FCMAT
Burlingame School District Report
technology department and program review
Read the report at Burlingame School District ↗
Burlingame School District
Technology Review
June 7, 2012
Joel D. Montero
Chief Executive Officer
Fiscal crisis & ManageMent assistance teaM
June 7, 2012
Maggie MacIsaac, Ed.D., Superintendent
Burlingame School District
1825 Trousdale Drive
Burlingame, CA 94010
Dear Superintendent McIsaac,
In December 2011, the Burlingame School District and the Fiscal Crisis and Management Assistance Team
(FCMAT) entered into an agreement for a review of the district’s technology operations. Specifically, the
agreement stated that FCMAT would perform the following:
1. Review the district’s organizational structure for technology support services and
make recommendations for improvement.
2. Review the district’s staffing for technology support services and make recommen-
dations for improvement.
3. Review the district’s delivery of administrative technology support services and
make recommendations for improvement.
4. Review the district’s delivery of instructional technology support services and make
recommendations for improvement.
5. Conduct an end-to-end network discovery audit to fully document the district’s
network and identify network elements for replacement/upgrade.
6. Based on the output of the network discovery audit, provide recommendations
regarding cabling that needs to be replaced or installed to improve network reli-
ability and performance.
7. Based on the output of the network discovery audit, provide recommendations
regarding network elements that need to be replaced, upgraded, and/or installed to
improve network reliability and performance.
FCMAT
Joel D. Montero, Chief Executive Officer
. .
1300 17th Street - CITY CENTRE, Bakersfield, CA 93
.
301-4533 Telephone 661-6
.
36-4611 Fax 661-63
.
6-4647
422 Petaluma Blvd North, Suite. C, Petaluma, CA 94952 Telephone: 707-775-2850 Fax: 707-775-2854 www.fcmat.org
Administrative Agent: Christine L. Frazier - Office of Kern County Superintendent of Schools
8. Based on the output of the network discovery audit, create a new wide area
network (WAN) design that improves network reliability and performance.
These documents shall include a map and description of recommended
backbone elements, maps and descriptions of recommended network elements
for each site local area network (LAN), and recommended network element
configurations.
This final report contains the study team’s findings and recommendations in the above areas of
review. We appreciate the opportunity to serve the Burlingame School District, and extend our
thanks to all the staff for their assistance during fieldwork.
Sincerely,
Joel D. Montero
Chief Executive Officer
i
Table of conT enT s
Table of contents
About FCMAT .........................................................................................iii
Introduction ............................................................................................1
Background ......................................................................................................1
Study Guidelines ............................................................................................1
Study Team.......................................................................................................2
Executive Summary ........................................................................3
Findings and Recommendations .....................................................5
Network Infrastructure and Administration .........................................5
Technician Support Services ....................................................................13
Instructional Technology ...........................................................................17
Management, Staffing and Communications ....................................21
Network Discovery Audit ..........................................................................25
Appendices ............................................................................................37
BurlingaMe school District
ii
Fiscal crisis & ManageMent assistance teaM
iii
abouT fcM aT
About FCMAT
FCMAT’s primary mission is to assist California’s local K-14 educational agencies to identify,
prevent, and resolve financial and data management challenges. FCMAT provides fiscal and
data management assistance, professional development training, product development and other
related school business and data services. FCMAT’s fiscal and management assistance services
are used not just to help avert fiscal crisis, but to promote sound financial practices and efficient
operations. FCMAT’s data management services are used to help local educational agencies
(LEAs) meet state reporting responsibilities, improve data quality, and share information.
FCMAT may be requested to provide fiscal crisis or management assistance by a school district,
charter school, community college, county office of education, the state Superintendent of Public
Instruction, or the Legislature.
When a request or assignment is received, FCMAT assembles a study team that works closely
with the local education agency to define the scope of work, conduct on-site fieldwork and
provide a written report with findings and recommendations to help resolve issues, overcome
challenges and plan for the future.
Studies by Fiscal Year
90
80
70
60
50
40
30
20
10
0
92/93 93/94 94/95 95/96 96/97 97/98 98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11* 10/11**
*Projected
**Actual
BurlingaMe school District
seidutS
fo
rebmuN
FCMAT also develops and provides numerous publications, software tools, workshops and
professional development opportunities to help local educational agencies operate more effec-
tively and fulfill their fiscal oversight and data management responsibilities. The California
School Information Services (CSIS) arm of FCMAT assists the California Department of
Education with the implementation of the California Longitudinal Pupil Achievement Data
System (CALPADS) and also maintains DataGate, the FCMAT/CSIS software LEAs use for
CSIS services. FCMAT was created by Assembly Bill 1200 in 1992 to assist LEAs to meet and
sustain their financial obligations. Assembly Bill 107 in 1997 charged FCMAT with responsi-
bility for CSIS and its statewide data management work. Assembly Bill 1115 in 1999 codified
CSIS’ mission.
AB 1200 is also a statewide plan for county office of education and school districts to work
together locally to improve fiscal procedures and accountability standards. Assembly Bill 2756
(2004) provides specific responsibilities to FCMAT with regard to districts that have received
emergency state loans.
iv
abouT fcM aT
In January 2006, SB 430 (charter schools) and AB 1366 (community colleges) became law and
expanded FCMAT’s services to those types of LEAs.
Since 1992, FCMAT has been engaged to perform nearly 850 reviews for LEAs, including school
districts, county offices of education, charter schools and community colleges. The Kern County
Superintendent of Schools is the administrative agent for FCMAT. The team is led by Joel D.
Montero, Chief Executive Officer, with funding derived through appropriations in the state
budget and a modest fee schedule for charges to requesting agencies.
Fiscal crisis & ManageMent assistance teaM
1
inTroduc Tion
Introduction
Background
Located in the North Bay region of the San Francisco Bay Area, the Burlingame School District
serves approximately 2,900 students at five elementary schools and one middle school. With
continued growth of Burlingame’s student population over the last five years, just short of 20%,
and additional projected growth of approximately 5% over the next four years, the district looks
forward to the construction of a seventh campus.
The district enjoys the support of numerous volunteers committed to enhancing the educational
opportunities of the district’s students. Through the Burlingame Community Educational
Foundation, parents and community members are committed to raising considerable money and
volunteering countless hours as a dedicated effort to support the district’s educational programs.
Individuals also enrich the learning environment by volunteering in classrooms.
Study Guidelines
The Burlingame School District contracted with the Fiscal Crisis and Management Assistance
Team (FCMAT) in December 2011 to conduct a review of the district’s operations related to
technology. Specifically, the study agreement states that FCMAT will complete the following:
1. Review the district’s organizational structure for technology support services
and make recommendations for improvement.
2. Review the district’s staffing for technology support services and make recom-
mendations for improvement.
3. Review the district’s delivery of administrative technology support services
and make recommendations for improvement.
4. Review the district’s delivery of instructional technology support services and
make recommendations for improvement.
5. Conduct an end-to-end network discovery audit to fully document the
district’s network and identify network elements for replacement/upgrade.
6. Based on the output of the network discovery audit, provide recommenda-
tions regarding cabling that needs to be replaced or installed to improve
network reliability and performance.
7. Based on the output of the network discovery audit, provide recommenda-
tions regarding network elements that need to be replaced, upgraded, and/or
installed to improved network reliability and performance.
8. Based on the output of the network discovery audit, create a new WAN
design that improves network reliability and performance. These documents
shall include a map and description of recommended backbone elements,
maps and descriptions of recommended network elements for each site LAN,
and recommended network element configurations.
BurlingaMe school District
2
inTroduc Tion
FCMAT visited the district on March 6-7, 2012 to interview employees and collect data. During
this visit, team members also toured the McKinley, Washington, and Roosevelt elementary school
sites, and the Burlingame Intermediate School site. Prior to the team’s visit, a network discovery
audit of the district’s technology infrastructure was conducted from February 21-24, 2012. This
report is the result of those activities.
Study Team
The study team was composed of the following members:
Marisa Ploog, CPA Mike Vincelli*
FCMAT Fiscal Intervention Specialist Director of Technology
Bakersfield, CA Shasta Union High School District
Redding, CA
Robert Black* Laura Haywood
FCMAT Consultant FCMAT Technical Writer
Bakersfield, CA Bakersfield, CA
Fiscal crisis & ManageMent assistance teaM
3
execuTive suMMary
Executive Summary
Most school districts are challenged by the rapid changes in technology use and support, and the
Burlingame School District is not an exception. As reliance on advanced technology increases, so
do demands on the resources required to implement, support, maintain and replace these tools.
Effective implementation of technology requires a strong, well-structured technology department
that is sufficiently experienced to support the district’s operations and the integration of tech-
nology into the classroom as a means for maximizing the district’s academic programs.
The district’s technology services department performs a wide range of technology-related
duties but struggles to fully support the district’s technology infrastructure. The staff has
limited experience and technical training, and the department lacks an experienced technology
leader. Ineffective communications also contribute to the district’s inability to implement,
use and support technology. Operational issues that affect the district and sites are not well
communicated between technology staff, site staff and district administration. The lack of a
formally trained technology leadership position has hampered the district’s capacity to establish
a well-designed technology department that can guide, implement and support the technologies
required for daily operations and classroom instruction. The lack of a clear and formal leadership
structure also impedes implementation of the district’s vision for technology. The district should
hire a formally trained leader to direct a collaborative team that supports the district’s curriculum
and technology integration needs. Mandates such as common core assessments and the need to
provide students, staff and community members with access to network resources make tech-
nology services a vital contributor to district operations.
The district network infrastructure is not documented. Network documentation is necessary to
successfully manage network operations, enabling technicians and outside vendors to effectively
troubleshoot network issues in a timely manner. The district should develop detailed network
documentation and ensure that it is routinely reviewed and updated.
An audit of the cabling infrastructure at each site identified deficiencies throughout the district
including the lack of secured locations for network equipment with adequate environmental
controls; poor planning and workmanship on installation of cabling and patch panels; disorga-
nized equipment racks; lack of network documentation and labeling; inconsistent configurations
of the district’s network infrastructure devices and insufficient security controls on network
routers and switches.
Technology advances in the classroom present technology staff with challenges related to acquisi-
tion, configuration, implementation and support. Campus modernization projects completed
without well-developed strategic plans for implementation and the lack of experience among
technical staff to support the updated technology infrastructure have left the district with costly
infrastructure and equipment that is underutilized or not utilized at all.
The district should develop, update and clearly communicate a comprehensive plan that defines
the parameters for technology use in all areas, from administrative operations to the classroom.
Each area and its environment should be thoroughly reviewed before technology is acquired
or implemented for it. The potential benefits of any proposed equipment, software or delivery
system and the potential demands that it may impose on the district’s current and future
resources should be carefully considered.
District staff members frequently commented on performance issues of the technology utilized in
the work environment and classroom. The speed of classroom technology was among the issues
BurlingaMe school District
4
execuTive suMMary
experienced by school site staff. FCMAT’s research into the contributing factors associated with
network speed identified several deficiencies, including:
• Network server and other switch communication issues
• Poorly constructed network structures
• Improper and inconsistent network and computer configurations
The district does not have centralized formal backup, which leaves it at risk of data loss in the
event of hard drive crashes, disasters or virus attacks. District staff shared that there is no central-
ized network location for staff members to save their work, so staff save data to their local disc
drives on individual computers. Some staff stated that they back up their data to external devices;
however, this is not a district-wide practice. The lack of a formal data recovery plan will make it
difficult for technology staff to restore data in a timely fashion. The district should develop and
implement a centralized backup system to uniformly back up and store data in an offsite loca-
tion. This plan should identify all systems utilized by the district that record and/or document
critical data.
Many staff expressed frustration with email communications. Although spam filtering is neces-
sary to prevent undesirable junk email from delivery, the district’s settings block many essential
emails from parents and also block common educational resources such as the California
Department of Education. District technicians are not sufficiently knowledgeable in managing
the application and thus rely on software default settings to manage email delivery. The district
should work with the software provider to modify spam filter settings to ensure valid email
communications reach their destinations. Training should also be sought for district technicians
to ensure they can manage the systems settings.
The district lacks professional development for both technology users and support staff. The
district should assess the skills and abilities of each technician and determine the professional
development necessary to ensure they can support the district’s technology and instructional
software and equipment. Technicians should also be adequately trained to support any new
equipment and software that is implemented. Instructional staff should be provided training on
all technology equipment in the classroom setting to ensure its effective incorporation into the
instructional program.
Fiscal crisis & ManageMent assistance teaM
5
neTW orK infras TrucTure and ad MinisTraTion
Findings and Recommendations
Network Infrastructure and Administration
The district’s network infrastructure is not documented and has been built without formal plan-
ning and design focused on current and future needs. Accurate network documentation is critical
to successfully manage any production network and ensure that district technicians or outside
vendors can troubleshoot network issues quickly and efficiently. The documentation needs to be
reviewed for accuracy and updated regularly. The district network does not include a manage-
ment system that would provide continuous automated measurement of the network’s perfor-
mance and automated collection and notification of critical network events. Documentation
should include switching and routing documentation, server documentation, IP addressing, time
sync, passwords, firewall, phone system, wireless, and backup systems.
FCMAT’s network discovery audit of the district’s network is contained in Appendix E.
Network Configuration
Teachers and staff have little or no online accessible storage to retain data and therefore save files
on their local drive. This limits accessibility to these files to a single computer. Storing files on
local drives also limits the ability for effective data backup and recovery. Efficient replacement
of computers also becomes much more difficult when data is stored on individual computers
because the data must be identified and transferred from the old computer to the new computer.
Another risk to local storage presents itself if a computer is stolen or the hard drive crashes. In
these events any user data is lost and will not be recoverable. Local storage also prevents staff
from accessing their files from another district location.
A new server network that incorporates virtualization would allow many servers to operate
on one physical piece of hardware, greatly reducing hardware costs. One option would be to
centrally locate all servers at the Burlingame Intermediate School, with new fast wide area
network (WAN) lines to each school site. Centrally locating servers simplifies network mainte-
nance, service, and backup. A new server network with a district-wide Active Directory structure
would allow staff and students with individual logins to access mapped drive storage that would
be secure and backed up. A sample Active Directory structure is provided in Appendix A. A
centralized server network also provides students and teachers access to their files when they
move from site to site, reducing the need for ancillary devices such as USB drives. Although the
district utilizes both Apple and PC products, Active Directory can be utilized for Apple products
for network authentication and access to shared server storage and user storage with Windows
server 2008R2. Shared storage would allow teachers from each site to share Smart Board files
and lesson plans. It also would be possible to extend the district’s Cisco wireless authentication to
groups and students, giving the technology department and district easier, more effective control
of wireless access to network resources.
System Backup
Interviews with staff revealed that the district has no formal and only some informal backup
procedures to recover lost data from hard drive crashes, disasters or virus attacks. This subjects
the district to substantial risk of data loss. The absence of a data recovery plan will make it diffi-
cult to restore data or, in the case of a complete server failure, to restore data in a timely fashion.
BurlingaMe school District
6
neTW orK infras TrucTure and ad MinisTraTion
The district should develop and implement centralized backup for all systems that is stored in an
offsite location.
A disk-to-disk backup also is necessary to safeguard critical hard drives and servers. Centralized
backup would be best because the district is upgrading WAN lines between sites to 100 MB this
summer. With the faster WAN speed it would be possible to back up the entire district at night
to a centralized location such as Burlingame Intermediate School. Software such as BackupExec
or EMC Networker verifies the integrity of the data being backed up, catalogs the data, and
allows quick data recovery. It is a best practice to assign an employee to place the backups in a
district safe or bank safety deposit box.
A comprehensive disaster recovery plan identifies all systems that record and/or document critical
data. Examples of major technology applications are Internet access, accounting systems, student
information systems and email systems. Best practice is to back up all critical systems daily and
store the backups offsite in a fireproof location.
Recommendations
The district should:
1. Develop detailed network documentation.
2. Design a new server network that incorporates virtualization.
3. Develop and implement a centralized backup for all systems, with storage in
an offsite location.
4. Develop and implement a backup system to safeguard critical hard drives and
servers.
5. Develop a disaster recovery plan.
Technology Environment
Many of the wiring closets inspected had inadequate ventilation and/or cooling infrastructure.
The heat buildup in these rooms could damage equipment. District wiring closets need proper
operational cooling, ventilation and uninterruptible power supplies to ensure the equipment
is properly safeguarded against interruption of electrical services, environmental threats and
overheating. It is essential for the temperature in these rooms to be maintained between 68-73
degrees. During modernization these rooms need to be on separate small air conditioning systems
to ensure they are not turned off during summer months.
Circuits for network closets need to be isolated and dedicated to network equipment, with
proper ventilation and cooling to prevent equipment from becoming damaged. Electrical outlets
accessible to the same circuit should be controlled to ensure unnecessary devices are not accessing
power from these sources.
Fiscal crisis & ManageMent assistance teaM
7
neTW orK infras TrucTure and ad MinisTraTion
Recommendations
The district should:
1. Inspect network closets and ensure that circuits are isolated and dedicated to
network equipment, with proper ventilation and cooling to prevent equip-
ment from becoming damaged.
Technology Plan
School districts develop five-year technology plans to describe their use of educational technology
and to outline the strategic goals for its distribution and use. The plan focuses on the use of
technology to support the curriculum and delineates the objectives and strategies for classroom
technology, individual student technology, technology required to support school and division
operations, and the technology infrastructure. A good technology plan should be grounded in
instruction and also includes elements to advance operational efficiency. FCMAT reviewed the
district’s technology plan for the period of 2008-2013.
The current technology staff did not help develop the current technology plan and were not
familiar with its content. The technology plan reviewed did not contain any reference to network
design or data safeguard systems in the event of a catastrophic event or security breach. A written
plan for system and data recovery is essential in case systems experience catastrophic infrastruc-
ture failure, natural disaster, and/or security breaches. The following steps should be taken:
1. Network documentation is needed throughout the network.
2. Document electrical power and air conditioning needs.
3. Create a plan for data backup that includes a backup once every 24 hours
both locally and to off-site storage, snapshots for virtual servers four times a
day, and monthly backup to be stored in a district safe or bank safety deposit
box.
