Technology:
The State Needs to Improve the
Leadership and Management of Its
Information Technology Efforts
June 2001
2000-118
rotiduA
etatS
ainrofilaC
S
T
I
D
U
A
E
T
A
T
S
F
O
U
A
E
R
U
B
The first five copies of each California State Auditor report are free.
Additional copies are $3 each, payable by check or money order.
You can obtain reports by contacting the Bureau of State Audits
at the following address:
California State Auditor
Bureau of State Audits
555 Capitol Mall, Suite 300
Sacramento, California 95814
(916) 445-0255 or TDD (916) 445-0255 x 216
OR
This report may also be available
on the World Wide Web
http://www.bsa.ca.gov/bsa/
Alternate format reports available upon request.
Permission is granted to reproduce reports.
C S A
ALIFORNIA TATE UDITOR
ELAINE M. HOWLE STEVEN M. HENDRICKSON
STATE AUDITOR CHIEF DEPUTY STATE AUDITOR
June27,2001 2000-118
TheGovernorofCalifornia
President pro Temporeof theSenate
SpeakeroftheAssembly
StateCapitol
Sacramento, California95814
Dear Governorand Legislative Leaders:
As requested by the Joint Legislative Audit Committee, the Bureau of State Audits
presents its audit report concerning the State’s management of information technology
(IT). This report concludes that the Department of Information Technology (DOIT),
which is responsible for overseeing the State’s efforts to plan, develop, and manage IT,
needs to provide stronger leadership and guidance to departments as they develop new IT
projects. Additionally, DOIT has not sufficiently addressed other responsibilities such as
completing a statewide inventory of projects to assist in the coordination of similar IT
efforts and to enhance its oversight, releasing technical standards that establish common
rules for IT projects, and consistently using state-mandated advisory councils to provide
input on its operations. Although DOIT is implementing a new strategic vision for
overseeing departments’ IT efforts, it is too early to assess the value that its new
processes will add.
While DOIT is responsible for overseeing the State’s IT efforts, departments are
primarily responsible for planning, developing, and ensuring the quality of their
respective IT projects. However, our review of four major projects revealed that
departments are not always using best practices to manage such projects. The four IT
projects we reviewed experienced varying degrees of cost overruns and delays; however,
two of these projects, managed by the Department of Transportation and the Department
ofHealth Services, had significant project management problems.
Respectfullysubmitted,
ELAINEM.HOWLE
StateAuditor
BUREAU OF STATE AUDITS
555 Capitol Mall, Suite 300, Sacramento, California 95814 Telephone: (916) 445-0255 Fax: (916) 327-0019
CONTENTS
Summary 1
Introduction 5
Chapter 1
DOIT Needs to Provide Stronger Leadership Over
Departments’ Information Technology Efforts 15
Recommendations 32
Chapter 2
Some State Departments Are Not
Managing Their Information Technology Efforts
According to Best Practices 35
Recommendations 50
Chapter 3
DOIT Has Not Fully Satisfied
Its Other Responsibilities 53
Recommendations 66
Appendix A
Evaluation of Departments’ Project Management of
Selected Information Technology Projects 69
Appendix B
Major Completed and In-Development Information
Technology Projects 73
Responses to the Audit
Department of Information Technology 97
California State Auditor’s Comments
on the Response From the
Department of Information Technology 141
Business, Transportation and Housing Agency 149
Department of Transportation
Health and Human Services Agency 155
Department of Health Services
Employment Development Department
State and Consumer Services Agency 167
Franchise Tax Board
SUMMARY
RESULTS IN BRIEF
T
he State has a significant investment in information
technology (IT)––more than an estimated $2 billion
Audit Highlights . . .
annually––and in the past has experienced several major
failures in planned IT systems. When it passed legislation that
Our review of the State’s
leadership and management resulted in the creation of the Department of Information Tech-
of its information technology nology (DOIT) in 1996, the Legislature envisioned that DOIT
(IT) projects revealed the
would provide the leadership, guidance, and oversight needed to
following:
protect the State’s investment in IT. Although DOIT is developing
(cid:1)
The Department of new processes to meet its responsibilities, it has not consistently
Information Technology delivered what it has been asked to do by the Legislature.
(DOIT), which is
responsible for overseeing
The State needs strong leadership from DOIT to ensure that
the State’s efforts to plan,
develop, and evaluate IT, departments develop IT systems effectively. However, DOIT is
needs to provide stronger not consistently ensuring that departments plan their IT efforts
leadership and guidance
carefully. Planning is crucial to the proper development of IT
to state departments.
projects. State law requires DOIT to develop a statewide IT plan
(cid:1)
Four major projects we to outline the vision and direction of the State’s IT efforts, but it
reviewed experienced has not updated its 1997 plan to address pressing issues and
varying degrees of cost
include current measurable objectives. Additionally, the state-
overruns and delays, but
wide plan does not include priorities to ensure that the most
two of these projects had
significant project important projects are considered first. Further, DOIT has not
management problems. sufficiently reviewed the strategic plans of departments’ IT
(cid:1) projects. DOIT could increase the level of leadership and guid-
DOIT has not sufficiently
met other responsibilities, ance it provides to increase the probability of success for the
such as completing a State’s IT efforts.
statewide inventory of
projects, releasing key
DOIT is also responsible for the review and approval of the
standards that establish
common rules for projects, proposed IT projects of departments. However, DOIT cannot
and using state-mandated demonstrate that it has consistently and sufficiently performed
advisory councils
project reviews or that it considers all risks before departments
consistently.
develop their projects. In its oversight role for IT projects in
The State has more than 2,500 development, DOIT requires departments to report their
completed and in-development
progress and, in some cases, requires departments to hire
IT projects of which 235 had
development costs greater than independent consultants to oversee projects. However, we
$1 million. As such, the State found that DOIT does not always use these reports effectively,
needs strong leadership to
nor does it request the detail necessary to properly monitor
ensure departments develop IT
projects. DOIT has launched several programs for overseeing
systems effectively.
projects from planning through evaluation that may address
these issues, but it has yet to fully implement these programs.
1
Although DOIT is responsible for overseeing departments’ IT
efforts, departments are primarily responsible for planning,
developing, and ensuring the quality of their IT projects. When
we reviewed four major IT projects recently under development,
we found that two projects had significant management
problems. The Department of Transportation (Caltrans)
undertook a major project to redesign how it collects and
accounts for toll bridge charges without first establishing a
supportable justification for the redesign. This particular project,
which started in 1993, is about five years behind schedule and is
expected to cost $28 million more than originally estimated.
The Department of Health Services (Health Services) has been
enhancing a management system for cases involving children
from low-income families and individuals who have certain
genetic diseases but is currently rethinking the technical
direction of this project. Meanwhile, the project is expected to
cost more than $10 million, almost double the original
estimated cost of $5.6 million. The projects at the Employment
Development Department and Franchise Tax Board were
generally better managed but still experienced some cost
overruns and delays.
In addition, DOIT has not consistently fulfilled other
responsibilities intended to improve the State’s management of
IT projects. One area of particular concern is that DOIT lacks a
mechanism to consistently assist departments in identifying
and coordinating similar IT projects. Further, state law requires
DOIT to maintain an inventory of IT projects, which could
improve coordination and oversight, but it has not
continuously maintained such an inventory and has only
recently surveyed departments to collect sufficient information.
In addition, DOIT has only recently prepared drafts of several
key standards that establish common rules for IT projects, and
has not yet begun to develop other standards. Also, DOIT has
not consistently used two state-mandated councils established
to provide advice on its activities. DOIT’s lack of progress on
these requirements and on some past initiatives could lessen its
credibility. Further, DOIT’s lack of an internal strategic plan to
prioritize its use of resources while facing the turnover of key
managers and other challenges has contributed to DOIT not
making more progress in meeting its statutory responsibilities.
2
RECOMMENDATIONS
To provide strategic guidance for IT activities, DOIT, in conjunc-
tion with others, should update the statewide plan to address
pressing IT concerns, priorities, and measurable objectives. DOIT
should then ensure that it reviews department-level strategic
plans for appropriateness and consistency with the State’s plan.
To improve its oversight of departments’ IT efforts, DOIT should
continue to reengineer its project review, approval, and
monitoring processes and promptly implement new processes
as needed. However, for any new oversight process, DOIT must
include sufficient documentation of project analyses to
demonstrate that it thoroughly evaluated the projects, require
departments to report relevant information about the progress
of their efforts, and ensure that DOIT staff receive and effectively
use project progress and oversight reports.
To organize and focus its efforts, DOIT should adopt an internal
strategic plan to identify key responsibilities and establish
priorities. Further, DOIT should establish a formal mechanism to
promote coordination of IT projects. To facilitate this
coordination, DOIT should complete the IT project inventory
based on its survey of departments, ensure that the reported
data is accurate, update the inventory as it receives new data,
and consider how departments and the Legislature can
effectively access this information. In addition, to improve
compatibility and help standardize IT processes, DOIT should
expedite its efforts to implement standards by focusing on
standards it determines are high priority. Further, it should work
with departments to ensure that all necessary standards have
been implemented. DOIT also should consistently use the two
advisory councils as intended by state law.
Finally, to help ensure that IT projects are implemented effec-
tively, departments need to better manage the development of
their IT projects. In particular, Caltrans and Health Services
should follow best practices when obtaining the services of
vendors and follow sound project management practices.
AGENCY COMMENTS
DOIT believes that our recommendations are consistent with the
new enterprise direction it is taking and has reported progress
on each of the recommendations. DOIT raises some concerns with
3
the audit work that established the basis for the recommenda-
tions; however, its response contains numerous incorrect or
misleading statements. Our comments on DOIT’s response
begin on page 141.
Caltrans, Health Services, and the Employment Development
Department all agree with the recommendations that we made
to them. In its response, the Franchise Tax Board provided us
n
additional information on its project that we reviewed.
4
INTRODUCTION
BACKGROUND
B
ecause of its vast power to process information quickly,
information technology (IT) continues to revolutionize
most aspects of industry and government. The computer’s
ability to quickly process large amounts of information is vital
to virtually all government services––whether providing
subsistence payments to the needy, collecting taxes, operating
the State’s water storage and delivery systems, or authorizing
health care for low-income families. The public’s apprehension
of the year 2000 computer “glitch” indicated how much we
depend on IT in our daily lives. Developing a major IT project
can be a complex, costly, and time-consuming task involving
the efforts of many state employees and often the assistance of
outside consultants. Because it demands a significant
commitment of resources—both financial and human—
developing an IT project is disruptive to an organization and
may shift its focus away from its primary mission. IT
development is not without risks. Many IT projects cost more
and take longer to complete than originally planned, while
others are abandoned when concerns mount regarding cost
overruns or system malfunctions. Estimates indicate that the
State spends more than $2 billion annually on IT projects.
Before 1996 the Office of Information Technology within the
Department of Finance had primary responsibility for the
review, approval, and oversight of IT projects in the State.
However, concerns over the Office of Information Technology’s
ineffectiveness led to a change in how the State monitored
departments’ IT efforts. In 1995, following legislative hearings
and various reports on failed IT projects, including a report
from the Bureau of State Audits in 1994, state law was enacted
to reengineer oversight of IT development. A major focus of the
state law, which became effective in January 1996, was
establishing the Department of Information Technology
(DOIT). Designed to improve the State’s ability to apply IT
effectively, DOIT was responsible for giving departments
guidance and leadership in all their IT efforts.
5
THE STATE HAS EXPERIENCED SEVERAL COSTLY
INFORMATION TECHNOLOGY FAILURES
Past IT failures have been very costly to the State. In 1997, after
spending more than $111 million, the State abandoned
development of a system to establish a statewide automated
network for tracking child support payments. A new statewide
system––known as the California Child Support Automation
System––is scheduled for full implementation in 2005. The delay
in implementing this system left the State subject to the penalty
of a reduced federal share of administrative expenditures for
child support. The penalties are expected to continue through
fiscal year 2004-05 and could reach $1 billion, according to
recent estimates by the Legislative Analyst’s Office. Although a
private vendor that the State hired was responsible for many of
the problems associated with the project’s failure, two
departments—the Department of Social Services and the Health
and Welfare Agency Data Center (now the Health and Human
Services Agency Data Center)—were also at fault, particularly
because they mismanaged the project and did not take sufficient
action to address quality assurance warnings. Other major
project failures, including those at the Department of Motor
Vehicles and the Department of Corrections, have cost the State
and taxpayers about $400 million. Moreover, the costs related to
these failures are even greater considering the inefficiencies and
service delivery problems that departments continue to
experience because they could not implement the projects
intended to remedy those problems. A major
reason for DOIT’s existence is the Legislature’s
Authority of the
intention that such failures would not be repeated.
State’s Chief Information Officer
• Develop policies and requirements for
carrying out DOIT’s responsibilities.
DOIT HAS BROAD AUTHORITY TO
(cid:127) Review proposed department IT projects for
compliance with statewide strategies, policies, PERFORM ITS RESPONSIBILITIES
and standards, including project
management methods. DOIT’s charter is to provide leadership, guidance,
(cid:127) Monitor department IT projects and and oversight for the IT projects initiated by
recommend remedial measures to ensure
state departments. DOIT’s role is crucial,
continued compliance with statewide
strategies, policies, and standards, including especially when it oversees how departments
project management methods. develop their projects, because it must identify
(cid:127) Suspend, reinstate, or terminate IT projects. and correct problems before they become costly
disasters. The director of DOIT, who is also the
State’s chief information officer (state CIO), is
6
given broad authority to carry out DOIT’s responsibilities and
reports to the governor. The governor appoints the state CIO
with the concurrence of the senate. The current state CIO was
appointed in February 1999.
In addition to attempting to fulfill its responsibilities mandated
by law, DOIT put significant energy into leading the State’s year
2000 efforts. These efforts were needed to resolve a problem
caused by an old design convention calling for computer
systems to use only the last two digits of a year. This convention
could have produced invalid results or system failure on
January 1, 2000, because systems would read the “00” as 1900
rather than 2000. In late 1997 the Legislature designated DOIT
to oversee, coordinate, and report on the departments’ progress
in fixing their IT systems. Because of the potential impact to the
State, departments were required to focus on the year 2000 effort
and could not undertake new IT projects unless mandated by
law. Thus departments had to defer development of many IT
projects until they addressed how to resolve the year 2000
problem in their completed projects.
In fiscal year 1996-97, its first full year of operation, DOIT was
budgeted to have 20 positions. By fiscal year 1999-2000, DOIT
had 61 positions, of which 17 have limited terms. In 2000 DOIT
analyzed its responsibilities and received approval to increase
authorized staffing to 80 positions for fiscal year 2000-01.
Because of the complex nature of its work, 47 of the budgeted
positions are at the manager level or above. According to DOIT
and a consultant it hired, this level of staffing is sufficient for it
to perform its statutory responsibilities. As of January 2001
DOIT had filled only 62 of the 80 positions.
DOIT was created with a sunset provision, which was initially
July 1, 2000, but was extended to July 1, 2002. Sunset provisions
are uncommon in California but are used by some states to
periodically evaluate the need for various state departments to
exist based on their effectiveness. Unless the current law is
amended, DOIT will cease operations. DOIT has a budget of
$11.8 million for fiscal year 2000-01.
7
THE STATE’S INFORMATION TECHNOLOGY
GOVERNANCE STRUCTURE IS COMPLEX
The State’s ability to manage its IT efforts is complicated by the
interrelationships of many state agencies, departments, and
other parties.
(cid:127) The governor establishes a vision for how the State will use IT
and provides direction to departments on how to implement
this vision.
(cid:127) The Legislature authorizes project development by appropri-
ating funds.
(cid:127) The state CIO monitors most state departments’ implementa-
tion of the governor’s vision and oversees DOIT. State law
makes the state CIO the leader for the State’s IT efforts.
(cid:127) Agency secretaries oversee the planning, development, and
operation of IT systems within their agencies.
(cid:127) Departments plan, develop, and operate IT projects to carry
out their responsibilities.
(cid:127) Department CIOs are primarily responsible for coordinating
their departments’ IT activities.
(cid:127) Department project managers manage the development of
their departments’ IT projects.
(cid:127) Department of Finance approves funding for IT projects
primarily through its specialized IT review unit called the
Technology Investment Review Unit. The Department of
Finance has authority over departments’ budget activities.
(cid:127) Department of General Services (General Services) adminis-
ters the procurement of IT goods and services from private
vendors, primarily through its procurement division. General
Services has authority over departments’ procurement activities.
(cid:127) Data centers provide data processing services to departments
and, in some instances, help evaluate vendors’ bids prior to
vendor selection and contract award. The data centers include
the Stephen P. Teale Data Center, the Health and Human
Services Agency Data Center, and the Hawkins Data Center in
the Department of Justice.
8
(cid:127) Advisory councils are intended to assist the state CIO by
providing advice and input on IT strategy and policies.
(cid:127) Director of eGovernment advises the governor on policy and
coordinates with DOIT and other state departments on the
State’s electronic government (eGovernment) initiative, which
is designed to promote the provision of services and informa-
tion by state government to the public through the Internet.
(cid:127) Private vendors and consultants provide software develop-
ment services, computer hardware, and other specialized
technical services to state departments.
Some entities are exempt from the purview of DOIT. These
include the California State University, the University of Califor-
nia system, the Public Employees’ Retirement System, and the
California State Lottery. These entities initiate, approve, and
procure their own IT projects and are ultimately responsible for
their development.
INFORMATION TECHNOLOGY DEVELOPMENT
REQUIRES SEVERAL STEPS
The IT development process involves a number of steps, from
planning through evaluation of the project, as shown in
Figure 1. Departments are responsible for developing IT projects
with the approval and oversight of the control agencies—DOIT,
the Department of Finance, and General Services. To obtain
approval for an IT project, a department must prepare a
feasibility study report. This report provides the business reasons
to justify the investment of state resources in the project, the
reasons for undertaking the project, the means of ensuring the
success of the project, and a comprehensive analysis of its costs
and benefits. Often a department must work with a private vendor
to develop an IT project. Unless the department is delegated the
authority to make its own purchases, General Services helps the
department procure the appropriate vendor. However, the
department is responsible for the proper management of all
development efforts. Once development is completed, the
department must evaluate whether it achieved the anticipated
benefits of the IT project.
9
FIGURE 1
The State’s Information Technology Development Process
PLANNING APPROVAL PROCUREMENT IMPLEMENTATION EVALUATION
DOIT is to develop a DOIT is to approve Unless the department is The department and The department
statewide strategic plan, technical aspects of the delegated the authority the vendor, if used, prepares a
while each department project and determine to make its own develop and implement postimplementation
is to develop IT consistency with the purchases, General the IT project. DOIT evaluation report to
strategies. When statewide plan, policies, Services assists the and, in certain assess how well the
proposing an IT project, and standards. The department in planning instances, independent completed project met
a department prepares a Department of Finance the acquisition strategy consultants, provide its goals. DOIT is to
feasibility study report approves the business and in preparing a bid project oversight. review and approve this
for approval from DOIT case and determines if solicitation document, report.
and the Department of the project is a sound usually a request for
Finance. investment of state proposal. General
funds. Services issues this
document, receives
vendors' proposals,
conducts discussions with
vendors, negotiates
contract language
changes, coordinates
with the department to
evaluate proposals, and
determines the winning
vendor. In some
instances, the
preparation of the
request for proposal may
come before a
department develops a
feasibility study report.
THE GOVERNOR’S ELECTRONIC GOVERNMENT
INITIATIVE
In September 2000 the governor issued an executive order to
direct the State’s eGovernment initiative, which is intended to
encourage departments to offer services and information to the
public through the Internet. The premise is that eGovernment
will act as a catalyst for departments to design better ways to
provide government services. The executive order also
established a director of eGovernment to advise the governor
and coordinate these activities with DOIT and departments.
A successful eGovernment program depends on a statewide
infrastructure that is compatible and allows the sharing of
information among systems. Thus the eGovernment initiative
will be a major focus of the State’s future IT activities.
10
SCOPE AND METHODOLOGY
The Joint Legislative Audit Committee requested that the Bureau
of State Audits examine the State’s processes for approving,
funding, planning, and monitoring IT projects to determine
whether they are adequate to protect the State’s multibillion-
dollar investment in these efforts. We were asked to review a
number of specific areas, including strategic planning for IT
activities, the project approval process and coordination of
similar IT activities, the management of a sample of projects
under development, the procurement of private vendors to assist
in development of IT projects, and the sufficiency of DOIT’s
resources to perform its duties. In addition, we were asked to
compile an inventory of the State’s major IT projects.
To gain an understanding of the requirements for planning,
designing, procuring, and implementing IT projects, we
reviewed relevant state laws and policies. We learned that many of
the areas we were asked to review were under the direct
responsibility of DOIT. For example, state law makes DOIT
responsible for developing or ensuring the development of the
statewide vision, strategies, plans, policies, requirements,
standards, and infrastructure for IT and ensuring that
departments’ proposed IT projects are aligned with appropriate
strategies, policies, and standards. Thus we focused our work on
DOIT and to a lesser extent on General Services, which is
responsible for conducting procurements, and the Department
of Finance, which is responsible for approving the funding for
IT projects. In addition, we evaluated the management of one IT
project each at the Employment Development Department, the
Franchise Tax Board, the Department of Health Services, and the
Department of Transportation.
To further understand the State’s IT environment, we inter-
viewed 17 CIOs: 12 from departments that report to DOIT and
5 from state organizations that are exempt from DOIT’s review.
We asked all 17 CIOs a series of questions to learn their concerns
and perspectives about the State’s IT development process. We
also asked the 12 department CIOs about the role of DOIT and
the other control agencies involved in IT development. Further,
we used the results of interviews of CIOs to help us decide where
to focus our audit efforts. We also considered IT practices used
by other states to help us understand the State’s IT practices.
11
To evaluate the planning process for IT projects, we reviewed the
State’s and selected departments’ strategic IT plans. Further, we
also selected a sample of DOIT-approved projects to assess the
adequacy of the project approval process. For some projects,
departments can request an exemption from DOIT’s review.
Because DOIT reported approving only eight requests during
2000, of which at least four appear to be for hardware or
commercial software, we did not review how DOIT granted
exemptions. In addition, we evaluated how DOIT assesses the
departments’ risk planning for their projects. To learn about
DOIT’s operations, we interviewed its management and staff
and examined its procedures for approving IT projects.
To evaluate the effectiveness of DOIT’s oversight of IT projects
under development, we determined if DOIT received project
status reports and independent consultant reports on these
projects and reviewed its analysis of these documents. We also
reviewed whether DOIT required departments to evaluate the
benefits received from completed IT projects.
To assess whether departments have properly planned,
approved, procured, managed, and evaluated their IT projects,
we reviewed four IT projects recently under development. We
reviewed a 1998 report from the Legislative Analyst’s Office on
IT best practices, interviewed department staff and the private
vendors they hired, and analyzed various project documents,
such as planning documents, to determine if departments were
following best practices during project development. In addition
to the Legislative Analyst’s Office’s best practices, we considered
those included in state requirements, the Project Management
Body of Knowledge (PMBOK), and the Control Objectives for
Information and related Technology (COBIT). We then rated how
well the departments managed these four projects in accordance
with the best practices. We discuss the results of this review in
Chapter 2 and present the detailed ratings in Appendix A.
To determine if DOIT was fulfilling its other responsibilities, we
interviewed DOIT management and staff, attended meetings of
department CIOs, and reviewed reports on the State’s IT devel-
opment process. In addition, we reviewed DOIT’s prior annual
reports to the Legislature and followed up to determine if DOIT
had completed objectives that it had established. Further, we
assessed whether DOIT had coordinated similar IT activities as
well as performed other statutory responsibilities, including
obtaining input from IT advisory councils.
12
Finally, to create an inventory of the major statewide IT projects
in the planning or implementation stages, we compiled
information from DOIT’s project survey of 111 state agencies,
departments, boards, and commissions. For purposes of this
report, we refer to all these entities as departments. We used the
information as the basis for our inventory of IT projects but found
that many departments did not report complete information to
DOIT. We contacted departments to ask them to provide missing
information and to confirm that we had properly presented their
IT projects. In addition, we verified the accuracy of selected
information at 5 departments for a sample of projects. We
n
present our inventory of IT projects in Appendix B.
13
Blank page inserted for reproduction purposes only.
14
CHAPTER 1
DOIT Needs to Provide Stronger
Leadership Over Departments’
Information Technology Efforts
CHAPTER SUMMARY
A
lthough the Department of Information Technology
(DOIT) is responsible for overseeing the State’s efforts to
plan, develop, and evaluate information technology (IT)
projects, its leadership and guidance should be increased. DOIT
has not updated the statewide IT plan to address current issues
or specify current measurable objectives. Such a strategic plan—
which DOIT is charged with developing—is critical to focus the
State’s IT efforts. DOIT also does not sufficiently review and
approve departments’ IT strategic plans. As a result, DOIT is
missing opportunities to ensure that departments’ IT planning
efforts are appropriate and consistent with statewide IT strate-
gies. Moreover, DOIT has not always given departments clear
guidance in developing and managing IT projects.
In addition to not fulfilling its IT planning responsibilities,
DOIT does not have a well-documented project review and
approval process. DOIT has not ensured that departments assess
the risks involved with IT projects before they start develop-
ment. As a result, DOIT could fail to detect poorly conceived or
planned projects.
Once it approves IT projects for development, DOIT is
responsible for overseeing departments in properly managing
the projects. However, DOIT is not always using departments’
progress reports to effectively oversee IT efforts. In addition,
some departments make it difficult for DOIT to properly oversee
their efforts because they do not report problems when they
should. Finally, DOIT’s new strategic vision for planning,
approval, and oversight may address some of these weaknesses.
To implement this vision, DOIT is reengineering its existing
processes and began a pilot of its revised feasibility study report
process in May 2001. Because DOIT has yet to finalize and
implement this vision, it is too early to determine the value that
it will add.
15
DOIT SHOULD IMPROVE ITS PLANNING
RESPONSIBILITIES AND PROVIDE CLEAR GUIDANCE
Although a statewide IT plan is required by law, DOIT has not
recently updated the plan to include pressing issues or current
measurable objectives. Good strategic planning would set the
tone for departments’ IT efforts and enable the State to better
coordinate the divergent efforts of its departments.
DOIT issued the existing statewide IT plan in 1997, establishing
strategies, objectives, and action items. However, DOIT should
revise the plan to guide the State in dealing with critical IT issues
and changes in technology. For example, over the next couple of
years, various departments that provide health care services or
use the related data will need to change how their IT systems
collect, process, and report individuals’ health information to
comply with administrative requirements stemming from a
federal law passed in 1996. Further, the governor’s electronic
government (eGovernment) initiative will require all
departments to consider ways to deliver services to citizens over
the Internet. These issues and changes in technology have
significantly changed how departments should plan their IT
efforts. Although DOIT has made presentations to departments
regarding these issues, it has not updated the statewide IT plan
to clarify how these and other potentially important matters fit
into the State’s overall strategy.
Few department chief information officers (CIOs) with whom
we met reported using the statewide plan to guide the creation
of their departments’ IT plans. In fact, many CIOs indicated
they had not recently read or were not familiar with the
statewide IT plan, and some stated that the plan did not include
enough details on standards to be relevant to their departments’
current project development efforts. In addition, because
proposed IT projects must conform to statewide strategies,
departments need a current statewide IT plan to guide their
development decisions. When DOIT updates the statewide IT
DOIT has not updated plan, departments will be able to ensure that their IT strategies
the statewide IT plan are properly aligned with the State’s IT vision.
since 1997, and few
departments we met with Additionally, DOIT has not established current measurable
reported using it to guide objectives that would allow the State to use the statewide IT plan
their IT efforts. to gauge its progress in key areas. The 1997 statewide IT plan
identifies 36 action items to implement the IT strategy; however,
only 6 items still add value because they are ongoing tasks or
tasks that are to be carried out by this year or later. Because all
16
other action items are outdated, the State is left with few
relevant items by which to measure its progress. For example,
one action item recognizes the need for DOIT to encourage one
of the State’s data centers to move to a more suitable facility.
Because the specified data center moved into a new facility
during 2000, this action item is no longer current. In the
absence of an up-to-date statewide IT plan, DOIT has not
provided measurable objectives in the annual reports that state
law requires it to submit to the Legislature. These measurable
objectives should define the results DOIT will achieve and when
it will achieve them. As a result, the State lacks current, effective
measures for its progress on strategic IT issues.
Unlike the plans of other organizations, DOIT’s statewide IT
plan does not include priorities for large projects that ensure
that the most important projects are considered first. We identi-
fied several organizations that use their strategic planning
process to identify priority projects for their organizations. For
example, the California State University, one of the entities not
When updated, the subject to DOIT’s purview, surveyed its campuses to determine
statewide IT plan should their IT needs and then prioritized IT funding on 11 key
prioritize IT projects that projects. Transportation projects in California also go through
are most important or an extensive prioritization process at local, regional, and state
needed. levels to identify which projects will receive available funding.
In addition, the state of New York identified 75 priority services
and transactions in its plan to provide services to its citizens
over the Internet. DOIT’s statewide IT plan also does not identify
departments that lack sufficient funds to replace aging systems
or systems that vendors no longer support. We recognize that
establishing priorities for the State’s IT efforts may be a consider-
able undertaking. Additionally, we recognize that DOIT will
need to work in collaboration with departments, the governor,
the Legislature, and the Department of Finance to establish
priorities rather than establish them unilaterally. Nevertheless,
we believe that including priorities in the statewide IT plan
would be beneficial and that DOIT can play a key role in facili-
tating this process. Without a plan that communicates statewide
priorities for new systems, the State may not focus on strategic
IT efforts that are most important or needed.
DOIT acknowledges that the statewide IT plan is out-of-date,
stating that instead of updating the plan, it focused on ensuring
that the State was properly prepared through the year 2000
effort, reorganizing its operations, and addressing other issues
that it considered important, such as eGovernment. Although
DOIT initially proposed to revisit the plan once it completed its
17
internal strategic plan, it now intends to work on both plans
concurrently. To begin the process of updating the plan, DOIT
organized a work group of department CIOs that started weekly
meetings in March 2001. DOIT expects to issue the statewide IT
plan sometime during fiscal year 2001-02. Until DOIT estab-
lishes an effective statewide IT plan, the State continues to
operate without a clear direction for its IT efforts.
DOIT Should Ensure That Departments Conduct Appropriate
IT Strategic Planning
DOIT has not sufficiently reviewed and approved the strategic
plans for departments’ IT projects although it stated that it
recently began to do so. Consequently, it has not consistently
guided department planning efforts at the earliest stages to
ensure the development of viable projects. DOIT noted recently
that the review of departments’ IT plans in the past did not
merit assignment of its resources because of higher priorities,
including the year 2000 effort, and thus these reviews occurred
only sporadically. However, since 1996 DOIT has been
responsible for approving departments’ IT strategies. Despite the
absence of DOIT involvement, departments are continuing to
prepare their strategies and implement projects accordingly. Of
eight departments we reviewed, all had prepared plans between
1997 and 2000, but DOIT had reviewed none. Without DOIT’s
review and approval, departments’ IT strategic plans may have
weaknesses, be inconsistent with the statewide IT plan, or in the
absence of an updated statewide plan, reflect philosophies that
DOIT believes are inappropriate.
Insufficient IT plans among state departments are not new
occurrences. The former Office of Information Technology (OIT)
DOIT does not review under the Department of Finance found numerous weaknesses
departments’ IT plans when it analyzed departments’ IT plans before 1996. For example,
despite past problems OIT found that the IT plan prepared by the Employment
with such plans. Development Department in June 1994 provided no basis for
prioritizing projects, lacked a coordinated approach, and failed to
fulfill 9 of 19 criteria on the review checklist that OIT used to assess
the adequacy of departments’ IT strategic plans.
To help with what it believed was an increasing workload of IT
strategic plan reviews, DOIT requested and received additional
staff but subsequently assigned them to other tasks. For the fiscal
year 1998-99 budget, DOIT requested and received two data
processing managers and approximately $437,000 to contract
for outside assistance in reviewing departments’ IT plans.
18
However, DOIT reassigned the staff to work on the year 2000
effort, which was a higher priority at the time. DOIT stated that
it began reviewing departments’ IT plans on a case-by-case basis
in May 2001, and it plans to redefine this process sometime in
early 2002.
Departments Receive Unclear Guidance for
Sources of DOIT Policy for Preparing Managing IT Projects
Feasibility Study Reports
Departments receive unclear guidance because
Management Memos DOIT does not always consolidate, update, or
1. 98-02 Fundamental Decision Criteria for
clarify its policies. State law charges DOIT with
Approval of IT Projects
updating its policies to reflect the State’s
2. 98-12 Acquisition and Management of
changing IT needs and publishing them in the
Major IT Projects
State Administrative Manual or in Management
State Administrative Manual
3. Section 4819.35 Feasibility Study Report Memos. Departments need clear and up-to-date
policies to guide them when researching the
4. Sections 4920-4930.1 Feasibility
Study Policy feasibility of IT projects. Although DOIT has
Statewide Information Management Manual published policies, it has not consolidated them
5. Volume I Section 5.0 Feasibility Study to improve departments’ ability to follow them
Report Policy
when drafting feasibility study reports.
6. Volume II Section 5.0 Feasibility Study
Currently, departments must search at least six
Report Guidelines
sources of policy to understand DOIT’s
guidance and directives to submit their
feasibility study reports.
This lack of policy consolidation also extends to other com-
monly used IT approval documents. For example, to prepare IT
procurement documents, which allow departments to seek
vendors to assist in their development efforts, departments must
consult seven sources. These multiple sources of policy can
create confusion and misunderstanding. DOIT contends that,
because it works with CIOs to develop policies and processes,
this practice reduces misunderstanding and confusion. Never-
theless, departments could more readily understand DOIT’s
guidance on elements of the IT development process if they
were defined in fewer policy sources.
We also found that DOIT still publishes some rescinded policies
that conflict with current policies. Departments’ IT efforts are
guided by DOIT policies, which must be clear and not in contra-
diction with each other so that departments can understand them.
However, DOIT has not removed or marked as rescinded several
sections of published policy that have been superseded by policies
it has subsequently released. For example, DOIT published sections
of Volumes I and II of the Statewide Information Management
19
Manual in July 1998 to replace seven sections of the State Ad-
ministrative Manual but did not remove those seven sections
from publication. Moreover, the State Administrative Manual
does not always reflect current policy and IT trends because the
last update to any IT section was in 1997, and many parts were
Because the last update last updated before 1994. Thus departments could be following
to the IT section of the guidance contained in DOIT policies that have been rescinded,
State Administrative conflict with existing policies, or are no longer relevant.
Manual was in 1997, it
does not always reflect Additionally, although DOIT provides guidance to departments on
current policy and IT the alternative procurement process through a management
trends. memorandum and discussions with departments, it has not
updated contradictory guidance contained in the State
Administrative Manual. The alternative procurement process is
one in which a department describes its business need and
vendors propose their designs of the IT project to meet this need
rather than the traditional process of procuring a vendor after
approval of the feasibility study report. In 1998 DOIT published a
memorandum requiring that departments use the alternative
procurement process for all IT projects that cost more than
$5 million and are critical to department operations. However, in
the section of the State Administrative Manual for which DOIT is
responsible, the alternative procurement process is described as a
pilot, and it is left up to departments to request authorization to
use it if the departments believe it might be beneficial.
Additionally, although DOIT’s memorandum apparently man-
dates the use of the alternative procurement process for large,
critical projects, DOIT and the Department of General Services
(General Services) have yet to evaluate and formalize the pilot
process as called for in the State Administrative Manual. This
administrative policy states that within two years after approval
of the first pilot procurement, the directors of DOIT and
General Services would assess the process to determine its appro-
priateness and suitability for continued use. The first alternative
procurement, according to General Services, was awarded in
1994. Thus the process should have been evaluated by now.
DOIT assumes that the previous management’s 1998 memo-
randum requiring that departments use the process was part of
the assessment needed. General Services told us that assessing
the alternative procurement process is overdue. An evaluation of
the alternative procurement process would be valuable because
it could be used to provide information to departments on
how the process could be most effectively used. DOIT stated
20
that it is currently collaborating with General Services and the
Department of Finance to further refine the process, including
changes to the State Administrative Manual.
Based on our interviews with staff from DOIT, the Technology
Investment Review Unit within the Department of Finance, and
General Services, the alternative procurement process is not only
beneficial for the State but should be used for large IT projects
that are critical to departments’ operations. Most of the CIOs we
interviewed said they have used the alternative procurement
process. Although DOIT and General Services are both
responsible for assessing the value of the pilot project, DOIT
should take the lead because state law makes it responsible for
procurement policy. However, DOIT will need the assistance of
General Services, which administers procurements for state
departments, to make this evaluation meaningful.
DOIT SHOULD DOCUMENT ITS BASIS FOR APPROVING
PROJECTS AND ENSURE THAT DEPARTMENTS
PROPERLY ASSESS RISKS
Weaknesses in DOIT’s review of feasibility and risk for proposed
IT projects could result in its failing to detect poorly conceived
efforts. One weakness is that DOIT often does not document the
basis for its decisions to approve IT projects. In
addition, despite the fact that IT projects are
Objectives of Evaluating IT Projects
inherently risky, DOIT does not ensure that
Against DOIT’s Fundamental
departments appropriately assess their risks.
Decision Criteria
(cid:127)Supports department’s mission as defined in
its business plan. DOIT’s Project Review and Approval Process Is
(cid:127)Is compatible with state, agency, and Not Well Documented
department IT plans.
DOIT does not adequately document its process
(cid:127)Supports business functions that have been
optimized and redesigned. for reviewing proposed IT projects. Thus it cannot
demonstrate it has consistently and sufficiently
(cid:127)Demonstrates a clear return on the
State’s investment. analyzed whether departments are properly
(cid:127)Secures the commitment and sponsorship of conceiving and planning IT projects. When
executive management. establishing DOIT, the Legislature made it
(cid:127)Has a project manager and team with responsible for ensuring that proposed IT projects
appropriate training and experience.
comply with appropriate statewide strategies,
(cid:127)Is structured with clear project management policies, standards, and project management
and control methodologies for tracking
practices. DOIT issued a policy defining
project progress.
fundamental decision criteria to help ensure that
(cid:127)Employs best practices for procurement.
departments developed IT projects properly. In
21
addition, DOIT developed a checklist incorporating various
criteria, including the fundamental decision criteria, to ensure
that projects meet all applicable criteria for support and
approval. In early 2000 DOIT also developed a project
summary intended to support its analyses of projects.
However, DOIT could not provide us with sufficient evidence
that it thoroughly analyzed any of the 10 projects we reviewed.
For 10 proposed The development costs for each project ranged from about
projects reviewed, with $280,000 to more than $11 million and totaled roughly
development costs $35 million. Although DOIT provided its approval letters,
totaling $35 million, which included the conditions imposed on the projects, its
DOIT could not provide documentation of its analyses of these projects was insufficient
sufficient evidence that it for several reasons. For 5 of the 10 projects we found no
thoroughly analyzed evidence—such as checklists, project summaries, or other
them. documents—of DOIT’s analyses. For the remaining 5 projects
we found some analysis but not enough to demonstrate why
DOIT approved the projects.
In the five projects showing some analysis occurred, DOIT gave
us the questions it asked departments about their projects.
Instead of providing grounds for project approvals, however,
the questions and responses only supplied additional
information or clarity not found in the departments’ feasibility
study reports. In addition, some of these five projects included
other analysis documents, such as a checklist or project
summary. However, none of this analysis was sufficient to
demonstrate why DOIT approved the projects. For example, one
of the five projects contained a project summary, but it was very
brief and the analyst noted when recommending approval for
the project that DOIT had already issued a letter supporting the
project. Thus DOIT’s documentation of its analyses of these five
projects was insufficient.
DOIT indicated that it approved many of these projects while it
was focusing on the year 2000 effort and that it did not have
enough resources to consistently perform thorough project
reviews and oversight or to completely document the work
performed. However, given the State’s investment in these
projects, it is crucial that DOIT ensures it documents that it has
thoroughly analyzed proposed projects.
