April 2013
City of San Diego
Although It Generally Followed Requirements for
Reviewing Permits, It Could Do More to Protect
Historical Resources and to Notify the Public Properly
About Its Actions
Report 2012‑109
COMMITMENT
INTEGRITY
LEADERSHIP
The first five copies of each California State Auditor report are free. Additional copies are $3 each, payable by check
or money order. You can obtain reports by contacting the California State Auditor’s Office at the following address:
California State Auditor
555 Capitol Mall, Suite 300
Sacramento, California 95814
916.445.0255 or TTY 916.445.0033
OR
This report is also available on our Web site at www.auditor.ca.gov.
The California State Auditor is pleased to announce the availability of an online subscription service.
For information on how to subscribe, visit our Web site at www.auditor.ca.gov.
Alternate format reports available upon request.
Permission is granted to reproduce reports.
For questions regarding the contents of this report,
please contact Margarita Fernández, Chief of Public Affairs, at 916.445.0255.
For complaints of state employee misconduct, contact the California State Auditor’s
Whistleblower Hotline: 1.800.952.5665.
Elaine M. Howle State Auditor
Doug Cordiner Chief Deputy
April 25, 2013 2012-109
The Governor of California
President pro Tempore of the Senate
Speaker of the Assembly
State Capitol
Sacramento, California 95814
Dear Governor and Legislative Leaders:
As requested by the Joint Legislative Audit Committee, the California State Auditor (state auditor) presents this
audit report concerning the City of San Diego (San Diego) and its compliance with existing laws and regulations
when it issues permits. San Diego’s Development Services Department (Development Services) is responsible
for managing the majority of San Diego’s review of development projects, and it issues permits that allow
construction or development within the city.
This report concludes that Development Services generally followed applicable requirements when it reviewed
permits. However, Development Services cannot be certain that all project sites that require historical resource
reviews are receiving those evaluations. Specifically, Development Services relies on the applicants seeking
permits to provide information about the historical resources at the applicants’ project sites, but it does
not require them to supply documentation that supports the information on the applications. The City of
San Diego Municipal Code (municipal code) requires Development Services to review all projects that include
modification to structures that are 45 or more years old for potential designation as a historical resource.
Of the 19 projects we examined, five had applications that lacked the year of construction for the structures
on the project sites and 10 had applications with information that conflicted with the records of the County of
San Diego’s assessor/recorder/county clerk (county). Consequently, Development Services risks not identifying
project sites with potential historical resources.
Development Services did not consistently adhere to the municipal code when it approved four of the
10 construction changes to building permits we reviewed. Development Services did not require building
permits for two construction change projects that involved adding new structures, as the municipal code
requires. Moreover, Development Services did not require a construction permit, or perform a historical
resource review to ensure the changes were consistent with the U.S. Secretary of the Interior’s Standards for
Rehabilitation, for a project with a structure located within a historic district, as the municipal code requires.
For these three construction change projects, Development Services stated that it followed its Information
Bulletin 118, issued in June 2011, which describes its process for construction changes to approved plans.
However, Development Services’ information bulletins cannot supersede the municipal code requirements.
Development Services is also responsible for assessing projects in accordance with the California Environmental
Quality Act (CEQA). We reviewed six projects that were subject to CEQA and found that Development Services
did not always provide the public with proper notice as required by state regulations that implement CEQA,
known as the CEQA guidelines. In particular, the CEQA guidelines specify that, within five days of the final
approval of a project, an agency must prepare and file a Notice of Determination (determination notice) with
the county. Of the six projects, Development Services either did not file the determination notice or did not file
it in a timely manner for four of these projects.
Finally, Development Services did not ensure that certain employees disclose their financial interests on the
Statement of Economic Interests, commonly known as Form 700, in accordance with the Political Reform Act
of 1974 in a timely manner. Specifically, Form 700s submitted by four of the 15 employees we selected for review
were between one month and more than 12 months late.
Respectfully submitted,
ELAINE M. HOWLE, CPA
State Auditor
555 Capitol Mall, Suite 300 Sacramento, CA 95814 916.445.0255 916.327.0019 fax www.auditor.ca.gov
Blank page inserted for reproduction purposes only.
California State Auditor Report 2012-109 v
April 2013
Contents
Summary 1
Introduction 7
Audit Results
The Development Services Department Generally Followed Proper
Processes, but Did Not Ensure That All Relevant Projects Received
Historical Resource Reviews 19
Development Services Inappropriately Processed Construction
Changes to Building Permits 26
Development Services Did Not Consistently Comply With Certain
Public Notice Requirements 29
Development Services Has Not Ensured That Its Designated
Employees Assuming or Leaving Office Disclose Their Economic
Interests in a Timely Manner 35
San Diego’s Ethics Commission Did Not Comply With the City Council’s
Policy on Administering Ethics Training for Certain Employees 37
Recommendations 38
Appendix A
The California State Auditor’s Selection of Construction and
Development Permits Issued by the City of San Diego 41
Appendix B
The City of San Diego’s Average Lengths of Time for Issuing
Building, Site Development, and Conditional Use Permits
Between January 1, 2010, and September 17, 2012 47
Responses to the Audit
City of San Diego, Mayor’s Office 53
City of San Diego, Ethics Commission 55
California State Auditor’s Comment on the Response From
the City of San Diego’s Ethics Commission 57
vi California State Auditor Report 2012-109
April 2013
Blank page inserted for reproduction purposes only.
California State Auditor Report 2012-109 1
April 2013
Summary
Results in Brief Audit Highlights . . .
In reviewing permits applicable to construction and development Our review of the permit review process
projects for the City of San Diego (San Diego), its Development for the City of San Diego (San Diego) found
Services Department (Development Services) generally followed that its Development Services Department
applicable requirements. However, Development Services did (Development Services):
not collect sufficient information to ensure that all appropriate
projects underwent reviews to determine whether the project » Generally followed San Diego’s permit
sites possess historical resources, make certain that the public review process.
receives mandatory notices about environmental determinations
» Did not collect sufficient information
for approved projects, or verify that each employee required to
to ensure that all appropriate projects
complete a Statement of Economic Interests, commonly known
underwent reviews to determine
as Form 700, submits the form at the appropriate time. As a
whether the project sites possess
result, Development Services did not consistently meet state and
historical resources. Specifically, of the
municipal requirements imposed upon it.
19 applications for projects in San Diego
that we examined, five had incomplete
Development Services is responsible for managing the majority of
information on historical resources,
San Diego’s review of development projects, and it issues permits
and in 10 the information provided
that allow construction or development within the city. The City of
conflicted with the records of the County of
San Diego Municipal Code (municipal code) defines development
San Diego’s assessor/recorder/county clerk.
generally as any act dividing a parcel, adding or altering existing
facilities, or changing the layout or vegetation of the land. Each » Did not consistently adhere to the City of
development project requires either an approval or a permit. In San Diego Municipal Code when approving
addition, the municipal code specifies that construction permits, four of the 10 construction changes
which constitute one category of permits, must undergo a ministerial we reviewed.
review process, which involves determining whether the project
» Did not make certain that the public
meets a series of predetermined requirements and involves little
receives mandatory notices about
or no personal judgment by the public official. The other category
environmental determinations for
of permits, development permits, is subject to discretionary review
approved projects.
processes, which require decision makers to exercise judgment and
deliberation when deciding to approve or disapprove a project.
• For three of the six projects we
reviewed that were subject to the
Although Development Services generally followed San Diego’s
California Environmental Quality
permit review processes, it cannot be certain that all project
Act, Development Services filed the
sites that require historical resource reviews are receiving those
Notice of Determination between
evaluations. The U.S. Secretary of the Interior establishes standards
12 business days and more than
for rehabilitation of historical resources, and Development Services
90 business days late.
reviews permit applications for projects that involve designated and
potential historical resources to ensure that the projects comply with • Development Services does not post a
those standards.1 The municipal code requires Development Services Notice of Right to Appeal Environmental
to review all projects that include modification to structures that are Determination for projects that have
45 or more years old for potential designation as a historical resource. been reviewed by hearing officers
Development Services relies on the applicants seeking permits to because it believes it is not required to
do so.
continued on next page . . .
1 The City of San Diego’s Historical Resources Board designates certain sites and districts as
historical resources.
2 California State Auditor Report 2012-109
April 2013
» Did not verify that each employee provide information about the historical resources at the project
required to complete a Statement of sites, but it does not require applicants to supply documentation
Economic Interests, commonly known that supports the information on the applications. In fact, of the
as Form 700, submits the form at the 19 applications for projects in San Diego that we examined, five had
appropriate time. Specifically, four of incomplete information on historical resources, and in 10 the
the 15 Development Services designated information provided conflicted with the records of the County of
employees we selected for review San Diego’s assessor/recorder/county clerk (county). Consequently,
submitted their Form 700, required Development Services risks not identifying project sites with potential
upon assuming or leaving office, historical resources.
between one month and more than
12 months late. In the case of the five projects with incomplete information about
potential historical resources, the projects’ general applications
» Our review of the City of San Diego’s
lacked the year of construction for the structures on the project sites.
Ethics Commission found that it does not
Of these five projects, only two received a historical resource review
ensure employees who must attend ethics
by Development Services, because its staff had prior knowledge of
training do so biennially by March 31, as
the project sites. The historical resource reviews that Development
the policy of the San Diego City Council
Services performed appear to comply with processes outlined in the
requires. Six of the seven employees
municipal code and San Diego’s Land Development Manual.
we selected for review attended the
required ethics training between four and
Our review of 10 construction changes to building permits found that
18 months after the March 31 deadline.
Development Services did not consistently adhere to the municipal
code when approving four of these changes. One project involved
adding a chain‑link fence that was taller than allowed without a
building permit, and the second involved adding a retaining wall that
similarly should have had a building permit due to its height. Although
Development Services referred us to its Information Bulletin 118,
issued in June 2011, which describes its process for construction
changes to approved plans, it did not specifically address our concern
that the height of the structures did not conform to the municipal
code requirements. Two other construction change applications
that should have received a historical resource review did not. For
one of these projects, Development Services staff indicated that the
changes were minor and did not require a historical resource review
in accordance with Information Bulletin 118. However, this decision is
inconsistent with the municipal code. Further, Development Services’
information bulletins, which are free publications that provide the
public with certain information, cannot supersede the municipal code
requirements. For the second, Development Services staff were unable
to explain why a historical resource review was not conducted.
Development Services is also responsible for assessing projects
in accordance with the California Environmental Quality Act
(CEQA). Among other objectives, the purpose of CEQA is to
inform governmental decision makers and the public about projects’
potentially significant environmental impacts. Of the 19 projects
we reviewed, nine related to development permits. Three of the
nine projects were exempt from CEQA. For these three projects,
Development Services generally complied with the applicable CEQA
public notice requirements for exempt projects.
California State Auditor Report 2012-109 3
April 2013
However, for the six projects subject to CEQA, Development
Services did not always provide the public with proper notice. The
CEQA guidelines—the state regulations that implement CEQA—
specify that within five days of the final approval of a project, an
agency must prepare and file with the county clerk a Notice of
Determination (determination notice), which remains posted for
30 days.2 The determination notice describes the project, states
that the determination was made pursuant to CEQA, and indicates
whether any mitigation measures must be undertaken as a condition
of approval. For one of the six projects we reviewed that was subject
to CEQA, Development Services did not file a determination notice.
For three other projects we reviewed that were subject to CEQA,
Development Services filed the determination notices between
12 business days and more than 90 business days late.
Each of the project managers for these three projects believes that
the delays occurred because the applicants did not submit the filing
fee for their determination notice in a timely manner. According to
the assistant deputy director for project management, Development
Services requires applicants to submit a check made payable to
the county clerk to cover the filing fees for the determination
notice. However, the CEQA guidelines do not provide exceptions,
including late payment of the filing fee, to the requirement that the
determination notice be filed within five days of the final approval of a
project. When a determination notice is not filed or filed significantly
late, the public may be unaware that a determination has been made,
and therefore it may not exercise its right to challenge the decision.
In addition, the municipal code requires Development Services to
post a Notice of Right to Appeal Environmental Determination
(appeal notice) for projects following certain discretionary permit
review processes. However, Development Services does not post
these appeal notices for projects that have been reviewed by
hearing officers, because it believes it is not required to do so. We
disagree with this conclusion because it is inconsistent with the
municipal code. Although the assistant deputy director stated that
Development Services intends to clarify the municipal code to
align with its practice, Development Services is not complying with
the municipal code as currently written. As a result, the public is
not receiving proper notice of its ability to appeal environmental
determinations made by the hearing officers.
Development Services is also subject to certain state and municipal
code requirements regarding conflicts of interest. Specifically,
certain Development Services employees—whose positions are
2 Because CEQA guidelines refer to each jurisdiction’s county clerk, this discussion uses the title
county clerk to refer to the county.
4 California State Auditor Report 2012-109
April 2013
designated in Development Services’ conflict‑of‑interest code—must
disclose their financial interests on Form 700 in accordance with
California’s Political Reform Act of 1974 (Political Reform Act). The
Political Reform Act requires public employees to file a Form 700
within 30 days of assuming or leaving a designated position. However,
four of the 15 Development Services designated employees we selected
for review submitted their Form 700 required upon assuming or leaving
office between one month and more than 12 months late. These delays
occurred because Development Services’ filing liaisons consistently
failed to notify the Office of the City Clerk (city clerk) about employees
who were leaving or assuming designated positions. One of the filing
liaisons stated that they are not always aware of employees who assume
or leave a designated position because they rely on Development
Services’ payroll staff to provide them with this information. The filing
liaison also stated that the liaisons are working with the payroll staff
to develop procedures to ensure that they effectively communicate
information on employees who assume or leave a designated position.
Until Development Services implements these procedures, the city clerk
cannot ensure that it collects the Form 700s required upon assuming
and leaving office from all designated employees in a timely manner.
Finally, the City of San Diego Ethics Commission (commission) does
not ensure that employees who must attend ethics training do so
biennially by March 31, as the policy of the San Diego City Council
(city council) requires. San Diego’s municipal code states that the
commission is responsible for providing training and education on
governmental ethics laws, such as local laws that govern conflicts
of interest and financial disclosure. However, six of the seven
employees we selected for review attended ethics training between
four and 18 months after the March 31 deadline. The program
manager believes the commission maintains the spirit of the policy
by providing the training shortly after an employee becomes subject
to the commission’s jurisdiction and every two years thereafter.
However, until the commission seeks and obtains changes to the
city council’s policy to align the policy with its current practice, it is
not complying with the policy and is not meeting the city council’s
expectations for enforcement of its ethics training requirement.
Recommendations
To ensure that it properly identifies potential historical resources for
the structures on project sites and conducts reviews in accordance
with the municipal code, Development Services should require
applicants to submit documentation, such as the county’s property
records, with their applications or it should obtain the information
directly from the county so that it can determine whether the project
requires a historical resource review.
California State Auditor Report 2012-109 5
April 2013
To comply with the municipal code requirements for construction
permits such as building permits, Development Services should
align Information Bulletin 118, issued in June 2011, which describes
its process for construction changes to approved plans, with the
municipal code requirements for issuing permits and conducting
historical resource reviews.
To provide the public proper notice of San Diego’s environmental
determinations within five days of the final approval of a project in
accordance with the CEQA guidelines, Development Services should
develop procedures to ensure that its staff file the determination
notices in a timely manner. For example, to avoid delays, Development
Services should require its staff to collect and submit to the county
the filing fee for each determination notice within five days of the final
approval of the project.
To provide the public proper notice of San Diego’s environmental
determinations in accordance with the municipal code,
Development Services should seek an amendment to the municipal
code to clarify its belief that environmental determinations made by
a hearing officer are not subject to the appeal notice requirement.
