FCMAT
Comprehensive Review
Read the report at Compton Unified School District ↗
SERNA v EASTIN CONSENT DECREE
Introduction
This report dated February 2006 is the fourteenth in a series of continuing six-month progress re-
ports assessing the efforts made by the Compton Unified School District to continually improve
the district’s operations. FCMAT has been involved in the Compton Unified School District from
1998 through the end of 2001 through Assembly Bill 52 legislation, and from February 2000
to the present through the Serna v Eastin Consent Decree. Both the AB 52 legislation and the
Consent Decree required FCMAT to monitor and report on the district’s progress at six-month
intervals.
As a requirement of AB 52, FCMAT conducted a comprehensive assessment of the district in
1998 in five major areas of school district operations and developed a recovery plan for the
district to implement. The Compton Unified School District Assessment and Recovery Plan
was distributed to the district in February 1999. FCMAT has issued six-month progress reports
beginning in August 1999 on the district’s efforts to meet the criteria for the return of governing
board authority developed through the AB 52 legislation. In addition, beginning with the August
2000 six-month progress report, the FCMAT progress reports also monitored and reported on
the district’s efforts to comply with the stipulations of the Serna v Eastin Consent Decree. As the
criteria for the return of powers to the governing board under AB 52 were fully met in Decem-
ber 2001, this is the ninth six-month progress report that addresses only the district’s progress in
fulfilling the stipulations of the Consent Decree.
The district has complied with all but one of the requirements for termination of the Serna v
Eastin Consent Decree. The full implementation of the district’s Facilities Master Plan, the only
Consent Decree stipulation not yet fully met, requires additional time to complete as the Facili-
ties Plan identifies numerous facilities modernization and construction projects the district plans
to address. As all other Consent Decree stipulations were met some time ago, the six-month
progress reports are repetitive, continuing to report that the district has met, and continues to
comply with, the requirements of the Consent Decree.
Early Disengagement Proposal
As the district has made significant progress in meeting all but the one remaining stipulation of
the Consent Decree, and as the implementation of the district’s Facilities Master Plan may take
several more years to be fully met, discussion was initiated in December 2005 among the Comp-
ton USD administrators, ACLU and FCMAT to consider alternate criteria for the possible earlier
disengagement of the parties to the Consent Decree.
A proposal under consideration identifies ten standards from the improvement plan developed for
the district in 1999 in each of the five major areas of district operations: Community Relations/
Governance, Personnel Management, Pupil Achievement, Financial Management and Facilities
Management. Under the proposal the district would be required to meet a minimum average rat-
ing for the ten standards in each of the areas, with no standard scoring below a five on a scale of
one (not implemented) to ten (fully implemented and sustained). Consideration and discussion
of this proposal to ensure the district continues to be effectively governed and operated is con-
tinuing as of this writing. Any modifications to the Consent Decree will be reported in the next
six-month progress report.
Executive Summary
Continuing Concerns
Although the district has made significant progress in the eight years that FCMAT has monitored
and reported on the district’s improvement efforts, the six-month progress reports of August
2004, February and August 2005 reported concerns about two areas of the district’s operations:
board governance and the inappropriate behaviors of a few board members, and the continuity of
effective leadership in the district.
Board Governance
The board election in November 2003 filled six open seats on the seven-member board with
three new board members and three returning members. Of the three returning members, one
was an incumbent and two were members of previous Compton USD boards. The August 2004,
February and August 2005 FCMAT reports indicated that some members of the board seated
in December 2003 did not demonstrate the same commitment to address the stipulations of the
Consent Decree as members of previous boards. Some board members also did not demonstrate
behaviors consistent with effective boardsmanship, such as berating staff at public meetings, not
supporting the district’s efforts to comply with the Consent Decree, and by declining to act in a
timely manner on facilities issues that might have affected state funding. Although the district
board approved the Facilities Master Plan in July 1999 and the Facilities Implementation Plan in
August 2001, some of the recently seated board members did not demonstrate a commitment to
implement the Facilities Master Plan as required by the Consent Decree.
The board election in November 2005 filled four open seats with two returning incumbents and
two first-time board members, as two other incumbents declined to seek reelection. The new
board held its reorganization meeting in December 2005, and all board members attended a
board retreat in early January to better understand their roles and the district’s fiscal position. It
is hoped that the newly seated board will exercise governance more appropriately than the previ-
ous board.
Continuity of Effective District Leadership
In August 2004 FCMAT reported that a board member told several cabinet members that they
were going to lose their jobs, and over the next year, the make-up of the superintendent’s cabinet
was significantly altered. The board in July 2004 terminated the employment of the Assistant
Superintendent of Administrative Services. The board in June 2005 refused to support the super-
intendent’s recommendation to extend the employment contract for the Deputy Superintendent.
The previous board did not support the superintendent in his efforts to acquire and retain the
most competent individuals for his cabinet, making it difficult for the superintendent to maintain
the district’s continued improvement. The progress made by the district to return to local gov-
ernance, repay the state loan, and to meet all but one of the stipulations of the Consent Decree
is the direct result of the efforts of the superintendent, his previous cabinet and members of the
district staff. Acquiring and maintaining competent leadership for the district is critical to the
district’s continued progress.
The newly seated Compton governing board will hopefully allay the concerns surfaced in the
2004 and 2005 FCMAT reports by providing the necessary policy direction for the district and
refraining from attempting to administer the district. As these continuing concerns affect the
effective operations of the district, any modification to the Consent Decree criteria will report on
progress made in these areas.
Executive Summary
Background of FCMAT's Involvement Regarding the Consent Decree
In July 1997, the ACLU and the attorneys for the Plaintiffs filed a class action lawsuit against the
State Department of Education in the Los Angeles Superior Court. This lawsuit (Serna v Eastin,
Case No. BC 174282) claimed that the children attending public schools in the Compton Unified
School District were deprived of basic educational opportunities that were available to children
elsewhere in California.
The judgment approving the Consent Decree in the above-entitled action was entered on Febru-
ary 7, 2000. The Consent Decree requires continued improvement in the district’s school facili-
ties/sites and the classroom environment. Some of the specific areas of concern that require atten-
tion under the Consent Decree include the availability of certificated teachers in every classroom,
the availability of appropriate textbooks and instructional materials for students to take home, the
condition of student restrooms, the timely removal of litter and graffiti, and the repair/replace-
ment of any faulty electrical wiring.
FCMAT was appointed by the parties to the lawsuit to oversee compliance with the stipulations
of the Consent Decree. The parties were aware that FCMAT was then engaged in monitoring the
progress of the Compton Unified School District in the implementation of recovery plans in the
areas of Pupil Achievement, Financial Management, Personnel Management, Facilities Manage-
ment and Community Relations as part of the requirements of Assembly Bill 52. The parties
agreed to make parts of the Compton USD recovery plans developed by FCMAT a part of the
Consent Decree and subject to the compliance requirements of the Consent Decree.
The Consent Decree identified specific standards among the legal and professional standards
developed by FCMAT in the operational areas of Pupil Achievement and Facilities Management
that required additional attention by the district. These identified standards were required by the
Consent Decree to meet a rating of 8 or better (on a scale of 1 to 10) in order for the standard to
be determined to be implemented and sustained. These specific standards have been reviewed
and their implementation progress reported during each of FCMAT’s monitoring visits and six-
month progress reports since August 2000. The court’s action placed FCMAT in a monitoring
role and required FCMAT to prepare semiannual reports on the defendants’ progress in comply-
ing with the requirements of the decree.
FCMAT’s third, fourth and fifth six-month progress reports in August 2000, February 2001, and
August 2001 responded to the monitoring requirements of both AB 52 and the Consent Decree.
In the August 2001 progress report, FCMAT reported that the Compton Unified School District
met the requirements for return of governing authority to the CUSD Governing Board under AB
52. The State Superintendent of Public Instruction formally returned governing authority to the
CUSD board in an executive order dated September 11, 2001, and effective December 11, 2001.
The six-month progress reports, beginning with the February 2002 report, provided FCMAT’s
review only of those standards and stipulations identified in the Consent Decree. The subsequent
reports issued in August 2002, February 2003, August 2003, February 2004, August 2004, Febru-
ary 2005, August 2005, and this February 2006 report continue to provide a review of only those
standards and stipulations identified in the Consent Decree.
Executive Summary
FCMAT meets with the counsel for the plaintiffs and defendants every 60 days as required by the
Consent Decree. The following is a record of these meetings.
• Three meetings were held prior to the third six-month progress report in August 2000 to
discuss process, responsibilities, and progress relative to the Consent Decree. The August
2000 progress report represented the first FCMAT document addressing the stipulations of
the Consent Decree.
• Two meetings and two random school site visitations were conducted between September
and February, prior to the fourth six-month progress report in February 2001.
• Four meetings and a random school site visitation were conducted between March and
August, prior to the fifth six-month progress report in August 2001.
• Three meetings and a random school site visitation were conducted between September
and February, prior to the sixth six-month progress report in February 2002.
• Three meetings and a random school site visitation were conducted between March and
August, prior to the seventh six-month progress report in August 2002.
• Two meetings and a random site visitation were conducted between September and
February, prior to the eighth six-month progress report in February 2003.
• Three meetings and a random site visitation were conducted between March and August,
prior to the ninth six-month progress report in August 2003.
• Three meetings and a random site visitation were conducted between September and
February, prior to the tenth six-month progress report in February 2004.
• Three meetings and a random site visitation were conducted between March and August,
prior to the eleventh six-month progress report in August 2004.
• Two meetings and a random site visitation were conducted between September and
February, prior to the twelfth six-month progress report in February 2005.
• Three meetings and a random site visitation were conducted between March and August,
prior to the thirteenth six-month progress report in August 2005.
• Three meetings were conducted between September and February, prior to the fourteenth
six-month progress report in February 2006.
The Compton Unified School District continues its progress under the Consent Decree. All Con-
sent Decree stipulations but one have been met.
Executive Summary
Meeting Consent Decree Compliance Requirements
Section 50 of Part VII. Termination of Consent Decree indicates the following:
50. This Consent Decree shall terminate upon the certification by FCMAT of each of the fol-
lowing:
a. Defendants have complied with Sections 1-24 of this Consent Decree.
b. Defendants have implemented the facilities plan required by Section 25(a).
c. Defendants have met the scaled scores for the Pupil Achievement recovery plan
and Facilities recovery plan as required by paragraph 25(b)(i).
Section 50 (a):
The Consent Decree delineates 18 sections of stipulations (Sections 7-24) that the district must
address to reach compliance. Sections 1-6 of the Consent Decree refer to definitions and general
provisions. The district is fully complying with the required stipulations of the 18 sections (Sec-
tions 7-24) of the Consent Decree. A summary of the district’s efforts to comply with each of
these stipulations follows on the next several pages of this report.
FCMAT certifies that the district has complied with Sections 1-24 of the Consent Decree.
Section 50 (b):
To implement the facilities plan required in Section 25(a), the district continues to use all avail-
able resources to address the district’s facilities needs identified in the Facilities Master Plan.
All facilities projects undertaken by the district are based on the needs identified in the district’s
comprehensive Facilities Master Plan.
The district approved a Certificate of Participation (COP) in June 2002 to obtain the necessary
funds to build a new K-5 elementary school. The William Jefferson Clinton Elementary School
was opened to students on January 27, 2003 as scheduled.
The district successfully passed a local $80 million General Obligation Bond (GOB) in Novem-
ber 2002 with a voter approval rate of 83%. The GOB Measure I enabled the district to imple-
ment the projects identified in the Facilities Master Plan and provided funds to retire the COP for
Clinton Elementary School. The project priorities for the GOB funds were based on the projects
identified in the district’s comprehensive Facilities Master Plan. A general obligation bond
oversight committee was established to oversee the appropriate use of Measure I funds for the
district’s modernization and construction projects.
The district instituted an aggressive facilities modernization effort to fully implement the dis-
trict’s comprehensive facilities plan. Full implementation will require more time to complete.
The monitoring of the district’s progress in implementing the Facilities Master plan will con-
tinue.
Section 50 (c):
Section 25 (b)(i) of the Consent Decree identifies 30 standards of the 104 FCMAT legal and
professional standards for Facilities Management, and 14 standards of the 38 FCMAT legal and
professional standards for Pupil Achievement that must reach a rating of 8, on a scale of 1-10,
to attain compliance. Also, all Facilities Management and all Pupil Achievement standards must
reach an average rating of 7.5. The Consent Decree reads in part as follows:
Executive Summary
Section 25.b.: The standards of the Pupil Achievement recovery plan and Facilities recovery plan
are made a part of this Consent Decree and shall be subject to the compliance requirements of
this Consent Decree.
25.b.i.: A list of standards for the Pupil Achievement recovery plan and Facilities recov-
ery plan, including the current scaled scores is set forth in Exhibit ‘A’ attached hereto and incor-
porated by reference. Any standard that has a scaled score of 8, 9, or 10 shall be deemed to have
been implemented. Any standard that has a scaled score of less than 8 shall be addressed and
improved by defendants. Compliance with a recovery plan’s standards shall be deemed satisfied
when FCMAT certifies that defendants have achieved an average scaled score for all such stan-
dards of 7.5 and no standard has received a scaled score of less than 4. In addition, compliance
shall not be deemed achieved unless the following standards have received a score of at least 8:
1) Pupil Achievement: 1.2; 1.4; 1.5; 1.10; 1.11; 1.16; 1.20; 1.21; 1.23; 1.25; 2.3; 2.6;
2.9; 2.10
2) Facilities: 1.3; 1.6; 1.7; 1.8; 1.9; 1.12; 1.14; 1.17; 2.1; 2.3; 2.4; 2.5; 2.6; 3.4; 3.8;
3.10; 6.2; 6.3; 8.5; 8.6; 8.8; 8.9; 8.10; 8.12; 9.3; 9.4; 9.7; 9.8; 9.10; 9.11.
In Pupil Achievement, the current average rating of all Pupil Achievement standards at this
six-month reporting period is 8.55, exceeding the 7.5 required average rating stipulated by the
Consent Decree. No standards have a scaled score of less than 4. All of the 14 identified Pupil
Achievement standards have reached a rating of 8 or better as required. Full compliance has been
reached in the operational area of Pupil Achievement.
In Facilities Management, the current average rating of all Facilities Management standards at
this six-month reporting period is 9.14, exceeding the 7.5 required average rating stipulated by
the Consent Decree. No standards have a scaled score of less than 4. All thirty identified Facili-
ties Management standards have reached a rating of 8 or better as required. Full compliance has
been reached in the operational area of Facilities Management.
FCMAT certifies that the district has met the required scaled scores in all of the standards for the
Pupil Achievement and Facilities recovery plans as required by paragraph 25(b)(i).
Compliance Summary
The district has met all of the requirements for termination of Sections 50 (a) and (c) of the Con-
sent Decree. The implementation of the Comprehensive Facilities Plan, as required in Section 50
(b) for termination of the Consent Decree, continues to require additional time to complete.
The state passed a General Obligation Bond, Proposition 47, in November 2002. The district also
passed a local $80 million General Obligation Bond, Measure I, in November 2002 to support its
share of the facilities projects. The state and local bond funds have enabled the district to imple-
ment the Comprehensive Facilities Master Plan as required in Section 50 (b). The district initi-
ated an aggressive construction program to complete the 28 modernization and 3 new construc-
tion projects that had long been state-approved and awaiting available funding. The district used
general funds and deferred maintenance funds to address the district’s most pressing facilities
issues prior to the successful passage of the state and local bonds. All of the district’s moderniza-
tion projects are expected to be completed by summer 2006.
Executive Summary
Summary of Findings and Recommendations Related to the Consent
Decree
FCMAT was appointed by the parties to oversee compliance with the Serna v Eastin Consent
Decree. This section provides the reader with FCMAT’s summary of the findings and
recommendations related to Sections 7-25 of the Consent Decree. Many of the FCMAT standards
for Pupil Achievement and Facilities Management address the concerns raised in Sections 7-25
of the Consent Decree. A more detailed review of these standards can be found elsewhere in this
report.
Consent Decree Stipulations Related to Pupil Achievement
There are several stipulations within the Consent Decree that relate to and affect pupil achieve-
ment. These stipulations include: Availability of Textbooks, Presence of Certificated Teachers,
Employee Absenteeism, Established Homework Policy, Retention and Promotion Policy, Passing
of CBEST, and Race Relations. Several FCMAT standards in the Pupil Achievement operational
area are also affected by an additional compliance requirement of needing to reach a rating of 8
(on a scale of 1-10) to be deemed compliant. These specific standards are listed in the chart of
standards in the Pupil Achievement section of this report.
Consent Decree Section 8 (Textbooks)
The requirements of Section 8 have been met by the district. The district has implemented the
Williams protocols for 2005-06 and 2006-07 and has ordered sufficient quantities of textbooks in
the core areas of English, Mathematics, History/Social Science, and Science to issue a textbook
from each core subject to each student. Standards based textbooks are adopted following the
state adoption schedule and several adoption cycles have occurred since monitoring was initi-
ated. Standards-based Curriculum Guides have been developed for the core subject areas. The
district annually prepares an inventory of all existing textbooks, monitors textbook returns and
losses, seeks restitution for lost textbooks, and replaces lost copies annually. (See related Pupil
Achievement Standard 1.25 – Current Rating:10. Standard 1.25 was required to reach an 8.)
Consent Decree Section 11 (Presence of Certificated Teachers)
The requirements of Section 11 have been met by the district. The district works to ensure that
certificated teachers are present in each classroom each day. Efforts continue to be made by the
district to increase the substitute list. The district attempts to maintain a list of certificated substi-
tutes in sufficient numbers to meet teacher absences. The principals have assumed responsibil-
ity for ensuring that children receive appropriate instruction from a certificated teacher on staff.
Other certificated site staff (counselor, resource teacher, administrator) must substitute if quali-
fied substitutes are not available at the site. (See related Personnel Management Standard 8.2
– Current Rating: 10. Standard 8.2 was not required to reach an 8.)
Consent Decree Section 12 (Absenteeism)
The requirements of Section 12 have been met by the district. The district assigns non-instruc-
tional certificated staff to substitute when regular substitutes are not available for teacher absenc-
es. The district requires each site to address ways to reduce employee absenteeism in their school
site plans. Staff absentee reports are provided to the sites for administrators to review. The super-
Executive Summary
intendent has set an annual goal of increasing teacher attendance to 97%. (See related Personnel
Management Standard 8.2 – Current Rating: 10. Standard 8.2 was not required to reach an 8.)
Consent Decree Section 13 (Homework)
The requirements of Section 13 have been met by the district. The district developed and imple-
mented a district wide homework policy in 2000. A monthly certification by the site principals
that a homework policy is being implemented is submitted to the district office. Parent notifica-
tions regarding the homework policy are sent home at the beginning of each semester. The Stu-
dent and Parent/Guardian Handbook contains the district’s homework policy. The handbook is
updated annually and distributed to parents. Schools keep the signed acknowledgement of receipt
forms from parents. (See related Pupil Achievement Standards 1.2 – Current Rating: 10, and 1.11
– Current Rating: 10. Standards 1.2 and 1.11 were required to reach an 8.)
Consent Decree Section 19 (Student Promotion)
The requirements of Section 19 have been met by the district. A promotion/acceleration/retention
policy, Policy No. 5123, was adopted by the board on April 11, 2000. Information on the policy
is distributed to parents through the Student and Parent/Guardian Handbook. Plaintiffs’ counsel
was invited to provide written comments on the draft policy as it was developed. A copy of the
policy was sent to Plaintiffs’ counsel as required by the Consent Decree for written comment. No
comments were submitted. (See related Pupil Achievement Standards 1.5 – Current Rating: 10,
and 1.16 – Current Rating: 10. Standards 1.5 and 1.16 were required to reach an 8.)
Consent Decree Section 20 (CBEST)
The requirements of Section 20 have been met by the district. The district identifies teachers
without clear credentials and their length of employment. The district accepts CBEST waivers
only when credentialed teachers are not available for the hard-to-fill special education positions.
An annual report of the number of teachers who do not have a clear credential and the length of
their employment is provided to the board. The percent of teaching staff with clear credentials
continues to increase. 86% of regular education teachers and 50.5% of special education teach-
ers are currently credentialed. The salary schedule is differentiated (less compensation for teach-
ers without full credentials) to motivate teachers to speedily obtain a clear teaching credential.
(See related Personnel Management Standard 3.10 – Current Rating: 10. Standard 3.10 was not
required to reach an 8.)
Consent Decree Section 24 (Race Relations)
The requirements of Section 24 have been met by the district. The district parent advisory coun-
cil works to promote positive race relations among the various ethnic groups in the community.
Most schools have Peer Mediation and/or Conflict Resolution student groups to work with other
students on resolving student concerns. Secondary school sites have established student-directed
Human Relations clubs to assist in planning and implementing the activities in observation of
various cultural events. The district has purchased instructional materials on the Hispanic, Asian,
Pacific Islander and the African-American cultural experiences. Curriculum staff has worked to
incorporate these materials into the Social Science curriculum. Activities recognizing Black His-
tory month, Spanish Heritage month, and the birthdays of Cesar Chavez and Dr. Martin Luther
Executive Summary
King, Jr. take place annually. An annual districtwide Cultural Diversity Celebration was held in
April 2005 and one is scheduled for April 2006. The district has received a Teaching American
History grant to teach inclusion of the contributions of various racial and ethnic groups. (See re-
lated Pupil Achievement Standard 1.10 – Current Rating: 9. Standard 1.10 was required to reach
an 8.)
Consent Decree Stipulations Related to Facilities Management
There are several stipulations within the Consent Decree that relate to and affect school facili-
ties. These stipulations include: Condition of Bathrooms, Broken Windows, Electrical, Security
Plan, Emergency Drills, Litter, Drinking Water, Site Committees, Food Service, Parent Volunteer
Strategies, and Central Telephone Number for Facilities Complaints. Several FCMAT standards
in the Facilities Management operational area are also affected by an additional compliance
requirement of needing to reach a rating of 8 (on a scale of 1-10) to be deemed compliant. These
specific standards are listed in the chart of Facilities Management standards in the Facilities
Management section of this report.
Consent Decree Section 7 (Bathrooms)
The requirements of Section 7 have been met by the district. Generally, bathrooms are safe,
supplied and operable. All site bathrooms continue to be inspected a minimum of three times
daily by the principal and/or other staff. Records of this monitoring process are maintained at the
site for inspection. The bathrooms are also monitored during periodic, unannounced site visits
to school campuses. A FCMAT checklist is used to monitor compliance with Consent Decree
stipulations. All written documents and logs are reviewed and any needed follow-up discussed
with the site administrator. The passage of a local general obligation bond in 2002 has enabled
the modernization of many restrooms in the district’s schools. Four bathroom monitors have been
hired at each high school. (See related Facilities Management Standard 9.4 – Current Rating:
10. Standard 9.4 was required to reach an 8.)
Consent Decree Section 9 (Broken Windows)
The requirements of Section 9 have been met by the district. Identified boarded windows are
replaced with clear glass, Plexiglass or other clear permanent material. Certain windows are
allowed to be boarded for safety and property protection. Broken windows are replaced as soon
as possible. Materials used to temporarily secure broken windows require that a date and time
be affixed on the temporary material that is placed on the window. Sites are monitored regularly
to ensure compliance. (See related Facilities Management Standard 1.12 – Current Rating: 10.
Standard 1.12 was required to reach an 8.)
Consent Decree Section 10 (Electrical)
The requirements of Section 10 have been met by the district. Plant managers have been directed
to daily inspect for electrical problems, report emergency conditions for immediate repair, and to
submit a monthly report to the Facilities Division. These monthly reports have been documented.
A Facilities Compliance Coordinator visits all school sites on a regular basis to check for any
hazardous conditions, including broken or loose wiring. Reports of conditions needing attention
Executive Summary
are reported to the Facilities Division. The district has established an emergency hot line for use,
and has designated any electrical hazard as an emergency condition. The district and plaintiffs’
counsel selected a licensed electrician to conduct site inspections of specific identified sites in the
2000-2001 school year. (See related Facilities Management Standard 9.8 – Current Rating: 10.
Standard 9.8 was required to reach an 8.)
Consent Decree Section 14 (Security Plan)
The requirements of Section 14 have been met by the district. There is a districtwide security
plan. School sites have established school site safety committees to continually determine site
safety concerns and recommend remedial action to the district office. The district security com-
mittee referenced in the Consent Decree has been established. The committee has input into
updates of the district wide security plan. Parents have been encouraged to participate in school
security patrols. Monitored intrusion alarm systems have been installed in the district’s schools.
The district’s police force continues to work with the district and site safety committees. The
district, in collaboration with the city, has established an Emergency Operations Center in the
district police services department to respond to more widespread community disasters. (See
related Facilities Management Standard 1.3 – Current Rating: 10. Standard 1.3 was required to
reach an 8.)
Consent Decree Section 15 (Emergency Drills)
The requirements of Section 15 have been met by the district. Written emergency plans are avail-
able at the school sites. Every school site has a fire warning system required by Education Code
Section 32001. Several schools have strobe fire alarm systems besides the bell alarms. The re-
quired fire and earthquake drills are practiced according to the pertinent Education Code sections
and recorded. These records are monitored by the district Facilities Compliance Coordinator.
The district also implemented Code Yellow procedures and drills to respond to school emergen-
cies. (See related Facilities Management Standard 1.9 – Current Rating: 10. Standard 1.9 was
required to reach an 8.)
Consent Decree Section 16 (Litter)
The requirements of Section 16 have been met by the district. The district has a graffiti abate-
ment program in place, which is one of immediate removal. School campuses are inspected
regularly and graffiti is removed immediately. Litter is picked up daily. Unusable playground
equipment has been repaired or removed. The community service program in which all children
are encouraged to perform five hours of community service per semester for litter removal is im-
plemented at a few schools. A recycling program is in place at several schools. The high school
graduation requirements have been modified to require 2.5 credits in community service. The
course requirement is the equivalent of 45 hours, or one quarter of a year’s credits. All students,
beginning with the graduating class of 2006, are required to meet this requirement for gradua-
tion. (See related Facilities Management Standard 1.8 – Current Rating: 10, and 1.14 – Current
Rating: 10. Standards 1.8 and 1.14 were required to reach an 8.)
Consent Decree Section 17 (Drinking Water)
The requirement of Section 17 has been met by the district. Drinking water is readily available to
all children at all school sites. School sites are inspected regularly and water fountains checked
for operability. (See related Facilities Management Standard 8.10 – Current Rating: 10. Stan-
dard 8.10 was required to reach an 8.)
0 Executive Summary
Consent Decree Section 18 (Site Committees)
The requirements of Section 18 have been met by the district. The district established a represen-
tative community committee to assist in the development of the district’s Facilities Master Plan.
An assessment of the facilities needs at all district sites was conducted and a facilities inventory
and priority criteria developed. School site safety committees and/or site advisory councils con-
tinue to conduct site inspections and monitor site safety needs. A Williams complaint procedure
for parents to report concerns with facilities or sufficiency of instructional materials has been
implemented. The district monitors the sites to ensure that site committees are operational. (See
related Facilities Management Standards 1.12 – Current Rating: 10, 1.14 – Current Rating: 10,
and 9.11 – Current Rating: 10. Standards 1.12, 1.14 and 9.11 were required to reach an 8.)