In contrast, when we reviewed the process that the Department
of Finance’s Technology Investment Review Unit (unit) uses to
review and approve the funding of proposed IT projects, we
22
found it to be consistent and well documented. The unit focuses
its evaluation on the investment value and funding of a project,
Lacking evidence of while DOIT’s review focuses on the proposed technology. The
approval decisions, DOIT unit documents its review in a project analysis using guidelines
would be hard-pressed to in its employee review handbook, and the analysis clearly
explain why it approved indicates the reasons the unit recommends approval of a
a project if that project project’s funding. Therefore, we found appropriate evidence to
should fail or experience support the unit’s approval decision on each of the same 10 pro-
significant difficulties. posed IT projects we reviewed.
Without thorough documentation of its approval decisions,
DOIT would be hard-pressed to explain why it approved a
project costing the State millions of dollars if the project were to
fail or experience significant difficulties. In lieu of a complete
record of its approval, DOIT must rely on the memories of its
staff, but high staff turnover makes it even more difficult to
reconstruct the circumstances of an approval. Furthermore, the
current level of documentation could prevent DOIT from learn-
ing from past mistakes and improving its project approval
process. Although a proposed revision to the approval process
for feasibility study reports might address some weaknesses,
DOIT has not yet finalized and implemented the revision. DOIT
began a pilot of the new process in May 2001, and the pilot is
tentatively scheduled to last two to three months. DOIT expects
to use this new process for all proposed IT projects beginning in
early 2002. Therefore, we could not evaluate whether this new
process will fully address these weaknesses.
DOIT Is Not Adequately Ensuring That Departments Assess
Project Risk
To assess the risks associated with implementing IT projects,
DOIT has a risk assessment model but applies it in a way that
weakens its usefulness. IT projects are inherently risky because
many unanticipated events occur during their development,
and often outcomes are unknown. Thus a key step in planning
is to identify these risks and develop ways to mitigate or lessen
their potential impact. DOIT developed a risk assessment model
as an automated tool to help departments identify project risk.
This model categorizes project risks into five distinct areas.
DOIT requires departments to use the risk assessment model and
reviews the risk assessments as part of the project approval
process. DOIT states that its staff use risk assessments, as well as
all other information provided by departments, to recommend
23
whether to approve projects and suggest actions
that DOIT and the departments might take to
Five Areas of Project Risk That DOIT’s
minimize project risks and ensure project success.
Risk Assessment Model Evaluates
(cid:127) Strategic risk: the degree to which the
However, in our review of the 10 proposed IT
proposed project is in alignment with
business strategies. projects we discussed in the previous section, we
found little evidence that DOIT evaluates depart-
(cid:127) Financial risk: the probability that the
organization will be able to secure funding ments’ risk assessments. DOIT indicated that its
for the entire project life cycle from
analysis should appear in various documents,
sponsoring agencies.
such as the project summaries, the checklist that
(cid:127) Project management risk: the impact on all
includes the fundamental decision criteria, and
areas of project management necessary to
complete the project, including a realistic questions to departments. However, as discussed
time frame, sufficient resources, necessary
previously, DOIT did not sufficiently document
skill levels, and a sound project management
approach. its analysis of the 10 IT projects we reviewed.
DOIT has stated that documenting processes was
(cid:127) Technology risk: the degree to which the
project must rely on new, untested, or not its top priority while it was working on the
outdated technologies, including hardware,
year 2000 effort because of conflicting priorities
software, and networks.
and limited resources. Nevertheless, without a
(cid:127) Change management and operational risk:
thorough review of IT project risk, DOIT cannot
the amount of change needed within the
organization as well as the effort required for ensure that departments have identified and
continued operations at project completion.
mitigated all project risks.
In addition, although DOIT received risk
assessment summary reports for 9 of the
10 projects we reviewed, it received sufficient information to
evaluate the risk-planning efforts of only 3 projects. For the
remaining 6 projects that submitted reports, the departments
did not answer all questions required, and 3 included only
summaries of the final risk scores and omitted responses to
questions about risk. Without sufficient responses to these
questions, DOIT cannot identify specific risks that may need
further questioning and clarification. For example, 1 of the
8 questions used to assess project management risk deals with
the level of experience of the project management team, a
crucial factor in evaluating project risk. Additionally, DOIT does
not require departments to answer the same questions when
submitting their risk assessments—the number to be answered
ranged from 5 to 38. Because some departments do not
consistently answer questions about risk, DOIT may not be able
to use the risk assessment to ensure that departments consider
all risks before developing their projects.
Further, DOIT allows departments to apply the risk assessment
model late in the approval process of large, critical IT projects
that are required to use the alternative procurement process.
24
Therefore, IT project risks are not formally assessed before
departments have started undertaking significant planning
efforts. In these instances departments begin planning their IT
projects and conduct procurement with potential vendors,
including evaluating proposals, selecting technical solutions,
and negotiating contracts, before performing formal risk
Under DOIT guidelines, assessment. For example, more than two years of planning can
more than two years of pass on some projects before departments must conduct a risk
planning can pass before assessment, per DOIT’s guidelines.
departments assess risk
on large, critical projects. DOIT states that until departments complete the alternative
procurement process, they do not know enough details about
the projects to evaluate most of the factors that the risk assess-
ment model measures. We disagree. Of the 38 questions that
DOIT may require departments to answer, we identified at least
18 that departments could address when starting an alternative
procurement to give some indication of risk. For example,
departments could answer questions about whether projects are
aligned with their business plans, the experience of the project
management team, and expected development costs. By not
considering risks early in the alternative procurement process,
departments might overlook problems that could be corrected
before they are too expensive and time-consuming to remedy. As
part of its revised feasibility study report process, DOIT indicated
that it also plans to redesign its risk assessment model.
DOIT COULD IMPROVE ITS OVERSIGHT OF
DEPARTMENTS’ INFORMATION TECHNOLOGY EFFORTS
In several of the State’s major IT project failures over the past
decade––for example, the statewide automated network for
tracking child support payments and a failure at the Department
of Motor Vehicles––poor project management by departments
was a common factor. One of DOIT’s key responsibilities is to
monitor departments’ implementation efforts and thus help
avoid such failures. To carry out this responsibility, DOIT is to
oversee the development and management of IT projects to
ensure that departments comply with policies and standards.
However, DOIT has not always fulfilled its oversight
responsibility and, as a result, has not positioned itself to
prevent potentially unnecessary and costly project delays.
25
DOIT Is Not Always Using Departments’ Project Reports
as Oversight Tools
DOIT does not always use the periodic progress reports or the
reports submitted by independent validation and verification
(IV&V) consultants to properly oversee departments’ IT projects.
When DOIT approves a project, it typically requires the depart-
ment to submit periodic progress reports to summarize the
status of the project. Additionally, departments sometimes use
an IV&V consultant to evaluate the primary vendor’s perfor-
mance by reviewing planning documents, assessing the quality
of the project’s system design, going over the computer code
being written, and a variety of other tasks. The IV&V consultant
makes recommendations to the department on how to obtain a
better quality product from the primary vendor and thus can
give DOIT insights on potential problems. Because DOIT does
DOIT may be late in not always use periodic progress reports or IV&V consultant
detecting problem IT reports effectively, it may be late in detecting problems and is
projects because it does more reactive than proactive in dealing with troubled projects.
not always use
departments’ reports We reviewed nine projects that recently submitted special
effectively. project reports, which are generally required when a project
exceeds or expects to exceed the original cost or timeline by
more than 10 percent. Based on our review of the periodic
progress and IV&V reports for these nine projects, dating from
October 1999 to September 2000, and our discussion with DOIT
analysts, we found limited evidence that DOIT used the reports
as tools for overseeing these projects. Moreover, it is question-
able whether DOIT uses the IV&V reports for oversight because
DOIT only had 33 percent (12 of 36) of the IV&V reports that it
should have received for the nine projects we reviewed during a
one-year period, as shown in Table 1.
We also observed that DOIT did not always have the periodic
progress reports that departments are supposed to submit. For
some projects, DOIT required quarterly reports and for other
projects, monthly reports. Specifically, for two of the nine
projects that we reviewed, DOIT had none of the department’s
quarterly reports for one project and only 2 of the 12 monthly
reports for the other. For three other projects, DOIT was missing
1 or 2 reports. It is difficult for DOIT to conduct effective
oversight if it does not have the departments’ reports on the
progress of their IT projects. According to DOIT, all departments
were to report on their projects monthly as of the fall of 2000.
26
TABLE 1
Status of IV&V Reports on Nine Projects Experiencing
Significant Cost and/or Schedule Overruns
(October 1999 Through September 2000)
IV&V Reports
Department Project Name Received Expected
Controller, State Automated Travel Expense 0 4
Reimbursement System
Corrections, Department of Revocation, Scheduling, and NA NA
Tracking System
Employment Development Tax Engineering 5 12
Department and Modernization
Franchise Tax Board Accounts Receivable 1 4
Collection System*
Health and Human Services Electronic Benefits Transfer NA NA
Agency Data Center
Health and Human Services Statewide Fingerprint 6 12
Agency Data Center Imaging System
Health Services, Department of Medi-Cal Management 0 4
Information System/Decision
Support System
Transportation, Department of Advanced Toll Collection NA NA
and Accounting System
Water Resources, Department of Cost Allocation and NA NA
Repayment System
Totals 12 36
* Instead of an IV&V consultant, this project had a project oversight consultant who
focused primarily on the financial, personnel, schedule, and documentation matters
related to project management.
NA = Not Applicable—DOIT did not require IV&V reports on these projects.
Additionally, although DOIT now requires monthly reporting, it
does not require specific information that would help it measure a
project’s progress against planned timelines and resource usage.
For example, although DOIT requires a monthly narrative on
project status, including project schedule dates and expenditures
by fiscal year, it does not require monthly reporting of two types of
critical information. First, it does not require the department to
compare the project’s monthly actual costs and revised estimates
of total projected costs with the budget. Second, DOIT does not
require departments to compare actual and revised projected
completion dates for project phases with the original schedule.
This information would be readily available if departments had
27
sound project management plans to appropriately track and
monitor their efforts. As a result, DOIT is not informed when a
project first starts to miss targets for cost and completion date.
DOIT may receive this additional information when depart-
ments submit special project reports. However, departments
submit special project reports only after significant changes
have occurred or are expected to occur to their IT projects—
typically increases or changes in cost or schedule of more than
10 percent. Relying exclusively on special project reports does
not assist DOIT in the ongoing oversight of projects before they
have become recognized problems.
The Advanced Toll Collection and Accounting System (ATCAS)
project provides a good example of the need for DOIT to
adequately monitor a project and require regular reports to learn
when a project is experiencing significant cost overruns, delays,
and problems. When approving the feasibility study report in
1996 that the Department of Transportation (Caltrans)
submitted to justify the need for the project, DOIT stipulated
that Caltrans provide periodic progress reports. However, the
Because it did not require reports were due only at specific milestones: at the successful
periodic reports on a completion of three specific phases of the ATCAS development.
Caltrans project over a However, when Caltrans redefined these phases in May 1998, it
four-year period, DOIT did not report the changes to DOIT. It also did not report on its
was not informed when progress to DOIT during the following two years of the project
the costs significantly because it did not successfully complete any of the redefined
increased—ultimately phases. As a result, Caltrans submitted no progress reports to
from $27.8 million to DOIT for a four-year period after DOIT approved the project,
$56.1 million. even though the project experienced significant changes from
what was envisioned. Finally, in August 2000 Caltrans submitted
a special project report requesting approval for cost increases and
delays on ATCAS. Ultimately, estimates for one-time costs—costs
to fully develop this project but not for continuing operations and
maintenance—had increased from the original $27.8 million to
$56.1 million. DOIT would have been aware of project slippage as
it occurred if it had required monthly reporting of two critical
pieces of information: the project’s monthly actual costs and
revised estimates of total projected costs compared with the
budget, and actual and revised projected completion dates for
project phases compared with the original schedule.
DOIT has begun to reengineer its project oversight by using
performance metrics to evaluate the status of IT projects under
development. DOIT believes the use of metrics to track key
28
project characteristics will allow it to rate how well projects are
progressing and act as an early warning of troubled projects.
DOIT used a similar process to monitor departments’ efforts
during the year 2000 effort. However, it is too early to determine
the extent to which this process will enhance DOIT’s oversight.
DOIT Is Not Receiving Information on All Projects
Under Its Oversight
Departments do not always submit special project reports when
they should, making it difficult for DOIT to properly oversee
their efforts. For example, the ATCAS project experienced major
cost increases and schedule delays after DOIT approved the
feasibility study report in 1996. Despite the need to do so
sooner, Caltrans did not report these problems until
August 2000 when it submitted a special project report. In
another instance the Department of Corrections significantly
altered the scope of an approved project, causing one-time costs
to increase from an originally estimated $3.7 million in
July 1997 to $6 million in December 2000. However, the
Department of Corrections submitted a special project report
requesting funding after rather than before it made the
alterations. In both cases the Department of Finance approved
the continuation of project expenditures but expressed concern
about the lack of reporting and asked DOIT to remind the
departments of their responsibility to report properly.
Departments are primarily responsible for the planning, devel-
opment, and quality assurance of their projects. In passing the
Departments that do not legislation that established DOIT, the Legislature intended that
report to DOIT as they DOIT would be a means of helping to ensure the success of the
should frustrate the intent State’s IT efforts. Therefore, departments must come forward
of DOIT’s oversight role. with their problems so that DOIT can be in a position to assist
them. However, if departments do not report to DOIT as they
should, they frustrate the intent of DOIT’s oversight role.
DOIT Has Not Ensured That Departments Evaluate
Completed Projects
DOIT has not ensured that departments submit reports
evaluating their IT projects after completion. Moreover, for
the relatively small number of postimplementation evalua-
tions (evaluations) it has reportedly received, DOIT has not
demonstrated that it performed the analyses necessary to
ensure that projects are meeting departments’ goals. As a
29
result, departments have not been held accountable for the
promised benefits from planned IT projects. DOIT believes
that the current evaluation report process does not provide
value, and it plans to reengineer the process.
Under state policy, departments must evaluate the success of
completed IT projects and compare the original timelines, costs,
and benefits with the actual by preparing evaluation reports. In
Evaluations of completed addition, departments must provide analyses if projects are not
projects are needed to successful or had significant differences between original and
hold departments actual timelines, costs, or benefits. In these instances the analy-
accountable for the ses must include the actions the departments intend to take to
estimated costs and improve outcomes. DOIT’s records show it receiving roughly
promised benefits of these 87 evaluations from departments since 1996. However, the
projects. Legislative Analyst’s Office believes that there could be more
than 400 completed IT projects for which departments have not
submitted evaluation reports.
By requiring departments to compare the actual costs and
benefits against those included in feasibility study reports that
departments must submit to justify planned IT projects, DOIT
could make departments accountable for their early promises.
DOIT could not provide any evidence that it analyzed any of the
87 reports it did receive. Further, as indicated by the Legislative
Analyst’s Office in its analysis of the fiscal year 2001-02 budget,
DOIT does not keep sufficient records of completed IT projects
and gives the review of these reports low priority. DOIT believes
that most people associated with IT in California recognize that
the current evaluation report process is weak and does not
provide much value. DOIT acknowledges that until recently it
did not devote much time or effort to reviewing evaluation
reports because it plans to reengineer the process. Part of DOIT’s
reengineering is to incorporate into the evaluation process the
lessons learned––successes as well as problems––during project
development. DOIT states that it recently has begun to review a
few evaluation reports to prepare for its reengineering effort,
which it expects to complete by fiscal year 2003-04.
DOIT’S NEW STRATEGIC VISION FOR THE MANAGEMENT
OF PROJECTS MAY IMPROVE ITS PROCESSES
DOIT believes a key element of its strategic vision to improve
the oversight of departments’ IT efforts is its enterprise portfolio
management program. This new program encompasses the
entire life cycle of the State’s IT development. DOIT states that
30
the new program involves a continuous improvement process to
ensure that IT policies, processes, and procedures keep pace with
changing technology and indicates that it is working with
departments, control agencies, and the private sector to
reengineer its existing practices. It starts with developing a
statewide inventory of IT projects, which DOIT anticipates using
to measure the progress of departments’ efforts against their IT
plans. Implementing a review of department IT plans and
continuously updating IT policies, procedures, and standards are
additional components of the new program. DOIT also intends
to improve the planning and approval of IT projects by
reengineering the feasibility study report process. The next step
in the life cycle is project oversight. DOIT’s new project over-
sight vision is intended to support project management best
practices and rigorous performance metrics. Each project is
closed out through the evaluation report process. Upon comple-
tion, projects will become part of the DOIT inventory of IT
projects, thus completing the technology life cycle. Finally, the
last two steps in the program are maintenance and operations
related to completed projects and asset management. DOIT
envisions revising each step in the project life cycle to enable
better management over IT projects.
Although DOIT’s new strategy appears to have merit, it is too
early to evaluate because DOIT has only begun to make changes.
The proposed inventory of IT projects, which is discussed in
Chapter 3, has only recently begun. DOIT has acquired the
information to complete the inventory but will need to ensure
the information in the inventory is complete and accurate. In
addition, as mentioned earlier in this chapter, DOIT has recently
Although DOIT’s new begun a pilot of its new process for reviewing feasibility study
strategy appears to have reports. This pilot involves the new projects of 10 departments.
merit, it is too early to DOIT plans to use this process for all new projects beginning in
assess the value it may early 2002. Further, DOIT recently provided us with the perfor-
add. mance metrics it intends to use for project oversight, but it is too
early to determine the extent to which the metrics will enhance
its oversight. Moreover, DOIT will have to establish new internal
procedures and statewide policies before it can implement the
changes. As of May 2001, DOIT had provided us only draft
procedures for how its staff will review departments’ IT plans
and evaluation reports. Therefore, until DOIT actually completes
its planning and implements a new oversight framework, it is
not possible to assess the value it will add.
31
RECOMMENDATIONS
To provide strategic guidance for the State’s IT activities, DOIT,
in conjunction with the departments, the governor, the
Legislature, the Department of Finance, and other relevant
parties, needs to update the statewide IT plan to address the
current IT environment. In particular, the plan should establish
measurable objectives to show how the State intends to reach
its goals. Also, the plan should communicate priorities for
approval and funding of projects. To facilitate the establishing
of such priorities, DOIT should work in collaboration with the
entities previously mentioned.
To ensure departments’ IT strategic plans are consistently
evaluated for their compliance with the statewide IT strategy,
DOIT should implement a process to review department plans.
To provide appropriate department guidance and direction for
the IT development process, DOIT should consolidate the
various sources of policy and guidance, remove outdated policies
from published documents, and revise policies as needed to
reflect changing state needs. In addition, DOIT should resolve
the contradiction between its management memorandum and
the State Administrative Manual over the applicability of the
alternative procurement process. Finally, DOIT should work with
General Services to evaluate the alternative procurement process
and provide information to departments about how the process
could be most effectively used.
DOIT should continue its efforts to improve its project review
and approval process. However, it should ensure that the
changes result in a process that will subject proposed IT projects
to a thorough evaluation. Further, DOIT should ensure that
departments are properly assessing IT projects by comparing
departments’ feasibility study reports with established criteria,
such as the fundamental decision criteria. Moreover, to ensure
that it can defend its approval of costly IT projects, DOIT should
thoroughly document its approval decisions.
To ensure departments assess and mitigate project risks, DOIT
should require complete risk assessment reports from
departments. Further, DOIT should properly analyze the
responses and document how it resolves any concerns. Finally,
DOIT should require departments using the alternative
procurement process to assess risks at the beginning of their
32
projects. If DOIT believes its current model is inappropriate for
alternative procurements, it should modify its risk model to
more appropriately address alternative procurements.
To ensure that it receives and effectively uses the proper infor-
mation to monitor departments’ IT projects, DOIT should take
the following actions:
(cid:127) Continue with its efforts to restructure the oversight process
to ensure that the process allows DOIT to properly monitor
and guide projects.
(cid:127) Modify the required progress reports to include two types of
critical information: the project’s monthly actual costs and
revised estimates of total projected costs compared with the
budget, and actual and revised projected completion dates for
project phases compared with the original schedule. DOIT
should use this modified progress reporting to closely
monitor projects that may be required to submit special
project reports.
(cid:127) Ensure that analysts sufficiently review and document their
oversight of projects and track the receipt of required reports.
To hold departments accountable for the benefits expected from
their IT projects, DOIT should ensure that departments submit
postimplementation evaluation reports. Further, DOIT should
continue with its effort to reengineer the evaluation process
including the incorporation of lessons learned from project
n
development.
33
Blank page inserted for reproduction purposes only.
34
CHAPTER 2
Some State Departments Are
Not Managing Their Information
Technology Efforts According to
Best Practices
CHAPTER SUMMARY
T
he last chapter reviewed the Department of Information
Technology’s (DOIT) leadership, guidance, and oversight
responsibilities for the State’s information technology (IT)
projects. Departments, however, are primarily responsible for
planning, developing, and ensuring the quality of their own
projects. Based on our in-depth review of four major IT projects
that were nearing completion, we found that departments are
not always using best practices to manage their IT projects. We
categorized these best practices into the areas of planning and
procurement; design, development, and implementation; and
quality assurance. In particular, two projects we reviewed at the
Department of Transportation (Caltrans) and the Department of
Health Services (Health Services) had significant weaknesses,
particularly because the departments did not always plan the
projects appropriately. For example, Caltrans did not develop a
supportable justification for a complex project begun in 1993,
which is still in progress. Two other projects at the Employment
Development Department and the Franchise Tax Board were better
managed but also experienced some cost and schedule overruns.
OUR REVIEW OF BEST PRACTICES FOCUSED ON
PROJECTS AT FOUR DEPARTMENTS
We reviewed four major projects that were nearing completion
to evaluate how well the departments managed these projects.
Because they had experienced varying degrees of cost and
timeline overages compared with the departments’ original
estimates, all these projects had submitted special project
reports, which DOIT and the Department of Finance subse-
quently approved.
35
(cid:127) Advanced Toll Collection and Accounting System (ATCAS)
A Caltrans initiative to replace the existing toll collection and
accounting system and install electronic toll collection on all
state-owned toll bridges. Electronic toll collection is intended
to eliminate the need for participating drivers to stop at
tollbooths to pay tolls. Instead, as vehicles with special elec-
tronic sensors pass the tollbooth, the sensors automatically
charge the drivers’ accounts. The current projected cost is
$56.1 million, 102 percent more than the original projected
cost of $27.8 million. ATCAS began in June 1993 and is
expected to be completed in December 2001.
(cid:127) Tax Engineering and Modernization (TEAM)
An Employment Development Department effort to redesign
the processing of employer tax returns and payments. The
projected cost is $71.7 million, which is 6 percent more than
its original projected cost. The project began in June 1997
and was completed in April 2001.
(cid:127) Children’s Medical Services Network Enhancement 47
(CMS Net E47)
A Health Services project to enhance an existing system by
linking it with the State’s medical and dental fiscal intermedi-
aries. The enhancement will implement electronic billing and
create a statewide patient, service authorization, and claims
settlement database for two programs that serve children from
low-income families and individuals who have certain genetic
diseases. The project is currently estimated to cost $10.2 mil-
lion and is 82 percent over the original estimate. The project
began in January 1998 and is expected to be completed in
December 2002; however, elements of the project related to
case management and eligibility for Medi-Cal and Healthy
Families were implemented in April 2001. Currently, 46 counties
use these elements.
(cid:127) Accounts Receivable Collection System (ARCS)
A Franchise Tax Board project intended to consolidate its
various automated and manual collection systems into one
system, thus making the Franchise Tax Board’s collection
efforts more effective and efficient for all its tax programs. The
project cost $36.3 million, 10 percent more than the original
estimate. ARCS began in April 1998 and was completed in
March 2001.
The best practices we used to evaluate the departments’ manage-
ment of these projects fell into three categories: planning and
procurement; design, development, and implementation; and
36
quality assurance. We reviewed the departments’ management
of their projects using certain best practices, including those
identified in a 1998 Legislative Analyst’s Office report and in
state requirements. We then rated their use of these require-
ments and best practices as strong, acceptable, weak, or inconsis-
tent. Generally, if the department’s project management
exceeded minimum standards in the area, we awarded a strong
rating, and if it met the minimum standards for an area, we gave
it an acceptable rating. We rated a department weak if project
management was deficient in an area that caused significant
problems, and we gave a rating of inconsistent to a department
that initially did not meet minimum requirements but acted
during the course of the project to correct the problem. Our
ratings of each department’s use of these requirements and
practices are presented in Table 5 in Appendix A.
The ATCAS and CMS Net E47 projects have experienced notable
difficulties in several of the areas we evaluated and as a result are
expected to cost significantly more than the initial projections. In
addition, ATCAS is seriously behind its originally scheduled
Employing best practices completion date. Both the TEAM and ARCS projects were generally
for project management better managed but also had areas with minor weaknesses.
will provide a greater However, even though TEAM and ARCS were generally better
chance of meeting managed, both experienced cost overruns and delays. The cost
original cost and overruns and schedule delays for all four projects are displayed in
schedule estimates. Appendix A. While we were not always able to link the cost and
schedule overruns to a department’s lack of best practices,
employing best practices for project management will provide a
greater chance of meeting original cost and schedule estimates.
PLANNING AND PROCUREMENT WEAKNESSES
CREATED PROBLEMS IN THE PROJECTS WE REVIEWED
Proper planning and procurement are critical to successfully
developing an IT project. We found several aspects of weak
planning in two of the IT projects we reviewed—the Caltrans
ATCAS and Health Services CMS Net E47 projects. For
example, Caltrans did not develop a supportable justification
and a well-defined problem statement for the project. In
addition, it did not employ a project management plan to help
it identify and resolve problems as the project developed. These
planning omissions played a part in creating a cost overrun of
102 percent and a delay of 59 months for the project now
scheduled to be completed in December 2001. Health Services’
weak planning and procurement practices also contributed to its
37
project’s potential 82 percent cost overrun and 15-month delay.
This project, according to its project manager, will not be
completed until December 2002.
To determine how well the departments planned and procured the
four projects, we evaluated how well the departments complied
with 11 best practices. Planning begins with clarifying project
goals by defining the pressing need or service that the department
hopes to resolve, the project scope, and the project management
methodology. These factors are among several that
constitute sound planning practices. Proper planning
Best Practices for Planning and is essential to set the stage for the project’s design,
Procuring an IT Project
development, implementation, and final quality. A
(cid:127) Define a problem statement and poorly planned project can result in significant cost
supportable business case. increases and delays, and in some instances, failure.
(cid:127) Outline the business problem and allow
the vendor to propose a solution.
The procurement of a vendor to develop an IT project
(cid:127) Clearly define and document the scope is also an important element of planning. Currently,
of the project.
sections of both state law and policy require that
(cid:127) Clearly define and document the use of
departments follow best practices for procurement.
project management methodology.
For example, the State’s contract laws require that
(cid:127) Sponsor the project through appropriate
departments award contracts for large IT projects to
commitment and involvement of
management, and include sufficient vendors that propose the most value-effective solu-
resources.
tion––an objective basis not limited to cost alone.
(cid:127) Base procurement on best value, not Another process, known as an alternative procure-
lowest cost.
ment, puts more responsibility for project risk on the
(cid:127) Use a vendor that provides and
vendor rather than the department by allowing
maintains sufficient qualified staff.
vendors to propose the solution for a department’s
(cid:127) Require a letter of credit from the vendor
business need. Since 1993 state policy has allowed
on a large project.
departments to use this process. Beginning in 1998,
(cid:127) Clearly define and document the risk
management plan. DOIT and the Department of General Services have
required that departments use an alternative procure-
(cid:127) Write a strong contract to adequately
protect the State. ment process, unless a different method is approved,
(cid:127) Enforce the terms of the contract. for any IT project deemed to be critical for the
department’s responsibilities and with an estimated
cost of $5 million or more. The alternative procure-
ment process is an approach that considers limiting
risk and developing the project in phases, business-based specifica-
tions structured to encourage maximum vendor innovation in
providing business solutions, and selection of the proposal that is
based on cost and other considerations so that it represents a best
value for the State.
38
Advanced Toll Collection and Accounting System
The main weakness of Caltrans’ planning approach was that it
failed to develop a supportable justification—called a business
case—and a well-defined problem statement for the project.
Both are important because they would have helped Caltrans
better understand the expected benefit of ATCAS, assess the
magnitude of the problem, and determine if the proposed
solution was realistic and achievable. Although one of the
purposes of the ATCAS project was to replace the obsolete
hardware and software components of its existing toll collection
and accounting system, Caltrans also wanted to enhance the
system with electronic toll collection, which would involve
identifying participating vehicles through an electronic sensor
Caltrans did not for the automatic payment of tolls. However, Caltrans’ feasibility
sufficiently justify the study report did not clearly differentiate the costs of these two
need for developing an distinct objectives. Moreover, Caltrans did not report that it
electronic toll collection would take six years before it recouped only half the cost of the
system for use on state- electronic toll collection system. Our review of details presented
owned bridges. on numerous pages of the feasibility study report indicates that
the estimated one-time cost of developing electronic toll collec-
tion was $18.3 million, but the expected benefits over the first
six years (Caltrans’ calculations did not go beyond that period)
were only $8.9 million. These savings were to come from fewer
toll collectors, interest earnings on deposits of participating
drivers, and time and fuel savings to the motoring public. Given
the optional and costly nature of electronic toll collection, it was
crucial that Caltrans clearly disclose the cost justification for the
system before committing taxpayer dollars. Subsequently,
Caltrans revised its feasibility study report to more clearly
disclose the costs related to electronic toll collection but still did
not demonstrate that it was cost beneficial.
In addition, Caltrans did not have a project management plan
until two years after development of ATCAS began. A project
management plan provides specific steps to administer and track
the progress of a project. Used appropriately, such a plan can
help managers ensure that they identify and remedy difficulties
before they become significant problems. In 1995, approxi-
mately two years after the project began, Caltrans developed a
project management plan, but the plan had many shortcomings
that led us to question how it would promote the delivery of a
quality IT project on time and within budget. Specifically, the
plan lacked a description of how Caltrans planned to monitor
the progress of ATCAS. It also did not clearly identify the tasks
required to successfully complete the project. In response to
39
DOIT’s concerns, Caltrans updated the project management
plan in October 2000, but it still fell short because it continued
to lack the details necessary for Caltrans to effectively manage
the project. Specifically, the updated plan still did not address
how to monitor progress, did not consider staffing needs and
budgets, and did not describe how to approve key elements of
the project. In contrast, we found these elements in the current
versions of the project management plans of the Franchise Tax
Board and Employment Development Department.
Another planning weakness is that Caltrans developed the
technical specifications to the proposed project rather than
letting vendors propose their designs. It is a best practice—and
now a state policy in large, critical IT projects—to allow vendors
to propose solutions to departments’ business needs, shifting
more responsibility for the project’s success to vendors, who are
subject-matter experts. Although it may be appropriate for a
department to design a small, narrowly defined project, this
approach is not always prudent in large, complex projects. It
appears that Caltrans’ original technical specifications ulti-
mately did not describe the project as it exists now. Given the
numerous changes that ATCAS experienced, Caltrans’ decision
to define the specifications itself rather than having the vendor
do so likely contributed to the cost and schedule overruns on
this project.
Tax Engineering and Modernization
Planning of the TEAM project demonstrated strength in several
areas: its defined problem statement and supportable business
case; technical solutions proposed by the vendor rather than the
department; and the quality of its contract with the vendor that
The Employment formed a partnership designed to share the risk, investment, and
Development benefits of the proposed project. In particular, the Employment
Department’s contract Development Department structured the contract so that the
with its vendor was vendor would only be paid from the savings that TEAM would
structured to pay the produce by eliminating the need for more than 350 positions.
vendor only for To be paid, the vendor had to demonstrate savings from imple-
demonstrated savings menting certain phases of TEAM. Thus the contract established
from implementing the a strong incentive for the vendor to develop a viable project.
TEAM project. This arrangement has been successful in that TEAM has been
recently completed, although almost two years late, and the
Employment Development Department has saved 330 positions,
which is close to the savings originally estimated.
40
However, we noted a significant staffing problem that delayed
the project. We found that high turnover among critical vendor
staff––the project manager and the quality assurance manager—
as well as insufficient and inadequately skilled vendor staff
likely contributed to most of the nearly two-year delay in
development of TEAM. More specifically, the vendor had four
different project managers over TEAM’s four-year development.
In addition, the vendor failed to fill the vacant quality
assurance position for nearly 11 months, which contributed to
the vendor delivering poor quality products. The vendor’s
current project manager indicated that when he took over in
April 2000, he recognized the need to add staff to the project
and to replace existing staff with better skilled staff. In addition,
we noted that the Employment Development Department’s
oversight consultant monitored and also reported on the
vendor’s staffing problems.
Another issue was that the Employment Development Department
was inconsistent in its development of a clearly defined and
For the first two years of documented project management plan. Specifically, the initial
the TEAM project, the project management plan included in the feasibility study report
Employment Development did not include the methodology used to monitor the progress of
Department did not have the TEAM project. In addition, the plan did not include a schedule
a clearly defined and that identified all the tasks necessary to complete the project. The
documented project plan also did not describe how approvals on key elements of the
management plan. project would be handled. With these elements missing, it was
more difficult to manage and monitor TEAM’s progress. A second
project management plan, developed more than two years later
at the recommendation of the independent consultant that the
Employment Development Department hired to perform
project oversight, was more comprehensive and included the
required elements.
Children’s Medical Services Network Enhancement 47
After working on this project for more than three years and experi-
encing delays and significant problems, Health Services is now
rethinking the technical direction of CMS Net E47. In a recent
assessment that DOIT required, a technical consultant concluded
that the project as currently planned was technically feasible but
did not represent a sound architectural plan. The consultant
reached this conclusion because the development software and
database management system were not widely used or easily
supportable, and because neither are supported by Health Services’
current IT infrastructure. The consultant recommended that
Health Services use the alternative procurement process to obtain a
41
vendor to complete the remaining elements of the project. At this
time project costs are expected to exceed $10 million, almost
double the original estimated cost of $5.6 million. Thus our review
focuses on the planning and procurement weaknesses in Health
Services’ approach that led to this point.
We observed that Health Services’ primary weakness in planning
and procurement was how it obtained the services of vendors to
develop the project. When planning CMS Net E47 in 1995,
Health Services determined that it needed a vendor to develop
the project. However, rather than following the best practice of
outlining its business problem and requesting solutions from
The Department of vendors, Health Services developed the specifications itself. As a
Health Services’ result, Health Services missed the opportunity to obtain
contracting practices innovative approaches from industry experts and to transfer the
provided little incentive development risk from the State to the vendor. In addition,
for vendors to complete rather than selecting the vendor on the basis of best value—the
the work and exposed the best combination of experience, solution, and cost—Health
State to unnecessary risk. Services awarded the contract to the vendor that submitted the
lowest bid. Further, Health Services did not ensure that the
contract included language to protect itself if the vendor did not
complete its work. The contract also did not require that a
portion of payments to the vendor be retained until the vendor
performed satisfactorily. Consequently, the procurement
method provided little incentive for the vendor to make sure
that the project functioned as intended. Additionally, as a result
of the lack of adequate contract terms, the State may find itself
in a compromised situation if a conflict arises. We discuss the
effect that structuring the contract in this manner had on the
department’s quality assurance efforts later in the chapter.
Accounts Receivable Collection System
Two noteworthy areas in the Franchise Tax Board’s planning
were how it addressed the lack of qualified programmers and
structured the contract with the vendor who assisted in the
development of ARCS. Specifically, the Franchise Tax Board
considered the alternative of developing the new project itself,
capitalizing on its experience with a similar project. However, it
rejected this idea because its analysis showed, among other
disadvantages, that the project’s complexities would cause a
delay in implementing collection programs and receipt of the
projected increased collections. The Franchise Tax Board also
determined that the project would cost at least twice as much if
it solely used in-house staff for development. The Franchise Tax
Board’s solution was to use a combination of in-house and
42
contracted services. To develop ARCS, it integrated vendor staff
and state employees into the development team, because it felt
that it would not be able to hire fully qualified programmers. By
hiring and training state employed junior programmers to work
with more experienced vendor staff, a core of experienced and
trained state staff would be available to maintain the project
after development, and the Franchise Tax Board would avoid
having to depend on long-term maintenance contracts with the
vendor. This approach might have worked, but during the last
six months of the ARCS project, 14 state staff and 4 managers,
including the project manager, left the project to work on
another large IT project that the Franchise Tax Board was
required to undertake––the legislatively mandated child support
system. This exodus undermined its strategy, and as a result the
Franchise Tax Board must now rely on the vendor to maintain
and enhance ARCS.
Another positive approach that the Franchise Tax Board took
was structuring the vendor’s contract to share increased
revenues that ARCS was intended to produce and thus gave the
vendor a powerful incentive to develop a successful project. The
Franchise Tax Board anticipated the project would increase
revenues by approximately $76.5 million in the first four years
at a one-time start-up cost of $33 million. Further, it structured
the contract to have the vendor pay the start-up cost until the
project produced actual revenues. Thus far this
arrangement has proven successful, resulting in
Best Practices for Designing, increased revenues of more than $150 million,
Developing, and Implementing an exceeding the original estimate, according to the
IT Project
Franchise Tax Board’s independent oversight
(cid:127) Design, develop, and test the project consultant.
appropriately according to specifications.
(cid:127) Establish measurable objectives for the
project.
DEPARTMENTS’ DESIGN, DEVELOPMENT,
(cid:127) Prioritize project elements, such as budget,
AND IMPLEMENTATION EFFORTS NEED
schedule, and functionality, up front.
IMPROVEMENT
(cid:127) Develop smaller projects with milestones.
(cid:127) Use sound project management practices Once a department plans a project, obtains
during implementation.
approval, and procures a vendor to assist in
(cid:127) Establish appropriate policies and
development, its attention focuses on project
procedures to manage and control changes
to the developing project. management as it implements the project. Project
management was troublesome for two of the
(cid:127) Develop an adequate information security
system to detect and prevent inappropriate projects we reviewed, particularly for the ATCAS
access.
project and, to a lesser extent, the CMS Net E47
project. For example, Caltrans moved ahead with its
ATCAS project despite the fact that the project had
43
not passed critical interim tests. Additionally, Health Services did
not consistently use sound project management practices during
the development of its project. To successfully implement an IT
project, a department should consider seven design, development,
and implementation factors. For example, when a department
establishes quantifiable goals, it can measure the project’s progress
and determine whether the project is meeting its objectives.
Employing sound project management practices is also critical to
ensuring that the department keeps control of the project during
development. Project cost increases and schedule delays, along
with poor-quality products, can result when a department
manages IT project development poorly.
Advanced Toll Collection and Accounting System
The ATCAS project has experienced several significant problems
in its development. For instance, legislation passed in 1997
required Caltrans to change the basis for assessing toll fees from
vehicle classification to the number of axles. This switch
required reworking the hardware and software for electronic toll
collection. Caltrans also had problems with the performance of
its vendor, which culminated in a dispute settlement in
December 1999. Other problems resulted from how Caltrans
managed the development of ATCAS.
For example, Caltrans did not always perform testing of ATCAS
Despite not having components as it should have. Testing the key components of a
completed acceptance project is critical to ensuring that a project functions as intended
tests of the vendor’s and is not disruptive when implemented. Since 1996 Caltrans
design for electronic toll and its vendor have been working on a prototype on one bridge
collection, Caltrans to test and demonstrate the vendor’s model design for electronic
installed the system on toll collection. In July 2000 Caltrans decided to partially deploy
other toll bridges. ATCAS on other bridges, which it completed in December 2000.
However, Caltrans went ahead with this deployment without
completing acceptance tests to ensure that the vendor’s
prototype functioned as intended. For example, although all the
State’s toll bridges had the ATCAS hardware and software
installed on at least one lane, Caltrans has not finished
acceptance tests of the accounting portion of the software and
the system that is supposed to detect and identify vehicles not
participating in the electronic toll collection program on these
bridges. Caltrans indicated it performed other validations of the
vendor’s prototype to ensure that no major problems would
occur and expects to complete acceptance tests in June 2001.