4. Once a year, restore all data from a remote backup to a system that allows
comparison and a quality check of the backup. Document and make changes
as needed.
The district’s documented long-range plans for infrastructure, hardware and software are insuf-
ficient. The staff members’ lack of technical experience, their isolation from each other on
separate campuses and from the staff members responsible for directing the needs of technology
significantly handicap the district in supporting technology efforts.
Technology standards for all areas of general operation and school sites should cover the district-
wide infrastructure, hardware and software for classrooms and labs. This will help to ensure
consistency and equity district-wide and enable technology staff to provide quality, timely
support. Financial resources should be identified and allocated and a long-range plan developed
to ensure that maintenance and replacement needs can be met. Standards should include state-
ments that detail what hardware, operating systems, and software is supported and for how long.
BurlingaMe school District
8
neTW orK infras TrucTure and ad MinisTraTion
Recommendations
The district should:
1. Update the technology plan to include procedures for data recovery in the
event of catastrophic infrastructure failure, natural disaster and/or security
breaches.
2. Develop technology standards for all areas of general operation and school
sites.
3. Develop standards based on network equipment capable of handling large
school network needs, and avoid technology such as home/office network
equipment that is not sufficient to handle these needs.
Hardware and Software
Technicians do not understand the district’s purchasing system, how to obtain parts to maintain
and repair equipment, or how to charge for these items. Coordinating purchases and using
approved vendors could maximize purchasing discounts. Approved vendor lists for each type
of acquisition should be based on pricing, availability, support and other purchasing attributes.
Technicians need proper training regarding the district’s established purchasing process so they
can order the items necessary to complete routine equipment maintenance.
The district lacks standard operational policies and procedures for technology acquisitions.
Each school site purchases hardware and software without formal standards to guide them. No
preventive maintenance or replacement policies exist for operations or programs that depend on
technology. Hardware is replaced by school sites when it fails or becomes too old to be effective.
Because most technology acquisition and supplemental support comes from individual site
budgets, there is a great disparity in equipment type and configurations among campuses.
The district lacks an adequate replacement plan for its technology assets, including its network
infrastructure. Although the district continues to expand its use of technology in the classroom,
staff reported that no documented equipment replacement plan exists. Standards also are needed
for networking equipment, including switches, access points, and wiring.
The district does not provide sites with a list of standardized technology equipment that may
be acquired. Such a list would include specifications for the most common types of equipment
including teacher laptop computer, teacher desktop computer, district office desktop computer,
student computer, classroom printer, etc. Each item specified would be evaluated for quality, the
ability to function in the district’s network environment, ease of configuration and ability of the
technology staff to support it.
A standardized list of common devices can help reduce the time necessary to research and
consider each individual purchase requisition. Technology support staff can more easily be
trained to configure and support standardized equipment and software.
Although a standardized list of equipment and software can greatly increase efficiencies in
purchasing, distribution and support, less common equipment and software requests still need to
be considered. When these requests are made, the technology department should be responsible
for researching and specifying equipment that is compatible with the district and site infra-
structure. Each request also should consider whether the technical ability of staff is sufficient to
support the device.
Fiscal crisis & ManageMent assistance teaM
9
neTW orK infras TrucTure and ad MinisTraTion
Software is typically purchased with little or no review by the technology services department.
The lack of an established software adoption policy and purchasing standards contributes to
difficulties in support and system management and results in unsustainable technologies. School
site staff need assistance in researching software to determine whether it is compatible with the
existing hardware. Software should be standardized as much as possible to keep training costs to
a minimum and to obtain the best pricing. Technology and curriculum staff should collaborate
on a standard list of software to ensure instructional needs are met. Campuses may utilize varying
software applications, but all applications should be reviewed to identify the minimum system
requirements necessary to run the software, configuration needs, and the level of support that
will be required. Licensing requirements, renewal costs, and the tracking of software inventory
and licenses also should be reviewed.
The district does not maintain a software inventory. Many applications limit the number of
devices an application may be installed on or accessed at any given time, so the acquisition and
installation of software should be tracked district-wide. Measures should be in place to account
for software licenses and control installations to ensure compliance with all limitations.
Configurations
The district has not established nor documented standards for system hardware and software
configurations, including standard desktop configurations. Three to four configurations should
be established for each device. Standard printer configurations should also be defined and
utilized. All new technology acquisitions should be received, configured and installed by the
technology services department to ensure district-wide standardization.
Recommendations
The district should:
1. Establish standardized technology purchasing practices.
2. Establish an approved vendor list for each type of acquisition based on
pricing, availability, support and other purchasing attributes.
3. Ensure that technicians are properly trained in the purchasing process and
how to order materials needed for routine equipment maintenance.
4. Establish a list of standardized technology equipment that sites may acquire.
5. Assign the technology department to research and specify equipment models
to ensure that acquisitions are compatible with the district’s infrastructure.
6. Establish measures to account for software licenses and control installations.
7. Ensure that the technology services department receives, configures and
installs all new technology acquisitions.
Email
The district uses a cross-platform email software package, Kerio Connect, as its primary email
tool, and four different email retrieval/reading platforms for accessing email: Kerio, Outlook,
BurlingaMe school District
10
neTW orK infras TrucTure and ad MinisTraTion
Apple Mail, and Entourage. Supporting four platforms makes troubleshooting, training,
maintenance and help desk operations difficult. Many staff members complained of slow email
performance and difficulties with archiving or easily deleting old emails.
New email systems have integrated email retrieval options. One such platform is Microsoft
Exchange server with Outlook. Outlook is supported on both Mac and PC computers and has
the same look and feel on both platforms. A single integrated email retrieval platform makes it
easier for technicians to maintain and support the email system. While running an Exchange
2010 server can be complex, it is possible to contract for hosted Exchange server services from
Microsoft directly or from other vendors. With hosted email services all backup, archive, and
spam filtering can be included as a service and maintained by the vendor.
Several mentions were made during staff interviews that the district email spam filter blocks most
emails from parents, the CDE and other important sources. During FCMAT’s fieldwork, some
emails from FCMAT team members were also blocked because the spam filter settings were too
restrictive (see message below). Staff reported during interviews that the aggressive settings on
the district’s spam filter have caused important CDE emails concerning CALPADS and other
operational issues to be missed. While the spam is placed in a user accessible spam folder, the
users must sift through these emails and identify each email that they want white-listed, which
allows future emails to be delivered into the user’s email box. This can be very time consuming.
The following is an example of the delivery failure notice automatically returned to the sender
when an email is blocked through the SPAM filter:
Could not be delivered because of
Server refused mail at END OF DATA - 550 Requested action not taken:
email being blocked by BSD Spam Mail Blocker
The following recipients were affected:
gcosta@bsd.k12.ca.us
The LightSpeed spam filtering box is a quality product that many school districts utilize for
spam filtering. While filtering is necessary to prevent undesirable junk email from delivery, the
settings that control the level of blocking should allow legitimate email to be received. District
technology staff stated they do not have the knowledge or experience necessary to modify the
application settings for email delivery; they simply use the maximum default settings.
Recommendations
The district should:
1. Explore new email system options that have integrated email retrieval plat-
forms.
2. Work with the software vendor to properly modify filter settings to allow
school and site business emails to reach their destination.
3. Thoroughly train district technology staff to manage spam filter system
settings.
Fiscal crisis & ManageMent assistance teaM
11
neTW orK infras TrucTure and ad MinisTraTion
IP Video
During site modernization new IP video systems were installed at two schools. IP video systems
allow for the distribution of TV and video through the IP network to classrooms and teachers’
PCs. These systems were incorporated into construction plans under the former administration,
without the collaboration of technology services. Neither school site administrators nor district
technicians understand the equipment, and it is not being utilized.
The district would benefit from determining if the IP video systems installed during moderniza-
tion are necessary and will be used by the schools. If they will be used, technicians and school
staff should be trained in system use and maintenance. Until this determination is made, the
district should postpone installation of additional IP video systems during modernization and
new construction projects. These systems are very expensive and can be installed after moderniza-
tion if desired.
Recommendations
The district should:
1. Determine whether the IP video systems installed during modernization
are necessary and will be used by the schools. In the meantime, postpone
installation of IP video systems during modernization and new construction
projects.
BurlingaMe school District
12
Fiscal crisis & ManageMent assistance teaM
13
TecHnician su PPorT services
Technician Support Services
Maintenance and Replacement Costs
The district does not maintain an inventory of parts and supplies routinely used by technicians to
repair equipment. Because there is no clearly established responsibility for the costs associated with
technology maintenance including replacement parts (hard drives, projector bulbs, toner cartridges,
etc.), technicians struggle to keep classroom technology operational. A list of technology supplies
commonly utilized to maintain equipment throughout the district would help ensure that materials
are available so technicians can quickly address routine repairs and replacements.
An operational policy that explains who is responsible for the cost of technology repairs, mate-
rials, and long-term replacement of network equipment, printers, computers and other items
would eliminate the confusion related to purchasing items necessary to complete repairs. For
standard equipment, the district should purchase replacement items in bulk to obtain the best
pricing. Inventory of replacement parts can be centralized, or group orders can be placed and
distributed to individual sites. For example, the district installed a new Smart board in every
classroom in the district, so a bulk purchase of projector bulbs would yield a better price. A
supply of bulbs could be kept at the district office or at each site for quick and efficient replace-
ment, minimizing instruction downtime. The cost of the inventory could be distributed among
sites or charged out as used.
The district may also consider training one or two teachers at each site how to replace projector
bulbs because technician support is not available each day. This would minimize downtime for
Smart boards, which teachers utilize daily.
Communications
The district’s ability to effectively implement and use technology is hampered by ineffective
communications between the technology department and other departments and school sites.
District staff lacks a clear understanding of project status due to inadequate leadership in the
technology department, communication and follow-up on technology projects. The technology
department also does not always participate in the planning for modernization and construction
projects, making it challenging to implement, configure and support new equipment. Including the
technology department in the planning stages of all modernization and construction projects would
help ensure that plans and drawings accurately depict the district’s existing infrastructure and that
all new equipment and infrastructure improvements work with existing technology infrastructure.
The month to month information technology (IT) operational issues that affect the district and
sites are not well communicated among technology staff, site staff and district administration.
Communication is lacking regarding student data collections and reporting for CALPADS,
attendance, and report cards. The absence of a strong, experienced technology leader leaves IT
technicians struggling to keep up with daily operations, deadlines and proper communications
related to important deadlines that could negatively affect the district if not met.
A district-wide IT operational calendar could help the district meet these deadlines. A sample
calendar is provided in Appendix B. A typical calendar would run July to July and list which
reports are due and which events need to take place for district operations in each month.
Preparing the calendar should be a collaborative activity, with site input. The calendar should be
updated in June of each year and should be shared with district administration and site leadership
to ensure successful technology operations.
BurlingaMe school District
14
TecHnician su PPorT services
Help Desk
Many of those interviewed expressed a frustration at the lack of a help desk or some form of
ticketing/tracking system to acknowledge their request for technological assistance. The district
attempted to implement a help desk system in the past, but it was not adhered to by technicians
or end users, who continued to email and interrupt technicians who were working on other
technology matters. Several sites manage service requests by maintaining a clipboard where staff
members record their technology issues. The technicians then utilize these lists to guide their work
at the sites each week. This practice bypasses a formal work order system contributing to inefficien-
cies in prioritization and assignment of work by the technology department supervisor. The lack of
a standardized process for managing technology service support requests through a structured help-
desk system creates significant inefficiencies in the management of daily technology support duties.
A properly implemented work order system would greatly enhance the tracking and control of
work order requests, would allow the technology department supervisor to better organize and
prioritize assignments, and would assist in assessing support teams’ productivity. Other benefits
include improved communication, access to work order status and equipment repair history.
A single project manager should lead the search for an acceptable application and oversee its installa-
tion and transition timeline. The transition timeline should be established and communicated district-
wide. Users should understand the purpose of the new system and its benefits, should be sufficiently
trained in its use, and should be required to use it to request technology support services.
Technician Tools
Staff reported during FCMAT interviews that site technicians often are not equipped with the
tools necessary to perform the most basic network troubleshooting. One technician reported
using their own personal hard drive duplicator because the district has no imaging software.
When asked about tools such as network cable testers and phone test sets, only one technician
had a test set and the others thought a cable tester might be available somewhere in the district.
Providing each technician with a tool bag that is equipped with the tools listed below would
increase their efficiency in providing routine services. Each technician should be equipped with
an inexpensive cable tester and have the ability to check out a phone line test set or larger cable
tester from a centralized location for technician tools such as the district office.
Equipment Position 1 Position 2
Small Phillips #1 x x
Normal Phillips #2 x x
Normal Standard x x
Small Standard x x
7/16 Nut Driver for Projector Mounts x
Nut Driver for PC x
CAT5 Line Tester x
CAT5 Stripper x
Channel Lock Wrench x x
Crescent Wrench x x
Electric Probe x x
Electrical Scissors x x
Fiscal crisis & ManageMent assistance teaM
15
TecHnician su PPorT services
Flash Light LED x x
Gloves x x
Level x x
Needle Nose Pliers x x
Punch Tool x x
RJ11 Crimp Tool x
RJ45 Crimp Tool x x
Safety Glasses x
Tape Measure x
Termination Tool for CAT5/6 x x
Toner Set x x
Utility Knife x x
Wire Cutter x x
Wire Stripper x x
Parts
Electric Tape x
Zip Ties x
Zip Tie Holders x
Screws x
RJ45 Ends x
RJ11 Ends x x
Recommendations
The district should:
1. Create a list of standard technology supplies commonly used to maintain
equipment so that technicians can efficiently address routine repairs and
replacements.
2. Establish an operational policy that designates financial responsibility for
the cost of technology repairs and materials and long-term replacement of
network equipment, printers, computers and other items needed to maintain
technology equipment.
3. Include the technology department in the planning stages of all moderniza-
tion and construction projects to ensure that plans accurately depict the
district’s infrastructure and that all specified new equipment and infrastruc-
ture improvements are compatible with existing technology.
4. Research and implement a help desk system to manage technology service requests.
5. Outfit each technician with a tool bag containing the tools necessary to
conduct routine service needs.
BurlingaMe school District
16
Fiscal crisis & ManageMent assistance teaM
17
insTruc Tional Tec HnoloGy
Instructional Technology
The Burlingame School District has integrated technology extensively in classrooms for use
in instructional delivery. However, school site staff expressed their frustrations regarding the
district’s approach to technology implementation as well as the adequacy and consistency of
support from the technology services department. The district has a mix of technology equip-
ment including Apple and PC products.
Computer Labs
During FCMAT interviews it was shared that PC labs were installed at each school site several
years ago over the summer, and that this decision was made without collaborative input from site
and technology staff. These computer labs all run at different efficiency levels. Some work well
for the students and the instructional program, while others take a long time to log in and run
very slowly. FCMAT validated the concerns expressed by staff members at the Washington school
site, where the labs and servers are not properly configured. The roaming profiles being used are
not properly configured and need to be checked and set up properly. A vendor or school district
that has Windows server and XP desktop experience could reimage the PCs and reconfigure the
servers to work efficiently. Although the PCs in the school labs are a few years old, they are good
quality dual-core machines that should have another year or two of useful life.
While there are PC labs at each site, mobile carts seem to be much more student/teacher friendly
in the K-5 environment. Most teachers interviewed by FCMAT favored the use of the mobile carts.
However, prior to any change in school site technology supporting the instructional program, a
committee of teachers and administrators should collaborate to identify the best options.
Staff shared that students constantly change the desktop configuration settings on the computers
in the PC labs. This alters what appears on the monitor, which interferes with the delivery of
instruction. Software such as Deep Freeze allows students to fully use the computers even to
the point of deleting the operating system, without permanently changing the computer. When
this software is utilized, once a student is done using the PC and the computer is rebooted, the
original settings are immediately restored. This ensures that each computer is set up and looks
the same for each student. It also greatly reduces the demands on technician support for labs.
Professional Development
Nearly all staff interviewed (teachers, technicians, secretaries, principals) expressed concern
about the lack of professional development or training in technology. One teacher stated, “I
know basically how to use the Smart board, but I don’t know how to teach with it.” The district
should create a professional development plan that includes the student information system
(Power School), CALPADS, Windows server and desktop, Lexia software, Smart board, and
other hardware and software tools utilized by staff. Technology staff could benefit from attending
the California Education Technology Professionals Association (CETPA) conference or other
technology conferences, or working with other school districts in the area.
Student Data
During staff interviews it was noted that the district is considering an online student registration
system with integration into Power School. While this has been accomplished in many other
districts, the skill level of technology staff may make it too ambitious a project for the district to
BurlingaMe school District
18
insTruc Tional Tec HnoloGy
undertake at this time. Any plan to develop and implement a student registration system should
involve a committee of stakeholders to ensure the plan is thorough and considers the needs of
system users.
Several administrators noted that Power School’s integration with the DataDirector assessment
management system does not function optimally. Certain data elements do not transfer prop-
erly from Power School into DataDirector. This has caused the administration some concern
regarding the accuracy of the data in the assessment program. DataDirector is widely used in
public education and is fully compatible with Power School, according to the DataDirector
website. DataDirector software support could help determine whether an integration issue needs
to be addressed. The issue also may involve data input into Power School.
The district should provide training for site secretaries regarding the importance of the new
CALPADS program and why proper data input is critical to accurate student data reporting. The
advancement of student data reporting means virtually every keystroke entered into a student
information system is uploaded and verified by the California Department of Education via
the CALPADS system. Many fields are required for proper CALPADS reporting, and everyone
who enters data into the district’s student information system should know which data fields are
required and why they are important. It is essential to standardize and master the data input that
feeds into these reports and ensure that student data is entered timely, consistently, accurately,
and to CALPADS specifications. Starting with school year 2012-13, districts could be penal-
ized for not submitting accurate, timely student information through the CALPADS reporting
system.
The district does not have a standardized grade reporting system. Teachers create and maintain
student report cards in Excel spreadsheets or other applications on their laptop local drives. This
does not allow front office staff to reprint report cards for parents. An online report card system
would allow teachers and parents to communicate, access, and track student progress online.