Consent Decree Section 21 (Food Service)
The requirement of Section 21 has been met by the district. The Los Angeles County Health
Department indicates that inspections of school cafeterias are usually conducted only in response
to a complaint. The inspections conducted by the County Health Department of the site cafete-
rias during the 2000-2001 school year were shared with the school site committees. There were
no inspections conducted during the 2001-2002 school year. In 2002-03 the Health Department
visited a site cafeteria in response to a parent complaint and found that the complaint was un-
substantiated. A visit occurred at a school in summer 2003, and a report of that complaint was
shared with the site administration and site council. One inspection was conducted during the
second semester of the 2003-2004 school year in response to a complaint that was determined to
be unfounded. An inspection was conducted in January 2005 concerning the lack of hot water at
an individual site. Hot water was immediately restored and food preparation was not affected.
No complaints or inspections occurred through January 2006. All district cafeteria managers
and cooks participate in the Serve-Safe national certification program. The district has three food
services employees who are trainers in this certification program. (See related Facilities Manage-
ment Standard 9.3 – Current Rating: 10. Standard 9.3 was required to reach an 8.)
Consent Decree Section 22 (Central Telephone Number for Facilities Complaints)
The requirements of Section 22 have been met by the district. Communication with the com-
munity about facilities issues is ongoing and continual. The district has established a facilities
emergency hot line for school sites to utilize. The types of emergencies reported are being tabu-
lated. The Facilities Division can be reached by the public through the district’s central voice
messaging system. The district is participating in the WE-TIP program, which provides a phone
number for community members to make anonymous tips to the district concerning facilities and
safety issues. Posters on the WE-TIP program have been disseminated to all school sites. Tabula-
tion of the number and nature of the calls received and the disposition of the complaints need to
be provided in a quarterly report that is available to counsel for the plaintiffs and the public. The
district has implemented a Williams complaint procedure for parents to report concerns about fa-
cilities or the sufficiency of instructional materials. (See related Facilities Management Standard
11.2 – Current Rating: 10. Standard 11.2 was not required to reach an 8.)
Consent Decree Section 23 (Volunteerism)
The requirements of Section 23 have been met by the district. The district continues to work to
ensure parents and community members feel welcome in the schools. The Volunteers in Public
Schools (VIPS) handbook was developed and approved by the board in the 1999-2000 school
year and was updated in June 2005. This document provides direction to volunteers about be-
Executive Summary
coming involved in their schools. Parents are actively recruited to volunteer, and the district does
an excellent job providing recognition programs. Year-end recognition dinners have been held
annually since spring 2001 to recognize outstanding volunteers from each school in the district.
The number of volunteer hours at each school site is recorded and tabulated. Parents and commu-
nity members are more involved in educational decision-making. Four parent forums were held
in 2002-2003, five in 2003-2004, four in 2004-05, and one during fall of the 2005-06 school year
with three more scheduled for spring 2006. In the 2001-2002 school year, parents and communi-
ty members were involved in the superintendent search process, and in the decision to implement
a full-day kindergarten program in the district. Parent volunteers were involved in helping to pass
the district’s general obligation bond in November 2002. (See related Facilities Management
Standard 10.1 – Current Rating: 10. Standard 10.1 was not required to reach an 8.)
Consent Decree Section 25 (Additional Compliance Requirements)
The requirements of Section 25 have largely been met by the district. A comprehensive Facili-
ties Master Plan was developed by the district and was approved by the Advisory Board in July
1999. A Facilities Implementation Plan, providing priorities and a time line for implementing
the recommendations within the Facilities Master Plan, and identifying possible sources of state
and district funds to support the implementation was approved by FCMAT on August 10, 2001,
and adopted by the Advisory Board in August 2001. Several Pupil Achievement and Facilities
standards were identified in the Consent Decree as needing to reach a rating of 8 to be deemed
implemented. All identified standards in the Facilities Management and Pupil Achievement op-
erational areas have reached a rating of 8 or better. (See related Facilities Management Standards
2.1 – Current Rating: 10, and 3.10 – Current Rating: 10. Standards 2.1 and 3.10 were required
to reach an 8.)
The district has met the consent decree stipulations of Sections 1 through 24. The only remaining
Consent Decree stipulation to be completed in Section 25 is implementing the district’s Facilities
Master Plan.
Executive Summary
Status of Facilities Master Plan Implementation
Consent Decree Section 25(a)
As the implementation of the district’s Facilities Master Plan remains the only Consent Decree
stipulation not yet completed, this section summarizes the district’s efforts to implement its Fa-
cilities Master Plan and fully comply with all stipulations of the Consent Decree.
Background
The Compton Unified School District developed a long-range Comprehensive Facilities Master
Plan in July 1999. The Facilities Master Plan was developed by Fields and Devereaux, Architects
and Engineers, with input provided by a district facilities master plan committee that included
parents and community representatives. A facilities assessment was made of every school site
and district property and all facilities deficiencies were noted. Facilities needs at each site were
identified as either a life/safety concern, a facilities need that could be addressed as a deferred
maintenance project, a facilities need that should be addressed through modernization of the
facilities, or as a capital improvement project. The Facilities Master Plan was approved by the
Compton USD Advisory Board on July 13, 1999.
A Facilities Implementation Plan was developed by the district in June 2001 and submitted to
FCMAT for approval. FCMAT solicited comments from the plaintiffs’ counsel prior to approval
as required in the Serna v Eastin Consent Decree, and approved the Implementation Plan effec-
tive August 10, 2001. The Advisory Board adopted the Implementation Plan in August 2001. The
plan provided a time line to address the district’s most pressing facilities needs and provided a
priority for the modernization and new construction projects to be completed by the district as
state funds became available. Project priorities were made based on the following: Priorities 1)
and 2) Life/Safety and Deferred Maintenance Projects, Priority 3) Modernization Projects, and
Priority 4) Capital Improvement Projects.
The Comprehensive Facilities Master Plan and the priorities established in the Facilities Imple-
mentation Plan have provided the basis for addressing the district’s facilities needs since 1999.
The district planned to commit $2 million to $2.6 million in general funds annually for capital
improvement projects and $835,000 as the district’s annual match for deferred maintenance proj-
ects. The district actually expended approximately $5 million in 1999-2000 and $10 million in
2000-2001 on facilities projects and continued to allocate healthy subsequent annual budgets to
the facilities division. General funds allocated to the facilities budget and deferred maintenance
funds were used to address the district’s facilities priorities, as state and local general obligation
bond funds were not then available.
The district received approval from the Office of Public School Construction and the Division of
the State Architect for 28 modernization projects and several new school construction projects
and submitted the projects for state funding. As state funds were not available, the district’s proj-
ects remained on the list of approved projects awaiting state funding.
The district made three unsuccessful attempts prior to 2001 to pass a local bond measure to sup-
port facilities repairs. These unsuccessful bond measure attempts made the district eligible for fi-
nancial hardship status, eligible to receive 100% of state funding when state funds became avail-
able, without the requirement that the district provide its share of matching funds. The district
Executive Summary
received $17 million in planning funds in 1999-2000 and became eligible to receive $135 million
for its modernization and new construction projects. However, the state had no funds available to
provide to the district to implement its modernization and construction projects.
California voters passed Proposition 39 in November 2000, which allows local educational agen-
cies to incur bonded indebtedness based on a 55% vote rather than the two-thirds vote previously
required. Prop 39 contained specific provisions that require that specific projects to be funded
with the bond funds be identified, and requires an annual audit to ensure that funds are expended
only for the identified projects and that there is a proper accounting for the funds.
In fall 2001, the district began plans to make another attempt at passing a general obligation bond
(GOB) in the November 2002 election. The district determined the size of the bond that the com-
munity might reasonably support at $80 million, and identified several of the most pressing projects
from the Facilities Master Plan to address with these bond funds, as the $80 million, even with
matching state funds, could not address all of the needs identified in the Facilities Master Plan. The
list of projects included construction of two of the three new schools (Clinton and the Tamarind
Avenue School) in the district’s Facilities Master Plan and renovations of existing facilities at 28
elementary, middle and high school sites. Because of the three previous unsuccessful attempts
to pass a GOB, the district also decided that the bond measure would be placed on the ballot as a
Proposition 39 bond measure, requiring only 55% of voter approval for passage. The bond cam-
paign literature publicized the identified list of projects to be addressed.
The District’s Building Program Begins
Anticipating the success of its latest bond effort at the lower voter approval requirement, the dis-
trict arranged financing to begin construction of one of the two new schools identified in the list
of projects to be addressed with the bond funds. In spring 2002 the district Governing Board ap-
proved a $16 million Certificate of Participation (COP) to begin construction of the new Clinton
Elementary School to alleviate overcrowding in several district elementary schools, with the ex-
pectation that the successful passage of the bond would retire the COP. Construction on the new
school project began in summer 2002 and the William Jefferson Clinton Elementary School was
opened to students in January 2003. This was the first school built in the district in thirty years.
The district successfully passed Measure I, an $80 million local general obligation bond (GOB),
in November 2002. The projects identified to be addressed with Measure I funds came from the
Comprehensive Facilities Master Plan approved by the Advisory Board in July 1999 and the Fa-
cilities Implementation Plan priorities approved in August 2001. $12 million for construction of
Clinton Elementary School was included in the list of planned GOB expenditures. With the suc-
cessful passage of the district’s local GOB, the district lost its hardship eligibility, thus requiring
the district to provide local matching funds for any state funds received. The district is required
to provide a 20% match for modernization projects and a 50% match for new construction proj-
ects. The district’s Measure I funds provide the resource for the district’s matching funds.
The state passed a General Obligation Bond, Proposition 47, in November 2002, making state
funds available for the district’s approved modernization and new construction projects wait-
ing in the “pipeline” of approved projects from districts across the state. With the passage of the
district’s Measure I General Obligation Bond and the availability of state funds from Proposition
47, the Compton Unified School District initiated an aggressive construction program to meet the
last remaining Consent Decree stipulation.
Executive Summary
The district established a Bond Oversight Committee in spring 2003 consisting of twelve com-
munity members and a representative of FCMAT to monitor the expenditure of Measure I bond
funds for the district’s construction projects. Individual board members submitted the name of
an appointee for board approval. As board members elected in November 2003 had not partici-
pated in appointing members to the Oversight Committee, the board acted to increase the mem-
bership on the committee, allowing the new members to submit the name of an appointee. On
January 25, 2005, the board appointed two additional members to the committee for a total of
15 members. On February 8, 2005, the board appointed another member for a total of 16 mem-
bers. In March 2005, however, two committee members resigned and one member passed away,
returning the committee membership to 13 members. The board agreed to leave the committee
membership at 13 members.
Following the November 2005 election, the new board in January 2006 decided to reorganize the
Oversight Committee membership, and cancelled the scheduled February 2006 meeting of the
committee until new members have been appointed by the newly seated board.
The Bond Oversight Committee met monthly since April 2003, receiving status reports on the
district’s various projects and making periodic visits to the sites under construction. The commit-
tee completed its first annual report in summer 2004, summarizing its activities for the Compton
USD governing board. The committee’s work to complete and issue its second annual report
was interrupted by the board’s actions to reorganize the committee.
The district hired a construction management firm, GKK Corp., and implemented a construction
program utilizing $80 million in Measure I funds and more than $80 million in Proposition 47
state funds. The district had sixteen modernization projects under construction in fall 2003. Dis-
trict projects have generally been on schedule and within budget, with only 2% in construction
overruns. All of the district’s projects are scheduled to be completed by summer 2006.
Modernization projects were initiated at the following schools in fall 2003:
1. Centennial High School
2. Roosevelt Middle School
3. Whaley Middle School
4. Willowbrook Middle School
5. Bunche Middle School
6. Anderson Elementary School
7. Mayo Elementary School
8. Emerson Elementary School
9. McNair Elementary School
10. Roosevelt Elementary School
11. Kelly Elementary School
12. Dominguez High School
13. Cesar Chavez Adult School
14. Washington Elementary School
15. Laurel Elementary School
16. Carver Elementary School
Executive Summary
Modernization projects were initiated at five schools in spring 2004 at:
17. Lincoln Elementary School
18. Bunche Elementary School
19. Vanguard Middle School
20. Dickison Elementary School
21. Kennedy Elementary School
Modernization projects were initiated at seven schools in June 2004 at:
22. Bursch Elementary School
23. Caldwell Elementary School
24. McKinley Elementary School
25. Tibby Elementary School
26. Davis Middle School
27. Walton Middle School
28. Compton High School
New classroom buildings were added at the following schools in 2003-2004:
1. Foster Elementary School
2. Kelly Elementary School
3. Roosevelt Elementary School
4. Willard Elementary School
5. Roosevelt Middle School
6. Whaley Middle School
The completion of the 28 approved modernization projects with the use of state and local bond
funds is anticipated by summer 2006. Clinton Elementary School is the first of the district’s three
approved new school construction projects from the Facilities Master Plan to be completed.
The district office administrative operations were moved to a temporary site at 500 South Santa
Fe Avenue in late fall 2004 and the previous district office site at South Tamarind Avenue is to
be demolished to construct the second new elementary school identified in the list of Measure I
projects. Construction of the second elementary school at Tamarind Avenue, Liberty Elementary
School, will be supported by funds from Measure I and Proposition 47. The district governing
board approved a Certificate of Participation (COP) to construct a new district office administra-
tive complex on Santa Fe Avenue. The new district administrative offices are currently under
construction with completion anticipated in fall 2006.
Facilities Summary
The district continues to make significant progress implementing its Facilities Master Plan and
meeting the stipulations of the Consent Decree.
On June 6, 2005, the Oversight Committee received the Financial and Performance Audits
performed by the audit firm Vicenti, Lloyd and Stutzman for the GOB Measure I funds for the
period March 25, 2003 through June 30, 2003 and for the Fiscal Year ending June 30, 2004. The
auditors reported that the district’s financial statements fairly presented the Measure I funds in all
material respects and conformed with generally accepted accounting principles. There were no
audit findings.
Executive Summary
The funds available from the state and local bonds have allowed the district to implement the
facilities projects identified in its Comprehensive Facilities Master Plan. However, several mem-
bers of the board elected in November 2003 did not demonstrate the same level of commitment
to fully implement the Facilities Master Plan as previous boards. Some board members were
highly critical of the district’s facilities activities and staff, not understanding the commitment
made by previous boards to meet the terms of the Serna v Eastin Consent Decree.
The district administration was challenged to implement the district’s planned building program
in 2004 and 2005 when several members of the previous board were unsupportive of the dis-
trict’s efforts.
• Board action on facilities agenda items was often delayed, causing staff and vendor
frustration and jeopardizing timely receipt of state funding.
• A board member criticized the district administration for not providing preferential
consideration in the bid selection process to local, minority businesses from select zip
codes in the community. This is contrary, however, to appropriate bidding practices.
• The board delayed adoption of the 2004-05 budget as they did not agree with the district’s
budget priorities for facilities. The district administration explained that failure to meet
budget adoption guidelines could have serious consequences for the district, as the county
office could develop the budget for the district. The budget was ultimately adopted and
submitted to the county office on time.
• On January 25, 2005, the board approved a Project Labor Agreement (PLA), without
conducting a community forum as requested by three board members to consider
the impact of the agreement on the community and the district’s future construction
projects. The district recommended against the action as construction costs under the
PLA agreement would increase, curtailing the scope of the district’s planned construction
projects or the number of planned projects that might be completed with available funds;
and reducing the number of construction firms willing to bid on the district’s projects.
The board agreed to a five-year PLA contract by a vote of 4 to 3. This decision will have
a long-term impact on the district’s future facilities activities.
The November 2005 election provided two new board members and returned two incumbent
board members to the seven-member board. The district facilities staff will need to continually
update the newly seated board on the Facilities Master Plan, the Implementation Plan, and the
status of the district’s construction projects. It is hoped that all members of the current board will
embrace the commitment to fully comply with the stipulations of the Consent Decree and imple-
ment the Facilities Master Plan as approved by the previous board in 1999.
Executive Summary
Executive Summary
Parent Survey
FCMAT meets with the counsel for the plaintiffs and defendants every 60 days as required by the
Consent Decree. District administrators participate in these 60-day meetings, providing FCMAT
and the ACLU with regular status reports on the district’s compliance with the stipulations of
the Consent Decree. Consent Decree issues are discussed in this committee and regular visits to
campus sites are conducted by committee members.
Section 31. (d) of the Consent Decree required FCMAT to conduct semi-annual community
meetings in which parents and students were invited to comment on the status of compliance
with the Consent Decree. FCMAT scheduled, advertised and conducted community forums
every six months beginning in September 2000 through May 2003, following the August and
February distribution of each of the six-month progress reports. Over time, however, parent/
community participation significantly decreased.
In July 2003 the committee discussed the necessity of continuing the semi-annual meetings as
participation had steadily declined, and the district itself was conducting several parent forums
each year, providing a regular venue for parent/community input on various issues. These dis-
trict forums were well-attended.
Plaintiff’s counsel indicated that the purpose of the FCMAT forums was to provide parents
an avenue to voice their concerns without fear of retaliation, but was amenable to the use of a
questionnaire in lieu of the semi-annual meetings to solicit comments. A parent survey, printed
in English and Spanish, was first conducted by FCMAT in fall 2003. 1,020 parents responded to
the following questions. A summary of the responses is provided in parenthesis.
Fall 2003 Parent Survey
1. Has the school provided you with sufficient opportunities to give input or hear concerns
about your child’s education? (792 parents responded yes, 204 no)
2. Did your child receive textbooks and necessary instructional materials in all core subjects
such as English, math, history and science this school year? (827 yes, 176 no)
3. Does your child receive sufficient homework on a regular basis? (948 yes, 63 no)
4. Please grade the school facilities at your child’s school (i.e., bathrooms, classrooms,
cafeteria, library, gym). (198-A, 253-B, 306-C, 132-D, 104-F)
5. Please grade your overall satisfaction with your child’s educational experience. (377-A,
358-B, 185-C, 43-D, 34-F)
6. What repairs, if any, are needed at your child’s school? (Responses varied by sites.
Restrooms were the most frequently listed item.)
Survey data was disaggregated by individual school sites and shared with the site administrators
and staffs.
In spring 2004, after reviewing the survey data, the committee agreed that the survey informa-
tion was valuable and that the parent survey should be continued. Over the next several months
the survey was revised by the committee members and produced by the ACLU in an attractively
formatted colored brochure. 36,000 surveys were printed and distributed to every student house-
hold in the district in late January 2005.
Executive Summary
The spring 2005 Parent Survey results were tabulated by FCMAT and the information presented
to the committee members in April 2005. Although 1198 surveys were returned, the commit-
tee was disappointed that there was little or no survey response from some of the schools: no
responses from King Elementary, Thurgood Marshall Independent Study Program and Walton
Middle School, and minimal responses from Centennial and Compton High, Willowbrook and
Vanguard Middle, and Carver Elementary schools.
Spring 2005 Parent Survey
1. Has the school district provided you with sufficient opportunities to give input or hear
concerns about your child’s education? (900 parents responded yes, 290 no)
2. Did your child receive textbooks and necessary instructional materials in all core subjects
such as English, math, history and science this school year? (981 yes, 201 no)
3. Does your child receive sufficient homework on a regular basis? (947 yes, 122 no)
4. Do you know how to contact the district to report a facilities problem or emergency?
(714 yes, 407 no)
5. Are you aware that the WE-TIP hotline to report vandalism or crimes on school property
can also be used to report concerns about school facilities such as broken windows,
bathroom problems, and excess litter? (512 yes, 555 no)
6. Please grade the school facilities at your child’s school (i.e., bathrooms, classrooms,
cafeteria, library, gym). (200-A, 335-B, 282-C, 124-D, 71-F)
7. Please grade your overall satisfaction with your child’s educational experience. (373-A,
365-B, 192-C, 59-D, 28-F)
8. What repairs, if any, are needed at your child’s school? (Responses were varied
depending on the site. 273 parents listed restrooms, 104 listed classrooms, and 103
listed completing the repairs in progress.)
The survey results of these parent concerns were disaggregated by individual sites to share with
the individual school site administrators and staffs, to allow them to respond to the concerns
communicated to them through this survey.
At the 60-day meeting held in early February 2006, the committee discussed whether there was a
need to continue conducting the parent survey to solicit parent/community input. The committee
agreed that in lieu of the parent survey, FCMAT might consider other avenues to solicit parent
input, such as utilizing the district’s web site to advertise a contact web address and telephone
number, or holding office hours for face-to-face meetings with interested parents or community
members. FCMAT will solicit parent/community input utilizing these avenues prior to the next
August 2006 progress report.
0 Executive Summary
HISTORICAl BACkgROuND: lEgISlATION AND STATE RECEIvERSHIp OF THE
COMpTON uNIFIED SCHOOl DISTRICT
In July 1993, Assembly Bill 657/Murray (Statutes of 1993, Chapter 78) appropriated $10.5
million in the form of an emergency loan for the Compton Unified School District. This loan
required the appointment of a state administrator who would exercise the powers and respon-
sibilities of the Governing Board. In October 1993, Assembly Bill 1708/Murray (Statutes of
1993, Chapter 924) provided a second emergency loan of $9.45 million. This loan required the
district to comply with Education Code Section 41325, which continued the assignment of the
state administrator. In September 1993, Assembly Bill 33/Murray (Statutes of 1993, Chapter
455) provided further clarification and conditions regarding the emergency apportionment. This
bill stipulated that the state administrator retain authority for the operation of the district until
such time as the Superintendent of Public Instruction determined the district had met the fiscal
requirements and had made demonstrated academic progress.
The above mentioned legislation required the state emergency loans to be repaid and the academ-
ic performance of the district to improve prior to the board being restored its legal rights, duties,
and powers. The district made the 6th and final loan payment in June 2001. In the six years fol-
lowing 1996, the district repaid a total of $24,358,061 in loans and interest.
Through Assembly Bill 52/Washington (Statutes of 1997, Chapter 767), the legislature stated
its intent to return the designated legal rights, duties, and powers of governance to the Compton
Unified School District Board of Trustees. In addition to the above bills, AB 52 required the
assessment of five major operational areas of school district operation: Community Relations,
Personnel Management, Pupil Achievement, Financial Management, and Facilities Management.
AB 52 required FCMAT and the state administrator, in consultation with other specified entities,
to conduct comprehensive assessments and to develop specified recovery plans in the five desig-
nated areas.
In addition to a systemic, district-wide assessment and the development of a recovery plan,
FCMAT was required to determine whether the school district made substantial and sustained
progress in the five designated areas. Where there was substantial and sustained progress, FC-
MAT recommended to the Superintendent of Public Instruction the operational areas of school
operation that should be returned to the Governing Board of the CUSD. As a result of this re-
quirement, an incremental return of the legal rights, duties, and powers to the Governing Board
occurred over time. The State Superintendent of Public Instruction formally returned full govern-
ing authority of all operational areas to the CUSD Governing Board in an executive order dated
September 11, 2001, and effective December 11, 2001. The State Administrator was, at that time,
named as State Trustee to continue to provide oversight of fiscal matters.
In a letter dated June 2, 2003, the State Superintendent of Public Instruction terminated oversight
of the Compton USD by the State Trustee, who served through June 13, 2003. The Compton
Unified School District and its Governing Board became free of state oversight for the first time
in more than ten years.
Executive Summary
Incremental Return of legal Rights, Duties and powers in
Designated Operational Areas to CuSD
The return of authority over specific district operational areas occurred over time. FCMAT’s
third six-month progress report, in August 2000, recommended to the Superintendent of Public
Instruction that the designated operational areas of Community Relations and Facilities Manage-
ment be returned to the Governing Board of the Compton Unified School District. The Superin-
tendent acted to return the two operational areas to the Governing Board in January 2001. The
SPI also authorized the Governing Board to select and hire a district superintendent.
FCMAT’s fourth six-month report in February 2001, recommended that the operational area of
Pupil Achievement be returned to the Governing Board of the Compton Unified School District.
Although academic performance remained below average, academic performance scores con-
tinued to increase. The district had focused efforts on improving student performance and had
procedures in place to identify and address student deficiencies. However, the Superintendent of
Public Instruction did not return governance of Pupil Achievement to the Governing Board as
recommended by FCMAT in its fourth six-month progress report. The SPI indicated, in a letter to
the district dated March 26, 2001, that the district would benefit from additional time to deter-
mine how well the academic processes were being implemented. The SPI also indicated that it
would be prudent to evaluate the district’s spring testing results to determine the effectiveness of
the steps taken by the district in the previous year.
In the fifth six-month progress report in August 2001, FCMAT recommended that the operational
areas of Personnel Management and Financial Management be returned to the Governing Board
of the Compton Unified School District. Additionally, it was recommended that the operational
area of Pupil Achievement be returned to the Governing Board as recommended in the fourth
six-month progress report. The district had also selected and hired a district superintendent who
assumed the position in August 2001. The State Superintendent of Public Instruction formally
returned governing authority for all operational areas to the CUSD board in an executive order
dated September 11, 2001, and effective December 11, 2001. The SPI further assigned the State
Administrator to serve as the State Trustee in an oversight capacity for two years.
The State Superintendent of Public Instruction on June 2, 2003, formally terminated state over-
sight of the district by the State Trustee, effective June 13, 2003.
Executive Summary
Executive Action on Return of legal Rights, Duties and
powers in Designated Operational Areas to CuSD
Executive Order, January 2001, Response to Third Six-Month Progress Report:
The Superintendent of Public Instruction, on January 30, 2001, formally notified the Compton
USD Governing Board of executive action taken to restore the Board’s rights, duties, and obliga-
tions in the operational areas of Community Relations and Facilities Management.
The Superintendent of Public Instruction, in negotiations with the Compton Governing Board
over the process of incremental return of powers, agreed to remove the term ‘advisory’ from
the Compton Governing Board’s title, provided the reinstatement of stipends and benefits upon
the recommended return of another operational area of governance, and authorized the Board to
begin the search process for a permanent superintendent. Upon completion of the search pro-
cess, the Governing Board would have final authority to select a permanent superintendent from
amongst the candidates.
The Superintendent of Public Instruction indicated that the State Administrator would serve as
the district’s interim superintendent for the areas over which the Compton Board has authority,
and would serve as the State Administrator for the areas over which the Compton Board does not
have authority. The SPI recognized the Board’s desire to hire an interim superintendent for the
two areas returned, Community Relations and Facilities Management. However, the Superinten-
dent of Public Instruction determined that “waiting a few months until the permanent superinten-
dent is in place will provide for a smoother transition.”
The district, with the assistance of CSBA, completed a superintendent search process and unani-
mously selected and appointed a superintendent to begin work in the district August 20, 2001.
Executive Order No. 2, March 2001, Response to Fourth Six-Month Progress Report:
The Superintendent of Public Instruction, on March 26, 2001, formally notified the Compton
USD Governing Board of executive action to establish the board “stipend authorized under
Education Code section 35120, and such health benefits as are authorized under District policy
and law. In all other respects, the Superintendent’s January 30, 2001, Executive Order remains in
effect.”
The Superintendent of Public Instruction indicated that the District would benefit by having the
management of the operational area of Pupil Achievement remain for additional time under the
direct administration of the State Administrator. The SPI indicated that should appropriate prog-
ress be demonstrated in the area of Pupil Achievement, the return of local control in this opera-
tional area could be returned to the district in the fall.
