BSCC
Los Angeles SHRF PDC-N (2025-2026 inspection cycle)
Read the report at Los Angeles SHRF PDC-N ↗
Initial Inspection Report
2025-2026 Biennial Inspection Cycle
Date of Exit Briefing: 9/19/2025 Inspection Type: Comprehensive
County: Los Angeles
Facility Name(s): Pitchess Detention Center - North
BSCC #(s): 1415 BSCC Type: II
Facility Representatives: Lieutenant Drake, Senior Hoban, Deputy Roberts
BSCC Field Representative: Traci Kessler
Corrective Action Plan Required? YES DATE CAP DUE TO BSCC: 12/5/2025
Current Items of Noncompliance
Title 24. Section Description
1231.2.8 Dormitories On the day of the onsite inspection, the facility was over
the rated capacity in the dormitories.
1231.2.9 Dayrooms (2) The dayrooms in the dormitories do not contain enough
Contains tables and seating to accommodate the seating and tables to accommodate the number of inmates
maximum number of inmates. in the unit.