FCMAT
Anaheim City School District Follow-Up Letter
organizational and staffing review
Read the report at Anaheim City School District Follow-Up Letter ↗
January 13, 2016
Linda Wagner, Ed.D., Superintendent
Anaheim City School District
1001 S. East Street
Anaheim, CA 92805
Dear Superintendent Wagner:
The purpose of this letter is to provide the Anaheim City School District with an update regarding prog-
ress made in addressing the recommendations identified by the Fiscal Crisis and Management Assistance
Team (FCMAT) in its final report dated February 12, 2014.
In August 2013, the district entered into an agreement with the Fiscal Crisis and Management Assistance
Team (FCMAT) for a study to perform the following:
Conduct an organizational, staffing and efficiency review of the district’s facilities and maintenance oper-
ations, including grounds and custodial operations.
a. Provide comparative staffing data for districts of similar size and type and make rec-
ommendations to improve operational efficiencies that may reduce district costs. The
comparison will include at least three comparable school districts and may include
those utilized in collective bargaining by the district.
b. Review job descriptions for all facilities and Maintenance Department positions,
evaluate capacity, scheduling, efficiency and functions, and make recommendations
for staffing and operational improvements. Include estimated calculated values for any
proposed position reductions or enhancements to the organizational structure.
c. Evaluate the operational work flow of each departmental function for the facilities
and maintenance areas and make recommendations for improved efficiency and stan-
dard industry practices, if any.
d. Review and make recommendations for the proposed position of energy manager,
which is to assist in the development and monitoring of energy efficient projects. The
position is proposed to be funded from Proposition 39 funds approved by the voters
in November 2012. Proposition 39 provides funding for energy efficient projects and
to create clean energy jobs.
The report issued in February 2014 provided a number of recommendations for the operational areas
identified in the scope of work.
FCMAT
Joel D. Montero, Chief Executive Officer
. .
1300 17th Street - CITY CENTRE, Bakersfield, CA
.
93301-4533 Telephone 661
.
-636-4611 Fax 661
.
-636-4647
755 Baywood Drive, 2nd Floor, Petaluma, CA 94954 Telephone: 707-775-2850 Fax: 661-636-4647 www.fcmat.org
Administrative Agent: Christine L. Frazier - Office of Kern County Superintendent of Schools
FCMAT revisited the district on November 19 and 20, 2015 to collect data, conduct interviews and
review supporting documentation to evaluate the district’s progress on implementing recommendations
contained in the February 2014 report. The following comments summarize the district’s progress.
2
Maintenance
Recommendation
1. Reorganize the Maintenance Department with traditional classifications of general
maintenance work and skilled maintenance workers.
Status: In Progress
The district has partially implemented the recommendation. The plumber position is now supervised by
the supervisor of maintenance and operations who supervises all maintenance trades workers. However,
the five general maintenance workers are still supervised by the other supervisor of maintenance and
operations, who has responsibility for custodians and grounds.
Recommendation
2. Designate supervisors as either maintenance or operations/grounds, but not both.
Status: Not Implemented
The district has no plans to implement this recommendation; the district feels that it is important to
promote the cross training of supervisors for coverage. The district wishes to retain flexibility to direct
maintenance, operations and grounds staff using either supervisor.
Recommendation
3. Ensure that concerns are addressed through the supervisory structure and not directly
to upper levels of governance.
Status: In Progress
The maintenance and operations director has had discussions with the entire maintenance and opera-
tions crew regarding span of control and chain of command. The district plans to provide more training
regarding the basics of organizational theory. A change in the composition of maintenance and oper-
ations staff and the district’s governing board has also resulted in fewer concerns not being channeled
through the chain of command.
Recommendation
4. Train staff so that the evaluation process is consistent and meaningful. The evaluation
form should be revamped to include a greater rating span.
Status: In Progress
Both supervisors of maintenance and operations plan to work with the Human Resources Department
and the Classified School Employees Association (CSEA) to consider revamping the evaluation form.
This will require a significant commitment of time from the assistant superintendent of human resources.
3
Recommendation
5. Continue morning meetings and work order accountability procedures, and add a
brief afternoon meeting to verify all staff are accounted for and safe.
Status: In Progress
The recommendation is partially implemented. The district will continue morning meetings but does
not currently see a need for afternoon briefing. The district is, however, considering providing training to
maintenance and operations staff during afternoons. The district will continually assess the need for an
afternoon meeting.
Recommendation
6. Continue conducting weekly safety meetings and assigning staff to present safety
topics. More hands-on safety training and equipment safety training should be added.
Status: Implemented
The district continues to hold weekly safety meeting and has worked with the Alliance of Schools for
Cooperative Insurance Programs (ASCIP) – its property and liability insurance provider – to provide
quarterly safety meetings. The Maintenance and Operations Department has also provided weekly safety
trainings to its staff. The department has access to and uses an extensive catalog of safety videos; however,
more hands-on training should be provided to maintenance, operations and grounds personnel.
Recommendation
7. Consider requiring and supplying steel-toed boots for maintenance and grounds personnel.
Status: In Progress
The maintenance and operations safety committee held two meetings to discuss this topic before asking
for an independent assessment of the need for steel-toed boots for maintenance, operations and grounds
personnel. An independent evaluation provided by Pom & Associates stopped short of recommending
steel-toed boots; however, it did recommend that the positions of gardener, mechanic, maintenance
worker, electrician, painter, warehouse operator, and HVAC & refrigeration mechanic may require per-
sonal protective equipment, including foot protection, to protect them from crushing from falling objects
or rolling cylinders, puncture from sharp objects, burns from molten metal or hot surfaces, skin contact
or burns from chemicals, and slips and falls on wet or slippery surfaces. The district should evaluate each
job classification in the maintenance, operations and grounds department, using the criteria established
in Title 8, Section 3385 of the California Code of Regulations, to identify which positions should be
provided with the appropriate foot protection.
Recommendation
8. Find alternative means for storage of long-term, bulk items such as carpet. The district
should investigate using the storage in its warehouse system or work with supplying
vendor to store stock in the vendor warehouse.
Status: Implemented
The district orders carpet and other long-term bulk items on a just-in-time basis. Occasionally, carpet will
be left over from a modernization project and will be stored until such time that the maintenance and
operations department needs it for a minor project.
4
Recommendation
9. Hire a low-voltage technician to address new energy management systems issues as
well as alarm and other low-voltage systems in the district.