The SPI also commented on the concerns raised by FCMAT as to whether the Board was em-
bracing the proper exercise of its governing authority. The SPI indicated concern as to the readi-
ness of the Board to effectively fulfill its policy-making role.
Executive Summary
Executive Order No. 3, September 2001, Response to Fifth Six-Month Progress Report:
The State Superintendent of Public Instruction issued Executive Order No. 3 which restored full
control to the Governing Board effective December 11, 2001. The executive order recognized
that the Compton Unified School District showed “substantial and sustained improvement in all
remaining areas not presently under local control.” The order further indicated that “the state ad-
ministrator shall assume the powers of the State Trustee… governing the oversight of the Comp-
ton Unified School District.” “Effective September 11, 2001, personnel commission members
shall be entitled to the maximum stipend authorized under EC 45250.”
Superintendent of Public Instruction Action, June 2003:
A new Superintendent of Public Instruction (SPI) was elected in November 2002. The previous
Superintendent had completed the maximum two-term limit for the position. The new SPI on
June 2, 2003 terminated state oversight of the Compton USD by the State Trustee, effective June
13, 2003, citing the district’s progress in governing itself. The State Trustee was reassigned to
another California district effective June 16, 2003.
Executive Summary
Standards-Based Assessment process
For schools and school districts to be successful in program improvement, the evaluation, design
and implementation of the recovery plans must be standards-driven. When standards are clearly
defined, reachable, and communicated, there is a greater likelihood they will be measured and
met.
The Compton Unified School District was measured on a consistent rating format, and every
standard was given a scaled score from zero to 10 as to its relative status of completeness. The
following represents a definition of terms and scaled scores applied to this process. The single
purpose of the scaled score was to establish a baseline of information by which the district’s
gains and achievement in each of the standard areas could be measured.
• Not Implemented (Scaled Score of 0)
There is no significant evidence that the standard is implemented.
• Partially Implemented (Scaled Score of 1 through 7)
A partially implemented standard lacks completeness, and it is met in a limited degree.
The degree of completeness varies as defined:
1. Some design or research regarding the standard is in place that supports
preliminary development. (Scaled Score of 1)
2. Implementation of the standard is well into the development stage. Appropriate
staff is engaged and there is a plan for implementation. (Scaled Score of 2)
3. A plan to address the standard is fully developed, and the standard is in the
beginning phase of implementation. (Scaled Score of 3)
4. Staff is engaged in the implementation of most elements of the standard. (Scaled
Score of 4)
5. Staff is engaged in the implementation of the standard. All standard elements are
developed and are in the implementation phase. (Scaled Score of 5)
6. Elements of the standard are implemented, monitored and becoming systematic.
(Scaled Score of 6)
7. All elements of the standard are fully implemented, are being monitored, and
appropriate adjustments are taking place. (Scaled Score of 7)
• Fully Implemented (Scaled Score of 8 through 10)
A fully implemented standard is complete relative to the following criteria:
8. All elements of the standard are fully and substantially implemented and are
sustainable. (Scaled Score of 8)
9. All elements of the standard are fully and substantially implemented and have
been sustained for a full school year. (Scaled Score of 9)
10. All elements of the standard are fully implemented, are being sustained with high
quality, are being refined, and have a process for ongoing evaluation. (Scaled
Score of 10)
Executive Summary
By utilizing a standards-based approach, FCMAT was able to incorporate a scaled score to mea-
sure progress and to establish an acceptable level for the return of the Board’s legal rights, duties
and powers. AB 52 expressed the legislative intent that the Board be returned its designated legal
rights, duties and powers through an incremental process. To implement this intent, FCMAT es-
tablished a standard for the return of the legal rights, duties and powers. This standard was based
upon the scaled score system. When the average rating in an operational area reached a level of
6.00 and no individual standard was below 4.00, FCMAT recommended to the Superintendent of
Public Instruction the incremental return of that operational area to the school district.
Executive Summary
CONSENT DECREE
III. School Conditions and Instructional Materials
This section of the report provides a review of the progress made by the district toward imple-
menting the requirements of Consent Decree Sections 7-25. (Sections 1–6 refer to definitions and
general provisions.) The language of the Consent Decree is provided in italics.
Section 7. Bathrooms
a. All bathrooms used by children on all school sites in the CUSD will be in safe,
sanitary and operable condition, regularly cleaned with all lighting in working order
and stocked with standard toilet supplies, including toilet paper, soap and paper
towels. The bathrooms shall be accessible to children at all times school is in session;
however, at high schools, some restrooms may be locked at certain times of the day so
long as students have reasonable access to restrooms that are not locked.
b. The principal of each school shall be responsible for ensuring compliance with
the requirements of this Section. The principal shall ensure that each bathroom
is inspected prior to the start of school, prior to lunch period, and after the lunch
period. If the result of the inspection requires corrective action, the principal shall
be responsible for taking corrective action. Any condition that arises that renders
any portion of a bathroom unsafe, unsanitary, inoperable, unclean, or unlit shall be
remedied in accordance with the following time period:
(i) One hour after the inspection, if the condition can be remedied by janitorial
or custodial staff.
(ii) 24 hours (not counting weekends and holidays) after the inspection, if the
condition cannot be remedied by janitorial or custodial staff. The principal
shall notify the State Administrator’s office when conditions cannot be
remedied by janitorial or custodial staff.
c. The State Administrator shall require that each principal maintain a daily inspection
record of the bathrooms. The daily inspection record shall be kept on the form
developed by the State Administrator. The record shall include a description of the
bathroom’s condition and identify supplies that need to be provided. The inspection
record shall be available for inspection by the public. The State Administrator shall
periodically conduct reviews to ensure that the inspection record is being maintained.
FCMAT Facilities Management Standard 9.4 was the standard used to monitor the
district’s compliance with Section 7.
Consent Decree
Facilities Management Standard 9.4
Instructional Program Issues - Bathroom Facilities are Clean and Operable
Legal Standard
The governing board of every school district shall provide clean and operable flush toilets for the
use of pupils. [EC 17576; CCR Title 5 14030]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 7) include that all bathrooms used by children are safe,
sanitary and operable, regularly cleaned and stocked with supplies, and accessible when school
is in session; principals are to inspect bathrooms prior to the start of school, prior to and after the
lunch period, and are to take corrective action; principals will maintain daily inspection records
on a form developed by the State Administrator and make them available for public inspection.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. Restrooms continue to be inspected daily by the principal and/or staff. Records of moni-
toring are maintained at the site for review.
2. The maintenance department provides an emergency hot line for sites to call for emer-
gency services from the district.
3. Staff indicates that toilet facilities are operable.
4. The district has renovated restroom facilities at a number of schools through recent mod-
ernization projects. The district utilizes the path of student travel to identify the rest-
rooms to be first addressed.
5. Four restroom monitors are assigned to monitor the restrooms throughout the school day
at the three high schools.
6. A Facilities Compliance Coordinator, using a FCMAT inspection checklist, monitors
compliance with Consent Decree stipulations.
7. The district has fully implemented the Williams settlement protocols. Site inspections are
conducted by the Los Angeles County Office of Education. The district Facilities Com-
pliance Officer accompanies the Williams review teams on their site visits. Any deficien-
cies noted are promptly addressed by the district.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 4
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 8
August 2002 Rating: 8
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 8. Textbooks
a. Appropriate textbooks and instructional materials (hereinafter “instructional
materials”) in the core subject areas will be provided to all children in the CUSD. It
is understood by the parties that this requirement does not apply to courses of study,
such as performing or fine arts, that do not use textbooks.
b. Appropriate instructional materials are those textbooks and materials identified by the
teacher consistent with the adopted curriculum and approved by the principal and the
Deputy Superintendent of Education Support Services. Core subject areas are those
areas of study described for grades 1 through 6 in Education Code Section 51210 and
for grades 7 through 12 in Education Code Section 51220.
c. Children will be able to take home either a textbook used in each core subject class
or a reproduced portion of the textbook in order to prepare for class, study for
examinations, and complete homework. By February 1 of each year, defendants shall
prepare an inventory of all existing textbooks and identify the number and type of
textbooks that need to be acquired in order to implement this requirement during the
following school year.
d. Students will be assigned one textbook at the beginning of a course of study for the
entire duration of the course. If a student’s textbook is lost or destroyed for any reason
during the course, a replacement textbook need not be assigned unless the student
pays the cost of replacement.
FCMAT Pupil Achievement Standard 1.25 was the standard used to monitor the district’s
compliance with Section 8.
Consent Decree
Pupil Achievement Standard 1.25
Instructional Materials - Student Accessibility
Professional Standard
The district will ensure that all instructional materials are accessible to all students.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 8) include that each student will be assigned a textbook
in core subject areas at the beginning of a course of study, that children will be able to take home
textbooks or study materials, that a textbook inventory is developed by February 1st and that a
textbook replacement plan is developed.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. Each classroom has a complete set of textbooks. The district has implemented the Wil-
liams settlement protocols and has ordered sufficient numbers of textbooks to provide
each student with individual copies in the core academic courses for the 2005-06 year. A
Compliance Coordinator has been assigned by the district to monitor the district’s com-
pliance with implementing the Williams settlement protocols.
2. Teachers prepare textbook orders and inventory in the spring for the next school year. A
teacher follow-up survey to determine adequacy of textbooks is conducted in September/
October.
3. The district purchases new textbooks based on the state textbook adoption cycle. Teach-
ers participate in the selection of textbooks for adoption. Textbooks are recommended to
the board for approval. All textbooks selected are standards-based. Textbook adoption for
History/Social Science is scheduled for spring 2006.
4. Textbook adoption occurred in the following subject areas in spring 2005: Literature and
English/Language Arts (6-12), English Language Development, Highpoint (4-12), Math-
ematics (3-5), Health (9-12), and Foreign Language (6-8).
5. The district has a written textbook replacement plan in place. Textbook availability is
monitored by a review of the textbook assignment forms, lost textbook collection pro-
cess, and the purchase order requests made for replacement copies.
6. Parents sign off on textbook responsibility forms and the returned forms are filed in a
secure location at the school site. Students are required to maintain their textbooks in the
condition they were issued. Textbooks and library books are collected at the end of each
year to ensure accountability.
7. FCMAT conducted a survey of teachers from several district schools in June 2003 to
gauge teacher satisfaction with availability of appropriate instructional materials. The
vast majority of respondents indicated they had sufficient numbers of textbooks. A few
teachers responded in the negative. Follow up was provided by the district to those
schools that did not indicate 100% satisfaction.
Consent Decree
8. A textbook report dated November 10, 2003, provided detail on the district’s textbook
management plan, the district adopted textbooks, a textbook accountability summary and
a textbook order log. The textbook management plan is expected to be revised/updated in
2005-06.
9. The Board of Trustees approved a district Library Plan in January 2003. The district has
established a library book volume goal of a minimum of 13 books per student. The posi-
tion title for Library Aide has been changed to Textbook Clerk.
10. The district board approved Resolution # 05/06-15 on October 11, 2005 certifying the
provision of standards-aligned instructional materials.
11. Notices have been posted in the classrooms, alerting parents, guardians and the public
of their right to file a complaint under the Williams settlement concerning the following:
adequacy of textbooks, a certificated teacher vacancy, the misassignment of a teacher
who lacks credentials to teach English learners or who lacks subject matter competency,
or any condition of the facilities that poses an emergency or threat to the health and safety
of students or staff.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 4
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 5
August 2001 Rating: 5
February 2002 Rating: 6
August 2002 Rating: 7
February 2003 Rating: 8
August 2003 Rating: 8
February 2004 Rating: 8
August 2004 Rating: 9
February 2005 Rating: 9
August 2005 Rating: 9
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 9. Broken Windows
a. All boarded-up windows shall be replaced with clear glass, clear Plexiglass or other
clear permanent material so that there are no boarded-up windows in the CUSD.
In lieu of glass, Plexiglass, or other clear permanent material, the lowest row of
windows below eight feet in height may contain a permanent, painted material such
as wood or metal when deemed necessary by the State Administrator to prevent
individuals from breaking into or vandalizing school facilities.
b. Any window that is broken shall be replaced with clear glass, clear Plexiglass, or
other clear permanent material within 72 hours (not counting weekends or holidays).
c. Any material that is used to temporarily secure a broken window shall have affixed to
it the date and time the temporary material was placed on the window.
FCMAT Facilities Management Standard 1.12 was the standard used to monitor the
district’s compliance with Section 9.
Consent Decree
Facilities Management Standard 1.12
School Safety - Inspection and Correction of Unsafe Conditions
Legal Standard
Building examinations are performed, and required actions are taken by the governing board
upon report of unsafe conditions. [EC 173679(a)]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Sections 9 and 18) include replacing boarded-up windows, re-
placing broken windows within 72 hours, affixing a date and time to temporary material placed
on broken windows; establishing site committees to inventory and prioritize repair and mainte-
nance needs, and reporting to the State Administrator and board at least once a semester.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. Facilities inspections are regularly performed by site and district staff and required action
taken upon any report of unsafe conditions.
2. Plant managers are instructed to conduct daily inspections of the site and to immediately
report any unsafe condition.
3. District personnel conduct periodic, unannounced school site visitations on a monthly
basis to monitor conditions of school facilities. Schools receive a letter grade based on a
criteria checklist developed by FCMAT.
4. The district continues to comply with the speedy replacement of broken windows. The
General Obligation Bond for facilities improvements has allowed the district to replace
older windows and frames.
5. Schools have organized parent safety committees at each site. The committees periodical-
ly perform site inspections for unsafe or hazardous conditions and forward repair requests
to the maintenance department to address. The district has also implemented the Wil-
liams settlement protocols providing complaint forms for parents to report their concerns
about facilities conditions.
6. The district continues to utilize a maintenance request flow chart and forms to track all
maintenance requests from the sites. Logs of the maintenance requests are kept for each
school. Individual sites receive copies of all responses to the requests generated by the
site.
7. The maintenance department continues to immediately address emergency calls to the
maintenance hot line (310-639-4321, extension 55377).
8. Plant managers have been directed to conduct electrical inspections of their site on a daily
basis and to immediately report, in writing, any potentially hazardous electrical condition.
A monthly form for the documentation of these reviews was developed, and records of
the reports from the sites are being maintained.
0 Consent Decree
9. Monthly training meetings are held with the plant managers on district procedures and/or
on improving employee skills.
10. The district has hired ten temporary grounds workers to address the grounds of the mod-
ernized sites.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 6
August 1999 Rating: 6
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 7
August 2001 Rating: 8
February 2002 Rating: 9
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 10. Electrical
a. All broken and loose electrical wiring and fixtures shall be repaired or replaced, along
with any other electrical problems that might immediately endanger children.
b. On a monthly basis, CUSD shall inspect all school facilities and identify any broken
or loose electrical wiring and fixtures or any other electrical problems that might
immediately endanger children. A written record of these monthly inspections shall be
maintained by the State Administrator.
c. On or before September 1, 1999, a licensed electrical inspector shall be retained to
inspect selected school sites identified by plaintiffs’ counsel. The inspector shall be
mutually agreed upon between counsel for the plaintiffs and defendants. The inspector
shall have no prior employment or contracting arrangement with either the CUSD or
the City of Compton. The inspector shall perform inspections as directed by plaintiffs’
counsel and shall be compensated on an hourly basis, not to exceed the total sum of
$50,000.00. The inspector shall prepare an inspection report containing the following
information:
(i) The location of any broken or loose electrical wiring and fixtures, the location
of any other electrical problems that might immediately endanger children.
(ii) The location of other electrical problems that the inspector believes should be
called to the attention of the CUSD.
d. A copy of the inspection report shall be delivered to counsel for plaintiffs and shall be
available for public inspection at the CUSD.
e. In the event the inspection indicates that broken or loose electrical fixtures remain
or that electrical problems that might endanger children or employees exist, the
inspector shall perform follow-up inspections to determine if the problem has been
corrected. The costs of follow-up inspections shall not be charged against the
$50,000.00 allocated pursuant to subsection (c) above.
FCMAT Facilities Management Standard 9.8 was the standard used to monitor the
district’s compliance with Section 10.
Consent Decree
Facilities Management Standard 9.8
Instructional Program Issues - Adequate Lighting, Electrical Service Provided
Professional Standard
All schools shall have adequate lighting and electrical service.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 10) include monthly inspections for electrical problems
conducted by the district with written records of these monthly inspections maintained; an in-
spection before September 1, 1999, conducted by a licensed electrical inspector of sites identified
by plaintiffs’ counsel and a copy of the report delivered to counsel for plaintiffs and available for
public inspection; and the correction of any electrical problems.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district and plaintiffs’ counsel selected a licensed electrician to conduct site inspec-
tions of specific identified sites during the 2000-2001 school year. Inspections were con-
ducted at Compton, Centennial and Dominguez High Schools. All deficiencies identified
during the inspections were addressed. The district has four licensed electricians on staff.
2. Site plant managers have been directed to conduct electrical inspections of their sites on
a daily basis and to immediately report any potentially hazardous electrical condition.
Monthly reports of these electrical inspections are submitted to the facilities division. A
form for the documentation of the reviews was developed, and records of the reports from
the sites are being maintained.
3. HVAC, lighting and electrical systems were included within the scope of the site mod-
ernization project plans which addressed energy conservation in equipment, infrastruc-
ture, and construction. The district utilized $60 million to upgrade electrical components
throughout the district. New transformers, a retrofit of lights and other electrical up-
grades have taken place at several schools. Motion sensors have been installed in many
buildings. More power is now available to the sites, but the sites are utilizing less energy
because of the energy efficient components. Most of the modernization projects are
scheduled to be completed by summer 2006.
4. The newly implemented Williams site reviews have reported no electrical findings.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: 2
August 2000 Rating: 4
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 11. Certificated Teachers
a. A certificated teacher will be present in every classroom on every school day.
b. No violation of subdivision (a) will occur if the following procedures have been
followed:
(i) The CUSD maintains a list of certificated substitute teachers with sufficient
numbers of certificated teachers to meet projected teacher absences.
(ii) CUSD attempted to contact everyone on that list in an effort to secure the
presence of a certificated teacher in the classroom.
(iii) Whenever the list has been exhausted such that CUSD is unable to secure a
certificated substitute teacher, the CUSD has commenced reasonable efforts
to increase the number of certificated substitute teachers on the list who are
willing and able to provide services to the CUSD.
c. In the event a certificated teacher cannot be obtained, the principal shall be
responsible for ensuring that children without a certificated teacher receive
appropriate instruction in accordance with the curriculum for the class.
FCMAT Personnel Management Standard 8.2 was the standard used to monitor the
district’s compliance with Section 11.
Section 12. Absenteeism
a. Due to the high degree of employee absenteeism, it is reasonable and necessary
that CUSD hold all personnel accountable for meeting attendance requirements.
Absenteeism of CUSD employees impedes the ability of CUSD to provide instructional
services to children.
b. The State Administrator will develop a plan to reduce employee absenteeism district-
wide, subject to the requirements of collective bargaining. The absenteeism plan shall
address the issue of employees who are absent from any required staff development
programs.
FCMAT Personnel Management Standard 8.2 was the standard used to monitor the
district’s compliance with Section 12.
Consent Decree
Personnel Management Standard 8.2
Use of Technology
Professional Standard
The Personnel Division provides an automated substitute calling system. The system should have
the ability to input and retrieve data. Data should be distributed to site and program managers.
Consent Decree Stipulations
Sections 11 and 12 of the Consent Decree in the action Serna v Eastin, Case No. BC 174282,
includes the following stipulations: the district is to ensure that certificated teachers are present in
each classroom every day, maintain a list of certificated substitutes in sufficient numbers to meet
teacher absences, develop a plan to reduce employee absenteeism, and hold employees account-
able for meeting attendance requirements.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. A district attendance goal was initiated by the superintendent for the 2002-2003 school
year of 97% attendance for all classroom teachers. This goal was continued for the 2003-
04, 2004-05 and 2005-06 school years.
• At the elementary level the average attendance rate achieved for 2002-03 was
95.72% with four schools exceeding the goal; for 2003-04 it was 96.02% with three
schools exceeding the goal; and for 2004-05 it was 97.27% with two schools ex-
ceeding the goal.
• At the middle school level, the average achieved for 2002-03 was 95.97% with one
school exceeding the goal; for 2003-04 it was 94.74% with no school exceeding the
goal; and for 2004-05 it was 96.57% with no school exceeding the goal.
• At the high school/alternative school level the average achieved for 2002-03 was
95.18% with the Community Day School exceeding the goal; for 2003-04 it was
96.13% with two alternative schools exceeding the goal; and for 2004-05 it was
96.04% with two alternative schools exceeding the goal.
2. Each school addresses staff attendance as part of their school improvement plan. The dis-
trict regularly reports employee absences and reasons for absences to school site manag-
ers to work with their staffs to reduce absenteeism.
3. The Office of Human Resources and Employee Development (HRED) provides substi-
tutes when classroom teachers are absent. HRED increased its pool of substitutes from
approximately 275 substitutes in 2002-03 to approximately 325 substitutes in 2003-04
and approximately 350 in 2004-05. HRED continues to process applications for new
substitutes.
4. Site administrators assign non-instructional certificated staff to substitute when a regular
substitute is not available to cover a teacher’s absence. If no substitute is available, cer-
tificated teachers are first solicited to substitute during their preparation period(s). Depart-
ment chairs, counselors, curriculum specialists, learning support coordinators, assistant
principals and principals are to be used on a rotational basis when other teachers are not
available. Teachers can be recalled from a locally held workshop or conference to return
to school if no substitute is available. At the elementary level, 20% of the students in a
class may be assigned to each of five other certificated teachers for the day.
Consent Decree
5. HRED monitors on a daily basis, the number of classroom teacher absences by site, and
provides weekly reports to the Executive Cabinet and monthly reports to the principals.
6. The district continues to utilize an automated substitute calling system, Substitute Em-
ployee Management System (SEMS).
7. The HRED staff conducts bi-monthly training sessions with new substitute teachers, and
quarterly training for long-term substitutes. Long-term substitutes are also required to
attend staff development offered on-site to regular site teachers.
8. The district has developed a substitute teacher’s training manual for substitute teachers.
9. Substitute teachers are evaluated by regular teachers upon their return from an absence.
Substitutes are terminated upon receipt of a third negative report.
10. The district continues to demonstrate safety consciousness by requiring all district em-
ployees to wear a district-issued identification badge.
11. All high schools issue identification badges for their students.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 4
August 1999 Rating: Not Reviewed
February 2000 Rating: 6
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
0 Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 13. Homework
a. The CUSD has adopted a homework policy.
b. The State Administrator shall ensure that the homework policy is implemented at
every school site. The State Administrator shall require that the principal of each
school certify in writing on a monthly basis that the homework policy is being
followed at each school, or if it is not being followed, that disciplinary proceedings
have been commenced against personnel not complying with the homework policy.
c. At the beginning of each semester, parents shall receive information on the homework
policy and shall be requested to sign an acknowledgement of the receipt of such
policy. If the parent fails to return the acknowledgement form to the district, the
district will make one attempt to contact the parent by telephone regarding the
homework policy.
FCMAT Pupil Achievement Standards 1.2 and 1.11 were the standards used to monitor the
district’s compliance with Section 13.
Consent Decree
Pupil Achievement Standard 1.2
Student Objectives - Core Curriculum Content
Professional Standard
The district has clear and valid objectives for students, including the core curriculum content.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 13) include a monthly certification from the site principal
that a homework policy is implemented at each site, and that information about the policy is sent
to parents each semester and parents acknowledge receipt of the notification.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district’s homework policy is included in the Student and Parent/Guardian Hand-
book distributed at the beginning of each school year. The district complies with Section
13 of the Consent Decree by sending notification home to parents twice per year, through
the Student and Parent/Guardian Handbook and through a letter disseminated at the
second semester. Parents must acknowledge receipt of the Student and Parent/Guardian
Handbook. Parent acknowledgements of receipt of the handbook are maintained at the
site. A monthly certification by site principals that the homework policy is being imple-
mented continues to be a required submission to the district office to meet compliance.
2. The district has clear goals and objectives for student performance and improvement.
3. The district’s governing board has revised its mission statement and goals and developed
a new district logo. The mission statement and goals are reiterated on district documents.
4. All curriculum guides are aligned to state content standards. The curriculum guides are
available on the district’s web site and on CD-ROM.
5. The ELD curriculum guide has been completed and K-12 ELD performance benchmarks
have been developed. Open Court Pacing Guides have been used to ensure full imple-
mentation of the reading program across the district in grades K-5. The pacing guides
have been aligned to the curriculum guides. Teacher leaders have been assigned at each
school site to work with the teachers.
6. K-3 teachers at eleven schools are receiving coaching/training in the Reading First pro-
gram.
7. Student academic performance remains a district concern and focus of improvement.
Three district schools are SAIT schools requiring the assistance of School Assistance and
Intervention Teams such as the Principals Exchange, Education Redesign and Assess-
ment, and the Professional Resources Network. Data is being used to drive curriculum
and school improvement. English Language Learners, as a sub-group, are meeting the
Adequate Yearly Progress (AYP) goals but the African-American students, as a subgroup,
are not meeting the AYP at many sites.
Consent Decree
8. Two additional schools are state-monitored schools under the High Priority Schools
program. Eight schools are in program improvement year 4. The district has also been
identified as a program improvement district.
9. The number of students in the high school Advanced Placement (AP) program has in-
creased significantly and course offerings have increased to fifteen subjects. 426 stu-
dents participated in AP courses during the 2004-05 school year and 521 AP exams were
administered in spring 2005.
10. The district has developed a high school academic planner and course catalog to assist
students in meeting requirements for graduation and in developing career plans. Comple-
tion of a Senior Portfolio is now a graduation requirement.
11. The district received a $35,000 grant from Boeing to work in collaboration with Compton
Community College to improve high school science and math programs.
12. The UC Irvine FOCUS project, funded by the National Science Foundation, assists
Compton USD in improving math and science instruction.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: 2
February 2000 Rating: 3
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 8
August 2003 Rating: 9
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Pupil Achievement Standard 1.11
Students Engaged in Learning
Professional Standard
Students are engaged in learning and they are able to demonstrate and apply their knowledge and
skills.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 13) include a homework policy implemented at each
site with a monthly certification from the site principal that this is occurring, information sent to
parents each semester and parent acknowledgment of the notification.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district’s homework policy is included in the Student and Parent/Guardian Hand-
book distributed at the beginning of each school year. The district complies with Section
13 of the Consent Decree by sending notification home to parents twice per year, through
the Student and Parent/Guardian Handbook and through a letter disseminated at the
beginning of the second semester. Parents must acknowledge receipt of the Student and
Parent/Guardian Handbook. Parent acknowledgements of receipt of the handbook are
maintained at the site. A monthly certification by site principals that the homework policy
is being implemented continues to be a required submission to the district office to meet
compliance.
2. Students have many opportunities in which to demonstrate their accomplishments
through family-oriented district sponsored exhibitions and programs such as MESA,
AVID, Student Leadership Conferences, Portfolio Day (grades 2-8), Puente, the K-12
math and science fair, the elementary schools (grades 2-5) spelling bee, and oratorical
contests.
