BSCC
San Diego George Bailey Detention Facility (2023-2024 inspection cycle)
Read the report at San Diego George Bailey Detention Facility ↗
Initial Inspection Report
2023-2024 Biennial Inspection Cycle
Date of Exit Briefing: 10/16/2020 Inspection Type: Targeted
County: San Diego
Facility Name(s): George Bailey Detention Facility
BSCC #(s): 4430 BSCC Type: II
Facility Representatives: Sgt. Eric Moore
BSCC Field Representative: Tim McWilliams
Corrective Action Plan Required? YES DATE CAP DUE TO BSCC: 11/17/2024
Current Items of Noncompliance
Title 24. Section Description
1:10 toilet/urinal ratio exceeded in the following
dormitories: House 1 Quads A101 (34), A103 (31),
1231.3.1 Toilets/urinals B104 (38), and B206 (36). House 2, Quads A101
(31), A103 (35), A201 (33), A203 (32), B104 (35),
B106 (37), B204 (38), and B206 (34).
1:10 washbasin ratio exceeded in the following
dormitories: House 1 Quads A101 (34), A103 (31),
1231.3.2 Wash basins B104 (38), and B206 (36). House 2, Quads A101
(31), A103 (35), A201 (33), A203 (32), B104 (35),
B106 (37), B204 (38), and B206 (34).