Status: Implemented
The district has hired a low-voltage technician.
Recommendation
10. Consider hiring one additional HVAC technician.
Status: Implemented
The district has hired an additional HVAC technician.
Recommendation
11. Ensure that management is the primary contact when working with work order
requestors to determine the feasibility and costs of projects as well as communicating
whether the work order can be completed.
Status: Implemented
School sites have access to the Order Processing and Requisition Accelerator (OPRA) automated work
order system. However, only system administrators can authorize the processing of work orders through
the system. The district previously had 12 employees who had administrator privileges on the OPRA
system. The maintenance and operations director has reduced this to four. This has greatly streamlined
the flow of communication between the work order initiator and the maintenance department and the
effectiveness of the work order system.
Recommendation
12. Develop a more efficient work order feedback system, exploring staff use of digital
devices for entering work order data.
Status: In Progress
The maintenance and operations department has purchased and furnished twenty Chromebooks for staff
to enter work order data, including the cost of labor and materials for each work order assigned, and for the
assignees to provide updates on the status of each work order. Timely submission of data by the assignee
enables the maintenance and operations director to review whether a work order has been completed.
Recommendation
13. Clarify in writing the protocol for purchasing supplies and the limits for notification
versus the limits for requiring competitive quotes.
Status: Implemented
The director of maintenance and operations provided FCMAT with the maintenance and operations adminis-
trative rule based on Board Policy 3300 dated July 1, 2014. This administrative rule indicates that maintenance
and operations department personnel are directed to secure approval from their supervisor or the director for
all expenses of $500 or more before committing funds or purchasing materials and services. Department per-
sonnel are required to provide a minimum of three quotes before incurring cost to the district.
5
Recommendation
14. Ensure department directors have a cooperative relationship and are unified when
working with and within their departments.
Status: Implemented
The assistant superintendent holds monthly joint directors’ meetings with Facilities and M&O directors
to facilitate improved collaboration. This has greatly increased collaboration and fostered a sense of team-
work between the Maintenance and Operations and Facilities departments.
Recommendation
15. Ensure maintenance leadership is included in facilities planning, construction, and
completion, and does not supplant the proper completion tasks of contractors.
Status: Implemented
The Maintenance and Operations Department management are regularly invited by the facilities plan-
ning and construction staff to review plans and specifications prior to projects being bid for construction.
Recommendation
16. Develop and adhere to district furniture and equipment standards. Deviations
should be the result of discussions between Facilities Department and Maintenance
Department leadership.
Status: Implemented
Improved communication and collaboration between the Facilities and Maintenance and Operations
departments ensures that deviation from district furniture and equipment standards does not occur in the
future.
6
Custodial (Operations)
Custodial Supervision
Recommendation
1. Continue to ensure clear roles of supervision are communicated to lead custodian and
custodian positions.
Status: In Progress
The newly hired supervisor of maintenance and operations is meeting with the custodial staff of each
school site to provide support and to improve the flow of communication, establish expectations, and
hold them accountable for work performed.
Recommendation
2. Continue to promote communication between the maintenance and operations
supervisor and the site administration to support consistent oversight and reasonable
expectations.
Status: In Progress
The district has hired a lead operations custodian who has responsibility for all night custodians who
work from 1 p.m. to 10 p.m. This has vastly increased communication between the day and night custo-
dians and has provided much needed accountability between the two groups.
Custodial Job Descriptions
Recommendation
1. Regularly review and update custodial job descriptions to ensure they are current and
relevant.
Status: In Progress
A review of custodial job descriptions shows that the descriptions for these positions have not been
updated since 2000. Both supervisors of maintenance and operations plan to work with the Human
Resources Department and the Classified School Employees Association (CSEA) to update them. This
will require a significant investment of time from the assistant superintendent of human resources.
Recommendation
2. Regularly review and update the maintenance and operations organizational chart to
reflect current chain of authority.
Status: Implemented
The Maintenance and Operations Department has updated its organizational chart to reflect the current
span of control of each supervisor, the chain of command between supervisors and subordinates and the
relationship between line and staff authority. The updated organizational chart should be posted to the
department’s page on the district’s website:
7
Maintenance & Operations Department
2015-16
Assistant Superintendent, Administration
Director of M&O
Director’s
Secretary
Maintenance Maintenance School Site
and Operations and Operations Administrators
Supervisor Supervisor
Lead Custodian
(25)
Electrician (2) Skilled Grounds and Night
Maintenance (6) Landscape (8) Operations
Lead Custodian
Custodian (39)
HVAC (3) Skilled Floor Irrigation Team
Maintenance (2)
Painter (2) Skilled Lock Maintenance
Worker (5)
Maintenance
Low-Voltage
Plumber
Technician
Custodial Procedures
Recommendation
1. Implement one of the following:
• Develop and maintain comprehensive custodial procedures as part of the maintenance and
operations manual.
• Review, update, and date the Custodial Handbook so that it indicates the most recent
review or revision.
Status: In Progress
The district’s newly hired supervisor of maintenance and operations is in the process of creating an
entirely new custodial handbook. The handbook is in draft form. When completed, the custodial hand-
book will serve as a guide to custodians, principals, and teachers as to the duties and responsibilities of
8
the district’s custodians. In doing so, the handbook will set a new standard in which the performance of
custodians may be measured.
Custodial Scheduling
Recommendation
1. Continue to ensure detailed custodial schedules are developed for each site and for
each custodial position.
Status: Implemented
FCMAT has reviewed the custodial scheduling for most district sites. The schedules were developed
uniquely for each site, but are consistent in content and structure. They include start and end times,
lunch and break times, and are specific to within 5- to 10-minute increments in listing the duties to be
performed from opening to closing school grounds each day. The schedules list the areas that should be
cleaned each day and reference campus maps indicating areas that are cleaned rotationally every week.
The schedules also include other duties such as Monday morning checks for weekend vandalism and
monthly checks of fire extinguishers and roofs. Some schedules include deep and periodic cleaning work
that is to be performed if time allows.
The schedules reviewed all contained common items such as security, safety, and priority/daily cleaning
tasks, but were adjusted to the specific needs of each site. Sites’ opening and closing procedures intensity;
number of restrooms, classrooms, etc.; and sites’ age, layout, and construction all contributed to differ-
ences in site custodial needs and influenced schedules.