3. The number of students participating in Advanced Placement (AP) courses in the dis-
trict’s three high schools has increased significantly. In 2005-06 the district had 482
students participating in AP courses.
4. Many high school students are concurrently enrolled in community college courses.
5. The district has initiated the Plato Learning software program to assist high school stu-
dents in making up course credits. The program is standards based.
6. The district annually conducts a survey of graduating seniors to determine their post high
school plans. Of the 946 seniors of the graduating class of 2005 who responded to the
survey, 625 students indicated that they had plans to attend a college or university, 32 in-
dicated they would join the military, 74 indicated they would attend a vocational school,
and 215 indicated “other” or work.
Consent Decree
7. 41 graduating seniors from the class of 2005 were accepted to the University of Califor-
nia (UC) system and 232 seniors were accepted to the California State University (CSU)
system. Seventeen students indicated they will attend a private or out of state college and
388 students indicated plans to attend community college. Scholarship students and their
parents were recognized by the district at a Senior Banquet in their honor.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: 3
August 2000 Rating: 4
February 2001 Rating: 5
August 2001 Rating: 5
February 2002 Rating: 6
August 2002 Rating: 7
February 2003 Rating: 7
August 2003 Rating: 8
February 2004 Rating: 8
August 2004 Rating: 9
February 2005 Rating: 9
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 14. Security Plan
a. The State Administrator shall develop a district-wide security plan which addresses
both the safety of students and employees and the protection of District property.
In developing the security plan, the Statewide Administrator shall form a Security
Committee consisting of (a) a member of the Advisory Board, (b) a teacher selected
by the Compton Education Association, (c) a principal selected by the State
Administrator, and (d) four parents nominated by counsel for the plaintiffs and
approved by the State Administrator. In addition, the State Administrator shall consult
with local law enforcement agencies regarding the security plan and invite such
agencies to participate in the Security Committee.
b. The Security Committee shall review the implementation of the plan and make
recommendations for its improvement. It will meet with the State Administrator on a
quarterly basis. An annual public hearing will be held before the Advisory Board to
review the plan.
c. The plan developed by the State Administrator shall include a program to encourage
the voluntary participation of parents in school security patrols. The program will
include the training of parents and appropriate provisions to indemnify and hold
participants harmless from any personal liability for their participation in the school
security patrols.
FCMAT Facilities Management Standard 1.3 was the standard used to monitor the
district’s compliance with Section 14.
Consent Decree
Facilities Management Standard 1.3
School Safety - Plan for Protection of People and Property
Legal Standard
Demonstrate that a plan of security has been developed which includes adequate measures of
safety and protection of people and property. [EC 32020, 32211, 35294-35294.9, 39670-39675]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 14) include the development of a district-wide security
plan, the establishment of a district security committee that reviews implementation of the secu-
rity plan, providing an annual public hearing before the board, the encouragement of voluntary
participation of parents in school security patrols and training for parents.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district has a district-wide security plan, and the district-wide safety committee
meets semi-annually to review school safety issues.
2. Parent volunteers continue to be solicited to participate on district and site committees.
School site safety committees continue to determine site safety concerns and recommend
remedial action to the school administrator and the district office. Documentation of
committee meetings and agendas are verified.
3. Williams settlement complaint forms are available for parents to note any facilities con-
cerns to the district.
4. Security alarms are in place in all district schools. The security alarms are monitored by
Advance Alarm. Board action in April 2004 provided approval for removal and replace-
ment of intrusion alarms throughout the district. The company notifies district Police
Services whenever an alarm is triggered.
5. Signs are posted on each campus warning against trespassing, and directing visitors to
report to the administration office.
6. The district participates in the WE-TIP program, an anonymous telephone tip line for
community members to report property crimes against the district. Information on the
WE-TIP program is posted, along with the number 1-800-78-CRIME. The WE-TIP pro-
gram provides rewards up to $1,000.
7. The district and community have established an emergency command center, located at
the district police services office, to prepare for and respond to school and community
emergencies and/or disasters. An emergency drill was conducted in spring 2005. A
Code Yellow drill procedure has been developed and practice school drills have been
conducted, most recently in fall 2005.
Consent Decree
8. The Los Angeles county received a $6 million Homeland Security Grant, of which the
district received approximately $300,000 to upgrade its security equipment such as ra-
dios, bullet proof vests, first aid kits for each site and emergency preparedness containers
for each school cluster and individual sites.
9. The district received approximately $90,000 from the Emergency Response and Crisis
Management grant applied for collaboratively with neighboring districts. These funds
were used to update the current school emergency plan with new technology and sup-
plies. A computerized system is being completed that will link each school site to the
District’s Emergency Operations Center and Police Department. The district has also
applied for the Safe Schools and Healthy Students grant.
10. Additional emergency response training has been provided to a number of district em-
ployees.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 5
August 1999 Rating: 6
February 2000 Rating: 7
August 2000 Rating: 7
February 2001 Rating: 8
August 2001 Rating: 8
February 2002 Rating: 9
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
0 Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 15. Emergency Drills
a. By September 1, 1999, the State Administrator shall certify that every school site has
the fire warning system required by Education Code Section 32001.
b. The State Administrator shall certify that every school site has an earthquake
emergency procedure system in accordance with Education Code Sections 35296 and
35297.
c. In accordance with Education Code Section 32001, monthly fire drills shall be
conducted at the elementary and intermediate school levels and not less than twice
yearly at the secondary level.
d. In accordance with Education Code 35297, earthquake drop procedures shall be
practiced at least once each school quarter in elementary and intermediate school
levels and at least once a semester at the secondary level.
e. The State Administrator shall require that each principal maintain a written log of fire
drills and earthquake drop procedures. The written log shall be on the form developed
by the State Administrator. The written log shall be available for inspection by the
public. The State Administrator shall periodically conduct reviews to ensure that the
log is being maintained.
FCMAT Facilities Management Standard 1.9 was the standard used to monitor the
district’s compliance with Section 15.
Consent Decree
Facilities Management Standard 1.9
School Safety - School Site Emergency Procedures Plan
Legal Standard
Each public agency is required to have on file written plans describing procedures to be em-
ployed in case of emergency. [EC 32000-32004, 32040, 35295-35297, 38132, 46390-46392,
49505, GC 3100, 8607]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 15) include that each school site has a fire warning sys-
tem by September 1, 1999, that each school site has an earthquake emergency procedure system,
that fire drills and earthquake drop procedures are conducted according to Education Code, that
written logs of fire and earthquake drop drills are maintained, that the written logs are available
for public inspection and that the State Administrator conduct periodic reviews to ensure the log
is being maintained.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. Written emergency plans are available at the school sites for earthquakes and other disas-
ters. School site safety plans include fire evacuation plans, bomb threats or disturbances,
code yellow drills and staff assignments in cases of emergencies. The availability of the
school’s site plan is checked during site visitations by district personnel.
2. Schools are required to conduct emergency drills according to Education Code and to
maintain records of drills conducted. The school’s records are reviewed by district per-
sonnel. Periodic, unannounced site visits are conducted by FCMAT to review the written
logs of the scheduled drills held on the campus.
3. All schools have a fire alarm system in place. Most of the schools have a strobe fire alarm
system in addition to the bells.
4. The district has worked with the city to establish a community level disaster response
team. The district and city have established the district police services office as the Emer-
gency Operations Center (EOC). The EOC is operational. A Code Yellow drill procedure
has been developed and practice school drills have been conducted, most recently in fall
2005.
5. The Los Angeles county received a $6 million Homeland Security Grant, of which the
district received approximately $300,000 to upgrade its security equipment such as ra-
dios, bullet proof vests, first aid kits for each site and emergency preparedness containers
for each school cluster and individual sites.
6. The district received approximately $90,000 from the Emergency Response and Crisis
Management grant applied for collaboratively with neighboring districts. These funds
were used to update the current school emergency plan with new technology and sup-
plies. A computerized system is being completed that will link each school site to the
District’s Emergency Operations Center and Police Department. The district has also
applied for the Safe Schools and Healthy Students grant.
Consent Decree
7. Additional emergency response training has been provided to a number of district em-
ployees.
8. The district responds to facilities emergencies that are called in to the district office on the
emergency hot line as rapidly as possible.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 3
August 1999 Rating: 3
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 16. Litter
a. All schools will remain clean and operational and free from graffiti.
b. All playground equipment that is currently unusable will either be repaired or
removed within thirty (30) days of the effective date of this Consent Decree.
Playground equipment that becomes unusable in the future shall be repaired or
removed within thirty (30) days of its becoming unusable.
c. At the start of each school week, the school shall be free of litter. All litter will be
removed on a daily basis while school is in session.
d. Each school site shall develop a community service program in which all children are
encouraged to perform five hours per semester of community service in supervised
litter removal or recycling programs on school facilities or in the neighborhood
surrounding the school site.
FCMAT Facilities Management Standards 1.8 and 1.14 were the standards used to monitor
the district’s compliance with Section 16.
Consent Decree
Facilities Management Standard 1.8
School Safety - Graffiti and Vandalism Abatement Plan
Professional Standard
The district has a graffiti and vandalism abatement plan. The district should have a written graf-
fiti and abatement plan that is followed by all district employees. The district provides district
employees with sufficient resources to meet the requirements of the abatement plan.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 16) include that all schools are clean and free from graf-
fiti, that unusable playground equipment is removed or repaired, that schools are free of litter and
that a community service program of five hours per semester has been developed for students.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district’s graffiti abatement program is one of immediate removal and remains a
major district priority and ongoing concern. Monitoring by on-site staff remains key to
eliminating graffiti.
2. School custodial staffs target graffiti as a priority for removal every day. Site custodians
are responsible for removing graffiti located in areas less than ten feet in height and/or
requiring less than one hour to remove. District maintenance is assigned to remove graf-
fiti in areas higher than ten feet in height or requiring more than one hour to remove.
3. The district has established an emergency “hot line” (310-639-4321, extension 55377)
for the reporting of graffiti that the school custodians cannot handle.
4. The district responds speedily to reports of vandalism. The maintenance department
works cooperatively with the district’s police services to provide cost estimates of any
damage to district property to assist in seeking restitution from the perpetrators.
5. Periodic, unannounced school visits continue to be conducted by district administrators
and FCMAT to monitor compliance with the consent decree stipulations. The elemen-
tary and middle school campuses are clean and graffiti-free. The high school campuses
remain a constant challenge for staff.
6. The district has changed the high school graduation requirements to include a required
2.5 credits of community service for students to meet prior to graduation. The course
requirement is the equivalent of 45 hours, or one quarter of a year’s credits. Students
who graduate in 2006 will need to meet this graduation requirement. In other community
service activities, students at various sites are engaged in numerous campus beautifica-
tion projects and recycling programs.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 6
August 1999 Rating: 6
February 2000 Rating: Not Reviewed
August 2000 Rating: 7
February 2001 Rating: 7
August 2001 Rating: 8
February 2002 Rating: 9
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Facilities Management Standard 1.14
School Safety - Sanitation is Maintained and Fire Hazards are Corrected
Legal Standard
Sanitary, neat and clean conditions of the school premises exist and the premises are free from
conditions that would create a fire hazard. [CCR Title 5 633]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Sections 16 and 18) include that all schools are clean and free
from graffiti, that unusable playground equipment is removed or repaired, that schools are free
of litter and that a community service program of five hours per semester has been developed for
students; other stipulations include establishing site committees to inventory and prioritize repair
and maintenance needs, and reporting to the State Administrator and board at least once a semester.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. Plant managers have been instructed to perform daily inspections of their site to ensure
a clean, sanitary and safe environment for staff and students. Plant Managers submit a
monthly Custodial Inspection report to the Maintenance Department.
2. School site safety committees continue to make periodic site inspections, and monitor
facilities needs at the school. Williams settlement complaint forms are available for par-
ents to report any facilities concerns.
3. Unannounced site inspections are conducted by the district Facilities Compliance Co-
ordinator. Sites are inspected by Williams review teams from the Los Angeles County
Office of Education.
4. Random, unannounced site inspections continue to keep staff focused on maintaining the
cleanliness of the school sites.
5. Principals, or their designees, are required to inspect student restrooms three times daily
and to take action to remedy any problems.
6. A FCMAT site inspection checklist is used in the site inspection process, and a letter
grade is given to a school based on the number of checklist criteria met.
7. Sites are free from fire hazards. Hazardous conditions have been addressed by the district
in earlier progress reviews. If a random site inspection turns up any potential new hazard,
it is addressed by the district maintenance staff right away.
8. All schools have an operational fire alarm system in place. Several schools have a strobe
alarm system in addition to bells.
9. Any unusable playground equipment was long ago removed or repaired by the district in
response to the Consent Decree.
10. Custodial staffs receive structured monthly training to improve site safety and cleanli-
ness, and are directed to keep storage areas clean and exits free of obstructions.
11. Both classified and certificated staffs remain responsible for addressing the daily removal
of litter.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: 4
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
0 Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 17. Drinking Water
a. Drinking water will be readily available to all school children.
FCMAT Facilities Management Standard 8.10 was the standard used to monitor the
district’s compliance with Section 17.
Consent Decree
Facilities Management Standard 8.10
Facilities Maintenance and Custodial - Adequate Repair and Supervision of
School Buildings
Legal Standard
The governing board shall keep the school buildings in repair and supervised. [EC 17593]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
An additional related stipulation (Section 17) includes that drinking water will be readily avail-
able to all students.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district governing board has established a board sub-committee of two board mem-
bers and district staff to regularly monitor district facilities. The sub-committee meets
monthly.
2. Ongoing, random, unannounced site inspections keep staff focused on campus cleanli-
ness and the safe condition of school site facilities.
3. The district Facilities Compliance Coordinator visits the sites and uses the FCMAT in-
spection checklist to monitor compliance with Consent Decree stipulations. Exit confer-
ences are held with the site administrators. Schools are given a letter grade based on the
monitoring checklist.
4. Drinking water is readily accessible to students. The condition of student drinking foun-
tains is checked during monthly site inspections. Inoperable fountains are reported to
maintenance staff for correction.
5. The district maintains contracts for annual water service to check all water lines and test
for water potability and toxic substances.
6. Repair work on site facilities is continuous.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 2
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 18. Site Committees
a. At each school site, a committee shall be established for the purpose of conducting
an inventory and prioritization of repair and maintenance needs and for performing
other obligations required by this Consent Decree. Existing school site committees
may be used for this purpose so long as their membership is augmented to meet the
requirements of this Section.
b. Composition of the committee.
i. At least sixty percent parents of students attending the school. Such parents
will be selected randomly from among those parents expressing an interest in
participation after notice of the opportunity has been distributed to all parents
at the school.
ii. The remainder shall be composed of administrators, teachers, classified
employees, and interested members of the surrounding community.
c. The site committee shall be constituted at each school within sixty (60) days of the
effective date of this Consent Decree.
d. At least once each semester, the site committee shall prepare a report to the State
Administrator and Advisory Board concerning repair and maintenance needs at the
school.
e. The site committees shall be chaired by a parent who has been trained in committee
and meeting management.
FCMAT Facilities Management Standards 1.12, 1.14, and 9.11 were the standards used to
monitor the district’s compliance with Section 18.
Consent Decree
Facilities Management Standard 1.12
School Safety - Inspection and Correction of Unsafe Conditions
Legal Standard
Building examinations are performed, and required actions are taken by the governing board
upon report of unsafe conditions. [EC 173679(a)]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Sections 9 and 18) include replacing boarded-up windows, re-
placing broken windows within 72 hours, affixing a date and time to temporary material placed
on broken windows, establishing site committees to inventory and prioritize repair and mainte-
nance needs, and reporting to the State Administrator and board at least once a semester.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. Facilities inspections are regularly performed by site and district staff and required action
taken upon any report of unsafe conditions.
2. Plant managers are instructed to conduct daily inspections of the site and to immediately
report any unsafe condition.
3. District personnel conduct periodic, unannounced school site visitations on a monthly
basis to monitor conditions of school facilities. Schools receive a letter grade based on a
criteria checklist developed by FCMAT.
4. The district continues to comply with the speedy replacement of broken windows. The
General Obligation Bond for facilities improvements has allowed the district to replace
older windows and frames.
5. Schools have organized parent safety committees at each site. The committees periodi-
cally perform site inspections for unsafe or hazardous conditions and forward repair
requests to the maintenance department to address. The district has also implemented
the Williams settlement protocols providing complaint forms for parents to report their
concerns about facilities conditions.
6. The district continues to utilize a maintenance request flow chart and forms to track all
maintenance requests from the sites. Logs of the maintenance requests are kept for each
school. Individual sites receive copies of all responses to the requests generated by the
site.
7. The maintenance department continues to immediately address emergency calls to the
maintenance hot line (310-639-4321, extension 55377).
Consent Decree
8. Plant managers have been directed to conduct electrical inspections of their site on a
daily basis and to report, in writing, any potentially hazardous electrical condition. A
monthly form for the documentation of these reviews was developed, and records of the
reports from the sites are being maintained.
9. Monthly training meetings are held with the plant managers on district procedures and/or
on improving employee skills.
10. Williams review teams from the Los Angeles County Office of Education conduct site
reviews. Any noted deficiencies are promptly addressed by district staff.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 6
August 1999 Rating: 6
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 7
August 2001 Rating: 8
February 2002 Rating: 9
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Facilities Management Standard 1.14
School Safety - Sanitation is Maintained and Fire Hazards are Corrected
Legal Standard
Sanitary, neat and clean conditions of the school premises exist and the premises are free from
conditions that would create a fire hazard. [CCR Title 5 633]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Sections 16 and 18) include that all schools are clean and free
from graffiti, that unusable playground equipment is removed or repaired, that schools are free
of litter and that a community service program of five hours per semester has been developed for
students; other stipulations include establishing site committees to inventory and prioritize repair
and maintenance needs, and reporting to the State Administrator and board at least once a semes-
ter.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. Plant managers have been instructed to perform daily inspections of their site to ensure
a clean, sanitary and safe environment for staff and students. Plant Managers submit a
monthly Custodial Inspection report to the Maintenance Department.
2. School site safety committees continue to make periodic site inspections, and monitor fa-
cilities needs at the school. Williams settlement complaint forms are available for parents
to report any facilities concerns.
3. Unannounced site inspections are conducted by the district Facilities Compliance Coordi-
nator. Sites are inspected by Williams review teams from the Los Angeles County Office
of Education.
4. Random, unannounced site inspections continue to keep staff focused on maintaining the
cleanliness of the school sites.
5. Principals, or their designees, are required to inspect student restrooms three times daily
and to take action to remedy any problems.
6. A FCMAT site inspection checklist is used in the site inspection process, and a letter
grade is given to a school based on the number of checklist criteria met.
7. Sites are free from fire hazards. Hazardous conditions have been addressed by the district
in earlier progress reviews. If a random site inspection turns up any potential new hazard,
it is addressed by the district maintenance staff right away.
8. All schools have an operational fire alarm system in place. Several schools have a strobe
alarm system in addition to bells.
9. Any unusable playground equipment was long ago removed or repaired by the district in
response to the Consent Decree.
10. Custodial staffs receive structured monthly training to improve site safety and cleanli-
ness, and are directed to keep storage areas clean and exits free of obstructions.
11. Both classified and certificated staffs remain responsible for addressing the daily removal
of litter.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: 4
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Facilities Management Standard 9.11
Instructional Program Issues - Facilities Reflect Community Standards and
Expectations
Professional Standard
Facilities within the CUSD reflect the standards and expectations established by the community.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 18) include establishing site committees to inventory and
prioritize repair and maintenance needs, and reporting to the State Administrator and board at
least once a semester.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district continues to involve community members and parents in various facilities
decisions. A representative community committee assisted in the development of the
district’s Comprehensive Facilities Master Plan.
2. The district facilities committee was involved in planning for two new elementary
schools, including Clinton Elementary, and in promoting passage of the district’s general
obligation bond, Measure I.
3. The district continues to keep parents and the community informed of projects and facili-
ties improvements in the schools. The district is currently conducting town hall meetings
with community members to address any concerns regarding facilities.
4. The facilities division has initiated a quarterly newsletter and uses the district web site to
update the community and staff on the status of facilities projects.
5. Site safety committees have been established at each school site. The composition of the
committees is specified in the consent decree and should be composed largely of parents
(60%). The committees are responsible for periodically inspecting their school sites and
identifying repair and maintenance priorities. Copies of agendas and minutes are checked
during periodic, unannounced visits to the school sites.
6. A board retreat was conducted in the first week of January 2006 to update the newly
seated board on facilities issues. The board has established a sub-committee of two
board members and district staff to monitor facilities conditions. The board sub-commit-
tee meets monthly.
0 Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: 2
August 2000 Rating: 4
February 2001 Rating: 4
August 2001 Rating: 5
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 9
August 2003 Rating: 9
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 19. Student Promotion
a. The State Administrator shall develop a draft policy concerning the retention and
promotion of students (“promotional policy”).
b. In drafting the policy, the State Administrator shall consult with the Advisory Board
and with the site committees.
c. Upon completion of the draft promotional policy, one or more public meetings will be
convened to secure the input of parents. Plaintiffs’ counsel shall assist the CUSD in
securing broad parental participation at the public meeting(s).
d. Plaintiffs’ counsel shall provide the State Administrator with written comments on the
draft promotional policy prior to the first public meeting required by subdivision (c).
FCMAT Pupil Achievement Standards 1.5 and 1.16 were the standards used to monitor the
district’s compliance with Section 19.
Consent Decree
Pupil Achievement Standard 1.5
Preparation of Students - Expectations and Practices
Professional Standard
Expectations and a practice exist to improve the preparation of students and to build a school
structure with the capacity to serve all students.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 19) include the development of a district policy on stu-
dent promotion and conducting parent meetings to obtain input to the policy.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The promotion/acceleration/retention policy, Policy No. 5123, was revised and adopted
on April 11, 2000. Information on the policy is distributed annually to parents through
the Student and Parent/Guardian Handbook.
2. District graduation requirements were revised to align them to the state graduation re-
quirements and the UC and CSU A through G requirements.
3. The district has implemented several intervention programs to address low student per-
formance. Students at the high school who fail a first semester course have to repeat the
failed portion of the course before moving on to the second semester level. After school
tutorials and Saturday school are provided at all high schools for students who did not
pass the CAHSEE high school exit exam. On-line remediation courses have also been
made available at Centennial High School.
4. The district provides a network of supplemental services for students having academic
difficulties. After school and Saturday programs are available to all students. Summer
school has been made mandatory for failing students. However, 2005 summer school
offerings were limited to specific sites during the district’s extensive modernization proj-
ects.
5. Bell schedules for schools have been modified to provide additional time that is
“banked” for staff professional development activities. Twenty minimum Instructional
days are thus built into the school year schedule for staff meetings and in-service train-
ing. Minimum days were moved from Mondays to Wednesdays. Minimum days are used
for cluster meetings, grade level meetings, Reading First and other professional develop-
ment activities. All professional development activities are focused on the improvement
of instruction and student achievement.
6. New and inexperienced teachers meet regularly with PAR teachers and personnel staff
members for assistance with classroom management and curriculum and instruction.
7. Principals are required to spend a minimum of 20 percent of the school day in class-
rooms or working with teachers on instructional improvement.
8. Central office administrators provide assistance in the monitoring of curriculum delivery.
Cabinet members visit the school sites each week (Wednesday).
Consent Decree
9. In 2004-05, 14 district schools met their Adequate Yearly Progress (AYP) goals in Eng-
lish language arts, 24 met their AYP goals in math, and 10 schools met all AYP compo-
nents. 35 of the 40 schools met their Academic Performance Index (API) targets. The
district is working to improve the schools that have not made Adequate Yearly Progress
(AYP) for several years, identified as Program Improvement (PI) schools. 26 schools are
in Program Improvement: 4 schools in year one, 11 schools in year two, 3 schools in year
three, and 8 schools in year five. Three district schools are in the last year of the School
Assistance and Intervention Team (SAIT) program. Centennial High School exited the
SAIT program.
10. Four schools have exited the Immediate Intervention/Underperforming Schools Program
(II/USP) and no schools are currently in II/USP.
11. The district is focused on improving student academic performance and has developed
an internal instructional audit process, detailed in an Instructional Audit Handbook, to
monitor effective program implementation at the schools. Visiting teams of four or more
administrators visit each of 12 sites for one day during the first quarter, with two to three
visitations occurring in the next three quarters. Visits to the first 12 sites were conducted
in November 2004. Second visits were conducted in February 2005 and third visits in
May 2005. Visits for the 2005-06 year were conducted in December and January, with
follow-up visits scheduled for February and March.
12. The Curriculum and Instruction staff was expanded in 2005-06 to include a Director of
C&I, three resource teachers for English, Writing, and English Learners, and a social
studies resource teacher through the American History Grant.
13. The district’s internal instructional audit process also addresses the Office for Civil
Rights and Comité compliance requirements.
14. Students are honored for their academic achievements at Board meetings.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: 3
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 5
August 2001 Rating: 5
February 2002 Rating: 6
August 2002 Rating: 6
February 2003 Rating: 7
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 9
August 2005 Rating: 9
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Pupil Achievement Standard 1.16
Common Vision - Practice
Professional Standard
A common vision of what all students should know and be able to do exists and is put into prac-
tice.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 19) include the development of a district policy on stu-
dent promotion and conducting parent meetings to obtain input to the policy.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The promotion/acceleration/retention policy, Policy No. 5123, was revised and adopted
on April 11, 2000. Information on the policy is distributed annually to parents through
the Student and Parent/Guardian Handbook.
2. Staff development training in the curricular standards for each core subject focuses
teachers on what they are expected to do in teaching the instructional content, and rein-
forces standards-based instruction.
3. Eleven district schools received Reading First grants providing funds for early interven-
tion with special needs students.
4. Each site has developed a Single Site Plan for Student Achievement that identifies all
support and supplemental services provided to the students. Each site plan has a mission
statement and delineates instructional goals of what all students should know and be able
to do.
5. All curriculum guides are aligned with the content standards.
6. High School graduation requirements are clearly defined in the Student and Parent/
Guardian Handbook. The document, A High School Academic Planner and Course
Catalogue, has been developed to assist students in meeting graduation requirements and
in career planning.
7. Course catalogues for grades 9-12 have been updated. Course catalogues for middle
school grades have been developed.
8. Report cards for grades K-5 reflect content and performance standards.
9. A Master Plan for English Language Learners has been approved by the governing board
and the state department. The plan has been updated to reflect current data. The English
Language Development curriculum has been completed for K-12.
10. The district technology plan has been approved by the state and is being implemented
by the district. Eight schools are participating in a consortium targeting middle school
wireless connections. A Title I Enhancing Educational Technology (ETT) grant of $1.7
million has been received by the district.
Consent Decree
11. The district is focused on improving student academic performance and has developed
an internal instructional audit process, detailed in an Instructional Audit Handbook, to
monitor effective program implementation at the schools. Visiting teams of four or more
administrators visit each of 12 sites for one day during the first quarter, with two to three
visitations occurring in the next three quarters. Visits to the first 12 sites were conducted
in November 2004. Second visits were conducted in February 2005 and third visits in
May 2005. Visits for the 2005-06 year were conducted in December and January, with
follow-up visits scheduled for February and March.
12. The district’s internal instructional audit process also addresses the Office for Civil
Rights and Comité compliance requirements.