In the interim, Development Services should post appeal notices for
projects subject to review and approval by the hearing officer.
To ensure that its designated employees disclose their financial
interests in a timely manner, Development Services should do
the following:
• Make certain that its filing liaisons and payroll staff develop and
implement procedures for notifying the filing liaisons when
designated employees assume or leave their positions.
• Ensure that the filing liaisons promptly notify the city clerk when
designated employees assume or leave their positions.
To make sure that certain employees attend ethics training as
required by the city council, the commission should either follow
the city council’s policy or seek a change to align the policy with its
current practice.
Agency Comments
San Diego’s mayor believes all of our recommendations are
reasonable and appropriate and states that San Diego will
implement them.
6 California State Auditor Report 2012-109
April 2013
Although the commission disagrees with our conclusion that it is not
meeting the city council’s expectations, it agrees with our conclusion
that its training program does not align with the city council’s policy
for providing ethics training to employees biennially by March 31. The
commission states that it will ask the city council to amend its policy
and remove the language concerning the March 31 deadline.
California State Auditor Report 2012-109 7
April 2013
Introduction
Background
Covering roughly 340 square miles of land area, with 70 miles of
coastline and a shared border with Mexico, the City of San Diego
(San Diego) has a population of 1.3 million people, according to
the California Department of Finance’s January 2012 population
estimates. San Diego operates under its own charter adopted by
voters in 1931.
Like all California cities, San Diego has very broad power to
regulate land use within its boundaries. State law, namely the
California Planning and Zoning Law, sets out the framework
San Diego must follow and requires that it adopt a general plan.
The general plan provides a process through which every city and
county may coordinate its local decisions for resource allocation
with decisions regarding community development and local land
use planning. San Diego comprehensively updated its general plan
in 2008, with amendments to certain elements in 2010 and 2012.
State law authorizes a general plan to contain “community plans”
that cities and counties can use to plan the future of a particular
area of the city or county with more detail than in the general plan.
San Diego has relied on this authority to develop 55 community
plans for various areas of the city.
Land Development in San Diego
The City of San Diego Municipal Code (municipal code) reflects the
broad land use planning and development regulatory authority
that derives from the California Constitution and state law, as
well as the requirements that various environmental laws, such as
the California Environmental Quality Act (CEQA), impose, and
it prescribes the various processes that San Diego uses to make
land use decisions, including land development decisions. The
municipal code generally defines development as any act dividing a
parcel, adding or altering existing facilities, or changing the layout
or vegetation of the land, and it requires the review of development
in San Diego to help ensure the protection of the public’s health,
safety, and welfare. As of March 2013 San Diego had more than
10,000 city employees, 437 of whom worked for its Development
Services Department (Development Services), which is responsible
for managing the majority of San Diego’s review of development
projects. Figure 1 on the following page shows Development
Services’ organization and the responsibilities of its divisions.
8 California State Auditor Report 2012-109
April 2013
1
erugiF
tnemtrapeD
secivreS
tnempoleveD
s’ogeiD
naS
fo
ytiC
eht
fo noitazinagrO
rotceriD
tnatsissA
tnempoleveD
cimonocE
ygolonhceT
noitamrofnI
noitcurtsnoC
gnidliuB
ecivreS
remotsuC
dna
ecnaussI
timreP
tnemeganaM
tcejorP
dna
noitartsinimdA
sdroceR
dna
ytefaS
dna
gninnalP
yciloP
dna
tnemecrofnE
edoC
gnisuoH
lliF-nI/elbadroffA
ecnailpmoc
tcA
nworB
sreihsaC
ggnniirreeeenniiggnnee
lliivviiCC
enil
tnemtnioppA
evitartsinimdA
gnidliuB
elbaniatsuS
dna
secivres
noitartsinimda
tegduB
gnissecorp
ataD
nnooiittaanniibbmmooCC
gninnalp
ediwytiC
margorP
etidepxE
troppus
nnooiittcceeppssnnii
ecrof
ksat detamotuA
tnuocca
tisopeD
ni-kcehc
remotsuC
ecnanfi
ssenisuB
noitartsinimda
tnemeganam
seitilicaF
wweeiivveerr
nnooiittaanniibbmmooCC
dnaL
dna
gnidliuB
ecivres
remotsuC
tnempoleved
ytinummoC
edoC
tnempoleveD
sisylana
eeF
gnikcarT
tcejorP
yyggoollooeeGG
tnarg
kcolb
nalp
lareneG
*noitagitsevni
tnempoleved
metsyS
secivres
laicnaniF
ttnnoorrff
nnooiittcceeppssnnII
gnirotinom
tnemesrubmier
tsoC
tnemecrofne
edoC
gnisahcruP
ffffaattss rreettnnuuoocc
stcirtsid
stnarG
stnarG
reenigne
sdroceR
ttnneemmeeggaannaamm
ttcceejjoorrPP
eef
tcapmi
repoleveD
lloryaP
snoitaler
aideM
ekatni
tnialpmoC
nnoossiiaaiill
sssseenniissuubb llllaammSS
ygetarts
gnicnanfi
tfarD
tnemerucorP
gninnalp
kraP
tnemecrofnE
secivres
htworg
cimonocE
stcartnoc
dna
,,llaacciirrttcceellee
,,llaarruuttccuurrttSS
snoitacilbuP
noitanidrooc
llaacciinnaahhcceemm
ddnnaa
tfieneb
ytilicaF
gnisahcruP
ssnnooiittcceeppssnnii
noitamrofni
cilbuP
lortnoc
itffiarG
tnemssessa
secivres
troppuS
,,llaacciirrttcceellee
,,llaarruuttccuurrttSS
stcejorp
laicepS
ecnaussI
)gnidliub/gnireenigne(
troppus
gniraeH
eerrfifi ddnnaa
,,llaacciinnaahhcceemm
gniniarT
sskkcceehhcc nnaallpp
tnemecrofne
lacoL
dnuf tsurt
gnisuoH
ycnega
ddnnaa ttrrooppppuuss
llaacciinnhhcceeTT
ssenisuB
llamS
fo
ecffiO
ssrroottcceeppssnnii
llaaiicceeppss
snalp
retsaM
tnemeganam
tcejorP
yytteeffaass ccffiffiaarrTT
retnuoc-eht-revO
)yranoitercsid(
putes
tcejorp
gnicnanfi
seitilicaf
cilbuP
dna
gnissecorp
nalP
setadpu
nalp
noitubirtsid
stcejorp
cilbuP
serudecorP
noitatropsnarT
lanoigeR
lattimbus
tcejorP
margorP
tnemevorpmI
gnikcarT
tcejorP
tnemesrubmieR
selbat
metsyS
stnemeerga oyees
pl m
1 e 7
oyees
pl m 5 e
1
oyees
pl m 7 e 1
oyees pl m 9 e 3 1
oyees
pl m
6
e
1
oyees
pl m 4 e
9
gnireenignE
dna
gninnalP
decnavdA gnisserddA
ytilibitapmoc
tropriA
nalp
retsam
nairtsedep
dna elcyciB
setadpu
nalp
ytinummoC
yraterces
evitucexe
rotcerid
ytupeD
noitamrofni
timrep
dna
tnempoleveD
weiver
gnireenignE
weiver
latnemnorivnE
snoitangised
ytreporp
cirotsiH
stcirtsid
dna syevrus
cirotsiH
draoB
secruoseR
lacirotsiH
seicepS
elpitluM
dna
ecruoseR
lacirotsiH
sweiver
tcejorp
margorP
noitavresnoC
tnempoleved
ytinummoc
dna gnisuoH
weiver
epacsdnaL
gnirotinom
timrep
mret-gnoL kcehc paM
noitcepsni
dna
stnemeerga
tcA slliM
gninnalp
ytiliboM
margorP
noitavresnoC
seicepS
elpitluM
noitisiuqca
ecaps nepO
hcraeser
cimonoce
dna gninnalP
troppus
puorg
gninnalP
weiver
gninnalP
sweiver
tcejorP
syevrus
dlefi
tnemtrapeD
skroW cilbuP
stcejorp
laicepS
tnempoleved
noitatropsnarT
margorP
noitavresnoC
tatibaH
looP lanreV oyees pl m 3 e 8
seitilibisnopseR
mrofer
yrotalugeR
tnempoleveD
dnaL
*etadpu
edoC
oyees
pl m 2 e
tnempoleveD rotceriD
secivreS
.tnemtrapeD
secivreS
tnempoleveD
s’ogeiD naS
fo ytiC
eht rof
,3102 ,8 hcraM
fo
sa
tnuoc
eeyolpme
dna
trahc
noitazinagro
ehT
:ecruoS
”.gnireenignE
dna
gninnalP
decnavdA“
deltit
nmuloc
eht
ni
epyt
ecafdlob
ni
detsil
seitilibisnopser
eht
ot detaler
ssecorp
eht liated
ni
ssucsid
stluseR
tiduA
dna
noitcudortnI
s’troper
ehT
:etoN
.edoC
lapicinuM
ogeiD
naS
fo ytiC eht fo
51
hguorht
11 sretpahc
ot
srefer
edoC
tnempoleveD
dnaL
*
California State Auditor Report 2012-109 9
April 2013
Development projects require either a permit or an approval.
The municipal code identifies four general categories
of permits and approvals: construction permits, development
permits, subdivision approvals, and policy approvals. The
third category, subdivision approvals, regulates the division of
lands and the associated design of improvements, among other
areas. The fourth category, policy approvals, involves requests
to amend existing city policies, such as changing the zoning
designation of a site or amending a community plan. In this audit,
we did not examine Development Services’ compliance with
these two approval categories. Instead, we reviewed some types
of permits within the first two categories—construction permits
and development permits. A construction permit involves a review
of the project’s construction plans, as opposed to a development
permit, which includes a review of the project’s architectural and
site design plans. According to the municipal code, not all projects
require development permits; instead, development permits
apply only to those projects in which relevant regulations may
need supplementing because of conditions specific to the project.
If a project does require a development permit, the approval
of the development permit must occur before Development
Services issues a construction permit. Our audit focused on
building permits, which are a type of construction permit, and
on conditional use and site development permits, which are types
of development permits, as Table 1 on the following page indicates.
San Diego’s Permit Review Processes for Land Use
The municipal code identifies five permit review processes and
generally characterizes the various decisions related to land use
and land development as either ministerial or discretionary. As
Figure 2 on page 11 shows, the type of permit the applicant is
seeking and the nature of the project dictate the review process that
Development Services must follow. The municipal code defines
the term ministerial as “a governmental decision involving little
or no personal judgment by the public official as to the wisdom or
manner of carrying out the project.” A ministerial decision involves
only the use of fixed standards or objective measurements, and the
public official cannot use personal, subjective judgment in deciding
whether or how the project is to be carried out. San Diego has
established clearly defined criteria that must be satisfied before it
can issue a permit, and its staff who make those decisions check
to ensure that those criteria are met but do not exercise any
independent decision making in the case of ministerial reviews.
Construction permits follow permit review Process One, which is a
ministerial process.
10 California State Auditor Report 2012-109
April 2013
Table 1
Two Categories of Project Permits That Applicants in the City of San Diego Can Request
CONSTRUCTION PERMITS* DEVELOPMENT PERMITS
Building Construction, alteration, repair, or improvement Coastal development Development within the coastal overlay
of structures; placement of factory‑built zone or California Coastal Commission’s
housing; and other activities. permit jurisdiction.*
Demolition/removal Demolition or removal of any structure. Conditional use Uses that may be desirable under appropriate
circumstances, but are not permitted in the
applicable zone.
Electrical Installation or alteration of electrical wiring, Neighborhood Development that may be desirable but that
device, appliance, or equipment within a development may have some limited physical impacts on the
structure or premises. surrounding properties.
Grading Earthwork that involves excavating, Neighborhood use New uses, changes to existing uses, or
embanking, filling, or removal or destruction of expansions of existing uses that could have
vegetation under certain circumstances. limited impacts on the surrounding properties.
Plumbing/mechanical Installation or alteration of plumbing, Planned development Development that allows an applicant to request
heating, ventilation, air conditioning, or greater flexibility in applying the regulations than
refrigeration system. would be allowed through a deviation process.
Public right‑of‑way Private construction of public improvements, Site development Development that, because of its site, location,
or construction activity or placement of large size, or some other characteristic, may have
plants on or within a street, alley, or other significant impacts on resources or on the
public right‑of‑way. surrounding area even if developed to conform
with all regulations.
Sign Installation or alteration of signs visible from Variance Development that, because of special
any street, alley, or other public property. circumstances applicable to the property, such
as size or shape, would deprive the property
of privileges enjoyed by other property in
the vicinity and under the same land use
designation and zone.
Source: The City of San Diego Municipal Code (municipal code), Chapter 12, articles 6 and 9.
* The municipal code exempts certain types of projects from construction permit and coastal development permit requirements.
In contrast, other land use decisions that require public officials to
exercise judgment and deliberation when deciding to approve or
disapprove a project are considered discretionary. Development
permits follow permit review processes Two through Five, which
are discretionary processes. Development permits, such as
conditional use and site development permits, can be subject to
different discretionary processes. The municipal code determines
the types of development projects that are subject to each
discretionary permit review process. For example, the municipal
code requires conditional use permits involving plant nurseries
to follow Process Three, but requires botanical gardens and
arboretums to follow Process Four and zoological parks to follow
Process Five. In another example, the municipal code requires
permit review Process Three for site development permits when
environmentally sensitive lands are present, but requires permit
review Process Four for development within historical districts or
when designated historical resources are present.