Recommendation
2. Regularly review and update the schedules to meet changing needs of the site.
Status: In Progress
The district’s newly hired supervisor of maintenance and operations is reviewing each custodial schedule
and making changes as necessary.
Recommendation
3. Develop a master custodial template for use throughout the district to help sites
develop, edit, and archive their schedules.
Status: In Progress
The district’s newly hired supervisor of maintenance and operations is creating a master custodial tem-
plate.
Custodial Standards
Recommendation
1. Develop and adopt acceptable standards and expectations of cleaning.
Status: In Progress
The draft custodial handbook establishes an exhaustive number of cleaning standards for custodial staff.
The standards identify both the areas of school campuses to be cleaned and the frequency that cleaning
9
should occur. The handbook also identifies the cleaning techniques to be used in different areas, includ-
ing classrooms, halls, stairways and landings, elevators, bathrooms, offices, entryways, (serving) kitchens,
cafeterias and multipurpose rooms/auditoriums.
Recommendation
2. Communicate the acceptable standards and expectations to the staff.
Status: In Progress
The draft custodial handbook is a vehicle for communicating cleaning expectations to staff. In its final
form, the custodial handbook will serve as a reference document for custodians, principals, teachers and
managers as to whether district custodians are performing to district custodial standards.
Custodial Staffing
Recommendation
1. Establish districtwide standards and expectations for custodial functions considering
available funding and the desired level of cleaning.
Status: In Progress
The draft custodial handbook establishes an exhaustive number of cleaning standards for custodial staff.
The standards identify both the areas of school campuses to be cleaned and the frequency that cleaning
should occur. The handbook also identifies the cleaning techniques to be used in different areas, includ-
ing classrooms, halls, stairways and landings, elevators, bathrooms, offices, entryways, (serving) kitchens,
cafeterias and multipurpose rooms/auditoriums.
Recommendation
2. Staff custodial to meet level 3 cleaning expectations.
Status: Implemented
The district staffs at or above level 3 cleaning standards.
Recommendation
3. Routinely re-evaluate the standards and expectations, and staff accordingly.
Status: In Progress
The district’s draft custodial handbook indicates that the handbook is a work in progress. As improvements
in custodial techniques and methods become apparent, certain aspects of the handbook will be revised.
Custodial Cooperation
Recommendation
1. Encourage cooperation and teamwork between work classes.
Status: In Progress
The new supervisor of maintenance and operations is attempting to foster teamwork between the general
and skilled maintenance workers by ensuring that general maintenance workers have the opportunity to
10
increase their skills by working on a limited basis in skilled maintenance worker positions. For example,
the newly instituted “out of class program” enables general maintenance workers assigned to the grounds
crew to work with the skilled maintenance crew as painters on a voluntary basis and receive out of class
pay for a limited duration. In return, gardeners may backfill for the general maintenance workers during
this period of time and also receive training in general maintenance and earn out of class pay. In this
respect, both groups have the opportunity to learn something new and receive out of class pay. The out
of class program has also saved the district money by eliminating the need to contract out for certain
painting projects.
Recommendation
2. Promote communication between employee groups concerning levels of service satis-
faction and expectations.
Status: In Progress
The new supervisor of maintenance has started to work on increasing collaboration among the mainte-
nance, operations and grounds employees by fostering understanding of each other’s jobs. He has also
started to rotate assignments among staff within each department.
Recommendation
3. Support the most efficient use of district resources through cooperative efforts to pro-
vide an environment that is clean, safe, and conducive to learning.
Status: In Progress
Although great strides have been made in collaboration between the maintenance, operations and
grounds departments, there is still a long way to go. The FCMAT review cited specific examples of coop-
eration between members of the district’s maintenance and operations staff, and instructional staff can
greatly increase the efficiency of custodial efforts.
One example is for teaching staff to leave their classrooms in order by straightening furniture, collecting
large pieces of rubbish, and avoiding the placement of fluids in trash receptacles. Because this does not
always occur, custodians were observed spending twice the amount of time preparing to clean classrooms
as they did on the actual cleaning. Another example is having maintenance and grounds personnel elimi-
nate or minimize the clutter left from performing a repair job. This can be easily accomplished by placing
a tarp to catch trimming debris or avoid blowing grass onto the sidewalk, greatly reducing the work of
the custodian.
11
Grounds
Recommendation
1. Consider adopting the Florida Department of Education grounds maintenance staff-
ing formula or other models as a general guideline for adding or reducing grounds
maintenance personnel.
Status: Not Implemented
The newly hired supervisor of maintenance and operations had been in his position less than a month
at the time of FCMAT’s follow-up review. He has spent much of his first month observing the custodial
and grounds staff and focusing on improving custodial operations. He indicated that he will spend
the next month or so concentrating on staffing, scheduling and other improvements in the Grounds
Department.
Recommendation
2. Reassign the plumber to the Maintenance Department to align the maintenance
function of plumbing with the department’s organizational structure.
Status: Implemented
Recommendation
3. Either reassign the four maintenance workers from grounds to maintenance and have
them perform maintenance duties, or reclassify them as grounds keepers with duties
related to grounds.
Status: Not Implemented
Recommendation
4. Establish a schedule for the grounds crew to rotate among school sites and adhere to
it until all schools are completed.
Status: Not Implemented
The newly hired supervisor of maintenance and operations had been in his position less than a month
at the time of FCMAT’s follow-up review. He has spent much of his first month observing the custodial
and grounds staff and focusing on improving custodial operations. He has indicated that he will spend
the next month or so concentrating on staffing, scheduling and others improvements in the Grounds
Department.
Recommendation
5. Limit the frequency that grounds keepers are taken from their assigned duties to per-
form other functions.
Status: Not Implemented
12
Recommendation
6. Enable the irrigation specialist to review landscape architect plans to ensure that the
grounds crew has the financial resources and technical expertise to maintain irrigation
systems and vegetation proposed in the plans.
Status: Implemented
This appears to be occurring as a result of the increased cooperation between the Maintenance and
Operations and Facilities departments. The supervisor of maintenance and operations may want to
expand this review to include gardeners to review the types of turf, plants and trees specified in landscape
architecture plans.
Recommendation
7. Standardize irrigation components, such as sprinklers and controllers, so that the
grounds crew is not required to stock and maintain several different systems.