13. The district reported that ten elementary schools are involved with America’s Choice
Training, and the English teachers at the three high schools are taking the Writing Train-
ing with America’s Choice.
14. The Curriculum and Instruction staff was expanded in 2005-06 to include a Director of
C&I, three resource teachers for English, Writing, and English Learners, and a social
studies resource teacher through the American History Grant.
15. A content area coach has been provided for the schools in the School Assistance and
Intervention Team (SAIT) program.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: 4
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 6
August 2002 Rating: 6
February 2003 Rating: 7
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 9
August 2005 Rating: 9
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 20. CBEST
a. Any teacher hired after November 20, 1997, will be employed for no more than two
years without passing CBEST.
b. Each year the State Administrator will produce a public report which will identify
every teacher employed by the CUSD who does not have a clear credential and how
long the employee has been employed.
c. No new teacher will be retained for more than three years if he or she does not obtain
a preliminary credential.
d. The State Administrator shall develop and implement an incentive program to
encourage teachers to obtain a clear credential and to continue their employment with
CUSD once they have obtained such credential.
FCMAT Personnel Management Standard 3.10 was the standard used to monitor the
district’s compliance with Section 20.
Consent Decree
Personnel Management Standard 3.10
Certificated Recruitment and Selection
Legal Standard
The district limits the number of certificated persons on CBEST waiver. [EC 44252.5]
Consent Decree Stipulations
Section 20 of the Consent Decree in the action Serna v Eastin, Case no. BC 174282, includes the
following stipulations: the district is to identify teachers without clear credentials, produce a pub-
lic report, monitor teachers who have not passed CBEST, release teachers who have not passed
CBEST after two years or who have not obtained a preliminary credential after three years, and
provide an incentive program to teachers to obtain an appropriate credential.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district accepts CBEST waivers only if credentialed teachers are not available for the
hard-to-fill special education positions.
2. The percent of total teaching staff with clear credentials continues to increase. Percent-
ages of the district’s regular teachers who are credentialed:
• In January 2006, 85.81% of the district's regular teachers were credentialed, 7.6%
were Interns, .78% were on emergency permits, two teachers were on unit waivers,
and two teachers were on CBEST waivers.
• In June 2005, 77.90% of the district’s regular teachers were credentialed, 17.78%
had Intern credentials, 1.93% had Pre-Intern Certificates and 2.38% had emergency
permits.
• In January 2005, 74.79% were credentialed, 20.16% had Intern credentials, 2.26%
were second year Pre-Interns, and 2.80% had emergency permits.
• In June 2004, 66.40% were credentialed, 23.19% had Intern credentials, 5.91% had
pre-Intern certificates, 4.43% had emergency permits, and 0.07% had pupil person-
nel services waivers.
• In January 2004, 63.21% were credentialed, 25% had Intern credentials, 7% had
pre-Intern certificates and 5% had emergency permits.
3. Percentages of the district’s special education teachers with credentials:
• In January 2006, 50.47% of the district's special education teachers were creden-
tialed, 11.21% were Interns, 20.56% were Provisional Interns, 4.67% were on
emergency permits, 9.35% were on temporary certificates and two teachers were
on waivers.
• In June 2005, 43.93% of the district’s special education teachers were credentialed,
25.23% had Intern credentials, 6.54% had Pre-Intern Certificates, 16.82% had emer-
gency permits, and 3.74% or four teachers had SDC waivers. Four teachers also
had waivers for both SDC and CBEST.
• In January 2005, 39.81% were credentialed, 21.36% had Intern credentials, 10.68%
had Pre-Intern certificates, 14.56% had Emergency Permits, 7.77% had SDC waiv-
ers, and 5.82% had SDC and CBEST waivers.
0 Consent Decree
• In June 2004, 32.43% were credentialed, 16.22% had Intern credentials, 25.23%
had pre-Intern certificates, 15.32% had emergency permits, 3.60% had SDC waiv-
ers, 1.80% had SDC and CBEST waivers, and 5.40% had CBEST waivers.
4. All teachers are required to meet subject matter competency requirements under the No
Child Left Behind Act.
5. The district provides a differentiated salary schedule, paying credentialed teachers at a
higher level than noncredentialed teachers, providing a strong incentive for teachers to
become credentialed as quickly as possible.
6. Although Teaching as a Priority (TAP) funds, which provided incentives for recruiting
and retaining credentialed teachers in the district, are no longer available, the district has
allotted other district funds such as Title I and Title II program funds to provide incen-
tives to recruit fully credentialed teachers to the district. The district offers an $11,000
signing bonus to fully credentialed teachers of mathematics or science for a two-year
teaching commitment in the district.
7. The Beginning Teacher Support and Assessment Program (BTSA) provides coaching
support to first and second year probationary teachers.
8. The district continues to comply with the Consent Decree stipulation to identify teachers
without clear credentials, to monitor teachers who have not passed the CBEST, and to
release teachers who have not passed CBEST after two years. Monthly reports indicat-
ing the number and percent of credentialed and noncredentialed teachers in the district
are generated by the Human Resources and Employee Development Department and are
periodically presented to the board.
9. The HR department added a recruiter position in February 2005 to attend career fairs to
recruit and hire applicants in hard-to-fill areas.
10. In June 2005 the superintendent informed all K-12 teachers of the requirement to obtain
English Learner authorization. Under the Williams v State of California settlement, a
teacher who is assigned to teach a class with more than 20% English Learner pupils in the
class must have an EL authorization. Under Education Code requirements, a teacher with
any English Learner pupils in the class must have an EL authorization.
• Among all district certificated personnel including management, 51% currently
have EL authorization, and 24% are in training.
• Among classroom teachers, 50% have EL authorization and 27% are in training.
11. The district has required all site administrators to obtain EL authorization and has given
them two years in which to do so.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 8
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 8
February 2001 Rating: 8
August 2001 Rating: 9
February 2002 Rating: 10
August 2002 Rating: 10
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 21. Food Service
The results of any inspection by the Los Angeles County Health Department shall be shared with
the site committee at the school where the food service facility is located.
FCMAT Facilities Management Standard 9.3 was the standard used to monitor the
district’s compliance with Section 21.
Consent Decree
Facilities Management Standard 9.3
Instructional Program Issues - Lunch Areas are Warm, Healthful and Safe
Legal Standard
The governing board shall provide a warm, healthful place in which children who bring their
own lunches to school may eat their lunch. [EC 17573, CCR Title 5 14030]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
An additional related stipulation (Section 21) includes that any inspections conducted by the Los
Angeles County Health Department should be shared with the school site committee.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The cafeterias at the three high schools and at middle schools Roosevelt and Whaley
were remodeled for the 2002-03 school year to make them more attractive and to increase
student lunch participation.
2. Shade structures to enhance the outdoor lunch areas were erected at Roosevelt Elemen-
tary, Kelly Elementary, Foster Elementary and Roosevelt Middle School.
3. Colorfully painted trash barrels were placed in the lunch courtyards and additional out-
door benches have been provided for students.
4. Heating is provided to all cafeterias.
5. Attractive, new marquis messaging boards have been installed at the three high schools
and several other schools to announce upcoming school activities.
6. District modernization projects will provide several modernized school lunch rooms and
upgrade other areas of campus for students to enjoy their lunches.
7. The district has plans to modernize 12 kitchen food preparation areas.
8. Inspections of site cafeterias by the Los Angeles County Health Department are shared
with the school site administrators to share with the school site councils. Inspections oc-
cur only in response to a complaint.
• No inspections were conducted by the County Health Department during the
2001-02 school year.
• In 2002-03 the Health Department visited a site cafeteria in response to a parent
complaint and found that the complaint was unsubstantiated.
• A visit occurred at a school in summer 2003, and a report of that complaint was
shared with the site administration and site council.
• One inspection was conducted during the second semester of the 2003-04 school
year in response to a complaint. The complaint was found to be unsubstantiated.
• An inspection was conducted in January 2005 in response to a complaint of no hot
water at a site kitchen. The complaint was substantiated and hot water was imme-
diately restored with no loss of food preparation time. The complaint was shared
with the school principal.
• There were no complaints or inspections conducted in the remainder of the 2004-
05 year, and none in the first half of the 2005-06 school year.
Consent Decree
9. All district cafeteria managers and cooks participate in the Serve-Safe national certifica-
tion program, and three district food services employees are trainers in this certification
program.
10. Training in food safety and service is provided regularly for all employees.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 3
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 4
February 2001 Rating: 4
August 2001 Rating: 4
February 2002 Rating: 6
August 2002 Rating: 7
February 2003 Rating: 8
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 9
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 22. Central Telephone Number for Facilities Complaints
a. The State Administrator shall establish a central telephone number for the purpose of
receiving complaints about condition of school facilities.
b. The telephone number shall be distributed to all parents at the beginning of each
school semester and shall be posted in prominent places at all school sites.
c. All telephone calls shall be recorded on a form developed by the State Administrator.
The form shall require information that will ensure that the State Administrator can
prepare a quarterly report that provides information concerning the nature of the
calls received, the number of calls received, the school that each call concerned, and
the disposition of any complaints received. The quarterly report shall be provided to
counsel for plaintiffs and defendants and shall be available to the public.
FCMAT Facilities Management Standard 11.2 was the standard used to monitor the
district’s compliance with Section 22.
Consent Decree
Facilities Management Standard 11.2
Communication - Communication of Actions Taken, Planned, Progress Made
Professional Standard
The district should apprise students, staff and community of efforts to rectify any substandard
conditions.
Consent Decree Stipulations
Section 22 of the Consent Decree in the action Serna v Eastin, Case No. BC 174282, includes the
following stipulations: the district is to establish a central telephone number for complaints about
the condition of school facilities, distribute and post the telephone number for the public, develop
a form for recording calls, record all calls on the developed form, prepare quarterly reports con-
cerning the calls received at the school and district levels.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district provides ongoing communication about the district’s activities and positive
achievements to its community. The facilities department produces a quarterly newslet-
ter, utilizes the district web site, and participates in district conducted community forums
to keep the community informed of the district’s facilities projects.
2. The Facilities Division provides monthly project status reports to the governing board
and the district’s Bond Oversight Committee.
3. The governing board has established a facilities sub-committee of two board members
and district staff to monitor facilities conditions.
4. The district effectively communicated its facilities needs to its community and success-
fully passed an $80 million local general obligation bond in November 2002 with a com-
munity approval rate of more than 80%.
5. Complaints about facilities can be made through the district’s Emergency Hot-Line,
anonymously through the WE-TIP program, or at open Board meetings. The WE-TIP
hot-line program provides a means for community members to anonymously report fa-
cilities concerns or problems to the district.
6. Public complaints are also received through the district’s central telephone number, the
public information office, or the superintendent’s office. School complaints are generally
referred to the site principal for resolution. Complaints about security issues are made to
the Police Services department. Facilities complaints are made to school principals, the
facilities division, board members or the superintendent.
7. The district has also implemented the Williams settlement which provides parents a
complaint process if there is a concern about facilities conditions or the sufficiency of
instructional materials.
8. The district should receive regular reports from the WE-TIP program to analyze the type
of calls received.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 9
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 7
February 2001 Rating: 7
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 8
February 2003 Rating: 8
August 2003 Rating: 9
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
0 Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 23. Volunteerism
a. The District shall actively recruit parents to volunteer at school sites both during
hours that school is in session and other periods. The State Administrator shall
develop a parent involvement plan that includes strategies for recruiting and utilizing
parent volunteers to carry out the terms of this Consent Decree.
b. Volunteers shall be recruited to assist in security campus patrols, maintenance and
litter removal, and after-school tutoring programs. Plaintiffs’ counsel shall actively
assist in recruiting other parents to do volunteer work. Parents will be encouraged to
perform at least 40 hours of volunteer work per year at their child’s school.
c. The principal of each school, using a form developed by the State Administrator, shall
keep a record of the number of volunteer hours at each school site.
d. The State Administrator shall on a monthly basis present a certificate of appreciation
to the volunteer of the month from each school. The certificate shall be presented at a
public meeting, such as a meeting of the Advisory Board.
FCMAT Facilities Management Standard 10.1 was the standard used to monitor the
district’s compliance with Section 23.
Consent Decree
Facilities Management Standard 10.1
Community Use of Facilities - Plan to Promote Community Involvement in Schools
Professional Standard
The district should have a plan to promote community involvement in schools.
Consent Decree Stipulations
Section 23 of the Consent Decree in the action Serna v Eastin, Case No. BC 174282, includes
the following stipulations: the district is to develop a parent involvement plan, develop a form to
record volunteerism, recruit parents to volunteer 40 hours per year, keep records of the number
of volunteer hours at the schools, conduct monthly recognition programs and provide a certificate
to the volunteer of the month.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district continues to promote community involvement in its schools, and continues
to implement the “Volunteers in Public Schools” (VIPS) guide developed in the 1999-
2000 school year and updated in June 2005.
2. Schools continue to monitor volunteer participation and the number of parent volunteer
hours with sign-in sheets that are monitored by district administrative staff.
3. Training workshops continue to be provided to parents and school volunteers.
4. Each school has at least one or more parent coordinators to promote parent involvement
and assist parents in volunteer activities.
5. Community input is regularly sought by the district. The district holds parent/community
forums regularly to hear parents’ concerns and suggestions for improving district pro-
grams and operations. Four to five parent/community forums have been held each year
in 2002-03, 2003-04 and 2004-05. A community forum was conducted in fall 2005 and
four more are scheduled in 2006.
6. The district continues to provide training workshops to its classified personnel, particu-
larly front office staff, regarding providing a “customer service” attitude to parents and
school visitors.
7. All schools have a designated area for parents to meet. Parent centers are included in the
district’s Comprehensive Facilities Master Plan.
8. The district conducts an annual volunteer recognition dinner at the end of the school year
to show its appreciation for the many outstanding parent and community volunteers who
have worked with the schools. Individual sites also recognize parent volunteers. Ap-
proximately 350 volunteers and guests attended the district’s volunteer recognition din-
ner conducted in May 2005.
9. Parent involvement is a major component of several grant programs awarded to the dis-
trict, and parent committees are encouraged and supported.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 8
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 8
February 2001 Rating: 9
August 2001 Rating: 10
February 2002 Rating: 10
August 2002 Rating: 10
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 24. Race Relations
a. The State Administrator shall develop a program to incorporate race relations and
nonviolent conflict resolution into the ongoing course of study of all students. In
addition, the plan shall encourage the participation of parents in the course of study.
FCMAT Pupil Achievement Standard 1.10 was the standard used to monitor the district’s
compliance with Section 24.
Consent Decree
Pupil Achievement Standard 1.10
Variety of Instructional Strategies - Student Diversity
Professional Standard
Teachers use a variety of instructional strategies and resources that address their students’ diverse
needs.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 24) include the development of a program in race rela-
tions in an ongoing course of study for all students, and the encouragement of parent participa-
tion in the program.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district is including in the History/Social Science curriculum the study of the various
ethnic populations that are reflected in the student population.
2. The district purchased instructional materials on the Latino experience and the Afri-
can-American experience for use in the classroom. The district has added instructional
materials on the Asian, Pacific Islander, and Samoan experiences as well. Black History
Month and Spanish Heritage Month are acknowledged in the instructional program. The
birthdays of Martin Luther King, Jr. and Cesar Chavez are celebrated annually.
3. District desegregation funds have increased the availability of Spanish supplemental
materials in school libraries.
4. The district’s second annual Asian/Pacific Islander celebration was held at Longfellow
School in May 2004. A districtwide Cultural Diversity Celebration was held in April
2005 at Compton High. The next annual Cultural Diversity Celebration is scheduled for
April 2006 at Compton Community College.
5. The district has received one of only 17 Teaching American History grants awarded to
California districts. This is a collaborative professional development effort with the
California State Universities at Dominguez Hills and Long Beach to develop curriculum
and train teachers in the teaching of American History, including the contributions of its
various racial and ethnic groups. The grant is a Title II three-year grant for $996,000
provided by the Museum of Tolerance. The district plans to make district funds available
to continue the training.
6. District desegregation funds have increased the availability of Spanish supplemental
materials in the school libraries.
7. All of the high schools have a student Human Relations Club. Programs for students in
Conflict Resolution and Peer Mediation are implemented in the schools. Other student
programs such as Positive Action for the fourth grade level, Character Education, and
Wise Skills for the middle schools are encouraged. Eight elementary schools are imple-
menting the Wise Skills program. Many schools have an Advisory period available to
work directly on student issues.
Consent Decree
8. The National Conference for Community and Justice (NCCJ) sponsored human rela-
tions camps for students in December 2004 and April 2005. 90 students participated in
the district’s Student Leadership Conference on January 28, 2005. Compton’s leader-
ship students also participated with other student leaders in the area in a one-day training
conference supported by NCCJ in April 2005. The next NCCJ conference is scheduled
for March 2006.
9. 125 K-12 students participated in the district’s Student Leadership Summit in February
2005. 150 students in grades 4-12 from Cluster B participated in a leadership conference
on a college campus.
10. Staff development for teachers focuses on the differentiation of instruction to meet the
instructional needs of all students. All staff development activities use student data as
the basis for determining teacher training needs. Recent staff development emphasis
has been on how to increase the achievement of students of color. Specific instructional
programs have been designed for the targeted groups of students.
11. The district, with nine other consortium members, has received a $300,000 Cal-Soap
grant for underrepresented students to attend college. Student interns from CSU-Long
Beach assist district students with their college applications. The Achieving College
Partnership, in collaboration with CSU-Dominguez Hills and UC-Irvine, encourages
family members from underrepresented groups to be the first members of their family to
attend college.
12. The district’s instructional staff has been expanded. A Director of Curriculum and
Instruction has been hired, and four resource teachers for the areas of English, Writing,
English Learners, and Social Studies. A content area coach has been provided for the
three remaining schools under the School Assistance and Intervention Team (SAIT) pro-
gram.
Standard Implemented: Fully Implemented - Substantially
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: 3
August 2000 Rating: 4
February 2001 Rating: 4
August 2001 Rating: 5
February 2002 Rating: 6
August 2002 Rating: 7
February 2003 Rating: 7
August 2003 Rating: 8
February 2004 Rating: 8
August 2004 Rating: 9
February 2005 Rating: 9
August 2005 Rating: 9
February 2006 Rating: 9
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 25. Additional Compliance Requirements
a. Facilities Plan. A comprehensive facilities plan is currently being developed by
CUSD. Upon completion of that plan, defendants shall submit to the Fiscal Crisis
and Management Assistance Team (“FCMAT”) an implementation plan to implement
all recommendations of the facilities plan including specific timelines. FCMAT shall
solicit comments from plaintiffs’ counsel on the proposed implementation plan prior to
its approval. FCMAT shall approve, with such modifications as it deems appropriate,
the plan within 60 days of its submission. The implementation plan shall provide that
all recommendations of the facilities plan are implemented at the earliest feasible
date, and as part of the approval process, FCMAT shall issue detailed findings setting
forth the reason each timeline was chosen. Defendants shall make a good faith effort
to implement such implementation plan.
c. During the period of this Consent Decree, the proceeds of any local CUSD bonds
or other local CUSD borrowing instruments shall be used solely to implement the
facilities plan required by Section 25(a) until such plan is fully implemented or for
such other capital expenditures determined by FCMAT to be necessary or appropriate
to implement the FCMAT recovery plans until such plans are fully implemented.
FCMAT Facilities Management Standards 2.1 and 3.10 were the standards used to monitor
the district’s compliance with Section 25a and 25c.
Consent Decree
Facilities Management Standard 2.1
Facility Planning - Maintenance of a Long-Range Facilities Master Plan
Professional Standard
Compton Unified School District should have a long-range school facilities master plan.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 25) include developing a comprehensive facilities plan
with time lines, submitting the plan to FCMAT for approval, and FCMAT soliciting comments
from plaintiffs’ counsel.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The board adopted a long-range Comprehensive Facilities Master Plan on July 13, 1999.
The district completed a Facilities Implementation Plan which was approved by FCMAT
effective August 10, 2001. The implementation plan provides a time line and priority for
modernization and new construction projects.
2. All district facilities projects since that time have been based on the long-range Facilities
Master Plan. Decisions about the use of the district’s deferred maintenance funds have
also been guided by the plan.
3. Twenty-eight modernization and several new construction projects (6 classroom addi-
tions and 2 elementary schools) were approved by the Division of the State Architect
(DSA) and the Office of Public School Construction (OPSC) several years ago and have
awaited the availability of state and district funds.
4. The state’s General Obligation Bond (GOB), Proposition 47, was passed in November
2002.
5. The district’s local $80 million General Obligation Bond, Measure I, was passed in No-
vember 2002.
6. The district established a bond oversight committee of 12 community members and
a representative of FCMAT to ensure that the bond proceeds are utilized as the voters
intended. The committee meets on the first Monday of each month to review district
reports on project updates.
7. The district approved a Certificate of Participation (COP) for $16 million to build the
William Jefferson Clinton Elementary School, which opened to students in January 2003
to accommodate 850 students. Funds for construction of Clinton Elementary School
were included in the GOB which will be used to retire the COP. Additional classrooms
are planned to expand Clinton Elementary to accommodate the additional students that
will be attending the school.
8. Additional classroom buildings with science/technology labs are planned for Dominguez,
Compton and Centennial High Schools.
0 Consent Decree
9. The district has initiated work on the second of the three new schools identified in the
Facilities Master Plan. The district offices at South Tamarind Avenue will be demolished
for the second new elementary school, Liberty Elementary, to be built there. District
office staff and administrators are currently housed in temporary bungalows at 500 South
Santa Fe Avenue. The district board has approved a $10 million Certificate of Participa-
tion (COP) to build permanent facilities for district office operations to be located on
South Santa Fe Avenue.
10. Completion of the majority of the district’s current modernization projects is expected by
summer 2006.
11. The district is currently seeking additional funding for future facilities projects. The dis-
trict carefully monitors its student enrollment growth for eligibility in increased facilities
funding.
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: 5
February 2000 Rating: 6
August 2000 Rating: 7
February 2001 Rating: 8
August 2001 Rating: 9
February 2002 Rating: 10
August 2002 Rating: 10
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Facilities Management Standard 3.10
Facilities Improvement and Modernization - Plan for Maintenance and
Modernization Exists
Legal Standard
The CUSD maintains a plan for the maintenance and modernization of its facilities. [EC 17366]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Additional related stipulations (Section 25) include developing a comprehensive facilities imple-
mentation plan with time lines, submitting the plan to FCMAT for approval, and FCMAT solicit-
ing comments from plaintiffs’ counsel.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulations have been met.
1. The district developed a Comprehensive Facilities Master Plan, adopted by the Board in
July 1999.
2. The district completed a Facilities Implementation Plan, approved by FCMAT effective
August 10, 2001, to implement the district’s Comprehensive Facilities Master Plan. The
plan identifies sources of district general funds and provides a priority for the completion
of construction projects.
3. All district facilities projects since 1999 have been based on the long-range Facilities
Master Plan. Decisions about the use of the district’s deferred maintenance funds were
also guided by the plan.
4. The state’s General Obligation Bond, Proposition 47, was passed in November 2002,
and the district’s local $80 million General Obligation Bond, Measure I, was passed in
November 2002. The district established a bond oversight committee to ensure that the
bond proceeds from the district’s $80 million local general obligation bond are utilized as
the voters intended.
5. The district has initiated work on the second of the three new schools identified in the
Facilities Master Plan. The district offices at South Tamarind Avenue will be demolished
for the new Liberty Elementary School to be built there. District office staff and admin-
istrators are currently being housed in temporary bungalows on South Santa Fe Avenue.
The district board has approved a $10 million Certificate of Participation (COP) to build
permanent facilities for district office operations to be located on South Santa Fe Avenue.
6. The district is currently seeking additional funding for future facilities projects.
7. Completion of the majority of the district’s current modernization projects is expected by
summer 2006.
Consent Decree
Standard Implemented: Fully Implemented - Sustained
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Consent Decree
Consent Decree
CONSENT DECREE
III. School Conditions and Instructional Materials
Section 25. Additional Compliance Requirements
b. FCMAT has prepared five recovery plans for CUSD: Pupil Achievement; Financial
Management; Facilities Management; Personnel Management; and Community
Relations. In each of these five plans, FCMAT has identified specific legal and
Professional Standards by which to assess CUSD’s compliance. In connection with
each standard, FCMAT has measured CUSD’s progress using a 10-point scale, with
a scaled score of “0” representing a standard that is not implemented and a scaled
score of “10” representing a standard that is fully implemented. The standards of the
Pupil Achievement recovery plan and Facilities recovery plan are made a part of this
Consent Decree and shall be subject to the compliance requirements of this Consent
Decree.
(i) A list of standards for the Pupil Achievement recovery plan and Facilities
recovery plan, including the current scaled scores is set forth in Exhibit “A”
attached hereto and incorporated by reference. Any standard that has a scaled
score of 8, 9, or 10 shall be deemed to have been implemented. Any standard
that has a scaled score of less than 8 shall be addressed and improved by
defendants. Compliance with a recovery plan’s standards shall be deemed
satisfied when FCMAT certifies that defendants have achieved an average
scaled score for all such standards of 7.5 and no standard has received a
scaled score of less than 4. In addition, compliance shall not be deemed
achieved unless the following standards have received a score of at least 8:
1) Pupil Achievement: 1.2; 1.4; 1.5; 1.10; 1.11; 1.16; 1.20; 1.21; 1.23;
1.25; 2.3; 2.6; 2.9; 2.10
2) Facilities: 1.3; 1.6; 1.7; 1.8; 1.9; 1.12; 1.14; 1.17; 2.1; 2.3; 2.4; 2.5;
2.6; 3.4; 3.8; 3.10; 6.2; 6.3; 8.5; 8.6; 8.8; 8.9; 8.10; 8.12; 9.3; 9.4; 9.7;
9.8; 9.10; 9.11.
(ii) Within 60 days of the approval of this Consent Decree, defendants shall
submit to FCMAT a proposed time line to implement the Pupil Achievement
recovery plan and Facilities recovery plan. FCMAT shall solicit comments
from plaintiffs’ counsel on the proposed time lines prior to its approval.
FCMAT shall approve, with such modifications as it deems appropriate, the
time lines within 60 days of its submission. The time lines shall provide that
all recommendations of these recovery plans are implemented at the earliest
feasible date, and FCMAT shall issue detailed findings setting forth the reason
each time line was chosen.
(iii) In the event that defendants are unable to comply with any time line,
defendants may apply to the Special Master for an extension of time upon
a showing of good cause. Absent an extension, plaintiffs may apply to the
Special Master for specific orders directing particular actions to bring CUSD
into compliance.
Consent Decree
The FCMAT standards that were identified in the Consent Decree Section 25.b.i as needing
to reach a rating of 8 to be deemed compliant follow on the next pages of this report. All of
the identified standards in Pupil Achievement and Facilities Management have reached a
rating of 8 or better as required.
Charts of the Pupil Achievement and Facilities Management standards are included in this report
to provide an overview of the ratings of the standards over time and the status of their implemen-
tation.
Consent Decree
Pupil Achievement Standards
The following standards were identified by the parties in the Consent Decree as needing to reach
a rating of 8 to be deemed compliant. If not already presented in response to a Section of the
Consent Decree, these standards appear in the following pages. A chart of the Pupil Achievement
standards is included to provide an overview of the ratings of the standards over time and the
status of their implementation.