California State Auditor Report 2012-109 11
April 2013
2
erugiF
stimreP
tnempoleveD
dna
noitcurtsnoC
gniweiveR
rof
sessecorP
eviF
s’ogeiD
naS
fo
ytiC
ecnairav
dna
,tnempoleved
etis
,tnempoleved
dennalp
,esu
lanoitidnoC
:stimreP
fo
sepyT
tnempoleved
etis
dna
,tnempoleved
dennalp
,esu
lanoitidnoC
:stimreP
fo
sepyT
tnempoleved
etis
dna
,tnempoleved
dennalp
,esu
lanoitidnoC
:stimreP
fo
sepyT
stimreP
noitcurtsnoC rof stimreP tnempoleveD rof sessecorP yranoitercsiD
ssecorP lairetsiniM
timreP
ssecorP
weiveR
1
yned
ro
evorppa
ot
noisiced
ffatS
*weiver
level-ffatS
noissimbus
s’tnacilppA
snalp
dna
noitacilppa
fo
ngis
dna
,yaw-fo-thgir
cilbup
,lacinahcem
ro gnibmulp
,gnidarg
,lacirtcele
,lavomer
ro
noitilomed
,gnidliuB:stimreP
fo
sepyT 2
gniraeh
laeppA
fo
ecitoN
rehto
ro tnacilppA
ot noisiced
ffatS
level-ffatS
fo
ecitoN
noissimbus
s’tnacilppA
gninnalp
yb
dleh
cilbup
ot
laeppa
selfi
nosrep
‡yned
ro
evorppa
*weiver
erutuf
snalp
dna
noitacilppa
fo
noissimmoc
†gniraeh
noissimmoc
gninnalp
†noisiced
esu
doohrobhgien
dna
,tnempoleved
doohrobhgien
,tnempoleved
latsaoC
:stimreP
fo
sepyT 3
gniraeh
laeppA
fo
ecitoN
detseretni
ro tnacilppA
gniraeH
fo
ecitoN
level-ffatS
fo
ecitoN
noissimbus
s’tnacilppA
gninnalp
yb
dleh
cilbup
ot
laeppa
selfi
nosrep
recffio
cilbup
*weiver
†noitacilppa
snalp
dna
noitacilppa
fo
noissimmoc
†gniraeh
noissimmoc
gninnalp
‡gniraeh
†gniraeh
4
gniraeh
laeppA
fo
ecitoN
detseretni
ro tnacilppA
gninnalP
fo
ecitoN
level-ffatS
fo
ecitoN
noissimbus
s’tnacilppA
yb
dleh
cilbup
laeppa
selfi
nosrep
noissimmoc
cilbup
*weiver
†noitacilppa
snalp
dna
noitacilppa
fo
licnuoc
ytic
†gniraeh
licnuoc
ytic
ot
‡gniraeh
†gniraeh
5
licnuoc
ytiC
fo
ecitoN
noissimmoc
gninnalP
fo
ecitoN
level-ffatS
fo
ecitoN
noissimbus
s’tnacilppA
‡gniraeh
cilbup
‡gniraeh
noitadnemmocer
cilbup
*weiver
†noitacilppa
snalp
dna
noitacilppa
fo
†gniraeh
†gniraeh
.launaM
tnempoleveD
dnaL
dna
edoC
lapicinuM
ogeiD
naS
fo
ytiC
ehT
:secruoS
ni
tcejorp
eht
weiver
osla
ffatS
.stnemeriuqer
tnaveler
ot
serehda
tcejorp
eht
rehtehw
enimreted
ot ,sweiver
ecruoser
lacirotsih
dna
gnireenigne
larutcurts
sa
hcus
,sweiver
sedulcni
weiver
level‑ffatS
*
tnacfiingis
yna
gnibircsed
stnemucod
eraperp
yam
dna
seussi
latnemnorivne
laitnetop
yna yfitnedi
ot
yduts
laitini
na
tcudnoc
ffats ,yllacfiicepS
.tcA
ytilauQ
latnemnorivnE
ainrofilaC
eht
htiw
ecnadrocca
s’rekam
noisiced
eht
laeppa
nac
nosrep
yna
dna
,tnemmoc
dna
weiver
rof
cilbup
eht ot
elbaliava
edam
era
,31
egap
no
2 elbaT
ni
debircsed
,stnemucod
latnemnorivne
ehT .foereht
kcal
ro stcapmi
.snoitanimreted
latnemnorivne
fo
slaeppa
sredisnoc
licnuoc
ytic
ehT
.ruoF
dna
,eerhT
,owT
sessecorp
weiver
timrep
ni
tnemucod
latnemnorivne
eht
yfitrec
ro tpoda
ot
noitanimreted
dezingocer
yllaicffio
ot
sa
llew
sa
,etis
tcejorp
eht
fo teef
003
nihtiw
stnanet
dna
,srenwo
ytreporp
,tnacilppa
eht
ot
tnes
era
gniraeh
cilbup
dna
,noisiced
erutuf
,noitacilppa
fo
seciton
,snoitpecxe
niatrec
htiW
†
.spuorg
gninnalp
ytinummoc
.stnemucod
latnemnorivne
eht
sefiitrec
ro
stpoda
rekam
noisiced
tnaveler
eht
,stimrep
detaler
dna
tcejorp
eht
gniyned
ro gnivorppa
ot
noitidda
nI
‡
12 California State Auditor Report 2012-109
April 2013
The decision maker varies depending on the permit review process.
Development Services staff are the decision makers for Process One,
and the public cannot appeal their decisions to any city decision
maker. The different decision makers for the discretionary
permit review processes Two through Five include Development
Services staff, a hearing officer, the planning commission, and
the San Diego City Council (city council). Specifically, for
Process Two, Development Services staff are the decision makers.
For Process Three, hearing officers designated by the mayor are
the decision makers. Hearing officers can be San Diego employees.
For Process Four, the planning commission, which includes
seven members appointed by the mayor, is the decision maker.
Finally, the city council is the decision maker for Process Five.
Applicants can appeal the decisions for all development permits,
excluding those made by the city council.
Development Services staff perform reviews of the application and
the project plans for the five permit review processes to ensure
that the project adheres to development laws and regulations.
For example, Development Services’ advanced planning and
engineering division is responsible for reviewing certain projects
to determine whether the proposed modifications to designated
historical resources on project sites comply with the U.S. Secretary
of the Interior’s Standards for Rehabilitation (Interior’s standards).
The municipal code requires development affecting historical
resources to comply with Interior’s standards, which are intended
to assist in the long‑term preservation of a property’s significance
through the preservation of historic materials and features.
Development Services’ environmental review staff within its
advanced planning and engineering division are responsible for
reviewing projects in accordance with CEQA. The purpose of
CEQA is to inform governmental decision makers and the public
about projects having potentially significant environmental impacts,
to identify ways to prevent significant and avoidable damage to
the environment by requiring changes in projects, and to disclose
to the public the reasons why a government agency approved a
project if significant environmental effects are involved. The CEQA
guidelines are state regulations that implement CEQA. San Diego
incorporated CEQA and its guidelines into its municipal code, and
the city assigned to Development Services the responsibility for their
implementation. Development Services environmental review staff
review the proposed projects and determine their environmental
significance according to the CEQA guidelines. When conducting
their reviews, the environmental review staff first determine whether
a project is exempt from CEQA. They may determine a project is
statutorily or categorically exempt from CEQA. Statutory exemptions
can be found in state law and are projects the Legislature has decided
are not subject to CEQA, such as ministerial projects that are subject
California State Auditor Report 2012-109 13
April 2013
to San Diego’s permit review Process One. Categorical exemptions
can be found in the CEQA guidelines and apply to certain types
of projects, such as those projects that involve negligible or no
expansion of the use of an existing facility.
If a project is subject to CEQA, the environmental review staff
generally conduct an initial study, which is a preliminary analysis to
determine whether a project may produce significant environmental
effects. The initial study provides the environmental review staff
with the necessary information to determine the appropriate
environmental document to prepare. The environmental document
describes whether the project will have a significant impact on the
environment. Table 2 describes the principal types of environmental
documents for projects subject to CEQA.
Table 2
Principal Types of Environmental Documents Prepared for Projects Subject to the California Environmental Quality Act
TYPE OF DOCUMENT CRITERIA FOR PREPARING THE DOCUMENT
Initial study If the project is not exempt from the California Environmental Quality Act (CEQA), the environmental review staff conduct an
initial study, which is a preliminary analysis to determine whether a project may have significant environmental effects.
Negative declaration If the initial study and other information presented to the City of San Diego (San Diego) shows that there is no substantial
evidence that the project will have a significant effect on the environment, the environmental review staff prepare a
negative declaration, which describes the reasons that the project will not have a significant effect on the environment and
why an environmental impact report (EIR), described later, is not required.
Mitigated negative If the initial study identifies that the project would have potentially significant effects on the environment, the applicant
declaration can modify the project to mitigate adverse impacts, and thereby qualify for a mitigated negative declaration. The mitigated
negative declaration includes the reasons the project will have a significant effect on the environment and the mitigation
measures to avoid those effects.
Environmental If the environmental review staff find substantial evidence that the project may have a significant impact on the environment,
impact report* and if the applicant does not modify the project to mitigate the impact such that a mitigated negative declaration would be
appropriate, the environmental review staff requires an EIR. The environmental review staff or a consultant may prepare the EIR.
The EIR is a detailed statement describing the project‘s significant environmental effects and ways to mitigate or avoid the effects.
Addendum The environmental review staff may prepare an addendum to a previous negative declaration or EIR only if changes in the
project do not require the preparation of a subsequent environmental document.†
Sources: California Code of Regulations, Title 14, Section 15000 et seq., and Information Bulletin 401, June 2007, from San Diego’s Development Services
Department.
* The CEQA guidelines state that public agencies should combine, to the extent possible, the process of preparing environmental impact reports
with their existing planning, review, and project approval processes.
† Although state regulations do not specify that an agency may prepare an addendum to a previous mitigated negative declaration, state law and
relevant court decisions acknowledge that an agency may do so.
Controversy Concerning Certain Permits Issued by Development
Services for Property Located in Southeastern San Diego
Development Services issued multiple permits between 2009 and
2012 for property located at 2121 Imperial Avenue in southeastern
San Diego, and one of these permits prompted two lawsuits filed
in 2012. Specifically, on July 8, 2009, a hearing officer approved a
14 California State Auditor Report 2012-109
April 2013
conditional use permit and site development permit to amend an
existing conditional use permit for the Farmers Market project,
which the planning commission approved and Development
Services issued in 2000 for the development of a large retail
and wholesale facility within an existing warehouse structure.
The permits allowed the property owner, Imperial Market
Investors LLC, to continue operating for 25 years an existing large
retail facility, and to include a proposed market and grocery area
of at least 15,000 square feet. When reviewing the Farmers Market
project in 2009, Development Services’ historical resources staff
found that the building was a potential historical resource but
that the property owner’s proposed changes did not include any
alterations to the exterior facades of the building and that the
conditional use permit was consistent with Interior’s standards.
In addition to approving the conditional use and site development
permits, the hearing officer approved an addendum to the negative
declaration issued in 2000; the addendum stated that no substantial
evidence indicated that the project would have a significant effect
on the environment.
Although the hearing officer approved these permits on July 8, 2009,
Development Services did not issue them until roughly 18 months
later. Specifically, Development Services did not forward the
approved permit and resolution approving the permit to the County
of San Diego’s assessor/recorder/county clerk (county) for recording
until February 1, 2011, and the county recorded the permit on the
same day. Development Services stated that the delay in recording
the permit was primarily attributable to the property owner’s delay
in providing adequate funds to cover the project’s deficit deposit
account balance and its desire to resolve the project site’s code
violations. The municipal code requires Development Services to
issue development permits to an applicant within five business days
of the date that it receives the recorded permit from the county.
Development Services believes that the definition of issuance, as it
relates to the municipal code, is when it or another party provides
the recorded permit to an applicant. For the Farmers Market project,
Development Services stated that the land use attorney for Imperial
Market Investors LLC wanted to expedite the process, so he took the
permit documents to the county for recording on February 1, 2011,
and sent the recorded permits to his client on the same day.3
3 Development Services’ Project Tracking System (PTS) indicates it did not issue the permits until
November 28, 2012. Development Services stated that, for discretionary permits, the issuance
date PTS displays is not the official, legally binding issuance date. For the Farmers Market project,
the project manager stated that she had noted that Development Services had not issued the
permits in PTS, so she issued the permits in November 2012.
California State Auditor Report 2012-109 15
April 2013
After the hearing officer’s approval of the development permits in
July 2009, Development Services issued nine construction permits
for 2121 Imperial Avenue. Figure 3 shows the sequence in which
Development Services issued these permits.
Figure 3
Time Line of Recent Construction and Development Permits for 2121 Imperial Avenue
July 2009 Project No. 168264
Allow continued operations of
an existing large retail facility*
December 2011 Project No. 255161
July 2009 Project No. 190281
Perform structural seismic retrofit
Install two illuminated wall signs† and tenant improvements
August 2009 Project No. 191843 January 2012 Project No. 256546
Control traffic† Allow a curb, gutters, driveways,
trenching, resurfacing as well as
August 2009 Project No. 192151 removal and replacement
Install a water heater† of pavement
December 2009 Project No. 198975
Install irrigation and landscaping† April 2012 Project No. 278507
Install a temporary power pole
January 2011 Project No. 177928
June 2012 Project No. 285572
Reduce height of parapets
and tie walls into the roof Allow street closure, parking lane
diaphragm for an unreinforced closure, sidewalk closure, and
masonry retrofit†‡ detour for offsite improvements
2009 2010 2011 2012
Source: Project Tracking System for the City of San Diego (San Diego) Development Services Department (Development Services).
Development permit decided under permit review Process Three.
Construction permit decided under permit review Process One, and issued between July 8, 2009, and September 17, 2012.
Note: Figure 2 on page 11 displays further information about the permit review processes.
* The hearing officer approved the permit for project number 168264 in July 2009, but Development Services did not issue the permit until
February 2011.
† The City of San Diego Municipal Code (municipal code) states that it is unlawful for any applicant to begin work on or to use the property until
Development Services issues the development permit. Development Services stated that these four construction permits did not require the issuance
of a development permit before the applicant began work on the property because the scope of the project was minor or the project needed
to comply with the municipal code requirement for buildings with unreinforced masonry bearing walls. The municipal code does not require
development permits for landscaping projects such as project number 198975.
‡ A parapet is a low wall or railing at the edge of a platform or roof. In construction, a diaphragm is a flat structural unit acting like a deep, thin beam,
and is usually applied to roofs and floors.
The construction permit issued in December 2011 for project
number 255161, known as the Sherman Heights project, became
the subject of two lawsuits filed in San Diego County Superior
Court by the Coalition for Safe and Healthy Economic Progress
(coalition) in April 2012. The coalition alleged in one lawsuit that
San Diego, the property owner, and Steve Julius Construction, Inc.,
violated the municipal code’s development requirements because
the development permits did not authorize the demolition and
new construction of the building and because the defendants
neither sought nor issued a site development permit under permit
16 California State Auditor Report 2012-109
April 2013
review Process Four, which applies to historical resources. In the
other lawsuit, the coalition alleged that these same entities and
Wal‑Mart Stores, Inc., violated provisions of CEQA because the
demolition and new construction activities at the building had
never undergone an environmental review. The two lawsuits
were consolidated in June 2012. As of April 19, 2013, the lawsuit
was pending.
Scope and Methodology
The Joint Legislative Audit Committee (audit committee) directed the
California State Auditor to determine whether San Diego is complying
with existing laws and regulations when issuing permits using the
ministerial and discretionary decision‑making processes. However,
our audit does not render conclusions on the technical aspects of
the projects we reviewed. The audit analysis approved by the audit
committee contains five separate objectives. Table 3 lists these
objectives and our methods for addressing them.
Table 3
Audit Objectives and the Methods Used to Address Them
AUDIT OBJECTIVE METHOD
1 Review and evaluate the laws, rules, and regulations Reviewed relevant state laws and regulations, the City of San Diego Municipal Code
significant to the audit objectives. (municipal code), and the policies and procedures of the Development Services
Department (Development Services) of the City of San Diego (San Diego).
2 For a selection of permit applications and plans Please refer to Appendix B for our methodology and results.
for projects of similar scope and size submitted
to San Diego for approval since January 2010,
determine the length of time from submission of
the application to permit issuance to identify any
unusual trends related to the size, type, and location
(underserved versus more affluent areas) of the
development project.
3 For a selection of permits of similar scope and size Randomly selected 26 permits and changes to building permits issued between
issued or amended since January 2010 (including January 1, 2010, and September 17, 2012. In accordance with the audit objective,
the permits for the Wal‑Mart Stores, Inc., facility), for the Wal‑Mart Stores, Inc., facility, we also selected a building, site development,
evaluate San Diego’s compliance with relevant laws and conditional use permit, as well as a change to a building permit. Please refer to
and regulations by performing the following: Appendix A for our selection methodology and list of permits.
a. Determine whether San Diego followed the • Reviewed Development Services’ procedures for San Diego’s ministerial and
appropriate approval process (ministerial or discretionary permit review processes.
discretionary) based on the type of permit • Reviewed the project files and records for the selected permits to determine
or application approval sought. whether the permit review process was appropriate and was followed.
• Interviewed Development Services staff.
