BSCC
Sacramento SHRF RCCC (2025-2026 inspection cycle)
Read the report at Sacramento SHRF RCCC ↗
Initial Inspection Report
2025-2026 Biennial Inspection Cycle
Date of Exit Briefing: 5/11/2026 Inspection Type: Targeted
County: Sacramento
Facility Name(s): Rio Cosumnes Correctional Center
BSCC #(s): 4080 BSCC Type: II
Facility Representatives: Sgt. Le, Dep. Everett
BSCC Field Representative: Tim McWilliams
Corrective Action Plan Required? YES DATE CAP DUE TO BSCC: 6/11/2026
Current Items of Noncompliance
Title 24. Section Description
Over rated capacity in the following dorms: B (69
IP’s), J(73 IP’s), K (75 IP’s); RBF West 2 (10 IP’s), 4
(10 IP’s), 5 (9 IP’s), 6 (10 IP’s), 9 (9 IP’s), & 10 (10
IP’s); RBF East 11 (10 IP’s), 12 (10 IP’s), 13 (8 IP’s),
1231.2.8 Dormitories 14 (10 IP’s), 16 (7 IP’s), 20 (10 IP’s), 22 (8 IP’s), 23 (8
IP’s),24 (8 IP’s), 25 (9 IP’s), & 26 (10 IP’s); KBF
South 500 (48 IP’s); JKF North 100 (33 IP’s), 200 (65
IP’s), 300 (66 IP’s), 400 (44 IP’s), 500 (49 IP’s), 600
(64 IP’s).
Ratio of 1:10 IP’s:toilets exceeded in JKF North 200
1231.3.1 Toilets/urinals
(65 IP’s), 300 (66 IP’s), and 600 (64 IP’s)
Ratio of 1:20 IP’s:showers exceeded in KBF South
500 (2 showers/48 IP’s); JKF North 200 (2
1231.3.4 Showers showers/65 Ip’s), North 300 (2 showers/66 IP’s),
North 400 (2 showers/44 IP’s), North 500 (2
showers/49 IP’s), North 600 (2 showers/ 64 IP’s).
1231.2.22 Audio monitoring system No audio communication in the booking area