1.2 See Consent Decree Section 13
1.4
1.5 See Consent Decree Section 19
1.10 See Consent Decree Section 24
1.11 See Consent Decree Section 13
1.16 See Consent Decree Section 19
1.20
1.21
1.23
1.25 See Consent Decree Section 8
2.3
2.6
2.9
2.10
Pupil Achievement
1.4 Multiple Assessment Tools - Program Adjustment
Professional Standard
The district has adopted multiple assessment tools, including diagnostic assessments, to evaluate,
improve, or adjust programs and resources.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district utilizes multiple diagnostic assessments to measure students’ academic
performance. An Assessment Plan has been developed, presented, and disseminated to
all principals and site testing coordinators. All schools submit a site testing plan for
administering the STAR and CAHSEE tests.
2. Schools receive timely assessment results for all district and state assessments for
use in developing their individual school plan for student achievement. Extensive
data is available to site staffs in a user-friendly format. Test results are disaggregated,
summarized and presented to the Executive Cabinet, principals and teachers. Teachers
receive performance data for each class of students indicating the standards mastered by
students.
3. Presentations on the district’s testing program and levels of student performance have
been made annually to teachers, the governing board and the community. Schools can
download test reports or power point programs for parent presentations on the various
tests and test terminology (AYP, API, CST) and how to interpret test scores. The district
has made available the web-based Data Driven Classroom program that allows teachers
to access student performance data from any school site or from home.
4. The district has successfully implemented the new Eagle attendance and student
information system. Each student’s assessment history is now stored in the new system.
Teachers are able to access test scores for any student on their class roster and can order
their own reports.
5. The district has developed a video in English and Spanish on the California High
School Exit Exam (CAHSEE) and has publicized the importance of the CAHSEE on the
district’s public information station Channel 26 to inform parents of the high school exit
exam requirement beginning with the graduating class of 2006.
6. The CAHSEE is administered in the spring (February and May) to current 10th graders.
All three high schools met the 95% participation rate in spring 2004 and 2005. Seniors
have an extra test administration opportunity in March.
7. The district has a remediation plan for students who have not passed one or both portions
of the CAHSEE exams. Middle school and high school administrators and teachers
participate in CAHSEE trainings provided by UC Irvine, Kaplan, the College Board, and
the LACOE Principals’ Exchange. As of February 2006, approximately 515 seniors had
not yet met the CAHSEE requirement for graduation in June. Many of these students
are special education students who will be exempted, by special legislation, from this
requirement for 2006 only.
Pupil Achievement
8. High school graduation requirements have been increased for the graduating class of
2006 and beyond. New requirements include two years of foreign language (20 credits),
one year of visual and performing arts (10 credits), 2.5 credits in community service
(45 clock hours) and 2.5 credits in a senior research project. Graduation requirements
are posted on the district website and on graduation requirement posters displayed in
classrooms throughout the high schools.
9. The district has developed benchmark assessments for English Language Development
(K-12), English Language Arts (K-12), Mathematics (K-12), and Science (K-5).
Benchmarks for History/Social Science are in progress.
10. Assessments are also imbedded in adopted curriculum materials such as Open Court,
Holt, Language! and Saxon Math, providing teachers with immediate feedback on
students’ performance. Quarterly benchmarks have been developed in ELD, mathematics
and writing.
11. District writing assessments continue to be administered four times a year. Teachers
score writing assessments using a 6-point rubric that is aligned with the state standards
and CAHSEE. The Vantage Writing Assessment program is available to seventh graders
online.
12. The district is working to improve the schools that have not made Adequate Yearly
Progress (AYP) for several years, identified as Program Improvement (PI) schools.
Fifteen district schools were PI schools in 2003-04, seven in year 1 and eight in year
3. In 2004-05, 23 schools were PI schools, eleven in year 1, four schools in year 2, and
eight schools in year 4 which is the planning year for restructuring the school. Three
district schools also require School Assistance and Intervention Teams (SAIT) for school
improvement. Two schools have been identified as state monitored schools under the
High Priority Schools program.
13. In the 2003-04 school year, Centennial High School received a three-year interim
accreditation with a visit scheduled in spring 2007. Centennial HS also exited the School
Assistance and Intervention Team (SAIT) program.
14. Compton High School and Dominguez High School were visited by the Western
Association of Schools and Colleges (WASC) accreditation teams in fall 2004. Both
schools received notification of their accreditation status in spring 2005.
• Compton High received an accreditation of one year through 2005-06, with a one-
day visit to be conducted in 2006 and an extension until the full review team visits
in fall 2006.
• Dominguez High received an accreditation of two years through 2006-07.
15. All three of the district high schools must seriously address the urgency of maintaining
their accreditation status. Each of the three high schools will be visited by a full
accreditation team in fall 2006 or spring 2007 and will be awarded new terms of
accreditation to begin fall 2007.
Pupil Achievement
Standard Implemented: Fully - Substantially
February 1999 Rating: 0
August 1999 Rating: 2
February 2000 Rating: 4
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 6
August 2002 Rating: 7
February 2003 Rating: 8
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 9
February 2006 Rating: 9
Implementation Scale:
Pupil Achievement
1.20 Administrative Support and Coaching - Teachers
Professional Standard
Administrative support and coaching are provided to all teachers.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. Coaching of teachers is provided by site administrators, the Los Angeles County Office of
Education, UC subject matter consultants, and outside consultants. Principals have been
trained in coaching strategies.
2. In collaboration with nearby colleges and universities, the district continues to apply for
and receive professional development grants to enhance teachers’ teaching skills.
3. All new instructional programs implemented include coaching of teachers as a major
strategy to be provided by all service providers. Coaching and classroom support is
expected to be consistent and frequent.
4. The certificated evaluation form has been revised to include the California Standards for
the Teaching Profession as desired teaching outcomes. Principals are required to be in
the classrooms or engaged in instructional activities for a minimum of 20% of the day to
address instructional improvement.
5. Principals are evaluated by the cluster associate superintendents with final evaluation
approval made by the Superintendent. The principal’s evaluation process includes
evaluation of curriculum oversight and time in the classroom.
6. The district is focused on improving student academic performance and has developed
an internal instructional audit process, detailed in an Instructional Audit Handbook, to
monitor effective program implementation at the schools. Visiting teams of four or more
administrators visit each of 12 sites for one day during the first quarter, with two to three
visitations occurring in the next three quarters. In the 2004-05 year, visits to the first
12 sites were conducted in November 2004. Second and third visits were conducted in
February and May 2005. Visits for 2005-06 have been scheduled for December 2005,
January, February and March 2006.
7. Cluster associate superintendents meet with site administrators regularly and visit schools
frequently. Cabinet members visit sites every Wednesday. School Site Visitation Reports
document these weekly site visits.
8. School schedules were modified to include “banked time” to establish minimum days
for staff development. Minimum days are currently scheduled on Wednesdays, instead
of Mondays, and provide a block period of time for staff development and instructional
support.
9. The Office of Research, Evaluation, and Assessment continues to assist the district and
school sites by providing relevant and timely student assessment information to assist in
staff development. Sites can conduct a student performance assessment every two weeks
by using a district item bank to create appropriate exam questions to determine student
mastery of instructional content.
Pupil Achievement
10. The district has established a two-year Aspiring Administrators Academy to train district
teachers for future administrative positions. Two training sessions are provided each year
to help these aspiring administrators to appropriately use and interpret test data.
11. The district conducts an annual Parent Survey to solicit parent input on various district
operations. Approximately 4,000-5,000 responses are received from parents each year.
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: 3
February 2000 Rating: 4
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 7
February 2003 Rating: 8
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Pupil Achievement
1.21 Professional Development - Personnel Evaluation
Professional Standard
Professional development is linked to personnel evaluation.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The certificated evaluation form was revised to align with the California Standards for the
Teaching Profession. Principals have been trained to use the revised evaluation form and
to base classroom observations on these standards.
2. The district has implemented the Eagle student information system which can interface
with the Human Resources HRTS personnel system. The district is able to monitor
teacher credential requirements, the 150 hours of professional development required for
credential renewal, progress toward meeting the competency requirements of the No
Child Left Behind Act, and participation in AB 466 and AB 75 training activities.
3. The district’s Peer Assistance and Review Program (PAR) provides a plan of assistance
to teachers who are performing at a less than satisfactory level. The Beginning Teacher
Support and Assistance (BTSA) program provides coaching support to probationary
teachers.
4. Principals are expected to spend a minimum of 20% of their day in the classroom or
in related instructional activities. Principals’ evaluations include their effectiveness in
supervising faculty and staff, and monitoring curriculum, which includes significant
documentation.
5. The cluster associate superintendents receive information about the instructional
programs at the sites through the instructional audit team review process. They discuss
the strengths and weaknesses of the instructional programs observed, and work with the
site principals to identify the steps to take to improve the delivery of instruction in the
classrooms.
6. Numerous staff development workshops are provided to improve the skills and
performance of the instructional staff. Teachers needing assistance can receive
appropriate staff development training.
7. Executive cabinet members visit school sites every Wednesday. A School Site Visitation
Report form has been developed to document these visits and any findings, comments or
concerns.
8. All principals participate in required training through the Compton Leadership
Development Institute, which covers twelve topics of effective leadership in school
operations. Principals are also required to have, or obtain within two years, English
Learner authorization (CLAD or BCLAD). 51% of all certificated district employees
including management have this authorization.
Pupil Achievement
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: 3
February 2000 Rating: 4
August 2000 Rating: 5
February 2001 Rating: 5
August 2001 Rating: 5
February 2002 Rating: 7
August 2002 Rating: 7
February 2003 Rating: 8
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Pupil Achievement
1.23 Initial Student Placement - Procedures
Professional Standard
Initial placement procedures are in place to ensure the timely and appropriate placement of all
students with particular emphasis being placed on students with special needs.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
Special Education:
1. A Student Orientation Center was established on September 3, 2002 at 417 West
Alondra Avenue to receive all students new to the district for enrollment, assessment
and appropriate placement. Initial Student Placement Procedures and a Tracking Form
have been developed. Training has been provided to site administrators on the process
and procedures of initial placement. The Center provides support services for Special
Education; English Language Learners; Child Welfare and Attendance; Health, Human
and Homeless Services; and some Alternative Education services such as a district
suspension classroom. Students are placed at a school generally within 24 hours of
enrolling.
2. The comprehensive student registration form, in English and Spanish, was revised in
spring 2005. It solicits pertinent information on incoming students for appropriate
placement of students. The student intake process is well-established and efficient.
3. Identified special education students and students with 504 accommodations plans receive
immediate services by center staff. Students suspected of needing special education or
special accommodations are immediately referred to appropriate staff for assessment.
4. Site administrators continue to assist the student placement process by making sure that
master schedules in the middle and high schools provide appropriate course offerings for
English learners and special needs students.
5. District Special Education administrators are located at the Student and Staff Support
Center on Alondra Street. A new director for Special Education was hired in fall 2005.
The school psychologists have work stations at the Alondra Street site and are assigned to
a specific cluster of schools to provide services to the students in their cluster.
6. The Special Education Handbook of Policies and Procedures provides compliance
protocols and procedures for monitoring of special education services. The protocols
summarize the administrative responsibilities of site administrators in the SST, IEP, and
504 processes. The Handbook will be updated by summer 2006 to reflect changes in the
federal IDEA. The district has been working with the Office for Civil Rights (OCR) in
December 2005 and January 2006 on the updates. A Leadership Team composed of 3
Pupil Achievement
psychologists, 2 program coordinators and the senior directors meet weekly to update
the policies and procedures manual. When completed, training will be provided for site
administrators, teachers and staff on the changes in the protocols within the department
and the changes that reflect the revisions in the federal IDEA. A quick reference guide of
commonly asked questions about special education will also be developed for easy use.
7. The district has developed a Voluntary Resolution Plan in response to OCR concerns
to ensure that it has sufficient numbers of appropriate staff to identify and address the
special education and linguistic needs of English language learners. OCR continues to
monitor the district’s progress.
8. As of December 1, 2005, approximately 1748 students or 5.78% of the 2005-06 student
population were identified as special education students: 660 in the Resource Specialist
Program, 971 in Special Day Classes and 114 in other placements (TMR). The district
is monitoring its referral process to assess whether African-American students may be
over-identified and Hispanic students under-identified. An examination of current student
numbers indicates that 53% of special education students are African-American and 46%
are Hispanic; 67% of current special education students are males. The 2004-05 CBEDS
ethnicity data indicate that the district has 26.9% African-American students and 71%
Hispanic students in the general student population.
9. The district’s plan of corrective actions in Special Education was accepted by the State
Department of Education.
10. Intervention programs include after school tutorials, additional class periods or an
extension of the student’s day, and mandatory summer school attendance.
11. A workability program resource center has been established at Tibby Elementary School.
Training for Transitions is provided by the Workability I coordinator to teachers of
special education students 16 years of age or older. Students are being identified as early
as age 14 for Transition support and training. 676 students are currently participating in
the Workability I program.
12. The district’s implementation of the Eagle student information system enables the district
to monitor the status of student IEPs, Triennials, 504s, and Student Suspensions. The
district is able to monitor, by site, any overdue triennial or IEP to take timely action.
Weekly reports are provided to the cluster associate superintendents for follow-up. A
new data base was created in the student information system to track pre-school and
kindergarten special needs students.
13. The district has established a Special Needs Advisory Committee that meets every month
on special needs issues. The district also has established a support group for parents of
autistic students.
14. The district has implemented a new technology data system that allows special education
data to be transferred electronically to the county office.
15. A Section 504 manual has been developed and is under review by OCR. Training on 504
has been conducted at all school sites.
16. Monthly professional development workshops are being provided for special education
teachers at all grade levels. These meetings are held on the Wednesday minimum days
and are provided in conjunction with the BTSA training program.
0 Pupil Achievement
English Language Learners:
1. The Master Plan for English Learners is being implemented. The Master Plan was
adopted by the governing board on December 10, 2002, and was approved by the state
department.
2. Board Policy No. 6174 Education for English Language Learners was revised.
3. Appropriate assessments of new students are conducted based on the Home Language
Survey.
4. The district reports that student demographics in the district are changing, and students
are highly transitory. For example, in the period from September 2004 to January 2005,
the district enrolled 4,125 new elementary students, 871 new middle school students and
789 new high school students. 54% of the elementary students were English Learners
(EL), 31% of the middle school students were EL and 18% of the high school students
were EL. 84 of the elementary students needed special education services, as well as 80
of the middle school students and 57 of the high school students. 52 students enrolled
during this period were both English Learners and needed special education services.
5. The district has been visited by the Comité each year since 2002-03 and has worked
strenuously to address the many areas of non-compliance in the English language
learner program cited by the Comité. The district has addressed most of the areas of
non-compliance. Appropriations withheld by the state department for previous non-
compliance issues in 2001-02 were released to the district ($2.2 million). The district
received all funds for 2003-04 with the expectation that the district would continue to
improve its services to students. The $3.2 million that was withheld from 2002-03 was
released by the state in 2004-05. All funds previously withheld for non-compliance
issues have thus been released to the district.
6. The district has been informed that the Office for Civil Rights soon will formally close its
monitoring of the district’s English Learner program.
7. HRED monitors the credentials of staff who work with English learners to ensure that
qualified teachers have been assigned to deliver ELD and core curriculum to English
learners. Current teacher preparation programs include CLAD certification. The district
expects site principals to have or acquire CLAD or BCLAD certification within three
years.
8. The district developed English Learner (EL) district benchmarks, and EL checklists for
both elementary and secondary principals to monitor the EL programs at their sites.
9. The district has developed new program descriptions for program placement. Course
descriptions have been written for Specially Designed Academic Instruction in English
(SDAIE) for all courses required for graduation. English language development (ELD)
course descriptions have been written for ELD classes.
10. The district provides Structured English Immersion classes at all sites, and dual Spanish
immersion programs at Emerson, Tibby, Bunche, and Roosevelt Elementary Schools,
and at Roosevelt Middle School. Newcomer classes are offered at Jefferson and Kennedy
Elementary Schools and Davis Middle School.
11. An ELD Curriculum Guide has been developed and disseminated to teachers. High
Point is used in grades 4-12 and Avenues is used in grades K-5 as the textbooks in ELD
classrooms. Additional support materials have been purchased for all levels.
12. An EL Resource Teacher was hired for the 2005-06 school year to assist in monitoring
the EL program and providing staff development to the school sites.
Pupil Achievement
Standard Implemented: Fully - Substantially
February 1999 Rating: 0
August 1999 Rating: 1
February 2000 Rating: 3
August 2000 Rating: 4
February 2001 Rating: 4
August 2001 Rating: 4
February 2002 Rating: 6
August 2002 Rating: 6
February 2003 Rating: 7
August 2003 Rating: 7
February 2004 Rating: 8
August 2004 Rating: 8
February 2005 Rating: 8
August 2005 Rating: 9
February 2006 Rating: 9
Implementation Scale:
Pupil Achievement
2.3 Class Time - Protected for Student Learning
Legal Standard
Class time is protected for student learning. (EC 32212)
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The protection of class time for instruction and student learning continues to be a
required element in each school’s improvement plan. Strategies are developed by teachers
at each site, made part of the school improvement plan, and posted in each classroom.
Strategies include ways to reduce classroom interruptions and public announcements.
2. The district has a board policy that addresses student learning time that is sent to the
schools each year.
3. Instructional time for students continues to be extended beyond the regular instructional
day and year with opportunities for Saturday school, after school tutorial programs, and
summer extended year programs.
4. The Superintendent has placed a moratorium on field trips during the instructional day
between February and May of the STAR testing period.
5. The Superintendent has set a goal for principals to improve their school student and staff
attendance, targeting a 96% attendance rate for elementary students, a 95% attendance
rate for middle school students, and a 95% attendance rate for high school students. The
goal for teacher attendance is 97%. Weekly teacher attendance reports are provided to
the cabinet and site principals.
6. The district monitors student attendance regularly, particularly as future student
enrollment is expected to decrease slightly, and the general fund revenue limit is tied to
students’ average daily attendance.
7. The district is involved with other districts in multi-agency truancy sweeps. A district
truancy center is scheduled to open in February 2006.
Pupil Achievement
Standard Implemented: Fully - Sustained
February 1999 Rating: 6
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 7
February 2001 Rating: 8
August 2001 Rating: 8
February 2002 Rating: 9
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Pupil Achievement
2.6 General Instructional Programs
Legal Standard
The general instructional program adheres to all requirements put forth in EC 51000-52950.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district complies with the mandates of the Education Code 51000 through 52950.
The district updated board policies in 2000 and has established procedures for reviewing
board policies on a regular basis.
2. The district is implementing a standards-based curriculum. Curriculum guides reflecting
the state standards and identifying benchmarks are available for all grade levels.
Curriculum guides have been further revised to make them user-friendly.
3. All textbooks are aligned with the California Content Standards. Adoption of textbooks
follows the state adoption cycle and is conducted at the district level to ensure comparability
of instruction across the district. The Williams settlement protocols are being implemented
and all students are provided a textbook for each of the core courses.
4. The district completed the Master Plan for English Learners in December 2002. The plan
was approved by the district board and the state department.
5. The district has revised its educational plan to meet Performance Improvement (PI)
District compliance requirements.
6. The district is focused on improving student academic performance and has developed
an internal instructional audit process, detailed in an Instructional Audit Handbook, to
monitor the effective implementation of instructional programs at the schools.
7. Graduation requirements for the graduating class of 2006 include passage of the
CAHSEE exit exam. Graduation requirements are posted on the district website and in
high school classrooms. Remedial intervention strategies are provided to assist students
in passing the CAHSEE exam.
Pupil Achievement
Standard Implemented: Fully - Sustained
February 1999 Rating: 5
August 1999 Rating: 6
February 2000 Rating: 6
August 2000 Rating: 7
February 2001 Rating: 7
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 9
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Pupil Achievement
2.9 Accountability - Maximum Educational Opportunity
Legal Standard
The district shall be accountable for student results by using evaluative information regarding the
various levels of proficiency and allocating educational resources to assure the maximum educa-
tional opportunity for all students. (EC 60609)
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district utilizes multiple diagnostic assessments to measure students’ academic
performance. An Assessment Plan has been developed, presented, and disseminated to all
principals and site testing coordinators.
2. Each school receives timely test results to use in developing their school plan for
improving student achievement. Schools are provided 4-5 years of historical comparative
test data for all subgroups of students to monitor student progress over time and to plan
for instructional improvement.
3. The district successfully implemented the Eagle attendance and student information
system. Each student’s assessment history is stored in the new system and teachers are
able to access test scores for any student on their class roster and can order their own
reports.
4. Test information and test data are accessible online. Schools can download test reports
or power point programs for parent presentations on the various tests and how to interpret
test scores.
5. The district has developed a video in English and Spanish on the California High
School Exit Exam (CAHSEE) and has publicized the importance of the CAHSEE on the
district’s public information station Channel 26 to inform parents of the high school exit
exam requirement beginning with the graduating class of 2006.
6. The district provides instructional materials funds to the sites on an equitable per-pupil
basis. Categorical funds are utilized to support instructional programs for children with
special educational needs, e.g., English language learners and special education.
Pupil Achievement
Standard Implemented: Fully - Sustained
February 1999 Rating: 2
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 7
February 2003 Rating: 8
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Pupil Achievement
2.10 Measurement of Student Achievement
Legal Standard
Student achievement will be measured using standardized achievement tests and a variety of
measurement tools, i.e., portfolios, projects, oral reports, etc. (EC 60602, 60605)
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. This standard also is discussed in Standards 1.4 and 2.9.
2. The district utilizes multiple diagnostic assessments to measure students’ academic
performance. An Assessment Plan has been developed, presented, and disseminated to
all principals and site testing coordinators. All schools submit a site testing plan for
administering the STAR and CAHSEE tests.
3. Schools receive timely assessment results for all district and state assessments for
use in developing their individual school plan for student achievement. Extensive
data is available to site staffs in a user-friendly format. Test results are disaggregated,
summarized and presented to the Executive Cabinet, principals and teachers. Teachers
receive performance data for each class of students indicating the standards mastered by
students.
4. Test results are available in a variety of formats for school use. Principals meet with
their staffs at the beginning of the school year to review test scores and identify areas of
instructional focus for the year.
5. The district implemented the Eagle attendance and student information system. Each
student’s assessment history is stored in the new system and teachers are able to access
test scores for any student on their class roster and can order their own reports.
6. Test information and test data are accessible online. Schools can download test reports
or power point programs for parent presentations on the various tests and how to interpret
test scores.
7. The district has developed a video in English and Spanish on the California High
School Exit Exam (CAHSEE) and has publicized the importance of the CAHSEE on the
district’s public information station Channel 26 to inform parents of the high school exit
exam requirement beginning with the graduating class of 2006.
8. Training workshops on the district’s assessment tools continue to be provided to
administrators and teachers.
Pupil Achievement
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 8
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
0 Pupil Achievement
Chart of
Pupil Achievement Standards
Progress Ratings Toward Implementation of the Serna v Eastin
Consent Decree
Pupil Achievement
Pupil Achievement
Pupil
Achievement
23
Pupil Achievement
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
NR
not
reviewed
The district through its ad-
opted policy provides a clear
1.1 operational framework for 0 3 5 7 8 NR NR 9 NR NR NR NR NR NR NR Implemented
management of the curricu-
lum.
The district has clear and
valid objectives for students,
1.2* 0 2 3 5 6 6 7 8 8 9 10 10 10 10 10 Implemented
including the core curriculum
content.
The district directs its re-
1.3 sources fairly and consistently 0 2 4 5 6 NR NR 7 NR NR NR NR NR NR NR June 2002
to accomplish its objectives.
The district has adopted mul-
tiple assessment tools, includ-
1.4* ing diagnostic assessments, to 0 2 4 6 6 6 6 7 8 8 9 9 10 9 9 Implemented
evaluate, improve, or adjust
programs and resources.
Expectations and a practice
exist to improve the prepara-
1.5* tion of students and to build 0 3 NR 5 5 5 6 6 7 8 9 9 9 9 10 Implemented
school structure with the
capacity to serve all students.
The assessment tools are clear
measures of what is being
1.6 0 NR NR 4 6 NR NR 7 NR NR NR NR NR NR NR June 2002
taught and provide clear di-
rection for improvement.
Staff development provides
staff with the knowledge and
1.7 3 4 5 6 7 NR NR 7 NR NR NR NR NR NR NR June 2002 the skills to improve instruc-
tion and the curriculum.
Staff development demon-
strates a clear understanding
1.8 3 5 6 7 7 NR NR 7 NR NR NR NR NR NR NR June 2002
of purpose, written goals, and
appropriate evaluations.
Evaluations provide construc-
1.9 tive feedback for improving 0 3 4 5 5 NR NR 6 NR NR NR NR NR NR NR June 2002
job performance.
Teachers use a variety of
instructional strategies and
1.10* 0 NR 3 4 4 5 6 7 7 8 8 9 9 9 9 Implemented
resources that address their
students’ diverse needs.
Students are engaged in
learning and they are able to
1.11* 0 NR 3 4 5 5 6 7 7 8 8 9 9 10 10 Implemented
demonstrate and apply their
knowledge and skills.
The standards developed by
the California Standards for
1.12 0 NR 3 5 5 5 NR 8 NR NR NR NR NR NR NR Implemented
the Teaching Profession are
present and supported.
Teachers modify and adjust
1.13 instructional plans according 0 NR 3 4 4 5 NR 6 NR NR NR NR NR NR NR June 2003
to student needs and success.
Challenging learning goals
and instructional plans and
1.14 0 NR 3 4 5 5 NR 6 NR NR NR NR NR NR NR June 2003
programs for all students are
evident.
The administration and staff
utilize assessment information
1.15 0 1 4 5 6 NR NR 7 NR NR NR NR NR NR NR June 2002
to improve learning opportu-
nities for all students.
24
Pupil
Achievement
Pupil Achievement
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
NR
not
reviewed
Pupil
Achievement
25
Pupil Achievement
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
NR
not
reviewed
A common vision of what all
students should know and be
1.16* 0 NR 4 5 6 6 6 6 7 8 9 9 9 9 10 Implemented
able to do exists and is put
into practice.
Goals and grade level perfor-
1.17 mance standards based on a 3 NR 4 5 5 5 NR 6 NR NR NR NR NR NR NR June 2001
common vision are present.
Every elementary school has
embraced the 1997 California
1.18 6 NR 6 7 8 NR NR 8 NR NR NR NR NR NR NR Implemented
School Recognition Program
Standards.
Efforts will be made by the
district to partnership with
1.19 state colleges and universities 8 NR 8 9 10 NR NR 10 NR NR NR NR NR NR NR Implemented
to provide appropriate courses
accessible to all teachers.
Administrative support and
1.20* coaching are provided to all 0 3 4 5 6 6 7 7 8 8 9 9 10 10 10 Implemented
teachers.
Professional development is
1.21* linked to personnel evalua- 0 3 4 5 5 5 7 7 8 8 9 9 10 10 10 Implemented
tion.
Collaboration exists between
higher education, district,
1.22 professional associations and 7 NR NR 8 9 NR NR 9 NR NR NR NR NR NR NR Implemented
community in providing pro-
fessional development.
