FCMAT
Comprehensive Follow-Up Review
Read the report at Compton Community College District ↗
Compton Community College District
Comprehensive Assessment
Seventh Progress Report
October 2013
Table of Contents
Executive Summary
ACCJC Standard I: Institutional Mission and Effectiveness
Standard I-A: Mission
Standard I-B: Improving Institutional Effectiveness
ACCJC Standard II: Student Learning Programs and Services
Standard II-A: Instructional Programs
Standard II-B: Student Support Services
Standard II-C: Library and Learning Support Services
ACCJC Standard III: Resources
Standard III-B: Physical Resources
Standard III-C: Technology Resources
Standard III-D: Financial Resources
ACCJC Standard IV: Leadership and Governance
Standard IV-A: Decision-Making Roles and Processes
Standard IV-B: Board and Administrative Organizations
Introduction
This seventh progress report for the Compton Community College District (Compton CCD) provides
the latest in a series of periodic assessments conducted by the Fiscal Crisis and Management Assis-
tance Team (FCMAT) of the district’s progress in implementing the recommendations made in the
initial Compton CCD Comprehensive Review conducted by FCMAT in April 2007.
Background
On June 30, 2006, Assembly Bill (AB) 318 provided a state loan (line of credit) of $30 million to
the Compton CCD and mandated that FCMAT conduct a comprehensive assessment of the district
in five operational areas and develop a recovery plan for the district. The five operational areas are
Academic Achievement, Community Relations/Governance,
Facilities Management, Financial Management, and Personnel
“... the accreditation process
Management. FCMAT standards for the five operational areas
is separate and distinct from
have been associated with similar Accrediting Commission for
the legislatively mandated Community and Junior Colleges (ACCJC) accreditation stan-
requirements of AB 318 and dards to assist the district with recovery and regaining accredi-
tation. However, the ACCJC accreditation process is separate
assessment by FCMAT.”
and distinct from the legislatively mandated requirements of
AB 318 and assessment by FCMAT.
FCMAT is required to file written status reports at regular intervals on the district’s progress in
implementing the recovery plan. The bill authorizes the Board of Governors of the California Com-
munity Colleges to suspend the authority of the Board of Trustees of the Compton Community
College District for up to five years, plus a period lasting until the Chancellor, FCMAT, Director of
Finance and the Governor concur with the special trustee that the district has sustained the progress
and requirements of the assessment and recovery plan for two consecutive academic years, as pro-
vided in Education Code Sections 41329.59 and 71093.
In a letter dated July 21, 2006, the ACCJC notified the Compton CCD that the accreditation of Comp-
ton Community College would terminate on August 22, 2006. The letter also required the Compton
CCD to notify its students that the college’s accreditation had been revoked. Under the authority of
AB 318 and Education Code Section 74292 (d), the Compton CCD identified a partner district, the
El Camino Community College District (El Camino CCD) that agreed to provide accredited instruc-
tional programs to students at the Compton Center. Under this partnership, instructional services are
provided on the Compton CCD site by the El Camino Community College District Compton Com-
munity Educational Center (Compton Center) primarily to residents of Compton, Carson, Lynwood,
Paramount, and parts of north Long Beach.
A Memorandum of Understanding (MOU) signed in August 2006 and updated in July 2008 as an
“Agreement Between the El Camino CCD and the Compton CCD” outlines the agreement between the
districts, and continues to be a redefined working document. The 2008 agreement is being updated by
the parties to reflect the spirit of AB 318 and the relationship between the state, the El Camino CCD and
the Compton CCD. The current agreement for the Compton Center includes operations under the direct
management of El Camino CCD through a vice president on the Compton Center site who reports to the
superintendent/president of El Camino CCD for the operational aspects of the Compton Center includ-
ing its instructional programs and student services. Business services, facilities, personnel, governance
Compton Community College District 1
components and other programs and services are managed by the Compton CCD’s chief executive of-
ficer (CEO). The CEO reports to the state special trustee for the Compton CCD.
A formal Senior Management Group has been established and is composed of the El Camino CCD
president, state special trustee, El Camino College vice president for the Compton Center, and the
Compton CCD CEO. The management group is co-chaired by the El Camino CCD vice president
for the Compton Center and the CEO for the Compton CCD. The goals and objectives of the Senior
Management Group are to monitor and assist the Compton Center and the Compton CCD in meeting
ACCJC eligibility requirements, standards and commission policies.
The provisions of AB 318 and the subsequent loss of the Compton Community College’s accredita-
tion are unprecedented and have necessitated an extremely complex governance and organizational
structure to allow the partnering district to offer accredited courses. Compton Community College
is the first California public community college to lose its accreditation, have a special trustee ap-
pointed to administer the college district, have the authority of its elected governing board suspended
by legislation, and receive a multimillion-dollar state loan to continue operations. The transition of
instructional procedures and systems has been challenging, including establishing the proper report-
ing relationships, lines of communication, and the appropriate names and references for the Compton
Center, operating under the auspices of the El Camino CCD.
As the Compton CCD continues to address the operational deficiencies that led to the loss of both
local governance and accreditation, FCMAT’s work with the district and the Compton Center is in-
tended to assist the district in improving its basic operations and preparing for an eventual return to
local governance.
FCMAT has developed a set of legal and professional standards to provide a standards-based assess-
ment process for these reviews and has endeavored to associate these standards with similar stan-
dards of the ACCJC. This standards-based process and a rubric to rate the standards is explained in
the following sections of this report.
Use of FCMAT Professional and Legal Standards
Since 1993 the Fiscal Crisis and Management Assistance Team (FCMAT) has been engaged in
assisting California K-12 school districts under state administration to return to local governance.
FCMAT developed a standards-based assessment tool as part of this work, and has adapted it for use
in assessing and monitoring the Compton CCD. FCMAT professional and legal standards are being
used to help the Compton CCD maintain fiscal solvency, improve operations and move toward recov-
ery in each operational area.
For each ACCJC standard, appropriate FCMAT standards from the operational areas of Community
Relations and Governance, Academic Achievement, Personnel Management, Financial Management
and Facilities Management have been used to measure district progress. However, the ACCJC will
conduct its own independent review to determine when accreditation will be restored to the Compton
Center.
Each professional and legal standard has been scored, on a scale of 0 to 10, as to the Compton CCD’s
implementation of the standard at this point in time. These ratings provide a basis for measuring the
district’s progress in subsequent reporting periods.
2 Fiscal Crisis and Management Assistance Team
The following represents a definition of terms and scaled scores. The single purpose of the scaled
score is to establish the baseline of information by which the district’s future gains and achievements
in each of the standards can be measured over time.
Not Implemented (Scaled Score of 0)
There is no significant evidence that the standard is implemented.
Partially Implemented (Scaled Score of 1 through 7)
A partially implemented standard lacks completeness, and it is met in a limited degree. The degree of
completeness varies as defined:
1. Some design or research regarding the standard is in place that supports preliminary
development. (Scaled Score of 1)
2. Implementation of the standard is well into the development stage. Appropriate staff is
engaged and there is a plan for implementation. (Scaled Score of 2)
3. A plan to address the standard is fully developed, and the standard is in the beginning phase
of implementation. (Scaled Score of 3)
4. Staff is engaged in the implementation of most elements of the standard. (Scaled Score of 4)
5. Staff is engaged in the implementation of the standard. All standard elements are developed
and are in the implementation phase. (Scaled Score of 5)
6. Elements of the standard are implemented, monitored and becoming systematic. (Scaled
Score of 6)
7. All elements of the standard are fully implemented, are being monitored, and appropriate
adjustments are taking place. (Scaled Score of 7)
Fully Implemented (Scaled Score of 8-10)
A fully implemented standard is complete relative to the following criteria:
8. All elements of the standard are fully and substantially implemented and are sustainable.
(Scaled Score of 8)
9. All elements of the standard are fully and substantially implemented and have been sustained
for a full school year. (Scaled Score of 9)
10. All elements of the standard are fully implemented, are being sustained with high quality, are
being refined, and have a process for ongoing evaluation. (Scaled Score of 10)
Study Team
The FCMAT team and partners for this seventh progress review included the following agencies and
individuals.
Administration and Report Writing – Fiscal Crisis and Management Assistance Team
• Diane Branham, Chief Management Analyst
• Laura Haywood, Technical Writer
Academic Achievement – College Brain Trust
• Shirley Kelly, Retired Community College President
• Peggy Moore, Retired Community College Vice President of Instruction
Compton Community College District 3
Personnel Management – no longer reviewed by FCMAT or included in the progress report
Facilities Management – Fiscal Crisis and Management Assistance Team
• John Von Flue, Fiscal Intervention Specialist
• Eric D. Smith, Fiscal Intervention Specialist
Financial Management – Fiscal Crisis and Management Assistance Team
• Marisa Ploog, CPA, CFE, CGMA, CICA, Fiscal Intervention Specialist
• Julie Auvil, CPA, CGMA, Fiscal Intervention Specialist
• Debbie Martin, CPA, Director of Accounting Services, Kern Community College District*
Community Relations and Governance – College Brain Trust
• Shirley Kelly, Retired Community College President
• Peggy Moore, Retired Community College Vice President of Instruction
*As a member of this study team, this consultant was not representing her respective employer but
was working solely as an independent contractor for FCMAT.
4 Fiscal Crisis and Management Assistance Team
Executive Summary
Summary of Progress
As described in this seventh progress report, improvement has been noted and the average ratings of
the standards in the operational areas of Academic Achievement, Financial Management and Com-
munity Relations/Governance of the Compton CCD and the El Camino Community College District
Compton Community Educational Center (Compton Center) have increased during this reporting
period. However, the operational areas of Financial Management and Community Relations/Gover-
nance continue to include some standards with ratings that are less than four. The average rating in
the operational area of Facilities Management has remained the same compared with the previous
reporting period, and one standard has a rating that is less than four.
The partnership between the Compton CCD and the El Camino CCD continues to evolve under
the leadership of the state special trustee, chief executive officer and El Camino College executive
management team. Specific organizational roles and responsibilities of the governing entities and
administrators continue to evolve and be clarified as they apply to the Compton CCD and the Comp-
ton Center. Reporting relationships are clearly communicated for all faculty, staff and students to
navigate properly.
From a governance perspective, the special trustee provides decision making authority in lieu of the
Compton CCD elected governing board and personnel commission. The CEO of the Compton CCD
reports directly to the state special trustee, and the El Camino College vice president of the Compton
Center reports to the superintendent/president of the El Camino CCD. This organizational structure
is reflected in Administrative Regulation 3101, Management Organization Chart, dated March 15,
2010. Compton CCD requires active leadership from both the special trustee and the CEO to assist
the district in developing and sustaining the internal capacity required to eventually return the dis-
trict to local governance and regain the college’s accreditation.
Positive progress continues to be made in advancing long-range planning for the Compton Center.
The state special trustee, CEO and El Camino CCD executive management team have initiated
planning strategies, implemented needed improvements, and brought organizational balance to the
unique reporting structure of the governance partners. Provisions of the MOU continue to ensure
that the El Camino CCD Board of Trustees is engaged in issues of policy affecting students at the
Compton Center.
The state special trustee, the CEO and the chief business official (CBO) have been with the Compton
CCD during this entire review period, which has provided much-needed consistent, strong leadership
to the district. The CBO and the interim director of accounting have worked diligently to evaluate
business office functions, develop and implement written processes and procedures for the Business
Services Department, and increase internal controls. This has helped to improve fiscal practices and
increase ratings in many of the Financial Management standards.
The district continues to face challenges with its facilities and maintenance and operations functions.
Turnover in the Maintenance and Operations Department’s management position has continued dur-
ing this reporting period, and has contributed to the lack of progress in this operational area.
To achieve improvement in the Governance component of the comprehensive assessment, the elected
board members need to continue to develop more cooperative relationships with each other and be
consistently respectful to each other, the special trustee and administrative staff. Board members
Compton Community College District 5
need to deal with controversial and complex issues cooperatively and participate at board meetings in
a professional and respectful manner.
The recovery process for the Compton CCD and Compton Center requires much time and improve-
ment and will likely proceed incrementally. The partnership between the Compton CCD and the El
Camino CCD remains strong, and the entities continue to navigate through this unique and complex
circumstance.
FCMAT continues to anticipate that the Compton CCD, with the assistance of its partner, the El
Camino CCD, and the special trustee will continue to make the progress necessary for an even-
tual return to local governance. Although responding to the FCMAT standards provides the basis
of a review of district activities, it does not yield an accreditation self-study. The ACCJC has many
standards not covered by the FCMAT review. Furthermore, the requirement for documentation to
support the description of activities is very different. While the activities undertaken as part of the
FCMAT review will be useful to the institution, the ACCJC has a distinct and separate process from
FCMAT relative to accreditation.
Return to Local Governance
Assembly Bill (AB) 318 amended Education Code Section 71093 to allow the Board of Governors
to authorize the chancellor to suspend the authority of the Compton Community College District
Board of Trustees to exercise any powers or responsibilities or take any official actions with respect
to the district’s management. Suspension may be authorized for a period up to five years from the
effective date of AB 318 of the 2005-06 regular session, plus a period lasting until the Chancellor,
FCMAT, the Director of Finance, and the Governor concur with the special trustee that the district
has, for two consecutive academic years, met the requirements of the comprehensive assessment and
recovery plan.
The initial Compton Community College District Comprehensive Review, April 2007 assessed the
Compton CCD using 335 professional and legal standards in five areas of district operations. The
standards were aligned to the four standards of the ACCJC to develop specific recommendations for
operational improvements that would help prepare the district to return to fiscal solvency and local
governance and enhance its readiness to re-establish accreditation. Scaled scores were assigned for
each standard to provide a baseline measure of the district’s implementation of the standards as of
fall 2006. Each standard was measured and a scaled score from zero (not met) to 10 (fully met) was
applied.
To focus the district’s efforts on recovery, FCMAT selected a subset of these 335 standards in consul-
tation with the appointed special trustee. The standards were selected as having the highest probabil-
ity, if addressed successfully, to assist the Compton CCD with recovery. The 183 standards selected
are identified in bold print in the Tables of Standards in later sections of this report. They were the
focus of this visit and assessment, and will continue to be the focus of each progress review. An
average of the scores for the subset of standards in each of the operational areas was determined and
became the baseline of data against which the district’s progress can be measured over time, during
each review and assessment.
The district is not required to reach a scaled score of 10 in each of the selected standards, but is
expected to make steady progress that can be reasonably sustained. It is reasonable to expect that the
district can reach an average rating of at least a six, with no individual standard scored less than a
four, in the subset of FCMAT standards identified under ACCJC standards I, II and IV, and ACCJC
6 Fiscal Crisis and Management Assistance Team
standards III-A, III-B, and III-C/D. ACCJC Standard III, which deals with how the district manages
its resources, has been subdivided into three sections, to provide an average for the operational areas
of human resource (personnel) management, physical resource (facilities) management and financial
resource management.
When the average score of the subset of standards within an ACCJC standard or standard subdivision
reaches a level of six, progress is considered to be substantial and sustainable, no individual standard
in the subset is below a four, and the district has sustained the standards for two consecutive academ-
ic years, this particular operational area could be considered for return to the local district govern-
ing board, provided that the Community Relations/Governance standards have been substantially
met and are sustainable and that operational area has been returned to the local governing board. It
is conceivable that the Board of Trustees will regain local authority incrementally as the criteria are
met in each of the FCMAT standard areas.
During the prior review period, the Personnel Management operational area reached an average rat-
ing of six with no individual standard below a four, and the district had sustained these ratings for
two consecutive academic years. Therefore, this area was not reviewed by FCMAT nor included in
this seventh progress report.
During this review period, the Academic Achievement operational area has reached an average rat-
ing of six with no individual standard below a four, and the district has sustained these ratings for
two consecutive academic years. Therefore, FCMAT will no longer review this area nor include it in
future progress reports.
Because the required criteria have not been met for the Community Relations/Governance operational
area, governance of Personnel Management and Academic Achievement cannot be returned to the local
Board of Trustees and will remain with the special trustee until the provisions of AB 318 and Education
Code Section 71093 have been met. The return of legal powers and duties to the elected board is con-
tingent on meeting all of the prescribed requirements.
The ACCJC will conduct its own assessment to determine the eligibility requirements for accredi-
tation. The ACCJC accreditation process is separate and distinct from the legislatively mandated
requirements of AB 318 and assessment by FCMAT.
Recovery Plan
The Compton Community College District Comprehensive Review, April 2007 assessed the district
using 335 professional and legal standards and provided an in-depth review and a baseline score for
each standard. A subset of FCMAT standards that were similar in nature to the ACCJC’s four broad
topic areas was identified to assist the district in focusing its efforts to more successfully achieve re-
covery and a return to local governance. This subset of standards is the focus of this seventh progress
report and the ongoing progress reviews to be conducted in the future. Although all professional and
legal standards utilized in the comprehensive assessment process are important to any district’s suc-
cess, this identified subset of standards will enable the district to focus its efforts on making progress
toward recovery.
Following the initial comprehensive review in April 2007, FCMAT, with the collaboration of the
special trustee, identified a subset of 186 FCMAT standards in the four ACCJC standards areas to
be reviewed during each progress review. Three of those standards were eliminated during the third
Compton Community College District 7
progress review because they were repetitive of other standards or were not applicable to the college
or district. The 183 FCMAT standards included in this seventh progress report are:
• 27 (now 26) of 37 standards in ACCJC Standard I-A and I-B, Mission and Effectiveness
• 16 (now 15) of 28 standards in ACCJC Standard II-A, II-B and II-C, Student Learning
• 40 of 82 standards in ACCJC Standard III-A, Human Resources – no longer reviewed by
FCMAT or included in the progress report
• 41 (now 40) of 71 standards in ACCJC Standard III-B, Physical Resources
• 41 of 88 standards in ACCJC Standard III-C, Technology, and III-D, Financial Resources
• 21 of 29 standards in ACCJC Standard IV-A and IV-B, Leadership and Governance
The subset of standards is identified in bold print in the Table of Standards displayed in each ACCJC
standard section. Each progress review assesses only the identified subset of standards.
Later sections of this report provide greater detail on each of the standards in the identified subset of
standards. For each standard, a description is provided of the district’s progress in implementing the
standard, and a rating, on a scale of 0-10, is provided of the district’s progress at this point in time.
Summary Table of Progress
An average of the identified subset of FCMAT standards within each ACCJC standard area was
calculated to provide a summary of the district’s progress in that area. The average ratings from the
Compton Community College District Comprehensive Report, April 2007 of the identified subset
of standards provided a baseline of data against which the district’s progress can be measured during
each review.
8 Fiscal Crisis and Management Assistance Team
Standard No. of No. of Standards Less than 4 Average Rating
Standards
in Subset
April Jan. July June Jan. July June April April Jan. July June Jan. July June April
2007 2008 2008 2009 2010 2010 2012 2013 2007 2008 2008 2009 2010 2010 2012 2013
ACCJC
Standard I-A,
Mission, and
26* 26 26 25 3 0 0 0 0 1.52 1.96 2.19 4.81 5.74 6.07 6.73 6.81
I-B, Insti-
tutional Effec-
tiveness
ACCJC
Standard II-A,
Instructional
Programs;
II-B, Student
Support 15* 14 12 11 0 0 0 0 0 1.75 2.44 2.88 5.40 5.47 6.26 6.73 7.00
Services, and
II-C, Library
and Learn-
ing Support
Services
ACCJC
Standard NR NR
40 36 28 20 6 0 0 0 1.35 2.83 3.95 5.53 7.00 7.60 8.18
III-A, Human ** **
Resources
ACCJC
Standard III-
40* 28 28 25 2 0 0 2 1 2.32 2.34 2.76 6.13 6.93 7.23 6.90 6.90
B, Physical
Resources
ACCJC Stan-
dard III-C,
Technology,
41 35 32 26 8 0 0 12 2 1.78 2.39 2.83 4.63 6.22 6.80 5.02 5.93
and III-D,
Financial
Resources
ACCJC
Standard IV-
A, Decision-
Making Roles
and Processes, 21 17 17 17 1 0 0 6 6 2.10 2.14 2.71 5.33 7.10 6.61 5.48 5.71
and IV-B,
Board and
Administrative
Organizations
* One standard eliminated because of redundancy or inapplicability to the college and/or district.
** NR = Not Reviewed
When the average rating of the subset of FCMAT standards in an operational area reaches a six,
with no individual standard rated less than a four, and the district has sustained these ratings for two
consecutive academic years, FCMAT will no longer review the area or include it in future progress
reports.
Compton Community College District 9
Overview of Five Operational Areas of Management
Assembly Bill 318 required FCMAT to conduct a comprehensive assessment of the Compton Com-
munity College District (Compton CCD) and prepare a recovery plan addressing the five operational
areas that include Academic Achievement, Personnel Management, Facilities Management, Financial
Management, and Community Relations/Governance. FCMAT aligned the legal and professional
standards used to assess these five operational areas with the four standards of the Accrediting Com-
mission for Community and Junior Colleges (ACCJC) to assist the district in its recovery. Because
the Personnel Management operational area reached an average rating of six with no individual standard
below a four and the district had sustained these ratings for two consecutive academic years during the
prior review period, this area was not reviewed by FCMAT nor included in this seventh progress report.
Each of the identified subset of standards is presented in greater detail in later sections of this report.
This section, however, provides an overall summary of the Compton CCD’s management of each
operational area.
Academic Achievement
Overview
The role of the review team is to assess and analyze the extent to which the Compton Center’s in-
structional operations have conformed to 25 priority FCMAT Academic Achievement standards.
These standards have been associated with similar ACCJC accreditation standards relating to Institu-
tional Mission and Effectiveness (ACCJC Standard I) and Student Learning Programs and Services
(ACCJC Standard II) to assist the district with recovery and seeking accreditation. However, the
ACCJC accreditation process is separate and distinct from the legislatively mandated requirements of
AB 318 and assessment by FCMAT.
Although responding to the FCMAT standards provides the basis of a review of El Camino Com-
munity College District Compton Community Educational Center (Compton Center) activities, it
does not yield an accreditation self-study. The ACCJC has many standards not covered by the current
review. Furthermore, the requirement for documentation to support activities (e.g., the assessment
of student learning outcomes (SLOs) and their use in improvement of instruction, the relationship
between plans and budget, etc.) is very stringent. And while the activities undertaken as part of the
FCMAT review will be useful in eventually preparing a self-study, additional effort and attention to
sustainability will be required on the part of Compton Center staff.
The Academic Achievement review team examined Compton Center documents and interviewed
members of the administration, the faculty, students, and other key personnel. The center made con-
siderable improvement between the review team’s visits in July 2010 and April of 2012. A number
of documents were developed or in the process of being developed, and attention was given to items
included in the previous progress report. The key to this improvement was the organizational structure
for academic programs and student services, which has provided the center much-needed consistency
with the structure of the El Camino CCD Torrance campus.
During this review period, the center completed key documents and began their implementation. The
Educational Master Plan, the Comprehensive Master Plan, and the revised Technology Plan are all
examples of a significant planning effort that resulted in actual documents to help guide the center.
10 Fiscal Crisis and Management Assistance Team
The Compton Center continues to make progress in some additional areas that have been discussed
but not fully developed. For example, in previous visits the review team was concerned about the
lack of direction of the Institutional Effectiveness Committee. The committee is now in place and
meeting regularly. Its focus is the oversight of program review. The Planning and Budget Committee
meets regularly, and the center is now keenly aware of the relationship between the individual plan
builders, program review, unit plans, and the budget.
Status of Academic Achievement at El Camino College Compton Center
The El Camino College Compton Center has continued to make progress toward meeting the
FCMAT Academic Achievement standards since the team visit in April 2012. At its last visit, the
review team noted a number of improvements in planning, curriculum management and assessment,
professional development and progress toward meeting ACCJC standards. In this visit, the review
team noted that progress continues to be made in these areas.
The collaborative working relationship between the administrative leadership and the faculty con-
tinues to allow planning efforts to move forward. The team found a spirit of dedication among the
employees in the academic and student service areas. Employees are proud of the progress they are
making toward meeting FCMAT, and ultimately ACCJC, standards.
Planning Processes
Since the last review team visit, progress has been made in developing and implementing both long-
and short-term plans. The team noted the following:
• The comprehensive Technology Plan has been revised again and is in use.
• The Enrollment Management Plan is in place and is being funded and used. The plan
continues to place emphasis on retention and student success.
• The Comprehensive Master Plan 2012-17 has been completed and is being used.
• The Educational Master Plan has been completed and is being used.
• A successful learning community that began in fall 2009 is continuing to grow and has
gone from one cohort to four, with a fifth planned for the next academic year.
• The Student Success Plan was adopted in December 2012 and includes a variety of strate-
gies for matriculation, basic skills courses, academic support resources and services,
institutionalization, and expansion of learning communities.
• Outreach programs to both the community and local high schools are working.
• Academic programs are engaged in the program review process, and the cycle has been
shortened.
• Unit plans are improved and contain more thoughtful analyses of the programs.
• The center continues to make progress on student learning outcomes (SLOs) and assess-
ment including program learning outcomes (PLOs).
Compton Community College District 11
The unit plans examined by the team continue to show improvement in both quality and consistency.
The retirement of one of the three academic deans and the departure of the associate dean led to a
reorganization of the center and reassignment of duties. The vacant dean position will be filled; how-
ever, the associate dean position will not be filled. The new structure should be evaluated to ensure
the continued oversight of SLOs, PLOs, and assessment.
Curriculum
The curriculum offered at the Compton Center is managed and approved by the Curriculum Com-
mittee at El Camino College. While two Compton faculty members sit as voting members of the
committee, the ultimate decision about curriculum including the course outlines and the informa-
tion contained therein is not made solely at the Compton Center. For purposes of the academic and
student service programs, the center is under the management of the El Camino Community College
District.
The Curriculum Committee at El Camino College includes SLOs on the course outline of record.
The catalog directs students to a website that includes all PLOs, an ACCJC requirement. Staff have
encountered some technical issues with the CurricUNET system, but it continues to provide some
degree of systemizing course outlines. The Curriculum Committee was to have both SLOs and as-
sessments on all courses and course revisions going through the curriculum process by fall 2012.
During this visit, the review team found that by the end of spring 2013, 99% of all courses will have
at least one SLO. However, most of the courses have only one SLO, and the ACCJC requires that all
courses have more than one. Approximately 90% of the courses have assessments and 60% of the
programs have assessments.
The committee finalized the core competencies prior to the team’s July 2010 visit. The six core com-
petencies, which are the institutional learning outcomes, have been identified with dates by which
they will be reviewed. By the April 2012 visit, four of them had been assessed. The fifth, Informa-
tional Technology Literacy, is to be completed in spring 2013, and the sixth, Content Knowledge, is
to be completed in fall 2013.
Faculty at the Compton Center include SLOs and the techniques for assessing them on most of the
syllabi that students receive for individual courses. The student services programs have developed
SLOs and these are part of the Student Success Plan that was adopted in December 2012.
To fully comply with FCMAT standards and to meet the ACCJC Standard II-A 1c, which establishes
the expectation that “the institution identifies student learning outcomes for courses, programs, cer-
tificates, and degrees; assesses student achievement of those outcomes; and uses assessment results
to make improvements,” the administration and faculty of Compton Center need to continue to col-
laborate with El Camino College personnel to complete the design of SLOs for courses and programs
and assessment tools to measure program and course effectiveness for student learning. SLOs must
be assessed and the results used to improve instruction. Documentation must be available to demon-
strate the completion of these activities.
Instructional Strategies
Each Compton Center faculty member was expected to create an individual development plan based
on what was learned in a review process conducted by outside faculty members. The plans were to
be developed as part of the faculty evaluation process. The team found that the development of these
12 Fiscal Crisis and Management Assistance Team
plans has shifted focus and not much progress has been made on the individual plans. The center’s
planning agenda, resulting in several significant planning documents and committees (e.g., Educa-
tional Master Plan, Comprehensive Master Plan, Technology Plan, Institutional Effectiveness Com-
mittee, and Planning and Budget Committee), has taken much of the center’s attention during this re-
view period. Individual faculty members are attending conferences on student learning and teaching.
Compton Center faculty also join the El Camino College Torrance campus faculty in staff develop-
ment activities. More attention to staff development activities is planned for the next academic year.
There continue to be concerns regarding English as a Second Language (ESL) courses. Enrollments
are low in non-credit and credit ESL classes, and students completing non-credit classes did not
regularly move into the credit ESL program. A focus on scheduling fewer sections at better times
and working with a counselor to encourage students who need the non-credit courses to take them
is occurring. The plan is to move students quickly through the non-credit courses and into the credit
courses.
Assessment and Accountability
The ACCJC standards require the center to demonstrate its effectiveness and support student learn-
ing by developing SLOs at the course, program, and degree level. The standards further specify:
“This demonstration of effectiveness requires that learning outcomes be measured and assessed to
determine how well learning is occurring so that changes to improve learning and teaching can be
made.” There have been improvements in this area with the continued work of the Curriculum Com-
mittee in identifying SLOs and their method of assessment. As noted above, Compton Center faculty
continues to develop syllabi that include SLOs and their assessment, and work on core competencies
has progressed. As previously indicated, the center needs to complete more than one SLO for each
course and the related assessment.
All program learning outcomes must also be completed and assessment criteria adopted for them. In
addition, when the center completes the institutional learning outcomes, it will need to provide as-
sessment measures for them. A plan for sustainability for all assessments needs to be developed and
implemented.
Learning and Support Services
The inability to occupy the new Learning Resource Center (LRC) building and utilize its resources
continues to hamper the delivery of learning support services. The new projected date for occupy-
ing the resource center is spring 2014. Many of the items on the punch list for the building have been
completed and weekly meetings with appropriate staff help ensure that progress continues to be
made on completion of the LRC.
The center has hired additional academic staff in the library, which allows for broader and more
comprehensive services to be offered to students.
During prior review periods, there was concern that a number of the support labs were under-utilized
by students. Documents and interviews indicate that many more students are now availing them-
selves of these services. Many of the labs are full during much of the day.
Compton Community College District 13
Facilities Management
Overview
The FCMAT team reviewed and assessed 40 Facilities Management standards and prepared a compre-
hensive assessment based on the findings. These standards have been associated with similar ACCJC
accreditation standards relating to Physical Resources (ACCJC Standard III-B) to assist the district
with recovery and regaining accreditation. However, the ACCJC accreditation process is separate and
distinct from the legislatively mandated requirements of AB 318 and assessment by FCMAT.
At the time of the review, the manager of facilities, maintenance and operations had left the dis-
trict, and the key position of director of facilities planning and operations was filled with an interim
employee. This position has overall responsibility for facilities, maintenance, custodial, and grounds.
The interim director served previously as a senior project manager for a construction management
firm and worked with the district in that capacity for several years.
Compton Community College was originally constructed in the early 1950s and opened for classes
in fall 1953. Since that time more facilities have been added to the campus, but the utility infrastruc-
ture has not been upgraded. Compton CCD completed a Facilities Master Plan in 2009 and updated
it in July 2012. The plan includes a summary of findings and recommendations for mechanical and
electrical requirements, technology and fire and safety issues, and other critical areas that will help to
address the campus infrastructure and utility requirements.
The district was successful in seeking state and local funds for capital improvements with the pas-
sage of Measure CC in November 2002, which authorized the issuance of $100 million in general ob-
ligation bonds. This bond measure authorized funds to repair and renovate instructional classrooms
and job training facilities, and upgrade safety/security systems, electrical capacity, computer technol-
ogy, energy efficiency, and roofing systems.
Compton CCD has created and maintains a facilities project priority list and continues to prog-
ress with a list of projects meeting these criteria. This list is revisited annually and is to be updated
monthly through communication and prioritization between the CEO, CBO, interim director of
facilities planning and operations and other key members of cabinet.
The Phase I Utility Infrastructure project has commenced with construction. This project includes
the installation of a new 10-inch fire line, new sanitary sewer, natural gas and electrical main lines
and the redesign of the sidewalk and interior courtyard. The Phase II Utility Infrastructure project
has also commenced with construction. Installation of the asphalt at lot F was almost complete in
April 2013, and demolition of the asphalt in lots D and E was ongoing during this review.
The district continues to contract with construction management consultants to assist with projects.
Outstanding litigation on the LRC project has been resolved, except for the lawsuit involving Chevron
Energy Solutions. The CEO anticipates that the LRC will be ready for occupancy by spring 2014. The
Server Room and Management Information Systems (MIS) Building project has been completed.
The general campus appearance and common areas have been disrupted due to the implementation
of the Phase I and II Utility Infrastructure projects. Walkways were free of obstructions and tripping
hazards and many areas have been fenced off due to construction. Weeds are still apparent around
the campus, the maintenance yard area is in need of organization, and thorough cleaning is needed
throughout the campus.
14 Fiscal Crisis and Management Assistance Team
Safety measures including campus security and employee safety have not improved. The key con-
trol policies and procedures cover the return of keys but do not include control of stock supplies
and distribution, thereby limiting the knowledge of key issuance and control. In addition, key stan-
dardization has not yet been adopted. Most of the campus lighting issues have been addressed with
temporary lighting until they can be replaced with permanent fixtures. No evidence was provided
supporting appropriate chemical inventory and handling and training of personnel. While campus
police maintain emergency response procedures, FCMAT found no efforts to maintain inventory and
only directives to maintain Material Safety Data Sheets (MSDS). In addition, an external audit found
outdated chemicals and improper storage of flammable items.
The district’s Injury and Illness Prevention Program (IIPP) was recently updated and includes plans
for scheduled and unscheduled safety inspections. Records were provided to confirm only one site
inspection walk had occurred during this review period. Further, no documentation was provided to
support that deficiencies identified in the inspection were addressed. Safe work practices for boiler
and fired-pressure vessels could not be confirmed.
Maintenance staff completed First Aid CPR AED, ladder safety, and MSDS training. While a safety
training schedule was developed to also include electrical safety, blood borne pathogens, heat stress,
Cal/OSHA inspections, confined space, forklift use, eye safety and IIPP, the schedule was not main-
tained with fidelity and not all employees attended the training that was provided.
Financial Management
Overview
The FCMAT team reviewed and assessed 41 Financial Management standards and prepared a com-
prehensive assessment based on the findings. These standards have been associated with similar
ACCJC accreditation standards relating to Technology and Financial Resources (ACCJC Standard
III-C and III-D) to assist the district with recovery and regaining accreditation. However, the ACCJC
accreditation process is separate and distinct from the legislatively mandated requirements of AB 318
and assessment by FCMAT.
Interviews with administrative, management and classified staff as well as observations and review
of supporting documentation show that the district has regained the momentum in progress in several
financial standards that had been lost during the previous review period. During this review period,
the district advanced by one point or more on 22 of the 41 standards reviewed, and 13 of those 22 ad-
vanced more than one point. The ability to not only sustain progress, but achieve rating advancement
in more than 50% of the standards assessed, is likely the result of increased stability in key district
leadership positions, including the CEO and CBO.
The administration has worked hard to establish and communicate the lines of authority and proper
chain of command throughout the organization. Leadership works to ensure matters move appro-
priately through those channels for resolution without making staff feel they are not listened to. The
district has regained some momentum in establishing structure in the business office and has demon-
strated improved stability in the leadership of the Business Services Department. The CBO has been
in the position for approximately one year and has been focused on working directly with staff mem-
bers, evaluating accounting functions, improving processes for performing tasks, and implementing
written operational policies and procedures. Under the CBO’s leadership, the department has demon-
strated progress in establishing routine practices in several areas of operation.
Compton Community College District 15
The CBO’s active engagement with staff and administration has gained him respect from employees,
management, and others both internal and external to the organization. Feedback obtained during
interviews strongly favored the CBO’s leadership and efforts to develop the skill level of staff.
Internal Control Climate
Due to economic pressures, the district continues to operate without a dedicated internal audit posi-
tion and has abandoned its efforts to establish one at this time. As a means of demonstrating progress
in the establishment of proper internal controls for key operating areas including the business office,
bursar’s office, financial aid, and categorical state and federal grants, FCMAT has routinely recom-
mended that Compton CCD re-establish the internal audit program and hire an internal auditor dedi-
cated exclusively to the Compton campus. Although the district has decided not to staff an internal
audit position at this time, the CEO continues to demonstrate that it remains a priority to establish an
environment and culture that clearly communicates that fraud and other illegal acts will not be toler-
ated and that all allegations will be investigated.
District administrators indicated that the current Business Services Department administrative team
has the experience and skill set to eliminate the need for a separate internal audit position because
two of the department administrators have experience as former independent auditors in commu-
nity college districts. The district has developed an internal audit plan designed to identify existing
internal control weaknesses and monitor and update processes and procedures where necessary to
establish a strong control structure.
The plan identifies the CBO as the position responsible for reviewing, revising, implementing and
enforcing all aspects of the plan. Because this position is the primary party responsible for the imple-
mentation and oversight of all business activities and ensuring that district assets are properly safe-
guarded, the elements of objectivity and neutrality are lost. Neutrality requires the reviewing party to
be free from bias. Objectivity is impaired because the CBO is directly responsible for ensuring that
adequate systems are in place, reviewed and monitored regularly as part of his roles and responsibili-
ties as the CBO. In essence this plan has the CBO checking his own work and does not protect the
organization from the risk created by the CBO’s actions or omissions. To be effective, the internal
audit function must be neutral and objective. Objectivity is strengthened when the position respon-
sible for internal audit activities is removed from the performance of those activities and reports
directly to the highest level of authority. Therefore, the internal auditor should report to the CEO or
the board/special trustee.
Under the existing plan, the establishment of an audit committee could help to offset the loss of
objectivity and neutrality created as a result of the lack of review by a third party. Audit committees,
typically composed primarily of board members and top administration, monitor the control struc-
ture and act as liaison between management and the internal auditor. Since the district plan essential-
ly has the CBO acting as the internal auditor, the district should establish an audit committee, re-
sponsible directly to the board/special trustee, to maximize the effectiveness of the control structure.
Budget Process and Communications
Communication efforts throughout the organization continue as a priority focus. District staff report-
ed they generally feel informed about what is occurring in the district and in the Business Services
Department. The CEO has continued and expanded communication efforts, routinely preparing his
newsletter titled Message from Interim CEO. Staff throughout the organization acknowledged that
the CEO has an open door policy and has established weekly open door hours. Interviews with staff
16 Fiscal Crisis and Management Assistance Team
indicated that they are knowledgeable of the communications made available to them and are com-
fortable taking advantage of the CEO’s open door policy if they have issues they wish to discuss. The
review team was present during one open door time frame and noted that several individuals came to
meet with the CEO.
The district follows a budget development process based on a calendar of events and deadlines lead-
ing up to the budget adoption. The CBO is responsible for overseeing the budget development pro-
cess and its resulting budget. The instability in the CBO position during previous budget cycles has
stopped, and the current CBO has been with the district for approximately one year. The CBO de-
veloped the 2013-14 budget without outside assistance that was necessary in the prior review period.
The district continues to use the Plan Builder software to assist deans and individual departments in
developing their budgets. The unit/department plans incorporate the mission, overarching outcomes,
and other significant criteria as a tool to support the rationale behind requests for district resources.
However, department staff continue to exhibit a lack of understanding of how their funding alloca-
tions are determined.
The team reviewed numerous documents including memorandums, board meeting agendas and
minutes, presentations, financial updates to the board, and Planning and Budget Committee meet-
ing minutes. The Planning and Budget Committee continued to meet regularly throughout the year
and was provided information regarding the budget assumptions and projections for the 2012-13 final
budget and 2013-14 preliminary budget.
Board minutes reflect that budget presentations are conducted and that quarterly and annual financial
status reports were provided during board meetings throughout the fiscal year. The district presen-
tations are most commonly oral, with no identifiable written materials included in board agenda
packets. Although board agendas reflect that communications addressing budget and financial status
are taking place, there appears to be little board discussion and interaction outside of specific expen-
diture budget inquiries.
Strong leadership in the business office continues to be key for further progress in the district’s
recovery process. Continued stability in this area will be essential to further strengthen operational
procedures and to make sustainable progress in all areas managed by the Business Services Depart-
ment.
Facilities Infrastructure and Technology
Although the district has made great strides in establishing a strong leadership team in the business
office, this stability has not extended to the management of maintenance and operations. Over the
last several review periods the manager responsible for directing and overseeing facilities, mainte-
nance and operations activities has changed with each review period. During this review period a
new interim director of facilities planning and operations had recently been hired, and the district’s
utility and technology infrastructure projects were in construction. These projects have presented
the Maintenance and Operations Department with some challenges in maintaining the campus and
securing the department’s equipment because the department has been displaced from its facilities
during this phase of modernization. Staff reported that materials have been relocated and tractors,
mowers and carts have been parked wherever construction is not taking place, typically in unsecured
areas that are vulnerable to theft. The identification of secured locations for supplies, tools and equip-
ment during the displacement period is essential to ensuring that these district assets are properly
safeguarded from theft and should be a district priority.
Compton Community College District 17
The Maintenance and Operations Department does not have an adequate inventory system for
tracking small tools and equipment. This has been an ongoing department challenge. Small tool and
equipment inventories should be developed and be sufficiently detailed to account for items pur-
chased by the department and should be updated as items are lost, damaged or otherwise disposed of.
Physical inventories should take place at least annually, and the documented inventory lists should be
updated accordingly and dated.
The district has addressed many of the weaknesses in its technology infrastructure. Over the last
several years the district has worked to stabilize the network, which was crippled by outdated equip-
ment and poor connectivity. During FCMAT’s last review, the district was operating in a state of
emergency regarding technology and was experiencing serious challenges with failing cabling and
network infrastructure. Construction of the new dedicated network server room located in the Man-
agement Information Systems (MIS) Department is substantially complete; the district has replaced
core MIS equipment, including servers and network components; and has migrated to the new sys-
tem. Redundant cooling systems and generator power backup have also been installed, ensuring the
district’s ability to avoid disruptions in service and properly protect the equipment. Access controls
to the server room have been installed, preventing unauthorized access to the servers. The depart-
ment manages a parallel system with routine backups of network data, which is performed weekly
and held at an offsite storage facility, further enhancing the protection and integrity of the district’s
data. The district is in the process of upgrading the fiber connectivity, which is a core foundational
component of technology infrastructure.
Community Relations and Governance
Overview
The role of the review team is to assess and analyze the extent to which the Compton Community
College District operations have conformed to 28 priority FCMAT Community Relations/Gover-
nance standards. These standards have been associated with similar ACCJC accreditation standards
relating to Institutional Mission and Effectiveness (ACCJC Standard I) and Governance (ACCJC
Standard IV) to assist the district with recovery and regaining accreditation. However, the ACCJC
accreditation process is separate and distinct from the legislatively mandated requirements of AB 318
and assessment by FCMAT.
Although responding to the FCMAT standards provides the basis of a review of district activities, it
does not yield an accreditation self-study. The ACCJC has many standards not covered by the cur-
rent review. Furthermore, the requirement for documentation to support the description of activities
is very different. While the activities undertaken as part of the FCMAT review will be useful to the
institution, the ACCJC accreditation process is separate and distinct from FCMAT’s process.
During the visit, the governance review team examined documents and interviewed the special
trustee, administrators, staff, faculty, members of the Board of Trustees of the Compton CCD, and
community members. In addition, the team attended a meeting of the Special Trustee’s Advisory
Committee and a meeting of the Board of Trustees of the Compton CCD.
The last Compton CCD trustee election took place in November 2009, with the seating of the full
board in December 2009. Pursuant to AB 318, the elected board is not authorized to perform the
functions of a community college board and serves in an advisory capacity to the state appointed
special trustee. While the opinions of the members are solicited by the special trustee, the board does
18 Fiscal Crisis and Management Assistance Team
not have an official vote nor does it participate in closed session meetings. Thus, compliance with
many of the standards must be based on the limited role of the elected board.
Although the FCMAT standards do not explicitly address the unique nature of the Compton CCD
and the Agreement Between the El Camino CCD and the Compton CCD, dated July 1, 2008, it is
necessary to comment on this feature of the partnership. The board must understand and demon-
strate public support for the agreement that describes the relationship between the Compton Center,
Compton CCD and El Camino CCD. In addition, it must completely understand and support the re-
covery plan and be able to articulate it to the public. The board members must develop a cooperative
working relationship with each other and with the special trustee and administrative staff to achieve
improvement in the governance component.
Communications
External communication for the Compton Center is formally handled through the El Camino CCD
director of community relations. Communications are handled in a variety of ways that include the
district website and a bimonthly newsletter to the Compton CCD community. The CEO continues to
be committed to communicating information about the district, the campus facilities, the budget and
the progress of initiatives. District information is provided to the board regularly. The Consultative
Council also provides a forum for the exchange and discussion of information; however, the district
should continue to find ways to ensure that council members share the information received with
their constituent groups. The review team did not find a formal plan for either external or internal
communication.
Board agendas and minutes are posted in the administration building for both campus and public in-
formation. The 2012-13 board agendas and most of the minutes were posted to the district’s website.
The district should continue to ensure that all relevant information is posted to the website regularly
and timely.
Community Relations
The information about complaint procedures for students is included in the catalog and the schedule
of classes. Complaints received by the board are referred to the CEO for resolution. The Board of
Trustees is aware of its role regarding informal public concerns. It is important, however, that the
board members do not speak or appear to be speaking for the entire board unless authorized to do so.
Community Collaboratives and District Committees
The outreach strategy for the Compton Center has been formalized in the Enrollment Management
Plan and implementation is well under way. The district has supported the implementation by pro-
viding staffing and funding for the plan’s activities. The Enrollment Management Plan now has an
increased emphasis on retention of students. The CEO has continued to make a priority of developing
relationships in the community.
Within the district, the Consultative Council and its committees provide the opportunity for individ-
uals to provide advice and counsel. The district needs to continue its examination of committees and
their functions and should ensure that constituency members of the Consultative Council and com-
mittees report information to their respective groups so that staff and students are informed.
Compton Community College District 19
Policy
A system for developing board policies and administrative regulations is in place and continues to be
used effectively. The system includes an opportunity for the district’s various constituencies to have
input before the policy is presented to the board/special trustee. Board meeting agendas include pro-
posed board policies and administrative regulations associated with the policies as part of the agen-
da. The policies and regulations have gone through the consultative process on campus before being
placed on the board agenda. Board policies and administrative regulations and procedures should be
developed, reviewed and approved on a regularly scheduled timeline so they remain current and meet
legal requirements.
Board Roles/Boardsmanship
As noted above, the Compton CCD has a full board serving in an advisory capacity as of the No-
vember 2009 election. The board has engaged in numerous training sessions that have addressed the
areas of expectations, roles and responsibilities for members and provide a framework for operations
at board meetings. The team found general agreement about the importance of board training. This
training should enable the board to assume its full role when the college/district again becomes an
independent entity. The board should continue its commitment to training and should work to fully
understand the appropriate role and conduct of a board member at meetings and when dealing with
the public and staff.
The board is informed on issues of importance. Staff members regularly provide reports, the CEO
and special trustee meet with board members to review operational issues, and the CEO provides
background information and data in advance of public meetings.
The board must learn to work as a unified whole. The members must show respect for one another
and support the decisions of the majority. The board needs to continue work to develop a coherent,
unified voice. Board members need to improve their working relationships with the special trustee
and administration and consistently treat them with respect.
Board Meetings
Agendas and minutes of board meetings are posted in the Administration Building. In addition, this
material is available on the district’s website. Members of the public have an opportunity to address
both agenda and non-agenda items during board meetings. Since the appointment of the current
special trustee in fall 2011, the elected board does not sit at the dais during all board meetings nor do
the members attend closed session meetings. The board is engaged by the special trustee through the
process of asking their opinion on items but does not have voting authority. While interviews indi-
cated that the board is working hard to understand the issues and work together rather than as five
individuals, board members need to learn to deal with controversial and complex issues in a coopera-
tive manner.
The review team attended the April 16, 2013 Board of Trustees meeting. While board members at
this meeting did not demonstrate the same level of unbefitting behavior that was exhibited during the
meeting attended by the team during the prior review period, interviews and review of the 2012-13
board meeting minutes revealed several instances of board members exhibiting behavior that was
inappropriate for a public session. Although agenda items can at times be extremely sensitive matters
to board members, their conduct at meetings should remain professional.
20 Fiscal Crisis and Management Assistance Team
The Board of Trustees currently has no rights, duties or powers and thus members may at times feel
frustrated by the board’s advisory role and the fact that they do not sit at the dais for all meetings.
However, it is critical that the members exhibit the decorum and professionalism that would demon-
strate their readiness to assume a full role when the district regains local authority to govern areas of
operations.
Compton Community College District 21
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard I: Institutional Mission and Effectiveness
The institution demonstrates strong commitment to a mission that emphasizes achievement of student
learning and to communicating the mission internally and externally. The institution uses analyses
of quantitative and qualitative data and analysis in an ongoing and systematic cycle of evaluation,
integrated planning, implementation, and re-evaluation to verify and improve the effectiveness by
which the mission is accomplished.
A. Mission -- The institution has a statement of mission that defines the institution’s broad
educational purposes, its intended student population, and its commitment to achieving
student learning.
1. The institution establishes student learning programs and services aligned with its purposes,
its character, and its student population.
2. The mission statement is approved by the governing board and published.
3. Using the institution’s governance and decision-making processes, the institution reviews its
mission statement on a regular basis and revises it as necessary.
4. The institution’s mission is central to institutional planning and decision making.
Use of FCMAT Professional and Legal Standards
Since 1998 the Fiscal Crisis and Management Assistance Team (FCMAT) has been involved in
assisting California K-12 school districts under state administration to return to local governance.
FCMAT developed a standards-based assessment tool as part of this work, and has adapted it for
use in assessing and monitoring the Compton Community College District. FCMAT professional
and legal standards are being used in conjunction with the Accrediting Commission for Community
and Junior Colleges (ACCJC) standards, as Compton Community College District seeks not only to
return to local governance but also seeks to re-establish its academic accreditation.
For ACCJC Standard I – Institutional Mission and Effectiveness, appropriate FCMAT standards
from the operational areas of Community Relations/Governance and Academic Achievement have
been used to measure progress on ACCJC Standards I-A and I-B. The Accrediting Commission
for Community and Junior Colleges will conduct its own accreditation review to determine when
accreditation will be restored to the Compton Community College District. It is hoped that by
addressing the recommendations made in this report to implement the FCMAT professional and
legal standards, the Compton Community College District will be assisted in readying itself for the
ACCJC accreditation review in the future.
Each professional and legal standard has been provided a score, on a scale of 0 to 10, as to the dis-
trict’s implementation of the standard at this particular point in time. These ratings provide a basis
for measuring the district’s progress over the course of time.
ACCJC Standard I 1
2 ACCJC Standard I
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard I: Institutional
Rating Rating Rating Rating Rating Rating Rating Rating
Mission and Effectiveness
A. Mission
Standard to be Addressed
Policy - Community Relations and Governance Standards
Policies are well written, organized and
4.1 readily available to all members of the staff 2
and to the public.
Board bylaws, policies and administrative
4.6 regulations are supported and followed by 2 2 2 3 6 6 7 7
the board and district staff.
Planning Process - Academic Achievement Standards
A common vision of what all students
1.1 should know and be able to do exists and 2 3 3 5 5 7 7 6
is put into practice.
The administrative structure of the college
1.2 1
promotes student achievement.
The college has long-term goals and
1.3 performance standards to support the 0 1 2 4 4 5 7 7
improvement of student achievement.
Curriculum - Academic Achievement Standards
The college has clear and valid objectives
2.3 to promote student learning and a 4 4 4 6 6 7 7 7
process for curriculum development.
Instructional Strategies - Academic Achievement Standards
The college provides equal access to
educational opportunities to all students
3.1 1
regardless of race, gender, socioeconomic
standing, and other factors. [EC 51007]
Challenging learning goals and student
learning outcomes and individual
3.2 1 2 2 5 5 6 7 7
educational plans and programs for all
students are evident.
The college faculty and staff promote
3.5 and communicate high expectations for 1 1 1 6 6 7 7 7
the learning and behavior of students.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard I 3
4 ACCJC Standard I
ACCJC Standard I-A: Mission
FCMAT Community Relations/Governance Standard 4.6 – Policy
Professional Standard:
Board bylaws, policies and administrative regulations are supported and followed by the board and
district staff.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the special trustee
3. Interviews with Board of Trustees members
4. Board meeting agendas and minutes, May 2012 through April 2013
5. Board policies and administration regulations
Progress on Implementing the Recommendations of the Recovery Plan:
1. There are no board bylaws. Board policies and administrative regulations are developed by
the appropriate district administrators and, through the CEO and the special trustee, taken to
the Consultative Council for review and discussion. The faculty leadership confirmed that
the policies and administrative regulations are carefully reviewed by the constituency groups
prior to the council meeting and then discussed at the council. The district should continue to
evaluate the process for forwarding reviewed policies and regulations to the board to ensure
that it allows for appropriate feedback from the campus constituency groups.
2. Once the board/special trustee has adopted the policies and administrative regulations, they
are posted on the website and reflected in the board minutes. The district should ensure ap-
proved policies are posted timely so that both the external community and the campus com-
munity have access to them.
3. During its fieldwork, the review team found no evidence indicating that approved board poli-
cies are not followed.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard I 5
ACCJC Standard I-A: Mission
FCMAT Academic Achievement Standard 1.1 - Planning Process – Vision
Professional Standard:
A common vision of what all students should know and be able to do exists and is put into practice.
Sources and Documentation:
1. Interviews with faculty, vice president of Compton Center, associate dean of academic
affairs, three division chairs and two academic deans
2. Interviews with Student Learning Outcome (SLO) coordinators
3. Comprehensive Master Plan, 2012-17
4. El Camino College Catalog 2012-13, Compton Center Edition
5. El Camino College Educational Master Plan, 2010-15
6. Selected spring 2013, Compton Center course syllabi
7. Selected student service program reviews (Compton Center)
8. Recently completed academic program reviews (Compton Center)
9. Selected course outlines of record (academic area)
10. Program review schedule for all academic and student service programs
Progress on Implementing the Recommendations of the Recovery Plan:
1. The review team selected random examples of course outlines of record to examine. These
came from a variety of disciplines. The team also reviewed 44 course syllabi from a variety
of disciplines and found that all of the boilerplate material, such as the mission and vision
statement, policies on student attendance, grading, and discrimination were included. During
this review period, the course objectives were more complete. The center should ensure that
all course outlines are consistent in the quality of information provided to students.
2. A review of student learning outcomes (SLOs) and assessment criteria found that all of the
courses reviewed contained at least one SLO; however, not all of them contained assessment
criteria. The ACCJC requires that all courses have more than one SLO and have assessment
criteria used to determine if students meet them. Per the ACCJC, these were to be completed
by fall 2012. While the Compton Center is making significant progress in this area, the time-
line was not met. The center must use the curriculum of El Camino College, thus the SLOs
and assessment criteria must be approved through the El Camino CCD Curriculum Commit-
tee, which includes Compton Center faculty. The center, working with El Camino College,
needs to have more than one SLO and the appropriate assessment criteria in place and on its
course outlines and syllabi as soon as possible.
3. Discussions with the two academic deans (career technical and health and human services), the
associate dean of academic affairs and the SLO coordinators indicated that the process of commu-
nicating the need for SLOs is clear. Once the SLOs and assessment criteria are determined, they
are placed on CurricUNET, an online curriculum development and automated workflow system
where the faculty and academic administrators have access to them. During this review period, the
use of CurricUNET caused some problems because faculty found that it was not as user friendly
as it first seemed; therefore, the center is considering a different system, such as TrackDat.
6 ACCJC Standard I
4. At the last review, the team recommended that the program learning outcomes (PLOs) be in-
cluded in the center catalog, which is required by ACCJC. A review of the catalog found that
it includes a link where students can check the PLOs for all programs.
5. During prior review periods, FCMAT focused on the annual plans in academic affairs (which
were completed in March 2010), career and technical education (also completed in March
2010) and health and human services (completed in June 2010). During this review period,
the team reviewed the annual plans completed since April 2012. The team examined the an-
nual program plans in the Transfer/Career Center and found them to be comprehensive, with
accurate data on transfer rates. The team also reviewed the annual plans in math and natural
sciences, health and human services, career and technical education, and institutional re-
search. The plans included the program goal(s); evaluation of goal(s); objective; the impact
of the objective on other programs, units and areas; resources needed; and supporting ratio-
nale. The center has made some progress in this area.
6. El Camino CCD shortened the program review cycle from six years to four years. The Comp-
ton Center has adopted the same timeline. Since some disciplines have one or two courses
and really cannot be considered a program, these courses have been combined as a cluster
(for example, sociology might include ethnic studies and women’s studies). This will ensure
that all courses are placed in a review cycle. The center is continuing to review the concept of
clustering programs for program review. Although the center has adopted a template for pro-
gram review, not all programs follow the adopted format, and discussions with the vice presi-
dent indicated that some adjunct faculty use more individualized formats. The center should
ensure that all programs are consistent and follow the adopted program review template.
7. The team’s examination of the program review schedule for all academic and student service
programs at the Compton Center found that the center follows the adopted schedule. The
program review forms contain the data necessary for faculty to complete comprehensive re-
views, including full-time equivalent students (FTES) by program, retention and completion
data. They also include SLOs for each course and an analysis of the data as it relates to as-
sessment, where assessment criteria are provided. In some, specific recommendations for im-
provement are provided along with costs. A new 14-page program review document includes
a discussion of why a program review should be conducted; what the process is; recommen-
dations; the status of the previous recommendations; and other questions that would help in
the evaluation of programs and areas. Much of the document is geared to non-academic pro-
grams, such as accounting and fiscal, but it contains some key questions that would benefit
the academic programs as well.
The team examined program reviews in biological science, education and early childhood ed-
ucation, history, political science, machine tool technology, music, English, fire and emergen-
cy technology, social science, administration of justice, and automotive. The center should
continue to follow the cycle of and template for program reviews that has been adopted for
all academic and student service programs.
ACCJC Standard I 7
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 6
Implementation Scale:
8 ACCJC Standard I
ACCJC Standard I-A: Mission
FCMAT Academic Achievement Standard 1.3 - Planning Process - Goals and
Performance Standards
Professional Standard:
The college has long-term goals and performance standards to support the improvement of student
achievement.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with the academic dean overseeing technology and the coordinator of the library
3. Interviews with two academic deans
4. Interviews with the vice president of student services and the vice president of academic
affairs at El Camino College, Torrance campus
5. Interviews with SLO coordinators and the associate dean overseeing SLOs
6. Minutes and/or reports of planning groups at the Compton Center (Technology, Library,
Curriculum, Planning and Budget, and Institutional Effectiveness committees)
7. Documents that support long-range planning to improve student achievement at the Compton
Center, since April 2012
8. Comprehensive Master Plan, 2012-17
9. El Camino College Educational Master Plan, 2010-15
10. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton Center, over the past two years, has developed several critical planning docu-
ments that are used at the center for planning and budgeting: the Comprehensive Master Plan
(2012-17), the Educational Master Plan, the Enrollment Management Plan, the unit plans, the
annual plans, and the program reviews. In addition, the Plan Builder software system is used
by departments for planning, and it also ties the budget to planning objectives.
While educational master plans typically include projections for more than eight years, the
center is planning for accreditation status by then. If that occurs, the center will need to have
a master plan that takes into consideration its new status and goals that are part of a fully ac-
credited institution, rather than a center. The current Educational Master Plan and the Com-
prehensive Master Plan provide a reasonable road map for the center in its planning efforts
and focus it on manageable tasks to support and lead student learning and student success. It
is apparent that with these more comprehensive plans in place, functioning committees like
Planning and Budget, Institutional Effectiveness, and Technology have a guide for their re-
spective plans.
2. The Enrollment Management Plan for the Compton Center contains goals for student success
and improving retention. It outlines marketing strategies and methods of advertising (direct
mail, publications, etc.). The document generally assigns the tasks, timelines for completion
and individuals responsible for implementation. The Compton Center should continue to im-
ACCJC Standard I 9
plement the objectives outlined in the Enrollment Management Plan, and use the plan (as it
is revised annually) to guide the center in outreach, retention and completion and continually
evaluate the elements of the plan for effectiveness.