Recommendations
The district should:
1. Contract with a vendor or school district that has Windows server and XP
desktop experience to reimage the PCs and reconfigure the servers to work
efficiently.
2. Establish a committee of teachers and administrators to identify the best
options for integrating technology into the classroom.
3. Research and implement a software application that restores original desktop
configuration settings when computers are rebooted.
4. Postpone integrating an online student registration system with the student
information system until an implementation plan is developed and tech-
nology leadership is in place.
5. Develop a professional development plan to implement new technology into
the workplace and educational programs.
Fiscal crisis & ManageMent assistance teaM
19
insTruc Tional Tec HnoloGy
6. Send technology staff members to CETPA or other technology conferences or
to network with nearby school districts as additional sources of training.
7. Provide training to site personnel responsible for entering student informa-
tion to ensure that data entry is timely, consistent and accurate district-wide
and meets CALPADS reporting requirements.
8. Establish a committee to research online grade reporting tools to better
communicate, access and track student grades and progress.
9. Work with software support providers to mitigate integration issues that exist
between Power School and DataDirector.
BurlingaMe school District
20
Fiscal crisis & ManageMent assistance teaM
21
ManaGeM enT, s TaffinG and co MMunicaTions
Management, Staffing and Communications
The district lacks a technology leader with a clear vision of how the role of technology fits into
the overall vision of the district. Over the last several years, district administrators have attempted
various staffing restructures in an attempt to resolve problems and improve service and commu-
nication in the technology department. However, none of these staffing changes have provided
sufficient leadership that is capable of managing the district’s technology needs. The absence of
a strong, experienced technology leader along with low-performing network systems and lack of
progress on technology upgrades has resulted in high levels of end user frustration. Technology
staff members that oversee department activities do not have formal education or work experi-
ence in technology management that would assist them in managing the rapid growth in district
technology usage that has taken place over the past two to three years.
The absence of an experienced, educated IT leader has resulted in poorly defined priorities,
minimal project planning, lack of network backups, poor network performance, and insufficient
support for curriculum and assessment. Instead of providing proactive, service-oriented support,
IT staff members function in a reactive mode that is inefficient and ineffective. This, combined
with a lack of communication between technicians and management, has led to considerable
mistrust and inability to work as a team.
During IT staff and site staff interviews, staff members were asked if they knew who their super-
visor was. Many of the IT staff and some site staff responded that they were unsure. This lack of
structure can lead to poor work coordination and/or employee accountability.
An IT manager should be given responsibility for all district technology operations. The manager
should oversee the technology staff and communicate with district office administrators and
school principals. The IT manager should have an annual budget that he or she helps to create
that will support technology department operations.
Four IT employees provide all district technology support. This includes CALPADS reporting
and anomaly resolution, and assessment data input/reporting. While these are not traditional
IT functions, some school district IT departments perform them because of the complex data
import and export and data revisions. The lead technician II position handles these duties.
The district has approximately 770 computers and three school site technicians, each of whom
provides support to two school sites. Because school sites have varying levels of technology, one
technician covers 40% of all school site computers while the other two cover between 29% and
31% of the computers each. The technician supporting 40% of the computers works less than
a full-time schedule at six hours a day for 11 months. Two technicians work 12 months at eight
hours a day, and one technician works 10 months at eight hours a day. Technician staffing meets
minimum requirements at this time, although the district has experienced enrollment growth
of approximately 19.62% over the preceding five years and projects an additional 6% over the
next five years. With a new school and the implementation of mandated common core standards
on the horizon, the district will need to re-evaluate staffing and schedules to continue providing
sufficient technical support.
Technicians reported during interviews that they have had little to no training on any of
the systems they support and have few resources to consult for help. In addition, some team
members do not want to work with the other technicians. A strong leader is needed to identify
staff training needs and develop a cohesive team. Strong systems background and networking
experience is necessary to ensure that the staff is capable of providing routine service support.
BurlingaMe school District
22
ManaGeM enT, s TaffinG and co MMunicaTions
The addition of an IT manager position and an applications support specialist would better serve
the district. The position of lead tech II should be eliminated and all support technicians should
be at the same level. The IT manager should coordinate and manage all IT systems. This position
should guide the district through the rebuilding of the server network and site modernizations
that are under way.
Currently, the lead technician II position reports directly to the assistant superintendent/chief
business official (CBO). This reporting relationship is fairly common among California school
districts. The district’s options for organizational models include:
1. Maintain the current reporting line, whereby the IT manager reports to the
assistant superintendent/CBO.
2. Place the IT department in the Educational Services division. This could be
a good option because most the district technology is used to support class-
room instruction. All of the Business Services systems are supported and run
by the county office of education.
3. Establish a direct reporting relationship between the IT manager and the
district superintendent. This has become increasingly common particularly
among large school districts with heavy technology resource implementation
and much larger staffing structures for technology.
Recommendations
The district should:
1. Create a technology management position to oversee, guide and communi-
cate the needs of technology.
2. Increase the 11-month, six-hours-a-day position to eight hours a day to
handle the workload associated with this position.
3. Eliminate the lead IT tech II position. Assign the duties of this position to a
new application support specialist position.
4. Carefully weigh the advantages and disadvantages of aligning IT under
Educational Services versus Business Services.
5. Prioritize IT projects and assign technology staff to complete them. Base esti-
mated time to complete projects on input from the IT manager. Add project
completion dates to the existing project matrix that can only be adjusted with
consent from a district administrator. Conduct a bi-weekly project review by
district administrators to ensure continued progress on stated goals.
Fiscal crisis & ManageMent assistance teaM
23
ManaGeM enT, s TaffinG and co MMunicaTions
6. Establish bi-weekly meetings between the IT manager and administration
to improve communications. Schedule these sessions for no more than 30
minutes, with the focus on providing updated project information and status
of district technology systems.
7. Conduct monthly meetings of the IT manager and school principals to
review site-specific issues and discuss any IT projects that affect the school
site.
8. Conduct twice-yearly IT staff meetings to discuss staff concerns and issues
that may affect classroom instruction. Encourage the sharing of ideas and new
technologies that may be useful to the district’s staff and students.
9. Develop an organizational chart showing the direct chain of command for
each technology position so that employees know who to contact when their
immediate supervisor is out of the office.
BurlingaMe school District
24
Fiscal crisis & ManageMent assistance teaM
25
neTW orK discovery audi T
Network Discovery Audit
Cabling
FCMAT engaged the services of Advanced Data Communications (ADC) to thoroughly examine
the cabling infrastructure at the district office and each school site. For each location, ADC
created a site map (Appendix E ) that identifies existing network cabling, data drops and other
infrastructure throughout the location, and an inventory list (Appendix F) of network elements
and how they are labeled. For each location ADC also documented deficiencies that should be
addressed by the district and made recommendations for resolving these issues (Appendix G).
Since the appendices address specific findings and recommendations, they can be referred to for
details. This section will summarize the findings and recommendations.
Technology staff utilize network equipment racks to manage telecommunications wiring and
connections to workstation devices throughout the district. These racks are commonly referred
to as IDF/MDF (intermediate distribution frames/main distribution frame). At most sites, IDF/
MDF is not in a closed, secured room. In some locations the switches are placed inside closets
rather than a suitable rack or enclosed box designed to house this type of equipment. Some
network equipment is located and exposed in high traffic areas. MDF/IDF locations should be
in secure areas where equipment cannot be tampered. Locations should be locked and provide
adequate environmental controls including ventilation and climate control to prevent equipment
from overheating.
Cabling appears to be an afterthought at each site. Site inspections showed that little planning
has been done to identify where cable and patch panels should be located. Much of the work was
completed incorrectly. Examples of inconsistencies and deficiencies include:
• Patch panels are in two different locations; some are in the wall
• Old cables are still in rack and behind some of the wall plates
• Some cables are CAT5; some are CAT5e
• Indoor cable was used outside, resulting in deteriorated cabling and loose connections
• Cable is more than the standard length (298 ft.)
• Cables coming from the location going to IDF are plugged directly into switch
• Cables are pinched on the pathway by zip ties
• Materials used on pathways are not to code
The district has an opportunity to resolve many of the deficiencies through its campus modern-
ization projects by factoring network cabling and power needs into the remaining modernization
projects. Areas that should be addressed in modernization plans include:
• Relocating and securing equipment racks (MDF/IDF)
• Providing adequate power and environmental controls for equipment
• Providing sufficient rack space for equipment and cable management
• Removing all CAT5 cabling, and replacing it with CAT6 or better cable
• Removing all abandoned cabling and patch panels
BurlingaMe school District
26
neTW orK discovery audi T
Technology infrastructure deficiencies could have been prevented through proper planning. For
sites that have already gone through modernization, the district should seek opportunities to
correct the existing issues. In some cases a contractor may need to perform the work to correct
the deficiencies. However, some issues can and should be resolved by district IT staff.
Equipment in MDF and IDF racks is not organized, which complicates troubleshooting and/
or locating cables. Components of the network such as patch panels, switches, and fiber panels
should be organized in standard positions to ensure technicians can efficiently address problems
as they occur. Specific issues include the following:
• Patch cables are too long, bunched and tangled, so technicians must weed through them
to find the correct cables and address issues.
• Patch panel, cables, faceplates and jacks are not labeled, which makes it difficult to find
where a cable in the network equipment rack is plugged in.
• No map in IDF. A map would allow the technician to see which network plugs are in
each room without having to physically go into the room to look.
The following tables are sample standards formats that specify the order in which equipment,
patch panels and cable management is installed in the racks, cabling standards such as patch
cable length and color, and equipment and cable labeling:
Equipment Rack Cable Standard (Sample)
Endpoint Color Length
Workstation Yellow (CAT5e or better) 2 ft.
IP Phone White (CAT5e or better) 2 ft.
Access Point Purple (CAT5e or better) 2 ft.
Network Device Orange (Fiber, CAT5e or better) 4 ft.
Equipment Rack Standard (Sample)
*based on a standard 12u equipment enclosure
Fiber Patch Panel
WAN Router
Cable Management
Copper Patch Panel
Cable Management
Switch
Copper Patch Panel
Cable Management
Switch
McKinley Elementary School IDFs are connected over copper. However, fiber connections
between the network equipment racks would enable longer cable runs, higher throughput and
less signal loss. The district has fiber running between network equipment racks at most of the
schools, so this appears to be an exception.
Fiscal crisis & ManageMent assistance teaM
27
neTW orK discovery audi T
Terminated fiber cable remained in several locations between IDFs, which may affect network
performance.
Recommendations
The district should:
1. Provide a secure area for the MDF/IDF on all sites, including the district
office, to ensure equipment is properly safeguarded against tampering and
environmental factors.
2. Address deficiencies in cabling and power in future modernization plans, and
factor these needs into the remaining modernization projects.
3. Develop a plan to address the deficiencies identified, which at a minimum
should include the following items:
• Purchase patch panels so that cables can be punched down, rather than being
directly connected to network equipment.
• Purchase cable management equipment and Velcro strips to properly secure cabling.
• Remove abandoned cables as the opportunity arises.
4. Develop a district standard that specifies the order in which equipment, patch
panels and cable management are installed in the racks.
5. Establish standards for cabling such as patch cable length and color.
6. Establish standards for equipment and cable labeling.
7. Post established standards in each MDF/IDF location along with site floor
plans for faster cable identification and troubleshooting.
8. Pull terminated fiber cable between IDFs to improve network performance.
Local Area Network (LAN)
During interviews, staff at McKinley School reported that student lab computers were very slow.
FCMAT assessed lab computers and noted they took more than seven minutes to boot and
become operational. FCMAT reviewed the configuration settings and found that the switches
were connected on fast Ethernet ports. Lab computers were plugged into HP switches, while staff
computers, phones and access points were connected to Cisco switches. Both the HP and Cisco
switches support small form-factor pluggable modules, which would allow the switches to be
connected at gigabit.
Dynamic Host Configuration Protocol (DHCP) is an application that dynamically assigns IP
addresses to network devices like computers, rather than having someone manually assign them.
DHCP scope is a range of IP addresses that can be used for dynamic assignment. Typically,
DHCP runs from a central server, and all the DHCP scopes are managed from one place. The
district does not run DHCP from a server; instead, technicians configure DHCP scopes for
network devices like workstations, wireless clients and phones on network equipment. In addi-
BurlingaMe school District
28
neTW orK discovery audi T
tion, DHCP scopes are configured on multiple devices for different aspects of the network. MDF
switches have data and IP-phone scopes configured, and routers have user, lab, access point and
wireless scopes.
All schools have Windows servers supporting the computer labs. DHCP scopes could be config-
ured on these servers to support subnets on the respective school campuses. Moving DHCP
scopes from individual network devices to existing servers would enhance the technician’s ability
to manage the technology at their respective sites, and would allow them to improve their skills.
Configurations between the district’s network infrastructure devices are inconsistent, including
those between routers and switches. These inconsistencies are primarily because engineers or
companies utilized their own methods to configure devices while installing Cisco network
infrastructure devices and phone system rather than following district guidelines. Staff stated that
although AT&T was the primary vendor contracted to install the network infrastructure, various
subcontractors performed the installations. While this study does not include a comprehensive
configuration audit, some of the differences in configurations include:
• Hostnames
• Use of enable and enable secret
• Simple Network Management Protocol (SNMP) configuration
• Console and remote access configuration
Standards for device configuration would include naming and addressing conventions and a
security framework that fits the organization. Once standards have been established for device
configuration, all future configurations can be done using that framework. A sample configura-
tion standard is provided in Appendix D.
The district has insufficient security controls on its network routers and switches. While the
network devices natively support security features to protect from unauthorized access and
network problems, many of these features are not enabled on the devices. While this study did
not include a comprehensive security audit of the network devices, some of the weak security
features currently enabled include:
• Enable password – Network switches use the older enable password command, which
uses a weak encryption algorithm.
• No Management ACLs – No access control lists are configured to prevent hosts from
attempting to connect to network devices from any location on the network.
• Telnet Management – Both vty and tty lines allow an administrator to connect to
network devices for management. Telnet is enabled on device vty lines, allowing for
unencrypted device management over the network.
• HTTP Server Enabled – Allows remote hosts to manage device configurations using a
web browser.
Network security is vital to any network, and is often assessed separately. The primary security
emphasis for this assessment was on the network elements that provide access to endpoints
including switches, routers and firewall. Many of these elements are manufactured by Cisco
Systems, and many documents are available on the Internet cover device hardening. Hardening
is the process of making a device more secure by disabling unsecure features and utilizing other
security features to prevent unauthorized access. District technology staff can employ any avail-
Fiscal crisis & ManageMent assistance teaM
29
neTW orK discovery audi T
able security feature that applies to the district’s network environment by accessing the Cisco
Guide to Harden Cisco IOS Devices at http://www.cisco.com/en/US/tech/tk648/tk361/technolo-
gies_tech_note09186a0080120f48.shtml#aaa
All unsecure network protocols used for network device management, such as Telnet and HTTP,
should be disabled. Protocols such as SNMP should be configured properly to prevent unauthor-
ized access to the network devices. In addition, access control lists prevent network devices from
being managed from anywhere in the district. Device management should be restricted to a
single subnet on the district’s WAN, and to a few hosts.
The Burlingame Intermediate School campus has a Cisco Secure ACS server that is only being
used to provide 802.1 x authentications for clients that connect to the wireless network. District
technology staff can use the Cisco Secure ACS server for authentication, authorization, and
accounting on network devices. This would allow the district to create a management account
for all network devices in one location. If changes need to be made to the account, they are made
on the ACS server rather than at each device. More information pertaining to Cisco Secure ACS
network access restrictions can be obtained at this link: http://www.cisco.com/en/US/products/
sw/secursw/ps2086/products_tech_note09186a0080858d3c.shtml
The district lacks an updated network equipment refresh plan. Staff referred FCMAT to the
district’s Education Technology Plan for the years 2008 – 2013. While the document states that
the plan will be reviewed annually, there is no indication that it has been reviewed and updated
since it was created. Technology staff stated that they did not play a role in developing the
current Education Technology Plan and that no updates have been done.
Education technology plans should be reviewed and updated annually because rapidly changing
technology shifts the priorities. A network equipment refresh plan should be included in the
district’s plan. This network equipment refresh plan should be reviewed annually to ensure
that devices approaching the end of their useful life are identified and a plan is established for
their replacement. The district’s network infrastructure was upgraded in early 2009, with most
switches and routers replaced. Several of those devices have already reached the manufacturer’s
(Cisco’s) end of life date, and Cisco has established dates for phasing those devices out of support.
The district does not have an established plan for replacing devices before they reach the point
when service contracts can no longer be renewed. The service contract renewal periods for devices
managed by the district are provided below and may be accessed through the links provided.
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: HW Renewal Date: HW
Cisco Catalyst 3750 and
Jan. 4, 2010 July 4, 2013 Sept. 30, 2014
3560 switches
http://www.cisco.com/en/US/prod/collateral/switches/ps5718/ps5023/end_of_life_notice_c51-574778.html
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: HW Renewal Date: HW
Cisco 2800 Series Integrated
Nov. 1, 2010 Oct. 31, 2014 Jan. 30, 2016
Services Router
http://www.cisco.com/en/US/prod/collateral/routers/ps5854/eol_c51-631228.html
BurlingaMe school District
30
neTW orK discovery audi T
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: HW Renewal Date: HW
Cisco 4400 Wireless LAN
Dec. 13, 2010 June 12, 2014 Sept. 8, 2015
Controller
http://www.cisco.com/en/US/prod/collateral/wireless/ps6302/ps8322/ps6366/end_of_life_notice_
c51-634665.pdf
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: HW Renewal Date: HW
Cisco 4400 Wireless LAN
Oct. 24, 2011 April 23, 2013 July 19, 2016
Controller Module
http://www.cisco.com/en/US/prod/collateral/modules/ps2797/ps6730/end_of_life_notice_c51-691054.html
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: OS SW Renewal Date: OS SW
Cisco ASA 5510 Software
Aug. 23, 2011 Feb 20, 2013 May 18, 2016
Release 8.0l
Hardware is still supported, but the software running on the device is end of life
http://www.cisco.com/en/US/prod/collateral/vpndevc/ps6032/ps6094/ps6120/end_of_life_c51-682452.html
The district has no backup archive of its network devices. During interviews district technical
staff recalled a recent failure of a wireless module in a router. Because there was no backup of the
configuration, the device had to be rebuilt from sample configurations on other devices.