California State Auditor Report 2012-109 17
April 2013
AUDIT OBJECTIVE METHOD
b. Determine whether any amendments • Reviewed the project files and records for the selected changes to building permits
were made to any applications or plans to determine whether Development Services followed the municipal code.
that were approved using the ministerial • Interviewed Development Services staff.
decision‑making process (e.g., ones that did
not require compliance with the California
Environmental Quality Act [CEQA]). For those
amended applications or plans, determine
whether San Diego followed the laws
and regulations related to processing and
approving any amended applications or plans.
c. Determine whether San Diego complied • Reviewed Development Services’ procedures related to its historical resource reviews.
with relevant laws and regulations regarding • Interviewed Development Services staff.
any applications or plans that it determined
• Reviewed the project files and records for the selected permits to determine
involved a historical resource, including a
whether historical resource reviews were applicable.
property in a historical community.
• Determined whether Development Services conducted its historical resource reviews
in accordance with the municipal code and San Diego’s Land Development Manual.
• Compared Development Services’ records to those of the County of San Diego’s
assessor/recorder/county clerk.
d. Determine whether San Diego complied with • Reviewed the CEQA and the related state regulations.
the laws and regulations related to public • Reviewed the municipal code and Development Services’ procedures for providing
notification when processing and approving public notification during its environmental review process.
applications and plans that required compliance
• Interviewed Development Services staff.
with CEQA or involved a historical resource.
• Reviewed the project files and records for the selected conditional use and site
development permits to determine whether Development Services issued the
required public notices.
• Reviewed the public notices to determine whether Development Services included
all required information, met relevant deadlines, and satisfied the required public
review period.
4. Review and evaluate San Diego’s conflict‑of‑interest • Reviewed the Political Reform Act of 1974, San Diego’s ethics ordinance,
policies and procedures to determine whether Development Services’ conflict‑of‑interest code, the code of ethics and ethics
they comply with relevant laws and regulations. training policy of the San Diego City Council (city council), and the San Diego Ethics
Further, determine whether the policies and Commission’s (commission) practices.
procedures are designed to detect and prevent any • Reviewed the 2009 through 2011 Statements of Economic Interests, commonly
conflicts of interest as well as address any that are known as Form 700, submitted by 15 Development Services employees.
identified. Lastly, determine whether San Diego
• Reviewed Development Services’ accounting records to determine whether it made
has appropriately adhered to its conflict‑of‑interest
payments to any organizations disclosed on the 15 employees’ Form 700.
policies and procedures for key employees who
process and approve permits using ministerial and • Reviewed the ethics training records for seven Development Services employees
discretionary review processes. from 2010 through 2012 to determine whether the commission adhered to the city
council’s ethics training policy.
5. Review and assess any other issues that are Reviewed secretary of state and San Diego city clerk records for campaign
significant to San Diego’s permitting process. contributions made by Wal‑Mart Stores, Inc., to official supporters and opponents of
measures considered by San Diego voters in 2010 and 2012.
Wal‑Mart Stores, Inc., contributed $10,000 in 2010 in support of a measure to make
permanent the strong mayor form of governance, to add a city council seat, and to
increase the number of council votes required to override a mayoral veto. In 2012
Wal‑Mart Stores, Inc., contributed $55,000 in support of a measure that changed
retirement benefits for San Diego employees.
Sources: The California State Auditor’s analysis of Joint Legislative Audit Committee audit request number 2012‑109 and the analysis of information
and documentation identified in the table column titled Method.
18 California State Auditor Report 2012-109
April 2013
Assessment of Data Reliability
In performing this audit, we relied upon electronic data files
extracted from the information system listed in Table 4. The
U.S. Government Accountability Office, whose standards we
follow, requires us to assess the sufficiency and appropriateness of
computer‑processed information that is used to support findings,
conclusions, or recommendations. Table 4 shows the results of
this analysis.
Table 4
Methods of Assessing Data Reliability
INFORMATION SYSTEM PURPOSE METHODS AND RESULTS CONCLUSION
City of San Diego To determine the average We performed dataset verification procedures and did not identify any Not sufficiently
Development length of time from issues. In addition, we performed logic testing on key data elements reliable for the
Services Department the submission date of and identified numerous errors related to permit application submittal purposes of
(Development complete building, site dates and assessor parcel numbers. Specifically, we found that PTS this audit.
Services) development, or conditional did not contain a permit application submittal date for 12.4 percent,
use permit applications or 1,101, of the 8,851 building, site development, or conditional use
Project Tracking to the permit issuance permits issued between January 1, 2010, and September 17, 2012.
System (PTS) dates by neighborhood Because the application submittal date is necessary to calculate the
income category. time to permit issuance, we excluded these permits from our analysis.
Data as of
After excluding the 1,101 permits with no application submittal
September 17, 2012
date, as well as 790 permit applications that were submitted before
January 1, 2010, we found that PTS did not contain an assessor parcel
number for 322 permits, or 4.6 percent of the remaining population.
The assessor parcel number contains the map book number, which we
used to determine the neighborhood income category, as explained
in Appendix B. Without an assessor parcel number, we were unable
to identify the neighborhood income category associated with these
permits. As a result, we excluded these permits from our analysis.
Finally, we excluded an additional 46 permits from our analysis.
Specifically, 38 of the 46 permit applications had application submittal
dates that were later than their permit issuance dates, and we could
not identify the neighborhood income category for the remaining
eight permits.
To ensure that the remaining population of 6,592 permits was accurate,
we selected a statistically valid random sample of 29 permits for
testing. However, because this sample contained 28 building permits
and one site development permit, we selected a supplemental
random sample of two additional site development permits and
three conditional use permits. We performed testing on the entire
sample of 34 permit applications by tracing key data elements to
supporting documentation and found numerous accuracy errors in
the fields for permit type, project type, and assessor parcel number.
However, these fields on a hard‑copy application may be incomplete
or inaccurate. Further, Development Services enters corrections for
these errors into PTS but does not make corrections on the hard‑copy
application. Due to the potential for discrepancy between these fields
in the hard‑copy applications and the PTS data, we were not able to
verify the accuracy of the data.
Sources: The California State Auditor’s analysis of various documents, interviews, and PTS data obtained from Development Services.
California State Auditor Report 2012-109 19
April 2013
Audit Results
The Development Services Department Generally Followed Proper
Processes, but Did Not Ensure That All Relevant Projects Received
Historical Resource Reviews
Although the Development Services Department (Development
Services) for the City of San Diego (San Diego) has generally
followed proper processes for reviewing construction and
development permits, Development Services has not ensured that all
project sites were subject to historical resource reviews. Specifically,
our review of 20 permits issued by Development Services found
that it generally complied with the applicable permit review
process. However, Development Services did not collect sufficient
information from the property owners and applicants seeking
construction and development permits to determine whether the
projects’ structures are potential historical resources. As a result,
Development Services risked failing to identify project sites with
potential historical resources. Nonetheless, the historical resource
reviews that Development Services did perform appear to comply
with the processes outlined in the City of San Diego Municipal Code
(municipal code) and its Land Development Manual.
Development Services Appears to Have Complied With San Diego’s
Permit Review Process
Development Services generally adhered to San Diego’s permit review
process. Our review of 20 permits included 10 building permits,
five conditional use permits, and five site development permits. The
20 permits applied to 19 projects; the Farmers Market project,
described in the Introduction on page 14, required two of these
permits. For the permits we selected to evaluate, Appendix A
includes such information as the permit types; the project numbers,
titles, and scope; and the issuance dates. Development Services issued
18 of the 20 permits between January 1, 2010, and September 17, 2012.
As the Introduction explains, the two permits we selected for
the Farmers Market project—a conditional use permit and a site
development permit—were issued after September 17, 2012.
The procedures Development Services used to manage each of the
19 projects we evaluated were generally adequate to ensure that it
followed the requirements of the applicable permit review process.
Under the municipal code, Development Services staff must
complete reviews for projects requiring either a ministerial permit
review process, which involves evaluations according to fixed
standards and objective measurements, or a discretionary permit
review process, which allows officials to exercise judgment or
deliberation when granting approvals. Construction permits follow
20 California State Auditor Report 2012-109
April 2013
Process One, a ministerial review process. In contrast, development
permits follow processes Two through Five, which are discretionary
review processes.
In completing permit reviews for the 19 projects that we examined,
Development Services staff conducted different types of project
reviews. For example, staff performed structural reviews of projects
by examining building and retaining wall plans for compliance with
the municipal code, the California Building Code, and other related
codes and standards. In the case of the 605 C Street Unreinforced
Masonry project, Development Services staff first determined that the
applicant had submitted all of the required information, materials, fees,
and deposits for a building permit. They then performed structural,
historical resources, and neighborhood code compliance reviews for this
project. Among other things, the structural engineering reviewer asked
the applicant to specify the occupancy group and type of construction
of the existing building, to clarify whether the walls were brick or
cement, and to conduct mortar strength tests. After the applicant
addressed the reviewers’ issues and the reviewers signed off in its Project
Tracking System (PTS), Development Services issued the permit. In
another instance, Development Services staff performed engineering,
environmental, fire, geology, landscape, planning, transportation
development, wastewater, and water reviews for the Sea Breeze Carmel
View project’s site development permit. Because the project was subject
to permit review Process Four, after its reviewers signed off on the
project in Development Services’ PTS, the project manager prepared a
report to the planning commission recommending the approval of the
permit. The planning commission considered this report at the public
hearing held on February 25, 2010, and approved the permit.
Development Services generally Development Services also generally complied with certain public
complied with certain public notice requirements found in the municipal code. For the development
notice requirements found in the permits shown in Table 1 of the Introduction on page 10, San Diego’s
municipal code. permit review process includes multiple public notices. For example,
the municipal code requires Development Services to mail the Notice
of Application (application notice) to entitled persons and groups such
as all tenants located on the subject property no later than 10 business
days after its determination that the applicant submitted all necessary
information, materials, fees, and deposits for the permit. In addition,
the municipal code requires Development Services to issue a Notice
of Public Hearing (public hearing notice) before a decision is made
on an application for a permit in accordance with permit review
processes Three, Four, or Five. This notice must be published in a
local newspaper and mailed to the same individuals and groups that
receive the application notice at least 10 business days before the date
of the public hearing. Finally, if there is an appeal of a permit decided
under processes Two, Three, or Four, the municipal code requires
Development Services to publish and mail a public hearing notice at
least 10 business days before the appeal hearing date.
California State Auditor Report 2012-109 21
April 2013
Development Services posted application notices one to two days after
the deadline in the municipal code for four of the nine development
projects related to the conditional use and site development permits
we reviewed. We asked Development Services project managers
why the application notices were late for these projects, but they
were unable to explain the cause of the delays. However, as shown in
Appendix B, Development Services takes an average of 285 days and
394 days, respectively, to issue conditional use and site development
permits. Therefore, we do not believe the one‑ or two‑day delay for
these four projects significantly hindered the public’s awareness of the
applications for the development permits.
Development Services generally issued the public hearing notices
for the nine development projects we reviewed in a timely manner.
Specifically, Development Services published public hearing notices
in the San Diego Daily Transcript, which San Diego identifies as a
newspaper of general daily circulation, 10 business days before the
hearing dates to decide on the applications for all nine projects.
However, Development Services was one day late in mailing the
public hearing notice for the Vision Celular Internacional project.
Finally, we found no evidence of the public appealing the permits
for these nine projects. We concluded that Development Services
provided the public with adequate notice of the projects’ permit
applications and the related public hearings.
Development Services Has Not Used Adequate Methods to Determine
Whether Projects Need Historical Resource Reviews, but
the Reviews It Did Perform Were Sufficient
The Historical Resources Board’s Composition
Development Services relies on applicants who are and a Few of Its Duties
seeking permits to provide information it needs
• The Historical Resources Board (board) for the City of
to determine whether it should review a project
San Diego consists of 11 members whom the mayor
for potential historical resources. However, the
appoints and the San Diego City Council confirms. In
applicants did not always include on their general
addition, the disciplines of architecture, history, architectural
applications the year of construction for the
history, archaeology, and landscape architecture must each
structures on the project sites; this information
have one representative among the board’s members.
would help Development Services determine
• The board adopts specific guidelines for designating
whether or not a historical resource exists. San Diego
historical resources.
has specific regulations to protect, preserve, and
restore its historical resources. The intent of these • The board identifies and designates historical resources
regulations is to assure that development occurs in a for preservation.
manner that protects the overall quality of historical
• The board reviews and makes recommendations
resources such as historical buildings, structures,
to the appropriate decision makers on applications
objects, districts, and landscapes. Through its for development permits involving designated
Historical Resources Board (board), San Diego historical resources.
designates historical resources. The text box
Source: City of San Diego Municipal Code, Section 111.0206.
provides a description of the board’s composition
and a few of its duties.
22 California State Auditor Report 2012-109
April 2013
The municipal code requires the property owner or applicant
to submit the required documentation and to obtain a
construction, neighborhood development, or site development
permit before any development activity occurs on premises
that contain historical resources. If the premises do not have
board‑designated historical resources, for development proposed
for certain parcels containing a structure that is 45 or more years
old, the municipal code requires the city manager to determine the
need for a site‑specific survey within 10 business days of the filing
of an application for a construction permit or within 30 calendar
days for an application for a development permit.4 Based on the
site‑specific survey and the best information available, the city
manager must determine whether a historical resource exists,
whether a potential historical resource is eligible for designation by
the board, and the precise location of the resource.
Development Services did not ensure that the property owners’
or applicants’ general applications contained accurate and
complete information for it to assess whether potential historical
resources exist on their respective project sites. San Diego’s Land
Development Manual requires the property owner or applicant to
submit a general application for construction and development
permits. The general application includes information such as
the location and description of the project. The property owner
or applicant must also provide the following historical resources
information: a board‑designated site number or historical district
or the construction year for the structures on the project site. The
property owner or applicant must certify that the information
For five of the 19 projects we provided is correct and accurate to the best of his or her knowledge
reviewed, the property owners and that he or she understands the project will be reviewed based
or applicants did not include on on this historical resources information. However, for five of the
their general applications the 19 projects we reviewed, the property owners or applicants did not
construction year for the structures include on their general applications the construction year for the
on the project site. structures on the project site.
Because of this omission of the construction year, Development
Services staff could not determine whether they should send these
projects to the advanced planning and engineering division for
review. Historical resources staff within Development Services’
advanced planning and engineering division review permit
applications with projects that affect board‑designated historical
resources and potential historical resources on parcels containing
a structure that is 45 or more years old for consistency with
the U.S. Secretary of the Interior’s Standards for Rehabilitation
(Interior’s standards), which we describe in the Introduction on
page 12. Of the five projects for which the applicant did not report
4 Although the municipal code refers to the city manager, a 2004 amendment to San Diego’s
charter transferred the city manager’s powers to the mayor.
California State Auditor Report 2012-109 23
April 2013
the year of construction, the project managers forwarded just
two to the historical resources staff. One of the two project managers
stated that an environmental review staff member in the advanced
planning and engineering division brought the age of the structure on
the property to his attention during her initial environmental review.
The other project manager stated that an environmental review
staff member identified the structure’s date of construction while
reviewing the project plans and requested that she send the project
to the historical resources staff for review. According to Development
Services’ PTS, the project managers for the remaining three projects
did not send them to the historical resources staff for review. As
a result, Development Services cannot guarantee that its project
managers appropriately identified those project sites requiring
further scrutiny to determine whether historical resources existed,
whether potential historical resources were eligible for designation by
the board, and the precise location of the resources.
We attempted to obtain the necessary records from the assessor/
recorder/county clerk for the County of San Diego (county) to
establish the age of the structures on these five project sites, as
well as for a project site for which Development Services could
not locate the general application.5 However, the county did not
have records for one of the six project sites. According to a
property assessment specialist, the county may lack building
records for several reasons, including that it did not receive
notification that there is a structure on the land or did not receive
information on the permit or the approved building plans from
the city or county. For San Diego, according to one of its program
managers, Development Services submits permit issuance
information to the county to update the properties’ market
values. For three of the remaining five project sites, the county’s
records indicate that the structures were less than 45 years old.