3. The team reviewed several annual program plans in both the academic and student service
areas and found them to be improved compared to the plans reviewed on previous visits. The
plans included goals and the review of data, such as course completions. The associate dean,
who was hired from the El Camino CCD Torrance campus, is very involved in the above-
mentioned tasks.
The retirement of one of the three academic deans led to a study of the administrative struc-
ture at the center and triggered a reorganization. At the time of FCMAT’s visit, the center had
two academic deans and an associate dean. However, the associate dean will be leaving the
district, and the position will not be filled. Instead the center has reassigned duties and plans
to fill the vacant academic dean position. The new structure should be evaluated following
implementation.
There continues to be a significant amount of support in institutional planning that, although
it is coordinated at the El Camino CCD Torrance campus, includes participation from staff,
faculty and administration at the Compton Center. Staff appreciate the continued collabora-
tive leadership provided by the vice president of the center, which has helped to move the
center forward in a variety of ways.
4. Prior review periods included recommendations to continue working with industry partners
to provide short-term career certificates for students to enhance local career opportunities.
During this visit, the dean of the Career Technical Division indicated there is interest in pro-
grams such as solar technology, pharmacy technicians, and water treatment. There also is
interest in National Automotive Technicians Education Foundation (NATEF) certification for
the auto tech program. While industry partners often express interest in programs that would
benefit their needs, colleges need to work to encourage maximum enrollments in existing
career technical programs prior to adding new ones. The careful planning cycle in which the
center is now engaged should be helpful when considering new programs because the cycle
is data driven and has built-in assessments.
10 ACCJC Standard I
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard I 11
ACCJC Standard I-A: Mission
FCMAT Academic Achievement Standard 2.3—Curriculum—Management and
Quality
Professional Standard:
The college has clear and valid objectives to promote student learning, and a process for curriculum
development.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with two Compton Center Curriculum Committee members
3. Interviews with academic deans and department chairs
4. Compton Center course syllabi, fall 2012 and spring 2013
5. El Camino College Compton Center Course Schedule, summer 2012, fall 2012, winter/spring
2013
6. El Camino College Curriculum Handbook
7. Compton Center Curriculum Committee minutes, fall 2012 to April 2013
8. El Camino Curriculum Review Timeline, spring 2013
9. Selected program reviews
Progress on Implementing the Recommendations of the Recovery Plan:
1. During the visit last year, interviews with the academic deans indicated that more than 90%
of all courses had both SLOs and assessment criteria, and 58% of the courses had been as-
sessed. Interviews further indicated that 100% of the courses would have SLOs and assess-
ment criteria by fall 2012. The SLOs and assessment criteria are housed in CurricUNET.
While the center (since all curriculum goes through the Curriculum Committee) has made
impressive strides in completing SLOs for all courses, most courses have only one. In addi-
tion, the assessments are occurring but they are not 100% complete. The center has encoun-
tered problems with CurricUNET and there is discussion about changing to another system.
Interviews indicated that the Curriculum Committee is beginning discussions on multiple
SLOs the week of April 22. The center should ensure that multiple SLOs and assessment cri-
teria are complete for all courses and that all courses have been assessed.
2. A strong program review document that is research based and provides thoughtful analysis of
student learning data is critical to assess student learning. This is part of the new focus of the
Institutional Effectiveness Committee. During the prior review period, the Institutional Effec-
tiveness Committee was in the process of changing its mission and function. It now focuses
on the oversight of program review. The committee is charged with ensuring that the reviews
address the appropriate issues, ensuring consistency and quality, evaluating the plans and
linkages and tying the program reviews to budget and planning. The biology program review
has been reviewed by the Institutional Effectiveness Committee; three additional program re-
views will follow.
12 ACCJC Standard I
A Planning and Budget Committee meets regularly and ensures that the budgets and planning
tie together. The process for funding items at the center includes the Plan Builder. The Plan
Builder is reviewed and updated at least twice each academic year. If items are not included
in Plan Builder, funding requests are denied. In addition, the program reviews include pro-
posed equipment and staffing requests so that budget clearly ties to program.
The program review documents reviewed by FCMAT during this visit included stronger data
identifying the relationship between learning outcomes and assessment and tying program
needs to budget. The center should develop a method to assess the effectiveness of the Insti-
tutional Effectiveness Committee’s work, including its relationship to student success.
3. The curriculum relationship between the faculty at the Compton Center and the El Camino
CCD Torrance campus continues to be collaborative, and this bodes well for the whole SLO/
assessment effort at the center. This institutional relationship is essential for the assessment
tasks that must be completed. The center should continue to support the collegial relation-
ships between the faculties on both campuses.
4. The Professional Development Committee has its own budget. The committee at the Comp-
ton Center is chaired by the director of human resources and the associate dean of academic
affairs and includes four faculty members. The professional development efforts over the past
two years at the center have been robust. Interviews indicated that while there is still interest
and attention on professional development, it is now more individualized. Previously, profes-
sional development was a significant part of the faculty evaluation process. While it is still
included, the center’s attention has been refocused on learning outcomes and assessment,
program review, unit plans, and student support.
In previous years, many of the faculty fulfilled their professional development plans through
group development activities, such as On Course. Because most of the faculty has completed
these activities, there is more interest in discipline-focused staff development, which has
been the direction during this review period.
Part of the staff development focus last year was on the recently developed Educational Mas-
ter Plan (EMP). Continued discussion about the EMP, the core competencies, assessment and
learning outcomes will be the major focus of staff development. As previously recommend-
ed, the center should continue to review and assess the staff development activities and tie
them to student learning. The future focus of the center, student learning, and student success
should be at the core of these discussions.
5. The refocusing of the Institutional Effectiveness Committee on program review, the advent of
the Educational Master Plan, the conscious correlation of program review to the budget and
the attention to SLOs, PLOs and assessment should bode well for student success and student
learning.
6. Standard 2.1 provides additional information on the curriculum process.
ACCJC Standard I 13
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
14 ACCJC Standard I
ACCJC Standard I-A: Mission
FCMAT Academic Achievement Standard 3.2 - Instructional Strategies - Student
Plans and Outcomes
Professional Standard:
Challenging learning goals and student learning outcomes (SLOs) and individual educational plans
and programs for all students are evident.
Sources and Documentation:
1. Interviews with Compton Center administrators and faculty and El Camino College
administrators
2. Course outlines of record approved by El Camino College
3. Compton Center course syllabi, fall 2012 and spring 2013
4. Program Reviews
5. El Camino College Status Report on Learning Outcomes Implementation, submitted to the
ACCJC August 20, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. Faculty members from the Compton Center and El Camino College formed a joint committee
to develop SLOs. In a report dated August 20, 2012 El Camino College reported to the ACCJC
that all courses and programs had at least one SLO. The report also indicated that assessment of
at least one SLO has been done in all courses and nearly 100% of the programs. In addition, the
report indicated that all student support services had identified at least one SLO and 84% of the
services had assessed at least one SLO. Course and program level SLO assessment has been a
high priority for the Compton Center. The center has developed an impressive graphical model
showing the linkages between the course, program and institutional learning outcomes, and
the faculty have adopted this model. Although considerable progress has been made in course
and program SLO identification and assessment, the ACCJC expects that more than one SLO
is identified and assessed in each course and program. There is ongoing discussion regarding
whether it is effective to combine programs for the purpose of review.
Accurate alignment between the body of knowledge in course objectives and the body of
knowledge described by SLOs is essential if the college is to “award credit based on student
achievement of the course’s stated learning outcomes” and the “program’s stated learning out-
comes” (ACCJC Standard II, 2h and 2i). This alignment implies that SLOs are course-bound,
meaning they are designed by course and are used by all who instruct that course to ensure that
student achievement is a measure of the course’s learning objectives. The English Consistency
Project, which outlines a common reading assignment and writing prompt for sections of Eng-
lish A, B, and C will contribute to the tight alignment of the body of knowledge and the objec-
tives in these courses. The essays will be normed using an approved rubric.
ACCJC Standard I 15
Institutional learning objectives (formerly called core competencies or degree-level learning
outcomes) have also been developed. The development is part of an assessment cycle that is
well-integrated between the El Camino CCD Torrance campus and Compton Center. There are
six core competency statements: content knowledge; critical, creative and analytical thinking;
communication and comprehension; professional and personal growth; community and collab-
oration; and information and technology literacy. Core competency assessment is coordinated
by the Assessment of Learning Committee, and assessments are conducted by randomly sur-
veying students and their professors in courses that are strongly tied to these competencies. As-
sessments have been performed for critical, creative and analytical thinking (spring 2011), com-
munication and comprehension (fall 2011), professional and personal growth (spring 2012),
community and collaboration (fall 2012), and information and technology literacy (spring
2013). Assessment of content knowledge is planned for fall 2013. Dialog about the results of
the assessment of communication and comprehension occurred during a summit held in Octo-
ber 2011. It is critical that the center engage in widespread dialog about the outcome of each of
the assessments as required by the accreditation standards of the ACCJC.
The development, assessment, and use of results of student learning outcomes have been
enhanced by the adoption of a facilitator model. Three faculty facilitators work directly with
other faculty to assist in the effort. Additionally, the center’s associate dean of academic af-
fairs has had responsibility for implementing SLOs. This associate dean will be leaving and
will not be replaced; instead, the duties of the three instructional deans have been reorga-
nized. One dean will have the title of dean of student success and will have responsibility for
student learning outcomes.
Much progress has been made in identifying, assessing and reflecting on SLOs. Multiple op-
portunities for training have been offered, and the faculty has taken advantage of them. By
2012, the ACCJC expected all community colleges to be at the proficiency level for SLOs.
This means that the results of assessments are being used for improvement, with widespread
institutional dialogue about the results. Compton Center and El Camino faculty and staff
members must continue their joint efforts to develop all learning outcomes and methods of
assessing them as required by the ACCJC. The next step is to show the use of the data for
improving instruction and student services, including some demonstration of actual changes
made in courses or programs. This should be documented in program reviews.
2. El Camino College has completed a review of all courses. The team was given a sample of
course outlines, and the dates on these outlines were all within the last year. Although they
did not entirely follow the template the institution has adopted, the outlines were substantial-
ly complete. El Camino College has decided to include SLOs as part of the course outline of
record. However, the institution decided not to include either assessment methods or rubrics
on the outlines. The Curriculum Committee considers new and substantially changed courses
during the fall semester and reviews ongoing courses during the spring semester.
The CurricUNET system should enable an easy link between outlines and the SLOs. Inter-
views indicated that this system is useful because it allows the user to see materials produced
at other community colleges. However, there have been some difficulties at the local level
when El Camino CCD Torrance campus and Compton Center faculty attempted to enter data.
This should be resolved so that all data is correctly reported.
16 ACCJC Standard I
3. An examination of course syllabi produced by Compton Center faculty showed that most of
the syllabi contained at least one SLO. Program reviews submitted for the 2011-12 academic
year for the most part contained at least one SLO, assessment data and suggestions for chang-
es to improve the results.
4. The Student Services Division at the Compton Center continues to make progress on docu-
menting SLOs. The review revealed that all programs had assessed their outcomes and were
engaged in dialog about the results.
5. Student Education Plans (SEPs) are now completed for most students and are available on-
line. A report of which students have completed their plan and which are due to be updated
is available, and all counselors use the SEP online system to develop SEPs. The center has
adopted orientation for all students. As a result, the assessment procedure is now being taken
more seriously and many students are asking for assistance in the subject matter prior to tak-
ing an assessment exam.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard I 17
ACCJC Standard I-A: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 3.5 – Instructional Strategies –
Expectations for Students
Professional Standard:
The college faculty and staff promote and communicate high expectations for the learning and be-
havior of students.
Sources and Documentation:
1. Interviews with administrators, classified staff and faculty
2. El Camino College Catalog 2012-13, Compton Center Edition
3. Compton Center course syllabi, fall 2012 and spring 2013
4. Academic Performance Profile – Compton Educational Center and Peer Institutions,
Institutional Research December 2012
5. Compton Center Student Handbook and Planner
6. Compton Center Accountability Report for the Community Colleges
7. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
Progress on Implementing the Recommendations of the Recovery Plan:
1. The expectations for student learning and behavior are communicated to students in official
publications of the Compton Center, such as the El Camino Catalog, Compton Center Edi-
tion, and the Compton Center Student Handbook and Planner. The planner includes a sec-
tion on student conduct and an excellent section on study skills emphasizing the difference
between expectations in high school and college. For example, grades are primarily based on
quality of work and not attendance and class participation.
2. The behavioral expectations for students are communicated through course syllabi. The tem-
plate for syllabi includes a section on behavior. An examination of Compton Center course syl-
labi revealed that most included sections on the instructor’s expectations for student behavior.
3. The El Camino College Catalog and Student Handbook, Compton Center, reflect high aca-
demic expectations and academic standards. Students are informed that the college is dedi-
cated to maintaining an optimal learning environment. Violations of the Standards of Student
Conduct are handled by the dean of student services with the right of appeal, if any, to El
Camino College’s vice president of student and community advancement.
4. Counselors are becoming more accustomed to using the online educational plan system
introduced by the El Camino staff. During a prior visit, some counselors reported that the
electronic SEPs are going well because they can see the last SEP completed, which is help-
ful when students come in for an updated educational plan. At the time of the review team’s
visit, there was a problem with producing a report regarding the use of SEPs. However, this
was expected to be corrected by summer 2013. The report should provide the student services
administrators at the Compton Center with useful data on the total number of students lack-
ing an updated educational plan so that counselors can provide follow-up services.
18 ACCJC Standard I
5. The fall 2007 Student Profile report for Compton Center showed that 30% of students did not
stay in their courses until the end of the semester, and only about 57% of students success-
fully passed their courses. These statistics indicate there had been little headway in improv-
ing basic skills instruction, increasing degree and certificate completion rates and raising
transfer rates at that time. This data, in part, led to the Compton Center’s decision to invite a
visiting team of basic skills experts to aid in shaping an approach to the college’s basic skills
initiative. For three months (March to May 2009) the visiting team met with administrators,
instructional faculty, non-instructional faculty, staff, researchers, committees, and program
directors. They reviewed a number of college documents, including reports and plans. The
Hope report, as the findings of the visiting team are commonly referred to on campus, pro-
vided the college with a number of short- and long-term recommendations in the areas of:
1) Campus Culture and Climate, 2) Administrative and Organizational Practices, 3) Program
Components, 4) Staff Development, 5) Instructional Practices, and 6) Research Consider-
ations as they relate to the college’s basic skills student population. The Hope report was
named after team lead Laura Hope, who has assisted a number of colleges in evaluating the
effectiveness of their basic skills initiative. This report has now been translated into the Stu-
dent Success Plan that is being implemented (see Standard II-A, 3.4 for additional details).
6. The Compton Center Accountability Report for the Community Colleges (ARCC) gives data
on student progress and achievement. The academic performance of Compton Center stu-
dents compared with that of its closest peers has not changed significantly from prior review
periods. On most measures, Compton Center student performance is below that of other col-
leges in the peer group. Two exceptions are the persistence rate and completion rates where
Compton Center performance exceeds one of the peer colleges.
7. The Enrollment Management Plan is placing more emphasis on student success and less on
growth in student population. In addition, the orientation now required of students before
they take placement tests should allow for more accurate placement of students and improved
results in the basic skills areas.
8. No poll of students concerning expectations has been conducted, and students typically are
not regularly involved in faculty evaluations. The evaluation policy included in the collective
bargaining agreement provides for student evaluations as part of the comprehensive evalu-
ation process, though it is not mandatory. There is no consistent way to solicit student feed-
back if a poll is not taken.
ACCJC Standard I 19
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
20 ACCJC Standard I
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard I: Institutional Mission and Effectiveness
The institution demonstrates strong commitment to a mission that emphasizes achievement of student
learning and to communicating the mission internally and externally. The institution uses analyses
of quantitative and qualitative data and analysis in an ongoing and systematic cycle of evaluation,
integrated planning, implementation, and re-evaluation to verify and improve the effectiveness by
which the mission is accomplished.
B. Improving Institutional Effectiveness – The institution demonstrates a conscious effort
to produce and support student learning, measures that learning, assesses how well
learning is occurring, and makes changes to improve student learning. The institution
also organizes its key processes and allocates its resources to effectively support student
learning. The institution demonstrates its effectiveness by providing 1) evidence of the
achievement of student learning outcomes and 2) evidence of institution and program
performance. The institution uses ongoing and systematic evaluation and planning to
refine its key processes and improve student learning.
1. The institution maintains an ongoing, collegial, self-reflective dialogue about the continuous
improvement of student learning and institutional processes.
2. The institution sets goals to improve its effectiveness consistent with its stated purposes. The
institution articulates its goals and states the objectives derived from them in measurable
terms so that the degree to which they are achieved can be determined and widely discussed.
The institutional members understand these goals and work collaboratively toward their
achievement.
3. The institution assesses progress toward achieving its state goals and makes decisions
regarding the improvement of institutional effectiveness in an ongoing and systematic cycle
of evaluation, integrated planning, resource allocation, implementation, and re-evaluation.
Evaluation is based on analyses of both quantitative and qualitative data.
4. The institution provides evidence that the planning process is broad-based, offers oppor-
tunities for input by appropriate constituencies, allocates necessary resources, and leads to
improvement of institutional effectiveness.
5. The institution uses documented assessment results to communicate matters of quality assur-
ance to appropriate constituencies.
6. The institution assures the effectiveness of its ongoing planning and resource allocation
processes by systematically reviewing and modifying, as appropriate, all parts of the cycle,
including institutional and other research efforts.
7. The institution assesses its evaluation mechanisms through a systematic review of their effec-
tiveness in improving instructional programs, student support services, and library and other
learning support services.
ACCJC Standard I 21
22 ACCJC Standard I
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard I: Institutional
Rating Rating Rating Rating Rating Rating Rating Rating
Mission and Effectiveness
B. Improving Institutional Effectiveness
Standard to be Addressed
Community Relations/Governance Standards – Communications
The college has developed a comprehen-
1.1 sive plan for internal and external com- 1 1 1 5 7 5 7 7
munications, including media relations.
Information is communicated to the staff
1.2 at all levels in an effective and timely 2 2 2 5 7 5 6 6
manner.
Staff input into college operations is
1.3 1 2 2 4 7 6 7 7
encouraged.
Media contacts and spokespersons who
1.4 have the authority to speak on behalf of the 2
college have been identified.
Individuals not authorized to speak on
behalf of the college refrain from making
1.5 2 2 2 6 7 6 7 7
public comments on board decisions and
college programs.
Parent and Community Relations - Community Relations/Governance Standards
The college has developed and annually
2.3 disseminates procedures on the handling of 2
complaints of unlawful discrimination.
Students’ and community members’
2.4 complaints are addressed in a fair and 2 2 2 5 6 7 7 7
timely manner.
Volunteers receive appropriate training and
2.7 play a meaningful role that contributes to 1
the educational program.
Community Collaboratives - Community Relations/Governance Standards
The board and president support
partnerships and collaborations with
3.1 2 2 3 5 8 7 8 8
community groups, local agencies, and
businesses.
ACCJC Standard I 23
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard I: Institutional
Rating Rating Rating Rating Rating Rating Rating Rating
Mission and Effectiveness
The board and the president establish
broad-based committees or councils
to advise the college on critical college
issues and operations as appropriate. The
membership of these collaboratives and
3.2 3 3 3 4 6 6 7 8
councils should reflect the full cultural,
ethnic, gender and socioeconomic
diversity of the student populations -
Shared Governance, Academic Senate,
etc.
Policy - Community Relations/Governance Standards
Policies are well written, organized and
4.1 readily available to all members of the staff 2
and to the public.
Policies and administrative regulations
4.2 are up to date and reflect current law 2 2 2 3 6 5 6 6
and local needs.
The board has adopted all policies
4.3 1 1 1 2 6 5 6 6
mandated by state and federal law.
Board bylaws, policies and
score score
administrative regulations are supported
4.6 2 2 2 3 6 6 reflected reflected
and followed by the board and district in Sect. in Sect.
I-A I-A
staff.
Planning Processes - Academic Achievement Standards
The administrative structure of the college
1.2 1
promotes student achievement.
The college has long-term goals and score score
1.3 performance standards to support the 0 1 2 4 4 5 reflected reflected
in Sect. in Sect.
improvement of student achievement. I-A I-A
The college directs its resources fairly
1.4 and consistently to accomplish its 0 1 1 not not not not not
reviewed reviewed reviewed reviewed reviewed
objectives.
Curriculum - Academic Achievement Standards
Policies regarding curriculum, course
2.2 offerings, and instruction are reviewed and 8
approved by the Governing Board.
24 ACCJC Standard I
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard I: Institutional
Rating Rating Rating Rating Rating Rating Rating Rating
Mission and Effectiveness
The college has clear and valid objectives score score
2.3 to promote student learning and a 4 4 4 6 6 7 reflected reflected
in Sect. in Sect.
process for curriculum development. I-A I-A
A process is in place to maintain
2.4 alignment among standards, practices 1 1 3 5 5 6 7 7
and assessments.
The college has adopted a plan for
2.10 integrating technology into curriculum 2 3 3 6 6 7 7 8
and instruction.
The college optimizes all funding to install
2.11 4
technology in classrooms and offices.
Instructional Strategies - Academic Achievement Standards
The college provides equal access to
educational opportunities to all students
3.1 1
regardless of race, gender, socioeconomic
standing, and other factors. [EC 51007]
Challenging learning goals and student
score score
learning outcomes (SLOs) and individual
3.2 1 2 2 5 5 6 reflected reflected
educational plans and programs for all in Sect. in Sect.
I-A I-A
students are evident.
The college faculty and staff promote score score
3.5 and communicate high expectations for 1 1 1 6 6 7 reflected reflected
in Sect. in Sect.
the learning and behavior of students. I-A I-A
Class size and faculty assignments
3.11 support effective student learning to 2 5 6 8 8 8 9 9
achieve student learning outcomes.
Faculty members use a variety of
instructional strategies and resources
3.12 that address their students’ diverse needs 1 1 2 5 5 6 7 7
and modify and adjust their instructional
plans appropriately.
Assessment and Accountability - Academic Achievement Standards
The college has developed content and
learning standards for all subject areas
4.1 3 3 3 5 6 6 7 7
that are understood and followed by
college faculty.
ACCJC Standard I 25
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard I: Institutional
Rating Rating Rating Rating Rating Rating Rating Rating
Mission and Effectiveness
Student learning outcomes are measured
and assessed through a variety of
4.2 measurement tools (e.g., tests, quizzes, 1 1 1 4 4 6 7 7
portfolios, projects, oral and written
reports).
The assessment tools are clear measures
of what is being taught and provide
4.3 information for the administration and 1 1 1 4 4 6 6 7
faculty to improve learning opportunities
for all students.
Faculty and administrators are provided
with data in a timely and accessible
4.4 format, and with training in order for 1 1 1 5 5 6 6 6
them to analyze and solve issues of
student learning outcomes.
The board and college understand the
elements of state and federal accountability
4.10 1
programs and communicate the availability
of options and special services to students.
Professional Development - Academic Achievement Standards
Professional development demonstrates a
5.1 clear understanding of purpose, written 1 2 2 5 5 6 5 5
goals, and appropriate evaluations.
Professional development provides the
faculty and staff with the knowledge and
5.2 1 2 2 6 6 6 6 6
the skills to improve instruction and the
curriculum.
Administrative support and training are
provided to all faculty members, and
5.6 new faculty members and administrators 1
are provided with training and support
opportunities.
Evaluations provide constructive
feedback for improving job performance.
5.7 Additional professional development is 1 2 2 4 5 5 5 5
provided to support employees with less
than satisfactory evaluations.
26 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 1.1 – Communication
Professional Standard:
The college has developed a comprehensive plan for internal and external communications, including
media relations.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the special trustee
3. Interview with the chair of the Special Trustee’s Advisory Committee
4. Website - Compton Center
5. District Policies and Procedures Manual
6. Newsletters
7. Materials developed by the El Camino CCD director of community relations
8. Memos sent and news articles regarding the Compton Center
Progress on Implementing the Recommendations of the Recovery Plan:
1. External communication for the Compton Center is formally handled through the director
of community relations for the El Camino CCD. News releases about the center are pro-
vided through the director of community relations office. This partnership is beneficial to the
Compton Center and should continue.
Recent examples of materials of interest to the community included: a variety of releases on
student successes, information on the Special Trustee’s Advisory Committee, a number of ar-
ticles on the CEO’s community meetings, and the routine update on Compton Center events.
2. District information is provided on the website at www.district.compton.edu. The Compton
Center should ensure that the website is current and maintained. The team noted that board
meeting minutes were posted in a timelier manner than during the last review period.
3. Communications are handled in a variety of ways, which include the website and a bi-month-
ly newsletter sent to residents in the Compton CCD. The newsletter averages approximately
10 pages and includes a message/update from both the CEO and the vice president of the
Compton Center. It contains a number of items including stories on student successes, facili-
ties projects, election results and other topics of general interest to the district community.
4. The CEO sends out a letter the Friday before each regular board meeting that is posted on the
website and a periodic letter with a focused message to the campus community. These serve
the purpose of direct communication with the special trustee, the elected board and the Spe-
cial Trustee’s Advisory Committee.
5. The CEO schedules time one day per week from 2 p.m.-4 p.m. to meet with anyone on the
campus. No appointment is necessary, and the agenda is up to the person dropping in. Typi-
cally an average of five to six individuals attend these sessions each week. Conversations
ACCJC Standard I 27
with staff and faculty indicate that the regularity of these meetings and the opportunity to
meet with the CEO is appreciated, and they feel comfortable talking with him.
6. The CEO has made a significant effort to be out in the community representing the district.
As noted during the last review period, the CEO attends service club meetings, such as Ro-
tary and Kiwanis, and reaches out to community members and leaders in all of the district’s
service areas. These outreach efforts appear to be effective and present a positive image and
message to the community about the Compton Center and the external relationships between
it and the communities it serves, and should continue.
During this review period, the CEO has hosted a series of CEO Roundtable Discussions in
the various communities served by the Compton CCD, which have been well received by the
communities. One interviewee stated that, “Dr. Curry took the center to the community.”
7. The Standing Committee document states, “All committee meeting calendars, agendas and
minutes are to be posted on the designated space on the Center’s webpage.” A review of the
website finds this requirement is followed and provides a good example of the district’s com-
mitment to widespread communication. The CEO should also continue holding meetings
with groups on campus.
8. The team did not find a formal plan for either external or internal communication. As recom-
mended during the prior review period, the Compton CCD should consider developing a for-
mal plan for internal and external communication and distribute it internally and externally.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 5
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
28 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 1.2 – Communications
Professional Standard:
Information is communicated to the staff at all levels in an effective and timely manner.
Sources and Documentation:
1. Interview with the CEO
2. Interviews with faculty leaders
3. Consultative Council agendas and minutes
4. ECC Compton Center News, April 2012 through April 2013
5. Internal campus communication documents, including newsletters
6. List of Compton Center committees
7. Attendance at Consultative Council meeting
8. Attendance at Special Trustee’s Advisory Committee meeting
9. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. As stated in Standard 1.1, newsletters provide a source of information to all campus mem-
bers. In addition, the CEO continues to hold meetings on campus to communicate informa-
tion about the district, the campus facilities, the budget and the progress of initiatives. The
CEO also coordinated a budget update during this review period that was provided at meet-
ings of the Board of Trustees, Consultative Council, and the Special Trustee’s Advisory Com-
mittee.
At both meetings of the elected board and the Special Trustee’s Advisory Committee, the
CEO has appropriate staff members provide updates on issues that are in the forefront on
campus. For example, the interim director of facilities presented a written and oral report on
the district’s building projects, and staff from the Research Office provided a PowerPoint
presentation on the Accountability Reporting for the Community Colleges (ARCC) and state-
wide comparative data on the Student Success Scorecard. District management and the CEO
should continue to conduct informational meetings on campus for communication and feed-
back and provide pertinent reports from areas of interest to the campus and the community.
2. Board agendas and minutes are posted in the administration building for both campus and
public information. The CEO’s staff is responsible for keeping board meeting information
current on the website, and interviews and the district website indicate that improvement has
been made in this area. The district should continue these efforts.
3. The Compton Center has a Consultative Council, which is composed of one management
employee, the Academic Senate president and president elect, the certificated union chapter
president, the classified union chapter president, and the Associated Student Body (ASB)
president. The vice president of the center and the CEO also serve on the council, which is
chaired by the CEO. This body serves as the shared governance group for the Compton Cen-
ter. Its purpose is to review materials provided from the various Consultative Council com-
ACCJC Standard I 29
mittees and make recommendations to the CEO. The committee members are the leadership
from each campus-wide constituent group, and committees meet weekly.
Interviews with Compton Center leadership indicated that the committees are expected to re-
port back to their constituency groups, but it is not always done. The district should continue
to find ways to ensure that constituency members of the Consultative Council report informa-
tion to their respective groups to help improve campus communication and to keep staff and
students informed.
Agenda items from the meeting FCMAT attended during fieldwork included a review of the
Board of Trustees meeting agenda, which included issues that previously had been discussed
in Consultative Council.
4. Compton CCD staff has a document listing the members of each standing committee, its
purpose and the body to which it is responsible (e.g., Consultative Council, Operational
Committees, and Committees of the Academic Senate). This is an organized approach and
provides a clear picture of the Compton Center structure both for governance and functional
purposes. This document should be updated as necessary.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 5
June 2012 Rating: 6
April 2013 Rating: 6
Implementation Scale:
30 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 1.3 – Communications
Professional Standard:
Staff input into college operations is encouraged.
Sources and Documentation:
1. Interviews with faculty leaders (Academic Senate and Union)
2. Interviews with administrators (deans, vice president, CEO)
3. Interview with the special trustee
4. Consultative Council agendas and minutes
5. Board policies and administrative procedures
6. List of Compton Center committees
7. Institutional Effectiveness Committee meeting minutes
8. Attendance at Consultative Council meeting
9. Attendance at Institutional Effectiveness Committee meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton Center has a Consultative Council and two committees, Institutional Effective-
ness and Planning and Budget, under the council. The center also has eight operational cam-
pus committees: Facilities; Health and Safety; Technology; Enrollment Management; Student
Success; Professional Development; Auxiliary Services; and Health Benefits. There are also
four Academic Senate committees. All of the committees are listed on one document that
provides information regarding the composition of members and function of each committee.
Both of the two committees directly under the Consultative Council (Institutional Effective-
ness and Planning and Budget) have, under the leadership of the CEO with assistance from
the special trustee, revised their mission and assumed more direct responsibility for program
review oversight and its correlation with budget and planning. The district should continue
the standing committee structure and ensure that the actions and deliberations of the council
and committees are published and disseminated to help guarantee widespread communica-
tion.
2. The review team attended a Consultative Council meeting on April 15, 2013, at which most
of the council members were present. The district should ensure that each member is respon-
sible for communicating appropriate information back to their constituency.
3. In separate meetings with the special trustee, CEO and vice president of the center, it was
clear that they continue to value and encourage faculty, staff and student input on matters that
affect the Compton Center.
4. Discussions with both administrators and faculty demonstrate that collaborative decisions are
supported and a variety of avenues exist for members of the campus community to provide
input on matters affecting the Compton Center.
ACCJC Standard I 31
5. As mentioned elsewhere in this report, the CEO sets aside a weekly time for members of the
campus community to meet with him informally on any matter of concern, to share ideas and
ask questions.
6. The review team met with a variety of groups and individuals during fieldwork, including
division chairs, deans, the vice president, faculty leadership, student leaders, student learning
outcomes (SLO) coordinators, and members of the Student Success and Library committees.
Meetings indicated that the leadership of the Compton Center welcomes and encourages
ideas, input and suggestions, and takes them seriously.
7. During prior reviews, there was considerable confusion about the function of the Institutional
Effectiveness Committee. Some committee members thought it was for shared governance
and final budget decisions, and others did not. The function of the committee and its member-
ship was beginning to be clarified during the last review period.
An Institutional Effectiveness Committee meeting that the team attended during this review
confirmed that the center has a well-functioning committee responsible for judging the com-
pleteness and viability of all academic program reviews. Because program reviews directly
tie to the Educational Master Plan, Facilities Master Plan, Staffing Plan and Technology
Master Plan, a working knowledge of these plans is necessary for this committee. Interviews
with committee members support the minutes from Institutional Effectiveness Committee
meetings stating that, although the process is still fairly new, the committee is now working
as it should. The district should regularly evaluate the Institutional Effectiveness Committee
structure to ensure it provides necessary information to the Consultative Council. The district
should, after evaluation of the committee, be able to attest to its sustainability and be able to
adjust it as needed to serve the planning efforts of the Compton Center.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
32 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 1.5 – Communications
Professional Standard:
Individuals not authorized to speak on behalf of the college refrain from making public comments on
board decisions and college programs.
Sources and Documentation:
1. Interview with the special trustee
2. Interview with the CEO
3. Interview with Board of Trustees member
4. Interviews with senior administrators
5. Interview with the superintendent/president of El Camino CCD
6. Newspaper articles regarding the Compton CCD
Progress on Implementing the Recommendations of the Recovery Plan:
1. Discussions with various individuals indicated that most district employees understand that
the CEO speaks on behalf of the Compton CCD and the director of community relations at El
Camino CCD speaks on behalf of the Compton Center to the media about programs, items of
community interest and other information normally assigned to the public information office
of a campus. Members of the board should be routinely reminded by the CEO and special
trustee that when they speak about district matters, caution should be used because some in-
dividuals may perceive that the individual is speaking for the entire board.
2. The director of community relations at El Camino CCD is at the Compton Center every week
and works well with the CEO.
3. Although not reportedly a significant problem during this review period, the issue of speak-
ing on behalf of the district when not authorized to do so has been a significant problem in
the Compton CCD in the past. The district should consider adopting a policy that addresses
the process for communicating to the media or public about board decisions and college pro-
grams.
ACCJC Standard I 33
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
34 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 2.4 – Community Relations
Professional Standard:
Students’ and community members’ complaints are addressed in a fair and timely manner.
Sources and Documentation:
1. Interviews with faculty, staff, and administration
2. Interviews with Board of Trustees members
3. Board policies
4. El Camino College Compton Center Schedule of Classes
5. El Camino College Catalog
6. Board meeting minutes, 2012-13
7. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The information about complaint procedures for students is included in the catalog. The cata-
log cites El Camino CCD Board Policy 5310 on student grievances, which includes steps for
resolution. Some information also is included in the schedule of classes. This documentation
includes clear information about how students are to proceed with grievances and the com-
plaint process. As the district continues its comprehensive policy review and update process,
it should ensure that written policies and forms are also in place.
2. An examination of board minutes did not reveal any instances of complaints being presented
to the board. Interviews indicated that occasionally board members receive complaints and
such complaints are referred to the CEO for resolution. The district should continue its cur-
rent practice of handling complaints. In addition, it should ensure that forms for student com-
plaints are available.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard I 35
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 3.1 – Community
Collaboratives and District Committees
Professional Standard:
The board and president support partnerships and collaborations with community groups, local agen-
cies and businesses.
Sources and Documentation:
1. Interviews with Board of Trustees members
2. Interviews with faculty, staff, and administration
3. Council and Committee Structure – Compton CCD
4. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
5. Attendance at Special Trustee’s Advisory Committee meeting
6. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The outreach strategy for the Compton Center has been formalized in the Enrollment Man-
agement Plan, and implementation is under way. The district has supported the implementa-
tion by providing funding and staffing for the activities in the plan. The Enrollment Man-
agement Committee is a committee of the Consultative Council, and develops marketing,
recruitment and retention plans. The enrollment management and marketing plans include
specific outreach strategies to engage local school districts and charter schools and provide
information to middle and high school students within the district’s boundaries. In general,
the goals are specific and include measurable results and the costs associated with them. Al-
though the Enrollment Management Plan continues to have a focus on outreach and recruit-
ment, it has been updated to include a strong emphasis on student retention.
2. The CEO continues to make a priority of developing relationships with local businesses, and
continues to build partnerships with community and civic organizations. The CEO makes a
practice of informing the community of Compton Center activities and goals through meet-
ings with church groups and local councils.
The district should continue its outreach to community groups and the formation of partner-
ships that will serve the district and its students. Board members also should participate in
community outreach with each of their constituencies.
36 ACCJC Standard I
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 8
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard I 37
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 3.2 – Community
Collaboratives and District Committees
Professional Standard:
The board and the president establish broad-based committees or councils to advise the college on
critical college issues and operations as appropriate. The membership of these collaboratives and
councils should reflect the full cultural, ethnic, gender and socioeconomic diversity of the student
populations: Shared Governance, Academic Senate, etc.
Sources and Documentation:
1. Interviews with faculty, staff, and administration
2. Board policies
3. Council and Committee Structure – Compton CCD
4. Special Trustee’s Advisory Committee agendas and minutes
5. Advisory committees’ meeting minutes
6. Attendance at Special Trustee’s Advisory Committee meeting
7. Attendance at Consultative Council meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee adopted Board Policy 2410 (10/20/09), Board Policies, Administra-
tive Regulations and Procedures, which states that employees and students shall have the op-
portunity to participate in the development of board policies and administrative regulations
through a consultative process. The board/special trustee also adopted Board Policy 2510
(7/20/10), Participation in Local Decision Making. This policy states that, although the board is
the ultimate decision maker, it is committed to ensuring that appropriate members of the district
participate in developing policies and regulations. Additionally, the policy states that the board
will not take any action on matters subject to this policy until the appropriate constituent groups
have been provided the opportunity to participate. Although these policies have been adopted,
they are not fully operational because at present the special trustee is the decision maker.
2. The Consultative Council and its subcommittees are responsible for providing input for deci-
sion-making. During the previous review period, the membership of the Consultative Council
had been reduced to eight: three faculty members, one student, one classified employee, one
manager, the vice president for academic affairs and the CEO who serves as chair. The new
form of the Council has been successful. The members receive reports on and consider such
items as the construction projects, the development of the new memorandum of understand-
ing (MOU) with the El Camino CCD, and the reorganization of Academic Affairs.
3. During the last review period, the Institutional Effectiveness Committee, a committee of the
Consultative Council, was reactivated. Its charge is to focus on the program review to ascertain
that the questions raised are being addressed and to ensure the consistency of documents. The
committee reviews the documents and recommends revisions using a feedback template. The
committee is also responsible for monitoring the recommendations made by FCMAT. The dis-
trict should continue to review the effectiveness of the Institutional Effectiveness Committee.
38 ACCJC Standard I
4. Advisory committees are required for all technical programs. If properly constituted, they can
provide valuable advice for program changes and development. FCMAT reviewed minutes
from four of the advisory committees. Topics such as job opportunities in the field, industry
expectations, preparation of students, and suggestions made by industry representatives were
discussed. The district should continue the use of advisory committees.
5. During the last review period, the special trustee established the Special Trustee’s Advisory
Committee. The committee consists of 10 members. The role of the committee is to provide
advice to the special trustee regarding policy matters that affect the district and its operations;
promote community awareness of the district’s efforts, focus on quality instruction, educa-
tional mission, fiscal stability, and ultimately accreditation; and foster community support for
the district and the Compton Center.
The review team attended the April 15, 2013 Special Trustee’s Advisory Committee meeting
and observed that the members in attendance were informed, engaged, and took their role as
advisors seriously. The committee exhibited a model of excellent board conduct. The agenda
included such items as the 2013-14 budget assumptions, the goals of the committee for 2013,
the expenditures against the line of credit, and the agreement between El Camino CCD and
Compton CCD. Interviews indicated that members of the committee will be participating in
training activities, including ethics, accreditation, and the Brown Act.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard I 39
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 4.2 – Policy
Professional Standard:
Policies and administrative regulations are up to date and reflect current law and local needs.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the special trustee
3. Board policies and administrative regulations
4. Board meeting agendas and minutes, May 2012 through April 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. A system for developing board policies and administrative regulations is in place and being
used effectively. A review of the board policies and administrative regulations supports that
the Compton CCD has been working on implementing and updating them. Discussions with
the special trustee confirmed that the template provided to districts by the Community Col-
lege League of California (CCLC) was used.
A review of the board policies revealed that they cite the appropriate Education Code, the
Elections Code (if applicable) and the Western Association of Schools and Colleges (WASC)
standards. The appropriate administrative regulations do not immediately follow the board
policy on the district’s website or in its numbering system, but they do reference the applica-
ble board policy. FCMAT continues to recommend that a cycle be established to ensure that
policies are regularly reviewed.
2. Board meeting agendas include proposed board policies and administrative regulations. The
policies and regulations go through the consultative process on campus before being placed
on the board agenda. The board policies and administrative rules and regulations follow the
numbering and format adopted by CCLC and provided to districts in 2008. Board policies
and administrative regulations and procedures should be developed, reviewed and approved
on a regularly scheduled timeline so they remain current and meet legal requirements.
3. Once approved, policies and regulations are posted on the district’s website (www.district.
compton.edu) so the public and the campus community may view them.
40 ACCJC Standard I
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 5
June 2012 Rating: 6
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard I 41
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 4.3 – Policy
Professional Standard:
The board has adopted all policies mandated by state and federal law.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the special trustee
3. Board policies
Progress on Implementing the Recommendations of the Recovery Plan:
1. A review of the Board Policy Manual, which contains the approved board policies, shows
that the district continues to make progress in adopting required board policies. The district
should continue to review and adopt policies as suggested by CCLC.
2. Some administrative regulations associated with the board policies also have been adopted,
but the district should ensure that all policies needing a regulation and/or procedure are also
developed and adopted.
3. Under the guidance of the special trustee, board policies are presented at a board meeting for
discussion and adoption after the Consultative Council has reviewed them and ensured they
follow the appropriate format developed by CCLC and meet legal standards. The district
should develop and adhere to a process and a schedule to ensure that policies and procedures
are reviewed timely and disseminated to the campus community.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 2
January 2010 Rating: 6
July 2010 Rating: 5
June 2012 Rating: 6
April 2013 Rating: 6
Implementation Scale:
42 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Community Relations/Governance Standard 4.6 – Policy
Professional Standard:
Board bylaws, policies and administrative regulations are supported and followed by the board and
district staff.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the special trustee
3. Interviews with Board of Trustees members
4. Board meeting agendas and minutes, May 2012 through April 2013
5. Board policies and administrative regulations
Progress on Implementing the Recommendations of the Recovery Plan:
1. There are no board bylaws. Board policies and administrative regulations are developed by
the appropriate district administrators and, through the CEO and the special trustee, taken to
the Consultative Council for review and discussion. The faculty leadership confirmed that
the policies and administrative regulations are carefully reviewed by the constituency groups
prior to the council meeting and then discussed at the council. The district should continue to
evaluate the process for forwarding reviewed policies and regulations to the board to ensure
that it allows for appropriate feedback from the campus constituency groups.
2. Once the board/special trustee has adopted the policies and administrative regulations, they
are posted on the website and reflected in the board minutes. The district should ensure ap-
proved policies are posted timely so that both the external community and the campus com-
munity have access to them.
3. During its fieldwork, the review team found no evidence indicating that approved board poli-
cies are not followed.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard I 43
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 1.3 - Planning Process - Goals and
Performance Standards
Professional Standard:
The college has long-term goals and performance standards to support the improvement of student
achievement.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with the academic dean overseeing technology and the coordinator of the library
3. Interviews with two academic deans
4. Interviews with the vice president of student services and the vice president of academic
affairs at El Camino College, Torrance campus
5. Interviews with SLO coordinators and the associate dean overseeing SLOs
6. Minutes and/or reports of planning groups at the Compton Center (Technology, Library,
Curriculum, Planning and Budget, and Institutional Effectiveness committees)
7. Documents that support long-range planning to improve student achievement at the Compton
Center, since April 2012
8. Comprehensive Master Plan, 2012-17
9. El Camino College Educational Master Plan, 2010-15
10. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton Center, over the past two years, has developed several critical planning docu-
ments that are used at the center for planning and budgeting: the Comprehensive Master Plan
(2012-17), the Educational Master Plan, the Enrollment Management Plan, the unit plans, the
annual plans, and the program reviews. In addition, the Plan Builder software system is used
by departments for planning, and it also ties the budget to planning objectives.
While educational master plans typically include projections for more than eight years, the cen-
ter is planning for accreditation status by then. If that occurs, the center will need to have a mas-
ter plan that takes into consideration its new status and goals that are part of a fully accredited
institution, rather than a center. The current Educational Master Plan and the Comprehensive
Master Plan provide a reasonable road map for the center in its planning efforts and focus it on
manageable tasks to support and lead student learning and student success. It is apparent that
with these more comprehensive plans in place, functioning committees like Planning and Bud-
get, Institutional Effectiveness, and Technology have a guide for their respective plans.
2. The Enrollment Management Plan for the Compton Center contains goals for student success
and improving retention. It outlines marketing strategies and methods of advertising (direct
mail, publications, etc.). The document generally assigns the tasks, timelines for completion
and individuals responsible for implementation. The Compton Center should continue to im-
plement the objectives outlined in the Enrollment Management Plan, and use the plan (as it
44 ACCJC Standard I
is revised annually) to guide the center in outreach, retention and completion and continually
evaluate the elements of the plan for effectiveness.
3. The team reviewed several annual program plans in both the academic and student service
areas and found them to be improved compared to the plans reviewed on previous visits. The
plans included goals and the review of data, such as course completions. The associate dean,
who was hired from the El Camino CCD Torrance campus, is very involved in the above-
mentioned tasks.
The retirement of one of the three academic deans led to a study of the administrative structure
at the center and triggered a reorganization. At the time of FCMAT’s visit, the center had two ac-
ademic deans and an associate dean. However, the associate dean will be leaving the district, and
the position will not be filled. Instead the center has reassigned duties and plans to fill the vacant
academic dean position. The new structure should be evaluated following implementation.
There continues to be a significant amount of support in institutional planning that, although
it is coordinated at the El Camino CCD Torrance campus, includes participation from staff,
faculty and administration at the Compton Center. Staff appreciate the continued collabora-
tive leadership provided by the vice president of the center, which has helped to move the
center forward in a variety of ways.
4. Prior review periods included recommendations to continue working with industry partners
to provide short-term career certificates for students to enhance local career opportunities.
During this visit, the dean of the Career Technical Division indicated there is interest in pro-
grams such as solar technology, pharmacy technicians, and water treatment. There also is
interest in National Automotive Technicians Education Foundation (NATEF) certification for
the auto tech program. While industry partners often express interest in programs that would
benefit their needs, colleges need to work to encourage maximum enrollments in existing
career technical programs prior to adding new ones. The careful planning cycle in which the
center is now engaged should be helpful when considering new programs because the cycle
is data driven and has built-in assessments.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard I 45
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 2.3—Curriculum—Management and
Quality
Professional Standard:
The college has clear and valid objectives to promote student learning, and a process for curriculum
development.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with two Compton Center Curriculum Committee members
3. Interviews with academic deans and department chairs
4. Compton Center course syllabi, fall 2012 and spring 2013
5. El Camino College Compton Center Course Schedule, summer 2012, fall 2012, winter/spring
2013
6. El Camino College Curriculum Handbook
7. Compton Center Curriculum Committee minutes, fall 2012 to April 2013
8. El Camino Curriculum Review Timeline, spring 2013
9. Selected program reviews
Progress on Implementing the Recommendations of the Recovery Plan:
1. During the visit last year, interviews with the academic deans indicated that more than 90%
of all courses had both SLOs and assessment criteria, and 58% of the courses had been as-
sessed. Interviews further indicated that 100% of the courses would have SLOs and assess-
ment criteria by fall 2012. The SLOs and assessment criteria are housed in CurricUNET.
While the center (since all curriculum goes through the Curriculum Committee) has made
impressive strides in completing SLOs for all courses, most courses have only one. In addi-
tion, the assessments are occurring but they are not 100% complete. The center has encoun-
tered problems with CurricUNET and there is discussion about changing to another system.
Interviews indicated that the Curriculum Committee is beginning discussions on multiple
SLOs the week of April 22. The center should ensure that multiple SLOs and assessment cri-
teria are complete for all courses and that all courses have been assessed.
2. A strong program review document that is research based and provides thoughtful analysis of
student learning data is critical to assess student learning. This is part of the new focus of the
Institutional Effectiveness Committee. During the prior review period, the Institutional Effec-
tiveness Committee was in the process of changing its mission and function. It now focuses
on the oversight of program review. The committee is charged with ensuring that the reviews
address the appropriate issues, ensuring consistency and quality, evaluating the plans and
linkages and tying the program reviews to budget and planning. The biology program review
has been reviewed by the Institutional Effectiveness Committee; three additional program re-
views will follow.
46 ACCJC Standard I
A Planning and Budget Committee meets regularly and ensures that the budgets and planning
tie together. The process for funding items at the center includes the Plan Builder. The Plan
Builder is reviewed and updated at least twice each academic year. If items are not included
in Plan Builder, funding requests are denied. In addition, the program reviews include pro-
posed equipment and staffing requests so that budget clearly ties to program.
The program review documents reviewed by FCMAT during this visit included stronger data
identifying the relationship between learning outcomes and assessment and tying program
needs to budget. The center should develop a method to assess the effectiveness of the Insti-
tutional Effectiveness Committee’s work, including its relationship to student success.
3. The curriculum relationship between the faculty at the Compton Center and the El Camino
CCD Torrance campus continues to be collaborative, and this bodes well for the whole SLO/
assessment effort at the center. This institutional relationship is essential for the assessment
tasks that must be completed. The center should continue to support the collegial relation-
ships between the faculties on both campuses.
4. The Professional Development Committee has its own budget. The committee at the Comp-
ton Center is chaired by the director of human resources and the associate dean of academic
affairs and includes four faculty members. The professional development efforts over the past
two years at the center have been robust. Interviews indicated that while there is still interest
and attention on professional development, it is now more individualized. Previously, profes-
sional development was a significant part of the faculty evaluation process. While it is still
included, the center’s attention has been refocused on learning outcomes and assessment,
program review, unit plans, and student support.
In previous years, many of the faculty fulfilled their professional development plans through
group development activities, such as On Course. Because most of the faculty has completed
these activities, there is more interest in discipline-focused staff development, which has
been the direction during this review period.
Part of the staff development focus last year was on the recently developed Educational Mas-
ter Plan (EMP). Continued discussion about the EMP, the core competencies, assessment and
learning outcomes will be the major focus of staff development. As previously recommend-
ed, the center should continue to review and assess the staff development activities and tie
them to student learning. The future focus of the center, student learning, and student success
should be at the core of these discussions.
5. The refocusing of the Institutional Effectiveness Committee on program review, the advent of
the Educational Master Plan, the conscious correlation of program review to the budget and
the attention to SLOs, PLOs and assessment should bode well for student success and student
learning.
6. Standard 2.1 provides additional information on the curriculum process.
ACCJC Standard I 47
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
48 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 2.4 - Curriculum Alignment
Professional Standard:
A process is in place to maintain alignment among standards, practices and assessments.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with two Compton Center Curriculum Committee members
3. Interviews with two academic deans
4. Interviews with the associate dean of academic affairs and the SLO coordinators
5. Compton Center course syllabi, fall 2012 and spring 2013
6. El Camino College Curriculum Handbook
7. Curriculum Committee minutes
8. Planning and Budget Committee agendas and minutes
Progress on Implementing the Recommendations of the Recovery Plan:
1. Approximately 99% of courses have SLOs and many have assessment criteria. The SLOs and
assessment criteria are listed on CurricUNET. The center should continue to work with the El
Camino CCD Curriculum Committee to develop multiple SLOs and assessment criteria for
all courses and ensure that all courses have been assessed.
2. The faculty SLO facilitators have been working individually and collectively with faculty to
develop SLOs and assessment criteria. The hiring of an associate dean has provided direct
management assistance with this effort. The person in this position will be leaving and there
are no plans to replace the position. It will be incumbent upon the deans, working with the
faculty, to complete this project so that all courses have the required learning outcomes and
assessment criteria in place. The Curriculum Committee will assume the responsibility for all
new courses going through the approval process to have the required outcomes and assess-
ments in the course outline of record. The center should continue to ensure that this occurs.
3. The course syllabi reviewed by FCMAT during this visit continue to be more complete and
standardized. The team reviewed the courses for learning outcomes and assessment as well
as for the required information for students. The inclusion of information such as attendance
policies, ethics policies, classroom decorum, grading and other course information in the
standard format makes it easier and clearer for students to understand what is expected of
them in each class. This information was included in the random sample of courses that were
reviewed. The center should continue to ensure that all course syllabi include all of the re-
quired information to facilitate student understanding of the course and center requirements
necessary to help them become successful.
4. The Planning and Budget Committee takes an active role in ensuring consistency in the re-
lationship between planning and budget allocation. The committee comprised of seven to
nine campus members meets regularly to ensure that the unit plans, program review, and
plan builders all include the items requested in department budgets. It is essential for budget
ACCJC Standard I 49
requests to have a basis in planning and evaluation, and this process should be refined and
adhered to. The key planning documents throughout the center are on a clear timeline; for
example, program reviews are on a four year cycle and plan builders are reviewed twice an-
nually. Since fall 2011, all courses and program level SLOs are assessed every four years, in
alignment with the Program Review cycle. This is vital for consistency and implementation
of plans.
5. The alignment for assessment is occurring in some departments at the center. The depth of
discussion varies among disciplines. For example, at their June 15, 2013 meeting the English
departments at the Compton Center and the El Camino CCD Torrance campus were to be
norming the assessment for the research paper required for English 1A, and the Nursing De-
partment meets once or twice a month to discuss assessment issues, which is documented in
the meeting minutes.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
50 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 2.10 - Curriculum - Integrating
Technology
Professional Standard:
The college has adopted a plan for integrating technology into curriculum and instruction.
Sources and Documentation:
1. Interviews with the librarian and deans
2. Interview with the vice president of Compton Center
3. Interview with the dean of career technical education (chair of the Technology Committee)
4. El Camino College Educational Master Plan, 2010-15
5. El Camino College Compton Center Technology Plan, 2011-16
6. Comprehensive Master Plan, 2012-17
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton Center previously completed an updated Technology Plan that reflects advanc-
es since the prior plan and provides planning direction through 2016. The plan includes all
aspects of technology at the Compton Center and continues to focus on instructional technol-
ogy directly in the classroom and to support the administration of technology (such as Cur-
ricUNET). Parts of this plan document have been updated and included in the two more com-
prehensive planning documents, the Educational Master Plan and the Comprehensive Master
Plan, 2012-17. Both of these plans are very detailed and provide guidelines for including
technology in the instructional program in a variety of ways. Interviews indicated that the
Technology Plan will be updated to cover fiscal years 2014-19. Although not part of the for-
malized professional development program, the center should continue to provide training for
faculty on integrating technology in their classes and assess the effectiveness of the technol-
ogy for student learning.
2. Because the center has an Educational Master Plan, the Technology Plan is easily tied to its
objectives. Continued attention to updating the Technology Plan is essential as technology
changes. Interviews indicated that the Technology Plan will be updated in 2014 to cover the
period through 2019. The center should continue to tie the Technology Plan to the Education-
al Master Plan to help ensure direct linkages for student learning and success.
3. The dean of career and technical programs oversees academic technology and continues
to involve the campus community in evaluating technology needs. The dean oversees the
12-member Technology Committee that includes managers, a classified staff member and
faculty members. The breadth of the committee allows for robust discussion and planning.
The committee meets monthly and has focused on the district’s management information
system (MIS) project. Phase 1 of the project, which included server room and MIS building
enhancements and an upgraded phone system, was completed in November 2012, except for
camera installation. The remaining project phases are dependent on future budget allocations.
The technology plan budget for 2013-14 is $199,000.
ACCJC Standard I 51
4. During some of the previous review periods, there were concerns regarding the lack of stu-
dent use of the technology labs. Interviews indicate that student use increased considerably
during the prior review period and has continued to increase during this review period. Inter-
views further indicated that students are taking advantage of the labs for individual work and
for group work and that students are taking greater advantage of the support services avail-
able to them. Two of the center’s labs have wireless capability and are packed with students
when open. In addition, instructional aides encourage students to use all the applications
available to them and they are heeding the advice. The center has reached out to faculty who
in turn are encouraging students to use the lab resources. Logs are now kept by the instruc-
tional aides showing numbers of students using the labs and what they are using them for.
This should provide the center a clearer sense of where to put the resources dedicated to tech-
nology to improve student learning and student success. As part of its student retention plan,
the center should continue to actively encourage students to use campus labs and support ser-
vices.
5. The Compton Center is aware of the value of technology to support student learning, and
staff now have a good sense of the planning needed for technology. Given the extensive
campus remodeling that is occurring, the center hopes to be able to replace some of the older
classrooms with new ones that have greater technological capabilities.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
52 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 3.2 - Instructional Strategies - Student
Plans and Outcomes
Professional Standard:
Challenging learning goals and student learning outcomes (SLOs) and individual educational plans
and programs for all students are evident.
Sources and Documentation:
1. Interviews with Compton Center administrators and faculty and El Camino College
administrators
2. Course outlines of record approved by El Camino College
3. Compton Center course syllabi, fall 2012 and spring 2013
4. Program Reviews
5. El Camino College Status Report on Learning Outcomes Implementation, submitted to the
ACCJC August 20, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. Faculty members from the Compton Center and El Camino College formed a joint committee
to develop SLOs. In a report dated August 20, 2012 El Camino College reported to the ACCJC
that all courses and programs had at least one SLO. The report also indicated that assessment of
at least one SLO has been done in all courses and nearly 100% of the programs. In addition, the
report indicated that all student support services had identified at least one SLO and 84% of the
services had assessed at least one SLO. Course and program level SLO assessment has been a
high priority for the Compton Center. The center has developed an impressive graphical model
showing the linkages between the course, program and institutional learning outcomes, and
the faculty have adopted this model. Although considerable progress has been made in course
and program SLO identification and assessment, the ACCJC expects that more than one SLO
is identified and assessed in each course and program. There is ongoing discussion regarding
whether it is effective to combine programs for the purpose of review.
Accurate alignment between the body of knowledge in course objectives and the body of
knowledge described by SLOs is essential if the college is to “award credit based on student
achievement of the course’s stated learning outcomes” and the “program’s stated learning out-
comes” (ACCJC Standard II, 2h and 2i). This alignment implies that SLOs are course-bound,
meaning they are designed by course and are used by all who instruct that course to ensure that
student achievement is a measure of the course’s learning objectives. The English Consistency
Project, which outlines a common reading assignment and writing prompt for sections of Eng-
lish A, B, and C will contribute to the tight alignment of the body of knowledge and the objec-
tives in these courses. The essays will be normed using an approved rubric.
Institutional learning objectives (formerly called core competencies or degree-level learning
outcomes) have also been developed. The development is part of an assessment cycle that is
well-integrated between the El Camino CCD Torrance campus and Compton Center. There are
six core competency statements: content knowledge; critical, creative and analytical thinking;
communication and comprehension; professional and personal growth; community and collab-
ACCJC Standard I 53
oration; and information and technology literacy. Core competency assessment is coordinated
by the Assessment of Learning Committee, and assessments are conducted by randomly sur-
veying students and their professors in courses that are strongly tied to these competencies. As-
sessments have been performed for critical, creative and analytical thinking (spring 2011), com-
munication and comprehension (fall 2011), professional and personal growth (spring 2012),
community and collaboration (fall 2012), and information and technology literacy (spring
2013). Assessment of content knowledge is planned for fall 2013. Dialog about the results of
the assessment of communication and comprehension occurred during a summit held in Octo-
ber 2011. It is critical that the center engage in widespread dialog about the outcome of each of
the assessments as required by the accreditation standards of the ACCJC.
The development, assessment, and use of results of student learning outcomes have been
enhanced by the adoption of a facilitator model. Three faculty facilitators work directly with
other faculty to assist in the effort. Additionally, the center’s associate dean of academic af-
fairs has had responsibility for implementing SLOs. This associate dean will be leaving and
will not be replaced; instead, the duties of the three instructional deans have been reorga-
nized. One dean will have the title of dean of student success and will have responsibility for
student learning outcomes.
Much progress has been made in identifying, assessing and reflecting on SLOs. Multiple op-
portunities for training have been offered, and the faculty has taken advantage of them. By
2012, the ACCJC expected all community colleges to be at the proficiency level for SLOs.
