FCMAT
Comprehensive Follow-Up Review
Read the report at Compton Community College District ↗
Compton Community College District
Comprehensive Assessment
Tenth Progress Report
August 2016
Table of Contents
Introduction and Executive Summary
ACCJC Standard III: Resources
Standard III-B: Physical Resources
Standard III-C: Technology Resources
Standard III-D: Financial Resources
ACCJC Standard IV: Leadership and Governance
Standard IV-A: Decision-Making Roles and Processes
Standard IV-B: Board and Administrative Organizations
Introduction
This tenth progress report for the Compton Community College District (Compton CCD) provides
the latest in a series of periodic assessments conducted by the Fiscal Crisis and Management Assis-
tance Team (FCMAT) of the district’s progress in implementing the recommendations made in the
initial Compton CCD Comprehensive Review conducted by FCMAT in April 2007.
Background
On June 30, 2006, Assembly Bill (AB) 318 provided a state loan (line of credit) of $30 million to the
Compton CCD and mandated that FCMAT conduct a compre-
hensive assessment of the district in five operational areas and
“... the ACCJC accreditation
develop a recovery plan for the district. The five operational
process is separate and distinct
areas are Academic Achievement, Community Relations/
Governance, Facilities Management, Financial Management, from the legislatively mandated
and Personnel Management. FCMAT standards for the five requirements of AB 318 and
operational areas have been associated with similar Accredit-
assessment by FCMAT.”
ing Commission for Community and Junior Colleges (ACCJC)
accreditation standards to assist the district with recovery and
regaining accreditation. However, the ACCJC accreditation
process is separate and distinct from the legislatively mandated requirements of AB 318 and assess-
ment by FCMAT.
FCMAT is required to file written status reports on the district’s progress in implementing the
recovery plan. The bill authorizes the Board of Governors of the California Community Colleges to
suspend the authority of the Board of Trustees of the Compton Community College District for up to
five years, plus a period lasting until the Chancellor, FCMAT, Director of Finance and the Governor
concur with the special trustee that the district has sustained the progress and requirements of the
assessment and recovery plan for two consecutive academic years, as provided in Education Code
Sections 41329.59 and 71093.
In a letter dated July 21, 2006, the ACCJC notified the Compton CCD that the accreditation of Comp-
ton Community College would terminate on August 22, 2006. The letter also required the Compton
CCD to notify its students that the college’s accreditation had been revoked. Under the authority of
AB 318 and Education Code Section 74292 (d), the Compton CCD identified a partner district, the
El Camino Community College District (El Camino CCD) that agreed to provide accredited instruc-
tional programs to students at the Compton Center. Under this partnership, instructional services are
provided on the Compton CCD site through El Camino and its Center known as the El Camino Col-
lege Compton Community Educational Center (Compton Center) primarily to residents of Compton,
Carson, Lynwood, Paramount, and parts of north Long Beach.
A Memorandum of Understanding (MOU) signed in August 2006 and updated in July 2008 and May
2013 as an “Agreement Between the El Camino Community College District and the Compton Com-
munity College District” outlines the agreement between the districts, and continues to be a rede-
fined working document. As of July 1, 2015, the Compton Center includes operations under the direct
management of El Camino CCD through the provost/chief executive officer (provost/CEO) at the
Compton Center site. The provost/CEO reports to the superintendent/president of El Camino CCD
for the operational aspects of the Compton Center, including its instructional programs and student
services. Business services, facilities, personnel, governance components and other programs and
Compton Community College District 1
services are managed by the Compton CCD’s provost/CEO, who reports to the state special trustee
for the Compton CCD for these operational areas.
A formal Senior Management Group was established and is composed of the El Camino CCD superin-
tendent/president, state special trustee, El Camino CCD vice presidents and the Compton CCD provost/
CEO. The management group is chaired by the provost/CEO. The goals and objectives of the Senior
Management Group are to monitor and assist the Compton Center and the Compton CCD in meeting
ACCJC eligibility requirements, standards and commission policies.
The provisions of AB 318 and the subsequent revocation of the Compton Community College’s
accreditation are unprecedented and have necessitated an extremely complex governance and orga-
nizational structure to allow the partnering district to offer accredited courses. Compton Commu-
nity College is the first California public community college to lose its accreditation, have a special
trustee appointed to administer the college district, have the authority of its elected governing board
suspended by legislation, and receive a multimillion-dollar state loan to continue operations. The
transition of instructional procedures and systems has been challenging, including establishing the
proper reporting relationships, lines of communication, and the appropriate names and references for
the Compton Center, operating under the auspices of the El Camino CCD.
As the Compton CCD continues to address the operational deficiencies that led to the suspension of
local governance and the revocation of accreditation, FCMAT’s work with the district and the Comp-
ton Center is intended to assist the district in improving its basic operations and preparing for an
eventual return to local governance.
FCMAT has developed a set of legal and professional standards to provide a standards-based assess-
ment process for these reviews and has endeavored to associate these standards with similar stan-
dards of the ACCJC. This standards-based process and a rubric to rate the standards are explained in
the following sections of this report.
Use of FCMAT Professional and Legal Standards
Since 1993 the Fiscal Crisis and Management Assistance Team (FCMAT) has been engaged in
assisting California K-12 school districts under state administration to return to local governance.
FCMAT developed a standards-based assessment tool as part of this work, and has adapted it for use
in assessing and monitoring the Compton CCD. FCMAT professional and legal standards are being
used to help the Compton CCD maintain fiscal solvency, improve operations and move toward recov-
ery in each operational area.
For each ACCJC standard, appropriate FCMAT standards from the operational areas of Community
Relations/Governance, Academic Achievement, Personnel Management, Financial Management
and Facilities Management have been used to measure district progress. However, the ACCJC will
conduct its own independent review to determine when accreditation will be restored to the Compton
Center.
Each professional and legal standard has been scored, on a scale of 0 to 10, as to the Compton CCD’s
implementation of the standard at this point in time. These ratings provide a basis for measuring the
district’s progress in subsequent reporting periods.
2 Fiscal Crisis and Management Assistance Team
The following represents a definition of terms and scaled scores. The single purpose of the scaled
score is to establish the baseline of information by which the district’s future gains and achievements
in each of the standards can be measured over time.
Not Implemented (Scaled Score of 0)
There is no significant evidence that the standard is implemented.
Partially Implemented (Scaled Score of 1 through 7)
A partially implemented standard lacks completeness, and it is met in a limited degree. The degree of
completeness varies as defined:
1. Some design or research regarding the standard is in place that supports preliminary
development. (Scaled Score of 1)
2. Implementation of the standard is well into the development stage. Appropriate staff is
engaged and there is a plan for implementation. (Scaled Score of 2)
3. A plan to address the standard is fully developed, and the standard is in the beginning
phase of implementation. (Scaled Score of 3)
4. Staff is engaged in the implementation of most elements of the standard. (Scaled
Score of 4)
5. Staff is engaged in the implementation of the standard. All standard elements are
developed and are in the implementation phase. (Scaled Score of 5)
6. Elements of the standard are implemented, monitored and becoming systematic.
(Scaled Score of 6)
7. All elements of the standard are fully implemented, are being monitored, and appro-
priate adjustments are taking place. (Scaled Score of 7)
Fully Implemented (Scaled Score of 8-10)
A fully implemented standard is complete relative to the following criteria:
8. All elements of the standard are fully and substantially implemented and are sustain-
able. (Scaled Score of 8)
9. All elements of the standard are fully and substantially implemented and have been
sustained for a full school year. (Scaled Score of 9)
10. All elements of the standard are fully implemented, are being sustained with high
quality, are being refined, and have a process for ongoing evaluation. (Scaled Score of
10)
Compton Community College District 3
Study Team
The FCMAT team and partners for this tenth progress review included the following agencies and
individuals.
Administration and Report Writing – Fiscal Crisis and Management Assistance Team
• Diane Branham, Chief Management Analyst
• Laura Haywood, Technical Writer
Academic Achievement – no longer reviewed by FCMAT or included in the progress report
Personnel Management – no longer reviewed by FCMAT or included in the progress report
Facilities Management – Fiscal Crisis and Management Assistance Team
• Eric D. Smith, Fiscal Intervention Specialist
• Brad Pawlowski, Director of Support Services, Sanger USD*
Financial Management – Fiscal Crisis and Management Assistance Team
• Marisa Ploog, CPA, CFE, CGMA, CICA, Fiscal Intervention Specialist
• Michelle Giacomini, Chief Management Analyst
• Andrea Dodson, Management Analyst
• Scott Sexsmith, Management Analyst
• Debbie Martin, CPA, Internal Auditor, Kern CCD*
Community Relations and Governance – Collaborative Brain Trust
• Shirley Kelly, Retired Community College President
• Peggy Moore, Retired Community College Vice President of Instruction
*As a member of this study team, this consultant was not representing his or her respective employer
but was working solely as an independent contractor for FCMAT.
4 Fiscal Crisis and Management Assistance Team
Executive Summary
Summary of Progress
As demonstrated in this tenth progress report, improvement has been noted and the average ratings
of the standards in the operational areas of Facilities Management, Financial Management and Com-
munity Relations/Governance of the Compton CCD have increased during this reporting period.
The partnership between the Compton CCD and the El Camino CCD continues to evolve under the
leadership of the state special trustee, provost/CEO and El Camino College executive management
team. Specific organizational roles and responsibilities of the governing entities and administrators
continue to evolve and be clarified as they apply to the Compton CCD and the Compton Center. Re-
porting relationships are clearly communicated for all faculty, staff and students to navigate properly.
From a governance perspective, the special trustee provides decision-making authority in lieu of
the Compton CCD elected governing board and personnel commission. The provost/CEO of the
Compton CCD reports directly to the state special trustee and the superintendent/president of the El
Camino CCD. This organizational structure is reflected in the CCCD/ECCD CEC 2015-2016 Organi-
zational Structure, dated February 11, 2016. Compton CCD has required active leadership from both
the special trustee and the provost/CEO to assist the district in developing and sustaining the internal
capacity required to eventually return the district to local governance and regain the college’s ac-
creditation.
The state special trustee, provost/CEO and El Camino CCD executive management team have initi-
ated planning strategies, implemented needed improvements, and brought organizational balance to
the unique reporting structure of the governance partners. Provisions of the MOU and subsequent
Agreement between the parties continue to ensure that the El Camino CCD Board of Trustees is
engaged in issues of policy affecting students at the Compton Center.
The state special trustee, the provost/CEO and the chief business officer (CBO) have remained with
the Compton CCD during this review period, which has continued to provide much-needed con-
sistent, strong leadership to the district. The CBO and the director of accounting have continued
to evaluate business office functions, develop and implement written processes and procedures for
the Business Services Department, and increase internal controls. This has helped to improve fiscal
practices and increase ratings in several of the Financial Management standards.
The director of facilities planning and operations has also remained with the district during this re-
view period. Continuity and experience in this key leadership position has contributed to the contin-
ued improvement in facilities, maintenance and operations practices and progress in several Facilities
Management standards.
The elected board serves in an advisory capacity and has continued to make progress in developing
functional working relationships with each other, the special trustee, administration and staff. The
general tenor of board meetings has also continued to improve. These improved practices have con-
tributed significantly to the increased ratings in numerous Community Relations/Governance stan-
dards, and need to continue for the board to demonstrate its readiness to assume a decision-making
role.
The recovery process for the Compton CCD and Compton Center required significant improvement,
which has occurred incrementally over time. The partnership between the Compton CCD and the El
Compton Community College District 5
Camino CCD remains strong, and the entities continue to navigate through this unique and complex
circumstance.
The Compton CCD, with the assistance of its partner, the El Camino CCD, and the special trustee
has continued to make the progress necessary for a return to local governance.
Although responding to the FCMAT standards provides the basis of a review of district activities,
it does not yield an accreditation self-study. The ACCJC has many standards not covered by the
FCMAT review. Furthermore, the requirement for documentation to support the description of activi-
ties is very different. While the activities undertaken as part of the FCMAT review will be useful to
the institution, the ACCJC has a distinct and separate process from FCMAT relative to accreditation.
Return to Local Governance
Assembly Bill 318 amended Education Code Section 71093 to allow the Board of Governors to au-
thorize the chancellor to suspend the authority of the Compton Community College District Board
of Trustees to exercise any powers or responsibilities or take any official actions with respect to the
district’s management. Suspension may be authorized for a period up to five years from the effective
date of AB 318 of the 2005-06 regular session, plus a period lasting until the Chancellor, FCMAT,
the Director of Finance, and the Governor concur with the special trustee that the district has, for two
consecutive academic years, met the requirements of the comprehensive assessment and recovery
plan.
The initial Compton Community College District Comprehensive Review, April 2007 assessed the
Compton CCD using 335 professional and legal standards in five areas of district operations. The
standards were aligned to the four standards of the ACCJC to develop specific recommendations for
operational improvements that would help prepare the district to return to fiscal solvency and local
governance and enhance its readiness to re-establish accreditation. Scaled scores were assigned for
each standard to provide a baseline measure of the district’s implementation of the standards as of
fall 2006. Each standard was measured and a scaled score from zero (not met) to 10 (fully met) was
applied.
To focus the district’s efforts on recovery, FCMAT selected a subset of these 335 standards in con-
sultation with the appointed special trustee. The 183 standards were selected as having the highest
probability, if addressed successfully, to assist the Compton CCD with recovery. These standards
are identified in bold print in the Tables of Standards in each operational area section of this report.
They were the focus of this visit and assessment. An average of the scores for the subset of standards
in each of the operational areas was determined and became the baseline of data against which the
district’s progress was measured over time, during each review and assessment.
The district is not required to reach a scaled score of 10 in each of the selected standards, but is
expected to make steady progress that can be reasonably sustained. It is reasonable to expect that the
district can reach an average rating of at least a six, with no individual standard scored less than a
four, in the subset of FCMAT standards identified under ACCJC standards I, II and IV, and ACCJC
standards III-A, III-B, and III-C/D. ACCJC Standard III, which deals with how the district manages
its resources, has been subdivided into three sections, to provide an average for the operational areas
of human resource (personnel) management, physical resource (facilities) management and financial
resource management.
6 Fiscal Crisis and Management Assistance Team
When the average score of the subset of standards within an ACCJC standard or standard subdivision
reaches a level of six, progress is considered to be substantial and sustainable, no individual standard
in the subset is below a four, and the district has sustained the standards for two consecutive academ-
ic years, this particular operational area could be considered for return to the local district governing
board, provided that the Community Relations/Governance standards have been substantially met
and are sustainable and that operational area has been returned to the local governing board. It is
conceivable that the Board of Trustees could regain local authority incrementally.
During the sixth and seventh review periods, the Personnel Management and Academic Achievement
operational areas, respectively, reached an average rating of six with no individual standard below a
four, and the district had sustained these ratings for two consecutive academic years. Therefore, these
areas were not reviewed by FCMAT nor included in this tenth progress report.
However, because the required criteria had not been met for the Community Relations/Governance
operational area, governance of Personnel Management and Academic Achievement was not re-
turned to the local Board of Trustees and remained with the special trustee.
During this review period, the Facilities Management, Financial Management and Community Rela-
tions/Governance operational areas have reached an average rating of six with no individual standard
below a four. The district has sustained these ratings for two consecutive academic years. Therefore,
the district has met FCMAT’s required rating standards in all five operational areas of the compre-
hensive assessment and recovery plan, as prescribed in AB 318 and Education Code Section 71093.
The ACCJC will conduct its own assessment to determine the eligibility requirements for accredi-
tation. The ACCJC accreditation process is separate and distinct from the legislatively mandated
requirements of AB 318 and assessment by FCMAT.
Recovery Plan
The Compton Community College District Comprehensive Review, April 2007 assessed the district
using 335 professional and legal standards and provided an in-depth review and a baseline score for
each standard. A subset of FCMAT standards that were similar in nature to the ACCJC’s four broad
topic areas was identified to assist the district in focusing its efforts to more successfully achieve
recovery and a return to local governance. This subset of standards is the focus of this tenth prog-
ress report. Although all professional and legal standards utilized in the comprehensive assessment
process are important to any district’s success, this identified subset of standards enables the district
to focus its efforts on making progress toward recovery.
Following the initial comprehensive review in April 2007, FCMAT, with the collaboration of the
special trustee, identified a subset of 186 FCMAT standards in the four ACCJC standards areas to
be reviewed during each progress review. Three of those standards were eliminated during the third
progress review because they were repetitive of other standards or were not applicable to the college
or district. The subset of FCMAT standards included in this tenth progress report is:
• 27 (now 26) of 37 standards in ACCJC Standard I-A and I-B, Mission and Effectiveness –
no longer reviewed by FCMAT or included in the progress report
• 16 (now 15) of 28 standards in ACCJC Standard II-A, II-B and II-C, Student Learning –
no longer reviewed by FCMAT or included in the progress report
Compton Community College District 7
• 40 of 82 standards in ACCJC Standard III-A, Human Resources – no longer reviewed by
FCMAT or included in the progress report
• 41 (now 40) of 71 standards in ACCJC Standard III-B, Physical Resources
• 41 of 88 standards in ACCJC Standard III-C, Technology, and III-D, Financial Resources
• 21 of 29 standards in ACCJC Standard IV-A and IV-B, Leadership and Governance
The subset of standards is identified in bold print in the Table of Standards displayed in each ACCJC
standard section. Each progress review assesses only the identified subset of standards.
Later sections of this report provide greater detail on each of the standards in the identified subset of
standards. For each standard, a description is provided of the district’s progress in implementing the
standard, and a rating, on a scale of 0-10, is provided of the district’s progress at this point in time.
Summary Table of Progress
An average of the identified subset of FCMAT standards within each ACCJC standard area was
calculated to provide a summary of the district’s progress in that area. The average ratings from the
Compton Community College District Comprehensive Report, April 2007 of the identified subset of
standards provided a baseline of data against which the district’s progress can be measured during
each review.
8 Fiscal Crisis and Management Assistance Team
Compton Community College District 9
gnitaR
egarevA
4
naht
sseL
sdradnatS
fo
.oN
fo
.oN
dradnatS
sdradnatS tesbuS
ni
lirpA
lirpA
lirpA
lirpA
enuJ
yluJ
.naJ
enuJ
yluJ
.naJ
lirpA
lirpA
lirpA
lirpA
lirpA
enuJ
yluJ
.naJ
enuJ
yluJ
.naJ
lirpA
6102
5102
4102
3102
2102
0102
0102
9002
8002
8002
7002
6102
5102
4102
3102
2102
0102
0102
9002
8002
8002
7002
dradnatS
CJCCA
dna ,noissiM
,A-I
**RN
**RN
**RN
18.6
37.6
70.6
47.5
18.4
91.2
69.1
25.1
**RN
**RN
**RN
0
0
0
0
3
52
62
62
*62
lanoitutitsnI
,B-I
ssenevitceffE dradnatS
CJCCA
lanoitcurtsnI
,A-II
,B-II
;smargorP
**RN
**RN
**RN
00.7
37.6
62.6
74.5
04.5
88.2
44.2
57.1
**RN
**RN
**RN
0
0
0
0
0
11
21
41
*51
troppuS
tnedutS
,C-II dna
,secivreS
gninraeL
dna yrarbiL
secivreS
troppuS
dradnatS
CJCCA
**RN
**RN
**RN
**RN
81.8
06.7
00.7
35.5
59.3
38.2
53.1
**RN
**RN
**RN
**RN
0
0
0
6
02
82
63
04
namuH
,A-III secruoseR
dradnatS
CJCCA
08.8
55.8
02.8
09.6
09.6
32.7
39.6
31.6
67.2
43.2
23.2
0
0
0
1
2
0
0
2
52
82
82
*04
lacisyhP
,B-III secruoseR
dradnatS
CJCCA
,ygolonhceT
,C-III
02.7
38.6
64.6
39.5
20.5
08.6
22.6
36.4
38.2
93.2
87.1
0
0
0
2
21
0
0
8
62
23
53
14
,D-III dna
secruoseR
laicnaniF
-VI
dradnatS
CJCCA
gnikaM-noisiceD
,A
,sessecorP
dna seloR
25.8
26.7
91.6
17.5
84.5
16.6
01.7
33.5
17.2
41.2
01.2
0
0
0
6
6
0
0
1
71
71
71
12
draoB
,B-VI dna
evitartsinimdA
dna
snoitazinagrO
.tcirtsid
ro/dna
egelloc
eht
ot
ytilibacilppani
ro
ycnadnuder
fo
esuaceb
detanimile
dradnats
enO
*
deweiveR
toN
= RN
**
naht
ssel
detar
dradnats
laudividni
on
htiw
,xis
a
sehcaer
aera
lanoitarepo
na
ni
sdradnats
TAMCF
fo
tesbus
eht
fo
gnitar
egareva
eht
nehW
ni
ti
edulcni
ro
aera
eht
weiver
regnol
on
lliw
TAMCF
,sraey
cimedaca
evitucesnoc
owt
rof
sgnitar
eseht
deniatsus
sah
tcirtsid
eht
dna
,ruof
a
.stroper
ssergorp
erutuf
Overview of Operational Areas of Management
Assembly Bill 318 required FCMAT to conduct a comprehensive assessment of the Compton Com-
munity College District (Compton CCD) and prepare a recovery plan addressing the five operational
areas that include Academic Achievement, Personnel Management, Facilities Management, Financial
Management, and Community Relations/Governance. FCMAT aligned the legal and professional
standards used to assess these five operational areas with the four standards of the Accrediting Com-
mission for Community and Junior Colleges (ACCJC) to assist the district in its recovery. Because
the Personnel Management and Academic Achievement operational areas reached an average rating
of six with no individual standard below a four and the district had sustained these ratings for two
consecutive academic years during prior review periods, these areas were not reviewed by FCMAT
nor included in this tenth progress report.
Each of the identified subset of standards is presented in greater detail in later sections of this report.
This section, however, provides an overall summary of the Compton CCD’s management of each
operational area.
Facilities Management
Overview
FCMAT reviewed and assessed 40 Facilities Management standards and prepared a comprehensive
assessment based on the findings. These standards have been associated with similar ACCJC ac-
creditation standards relating to Physical Resources (ACCJC Standard III-B) to assist the district with
recovery and regaining accreditation. However, the ACCJC accreditation process is separate and
distinct from the legislatively mandated requirements of AB 318 and assessment by FCMAT.
In June 2013, the district hired a permanent director of facilities planning and operations. This posi-
tion has overall responsibility for facilities, maintenance, custodial, and grounds. The director served
previously as the district’s interim director of facilities planning and operations, and prior to that as
a senior project manager for a construction management firm, and worked with the district in that
capacity for several years.
The district has been proactive and successful in seeking local funds for capital improvements as
evidenced by the passage of Measure CC in November 2002, which authorized the issuance of $100
million in general obligation bonds, and the passage of Measure C for an additional $100 million in
November 2014 at an approval rating of 78%. These bond measures authorized funds to repair and
renovate instructional classrooms and job training facilities, and upgrade security systems, electrical
capacity, computer technology, energy efficiency, and roofing systems.
Compton Community College was originally constructed in the early 1950s and opened for classes in
fall 1953. Since that time more facilities have been added to the campus. The district has embarked on
an aggressive facilities campaign and continues to show significant improvement in this area. Some
examples of facilities projects that have been completed or are in progress include the following:
Music Building Renovation (Y-Area/Little Theater)
The current total project budget is $2.5 million. WLC Architect, the architect of record for this
project, submitted the documents to the Division of the State Architect (DSA) in December 2013.
The bid contract for the project was awarded on March 22, 2016 for $1.679 million. The project
is under construction.
10 Fiscal Crisis and Management Assistance Team
Phase I – Central Plant/Stadium Lighting
The photovoltaic (solar) panels have been installed. The contractor is working on completing
an interconnectivity agreement with Southern California Edison to operate the solar panels. The
final power switch over to the new electrical system for the MIS and M&O buildings was com-
pleted April 6, 2014. The old Central Plant was decommissioned. The new Central Plant chilled
water system provides cooling in the Math/Science, Childcare, and Vocational Technology build-
ings while the building cooling programming continues. The project has been closed out.
Phase I – Utility Infrastructure
Landscaping and irrigation along the main road is complete. Programming for the new lighting
is complete. Connection of domestic water, gas and sewer to the existing buildings is complete.
The project was completed on August 18, 2015.
Retention Basin/Practice Field
The retention basin is complete, and the contractor installed irrigation and hydroseeded the area.
The project was completed in January 2015.
Phase II – Utility Infrastructure
Landscaping and irrigation along the main road, installation of fence panels in the northeast cor-
ner near the Greenleaf entrance and connection of domestic water, gas and sewer to the existing
buildings is complete. The project was completed on August 18, 2015.
Allied Health Building
The California Department of Finance gave final approval for this project at the end of February
2014. The preconstruction meeting with the general contractor, AMG, was held March 20, 2014.
A Notice to Proceed was issued to AMG on April 14, 2014. The project was completed in March
2016.
Compton CCD has created and maintains a facilities project priority list and continues to prog-
ress with a list of projects meeting these criteria. This list is revisited annually and is to be updated
monthly through communication and prioritization between the provost/CEO, CBO, director of
facilities planning and operations and other key members of cabinet.
Safety measures continue to improve, including campus security and employee safety. The Work-
place Security Plan includes a communications system that is designed to encourage continuous flow
of safety, health, and security information between management and employees. The plan states the
district will perform periodic inspections designed to identify hazards, provide for freedom of move-
ment and access, and ensure emergency contact information is current and posted. The plan is on file
at both the facilities and planning and the police departments and is available for inspection by any
users accessing the site. The plan includes a complete site map showing evacuation routes.
The district updated the Consolidated Contingency Plan in May 2015. The plan identifies contact
information including response and medical treatment facilities in case of an emergency. The plan
includes procedures for prevention, mitigation, and abatement of hazards, and lists emergency equip-
ment that is to be available. An employee training plan is also included and contains methods for safe
handling of hazardous chemicals, procedures in the event of a release, use of emergency responder
equipment and procedures for coordinating with other local agencies.
Compton Community College District 11
The district’s Facilities Master Plan includes an assessment of the condition of all buildings. The plan
includes components for energy efficiency, mechanical, electrical and fire alarm systems, site utilities,
technology, security and campus lighting. The Facilities Master Plan is a blueprint for the district to
follow regarding new construction and maintenance requirements. The district has decided to temporar-
ily postpone updating the Facilities Master Plan until the new Educational Master Plan is completed.
The Educational Master Plan will drive the revision of the district’s Technology and Facilities Master
plans.
Financial Management
Overview
FCMAT reviewed and assessed 41 Financial Management standards and prepared a comprehensive
assessment based on the findings. These standards have been associated with similar ACCJC accred-
itation standards relating to Technology and Financial Resources (ACCJC Standard III-C and III-D)
to assist the district with recovery and regaining accreditation. However, the ACCJC accreditation
process is separate and distinct from the legislatively mandated requirements of AB 318 and assess-
ment by FCMAT.
The district continues to retain a strong leadership team that contributes to the improvement in the
Financial Management standard ratings and influences the fiscal health of the district. Interviews,
observations during fieldwork, and the review of supporting documentation show that the district has
continued to make improvement and sustained or advanced its progress in all standards.
The district has established a solid leadership foundation, and the lines of authority and chain of
command are clearly established and are recognized by staff. Staff continue to report that they clear-
ly understand the administration’s expectations of them. Management-level personnel are actively
involved in directing and overseeing the work of staff in the Business Services Department, although
some improvement is needed in overseeing payroll functions.
The Business Services Department has continued to establish routine practices in most areas and has
sustained a strong, consistent leadership team, which strengthens its ability to provide high quality
services and make ongoing progress in recovery. Continued stability in this area will be essential
to further strengthen operational procedures and continue to make sustainable progress in all areas
managed by the Business Services Department.
The working relationships between Compton CCD and El Camino CCD continue to be positive as a
result of the consistency and strength of the current leadership team. Senior management, including
the new superintendent/president of El Camino CCD, continue to report high levels of confidence in
the Compton CCD leadership team.
Internal Control Environment, Fraud Detection and Internal Audit
It remains a district priority to ensure that sound internal controls are established, reviewed, and
monitored to deter and prevent material misstatements. The provost/CEO remains committed to es-
tablishing an environment and culture that clearly communicates that fraud and other illegal acts will
not be tolerated and that all allegations will be investigated. During this review period, the district
formed an Audit Committee independent of the business office that is to periodically report to the
board/special trustee the status of district financial, special and internal audit recommendations. The
district also engaged an independent certified public accountant/certified fraud examiner to review
the operational procedures of the Bursar’s Office and payroll services. The results of these two re-
ports were scheduled to be reviewed by the Audit Committee.
12 Fiscal Crisis and Management Assistance Team
The establishment of the Audit Committee helps to offset the loss of objectivity and neutrality created
as a result of the lack of an internal auditor position. The Audit Committee is to monitor the control
structure and act as liaison between management and the internal audit function, and reports directly
to the provost/CEO to maximize the effectiveness of the control structure.
The district continues to maintain a fraud prevention program, following Administrative Regulation
7701, Whistleblower Reporting Protocols. The regulation outlines the CEO’s procedures if unlawful
incidents are suspected of district employees in the performance of their duties. This regulation es-
tablishes processes for responding to and investigating reports of unlawful activities, as defined in Board
Policy 7700, Whistleblower Protection. The policy also addresses how complaints of retaliation for
making such reports are to be handled. A fraud hot line, which allows anonymous tips about potential
fraud, also continues to be part of the fraud prevention program.
Budget Development and Financial Accounting and Reporting
The district continues to follow a structured budget development process based on a calendar of
events and deadlines. The CBO is responsible for overseeing budget development and the result-
ing budget and is assisted by a budget analyst and one accountant responsible for categorical funds.
Additional business office staff, such as the director of accounting and/or the accounting supervi-
sor positions, should be cross trained in the budget process. In addition, the district should consider
involving more staff members in budgeting, particularly with the projection of expenditures and the
inclusion of expenditure plans.
The district has policies and procedures in place to facilitate budget development and alignment of
resources with district goals and objectives. The district continues to use the TracDat software to as-
sist deans and individual departments in developing their budgets. Using this application, faculty and
staff are guided through a process that correlates the overarching district goals, unit and area plans,
and budget augmentations.
The Planning and Budget Committee continued to meet regularly throughout the year and was
provided information regarding the budget assumptions and projections. Discussion topics included
the district’s 2015-2016 Planning and Budget Calendar, overarching priorities, budget, five-year fiscal
management plan, and financial obligations associated with other postemployment benefits (OPEB),
the California Public Employees’ Retirement System (CalPERS) and the California State Teachers’
Retirement System (CalSTRS).
Quarterly financial statements are presented to the board/special trustee but continue to lack detailed
explanations for large variances that occur in revenues, other financing sources, expenditures, other
outgo and cash borrowing. The district should provide a narrative to explain the variances between
reporting periods.
The district reconciled its two financial accounting and reporting software systems, Datatel and
PeopleSoft, at the end of the 2012-13 fiscal year. However, due to the difficulties encountered in
the timing of uploads into Datatel and the extensive time necessary to perform the reconciliations
monthly, reconciliations are only completed quarterly. The district should routinely reconcile the two
systems throughout the year to ensure that transactions are accurate and recorded timely.
Enrollment and Attendance
The district has an established process for recording and reporting enrollment and attendance; how-
ever, FCMAT’s concern continues from prior review periods regarding the accuracy of some reports
prepared and submitted to the state. The data reported in the Enrollment Fee Revenue reports is cu-
Compton Community College District 13
mulative; therefore, totals should increase from one reporting period to the next, but those reviewed
by FCMAT continue to show a decline in fees paid from one period to the next. The procedures for
completing the report should be reviewed to ensure that reports are completed properly.
To meet the district’s goal of 6,060 full-time equivalent students (FTES), the FTES Goal and Actual
report shows that 749 FTES will be used from summer 2015 and 350 FTES will be borrowed from
summer 2016 to use in fiscal year 2015-16. Although the use of summer FTES in either fiscal year
is a standard practice used by California community colleges, it should be done cautiously because
summer FTES may eventually be exhausted by use in the prior fiscal year if borrowing occurs for
several successive fiscal years. The administrative team reported that it has established a priority
focused on student enrollment with the goal of mitigating and/or eliminating the need for borrowing.
Associated Student Body
The district has established a board policy and administrative regulation pertaining to ASB; however,
adherence to the policy and regulation continues to be lacking in some areas. For example, evidence
was not provided indicating that a list of all auxiliary organizations in good standing was given to
the board/special trustee or that the reviews of auxiliary organization procedures and practices had
been conducted. The district should ensure that its board policies and administrative regulations are
being followed and revise policies and regulations if they are no longer current.
The district has developed an Associated Student Body Finance Code and Procedures Manual with
written guidance on various operational procedures and best practices. The district is actively re-
viewing and updating the manual based on actual practice and/or to increase oversight and guidance.
During this review period, FCMAT observed fewer inconsistencies in practice, and greater compli-
ance with established procedures relative to the completion of journal entries, financial statements
and bank reconciliations with management’s oversight. FCMAT did observe inconsistencies related
to the district’s Finance Code and Procedures Manual regarding procedures for addressing inactive
clubs. While the district’s manual states that any remaining balances of a club that becomes inactive
are to be transferred to the general (ASB) fund following a one-year claim period, the district’s list of
ASB clubs shows that a significant number of clubs have been inactive for a year or more and retain
balances. Interviews with district staff and ASB representatives indicated they are aware of this and
are actively working on rectifying the matter. The district office should play a more active role in
oversight of these activities, including review and transfer of inactive club balances.
Maintenance, Operations and Facilities
Stability in the leadership of the Maintenance and Operations Department has continued; however,
the department struggles with staffing issues of absenteeism, leaves and disciplinary actions. The
ongoing and new modernization projects continue to be a significant focus for the director of facili-
ties planning and operations, while managing day-to-day operations of the department. The depart-
ment continues to share a work order system with the El Camino CCD, which has been economically
advantageous. However, the shared system creates limitations in the district’s ability to maximize the
benefits that exist with an independent system. Therefore, the system is only used to track work order
requests and staff assignments by trade.
The Maintenance and Operations Department continues to have limited controls in place to track
small tools and equipment. Since the last review the department has suspended the process of check-
ing tools in and out of locked storage bins due to limitations in staffing. The department does not
maintain an up-to-date list of tools and equipment nor does it conduct routine physical inventories to
ensure all items are accounted for.
14 Fiscal Crisis and Management Assistance Team
Board policy, administrative regulations and procedures regarding the use of facilities have been
established, and the district recently updated the policy and regulations. However, at the time of FC-
MAT’s fieldwork the district had not yet implemented the newly adopted policy and regulations nor
had the changes been reviewed with staff members responsible for processing facility use permits.
Technology
The district continues its efforts to revise its technology plan. The current technology plan was pre-
pared for the period 2011 through 2016 and was focused on rebuilding the infrastructure, which was
extremely frail and vulnerable to failure.
The new technology plan that is to be influenced by the new Educational Master Plan should include:
all identified critical limitations, what is needed to incorporate and support advancing technologies,
and cost estimates and funding sources. Under the leadership of the dean of student learning and the
director of information technology, development of the plan should be collaborative and incorporate
representation from all specialties.
Considerable change in end user devices and applications has occurred since development of the
2011-16 technology plan, and the district faces ongoing changes in user needs. Updating and man-
aging equipment, applications and support has become a new focus and priority. There has been a
considerable upgrade of lab and staff computers over the past year. A major upgrade to the network-
ing infrastructure was also completed that replaced old networking components such as routers and
switches. Approximately 200 wireless access points were installed and provide nearly campuswide
coverage.
Community Relations and Governance
Overview
FCMAT reviewed and assessed 21 Community Relations/Governance standards and prepared a
comprehensive assessment based on the findings. These standards have been associated with similar
ACCJC accreditation standards relating to Leadership and Governance (ACCJC Standard IV) to as-
sist the district with recovery and regaining accreditation. However, the ACCJC accreditation process
is separate and distinct from the legislatively mandated requirements of AB 318 and assessment by
FCMAT.
The last Compton CCD trustee election took place in November 2013. Due to redistricting all five
seats were open; two incumbents were re-elected to the board, and three new members were elected.
Pursuant to AB 318, the elected board is not authorized to perform the functions of a community
college board and serves in an advisory capacity to the state appointed special trustee. Beginning
in July 2014, the board members were seated at the dais for all meetings. Interviews with individual
board members indicated that this change resulted in a more engaged and positive board. In July
2015, the role of the board members was expanded to allow them to attend closed sessions, make
and second motions, and vote on agenda items at board meetings. This has been an important step in
preparation for the return of rights, duties, and power to the Board of Trustees. All the members in-
dicated that the tone of meetings is collegial. It is essential that the members continue to exhibit this
preparation, decorum, and professionalism that will demonstrate their readiness to assume a full role
when the district regains local authority to govern areas of operations.
Although the FCMAT standards do not explicitly address the unique nature of the partnership and
Agreement Between the El Camino CCD and Compton CCD or the path to accreditation for the
Compton Community College District 15
center, the board must understand and demonstrate public support for the agreement and the ac-
creditation plan. The board members must continue to develop a cooperative working relationship
with each other and with the special trustee and administrative staff to continue improvement in the
governance component.
Communications
External communication for the Compton Center is formally handled through the El Camino CCD
director of community relations. Communications are handled in a variety of ways that include the
district website and community meetings conducted by the provost/CEO and vice president. The pro-
vost/CEO continues to be committed to communicating information about the district, the campus
facilities, the budget and the progress of initiatives. District information is regularly provided to the
board. However, the review team did not find a formal plan for either external or internal communi-
cation.
The Consultative Council also provides a forum for the exchange and discussion of information.
However, the meeting minutes for this review period did not include sufficient detail on the topics
under discussion. Because this is the primary shared governance group at the Compton Center, and
two key committees (Planning and Budget and Institutional Effectiveness) report to the council, the
minutes should be more detailed so that interested parties know what transpires.
During previous reviews, individuals at all levels of the organization indicated that feedback to con-
stituencies needed improvement. During this review, many individuals stated that it is the responsi-
bility of the members of the various committees and councils to ensure they represent their constitu-
ents and report back to them about discussions and decisions. They indicated that closing the com-
munication loop is important so that people realize how their ideas are used in decision-making. This
improvement in the feedback provided to constituent groups is likely responsible for the improved
perception of the effectiveness of the shared governance process.
Community Relations
Complaints received by the board are referred to the provost/CEO for resolution, and board members
are aware of their role regarding informal public concerns. It is important for the board to continue
this practice and not to speak or appear to be speaking for the entire board unless authorized to do
so.
Community Collaboratives and District Committees
The outreach strategy for the Compton Center has been formalized in the Enrollment Management
Plan and implementation is well under way. The district has supported the implementation by pro-
viding staffing and funding for the plan’s activities. The Enrollment Management Plan places an
emphasis on retention of students. The provost/CEO has continued to make a priority of developing
relationships in the community.
Within the district, the Consultative Council and its committees provide the opportunity for indi-
viduals to provide advice and counsel. The district needs to continue its examination of committees
and their functions and should ensure that constituency members of the Consultative Council and
committees continue to report information to their respective groups so that staff and students are
informed.
During a prior review period all segments of the campus community, including students, classified
staff, faculty, and managers, indicated that at times senior management seemed to listen but not hear
16 Fiscal Crisis and Management Assistance Team
what was shared. This situation has continued to improve, and individuals reported that they feel
their contributions are taken seriously and that senior management is listening and hearing.
Board Roles/Boardsmanship
The Compton CCD has a full board serving in an advisory capacity with three new members as of
the November 2013 election. The district has developed a specific training agenda for board mem-
bers that addresses the areas of expectations, roles and responsibilities, and provides a framework
for operations at board meetings. The team found general agreement about the importance of board
training. This training should enable the board to assume its full role when the college/district again
becomes an independent entity. The board should continue its commitment to training and should
continue to work to fully understand the appropriate role and conduct of a board member at meetings
and when dealing with the public and staff.
The board is informed on issues of importance. Staff members regularly provide reports, the provost/
CEO and special trustee meet with board members to review operational issues, and the provost/
CEO provides background information and data in advance of public meetings.