Initial placement procedures
are in place to ensure the
timely and appropriate place-
1.23* ment of all students with 0 1 3 4 4 4 6 6 7 7 8 8 8 9 9 Implemented
particular emphases being
placed on students with spe-
cial needs.
Clearly defined discipline prac-
tices have been established
1.24 and communicated among 8 N R NR 8 9 NR NR 10 NR NR NR NR NR NR NR Implemented
the students, staff, board and
community.
The district will ensure that
1.25* all instructional materials are 4 NR NR 5 5 5 6 7 8 8 8 9 9 9 10 Implemented
available to all students.
The district has adopted a
1.26 plan for integrating technol- 0 4 5 6 7 NR NR 8 NR NR NR NR NR NR NR Implemented
ogy into the curriculum.
The district’s planning process
ensures focus and connec-
1.27 0 NR NR 4 5 5 NR 6 NR NR NR NR NR NR NR June 2002
tivity to increased student
productivity.
Human Resources practices
1.28 support the delivery of sound 0 NR NR 5 5 5 NR 6 NR NR NR NR NR NR NR June 2004
educational programs.
AIDS prevention instruc-
tion occurs at least once in
junior high or middle school
2.1 8 NR 8 8 9 NR NR 10 NR NR NR NR NR NR NR Implemented
and once in high school and
is consistent with the CDE’s
1994 Health Framework.
26
Pupil
Achievement
Pupil Achievement
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
NR
not
reviewed
Pupil
Achievement
27
Pupil Achievement
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
NR
not
reviewed
On a yearly basis, the district
notifies all 11th and 12th
2.2 grade students regarding the 6 NR NR 7 8 NR NR 9 NR NR NR NR NR NR NR Implemented
California High School Profi-
ciency Examination.
Class time is protected for
2.3* 6 NR NR 7 8 8 9 9 10 10 10 10 10 10 10 Implemented
student learning.
Categorical and compensatory
program funds supplement,
2.4 and do not supplant services 0 3 4 5 6 NR NR 6 NR NR NR NR NR NR NR June 2002
and materials to be provided
by the district.
A requirement is in place
for passing of a basic skills
2.5 8 NR NR 8 10 NR NR 10 NR NR NR NR NR NR NR Implemented
proficiency examination by
instructional aides.
The general instruction pro-
gram adheres to all require-
2.6* 5 6 6 7 7 7 8 9 9 9 10 10 10 10 10 Implemented
ments set forth in (EC 51000-
52950).
All incoming kindergarten
students will be admitted
2.7 following board-approved 8 NR NR 9 10 NR NR 10 NR NR NR NR NR NR NR Implemented
policies and administrative
regulations.
The district shall inform par-
ents of the test scores of their
2.8 8 NR NR 9 10 NR NR 10 NR NR NR NR NR NR NR Implemented
children, and provide general
explanation of these scores.
The district shall be account-
able for student results by
using evaluative information
regarding the various levels
2.9* 2 NR NR 5 6 6 7 7 8 8 9 9 10 10 10 Implemented
of proficiency and allocating
educational resources to as-
sure the maximum educational
opportunity for all students.
Student achievement will be
measured using standard-
ized achievement tests and a
2.10* 0 NR NR 5 6 6 7 8 8 8 9 9 10 10 10 Implemented
variety of measurement tools,
ie., portfolios, projects, oral
reports, etc.
28
Pupil
Achievement
Pupil Achievement
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
NR
not
reviewed
Facilities Management Standards
The following standards were identified as needing to reach a rating of 8 to be deemed compli-
ant. If not already presented in response to a Section of the Consent Decree, these standards ap-
pear in the following pages. A chart of the Facilities Management standards is included to pro-
vide an overview of the ratings of the standards over time and the status of their implementation.
1.3 See Consent Decree Section 14
1.6
1.7
1.8 See Consent Decree Section 16
1.9 See Consent Decree Section 15
1.12 See Consent Decree Section 9 or 18
1.14 See Consent Decree Section 16 or 18
1.17
2.1 See Consent Decree Section 25
2.3
2.4
2.5
2.6
3.4
3.8
3.10 See Consent Decree Section 25
6.2
6.3
8.5
8.6
8.8
8.9
8.10 See Consent Decree Section 17
8.12
9.3 See Consent Decree Section 21
9.4 See Consent Decree Section 7
9.7
9.8 See Consent Decree Section 10
9.10
9.11 See Consent Decree Section 18
Facilities Management
1.6 School Safety - Monitoring of Bus Loading/Unloading Areas for Safety
Professional Standard
Bus loading and unloading areas, delivery areas, and parking and parent loading/unloading areas
are monitored on a regular basis to ensure the safety of the students, staff and community. Stu-
dents, employees and the public should feel safe at all times on school premises.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district has contracted its home-to-school and student field trip busing services to an
outside vendor since September 2000. The district’s contract with First Student ended
August 30, 2004. The district contracted with another bus company, Durham School
Services, in September 2004. The district assessed and provided feedback to the new
transportation contractor at the end of the 2004-05 year.
2. The bus routes and pick up points were established by the district and provided to the
new transportation contractor. The district attempts to enforce the walking distances
included in district policy. However, board response to parent complaints resulted in
exceptions for some schools to the walking distances policy and increased expenditures
beyond the budget.
3. A tri-fold “Bus Rider’s Handout” was prepared for student bus riders and provides safety
tips for students when waiting for the bus, getting on the bus, riding the bus, and getting
off the bus.
4. The district has implemented a new software program, Planware Systems, for bus routing
for the home-to-school transportation program. The system is also able to plan for future
school boundary changes and adjusted routes. School maps and bus route information
will be available to parents with internet access by entering an address online.
5. The district continues to monitor the bus loading and unloading areas, and the traffic
patterns around the campuses. Special student loading zones have been created at several
school sites. The architectural plans for new schools in the district include designs for
new bus loading/unloading points.
6. The district has a good working relationship with the City of Compton and recently
worked on a joint project with the city which received a “Safe Route to School” grant.
The district and the city examined school drop off areas, red curbed areas, and traffic
patterns to assess any safety hazards. Remedies have included the installation of flashing
lights, crosswalks, signs indicating bus loading and unloading areas and student drop
off areas, and wider sidewalks in some school areas. The district and the city together
provide 78 crossing guards at various school sites.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: 6
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
1.7 School Safety - Installation and Operation of Outside Security Lighting
Professional Standard
Outside lighting is properly placed and monitored on a regular basis to ensure the operability/
adequacy of such lighting to ensure safety while activities are in progress in the evening hours.
Outside lighting should provide sufficient illumination to allow for the safe passage of students
and the public during after hour activities. Lighting should also provide security personnel with
sufficient illumination to observe any illegal activities on campus.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district’s 28 modernization projects are expected to be completed by summer
2006. Many of the lights and electrical components at the district’s campuses have been
retrofitted to be more energy efficient. More power is available to the sites although less
energy is utilized with the improved systems.
2. The district has worked to upgrade all electrical systems and implement energy
conservation practices.
3. Periodic, unannounced school visits continue to be conducted by district staff and
FCMAT representatives to monitor campus facilities.
4. The district’s 28 modernization projects have upgraded exterior as well as interior
electrical systems. The district has an inventory of new light fixtures and lamps in its
warehouse.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: 4
February 2000 Rating: Not Reviewed
August 2000 Rating: 4
February 2001 Rating: 5
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 9
August 2003 Rating: 9
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
1.17 School Safety - All Exits are Free of Obstructions
Legal Standard
All exits are free of obstructions. [CCR Title 8 §3219]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. All schools have an operational fire alarm system in place. While schools underwent
modernization, school site security staff was assigned fire watch responsibilities.
2. Plant managers and site custodial staffs receive structured monthly training workshops
to improve site safety and cleanliness. Staff has been directed to keep storage areas clean
and all exits free of obstructions.
3. Intrusion alarms at school sites were upgraded in April 2004 by the security alarm
provider, Advance Alarm. The alarms have improved security of district property and
negated the need for padlocking doors.
4. Illuminated exit signs have been placed at exit doors in gyms, auditoriums and cafeterias
at two heights, over exit doors and at knee-high level in case smoke forces evacuees to
crawl along the floor toward the exits. Inoperable exit lights are being replaced with
liquid electronic display (LED) signs.
5. Random, unannounced site inspections continue to be conducted to monitor the sites.
Standard Implemented: Fully - Sustained
February 1999 Rating: 5
August 1999 Rating: 5
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 7
August 2001 Rating: 8
February 2002 Rating: 9
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
2.3 Facility Planning - Efforts to Seek State and Local Matching Funds
Professional Standard
Compton Unified School District should seek state and local funds.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district continually seeks state and local funding for facilities improvement projects.
For example, the district sought $13 million in facilities funds for enrollment growth
based on the district’s 2004 student enrollment. Enrollment in 2005 was projected to
slightly decline, and enrollment decline is expected to continue for several years.
2. Prior to 2002, the district received some hardship funds from the state for facilities
projects after three failed attempts to win passage of a local bond. Before state and local
bond funds were available, the district used its general funds and deferred maintenance
funds to address the safety needs identified in the Facilities Master Plan.
3. The state passed a General Obligation Bond (GOB), Proposition 47, in November 2002
and state funds to support the district’s approved projects became available.
4. In November 2002 the district passed a local $80 million General Obligation Bond,
Measure I, for the district’s modernization and new construction projects.
5. The district board approved a Certificate of Participation (COP) to initially fund the
construction of the new William J. Clinton Elementary School, as extreme campus
overcrowding could not wait for the passage of Measure I.
6. The district sold $40 million of the $80 million Measure I general obligation bonds
during the 2003-04 school year in the first phase of bond sales. $20 million in bonds
were sold in July 2004 in a second phase of bond sales. The final $20 million of bonds
will be sold in spring 2006 to complete remaining projects and retire the COP used to
build Clinton Elementary School.
7. Visitors from the State Allocation Board, the Office of Public School Construction, and a
state senator visited the district in fall 2005 to view the facilities under construction, and
were complimentary of the district’s building program.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 5
August 1999 Rating: 6
February 2000 Rating: 7
August 2000 Rating: 8
February 2001 Rating: 8
August 2001 Rating: 9
February 2002 Rating: 10
August 2002 Rating: 10
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
2.4 Facility Planning - Existence of a District Facility Planning Committee
Professional Standard
Compton Unified School District should have a facility planning committee.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district established a facilities master plan committee that included a wide
representation of parents and community members to assist in the development of the
district’s Facilities Master Plan. The committee remained active to address other district
facilities concerns, such as determining the need for two new elementary schools,
realigning school boundaries, and establishing the student walking distances.
2. The committee was active in the discussion of the Certificate of Participation (COP) for
the new Clinton Elementary School, and in the work to pass the district’s $80 million
General Obligation Bond, Measure I.
3. Although the facilities master plan committee is no longer active, the districtwide safety
committee continues to meet regularly and discuss facilities concerns as part of their
agenda.
4. The governing board has established a facilities sub-committee of two board members
and district staff to monitor facilities conditions.
5. The district conducts several “town hall” meetings each year with the community to
discuss district operations, including facilities concerns.
6. The district has also established a bond oversight committee to oversee the projects
to be supported by the $80 million General Obligation Bond passed by the district in
November 2002. The oversight committee has met regularly once a month since April
2003. Committee members represent parents and community members in the district.
At two board meetings in January and February 2005, three members were added to the
committee increasing the membership from 13 to 16 members. However, when two
committee members resigned and one member passed away, reducing the committee
again to 13, the board agreed to keep the membership to 13 members. In January
2006, the board cancelled the February 2006 oversight committee meeting, planning to
reconstitute the committee membership prior to the March 2006 meeting.
7. Financial and Performance Audits on the Measure I bond funds were conducted for the
2002-03 and 2003-04 years. The audit report was presented to the oversight committee
for review in June 2005. The report contained no findings by the auditors.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: 2
February 2000 Rating: 4
August 2000 Rating: 7
February 2001 Rating: 8
August 2001 Rating: 9
February 2002 Rating: 10
August 2002 Rating: 10
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
0 Facilities Management
2.5 Facility Planning - Properly Staffed and Funded Facility Planning Function
Professional Standard
Compton Unified School District should have a properly staffed and funded facility planning
department.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The position of Chief Facilities Officer is a cabinet level management position.
2. The Facilities Department has restructured, downsizing its staff until another bond
measure is passed. The Facilities Planning Department currently includes a Facilities
Director, a Facilities Budget Analyst, and two Facilities Planners (reduced from
five planners in 2005-06 as facilities projects neared completion). The district hired
construction management firms as project managers to oversee and assist in the
completion of the district’s construction projects. GKK Construction is the district’s
construction manager.
3. Several facilities managers have taken classes in the school construction process offered
by the University of California at Riverside and are certified in Facilities Planning.
Training for facilities managers is ongoing to enable staff to remain current in changing
trends and technology in the construction field.
4. Employees are evaluated regularly. Numerous training opportunities are provided for
staff to improve their job skills.
5. Evaluation of plant managers has been shifted from the site principals to the Chief
Facilities Officer and his designee(s), with input from the site principal.
6. Staffing for the Maintenance Division was increased to include additional positions in the
trade areas, and several coordinator positions.
7. The Facilities Division has a good team; they keep abreast of projects, and receive and
provide appropriate staff training. Staff members are recognized by the district for their
accomplishments.
Facilities Management
Standard Implemented: Fully- Sustained
February 1999 Rating: 4
August 1999 Rating: 5
February 2000 Rating: Not Reviewed
August 2000 Rating: 7
February 2001 Rating: 7
August 2001 Rating: 8
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
2.6 Facility Planning - Implementation of an Annual Capital Planning Budget
Professional Standard
Compton Unified School District should develop and implement an annual capital planning bud-
get.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district completed a Facilities Implementation Plan, approved effective August
10, 2001, to implement the district’s Comprehensive Facilities Master Plan adopted
in July 1999. The district utilized general fund and deferred maintenance dollars for
modernization projects until state and local bond funds were available.
2. The state passed a General Obligation Bond in November 2002, and state funds to
support the district’s approved projects became available.
3. In November 2002 the district passed a local $80 million General Obligation Bond.
4. The funds available from the state and local bonds have allowed the district to implement
the facilities projects identified in its Comprehensive Facilities Master Plan.
5. A few board members have been highly critical of the district’s construction projects
and operations, not fully understanding the complexities and timelines necessary to
accomplish the construction program being aggressively implemented by the district.
The district must continue to provide the board with sufficient information to keep them
fully informed of the progress of the building program.
6. The district hopes to promote another general obligation bond to implement additional
projects identified in its Facilities Master Plan.
Facilities Management
Standard Implemented: Fully- Sustained
February 1999 Rating: 5
August 1999 Rating: 6
February 2000 Rating: 7
August 2000 Rating: 8
February 2001 Rating: 8
August 2001 Rating: 9
February 2002 Rating: 10
August 2002 Rating: 10
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
3.4 Facilities Improvement and Modernization - Determination of Maximum
Eligibility for State Funding
Professional Standard
The CUSD consistently reviews and monitors its eligibility for state funding so as to capitalize
upon maximal funding opportunities.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district consistently reviews and monitors its eligibility for state funding. For
example, the district sought $13 million in facilities funds for enrollment growth based
on the district’s 2004 student enrollment. Student enrollment in 2005-06 was projected to
slightly decline, and the district is expected to experience declining enrollment for several
more years.
2. In prior years, the district regularly submitted applications to maintain its hardship
eligibility status in order to receive 100% of state funding, instead of 80% for
modernization projects and 50% for new construction. The district lost its hardship
status with the passage of its $80 million Measure I local General Obligation Bond in
November 2002. The district was then required to provide its share of matching funds for
modernization (20%) and new construction (50%) projects.
3. The district sold $40 million of the $80 million in bond sales in the 2003-04 school year,
$20 million in July 2004 for the 2004-05 school year and the remaining $20 million in
spring 2006 for the 2005-06 school year to complete the modernization projects and to
retire the Certificate of Participation for the construction of Clinton Elementary School.
Facilities Management
Standard Implemented: Fully- Sustained
February 1999 Rating: 4
August 1999 Rating: 7
February 2000 Rating: 8
August 2000 Rating: 8
February 2001 Rating: 9
August 2001 Rating: 10
February 2002 Rating: 10
August 2002 Rating: 10
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
3.8 Facilities Improvement and Modernization - Approval of Plans and Speci-
fications Prior to Contract Award
Legal Standard
The CUSD obtains approval of plans and specifications from the Division of the State Architect
and the Office of Public School Construction (when required) prior to the award of a contract to
the lowest, responsible bidder. [EC 17263, 17267]
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district’s 28 district modernization projects and 8 new construction projects have
long been approved by both the California Department of Education (CDE) and the
Department of the State Architect (DSA).
2. As state funds were not available to initiate the district’s approved modernization
and new construction projects, the district governing board approved a Certificate of
Participation (COP) for $16 million in spring 2002 to construct the William Jefferson
Clinton Elementary School which was completed in January 2003.
3. In November 2002 the state passed a General Obligation Bond (GOB) Proposition 47,
making state funds available for approved projects.
4. In November 2002 the district passed a local $80 million General Obligation Bond to
modernize its aging facilities but lost its hardship status which would have provided
100% in state funding for its construction projects. The district is required to provide its
share of matching funds for modernization (20%) and new construction (50%) projects.
The district’s local GOB provides the resource for the district’s matching funds.
5. Completion of the district’s 28 modernization projects is expected by summer 2006.
6. Additional new construction projects in the “pipeline” for approval include math/science
classrooms for Dominguez High School and the new Liberty Elementary School at
Tamarind Avenue. These projects have received approval from the Division of the State
Architect (DSA), the California Department of Education (CDE), and the California
Environmental Quality Act (CEQA) and are awaiting approval from the Office of Public
School Construction (OPSC).
7. The district’s bid process is well established and implemented. Contracts are awarded to
the lowest, responsible bidder.
8. A board member previously questioned the district’s bidding process, objecting that
contracts were not awarded to local, minority contractors. Some previous board members
appeared indifferent that the lack of timely board action could have resulted in the loss
of millions of dollars in state funding to support the district’s construction program. The
district can more effectively implement its facilities master plan as intended with support
of the governing board.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: 3
August 2000 Rating: 6
February 2001 Rating: 7
August 2001 Rating: 8
February 2002 Rating: 9
August 2002 Rating: 9
February 2003 Rating: 10
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
6.2 Special Education Facilities - Equity, Appropriate to Educational Program
Professional Standard
The CUSD provides facilities for its Special Education programs which ensure equity with other
educational programs within the district and provides appropriate learning environments in rela-
tion to educational program needs.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. Modernization and new construction projects have been designed to provide full access
for handicapped students. Elevators have been installed at several schools with two-story
buildings as part of the modernization. Other accommodations include handicapped-
operable doors, chair lifts, larger restroom stalls, modified showers in the locker rooms,
and availability of hot water showers.
2. Student access has been the first priority addressed at each site under modernization. The
district assessed the “path of travel” for students through the campus to identify the areas
of the campus where accommodations needed to be made.
3. The district reports that all school sites are handicapped accessible. The modernized
facility in the Compton High School administration building’s basement is handicapped
accessible with ramps and an elevator.
4. Special education signage has been removed as many special education classes have been
integrated among regular classes.
5. The Facilities Division considers maintenance requests to meet the needs of the special
education population a high priority.
6. Site principals are expected to consider the needs of their students when assigning the
various instructional programs to existing site facilities and classrooms.
7. A new special education center, a joint effort between the Los Angeles County Office of
Education and the district, is located at Caldwell Elementary. The facility is equipped
with additional doors, a wheel chair lift, handrails and restrooms. Path of travel and
accessibility of countertops were also considered. The Center serves students with severe
disabilities who are enrolled in the county special education program.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 4
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 4
February 2001 Rating: 5
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 8
August 2003 Rating: 9
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
0 Facilities Management
6.3 Special Education Facilities - Adequacy for Instructional Program Needs
Professional Standard
The CUSD provides facilities for its Special Education programs which provide appropriate
learning environments in relation to educational program needs.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The passage of the district’s local general obligation bond enabled the district to
implement its planned modernization projects to provide more appropriate facilities for
all district programs, including special education.
2. Modernization and new construction projects were designed to provide full access
for handicapped students. The district reports that all school sites are handicapped
accessible. The district assessed the “path of travel” for students through the campus to
identify the areas of the campus where accommodations needed to be made.
3. The district has upgraded special education facilities at various sites with facilities
adjustments, thus improving the learning environments for special education students.
Elevators have been installed at several schools with two-story buildings as part of the
modernization. Other accommodations include handicapped-operable doors, chair lifts,
larger restroom stalls, modified showers in the locker rooms, and availability of hot water
showers.
4. Attention has been given to providing proper lighting and air conditioning for special
education classrooms, and renovating the restrooms for ease of use by disabled students.
5. A new special education center, a joint effort between the Los Angeles County Office of
Education and the district, is located at Caldwell Elementary. The Center serves students
with severe disabilities who are enrolled in the county special education program.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 4
August 1999 Rating: Not Reviewed
February 2000 Rating: 4
August 2000 Rating: 4
February 2001 Rating: 5
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 8
August 2003 Rating: 9
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
8.5 Facilities Maintenance and Custodial - Adequate Maintenance Records
and Inventories
Professional Standard
Adequate maintenance records and reports are kept, including a complete inventory of supplies,
materials, tools and equipment. All employees required to perform maintenance on school sites
should be provided with adequate supplies, equipment and training to perform maintenance tasks
in a timely and professional manner. Included in the training is how to inventory supplies and
equipment and when to order or replenish them.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district utilizes the MC II school-based software to maintain its supplies records and
inventory.
2. The department has established a separate purchase order system for the purchase of tools
and equipment, as opposed to supplies, to maintain greater accountability over tools and
equipment.
3. The district continues to use the maintenance request flow chart and forms established to
track all maintenance requests from the sites.
4. The district utilizes a five-day completion time line to complete the requested
maintenance. If a request is complex and will require more days to complete, the request
is assigned to the facilities division as a project, and sites are informed that the five-day
time line cannot be met, with an explanation and scheduled date of completion. A Project
Status Report is maintained.
5. The maintenance department performs weekly, monthly, and annual material checks.
6. The department reports that an adequate inventory of materials and equipment is
maintained with the maintenance record procedure.
7. School site employees are provided with the supplies, materials and tools necessary to
perform their work.
8. The maintenance department provides training workshops and regular staff meetings to
keep staff informed and up-to-date. Monthly meetings of plant managers are conducted to
provide training on district processes and procedures, and to improve job skills.
Facilities Management
Standard Implemented: Fully- Sustained
February 1999 Rating: 0
August 1999 Rating: 6
February 2000 Rating: 6
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
8.6 Facilities Maintenance and Custodial - Procedures for Evaluation of Main-
tenance and Operations Staff
Professional Standard
Procedures are in place for evaluating the work quality of maintenance and operations staff. The
quality of the work performed by the maintenance and operations staff should be evaluated on a
regular basis using a board-adopted procedure which delineates the areas of evaluation and the
types of work to be evaluated.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. Annual evaluations are conducted of all permanent employees in the Facilities Division.
Employees have clear expectations for their work performance.
2. A maintenance handbook that includes standards for work performance and levels of
cleanliness has been developed for use at all sites.
3. The facilities division has provided plant managers with a sample structured work
schedule for site maintenance employees for each day and each week. A sample template
has been developed for plant managers to modify for their individual site needs.
4. The supervision and evaluation of plant managers and staff has been transferred from
the site principal to the Chief Facilities Officer or his designee(s). The site principals
share the supervisory responsibility of plant staff, and continue to provide input to the
evaluations.
5. The district’s personnel office provides ongoing training workshops for supervisory
personnel in evaluation procedures and in properly documenting the unsatisfactory
performance of employees. Workshops include discussion on how to monitor an
employee’s performance, and stress the importance of meeting probationary evaluation
deadlines.
6. Performance evaluations are conducted to assess the work quality of the staff. The
updated evaluation form now includes a “quality of work” section. The probation period
is being taken seriously by both supervisor and new employee, and new employees are
being closely monitored.
7. The maintenance division is addressing employee absenteeism. An attendance review is
conducted every 90 days with employees demonstrating high absenteeism.
8. Safety training has reduced the number of industrial accidents reported. The district has
implemented a “return to work” program to provide light duty for injured workers.
9. Staff reports that the board, on several occasions, has declined to terminate an
unsatisfactory employee recommended for termination by facilities administrators. This
has been demoralizing for both the administrators who have taken the time to document
the unsatisfactory performance and for other employees who are doing their jobs well and
perceive that there is no consequence for poor performance.
Facilities Management
Standard Implemented: Fully- Sustained
February 1999 Rating: 5
August 1999 Rating: Not Reviewed
February 2000 Rating: 5
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
8.8 Facilities Maintenance and Custodial - Availability of Custodial Supplies
and Equipment
Professional Standard
Necessary supplies, tools and equipment for the proper care and cleaning of the school(s) are
available to staff. Operational staff should be expected to keep the campuses clean. In order for
the staff to meet these expectations, they must be provided with the necessary supplies, tools and
equipment as well as the training associated with the proper use of such.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. School site employees are being provided the supplies, materials and tools necessary to
perform their work. All supplies and materials are purchased centrally by the facilities
division, and sites request supplies as needed. Equipment for the sites is purchased by
the maintenance department.
2. Ongoing training workshops and staff meetings are conducted to keep staff informed and
up-to-date. Monthly meetings of plant managers are held to provide training on district
processes and procedures, and to improve job skills. Managers are expected to provide
the training to site employees.
3. The supervision and evaluation of plant managers and staff has been transferred from
the site principal to the Chief Facilities Officer or his designee(s). The site principals
share the supervisory responsibility for plant staff, and continue to provide input to the
evaluations.
4. A maintenance handbook that includes standards for work performance and levels of
cleanliness has been developed for use at all sites.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 4
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
8.9 Facilities Maintenance and Custodial - Implementation of a Preventive
Maintenance Program
Professional Standard
The district has an effective preventive maintenance program. The district should have a written
preventive maintenance program that is scheduled and followed by the maintenance staff. This
program should include verification of the completion of work by the supervisor of the mainte-
nance staff.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district has determined life expectancies of various facilities, such as roofs, asphalt,
painting, etc. and has developed a replacement schedule. The maintenance department
has scheduled regular maintenance for recurring projects such as tree trimming, checking
heating and air conditioning systems, cleaning gutters and drains, boiler checks, etc.
Some projects are scheduled for maintenance during the summer months when school is
not in session.
2. The district, with assistance from its architects, has developed maintenance specifications
for all electrical and mechanical work. These specifications establish standards that help
provide conservation efficiency. The specifications are used in all repair and maintenance
work conducted by the district. Lighting fixtures are continually being upgraded.
3. The district continues to use its established maintenance request flow chart and forms to
track all maintenance requests from the sites.
4. Monthly training meetings are held with plant managers to provide continual training on
safety procedures, ways of improving work performance, and expectations on complying
with district processes and procedures.
5. The modernization work at the district’s sites is expected to be completed by summer
2006. The maintenance division must ensure the modernized facilities stay in good
condition.