This means that the results of assessments are being used for improvement, with widespread
institutional dialogue about the results. Compton Center and El Camino faculty and staff
members must continue their joint efforts to develop all learning outcomes and methods of
assessing them as required by the ACCJC. The next step is to show the use of the data for
improving instruction and student services, including some demonstration of actual changes
made in courses or programs. This should be documented in program reviews.
2. El Camino College has completed a review of all courses. The team was given a sample of
course outlines, and the dates on these outlines were all within the last year. Although they
did not entirely follow the template the institution has adopted, the outlines were substantial-
ly complete. El Camino College has decided to include SLOs as part of the course outline of
record. However, the institution decided not to include either assessment methods or rubrics
on the outlines. The Curriculum Committee considers new and substantially changed courses
during the fall semester and reviews ongoing courses during the spring semester.
The CurricUNET system should enable an easy link between outlines and the SLOs. Inter-
views indicated that this system is useful because it allows the user to see materials produced
at other community colleges. However, there have been some difficulties at the local level
when El Camino CCD Torrance campus and Compton Center faculty attempted to enter data.
This should be resolved so that all data is correctly reported.
54 ACCJC Standard I
3. An examination of course syllabi produced by Compton Center faculty showed that most of
the syllabi contained at least one SLO. Program reviews submitted for the 2011-12 academic
year for the most part contained at least one SLO, assessment data and suggestions for chang-
es to improve the results.
4. The Student Services Division at the Compton Center continues to make progress on docu-
menting SLOs. The review revealed that all programs had assessed their outcomes and were
engaged in dialog about the results.
5. Student Education Plans (SEPs) are now completed for most students and are available on-
line. A report of which students have completed their plan and which are due to be updated
is available, and all counselors use the SEP online system to develop SEPs. The center has
adopted orientation for all students. As a result, the assessment procedure is now being taken
more seriously and many students are asking for assistance in the subject matter prior to tak-
ing an assessment exam.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard I 55
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 3.5 – Instructional Strategies –
Expectations for Students
Professional Standard:
The college faculty and staff promote and communicate high expectations for the learning and be-
havior of students.
Sources and Documentation:
1. Interviews with administrators, classified staff and faculty
2. El Camino College Catalog 2012-13, Compton Center Edition
3. Compton Center course syllabi, fall 2012 and spring 2013
4. Academic Performance Profile – Compton Educational Center and Peer Institutions,
Institutional Research December 2012
5. Compton Center Student Handbook and Planner
6. Compton Center Accountability Report for the Community Colleges
7. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
Progress on Implementing the Recommendations of the Recovery Plan:
1. The expectations for student learning and behavior are communicated to students in official
publications of the Compton Center, such as the El Camino Catalog, Compton Center Edi-
tion, and the Compton Center Student Handbook and Planner. The planner includes a sec-
tion on student conduct and an excellent section on study skills emphasizing the difference
between expectations in high school and college. For example, grades are primarily based on
quality of work and not attendance and class participation.
2. The behavioral expectations for students are communicated through course syllabi. The tem-
plate for syllabi includes a section on behavior. An examination of Compton Center course syl-
labi revealed that most included sections on the instructor’s expectations for student behavior.
3. The El Camino College Catalog and Student Handbook, Compton Center, reflect high aca-
demic expectations and academic standards. Students are informed that the college is dedi-
cated to maintaining an optimal learning environment. Violations of the Standards of Student
Conduct are handled by the dean of student services with the right of appeal, if any, to El
Camino College’s vice president of student and community advancement.
4. Counselors are becoming more accustomed to using the online educational plan system
introduced by the El Camino staff. During a prior visit, some counselors reported that the
electronic SEPs are going well because they can see the last SEP completed, which is help-
ful when students come in for an updated educational plan. At the time of the review team’s
visit, there was a problem with producing a report regarding the use of SEPs. However, this
was expected to be corrected by summer 2013. The report should provide the student services
administrators at the Compton Center with useful data on the total number of students lack-
ing an updated educational plan so that counselors can provide follow-up services.
56 ACCJC Standard I
5. The fall 2007 Student Profile report for Compton Center showed that 30% of students did not
stay in their courses until the end of the semester, and only about 57% of students success-
fully passed their courses. These statistics indicate there had been little headway in improv-
ing basic skills instruction, increasing degree and certificate completion rates and raising
transfer rates at that time. This data, in part, led to the Compton Center’s decision to invite a
visiting team of basic skills experts to aid in shaping an approach to the college’s basic skills
initiative. For three months (March to May 2009) the visiting team met with administrators,
instructional faculty, non-instructional faculty, staff, researchers, committees, and program
directors. They reviewed a number of college documents, including reports and plans. The
Hope report, as the findings of the visiting team are commonly referred to on campus, pro-
vided the college with a number of short- and long-term recommendations in the areas of:
1) Campus Culture and Climate, 2) Administrative and Organizational Practices, 3) Program
Components, 4) Staff Development, 5) Instructional Practices, and 6) Research Consider-
ations as they relate to the college’s basic skills student population. The Hope report was
named after team lead Laura Hope, who has assisted a number of colleges in evaluating the
effectiveness of their basic skills initiative. This report has now been translated into the Stu-
dent Success Plan that is being implemented (see Standard II-A, 3.4 for additional details).
6. The Compton Center Accountability Report for the Community Colleges (ARCC) gives data
on student progress and achievement. The academic performance of Compton Center stu-
dents compared with that of its closest peers has not changed significantly from prior review
periods. On most measures, Compton Center student performance is below that of other col-
leges in the peer group. Two exceptions are the persistence rate and completion rates where
Compton Center performance exceeds one of the peer colleges.
7. The Enrollment Management Plan is placing more emphasis on student success and less on
growth in student population. In addition, the orientation now required of students before
they take placement tests should allow for more accurate placement of students and improved
results in the basic skills areas.
8. No poll of students concerning expectations has been conducted, and students typically are
not regularly involved in faculty evaluations. The evaluation policy included in the collective
bargaining agreement provides for student evaluations as part of the comprehensive evalu-
ation process, though it is not mandatory. There is no consistent way to solicit student feed-
back if a poll is not taken.
ACCJC Standard I 57
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
58 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 3.11 - Instructional Strategies - Faculty
Assignments
Professional Standard:
Class size and faculty assignments support effective student learning to achieve student learning
outcomes.
Sources and Documentation:
1. Interviews with administrators and faculty
2. El Camino College Compton Center Course Schedule, fall 2012 and spring 2013
3. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
Progress on Implementing the Recommendations of the Recovery Plan:
1. Management of the class schedule continues to be reviewed and adjusted. Administrators
indicated that the current schedule is very tight and few course sections have been cancelled.
The curriculum is broad-based and there is a reasonable balance between day and evening
classes. Weekend classes have been reduced. The center should continue to closely monitor
the class schedule to ensure that the appropriate classes are offered at the times needed for
students.
2. Compton Center has continued its increased presence in the local high schools and the com-
munity. As called for in the Enrollment Management Plan, the center has implemented com-
prehensive outreach and student recruitment activities that have contributed to its growth.
The plan includes goals for retention and quality improvement. Action steps, identification of
responsible personnel, timelines and resources needed are also included. The center should
monitor the implementation of the Enrollment Management Plan and the effectiveness of re-
lated activities.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 9
April 2013 Rating: 9
Implementation Scale:
ACCJC Standard I 59
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 3.12 – Instructional Strategies
Professional Standard:
Faculty members use a variety of instructional strategies and resources that address their students’
diverse needs and modify and adjust their instructional plans appropriately.
Sources and Documentation:
1. Interviews with faculty and administrators
2. El Camino College Compton Center Course Schedule, fall 2012 and spring 2013
3. Course outlines of record approved by El Camino College
4. Compton Center course syllabi, fall 2012 and spring 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. Each Compton Center faculty member is assigned to create an individual development plan
to be included in the portfolio submitted for the comprehensive evaluation that occurs every
three years for tenured faculty members. At the time of the current visit, the development of
plans had not progressed beyond the previous two visits. The center should continue with de-
velopment of the individual faculty development plans and show evidence that the plans are
being implemented.
The emphasis for staff development has been on training sessions for On Course, a program
for faculty that assists students to be successful in college and in life. In this program faculty
are given tools to assist students to take ownership for their own success. Most full-time fac-
ulty members have completed the training (see additional information in Standard II-A, 3.4).
The center should ensure that new faculty are also trained.
2. The review team examined course syllabi from fall 2012 and spring 2013. In only a few of
the syllabi were diverse teaching methods given. In general, neither course outlines nor syl-
labi demonstrate a commitment to using strategies to meet diverse learning styles. However,
the On Course staff development activities will provide tools for faculty to better meet stu-
dent needs. Course syllabi should, in the future, show several diverse teaching methods (e.g.
lecture, discussion groups and student presentations).
60 ACCJC Standard I
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard I 61
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 4.1 - Assessment and Accountability –
Content and Learning Standards
Professional Standard:
The college has developed content and learning standards for all subject areas that are understood
and followed by college faculty.
Sources and Documentation:
1. Interviews with administrators and faculty
2. Compton Center course syllabi, fall 2012 and spring 2013
3. El Camino College Compton Center courses outlines
4. El Camino College Compton Center Course Schedule, fall 2012 and spring 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. See Standard I-A 3.2, items 1-4.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
62 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 4.2 – Assessment and Accountability –
Measurement of Learning Outcomes
Professional Standard:
Student learning outcomes are measured and assessed through a variety of measurement tools (e.g.,
tests, quizzes, portfolios, projects, oral and written reports).
Sources and Documentation:
1. Interviews with faculty and administrators
2. Compton Center course syllabi, fall 2012 and spring 2013
3. Course outlines of record approved by El Camino College
4. Compton Center Academic Affairs program reviews
Progress on Implementing the Recommendations of the Recovery Plan:
1. As noted earlier (see Standard I-A, 3.2), course syllabi include SLOs, but fewer listed assess-
ment techniques. Nevertheless, there are indications that faculty are aware of multiple tech-
niques of assessing SLOs. Exams and surveys are the predominant means of assessment, al-
though use is also made of essays, role playing, group work, etc. All of the program reviews
submitted contained at least one SLO, and, in some cases, assessment data and suggestions
for changes to improve the results. The use of SLOs has improved during this review period.
The English Consistency Project is an example of the use of assessment tools for the im-
provement of instruction. The center should continue to develop a variety of assessment tools
and approaches to measure student progress in achieving the learning outcomes.
2. The faculty at the Compton Center, in collaboration with El Camino College personnel, need
to continue to address the intent of the ACCJC accreditation standards regarding measuring
student learning: “… demonstration of effectiveness requires that learning outcomes be mea-
sured and assessed to determine how well learning is occurring so that changes to improve
learning and teaching can be made.” The measurement of how well learning is occurring will
involve a variety of assessment tools that are aligned to course objectives and designed to
include a range of cognitive processes and means of demonstrating learning that include au-
thentic problem solving and application. Faculty need to use the data from such assessments
to improve learning and teaching and to engage in discussions of ways to deliver instruc-
tion to maximize student learning. In addition, the results of assessment should be used to
improve instruction; data from the assessments should be used to “engage in discussions of
ways to deliver instruction to maximize student learning” for all students (see ACCJC Stan-
dards, 2002). These results and the changes that come from them should be documented.
ACCJC Standard I 63
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
64 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 4.3 Assessment and Accountability –
Alignment of Assessments and Use of Data
Professional Standard:
The assessment tools are clear measures of what is being taught and provide information for the ad-
ministration and faculty to improve learning opportunities for all students.
Sources and Documentation:
1. Interviews with administrators and faculty
2. Compton Center course syllabi, fall 2012 and spring 2013
3. Course outlines of record approved by El Camino College
Progress on Implementing the Recommendations of the Recovery Plan:
1. Since assessment tools to accompany course and program level leaning outcomes are still in
the design phase (see Standard I-A, 3.2), the review team could not fully evaluate whether
such tools are clear measures of course objectives. However, the center has made substantial
progress in this area. Assessment tools are agreed upon by discipline faculty, and the center is
making progress in the assessment of institutional learning objectives.
To fully comply with this standard and to meet ACCJC Standard II-A 1c, which establishes
the expectation that “the institution identifies student learning outcomes for courses, pro-
grams, certificates, and degrees; assesses student achievement of those outcomes; and uses
assessment results to make improvements,” Compton Center administration and faculty
need to continue to collaborate with El Camino College personnel to complete the design of
assessment tools to measure program and course effectiveness for student learning. See ad-
ditional information in Standard I-B, 4.2. The center should design a variety of assessment
tools that are clear measures of what is being taught and use the results of assessment to im-
prove instruction. These results and the changes that come from them should be documented.
2. Although some tools are still in the design phase, substantial progress has been made since
the last visit. SLOs have been identified for courses and student services programs. Assess-
ment tools and rubrics are under development and some use has been made of the assessment
results obtained thus far.
ACCJC Standard I 65
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
66 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 4.4 – Assessment and Accountability –
Availability of Data
Professional Standard:
Faculty and administrators are provided with data in a timely and accessible format, and with train-
ing in order for them to analyze and solve issues of student learning outcomes.
Sources and Documentation:
1. Interviews with administrators and faculty
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Office of Institutional Research and the Office of Academic Affairs at El Camino Col-
lege provide technical support and data for Compton Center faculty and staff to enable them
to make data-driven decisions. Data for the preparation of program reviews and the Educa-
tional Master Plan are available. The Office of Institutional Research has a calendar of data
production timelines. Additionally, California community colleges receive data from the
Chancellor’s Office that enables them to compare their performance in key areas (e.g., gradu-
ation rates, transfer rates, completion rates) to other colleges.
The Compton Center has a research analyst funded by basic skills funds, and plans to add a
half-time research associate.
The Compton Center should design a plan for data management to provide the faculty and
administration with adequate data to systematically review all courses and programs to de-
termine “their relevance, appropriateness, achievement of learning outcomes, currency, and
future needs and plans.” (ACCJC Standards, 2002.) The system should collect valid and reli-
able data at the course, program, certificate and degree levels. Protocols should be established
for data analysis so it is presented in user-friendly formats.
2. As more learning outcomes are assessed, the faculty will need the results to enable them
to improve instruction. At present, the El Camino Office of Institutional Research provides
some training to faculty in the use of such data. Since these measurements are still being de-
veloped, it is unknown how the data will be analyzed and shared. Further, faculty may need
training in interpreting the data. To fully meet this standard, the institution will need to show
evidence of the collection, interpretation and use of the assessment data.
The Compton Center should establish protocols for data use by administration, faculty, and staff at
all levels of the institution to continuously examine and improve services for student success. There
should be a systematic cycle for examining data to ensure that the educational program at the cen-
ter remains relevant and current to the changing needs of the client. Personnel should be assigned
and trained to administer the design and delivery of data collection, analysis and use. Training in
data interpretation and use should be provided for administrators and faculty to address issues of
student learning. The collection, interpretation and use of assessment data should be documented.
ACCJC Standard I 67
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 6
Implementation Scale:
68 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 5.1 – Professional Development Planning
Professional Standard:
Professional development demonstrates a clear understanding of purpose, written goals, and appro-
priate evaluations.
Sources and Documentation:
1. Interview with the associate dean working with SLOs
2. Interview with the vice president of Compton Center
3. Interviews with division chairs
4. Interviews with two academic deans
Progress on Implementing the Recommendations of the Recovery Plan:
1. The faculty at the Compton Center and the El Camino CCD Torrance campus continue to
collaborate on staff development plans, to the benefit of both entities.
2. During prior review periods, FCMAT recommended that the center continue to monitor the
relationship of the Institutional Priorities and the Faculty Professional Development Project
to ensure that the projects mirror the priorities. During this review period, interviews indi-
cated that the professional development plans have shifted focus. There were concerns by
some center faculty and administrators that relying so heavily on the relationship between
the evaluation and staff development plans might not be the best way to enhance professional
development. The interest now is in moving professional development in a different, more
dynamic direction. During this review period, the center has focused on large-scale planning,
including the Enrollment Management Plan, the Comprehensive Master Plan, annual plans,
the reorganization and refocusing of the Institutional Effectiveness Committee, and the real
advent of the Planning and Budget Committee.
Much work in 2011-12 was focused on professional development activities, especially activi-
ties that involved training for faculty to become better teachers and to integrate SLOs and
assessment into their classes and programs. Thus, the On Course program, the First Year
Experience for students (from one cohort to four), the Student Success Initiative, and the as-
sociated work and training all served to provide faculty with professional development. The
emphasis during this review period was more focused on individual conferences that can be
discipline- or teaching-related. Interviews indicated there are funds for conferences and that
applications to attend are being submitted. In addition, the Compton Center faculty is invited
to staff development activities on the El Camino CCD Torrance campus, and because the col-
laborative relationship between the two faculties continues to thrive, this is a viable option.
The center should provide continued training on assessment, student success, basic skills, re-
tention, and other topics that are part of the planning efforts.
3. During this review period, the center has reorganized the process of faculty development.
The Academic Senate formed the new Faculty Development Committee, which includes
ACCJC Standard I 69
three faculty members who are also on the Professional Development Committee. Interviews
indicated this is a more cohesive process to oversee professional development activities for
faculty and staff. The center should evaluate the new focus and process to ensure they meet
professional development needs.
4. During the previous visit, a concern was raised about the need for training in peer evalua-
tions. With new hires planned for the upcoming academic year and more for the next several
years, the turnover in full-time faculty will require new members of the academic community
to be well-trained in peer evaluation. Staff development efforts can focus on these activi-
ties, which will also improve communication between faculty members and improve student
learning through stronger teaching.
5. Development of a mentoring program may also provide professional development opportuni-
ties. The center offered a retirement incentive program for faculty during this review period.
This reduced the number of experienced faculty and also provided the opportunity to hire
new faculty. The complexity of a college campus is such that a mentor program may be an
excellent way to provide a seamless integration into the campus culture for new staff, while
providing professional development opportunities among both senior and junior faculty.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
70 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 5.2 – Professional Development
To Improve Instruction
Professional Standard:
Professional development provides the faculty and staff with the knowledge and the skills to improve
instruction and the curriculum.
Sources and Documentation:
1. Interviews with department chairs
2. Interviews with academic deans and the associate dean
3. Interview with the vice president of Compton Center
4. Unit plans for academic programs, CTE, Health and Human Services, and Institutional
Research
Progress on Implementing the Recommendations of the Recovery Plan:
1. Previous review periods included a recommendation to adhere to the faculty evaluation pro-
cess that includes a professional development plan and to assess the effectiveness of the plans
as they support the institutional priorities. Interviews with the academic deans indicated that
in fall 2012, the center would finalize the evaluation and professional development plan pro-
cess. During this review period, interviews indicated that the focus on professional develop-
ment activities has shifted. As mentioned in Standard I-B, 5.1, the center has set aside funds
to support professional development conferences for faculty, and they are taking advantage
of this opportunity. The development of individual plans for professional development activi-
ties such as On Course are not as needed because the Professional Development Commit-
tee is now focused on activities that bring both individual and collaborative activities to the
faculty. For example, 15 faculty members attended a First Year Experience retreat to discuss
the growth of this program and the content and focus of it. The center had four cohorts of stu-
dents during 2012-13, and the expanse of the First Year Experience efforts need to be planned
and the implementation evaluated. The center should evaluate the success of the new profes-
sional development focus as it relates to student learning.
2. The continued review and evaluation of the professional development plans and activities at
the Compton Center is a good way to improve professional development offerings and keep
the faculty and staff current with the learning opportunities available. It also provides data
and evidence of what benefits students in their learning activities. Continued evaluation will
help to improve this process.
ACCJC Standard I 71
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 6
Implementation Scale:
72 ACCJC Standard I
ACCJC Standard I-B: Improving Institutional Effectiveness
FCMAT Academic Achievement Standard 5.7 – Professional Development –
Evaluation and Constructive Feedback
Professional Standard:
Evaluations provide constructive feedback for improving job performance. Additional professional
development is provided to support employees with less than satisfactory evaluations.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with two deans
3. Collective bargaining agreement with the Compton Community College Federation of
Employees (Certificated Unit), Article X – Evaluation, July 1, 2010 through June 30, 2013
4. Professional development activities documents
Progress on Implementing the Recommendations of the Recovery Plan:
1. Previous review periods included a recommendation for the center to develop an assessment
process for individual professional development plans that tie to student learning and student
success. Discussions with the campus administration indicated this has not been done except
in the counseling area and some in the nursing area. The development of the individual plans
as part of the evaluation process has not moved forward due to the center’s intense efforts in
large-scale planning (see Standard I-B, 5.1), and the reorganizing of the Professional Devel-
opment and Institutional Effectiveness committees. Interviews indicated that the shift in fo-
cus for professional development activities will support student learning and help the faculty
and staff to improve their professional skills.
2. If a performance evaluation shows a need for improvement, the center, working with the af-
fected faculty or staff member, should include professional development plans to assist the
employee in these efforts.
3. The center should develop a process for tying professional development activities to the eval-
uation process, when needed, now that the planning documents and some of the committee
responsibilities have changed.
ACCJC Standard I 73
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
74 ACCJC Standard I
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard II: Student Learning Programs and Services
The institution offers high-quality instructional programs, student support services, and library and
learning support services that facilitate and demonstrate the achievement of stated student learning
outcomes. The institution provides an environment that supports learning, enhances student under-
standing and appreciation of diversity and encourages personal and civic responsibility as well as
intellectual, aesthetic, and personal development for all its students.
A. Instructional Programs – The institution offers high-quality instructional programs in
recognized and emerging fields of study that culminate in identified student outcomes
leading to degrees, certificates, employment, or transfer to other higher education insti-
tutions or programs consistent with its mission. Instructional programs are systemati-
cally assessed in order to assure currency, improve teaching and learning strategies, and
achieve stated student learning outcomes. The provisions of this standard are broadly
applicable to all instructional activities offered in the name of the institution.
1. The institution demonstrates that all instructional programs, regardless of location or means
of delivery, address and meet the mission of the institution and uphold its integrity.
a. The institution identifies and seeks to meet the varied educational needs of its students
through programs consistent with their educational preparation and the diversity, de-
mographics, and economy of its communities. The institution relies upon research and
analysis to identify student learning needs and to assess progress toward achieving stated
learning outcomes.
b. The institution utilizes delivery systems and modes of instruction compatible with the ob-
jectives of the curriculum and appropriate to the current and future needs of its students.
c. The institution identifies student learning outcomes for courses, programs, certificates, and
degrees; assesses student achievement of those outcomes; and uses assessment results to
make improvements.
2. The institution assures the quality and improvement of all instructional courses and programs
offered in the name of the institution, including collegiate, developmental, and pre-collegiate
courses and programs, continuing and community education, study abroad, short-term train-
ing courses and programs, programs for international students, and contract or other special
programs, regardless of type of credit awarded, delivery mode, or location.
a. The institution uses established procedures to design, identify learning outcomes for, ap-
prove, administer, deliver, and evaluate courses and programs. The institution recognizes
the central role of its faculty for establishing quality and improving instructional courses
and programs.
b. The institution relies on faculty expertise and the assistance of advisory committees when
appropriate to identify competency levels and measurable student learning outcomes for
courses, certificates, programs including general and vocational education, and degrees.
The institution regularly assesses student progress towards achieving those outcomes.
c. High-quality instruction and appropriate breadth, depth, rigor, sequencing, time to com-
pletion, and synthesis of learning characterize all programs.
ACCJC Standard II 1
d. The institution uses delivery modes and teaching methodologies that reflect the diverse
needs and learning styles of its students.
e. The institution evaluates all courses and programs through an ongoing systematic review
of their relevance, appropriateness, achievement of learning outcomes, currency, and fu-
ture needs and plans.
f. The institution engages in ongoing, systematic evaluation and integrated planning to as-
sure currency and measure achievement of its stated student learning outcomes for cours-
es, certificates, programs including general and vocational education, and degrees. The
institution systematically strives to improve those outcomes and makes the results avail-
able to appropriate constituencies.
g. If an institution uses departmental course and/or program examinations, it validates their
effectiveness in measuring student learning and minimizes test biases.
h. The institution awards credit based on student achievement of the course’s stated learn-
ing outcomes. Units of credit awarded are consistent with institutional policies that reflect
generally accepted norms or equivalencies in higher education.
i. The institution awards degrees and certificates based on student achievement of a pro-
gram’s stated learning outcomes.
3. The institution requires of all academic and vocational degree programs a component of gen-
eral education based on a carefully considered philosophy that is clearly stated in its catalog.
The institution, relying on the expertise of its faculty, determines the appropriateness of each
course for inclusion in the general education curriculum by examining the stated learning
outcomes for the course.
General education has comprehensive learning outcomes for the students who complete it,
including the following:
a. An understanding of the basic content and methodology of the major areas of knowledge:
areas include the humanities and fine arts, the natural sciences, and the social sciences.
b. A capability to be a productive individual and life long learner: skills include oral and
written communication, information competency, computer literacy, scientific and quan-
titative reasoning, critical analysis/logical thinking, and the ability to acquire knowledge
through a variety of means.
c. A recognition of what it means to be an ethical human being and effective citizen: qualities
include an appreciation of ethical principles; civility and interpersonal skills; respect for
cultural diversity; historical and aesthetic sensitivity; and the willingness to assume civic,
political, and social responsibilities locally, nationally, and globally.
4. All degree programs included focused study in at least one are of inquiry or in an established
interdisciplinary core.
5. Students completing vocational and occupational certificates and degrees demonstrate techni-
cal and professional competencies that meet employment and other applicable standards and
are prepared for external licensure and certification.
6. The institution assures that students and prospective students receive clear and accurate
information about educational courses and programs and transfer policies. The institution
describes its degrees and certificates in terms of their purpose, content, course requirements,
2 ACCJC Standard II
and expected student learning outcomes. In every class section, students receive a course
syllabus that specifies learning objectives consistent with those in the institution’s officially
approved course outline.
a. The institution makes available to its students clearly stated transfer-of-credit policies in
order to facilitate the mobility of students without penalty. In accepting transfer credits to
fulfill degree requirements, the institution certifies that the expected learning outcomes for
transferred courses are comparable to the learning outcomes of its own courses. Where
patterns of student enrollment between institutions are identified, the institution develops
articulation agreements as appropriate to its mission.
b. When programs are eliminated or program requirements are significantly changed, the
institution makes appropriate arrangements so that enrolled students may complete their
education in a timely manner with a minimum of disruption.
c. The institution represents itself clearly, accurately, and consistently to prospective and
current students, the public, and its personnel through its catalogs, statements, and publi-
cations, including those presented in electronic formats. It regularly reviews institutional
policies, procedures, and publications to assure integrity in all representations about its
mission, programs, and services.
7. In order to assure the academic integrity of the teaching-learning process, the institution uses
and makes public governing board-adopted policies on academic freedom and responsibility,
student academic honesty, and specific institutional beliefs or worldviews. These policies
make clear the institution’s commitment to the free pursuit and dissemination of knowledge.
a. Faculty distinguish between personal conviction and professionally accepted views in a
discipline. They present data and information fairly and objectively.
b. The institution establishes and publishes clear expectations concerning student academic
honesty and the consequences for dishonesty.
c. Institutions that require conformity to specific codes of conduct of staff, faculty, adminis-
trators, or students, or that seek to instill specific beliefs or worldviews, give clear prior
notice of such policies, including statements in the catalog and/or appropriate faculty or
student handbooks.
8. Institutions offering curricula in foreign locations to students other than U.S. nationals oper-
ate in conformity with standards and applicable Commission policies.
Use of FCMAT Professional and Legal Standards
Since 1998 the Fiscal Crisis and Management Assistance Team (FCMAT) has been involved in
assisting California K-12 school districts under State Administration to return to local governance.
FCMAT developed a standards-based assessment tool as part of this work, and has adapted it for
use in assessing and monitoring the Compton Community College District. FCMAT professional
and legal standards are being used in conjunction with the Accrediting Commission for Community
and Junior Colleges (ACCJC) standards, as Compton Community College District seeks not only to
return to local governance but also seeks to re-establish its academic accreditation.
ACCJC Standard II 3
For ACCJC Standard II – Student Learning Programs and Services, appropriate FCMAT standards
from the operational area of Academic Achievement have been used to measure progress on ACCJC
Standards II-A, II-B and II-C. The Accrediting Commission for Community and Junior Colleges will
conduct its own accreditation review to determine when accreditation will be restored to the Comp-
ton Community College District. It is hoped that by addressing the recommendations made in this
report to implement the FCMAT professional and legal standards, the Compton Community College
District (CCCD) will be assisted in readying itself for the ACCJC accreditation review in the future.
Each professional and legal standard has been provided a score, on a scale of 0 to 10, as to the
CCCD’s implementation of the standard at this particular point in time. These ratings provide a basis
for measuring the district’s progress over the course of time.
4 ACCJC Standard II
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard II: Student
Rating Rating Rating Rating Rating Rating Rating Rating
Learning Programs and Services
A. Instructional Programs
Standard to be Addressed
Planning Process - Academic Achievement
The administrative structure of the college
1.2 1
promotes student learning outcomes.
The college’s planning process focuses
1.6 on supporting increased student 0 1 1 5 5 6 7 8
performance.
Curriculum - Academic Achievement
The college, through its adopted policies,
2.1 provides a clear operational framework 4 4 4 7 7 7 7 6
for management of the curriculum.
Policies regarding curriculum and
2.2 instruction are reviewed and approved by 8
the Governing Board.
The college has clear and valid objectives
2.3 to promote student learning and a 4 4 4 6 6 7 7 7
process for curriculum development.
A process is in place to maintain
2.4 alignment among standards, practices, 1 1 3 5 5 6 7 7
and assessments.
Sufficient instructional materials are
2.6 1 2 3 5 5 6 6 7
available for students to learn.
The college has adopted a plan for
2.10 integrating technology into curriculum 2 3 3 6 6 7 7 8
and instruction.
Instructional Strategies - Academic Achievement
The college provides equal access to
educational opportunities to all students
3.1 1
regardless of race, gender, socioeconomic
standing, and other factors. [EC 51007]
Challenging learning goals and student
learning outcomes and individual
3.2 1 2 2 5 5 6 7 7
educational plans and programs for all
students are evident.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard II 5
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard II: Student
Rating Rating Rating Rating Rating Rating Rating Rating
Learning Programs and Services
Students are engaged in learning, and
3.4 they are able to demonstrate and apply 2 2 3 5 5 6 7 7
their knowledge.
The college provides access and encourages
3.24 student enrollment in transfer programs to 1
four-year institution of higher learning.
The standards in bold text are the identified subset of standards for ongoing reviews.
6 ACCJC Standard II
ACCJC Standard II-A: Instructional Programs
FCMAT Academic Achievement Standard 1.6 – Planning Process –
Student Support
Professional Standard:
The college’s planning process focuses on supporting increased student performance.
Sources and Documentation:
1. Interviews with three division chairs
2. Interviews with the vice president of student services and the vice president of academic
affairs, El Camino College Torrance campus
3. Interview with the vice president of Compton Center
4. Interviews with two academic deans and the dean of student services
5. Flow chart of planning process
6. El Camino College Educational Master Plan, 2010-15
7. Long range planning documents, prepared since April 2012
8. Program Review status document and program reviews in student services and academic
affairs
9. First Year Experience documents
10. Annual plans, 2012-13
11. Student Success Plan, December 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. During the previous review periods, there was continued concern with the English as a Sec-
ond Language (ESL) program; this concern was also expressed during this review period.
Specifically, the relationship between noncredit and credit ESL continues to be problematic.
During this review period, non-credit ESL classes were only half full and students complet-
ing them did not regularly move into the credit ESL program. Enrollment in the credit ESL
courses was also low.
During this review period, significant staffing changes were made in the ESL program: one
faculty member moved to counseling; one is on leave and will return to teach English; and
one full-time faculty member and three adjuncts are teaching ESL. The goal is to move stu-
dents quickly through the non-credit courses and into the credit courses. Attention to sched-
ules has resulted in the development of an evening and a morning program. Interviews indi-
cated that these changes will be evaluated for both the success of students and effectiveness
of FTES in the program. The center should continue to evaluate all the ESL courses to ensure
maximum effectiveness.
2. FCMAT reviewed the learning communities’ project with appropriate staff and administra-
tors. This project, called the First Year Experience, has been operational for four years and
continues to be successful. There were four cohorts during 2012-13, including a Brother to
Brother community that is partially funded through a grant. The Compton Center institution-
alized the program through funding in 2010. The program has a full-time coordinator/coun-
selor. The increase in the number of cohorts is one indicator of its success. Most students
ACCJC Standard II 7
enrolled in the First Year Experience have been successful, as measured by the examination
of course completion numbers and retention rates. Data is coming in for the First Year Expe-
rience program, and interviews indicated that it will be reviewed and used to plan other sup-
port programs as needed. The center should evaluate and use the data from the assessment of
the First Year Experience program to plan and strengthen the program.
3. Most faculty at the Compton Center have participated in the On Course program, and inter-
views indicated it is well integrated into the learning culture at the center. Thus, the number
of On Course training clusters currently offered is fewer than in previous review periods.
However, 28 new faculty members will be hired at the El Camino CCD Torrance campus and
Compton Center, and there are plans to offer them the On Course program.
4. The Supplemental Instruction program also continues to help with student retention. This
program continues to be expanded and is now incorporated into some of the accelerated math
classes. As the Student Success Committee continues to work with ideas to support and en-
hance student success, interviews indicated that more techniques will be explored and piloted
as funds are available. This committee should provide leadership for continued initiatives in
this area, and the center should implement the committee’s plans and evaluate them at the
end of each semester to determine how they affect student success.
5. The Student Success Plan, adopted in December 2012, outlines the six adopted strategies for
this plan. The initial plan was reviewed and used as a baseline for the revised plan, and the
six strategies include significant changes and updates. Each strategy has defined objectives
with identified departments or individuals who will be involved as well as projected time-
lines, related program plans, and/or alternative sources of funding. The plan will be reviewed
by the Consultative Council committees for final approval in spring 2013. This plan deals
with a variety of student success strategies including matriculation processes, basic skills
courses, academic support resources and services including tutoring in all disciplines as ap-
propriate, institutionalization, expansion of learning communities, and several others. Each of
these general headings also outlines many more specific areas and tasks that will be instituted
and evaluated.
6. A variety of initiatives at the Compton Center are directly focused on student success. These
include programs in the academic areas (Supplemental Instruction and learning communities/
First Year Experience) as well as student support programs from the student services area.
The center should continue to offer these programs, pending assessment of them, and plan
other programs that will provide opportunities for student success.
8 ACCJC Standard II
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard II 9
ACCJC Standard II-A: Instructional Programs
FCMAT Academic Achievement Standard 2.1 – Instructional Strategies –
Curriculum Management
Professional Standard:
The college, through its adopted policies, provides a clear operational framework for management of
the curriculum.
Sources and Documentation:
1. Interviews with two Compton Center Curriculum Committee members
2. Interviews with Compton Center academic administrators
3. El Camino College Compton Center curriculum development/approval process
4. El Camino College Curriculum Handbook
5. El Camino College Compton Center syllabi template sample
6. Student Learning Outcomes document, Compton Center, 2012-13
7. Student Learning Outcomes and Assessment Handbook (El Camino College, Torrance
campus), 2012-13
8. Compton Center course syllabi, fall 2012 and spring 2013
9. El Camino College Catalog 2012-13, Compton Center Edition
Progress on Implementing the Recommendations of the Recovery Plan:
1. The responsibility for curriculum development rests with El Camino College. Since the
Compton Center is an educational center of El Camino College, it is not permitted to develop
curriculum outside the established and board-approved process of El Camino CCD. This rela-
tionship is mandated by WASC and the MOU between El Camino CCD and Compton CCD.
El Camino College and thus the Compton Center follow the curriculum policies developed
by the statewide Senate and the El Camino CCD Board of Trustees. The El Camino CCD
Curriculum Committee meets twice a month and has two faculty members from the Compton
Center as voting members. Career technical education (CTE) courses are reviewed every two
years and other courses are reviewed once every six years by the Curriculum Committee. The
Curriculum Committee will review 98 courses in spring 2013 (15 in business, 21 in fine arts,
9 in health sciences and athletics, 14 in humanities, 30 in industry and technology, 3 in math,
and 6 in natural science). The Compton Center should continue to work collaboratively with
El Camino College to support the curriculum.
2. During the previous review period, the El Camino CCD Curriculum Committee agreed that
all courses and course revisions going through the curriculum process would have assess-
ments completed by fall 2012. A review of 44 course syllabi for the academic year 2012-13
shows that all have at least one SLO (most do not have more than one) and that 14 of the 44
reviewed do not have assessment criteria on the documents. Progress is being made in both
the SLO (99% of all courses to have at least one by the end of spring 2013) and assessment
areas. Approximately 90% of the courses have assessments and 60% of the programs have
assessments. The Compton Center and the El Camino CCD Torrance campus are working
hard to complete these, and it is expected that by the end of spring 2013 a much higher num-
ber of courses and programs will have assessments.
10 ACCJC Standard II
3. The six core competencies have been adopted with completion dates. These are now the
Institutional Learning Outcomes (ILOs) that drive both course and program learning out-
comes. They are: Communication and Comprehension (completed in fall 2010); Creative and
Analytical Thinking (completed in spring 2011); Community and Collaboration (completed
in fall 2012); Professional and Personal Growth (completed in spring 2012); Information
Technology Literacy, which will be completed in spring 2013; and Content Knowledge to be
completed in fall 2013. However, the sixth ILO has not been reviewed and analyzed for ef-
fectiveness. The center should complete the review and analysis of the sixth ILO by the end
of fall 2013. The ILOs should tie the program and course learning outcomes together.
4. The use of CurricUNET and housing the SLOs and program learning outcomes (PLOs) in the
online system was to provide the centralization needed and a way to monitor the completion
of the outcomes and assessments. However, as mentioned previously, problems with Cur-
ricUNET have caused delays in centralizing the data. The center is reviewing other data sys-
tems (such as TrackDat) which are simpler and may be less problematic.
The goal to complete all SLOs by fall 2012, along with assessments, has come a long way,
but it is not complete. The center must complete the SLOs and the appropriate assessment
criteria for all courses it offers. The SLOs and assessment criteria should be placed on all
first-day handouts and continue to be housed in the center’s data system. A review of the
college catalog found that PLOs are referenced in the catalog, directing students to the appli-
cable website.
5. The curriculum process at El Camino College is well organized and apparently clear to both
campuses. In the fall semester the Curriculum Committee deals with catalog issues, such as
new programs and courses, so that they can be included in the annual course catalog. The
spring semester is devoted to course review. This process seems to work well.
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 7
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard II 11
ACCJC Standard II-A: Instructional Programs
FCMAT Academic Achievement Standard 2.3—Curriculum—Management and
Quality
Professional Standard:
The college has clear and valid objectives to promote student learning, and a process for curriculum
development.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with two Compton Center Curriculum Committee members
3. Interviews with academic deans and department chairs
4. Compton Center course syllabi, fall 2012 and spring 2013
5. El Camino College Compton Center Course Schedule, summer 2012, fall 2012, winter/spring
2013
6. El Camino College Curriculum Handbook
7. Compton Center Curriculum Committee minutes, fall 2012 to April 2013
8. El Camino Curriculum Review Timeline, spring 2013
9. Selected program reviews
Progress on Implementing the Recommendations of the Recovery Plan:
1. During the visit last year, interviews with the academic deans indicated that more than 90%
of all courses had both SLOs and assessment criteria, and 58% of the courses had been as-
sessed. Interviews further indicated that 100% of the courses would have SLOs and assess-
ment criteria by fall 2012. The SLOs and assessment criteria are housed in CurricUNET.
While the center (since all curriculum goes through the Curriculum Committee) has made
impressive strides in completing SLOs for all courses, most courses have only one. In addi-
tion, the assessments are occurring but they are not 100% complete. The center has encoun-
tered problems with CurricUNET and there is discussion about changing to another system.
Interviews indicated that the Curriculum Committee is beginning discussions on multiple
SLOs the week of April 22. The center should ensure that multiple SLOs and assessment cri-
teria are complete for all courses and that all courses have been assessed.
2. A strong program review document that is research based and provides thoughtful analysis of
student learning data is critical to assess student learning. This is part of the new focus of the
Institutional Effectiveness Committee. During the prior review period, the Institutional Effec-
tiveness Committee was in the process of changing its mission and function. It now focuses
on the oversight of program review. The committee is charged with ensuring that the reviews
address the appropriate issues, ensuring consistency and quality, evaluating the plans and
linkages and tying the program reviews to budget and planning. The biology program review
has been reviewed by the Institutional Effectiveness Committee; three additional program re-
views will follow.
12 ACCJC Standard II
A Planning and Budget Committee meets regularly and ensures that the budgets and planning
tie together. The process for funding items at the center includes the Plan Builder. The Plan
Builder is reviewed and updated at least twice each academic year. If items are not included
in Plan Builder, funding requests are denied. In addition, the program reviews include pro-
posed equipment and staffing requests so that budget clearly ties to program.
The program review documents reviewed by FCMAT during this visit included stronger data
identifying the relationship between learning outcomes and assessment and tying program
needs to budget. The center should develop a method to assess the effectiveness of the Insti-
tutional Effectiveness Committee’s work, including its relationship to student success.
3. The curriculum relationship between the faculty at the Compton Center and the El Camino
CCD Torrance campus continues to be collaborative, and this bodes well for the whole SLO/
assessment effort at the center. This institutional relationship is essential for the assessment
tasks that must be completed. The center should continue to support the collegial relation-
ships between the faculties on both campuses.
4. The Professional Development Committee has its own budget. The committee at the Comp-
ton Center is chaired by the director of human resources and the associate dean of academic
affairs and includes four faculty members. The professional development efforts over the past
two years at the center have been robust. Interviews indicated that while there is still interest
and attention on professional development, it is now more individualized. Previously, profes-
sional development was a significant part of the faculty evaluation process. While it is still
included, the center’s attention has been refocused on learning outcomes and assessment,
program review, unit plans, and student support.
In previous years, many of the faculty fulfilled their professional development plans through
group development activities, such as On Course. Because most of the faculty has completed
these activities, there is more interest in discipline-focused staff development, which has
been the direction during this review period.
Part of the staff development focus last year was on the recently developed Educational Mas-
ter Plan (EMP). Continued discussion about the EMP, the core competencies, assessment and
learning outcomes will be the major focus of staff development. As previously recommend-
ed, the center should continue to review and assess the staff development activities and tie
them to student learning. The future focus of the center, student learning, and student success
should be at the core of these discussions.
5. The refocusing of the Institutional Effectiveness Committee on program review, the advent of
the Educational Master Plan, the conscious correlation of program review to the budget and
the attention to SLOs, PLOs and assessment should bode well for student success and student
learning.
6. Standard 2.1 provides additional information on the curriculum process.
ACCJC Standard II 13
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
14 ACCJC Standard II
ACCJC Standard II-A: Instructional Programs
FCMAT Academic Achievement Standard 2.4 - Curriculum Alignment
Professional Standard:
A process is in place to maintain alignment among standards, practices and assessments.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with two Compton Center Curriculum Committee members
3. Interviews with two academic deans
4. Interviews with the associate dean of academic affairs and the SLO coordinators
5. Compton Center course syllabi, fall 2012 and spring 2013
6. El Camino College Curriculum Handbook
7. Curriculum Committee minutes
8. Planning and Budget Committee agendas and minutes
Progress on Implementing the Recommendations of the Recovery Plan:
1. Approximately 99% of courses have SLOs and many have assessment criteria. The SLOs and
assessment criteria are listed on CurricUNET. The center should continue to work with the El
Camino CCD Curriculum Committee to develop multiple SLOs and assessment criteria for
all courses and ensure that all courses have been assessed.
2. The faculty SLO facilitators have been working individually and collectively with faculty to
develop SLOs and assessment criteria. The hiring of an associate dean has provided direct
management assistance with this effort. The person in this position will be leaving and there
are no plans to replace the position. It will be incumbent upon the deans, working with the
faculty, to complete this project so that all courses have the required learning outcomes and
assessment criteria in place. The Curriculum Committee will assume the responsibility for all
new courses going through the approval process to have the required outcomes and assess-
ments in the course outline of record. The center should continue to ensure that this occurs.
3. The course syllabi reviewed by FCMAT during this visit continue to be more complete and
standardized. The team reviewed the courses for learning outcomes and assessment as well
as for the required information for students. The inclusion of information such as attendance
policies, ethics policies, classroom decorum, grading and other course information in the
standard format makes it easier and clearer for students to understand what is expected of
them in each class. This information was included in the random sample of courses that were
reviewed. The center should continue to ensure that all course syllabi include all of the re-
quired information to facilitate student understanding of the course and center requirements
necessary to help them become successful.
4. The Planning and Budget Committee takes an active role in ensuring consistency in the re-
lationship between planning and budget allocation. The committee comprised of seven to
nine campus members meets regularly to ensure that the unit plans, program review, and
plan builders all include the items requested in department budgets. It is essential for budget
ACCJC Standard II 15
requests to have a basis in planning and evaluation, and this process should be refined and
adhered to. The key planning documents throughout the center are on a clear timeline; for
example, program reviews are on a four year cycle and plan builders are reviewed twice an-
nually. Since fall 2011, all courses and program level SLOs are assessed every four years, in
alignment with the Program Review cycle. This is vital for consistency and implementation
of plans.
5. The alignment for assessment is occurring in some departments at the center. The depth of
discussion varies among disciplines. For example, at their June 15, 2013 meeting the English
departments at the Compton Center and the El Camino CCD Torrance campus were to be
norming the assessment for the research paper required for English 1A, and the Nursing De-
partment meets once or twice a month to discuss assessment issues, which is documented in
the meeting minutes.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
16 ACCJC Standard II
ACCJC Standard II-A: Instructional Programs
FCMAT Academic Achievement Standard 2.6 – Curriculum – Sufficient Materials
Professional Standard:
Sufficient instructional materials are available for students to learn.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with Compton Center librarian and library staff
3. Interviews with deans and the supervising administrator of the LRC
4. Interviews with staff involved in the Student Success efforts
5. Meeting with student leaders
6. Area annual plans, 2012-13
7. Student Success Plan, December 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Learning Resource Center (LRC) has flaws in the construction, and the date for open-
ing has been delayed numerous times. During the prior visit, staff indicated that the building
was to become operational in fall 2013. The new estimated date for opening is spring 2014.
The Compton Center continues to work on the design issues with the applicable parties. In-
terviews indicated that 60 out of the previous 160 items on the punch list still need Division
of the State Architect approval. In the meantime, students are using the former LRC building.
The Compton CCD should continue to push for opening the new LRC because the center can
provide students with a variety of learning support tools and traditional library services.
2. The Compton Center faculty continues to be actively involved in updating the library collec-
tion, and some faculty members participate in the removal process for older materials. There
is a functioning advisory committee composed of division representatives that meet at least
twice a semester to work with the library staff in updating and culling materials. The library
continues to rely more on databases, especially given the tight budget and the high cost of
books.
3. The center’s academic librarian has been on campus about two years. During the last visit,
the center was searching for an instructional specialist. That position is filled and this struc-
ture has allowed the chief librarian to move out of the learning/tutoring center and back to the
library. Thus, the library is able to expand services to students and faculty and support stu-
dent learning in a more comprehensive way.
4. The Student Success Plan is an important component of this standard as the plan focuses
on basic skills students. The Student Success Plan (approved in December 2012) outlines
very specific plans that focus on student success. The plans are reflected by category, objec-
tive, groups involved, timeline, and plan/budget source. The document addresses a variety
of support materials and programs that are focused on student learning. The Student Success
Committee met once in spring 2013. The plan is approved but has not yet been implemented.
Each stakeholder (for example, basic skills, retention, and recruitment) has developed goals
ACCJC Standard II 17
and timelines and identified the person or group responsible. Interviews indicated that the
center intends to hire a new dean (to replace one who retired) and that person will spearhead
the Student Success Plan. The plan went through the shared governance process, the Aca-
demic Senate, Consultative Council, and Planning and Budget Committee.
In a meeting with the associated student body (ASB) leadership, the team found that the stu-
dents are satisfied with the help and support they receive from the center staff and faculty and
praise the learning that occurs. Resources are available and students seem to access them.
The center should continue to support the efforts of the Student Success Committee as its
members explore different ways to provide direct and indirect student support for classes and
learning.
5. The Student Success Plan outlines five strategies: 1) establish a Student Success Committee
and assign administrative leadership; 2) evaluate and modify/enhance matriculation processes
and policies focusing on barriers; 3) provide support for discipline faculty and revise basic
skills courses; 4) provide academic support resources and services, including tutoring in all
disciplines as appropriate; and 5) institutionalize and expand learning communities. The cen-
ter should begin work on these strategies as soon as possible and provide a means to evaluate
the success of them after a year.
6. The tutoring center provides numerous resources for students. It has updated Plato and New
Century software resources and includes Rosetta Stone software for ESL students. Student
use of the tutoring center continues to increase and more students are taking advantage of the
services offered. The tutoring center has developed policies and procedures for tutors. The
handout for tutors is thorough and points out the need for tutors to be responsible for dealing
with day-to-day problems and to enforce rules. It also counsels them on their duties. It is im-
portant that the center continue to develop formal written documents for programs and proce-
dures as it fosters clear communication and identifies lines of responsibility.
7. The statewide Telecommunications and Technology Infrastructure Program (TTIP) funding,
used to support materials and programs, is no longer available to colleges and centers. During
the previous visit, the team recommended that the center develop a plan to address the bud-
get implications from the loss of TTIP funding. For a couple of years the district back filled
the resources so that the library could continue to provide material for students. The state
bought databases for the statewide consortium so the district no longer has to backfill and the
resources are available to students. The campus continues to rely on databases rather than
books since they are supported by state funding and seem to be working well for students.
18 ACCJC Standard II
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard II 19
ACCJC Standard II-A: Instructional Programs
FCMAT Academic Achievement Standard 2.10 - Curriculum -
Integrating Technology
Professional Standard:
The college has adopted a plan for integrating technology into curriculum and instruction.
Sources and Documentation:
1. Interviews with the librarian and deans
2. Interview with the vice president of Compton Center
3. Interview with the dean of career technical education (chair of the Technology Committee)
4. El Camino College Educational Master Plan, 2010-15
5. El Camino College Compton Center Technology Plan, 2011-16
6. Comprehensive Master Plan, 2012-17
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton Center previously completed an updated Technology Plan that reflects advanc-
es since the prior plan and provides planning direction through 2016. The plan includes all
aspects of technology at the Compton Center and continues to focus on instructional technol-
ogy directly in the classroom and to support the administration of technology (such as Cur-
ricUNET). Parts of this plan document have been updated and included in the two more com-
prehensive planning documents, the Educational Master Plan and the Comprehensive Master
Plan, 2012-17. Both of these plans are very detailed and provide guidelines for including
technology in the instructional program in a variety of ways. Interviews indicated that the
Technology Plan will be updated to cover fiscal years 2014-19. Although not part of the for-
malized professional development program, the center should continue to provide training for
faculty on integrating technology in their classes and assess the effectiveness of the technol-
ogy for student learning.
2. Because the center has an Educational Master Plan, the Technology Plan is easily tied to its
objectives. Continued attention to updating the Technology Plan is essential as technology
changes. Interviews indicated that the Technology Plan will be updated in 2014 to cover the
period through 2019. The center should continue to tie the Technology Plan to the Education-
al Master Plan to help ensure direct linkages for student learning and success.
3. The dean of career and technical programs oversees academic technology and continues
to involve the campus community in evaluating technology needs. The dean oversees the
12-member Technology Committee that includes managers, a classified staff member and
faculty members. The breadth of the committee allows for robust discussion and planning.
The committee meets monthly and has focused on the district’s management information
system (MIS) project. Phase 1 of the project, which included server room and MIS building
enhancements and an upgraded phone system, was completed in November 2012, except for
camera installation. The remaining project phases are dependent on future budget allocations.
The technology plan budget for 2013-14 is $199,000.
20 ACCJC Standard II
4. During some of the previous review periods, there were concerns regarding the lack of stu-
dent use of the technology labs. Interviews indicate that student use increased considerably
during the prior review period and has continued to increase during this review period. Inter-
views further indicated that students are taking advantage of the labs for individual work and
for group work and that students are taking greater advantage of the support services avail-
able to them. Two of the center’s labs have wireless capability and are packed with students
when open. In addition, instructional aides encourage students to use all the applications
available to them and they are heeding the advice. The center has reached out to faculty who
in turn are encouraging students to use the lab resources. Logs are now kept by the instruc-
tional aides showing numbers of students using the labs and what they are using them for.
This should provide the center a clearer sense of where to put the resources dedicated to tech-
nology to improve student learning and student success. As part of its student retention plan,
the center should continue to actively encourage students to use campus labs and support ser-
vices.
5. The Compton Center is aware of the value of technology to support student learning, and
staff now have a good sense of the planning needed for technology. Given the extensive
campus remodeling that is occurring, the center hopes to be able to replace some of the older
classrooms with new ones that have greater technological capabilities.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard II 21
ACCJC Standard II-A: Instructional Programs
FCMAT Academic Achievement Standard 3.2 - Instructional Strategies - Student
Plans and Outcomes
Professional Standard:
Challenging learning goals and student learning outcomes (SLOs) and individual educational plans
and programs for all students are evident.
Sources and Documentation:
1. Interviews with Compton Center administrators and faculty and El Camino College
administrators
2. Course outlines of record approved by El Camino College
3. Compton Center course syllabi, fall 2012 and spring 2013
4. Program Reviews
5. El Camino College Status Report on Learning Outcomes Implementation, submitted to the
ACCJC August 20, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. Faculty members from the Compton Center and El Camino College formed a joint commit-
tee to develop SLOs. In a report dated August 20, 2012 El Camino College reported to the
ACCJC that all courses and programs had at least one SLO. The report also indicated that as-
sessment of at least one SLO has been done in all courses and nearly 100% of the programs.
In addition, the report indicated that all student support services had identified at least one
SLO and 84% of the services had assessed at least one SLO. Course and program level SLO
assessment has been a high priority for the Compton Center. The center has developed an im-
pressive graphical model showing the linkages between the course, program and institutional
learning outcomes, and the faculty have adopted this model. Although considerable progress
has been made in course and program SLO identification and assessment, the ACCJC ex-
pects that more than one SLO is identified and assessed in each course and program. There is
ongoing discussion regarding whether it is effective to combine programs for the purpose of
review.
Accurate alignment between the body of knowledge in course objectives and the body of
knowledge described by SLOs is essential if the college is to “award credit based on student
achievement of the course’s stated learning outcomes” and the “program’s stated learning out-
comes” (ACCJC Standard II, 2h and 2i). This alignment implies that SLOs are course-bound,
meaning they are designed by course and are used by all who instruct that course to ensure that
student achievement is a measure of the course’s learning objectives. The English Consistency
Project, which outlines a common reading assignment and writing prompt for sections of Eng-
lish A, B, and C will contribute to the tight alignment of the body of knowledge and the objec-
tives in these courses. The essays will be normed using an approved rubric.
22 ACCJC Standard II
Institutional learning objectives (formerly called core competencies or degree-level learning
outcomes) have also been developed. The development is part of an assessment cycle that is
well-integrated between the El Camino CCD Torrance campus and Compton Center. There are
six core competency statements: content knowledge; critical, creative and analytical thinking;
communication and comprehension; professional and personal growth; community and collab-
oration; and information and technology literacy. Core competency assessment is coordinated
by the Assessment of Learning Committee, and assessments are conducted by randomly sur-
veying students and their professors in courses that are strongly tied to these competencies. As-
sessments have been performed for critical, creative and analytical thinking (spring 2011), com-
munication and comprehension (fall 2011), professional and personal growth (spring 2012),
community and collaboration (fall 2012), and information and technology literacy (spring
2013). Assessment of content knowledge is planned for fall 2013. Dialog about the results of
the assessment of communication and comprehension occurred during a summit held in Octo-
ber 2011. It is critical that the center engage in widespread dialog about the outcome of each of
the assessments as required by the accreditation standards of the ACCJC.
The development, assessment, and use of results of student learning outcomes have been
enhanced by the adoption of a facilitator model. Three faculty facilitators work directly with
other faculty to assist in the effort. Additionally, the center’s associate dean of academic af-
fairs has had responsibility for implementing SLOs. This associate dean will be leaving and
will not be replaced; instead, the duties of the three instructional deans have been reorga-
nized. One dean will have the title of dean of student success and will have responsibility for
student learning outcomes.
Much progress has been made in identifying, assessing and reflecting on SLOs. Multiple op-
portunities for training have been offered, and the faculty has taken advantage of them. By
2012, the ACCJC expected all community colleges to be at the proficiency level for SLOs.
This means that the results of assessments are being used for improvement, with widespread
institutional dialogue about the results. Compton Center and El Camino faculty and staff
members must continue their joint efforts to develop all learning outcomes and methods of
assessing them as required by the ACCJC. The next step is to show the use of the data for
improving instruction and student services, including some demonstration of actual changes
made in courses or programs. This should be documented in program reviews.
2. El Camino College has completed a review of all courses. The team was given a sample of
course outlines, and the dates on these outlines were all within the last year. Although they
did not entirely follow the template the institution has adopted, the outlines were substantial-
ly complete. El Camino College has decided to include SLOs as part of the course outline of
record. However, the institution decided not to include either assessment methods or rubrics
on the outlines. The Curriculum Committee considers new and substantially changed courses
during the fall semester and reviews ongoing courses during the spring semester.
The CurricUNET system should enable an easy link between outlines and the SLOs. Inter-
views indicated that this system is useful because it allows the user to see materials produced
at other community colleges. However, there have been some difficulties at the local level
when El Camino CCD Torrance campus and Compton Center faculty attempted to enter data.
This should be resolved so that all data is correctly reported.
ACCJC Standard II 23
3. An examination of course syllabi produced by Compton Center faculty showed that most of
the syllabi contained at least one SLO. Program reviews submitted for the 2011-12 academic
year for the most part contained at least one SLO, assessment data and suggestions for chang-
es to improve the results.
4. The Student Services Division at the Compton Center continues to make progress on docu-
menting SLOs. The review revealed that all programs had assessed their outcomes and were
engaged in dialog about the results.
5. Student Education Plans (SEPs) are now completed for most students and are available on-
line. A report of which students have completed their plan and which are due to be updated
is available, and all counselors use the SEP online system to develop SEPs. The center has
adopted orientation for all students. As a result, the assessment procedure is now being taken
more seriously and many students are asking for assistance in the subject matter prior to tak-
ing an assessment exam.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
24 ACCJC Standard II
ACCJC Standard II-A: Instructional Programs
FCMAT Academic Achievement Standard 3.4 – Instructional Strategies
Professional Standard:
Students are engaged in learning, and they are able to demonstrate and apply their knowledge.
Sources and Documentation:
1. Interviews with division chairs, faculty and administrators
2. Compton Center course syllabi, fall 2012 and spring 2013
3. El Camino College Educational Master Plan, 2010-15
4. Student Success Plan, December 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. Faculty undertake professional development activities to learn effective ways of engaging
students in learning and techniques for having students demonstrate and apply their knowl-
edge. Each Compton Center faculty member was to have created an individual development
plan to be included in the portfolio submitted for the comprehensive evaluation that occurs
every three years. The basic evaluation schedule calls for one-third of the faculty to be evalu-
ated in the fall of each academic year. At the time of the visit, the development of plans had
not progressed during this or the last review periods. The center should restart development
of individual plans and show evidence that the plans are being implemented.
Some funding is available for conference attendance. Attendance at conferences continues to
be an important component of staff development. The Professional Development Committee
allocates funding based on requests from faculty. The committee has identified a goal of cre-
ating a mechanism for faculty, staff and administrators to share what was learned at confer-
ences. This goal should be pursued. The Academic Senate has been asked to form a Faculty
Development Committee to create partnerships for faculty to improve teaching practices. A
needs assessment may be the first undertaking of the committee when it is formed.