Device configurations should be regularly backed up and archived in a secure, accessible network
location. Device configurations should also be backed up before new configurations are made, to
ensure easy roll-back if mistakes are made.
The district lacks a documented disaster recovery plan. A plan is necessary to ensure business
continuity in the aftermath of a disaster. The plan should be reviewed annually to ensure that all
critical systems, procedures and response teams are updated. Team members should also annually
simulate disaster scenarios to identify and correct deficiencies in the plan. The disaster recovery
plan should address the following items:
• Identify critical systems and data (payroll records, accounting records, student records,
equipment inventory, policies and procedures, etc.)
• Define response team and their individual responsibilities
• Off-site and on-site data and media storage
• Computer recovery facilities (hot sites)
• Recovery plan
The district purchased Cisco SmartNet maintenance contracts for multiple Cisco phones and
access points. These contracts are unnecessary and costly. SmartNet for a single IP phone and
Access Point would allow Technical Assistance Center (TAC) cases to be opened with Cisco, or
software updates can be downloaded. It would be much more cost effective for the district to
purchase a spare of each device in the event that a unit fails.
Fiscal crisis & ManageMent assistance teaM
31
neTW orK discovery audi T
During interviews, technology staff stated that the district plans to upgrade the county connec-
tion from 100Mbps to 250Mbps to address issues with poor network performance. As previously
mentioned in WAN findings, testing determined that the performance problems being experi-
enced by the schools are related to the configuration of lab servers and workstations, and not the
WAN or county office connections. Upgrade in connection speed will not resolve poor network
performance and would be an unnecessary expense. The issues raised by staff concerning slowness
are local network issues and are unrelated to the Internet connections. Additionally, the district
firewall, Cisco ASA5510, is not capable of passing 250 MB of data in and out with 100 MB
interfaces. The following link provides information regarding this device: http://www.cisco.com/
en/US/prod/collateral/vpndevc/ps6032/ps6094/ps6120/product_data_sheet0900aecd802930c5.
html
The district utilizes a Cisco 7206VXR router to connect to the county office of education. The
use of this router is not necessary because when the school district upgraded the WAN and
county connections to OPT-E-MAN, Cisco 3750ME switches were installed to support the new
connections. While the Cisco 7206VXR router previously was required for the county connec-
tion, changes in the network infrastructure provide better alternatives. Connection to the county
office should be moved to the newer Cisco Catalyst 3750ME switch, and the Cisco 7206VXR
router should be removed from the design. This change would require some new configuration to
be performed on the 3750ME switch but would simplify the design and remove a potential point
of failure from the network. The district could also cancel the SmartNet maintenance agreement
and save money.
Recommendations
The district should:
1. Remove DHCP scopes from individual network devices and configure local
DHCP servers to enhance the ability of technicians to manage technology at
sites.
2. Develop and maintain written standards for network device configurations
that include device naming conventions, management methods, configura-
tion settings and security requirements.
3. Access the Cisco Guide to Harden Cisco IOS Devices, to obtain security
features that apply to the district’s network environment. Disable all unsecure
network protocols used for network device management.
4. Ensure that protocols such as SNMP are configured properly to prevent
unauthorized access to the district’s network devices.
5. Review and update the Education Technology Plan annually.
6. Establish a plan for replacing devices prior to the end of the service contract.
7. Establish a backup archive for all network devices to ensure that established
configurations are preserved and available should a failure occur and recon-
figurations become necessary.
BurlingaMe school District
32
neTW orK discovery audi T
8. Develop and document a disaster recovery plan. A sample plan is attached as
Appendix H.
9. Discontinue the practice of purchasing and/or renewing multiple Cisco
SmartNet maintenance agreements. Use the cost savings for replacement/
spare devices.
10. Cancel the upgrade of the county office of education connection. Move the
connection to the newer Cisco Catalyst 3750ME switch installed during
recent upgrades and reconfigure appropriately.
11. Remove the Cisco 7206VXR router from the district’s network design.
12. Discontinue SmartNet maintenance agreement associated with the Cisco
7206VXR router.
Phone System
The district’s voice servers have not been patched or upgraded since they were installed. The
Cisco Voice over IP (VoIP) system was installed in 2009. The system has six servers providing call
control, voicemail, enhanced 911 and conferencing services. These servers should be upgraded to
the latest supported version for the hardware the system is installed on. The district technical staff
has little experience with the VoIP system other than basic adds/moves/changes.
The district does not have an equipment refresh plan for its telecommunication systems. District
technology staff expressed their lack of knowledge pertaining to the system during interviews.
There was no indication that the district has developed a plan to keep the hardware and software
maintained. The ongoing maintenance and replacement of VoIP system equipment should be
included in the Education Technology Plan. While the system was upgraded in 2009, Cisco has
made numerous changes to the product since then. Most of the software installed on the servers
has already reached the manufacturer’s end of life, and Cisco has established dates for phasing
that software out of support. The district should have a plan to refresh these systems, including
both hardware and software, before the point when service contracts can no longer be renewed.
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: SW Renewal Date: SW
Cisco Unified
Communications Manager Dec. 23, 2011 June 22, 2013 Sept. 18, 2014
7.1
http://www.cisco.com/en/US/partner/prod/collateral/voicesw/ps6788/vcallcon/ps556/end_of_life_notice_
c51-695269.html
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: SW Renewal Date: SW
Cisco Unity Connection 7.1 Dec. 23, 2011 June 22, 2013 Sept. 18, 2014
http://www.cisco.com/en/US/partner/prod/collateral/voicesw/ps6789/ps5745/ps6509/end_of_life_notice_
c51-695712.html
Fiscal crisis & ManageMent assistance teaM
33
neTW orK discovery audi T
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: SW Renewal Date: SW
Cisco Emergency Responder
April 12, 2010 Oct. 11, 2011 Jan. 6, 2013
7.0
http://www.cisco.com/en/US/partner/prod/collateral/voicesw/ps6789/ps7046/ps842/ps9746/end_of_life_
notice_c51-588829.html
End of SW Maintenance End of Service Contract
End-of-Life Date
Release Date: SW Renewal Date: SW
Cisco MeetingPlace Express Oct. 31, 2009 May 1, 2011 July 27, 2012
http://www.cisco.com/en/US/prod/collateral/modules/ps2797/ps6730/end_of_life_notice_c51-691054.html
Voice servers have not been backed up since they were installed. Backups were configured by the
vendor, who performed manual backups when the servers were initially configured, but no sched-
uled backups were configured afterward. The voice servers should be backed up to a network
server or workstation running secure file transfer program (SFTP) software. Free SFTP software
can be downloaded and installed on most windows platforms. These SFTP servers are supported
and recommended:
• Open SSH—for Unix systems
• Cygwin—http://sshwindows.sourceforge.net/
• Titan—http://www.titanftp.com/
• GlobalSCAPE EFT Server, formerly known as GlobalSCAPE’s Secure FTP Server
The enhanced 911 system, Emergency Responder, has not been maintained since it was initially
installed. It is not clear if the system is providing its intended function. Emergency Responder
is supposed to identify the specific location a 911 call was placed from including the address,
building and room. Unless a clear purpose and design can be demonstrated and district staff
is trained to maintain the system, it does not need to remain on the network. Removal of the
Emergency Responder server will allow the address of the location where the 911 call originates
to be determined from the local gateway, letting responders know where to go. District staff
should consult a qualified Cisco Partner that understands Emergency Responder before deciding
whether or not to keep this system.
The district installed but has never used a MeetingPlace Express server that enables audio, video
and web meetings. A clear purpose and design should be demonstrated to justify the need for
the server. If the server is to be kept, district staff should be trained to maintain the system.
Otherwise, it can be removed from the network. Staff should consult a qualified Cisco Partner
that understands MeetingPlace Express before deciding whether or not to keep this system.
During interviews, site personnel stated that that caller identification on the phone system is
not programmed to identify each school site by its proper name. For example, when a call goes
out from the district office its caller ID says Burlingame Intermediate School. This causes parent
confusion as to where their return calls should be directed. Another user stated that the voicemail
message playback is too fast, and they are unable to get all details on the first pass. FCMAT also
discussed changes to the current dial plan with district technicians, where it became apparent
that they do not know how to change system settings. IT staff should be adequately trained on
the features and functions of the VoIP system so they can perform routine maintenance tasks.
BurlingaMe school District
34
neTW orK discovery audi T
Until district technical staff gain knowledge of the VoIP system, the district will need to contract
with a reputable Cisco vendor who is certified in VoIP to address configuration and program-
ming issues. The district should also establish a relationship with a Cisco Partner to assist in more
complex configuration tasks.
FCMAT found that staff members at Washington Elementary use two different systems for
paging. Site staff utilize the newer Cisco phone system for zone-based paging, and an old phone
is kept at the front office for All page. After further investigation, it was determined that the
installation of the new phone system was not completed, and the old system was left online
for a single phone to perform pages. The secretaries indicated that intercom and paging works
differently at all sites. The new Cisco phone system should be configured to interface with the All
paging system, and the old phone system retired. The hardware and configuration time required
to complete the task should not be significant, but the district should also establish a relationship
with a Cisco Partner to assist with this.
Recommendations
The district should:
1. Contract with an experienced Cisco Partner vendor to upgrade the Cisco
Voice over IP system to the latest supported version.
2. Include the VoIP system hardware and software refresh plans in the Education
Technology Plan.
3. Back up the district voice servers to a network server or workstation running
SFTP software.
4. Consult with a qualified Cisco Partner to determine whether the Emergency
Responder server should be removed.
5. Consult with a qualified Cisco Partner to determine whether there is a need
for the MeetingPlace Express server. In the absence of an identified purpose,
remove the server from the network.
6. Send technical staff to basic administrative training for the VoIP system to
enable them to perform routine maintenance tasks.
7. Establish a relationship with a Cisco Partner to check all trunk access lines,
review and reconfigure the caller ID programming, and assist with more
complex configuration tasks related to the VoIP system.
8. Configure the Cisco phone system to interface with the All paging system,
and retire the old phone system.
Wide Area Network (WAN)
The Burlingame WAN was upgraded from frame relay to OPT-E-MAN in November 2008.
OPT-E-MAN is a switched Ethernet service that connects the schools over AT&T’s optical
network infrastructure. The OPT-E-MAN network is a very reliable and scalable service to inter-
connect the school sites. Based on the findings presented by Advanced Data Communications,
Fiscal crisis & ManageMent assistance teaM
35
neTW orK discovery audi T
the WAN does not need to be redesigned to improve reliability and performance. OPT-E-MAN
can be rescaled in the future based on the district’s needs.
Technology staff shared that the district plans to upgrade the AT&T WAN connections to
each of the sites to address poor network performance. The Washington, Lincoln, McKinley
and Roosevelt elementary school sites all currently have 10Mbps WAN connections, and both
Franklin Elementary School and the district office have 20Mbps WAN connections. The plan
shared with FCMAT is to upgrade the WAN connections to 100Mbps for every location to
improve network performance. On a visit to one of the schools (McKinley), FCMAT did some
testing in one of the computer labs. The testing showed that the performance problems were with
the configuration of the lab server and workstations, and not the WAN connection. Because the
district WAN is adequate and redesign is unnecessary, the technology department should focus
on ensuring that the server hardware is adequate and configurations are correct. Although an
upgrade of WAN lines to 100 MB could provide faster communication between sites, the district
would be better served by using the funds associated with that upgrade to update outdated
servers and aging workstations.
Although FCMAT did not review WAN fiber and uplink ports for duplex and speed issues, the
team believes there may be some problems between sites, servers and other switches communi-
cating with one another via 10/10/1000 speed due to different manufacture type. The district
should check each router and switch for proper duplex and speed adjustment between switches,
routers, and servers. This will ensure that each piece of network equipment is performing at the
speed expected and will deliver a more reliable network.
The district does not have current diagrams of the network. Network diagrams presented by
district staff were created in November 2008 by Eaton and Associates, and there is no indication
they have been updated.
Recommendations
The district should:
1. Ensure that server hardware is adequate and configurations are correct.
2. Create updated network diagrams to reflect all existing LAN and WAN
devices and connection types.
BurlingaMe school District
36
Fiscal crisis & ManageMent assistance teaM
3377
aPPenddricaefsT
Appendices
Appendix A - Active Directory Structure Example
Appendix B - Sample IT Calendar
Appendix C - Sample Job Descriptions
Appendix D - Sample Configuration
Appendix E - Network Mapping Diagrams
Appendix F - Network Label Inventories
Appendix G - Network Discovery Audit Findings and
Recommendations
Appendix H - Sample District Disaster Recovery Plan
Appendix I - Study Agreement
BurlingaMe school District
3388
darPPaefnTdices
Fiscal crisis & ManageMent assistance teaM
3399
aPPenddricaefsT
Appendix A
Active Directory Structure Example
Implementing an active directory domain would give the district the ability to assign
individual logins to students and staff. With these individual logins, group associations
could be used to assign security to shared storage between grades and departments for
lesson collaboration, wireless access, content filtering access, private user storage on
servers, and a host of other controls that would help maintain the network. Student IDs
could be assigned from Power School based on Power School student ID numbers or
another ID-based nomenclature. The student IDs would be placed in an organizational
unit that would coincide with the student’s graduation year. This gives students access to
their files, no matter which school they attend in the district. After the students graduate,
the organizational unit can simply be deleted.