6. The district will institute a preventive maintenance program for the updated mechanical
systems in the newly modernized facilities. The district hopes to add a plumber, another
electrician, two HVAC specialists and two maintenance worker II positions in the near
future. The 3% required maintenance reserve in the general fund will be used to support
the ongoing maintenance of facilities.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 5
August 1999 Rating: Not Reviewed
February 2000 Rating: 5
August 2000 Rating: 5
February 2001 Rating: 5
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 9
August 2003 Rating: 10
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
0 Facilities Management
8.12 Facilities Maintenance and Custodial - Implementation of a Planned
Program Maintenance System
Professional Standard
The district has implemented a planned program maintenance system. The district should have
a written planned program maintenance system that includes an inventory of all facilities and
equipment that will require maintenance and replacement. This program should include purchase
prices, anticipated life expectancies, anticipated replacement time lines and budgetary resources
necessary to maintain the facilities.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district has determined the life expectancies for its roofs, asphalt, painting,
equipment, etc., and has developed a replacement schedule.
2. The maintenance department schedules regular maintenance for recurring projects such
as tree trimming, checking heating and air conditioning systems, cleaning gutters and
drains, boiler checks, etc. Some maintenance projects are scheduled during the summer
when school is not in session.
3. The facilities division continues to use a computer software program to maintain a
database of its maintenance equipment inventory. The projected life expectancy of the
equipment is included to determine a schedule of maintenance and replacement of items.
4. The district, with assistance from its architects, has developed maintenance specifications
for all electrical and mechanical work. These specifications establish standards that help
provide conservation efficiency. The specifications are used in all repair and maintenance
work conducted by the district.
5. The district has manuals for cleaning standards, health and safety issues, and inventory.
6. The modernization work at the district’s sites is expected to be completed by summer
2006. The maintenance division must ensure the modernized facilities stay in good
condition.
7. The district will institute a preventive maintenance program for the updated mechanical
systems in the newly modernized facilities and plans to add several maintenance
positions in the near future. The 3% required maintenance reserve in the general fund
will be used to support the ongoing maintenance of facilities.
8. Training is being provided for district maintenance staff on the newly installed HVAC
systems, alarm systems, lights, bells and clock systems.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: 2
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 5
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 8
August 2003 Rating: 8
February 2004 Rating: 9
August 2004 Rating: 9
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
9.7 Instructional Program Issues - Adequate Heating and Ventilation Exists
in All Schools
Professional Standard
All schools shall have adequate heating and ventilation.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district’s modernization and new construction projects have addressed heating and
ventilation at the district schools. New HVAC systems and upgrades of lighting/electrical
systems were included in the scope of the modernization project plans to provide
comfortable learning environments for students.
2. Several schools have HVAC systems that are totally automated.
3. The district utilized $60 million in modernization funds to upgrade electrical components
throughout the district, including new transformers, a retrofit of lights and other electrical
upgrades. More power is available to the sites but the sites are utilizing less energy
because of the energy efficient components. The district’s 28 modernization projects are
expected to be completed by summer 2006.
4. The district worked with ENVIRON, now Chevron, to assess ways to increase energy
efficiency in the district. All projects identified in the Facilities Master Plan address
energy conservation in proposed equipment, infrastructure, and construction.
5. The Facilities Division, along with the district’s architects, has developed master
specifications for the installation of all electrical and mechanical equipment. The
district has defined district standards for unit brands and types of systems to standardize
maintenance and replacement component issues.
6. Training is being provided for district maintenance staff on the newly installed HVAC
systems, alarm systems, lights, bells and clock systems.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: 2
February 2000 Rating: 2
August 2000 Rating: 4
February 2001 Rating: 5
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Rating: 9
August 2003 Rating: 9
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
9.10 Instructional Program Issues - Environment Conducive to High Quality
Teaching Learning
Professional Standard
The learning environments provided within respective school sites within the CUSD are condu-
cive to high quality teaching and learning.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
This standard is fully implemented and the Consent Decree stipulation has been met.
1. The district is continually upgrading its facilities to improve the learning environment
for students. Much thought is given to color schemes, the use of clear glass blocks
for lighting, adequate sized walkways, landscaping, traffic patterns, safety concerns,
handicapped access, etc. to make the learning environment more attractive.
2. The district initiated an aggressive construction program in 2003 to complete 28
modernization and 8 new construction projects. The district received Proposition 47 state
bond funds to support its construction program and successfully passed an $80 million
local general obligation bond, Measure I, for the district’s required matching funds. The
district expects all of the modernization projects to be completed by summer 2006.
3. The district completed the infrastructure for placing computers in every classroom, and is
constantly upgrading the networking system. Additional underground conduits have been
installed at all sites. The district has benefited from its e-rate applications over the last
several years to improve technology connectivity.
4. The district has installed five computer drops in each classroom, designated computer
labs at the sites, and included white boards, wall brackets for television sets, and internet
access for all modernized classrooms.
5. The telephone system in the district has been upgraded. Telephones have been placed in
classrooms districtwide.
6. The condition of school site facilities continues to be monitored during periodic,
unannounced site visits to school campuses.
Facilities Management
Standard Implemented: Fully - Sustained
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 4
February 2001 Rating: 4
August 2001 Rating: 5
February 2002 Rating: 6
August 2002 Rating: 7
February 2003 Rating: 8
August 2003 Rating: 9
February 2004 Rating: 10
August 2004 Rating: 10
February 2005 Rating: 10
August 2005 Rating: 10
February 2006 Rating: 10
Implementation Scale:
Facilities Management
Chart of
Facilities Management Standards
Progress Ratings Toward Implementation of the Serna v Eastin
Consent Decree
Facilities Management
Facilities Management
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
39
NR
not
reviewed
All school administrators
should be thoroughly familiar
with the California Depart-
1.1 ment of Education, Civil De- 8 NR NR NR 10 NR NR NR NR NR NR NR NR NR NR Implemented
fense and Disaster Planning
guide for School Officials,
1972.
The district includes the
appropriate security devices
1.2 in the design of new build- 8 NR 8 NR NR NR NR 10 NR NR NR NR NR NR NR Implemented
ings as well as in modernized
buildings.
Demonstrate that a plan of
security has been developed
which includes adequate
1.3* 5 6 7 7 8 8 9 9 10 10 10 10 10 10 10 Implemented
measures of safety and
protection of people and
property.
To ensure that the custodial
and maintenance staff are
regularly informed of re-
1.4 4 6 NR NR NR 7 NR NR NR NR NR NR NR NR NR June 2001
strictions pertaining to the
storage and disposal of flam-
mable or toxic materials.
The district has a document-
ed process for the issuance of
master and sub-master keys.
A district-wide standard-
1.5 0 6 NR NR NR 7 NR 8 NR NR NR NR NR NR NR Implemented
ized process for the issuance
of keys to employees must
be followed by all district
administrators.
40
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
Bus loading and unloading
areas, delivery areas, and
parking and parent loading/
unloading areas are moni-
tored on a regular basis to
1.6* 0 6 NR 6 6 6 7 8 9 10 10 10 10 10 10 Implemented
ensure the safety of the stu-
dents, staff and community.
Students, employees and the
public should feel safe at all
times on school premises.
Outside lighting is properly
placed and monitored on a
regular basis to ensure the
operability/adequacy of such
lighting to ensure safety
while activities are in prog-
ress in the evening hours.
Outside lighting should pro-
1.7* vide sufficient illumination 0 4 NR 4 5 6 7 8 9 9 10 10 10 10 10 Implemented
to allow for the safe passage
of students and the public
during after-hours activities.
Lighting should also pro-
vide security personnel with
sufficient illumination to
observe any illegal activities
on campus.
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
41
NR
not
reviewed
The district has a graffiti and
vandalism plan. The district
should have a written graffiti
and abatement plan that
is followed by all district
1.8* 6 6 NR 7 7 8 9 9 9 10 10 10 10 10 10 Implemented
employees. The district
provides district employees
with sufficient resources to
meet the requirements of the
abatement plan.
Each public agency is
required to have on file a
1.9* written plan describing 3 3 NR 5 6 7 8 9 10 10 10 10 10 10 10 Implemented
procedures to be employed in
case of emergency.
Each elementary and
intermediate school at least
once a month, and in each
1.10 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
secondary school not less
than twice every school year,
shall conduct a fire drill.
Maintenance/custodial
personnel have knowledge of
chemical compounds used in
1.11 0 5 NR NR NR 6 NR NR NR NR NR NR NR NR NR June 2001
school programs that include
potential hazards and shelf
life.
Building examinations are
performed, and required
1.12* actions are taken by the 6 6 NR 6 7 8 9 9 10 10 10 10 10 10 10 Implemented
governing board upon report
of unsafe conditions.
42
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
Each school which is entirely
enclosed by a fence or
partial buildings must have
a gate of sufficient size
1.13 to permit the entrance of 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
ambulances, police and fire
fighting equipment. Locking
devices shall be designed to
permit ready entrance.
Sanitary, neat and clean
conditions of the school
premises exist and the
1.14* 0 4 NR 6 6 7 8 9 10 10 10 10 10 10 10 Implemented
premises are free from
conditions that would create
a fire hazard.
The Injury and Illness
Prevention Program (IIPP)
1.15 requires periodic inspections 9 9 NR NR NR NR NR 10 10 10 NR NR NR NR NR Implemented
of facilities to identify
conditions.
Appropriate fire extinguish-
ers exist in each building and
1.16 6 6 NR 6 NR NR NR 8 9 NR NR NR NR NR NR Implemented
current inspection informa-
tion is available.
All exits are free of obstruc-
1.17* 5 5 NR 6 7 8 9 9 9 10 10 10 10 10 10 Implemented tions.
A comprehensive school
safety plan exists for the
1.18 8 NR NR NR NR NR NR 10 NR NR NR NR NR NR NR Implemented
prevention of campus crime
and violence.
1.19 An emergency plan exists. 8 8 NR NR NR NR NR 10 NR NR NR NR NR NR NR Implemented
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
43
NR
not
reviewed
Requirements are followed
1.20 pertaining to underground 3 6 NR NR NR 6 7 NR NR NR NR NR NR NR NR June 2001
storage tanks.
All asbestos inspection and
asbestos work completed
in the US is performed by
1.21 3 4 NR 6 7 NR NR 8 NR NR NR NR NR NR NR Implemented
Asbestos Hazard Emergency
Response Act (AHERA) ac-
credited individuals.
All playground equipment
meets safety code regula-
1.22 tions and is inspected in a 8 NR NR NR NR NR NR 10 NR NR NR NR NR NR NR Implemented
timely fashion as to ensure
the safety of the students.
Safe work practices exist
1.23 with regard to boiler and 6 NR NR NR NR 7 NR 8 NR NR NR NR NR NR NR Implemented
fired pressure vessels.
Maintenance of Materials
1.24 8 NR NR NR NR NR NR 10 NR NR NR NR NR NR NR Implemented
Safety Data Sheets.
The district maintains a
comprehensive employee
safety program. Employees
should be aware of the dis-
1.25 trict safety program and the 3 3 NR 4 6 NR NR NR NR NR NR NR NR NR NR January 2001
district provides in-service
training to employees on the
requirements of the safety
program.
44
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
The district conducts peri-
odic safety training for em-
ployees. District employees
1.26 3 3 NR 4 6 NR 7 8 NR NR NR NR NR NR NR Implemented
should receive periodic train-
ing on the safety procedures
of the district.
The district should conduct
periodic first aid training for
1.27 0 5 NR 6 7 NR NR 8 NR NR NR NR NR NR NR Implemented
employees assigned to school
sites.
Compton Unified School
District should have a long-
2.1* O 5 6 7 8 9 10 10 10 10 10 10 10 10 10 Implemented
range school facilities master
plan.
Compton Unified School
District should possess a
California State Department
2.2 0 7 NR 8 NR NR NR NR NR NR NR NR NR NR NR Implemented
of Education Facilities Plan-
ning and Construction Guide
(dated 1991).
Compton Unified School Dis-
2.3* trict should seek state and 5 6 7 8 8 9 10 10 10 10 10 10 10 10 10 Implemented
local funds.
Compton Unified School
2.4* District should have a facility 0 2 4 7 8 9 10 10 10 10 10 10 10 10 10 Implemented
planning committee.
Compton Unified School Dis-
trict should have a properly
2.5* 4 5 NR 7 7 8 8 9 10 10 10 10 10 10 10 Implemented
staffed and funded facility
planning department.
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
45
NR
not
reviewed
Compton Unified School
District should develop and
2.6* 5 6 7 8 8 9 10 10 10 10 10 10 10 10 10 Implemented
implement an annual capital
planning budget.
Compton Unified School Dis-
trict should have standards
2.7 0 5 6 NR NR NR NR NR NR NR NR NR NR NR NR July 2002
for real property acquisition
and disposal.
The CUSD seeks and obtains
waivers from the State Al-
2.8 location Board for continued 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
use of its non-conforming
facilities.
The CUSD has established and
utilizes a selection process
2.9 for the selection of licensed 8 NR NR NR 9 NR NR 10 NR NR NR NR NR NR NR Implemented
architectural/engineering
services.
Compton Unified School Dis-
2.10 trict should assess its local 8 NR NR NR 9 NR NR 10 NR NR NR NR NR NR NR Implemented
bonding capacity.
Compton Unified School
District should develop a
2.11 6 NR NR NR 7 NR NR NR 8 NR NR NR NR NR NR Implemented
process to determine debt
capacity.
Compton Unified School
District should be aware of
2.12 and monitor the assessed 6 NR NR NR 7 NR NR NR 8 NR NR NR NR NR NR Implemented
valuation of taxable property
within its boundaries.
Compton Unified School Dis-
2.13 trict should monitor its legal 8 NR NR NR 9 NR NR 10 NR NR NR NR NR NR NR Implemented
bonding limits.
46
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
Compton Unified School Dis-
2.14 trict should collect statutory 3 7 8 9 10 NR NR NR NR NR NR NR NR NR NR Implemented
school fees.
Compton Unified School Dis-
trict should consider devel-
2.15 0 NR 2 4 6 NR NR NR NR NR NR NR NR NR NR June 2001
oping an asset management
plan.
The CUSD has pursued state
funding for joint-use projects
through the filing of applica-
2.16 9 NR NR NR 10 NR NR NR NR NR NR NR NR NR NR Implemented
tions through the Office of
Public Construction and the
State Allocation Board.
The district has a restricted
deferred maintenance fund
and those funds are ex-
pended for maintenance
purposes only. The deferred
3.1 maintenance fund should be 8 8 NR NR 9 NR NR 10 NR NR NR NR NR NR NR Implemented
a stand-alone fund reflecting
the revenues and expenses
for the major maintenance
projects accomplished during
the year.
The CUSD has pursued state
funding for deferred main-
tenance - critical hardship
3.2 needs by filing applications 5 NR NR NR 6 NR 8 9 NR NR NR NR NR NR NR Implemented
through the Office of Public
School Construction and the
State Allocation Board.
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
47
NR
not
reviewed
The CUSD applies to the State
Allocation Board for facili-
3.3 8 NR 9 NR 9 NR 10 NR NR NR NR NR NR NR NR Implemented
ties funding for all applicable
projects.
The district consistently re-
views and monitors its eligi-
3.4* bility for state funding so as 4 7 8 8 9 10 10 10 10 10 10 10 10 10 10 Implemented
to capitalize upon maximal
funding opportunities.
The CUSD establishes and
implements interim housing
plans for use during the con-
3.5 6 7 NR NR NR NR NR NR 8 NR NR NR NR NR NR Implemented
struction phase of modern-
ization projects and/or addi-
tions to existing facilities.
The CUSD has established and
maintains a system for track-
3.6 4 NR NR 6 7 NR 8 NR NR NR NR NR NR NR NR Implemented
ing the progress of individual
projects.
Furniture and equipment
items are routinely included
3.7 6 NR NR 7 NR NR NR NR NR NR NR NR NR NR NR June 2002
within the scope of modern-
ization projects.
The CUSD obtains approval of
plans and specifications from
the Division of the State
Architect and the Office of
3.8* 0 NR 3 6 7 8 9 9 10 10 10 10 10 10 10 Implemented
Public School Construction
(when required) prior to the
award of a contract to the
lowest, responsible bidder.
48
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
All relocatables in use
3.9 throughout the district meet 8 NR NR NR 9 NR NR 10 NR NR NR NR NR NR NR Implemented
statutory requirements.
The CUSD maintains a plan
for the maintenance and
3.10* 0 NR NR 6 6 7 8 9 9 10 10 10 10 10 10 Implemented
modernization of its facili-
ties.
The annual deferred main-
tenance contribution is
made correctly. The district
should annually transfer the
3.11 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
maximum amount that the
district would be eligible for
in matching funds from the
state.
The district actively manages
the deferred maintenance
projects. The district should
review the five-year deferred
maintenance plan annually to
remove any completed proj-
3.12 ects and include any newly 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
eligible projects. The district
should also verify that the
expenses performed during
the year were included in
the state-approved five-year
deferred maintenance plan.
Staff within the CUSD is
knowledgeable of procedures
3.13 5 NR NR NR 7 NR 8 9 10 NR NR NR NR NR NR Implemented
within the Office of Public
School Construction (OPSC).
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
49
NR
not
reviewed
Staff within the CUSD is
knowledgeable of procedures
3.14 5 NR 5 NR 7 NR 8 9 10 NR NR NR NR NR NR Implemented
within the Division of the
State Architect.
The CUSD maintains an ap-
propriate structure for the
4.1 3 NR 4 6 7 NR 8 NR NR NR NR NR NR NR NR Implemented
effective management of its
construction projects.
Change orders are processed
and receive prior approval
from required parties before
4.2 9 NR NR NR 10 NR NR NR NR NR NR NR NR NR NR Implemented
being implemented within
respective construction
projects.
The district maintains ap-
4.3 propriate project records and 6 NR 7 8 NR NR NR 10 NR NR NR NR NR NR NR Implemented
drawings.
Each Inspector of Record
4.4 (IOR) assignment is properly 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
approved.
The district complies with
5.1 9 NR NR NR 10 NR NR NR NR NR NR NR NR NR NR Implemented
formal bidding procedures.
The district has a procedure
5.2 9 NR NR NR 10 NR NR NR NR NR NR NR NR NR NR Implemented
for requests/proposals.
The district maintains files of
conflict of interest state-
ments and complies with
legal requirements. Conflict
5.3 of interest statements should 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
be collected annually by the
superintendent and kept on
file in the superintendent’s
office.
50
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
The CUSD ensures that bidda-
ble plans and specifications
are developed through its
5.4 6 7 7 8 NR NR NR 10 NR NR NR NR NR NR NR Implemented
licensed architects/engineers
for respective construction
projects.
The CUSD ensures that re-
5.5 quests for progress payments 8 NR NR NR 9 NR NR NR NR NR NR NR NR NR NR Implemented
are carefully evaluated.
The district maintains con-
5.6 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
tract award/appeal processes.
The district complies with
California Department of
6.1 Education (CDE) requirements 10 NR 10 NR NR NR NR NR 10 NR NR NR NR NR NR Implemented
relative to the provision of
Special Education facilities.
The CUSD provides facilities
for its Special Education
programs which ensure equity
with other educational pro-
6.2* 4 NR NR 4 5 6 7 8 8 9 9 9 10 10 10 Implemented
grams within the district and
provides appropriate learning
environments in relation to
educational program needs.
The district provides facili-
ties for its Special Educa-
tion programs which provide
6.3* 4 NR 4 4 5 6 7 8 8 9 9 9 10 10 10 Implemented
appropriate learning environ-
ments in relation to educa-
tional program needs.
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
51
NR
not
reviewed
The district applies for state
funding for class size reduc-
tion facilities. The district
7.1 9 NR NR NR 10 NR NR NR NR NR NR NR NR NR NR Implemented should apply for class size
reduction facilities funding
annually.
The CUSD has provided
adequate facilities for the
7.2 additional classes resulting 9 NR NR NR 10 NR NR NR NR NR NR NR NR NR NR Implemented
from the implementation of
Class Size Reduction.
The district has complied
with CDE suggested space
requirements relative to the
7.3 provision of educational en- 0 NR 4 4 4 6 NR NR NR NR NR NR NR NR NR July 2005
vironments for the implemen-
tation of Class Size Reduc-
tion (CSR).
The CUSD has developed a
plan for the provision of per-
7.4 0 NR NR 5 NR NR NR NR NR NR NR NR NR NR NR July 2005
manent facilities in which to
house its CSR programs.
The district should have an
adopted policy for energy
conservation and should take
8.1 3 NR 4 5 NR NR 8 NR NR NR NR NR NR NR NR Implemented
steps to implement an ef-
fective energy conservation
program.
The district should have a
comprehensive analysis of its
8.2 utility bills (all sites) as it 0 5 NR 5 NR NR 8 NR NR NR NR NR NR NR NR Implemented
relates to its energy con-
sumption.
52
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
The district should have
identified all eligible sites
for state funding and should
8.3 have filed an application for 9 NR 9 NR 10 NR NR NR NR NR NR NR NR NR NR Implemented
each eligible site with the
Office of Public School Con-
struction.
The district should have a
policy that incorporates the
Energy Conservation Recom-
8.4 6 NR NR NR 7 NR 8 NR NR NR NR NR NR NR NR Implemented
mendations into its mod-
ernization and construction
projects.
Adequate maintenance
records and reports are kept,
including a complete inven-
tory of supplies, materials,
tools and equipment. All
employees required to per-
form maintenance on school
sites should be provided with
8.5* 0 6 6 6 6 7 8 9 9 10 10 10 10 10 10 Implemented
adequate supplies, equip-
ment and training to perform
maintenance tasks in a timely
and professional manner. In-
cuded in the training is how
to inventory supplies and
equipment and when to order
or replenish them.
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
53
NR
not
reviewed
Procedures are in place for
evaluating the work quality
of maintenance and opera-
tions staff. The quality of
the work performed by the
maintenance and operations
8.6* 5 NR 5 5 6 7 8 9 9 10 10 10 10 10 10 Implemented
staff should be evaluated
on a regular basis using a
board-adopted procedure
which delineates the areas of
evaluation and the types of
work to be evaluated.
Major areas of custodial and
maintenance responsibili-
ties and specific jobs to be
performed have been identi-
fied. Custodial and mainte-
8.7 nance personnel should have 6 NR 6 NR NR NR NR NR NR NR NR NR NR NR NR June 2001
written job descriptions that
delineate the major areas of
responsibilities that they will
be expected to perform and
will be evaluated on.
54
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
Necessary supplies, tools and
equipment for the proper care
and cleaning of the school(s)
are available to staff. Op-
erational staff should be ex-
pected to keep the campuses
8.8* clean. In order for the staff 4 NR NR 6 6 6 8 9 9 10 10 10 10 10 10 Implemented
to meet these expectations,
they must be provided with
the necessary supplies, tools
and equipment, as well as
the training associated with
the proper use of such.
The district has an effec-
tive preventive maintenance
program. The district should
have a written preventive
maintenance program that is
8.9* scheduled and followed by 5 NR 5 5 5 6 7 8 9 10 10 10 10 10 10 Implemented
the maintenance staff. This
program should include veri-
fication of the completion of
work by the supervisor of the
maintenance staff.
The governing board shall
8.10* keep the school buildings in 2 NR NR 6 6 7 8 9 9 10 10 10 10 10 10 Implemented
repair and supervised.
Toilet facilities are adequate
8.11 and maintained. All buildings 0 5 NR NR 6 NR NR NR NR NR NR NR NR NR NR July 2003
and grounds are maintained.
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
55
NR
not
reviewed
The district has implemented
a planned program main-
tenance system. The dis-
trict should have a written
planned program mainte-
nance system that includes
an inventory of all facilities
and equipment that will
8.12* 0 2 NR 5 5 6 7 8 8 8 9 9 10 10 10 Implemented
require maintenance and
replacement. This program
should include purchase pric-
es, anticipated life expectan-
cies, anticipated replacement
timelines and budgetary
resources necessary to main-
tain the facilities.
The CUSD has developed a
9.1 plan for attractively land- 2 NR NR 5 NR NR NR NR NR NR NR NR NR NR NR June 2001
scaped facilities.
The goals and objectives of
the technology plan should
be clearly defined. The plan
should include both the
administrative and instruc-
9.2 4 NR NR NR 6 NR NR NR NR NR NR NR NR NR NR June 2002
tional technology systems.
There should be a summary of
the costs of each objective
and a financing plan should
be in place.
56
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
The governing board shall
provide a warm, healthful
9.3* place in which children who 3 NR NR 4 4 4 6 7 8 8 9 9 9 10 10 Implemented
bring their own lunches to
school may eat their lunch.
The governing board of every
school district shall provide
9.4* 4 NR NR 5 6 6 8 8 9 10 10 10 10 10 10 Implemented
clean and operable flush toi-
lets for the use of pupils.
The CUSD has plans for the
provision of extended day
9.5 7 NR NR NR 8 NR NR NR NR NR NR NR NR NR NR Implemented
programs within its respec-
tive school sites.
The CUSD has developed and
maintains a plan to ensure
9.6 equality and equity of its 0 NR 2 4 5 NR NR NR 8 NR NR NR NR NR NR Implemented
facilities throughout the
district.
All schools shall have ad-
9.7* equate heating and ventila- 0 2 2 4 5 6 7 8 9 9 10 10 10 10 10 Implemented
tion.
All schools shall have ad-
9.8* equate lighting and electrical 0 NR 2 4 6 6 7 8 9 10 10 10 10 10 10 Implemented
service.
Classrooms are free of noise
9.9 and other barriers to instruc- 8 NR NR NR 8 NR NR NR NR NR NR NR NR NR NR Implemented
tion.
Facilities Management
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
57
NR
not
reviewed
The learning environments
provided within respective
9.10* school sites within the CUSD 0 NR NR 4 4 5 6 7 8 9 10 10 10 10 NR Implemented
are conducive to high quality
teaching and learning.
Facilities within CUSD reflect
the standards and expecta-
9.11* 0 NR 2 4 4 5 7 8 9 9 10 10 10 10 10 Implemented
tions established by the
community.
The district should have a
10.1 plan to promote community 8 NR NR 8 9 10 10 10 10 10 10 10 10 10 10 Implemented
involvement in schools.
Education Code Section
38130 establishes terms and
conditions of school facility
use by community organiza-
tions, in the process requir-
10.2 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
ing establishment of both
direct cost and fair market
rental rates, specifying what
groups have which priorities
and fee schedules.
Districts should maintain
comprehensive records and
10.3 controls on civic center 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
implementation and cash
management.
58
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb.
Time line/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
per
consent
decree
*
must
reach
score
of
8
Facilities
Management
NR
not
reviewed
Facilities Management
The district’s public informa-
tion office should coordinate
a full apprisal to students,
11.1 8 NR NR NR 9 NR NR 10 NR NR NR NR NR NR NR Implemented
staff and community of the
condition of the district’s
facilities.
The district should apprise
students, staff and commu-
11.2 9 NR NR 7 7 7 8 8 8 9 9 9 10 10 10 Implemented
nity of efforts to rectify any
substandard conditions.
The district should provide
clear and comprehensive
11.3 6 NR NR NR 7 NR NR NR 8 NR NR NR NR NR NR Implemented
communication to staff of its
standards and plans.
All stakeholder groups should
be directly involved in a
11.4 meaningful manner regarding 10 NR NR NR NR NR NR NR NR NR NR NR NR NR NR Implemented
the district’s facilities and
their operation.