The board has made significant progress and must continue to work as a unified whole, show respect
for one another and support the decisions of the majority. The board has developed positive working
relationships with the special trustee and administration and treats them with respect.
Board Meetings
The 2015-16 board agendas and regular meeting minutes were posted to the district’s website; how-
ever, minutes were not posted for three special board meetings and had not been presented to the
board/special trustee for approval. All board meeting minutes should be presented for approval at
the subsequent regular board meeting. In past review periods, board meeting agendas were posted in
the Administration Building for both campus and public information; however, during fieldwork for
this review period, the board meeting agenda was not posted timely. The district should ensure that
it complies with Government Code Section 54954.2 regarding the posting of board meeting agendas.
Members of the public have an opportunity to address both agenda and non-agenda items during
board meetings.
Beginning in July 2014, the elected board members have been seated at the dais for all board meet-
ings, and beginning in July 2015 they make and second motions, vote on agenda items, and attend
closed session. Interviews indicated that the board is working hard to understand the issues and work
together rather than as five individuals. Board members will also need to ensure that they deal with
controversial and complex issues in a cooperative manner.
The review team attended the March 22, 2016 Board of Trustees meeting. Board members acted in
a professional manner at this meeting. The board meeting was conducted in a cordial and respect-
ful manner, and members were clearly prepared to engage in meaningful discussion. Interviews and
review of the 2015-16 board meeting minutes revealed an informed and interested board. Although
agenda items can at times be extremely sensitive matters to board members, their conduct at meet-
ings should remain professional. The best way for the Board of Trustees to demonstrate that it is able
to assume typical board tasks, and to demonstrate its future ability for accreditation purposes, is to
model the behavior that is expected of community college board members.
Compton Community College District 17
Accrediting Commission for Community and Junior Colleges (ACCJC)
Standard III: Resources
The institution effectively uses its human, physical, technology, and financial resources to achieve its
broad educational purposes, including stated student learning outcomes, and to improve institutional
effectiveness.
B. Physical Resources – Physical resources, which include facilities, equipment, land, and
other assets, support student learning programs and services and improve institutional
effectiveness. Physical resource planning is integrated with institutional planning.
1. The institution provides safe and sufficient physical resources that support and assure the
integrity and quality of its programs and services, regardless of location or means of delivery.
a. The institution plans, builds, maintains, and upgrades or replaces its physical
resources in a manner that assures effective utilization and the continuing quality
necessary to support its programs and services.
b. The institution assures that physical resources at all locations where it offers
courses, programs, and services are constructed and maintained to assure access,
safety, security, and a healthful learning and working environment.
2. To assure the feasibility and effectiveness of physical resources in supporting institutional
programs and services, the institution plans and evaluates its facilities and equipment on a
regular basis, taking utilization and other relevant data into account.
a. Long-range capital plans support institutional improvement goals and reflect
projections of the total cost of ownership of new facilities and equipment.
b. Physical resource planning is integrated with institutional planning. The
institution systematically assesses the effective use of physical resources and uses
the results of the evaluation as the basis for improvement.
ACCJC Standard III 1
2 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
B. Physical Resources
Standard to be Addressed
Facilities Management – School Safety
The college has developed a plan
of security that includes adequate
1.3 6
measures of safety and protection of
people and property. [EC 32020]
The college ensures that the custodi-
al and maintenance staff is regularly
informed of restrictions pertaining
1.4 to the storage and disposal of flam- 3 3 3 4 4 5 5 5 8 8 9
mable or toxic materials. [F&AC
12981, H&SC 25163, 25500-25520,
LC 6360-6363, CCR Title 8 §5194]
The college has a documented
process for issuing master and sub-
master keys. A collegewide stan-
1.5 3 3 4 7 7 7 5 6 7 8 8
dardized process for the issuance of
keys to employees is followed by all
college administrators.
Outside lighting is properly placed
and monitored on a regular basis to
ensure the operability/adequacy of
such lighting and to ensure safety
while activities are in progress in
the evening hours. Outside light-
1.7 ing provides sufficient illumina- 2 2 3 5 6 6 6 7 8 8 8
tion to allow for the safe passage
of students and the public during
after-hours activities. Lighting also
provides security personnel with
sufficient illumination to observe
any illegal activities on campus.
Each public agency is required to
have on file written plans describing
1.9 procedures to be employed in case 6
of emergency. [EC 32001, GC 3100,
8607, CCR Title 8 §3220]
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 3
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Maintenance/custodial personnel
have knowledge of chemical com-
pounds used in school programs
1.11 that include the potential hazards 4 4 4 4 4 5 4 4 8 8 9
and shelf life. [F&AC 12981, H&SC
25163, 25500-25520, LC 6360-6363,
CCR Title 8 §5194]
Building examinations are per-
formed, and required actions are
1.12 taken by the Governing Board upon 5 5 6 6 6 5 4 4 7 8 8
report of unsafe conditions. [EC
81162]
Sanitary, neat and clean conditions
of the school premises exist and the
1.14 premises are free from conditions 2 2 3 6 7 6 6 4 7 8 8
that would create a fire hazard.
[CCR Title 5 §633]
The Injury and Illness Prevention
Program (IIPP) requires periodic
1.15 2 2 2 5 5 5 3 3 7 8 8
inspections of facilities to identify
conditions. [CCR Title 8 §3203]
Appropriate fire extinguishers exist in
each building and current inspection
1.16 6
information is available. [CCR Title 8
§6151]
All exits are free of obstructions.
1.17 7
[CCR Title 8 §3215]
A comprehensive school safety plan
1.18 exists for the prevention of campus 5 5 5 6 7 8 8 8 10 10 10
crime and violence. [EC 66300]
Requirements are followed pertaining
1.19 to underground storage tanks. [H&SC 7
25292, Title 23 Chapter 16]
All asbestos inspection and asbestos
work completed is performed by As-
bestos Hazard Emergency Response
1.20 6
Act (AHERA) accredited individuals.
[EC 49410.5, 15 USC 2641 et seq., 40
CFR part 763]
The standards in bold text are the identified subset of standards for ongoing reviews.
4 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
All playground equipment (at the
Child Development Center) meets
safety code regulations and is inspect-
1.21 8
ed in a timely fashion as to ensure the
safety of the students. [H&SC 115725-
115750, PRC 5411]
Safe work practices exist with
1.22 regard to boiler and fired pressure 4 4 4 7 8 8 8 4 8 9 9
vessels. [CCR Title 8 §782]
The college maintains Materials
1.23 Safety Data Sheets. [LC 6360 et seq., 6
CCR Title 8 §5194]
The college maintains a compre-
hensive employee safety program.
Employees are made aware of the
1.24 college safety program, and the col- 0 0 0 5 4 5 6 5 6 7 8
lege provides in-service training to
employees on the requirements of
the safety program.
The college conducts periodic first
1.25 0 0 0 4 5 5 3 4 6 6 7
aid training for employees.
Facilities Management – Facility Planning
The college has a long-range facilities
2.1 5
master plan.
The college possesses a Facilities
2.2 Planning Manual for the California 0 0 0 8 10 10 10 10 10 10 10
Community Colleges.
The college seeks state and local
2.3 6 6 7 10 10 10 10 10 10 10 10
funds.
The college has a district-wide Facility
2.4 5
Planning Committee in place.
The college has a properly staffed
2.5 and funded facility planning de- 0 0 1 8 8 8 8 7 8 9 9
partment.
The college has developed and
2.6 implemented an annual capital plan- 5 5 6 7 8 8 9 8 9 9 9
ning budget.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 5
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
The college has standards for real
2.7 property acquisition and disposal. 8
[EC 39006, 17230-17233]
The college has established and utiliz-
es a selection process for the selection
2.9 5
of licensed architectural/engineering
services. [GC 4526]
The college assesses its local bond-
2.10 4 4 4 8 9 10 9 8 10 10 10
ing capacity. [EC 15100]
The college has developed a process
2.11 4 4 4 8 9 10 9 8 10 10 10
to determine debt capacity.
The college is aware of and moni-
2.12 tors the assessed valuation of tax- 4 4 4 8 9 10 10 10 10 10 10
able property within its boundaries.
The college has developed an asset
2.14 5
management plan.
The college has established and
utilizes an organized methodol-
2.16 2 2 3 7 8 8 7 8 9 9 10
ogy of prioritizing and scheduling
projects.
A college that has passed a general
obligation bond has created a Citi-
zens Oversight Committee to ensure
2.19 6
the appropriateness of expenditures
related to the passage of the college’s
local school bond measure.
Facilities Management – Facilities Improvement and Modernization
The college has a restricted capital
outlay fund, and a portion of those
3.1 1 1 2 8 8 9 8 6 8 9 10
funds is expended for maintenance
and special repairs only. [EC 84660]
The college maintains a plan for the
maintenance and modernization
3.4 1 1 2 8 8 8 8 8 9 9 9
of its facilities. [EC 84660, 84670-
84674]
The college has established and
3.6 maintains a system for tracking the 2 2 3 6 7 8 8 9 9 10 10
progress of individual projects.
The standards in bold text are the identified subset of standards for ongoing reviews.
6 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Furniture and equipment items are
3.7 routinely included within the scope 2 2 2 6 7 8 7 7 8 8 8
of modernization projects.
Refurbishing, modernization, and
new construction projects take into
3.8 1 1 2 7 8 8 7 8 9 9 10
account technology infrastructure
needs.
The college obtains approval of plans
and specifications from the Divi-
sion of the State Architect prior to
3.9 8
the award of a contract to the lowest
responsible bidder. [EC 81052, 81130
et seq.]
All relocatables in use throughout the
3.10 college meet statutory requirements. 8
[EC 81130, 81160]
College staff are knowledgeable of
3.13 procedures in the Division of the 1 2 2 8 8 8 7 7 8 9 10
State Architect (DSA).
Facilities Management – Construction of Projects
The college maintains an appropri-
4.1 ate structure for the effective man- 1 1 1 6 6 7 6 7 8 9 9
agement of its construction projects.
Change orders are processed and
receive prior approval from required
4.2 parties before being implemented 6
within respective construction proj-
ects.
The college maintains appropriate
4.3 1 1 1 8 8 8 8 8 8 8 8
project records and drawings.
Each Inspector of Record (IOR) as-
4.4 10
signment is properly approved.
Facilities Management – Compliance with Public Contracting Laws and Procedures
The college complies with formal bid-
5.1 ding procedures. [GC 54202, 54204, 8
PCC 20111]
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 7
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
The college has a procedure for
5.2 requests for quotes/proposals. [GC 7
54202, 54204, PCC 20111]
The college maintains files of conflict
of interest statements and complies
with legal requirements. Conflict of
5.3 4 4 4 4 7 7 7 7 8 9 10
interest statements are collected an-
nually by the president/superinten-
dent and kept on file.
The college ensures that the biddable
plans and specifications are devel-
5.4 oped through its licensed architects/ 6
engineers for respective construction
projects.
The college ensures that requests
5.5 for progress payments are carefully 10
evaluated.
The college maintains contract award/
5.6 appeal processes. [GC 54202, 54204, 7
PCC 20111]
The college maintains internal con-
trol, security, and confidentiality over
5.7 7
the bid submission and award process-
es. [GC 54202, 54204, PCC 20111]
Facilities Management – Facilities Maintenance and Custodial
An energy conservation policy has
been approved by the Board of Edu-
8.1 0 0 0 3 6 7 7 7 8 8 8
cation and implemented throughout
the college.
Cost-effective, energy-efficient
8.3 design has been made a top priority 1 1 1 5 8 8 8 9 10 10 10
for all college construction projects.
The standards in bold text are the identified subset of standards for ongoing reviews.
8 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Adequate maintenance records
and reports are kept, including
a complete inventory of supplies,
materials, tools and equipment.
All employees required to perform
maintenance on the college sites are
8.5 provided with adequate supplies, 1 1 2 5 5 5 5 6 6 6 6
equipment, and training to perform
maintenance tasks in a timely and
professional manner. Included in
the training is how to inventory
supplies and equipment and when
to order or replenish them.
Procedures are in place for evaluat-
ing the work quality of maintenance
and operations staff. The qual-
ity of the work performed by the
8.6 maintenance and operations staff is 0 0 1 3 6 6 6 7 8 8 8
evaluated on a regular basis using
a board-adopted procedure that de-
lineates the areas of evaluation and
the types of work to be evaluated.
Major areas of custodial and main-
tenance responsibilities, and specif-
ic jobs to be performed, have been
identified. Custodial and main-
8.7 tenance personnel have written 2 2 3 5 7 7 7 8 8 8 8
job descriptions that delineate the
major areas of responsibilities they
will be expected to perform and on
which they will be evaluated.
Necessary staff, supplies, tools and
equipment for the proper care and
cleaning of the college are available.
To meet expectations, the college is
8.8 adequately staffed, and staff is pro- 4 4 4 5 5 7 7 7 8 8 8
vided with the necessary supplies,
tools and equipment as well as the
training associated with the proper
use of such.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 9
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
The college has an effective pre-
ventive maintenance program that
is scheduled and followed by the
8.9 maintenance staff. This program 0 0 0 5 5 5 6 6 7 8 9
includes verification of completion
of work by the supervisor of the
maintenance staff.
The Governing Board of the college
provides clean and operable flush
toilets for use of students. Toilet
8.10 facilities are adequate and main- 3 3 3 6 6 5 5 4 6 6 6
tained. All buildings and grounds
are maintained. [CCR Title 5 631,
CCR Title 5 14030, EC 17576]
The college has implemented a
planned program maintenance
system that includes an inventory
of all facilities and equipment that
will require maintenance and re-
8.11 0 0 0 6 7 7 7 8 8 9 9
placement. Data includes purchase
prices, anticipated life expectancies,
anticipated replacement time lines,
and budgetary resources necessary
to maintain the facilities.
The college has a documented
8.12 process for assigning routine repair 3 3 4 6 6 7 7 8 9 9 9
work orders on a priority basis.
Facilities Management – Instructional Program Issues
The college has developed a plan for
9.1 4 4 4 4 7 7 7 7 8 8 8
attractively landscaped facilities.
The Governing Board of any col-
lege maintains all of the campuses
established by it with equal rights
code code
and privileges as far as possible. [EC
9.3 3 3 4 section section
35293] The college has developed and
N/A N/A
maintains a plan to ensure equality
and equity of its facilities throughout
the college.
The college has adequate lighting,
9.4 electrical service, heating and ventila- 7
tion.
The standards in bold text are the identified subset of standards for ongoing reviews.
10 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Classrooms are free of noise and other
9.5 7
barriers to instruction. [EC 32212]
The learning environments provided
9.6 within the college are conducive to 8
high quality teaching and learning.
Facilities Management – Community Use of Facilities
Education Code Section 82537
establishes terms and conditions
of school facility use by commu-
nity organizations, in the process
10.2 5 5 5 8 8 8 8 9 9 9 9
requiring establishment of both “di-
rect cost” and “fair market” rental
rates, specifying what groups have
which priorities and fee schedules.
The college maintains comprehensive
records and controls on civic center
10.3 6
implementation and cash manage-
ment.
Facilities Management – Communication
The college’s public information
office coordinates a full appraisal to
students, staff and community of the
11.1 7
condition of the college’s facilities and
of efforts to rectify any substandard
conditions.
The college provides clear and com-
11.2 prehensive communication to staff of 5
its facilities plans.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 11
12 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.4 - School Safety - Restrictions
on Flammable and Toxic Materials
Legal Standard:
The college ensures that the custodial and maintenance staff is regularly informed of restrictions
pertaining to the storage and disposal of flammable or toxic materials. [F&AC 12981, H&SC 25163,
25500-25520, LC 6360-6363, CCR Title 8 §5194]
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district updated the Consolidated Contingency Plan in May 2015. The plan template is
provided by Los Angeles County to give organizations a format to comply with the emer-
gency planning requirements of three hazardous materials emergency response plans required
in California: Hazardous Materials Business Plan, Hazardous Waste Generator Contingency
Plan, and the Underground Storage Tank Emergency Response Plan and Monitoring Pro-
gram. This plan is relied on to meet storage and usage quantities required by California state
laws and regulations by the county of Los Angeles Certified Unified Program Agency. The
plan identifies contact information including response and medical treatment facilities in case
of an emergency. It identifies the Workplace Security Plan as the document used to coordi-
nate evacuation. The plan also includes procedures for prevention, mitigation, and abatement
of hazards, and lists emergency equipment to be available and employee training to be pro-
vided.
2. The Workplace Security Plan includes a communications system that is designed to encour-
age continuous flow of safety, health, and security information between management and
employees. The plan states the district will perform periodic inspections designed to identify
hazards, provide for freedom of movement and access, and ensure emergency contact infor-
mation is current and posted. The plan is on file at both the facilities and planning and the
police departments and is available for inspection by any users accessing the site. The plan
includes a complete site map for evacuation purposes.
The Keenan & Associates consulting firm conducted the district’s hazardous material inven-
tory on October 29, 2015. The findings of this report indicate that the district has effectively
implemented policies and procedures to ensure proper hazardous material storage. Recom-
mendations that were highlighted in the report had been corrected at the time of FCMAT’s
fieldwork.
3. The district has contracted with Tremco and instituted the American National Standards In-
stitute Z400.1-2003 for Material Safety Data Sheet preparation, which is a 16-section format.
This format has been accepted in the United States as meeting compliance requirements of
the Occupational Safety and Health Administration (OSHA) regulations.
4. An employee training plan is included in the 2015 Consolidated Contingency Plan that in-
cludes methods for safe handling of hazardous chemicals, procedures in the event of a re-
lease, use of emergency responder equipment and procedures for coordinating with other lo-
cal agencies.
ACCJC Standard III 13
5. A March 2016 memo to staff regarding Safety Data Sheets (SDS), also known as Material
Safety Data Sheets (MSDS), binders for each custodial closet indicated that binders will be
secured in the closet and contain SDS information. The memo further indicated that supervi-
sors will discuss SDS as part of their safety meetings and will update binders as needed.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 5
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
14 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.5 - School Safety -
Documented Process for Key Control
Professional Standard:
The college has a documented process for issuing master and sub-master keys. A collegewide stan-
dardized process for the issuance of keys to employees is followed by all college administrators.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton CCD’s Facilities Master Plan continues to include plans and techniques to pro-
vide electronic security throughout the campus. Components include door position switches,
motion detectors, and door controllers through a master server to audit and control access to
campus buildings. The district has created a key distribution chart that depicts the process for
issuing and controlling keys for new employees and an exit plan for those who leave the dis-
trict’s employ.
2. Rekeying had been incorporated in the district’s master plan, including the plan to rekey cam-
pus buildings with programmable key cards. Four buildings – the district’s Student Success
Center (SSC), Central Plant, Management Information System, and the Allied Health Build-
ing are finished and are equipped with programmable key card systems.
3. The key issuance process provides guidelines and procedures for the issuance and control
of keys and all forms of access to a door(s), master keys, buildings, cabinets, equipment, or
vehicles to ensure the security of all district facilities and property. The review team was pro-
vided documentation validating that the campus police control the distribution of all keys for
facilities and ensure the return of keys upon employee exit from employment.
4. The district has installed and activated 26 emergency “code blue” telephones strategically
located throughout the campus; the system is integrated with the electronic key card system.
Each code blue phone has a red emergency button that, when pressed, will automatically dial
911. These phones are to be used only for actual or perceived emergency situations. The dis-
trict has developed a graphic representation for the location of all security cameras and code
blue telephones that is posted in each building for emergency response procedures for stu-
dents, staff and faculty. Interviews indicated that the “code blue” telephones are functional,
are routinely tested to ensure the integrity of the system, and the camera system has assisted
in crime investigations such as parking lot vehicle damage and identifying accomplices to
crimes.
5. The district provided a sample completed Property and Equipment Release form that indi-
cated the signed acceptance of district keys by an employee.
6. Administrative Regulation 3331, Key Issuance and Return, includes information regarding
the return of keys. The district should ensure a college checkout procedure form is completed
and signed by the separating employee and their immediate supervisor. This document should
be maintained in the employee’s personnel file.
ACCJC Standard III 15
7. Interviews and documentation reviewed indicated that the district is moving toward key stan-
dardization with the ASSA key system. All modernized areas of the campus and new con-
struction will include key standardization as basic criteria of project construction.
Standard Implemented: Fully – Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 4
June 2009 Rating: 7
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 6
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
16 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.7 - School Safety - Installation
and Operation of Outside Security Lighting
Professional Standard:
Outside lighting is properly placed and monitored on a regular basis to ensure the operability/adequa-
cy of such lighting and to ensure safety while activities are in progress in the evening hours. Out-
side lighting provides sufficient illumination to allow for the safe passage of students and the public
during after-hour activities. Lighting also provides security personnel with sufficient illumination to
observe any illegal activities on campus.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has established a consistent schedule for checking lighting throughout the cam-
pus. The maintenance and operations staff and the campus Police Department routinely
inspect campus lighting conditions. Regular observations contribute to the timely repair of
inoperative lighting and the installation of additional lighting where a need has been deter-
mined.
2. The Facilities Master Plan dated July 2012 identifies lighting design goals and includes exist-
ing conditions and the proposed solutions for the entire campus. The plan has been completed
and includes new lighting standards for entry points to the campus, parking areas, pedestrian
pathways and stadium lighting. A notice of completion for the lighting project was approved
at the August 18, 2015 board meeting.
3. Lighting is listed as a standing agenda item for most Health and Safety Committee meetings.
Committee concerns and updates are discussed during these meetings.
4. Phase I photovoltaic (solar) panels for the Central Plant stadium lighting are installed and ap-
proved by Southern California Edison.
5. The district was allocated $170,000 in Proposition 39 funds for fiscal year 2014-15. A project
list approved by the California Energy Commission has been completed and included light-
ing upgrades in the Vocational Technology Building.
6. At the time of FCMAT’s fieldwork, some of the exterior lighting worked only intermittently,
and the district was in the process of resolving this issue.
ACCJC Standard III 17
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
18 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.11 - School Safety - Knowledge
of Chemicals and Potential Hazards
Legal Standard:
Maintenance/custodial personnel have knowledge of chemical compounds used in school programs
that include the potential hazards and shelf life. [F&AC 12981, H&SC 25163, 25500-25520, LC 6360-
6363, CCR Title 8 §5194]
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district updated the Consolidated Contingency Plan in May 2015. The plan identifies the
Workplace Security Plan as the document used to coordinate evacuation. The plan also in-
cludes procedures for prevention, mitigation, and abatement of hazards, and lists emergency
equipment to be available and employee training to be provided.
2. The updated Consolidated Contingency Plan includes emergency contact information in case
of a local emergency and identifies the following plans for hazardous materials:
Prevention
• Lab tech training and awareness for the handling, transporting and storage of hazardous
materials.
• Knowledge of Safety Data Sheets (SDS).
• Implementation of an Injury and Illness Prevention Program (IIPP) – hazard identification,
scheduled safety and inspections.
• Implementation of IIPP – hazard correction.
• General safety “tailgate” meeting, safety topics on personal protective equipment (PPE)
and other related topics.
Mitigation
• Safety awareness training to report any unsafe or hazardous condition as a priority one for
mitigation.
• Quarterly inspections of facility grounds and storage areas.
Abatement
• General training on personal safety through PPE, containment and abatement if material is
nonharmful.
• Emergency spills – Call Compton Fire Department for abatement (911).
• If planned abatement, contract with lowest-cost qualified vendor to provide services, certi-
fications and waste tickets for disposal.
3. A March 2016 memo sent to staff regarding SDS binders for each custodial closet indicated
that binders will be secured in the closet and contain SDS information. The memo further
ACCJC Standard III 19
indicated that supervisors will discuss SDS as part of their safety meetings and will update
binders as needed.
4. The IIPP, updated in October 2015, contains a hazardous materials and protection checklist
for use in inspecting laboratories and facilities. Included in the program are scheduled and
unscheduled inspections and a form to complete and submit if hazards are identified. Infor-
mation provided to FCMAT indicates that inspections were completed during this review
period. All forms in the IIPP have been updated to reflect the appropriate responsible parties.
Additionally, changes have been made to the document to mirror the common terminology
used in the industry.
5. The cleaning schedules provided to the review team include a list of the requirements to have
MSDS available on the work site.
6. A campuswide chemical inventory was completed on October 29, 2015. Records indicate that
the district has contracted with North Star Environmental to conduct a quarterly pickup of all
hazardous material.
7. In September 2014, the district completed an Asbestos Hazard Emergency Response Act
(AHERA) plan with the assistance of Alta Environmental. The plan includes an inventory of
assumed and tested asbestos material. The plan specifies initial and annual employee training
to include: familiarity with all plans and procedures specified in the Consolidated Contingen-
cy Plan, methods for safe handling of hazardous materials, safety procedures in the event of
a release or threatened release of a hazardous material, use of emergency response equipment
and supplies under their control, procedures for coordination with local emergency response
organizations, and hazardous waste generator training.
Standard Implemented: Fully - Substantially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 4
April 2013 Rating: 4
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
20 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.12 - School Safety - Inspection
and Correction of Unsafe Conditions
Legal Standard:
Building examinations are performed, and required actions are taken by the Governing Board upon
report of unsafe conditions. [EC 81162]
Progress on Implementing the Recommendations of the Recovery Plan:
1. A maintenance and operations planned work list was provided that reflects needed repairs
and improvements for the 2015-16 fiscal year. The improvements listed include ceiling tile
remediation in the gym, replacing exterior doors, repairing HVAC/boilers, replacing water
valves in showers/locker rooms, gas line repair in the Math and Science Building, flooring
replacement in the Administration and Vocational Technology buildings, paint in men’s and
women’s locker rooms and campuswide roofing.
FCMAT conducted site walks with the director of facilities planning and operations that
provided excellent visual confirmation of all the campus improvements, including painting,
installation of synthetic turf, installation of street signs, and the rejuvenation of landscaping
throughout the campus.
2. Health and Safety Committee meeting minutes record ongoing discussion items involving the
identification and reporting of safety issues and the remedial actions taken.
3. The IIPP, updated in October 2015, contains a hazardous materials and protection checklist
for use in inspecting laboratories and facilities. Included in the program are scheduled and
unscheduled inspections and a form to complete and submit if hazards are found.
4. Interviews indicated that the provost/CEO and director of facilities planning and operations
schedule regular site walks.
5. The district’s Program Effectiveness Summary, which addresses security, emergency pre-
paredness, fire prevention, playground safety, chemical safety, forklift safety and training,
asbestos, pest management and IIPP includes reporting of unsafe conditions and recommen-
dations for corrective action.
6. The district should continue to conduct routine site walks to ensure conditions identified dur-
ing the Health and Safety Committee meetings are addressed. The committee should review
any deficiencies identified using the Hazard Identification/Correction Form (Appendix F of
the CCCD Injury and Illness Prevention Program). This form is given to all employees and
provides a method to report various hazards on the campus. The committee should also track
how these hazards are corrected.
ACCJC Standard III 21
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 5
June 2012 Rating: 4
April 2013 Rating: 4
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
22 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.14 - School Safety -
Sanitation is Maintained and Fire Hazards are Corrected
Legal Standard:
Sanitary, neat, and clean conditions of the school premises exist and the premises are free from con-
ditions that would create a fire hazard. [CCR Title 5 §633]
Progress on Implementing the Recommendations of the Recovery Plan:
1. The condition of the campus continues to improve, and site walks conducted with the direc-
tor of facilities planning and operations demonstrated thorough cleaning and maintenance of
most buildings. During FCMAT’s fieldwork, the campus was clear of litter. Flowerbeds have
been installed in multiple areas and improved the overall campus aesthetics.
2. The maintenance department contracts annually with Advance Fire Extinguisher for all fire
extinguishers to be serviced. The district provided a matrix of the location, quantity, size and
manufacturer of fire extinguishers distributed throughout the campus. The utility maintenance
workers are responsible for checking all fire extinguishers monthly, which includes dating
and initialing the tags on each extinguisher. Fire extinguishers observed by FCMAT reflected
current service and inspections.
3. The Work Schedule Detail Report dated March 2016 lists tasks that are to be completed to
provide a safe, clean, and functional environment. FCMAT observed that accountability mea-
sures are in place to help ensure these procedures are followed and tasks are completed. At
the time of FCMAT’s fieldwork, a shift in the Maintenance and Operations Department’s re-
porting structure was evolving to ensure a greater level of accountability and that the director
of facilities planning and operations has more time to ensure proper oversight of all construc-
tion and modernization projects.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 4
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 23
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.15 - School Safety - Injury/
Illness Prevention Program Inspections are Done
Legal Standard:
The Injury and Illness Prevention Program (IIPP) requires periodic inspections of facilities to iden-
tify conditions. [CCR Title 8 §3203]
Progress on Implementing the Recommendations of the Recovery Plan:
1. The IIPP provided to FCMAT was updated in October 2015. The document specifies the fol-
lowing inspections:
Scheduled Safety Inspections
Upon initial implementation of the Program inspections of all work areas will be conducted.
All inspections will be documented using the attached forms (or equivalent) with appropriate
abatement of any hazards detected.
Thereafter, safety inspections will be conducted at the frequency described below:
1. Annual inspections of all office areas will be conducted to detect and eliminate any hazard-
ous conditions that may exist.
2. Semi-annual inspections of all potentially hazardous areas (shops, cafeterias, warehouses,
gymnasiums, sheds, etc.) will be conducted to detect and eliminate any hazardous condi-
tions that may exist.
Unscheduled Safety Inspections
1. Additional safety inspections will be conducted whenever new equipment or changes in
procedures are introduced into the workplace that present new hazards.
2. Keenan, or designee, will conduct periodic unscheduled safety inspections of all poten-
tially hazardous areas to assist in the maintenance of a safe and healthful workplace.
3. Safety reviews will be conducted when occupational accidents occur to identify and cor-
rect hazards that may have contributed to the accident.
2. FCMAT reviewed documentation indicating that required safety inspections occurred during
this review period.
3. The cleaning schedules list the requirements to fix or report unsafe conditions. FCMAT re-
viewed work order documentation and completion dates for work orders from April 1, 2015
through March 25, 2016 that demonstrated evidence of reporting, and repairs were performed
that demonstrate periodic inspections were completed.
24 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 3
April 2013 Rating: 3
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 25
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.18 - School Safety - Plan for
Prevention of Campus Crime and Violence
Legal Standard:
A comprehensive school safety plan exists for the prevention of campus crime and violence. [EC
66300]
Progress on Implementing the Recommendations of the Recovery Plan:
1. The El Camino Compton Center Workplace Security Plan dated 2015 establishes the mini-
mum requirements pursuant to the Jeanne Clery Disclosure of Campus Security and Crime
Statistics Act to maintain the following goals included in the plan: 1) to make every employ-
ee aware of the potential for violence in the workplace, 2) to increase the employee’s ability
to recognize the early warning signs of a potentially violent person or situation, 3) to explain
how to record incidents indicative of a potential problem, and 4) to encourage employees to
report suspicious incidents to the appropriate manager through proper procedures.
2. The district’s IIPP for workplace security addresses the hazards known to be associated with
the three major types of workplace violence. Type I workplace violence involves a violent
act by an assailant with no legitimate relationship to the workplace who enters the workplace
to commit a robbery or other criminal act. This type may also include an intruder attack at a
district office or the taking of hostages. Type II involves a violent act or threat of violence by
a recipient of a service provided by the district, such as a student, customer, passenger or a
criminal suspect or prisoner. Examples may include a disgruntled student or employee who
attempts to retaliate against the actions of faculty or staff such as a threat issued because of
poor grades, work assignments and/or personality conflicts. Type III involves a violent act or
threat by a current or former employee, student, supervisor or manager, or an employee’s or
student’s spouse or lover, an employee’s or student’s relative or friend, or another person who
has a dispute with an employee or student.
3. The campus police post campus alerts on the district website to inform the public about incident s
that occur on campus and to provide information on how to protect students, faculty and com-
munity members and report activities to the proper authorities.T he campus police utilize Nixle,
which is a community information service that helps the district stay connected to information
provided by campus police or local law enforcement agencies. Information is immediately avai-l
able over a cell phone by text message, by email, and over the web.A ccount information can be
customized so students or faculty receive the information that matters most to them. Only au-
thenticated agencies and community organizations can securely publish information.T here are
four types of messages: emergency alerts, advisories, community information and traffic.
4. The campus police have instituted a community policing philosophy. This philosophy empha-
sizes a partnership with relevant stakeholders. Police officers actively engage students, staff,
local businesses, and neighbors to proactively develop solutions to underlying conditions
related to campus safety. Police Department staff reported and crime statistics data indicated
that through this collaborative approach, the department has built credibility with the student
body and continues to limit criminal activity and unwanted behaviors.
26 ACCJC Standard III
Standard Implemented: Fully - Sustained
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 10
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 27
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.22 - School Safety -
Safety Boilers and Fired-Pressure Vessels
Legal Standard:
Safe work practices exist with regard to boiler and fired pressure vessels. [CCR Title 8 §782]
Progress on Implementing the Recommendations of the Recovery Plan:
1. Boiler maintenance continues to be outsourced through Southland Industries. Documentation
provided to the review team included blanket purchase orders for HVAC services, air condi-
tioning repair, and roof repair as needed.
2. At the time of FCMAT’s fieldwork, flue gas analysis was being scheduled with Southern
California Gas for boilers throughout the campus.
3. The district should conduct annual inspections of boilers and fired pressure vessels and docu-
ment deficiencies and repairs.
Standard Implemented: Fully - Substantially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 4
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
28 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.24 - School Safety -
Maintenance of a Comprehensive Employee Safety Program
Professional Standard:
The college maintains a comprehensive employee safety program. Employees are made aware of the
college safety program, and the college provides in-service training to employees on the require-
ments of the program.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Tartar Safety Committee mission states: “Our Mission is to provide and maintain a safe
campus environment through planning, training, education and dedication to improve safety
for our students, visitors, faculty and staff.”
2. The Work Environment Expectations document states that “every employee is responsible for
safety and for achieving the District’s goal of providing a safe work environment.”
3. The IIPP states that the program “describes the goals, statutory authority, and the responsi-
bilities of all employees under the Program. It addresses Compliance, Hazard Identification,
Accident Investigation, Hazard Mitigation, Training, Hazard Communication, and Program
Documentation. By making employee safety a high priority for every employee we can re-
duce injuries and illnesses, increase productivity, and promote a safer and healthier environ-
ment for all individuals at the Compton Community College District.”
4. The Consolidated Contingency Plan updated in May 2015 identifies emergency response
plans and procedures for the campus. The plan includes prevention, mitigation and abatement
of hazardous materials. The plan also includes notification procedures and employee training.
5. The Health and Safety Committee, chaired by the director of facilities planning and opera-
tions and the Police Department lieutenant, meets for one hour monthly to discuss needs,
concerns, and updates to issues. Members of the committee include staff from the Mainte-
nance and Operations Department, campus police, faculty, administration, and student repre-
sentatives.
6. Maintenance staff continue to receive professional development training for first aid, CPR,
and automated external defibrillator (AED) objectives in accordance with the American Heart
Association Heartsaver First Aid CPR AED program for the 2015-16 fiscal year. The director
of facilities planning and operations completed the certification process. Documentation pro-
vided to FCMAT confirms the maintenance and operations staff is current on their training.
7. The district is working with Keenan & Associates to expand routine safety trainings. In Oc-
tober 2015, managers, faculty and staff were provided online access to the following training
modules: Title IX and Sexual Misconduct, Clergy Act, Campus SaVE Act Employees-Sexual
Violence Awareness, and Active Shooter. Additional trainings were provided in the following
subject areas: environmental, energy management, security, health, human resources, nutri-
tional services, social and behavioral and transportation.
ACCJC Standard III 29
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 5
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 6
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
30 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.25 - School Safety - Conduct of
First Aid Training for School Site Personnel
Professional Standard:
The college conducts periodic first aid training for employees.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues to conduct the required training to ensure that maintenance and cus-
todial employees maintain valid first aid certifications. Maintenance and custodial staff are
scheduled to complete their bi-annual certification for first aid, CPR, and AED objectives and
skills evaluations in accordance with the American Heart Association Heartsaver First Aid
CPR AED program by October 2016.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 4
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 3
April 2013 Rating: 4
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 31
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.2 - Facility Planning -
Facilities Planning Manual
Professional Standard:
The college possesses a Facilities Planning Manual for the California Community Colleges.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district updated its Facilities Master Plan in July 2012. The plan includes sections cover-
ing new construction, facility improvements, existing building inventory, projected needs,
lighting, landscaping, energy efficiency priorities and recommendations.
2. The district uses the online Facilities Planning Manual of the California Community College
system. This plan includes the priority of its five-year construction plan projects and a budget
and narrative of each project’s intent and scope.
3. The district has decided to temporarily postpone updating the Facilities Master Plan. The
current focus is the development and implementation of an Educational Master Plan in con-
nection with the accreditation process. When the Educational Master Plan is completed,
interviews indicated that the district will use that as a roadmap to update the Facilities and
Technology Master Plans.
Standard Implemented: Fully - Sustained
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 8
January 2010 Rating: 10
July 2010 Rating: 10
June 2012 Rating: 10
April 2013 Rating: 10
April 2014 Rating: 10
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
32 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.3 - Facility Planning - Efforts to
Seek State and Local Matching Funds
Professional Standard:
The college seeks state and local funds.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has been proactive and successful in seeking local funds for capital improve-
ments as evidenced by the passage of Measure CC in November 2002, which authorized
the issuance of $100 million in general obligation bonds, and the passage of Measure C for
an additional $100 million in November 2014 at an approval rating of 78%. These bond
measures authorized funds to repair and renovate instructional classrooms and job training
facilities, and upgrade security systems, electrical capacity, computer technology, energy ef-
ficiency, and roofing systems.
2. Following are the district’s Proposition 39 projects:
Year 1 – The district was allocated $215,372 in Proposition 39 (California Clean Energy Jobs
Act) funds for fiscal year 2013-14. Express Energy Services completed this lighting upgrade
project last year. All close-out documentation for Year 1 was accepted by the state.
Year 2 – The district was allocated $170,000 in Proposition 39 funds for fiscal year 2014-15.
The approved project upgraded the lights in the Vocational Technology Building with more
energy efficient lights. The project was complete at the time of FCMAT’s fieldwork.
Year 3 – The district’s proposed allocation is $137,000 in Proposition 39 funds for fiscal year
2015-16. The district has been in discussions with Southern California Edison and the Gas
Company, and their consultants have provided the state with a proposed Year 3 project list,
which includes new boilers in the Vocational Technology Building, Math and Science Build-
ing, and the Child Development Building that was installed in March 2016.
Year 4 - The district anticipates a fourth year of funding to be provided for fiscal year 2016-
17 and is identifying additional projects for completion. A finalized project list had not been
completed at the time of FCMAT’s fieldwork.
3. The district continues to maximize local bond dollars with state funding for the infrastructure
replacement capital outlay projects. At the time of FCMAT’s fieldwork, it was reported that
the new Instructional Building #1 has been partially financed from state funding. The receipt
of any new state funding and management of these projects continues to reside with El Cami-
no CCD, which has the management responsibility to ensure that projects stay within scope
and budget.
ACCJC Standard III 33
Standard Implemented: Fully - Sustained
April 2007 Rating: 6
January 2008 Rating: 6
July 2008 Rating: 7
June 2009 Rating: 10
January 2010 Rating: 10
July 2010 Rating: 10
June 2012 Rating: 10
April 2013 Rating: 10
April 2014 Rating: 10
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
34 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.5 - Facility Planning - Properly
Staffed and Funded Facility Planning Function
Professional Standard:
The college has a properly staffed and funded facility planning department.
Progress on Implementing the Recommendations of the Recovery Plan:
1. In June 2013, the Compton CCD hired a permanent director of facilities planning and opera-
tions after operating with several interim facilities directors in the past.
2. The current staff includes the director of facilities planning and operations. The director was
a senior project manager for a construction management firm and worked with the district in
that capacity for several years. The director has extensive experience working with the state
regarding project funding and the Division of the State Architect’s Office.
3. The district augments planning of capital construction and modernization projects by con-
tracting for architecture and construction management services.
4. At the time of FCMAT’s fieldwork, it was reported that the organizational reporting structure
was going to be adjusted to ensure the director of facilities planning and operations was able
to spend more time overseeing modernization and capital projects.