BurlingaMe school District
4400
darPPaefnTdices
Appendix B
IT Calendar
Operational Events List 2011-12
High School/Middle School
EXAMPLE
JULY 2011
Enter/update all pertinent student data – Site
Run Query – Missing Pre-Id Data
1 End of Course Exam Results posted in Datawise – DO
14 New year rollover – DO
26 Charter Movement Attendance Reports for previous year - DO
AUGUST 2011
Anomaly Resolution – Ongoing – DO
10 Finalize Master Schedule – Site
15-16 Count of Locator cards not picked up – Site
16 Drop all no-shows by end of day – Site
19 Run Attendance Audit Report - Site
19 Finish entering any missing student data – Site
Run Query – Missing Pre-Id Data
26 Run Enrollment Audit Listing and Students Actively Enrolled in Two Schools reports; send
to schools to resolve problems – DO
26 Run Students with less than N period report for students with less than 6 classes - Site
26 Request SSIDs for new students – DO
31 Deadline for October CAHSEE Pre-ID – DO
31 Enrollment Numbers – DO
SEPTEMBER 2011
Anomaly Resolution – Ongoing – DO
CalPass submission – DO
Fitnessgram Import – DO
Import data from SEIS – DO
Import data from Schoolhouse – DO
2 Send list of students dropped and where to since last day of school in June to
Superintendent – Site
2 Identify students in various attendance programs (Sped Prog 2, College Connection,
CalSafe, etc.) – Site
2 Run Attendance Audit Report; send to IT Dept. by 4 p.m. – Site
2 Enter students in programs such as GATE, Migrant Ed, Homeless, CAHSEE Intensive
Instruction. (reference -Aeries Procedures for Registrars and Counseling Secretaries)
9 First quarter deficiency notices, comprehensive schools – Site
9 First ADA month ends due to DO 9-14, 4 p.m. – Site
12 CALPADS Uploads – DO
22 First session report cards, alternative ed – Site
26 CALPADS Uploads – DO
Fiscal crisis & ManageMent assistance teaM
4411
aPPenddricaefsT
28 Review Exit Reasons and Summer Withdrawal reasons for 10-11 - Site
28 Verify and finalize all graduate data - Site
30 Enrollment Numbers – DO
OCTOBER 2011
(Oct. 5 - Dec. 14 - CALPADS Fall 1 Enrollment/Grads/Dropouts Submission Window - DO)
(Oct. 5 - Jan. 18 - CALPADS Fall 2 Staff/Course/Section Submission Window)
Anomaly Resolution – Ongoing – DO
4-5 CAHSEE Testing – Site
5 CBEDs day/Census Day
5 Run Attendance Audit Report – Site
7 Second ADA month ends due to DO 10-12, 4 p.m. – Site
7 First quarter report cards, comprehensive schools – Site
10 CALPADS Uploads – DO
12 Work on Fall 1 (SENR, SINF, SPRG) submissions resolving all fatal errors
15 MAA File - DO
24 CALPADS Uploads – DO
31 Enrollment Numbers – DO
NOVEMBER 2011
Anomaly Resolution – Ongoing – DO
4 Run Attendance Audit Report – Site
4 Third ADA month ends due to DO 11-11, 4 p.m. – Site
4 Second quarter deficiency notice, comprehensive schools – Site
7 CALPADS Uploads – DO
9 Second session report cards, alternative ed – Site
28 CALPADS Uploads – DO
30 Enrollment Numbers – DO
DECEMBER 2011
Anomaly Resolution – Ongoing – DO
2 Run Attendance Audit Report – Site
6 Send Fall 1 reports to sites and district for review
1.1 Enrollment Primary Status by Subgroup
1.6 Graduates and Dropouts by Subgroup
1.9 Completers and Dropouts Count
2 Fourth ADA month ends due to DO 12-9, 4 p.m. - Site
8 October CAHSEE Results available – DO
12 CALPADS Uploads – DO
13 First semester report cards, comprehensive schools – Site
14 Fall 1 Certification Deadline
14 P1 report – DO
22 Enrollment Numbers – DO
30 Load 8th grade feeder school data – DO
30 Fifth ADA month ends due to DO 1-5, 4 p.m. – Site
BurlingaMe school District
4422
darPPaefnTdices
JANUARY 2012
Anomaly Resolution – Ongoing – DO
Work on Fall 2 submissions (SDEM, SASS, CRSE, SCSE) resolving all fatal errors
STAR Writing Pre-ID file due – DO
1 Counselors/Admin to set pre-registration timeline for 2012-13 school year (must be
complete by 4/13/12) - Site
Preregistration for 12-13 school year begins – Site
3 Deadline for February CAHSEE Pre-Id file due - Site
3 Run Attendance Audit Report – Site
6 Run Enrollment Audit Listing and Students Actively Enrolled in Two Schools reports; send
to schools to resolve problems - DO
6 Projected course offering list for 2012-13 due to Instructional Services for approval - Site
9 CALPADS Uploads – DO
10 Send CALPADS Fall 2 reports to sites and district for review
2.4 English Learner Education Services-Student Count Unduplicated
2.5 English Learner Education Services-Unduplicated Count of Teachers Providing EL
3.4 NCLB Core Course Section Compliance-Count by Content Area
3.6 Course Section Enrollment-Count by Content Area
4.1 Staff Count and FTE by Job Classification
13 Third session report cards, alternative ed – Site
13 Run Students with less than N period report for students with less than 6 classes – Site
18 Fall 2 Certification Deadline
23 CALPADS Uploads - DO
27 Run Attendance Audit Report -Site
27 Sixth ADA month ends due to DO 2-3, 4 p.m. – Site
31 Enrollment Numbers - DO
FEBRUARY 2012
Anomaly Resolution – Ongoing – DO
1 Run Query – Missing Pre-Id Data and enter any missing data -Site
4 STAR Pre-Id file due MC – DO
4 Third quarter deficiency notices, comprehensive schools – Site
8 CALPADS Uploads - DO
7-8 CAHSEE Testing - Site
21 CALPADS Uploads - DO
24 Run Attendance Audit Report -Site
24 Seventh ADA month ends due to DO 2/29, 4 p.m. – Site
29 Enrollment Numbers - DO
MARCH 2012
(March 1 - 28 - CALPADS EL Counts Immigration Status Submission Window)
Anomaly Resolution – Ongoing - DO
2 Fourth Session report cards, alternative ed - Site
5 CALPADS Uploads – DO
10 Send Spring 1 Reports to Sites and District for Review
2.1 Title III Eligible Immigrants-Count
2.8 English Language Acquisition Status-Count by Primary Language
Fiscal crisis & ManageMent assistance teaM
4433
aPPenddricaefsT
2.9 English Language Acquisition Status-Census Comparison
2.12 English Language Acquisition Status-ELs Reclassified RFEP
16 Third quarter report cards, comprehensive schools – Site
19 CALPADS Uploads - DO
23 Run Attendance Audit Report - Site
23 Eighth ADA month end due to DO 3-28, 4 p.m. – Site
30 Run Tally of Course Requests –Site
30 Enrollment Numbers - DO
APRIL 2012
Anomaly Resolution – Ongoing – DO
2 CALPADS Uploads - DO
4 Deadline for May CAHSEE Pre-Id file due – DO
5 February CAHSEE results available – DO
10 Import 8th grade immunizations
11 P2 ADA Report Due – DO
15 MAA File - DO
16 CALPADS Uploads - DO
20 Run Attendance Audit Report – Site
20 Complete pre-registration for 2012-13 scheduling (all feeder schools and on-site
students)
- Site
20 Ninth ADA month ends due to DO 4-25, 4 p.m. - Site
20 Fourth quarter deficiency notices, comprehensive schools – Site
20 Fifth Session report cards, alternative ed – site
24-26 STAR Testing – Site
30 Enrollment Numbers - DO
MAY 2012
(May 14 - July 18 - CALPADS Course Comp Program Participation - Discipline/Truancy)
CAHSEE Waiver Submission Windows
Anomaly Resolution – Ongoing – DO
Master Scheduling begins for 12-13
3 Classified evaluations due – Site
4 Identify ELC juniors and get permission slips - Site
8-9 CAHSEE Testing – Site
9 CALPADS Uploads – DO
11 Preliminary Master Schedule to DO – Site
14 EOY 1, EOY 2, EOY 3, EOY 4 Official Submission Window
18 Run Attendance Audit Report – Site
18 Tenth ADA month ends due to DO 5-25, 4 p.m. – Site
23 CALPADS Uploads – DO
30 Exit seniors from Plus schools and enroll in comprehensive sites for graduation – Site
31 Enrollment Numbers - DO
BurlingaMe school District
4444
darPPaefnTdices
JUNE 2012
Anomaly Resolution – Ongoing – DO
1 Send EOY 1, EOY 2, EOY 3 and EOY 4 reports to sites and district for review
4 Second semester report cards, comprehensive schools - Site
4 Run Attendance Audit Report – Site
4 Sixth session report cards, alternative ed; final ADA report – Site
8 Summer School Starts
11 Computer - Advanced Math Proficiencies process - DO
18 Start calling students who have not picked up packets - Site
28 Deadline for students to pick up pre-registration packets – Site
28 Report to DO on status/disposition of students not picking up packets/responding to
calls
- Site
28 Drop all students who have not picked up pre-registration packets – Site
JULY 2012
Anomaly Resolution – Ongoing - DO
Enter/update all pertinent student data – Site
Run Query – Missing Pre-Id Data
1. End of Course Exam Results posted in Datawise – DO
12 New year rollover – DO
18 Certification Deadline for EOY 1, EOY 2, EOY 3, EOY 4
AUGUST 2012
(Aug. 1 - Sept. 1 - CALPADS AYP/API)
Anomaly Resolution – Ongoing – DO
6 Finalize Master Schedule - Site
13-14 Count of locator cards not picked up – Site
14 Drop all no-shows by end of day – Site
17 Run Attendance Audit Report - Site
17 Finish entering any missing student data - Site
Run Query – Missing Pre-Id Data
20 Request SSIDs for new students - DO
22 October CAHSEE Pre-ID file due – DO
24 Run Enrollment Audit Listing and Students Actively Enrolled in Two Schools reports; send
to schools to resolve problems - DO
31 Enrollment Numbers - DO
Fiscal crisis & ManageMent assistance teaM
4455
aPPenddricaefsT
Appendix C
Sample Job Description #1
Application Support Specialist
Position Summary:
Under general supervision of the Manager of Information and Technology, will support users
in the use of Student Information System (SIS) software and other district resource application
systems. Will provide technical support for site personnel, training, software updates, trouble-
shooting, and other PC/MAC applications as necessary.
Representative Duties:
1. Manage and maintain daily tasks for student information systems and district
resource application systems.
2. Support site personnel in the use and proper procedures of student information
systems and district resource application systems.
3. Support internal personnel within the Information and Technology Department
and oversee system protocols that directly affect the operation and functions of
district systems.
4. Complete CALPADS Fall and Spring data submissions.
5. Provide training for all Student Information Systems software and CALPADS.
6. Provide technical support to site users and district system users.
7. Install and maintain Student Information System components district wide,
such as, but not limited to: PowerSchool, DataDirector, Email, CALPADS,
Fiscal 2000, NutriKids, and district web site.
8. Develop district procedures, and system protocols to support department
administration and site functions.
9. Assist in the support of systems and projects as directed by Manager of
Information and Technology.
10. Coordinate SIS new year rollover and printing of required district reports.
11. Manage productivity in the area of new student information technology and
provide the Information Technology department and district with recommen-
dations regarding the district’s student information systems.
12. Be accountable for integrity of district information system data.
13. Responsible for the preparation of files for electronic transmission of data to
various state and education agencies.
BurlingaMe school District
4466
darPPaefnTdices
14. Download and import testing results and other data from CALPADS, and or
DataDirector, Power School SIS
15. system into testing services.
16. Complete all necessary Erate filing 470, 471, and Item 21 for successful SLD
posting.
17. Perform related duties as assigned.
Qualifications:
Knowledge of:
1. 5-8 years of directly related experience in the student information field.
2. Demonstrates competence in Windows operating system environment.
3. Knowledge and 3-5 years experience with Windows XP, Windows 7.
4. Expert knowledge of Excel and data manipulation.
5. Knowledge and experience with CALPADS, PowerSchool, DataDirector,
Web development
6. Possess current industry knowledge of student database system procedures.
7. Possess communication skills to convey technical knowledge in a clear
manner. Demonstrate the ability to assist in resolving various software issues
that arise.
8. Knowledge in the areas of training and instructional programs to improve
staff knowledge and the effective use of student information systems and
other various software systems.
Ability to:
1. Work within and contribute as an integral part of the Information
Technology team; systematic thinker.
2. Ability to work with different file formats for import and export.
3. Communicate and work effectively with others.
4. Understand written and oral instructions.
5. Organize and plan an effective work schedule with users.
6. Install and maintain complex database systems, and applications.
7. Analyze and debug database applications and software problems.
8. Train others in the use and functions of database systems.
9. Provide and maintain documentation of installed systems.
Fiscal crisis & ManageMent assistance teaM
4477
aPPenddricaefsT
10. Work unsupervised on complex software problems.
11. Communicate and work with vendors to diagnose and eliminate software
problems.
12. Respects and maintains professional confidences with all district employees.
13. Utilizes appropriate professional channels for communicating personal/
professional concerns.
14. Demonstrates effective project management and end-user management skills.
15. Work and recognize the necessity for accurate and precise attention to details.
16. Prepare flow and logic diagrams.
17. Develop costs and analyze data for district reports.
18. Work overtime when needed or as directed by the Director of Information
and Technology.
19. Be able to work around students, staff, parents, and administration.
Education and Experience
1. 5-8 years of experience with student information systems and technology
background.
2. Specialized student information software training.
3. CALPADS experience.
Environment:
1. Office environment
2. Constant interruptions
3. High production environment
Physical Demands:
1. Dexterity of hands and fingers to operate a computer keyboard and other
required office machinery.
2. Occasionally lift, carry, push, pull, or otherwise move objects weighing 20 to
40 pounds of force
3. Sitting for extended periods of time.
BurlingaMe school District
4488
darPPaefnTdices
4. Hearing and speaking to exchange information in person and on the tele-
phone.
5. Can travel in district and/or personal motor vehicle.
License and Certificates
1. Valid California Driver’s License.
2. Personal transportation needed for job-related district travel.
3. Obtain auto liability insurance.
Fiscal crisis & ManageMent assistance teaM
4499
aPPenddricaefsT
Sample Job Description #2
Manager Information Technology
Position Summary:
Under minimal supervision, will coordinate with the users in the purchase, installation and
support of networking and desktop hardware and software. Will manage and supervise the tech
support staff as needed. Will provide hands-on technical support for LAN/WAN connectivity,
email, network trouble-shooting, servers, VoIP phone systems and other PC/MAC applications.
The fundamental objectives of this position is to ensure that the district and its various agencies,
schools and sites, students, parents, and community, as well as state and government agencies are
provided with consistent and reliable access to the district’s technology resources.
Essential Functions:
Example of Duties:
1. Manage and maintain daily tasks for IT department staff.
2. Assign and schedule technicians for district technology projects.
3. Assist users in selecting appropriate desktop and network hardware and
software.
4. Provide technical support for network, phone system, and video.
5. Install and maintain local and wide area network components, such as,
Windows Server 2008R2, Cisco routers, Cisco switches, Cat 6 cabling, fiber
optics.
6. Develop automated procedures through staff in support of departmental
functions.
7. Assist in the support of systems as directed by direct supervisor.
8. Maintain web content filters.
Qualifications:
Training and Experience:
1. 5-7 years of experience installing and maintaining networks.
2. Bachelor’s degree and/or extensive equivalent training and experience.
3. Extensive equivalent training and experience may be substituted for bachelor’s
degree.
4. Certified Microsoft courses preferred.
5. Certified Cisco Network Administrator (CCNA) is highly preferred.
6. A+ Certification required, or equivalent experience.
BurlingaMe school District
5500
darPPaefnTdices
Knowledge Of:
1. Macintosh and PC systems, i.e., Windows XP, Windows 7
2. Network operating systems, i.e., Windows 2008, Cisco IOS 11x-12.
3. Office suite applications MS Office XP and 2010.
4. Good knowledge of email systems.
5. iPad deployment.
6. Cisco VoIP phone systems
7. Use of networking and desktop hardware components.
8. Knowledge of LAN and WAN network protocols, IP, OSPF, BGP, IPv6
9. Good working knowledge of Cisco routers and IOS configurations.
10. IIS web server configurations and setup.
11. Excellent working knowledge of Microsoft Active Directory, GPOs
12. Good scripting knowledge, VBS, Pearl, PHP
13. Working knowledge of VoIP, convergence technologies.
14. Wireless networks.
15. Knowledge of Cisco ASA firewalls.
Ability To:
1. Work within and lead a team.
2. Be a leader and communicate and work effectively with others.
3. Understand written and oral instructions.
4. Organize and plan an effective work schedule with users.
5. Install personal computers, networks, and applications.
6. Diagnose and fix hardware and software problems, both in person and
remotely.
7. Train others in the use and functions of network resources.
8. Provide and maintain documentation of installed systems.
9. Provide excellent customer service.
10. Work at multiple sites and locations each day.
Fiscal crisis & ManageMent assistance teaM
5511
aPPenddricaefsT
Licenses and Other Requirements:
1. Valid California Driver’s License
Physical Demands:
1. The physical requirements indicated below are examples of the physical
aspects that this position classification must perform in carrying out essential
job functions.
2. Persons performing service in this position classification-will exert 0 to 50
pounds of force occasionally to lift, carry, push, pull, or otherwise move
objects.
3. May occasionally lift and stack heavy objects not to exceed 50 lbs.
4. This type of work involves sitting most of the time, but may involve walking
or standing for brief periods.
5. Perceiving the nature of sound, near and far vision, depth perception,
providing oral information, the manual dexterity to operate business related
equipment, and handle and work with various materials and objects are
important aspects of this job.
6. Dexterity of hands and fingers to operate a computer keyboard
7. Bending at the waist, kneeling or crouching to file materials
8. Reaching overhead, above the shoulders and horizontally to retrieve files
BurlingaMe school District
5522
darPPaefnTdices
Appendix D
Sample Configuration
The configuration below assumes that the switch is loaded with a K9 image to
support encryption. This is a sample configuration
Enable timestamps on log output that includes the data and time down to the
millisecond.
service timestamps debug datetime msec localtime
service timestamps log datetime msec localtime
Disable source routed packets.
no ip source-route
Enable locally stored passwords to be encrypted.
service password-encryption
Define hostname to be used by the local system.
hostname Site-devicemodel-location (RES-3560G-IDF1)
Define Enable Secret passwords
enable secret 5 XXXXXXXXXXX
Define local user account. This account will be test for local login before RADIUS.
This account should be unique to the site and only given on a need to know basis.
Day to day management authentication to be provided by RADIUS.
username <site admin name> privilege 15 password 7 XXXXXXXXXXX
Define a RADIUS server group that includes the available servers and ports.
Define an authentication banner warning of unauthorized usage. Define
authentication to first check the local database and then use RADIUS if the
account is not found. Use common session IDs.
aaa new-model
aaa group server radius BSD-<site name>
server <radius server ip> auth-port 1645 acct-port 1646
server <radius server ip> auth-port 1645 acct-port 1646
aaa authentication banner ^CUnauthorized use is prohibited.^C
aaa authentication fail-message ^CFailed login^C
aaa authentication login default local group BSD-<site name>
aaa session-id common
Define time zone data for syslog output and local logging.
clock time zone PT -8
clock summer-time PT recurring
Define domain name used for generating local RSA keys.
Fiscal crisis & ManageMent assistance teaM
5533
aPPenddricaefsT
ip domain name <domain name>
Generate local RSA general use keys to enable SSH. When prompted accept the
modulus of 512.
crypto key generate rsa general-keys
Define SSH session timeout and retry values.
ip ssh time-out 60
ip ssh authentication-retries 2
Define spanning tree mode of operation. Define spanning tree priorities on each
VLAN using the following values:
Tier 1 switch: 4096
Tier 2 switch: 8192
Tier 3 switch: 12288
Tier 4 switch: implied default of 32768
spanning-tree mode pvst
spanning-tree extend system-id
spanning-tree vlan 1 priority <defined tier value>
spanning-tree vlan 135 priority <defined tier value>
spanning-tree vlan 935 priority <defined tier value>
Typical end node interface. The port is put into access mode in the appropriate
VLAN and instructed to not to negotiate any other mode. Portfast is enabled
to allow for fast convergence for end stations. BPDUguard is enabled in case
someone connects a switch to the port and potentially cases spanning tree to re-
converge. CDP is disabled.
interface FastEthernet0/1
description <describe connected end node>
switchport access vlan XXX
switchport mode access
switchport nonegotiate
spanning-tree portfast
spanning-tree bpduguard enable
no cdp enable
Typical unused port deployed where ports are not anticipated to be used. No
port should be left in the default VLAN 1 unless there is a specific reason. The
port is put into access mode in the DEAD VLAN (TBD) and instructed to not to
negotiate any other mode. Portfast is enabled to allow for fast convergence for
end stations. BPDUguard is enabled in case someone connects a switch to the
port and potentially cases spanning tree to re-converge. CDP is disabled.
interface FastEthernet0/1
description UNUSED PORT
switchport access vlan XXX
switchport mode access
BurlingaMe school District
5544
darPPaefnTdices
switchport nonegotiate
spanning-tree portfast
spanning-tree bpduguard enable
no cdp enable
Typical trunking interface. The trunk encapsulation mode is manually defined
(not needed on all switches as dot1q is default on some platforms) and the port
is put into trunking mode. The allowed VLANs on the trunk are manually defined.