44
Nevertheless, as a result of Caltrans’ decision to implement
ATCAS before completing acceptance tests, problems may exist
that have not been identified at each of the bridges and may
need to be corrected later.
Caltrans has also failed to use sound project management
Because it did not practices during the development of the ATCAS project. For
sufficiently document example, Caltrans repeatedly assigned project managers who
critical decisions or had little or no experience managing an IT project of the size or
communicate progress, complexity of ATCAS. In addition, none of the managers
Caltrans did not ensure assigned to the project were certified as project managers, an
that its management or indication of specific training in project management principles.
DOIT had the information Further, Caltrans did not demonstrate that it sufficiently
needed to effectively monitored the project’s progress. Although Caltrans conducted
monitor the project. weekly project team meetings and executive steering committee
meetings, Caltrans could provide only limited notes and
minutes to demonstrate that it had documented the issues
discussed and agreements reached in these meetings. In fact, in
October 1997 Caltrans’ technical consultant for the project
recommended that meetings be documented, but apparently
Caltrans chose to ignore the recommendation. As a result of not
documenting critical discussions and decisions, Caltrans’
management did not have sufficient information to properly
oversee the project. In addition, had Caltrans used sound project
management practices, it would have communicated the
progress of ATCAS not only to department management but to
DOIT as well, allowing DOIT to effectively monitor the project.
In fact, DOIT had previously required Caltrans to submit
progress reports after the completion of specific phases, but
when Caltrans redefined the phases, it did not report the
changes or its progress to DOIT. Caltrans’ less than rigorous
application of sound project management practices contributed
to cost and schedule overruns for the ATCAS project.
Tax Engineering and Modernization
This project had difficulties with its change control process and
the information security system for TEAM. Before the current
project manager came on board in February 1999, the
Employment Development Department did not have any formal
process to control and monitor project changes. When a change
control process is lacking, a department cannot ensure that only
the staff that will use the completed IT project can initiate the
changes, that the appropriate management staff approves
45
changes, and that changes are reviewed before they are
implemented. The current process allows the project team to
appropriately track and monitor changes.
We also observed certain weaknesses in IT security over the
TEAM project. The details of these weaknesses have been shared
with management of the Employment Development Depart-
ment. The Employment Development Department intends to
implement appropriate security procedures by June 2002.
The first project manager
Children’s Medical Services Network Enhancement 47
that the Department of
Health Services assigned Although we rated Health Services’ design, development, and
lacked the appropriate implementation acceptable overall, we had several concerns.
skills or background Health Services did not consistently use sound project
necessary for the project. management practices during the development of the project.
Specifically, the project manager assigned to the CMS Net E47
project from March 1998 through November 1999 lacked the
appropriate skills or background necessary for a large,
complicated project. In addition, the job classification of this
project manager––a staff information systems analyst––was not
at a level that would provide the authority needed to effectively
manage and direct staff of various job classifications. During the
period the first project manager was assigned, certain basic
project management tasks were not performed consistently.
These tasks included updating the risk management plan,
tracking problems to resolution, developing procedures to
control and monitor changes, and documenting project
meetings. Health Services hired an independent verification
and validation (IV&V) consultant in November 1998 to ensure
that appropriate project management practices were followed.
Health Services believes that after November 1998 the IV&V
consultant helped it address these issues. Health Services
finally hired a state employee with the appropriate
qualifications and job classification to manage the project in
December 2000. In the interim, from December 1999 through
November 2000, Health Services hired a consulting firm to
provide a project manager.
We also observed certain weaknesses in the IT security over the
CMS Net E47 project. The details of these weaknesses have been
shared with management of Health Services. Health Services is
studying how to implement appropriate security procedures.
46
Accounts Receivable Collection System
Despite problems it encountered due to changes in requirements
and schedule slippage, the Franchise Tax Board used sound
project management practices during its implementation of the
ARCS project. For example, after planning the project by getting
high-level executive sponsorship and user involvement, the
Franchise Tax Board and the vendor committed enough staff
with appropriate skill levels to ensure the success of the project.
In particular, the Franchise Tax Board and the vendor both
employed project managers with sufficient experience and skills.
They also monitored the progress of system design, develop-
ment, and testing. Specifically, for each phase of the project, the
ARCS team created a general scope and approach document and
then formulated a detailed work plan that became the basis for
the management of the project. The project also had a change
control process that allowed the project managers to monitor,
control, and track changes to the project or the project plan.
Moreover, the consultant the Franchise Tax Board hired to
provide oversight on the ARCS project stated in its final report
of April 2001 that ARCS management staff did an excellent job
of managing a complex and difficult project.
DEPARTMENTS GENERALLY FARED WELL IN THEIR
QUALITY ASSURANCE EFFORTS
Quality assurance procedures help departments identify and
assess the significance of problems that occur as projects are
implemented. Two of the projects experienced problems with
their quality assurance. Caltrans failed to use an
independent consultant to monitor the develop-
Best Practices for Ensuring the
ment of its ATCAS project. Also, Health Services
Quality of an IT Project
hired a consulting firm that provided both project
(cid:127) Create an effective quality assurance management and independent oversight services
mechanism and use it during each phase
for the CMS Net E47 project. This resulted in an
of development.
incompatible situation because the consulting
(cid:127) Heed the advice of the oversight consultant
or explain why it is not applicable. firm was supposed to provide objective oversight
of the project.
(cid:127) Pay the vendor only after accepting tested
project deliverables.
We reviewed how each of the four departments’
quality assurance procedures complied with three
best practices. We noted that consultants can
perform various quality assurance functions to evaluate the
progress of an IT project under development. For example, project
oversight consultants help departments identify and assess the
47
significance of problems that occur as projects are implemented.
An IV&V consultant takes this a step further by following a
prescribed process to assess the primary vendor’s performance and
making recommendations to the department on how to obtain a
better quality product. Quality assurance helps minimize risk by
identifying potential problems earlier rather than later in the
project’s development and implementation phases.
Advanced Toll Collection and Accounting System
Despite the fact that ATCAS was a complex and costly project,
Caltrans failed to employ an IV&V consultant for almost the
entire project, and when it did hire one in 1997, Caltrans
changed the consultant’s duties. Rather than assessing, among
other things, the quality of the technical work and overseeing
the project, the IV&V consultant provided technical assistance.
In January 2001 Caltrans finally contracted with another IV&V
consultant to provide project oversight and quality assurance
consulting services to support the ATCAS effort. However,
Caltrans states it hired the contractor only after DOIT required it
to do so. Using an IV&V consultant earlier in the project might
have ensured that the vendor’s model design for electronic toll
collection passed Caltrans’ testing and might have avoided some
The Employment of the cost overruns and delays that the project experienced.
Development
Department’s decision to
Tax Engineering and Modernization
hire an independent
verification and The Employment Development Department’s quality assurance
validation consultant efforts on the TEAM project were effective because it hired an
helped ensure the IV&V consultant to help it ensure that the primary vendor met
vendor’s products met the quality standards of the contract. The IV&V consultant hired
quality standards. by the Employment Development Department used industry
standard methodology to review all phases of the project,
assisted the department in developing a formal project plan and
requirements to achieve the business objectives, and tracked the
project requirements through all phases of the development
process. In addition, the consultant frequently reported findings
and made recommendations to the appropriate staff levels of the
Employment Development Department.
Children’s Medical Services Network Enhancement 47
We noted a concern over how Health Services used two
individuals from the same consulting firm to help it manage the
CMS Net E47 project and to oversee project management. In
November 1998 Health Services hired a consulting firm to
48
provide an individual as the IV&V consultant to oversee the
project. In November 1999 Health Services asked the same firm
to provide a project manager to assist it in the development of
its CMS Net E47 project. However, because Health Services had
hired both individuals—the project manager and the IV&V
consultant—from the same firm, it may have made it difficult
for the IV&V consultant to objectively oversee the performance
of the project manager. It was not until August 2000, nine
months after the potential conflict of interest occurred, that this
The Department of issue was resolved when the IV&V consultant resigned from the
Health Services paid a project. Even though it appears that the IV&V consultant’s
vendor for hours worked, recommendations were valuable and much needed, a potential
not for deliverables conflict of interest existed. As of April 2001, Health Services still
produced, and thus had not hired a new IV&V consultant.
accepted the majority of
risk for the vendor’s work. We also found that Health Services did not ensure the quality of
its project because it used a procurement and payment method
that did not sufficiently protect the State. To safeguard state
investments, a department should pay a vendor only after
accepting the deliverable and verifying that it meets the terms
of the contract. However, Health Services paid the vendor
100 percent of billed hours the vendor invoiced each month.
Additionally, Health Services did not withhold a reserve to be
paid on completion of acceptance testing or on approval of
final implementation. Specifically, beginning in June 2000,
Health Services used a vendor from the California Multiple
Award Schedule (CMAS) program—a procurement process in
which departments neither solicit nor evaluate bids from
vendors. CMAS offers products or services and prices from an
existing list of vendors that have been competitively assessed.
Health Services’ contract required that the vendor develop and
provide application modules—computer programs—to Health
Services for the project team to review and test. Our review
found that Health Services paid the vendor based on the amount
billed, even though the modules were not completed. By not
structuring its agreement with the vendor to pay only after testing
and accepting the deliverable, Health Services accepted the
majority of risk for the vendor’s work—a risk that, according to a
document prepared by DOIT, was increased by Health Services’
piecing together the project through CMAS contracts.
Accounts Receivable Collection System
The Franchise Tax Board generally complied with best practices
in the quality assurance area. Although the project is completed
and generally functioning as intended, employing an IV&V
49
consultant could have minimized potential problems. When
development began in 1998, DOIT required the Franchise Tax
Board to hire a project oversight consultant. The Franchise Tax
Board chose to hire an oversight consultant rather than contract
with an IV&V consultant. The oversight consultant focused on
reviewing the project’s finances, personnel, schedule, and docu-
mentation, not the requirements, design, testing, and imple-
mentation details that an IV&V consultant is required to review.
As a result, the Franchise Tax Board did not have the benefit of
information that would have enabled it to make better informed
decisions had problems developed with the quality of the
vendor’s work.
RECOMMENDATIONS
To improve the management of IT projects and to help ensure
that projects are completed on time and within budget, Caltrans
should take the following actions:
(cid:127) Develop a problem statement for each IT project that
adequately describes the problem the project is intended to
solve with quantifiable goals, and establish a supportable
business case for each project that justifies its funding.
(cid:127) Develop an effective project management plan before begin-
ning to develop each project so it can monitor the progress of
the project.
(cid:127) Allow vendors to propose solutions and the technical
specifications for its large and complex IT projects.
(cid:127) Ensure that testing is completed at appropriate phases to
identify and resolve problems before moving ahead.
(cid:127) Ensure that it uses sound management practices during the
development of each project, such as assigning qualified
individuals with appropriate experience and training to
manage the project, documenting key discussions and
decisions, and monitoring progress through periodic reports.
(cid:127) Use IV&V consultants on complex IT projects.
50
To improve the management of IT projects and to help ensure
that projects are completed on time and within budget, the
Employment Development Department should take the follow-
ing actions:
(cid:127) Ensure that the vendor provides sufficient staff with the
necessary training and experience.
(cid:127) Use an effective project management plan before beginning
to develop each project so it can monitor the progress of the
projects.
(cid:127) Ensure that it establishes and uses a process to control and
monitor project scope changes that requires changes to be
adequately reviewed before they are made.
(cid:127) Correct the IT security weaknesses we identified.
Health Services should take the following actions to improve the
management of IT projects and to help ensure that projects are
completed on time and within budget:
(cid:127) Select vendors that propose the best solutions at the best
value.
(cid:127) Structure contracts with vendors to protect the interests of the
State, including provisions to pay vendors only after
deliverables have been tested and accepted.
(cid:127) Use sound project management practices during the design,
development, and implementation phases of projects and
specifically ensure that it assigns project managers with the
appropriate skills and authority.
(cid:127) Correct the IT security weaknesses we identified.
(cid:127) Ensure independent oversight of its projects by hiring IV&V
consultants from firms that are different from those providing
other services to the project.
To improve the management of IT projects and to help ensure
that projects are completed on time and within budget, the
Franchise Tax Board should use not only project oversight
consultants but also IV&V consultants throughout the
development of its complex projects to make better informed
n
decisions should problems occur.
51
Blank page inserted for reproduction purposes only.
52
CHAPTER 3
DOIT Has Not Fully Satisfied Its
Other Responsibilities
CHAPTER SUMMARY
I
n addition to the Department of Information Technology’s
(DOIT) problems addressing its project planning and
oversight responsibilities as described in Chapter 1, DOIT
has not fully met its other responsibilities. The Legislature
envisioned that DOIT would improve the State’s ability to apply
information technology (IT) effectively; however, DOIT’s
inability to prioritize its efforts contributes to it only partially
carrying out its responsibilities. For example, DOIT has not
established a process to consistently address the coordination of
IT project development. Also, DOIT still needs to compile an
accurate inventory of IT projects, which could be a valuable
resource in coordinating departments’ activities and enhancing
its oversight. In addition, DOIT has only recently prepared
drafts of several key standards for IT development activities that
establish common rules and could encourage the use of best
practices, and has not yet begun to develop other standards.
Further, DOIT has inconsistently used the two statutorily
required IT advisory councils to discuss key policies and
strategies. DOIT’s failure to fulfill its responsibilities and
complete several initiatives designed to better manage the
State’s IT efforts lessens its credibility with outside parties.
Finally, DOIT has not developed an internal strategic plan that
would help it prioritize its operations and organize its activities
that are currently scattered over a variety of initiatives.
DOIT HAS NOT TAKEN SUFFICIENT ACTION TO
COORDINATE INFORMATION TECHNOLOGY PROJECTS
Despite the mandate of state law, DOIT does not have an
established process to ensure that departments do not
independently develop statewide IT applications or duplicate
other departments’ efforts. Instead, departments have mostly
relied on informal networking to identify similar projects at
other departments. In addition, DOIT has not continuously
maintained an IT project inventory as required by state law. The
project inventory, if properly designed and updated, would help
53
coordinate activities and enhance the State’s ability to make a
conscious, proactive evaluation of how it allocates its limited
resources for IT projects. Without consistent coordination, the
State lacks assurance that it can identify overlapping or
redundant IT efforts. Additionally, without coordination,
departments do not benefit from each others’ knowledge of
technology and development approaches for projects addressing
similar business functions.
DOIT Lacks an Established Process to Consistently Identify
Coordination Opportunities
DOIT lacks an established process to consistently address the
coordination of IT project development. Although DOIT says it
uses its project approval and oversight activities to identify
departments with similar projects, these activities do not
include a consistent method for identifying common elements
across several projects. As a result, DOIT may not always
identify opportunities where departments could discuss similar
projects. As part of its revised feasibility study
report process, DOIT plans to improve its ability
to identify projects with similar characteristics by
Benefits of Project Coordination
creating a new database that will capture
(cid:127) The State can avoid the duplication of
information from more than 200 questions that it
processes and functions in its IT systems.
will ask departments about their proposed
(cid:127) DOIT can identify opportunities to leverage
projects. DOIT stated that it will be able to
IT development efforts across departments
to reduce costs and make departments’ IT identify similar projects once it implements its
systems compatible.
new database. However, DOIT has not finalized
(cid:127) DOIT can partner a department that is and implemented this process yet.
weak in a specific IT technology with a
department that is strong in that area.
DOIT’s past efforts in this area have been guided
(cid:127) Departments can learn from other
departments’ experiences. by a 1997 committee report on coordinating work
on administrative systems—those relating to
(cid:127) Departments can see other types of
procurement that may suit their current departments’ accounting, human resources,
needs.
procurement, and inventory functions. Among
(cid:127) Departments can share experiences the committee’s recommendations to DOIT was
about how well vendors performed on past
designing and implementing pilot projects to
IT projects.
determine the feasibility of embarking on
statewide projects. In its 1998 annual report,
DOIT indicated that it had authorized pilot
projects of statewide systems at four departments.
However, DOIT could not demonstrate that it evaluated these
pilots to determine if statewide projects are warranted. In
addition, other departments have pursued projects that will
provide service across many departments, such as the payroll
54
and travel expense claims projects at the State Controller’s
Office and the procurement automation project at the
Department of General Services. Further, DOIT indicates that it
has participated in statewide efforts to coordinate IT activities,
including the statewide geographic information systems effort
and the governor’s electronic government (eGovernment)
initiative, which is intended to encourage departments to offer
services to citizens over the Internet through the State’s Web site.
Despite these efforts, DOIT lacks a consistent and proactive
approach to ensure that coordination occurs to the extent needed.
Based on its project review during the fall of 1999, DOIT claims
that there is very little commonality among IT activities. How-
ever, our review revealed that a number of departments are
developing projects in similar business areas. For example,
various departments use IT systems to manage client cases.
Specifically, during our review of major IT projects—those with
one-time development costs greater than $1 million—we found
13 departments that were developing or had developed
25 major case management projects. Assorted departments also
license individuals and businesses for a variety of purposes. We
found 9 departments that were developing or had developed
16 major licensing projects. With so many multimillion-dollar
projects addressing similar business functions at different
departments, DOIT needs to help departments share with each
other their knowledge of technology, development approaches,
and vendors.
Because DOIT has not effectively coordinated IT efforts, many
chief information officers (CIOs) we spoke with at various
departments indicated that they rely on informal networking to
identify possible coordination opportunities. Some departments
have established relationships with others that perform similar
functions to identify opportunities to share information and
In the absence of DOIT’s cooperate on IT projects. For example, staff from the Board of
leadership, many Equalization, the Franchise Tax Board, and the Employment
departments we spoke Development Department have met to identify coordination
with indicated that they opportunities. As a result of these meetings, the departments
rely on informal participated in several coordinated IT activities and have
networking to identify discussed how they could establish common methods for
coordination identifying businesses and accepting credit card payment of
opportunities. taxes. Although these actions by departments’ CIOs and staff
provide some coordination of IT activities, they do not
replace the more formal mechanism under DOIT’s leadership
that is needed.
55
DOIT’s Failure to Consistently Maintain a Project Inventory
Inhibits Coordination and Oversight
Even though state law instructed DOIT to create an inventory of
IT projects with approved feasibility study reports, DOIT has not
continuously maintained an up-to-date inventory that contains
sufficient information to be useful in project coordination and
oversight. To be beneficial, the inventory would need to contain
a variety of data, including project descriptions, costs, timelines,
technologies used, and vendors employed. A complete, central-
ized record of IT projects would be a powerful tool in the State’s
efforts to coordinate the activities of various departments and in
the efforts of the Legislature and control agencies to make
conscious, proactive evaluations of how the State spends its
limited IT resources. In addition, the inventory would improve
DOIT’s ability to monitor whether departments develop their
projects on time and within budget and allow department CIOs
to identify other departments developing similar projects.
In its 1996 and 1997 annual reports to the Legislature, DOIT
indicated that it was using a database that met the statutory
requirement for a project inventory. One portion of the database
reportedly allowed Internet access to an index of proposed IT
projects. The other part of the database apparently captured
ongoing information from independent oversight reports and
other reports about projects that were in development. However,
DOIT stopped using the database in 1998 because it believed the
database was not recording project data accurately.
DOIT reported that it collected information on 1,200 computer
systems during the year 2000 effort to help identify
departments’ progress in resolving computer issues. However,
DOIT indicated that the database only contained data on
projects impacted by the year 2000 problem that departments
had identified as mission critical. Therefore, DOIT has recently
In November 2000 DOIT taken steps to create a more complete project inventory. In
surveyed departments to November 2000 DOIT requested that 111 departments provide
obtain the information it information on up to 74 items for each project, including
believed was needed to development costs, start dates, vendors, and technologies used.
develop a useful project DOIT believed the breadth of the data available in the year 2000
inventory. database made it the appropriate starting point for a survey of
the departments’ IT activities. However, when DOIT created its
survey, it did not include additional detailed information that it
had previously received and was available in its project approval
and reporting documents. DOIT requested that departments
respond to the survey by January 2001. By April 2001 all
departments had responded.
56
Because we were asked to create a statewide
Problems and Inconsistencies inventory of major IT projects, we compiled
With Information Departments
information on 15 key fields from departments’
Submitted to DOIT
responses to DOIT’s survey. However, we found
(cid:127) Costs or project status initially not included that departments initially failed to include one-
for 55 percent of projects.
time development costs or project status for
(cid:127) Completed project costs based on rough 55 percent of the projects reported to DOIT. To
estimates or not provided, because
address these omissions, we sent portions of the
previously departments were only required
to report IT costs on an annual basis without surveyed information back to departments to
tying costs to specific projects.
encourage them to identify cost and status for all
(cid:127) Cost savings apparently reported as projects and to provide additional information
negative project costs instead of zero.
on the 15 key fields for major projects.
(cid:127) Differing standards used by departments to
Through these follow-up contacts, we found
determine which IT activities should be
reported, because they believed DOIT’s that departments’ responses contained many
definition of an IT project was unclear. For inconsistencies. We also asked five departments
example, some departments listed minor
to provide documentation for selected portions
activities, like spreadsheets and databases,
as projects, and others only listed projects of their responses to DOIT’s survey for 23 major
they were still developing.
projects. We found that 21 projects contained
(cid:127) Systems that were the responsibility of one at least one discrepancy each, where the
department reported by another. For
reported information did not match underlying
example, CALSTARS, which is the State’s
financial system, was included in several documentation. We found that 6 of these
departments’ responses.
21 projects had discrepancies on more than
(cid:127) Many fields not completed because half of the items we reviewed.
departments may have been burdened by
DOIT’s request for information on 74 items
for projects. We summarize the key items from the survey
responses of the 111 departments in Appendix B.
However, we found that many departments
omitted data from their survey responses,
misinterpreted the instructions, or included errors. We gave
departments an opportunity to review the information they
submitted, and we made any changes they indicated. Nevertheless,
the information we present may still contain inaccuracies.
Because of these inaccuracies, we are skeptical of the
information departments provided to DOIT. DOIT needs to
expend considerable effort to obtain consistent, accurate project
information. In addition, DOIT needs to create a process to
update project information so that data from special project
reports and new feasibility study reports are added to the
existing inventory. DOIT says it plans to have its project
analysts review departments’ survey responses and then work
with departments to capture missing data. DOIT also plans to
allow departments to correct and update their project
information on-line. DOIT indicates its on-line process is
currently in the pilot phase and will not be available to all
departments until it evaluates the pilot process.
57
In its March 2001 Capability Assessment Report to the
Legislature, DOIT indicated that it recently used internally
It is unclear at this time maintained project records to create an inventory of 153 IT
when DOIT will have a projects under development that require its oversight. This
complete and accurate report made public the names of the projects and DOIT’s
project inventory planned level of involvement but did not include key attributes
available for departments of the projects—including project description, technologies
to coordinate their used, complexity, and cost—that are necessary for coordination
efforts. or oversight. Further, although DOIT has provided the names of
153 projects with approved feasibility study reports, this list
represents only a small portion of the more than 2,500
completed and in-development IT projects that departments
reported in DOIT’s survey. Although some of these projects may
not have required DOIT’s approval of their feasibility study
reports, they represent a significant part of the State’s IT
environment and should be considered when making oversight
and coordination decisions. Therefore, it is unclear at this time
when DOIT will have a complete, accurate, and up-to-date
project inventory available for departments to coordinate their
efforts, and for the Legislature and control agencies, including
DOIT, to improve their project oversight.
DOIT HAS NOT FINALIZED SEVERAL KEY STANDARDS
AND PLANS TO DEVELOP OTHERS
State law directs DOIT to develop standards to guide
departments’ IT efforts. DOIT has recently developed several key
standards. Four of five we identified are still in draft form and
the remaining standard is yet to be created. Standards establish
common rules and can encourage the use of best practices for
collecting, sharing, protecting, and storing data, as well as
ensuring the accessibility and usability of systems. By
minimizing the need to modify IT projects that must work
together and reducing the risk of unauthorized access, among
other benefits, standards can decrease operating costs. Despite
the value of these standards and the fact that from its beginning
DOIT has been required to oversee the development of IT
standards, DOIT has not finalized standards in several critical
areas. Departments’ records show that since DOIT’s inception in
1996, the State has completed or begun development of about
200 major IT projects—those with development costs greater
than $1 million. By not finalizing the standards, DOIT may
have missed opportunities to ensure that departments develop
IT systems in a consistent and coordinated fashion.
58
DOIT states that the standards it has developed to date have
mostly been directed toward the eGovernment initiative. As part
of the eGovernment initiative, senior IT staff from various
departments, with DOIT’s assistance, were to develop five key
standards—security, infrastructure, application development,
accessibility, and data. However, as Table 2 shows, one standard
has not been developed and the others are still in draft form.
TABLE 2
Key Standards Not Completed
Status of Standard
Standard Benefit According to DOIT
Security Protect state IT projects and information Final draft created
from damage or unauthorized disclosure
or use. Ensure the privacy of information.
Infrastructure Ensure that state IT projects meet the Final draft created
availability requirements of their users.
Establish a statewide level of service.
Facilitate the efficient operation and
maintenance of projects.
Application Promote the usability of projects, including Preliminary draft
Development the use of skilled personnel and proper created
infrastructure.
Accessibility Ensure that individuals with disabilities can Preliminary draft
access systems. created
Data Facilitate the sharing of data among Not drafted
projects without translating, editing,
or reformatting.
Although DOIT currently indicates that security and
infrastructure standards are final drafts, it does not expect these
standards to be through the review and approval process until
October 2001. DOIT does not plan to finalize these standards
until then because it believes that standards development
requires an extensive process to obtain the input and buy-in of
the affected entities. Because the application development and
accessibility standards are in preliminary draft form and the data
standard is not yet drafted, it is unclear when DOIT will issue
these standards. DOIT plans to issue other standards in the
future, including standards for software licensing and asset
management, e-mail, office automation, and document
exchange. Until standards are finalized, departments will
continue to conceive and develop IT projects without the
framework needed to ensure that their efforts meet common
rules and are consistent with best practices.
59
DOIT HAS INCONSISTENTLY USED ITS ADVISORY
COUNCILS
DOIT has not consistently used the two IT advisory councils
required by state law to address strategic IT policies and
management issues. One required council—the private
commission—should consist of IT practitioners from private,
academic, nonprofit, and governmental sectors and is intended
to provide advice on long-term trends and strategies, key
policies, emerging technologies, and best practices. The second
required council—the public committee—should consist of
representatives from state agencies and is intended to advise
DOIT on successful IT management, identify critical success
factors, and recommend policy changes. DOIT’s annual reports
from 1996 to 1998 indicated that both councils met on a regular
basis and that subcommittees of the councils were studying
various issues and producing reports. During 1999 a form of
both councils met to help the State with the year 2000 effort.
It is unclear if DOIT regularly met with the private commission
in 2000, but DOIT has more recently begun meeting with it
regularly to discuss pressing issues. Although DOIT’s last official
meeting with the version of the private commission that had
addressed the year 2000 effort was in January 2000, DOIT claims
that it continued to meet with certain private industry and local
After meeting with the government representatives during 2000. However, it is unclear
private advisory whether unofficial meetings with these representatives
commission in constitute the statutorily required private commission. In
January 2000, DOIT did addition, DOIT was unable to provide evidence that it ensured it
not officially meet with was receiving the advice envisioned in state law, including long-
the commission again term IT trends and strategies. During this time, DOIT was
until January 2001. attempting to change its feasibility study report process and
reorganize its operations and would have benefited from the
commission’s insights. DOIT did not officially meet again with the
private commission until January 2001, which was when DOIT
first met with the current version of the commission known as the
California Information Technology Commission. DOIT
subsequently scheduled monthly meetings for the rest of the year.
The commission’s first few meetings this year included discussions
on a draft of software piracy policy, recruitment and retention of
skilled IT staff, and best practices to meet energy challenges.
DOIT uses a council composed of department CIOs to meet the
intent of the law for a public committee. In February 2000 DOIT
established a CIO Advisory Council comprised of the CIOs that
chair 13 DOIT-sponsored work groups. DOIT formed the work
60
groups to develop policies and address a variety of topics,
including strategic planning, acquisition, and approval of
feasibility study reports. Although DOIT indicates that the CIO
Advisory Council was put on hold until October 2000 so its
DOIT could not provide members could focus on the eGovernment initiative, DOIT
us any written findings or appears to have met regularly with the council since then.
recommendations from However, because DOIT did not sufficiently document its
the CIO Advisory meetings with the council, we could not determine if DOIT
Council—the group ensured that the council provided it with the advice intended by
created to serve as a law. In addition, DOIT could not show us any written findings
public committee. or recommendations made by the council, even though state
law indicates they must be made available to interested parties.
Consequently, interested parties, including the public and the
Legislature, are unable to readily evaluate the direction that the
council provides DOIT. Further, many of the 13 CIO work
groups are too new to determine if they will reach the goals
established for them. Although DOIT created the work groups
early in 2000, they were initially used to assist in the State’s
eGovernment efforts to produce draft standards and other
related duties. It was not until later in 2000 that DOIT was able
to direct these work groups to other purposes, such as recruiting
and retaining skilled IT staff and redesigning the feasibility study
report. According to DOIT, only 5 work groups had met before
February 2001 but all 13 had met as of May 2001.
In addition to the CIO Advisory Council and work groups, DOIT
has created other opportunities to receive feedback from CIOs and
communicate its message to them. DOIT typically sponsors
biweekly meetings with department CIOs to present IT
information, such as changes in the feasibility study report
approval process, the implementation of the State’s new Web
site, and more recently, the State’s efforts to conserve energy.
DOIT has also co-sponsored other forums that have included
presentations on best practices, how government can provide
services over the Internet, privacy and computer security, and
using geographic information systems.
DOIT acknowledges that pressing concerns with the year 2000
effort and the eGovernment initiative dominated the use of the
councils over the past two years. However, DOIT has now
directed the councils to provide advice on how DOIT should
carry out its statutory responsibilities. It appears that DOIT has
started to receive the input from private- and public-sector
leaders on its other IT efforts, although it is too early to tell
whether the councils’ activities provide the advice envisioned by
61
state law. The councils’ input may help DOIT address the weak-
nesses in strategic planning, project review and approval, and
project oversight discussed in Chapter 1 of this report.
DOIT’S LACK OF PROGRESS ON ITS RESPONSIBILITIES
COULD LESSEN ITS CREDIBILITY
Although DOIT has made progress on some past initiatives,
DOIT’s lack of progress on other initiatives and legislative
requests could lessen its credibility with departments and the
Legislature. Since its inception DOIT has pledged action on key
initiatives or planned tasks in its annual reports to the
Legislature. However, as shown in Table 3, DOIT has not
fulfilled all its promises. For example, DOIT indicated in its
1998 annual report that it would enable departments to update
the statewide project inventory over the Internet, but this
capability still does not exist. DOIT states that the initiatives
presented in Table 3 were established by the previous
administration. DOIT believes that the current administration
cannot be held accountable for the promises and initiatives of
that administration. Nevertheless, DOIT’s lack of progress may
lessen its credibility.
DOIT has made progress on certain initiatives. For example,
DOIT is required to promote reforms in IT classifications so that
the State can better reward skilled workers and facilitate the
State’s ability to succeed in the changing IT environment. Over
the past year DOIT has worked with other departments and a
CIO work group to change the minimum qualifications for some
IT positions to allow for a broader pool of qualified applicants.
In addition, DOIT is redesigning its process for approving
feasibility study reports and has recently begun a pilot of the
new process.
The Legislature has had
to make special requests Nevertheless, as discussed throughout this report, DOIT has
of DOIT to develop addressed some but not all responsibilities the Legislature has
policies in many areas given it. Some of the responsibilities it has not sufficiently
such as project addressed include properly overseeing departments’ IT efforts,
management, creating standards, and developing and maintaining a project
procurement, project inventory. In addition, the Legislature has had to make
sizing, and feasibility special requests of DOIT to issue policies on project
study reports. management training, procurement, project sizing, project
delegations, and streamlining the feasibility study report
process, among other topics. Because it has not complied with
legislative requests and requirements, DOIT could lose credibility
62
TABLE 3
Selected DOIT Initiatives That Have Not Been Completed
Initiative Status
Develop statewide Although DOIT indicated in its 1996 annual report that it
IT systems would identify departments that would participate in
potential statewide pilots, DOIT could not demonstrate
that it evaluated these pilots to determine if statewide
projects are warranted.
Create security Although DOIT indicated in its 1997 annual report that it
standards would publish general standards for the IT security
requirements for new projects, security standards are still
in draft form.
Improve the State’s Although DOIT indicated in its 1997 annual report that it
ability to efficiently would improve the ability to readily locate the e-mail
use e-mail addresses of state employees, DOIT states that the
Department of General Services has taken responsibility for
this initiative and has implemented an on-line directory.
However, DOIT indicates it is still a work in progress.
Create an on-line project Although DOIT indicated in its 1998 annual report that it
tracking database planned to expand its project tracking system so that
departments could submit their projects over the Internet,
DOIT has not developed that capability but plans to use it
as part of its new process for overseeing departments’
development efforts.
Improve project Although DOIT indicated in its 1998 annual report that it
risk assessment would incorporate the results of a department survey into
its risk assessment model, DOIT states that due to staff
turnover, it is unable to locate the survey that would guide
those changes and therefore cannot show how it
incorporated the results.
with departments and the Legislature. For instance, some CIOs
with whom we met expressed concerns because DOIT has not
fulfilled its responsibility of issuing standards to help
departments improve communication and coordination
between IT systems, and some CIOs questioned the value of
DOIT’s project oversight because it did not provide feedback on
project reports.
DOIT NEEDS TO IMPROVE ITS INTERNAL
PLANNING PROCESSES
Although good management practices suggest that DOIT
develop and implement an internal strategic plan to guide its
efforts and maximize the efficient use of its resources, it has not
consistently used one. DOIT’s authorizing legislation requires it
to be involved in a variety of activities, and meeting these
responsibilities stretches its resources. In addition to its oversight
63
of IT projects, DOIT is required to issue policies and standards,
organize advisory councils, and coordinate the State’s IT
activities. Yet, DOIT has operated without the direction of an
internal strategic plan that sufficiently prioritizes its activities,
even though it has faced difficult challenges like the year 2000
effort and staffing problems. In September 1999 DOIT initiated a
planning and realignment effort that produced a high-level
operational plan. However, this plan was simply a list of key
activities DOIT would undertake from July 2000 through
March 2001. Although the list identified numerous short-, mid-,
and long-term activities, it did not differentiate between
activities that must be completed and those that were less
critical. In addition, this list lacked measures for DOIT to
determine if its efforts were effective. Without the direction of
an internal strategic plan to define and prioritize what it needs
to do, DOIT’s efforts have been scattered over a variety of
initiatives, and it has performed inconsistently.
A prime example of DOIT’s need to analyze workload and
prioritize efforts is the challenge presented during the year 2000
effort. Although two executive orders from the governor
established the year 2000 effort as DOIT’s top priority, they did not
relieve DOIT of its responsibility to oversee departments’ IT efforts
or its other statutory duties. In March 1999, in response to the
executive orders, DOIT reduced the staff it assigned to core
responsibilities, such as project approval and oversight, from 15 to
7 and limited its oversight of ongoing projects to large and high-
risk projects. Faced with insufficient resources to focus on the year
2000 effort and still adequately cover its other responsibilities,
DOIT should have requested additional staff for its other
responsibilities. However, according to DOIT, it did not request
additional staff because its main focus at the time was completing
its year 2000 efforts.
DOIT faces another significant challenge in prioritizing its
Because a federal reform efforts in a federally mandated health insurance reform that
that affects how will require changes to the IT systems of various state
departments’ IT projects departments. Over the next couple of years, this reform—the
handle health insurance 1996 Health Insurance Portability and Accountability Act—will
information may require change how these departments collect, process, and report
a significant commitment individuals’ health information. The governor’s budget for fiscal
of its resources, DOIT will year 2001-02 requests $92 million to assist departments in the
need to carefully statewide planning and implementation of the reform. Because
prioritize its efforts. this reform requires significant changes to certain business
processes and their related IT systems, industry experts are
warning that it could be more disruptive than the year 2000
64
effort for the departments that are affected. Although the State
has not yet identified all of them, the number of affected
departments could be significant, possibly including
departments that indirectly handle health care data, such as the
State Teachers’ Retirement System. DOIT has not been asked to
take the lead role; however, this effort may require considerable
commitment of its resources. Unless DOIT carefully plans and
prioritizes its efforts to oversee the changes, DOIT may again be
ineffective in accomplishing its other mandated responsibilities
while focusing on this problem.
DOIT’s ability to identify its strategic priorities
has been hurt by the turnover of key manage-
Turnover of Key Managers During
ment staff. We observed that since July 2000, 8 of
Fiscal Year 2000-01
DOIT’s 11 key managers have left, taking with
(cid:127) Chief deputy
them their experience, knowledge, and insight.
(cid:127) Deputy director of project oversight and These departures have significantly changed
initiation (vacant)*
DOIT’s leadership and depleted the breadth of its
(cid:127) Chief procurement officer
managers’ experience with strategic issues and
(cid:127) General counsel (vacant)* their relationships with departments. DOIT has
(cid:127) Budget officer hired individuals to fill half of these positions,
(cid:127) Personnel officer but several management positions have been
vacant for as long as six months. Since the end of
(cid:127) Legislative affairs coordinator (vacant)*
the year 2000 effort, DOIT has been working to
(cid:127) Public information officer (vacant)*
reorganize its efforts. The turnover in leadership
has been problematic, particularly at a time when
* All vacancies as of May 2001.
DOIT operates without a strategic plan to guide
new managers on how to deal with DOIT’s many
unmet responsibilities.
With high management turnover and no strategic plan, we are
concerned that current DOIT management seems to have not
taken sufficient advantage of the processes established by prior
management. In a recent report to the Legislature, DOIT
indicated that policies and practices in place before the year
2000 effort offered, at best, a starting point for developing
current processes and claimed that relatively few standard
processes and procedures had been developed. Yet before the
year 2000 effort, DOIT made several contributions to the State’s
IT efforts, including issuing a statewide IT plan in 1997 that
contained several initiatives that could continue to guide the
State’s IT efforts. For example, DOIT could update the initiative
related to developing IT standards to describe DOIT’s current
efforts in this area. Further, DOIT had previously published a
detailed policy guide, policy directives, and several studies to
provide guidance and improve the State’s IT management. Thus
65
DOIT’s current leadership appears to have added to its workload
by insisting on revamping the processes and policies developed
by the previous management. It will be difficult for DOIT to
make measurable progress if it is continuously rethinking
policies and practices rather than building on existing practices
when planning future activities.
DOIT acknowledges that it needs a strategic plan to guide its
operations and meet its responsibilities. In October 2000 DOIT
hired a consultant to analyze its internal operations. In
January 2001 the consultant submitted a report to DOIT that,
In January 2001 its among other things, recommended that DOIT rigorously
consultant recommended prioritize its efforts so that it achieves a consistent level of high
that DOIT rigorously performance in its key processes while focusing new efforts on
prioritize its efforts and addressing identified high-risk areas. DOIT established the
focus new efforts on position of director of strategic planning to research internal
identified high-risk areas. and external factors related to its plan, review advice and
recommendations from the private commission, and develop
and document its strategic plan. DOIT expects to complete an
internal strategic plan in November 2001. However, since this
plan has not been completed, it is unclear whether DOIT’s
strategic plan will include elements needed for effective
operations—prioritization of duties and the establishment of
measurable, reasonable goals.
Finally, we are concerned that an organization charged with
such critical responsibilities has not made more progress on its
mission during the more than five years it has existed and has
not adequately prioritized its efforts to address unmet
responsibilities. State law created DOIT in 1996 because a need
existed to facilitate the application of IT in the State. State law
gave DOIT broad authority to coordinate the State’s IT efforts
and oversee most departments’ IT projects. Although DOIT has
faced challenges with the year 2000 effort and staffing issues,
these issues only partially explain DOIT’s inability to fulfill its
statutory responsibilities.