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 1
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 35
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.6 - Facility Planning -
Implementation of an Annual Capital Planning Budget
Professional Standard:
The college has developed and implemented an annual capital planning budget.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The 2015-16 adopted budget includes items for site improvements and capital projects. The
projects included ceiling tile remediation in the gym, replacing exterior doors, repairing
HVAC/boilers, replacing water valves in showers/locker room, gas line repair in the Math
and Science Building, flooring replacement in the Administration and Vocational Technology
buildings, paint in men’s and women’s locker rooms and campuswide roofing.
2. The district’s five-year capital outlay plans are developed and updated in Fusion, a web-based
project planning and management software used by all of California’s community college
districts and the California Community Colleges Chancellor’s Office to support their facili-
ties. Fusion facilitates project planning analysis as a decision-making tool to determine the
district’s priority for projects receiving state funding under the five-year capital outlay plan.
Each project is defined by budget, intent and scope including the anticipated time schedule
and why the project is needed. The district contracts with HMC Architects to ensure all of the
above data points are accurately reported.
3. The district needs to develop a new five-year Facilities Master Plan; however, it cannot em-
bark on this process until the new Educational Master Plan has been completed. At the com-
pletion of both plans, the district should continue to fund the capital outlay projects.
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 9
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
36 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.10 - Facility Planning -
Assessment of Local Bonding Capacity and Monitor Legal Bonding Limits
Legal Standard:
The college assesses its local bonding capacity. [EC 15100]
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has historical assessed valuations provided by KNN Public Finance. The dis-
trict’s bonding capacity is a statutory limit on the amount of general obligation bonds that can
be issued, and all calculations are subject to validation by the Los Angeles County auditor-
controller. KNN provided the following calculations for the 2015-16 fiscal year based on:
• Current assessed value multiplied by statutory debt limit factor
• Less: outstanding general obligation bonds
• Statutory debt limit factor of 2.50% of assessed value for community college districts
Estimated Current Bonding Capacity
2015-16 Total Assessed Value $18,198,401,078
Statutory Debt Limit Factor 2.50%
Bonding Capacity $454,960,027
Outstanding General Obligation Bonds (78,150,577)
Available Bonding Capacity $376,809,450
Standard Implemented: Fully - Sustained
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 8
January 2010 Rating: 9
July 2010 Rating: 10
June 2012 Rating: 9
April 2013 Rating: 8
April 2014 Rating: 10
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 37
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.11 - Facility Planning -
Process to Determine Debt Capacity
Professional Standard:
The college has developed a process to determine debt capacity.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district contracts with KNN Public Finance to document and evaluate its debt capacity.
2. The 2015-16 assessed valuation is $18,198,401,078 and the district’s bonding capacity is es-
timated to be $454,960,027.
Standard Implemented: Fully - Sustained
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 8
January 2010 Rating: 9
July 2010 Rating: 10
June 2012 Rating: 9
April 2013 Rating: 8
April 2014 Rating: 10
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
38 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.12 - Facility Planning -
Awareness and Monitoring of Assessed Valuation
Professional Standard:
The college is aware of and monitors the assessed valuation of taxable property within its boundaries.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has successfully passed and issued local general obligation bonds under Measure
CC, authorized by the voters in November 2002, and Measure C authorized in November
2014. The assessed valuations of taxable property and fluctuations that may affect the dis-
trict’s bonding capacity are available from the Los Angeles County Auditor-Controller’s Of-
fice.
2. The district has experienced five consecutive years of assessed value growth after experienc-
ing two years of decline.
3. The estimated assessed valuation for fiscal year 2015-16, as provided by KNN Public Fi-
nance, is $18,198,401,078.
4. The district has a report that includes assessed valuation history, land use analysis, residential
parcel assessment analysis, delinquency history, largest secured taxpayers, and historical tax
rates.
Standard Implemented: Fully - Sustained
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 8
January 2010 Rating: 9
July 2010 Rating: 10
June 2012 Rating: 10
April 2013 Rating: 10
April 2014 Rating: 10
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 39
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.16 - Facility Planning -
Priorities and Scheduling of Projects
Professional Standard:
The college has established and utilizes an organized methodology of prioritizing and scheduling
projects.
Progress on Implementing the Recommendations of the Recovery Plan:
1. According to Education Code 15278, the purpose of the Citizens’ Bond Oversight Committee
is to “inform the public concerning the expenditure of bond revenues.” The Compton CCD
committee resumed meetings in May 2012 and continues to meet regularly.
2. The 2017-21 Five-Year Construction Plan dated March 2016 includes a list of capital facili-
ties projects prioritized in alignment with the plan.
3. The district has continued its engagement with construction management consultant Lend
Lease to assist with the state-funded projects as directed by the El Camino Community Col-
lege District.
4. In November 2015, Vicenti, Lloyd, Stutzman Business Consultants and CPAs completed an
independent financial audit of Proposition 39 General Obligation Bonds, Measure CC. The
opinion of this report indicated that the financial statements presented fairly the financial
position of the bonds as of June 30, 2015 in accordance with generally accepted accounting
principles.
Standard Implemented: Fully - Sustained
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 9
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
40 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.1 - Facilities Improvement
and Modernization - Appropriate Use of the Scheduled Maintenance and
Special Repair Funding in the Capital Outlay Projects Funds
Legal Standard:
The college has a restricted capital outlay fund, and a portion of those funds is expended for mainte-
nance and special repairs only. [EC 84660]
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district provided agendas and minutes of the Citizens’ Bond Oversight Committee meet-
ings and an estimate regarding the outstanding bonding capacity of the district. Financial
activity reports were provided from the district’s financial system depicting capital for routine
maintenance and special repair projects for 2015-16.
2. The district operates a restricted capital outlay fund that includes the five-year capital outlay
plans. They are developed, budgeted and updated in Fusion, a web-based project planning
and management software used by all of California’s community college districts and the
California Community Colleges Chancellor’s Office to support their facilities. At the time of
FCMAT’s fieldwork, the following projects were completed:
1. Student Success Center
2. Infrastructure Phase I & II
3. Management Information System (MIS)
4. Allied Health Building
5. Synthetic turf field
The following projects are under construction:
1. Theater
2. Swing space (temporary housing for Instructional Building #1)
3. Cosmetology Program classrooms
4. Campus Police Department office
5. Instructional Building #1
3. The district has taken steps to post Citizens’ Bond Oversight Committee meeting minutes to
the district’s website for public access; however, not all of the meeting minutes for 2014-15
and 2015-16 had been posted at the time of FCMAT’s fieldwork. The district has updated the
website to reflect the committee members’ specific areas of representation.
ACCJC Standard III 41
Standard Implemented: Fully - Sustained
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 9
June 2012 Rating 8
April 2013 Rating: 6
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
42 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.4 - Facilities Improvement and
Modernization - Plan for Maintenance and Modernization Exists
Legal Standard:
The college maintains a plan for the maintenance and modernization of its facilities. [EC 84660,
84670-84674]
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district’s Facilities Master Plan Update prepared by HMC Architects contains detailed
information regarding the district’s projects, including project justification, descriptions, and
costs; priority order; load distribution; staff forecast; instructional focus; and whether the
project is to be funded through local funds, the state or both. The plan includes detailed infor-
mation on infrastructure upgrades for the health and safety of students and staff.
2. Information included in the Facilities Master Plan Update indicates that the campus has ex-
isted in its current location for six decades and has been distinguished by the high quality and
durability of its facilities. Many of the buildings have a long history of service, and there is
a need to address issues arising from the evolving building code, aging infrastructure, and
deferred maintenance, and to embrace advances in energy efficiency and educational technol-
ogy. Analysis of the condition and cost to rehabilitate these facilities led to the identification
of those for which renovation is not a feasible option. In addition, the analysis of the existing
campus identified temporary facilities to be replaced with space in permanent facilities.
The Facilities Master Plan states in its introduction that it is designed to:
• Meet the requirements of the State Chancellor’s Office.
• Assist in decision making at the campus and the district.
• Reconcile directly into the Five-Year Capital Construction Plan.
• Be a living document to be revisited regularly (revise as needed).
3. The district provided a maintenance plan with a budget of $459,451 for the 2015-16 fiscal
year that included ceiling tile remediation in the gym, replacing exterior doors in the Student
Success Center, repair of the HVAC and boilers in the V-row, replacing water valves in show-
ers, repair of the main gas line, replacing flooring campuswide, painting the women’s and
men’s locker rooms and reroofing campuswide.
4. Several years ago the district migrated from the School Preventative Maintenance System
to the School Dude system for processing and managing maintenance work orders. The El
Camino CCD had an existing contractual relationship with School Dude, and the Compton
Center was added as a satellite school. This accessibility helps staff to quickly identify facil-
ity concerns and request repairs, and allows maintenance staff to more expeditiously learn of
issues and prioritize repairs. The School Dude work order system is also beneficial in that it
allows maintenance to track work orders electronically to ensure completion and to prevent
or more efficiently address common problems. The district has added the cost of the preven-
ACCJC Standard III 43
tive maintenance work order software to the planning budget including annual maintenance
costs.
Standard Implemented: Fully – Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
44 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.6 - Facilities Improvement and
Modernization - Maintenance of a System for Tracking Project Progress
Professional Standard:
The college has established and maintains a system for tracking the progress of individual projects.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The El Camino CCD has contracted with Lend Lease to provide services for the Compton
Center to monitor and track all state and local facilities projects. Lend Lease utilizes the Im-
pact 3D/I software program that is integrated with the California Community Colleges Chan-
cellor’s Office Fusion software and the district’s PeopleSoft financial software. The software
is web-based and allows for portal entry for data uploads with multiple-level security. The
software provides real-time data and includes but is not limited to reimbursement requests,
initial and final project proposals in Fusion, contracts, invoices, warrants and cash flow state-
ments by project.
2. At the time of FCMAT’s fieldwork, the following projects were completed or construction
plans were in progress:
Music Building Renovation (Y-Area/Little Theater)
The current total project budget is $2.5 million. WLC Architect, the architect of record for
this project, submitted the documents to DSA in December 2013. The bid contract for the
project was awarded on March 22, 2016 in the amount of $1.679 million. The project is un-
der construction.
Phase I – Central Plant/Stadium Lighting
The photovoltaic (solar) panels have been installed. The contractor is working on completing
an interconnectivity agreement with Southern California Edison to operate the solar panels.
The final power switch over to the new electrical system for the MIS and M&O buildings
was completed April 6, 2014. The old Central Plant was decommissioned. The new Central
Plant chilled water system provides cooling in the Math/Science, Childcare, and Vocational
Technology buildings while the building cooling programming continues. The project has
been closed out.
Phase I – Utility Infrastructure
Landscaping and irrigation along the main road is complete. Programming for the new light-
ing is complete. Connection of domestic water, gas and sewer to the existing buildings is
complete. The project was completed on August 18, 2015.
Retention Basin/Practice Field
The retention basin is complete, and the contractor installed irrigation and hydroseeded the
area. The project was completed in January 2015.
ACCJC Standard III 45
Phase II – Utility Infrastructure
Landscaping and irrigation along the main road, installation of fence panels in the northeast
corner near the Greenleaf entrance and connection of domestic water, gas and sewer to the
existing buildings is complete. The project was completed on August 18, 2015.
Allied Health Building
The California Department of Finance gave final approval for this project at the end of
February 2014. The preconstruction meeting with the general contractor, AMG, was held
March 20, 2014. A Notice to Proceed was issued to AMG on April 14, 2014. The project was
deemed complete in March 2016.
Standard Implemented: Fully - Sustained
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 9
April 2014 Rating: 9
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
46 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.7 - Facilities Improvement and
Modernization - Furniture and Equipment Included in Modernization Program
Professional Standard:
Furniture and equipment items are routinely included within the scope of modernization projects.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues to include furniture and equipment items routinely with each new con-
struction and modernization project.
2. Furniture and equipment planning are essential to ensure the facilities accommodate users’
needs and maximize the safe, effective and efficient use of facilities. The district provided a
furniture and equipment list for the Allied Health Building renovation project. The district
has established a furniture and equipment budget of $800,000 for this project.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 47
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.8 - Facilities Improvement and
Modernization - Technology Infrastructure Needs for Facilities Projects
Professional Standard:
Refurbishing, modernization, and new construction projects take into account technology infrastruc-
ture needs.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has developed a Comprehensive Master Plan using the program review process
to drive outcome. The program review process asks members of a discipline or department
to critically assess their program, identify necessary adjustments, and design a mechanism to
institute and evaluate proposed changes. Desired outcomes from the program review process
include evaluation of program effectiveness, program development and improvement, clarifi-
cation and achievement of program goals, assessment of student learning outcomes, and link-
age of planning and budgeting.
2. The district’s Technology Plan is integrated into the Comprehensive Master Plan. The Tech-
nology Plan indicates that it follows the Educational Plan and takes into consideration the
many technological needs cited in that chapter. The Technology Plan provides a technology
vision for the district and Compton Center, guiding planning principles, technology issues
to consider, resources, training, and the need for funding at both the district and the center.
Lastly, the plan lists planning agenda items to address the issues facing the district and the
center. The district continues to engage in a self-assessment process to determine the needs
and associated costs of upgrading infrastructure, including technology.
3. In 2014 AT&T performed a complete assessment of the district’s servers, life term of the
servers, and security of the network, and made recommendations on the network and security
including an assessment of campuswide Wi-Fi technologies. The goal was to provide Wi-Fi
access anytime and anywhere to students on campus.
Based on the AT&T assessment, the district proceeded with infrastructure, security and
wireless projects in 2015. The infrastructure project included the replacement of all data
communication support devices for the district, including intermediate distribution frame
(IDF) switches, and dually redundant fiber connections to the core. The existing Cisco ASA
firewalls were also replaced with next generation layer 7 Palo Alto firewalls, which included
exterior firewalls that protect the district via its ISP connection. Two internal firewalls were
implemented as part of the wireless installation. In summer 2015, approximately 200 access
points were deployed campuswide, which included internal spaces such as classrooms and
staff offices and external spaces such as athletics, library, student common areas, stadium and
parking lots. This $3.5 million project was completed over a six-month period.
4. The district hired a director of information technology during this review period. At the time
of FCMAT’s fieldwork, scheduled job shadowing for the transition between the director and
his predecessor was in process. This transition has facilitated the exchange of information re-
garding security documentation, capital projects and operational responsibilities.
48 ACCJC Standard III
5. The district needs to develop a new five-year technology plan; however, it cannot embark on
this process until the Educational Master Plan has been completed.
Standard Implemented: Fully - Sustained
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 9
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 49
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.13 - Facilities Improvement and
Modernization - Knowledge of Office of Public School Construction and
the Division of the State Architect Procedures
Professional Standard:
College staff are knowledgeable of procedures in the Division of the State Architect (DSA).
Progress on Implementing the Recommendations of the Recovery Plan:
1. DSA provides design and construction oversight for school districts and community colleges.
DSA develops and maintains accessibility standards and codes utilized in public and private
buildings throughout California. The regulations are complex and continually change.
The director of facilities planning and operations served previously as a senior project man-
ager for a construction management firm that worked with the district for several years. The
director has extensive experience in construction planning and development and is extremely
knowledgeable regarding DSA requirements for the application and submittal processes.
2. The district uses four separate architectural firms that have extensive knowledge of DSA re-
quirements.
Standard Implemented: Fully - Sustained
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
50 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 4.1 - Construction of Projects -
An Appropriate Project Management Structure Exists
Professional Standard:
The college maintains an appropriate structure for the effective management of its construction
projects.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district adopted Board Policy 6600, Capital Construction (revised October 16, 2012),
which dictates the CEO’s responsibility to plan and manage the district’s capital outlay and
construction programs.
2. The El Camino CCD has contracted with Lend Lease to provide services for the Compton
Center to monitor and track all state and local facilities projects. Lend Lease utilizes the Im-
pact 3D/I software program that is integrated with both the California Community Colleges
Chancellor’s Office Fusion software and the district’s PeopleSoft financial software. The
software is web-based and allows for portal entry for data uploads with multiple-level secu-
rity. The software offers real-time data and includes reimbursement requests, initial and final
project proposals, contracts, invoices, warrants and cash flow statements by project.
3. The CBO and director of facilities planning and operations jointly review facilities planning
and management of construction projects.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 6
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 51
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 4.3 - Construction of Projects -
Maintenance of Appropriate Project Records and Drawings
Professional Standard:
The college maintains appropriate project records and drawings.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district maintains an appropriate and organized automated and paper archive of all proj-
ect as-built architectural drawings and related contract documents. The more recent projects
are in good order and automated through the use of AutoCAD software.
2. The district contracts with project management, construction management, architect and en-
gineering firms that assist with project records management. The record-keeping system for
storing facility plans and drawings is adequate to fulfill this standard. However, records are
kept at multiple locations including the trailer where Lend Lease is housed and in the mainte-
nance department, rather than in one centralized location. District staff verified that district-
controlled plans have been moved to the Central Plant building, which is constructed from
concrete block and is fire rated.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
52 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 5.3 - Compliance with Public
Contracting Laws and Procedures - Conflict of Interest Statements and
Compliance
Professional Standard:
The college maintains files of conflict of interest statements and complies with legal requirements.
Conflict of interest statements are collected annually by the president/superintendent and kept on file.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Documentation was provided to support an updated certification to the state special trustee
regarding Form 700, Annual Filing of Statement of Economic Interests for the director of fa-
cilities planning and operations.
2. The provost/CEO and CBO have established procedures to collect the conflict of interest
statements for staff members who are employed by Compton CCD or El Camino CCD man-
agement staff that work on the Compton campus.
Standard Implemented: Fully - Sustained
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 53
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.1 - Facilities, Maintenance and
Custodial - Implementation of an Energy Conservation Policy
Professional Standard:
An energy conservation policy has been approved by the Board of Education and implemented
throughout the college.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD has adopted the California Community Colleges Board of Governors Energy
and Sustainability Policy that requires the district to exceed Title 24 regulations by 15% for
all construction projects approved at the college. The policy contains guidelines necessary to
reduce energy consumption pursuant to the Governor’s Executive Order that requires all com-
munity colleges to participate in statewide energy conservation and reduced electrical demand.
2. The district completed the Facilities Master Plan document that includes a critical component
on energy efficiency/sustainability. The plan details alternative methods to reduce energy and
alternative renewable energy sources for use in the design phase for all projects.
3. Board Policy 3340, Energy and Sustainability, was issued August 10, 2010. This policy dic-
tates the responsibility of the CEO in the development of a district energy and sustainability
plan. The policy also indicates that the CEO or designee shall establish regulations to ensure
the plan is properly administered, funded, executed, and monitored. Development and imple-
mentation of the energy conservation regulations are essential to full compliance with this
standard but had not been developed and adopted at the time of FCMAT’s fieldwork.
4. The district applied for a solar interconnection agreement through Southern California Edison
that authorizes the production of solar energy through the district’s Central Plant facility and
received written approval. The project was completed in March 2015.
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
54 ACCJC Standard III
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 55
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.3 - Facilities, Maintenance and
Custodial - Energy-Efficient Design Criteria for New Construction and
Modernization
Professional Standard:
Cost-effective, energy-efficient design has been made a top priority for all college construction proj-
ects.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton College was originally constructed and occupied in the early 1950s, including the
utility infrastructure for the campus. Four buildings have been added since construction of
the original campus in 1953. However, technology, power requirements, electrical upgrades,
mechanical upgrades, emergency communications, fire/life safety, and sewer requirements
have all changed per the Uniform Building Code requirements and the DSA’s office. The
board/special trustee adopted BP 3340 on August 10, 2010, and a number of incremental
steps have been taken to meet this standard. The district completed the Facilities Master Plan
document that includes a critical component on energy efficiency/sustainability. The plan de-
tails alternative methods to reduce energy and alternative renewable energy sources for use in
the design phase of all projects.
2. Pursuant to Government Code Section 15814.30 regarding all new public facilities and Title
24 of the California Code of Regulations, Part 6 titled Energy Code, Compton CCD contract-
ed with Southern California Edison on behalf of the 2009 Bridge Period California Commu-
nity College Partnership Program. This program meets the California Community Colleges
Board of Governors energy efficiency and conservation goals, and the California Public Utili-
ties Commission funds the incentive for the program.
3. Board Policy 3340, Energy and Sustainability, was issued August 10, 2010. This policy dic-
tates the responsibility of the CEO in the development of a district energy and sustainability
plan. The policy also indicates the CEO or designee shall establish regulations to ensure the
plan is properly administered, funded, executed, and monitored. Regulations supporting the
policy should identify the importance of cost-effective and energy-efficient design.
4. Ongoing verbal communications between the director of facilities planning and operations
and the provost/CEO identifies the status of capital facilities projects planned and under con-
struction.
5. The Five-Year Construction Plan narratives reflect the incorporation of best practices training
for staff, energy-efficient technology and energy management systems.
56 ACCJC Standard III
Standard Implemented: Fully - Sustained
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 9
April 2014 Rating: 10
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 57
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.5 - Facilities Maintenance and
Custodial - Adequate Maintenance Records and Inventories
Professional Standard:
Adequate maintenance records and reports are kept, including a complete inventory of supplies, ma-
terials, tools, and equipment. All employees required to perform maintenance on the college sites are
provided with adequate supplies, equipment, and training to perform maintenance tasks in a timely
and professional manner. Included in the training is how to inventory supplies and equipment and
when to order or replenish them.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The director of facilities planning and operations implemented the Hillyard Cleaning Cost
Analysis Program (CCAP) in fiscal year 2013-14. This program involves a site study by
Hillyard to include all custodial and janitorial areas. Cleaning and maintenance needs are as-
sessed based on a thorough evaluation of surface types and area size to determine the proper
products, methods, and staffing required to meet district standards; job cards are then devel-
oped for each process. The job cards include the standard, method, supplies and equipment
needed to complete each task, along with safety precautions. Hillyard provides training for
this program, including proper implementation and safety. An inventory, budget control, and
ordering system are also included in the program.
2. The district has implemented the School Dude work order system to schedule routine mainte-
nance tasks, track and assign work orders and manage larger maintenance and repair projects.
Supplies and equipment inventories are recorded manually. The district has an inventory of
supplies and materials and minor equipment, including tools, that is manually tracked on an
inventory list for related maintenance projects. In the prior review period, employees used a
checkout procedure to track the location of this type of equipment.
3. The implementation of these programs has increased the efficiency of the maintenance staff
by organizing schedules, tracking equipment and supply inventories, standardizing proce-
dures and improving training and competency. However, the inventory spreadsheet used to
track minor equipment and tools is not comprehensive and up-to-date, and the process of se-
curing small tools and equipment for maintenance and grounds in bins and checking them out
as needed has been suspended since November 2015 due to a staffing shortage.
58 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 6
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 59
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.6 - Facilities Maintenance and
Custodial - Procedures for Evaluation of Maintenance and Operations Staff
Professional Standard:
Procedures are in place for evaluating the work quality of maintenance and operations staff. The
quality of the work performed by the maintenance and operations staff is evaluated on a regular basis
using a board-adopted procedure that delineates the areas of evaluation and the types of work to be
evaluated.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has an evaluation process that includes board-approved standard evaluation
forms.
2. The district has created a process to notify departments to help ensure that evaluations are
performed and submitted timely to the Human Resources Department. The collective bar-
gaining agreement between Compton CCD and the Compton Community College Federation
of Classified Employees provides for every permanent classified employee to be evaluated
annually, no later than May 1. At the time of FCMAT’s fieldwork, all of the department’s em-
ployees were evaluated by April 2015 and were scheduled to be re-evaluated by April 2016.
3. The employee handbook addresses performance evaluations as a key component of personal
development, promotion and compensation. The chief human resources officer has provided
in-service training for supervisory personnel in the proper documentation of performance
standards. The training also includes guidelines for both new and current supervisory person-
nel in completing employee evaluations.
4. The chief human resources officer has implemented procedures to track and help ensure that
evaluations are done in compliance with board policy and collective bargaining agreements.
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
60 ACCJC Standard III
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 61
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.7 - Facilities Maintenance and
Custodial - Identification of Maintenance and Custodial Responsibilities
Professional Standard:
Major areas of custodial and maintenance responsibilities, and specific jobs to be performed, have
been identified. Custodial and maintenance personnel have written job descriptions that delineate the
major areas of responsibilities they will be expected to perform and on which they will be evaluated.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Job definitions and duties are documented in the job descriptions of the maintenance and cus-
todial employees. Tasks and descriptions are identified by job classification, e.g., carpenter or
utility maintenance worker. Standardization of jobs and functions is ongoing in an effort to
help to define processes, responsibilities and performance levels.
2. The director of facilities planning and operations uses the School Dude work order system to
schedule routine maintenance tasks, work order tasks and repair projects.
3. The director of facilities planning and operations implemented the Hillyard CCAP in 2013-
14 to determine campus custodial needs. The program provides specific direction as to the
frequency, method, supplies, equipment and time needed to complete each task.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
62 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.8 - Facilities Maintenance and
Custodial - Availability of Custodial Supplies and Equipment
Professional Standard:
Necessary staff, supplies, tools, and equipment for the proper care and cleaning of the college are
available. To meet expectations, the college is adequately staffed, and staff is provided with the nec-
essary supplies, tools, and equipment as well as the training associated with the proper use of such.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The director of facilities planning and operations implemented the Hillyard CCAP in fiscal
year 2013-14 to determine campus facility custodial needs. The program provides specific
direction as to the frequency, method, supplies, equipment and time needed to complete each
task. Cleaning standards may be adjusted according to staffing available. These adjustments
in the CCAP ensure that regular essential cleaning is maintained while the frequency of non-
essential tasks is reduced.
2. The director of facilities planning and operations uses the School Dude work order system to
schedule routine maintenance tasks, work order tasks and repair projects.
3. The implementation of these programs should increase the efficiency of the maintenance and
operations staff by organizing schedules, tracking equipment and supply inventories, stan-
dardizing procedures, and improving training and competency.
4. Staff interviewed indicated they had the tools and supplies needed to perform their duties.
During the prior review period, employees had to share equipment for some tasks; however,
the district has purchased custodial equipment, such as extractors and buffers, eliminating the
need for sharing.
5. As the district proceeds with its facilities campaign, the adequacy of maintenance and custo-
dial equipment should be evaluated annually and inventories of such need to be kept up-to-
date.
ACCJC Standard III 63
Standard Implemented: Fully - Substantially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
64 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.9 - Facilities Maintenance and
Custodial - Implementation of a Preventive Maintenance Program
Professional Standard:
The college has an effective preventive maintenance program that is scheduled and followed by the
maintenance staff. This program includes verification of completion of work by the supervisor of the
maintenance staff.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district provided a maintenance plan with a budget of $459,451 for the 2015-16 fiscal
year that included ceiling tile remediation in the gym, replacing exterior doors in the Student
Success Center, repair of the HVAC and boilers in the V-row, replacing water valves in show-
ers, repair of the main gas line, replacing flooring campuswide, painting the women’s and
men’s locker rooms and reroofing campuswide.
2. The director of facilities planning and operations implemented the Hillyard CCAP in fiscal
year 2013-14 to determine campus facility custodial needs. The program continues to provide
specific direction as to the frequency, method, supplies, equipment and time needed to com-
plete each task. Cleaning standards may be adjusted according to staffing available. These
adjustments in the CCAP ensure that regular essential cleaning is maintained while the fre-
quency of nonessential tasks is reduced.
3. The director of facilities planning and operations uses the School Dude work order system to
schedule routine maintenance tasks, work order tasks and repair projects.
4. The district has contracted with Southland Industries (Envise) and has implemented its Con-
cepts Two Preventative Maintenance Program. The Concepts Two program includes inven-
tory of equipment, air filter service on HVAC units and other special services, including a
thorough inspection of all mechanical equipment supporting Math/Science, Vocational Tech-
nology, MIS, Child Development and the old Central Plant buildings.
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 6
April 2013 Rating: 6
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 9
ACCJC Standard III 65
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
66 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.10 - Facilities Maintenance and
Custodial - Adequate Repair and Supervision of Buildings
Legal Standard:
The Governing Board of the college provides clean and operable flush toilets for use of students.
Toilet facilities are adequate and maintained. All buildings and grounds are maintained. [CCR Title 5
§631, CCR Title 5 §14030, EC 17576]
Progress on Implementing the Recommendations of the Recovery Plan:
1. Deep cleaning and maintenance have occurred in some restrooms, and visual inspections
by FCMAT validated that the district provides clean and operable flush toilets for students.
Limitations exist because of the age and condition of some of the facilities.
2. Interviews with staff indicated that programs are being implemented to ensure proper clean-
ing and maintenance of facilities.
3. The district has hired two provisional workers who restock supplies in the men’s and wom-
en’s restrooms as part of their daily duties.
4. At the time of FCMAT’s fieldwork, some of the grounds areas had not been properly main-
tained and weeded. District staff acknowledged the issue and indicated that plans are under
way to hire a senior groundskeeper that should address this issue.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 4
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 67
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.11 - Facilities Maintenance and
Custodial - Planned Program Maintenance System
Professional Standard:
The college has implemented a planned program maintenance system that includes an inventory of
all facilities and equipment that will require maintenance and replacement. Data includes purchase
prices, anticipated life expectancies, anticipated replacement time lines, and budgetary resources
necessary to maintain the facilities.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD has a board/special trustee-approved Facilities Master Plan, and prepares the
required annual five-year deferred maintenance and space inventory plans. A comprehen-
sive Facilities Master Plan has been completed regarding the condition and assessment of all
buildings. The plan includes components for energy efficiency, mechanical, electrical and fire
alarm systems, site utilities, technology, security and campus lighting. The Facilities Master
Plan is a blueprint for the district to follow regarding new construction and maintenance re-
quirements.
2. The district has implemented the School Dude work order system to schedule and track rou-
tine maintenance items to include servicing, repairing and replacing equipment.
3. HMC Architects prepared the district’s Facilities Master Plan. The plan contains detailed
information regarding the district’s projects including project justification, descriptions and
costs; priority order; load distribution; staff forecast; instructional focus; and whether the
project is to be funded through local funds, the state, or both. The plan includes detailed in-
formation on infrastructure upgrades for the health and safety of students and staff.
4. The district needs to develop a new five-year Facilities Master Plan; however, it cannot em-
bark on this process until the Educational Master Plan has been completed.
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 9
68 ACCJC Standard III
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 69
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.12 - Facilities Maintenance and
Custodial - Priorities for Assignment of Routine Repair Work Orders
Professional Standard:
The college has a documented process for assigning routine repair work orders on a priority basis.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district implemented the School Dude work order processing software and processes to
track ongoing projects and schedule routine duties.
2. The district has continued the work order prioritization process, with health and safety repairs
as the top priority for all employees. Facilities inspection log sheets have been created with
specific tasks for daily maintenance.
3. The provost/CEO and director of facilities planning and operations communicate weekly
with maintenance and custodial staff to budget, plan and prioritize facility needs.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
70 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 9.1 - Instructional Program
Issues - Plan for Attractive Landscaped Facilities
Professional Standard:
The college has developed a plan for attractively landscaped facilities.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district’s architect has developed conceptual landscape plans for improved campus land-
scaping. These are included in the 2012 Facilities Master Plan. The Facilities Master Plan de-
tails the overhaul of the campus infrastructure and the demolition and construction of several
structures, which are to be completed in the next few years. District staff report that the plans
to improve campus landscaping in some areas are on hold until after the major construction
has been completed. The district has developed a conceptual landscape plan that includes
partial components of the campus such as planting schemes, medians, parking lots and the
interior quad area.
2. As part of the employee evaluation process, each maintenance and operations staff member
is to adopt either a campus building or grounds area. District staff state that this adoption
program will help to identify landscaping areas that need to be addressed. The district has a
Facilities Master Plan that is augmented by funding from state and local (Measure CC and
Measure C) sources. Many of the requested projects will address some of the infrastructure
problems, such as nonfunctioning sprinklers, but many replacements or upgrades to the in-
frastructure cannot occur until a later phase of the Facilities Master Plan because of proposed
construction and demolition of existing facilities.
3. Campus landscaping was greatly improved with projects completed for the driveway access,
parking lots, etc.
Standard Implemented: Fully - Substantially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 71
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 10.2 - Community Use
of Facilities - Compliance with Civic Center Act for Community Use
Legal Standard:
Education Code Section 82537 establishes terms and conditions of school facility use by community
organizations, in the process requiring establishment of both “direct cost” and “fair market” rental
rates, specifying what groups have which priorities and fee schedules.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district revised Board Policy 6700, Civic Center and Other Facilities Use, on December
15, 2015. The policy states that the “District’s administrative rules, regulations, and pro-
cedures shall reflect the requirements of applicable law, including Education Code Section
82537, regarding Civic Centers.”
The district also revised Administrative Regulation 6701, Civic Center and Other Facilities
Use, on December 15, 2015. The administrative regulation identifies civic center permit cat-
egories and cash collection procedures.
The policy and corresponding administrative regulations are accompanied by a fee schedule
that lists fees for all facilities on the campus. Interviews indicated that the district is in the
process of adopting a new facility fee schedule for civic center use.
2. The adopted policies and regulations are in accordance with Education Code Sections 82537-
82548 and are based on fee schedules for nonprofit, youth and school activities, and other
for-profit organizations. However, Administrative Procedure 6701A, which includes the dis-
trict rental fee schedules, has not been revised since April 16, 2009. Administrative Regula-
tion 6701 states that these schedules are to be reviewed, updated and published annually.
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 9
April 2014 Rating: 9
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
72 ACCJC Standard III
Sources and Documentation
Interviews:
Chief business officer
Director of facilities planning and operations
Director of fiscal affairs
Director of information technology
Manager of MIS
Police lieutenant
Provost/chief executive officer
Special trustee
Utility maintenance supervisor
District Documents:
Board policies and administrative regulations relative to physical resources
CCCD/ECCD CEC 2015-16 organizational chart, February 11, 2016
Facilities Department organizational chart, March 1, 2016
CCCD Audit Report, period ending June 30, 2015
CCCD Proposition 39 Financial and Performance Audits, period ending June 30, 2015
District Assessed Valuation Calculation, 2014
El Camino College Compton Center Annual Security Report 2015
Consolidated Contingency Plan, revised May 2015
Custodial Machinery Inventory, February 2016
Grounds Equipment Inventory
Grounds Crew Schedule
Grounds Crew Zones, May 8, 2015
Grounds and Landscape Maintenance 2015
Work Order Summary Report, March 25, 2016
Allied Health Building Furniture and Equipment List
Scheduled Maintenance Allocation Workbook 2016
ACCJC Standard III 73
CCCD Hazard Prevention Form, October 2014
Material Safety Data Sheets - Memo to M&O Staff, March 21, 2016
Annual Unified Program Facility Permit, 2015-16
CCCD Safety Meeting minutes, 2014-15
CCCD Technology Plan 2012
CPR Training Log, October 2014
Forklift Training Log, December 2014
Sign-in Sheets for Various In-services provided to M&O Employees, 2015-16
Facilities Planning and Operations Crew Work Schedule, March 24, 2016
CCCD BOG Energy and Sustainability Policy
Classified Evaluation Schedule 2015
CCCD Facilities Master Plan, July 2012
Injury and Illness Prevention Program (IIPP), October 2015
Key Distribution Chart 2015
Fast Facts about El Camino College Compton Center and Measure C
Citizens’ Bond Oversight Committee meeting agendas and minutes, 2015-16
Form 700, director of facilities planning and operations, 2015
Collective Bargaining Agreement, Compton Community College Federation of Classified Employ-
ees, May 2, 2013
Compton Campus Projects Update memo from director of facilities planning and operations to CEO,
March 28, 2015
Exterior Lighting Plan Allied Health Building
Site Lighting Plan
AHERA Plan, September 17, 2014
Keenan SWACC Property and Liability Inspection Report, October 2015
Keenan Hazardous Material Inventory, 2015
Keenan Safe Colleges Training
2016 Fire Extinguisher Service Schedule
2017-21 Five-Year Construction Plan, March 2016
Southland Industries Preventative Maintenance Program, 2014-17
74 ACCJC Standard III
Air-Ex Air Conditioning Inc. Maintenance Services Agreement, May 22, 2015
Job Description Senior Groundskeeper
Property and Equipment Release Form
Program Effectiveness Summary
Work Schedule Detail Report, March 2016
Work Environment Expectations
2015-16 Adopted Budget
Financial Activity Reports, 2015-16
Classified Employee Handbook
Maintenance and Operations Planned Work List, 2015-16
Other:
Site walk/observation
Compton Community College District website (http://www.district.compton.edu)
ACCJC Standard III 75
Accrediting Commission for Community and Junior
Colleges (ACCJC) Standard III: Resources
The institution effectively uses its human, physical, technology, and financial resources to achieve its
broad educational purposes, including stated student learning outcomes, and to improve institutional
effectiveness.
C. Technology Resources – Technology resources are used to support student learning
programs and services and to improve institutional effectiveness. Technology planning
is integrated with institutional planning.
1. The institution assures that any technology support it provides is designed to meet the needs
of learning, teaching, college-wide communications, research, and operational systems.
a. Technology services, professional support, facilities, hardware, and software are designed to
enhance the operation and effectiveness of the institution.
b. The institution provides quality training in the effective application of its information technology
to students and personnel.
c. The institution systematically plans, acquires, maintains, and upgrades or replaces technology
infrastructure and equipment to meet institutional needs.
d. The distribution and utilization of technology resources support the development, maintenance,
and enhancement of its programs and services.
2. Technology planning is integrated with institutional planning. The institution systematically
assesses the effective use of technology resources and uses the results of evaluation as the
basis for improvement.
ACCJC Standard III 1
2 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
C. Technology Resources
Standard to be Addressed
Financial Management Standards -- Management Information Systems
Management information systems
support users with information that
is relevant, timely and accurate.
17.1 Standards are imposed to ensure 2 2 2 4 7 7 7 7 7 7 7
the maintainability, compatibility,
and supportability of the various
systems.
Automated systems are used to
improve accuracy, timeliness, and
efficiency of financial and reporting
17.2 2
systems. Employees receive appropri-
ate training and supervision in the
operation of the systems.
Selection of information systems
technology conforms to legal proce-
dures specified in the Public Contract
Code. Additionally, there is a process
to ensure that needs analyses, cost/
benefit analyses, and financing plans
17.3 are in place prior to commitment of 5
resources. The process facilitates
involvement by users, as well as
information services staff, to ensure
that training and support needs and
costs are considered in the acquisition
process.
Major technology systems are sup-
ported by implementation and train-
ing plans. The cost of implementation
17.4 and training is included with other 2
support costs in the cost/benefit anal-
yses and financing plans supporting
the acquisition of technology systems.
Access to administrative systems is
reliable and secure. Communications
pathways that connect users with
17.5 8
administrative systems are as free of
single points-of-failure as possible,
and are highly fault tolerant.
ACCJC Standard III 3
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Hardware and software purchases
conform to existing technology stan-
dards. Standards for copiers, printers,
fax machines, networking equip-
ment, and all other technology assets
are defined and enforced to increase
standardization and decrease sup-
port costs. Requisitions that contain
hardware or software items are for-
17.6 4
warded to the technology department
for approval prior to being converted
to purchase orders. Requisitions for
non-standard technology items are
approved by the Management Infor-
mation Systems Division unless the
user is informed that district support
for non-standard items will not be
available.
Computers are replaced on a sched-
17.7 ule based on hardware specifica- 1 1 1 6 8 8 8 8 7 7 7
tions.
Network standards, such as the follow-
ing, are being followed by the col-
lege: 1) A stable firewall is used with
separate DMZ and “inside” network; 2)
the college follows EIA/TIA 568-B for
all network cabling; 3) A Web content
filter is used for all outbound Internet
access; 4) The college uses an e-mail
spam filter for all inbound e-mail; 5)
Administrative and academic network
17.8 6
traffic is kept separate; 6) Switches
and network hubs are installed, and the
college ensures that switches support
certain features; 7) Login banners are
added to all network elements that will
support them; 8) The college has tran-
sitioned from all non-TCP/IP protocols;
and 9) The college uses a VPN for any
access to the internal network from the
outside.