Status: In Progress
The implementation of this recommendation will take time as older irrigation components become
obsolete and newer ones are used for replacement or are specified in new projects. The supervisor of
maintenance and operations is aware of the recommendation and will seek opportunities to standardize
irrigation components wherever possible.
Recommendation
8. Establish a grounds equipment replacement budget based on the life cycle of grounds
equipment, especially the large riding mowers.
Status: In Progress
The supervisor of maintenance and operations is taking inventory and evaluating the condition of the
department’s equipment and vehicles. The supervisor is aware that two of the district’s riding mowers are
at the end of their life expectancy and he is exploring the option of leasing a riding mower rather than
having the district incur a large capital expense for the purchase of a new mower.
Recommendation
9. Stagger the purchases of grounds equipment so that the district can budget for equip-
ment replacement over several years and the various pieces of grounds equipment do
not reach the end of their life cycles at the same time.
Status: In Progress
The supervisor of maintenance and operations is taking inventory and evaluating the condition of the
department’s equipment and vehicles. This is the first step in establishing a life-cycle equipment replace-
ment budget.
13
Facilities
Since the February 12, 2014 FCMAT report, the Facilities Planning and Construction Department has
undergone significant personnel change. Fully 100% of management staff have retired, resigned or oth-
erwise left the district since 2013. Only the two facilities technician line staff positions have not changed,
and at the time of the FCMAT follow-up visit in November 2015, one of the facilities technicians was
transferring to another department. This leaves only one employee who has remained in the department
over the past 2 to 2.5 years. Besides the director, who has been in place since September 2014, and the
construction manager (independent contractor) since January 2015, the assistant director and supervisor
of construction projects have been in the district only since September/October 2015.
Because of this significant staff turnover, several of the original FCMAT recommendations have not yet
been implemented. Staff and management report that it is a work in progress and they intend to continue
with the implementation of the recommendations and overall department operations improvements.
Staffing
Recommendation
1. Change the maintenance and operations supervisor - supervisor of construction
title to supervisor of construction, transferring the position from the Maintenance
Department to the Facilities Department to reflect actual operations.
Status: Implemented
Upon the retirement of the previous maintenance and operations supervisor - supervisor-construction,
this position’s title was changed to supervisor of construction projects and the position was moved
from Maintenance to the Facilities Department. The new organizational chart and interviews show this
position reporting directly to the contracted construction manager. The job description states that the
position reports to the director of facilities. The district should ensure that the employee and department
understand that the supervisor of construction projects reports to the director of facilities and is evaluated
by the director, but that he works to assist and as a team with the contracted construction manager.
Communication between the director and the construction manager is vital to smooth operations with-
out confusion on direction to the employee.
Recommendation
2. Review IRS guidelines regarding employees versus independent contractors to ensure
that it is not exposed to federal employment taxes if the IRS deemed that the project
managers are employees.
Status: Implemented and May Need Periodic Review
The district reports that IRS guidelines were reviewed by the previous assistant superintendent and Fiscal
Services in 2014, and they are satisfied that the construction manager position is appropriately deemed
a contracted position. If desired, the district’s new assistant superintendent may wish to confirm this
periodically under current IRS guidelines to limit the district’s exposure to additional taxes, fines and
penalties.
14
Recommendation
3. Transfer all accounting/payment processing duties, including those associated with
the Colbi Account-Ability system as well as other accounting processing duties, to the
facilities technician under the supervisor of construction.
Status: Not Implemented
The district reports that to provide cross-training and ensure coverage during vacations, both facilities
technicians continue to be responsible for Colbi accounting system input: one for construction and one
for planning and similar expenditures. Staff reported that this division of duties has enabled the director
to review the input activities and effectively monitor and correct data input errors.
Staff reported that eventually the facilities technician in the construction area will take the lead on the
Colbi system. There were two Colbi training workshops, one in the spring and one in the fall. Both facil-
ities technicians as well as the director and an employee from Fiscal Services have attended some Colbi
training workshops, but it was reported that one workshop was not attended because of a high depart-
mental workload. Both facilities technicians, as well as Fiscal Services personnel, should attend both the
fall and the spring Colbi workshops and leave adequate time in the calendar for consistent attendance.
Staff reported that the workshops were valuable for the departments to learn the system, get questions
answered, and discuss any customizing of the system so the district gets the best value for the fees it pays
for the system.
The facilities technician with planning vendor responsibility was transferring to another department in
late 2015. The district should ensure that the job description is reviewed and updated. The updated job
description should include the requirement to either be familiar with or become trained and proficient
on the Colbi system within a set period of time. It should include knowledge and comfort working with,
or required training for, automated databases and the district’s accounting system. This should include
familiarity with the online manual and text message helpdesk to save costs that are incurred when the
district calls Colbi for assistance.
Recommendation
4. Change the duties of the facilities technician under the director of facilities so that
they focus on providing the director with administrative assistance.
Status: Not Implemented
The department’s organizational chart shows three facilities technicians and does not include an adminis-
trative assistant (AA). With the transfer of one of the facilities technicians, staff reports that a temporary
district substitute is to be hired until a new facilities technician can be hired, with the possibility of utiliz-
ing the substitute as a de facto AA to evaluate whether a part-time or full-time AA is needed.
Previously, the facilities technicians were not empowered or trained adequately to do technical work.
Management and staff reported that they are now more involved in the projects, including bid openings,
public outreach meetings, and due diligence of invoices. This higher level of technical training and
responsibilities should continue.
15
Recommendation
5. Train the facilities technician under the director of facilities in the areas of facilities
through CASH and CASBO workshops.
Status: Partially Implemented
Both staff and management report that the facilities technicians have received more training since the
original FCMAT report. The trainings include some county office of education seminars, a few regional
or local CASH workshops, and some training with vendors or company representatives providing infor-
mation on facilities and maintenance products and systems.
However, it was reported that the CASH annual conference was not attended, nor were CASBO work-
shops or conferences. In addition, it appeared that some trainings were planned but not attended because
of workload and deadlines. With the recent additions of the assistant director and a possible administra-
tive assistant, the trainings and workshops should be more consistently planned for and attended. Staff
should also provide follow-up debriefing reports from workshops and conferences and should share any
paper and electronic handouts and materials with the entire department at departmental meetings.
Recommendation
6. Transfer the duties of providing clerical/administrative assistance to the citizens’
oversight committee from the secretary of the chief business officer to the facilities
technician under the director of facilities.