Therefore, the project managers did not need to send these projects
to the advanced planning and engineering division for historical
resource reviews. However, for the last two projects, the county’s
records indicate that the structures on the sites were more than Development Services
45 years old. Fortunately, as previously mentioned, Development environmental review staff were
Services environmental review staff were able to identify the able to identify the need for its
need for its historical resources staff to perform reviews for historical resources staff to perform
these projects. reviews for two of the projects.
We also reviewed the county’s records for the other 13 projects we
selected for review and found that the property owners’ or
applicants’ general applications for 10 projects contained
information on the structures that conflicted with the county’s
5 One of the county’s primary responsibilities is to locate, identify, and appraise for property tax
purposes all vacant land; improved real estate; business property; and certain mobile homes,
boats, and aircraft.
24 California State Auditor Report 2012-109
April 2013
records. For example, the property owner’s general application for
the Restaurant Depot project indicated that the structure was built
in 1970, but the county’s records indicate that the structures on the
project site were built as early as 1945. Despite the property owner’s
inaccurate general application, according to the project manager,
an environmental review staff member who was performing the
initial environmental review brought to her attention the need for a
historical resource review for this project. The historical resources
staff completed a review for the project in April 2010.
Moreover, the county did not have information for one of the
remaining three projects, but the applicants’ information for
the other two projects agreed with the county’s records.
Nevertheless, the inconsistencies between the property owners’
or applicants’ information and the county’s information for the
10 projects call into question Development Services’ reliance on
the general applications to determine whether the project site
warrants a historical resource review. Until it either requires the
property owners and applicants to provide documentation, such
as the county’s records when they are available, to support the
statements they make in their general applications for all projects
or obtains the information directly from the county, Development
Services will continue to risk not identifying project sites with
potential historical resources.
Although Development Services’ Although Development Services’ process for identifying project
process for identifying project sites sites with potential historical resources needs improvement, the
with potential historical resources historical resource reviews its staff did perform appear to comply
needs improvement, the historical with the processes outlined in the municipal code and San Diego’s
resource reviews its staff did Land Development Manual. During our review of the property
perform appear to comply with owners’ and applicants’ general applications and the county’s
processes outlined in the municipal records, we found that eight of the 19 projects affected structures
code and San Diego’s Land that were 45 or more years old and that the board had not already
Development Manual. designated as historical resources. Two of the eight projects did
not require historical resource reviews. One of these two projects
did not require a review because alterations were made only
to the interior of the structure. The municipal code states that
Development Services is not required to conduct a historical
resource review for certain construction and development permits
that do not include a change to the exterior of existing structures.
The other project did not require a review because an initial study
submitted in 2009 in accordance with the California Environmental
Quality Act (CEQA) stated that a records search and survey
conducted in October 2007 did not identify any previously
recorded archaeological or historical resources within the project
site. The initial study stated that an updated records search
identified a recently recorded archeological site near the project
site, and it indicated that the applicant—to address the potential
impacts to unknown buried resources—was required to participate
California State Auditor Report 2012-109 25
April 2013
in the mitigation, monitoring, and reporting program. However, no
additional evaluation of the project site was necessary. San Diego’s
Land Development Manual states that a historical resource review
is not required if the site has been evaluated in accordance with
CEQA within the last five years and there has been no change
in the conditions that contributed to the determination of
historical significance.
The advanced planning and engineering division’s historical The advanced planning and
resources staff performed reviews for the remaining six projects, engineering division’s historical
two of which were for the Sherman Heights and Farmers Market resources staff performed reviews
projects that are at the center of the controversy discussed in the for the remaining six projects,
Introduction on pages 13 through 16. The historical resources staff two of which were for the Sherman
found that the Farmers Market project site was potentially historic, Heights and Farmers Market
but that the property owner’s proposed changes did not include projects that are at the center
any alterations to the exterior facades of the building and that the of the controversy discussed in
conditional use permit was consistent with Interior’s standards. For the Introduction.
the Sherman Heights project, the historical resources staff initially
found that the applicant’s proposed changes did not comply with
Interior’s standards. However, after the applicant made the revisions
that the staff requested, the historical resources staff concluded that
the project was consistent with Interior’s standards.
In addition, the advanced planning and engineering division
determined that the sites for three of the six projects were
not eligible for designation as historical resources under the
board‑adopted guidelines. The division based its conclusions
on the board‑adopted historical resources guidelines contained
in the Land Development Manual, which state that evaluations of
historical resources should include the structure’s age; location;
context, such as topography and excavation profile; and association
with an important person or event, uniqueness, and integrity.
For the last of the six projects, the advanced planning and
engineering division determined that a mural on the site was a
potential historical resource and directed the property owner to
hire a consultant to prepare a historical resources technical report
(technical report). This technical report includes a discussion and
analysis of the site’s characteristics in comparison to the relevant
designation criteria.
The consultant concluded that the mural was a significant historical
resource that was eligible for designation, and the advanced planning
and engineering division agreed with that finding. The consultant
also recommended that, to mitigate the impacts of the proposed
project, high‑quality color photographs should be taken of the entire
mural before the partial demolition of the building, and the property
owner should consult with the mural artist to reestablish the mural’s
thematic continuity after the demolition. According to a senior
planner, the advanced planning and engineering division worked
26 California State Auditor Report 2012-109
April 2013
with the property owner to redesign the project to retain, protect,
and restore the mural. The advanced planning and engineering
division determined that, with the mitigating activities specified in
the technical report, the project’s impacts to the mural were less
than significant, and according to a senior planner, the project was
consistent with Interior’s standards. The advanced planning and
engineering division’s guidance to the property owner is consistent
with the Land Development Manual’s instructions regarding
mitigating impacts, which state that all prudent and feasible
measures to minimize harm to the resource shall be taken.
Finally, two of the 19 projects contained sites that were already
board‑designated historical resources. The municipal code requires
Development Services to review development affecting designated
Based on our testing, San Diego’s historical resources for consistency with Interior’s standards. The
review process—when followed— historical resources staff found that the applicants’ proposed changes
appears adequate to protect were consistent with Interior’s standards. Overall, based on our testing,
board‑designated and potential San Diego’s review process—when followed—appears adequate to
historical resources. protect board‑designated and potential historical resources.
Development Services Inappropriately Processed Construction
Changes to Building Permits
In addition to the 20 building and development permits discussed
previously, our review included the 10 construction changes to
building permits that we present in Appendix A. We found that
Development Services did not consistently adhere to the municipal
code when it approved construction changes to building permits.
The municipal code states that no structure shall be erected,
constructed, enlarged, altered, repaired, improved, converted,
permanently relocated, or partially demolished unless a separate
building permit for each structure is obtained from the building
official. The municipal code defines structure as “an edifice or
building of any kind or construction built up or composed of parts
joined together in some definite manner including a wall, fence,
pier, post, sign, or shelter.” However, the municipal code states
that multiple permits are not required when the dwelling and
associated accessory structures are located on the same property
and described in the building permit application, plot plan, and
other drawings and exempts certain structures and activities from
the requirement to obtain a building permit. The municipal code
defines accessory structure as “a structure attached to or detached
from a primary structure located on the same premises that is
customarily incidental and subordinate to the primary structure
or use.” Further, Development Services’ development review
procedures state that a construction change is not the appropriate
process under certain conditions, such as if the change includes
new structures.
California State Auditor Report 2012-109 27
April 2013
Development Services did not require building permits for
two projects involving the addition of new structures. The
construction change for one project involved adding a chain‑link
fence at the rear of the building. The municipal code does not require
a building permit when adding fences that are 6 feet in height or
less. However, according to the building plans, the proposed height
of the fence was 6 feet 9 inches and therefore required a building
permit. The construction change for the other project entailed adding
a retaining wall—a wall designed to resist the lateral displacement
of soil or other materials—at the site. The municipal code does not
require a building permit when adding retaining walls that are 3 feet
in height or less. Yet, according to the building plans, the proposed
height of the retaining wall was 3 feet 4 inches, thus requiring a
building permit.
For both projects, the assistant deputy director for Development
Services’ advanced planning and engineering division stated that
new building permits for the changes to the scope were not required
because the changes were approved through Development Services’
construction change process. The assistant deputy director also
referred us to Development Services’ Information Bulletin 118, issued
in June 2011, which describes the process for construction changes
to approved plans. Development Services’ information bulletins
are free publications that provide the public with its fees, technical
instruction, and its policies and procedures. However, the assistant
deputy director did not specifically address our concern that the height
of the structures did not conform to the municipal code requirements. It appears that Development
Further, Development Services’ information bulletins cannot supersede Services did not comply with the
the requirements set forth in the municipal code. Thus, it appears municipal code requirement for
that Development Services did not comply with the municipal code issuing building permits for the
requirement for issuing building permits for the addition of the new addition of new structures at
structures at these two project sites. two project sites.
Although the municipal code allows for the exemptions discussed
previously, these exemptions do not apply to alterations, repairs, or
improvements of certain historical resources. Specifically, for certain
projects in which historical resources are present on the site, the
municipal code requires construction permits instead of a neighborhood
development permit or a site development permit. For the 10 projects
we reviewed that had construction changes to building permits, seven
of the property owners or applicants, including the project involving the
addition of a fence, indicated on their general applications for the building
permits that board‑designated historical resources or structures that
were 45 or more years old did not exist on the project sites. In addition,
Development Services was unable to locate the general application for
the building permit for the project involving the addition of a retaining
wall. Therefore, for this project, Development Services was unable to
demonstrate board‑designated historical resources or structures that
were 45 or more years old were not present on the project site.
28 California State Auditor Report 2012-109
April 2013
The applicant for one of the two remaining construction changes
did indicate on the general application for the building permit
that the property was in a board‑designated historical district. The
construction change was for electrical and mechanical revisions
Although the municipal code to the interior of a restaurant and nightclub. The municipal code
requires construction permits for requires construction permits for any historical building or structure
any historical building or structure located within a historical district. Yet, Development Services did
located within a historical district, not issue a construction permit and did not perform a historical
Development Services did not issue resource review to ensure that the changes were consistent with
a construction permit for one of Interior’s standards. The assistant deputy director for Development
the projects we reviewed nor did it Services’ advanced planning and engineering division stated that the
perform a historical resource review construction change for this project was minor and did not require a
to ensure that the changes were specific review by the historical resources staff because the building
consistent with Interior’s standards. review staff are authorized to allow minor changes, modifications, or
alterations to approved plans consistent with Development Services’
construction change process described in Information Bulletin 118.
The municipal code defines minor alterations as “improvements
that enhance, restore, maintain, repair, or allow adaptive reuse of a
historical resource that do not adversely affect the special character
or special historical, architectural, archaeological, or cultural value
or designated interior elements of the property of the resource
and will conform to the standards of the designation of a historical
district when applicable.” The municipal code also requires the minor
alterations to be consistent with Interior’s standards and guidelines.
Thus, the assistant deputy director’s statement that the project did
not require a historical resource review is inconsistent with the
municipal code. Further, Development Services’ construction change
process found in its information bulletin cannot supersede the
municipal code requirements.
The other construction change was related to the Sherman
Heights project discussed previously. Development Services
determined that this project site was a potential historical resource
eligible for designation by the board. In reviewing the building
permit for the Sherman Heights project, the historical resources
staff concluded that the project was consistent with Interior’s
standards. In addition, the historical resources staff concluded
that “any and all revisions to the project scope, no matter how
minor, will require review and approval by historical resources staff
prior to those changes being carried out. In addition, any future
projects submitted will require review by Plan‑Historic staff.” The
construction change was for “changes to the footing underpinning
sequences.” Underpinning is the process of modifying an existing
foundation by extending it to or into subsurface strata that is deeper
and more stable than the near surface soil that supports the existing
foundation system. Common methods of underpinning include
the construction of footings. However, Development Services
did not perform a historical resource review to ensure that the
changes were consistent with Interior’s standards. The assistant
California State Auditor Report 2012-109 29
April 2013
deputy director for Development Services’ advanced planning and
engineering division was unable to explain why a historical resource
review was not conducted for this project.
Until Development Services aligns its Information Bulletin 118
with the municipal code requirements, it cannot ensure that it
appropriately issues construction permits, such as building permits,
and conducts historical resource reviews for projects with changes
to the approved plans.
Development Services Did Not Consistently Comply With Certain
Public Notice Requirements
For projects exempt from CEQA, Development Services generally
complied with the applicable public notice requirements. However,
for projects subject to CEQA, Development Services did not
provide the public with proper notice. Specifically, Development
Services did not file Notices of Determination (determination
notices), or it filed the determination notices late. Consequently, the
public’s ability to challenge these environmental determinations in
court may have been hindered. Further, Development Services does
not post a Notice of Right to Appeal Environmental Determination
(appeal notice) for certain projects subject to CEQA as the
municipal code requires. Thus, the public does not receive proper
notice of its right to appeal the environmental determinations for
these projects.
Development Services Generally Complied With Public Notice
Requirements for Projects Exempt From CEQA
Three of the nine development projects related to the conditional
use and site development permits we reviewed were exempt from
CEQA. Specifically, Development Services deemed the Market
Street Church, Vision Celular Internacional, and La Cima Oil
Convenience Store projects exempt from CEQA because they
affected an existing facility and involved negligible or no expansion
of use of the facility. The CEQA guidelines—the state regulations
that implement CEQA—state that, when a public agency such
as San Diego decides that a project is exempt from CEQA and
approves the project, it may file a Notice of Exemption (exemption
notice) after its approval of the project. The exemption notice must
include information such as the project’s description and location
and the public agency’s finding, or determination, that the project is
exempt and the reason or reasons for deeming the project exempt.
30 California State Auditor Report 2012-109
April 2013
The CEQA guidelines also state that the exemption notice, if
prepared, must be filed with the county clerk and posted in the
county clerk’s office for 30 days. The CEQA guidelines do not
specify a time frame after project approval for the public agency
to submit the exemption notice to the county clerk. Development
Services’ development review procedures require it to submit an
exemption notice to the county within five business days after the
date on which all rights have elapsed for appealing the exemption
decision. As discussed later, the city council considers the appeals
for environmental determinations. According to the CEQA
guidelines, a public agency’s filing of an exemption notice with the
county clerk triggers a 35‑day period in which interested parties
can legally challenge in court the agency’s decision that the project
is exempt from CEQA. If the agency does not file an exemption
notice, a 180‑day statute of limitations applies, according to the
CEQA guidelines.
Development Services generally complied with its exemption
notice requirements for the three projects we reviewed. However,
Development Services submitted Development Services submitted the exemption notice for
the exemption notice for the Vision the Vision Celular Internacional project to the county roughly
Celular Internacional project to the three weeks later than its review procedures require. Moreover,
county roughly three weeks later the exemption notice was incomplete because it did not
than its review procedures require provide the reason the project was exempt, as the CEQA guidelines
and it did not provide the reason require when such a notice is filed. Although the posting of the
the project was exempt. exemption notice did not occur within the time frame specified
in Development Services’ review procedures, this delay did not
affect the public’s ability to legally challenge the exemption for this
project, because the period for challenging the decision starts when
the county posts the exemption notice.
The municipal code goes beyond the CEQA requirements and
states that Development Services must post an appeal notice
when a project is deemed exempt from CEQA in accordance
with one of the categorical exemptions specified in the CEQA
guidelines. The appeal notice must be posted at Development
Services in a location easily accessible to the public for a period
of 15 business days. The appeal notice must include the project’s
description and location and statements regarding the type of
environmental determination and the reason for the determination.