2. In the past, emphasis for staff development was placed on training sessions for On Course,
a program for faculty that assists students to be successful in college and in life. In this pro-
gram faculty are given tools to assist students to take ownership for their own success. Most
full-time faculty have completed the training. Each one is now participating with a colleague
from another discipline to create a Faculty Inquiry Partnership Program to develop ways to
use the information in their classrooms. A survey of faculty taken during a previous review
period showed a great increase in the active involvement of students in the classroom, an
increase in active learning on the part of students, an increase in their own confidence to ad-
dress difficult student behavior, and an increase in individual student responsibility for his/
her own learning and success. Several Compton Center faculty members attended the nation-
al conference on On Course in Long Beach. At the previous visit one administrator indicated
that in recent interviews for new faculty, the strongest candidates had completed this training.
This appears to be a highly successful project, and the center should continue the On Course
training, especially for newly hired faculty.
ACCJC Standard II 25
3. The Compton Center continues to be involved in a comprehensive student success initia-
tive. The purpose of the initiative is to develop an integrated approach to the delivery of
classes and services for underprepared students. A team of community college professionals
who possess expertise in the basic skills areas visited the college in May 2009 to evaluate
the efforts in this area. Center personnel visited three community colleges to learn of their
activities. They decided to adopt Long Beach City College’s plan as the foundation for their
own plan. Strategies and objectives have been completed, involved individuals have been
identified, and timelines have been set for completion of the objectives. The objectives are
aligned to the objectives of the California Student Services Task Force (Student Success Act
of 2012). The updated Student Success Plan indicates that the plan is being implemented.
The Student Success Committee continues to be active, and the center is engaged in hiring an
individual who will help coordinate the student success services. In addition, the new instruc-
tional dean (dean of student success) will focus on the implementation of the plan. The center
should continue implementation of the Student Success Plan.
4. The center is continuing the successful First Year Experience project, with four cohorts dur-
ing 2012-13.
5. The center continues to offer supplemental instruction in math and science. Among other ac-
tivities, tutors attend class and meet with students after class to provide assistance.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
26 ACCJC Standard II
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard II: Student Learning Programs and Services
The institution offers high-quality instructional programs, student support services, and library and
learning support services that facilitate and demonstrate the achievement of stated student learning
outcomes. The institution provides an environment that supports learning, enhances student under-
standing and appreciation of diversity and encourages personal and civic responsibility as well as
intellectual, aesthetic, and personal development for all its students.
B. Student Support Services -- The institution recruits and admits diverse students who are
able to benefit from its programs, consistent with its mission. Student support services
address the identified needs of students and enhance a supportive learning environment.
The entire student pathway through the institutional experience is characterized by a
concern for student access, progress, learning, and success. The institution systematically
assesses student support services using student learning outcomes, faculty and staff input,
and other appropriate measures in order to improve the effectiveness of these services.
1. The institution assures the quality of student support services and demonstrates that these
services, regardless of location or means of delivery, support student learning and enhance
achievement of the mission of the institution.
2. The institution provides a catalog for its constituencies with precise, accurate, and current
information concerning the following:
a. General Information
• Official Name, Address(es), Telephone Number(s), and Web Site Address of
the Institution
• Educational Mission
• Course, Program, and Degree Offerings
• Academic Calendar and Program Length
• Academic Freedom Statement
• Available Student Financial Aid
• Available Learning Resources
• Names and Degrees of Administrators and Faculty
• Names of Governing Board Members
b. Requirements
• Admissions
• Student Fees and Other Financial Obligations
• Degree, Certificates, Graduation and Transfer
c. Major Policies Affecting Students
• Academic Regulations, including Academic Honesty
• Nondiscrimination
• Acceptance of Transfer Credits
• Grievance and Complaint Procedures
• Sexual Harassment
• Refund of Fees
d. Locations or publications where other policies may be found
ACCJC Standard II 27
3. The institution researches and identifies the learning support needs of its student population
and provides appropriate services and programs to address those needs.
a. The institution assures equitable access to all of its students by providing appropriate,
comprehensive, and reliable services to students regardless of service location or delivery
method.
b. The institution provides an environment that encourages personal and civic responsibility,
as well as intellectual, aesthetic, and personal development for all of its students.
c. The institution designs, maintains, and evaluates counseling and/or academic advising
programs to support student development and success and prepares faculty and other per-
sonnel responsible for the advising function.
d. The institution designs and maintains appropriate programs, practices, and services that
support and enhance student understanding and appreciation of diversity.
e. The institution regularly evaluates admissions and placement instruments and practices to
validate their effectiveness while minimizing biases.
f. The institution maintains student records permanently, securely, and confidentially, with
provision for secure backup of all files, regardless of the form in which those files are
maintained. The institution publishes and follows established policies for release of stu-
dent records.
4. The institution evaluates student support services to assure their adequacy in meeting identi-
fied student needs. Evaluation of these services provides evidence that they contribute to the
achievement of student learning outcomes. The institution uses the results of these evalua-
tions as the basis for improvement.
28 ACCJC Standard II
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard II: Student
Rating Rating Rating Rating Rating Rating Rating Rating
Learning Programs and Services
B. Student Support Services
Standard to be Addressed
Planning Process - Academic Achievement
Categorical and compensatory program
not not
1.5 funds supplement students in their pursuit 0 1 1
reviewed reviewed
of postsecondary education.
Instructional Strategies - Academic Achievement
Clearly defined student conduct practices
have been established and communicated
3.10 4
among the students, staff, board, and
community.
Class size and faculty assignments
3.11 support effective student learning to 2 5 6 8 8 8 9 9
achieve student learning outcomes.
Faculty members use a variety of
instructional strategies and resources
3.12 that address their students’ diverse needs 1 1 2 5 5 6 7 7
and modify and adjust their instructional
plans appropriately.
Faculty is provided with professional
development on addressing special needs
3.13 of students, language acquisition, timely 1 1 1 5 5 6 6 7
interventions, and culturally responsive
teaching.
The identification and placement of English
language learners into appropriate courses
3.14 3
is conducted in a timely and effective
manner.
Curriculum and instruction for English
language learners prepares these
3.15 students to transition to regular class 2 2 2 4 4 5 5 5
settings and achieve at a high level in all
subjects.
Programs for English language learners
3.16 3
comply with state and federal regulations.
Individual education plans are reviewed
3.18 3
and updated on time.
ACCJC Standard II 29
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard II: Student
Rating Rating Rating Rating Rating Rating Rating Rating
Learning Programs and Services
College counselors are knowledgeable
about individual student academic needs
3.26 3
and work to support postsecondary
education goals.
College students have access to career
3.27 and post-secondary education guidance 3 3 4 5 5 6 6 7
and counseling.
30 ACCJC Standard II
ACCJC Standard II-B: Student Support Services
FCMAT Academic Achievement Standard 3.11 - Instructional Strategies
Professional Standard:
Class size and faculty assignments support effective student learning to achieve student learning
outcomes.
Sources and Documentation:
1. Interviews with administrators and faculty
2. El Camino College Compton Center Course Schedule, fall 2012 and spring 2013
3. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
Progress on Implementing the Recommendations of the Recovery Plan:
1. Management of the class schedule continues to be reviewed and adjusted. Administrators
indicated that the current schedule is very tight and few course sections have been cancelled.
The curriculum is broad-based and there is a reasonable balance between day and evening
classes. Weekend classes have been reduced. The center should continue to closely monitor
the class schedule to ensure that the appropriate classes are offered at the times needed for
students.
2. Compton Center has continued its increased presence in the local high schools and the com-
munity. As called for in the Enrollment Management Plan, the center has implemented com-
prehensive outreach and student recruitment activities that have contributed to its growth.
The plan includes goals for retention and quality improvement. Action steps, identification of
responsible personnel, timelines and resources needed are also included. The center should
monitor the implementation of the Enrollment Management Plan and the effectiveness of re-
lated activities.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 9
April 2013 Rating: 9
Implementation Scale:
ACCJC Standard II 31
ACCJC Standard II-B: Student Support Services
FCMAT Academic Achievement Standard 3.12 - Instructional Strategies
Professional Standard:
Faculty members use a variety of instructional strategies and resources that address their students’
diverse needs and modify and adjust their instructional plans appropriately.
Sources and Documentation:
1. Interviews with faculty and administrators
2. El Camino College Compton Center Course Schedule, fall 2012 and spring 2013
3. Course outlines of record approved by El Camino College
4. Compton Center course syllabi, fall 2012 and spring 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. Each Compton Center faculty member is assigned to create an individual development plan
to be included in the portfolio submitted for the comprehensive evaluation that occurs every
three years for tenured faculty members. At the time of the current visit, the development of
plans had not progressed beyond the previous two visits. The center should continue with de-
velopment of the individual faculty development plans and show evidence that the plans are
being implemented.
The emphasis for staff development has been on training sessions for On Course, a program
for faculty that assists students to be successful in college and in life. In this program faculty
are given tools to assist students to take ownership for their own success. Most full-time fac-
ulty members have completed the training (see additional information in Standard II-A, 3.4).
The center should ensure that new faculty are also trained.
2. The review team examined course syllabi from fall 2012 and spring 2013. In only a few of
the syllabi were diverse teaching methods given. In general, neither course outlines nor syl-
labi demonstrate a commitment to using strategies to meet diverse learning styles. However,
the On Course staff development activities will provide tools for faculty to better meet stu-
dent needs. Course syllabi should, in the future, show several diverse teaching methods (e.g.
lecture, discussion groups and student presentations).
32 ACCJC Standard II
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard II 33
ACCJC Standard II-B: Student Support Services
FCMAT Academic Achievement Standard 3.13 – Instructional Strategies
Professional Standard:
Faculty is provided with professional development on addressing special needs of students, language
acquisition, timely interventions, and culturally responsive teaching.
Sources and Documentation:
1. Interviews with faculty and administrators
2. El Camino College Compton Center Course Schedule, fall 2012 and spring 2013
3. Course outlines of record approved by El Camino College
4. Compton Center course syllabi, fall 2012 and spring 2013
5. Student Success Plan, December 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. See items 1 and 2 in Standard II-B, 3.12.
2. The center is involved in a comprehensive student success initiative. The purpose of the ini-
tiative is to develop an integrated approach to the delivery of classes and services for under-
prepared students. A team of community college professionals who possess expertise in the
basic skills areas visited the college in May 2009 to evaluate the existing efforts in this area.
The report from this group (the Hope Report) has been translated into the Student Success
Plan. See item 3 in Standard II-A, 3.4 for more details. The plan provides support for faculty
to revise the teaching of basic skills. The center should continue to implement the Student
Success Plan. In addition, the Compton Center should demonstrate development plans that
include addressing special needs of students, provide data on faculty attendance or participa-
tion in activities addressing this standard, and show evidence of transfer of knowledge gained
to actual classroom settings.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
34 ACCJC Standard II
ACCJC Standard II-B: Student Support Services
FCMAT Academic Achievement Standard 3.15 – Instructional Strategies –
Curriculum and Instruction of English Learners
Professional Standard:
Curriculum and instruction for English language learners prepares these students to transition to
regular class settings and achieve at a high level in all subjects.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interviews with deans
3. Compton Center course syllabi, fall 2012 and spring 2013
4. Course outlines of record approved by El Camino College
5. El Camino College Compton Center Course Schedule, fall 2012 and spring 2013
6. ARCC 2012 Report, Focus on Results, Compton Center Report (3/31/2012)
Progress on Implementing the Recommendations of the Recovery Plan:
1. An assessment system is not yet in place to provide data necessary to monitor the effective-
ness of curriculum and instruction in preparing English learners for transition to basic skills,
credit, and transfer courses. ESL students are now tagged in the computer system so data
should be available in the future. The faculty keep track of student progress in the non-credit
sequence.
2. Current data do not provide statistics on student progression through a sequence of courses
to determine if coursework prepares students to transition to higher level ESL courses and/
or credit courses. However, some transfer from noncredit ESL to credit ESL is occurring be-
cause some enrollees have completed the full sequence of preparatory noncredit classes. At
present the credit ESL courses at the Compton Center are not full.
3. Compton Center implemented nine noncredit ESL courses designed to prepare students to
make the transition to El Camino College credit ESL courses. The course outlines of record
include SLOs and assessment measures. The program review includes both program and
course SLOs. The curriculum will be analyzed this year during the program review process.
4. A five-year ESL/Basic Skills plan was developed (May 2008), and included as one of its
goals to increase the performance of ESL students as reported in the Accountability Report
for Community Colleges (ARCC). The plan included timelines and assigned responsibility
for actions. The goals of this plan have now been merged with the Student Success Plan.
5. Placement in ESL courses is based on assessment. A diagnostic assessment, Combined Eng-
lish Language Skills Assessment (CELSA), is used for initial placement and Level of English
Proficiency (LOEP) is used to place students in credit courses. There is still concern that stu-
dents are not being given the correct exam. If not, they may be assigned to a lower level than
is appropriate. The center must take measures to ensure that students are properly assessed
for placement in ESL courses.
ACCJC Standard II 35
6. Implementation of the Student Success Plan (see Standard II-B, 3.13) should help to address
issues of retention of ESL students.
7. To fulfill this standard, the center should make data for ESL student progress available and
use it to counsel students and develop/modify programs and curriculum. SLOs should be as-
sessed and the results used to improve instruction.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
36 ACCJC Standard II
ACCJC Standard II-B: Student Support Services
FCMAT Academic Achievement Standard 3.27 – Instructional Strategies – Career
Guidance
Professional Standard:
College students have access to career and postsecondary education guidance and counseling.
Sources and Documentation:
1. Interview with the vice president of Compton Center
2. Interview with the dean of student services
3. Student Service Planning document, December 12, 2012
4. Various student service documents, including program review of CalWORKs, EOPS/Care
plan and evaluation documents
5. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
6. Comprehensive Master Plan, 2012-17
7. Student Service Managers meeting minutes, September 17, 2012 through April 15, 2013
8. Attendance at Student Service Managers meeting
9. Meeting with ASB officers and leaders
Progress on Implementing the Recommendations of the Recovery Plan:
1. Since the previous visit, the center has added one counselor, who transferred from the ESL
faculty. This has helped the workload in counseling, making more of these services available
to students. The center should continue to review the counseling staffing to support students
in career technical programs, especially as new career technical certificates and degrees are
added. The center should continue to train full-time counselors to become career counselors
to students in other vocational programs, as resources and staffing permit.
2. The Compton Center has experienced several major changes in the Student Services area.
The former director of outreach was promoted to the dean of student services in September
2012 and reports to the vice president of the center. The acting dean of student services re-
turned to her position as director of Extended Opportunity Programs and Services (EOPS).
There appear to be full complements of directors in the Student Service area who work well
together on the initiatives outlined in the planning documents.
3. The number of workshops provided to students greatly increased in 2011-12. Topics included
Eureka-The Career Assessment, mock interviews, resume writing, how to get a campus job,
career technical education (CTE), non-traditional careers, careers in the medical field, effec-
tive job searches, internships, how to land a summer job, and how to dress for job interviews.
Workshops for students continue to grow and support students interested in transfer. Students
recently returned from visits to colleges in northern California, which exposed them to addi-
tional educational opportunities as they finish at the Compton Center.
ACCJC Standard II 37
The Compton Center should continue its efforts to create a culture of transfer to help students
see further higher education in their futures. The center provides essential services in these
areas, and the workshop program offered to students is commendable. These should continue,
and consideration should be given to a campus-wide discussion of ways to get the message
regarding transfer options to students in vocational programs. The Career/Transfer Center
staff should continue to work with the career/technical faculty to determine if these programs
could become part of the programs at the center.
4. The collaboration between instruction and student services that the First Year Experience
program involves is an excellent example of collaboration for student retention and success.
During a previous visit, the team reviewed the first cohort of the First Year Experience pro-
gram. At the time, it was an attempt to work on student retention. There were four cohorts of
students involved in the First Year Experience during 2012-13, including a Brother to Brother
cohort that is funded by a grant. The number of male students who drop out is far higher than
the number of females, so special attention is needed for first year male students to improve
their success and retention rates. The First Year Experience program is successful, and the
center should continue to evaluate data for the program participants and continue to improve
the program to serve these students.
5. The review team met with ASB officers and leaders, who indicated satisfaction with their
educational experience at the Compton Center. Some of these students planned to transfer
and some were career/technical certificate students. The students were very satisfied with the
quality of education they were receiving, had high praise for the faculty and student support
staff, and felt they were allowed to grow in their academic experiences and as leaders in stu-
dent government.
A review of the documents in various student service support programs and minutes of the
Student Service Managers meetings support the observation that staff and faculty are com-
mitted to student success. More resources are devoted to the transfer and basic skills counsel-
ing than during the previous review period, and particular career technical programs, includ-
ing nursing, provide these services to their students as well. Programs such as CalWORKs,
Disabled Student Programs and Services (DSPS) and EOPS work with all students who qual-
ify for their programs and provide the guidance necessary to help the students succeed. The
center should ensure that students in career/technical programs get the guidance they need as
they pursue particular certificate programs.
6. A review of several program documents supports improvement in services to students. The
Transfer Center Program Review indicates a substantial increase in transfers to California
State University (CSU), 37 in 2010 and 83 in 2011. However, the University of California
(UC) transfer rates declined from 63 in 2010-11 to 55 in 2011-12. The analysis in the pro-
gram review documents cites the success of the First Year Experience as part of the transfer
improvement rates. Student surveys are part of the evaluation process for the center’s support
programs, and the student satisfaction scores on the surveys are strong.
38 ACCJC Standard II
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard II 39
40 ACCJC Standard II
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard II: Student Learning Programs and Services
The institution offers high-quality instructional programs, student support services, and library and
learning support services that facilitate and demonstrate the achievement of stated student learning
outcomes. The institution provides an environment that supports learning, enhances student under-
standing and appreciation of diversity and encourages personal and civic responsibility as well as
intellectual, aesthetic, and personal development for all its students.
C. Library and Learning Support Services -- Library and other learning support services
for students are sufficient to support the institution’s instructional programs and
intellectual, aesthetic, and cultural activities in whatever format and wherever they
are offered. Such services include library services and collections, tutoring, learning
centers, computer laboratories, and learning technology development and training. The
institution provides access and training to students so that library and other learning
support services may be used effectively and efficiently. The institution systematically
assesses these services using student learning outcomes, faculty input, and other appro-
priate measures in order to improve the effectiveness of the services.
1. The institution supports the quality of its instructional programs by providing library and
other learning support services that are sufficient in quantity, currency, depth, and variety to
facilitate educational offerings, regardless of location or means of delivery.
a. Relying on appropriate expertise of faculty, including librarians and other learning sup-
port services professionals, the institution selects and maintains educational equipment
and materials to support student learning and enhance the achievement of the mission of
the institution.
b. The institution provides ongoing instruction for users of library and other learning support
services so that students are able to develop skills in information competency.
c. The institution provides students and personnel responsible for student learning programs
and services adequate access to the library and other learning support services, regardless
of their location or means of delivery.
d. The institution provides effective maintenance and security for its library and other learn-
ing support services.
e. When the institution relies on or collaborates with other institutions or other sources for
library and other learning support services for its instructional programs, it documents
that formal agreements exist and that such resources and services are adequate for the
institution’s intended purposes, are easily accessible, and utilized. The performance of
these services is evaluated on a regular basis. The institution takes responsibility for and
assures the reliability of all services provided either directly or through contractual ar-
rangement.
2. The institution evaluates library and other learning support services to assure their adequacy
in meeting identified student needs. Evaluation of these services provides evidence that they
contribute to the achievement of student learning outcomes. The institution uses the results
of these evaluations as the basis for improvement.
ACCJC Standard II 41
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard II: Student
Rating Rating Rating Rating Rating Rating Rating Rating
Learning Programs and Services
C. Library and Learning Support Services
Standard to be Addressed
Learning Support Services - Academic Achievement
The college selects and maintains
appropriate, current, and sufficient
6.1 3 4 4 5 6 6 7 6
educational equipment and materials to
support student learning.
Students have access to college library
services and collections, learning centers,
6.2 and computer laboratories, and receive 1
training to competently utilize the college’s
informational systems.
Students may access the college’s
6.3 informational systems from off-site 2
locations.
The college provides effective maintenance
6.4 and security for its library, laboratories and 5
informational systems.
The college periodically evaluates the
library and learning support services
6.5 provided to students and makes 1 3 3 5 5 6 6 7
necessary improvement to ensure their
adequacy in meeting student needs.
42 ACCJC Standard II
ACCJC Standard II-C: Library and Learning Support Services
FCMAT Academic Achievement Standard 6.1 – Learning Support Services –
Equipment and Materials
Professional Standard:
The college selects and maintains appropriate, current, and sufficient educational equipment and
materials to support student learning.
Sources and Documentation:
1. Interviews with the Compton Center librarian and library staff
2. Interviews with two academic deans
3. Interview with the vice president of Compton Center
4. Technology Plan, 2011-16
5. Learning Resources Program SLOs, 2012-13
6. El Camino College Educational Master Plan, 2010-15
7. Comprehensive Master Plan, 2012-17
8. Meeting with ASB officers and leaders
Progress on Implementing the Recommendations of the Recovery Plan:
1. The technology plan that the team reviewed during a prior visit was revised to cover 2011-
16. Interviews indicated that the plan was submitted to the Planning and Budget Committee
during this review period. There are plans for a 2014-19 Technology Plan that will tie to the
master planning effort.
To meet this standard, the Compton Center should develop its new Technology Plan and tie it
to the Comprehensive Master Plan and the Educational Master Plan, where appropriate. The
plan should be reviewed and evaluated annually.
2. The Technology Committee reports to the dean of the career/technical area. The process for
assessing technology needs is for each area to have an advisory committee. That group re-
views the courses in their programs and determines if the existing technology is current and
if equipment is needed. If the advisory committee determines that additional equipment or
different equipment is needed, the area reviews the advisory committee’s recommendations
and may then include them in its Plan Builder. This is the process for tying the equipment
plans to budgets. The individual areas prioritize equipment needs with other needs in the Plan
Builder, which then reflects the budget priority in that area. All career/technical faculty and
staff are expected to follow this process. Interviews indicated that each of the trades has an
advisory committee. The technology areas have limited discussions. All, however, do use the
Plan Builder for requesting equipment. In fall 2012, the dean had planned to create a new
team (composed of administrators, IT staff from the El Camino CCD Torrance campus and
the Compton Center, CIS faculty and MIS support staff) to continue the planning function.
This has not yet occurred.
ACCJC Standard II 43
The center should retain the Technology Committee and include members that can provide
broad-based planning for technology and monitor the Technology Plan. The center should
insist that all areas meet to discuss their needs and prioritize them according to the estab-
lished process. It is critical that all discipline colleagues have broad discussions about needs
because this will also impact the learning outcomes and assessment activities.
3. The Compton Center is involved in some major building projects, all of which will provide
stronger learning opportunities for students through improved technology. The campus row
buildings, which underwent necessary upgrades to make them effective classroom learning
environments in 2012, will have state of the art equipment and technological resources for
students. Some of the improvements have already occurred and others are in the planning
stages. A meeting with ASB officers and leaders indicated that some of the older facilities
needed upgrading, but the students acknowledged that all the buildings on campus will be
improved through the bond project and understand that significant improvements in the learn-
ing environment are under way.
4. Student labs continue to receive more use, and the center has responded by increasing open
hours of labs. Instructional associates/aides inform students of the opportunities to use tech-
nology. Faculty members encourage students to take advantage of the labs for their courses.
Interviews indicated that the two wireless labs are full all the time. The instructional associates/
aides log students in and indicate the areas of lab use, which allows the center to evaluate use
and develop ways to meet the underserved areas. Increased use is occurring in all the lab areas,
including tutoring, math/computer and science. The center should continue to monitor usage in
the labs and use the information to evaluate and support student need and demand.
5. The center is moving in the right direction with the support services it provides to students
for their academic programs. Attention to student use will support a meaningful evaluation of
the center’s materials and equipment. The center needs to complete plans and initiatives from
previous years that focused on technology use by students or explain why the plans are no
longer needed or valid.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 6
Implementation Scale:
44 ACCJC Standard II
ACCJC Standard II-C: Library and Learning Support Services
FCMAT Standard 6.5 Learning Support Services—Library Evaluation
Professional Standard:
The college periodically evaluates the library and learning support services provided to students and
makes necessary improvements to ensure their adequacy in meeting student needs.
Sources and Documentation:
1. Interviews with the Compton Center librarian and library staff
2. Interview with the vice president of Compton Center
3. Interviews with faculty chairs
4. Interviews with the two academic deans
5. Library holdings list
Progress on Implementing the Recommendations of the Recovery Plan:
1. The new LRC has not opened on schedule because of construction/design flaws. During the
last visit, the estimated opening date was fall 2013; the current estimated date is spring 2014.
Interviews indicated that of the 160 items on the punch list, only 60 remain. Weekly meetings
are conducted with the appropriate parties to discuss the LRC and make decisions. The center
continues to provide library services through the existing temporary library.
2. Despite the inability to use the new facility and challenging budget issues, the library con-
tinues to provide resources to students to support learning activities. There are over 338,000
full text journals available in EBSCO databases. The library houses 30,732 books including
reference books. The library also added $10,476 of new nursing books in the last two years.
The library staff encourages faculty to participate in the selection of new titles and to assist in
removing dated material from the collection. Library staff indicated that collegial consulta-
tion with the faculty is occurring.
3. During previous visits, the review team recommended that the center provide a more formal-
ized process for faculty to have input into acquisition and deletion of library materials in their
discipline, such as a Library Advisory Committee composed of representative discipline fac-
ulty. The center has been working on this and a meeting was held on April 26, 2012 that was
well attended by faculty willing to participate in the library activities, including an advisory
committee. The committee has been working for almost a year and holds at least two meet-
ings a semester. Because state TTIP funding was discontinued a couple of years ago, the cen-
ter augmented the library’s budget to purchase databases. The state then agreed to purchase
databases for consortium libraries and the Compton Center now uses that source for acquir-
ing new material. To meet this standard, the committee should continue to meet regularly and
revise policies as needed. The center should evaluate the effectiveness of the advisory com-
mittee.
4. The LRC began a supplemental instruction program in fall 2009. The program was discon-
tinued in spring 2010 but was reinstated in fall 2010 and continues. Increased numbers of
students are using the LRC and taking advantage of tutoring services and open labs. This is
ACCJC Standard II 45
a welcome sign for increased student success in classes. The center should continue to co-
ordinate with other Compton Center computer labs, learning centers, tutoring services and
basic skills offerings to provide seamless and expanded offerings to meet student need and
demand.
5. The library has been able to expand its staff, which has provided improved service to stu-
dents. The director of library services is no longer doing double duty, and having three full-
time academic librarians has provided better service to students and allowed for more hours
of operation. The library budget has improved, which has allowed for stronger short- and
long-range planning. The relationship between the libraries at both campuses continues to be
collaborative, and the director of library services at the center is serving on the hiring com-
mittee for the new librarian at the El Camino CCD Torrance campus.
6. The library continues to provide additional services to the center. For example, because re-
sources aren’t available to purchase best sellers, the library rents them. The library also pro-
vides a textbook service for students by placing copies on reserve, and welcomes and reviews
student suggestions. Students have access to online databases, ebooks and other resources.
With the hiring of a new systems librarian, improvements in this area are occurring. The cen-
ter should continue to plan for the support materials and equipment necessary to enhance and
support student learning, and should tie the plan to budget.
7. During the previous review periods, the team recommended that the Compton Center de-
velop/reinstate policies and procedures, for example: collection development, public service
and outreach to faculty and students. The center is now using policies developed by the El
Camino CCD for the Torrance campus. The Library Advisory Committee should revise these
policies as needed to reflect the specific needs of the center.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
46 ACCJC Standard II
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard III: Resources
The institution effectively uses its human, physical, technology, and financial resources to achieve its
broad educational purposes, including stated student learning outcomes, and to improve institutional
effectiveness.
B. Physical Resources – Physical resources, which include facilities, equipment, land, and other
assets, support student learning programs and services and improve institutional effective-
ness. Physical resource planning is integrated with institutional planning.
1. The institution provides safe and sufficient physical resources that support and assure the
integrity and quality of its programs and services, regardless of location or means of delivery.
a. The institution plans, builds, maintains, and upgrades or replaces its physical
resources in a manner that assures effective utilization and the continuing quality
necessary to support its programs and services
b. The institution assures that physical resources at all locations where it offers
courses, programs, and services are constructed and maintained to assure access,
safety, security, and a healthful learning and working environment.
2. To assure the feasibility and effectiveness of physical resources in supporting institutional
programs and services, the institution plans and evaluates its facilities and equipment on a
regular basis, taking utilization and other relevant data into account.
a. Long-range capital plans support institutional improvement goals and reflect
projections of the total cost of ownership of new facilities and equipment.
b. Physical resource planning is integrated with institutional planning. The
institution systematically assesses the effective use of physical resources and uses
the results of the evaluation as the basis for improvement.
ACCJC Standard III 1
2 ACCJC Standard III
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
B. Physical Resources
Standard to be Addressed
Facilities Management – School Safety
The college has developed a plan of se-
curity that includes adequate measures of
1.3 6
safety and protection of people and prop-
erty. [EC 32020]
The college ensures that the custodial and
maintenance staff is regularly informed of
restrictions pertaining to the storage and
1.4 3 3 3 4 4 5 5 5
disposal of flammable or toxic materials.
[F&AC 12981, H&SC 25163, 25500-25520,
LC 6360-6363, CCR Title 8 §5194]
The college has a documented process for
issuing master and sub-master keys. A
1.5 collegewide standardized process for the 3 3 4 7 7 7 5 6
issuance of keys to employees is followed
by all college administrators.
Outside lighting is properly placed and
monitored on a regular basis to ensure
the operability/adequacy of such lighting
and to ensure safety while activities are
in progress in the evening hours. Outside
1.7 lighting provides sufficient illumination 2 2 3 5 6 6 6 7
to allow for the safe passage of students
and the public during after-hours ac-
tivities. Lighting also provides security
personnel with sufficient illumination to
observe any illegal activities on campus.
Each public agency is required to have on
file written plans describing procedures
1.9 6
to be employed in case of emergency. [EC
32001, GC 3100, 8607, CCR Title 8 §3220]
Maintenance/custodial personnel have
knowledge of chemical compounds used
in school programs that include the
1.11 4 4 4 4 4 5 4 4
potential hazards and shelf life. [F&AC
12981, H&SC 25163, 25500-25520, LC
6360-6363, CCR Title 8 §5194]
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 3
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Building examinations are performed,
and required actions are taken by the
1.12 5 5 6 6 6 5 4 4
Governing Board upon report of unsafe
conditions. [EC 81162]
Sanitary, neat and clean conditions of the
school premises exist and the premises
1.14 2 2 3 6 7 6 6 4
are free from conditions that would cre-
ate a fire hazard. [CCR Title 5 §633]
The Injury and Illness Prevention Pro-
gram (IIPP) requires periodic inspec-
1.15 2 2 2 5 5 5 3 3
tions of facilities to identify conditions.
[CCR Title 8 §3203]
Appropriate fire extinguishers exist in each
1.16 building and current inspection information 6
is available. [CCR Title 8 §6151]
All exits are free of obstructions. [CCR
1.17 7
Title 8 §3215]
A comprehensive school safety plan ex-
1.18 ists for the prevention of campus crime 5 5 5 6 7 8 8 8
and violence. [EC 66300]
Requirements are followed pertaining to
1.19 underground storage tanks. [H&SC 25292, 7
Title 23 Chapter 16]
All asbestos inspection and asbestos work
completed is performed by Asbestos Haz-
1.20 ard Emergency Response Act (AHERA) 6
accredited individuals. [EC 49410.5, 15
USC 2641 et seq., 40 CFR part 763]
All playground equipment (at the Child
Development Center) meets safety code
1.21 regulations and is inspected in a timely 8
fashion as to ensure the safety of the stu-
dents. [H&SC 115725-115750, PRC 5411]
Safe work practices exist with regard to
1.22 boiler and fired pressure vessels. [CCR 4 4 4 7 8 8 8 4
Title 8 §782]
The college maintains Materials Safety
1.23 Data Sheets. [LC 6360 et seq., CCR Title 8 6
§5194]
The standards in bold text are the identified subset of standards for ongoing reviews.
4 ACCJC Standard III
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The college maintains a comprehensive
employee safety program. Employees are
made aware of the college safety program,
1.24 0 0 0 5 4 5 6 5
and the college provides in-service train-
ing to employees on the requirements of
the safety program.
The college conducts periodic first aid
1.25 0 0 0 4 5 5 3 4
training for employees.
Facilities Management – Facility Planning
The college has a long-range facilities
2.1 5
master plan.
The college possesses a Facilities Plan-
2.2 ning Manual for the California Commu- 0 0 0 8 10 10 10 10
nity Colleges.
2.3 The college seeks state and local funds. 6 6 7 10 10 10 10 10
The college has a district-wide Facility Plan-
2.4 5
ning Committee in place.
The college has a properly staffed and
2.5 0 0 1 8 8 8 8 7
funded facility planning department.
The college has developed and implement-
2.6 5 5 6 7 8 8 9 8
ed an annual capital planning budget.
The college has standards for real prop-
2.7 erty acquisition and disposal. [EC 39006, 8
17230-17233]
The college has established and utilizes
a selection process for the selection of
2.9 5
licensed architectural/engineering services.
[GC 4526]
The college assesses its local bonding
2.10 4 4 4 8 9 10 9 8
capacity. [EC 15100]
The college has developed a process to
2.11 4 4 4 8 9 10 9 8
determine debt capacity.
The college is aware of and monitors the
2.12 assessed valuation of taxable property 4 4 4 8 9 10 10 10
within its boundaries.
The college has developed an asset man-
2.14 5
agement plan.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 5
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The college has established and utilizes
2.16 an organized methodology of prioritizing 2 2 3 7 8 8 7 8
and scheduling projects.
A college that has passed a general obliga-
tion bond has created a Citizens Oversight
2.19 Committee to ensure the appropriateness of 6
expenditures related to the passage of the
college’s local school bond measure.
Facilities Management – Facilities Improvement and Modernization
The college has a restricted capital out-
lay fund, and a portion of those funds is
3.1 1 1 2 8 8 9 8 6
expended for maintenance and special
repairs only. [EC84660]
The college maintains a plan for the
3.4 maintenance and modernization of its 1 1 2 8 8 8 8 8
facilities. [EC 84660, 84670-84674]
The college has established and main-
3.6 tains a system for tracking the progress 2 2 3 6 7 8 8 9
of individual projects.
Furniture and equipment items are
3.7 routinely included within the scope of 2 2 2 6 7 8 7 7
modernization projects.
Refurbishing, modernization, and new
3.8 construction projects take into account 1 1 2 7 8 8 7 8
technology infrastructure needs.
The college obtains approval of plans and
specifications from the Division of the State
3.9 Architect prior to the award of a contract to 8
the lowest responsible bidder. [EC 81052,
81130 et seq.]
All relocatables in use throughout the
3.10 college meet statutory requirements. [EC 8
81130, 81160]
College staff are knowledgeable of proce-
3.13 dures in the Division of the State Archi- 1 2 2 8 8 8 7 7
tect (DSA).
The standards in bold text are the identified subset of standards for ongoing reviews.
6 ACCJC Standard III
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Facilities Management – Construction of Projects
The college maintains an appropriate
4.1 structure for the effective management 1 1 1 6 6 7 6 7
of its construction projects.
Change orders are processed and receive
prior approval from required parties before
4.2 6
being implemented within respective con-
struction projects.
The college maintains appropriate project
4.3 1 1 1 8 8 8 8 8
records and drawings.
Each Inspector of Record (IOR) assignment
4.4 10
is properly approved.
Facilities Management – Compliance with Public Contracting Laws and Procedures
The college complies with formal bidding
5.1 8
procedures. [GC 54202, 54204, PCC 20111]
The college has a procedure for requests for
5.2 quotes/proposals. [GC 54202, 54204, PCC 7
20111]
The college maintains files of conflict of
interest statements and complies with
5.3 legal requirements. Conflict of interest 4 4 4 4 7 7 7 7
statements are collected annually by the
President/Superintendent and kept on file.
The college ensures that the biddable plans
and specifications are developed through its
5.4 6
licensed architects/engineers for respective
construction projects.
The college ensures that requests for prog-
5.5 10
ress payments are carefully evaluated.
The college maintains contract award/appeal
5.6 7
processes. [GC 54202, 54204, PCC 20111]
The college maintains internal control,
security, and confidentiality over the bid
5.7 7
submission and award processes. [GC
54202, 54204, PCC 20111]
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 7
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Facilities Management – Facilities Maintenance and Custodial
An energy conservation policy has been
8.1 approved by the Board of Education and 0 0 0 3 6 7 7 7
implemented throughout the college.
Cost-effective, energy-efficient design
8.3 has been made a top priority for all col- 1 1 1 5 8 8 8 9
lege construction projects.
Adequate maintenance records and
reports are kept, including a complete
inventory of supplies, materials, tools
and equipment. All employees required
to perform maintenance on the college
sites are provided with adequate sup-
8.5 1 1 2 5 5 5 5 6
plies, equipment and training to per-
form maintenance tasks in a timely and
professional manner. Included in the
training is how to inventory supplies and
equipment and when to order or replen-
ish them.
Procedures are in place for evaluating
the work quality of maintenance and
operations staff. The quality of the work
performed by the maintenance and
8.6 0 0 1 3 6 6 6 7
operations staff is evaluated on a regular
basis using a board-adopted procedure
that delineates the areas of evaluation
and the types of work to be evaluated.
Major areas of custodial and mainte-
nance responsibilities, and specific jobs
to be performed, have been identified.
Custodial and maintenance personnel
8.7 2 2 3 5 7 7 7 8
have written job descriptions that delin-
eate the major areas of responsibilities
they will be expected to perform and on
which they will be evaluated.
Necessary staff, supplies, tools and equip-
ment for the proper care and cleaning of
the college are available. To meet expec-
tations, the college is adequately staffed,
8.8 4 4 4 5 5 7 7 7
and staff is provided with the necessary
supplies, tools and equipment as well as
the training associated with the proper
use of such.
The standards in bold text are the identified subset of standards for ongoing reviews.
8 ACCJC Standard III
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The college has an effective preventive
maintenance program that is scheduled
and followed by the maintenance staff.
8.9 0 0 0 5 5 5 6 6
This program includes verification of
completion of work by the supervisor of
the maintenance staff.
The Governing Board of the college
provides clean and operable flush toilets
for use of students. Toilet facilities are
8.10 3 3 3 6 6 5 5 4
adequate and maintained. All buildings
and grounds are maintained. [CCR Title
5 631, CCR Title 5 14030, EC 17576]
The college has implemented a planned
program maintenance system that in-
cludes an inventory of all facilities and
equipment that will require maintenance
8.11 and replacement. Data includes purchase 0 0 0 6 7 7 7 8
prices, anticipated life expectancies,
anticipated replacement time lines, and
budgetary resources necessary to main-
tain the facilities.
The college has a documented process for
8.12 assigning routine repair work orders on a 3 3 4 6 6 7 7 8
priority basis.
Facilities Management – Instructional Program Issues
The college has developed a plan for at-
9.1 4 4 4 4 7 7 7 7
tractively landscaped facilities.
The Governing Board of any college
maintains all of the campuses established
by it with equal rights and privileges as far code code
9.3 as possible. [EC 35293] The college has 3 3 4 section section
developed and maintains a plan to ensure N/A N/A
equality and equity of its facilities through-
out the college.
The college has adequate lighting, electri-
9.4 7
cal service, heating and ventilation.
Classrooms are free of noise and other bar-
9.5 7
riers to instruction. [EC 32212]
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 9
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The learning environments provided within
9.6 the college are conducive to high quality 8
teaching and learning.
Facilities Management – Community Use of Facilities
Education Code Section 82537 establish-
es terms and conditions of school facility
use by community organizations, in the
10.2 process requiring establishment of both 5 5 5 8 8 8 8 9
“direct cost” and “fair market” rental
rates, specifying what groups have which
priorities and fee schedules.
The college maintains comprehensive
10.3 records and controls on civic center imple- 6
mentation and cash management.
Facilities Management – Communication
The college’s public information office
coordinates a full appraisal to students,
11.1 staff and community of the condition of the
college’s facilities and of efforts to rectify
any substandard conditions.
The college provides clear and comprehen-
11.2 sive communication to staff of its facilities
plans.
The standards in bold text are the identified subset of standards for ongoing reviews.
10 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.4 - School Safety - Restrictions on
Flammable and Toxic Materials
Legal Standard:
The college ensures that the custodial and maintenance staff is regularly informed of restrictions
pertaining to the storage and disposal of flammable or toxic materials. [F&AC 12981, H&SC 25163,
25500-25520, LC 6360-6363, CCR Title 8 §5194]
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interviews with maintenance and operations supervisors
3. Board Policy 8500, Illness and Injury Prevention, November 17, 2009
4. Administrative Regulation 8503, Hazardous Material Communication Program, March 15,
2010
5. Hazardous Materials Business Plan, July 2010
6. Material Safety Data Sheets (MSDS) samples
7. Workplace Security Plan, 2011
8. Consolidated Contingency Plan, May 14, 2011
9. Employee Safety Training schedule, 2011-12
10. Memo regarding MSDS binders, April 8, 2013
11. Injury and Illness Prevention Program (IIPP), December 4, 2012
12. MSDS training sign-in sheet, March 26, 2013
13. Routine Maintenance Procedures - Cleaning
14. SWACC (Statewide Association of Community Colleges) property and liability inspection
follow-up audit performed by Keenan & Associates, October 2012
15. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district completed a Consolidated Contingency Plan in May 2011. The plan template is
provided by Los Angeles County to give organizations a format to comply with the emer-
gency planning requirements of three hazardous materials emergency response plans required
in California: Hazardous Materials Business Plan, Hazardous Waste Generator Contingency
Plan, and the Underground Storage Tank Emergency Response Plan and Monitoring Pro-
gram. This plan is relied on to meet storage and usage quantities required by California state
laws and regulations by the county of Los Angeles Certified Unified Programs Agency. The
plan identifies contact information including response and medical treatment facilities in
case of an emergency. The plan identifies the Workplace Security Plan as the document used
to coordinate evacuation. The plan also includes procedures for prevention, mitigation, and
abatement of hazards, and lists emergency equipment to be available and employee training
to be provided.
The Consolidated Contingency Plan has not been updated since May 2011 and contains out-
dated information regarding staff responsible to authorize necessary work and emergency
contact information.
ACCJC Standard III 11
2. The Workplace Security Plan includes a communications system that is designed to encour-
age continuous flow of safety, health, and security information between management and
employees. The plan states the district will perform periodic inspections designed to identify
hazards, provide for freedom of movement and access, and ensure emergency contact infor-
mation is current and posted.
3. A sign-in sheet indicates that nine employees were trained on MSDS on March 26, 2013.
4. A hazardous chemical inventory was last prepared at the end of the 2009-10 fiscal year to
document the existence of all chemicals located on the campus. FCMAT requested but was
not provided with documentation to support subsequent inventory updates or a notification
process regarding when new or additional chemicals are received on site. A current and thor-
ough campuswide chemical inventory is critical to identify and prepare for potential exposure
issues for students and faculty.
5. The SWACC follow-up audit performed by Keenan stated that issues still exist with outdated
chemicals in the Building C chemistry lab that should be removed for proper disposal. Prog-
ress was made in removing hazardous materials from the storage yard, but a new finding was
made with regard to the storage of flammable goods and containers.
6. An April 2013 memo to staff regarding MSDS binders for each custodial closet indicated
that binders will be secured in the closet and contain MSDS information. The memo further
indicated that supervisors will discuss MSDS as part of their safety meetings and will update
binders as needed.
7. The cleaning schedules provided to the review team list the requirement to have MSDS avail-
able on the work site. Interviews and observations confirmed recent communication to staff
regarding this requirement.
8. The IIPP, updated in December 2012, contains a hazardous materials and protection checklist
for use in inspecting laboratories and facilities. Included in the program are scheduled and
unscheduled inspections and a form to complete and submit if hazards are found. The form is
outdated because it lists the previous director of facilities as the person who is to review and
take action on the reported hazards.
9. A review of the district’s board policies indicated that no updates have been made to policies
applicable to this standard since the last review period.
12 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 13
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.5 - School Safety - Documented Process
for Key Control
Professional Standard:
The college has a documented process for issuing master and sub-master keys. A collegewide stan-
dardized process for the issuance of keys to employees is followed by all college administrators.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the police lieutenant
3. Board Policy 3330, Access to Facilities and Property, February 16, 2010
4. Administrative Regulation 3331, Key Issuance and Return, March 16, 2010
5. Key Control Procedures
6. El Camino College Compton Center Campus Police Campus Security Report, 2009-11
7. Key Distribution Process diagram
8. Property and Equipment Release form sample
9. Lend Lease Request for Information (RFI), December 4, 2012
10. Compton Community College District Facilities Master Plan Update, July 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton CCD’s Facilities Master Plan continues to include plans and techniques to pro-
vide electronic security throughout the campus. Components include door position switches,
motion detectors, and door controllers through a master server to audit and control access to
campus buildings.
2. Rekeying had been incorporated in the district’s master plan, including the plan to rekey cam-
pus buildings with programmable key cards. However, FCMAT requested but was not pro-
vided evidence indicating that progress had been made in this area during this review period.
3. While campus breaches are reported not to be a significant issue, the campus police depart-
ment advocates a new electronic programmable access card system that would allow greater
control of building access. Each staff member would have his or her own unique key card
that would be assigned by employee number and designate which buildings they could ac-
cess. In addition, the system would provide greater protection from both external and internal
threats and limit access to what each staff member needs. Campus security would also be
greatly enhanced with a programmable access system that logs all entry and egress data.
4. The key issuance process provides guidelines and procedures for the issuance and control
of keys and all forms of access to a door(s), buildings, cabinets, equipment, or vehicles to
ensure the security of all district facilities and property. Interviews indicated that the campus
police control the disbursement of all keys for facilities and ensure the return of keys upon
employee exit from employment; however, the department does not have a current inventory
of all keys.
14 ACCJC Standard III
5. The security report states that “keys are provided to staff members on a need-to-enter basis as
determined by the appropriate manager. Lost or stolen keys must be reported immediately to
Campus Police and the employee’s manager or supervisor. Keys may not be loaned to other
staff members, family, friends, or to students. Campus Police will confiscate any keys that
have not been specifically issued to a particular individual. Unauthorized duplication and il-
legal possession of keys is a misdemeanor.”
6. The district does not maintain strict control of lock cores or key stock. Because of this lack of
control, keys may be made and distributed outside of the procedures and without the knowl-
edge of the police.
7. The district provided a sample completed Property and Equipment Release form that indi-
cated the signed acceptance of district keys by an employee.
8. Interviews indicated that the district is moving toward key standardization with the ASSA®
key system and will be updating board policy to reflect this commitment.
9. The district’s construction management consultant, Lend Lease, submitted an RFI to the dis-
trict that indicates the current Sargent Keso key system is not compatible with the requested
ASSA® key system. The district responded with approval for the ASSA® key system for the
central plant project. As a result, the building will have a system that, while of higher secu-
rity, will not be standardized with the existing system.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 4
June 2009 Rating: 7
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard III 15
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.7 - School Safety - Installation and
Operation of Outside Security Lighting
Professional Standard:
Outside lighting is properly placed and monitored on a regular basis to ensure the operability/adequa-
cy of such lighting and to ensure safety while activities are in progress in the evening hours. Out-
side lighting provides sufficient illumination to allow for the safe passage of students and the public
during after-hours activities. Lighting also provides security personnel with sufficient illumination to
observe any illegal activities on campus.
Sources and Documentation:
1. Interviews with the interim director of facilities planning and operations and campus police
2. Campus Lighting Plan, undated
3. Compton Community College District Facilities Master Plan Update, July 2012
4. Compton Community College District Exterior Lighting Project 2010, by area, draft dated
May 12, 2010
5. Health and Safety Committee meeting agendas
6. Map of temporary lighting on campus
7. Email communications within district and with campus police regarding lighting, March
2013
8. Purchase order to rent four light towers to provide temporary lighting on campus
9. El Camino College Compton Center Campus Police Campus Security Report, 2009-11
10. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has established a routine schedule for checking lighting throughout the campus.
The maintenance and operations staff and the campus police department routinely inspect
campus lighting conditions. Regular observations contribute to the timely repair of inopera-
tive lighting and the installation of additional lighting where a need has been determined. The
survey completed by Southland Industries, with an initial report in 2008, stated that much of
the campus had deficient or aged wiring and fixtures. The Compton CCD Exterior Lighting
Project 2010 identifies 18 locations where new lighting fixtures will be placed, or have al-
ready been installed or replaced by the maintenance and operations staff.
2. The Facilities Master Plan dated July 2012 identifies lighting design goals and includes ex-
isting conditions and the proposed solutions for the entire campus. The plan includes entry
points to the campus, parking areas, pedestrian pathways and stadium lighting.
3. Lighting is listed as a standing agenda item for most Health and Safety Committee meetings.
Committee concerns and updates are discussed during these meetings.
4. Temporary lighting has been placed in 14 locations throughout the campus and is expected to
remain until replaced by permanent lighting as identified in the Facilities Master Plan.
16 ACCJC Standard III
5. Staff have been assigned to turn temporary lights on and off and to keep them serviced and
functioning.
6. The campus security report states that lighting has been improved and the maintenance de-
partment responds to and resolves lighting issues in a timely manner.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 17
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.11 - School Safety - Knowledge of
Chemicals and Potential Hazards
Legal Standard:
Maintenance/custodial personnel have knowledge of chemical compounds used in school programs
that include the potential hazards and shelf life. [F&AC 12981, H&SC 25163, 25500-25520, LC 6360-
6363, CCR Title 8 §5194]
Sources and Documentation:
1. Administrative Regulation 8503, Hazardous Material Communication Program, March 15,
2010
2. Hazardous Materials Business Plan, May 2011
3. Custodial and Maintenance Procedures Manual
4. Consolidated Contingency Plan, May 14, 2011
5. Memo regarding MSDS binders, April 8, 2013
6. Injury and Illness Prevention Program, December 4, 2012
7. MSDS training sign-in sheet, March 26, 2013
8. Routine Maintenance Procedures – Cleaning
9. SWACC property and liability inspection follow-up audit performed by Keenan &
Associates, October 2012
10. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. Administrative Regulation 8503, Hazardous Material Communication Program, was ap-
proved March 15, 2010. Keenan & Associates conducted initial manager training for the IIPP
program in June 2010 as a precursor to the campuswide introduction of the injury and illness
prevention program.
2. A formal process for faculty to update the chemical inventory annually still has not been
developed. A chemical inventory was prepared at the end of the 2009-10 fiscal year to docu-
ment the existence of all chemicals located on the campus. Interviews indicated an informal
process is in place that requires the lab technician to notify the interim director of facilities
planning and operations of all such purchases upon receipt; however, FCMAT requested but
was not provided with documentation to support this process. An up-to-date and thorough
campuswide chemical inventory is essential to identify and prepare for potential exposure is-
sues for students and faculty.
3. The district developed a Consolidated Contingency Plan in 2011 that included emergency
contact information in case of a local emergency and identified the following plans for haz-
ardous materials:
18 ACCJC Standard III
Prevention
• Lab tech training and awareness for the handling, transporting and storage of hazardous
materials.
• Knowledge of Material Safety Data Sheets (MSDS).
• Implementation of IIPP – hazard identification, scheduled safety and inspections.
• Implementation of IIPP – hazard correction.
• General safety “tailgate” meeting, safety topics on personal protective equipment (PPE)
and other related topics.
Mitigation
• Safety awareness training to report any unsafe or hazardous condition as a priority one for
mitigation.
• Quarterly inspections of facility grounds and storage areas.
Abatement
• General training on personal safety through PPE, containment and abatement if material is
non-harmful.
• Emergency spills – Call Compton Fire Department for abatement (911).
• If planned abatement, contract with lowest-cost qualified vendor to provide services, certi-
fications and waste tickets for disposal.
The plan included an equipment inventory but has not been updated to indicate the location
or description information as required by 22 CCR 66265.52.
The plan also specified initial and annual employee training to include: familiarity with all
plans and procedures specified in the Consolidated Contingency Plan, methods for safe han-
dling of hazardous materials, safety procedures in the event of a release or threatened release
of a hazardous material, use of emergency response equipment and supplies under their con-
trol, procedures for coordination with local emergency response organizations, and hazardous
waste generator training.
There is no evidence that all employee training has occurred as outlined in the plan. Only
MSDS training was provided to some employees during this review period. The plan has not
been updated since May 2011 and contains outdated information regarding staff responsible
to authorize necessary work and emergency contact information.
4. An April 2013 memo to staff regarding MSDS binders for each custodial closet indicated
that binders will be secured in the closet and contain MSDS information. The memo further
indicated that supervisors will discuss MSDS as part of their safety meetings and will update
binders as needed.
5. The IIPP, updated in December 2012, contains a hazardous materials and protection checklist
for use in inspecting laboratories and facilities. Included in the program are scheduled and
unscheduled inspections and a form to complete and submit if hazards are identified. The
form is outdated because it lists the previous director of facilities as the person who is to re-
ACCJC Standard III 19
view and take action on the reported hazards. No inspections have been completed since the
IIPP was updated.
6. A sign-in sheet indicates that nine employees were trained on MSDS on March 26, 2013.
7. The SWACC follow-up audit performed by Keenan stated that issues still exist with outdated
chemicals in the Building C chemistry lab that should be removed for proper disposal. Prog-
ress was made with removal of hazardous materials from the storage yard, but a new finding
was made with regard to the storage of flammable goods and containers.
8. The cleaning schedules provided to the review team list the requirement to have MSDS avail-
able on the work site.
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 4
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 4
April 2013 Rating: 4
Implementation Scale:
20 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.12 - School Safety - Inspection and
Correction of Unsafe Conditions
Legal Standard:
Building examinations are performed, and required actions are taken by the Governing Board upon
report of unsafe conditions. [EC 81162]
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the CEO
3. 2012-13 scheduled maintenance projects, Fusion report
4. Health and Safety Committee meeting minutes
5. Injury and Illness Prevention Program, December 4, 2012
6. MSDS training sign-in sheet, March 26, 2013
7. SWACC property and liability inspection follow-up audit performed by Keenan &
Associates, October 2012
8. CEO site walk documentation, November 2012
9. Routine Maintenance Procedures – Cleaning
10. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. A maintenance and operations planned work list was developed containing $198,000 of re-
pairs and improvements for the 2011-12 fiscal year. The improvements listed included repairs
to the boiler systems, roofing, restrooms, concrete and asphalt surfaces, doors, ceiling tile,
sports field, lighting, and cafeteria. Documentation verifying completion of work was re-
quested but not provided. However, site walks provided visual confirmation of improvements
in some restrooms and doors, repairs and patches in concrete and asphalt surfaces, and reju-
venation of the cafeteria common area.
2. Health and Safety Committee meeting minutes recorded discussion items involving the iden-
tification and reporting of safety issues and the actions taken to remedy the issues identified.
However, FCMAT did not receive requested evidence indicating a schedule for facilities in-
spections and the reporting of unsafe conditions to the board.
3. The IIPP, updated in December 2012, contains a hazardous materials and protection checklist
for use in inspecting laboratories and facilities. Included in the program are scheduled and
unscheduled inspections and a form to complete and submit if hazards are found. The form is
outdated because it lists the previous director of facilities as the person who is to review and
take action on the reported hazards.
4. The SWACC follow-up audit performed by Keenan stated that issues still exist with outdated
chemicals in the Building C chemistry lab that should be removed for proper disposal. Prog-
ress was made with removal of hazardous materials from the storage yard, but a new finding
was made with regard to the storage of flammable goods and containers.
ACCJC Standard III 21
5. Interviews indicated that the CEO was scheduling regular site walks. The report of the CEO’s
site walk performed on November 20, 2012 and staff assignments to correct deficiencies was
provided to the review team. It is unknown whether these deficiencies were addressed, be-
cause no documentation was provided to FCMAT indicating work completed. No evidence of
additional inspections or follow-up was provided.
6. The cleaning schedules provided to the review team list the requirement to fix or report un-
safe conditions.
Standard Implemented: Partially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 5
June 2012 Rating: 4
April 2013 Rating: 4
Implementation Scale:
22 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.14 - School Safety -
Sanitation is Maintained and Fire Hazards are Corrected
Legal Standard:
Sanitary, neat, and clean conditions of the school premises exist and the premises are free from con-
ditions that would create a fire hazard. [CCR Title 5 §633]
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. 2012-13 scheduled maintenance projects, Fusion report
3. Injury and Illness Prevention Program, December 4, 2012, Version #18
4. SWACC property and liability inspection follow-up audit performed by Keenan &
Associates, October 2012
5. Routine Maintenance Procedures – Cleaning
6. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. The condition of the campus continues to show signs of a lack of thorough cleaning and
maintenance. Although the facilities indicated evidence of custodial staff presence, a lack of
attention to detail, thoroughness, and work quality was apparent. For example, main floor
areas in hallways and restrooms were swept and/or mopped but significant dirt and residue
was building along the edges and in the corners. During FCMAT’s fieldwork, the campus
was mostly clear of litter. Much of the lawn was torn out or had traffic wear due to construc-
tion traffic and parking. However, the remaining grass was green and recently mowed. Weeds
have been unabated for a long time and were well established in flower beds, among bushes,
and along buildings.
2. The maintenance yard debris piles were cleaned up during this review period to make way for
the central plant construction, yet other areas of the maintenance yard remain unorganized.
3. The maintenance department contracts annually for all fire extinguishers to be serviced dur-
ing the summer. The utility maintenance workers are responsible for checking all fire ex-
tinguishers monthly, which includes dating and initialing the tags on each fire extinguisher.
Extinguishers observed by FCMAT reflected current service and inspections.
4. The SWACC follow-up audit includes findings regarding the storage of flammable goods,
evacuation maps that should be clearly posted, electric power cords that should be replaced,
and fire extinguishers that should be properly placed, marked, and routinely inspected.
5. The Routine Maintenance Procedures detail tasks that are to be completed to provide a safe,
clean, and functional environment. However, FCMAT found no evidence that accountability
measures are in place to ensure these procedures are followed and tasks are completed.
ACCJC Standard III 23
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 4
Implementation Scale:
24 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.15 - School Safety - Injury/Illness
Prevention Program Inspections are Done
Legal Standard:
The Injury and Illness Prevention Program (IIPP) requires periodic inspections of facilities to iden-
tify conditions. [CCR Title 8 §3203]
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the CEO
3. Board Policy 8500, Illness and Injury Prevention, November 17, 2009
4. Administrative Regulation 8502, Illness and Injury Prevention Program, March 15, 2010
5. Administrative Regulation 8503, Hazardous Material Communication Program, March 15,
2010
6. Injury and Illness Prevention Program, December 4, 2012, version #18
7. Routine Maintenance Procedures - Cleaning
8. CEO site walk documentation, November 2012
9. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. The IIPP provided to FCMAT was updated in December 2012 but was largely the same as
that presented in the previous review. The plan remains incomplete and lacks appendices.
Further, the plan is outdated because it identifies the previous director of facilities as the per-
son who is to review and take action. The document specifies the following inspections:
Scheduled Safety Inspections
Upon initial implementation of the Program inspections of all work areas will be con-
ducted. All inspections will be documented using the attached forms (or equivalent) with
appropriate abatement of any hazards detected.
Thereafter, safety inspections will be conducted at the frequency described below:
1. Annual inspections of all office areas will be conducted to detect and eliminate any
hazardous conditions that may exist.
2. Semi-annual inspections of all potentially hazardous areas (shops, cafeterias, ware-
houses, gymnasiums, sheds, etc.) will be conducted to detect and eliminate any hazard-
ous conditions that may exist.
Unscheduled Safety Inspections
1. Additional safety inspections will be conducted whenever new equipment or changes
in procedures are introduced into the workplace that presents new hazards.
ACCJC Standard III 25
2. The Director of Maintenance & Operations or designee will conduct periodic unsched-
uled safety inspections of all potentially hazardous areas to assist in the maintenance of
a safe and healthful workplace.
3. Safety reviews will be conducted when occupational accidents occur to identify and
correct hazards that may have contributed to the accident.
2. FCMAT requested but was not provided documentation indicating that required safety in-
spections occurred during this review period.