RECOMMENDATIONS
To promote coordination on IT projects and avoid redundant
efforts, DOIT should establish a formal mechanism to initiate
discussions between departments that are developing projects
66
based on similar technologies or processes. To facilitate this
coordination and improve project oversight, DOIT should
complete its IT project inventory based on its survey of depart-
ments. DOIT should ensure that departments’ reported data are
accurate and should update this information when departments
report new information so that the project inventory stays
current. DOIT also needs to consider how departments and the
Legislature can effectively access this information, taking into
consideration privacy issues and other concerns that may limit
the release of this information.
To improve compatibility and properly guide IT development,
DOIT should expedite its work on implementing standards by
determining which standards need to be addressed first and
focusing their efforts accordingly. Further, DOIT should work
with departments to ensure that all necessary standards have
been implemented.
To ensure that DOIT is fully employing the IT advisory councils
and receiving the benefits intended by law, DOIT should
continue to meet with the private commission and the public
committee on a regular basis to guide its strategic planning
efforts, provide input on new policies, and ensure that the State
follows best practices. DOIT should ensure that the public
committee makes all findings and recommendations in writing,
as required by state law. DOIT should also monitor the progress
of its CIO work groups to ensure that they reach their
established goals.
To ensure that it completes initiatives, DOIT should establish
timelines and goals for meeting future initiatives. If DOIT does
not believe it can complete initiatives within established
guidelines, it should communicate its priorities and resource
requirements to the Legislature. In addition, it should notify the
Legislature when changes in the State’s IT environment prompt
adjustments to these priorities or resource requirements.
To organize and focus its efforts, DOIT should adopt an internal
strategic plan to identify key responsibilities and establish
priorities. This plan should clearly describe how the organization
will address its many responsibilities, particularly those that we
observed it has not sufficiently accomplished. Further, it should
build on past efforts to the extent possible rather than reinventing
processes and practices when planning its future activities.
67
We conducted this review under the authority vested in the California State Auditor by
Section 8543 et seq. of the California Government Code and according to generally accepted
government auditing standards. We limited our review to those areas specified in the audit
scope section of this report.
Respectfully submitted,
ELAINE M. HOWLE
State Auditor
Date: June 27, 2001
Staff: Karen L. McKenna, CPA, Audit Principal
John Baier, CPA
Faye Borton
Nathan Checketts, CIA
Jeremy Evans
Arn Gittleman, CPA
Vern Hines
Kumar Sah, CISA
Michelle Tabarracci, CISA
Mike Urso
68
APPENDIX A
Evaluation of Departments’ Project
Management of Selected Information
Technology Projects
I
n Chapter 2 we described our review of four information
technology (IT) projects at different departments to determine
how they used best practices and state requirements in
IT project development. We selected these projects because they
were large, complex, and nearing completion, which allowed us
to evaluate various phases of the project development process. The
following is a more detailed description of each project:
• The Advanced Toll Collection and Accounting System (ATCAS)
is a Department of Transportation (Caltrans) initiative to
replace the existing toll collection and accounting system and
install electronic toll collection on all state-owned toll bridges.
Caltrans believes that the electronic toll collection system will
eliminate the need for participating drivers—whose vehicles
would be equipped with electronic sensors—to stop and pay
at tollbooths. Under the new system, Caltrans would charge
participants’ accounts each time they drive through specially
equipped toll bridge lanes. In 1990 legislation passed requiring
Caltrans to develop specifications and standards for the system
and facilities, and Caltrans began development of ATCAS in
June 1993. Caltrans estimates ATCAS will be completed in
December 2001.
(cid:127) The Tax Engineering and Modernization (TEAM) project,
developed by the Employment Development Department, was
chartered to reengineer and streamline employers’ tax returns
and related payment processes, reduce or eliminate the flow
of paper documents, improve efficiency in processing tax
documents, increase electronic filing options, reduce costs,
and improve responsiveness to customers. The Employment
Development Department intended TEAM to eliminate the
need for about 350 positions. To provide an incentive to the
vendor to reach this goal, the payment to the vendor was
based on the savings achieved. TEAM began in June 1997 and
was completed in April 2001.
69
(cid:127) The Children’s Medical Services Network Enhancement 47
(CMS Net E47) is a Department of Health Services (Health
Services) project to enhance the existing Children’s Medical
Services Network––a case management system for two programs
that serve children from low-income families unable to afford
specialized medical care and individuals who have certain
genetic diseases. The enhancement will link the existing
system to the State’s medical and dental fiscal intermediaries.
The project is intended to implement electronic billing and
create a statewide patient, service authorization, and claims
review database. CMS Net E47 began in January 1998, and
Health Services expects to complete it in December 2002;
however, elements of the project related to case management
and eligibility for Medi-Cal and Healthy Families were imple-
mented in April 2001. Currently, 46 counties use these elements.
(cid:127) The Accounts Receivable Collection System (ARCS) was
developed to expand the benefits that the Franchise Tax Board
had obtained from its collection system for banks and corpo-
rations. That collection system created modeling techniques
to prioritize tax accounts with the greatest potential for
revenue collection. ARCS was designed to unify the Franchise
Tax Board’s collection efforts for all tax programs, consolidating
debtor accounts, creating an enterprisewide bankruptcy and
lien system, and coordinating a consistent collection approach.
ARCS began in April 1998 and was completed in March 2001.
Each of the four projects had cost increases and schedule overruns,
as shown in Table 4. The most notable of these cost overruns
occurred with the ATCAS and CMS Net E47 projects. In addition,
ATCAS is significantly behind the originally scheduled completion
date. The other two projects were better managed and had less
significant cost increases and delays. The original and current costs
for each project shown in Table 4 are for one-time development
costs and do not include continuing costs for operations.
70
TABLE 4
Cost Overruns and Delays in Four IT Projects We Reviewed
(Dollars in Millions)
Employment
Development Health Franchise
Caltrans Department Services Tax Board
Project ATCAS TEAM CMS Net E47 ARCS
Original cost estimate ($) 27.8* 67.7 5.6 33.0
Current cost estimate ($) 56.1 71.7 10.2 36.3
Increase in cost ($) 28.3 4 4.6 3.3
Increase in cost (%) 102 6 82 10
Start date June 1993 June 1997 January 1998 April 1998
Original completion date January 1997 June 1999 September 2001 June 2000
Revised completion date December 2001 April 2001 December 2002 March 2001
Original development time (months) 44 25 45 27
Revised development time (months) 103 47 60 36
Expected delay (months) 59 22 15 9
* This amount is from the 1995 feasibility study report and, according to Caltrans, excludes $1.8 million for spare parts, and an
unknown cost for Caltrans staff working on the project. Had Caltrans included the additional known costs of $1.8 million in the
feasibility study report, the original cost estimate would have been $29.6 million, and the increase in cost would have been
$26.5 million, or 90 percent.
Table 5 shows in detail how we rated, from strong to weak, each of
the four departments for their use of best practices in IT project
development. After assigning a rating to each individual factor,
we assigned an overall rating for each of the three phases:
planning and procurement; design, development, and imple-
mentation; and quality assurance.
71
TABLE 5
Evaluation of Four IT Projects
Employment
Development Health Franchise
Caltrans Department Services Tax Board
Best Practices (ATCAS) (TEAM) (CMS Net E47) (ARCS)
Planning and Procurement
Define a problem statement and supportable business case W S A S
Outline the business problem and allow the vendor to propose a solution W S W A
Clearly define and document the scope of the project W A A A
Clearly define and document the use of project management methodology W I A A
Sponsor the project through appropriate commitment and involvement of A A W A
management, and include sufficient resources
Base procurement on best value, not lowest cost A A W A
Use a vendor that provides and maintains sufficient qualified staff I I W A
Require a letter of credit from the vendor on a large project A NR W NR
Clearly define and document the risk management plan W I I A
Write a strong contract to adequately protect the State A S W A
Enforce the terms of the contract W A NA A
Overall Weak Acceptable Weak Acceptable
Design, Development, and Implementation
Design, develop, and test the project appropriately according to specifications I A A A
Establish measurable objectives for the project W A S A
Prioritize project elements, such as budget, schedule, and functionality, up front A A A A
Develop smaller projects with milestones W A A A
Use sound project management practices during implementation W A I A
Establish appropriate policies and procedures to manage and control changes A I I A
to the developing project
Develop an adequate information security system to detect and prevent A W W A
inappropriate access
Overall Weak Acceptable Acceptable Acceptable
Quality Assurance
Create an effective quality assurance mechanism and use it during each W S I A
phase of development
Heed the advice of the oversight consultant or explain why it is not applicable NA A A A
Pay the vendor only after accepting tested project deliverables A A W A
Overall Weak Acceptable Inconsistent Acceptable
S — Strong The department successfully demonstrated that it met the minimum requirements. Further, the department
demonstrated additional controls or processes that exceed the minimum standards.
A — Acceptable The department successfully demonstrated that it met the minimum requirements. The department may
have encountered some minor problems during the IT project, but these problems did not cause significant
cost or schedule overruns.
I — Inconsistent Initially, the department did not successfully demonstrate that it met the minimum requirements. However,
during the course of the IT project, the department took steps to meet the minimum requirements.
W — Weak The department did not successfully demonstrate that it met the minimum requirements. The department’s
failure to do so likely created significant problems related to the cost, schedule, or functionality of the IT project.
NR — Not required These projects are benefit or performance based. Consequently, the State pays the vendor only when benefits
are realized, and a letter of credit is not required.
NA— Not applicable We could not evaluate the best practice. Health Services did not write a contract to adequately protect the State,
and Caltrans did not have an oversight consultant.
72
APPENDIX B
Major Completed and In-Development
Information Technology Projects
A
s discussed in the Scope and Methodology, we were asked
to create an inventory of the State’s major information
technology (IT) projects as part of this audit. We based
our project inventory on information we collected from the
Department of Information Technology’s (DOIT) IT project survey
of 111 state organizations. DOIT selected these departments,
boards, and commissions because it was aware of IT projects at
these organizations. DOIT indicates that it plans to invite orga-
nizations excluded from this survey to participate in subsequent
surveys. DOIT also excluded the State’s public universities and
colleges from the survey because those entities are not required
to report to it. For purposes of this report, we refer to state
organizations in our project inventory as departments.
Because many departments that DOIT surveyed initially submit-
ted incomplete responses, we engaged in several rounds of
follow-up contacts to fill in missing information or clarify unclear
terms in the project titles. As a result of these follow-up efforts,
we received sufficient information to complete Tables 6 through 8.
Yet, as discussed in Chapter 3, our follow-up and our review of
five departments’ documentation of 23 projects identified
weaknesses in the way departments reported their information.
Considering these problems, the information in these tables
may contain errors, be incomplete, or be reported in a manner
that is inconsistent with other departments. However, we offered
all departments the opportunity to review their information,
and we made any changes they indicated.
Table 6 shows completed IT projects (ongoing systems) with
one-time development costs greater than $1 million, listed by
department. In Table 7 we give information on IT projects with
one-time development costs greater than $1 million that depart-
ments are currently developing. DOIT’s survey asked departments
to report project information, including the percentage of the
project that was complete, as of November 2000. However, some
departments updated their project information during our
follow-up. Departments that had no major projects in either
category are listed at the end of both tables.
73
Table 8 summarizes each department’s reported IT activities. We
separated reported projects into five groups: three for completed
projects (greater than $1 million, less than $1 million, or no
reported costs) and two for projects in development (greater
than $1 million and less than $1 million). We also give the total
number of completed and in-development projects reported by
each department.
74
TABLE 6
Completed Projects With Development Costs Greater Than $1 Million
(Dollars in Millions)
Projects Listed Year Development Maintenance Costs
Child Support Services, Department of
Pre Statewide Interim Case management 1997 $23.3 †
Systems Management (PRISM)
Consumer Affairs, Department of
DCA Field Office LAN’s Licensing 1997 2.6 $ 0.5
Contractors’ State Licensing Board Licensing 1991 2.0 0.2
License Applications/Cashiering System
Consumer Affairs System (CAS) Licensing 1986 1.8 1.1
Licensing Module
Family Support Enforcement Project Law enforcement 1996 1.8 0.3
CAS Family Support Module
CAS Enforcement Module Licensing 1992 1.4 1.1
Contractors’ State Licensing Board Licensing 1991 1.3 0.2
License System (Phase I)
Corrections, Department of
Interim Parolee Tracking Law enforcement 1998 29.3 4.2
Standard Automated Preventive Workload 2000 10.0 0.2
Maintenance System
Automated Canteen Sales Financial 1996 1.8 0.4
and Inventory
Inmate Trust Accounting General accounting 1989 1.0 0.7
Developmental Services, Department of
Doctors Orders and Hospital information system 1998 10.8 0.2
Communication (DOCS)
Cost Recovery Financial 1991 5.8 0.8
Hospital Client Support Hospital information system 1989 2.8 0.9
System (HCSS)
Employment Development Department
New Employee Register Child support 1998 26.2 21.7
Job Training Automation Enhancement 1997 6.7 0.1
Compliance Automation Workflow, case management 1999 5.2 1.6
Workstations (CAW)
Assembly Bill 3086 Workflow 1999 2.1 1.2
Unemployment Insurance (UI) Benefit claims 2000 1.4 0.2
Continued Claim
Y2K System Replacement
*A list of departments that reported no completed projects with development costs greater than $1 million begins on page 81.
† The cell was left blank in the survey or the response was incomplete.
Continued
75
Projects Listed Year Development Maintenance Costs
by Department Description Implemented Costs Fiscal Year 1999–2000
Equalization, Board of
Migration to Teale Data Center‡ Financial 1999 $ 24.0 $11.0
Automate Compliance Management Case management, financial 1997 10.6 1.2
System (ACMS)
Fish and Game, Department of
Geographic Information Systems Geographic information systems 1999 8.5 1.0
Franchise Tax Board
Business Entities Tax Revenue management 1997 42.0 0.2
Pass-Through-Entity Automated Case management 1998 34.8 8.6
Screening & Support (PASS)
Taxpayer Information (TI) Revenue management 1993 32.7 0.0
Collections Account Processing Collections 1996 7.3 0.3
Employment Information Database Revenue management 1997 3.6 0.1
Enterprise Wide Customer Telecommunication 1999 3.0 0.4
Service Platform
Mainframe Capacity Augmentation Audit, filing, public service, 1999 2.3 0.1
collections
Limited Liability Companies (LLC) General accounting, audit, 2000 1.9 2.4
financial, collections, filing
Imaging Revenue management 1994 1.8 0.1
Collections, DMV Collections 1995 1.4 0.0
Enterprise Duplex Printing System Collections, audit 2001 1.3 §
Direct Filing Portal Revenue management, 2001 1.2 §
tax assessment
Un-interruptible Power Source Audit, collections 2001 1.2 §
(UPS) Replacement
Electronic Filing Revenue management 1995 1.1 0.0
General Services, Department of
Procurement Division (PD) Procurement 1994 4.9 0.2
Information Network
Office of Fiscal Services (OFS) Financial, human resources 1998 4.0 0.0
Activity-Based Management
System (ABMS)
Executive Branch (EB) Workflow, workload 2000 1.1 §
E-Mail System management
Health and Human Services Agency Data Center
Child Welfare System/Case Case management 1998 119.5 53.8
Management System (CWS/CMS)
Statewide Automated Welfare System – Case management, financial, 1998 114.7 21.5
Interim Statewide Automated Welfare workload management,
System (SAWS – ISAWS) Consortium eligibility determination
‡ Migration to Teale Data Center includes the following projects: Integrated Revenue Information System (IRIS), Aircraft/Vessels (ATAV),
Board Roll, Consumer Use Tax FAA Information File (ATAI), Homeowners, Legal Entity Ownership Program (LEOP), Private Railroad Car,
Timber Tax, Special Taxes Automated Revenue System (STARS), Excise Tax Beer Vendors (ETBV), Excise Tax Importers (ETIM), Excise Tax
Purchase & Sales (ETPS), Cigarette Tax Stamp Orders (CTSO), and Cigarette Tax Stamp Tracking (CTST).
§ The project was completed after fiscal year 1999-2000. Continued
76
Projects Listed Year Development Maintenance Costs
by Department Description Implemented Costs Fiscal Year 1999–2000
Health Services, Department of
Medi-Cal Management Information Data warehousing, 2000 $43.9 $7.6
System/Decision Support System management information
system decision support
California Medicaid Management Health care 1980 23.5 15.0
Information System (CA–MMIS)
Women, Infants, and Children/ Case management, financial 1997 18.5 19.0
Integrated Stateline Information services, reporting architectures,
System (WIC/ISIS) on-line purchase, tracking
Medi–Cal Eligibility Data System (MEDS) Health care administration 1984 14.0 25.3
Denti–Cal Claims processing 1986 4.5 0.5
Exchange E–mail System E-mail messaging system 1999 3.0 1.7
Desktop Assessment Project Ongoing inventory 1999 1.7 0.2
Highway Patrol, California Department of
Computer Aided Dispatch System (CAD) Law enforcement 1999 13.1 2.3
Housing and Community Development,
Department of
Codes and Standards Automated Office automation, document 2000 11.2 4.0
System Re-engineering Project tracking, licensing, registration
and titling, financial, law
enforcement, title search, workflow
Insurance, Department of
Integrated Data Base (IDB) Registration and titling 1999 8.6 1.5
Justice, Department of ll
Cal–ID Equipment Replacement Law enforcement, automated 2000 42.5 1.2
fingerprint identification
system (AFIS)
Information Technology Needs Law enforcement 2000 14.3 1.2
Statewide Integrated Narcotic Law enforcement, 1997 14.1 2.5
System (SINS) telecommunication,
case management
California Law Enforcement Law enforcement, 1999 10.7 2.5
Telecommunications System telecommunication
(CLETS) Replacement
Applicant Live Scan Fingerprint 1998 10.4 1.6
National Criminal History Fingerprint, criminal history 1999 8.0 0.0
Improvement Program (NCHIP)
Year 1&2
Statewide Alcohol Information Telecommunication, 1999 6.8 0.4
Network (SAIN) law enforcement,
case management
CLETS Hardware Replacement Law enforcement, 2000 6.3 0.0
telecommunication
NCHIP Year 3 Fingerprint, criminal history 2000 4.3 0.0
NCHIP Year 4 Fingerprint, criminal history 2000 3.8 0.0
ll The department only reported projects completed since 1997.
Continued
77
Projects Listed Year Development Maintenance Costs
by Department Description Implemented Costs Fiscal Year 1999–2000
Justice, Department of (continued)ll
Southwest Border States Anti–Drug Law enforcement 1999 $ 3.1 $0.9
Information System Integration
Juvenile Accountability Incentive Fingerprint 2000 3.0 0.0
Block Grant (JAIBG)
Violent Crime Information Network Law enforcement, 2000 2.4 0.6
(VCIN)/Megan’s Law CD Distribution automated fingerprint
Change (AB 2799) identification system (AFIS),
telecommunication
Consolidated Firearms Information Law enforcement, workflow 1999 1.9 2.0
System (CFIS)
Expansion of Cal-DNA/CODIS Law enforcement 2000 1.4 0.0
Live Scan Augmentation Fingerprint 2000 1.4 0.0
Automated Cartridge System (ACS) Computer operations 1997 1.3 0.2
Cal–Gang Law enforcement 1999 1.2 0.3
Implementation of AB 1659 Law enforcement, automated 2000 1.1 0.0
fingerprint identification
system (AFIS)
Lottery Commission, California State
On–line Games Processing System Lottery product sales 1993 70.0 30.0
Scratch Ticket Processing System Lottery product sales 1997 29.0 30.0
Epicore Automated Financial Financial 1999 3.0 0.5
Accounting System
Lottery Retailer Master File Lottery product sales 1993 1.4 0.1
Military Department-Office of the
Adjutant General
Wide Area and Local Area Network 2000 4.5 §
Networks (WAN/LAN)
Motor Vehicles, Department of
Driver Safety Program Postlicensing control 1996 126.3 0.0
Automation Project
Applying Technology to Financial, vehicle 1998 11.9 0.0
Remittance Processing registration, titling
Field Office Printer Replacement Infrastructure 1999 4.8 0.0
Occupational Licensing Licensing 1999 3.7 0.0
System Redesign
Smog Impact Fee Refund One-time $300 SMOG 2000 1.8 0.1
impact fee refund
Motor Carrier Permit (MCP) System Registration 1998 1.6 0.1
Network Component Replacement Infrastructure 1999 1.6 0.0
Telephone Systems Upgrade/ Telecommunication 1999 1.4 0.2
Staffing Augmentation
Telephone Service Center Licensing, vehicle registration 2000 1.3 0.0
Upgrade (Pilot) and titling, telecommunication
llThe department only reported projects completed since 1997.
§The project was completed after fiscal year 1999-2000. Continued
78
Projects Listed Year Development Maintenance Costs
by Department Description Implemented Costs Fiscal Year 1999–2000
Motor Vehicles, Department of (continued)
Vehicle Registration Internet Vehicle registration renewal 2000 $ 1.2 $0.0
Renewal System
Public Employees’ Retirement System
CalPERS Online Member & Employer Health benefit data support 1998 13.2 0.9
Transaction System (COMET) System
COMET Employer and Participant Demographics, employment and 2001 13.1 §
retirement information data base
Investment Accounting Portfolio management 2000 5.3 0.8
and Reconciliation reconciliation
Actuary and Employers Division (AESD) Actuarial valuation system 1996 3.5 0.2
PeopleSoft Financials Accounting 1999 3.2 0.9
Automated Communication Exchange Web application, 2000 2.8 §
System (ACES) electronic transactions, inquiry
COMET Transmission Log (T-Log) Batch process 2001 1.5 §
Public Utilities Commission
Office Automation 2000 Workload management 1998 2.1 0.4
Transportation Management Licensing 1988 1.2 0.3
Information System (TMIS)
Rehabilitation, Department of
Field Computer System (FCS) Vocational Case management 1990 1.0 0.3
Rehabilitation Case Management System
Secretary of State
Limited Partnership/ Document tracking 1984 8.5** †
Limited Liability Companies
Uniform Commercial Code Filings Document tracking 1995 4.0 0.0
Online Status System
CalVoter I: Elections-Voter Elections enforcement 1999 3.5 7.3
Registration Database
Calvoter II: Elections Elections 2000 2.9 0.3
Cal-Access: Political Reform – Document tracking 2000 2.4 1.1
Campaign Filings and Political
Reform – Lobbyist Filings
Management Services – Fiscal: Financial 1999 1.4 2.1
Financial Information Resource
Management System (FIRMS)
Social Services, Department of
Field Automation System Application expansion 1997 1.3 0.0
(FAS) - Residential
Student Aid Commission, California
Grant Delivery System Financial 2000 4.7 0.5
Teachers’ Retirement System, State
STRS Enterprise Database Case management 1985 6.1 1.5
§The project was completed after fiscal year 1999-2000.
** The department reported total costs for this project because it could not readily separate development costs from other costs.
† The cell was left blank in the survey or the response was incomplete. Continued
79
Projects Listed Year Development Maintenance Costs
by Department Description Implemented Costs Fiscal Year 1999–2000
Transportation, Department of
District 07 Automated Transportation Traffic operations 2000 $6.8 $1.2
Management System
(ATMS) Version II
Toll Registration and Audit Toll bridge operations 1989 5.0 0.5
Collection System (TRAC)
District 00 Transportation Systems Highway inventory 1998 4.3 0.4
Network and Inventory
District 00 Transportation Accounting Financial 1984 4.1 2.5
Management System (TRAMS)
District 11 Ramp Meter Traffic management, 1972 4.0 0.5
congestion management
District 00 Expert Project Project management 1997 3.3 0.1
Manager (XPM)
District 11 Reversible Lanes Traffic management, 1988 3.0 0.7
congestion management
District 00 Intermodal Transportation Transportation planning 1998 2.8 0.1
Management System (ITMS)
District 00 Current Billing Financial 1991 2.3 1.6
and Reporting (CBARS)
District 00 Caltrans Financial 1995 2.3 0.7
Accounts Payable (CAPS)
District 00 Highway Accident Database Planning 1998 2.1 0.2
District 04 Toll Bridge Accounting (TBA) Financial 1986 2.0 0.3
District 04 Toll Registration and Audit Financial 1986 2.0 0.2
Collection (TRAC)/SAIC Programs
for Bay Bridge
District 00 Time Reporting (TRS) Human resources 1993 1.8 1.4
District 00 California Contract management 1993 1.8 0.7
Certification System
District 00 Traffic Volumes (TV) Inventory 1998 1.8 0.3
District 00 Right of Way Rentals (RWR) Financial 1998 1.6 0.4
District 00 Right of Way Property Project management 1992 1.6 0.3
Management (RWPM)
District 00 Pavement Highway inventory 1998 1.4 0.3
Management System
District 59 Bridge Inspection Engineering archive 1993 1.2 0.2
Reporting System
District 00 Federal Aid Data Financial 1994 1.1 0.6
System (FADS)
District 00 Highway Inventory 1997 1.1 0.2
Performance Monitoring
District 04 Toll Bridge Financial 1986 1.0 0.1
Reconciliation (TBR)
Treasurer, State
Item Processing - Replacement Financial 1999 4.3 0.2
Continued
80
Projects Listed Year Development Maintenance Costs
by Department Description Implemented Costs Fiscal Year 1999–2000
Veterans Affairs, Department of
Farm & Home Loan System (CalVet) Complete mortgage banking 1999 $ 1.7 $0.1
Veterans Home Information Complete health care system 1998 1.5 0.1
System – Barstow
Water Resources Control Board, State
Water Rights Information Support water rights program 1999 2.3 0.4
Management System (WRIMS)
Water Resources, Department of
SAP-1 Enterprise Resource Planning Enterprise resource planning 1999 17.4 4.9#
System Implementation/
(Business 2000 Phase 1)
SAP-2 Enterprise Resources Planning Enterprise resource planning 2000 13.2 0.0
System Implementation/
(Business 2000 Phase 2a)
SAP-CARA (Cost Allocation State water project
and Repayment System) billing system 2000 5.4 #
The following departments reported no completed projects with development costs greater than $1 million:
Administrative Law, Office of Conservation, Department of
African American Museum Controller, State
Aging, Department of Corporations, Department of
Agricultural Labor Relations Board Corrections, Board of
Air Resources Board Criminal Justice Planning, Office of
Alcohol and Drug Programs, Department of Education, Department of
Alcoholic Beverage Control, Department of Education, Office of the Secretary for
Arts Council, California Education, State Board of
Boating and Waterways, Department of Emergency Medical Services Authority
Building Standards Commission, California Emergency Services, Office of
Business, Transportation and Housing Agency Employment Training Panel
California Victim Compensation and Government Claims Energy Resources, Conservation and Development
Board (formerly the State Board of Control) Commission
Coastal Commission, California Environmental Health Hazard Assessment, Office of
Coastal Conservancy, State Environmental Protection Agency, California
Colorado River Board of California Exposition and State Fair, California
Community Colleges, Board of Governors Fair Employment and Housing, Department of
Community Services and Development, Department of Fair Political Practices Commission
Conservation Corps, California Finance, Department of
#The $4.9 million is for both the SAP-1 and the SAP-CARA programs. Continued
81
The following departments reported no completed projects with development costs greater than $1 million:
Financial Institutions, Department of Pesticide Regulation, Department of
Food and Agriculture, Department of Postsecondary Education Commission, California
Forestry and Fire Protection, Department of Prison Terms, Board of
Health and Human Services Agency, California Public Employment Relations Board
Health Planning and Development, Office of Statewide Real Estate Appraisers, Office of
Horse Racing Board, California Real Estate, Department of
Housing Finance Agency, California Resources Agency
Industrial Relations, Department of San Francisco Bay Conservation and Development
Commission
Inspector General, Office of the
Santa Monica Mountains Conservancy
Insurance Advisor, Office of
Science Center, California
Integrated Waste Management Board, California
State and Consumer Services Agency
Law Revision Commission, California
State Lands Commission
Library, California State
Stephen P. Teale Data Center
Managed Health Care, Department of
Tahoe Conservancy, California
Managed Risk Medical Insurance Board
Teacher Credentialing, Commission on
Mandates, Commission on State
Technology, Trade and Commerce Agency, California
Medical Assistance Commission, California
Toxic Substances Control, Department of
Mental Health, Department of
Traffic Safety, Office of
Narcotic Addict Evaluation Authority
Unemployment Insurance Appeals Board, California
Parks and Recreation, Department of
Youth and Adult Correctional Agency
Peace Officer Standards and Training, Commission on
Youth Authority, Department of the
Personnel Administration, Department of
Youthful Offender Parole Board
Personnel Board, State
82
83
TABLE 7
Projects in Development With Estimated Costs Greater Than $1 Million
(Dollars in Millions)
Original Revised Original Current
Projected Projected Projected Projected Original Current
Projects Listed Original Actual Completion Completion Percent One-Time One-TimeProjected Projected
by Department* Description Start Date Start Date Date Date Complete Cost Cost Savings Savings
California Victim Compensation and
Government Claims Board
(formerly the State Board of Control)
Restitution Track System (10% Rebate) Case management Sep–99 Sep–99 Dec–00 Feb–01 95% $1.2 $ 0.7 $1.6 $0.5
Conservation, Department of
Division of Recycling Integrated Information Integrated recycling Jul–99 Mar–01 Jun–03 Mar–04 1 8.5 8.5 1.7 1.7
System (DORIIS) information
Controller, State
Automated Travel Expense Automated Jul–00 Jul–00 Jul–02 Jul–02 50 4.0 4.0 28.5 28.5
Reimbursement System travel expense
reimbursement system
Corrections, Department of
Cable Plant Telephone System Telecommunication Apr–00 Apr–00 Jun–03 Jun–03 4 22.4 22.4 0.0 0.0
Parole Law Enforcement Automated Law enforcement Jul–97 Jul–97 Nov–98 Jun–01 80 3.7 6.0 0.0 0.0
Data System (LEADS) Phase II
Enhanced Peace Officer Training Training Mar–00 Jul–00 Jun–02 Jun–02 80 1.3 1.3 0.0 0.0
Revocation Scheduling and Tracking System Law enforcement Jul–98 Jan–99 Jun–99 May–01 70 0.8 1.8 0.3 -1.3
Developmental Services, Department of
California Developmental Disabilities Case management, Jul–00 Jul–00 Jun–03 Jun–05 10 9.9 9.9 0.0 0.0
Information System (CADDIS) contract management,
financial, general
accounting
Health Insurance Portability and Case management, Jul–00 Sep–00 Jun–05 Jun–05 1 2.6 2.6 0.0 0.0
Accountability Act contract management
Education, Department of
Principal Apportionment System Financial Feb–97 Apr–98 Jun–01 Jun–02 31 3.6 4.4 0.0 0.0
Rewrite (PASR)
* A list of departments that reported no projects in development with estimated costs greater than $1 million is on page 91.
Continued
84
Original Revised Original Current
Projected Projected Projected Projected Original Current
Projects Listed Original Actual Completion Completion Percent One-Time One-TimeProjected Projected
by Department Description Start Date Start Date Date Date Complete Cost Cost Savings Savings
Employment Development Department
Tax Engineering and Document tracking, Jun–97 Jun–97 Jun–99 Apr–01 75% $67.7 $71.7 $2.3 $2.3
Modernization (TEAM) workload management
Personal Identification Number (PIN) Benefit programs May–00 Oct–00 Jun–00 Jun–01 55 2.3 2.3 0.0 0.0
Independent Contractor Reporting Child support Nov–99 Nov–99 Jan–01 Jan–01 90 1.3 1.3 0.0 0.0
(Senate Bill 542)
Equalization, Board of
Return Processing Automation Project Financial, workflow, Apr–00 Apr–00 Apr–02 Apr–02 1 28.4 28.4 27.6 27.6
workload management
Revenue Database Workflow, workload Jan–01 Jan–01 Sep–04 Sep–04 10 15.3 15.3 35.2 35.2
Consolidation/AB 2114 management
Field Office Automation Workflow, workload Oct–96 Jul–97 May–06 Jun–03 20 5.0 5.0 64.5 64.5
management
PC Hardware and Software Refresh Boardwide infrastructure Sep–00 Sep–00 Jun–01 Jun–01 5 2.5 2.5 0.0 0.0
maintenance
Fish and Game, Department of
IT Computing Services Department IT services Aug–01 ‡ Jun–02 ‡ 0 5.0 ‡ 0.0 ‡
Office Automation Standards Office automation Aug–01 ‡ Jun–03 ‡ 0 5.0 ‡ 0.0 ‡
Automated Licensing Data System Licensing Jul–01 ‡ Jun–02 ‡ 0 4.8 ‡ 0.2 ‡
Franchise Tax Board
Integrated Nonfiler Compliance (INC) Revenue management, Jul–98 Jul–98 Dec–01 Dec–01 75 46.3 46.3 67.5 67.5
tax assessment
Accounts Receivable Collection Revenue management, Apr–98 Apr–98 Jun–00 Mar–01 90 33.0 36.3 39.7 68.0
System (ARCS) tax assessment
Modernization and Reengineering Revenue management, Jun–98 Jun–98 Jun–01 Jun–01 50 6.6 8.1 9.2 0.0
Cashiering System (MARCS) tax assessment
Network Backbone Support Mar–00 Mar–00 Dec–01 Jul–05 20 6.3 6.1 0.0 0.0
Data Center Infrastructure Improvement Audit Jul–01 ‡ Nov–02 Nov–02 0 4.6 4.6 0.0 0.0
General Services, Department of
Procurement Division (PD) Cal–Buy Procurement Oct–00 Oct–00 Oct–01 Jun–01 50 9.4 5.3 13.0 7.3
Executive Branch (EB) Network Workload Jul–00 Nov–00 Apr–01 May–01 90 1.5 3.0 1.5 1.5
EB California Homepage eGovernment Oct–00 Sep–00 Dec–01 Dec–01 50 1.4 3.7 1.6 1.6
‡ This project has not started; therefore, these dates or costs are not applicable. Continued
85
Original Revised Original Current
Projected Projected Projected Projected Original Current
Projects Listed Original Actual Completion Completion Percent One-Time One-Time Projected Projected
by Department Description Start Date Start Date Date Date Complete Cost Cost Savings Savings
Health and Human Services Agency
Data Center
Statewide Automated Welfare System Case management, Oct–99 Feb–00 Dec–03 Dec–03 6% $245.7 $318.0 $518.9 $593.0
(SAWS) – Welfare Case Data System human resources,
(WCDS) Consortium telecommunication,
eligibility determination,
welfare
SAWS – Los Angeles Eligibility Automated Case management, Oct–95 Nov–95 Mar–99 Apr–01 94 76.5 114.0 374.6 374.6
Determination, Evaluation and Reporting financial, workload
(LEADER) Consortium management, eligibility
determination
SAWS – Welfare Data Tracking Case management, Mar–99 Mar–99 Jul–00 Dec–01 59 9.7 11.9 0.0 0.0
Implementation Project (WDTIP) financial
Statewide Fingerprint Imaging System (SFIS) Fingerprint Jul–95 Nov–95 Sep–03 Apr–01 98 7.4 17.3 125.0 125.0
Electronic Benefit Transfer (EBT) Financial Jul–97 Jul–97 Feb–01 Nov–04 0 6.9 6.9 521.0 521.0
SAWS Consortium IV Case management, Dec–97 Dec–97 Aug–04 Jul–04 0 5.8 6.0 467.4 467.4
human resources,
telecommunication,
eligibility determination
SAWS – Interim Statewide Automated Eligibility determination Jul–99 Jul–99 Jun–01 Jul–01 60 2.6 6.4 0.0 7.0
Welfare System (ISAWS) – Welfare
Reform and Infrastructure
Modifications (WRIM)
SAWS – CalSERV Middleware Case management Jul–99 Jul–99 Feb–03 Feb–03 0 1.1 1.3 0.0 0.0
Health Planning and Development,
Office of Statewide
Medical Information Reporting Document tracking, Sep–00 Sep–00 Dec–02 Dec–02 10 5.2 5.2 0.0 0.0
for California (MIRCal) workflow, workload
management,
hospital patient data
Health Services, Department of
DHS Health Insurance Portability
and Accountability Act (HIPAA) All health care Jun–00 Jun–00 Nov–02 Nov–02 0 21.9 † 0.0 0.0
Business Systems Replacement General accounting Jul–98 Mar–99 Apr–99 Jul–01 90 5.7 5.1 8.1 8.1
† The cell was left blank in the survey or the response was incomplete. Continued
86
Original Revised Original Current
Projected Projected Projected Projected Original Current
Projects Listed Original Actual Completion Completion Percent One-Time One-TimeProjected Projected
by Department Description Start Date Start Date Date Date Complete Cost Cost Savings Savings
Health Services, Department of (continued)
Children’s Medical Services Case management, Jul–96 Jan–98 Sep–01 Dec–02 22% $5.6 $10.2 $67.3 $20.1
Net/Enhancement 47 (CMS Net 47) document tracking
Richmond Lab IT Support Telecommunication Jul–00 Jul–00 Jun–06 Jun–06 20 4.7 4.7 0.0 0.0
Computer Utilization for Radiation Licensing Nov–98 Nov–98 Jun–02 † 18 3.6 † 2.8 †
Information and Enforcement (CURIE)
Statewide Immunization Information Patient care Jul–95 Jan–01 Jul–00 Jul–03 0 2.6 3.0 10.4 10.4
System [SIIS (IZ Registry)]
Newborn Hearing Screening Project, Case management, Jul–99 Jul–99 Dec–02 Dec–02 35 0.9 2.4 7.5 7.5
Data Management System document tracking
Highway Patrol, California Department of
Statewide Integrated Traffic Law enforcement Aug–98 Aug–00 Jul–01 Apr–02 10 3.1 2.3 0.0 0.0
Records System (SWITRS)
California Automated Law enforcement Jan–95 Apr–97 Jun–99 Jul–02 65 2.0 2.0 0.0 0.0
Reporting System (CARS)
Graphical User Interface (GUI) Law enforcement Mar–00 Oct–00 Jul–02 Apr–03 5 1.3 1.3 0.0 0.0
Activity and Attendance System Human resources Dec–92 Jun–92 Mar–98 Dec–01 75 1.1 1.4 0.7 0.1
Industrial Relations, Department of
Division of Workers’ Compensation Workers’ Jul–97 Jul–97 Dec–99 Jan–01 90 0.5 1.0 2.9 0.0
(DWC) Workers’ Compensation compensation
Information System (WCIS)
Justice, Department of
Automated Criminal History Law enforcement Jun–00 Jun–00 Jun–03 Jun–03 20 15.1 15.1 0.0 0.0
System (ACHS) Migration
Statewide Integrated Narcotic Law enforcement Jul–00 Jul–00 Jun–05 Jun–05 10 8.1 8.1 0.0 0.0
System (SINS) Enhancements
Consolidated Firearms Information Law enforcement Dec–99 Dec–99 Dec–01 Dec–01 75 3.9 3.9 0.0 0.0
System (CFIS) Enhancements
California Automated Palm Print Law enforcement, Jul–99 Jul–99 Jun–01 Jun–01 10 2.7 2.7 0.0 0.0
automated fingerprint
identification system (AFIS)
National Sex Offender Law enforcement Jan–99 Jan–99 Jun–00 Dec–01 25 2.3 2.6 0.0 0.0
Registry (NSOR)
† The cell was left blank in the survey or the response was incomplete. Continued
87
Original Revised Original Current
Projected Projected Projected Projected Original Current
Projects Listed Original Actual Completion Completion Percent One-Time One-TimeProjected Projected
by Department Description Start Date Start Date Date Date Complete Cost Cost Savings Savings
Motor Vehicles, Department of
Administrative and Financial Financial, Jul–99 Nov–99 Jun–02 Jun–02 30% $14.0 $16.4 $0.2 $0.3
Systems Redesign (AFSR) general accounting
Vehicle License Fee (VLF) Rebate Financial, registration, Aug–00 Aug–00 Jun–01 Apr–01 95 6.0 6.0 0.0 0.0
titling
Field Office Terminal Replacement Infrastructure Jul–98 ‡ Jun–01 Sep–03 0 3.5 7.3 0.0 0.0
Personnel Board, State
Automated Case Tracking System Case management, Jul–00 Jul–00 Dec–00 Feb–01 66 1.4 1.4 0.0 0.0
document tracking,
workflow, workload
Pesticide Regulation, Department of
Enforcement and Compliance
Action Tracking System Enforcement Jul–98 Jul–99 Dec–99 Mar–01 75 1.2 1.2 -1.2 -1.2
Public Employees’ Retirement System
Straight Through Processing (STP) Retirement, Jan–01 Jan–01 FY 2002–03 FY 2004–05 0 31.0 31.0 0.0 †
(Investment settlement seamless process) member benefits
CalPERS Online Member & Employer Benefits Jul–99 Jul–99 Dec–03 Jan–04 30 17.5 2.4 † †
Transaction System (COMET) Phase IV, management
Project 2 (Contribution Reporting Systems)
Customer Contact Center Contact center May–00 May–00 Jun–01 Jun–02 1 15.1 15.3 † †
COMET Database Redesign Phase IV, Benefits Jul–98 Jul–98 Mar–01 Sep–01 72 14.3 14.3 0.0 †
Project 1 (Employer Contracts & management
Participant Registration)
eBusiness/Automated Communication Retirement, Jul–00 Jun–00 Jun–01 Jun–01 30 3.6 5.8 0.0 †
Exchange System (ACES) FY 00/01 health insurance
eService/Member Self–service FY 00/01 Retirement Jul–00 Jul–00 Jun–01 Jun–01 36 2.1 2.4 0.0 †
Middleware Tool Implementation Retirement, Jul–00 Jul–00 Jun–01 Jun–01 15 2.0 2.5 0.0 †
member benefits
COMET Phase IV, Project 3 Benefits Jul–98 Jul–98 Mar–01 Sep–01 72 1.8 1.8 0.0 †
(SCO Transaction Log) management
Service Level Improvements Project Business process Jul–00 Jul–00 Feb–02 Feb–02 18 0.7 1.9 0.0 †
reengineering
‡ This project has not started; therefore, these dates or costs are not applicable.