Before October 2011 the public had to file an application to
appeal an environmental determination with the city clerk by the
earlier of 10 business days from the date the appeal notice was
posted or 15 business days from the date of the environmental
determination. The city council amended the municipal code in
October 2011 to limit the appeal period to within 10 days from the
date the appeal notice was posted. The city council considers
the environmental determination appeal in a public hearing.
If the council grants the appeal, Development Services must
California State Auditor Report 2012-109 31
April 2013
prepare a revised environmental document that considers any
direction that the city council provides. According to an assistant
deputy director, Development Services does not have any official
documentation demonstrating that it posted the appeal notices for
these three projects in a location easily accessible to the public for a
period of 15 business days. Therefore, we were unable to determine
whether Development Services fulfilled this requirement.
However, we were able to determine that Development Services
prepared appeal notices for these projects that included the
appropriate information.
Development Services Did Not Always Comply With Public Notice
Requirements for Projects Subject to CEQA
For those projects that Development Services determines are subject
to CEQA, the CEQA guidelines and San Diego’s municipal code
require it to post certain public notices. Table 5 on the following page
identifies the six projects we reviewed that were subject to CEQA, as
well as the public notice requirements applicable to those projects.
Development Services either did not file the determination notice or
did not file it in a timely manner for four of these projects. Further,
Development Services incorrectly interprets the municipal code as
not requiring it to post appeal notices for projects following permit
review Process Three. Development Services’ noncompliance with
public notice requirements may limit the public’s ability to challenge
environmental determinations and creates the possibility that some
members of the public may not be aware of their ability to challenge
the decision.
Development Services Did Not Notify the Public Properly About Its
Environmental Determinations
Development Services did not always file the determination notices
on time and, for one of the six projects, it did not file a notice at all.
The CEQA guidelines specify that, within five business days after
deciding to approve a project, an agency must file a determination
notice with the county clerk. In addition, the municipal code
states that Development Services or the city clerk must file the
determination notice within five business days of the date of final
action for each project approval that includes the consideration of
an environmental document and defines final action as the date all
rights of appeal are exhausted for a permit. The CEQA guidelines
prescribe the content of the determination notice. For example,
it must include the project’s description and location, as well as
statements that the determination was made pursuant to CEQA
and whether any mitigation measures were made a condition of the
project’s approval. The CEQA guidelines also state that the
32 California State Auditor Report 2012-109
April 2013
Table 5
Public Notices Required for the Projects Reviewed That Were Subject to the California Environmental Quality Act
PERMIT
PROJECT REVIEW CALIFORNIA ENVIRONMENTAL QUALITY ACT CITY OF SAN DIEGO MUNICIPAL CODE
NUMBER PROJECT TITLE PERMIT TYPE PROCESS PUBLIC NOTICE REQUIREMENT PUBLIC NOTICE REQUIREMENT
Nativity Prep Notice of Intent to Adopt Negative
148350 Conditional use Five None*
Academy Declaration and Notice of Determination
Hampton Inn Notice of Intent to Adopt Negative Notice of Right to Appeal
154312 Site development Three
Mission Valley Declaration and Notice of Determination Environmental Determination
Shiraz Medical Notice of Intent to Adopt Negative Notice of Right to Appeal
157724 Site development Three
Center Declaration and Notice of Determination Environmental Determination
168264 Farmers Market Site development and Three Notice of Determination None†
conditional use
168788 Sea Breeze Site development Four None‡ None*
Carmel View
Notice of Intent to Adopt Negative
180219 Restaurant Depot Site development Four None*
Declaration and Notice of Determination
Sources: The project files and Project Tracking System information belonging to the City of San Diego’s Development Services Department
(Development Services) and the California State Auditor’s review of this information.
* The City of San Diego Municipal Code (municipal code) does not require Development Services to post a Notice of Right to Appeal Environmental
Determination for projects following permit review processes Four and Five.
† For this project, Development Services prepared an addendum to a previously adopted negative declaration. The California Environmental Quality
Act (CEQA) guidelines and the municipal code do not require public notices for addendums. However, if the original environmental document
was adopted or certified more than three years before the date of the application, the municipal code requires Development Services to distribute
the addendum application and the previous environmental document for public review for 14 days. Development Services complied with
this requirement.
‡ For this project, Development Services relied on a previously adopted mitigated negative declaration because it determined that there was no
change in circumstance, additional information, or project changes to warrant an additional environmental review. The CEQA guidelines do not
require public notices and a public review period if the agency determines a subsequent environmental document is not necessary.
county clerk must post the determination notice for at least 30 days.
Further, Development Services’ filing of the determination notice
with the county, according to the CEQA guidelines, triggers a
30‑day period in which interested parties can legally challenge the
approval of the project under CEQA. However, if Development
Services does not file the determination notice or files it late, the
public has 180 days from either the decision to approve the project
or the commencement of the project if the project is undertaken
without a formal decision to file a court action challenging the
approval of the project.
Development Services did not file a determination notice
for the Farmers Market project. Its project manager stated
that Development Services’ failure to file this notice was an
administrative error. Specifically, according to the project manager,
an environmental analyst prepares the determination notice and
gives it to the project manager, who in turn gives it to a word
processing clerk to file with the county. The project manager
stated that it was during one of these steps that the filing of the
determination notice was overlooked.
California State Auditor Report 2012-109 33
April 2013
Development Services filed the determination notices for three
projects between 12 business days and more than 90 business days
late. The county charges a $50 documentary handling fee that agencies
must include with each document they submit for filing and posting.
Each of the project managers for the Hampton Inn Mission Valley,
Restaurant Depot, and Shiraz Medical Center projects believes
that the delays occurred because the applicants did not submit
in a timely manner the filing fees for the determination notices.
According to the assistant deputy director for project management,
Development Services requires applicants to submit a check made
payable to the county to cover the filing fees for the determination
notice. The county will return notices to agencies if the agency does
not provide these fees. Development Services does not believe that
it can collect the fees in advance of filing the determination notice to
avoid the delays. Specifically, the assistant deputy director for project
management stated that the city charter and municipal code require
Development Services to immediately process checks. The city charter
and municipal code require every department that receives money
from the public to deposit the money daily with the city treasurer. The
assistant deputy director for project management further stated that
the city treasurer has admonished Development Services for holding
checks for more than 24 hours. However, the CEQA guidelines do not
provide exemptions to the filing requirements for the determination
notice. Until Development Services establishes procedures to prevent Until Development Services
delays in receiving the applicants’ filing fees and submitting the establishes procedures to prevent
fees to the county, it will continue to fail to provide timely notice delays in receiving the applicants’
of the public’s right to challenge these determinations in court. For filing fees and submitting the fees
the Shiraz Medical Center project, Development Services’ delay of to the county, it will continue to
more than 90 days in filing the determination notice with the county fail to provide timely notice of the
absorbed more than half of the 180‑day period the public had to bring public’s right to challenge these
a legal challenge. determinations in court.
Development Services Has Not Notified the Public About Citizens’ Right
to Appeal Certain Environmental Determinations for Particular Types
of Projects
As previously mentioned, the municipal code requires Development
Services to post an appeal notice when it deems a project exempt
from CEQA. The municipal code also requires Development
Services to post an appeal notice when an environmental
determination has been made under San Diego’s permit review
processes Two and Three, in which city staff and a hearing officer,
respectively, decide whether to approve the permits. However,
Development Services does not post appeal notices for projects
subject to permit review Process Three because of its interpretation
of the municipal code. The assistant deputy director for project
management estimated that 135 projects are approved annually using
permit review Process Three.
34 California State Auditor Report 2012-109
April 2013
As shown in Table 5 on page 32, three of the six projects that were
subject to CEQA were approved using permit review Process Three,
in which a hearing officer is the decision maker. However, only the
Hampton Inn Mission Valley and Shiraz Medical Center projects
required appeal notices. Our selection of projects did not include
any projects that were approved using permit review Process
Two, in which city staff are the decision makers. In January 2013
Development Services submitted a memo to the city council
president and the council’s rules and economic development
committee. In the memo, Development Services’ assistant deputy
director for advanced planning and engineering stated that
environmental documents prepared for projects subject to permit
review processes Three, Four, and Five are not environmental
determinations that the city manager approves; therefore, these
projects are not subject to the appeal notice requirement. Further,
the assistant deputy director stated that, for permit review
processes Three and Four, the public receives verbal notice from the
hearing officer or planning commission at the time of the hearing of
its right to appeal.
We disagree with the assistant deputy director’s statement that
environmental documents prepared for projects subject to permit
review Process Three are not environmental determinations that
the city manager approves. The hearing officers are the decision
makers for permit review Process Three. The municipal code
states that the city manager may designate a staff member to
serve as a hearing officer. In addition, the municipal code states
that the city manager will determine whom to appoint and the
length of time the person will serve as a decision maker. The
municipal code affords the city manager the same level of authority
when designating city staff to be decision makers for permit
review processes One and Two. Thus, environmental documents
prepared for projects subject to permit review Process Three are
environmental determinations the city manager approves, and
they should be subject to the appeal notice. Moreover, our review
Our review of the hearing minutes of the hearing minutes for the Hampton Inn Mission Valley and
for the Hampton Inn Mission Shiraz Medical Center projects found no evidence that the public
Valley and Shiraz Medical Center received verbal notice of the appeal requirements from the hearing
projects found no evidence that the officer. According to the assistant deputy director, Development
public received verbal notice of Services intends to clarify the municipal code requirement for the
the appeal requirements from the appeal notice within the first half of 2013. Specifically, she stated
hearing officer. that Development Services intends to seek an amendment to
the municipal code that will state specifically that environmental
determinations made by the hearing officer are not subject to the
appeal notice requirement. Nevertheless, until an amendment
is approved, Development Services is not complying with the
municipal code as currently written, and as a result, the public is
not receiving proper notice of its ability to appeal environmental
determinations under permit review Process Three.
California State Auditor Report 2012-109 35
April 2013
Development Services Has Not Ensured That Its
Designated Employees Assuming or Leaving Office The Political Reform Act of 1974
Disclose Their Economic Interests in a Timely Manner Key Requirements for Conflict‑of‑Interest Codes
A conflict‑of‑interest code must identify the following:
Certain Development Services employees must
disclose their financial interests in accordance • Designated positions within the agency that
involve the making or participation in the making
with the Political Reform Act of 1974 (Political
of decisions that may foreseeably have a material
Reform Act), but Development Services did not
effect on any financial interest and for each position
ensure that these employees do so in a timely
the specific types of investments, business positions,
manner. The Political Reform Act requires local
interests in real property, and sources of income that
government agencies, such as San Diego, to adopt
are reportable.
a conflict‑of‑interest code that applies to staff
• Requirements that each designated employee
members or officers known as designated employees.
file annual statements disclosing reportable
The text box presents the Political Reform Act’s key
investments, business positions, interests in real
requirements for a conflict‑of‑interest code.
property, and income at the time specified in the
conflict‑of‑interest code and within 30 days of
Development Services’ conflict‑of‑interest code
assuming and leaving office.
identifies its designated positions and includes
• Circumstances under which designated employees
positions such as engineers, hearing officers,
or categories of designated employees must
building inspectors, senior planners, and project
disqualify themselves from making, participating
managers. Designated employees must submit
in the making, or using their official positions to
their Statement of Economic Interests, commonly
influence the making of any decisions.
known as Form 700, to San Diego’s filing officer.
State regulations specify that the filing officer is Source: California Government Code, Title 9, Chapter 7, Article 3.
the person or agency responsible for receiving and
retaining the original Form 700s. The municipal
code designates the city clerk as San Diego’s filing
officer. According to the training materials of the Office of the
City Clerk (city clerk), the city clerk relies on filing liaisons in
each city department to maintain an accurate list of designated
employees and to notify the city clerk when designated employees
assume or leave their offices. An analyst at the city clerk stated
that when the filing liaison notifies the city clerk that a designated
employee has assumed or left office, staff check to see whether the
designated employee has filed the appropriate statement. If
the designated employee has not done so, staff send the employee
a letter notifying him or her of the filing requirement. In addition,
each year in advance of the April 1 filing deadline for the annual
Form 700s, the procedures used by the city clerk require it to send
the filing liaisons a current list of their designated employees and
ask them to update their respective lists.
However, Development Services’ filing liaisons did not always
notify the city clerk of changes to its list of designated employees.
Consequently, Development Services employees did not always
submit their Form 700s in a timely manner. Specifically, the Form 700s
submitted for 2009, 2010, and 2011 by four of the 15 designated
employees we selected for review were between one month and more
than 12 months late.
36 California State Auditor Report 2012-109
April 2013
Moreover, two designated employees failed to submit a Form 700
within 30 days of assuming office in October 2008. Instead, both
employees filed the form in 2010. Under the Type of Statement
category on the forms, they checked “assuming office” and stated
that the date they assumed office was October 28, 2008. These
employees also checked “annual” and stated that the period
covered was October 29, 2008, through December 31, 2009. State
regulations allow individuals who assume office between October 1
and December 31 and who file their Form 700 within 30 days of
Two designated employees were assuming office to not file their next Form 700 until one year later.
roughly 18 months late in filing For example, if these two employees had filed their Form 700 by
their Form 700 after assuming their November 27, 2008, their annual Form 700 for 2009 would be due
offices; thus, they did not disclose by April 1, 2010. However, these employees were roughly 18 months
their financial interests held late in filing their Form 700 after assuming their offices; thus, they
during 2008. did not disclose their financial interests held during 2008.
One of Development Services’ associate management analysts
stated that the filing liaison from that period of time is no longer an
employee of Development Services. In addition, one of the current
filing liaisons stated that she could find no record of why these
two employees filed their Form 700s late. Development Services’
filing liaisons also did not notify the city clerk when one of these
two employees left her office on August 7, 2010. According to an
analyst, the city clerk did not become aware of the employee’s
departure until February 2011, after it requested Development
Services to update its list of designated employees. The employee
has since filed her Form 700 with the city clerk, doing so on
June 14, 2011.
In addition, a designated employee failed to submit a Form 700
within 30 days of assuming office on October 1, 2011. According
to e‑mail correspondence between the city clerk and
Development Services, the filing liaison was not aware of the
employee’s promotion into a designated position until a year
later, in October 2012. This employee filed her Form 700 on
October 17, 2012. Finally, a designated employee failed to submit
a Form 700 within 30 days of leaving office on October 2, 2009.
The filing liaison stated that she was unable to recall whether she
was notified about the employee’s departure, because in 2009
Development Services administration personnel were encountering
a heavy workload resulting from a reduction in workforce and a
large number of employee transfers, demotions, promotions, and
terminations. Nevertheless, the city clerk was not made aware of
the employee’s departure until she ultimately filed her Form 700 on
November 27, 2009.
California State Auditor Report 2012-109 37
April 2013
In these cases, Development Services’ filing liaisons consistently Development Services’ filing
failed to notify the city clerk of designated employees leaving or liaisons consistently failed
assuming office. One of the filing liaisons stated that they rely on to notify the city clerk of
Development Services payroll staff to provide notification of when designated employees leaving
designated employees assume or leave office and that the filing or assuming office.
liaisons and the payroll staff are currently developing procedures
to effectively communicate this information. Until such procedures
are in place, the city clerk cannot ensure that it collects Form 700s
from designated employees when they assume and leave office in a
timely manner.
San Diego’s Ethics Commission Did Not Comply With the City Council’s
Policy on Administering Ethics Training for Certain Employees
The City of San Diego Ethics Commission (commission) has not
ensured that employees who must attend ethics training do so by
the city council’s deadlines. In June 2001 the city council created the
commission, which has jurisdiction over San Diego’s elected and
appointed officials and its unclassified employees who are required
to file a Form 700. San Diego’s city charter identifies its unclassified
positions as including positions such as department heads, the city
clerk, the planning director, and managers who have significant
responsibilities for formulating or administering departmental
policies and programs.