CDP is disabled.
interface GigabitEthernet0/1
description <describe connected end node>
switchport trunk encapsulation dot1q
switchport mode trunk
switchport trunk allowed vlans X,Y,Z
no cdp enable
Define and describe VLAN 1 management/potential L3 interface. Disable route
caching. Disable IP redirects. Disable IP unreachable packets. Disable IP proxy
ARP (may cause an issue on some systems).
interface Vlan1
description <description of VLAN 1>
ip address <ip address of device>
no ip route-cache
no ip redirects
no ip unreachables
no ip proxy-arp
Define other VLANs if the switch is multi-layer. Disable route caching. Disable IP
redirects. Disable IP unreachable packets. Disable IP proxy ARP (may cause an
issue on some systems).
interface VlanX
description <description of VLAN X>
ip address <ip address of device in VLAN X>
no ip route-cache
no ip redirects
no ip unreachables
no ip proxy-arp
Define default route.
ip default-gateway <default route>
Disable web management systems unless absolutely needed. If needed define
access control lists that restrict access to trusted systems that are authorized.
no ip http server
no ip http secure-server
Fiscal crisis & ManageMent assistance teaM
5555
aPPenddricaefsT
Access lists to define ranges and hosts to accept SNMP read only and read write
communication from.
access-list 20 permit <SNMP RO range> 0.0.0.255
access-list 20 permit host <SNMP RO host>
access-list 20 deny any log
access-list 30 permit <SNMP RW range> 0.0.0.255
access-list 30 permit host <SNMP RW host>
access-list 30 deny any log
Define SNMP logging level as well as target log server. Define a logging facility
that is used by this device type (EX: switches = local3, routers = local4, access
points = local5 and firewalls = local6). Most log servers maintain a separate log
file for each facility; this can speed up searching for specific log entries when the
device type is known. Define SNMP read only community credentials as well as
systems trusted to query this data via access-list 20. Define SNMP read write
community credentials as well as systems trusted to query and set this data via
access-list 30. Define SNMP system description, contact and location.
logging trap critical (recommend informational)
logging <log server IP>
logging facility local3
snmp-server community <community ID> RO 20
snmp-server community <community ID> RW 30
snmp-server location <site name>
snmp-server contact <system contact>
snmp-server chassis-id <device description>
Define RADIUS servers, ports and keys used for authentication.
radius-server host <radius host ip> auth-port 1645 acct-port 1646 key 7
XXXXXXXXXXX
radius-server host <radius host ip> auth-port 1645 acct-port 1646 key 7
XXXXXXXXXXX
radius-server source-ports 1645-1646
Define a login banner in the event an individual that is not authorized logs into
the system.
banner motd ^C
--- Warning ---
This is a private computer facility protected by a security system. Access to and use
of this facility requires explicit written, current authorization and is strictly limited
to the purposes of this organization’s business.
Unauthorized or any attempt at unauthorized access, use, copying, alteration,
destruction or damage to its data, programs, or equipment may violate the Federal
Computer Fraud and Abuse Act of 1986 as well as applicable state law and may
result in criminal or civil liability, or both.
^C
BurlingaMe school District
5566
darPPaefnTdices
Access list to define trusted management ranges and hosts that are permitted
remote SSH access to this device.
access-list 10 permit <management range> 0.0.0.255
access-list 10 permit host <management host>
access-list 10 deny any log
Local console will be controlled by the local database then RADIUS
authentication. Remove “transport output xxx” command to deny using this
device as a jumping point to the rest of the network. Session timeout in 5
minutes.
line con 0
password 7 XXXXXXXXXXX
exec-timeout 5 0
logging synchronous
Local VTY ports will be controlled by local database then RADIUS authentication.
Only SSH is permitted for login and only from systems specified in access-list 10.
Session timeout in 5 minutes.
line vty 0 4
password 7 XXXXXXXXXXX
transport input ssh
exec-timeout 5 0
access-class 10 in
logging synchronous
line vty 5 15
password 7 XXXXXXXXXXX
transport input ssh
exec-timeout 5 0
access-class 10 in
logging synchronous
Define NTP server to synchronize local clock to, syslog output will use this clock
to timestamp output.
ntp server <NTP server IP>
Fiscal crisis & ManageMent assistance teaM
5577
aPPenddricaefsT
Appendix E
Advanced Data Communications - Network Mapping Diagrams
BurlingaMe school District
10RR10DSB
1OP
02J2OP
1OP
40J1OP
80J-70J
MOOR
KAERB
MW
FDM
)PA(
2OP
2OP
10RR10DSB
MW
51J2OP
52J2OP
0653
tsylataC
WS
84 EOPS MW
0753
tsylataC
WS
54J1OP
84 EOP
&
YPOC
5 2 4 3 J J 1 2 O O
P P
1OP
9 1 0 1 J J 2 2 O O
P P
EGAROTS
33J2OP
34J-14J
03J2OP
31J2OP
82J2OP
ECNEREFNOC
MOOR
ROTINOM
53J1OP
82J2OP
2OP
63J1OP
53J-43J
73J1OP 21J2OP
RETUOR
92J2OP
TROP
42
LENAP
HCTAP
2OP
12J-91J
FFO
DNAH
REMOTSUC
)PA(
62J2OP
0043
EM
WS
13J2OP
LENAP
REBIF
NOITPECER
2OP
2OP
RETUOR
52J-22J
72J-62J
03J2OP
NIAM
PU
KCAB
REWOP
ECNARTNE
ECIFFO
TCIRTSID
EMAGNILRUB
5588
darPPaefnTdices
Fiscal crisis & ManageMent assistance teaM
MUIROTIDUA
RPM/AIRETEFAC
10RR40SIB
MYG
RETNEC
AIDEM
2-S
1-S
3-S
10RR30SIB
10RR10SIB
NOITARTSINIMDA
edom-itlum
dnarts
6 si
rebif
llA
1-9
1-8
1-11
1-01
1-7
2-11
2-01
1-6
10P
2-9
2-8
2-7
3-11
3-01
1-5
FDI
kcaR
emagnilruB
10RR20SIB
4-01
3-9
3-8
3-7
2-6
10P
5.01
mR
ot
1.01
mR*
4.11
mR
ot
1.11mR*
regan
2 a 0 M P eriW
4-11
5-01
3-6
2-5
30P
4-9
4-8
4-7
reganaM
eriW
3-5
40P
4-6
reganaM
eriW 50P
5taC
lla
era
selbaC
*
thgiarts
nur
emoh
era
4.21-1.21
mR*
YAW
KLAW
hctiwS
.EoP
0653
tsylataC
hctiws
ot
4-5
hctiwS
.kcaR
oN
SPU
1-21
2-21
3-21
4-21
LOOHCS
ETAIDEMRETNI
EMAGNILRUB
5599
aPPenddricaefsT
BurlingaMe school District
30
mooR
60
mooR
90
mooR
21
mooR
61
mooR
91
mooR
20
mooR
50
mooR
80
mooR
11
mooR
51
mooR
81
mooR
10
mooR
40
mooR
70
mooR
01
mooR
41
mooR
71
mooR
LOOHCS
YRATNEMELE
NILKNARF
Room25
Room24
Room23
yoT
giB
SDLEIF
AERA
YALP
tnemesaB 22 mooR 12 mooR
nilknarF kcaR loohcS
20RR20SEF
len tn a e P m h e c g ta a P n a tr M o P e r 8 iW 4-1
02 mooR
lenaP hctaP troP 84-1 lenaP hctaP troP 42-1 hctiwS evrucorP PH ocsiC
1
gniW
ocsiC
2
gniW
ocsiC
3
gniW
revreS 4 073 CIR SPU
rebif
edomitlum
dnarts
6
netragredniK
10RR10SEF
aideM
esoprup-itluM
retneC
mooR
:ETON
eciffO
no
si moor
eht fo retnec
eht
no
atad
llA
*
30P10RR10SEF
no
era sedis eht
no atad
llA
*
40P10RR10SEF
GNIKRAP
6600
darPPaefnTdices
R ETU
PM
O
BAL
YR
AR BIL
C
N E I C M I D F A FO
Fiscal crisis & ManageMent assistance teaM
1OP evru0C0 9o2rP G h8c4tiwS
21
mooR
11
mooR
01
mooR
90
mooR
80
mooR
70 mooR
60
mooR
FDI
10RR30SEL
42J3OP
51
mooR
tuC
elbaC
41
mooR
31
mooR
50
mooR
40
mooR
30
mooR
20
mooR
10 mooR
K
mooR
LOOHCS
YRATNEMELE
NLOCNIL
KO
O
M O
O
S’REHCAET EGNUOL
BR
EP CISUM MOOR
ITLU M ESO PR U M O O R P
FDM 10RR10SEL
10RR10SEL 1OP MW 2OP 3OP 4OP 0 8 8 80 4 4 44 E E E r 3 e O O OE ll P P P o M r 0 0 0 t 1 2 3 n o 5 5 5 W W W o c 7 7 7 C s 3 3 3 S S S iC e t t t s s s n r y y ye o l l l a a at Z u t t t a a ao C C CR ffO dnaH remotsuC PP 008S2O o cCsAiCM WS 053LM TNAIL ORP PH MreMbi6F/ MTTSA6 pU kcaB rewoP
10RR20SEL
KMNMIL6 R/MESB6IF MW 1OP
oT
MW
10RR10SEL
2OP MW LNP HCTAP ECIOV 0 0 6 6 5 5 3 3 8 8 H H4 4 t t s s C C y y E E l l T TO O a a I I t t P P W W a a C C 2 2 S S V V o o c c s s i i C C
10RR
o 1 T 0SEL
6611
aPPenddricaefsT
BurlingaMe school District
ROOLFTS1
.EVA
AMOLAP
.EVA
EVORG
KAO
11 mooR
01
mooR 9 mooR
8 mooR
pRUP
nwoD
KCART
AERA
YALP
FDI
OP 5 mooR
5 mooR
ATP
6 mooR
7 mooR
kcaR yelniKcM notiveL troP 84-1 lenaP hctaP
4 mooR
r o o o o t l t o f 1 1 o g t 0 0 s g 1 R R 6 4 e 1 R R - h - 1 2 1 5 t s 0 0 t s m S S a m E E o s o o R R i o R F R D * * I*
0 t t n n n n 6 o o e e 5 t t l l m m i i 3 e e v v n n e e e e t a r a L g g L o P P a a p t t r n n r h o h o 8 a a c P c P 4 M M t t a a 4 4 o P P e e 2 2 c r r s i i - - W W i 1 1 C
AERA
YALP
trop 84 evrucorP PH 884-0092 hctiws
3 mooR
10CDNIKCM PH revreS XSO CAM RDOSEM
2 mooR
1 mooR
ROOLFDN2
61 mooR
y m tlu o c o a R F
airetefaC
51
mooR
nwoD
31 mooR
41
mooR
21 mooR
LOOHCS
YRATNEMELE
YELNIKCM
6622
darPPaefnTdices
Fiscal crisis & ManageMent assistance teaM
.TS
YAWDAORB
5
mooR
7
mooR
21
mooR
01
mooR
pU
6 mooR
8 mooR
4 mooR
11
mooR
9 mooR
kcaR tlevesoR
SER
10RR10SER adaveN troP 69-1 lenaP hctaP nretseW troP 69-1)10P( lenaP hctaP notiveL
3 mooR
tsylat h a c C ti w tro s p 0 5 8 7 4 3 ocsiC tsylataC trop 84 ocsiC hctiws 0573 tnemeganaM eriW troP 84-1)20P( lenaP hctaP tiudnaP
2
mooR
1
mooR
enoZ s r k e r l o lo w rt t n e o N C aretsiC 4235 hctiwsatnI etnasA trop 42 0043 EM ocsiC hctiws hctaP CPA troP 42-1 lenaP
.EVA
REVUOCNAV
rev re re v S re S 5. 1 0 2 1 8 X 2 S o O cs c iC aM SPU LX0022 CPA AERA
YALP
41 mooR
51
mooR
TLEVESOR
LOOHCS
YRATNEMELE
6633
aPPenddricaefsT
BurlingaMe school District
31
mooR
21
mooR
11
mooR
ATP
h m ce o e o p R S
7
mooR
1 mooR
egnuoL
s’rehcaeT
ssecca
oN
01
mooR
9
mooR
8 mooR
2 mooR
A9
mooR
41
mooR
11CEN
sretupmoC PH llA
51
mooR
21CEN
EP
roolF
dnoceS
61
mooR
71
mooR
SELBATROP
02P
12P
22P
32P
BAL
RETUPMOC
neewteB
FDI
sroolF
MRKROW
3 mooR
4
mooR
6644
darPPaefnTdices
Appendix F
Advanced Data Communications Network Label Inventories
Burlingame School District
Network Discovery Audit
SITE Burlingame DO RACK BSD01RR01
PATCH PANEL P01
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 N/A
J002 N/A
J003 N/A
J004 2 Office phone no acess
J005 N/A
J006 N/A
J007 2 Asst .Supervisor phone
J008 Asst .Supervisor computer not used
J009 N/A
J010 N/A
J011 N/A
J012 N/A
J013 N/A
J014 N/A
J015 N/A
J016 N/A
J017 N/A
J018 N/A
J019 2 Office phone
J020 Office computer
J021 2 Office phone
J022 2 Office computer
J023 Office computer
J024 2 Office phone
J025 1 Office phone
J026 Office computer
J027 2 Office phone
J028 N/A
J029 2 Office phone
J030 2 Office computer
J031 Office computer no access
J032 N/A
J033 2 Office phone no access
J034 N/A
J035 2 Cubicle phone
J036 2 Cubicle phone
J037 2 Cubicle phone
J038 N/A
J039 N/A
J040 1 Cubicle phone
J041 2 Cubicle phone
J042 2 Cubicle computer
J043 Cubicle Fax analog
J044 N/A
J045 2 Cubicle computer
J046 N/A
J047 N/A
J048 N/A
Note: N/A = Not found
Franklin
Fiscal crisis & ManageMent assistance teaM
6655
aPPenddricaefsT
SITE Burlingame DFO RACK BSD01RR01
PATCH PANEL P02
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 N/A
J002 Cubicle Not Used
J003 N/A
J004 N/A
J005 N/A
J006 N/A
J007 1 Cubicle Phone
J008 N/A
J009 Cubicle Not Used
J010 1 Cubicle Not Used
J011 Cubicle Not Used
J012 2 Cubicle Phone
J013 2 Cubicle computer
J014 N/A
J015 2 Board rm Phone
J016 N/A
J017 2 Board rm A.P.