† The cell was left blank in the survey or the response was incomplete. Continued
88
Original Revised Original Current
Projected Projected Projected Projected Original Current
Projects Listed Original Actual Completion Completion Percent One-Time One-TimeProjected Projected
by Department Description Start Date Start Date Date Date Complete Cost Cost Savings Savings
Real Estate, Department of
Licensing Tracking System Licensing Jul–94 Jul–97 Jun–00 Jun–01 80% $ 2.7 $ 6.7 $0.0 $0.2
Rehabilitation, Department of
Field LAN/WAN Project Human resources Aug–00 Aug–00 Sep–01 Sep–01 40 3.5 3.5 2.0 2.0
case management,
asset management
Resources Agency
California Land Science Information Environmental Feb–98 Feb–98 Jun–03 Jun–03 70 1.4 † –1.4 †
Partnership (CaLSIP) planning,
management
Social Services, Department of
Community Care Licensing Division Licensing Aug–97 Aug–97 Mar–01 Jun–01 70 2.4 2.4 0.0 0.0
Information System
Integration – Phase I & II
Community Care Licensing Division Licensing Aug–99 Mar–99 Jul–01 Mar–02 40 2.2 2.2 0.0 0.0
Information System
Enhancement – Phase III
Student Aid Commission, California
Grant Delivery System (GDS) Financial Dec–00 Dec–00 Dec–02 Dec–02 0 9.4 9.4 0.0 0.0
Entitlement Implementation (SB 1644)
Teacher Credentialing, Commission on
Teacher Credentialing Service Licensing Jul–01 ‡ Dec–02 Dec–02 0 6.4 6.4 0.0 0.0
Improvement Project
Teachers’ Retirement System, State
State Teachers’ Automation Case management, Aug–95 Aug–95 Mar–00 Mar–01 90 21.7 21.7 0.0 0.0
Redesign Team (START) financial
Corporate Imaging Project Document tracking, Jul–01 ‡ Sep–03 Sep–03 0 4.4 4.4 0.0 0.0
workflow
Transportation, Department of
District 07 Showcase Program Intelligent transportation Jul–94 Jun–95 Jun–02 Jun–02 65 30.0 30.0 0.0 0.0
systems (ITS) research demo
District 00 Advanced Toll Collection Toll collection Oct–92 Jun–93 Jan–97 Dec–01 65 27.8 56.1 2.4 2.5
& Accounting System (ATCAS)
* The cell was left blank in the survey or the response was incomplete.
‡ This project has not yet started; therefore, these dates or costs are not applicable. Continued
89
Original Revised Original Current
Projected Projected Projected Projected Original Current
Projects Listed Original Actual Completion Completion Percent One-Time One-TimeProjected Projected
by Department Description Start Date Start Date Date Date Complete Cost Cost Savings Savings
Transportation, Department of (continued)
District 00 Transportation Operations Human resources Jan–98 Apr–98 Jun–01 Jun–01 5% $18.6 $18.6 $5.4 $1.8
Project System (TOPSS–II)
District 00 Transportation Permits Apr–01 Jun–01 Jul–02 Jul–02 5 15.0 15.0 0.0 0.0
Permits (TPMS2000)
District 00 Construction Management Project Jul–02 Jul–02 Jun–04 Jun–04 0 11.6 11.6 28.6 28.6
System 1 management
District 00 Integrated Maintenance Highway Jan–00 Feb–00 Dec–02 Dec–02 30 8.5 8.5 12.0 12.0
Management System (IMMS) inventory
District 07 Los Angeles Regional Traffic Oct–98 Oct–98 Oct–02 Oct–02 70 4.5 4.5 † †
Transportation Management Center Systems management
District 00 Lane Closure Project Jul–02 Jul–02 Jun–04 Jun–04 0 4.4 4.4 0.0 0.0
management
District 00 Caltrans Land Project Jul–02 Jul–02 Feb–04 Feb–04 0 4.1 4.1 5.7 5.7
Management System management
District 00 Project Resources & Schedule Project Jul–00 Jul–00 Dec–02 Dec–02 5 4.0 11.5 0.0 0.0
Management (PRSM) management
District 00 Project Management Information Project Oct–98 Oct–98 Dec–99 Jun–02 75 4.0 4.0 0.0 0.0
System – Toll Bridge (PMIS–TB) management
District 00 Traffic Accidents Database – Traffic Jul–98 May–99 Dec–00 Jul–01 75 2.7 2.1 0.5 0.5
District Access operations
District 59 CTBRIDGE (Computer Software Engineering Jan–98 Jan–98 Dec–01 Dec–07 33 1.5 3.1 0.0 0.0
Used by Engineers to Design Bridges
According to California Requirements)
District 59 Conversion of Right of Way Document Oct–98 Oct–98 Jun–02 Jun–02 67 1.5 1.5 21.1 21.1
Maps and Survey Records to Archivable conversion,
Electronic Format archiving
District 00 District 04 Traffic Management Project Apr–00 May–99 Apr–04 Apr–04 75 1.5 1.5 0.0 0.0
Center Support management
District 00 Extra Work Billing System (EWB) Workload Aug–99 Aug–99 Sep–00 Feb–02 50 1.2 2.2 0.0 0.0
management
† The cell was left blank in the survey or the response was incomplete. Continued
90
Original Revised Original Current
Projected Projected Projected Projected Original Current
Projects Listed Original Actual Completion Completion Percent One-Time One-TimeProjected Projected
by Department Description Start Date Start Date Date Date Complete Cost Cost Savings Savings
Treasurer, State
Debt Management System Redesign Bond issue Aug–00 Aug–00 Aug–01 Aug–01 40% $1.2 $1.0 $0.0 $0.0
Project (STRIPS) Phase 1
Veterans Affairs, Department of
Veterans Home Information Complete Jun–98 Sep–98 Apr–99 Jun–02 80 5.4 5.2 -5.4 -5.2
System (Yountville) health care
system
Veterans Home Information System Complete Oct–99 Nov–99 Oct–00 † 20 1.8 2.1 -1.8 -2.1
(Chula Vista) health care
system
Water Resources Control Board, State
Geographic Environmental Information Track tank Mar–00 Mar–00 Mar–01 Mar–01 60 1.4 1.4 0.0 0.0
Management System (GEIMS) sites
System for Water Information Information on May–99 May–99 Jun–99 Jun–00 50 0.8 1.8 2.1 0.8
Management (SWIM) state water quality
Water Resources, Department of
Exchange: Advanced Enterprise E–mail Advanced enterprise Feb–01 Feb–01 Oct–01 Oct–01 2 1.5 1.5 0.4 0.4
and Groupware Project e–mail, groupware
Youth Authority, Department of the
California Youth Authority (CYA) E–Rate Telecommunication Jul–00 Jan–01 Jun–01 Jun–01 0 5.9 † 0.0 †
Digital High School Program
Youthful Offender Database (YODA) Case management, Jul–96 Oct–97 Dec–00 Sep–01 90 1.0 1.9 0.0 0.5
document tracking,
workload
† The cell was left blank in the survey or the response was incomplete. Continued
91
The following departments reported no projects in development with estimated costs greater than $1 million:
Administrative Law, Office of Environmental Health Hazard Assessment, Office of Peace Officer Standards and Training, Commission on
African American Museum Environmental Protection Agency, California Personnel Administration, Department of
Aging, Department of Exposition and State Fair, California Postsecondary Education Commission, California
Agricultural Labor Relations Board Fair Employment and Housing, Department of Prison Terms, Board of
Air Resources Board Fair Political Practices Commission Public Employment Relations Board
Alcohol and Drug Programs, Department of Finance, Department of Public Utilities Commission
Alcoholic Beverage Control, Department of Financial Institutions, Department of Real Estate Appraisers, Office of
Arts Council, California Food and Agriculture, Department of San Francisco Bay Conservation and
Development Commission
Boating and Waterways, Department of Forestry and Fire Protection,
Department of Santa Monica Mountains Conservancy
Building Standards Commission, California
Health and Human Services Agency, California Science Center, California
Business, Transportation and
Housing Agency Horse Racing Board, California Secretary of State
Child Support Services, Department of Housing and Community Development, Department of State and Consumer Services Agency
Coastal Commission, California Housing Finance Agency, California State Lands Commission
Coastal Conservancy, State Inspector General, Office of the Stephen P. Teale Data Center
Colorado River Board of California Insurance Advisor, Office of Tahoe Conservancy, California
Community Colleges, Board of Governors Insurance, Department of Technology, Trade and Commerce Agency, California
Community Services and Development, Department of Integrated Waste Management Board, California Toxic Substances Control, Department of
Conservation Corps, California Law Revision Commission, California Traffic Safety, Office of
Consumer Affairs, Department of Library, California State Unemployment Insurance Appeals
Board, California
Corporations, Department of Lottery Commission, California State
Youth and Adult Correctional Agency
Corrections, Board of Managed Health Care, Department of
Youthful Offender Parole Board
Criminal Justice Planning, Office of Managed Risk Medical Insurance Board
Education, Office of the Secretary for Mandates, Commission on State
Education, State Board of Medical Assistance Commission, California
Emergency Medical Services Authority Mental Health, Department of
Emergency Services, Office of Military Department-Office of the
Adjutant General
Employment Training Panel
Narcotic Addict Evaluation Authority
Energy Resources, Conservation and
Development Commission Parks and Recreation, Department of
TABLE 8
Summary of Departments’ IT Projects
Completed Projects Projects In Development
Development Development Development Development Total
Costs Greater Costs Less No Reported Costs Greater Costs Less Number of
Than Than Development Than Than Reported
Department $1 Million $1 Million Costs $1 Million $1 Million Projects
Administrative Law, Office of 0 0 0 0 0 0
African American Museum 0 0 0 0 0 0
Aging, Department of 0 2 0 0 0 2
Agricultural Labor Relations Board 0 0 0 0 0 0
Air Resources Board 0 2 0 0 0 2
Alcohol and Drug Programs, 0 19 0 0 3 22
Department of
Alcoholic Beverage Control, Department of 0 0 0 0 0 0
Arts Council, California 0 1 0 0 0 1
Boating and Waterways, Department of 0 4 0 0 0 4
Building Standards Commission, California 0 0 0 0 0 0
Business, Transportation and 0 4 0 0 0 4
Housing Agency
California Victim Compensation and 0 5 0 1 0 6
Government Claims Board
(formerly the State Board of Control)
Child Support Services, Department of 1 0 0 0 0 1
Coastal Commission, California 0 4 0 0 0 4
Coastal Conservancy, State 0 0 0 0 0 0
Colorado River Board of California 0 0 0 0 0 0
Community Colleges, Board of Governors 0 10 0 0 3 13
Community Services and Development, 0 5 0 0 0 5
Department of
Conservation Corps, California 0 7 0 0 10 17
Conservation, Department of 0 5 0 1 4 10
Consumer Affairs, Department of 6 114 0 0 10 130
Controller, State 0 0 6 1 1 8
Corporations, Department of 0 62 0 0 0 62
Corrections, Board of 0 6 0 0 0 6
Corrections, Department of 4 61 0 4 2 71
Criminal Justice Planning, Office of 0 17 0 0 1 18
Developmental Services, Department of 3 22 0 2 3 30
Education, Department of 0 13 4 1 2 20
Education, Office of the Secretary for 0 0 0 0 0 0
Education, State Board of 0 0 0 0 0 0
Emergency Medical Services Authority 0 4 0 0 1 5
Continued
92
Completed Projects Projects In Development
Development Development Development Development Total
Costs Greater Costs Less No Reported Costs Greater Costs Less Number of
Than Than Development Than Than Reported
Department $1 Million $1 Million Costs $1 Million $1 Million Projects
Emergency Services, Office of 0 4 0 0 8 12
Employment Development Department 5 19 1 3 6 34
Employment Training Panel 0 9 0 0 0 9
Energy Resources, Conservation and 0 21 0 0 4 25
Development Commission
Environmental Health Hazard 0 0 0 0 0 0
Assessment, Office of
Environmental Protection 0 0 0 0 0 0
Agency, California
Equalization, Board of 2 6 0 4 8 20
Exposition and State Fair, California 0 3 0 0 0 3
Fair Employment and Housing, 0 2 0 0 1 3
Department of
Fair Political Practices Commission 0 0 0 0 2 2
Finance, Department of 0 12 16 0 2 30
Financial Institutions, Department of 0 0 0 0 0 0
Fish and Game, Department of 1 8 0 3 1 13
Food and Agriculture, Department of 0 125 0 0 26 151
Forestry and Fire Protection, 0 37 0 0 7 44
Department of
Franchise Tax Board 14 30 0 5 9 58
General Services, Department of 3 114 0 3 14 134
Health and Human Services Agency 2 5 0 8 0 15
Data Center
Health and Human Services 0 0 0 0 0 0
Agency, California
Health Planning and Development, 0 15 0 1 1 17
Office of Statewide
Health Services, Department of 7 180 1 7 36 231
Highway Patrol, California Department of 1 47 0 4 8 60
Horse Racing Board, California 0 1 0 0 1 2
Housing and Community Development, 1 15 0 0 0 16
Department of
Housing Finance Agency, California 0 6 0 0 1 7
Industrial Relations, Department of 0 51 0 1 2 54
Inspector General, Office of the 0 0 0 0 1 1
Insurance Advisor, Office of 0 0 0 0 0 0
Insurance, Department of 1 1 0 0 13 15
Integrated Waste Management 0 22 0 0 0 22
Board, California
Justice, Department of 19 11 0 5 2 37
Law Revision Commission, California 0 0 0 0 0 0
Continued
93
Completed Projects Projects In Development
Development Development Development Development Total
Costs Greater Costs Less No Reported Costs Greater Costs Less Number of
Than Than Development Than Than Reported
Department $1 Million $1 Million Costs $1 Million $1 Million Projects
Library, California State 0 0 0 0 0 0
Lottery Commission, California State 4 18 0 0 5 27
Managed Health Care, Department of 0 11 0 0 6 17
Managed Risk Medical Insurance Board 0 3 0 0 0 3
Mandates, Commission on State 0 0 0 0 1 1
Medical Assistance Commission, California 0 2 0 0 0 2
Mental Health, Department of 0 44 0 0 0 44
Military Department-Office of the 1 20 0 0 0 21
Adjutant General
Motor Vehicles, Department of 10 13 0 3 1 27
Narcotic Addict Evaluation Authority 0 0 0 0 0 0
Parks and Recreation, Department of 0 7 0 0 1 8
Peace Officer Standards and Training, 0 4 0 0 0 4
Commission on
Personnel Administration, Department of 0 4 0 0 0 4
Personnel Board, State 0 15 0 1 1 17
Pesticide Regulation, Department of 0 20 0 1 1 22
Postsecondary Education 0 0 0 0 1 1
Commission, California
Prison Terms, Board of 0 3 0 0 0 3
Public Employees’ Retirement System 7 84 13 9 0 113
Public Employment Relations Board 0 3 0 0 1 4
Public Utilities Commission 2 20 0 0 1 23
Real Estate Appraisers, Office of 0 0 0 0 0 0
Real Estate, Department of 0 0 0 1 1 2
Rehabilitation, Department of 1 25 0 1 0 27
Resources Agency 0 1 0 1 0 2
San Francisco Bay Conservation and 0 0 0 0 0 0
Development Commission
Santa Monica Mountains Conservancy 0 0 0 0 0 0
Science Center, California 0 0 0 0 0 0
Secretary of State 6 1 0 0 0 7
Social Services, Department of 1 32 1 2 3 39
State and Consumer Services Agency 0 0 0 0 0 0
State Lands Commission 0 13 0 0 3 16
Stephen P. Teale Data Center 0 7 0 0 0 7
Student Aid Commission, California 1 2 0 1 1 5
Tahoe Conservancy, California 0 4 0 0 0 4
Continued
94
Completed Projects Projects In Development
Development Development Development Development Total
Costs Greater Costs Less No Reported Costs Greater Costs Less Number of
Than Than Development Than Than Reported
Department $1 Million $1 Million Costs $1 Million $1 Million Projects
Teacher Credentialing, Commission on 0 28 0 1 0 29
Teachers’ Retirement System, State 1 0 0 2 0 3
Technology, Trade and Commerce 0 8 0 0 1 9
Agency, California
Toxic Substances Control, Department of 0 19 0 0 6 25
Traffic Safety, Office of 0 2 0 0 6 8
Transportation, Department of 23 298 0 16 27 364
Treasurer, State 1 10 0 1 2 14
Unemployment Insurance Appeals 0 0 0 0 1 1
Board, California
Veterans Affairs, Department of 2 8 0 2 11 23
Water Resources Control Board, State 1 7 0 2 0 10
Water Resources, Department of 3 78 0 1 1 83
Youth and Adult Correctional Agency 0 0 0 0 0 0
Youth Authority, Department of the 0 31 0 2 3 36
Youthful Offender Parole Board 0 7 0 0 3 10
State Totals 134 1,963 42* 101 281 2,521
* The departments reported that data are no longer available for these projects because they are older projects.
95
Blank page inserted for reproduction purposes only.
96
Agency’s comments provided as text only.
Department of Information Technology
801 K Street, Suite 2100
Elias S. Cortez, Director
Sacramento, CA 95814
June 13, 2001
Ms. Elaine M. Howle, State Auditor*
Bureau of State Audits
555 Capitol Mall, Suite 300
Sacramento, California 95814
Dear Ms. Howle:
The Department of Information Technology (DOlT) appreciates the opportunity to provide a
response to your draft report dated June 7, 2001. These recommendations are consistent with
DOlT’s direction in implementing the State of California’s Enterprise Portfolio Management Sys-
tem (Information Technology Circle of Life) which addresses the full technology lifecycle from
concept through implementation and on into maintenance and operations. DOlT has either
1
initiated or implemented these recommendations. This enterprise direction ensures that DOlT
actively engages its customers throughout the entire project lifecycle, providing vigorous and
ongoing oversight while sustaining collaborative efforts that stress the use of industry best
practices, standard metrics, and concise yet rigorous documentation and performance measure-
ment.
2
We are however disappointed with the BSA’s approach to the audit and the limited valuable
recommendations for what was surely a costly and time-consuming review. Specifically, the BSA
auditors tended to focus on reviewing policies, procedures, and documentation, mostly from
previous administration practices, rather than assessing the value and results of DOlT’s current
administration activities. Many of the BSA’s findings are based on the lack of artifacts.
2
We find little in the two chapters of the report we received that address or recommend any
substantive reforms of the previous administration’s practices in the way the State manages its
information technology investments, such as IT governance, which is a challenge for most
government IT enterprises. To the contrary, one of the BSA’s recommendations is that DOlT
should “. . . build upon past efforts to the extent possible rather than reinventing processes and
practices when planning its future activities.”
3
In essence, the BSA is suggesting that the current administration build upon the flawed pro-
cesses and practices of the previous administration. Unfortunately, it is these very practices and
processes of the previous administration that failed to identify, prevent, or minimize the failure of
the Statewide Automated Child Support Enforcement System (SACSS) in 1997 which was cited
by the BSA as one of the State’s costly failures. This and other failures resulted in nearly $500
million of wasted taxpayer money. Surely returning to such practices would be counterproductive.
* California State Auditor’s comments begin on page 141.
97
Furthermore, the BSA’s Analysis of Audit Request states that Assemblymember Wildman is
“concerned about ongoing problems state departments are having implementing IT systems.”
4
The BSA appears to focus primarily on DOlT and does not address the IT governance challenge
in managing the state’s information technology investments. The BSA’s focus on DOlT may lead
one to the conclusion that all of the Administration’s challenges with information technology could
be solved with more oversight. While we recognize the value of information technology project
review, approval, and monitoring by an independent party like DOlT, we also recognize that such
controls have their limitations. A more effective enterprise, cross-cutting approach to managing
the state’s information technology investments will address both the departments directly respon-
sible for managing those investments as well as the oversight organizations like DOlT, the De-
partment of Finance, and the Department of General Services.
Our disappointment with the results of the audit is amplified by the BSA’s focus on compliance
5
issues rather than effectiveness or outcomes. The auditors relied upon a typical compliance audit
approach of comparing DOlT’s actions against the requirements of the law. While compliance is
obviously important, it does not tell the whole story because it does not address current effective-
ness. The audit report does not highlight how the progressive enterprise approach by DOlT is
adding value and improving the state’s management of its investments in information technology.
6
The fact of the matter is that the BSA did not identify any failed, major IT projects that were
approved or sponsored by this Administration.
7
In addition, the BSA did not address one important objective of audit regarding the constraints on
sufficiency of resources. Specifically, objective #8 of the audit listed in the BSA’s June 27, 2000
Analysis of Audit Request states that the BSA audit would “evaluate the sufficiency of the re-
sources allocated to DOlT (by the prior administration) to fulfill its statutory responsibilities.” The
lack of sufficient resources has recently been a major issue for DOlT since its inception and has
certainly contributed to some of the deficiencies noted by the BSA. To address this issue, the
current Administration and Legislature allocated an additional 40 PYs for fiscal year 2000-01 and
DOlT is just beginning to benefit from the additional resources. However, recruitment and reten-
tion of staff to fill the authorized positions is impeded by the impending threat from the sunset
date for DOlT and the general nature of the IT job market, an 18% factor in the State.
The BSA acknowledges that recruitment and retention of staff is a severe problem for DOlT but
8
again fails to explore the cause of that problem. Many of the high caliber staff sought by DOlT is
reluctant to join an organization that may be eliminated by the impending sunset date of DOlT
which is June 30, 2002 according to current state law. Likewise, existing staff seek positions in
other state organizations in advance of the sunset date. The BSA’s failure to analyze the cause of
the problems they cite leaves the Legislature with little new information and virtually no recom-
mendations regarding the types of reforms needed to improve the situation. The administration
seeks to address this problem by repealing of the sunset provisions through AB 1559 (Diaz).
98
Finally, it is important to note that many of the instances in which the BSA finds that DOlT failed to
develop artifact of its review of a project occurred in the midst of the Y2K readiness efforts. DOlT
and this administration made a conscious decision to re-direct scarce DOlT resources from other
responsibilities to focus on the higher priority and higher risk Y2K remediation efforts. For ex-
ample, the Governor issued Executive Order D-3-99 which stated that the Year 2000 solutions
shall be the State’s top technology priority. DOlT made resources available to the Y2K effort by
spending less time producing artifact of reviews of projects. This redirection of resources was
partially in response to concerns raised by the BSA in its July, 1998 report regarding Y2K. There-
9
fore, we find the BSA’s criticism of the lack of artifact of such reviews during the Y2K time period
in conflict with what the Governor, DOlT, and BSA concluded was the highest IT priority for the
State at the time.
DOlT recognized many of the recommendations noted by the BSA before the BSA began its
review and took steps to rectify the situation. Based upon the success of DOlT’s project manage-
ment office (PMO) approach to the Y2K crisis, we began a series of initiatives that emphasize an
enterprise approach to our responsibilities. For example, DOlT worked with the Department of
General Services to encourage state and local agencies to negotiate an enterprise-wide software
license thereby leveraging the State’s enormous buying power. These efforts resulted in esti-
mated savings of tens of millions of dollars for state and county entities. Other enterprise initia-
tives include Enterprise Program Management System (IT Circle of Life) and Enterprise Geo-
graphical Information Systems (GIS).
In summary, we agree with the BSA that a great deal of important work remains to reconstruct
0
previous administration’s flawed IT management infrastructure. As the BSA points out in its
report, the current administration and DOlT are in the process of addressing these needs in a
proactive and collaborative manner. More importantly, DOlT is focusing its business process re-
engineering activities to ensure that DOlT is adding value and increasing the level of assurance
that the state’s investment in information technology is properly managed.
We appreciate the professionalism of the BSA’s staff and the opportunity to provide input to the
audit report. If you have any questions or require any additional information, please call me at
(916) 445-3050.
Sincerely,
(Signed by: Elias S. Cortez)
ELIAS S. CORTEZ
Director
Attachments
99
Executive Summary
Background
“I believe that the Department of Information Technology has proven itself to
be an indispensable leader of the State’s technology management strategy.”
Governor Gray Davis
The Davis Administration has raised the bar of accountability for information technology (IT)
management to its highest levels to deliver quality service to all Californians. This
Administration’s leadership has empowered the Department of Information Technology (DOIT)
to ensure that all IT initiatives under its watch represent sound IT investments and utilize IT
best practices to secure their successful implementation.
6
California has had zero major IT failures for projects initiated under the Davis Administration.
As evidenced by the recent government IT report cards, we have raised California’s IT man-
agement capabilities from below average during the prior Administration to above average
during the Davis Administration by embracing industry best practices. We are committed to
continue this upward trend.
DOIT has established itself as the leader in government IT. More importantly, the Administra-
tion has provided effective leadership and executive sponsorship to transform a dysfunctional,
“stovepipe” IT program into an enterprise focused technology leader by investing precious
resources to implement successful IT initiatives such as year 2000 remediation (Y2K), Elec-
tronic Government (eGovernment), software management, and enterprise project manage-
ment, which enhance our State programs and services.
Over the past two years, DOIT has provided an exceptional return on investment at a very
efficient rate of less than 1% of statewide IT expenditures.
Contrary to BSA’s findings, the challenge that California government faces is NOT IT leader-
q
ship BUT governance. Most decentralized government entities also face this challenge. Very
few have implemented successful governance models without going through the growing pains
of addressing long term systemic IT management infrastructure issues. The Davis
Administration’s enterprise approach to government IT coupled with DOIT’s Enterprise Portfolio
Management initiative clearly exemplify the governance model that will successfully transform
the previous command-and-control governance structure to a collaborative and tightly knit
model. Such an approach dictates heavy emphasis on vetting, planning, risk management,
and value effective IT investments that will maximize government funds through enterprise
strategies rather than “stovepipe” solutions with inherently costly redundancies.
California is confronted with an extremely complex and distributed IT organizational model. As
the business and technology dynamics change, DOIT’s target is continuously moving to
100
accommodate such dynamics. To that end, DOIT relies heavily on statewide workgroups of
Chief Information Officers as well as several intergovernmental and private sector councils to
formulate its crosscutting IT leadership, guidance, and oversight capabilities. This approach
has enabled the Davis Administration to navigate successfully through grave circumstances
such as Y2K while also providing the flexibility to adapt to pioneering efforts such as
eGovernment and Geographic Information Systems. Also, this approach provides the State
with the strategic capabilities to confront and manage other major IT mandates such as the
Health Insurance Portability and Accountability Act (HIPAA) that may require sweeping IT
initiatives.
The audit has raised some valid issues, which the Davis Administration has recognized upon
taking office in 1999. The fragmented approach used by the prior Administration resulted in IT
losses of over $500 million. The systemically flawed IT management infrastructure left behind
by the prior Administration impacted every aspect of the then IT management life cycle from
planning to maintenance and operation. Unfortunately, out of about 300 projects received by
w
DOIT annually, the majority of the 10 projects that the BSA examined were based on these
systemically flawed processes.
The statewide plan of 1997 developed by the prior Administration does require substantial
revisions to clearly reflect and leverage the invaluable capabilities the Davis Administration
introduced to California government during Y2K and eGovernment implementation. Upon
successful completion of Y2K and eGovernnment, DOIT launched the Enterprise IT Strategic
Planning program by forming a statewide Chief Information Officer workgroup focused on
revamping the 1997 statewide strategic plan. This effort will result in enterprise planning capa-
bilities that tightly couple the departmental plans with the statewide plan and will continuously
refresh California government service delivery capabilities through technology integration. The
revised statewide plan will reflect the State of California Enterprise IT needs and should be
available during 2001-2002.
In addition to launching the Enterprise IT Strategic Planning program, DOIT is implementing
three other programs that are natural iterations of the DOIT Enterprise IT Portfolio Management
initiative:
(cid:226)
IT Policies and Standards Program
(cid:226)
IT Project Submittal and Approval Program
(cid:226)
IT Oversight and Online Early Warning Program
These programs are designed to transform the prior “stovepipe” nature of government IT in
California to that of enterprise IT management capabilities, i.e. eGovernment, which will clearly
address the systemic and procedural flaws of past IT practices.
To completely revamp the systemic aspects of previous IT management practices, DOIT has
launched four additional programs to complete the enterprise IT management life cycle from
101
planning to maintenance and operations and on into asset management. These programs
include:
(cid:226)
IT Risk Management and Corrective Action Program (Special Project Report)
(cid:226)
IT Post Implementation Evaluation Program
(cid:226)
IT Maintenance and Operations Program
(cid:226)
IT Asset Management Program
These Enterprise Programs launched by DOIT are targeted for statewide implementation
during 2001-2002. The collaborative governance structure coupled with the comprehensive re-
engineering of enterprise IT management based on Y2K and eGovernment successes and
lessons learned will clearly position the Legislature to leverage the State’s IT capabilities as it
considers broad reaching policies for legislative implementation.
Summary of Recommendations and Responses
The BSA’s recommendations are clearly in line with the Davis Administration and DOIT’s
enterprise IT direction. As a result, DOIT prepared the following responses to the BSA recom-
mendations:
BSA Recommendation: To provide strategic guidance for the State’s IT activities, DOIT,
in conjunction with the departments, the governor, the Legislature, the Department of
Finance, and other relevant parties, needs to update the statewide IT plan to address the
current IT environment. In particular, the plan should establish measurable objectives to
show the State intends to reach its goals. Also, the State should consider establishing a
methodology for prioritizing projects for approval and funding.
DOIT Response Summary: In Progress. Updating the Statewide Strategic IT Plan represents
a major element within the Enterprise IT Strategic Planning component of DOIT’s IT Circle of
Life, which tracks the IT technology lifecycle from concept through implementation and on into
maintenance and operations. In March 2001 DOIT convened the CIO Workgroup for Strategic
Planning, launching the development of a new Statewide Strategic IT Plan. This plan reflects the
State of California’s enterprise IT environment, leveraging the current Administration’s successes
in Y2K and eGovernment using current and future IT opportunities and trends. It also focuses on
measurable objectives that enable the State to gauge its implementation progress while serving
to guide IT project approval and funding priorities.
DOIT envisions that the State Strategic IT Plan will offer guidance to Department CIO’s as they
partner with DOIT in developing technology strategies to support their department program
needs. By incorporating those strategies into agency strategic business plans to ensure execu-
tive sponsorship and then rolling them up to the statewide level, the State achieves a holistic
alignment of strategic technology objectives with the Administration’s program priorities.
102
BSA Recommendation: To ensure departments’ IT strategic plans are consistently
evaluated for their compliance with the statewide IT strategy, DOIT should implement a
process to review department plans.
DOIT Response Summary: In Progress. The Agency Information Management Strategy
(AIMS) process represents a major element within the Enterprise IT Strategic Planning compo-
nent of DOIT’s IT Circle of Life. In recognition of this fact, DOIT is reviewing existing Agency
Information Management Strategy (AIMS) policy and procedures in conjunction with the state-
wide strategic IT planning process. DOIT also has begun to pilot a new process for reviewing
department AIMS. Using existing policy as a baseline, this process targets specific enterprise
crosscutting issues, such as eGovernment, to guide the various departments’ strategic IT initia-
tives. DOIT plans to use feedback from this pilot to reengineer current AIMS policy and proce-
dures. This major reengineering effort focuses on partnering Department CIO’s with DOIT in
jointly preparing technology strategies to support statewide and department program needs. By
incorporating those strategies into agency strategic business plans to ensure executive sponsor-
ship and then rolling them up to the statewide level, the State achieves a holistic alignment of
strategic technology objectives with the Administration’s program priorities.
BSA Recommendation: To provide appropriate department guidance and direction
about the IT development process, DOIT should consolidate the various sources of
policy and guidance, remove outdated policies from published documents, and revise
policies as needed to reflect changing state needs. In addition, DOIT should resolve the
contradiction between its management memorandum and the State Administrative
Manual over the applicability of the alternative procurement process.
DOIT Response Summary: In Progress. State IT Policies, Processes and Standards represent
a primary component within DOIT’s IT Circle of Life, supporting all technology lifecycle phases
from concept through implementation and on into maintenance and operations. Therefore, to
establish understanding and buy-in from a diverse set of stakeholders, DOIT employs a “best
practices” collaborative approach, using a series of CIO subcommittees, to vet proposed policies
and procedures before formally publishing them. DOIT chooses this approach owing to the
complexities of California IT governance and the fact that IT policies and practices cannot be
“force fed”. Once proposed policies and procedures are appropriately vetted and approved,
each CIO subcommittee is responsible for consolidating Management Memo and State Adminis-
tration Manual (SAM) content for its assigned IT governance area. This approach will resolve any
misunderstanding by eliminating outdated references and apparent contradiction.
103
BSA Recommendation: DOIT should continue its efforts to improve its project review
and approval process. However, it should ensure that the changes result in a process
that will subject proposed IT projects to a thorough evaluation. Further, DOIT should
ensure that departments are properly assessing IT projects by comparing departments’
feasibility study reports with established criteria, such as the fundamental decision
criteria. Moreover, to ensure that it can defend its approval of costly IT projects, DOIT
should thoroughly document its approval decisions.
DOIT Response Summary: Initial Reengineering Done, Pilot in Progress. IT Project Submittal
and Approval comprises a major component within DOIT’s IT Circle of Life. As a result, DOIT
has taken the leadership role in partnering with its sister control agencies and other department
representatives to develop a new, web-enabled IT Project Submittal and Approval process.
DOIT goals include streamlining project review and approval while at the same time adding
greater rigor to the review process.
Based on industry standards and best practices, as acknowledged by as many as 56 CIO’s, the
new IT Project Submittal and Approval process requires that IT project proposals reflect the nine
Project Management Institute (PMI) project management knowledge areas used to plan and
execute successful IT projects. The process also requires agencies to provide specific program-
matic information to ensure that business objectives are clearly understood and addressed by the
IT project proposal. DOIT is currently piloting its reengineered IT Project Submittal and Approval
process with support from ten departments.
Project information provided during the IT Project Submittal and Approval process will be used to
populate DOIT’s Enterprise Portfolio Management System (EPMS), which serves as the central
repository for all IT Circle of Life components. The redesigned IT Project Submittal and Approval
process provides greater focus on quality planning and sets the stage for ongoing project over-
sight. It also provides the foundation for comprehensive enterprise-wide IT asset management
by supporting the consistency and integrity of the State’s IT asset inventory.
BSA Recommendation: To ensure departments assess and mitigate project risks, DOIT
should require complete risk assessment reports from departments. Further, DOIT
should properly analyze the responses and document how it resolved any concerns.
Finally, DOIT should require departments using the alternative procurement process to
assess risks at the beginning of the project. If DOIT believes its current model is inap-
propriate for alternative procurements, it should modify its new risk model to more
appropriately address alternative procurement.
DOIT Response Summary: Already in Progress. IT Project Submittal and Approval as well as
IT Project Oversight comprise two key components of DOIT’s IT Circle of Life. The IT Project
Submittal and Approval process focuses on the importance and need to fully understand and
address risk mitigation issues, whereas IT Project Oversight demands effective and ongoing risk
management. DOIT’s metrics driven IT project review and approval requires full risk assess-
104
ment reports to accompany all department IT project proposals during the submittal process.
DOIT is in the process of assessing its current risk assessment model (RAM) to ensure it
reflects industry best practices by replacing existing subjective evaluations with more objective
metrics.
DOIT has engaged an industry leader to assist in developing a comprehensive set of project
oversight and risk assessment metrics. Using this material as a base, as well as lessons learned
during Y2K, DOIT plans to implement a revised RAM as part of the IT Project Submittal and
Approval Process. Once the new model is in place, agencies will be required to provide dynamic
and ongoing risk assessment and management by updating the RAM during the various stages
of project development and implementation.
BSA Recommendation: To ensure that it receives and effectively uses the proper infor-
mation to monitor departments’ IT projects, DOIT should take the following actions:
(cid:226)
Continue with its efforts to restructure the oversight process to ensure that the
process allows DOIT to properly monitor and guide projects
(cid:226)
Modify the required progress reports to include a comparison of two types of
critical information: the project’s monthly actual costs and revised estimates of
total projected costs with the budget, and actual and revised projected completion
dates for project phases compared with the original schedule. Use this modified
progress reporting to closely monitor projects that may be required to submit
special project reports.
(cid:226)
Ensure that analysts sufficiently review and document their oversight of projects
and track the receipt of required reports.
1
DOIT Response Summary: Done, On-going. IT Project Oversight and the Special Project
Report represent two critical components of DOIT’s IT Circle of Life. The reengineering of
DOIT’s IT project oversight process and tools includes implementing a web-enabled Early
Warning System that displays crucial project metrics, including key cost and schedule data.
Developed by industry leaders, these metrics are based on project management best practices,
such as the red/yellow/green “traffic light indicators” so effectively used during Y2K, and allow
agencies to report project status regularly while offering DOIT the ability to assess project health.
These metrics also provide an objective link to the Special Project Report process, by which
significant changes to department IT projects are tracked and approved. DOIT and departments
also partner to select and contract with Independent Project Oversight Consultants, who provide
independent and objective project performance assessments.
BSA Recommendation: To hold departments accountable for the benefits expected
from their IT projects, DOIT should ensure that departments submit post implementa-
tion evaluation reports. Further, DOIT should develop a process to promptly review and
evaluate the reports submitted.
105
DOIT Response Summary: In Progress. The Post Implementation Evaluation Report (PIER)
process represents a significant component within the IT Circle of Life. DOIT currently requires
state agencies to submit a PIER following any reportable project implementation. With its re-
e
cently acquired staff increase, DOIT is able to review all project PIER’s submitted by those
agencies. DOIT is revisiting the current PIER process to determine the extent changes are
required to provide more rigorous capture of lessons learned and to build upon best practices,
which can be shared in DOIT newsletters as well as such venues as the Executive Leadership
Forums and CIO biweekly meetings. With the implementation of DOIT’s Enterprise Portfolio
Management System (EPMS), much of the information to be provided within the PIER will
already exist in automated form through previous project planning and oversight processes.
DOIT’s primary goals for the PIER process include updating the State’s IT asset inventory,
feeding objective project performance information into the statewide policy planning process and
showcasing best practices through DOIT’s various communication channels.
BSA Recommendation: To promote coordination on IT projects and avoid redundant
efforts, DOIT should establish a formal mechanism to initiate discussions between
departments that are developing projects based on similar technologies or processes.