Among other responsibilities, San Diego’s municipal code states that
the commission is responsible for providing training and education
on governmental ethics laws, such as local laws that govern conflicts
of interest and financial disclosure. The city council adopted
in 1967 a code of ethics and ethics training policy, which it last
amended in 2002. This policy requires city officials and unclassified
employees to attend ethics training within 60 days of assuming
office and biennially thereafter.6 The policy also specifically requires
unclassified employees who file a Form 700 upon assuming office
in even‑numbered years to complete ethics training no later than
March 31 of each even‑numbered year thereafter. Similarly, those
unclassified employees who file a Form 700 upon assuming office
in odd‑numbered years must complete their ethics training no later
than March 31 in odd‑numbered years.
The commission does not administer the ethics training for
San Diego’s unclassified employees in accordance with the city
council’s policy. Our review of 2010 through 2012 ethics training
6 The city council’s policy is consistent with legislation enacted in 2005 that requires each local
agency official to receive at least two hours of training in general ethics principles and ethics laws
relevant to his or her public service. This training should occur no later than one year from the
official’s first day of service with the local agency and at least once every two years thereafter.
38 California State Auditor Report 2012-109
April 2013
The commission does not records for seven of Development Services’ 12 unclassified
administer the ethics training for employees found that six of these employees attended training
San Diego’s unclassified employees between four and 18 months after their March 31 deadlines. For
in accordance with the city council’s example, one employee should have completed his training by
policy. In fact, one employee should March 31, 2011, but did not do so until January 27, 2012, almost
have completed his training by 10 months after the deadline. In addition, as of December 31, 2012,
March 31, 2011, but did not do so two of the employees who should have completed training by
until January 27, 2012, almost March 31, 2012, had not done so.
10 months after the deadline.
The commission’s program manager stated that the policy’s
ethics training requirements were written before anyone received
the training, and they contain several practical difficulties. For
example, the program manager told us that the policy calls for
training hundreds of unclassified employees before a March 31
deadline, when the commission’s resources are better suited for
training them on a quarterly basis. The program manager also
stated that over time the commission has developed a practical,
reasonable approach by providing training to all unclassified
employees shortly after they become subject to the policy and every
two years thereafter, which it believes maintains the spirit of the
policy. Finally, the program manager stated that the commission
has not sought to change the policy to reflect its current practice
because it has extremely limited resources and it believes amending
the policy is a low priority, especially when its procedures are
accomplishing the goals and spirit of the policy. Nevertheless, until
the commission seeks and obtains changes to the city council’s
policy to align the policy with its current practice, the commission
is violating the policy and is not meeting the city council’s
expectations for enforcement of its ethics training requirement.
Recommendations
To ensure that it properly identifies potential historical resources
for the structures on project sites and conducts reviews in
accordance with the municipal code, Development Services should
require applicants to submit documentation, such as the county’s
property records when available, with their applications or it should
obtain the information directly from the county so that it can
determine whether the project requires a historical resource review.
To comply with the municipal code requirements for construction
permits such as building permits, Development Services should
align Information Bulletin 118, issued in June 2011, which describes
its process for construction changes to approved plans, with the
municipal code requirements for issuing permits and conducting
historical resource reviews.
California State Auditor Report 2012-109 39
April 2013
To provide the public proper notice of San Diego’s decision that a
project is exempt from CEQA, Development Services should do
the following:
• Ensure that the exemption notice includes the information
outlined in the CEQA guidelines.
• Submit exemption notices to the county within five business days
after the date all rights to appeal its decision have elapsed, in
accordance with its procedures.
• Retain documentation demonstrating that it posts the appeal
notices in accordance with the municipal code.
To provide the public proper notice of San Diego’s environmental
determinations within five days of the final approval of a project
in accordance with the CEQA guidelines, Development Services
should develop procedures to ensure that its staff file the
determination notices in a timely manner. For example, to avoid
delays, Development Services should require its staff to collect and
submit to the county the filing fee for each determination notice
within five business days of the final approval of a project.
To provide the public proper notice of San Diego’s environmental
determinations in accordance with its municipal code,
Development Services should seek an amendment to the municipal
code to clarify its belief that environmental determinations made by
a hearing officer are not subject to the appeal notice requirement.
In the interim, Development Services should post appeal notices for
projects subject to permit review Process Three.
To ensure that its designated employees disclose their financial
interests in a timely manner, Development Services should do
the following:
• Ensure that its filing liaisons and payroll staff develop and
implement procedures for notifying the filing liaisons when
designated employees assume or leave their positions.
• Ensure that the filing liaisons promptly notify the city clerk when
designated employees assume or leave their positions.
To ensure that San Diego’s unclassified employees attend ethics
training as required by the city council, the commission should
either follow the city council’s policy or seek a change to align the
policy with its current practice.
40 California State Auditor Report 2012-109
April 2013
We conducted this audit under the authority vested in the California State Auditor by Section 8543
et seq. of the California Government Code and according to generally accepted government auditing
standards. Those standards require that we plan and perform the audit to obtain sufficient, appropriate
evidence to provide a reasonable basis for our findings and conclusions based on our audit objectives
specified in the scope section of the report. We believe that the evidence obtained provides a
reasonable basis for our findings and conclusions based on our audit objectives.
Respectfully submitted,
ELAINE M. HOWLE, CPA
State Auditor
Date: April 25, 2013
Staff: Joanne Quarles, CPA, Audit Principal
A.J. Meyer, MBA
Dana Doughty, MPP
Jessica E. Kubo
Legal Counsel: Donna L. Neville, Chief Counsel
Richard B. Weisberg, JD
IT Audit Support: Michelle J. Baur, CISA, Audit Principal
Ben Ward, CISA, ACDA
Grant Volk, MA, CFE
For questions regarding the contents of this report, please contact
Margarita Fernández, Chief of Public Affairs, at 916.445.0255.
California State Auditor Report 2012-109 41
April 2013
Appendix A
THE CALIFORNIA STATE AUDITOR’S SELECTION OF
CONSTRUCTION AND DEVELOPMENT PERMITS ISSUED BY
THE CITY OF SAN DIEGO
The Joint Legislative Audit Committee (audit committee)
directed the California State Auditor (state auditor) to select
permits of similar scope and size issued or amended since
January 2010, including the permits for the Wal‑Mart Stores, Inc.,
facility that we discuss in the Introduction, to evaluate the City
of San Diego’s (San Diego) compliance with relevant laws and
regulations related to its permit review process. Using the Project
Tracking System (PTS) for San Diego’s Development Services
Department (Development Services), we selected permits for
commercial projects that were issued between January 1, 2010,
and September 17, 2012.7 Because the audit committee specifically
directed the state auditor to determine whether San Diego complied
with relevant laws and regulations regarding applications and plans
that involve historical resources and amendments, we ensured that
our selection of permits included projects for which Development
Services performed historical resource reviews in connection with
the permits and projects with construction changes to plans that
already had approved building permits.
We present the different permit review processes in Figure 2 on
page 11 of the Introduction. Permit review Process One represents
the ministerial permit review process. Construction permits
such as building permits are subject to the ministerial permit
review process. Table A.1 on the following page shows the
10 building permits and Table A.2 on the following page shows
the 10 construction changes to building permits we selected for
review. Permit review processes Two through Five represent
discretionary permit review processes. Development permits such
as conditional use and site development permits are subject to the
discretionary permit review process. Tables A.3 on page 43 and A.4
on page 44 present the five conditional use and five site development
permits that we selected for review. Figure A on page 45 shows
the location of the projects for the permits we selected. Although
we selected 20 permits and 10 construction changes, the building
permit and the change to a building permit for the Sherman Heights
project and the conditional use and site development permits for the
Farmers Market project relate to the same project site. Therefore,
Figure A presents 27 separate project sites.
7 Development Services’ PTS indicates it did not issue the permits for the Farmers Market project
until November 28, 2012. Nevertheless, we selected these permits because they related to the
Wal‑Mart Stores, Inc., facility.
42 California State Auditor Report 2012-109
April 2013
Table A.1
California State Auditor’s Selection of Building Permits That the City of San Diego Issued Between
January 1, 2010, and September 17, 2012
HISTORICAL
PROJECT RESOURCE
NUMBER PROJECT TITLE PROJECT SCOPE REVIEW DATE PERMIT ISSUED
Tenant improvements to remodel existing restaurant space; this work
203737 Cafe Kabob No April 1, 2010
includes new walls, plumbing, electrical, and mechanical.
Amedisys Home Tenant improvements to an existing office; this work includes the demolition
215743 Health Service Tenant and relocation of demising wall used to separate the tenants, demolition of No July 19, 2010
Improvements partition walls, and addition of nonbearing walls.
Timkin Building
231573 Remove unpermitted awning, sign holder, and unpermitted electrical work. Yes April 7, 2011
Code Violation
Tenant improvements to convert its existing retail space to a reflexology
Happy Head Foot
239576 and massage parlor; this work includes new partitions, new suspended No June 2, 2011
Reflexology
ceiling grid, electrical, mechanical, and plumbing.
Illumina Building
Tenant improvements to an existing office; this work includes partitions,
241388 Number 2 Tenant No August 29, 2011
ceiling, electrical, mechanical, plumbing, and a new storage shed.
Improvements
Jones Day Tenant Tenant improvements to suite within an office building; this work includes
242735 No August 9, 2011
Improvements partitions, ceiling, plumbing, electrical, and mechanical.
605 C Street
244870 Partial seismic retrofit to an existing unreinforced masonry building. Yes August 30, 2012
Unreinforced Masonry
255161 Sherman Heights Structural seismic retrofit and tenant improvements.* Yes December 22, 2011
Kaiser Phlebotomy
Tenant improvements to existing lab facility; this work includes partitions,
255536 Lab Tenant No September 13, 2011
ceiling, electrical, mechanical, and plumbing.
Improvements
284802 Costco Generator Install a concrete pad for proposed backup generator. No August 21, 2012
Source: Project Tracking System for the City of San Diego’s Development Services Department.
* The Joint Legislative Audit Committee specifically directed the California State Auditor to review permits related to the Wal‑Mart Stores, Inc., facility.
This permit was issued for the same site as project number 168264 in tables A.3 and A.4.
Table A.2
California State Auditor’s Selection of Changes to Building Permits That the City of San Diego Issued Between
January 1, 2010, and September 17, 2012
PROJECT
NUMBER PROJECT TITLE PROJECT SCOPE DATE PERMIT ISSUED
Construction Change to Approval for Project
Tenant improvements; this work includes partition walls,
216205 Number 205054—6455 Nancy Ridge Drive August 11, 2010
electrical, mechanical, and structural.
Tenant Improvements
Construction Change to Approval for Project Remove wood columns and reuse existing steel columns, resize
217662 Number 206154—Holiday Inn Express, beams to an upper size around the perimeter of the upper August 30, 2010
Porte Cochere structure, and insert two beams to create a step ceiling.
Construction Change to Approval for Project Tenant improvement to provide fence with gates at rear
221635 June 2, 2011
Number 205120—Costco Tenant Improvements of building.
Construction Change to Approval for Project
229963 Number 213260—Café Sevilla Tenant Electrical and mechanical revisions. January 26, 2011
Improvements
California State Auditor Report 2012-109 43
April 2013
PROJECT
NUMBER PROJECT TITLE PROJECT SCOPE DATE PERMIT ISSUED
Among other changes, revise curtain wall height and
Construction Change to Approval for Project orientation, move skylights, revise support and details for harp
237231 April 28, 2011
Number 222477—Flying Fox Exhibit wire screen, add and revise retaining wall, and expand animal
holding area.
Revise structural, electrical, and mechanical to include a 1‑hour
Construction Change to Approval for Project
269284 fire‑rated wall into the construction to serve as future control January 17, 2012
Number 259692—Portola Amenities
zone separation wall for future lab tenants in suites.
Construction Change to Approval for Project
280861 Number 276422—Covario Sixth Floor Changes to light fixtures, circuits, and schedule. May 14, 2012
Tenant Improvements
Construction Change to Approval for Project
283273 Changes to footing underpinning sequences.* May 24, 2012
Number 255161—Sherman Heights
Construction Change to Approval for Project Change the type of construction and eliminate the need to
289829 August 6, 2012
Number 270767—Illumina Building Number Five apply fire‑proofing at third level.
Construction Change to Approval for Project Modifications to finishes, removal of sliding door and supports,
291519 Number 284787—Eastgate Tech Fitness Center removal of light fixture, addition of lighting, and modifications August 15, 2012
and Conference Room to ceiling.
Source: Project Tracking System for the City of San Diego’s Development Services Department.
* The Joint Legislative Audit Committee specifically directed the California State Auditor to review permits related to the Wal‑Mart Stores, Inc., facility.
Table A.3
California State Auditor’s Selection of Conditional Use Permits That the City of San Diego Issued Between
January 1, 2010, and September 17, 2012
HISTORICAL
PROJECT PERMIT REVIEW RESOURCE
NUMBER PROJECT TITLE PROJECT SCOPE PROCESS REVIEW DATE PERMIT ISSUED
109031 Market Street Church Convert two existing buildings into a religious facility. Three Yes April 18, 2012
Demolish existing structures and construct a new school with
Nativity
148350 associated parking, hardscape, and landscape throughout Five Yes December 13, 2010
Prep Academy
the site.
Vision Celular Establish a religious facility within an existing light
157800 Three No January 22, 2010
Internacional industrial building.
Amend existing permit to continue operation of a large
168264* Farmers Market retail facility.† Three Yes November 28, 2012
La Cima Oil Amend existing conditional use permit to allow beer and wine
176464 Three No July 7, 2010
Convenience Store sales within an existing service station convenience store.
Sources: Project Tracking System for the City of San Diego’s Development Services Department (Development Services) and the resolutions approving
the projects.
* A single project can include the approval of multiple permits. As Table A.4 on the following page indicates, we also reviewed the site development
permit issued for this project. In addition, page 14 of the report’s Introduction provides Development Services’ explanation for issuing the permit for
this project after September 17, 2012.
† The Joint Legislative Audit Committee specifically directed the California State Auditor to review permits related to the Wal‑Mart Stores, Inc., facility.
44 California State Auditor Report 2012-109
April 2013
Table A.4
California State Auditor’s Selection of Site Development Permits That the City of San Diego Issued Between
January 1, 2010, and September 17, 2012
HISTORICAL
PROJECT PERMIT REVIEW RESOURCE
NUMBER PROJECT TITLE PROJECT SCOPE PROCESS REVIEW DATE PERMIT ISSUED
Hampton Inn Construct a five‑story hotel with an attached structured
154312 Three No August 30, 2012
Mission Valley parking garage.
Demolish existing buildings and construct a four‑story
Shiraz
157724 medical office building with five levels of a subterranean Three Yes May 19, 2010
Medical Center
parking garage.
Amend existing permit to continue operation of a large
168264* Farmers Market retail facility.† Three Yes November 28, 2012
Sea Breeze Construct two office buildings and a four‑level subterranean
168788 Four No October 22, 2010
Carmel View parking structure.
Demolish existing buildings and construct large
180219 Restaurant Depot Four Yes September 9, 2010
warehouse building.
Sources: Project Tracking System for the City of San Diego’s Development Services Department (Development Services) and the resolutions approving
the projects.
* A single project can include the approval of multiple permits. As Table A.3 on page 43 indicates, we also reviewed the conditional use permit issued
for this project. In addition, page 14 of the report’s Introduction provides Development Services’ explanation for issuing the permit for this project
after September 17, 2012.
† The Joint Legislative Audit Committee specifically directed the California State Auditor to review permits related to the Wal‑Mart Stores, Inc., facility.