4 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Administrative system users are
adequately trained in the use of
administrative systems and receive
17.9 1 2 2 6 7 7 7 8 8 8 8
periodic training updates to ensure
that they remain aware of system
changes and capabilities.
Business office computers, computer
screens, operating systems and soft-
17.10 8
ware applications used for administra-
tive system access are kept up to date.
ACCJC Standard III 5
6 ACCJC Standard III
ACCJC Standard III-C: Technology Resources
FCMAT Financial Management Standard 17.1 – Management Information
Systems
Professional Standard:
Management information systems support users with information that is relevant, timely and ac-
curate. Standards are imposed to ensure the maintainability, compatibility, and supportability of the
various systems.
Progress on Implementing the Recommendations of the Recovery Plan:
1. In February 2016 Compton CCD hired a full-time director of information technology to lead
technology efforts on the campus. This technology leadership position replaces the manager
of MIS position, which was staffed by El Camino CCD but funded by the Compton CCD. At
the time of FCMAT’s fieldwork, the new director was working in collaboration with his chief
technology officer counterpart at El Camino CCD.
2. Compton CCD has a technology plan for July 1, 2011 through June 30, 2016. The purpose of
the plan is to establish guidelines to help the district support and enhance technology. District
staff examined the state of technology throughout the Compton CCD and developed a five-
year plan to ensure adequate, reliable infrastructure and equipment. However, the increased
use of technology, outdated software applications, hardware limitations, and budgetary chal-
lenges all make this version of the plan obsolete.
No updates to this plan were provided to FCMAT during this review period; however, tech-
nology staff indicated that the district has begun a process to revise the plan, led by the dean
of student learning in the Career and Technical Education Department. The district recog-
nizes that the original technology plan focused on rebuilding the infrastructure, and there has
since been considerable change related to end user devices and applications. The recent mod-
ernization project included upgrading technology infrastructure to fiber-optic cable to meet
high speed data connection requirements campuswide. Staff reported that the upgrade is now
substantially complete with only some minor fiber extensions needing to be completed.
A major technology infrastructure upgrade took place during summer 2015. This included
an extensive analysis performed by AT&T of the existing networking equipment and com-
munication paths. As a result of the analysis, the 10-year-old core routers and switches were
replaced, single mode fiber was installed, and approximately 200 wireless access points were
installed.
The new wireless system provides students, staff, faculty and guests nearly campuswide cov-
erage from the parking lots to the classrooms along with appropriate login security manage-
ment.
The upgrade also addressed cyber security, with the replacement of the core firewall with two
new next generation layer 7 Palo Alto firewalls.
ACCJC Standard III 7
The technology plan needs to be updated to address critical limitations. It should identify
what is needed to incorporate and support advancing technologies. It should also clearly pres-
ent budget amounts and identify funding sources. The plan update should be a collaborative
project that incorporates representation from all specialties, and the technology management
team should take an active leadership role in developing the plan.
3. The district has worked diligently to stabilize its technology infrastructure over the last sev-
eral years to ensure its network is reliable. The district has a dedicated network server room
located in the Management Information Systems (MIS) Department. The server room has
a redundant cooling system and a generator power backup, ensuring the district’s ability to
avoid disruptions in service and properly protect the equipment. While the server room pro-
vides adequate space for district needs and houses recently replaced core MIS equipment, the
district has not yet begun to refurbish the rest of the technology center as organized work-
space for technology staff nor has a timeline been established for these improvements. Staff
indicated that this space reconfiguration has been put on hold pending the analysis of future
technology support staffing needs that may result from accreditation requirements.
4. The district manages a parallel system with routine backups of network data. This data is
stored locally on an EMC brand storage area network (SAN). A tape backup is created from
this SAN storage and is removed weekly and held at an offsite storage facility. Tapes are
stored at the offsite location for four weeks and then brought back into the tape rotation. If
the system requires restoration, only four weeks of data can be recovered. The technology
staff reported they are developing a disaster recovery system that will have real time disc-to-
disc backup to El Camino Community College with the intent to backup critical data and, in
the case of a disaster, to be able to recover access by making that data available on servers
located at El Camino Community College. The backup of data from the EMC SAN to an-
other SAN located at El Camino CCD has begun, and servers are in place at El Camino CCD
to host the needed backup software. However, the servers needed for recovery have yet to be
budgeted or purchased.
The new director of information technology has begun to re-evaluate the entire backup and
recovery strategy to determine if the current plan is the best option for the district. The direc-
tor has concerns that because Compton CCD and El Camino CCD are in the same regional
area, a large-scale disaster would negatively impact both sites and could impair the ability
to bring systems back online. The director indicated that he will investigate the feasibility of
cloud-based hosted systems, such as Microsoft’s Azure, for possible backup and restore op-
tions.
There is no documentation of specific backup and restore procedures or of the related staff
duties and responsibilities. The MIS Department should create written operational policies
and procedures documenting essential duties of the technology services staff, including those
related to systems backup. The district should review the four-week backup cycle to deter-
mine if this short period is adequate in meeting its need for data recovery. If a longer recov-
ery period is needed, increase it both in the current tape rotation procedures and in planning
for the new disaster recovery system.
8 ACCJC Standard III
5. Technology staff reported that when vendors are selected for projects, the vendors are re-
quired to provide system information (fixed asset, add, remove and change procedures,
manuals, etc.) as part of the scope of work. All documentation, including written procedures,
continues to be provided by El Camino CCD.
6. All technology support positions are Compton CCD employees. The manager of MIS had
continued his efforts to build capacity in the technology staff through training and dissemina-
tion of information and by working to implement and strengthen operational procedures that
support best practices. The new director of information technology continues to push routine
responsibility to the rest of the team, all of whom have played a significant role working with
and learning from vendors during modernization and upgrade projects.
As part of the recent Microsoft Exchange upgrade project, the MIS Department’s information
systems engineer attended a Microsoft Exchange migration class. The new director of infor-
mation technology acknowledges the need to continue providing timely and relevant profes-
sional learning opportunities to the technology support staff.
7. The district’s nine-member Technology Committee includes management, faculty, staff and
student representatives. The committee includes individuals who have an understanding of
technology including social media, cross-campus projects, and the need for long-range plans
in addition to support for individual issues. The committee meets monthly and prepares min-
utes; however, none were provided to FCMAT during this review period. Due to an increased
focus on regaining accreditation, staff reported that the committee has begun discussion of
technology staffing needed to manage and sustain technology services without support from
El Camino CCD, and must also propose a budget plan that addresses these needs along with
ongoing device and infrastructure replacement. The committee chair recognizes the need to
include all of these items in an updated technology plan.
8. Users in the Compton CCD business office must enter financial transaction data into two sep-
arate systems: Datatel (hosted at the El Camino CCD) and PeopleSoft (hosted at LACOE).
To address problems associated with duplicate data input, users at El Camino CCD have
developed applications that allow data entered into the Datatel system to be electronically
uploaded to PeopleSoft. The Compton CCD continues to struggle working in two systems,
as financial transactions are not updated timely into PeopleSoft. Staff cannot obtain a clear
picture of the district’s budget vs. actuals throughout the year because at any point there are
transactions that have been processed in Datatel that are not reflected in the PeopleSoft gen-
eral ledger.
Staff indicated that LACOE has issued a request for proposal (RFP) for a new integrated
financial system. However, until a decision is made and migration is complete, the business
office must continue to reconcile the two systems. Staff members continued to report that this
is a very time intensive process and ultimately the two systems are reconciled quarterly. Dur-
ing the prior review period, Compton CCD hired an accountant who has been assigned these
reconciliation duties. To automate this process, a macro has been created to analyze the data
from PeopleSoft and Datatel. The accountant uses this macro to identify and research the de-
tails of variances during quarterly reconciliations.
ACCJC Standard III 9
The district should continue efforts to routinely reconcile the information in the two systems.
If a new financial system is implemented, it will likely eliminate the need for the manual rec-
onciliation, creating greater efficiencies in budget and finance activities.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
10 ACCJC Standard III
ACCJC Standard III-C: Technology Resources
FCMAT Financial Management Standard 17.7 – Management Information
Systems
Professional Standard:
Computers are replaced on a schedule based on hardware specifications.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Staff indicated that the technology hardware inventory has been updated; however, no docu-
mentation of this effort was provided to FCMAT, and the district has not yet established an
ongoing replacement plan. Technology staff indicated a desire to consolidate the inventory
data to provide a single comprehensive accounting that becomes the basis for a replacement
schedule. As part of their efforts to create an accurate inventory, the technology group has
completed the upgrade to desktop/laptop management software to automatically produce
these inventory lists. This project included upgrading from Symantec’s Altiris Deployment
Solution 6.9 to Symantec Management Platform 7.5, which allows the district to accurately
inventory the Windows 7 and new computers. In addition to this feature, the software allows
technology staff to analyze the statistics generated related to the use of software applications
installed on computers. This information will be of great use in reviewing software licensing
counts, renewals and upgrades.
Technology has a limited useful life and requires ongoing support and upgrades to ensure
it remains functional. A comprehensive inventory and replacement schedule is essential to
district operations and the educational programs. Increased dependency on technology is cre-
ated as connectivity is enhanced and new equipment and software are acquired and installed.
The district needs to develop a technology equipment replacement schedule that includes cost
projections, and incorporate those projections into its multiyear financial projections, ensur-
ing that resources are identified to support this investment in technology. Although a budget
is prepared for the MIS Department, the district still lacks an ongoing budget commitment
for routine replacement of technology.
2. Staff indicated that over the past year the district replaced approximately 130 outdated com-
puters of the 189 utilized by staff. Approximately 95 of those replaced utilized the Windows
XP operating system, which Microsoft no longer supports. The district utilized a vendor to
help install these computers and migrate user data from the old computers to the new.
Staff also reported that the district replaced 149 lab computers, which is approximately 75%
of all lab computers, during summer 2015 as planned. Interviews indicated that the next sys-
tems targeted for replacement include approximately 100 five-year-old Dell laptops used by
staff and that staff will have their choice of either a laptop or tablet device as a replacement.
At the time of FCMAT’s fieldwork, this work had already begun with the technology staff
doing the data migration and installation.
3. Identifying a stable, reliable and ongoing funding source is among the greater challenges in
addressing equipment replacement needs. Interviews indicated that the outgoing manager of
MIS and the new director of information technology have been included in budget develop-
ACCJC Standard III 11
ment discussions for the 2016-17 proposed budget. At the time of FCMAT’s fieldwork, the
2016-17 budget was still being developed and both the director of information technology
and the CBO acknowledged the need to include a budget for equipment replacement, but an
amount had yet to be determined. The director of information technology has been instructed
by the CBO to develop an equipment replacement plan as soon as possible with the intent to
include estimated replacement costs in the 2016-17 proposed budget.
Although the district still lacks an official ongoing equipment replacement cycle, it has now
implemented tools that will allow staff to more accurately generate reports on aging hard-
ware, which in turn should help determine the replacement cycle components and the costs.
District administration should continue to meet with the technology leadership to identify and
discuss needs to sustain current technology and support identified technology improvements.
The district should identify stable, reliable and ongoing funding source(s) to meet the tech-
nology equipment replacement cycle and address new and ongoing needs.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 6
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
12 ACCJC Standard III
ACCJC Standard III-C: Technology Resources
FCMAT Financial Management Standard 17.9 – Management Information
Systems
Professional Standard:
Administrative system users are adequately trained in the use of administrative systems and receive
periodic training updates to ensure that they remain aware of system changes and capabilities.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Interviews with staff indicated that the challenge continues for the technology staff to seek
and attend formal trainings related to supporting administrative systems due to the number
and pace of technology related projects and staffing limitations. However, technology staff
members were extensively involved in the technology infrastructure upgrade project over the
last several years and have benefited greatly from training from contractors and vendors en-
gaged in the projects.
The direct involvement of technology staff in the comprehensive network assessment, and
the deployment and configuration of wireless networks, network switches, server virtualiza-
tion, fiber communication cabling, and a storage area network also served as hands-on pro-
fessional development. Vendors shared their knowledge with technology staff consistently
throughout these projects.
The district should continue assessing the needs of its administrative system users and focus
on developing and promoting training programs that address those needs. Although college
staff have universally accepted computer-based training-on-demand options, the specific
training needs of individual staff members should be a focus of improvement for this stan-
dard.
2. Training for end user staff is more complex, as it is based on applications utilized and the
needs of staff for individual departments. El Camino CCD provides most end user training,
and all district staff members are presented with opportunities to receive local training in ap-
plications such as PowerPoint, computer basics, screencasting, gradebook, Excel, and web-
page maintenance. LACOE offers routine annual trainings related to financial matters and
student attendance.
ACCJC Standard III 13
Standard Implemented: Fully – Substantially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
14 ACCJC Standard III
Sources and Documentation
Interviews:
Chief business officer
Chief technology officer, El Camino CCD
Dean of student learning
Director of information technology
Information systems engineer
Manager of MIS, El Camino CCD
District Documents:
Various email communications regarding staff training
El Camino College Compton Community Educational Center Technology Plan 2011-2016, June 13,
2012
2015-2016 Standing Committees, March 10, 2016
Other:
MIS Building tour/observation
ACCJC Standard III 15
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard III: Resources
The institution effectively uses its human, physical, technology, and financial resources to achieve its
broad educational purposes, including stated student learning outcomes, and to improve institutional
effectiveness.
D. Financial Resources – Financial resources are sufficient to support student learning
programs and services and to improve institutional effectiveness. The distribution of
resources supports the development, maintenance, and enhancement of programs and
services. The institution plans and manages its financial affairs with integrity and in
a manner that ensures financial stability. The level of financial resources provides a
reasonable expectation of both short-term and long-term financial solvency. Financial
resources planning is integrated with institutional planning.
1. The institution relies upon its mission and goals as the foundation for financial planning.
a. Financial planning is integrated with and supports all institutional planning.
b. Institutional planning reflects realistic assessment of financial resource availability, devel-
opment of financial resources, partnerships, and expenditure requirements.
c. When making short-range financial plans, the institution considers its long-range finan-
cial priorities to assure financial stability. The institution clearly identifies and plans for
payment of liabilities and future obligations.
d. The institution clearly defines and follows its guidelines and processes for financial plan-
ning and budget development, with all constituencies having appropriate opportunities to
participate in the development of institutional plans and budgets.
2. To assure the financial integrity of the institution and responsible use of financial resources,
the financial management system has appropriate control mechanisms and widely dissemi-
nates dependable and timely information for sound financial decision making.
a. Financial documents, including the budget and independent audit, reflect appropriate al-
location and use of financial resources to support student learning programs and services.
Institutional responses to external audit findings are comprehensive, timely, and communi-
cated appropriately.
b. Appropriate financial information is provided throughout the institution.
c. The institution has sufficient cash flow and reserves to maintain stability, strategies for ap-
propriate risk management, and realistic plans to meet financial emergencies and unfore-
seen occurrences.
d. The institution practices effective oversight of finances, including management of financial
aid, grants, externally funded programs, contractual relationships, auxiliary organizations
or foundations, and institutional investments and assets.
e. All financial resources, including those from auxiliary activities, fund-raising efforts, and grants
are used with integrity in a manner consistent with the mission and goals of the institution.
f. Contractual agreements with external entities are consistent with the mission and goals of
ACCJC Standard III 1
the institution, governed by institutional policies, and contain appropriate provisions to
maintain the integrity of the institution.
g. The institution regularly evaluates its financial management processes, and the results of
the evaluation are used to improve financial management systems.
3. The institution systematically assesses the effective use of financial resources and uses the
results of the evaluation as the basis for improvement.
2 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
D. Financial Resources
Standard to be Addressed
Financial Management Standards -- Internal Control Environment
Integrity and ethical behavior is
the product of the college’s ethi-
cal and behavioral standards, how
they are communicated, and how
1.1 they are reinforced in practice. All 1 2 4 5 6 5 5 6 8 9 9
management-level personnel exhibit
high integrity and ethical values in
carrying out their responsibilities
and directing the work of others.
The organizational structure clear-
ly identifies key areas of authority
1.4 and responsibility. Reporting lines 1 2 2 5 6 6 6 7 7 7 7
are clearly identified and logical
within each area.
Management has the ability to evalu-
1.5 ate job requirements and match the 2
requirements to the employee’s skills.
The college has procedures for recruit-
1.6 ing capable financial management and 2
staff and hiring competent people.
All employees are evaluated on
performance at least annually by a
management-level employee knowl-
edgeable about their work product.
The evaluation criteria are clearly
1.7 3 4 4 6 6 7 7 7 8 8 8
communicated and, to the extent
possible, measurable. The evaluation
includes a follow-up on prior perfor-
mance issues and establishes goals to
improve future performance.
Top management sets the tone
and establishes the environment.
1.8 Therefore, appropriate measures 0 0 4 5 5 5 1 5 6 7 8
are implemented to discourage and
detect fraud.
ACCJC Standard III 3
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards -- Inter- and Intra-Departmental Communications
The business and operations depart-
ments communicate regularly with
internal staff and all user depart-
ments on their responsibilities for
accounting procedures and internal
controls. The communications are
written whenever possible, particu-
larly when they (1) affect many staff
or user groups, (2) are issues of high
2.1 1 2 4 6 7 8 6 7 7 7 7
importance, or (3) reflect a change
in procedures. Procedures manuals
are necessary for the communication
of responsibilities. The departments
also are responsive to user depart-
ment needs, thus encouraging a free
exchange of information between the
two (excluding items of a confidential
nature).
The financial departments commu-
nicate regularly with the Governing
Board and community on the status
of college finances and the financial
impact of proposed expenditure
2.2 decisions. The communications are 1 2 2 5 6 7 3 5 7 7 8
written whenever possible, par-
ticularly when they affect many
community members, are issues of
high importance to the college and
board, or reflect a change in policy.
The Governing Board is engaged
in understanding globally the fiscal
status of the college, both current and
2.3 1
as projected. The board prioritizes
college fiscal issues among the top
discussion items.
The college has formal policies and
procedures that provide a mecha-
nism for individuals to report il-
2.4 1 1 3 5 5 5 3 5 7 8 9
legal acts, establish to whom illegal
acts should be reported, and pro-
vide a formal investigative process.
4 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Documents developed by the finan-
cial departments for distribution to
2.5 3 3 3 4 7 8 7 7 7 7 8
the board, staff and community are
easily understood.
Financial Management Standards -- Staff Professional Development
The college has developed and uses
a professional development plan for
training business staff. The plan
includes the input of business office
supervisors and managers, and, at
3.1 a minimum, identifies appropriate 2
programs office-wide. At best, each
individual staff and management
employee has a plan designed to meet
their individual professional develop-
ment needs.
The college develops and uses a
professional development plan for the
in-service training of department staff
by business staff on relevant business
3.2 0
procedures and internal controls. The
plan includes the input of the business
office and the departments/divisions
and is updated annually.
Financial Management Standards -- Internal Audit
The Governing Board has adopted
policies establishing an internal au-
4.1 0 0 4 8 6 6 1 3 4 4 6
dit function that reports directly to
the president or Governing Board.
Internal audit functions are designed
into the organizational structure of
the college. These functions include
4.2 periodic internal audits of areas at 0
high risk for non-compliance with
laws and regulations and/or at high
risk for monetary loss.
Qualified staff members are assigned
4.3 to conduct internal audits and are 0
supervised by an independent body.
ACCJC Standard III 5
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Internal audit findings are reported
on a timely basis to the Govern-
ing Board and administration, as
4.4 0 0 1 3 5 5 0 3 4 4 5
appropriate. Management then
takes timely action to follow up and
resolve audit findings.
Financial Management Standards -- Budget Development Process (Policy)
The budget development process
requires a policy-oriented focus by
the Governing Board to develop an
expenditure plan that fulfills the
college’s goals and objectives. The
Governing Board focuses on ex-
5.1 penditure standards and formulas 1 1 2 4 7 8 3 5 6 7 7
that meet the college’s goals. The
Governing Board avoids specific
line-item focus, but directs staff to
design an entire expenditure plan
focusing on student and college
needs.
The budget development process
5.2 includes input from staff, administra- 1
tors, board and community.
Policies and regulations exist re-
5.3 garding budget development and 1 1 0 6 8 8 8 8 9 10 10
monitoring.
The college has a clear process to
analyze resources and allocations
to ensure that they are aligned
5.4 0 0 1 5 7 7 4 4 4 5 6
with strategic planning objectives
and that the budget reflects college
priorities.
The college has policies to facilitate
development of a budget that is un-
5.5 derstandable, meaningful, reflective 0
of college priorities, and balanced in
terms of revenues and expenditures.
6 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Categorical funds are an integral
part of the budget process and have
been integrated into the entire
budget development. The revenues
and expenditures for categorical
programs are reviewed and evalu-
5.6 ated in the same manner as unre- 0 0 1 5 7 7 4 4 4 5 6
stricted general fund revenues and
expenditures. Categorical program
development is integrated with the
college’s goals and is used to respond
to specific college student needs to
support student learning outcomes.
The college has the ability to accu-
rately reflect its net ending balance
throughout the budget monitoring pro-
cess. The 311A and 311Q reports pro-
vide valid updates of the college’s net
5.7 0
ending balance. The college has tools
and processes that ensure that there is
an early warning of any discrepancies
between the budget projections and
actual revenues or expenditures.
The college utilizes formulas for allo-
cating funds to departments/divisions.
This can include staffing ratios, sup-
5.8 0
ply allocations, etc. These formulas
are in line with the board’s goals and
directions, and are not overridden.
Financial Management Standards -- Budget Development Process (Technical)
The Budget Office has a technical
process to build the preliminary
budget amounts that includes: the
forecast of revenues, the verification
and projection of expenditures, the
identification of known carryovers
6.1 and accruals and the inclusion of 0 1 1 5 6 6 3 4 4 4 4
concluded expenditure plans. The
process clearly identifies the sources
and uses of funds. Reasonable FTES
and COLA estimates are used when
planning and budgeting. The same
process is applied to all funds.
ACCJC Standard III 7
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
An adopted budget calendar exists
that meets legal and management re-
6.2 quirements. At a minimum the calen- 0
dar identifies statutory due dates and
major budget development activities.
Standardized budget worksheets are
used to communicate budget requests,
6.3 0
budget allocations, formulas applied
and guidelines.
Financial Management – Budget Adoption, Reporting, and Audits
The college adopts its annual budget
7.1 and files it with the Chancellor’s Of- 0
fice within the statutory time lines.
The college has procedures that provide
for the development and submission of a
7.3 college budget and interim reports that 5
adhere to criteria and standards and are
approved by the Chancellor’s Office.
The college completes and files its
7.4 interim budget reports within the 2
statutory deadlines.
The quarterly fiscal status reports
show an accurate projection of the
7.5 ending fund balance. Material differ- 3 3 1 3 6 6 4 4 4 5 5
ences are presented to the Governing
Board with detailed explanations.
The college has complied with the
Governmental Accounting Standard
No. 34 (GASB 34) which requires the
college to develop policies and proce-
7.6 8
dures and report in the annual finan-
cial reports on the modified accrual
basis of accounting and the accrual
basis of accounting.
The college has arranged for an an-
7.7 nual audit (single audit) within the 8
deadlines established.
Financial Management Standards -- Budget Monitoring
All purchase orders are properly encum-
8.1 1
bered against the budget until payment.
8 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
There are budget monitoring con-
trols, such as periodic reports, to
alert department and site managers
8.2 of the potential for over-expenditure 0 3 3 4 6 7 5 5 6 6 6
of budgeted amounts. Revenue and
expenditures are forecast and veri-
fied monthly.
Budget revisions are made on a regular
basis and occur per established proce-
8.4 0
dures, and are approved by the Govern-
ing Board.
The college uses an effective position
control system that tracks personnel
allocations and expenditures. The po-
8.5 sition control system effectively estab- 1 1 1 3 7 8 6 6 6 6 6
lishes checks and balances between
personnel decisions and budgeted
appropriations.
Financial Management Standards -- Budget Communications
The college budget is a clear mani-
festation of college policies and is
9.1 0
presented in a manner that facilitates
communication of those policies.
The college budget clearly identifies
9.2 0 1 1 2 6 7 8 9 10 10 10
one-time sources and uses of funds.
Financial Management Standards -- Attendance Accounting
An accurate record of enrollment
11.1 5 5 5 5 5 6 5 6 6 6 6
and attendance is maintained.
Students are enrolled and attendance
reports are completed by staff and
11.3 entered into the student information 3
system in an efficient, accurate, and
timely manner.
Procedures are in place to ensure
that enrollment and attendance
accounting and reporting require-
ments are met for weekly student
11.5 3 5 5 5 5 6 3 5 6 6 6
contact hours (WSCH), daily stu-
dent contact hours (DSCH), credit,
non-credit, high school concurrent
enrollment, and positive attendance.
ACCJC Standard III 9
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards -- Accounting, Purchasing and Warehousing
The college adheres to the Budget
and Accounting Manual (BAM) and
12.1 Generally Accepted Accounting Prin- 1
ciples (GAAP) as required by Educa-
tion Code Section 84030.
The college timely and accurately
records all information regarding
financial activity (unrestricted and
restricted) for all programs. Gener-
ally Accepted Accounting Principles
(GAAP) requires that for financial
12.2 reporting to serve the needs of the 2 3 3 3 5 7 3 5 6 7 8
users, it must be reliable and timely.
Therefore, the timely and accurate
recording of the underlying trans-
actions (revenue and expenditures)
is an essential function of the col-
lege’s financial management.
The college forecasts its revenues and
expenditures and verifies those pro-
jections monthly to adequately man-
age its cash. In addition, the college
reconciles its cash to bank statements
12.3 and reports from the county trea- 2 2 2 2 5 6 5 5 5 6 7
surer monthly. Standard accounting
practice dictates that, to ensure that
all cash receipts are deposited timely
and recorded properly, cash is recon-
ciled to bank statements monthly.
The college’s payroll procedures are
in compliance with established re-
quirements. (Education Code Section
12.4 85241) Standard accounting practice 1 5 5 5 7 7 5 5 6 6 6
dictates that the college implements
procedures to ensure the timely and
accurate processing of payroll.
Standard accounting practice
dictates that the accounting work
is properly supervised and work
12.5 reviewed to ensure that transactions 1 2 2 4 5 6 3 5 6 6 7
are recorded timely and accurately,
and allow the preparation of peri-
odic financial statements.
10 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Categorical programs, either through
specific program requirements or
through general cost principals,
12.6 require that entities receiving such 2
funds must have an adequate system
to account for those revenues and
related expenditures.
Generally accepted accounting prac-
tices dictate that, to ensure accurate
recording of transactions, the college
have standard procedures for clos-
12.7 ing its books at fiscal year-end. The 1 1 0 2 4 7 3 5 6 7 7
college’s year-end closing procedures
should comply with the procedures
and requirements established by the
Chancellor’s Office.
The college complies with the bidding
requirements of Public Contract Code
Section 20111. Standard accounting
practice dictates that the college have
adequate purchasing and warehousing
procedures to ensure that only properly
12.8 4
authorized purchases are made, that au-
thorized purchases are made consistent
with college policies and management
direction, that inventories are safeguard-
ed, and that purchases and inventories
are timely and accurately recorded.
The college has documented proce-
dures for the receipt, expenditure
and monitoring of all construction-
12.9 related activities. Included in the 2 2 2 4 6 7 4 6 7 7 8
procedures are specific requirements
for the approval and payment of all
construction-related expenditures.
The accounting system has an appro-
12.10 priate level of controls to prevent and 1
detect errors and irregularities.
The college has implemented an ac-
count code structure that enables the
12.11 standard financial reporting required 4
by the state and ensures that the col-
lege is in compliance with guidelines.
ACCJC Standard III 11
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards – Student Body Funds
The Governing Board adopts poli-
cies and procedures to ensure com-
13.1 pliance regarding how student body 3 3 4 5 7 9 5 5 5 5 5
organizations deposit, invest, spend,
raise and audit student body funds.
Proper supervision of all student body
funds is provided by the Board. This
includes establishing responsibilities
for managing and overseeing the ac-
13.2 tivities and funds of student organiza- 2
tions, including providing procedures
for the proper handling, recording and
reporting of revenues and expendi-
tures.
The college provides training and
guidance to college personnel and stu-
13.3 1
dents on the policies and procedures
governing student body accounts.
Monitoring is performed by the
Business Services Office to provide
13.4 adequate oversight of student funds 1 1 2 6 8 9 5 5 5 5 6
and to ensure proper handling and
reporting.
Financial Management Standards -- Multi Year Financial Projections
The college annually provides a
multiyear revenue and expendi-
ture projection for all funds of the
14.2 college. Projected fund balance 0 0 0 1 5 7 2 4 4 4 4
reserves are disclosed. The assump-
tions for revenues and expenditures
are reasonable and supportable.
Multiyear financial projections are
prepared for use in the decision-
14.3 making process, especially whenever 0
a significant multiyear expenditure
commitment is contemplated.
Assumptions used in developing
14.4 multiyear projections are based on the 0
most accurate information available.
12 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards -- Long-Term Debt Obligations
The college complies with public
disclosure laws of fiscal obliga-
tions related to health and welfare
15.1 0 5 5 5 6 7 8 8 9 10 10
benefits for retirees, self-insured
workers’ compensation, and collec-
tive bargaining agreements.
When authorized, the college uses only
non-voter approved, long-term financ-
ing such as certificates of participation
(COPS), revenue bonds, and lease-
purchase agreements (capital leases) to
15.2 8
address capital needs, and not opera-
tions. Further, the general fund is used
to finance current school operations,
and in general is not used to pay for
these types of long-term commitments.
For long-term liabilities/debt service,
the college prepares debt service
schedules and identifies the dedicated
funding sources to make those debt
service payments. The college proj-
ects cash receipts from the dedicated
revenue sources to ensure that it will
15.3 have sufficient funds to make periodic 8
debt payments. Cash flow projections
are continually monitored to ensure
that any variances from the projec-
tions are identified as early as possible
to allow the district sufficient time to
take appropriate measures or identify
alternative funding sources.
The college has developed and uses a
financial plan to ensure that ongoing
unfunded liabilities from employee
benefits are recognized as a liabil-
15.4 0
ity of the college. A plan has been
established for funding retiree health
benefit costs as the obligations are
incurred.
ACCJC Standard III 13
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards -- Impact of Collective Bargaining
The college has developed param-
eters and guidelines for collective
bargaining that ensure that the
collective bargaining agreement is
not an impediment to efficiency of
college operations. At least annu-
ally, collective bargaining agree-
ments are analyzed by management
to identify those characteristics
that are impediments to effective
delivery of college operations. The
college identifies those issues for
consideration by the Governing
16.1 8 8 8 8 8 8 8 8 8 9 10
Board. The Governing Board, in
the development of its guidelines
for collective bargaining, considers
the impact on college operations of
current collective bargaining lan-
guage, and proposes amendments to
contract language as appropriate to
ensure effective and efficient college
delivery. Governing Board param-
eters are provided in a confidential
environment, reflective of the obli-
gations of a closed executive board
session.
14 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
The Governing Board ensures that
any guideline developed for collec-
tive bargaining is fiscally aligned with
the instructional and fiscal goals on a
multiyear basis. The president ensures
that the college has a formal process in
which collective bargaining multiyear
costs are identified for the Governing
Board, and those expenditure changes
are identified and implemented as nec-
essary prior to any imposition of new
collective bargaining obligations. The
16.2 Governing Board ensures that costs and 0
projected college revenues and expendi-
tures are validated on a multiyear basis
so that the fiscal issues faced by the
college are not worsened by bargain-
ing settlements. The public is informed
about budget reductions that will be
required for a bargaining agreement
prior to any contract acceptance by the
Governing Board. The public is notified
of the provisions of the final proposed
bargaining settlement and is provided
with an opportunity to comment.
Financial Management Standards -- Maintenance and Operations Fiscal Controls
The college has a comprehensive
risk-management program that
monitors the various aspects of risk
18.1 management including workers’ 4 5 6 6 6 6 8 9 9 10 10
compensation, property and liabil-
ity insurance, and maintains the
financial well-being of the college.
The college has a work order system
that tracks all maintenance re-
18.2 quests, the worker assigned, dates 2 2 3 5 5 7 7 7 8 8 8
of completion, labor time spent and
the cost of materials.
The college controls the use of fa-
18.3 cilities and charges fees for usage in 5 5 4 5 7 7 7 9 9 8 8
accordance with college policy.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 15
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
The Maintenance Department fol-
lows standard college purchasing
protocols. Open purchase orders
18.4 5 5 4 4 7 6 7 8 9 10 10
may be used if controlled by limit-
ing the employees authorized to
make the purchase and the amount.
Materials and equipment/tools
inventory are safeguarded from loss
18.5 5 5 6 6 6 6 4 4 4 5 5
through appropriate physical and
accounting controls.
College-owned vehicles are used only
18.6 for college purposes. Fuel is invento- 5
ried and controlled as to use.
Capital equipment and furniture is
18.8 tagged as college-owned property and 1
inventoried at least annually.
The college adheres to bid and force
account requirements found in the
Public Contract Code (Sections 20111
and 20114). These requirements in-
clude formal bids for materials, equip-
18.9 7
ment and maintenance projects that
exceed $50,000; capital projects of
$15,000 or more; and labor when the
job exceeds 750 hours or the materials
exceed $21,000.
Standard accounting practices dictate
that the college has adequate purchas-
ing and contract controls to ensure that
only properly authorized purchases
are made and independent contracts
approved, and that authorized pur-
18.10 chases and independent contracts are 4
made consistent with college policies,
procedures, and management direc-
tion. In addition, appropriate levels of
signature authorization are maintained
to prevent or discourage inappropriate
purchases or contract awards.
The standards in bold text are the identified subset of standards for ongoing reviews.
16 ACCJC Standard III
Accrediting Commission for
April Jan. July June Jan. July June April April April April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards – Food Service Fiscal Controls
The college operates the food service
19.1 programs in accordance with appli- 3
cable laws and regulations.
Financial Management Standards – State-Mandated Cost
The college has procedures that
provide for the appropriate over-
sight and management of mandated
cost claim reimbursement filing.
Appropriate procedures cover: the
identification of changes to existing
mandates; training staff regard-
21.1 2 2 3 4 7 7 8 7 7 7 7
ing the appropriate collection and
submission of data to support the
filing of the mandated costs claims;
forms, formats, and time lines for
reporting mandated cost informa-
tion; and review of data and prepa-
ration of the actual claims.
ACCJC Standard III 17
18 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 1.1 – Internal Control Environment
Professional Standard:
Integrity and ethical behavior is the product of the college’s ethical and behavioral standards, how
they are communicated, and how they are reinforced in practice. All management-level personnel
exhibit high integrity and ethical values in carrying out their responsibilities and directing the work
of others.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has established board policy and administrative regulations addressing the re-
quirements of board members and certain identified administrative staff for disclosing per-
sonal activities that may present a conflict of interest while exercising the duties of their posi-
tion. Board Policy (BP) 2710, Conflict of Interest, dated December 15, 2009, addresses the
limitations and disclosure requirements of board members and other district employees where
personal activity or financial interest has or may have an effect that is in conflict or incompat-
ible with their duties as officers of the district. Administrative Regulation (AR) 2711, Conflict
of Interest Disclosure, dated December 15, 2009, describes in detail the general requirements,
designated employee positions, disclosure categories, gifts and honoraria. Each section of the
AR places the highest priority on honesty and integrity in all public and personal relation-
ships by board members and senior administrators, and further extends to construction con-
sultants. Ensuring annual compliance with this policy and administrative regulation demon-
strates the district’s ongoing commitment to enhance its ethical and behavioral standards and
provides a strong basis for an internal control environment that is conducive to preventing
fraud, misappropriation of funds and other illegal activities.
2. The Compton CCD special trustee and provost/CEO continue their commitment and dili-
gence to ensure organizational expectations are communicated regularly to employees. Con-
sistent integrity and ethical behavior by management sets the organizational expectations,
provides the necessary leadership for all staff and creates an environment of high ethical and
moral value. The continuing leadership demonstrated by the provost/CEO and CBO provides
an ongoing sense of stability for staff. Staff expressed that they clearly understand the admin-
istration’s expectations of them, and management-level personnel are actively involved in di-
recting and overseeing the work of staff in the Business Services Department. Staff members
continue to speak highly of the leadership.
3. The district continues to routinely review and update board policy and administrative regula-
tions. Several years ago the administrative team established a goal to review 15 or more each
year, and FCMAT found continued progress in this area based on interviews, review of dis-
trict communications, and updated board policies and administrative regulations. The district
should continue efforts to ensure that all board policies and administrative regulations are
routinely reviewed, updated, developed and implemented; and the continued development
of operational procedures should also occur to strengthen policy effectiveness. The district
should ensure staff are informed and trained in all areas of change that affect their areas of
responsibility.
ACCJC Standard III 19
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 6
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
20 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 1.4 – Internal Control Environment
Professional Standard:
The organizational structure clearly identifies key areas of authority and responsibility. Reporting
lines are clearly identified and logical within each area.
Progress on Implementing the Recommendations of the Recovery Plan:
1. An organizational structure that provides clearly defined lines of authority significantly en-
hances internal control. Accountability is a critical component of an effective control envi-
ronment and is established through organizational structure and effective communication.
Assembly Bill (AB) 318 set forth the parameters of the partnership between El Camino CCD
and Compton CCD and created the Compton Center. The El Camino College Compton Cen-
ter operates as a center of El Camino Community College and, under the partnership, pro-
vides accredited courses for instruction. El Camino CCD provides oversight and management
of the instructional programs and supporting services.
FCMAT was provided with an organizational chart for 2015-16, dated February 11, 2016, re-
flecting minimal change to the organizational structure since the last report, such as changes
in title for a few positions. Each division in the organizational chart is subdivided into its
supporting departments. This chart provides direction for management and support staff by
documenting clear lines of authority.
AR 3101, Management Organization Chart, issued March 15, 2010, does not reflect the dis-
trict’s most up-to-date organizational chart. The chart in AR 3101 should be updated to reflect
the actual structural delineation, lines of authority and reporting to the Compton CCD pro-
vost/CEO and El Camino CCD or the regulation should be revised so that it does not incor-
porate such detail.
2. Employees interviewed continued to indicate that they understand the organizational report-
ing structure for communication and the appropriate chain of command.
3. Continuity of staff in the CBO and director of accounting positions continued in this review
period, allowing the district to maintain a strong, consistent leadership team in the Business
Services Department. The ongoing stability in department leadership continues to strengthen
the ability to provide high quality services.
4. Under the governance structure and partnership agreement, El Camino CCD continues to
provide oversight to the Compton Center as necessary to help ensure Compton CCD’s fiscal
recovery, and will assist with compliance efforts and progress toward accreditation for the
center. Senior management of the El Camino CCD continue to report high levels of confi-
dence in the Compton CCD leadership team. The working relationships between the two in-
stitutions continue to be positive as a result of the consistency and strength of the leadership
team.
ACCJC Standard III 21
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
22 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 1.7 – Internal Control Environment
Professional Standard:
All employees are evaluated on performance at least annually by a management-level employee
knowledgeable about their work product. The evaluation criteria are clearly communicated and, to
the extent possible, measurable. The evaluation includes a follow-up on prior performance issues and
establishes goals to improve future performance.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has established and continues to use systematic evaluation instruments for all
employee groups. For faculty, two evaluation formats have been established and agreed upon
including a standard evaluation and a special evaluation. The format and frequency of certifi-
cated staff evaluations depend on the position held, the duration of time in the position and
other circumstantial factors.
The foundation for the classified employee evaluation is established by the personnel com-
mission and outlined in the Rules and Regulations of the Classified Service. This document
specifies the frequency and timing of classified employee performance evaluations, the
responsible party for providing evaluations, procedures for completion and the appeals pro-
cess if the employee is not satisfied with the evaluation. Further information is provided in
the Guide to Evaluation of Performance in the Classified Service document prepared by the
Compton CCD Human Resources Department. The classified evaluation document is a basic
tool for assessing employees’ performance related to quantity and quality of work, judgment,
working relations, initiative, dependability and reliability, attendance and punctuality, safety
and communication skills.