To facilitate this coordination and improve project oversight, DOIT should complete its
IT project inventory based on its survey of departments. DOIT should ensure that de-
partments’ reported data is accurate and update this information when departments
report new information so that the project inventory can be current. DOIT also needs to
consider how departments and the Legislature can effectively access this information,
taking into consideration privacy issues and other concerns that may limit the release of
this information.
DOIT Response Summary: In Progress, Priority. DOIT’s Enterprise Portfolio Management
System (EPMS) facilitates the capture of relevant IT project information from concept through
1
implementation and on into maintenance. This web-enabled central repository represents the
State of California IT investment portfolio and IT Asset Management strategy. DOIT is actively
reengineering most of the components in the IT Circle of Life. As each component is imple-
mented, DOIT, agencies and the Legislature will gain access to timely and accurate IT project
and IT asset information, which can be leveraged in making informed IT decisions.
DOIT’s new Maintenance and Operations policies and guidelines have been drafted and are
currently entering their review cycle. DOIT bases its Maintenance and Operations program on
experiences drawn from pilot implementations conducted with selected departments over the
past three years. DOIT anticipates providing guidance to departments in extending objective
performance measures from existing project oversight processes on into the Maintenance and
Operations phase. This practice allows the State to gain more insight into improving program
performance, optimizing existing resources and business processes, and providing feedback into
the ongoing IT planning processes.
106
DOIT’s current IT baseline inventory forms the foundation for statewide IT Asset Management.
It also provides comprehensive baseline information in support of statewide strategic IT plan-
ning. DOIT’s Enterprise Portfolio Management System is designed to support automated and
ongoing refresh of critical Asset Management information.
BSA Recommendation: To improve compatibility and properly guide IT development,
DOIT should expedite its efforts to implement standards by determining which stan-
dards need to be addressed first and focus their efforts accordingly. Further, DOIT
should work with departments to ensure that all necessary standards have been imple-
mented.
r
DOIT Response Summary: Done, On-going. As stated earlier, State IT Policies, Processes
and Standards comprise a major component within the IT Circle of Life. As a result, DOIT’s
process to develop, document and review State IT standards involves full participation of state
and external stakeholders. In addition, DOIT captures lessons learned via the PIER review
process to provide additional standards input. Though time-consuming, this participative process
ensures the successful adoption of full security and infrastructure standards as well as prelimi-
nary drafts of accessibility and eGovernment applications standards. DOIT has also adopted
internal processes and standards to notify agencies when their project proposals involve activi-
ties subject to published DOIT standards.
BSA Recommendation: To ensure that DOIT is fully employing the IT advisory councils
and receiving the benefits intended by law, DOIT should continue to meet with the
private commission and the public committee on a regular basis to guide its strategic
planning efforts, provide input on new policies and ensure that the State follows best
practices. DOIT should ensure the public committee makes all findings and recommen-
dations in writing, as required by state law. DOIT should also monitor the progress of
its CIO work groups to ensure that they reach their established goals.
DOIT Response Summary: Done, Ongoing. DOIT meets with the private commission and the
public committee on a regular basis to guide its strategic planning efforts, receive input on new
policies, and ensure that the State utilizes industry best practices and processes. All the
t
findings and recommendations from these two advisory councils are documented.
BSA Recommendation: To ensure that it completes initiatives, DOIT should establish
timelines and goals for meeting future initiatives. If DOIT does not believe it can com-
plete initiatives within established guidelines, it should communicate its priorities and
resource requirements to the Legislature. In addition, it should notify the Legislature
when changes in the State’s IT environment prompt adjustments to these priorities or
resource requirements.
107
DOIT Response Summary: Done, Ongoing. DOIT, with support from legislative staff, has
developed a realistic timeline for policy development and publication. DOIT will report its
progress to the appropriate legislative staff to meet those commitments and will promptly notify
the Legislature if DOIT needs to readjust priorities or resource requirements due to changing
circumstances. DOIT has also offered to meet with the Legislative Analyst Office and legisla-
tive staff, as needed, to keep them engaged.
BSA Recommendation: To organize and focus its efforts, DOIT should adopt an internal
strategic plan to identify key responsibilities and establish priorities. This plan should
clearly describe how the organization would address its many responsibilities, particu-
larly those that we observed it has not sufficiently accomplished. Further, it should
build on past efforts to the extent possible rather than reinventing processes and prac-
tices when planning its future activities.
y
DOIT Response Summary: Done, Updates Ongoing. DOIT has always operated from an
internal strategic plan. However, as of January 2001 DOIT began drafting a new internal Strate-
gic Business Plan, establishing priorities and key responsibilities to “operationalize” DOIT’s IT
Circle of Life and supporting Enterprise Portfolio Management System. This plan offers a com-
prehensive approach to organizing and addressing DOIT’s multi-faceted responsibilities. How-
ever, rather than building on fragmented and archaic processes and practices of the prior Admin-
istration, DOIT’s current reengineering efforts undertake a more comprehensive and consistent
approach on enterprise crosscutting issues that span the entire technology lifecycle.
Conclusion
Although the BSA recommendations are in line with the Davis Administration and DOIT’s
direction, the BSA’s shift from the original scope of examining the “state’s” IT capabilities to that
of DOIT’s statutory and documentary compliance has greatly diffused the original audit intent.
5
The opportunity to provide an independent perspective about the previous Administration’s
flawed IT practices would undoutedly add value to the Davis Administration’s enterprise IT
initiatives.
Although the Davis Administration and DOIT inherited flawed practices, they managed to
successfully complete several enterprise IT initiatives, i.e., Y2K and eGovernment, while
delivering on many other statewide IT solutions without failures. DOIT’s emerging direction is to
focus on strategic and systemic realignment of IT management infrastructure by establishing
successful programs that streamline IT projects and the relative government services delivery.
Our goal is to raise the bar of accountability for IT project successes, enhance State
government’s ability to exceed the quality expectations of its constituents, and provide solu-
tions that position California for strategic and systemic IT governance.
108
Department of Information Technology Response
to the Bureau of State Audits Report
“Information Technology:
The State Needs to
Improve the Leadership and Management of
Its Information Technology Efforts”
Introduction
DOIT’s mandated responsibilities, as articulated in AB 1686, encompass a daunting task of
extraordinary scale and complexity. The State of California invests anywhere from $2 billion to
$4 billion annually in information technology. Both the number and complexity of State IT
projects are increasing. Managing those projects as separate, independent projects (i.e., in a
stovepipe fashion), is no longer effective to succeed in today’s business environment. More-
over, the fragmented approach exercised by the prior Administration has resulted in numerous
and substantial inefficiencies for the State, including:
(cid:127) Previous large-scale IT failures
(cid:127) Redundancies and duplicated costs in data generation and processing
(cid:127) Cross-agency and department disconnects at the functional and operating levels
(cid:127) An inability to share and leverage investments in information systems and data due to lack
of open standards
(cid:127) A dampened ability to develop and deploy world-class automation to better serve the
citizens and businesses throughout California
Since DOIT was first established, an even greater need has arisen for IT leadership and
oversight in State government. Today, the quantity and complexity of IT projects have grown,
security and privacy issues have captured public attention, and the Internet has become
ubiquitous. Most importantly for the State, eGovernment has emerged from its infancy as a
catalyst for enabling technology that is changing how government programs will work and
provide services in the future. Today, the State of California commits billions of dollars annually
to IT project implementation as well as ongoing systems and infrastructure support. DOIT has
taken an active leadership role in promoting an enterprise IT framework, including architecture,
standards and policies, which upholds the State’s strategic direction for IT implementation and
management. The result is cost savings and avoidance amounting to millions of dollars through
u
architectural consistency and economies of scale. In parallel to its leadership function, DOIT
has enhanced its independent oversight framework to ensure State agencies adopt the poli-
cies, architecture, standards and practices needed for successful planning and implementation
109
of IT projects. In addition to ensuring that taxpayer money is well spent, DOIT also meets the
6
challenge that State agencies have no failed projects. By continuously focusing its oversight
capabilities on State IT projects, DOIT generates significant savings to the State through
prevention or restoration of struggling IT projects. Borrowing successful methodologies from
the private sector, in addition to the body of knowledge related to IT industry best practices,
DOIT has redefined itself, its operating model and vision. Perhaps more importantly, DOIT
Executives have crafted an IT model for the State that has revolutionized the manner in which
services are provided to other state departments and ultimately to the citizens of this State.
Until recently, DOIT’s primary organizational challenge has been one of inadequate staffing.
DOIT was established in 1995 with a total of 15 positions to address the overwhelming dilemma
of the State’s IT problems. Now, DOIT has a total staff of nearly 80 positions to support a
customer base that if treated as a separate country would represent one of the largest econo-
mies in the world. The fact is that, until recently under the current Administration, DOIT did not
have the resources to adequately address the issues required in its authorizing legislation.
The recent Y2K triumph represented an unprecedented achievement in the history of the State
of California, yet it generated an unexpected yet substantial by-product for DOIT and the future
of the state’s information systems. It also served as the catalyst for a dramatic departure from
the dispersed model used by the previous DOIT by positioning and elevating the new DOIT to
deliver quick, internationally recognized, successful initiatives such as eGovernment, Geo-
graphic Information Systems, Enterprise Program Management and effective IT energy man-
agement among others. The Y2K transition was unique in that it unified program managers and
CIO’s alike around a potential disaster of unprecedented proportions. Yet, borrowing exten-
sively from private sector best practices in establishing an Enterprise Portfolio Management
approach, DOIT’s leadership adopted project management best practices while achieving
executive sponsorship at a level previously unattained.
Seizing upon the momentum generated by the Y2K activity and capitalizing on the best prac-
tices that led to its success, DOIT utilized its positive project management methodology to
enhance the management of new IT initiatives that were focused on enhancing state program
services delivery to its customers. DOIT has incorporated this approach into today’s Enterprise
1
Portfolio Management strategy, which provides the framework for DOIT’s leadership and
oversight functions. By transforming best practices into integrated policies that mirror the full
technology lifecycle, DOIT has expanded upon its comprehensive vetting practices and broad
communication channels to maintain stakeholder buy-in and ongoing ownership. DOIT has
raised the bar on IT project oversight and is reforming the framework that all technology
projects will utilize for ensure their successful implementation.
This methodology’s development originated from DOIT’s comprehensive and progressive
project oversight on the first enterprise-level eGovernment initiative, the Department of Motor
Vehicles “DMV Online” project. In fulfilling its leadership role, DOIT elevated the approach for
110
managing complex, crosscutting technology efforts to support this Administration’s efforts in
transforming government services to benefit the people. The best practices stemming from this
enterprise effort enhanced the capability of DOIT’s leadership and oversight roles by enabling
DOIT to expand the support gained from the Y2K Business Council to further hone its project
tracking and monitoring program. Moreover, DOIT engaged industry leaders in oversight and
project management best practices to reinforce its metrics, performance measurement prac-
tices and project management methodology. Oversight best practices based on current and
factual data allow DOIT as an oversight entity to recognize and interpret the dynamics underly-
ing IT project behavior. Such insight contributes toward sound project management and, when
necessary, focused corrective action based on facts rather than guesswork.
This Administration has engaged DOIT in its priority eGovernment initiatives. DOIT has fol-
lowed the Administration’s vision and direction by strategically positioning itself to ensure
successful eGovernment initiatives even as it began its own comprehensive realignment of
internal resources from the previous stovepipe practices to a progressive and proactive leader
in IT management.
i
Governing Magazine duly noted these recent successes by stating, “. . . the state is doing
reasonably well. Statewide IT planning efforts are in place, and most of the larger agencies do
a good job, with a great deal of input from stakeholders. Major project problems in the past
have led to the development of a good project management system, which puts reasonable
constrains on cost and time overruns. Post-implementation audits are done to make sure
projects deliver their promised benefits.” In addition, Governing.com’s “Grading the States 2001:
A Management Report Card” recognized DOIT’s achievements by upgrading its performance
rating to a B-.
Today, with competition from the private sector, the State faces a technology staff recruitment
and retention challenge that is inching upward toward twenty percent. When combined with the
deleterious impact of the existing sunset clause, this statistic casts an ominous shadow over
DOIT’s leadership and oversight program. Nevertheless, this Administration has continued to
offer its vision and executive sponsorship, not only by investing in DOIT but also by engaging
DOIT in a leadership role in all of its successful IT ventures.
A number of compelling reasons exist for DOIT to realign itself from the previous
Administration’s fragmented practices by taking an enterprise-wide, full life cycle approach in its
oversight activities. They include the following:
(cid:127) Ensure fully integrated enterprise solutions instead of “stovepipe” technology
(cid:127) Attain synergy through engaging, collaborating with other departments
(cid:127) Substantiate that all project management methodology ingredients stem from best practices
in the private sector and other government arenas
(cid:127) Verify that needs are program driven while technology serves as an enabler
111
(cid:127) Maintain continuous and rigorous oversight from thought through implementation and
beyond
(cid:127) Assign accountability to the program owner in providing executive sponsorship to ensure
successful IT initiatives
(cid:127) Make sure all stakeholders are at the table to ensure quality solutions are derived through
comprehensive vetting processes
(cid:127) Verify that technology solutions are developed in manageable phases and achieve success
through sound planning
(cid:127) Integrate technology platforms as a key strategy for solutions development rather than
continuing to build islands of information
(cid:127) Utilize a project management methodology that employs objective metrics and measure-
ments to ensure successful IT solutions
1
These objectives comprise critical success factors for DOIT’s Enterprise Portfolio Manage-
ment program. The central theme underlying DOIT’s strategic vision is the successful imple-
mentation of an Enterprise Portfolio Management program that spans the entire statewide
technology lifecycle, more commonly referred to as the IT Circle of Life. As mandated by
Senate Bill 1 (Chapter 508, Statutes of 1995) and Assembly Bill 1686 (Chapter 873, Statutes of
o
1999), DOIT has established, through its IT Baseline Survey, a statewide inventory containing
IT project and infrastructure information across all State agencies. This Asset Management
inventory anchors the starting point of the technology lifecycle and establishes the baseline
against which statewide IT advancement is measured, as directed by the Statewide IT Strate-
gic Plan and Agency Information Management Strategies (AIMS), and guided by DOIT insti-
tuted IT policies and standards. Because the state advances technologically through discrete
and manageable projects, the next step confirms that projects are well conceived, planned and
organized through the project initiation and approval process. Once viable projects have been
set in motion, DOIT focuses on ensuring their successful completion through effective project
oversight, as supported by established project management best practices and rigorous
performance metrics. When necessary, corrective measures are reported, approved and
applied through the Special Project Report process to ensure impacted projects remain on
track. Finally, each project is closed out through the Post Implementation Evaluation Report
process, and the implemented technology enters into the Maintenance and Operation phase,
thus becoming woven into the fabric of the IT Asset Management framework and completing
the full IT Circle of Life.
DOIT’s leadership role promotes an enterprise-wide Information Technology (IT) framework that
includes reengineering existing policy, processes and standards that impact and shape the
management of the State’s IT resources. The IT Circle of Life offers the framework for program
performance measurement, which in turn provides the basis for continuous improvement by
ensuring that all State IT policies, processes, procedures and standards keep pace with
changing technologies while continuing to focus on service delivery.
112
Each IT Circle of Life component collects specific information into a central enterprise reposi-
tory where it can be leveraged by the other components. Partnering with state agencies,
control agencies and the private sector, DOIT is actively evaluating and reengineering each
component using industry best practices and tools to capture information related to IT projects
and assets, as follows:
(cid:127) Enterprise IT Strategic Planning/Agency Information Management Strategy. DOIT
and the CIO Strategic Planning Workgroup have begun the efforts needed to engage and
guide a consultant in developing a Statewide IT Strategic Plan and reengineering the State’s
existing Agency Information Management Strategy (AIMS) policies and procedures to
ensure accountability. This major reengineering effort focuses on DOIT and Department
CIOs’ joint preparation of technology strategies to support statewide and department
program needs. By incorporating those strategies into agency strategic business plans to
ensure executive sponsorship and rolling them up to the statewide level, the State achieves
a holistic alignment of strategic technology objectives with the Administration’s program and
policy priorities.
(cid:127) State IT Policies, Processes and Standards. DOIT and the Enterprise Advisory Council
(formerly known as the CIO Advisory Council) meet biweekly to discuss proposed policies,
processes and standards before finalizing them. Owing to the complexities of California IT
governance and the fact that sound IT policies and practices cannot be “force fed”, DOIT’s
comprehensive vetting process ensures not only the development of sound policy and
procedures but also full buy-in from this diverse set of stakeholders.
(cid:127) IT Project Submittal and Approval. Serving as the linchpin in the IT Circle of Life, DOIT’s
reengineering of the IT project submittal and approval process began almost fifteen months
ago and is now being piloted among ten key departments. DOIT’s objectives are to stream-
line project review and approval while at the same time adding greater rigor to the review
process. Through DOIT’s positive and proactive project management methodology, the
redesigned project submittal and approval process not only provides greater focus on
quality planning but also sets the stage for sound, ongoing project oversight. In addition, the
process provides the foundation for comprehensive enterprise-wide IT asset management
by supporting the consistency and integrity of the State’s IT asset inventory.
(cid:127) Oversight/Early Warning System. Within DOIT’s Enterprise Portfolio Management strat-
egy, the project oversight function forms the basis for DOIT’s web-based early warning
system by providing performance-based project status (metrics). This system uses the
same “traffic light” indicators that proved effective during the Statewide Y2K readiness
effort. In addition, DOIT has begun evaluating a web-enabled tool known as the “Project
Health Indicator”. Also known as the “Project Dashboard”, this tool transforms regularly
updated project oversight metrics into meaningful performance information that will enable
DOIT to provide more effective guidance to problem projects before they have a chance to
get out of control. DOIT’s primary focus is to ensure that project oversight is grounded in
factual project performance data as opposed to the more subjective project status reporting.
113
(cid:127) Special Project Report. Using regularly updated project oversight metrics, DOIT plans to
link the Special Project Report process, by which DOIT tracks and approves significant
changes to department IT projects, directly to the Oversight/Early Warning System. Such
an approach introduces objectivity into the change management process by basing project
planning enhancements or modification on firm, factual data. Even so, DOIT anticipates
that given the emphasis on up front quality planning and oversight, the future trend will be
fewer SPR’s.
(cid:127) Post Implementation and Evaluation Report (PIER). DOIT is revisiting the current
process to determine the extent changes are required to capture lessons learned and build
upon best practices. With the implementation of DOIT’s Enterprise Portfolio Management
System, much of the information to be provided within the PIER will already exist in auto-
mated form through previous project planning and oversight. DOIT’s primary goal of the
PIER process becomes one of feeding objective project performance information into the
statewide policy planning process and showcasing best practices through newsletters and
such venues as the Executive Leadership Forum. Project financial and programmatic
outcomes will continue to be reviewed by the Department of Finance.
(cid:127) Maintenance and Operations. The new Maintenance and Operations policies and guide-
lines have been drafted and are currently starting their review cycle. The DOIT Mainte-
nance and Operations program is based on experiences drawn from pilot implementations
with selected departments conducted over the past three years. DOIT expects to provide
guidance to departments in extending objective performance measures from existing
project oversight processes on into the Maintenance and Operations phase. This practice
allows the State to gain more insight into improving program performance as well as opti-
mizing existing resources and business processes, thus providing feedback into the
ongoing IT planning process.
o
(cid:127) Asset Management. The current IT baseline inventory is the foundation for Asset Manage-
ment and provides comprehensive baseline information that supports strategic IT planning.
The Enterprise Portfolio Management System provides the basis for automated and ongo-
ing updates to critical Asset Management information.
As each IT Circle of Life component is implemented, the State of California improves its ability
to manage its IT investments at an enterprise level. Some of the benefits include:
(cid:127) Incorporation of industry best practices into DOIT’s leadership, guidance and oversight
activities. Such best practices include project management, performance metrics, lessons
learned, and enterprise architecture and standards.
(cid:127) Sharing of enterprise-level information to help state officials make better informed IT deci-
sions
(cid:127) Clearer and more objective IT management performance indicators
114
(cid:127) Central on-line capability to track IT projects from concept through implementation and on
into maintenance
(cid:127) Ability to save millions of taxpayer dollars in implementing IT solutions by reducing licensing
costs, leveraging IT training, sharing project management knowledge, reducing outdated
technology costs, etc.
(cid:127) Centralized enterprise database containing all IT project costs and other historical informa-
tion
(cid:127) Ability to track departments’ compliance with State policy, process and procedures
(cid:127) Ability to collect project information for all delegated projects
(cid:127) Availability of a single information source for control agencies to review and approve IT
project proposals.
(cid:127) Statewide adherence to standard acquisition and procurement processes
(cid:127) Ability to ensure cost-effective, efficient, and reliable processes are deployed in a timely
manner, thereby saving departments time and resources presently expended on outdated
processes
(cid:127) Capability to centrally monitor IT project status to ensure IT project success
The following represent major recent accomplishments by DOIT:
(cid:1) The Department of Information Technology (DOIT) led California through a successful Year
2000 (Y2K) transition.
(cid:1) In its oversight role DOIT has published new policy on IT Project Oversight.
(cid:1) Initiated the reengineering of the Feasibility Study Report Process.
(cid:1) Piloted the Project Registration System with 13 departments to identify the level of detail
information needed to adequately track IT projects.
(cid:1) Engaged a leading consultant firm and established a workgroup of State IT professionals to
develop IT project management metrics to accurately gauge achieved and sustained
project performance.
(cid:1) Developed an IT Baseline Survey to gather the most current information on all IT projects
and on-going maintenance efforts.
(cid:1) Established a partnership with the Project Management Institute and State project manage-
ment professionals to adopt the Project Management Body of Knowledge (PMBOK) as a
guideline on IT project management.
(cid:1) Developed a process for standards development and maintenance for the Statewide
Technical Architecture and Standards, and drafted comprehensive standards for
eGovernment systems.
(cid:1) Established an Acquisition Policy and Oversight Division within DOIT.
(cid:1) Established a formal partnership with the Department of General Services’ Procurement
Division to identify acquisition policy and process improvements.
115
(cid:1) Initiated review of opportunities for consolidated purchase of software licenses to reduce
costs to the State.
(cid:1) Developed an Operational Recovery Program to provide guidance to State agencies on
how to prepare for and respond to the damage or destruction of critical IT systems.
(cid:1) Sponsored a Geographical Information Systems forum to raise awareness of how this
technology can be used to more effectively deliver programs.
(cid:1) Established a Chief Information Officer (CIO) Advisory Council to foster Statewide collabo-
ration, provide advice on technology directions and assist DOIT with its ‘go forward’ strat-
egy.
(cid:1) Established a Strategic Planning Division within DOIT to develop, implement and maintain a
comprehensive program to govern and facilitate IT planning.
(cid:1) Collaborated with DPA and established a task force to develop and implement solutions to
the longstanding IT recruitment and retention issues.
(cid:1) Established a Statewide IT Recruitment and Retention Section within DOIT to address the
recruitment and retention of IT professionals on a Statewide basis.
(cid:1) Initiated bi-weekly CIO Meetings. Through these meetings DOIT has fostered Statewide
strategic planning, enterprise solutions and change management among State IT and
business professionals.
(cid:1) Co-sponsored technology leadership events (i.e. the Executive Leadership Forums, Quar-
terly Supplier Forums, Information Security Forums, and Energy Forums). These forums
have successfully contributed to improved private-public cooperation, understanding of
emerging technologies, and communication among all technology stakeholders.
116
Summary of Recommendations and Responses
The BSA’s recommendations are clearly in line with the Davis Administration and DOIT’s
enterprise IT direction. As a result, DOIT prepare the following responses to the BSA recom-
mendations:
BSA Recommendation: To provide strategic guidance for the State’s IT activities, DOIT,
in conjunction with the departments, the governor, the Legislature, the Department of
Finance, and other relevant parties, needs to update the statewide IT plan to address the
current IT environment. In particular, the plan should establish measurable objectives to
show the State intends to reach its goals. Also, the State should consider establishing a
methodology for prioritizing projects for approval and funding.
DOIT Response Summary: In Progress. Updating the Statewide Strategic IT Plan represents
a major element within the Enterprise IT Strategic Planning component of DOIT’s IT Circle of
Life, which tracks the IT technology lifecycle from concept through implementation and on into
maintenance and operations. In March 2001 DOIT convened the CIO Workgroup for Strategic
Planning, launching the development of a new Statewide Strategic IT Plan. This plan reflects
the State of California’s enterprise IT environment, leveraging the current Administration’s
successes in Y2K and eGovernment using current and future IT opportunities and trends. It
also focuses on measurable objectives that enable the State to gauge its implementation
progress while serving to guide IT project approval and funding priorities.
DOIT envisions that the State Strategic IT Plan will offer guidance to Department CIO’s as they
partner with DOIT in developing technology strategies to support their department program
needs. By incorporating those strategies into agency strategic business plans to ensure
executive sponsorship and then rolling them up to the statewide level, the State achieves a
holistic alignment of strategic technology objectives with the Administration’s program priorities.
Detailed Response: In March 2001 DOIT organized and convened the CIO Workgroup for
Strategic Planning and began creating the new Statewide Strategic IT Plan. Meeting weekly,
this key workgroup created a project charter and drafted a Statement of Work to acquire
specialized contractor services to develop the Statewide Strategic IT Plan and publish a
Statewide Strategic IT Planning methodology.
Reflecting the State of California’s enterprise IT environment, this plan leverages the current
Administration’s successes in Y2K and eGovernment. The scope of work covers recent
technology advances and crosscutting enterprise strategic issues, such as eGovernment,
Geographic Information Systems (GIS) and the Health Improvement Portability and Account-
ability Act (HIPAA). It also addresses statewide priorities for technology implementation. In
addition to documenting the current IT environment as well as technology advances, issues
and standards, this plan establishes measurable objectives that enable the State to gauge its
progress in key areas. At the same time, it serves as a guide for prioritizing IT project approval
and funding.
117
Moreover, DOIT expects to work closely with the Governor, the Legislature, the Department of
Finance and the Office of EGovernment to ensure technology opportunities support their
collaborative efforts in defining a statewide strategic vision for government programs and
services. Serving as the appropriate driver for the Statewide Strategic IT Plan, this vision
addresses three key elements: 1) statewide business process reengineering; 2) eGovernment
blueprint and priorities; and, 3) major program and policy issues. These elements are essential
in enabling DOIT to create a comprehensive Statewide IT Strategic Plan that supports this
Administration’s priorities.
Such a statewide strategic planning framework also enables the State to:
(cid:127) Define statewide strategic issues
(cid:127) Establish measurable strategic performance objectives
(cid:127) Provide the basis to prioritize projects at the state level
(cid:127) Serve as a yardstick when reviewing agency strategic plans
(cid:127) Identify and address crosscutting enterprise issues
To supplement the statewide strategic planning framework, the Strategic Planning Workgroup is
using the strategic direction set forth in Governor Davis’ 2001 “State of the State Address.”
Additionally, the team works closely with the Governor’s Office on Innovation in Government
and the Director of eGovernment in reviewing and synthesizing material from individual agency
Strategic Business Plans to extract common themes and crosscutting issues supported by
technology advances.
Meanwhile, Project Review and Oversight staff scrutinize project proposal and planning efforts
to ensure they address current crosscutting enterprise issues and initiatives, such as
eGovernment, GIS and HIPAA. Similarly, Technology and Infrastructure staff review project
planning documents to ensure the proposed technology infrastructure considers critical IT
issues and advances.
BSA Recommendation: To ensure departments’ IT strategic plans are consistently
evaluated for their compliance with the statewide IT strategy, DOIT should implement a
process to review department plans.
DOIT Response Summary: In Progress. The Agency Information Management Strategy
(AIMS) process represents a major element within the Enterprise IT Strategic Planning compo-
nent of DOIT’s IT Circle of Life. In recognition of this fact, DOIT is reviewing existing Agency
Information Management Strategy policy and procedures in conjunction with the statewide
strategic IT planning process. DOIT also has begun to pilot a new process for reviewing depart-
ment AIMS. Using existing policy as a baseline, this process targets specific enterprise crosscut-
ting issues, such as eGovernment and the Health Insurance Portability and Accountability Act
(HIPAA), to guide the various departments’ strategic IT initiatives. DOIT plans to use feedback
from this pilot to reengineer current AIMS policy and procedures. This major reengineering effort
118
focuses on partnering Department CIO’s with DOIT in jointly preparing technology strategies to
support statewide and department program needs. By incorporating those strategies into
agency strategic business plans to ensure executive sponsorship and then rolling them up to
the statewide level, the State achieves a holistic alignment of strategic technology objectives
with the Administration’s program priorities.
Detailed Response: In January 2001, DOIT began reviewing existing AIMS policy and proce-
dures in conjunction with the statewide strategic IT planning process to ensure they support
each individual department’s strategic IT objectives as well as those of the State as a whole.
First, DOIT drafted a new AIMS review process based on existing policy, as published in the
State Administrative Manual (SAM), and modified it to address specific crosscutting issues
such as eGovernment. Using the first AIMS documents to arrive in May 2001, DOIT began
piloting this process.
DOIT plans to continue evaluating this process as agencies submit their AIMS documents or
AIMS updates through September 2001. DOIT plans to utilize information gathered during this
period and feedback received through the CIO Strategic Planning Workgroup, to reengineer
existing AIMS policy and internal DOIT review procedures. DOIT targets the policy release in
early 2002. The Statewide Strategic IT Plan publication, revised policies and revised proce-
dures will fully support agency strategic IT planning during the 2002/03 planning cycle.
Meanwhile DOIT continues to review projects initiated through the FSR process to ensure their
consistency with agency strategic IT planning objectives and statewide strategic business
issues. The BSA asserts that DOIT has not consistently reviewed and approved the strategic
plans for departments’ IT projects. This practice was adhered to by the former Administration
owing to lack of appropriate staffing. Now, with sufficient staff on board, DOIT not only has
p
reviewed all AIMS documents submitted thus far during the 2001/02 planning cycle but is also
using its review effort as a primary basis for reengineering the existing AIMS process.
BSA Recommendation: To provide appropriate department guidance and direction
about the IT development process, DOIT should consolidate the various sources of
policy and guidance, remove outdated policies from published documents, and revise
policies as needed to reflect changing state needs. In addition, DOIT should resolve the
contradiction between its management memorandum and the State Administrative
Manual over the applicability of the alternative procurement process.
DOIT Response Summary: In Progress. State IT Policies, Processes and Standards repre-
sent a primary component within DOIT’s IT Circle of Life, supporting all technology lifecycle
phases from concept through implementation and on into maintenance and operations. There-
fore, to establish understanding and buy-in from a diverse set of stakeholders, DOIT employs a
“best practices” collaborative approach, using a series of CIO subcommittees, to vet proposed
119
policies and procedures before formally publishing them. DOIT chooses this approach owing
to the complexities of California IT governance and the fact that IT policies and practices
cannot be “force fed”. Once proposed policies and procedures are appropriately vetted and
approved, each CIO subcommittee is responsible for consolidating Management Memo and
State Administration Manual (SAM) content for its assigned IT governance area. This approach
will resolve any misunderstanding by eliminating outdated references and apparent contradiction.
Detailed Response: DOIT is taking the leadership role in engaging the Agency Information
Officers (AIO), agency CIO’s, control agencies, local government and the private sector in
developing policies, processes and standards to align the State’s technology tools and ser-
vices with its current business needs. The current administration uses an industry “best
practices” collaborative approach in which DOIT plays a leadership role in working with a
variety of state CIO Workgroups to develop, support and implement new policies, processes
and standards that are enterprise-wide in nature. The CIO input and support is critical to
successful and timely implementation.
The private sector (California Information Technology Council) also has the opportunity to
review proposed policies, processes and standards to validate the purpose and value of the
proposed changes before they become final. This process was extremely successful during
the state Y2K effort and has proven itself in the development of eGovernment standards and
most recently in the development of the IT Project Submittal and Approval Process, which
replaces the existing Feasibility Study Report process.
DOIT also conducts pilots, another industry best practice, to refine the final product. The pilot
tests the proposed model – which includes policy, processes, standards and tools – to ensure
all components meet their stated objectives before DOIT applies them on an enterprise basis.
This approach reduces confusion and ensures successful change management.
Currently DOIT provides state departments IT guidance by issuing policies via Management
Memos, which are later incorporated into the State Administrative Manual (SAM). The State
Information Management Manual (SIMM) provides guidance on how to apply the policy; there-
fore SAM and SIMM complement each other without representing a duplication of effort. Fi-
nally, IT Directives are used to clarify existing policies and/or standards.
DOIT will update SAM and SIMM once the policies have been properly vetted and piloted.
DOIT will revise all corresponding sections of SAM and SIMM as each IT Circle of Life compo-
nent is reengineered.
DOIT agrees with BSA that some inconsistencies exist among Management Memos, SAM and
SIMM. Such inconsistencies occur when DOIT Management Memos rescind existing policy or
processes, yet the old policy or process is not physically removed from SAM. This minor
paperwork issue does not imply in any way that DOIT is shirking its responsibility of providing
120
necessary guidance to the departments. Rather, DOIT works with the CIO’s to develop, vet
and pilot many IT policies and procedures before formally issuing them by means of Manage-
ment Memo, SAM or SIMM. This practice reduces confusion and misunderstanding while
expediting the implementation and acceptance process for new policies. Departments are well
aware of this practice because many participate in the pilot effort while others are informed in
the biweekly CIO Meetings. When departments do have questions regarding proposed policy
or procedures, they typically contact DOIT for clarification and direction.
DOIT has established a DOIT Policy Committee to take an enterprise view of its policies,
processes and standards. The Policy Committee chair is the Enterprise Services Division
Deputy and includes the DOIT CIO Workgroup Sponsors (i.e., the DOIT executive responsible
for the program area). The Policy Committee function is to coordinate the development and
tracking of all new policy, processes and standards to ensure they meet the established
timeframes for publication. The IT Circle of Life State IT Policies, Processes and Standards
component begins its reengineering efforts by analyzing existing policies, processes and
standards to determine which ones are outdated and which ones will be replaced or removed.
The Policy Committee Chair is also the Chair for the CIO Advisory Council, which includes the
CIO Workgroup Leads, the DOIT CIO Workgroup Sponsors and the Agency Information
Officers. The CIO Advisory Council along with DOIT’s sister control agencies will comprise the
vetting group for all proposed policy and standards before the proposed policy or standard is
sent to the Governor’s Office for approval.
As BSA notes in its report, DOIT maintains that the issuance of policy in 1998 requiring the use
of alternative procurements indicates that the previous Administration had completed its as-
sessment of that process in accordance with SAM Section 5215. However, DOIT, the Depart-
ment of General Services and the Department of Finance are currently collaborating on addi-
tional refinements to the alternative procurement process, including changes to the existing IT
project submittal and approval activities associated with both planning and procurement, SAM
Section 5215, previously issued DOIT policies and procedures, and Department of Finance
Budget Letters. DOIT anticipates these changes will resolve any misunderstanding that may
currently exist and further institutionalize the use of a procurement process that has received
strong support from both the Administration and the Legislature.
BSA Recommendation: DOIT should continue its efforts to improve its project review
and approval process. However, it should ensure that the changes result in a process
that will subject proposed IT projects to a thorough evaluation. Further, DOIT should
ensure that departments are properly assessing IT projects by comparing departments’
feasibility study reports with established criteria, such as the fundamental decision
criteria. Moreover, to ensure that it can defend its approval of costly IT projects, DOIT
should thoroughly document its approval decisions.
121
DOIT Response Summary: Initial Reengineering Done, Pilot in Progress. IT Project Submittal
and Approval comprises a major component within DOIT’s IT Circle of Life. As a result, DOIT
has taken the leadership role in partnering with its sister control agencies and other department
representatives to develop a new, web-enabled IT Project Submittal and Approval process.
DOIT goals include streamlining project review and approval while at the same time adding
greater rigor to the review process.
Based on industry standards and best practices, as acknowledged by as many as 56 CIO’s,
the new IT Project Submittal and Approval process requires that IT project proposals reflect the
nine Project Management Institute (PMI) project management knowledge areas used to plan
and execute successful IT projects. The process also requires agencies to provide specific
programmatic information to ensure that business objectives are clearly understood and ad-
dressed by the IT project proposal. DOIT is currently piloting its reengineered IT Project
Submittal and Approval process with support from ten departments.
Project information provided during the IT Project Submittal and Approval process will be used
to populate DOIT’s Enterprise Portfolio Management System (EPMS), which serves as the
central repository for all IT Circle of Life components. The redesigned IT Project Submittal and
Approval process provides greater focus on quality planning and sets the stage for ongoing
project oversight. It also provides the foundation for comprehensive enterprise-wide IT asset
management by supporting the consistency and integrity of the State’s IT asset inventory.
Detailed Response: DOIT is committed to implementing the IT Circle of Life as one of its
highest priorities. The IT Project Submittal and Approval Process is the first component to
reach the pilot stage, with others to follow. The use of industry best practices in the IT Project
Submittal and Approval Process sets the standard for incorporating industry proven best
practices, such as those published in the PMI’s Project Management Body of Knowledge
(PMBOK) in the area of project management, risk management, quality, communication, acqui-
sition planning, performance metrics and project tracking. DOIT will continue to solicit the
assistance of agency CIO’s, local government entities and private sector participants to ensure
that only proven and beneficial best practices are incorporated into the State’s IT processes.
As each component of the IT Circle of Life is reengineered, DOIT must also reengineer its
internal processes to support the new processes. As a result, DOIT is currently revising its
project review and approval procedures to support the newly developed IT Project Submittal
and Approval Process and to ensure complete documentation is available on the disposition of
all IT project proposals submitted to DOIT. DOIT continues to provide agencies with the oppor-
tunity to discuss their plans related to new IT projects before submitting a formal IT project
proposal. This concept phase allows the agencies to gain valuable input on their proposed
projects prior to formal submittal.
122
DOIT would like to note, however, that even though BSA states they reviewed ten projects
w
approved by the Administration, this is not a representative sample of the number of projects
submitted for DOIT review. Moreover, the ten projects referenced were reviewed under proce-
dures inherited from the previous Administration. At present, DOIT regularly reviews between
200 and 300 project documents per year and conducts a thorough analysis of each document
that is submitted. This analysis generally includes requests for additional information and
clarification from the departments, as well as multiple subsequent meetings with the depart-
ments and the Department of Finance, often requiring submittal of revised documents. DOIT
maintains that these activities, along with the presence of document support letters that specifi-
a
cally reference the Administration’s conditions of approval, are evidence of the completed
analysis.
BSA Recommendation: To ensure departments assess and mitigate project risks, DOIT
should require complete risk assessment reports from departments. Further, DOIT
should properly analyze the responses and document how it resolved any concerns.
Finally, DOIT should require departments using the alternative procurement process to
assess risks at the beginning of the project. If DOIT believes its current model is inap-
propriate for alternative procurements, it should modify its new risk model to more
appropriately address alternative procurement.
DOIT Response Summary: Already in Progress. IT Project Submittal and Approval as well
as IT Project Oversight comprise two key components of DOIT’s IT Circle of Life. The IT
Project Submittal and Approval process focuses on the importance and need to fully under-
stand and address risk mitigation issues, whereas IT Project Oversight demands effective and
ongoing risk management. DOIT’s metrics driven IT project review and approval requires full
risk assessment reports to accompany all department IT project proposals during the submittal
process. DOIT is in the process of assessing its current risk assessment model (RAM) to
ensure it reflects industry best practices by replacing existing subjective evaluations with more
objective metrics.
DOIT has engaged an industry leader to assist in developing a comprehensive set of project
oversight and risk assessment metrics. Using this material as a base, as well as lessons
learned during Y2K, DOIT plans to implement a revised RAM as part of the IT Project Submittal
and Approval Process. Once the new model is in place, agencies will be required to provide
dynamic and ongoing risk assessment and management by updating the RAM during the
various stages of project development and implementation.