J018 2 Supervisor Phone No Acess
J019 2 Copier
J020 2 Supervisor
J021 N/A
J022 N/A
J023 N/A
J024 N/A
J025 1 Board rm Phone
J026 2 Board rm computer
J027 2 Board rm Not Used
J028 2 Board rm Not Used
J029 Board rm Not Used
J030 Board rm Not Used
J031 1 Receptionist No Acess
J032 1 Cubicle Phone
J033 N/A
J034 1 Office Phone
J035 1 Office computer
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
BurlingaMe school District
6666
darPPaefnTdices
Burlingame School District
Network Discovery Audit
SITE BURLINGAME IS RACK BIS01RR01
PATCH PANEL P01
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 1 5.4 Phone
J002 1 5.4 Computer
J003 1 5.3 Computer
J004 1 5.3 Phone
J005 1 5.2 Computer
J006 1 5.2 Phone
J007 1 5.1 Computer
J008 2 5.1 Phone
J009 2 6.4 Phone
J010 2 6.4 Computer
J011 2 6.3 PHONE
J012 2 6.3 Computer
J013 1 6.2 Computer
J014 1 6.2 Phone
J015 1 6.1 Computer
J016 2 6.1 Phone
J017 2 7.1 Phone
J018 2 7.1 Computer
J019 1 7.2 Phone
J020 1 7.2 Computer
J021 1 7.3 Phone
J022 1 7.3 Computer
J023 2 7.4 Computer
J024 2 7.4 Phone
J025 2 8.4 Computer
J026 1 8.4 Phone
J027 1 8.3 Phone
J028 1 8.3 Computer
J029 1 8.2 Phone
J030 2 8.2 Computer
J031 2 8.1 Phone
J032 1 8.1 Computer
J033 2 9.1 Phone
J034 1 9.1 Computer
J035 1 9.2 Phone
J036 1 9.2 Computer
J037 1 9.3 Phone
J038 1 9.3 Computer
J039 2 9.4 Phone
J040 1 9.4 Computer
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Franklin
Fiscal crisis & ManageMent assistance teaM
6677
aPPenddricaefsT
SITE BURLINGAME RACK BIS02RR01
INTER. PATCH PANEL P01
School
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 1 10.1 COMPUTER
J002 10.1 Not Used
J003 10.1 Not Used
J004 10.1 Not Used
J005 10.1 Not Used
J006 N/A
J007 10.1 Not Used
J008 10.1 Not Used
J009 10.1 Not Used
J010 10.1 Not Used
J011 1 10.1 PHONE
J012 10.1 Not Used
J013 N/A
J014 N/A
J015 N/A
J016 10.2 Not Used
J017 N/A
J018 N/A
J019 10.2 Not Used
J020 10.2 Not Used
J021 10.2 Not Used
J022 10.2 Not Used
J023 N/A
J024 1 10.2 PHONE
J025 10.2 Not Used
J026 10.2 Not Used
J027 10.2 Not Used
J028 1 10.2 COMPUTER
J029 10.2 Not Used
J030 10.2 Not Used
J031 1 10.3 PHONE
J032 1 10.3 COMPUTER
J033 10.3 Not Used
J034 1 10.3 COMPUTER
J035 10.3 Not Used
J036 10.3 Not Used
J037 1 10.3 Not Used
J038 1 10.3 Not Used
J039 10.3 Not Used
J040 10.3 Not Used
J041 10.3 Not Used
J042 10.3 Not Used
J043 1 10.4 PHONE
J044 10.4 Not Used
J045 10.4 Not Used
J046 1 10.4 COMPUTER
J047 10.4 Not Used
J048 10.4 Not Used
BurlingaMe school District
6688
darPPaefnTdices
SITE BURLINGAME IS RACK BIS02RR01
PATCH PANEL P02
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 10.4 Not Used
J002 10.4 Not Used
J003 10.4 Not Used
J004 1 10.4 PHONE
J005 N/A
J006 10.4 Not Used
J007 10.4 Not Used
J008 10.4 Not Used
J009 10.4 Not Used
J010 10.5 Not Used
J011 10.5 Not Used
J012 10.5 Not Used
J013 10.5 Not Used
J014 1 10.5 PHONE
J015 1 10.5 Computer
J016 10.5 Not Used
J017 10.5 Not Used
J018 10.5 Not Used
J019 10.5 Not Used
J020 10.5 Not Used
J021 10.5 Not Used
J022 N/A
J023 N/A
J024 N/A
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Fiscal crisis & ManageMent assistance teaM
6699
aPPenddricaefsT
Burlingame School District
Network Discovery Audit
SITE Franklin ES RACK FES01RR01
PATCH PANEL P01
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 2 RM.1 Phone
J002 2 RM.1 Computer
J003 2 RM.1 Not Used
J004 2 RM.1 Not Used
J005 2 RM.2 Phone
J006 2 RM.2 Computer
J007 2 RM.2 Not Used
J008 2 RM.2 Not Used
J009 2 RM.3 Computer
J010 2 RM.3 Phone
J011 2 RM.3 Not Used
J012 2 RM.3 Not Used
J013 2 RM.4 Computer
J014 2 RM.4 Phone
J015 2 RM.4 Not Used
J016 2 RM.4 Not Used
J017 2 RM.5 Not Used
J018 1 RM.5 Computer
J019 1 RM.5 Not Used
J020 1 RM.5 Not Used
J021 1 RM.6 Phone
J022 1 RM.6 Computer
J023 1 RM.6 Not Used
J024 1 RM.6 Not Used
J025 1 RM.7 Computer
J026 1 RM.7 Phone
J027 1 RM.7 Not Used
J028 1 RM.7 Not Used
J029 1 RM.8 Not Used
J030 1 RM.8 Phone
J031 1 RM.8 Computer
J032 1 RM.8 Not Used
J033 1 RM.9 Phone
J034 1 RM.9 Computer
J035 1 RM.9 Not Used
J036 1 RM.9 Not Used
J037 1 RM.10 Phone
J038 2 RM.10 Computer
J039 2 RM.10 Not Used
J040 2 RM.10 Not Used
J041 2 RM.11 Not Used
J042 2 RM.11 Not Used
J043 2 RM.11 Computer
J044 2 RM.11 Phone
J045 2 RM.12 Not Used
J046 2 RM.12 Phone
J047 2 RM.12 Computer
J048 2 RM.12 Not Used
Franklin
BurlingaMe school District
7700
darPPaefnTdices
SITE Franklin ES RACK FES02RR01
PATCH PANEL P01
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 1 29 Wireless
J002 N/A
J003 1 20 Phone
J004 1 20 Computer
J005 1 21 Not Used
J006 N/A
J007 1 21 Computer
J008 1 21 Phone
J009 1 22 Wireless
J010 1 22 Computer
J011 1 22 Phone
J012 1 22 NOT USED
J013 1 22 NOT USED
J014 N/A
J015 N/A
J016 N/A
J017 N/A
J018 N/A
J019 N/A
J020 N/A
J021 N/A
J022 N/A
J023 N/A
J024 N/A
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Fiscal crisis & ManageMent assistance teaM
7711
aPPenddricaefsT
SITE Franklin ES RACK FES01RR01
PATCH PANEL P02
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 2 RM.K Phone
J002 2 RM.K Computer
J003 2 RM.K Not Used
J004 2 RM.K Not Used
J005 2 RM.14 Phone
J006 2 RM.14 Computer
J007 2 RM.14 Not Used
J008 2 RM.14 Not Used
J009 2 RM.15 Computer
J010 2 RM.15 Phone
J011 2 RM.15 Not Used
J012 2 RM.15 Not Used
J013 2 RM.16 Computer
J014 2 RM.16 Phone
J015 2 RM.16 Not Used
J016 2 RM.16 Not Used
J017 2 RM.17 Not Used
J018 1 RM.17 Computer
J019 1 RM.17 Not Used
J020 1 RM.17 Not Used
J021 1 RM.18 Phone
J022 1 RM.18 Computer
J023 1 RM.18 Not Used
J024 1 RM.18 Not Used
J025 1 RM.19 Computer
J026 1 RM.19 Phone
J027 1 RM.19 Not Used
J028 1 RM.19 Not Used
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
BurlingaMe school District
7722
darPPaefnTdices
SITE Franklin ES RACK FES01RR01
PATCH PANEL P03
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 3 Comp lab/library computer
J002 3 Comp lab/library computer
J003 3 Comp lab/library computer
J004 3 Comp lab/library computer
J005 3 Comp lab/library computer
J006 3 Comp lab/library computer
J007 3 Comp lab/library computer
J008 3 Comp lab/library computer
J009 3 Comp lab/library computer
J010 3 Comp lab/library computer
J011 3 Comp lab/library computer
J012 3 Comp lab/library computer
J013 3 Comp lab/library computer
J014 3 Comp lab/library computer
J015 3 Comp lab/library computer
J016 3 Comp lab/library computer
J017 3 Comp lab/library computer
J018 3 Comp lab/library computer
J019 N/A
J020 N/A
J021 N/A
J022 N/A
J023 N/A
J024 N/A
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Fiscal crisis & ManageMent assistance teaM
7733
aPPenddricaefsT
SITE Franklin ES RACK FES01RR01
PATCH PANEL P04
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 3 Comp lab/library computer
J002 3 Comp lab/library computer
J003 3 Comp lab/library computer
J004 3 Comp lab/library computer
J005 3 Comp lab/library computer
J006 3 Comp lab/library computer
J007 3 Comp lab/library computer
J008 3 Comp lab/library computer
J009 3 Comp lab/library computer
J010 3 Comp lab/library computer
J011 3 Comp lab/library computer
J012 3 Comp lab/library computer
J013 3 Comp lab/library computer
J014 3 Comp lab/library computer
J015 3 Comp lab/library computer
J016 3 Comp lab/library computer
J017 3 Comp lab/library computer
J018 N/A
J019 N/A
J020 N/A
J021 N/A
J022 N/A
J023 N/A
J024 N/A
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
BurlingaMe school District
7744
darPPaefnTdices
PATCH PANEL P01
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 1 Rm.12 Computer
J002 1 Rm.12 Computer
J003 1 Rm.12 Computer
J004 3 Rm.12 Phone
J005 1 Rm.12 Printer
J006 1 Rm.12 Not Used
J007 1 Rm.12 Not Used
J008 1 Rm.12 Not Used
J009 1 Rm.11 Not Used
J010 1 Rm.11 Computer
J011 1 Rm.11 Computer
J012 2 Rm.11 Phone
J013 2 Rm.10 Phone
J014 1 Rm.10 Computer
J015 1 Rm.10 Computer
J016 1 Rm.10 Not Used
J017 2 Rm.09 Phone
J018 1 Rm.09 Computer
J019 Rm.09 Not Used
J020 1 Rm.09 Computer
J021 Rm.08 Not Used
J022 2 Rm.08 Phone
J023 2 Rm.08 Computer
J024 2 Rm.08 Phone
J025 1 Rm.07 Computer
J026 2 Rm.07 Phone
J027 Rm.07 Not Used
J028 1 Rm.07 Not Used
J029 2 Rm.06 Phone
J030 1 Rm.06 Computer
J031 Rm.06 Not Used
J032 Rm.06 Not Used
J033 2 Rm.15 Phone
J034 1 Rm.15 Computer
J035 1 Rm.15 Computer
J036 Rm.15 Not Used/ No Switch
J037 2 Rm. 14 Phone
J038 1 Rm. 14 Computer
J039 2 Rm. 14 Not Used
J040 2 Rm. 14 Not Used
J041 2 Rm.13 Phone
J042 1 Rm.13 Computer
J043 2 Rm.13 Not Used
J044 2 Rm.13 Not Used
J045 2 Rm.05 Not Used
J046 2 Rm.05 Computer
J047 2 Rm.05 Not Used
J048 2 Rm.05 Phone
Fiscal crisis & ManageMent assistance teaM
7755
aPPenddricaefsT
SITE Lincoln ES RACK LES01RR01
PATCH PANEL P02
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 2 Rm 4 Phone
J002 2 Rm 4 Not Used
J003 3 Rm 4 Not Used
J004 2 Rm 4 Computer
J005 2 Rm 3 Not Used
J006 2 Rm 3 Phone
J007 N/A
J008 2 Rm 3 Computer
J009 N/A
J010 3 Rm 2 Phone
J011 N/A
J012 3 Rm 2 Phone
J013 2 Rm 2 Computer
J014 N/A
J015 1 Rm 1 Phone
J016 2 Rm 1 Not Used
J017 2 Rm 1 Computer
J018
J019
J020 2 Rm k Computer
J021 N/A
J022 N/A
J023 N/A
J024 N/A
J025 N/A
J026 N/A
J027 2 Library Computer
J028 2 Library Computer
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
BurlingaMe school District
7766
darPPaefnTdices
SITE Lincoln ES RACK LES01RR01
PATCH PANEL P03
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 3 Library Printer
J002 2 Library Computer
J003 2 Library Computer
J004 2 Library Printer
J005 2 Library Phone
J006 2 Library Computer
J007 N/A
J008 N/A
J009 N/A
J010 N/A
J011 N/A
J012 3 RM K Going to a 66 block
J013 2 Office Phone
J014 1 Office Phone
J015 1 Office Computer
J016 1 Office Computer
J017 2 Office Phone
J018 N/A
J019 N/A
J020 N/A
J021 2 Office Phone
J022 2 Office Phone
J023 3 Office Phone
J024
J025 2 RM K Phone Going to 66 block
J026 RM K Not Used/ No Device/ No Switch
J027 RM K Not Used/ No Device/ No Switch
J028 RM K Not Used/ No Device/ No Switch
J029 3 RM K Computer
J030 3 RM K Computer
J031 3 RM K Not Used
J032 3 RM K Not Used
J033 3 Office Phone
J034 3 Book rm Not Used
J035 3 P.E. Phone
J036 N/A
J037 2 Music Rm Phone
J038 N/A
J039 3 MPR Not Used
J040 1 MPR Not Used
J041 1 Faculty Computer
J042 1 Faculty Phone
J043 2 Faculty Phone
J044 Faculty Not Used / No Switch
J045 Rm B Not Used / No Switch
J046 2 Rm B Phone
J047 2 Rm A Computer
J048 1 Rm A Computer
Note: N/A = Not Found
Fiscal crisis & ManageMent assistance teaM
7777
aPPenddricaefsT
SITE Lincoln ES RACK LES01RR01
PATCH PANEL P04
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 N/A
J002 N/A
J003 1 Library Feed 3 Feeds to LES01RR02
J004 1 Library Feed 4 Feeds to LES01RR03
J005 1 Library Feed 5 Feeds to LES01RR04
J006 1 Library Feed 3 Feeds to LES01RR05
J007 1 Library Feed 3 Feeds to LES01RR06
J008 1 Library Feed 3 Feeds to LES01RR07
J009 N/A
J010 N/A
J011 N/A
J012 N/A
J013 N/A
J014 N/A
J015 N/A
J016 N/A
J017 N/A
J018 N/A
J019 N/A
J020 N/A
J021 N/A
J022 N/A
J023 N/A
J024 2 Work room Phone
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
BurlingaMe school District
7788
darPPaefnTdices
Burlingame School DistrictNetwork Discovery Audit
SITE MCKINLEY ES RACK MES01RR01
PATCH PANEL P01
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 1 5 N/A
J002 1 5 N/A
J003 1 5 N/A
J004 1 5 N/A
J005 1 6 N/A
J006 1 6 N/A
J007 1 HALLWAY COMPUTER
J008 N/A
J009 1 6 N/A
J010 1 7 N/A
J011 1 7 N/A
J012 1 7 N/A
J013 1 7 N/A
J014 1 8 N/A
J015 8 N/A
J016 1 8 N/A
J017 1 9 WIRELESS
J018 1 9 N/A
J019 1 9 N/A
J020 N/A
J021 1 10 N/A
J022 1 10 N/A
J023 N/A
J024 1 11 N/A
J025 1 11 N/A
J026 1 11 N/A
J027 N/A
J028 1 13 N/A
J029 N/A
J030 1 15 N/A
J031 1 16 N/A
J032 N/A
J033 1 STUFF ROOM PHONE
J034 1 STUFF ROOM COMPUTER
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 1 PSYCHOLOGIST PHONE
J042 1 13 WIRELESS
J043 1 13 PHONE
J044 N/A
J045 1 BREAK ROOM PHONE
J046 1 9 WIRELESS
J047 1 9 WIRELESS
J048 1 9 WIRELESS
Franklin
Fiscal crisis & ManageMent assistance teaM
7799
aPPenddricaefsT
SITE MC KINLEY ES RACK MES02RR01
PATCH PANEL P01
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 N/A
J002 N/A
J003 N/A
J004 2 1 Phone
J005 2 1 Not Used
J006 2 1 Computer
J007 2 2 Phone
J008 2 2 Computer
J009 2 2 Not Used
J010 2 3 Phone
J011 2 3 Not Used
J012 2 3 Computer
J013 2 3 Not Used
J014 2 3 Not Used
J015 2 3 Not Used
J016 2 4 Phone
J017 2 4 Computer
J018 2 4 Not Used
J019 2 4 Not Used
J020 N/A
J021 N/A
J022 N/A
J023 N/A
J024 N/A
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
BurlingaMe school District
8800
darPPaefnTdices
Burlingame School District
Network Discovery Audit
SITE Roosevelt ES RACK RES01RR01
PATCH PANEL P02
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 N/A
J002 N/A
J003 N/A
J004 N/A
J005 N/A
J006 N/A
J007 2 8 Phone
J008 1 8 Computer
J009 N/A
J010 N/A
J011 N/A
J012 8 Not uesd
J013 N/A
J014 N/A
J015 N/A
J016 N/A
J017 N/A
J018 N/A
J019 N/A
J020 N/A
J021 1 1 Computer
J022 2 1 Phone
J023 1 Principal Off Computer
J024 2 Principal Off Phone
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 1 Copy Rm. Phone
J043 2 Copy Rm. Coputer
J044 1 Copy Rm. Not used
J045 N/A
J046 Break Rm. Computer
J047 Break Rm. Phone
J048 N/A
Franklin
Fiscal crisis & ManageMent assistance teaM
8811
aPPenddricaefsT
SITE Roosevelt ES RACK RES02RR01
PATCH PANEL PO1
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 2 5 Phone
J002 1 5 Computer
J003 N/A
J004 N/A
J005 2 7 Phone
J006 1 7 Computer
J007 N/A
J008 N/A
J009 2 5 Phone
J010 N/A
J011 1 7 Not Used
J012 N/A
J013 N/A
J014 N/A
J015 2 1 Phone
J016 1 1 Computer
J017 1 1 Not Used
J018 1 2 Computer
J019 2 2 Phone
J020 N/A
J021 1 3 Computer
J022 2 3 Phone
J023 1 3 Not Used
J024 2 4 Phone
J025 N/A
J026 2 4 Not Used
J027 2 Copier Room Phone
J028 N/A
J029 OFFICE N/A
J030 OFFICE N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
BurlingaMe school District
8822
darPPaefnTdices
SITE WASHINGTON RACK WES01RR01
ELEM. PATCH PANEL P01
School
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 1 23 Phone
J002 1 23 Computer
J003 1 22 Phone
J004 1 22 Computer
J005 1 21 Phone
J006 1 21 Computer
J007 1 20 Phone
J008 1 20 Computer
J009 N/A
J010 N/A
J011 N/A
J012 N/A
J013 N/A
J014 N/A
J015 N/A
J016 N/A
J017 N/A
J018 N/A
J019 N/A
J020 N/A
J021 N/A
J022 N/A
J023 N/A
J024 2 Work room Phone
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Note: N/A = Not found
Fiscal crisis & ManageMent assistance teaM
8833
aPPenddricaefsT
SITE WASHINGTON RACK WES01RR01
ELEM. PATCH PANEL P02
School
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J002 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J003 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J004 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J005 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J006 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J007 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J008 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J009 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J010 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J011 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J012 4 LIBRARY/ C.LAB COMPUTER MAC PC
J013 4 LIBRARY/ C.LAB COMPUTER MAC PC
J014 4 LIBRARY/ C.LAB COMPUTER MAC PC
J015 4 LIBRARY/ C.LAB COMPUTER MAC PC
J016 4 LIBRARY/ C.LAB COMPUTER MAC PC
J017 3 MPR Phone
J018 N/A
J019 N/A
J020 N/A
J021 N/A
J022 N/A
J023 1 MAIL RM COMPUTER
J024 1 OFFICE COMPUTER
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Note: N/A = Not Found
BurlingaMe school District
8844
darPPaefnTdices
SITE WASHINGTON RACK WES01RR01
ELEM. PATCH PANEL P03
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 1 3 Not Used
J002 N/A
J003 3 1 Not Used
J004 N/A
J005 1 1 Phone
J006 2 1 Computer
J007 N/A
J008 N/A
J009 1 3 Computer
J010 1 3 Phone
J011 1 4 Phone
J012 1 4 Computer
J013 1 4 Not Used
J014 1 4 Not Used
J015 N/A
J016 N/A
J017 N/A
J018 N/A
J019 N/A
J020 1 5 Phone
J021 1 5 Computer
J022 N/A
J023 N/A
J024 N/A
J025 1 Principal Computer
J026 3 Principal Phone
J027 1 Office Phone
J028 3 Office Computer
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Note: N/A = Not Found
Fiscal crisis & ManageMent assistance teaM
8855
aPPenddricaefsT
SITE WASHINGTON RACK WES01RR01
ELEM. PATCH PANEL P04
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 4 10A COMPUTER/HP HP COMP.
J002 4 STUFF LOUGE PHONE CISCO IP
J003 4 OUGE COMPUTER/HP HP COMP.
J004 4 10A COMPUTER/HP HP COMP.