3. The report of the CEO’s site walk performed on November 20, 2012 and staff assignments to
correct deficiencies was provided to the review team. It is unknown whether these deficien-
cies were addressed because no documentation was provided to FCMAT indicating work
completed. No evidence of additional inspections or follow-up was provided.
4. The cleaning schedules list the requirement to fix or report unsafe conditions. However, no
evidence of reporting or repairs was provided to confirm that the procedures are followed.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 3
April 2013 Rating: 3
Implementation Scale:
26 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.18 - School Safety - Plan for Prevention
of Campus Crime and Violence
Legal Standard:
A comprehensive school safety plan exists for the prevention of campus crime and violence. [EC
66300]
Sources and Documentation:
1. Interviews with the CEO, interim director of facilities planning and operations, and campus
police lieutenant
2. Workplace Security Plan, approval pending
3. El Camino College Compton Center Campus Police Campus Security Report, 2009-11
4. Injury and Illness Prevention Program, December 2012, version #18
5. Health and Safety Committee meeting minutes
6. Campus police – campus alert (website)
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Workplace Security Plan establishes the minimum requirements to maintain the follow-
ing goals included in the plan: 1) to make every employee aware of the potential for violence
in the workplace, 2) to increase the employee’s ability to recognize the early warning signs of
a potentially violent person or situation, 3) to explain how to record incidents indicative of a
potential problem, and 4) to encourage employees to report suspicious incidents to the appro-
priate manager through proper procedures.
2. The district’s IIPP for workplace security addresses the hazards known to be associated with
the three major types of workplace violence. Type I workplace violence involves a violent
act by an assailant with no legitimate relationship to the workplace who enters the workplace
to commit a robbery or other criminal act. This type may also include an intruder attack at a
district office or the taking of hostages. Type II involves a violent act or threat of violence by
a recipient of a service provided by the district, such as a student, customer, passenger or a
criminal suspect or prisoner. Examples may include a disgruntled student or employee who
attempts to retaliate against the actions of faculty or staff such as a threat issued because of
poor grades, work assignments and/or personality conflicts. Type III involves a violent act or
threat by a current or former employee, student, supervisor or manager, or an employee’s or
student’s spouse or lover, an employee’s or student’s relative or friend, or another person who
has a dispute with an employee or student.
3. The campus police post a campus alert on the district website to inform the public about inci-
dents that occur on campus and to provide information on how to protect oneself and report
activities to the proper authorities. However, the latest posting occurred in January 2012.
4. The El Camino College Compton Center Campus Police Campus Security Report is report-
edly prepared annually and provides information and statistics on crime, burglary, theft, ar-
rests, and other violations. The report also provides information for students and staff includ-
ACCJC Standard III 27
ing ways to stay informed, warnings and evacuations, available programs and services, policy
and procedures, and crime prevention tips.
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
28 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.22 - School Safety - Safety Boilers and
Fired-Pressure Vessels
Legal Standard:
Safe work practices exist with regard to boiler and fired-pressure vessels. [CCR Title 8 §782]
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Blanket purchase orders dated August 8, 2012 for pool services, first quarter HVAC services,
air conditioning repair, and roof repair as needed
3. List of outsource vendors used, 2011-12
Progress on Implementing the Recommendations of the Recovery Plan:
1. Interviewees stated that boiler maintenance continues to be outsourced. Documentation pro-
vided to the review team included blanket purchase orders for pool services, first quarter
HVAC services, air conditioning repair, and roof repair as needed. No documentation was
provided to confirm outsourcing or to support that safe work practices exist with regard to
boiler and fired-pressure vessels.
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 4
Implementation Scale:
ACCJC Standard III 29
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.24 - School Safety - Maintenance of a
Comprehensive Employee Safety Program
Professional Standard:
The college maintains a comprehensive employee safety program. Employees are made aware of the
college safety program, and the college provides in-service training to employees on the require-
ments of the program.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Board Policy 8200, Emergency Response Plan, October 20, 2009
3. Tartar Safety Committee Mission Statement
4. Health and Safety Committee meeting agendas and minutes
5. Injury and Illness Prevention Program, December 4, 2012
6. Consolidated Contingency Plan, May 2011
7. First Aid, Cardiopulmonary Resuscitation (CPR), Automated External Defibrillator (AED)
training certifications
8. Work Environment Expectations, April 2011
9. Safety training schedule and related sign-in records, 2012-13
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Tartar Safety Committee mission statement is: “Our Mission is to provide and maintain
a safe campus environment through planning, training, education and dedication to improve
safety for our students, visitors, faculty and staff.”
2. The Work Environment Expectations document states that “every employee is responsible for
safety and for achieving the District’s goal of providing a safe work environment.”
3. The IIPP states that the program “describes the goals, statutory authority, and the responsi-
bilities of all employees under the Program. It addresses Compliance, Hazard Identification,
Accident Investigation, Hazard Mitigation, Training, Hazard Communication, and Program
Documentation. By making employee safety a high priority for every employee we can re-
duce injuries and illnesses, increase productivity, and promote a safer and healthier environ-
ment for all individuals at the Compton Community College District.”
4. The Consolidated Contingency Plan identifies emergency response plans and procedures for
the campus. The plan includes prevention, mitigation and abatement of hazardous materials.
The plan also includes notification procedures and employee training.
5. The Health and Safety Committee meets for one hour monthly to discuss needs, concerns,
and updates to issues. Members of the committee include staff from the maintenance and op-
erations department, campus police, faculty, administration, and student representatives.
30 ACCJC Standard III
6. The 2012-13 safety training schedule identified training for MSDS, electrical safety, blood
borne pathogens, heat stress, Cal/OSHA inspections, confined space, forklift use, ladder
safety, eye safety, and the IIPP. Except for ladder training in April 2013 and MSDS in March
2013, no records were provided to indicate that the other employee safety trainings were con-
ducted in 2012-13. In response to FCMAT’s document request, the district provided records
of training for Cal/OSHA, hazard communication, blood borne pathogens, and electrical
safety in 2011; and Sloan Valve repair and maintenance, readiness briefing, and grievance
procedures in 2010. No schedule for future trainings was provided.
7. Maintenance staff completed first aid, CPR, and AED objectives and skills evaluations in ac-
cordance with the American Heart Association Heartsaver First Aid CPR AED program in
November 2012.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 5
January 2010 Rating: 4
July 2010 Rating: 5
June 2012 Rating: 6
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 31
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 1.25 - School Safety - Conduct of First
Aid Training for School Site Personnel
Professional Standard:
The college conducts periodic first aid training for employees.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Board policy
3. First Aid CPR AED training certifications
4. Safety training schedule and related sign-in records, 2012-13
Progress on Implementing the Recommendations of the Recovery Plan:
1. There has been no change to the board policy for school safety during this review period. The
district has created a draft board policy regarding minimum first aid training for all district
employees; however, the policy has not been finalized and adopted.
2. Maintenance staff completed first aid, CPR, and AED objectives and skills evaluations in ac-
cordance with the American Heart Association Heartsaver First Aid CPR AED program in
November 2012.
3. The 2012-13 safety training schedule identified training for MSDS, electrical safety, blood borne
pathogens, heat stress, Cal/OSHA inspections, confined space, forklift use, ladder safety, eye
safety, and the IIPP. Except for ladder training inA pril 2013, MSDS in March 2013, and first
aid evaluations in November 2012, no records were provided to indicate that the other employee
safety trainings were conducted in 2012-13. No schedule for future trainings was provided.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 4
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 3
April 2013 Rating: 4
Implementation Scale:
32 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.2 - Facility Planning -
Facilities Planning Manual
Professional Standard:
The college possesses a Facilities Planning Manual for the California Community Colleges.
Sources and Documentation:
1. Facilities Master Plan Update, July 2012
2. 2014-18 Five-Year Construction Plan, August 9, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district updated its Facilities Master Plan in July 2012. The plan includes sections cover-
ing construction, improvements, existing inventory, projected needs, priorities and recom-
mendations.
2. The district uses the online Facilities Planning Manual of the California Community College
system. This plan includes the priority of its five-year construction plan projects and a budget
and narrative of each project’s intent and scope.
Standard Implemented: Fully - Sustained
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 8
January 2010 Rating: 10
July 2010 Rating: 10
June 2012 Rating: 10
April 2013 Rating: 10
Implementation Scale:
ACCJC Standard III 33
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.3 - Facility Planning - Efforts to Seek
State and Local Matching Funds
Professional Standard:
The college seeks state and local funds.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the CEO
3. Facilities Master Plan Update, July 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has been proactive and successful in seeking local funds for capital improve-
ments as evidenced by the passage of Measure CC in November 2002, which authorized the
issuance of $100 million in general obligation bonds. This bond measure authorized funds to
repair and renovate instructional classrooms and job training facilities, and upgrade security
systems, electrical capacity, computer technology, energy efficiency, and roofing systems.
2. The district issued general obligation bond Series 2004A for $41 million, Series 2009B for
$15 million, and Series 2012C for $15,001,122. As of June 2012, the district had a bond fund
balance of $24,332,875 and approximately $29 million in remaining authorization. The dis-
trict expects to sell the remaining authorization within the next 15 months. The district should
review general obligation bond arbitrage requirements and conduct an analysis based on the
issuance dates of its bonds.
3. The district has in the past effectively maximized local dollars with state funding for the
infrastructure replacement capital outlay projects. The receipt of any new state funding and
management of these projects will reside with El Camino CCD, which has the management
responsibility to ensure that projects stay within scope of work and budget as proposed.
4. The Compton CCD continues to work on three state funded infrastructure projects that have
been ongoing since the last review period. However, no new funding has been sought from
the state.
5. The district is planning for its next general obligation bond and hopes to propose another
$100 million bond in the next two years.
34 ACCJC Standard III
Standard Implemented: Fully - Sustained
April 2007 Rating: 6
January 2008 Rating: 6
July 2008 Rating: 7
June 2009 Rating: 10
January 2010 Rating: 10
July 2010 Rating: 10
June 2012 Rating: 10
April 2013 Rating: 10
Implementation Scale:
ACCJC Standard III 35
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.5 - Facility Planning - Properly Staffed
and Funded Facility Planning Function
Professional Standard:
The college has a properly staffed and funded facility planning department.
Sources and Documentation:
1. Interviews with the CEO and the interim director of facilities planning and operations
2. Compton CCD Organizational Chart, April 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton CCD continues to seek a permanent director of facilities planning and opera-
tions. Since the last review, the manager of facilities, maintenance and operations position
was vacated, leaving no permanent management staff in the facilities department.
2. The current staff includes an interim director of facilities planning and operations. The in-
terim director was a senior project manager for a construction management firm and worked
with the district in that capacity for several years.
3. The district augments planning of capital construction and modernization projects by con-
tracting for architecture and construction management services. The current construction
management contract for El Camino CCD is expiring, and the district is in the process of re-
viewing proposals for services.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 1
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 7
Implementation Scale:
36 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.6 - Facility Planning - Implementation
of an Annual Capital Planning Budget
Professional Standard:
The college has developed and implemented an annual capital planning budget.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Facilities Master Plan Update, July 2012
3. 2014-18 Five-Year Construction Plan
4. Measure CC Project List
5. Maintenance and operations planned work list, 2011-12
6. 2012-13 Site Improvement Preliminary Plan
7. Proposed tentative budget report, 2012-13 and 2013-14
Progress on Implementing the Recommendations of the Recovery Plan:
1. The 2011-12 adopted budget included a $198,000 budget for site improvements. The projects
included boiler repair, roofing maintenance and repairs, restroom refurbishment, asphalt and
concrete walkways and paths repair, door hardware and ADA access repair, exterior and inte-
rior lighting repair and replacement, and kitchen equipment repairs.
2. The 2012-13 site improvement preliminary plan lists vendors and amounts totaling $100,000
for music building flooring, gym flooring, and other projects that are to be prioritized.
3. The district’s five-year capital outlay plans are developed and updated in Fusion, a Web-
based project planning and management software used by all of California’s community
college districts and the California Community Colleges Chancellor’s Office to support their
facilities. Fusion facilitates project scenario planning analysis as a decision-making tool to
determine the district’s priority for projects receiving state funding under the five-year capital
outlay plan. Each project is defined by budget, intent and scope including the anticipated time
schedule and why the project is needed.
4. The district provided a report that included a building maintenance and repairs “proposed
tentative” budget totaling $1,448,753 for 2012-13 and $3,316,574 for 2013-14. The report
includes budget code lines, but projects are not listed.
ACCJC Standard III 37
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 9
April 2013 Rating: 8
Implementation Scale:
38 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.10 - Facility Planning - Assessment of
Local Bonding Capacity and Monitor Legal Bonding Limits
Legal Standard:
The college assesses its local bonding capacity. [EC 15100]
Sources and Documentation:
1. Interviews with the CEO and the interim director of facilities planning and operations
2. Facilities Master Plan Update, July 2012
3. Citizens’ Bond Oversight Committee meeting agendas and minutes
4. Bonding Capacity Estimation, 2012-13
5. Bond audit historical assessed valuations from California Municipal Statistics, Inc.
6. Compton CCD Measure CC Bond Audit Report, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has historical assessed valuations provided by California Municipal Statistics, Inc.
2. According to the bonding estimation for 2012-13, the district’s gross bonding capacity is
$203,729,292.69. After deducting $62,776,122.25 of outstanding bonded debt, the net capac-
ity is estimated at approximately $141 million. FCMAT requested from the district but was not
provided a certificate from the county auditor-controller to verify current bonding capacity.
3. Under the provisions of Proposition 39, a citizens’ oversight committee must be established
to review progress on construction projects and the expenditure of bond funds. During the
2011-12 fiscal year, the committee was re-formed and only met during the final two months
of the fiscal year. The 2012 Compton CCD Measure CC Bond Audit Report indicates the
Citizens’ Bond Oversight Committee did not meet the compliance requirements.
Standard Implemented: Fully - Substantially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 8
January 2010 Rating: 9
July 2010 Rating: 10
June 2012 Rating: 9
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard III 39
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.11 - Facility Planning -
Process to Determine Debt Capacity
Professional Standard:
The college has developed a process to determine debt capacity.
Sources and Documentation:
1. Interview with the CEO
2. Compton CCD Measure CC Bond Audit Report, 2012
3. Bonding Capacity Estimation, 2012-13
4. Bond audit historical assessed valuations from California Municipal Statistics, Inc.
5. Keygent advisors current bonding capacity
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has no documented process to regularly determine, confirm or evaluate its debt
capacity.
2. The estimated assessed valuation for 2012-13, as provided by Keygent advisors and subject
to confirmation by the county auditor-controller, is $16,298,343,415. Applying the statutory
debt limit of 1.25% less the outstanding principal of current general obligation bonds leaves
the district with a net available bonding capacity of $140,953,170. No official confirmation of
the valuation was obtained from the auditor-controller.
Standard Implemented: Fully - Substantially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 8
January 2010 Rating: 9
July 2010 Rating: 10
June 2012 Rating: 9
April 2013 Rating: 8
Implementation Scale:
40 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.12 - Facility Planning - Awareness and
Monitoring of Assessed Valuation
Professional Standard:
The college is aware of and monitors the assessed valuation of taxable property within its boundaries.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the interim director of facilities planning and operations
3 Compton CCD Measure CC Bond Audit Report, 2012
4. Bonding Capacity Estimation, 2012-13
5. Bond audit historical assessed valuations from California Municipal Statistics, Inc.
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has successfully passed and issued local general obligation bonds under Measure
CC, authorized by the local voters in November 2002. The assessed valuations of taxable
property and fluctuations that may affect the district’s bonding capacity are available from the
Los Angeles County Auditor-Controller’s Office.
2. The estimated assessed valuation for 2012-13, as provided by Keygent advisors and subject
to confirmation by the county auditor-controller, is $16,298,343,415. No confirmation was
obtained in the current year.
3. The district has a report that includes assessed valuation history, land use analysis, residential par-
cel assessment analysis, delinquency history, largest secured taxpayers, and historical tax rates .
Standard Implemented: Fully - Sustained
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 8
January 2010 Rating: 9
July 2010 Rating: 10
June 2012 Rating: 10
April 2013 Rating: 10
Implementation Scale:
ACCJC Standard III 41
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 2.16 - Facility Planning - Priorities
and Scheduling of Projects
Professional Standard:
The college has established and utilizes an organized methodology of prioritizing and scheduling
projects.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interviews with El Camino CCD facilities consultants
3. Planned work list and funding, 2011-12
4. 2012-13 scheduled projects, Fusion report
5. 2014-18 Five-Year Construction Plan
Progress on Implementing the Recommendations of the Recovery Plan:
1. According to Education Code 15278, the purpose of the Citizens’ Bond Oversight Committee
is to “inform the public concerning the expenditure of taxpayers’ money for school construc-
tion.” The Compton CCD committee resumed meetings in May 2012.
2. The 2014-18 Five-Year Construction Plan was updated August 9, 2012 and includes a priori-
tized list of 14 projects in alignment with the prior plan.
3. The district has continued its engagement with construction management consultant Lend
Lease to assist with the state-funded projects.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
42 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.1 - Facilities Improvement
and Modernization - Appropriate Use of the Scheduled Maintenance and Special
Repair Funding in the Capital Outlay Projects Funds
Legal Standard:
The college has a restricted capital outlay fund, and a portion of those funds is expended for
maintenance and special repairs only. [EC 84660]
Sources and Documentation:
1. Interview with the CEO
2. Interview with the interim director of facilities planning and operations
3. 2014-18 Five-Year Construction Plan
4. 2013-14 Unrestricted Budget 8700
5. Facilities Master Plan Update, July 2012
6. Learning Resource Center Schedule, August 17, 2012
7. Learning Resource Center recommendations for next steps, updated July 30, 2012
8. Invoice and contract for repair work completed, December 2011
9. Blanket purchase orders dated August 8, 2012 for pool services, first quarter HVAC services,
air conditioning repair, and roof repair as needed
10. Purchase order for repair of cafeteria griddle
11. Annual Audit Report, 2011-12
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district provided agendas and minutes of the Citizens’ Bond Oversight Committee meet-
ings and an estimate regarding the outstanding bonding capacity of the district. However,
no financial activity reports from the district’s financial system depicting capital for routine
maintenance and special repair projects for 2012-13 were provided in response to FCMAT’s
document request. Instead, the district provided a copy of its June 30, 2012 audit report pre-
pared by Vavrinek, Trine, Day and Company, LLP.
2. Blanket purchase orders for pool services, first quarter HVAC services, air conditioning re-
pair, and roof repair were issued for fiscal year 2012-13 totaling $51,000.
3. A purchase order for $1,500 was issued for repair of the cafeteria griddle.
4. At the time of FCMAT’s fieldwork, the following projects were active:
a. Learning Resource Center (LRC) – Barrel vault project (glass sill replacement) has been
completed; however, the district was still negotiating a settlement agreement with Chevron
Energy Systems. Subsequent to FCMAT’s fieldwork, the district provided the team with a
revised project schedule and recommendations for next steps to close out the LRC project.
Based on the revised schedule, the district anticipates that it will open and occupy the LRC
facility by February 2014.
ACCJC Standard III 43
b. Infrastructure Replacement Phase 1 was under construction.
c. Management Information Systems (MIS) Building Reprogramming project was mostly
complete and functioning.
d. Infrastructure Replacement Phase 2 was under construction.
5. The district provided a copy of an invoice for water leak detection at the police briefing room
and a contract for asbestos abatement air sampling, both dated December 2011, as support
for this standard. No other invoices or proof of payments were provided to show more recent
maintenance or repair activity.
6. The district provided its 2013-14 Unrestricted Budget 8700 report for building maintenance
and repairs. The columns on the report listed actual expenses for 2010-11 and 2011-12, year-
to-date expenses for 2012-13 and “proposed tentative” for 2012-13 and 2013-14. The total
actual expenses were $2,011,733.67 for 2010-11 and $2,825,208.82 for 2011-12. The report
identified “proposed tentative” budget totaling $1,448,753 for 2012-13 and $3,316,574 for
2013-14. Year-to-date expenses were $0 for 2012-13. The report includes budget code lines,
but projects are not listed nor are details documented to support expenditures.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 9
June 2012 Rating 8
April 2013 Rating: 6
Implementation Scale:
44 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.4 - Facilities Improvement
and Modernization - Plan for Maintenance and Modernization Exists
Legal Standard:
The college maintains a plan for the maintenance and modernization of its facilities. [EC 84660,
84670-84674]
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the CEO
3. Citizens’ Bond Oversight Committee minutes
4. 2014-18 Five-Year Construction Plan
5. Facilities Master Plan Update, July 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district’s Facilities Master Plan Update prepared by HMC Architects contains detailed
information regarding the district’s projects, including project justification, descriptions, and
costs; priority order; load distribution; staff forecast; instructional focus; and whether the
project is to be funded through local funds, the state or both. The plan includes detailed infor-
mation on infrastructure upgrades for the health and safety of students and staff.
2. Information included in the Facilities Master Plan Update indicated that the campus has ex-
isted in its current location for almost six decades and has been distinguished by the high
quality and durability of its facilities. Many of the buildings have a long history of service,
and there is a need to address issues arising from the evolving building code, aging infra-
structure, and deferred maintenance, and to embrace advances in energy efficiency and edu-
cational technology. Analysis of the condition and cost to rehabilitate these facilities led to
the identification of those for which renovation is not a feasible option. In addition, the analy-
sis of the existing campus identified temporary facilities to be replaced with space in perma-
nent facilities.
The Facilities Master Plan states in its introduction that it is designed to:
• Meet the requirements of the State Chancellor’s Office.
• Assist in decision making at the campus and the district.
• Tie directly into the Five-Year Capital Construction Plan.
• Be a living document to be revisited regularly.
3. At the time of FCMAT’s fieldwork, the manager of facilities, maintenance, and operations
was no longer with the district and an interim director of facilities planning and operations
was overseeing facilities work.
ACCJC Standard III 45
4. The district has migrated from the School Preventative Maintenance System to the School
Dude system for processing and managing maintenance work orders. The El Camino CCD
had an existing contractual relationship with School Dude, and the Compton Center was
added as a satellite school. This accessibility helps staff to quickly identify facility concerns
and request repairs, and allows maintenance staff to more expeditiously learn of issues and
prioritize repairs. The School Dude work order system is also beneficial in that it allows
maintenance to track work orders electronically to ensure completion and to prevent or more
efficiently address common problems.
Standard Implemented: Fully – Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
46 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.6 - Facilities Improvement
and Modernization - Maintenance of a System for Tracking Project Progress
Professional Standard:
The college has established and maintains a system for tracking the progress of individual projects.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the CEO
3. Interview with the CBO
4. School Dude work order samples
5. Capital Facilities and Measure CC Project Report, April 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has contracted with Lend Lease to monitor and track all state and local facili-
ties projects. Lend Lease utilizes the Impact 3D/I software program that is integrated with
the California Community Colleges Chancellor’s Office Fusion software and the district’s
PeopleSoft financial software. The software is Web-based and allows for portal entry for data
uploads with multiple level security. The software provides real-time data and includes but is
not limited to reimbursement requests, initial and final project proposals in Fusion, contracts,
invoices, warrants and cash flow statements by project.
2. During the prior review period, the district migrated to a different work order processing software
(School Dude) and processes to track ongoing projects and schedule routine duties. This sys-
tem enables management to identify and communicate progress of individual facilities projects
including maintenance and repair. School Dude allows management to plan projects, allocate
resources, track the project and record progress/completion dates. Further, it enables the director
to communicate planned project completion dates, track open projects and verify project comple-
tion. The interim director of facilities planning and operations has received training on the School
Dude system. Per documentation from the district, the training included the following topics:
• Overview of the School Dude system
• How to input a work request
• How to print a work request
• How to track a work request
• How to status work orders
• How to gain access to key users, resources and additional training
3. The most recent meeting of the Citizens’ Bond Oversight Committee was February 28, 2013.
During this review period, the CEO provided FCMAT a verbal briefing on the status of the
LRC building. The district anticipates that the project will be complete by February 2014. In-
terviews indicated that all outstanding litigation on the project has been resolved, except for
the lawsuit involving Chevron Energy Solutions.
ACCJC Standard III 47
A new architect of record for the LRC, NTD Architecture, has been retained to develop plans
and bid specifications to complete any outstanding items with the Division of the StateA rchitect
(DSA). The previous architect of record has forwarded all of its documentation to NTD to as-
sist with project closeout. Initially, the district thought there were over 160 outstanding punch list
items, but on further review, there appear to be approximately 60 that still need DSA approval.
4. The Capital Facilities and Measure CC Project Report provides the following information on
district projects:
• Little Theater. The district held a kickoff meeting on April 5, 2013 to introduce the new
project architects, WLC, to staff and provide an update on the scope of work. The estimat-
ed total project cost is $1.2 million.
• Server Room and MIS Building Enhancements. Phase I of the project (VOIP, HVAC and
window closure) was substantially complete as of November 2012. A notice of completion
on the project was filed in February 2013.
• Phase I Central Plant/Stadium Lighting. Installation of structural steel commenced on
March 5, 2013. Perimeter site walls have been constructed and construction of the CMI
portion of the project is under way. The cooling tower for the Central Plant was installed
on April 4, 2013. Stadium lighting design documents are being reviewed by DSA.
• Phase I Utility Infrastructure. Construction has commenced. This project includes the
installation of a new 10-inch fire line, new sanitary sewer, natural gas and electrical main
lines and the redesign of the sidewalk and interior courtyard.
• Phase II Utility Infrastructure. Installation of the asphalt at lot F was approximately complete
in April 2013. Demolition of the asphalt in lots D and E was ongoing during this review.
• Allied Health. The district received bids on the Allied Health project on January 22, 2013.
However, the bids were over the architectural estimate. The Department of Finance origi-
nally funded the project as a modernization; however, the plans call for the demolition and
replacement of the existing building. The project was being reviewed by DOF at the time
of this review.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 9
Implementation Scale:
48 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.7 - Facilities Improvement
and Modernization - Furniture and Equipment Included in Modernization Program
Professional Standard:
Furniture and equipment items are routinely included within the scope of modernization projects.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the CEO
3. Interview with the CBO
4. Facilities Memorandum of Understanding between Compton CCD and El Camino CCD,
January 23, 2013
5. Allied Health Building Detailed Equipment List
6. Physical inspection of new construction including the LRC, MIS, Utility Infrastructure Phase
I and II projects
Progress on Implementing the Recommendations of the Recovery Plan:
1. FCMAT reviewed the Facilities Memorandum of Understanding between the Compton CCD
and the El Camino CCD dated January 23, 2013 regarding the following projects:
Infrastructure Phase I Estimated Cost - $37,714,000
Infrastructure Phase II Estimated Cost - $19,498,000
Allied Health Renovation Project Estimated Cost - $13,270,000
2. Furniture and equipment planning are essential to ensure the facilities accommodate users’
needs and maximize the safe, effective and efficient use of facilities. The district provided a
furniture and equipment list for the Allied Health Building renovation project, but not in de-
tail. The Infrastructure Phase I and II projects pertain solely to utility replacement and do not
include furniture and equipment.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 49
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.8 - Facilities Improvement
and Modernization - Technology Infrastructure Needs for Facilities Projects
Professional Standard:
Refurbishing, modernization, and new construction projects take into account technology
infrastructure needs.
Sources and Documentation:
1. Interview with the CEO
2. Interviews with information technology staff
3. Facilities Master Plan Update, July 2012
4. 2011-16 Technology Plan
5. 2012-17 Comprehensive Master Plan
6. Physical inspection of upgraded MIS facility and selected classrooms
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has developed a Comprehensive Master Plan using the program review process
to drive outcome. The program review process asks members of a discipline or department
to critically assess their program, identify necessary adjustments, and design a mechanism to
institute and evaluate proposed changes. Desired outcomes from the program review process
include evaluation of program effectiveness, program development and improvement, clarifi-
cation and achievement of program goals, assessment of student learning outcomes, and link-
age of planning and budgeting.
2. The district’s Technology Plan is integrated into the Comprehensive Master Plan. The Tech-
nology Plan indicates that it follows the Educational Plan and takes into consideration the
many technological needs cited in that chapter. The Technology Plan provides a technology
vision for the district and Compton Center, guiding planning principles, technology issues to
consider, resources, training, and the need for funding at both the district and the center. Last-
ly, the plan lists planning agenda items to address the issues facing the district and the center.
The district is engaging in a self-assessment process to determine the needs and associated
costs of upgrading infrastructure, including technology. The MIS and Facilities departments
are beginning to communicate with each other regularly.
50 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard III 51
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 3.13 - Facilities Improvement
and Modernization - Knowledge of Office of Public School Construction and the
Division of the State Architect Procedures
Professional Standard:
College staff are knowledgeable of procedures in the Division of the State Architect (DSA).
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Architectural drawings
3. DSA list of recent submittals
Progress on Implementing the Recommendations of the Recovery Plan:
1. DSA provides design and construction oversight for school districts and community colleges.
DSA develops and maintains accessibility standards and codes utilized in public and private
buildings throughout California. The regulations are complex and continually change.
2. During the last review, the director of facilities position was vacant. The district recently
hired an interim director of facilities planning and operations who has overall responsibility
for facilities, maintenance, custodial, and grounds. The new interim director served previ-
ously as a senior project manager for a construction management firm that worked with the
district for several years. The interim director has a history with the district in construction
planning and development and knowledge of DSA.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
52 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 4.1 - Construction of Projects -
An Appropriate Project Management Structure Exists
Professional Standard:
The college maintains an appropriate structure for the effective management of its construction projects.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the CEO
3. Interview with the CBO
4. Board Policy 3300, Capital Construction, April 20, 2010
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district adopted Board Policy 3300, Capital Construction, which dictates the CEO’s re-
sponsibility to plan and manage the district’s capital outlay and construction programs.
2. The district has contracted with Lend Lease to monitor and track all state and local facilities
projects. Lend Lease utilizes the Impact 3D/I software program that is integrated with both
the California Community Colleges Chancellor’s Office Fusion software and the district’s
PeopleSoft financial software. The software is Web-based and allows for portal entry for data
uploads with multiple-level security. The software offers real-time data and includes reim-
bursement requests, initial and final project proposals in Fusion, contracts, invoices, warrants
and cash flow statements by project.
3. The district had restructured key management positions at the time of FCMAT’s fieldwork.
The CBO position is filled; however, the director of facilities planning and operations is serv-
ing in an interim capacity.
4. Compton CCD is making efforts to build capacity by hiring and training internal staff. At the
time of FCMAT’s fieldwork, the director of facilities planning and operations position was
being advertised and an interim employee was serving in the position.
ACCJC Standard III 53
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
54 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 4.3 - Construction of Projects -
Maintenance of Appropriate Project Records and Drawings
Professional Standard:
The college maintains appropriate project records and drawings.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interviews with project managers, Lend Lease
3. Impact 3D/I software program
4. Physical inspection of drawing room and records
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district maintains an appropriate and organized automated and paper archive of all proj-
ect as-built architectural drawings and related contract documents. The more recent projects
are in good order and automated through the use of AutoCAD software.
2. The district contracts with project management, construction management, architect and en-
gineering firms that assist with project records management. The record-keeping system for
storing facility plans and drawings is adequate to fulfill this standard. However, records are
kept at multiple locations including the trailer where Lend Lease is housed and in the mainte-
nance department, rather than in one centralized location.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard III 55
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 5.3 - Compliance with Public Contracting
Laws and Procedures - Conflict of Interest Statements and Compliance
Professional Standard:
The college maintains files of conflict of interest statements and complies with legal requirements. Con-
flict of interest statements are collected annually by the President/Superintendent and kept on file.
Sources and Documentation:
1. Interviews with the CEO and CBO
2. Board Policy 2710, Conflict of Interest, December 15, 2009
3. Administrative Regulation 2711, Conflict of Interest Disclosure, December 15, 2009
4. Form 700 2012, Annual Filing of Statement of Economic Interests
Progress on Implementing the Recommendations of the Recovery Plan:
1. During a previous review period, documentation was provided to support an updated certi-
fication to the state special trustee regarding Form 700, Annual Filing of Statement of Eco-
nomic Interests for the director of facilities planning and management.
2. The district should update its board policies and list designated positions that must file the
annual Form 700. Because of the specific duties and responsibilities of the interim director of
facilities planning and operations position and the number of contracts the individual is re-
sponsible to oversee, this position should be included in any policy update.
3. The CEO and CBO have established procedures to collect the conflict of interest statements
for staff members who are employed by Compton CCD or El Camino CCD management
staff that work on the Compton campus. FCMAT requested an itemized list of employees re-
quired to complete the Form 700. According to the list, the interim director of facilities plan-
ning and operations had not completed the form.
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
56 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.1 - Facilities, Maintenance
and Custodial - Implementation of an Energy Conservation Policy
Professional Standard:
An energy conservation policy has been approved by the Board of Education and implemented
throughout the college.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Board Policy 3340, Energy and Sustainability, August 10, 2010
3. California Community Colleges Board of Governors Energy and Sustainability Policy,
undated
4. Facilities Master Plan Update, July 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD has adopted the California Community Colleges Board of Governors Energy
and Sustainability Policy that requires the district to exceed Title 24 regulations by 15% for
all construction projects approved at the college. The policy contains guidelines necessary
to reduce energy consumption pursuant to the Governor’s Executive Order that requires all
community colleges to participate in statewide energy conservation and reduced electrical de-
mand.
2. The district completed the Facilities Master Plan document that includes a critical component
on energy efficiency/sustainability. The plan details alternative methods to reduce energy and
alternative renewable energy sources for use in the design phase for all projects.
3. Board Policy 3340, Energy and Sustainability, was issued August 10, 2010. This policy dic-
tates the responsibility of the CEO in the development of a district energy and sustainability
plan. The policy also indicates that the CEO or designee shall establish regulations to ensure
the plan is properly administered, funded, executed, and monitored. Development and imple-
mentation of the energy conservation regulations are essential to full compliance with this
standard.
4. The district has embarked on two utility replacement projects, Infrastructure Phase I and
Phase II that, when fully implemented, should greatly reduce energy consumption.
ACCJC Standard III 57
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
58 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.3 - Facilities, Maintenance and Custodial
- Energy-Efficient Design Criteria for New Construction and Modernization
Professional Standard:
Cost-effective, energy-efficient design has been made a top priority for all college construction projects.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Energy and Sustainability Policy for School Design by California Community Colleges
Board of Governors
3. 2014-18 Five-Year Construction Plan
4. Board Policy 3340, Energy and Sustainability, August 10, 2010
5. Facilities Master Plan Update, July 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton College was originally constructed and occupied in the early 1950s, including the
utility infrastructure for the campus. Since construction of the original campus in 1953, four
buildings have been added. However, technology, power requirements, electrical upgrades,
mechanical upgrades, emergency communications, fire/life safety, and sewer requirements
have all changed per the Uniform Building Code requirements and the DSA’s office. The
board adopted BP 3340 on August 10, 2010, and has taken a number of incremental steps to
meet this standard. The district completed the Facilities Master Plan document that includes
a critical component on energy efficiency/sustainability. The plan details alternative methods
to reduce energy and alternative renewable energy sources for use in the design phase of all
projects.
2. Pursuant to Government Code Section 15814.30 regarding all new public facilities and Title
24 of the California Code of Regulations, Part 6 titled Energy Code, Compton CCD contract-
ed with Southern California Edison on behalf of the 2009 Bridge Period California Commu-
nity College Partnership Program. This program meets the California Community Colleges
Board of Governors energy efficiency and conservation goals, and the incentive for this pro-
gram is funded by the California Public Utilities Commission.
3. Board Policy 3340, Energy and Sustainability, was issued August 10, 2010. This policy dic-
tates the responsibility of the CEO in the development of a district energy and sustainability
plan. The policy also indicates the CEO or designee shall establish regulations to ensure the
plan is properly administered, funded, executed, and monitored. Regulations supporting the
policy should identify the importance of cost-effective and energy-efficient design.
4. The Phase I Utility Infrastructure project has commenced with construction. This project in-
cludes the installation of a new 10-inch fire line, new sanitary sewer, natural gas and electri-
cal main lines, and the redesign of the sidewalk and interior courtyard.
ACCJC Standard III 59
5. The Phase II Utility Infrastructure project has also begun construction. Installation of the as-
phalt at Lot F was almost complete in April 2013. Demolition of the asphalt in lots D and E
was ongoing during FCMAT’s fieldwork.
6. The 2014-18 Five-Year Construction Plan narratives reflect the incorporation of best prac-
tices training for staff, energy-efficient technology and energy management systems.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 9
Implementation Scale:
60 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.5 - Facilities Maintenance
and Custodial - Adequate Maintenance Records and Inventories
Professional Standard:
Adequate maintenance records and reports are kept, including a complete inventory of supplies, ma-
terials, tools, and equipment. All employees required to perform maintenance on the college sites are
provided with adequate supplies, equipment, and training to perform maintenance tasks in a timely
and professional manner. Included in the training is how to inventory supplies and equipment and
when to order or replenish them.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. District materials, equipment and tools inventory
3. Custodial supplies inventory
4. School Dude work order reports
5. Work Environment Expectations agenda, April 14, 2011
Progress on Implementing the Recommendations of the Recovery Plan:
1. The interim director of facilities planning and operations plans to implement the Hillyard
Cleaning Cost Analysis Program (CCAP) in fiscal year 2013-14. This program involves a site
study by Hillyard to include all custodial and janitorial areas. Cleaning and maintenance needs
are assessed based on a thorough evaluation of surface types and area size to determine the
proper products, methods, and staffing required to meet district standards. Once the analysis
is completed, job cards are developed for each process. The job cards include the standard,
method, supplies and equipment needed to complete each task, along with safety precautions.
Hillyard provides training for this program, including proper implementation and safety. An in-
ventory, budget control, and ordering system are also included in this program.
2. The district has implemented the School Dude work order system to schedule routine mainte-
nance tasks, track and assign work orders and manage larger maintenance and repair projects.
Supplies and equipment inventories are recorded manually. The district maintains an inven-
tory of supplies and materials and major equipment, including tools, that is manually tracked
in the inventory system. Employees use a checkout procedure to track the location of this
type of equipment.
3. The implementation of these programs should increase the efficiency of the maintenance staff
by organizing schedules, tracking equipment and supply inventories, standardizing proce-
dures and improving training and competency.
ACCJC Standard III 61
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 6
Implementation Scale:
62 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.6 - Facilities Maintenance
and Custodial - Procedures for Evaluation of Maintenance and Operations Staff
Professional Standard:
Procedures are in place for evaluating the work quality of maintenance and operations staff. The quality
of the work performed by the maintenance and operations staff is evaluated on a regular basis using a
board-adopted procedure that delineates the areas of evaluation and the types of work to be evaluated.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interviews with utility maintenance supervisors
3. Job descriptions
4. Sample employee evaluation
5. Board policies
6. Employee Handbook, August 2008
7. Collective Bargaining Agreement between Compton CCD and Compton Community College
Federation of Classified Employees, July 1, 2009 – June 30, 2012.
8. Classified evaluation list, 2011-12
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has adopted board policies regarding the evaluation process that include board-
approved standard evaluation forms.
2. The district has created a process to notify departments to help ensure that evaluations are
performed and submitted to the Human Resources Department in a timely manner. The col-
lective bargaining agreement between Compton CCD and the Compton Community College
Federation of Classified Employees provides for every permanent classified employee to be
evaluated annually, no later than May 1. One example of a completed performance evalua-
tion and a list of personnel evaluated during 2011-12 were provided to FCMAT subsequent
to fieldwork. At the time of FCMAT’s fieldwork, the 2012-13 evaluation cycle for classified
staff was not yet complete. However, the documentation provided indicated that the district
had completed evaluations for all maintenance and operations staff in 2011-12.
3. The employee handbook addresses performance evaluations as a key component of personal
development, promotion and compensation. The dean of human resources has provided in-
service training for supervisory personnel in the proper documentation of performance stan-
dards. The training also includes guidelines for both new and current supervisory personnel
in completing employee evaluations.
4. The dean of human resources has implemented procedures to track and ensure that evalua-
tions are done in compliance with board policy and collective bargaining agreements.
ACCJC Standard III 63
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
64 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.7 - Facilities Maintenance
and Custodial - Identification of Maintenance and Custodial Responsibilities
Professional Standard:
Major areas of custodial and maintenance responsibilities, and specific jobs to be performed, have
been identified. Custodial and maintenance personnel have written job descriptions that delineate the
major areas of responsibilities they will be expected to perform and on which they will be evaluated.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Routine maintenance procedure example
3. Maintenance and operations team meeting agenda
4. School Dude work order reports
5. Job descriptions
Progress on Implementing the Recommendations of the Recovery Plan:
1. Job definitions and duties are documented in the job descriptions of the maintenance and
custodial employees. Tasks and descriptions are identified by union job classification, e.g.,
carpenter or utility maintenance worker. Standardization of jobs and functions is ongoing in
an effort to help to define processes, responsibilities and performance levels.
2. The interim director of facilities planning and operations uses the School Dude work order
system to schedule routine maintenance tasks, work order tasks and repair projects.
3. The interim director of facilities planning and operations plans to implement the Hillyard
CCAP in 2013-14 to determine campus custodial needs. The program provides specific direc-
tion as to the frequency, method, supplies, equipment and time needed to complete each task.
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard III 65
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.8 - Facilities Maintenance
and Custodial - Availability of Custodial Supplies and Equipment
Professional Standard:
Necessary staff, supplies, tools, and equipment for the proper care and cleaning of the college are
available. To meet expectations, the college is adequately staffed, and staff is provided with the nec-
essary supplies, tools, and equipment as well as the training associated with the proper use of such.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interviews with utility maintenance supervisors
3. Hillyard CCAP records
4. School Dude reports
Progress on Implementing the Recommendations of the Recovery Plan:
1. The interim director of facilities planning and operations plans to implement the Hillyard
CCAP in fiscal year 2013-14 to determine campus facility custodial needs. The program
provides specific direction as to the frequency, method, supplies, equipment and time needed
to complete each task. Cleaning standards may be adjusted according to staffing available.
These adjustments in the CCAP ensure that regular essential cleaning is maintained while the
frequency of non-essential tasks is reduced.
2. The interim director of facilities planning and operations uses the School Dude work order
system to schedule routine maintenance tasks, work order tasks and repair projects.
3. The implementation of these programs should increase the efficiency of the maintenance and
operations staff by organizing schedules, tracking equipment and supply inventories, stan-
dardizing procedures, and improving training and competency.
4. Staff interviewed indicated that they had the supplies, tools and equipment needed to perform
their duties.
66 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 67
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.9 - Facilities Maintenance
and Custodial - Implementation of a Preventive Maintenance Program
Professional Standard:
The college has an effective preventive maintenance program that is scheduled and followed by the
maintenance staff. This program includes verification of completion of work by the supervisor of the
maintenance staff.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Board policy
3. Sample School Dude work order reports
4. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. The interim director of facilities planning and operations plans to implement the Hillyard
CCAP in fiscal year 2013-14 to determine campus facility custodial needs. The program
provides specific direction as to the frequency, method, supplies, equipment and time needed
to complete each task. Cleaning standards may be adjusted according to staffing available.
These adjustments in the CCAP ensure that regular essential cleaning is maintained while the
frequency of non-essential tasks is reduced.
2. The interim director of facilities planning and operations uses the School Dude work order
system to schedule routine maintenance tasks, work order tasks and repair projects.
3. Records of HVAC analysis, maintenance and work orders identify maintenance and repair
needs but do not indicate job status, scheduling or progress.
4. The Infrastructure Replacement projects, Phase I and II, have commenced with construction
and will address on- and off-site drainage issues observed during the prior review through a
revamping of the storm drain system.
5. All facilities maintenance work is of a routine or reactive nature. The district provided no
documentation indicating that a preventive maintenance program with scheduled tasks has
been established.
68 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 6
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard III 69
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.10 - Facilities Maintenance
and Custodial - Adequate Repair and Supervision of Buildings
Legal Standard:
The Governing Board of the college provides clean and operable flush toilets for use of students.
Toilet facilities are adequate and maintained. All buildings and grounds are maintained. [CCR Title 5
631, CCR Title 5 14030, EC 17576]
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Board policy
3. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. Deep cleaning and maintenance was reported to have occurred in restrooms. However,
FCMAT observed dirt and residue buildup in corners and around fixtures due to poor routine
cleaning and a lack of thorough or deep cleaning. Some limitations exist because of the age
and condition of the facilities.
2. Interviews indicated that programs are being implemented to ensure proper cleaning and
maintenance of facilities.
3. The condition of campus grounds improved from some previous reporting periods, but the
buildings were still in need of significant maintenance. The district needs to address ongoing
maintenance of its buildings with the same emphasis that is given to the modernization of
buildings and the construction of new facilities.
4. The district hired a male student worker in a short-term assignment who restocks supplies in
the men’s restrooms as part of his daily duties. The district is in the process of hiring a female
student worker to do the same for the women’s restrooms.
70 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 4
Implementation Scale:
ACCJC Standard III 71
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.11 - Facilities Maintenance
and Custodial - Planned Program Maintenance System
Professional Standard:
The college has implemented a planned program maintenance system that includes an inventory of
all facilities and equipment that will require maintenance and replacement. Data includes purchase
prices, anticipated life expectancies, anticipated replacement time lines, and budgetary resources
necessary to maintain the facilities.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the interim director of facilities planning and operations
3. Board policy
4. 2014-18 Five-Year Construction Plan
5. Facilities Master Plan Update, July 2012
6. School Dude work order reports
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD has a board/special trustee-approved Facilities Master Plan, and prepares the
required annual five-year deferred maintenance and space inventory plans. A complete Facili-
ties Master Plan has been completed regarding the condition and assessment of all buildings.
The plan includes components for energy efficiency, mechanical, electrical and fire alarm
systems, site utilities, technology, security and campus lighting. The Facilities Master Plan
is a blueprint for the district to follow regarding new construction and maintenance require-
ments.
2. The district has implemented the School Dude work order system to schedule and track rou-
tine maintenance items to include servicing, repairing and replacing equipment.
3. The district’s Facilities Master Plan was prepared by HMC Architects. The plan contains de-
tailed information regarding the district’s projects including project justification, descriptions
and costs; priority order; load distribution; staff forecast; instructional focus; and whether the
project is to be funded through local funds, the state, or both. The plan includes detailed in-
formation on infrastructure upgrades for the health and safety of students and staff.
72 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating 8
Implementation Scale:
ACCJC Standard III 73
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 8.12 - Facilities Maintenance
and Custodial - Priorities for Assignment of Routine Repair Work Orders
Professional Standard:
The college has a documented process for assigning routine repair work orders on a priority basis.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. School Dude work order reports
3. Facilities inspection log sheets
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district implemented the School Dude work order processing software and processes to
track ongoing projects and schedule routine duties.
2. The district has continued the work order prioritization process, with health and safety repairs
as the top priority for all employees. Facilities inspection log sheets have been created with
specific tasks for daily maintenance.
3. The CEO and interim director of facilities planning and operations meet weekly with other
key staff to budget, plan and prioritize facility needs.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
74 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 9.1 - Instructional Program Issues -
Plan for Attractive Landscaped Facilities
Professional Standard:
The college has developed a plan for attractively landscaped facilities.
Sources and Documentation:
1. Interviews with the CEO and the interim director of facilities planning and operations
2. Facilities Master Plan Update, July 2012
3. 2014-18 Five-Year Construction Plan
4. Site walk/observation
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district’s architect has developed conceptual landscape plans for improved campus land-
scaping. These are included in the 2012 Facilities Master Plan. The Facilities Master Plan de-
tails the overhaul of the campus infrastructure and the demolition and construction of several
structures, which are to be completed in the next few years. District staff reports that the plans
to improve campus landscaping are on hold until after the major construction has been com-
pleted. The district has developed a conceptual landscape plan that includes partial components
of the campus such as planting schemes, medians, parking lots and the interior quad area.
2. As part of the employee evaluation process, each maintenance and operations staff member
is to adopt either a campus building or grounds area. District staff reports that this adoption
program will help to identify landscaping areas that need to be addressed. The district has
a Facilities Master Plan that is augmented by funding from state and local (Measure CC)
sources. Many of the requested projects will address some of the infrastructure problems,
such as nonfunctioning sprinklers, but many replacements or upgrades to the infrastructure
cannot occur until a later phase of the Facilities Master Plan because of proposed construc-
tion and demolition of existing facilities. Until the district is able to complete the upgrades to
the utility infrastructure detailed in the Facilities Master Plan, it should maintain the existing
infrastructure to ensure the campus is functional.
3. Observed landscaping was poor due to active and ongoing construction traffic and groundwork.
ACCJC Standard III 75
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
76 ACCJC Standard III
ACCJC Standard III-B: Physical Resources
FCMAT Facilities Management Standard 10.2 - Community Use of Facilities -
Compliance with Civic Center Act for Community Use
Legal Standard:
Education Code Section 82537 establishes terms and conditions of school facility use by community
organizations, in the process requiring establishment of both “direct cost” and “fair market” rental
rates, specifying what groups have which priorities and fee schedules.
Sources and Documentation:
1. Board Policy 6700, Civic Center and Other Facilities Use, March 17, 2009
2. Administrative Regulation 6701, Civic Center and Other Facilities Use, June 16, 2009
3. Facility Fee Schedule, February 20, 2009
4. Facilities Use Application/Permit by user group category
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district determined the need to complete a comprehensive study of allowable costs and
charges for community use of facilities and completed the process by adopting Board Policy
6700, Civic Center and Other Facilities Use. The district has formally updated the facilities
usage policy that includes all administrative rules, regulations and procedures including Edu-
cation Code Section 82537 regarding the use of civic centers.
The policy and corresponding administrative regulations are accompanied by a fee schedule
that lists fees for all facilities on the campus. The policy also identifies civic center permit
categories and updated cash collection procedures.
2. The adopted policies and regulations are in accordance with Education Code Sections 82537-
82548 and are based on the appropriate fee schedule for nonprofit, youth and school activi-
ties, and other for-profit organizations.
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 9
Implementation Scale:
ACCJC Standard III 77
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard III: Resources
The institution effectively uses its human, physical, technology, and financial resources to achieve its
broad educational purposes, including stated student learning outcomes, and to improve institutional
effectiveness.
C. Technology Resources – Technology resources are used to support student learning programs
and services and to improve institutional effectiveness. Technology planning is integrated
with institutional planning.
1. The institution assures that any technology support it provides is designed to meet the needs
of learning, teaching, college-wide communications, research, and operational systems.
a. Technology services, professional support, facilities, hardware, and software are designed to
enhance the operation and effectiveness of the institution.
b. The institution provides quality training in the effective application of its information technology
to students and personnel.
c. The institution systematically plans, acquires, maintains, and upgrades or replaces technology
infrastructure and equipment to meet institutional needs.
d. The distribution and utilization of technology resources support the development, maintenance,
and enhancement of its programs and services.
2. Technology planning is integrated with institutional planning. The institution systematically
assesses the effective use of technology resources and uses the results of evaluation as the
basis for improvement.
ACCJC Standard III 1
2 ACCJC Standard III
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
C. Technology Resources
Standard to be Addressed
Financial Management Standards -- Management Information Systems
Management information systems
support users with information that is
relevant, timely and accurate. Standards
17.1 2 2 2 4 7 7 7 7
are imposed to ensure the maintainabil-
ity, compatibility, and supportability of
the various systems.
Automated systems are used to improve
accuracy, timeliness, and efficiency of
17.2 financial and reporting systems. Employees 2
receive appropriate training and supervi-
sion in the operation of the systems.
Selection of information systems technol-
ogy conforms to legal procedures specified
in the Public Contract Code. Addition-
ally, there is a process to ensure that needs
analyses, cost/benefit analyses, and financ-
17.3 ing plans are in place prior to commit- 5
ment of resources. The process facilitates
involvement by users, as well as informa-
tion services staff, to ensure that training
and support needs and costs are considered
in the acquisition process.
Major technology systems are supported
by implementation and training plans.
The cost of implementation and training
17.4 is included with other support costs in the 2
cost/benefit analyses and financing plans
supporting the acquisition of technology
systems.
Access to administrative systems is reliable
and secure. Communications pathways that
17.5 connect users with administrative systems 8
are as free of single points-of-failure as
possible, and are highly fault tolerant.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 3
Accrediting Commission for Community
April Jan. July June Jan. July June April
and Junior Colleges (ACCJC) Standard 2007 2008 2008 2009 2010 2010 2012 2013
III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Hardware and software purchases conform
to existing technology standards. Stan-
dards for copiers, printers, fax machines,
networking equipment, and all other
technology assets are defined and enforced
to increase standardization and decrease
support costs. Requisitions that contain
17.6 hardware or software items are forwarded 4
to the technology department for approval
prior to being converted to purchase orders.
Requisitions for non-standard technology
items are approved by the Management
Information Systems Division unless the
user is informed that district support for
non-standard items will not be available.
Computers are replaced on a schedule
17.7 1 1 1 6 8 8 8 8
based on hardware specifications.
Network standards, such as the follow-
ing, are being followed by the college: 1) A
stable firewall is used with separate DMZ
and “inside” network; 2) the college follows
EIA/TIA 568-B for all network cabling; 3)
A Web content filter is used for all outbound
Internet access; 4) The college uses an e-mail
spam filter for all inbound e-mail; 5) Ad-
17.8 ministrative and academic network traffic is 6
kept separate; 6) Switches and network hubs
are installed, and the college ensures that
switches support certain features; 7) Login
banners are added to all network elements
that will support them; 8) The college has
transitioned from all non-TCP/IP protocols;
and 9) The college uses a VPN for any access
to the internal network from the outside.
Administrative system users are ade-
quately trained in the use of administra-
17.9 tive systems and receive periodic train- 1 2 2 6 7 7 7 8
ing updates to ensure that they remain
aware of system changes and capabilities.
Business office computers, computer
screens, operating systems and software
17.10 8
applications used for administrative system
access are kept up to date.
The standards in bold text are the identified subset of standards for ongoing reviews.
4 ACCJC Standard III
ACCJC Standard III-C: Technology Resources
FCMAT Financial Management Standard 17.1 – Management Information Systems
Professional Standard:
Management information systems support users with information that is relevant, timely and ac-
curate. Standards are imposed to ensure the maintainability, compatibility, and supportability of the
various systems.
Sources and Documentation:
1. Interview with the El Camino CCD director of information technology services
2. Interview with the El Camino CCD manager of MIS, assigned to Compton CCD
3. Interview with the information systems engineer
4. El Camino College Compton Community Educational Center Technology Plan 2011-2016,
June 13, 2012
5. Visual inspection of the new data center
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD has an established Technology Plan for the period 2011 through 2016. The
purpose of the plan is to establish technology guidelines to assist the district in supporting and
enhancing technology. During its development, the state of technology was examined in the
Compton CCD and a plan developed for enhancement over five years to ensure an adequate,
reliable technology infrastructure and equipment. However, increased use of technology, out-
dated software applications, hardware limitations, and budgetary challenges all make the cur-
rent version of this plan obsolete. The district is evaluating the technology plan and identifying
necessary updates to the current technology as well as what is needed to incorporate and sup-
port advancing technologies, including wireless connectivity and user-provided devices.
2. The district has worked diligently to stabilize its technology infrastructure over the last several
years to ensure that its network is reliable. During prior review periods, the district was experi-
encing serious challenges with failing cabling and network infrastructure, outdated equipment,
lack of equipment standardization, and extensive delays in equipment replacement. This placed
the district in a state of emergency regarding technology, with technology staff addressing
failures as they arose during the project. Since FCMAT’s last review period, the district has
completed construction of the new dedicated network server room located in the Management
Information Systems (MIS) Department; has replaced core MIS equipment, including servers
and network components; and has migrated to the new system. The new dedicated server room
provides adequate space for district needs. The district is in the process of upgrading the fiber
connectivity, which is a core component of technology infrastructure. Redundant cooling sys-
tems and generator power backup has also been installed, ensuring the district’s ability to avoid
disruptions in service and properly protect the equipment. Access controls to the server room
have been installed, preventing unauthorized access to the servers.
3. The district is now focused on updating lines of connectivity. During FCMAT’s visit, the in-
frastructure project construction was in progress, which includes updated fiber connectivity
to the campus buildings. The district has not yet begun to refurbish the rest of the technology
ACCJC Standard III 5
center as organized workspace for technology staff. It is unknown how long it will take for
the district to identify and commit available resources to this project.
4. The district manages a parallel system with routine backups of network data. A tape backup
is removed weekly and held at an offsite storage site. If the system requires restoration, one
year of data from the beginning of the month can be recovered from tape backups. However,
backup procedures are not documented. The MIS Department should create written opera-
tional policies and procedures documenting essential duties of the technology services staff.
5. Administration and oversight of technology services continue to be provided by an El Cami-
no CCD staff member assigned to the Compton campus as the manager of MIS. The position
is paid by the Compton CCD and collaborates with the El Camino CCD director of informa-
tion technology services. For Compton to progress in the technology standards, the admin-
istration and management of technology services should report directly within the organiza-
tional structure of Compton CCD. The district is evaluating the viability of establishing an
independent administrative organizational structure for technology services, which would
include a full-time director position.
6. All technology support positions are Compton CCD employees. The manager of MIS is
working to build capacity in Compton CCD through training and dissemination of informa-
tion to the technology team and by working to implement and strengthen operational pro-
cedures that support best practices. The manager continues to push routine responsibility to
the rest of the team while working to keep pace with the standards and expectations of El
Camino CCD.
7. The district has a Technology Committee made up of 12 members including faculty, staff and
students. Interviews indicated that the committee meets monthly and prepares minutes. The
review team requested but was not provided this information for the current review period.
Interviews indicated that over the last year the committee has recognized its broader mission,
beyond providing a venue for expressing problems and/or developing wish lists. The com-
mittee participated in an informal process of evaluating the prior technology plan and cost
matrix, which was provided to the Planning and Budget Committee for consideration.
8. The Compton CCD initially purchased its Datatel Colleague financial system in 2004 and
lost accreditation shortly after contracting for installation of the system. Subsequently, ad-
ministrators from the El Camino CCD negotiated with Datatel to suspend selected modules
of the Compton license agreement with Datatel. At the same time, users began to use the
separate installation of Colleague hosted by the El Camino CCD. Accreditation requirements
prohibit return of the student and academic modules of Datatel to the Compton Center until
the campus has reacquired independent accreditation. However, there is no such limitation on
the return of the financial system modules. The district should negotiate directly with Datatel
to determine the costs associated with bringing the financial system modules back online.
9. Users in the Compton CCD business office must enter financial transaction data into two dis-
tinctly separate systems: Datatel (hosted at the El Camino CCD) and PeopleSoft (hosted at
LACOE). To address problems associated with duplicate data input, users at the El Camino
CCD have developed applications that allow data entered into the Datatel system to be electron-
6 ACCJC Standard III
ically uploaded to PeopleSoft. The interface application cannot simply be implemented in the
Compton CCD Colleague system because of fundamental version differences of the Compton
CCD and El Camino CCD Colleague systems. However, the El Camino CCD interfaces can be
investigated as a model of how data input requirements could be reduced if proper system in-
terfaces were programmed and developed. This should continue as a priority of the CBO as the
financial team gains a better understanding of the functionality of each system.
The manager of MIS should assess the interface applications developed to automate data
sharing between the El Camino CCD Datatel Colleague and LACOE PeopleSoft systems to
determine if advantages could be achieved by developing similar interface applications for
the Compton CCD Datatel Colleague and LACOE PeopleSoft systems.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 7
ACCJC Standard III-C: Technology Resources
FCMAT Financial Management Standard 17.7 – Management Information Systems
Professional Standard:
Computers are replaced on a schedule based on hardware specifications.
Sources and Documentation:
1. Interview with the El Camino CCD director of information technology services
2. Interview with the El Camino CCD manager of MIS, assigned to Compton CCD
3. Interview with the information systems engineer
4. El Camino College Compton Community Educational Center Technology Plan 2011-2016,
June 13, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton Community Educational Center Technology Plan provides a plan for address-
ing campuswide hardware and software needs. The technology team has been working with
departments to determine equipment needs and establish procedures necessary to standardize
equipment purchases. Procedures are in place to ensure that MIS provides specifications and
signs off on equipment replacement purchases. Deans work directly with the MIS Depart-
ment to determine needs in advance of purchases.