Detailed Response: DOIT concurs that each IT project proposal must include a complete risk
assessment report, which must be rigorously evaluated as part of the project review and
approval process. Moreover, DOIT maintains that agencies must complete risk analyses that
are consistent with and applicable to the specific IT projects proposed, and that DOIT must
evaluate the results using the same criteria. For instance, some existing RAM questions may
not apply to all project types (e.g., questions about system implementation, when the proposal
seeks approval for hardware replacement), whereas some may apply to a subsequent project
phase and provide little to no value during the IT Project Submittal and Approval Process (e.g.,
123
questions regarding specific IT development teams, where the proposal seeks approval for a
planning effort).
Recognizing the importance of risk assessment and the need to continuously improve project
review processes, DOIT has included, as part of the IT Project Submittal and Approval Pro-
cess, the requirement for agencies to prepare and maintain comprehensive risk management
plans, which include risk identification, assessment, mitigation and response activities.
DOIT recognizes the importance of having a tool that transforms project progress information
into meaningful measures, which provide department directors, CIO’s and project managers
with valuable project status information and pinpoint areas where potential problems can arise.
DOIT is in the process of implementing such a tool called the “Project Health Indicator.” By
graphically displaying crucial measurement data in a variety of chart formats, this web-enabled
tool allows department directors, CIO’s and project managers to identify areas of concern
related to a specific project. Because of its component-based architecture and its metrics
hierarchy, the Project Health Indicator can “zoom-in” to several levels of detail to assist project
managers in isolating potential areas of concern. The Project Health Indicator tracks both
positive and negative project performance trends, alerting the project manager when estab-
lished thresholds are exceeded.
DOIT’s Oversight and Early Warning System component within the IT Circle of Life will include
the Project Health Indicator component to assist DOIT oversight staff in tracking IT project
status.
The BSA notes that, although DOIT received risk assessment summary reports for 9 of the 10
projects reviewed, it received sufficient information to evaluate the risk-planning efforts of only
3 projects. Once again, DOIT would like to point out that these 10 projects were reviewed
s
using procedures inherited from the prior Administration. DOIT’s current review process
ensures that each assessment responds to all questions in accordance with the type of project
being proposed. Moreover, DOIT’s review process ensures that each response is consistent
with the project lifecycle phase represented.
BSA Recommendation: To ensure that it receives and effectively uses the proper infor-
mation to monitor departments’ IT projects, DOIT should take the following actions:
(cid:127) Continue with its efforts to restructure the oversight process to ensure that the
process allows DOIT to properly monitor and guide projects
(cid:127) Modify the required progress reports to include a comparison of two types of critical
information: the project’s monthly actual costs and revised estimates of total pro-
jected costs with the budget, and actual and revised projected completion dates for
project phases compared with the original schedule. Use this modified progress
reporting to closely monitor projects that may be required to submit special project
reports.
124
(cid:127) Ensure that analysts sufficiently review and document their oversight of projects
and track the receipt of required reports.
1
DOIT Response Summary: Done, On-going. IT Project Oversight and the Special Project
Report represent two critical components of DOIT’s IT Circle of Life. The reengineering of
DOIT’s IT project oversight process and tools includes implementing a web-enabled Early
Warning System that displays crucial project metrics, including key cost and schedule data.
Developed by industry leaders, these metrics are based on project management best prac-
tices, such as the red/yellow/green “traffic light indicators” so effectively used during Y2K, and
allow agencies to report project status regularly while offering DOIT the ability to assess
project health. These metrics also provide an objective link to the Special Project Report
process, by which significant changes to department IT projects are tracked and approved.
DOIT and departments also partner to select and contract with Independent Project Oversight
Consultants, who provide independent and objective project performance assessments.
Detailed Response: As indicated by the BSA, DOIT has begun to reengineer its project
oversight processes and tools. Specifically, DOIT is in the process of implementing a web-
enabled Early Warning System that allows department directors, CIO’s, project managers and
DOIT to quickly and clearly monitor the status of their IT projects. This system graphically
displays crucial performance measures in a variety of chart formats. DOIT’s new oversight
program includes the two metrics (cost and schedule) recommended by BSA, as well as many
other performance measures. Because of its component-based architecture and its metrics
hierarchy, this system can “zoom in” on all levels of detail for any metric. This ability to isolate
areas of potential concern helps project managers keep their projects on course while allowing
DOIT to provide appropriate monitoring and guidance.
Project oversight is a key element of DOIT’s Enterprise Portfolio Management (EPM) strategy,
which spans the entire statewide technology lifecycle. Once viable projects are set in motion
(through the project review and approval process), DOIT focuses on ensuring their successful
completion through effective project oversight, as supported by the Project Management
Institute’s best practices and objective performance metrics. The Oversight/Early Warning
System component provides a mechanism for departments to report project status on a regular
basis while offering the ability to evaluate project health.
Successful oversight of complex IT projects requires collection and analysis of metrics that
span various phases of the project. Metrics based on project management best practices are
essential to their success. Projects will be evaluated based on metrics that have been col-
lected in the following major categories: Project Initiation, Time Management, Scope Manage-
ment, Human Resource Management, Cost Management, Procurement Management, Commu-
nication Management, Risk Management, Quality Management and Project Completion. These
metrics along with the Early Warning System raise the bar on accountability for IT project
successes and enhance DOIT’s ability to provide oversight on all IT projects statewide.
125
As part of its oversight role, DOIT participates in Executive Steering Committees to work
collaboratively on various oversight issues pertaining to IT projects. The committees meet
monthly and on an ad hoc basis to discuss project issues, review the results of oversight
activities and assess project risks and changes. In addition to participating on the Executive
Steering Committee, DOIT oversight activities include:
(cid:127) Reviewing monthly status reports for each IT project
(cid:127) Reviewing specified deliverables produced during project design and development
(cid:127) Attending meetings where project risks and risk mitigation measures are discussed in
depth
(cid:127) Participating with appropriate State executives in resolving sensitive issues encountered on
various projects
(cid:127) Reporting project status from a statewide perspective and providing recommendations for
project performance enhancement
DOIT also monitors department project management activities to ensure compliance with state-
level information technology policies and standards. Through such monitoring, DOIT provides
guidance and leadership to ensure that IT projects proceed in accordance with the approved
project plan and budget.
In keeping with best practices, effective oversight of IT activities provides value to state pro-
grams and the constituencies they serve. Therefore, DOIT partners with departments to jointly
develop Statements of Work and select Independent Project Oversight Consultants (IPOC) to
perform independent oversight on IT projects. Each Statement of Work requires oversight
contractors to submit all project reports to DOIT and the departments concurrently. DOIT
reviews these reports and utilizes the information to evaluate, monitor and report the project’s
health. The IPOC activities and the information they are expected to provide are listed below:
Performance Monitoring
(cid:127) Schedule and progress (e.g., “Are milestone/deliverable dates being met?”)
(cid:127) Resources and cost (e.g., “How do resource expenditures compare to plan?”)
(cid:127) Requirements growth and stability (e.g., “Are new requirements/change orders causing the
overall size of the system to grow?”)
(cid:127) Product quality (e.g., “Are deliverables sufficiently detailed, complete, accurate and trace-
able to system requirements?”)
(cid:127) Technical adequacy (e.g., “Will the proposed hardware and software provide sufficient
capacity to meet operational performance requirements at full load?”)
Performance Metrics Evaluation
(cid:127) Actual effort expended compared to planned effort
(cid:127) Actual delivery dates compared to planned delivery dates
126
(cid:127) Actual acceptance/approval dates (for each deliverable) compared to planned delivery
dates
(cid:127) Deliverable review times and deliverable review results
(cid:127) Key staff experience compared to proposed experience
(cid:127) Key staff turnover compared to industry standards/averages
Deliverables Review
(cid:127) Technical architecture deliverables, performance modeling and benchmark results, and any
other contractor work products bearing upon issues of technical adequacy
(cid:127) Review and comparison of functionality specified in the scope of work to actual product
functionality delivered
(cid:127) Functional specifications and test plans
Contract Management Monitoring
(cid:127) Contractor and State compliance with applicable contract terms and conditions
(cid:127) Contractor and State adherence to project scope definition
(cid:127) State response to contractor performance issues (if any)
(cid:127) Change order processing
Risk Management
(cid:127) Risk identification, evaluation, tracking and mitigation
(cid:127) Risk reporting and escalation within the stakeholder organizations
(cid:127) Risk profiling for funding/oversight entities
(cid:127) Independent “point-in-time” assessments of project activities to validate thoroughness of
risk identification efforts
DOIT maintains regular communication with Independent Project Oversight Consultant (IPOC)
vendors and uses their progress reports to detect problems and be more proactive in dealing
with troubled projects.
An IPOC was required for the Department of Transportation’s (DOT) ATCAS project as a result
of a Special Project Report (SPR) that was submitted to DOIT in August of 2000. Since that
date, the DOT and the IPOC have met all reporting requirements. The IPOC has been provid-
ing monthly reports, directly to DOIT, identifying the progress, project document/task reviews,
risks encountered with related mitigations, overall project status, as well any recommendations.
Previous administration only required periodic progress reports, which were due at specific
milestones. This practice is no longer in place at DOIT. DOIT reviews department monthly
progress reports, as well as the IPOC’s reports to evaluate, monitor and report the status of
every project.
BSA Recommendation: To hold departments accountable for the benefits expected
from their IT projects, DOIT should ensure that departments submit post implementation
evaluation reports. Further, DOIT should develop a process to promptly review and
evaluate the reports submitted.
127
DOIT Response Summary: In Progress. The Post Implementation Evaluation Report (PIER)
process represents a significant component within the IT Circle of Life. DOIT currently requires
state agencies to submit a PIER following any reportable project implementation. With its re-
e
cently acquired staff increase, DOIT is able to review all project PIER’s submitted by those
agencies. DOIT is revisiting the current PIER process to determine the extent changes are
required to provide more rigorous capture of lessons learned and to build upon best practices,
which can be shared in DOIT newsletters as well as such venues as the Executive Leadership
Forums and CIO biweekly meetings. With the implementation of DOIT’s Enterprise Portfolio
Management System (EPMS), much of the information to be provided within the PIER will
already exist in automated form through previous project planning and oversight processes.
DOIT’s primary goals for the PIER process include updating the State’s IT asset inventory,
feeding objective project performance information into the statewide policy planning process
and showcasing best practices through DOIT’s various communication channels.
Detailed Response: The State Administrative Manual (SAM) section 4947 requires that
agencies submit a Post Implementation Evaluation Report (PIER) following the completion of
each information technology project. Accordingly, DOIT requires that state agencies submit a
PIER following implementation of any reportable project. Now that DOIT is adequately staffed,
it has begun reviewing PIER’s and additional reviews are in progress.
DOIT plans to reengineer and further enhance the PIER policy and processes as part of the IT
Circle of Life. The PIER process that was inherited from the Department of Finance, Office of
Information Technology, was largely fiscal-based and did not include any evaluation of industry
best practices more appropriate to DOIT’s role. The reengineered PIER process will provide
the ability to leverage lessons learned, populate the IT asset inventory to allow for enterprise
level licensing and capture information with which to update the State’s IT inventory. It will also
provide for historical and statistical information to assist in more accurately estimating project
duration and cost.
According to the BSA, DOIT’s records show that it received roughly 87 PIER’s from depart-
ments since 1996 yet offer no evidence that it analyzed any of the 87 reports received. The
BSA also cites a claim made by the Legislative Analyst Office that there could have been more
than 400 completed IT projects for which departments did not submit evaluation reports. DOIT
e
would like to point out that these 87 PIER’s were reviewed using procedures inherited from the
prior Administration. Moreover, previous Administration practices did not provide for enforce-
ment of PIER submittals. Now that DOIT has received the staffing necessary to perform
comprehensive review and oversight, it plans to address these deficiencies in reengineering
and enhancing the PIER policy and processes. Meanwhile, DOIT Project Review and Over-
sight staff continue to review PIER’s submitted in accordance with existing practices.
128
Maintenance and Operations, and IT Asset Management, comprise the remaining two compo-
nents of DOIT’s IT Circle of Life.
BSA Recommendation: To promote coordination on IT projects and avoid redundant
efforts, DOIT should establish a formal mechanism to initiate discussions between
departments that are developing projects based on similar technologies or processes.
To facilitate this coordination and improve project oversight, DOIT should complete its
IT project inventory based on its survey of departments. DOIT should ensure that de-
partments’ reported data is accurate and update this information when departments
report new information so that the project inventory can be current. DOIT also needs to
consider how departments and the Legislature can effectively access this information,
taking into consideration privacy issues and other concerns that may limit the release of
this information.
DOIT Response Summary: In Progress, Priority. DOIT’s Enterprise Portfolio Management
System (EPMS) facilitates the capture of relevant IT project information from concept through
1
implementation and on into maintenance. This web-enabled central repository represents the
State of California IT investment portfolio and IT Asset Management strategy. DOIT is actively
reengineering most of the components in the IT Circle of Life. As each component is imple-
mented, DOIT, agencies and the Legislature will gain access to timely and accurate IT project
and IT asset information, which can be leveraged in making informed IT decisions.
DOIT’s new Maintenance and Operations policies and guidelines have been drafted and are
currently entering their review cycle. DOIT bases its Maintenance and Operations program on
experiences drawn from pilot implementations conducted with selected departments over the
past three years. DOIT anticipates providing guidance to departments in extending objective
performance measures from existing project oversight processes on into the Maintenance and
Operations phase. This practice allows the State to gain more insight into improving program
performance, optimizing existing resources and business processes, and providing feedback
into the ongoing IT planning processes.
DOIT’s current IT baseline inventory forms the foundation for statewide IT Asset Management.
It also provides comprehensive baseline information in support of statewide strategic IT plan-
ning. DOIT’s Enterprise Portfolio Management System is designed to support automated and
ongoing refresh of critical Asset Management information.
Detailed Response DOIT is taking the leadership role in implementing the IT Circle of Life
within the State of California. At the core of this enterprise model core resides the Enterprise
Portfolio Management System (EPMS), which houses the State’s IT project and IT asset
information. The EPMS supports many industry best practices, including project management,
performance metrics, project tracking, cost tracking and procurement processes. The EPMS
offers major benefits to the manner in which state agencies plan, develop, monitor, implement
and maintain IT solutions. This new business model significantly improves how the State of
California manages IT investments and enhances the quality of service to its citizens.
129
DOIT is currently piloting the first major EPMS component, the IT Project Submittal and Ap-
proval Process, with ten state departments to ensure the new policies, processes, standards
and tools meet their stated objectives. State agencies will be able to register all IT projects into
a central repository and submit IT project proposals electronically to all three control agencies
(Department of Information Technology, Department of Finance and Department of General
Services) by releasing the information once the proposal is complete. The response from the
control agencies will be made available to the submitting agency online as soon as the control
agency releases that information.
As DOIT completes other components of the IT Circle of Life, more information related to IT
project proposals, project progress and asset management information will be captured and
readily available to control agencies, departments and the Legislature. Selected information
may also be made available to the public.
The use of the EPMS central repository information provides the basis to recognize and
capitalize on opportunities for enterprise solutions early in the planning process. Coordination
of similar activities between multiple agencies is an important and worthwhile endeavor, which
offers tremendous cost savings potential for the State of California.
BSA notes that the State undertakes multiple case management and licensing projects. DOIT
has been directly involved in the review and oversight of these efforts. The technology similari-
ties between these activities are severely limited by the great variation between the business
processes, external interfaces and legal requirements of each program supported. The com-
monality between case management systems, and licensing systems, is far greater between
systems supporting similar program functions in other government agencies and the private
sector than there is between state agencies. For several years DOIT’s consistent position has
been to direct agencies to seek out and obtain experience and guidance from these peers,
d
perhaps adopting those external solutions that were proven effective. This position is a depar-
ture from previous attempts to build enterprise systems to align with a standard State frame-
work, regardless of complexity and risk such efforts might entail.
DOIT, in conjunction with BSA, developed a baseline survey to collect information that per-
tained to production applications and all projects under development, including those under-
taken under departmental delegation. While the surveys were populated with production
applications from the Y2K database, departments were instructed to list all development
projects in addition to all production applications not listed on the survey.
The survey data has been loaded into an interim database, which will be used by DOIT in
reviewing the information for completeness and reasonability. DOIT will also use the data to
crosscheck development applications reported by departments with those maintained in the
project inventory database, identifying those under departmental delegation. DOIT will do a
revalidation and expand the survey.
130
DOIT currently maintains an electronic project inventory that contains all projects approved via
1o
an FSR. This inventory is continuously updated and provides the information needed for project
coordination and oversight. This inventory is used to report any project that is in trouble or
showing early warning signs while documenting a corresponding corrective action plan. DOIT
then targets those projects for higher levels of project oversight. By incorporating project
oversight into the IT Circle of Life and the associated Enterprise Portfolio Management System,
DOIT is providing continuous improvement of its project oversight capabilities.
Inventory data will be incorporated into the DOIT Enterprise Portfolio Management System
(EPMS) thereby becoming part of DOIT’s integrated corporate database. The EPMS will
support the strategies surrounding the State of California Information Technology “Circle of
Life”, which incorporates all State policies and processes impacting IT projects from concept
through implementation and on into maintenance. As a result, corresponding IT project informa-
tion will be updated as the project proceeds through each phase of the Circle. DOIT, the
departments and the Legislature will gain access to project and application information via the
EPMS, which will facilitate informed decision making as it relates to existing and new policies,
processes, procedures and tools that support the State’s IT projects.
The business value and functional need for statewide “enterprise” IT systems is more important
than the potential technical benefits. The previous administration’s enterprise workgroup
concluded that the business value of such a system to the State of California was limited, while
the cost and difficulty of such systems are high. This position has recently been reinforced
through the administration decision to abandon, at least temporarily, the multi-year effort to
procure and implement a new statewide payroll/personnel system. While DOIT remains cogni-
zant of its statutory responsibilities to identify appropriate opportunities for such systems, it
continues to consider such systems with proper regard for the State’s business needs and
priorities.
f
The previous administration’s review of IT projects had no consistent procedure for identifying
common elements across projects and only occasionally identified opportunities where depart-
ments could discuss similar projects. Those practices are not in place any more. DOIT,
through its project approval and oversight activities, has embraced opportunities to share its
knowledge of similar applications and uses of technology with department customers. Also,
through the project reporting criteria related to crosscutting statewide systems, DOIT becomes
aware of proposed development and/or purchase of systems to support enterprise activities.
As DOIT continues to reengineer its processes, the following strategies are envisioned to
assist in ensuring that coordination between DOIT and departments occur consistently and
proactively:
131
(cid:127) The Enterprise Portfolio Management “Circle of Life” program, particularly the IT Project
Submittal and Approval, Oversight/Early Warning System, PIER and Asset Management
components
(cid:127) The automated IT Project Registration System, which requires registrants to answer a set
of questions regarding program functions supported and proposed technology type, includ-
ing whether the department has reviewed similar project implementations and solutions
within other government entities
(cid:127) Enterprise software licensing to leverage economies of scale in State software purchasing.
Geographic Information Systems (GIS) represent a prime example of DOIT’s leadership and
guidance in recognizing the opportunity to capitalize on enterprise solutions. State agencies
use GIS to improve their effectiveness to plan, deliver and monitor the conditions associated
with their programs. Currently, there is no mechanism to coordinate shared information re-
sources that encourages collaboration between agencies and, ultimately, results in more
efficient and effective program delivery.
During the past year, DOIT and various state agencies partnered to develop a plan for a
Statewide Geographical Information Infrastructure. This plan involves three primary compo-
nents: a governance structure, technical system architecture, and a funding mechanism. The
purpose of the Statewide Geographic Information Infrastructure is to assemble and maintain a
statewide framework of shared geographic information that enables collaborative decision-
making and crosscutting program delivery among agencies, various levels of government, and
the public
The overall program has executive sponsorship from several agency secretaries and depart-
ments heads, including, Office of Planning & Research, Department of Information Technology,
Resources, Cal EPA, and Health & Human Services. Additionally, the working committee, the
California Mapping and Coordinating Committee (CMCC), which comprises more that 40
members from various state entities, meets regularly to implement the directions of the GIS
Executive Sponsors. The working teams have developed a business process for statewide
GIS, including initial charters for the GIS Executive Sponsors Committee, the Office of the
State’s Geographical Information Officer (GIO), the CMCC, and the proposed External State-
wide GIS Council.
The Statewide Council will include representatives from Federal, State and Local government.
This external council will serve as the primary collaborative forum to develop guiding principles
and policies that promote development, dissemination, and shared use of geographic informa-
tion in California. The external council will identify California’s geographic information needs,
priorities and standards while promoting cooperation among federal, state and local agencies
and the private sector in addressing these needs. The primary goal will be to leverage existing
and new partnerships and funding sources to accomplish the most cost-effective and efficient
means of developing and maintaining geographic information.
From an IT perspective, the GIS infrastructure is a collaboration of enterprises. Each enterprise
contributes information for the greater overall benefit of the participants. This infrastructure
provides shared information resources that encourage collaboration between agencies, result-
ing in more efficient and effective program delivery.
132
As another prime example of enterprise leadership and guidance, DOIT established the Acqui-
sition Policy and Oversight (APO) Division on July 1, 2000. The Division is committed to col-
laborative partnership with State entities, control agencies, local government entities and the
vendor community. In support of the Administration’s long-term goal to strengthen and improve
existing acquisition policies, DOIT created a Chief Information Officer (CIO) IT Acquisition
Workgroup and an Enterprise Workgroup made up of CIO’s from various departments and
local government entities. The purpose of these workgroups is to identify acquisitions that
support best value, enterprise acquisition opportunities and the enhancement of the procure-
ment process.
DOIT recently released Management Memo 01-06, Information Technology Acquisition Plan-
ning Policy. This policy requires State agencies to conduct acquisition planning and develop an
overall IT acquisition strategy to acquire IT goods and services. This policy includes the
identification of methods and approaches for conducting ongoing asset management to sustain
an IT infrastructure that supports program operations.
Leveraged agreements such as volume purchase agreement, enterprise agreements, and
master agreements represent best practices utilized to achieve saving by leveraging buying
power. In an effort to assist State entities in the management of their IT assets and to leverage
the State’s buying power, APO, through the promotion of leveraged procurements, has been
proactively supporting the development of enterprise agreements with major State suppliers
such as Computer Associates, Microsoft, IBM and Oracle.
On May 31, 2001, the first Enterprise License Agreement (ELA) was established with Oracle
Corporation. This ELA database license covers full use of the Oracle database by State
agencies to develop and deploy their applications. The agreement provides help desk services
that include distribution of software and updates, asset tracking that will facilitate better control
over the software. The agreement also provides State entities (excluding the universities)
270,000 named users, 100,000 power units, and reduced maintenance fees through Fiscal
Year 2010/2011. For a period of five years the State, City and County governments receive a
50% discount on all other Oracle products (regardless of order size).
Additionally, at the beginning of this year the State entered into a Volume Purchase Agreement
with Microsoft, which provides an initial baseline discount of fifty percent (50%) through August
1, 2001.
Currently, DOIT and the Department of General Services Procurement Division have
partnered together with State agencies to establish a Multiple Award Contract (MAC) for Geo-
graphical Information Systems (GIS) software, maintenance and other related services to be in
place by June 24, 2001. A Master Service Agreement (MSA) to provide Statewide IT Consult-
ing Services for independent oversight activities, project and quality assurance activities will be
in place by September 1, 2001.
133
The BSA asserts that DOIT does not have an established process to ensure that departments
do not independently develop statewide IT applications or duplicate other departments’ efforts.
DOIT would like to point out that the IT strategic planning processes and the project review and
approval processes inherited from the prior Administration provided neither the tools nor the
data to support implementation of enterprise initiatives. Having recognized this deficiency,
DOIT is in the process of developing its Enterprise Portfolio Management System and IT Asset
Management capabilities, which will facilitate coordination among departments while supporting
recognition and planning of enterprise initiatives.
Meanwhile, DOIT’s Project Review and Oversight (PRO) Division staff work closely with
departments to share information about other departments that are developing like systems.
f
During the Feasibility Study Report (FSR) review process, PRO staff meet on a regular basis
to discuss IT projects currently under review and share information relating to those projects.
This information is then shared with the departments that are considering similar IT projects. In
addition, the existing PRO database contains information about all FSR projects submitted for
approval. This database contains the type of technology the project proposal is addressing and
is readily accessible by all PRO and DOIT Staff.
Similarly, the Technology and Infrastructure Division offers guidance by working closely with
other departments and PRO Division staff in sharing technical standards and best practices
associated with particular technologies under consideration.
BSA Recommendation: To improve compatibility and properly guide IT development,
DOIT should expedite its efforts to implement standards by determining which stan-
dards need to be addressed first and focus their efforts accordingly. Further, DOIT
should work with departments to ensure that all necessary standards have been imple-
mented.
r
DOIT Response Summary: Done, On-going. As stated earlier, State IT Policies, Processes
and Standards comprise a major component within the IT Circle of Life. As a result, DOIT’s
process to develop, document and review State IT standards involves full participation of state
and external stakeholders. In addition, DOIT captures lessons learned via the PIER review
process to provide additional standards input. Though time-consuming, this participative
process ensures the successful adoption of full security and infrastructure standards as well as
preliminary drafts of accessibility and eGovernment applications standards. DOIT has also
adopted internal processes and standards to notify agencies when their project proposals involve
activities subject to published DOIT standards.
Detailed Response: DOIT has developed and implemented an effective process to develop,
document and review state information technology standards. This process allows full involve-
ment of state and external stakeholders. It offers the first real consensus among state
134
agencies and its suppliers regarding the value and viability of such standards in the State’s
diverse and supplier-competitive environment. DOIT acknowledges that the process it has
adopted is more time-consuming than one in which DOIT were to internally develop and publish
such standards, with or without the assistance of consultant contractors. However, the suc-
cessful implementation and statewide adoption of technical standards can be successful only if
the state is willing to invest the time and effort involved in a fully participative process.
r
In the past year, DOIT has coordinated the development and review of two full standards,
security and infrastructure, and preliminary drafts of two others, accessibility and eGovernment
applications. In addition, DOIT has published and trained state agency staff on a fully redevel-
oped set of procedures and guidelines for operational recovery planning, and is nearing
completion of policies, guidelines and procedures for software asset management. DOIT has
enabled more streamlined development of such standards in the past year by establishing a
structure of internal and external advisory committees, by adopting a full lifecycle process for
standards development, publication and maintenance, and by implementing a consistent,
documented procedure for standards review and comment. These components, which did not
exist before 1999, will enable continued, rapid progress in this critical area of DOIT leadership
and guidance for IT.
DOIT has adopted internal processes and standards to identify when agency project proposals
involve activities subject to published DOIT standards, to specifically notify the agency of the
requirement to conform to those standards, and to ensure that on-going DOIT and independent
contractor oversight activities monitor project implementation and system operation to maintain
conformance with those standards.
BSA Recommendation: To ensure that DOIT is fully employing the IT advisory councils
and receiving the benefits intended by law, DOIT should continue to meet with the
private commission and the public committee on a regular basis to guide its strategic
planning efforts, provide input on new policies and ensure that the State follows best
practices. DOIT should ensure the public committee makes all findings and recommen-
dations in writing, as required by state law. DOIT should also monitor the progress of
its CIO work groups to ensure that they reach their established goals.
DOIT Response Summary: Done, Ongoing. DOIT meets with the private commission and the
public committee on a regular basis to guide its strategic planning efforts, receive input on new
policies, and ensure that the State utilizes industry best practices and processes. All the findings
t
and recommendations from these two advisory councils are documented.
Detailed Response The private commission, known as the California Information Technology
Commission (CITC), is an elite body of experts that serve as an advisory commission on
initiatives that are planned, initiated or will be implemented. Under the previous Administration,
the CITC consisted primarily of marketing representatives. Today’s CITC is comprised of thirty-
five industry technology leaders, including Chief Information Officers and Chief Technology
135
Officers, carefully selected from a cross-section of public, private, academic, non-profit and
other organizational structures that provide advice and best practice information to assist the
State in responding proactively to IT issues and trends. The CITC advises DOIT on key
policies impacting the State’s IT direction and provides insight to strategic technologies that are
proven to solve complex business problems. Commission meetings are public and designed to
solicit input from the public. Agendas and meeting notices outlining the business of the Com-
mission are posted on the DOIT’s web page ten days prior to each meeting.
The following represent quotes from CITC members citing DOIT’s important contributions to
technology leadership within state government:
“DOIT is vital to keeping the state up to date on info tech issues and will undoubtedly continue
to provide quality guidance it is known for.” – Apple Computer
“Continuing its current course, DOIT is in a unique position to make a lasting contribution
toward the challenges that the State and the people of California face as the State ventures
further into the era of eGovernment transformation.” – IBM
“DOIT provides needed leadership and oversight and ensures that IT investments are managed
properly, including enterprise initiatives such as eGovernment implementation, Geographic
Information Systems (GIS), and other major enterprise-wide initiatives.” – Compaq
“Its coordination and review of projects saves state revenue by spotting inefficiencies and
recommending remedies to them. It also enhances the state’s productive engagement with the
Information Technology industry by setting benchmarks and standards to which we can aspire.”
– Unisys
“As a member of the California Information Technology Commission, HP has appreciated the
opportunity to see first-hand the potential that DOIT has to provide leadership and vision for
many of the technology challenges facing California in the near future.” – Hewlett Packard
“The department plays a critical role as a central planning and oversight agency for the state’s
information technology programs.” – Microsoft
“Under the current leadership demonstrated by the DOIT, California is on the threshold of
establishing public sector IT standards which have been proven by leading commercial industry
stakeholders in California’s Information Technology marketplace. This California based market-
place leads the world in IT practices and has come of age. Under the DOIT leadership, these
practices and standards are finally making their way into public sector IT policy.” – CTA
“Pacific Bell supports the leadership of the Department in exercising oversight of state agen-
cies’ information technology projects. Centralized strategy planning and policy processes on
a statewide basis will bring cost savings that benefit all Californians.” – Pacific Bell
136
“Since the beginning of the Davis Administration, Cisco Systems has worked with DOIT on
initiatives from Y2K compliance to the Project Registration System. DOIT has shown leader-
ship in improving the State’s ability to apply, manage and implement information technology.” –
Cisco Systems
“The DOIT’s development of acquisition policies, standards, and adherence to industry best
practices has had a significant impact on improving the efficiency and effectiveness of critical
IT project teams.” – Logicon
DOIT established the public committee, referred to as the Enterprise Coordination Council
(ECC) and formerly known as CIO Advisory Council, to foster collaboration across the State
and to provide technical advice and strategic direction to ensure all agencies share a single IT
vision. DOIT meets with the ECC regularly to guide its strategic planning efforts, receive input
on new policies, and ensure that the State follows IT best practices. The current council is
comprised of CIO’s that chair the thirteen discrete DOIT-sponsored CIO Advisory workgroups
and the Agency Information Officers (AIO’s) representing Business, Transportation and Hous-
ing Agency, State and Consumer Services Agency, Health and Human Services Agency,
Resources Agency, Environmental Protection Agency and DOIT.
The CIO Advisory Workgroups focus on Recruitment and Retention, Training, FSR
Reengineering, IT Acquisition and Security, to name some of the thirteen DOIT-sponsored
workgroups. All of the CIO Advisory Workgroups are key to DOIT’s mission and objectives,
with CIO’s and senior IT staff representing in excess of fifty departments serving on the vari-
ous workgroups. Each workgroup has an average of fifteen members with some much larger,
such as the FSR Reengineering, which has more than eighty members representing over forty
departments. Members representing the departments of Finance, General Services, Correc-
tions, Motor Vehicles, Employment Development, Social Services, Health Services, State
Personnel Board, Health and Human Services Data Center, Teale Data Center, Governor’s
Office of Planning and Research, and the Governor’s Office for Innovation in Government
participate, to name only some that serve on the various CIO Advisory Workgroups.
t
ECC meeting agendas and notes are maintained. All proposed policies are submitted to the
council for their review and comments. DOIT executives and senior managers are members of
the CIO Advisory Workgroups to ensure that continuity of the Workgroups’ efforts are focused
on agency and statewide strategic goals. New CIO Advisory Workgroups are established as
key statewide challenges or new initiatives arise.
Since their initial meetings, the CITC and ECC have reviewed proposed policies that include
the California Software Management Policy, IT Management Policy and Feasibility Study Report
(FSR) Reengineering effort. This review included the metrics to support the FSR reengineering
effort. The council also evaluated the Enterprise Portfolio Management System (EPMS), which
supports the State’s IT “Circle of Life”. The advisory council has provided input to the collective
efforts underway regarding Statewide IT Recruitment and Retention, including the IT Classifi-
cations minimum qualifications and alternative approaches that may be incorporated to
137
recruit and retain IT Staff. More specifically, DOIT’s Recruitment and Retention Unit along with
the CIO Advisory Workgroup has taken the lead of the State’s effort to revise the minimum
qualifications for 30 of the State’s 34 primary IT classifications. The Recruitment and Retention
Unit recently coordinated participation in a Technology job fair resulting in resumes from over
350 qualified individuals interested in State IT careers. Prior to revising the minimum qualifica-
tions, less than ten per cent of these individuals would have been eligible for State technology
jobs. A subsequent recruitment activity resulted in over 100 recent college graduates submit-
ting resumes and expressing interest in State IT careers. Again, the revised qualifications
acknowledge all of an individuals related work experience, providing much broader career
options for all, especially the college graduates.
BSA Recommendation: To ensure that it completes initiatives, DOIT should establish
timelines and goals for meeting future initiatives. If DOIT does not believe it can com-
plete initiatives within established guidelines, it should communicate its priorities and
resource requirements to the Legislature. In addition, it should notify the Legislature
when changes in the State’s IT environment prompt adjustments to these priorities or
resource requirements.
DOIT Response Summary: Done, Ongoing. DOIT, with support from legislative staff, has
developed a realistic timeline for policy development and publication. DOIT will report its
progress to the appropriate legislative staff to meet those commitments and will promptly notify
the Legislature if DOIT needs to readjust priorities or resource requirements due to changing
circumstances. DOIT has also offered to meet with the Legislative Analyst Office and legisla-
tive staff, as needed, to keep them engaged.
Detailed Response: DOIT and legislative staff met and agreed to a prioritized and realistic
plan for DOIT policy publication. During the 2001/02 Budget process, DOIT worked directly
with representatives of the Legislature, including staff for the budget subcommittees and the
Legislative Analyst Office, to identify and prioritize DOIT policy and standards development
efforts. These working sessions resulted in an agreed upon schedule to develop and formally
publish policy based upon mutual agreement of priorities and the availability of DOIT and
external resources to perform those efforts. DOIT will continue to engage the appropriate
legislative staff to providing the respective progress in meeting these commitments. Further-
more, DOIT will promptly inform the Legislature if it has a need to readjust priorities due to
unforeseen circumstances, such as changes in the State’s IT environment or higher than
anticipated impact from HIPAA.
BSA Recommendation: To organize and focus its efforts, DOIT should adopt an internal
strategic plan to identify key responsibilities and establish priorities. This plan should
clearly describe how the organization would address its many responsibilities, particu-
larly those that we observed it has not sufficiently accomplished. Further, it should
build on past efforts to the extent possible rather than reinventing processes and prac-
tices when planning its future activities.
138
y
DOIT Response Summary: Done, Updates Ongoing. DOIT has always operated from an
internal strategic plan. However, as of January 2001 DOIT began drafting a new internal Strate-
gic Business Plan, establishing priorities and key responsibilities to “operationalize” DOIT’s IT
Circle of Life and supporting Enterprise Portfolio Management System. This plan offers a com-
prehensive approach to organizing and addressing DOIT’s multi-faceted responsibilities as well
as prioritizing its efforts and establishing measurable objectives. However, rather than building
on fragmented and archaic processes and practices of the prior Administration, DOIT’s current
reengineering efforts undertake a more comprehensive and consistent approach on enterprise
crosscutting issues that span the entire technology lifecycle.
Detailed Response: As of January 2001, DOIT began drafting a revision to its internal Strate-
gic Business Plan to reflect organizational objectives beyond Y2K. This plan publishes time
frames for issuing standards and policies, documents communication strategies through
DOIT’s on-going advisory councils, and defines the strategic framework DOIT will use to
coordinate the State’s IT activities. It also establishes and prioritizes measurable objectives to
maximize DOIT’s value to the State IT governance structure while ensuring consistent perfor-
mance. In doing so, DOIT defines a baseline against which it can ensure it has the resources
necessary to achieve those objectives.
Leveraging successful methodologies from the private sector, including the Project Manage-
ment Institute’s (PMI) Project Management Body of Knowledge relating to best practices in the
IT industry, DOIT is working to redefine itself, its operating model and vision. Central to this
approach is the framework in which all of DOIT’s specific tactical and strategic objectives will
be realized, the IT Circle of Life. This innovative operating model enables the State to imple-
ment an enterprise-wide Asset Management strategy via the Enterprise Portfolio Management
System (EPMS). The EPMS enables the State to make technically sound and financially viable
investments in IT for the optimum benefit of state government and the state’s citizens. DOIT’s
Strategic Business Plan addresses to “operationalizing” the State’s Information Technology
Circle of Life and supporting EPMS by defining a comprehensive set of organizational strategic
initiatives extending through Fiscal Year 2004/2005.
DOIT recognizes that recent key management turnover has had a significant impact and
caused critical institutional program knowledge loss and the disruption to internal planning
efforts. As a result, DOIT has intensified its efforts to support Legislative action that eliminates
the existing 2002 sunset date. Confronting the uncertainty that such a sunset date brings is not
only deleterious to staff morale, but creates an undue challenge for DOIT’s internal strategic
planning efforts.
3
DOIT disagrees that it has not taken sufficient advantage of the processes and priorities
established by prior management. Severe resource limitations forced the previous Administra-
tion to focus on exceptions and high-visibility projects; hence, policies and practices during that
139
time reflect a fragmented approach to technology leadership, guidance and oversight. While
reengineering statewide policies and procedures, DOIT has considered those policies and
practices employed. However, DOIT is currently better staffed and therefore able to undertake
a more comprehensive and consistent approach to enterprise crosscutting issues that span
the entire technology lifecycle.
DOIT has engaged a top management consulting firm to evaluate its capability to perform the
program areas (e.g., strategic planning) and to develop recommendations that improve DOIT’s
efficiency and effectiveness. This company will review DOIT’s existing goals and objectives,
and evaluate how well its policies and procedures, organizational structure, and staffing levels
enable it to achieve these goals. This firm will also develop recommendations on automated
tools that may assist DOIT in this process, as well as develop education and training programs
for DOIT and state agency staff.
140
COMMENTS
California State Auditor’s Comments on
the Response From the Department of
Information Technology
T
o provide clarity and perspective, we are commenting on
the Department of Information Technology’s (DOIT)
response to our audit report. The numbers correspond with
the numbers we have placed in DOIT’s response.
1
Throughout its response, DOIT indicates that it is addressing our
recommendations through its new enterprise portfolio manage-
ment program. However, it is important to recognize that this
program is in its infancy. DOIT at times discusses elements of the
program as though they were in place, but as we note in several
places of our report, DOIT has only just begun to initiate its
reengineered processes. While DOIT recently began piloting
certain processes, such as the approval of feasibility study reports,
it plans to implement elements of its reengineered processes over
the next several years. Therefore, we are unable at this time to
assess the value that its efforts will add to the oversight of the
State’s information technology (IT) development.
2
Although DOIT believes our recommendations are of limited
value, it also states that our recommendations are consistent
with the new enterprise direction it is taking and reports progress
on each of the recommendations. Additionally, it is clear from
our discussions with DOIT that it is using the term “artifacts” to
describe documents or other pieces of evidence that we had
requested to support its actions related to past, current, and
planned activities. Generally accepted government auditing
standards require auditors to obtain sufficient, competent, and
relevant evidence to afford a reasonable basis for findings and
conclusions. Because DOIT often lacked documents or evidence
to demonstrate or support its actions, it is not surprising that
DOIT criticizes our focus on what it terms “artifacts.”