The management evaluation document includes templates for basic, comprehensive and ad-
ministrative evaluations. This standardized framework provides the necessary guidance for
managers and ensures that the district’s overarching goals are addressed in the process. Per-
formance evaluations are required annually for all management and classified employees.
2. The Human Resources Department continues to manage the annual evaluation process,
which is initiated each year through communications with management. A memo is sent to
administrators and managers each March along with a list of employees to be evaluated.
The review team selected and reviewed a sample of employee evaluations and continues to
observe instances where the evaluator addresses specific areas of improvement and provides
measurable goals to attain satisfactory results on future evaluations. At the time of FCMAT’s
fieldwork, evaluations for the May 2015 review period had been completed and lists and
communications had been distributed for the 2016 evaluation cycle. The district continues
to meet the required timeframe for most employee evaluations. Timely, consistent execution
of evaluations is essential to guide employees in meeting the duties and responsibilities of
their positions as outlined in their job description. Employee evaluations serve as a tool for
addressing areas of weakness in performance and to acknowledge and encourage progress.
District leaders understand their roles and the need to move through the appropriate stages
of the evaluation process when performance weaknesses are identified but are consistently
ACCJC Standard III 23
challenged by competing priorities on their time. Regular training regarding best practices for
completing employee evaluations should continue.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
24 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 1.8 – Internal Control Environment
Professional Standard:
Top management sets the tone and establishes the environment. Therefore, appropriate measures are
implemented to discourage and detect fraud.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The solidification of the management hierarchy continues to improve the effectiveness
and efficiency of management oversight of employees and their work. The recognition by
staff and faculty of the management hierarchy in execution and oversight of daily staff as-
signments continues to demonstrate the expectation of high integrity and ethical behavior
throughout the organization.
2. The CBO continues to assume the Business Services Department’s leadership role and man-
ages some routine tasks focused on budget development, financial projections and facilities
accounting. The director of accounting is primarily focused on financial accounting aspects
of the department and continues to provide technical assistance and guidance to staff. Depart-
ment staff continue to report that while they work more closely with the director, the CBO
remains involved in daily operations and provides leadership to the management team.
3. The primary objective for management is to achieve effective internal controls and include
reasonable assurance that:
a. Compliance with policies, procedures, plans, laws and regulations is achieved
b. Assets are safeguarded against theft and/or loss
c. Financial information is accurate and reliable
d. Financial and operational information is timely
e. Resources are used effectively, efficiently and economically
f. Established operational and programmatic goals and objectives are met
To meet this objective, written operational policies and procedures for business office func-
tions continue to be developed, although the number of new procedures being developed has
decreased.
4. Formal operational policies and procedures help to establish protocols for the completion, re-
view and oversight process of each function in the business office. When properly designed,
implemented and followed, written procedures improve the effectiveness of the internal con-
trol structure and offer reasonable assurance that occurrences of fraud will be avoided. Modi-
fications to procedures or standardized forms continue as needed. Communication and staff
training are essential to the successful implementation of procedural changes. Employees are
not consistently informed and familiar with modified procedures and forms as changes take
place.
5. While all employees have some degree of responsibility for the district’s internal controls,
management is ultimately responsible for detecting fraud. Each member of the management
team should be familiar with the signs of fraud. Although the CBO is responsible for ensur-
ACCJC Standard III 25
ing proper internal controls are established and procedures are implemented in the Business
Services Department to properly safeguard assets, the district should not rely solely on this
position to identify and prevent fraud or other illegal activities.
During this review period, the district formed an Audit Committee independent of the busi-
ness office that reports to the provost/CEO. The 2015-2016 Standing Committees document
states that purpose of this committee is to “… periodically report to the Board the status of
previous district audit, special audit, and internal audit recommendations.” The district also
engaged in independent reviews of two areas in the business office through a consultant
agreement with an independent certified public accountant/certified fraud examiner. The first
independent review was designed to assess operational procedures of the Bursar’s Office and
the second review focused on an assessment of the district’s payroll services. The results of
these two reports were scheduled to be reviewed by the Audit Committee at its February and
May 2016 meetings; however, minutes from the February 2, 2016 meeting were not provided
to FCMAT to confirm that discussion had occurred.
6. Establishing and maintaining a fraud prevention program is essential in fraud deterrence. The
district adopted Administrative Regulation 7701, Whistleblower Reporting Protocols, Sep-
tember 6, 2013, outlining the CEO’s procedures if unlawful incidents are suspected of district
employees in the performance of their duties. This regulation establishes processes for re-
sponding to and investigating reports of unlawful activities, as defined in Board Policy 7700,
Whistleblower Protection, adopted June 8, 2010. The policy also addresses how complaints
of retaliation for making such reports are to be handled.
7. The district’s fraud prevention program continues to include a fraud hot line, which allows
anonymous tips about potential fraud. Although the administration remains committed to in-
creasing awareness throughout the district of the WeTip program, FCMAT’s observations in-
dicated that posters promoting the program throughout the campus have been limited during
the past two reviews. Program promotion through multiple postings throughout the campus,
including department and student notice boards, would help create program awareness and
convey a higher level of focus by the administration regarding fraud prevention. The WeTip
flyer can also be accessed by going to the district’s website.
8. Compton CCD continues to work to discourage and detect fraud by developing and imple-
menting applicable policies and procedures. Ongoing efforts by the leadership in the business
office to provide effective oversight, review, training, and reinforcement of proper internal
controls and operational procedures helps to provide reasonable assurance that the district’s
operations are effective, efficient and sound, and that the financial information is reliable.
26 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 1
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 27
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 2.1 – Inter- and Intra-Departmental
Communications
Professional Standard:
The business and operations departments communicate regularly with internal staff and all user
departments on their responsibilities for accounting procedures and internal controls. The communi-
cations are written whenever possible, particularly when they (1) affect many staff or user groups, (2)
are issues of high importance, or (3) reflect a change in procedures. Procedures manuals are neces-
sary for the communication of responsibilities. The departments also are responsive to user depart-
ment needs, thus encouraging a free exchange of information between the two (excluding items of a
confidential nature).
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Business Services Department continues to communicate with internal staff and user
departments on their responsibilities for accounting procedures and internal controls in vary-
ing ways and at varying times throughout the year. Internally, the leadership team continues
to develop and document procedures for routine accounting activities and generally incor-
porates participation in that development by those staff members directly responsible for the
task.
Documented procedures for routine tasks in the business office, including those managed by
senior accounting staff, are assisting in communicating changes, identifying intersections
with other tasks and providing reference resources to help guide staff through the learning
process when duties are reassigned. Additionally, collaboration among business office staff in
advance of changes could assist in identifying factors not considered prior to implementation
and help alleviate frustrations experienced by staff that may not have been aware that any
change affecting their work took place.
2. FCMAT reviewed several documents designed to provide information to employees and oth-
ers on changes to board policy and business procedures established to strengthen internal
controls. Among items reviewed were memorandums, emails and other communications that
demonstrate efforts to inform and train internal staff and external departments on new or re-
vised business procedures and responsibilities, and revisions to board policy and administra-
tive regulations that affect financial areas. Although the CBO reviews the development and/or
revision of board policy and administrative regulations that affect accounting procedures and
internal controls, staff continue to report that not all changes are routinely communicated to
employees.
3. The district does not maintain institutional (desk) procedure manuals for day-to-day tasks
in the Business Services Department, but rather utilizes an internal network shared drive to
retain electronic versions of established and draft processes and procedures, which are acces-
sible to all Business Services staff.
4. Stability in the business office leadership team continues during this review period. Focus
on the development of documented processes and procedures for day-to-day operations con-
28 ACCJC Standard III
tinues as weaknesses in established processes are identified. Some minor shift in roles and
responsibilities have occurred in the Business Services Department with the addition of two
new staff members over the last 18 months.
5. Interviews with staff identified mixed opinions regarding the level of communications within
the business office and between the business office and other departments. Although internal
staff reported that they feel they understand their responsibilities, lines of authority and re-
sources available to them, some continue to express a desire for more departmentwide collab-
oration. Weaknesses continue in communicating details that affect multiple tasks, including
those associated with account coding for salaries and benefits between positions managed by
the Human Resources Department and budget and payroll managed by the Business Services
Department. Inadequate or untimely communication of changes, such as proper account code
assignment for personnel, results in reclassification entries and/or budget revisions, which in
turn contributes to operational inefficiencies. These circumstances can also make it difficult
for departments to effectively monitor and manage their budgets. The Business Services De-
partment should conduct routine department meetings to aid in mitigating these weaknesses.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 6
April 2013 Rating: 7
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 29
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 2.2 – Inter- and Intra-Departmental
Communications
Professional Standard:
The financial departments communicate regularly with the Governing Board and community on the
status of college finances and the financial impact of proposed expenditure decisions. The communi-
cations are written whenever possible, particularly when they affect many community members, are
issues of high importance to the college and board, or reflect a change in policy.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The CBO routinely provides the provost/CEO with a high level overview of state budget
factors at each significant point in the fiscal cycle, including the January presentation of the
governor’s proposed state budget, May revision and final budget assumptions and the general
effect each has on the district. Additionally, the CBO presents quarterly and annual financial
status reports at board meetings throughout the fiscal year. While greater detail may be pro-
vided verbally during presentations, reports provided to the board/special trustee in board
agenda materials or accessible through web links are generally summarized. Although some
factors used to provide the basis of foundational calculations are present, the details support-
ing significant revenue and expenditure projections are lacking. Financial reports should pro-
vide the assumptions used as the foundation for budget development and financial projections
and the details associated with significant financial changes or variances from one period to
the next. Materials prepared to communicate fiscal status to the board/special trustee should
clearly communicate the essential details contained in reports and projections.
Board meeting agendas include items such as the quarterly and annual financial status re-
ports, which are presented as discussion/information items to the board. The board minutes
reflect that items are reviewed and discussed.
2. The district’s Business Services Department regularly presents purchase orders, stale dated
checks, and budget transfers/augmentations to the board/special trustee for approval, with
purchase orders and stale dated checks appearing as consent items on the board agendas. The
documentation for budget transfers/augmentations continues to provide the rationale for their
necessity and when presented as action items, facilitates board discussion.
3. The district continues to provide the board with routine updates for facilities planning and de-
velopment including those projects funded with Measure CC and Proposition 39 bond funds.
Board meeting minutes and supplemental documentation provide descriptive and financial
details for most items presented. However, bond expenditure reports lack detail including
narrative support to provide the user with any information associated with the item presented.
The district should ensure narrative detail related to significant changes accompanies finan-
cial updates.
4. The district uses several forums to disseminate and discuss information pertaining to its fi-
nancial activities, including the financial impact of proposed expenditure assumptions and
decisions. Among these forums are the Planning and Budget Committee that serves as the
30 ACCJC Standard III
steering committee for campuswide financial planning and budget development; the Special
Trustee’s Advisory Committee, which advises the special trustee regarding the management
of the district; and the Bond Oversight Committee, which informs the public concerning the
district’s expenditure of revenue received from the sale of voter-authorized bonds. Each com-
mittee plays an integral role in obtaining, considering, questioning, understanding and com-
municating information regarding fiscal aspects of the district.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 5
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 31
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 2.4 – Inter- and Intra-Departmental
Communications
Professional Standard:
The college has formal policies and procedures that provide a mechanism for individuals to report
illegal acts, establish to whom illegal acts should be reported, and provide a formal investigative
process.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has adopted policies and administrative regulations that establish district orga-
nizational hierarchy and increase the resistance to fraud including: organizational structure,
access to facilities and property, delegation of authority, procurement, asset security and ac-
counting, reporting of crimes and an annual external audit.
2. The district adopted BP 7700, Whistleblower Protection, on June 8, 2010 that requires the
CEO to establish regulations regarding the reporting and investigation of suspected fraudu-
lent activities and provides protection from retaliation for those who make such reports in
good faith and/or assist in the investigation of such reports.
3. BP 7700 references AR 7701, Whistleblower Reporting Protocols, which was issued Sep-
tember 6, 2013 and encourages and provides guidance to individuals to report suspected inci-
dents of unlawful activities, including the steps for reporting suspected acts and assurances to
protect those who report from retaliation. The AR also provides for an investigative process
and lists alternative agencies an employee may contact that are external to the district, includ-
ing the State Auditor’s Whistleblower Hotline, Bureau of State Audits and the California De-
partment of Insurance Fraud Division. These procedures solidify the established methods for
reporting inappropriate activities.
4. The district adopted BP 8400, Reporting of Crimes, on October 20, 2009 that requires the
CEO to ensure, as required by law, that reports are prepared of all crimes committed on
campus and reported to campus police, as well as arrests made for the same, that involve
violence, hate violence, theft or destruction of property, illegal drugs, or alcohol intoxication.
The policy requires the CEO to ensure that “required reports of non-criminal acts of hate vio-
lence are prepared” and made available as required by law, and indicates that the crime report
information will be collected and distributed annually.
5. The CBO continues to communicate to the campus community regarding the district’s estab-
lished whistleblower reporting protocols for individuals to follow if they suspect incidents of
unlawful activities by district employees in the performance of their duties. A memorandum
from the CBO dated February 24, 2016 encourages staff members to read AR 7701, Whistle-
blower Reporting Protocols, and provides a website link to the regulation. The memo also
reminds staff of the We-Tip program, and provides the phone number to call to anonymously
report information of any unlawful activity. A link was also provided to the We-Tip website,
where crimes such as academic fraud, drugs/illegal substance, workers’ compensation fraud,
discrimination, harassment, threats, safety violations, burglary and weapons can be reported.
32 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating 5
June 2012 Rating: 3
April 2013 Rating: 5
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 33
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 2.5 – Inter- and Intra-Departmental
Communications
Professional Standard:
Documents developed by the financial departments for distribution to the board, staff and commu-
nity are easily understood.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues to provide routine financial reports in many forums including meetings
with the provost/CEO, state trustee, board of trustees, cabinet, Planning and Budget Com-
mittee, and for many purposes including budget development study sessions, negotiations,
financial projections, project reporting and analysis. The details of materials presented are
generally appropriate for the forums for which they are intended. Budget and financial infor-
mation is consistent in structure, generally reported by fund and summarized by object code,
and is commonly accompanied by basic revenue and expense assumptions. Financial infor-
mation for the unrestricted and restricted resources is presented separately in the proposed
and final budgets for consideration and approval. Financial data for fiscal years is presented
in three columns: one presenting financial data for the last fiscal year completed and audited,
one presenting estimated or unaudited year-end projections for the fiscal year under way,
and one for the fiscal year under development. Greater object code detail is provided in the
tentative budget, while amounts are presented by major object code in the final budget. De-
tailed district assumptions, projections, goals and plans are essential to providing readers a
clear understanding of the basis of financial projections. Although some details are provided
in the introductory overview of assumptions, tying those figures back to the final numbers
presented continues to be challenging as complete detail is lacking. A summary of significant
changes presented by major object code would help readers to interpret the changes in budget
amounts from one period to the next.
2. Generally, budget development is a collaborative effort, with contributions from the provost/
CEO, CBO, cabinet members, Planning and Budget Committee, Consultative Council, and
some departments, all of whom work to define and develop the assumptions and details of
the tentative budget. The district continues to meet regularly with the Planning and Budget
Committee, which is comprised of members from management, faculty, staff and student
groups. Discussion items include current budget, future budget, facility issues, enrollment
plans, overarching goals, budget assumptions and other business topics as determined by the
committee. Meeting minutes indicate that the CBO actively presents budget and financial
information to committee members and encourages dialogue and input; committee members
review the content of budget materials and make inquiries demonstrating active participation;
responses are provided where clarity is needed; and when necessary, matters that require ad-
ditional research are brought back for further discussion at subsequent meetings.
3. The documents distributed by the business office to committee and advisory board members
continue to be in a narrative or spreadsheet format. To increase involvement and understand-
ing, it is a best practice to use visual presentations, including graphs and charts to help those
unfamiliar with the fiscal environment to more easily understand the budget and fiscal issues.
34 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 35
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 4.1 – Internal Audit
Professional Standard:
The Governing Board has adopted policies establishing an internal audit function that reports direct-
ly to the president or Governing Board.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district revised Administrative Regulation 6401, Audits, on November 17, 2015. Revi-
sions to this administrative regulation incorporated the authorization for the CEO to “… call
for a special audit or internal audit whenever the best interest of the district will be served.”
It further states that the “CEO shall establish an audit committee to review the annual district
audit, special audit, and internal audit reports.” The regulation indicates that the Audit Com-
mittee reports to the board the status of audit recommendations, implying it is their role to
follow up on deficiencies noted in those reports.
During this review period, the district established an Audit Committee to review the annual
district audit, special audit, and internal audit reports and periodically report the status of
audit recommendations to the board/special trustee. This was done in an effort to implement
FCMAT’s recommendation regarding establishing and monitoring proper internal controls in
key operational areas including the business office, Bursar’s Office, financial aid, categorical
programs and state and federal grants. The Audit Committee reports directly to the provost/
CEO and includes representatives from the management, faculty and staff constituent groups;
student representatives have not yet been assigned to the committee. Audit Committee meet-
ings are scheduled approximately once per quarter and special sessions can be calendared if
deemed necessary. The initial meeting occurred December 8, 2015.
2. Although the district does not employ an internal audit position, it remains a priority of the
district to ensure that sound internal controls are established, reviewed, and monitored to de-
ter and prevent material misstatement. The district and the provost/CEO remain committed to
fostering an environment and culture that clearly communicates that fraud and other illegal
acts will not be tolerated and that all allegations will be investigated. While the district ac-
knowledges the importance of the internal audit function, an alternative approach to meeting
this objective has been implemented as opposed to staffing a position dedicated to this pur-
pose. The district has chosen to outsource some of the duties traditionally managed through
the internal audit function. Additionally, the CBO and director of accounting actively review
and monitor operational areas and make adjustments to procedures where improvement in
internal controls is deemed necessary to address system weaknesses.
3. The district hired an independent external auditor to conduct a review and analysis of the
Bursar’s Office internal control system for cash collections, evaluate the system for weak-
nesses and susceptibility to potential misappropriation, and propose improvements where ap-
plicable. That review occurred in April 2015, and review of the report was listed as an agenda
item for the February 2, 2016 Audit Committee meeting. FCMAT was not provided with
minutes for that meeting.
36 ACCJC Standard III
The district also hired the same independent external auditor to conduct a review and analysis of the
payroll department’s internal control system. That review and analysis was conducted during this re-
view period and was included on the February 2, 2015 Audit Committee meeting agenda for a status
discussion. Interviews indicated that the report had been completed but not yet released at the time of
FCMAT’s fieldwork.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 4
June 2009 Rating: 8
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 1
April 2013 Rating: 3
April 2014 Rating: 4
April 2015 Rating: 4
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 37
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 4.4 – Internal Audit
Professional Standard:
Internal audit findings are reported on a timely basis to the Governing Board and administration, as
appropriate. Management then takes timely action to follow up and resolve audit findings.
Progress on Implementing the Recommendations of the Recovery Plan:
1. In June 2013 an Internal Operations Review Plan was designed to identify existing internal
controls and monitor and update processes and procedures in the district business office. The
original list ranked areas of risk as priority 1-4, with 1 requiring immediate attention within
six months; 2, immediate attention within 12 months; 3, attention within 18 months; and 4,
attention within 24 months. Although a status update of initial priorities was developed in
June 2014, the district has not updated the priorities list to identify new areas of focus since
the plan was released on June 30, 2013.
Although this plan has not been updated to incorporate newly identified items, the district
has continued efforts to conduct reviews in some areas, including a recent study pertaining to
payroll.
2. Although the district does not staff an internal audit position, it has engaged external profes-
sional services to assist in mitigating fraud risk and identifying control weaknesses in specific
areas over the last year, specifically the Bursar’s Office and the payroll department, as discussed
in Standard 4.1. Interviews with staff indicated the district plans to present all findings and in-
ternal control weaknesses identified in these reviews to the Audit Committee. Actions taken to
mitigate findings identified in the reviews should be clearly documented and communicated to
affected staff members, cabinet, the Audit Committee and the board of trustees/special trustee.
3. The district should continue efforts focused on routinely reviewing and monitoring systems
and procedures established to identify weaknesses in the internal control structure. Follow-
through in the development of processes and procedures that mitigate identified weaknesses
is essential, ultimately reducing the risk of loss to the district.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 0
April 2013 Rating: 3
April 2014 Rating: 4
April 2015 Rating: 4
April 2016 Rating: 5
38 ACCJC Standard III
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 39
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 5.1 – Budget Development Process
(Policy)
Professional Standard:
The budget development process requires a policy-oriented focus by the Governing Board to develop
an expenditure plan that fulfills the college’s goals and objectives. The Governing Board focuses
on expenditure standards and formulas that meet the college’s goals. The Governing Board avoids
specific line-item focus, but directs staff to design an entire expenditure plan focusing on student and
college needs.
Progress on Implementing the Recommendations of the Recovery Plan:
1. BP 6200, Budget Preparation, was revised and approved by the board/special trustee on Janu-
ary 20, 2015 (the district’s website shows a prior revision date of October 24, 2014). The
revised policy includes an increase in the unrestricted general fund reserve from 5% to 10%.
This policy provides that the CEO solicit recommendations from the cabinet and Planning
and Budget Committee, and that the budget development process include:
• Support of the district’s master and educational plans
• Budget assumptions presented to the board for review
• Budget projections that address long-term goals and commitments
Board policy also mandates budget study sessions to be scheduled for board members and
a public hearing to be scheduled “in which interested persons may appear and address the
Board regarding the proposed budget or any item in the proposed budget.”
The accompanying administrative regulation, AR 6201, Budget Calendar, states that the CEO
directs that the budget for each fiscal year be prepared within a defined process and timeline
with various phases for preliminary budget development to final budget adoption. Budget as-
sumptions must be finalized by January 31 with a narrative that describes the overall goals
and objectives of the district that have primary consideration in the budget development pro-
cess. In accordance with AR 6201, the assumptions shall include:
• Forecast beginning balance and directions regarding the goals and objectives for the end-
ing balance
• Projection for cost of living adjustment
• Forecasts for full-time equivalent students, full-time equivalent faculty and revenue
• Forecast and impact of collective bargaining
• Standardized formulas and ratios to be used in allocating funding among departments
• Assumptions about and material changes in the district’s debt capacity and the commu-
nity’s capacity for general obligation bonds
• Guidance regarding drawing down the line of credit
40 ACCJC Standard III
2. Minutes of the Planning and Budget Committee dated March 2015 through September 2015
indicate the committee’s recommendations were solicited by the district at many points in the
2015-16 budget development process, including the review of overarching priorities, budget
assumptions, tentative budget and five-year fiscal management plan.
A 2015-16 budget workshop was held for the governing board on April 28, 2015 and in-
cluded a presentation of the tentative budget assumptions. A tentative budget for the 2015-16
fiscal year was presented to the board/special trustee for approval at the June 16, 2015 board
meeting. Final budget assumptions were presented to the board/special trustee on August
18, 2015, and the district’s 2015-16 final budget was presented for approval on September 8,
2015. Board minutes for both the tentative and final budget reflect that the hearing was prop-
erly noticed on the previous agenda and the regular meeting adjourned for the public hearing
as required by the California Code of Regulations Title 5, Sections 58301 and 58305; meet-
ing minutes reflect that there were no audience comments but do not consistently include the
times hearings are opened and closed. The presentation of both the tentative and final budgets
included budget assumptions with a multiyear financial analysis that included one historical
year (2013-14), projected current year (2014-15) and budget for new year (2015-16).
During the October 20, 2015 board meeting, a five-year fiscal management plan was present-
ed for discussion and approval.
3. Minutes indicate that during the October 20, 2015 board meeting, the special trustee dis-
cussed the 2015 Elected Board of Trustees’ Goals. These goals include a section for fiscal
responsibilities to study, review and provide input on the 2015-16 budget; study and review
the 2014-15 audit report; monitor the 2015-16 budget; and to study and be responsive to the
impact of fiscal changes that may occur nationally, locally, and/or at the state level.
4. To make further progress in this standard, the district needs to ensure it follows the process
and timeline provided in AR 6201.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 3
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 7
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 41
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 5.3 – Budget Development Process
(Policy)
Professional Standard:
Policies and regulations exist regarding budget development and monitoring.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The revised BP 6200 describes the budget development process and establishes that the an-
nual budget “shall support the District’s master and educational plans.” The policy reflects
the establishment of an unrestricted general fund reserve of 10%, doubling the California
Community Colleges Chancellor’s Office recommended reserve level of not less than 5%.
2. Budget management is the responsibility of the CEO in accordance with BP 6250 and AR
6251. This policy requires board approval for changes between major object code classifica-
tions. A review of agenda items for regularly scheduled board meetings indicates that they
reflect the approval of budget transfers with supporting documentation.
3. BP 6300 provides for fiscal management in accordance with principles contained in the Cali-
fornia Code of Regulations, Title 5, Section 58311 and the California Community Colleges
Budget and Accounting Manual.
Standard Implemented: Fully - Sustained
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 0
June 2009 Rating: 6
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
42 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standards 5.4 and 5.6 – Budget Development
Process (Policy)
Professional Standard:
Standard 5.4: The college has a clear process to analyze resources and allocations to ensure that they
are aligned with strategic planning objectives and that the budget reflects college priorities.
Standard 5.6: Categorical funds are an integral part of the budget process and have been integrated
into the entire budget development. The revenues and expenditures for categorical programs are
reviewed and evaluated in the same manner as unrestricted general fund revenues and expenditures.
Categorical program development is integrated with the college’s goals and is used to respond to
specific college student needs to support student learning outcomes.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD has established board policies, administrative regulations and written docu-
mentation that facilitate budget development and allocates resources in alignment with dis-
trict goals and objectives.
2. The budget development process is well developed with supporting documentation to guide
the process in board policy and department manuals. Individual unit plans are submitted to
department deans for review, and deans work with the provost/CEO and/or vice president
prior to submission of the plans to the Planning and Budget Committee and Consultative
Council for information and review. The provost/CEO consults with the special trustee before
final approval.
3. The Planning and Budget Committee reviews unit and area plans to ensure proper alignment
with overarching district goals and objectives. The district continues to use a web-based
interactive data-driven software program, TracDat, to align organizational goals and objec-
tives with budget augmentations, including allocations of one-time funding, for each unit and
department. TracDat allows faculty and staff the ability to make the connection between rec-
ommendations from the program review process and annual planning. Although the extent of
use is inconsistent between departments, the software provides quantitative measurements for
outcomes and the ability to take action for improvement in a timely fashion.
4. Categorical funds are budgeted at a base level in the tentative and final budgets, with adjust-
ments made when augmentations are received throughout the year. While categorical expen-
ditures associated with annual planning objectives may be included in TracDat, other budget
details are developed by the division managers and deans with the assistance of the vice
president and the Business Services accountant. Budget revision occurs throughout the year
when new augmentations are received or budget transfers are required for expenditures. The
business office requires budget augmentation requests to be entered in TracDat for review
and approval.
ACCJC Standard III 43
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 4
April 2013 Rating: 4
April 2014 Rating: 4
April 2015 Rating: 5
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
44 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 6.1 – Budget Development Process
(Technical)
Professional Standard:
The Budget Office has a technical process to build the preliminary budget amounts that includes: the
forecast of revenues, the verification and projection of expenditures, the identification of known car-
ryovers and accruals and the inclusion of concluded expenditure plans. The process clearly identifies
the sources and uses of funds. Reasonable FTES and COLA estimates are used when planning and
budgeting. The same process is applied to all funds.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The CBO has primary responsibility to prepare initial projections of revenue for the gen-
eral operating budget. The process begins with a calculation of full-time equivalent students
(FTES) and cost of living adjustment (COLA) estimates from the Governor’s January budget
proposal. The budget assumptions for the 2015-16 tentative budget were presented at the
April 28, 2015 budget workshop special board meeting. After the state budget had been ap-
proved, the assumptions were updated and included in the final budget, which was approved
September 8, 2015.
In the prior review period, the administrative team reported that enrollment was a priority
and concentrated efforts were under way to examine student enrollment data. For the 2014-
15 final budget, enrollment increased but the number of classes per student decreased, caus-
ing a reduction in FTES of approximately 500. According to data analyzed by the provost/
CEO, approximately 40% of students were taking six units or less. The district anticipated
borrowing 500 FTES from summer 2015 to balance the 2014-15 fiscal year, for a total FTES
of 5,716. Excluding plans to borrow FTES, actual 2014-15 FTES were 16.5% lower than the
estimate of 6,251 contained in the 2014-15 final budget. The district received stability fund-
ing under CCR Title 5, Section 58776 in 2014-15 based on the prior year FTES, an increase
of 844 FTES.
In the 2015-16 final budget, administration estimated 5,216 FTES with the expectation that
the district would receive stability funding to previously projected 2014-15 FTES levels.
Since that time, the administration revised the 2015-16 estimate to 5,505 with plans to bor-
row FTES from summer 2016 to achieve funding of 6,060 FTES.
The provost/CEO plans to stabilize FTES by 2016-17 by attracting more students to gener-
ate more revenue. Two new programs will be added to the list of class offerings: cosmetol-
ogy and a fire academy. An ongoing partnership with the local K-12 school district, started in
fall 2015, allows high school students to earn their AA degree concurrently with high school
graduation and generate additional FTES.
2. The CBO and budget analyst are primarily responsible for budget development with assis-
tance from the accountant for categorical funds. The CBO prepares department allocations
for initial distribution. The budget analyst, CBO and accountant complete the input process in
the financial software.
ACCJC Standard III 45
The provost/CEO recognizes that the budget process is evolving and that more needs to be
done to incorporate approved unit plans that link to the district’s overarching goals and ob-
jectives into the final budget. The CBO, hired in 2012, has provided stability in the Business
Services Department; however, the budget process should include cross-training of other
department personnel such as the director of accounting and/or the accounting supervisor
positions. The district should also consider involving more staff members in the process, par-
ticularly with the projection of expenditures and the inclusion of expenditure plans.
3. As indicated in previous review periods, the district should include assumptions for all funds
in the narrative section of the tentative and final budgets. In addition, the district has respon-
sibility over Associated Student Body funds, which should be an integral component of the
budget process and presentation.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 4
April 2014 Rating: 4
April 2015 Rating: 4
April 2016 Rating: 4
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
46 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 7.5 – Budget Adoption, Reporting,
and Audits
Professional Standard:
The quarterly fiscal status reports show an accurate projection of the ending fund balance. Material
differences are presented to the Governing Board with detailed explanations.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Quarterly financial status reports presented to the board/special trustee during this review
period continue to lack detailed explanations for large variances that occur in revenues, other
financing sources, expenditures, other outgo and cash borrowing. While simplicity of infor-
mation is often preferred for presentation purposes, the district would benefit from providing
greater detail in the back-up documentation and speaking to the significant changes in pre-
sentations. For example, the most recent reporting periods in 2015-16 from September 30,
2015 to December 31, 2015 showed an increase in unrestricted revenues of $944,913 and an
increase in unrestricted expenditures of $119,409 with no explanation for the change.
2. The quarterly financial status reports demonstrate under-projection of the ending fund bal-
ance. The Q4 report accurately projects the ending fund balance, but the variance between the
Q3 and Q4 reports is a 37.5% increase. Variance between Q1, Q2 and Q3 reports is a maxi-
mum of 6%, indicating that the ending fund balance is understated until actual data is known.
Although conservative projections are prudent, overly conservative projections may limit the
district’s ability to make timely financial decisions.
3. The district should communicate quarterly financial statement variances and changes to the
board/special trustee and ensure that presentation materials, supporting documentation and
detailed narratives accompany all reports and are made available in the board agendas and
other financial links on the district’s website.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 4
April 2013 Rating: 4
April 2014 Rating: 4
April 2015 Rating: 5
April 2016 Rating: 5
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 47
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 8.2 – Budget Monitoring
Professional Standard:
There are budget monitoring controls, such as periodic reports, to alert department and site manag-
ers of the potential for over-expenditure of budgeted amounts. Revenue and expenditures are forecast
and verified monthly.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Business Services manual has comprehensive budget development and monitoring
guidelines, including a section that defines specific processes for budget tracking, mainte-
nance and monitoring throughout the year. The manual identifies departmental employees
responsible for budget such as deans, directors and others authorized to approve expenditures
or modify the budget (departmental budget holders). Departmental budget holders are expect-
ed to review budget status reports at least monthly from the Datatel system and report any
discrepancies to the CBO for review.
Interviews disclosed that departmental budget holders have online access to the Datatel fi-
nancial system and can review and/or print a hard copy of their budget report independently.
Departments may request financial reports from staff in the Business Services Department.
While departmental budget holders indicated they reviewed their budgets, some noted dif-
ficulties resulting from the delay in budget modifications associated with salary and benefit
distributions that are submitted to the Human Resources Department using Personnel Activity
Report (PAR) forms and the timeline for reconciliation of the district’s two financial systems.
2. Complicating the issue of budget monitoring are departments not following established pur-
chasing procedures, which require the preparation of purchase orders for expenditures. The
use of purchase orders ensures that sufficient funds are available in the budget to make each
purchase and encumber the budget prior to the purchase taking place. While the district’s fi-
nancial system blocks the creation of new requisitions if insufficient resources are available
in the budget to support the expenditure, these controls are ineffective when bypassed by
staff. Although the CBO has discussions with staff members that fail to follow district pro-
cedures, followed up by a letter outlining the process to use for future purchases, violations
continue to occur.
3. The Business Services manual states that twice each fiscal year managers are offered cam-
puswide budget review by the CBO. This has not taken place during the 2013-14, 2014-15
or 2015-16 fiscal years. The CBO and budget analyst hold managers responsible for their
budgets and monitoring their departmental reports and offer individual training/assistance as
needed on request.
4. The district uses two accounting systems, Datatel and PeopleSoft. Its partner, El Camino
CCD, requires the use of Datatel, and LACOE requires the use of PeopleSoft. The district
uses the Datatel system for budgeting and accounts payable, but the two systems do not auto-
matically reconcile and only PeopleSoft is audited by the district’s external auditors.
48 ACCJC Standard III
Routine monthly reconciliations between systems are essential to ensure that data is accu-
rately reflected in each system. However, due to the difficulties encountered in the timing of
uploads into Datatel and the extensive time necessary to perform the reconciliations monthly,
they are only completed quarterly. This is an improvement over the prior year’s biannual pro-
cess due to the hiring of an additional accountant position in the business office.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 49
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 8.5 – Budget Monitoring
Professional Standard:
The college uses an effective position control system that tracks personnel allocations and expen-
ditures. The position control system effectively establishes checks and balances between personnel
decisions and budgeted appropriations.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Position control is the system used to control and track all relevant information for all positions
approved by the board of trustees/special trustee, including the assigned pay schedule, work
days and other qualification criteria. Each approved position should be uniquely identifiable
by a position number. Each new position created and approved is set up in position control and
likewise, any position eliminated by the district (one that the district will no longer staff in the
future) should be removed from the system. Position control allows a district to track all ap-
proved positions, staffed and unstaffed. As employees are hired for a position, they are assigned
the appropriate position number. It should only be possible to commit each position number to
one full assignment, although multiple employees could be assigned a partial assignment. It is
best practice for the data maintained in the position control system to be used as the foundation
for the district’s budget and to drive payroll. Salaries and benefits are the single largest expend-i
ture in the general fund operating budget, totaling approximately 71.3% for the district in 2015-
16 according to the 2015-16 Final Budget. Thus, it is essential that the information managed in
the position control system is routinely matched to the budget and payroll data.
2. The district has adopted, revised, and implemented regulations to appropriately control and
track positions but has difficulty with the implementation of proper procedures to effectively
monitor position control. For example, the district previously used the position control re-
ports in the Human Resources System (HRS). Instead, the district has started maintaining
position control on a spreadsheet, which doesn’t provide easy access to information like the
current number of board/state trustee approved open positions. Administrative Regulation
6252 and Administrative Procedure 6252A detail the requirements for obtaining approval to
establish a new position or fill an existing position. The administrative procedures detail the
steps and workflow necessary to process the requirements and communicate the actions to
the necessary departments. The process also incorporates a check and balance system that en-
sures compliance and review of position control actions.
3. The district has implemented procedures to establish new positions that are added to the bud-
get. Interviews with district administrators and staff, however, identify a lack of appropriate
management oversight to ensure that the position control records are routinely updated and
reconciled. The director of accounting who oversees the budget analyst responsible for main-
taining position control is not familiar or involved with this function, and the CBO lacks the
time necessary to review the work. During the prior review period, interviews indicated that
the budget analyst had only recently eliminated more than 100 positions from the system that
were vacant and will remain unfilled. During the current review period, interviews indicated
that no reconciliation occurred since the prior visit. The district should compare budgeted po-
sitions with active position control records and make necessary adjustments at least annually.
50 ACCJC Standard III
4. Management staff responsible for overseeing budgets indicated they were unable to obtain
timely budget-to-actuals comparison of staffing costs. This is primarily due to the lack of in-
tegrated financial systems as information is not updated timely. The district uses two systems
for position control, Datatel and PeopleSoft. While Administrative Procedure 6252A calls for
a budget technician to perform a weekly review of the differences between the two systems,
this task is not routinely performed. Interviews with staff indicated that these systems are
reconciled quarterly. Although the district’s annual audit historically cited findings associated
with the reconciliation of the two systems, no findings were cited in the 2014-15 audit.
A reliable position control system must be maintained throughout the fiscal year to prevent
over- or under-budgeting by including only those positions that have been district-approved.
In addition, a reliable position control system prevents a district from omitting from the
budget routine annual expenses such as substitutes and estimated costs for employee salary
schedule step and/or column changes.
5. Interviews with employees indicated that the Business Services Department recognizes there
are several areas for improvement. The district should reconcile position control with records
in human resources and they should agree with budgeted salary and benefit information. The
district should continue to evaluate business office staffing and skill levels to ensure there is
enough staff and that the current staff have the training and skills necessary to accomplish the
work required.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 6
April 2013 Rating: 6
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 51
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 9.2 – Budget Communications
Professional Standard:
The college budget clearly identifies one-time sources and uses of funds.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The narratives to the budget reports presented to the board of trustees/special trustee clearly
identify one-time revenues and expenditures. These narratives provide sufficient documenta-
tion to demonstrate that the district has sustained a reliable system and process for this stan-
dard.
Standard Implemented: Fully - Sustained
April 2007 Rating: 0
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 2
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 9
April 2014 Rating: 10
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
52 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 11.1 – Attendance Accounting
Professional Standard:
An accurate record of enrollment and attendance is maintained.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has an established process for recording and reporting enrollment and attendance;
however; there is an ongoing concern regarding the accuracy of some of the reports prepared
and submitted to the state. Compton CCD’s first (P1) Estimated Enrollment Fee Revenue
report for fiscal year 2014-15 (CCFS-323) due on January 15, 2015 was submitted to the
state timely. The total estimated fees at that time were $907,745. The second (P2) Estimated
Enrollment Fee Revenue report due on April 15, 2015 was also submitted to the state timely.
The total estimated fees at that time were $850,676, a reduction in revenue of $57,069 over
the time period January to April 2015. The final Actual Enrollment Fee Revenue report due
on September 15, 2015 was submitted to the state on September 23, 2015. The total actual
fees at that time were $837,775, a reduction in revenue of $12,901 over the time period April
to June 2015.
Compton CCD’s first (P1) Estimated Enrollment Fee Revenue report for fiscal year 2015-16
(CCFS-323) due on January 15, 2016 was submitted to the state timely. The total estimated
fees at that time were $1,041,420. The second (P2) Estimated Enrollment Fee Revenue report
is due on April 15, 2016. At the time of FCMAT’s fieldwork, this report was not yet due.
Revenue for enrollment fees charged pursuant to Education Code Sections 76300 and 76140
includes fees paid and receivables recorded for courses beginning after the close of the 2014
spring term through the close of the 2015 spring term. Since this is a cumulative annualized
fiscal report, the total “fees paid” is expected to increase over the time period January to April
2015. No rationale or revised reports were provided to FCMAT to indicate the district identi-
fied and corrected errors in the reports provided for review. The procedures for completing
the CCFS-323 report should be reviewed and understood to ensure that reports are completed
properly and the state is provided accurate information. P2 for fiscal year 2015-16 was not
yet due at the time of FCMAT’s fieldwork, so analysis could not be completed as to whether
the cumulative report issues described above have been corrected.