2. Interviews indicated that the district has a large inventory of end user equipment that requires
replacement. Approximately 70-80% of deployed technology has operating systems that
Microsoft will no longer support. These machines are not expected to fail in the short term;
however, the ability to efficiently support them and secure parts necessary to service them is
expected to become increasingly difficult. Many of these machines may not run new or up-
dated software applications. The technology team is identifying and evaluating all end user
devices provided and supported by the Compton CCD. This requires a team member to phys-
ically inspect each machine and gather pertinent information so a technician can develop a
quality inventory and replacement plan. Physical inspection of every machine districtwide is
a very time consuming approach to obtaining this data. The MIS Department has identified a
software application that would allow remote access to much of this data from each machine
that is connected to the district’s network. In addition to improving asset tracking capabilities,
the application offers imaging capabilities for configuring new computers and reconfiguring
older systems when necessary. Applications of this nature may improve staff efficiency in
supporting and deploying equipment. The technology team indicated that this tool is essential
to efficiently provide ongoing support. The district should consider performing an evaluation
and cost benefit analysis of acquiring the application.
3. Identifying a stable and reliable funding source is among the greater challenges in address-
ing equipment replacement needs. Interviews indicated that the district expects to designate
funds in the 2013-14 proposed budget to support ongoing technology improvements. How-
ever, the district should identify a stable and reliable funding source to meet the technology
equipment replacement cycle and address new and ongoing needs that result from the acqui-
sition of new equipment and completion of the new server room.
8 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 6
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard III 9
ACCJC Standard III-C: Technology Resources
FCMAT Financial Management Standard 17.9 – Management Information Systems
Professional Standard:
Administrative system users are adequately trained in the use of administrative systems and receive
periodic training updates to ensure that they remain aware of system changes and capabilities.
Sources and Documentation:
1. Interview with the El Camino CCD director of information technology services
2. Interview with the El Camino CCD manager of MIS, assigned to Compton CCD
3. Interview with the information systems engineer
4. El Camino College Compton Community Educational Center Technology Plan 2011-2016,
June 13, 2012
5. Various communications regarding technology training opportunities
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues to support staff development for technology through training session
offerings in conjunction with the El Camino CCD. This offers a more effective delivery of
instruction and a greater variety of training offerings. Ongoing staff training opportunities
will be necessary as applications are upgraded throughout the organization.
2. The district should continue assessing the needs of its administrative system users and focus
on developing and promoting training programs that address those needs. Although comput-
er-based training-on-demand options have been universally accepted, the specific training
needs of individual staff members should be a focus of improvement for this standard. The
district should ensure that ongoing communications to employees are systematic to continue
an awareness of the availability of training opportunities.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
10 ACCJC Standard III
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard III: Resources
The institution effectively uses its human, physical, technology, and financial resources to achieve its
broad educational purposes, including stated student learning outcomes, and to improve institutional
effectiveness.
D. Financial Resources – Financial resources are sufficient to support student learning
programs and services and to improve institutional effectiveness. The distribution of
resources supports the development, maintenance, and enhancement of programs and
services. The institution plans and manages its financial affairs with integrity and in
a manner that ensures financial stability. The level of financial resources provides a
reasonable expectation of both short-term and long-term financial solvency. Financial
resources planning is integrated with institutional planning.
1. The institution relies upon its mission and goals as the foundation for financial planning.
a. Financial planning is integrated with and supports all institutional planning.
b. Institutional planning reflects realistic assessment of financial resource availability, devel-
opment of financial resources, partnerships, and expenditure requirements.
c. When making short-range financial plans, the institution considers its long-range finan-
cial priorities to assure financial stability. The institution clearly identifies and plans for
payment of liabilities and future obligations.
d. The institution clearly defines and follows its guidelines and processes for financial plan-
ning and budget development, with all constituencies having appropriate opportunities to
participate in the development of institutional plans and budgets.
2. To assure the financial integrity of the institution and responsible use of financial resources,
the financial management system has appropriate control mechanisms and widely dissemi-
nates dependable and timely information for sound financial decision making.
a. Financial documents, including the budget and independent audit, reflect appropriate al-
location and use of financial resources to support student learning programs and services.
Institutional responses to external audit findings are comprehensive, timely, and communi-
cated appropriately.
b. Appropriate financial information is provided throughout the institution.
c. The institution has sufficient cash flow and reserves to maintain stability, strategies for ap-
propriate risk management, and realistic plans to meet financial emergencies and unfore-
seen occurrences.
d. The institution practices effective oversight of finances, including management of financial
aid, grants, externally funded programs, contractual relationships, auxiliary organizations
or foundations, and institutional investments and asset.
e. All financial resources, including those from auxiliary activities, fund-raising efforts, and grants
are used with integrity in a manner consistent with the mission and goals of the institution.
f. Contractual agreements with external entities are consistent with the mission and goals of
the institution, governed by institutional policies, and contain appropriate provisions to
maintain the integrity of the institution.
ACCJC Standard III 11
g. The institution regularly evaluates its financial management processes, and the results of
the evaluation are used to improve financial management systems.
3. The institution systematically assesses the effective use of financial resources and uses the
results of the evaluation as the basis for improvement.
12 ACCJC Standard III
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
D. Financial Resources
Standard to be Addressed
Financial Management Standards -- Internal Control Environment
Integrity and ethical behavior is the
product of the college’s ethical and be-
havioral standards, how they are com-
municated, and how they are reinforced
1.1 1 2 4 5 6 5 5 6
in practice. All management-level per-
sonnel exhibit high integrity and ethical
values in carrying out their responsibili-
ties and directing the work of others.
The organizational structure clearly
identifies key areas of authority and re-
1.4 1 2 2 5 6 6 6 7
sponsibility. Reporting lines are clearly
identified and logical within each area.
Management has the ability to evaluate job
1.5 requirements and match the requirements 2
to the employee’s skills.
The college has procedures for recruiting
1.6 capable financial management and staff and 2
hiring competent people.
All employees are evaluated on per-
formance at least annually by a man-
agement-level employee knowledgeable
about their work product. The evaluation
1.7 criteria are clearly communicated and, 3 4 4 6 6 7 7 7
to the extent possible, measurable. The
evaluation includes a follow-up on prior
performance issues and establishes goals
to improve future performance.
Top management sets the tone and
establishes the environment. Therefore,
1.8 0 0 4 5 5 5 1 5
appropriate measures are implemented
to discourage and detect fraud.
ACCJC Standard III 13
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards -- Inter- and Intra-Departmental Communications
The business and operations depart-
ments communicate regularly with
internal staff and all user departments
on their responsibilities for accounting
procedures and internal controls. The
communications are written whenever
possible, particularly when they (1) af-
fect many staff or user groups, (2) are
2.1 1 2 4 6 7 8 6 7
issues of high importance, or (3) reflect a
change in procedures. Procedures manu-
als are necessary for the communication
of responsibilities. The departments also
are responsive to user department needs,
thus encouraging a free exchange of
information between the two (excluding
items of a confidential nature).
The financial departments communicate
regularly with the Governing Board
and community on the status of college
finances and the financial impact of pro-
posed expenditure decisions. The com-
2.2 1 2 2 5 6 7 3 5
munications are written whenever pos-
sible, particularly when they affect many
community members, are issues of high
importance to the college and board, or
reflect a change in policy.
The Governing Board is engaged in un-
derstanding globally the fiscal status of
2.3 the college, both current and as projected. 1
The board prioritizes college fiscal issues
among the top discussion items.
The college has formal policies and
procedures that provide a mechanism
for individuals to report illegal acts,
2.4 1 1 3 5 5 5 3 5
establish to whom illegal acts should be
reported, and provide a formal investiga-
tive process.
Documents developed by the financial
departments for distribution to the
2.5 3 3 3 4 7 8 7 7
board, staff and community are easily
understood.
14 ACCJC Standard III
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards -- Staff Professional Development
The college has developed and uses a
professional development plan for training
business staff. The plan includes the input
of business office supervisors and manag-
3.1 ers, and, at a minimum, identifies appro- 2
priate programs office-wide. At best, each
individual staff and management employee
has a plan designed to meet their individual
professional development needs.
The college develops and uses a profes-
sional development plan for the in-service
training of department staff by business
3.2 staff on relevant business procedures and 0
internal controls. The plan includes the
input of the business office and the depart-
ments/divisions and is updated annually.
Financial Management Standards -- Internal Audit
The Governing Board has adopted poli-
cies establishing an internal audit func-
4.1 0 0 4 8 6 6 1 3
tion that reports directly to the president
or Governing Board.
Internal audit functions are designed into
the organizational structure of the college.
These functions include periodic internal
4.2 0
audits of areas at high risk for non-compli-
ance with laws and regulations and/or at
high risk for monetary loss.
Qualified staff members are assigned to
4.3 conduct internal audits and are supervised 0
by an independent body.
Internal audit findings are reported on a
timely basis to the Governing Board and
4.4 administration, as appropriate. Manage- 0 0 1 3 5 5 0 3
ment then takes timely action to follow
up and resolve audit findings.
ACCJC Standard III 15
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards -- Budget Development Process (Policy)
The budget development process re-
quires a policy-oriented focus by the
Governing Board to develop an expendi-
ture plan that fulfills the college’s goals
and objectives. The Governing Board
5.1 focuses on expenditure standards and 1 1 2 4 7 8 3 5
formulas that meet the college’s goals.
The Governing Board avoids specific
line-item focus, but directs staff to de-
sign an entire expenditure plan focusing
on student and college needs.
The budget development process includes
5.2 input from staff, administrators, board and 1
community.
Policies and regulations exist regarding
5.3 1 1 0 6 8 8 8 8
budget development and monitoring.
The college has a clear process to analyze
resources and allocations to ensure that
5.4 they are aligned with strategic planning 0 0 1 5 7 7 4 4
objectives and that the budget reflects
college priorities.
The college has policies to facilitate devel-
opment of a budget that is understandable,
5.5 meaningful, reflective of college priorities, 0
and balanced in terms of revenues and
expenditures.
Categorical funds are an integral part
of the budget process and have been
integrated into the entire budget devel-
opment. The revenues and expenditures
for categorical programs are reviewed
and evaluated in the same manner as
5.6 0 0 1 5 7 7 4 4
unrestricted General Fund revenues and
expenditures. Categorical program de-
velopment is integrated with the college’s
goals and used to respond to specific
college student needs to support student
learning outcomes.
16 ACCJC Standard III
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The college has the ability to accurately
reflect its net ending balance throughout the
budget monitoring process. The 311A and
311Q reports provide valid updates of the
5.7 college’s net ending balance. The college 0
has tools and processes that ensure that
there is an early warning of any discrepan-
cies between the budget projections and
actual revenues or expenditures.
The college utilizes formulas for allocating
funds to departments/divisions. This can
include staffing ratios, supply allocations,
5.8 0
etc. These formulas are in line with the
board’s goals and directions, and are not
overridden.
Financial Management Standards -- Budget Development Process (Technical)
The Budget Office has a technical pro-
cess to build the preliminary budget
amounts that includes: the forecast of
revenues, the verification and projec-
tion of expenditures, the identification of
known carryovers and accruals and the
6.1 0 1 1 5 6 6 3 4
inclusion of concluded expenditure plans.
The process clearly identifies the sources
and uses of funds. Reasonable FTES and
COLA estimates are used when planning
and budgeting. The same process is ap-
plied to all funds.
An adopted budget calendar exists that
meets legal and management requirements.
6.2 At a minimum the calendar identifies statu- 0
tory due dates and major budget develop-
ment activities.
Standardized budget worksheets are used
6.3 to communicate budget requests, budget al- 0
locations, formulas applied and guidelines.
Financial Management – Budget Adoption, Reporting, and Audits
The college adopts its annual budget and
7.1 files it with the Chancellor’s Office within 0
the statutory time lines.
ACCJC Standard III 17
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The college has procedures that provide for
the development and submission of a col-
7.3 lege budget and interim reports that adhere 5
to criteria and standards and are approved
by the Chancellor’s Office.
The college completes and files its interim
7.4 budget reports within the statutory dead- 2
lines.
The quarterly fiscal status reports show
an accurate projection of the ending
7.5 fund balance. Material differences are 3 3 1 3 6 6 4 4
presented to the Governing Board with
detailed explanations.
The college has complied with the Govern-
mental Accounting Standard No. 34 (GASB
34) which requires the college to develop
7.6 policies and procedures and report in the 8
annual financial reports on the modified
accrual basis of accounting and the accrual
basis of accounting.
The college has arranged for an annual
7.7 audit (single audit) within the deadlines 8
established.
Financial Management Standards -- Budget Monitoring
All purchase orders are properly encum-
8.1 1
bered against the budget until payment.
There are budget monitoring controls,
such as periodic reports, to alert depart-
ment and site managers of the poten-
8.2 0 3 3 4 6 7 5 5
tial for over-expenditure of budgeted
amounts. Revenue and expenditures are
forecast and verified monthly.
Budget revisions are made on a regular
8.4 basis and occur per established procedures, 0
and are approved by the Governing Board.
The college uses an effective position
control system that tracks personnel al-
locations and expenditures. The position
8.5 1 1 1 3 7 8 6 6
control system effectively establishes
checks and balances between personnel
decisions and budgeted appropriations.
18 ACCJC Standard III
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards -- Budget Communications
The college budget is a clear manifesta-
tion of college policies and is presented in
9.1 0
a manner that facilitates communication of
those policies.
The college budget clearly identifies one-
9.2 0 1 1 2 6 7 8 9
time sources and uses of funds.
Financial Management Standards -- Attendance Accounting
An accurate record of enrollment and
11.1 5 5 5 5 5 6 5 6
attendance is maintained.
Students are enrolled and attendance
reports are completed by staff and entered
11.3 3
into the student information system in an
efficient, accurate, and timely manner.
Procedures are in place to ensure that
enrollment and attendance accounting
and reporting requirements are met for
11.5 weekly student contact hours (WSCH), 3 5 5 5 5 6 3 5
daily student contact hours (DSCH),
credit, non-credit, high school concur-
rent enrollment, and positive attendance.
Financial Management Standards -- Accounting, Purchasing and Warehousing
The college adheres to the Budget and
Accounting Manual (BAM) and Generally
12.1 Accepted Accounting Principles (GAAP) 1
as required by Education Code Section
84030.
The college timely and accurately re-
cords all information regarding financial
activity (unrestricted and restricted)
for all programs. Generally Accepted
Accounting Principles (GAAP) requires
that for financial reporting to serve the
12.2 2 3 3 3 5 7 3 5
needs of the users, it must be reliable
and timely. Therefore, the timely and
accurate recording of the underlying
transactions (revenue and expenditures)
is an essential function of the college’s
financial management.
ACCJC Standard III 19
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The college forecasts its revenues and
expenditures and verifies those projec-
tions monthly to adequately manage its
cash. In addition, the college reconciles
its cash to bank statements and reports
12.3 2 2 2 2 5 6 5 5
from the county treasurer monthly. Stan-
dard accounting practice dictates that, to
ensure that all cash receipts are depos-
ited timely and recorded properly, cash
is reconciled to bank statements monthly.
The college’s payroll procedures are in
compliance with established require-
ments. (Education Code Section 85241)
12.4 Standard accounting practice dictates 1 5 5 5 7 7 5 5
that the college implements procedures
to ensure the timely and accurate pro-
cessing of payroll.
Standard accounting practice dictates
that the accounting work is properly
supervised and work reviewed to ensure
12.5 1 2 2 4 5 6 3 5
that transactions are recorded timely
and accurately, and allow the prepara-
tion of periodic financial statements.
Categorical programs, either through
specific program requirements or through
general cost principals, require that entities
12.6 2
receiving such funds must have an ad-
equate system to account for those revenues
and related expenditures.
Generally accepted accounting practices
dictate that, to ensure accurate recording
of transactions, the college have standard
procedures for closing its books at fiscal
12.7 1 1 0 2 4 7 3 5
year-end. The college’s year-end clos-
ing procedures should comply with the
procedures and requirements established
by the Chancellor’s Office.
20 ACCJC Standard III
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The college complies with the bidding
requirements of Public Contract Code
Section 20111. Standard accounting prac-
tice dictates that the college have adequate
purchasing and warehousing procedures to
ensure that only properly authorized pur-
12.8 4
chases are made, that authorized purchases
are made consistent with college policies
and management direction, that invento-
ries are safeguarded, and that purchases
and inventories are timely and accurately
recorded.
The college has documented procedures
for the receipt, expenditure and monitor-
ing of all construction-related activities.
12.9 Included in the procedures are specific 2 2 2 4 6 7 4 6
requirements for the approval and pay-
ment of all construction-related expendi-
tures.
The accounting system has an appropriate
12.10 level of controls to prevent and detect er- 1
rors and irregularities.
The college has implemented an account
code structure that enables the standard
12.11 financial reporting required by the state and 4
ensures that the college is in compliance
with guidelines.
Financial Management Standards – Student Body Funds
The Governing Board adopts policies
and procedures to ensure compliance re-
13.1 garding how student body organizations 3 3 4 5 7 9 5 5
deposit, invest, spend, raise and audit
student body funds.
Proper supervision of all student body
funds is provided by the Board. This
includes establishing responsibilities for
managing and overseeing the activities and
13.2 2
funds of student organizations, including
providing procedures for the proper han-
dling, recording and reporting of revenues
and expenditures.
ACCJC Standard III 21
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The college provides training and guidance
to college personnel and students on the
13.3 1
policies and procedures governing student
body accounts.
Monitoring is performed by the Busi-
ness Services Office to provide adequate
13.4 1 1 2 6 8 9 5 5
oversight of student funds and to ensure
proper handling and reporting.
Financial Management Standards -- Multi Year Financial Projections
The college annually provides a multi-
year revenue and expenditure projection
for all funds of the college. Projected
14.2 0 0 0 1 5 7 2 4
fund balance reserves are disclosed. The
assumptions for revenues and expendi-
tures are reasonable and supportable.
Multiyear financial projections are prepared
for use in the decision-making process,
14.3 0
especially whenever a significant multiyear
expenditure commitment is contemplated.
Assumptions used in developing multiyear
14.4 projections are based on the most accurate 0
information available.
Financial Management Standards -- Long-Term Debt Obligations
The college complies with public disclo-
sure laws of fiscal obligations related to
15.1 health and welfare benefits for retirees, 0 5 5 5 6 7 8 8
self-insured workers’ compensation, and
collective bargaining agreements.
When authorized, the college uses only
non-voter approved, long-term financing
such as certificates of participation (COPS),
revenue bonds, and lease-purchase agree-
15.2 ments (capital leases) to address capital 8
needs, and not operations. Further, the gen-
eral fund is used to finance current school
operations, and in general is not used to pay
for these types of long-term commitments.
22 ACCJC Standard III
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
For long-term liabilities/debt service, the
college prepares debt service schedules and
identifies the dedicated funding sources
to make those debt service payments. The
college projects cash receipts from the
dedicated revenue sources to ensure that it
15.3 will have sufficient funds to make periodic 8
debt payments. Cash flow projections are
continually monitored to ensure that any
variances from the projections are identi-
fied as early as possible to allow the district
sufficient time to take appropriate measures
or identify alternative funding sources.
The college has developed and uses a finan-
cial plan to ensure that ongoing unfunded
liabilities from employee benefits are rec-
15.4 ognized as a liability of the college. A plan 0
has been established for funding retiree
health benefit costs as the obligations are
incurred.
Financial Management Standards -- Impact of Collective Bargaining
The college has developed parameters
and guidelines for collective bargaining
that ensure that the collective bargain-
ing agreement is not an impediment to
efficiency of college operations. At least
annually, collective bargaining agree-
ments are analyzed by management to
identify those characteristics that are im-
pediments to effective delivery of college
operations. The college identifies those
issues for consideration by the Govern-
16.1 8 8 8 8 8 8 8 8
ing Board. The Governing Board, in the
development of its guidelines for collec-
tive bargaining, considers the impact
on college operations of current collec-
tive bargaining language, and proposes
amendments to contract language as
appropriate to ensure effective and ef-
ficient college delivery. Governing Board
parameters are provided in a confiden-
tial environment, reflective of the obliga-
tions of a closed executive board session.
ACCJC Standard III 23
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The Governing Board ensures that any
guideline developed for collective bargain-
ing is fiscally aligned with the instructional
and fiscal goals on a multiyear basis. The
President ensures that the college has a
formal process in which collective bargain-
ing multiyear costs are identified for the
Governing Board, and those expenditure
changes are identified and implemented as
necessary prior to any imposition of new
collective bargaining obligations. The Gov-
16.2 erning Board ensures that costs and pro- 0
jected college revenues and expenditures
are validated on a multiyear basis so that
the fiscal issues faced by the college are not
worsened by bargaining settlements. The
public is informed about budget reductions
that will be required for a bargaining agree-
ment prior to any contract acceptance by
the Governing Board. The public is noti-
fied of the provisions of the final proposed
bargaining settlement and is provided with
an opportunity to comment.
Financial Management Standards -- Maintenance and Operations Fiscal Controls
The college has a comprehensive risk-
management program that monitors the
various aspects of risk management in-
18.1 4 5 6 6 6 6 8 9
cluding workers’ compensation, property
and liability insurance, and maintains
the financial well-being of the college.
The college has a work order system
that tracks all maintenance requests, the
18.2 2 2 3 5 5 7 7 7
worker assigned, dates of completion, la-
bor time spent and the cost of materials.
The college controls the use of facilities
18.3 and charges fees for usage in accordance 5 5 4 5 7 7 7 9
with college policy.
24 ACCJC Standard III
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
The Maintenance Department follows
standard college purchasing protocols.
Open purchase orders may be used if
18.4 5 5 4 4 7 6 7 8
controlled by limiting the employees
authorized to make the purchase and the
amount.
Materials and equipment/tools inven-
tory are safeguarded from loss through
18.5 5 5 6 6 6 6 4 4
appropriate physical and accounting
controls.
College-owned vehicles are used only for
18.6 college purposes. Fuel is inventoried and 5
controlled as to use.
Capital equipment and furniture is tagged
18.8 as college-owned property and inventoried 1
at least annually.
The college adheres to bid and force ac-
count requirements found in the Public
Contract Code (Sections 20111 and 20114).
These requirements include formal bids
18.9 for materials, equipment and maintenance 7
projects that exceed $50,000; capital proj-
ects of $15,000 or more; and labor when
the job exceeds 750 hours or the materials
exceed $21,000.
Standard accounting practices dictate
that the college has adequate purchasing
and contract controls to ensure that only
properly authorized purchases are made
and independent contracts approved, and
that authorized purchases and independent
18.10 4
contracts are made consistent with col-
lege policies, procedures, and management
direction. In addition, appropriate levels of
signature authorization are maintained to
prevent or discourage inappropriate pur-
chases or contract awards.
Financial Management Standards – Food Service Fiscal Controls
The college operates the food service pro-
19.1 grams in accordance with applicable laws 3
and regulations.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard III 25
Accrediting Commission for April Jan. July June Jan. July June April
Community and Junior Colleges 2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard III: Resources Rating Rating Rating Rating Rating Rating Rating Rating
Financial Management Standards – State-Mandated Cost
The college has procedures that pro-
vide for the appropriate oversight and
management of mandated cost claim
reimbursement filing. Appropriate
procedures cover: the identification of
changes to existing mandates; training
21.1 staff regarding the appropriate collec- 2 2 3 4 7 7 8 7
tion and submission of data to support
the filing of the mandated costs claims;
forms, formats, and time lines for re-
porting mandated cost information; and
review of data and preparation of the
actual claims.
The standards in bold text are the identified subset of standards for ongoing reviews.
26 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 1.1 – Internal Control Environment
Professional Standard:
Integrity and ethical behavior is the product of the college’s ethical and behavioral standards, how
they are communicated, and how they are reinforced in practice. All management-level personnel
exhibit high integrity and ethical values in carrying out their responsibilities and directing the work
of others.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Interview with the special trustee
4. Interview with the El Camino CCD president
5. Interview with the El Camino CCD vice president of administrative services
6. Interviews with board members and management/supervisory staff
7. Board Policy 2710, Conflict of Interest, December 15, 2009
8. Administrative Regulation 2711, Conflict of Interest Disclosure, December 15, 2009
9. Form 700 list for January 1, 2012 through December 31, 2012
10. Form 700 filings for January 1, 2012 through December 31, 2012
11. Board Policy 2715, Code of Ethics and Standards of Practice, November 16, 2010
12. Board retreat ethics training presentation, October 26, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. In December 2009, the state special trustee approved Board Policy (BP) 2710, Conflict of
Interest, and Administrative Regulation (AR) 2711, Conflict of Interest Disclosure. BP 2710
addresses the limitations and disclosure requirements of board members and other district
employees where personal activity or financial interest has or may have an effect that is in
conflict or incompatible with his or her duties as an officer of the district. AR 2711 describes
in detail the general requirements, designated employee positions, disclosure categories, gifts
and honoraria. Each section of the AR places the highest priority on honesty and integrity in
all public and personal relationships by board members and senior administrators, and further
extends to construction consultants. Approval and implementation of this policy demonstrates
the district’s ongoing commitment to enhance its ethical and behavioral standards and pro-
vides a strong basis for an internal control environment that is conducive to preventing fraud,
misappropriation of funds and other illegal activities.
2. AR 2711 lists all designated positions required to file a Statement of Economic Interests,
Form 700, and describes the roles and responsibilities of the district and the employee. The
district has implemented procedures to ensure that designated employees, including public
officials, file statements of financial interest in accordance with Government Code Sec-
tion 1090. FCMAT reviewed Form 700 statements prepared for the period January 1, 2012
through December 31, 2012. Inquiries with board members and employees noted an aware-
ness of purpose and duty to complete Form 700 routinely. Two of the completed forms were
prepared for employees who had separated employment with the district prior to the filing
ACCJC Standard III 27
due date and had been mailed to the former staff member on April 24, 2013; therefore, no
signatures were on the forms reviewed by FCMAT. The district should routinely review the
list of designated positions included in AR 2711 to ensure that all necessary positions are in-
cluded and update the regulation as necessary. The district should also ensure that forms are
completed timely by employees in designated positions when they resign.
3. The Compton CCD special trustee and CEO continue the practices implemented during the
last review period to ensure organizational expectations are communicated regularly to em-
ployees. Routine communications take place in many forms including newsletters, depart-
ment and committee meetings. Staff members widely acknowledge these communication
methods. Consistent integrity and ethical behaviors by management set the expectation, pro-
vide the necessary leadership for all staff and create an environment of high ethical and moral
value. Staff members speak highly of the leadership’s efforts to communicate and involve
them in the status of events.
4. The development, implementation and update of policies and regulations continue to lag as
management focuses on developing operational procedures for technical staff. The district
should ensure that board policies and administrative regulations are reviewed, updated, de-
veloped and implemented as a component of this work and ensure staff are informed and
trained in all areas of change that affect their areas of responsibility. The development of op-
erational procedures indicate continued progress in the outward attitude of management and
will strengthen policy effectiveness. Continued efforts demonstrating management’s expec-
tation that staff are properly trained help to ensure the implementation of new policy and/or
subsequent revisions.
5. It was widely reported in interviews that the leadership of the current CEO and CBO pro-
vides a sense of stability. Staff clearly understand the administration’s expectations of them,
and management-level personnel are actively involved in directing and overseeing the work
of staff in the Business Services Department.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 6
Implementation Scale:
28 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 1.4 – Internal Control Environment
Professional Standard:
The organizational structure clearly identifies key areas of authority and responsibility. Reporting
lines are clearly identified and logical within each area.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Interview with the special trustee
4. Interview with the El Camino CCD president
5. Interview with the El Camino CCD vice president of administrative services
6. Board Policy 3100, Organizational Structure, November 17, 2009
7. Administrative Regulation 3101, Management Organization Chart, March 15, 2010
8. CCCD/ECCD CEC Organizational Chart, April 11, 2013
9. Business Services Organizational Chart, January 17, 2013
10. Maintenance and Operations Organizational Chart, January 17, 2013
11. Management Information Systems Organizational Chart, January 17, 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. An organizational structure that provides clearly defined lines of authority significantly
enhances internal control. Accountability is a critical component of an effective control
environment and is established through organizational structure and effective communica-
tion. Assembly Bill (AB) 318 set forth the parameters of the partnership between El Camino
CCD and Compton CCD and created the Compton Center. The El Camino College Compton
Center operates as a center of El Camino Community College and, under the partnership,
provides accredited courses for instruction. El Camino CCD provides oversight and manage-
ment of the instructional programs and supporting services. In March 2010, the board/special
trustee approved AR 3101, Management Organization Chart. AR 3101 established a senior
management group composed of the El Camino CC president, state special trustee, Compton
Center vice president and Compton CCD CEO. The management organizational chart delin-
eates the lines of authority and reporting to the Compton CCD CEO and El Camino CCD that
include the following:
• Director of Facilities Planning (Compton CCD with oversight by the CEO)
• Chief Business Officer (Compton CCD with oversight by CEO)
• Dean of Human Resources (Compton CCD with oversight by CEO)
• Deans of Academic Programs, Career-Technical Education, Human Resources and Student
Services (El Camino CCD with oversight by Compton Center VP)
The district recently hired an interim director of facilities planning and operations, which re-
ports to the CBO. The district intends to make this a permanent position and has eliminated
the manager of facilities, maintenance and operations position included in AR 3101, dated
March 15, 2010. This same chart lists a director of facilities planning position that reports
ACCJC Standard III 29
directly to the CEO. If the interim director of facilities planning and operations position is
made permanent, the district should update the organization chart in AR 3101.
2. Each division in the AR 3101 organization chart is subdivided into its supporting depart-
ments. This chart provides direction for management and support staff by documenting clear
lines of authority. However, the organization chart does not include the Management Infor-
mation Systems Department. Although it was noted during interviews that the CBO meets
with the department regularly, and the CCCD/ECCD CEC Organizational Chart (April 11,
2013) provided by the district indicates that the manager of MIS reports to the CBO, the es-
tablished reporting lines for this department are unclear from the organization chart included
in AR 3101. The chart should be reviewed and updated to reflect any changes.
3. During FCMAT interviews it was clear that an appropriate chain of command has been estab-
lished and implemented. Employees understand the avenues for communication available to
them and are respectful of the administration at all levels.
4. The district has regained momentum in establishing a strong, consistent leadership team in
the Business Services Department. The retention of a permanent CBO is instrumental with
regard to departmental structure and leadership, technical guidance and professional devel-
opment training. This position is essential to the implementation of systems, procedures and
oversight of daily operations that ensure accurate and timely processing of financial informa-
tion. The renewed stability in this leadership role has increased the structure and guidance to
staff necessary to effectively establish and maintain a high quality of services from the Busi-
ness Services Department.
5. Under the governance structure and partnership agreement, El Camino CCD continues to
provide oversight to the Compton Center as necessary to help ensure Compton CCD’s fis-
cal recovery, and will assist with compliance efforts and progress toward accreditation for
the center. Senior management of the El Camino CCD reported increased confidence in the
Compton CCD leadership team. They stated that the working relationships between the two
institutions are greatly improved since FCMAT’s last review.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
30 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 1.7 – Internal Control Environment
Professional Standard:
All employees are evaluated on performance at least annually by a management-level employee
knowledgeable about their work product. The evaluation criteria are clearly communicated and, to
the extent possible, measurable. The evaluation includes a follow-up on prior performance issues and
establishes goals to improve future performance.
Sources and Documentation:
1. Interview with the CBO
2. Interview with the CEO
3. Interview with the dean of human resources
4. Interviews with district staff
5. Evaluation Procedure for District Administrators, June 7, 2011
6. Contract Agreement Between the Compton CCD and the CCC Federation of Classified
Employees, July 1, 2009 through June 30, 2012
7. Agreement Between the Compton CCD and the CCC Federation of Employees (Certificated
Unit), July 1, 2010 through June 30, 2013
8. Rules and Regulations of the Classified Service, Compton CCD Personnel Commission,
revised September 2005
9. A Guide to the Evaluation of Employee Performance in the Classified Service, Office of
Human Resources (no date)
10. Administrator employee performance evaluation forms
11. Classified employee performance evaluation forms
12. Manager employee performance evaluation forms
13. Memorandum, Human Resources re: Classified Employee Performance Evaluations, March
22, 2013
14. 2011-12 employee evaluation lists
15. Completed employee evaluation samples
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has developed and implemented comprehensive evaluation instruments for all
employee groups. Management evaluation documents contain examples of desirable profes-
sional attributes that include leadership, managerial and communication skills and abilities
as well as professional knowledge and expertise. The foundation for the classified employee
evaluation is established by the personnel commission and outlined in the Rules and Regula-
tions of the Classified Service. This document specifies the frequency and timing of classified
employee performance evaluations, the responsible party for providing evaluations, proce-
dures for completion and the appeals process if the employee is not satisfied with the evalua-
tion. Further information is provided in the Guide to Evaluation of Performance in the Classi-
fied Service document prepared by the Compton CCD Human Resources Department.
2. The management evaluation document includes templates for basic, comprehensive and
administrative evaluations. This standardized framework provides the necessary guidance
ACCJC Standard III 31
for managers and ensures that the district’s overarching goals are addressed in the process.
The classified evaluation document is a basic evaluation tool for assessing employees’ per-
formance related to quantity and quality of work, judgment, working relations, initiative,
dependability and reliability, attendance and punctuality, safety and communication skills.
For each area the employee is ranked: exceeds expectations, meets expectations, needs im-
provement or unsatisfactory. This tool also allows the evaluator to list employee performance
attributes in each area.
3. Performance evaluations are required annually for all management and classified employees.
Timely, consistent, execution of evaluations is essential to guide employees in meeting the
duties and responsibilities of their positions as outlined in their job description. Employee
evaluations serve as a tool for addressing areas of weakness in performance and to acknowl-
edge and encourage progress. The team selected and reviewed a sample of employee evalua-
tions. Instances of specific areas of improvement were noted for some employees, with mea-
surable goals to attain satisfactory results on future evaluations.
4. Management is notified by the Human Resources Department to complete annual employee
evaluations. A memo is sent to administrators and managers each March along with a list of
employees to be evaluated. Because of the vacancy and subsequent new hire of an individual
in the district’s CBO position during the last review period, deadlines for completing evalua-
tions in the business office were not met. Although the evaluation process had not concluded
for the current review period at the time of FCMAT’s fieldwork, evaluations were under way
for all business office staff.
5. The collective bargaining agreement between Compton CCD and the certificated bargaining
unit requires performance evaluations to be completed every three academic years for ten-
ured employees and clearly establishes the criteria for evaluation methods and criteria. Fac-
ulty evaluation methods alternate between basic and comprehensive, unless the faculty mem-
ber elects to receive a comprehensive evaluation or one is called for by the faculty member’s
dean or division chair. FCMAT selected and reviewed a sample of evaluations for faculty
members. The evaluations selected for review were timely and complete.
6. The dean of human resources reported that staff members responsible for managing employ-
ees are offered trainings regarding effective employee management and evaluation. However,
attendance is not mandatory, and the district was unable to provide documentation supporting
management attendance at such trainings during this review period. Regular training should
be conducted regarding best practices for completing employee evaluations because it pro-
vides necessary up-to-date guidance for managers and increases the effectiveness of employ-
ee evaluations.
32 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 33
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 1.8 – Internal Control Environment
Professional Standard:
Top management sets the tone and establishes the environment. Therefore, appropriate measures are
implemented to discourage and detect fraud.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Interview with the interim director of accounting
4. Interviews with district staff
5. Independent Audit Report, June 30, 2012
6. Board Policy 7700, Whistleblower Protection, June 8, 2010
7. Administrative Regulation 7701, Whistleblower Reporting Protocols (draft)
8. WeTip flyer
9. Internal auditor survey results
Progress on Implementing the Recommendations of the Recovery Plan:
1. Staff indicated that the administration is working to establish proper chain of command, in-
creasing the effectiveness of management oversight of employees and their work, and con-
veying the expectation of high integrity and ethical behavior throughout the organization.
Many staff members noted that the CBO and new interim director of accounting are very
hands on, routinely provide guidance, and actively monitor and review employee work. Staff
reported that they work closely with the management team and are frequently required to
demonstrate their work product and provide an overview and backup documentation to sup-
port the work performed.
2. The primary objective for management is to achieve effective internal controls and include
reasonable assurance of the following:
a. Compliance with policies, procedures, plans, laws and regulations is achieved
b. Assets are safeguarded against theft and/or loss
c. Financial information is accurate and reliable
d. Financial and operational information is timely
e. Resources are used effectively, efficiently and economically
f. Established operational and programmatic goals and objectives are met
The CBO is developing written operational policies and procedures for business office func-
tions. Formal operational policies and procedures help to establish protocols for the comple-
tion, review and oversight process of each function in the business office. When properly de-
signed, implemented and followed, written procedures improve the effectiveness of the inter-
nal control structure and offer reasonable assurance that occurrences of fraud will be avoided.
34 ACCJC Standard III
3. While all employees have some degree of responsibility for the district’s internal controls,
ultimately management is responsible for detecting fraud. Each member of the management
team, including the special trustee, should be familiar with the signs of fraud. Although the
CBO is responsible for ensuring proper internal controls are established and procedures are
implemented in the Business Services Department to properly safeguard assets, the district
should not rely solely on this position to identify and prevent fraud or other illegal activi-
ties. A separate party, independent of the business office, should conduct internal reviews to
ensure there is monitoring of the individuals assigned to manage fiscal resources and of the
department as a whole. Compton CCD has worked to discourage and detect fraud by devel-
oping and implementing applicable policies and procedures, and has implemented the WeTip
program and fraud hot line as the primary tools for communicating the presence of a fraud
prevention program.
4. Establishing and maintaining a fraud prevention program is essential in fraud deterrence.
The district operates a fraud prevention program that includes a fraud hotline and has worked
to increase awareness of the WeTip program throughout the district. Posters promoting the
WeTip program were observed in some departments, but were not prominent throughout the
campus. Staff indicated a general knowledge of the WeTip program, which allows them to
anonymously submit tips about potential fraud. However, although the signage says the ho-
tline is anonymous, some feel the name of the program creates a perception that the caller is
a “snitch,” which may discourage its use. Increasing communications to staff and students of
how the WeTip program works may help alleviate concern about anonymity. Greater aware-
ness of the program will also help communicate management’s intent to maintain a high level
of focus on fraud deterrence and prevention.
5. The district has resumed its progress in addressing internal control weaknesses, as evident
by the reduction of audit findings identified in the June 30, 2012 audit report. The CBO has
been diligent in his efforts to provide effective oversight, review, training, and reinforcement
of proper internal controls and operational procedures, which helps to provide reasonable as-
surance that the district’s operations are effective, efficient, and sound and that the financial
information is reliable.
6. All purchasing tasks are processed by the purchasing technician, who has the ability to add
new vendors in the financial software system. Accounts payable has access to some of the
vendor demographic screens necessary to make minor changes to vendor information, such
as payment remittance edits. User access is managed by the El Camino CCD. Proper internal
controls should provide for system access controls associated with the maintenance of ven-
dor master files and should segregate duties, including those related to modifying a vendor’s
remittance address, from activities associated with processing vendor payments. The district
should review employee system access permissions and ensure they are consistent with and
support established internal controls and that accounts payable staff have read-only access to
vendor demographic screens.
ACCJC Standard III 35
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 1
April 2013 Rating: 5
Implementation Scale:
36 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 2.1 – Inter- and Intra-
Departmental Communications
Professional Standard:
The business and operations departments communicate regularly with internal staff and all user
departments on their responsibilities for accounting procedures and internal controls. The communi-
cations are written whenever possible, particularly when they (1) affect many staff or user groups, (2)
are issues of high importance, or (3) reflect a change in procedures. Procedures manuals are neces-
sary for the communication of responsibilities. The departments also are responsive to user depart-
ment needs, thus encouraging a free exchange of information between the two (excluding items of a
confidential nature).
Sources and Documentation:
1. Interview with the CBO
2. Interview with the CEO
3. Interviews with Business Services Department staff
4. 2012-13 Year-End Task List and individual staff responsibility
5. Business Officers of Southern California Community Colleges (BOSCCC) meeting notice,
May 9, 2012
6. Independent contractor payment checklist with website reference
7. Purchasing Department – Policies and Procedures, revised February 1, 2013
8. Draft Equipment Purchase Guidelines, February 19, 2013
9. Sample blanket purchase order
10. Purchasing Department Policy, February 1, 2013
11. Purchase Order Terms and Conditions, April 9, 2013
12. Accounts Payable Department – Policies and Procedures, October 16, 2012
13. Sample monthly budget vs. actual communications from Business Services to other
departments
14. Business Services Department training list
15. Board policies and administrative regulations for procurement and accounts payable
(February 2009)
16. Compton CCD Consultant Service Agreement
17. Memo to administrators, faculty and staff regarding 2012-13 key Business Services
Department purchasing deadlines
18. Final Budget 2012-13
19. Compton Center Construction Update, February 7, 2013
20. Capital Outlay Bond Funds Procedures, adopted March 5, 2013
21. Scholarship Procedures, adopted December 14, 2012
22. Board of Trustees January 15, 2013 meeting notice, January 9, 2013
23. El Camino College President’s Newsletter, November 29, 2012
24. Compton Community College District Citizens’ Bond Oversight Committee July 20 Meeting
Summary, September 7, 2012
ACCJC Standard III 37
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Planning and Budget Committee meets regularly throughout the year. Meetings are held
more frequently during the budget development period. This group is comprised of seven to
nine members representing business office, senior administration, department managers and
bargaining units. Detailed information about the budget is presented for general discussion,
and requests for special allocations are presented for consideration. Budget assumptions and
estimates for the subsequent fiscal year are shared with members of the committee. These
meetings are routinely documented in meeting minutes.
2. Regular campuswide informational meetings are held for all employees. These meetings are
designed to keep all employees informed of the budget development process and provide
a forum for management to address individual questions. This is informative for Compton
CCD employees and provides transparency to the budget development process. All employ-
ees are encouraged by the CEO to attend and participate.
3. FCMAT reviewed several documents, including the following, designed to provide informa-
tion to employees and others on business procedures and the budget process:
a. Memos, emails and training documentation that demonstrate efforts to train staff on busi-
ness procedures and responsibilities.
b. Purchasing guidelines, revised February 1, 2013; the new Purchasing Department policy,
adopted February 1, 2013; and purchase order terms and conditions, adopted April 9, 2013,
all of which exhibit an effort to inform and enforce procedures.
c. The development and distribution of Business Services Department procedures to inform
staff of proper protocol and expectations.
4. The final budget, which lists overarching goals and objectives for 2012-13, includes a pro-
jected decrease in enrollment of 475 full-time equivalent students (FTES) and institutional
capacity from the previous year, from 6,375 to 5,900 FTES as a result of the state’s deterio-
rating fiscal condition. The final budget also indicated that if the November 2012 Proposition
30 passed, CCD may make adjustments to the budget and bring it to the special trustee for
consideration.
5. The district continues to use the Plan Builder budget development tool to assist departmental
staff in developing budget proposals that are tied to departmental goals. The process coordi-
nates departmental goals with the resources necessary to accomplish them and identifies the
correlation with the district’s overall strategic goals and plans. Each plan contains goals, mul-
tiyear strategic directions, time lines and resources needed to achieve the desired objectives.
These plans are then compiled into a comprehensive district plan.
6. The district has not implemented institutional (desk) procedure manuals for day-to-day tasks
in the Business Services Department, but has begun to draft processes and procedures, which
are placed on an internal shared drive for all Business Services staff to access.
7. Since FCMAT’s last review, the turnover in key positions has diminished. The CBO position
was filled on April 30, 2012, and the individual had been in the position for approximately
one year at the time of FCMAT’s fieldwork. The CBO has begun to draft processes and pro-
38 ACCJC Standard III
cedures for day-to-day operations and has created a 2012-13 year-end closing document, in-
dicating responsibilities for staff members.
8. The CBO provided FCMAT with a document outlining year-end closing responsibilities for
staff members; however, at the time of FCMAT’s fieldwork the document had not been dis-
seminated to Business Services Department staff nor had they received communication re-
garding their responsibilities for closing procedures for the fiscal year ending June 30, 2013.
In addition, no internal year-end desk procedures were in place for Business Services staff,
but interviews with staff and the CBO indicated this is a priority for fiscal year 2013-14.
9. The CEO issues a monthly newsletter to the campus community, and the Business Services
Department emails monthly budget vs. actual departmental financial reports to all department
heads.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 6
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 39
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 2.2 – Inter- and Intra-
Departmental Communications
Professional Standard:
The financial departments communicate regularly with the Governing Board and community on the
status of college finances and the financial impact of proposed expenditure decisions. The communi-
cations are written whenever possible, particularly when they affect many community members, are
issues of high importance to the college and board, or reflect a change in policy.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Interviews with district staff
4. Planning and Budget Committee meeting minutes
5. Final Budget 2012-13, September 11, 2012
6. Preliminary Unrestricted General Fund Budget 2013-14
7. PowerPoint Presentation – CEO’s Community Roundtable Discussions
8. PowerPoint Presentations to the board regarding budgetary issues, September 11, 2012 and
February 19, 2013
9. Board meeting agendas and minutes
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district’s Business Services Department continues to regularly present purchase orders,
stale dated checks, and budget transfers/augmentations to the board/special trustee for ap-
proval, with purchase orders and stale dated checks appearing as consent items on the board
agendas. The documentation for budget transfers/augmentations continues to provide the
rationale for their necessity and they are presented as action items, which facilitates board
discussion.
2. The district began providing the board with monthly updates for Measure CC bond fund-
ing beginning at its November 13, 2012 meeting. Although the updates for the February 19,
2013, March 19, 2013 and April 16, 2013 meetings all indicated that the expenditures pre-
sented were through January 31, 2013, they reflect differing expended amounts, with the Feb-
ruary report omitting $6 million in expenditures.
3. The 2012-13 Final Budget dated September 11, 2012 lists the district’s Guiding Principles
for Planning & Budgeting, which includes maintaining student success; assessing programs
based on relevance, cost effectiveness and ability to meet community needs; high quality
programs with appropriate support; and creating and supporting revenue generating opportu-
nities. However, this information was not included in the district’s Preliminary Unrestricted
General Fund Budget for the 2013-14 fiscal year.
4. Quarterly and annual financial status reports were provided during board meetings through-
out the fiscal year. In addition, board minutes reflect that two budget presentations took place
40 ACCJC Standard III
during 2012-13, occurring on September 11, 2012 and February 19, 2013. These were oral
presentations related to the potential effects of Proposition 30 not passing, and the status of
the college at December 31, 2012. They included PowerPoint slides, but written materials
were not included in board agenda packets.
The August 21, 2012 board meeting minutes indicate approval of a resolution regarding tem-
porary interfund borrowing. On one occasion, meeting minutes reflected board discussions
pertaining to budget transfers and prevention of overspending. While board agendas reflect
items such as the 2011-12 audit presentation and quarterly and annual financial status reports,
these were presented as informational items to the board, and board minutes do not reflect
whether board or community discussion occurred.
5. During the 2012-13 fiscal year, the CEO provided a PowerPoint presentation at multiple
community forums to communicate the status of the district’s construction projects, accredi-
tation efforts, and focus on fiscal stabilization. A similar presentation was provided to the city
of Compton on February 5, 2013 and at the CEO’s state of the district presentation on De-
cember 16, 2012.
6. District staff reported they generally feel informed about what is occurring in the district
and in the Business Services Department. The CEO routinely prepares a communication to
employees titled Message from Interim CEO, which is posted on the district’s website and is
available at the front desk of administrative departments. The CEO has an open door policy
and routinely maintains weekly open door hours. Interviews with staff indicated that they are
knowledgeable of the communications made available to them and are comfortable taking
advantage of the CEO’s open door policy if they have issues they wish to discuss.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 41
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 2.4 – Inter- and Intra-
Departmental Communications
Professional Standard:
The college has formal policies and procedures that provide a mechanism for individuals to report
illegal acts, establish to whom illegal acts should be reported, and provide a formal investigative
process.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Board Policy 7700, Whistleblower Protection, June 8, 2010
4. Administrative Regulation 7701, Whistleblower Reporting Protocols (draft)
5. WeTip flyer
6. Observation of program postings
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has adopted policies and administrative regulations that establish district orga-
nizational hierarchy and increase the resistance to fraud including: organizational structure,
access to facilities and property, delegation of authority, procurement, asset security and ac-
counting, reporting of crimes and an annual external audit.
2. The district adopted Board Policy 7700, Whistleblower Protection, on June 8, 2010 that
authorizes the CEO to establish regulations regarding the reporting and investigation of sus-
pected fraudulent activities and provides protection from retaliation for those who make such
reports in good faith and/or assist in the investigation of such reports.
3. Board Policy 7700 references AR 7701, Whistleblower Reporting Protocols. This AR, which
remains in draft form, encourages and provides guidance to individuals to report suspected
incidents of unlawful activities. To make progress on this standard, the district should finalize
and adopt the administrative regulation to formalize the protocols and administrative proce-
dures that support BP 7700. These procedures solidify the established methods for reporting
inappropriate activities, including a fraud hot line and the WeTip program, and the general
investigative process.
42 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating 5
June 2012 Rating: 3
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 43
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 2.5 – Inter- and Intra-
Departmental Communications
Professional Standard:
Documents developed by the financial departments for distribution to the board, staff and commu-
nity are easily understood.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Planning and Budget Committee meeting minutes
4. Final Budget 2012-13, September 11, 2012
5. Unrestricted General Fund Preliminary Budget 2013-14
6. Quarterly Financial Status Report – Form CCFS – 311Q – for quarters ended June 30, 2012;
September 30, 2012; December 31, 2012
7. Annual Financial Status Report – Form CCFS – 311A – October 2012
8. Message(s) from Interim CEO
9. News releases
10. Board meeting agendas
Progress on Implementing the Recommendations of the Recovery Plan:
1. For the 2011-12 and 2012-13 fiscal years, the duties associated with financial management,
budget planning and development, and fiscal communications were performed by the interim
CEO with the assistance of a consulting agreement with a former district CBO. The district
hired a permanent CBO in April 2012. That person has assumed the duties related to financial
management, budget planning and development, and fiscal communications from the CEO,
which has allowed the CEO to expand the district’s message into such venues as community
forums.
2. Financial information for the unrestricted and restricted resources is presented separately
and summarized by object code in the 2012-13 Final Budget and Unrestricted General Fund
Preliminary 2013-14 Budget narratives. Financial data is provided in three columns for the
budget year and two preceding fiscal years for each district fund. Very little detail is provided
to support the amounts presented for each revenue and/or expenditure object total. Detailed
district assumptions, projections, goals and plans are essential to providing readers a clear
understanding of the basis of financial projections. Although some details are provided in the
introductory overview of assumptions, tying those figures back to the final numbers present-
ed would be challenging. A summary of significant changes presented by major object code
would help readers to interpret the changes in budget amounts from one period to the next.
3. Planning and Budget Committee meetings continue to be held regularly. The members repre-
sent various district groups. Discussion items include current budget, future budget, facility
issues, enrollment plans, overarching goals, budget assumptions and other business topics as
determined by the committee. Meeting minutes are taken and reviewed to memorialize the
44 ACCJC Standard III
discussion. Budget development is a collaborative effort, with contributions from the CEO,
CBO, cabinet members, Planning and Budget Committee, Consultative Council, and depart-
ments, all of whom work to define and develop the assumptions and details of the tentative
budget. However, review of the narrative accompanying the financial information provides
limited detail of its origin, and the minutes of the Planning and Budget Committee’s Novem-
ber 27, 2012 meeting reflect a desire for additional training on the budget process.
4. The documents distributed by the business office continue to be in a narrative or spreadsheet
format. To increase involvement and understanding, the district should use visual presenta-
tions, including graphs and charts to help those unfamiliar with the fiscal environment to
more easily understand the budget and fiscal issues.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 45
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 4.1 – Internal Audit
Professional Standard:
The Governing Board has adopted policies establishing an internal audit function that reports direct-
ly to the president or Governing Board.
Sources and Documentation:
1. Interview with the CBO
2. Interview with the CEO
3. Internal Operations Review Plan, March 1, 2013
4. Planning and Budget Committee agenda, March 26, 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district lacks a dedicated internal audit position and has abandoned the effort to establish
one at this time due to economic factors. FCMAT has routinely recommended that Compton
CCD re-establish the internal audit program and hire an internal auditor dedicated exclu-
sively to the Compton campus to regain momentum in establishing proper internal controls in
key operating areas including the business office, bursar’s office, financial aid, and categori-
cal state and federal grants.
Although the district has decided not to staff an internal audit position at this time, it is a pri-
ority of the CEO to establish an environment and culture that clearly communicates that fraud
and other illegal acts will not be tolerated and that all allegations will be investigated. District
administrators indicated two of the administrators in the Business Services Department have
extensive experience as former auditors in community colleges, and have mitigated the need
for a separate internal audit position by developing an internal audit plan designed to identify
existing internal controls and monitor and update processes and procedures. As a means of
addressing the internal audit function, the Internal Operations Review Plan specifically states
the following:
… this plan also is designed to review information to determine its reliability, review
compliance – ensuring employees are complying with the District’s policies and pro-
cedures as well with external laws and regulations, and review of assets to determine
they are safeguarded.
The plan identifies the CBO as the position responsible for reviewing, revising, implementing
and enforcing the plan. Because this position is the primary party responsible for the imple-
mentation and oversight of all business activities and ensuring that district assets are prop-
erly safeguarded, the elements of objectivity and neutrality are lost. Neutrality requires the
reviewing party to be free from bias. Objectivity is impaired because the CBO is directly re-
sponsible for ensuring that adequate systems are in place, reviewed and monitored regularly.
In essence this plan has the CBO checking his own work and does not protect the organiza-
tion from the risk created by his actions or omissions.
46 ACCJC Standard III
Effective internal auditing is vital to a strong control environment. To be effective, the in-
ternal auditor must be neutral and objective. Objectivity is strengthened when the internal
auditor reports directly to the highest level of authority. Therefore, the internal auditor should
report to the CEO or the governing board/special trustee. Under the existing plan, the estab-
lishment of an audit committee could help to offset the loss of objectivity and neutrality cre-
ated as a result of the lack of review by a third party. Audit committees, typically composed
primarily of board members and top administration, monitor the control structure and act as
liaison between management and the internal auditor. Since the district plan essentially has
the CBO acting as the internal auditor, the district should establish an audit committee, re-
sponsible directly to the board/special trustee, to maximize the effectiveness of the control
structure.
2. Although the Internal Operations Review Plan, dated March 1, 2013, indicated that it would
be presented to cabinet and the Planning and Budget Committee for review and to set areas
of priorities, the Planning and Budget Committee’s March 26, 2013 agenda did not include
any items that specifically addressed this plan. Due to the timing of FCMAT’s fieldwork,
minutes for this meeting were not available.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 4
June 2009 Rating: 8
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 1
April 2013 Rating: 3
Implementation Scale:
ACCJC Standard III 47
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 4.4 – Internal Audit
Professional Standard:
Internal audit findings are reported on a timely basis to the Governing Board and administration, as
appropriate. Management then takes timely action to follow up and resolve audit findings.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Internal Operations Review Plan, March 1, 2013
4. Attachment “A”, Internal Operations Audit Plan – Priorities List, June 30, 2013
5. Vavrinek, Trine, Day & Co., LLP proposal for non-audit services, February 26, 2013
6. S. Haigler, CPA Report on Result of Service Work, January 8, 2013
7. Board meeting agendas and minutes
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district established the Internal Operations Review Plan designed to identify existing
internal controls and monitor and update processes and procedures in the district business of-
fice. As a means of addressing the internal audit function, the plan states that it was “designed
to review information to determine its reliability, review compliance – ensuring employees
are complying with the District’s policies and procedures as well with external laws and
regulations, and review of assets to determine they are safeguarded.” The Internal Operations
Review Plan incorporated Attachment A, Internal Operations Audit Plan – Priorities List.
This list prioritized 20 areas identified as susceptible to fraud and misstatement. The first five
Priority 1 items on the list are:
Area Reason
Payroll benefits Misuse of public funds. Fiscal issues, over-
charging district for benefits provided. Com-
pliance with bargaining unit contracts.
Payroll Clearance Fund Compliance with laws and regulations
State income tax filings Compliance with laws and regulations
Federal income tax filings Compliance with laws and regulations
Fuel tax filings Compliance with laws and regulations
2. Prior to being employed by the Compton CCD as interim director of accounting, S. Haigler,
CPA conducted a review of accounting activities related to the general fund payroll liability
for the health and welfare fund, which is a Priority 1 item on the district’s list. The systems in
place for managing health and welfare benefit transactions were reviewed and a report dated
January 8, 2013 was issued describing findings and recommendations. Weaknesses were
identified noting inadequacies in the district’s processes for ensuring that liability accounts
for health and welfare benefit accruals and payments are routinely reconciled.
48 ACCJC Standard III
The district did not provide FCMAT with follow-up documentation demonstrating that these
findings were presented to the Board of Trustees or that actions were taken as a result of the
findings and recommendations. Board agendas and minutes subsequent to January 8, 2013 do
not indicate that the report had been presented to the board.
3. Although the district has developed some new operational policies and procedures, none of
those provided to the review team addressed payroll activities and/or the routine reconcilia-
tion of the health benefit liability accounts.
The district is making some progress in taking action to identify weaknesses in the internal
control structure. Follow through in the development of processes and procedures that miti-
gate identified weaknesses is essential to completing this process, ultimately reducing the risk
of loss to the district.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 5
July 2010 Rating: 5
June 2012 Rating: 0
April 2013 Rating: 3
Implementation Scale:
ACCJC Standard III 49
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 5.1 – Budget Development Process (Policy)
Professional Standard:
The budget development process requires a policy-oriented focus by the Governing Board to develop
an expenditure plan that fulfills the college’s goals and objectives. The Governing Board focuses
on expenditure standards and formulas that meet the college’s goals. The Governing Board avoids
specific line-item focus, but directs staff to design an entire expenditure plan focusing on student and
college needs.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Interviews with board member and Planning and Budget Committee member
4. Board Policy 6200, Budget Preparation, March 17, 2009
5. Administrative Regulation 6201, Budget Calendar, March 17, 2009
6. Board Policy 6250, Budget Management, September 15, 2009
7. Administrative Regulation 6251, Budget Management, February 17, 2009
8. Administrative Procedure 6251A, Budget and Expenditure Management, September 15, 2009
9. Tentative Budget 2012-13
10. Budget - Policies and Procedures manual, revised draft February 1, 2013
11. Final Budget 2012-13, September 11, 2012
12. Unrestricted General Fund Preliminary Budget 2013-14
13. 2012-13 Strategic Initiatives, El Camino College
14. Board meeting agendas and minutes
15. Planning and Budget Committee meeting minutes
Progress on Implementing the Recommendations of the Recovery Plan:
1. On March 17, 2009, the Compton CCD adopted Board Policy 6200, Budget Preparation. This
policy provides district administration with direction on items to be included in budget devel-
opment and includes that “[t]he annual budget shall support the District’s master and educa-
tional plans” and “[b]udget projections shall address long-term goals and commitments.” The
policy further directs the CEO to establish the budget calendar and regulations necessary to
carry out this policy.
The Business Services – Draft Budget Development, Monitoring and Maintenance Policies
and Procedures manual delineates the process of developing the district’s budget and includes
a section discussing overall goals and objectives of the process. The district’s guiding prin-
ciples are to link to the strategic initiatives set by El Camino College, as reported by district
staff and confirmed by Planning and Budget Committee meeting minutes. The guiding prin-
ciples are then used by departments to develop their budgets. Review of the Final Budget for
2012-13 revealed that Guiding Principles for Planning & Budgeting were included in that
document. The 2012-13 strategic initiatives of El Camino College and the guiding principles
in the 2012-13 Final Budget both speak to the ultimate goal of student success and learning
as well as how the districts will seek to achieve those results. The Compton CCD’s goals
50 ACCJC Standard III
included a principle to “create and support revenue generating opportunities” while El Cami-
no’s initiatives were silent on the subject. The Unrestricted General Fund Preliminary Budget
for 2013-14 did not contain a listing of the goals/objectives used in preparing that document.