Status: Not Implemented
The office of the assistant superintendent of business administration will continue to provide citizens’
oversight committee (COC) reports that come from several departments. The Facilities Department will
continue to provide reports and information for the COC agenda packets as needed, including budget
reports and construction project updates.
Note: Staff reported that some members of the two COCs have served on the committees for longer than the
required maximum of three terms of two years each, for a total of six years.
The district should conform with the term limits for COC members to provide transparency and confidence
with the community and taxpayers that Proposition 39 requirements are being met.
Recommendation
7. Assign the contracted construction managers with tasks related to developing district
design standards, plans and specifications while working with the architects, architect
agreement, training and project turnover procedures, and other related programwide
facilities.
Status: In Progress
As part of the significant organizational chart and personnel changes that the Facilities Department has
undergone since the original FCMAT report, an assistant director position was created in 2014-15 and
filled for the first time in October 2015.
The assistant director is responsible for managing, planning and coordinating tasks and activities in the
areas of demographics, planning, design, funding and construction, under the supervision of the director.
16
At the time of the FCMAT follow-up report, the assistant director reports working on the planning and
design processes, including due diligence and quality control on plans and specifications; managing the
procurement of architect/engineering services; contract negotiation and administration; payment due
diligence; and management of the bidding process.
The Facilities Department is collaborating with the Purchasing Department to standardize agreements
across the two departments for consistency and to ensure the contracts protect the district’s interests.
The assistant director position is establishing new processes and procedures for planning and construction
projects, including during planning and design through procurement of professional and construction
services. He uses request for proposal and request for qualifications processes as well as public works projects
competitive bidding. It is important for these new processes and practices to be memorialized into depart-
ment operations and procedures manuals so these processes become familiar to other department staff.
One of the early focuses of the assistant director is to organize plans and specifications of past projects,
including plan room organization, document filing and electronic digitizing.
The district’s design standards that previously resided in three binders on a shelf have now been scanned
into PDF electronic documents on the district’s network. The district’s design standards will be updated
as part of the Facilities Master Plan update process with outside planning and architectural firms that
were recently hired. The intent is that the standards will be updated through input from several sources,
including meetings with maintenance and operations staff and management. The district facility stan-
dards have not yet been approved by the governing board. Once they are updated as part of the Master
Plan process, they should be approved by the board and incorporated and enforced in the architect/
engineer service agreements.
The assistant director reported that the new facilities design standards will be incorporated into all future
projects as needed, referenced in the architect/engineering professional services agreements and given to
the design team. The plans will be more extensively reviewed at each planning phase and the construction
manager/plan holder should be the sign-off on the requests for substitutions after review and recommen-
dation by the design team.
The director, assistant director and maintenance director will be given the construction documents,
including addenda, at every planning phase. The maintenance director will provide a set of plans and
specifications in the Maintenance Department, and maintenance staff should be provided adequate time
to review the plans. Each trade shop in the Maintenance Department may be asked to physically sign off
on the plans.
On submittals, both the Facilities and Maintenance departments will be given deadlines to review and
provide comments on the submittals to be returned to the construction manager and then to the design
team.
Staff reported that new processes to develop the specifications and substitution requests were piloted with
the recent Stoddard project. M&O staff input was used to develop the Stoddard specifications, comments
were recorded, and the intent is that the documents will reside as Google Docs that will be updated with
lessons learned. All of these new processes and procedures need to be recorded into procedures manuals
and distributed to staff, with staff trained to use the processes and the processes adhered to on future
projects.
Staff reported that the substitution request process (no less than 10 days prior to bid opening is one
provision) needs to be approved by the governing board and then incorporated into the standard bid
documents.
17
Recommendation
8. Transfer project management for large bond projects to the contracted construction
managers.
Status: Implemented
Large bond project construction management is assigned to the construction manager. Since the original
FCMAT report, the district has undergone significant improvements in the organizational chart and
staffing in the Facilities Department, including a clarification of responsibilities of construction manager
and those of the supervisor of construction projects employee.
Recommendation
9. Transfer the DSA closeout responsibility to the supervisor of construction.
Status: Not Implemented
Because the newly hired supervisor of construction projects is relatively inexperienced in public works
projects, the construction manager handles this responsibility. The new DSA project closeout process,
using the DSAbox online procedures, should assist greatly in closing out current projects.
DSA certification and closeout of older projects should be overseen by the assistant director and per-
formed by the construction manager and assistant director, as workload and schedules allow. The supervi-
sor of construction projects should be trained in this area as well as in the new box procedures for current
projects.
Recommendation
10. Transfer supervision of the contracted construction managers to the director of facilities.
Status: Implemented
Per the Facilities Department organizational chart below, the contractor construction manager now works
under the director of facilities.
Recommendation
11. Assign smaller, nonbond project management to the supervisor of construction.
Status: Implemented
The previous joint maintenance/facilities construction supervisor position has been changed to the
construction manager (now one position/one firm), who oversees the supervisor of construction projects,
who handles the smaller and nonbond projects at this time. The employee filling this position is inexpe-
rienced with public works projects and should continue to shadow the construction manager position.
Because this position is responsible for multimillion-dollar projects, the district should provide additional
training to this employee (including CASH workshops), specifically in public school facilities projects
laws and regulations, and should require that he report frequently and in detail to the construction man-
ager on all project activities.
Recommendation
12. Develop written procedures for moving in and out during modernization projects, to
be overseen and developed by the supervisor of construction.
18
Status: Not Implemented
Projects in the works as of November 2015 do not include large modernization projects that would
require complex move-in/move-out procedures, but because of the past miscommunications and prob-
lems, these processes should be completed well ahead of any future projects.
Facilities Planning and Construction Department
Full Previous Organizational Chart
Director, Facilities and Planning
Maintenance Facilities Technician Facilities Technician 0.5 FTE Facilities
and Operations Technician (open)
Supervisor -
Construction
(Construction
Supervisor)
Project Manager Project Manager
(Contracted) (Contracted)
Facilities Planning and Construction Department
New Organizational Chart
Director, Facilities and Planning
Construction Assistant Director,
Manager Facilities and
(Contracted) Planning
Supervisor of
Facilities Technician Facilities Technician Facilities Technician
Construction
Projects
19
Interpersonal Relationships
Recommendation
1. Enforce professional behavior among all levels of management in the Facilities and
Maintenance departments with strong disciplinary consequences for noncompliance.