141
3
DOIT is mischaracterizing our recommendation. Our point is that
DOIT should not reinvent past processes and procedures that had
merit. We recognize that many improvements are needed to
DOIT’s operations; however, to discount all past efforts as flawed is
both wasteful and shortsighted. Additionally, we are troubled that
throughout DOIT’s response, it blames the processes of the
previous administration for problems we cite in our report. The
current state chief information officer (state CIO) was ap-
pointed in February 1999. Yet each of the weaknesses we noted
were the result of processes used since then. Further, DOIT has
only begun to initiate changes to its processes.
4
DOIT’s comments about the focus of our audit are misleading.
Chapter 2 specifically addresses the audit objective of how well
departments are managing the development of their IT projects.
We informed DOIT management that Chapter 2 would address
our findings and recommendations related to other departments
that we reviewed, but that we could only share with DOIT what
we reported related to its operations. Moreover, as discussed on
page 11 of our report, many of the specific areas the Joint
Legislative Audit Committee asked us to review were under the
direct responsibility of DOIT. The extent to which we have
findings and recommendations related to DOIT is indicative of
the extent that it has weaknesses in its operations.
5
DOIT dismisses our audit as a “typical compliance audit,” yet the
areas we reviewed, and for which we found DOIT’s performance
lacking, are responsibilities that are critical to its mission in
providing leadership over the State’s IT efforts and not merely
compliance issues. For example, as we discuss on page 16 and
page 18 of our report, DOIT has not provided a current statewide
IT plan that would act as a guide for the State’s IT efforts nor has
it sufficiently reviewed the strategic plans for departments’ IT
efforts. Further, DOIT indicates throughout its response that it is
addressing our recommendations through its new enterprise
portfolio management program. However, DOIT has only
recently begun a pilot of some elements of the program and has
not even begun to reengineer other elements of the program.
Thus, an audit cannot assess the effectiveness or outcomes of
what DOIT holds out to be its major accomplishments until
such accomplishments are achieved.
142
6
DOIT’s conclusion that there have been no failed major projects
among those that were approved or sponsored by the current
state CIO seems premature. As noted previously, the current state
CIO was appointed in February 1999. It is unlikely that many
major projects have been approved, funded, started, and com-
pleted since then. Further, it appears that DOIT has a very narrow
view of whether a project is successful. A broader view focuses on
whether completed projects achieve the original intended ben-
efits and reasonably meet the original cost and schedule targets.
Because DOIT has not ensured that departments complete
postimplementation evaluation reports to assess the benefits and
costs of completed systems, it has little basis for commenting on
the extent to which projects have been successful under the
administration of the current state CIO.
7
DOIT is wrong. The audit analysis did not state that we would
evaluate the sufficiency of resources allocated by the prior
administration. Rather, the audit analysis states that we would
evaluate the sufficiency of DOIT’s resources to fulfill its statutory
responsibilities. Moreover, focusing on the sufficiency of
DOIT’s current resources is appropriate because doing so would
determine whether a recommendation for change is warranted. In
accomplishing this objective, we obtained DOIT’s Capability
Assessment Report that it submitted to the Legislature in
March 2001. DOIT prepared this report in response to the
Legislature’s requirement that it provide an independent assessment
of the activities and resources needed by DOIT to successfully
manage IT projects. In this report, both DOIT and a consultant it
hired concluded that DOIT’s authorized staffing of 80 positions
for fiscal year 2000-01 was sufficient to perform its statutory
responsibilities. We discuss this conclusion as well as some
history on DOIT’s staffing on page 7 of our report.
8
DOIT indicates its sunset date is a primary cause of staff turnover.
However, it appears as though other factors play a role. On page
65 of our report, we discuss turnover in key management posi-
tions stating that, since July 2000, 8 of DOIT’s 11 key managers
have left. Individuals in these positions serve at the will of the
state CIO and, therefore, are subject to removal at any time.
Further, many of those individuals have accepted positions with
similar employment conditions at other state departments. Thus
we question whether the 2002 sunset date is the primary cause of
high turnover.
143
9
DOIT has not accurately depicted one of our comments regarding
the year 2000 effort. As discussed on page 64, we acknowledged
that the governor told DOIT that the year 2000 effort was its top
priority. However, the governor’s executive orders did not relieve
DOIT of its responsibility to oversee departments’ IT efforts.
Therefore, as we stated on page 64, faced with insufficient re-
sources to focus on the year 2000 effort and still adequately
cover its other responsibilities, DOIT should have requested
additional staff for its other responsibilities. Further, while many
departments’ projects were deferred because of the year 2000
effort, it was still important for DOIT to meet its responsibilities
for those that were not deferred, particularly projects that were
large and considered high-risk.
0
DOIT is misleading when it indicates that we concluded “that a
great deal of important work remains to reconstruct previous
administration’s flawed IT management infrastructure.” Any
conclusion regarding the extent to which the previous
administration’s infrastructure was flawed is solely that of the
current administration of DOIT.
q
DOIT appears to be trying to deflect the leadership problems we
observed by blaming its problems on the State’s IT governance
structure. However, this governance structure is one that any
control agency within a decentralized government must operate
within, and those that are effective demonstrate strong
leadership. During our audit, we asked DOIT if it had sufficient
authority to effectively oversee and guide the State’s IT efforts
and if there were any barriers to exercising its authority. In a
written response dated October 5, 2000, DOIT stated that it
believed it had sufficient and appropriate authority to discharge
its responsibilities. Additionally, it stated that it “does not believe
that statutory changes are necessary to assist it in discharging its
statutory responsibilities to oversee and guide state IT.” Further,
DOIT also stated that the most severe barrier to DOIT
implementing its full statutory authority is the continued
existence of its sunset provision and did not mention any other
barriers. Thus if DOIT considered that changes in the governance
structure or the removal of barriers were needed for it to properly
carry out its responsibilities, DOIT should have recommended the
changes it believed were necessary. By asserting that governance
is the problem, DOIT appears to be redirecting the responsibility
for its problems to the environment in which it operates within.
Our audit confirms that DOIT needs to improve its leadership as
indicated throughout our report.
144
w
DOIT’s statements about our sample on pages 101 and 123 are
misleading. We focused our review on projects approved during
fiscal year 1999-2000 because this was the most recent period in
which projects had completed the approval process and were
funded for development. Further, we attempted to obtain the
number of projects approved by DOIT during this period from its
records, but found that DOIT was not adequately keeping track
of such information. The Department of Finance’s records
indicate it received 124 feasibility study reports for proposed
projects during fiscal year 1999-2000—substantially less than the
300 projects that DOIT states. Of these 124 feasibility study reports,
64 were approved, and the remainder were disapproved,
withdrawn, duplicates, or returned to the department. Because
our sample of 10 projects was about 15 percent of the projects
approved during that fiscal year, our sample provides a reasonable
basis to evaluate DOIT’s approval process. Moreover, we believe
that a sample of 10 projects was appropriate because the results
were consistent. DOIT could not provide sufficient evidence that
it thoroughly analyzed any of the projects we reviewed.
e
DOIT is misleading when it states that it is able to review all
postimplementation evaluation reports submitted by departments.
As we discuss on page 30 of our report, DOIT states that it re-
cently began to review a few evaluation reports. When we asked
DOIT for evidence of its reviews in May 2001, DOIT provided us
information that showed it had only recently reviewed 3 evaluation
reports. Further, as discussed later in its response, on page 128,
DOIT indicates that it had reviewed all 87 reports that it
received from departments since 1996. However, DOIT was
unable to provide us any evidence that it had actually reviewed
these 87 reports.
r
Contrary to what it indicates, DOIT is not “done” with implement-
ing any portion of our recommendation on standards. As we
described in Table 2 on page 59 of our report, four of five key
standards we identified are still in draft form, and the process to
develop the remaining standard has not started yet. Additionally,
DOIT still plans to develop other standards in the future
including those for asset management and e-mail. Finally, as
we recommended in the report, we believe DOIT should work
with departments to ensure that all necessary standards have
been implemented.
145
t
Contrary to its assertion, DOIT was unable to provide us any
written findings and recommendations generated by the CIO
Advisory Council (which DOIT now calls the Enterprise Coordina-
tion Council), as we discussed on page 61 of our report. DOIT’s
failure to maintain this information, as required by state law,
restricts the ability of interested parties, including members of the
public and the Legislature, to review the advice this council
provides DOIT.
y
Although DOIT claims it has always operated under an internal
strategic plan and began revising it in January 2001, DOIT was
unable to provide us more than a high-level operating plan for
July 2000 through March 2001. As discussed on page 64 of our
report, this plan is a list of numerous activities that did not
differentiate between activities that must be completed and
those that were less critical. Additionally, the list lacked measures
for DOIT to determine if its efforts are effective. Further, it is
doubtful DOIT had an internal strategic plan, because it told us
at our exit conference that it did not provide a plan to the con-
sultant hired in October 2000 to analyze its internal operations.
In fact, the consultant’s report in January 2001 recommended
that DOIT “rigorously prioritize its efforts.”
u
DOIT overstates the extent to which it has taken an active
leadership role in various efforts, including promoting architectural
consistency. It has not formally issued technical standards that
would promote this consistency. Additionally, DOIT has not
fulfilled other leadership responsibilities such as ensuring it has
up-to-date policies to guide departments’ efforts.
i
DOIT has not presented the whole story from Governing
Magazine’s 2001 report that discusses California’s IT activities.
DOIT omitted the report’s key criticism of the State’s IT
efforts—“Inefficiencies today occur primarily because of a lack of
comprehensive data format and content standards.” This criticism
of the lack of data standards, as we discuss on page 59 of our
report, addresses an area of responsibility where state law has
clearly given DOIT the leadership role. Additionally, it appears as
though the authors of this report were not always provided
accurate information. The report credits California as having
postimplementation audits to make sure that projects deliver
their promised reports. Yet, we found, as discussed on page 30 of
our report, that DOIT has not ensured that departments submit
postimplementation evaluation reports and that it has only
recently begun to review a few of them.
146
o
DOIT states that it has established a statewide inventory
containing IT project and infrastructure information across all
state agencies. However, as we discuss on page 57 of our report,
the departments’ information that is the basis for the inventory
contain many problems and inconsistencies. As a result, DOIT
needs to expend considerable effort to obtain consistent and
accurate project information. As we discuss on page 58 of our
report, it is unclear at this time when DOIT will have a complete,
accurate, and up-to-date inventory available for departments to
coordinate their efforts and for the Legislature and control agencies,
including DOIT, to improve their oversight.
p
DOIT’s comments about the reviews of departments’ IT plans are
misleading because it indicates that the insufficient reviews were a
practice of the prior administration, thus implying that DOIT has
been reviewing these plans since the current state CIO was
appointed in February 1999. However, as discussed on page 18 of
our report, DOIT indicated that reviewing these plans in the past
did not merit assignment of its resources because of higher priori-
ties, including the year 2000 effort, and thus these reviews occurred
only sporadically. DOIT also stated that it began reviewing depart-
ments’ IT plans on a case-by-case basis in May 2001—as of that
time, it had completed a draft review of one department IT plan—
and it plans to redefine this process sometime in early 2002.
a
The activities that DOIT asserts provide evidence of its “completed
analysis” were the same ones that we reviewed and found to be
insufficient. Specifically, as noted on page 22 of our report, for
5 of the 10 projects we reviewed, we found no evidence
documenting DOIT’s analysis—checklists, project summaries, or
other documents, such as DOIT’s questions to departments. For the
remaining 5 projects, the evidence of DOIT analysis was
insufficient to demonstrate why DOIT approved the projects.
s
DOIT’s statement that its current review process ensures that
each risk assessment responds to all questions in accordance with
the type of project being proposed is misleading. As we discuss
on page 24 of our report, DOIT does not require departments to
answer the same questions when submitting their risk assess-
ments. Some departments are asked to respond to as few as 5
questions while others must respond to as many as 38. We found
no indication that the variance in questions asked was caused
by the type of project. Additionally, DOIT’s current review
process allows departments to perform risk assessments late in
the approval process for those projects using the alternative
procurement process.
147
d
We recognize that the same systems may not be appropriate at
each department, but departments can benefit by sharing their
knowledge and experiences with technology, development
approaches, and vendors on projects in similar business areas.
Further, rather than directing departments to seek out others,
which DOIT indicates is its current approach, we believe it is part
of DOIT’s leadership role to facilitate this sharing.
f
DOIT is mischaracterizing its current coordination activities.
DOIT states that it was the previous administration’s review of IT
projects that had no consistent procedure for identifying
common elements across projects. DOIT claims that these
practices are not in place anymore and that DOIT, through its
project approval and oversight activities, embraces opportunities
for coordination. Later in its response, on page 134, DOIT
contends that its staff work closely with departments to share
information about other departments that are developing like
systems. However, as noted on page 54 of our report, DOIT’s
current activities lack a mechanism that would consistently
identify similarities among IT projects. Such a mechanism could
foster coordination beyond analysts’ ability to recognize
similarities among projects. Our report also acknowledges that
DOIT plans to improve its ability to identify projects with similar
characteristics by creating a new database that will capture
information from more than 200 questions that it will ask
departments about their projects. However, DOIT has not yet
implemented this process.
148
Agency’s comments provided as text only.
Business, Transportation and Housing Agency
980 9th Street, Suite 2450
Sacramento, California 95814-2719
June 13, 2001
Elaine M. Howle
State Auditor
Bureau of State Audits
555 Capitol Mall
Sacramento, CA 95814
Dear Ms. Howle:
Attached is the Department of Transportation's (Caltrans) response to your June 7, 2001,
draft audit report dealing with the State's management of information technology (IT). As
its response indicates, Caltrans concurs with the report's findings and recommendations
related to its Advanced Toll Collection and Accounting System (ATCAS) project. The
Business, Transportation and Housing Agency (Agency) also concurs with the report's
findings related to Caltrans' project management, and is pleased to note that the BSA
acknowledged external circumstances that also adversely affected the ATCAS project.
Additionally, the Agency concurs with the report's recommendations, and supports
Caltrans' plan for corrective action.
We are thankful for your review, and for the opportunity to respond to the draft report. The
BSA recommendations will be very helpful in improving the management of current and
future IT projects. If you need additional information, please do not hesitate to contact me,
or Michael Tritz, Chief of the Agency's Office of Internal Audits, at (916) 324-7517.
Sincerely,
(Signed by: Al Lee for)
MARIA CONTRERAS-SWEET
Secretary
Attachment
149
Department of Transportation
Office of the Director
1120 N Street, MS 49
Sacramento, CA 95814
June 12, 2001
MARIA CONTRERAS-SWEET, Secretary
Business, Transportation and Housing Agency
980 - 9th Street, Suite 2450
Sacramento, CA 95814
Dear Secretary Contreras-Sweet:
I am pleased to provide our response to the Bureau of State Audits' (BSA) draft audit report
dealing with the State's management of information technology (IT). The Joint Legislative Audit
Committee requested the audit, which covered a complex IT project at each of four State agen-
cies.
The primary finding related to the California Department of Transportation's (Department) man-
agement of the Advanced Toll Collection and Accounting System (ATCAS) is that the Department
did not effectively manage the ATCAS project in accordance with the 1998 Legislative Analyst's
Office's "Best Practices" and State requirements for IT projects. Notwithstanding the fact that the
ATCAS project was initiated in 1993, the Department concurs with the issues and recommenda-
tions noted in the report. Following is each BSA recommendation, followed by a discussion of our
corrective efforts.
Recommendations
The BSA recommended that the Department take the following actions to improve the
Department's IT project management practices (BSA recommendations are in bold):
Develop a problem statement for each IT project that adequately describes the problem
the project is intended to solve with quantifiable goals, and a supportable business case
for each project that justifies its funding.
The Department concurs with this recommendation and recognizes that as a result of decentral-
ized IT project initiation and the lack of IT policy direction, projects in the past did not have a fully
150
MARIA CONTRERAS-SWEET
June 12, 2001
Page 2
documented business case. The Department is currently establishing the Program and Project
Management Division (PPMD). The Project Initiation and Reporting Office, within the PPMD, will
be responsible for enterprise project initiation.
All project Feasibility Study Reports statewide will be reviewed for compliance with State and
departmental IT policy, and will ensure that the project proposal fully documents the business
case. The PPMD is targeted to become operational in July 2001.
Develop an effective project management plan before beginning to develop each project
so it can monitor the progress of the project.
The Department concurs with this recommendation. As a result of similar findings from other
external and internal audits, the Department will perform the following:
(cid:127) Expand on internal IT policies and procedures.
(cid:127) Fine tune and deploy the Department's IT Project Management Methodology (PMM) for
enterprise use, by October 1, 2001.
(cid:127) Deploy a development tool set that will directly support the enterprise PMM and will enable
repeatable processes for project delivery and the project manager's ability to estimate project
schedules and cost.
(cid:127) Provide a training program on the PMM starting June 11, 2001. Three levels of training are
planned: 1) executive level staff, 2) project managers, and 3) project development staff.
(cid:127) Provide project management training during the first quarter of FY 2001/2002. This training
will be Project Management Book of Knowledge (PMBOK)-based and will provide the educa-
tional background necessary to pursue project management certification.
Allow vendors to propose solutions and the technical specifications for its large and
complex IT projects.
The Department concurs with this recommendation. The Department intends to allow vendors to
propose solutions and the technical specifications for its large and complex IT projects procured
both in conformance with the traditional Request for Proposal process and the Alternative Pro-
curement methodology initiated following Management Memo 98-12, issued on June 24, 1998.
The first project implemented under the Alternative Procurement process was the Transportation
Operations and Project Support System (TOPSS). Subsequently, the Department has worked
with the Department of Information Technology (DOIT) and the Department of Finance's Technol-
ogy Investment Review Unit (TIRU) in further refining the use of what has evolved into the
151
MARIA CONTRERAS-SWEET
June 12, 2001
Page 3
Alternative Procurement Business Justification (APBJ) process. As both procurement processes
have evolved, the Department has recognized the need to provide the vendors with the depart-
mental standards for the IT architecture and with a business case for the project, in the beginning
of the process, to allow vendors to propose solutions and technical specifications.
Ensure that testing is completed at appropriate phases to identify and resolve problems
before moving ahead.
The Department concurs with this recommendation. The Department anticipates the training and
deployment of the PMM will help ensure that the appropriate testing will take place on IT projects.
The Department's IT division is planning to develop Quality Assurance and IT Architecture units.
These units will provide operational support for the PMM. The Department believes it can ensure
that the various phases of an IT project are validated through the full project lifecycle by utilizing
the Independent Validation and Verification (IV&V) processes, the oversight of the Risk Manage-
ment Office, and the Quality Assurance and IT Architecture units.
Ensure that it uses sound management practices during the development of each project,
such as assigning qualified individuals with appropriate experience and training to
manage the project, documenting key discussions and decisions, and monitoring
progress through periodic reports.
The Department concurs with this recommendation. The Department is creating the PPMD to
ensure better management and consistencies in IT project development, enterprise-wide. The
PPMD is targeted to be operational in July 2001. The Department will provide IT outreach and
educational programs to further promote the staff's awareness of the IT policy and project
definition. As part of the educational programs, project managers will receive training regarding
IT project documentation, monitoring and reporting requirements. The PPMD will support the
following activities from both a policy and operational perspective:
(cid:127) IT strategic planning and performance measures.
(cid:127) IT project initiation and reporting.
(cid:127) IT IV&V and risk management.
(cid:127) IT acquisitions of goods and services.
(cid:127) Business process re-engineering and data administration.
152
MARIA CONTRERAS-SWEET
June 12, 2001
Page 4
The creation of the PPMD, and the deployment and training for the PMM will be major steps
toward the improvement of the Department's IT practices.
Use independent verification and validation consultants on complex IT projects.
The Department concurs with this recommendation. Management Memo 00-11, Information
Technology Oversight Policy, was issued on November 3, 2000. This policy establishes a frame-
work for effective oversight of State IT activities. The Department understands the need for IV&V
to provide an independent reporting entity to the DOIT. The Department is utilizing or is planning
to utilize project oversight and/or IV&V contractors on the following projects:
(cid:127) ATCAS
(cid:127) PRSM
(cid:127) Transportation Permits
(cid:127) TOPSS
(cid:127) Integrated Maintenance Management System (IMMS)
The Department will continue to utilize IV&V contractors for specific IT projects as appropriate.
As previously stated, one of the functions of the PPMD is to promote, monitor and assist project
managers with the engagement of IV&V contractors for their projects.
If we can provide further information, or if you have any questions, please contact Gerald Long,
External Audit Coordinator, at (916) 322-7122.
Sincerely,
(Signed by: Tony V. Harris for)
JEFF MORALES
Director
153
Blank page inserted for reproduction purposes only.
154
Agency’s comments provided as text only.
Health and Human Services Agency
1600 9th Street, Room 460
Sacramento, CA 95814
June 13, 2001
Ms. Elaine M. Howle
State Auditor
Bureau of State Audits
555 Capitol Mall, Suite 300
Sacramento, CA 95814
Dear Ms. Howle:
Thank you for forwarding for my review and comment a draft copy of the Bureau of State Audits'
report as it relates to one of the Department of Health Services' (DHS) and one of the Employ-
ment Development Department's (EDD) information technology projects. I am forwarding to you
both DHS' and EDD's responses to the review findings and recommendations.
I understand that DHS and EDD have begun taking steps to address the issues raised in the
Bureau's report.
Thank you once again for sharing the draft copy of your findings and recommendations. If you
require further information concerning DHS' or EDD's information technology projects, please do
not hesitate to contact me directly. You may also contact Diana M. Bontá, the Director of the
Department of Health Services, at (916) 657-1425 and Michael Bernick, the Director of the
Employment Development Department at (916) 654-8210 to assist you.
Sincerely,
(Signed by: Grantland Johnson)
GRANTLAND JOHNSON
Secretary
Enclosure
155
Department of Health Services
714/744 P Street
Sacramento, CA 95814
Ms. Elaine M. Howle
State Auditor
Bureau of State Audits
555 Capitol Mall, Suite 300
Sacramento, CA 95814
Dear Ms. Howle:
Thank you for the opportunity to comment on the draft of the Department of Health Services'
(Department) portion of your recent audit dealing with the Children's Medical Services Network
Enhancement 47 (CMS Net E47) project and the State's management of information technology.
The Department recognizes the importance of using sound management practices for its infor-
mation technology (IT) projects and ensuring that its projects are completed on time and within
budget. The Department agrees with the Auditor's Best Practices recommendations, and will
continue taking action to implement them as available resources permit, both for the duration of
the CMS Net E47 project, as well as for future IT projects the Department undertakes.
The Department is committed to the establishment of a centralized Project Management Office
(PMO) in the Information Technology Services Division (ITSD) to enhance the effectiveness and
success of the Department's IT projects. In addition to providing ongoing project management
direction and oversight to Department initiatives, the PMO will help ensure implementation of the
Best Practices as detailed in the Auditor's recommendations.
A more detailed overview of the Department's activities and plans to implement the recommen-
dations, as well as our comments on specific audit findings, is provided in the enclosed "Com-
ments on Draft Audit Report from Bureau of State Audits".
If you have additional questions or concerns, please feel free to contact Mr. Rick Vagg, Acting
Deputy Director, Information Technology and Services Division (ITSD), at
(916) 657-1255. Again, thank you for the opportunity to comment.
Sincerely,
(Signed by: David Souleles for)
Diana M. Bontá, R.N., Dr.P.H.
Director
Enclosure
156
COMMENTS ON DRAFT AUDIT REPORT
FROM BUREAU OF STATE AUDITS
Response to BSA Recommendations
The Bureau of State Audits recommends that the Department should take the following actions to
improve the management of information technology (IT) projects:
(cid:127) Select vendors that propose the best solutions at the best value.
The Department agrees with this recommendation. In order to ensure that future procure-
ments by the Department follow the State's best practices for selecting vendors and best
solutions, the Department is establishing a centralized project management office in the
Information Technology Services Division to oversee Department initiatives.
For the CMS Net enhancement, the Department will procure a new developer for the remain-
ing components of the project through an alternative competitive procurement process that
follows best practice guidelines.
All the development contracts for the CMS Net enhancement project noted by the auditors
have ended and the contractors have completed the scheduled work.
(cid:127) Structure contracts with vendors to protect the interests of the State, including provi-
sions to pay vendors only after deliverables have been tested and accepted.
The Department agrees with this recommendation and will strengthen future contracts for IT
development projects to incorporate best practices, including selecting the vendor based on
best value; ensuring that the contract is deliverables-based; providing contract language to
protect itself if the vendor does not complete its work on schedule; and retaining a portion of
payments to the vendor until work is performed satisfactorily. The Department's new project
management office will provide direction and oversight in contract management, procure-
ment, and best practices to support Departmental IT projects.
(cid:127) Use sound project management practices during the design, development, and imple-
mentation phases of projects and specifically ensure that it assigns project managers
with appropriate training and authority.
157
The Department agrees with this recommendation. The new project management office is
proposed to be headed by a project management officer established at the Career Executive
Assignment II level. A temporary project management officer has been appointed through an
interim redirection. Project management positions will be requested at the Data Processing
Manager III and IV levels, depending on the complexity and requirements of the project. In
filling the positions, the Department will seek experienced project managers who have or are
in the process of obtaining Institute of Electrical & Electronic Engineers (IEEE) and/or Project
Management Body of Knowledge (PMBOK) certification.
The Department has been using recognized industry best practices for project management
on the CMS Net enhancement project, beginning in November 1998 with the recommenda-
tions made by the Independent Verification and Validation (IV&V) contractor. Examples of
sound project management practices adopted by the CMS Net enhancement project include
development of procedures to manage and control changes; development of smaller projects
with milestones; development of a statistically based testing system for developed software;
and establishment of a risk management plan. The Department has appointed the project
manager for the CMS Net enhancement project at the Data Processing Manager III level.
The audit accurately reports that from November 1999 through November 2000, following the
departure of the project manager, the Department hired a contract project manager. During
this period, the Department worked to reclassify the State project manager position. The CMS
Branch recognized that the project needed a higher level manager and submitted a request
to upgrade the position to a Data Processing Manager III on April 11, 2000. This request was
approved on October 4, 2000. The current Data Processing Manager III project manager was
hired on December 20, 2000.
(cid:127) Correct the IT security weaknesses we identified.
The Department remains committed to assuring that its systems maintain the highest levels
of security. In order to assure this, the Department is continuously reviewing its security
procedures to identify weaknesses and approaches to resolving them. The new project
management office will work closely with the Department's IT security officer and the Health
and Human Services Agency Data Center on security issues.
(cid:127) Ensure independent oversight of its projects by hiring IV&V consultants from firms
that are different from those providing other services to the project.
The Department will assure that this recommendation is followed on all future IT projects.
158
Additional Comments
Additionally, the Department has the following comments on the findings of the audit:
(cid:127) The Bureau of State Audits finds an 80 percent cost overrun and a 15 month delay.
The original proposal for this project was written in 1995 but the project was not funded until
1998. The time and cost generated by this unanticipated delay were not included in the
original project plan. In the period between 1995 and the present, there have been a number
of unanticipated events, such as Y2K and the implementation of Healthy Families, that have
impacted the scope of the project. These include the following:
(cid:127) The delay of two years between preparation of the Feasibility Study Report (FSR) and
funding the project resulted in additional costs and extended the timeline for completion of
the project. These time and cost changes were delineated in a Special Project Report
submitted in late 1997.
(cid:127) Amendment of the federal Social Security Act to enact the State Children's Health Insur-
ance Program, known as Healthy Families in California, established new business require-
ments for the CMS Net enhancement. Concurrently, modifications to other State systems
to implement Healthy Families imposed additional changes to the design of the CMS Net
enhancement project.
(cid:127) Y2K remediation and certification of CMS Net required additional time and resources.
(cid:127) The original FSR delineated system modifications to CMS Net in order to interface with
existing State systems. Actual implementation identified the need to make significant
modifications to two other State eligibility systems, the Medi-Cal Eligibility Data System
(MEDS) which had to be converted from month-specific to day-specific dates of eligibility
to reflect the policies of the programs that use CMS Net, and the Statewide Client Index
which required modification in order to receive information from CMS Net.
All changes to the cost and time schedule have been delineated in three Special Project
Reports, all of which have been approved by the Department of Information Technology and the
Technology Investment Review Unit of the Department of Finance. Where indicated, the budget
change process has been used.
159
As a result of the decision to undertake a competitive procurement for the new developer
to complete the remaining components of the CMS Net enhancement and in order to
ensure that all best practices for procurements are met, the completion of the CMS Net
enhancement project will be later than December 2002. The new developer will submit a
revised project plan that will determine the completion date.
(cid:127) The Department is rethinking the technical direction of this project for the remaining
components of CMS Net/E47.
The audit report indicates that a recent assessment required by DOIT and conducted by a
technical consultant concluded that the project as currently planned was technically fea-
sible, but did not represent a sound architectural plan. The audit report indicates that the
consultant reached this conclusion because the software and database management
system were not widely used or easily supportable, and because neither is supported by
the Department's current IT infrastructure.
The Department agrees with the technical consultant's assessment that the software and
database management system used in the CMS Net system is not widely used in the
technology industry. The existing CMS Net system, on which the enhancement is being
built, was acquired by the Department in 1992 as public domain software from a similar
program in San Diego County. This technology is widely used in the health care industry,
both in the private and public sectors. For example, this technology is used in UCLA
Medical Center, University Hospital at Stanford University, Johns Hopkins Hospital in
Baltimore Maryland, and Sunquest Information Systems in Tucson, Arizona.
Acquiring this existing system was a sound decision in 1992 because the system was built
and immediately available, it met the business requirements, and it was a no-cost acquisi-
tion. The CMS Net system continues to meet the program's business needs and is cur-
rently used by 46 counties and the CMS Branch. Support for maintaining this architecture
is available locally and the Department has contracted for support to maintain the current
software and database management system for CMS Net. This technical support includes
regular communication and meetings between the contractors; the Department's Informa-
tion Technology Services Division; and the Health and Human Services Agency Data
Center.
160
The proposed CMS Net enhancement project will add new functions to the CMS Net
System such as authorized provider enrollment and client service authorizations. A com-
petitive procurement will be conducted to select a new developer to develop these func-
tions. This will provide an opportunity for the Department to review available technology
options to assure that the most up-to-date and appropriate architectural platform is used
for the additional components. There have been significant advances in technology since
the CMS Net system was acquired and the options for architectural platforms identified in
the technical consultant's assessment were not considered mature by industry standards
when the CMS Net enhancement project was proposed. The technical consultant's as-
sessment will be an important resource for the Department as the CMS Net enhancement
is developed.
(cid:127) The Department has not hired a new IV & V consultant to replace the IV&V consultant
who resigned in August 2000.
When a development contract is selected, a new IV&V consultant will be hired.
Comments on the Ratings (Table 5)
The Department's comments below address only those areas rated as Weak.
Planning and Procurement
♦♦♦♦♦ Outline the business problem, allow vendor to propose solutions.
The procurement process for a new developer for the CMS Net enhancement project
will meet this best practice.
Additionally, the Department will include this practice in the guidelines to be established
by the new project management office for Department IT initiatives.
♦♦♦♦♦ Sponsor the project through appropriate commitment and involvement of man-
agement, and include sufficient resources.
The auditor reports that this weakness refers to staff assignments to support both the
existing CMS Net system and the CMS Net enhancement project. The Department will
continue its efforts to provide needed resources to support this project.
161
♦♦♦♦♦ Base procurement on best value, not lowest cost.
The Department has already determined that an alternative procurement process based
on best practices will be used in selecting a new developer for remaining components of
the CMS Net enhancement project.
The Department will include this practice in the guidelines that the new project manage-
ment office will establish for Department IT initiatives.
♦♦♦♦♦ Use a vendor that provides and maintains sufficient qualified staff.
The Department intends to establish criteria for sufficient qualified staff in selecting a
new developer for the CMS Net enhancement project.
The Department will include this practice in the guidelines that the new project manage-
ment office will establish for Department IT initiatives.
♦♦♦♦♦ Require letters of credit from the vendors on a large project.
The procurement process for a new developer for the CMS Net enhancement project
will meet this best practice.
Additionally, the Department will include this practice in the guidelines that the new
project management office will establish for Department IT initiatives.
♦♦♦♦♦ Write strong contracts to adequately protect the State.
Under the procurement process for a new developer, the CMS Net enhancement project
will meet this best practice.
Additionally, the Department will adopt contract best management practice guidelines to
be developed by the new project management office.
Design, Development, and Implementation
♦♦♦♦♦ Develop an adequate security system to detect and prevent inappropriate access.
The Department remains committed to assuring that its systems maintain the highest
levels of security. In order to assure this, the Department is continuously reviewing its
security procedures to identify weaknesses and approaches to resolving them. The
Department's new project management office will work closely with the IT security officer
and the Health and Human Services Agency Data Center on security issues.
Quality Assurance
♦♦♦♦♦ Pay the vendor only on acceptance of tested project deliverables.
The contract for the new CMS Net enhancement developer will include provisions that
reimburse vendors only when the Department accepts tested deliverables.
The Department will include this practice in the guidelines that the new project manage-
ment office will establish for Department IT initiatives.
162
Employment Development Department
June 13, 2001
Ms. Elaine M. Howle
State Auditor
555 Capitol Mall, Suite 300
Sacramento, CA 95814
Dear Ms. Howle:
This letter contains the Employment Development Department's (EDD) response to the Bureau
of State Audit's (BSA) review of the TEAM project. The EDD agrees with the BSA's findings. For
clarity, each BSA recommendation statement is included below, followed by EDD's response.
Recommendation: Ensure that the vendor provides sufficient staff with the necessary
training and experience.
On future projects, the EDD will require that vendors provide sufficient, adequately skilled staff
necessary to complete the project within the required time frame. In addition, the EDD will review
vendor staffing throughout the project to ensure appropriate staffing levels are maintained.
Additionally, for future contracts of this type, the EDD will consider strengthening contract provi-
sions that will compel the vendor to provide sufficient skilled staff throughout the project.
Recommendation: Use an effective project management plan before beginning to de-
velop each project so it can monitor the progress of the projects.
Throughout the life of the TEAM Project, the EDD continuously focused on ensuring that the
project management planning methods and practices used provided a framework to assist in the
successful completion of this project. The EDD requested Logicon (TEAM's IV&V consultant) to
provide a final project closure assessment including key issues, lessons learned, and recommen-
dations. This review was presented to the EDD and the Department of Information Technology
on May 18, 2001. In addition, the project team plans to develop a project assessment document
that will be used, along with the BSA and Logicon recommendations, to assess steps necessary
to further strengthen our project management and development methods and practices.
163
Ms. Elaine Howle
June 13, 2001
Page two
We will also continue to review our project management and development methods and practices
to reduce the risks and provide a framework to assist project managers in successfully complet-
ing projects on time and within budget.
Recommendation: Ensure that it establishes and uses a process to control and monitor
project scope changes that requires changes to be adequately reviewed before they are
made.
As stated in the audit report, the EDD did make changes to strengthen our project scope change
control review and approval process during the TEAM project. We plan to closely monitor and
control scope changes for future projects. The strong project management plan (described
earlier) will assist with monitoring progress and controlling scope changes.
Recommendation: Correct the IT security weakness we identified.
We agree with the audit finding that security of the TEAM system could be improved. As a part of
its e-government strategy, the EDD recognizes the need for increased security across the enter-
prise. As part of the Expanding Access to EDD Services (EASE) Feasibility Study Report (FSR),
the Department has recommended significant changes and improvements to security processes
and procedures, as well as, technology changes to all systems running at the EDD that would
provide increased levels of security. The security functionality would be managed by a central-
ized EDD security organization that is yet to be established. The security organization will have
responsibility for processes, procedures, and practices to monitor all activities (authorized and
unauthorized) to EDD's automated systems. The EASE is currently undergoing a funding deci-
sion by EDD management. Although the projected date for implementing a fully functioning
security organization in EDD is June 2002, until the EASE project funding issue is resolved, the
target implementation date for technical and administrative security changes has not been set.
The major security components to be added as part of EASE are:
(cid:127) Technical detailed security architecture design
(cid:127) Security Incident Reporting
(cid:127) Security Standards for Servers Desktops and Modems
(cid:127) Security Awareness Training and Education
(cid:127) Improved Business Continuity
(cid:127) Network Content Filtering
(cid:127) Development of Security Guidelines into the System Development Life Cycle
164
Ms. Elaine Howle
June 13, 2001
Page three
(cid:127) Secure Mobile computing environment
(cid:127) Improve Security Organization
(cid:127) Authentication services
(cid:127) Access control
(cid:127) Network monitoring
(cid:127) Intrusion detection
Aside from the funding and implementation of the solutions identified in the EASE FSR, some
changes could be made to the TEAM system that would improve security. These changes involve
software upgrades and increasing capacity to expand security functions. However, no funding
currently exists for these changes. Furthermore, because the security infrastructure proposed
with the EASE FSR will impact all of EDD's systems, we prefer to invest in this enterprise ap-
proach rather than investing in specific systems individually.
If you have questions about this response, please call Pam Harris at 654-7014.
Sincerely,
(Signed by: Sam Rodriguez for)
MICHAEL S. BERNICK
Director
165
Blank page inserted for reproduction purposes only.
166
Agency’s comments provided as text only.
State and Consumer Services Agency
Office of the Secretary
915 Capitol Mall, Suite 200
Sacramento, CA 95814
June 14, 2001
Elaine Howle, State Auditor
Bureau of State Audits
555 Capitol Mall, Suite 300
Sacramento, California 95814
Dear Ms. Howle:
SUBJECT: AUDIT REPORT NO. 2000-118
Enclosed is our response prepared by the Franchise Tax Board to the Bureau of State Audits’
Report No. 2000-118 in which a portion of the report is related to an information technology
project managed by the Board. A copy of the response on a diskette is also included.
If you have any questions or need additional information, please contact me at
653-4090.
Sincerely,
(Signed by: Clothilde V. Hewlett)
Clothilde V. Hewlett
Undersecretary
Enclosures
167
Franchise Tax Board
P.O. Box 115
Sacramento, CA 95741-0115
M E M O R A N D U M
To: Aileen Adams, Secretary June 14, 2001
State and Consumer Services
915 Capitol Mall, Room 200
Sacramento, California 95814
From: Gerald H. Goldberg
Subject: Audit Response (2000-118)
Franchise Tax Board (FTB) has prepared the following response to the excerpts from the draft
audit report from the Bureau of State Audit for the Accounts Receivable Collection system
(ARCS).
The Accounts Receivable Collection System (ARCS) was designed to create new benefits
through a common systems approach that would consolidate and bring full automation to the
tax programs, institute standard, proven modeling capability and minimize duplication of effort
in cross-training and operational burdens among the collection programs. The ARCS project
utilized the benefits of a performance-based procurement. The department worked jointly with
the business partner to design and develop the new system. Payments to the business
partner were based on tangible benefits achieved by the new integrated system. The benefits-
based funding strategy shifts a large portion of the risk of the project's success to the business
partner.
The ARCS project costs were estimated at $33 million, with increased revenues (benefits) of
$76.5 million and an implementation schedule of June 2000. After detailed system designs
were developed changes to the baseline functionality became apparent. In order to comply
with legislation and incorporate the necessary changes to the system implementation, the
schedule was extended. This change in the schedule was necessary for a fully functional
system to meet the user needs. The extended schedule allowed FTB to include the necessary
additional business functionality that better met the business needs of our users and positioned
the department to meet the ongoing business needs. As a result of the changes to the sched-
ule, the cost estimate was revised to $36.260 million, 9.8 percent more than the original
estimate. ARCS was completed in March 2001 with benefits far exceeding the original esti-
mates. ARCS has collected over $150 million in new revenue which would not have been
collected under the previous system. ARCS is expected to collect an additional $35 million
annually in new revenue.
168
Aileen Adams
Page 2
06/14/01
This response has been saved in the requested format on the diskette furnished by the Bureau
of State Audit. If you need additional information, please contact Janet Sherwood of my staff
at (916) 845-5530.
(Signed by: Gerald H. Goldberg)
Executive Officer
169
cc: Members of the Legislature
Office of the Lieutenant Governor
Milton Marks Commission on California State
Government Organization and Economy
Department of Finance
Attorney General
State Controller
State Treasurer
Legislative Analyst
Senate Office of Research
California Research Bureau
Capitol Press
170