The Board of Trustees goals for 2012-13 were approved on June 12, 2012 and listed for dis-
cussion on multiple board agendas with the last such discussion occurring on April 16, 2013;
however, the agenda packet materials indicate that these are not goals of the district as a
whole but goals for individual board members. The following headings were included:
I. Participate in community activities and events and bring observations to the Board
II. Participate in the operation of the district at board meetings
III. Continue a trustee education program
IV. Support the CCCD Facilities Master Plan
V. Fiscal responsibilities
VI. Support partnership with El Camino College
VII. Support the Foundation for Compton Community College District
VIII. Support the Compton Community College District Redistricting Action Plan
IX. Required board training
Although interviews with district staff indicated that the 2013-14 budget was being de-
veloped based on goals, objectives or guiding principles, the documentation provided to
FCMAT did not demonstrate whether the board was involved in their development. Addition-
ally, FCMAT attended the April 16, 2013 meeting of the Board of Trustees where the team
heard dialog pertaining to budgetary issues. However, the board’s comments were directed to
line item budget amounts rather than discussion of the budget as a whole in regard to meeting
the needs of the district and its students.
2. The budget calendar is outlined in Administrative Regulation 6201 providing a structure,
process, and time line for budget development and adoption. The time line includes prelimi-
nary budget planning and development as well as particular budget adoption phases. During
the preliminary phases, the CEO, CBO, cabinet members, Planning and Budget Committee
members, and departmental staff work to define and develop the assumptions and details of
the tentative budget. The Board of Trustees/special trustee is presented with a proposed ten-
tative budget and adopts the tentative budget in the budget adoption phase of the calendar.
This regulation requires the final budget adoption to occur no later than September 15. The
August 21, 2012 board meeting agenda and minutes included a Notice of Public Hearing –
2012-2013 Final Budget. The district’s Final Budget for 2012-13 was presented to the board
on September 11, 2012, and the minutes of that meeting reflect that the regular meeting was
adjourned for the public hearing as required by the California Code of Regulations Title 5,
Section 58301.
3. AR 6201 states that the tentative budget is to be presented to the board and a public hearing
scheduled between May 10 and June 30. The district’s Tentative Budget 2012-13 was placed
on the agenda as a discussion/action item for the Board of Trustees’ regular board meeting
on June 12, 2012. The minutes of that meeting show that the 2012-13 tentative budget was
approved. The 2012-13 tentative budget included the underlying budget assumptions and a
summary of revenues and expenditures for each district fund; however, information on bud-
geted positions by fund was not included. Due to the timing of FCMAT’s fieldwork, the com-
ACCJC Standard III 51
plete tentative budget for 2013-14 was not available to determine if it included these items.
The Final Budget 2012-13 included the budgeted positions by fund as well as additional
information including but not limited to the base revenue calculation, Planning and Budget
Committee, five-year capital construction plan, history of fees – enrollment, full-time faculty
obligation, list of memberships authorized for the 2012-13 year and update of the FTES re-
covery plan.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 3
April 2013 Rating: 5
Implementation Scale:
52 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 5.3 – Budget Development Process (Policy)
Professional Standard:
Policies and regulations exist regarding budget development and monitoring.
Sources and Documentation:
1. Board Policy 6200, Budget Preparation, March 17, 2009
2. Administrative Regulation 6201, Budget Calendar, March 17, 2009
3. Board Policy 6250, Budget Management, September 15, 2009
4. Administrative Regulation 6251, Budget Management, February 17, 2009
5. Administrative Procedure 6251A, Budget and Expenditure Management, September 15, 2009
6. Board Policy 6300, Fiscal Management, February 17, 2009
7. Budget – Policies and Procedures manual, revised draft February 1, 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board policies, administrative regulations, and administrative procedures addressing bud-
get development and monitoring roles and responsibilities have been issued and some have
been revised. However, they have not been revised for four years, there have been numerous
changes in district leadership, and interviews with district administration indicate that some
revision may be necessary for the policy to match the actual process. For example, AR 6201
requires a public hearing to be held for the tentative budget between May 10 and June 30,
and the public hearing did not occur for the 2012-13 tentative budget. Additionally, AR 6201
assumes the governor will sign the state budget prior to September 15 but does not provide
for alternative processes if the budget is signed later, e.g., the 2010-11 state budget, which
was signed on October 8, 2010.
2. The district has developed a draft manual for business services policies and regulations with
regard to budget development, monitoring, modification, and maintenance; and operation of
the budget department. This draft manual reflects revisions as of February 1, 2013 and states
it is to be reviewed and revised “in conjunction with the employees of the Budget Depart-
ment and others on campus (e.g. The Budget Planning Committee) as appropriate but at least
annually by February of each year.” The manual identifies the positions responsible for the
budget, and the processes for the development, tracking, maintenance and modification of the
budget were clearly described.
ACCJC Standard III 53
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 0
June 2009 Rating: 6
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
54 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standards 5.4 and 5.6 – Budget Development
Process (Policy)
Professional Standard:
Standard 5.4: The college has a clear process to analyze resources and allocations to ensure that they
are aligned with strategic planning objectives and that the budget reflects college priorities.
Standard 5.6: Categorical funds are an integral part of the budget process and have been integrated
into the entire budget development. The revenues and expenditures for categorical programs are
reviewed and evaluated in the same manner as unrestricted general fund revenues and expenditures.
Categorical program development is integrated with the college’s goals and is used to respond to
specific college student needs to support student learning outcomes.
Sources and Documentation:
1. Interviews with deans and directors of various departments
2. Interviews with Planning and Budget Committee and Consultative Council members
3. Board Policy 6200, Budget Preparation, March 17, 2009
4. Administrative Regulation 6201, Budget Calendar, March 17, 2009
5. Fiscal Affairs – Facility Rentals 2013-14 Annual Unit Plan
6. Fiscal Affairs – Payroll 2013-14 Annual Unit Plan
7. Fiscal Affairs – Purchasing 2013-14 Annual Unit Plan
8. Draft El Camino College Compton Center Planning Process flow chart, November 19, 2012
9. 2012-13 El Camino College Mission Statement and Strategic Initiatives
10. Budget – Policies and Procedures manual, revised draft February 1, 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. The budget development planning process has been developed and is memorialized in the
Business Services – Draft Budget Development, Monitoring and Maintenance Policies and
Procedures manual. It has also been converted into a draft flow chart that identifies the pro-
cess starting with the El Camino College (ECC) Mission Statement, ECC Strategic Initia-
tives, CCCD Accreditation Eligibility and ECC Accreditation Self Evaluation Recommenda-
tions, ECC Comprehensive Master Plan and CCCD’s Interim CEO’s overarching priorities.
Unit plans are then developed using the Plan Builder program and are submitted to the
department deans for review and advisement. Once approved by the deans, the process con-
tinues to the Planning and Budget Committee, Consultative Council, the CEO, and finally the
Board of Trustees/special trustee. This process allows for several reviews and evaluations to
ensure alignment of funds to priorities.
2. Interviews with various deans and directors and review of the plans for the Fiscal Affairs De-
partment revealed that the Plan Builder program continues to be utilized, and assists with the
development of plans for individual district departments. In the plan, the department states
its mission and overarching outcomes; identifies individual characteristics, performance and
trends in the department; evaluates strengths, weaknesses, opportunities and challenges; de-
scribes the strategic direction; and sets goals and objectives. The goals and objectives compo-
nent includes resources, funding needed for implementation and supporting rationale.
ACCJC Standard III 55
3. Review of the unit plans in conjunction with the El Camino College mission statement and
strategic initiatives reflects that they are aligned with one another and focused on student
learning and success while being mindful of limited resources. Plans respond to the needs of
the students/employees/community and use assessment, program review, planning and re-
source allocation to improve programs and services.
4. The Planning Process flow chart also indicates that the district utilizes the CEO’s overarching
priorities as a basis for budget development. FCMAT was not provided copies of these priori-
ties for the 2011-12, 2012-13 or 2013-14 planning cycles and, therefore, was unable to deter-
mine if these priorities were developed, documented, communicated and used in the budget
development process.
5. The optimal use of institutional resources, accompanied by documentation showing that re-
sources are integrated through the shared governance process, are instrumental in successful
fiscal resource management. The Compton CCD has established board policies, administra-
tive regulations and written documentation that facilitate the development of an operating
budget that allocates resources in alignment with district objectives. Based on the district’s
list of resources and on interviews with those responsible for department/unit budgeting, the
district receives very little categorical funding. Because there is only one campus, categorical
funding received is more easily accounted for as opposed to being divided among multiple
campuses. However, there was little indication that department staff understood how their
funding allocations are determined, and they were unable to provide allocation formulas or
documentation to FCMAT.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 4
April 2013 Rating: 4
Implementation Scale:
56 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 6.1 – Budget Development Process
(Technical)
Professional Standard:
The Budget Office has a technical process to build the preliminary budget amounts that includes: the
forecast of revenues, the verification and projection of expenditures, the identification of known car-
ryovers and accruals and the inclusion of concluded expenditure plans. The process clearly identifies
the sources and uses of funds. Reasonable FTES and COLA estimates are used when planning and
budgeting. The same process is applied to all funds.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the CBO
3. Interviews with Business Services Department staff
4. Board Policy 6200, Budget Preparation, March 17, 2009
5. Administrative Regulation 6201, Budget Calendar, March 17, 2009
6. Board Policy 6250, Budget Management, September 15, 2009
7. Administrative Regulation 6251, Budget Management, February 17, 2009
8. Administrative Procedure 6251A, Budget and Expenditure Management, September 15, 2009
9. Budget - Policies and Procedures manual, revised draft February 1, 2013
10. Final Budget 2012-13, September 11, 2012
11. Unrestricted General Fund Preliminary Budget 2013-14
12. Independent Audit Report, June 30, 2011 and June 30, 2012
13. Reconciliations of funds/department accounts between Datatel and PeopleSoft
Progress on Implementing the Recommendations of the Recovery Plan:
1. The process of budget planning, development and adoption has been formalized with the
implementation of board policies, administrative regulations, administrative procedures and the
recently revised Business Services – Draft Budget Development, Monitoring and Maintenance
Policies and Procedures manual. The manual was originally written several years ago and was
last revised in February 2013. The changes that have occurred in the district’s Business Services
Department under the leadership of the new CBO during the past year have been incorporated
into the manual. It now includes the budget analyst position in the budget development process
and designates the director of accounting to serve as backup to the CBO. The district should
continue to review this manual annually to ensure it is consistent with any future changes to the
business office structure, operational procedures, and board policies and procedures.
The business manual identifies the CBO as the budget manager, who “has personal responsi-
bility for the processes and deliverables of the budget process.” The CBO position has expe-
rienced a great deal of instability with each of the three prior budget cycles. For 2012-13, a
former district CBO was hired as a consultant to help develop the budget, and the new CBO
completed that process. The CBO has been with the district since April 2012 and developed
the 2013-14 budget without outside assistance.
ACCJC Standard III 57
2. The district’s annual independent audits had previously reported findings of material weak-
ness in the financial system and Business Services Department related to inaccurate journal
entries, duplicate journal entries, inadequately trained personnel, and lack of reconciliation of
asset and liability accounts. These material weaknesses increase the risk that the district’s in-
ternal controls will not prevent or detect a material misstatement of the financial statements.
Finding 2011-5 from the June 30, 2011 audit report stated that the district had not developed
a corrective action plan for deficiencies noted in the June 30, 2010 audit report and that the
defective conditions continued to exist. A review of the audit report for the year ending June
30, 2012 indicated that the district had reduced total findings from 26 in the 2010-11 fis-
cal year to 13 in 2011-12, eliminated the findings of material weaknesses and resolved the
defective conditions reported in finding 2011-5 to the satisfaction of its auditors. These im-
provements and corrections offer increased assurance that the district can provide accurate
financial reporting for use in budgeting, calculating carryovers and evaluation of expenditure
plans.
3. The June 30, 2012 audit continues to report a finding related to the district’s use of both
Datatel and PeopleSoft software. The district is required by El Camino CCD to use Datatel,
and the Los Angeles County Office of Education (LACOE) requires the use of PeopleSoft
as the financial system of record. This structure creates inefficiencies, delays the availability
of financial information, and increases the possibility of human error in the reconciliation
process. Under the leadership of the CBO, the interim director of accounting and the budget
analyst have been assigned to reconcile accounts between the two systems. At the time of
FCMAT’s fieldwork, staff reported that the process for completing reconciliations was almost
complete. To streamline and automate the process, the district is developing an Excel spread-
sheet that will help perform the reconciliation. The district provided FCMAT a sample of the
reconciliations completed but did not provide documentation demonstrating the status of the
project.
4. The Final Budget 2012-13 contains a list of the assumptions utilized including those for
FTES, COLA and faculty/non-faculty positions. The FTES have decreased by 440 from the
2011-12 Final Budget. Five faculty and six non-faculty positions were being filled, five posi-
tions were going to remain unfilled although budgeted for, and the budget assumes a cost-of-
living-adjustment (COLA) of zero. The zero COLA assumption was likely the best-case sce-
nario given the state’s financial difficulties at the time. However, no assumptions were listed
or quantified in the 2012-13 Final Budget that would have mitigated reductions in funding if
the state’s financial condition worsened or the governor’s November 2012 tax initiative did
not pass. It is best practice to assess and communicate the effect of all potential financial sce-
narios that may affect the district’s financial position and to develop steps to promptly miti-
gate any shortfalls and ensure fiscal stability.
5. The Final Budget 2012-13 reflects the budgets of the general fund, general line of credit, cap-
ital outlay fund, general obligation bond funds, workers’ compensation self-insurance fund,
property and liability self-insurance fund, child development fund, student financial aid fund,
and associated student body funds. However, only the assumptions related to the general fund
were provided in the Final Budget.
58 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 4
Implementation Scale:
ACCJC Standard III 59
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 7.5 – Budget Adoption, Reporting, and
Audits
Professional Standard:
The quarterly fiscal status reports show an accurate projection of the ending fund balance. Material
differences are presented to the Governing Board with detailed explanations.
Sources and Documentation:
1. Board meeting agendas and minutes
2. Quarterly Financial Status Report – Form CCFS – 311Q – for quarters ended June 30, 2012;
September 30, 2012; December 31, 2012
3. Annual Financial Status Report – Form CCFS – 311A – October 2012
4. Independent Audit Report, June 30, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district’s board agendas show that the quarterly financial status reports have been con-
sistently presented to the board as discussion/information items during this review period.
While the unrestricted general fund budget and year-to-date actuals are included as columnar
material in the board item and language is included stating “the following Quarterly Financial
Status Report,” the board packets posted online do not contain the reports being filed with the
state Chancellor’s Office. This presentation is confusing and unclear regarding what is being
presented to the board. As with the prior review period, none of the reports reviewed con-
tained a written variance analysis to provide the board with detailed explanations regarding
where differences occurred from one report to the next. The district should conduct analysis
and identify and communicate where variances occur between reporting periods.
2. Analysis of the district’s unrestricted general fund ending fund balance, comparing the June
2012 quarterly financial status report to the October 2012 annual financial status report, re-
vealed that the quarterly report projected $1.9 million less than the annual report for that year.
Comparisons of the October 2012 annual report to the audited financial statements shows
that the auditors were required to post $845,385 in one adjusting entry related to a transfer of
expenditures from the capital outlay projects fund to the revenue bond. No adjustments were
necessary to any other funds.
3. The audited financial statements for the year ending June 30, 2012 mark the first year in at
least the last three where no audit findings were identified as material weaknesses.
4. To improve adherence to this standard, the district should regularly update current year bud-
get projections and communicate variances and changes to the Board of Trustees in a manner
that encourages involvement and discussion, and ensures understanding.
60 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 4
April 2013 Rating: 4
Implementation Scale:
ACCJC Standard III 61
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 8.2 – Budget Monitoring
Professional Standard:
There are budget monitoring controls, such as periodic reports, to alert department and site manag-
ers of the potential for over-expenditure of budgeted amounts. Revenue and expenditures are forecast
and verified monthly.
Sources and Documentation:
1. Interview with the CBO
2. Interview with the director of fiscal affairs
3. Interviews with departmental budget holders
4. Interviews with Business Services Department staff
5. Board Policy 6250, Budget Management, September 15, 2009
6. Administrative Regulation 6251, Budget Management, February 17, 2009
7. Administrative Procedure 6251A, Budget and Expenditure Management, September 15, 2009
8. Board Policy 6300, Fiscal Management, February 17, 2009
9. Forms: Budget Transfer Request and Expenditure Transfer Request
10. Budget - Policies and Procedures manual, revised draft February 1, 2013
11. Sample Account Availability reports
12. Sample budget transfers
13. Independent Audit Report, June 30, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has adopted and implemented policies, regulations and procedures on budget
monitoring.
2. The business services manual has comprehensive budget development and monitoring guide-
lines, including a section that defines specific processes for budget tracking, maintenance and
monitoring throughout the year. The manual identifies departmental employees responsible for
budget such as deans, directors and others authorized to approve expenditures or modify the
budget (departmental budget holders). Departmental budget holders are expected to review bud-
get status reports monthly from the Datatel system and report any discrepancies to the business
office. Some departmental budget holders reported that they review their budgets more often.
Interviews revealed that departmental budget holders have online access to and receive a hard
copy of their budget reports from either the Business Services Department’s senior administra-
tive assistant or the department’s accountant. While departmental budget holders indicated they
reviewed their budgets for over expenditures, the example Account Availability reports provided
to FCMAT included budget lines where expenditures had exceeded budget amounts, and the ac-
count lines were not addressed in succeeding months. This primarily occurred in salary and ben-
efit expense lines but also in the 4000-5999 object codes. This indicates that not all departmental
budget holders adhere to the district’s policy of monthly review. The manual states that the de-
partmental budget holders “are individually responsible to ensure that they do not exceed their
authorized budget expenditures.” While the district has developed and provided tools and reports
for monitoring budgets, not all those responsible for budget management are using those tools.
62 ACCJC Standard III
3. The business services manual states that twice each fiscal year managers are offered campus-
wide budget review by the CBO and may request formal revisions or other adjustments to
individual allocations. This training did not occur in the 2012-13 fiscal year, although indi-
vidual training/assistance was available when requested.
4. Departmental budget holders are responsible for budget transfers, and the district has updated
the Budget Transfer Request form. Budget transfers continue to include the rationale/justifi-
cation for the transfer as well as supporting documentation, and the board receives this infor-
mation when budget transfers are presented for approval. Once signed by the requestor, they
receive at least one additional approval/level of scrutiny before reaching the CBO for signa-
ture. An Account Availability report is to be attached to each budget transfer for the CBO to
confirm available funding. The person entering the transfer in the financial system must also
sign the budget transfer form, include the transfer number on the form, and print a Budget
Journal Entry Detail Report to confirm the entry was made correctly.
5. The district’s accounting staff continues to meet with program directors/coordinators to re-
view program revenues and expenditures. These reviews occur at different frequencies de-
pending on the time of year, and assistance is available on an as needed basis.
6. The district uses two accounting systems, Datatel and PeopleSoft. Its partner, El Camino
CCD, requires the use of Datatel, and LACOE requires the use of PeopleSoft. The district
uses the Datatel system for budgeting and accounts payable, but the two systems do not au-
tomatically reconcile and only PeopleSoft is audited by the district’s external auditors. While
this has resulted in continued audit findings that were considered material weaknesses, the
audited financial statements for the year ending June 30, 2012 did not raise the concern to
that level as the district has begun reconciling the two systems.
Routine monthly reconciliations between systems are essential to ensuring that data is accu-
rately reflected in each system.
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 63
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 8.5 – Budget Monitoring
Professional Standard:
The college uses an effective position control system that tracks personnel allocations and expen-
ditures. The position control system effectively establishes checks and balances between personnel
decisions and budgeted appropriations.
Sources and Documentation:
1. Interview with the CBO
2. Interview with the dean of human resources
3. Interviews with payroll specialists
4. Administrative Regulation 6252, Position Control, June 10, 2009
5. Administrative Procedure 6252A, Position Control, June 28, 2010
6. Administrative Regulation 7112, Personnel Assignment Authority, March 15, 2010
7. Administrative Procedure 7112A, Personnel Assignment Processing, June 28, 2010
8. HRS Departmental Position Allocation List, March 28, 2013
9. Form 7112A, Personnel Assignment Request form, March 15, 2010
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has adopted, revised, and implemented regulations and procedures to appropri-
ately control and track positions. The administrative regulations detail the requirements for
obtaining approval to establish a new position or fill an existing position. The administrative
procedures detail the steps and workflow necessary to process the requirements and com-
municate the actions to the necessary departments. The process also incorporates a check and
balance system that ensures compliance and review of position control actions.
2. Every new position requires position control processing that includes establishing the posi-
tion and budget. The procedure includes the approved selection process and completion of
the assignment authorization process. Interviews with district administrators and staff, as
well as review of the district’s administrative procedures and regulations, reflect an appropri-
ate separation of duties in establishing a new employee. The Human Resources Department
inputs the demographic information for employees, which then drives the payroll functions.
Human resources staff cannot access the payroll information screens and payroll staff cannot
enter employee demographic information. Additional checks and balances in the administra-
tive procedures and regulations ensure that budgeting considerations are incorporated with
personnel decisions.
3. Review of the HRS Departmental Position Allocation List indicated that amounts for substi-
tutes and health and welfare payments for retirees were omitted. A reliable position control
system establishes positions by department or program and helps prevent over- or under-
budgeting by including all district-approved positions. In addition, a reliable position control
system prevents a district from omitting from the budget routine annual expenses such as
substitutes and estimated salary changes when employees move from one column to the next
on the salary schedule.
64 ACCJC Standard III
4. The district uses two systems for position control, Datatel and PeopleSoft. AP 6252A calls for
a budget technician to perform a weekly review of the differences between the two systems.
Documentation of these reviews and reconciliation are to be maintained for audit. The district
had assigned these duties to the manager of accounting who performed the review through
January 2012, when he left the district. This task has not been routinely performed since the
manager’s departure. However, interviews indicated that the interim director of accounting is
in the process of reviewing the two systems and establishing a reconciliation process.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 6
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard III 65
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 9.2 – Budget Communications
Professional Standard:
The college budget clearly identifies one-time sources and uses of funds.
Sources and Documentation:
1. Interview with the CBO
2. Board Policy 6250, Budget Management, September 15, 2009
3. Administrative Regulation 6251, Budget Management, February 17, 2009
4. Administrative Procedure 6251A, Budget and Expenditure Management, September 15, 2009
5. Budget to Actual Report for Enrollment Management and Auxiliary Services, April 17, 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district’s policies, regulations, and procedures define the process of budget planning, de-
velopment and monitoring.
2. The district has designated funds from the enrollment management and auxiliary services
programs for use as one-time funds. These funds are tracked by the district using program
codes 53 and 54, respectively, to identify expenditures that are one-time in nature. The dis-
trict has established an application process for those who wish to utilize the funds. The de-
partment/unit requesting the funds submits its application, which is reviewed by a committee
that makes the funding decision. The decisions of the committee are final.
3. Budget and ledger reports can be queried by the program code to identify status and reconcile
accounts. These reports showed that, during the 2012-13 fiscal year, approximately $103,000 in
funding was allocated to one-time expenditures for such items as student workers; non-instruction-
al temporary workers; and part-time counselors in Admissions/Records, Counseling, Student Re-
cruitment, First Year Experience and Student Services departments. It is unknown how much will
be allocated for similar expenditures in 2013-14. By using a specific code, the district effectively
identifies one-time expenditures and ensures that these items are contained within the fiscal year.
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 2
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 9
Implementation Scale:
66 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 11.1 – Attendance Accounting
Professional Standard:
An accurate record of enrollment and attendance is maintained.
Sources and Documentation:
1. Independent Audit Report, June 30, 2012
2. Certification 2011-12 Apportionment Attendance Report (CCFS-320) – First Period, 1/17/12;
Second Period, 4/20/12; Annual Period, 7/16/12
3. Certification 2012-13 Apportionment Attendance Report (CCFS-320) – First Period, 1/15/13;
Second Period, 4/19/13
4. Attendance Accounting Instructions for Spring 2013 (memo), February 7, 2013
5. Attendance Accounting Instructions for Spring 2013 (memo), April 1, 2013
6. FTES Goal and Actual, 2012-13
7. 2012-13 Final Budget, September 11, 2012
8. Printing Class Rosters on MyECC (procedures)
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD’s June 30, 2011 audit report found that the CCFS-323 report submitted by the
district for the 2010-11 fiscal year did not agree with the LACOE PeopleSoft enrollment fee
revenue as of June 30, 2011. The district’s independent audit report for June 30, 2012 did not
include any new or ongoing deficiencies. This suggests that the procedures implemented by
the district to ensure accuracy in all enrollment and attendance reports submitted to the state
are effective in preventing reporting errors.
2. A review of the 2011-12 CCFS-320 Apportionment Attendance report, Annual Period,
showed an increase of 375 full-time equivalent students (FTES) over the district goal of
6,000 FTES. This report is prepared by the El Camino CCD academic affairs analyst and is
reviewed and signed by the Compton CCD CEO.
3. There has been a substantial increase of students statewide wanting to enroll in the commu-
nity college system because of the state’s poor economic condition. At the time of FCMAT’s
last review, the state had published the 2012-13 May revised budget assumptions: Scenario A
(the governor’s November 2012 Proposition 30 tax initiative passes) and Scenario B (the tax
initiative fails). The district’s tentative budget for the 2012-13 fiscal year was based on Sce-
nario A and included 5,900 FTES. Proposition 30 passed in November 2012, and the district
continued using Scenario A for its budget assumptions.
4. The district follows El Camino CCD’s student drop policy for nonpayment. Students must
pay 100% of their fees within a specified period of time or they are automatically dropped
from the class roster. In addition, the district has contracted with the Franchise Tax Board for
the California Tax Offset Program. Under the terms of the agreement, unpaid student fees go-
ing back a number of years are automatically withheld from state refund checks.
ACCJC Standard III 67
Standard Implemented: Partially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 5
April 2013 Rating: 6
Implementation Scale:
68 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 11.5 – Attendance Accounting
Professional Standard:
Procedures are in place to ensure that enrollment and attendance accounting and reporting require-
ments are met for weekly student contact hours (WSCH), daily student contact hours (DSCH), credit,
non-credit, high school concurrent enrollment, and positive attendance.
Sources and Documentation:
1. Independent Audit Report, June 30, 2012
2. Compton CCD Employee’s Policy and Procedures Handbook
3. Annual Financial and Budget Report - Form CCFS-311 Master Report (not signed or dated);
CCFS-311Q Q4, 2011-12; CCFS-311Q, Q1 and Q2, 2012-13
4. Certification 2012-13 Apportionment Attendance Report (CCFS-320) – First Period, January
15, 2013
5. Certification 2011-12 Apportionment Attendance Report (CCFS-320) – Annual Period, July
16, 2012
6. Actual Enrollment Fee Revenue Reports (CCFS-323) - P1 and P2, 2012-13; Recalc, 2011-12
7. 2012-13 Final Budget, September 11, 2012
8. Board meeting agendas
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD utilizes El Camino CCD’s student enrollment, registration and attendance
processes, forms and systems. The CCFS-320 Apportionment Attendance reports are pre-
pared by the previous El Camino academic affairs analyst, who now works for another local
educational agency and contracts with El Camino CCD to complete these reports. The CCFS-
323 Enrollment Fee Revenue reports are prepared by Compton CCD.
2. The 2011-12 Annual Financial and Budget Report, Form CCFS-311 Master Report, includes
a cover page that is to be signed and dated by the CBO and the superintendent or CEO. Nei-
ther signature was included on the document provided to FCMAT, nor was the date the report
was submitted to the state.
3. The 2012-13 CCFS-323 reports submitted for P2 (April 15, 2013) and P1 (January 15, 2013)
were appropriately signed by the CBO, whereas in the past the director of fiscal affairs signed
these reports. The P2 report was submitted timely; however, the P1 report was certified one
day late. The process has improved from last year, with proper segregation of duties.
The accuracy of total cumulative enrollment reported on the P1 and P2 reports also has im-
proved. In the prior review period, the P1 report had a larger revenue amount than P2, which
is not accurate because it is a cumulative report. The P1 and P2 reports filed for 2012-13 in-
clude reasonable cumulative enrollments, with P1 revenue less than that reported on the P2.
4. The 2010-11 annual independent audit report included finding 2011-1, which indicated that
state apportionment and related student enrollment fees were not properly accounted for and
ACCJC Standard III 69
that $524,000 was owed back to the state from the district’s unrestricted general fund. No
such finding was included in the 2011-12 annual independent audit report. The district should
ensure that annual training for attendance personnel is conducted to help ensure proper atten-
dance accounting and reporting.
5. Compton CCD’s 2012-13 Final Budget indicates 5,900 budgeted FTES. Item 3A of the Feb-
ruary 19, 2013 board meeting agenda indicated budgeted FTES of 5,960. Documentation
reviewed by FCMAT did not identify that a change in FTES was presented and approved by
the board/special trustee.
The 2012-13 CCFS-320 P2 was calculated at 5,960 resident FTES. This is a reduction from
the 6,375 FTES served in 2011-12. Compton CCD based its budget on information available
from the State Chancellor’s Office prior to the November 2012 election. The district stated in
an August 31, 2012 letter to the special trustee, which was included in the Final Budget, “The
State budget may be modified after the November election and once state revenue calcula-
tions are completed. If changes need to be made to the Compton Community College District
budget, it will be brought back to the Special Trustee for consideration.”
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 5
Implementation Scale:
70 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.2 – Accounting, Purchasing
and Warehousing
Professional Standard:
The college timely and accurately records all information regarding financial activity (unrestricted
and restricted) for all programs. Generally Accepted Accounting Principles (GAAP) requires that
for financial reporting to serve the needs of the users, it must be reliable and timely. Therefore, the
timely and accurate recording of the underlying transactions (revenue and expenditures) is an essen-
tial function of the college’s financial management.
Sources and Documentation:
1. Interview with the CBO
2. Independent Audit Report, June 30, 2012
3. Financial Report as of March 31, 2013, generated from PeopleSoft
4. 2012-13 Requisition Cut-Off Dates memorandum to all staff, March 20, 2013
5. 2012-13 Requisition Cut-Off Dates, Year-End Closing and Budget Freeze memorandum to
all staff, March 1, 2013
6. 2012-13 Year-End Task List and individual staff responsibility
7. List of budget analyst duties
8. Email communications from CBO, May 7, 2013
9. Reconciliation between Datatel and PeopleSoft, various accounts
Progress on Implementing the Recommendations of the Recovery Plan:
1. The annual independent audit report for the year ending June 30, 2011, included a mate-
rial weakness finding with the posting of journal entries and other transactions that required
significant reclassifications and accounting corrections. This finding was not repeated in the
2011-12 independent audit report, indicating improvement. Interviews indicated that the in-
terim director of accounting or the CBO now reviews and approves all journal entries before
they are posted to the financial system.
2. Districts are required by the California Community Colleges Chancellor’s Office Budget and
Accounting Manual (BAM) to properly classify expenditures using four-digit activity codes
as described in the Taxonomy of Programs (TOPS) manual. The June 30, 2012 independent
audit report finding 2012-3 indicates that for the 2011-12 fiscal year, many instances of in-
correct TOPS coding were found and corrected for audit purposes, but not corrected in the
district’s financial system. The misclassification of activity could directly affect the 50% law
calculation. Interviews indicated that staff training on the BAM had not yet occurred. The
district should ensure that all applicable staff members are trained.
3. The 2011-12 audit report included a noteworthy decrease in findings and recommendations,
many related to fundamental accounting issues. The number of findings decreased from 26 in
2010-11 to 13 in 2011-12, demonstrating improvement.
ACCJC Standard III 71
4. Several federal programs that include Financial Aid, Federal Work Study, Pell and Supple-
mental Educational Opportunity Grant programs that benefit Compton CCD students are sub-
ject to joint oversight by El Camino’s and Compton’s business offices. El Camino CCD has
been collecting the entire indirect cost for co-administering these programs. As recommended
in the prior review period, the district should consult with its independent auditors regarding
this practice to ensure it meets generally accepted accounting principles (GAAP).
5. Individual departments may print financial reports but also receive an emailed copy monthly
from the business office. Accounting staff meet with department chairs and directors to re-
view budget issues at key intervals during the fiscal year and are available on an as needed
basis to answer questions.
6. All staff were notified on March 1, 2013 of a March 29, 2013 unrestricted general fund
purchasing cutoff, and on March 20, 2013 of an April 30, 2013 restricted general fund and
categorical purchasing cutoff. Staff did not possess the LACOE 2012-13 Year-End Closing
Manual at the time of this review because it had not yet been published. The CBO indicated
that staff will attend the LACOE year-end training for 2012-13. District staff did not use a
documented checklist for the 2011-12 year-end closing; however, the CBO used the previous
year’s audit report, categorical closing schedules, and the LACOE year-end closing manual.
The district has prepared a year-end closing schedule for 2012-13.
7. The Business Services Department has experienced improved stability in the work environ-
ment and reduced staff turnover during this review period. Staff indicated an improvement in
their comfort level and knowledge of individual responsibilities from that noted during prior
review periods.
LACOE provides written procedures for monthly/annual closing processes, and the Business
Services Department has begun developing written processes and procedures for individual
tasks that are published and accessible on a shared network drive. The CBO has expressed
his intent to continue the progress in this area; however, Business Services staff do not yet
have complete desk manuals with written procedures for individual tasks.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 3
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 5
Implementation Scale:
72 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.3 – Accounting, Purchasing
and Warehousing
Professional Standard:
The college forecasts its revenues and expenditures and verifies those projections monthly to ad-
equately manage its cash. In addition, the college reconciles its cash to bank statements and reports
from the county treasurer monthly. Standard accounting practice dictates that, to ensure that all cash
receipts are deposited timely and recorded properly; cash is reconciled to bank statements monthly.
Sources and Documentation:
1. Interview with the CBO
2. Financial reports generated from PeopleSoft and Datatel systems
3. Independent Audit Report, June 30, 2012
4. Sample student fee deposit records, January 2-31, 2013
5. Bursar’s Department – Policies & Procedures, draft February 1, 2013
6. Revolving Fund – Policies & Procedures, draft February 1, 2013
7. $30 million loan debt service schedule
8. Bank reconciliations for various accounts, April 2012
9. Bank reconciliation for various accounts, April 2012, July 2012, October 2012, December
2012, and January 2013
10. 5-Year budget, updated November 26, 2012
11. Administrative Regulation 6301, Cash Receipt and Handling, February 17, 2009
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Business Services Department management staff oversees cash management for the
district. The CBO reported that he reviews cash daily and updates the cash flow projection
monthly to reflect prior month actuals. A two-year cash flow projection was completed in
January and March 2013. Reconciliation of bank statements is scheduled to be performed
monthly by the business services accountant. The strength and technical knowledge of the
department’s management team has increased with the recent hire of the interim director of
accounting who has accounting and auditing background specifically related to the district.
2. A sample review of revolving fund bank reconciliations indicate they are not being com-
pleted in a timely manner. For the months of July and October 2012, US Bank account 1888
reconciliations were prepared on February 25, 2013 and reviewed on April 2, 2013. The rec-
onciliation prepared for the December 2012 bank statement did not contain a reconciliation
date, but was reviewed on April 2, 2013. The district should ensure bank reconciliations are
reconciled and reviewed monthly to identify and resolve any issues timely and to maintain
better cash management and internal control. The CBO has assigned the oversight of this
function to the new interim director of accounting, which should help improve the consis-
tency in timely reconciliation and review.
3. All cash is collected at the Bursar’s Office and deposited into the clearing account. AR 6301
states, “The CCCD commercial clearing account balance is to be transferred to LACOE not
ACCJC Standard III 73
less than weekly and more often whenever the balance reaches $90,000 in order to ensure
the district is receiving interest on its unused funds.” The draft Bursar’s Department – Poli-
cies & Procedures mirror AR 6301. FCMAT reviewed a sample of student fee deposit records
for the month of January 2013 and found that the district made one $131,100 deposit for the
entire month. The district should ensure that deposits are prepared timely and are made in ac-
cordance with AR 6301. The sample student fee deposit records and reconciliation reviewed
by FCMAT contained the signature of the CBO indicating that it had been appropriately re-
viewed and approved.
Journal entries are prepared for collections, and a check is prepared for deposit to the County
Treasurer’s Office. All deposits to the County Treasurer and related journal entries are re-
viewed and signed by the CBO prior to deposit and posting to the district’s system of record
(PeopleSoft).
4. AB 318 was approved by the governor in June 2006 and appropriated $30 million to the dis-
trict as an emergency apportionment for cash flow purposes. This is considered to be a line
of credit against advance apportionments, subject to repayment with interest. To date, the
district has drawn down three installments totaling approximately $17.9 million. Annual pay-
ments of $1,292,420 are due on June 1 of each fiscal year. The outstanding debt as of June
30, 2012 is estimated at $15.45 million. There are no immediate plans to access the line of
credit.
5. The district staff presented the 20-year debt service schedule, based on the total draws to date
of $17.9 million, to the board on March 16, 2010. The CBO also updated the multiyear fi-
nancial projection spreadsheet with underlying assumptions to support cash requirements for
operations that included an annual debt service payment of $1,292,420 for the line of credit.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 2
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
74 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.4 – Accounting, Purchasing
and Warehousing
Legal Standard:
The college’s payroll procedures are in compliance with established requirements (Education Code
Section 85241). Standard accounting practice dictates that the college implements procedures to en-
sure the timely and accurate processing of payroll.
Sources and Documentation:
1. Interview with the CBO
2. Interviews with payroll specialists
3. LACOE HRS District Payroll Schedule reports from PeopleSoft, June 2012 – April 2013
4. Sample pay earning detail reports
5. Administrative Regulation 6311, Attendance and Time Reporting, June 16, 2009
6. Employee work calendar, 2012-13
7. Payroll Department – Policies and Procedures, draft February 1, 2013
8. Payroll Audit Registers, classified March 8, 2013 and certificated March 5, 2013
9. Sample payroll deduction reports
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Payroll Department has demonstrated improvement in payroll processing. However, in-
terviews indicated that the department continues to lack consistent oversight and supervision.
Interviews with staff indicated that district management only occasionally reviews and ap-
proves payrolls submitted to LACOE. Review and approval of all payroll reports by district
management, prior to submission to the county office, is essential for proper internal controls
and to protect district assets.
2. Human Resources and Payroll department staff meet monthly to discuss board agenda items,
LACOE issues, PERS/STRS matters, and process improvement. These meetings are vital to
continue to reduce the number of payroll errors. During this reporting period, management
and staff indicated the number of payroll errors continues to decline, and those that do occur
are corrected immediately. Payroll specialists also continue to regularly attend training events
at LACOE.
3. Interviews indicated that payroll staff have begun to receive copies of new employee con-
tracts during this review period. Payroll staff should routinely compare the information in all
new employee contracts with information reported on timesheets to ensure that new employ-
ees are being compensated appropriately and to further reduce payroll errors.
4. Payroll and benefits are processed through an interface between the HRS position control system
and both Datatel and PeopleSoft financial reporting systems. Posting in two financial systems
creates timing differences that must be reconciled when the district reports state-required finan-
cial activities, budget and variance reports. This reconciliation process is performed manually;
however, the district is investigating technologies that could make the process more efficient.
ACCJC Standard III 75
5. Interviews indicated that the El Camino CCD vice president now includes a position control
number on all contracts. If the position control number is not on the contract, payroll staff
verifies the position with the vice president directly prior to inputting payroll.
6. Interviews with staff indicated there is an inconsistency in completing reconciliations be-
tween position control and payroll records. In previous reviews, issues with the timing and
posting of all payroll transactions had been addressed through a monthly reconciliation pro-
cess between position control and payroll records. This requires the district to devote addi-
tional staff time to ensure timely reconciliations and accurate reports to the state. A monthly
HRS Position Control Discrepancy Report was requested but not provided to FCMAT. Al-
though the CBO reported that the district is working on implementing a quarterly reconcili-
ation process, the district should review and reconcile position control and payroll records
monthly and resolve any discrepancies timely to improve maintenance of position control
and reduce payroll errors.
7. Department supervisors authorize overtime and compensatory time. Administrative Regula-
tion 6311, Attendance and Time Reporting, describes the regulations that the district must
adhere to. The district had developed a draft Payroll Department – Policies and Procedures
document dated February 1, 2013. Interviews with the CBO and staff indicated that these
new policies and procedures are accessible to business office staff through a new Business
Services shared network drive.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
76 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.5 – Accounting, Purchasing
and Warehousing
Professional Standard:
Standard accounting practice dictates that the accounting work is properly supervised and work
reviewed to ensure that transactions are recorded timely and accurately, and allow the preparation of
periodic financial statements.
Sources and Documentation:
1. Interview with the CBO
2. Interviews with Business Services Department staff
3. Independent Audit Report, June 30, 2012
4. Financial reports as of March 31, 2013 from PeopleSoft
5. Administrative Regulation 3601, Auxiliary Organization Protocols, March 16, 2010
6. Master Agreement between Compton CCD and Foundation for Compton CCD, June 28, 2011
7. 311Q, Quarters 1 and 2 2012-13, Quarter 4 2011-12
8. Accounts Payable Department – Policies and Procedures, October 16, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The high turnover of management staff in the Business Services Department in past years re-
sulted in an overall lack of oversight and guidance in accounting activities. Finding 2011-2 in
the 2010-11 independent audit report, and finding 2012-5 in the 2011-12 independent audit re-
port, also indicate a historical lack of continuity in the business office. After the 2011-12 audit
report (dated December 7, 2012) was issued, the district hired an interim director of accounting.
During this review period, interviews indicated that the business office is beginning to experi-
ence consistency in business practices and oversight. Interviews with staff further identified
an improved confidence in the district’s administration. Documentation provided to the review
team also indicates improvement in management review and approval of work performed by
business office staff, and staff reported that the CBO routinely requests supporting documenta-
tion and/or clear explanation from staff regarding their work during his review process.
2. Staff members reported that quarterly financial statements are now developed, reviewed and
approved by management before distribution.
Finding 2011-20 in the 2010-11 audit report and finding 2012-11 in the 2011-12 audit report
indicate that the Child Development Care and Block Grant’s final annual report detailing the
activity for the year did not agree to the district’s financial records, indicating that manage-
ment review may not have always occurred during those time periods. Interviews with staff
indicated that in the past management had not reviewed these reports regularly, but that this
has changed during this review period, and management now reviews all reports before they
are distributed. FCMAT noted management approval on many of the documents provided
during this review period, demonstrating an improvement in this process. Each report pre-
pared for submission to any agency must be reviewed by management to help ensure accu-
racy and confirm that all costs associated with the program are included.
ACCJC Standard III 77
3. The CBO and the new interim director of accounting are developing and implementing op-
erational processes and procedures for business office tasks, and several of these documents
were provided to FCMAT. Interviews with Business Services Department staff also con-
firmed an increase in management oversight of their work.
4. The district has established an administrative regulation that outlines the distribution of rev-
enue associated with enterprise activities. AR 3601, Section XIX, states the following:
To the extent that the bookstore, food services, and campus vending services generate
a net profit, after deducting district expenses for maintenance and utilities, the funds
may be deposited in the following auxiliary organization accounts: 50% of the net
funds may be deposited in the Associated Student Body for Compton Community Col-
lege District accounts; 25% of the net funds may be deposited in the Auxiliary Services
fund to support student programs as designated by the Auxiliary Services committee
and approved by the CEO; and the remaining 25% of the net funds may be deposited in
the Foundation for the Compton Community College District accounts to be used for
student scholarships (see AR 3602 Student Scholarships), the Academic Awards Tea
and graduation related expenses.
Proceeds received from student enterprise activities now go directly to the Bursar’s Office
and are deposited in the district accounts at the County Treasurer. In addition, the June 28,
2011 Master Agreement between the Compton CCD and Foundation for Compton CCD in-
dicates that the foundation is a non-profit organization existing pursuant to state laws and the
Internal Revenue Code Section 501(c)(3). The master agreement indicates that funds may be
disbursed to the associated student body (ASB), Foundation and Auxiliary as described in
the paragraph above. Based on review of account activity during this review period, no such
disbursement to these funds had occurred for the 2012-13 fiscal year. However, subsequent
to FCMAT’s fieldwork, the district provided documentation indicating this disbursement had
been made at the end of April 2013. Management should provide ongoing routine oversight
of all accounting activities and ensure funds are properly and regularly disbursed.
5. All managers have been trained to print their department financial reports. The business of-
fice continues to distribute financial reports to each manager after the monthly close. Ac-
counting staff is responsible for specific departments and charged with assisting those manag-
ers with budget issues or concerns.
6. The district needs to continue to develop and implement a plan to attract, support and retain
highly qualified candidates for open district positions, particularly those in the Business Ser-
vices Department, to make and sustain progress in the comprehensive financial standards.
Last year the district filled the vacant CBO position. The CBO has been actively improving
oversight in the business office, providing guidance and training to staff, and establishing
improved business practices by developing and implementing operational processes and pro-
cedures for several operational areas in the department. These processes and procedures are
easily accessible by business office staff on a Business Services shared network drive. During
this review period, the district hired an interim director of accounting and, at the time of
FCMAT’s fieldwork, was working through the process of making this a permanent position.
78 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 5
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 79
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.7 – Accounting, Purchasing
and Warehousing
Professional Standard:
Generally accepted accounting practices dictate that, to ensure accurate recording of transactions,
the college have standard procedures for closing its books at fiscal year-end. The college’s year-end
closing procedures should comply with the procedures and requirements established by the Chancel-
lor’s Office.
Sources and Documentation:
1. Interview with the CBO
2. Interviews with Business Services Department staff
3. 2010-11 LACOE Year-End Closing Procedures and Schedules – PeopleSoft system (current
year not issued as of date of review)
4. 2012-13 Year-End Task List and individual staff responsibility
5. 2012-13 Requisition Cut-Off Dates, and Year-End Closing and Budget Freeze memo, March
1, 2013
6. 2012-13 Requisition Cut-Off Dates memo, March 20, 2013
7. Independent Audit Report, June 30, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. Memos and procedures for purchasing and cut-off dates have been shared with district em-
ployees. The district follows year-end closing procedures and schedules for PeopleSoft sys-
tems established by LACOE. During the review, FCMAT did not find evidence of written
year-end institutional procedures; however the CBO used the previous audit reports, categori-
cal closing schedules, and the LACOE year-end closing manual to assist with the 2011-12
closing process.
2. Interviews indicated that Business Services Department staff members are looking for direc-
tion regarding their responsibilities in the 2012-13 year-end closing process. The district has
prepared a year-end task list indicating individual staff responsibility for 2012-13. Oversight
in this area has improved with stability in the CBO position and the addition of the interim
director of accounting.
3. Findings in the 2011-12 audit were significantly reduced from the 2010-11 audit, going from
26 findings in 2010-11 to 13 findings in 2011-12. The 2011-12 audit report included finding
2012-4 related to year-end closing and indicated there was insufficient management oversight
and staff training to maintain timely reconciliations of activity throughout the year. During
this review period, documentation was provided to support some ongoing reconciliations;
however, some are still not completed timely as discussed in Standard 12.3.
4. The CBO should continue to provide strong guidance, oversight and supervision for the year-
end closing and play an active role in the process, assisting staff when necessary.
80 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 0
June 2009 Rating: 2
January 2010 Rating: 4
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 81
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 12.9 – Accounting, Purchasing
and Warehousing
Professional Standard:
The college has documented procedures for the receipt, expenditure and monitoring of all construc-
tion-related activities. Included in the procedures are specific requirements for the approval and pay-
ment of all construction-related expenditures.
Sources and Documentation:
1. Board meeting agendas and minutes
2. Board Policy 6330, Procurement, February 17, 2009
3. Administrative Regulation 6331, Procurement, February 17, 2009
4. Board Policy 6340, Contracts, June 16, 2009
5. Administrative Regulation 6302, Accounts Payable, February 17, 2009
6. Board Policy 3300, Capital Construction, April 20, 2010
7. Accounts Payable Department – Policies and Procedures, October 16, 2012
8. Board Resolution: Election to Become Subject to the Uniform Public Construction Cost
Accounting Procedures, January 19, 2010
9. Purchasing Department - Policies and Procedures, revised February 1, 2013
10. Draft Equipment Purchase Guidelines, February 19, 2013
11. Bid Threshold & Bond Requirements, September 20, 2011
12. Compton CCD Measure CC General Obligation Bond Audit Report, June 30, 2012
13. Notice of Prequalification – RFQ #CCCD/Qual-0001
14. Notice of BID – Bid #CCC-010A
15. Notice of RFP – RFP #CCC-015
16. Closed Session Report regarding RFP #CCC-015, July 19, 2012
17. Notices of Intent to Award – Bid CCC-010A, February 22, 2012
18. Award letter – Bid CCC-010A, May 9, 2012
19. Approval of Prequalification Rating System
20. Notice to Proceed – Bid CCC-010A, Pinner Construction Co., June 8, 2012
21. NTD Architecture purchase orders
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district’s Measure CC general obligation bond financial statement findings for the year
ending June 30, 2012 indicated no deficiencies or material weaknesses. The report included
one finding, which is a decrease over the previous year’s report that included seven findings.
The finding was for an instance of noncompliance related to Proposition 39 Article XIIIA,
Section 1(b)(3)(C) of the California Constitution to form a Citizens’ Oversight Committee to
review progress on the construction projects. The committee only met twice during the fiscal
year 2011-12, instead of the required three times.
2. Significant deficiencies noted in the 2010-11 independent performance audit report revealed
that approval of purchase orders was not obtained before the start of construction work; pay-
ment process sheets were not signed by Business Services Department staff and payments
82 ACCJC Standard III
were made to the vendors in excess of 90 days from the receipt of goods and services; and al-
location of costs between the state and the bond funds was not documented for jointly funded
construction projects. These deficiencies were corrected in the 2011-12 fiscal year and are no
longer reported in the audit.
Interviews with staff and review of documentation, including the draft equipment purchase
guidelines, accounts payable department policies and procedures, purchase orders for NTD
Architecture, and the independent performance audit report, for the period ended June 30,
2012, indicated improvement in the processes in place to address these issues. Consistency
in key management level positions has also contributed to improved oversight. The district
has established accounts payable policy and procedures for capital and bond expenditures
that specifically require all capital and bond expenditures to be reviewed and approved by the
CBO and/or designated individuals; and further require specific payment processing forms
that identify invoices as Measure CC & State Capital Outlay Projects. The district has evalu-
ated staff for training needs, has begun establishing written procedures for the Business Ser-
vices Department, and is working to ensure that adequate supervision is provided.
3. The Utilities Infrastructure Phase I stadium lighting and central plant project was properly
documented from Prequalification Notice, to project bid notification, to board/special trustee
approval for publication of bid notification and bid results, notice of intent to award, award
letter, and notice to proceed. Bid and award notification documents were provided to FCMAT
for review, and indicate compliance with the district’s construction purchasing guidelines.
Construction was evident throughout the campus during FCMAT’s fieldwork.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 4
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard III 83
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 13.1 – Student Body Funds
Professional Standard:
The Governing Board adopts policies and procedures to ensure compliance regarding how student
body organizations deposit, invest, spend, raise and audit student body funds.
Sources and Documentation:
1. Interviews with Business Services Department staff
2. Interview with the CBO
3. Quarterly Financial Statement, March 31, 2013
4. Associated Student Body Finance Code and Procedures Manual
5. General ledger detail trial balance, July 2012– March 2013
6. Bank reconciliations for various accounts, July, October, December 2012, and January 2013
7. Account closure letter, US Bank accounts 1847, 1854, 1862, January 11, 2011
8. Check issued to ASB for commission revenue, May 6, 2013
9. Administrative Regulation 3601, Auxiliary Organization Protocols, March 16, 2010
Progress on Implementing the Recommendations of the Recovery Plan:
1. The business office is responsible for oversight of elements of internal control. The business
office has developed an Associated Student Body Finance Code and Procedures Manual to
provide written guidance on various operational procedures and best practices. The following
sections are included in the manual along with sample forms for reference:
a. ASB monies are fully segregated in commercial bank accounts in accordance with FDIC
rules and regulations.
b. Bank reconciliations are performed timely by an accountant and approved by the account-
ing manager.
c. Staff separation of duties is maintained.
d. Check stock is controlled and in a secure location.
e. All checks require dual signatures for processing.
f. Disbursements require authorized and approved purchase requisitions and/or resolutions.
g. Disbursements cannot be made in advance of the delivery of goods or services.
h. Use of credit cards, revolving funds or any other form of district funds is not permitted.
i. The ASB budget must be approved by the council.
j. Adequate funding must exist prior to disbursement of payment.
k. All revenues must be recorded in the bursar’s office.
l. Making or receiving loans is prohibited.
m. The director of student life authorizes Datatel reports on transactional detail by request.
84 ACCJC Standard III
2. Management oversight has increased since the last review period, which has helped to im-
prove processes in the department. Journal entries, financial statements and bank reconcili-
ations are completed with management’s oversight. Bank reconciliations are performed for
each statement, but not always timely. Some of the reconciliations provided to FCMAT were
not date stamped until February 2013 or after and were reviewed by district staff in April
2013; others were not dated, so it is unknown when they were completed. Management
should require staff to complete bank reconciliations within 30 days to help provide for early
identification of questions/concerns and better cash management.
3. As previously discussed in Standard 12.5, the district has established AR 3601, which out-
lines the distribution of revenue associated with enterprise activities. Interviews and AR 3601
indicate that a percentage of bookstore, vending and cafeteria commission is to be provided
to and recorded in the ASB account. Previously, the commissions were being forwarded to
the Foundation for Compton CCD, and the foundation was responsible to issue payment to
the ASB. Interviews with staff indicated the funds are now being deposited at the Bursar’s
Office and funds are remitted quarterly to the ASB. However, no commission revenues were
posted as of the March 31, 2013 statement of revenues and expenses. Subsequently, a check
was issued to ASB for 50% of the commissions received as of April 29, 2013. Because the
funds are to be provided to the ASB quarterly, this indicates a lack of control over the activi-
ties, oversight and enforcement of ASB accounts and should be immediately addressed by the
district.
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 9
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 85
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 13.4 – Student Body Funds
Professional Standard:
Monitoring is performed by the Business Services Office to provide adequate oversight of student
funds and to ensure proper handling and reporting.
Sources and Documentation:
1. Interviews with Business Services Department staff
2. Interview with the CBO
3. Quarterly Financial Statement, March 31, 2013
4. Associated Student Body Finance Code and Procedures Manual
5. General ledger detail trial balance, July 2012 – March 2013
6. Administrative Regulation 3601, Auxiliary Organization Protocols, March 16, 2010
7. Trial Balance 2013 General Fund Object Summary through period 9, April 1, 2013
8. ASB bank reconciliation, US Bank account 6757, April 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The business office has developed a comprehensive Associated Student Body Finance Code
and Procedures Manual for ASB staff. The manual includes detailed sections for each ac-
counting area, forms and examples for the ASB accountant.
2. Quarterly financial statements and a general ledger summary trial balance are completed and
are reviewed by management staff. Journal entries and bank reconciliations are also com-
pleted and reviewed by management, but documentation provided to FCMAT indicates that
these reconciliations are not always performed timely, as discussed previously. A formal set
of financial statements including a balance sheet, profit and loss statement and other required
reports are distributed to the director of student life, dean of student services and the business
office, after management review.
3. At the time of FCMAT’s fieldwork, transactions for expenditures and revenues were posted
on the Datatel financial system twice monthly. Disbursement requests required four signa-
tures and checks required two signatures.
4. Interviews with staff demonstrated a clear understanding regarding the agreements associated
with fundraising activities and the distribution of proceeds between the ASB and foundation.
Interviews with staff and management indicated that the policies and procedures in the ASB
procedures manual have been implemented and are followed. However, as indicated in Stan-
dard 13.1, commission revenues are not submitted to the ASB timely.
86 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 8
July 2010 Rating: 9
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard III 87
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 14.2 – Multiyear Financial Projections
Professional Standard:
The college annually provides a multiyear revenue and expenditure projection for all funds of the
college. Projected fund balance reserves are disclosed. The assumptions for revenues and expendi-
tures are reasonable and supportable.
Sources and Documentation:
1. Interview with the CBO
2. Five-Year Budget Projection Assumptions (2011-12 through 2016-17) – Unrestricted General
Fund, November 26, 2012
3. Five-Year Budget Projections (2011-12 through 2016-17), undated
4. Unrestricted General Fund Preliminary Budget 2013-14
5. 2012-13 Budget to Actual Variance by sub-major object code, as of March 31, 2013
6. Independent Audit Report, June 30, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. The CBO has developed a spreadsheet containing a five-year model for unrestricted general
fund multiyear projections. These projections allow the district to analyze the effects of as-
sumptions over multiple years for changes in FTES, revenue and expenditures. This informa-
tion also gives management time to make necessary budgetary adjustments to ensure that the
district maintains an adequate fund balance and fiscal solvency. The spreadsheet has been
posted on the district’s website; however, the online version is dated August 29, 2012 and
should be updated as necessary to parallel the version currently being used by the district.
The need for budgetary information for multiple years was also recognized by the district’s
auditors and formalized in finding 2012-1 from the audited financial statements for 2011-12.
2. Compton CCD began preparing budget assumption details for use in a multiyear financial
projection for the unrestricted general fund for the 2011-12 through 2016-17 fiscal years in
July 2012. The assumptions were reviewed by the Planning and Budget Committee, Comp-
ton and El Camino CCD senior management, Compton Consultative Council and Compton’s
Board of Trustees from July 31 to September 11, 2012.
3. In reviewing the assumptions used in the spreadsheet, FCMAT noted the following items:
• The funded COLA for 2014-15, 2015-16 and 2016-17 was budgeted at 0% while School
Services of California’s dartboard estimated funded COLAs of 2.3%, 2.5% and 2.7%,
respectively.
• The district estimates a range of funded FTES for each year in the projection; however,
rather than taking a conservative approach and using the lesser amount, the district has
chosen to use a number larger than the range listed in 2012-13, 2013-14 and 2014-15. For
2015-16 and 2016-17, the largest number in the range has been used.
• Assumptions used for estimating lottery funds were not evident in multiyear projection as-
sumptions. Multiyear assumptions should be considered and communicated for all ongoing
88 ACCJC Standard III
revenue sources.
• The district elected to receive mandated costs funding for 2012-13 using the Mandated
Cost Block Grant funding election, which is established at $28 per FTES for the 2012-13
fiscal year. Multiyear assumptions pertaining to this funding source were not evident in the
documentation provided. Multiyear assumptions should be considered and communicated
for all ongoing revenue sources.
• Assumptions regarding enrollment fee and non-resident fee revenue were missing.
• Many assumptions were conservative to avoid overestimating revenues such as assuming:
• No additional redevelopment agency (RDA) funding for years beyond 2012-13.
• No parking fee revenue for years beyond 2012-13.
• No local revenue for years beyond 2011-12.
• No increases in expenditures for the following were noted during the period from 2012-13
to 2016-17 when the consumer price index (CPI) for this same period is at a minimum of
2.3% per year:
• Books, supplies and materials.
• Travel, conference and training.
• Dues and memberships.
• Contracts, rentals and repairs.
• Other services, postage and advertising.
• The assumptions noted that the district had a Public Agency Retirement System Alterna-
tive Retirement System Plan (PARS) obligation of five annual payments of $109,842 per
year; however, the budget projections showed six annual payments of $109,000.
The spreadsheet tracks the ending fund balance, designated fund balance, projected contin-
gency and ending balance reserve, and surplus/(deficit) in annual spending. While the online
version of the spreadsheet does not show this, the version that the CBO uses also tracks the
50% law projection both in terms of the percentage of the cost of education and the dollar
amount of additional instructional expenditures needed to meet the 50% threshold. While the
district met the 50% law in the 2012-13 year, the spreadsheet shows that it will not meet the
law in the forecasted years by 1.9 - 3.49%, depending on the fiscal year.
4. A prior district CBO developed a budget to actual variance report by sub-major object code.
This variance analysis report allows management to see trends in revenue and expenditure
patterns. When such an analysis is performed throughout the fiscal year, it allows unspent
funds to be redirected to further support academic programs and/or areas of overspending to
be addressed.