Status: Implemented
Professional behavior norms are communicated and enforced through semi-monthly management meet-
ings with department heads and the assistant superintendent. Facilities and maintenance management
also regularly meet, and a positive collaborative climate with professional behavior is being built among
all departments.
Facilities management reports that all affected departments are written into construction project schedule
milestones, including the energy manager, educational services and maintenance.
Recommendation
2. Train the directors of maintenance and facilities to improve communication and
collaboration. This could be facilitation and training in communication and collabo-
rative techniques through a third-party facilitator/trainer.
Status: Implemented
Newly hired staff were brought on with the expectations of high level of communication and collabora-
tive techniques, as enforced by the assistant superintendent. These staff members are instituting regular
written and verbal communications. Employee and department handbooks and best practices guidebooks
should be written to institutionalize the new communication and collaboration methods.
Recommendation
3. Develop a space use review of facilities/maintenance, and make changes if needed.
This should be accomplished through the collaborative efforts of the directors of
maintenance and facilities.
Status: Implemented
The problem has been resolved through collaboration between the facilities and maintenance directors, and
space is being used more effectively. There is now open meeting space on the first floor, and the upstairs con-
ference room is now shared between the two departments. During the FCMAT interviews, it appeared that
additional space is used as plan and document storage; any proposed change in the space utilization should
be decided in collaboration between the two departments and not undertaken unilaterally.
Recommendation
4. Through the collaborative efforts of the directors of maintenance and facilities,
develop a protocol for the implementation of new project requests, including those
that are smaller, site-requested, and rely on volunteers.
Status: In Progress
The Maintenance and Facilities departments are beginning the implementation of the OPRA work order
system not just for maintenance projects, but for all projects and facility needs requests from principals
and other parties.
20
The plan is for school site principals to input all facility requests into the OPRA work order system.
The director of maintenance would then screen the request and assign it either as a facilities item or a
maintenance item, using DSA requirements as one criterion. The maintenance director would then create
a list of items that are not maintenance-related or are small capital projects. He would bring the list to
the semi-monthly directors’ meeting. Either the assistant superintendent or the Cabinet would approve
the project. At the directors’ meeting, funding, costs, timeline and prioritization would be discussed.
Decisions about each project would then be followed up by communicating to the school principal.
This is a new system, and staff reported that no project for the Facilities Department has been approved
through this system yet.
Issues and questions remain on the roll-out of this process, including who has access to a master list of
projects, how completed items and items in progress are shown, the method for assigning projects to
either the Maintenance or Facilities departments, how the district’s Technology Department processes
requests, and how to manage expectations from school site principals about whether simply inputting a
request into the system means that it will be done eventually or how it will be prioritized. Also, there are
questions on how to assign a number and how staff will know whether the project is completed or not.
Additional training and practice on the new system are needed to maximize effectiveness. Overall, staff
believe it is a positive change and needed improvement and will serve to demonstrate to the school sites
that their facilities needs are being heard and entered into a system.
It is important to know whether proposed projects are subject to Division of the State Architect require-
ments or not, including smaller and volunteer projects. Staff reported that currently, the maintenance
director vets the projects and makes this decision. However, decisions on whether a project is under the
DSA or not should be discussed by facilities and design team professionals along with the Maintenance
Department. These decisions should be made as a team including Maintenance, Facilities and design
team professionals (when needed) to limit liability exposure to the district.
The new system and any improvements in the procedure should be discussed in staff meetings and in
directors’ meetings, and any procedure changes written and communicated with school principals.
Recommendation
5. Through the collaborative efforts of the directors of maintenance and of facilities, help
the contracted construction manager develop turnover and training procedures for
new and modernization projects.
Status: In Progress
The assistant director is developing protocols for construction projects, as well as a master schedule
template. The turnover and warranty work process transitioning from the contractor to the Maintenance
and Facilities departments for new construction and modernization projects should be included in an
employee handbook and Facilities and Maintenance department best practices guidebook.
The construction manager states that current practice is to formally request a meeting with the mainte-
nance director and appropriate staff for training on the facility.
The maintenance director has requested improvements in the turnover and training process, and these should be
implemented. The informal meeting with the construction manager and maintenance needs to be scheduled to
verify availability of all trades involved, with sufficient lead time for maintenance staff to shift workload and be
available for the meeting. The scheduled training meeting(s) should be video recorded for future use by those who
could not attend, those who wish to review and for newly hired staff. The meeting should include sign-in sheets.
21
Work Flow and Operational Efficiencies
Recommendation
1. Train the facilities technician in construction to use the Colbi Technologies system, as
needed.
Status: In Progress
The new director, assistant director, fiscal services employee and the two facilities consultants have
attended at least one of the two annual Colbi workshops. In light of the district’s decision to have both
facilities technicians work with Colbi, both facilities technicians should attend both Colbi workshops
each year to keep up with the system, get questions answered, work on system customization for the
district, and network with colleagues. With one of the positions becoming vacant, it should be filled with
a person who is either already proficient or is willing to learn the system within a time limit. This should
be a requirement of the position.
Recommendation
2. Establish and maintain regular communications among Colbi Technologies consul-
tants, the facilities technician and the district’s Accounting Department for processing
and tracking budget development and account code assignment, budget transfers, and
budget/expenditure reporting.
Status: In Progress
Fiscal Services staff are now included in training on the Colbi accounting system.
The Colbi system is still only used for bond projects and not for every project, reportedly because of the
cost of the system. Excel spreadsheets continue to be used for nonbond projects. All projects’ budgets and
expenditures should be tracked using the Colbi system for consistent and detailed reporting by cost cate-
gory. The director is encouraged to review the Colbi contract, including the fee structure, and to consider
renegotiating the contract and fee provisions so smaller projects can be included.
Recommendation
3. Reconcile the Colbi system with the district’s accounting system annually, including
becoming current with the past two years to produce accurate and up-to-date project
budget/expenditure reports.
Status: Implemented
Staff reports that reconciliation has been completed to June 2015. Inclusion of the Fiscal Services staff in
Colbi training should continue to strengthen the budget and expenditure reporting and reconciliation
processes. Inclusion of the Fiscal Services staff at Citizens’ Oversight Committee meetings should also
continue.
Recommendation
4. With the help of Colbi Technologies, ensure that a Colbi system user manual is devel-
oped, maintained and readily available on the desk of the facilities technician.