J005 1 7 COMPUTER MAC PC
J006 2 7 COMPUTER MAC PC
J007 4 8 PHONE CISCO IP
J008 2 8 COMPUTER MAC PC
J009 2 8 Not Used
J010 1 9 COMPUTER MAC PC
J011 2 9 PHONE CISCO IP
J012 4 LIBRARY/ C.LAB COMPUTER MAC PC
J013 1 9A PHONE CISCO IP
J014 2 9A COMPUTER MAC PC
J015 2 9a Not Used
J016 1 10 PHONE CISCO IP
J017 2 10 COMPUTER
J018 2 10 Not Used
J019 1 11 PHONE CISCO IP
J020 2 11 COMPUTER MAC PC
J021 2 11 Not Used
J022 1 2nd floor AP
J023 2 2nd floor AP
J024 1 12 PHONE CISCO IP
J025 2 12 COMPUTER MC‐PC
J026 2 12 Not Used
J027 N/A
J028 1 13 PHONE ACKMAC PC
J029 3 13 Not Used
J030 3 13 N/A
J031 14 1 PHONE CISCO IP
J032 N/A
J033 14 2 Not Used
J034 N/A
J035 15 2 PHONE CISCO IP
J036 15 2 Not Used
J037 15 2 COMPUTER MAC PC
J038 3 2nd floor hallway LINKSYS 4 computers
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Note: N/A = Not Found
BurlingaMe school District
8866
darPPaefnTdices
SITE WASHINGTON RACK WES01RR01
ELEM. PATCH PANEL P05
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J002 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J003 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J004 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J005 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J006 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J007 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J008 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J009 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J010 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J011 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J012 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J013 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J014 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J015 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J016 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J017 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J018 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J019 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J020 N/A
J021 N/A
J022 N/A
J023 N/A
J024 N/A
J025 N/A
J026 N/A
J027 N/A
J028 N/A
J029 N/A
J030 N/A
J031 N/A
J032 N/A
J033 N/A
J034 N/A
J035 N/A
J036 N/A
J037 N/A
J038 N/A
J039 N/A
J040 N/A
J041 N/A
J042 N/A
J043 N/A
J044 N/A
J045 N/A
J046 N/A
J047 N/A
J048 N/A
Note: N/A = Not Found
Fiscal crisis & ManageMent assistance teaM
8877
aPPenddricaefsT
SITE WASHINGTON RACK WES01RR01
ELEM. PATCH PANEL P06
Connected to
Jack Pos DEVICE Remarks
SWITCH # ROOM #
J001 4 10A COMPUTER/HP HP COMP.
J002 2 STUFF LOUGE NOT USED
J003 4 STUFF LOUGE COMPUTER
J004 10A NOT USED
J005 1 7 COMPUTER MAC PC
J006 2 7 COMPUTER MAC PC
J007 4 8 PHONE CISCO IP
J008 2 8 COMPUTER MAC PC
J009 2 8 NOT USED
J010 1 9 COMPUTER MAC PC
J011 4 LIBRARY/ C.LAB COMPUTER/HP HP COMP.
J012 1 LIBRARY/ C.LAB COMPUTER MAC PC
J013 2 LIBRARY/ C.LAB COMPUTER
J014 1 LIBRARY/ C.LAB COMPUTER MAC PC
J015 LIBRARY/ C.LAB NOT USED
J016 2 LIBRARY/ C.LAB PRINTER
J017 1 LIBRARY/ C.LAB PRINTER
J018 2 10 NOT USED
J019 1 11 PHONE CISCO IP
J020 2 11 COMPUTER MAC PC
J021 2 11 NOT USED
J022 N/A
J023 N/A
J024 3 MPR PHONE CISCO IP
J025 1 MPR COMPUTER MC‐PC
J026 1 MPR COMPUTER
J027 1 MPR NOT USED
J028 N/A
J029 1 MPR COMPUTER
J030 1 MPR COMPUTER
J031 2 WORK RM COMPUTER
J032 WORK RM NOT USED
J033 N/A
J034 WORK RM NOT USED
J035 OFFICE NOT USED
J036 HALLWAY NOT USED
J037 HALLWAY NOT USED
J038 HALLWAY NOT USED
J039
J040
J041
J042
J043
J044
J045
J046
J047
J048
BurlingaMe school District
8888
darPPaefnTdices
Appendix G
Advanced Data Communications
Network Discovery Audit Findings and Recommendations
BURLINGAME INTERMEDIATE SCHOOL
NETWORK DISCOVERY AUDIT
BURLINGAME SCHOOL DISTRICT (DO)
Findings:
• IDF/MDF is not in a secured closed room
• No labels on the patch panel, cables, faceplates, jacks
• Cable are Cat5 and Cat5e
• Cables coming from the location going to IDF is plugged in directly to switch
Recommendations:
• Provide a secure area for the IDF. It must be closed to control environment, security
• Old /abandoned cables must be removed from walls, IDF rack or closet and pathway for
safety and not hazardous
• All patch panel must have labels including jack and cables for easy locating of data drops or
station working on
• Cables coming from the work station should be punched into a patch panel
• Floor plan should be always in hand or should be mounted at the IDF to more quickly locate
the station
BURLINGAME INTERMEDIATE SCHOOL (BIS)
Findings:
• IDF/MDF is not in a secured closed room
• Switches are only inside the closet not in the rack or enclosed box
• No labels on the patch panel, cables, faceplates, jacks
• Some cables are too long of a run
• Some cables are run straight to switch
• Cables are being pinched on the pathway by zip ties
• Some IDF are in attic space and closet
Fiscal crisis & ManageMent assistance teaM
8899
aPPenddricaefsT
• Pathway or wire mold used at computer lab was too narrow so cables are being pinched
• MDF fiber panels are located in the wall
Recommendations:
• Provide a secure area for the IDF. It must be closed and secured in a controlled environment
• Old/abandoned cables must be removed from walls, IDF rack, closet and pathway for safety.
This will limit fire hazard
• Uplink/backbone from IDF to MDF must be fiber for higher bandwidth
• Upgrade cables to Cat6 or higher for better performance
• Use Velcro to bundle cable
• MDF/IDF fiber panel should be mounted on the rack with the patch panels and switch
• Network components should be consolidated in same rack
• Wire mold and surface mount box should be screwed into the wall
FRANKLIN ELEMENTARY SCHOOL (FES)
Findings:
• IDF/MDF is not in a secured, closed room
• No labels on the patch panel, cables, faceplates, jacks
• Cables are Cat5 and Cat5e. Indoor cable was used for outside. Hence, some cables are
deteriorating and getting loose connections
• Cables are more than the standard length (298 ft.)
• Cable coming from the location going to IDF is plugged in directly to switch
• IDF was warm and there is no vent to cool the area
• Materials used on pathways are not to code
Recommendations:
• Provide a secure area for the IDF. It must be closed to control environment, security
• Old /abandoned cables must be removed from walls, IDF rack or closet and pathway for
safety and more space for new cables
• All patch panels must have labels including jack and cables to easily locate data drops or work
on station
• Cables coming from the workstation should be punched into a patch panel
• Floor plan should be always in hand or mounted at the IDF to quickly locate the station
BurlingaMe school District
9900
darPPaefnTdices
• Proper pathway materials should be used such as pipes and wire mold for indoor and wire
management
LINCOLN ELEMENTARY SCHOOL (LES)
Findings:
• IDF/MDF is not in a secured closed room
• Switches are only inside the closet not in the rack or enclosed box
• Patch panels are in two different locations. Some are in the wall.
• No labels on the patch panel, cables, faceplates, jacks
• Some cables are too long of a run
• Some cables are run straight to switch
• Cables are being pinched on the pathway by zip ties
Recommendations:
• Provide a secure area for the IDF. It must be closed to control environment, security
• Old /abandoned cables must be removed from walls, IDF rack or closet and pathway for
safety and more space for new cables
• All patch panels must have labels including jack and cables to easily locate data drops or work
on station
• Uplink/backbone from IDF to MDF must be fiber for higher bandwidth
• Upgrade cables to Cat6 for better quality
• Use Velcro to bundle cables
McKINLEY ELEMENTARY SCHOOL (MES)
Findings:
• IDF/MDF is not in a secured, closed room
• Switches are only inside the closet, not in the rack or enclosed box
• Patch panels are in two different locations. Some are in the wall.
• No labels on the patch panels, cables, faceplates, jacks
• Network components such as patch panel, switch, fiber panel are not organized in standard
positions
• IDFs are in a warm area like attic
• Cables are still in CAT5 and CAT5e
Fiscal crisis & ManageMent assistance teaM
9911
aPPenddricaefsT
• Copper link from IDF to IDF
Recommendations:
• Provide a secure area for the IDF. It must be closed to control environment, security
• Old /abandoned cables must be removed from walls, IDF rack, closet and pathway for safety.
This will limit fire hazard.
• Uplink/backbone from IDF to MDF must be fiber for higher bandwidth
• Upgrade cables to Cat6 or higher for better performance
ROOSEVELT ELEMENTARY SCHOOL (RES)
Findings:
• No labels on the patch panel, cables, faceplates, jacks
• Some cables are too long of a run
• No MAP on ID
Recommendations:
• Map or floor plan is needed at IDF side
• Cables should be standard length
WASHINGTON ELEMENTARY SCHOOL (WES)
Findings:
• IDF/MDF is not in a secured, closed room
• Patch panels are in two different locations; some are in the wall
• Network components such as patch panel, switch, fiber panel are not organized in standard
positions
• Old cables are still in rack and behind some of the wall plates
• No labels on the patch panels, cables, face plates, jacks
• Some cables are CAT5, some are CAT5e
Recommendations:
• Provide a secure area for the IDF. It must be closed to control environment, security
• Old /abandoned cables must be removed from walls, IDF rack or closet and pathway for
safety
BurlingaMe school District
9922
darPPaefnTdices
• Rack must be assembled in an organized manner to have a better flow of cables and make it
easier to find ports or jack
• All patch panels must have labels including jack and cables to easily locate data drops or work
on station
Fiscal crisis & ManageMent assistance teaM
9933
aPPenddricaefsT
appendix H
sample district
disaster recovery Plan
The following pages outline the recovery process for the ABC School District
**this document must be kept in paper form by the **
**emergency recovery team**
BurlingaMe school District
9944
darPPaefnTdices
1. introduction
Planning for the business continuity of the ABC School District in the aftermath
of a disaster is a complex task. Preparation for, response to, and recovery from a
disaster affecting the administration functions of the school district requires the
cooperative efforts of many support organizations in partnership with the functional
areas supporting the “business” of ABC School District. This document records the
Plan that outlines and coordinates these efforts.
For use in the event of a disaster, this document identifies the computer recovery
facilities (hot sites) that have been designated as backups if the functional areas
are disabled.
1.1 definiTion of adMinisTraTion funcTions
The following administrative functions are addressed by this plan:
• Payroll records and processing (description)
• Accounting records and processing (description)
• Student records and processing? (description)
• Equipment Inventory records and processing (description)
• District office processes (description)
• School building office processes? (description)
• Other
2. district responsibilities
The following information outlines the responsibilities of the ABC School District.
2.1 off siTe sToraGe of daTa and sysTeM Media
What is stored; where it is stored; how often, by whom and how (physically
moving tapes, backed-up over network, or other)
What? For example: payroll records, accounting records, invoicing records,
equipment inventory records, board minutes, policy manuals, insurance
policies, personnel records, county/auditor records, disaster recovery
procedure, software application disks, hardware configuration disks, etc….
Some are hard copies, others are soft. (What about school building office
records? Student records, …)
Fiscal crisis & ManageMent assistance teaM
9955
aPPenddricaefsT
Where? For example: at a remote school building; maybe reciprocal agreement
with another district; regional agency
How often? Hard copies can be kept remotely and their existence verified
quarterly through a simple written procedure. Soft copies which change often
may be backed up once a week (or however often is determined locally) and
moved to an off-site location as explained above, or just backed up over a
network connection.
How long? LACA keeps copies of back-ups indefinitely (how far back can
records truly be retrieved?) Legal requirements need to be researched.
By whom? Important to designate person/organization responsible
How? Tape media, hard copy, on-line accessible, microfiche, CD, etc…
2.2 on siTe sToraGe of daTa and sysTeM Media
Define what is stored on site and how it is stored. i.e. Board minutes stored
in fire-proof safe box, local district files stored on a local server, etc., paper
documents stored in a filing cabinet, etc. Continue items from 2.1
2.3 definiTion of sysTeM(s)
Define the equipment, software, installation procedures and configurations,
supplies and telecommunications necessary for all administrative operations.
Example: printing checks, direct deposit slips, purchase orders…
Wiring direct deposit
Client software/setup
2.4 define TeaMs and resPonsibiliTies of eacH
Define the following teams and responsibilities in the event of a disaster:
data Team:
• Coordinates support for data processing resources at the main data
center and designated recovery sites
communications Team:
• Alternate voice and data communications capability
• News Media
BurlingaMe school District
9966
darPPaefnTdices
• Human Resources elements of recovery and notify staff
insurance Team:
• Physical plant – security, electrical, plumbing
• Liaison for insurance carriers
3. diasasTer recovery services
3.1 disasTer recovery services
As a member of the Licking Area Computer Association (LACA), the ABC
School District automatically receives disaster recovery services from the
organization.
LACA maintains two computer labs where access is available to all software
applications/data contracted by the ABC School District.
It is the responsibility of ABC School District to outline all system definitions
in section 2.3 and verify functionality with LACA and/or the school district “hot
sites”.
3.2 disasTer reciProcal aGreeMenT: (“HoT siTe”)
The ABC school district has an agreement with all other member school
districts of LACA (or pick one partnership district?) located in Licking and
Muskingum Counties, Ohio.
This agreement stipulates that, in case of a disaster (where the computer
equipment at our location is out of service), our users may have access to
computers at the functioning locations so that our necessary district business
processes may be performed.
NOTE
These arrangements are solely for the purpose of recovering business
functionality in the event of a disaster, and are not intended for daily use by the
non-functioning users.
LACA and the ABC School District Data Team will work cooperatively to make
all the necessary arrangements in order to schedule those school districts
users requesting services.
Fiscal crisis & ManageMent assistance teaM
9977
aPPenddricaefsT
4. PrioriTy usaGe lisT of “HoT siTe” usaGe
The following information outlines the priority in which users affected by the
“disaster” may have access to the designated “hot site”.
Define:
Critical Functions: immediate need (ex: bi-weekly payroll)
Essential Functions: what and how often (ex: accounting checks
once a month)
Necessary Functions: what and how often
Desirable Functions: what and how often
**Sample plan:
1. Those users required to process payroll will be given priority over all
other users.
2. Normal financial daily operations such as p/o, receipt, and check pro-
cessing will be allowed access to the “hot site” on a bi-weekly basis.
Student Services:
a. Grade reporting will be given priority over all other student
services operations;
b. Attendance, and other reports will be allowed access to the
“hot site” on a bi-weekly basis.
3. All other non-essential operations will cease until normal operations
are restored.
5. recovery Plan
In the event of a disaster, the (specified district staff) will organize the disaster
teams per Appendix A (and section 2.4) and implement the assignment of recovery
tasks to the disaster team.
The following recovery plan will be implemented and followed until computer
services normally provided by the district office are restored.
1. Define a central point of contact (disaster phone number will be established)
and a record of all inbound/outbound calls will be made. (Communications
Team)
BurlingaMe school District
9988
darPPaefnTdices
2. Assess damage to hardware, software, and site. (Insurance Team)
3. Notify appropriate district staff with instructions, appropriate support agen-
cies, i.e. LACA, LCESC, COSERC, ODE…. (Communications Team)
4. “Hot sites” will be notified of the situation and request made to implement
this recovery plan. (Data Team)
5. All data media containing the necessary files, will be gathered from the off-
site storage facilities (tapes, etc..) and steps followed per Appendix D: (Data
Team)
a. Latest “DAILY” backup (the most recent daily backup of the working
week). Local servers
b. Latest WEEKLY copy (and one week prior copy). Local servers
c. Latest copy of all software.
6. Those users requesting services as outlined in Section 3 will notify the S.D.
disaster phone number of their needs. S.D. will make arrangements with the
“hot sites” to see that the requesting user has access available with them
and to insure that the data files are then loaded (through LACA or local dis-
trict) if not already available. (Data Team)
7. S.D. will maintain a staff member at a location convenient with the “hot site”
to help the non-functioning district users. (Communications Team)
8. Necessary vendors and insurance companies are notified per Appendix B.
(Insurance Team)
9. Backups are run at the “hot site” for those districts that have been utilizing
the system. These are then stored as per outlined in Section 2.1. local serv-
ers (Data Team) 10. S.D. will publish a monthly schedule ensuring priority
and equal biweekly shared access to the “hot site” and remote access loca-
tions. (Communications Team)
Fiscal crisis & ManageMent assistance teaM
9999
aPPenddricaefsT
10. A new/repaired facility has been established and/or new equipment installed
for school district operation. (Insurance Team)
11. All user files are brought up-to-date with the latest backup copies. Local
servers (Data Team)
12. Users are notified of the location and hours of operation of the reinstalled,
operational S.D. (Communications Team)
NOTE
Pending “hot site” and LACA approval, district personnel who wish to access the “hot
site” through their own ISP connection may contact the S.D. Disaster phone number
for assistance.
APPENDIX A
School Contact Personnel
name Position emergency Team
contact number
Superintendent Home:
Cell:
Assistant Home:
Superintendent Cell:
Assistant Home:
Superintendent Cell:
Director of Home:
Technology Cell:
Etc…..
BurlingaMe school District
110000
darPPaefnTdices
APPENDIX B
CONTACT LIST - Vendors
Emergency Site – ABC School District
Banks
Software
Hardware (Servers, Computers/Workstations, Printers, Copiers, etc.)
Cisco Systems, Inc. (Network equipment)
Telecommunications (phones, cell phones, etc.)
Insurance Company
State Department of Education
Supplies (office, special forms, printer cartridges, etc.)
SERS
OBES
APPENDIX C
List of School Districts/Emergency Contacts
The Following pages list the Organizations/School Districts that partnership with/
support the ABC School District.
agency contact Person contact information
Fiscal crisis & ManageMent assistance teaM
110011
aPPenddricaefsT
APPENDIX D
Steps for Recovering our Data
APPENDIX E
Detailed Equipment Inventory of District Buildings
APPENDIX F
Detailed Network Diagrams (network equipment/wiring)
APPENDIX G
Additional Backup and Recovery for On-Site Servers
BurlingaMe school District
110022
darPPaefnTdices
appendix i
Fiscal crisis & ManageMent assistance teaM
110033
aPPenddricaefsT
BurlingaMe school District
110044
darPPaefnTdices
Fiscal crisis & ManageMent assistance teaM
110055
aPPenddricaefsT
BurlingaMe school District
110066
darPPaefnTdices
Fiscal crisis & ManageMent assistance teaM