2. A review of the 2014-15 CCFS-320 Apportionment Attendance report, Annual, showed a
total of 5,216.6 full-time equivalent students (FTES). The district goal for the fiscal year was
6,060. Three hundred and twelve FTES from summer 2014 were used in the fiscal year 2014-
15 report.
To meet the district’s goal of 6,060 FTES, the FTES Goal and Actual report shows that 749
FTES will be used from summer 2015 and 350 FTES will be borrowed from summer 2016 to
use in fiscal year 2015-16. The use of summer FTES in either fiscal year is a standard prac-
tice in California community colleges. However, continued use of this practice may result in
a deficit in summer FTES available for use in the fiscal year 2016-17.
ACCJC Standard III 53
The CCFS-320 report was due to the Chancellor’s Office on July 15, 2015, and was electron-
ically submitted on July 15, 2015 and signed by the provost/CEO on July 23, 2015. This re-
port is prepared by the El Camino CCD academic affairs analyst and is reviewed and signed
by the Compton CCD provost/CEO.
3. The Compton Center follows El Camino CCD’s student drop policy for nonpayment. Stu-
dents must pay 100% of their fees within a specified period of time or they are automatically
dropped from the class roster. In addition, the district has contracted with the Franchise Tax
Board for the California Tax Offset Program. Under the terms of the agreement, unpaid stu-
dent fees going back a number of years are automatically withheld from state refund checks.
Standard Implemented: Partially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 5
April 2013 Rating: 6
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
54 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 11.5 – Attendance Accounting
Professional Standard:
Procedures are in place to ensure that enrollment and attendance accounting and reporting require-
ments are met for weekly student contact hours (WSCH), daily student contact hours (DSCH), credit,
non-credit, high school concurrent enrollment, and positive attendance.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD utilizes El Camino CCD’s student enrollment, registration and attendance
processes, forms and systems, which are consistent with industry standards and are designed
to ensure that student attendance is accurately recorded and reported. The CCFS-320 Ap-
portionment Attendance reports are prepared by the El Camino academic affairs analyst. The
CCFS-323 Enrollment Fee Revenue reports are prepared by Compton CCD.
2. The 2014-15 Annual Financial and Budget Report, Form CCFS-311 Master Report, includes
a cover page that is to be signed and dated by the CBO and the superintendent or CEO. The
CBO and the provost/CEO signed and dated this report on October 6, 2015 and October 8,
2015, respectively. The due date for this report was October 10, 2015.
The 2014-15 311-Q for the fourth quarter was electronically certified and signed by the CBO
on September 1, 2015 and by the provost/CEO on September 3, 2015, which is more than
two weeks past the due date of August 15, 2015. The 2015-16 first quarter 311-Q was elec-
tronically submitted on November 16, 2015, which was one day late. Signatures of the CBO
and provost/CEO are dated November 16, 2015 and November 18, 2015, respectively. The
2015-16 second quarter 311-Q, due February 15, 2016, was executed and electronically filed
by the district on February 16, 2016, which was one day late. The district should ensure that
state reports are executed properly and filed timely.
3. The CCFS-323 Actual Enrollment Revenue report for 2014-15 was submitted on September
23, 2015, but was due September 15, 2015. The 2015-16 CCFS-323 report for P1 was filed
timely. At the time of FCMAT’s fieldwork the 2015-16 P2 was not yet due.
The P1 and P2 reports filed for 2013-14 and 2014-15 included P1 revenue greater than that
reported on the P2. As indicated in Standard 11.1, analysis of whether this has been corrected
for 2015-16 could not be performed. Because this is a cumulative report the accuracy of the
information reported in the prior review period is questionable. The CBO should review and
ensure the accuracy of all reports prior to submission. The district should ensure that state re-
ports are executed properly and filed timely.
4. Compton CCD’s 2015-16 Final Budget incorporates a projection of 5,860 FTES. The district
is offering 1,500 course sections to meet that FTES target. Interviews with El Camino CCD
staff and Compton’s management indicated that Compton continues to rely on “borrowing”
from summer FTES to meet its cap, which maximizes state funding in any single fiscal year.
FTES from summer term can be used in either fiscal year. Although this is a standard busi-
ness practice used by California community colleges, caution should be used as summer
ACCJC Standard III 55
FTES may eventually be exhausted by use in the prior fiscal year if borrowing continues to
occur for several successive fiscal years. The administrative team reported that enrollment is
a priority and anticipates eliminating the need for borrowing by the 2016-17 fiscal year.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
56 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.2 – Accounting, Purchasing
and Warehousing
Professional Standard:
The college timely and accurately records all information regarding financial activity (unrestricted
and restricted) for all programs. Generally Accepted Accounting Principles (GAAP) requires that
for financial reporting to serve the needs of the users, it must be reliable and timely. Therefore, the
timely and accurate recording of the underlying transactions (revenue and expenditures) is an essen-
tial function of the college’s financial management.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues to demonstrate improvement in overall accounting and recording en-
tries as evidenced through the removal of material weakness findings during the last four
annual audits. The district should continue its efforts by ensuring the director of accounting
or CBO continues to review and approve all journal entries and other accounting corrections
prior to posting to the financial system.
Note 15 in the June 30, 2014 annual audit report indicated that the district implemented
GASB 65. Note 15 also states, “Additionally, the financial statements reflect corrections of
accumulated accounting errors …which were discovered and corrected by management.”
Note 15 in the June 30, 2015 annual audit indicated that the district implemented GASB 68.
This indicates the business office leadership’s technical understanding and application of
GAAP.
2. Districts are required by the California Community Colleges Chancellor’s Office Budget and
Accounting Manual (BAM) to properly classify expenditures using four-digit activity codes
as described in the Taxonomy of Programs (TOPS) manual. Prior independent audits con-
tained findings that indicated many instances of incorrect TOPS coding were found and cor-
rected for audit purposes, but not corrected in the district’s financial system. The district has
not had a repeat of this finding during the last three fiscal years, indicating a clearer under-
standing and oversight of TOPS code application. Misclassification of activity could directly
affect the 50% law calculations.
Interviews with staff indicated that management made references to the BAM throughout the
year but no training was provided during this and the last review period. The district should
ensure that all applicable staff members receive training on the use of the BAM.
3. The district has continued to reduce the number of audit findings reported in the annual au-
dit, with no findings in the 2013-14 and 2014-15 audit reports. The systematic reduction and
ultimate elimination of findings in each of the last several fiscal years demonstrates ongoing
improvement in financial management and oversight.
4. Individual departments have online access to print financial reports for monitoring purposes.
Accounting staff meet with department chairs and directors to review budget issues at key
intervals during the fiscal year and are available as needed to answer questions. The CBO
ACCJC Standard III 57
conducts a quarterly budget to actuals variance review in conjunction with financial reporting
activities to identify any areas that appear to be problematic and require further review.
5. Each year, business office staff attend LACOE’s annual year-end closing trainings. LACOE
provides written procedures for monthly/annual closing processes, and the Business Services
Department has continued developing written processes and procedures for individual tasks,
including a year-end closing checklist. Closing documents are published and accessible by all
staff on a shared network drive. The CBO and the director of accounting indicated that staff
will once again attend the LACOE year-end training for 2015-16.
The district established a routine year-end cutoff date for purchasing, and two notifications
were sent to all staff informing them of the March 28, 2015 unrestricted general fund pur-
chasing cutoff for the 2014-15 fiscal year. However, no such communications were provided
to FCMAT for the 2015-16 fiscal year.
6. Interviews with staff indicated that a quarterly reconciliation process has been established
between Datatel and PeopleSoft. The district has hired an accountant to perform this task
and the monthly bank statement reconciliations. The El Camino CCD has provided Compton
with spreadsheets used for reconciliation purposes. Review of the electronic spreadsheets and
paper documentation at the time of fieldwork confirm that reconciliations between the two
systems are completed quarterly, and the bank reconciliations are performed monthly. District
staff expressed that reconciliations are not conducted more frequently throughout the year be-
cause of timing differences between the two systems in transaction processing and posting.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 3
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
58 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.3 – Accounting, Purchasing
and Warehousing
Professional Standard:
The college forecasts its revenues and expenditures and verifies those projections monthly to ad-
equately manage its cash. In addition, the college reconciles its cash to bank statements and reports
from the county treasurer monthly. Standard accounting practice dictates that, to ensure that all cash
receipts are deposited timely and recorded properly, cash is reconciled to bank statements monthly.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Business Services Department management staff oversees cash management for the dis-
trict. On July 1, 2014 the CBO issued a memorandum to the CEO that indicates he reviews
cash weekly by receiving a daily cash balance report and updates the cash flow projection
monthly to reflect prior month actuals. A 2015-16 cash flow projection was completed in Feb-
ruary 2016. Interviews with the CBO indicated no tax revenue anticipation notes (TRANs)
would be needed in fiscal year 2015-16. Review of the updated cash flow document con-
firmed no TRAN would need to be issued for fiscal year 2015-16. FCMAT was not provided
with a cash flow projection for 2016-17, but staff reported they do not anticipate the need for
a TRAN, as the lowest cash balance for any month in the current fiscal year is $9 million,
which is sufficient to cover monthly expenses.
2. The strength and technical knowledge of the Business Services Department’s team contin-
ues to increase with the ongoing stability of leadership that possess strong accounting and
auditing backgrounds. A review of a sample of revolving fund bank reconciliations indicates
ongoing improvement in their timely completion and review. The preparation dates noted
on reconciliations for the October and November 2015 Union Bank account 0561 reflect the
subsequent month and review by management shortly thereafter. A new accountant was hired
and has been on staff since January 2015; reconciliation duties have been assigned to this
position, allowing management more time to supervise staff and increase focus on processes
and procedures.
3. Interviews with management and Bursar’s Office staff confirmed that all cash is collected
at the Bursar’s Office and deposited into the clearing account. AR 6301 states, “The CCCD
commercial clearing account balance is to be transferred to LACOE not less than weekly and
more often whenever the balance reaches $90,000 in order to ensure the district is receiving
interest on its unused funds.” The Bursar’s Office policies and procedures mirror AR 6301.
Clearing account bank statements from March through November 2015 were provided, and
review of these statements and reconciliations revealed compliance with AR 6301.
Journal entries are prepared for collections, and a check is prepared for deposit to the County
Treasurer’s Office. All deposits to the County Treasurer and related journal entries are re-
viewed and signed by the CBO or the director of accounting prior to deposit and posting to
the district’s system of record (PeopleSoft). Documentation was shared with the review team
that indicated staff continue the practice of reconciling the district’s cash in the county trea-
sury monthly.
ACCJC Standard III 59
4. AB 318 was approved by the governor in June 2006 and appropriated $30 million to the dis-
trict as an emergency apportionment for cash flow purposes. This is considered to be a line
of credit against advance apportionments, subject to repayment with interest. To date, the
district has drawn down three installments totaling approximately $17.9 million. Annual pay-
ments of $1,292,420 are due on June 1 of each fiscal year. The outstanding debt as of June
30, 2015 is estimated at $13.1 million. The district expressed no plans to further access the
line of credit, but is exploring options with the California Community Colleges Chancellor’s
Office to refinance the line of credit at a lower interest rate.
The district staff presented the 20-year debt service schedule, based on the total draws to date
of $17.9 million, to the board on March 16, 2010. The CBO has included an annual debt ser-
vice payment of $1,292,420 for the line of credit in the multiyear financial projection spread-
sheet.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 2
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 5
April 2013 Rating: 5
April 2014 Rating: 5
April 2015 Rating: 6
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
60 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.4 – Accounting, Purchasing
and Warehousing
Legal Standard:
The college’s payroll procedures are in compliance with established requirements. (Education Code
Section 85241) Standard accounting practice dictates that the college implements procedures to en-
sure the timely and accurate processing of payroll.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Payroll Department continues to maintain procedure standards in payroll processing.
However, interviews continue to indicate that a lack of consistent oversight and supervi-
sion exists. Interviews with staff also indicated that district management only occasionally
reviews and approves payrolls submitted to LACOE, and that payroll staff review their own
work and then rely on LACOE for the main check and balance of the submission. However,
staff reported that they are taking more time to review their work to ensure all items are cor-
rect. LACOE has the documentation that supports each employee’s pay rate, and reviews the
submission with the documentation to ensure accuracy. Review and approval of all payroll
reports by district management, prior to submission to the county office, is essential for prop-
er internal controls and to protect district assets.
2. Sound internal controls dictate that no single employee has the ability to prepare, generate,
authorize and distribute payments; each of these duties should be properly segregated. Pay-
roll staff reported that payroll checks and/or stubs are disbursed by the specialist who pro-
cessed the payroll. The district should segregate the duties of distributing payroll checks from
the employee who generates the payroll. This could be done by having each payroll specialist
distribute the paychecks prepared by the other.
3. Meetings between the Human Resources and Payroll departments that give staff the op-
portunity to discuss board agenda items, LACOE issues, PERS/STRS matters, and process
improvement ideas are no longer held on a regular monthly basis. These meetings were con-
ducted to discuss personnel items approved by the board/special trustee, after which the floor
was open for discussion on other topics. Concerns regarding a lack of communication about
staffing changes that affect payroll continue. The district should re-establish a schedule of
routine meetings between staff members in the Human Resources and Payroll departments.
Input for agenda items should be sought from staff in both departments prior to each meeting
and include board meeting items and other matters that affect both departments. The meet-
ings should present an environment for sharing challenges in routine duties and collaboration
to identify options for resolution and improvement.
4. Payroll specialists continue to regularly attend training events at LACOE.
5. Payroll staff continue to receive copies of new employee contracts, and interviews indicated
that payroll staff routinely compare the information in all new employee contracts with infor-
mation reported on timesheets to ensure that new employees are compensated appropriately
and to further reduce payroll errors. During the current review period, interviews with staff
ACCJC Standard III 61
and management revealed growing concerns with the timeliness of payroll processing. The
district has engaged an external certified public accountant to review the processes associated
with payroll; however, the report had not yet been issued at the time of FCMAT’s fieldwork.
6. Payroll and benefits are processed through an interface between the HRS position control
system and both Datatel and PeopleSoft financial reporting systems. Posting in two financial
systems creates timing differences that must be reconciled when the district reports state-
required financial activities, budget and variance reports. This reconciliation process is per-
formed manually. Routine reconciliation continues to be a challenge due to the amount of
time that passes between the processing of each payroll and the upload from PeopleSoft to
Datatel by El Camino CCD. Interviews indicated that LACOE is considering a new enter-
prise resource planning (ERP) software, the implementation of which could be beneficial to
the district. A new ERP could integrate the financial, payroll and budget systems and elimi-
nate the need for reconciliation of data between multiple systems, resulting in improved ef-
ficiencies and greater confidence in financial data.
7. Interviews indicated that the El Camino CCD vice president continues to include a position
control number on all contracts. If the position control number is not on the contract, payroll
staff verifies the position with the vice president directly prior to inputting payroll.
8. The budget analyst is responsible for reconciling position control to payroll. Inconsistency
in completing routine reconciliations between position control and payroll records contin-
ued during this review period. Although efforts continue in the business office to clean up
the data stored in position control, interviews indicated this remains a work in progress. The
district should review and reconcile position control and payroll records monthly and resolve
any discrepancies timely to improve maintenance of position control and further reduce pay-
roll errors.
9. Department supervisors authorize overtime and compensatory time. AR 6311, Attendance
and Time Reporting, describes the regulations to which the district must adhere. The district
had developed a draft Payroll Department – Policies and Procedures document dated Febru-
ary 1, 2013. No updates to this draft were provided to FCMAT during this review period. The
district should review and update, as necessary, applicable board policy, administrative regu-
lations and department procedures to comply with sick leave requirements established by AB
1522, which became effective July 1, 2015.
10. The district has implemented a process for expediting payroll deduction payments to ven-
dors. Previously payroll deduction checks were processed and then mailed to vendors. Now,
a detailed deduction register is run, then the vendors are contacted with the information and
payment is sent electronically.
62 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 63
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.5 – Accounting, Purchasing
and Warehousing
Professional Standard:
Standard accounting practice dictates that the accounting work is properly supervised and work
reviewed to ensure that transactions are recorded timely and accurately, and allow the preparation of
periodic financial statements.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Consistency in business practices and oversight are an important role of the leadership in the
business office. Staff continue to express confidence in the district’s administrative team. Docu-
mentation provided to the review team also indicates that management continues to review and
approve much of the work performed by business office staff; however, as indicated elsewhere
in this report, oversight is still lacking in some areas. Staff reported that the CBO and the direc-
tor of accounting routinely request supporting documentation and/or clear explanation from staff
regarding their work during the review process. Reports prepared for submission to any agency
must be reviewed by management to help ensure accuracy and confirm that all costs associated
with the program are included. Staff reported that management continues to review reports be-
fore they are distributed. FCMAT noted management approval on many of the documents pro-
vided during this review period, which demonstrates ongoing improvement in this process .
2. Although the momentum has slowed, the CBO and the director of accounting continue their
efforts in developing and implementing operational processes and procedures for business
office tasks.
3. The district has established an administrative regulation that outlines the distribution of revenue
associated with enterprise activities. AR 3601, Section XIX, states the following:
To the extent that the bookstore, food services, and campus vending services gener-
ate a net profit, after deducting district expenses for maintenance and utilities, the
funds may be deposited in the following auxiliary organization accounts: 50% of the
net funds may be deposited in the Associated Student Body for Compton Communi-
ty College District accounts; 25% of the net funds may be deposited in the Auxiliary
Services fund to support student programs as designated by the Auxiliary Services
committee and approved by the CEO; and the remaining 25% of the net funds may
be deposited in the Foundation for the Compton Community College District ac-
counts to be used for student scholarships (see AR 3602 Student Scholarships), the
Academic Awards Tea and graduation related expenses.
Proceeds received from student enterprise activities go directly to the Bursar’s Office and are
deposited in the district accounts at the County Treasurer. In addition, the June 28, 2011 Master
Agreement between the Compton CCD and Foundation for Compton CCD indicates that the
foundation is a nonprofit organization existing pursuant to state laws and the Internal Revenue
Code Section 501(c)(3). The master agreement indicates that funds may be disbursed to theA s-
sociated Student Body (ASB), Foundation and Auxiliary as described in the paragraph above.
64 ACCJC Standard III
Review of bank statements for the general ASB account from February 2015 through January
2016 indicate that deposits associated with activity for 2013-14 and 2014-15 were made Sep-
tember 3, 2015. As of January 2016, the documentation provided did not reflect any disburse-
ments to the ASB related to the current fiscal year activity. Review of bank statements for the
scholarship account from February through December 2015 did not show deposits from net
proceeds from bookstore, food services or campus vending services. FCMAT was not pro-
vided with any detailed accounting of activities generated by these sources or approvals of
transfers.
AR 3610 indicates that the district “may” make transfers based on net profit, which could
require the fiscal year to conclude to determine the net proceeds available for distribution.
Management should provide ongoing routine oversight of all accounting activities and ensure
funds are properly and regularly disbursed.
4. Ongoing stability in the leadership in the Business Services Department has contributed
greatly to the progress made in the comprehensive financial standards. The CBO and director
of accounting continue to work to improve oversight in the business office, provide guidance
and training to staff, and establish improved business practices by developing and imple-
menting operational processes and procedures for several operational areas in the department.
5. The CBO and director of accounting perform many high level accounting tasks. In Janu-
ary 2015, the district hired an accountant who completes bank statement reconciliations and
Datatel to PeopleSoft reconciliations monthly and quarterly, respectively. These tasks were
previously done by the director of accounting. Delegation of these duties to a staff accountant
now allows more time for management review and oversight.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 6
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 65
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.7 – Accounting, Purchasing
and Warehousing
Professional Standard:
Generally accepted accounting practices dictate that, to ensure accurate recording of transactions,
the college have standard procedures for closing its books at fiscal year-end. The college’s year-end
closing procedures should comply with the procedures and requirements established by the Chancel-
lor’s Office.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has an established year-end closing checklist, which staff and management re-
ported is available to staff on the Business Services internal shared drive; however, the last
copy of this checklist provided to FCMAT was the one applicable to the 2013-14 fiscal year-
end closing. Additionally, the district historically sent out memos addressing purchasing cut-
off procedures and dates to district employees prior to year-end; however, no such documents
were provided to FCMAT for the 2015-16 fiscal year.
Interviews indicated that the CBO and director of accounting continue to perform the pre-
dominant share of tasks associated with year-end closing; however, the Business Services
Department staff members are clear on their responsibilities for year-end closing that are del-
egated to them. The CBO and director of accounting should continue to play an active role in
the year-end closing process, and provide staff with guidance, oversight, and assistance when
necessary.
2. The district continues to follow year-end closing procedures and schedules for PeopleSoft
systems established by LACOE. Although the district does not have an established proce-
dures manual, step-by-step desk procedures for some tasks have been developed and are
available to staff on the shared drive, as reported by staff and evidenced through visual obser-
vation by FCMAT during this review period. The director of accounting reported that proce-
dures are continually being reviewed and updated.
3. The district has had no findings in its 2013-14 and 2014-15 annual audit reports, which dem-
onstrates ongoing improvement and adherence to accounting procedures. The 2012-13 audit
report included two findings, 2013-3 and 2013-4, related to timely reconciliation of cash and
payroll clearing accounts, respectively. Documentation reviewed by FCMAT during this re-
view period supports the timely preparation and review of reconciliations, which are essential
components of year-end closing procedures. A new accountant was hired in January 2015;
reconciliation duties have moved back to the staff, allowing management more time to super-
vise staff and increase focus on processes and procedures.
66 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 0
June 2009 Rating: 2
January 2010 Rating: 4
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 7
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 67
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.9 – Accounting, Purchasing
and Warehousing
Professional Standard:
The college has documented procedures for the receipt, expenditure and monitoring of all construc-
tion-related activities. Included in the procedures are specific requirements for the approval and pay-
ment of all construction-related expenditures.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Interviews with staff and review of documentation, including the equipment purchase guide-
lines, accounts payable department policies and procedures, and the independent perfor-
mance audit report for the period ended June 30, 2015, indicated procedures are in place to
ensure approval of purchase orders is obtained before construction start dates, payment pro-
cess sheets are signed by Business Services Department staff, and payments are made timely.
The accounts payable policy and procedures for capital and bond expenditures specifically
require all expenditures to be reviewed and approved by the CBO and/or designated individu-
als, which was substantiated through management interviews and review of documentation
provided by the district. The procedures further require specific payment processing forms
that identify invoices as Measure CC and State Capital Outlay Projects. The CBO confirmed
that he continues to have sole control over all aspects of financial accounting and reporting of
the bond projects. All work should be reviewed and approved by an additional staff or man-
agement employee to help ensure that internal controls are maintained.
2. The district’s Measure CC general obligation bond financial statement findings for the years
ending June 30, 2014 and 2015 identified no deficiencies or material weaknesses. The reports
included one finding in fiscal year 2013-14 and no findings in the year ending June 30, 2015.
The June 30, 2014 finding cited an exception to Education Code Sections 15280 and 15282.
Per Section 15280, the Citizens’ Bond Oversight Committee is required to issue regular re-
ports on the results of its activities and make available the minutes of committee proceedings
on the district’s website. The June 30, 2014 audit indicates that although six meetings were
held during the year, only two committee meetings were posted for public record. FCMAT’s
review of the district’s website during this review period found that the minutes for 2013-14
had subsequently been posted.
The 2013-14 audit also indicates that the district’s Citizens’ Bond Oversight Committee
website did not reflect representation from two of the committee groups (business organiza-
tion and enrolled student) required per Education Code Section 15282. The district has since
made edits to its website postings; however, FCMAT was not provided with any documenta-
tion to verify that the members reflected on the website are current.
Review of the district’s website indicates that agendas for 2014-15 and 2015-16 bond com-
mittee meetings are posted, with the exception of the September 3, 2015 meeting. However,
not all meeting minutes are posted. Six meetings were conducted during the 2014-15 fiscal
year and, as of FCMATs fieldwork, four meetings had been conducted for 2015-16. Minutes
68 ACCJC Standard III
for 2014-15 meetings were posted to the website, with the exception of the June 2015 meet-
ing. Minutes were not posted for three of the four 2015-16 meetings. The district should up-
date the website with all available information related to the Citizens’ Bond Oversight Com-
mittee so it is available for public review.
3. Financial and performance audit reports for Measure CC general obligation bonds are posted
on the district’s website for fiscal years 2009-10 through 2014-15. The Citizens’ Bond Over-
sight Committee annual reports are only posted through 2014. The 2015 annual report should
be added to the website.
4. The Football Field project was properly documented from Prequalification Notice, to proj-
ect bid notification, to board/special trustee approval for bid results and award, notice of
intent to award, and notice to proceed. Bid and award notification documents were provided
to FCMAT for review, and indicate compliance with the district’s construction purchasing
guidelines.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 4
April 2013 Rating: 6
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 69
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 13.1 – Student Body Funds
Professional Standard:
The Governing Board adopts policies and procedures to ensure compliance regarding how student
body organizations deposit, invest, spend, raise and audit student body funds.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee adopted BP 3600, Auxiliary Organizations, and AR 3601, Auxiliary
Organization Protocols, on March 16, 2010. However, the district is not following its policy
and regulation in some areas as indicated below.
2. BP 3600, Auxiliary Organizations, gives the board the authority to recognize and approve
auxiliary organizations established to provide the district supportive services, specialized pro-
grams and functions identified in Title 5. The policy explains requirements for such organiza-
tions to be approved, and states that all recognized auxiliary organizations must comply with
Education Code provisions as follows:
• The composition of a board of directors and the way in which it conducts its meetings;
• Conducting an annual audit;
• Employing its work force;
• Expending and appropriating its funds, and keeping its records.
Based on BP 3600, the auxiliary organizations recognized by the Compton Community Col-
lege District are:
• Foundation for the Compton Community College District
• Associated Student Body Compton Community College District
• Patrons Association
3. AR 3601, Auxiliary Organization Protocols, outlines the way that auxiliary organizations
must conduct business, which is a requirement of Board Policy 3600.
The AR requires that an annual report be submitted to the board of directors of the auxiliary
organization and the CEO by September 15 of each year, and that the report include the fol-
lowing:
• All financial statements required to be filed with the state Chancellor’s Office
• A comparison of budgeted and actual expenditures
• A description of major accomplishments of the organization
• A description of improvements proposed for operation of the organization
FCMAT requested but was not provided with documentation necessary to verify that this re-
port is filed annually.
70 ACCJC Standard III
The AR states that the CEO shall annually provide to the Board of Trustees a list of all aux-
iliary organizations in good standing. A review of the board meeting minutes did not show
that the list was provided during this review period. The AR also states that “All auxiliary
organization procedures and practices shall be reviewed to determine compliance with Edu-
cation Code Sections 72670 et seq., and the policies, rules and regulations of the Board of
Governors, and of the District. The CEO shall designate the individual to conduct this review,
which shall be conducted at the end of the first complete fiscal year after its establishment
and at least once every three years thereafter.” FCMAT requested but was not provided with
documentation necessary to verify that reviews are occurring.
The district should ensure that board policies and administrative regulations are being followed
in a timely and complete manner, and revise policies and regulations if they are no longer cu-r
rent.
4. In addition to maintaining a district specific Associated Student Body Finance Code and Pro-
cedures Manual with written guidance on various operational procedures and best practices,
the business office also recommends the FCMAT Associated Student Body Accounting Man-
ual, Fraud Prevention Guide and Desk Reference for use as general guidance. FCMAT also
recommends the addition of language to BP 3600 to explain that the FCMAT manual supple-
ments the district’s board policy or procedures on student organizations and booster auxiliary
organizations. Sample board policy language is as follows:
The Governing Board adopts on an ongoing basis the most recent Fiscal Crisis and
Management Assistance Team (FCMAT) Associated Student Body Accounting
Manual, Fraud Prevention Guide and Desk Reference as Compton Community Col-
lege’s ASB Manual. In the event of any conflict between the most recent FCMAT
Associated Student Body Accounting Manual, Fraud Prevention Guide and Desk
Reference and Compton Community College’s ASB processes or procedures, the
policies and procedures established by Compton Community College will prevail.
This verbiage allows the district flexibility and clarity to follow its own specific policies and
procedures that may differ from those in the FCMAT manual.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 9
June 2012 Rating: 5
April 2013 Rating: 5
April 2014 Rating: 5
April 2015 Rating: 5
April 2016 Rating: 5
ACCJC Standard III 71
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
72 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 13.4 – Student Body Funds
Professional Standard:
Monitoring is performed by the Business Services Office to provide adequate oversight of student
funds and to ensure proper handling and reporting.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district is ultimately responsible for all activities of the Associated Student Body (ASB);
as such, board policy, procedures and internal controls must be established by the district to
facilitate those duties. Additionally, an appropriate degree of financial oversight and routine
follow-up of the activities of the ASB are also essential to ensure that established procedures
are followed. A significant level of oversight and support from the district’s business office is
essential to ensure that student body funds are handled appropriately.
2. District business office staff are responsible for general oversight of student body activities.
In this capacity, the business office staff should:
• Serve as a resource and answer questions from the ASB staff.
• Develop and update the district’s ASB manual, policies and procedures based on input
from those staff responsible for ASB, student organizations and district auditors. The ques-
tions asked throughout the year and the findings noted by the auditors should also be taken
into consideration when updating the policies and procedures manual.
• Provide training at least annually on the district’s procedures. This includes providing new
staff members and student council members with copies of the district’s ASB manual and
training during the year.
• Make periodic visits to the ASB office to review the ASB procedures in operation and
answer questions. It is a good practice to visit with those responsible for ASB at least once
a year and more often if the ASB appears to have problems or continues to have audit find-
ings year after year.
• Obtain and review financial reports from the ASB at least quarterly.
• Review the reconciled bank statements for all ASB accounts regularly, preferably monthly.
• Work with the ASB staff to respond to problems and audit findings noted by the auditors in
the annual audit, and develop corrective actions to resolve the issues.
• Follow up on all issues regarding the administration of student organizations.
• Develop accounting procedures for recording and controlling the student body organiza-
tion’s financial transactions.
• Periodically review procedures to ensure they conform to prescribed accounting pro-
cedures, taking into consideration any input from ASB staff, student organizations and
district auditors when updating policies and procedures.
ACCJC Standard III 73
Interviews with staff and students involved in ASB activities indicated that the district is en-
gaging in routine monitoring of ASB activities and funds. FCMAT continues to recommend
that the business office provide annual training to both staff and students who assume respon-
sibilities for ASB activities.
3. Journal entries, financial statements and bank statement reconciliations are completed with
management’s oversight, and FCMAT observed fewer inconsistencies in oversight during this
review period. FCMAT was provided 2015-16 bank statement reconciliations for all three
of the bank accounts (general, club and scholarship). At the time of FCMAT’s fieldwork, the
general and club accounts were reconciled through January 2016, and the scholarship account
through December 2015. Management should ensure staff complete bank reconciliations
within 30 days of statement receipt to facilitate early identification of errors or questions.
Extra attention should be given to the status of outstanding checks and deposits not cleared
after one month. FCMAT’s review indicated that a $250 check drawn on the scholarship ac-
count had been outstanding since September 2015, and checks for $49.36 and $30 drawn on
the club account were outstanding since October 29, 2014 and February 25, 2015 respec-
tively. It is likely the checks have been lost or misplaced by the recipients; attention should
be given to initiating the process to reissue the checks. The district’s ASB manual states that
“The ASB accountant or bookkeeper should verify that outstanding reconciling items are
cleared within the following month.”
4. FCMAT observed improvement in the district’s processes for reconciling ASB bank state-
ments during this review period. Signatures and dates supporting reconciliation preparation
and approval were present.
5. The business office has developed a comprehensive Associated Student Body Finance Code
and Procedures Manual for ASB staff, which supplements the FCMAT Associated Student
Body Accounting Manual, Fraud Prevention Guide and Desk Reference to address district
specific issues as they occur. FCMAT observed edits to the district’s manual indicating that
the district is actively reviewing and updating the manual based on actual practice and/or to
increase oversight and guidance.
6. Section III. E. of the district’s Finance Code and Procedures Manual includes procedures for
inactive clubs. Based on the definition in the manual, the district’s list of ASB clubs includes
a significant number of inactive clubs. The district’s ASB manual states that any remaining
balances of a club that becomes inactive are to be transferred to the general (ASB) fund fol-
lowing a one-year claim period. Although district business office staff members and ASB
student representatives acknowledged that there are several inactive clubs and discussions are
taking place for addressing the matter, it has not yet been resolved.
74 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 8
July 2010 Rating: 9
June 2012 Rating: 5
April 2013 Rating: 5
April 2014 Rating: 5
April 2015 Rating: 5
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 75
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 14.2 – Multiyear Financial Projections
Professional Standard:
The college annually provides a multiyear revenue and expenditure projection for all funds of the
college. Projected fund balance reserves are disclosed. The assumptions for revenues and expendi-
tures are reasonable and supportable.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The CBO continues to prepare a five-year projection for the unrestricted general fund. Mul-
tiyear projections allow the district to analyze the effects of assumptions over multiple years
and include economic and agency specific factors affecting changes in FTES, revenue and
expenditures. Multiyear financial projections (MYFP) are intended to provide management
with the time necessary to make appropriate budgetary adjustments to ensure that the district
maintains an adequate fund balance and fiscal solvency.
The details considered and incorporated into an MYFP are based on factors known at the
time of preparation and are essential to the accuracy of the projection in any given year
presented. The modification of factors in each year of the projection, such as the projected
change in FTES, inclusion and subsequent elimination of one-time revenue sources and/
or expenditures can have a significant effect on the results of the projection if not taken into
account. FCMAT was provided with a draft Five-Year Fiscal Management Plan updated Feb-
ruary 4, 2016. This projection is considered a working document that is updated annually,
when assumptions change, and when information becomes available that affects future years.
The February 4, 2016 version provided to FCMAT is being prepared as part of the 2016-17
budget development process. This plan provides key assumptions intended for use in budget
development. The revision dates provided in the plan indicate that it is routinely updated to
reflect identified changes and reviewed by the Planning and Budget Committee, Consultative
Council and board of trustees/special trustee. Key assumptions associated with revenue and
expenditure changes are considered over a multiyear period, including STRS and PERS em-
ployer contribution rate increases, changes in long-term debt obligations, other postemploy-
ment benefit (OPEB) obligations, and repayment of the line of credit.
Although FCMAT was provided with a current MYFP, the CCCD Five-Year Budget Assump-
tions workbook posted on the district’s website is dated August 29, 2012 and is considerably
outdated. The online version of this document and the detail contained in it is dramatically
different than that of the projections currently relied on by the administration. The district
should ensure that financial documents on the website are routinely posted and/or updated to
include the most current information.
2. While the district has traditionally completed an MYFP only for the unrestricted general
fund, the foundation of this standard is for the projection to be completed for all funds and
incorporating the entire fund, not just unrestricted resources. The district has not demon-
strated that it prepares MYFPs for the child development, bond interest and redemption,
capital outlay projects and revenue bond construction funds, nor does it include the restricted
general fund in the MYFP it does prepare. Preparing MYFPs for all funds, and including the
76 ACCJC Standard III
restricted resources separately in the general fund, allows the district to determine if financial
assumptions associated with other resources and funds will impact the unrestricted general
fund. The multiyear assessment of all funds and resources creates a complete picture of the
district’s financial position for the current and subsequent years.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 1
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 2
April 2013 Rating: 4
April 2014 Rating: 4
April 2015 Rating: 4
April 2016 Rating: 4
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 77
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 15.1 – Long-Term Debt Obligations
Professional Standard:
The college complies with public disclosure laws of fiscal obligations related to health and welfare
benefits for retirees, self-insured workers’ compensation, and collective bargaining agreements.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Through June 2014, the district was self-insured for workers’ compensation for the first
$500,000 of each claim and participates in the School Alliance for Workers’ Compensation
Excess II Joint Powers Authority to provide excess coverage. In May 2014, the district com-
mitted to changing from being self-insured for workers’ compensation to contracting with the
Protected Insurance Program for Schools and Community Colleges Joint Power Authority
(PIPS) for workers’ compensation reinsurance protection effective July 1, 2014, which is ad-
ministered by Keenan & Associates.
The district has contracted with Bay Actuarial Consultants for periodic actuarial services. The
actuarial study considers frequency of claims, average claim amount, size of loss distribu-
tions and loss development patterns. The most recent report dated June 22, 2015 shows pro-
jected unpaid losses of $1,509,000. This same amount is reflected in the Statement of Net Po-
sition in the annual audit report dated June 30, 2015. Note 12 of the audit report shows assets
available to pay claims at June 30, 2015 total $2,916,352. The district remains liable for any
claims submitted prior to the change to PIPS. FCMAT was not provided with any documenta-
tion that quantifies any outstanding financial obligation for losses associated with claims not
covered by the PIPS program.
2. The Governmental Accounting Standards Board (GASB) issued Accounting Standards 43 and
45 for other postemployment benefits (OPEB) in July 2004. This pronouncement requires em-
ployers who provide other postemployment benefits to employees to recognize the expense and
related liabilities in the annual financial statements. As of June 30, 2015, the district plan con-
sists of 79 retirees and beneficiaries that receive benefits, and 205 active plan members.
Interviews with administrators and with Planning and Budget Committee members indicated
that the district has implemented a plan to prefund future contributions in addition to the
mandatory pay-as-you-go costs associated with postemployment benefits through mutual
agreements between the district, the Planning and Budget Committee and the bargaining
units. This agreement establishes an irrevocable trust to fully fund postemployment benefits
over 20 fiscal years. According to the June 30, 2015 audit report, the district contributed
$619,747 in addition to the prior year contribution of $250,000 to the GASB Statement No.
43 trust with the Futuris Public Entity Investment Trust to be administered by Keenan &
Associates. The expected annual contribution of $250,000 increases to $1.4 million in 2029
following the final payment of the district’s state loan. These amounts may be amended by
the district and bargaining units by mutual agreement. The CBO indicated that $750,000 was
scheduled to be contributed in the fiscal year 2015-16. In accordance with GASB Statement
No. 45, the district reported the following obligation in Note 11 to the audited financial state-
ments for the year ended June 30, 2015:
78 ACCJC Standard III
Net OPEB obligation, beginning of year $5,977,159
Annual required contribution 1,721,216
Interest on net OPEB obligation 346,675
Adjustment to annual required contribution -437,555
Contributions -1,131,831
Net unfunded OPEB obligation $6,475,664
According to the latest actuarial report by Total Compensation Systems, Inc., dated Septem-
ber 3, 2015, the total pay-as-you-go plan annual estimates are $546,298 in 2015-16, $604,889
for 2016-17 and $709,483 in 2017-18.
3. The district’s initial proposal to the certificated bargaining unit for July 1, 2014 through June
30, 2016 was presented and sunshined at the May 19 and June 16, 2015 board meetings.
As discussed in Standard 16.1, the district has ratified multiyear agreements with its certifi-
cated and classified bargaining units.
4. The district implemented GASB Statements 68 and 71 for the fiscal year ended June 30,
2015. As a result, in Note 13 and in the Statement of Net Position on the June 30, 2015 au-
dited financial statements, the district reported its proportionate share of the net pension li-
abilities, pension expense and deferred inflow of resources of $22,808,355, $1,991,317 and
$6,312,056, respectively.
Standard Implemented: Fully - Sustained
April 2007 Rating: 0
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 79
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 16.1 – Impact of Collective
Bargaining
Professional Standard:
The college has developed parameters and guidelines for collective bargaining that ensure that the
collective bargaining agreement is not an impediment to efficiency of college operations. At least
annually, collective bargaining agreements are analyzed by management to identify those charac-
teristics that are impediments to effective delivery of college operations. The college identifies those
issues for consideration by the Governing Board. The Governing Board, in the development of its
guidelines for collective bargaining, considers the impact on college operations of current collective
bargaining language, and proposes amendments to contract language as appropriate to ensure effec-
tive and efficient college delivery. Governing Board parameters are provided in a confidential envi-
ronment, reflective of the obligations of a closed executive board session.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The process for collective bargaining is consistent with industry standards. The administra-
tion and board/special trustee take into consideration not only compensation, but other con-
tractual language. Factors other than compensation are reviewed and considered for negotia-
tions when re-openers create opportunity for revision and when the entire contract expires
and is open for negotiations.