22
Status: Partially Implemented
Both facilities technicians have the physical Colbi manual, but online research was not done by both
technicians because of a lack of comfort with the online version and its index. Training should continue
and staff should be encouraged to ask questions to become proficient in the Colbi system.
Recommendation
5. Continue to ensure that the administrative flowchart of activities for various contract,
budget development and transfer, and payment functions is followed.
Status: Partially Implemented
With new staff coming into the department, many changes in processes and procedures are just now
occurring. These need to be communicated and instituted with the staff through adequate training, docu-
mentation and monitoring through staff evaluations and meetings. Any administrative flowchart needs to
be documented and included in an employee handbook and best practices departmental guidebook.
In addition to Colbi administrative flowcharts, the staff now has a sample handbook, with documents
being added to it, including agreements, sample letters, sample memos, purchase orders, requisitions,
sample bid documents, Office of Public School Construction reports and general conditions language.
This sample handbook resides on the bookshelf and is kept up-to-date by the facilities technicians.
Electronic files should be kept up-to-date and in accessible subdirectories on the department and district
data network.
Weekly facilities departmental meetings have been instituted, and these meetings should occur con-
sistently. The assistant director facilitates the meetings using a large whiteboard listing tasks, activities
and issues that are imminent. These are written as the thoughts are brought up, not in project or other
order. They are discussed, assigned to an employee or other person and given a priority number from
1-4 according to the week they are due. As priorities are discussed, they are deleted when completed,
reprioritized as needed, and others are added. When reviewed by FCMAT, the whiteboard was filled with
48 items not in project, priority or chronological order. The facilities technician then photographs it and
emails it to staff members. Because the list is not organized, this method may not be optimal in helping
to plan department and staff workload, and staff may want to consider facilitating the meetings in a more
organized way.
Recommendation
6. Review and revise the architect agreement to incorporate stronger terms and pro-
visions to protect the district, especially in requiring the architect to follow district
design standards.
Status: In Progress
Staff acknowledged that previous architect/engineering professional services agreements did not ade-
quately protect the district. Staff reported that on previously approved agreements, the architect was
allowed to have their own agreement language supersede the district’s agreement. Staff are revising the
A/E agreement to conform with legal requirements and to adequately protect the district by requiring use
of district facility standards. FCMAT did not receive a copy of the current A/E draft agreements.
23
Recommendation
7. Continue to enforce completion of all DSA and district closeout requirements before
making the final payment to the general contractor.
Status: In Progress
The contracted construction manager is spearheading the DSA and district closeout procedures, and this
is under way.
Vendor payment due diligence, including for contractors and for professional services, has been
improved. Previously, invoice review was sometimes cursory, and facilities technicians were not empow-
ered to deny or question invoices. The assistant director has now provided the facilities technicians with
criteria for invoice due diligence.
Payment requests from general contractors are now done with a two-step process using email, with a
pre-review of the draft payment application submitted by the contractor without signatures. If errors or
questions are found, these are resolved prior to the time-consuming process of gathering the multiple
required signatures.
Payment requests by other vendors are now reviewed by the appropriate team members, and they
have been encouraged to deny or ask questions of vendors instead of signing off without adequate due
diligence. “Not Approved” and date stamps are used, and denied payment requests are returned to the
vendors in a timelier manner than previously. Staff determine whether the work or services were actually
performed and whether the request is within the purchase order and contract.
Recommendation
8. Enforce completion of all DSA and district closeout requirements before making the
final payment to the architect/engineering firm for all projects.
Status: In Progress
Staff acknowledged that this was not consistently enforced on every A/E agreement previously and that
both the contracted construction manager and the assistant director now perform due diligence on
invoices and send them back for resubmittal when necessary. Staff reported that facilities technicians pre-
viously may not have been adequately trained and encouraged to review invoices for all payment criteria,
and that this needs to occur in the future.
Recommendation
9. Ensure architect adherence with district design standards and inclusion of those stan-
dards into the plans and specifications of all projects, from initial architect agreement
through design, construction administration and closeout.
Status: In Progress
As part of the Facilities Master Plan update under way, district facility standards are to be updated with
input from Maintenance, Technology and Facilities departments, and from the design and planning
teams. The District Standards document should be approved by the governing board to be enforceable
and included into the A/E agreement. Staff stated that with the update of the Facilities Master Plan and
the revision of the A/E agreement template, as well as stronger due diligence processes by the construc-
tion manager, facilities technicians and assistant director, this recommendation will be on its way to being
implemented.
24
Recommendation
10. Ensure project inspectors are knowledgeable about the new DSA procedures and have
the necessary software and computer technology before contracting with them.
Status: In Progress
Staff reported that the selection process for project inspectors will include a requirement that the inspec-
tor is experienced with the new DSAbox closeout procedures for current projects. The box closeout
activities should be included in weekly construction meetings and be discussed as needed in facilities staff
meetings.
Recommendation
11. The contracted construction managers and not the supervisor of construction should
manage the architect.
Status: Implemented (using Assistant Director)
The job description for the new assistant director position includes management of construction activ-
ities. The current employee is an architect and thus has extensive experience in the A/E area. The focus
is on organization of the plan room, architect selection and contract template development along with
Facilities Master Plan update activities. The job description includes a very broad level of facilities plan-
ning activities including site approvals and development, compliance with the California Environmental
Quality Act, development and maintenance of short- and long-term enrollment projections, developer
fee agreements, boundaries, funding, and State School Facilities Program applications, among other
responsibilities. This position should provide adequate attention to these other non-architect activities as
needed.
Chain of Command
Recommendation
1. Develop and enforce the chain of command for communications by staff.
Status: In Progress
Staff reported to FCMAT that the OPRA work order system is now to be used for all facility requests and
maintenance repair requests, including smaller capital projects and volunteer projects, as well as larger
capital project proposals. The Facilities Department reports that this new system has not been fully used
for any facilities project as of the time of the FCMAT follow-up report, so it is unknown whether this
will be adequately implemented.
Recommendation
2. Ensure that the chain of command is followed and responsibilities for construction
projects are channeled through the project team.
Status: In Progress
The OPRA work order system has been in place just since summer 2015. Staff was aware of the intent of
the new system in some respects. It will be important for everyone on the project team to be adequately
trained and encouraged to ask questions if there are problems and as the system issues are worked out.