California State Auditor Report 2012-109 45
April 2013
Figure A
Project Locations for Construction and Development Permits Selected by the California State Auditor
78
PERMIT TYPES
223377223311 Building permits (Table A.1)
Changes to building permits (Table A.2)
Conditional use permits (Table A.3)
5 Site development permits (Table A.4)
2121 Imperial Avenue*
City of San Diego boundaries
116688778888 56
224422773355
78
15
805
228800886611 226699228844
229911551199 221166220055
228899882299
224411338888 52
220033773377
221155774433
228844880022 222211663355 125
274
163
115577772244 8
115544331122
221177666622
224444887700 223399557766 94
223311557733
116688226644//225555116611//228833227733
54
222299996633 114488335500 110099003311
118800221199
75
805
5
117766446644
115577880000 225555553366
905
Sources: Compilation by the California State Auditor (state auditor) of data provided from the Web site of San Diego Geographic Information Source
(SANGIS), a joint powers authority of the City and County of San Diego responsible for maintaining a regional geographic information system land base
and data warehouse. The state auditor did not assess the reliability of SANGIS’ data.
* The permits for 2121 Imperial Avenue are shown at Table A.1 (project number 255161), Table A.2 (project number 283273), and tables A.3 and A.4
(project number 168264). The Joint Legislative Audit Committee specifically directed the state auditor to review permits related to the Wal‑Mart
Stores, Inc., facility.
46 California State Auditor Report 2012-109
April 2013
Blank page inserted for reproduction purposes only.
California State Auditor Report 2012-109 47
April 2013
Appendix B
THE CITY OF SAN DIEGO’S AVERAGE LENGTHS OF TIME
FOR ISSUING BUILDING, SITE DEVELOPMENT, AND
CONDITIONAL USE PERMITS BETWEEN JANUARY 1, 2010,
AND SEPTEMBER 17, 2012
The Joint Legislative Audit Committee (audit committee) directed
the California State Auditor (state auditor) to select permit
applications and plans for development projects of similar scope
and size that were submitted to the City of San Diego (San Diego)
for approval since January 2010.8 The audit committee also directed
the state auditor to determine the length of time from submission
of the application to permit issuance for these permit applications
and plans and to identify any unusual trends related to the size,
type, and location (specifically, underserved versus more affluent
areas) of the development projects.
To accomplish these tasks, we used data from the Project Tracking
System (PTS) from San Diego’s Development Services Department
(Development Services) to perform an analysis of the building,
conditional use, and site development permit applications and
plans submitted to Development Services and the permits it issued
between January 1, 2010, and September 17, 2012.9 For this period,
8,851 permits met these criteria. As discussed in Table 4 on page 18
in the Introduction, before performing our analysis of the data, we
removed 790 permits that were submitted prior to our audit period.
We also removed 1,469 permits that were missing key data elements
or contained illogical values, causing us to conclude that the PTS
data are not sufficiently reliable for the purpose of our analysis.
Nevertheless, we used the PTS data because no other source of
information was available.
We tried to use the PTS data to identify the permits associated
with individual development projects in order to compare permit
issuance times for development projects. However, we found
that PTS does not track this information in a manner that would
allow us to systematically identify all permits associated with an
individual development project. Specifically, PTS can identify all
permits associated with a location, but a specific location may have
multiple development projects associated with it. To determine
which permits were associated with a given development project
would require manual review of each permit or location.
8 For the purposes of this appendix, we use the term development project to refer both to the
development and to the construction of a particular business or residence at a specific location
and to all related permits.
9 Please refer to page 10 of the Introduction for a description of these permits.
48 California State Auditor Report 2012-109
April 2013
We also attempted to segregate the permits into more discrete
groupings, but we were unable to do so because of data limitations.
Specifically, we attempted to group the permits as either
commercial or residential. However, we found that Development
Services’ PTS does not contain a data field that consistently
identifies this information, and PTS users are not required to
capture it. Further, we tried to group the permits based on square
footage. However, such groupings were not possible because
most of the measurements for development projects in PTS
are dependent on the specific nature of the work detailed in the
permit application. For example, the PTS data contained different
measurement units such as stories of a building, square feet, or
valuation of the construction in the permit application. Further, the
units of measurement recorded in PTS can vary from one permit
type to the next and can also vary from permit to permit within a
single permit type. Without a comparable unit of measurement for
all permits, we were unable to compare permits based on size.
We ultimately were able to identify the specific permit types of
building, site development, and conditional use, as well as the dates
Development Services determined that the permit applications
were complete and the dates it issued the permits. We were also
able to categorize San Diego’s neighborhoods by income categories.
Specifically, we identified the U.S. Census tracts within the areas
covered in the County of San Diego’s assessor/recorder/county
clerk’s map books, which identify the parcels in a certain area. We
then calculated the weighted average household income for each
map book area, using the household income and population data
from the U.S. Census Bureau’s American Community Survey for
each tract within the map book area. We categorized each map
book area by income, using the categories shown in Table B.1.
Table B.1
Income Ranges Used to Categorize Neighborhoods in the City of San Diego
INCOME CATEGORY MINIMUM MAXIMUM
Extremely low income $0 $24,100
Very low income 24,101 40,150
Low income 40,151 64,250
Moderate income 64,251 91,100
High income* 91,101 and over
Source: California Department of Housing and Community Development’s 2012 state income limits
for a four‑person household.
* The California State Auditor added this income category.
California State Auditor Report 2012-109 49
April 2013
The California Department of Housing and Community
Development uses these categories to determine households’
eligibility for certain assistance programs, and the categories are
ultimately based on the American Community Survey’s household
income data. By associating each permit’s book number—a
component of the parcel number—with the applicable income
category, we were able to calculate the number of permits and
average issuance time for the three permit types by neighborhood
income. Table B.2 presents the results of our analysis.
Table B.2
Amount of Time Taken Between January 1, 2010, and September 17, 2012, by the City of San Diego to Issue
Permits Categorized by Neighborhood Income
NUMBER OF AVERAGE TIME TO NUMBER OF AVERAGE TIME TO
TYPE PERMITS ISSUE PERMIT (DAYS)* NEIGHBORHOOD INCOME PERMITS ISSUE PERMIT (DAYS)*
lairetsiniM
Extremely low income 17 139
Very low income 464 82
Building permits† 5,158 83 Low income 2,431 79
Moderate income 1,114 124
High income 1,132 52
yranoitercsiD
Very low income 4 237
Low income 26 250
Conditional use permits 52 285
Moderate income 15 322
High income 7 362
Very low income 7 336
Low income 12 339
Site development permits 49 394
Moderate income 9 338
High income 21 468
Source: Analysis by the California State Auditor (state auditor) of data obtained from the Project Tracking System (PTS) from the City of San Diego’s
Development Services Department (Development Services). Please refer to Table 4 on page 18 of the Introduction for the state auditor’s assessment
of the reliability of these data.
Note: The Permit Streamlining Act generally requires any public agency that is the “lead” agency for a development project to approve or disapprove
the project within 180 or 90 days, as specified, from the date the lead agency certifies the environmental impact report, if such a report is required by
the California Environmental Quality Act. It is important to note that the dates in this table reflect a different period, namely, the time between when
an application is received and when a permit is issued.
* To calculate the number of days to issue a permit using PTS data, we subtracted the date on which Development Services determined each permit
application was complete from the date on which it issued the permit. Development Services stated that, for discretionary permits, the issuance
date recorded in PTS is not the official, legally binding issuance date.
† The table excludes 1,333 over‑the‑counter permits, which are building permits issued on the same day that applicants submit them because
Development Services reviews the plans and issues the permits while the customer waits.
We did not detect any consistent trends across permit types
with respect to permit issuance times and the location of the
development project. Table B.2 shows that higher‑income
neighborhoods had longer issuance times on average than did other
types of neighborhoods for the 49 site development permits and
50 California State Auditor Report 2012-109
April 2013
the 52 conditional use permits issued by Development Services.
On the other hand, Table B.2 shows that for the 5,158 building
permits issued by Development Services, moderate‑ and extremely
low‑income neighborhoods had longer issuance times on average
than did other types of neighborhoods.
Although the causes for the permit issuance times for all three types
of permits are generally unique to each project, we found a few
factors that can contribute to shorter or longer permit issuance
times. For each permit type shown in Table B.2, we reviewed
Development Services’ project files and records for the two permits
with the shortest and longest issuance times for each permit type;
Table B.3 shows these permits. For example, the Euclid Family
Health Center project may have had a short issuance time because
it was part of Development Services’ Affordable/In‑Fill Housing
and Sustainable Buildings Expedite Program, which expedites
permit processing for eligible affordable housing and sustainable
building projects.
Table B.3
San Diego Permits With the Shortest and Longest Issuance Times Between January 1, 2010, and September 17, 2012
SHORT PERMIT ISSUANCE TIME LONG PERMIT ISSUANCE TIME
DAYS TO ISSUE DAYS TO ISSUE
PERMIT TYPE PROJECT TITLE PERMIT* PROJECT TITLE PERMIT*
lairetsiniM Nokia Summit Rancho Bernardo‡ 1 Casoleil Apartments 702
Slope Repair
Building permits†
Uptown Terraces Deck‡ 1 Marina Cortez Tenant 718
Improvements
yranoitercsiD Camp Run‑A‑Mutt Sports Arena 100 University of Phoenix 711
Conditional use permits
Presidio Market 108 AT&T Monongahela Street 741
Sea Ridge Residence 61 Paradise Point 748
Site development permits
Euclid Family Health Center 107 Old El Camino Real Trail 889
Source: Analysis by the California State Auditor (state auditor) of data obtained from the Project Tracking System (PTS) from the City of San Diego’s
Development Services Department (Development Services). Please refer to Table 4 on page 18 of the Introduction section for the state auditor’s
assessment of the reliability of these data.
* To calculate the number of days to issue a permit using PTS data, we subtracted the date on which Development Services determined each permit
application was complete from the date on which it issued the permit. Development Services stated that, for discretionary permits, the issuance
date recorded in PTS is not the official, legally binding issuance date.
† The table excludes building permits issued by Development Services on the same day it received the application, known as over‑the‑counter
permits, because it reviews the plans while the customer waits.
‡ Of the 5,158 building permits submitted to and issued by Development Services between January 1, 2010, and September 17, 2012, 155 permits
were issued within one day of its determination that the applications were complete. We judgmentally selected these two projects from a
neighborhood with higher household incomes (Nokia Summit Rancho Bernardo) and a neighborhood with very low household incomes (Uptown
Terraces Deck).
California State Auditor Report 2012-109 51
April 2013
We also identified two factors that contributed to long permit
issuance times: administrative errors and Development Services’
policy for deficit deposit accounts. Administrative errors caused
delays in issuing the permits for the Casoleil Apartments Slope
Repair and Old El Camino Real Trail projects. For example,
the building permit for the Casoleil Apartments Slope Repair
project was part of a series of permits to build multiple garages
and a retaining wall. Although the other permits for the project
were issued in June 2011, the permit for one of the garages was
not issued until August 2012. According to one of Development
Services’ supervising plan specialists, this permit was overlooked
and probably not discovered until the developer called for
final inspections. Further, Development Services has a policy
that prohibits its employees from working on projects when
the applicants have deficits in their deposit accounts, which
Development Services uses to pay the fees for the applicants’ permit
review processes. For the University of Phoenix and Paradise Point
projects, the project managers stated that the high permit issuance
times were due to this policy.
52 California State Auditor Report 2012-109
April 2013
Blank page inserted for reproduction purposes only.
California State Auditor Report 2012-109 53
April 2013
Bob Filner
Mayor
City Administration Building
202 C Street
San Diego, CA 92101
April 2, 2013
Elaine M. Howle, CPA
State Auditor
California State Auditor
555 Capitol Mall, Suite 300
Sacramento, CA 95814
Dear Elaine:
Thank you very much for providing me with a draft of your report, “City of San Diego,
Although It Generally Followed Requirements for Reviewing Permits, It Could Do More
to Protect Historical Resources and to Notify the Public Properly About Its Actions”.
I appreciate the thoroughness with which your office reviewed the practices of the City
dealing with historical designation, construction change review, public notice of
environmental determinations, and employee disclosure of financial interests.
The recommendations provided in the audit offer several measures to ensure more
rigorous compliance with adopted law and regulations. All of the recommendations are
reasonable and appropriate and will be implemented by the City upon receipt of the
State’s final audit.
Thank you for providing the City with an opportunity to respond to the draft audit.
Sincerely,
(Signed by: Bob Filner)
BOB FILNER
Mayor
54 California State Auditor Report 2012-109
April 2013
Blank page inserted for reproduction purposes only.
California State Auditor Report 2012-109 55
April 2013
The City of San Diego
Ethics Commission
1010 Second Avenue, Suite 1530
San Diego, CA 92101
April 3, 2013
Elaine Howle, State Auditor*
Bureau of State Auditors
555 Capitol Mall, Suite 300
Sacramento, CA 95814
Re: State Audit No. 2012-109
DearMs. Howle:
The City of San Diego Ethics Commission submits the following response to the relevant
recommendation included within the report for above-referenced audit:
The Ethics Commission respectfully disagrees with the State Auditor’s contention that 1
the Ethics Commission is “not meeting the City Council’s expectations for enforcement
of its ethics training requirement.” In adopting Council Policy 000-04, the City Council
reasonably expectedthe Ethics Commission to provide biennial ethics training to the
City’s unclassified employees, which in fact the Ethics Commission has been doing since
the adoption of the Council Policy.
The Ethics Commission agrees, however, with the State Auditor’s conclusion that its
training program is not aligned with the Council Policy requirement that biennial training
revolve around a March 31 deadline. In order to achieve technical compliancewith
Council Policy 000-04, the Ethics Commission will ask the City Council to amend the
Council Policy in order to remove the language concerning the March 31 deadline. The
Commission staff will calendar this legislative proposal afterit has completed its current
efforts to amend the City’s campaign laws, which is anticipated to take placesometime
between July and September of 2013.
If you have any questions concerning this response, please contact me at your
convenience.
Sincerely,
(Signed by: Stacey Fulhorst)
Stacey Fulhorst
Executive Director
* California State Auditor’s comment appears on page 57.
56 California State Auditor Report 2012-109
April 2013
Blank page inserted for reproduction purposes only.
California State Auditor Report 2012-109 57
April 2013
Comment
CALIFORNIA STATE AUDITOR’S COMMENT ON
THE RESPONSE FROM THE CITY OF SAN DIEGO’S
ETHICS COMMISSION
To provide clarity and perspective, we are commenting on the
response to our audit report from the City of San Diego Ethics
Commission (commission). The number below corresponds to the
number we placed in the margin of the commission’s response.
1
The commission’s characterization of the code of ethics and
ethics training policy adopted by the San Diego City Council (city
council) is incorrect. As we state on page 37, the city council’s
policy specifically requires unclassified employees who file a
Statement of Economic Interests (Form 700) upon assuming office
in even‑numbered years to complete ethics training no later than
March 31 of each even‑numbered year thereafter. Similarly, the
policy requires those unclassified employees who file a Form 700
upon assuming office in odd‑numbered years to complete their
ethics training no later than March 31 in odd‑numbered years.
In its policy, the city council clearly expresses its expectation
for when the commission should provide ethics training to the
city’s unclassified employees. As we discuss on page 37 and as the
commission acknowledges in the second paragraph of its response,
the commission does not administer the ethics training for
unclassified employees in accordance with the city council’s policy.
58 California State Auditor Report 2012-109
April 2013
cc: Members of the Legislature
Office of the Lieutenant Governor
Little Hoover Commission
Department of Finance
Attorney General
State Controller
State Treasurer
Legislative Analyst
Senate Office of Research
California Research Bureau
Capitol Press