The CBO is a member of the district’s certificated and classified collective bargaining teams.
The inclusion of the CBO during all collective bargaining sessions helps ensure that the fi-
nancial impact of all discussions and potential decisions is considered and evaluated prior to
agreement between the parties.
As of July 2015, the advisory board has been included in closed session board meetings.
Review of board meeting agendas indicates collective bargaining issues are a component of
closed session discussions.
2. The district ratified a multiyear settlement agreement with the certificated bargaining unit for
the period 2014-17 at a regularly scheduled board meeting held on November 17, 2015. The
agreement incorporated language modifications to compensation and several articles through-
out the contract. Increases to compensation were agreed upon and retroactively applied be-
ginning July 1, 2014 and each year that follows: 2014-15, 3%; 2015-16, 3%; and 2016-17,
2.85%. Negotiations for the 2016-17 fiscal year may include two non-economic issues se-
lected by each party and health and welfare benefits.
3. The district ratified a multiyear settlement agreement with the classified bargaining unit for the p-e
riod 2014-17 at a regularly scheduled board meeting held on November 17, 2015T. he agreement
incorporated language modifications to compensation for 2014-15 and 2015-16 and several article s
throughout the contract. The parties agreed to a 5% salary schedule increase retroactively applie d
beginning July 1, 2014 and a 1% salary schedule increase effective January 1, 2015. Negotiation s
for the 2016-17 fiscal year related to compensation, fringe benefits and two additional articles s-e
lected by each party may be reopened beginning September 1, 2016 for the 2016-17 fiscal year.
80 ACCJC Standard III
Standard Implemented: Fully - Sustained
April 2007 Rating: 8
January 2008 Rating: 8
July 2008 Rating: 8
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 81
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.1 – Maintenance and
Operations Fiscal Controls
Professional Standard:
The college has a comprehensive risk management program that monitors the various aspects of risk
management including workers’ compensation, property and liability insurance, and maintains the
financial well-being of the college.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues to contract with the Statewide Association of Community Colleges
Joint Powers Authority (SWACC) for the property and liability insurance coverage adminis-
tered by Keenan & Associates. The total program cost for the period July 1, 2015 to July 1,
2016 is $299,947 and provides coverages for general, liability, property, crime, equipment
breakdown, information/cyber security and privacy, and excess liability. Additional premi-
ums are charged for risk management services.
2. The district contracted with the Protected Insurance Program for Schools and Community
Colleges Joint Power Authority (PIPS) for workers’ compensation reinsurance protection
beginning July 1, 2014, previously being self-insured with the Schools Alliance for Workers’
Compensation Excess II JPA from June 1, 2011 to June 30, 2014. PIPS is a self-insurance
program that integrates risk transfer to reinsurers and risk retention by its self-insured mem-
bers and is administered by Keenan & Associates. This structure provides catastrophic pro-
tection up to $155 million per occurrence and frequency protection up to $1.5 million per
occurrence in excess of a 99% actuarial confidence level.
Although the district has moved to the PIPS program for workers’ compensation coverage, it
is still obligated to pay for prior claims submitted under the former self-insurance program.
FCMAT was not provided with any documentation estimating the projected liability for un-
paid losses associated with claims not covered by PIPS.
3. Assembly Bill 1432, which was signed by the governor on September 29, 2014, requires all
educational agencies to provide annual child abuse reporting and detection training to all em-
ployees who are mandated reporters under the Child Abuse and Neglect Reporting Act (Penal
Code Section 11166, et seq.). The district needs to obtain proof of completing the training
from mandated reporters within the first six weeks of the school year or within the first six
weeks of that person’s employment.
The district continues to contract with Keenan & Associates for employee training services,
which include those related to mandatory reporting, through SWACC’s excess property and
liability JPA, Schools Association for Excess Risk (SAFER). All employees are required to
complete online training courses for child abuse mandatory reporting, sexual harassment,
confidentiality, and facility emergency training. Communications are sent to department man-
agers through email regarding participation requirements. The Human Resources Department
is able to monitor the status of completion using a due date report and communicates with the
manager and employee when the required training has not been completed. Additional safety
82 ACCJC Standard III
training modules are also made available to staff in the following areas: emergency manage-
ment; employment practices/supervisory; environmental; health; human resources; informa-
tional technology; nutrition services; security; social and behavioral; and transportation.
4. The district continues to maintain an employee safety program and has a safety committee as
discussed in Standard 1.24 of the Physical Resources section of this report.
Standard Implemented: Fully - Sustained
April 2007 Rating: 4
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 8
April 2013 Rating: 9
April 2014 Rating: 9
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 83
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.2 – Maintenance and
Operations Fiscal Controls
Professional Standard:
The college has a work order system that tracks all maintenance requests, the worker assigned, dates
of completion, labor time spent and the cost of materials.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues its use of the web-based work order tracking system, SchoolDude. The
SchoolDude system is shared with the El Camino CCD as this was deemed to be more cost
effective, although the district may benefit from maintaining its own licensed version of the
software to maximize system use. The system allows the Maintenance and Operations De-
partment to document, access and track maintenance requests including detailed information
associated with each request such as description, location, status, time taken to complete the
work, cost of materials associated with the repair, and budget codes. The system allows users
to prioritize work orders, provide a status update, assign the craftsperson, and enter start/end
dates and a full description of the work to be performed. However, additional modules, not
available on the El Camino CCD system, are necessary to fully achieve this goal. The district
continues to use the system for a very narrow purpose of recording work order requests and
managing basic staff assignments by trade.
2. Signs are posted throughout the campus providing information on how to report mainte-
nance issues, and the signs include a call line for reporting. Calls from this number continue
to go directly to the director of facilities planning and operations, who assesses the details
of the request and then forwards the information to a staff member in the Maintenance and
Operations Department. The staff member enters the work order in the SchoolDude system
or sends an email with the details of the request to the department supervisors. Greater ef-
ficiency could be attained if the requests were initiated by the requesting party directly in the
SchoolDude system. Progress in fully utilizing this system continues to be limited.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 8
84 ACCJC Standard III
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 85
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.3 – Maintenance and
Operations Fiscal Controls
Professional Standard:
The college controls the use of facilities and charges fees for usage in accordance with college policy.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has a process for facilities use that is established through board policy and in-
cludes administrative rules, regulations and procedures including Education Code Section
82537 regarding the use of civic centers. BP 6700 and AR 6701, Civic Center and Other
Facilities Use, revised on December 15, 2015, addresses all terms for facility use permits.
However, Administrative Procedure 6701A, which includes the district rental fee schedules,
has not been revised since April 16, 2009. Administrative Regulation 6701 states that these
schedules are to be reviewed, updated and published annually. During the prior review peri-
od, staff reported that the district was evaluating the established fee schedule for facility use;
however, the process has not yet been completed.
2. At the time of FCMAT’s fieldwork, the new facility use agreement forms had not been imple-
mented and the staff member responsible for processing facility use permits had not been
provided an overview or training on the changes made to the policy, administrative regula-
tions or forms. Permits continue to be processed based on the former established policy;
as such the newly adopted policy remains unimplemented. Review of sample transactions
indicate that in general terms, the district follows procedures as established under the former
policy for submission, review and approval of facility use agreements.
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 9
April 2014 Rating: 9
April 2015 Rating: 8
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
86 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.4 – Maintenance and
Operations Fiscal Controls
Professional Standard:
The Maintenance Department follows standard college purchasing protocols. Open purchase or-
ders may be used if controlled by limiting the employees authorized to make the purchase and the
amount.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues to follow procedures established for purchase requisitions and purchase
orders, which have been implemented by the district as best practices to improve purchas-
ing controls and reduce incidents of unauthorized purchases. The district does not maintain
a warehouse to stock large quantities of supplies because of space limitations. Rather, the
Maintenance and Operations Department relies on routine orders as needed from custodial
supply vendors. The district continues to use blanket purchase orders (POs) for restocking
supplies, making this process relatively simple. Blanket POs are created in Datatel annually
for routine operational purchasing. They are established for the entire fiscal year and list the
names of staff members who are permitted to place orders and/or authorize payment. The
system allows blanket POs to be established and adjusted as necessary through a purchase
order change request. The changes are made by purchasing staff and documented in Datatel,
forwarded to accounts payable to assist with the payment process, and the vendor is notified.
POs cannot be increased if unencumbered balances are insufficient in the account line. If bal-
ances are insufficient for the desired increase, the accounting staff work with the requesting
department to perform a budget transfer.
Interviews with purchasing staff indicated that the director of facilities planning and operations
has a greater understanding of the budget, and the allocation of funds for blanket POs for the
Maintenance and Operations Department continued to improve during this review period.
2. The district utilizes an electronic purchase requisition system. After a requisition is initiated
in the system, it is routed electronically for required authorizations and preparation of a pur-
chase order by the purchasing technician. When the requisition is received by the Purchasing
Department, it is reviewed and a PO number is assigned. The purchasing technician verifies
account coding and ensures that information provided on vendor quotes is reflected correctly
on the PO and includes appropriate pricing, tax, shipping, etc., and tries to mitigate any is-
sues that may delay payment processing by accounts payable. Once complete, the director of
fiscal affairs signs all POs.
3. Contracts and purchase orders are placed on the board agenda for approval/ratification.
ACCJC Standard III 87
Standard Implemented: Fully - Sustained
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 4
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 10
April 2016 Rating: 10
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
88 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.5 – Maintenance and
Operations Fiscal Controls
Professional Standard:
Materials and equipment/tools inventory are safeguarded from loss through appropriate physical and
accounting controls.
Progress on Implementing the Recommendations of the Recovery Plan:
1. While the Maintenance and Operations Department has an established process for safeguard-
ing items such as cleaning supplies and custodial materials, it has historically been chal-
lenged to control the access and use of tools and equipment for maintenance. During the last
review period, interviews with staff and management indicated that storage bins for small
tools and equipment were being used to safeguard these items and to control access. The pro-
cess of securing small tools and equipment for maintenance and grounds in bins and check-
ing them out as needed has been suspended since November 2015 due to a staffing shortage.
Interviews with management indicated no instances of theft have occurred during this review
period.
A separate bin is used to maintain a centralized supply of custodial cleaning products and
supplies, and Maintenance and Operations Department supervisors are the only staff mem-
bers with keys to this storage facility.
2. The Maintenance and Operations Department does not have a formal inventory system for
tracking small tools and equipment; however, the department continues to work on imple-
menting a system to track these items. Interviews with management and supporting docu-
mentation indicate that while a list of tools and equipment was prepared, it is not up-to-date
and no routine physical inspection takes place to ensure all items remain at the district. Small
tool inventories should be sufficiently detailed to account for items purchased by the depart-
ment and should be updated as items are lost, damaged or otherwise disposed of. Physical
inventories should take place at least annually, and the documented inventory lists should be
updated accordingly and dated.
A physical inventory of fixed assets was completed by AssetWorks, and FCMAT was pro-
vided a copy of the fixed asset database dated June 30, 2015. Fixed asset inventory and valu-
ations of this type generally include fixed assets with values at or above a specified dollar
threshold, and do not include small tools.
3. Compton CCD department administrators are responsible for reporting transfers of property
within and between divisions and in general assume responsibility for the care, custody and
control of all department property. AR 6535, Use of District Equipment, clearly describes the
responsibilities of each employee related to the custody, use and authority associated with
district equipment under their control.
ACCJC Standard III 89
Standard Implemented: Partially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 4
April 2013 Rating: 4
April 2014 Rating: 4
April 2015 Rating: 5
April 2016 Rating: 5
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
90 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 21.1 – State-Mandated Cost
Professional Standard:
The college has procedures that provide for the appropriate oversight and management of mandated
cost claim reimbursement filing. Appropriate procedures cover: the identification of changes to exist-
ing mandates; training staff regarding the appropriate collection and submission of data to support
the filing of the mandated costs claims; forms, formats, and time lines for reporting mandated cost
information; and review of data and preparation of the actual claims.
Progress on Implementing the Recommendations of the Recovery Plan:
1. State Government Code Section 17550 et seq. authorizes the district to file mandated cost
claims for reimbursement of certain services mandated by the state. Mandated cost claims are
an opportunity for Compton CCD to recover funds spent on these activities.
2. Starting in 2012-13 local education agencies are able to participate in the California Community
College Mandate Block Grant rather than filing claims for specific mandates.T he district con-
tinued to opt in to the Mandate Block Grant and received $164,037 for the 2015-16 fiscal year.
Districts are able to file annual reimbursement claims for mandates that are not included in
the block grant. Payment for these claims would be received at some future time when the
state makes the funds available as part of the state budget, although the state continues to de-
lay payments for these reimbursements.
3. Although the district no longer engages consultant services for preparation of mandated cost
claims that are not included in the block grant, it should review mandates that are not in-
cluded in the block grant, and assess whether pursuing these claims would generate sufficient
revenue to offset the cost for staff and/or an outside consultant to prepare claims.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 7
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 7
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard III 91
Sources and Documentation
Interviews:
Academic affairs analyst (attendance), El Camino CCD
Accountants
Accountant, Bursar’s Office
Accounting supervisor
Accounting technicians
Board of Trustees members
Budget analyst
Certificated bargaining unit member
Chief business officer
Chief human resources officer
Classified bargaining unit member
Consultative Council members
Director of accounting
Director of admissions and records
Director of athletics and student activities
Director of facilities planning and operations
Director of fiscal affairs
Event coordinator/scheduler
Interim dean of student learning
Payroll specialists
Planning and Budget Committee members
Provost/chief executive officer
Purchasing agent
Purchasing technician
Senior administrative assistant
Special trustee
Superintendent/president, El Camino CCD
Utility maintenance supervisor
Vice president administrative services, El Camino CCD
92 ACCJC Standard III
District Documents:
2014-15 LACOE Year-End Closing Manual
2015-16 Adopted Budget Cover Letter, August 24, 2015
2015-16 Final Budget, September 8, 2015
2015-16 Final Budget Narratives and Assumptions
2014-15 General Ledger Datatel and PeopleSoft Reconciliation Support
2015-16 Account Availability Reports
2015-16 Classified Payroll Time Sheet Due Date Scheduled
2015-16 CCCD/ECCD CEC Organizational Structure, February 11, 2016
2015-16 Employee List, August 10, 2015
2015-16 General Ledger PeopleSoft Export YTD
2015-16 Mandated Programs Block Grant Payments, October 22, 2015
2015-16 Mandated Programs Block Grant Payment Notification, December 14, 2015
2015-16 Position Control PAR Log
2015-16 Position Control Template-PeopleSoft
2016-17 Overarching Priorities
A Guide to the Evaluation of Employee Performance in the Classified Service, Office of Human
Resources (no date)
Accounts Payable User Manual
Actuarial Review of the Compton CCD Workers’ Compensation Program, June 22, 2015, Bay Actu-
arial Consultants
Actuarial Study of Retiree Health Liabilities as of March 1, 2015, September 3, 2015 Total Compen-
sation Systems, Inc.
Analysis of Compliance with the 50 Percent Law, 2014-2015 Budget Year
ASB 2015-16 Account Availability Report, March 4, 2016
ASB 2015-16 General Ledger Detail Trial Balance Report, March 4, 2016
ASB Five Year Revenue and Expense Report 2011-2015
ASB Multi-Year Analysis, September 23, 2015
ASB –Memorandum re: Improvement in District Oversight (Draft)
Associated Student Body Finance Code and Procedures
Bank reconciliations and statements for various accounts, February 2015-January 2016
ACCJC Standard III 93
Board of Trustees Presentations and Reports Schedule for 2015
Board Meeting Agendas and Minutes, April 2015 - April 2016
Board Policies and Administrative Regulations and Procedures regarding Finance and District Operations
Budget to Actual Report, December 31, 2015
Business Services – Budget Development, Monitoring, and Maintenance Policies and Procedures
Manual, (various revision dates based on procedure)
Cash Flow Worksheet (TRAN Info) 2015-16
CCFS-311Q Quarterly Financial Status Report – 2014-2015 Q4, June 30, 2015
CCFS-311Q Quarterly Financial Status Report – 2015-2016 Q1, September 30, 2015
CCFS-311Q, Quarterly Financial Status Report – 2015-2016 Q2, December 31, 2015
CCFS-320 - Apportionment Attendance Report - 2014-2015 Annual, July 15, 2015
CCFS-320 - Apportionment Attendance Report - 2014-2015 P1, January 16, 2015
CCFS-320 - Apportionment Attendance Report – 2014-2015 P2, April 21, 2015
CCFS-323 2015 Estimated Enrollment Fee Revenue Report - Second Principal Apportionment, April
15, 2015
CCFS-323 2015 Actual Enrollment Fee Revenue Report Recalculation, September 15, 2015
CCFS-323 2016 Estimated Enrollment Fee Revenue Report – First Principal Apportionment, January
15, 2016
Certificated employee performance evaluation forms
Classified employee performance evaluation forms
Classified employee performance evaluation status communications, various dates
CEC Strategic Planning – 5-Year Comprehensive Master Plan 2017-2022, September 23, 2015
CEO communications to staff re: 2016-2017 Overarching Priorities, February 22, 2016
Combined Line of Credit Debt Service Schedule, June 1, 2009
Compton CCD 2015 Elected Board of Trustees’ Goals, February 17, 2015
Compton CCD 2016 Elected Board of Trustees’ Goals, January 25, 2016
Compton CCD Audit Committee Meeting Agenda and Minutes, December 8, 2015
Compton CCD Audit Committee Meeting Agenda, February 23, 2016
Compton CCD-Compton Center Planning Model, not dated
Compton CCD and El Camino CCC 2015-2016 Overarching Priorities, undated
Compton CCD Employees Policy and Procedures Handbook, August 2008
94 ACCJC Standard III
Compton CCD Measure CC General Obligation Bond Financial and Performance Audit Report, June
30, 2015
Compton CCD Proposed Line of Credit Debt Service Schedule, not dated
Compton CCD Strategic Planning Summit Materials and Report, May-November 2015
Compton CCD Tentative Budget Fiscal Year 2015-2016, June 16, 2015
District Equipment Checklist Samples
Draft Equipment Purchase Guidelines, February 19, 2013
El Camino College Compton Center FTES Goal and Actual 2011-2016, December 4, 2015
El Camino College Compton Center 5 Year FTES Projection 2014-2019, March 4, 2016
El Camino College District Compton Center School Year Calendars draft
Employee evaluation status lists, 2014-15
Employee evaluation samples, 2014-15
Evaluation Procedure for District Administrators, June 7, 2011
Facilities Planning and Operations Completed Work Order Samples, June 2015-March 2016
Facilities Project-Construction Manual Compton Football Field, June 15, 2015
Facilities Project-Bid Advertisement Order Confirmation, June 8, 2015
Facilities Project-Board Agenda Approval Contract Ratification, July 8, 2015
Facilities Project-Board Minutes Approval Contract Ratification, July 8, 2015
Facilities Project-Change Order Sample Form
Facilities Project-Notice of Intent to Award Contract Letter, Football Field Replacement, June 24, 2015
Facilities Project-Project Award Letter Football Field Replacement, June 24, 2015
Facilities Project-Notice to Proceed Letter, Football Field Replacement, June 1, 2015
Facilities Project-Communications re: Construction Documents, June 17, 2015
Facility Use Agreement Executed Permit Samples
Five-Year Fiscal Management Plan (2013-14 through 2017-18) – Unrestricted General Fund, Updated
February 4, 2016
Fixed Asset Data Base, June 30, 2015
Form 6701A-2c Facility Use Agreement Application/Permit, January 26, 2016
Form 700 2014-15 Annual Statement of Economic Interests Completed Forms
Form 700 2014-2015 Filed List
ACCJC Standard III 95
Form 700 Fair Political Practice Commission 2014-15 Deadline Memo, February 27, 2015
Independent Audit Report, June 30, 2015
Job Description, Accountant, July 2009
Job Description, Accounting Technician, July 2009
LACOE HRS District Payroll Schedule, January 2016
LACOE HRS Position Control Manual, Vol. 2, 2012
LACOE Bulletin 4084 – 2014-15 Year-End Closing Area Meetings and Webinars, April 15, 2015
LACOE Bulletin 4230 – Falcon Fuels Contract Piggyback, November 9, 2015
LACOE Bulletin 4266 – 2016 Standard Mileage Rate, December 21, 2015
LACOE Bulletin 4269 – Competitive Bid Limit Increase, January 4, 2016
LACOE Bulletin 4285 – Equipment Contract Piggyback, January 15, 2016
Letter of Intent to the California Community Colleges Chancellor’s Office (CCCCO), August 30,
2014 – FY 2015 Mandate Block Grant
Letter to the CEO dated February 12, 2015 to explain the need for a review of the Bursar’s Office
Internal Control and the reporting process and structure to do so, pursuant to the 2013 Internal Audit
Plan
Manager employee performance evaluation forms
Memorandum re: Athletes meal money, Revised February 2, 2016
Memorandum re: Audit Holds, (Draft) April 28, 2016
Memorandum re: Stale dated check from ASB Club account bank reconciliation (Draft) April 28, 2016
Memorandum re: Travel (Draft) April 28, 2016
Memorandum from CBO re: Unlawful Activity and Reporting Guidelines, September 19, 2014
Memorandum from CBO re: Unlawful Activity and Reporting Guidelines, February 24, 2016
Memorandum to the CEO re: 2014-2015 CCC District Budget Update, February 12, 2015
Memorandum to the CEO re: 2015-2016 CCC District Budget Update, May 15, 2015
Memorandum to the CEO re: 2015-2016 CCC District Tentative Budget, June 10, 2015
Memorandum to the CEO re: 2016-2017 CCC District Budget Update, January 21, 2016
Memorandum to the CEO re: Five Year Fiscal Management Plan Development, July 1, 2014
Memorandum to the CEO re: Other Postemployment Benefits (OPEB) Plan, March 1, 2013
Memo to Campus Community Unlawful Activity and Reporting Guidelines, February 24, 2016
Memorandum to Faculty re: Attendance Accounting Instructions for Spring 2015, January 13, 2015
96 ACCJC Standard III
Memorandum to Managers: Outstanding Invoices and Unrecorded Receipts for Fiscal Year 2015,
July 1, 2015
Memorandum to Managers: Preparing, Reviewing, & Submitting Financial Reports, August 28, 2015
Memorandum to Staff re: 2014-2015 Requisition Cut-Off Dates, Year-End Closing Reminder, March
13, 2015
Memorandum to Staff re: 2016-17 Overarching Priorities, February 22, 2016
Memorandum to Staff re: Classified Employee Performance Evaluations, March 25, 2015
Memorandum to Staff re: Invoices without Approved Requisitions, March 15, 2015
Memorandum to Staff re: Approved Time Reporting Forms, June 25, 2015
Memorandum to Staff re: Policies & Procedures, July 23, 2015
Message from the Provost/CEO to ECC Faculty, Staff and Managers, February 18, 2016
Newsletters – ECC and Compton Center, July 2015-February 2016
Object Code Guidelines, February 3, 2015
Organization Chart, Business Services, February 11, 2016
Payroll Accounting Reports, various months 2015-16
Payroll Audit Reports, various months 2015-16
Planning and Budget Calendar, 2015-2016
Planning and Budget Calendar, 2016-17
Planning and Budget Committee Meeting Agendas and Minutes, March 2015-February 2016
Policies and Procedures - Accounts Payable Department, November 1, 2012
Policies and Procedures - Purchasing Department, revised February 1, 2013
Policies and Procedures - Capital Outlay Bond Funds, March 8, 2013
Policies and Procedures - Contract Change Order, February 1, 2013
Procedures draft – Employee Payroll Deductions, February 19, 2016
Professional Consulting Services Agreement for Internal Control Review of Bursar’s Operation Cash
Controls
Property and Casualty Claims Administration Agreement, July 1, 2013 - June 30, 2016 by Keenan &
Associates, no execution date
• Amendment No 1, effective July 1, 2014
• Amendment No 2, effective July 1, 2015
• Reporting Addendum
ACCJC Standard III 97
Protected Insurance Program for Schools & Community Colleges (PIPS)
• 2015-16 SWACC and PIPS Pre-Renewal Presentation Materials
• Deposit Renewal Rates Program Year July 1, 2015-June 30, 2016
Purchase Order Listing for Board Approval, April 2015 through February 2016
Purchase Order Terms and Conditions
Purchasing Guidelines, January 1, 2015
Purchasing Procedures, January 15, 2013
Rules and Regulations of the Classified Service, Compton CCD Personnel Commission, revised
September 2005
Sample Open Purchase Orders
Sample Budget Transfers, May 2015-January 2016
Sample Deposit Transactions, January 2016
Sample Expenditure Transfers, June 2015-January 2016
Sample Program Review & Planning Reports, TracDat 2015-2016
Sample Revolving Fund Disbursement Transaction, January 2016
Special Trustee Advisory Committee Meeting Minutes, various 2015
Standards for Internal Control in the Federal Government (provided by the district), GAO September
2014
Student Attendance Accounting Manual (SAAM) (provided by the district), California Community
Colleges Chancellor’s Office (CCCCO), January 2001
SWACC 2015-16 Program Summary, by Keenan and Associates, July 1, 2015
• SWACC 2015-16 Memorandum of Coverage
• SWACC 2015-16 Program Year Renewal letter
• SWACC letter dated July 2, 2014 on Mandatory Reporting requirements
• SWACC letter dated April 27, 2015 on 2015-2016 WeTip Membership
• SWACC Services and Resources, 2015-16
SWACC Compton CCD Estimated Contribution/Premium Summary, July 1, 2015-July 1, 2016
SWACC Certificate of Coverage, July 7, 2015
Tentative Agreement for Proposed 2014-2017– Contract between Compton Federation of Certificated
Employees and Compton CCD, October 14, 2015
Tentative Agreement between Compton CCD and CCC Federation of Classified Employees, Novem-
ber 3, 2015
WeTip Poster/Flyer
98 ACCJC Standard III
Other:
Site walk and facilities observation
Compton Community College District website (http://www.district.compton.edu)
ACCJC Standard III 99
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard IV: Leadership and Governance
A. Decision-Making Roles and Processes – The institution recognizes that ethical and effec-
tive leadership throughout the organization enables the institution to identify institu-
tional values, set and achieve goals, learn, and improve.
1. Institutional leaders create an environment for empowerment, innovation, and institutional
excellence. They encourage staff, faculty, administrators, and students, no matter what their
official titles, to take initiative in improving the practices, programs, and services in which
they are involved. When ideas for improvement have policy or significant institution-wide
implications, systematic participative processes are used to assure effective discussion, plan-
ning, and implementation.
2. The institution establishes and implements a written policy providing for faculty, staff,
administrator, and student participation in decision-making processes.
a. Faculty and administrators have a substantive and clearly defined role in institutional
governance and exercise a substantial voice in institutional policies, planning, and budget
that relate to their areas of responsibility and expertise. Students and staff also have estab-
lished mechanisms or organizations for providing input into institutional decisions.
b. The institution relies on faculty, its academic senate or other appropriate faculty struc-
tures, the curriculum committee, and academic administrators for recommendations about
student learning programs and services.
3. Through established governance structures, processes, and practices, the governing board,
administrators, faculty, staff, and students work together for the good of the institution. These
processes facilitate discussion of ideas and effective communication among the institution’s
constituencies.
4. The institution advocates and demonstrates honesty and integrity in its relationships with
external agencies. It agrees to comply with Accrediting Commission standards, policies, and
guidelines, and Commission requirements for public disclosure, self study and other reports,
team visits, and prior approval of substantive changes. The institution moves expeditiously to
respond to recommendations made by the Commission.
5. The role of leadership and the institution’s governance and decision-making structures and
processes are regularly evaluated to assure their integrity and effectiveness. The institu-
tion widely communicates the results of these evaluations and uses them as the basis for
improvement.
ACCJC Standard IV 1
2 ACCJC Standard IV
Accrediting Commission
for Community and Junior April Jan. July June Jan. July June April April April April
2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
Colleges (ACCJC) Standard IV:
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Leadership and Governance
A. Decision-Making Roles and Processes
Standard to be Addressed
Communications - Community Relations and Governance
Staff input into college operations is
1.3 1 2 2 4 7 6 7 7 7 8 9
encouraged.
Community Collaboratives, Advisory Committees - Community Relations and Governance
The board and president support
partnerships and collaborations
3.1 2 2 3 5 8 7 8 8 9 9 9
with community groups, local
agencies and businesses.
The board and the president
establish broad-based committees
or councils to advise the college on
critical college issues and operations
as appropriate. The membership
3.2 of these collaboratives and councils 3 3 3 4 6 6 7 8 7 8 9
should reflect the full cultural,
ethnic, gender and socioeconomic
diversity of the student populations
– Shared Governance, Academic
Senate, etc.
Community collaboratives and college
Shared Governance, and Academic
3.3 Senate have identified specific 2
outcome goals that are understood by
all members.
The college encourages and
provides the necessary training for
collaborative and council members to
3.4 3
understand the basic administrative
structure, program processes and
goals of all college partners.
Community collaboratives and
college councils effectively fulfill
3.5 3
their responsibilities and provide a
meaningful role for all participants.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard IV 3
4 ACCJC Standard IV
ACCJC Standard IV-A: Decision-Making Roles and Processes
FCMAT Community Relations/Governance Standard 1.3 – Communications
Professional Standard:
Staff input into college operations is encouraged.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton Center has a Consultative Council whose purpose, as stated in the Compton
CCD 2015-2016 Standing Committees document, is “To review materials provided from
the various committees designated as committees of the Consultative Council and provide
recommendations to the Provost/CEO. The committee members will be the leadership from
each campus-wide constituent group and will meet on a weekly basis.” The committee has a
membership of seven, representing management, the Academic Senate, the certificated bar-
gaining unit, the classified bargaining unit, the Associated Student Body and confidential em-
ployees, and is chaired by the provost/CEO. The two committees that directly function in the
governance area are Institutional Effectiveness and Planning and Budget. These committees
have their own purpose or mission. See Standard 3.2 for additional information regarding the
council and various committees.
2. The center also has 10 operational campus committees: Accreditation Steering; Audit; Facili-
ties; Health, Safety and Parking; Technology; Enrollment Management; Student Success;
Professional Development; Auxiliary Services; and Health Benefits. Each of these com-
mittees has members from the campus constituency groups. This year, an Audit Committee
and an Accreditation Steering Committee were formally added to the operational committee
group.
The purpose of the Accreditation Steering Committee is “to coordinate the El Camino Col-
lege Compton Center accreditation activities.” The steering committee is composed of the
“Provost/CEO, Accreditation Liaison Officer, El Camino College Vice Presidents, standard
team leaders, a representative from Institutional Research and Planning, and other interested
individuals.” As many as 43 individuals are involved in this committee.
The center should continue the standing committee structure and ensure that the actions and
deliberations of the committees are published and disseminated to help guarantee widespread
communication.
3. Since the previous review period, the Institutional Effectiveness Committee has undergone
some changes. Because of some of the challenges, including the departure of a co-chair, the
group did not meet in fall 2015 but worked on refining the process for review and approval of
program review documents so it would be more effective.
The center still provided the program reviewers with data but focused primarily on interpre-
tation of the data to complete the review. Now failure to comply with program review sub-
mission deadlines results in no overload assignments, no additional program support and no
budget since planning and budget are linked together. The committee agreed that getting the
ACCJC Standard IV 5
deans involved would allow nonsubstantive changes to be made by the dean and the program
staff, which would move the process forward. This has been the case.
The center addressed the previous FCMAT concerns and recommendations with appropriate
attention and consultation, and the program review process has been improved. More reviews
are going through the process timely, and the linkages to budget and planning are clearer and
more effectively implemented.
4. The review team attended a Consultative Council meeting on March 21, 2016 at which most
of the council members were present. The provost/CEO reviewed the March 22, 2016 elected
Board of Trustees meeting agenda. In addition, representatives gave reports, and a discussion
of campus committees took place that included the request for agendas and minutes from the
previous years and a 2015-16 campus committee evaluation document. Discussions also indi-
cated that the committee website is being updated.
The Consultative Council meets regularly, and meeting minutes indicate that most members
are present. During the prior review period, the team recommended that more detail be pro-
vided in the meeting minutes. Because part of the intent of meeting minutes is to memorialize
actions and recommendations, it is helpful if they contain enough detail so that the campus
community who are not at the meetings can understand the issues discussed. Fostering com-
munication between and among the campus constituents was a concern during the prior re-
view. While discussions have improved between campus representatives and their constituent
groups, there is still a need to provide more campuswide communication about the actions
and discussions of Consultative Council, which is the primary committee at the center that
deals with participatory governance.
5. The review team met with some members of the Planning and Budget Committee. As recom-
mended in the prior report, and discussed further in Standard 3.2, the center should develop
a process that provides an opportunity for committee members to attend budget discussions
that occur during the summer.
6. During the prior review, interviews with representative groups indicated a perception by
some that while input was sought, they did not see their ideas reflected in decisions. Some
of this is a natural outcome of not selecting particular ideas offered in the shared governance
process. Interviews also indicated that some of the representatives did not inform their con-
stituent groups of the decisions and the background surrounding them. During this review,
conversations with center leadership from the faculty, managers and classified staff indicated
that much improvement has occurred in this area. The Academic Senate leadership indicated
they are full partners with the center in decision-making. They indicated that their ideas and
suggestions are seriously considered and they take responsibility for informing their constitu-
ents about decisions and conversations. Classified representatives echoed this sentiment.
The constituent groups are committed to the upcoming accreditation process and are working
with the provost/CEO and upper management to participate and support the center’s effort in
this regard.
6 ACCJC Standard IV
The review team found that previous issues between long-time faculty and newer faculty
members have been much less problematic, and newer faculty are reaching out and embrac-
ing the challenges of campus governance. These types of attitudes and behaviors, which can
improve collaboration and positively impact the educational opportunities for students at the
center, should continue to be encouraged.
7. The provost/CEO continues to make himself available for members of the campus commu-
nity to meet with him informally on any matter of concern, to share ideas and ask questions.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 7
ACCJC Standard IV-A: Decision-Making Roles and Processes
FCMAT Community Relations/Governance Standard 3.1 – Community
Collaboratives, Advisory Committees
Professional Standard:
The board and president support partnerships and collaborations with community groups, local agen-
cies and businesses.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The outreach strategy for the Compton Center has been formalized in the Enrollment Man-
agement Plan, and implementation is under way. The district has supported the implementa-
tion by providing funding and staffing for the activities described in the plan. Although the
Enrollment Management Plan continues to have a focus on student success, and outreach and
recruitment from feeder high schools, it also includes the development of partnerships. The
current plan, dated January 1, 2016, covers the years 2015-18.
The Enrollment Management Committee develops marketing, recruitment and retention
plans. The 2015-2018 Enrollment Management Plan describes the committee as the body that
distributes college resources to fund projects that work to increase matriculations, student
success, and retention on campus. The plan indicates that the Enrollment Management Com-
mittee is committed to ensuring student success at El Camino College Compton Center and
providing funding to programs, departments, and individuals to support innovative approach-
es to student success. Of the current nine objectives of the committee, eight refer to student
success. However, the enrollment management and marketing plans include specific outreach
strategies to engage local school districts and charter schools and to provide information to
middle and high school students within the district’s boundaries. In general, the goals are spe-
cific, include measurable results and the costs associated with them, as well as timelines and
the responsible employee or office. Interviews indicated that two new programs, Fire Acad-
emy and Cosmetology, will be offered by the center within the next year. It is expected that
these programs will contribute to enrollment growth at the center. The team was not provided
with minutes from the Enrollment Management Committee, so its work could not be evalu-
ated.
2. The provost/CEO continues to make a priority of developing relationships with local busi-
nesses and building partnerships with community and civic organizations. The provost/CEO
informs the community of Compton Center activities and goals through meetings with church
groups, business roundtables, and local councils. The provost/CEO has made several presen-
tations in the local communities. The agendas for these presentations includes the process to
accreditation, the MOU describing the partnership with El Camino CCD, the role of FCMAT,
the district budget, the facilities master plan, the bond measures, and the opportunities for
community participation in governance. Members of the Board of Trustees and the Special
Trustee’s Advisory Committee are invited to attend. The high school principals’ breakfast,
hosted by Compton CCD and attended by the provost/CEO, highlighted what is happening
at the Compton Center with an emphasis on the First Year Experience program. The provost/
CEO also serves as the district’s representative to the Tri-City Adult Education Consortium.
8 ACCJC Standard IV
3. The Special Trustee’s Advisory Committee discussed the outreach activities of the center at
its meeting on March 21, 2016.
4. The provost/CEO has developed close relationships with the Compton and Lynwood uni-
fied school districts’ superintendents. The review team met with one of the superintendents.
He expressed pleasure about the relationship with the center and the growing coordination
between the two districts on projects relating to preparing students for college, including the
College Promise program that ensures successful students will be able to attend college.
5. The members of the Board of Trustees also regularly attend community meetings. One of the
board goals for 2016 is to “represent the public interest by participating in community activi-
ties and events; bring relevant observations to the Board for policy issues.”
The district should continue its outreach to community groups and the formation of partner-
ships that will serve the district and its students. Board members also should continue to par-
ticipate in community outreach with each of their constituencies.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 8
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 9
ACCJC Standard IV-A: Decision-Making Roles and Processes
FCMAT Community Relations/Governance Standard 3.2 – Community
Collaboratives, Advisory Committees
Professional Standard:
The board and the president establish broad-based committees or councils to advise the college on
critical college issues and operations as appropriate. The membership of these collaboratives and
councils should reflect the full cultural, ethnic, gender and socioeconomic diversity of the student
populations: Shared Governance, Academic Senate, etc.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee adopted Board Policy 2410 (10/20/2009), Board Policies, Admin-
istrative Regulations and Procedure, which states that employees and students shall have the
opportunity to participate in the development of board policies and administrative regulations
through a consultative process. Board Policy 2410 was revised on August 13, 2014.
The board/special trustee also adopted Board Policy 2510 (7/20/2010), Participation in Local
Decision Making. This policy states that, although the board is the ultimate decision maker,
it is committed to ensuring that appropriate members of the district participate in developing
policies and regulations. Additionally, the policy states that, except in emergency situations,
the board will not take any action on matters subject to this policy until the appropriate con-
stituent groups have been provided the opportunity to participate. Although these policies
have been adopted, they are not fully operational because at present the special trustee is the
decision maker.
2. The Consultative Council and its subcommittees are responsible for providing input for deci-
sion-making. The membership of the Consultative Council consists of three faculty members
(including the Academic Senate president and the certificated unit president), one student,
two classified employees (one representative of the confidential employees and a classified
unit representative), one manager, and a staff assistant. The vice president attends meetings,
and the provost/CEO serves as chair; these individuals are not members of the council. This
form of the council was adopted four years ago and has been successful. The council meets
weekly.
The members receive reports on and consider such varied items as construction projects, the
budget, progress toward accreditation, board policies and updates of committees, the plan-
ning summit, and facility updates. The committee also reviews upcoming Board of Trustees
meeting agendas. Some meetings provide for reports from the various constituencies, al-
though frequently a constituency has no report to give. The 2015-16 goals include improving
communication and campus climate, addressing board policies and procedures, and maintain-
ing and strengthening relationships between El Camino College and the Compton Center.
The minutes of this committee are mostly limited to a statement of the actions taken, and thus
do not describe the discussion that occurred. It is not clear whether the council is mainly the
recipient of reports or, in fact, engages in serious discussion about the issues presented. More
detailed minutes would allow nonmembers to understand the actions of the council. The pro-
vost/CEO and others indicated that the council members are encouraged to ask questions but
10 ACCJC Standard IV
seldom do. The review team also observed this behavior during its visit. Recently the pro-
vost/CEO proposed that, in the future, the council be co-chaired by the provost/CEO and the
Academic Senate President.
3. The Institutional Effectiveness Committee, a committee of the Consultative Council, is
charged with focusing on the program review to ascertain that the questions are being ad-
dressed and to ensure the consistency of documents. The committee membership consists of
two managers, four faculty members, two classified staff, and one student. The committee
reviews the documents and recommends revisions using a feedback template. The committee
also is responsible for monitoring the recommendations made by FCMAT that are related to
the charge of the committee and reviewing the El Camino College Compton Center Educa-
tional Master Plan, Facilities Master Plan, Staffing Plan, and Technology Master Plan.