25
The new Henry Playground project should be used as a pilot project for the new processes and proce-
dures including how to handle change requests from both the project team and those outside the project
team, including board members and community members. The construction manager should be ade-
quately trained to communicate processes to the project team and should be empowered to communicate
issues in a timely manner to the assistant director and director.
Recommendation
3. Plan and design construction projects collaboratively with input from various sources,
including Maintenance Department staff, site users, facilities staff, and technology
staff. A process should be used for decision-making and follow-through on explana-
tions of why decisions have been made on scope, budget, and other areas so that staff
and those affected are a part of the process throughout.
Status: Implemented
Regular planning and design meetings, including input from various sources, are occurring on currently
planned projects. These processes should be documented in employee handbooks and the facilities best
practices guide.
Recommendation
4. Develop and enforce a chain of command through the contracted construction man-
agers and project team for any requested changes in the scope or design of the projects
once construction has begun.
Status: In Progress
At the time of the FCMAT follow-up report, staff reported that the next large project will be the Henry
Playground. This should serve as a pilot project for the new processes and procedures for change requests.
Recommendation
5. Continue to educate the governing board on the importance of using the chain of
command so that bond funds and other capital outlay funds can be utilized effi-
ciently.
Status: Not Implemented
It was not reported that governing board members or community members have been educated on either
the OPRA work order system or how board members’ requests will now be processed. Board members
should be made aware of the importance of their role and the need for them to follow the system for suc-
cessful facilities program operations. Regular presentations keep the board informed about projects and
the program, and a joint presentation from Maintenance, Facilities, Technology and Fiscal Services would
be beneficial.
Potential Energy Manager Position
Recommendation
1. Consider adding a full-time energy manager position to the Facilities/Construction
Department. This position should have the technical/mechanical skills required to
develop and implement the Proposition 39 energy program and, if the energy man-
26
ager does not have the skills, to oversee an outside contracted energy consultant to
ensure compliance with all Proposition 39 requirements. This position could be com-
bined with that of a low-voltage technician to offer economy of labor, and the savings
used to fund the position.
Status: Implemented
A senior energy resource manager (SERM) position was created, and was filled in August 2015. This
employee was hired with reported energy management experience and knowledge of the Proposition 39
energy program and how to implement it. The job description describes a broad level of responsibility for
improving energy efficiency and conservation through policies, strategies, programs, standards and mea-
sures. The employee is focused on developing current facility baseline energy usages and is very involved
in introducing the school site users (including students, teaching and non-teaching staff, administrators,
and custodians) to his position and the existence and creation of a district energy program.
Recommendation
2. Require the energy manager to have the skill and be responsible for maintaining the
energy-efficient, cost-effective and operational functioning of the EMS, BMS and
other district energy systems.
Status: Implemented
The SERM job description includes the operation of the computerized Energy Management Systems in
the existing facilities, establishing effective standards and procedures for the operation of HVAC systems,
and evaluation and monitoring programs.
Recommendation
3. Assign the energy manager position to assist the facilities director in developing,
updating and implementing an overall energy plan in the district using the current
energy savings plan summary dated August 23, 2013.
Status: In Progress
The SERM reports directly to the assistant superintendent for business but works out of the Facilities and
Maintenance Department location. The SERM is working on assessing existing conditions at facilities,
reviewing utilities bills and costs, getting to know the district and site staff, reviewing what energy mea-
sures and renovations have already taken place, communicating with the utility providers, and hearing
ideas for energy conservation from site custodians, teachers and site staff. He is focused on energy con-
servation and on reviewing the operations of HVAC equipment and the Energy Management Systems
already in place.
The SERM has submitted draft reports and plans for the assistant superintendent to review, with goals,
timelines and criteria for success for each category. He provides verbal reports at the semi-weekly depart-
mental meetings.
27
Recommendation
4. Exercise caution if adding the energy manager position as an employee because of the
lack of guaranteed funding for the entire five years of the Proposition 39 program.
Status: Not Implemented
There was no evidence that this position is for a limited time only because of the five-year funding time-
line. There was no requirement of guaranteed energy savings to fund the position and program in the job
description.
The governing board and district administration will need to stay committed to the program to keep it
funded past the Proposition 39 five-year duration (or if it is defunded earlier than five years). Typically,
during any future tight budget years, energy savings will need to be shown to justify the position, unless
there are other incentives or penalties from regulatory agencies or the state to school districts.
Recommendation
5. Assign the director of facilities/construction to meet application deadlines, submitting
applications and ensuring compliance with all the monitoring, reporting and auditing
requirements of the Proposition 39 program.
Status: In Progress
Implementation of the Proposition 39 energy program is the responsibility of the SERM, under the
direction of the assistant superintendent. He is reviewing the energy audits done previously by outside
firms for the district in 2014. He is comparing the current conditions with the 2014 energy audit to
update it for any energy measures already taken.
He is reviewing past energy plans and recommendations with department chairs and plans to get input
from the Facilities, Maintenance and Business departments and update the Proposition 39 recommen-
dations. He anticipates that he will change some of the recommendations of the 2014 energy audit, and
plans to work on the Proposition 39 Energy Expenditure Plan within the first 12 months of being hired.
The assistant director of facilities should include the SERM in the Facilities Master Plan update early in
the process. Energy efficiency may be included as a separate section in the plan, as well as being included
in the District Facilities Standards document included in the Master Plan. The SERM should work with
the Facilities Department to standardize the construction standards and fixtures. He has not yet been able
to start on this task, but will need to review the district’s existing standards and work with the Facilities
Department on energy standards for new schools, including lighting, natural lighting and site configura-
tion, toilet fixtures and other areas where energy efficiency is involved.
28
Staffing Comparisons
Recommendation
1. Identify and budget an amount needed annually to adequately maintain the district’s
grounds and facilities.
Status: In Progress
The supervisor of maintenance and operations is taking inventory and evaluating the condition of the
department’s equipment and vehicles. This is the first step in establishing a budget for maintaining the
district’s grounds and facilities.
Summary
The board, superintendent and district staff have taken immediate action and have been diligent in
responding to the findings and recommendations contained in the FCMAT report dated February 2014.
The district will need to continue to fully implement many of the recommendations already in progress.
On behalf of FCMAT, we appreciate the opportunity to serve you and extend our thanks to all the staff
of the Anaheim City School District.
Sincerely,
Eric D. Smith
Fiscal Intervention Specialist
C: David A. Rivera, Assistant Superintendent
29