During the previous review period, the committee’s detailed minutes showed that the com-
mittee focused almost exclusively on program reviews. The committee frequently returned
program reviews to the authors for changes. Many reviews were cited for “missing the neces-
sary rigor,” and the suggestions for improvement of the documents were often quite specific.
The quality of the program review documents had improved since the committee took an
active role in their development and review. The program reviews are used in making budget
allocations.
After the previous review period, there was a change in the leadership of this committee.
Additionally, the members realized that their procedure of returning reviews for corrections,
etc. could delay the process if the authors of the review did not make timely revisions of their
documents. The committee discussed whether they should pass the reviews on to keep the
process moving. As a result of the leadership change and the desire to streamline the process,
the committee did not meet during fall 2015. Thus, the review team was not provided with
any meeting minutes to review. The committee plans to resume its business in the current se-
mester, and the provost/CEO indicated he would like to assist the committee by providing a
coordinator.
4. The Planning and Budget Committee, a committee of the Consultative Council, serves as
the steering committee for campuswide planning and budgeting. The committee member-
ship consists of two managers, four faculty members, two classified staff, and one student. It
ensures that planning and budgeting are integrated and that budget allocations are consistent
with district goals, master plans, and program review documents. Recent meetings include
discussion of budget assumptions, what data should be provided to the committee and what
form it should take, and approval of the 2015-16 budget. The detailed minutes of this com-
mittee reveal that the members discuss the issues. For example, the committee has discussed
the link that must exist between planning and budgeting. The members agree that this critical
link must occur through program review. The committee continues to struggle with the issue
of the lack of faculty attendance at meetings held during the summer when budget informa-
tion is available and important decisions are made regarding the next academic year’s budget.
A suggestion was made by the committee to appoint alternates; however, members recognize
the importance of consistent attendance of the same people. The center should work to find a
solution to the lack of faculty input during the summer.
ACCJC Standard IV 11
Committee members recognize their role is advisory; however, they stated that they are genu-
inely being consulted and that important items are brought to them for consideration. They
also stated that the planning process is improving.
5. Advisory committees are required for all technical programs. If properly constituted, they can
provide valuable advice for program changes and development. Topics such as job oppor-
tunities in the field, industry expectations, preparation of students, and suggestions made by
industry representatives are usually discussed. During the previous review period, interviews
indicated that the goal is to have each committee meet twice a year. However, only one tech-
nical program, the Film/Video and New Media Program, had minutes from a meeting since
the last review in April 2015.
The district must make use of advisory committees, and make notes from the committee
meetings available on the center’s website for accreditation purposes.
6. The Special Trustee’s Advisory Committee was established four years ago. The role of the
committee is to advise the special trustee regarding policy matters that affect the district
and its operations; promote community awareness of the district’s efforts; focus on quality
instruction, educational mission, fiscal stability, and ultimately accreditation; and foster com-
munity support for the district and the Compton Center. The number of members is not fixed;
however, there are to be at least seven. There are currently eight members including the stu-
dent member.
The committee’s goals include participation in community activities, active participation in
its own committee meetings, monitoring of fiscal responsibility, demonstrating support of the
partnership agreement, and participation in training sessions. These goals were all in the pro-
cess of being met at the time of the review team’s fieldwork. An examination of the commit-
tee meeting minutes revealed that the group considered a wide range of items consistent with
its goals. The committee’s goals for 2015 were essentially an update of its 2014 goals with
the addition of a section on ethics, and 2016 goals were not provided to the review team. The
committee members were responding to a self-evaluation survey at the time of the review
team’s fieldwork.
Interviews with committee members indicated that good communication exists between them
and the provost/CEO and the special trustee. Members expressed concern with the length of
time required in the accreditation process; however, they basically understand the process.
Members also expressed that the current membership is committed and cohesive.
An examination of the meeting minutes for the last year revealed that some meetings lacked
a quorum.
The review team attended the March 21, 2016 Special Trustee’s Advisory Committee meet-
ing and observed that the members in attendance were informed, engaged, and took their role
as advisors seriously. At this meeting, the special trustee told the committee that, when the
elected Board of Trustees regains its duties and authority, there is no statutory authority for
the continuance of this group. The members seemed to understand and applauded the contin-
ued progress toward an accredited college.
12 ACCJC Standard IV
7. During the previous review period, the provost/CEO held a Strategic Planning Summit. Ap-
proximately 35 people attended. This was the first step in the formation of a Strategic Plan-
ning Committee with a membership of about 40 individuals. This work is continuing with
small groups to develop ideas on such topics as the vision, mission, planning process at the
center, and the center’s committee structure. It is envisioned as a working group that devel-
ops a strong connection between planning and budget. The actual meetings take place at vari-
ous community centers.
8. The center has established a shared governance committee structure to provide input to senior
management for decision-making.
FCMAT’s eighth progress report stated, “Despite these active committees, the review team
heard from all segments of the campus community, including students, classified staff, fac-
ulty, and managers, that at times senior management seems to listen but not hear what is
shared. The perception of some is that minds are often already made up and the consultation
process produces no changes. In any campus community, some individuals believe they have
been heard only when they see their exact suggestions acted on immediately. However, dur-
ing this review several individuals expressed concerns about shared governance. The district
should continue to work to improve this perception.”
FCMAT’s ninth progress report noted that this situation had improved. All constituents re-
ported that they felt their contributions were taken seriously and that senior management was
listening and hearing. The provost/CEO met regularly with the president of the Academic
Senate, and deans indicated they were able to provide a bridge in communication between the
faculty and upper management. The students stated that they were listened to and get results.
Interviews conducted with the same groups during this review period revealed a continued
and notable improvement in the perception of the effectiveness of shared governance at
the center. Virtually everyone spoke of the improved communications between and among
groups, particularly with upper level administration. Individuals expressed an understanding
of their advisory role, but also indicated that their input was used in decision-making.
During previous reviews, individuals at all levels of the organization indicated that feedback
to constituencies needed improvement. During this review, many individuals stated that it
is the responsibility of the members of the various committees and councils to ensure they
represent their constituents and report back to them about discussions and decisions. They
indicated that closing the communication loop is important so that people realize how their
ideas are used in decision-making. This improvement in the feedback provided to constitu-
ent groups is likely responsible for the improved perception of the effectiveness of the shared
governance process.
ACCJC Standard IV 13
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
14 ACCJC Standard IV
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard IV: Leadership and Governance
B. Board and Administrative Organizations – In addition to the leadership of individuals
and constituencies, institutions recognize the designated responsibilities of the govern-
ing board for setting policies and of the chief administrator for the effective operation of
the institution. Multi-college districts/systems clearly define the organizational roles of
the district/system and the colleges.
1. The institution has a governing board that is responsible for establishing policies to assure
the quality, integrity, and effectiveness of the student learning programs and services and the
financial stability of the institution. The governing board adheres to a clearly defined policy
for selecting and evaluating the chief administrator for the college or the district/system.
a. The governing board is an independent policy-making body that reflects the public interest
in board activities and decisions. Once the board reaches a decision, it acts as a whole. It
advocates for and defends the institution and protects it from undue influence or pressure.
b. The governing board establishes policies consistent with the mission statement to ensure
the quality, integrity, and improvement of student learning programs and services and the
resources necessary to support them.
c. The governing board has ultimate responsibility for educational quality, legal matters, and
financial integrity.
d. The institution or the governing board publishes the board bylaws and policies specifying
the board’s size, duties, responsibilities, structure, and operating procedures.
e. The governing board acts in a manner consistent with its policies and bylaws. The board
regularly evaluates its policies and practices and revises them as necessary.
f. The governing board has a program for board development and new member orientation.
It has a mechanism for providing for continuity or board membership and staggered terms
of office.
g. The governing board’s self-evaluation processes for assessing board performance are
clearly defined, implemented, and published in its policies or bylaws.
h. The governing board has a code of ethics that includes a clearly defined policy for dealing
with behavior that violates its code.
i. The governing board is informed about and involved in the accreditation process.
j. The governing board has the responsibility for selecting and evaluating the college chief
administrator (most often known as the president). The governing board delegates full
responsibility and authority to him/her to implement and administer board policies without
board interference and holds him/her accountable for the operation of the college.
2. The president has primary responsibility for the quality of the institution he/she leads. He/She
provides effective leadership in planning, organizing, budgeting, selecting and developing
personnel, and assessing institutional effectiveness.
a. The president plans, oversees, and evaluates an administrative structure organized and
staffed to reflect the institution’s purposes, size, and complexity. He/She delegates authority
to administrators and others consistent with their responsibilities, as appropriate.
ACCJC Standard IV 15
b. The president guides institutional improvement of the teaching and learning environment
by the following:
• establishing a collegial process that sets values, goals, and priorities;
• ensuring that evaluation and planning rely on high quality research and analysis on
external and internal conditions;
• ensuring that educational planning is integrated with resource planning and distribu-
tion to achieve student learning outcomes; and
• establishing procedures to evaluate overall institutional planning and implementation
efforts.
c. The president assures the implementation of statutes, regulations, and governing board
policies and assures that institutional practices are consistent with institutional mission
and policies.
d. The president effectively controls budget and expenditures.
e. The president works and communicates effectively with the communities served by the
institution.
3. DOES NOT APPLY – it addresses the multi-college district.
16 ACCJC Standard IV
Accrediting Commission
for Community and Junior April Jan. July June Jan. July June April April April April
2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
Colleges (ACCJC) Standard IV:
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Leadership and Governance
B. Board and Administrative Organizations
Standard to be Addressed
Community Relations - Community Relations and Governance
Board members refer informal
2.5 public concerns to the appropriate 3 3 3 5 7 6 7 8 8 9 9
staff for attention and response.
Board members are actively involved
2.9 2
in building community relations.
Policy - Community Relations and Governance
The college has established a system
4.5 of securing staff and citizen input in 2
policy development and review.
Board Roles/Boardsmanship - Community Relations and Governance
Board members participate in
orientation sessions, workshops,
conventions and special meetings
sponsored by board associations,
and have access to pertinent
5.2 1 1 3 5 7 6 6 6 6 7 9
literature, statutes, legal counsel
and recognized authorities to
understand duties, functions,
authority and responsibilities of
members.
The board has established a vision/
mission and uses that vision/mission
as a framework for college action
5.3 based on the identified needs of 3 3 3 6 7 7 8 8 7 8 9
the students, staff and educational
community through a needs
assessment process.
The board makes decisions based
on the study of all available data,
5.4 3 3 3 4 7 7 3 3 4 6 8
including the recommendations of
the president.
Functional working relations are
5.5 1 1 3 6 7 7 3 3 4 7 8
maintained among board members.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard IV 17
Accrediting Commission
for Community and Junior April Jan. July June Jan. July June April April April April
2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
Colleges (ACCJC) Standard IV:
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Leadership and Governance
Individual board members respect
the decisions of the board majority
5.6 1 1 3 6 7 6 3 3 4 6 8
and support the board’s actions in
public.
Functional working relations are
5.7 maintained between the board and 1 1 2 6 7 7 3 3 4 7 8
administration.
The board publicly demonstrates
5.8 respect for and support for the 1 1 2 6 7 7 3 3 4 7 8
district staff.
The board publicly demonstrates
5.9 respect for public input at meetings 1 1 2 6 7 7 5 4 5 7 8
and public hearings.
Board members respect
5.10 confidentiality of information 1 1 1 5 7 8 8 8 8 8 9
shared by the administration.
Board members do not involve
themselves in operational issues
5.11 1 1 1 5 7 7 7 8 8 9 9
that are the responsibility of the
president and staff.
The board acts for the community
5.12 and in the interest of all students in 1 1 2 5 7 7 5 5 5 6 8
the district.
Board Meetings - Community Relations and Governance
An adopted calendar of regular
meetings exists and is published
6.1 3
specifying the time, place and date of
each meeting.
The board agenda is made available
to the public in the manner and
6.2 4 4 4 6 8 6 5 6 7 7 6
under the time lines prescribed by
law.
Board members prepare for board
meetings by becoming familiar with
6.3 1 1 2 6 7 7 5 5 6 8 9
the agenda and support materials
prior to the meeting.
The standards in bold text are the identified subset of standards for ongoing reviews.
18 ACCJC Standard IV
Accrediting Commission
for Community and Junior April Jan. July June Jan. July June April April April April
2007 2008 2008 2009 2010 2010 2012 2013 2014 2015 2016
Colleges (ACCJC) Standard IV:
Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating Rating
Leadership and Governance
Board meetings are conducted
6.4 according to a set of bylaws adopted 1
by the board.
Open and closed sessions are
6.5 conducted according to the Ralph 5 5 5 6 7 7 7 8 9 9 9
M. Brown Act.
Board meetings proceed in a
6.6 businesslike manner while allowing 5 5 5 6 7 6 3 3 4 7 9
opportunity for full discussion.
The Board has adopted bylaws for
6.7 the placement of items on the board 4
agenda by members of the public.
Members of the public have an
opportunity to address the board
before or during the board’s
consideration of each item of
6.8 4 4 4 7 8 7 7 7 8 9 9
business to be discussed at regular
or special meetings and to bring
before the board matters that are
not on the agenda.
Board meetings focus on matters
6.9 related to student educational 1 1 1 3 7 5 5 6 6 8 9
attainment.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard IV 19
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 2.5 –
Community Relations
Professional Standard:
Board members refer informal public concerns to the appropriate staff for attention and response.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee has adopted Board Policy 2200, Board Duties and Responsibilities
(1/19/2010), which lists the board’s responsibilities and indicates that the board is to provide
policy, direction and guidance to the CEO, who is responsible for management of the district
and its employees.
2. The elected board members have each served on the Compton CCD board at least two years
and have been to board training workshops, some sponsored by California Community Col-
lege Trustees (CCCT). In addition they attend important statewide conferences and interact
with board members throughout the state. These opportunities have reinforced the necessity
of following best practices.
Interviews with each individual elected board member indicated they are aware of their role
regarding informal public concerns and route any operational concerns to appropriate district
personnel. As the elected board receives more opportunities to govern, through the special
trustee, it is important that they maintain this practice.
3. Interviews with district management staff did not reveal concerns in this area, and the review
team received no reports of board members being inappropriately involved in routine staff
matters.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
20 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.2 –
Board Roles/Boardsmanship
Professional Standard:
Board members participate in orientation sessions, workshops, conventions and special meetings
sponsored by board associations, and have access to pertinent literature, statutes, legal counsel and
recognized authorities to understand duties, functions, authority and responsibilities of members.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee adopted Board Policy 2740 (adopted 12/15/2009, revised
8/18/2015), Board Education. This policy states that the board is committed to its ongoing
development as a board and to a trustee education program that includes new trustee orienta-
tion.
2. A Board of Trustees election was held in November 2013. This election followed the redis-
tricting process; thus all five seats were open. Three new members were elected to the board,
and two former members were re-elected. Members continue to express a strong desire to
receive and participate in training on multiple subjects, including understanding their role.
One of the 2016 board goals is to participate in a trustee education program. The district has
developed a specific and thorough training agenda for board members. A goal is for the board
members to complete training on ethics and sexual harassment during 2016.
3. The board members and provost/CEO share the expectation that professional development
is critical to ensure understanding of the most pressing issues affecting community colleges,
and that training to understand the roles and responsibilities of board members is necessary
for the trustees to be fully effective. Individual members attend conferences. For example,
members attended the Community College League of California (CCLC) conference dur-
ing this review period. Members received training on the Brown Act and had a presentation
on parliamentary procedure that included role-playing. All trustees have either enrolled in or
completed the CCLC Effective Trusteeship Program. Several members attended the CCLC
Student Equity Conference. Interviews with board members revealed their continued desire
for training.
4. At present, the role of the board is limited because it has no rights, duties or powers, but the
board should continue to develop so it is ready to assume its complete role in the future. The
board should continue its commitment to training and look for training opportunities that will
help members fully understand the appropriate role and conduct of a board member at meet-
ings and when dealing with the public.
ACCJC Standard IV 21
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 6
April 2014 Rating: 6
April 2015 Rating: 7
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
22 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.3 –
Board Roles/Boardsmanship
Professional Standard:
The board has established a vision/mission and uses that vision/mission as a framework for college
action based on the identified needs of the students, staff and educational community through a
needs assessment process.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton CCD has adopted a vision and mission statement (Board Policy 1200, Mis-
sion, Vision, and Strategic Initiatives, adopted 10/20/2009, revised 12/15/2015) that serves
as a framework for planning documents across the institution. This statement was developed
with input from faculty and staff, students, administrators, and the Board of Trustees. The
document lays out the main themes that should be the strategic focus of the district for the
short- and mid-term and should serve as the basis for allocating resources. During this review
period, the mission statement, vision and strategic plan have all been reviewed. The provost/
CEO and Board of Trustees should continue to periodically revisit this board policy to en-
sure it reflects the district’s current needs and priorities for all faculty and students and use
the policy to guide planning and budgeting decisions. A regular cycle for its review has been
established, and as recommended in previous reviews, a three-year cycle has been developed
for the review of all board policies and administrative regulations and procedures. Appropri-
ate offices have been given review assignments, and the Consultative Council will review the
process.
2. The Planning and Budget Committee, a committee of the Consultative Council, has as part
of its purpose statement on the 2015-2016 Standing Committees’ document “assures that the
planning and budgeting are interlinked and that the process is driven by the institutional pri-
orities set forth in the Educational Master Plan and other plans adopted by the District. The
PBC ensures that all plans are developed using data from program review and are linked to
the Center’s mission statement and strategic initiatives. The PBC makes recommendations
with respect to all global Center and District planning and budgeting issues.” The commit-
tee’s budget augmentation criteria include the center’s goals for meeting students’ needs and
fostering student success.
ACCJC Standard IV 23
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 7
April 2015 Rating: 8
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
24 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.4 –
Board Roles/Boardsmanship
Professional Standard:
The board makes decisions based on the study of all available data, including the recommendations
of the president.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board Policy 2740, Board Education (adopted 12/15/2009, revised 8/18/2015), states that the
Board of Trustees will engage in study sessions. An examination of board meeting agendas
shows that, although study sessions have not been scheduled recently, reports to the board
on district matters are scheduled frequently. In addition, at the time of FCMAT’s fieldwork a
2016-17 budget workshop was scheduled for April 19, 2016. The district should also consider
providing separate study sessions to the board members regarding other detailed topics.
2. The provost/CEO and staff deliver background information and data in advance of public
meetings to ensure the opportunity to review materials and ask questions. Staff members
routinely provide reports and presentations at board meetings. For example, the board has re-
ceived reports on the status of accreditation, budget development, professional development,
financial aid, audits, construction projects and student learning outcomes. In addition, regular
reports from the various college constituencies are scheduled. Staff should continue to pro-
vide reports to the board to help ensure its effectiveness as an advisory body.
3. The review team attended the March 22, 2016 Board of Trustees meeting. The board mem-
bers acted in a very professional manner at this meeting. Interviews and review of the 2015-
16 board meeting minutes revealed an informed and interested board.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 3
April 2014 Rating: 4
April 2015 Rating: 6
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 25
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.5 –
Board Roles/Boardsmanship
Professional Standard:
Functional working relations are maintained among board members.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board members participate in public meetings in an advisory capacity. A Board of Trustees
election was held in November 2013. This election followed the redistricting process; thus all
seats were open. Three new members were elected to the board. Together with two re-elected
members, the board is at its full membership of five.
Interviews and review of the board meeting minutes indicated that the board is continuing to
develop a functional working relationship. The board members need to continue to develop
this relationship to ensure they effectively fulfill their advisory role.
2. Board members’ participation in the statewide conference of community college trustees is
providing the board members with a solid foundation on which to build functional working
relations with one another. Interviews with the board members indicated that they feel a good
working relationship is important and is continuing to develop.
3. The review team attended the March 22, 2016 Board of Trustees meeting. The board mem-
bers acted in a very professional manner at this meeting. Interviews and review of the 2015-
16 board meeting minutes revealed an interested and informed board. Although agenda items
can at times be extremely sensitive matters to board members, their conduct at meetings re-
mains professional.
4. The board should continue to work to fully understand the appropriate role and conduct of a
board member both at meetings and when dealing with the public.
Participation in training and professional development opportunities should be a routine ex-
pectation for board members. It should help to enhance their ability to set the tone and direc-
tion for the district and function cohesively as a board when the district regains local author-
ity to govern areas of operations.
5. Beginning in July 2014, the board members were seated at the dais for all meetings. Inter-
views with individual board members indicated that this change resulted in a more engaged
and positive board. In July 2015, the role of the board members was expanded to allow them
to attend closed sessions and to make and second motions at board meetings. This has been
an important step in preparation for the return of rights, duties, and powers to the Board of
Trustees. All the members indicated that the tone of meetings is collegial. It is critical that the
members continue to exhibit this preparation, decorum, and professionalism that will demon-
strate their readiness to assume a full role when the district regains local authority to govern
areas of operations.
26 ACCJC Standard IV
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 3
April 2014 Rating: 4
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 27
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.6 –
Board Roles/Boardsmanship
Professional Standard:
Individual board members respect the decisions of the board majority and support the board’s actions
in public.
Progress on Implementing the Recommendations of the Recovery Plan:
1. As of the November 2013 election, the elected board has three new members and two re-
elected members. Having a fully elected board demonstrates that the community wants to be
involved and engaged in the Compton Center and the district. The board members participate
in public meetings in an advisory capacity. The board members are continuing the progress
they have made in working together and with the special trustee to ensure they effectively
fulfill this advisory role in preparation to assume the decision-making role in the future.
The agenda for orientation, training, and professional development for the board should con-
tinue to enhance their understanding of their roles and responsibilities, improve the board’s
ability to set direction for the district, and heighten their ability to communicate in a profes-
sional and respectful manner, with meeting discussion focused on relevant topics.
2. The board/special trustee adopted Board Policy 2715, Code of Ethics and Standards of Prac-
tice, dated 11/16/2010 and revised 11/13/2012. The policy states in part, “Board members
recognize that legal and effective functioning is by the board as a whole. District matters are
not governed by individual actions of Board members. When acting as Board members, trust-
ees speak and act on behalf of the district, not as individuals. Board members use care not to
misrepresent their individual opinions or actions as those of the Board.”
Individual board members stated that they work well together and, although they may not al-
ways agree, they develop a consensus and “stick together.”
The board needs to continue to develop a coherent, unified voice and a cooperative work-
ing relationship. Its members must completely understand and support the recovery plan, the
MOU that describes the relationship between the Compton Center, Compton CCD and El
Camino CCD, and the process to accreditation and be able to articulate them to the public.
3. See Standard 5.5, item #5.
28 ACCJC Standard IV
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 3
April 2014 Rating: 4
April 2015 Rating: 6
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 29
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.7 –
Board Roles/Boardsmanship
Professional Standard:
Functional working relations are maintained between the board and administration.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The provost/CEO and special trustee continue to meet with and talk to board members to re-
view operational issues. The elected board is also given extensive written documentation for
each board meeting and for significant operational issues.
2. The board members are able to discuss issues in advance of the board meetings with the pro-
vost/CEO and, thus, are well informed about the issues.
3. The team observed, and administration confirmed, that the board members ask pertinent
questions and are respectful and engaged at board meetings. Interviews with board members
and staff also indicated that the working relationship between the administration and board is
functional and professional.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 3
April 2014 Rating: 4
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
30 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.8 –
Board Roles/Boardsmanship
Professional Standard:
The board publicly demonstrates respect for and support for the district staff.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The review team attended the March 22, 2016 board meeting at which all but the student
member were present. Board members conducted themselves in an appropriate, professional
manner. The development of a good working relationship with each other, staff, and admin-
istration; respect for district staff; respect for the majority opinion; and the general tenor of
board meetings has continued to improve during this review period.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 3
April 2014 Rating: 4
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 31
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.9 –
Board Roles/Boardsmanship
Professional Standard:
The board publicly demonstrates respect for public input at meetings and public hearings.
Progress on Implementing the Recommendations of the Recovery Plan:
1. With respect to public input, board meetings are conducted in a professional and businesslike
manner, with the board serving in an advisory capacity. Professional development through
conference attendance and in-service training continues to provide board members with the
understanding of their responsibilities, allowing them to effectively fulfill their roles.
2. Board minutes showed that time for public comments is provided at meetings and that mem-
bers of the public comment on items at some meetings. It is important that board members
not directly engage in conversations with members of the public during board meetings but
instead direct their comments to the special trustee and district administration. The board
members evidenced appropriate behavior in this regard at the March 22, 2016 meeting at-
tended by the team. The provost/CEO should continue to ensure that opportunities for input
are widely publicized, and the board should maintain these practices when governing author-
ity is returned.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 4
April 2014 Rating: 5
April 2015 Rating: 7
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
32 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.10 –
Board Roles/Boardsmanship
Professional Standard:
Board members respect confidentiality of information shared by the administration.
Progress on Implementing the Recommendations of the Recovery Plan:
1. Since July 2015 the board members have participated in closed session discussions, and have
been privy to confidential information. The special trustee indicated that there have been
no concerns about board members breaching the confidentiality of information presented to
them. The orientation and ongoing training agenda for board members includes information
on the Brown Act and on confidentiality. Board members should continue to receive training
in this area and continue to treat confidential information in an appropriate manner.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
April 2014 Rating: 8
April 2015 Rating: 8
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 33
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.11 –
Board Roles/Boardsmanship
Professional Standard:
Board members do not involve themselves in operational issues that are the responsibility of the
president and staff.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee has adopted several board policies that delegate operational issues
to the appropriate staff. Board Policy 2200, Board Duties and Responsibilities (1/19/2010),
delegates power and authority to the CEO to effectively lead the district and indicates that the
board will respect the authority of the CEO by providing policy, direction, and guidance only
to the CEO, who is responsible for the management of the district and its employees. Board
Policy 2430, Delegation of Authority to the CEO (11/17/2009), delegates executive responsi-
bility to the CEO for administering policies adopted by the board and executing all decisions
of the board requiring administrative action. Board Policy 6100, Delegation of Authority
(2/17/2009), specifically delegates authority to the CEO to supervise the general business and
fiscal affairs of the district. Board Policy 7110, Delegation of Authority, Human Resources
(10/20/2009), delegates to the CEO the authority to employ personnel, fix job responsibilities
and perform other personnel actions subject to ratification by the board. With these adoptions,
the board has in place the framework for meeting this standard.
2. The team received no reports of board members being inappropriately involved in routine
staff matters, and the board members indicated they route any operational concerns to appro-
priate district personnel. Staff confirmed this.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
34 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.12 –
Board Roles/Boardsmanship
Professional Standard:
The board acts for the community and in the interest of all students in the district.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee adopted Board Policy 2200, Board Duties and Responsibilities,
dated January 19, 2010, which states in part that the board is committed to fulfilling its re-
sponsibilities to represent the public interest.
In representing the public interest, the board must speak with a coherent, unified voice. It is
in the best interest of the community and students for the board to completely understand and
support the recovery plan; the MOU that describes the relationship between the Compton
Center, Compton CCD and El Camino CCD; and the process to accreditation, and be able to
articulate them to the public.
2. At present, the role of the board is limited because it has no rights, duties or powers. Howev-
er, since July 2015, the board has assumed a greater role in district governance as described
in Standard 5.5 item #5. The board should continue to develop so it is ready to assume its
complete role in the future.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 5
April 2014 Rating: 5
April 2015 Rating: 6
April 2016 Rating: 8
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 35
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.2 –
Board Meetings
Legal Standard:
The board agenda is made available to the public in the manner and under the time lines prescribed
by law. (Government Code 54954.1, 54954.2)
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board agendas are posted on the district’s website at least 72 hours prior to the regular board
meeting. The website states, “Effective August 19, 2014, all meeting agendas will be avail-
able here.” By clicking on the site, a person can access all board agendas. In the past the
agendas were also posted on a bulletin space in front of the provost/CEO’s office. During
fieldwork for this review period, the team found that the agenda was posted on the bulletin
board the day before the board meeting. To fully comply with Government Code Section
54954.2, the agenda should be posted “in a location that is freely accessible to members of
the public and on the local agency’s Internet Web site, if the local agency has one.”
The district has moved to an electronic, paperless system for providing meeting agendas and
supporting documents to the board members. In addition, copies of the agenda and full board
packets are available at the board meetings.
2. District administration reported that agendas are posted at least 24 hours prior to special
board meetings as required by Government Code Section 54956.
3. The provost/CEO indicated that the website is in need of updating and redesigning for easier
access, and the study team also found it was not easy to locate board meeting materials on-
line. The district should continue to pursue website updates for ease of access by both the
campus community and the public.
4. At the time of FCMAT’s fieldwork, minutes for the April 28, July 8, and October 7, 2015
special board meetings had not been presented to the board/special trustee for approval. All
board meeting minutes should be presented for approval at the subsequent regular board
meeting.
5. A schedule of board meeting dates appears on the Board of Trustees page of the district web-
site, which allows interested members of the public and Compton CCD employees to plan
their schedules should they wish to attend.
36 ACCJC Standard IV
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 8
July 2010 Rating: 6
June 2012 Rating: 5
April 2013 Rating: 6
April 2014 Rating: 7
April 2015 Rating: 7
April 2016 Rating: 6
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 37
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.3 – Board Meetings
Professional Standard:
Board members prepare for board meetings by becoming familiar with the agenda and support mate-
rials prior to the meeting.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The review team attended the regularly scheduled elected Board of Trustees meeting on
March 22, 2016. The team also attended the regularly scheduled meeting of the Special
Trustee’s Advisory Committee on March 21, 2016. At both meetings it was clear that the
elected board and the advisory committee were prepared for the meetings.
2. The special trustee and the provost/CEO indicated that the elected board members continue
to work hard to understand the issues and to work together as a board and not as five indi-
viduals. Because the board is limited to serving in an advisory capacity since a special trustee
has been appointed and the educational and student service programs fall under the purview
of the El Camino CCD board, they must limit the areas they discuss and concern themselves
with as a board.
3. Beginning July 2014, the board members sat at the dais for all meetings but they did not
make motions, vote on agenda items or attend closed session. In July 2015, the special trustee
invited the board to perform these functions, and at the March 22, 2016 meeting attended by
the review team, the board members attended closed session, made and seconded motions,
voted on agenda items and were more actively engaged in discussion of agenda items. The
board president conducted the meeting and invited board member participation in discussion
and then in voting.
Interviews with board members indicated that they are pleased with the opportunity to en-
gage more fully as individual members and as a collective board. Each felt the board has
grown in its understanding of its role and in working together on behalf of the Compton Dis-
trict.
Trustees confirmed that they meet with the provost/CEO and special trustee for guidance
when needed. The members seem more at ease in their roles and discuss and debate issues
with each other at board meetings. Interviews with board members also indicated that they
read the board material in advance of the meetings and are fully prepared and informed to
discuss agenda items at the meetings.
Three of the five board seats are up for election in November 2017.
4. The special trustee and the provost/CEO continue to provide board training for the elected
board. Interviews with board members indicated that the trainings are helpful and well-
received. Each of the elected board members expressed their eagerness to assist the center in
working toward accreditation.
38 ACCJC Standard IV
5. During a prior review period, the special trustee sought applications from the community to
serve on the Special Trustee’s Advisory Committee and provide advice. The purpose of the
committee, as outlined in Assembly Bill 318 and stated in the Special Trustee’s Advisory
Committee document dated March 24, 2015, is as follows: “The CCCD Special Trustee’s Ad-
visory Committee is organized to advise the Special Trustee with respect to the management
of the Compton Community College District.” Currently the committee has eight members
(including one student). Committee meetings are coordinated by an elected chair and vice
chair, and are led by the chair.
The review team attended the committee meeting on March 21, 2016 and found it to be well
run and productive. All but the student member were in attendance at the meeting. Agenda
items included a review and approval of prior meeting minutes; an accreditation update; and
discussion/information items regarding the CCCD 2014-15 financial audit, the 2014-15 Mea-
sure CC general obligation bond audit and performance audit, the Compton District com-
munity outreach, and the Special Trustee’s Advisory Committee bylaws. Interviews with two
committee members indicated a clear sense of commitment to the district among the mem-
bers. Members have varying backgrounds and represent different communities in the Comp-
ton CCD’s service area.
Interviews with administrators indicated that six members of the committee completed their
self-evaluations with all scores falling in the strongly agree or agree category. Information on
the progress toward accreditation was discussed during the self-evaluation process with the
suggestion that committee members share this with their communities so that correct infor-
mation is presented.
6. Interviews with elected board members and members of the Special Trustee’s Advisory Com-
mittee indicated that the groups work collaboratively with one another and are committed to
making progress with the accreditation issue.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 5
April 2014 Rating: 6
April 2015 Rating: 8
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 39
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.5 – Board Meetings
Legal Standard:
Open and closed sessions are conducted according to the Ralph M. Brown Act. (Government Code
54950 et seq.)
Progress on Implementing the Recommendations of the Recovery Plan:
1. Closed session is held immediately after opening the board meeting. Open session occurs
afterward and a report of any action taken in closed session is provided. The elected board
members now attend closed session and thus are involved with confidential issues related to
the district.
Interviews with the provost/CEO and special trustee indicated that the board members handle
the confidential nature of closed session discussions appropriately.
2. Information presented indicated that board meetings adhere to the Brown Act.
3. See Standard 6.2.
Standard Implemented: Fully – Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
April 2014 Rating: 9
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
40 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.6 – Board Meetings
Professional Standard:
Board meetings proceed in a businesslike manner while allowing opportunity for full discussion.
Progress on Implementing the Recommendations of the Recovery Plan:
1. At the March 22, 2016 board meeting, the board conducted itself appropriately. All five mem-
bers were present and engaged. The sitting elected board has been working together for ap-
proximately two years. Interviews with board members revealed that each member is pleased
with the opportunity to function more fully in the business of governing. The board members
were engaged in the meeting and appeared comfortable with their roles. The tension experi-
enced at meetings during some previous visits was no longer apparent.
The meeting was organized and conducted in a professional manner with members listening
to one another, the special trustee, and the provost/CEO. The agenda contained a variety of
action and discussion items.
2. The March 22, 2016 agenda included numerous items. Several constituent representatives at-
tended the meeting but only the associated student body representative provided a report. Al-
though it is up to the individual constituent representative whether or not to provide a report,
in the interest of communication, occasional updates should be provided at board meetings.
Action items included the California Community College Trustees board elections; a ground
lease and joint occupancy agreement; student health clinic services agreement; facilities,
planning, and development contracts; and change orders. The board members asked ques-
tions and commented as appropriate.
Numerous discussion and information items were on the agenda, including the board’s goals
for 2016; a list of the presentations and reports scheduled for 2016; administrative regula-
tions; full-time equivalent student goals and actuals for 2015-16; and financial items such as
the bond fund budgets, quarterly financial status report and the enrollment management plan.
Board members commented or asked questions that demonstrated they had read the material
and were prepared to discuss and vote on each item.
3. The professional protocol used at the March 22, 2016 board meeting continued to be bet-
ter than it had been at meetings during some previous review periods. Board members were
clearly prepared, stayed on topic, and asked questions if uncertain.
ACCJC Standard IV 41
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 3
April 2014 Rating: 4
April 2015 Rating: 7
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
42 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.8 – Board Meetings
Legal Standard:
Members of the public have an opportunity to address the board before or during the board’s consid-
eration of each item of business to be discussed at regular or special meetings and to bring before the
board matters that are not on the agenda (Education Code 35145.5).
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board Policy 2350, Public Participation (adopted 10/20/2009, revised 7/21/2015), outlines
the three ways in which a member of the public may address the board. A member of the
public may submit a request to address the board on a non-agenda item by presenting that
request in writing at least 10 minutes prior to the start of the meeting. A request may be sub-
mitted to the CEO at least 18 days prior to a regular board meeting requesting that an item be
placed on the agenda, as provided in Board Policy 2340, Agendas (10/20/2009). A member of
the public may submit a written communication to the board regarding an agenda item and/or
request to speak on the item at the meeting; written communications regarding agenda items
are to be received at least 24 hours prior to the meeting.
2. Board agendas and minutes indicate that the public is provided an opportunity to address the
board at meetings. The special trustee and the provost/CEO indicated that at some meetings
several members of the public address the board on both agenda and non-agenda items.
3. Included in the March 22, 2016 board packet for information was a copy of Board Policy
2350, Public Participation. It includes the process for speaking on an issue and protocol for
behavior at board meetings.
Standard Implemented: Fully - Substantially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
April 2014 Rating: 8
April 2015 Rating: 9
April 2016 Rating: 9
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 43
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.9 – Board Meetings
Professional Standard:
Board meetings focus on matters related to student educational attainment.
Progress on Implementing the Recommendations of the Recovery Plan:
1. A review of board agendas and minutes revealed that all constituency group leaders continue
to have time on the agenda to discuss issues and successes in their areas. Senior management
had a variety of issues on the agenda for the March 22, 2016 board meeting, including the
center’s Student Equity Plan, which relates to student success; an agreement for the partner-
ship between the Compton CCD and Molina Medical Management, Inc. for student health
clinic services; and the 2015-2018 Enrollment Management Plan.
The team continues to recommend the incorporation of this information in the minutes be-
cause it is a good way to promote the center’s educational agenda.
2. The provost/CEO and, when appropriate, the special trustee and others, report at each board
meeting on items of interest at the Compton Center and to the district. Some of these items
pertain to student educational attainment. For example, the dean of student learning presented
a report on the Tri City Adult Education Consortium at the March 22, 2016 meeting.
3. The provost/CEO invites appropriate personnel to discuss progress in their area as it affects
student success. For example, at the March 22, 2016 meeting, the associated student body
president provided an update on student body clubs and organizations, which showcased the
learning opportunities for students who get involved in campus activities.
A review of the 2015-16 board minutes found that most meetings include reports on activi-
ties or programs that involve student learning and student achievement. These reports include
particular educational programs, facilities that directly affect student learning, programs fo-
cused on student support efforts and the new Institutional Educational Program Initiative.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 7
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 6
April 2014 Rating: 6
April 2015 Rating: 8
April 2016 Rating: 9
44 ACCJC Standard IV
0 1 2 3 4 5 6 7 8 9 10
Implementation Scale:
Not Fully
ACCJC Standard IV 45
Sources and Documentation
Interviews and Meetings:
Academic deans
Associated Student Body members
Board of Trustees members (individual meetings)
Classified union president
Faculty leaders (Academic Senate and certificated union)
Faculty, staff and administrators
Institutional Effectiveness Committee members
Planning and Budget Committee members
Provost/chief executive officer
Public relations officer, El Camino Community College District
Special trustee
Special Trustee’s Advisory Committee members (two individual members)
Superintendent/president, El Camino Community College District
Superintendent, Lynwood Unified School District
Vice president, El Camino College Compton Center
Board of Trustees meeting, March 22, 2016
Consultative Council special meeting, March 21, 2016
Special Trustee’s Advisory Committee meeting, March 21, 2016
District Documents:
Board policies and administrative regulations and procedures regarding governance
Compton Community College District 2015-2016 Standing Committees, March 10, 2016
Consultative Council meeting agendas and minutes, April 2015-March 2016
Planning and Budget Committee meeting agendas and minutes, April 2015-March 2016
CCCD/ECCD CEC 2015-2016 Organizational Structure (no date)
El Camino College Compton Center 2017 Accreditation Self-Evaluation Plan for Candidacy Applica-
tion, March 10, 2016
El Camino College Compton Center Enrollment Management Plan 2015-2018, January 1, 2016
46 ACCJC Standard IV
El Camino College Compton Center 2015-2016 Overarching Priorities
Institutional Effectiveness Partnership Initiative (Proposed Plan), March 2016
Film/Video and New Media Program Advisory Committee Minutes
Board of Trustees meeting agendas, minutes, and supplementary material, April 2015-March 2016
Special Trustee’s Advisory Committee meeting agendas and minutes, April 2015-March 2016
Other:
Compton Community College District website (www.district.compton.edu)
El Camino College Compton Center website (www.compton.edu)
ACCJC Standard IV 47