The district has continued to use the report, and the copy provided to FCMAT for the current
review period included a summary that reflected a monthly analysis of actual expenditures
from October 2012 through March 2013. The summary showed that the district’s expendi-
tures average approximately $2,357,000 per month and that the month of February 2013 ex-
perienced an increase of approximately $484,000 above the average. As of March 31, 2013,
the district has received approximately 53% of its revenues and spent 60.6% of its budget.
ACCJC Standard III 89
Standard Implemented: Partially
April 2007 Rating: 0
January 2008 Rating: 0
July 2008 Rating: 0
June 2009 Rating: 1
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 2
April 2013 Rating: 4
Implementation Scale:
90 ACCJC Standard III
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 15.1 – Long-Term Debt Obligations
Professional Standard:
The college complies with public disclosure laws of fiscal obligations related to health and welfare
benefits for retirees, self-insured workers’ compensation, and collective bargaining agreements.
Sources and Documentation:
1. Interview with the special trustee
2. Interview with the CEO
3. Interview with the CBO
4. Total Compensation Systems, Inc. Actuarial Study of Retiree Health Liabilities as of March
1, 2011
5. Bay Actuarial Consultants Actuarial Review of the Compton CCD Workers’ Compensation
Program, May 20, 2011
6. Independent Audit Report, June 30, 2012
7. Unrestricted General Fund Preliminary Budget 2013-14
8. 2013-14 Underlying Tentative Budget Assumptions
9. Collective Bargaining Agreement – CCC Federation of Classified Employees, July 1, 2009
through June 30, 2012
10. Collective Bargaining Agreement – CCC Federation of Employees Certificated Unit, July 1,
2010 through June 30, 2013
11. Memorandum of Understanding between the Compton Community College District,
Compton Community College Academic Senate and the CCC Federation of Employees
Certificated Unit, November 27, 2012
12. Memorandum of Understanding between the Compton Community College District and the
CCC Federation of Employees Certificated Unit, November 27, 2012
13. Board meeting agendas and minutes
Progress on Implementing the Recommendations of the Recovery Plan:
1. Compton CCD contracted with Bay Actuarial Consultants for an actuarial study of its self-
insured workers’ compensation program; however, the updated study is not scheduled to be
finalized and available until June 30, 2013, after FCMAT’s fieldwork for this review period.
Without an updated study, the liability was determined and remains unfunded according to
the May 20, 2011 study. The current liability of the unpaid losses reported on the annual fi-
nancial audit is $2,356,498 and reflects an estimated liability of $2,008,551 using an assumed
2% interest rate. The district’s independent annual audit report for the year ending June 30,
2012 reports the liability balance in Note 12 at $2,009,000, which reflects the rounding of the
$2,008,551 figure. The liability balance of $2,009,000 is then combined with amounts report-
ed in Note 10 for the long-term portions of the early retirement incentive, bond premium and
other postemployment benefits to be reported as other long-term obligations of $5,284,687 on
the Statement of Net Assets. However, Note 12 to the audited financial statements continues
to report the actuarial study date of June 7, 2007 using a 3% discount level, which should
have been reported as May 20, 2011 and a 2% discount level.
ACCJC Standard III 91
2. The Governmental Accounting Standards Board (GASB) issued Accounting Standards 43
and 45 for other postemployment benefits (OPEB) in 2004. Prudent fiscal management of
postemployment benefit costs requires the establishment of a long-term plan to prefund these
benefits on an actuarial basis. The plan for postemployment health care benefits is in accor-
dance with various bargaining unit agreements.
The district contributes on a pay-as-you-go basis for postemployment health care benefits,
with additional prefunded contributions determined through mutual agreements between the
district and the collective bargaining units. In accordance with GASB Statement No. 45, the
district reported the following obligation in Note 11 to the audited financial statements for the
year ended June 30, 2012:
Net OPEB obligation, beginning of year $3,114,455
Annual Required Contribution 1,513,980
Interest on net OPEB obligation 155,723
Adjustment to annual required contribution (137,946)
Contributions (706,901)
Net Unfunded OPEB Obligation $3,939,311
According to the latest actuarial report by Total Compensation Systems, Inc., the total pay-
as-you-go plan annual estimates are expected to increase by 13% in 2013-14, 10% in 2014-
15 and 9.1% in 2015-16. Interviews with district administration indicated that plans were
progressing for the district to make an annual contribution into an irrevocable trust to fund
this obligation. The district’s unrestricted general fund preliminary 2013-14 budget shows the
district included a budget assumption for an OPEB trust contribution of $250,000 during the
2013-14 fiscal year. Instead of a lump sum contribution, the district should consider using a
percentage of its salary expense for the contribution to help solidify the concept that the re-
tiree benefit costs are a component of compensation. This concept is closely tied to the defini-
tion of “normal cost” as expressed in the district’s actuarial report.
3. Initial collective bargaining proposals of the district and its bargaining units for 2013-14 were
not reflected in board agendas and minutes during the 2012-13 fiscal year. Collective bargain-
ing agreements do not provide a deadline for either party’s reopening of articles for the fol-
lowing year’s negotiations, and interviews with district staff indicated that negotiations for
the 2012-13 fiscal year have not yet concluded for either its certificated or classified units.
During review of the district’s board agendas and minutes FCMAT noted that two Memoranda
of Understanding (MOU) with the certificated unit were brought to the board as discussion
items at its December 22, 2012 meeting. Further review of the board minutes showed that these
MOUs were not acted upon/approved by the special trustee at subsequent board meetings.
92 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 0
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 5
January 2010 Rating: 6
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard III 93
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 16.1 – Impact of Collective Bargaining
Professional Standard:
The college has developed parameters and guidelines for collective bargaining that ensure that the
collective bargaining agreement is not an impediment to efficiency of college operations. At least
annually, collective bargaining agreements are analyzed by management to identify those charac-
teristics that are impediments to effective delivery of college operations. The college identifies those
issues for consideration by the Governing Board. The Governing Board, in the development of its
guidelines for collective bargaining, considers the impact on college operations of current collective
bargaining language, and proposes amendments to contract language as appropriate to ensure effec-
tive and efficient college delivery. Governing Board parameters are provided in a confidential envi-
ronment, reflective of the obligations of a closed executive board session.
Sources and Documentation:
1. Interview with the CBO
2. Interviews with presidents of the collective bargaining units
3. Collective Bargaining Agreement – CCC Federation of Classified Employees, July 1, 2009
through June 30, 2012
4. Collective Bargaining Agreement – CCC Federation of Employees Certificated Unit, July 1,
2010 through June 30, 2013
5. Quarterly Financial Status Report – Form CCFS – 311Q, June 30, 2012; September 30, 2012;
December 31, 2012
6. Board meeting agendas and minutes
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district has not completed negotiations for 2012-13 reopeners with the certificated bar-
gaining unit. Proposals for this bargaining unit have not been sunshined during the 2012-13
fiscal year; however, it was noted that the district had included two MOUs with its certifi-
cated unit as discussion items at its December 22, 2012 board meeting. Further review of
the board minutes indicated that these MOUs were not acted upon/approved by the special
trustee at subsequent board meetings.
2. At the time of FCMAT’s fieldwork, the district had not completed negotiations with its clas-
sified bargaining unit for the 2012-13 fiscal year, and proposals for the 2013-14 fiscal year
have not been sunshined.
3. The district’s quarterly financial status reports for this review period reflect that the district
had not settled any employee contracts. The Form CCFS – 311Qs require an analysis of the
increased cost to salaries and benefits as well as an explanation of how these items are to
be financed; however, do not expand to reflect the impact upon the entire fund or upon the
ending fund balance. The team found no evidence that multiyear projections were prepared
outside of the Form CCFS – 311Q during the collective bargaining process, and interviews
indicated that the CBO does not sit on the district’s bargaining teams. Although the CBO is
reportedly brought into negotiations when fiscal matters are discussed, oftentimes matters do
94 ACCJC Standard III
not appear to have a direct financial impact, but ultimately they may. The absence of the CBO
during all collective bargaining sessions creates a risk that the financial impact of an agreed
upon decision may not have been considered prior to committing to that decision; thus the
district should include the CBO in all collective bargaining meetings.
Standard Implemented: Fully - Substantially
April 2007 Rating: 8
January 2008 Rating: 8
July 2008 Rating: 8
June 2009 Rating: 8
January 2010 Rating: 8
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard III 95
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.1 – Maintenance and Operations
Fiscal Controls
Professional Standard:
The college has a comprehensive risk management program that monitors the various aspects of risk
management including workers’ compensation, property and liability insurance, and maintains the
financial well-being of the college.
Sources and Documentation:
1. Schools Alliance for Workers’ Compensation Excess II Binder, 2010-11 and 2011-12
2. Independent Audit Report, June 30, 2012
3. Keenan & Associates – 2012-13 Workers’ Compensation Program
4. Compton CCD Employee’s Policy and Procedures Handbook
5. Board Policy 7110, Delegation of Authority, Human Resources, October 20, 2009
6. Keenan & Associates Self-Insured Claims Administration Agreement, July 1, 2012 – June 30,
2015
7. SWACC 2012-13 Program Year Renewal letter
8. SWACC Pro Forma, July 1, 2012 to July 1, 2013
9. SWACC Property & Liability Program Structure, 2012-13
10. SWACC SAWCX II renewal presentation, 2012-13
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district contracts with the Statewide Association of Community Colleges Joint Powers
Authority (SWACC) for the property and liability insurance coverage administered by Keen-
an & Associates.
2. The district is self-insured for the first $500,000 of each workers’ compensation claim, and
participates in the Schools Alliance for Workers’ Compensation Excess II Joint Powers Au-
thority to provide excess workers’ compensation coverage.
Claims liability is based on the cost of claims on file plus an adjustment for estimated future
claims and claims incurred but not reported based on historical experience. The Bay Actu-
arial Consultants’ report provides the basis of liability that is reflected in the annual financial
report.
The projected liability for unpaid losses is reported in the Statement of Net Assets. The dis-
counted value at 3% on June 30, 2012 is $2,009,000 (calculated on the expected confidence
level discounted at 3%), and assets available to pay claims total $2,013,988.
96 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 4
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 8
April 2013 Rating: 9
Implementation Scale:
ACCJC Standard III 97
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.2 – Maintenance and Operations
Fiscal Controls
Professional Standard:
The college has a work order system that tracks all maintenance requests, the worker assigned, dates
of completion, labor time spent and the cost of materials.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interview with the purchasing agent
3. Work order system samples
4. Email regarding SchoolDude training, March 25, 2013
5. Site observations of maintenance assistance line posters
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues its use of the web-based work order tracking system, SchoolDude.
The SchoolDude system is shared with the El Camino CCD as this was deemed to be more
cost effective. The system allows the department to document, access and track maintenance
requests and includes detailed information associated with each request such as description,
location, status, time taken to complete the work, cost of materials associated with the repair,
and budget codes. The system allows users to prioritize work orders, provide a status update,
assign the craftsperson, and enter start/end dates and a full description of the work to be per-
formed. The system is not being utilized to its full potential. It is used to manage basic staff
assignments by trade. The interim director of facilities planning and operations indicated that
the district would benefit from maintaining its own licensed version of the software to maxi-
mize use of the system. Additional modules, not currently available on the El Camino CCD
system, are necessary to achieve this goal.
2. The district has posted signs throughout the campus providing information on how to report
maintenance issues, and the signs include a call line for reporting. Calls from this number
go directly to the interim director of facilities planning and operations who assesses the de-
tails of the request then forwards the information to a staff member in the Maintenance and
Operations Department. The staff member enters the work order in the SchoolDude system
or sends an email with the details of the request to the department supervisors. Greater ef-
ficiency could be attained if the requests were initiated by the requesting party directly in the
SchoolDude system. Because the interim director of facilities planning and operations is rela-
tively new to her position, progress in fully utilizing this system is limited.
3. Just prior to FCMAT’s fieldwork, a memo was sent to select Maintenance and Operations
Department staff, including the utility maintenance supervisors, inquiring about their inter-
est in attending a training on the SchoolDude work order system. No other documentation
indicating that staff have received training on the work order system was provided during this
review period.
98 ACCJC Standard III
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 5
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 99
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.3 – Maintenance and Operations
Fiscal Controls
Professional Standard:
The college controls the use of facilities and charges fees for usage in accordance with college policy.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interviews with utility maintenance supervisors
3. Board Policy 6700, Civic Center and Other Facilities Use, March 17, 2009
4. Administrative Regulation 6701, Civic Center and Other Facilities Use, June 16, 2009
5. Administrative Procedure 6701A, Civic Center Permit and Other Facilities Use, April 16,
2009
6. Form 6701A-1, Compton CCD Facility Use Application, May 11, 2009
7. Form 6701A-5, Compton CCD Facility Reservation Guidelines, April 28, 2009
8. Form 6701A-6, Compton CCD Facility Usage Rules, April 28, 2009
9. Form 6701A-7, Compton CCD Facilities Coordination, April 30, 2009
10. Form 6341B-1, Compton CCD Facilities Order Agreement, March 15, 2010
11. Form 6341C-1, Compton CCD Personal Services Agreement, March 15, 2010
12. Board meeting minutes
13. Sample of executed Civic Center Permits, Form 6701A-2
Progress on Implementing the Recommendations of the Recovery Plan:
1. The district continues the process adopted for facilities usage policy that includes all admin-
istrative rules, regulations and procedures including Education Code Section 82537 regarding
the use of civic centers. Administrative Regulation 6701, Civic Center and Other Facilities
Use, addresses the following:
• Categories of facility use for official district use versus civic center permits
• The guidelines of use under the civic center permit section
• Limitations on use
• Denial of civic center permits
• Identification of type of user
• Direct Charge category
• Fair Rental category
• Rental fees and cost recovery
• Equipment for use in conjunction with facilities rental
• Services such as custodial or security
• Insurance requirements
• Events involving food
100 ACCJC Standard III
• Promotional and advertising materials
• Other requirements
2. Staff reported that they are confident about the process for managing facility use agreements,
and that the orchestration of staff assignments as they relate to executed agreements has im-
proved as the task is now assigned to the Maintenance and Operations Department supervi-
sors. The supervisors assign the work on a rotation schedule to ensure there is a balance in
assigned overtime. There had reportedly been no tracking in the past, but a master calendar
for the year has been established that tracks all events and assignments. FCMAT was not pro-
vided a copy of the master calendar so was unable to verify these reports.
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 4
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 9
Implementation Scale:
ACCJC Standard III 101
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.4 – Maintenance and Operations
Fiscal Controls
Professional Standard:
The Maintenance Department follows standard college purchasing protocols. Open purchase orders
may be used if controlled by limiting the employees authorized to make the purchase and the amount.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interviews with utility maintenance supervisors
3. Interview with the purchasing agent
4. Administrative Regulation 6331, Procurement, February 17, 2009
5. Board Policy 6330, Procurement, February 17, 2009
6. Purchasing Department – Policies and Procedures, revised February 1, 2013
7. Board meeting agendas and minutes
8. Sample of open purchase orders
9. Draft Equipment Purchase Guidelines, February 19, 2013
Progress on Implementing the Recommendations of the Recovery Plan:
1. Procedures for purchase requisitions and purchase orders have been established and imple-
mented by the district as best practices to improve purchasing controls and reduce incidents
of unauthorized purchases. The district does not maintain a warehouse to stock large quanti-
ties of supplies because of space limitations. Rather, the Maintenance and Operations Depart-
ment relies on routine orders as needed from custodial supply vendors. The use of blanket
purchase orders (POs) for restocking supplies makes this process relatively simple. Blanket
POs are created in Datatel annually for routine operational purchasing. They are established
for the entire fiscal year and list the names of staff members who are permitted to place or-
ders and/or authorize payment. The system allows blanket POs to be established and adjusted
as necessary through a purchase order change request. The changes are made by purchasing
staff and documented in Datatel, then forwarded to accounts payable to assist with the pay-
ment process, and the vendor is notified. POs cannot be increased if unencumbered balances
are insufficient within the account line. The budget and related blanket purchase orders were
established for the current review period by the former department manager and have re-
quired little attention by the new interim director of facilities planning and operations.
2. Requisitions are submitted electronically, required authorizations are obtained, and then the
requisition is forwarded to the purchasing technician. The technician reviews the account
numbers on the purchase requisition. Once the requisition is received and reviewed by the
Purchasing Department, a PO number is assigned. The purchasing technician verifies that
the information provided on vendor quotes is reflected correctly on the PO and includes ap-
propriate pricing, tax, shipping, etc., and tries to mitigate any issues that may delay payment
processing by accounts payable. Once complete, the director of fiscal affairs signs all POs.
3. Contracts are placed on the board agenda for approval.
102 ACCJC Standard III
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 4
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard III 103
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 18.5 – Maintenance and Operations
Fiscal Controls
Professional Standard:
Materials and equipment/tools inventory are safeguarded from loss through appropriate physical and
accounting controls.
Sources and Documentation:
1. Interview with the interim director of facilities planning and operations
2. Interviews with utility maintenance supervisors
3. Board Policy 6520, Fixed Asset Security and Accounting, June 16, 2009
4. Administrative Regulation 6520, Security for District Personnel and Property (draft)
5. Draft Administrative Regulation 6535, Use of District Equipment, March 2013
6. Draft Administrative Regulation 6552, Fixed Asset Control System, June 14, 2010
7. Draft Equipment Purchase Guidelines, February 19, 2013
8. Facilities, Maintenance, Operations and Transportation Services Work Environment
Expectations, April 14, 2011
9. Various Maintenance and Operations Department forms and spreadsheets
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Maintenance and Operations Department has experienced some facilities displacement
as a result of the ongoing infrastructure modernization project. The department has struggled
to maintain control of equipment due to the displacement from former secured locations.
Staff reported that materials have been relocated and tractors, mowers and carts have been
parked wherever construction is not taking place, typically in unsecured areas that are vulner-
able to theft. The district should identify temporary secured locations for supplies, tools and
equipment during the displacement period and ensure these district assets are properly safe-
guarded from theft.
2. The Maintenance and Operations Department does not have an adequate inventory system
for tracking small tools and equipment. During FCMAT’s previous review, interviews with
department staff indicated that a tool and equipment inventory had been developed for the
mechanical, electrical and plumbing staff that accounted for all tools and equipment main-
tained in the department. However, documentation provided lacked detail including dates of
creation, acquisition, update or verification. Small tool and equipment inventories should be
sufficiently detailed to account for items purchased by the department and should be updated
as items are lost, damaged or otherwise disposed of. Physical inventories should take place at
least annually, and the documented inventory lists should be updated accordingly and dated.
3. A centralized supply inventory is maintained for custodial cleaning products and supplies,
and Maintenance and Operations Department supervisors are the only staff members with
keys to the storage facility. The interim director of facilities planning and operations indi-
cated that the department continues this process.
104 ACCJC Standard III
4. Compton CCD department administrators are responsible for reporting transfers of property
within and between divisions and in general assume responsibility for the care, custody and
control of all department property. This is clearly stated in draft AR 6552, Fixed Asset Con-
trol System. This administrative regulation has been in draft form since 2009 and does not
accurately reflect the title noted on BP 6520, Fixed Asset Security and Accounting. The title
should be corrected either where referenced in board policy or in the AR. FCMAT was also
provided draft AR 6535, Use of District Equipment. This administrative regulation clearly
describes the responsibilities of each employee related to the custody, use and authority as-
sociated with district equipment under their control. These ARs should be reviewed, finalized
and implemented.
Standard Implemented: Partially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 6
June 2009 Rating: 6
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 4
April 2013 Rating: 4
Implementation Scale:
ACCJC Standard III 105
ACCJC Standard III-D: Financial Resources
FCMAT Financial Management Standard 21.1 – State-Mandated Cost
Professional Standard:
The college has procedures that provide for the appropriate oversight and management of mandated
cost claim reimbursement filing. Appropriate procedures cover: the identification of changes to exist-
ing mandates; training staff regarding the appropriate collection and submission of data to support
the filing of the mandated costs claims; forms, formats, and time lines for reporting mandated cost
information; and review of data and preparation of the actual claims.
Sources and Documentation:
1. Interview with the director of fiscal affairs
2. Interview with the CBO
3. Block Grant Intent Letter to the California Community Colleges Chancellor’s Office
(CCCCO), September 28, 2012
4. Nichols Consulting Contract for Professional Services, November 1, 2011
5. Examples of mandated cost claims and supporting documentation, 2010-11
6. CCCCO 2012-13 Mandate Block Grant Payments Exhibit B-4, revised October 31, 2012
Progress on Implementing the Recommendations of the Recovery Plan:
1. State Government Code Section 17550 et seq. authorizes the district to file mandated cost
claims for reimbursement of certain services mandated by the state. Mandated cost claims are
an opportunity for Compton CCD to recover funds spent on state-mandated activities.
2. For fiscal year 2011-12 the district relied on Nichols Consulting to evaluate eligibility for
new mandated cost claims. In addition to working with Nichols Consulting, the district
should provide annual staff training to review potential areas for reimbursable claims, track
new programs for first-time filing and review procedures for proper tracking.
3. The 2012-13 state budget included funding for the California Community College Mandate
Block Grant. This was a new claiming option, and districts that selected it received $28 per
funded FTES in 2012-13 for the mandates included in the Block Grant. The district opted
into the Mandate Block Grant and received $167,782 for the 2012-13 fiscal year. Districts
must still file annual claims for mandates not included in the Block Grant to receive payment
at some future time, and the state continues to withhold reimbursement for these claims and
prior years’ claims at this time.
4. The district continues to file claims for mandates outside of the Mandate Block Grant and
seek reimbursement for claims that were filed late in previous fiscal years.
The district filed claims for program 232 (collective bargaining), 238 (Brown Act reform),
and 320 (Process I and II) for the 2010-11 fiscal year, which were dated February 25, 2013.
Annual reimbursement claims are due to the State Controller’s Office (SCO) on or before
February 15 following the fiscal year in which costs were incurred. If the annual reimburse-
ment claim is filed after the deadline, but within one year of the deadline, the approved claim
106 ACCJC Standard III
must be reduced by a 10% late penalty. The State Controller’s Office Mandated Cost Manual
for Community Colleges states, “Claims filed more than one year after the deadline will not
be accepted by the SCO.” Based on the date these claim forms were signed, the district is at
least subject to the 10% penalty, totaling $7,447, and may not be entitled to any reimburse-
ment for these claims.
Standard Implemented: Partially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 7
Implementation Scale:
ACCJC Standard III 107
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard IV: Leadership and Governance
A. Decision-Making Roles and Processes – The institution recognizes that ethical and effec-
tive leadership throughout the organization enables the institution to identify institu-
tional values, set and achieve goals, learn, and improve.
1. Institutional leaders create an environment for empowerment, innovation, and institutional
excellence. They encourage staff, faculty, administrators, and students, no matter what their
official titles, to take initiative in improving the practices, programs, and services in which
they are involved. When ideas for improvement have policy or significant institution-wide
implications, systematic participative processes are used to assure effective discussion, plan-
ning, and implementation.
2. The institution establishes and implements a written policy providing for faculty, staff,
administrator, and student participation in decision-making processes.
a. Faculty and administrators have a substantive and clearly defined role in institutional
governance and exercise a substantial voice in institutional policies, planning, and budget
that relate to their areas of responsibility and expertise. Students and staff also have estab-
lished mechanisms or organizations for providing input into institutional decisions.
b. The institution relies on faculty, its academic senate or other appropriate faculty struc-
tures, the curriculum committee, and academic administrators for recommendations about
student learning programs and services.
3. Through established governance structures, processes, and practices, the governing board,
administrators, faculty, staff, and students work together for the good of the institution. These
processes facilitate discussion of ideas and effective communication among the institution’s
constituencies.
4. The institution advocates and demonstrates honesty and integrity in its relationships with
external agencies. It agrees to comply with Accrediting Commission standards, policies, and
guidelines, and Commission requirements for public disclosure, self study and other reports,
team visits, and prior approval of substantive changes. The institution moves expeditiously to
respond to recommendations made by the Commission.
5. The role of leadership and the institution’s governance and decision-making structures and
processes are regularly evaluated to assure their integrity and effectiveness. The institu-
tion widely communicates the results of these evaluations and uses them as the basis for
improvement.
Use of FCMAT Professional and Legal Standards
Since 1998 the Fiscal Crisis and Management Assistance Team (FCMAT) has been involved in
assisting California K-12 school districts under State Administration to return to local governance.
FCMAT developed a standards-based assessment tool as part of this work, and has adapted it for
use in assessing and monitoring the Compton Community College District. FCMAT professional
ACCJC Standard IV 1
and legal standards are being used in conjunction with the Accrediting Commission for Community
and Junior Colleges (ACCJC) standards, as Compton Community College District seeks not only to
return to local governance but also seeks to re-establish its academic accreditation.
For ACCJC Standard IV – Leadership and Governance, appropriate FCMAT standards from the
operational area of Community Relations/Governance have been used to measure progress on
ACCJC Standards IV-A and IV-B. The Accrediting Commission for Community and Junior
Colleges will conduct its own accreditation review to determine when accreditation will be restored
to the Compton Community College District. It is hoped that by addressing the recommendations
made in this report to implement the FCMAT professional and legal standards, the Compton Com-
munity College District will be assisted in readying itself for the ACCJC accreditation review in the
future.
Each professional and legal standard has been provided a score, on a scale of 0 to 10, as to the dis-
trict’s implementation of the standard at this particular point in time. These ratings provide a basis
for measuring the district’s progress over the course of time.
2 ACCJC Standard IV
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard IV: Leadership and
Rating Rating Rating Rating Rating Rating Rating Rating
Governance
A. Decision-Making Roles and Processes
Standard to be Addressed
Communications - Community Relations and Governance
Staff input into college operations is
1.3 1 2 2 4 7 6 7 7
encouraged.
Community Collaboratives, Advisory Committees - Community Relations and Governance
The board and president support
partnerships and collaborations with
3.1 2 2 3 5 8 7 8 8
community groups, local agencies and
businesses.
The board and the president establish
broad-based committees or councils
to advise the college on critical college
issues and operations as appropriate.
The membership of these collaboratives
3.2 3 3 3 4 6 6 7 8
and councils should reflect the
full cultural, ethnic, gender and
socioeconomic diversity of the student
populations – Shared Governance,
Academic Senate, etc.
Community collaboratives and college
Shared Governance, and Academic Senate
3.3 2
have identified specific outcome goals that
are understood by all members.
The college encourages and provides the
necessary training for collaborative and
3.4 council members to understand the basic 3
administrative structure, program processes
and goals of all college partners.
Community collaboratives and college
councils effectively fulfill their
3.5 3
responsibilities and provide a meaningful
role for all participants.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard IV 3
4 ACCJC Standard IV
ACCJC Standard IV-A: Decision-Making Roles and Processes
FCMAT Community Relations/Governance Standard 1.3 – Communications
Professional Standard:
Staff input into college operations is encouraged.
Sources and Documentation:
1. Interviews with faculty leaders (Academic Senate and Union)
2. Interviews with administrators (deans, vice president, CEO)
3. Interview with the special trustee
4. Consultative Council agendas and minutes
5. Board policies and administrative procedures
6. List of Compton Center committees
7. Institutional Effectiveness Committee meeting minutes
8. Attendance at Consultative Council meeting
9. Attendance at Institutional Effectiveness Committee meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton Center has a Consultative Council and two committees, Institutional Effective-
ness and Planning and Budget, under the council. The center also has eight operational cam-
pus committees: Facilities; Health and Safety; Technology; Enrollment Management; Student
Success; Professional Development; Auxiliary Services; and Health Benefits. There are also
four Academic Senate committees. All of the committees are listed on one document that
provides information regarding the composition of members and function of each committee.
Both of the two committees directly under the Consultative Council (Institutional Effective-
ness and Planning and Budget) have, under the leadership of the CEO with assistance from
the special trustee, revised their mission and assumed more direct responsibility for program
review oversight and its correlation with budget and planning. The district should continue
the standing committee structure and ensure that the actions and deliberations of the council
and committees are published and disseminated to help guarantee widespread communica-
tion.
2. The review team attended a Consultative Council meeting on April 15, 2013, at which most
of the council members were present. The district should ensure that each member is respon-
sible for communicating appropriate information back to their constituency.
3. In separate meetings with the special trustee, CEO and vice president of the center, it was
clear that they continue to value and encourage faculty, staff and student input on matters that
affect the Compton Center.
4. Discussions with both administrators and faculty demonstrate that collaborative decisions are
supported and a variety of avenues exist for members of the campus community to provide
input on matters affecting the Compton Center.
ACCJC Standard IV 5
5. As mentioned elsewhere in this report, the CEO sets aside a weekly time for members of the
campus community to meet with him informally on any matter of concern, to share ideas and
ask questions.
6. The review team met with a variety of groups and individuals during fieldwork, including
division chairs, deans, the vice president, faculty leadership, student leaders, student learning
outcomes (SLO) coordinators, and members of the Student Success and Library committees.
Meetings indicated that the leadership of the Compton Center welcomes and encourages
ideas, input and suggestions, and takes them seriously.
7. During prior reviews, there was considerable confusion about the function of the Institutional
Effectiveness Committee. Some committee members thought it was for shared governance
and final budget decisions, and others did not. The function of the committee and its member-
ship was beginning to be clarified during the last review period.
An Institutional Effectiveness Committee meeting that the team attended during this review
confirmed that the center has a well-functioning committee responsible for judging the com-
pleteness and viability of all academic program reviews. Because program reviews directly
tie to the Educational Master Plan, Facilities Master Plan, Staffing Plan and Technology
Master Plan, a working knowledge of these plans is necessary for this committee. Interviews
with committee members support the minutes from Institutional Effectiveness Committee
meetings stating that, although the process is still fairly new, the committee is now working
as it should. The district should regularly evaluate the Institutional Effectiveness Committee
structure to ensure it provides necessary information to the Consultative Council. The district
should, after evaluation of the committee, be able to attest to its sustainability and be able to
adjust it as needed to serve the planning efforts of the Compton Center.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 2
July 2008 Rating: 2
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 7
Implementation Scale:
6 ACCJC Standard IV
ACCJC Standard IV-A: Decision-Making Roles and Processes
FCMAT Community Relations/Governance Standard 3.1 – Community
Collaboratives, Advisory Committees
Professional Standard:
The board and president support partnerships and collaborations with community groups, local agen-
cies and businesses.
Sources and Documentation:
1. Interviews with Board of Trustees members
2. Interviews with faculty, staff, and administration
3. Council and Committee Structure – Compton CCD
4. El Camino College Compton Community Educational Center 2012-13 Enrollment
Management Plan
5. Attendance at Special Trustee’s Advisory Committee meeting
6. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The outreach strategy for the Compton Center has been formalized in the Enrollment Man-
agement Plan, and implementation is under way. The district has supported the implementa-
tion by providing funding and staffing for the activities in the plan. The Enrollment Man-
agement Committee is a committee of the Consultative Council, and develops marketing,
recruitment and retention plans. The enrollment management and marketing plans include
specific outreach strategies to engage local school districts and charter schools and provide
information to middle and high school students within the district’s boundaries. In general,
the goals are specific and include measurable results and the costs associated with them. Al-
though the Enrollment Management Plan continues to have a focus on outreach and recruit-
ment, it has been updated to include a strong emphasis on student retention.
2. The CEO continues to make a priority of developing relationships with local businesses, and
continues to build partnerships with community and civic organizations. The CEO makes a
practice of informing the community of Compton Center activities and goals through meet-
ings with church groups and local councils.
The district should continue its outreach to community groups and the formation of partner-
ships that will serve the district and its students. Board members also should participate in
community outreach with each of their constituencies.
ACCJC Standard IV 7
Standard Implemented: Fully - Substantially
April 2007 Rating: 2
January 2008 Rating: 2
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 8
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
8 ACCJC Standard IV
ACCJC Standard IV-A: Decision-Making Roles and Processes
FCMAT Community Relations/Governance Standard 3.2 – Community
Collaboratives, Advisory Committees
Professional Standard:
The board and the president establish broad-based committees or councils to advise the college on
critical college issues and operations as appropriate. The membership of these collaboratives and
councils should reflect the full cultural, ethnic, gender and socioeconomic diversity of the student
populations: Shared Governance, Academic Senate, etc.
Sources and Documentation:
1. Interviews with faculty, staff, and administration
2. Board policies
3. Council and Committee Structure – Compton CCD
4. Special Trustee’s Advisory Committee agendas and minutes
5. Advisory committees’ meeting minutes
6. Attendance at Special Trustee’s Advisory Committee meeting
7. Attendance at Consultative Council meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee adopted Board Policy 2410 (10/20/09), Board Policies, Administra-
tive Regulations and Procedures, which states that employees and students shall have the op-
portunity to participate in the development of board policies and administrative regulations
through a consultative process. The board/special trustee also adopted Board Policy 2510
(7/20/10), Participation in Local Decision Making. This policy states that, although the board is
the ultimate decision maker, it is committed to ensuring that appropriate members of the district
participate in developing policies and regulations. Additionally, the policy states that the board
will not take any action on matters subject to this policy until the appropriate constituent groups
have been provided the opportunity to participate. Although these policies have been adopted,
they are not fully operational because at present the special trustee is the decision maker.
2. The Consultative Council and its subcommittees are responsible for providing input for deci-
sion-making. During the previous review period, the membership of the Consultative Council
had been reduced to eight: three faculty members, one student, one classified employee, one
manager, the vice president for academic affairs and the CEO who serves as chair. The new
form of the Council has been successful. The members receive reports on and consider such
items as the construction projects, the development of the new memorandum of understand-
ing (MOU) with the El Camino CCD, and the reorganization of Academic Affairs.
3. During the last review period, the Institutional Effectiveness Committee, a committee of the
Consultative Council, was reactivated. Its charge is to focus on the program review to ascertain
that the questions raised are being addressed and to ensure the consistency of documents. The
committee reviews the documents and recommends revisions using a feedback template. The
committee is also responsible for monitoring the recommendations made by FCMAT. The dis-
trict should continue to review the effectiveness of the Institutional Effectiveness Committee.
ACCJC Standard IV 9
4. Advisory committees are required for all technical programs. If properly constituted, they can
provide valuable advice for program changes and development. FCMAT reviewed minutes
from four of the advisory committees. Topics such as job opportunities in the field, industry
expectations, preparation of students, and suggestions made by industry representatives were
discussed. The district should continue the use of advisory committees.
5. During the last review period, the special trustee established the Special Trustee’s Advisory
Committee. The committee consists of 10 members. The role of the committee is to provide
advice to the special trustee regarding policy matters that affect the district and its operations;
promote community awareness of the district’s efforts, focus on quality instruction, educa-
tional mission, fiscal stability, and ultimately accreditation; and foster community support for
the district and the Compton Center.
The review team attended the April 15, 2013 Special Trustee’s Advisory Committee meeting
and observed that the members in attendance were informed, engaged, and took their role as
advisors seriously. The committee exhibited a model of excellent board conduct. The agenda
included such items as the 2013-14 budget assumptions, the goals of the committee for 2013,
the expenditures against the line of credit, and the agreement between El Camino CCD and
Compton CCD. Interviews indicated that members of the committee will be participating in
training activities, including ethics, accreditation, and the Brown Act.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 6
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
10 ACCJC Standard IV
Accrediting Commission for Community and Junior Colleges
(ACCJC) Standard IV: Leadership and Governance
B. Board and Administrative Organizations – In addition to the leadership of individuals
and constituencies, institutions recognize the designated responsibilities of the govern-
ing board for setting policies and of the chief administrator for the effective operation of
the institution. Multi-college districts/systems clearly define the organizational roles of
the district/system and the colleges.
1. The institution has a governing board that is responsible for establishing policies to assure
the quality, integrity, and effectiveness of the student learning programs and services and the
financial stability of the institution. The governing board adheres to a clearly defined policy
for selecting and evaluating the chief administrator for the college or the district/system.
a. The governing board is an independent policy-making body that reflects the public interest
in board activities and decisions. Once the board reaches a decision, it acts as a whole. It
advocates for and defends the institution and protects it from undue influence of pressure.
b. The governing board establishes policies consistent with the mission statement to ensure
the quality, integrity, and improvement of student learning programs and services and the
resources necessary to support them.
c. The governing board has ultimate responsibility for educational quality, legal matters, and
financial integrity.
d. The institution or the governing board publishes the board bylaws and policies specifying
the board’s size, duties, responsibilities, structure, and operating procedures.
e. The governing board acts in a manner consistent with its policies and bylaws. The board
regularly evaluates its policies and practices and revises them as necessary.
f. The governing board has a program for board development and new member orientation.
It has a mechanism for providing for continuity or board membership and staggered terms
of office.
g. The governing board’s self-evaluation processes for assessing board performance are
clearly defined, implemented, and published in its policies or bylaws.
h. The governing board has a code of ethics that includes a clearly defined policy for dealing
with behavior that violates its code.
i. The governing board is informed about and involved in the accreditation process.
j. The governing board has the responsibility for selecting and evaluating the college chief
administrator (most often known as the president). The governing board delegates full
responsibility and authority to him/her to implement and administer board policies without
board interference and holds him/her accountable for the operation of the college.
2. The president has primary responsibility for the quality of the institution he/she leads. He/She
provides effective leadership in planning, organizing, budgeting, selecting and developing
personnel, and assessing institutional effectiveness.
a. The president plans, oversees, and evaluates an administrative structure organized and
staffed to reflect the institution’s purposes, size, and complexity. He/She delegates authority
to administrators and others consistent with their responsibilities, as appropriate.
ACCJC Standard IV 11
b. The president guides institutional improvement of the teaching and learning environment
by the following:
• establishing a collegial process that sets values, goals, and priorities;
• ensuring that evaluation and planning rely on high quality research and analy-
sis on external and internal conditions;
• ensuring that educational planning is integrated with resource planning and
distribution to achieve student learning outcomes; and
• establishing procedures to evaluate overall institutional planning and imple-
mentation efforts.
c. The president assures the implementation of statutes, regulations, and governing board
policies and assures that institutional practices are consistent with institutional mission
and policies.
d. The president effectively controls budget and expenditures.
e. The president works and communicates effectively with the communities served by the
institution.
3. DOES NOT APPLY – it addresses the multi-college district.
12 ACCJC Standard IV
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard IV: Leadership and
Rating Rating Rating Rating Rating Rating Rating Rating
Governance
B. Board and Administrative Organizations
Standard to be Addressed
Community Relations - Community Relations and Governance
Board members refer informal public
2.5 concerns to the appropriate staff for 3 3 3 5 7 6 7 8
attention and response.
Board members are actively involved in
2.9 2
building community relations.
Policy - Community Relations and Governance
The college has established a system of
4.5 securing staff and citizen input in policy 2
development and review.
Board Roles/Boardsmanship - Community Relations and Governance
Board members participate in
orientation sessions, workshops,
conventions and special meetings
sponsored by board associations, and
5.2 have access to pertinent literature, 1 1 3 5 7 6 6 6
statutes, legal counsel and recognized
authorities to understand duties
functions, authority and responsibilities
of members.
The board has established a vision/
mission and uses that vision/mission as
a framework for college action based on
5.3 3 3 3 6 7 7 8 8
the identified needs of the students, staff
and educational community through a
needs assessment process.
The board makes decisions based on the
5.4 study of all available data, including the 3 3 3 4 7 7 3 3
recommendations of the president.
Functional working relations are
5.5 1 1 3 6 7 7 3 3
maintained among board members.
Individual board members respect the
5.6 decisions of the board majority and 1 1 3 6 7 6 3 3
support the board’s actions in public.
The standards in bold text are the identified subset of standards for ongoing reviews.
ACCJC Standard IV 13
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard IV: Leadership and
Rating Rating Rating Rating Rating Rating Rating Rating
Governance
Functional working relations are
5.7 maintained between the board and 1 1 2 6 7 7 3 3
administration.
The board publicly demonstrates respect
5.8 1 1 2 6 7 7 3 3
for and support for the district staff.
The board publicly demonstrates respect
5.9 for public input at meetings and public 1 1 2 6 7 7 5 4
hearings.
Board members respect confidentiality
5.10 of information shared by the 1 1 1 5 7 8 8 8
administration.
Board members do not involve
themselves in operational issues that are
5.11 1 1 1 5 7 7 7 8
the responsibility of the President and
staff.
The board acts for the community and in
5.12 1 1 2 5 7 7 5 5
the interests of all students in the district.
Board Meetings - Community Relations and Governance
An adopted calendar of regular meetings
6.1 exists and is published specifying the time, 3
place and date of each meeting.
The board agenda is made available to
6.2 the public in the manner and under the 4 4 4 6 8 6 5 6
time lines prescribed by law.
Board members prepare for board
meetings by becoming familiar with the
6.3 1 1 2 6 7 7 5 5
agenda and support materials prior to
the meeting.
Board meetings are conducted according to
6.4 1
a set of bylaws adopted by the board.
Open and closed sessions are conducted
6.5 5 5 5 6 7 7 7 8
according to the Ralph M. Brown Act.
Board meetings proceed in a businesslike
6.6 manner while allowing opportunity for 5 5 5 6 7 6 3 3
full discussion.
The standards in bold text are the identified subset of standards for ongoing reviews.
14 ACCJC Standard IV
Accrediting Commission for
April Jan. July June Jan. July June April
Community and Junior Colleges
2007 2008 2008 2009 2010 2010 2012 2013
(ACCJC) Standard IV: Leadership and
Rating Rating Rating Rating Rating Rating Rating Rating
Governance
The Board has adopted bylaws for the
6.7 placement of items on the board agenda by 4
members of the public.
Members of the public have an
opportunity to address the board before
or during the board’s consideration of
6.8 each item of business to be discussed at 4 4 4 7 8 7 7 7
regular or special meetings and to bring
before the board matters that are not on
the agenda.
Board meetings focus on matters related
6.9 1 1 1 3 7 5 5 6
to student educational attainment.
ACCJC Standard IV 15
16 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 2.5 – Community Relations
Professional Standard:
Board members refer informal public concerns to the appropriate staff for attention and response.
Sources and Documentation:
1. Interviews with Board of Trustees members
2. Interviews with faculty, staff, and administration
3. Board policies
4. Board meeting minutes, 2012-13
5. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The team found the members of the Board of Trustees to be aware of their role regarding
informal public concerns. However, it is important for board members to not directly engage
in conversations with members of the public during board meetings but instead direct their
comments to the special trustee and district administration. Furthermore, individual board
members cannot speak for or appear to be speaking for the entire board to the public.
2. An examination of the 2012-13 board meeting minutes did not reveal any instance of an
informal public concern presented to the board. However, in the past, such concerns were re-
ferred to staff.
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard IV 17
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.2 –
Board Roles/Boardsmanship
Professional Standard:
Board members participate in orientation sessions, workshops, conventions and special meetings
sponsored by board associations, and have access to pertinent literature, statutes, legal counsel and
recognized authorities to understand duties, functions, authority and responsibilities of members.
Sources and Documentation:
1. Interviews with administrators
2. Interviews with Board of Trustees members
3. Board policies
4. Board meeting agendas and minutes, 2012-13
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Board of Trustees adopted Board Policy 2740 (12/15/09), Board Education. This policy
states that the board is committed to its ongoing development as a board and to a trustee edu-
cation program that includes new trustee orientation.
2. The district has developed a specific and thorough training agenda for board members. The
training addresses the areas of expectations, roles, and responsibilities for board members
and provides a framework for operations at board meetings. The orientation provides infor-
mation on the Brown Act, and outlines unique situations in the governance of the Compton
CCD, operating the Compton Center in partnership with El Camino CCD.
3. The board members and CEO share the expectation that professional development is critical
to ensure understanding of the most pressing issues affecting community colleges, and that
training to understand the roles and responsibilities of board members is necessary for the
trustees to be fully effective. The board is not engaged in group training at this time; howev-
er, individual members attend conferences. For example, members plan to attend the CCLC
conference.
4. At present, the role of the board is limited because it has no rights, duties or powers, but the
board should continue to develop so it is ready to assume its complete role in the future. The
board should continue its commitment to training and look for training opportunities that will
help members fully understand the appropriate role and conduct of a board member at meet-
ings and when dealing with the public. The members should also recognize that they cannot,
as individuals, speak for or appear to speak for the board unless they are specifically delegat-
ed to do so.
18 ACCJC Standard IV
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 6
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard IV 19
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.3 –
Board Roles/Boardsmanship
Professional Standard:
The board has established a vision/mission and uses that vision/mission as a framework for college
action based on the identified needs of the students, staff and educational community through a
needs assessment process.
Sources and Documentation:
1. Interviews with faculty, staff, and administration
2. Board meeting agendas and minutes
3. Board policies
4. Planning and Budget Committee meeting minutes
5. Attendance at Compton CCD Board of Trustees meeting
6. Attendance at Planning and Budget Committee meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Compton CCD has adopted a vision and mission statement (BP 1200, District Mission
Statement, 10/20/09) that serves as a framework for planning documents across the institu-
tion. This statement was developed with input from faculty and staff, students, administra-
tors, and the Board of Trustees. The document lays out the main themes that should be the
strategic focus of the district for the short- and mid-term and should serve as the basis for
allocating resources. During this review period, the mission statement has not been reviewed.
The CEO and Board of Trustees should periodically revisit this statement to ensure that it
reflects the district’s current needs and priorities for all faculty and students and use the state-
ment to guide planning and budgeting decisions. A regular cycle for its review should be es-
tablished.
2. The Planning and Budget Committee (PBC), a committee of the Consultative Council, has as
part of its charter to “assure that the planning and budgeting are interlinked and that the pro-
cess is driven by the institutional priorities set forth in the Educational Master Plan and other
plans adopted by the District. The PBC ensures that all plans are developed using data from
program review and are linked to the Center’s mission statement and strategic directives.
The PBC makes recommendations with respect to all global Center and District planning and
budgeting issues.” At its meeting of March 26, 2013, the committee specifically discussed the
links between planning, budgeting and the mission statement.
20 ACCJC Standard IV
Standard Implemented: Fully - Substantially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard IV 21
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.4 –
Board Roles/Boardsmanship
Professional Standard:
The board makes decisions based on the study of all available data, including the recommendations
of the President.
Sources and Documentation:
1. Interviews with faculty, staff, and administration
2. Interview with the special trustee
3. Board meeting agendas and minutes, 2012-13
4. Board policies
5. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board Policy 2740, Board Education (12/15/09), states that the Board of Trustees will engage
in study sessions. An examination of board meeting agendas shows that, although study ses-
sions have not been scheduled recently, reports to the board on district matters are scheduled
frequently. During previous interviews with the team, Board of Trustees members cited the
value of study sessions. A member also noted that, although they recognize their role as ad-
visory, they take it seriously and attempt to prepare themselves well. The district should con-
sider providing separate study sessions to the board members regarding detailed topics such
as the budget.
2. The CEO and staff deliver background information and data in advance of public meetings to
ensure the opportunity to review materials and ask questions. As noted above, staff members
routinely provide reports and presentations at board meetings. For example, the board has re-
ceived reports on the status of accreditation, professional development, financial aid, audits,
construction projects and SLOs. Staff should continue to provide reports to the board to help
ensure its effectiveness as an advisory body.
3. The review team attended the April 16, 2013 Board of Trustees meeting. While board mem-
bers at this meeting did not demonstrate the same level of unbefitting behavior that was ex-
hibited during the meeting attended by the team during the last review period, interviews and
review of the 2012-13 board meeting minutes revealed several instances of board members
exhibiting behavior that was inappropriate for a public session. Although agenda items can
at times be extremely sensitive matters to board members, their conduct at meetings should
remain professional.
The Board of Trustees currently has no rights, duties or powers, and thus members may at
times feel frustrated by the board’s advisory role and the fact that they do not sit at the dais
for all meetings. However, it is critical that the members exhibit the decorum and profession-
alism that would demonstrate their readiness to assume a full role when the district regains
local authority to govern areas of operations.
22 ACCJC Standard IV
Standard Implemented: Partially
April 2007 Rating: 3
January 2008 Rating: 3
July 2008 Rating: 3
June 2009 Rating: 4
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 3
Implementation Scale:
ACCJC Standard IV 23
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.5 –
Board Roles/Boardsmanship
Professional Standard:
Functional working relations are maintained among board members.
Sources and Documentation:
1. Interviews with staff, faculty, and administrators
2. Interviews with Board of Trustees members
3. Interview with the special trustee
4. Board meeting agendas and minutes, 2012-13
5. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board members participate in public meetings in an advisory capacity. As of the November
2009 election, the elected board was fully populated. Interviews and review of the board
meeting minutes indicated that the board does not consistently maintain functional working
relationships. The board members need to develop a cooperative working relationship to en-
sure they effectively fulfill their advisory role.
2. The orientation training and professional development agenda for new board members was
designed to develop a cohesive team that understands its role and responsibilities. Both the
local orientation and participation in the statewide conference of community college trustees
should provide the board members with a solid foundation on which to build their functional
working relations with one another.
The review team attended the April 16, 2013 Board of Trustees meeting. While board mem-
bers at this meeting did not demonstrate the same level of unbefitting behavior that was ex-
hibited during the meeting attended by the team during the last review period, interviews and
review of the 2012-13 board meeting minutes revealed several instances of board members
exhibiting behavior that was inappropriate for a public session. To be able to assume the role
and function of a decision-making board, the members will need to be able to deal with all
topics in a cooperative, respectful and professional manner.
3. The board should work to fully understand the appropriate role and conduct of a board mem-
ber both at meetings and when dealing with the public. The members should also recognize
that they cannot, as individuals, speak for or appear to speak for the board unless they are
specifically delegated to do so.
Participation in training and professional development opportunities should be a routine ex-
pectation for board members. It should help to enhance their ability to set the tone and direc-
tion for the district and function cohesively as a board when the district regains local author-
ity to govern areas of operations.
24 ACCJC Standard IV
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 3
Implementation Scale:
ACCJC Standard IV 25
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.6 –
Board Roles/Boardsmanship
Professional Standard:
Individual board members respect the decisions of the board majority and support the board’s actions
in public.
Sources and Documentation:
1. Interviews with staff, faculty, administrators, and community members
2. Interview with the special trustee
3. Board policies
4. Board meeting agendas and minutes, 2012-13
5. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. As of the November 2009 election, the elected board was fully populated. Having a fully
elected board demonstrates that the community wants to be involved and engaged in the
Compton Center and the district. The board members participate in public meetings in an ad-
visory capacity. The board members need to make progress in working together and with the
special trustee to ensure they effectively fulfill this advisory role and in preparation to assume
a decision-making role in the future.
The agenda for orientation, training, and professional development for the board should con-
tinue to enhance their understanding of their roles and responsibilities, improve the board’s
ability to set direction for the district, and heighten their ability to communicate in a profes-
sional and respectful manner, with meeting discussion focused on relevant topics.
2. The board adopted BP 2715, Code of Ethics and Standards of Practice, dated 11/16/2010.
The policy states in part, “Board members recognize that legal and effective functioning is by
the board as a whole. District matters are not governed by individual actions of Board mem-
bers. When acting as Board members, trustees speak and act on behalf of the district, not as
individuals. Board members must use care not to misrepresent their individual opinions or
actions as those of the Board.”
The board needs to develop a coherent, unified voice and a cooperative working relationship.
It must completely understand the recovery plan and be able to articulate it to the public. The
board must also understand and support a critically needed, new MOU that describes the re-
lationship between the Compton Center, Compton CCD, and El Camino CCD.
26 ACCJC Standard IV
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 3
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 3
Implementation Scale:
ACCJC Standard IV 27
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.7 –
Board Roles/Boardsmanship
Professional Standard:
Functional working relations are maintained between the board and administration.
Sources and Documentation:
1. Interviews with administrators
2. Interview with the special trustee
3. Interviews with Board of Trustees members
4. Board policies
5. Board meeting agendas and minutes, 2012-13
6. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The CEO and special trustee continue to meet with and talk to board members to review
operational issues. The elected board is also provided with extensive written material for
each board meeting and for significant operational issues. However, interviews and review
of board meeting minutes indicated that board members do not consistently treat the special
trustee and district administrators respectfully. The board would be required to address sensi-
tive issues frequently if it operated as a decision-making board. Thus it is necessary to main-
tain cooperative, functional relations between the board and administration.
2. The April 17, 2012 board meeting minutes, Item XIX.1.B., state the following:
BP 2715 - Code of Ethics and Standards of Practice
The Special Trustee emphasized that the Board must adhere to the standards
and eligibility requirements, and self-study continually, and requested that they
review and reflect on the Code of Ethics and Standards of Practice and abso-
lutely must adhere to them continually.
During the previous review period, the special trustee indicated that the purpose of the April
17, 2012 agenda item and discussion regarding Board Policy 2715 was to help focus atten-
tion on the importance of the board’s behavior relative to accreditation and respectful rela-
tionships. As noted above, however, interviews and the review of board meeting minutes
revealed lapses in professional behavior on the part of some members.
3. The October 26, 2012 board meeting agenda includes Items V1.1., Ethics Training and VI.2.,
Board Self-Evaluation. However, the minutes were not posted on the district website for re-
view.
28 ACCJC Standard IV
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 3
Implementation Scale:
ACCJC Standard IV 29
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.8 –
Board Roles/Boardsmanship
Professional Standard:
The board publicly demonstrates respect for and support for the district staff.
Sources and Documentation:
1. Interviews with staff, faculty, administrators, and community members
2. Interview with the special trustee
3. Board meeting agendas and minutes, 2012-13
4. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. Interviews indicated that the board does not consistently demonstrate respect for staff mem-
bers and the recommendations made by staff.
2. The April 17, 2012 board meeting minutes, Item XIX.1.B., state the following:
BP 2715 - Code of Ethics and Standards of Practice
The Special Trustee emphasized that the Board must adhere to the standards
and eligibility requirements, and self-study continually, and requested that they
review and reflect on the Code of Ethics and Standards of Practice and abso-
lutely must adhere to them continually.
During the previous review period, the special trustee indicated that the purpose of the April
17, 2012 agenda item and discussion regarding Board Policy 2715 was to help focus atten-
tion on the importance of the board’s behavior relative to accreditation and respectful rela-
tionships. However, as noted previously, interviews and the review of board meeting minutes
revealed lapses in professional behavior on the part of some members.
3. The October 26, 2012 board meeting agenda includes Items V1.1., Ethics Training and VI.2.,
Board Self-Evaluation. However, the minutes were not posted on the district website for review.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 3
April 2013 Rating: 3
30 ACCJC Standard IV
Implementation Scale:
ACCJC Standard IV 31
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.9 –
Board Roles/Boardsmanship
Professional Standard:
The board publicly demonstrates respect for public input at meetings and public hearings.
Sources and Documentation:
1. Interviews with staff, faculty, students, administrators, and community members
2. Interview with the special trustee
3. Board meeting agendas and minutes, 2012-13
4. Newspaper articles regarding the Compton CCD
5. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. With respect to public input, board meetings are usually conducted in a professional and
businesslike manner, with the board serving in an advisory capacity. Professional develop-
ment through conference attendance and in-service training should provide board members
with the understanding of their responsibilities, allowing them to effectively fulfill their roles.
2. Board minutes showed that time for public comments is provided at meetings. However, it
is important for board members to not directly engage in conversations with members of the
public during board meetings but to direct their comments to the special trustee and district
administration. The CEO should continue to ensure that opportunities for input are widely
publicized, and when governing authority is returned, the board should maintain these prac-
tices. A review of recent publications regarding the Compton CCD revealed at least one in-
stance of a board member treating a member of the public disrespectfully at a board meeting.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 4
Implementation Scale:
32 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.10 –
Board Roles/Boardsmanship
Professional Standard:
Board members respect confidentiality of information shared by the administration.
Sources and Documentation:
1. Interviews with staff and administrators
2. Interviews with Board of Trustees members
3. Interview with the special trustee
4. Board meeting agendas and minutes, 2012-13
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board does not participate in closed session discussions, and no concerns have been re-
ported about board members breaching the confidentiality of information presented to them.
The orientation and ongoing training agenda for board members includes information on the
Brown Act and on confidentiality. Board members should continue to receive training in this
area and continue to treat confidential information in an appropriate manner.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 8
June 2012 Rating: 8
April 2013 Rating: 8
Implementation Scale:
ACCJC Standard IV 33
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.11 –
Board Roles/Boardsmanship
Professional Standard:
Board members do not involve themselves in operational issues that are the responsibility of the
President and staff.
Sources and Documentation:
1. Interviews with staff, faculty, and administrators
2. Interviews with Board of Trustees members
3. Board policies
4. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The board/special trustee has adopted several board policies that delegate operational issues
to the appropriate staff. BP 2200, Board Duties and Responsibilities (1/19/10), delegates
power and authority to the CEO to effectively lead the district and indicates that the board
will respect the authority of the CEO by providing policy, direction, and guidance only to
the CEO, who is responsible for the management of the district and its employees. BP 2430,
Delegation of Authority to the CEO (11/17/09), delegates executive responsibility to the
CEO for administering policies adopted by the board and executing all decisions of the board
requiring administrative action. BP 6100, Delegation of Authority (2/17/09), specifically del-
egates authority to the CEO to supervise the general business and fiscal affairs of the district.
BP 7110, Delegation of Authority, Human Resources (10/20/09), delegates to the CEO the
authority to employ personnel, fix job responsibilities and perform other personnel actions
subject to ratification by the board.
With these adoptions, the board has in place the framework for meeting this standard as well
as the related accreditation standards.
The team received no reports of board members being inappropriately involved in routine staff
matters, and the board members indicated they were routing any operational concerns to appro-
priate district personnel. This was confirmed by staff. The board should continue this practice.
Standard Implemented: Fully - Substantially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
34 ACCJC Standard IV
Implementation Scale:
ACCJC Standard IV 35
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 5.12 –
Board Roles/Boardsmanship
Professional Standard:
The board acts for the community and in the interest of all students in the district.
Sources and Documentation:
1. Interviews with staff, faculty, administrators, and community members
2. Board policies
3. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The Board of Trustees/special trustee adopted BP 2200, Board Duties and Responsibilities,
dated January 19, 2010, which states in part that the board is committed to fulfilling its re-
sponsibilities to represent the public interest.
As noted previously, some board meetings have not been conducted in a completely profes-
sional and businesslike manner. In representing the public interest, the board must speak
with a coherent, unified voice. It is in the best interest of the community and students for the
board to completely understand the recovery plan and be able to articulate it to the public.
The board must also understand and support a revised MOU that describes the relationship
between the Compton Center, Compton CCD, and El Camino CCD.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 5
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
36 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.2 – Board Meetings
Legal Standard:
The board agenda is made available to the public in the manner and under the time lines prescribed
by law. (Government Code 54954.1, 54954.2)
Sources and Documentation:
1. Interview with the special trustee
2. Interview with the CEO
3. Board meeting agendas, May 2012 through April 2013
4. Board policies 2340 and 2360
5. Compton CCD website (www.district.compton.edu)
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board agendas are posted 72 hours prior to the regular board meeting in a prominent place
next to the Administration Building in compliance with the Government Code and Compton
CCD board policy. Minutes from the previous regular meeting are also posted for public re-
view.
2. In a review of the district website, the team found that the 2012-13 board meeting agen-
das and minutes, except for the October 26, 2012 meeting minutes, are posted. The district
should continue to ensure that agendas for all board meetings are posted in compliance with
Government Code.
3. A schedule of 2012-13 board meeting dates appears on the Board of Trustees page of the dis-
trict website, which allows interested members of the public and Compton CCD employees
to plan their schedules should they wish to attend.
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 6
January 2010 Rating: 8
July 2010 Rating: 6
June 2012 Rating: 5
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard IV 37
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.3 – Board Meetings
Professional Standard:
Board members prepare for board meetings by becoming familiar with the agenda and support mate-
rials prior to the meeting.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the special trustee
3. Interview with Board of Trustees member
4. Attendance at Compton CCD Board of Trustees meeting
5. Attendance at Special Trustee’s Advisory Committee meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. The review team attended the regularly scheduled Board of Trustees meeting on April 16,
2013. The meeting was appropriately noticed and held to conduct regular business. The team
also attended the regularly scheduled meeting of the Special Trustee’s Advisory Committee
meeting on April 15, 2013. At both meetings it was clear that the elected board and the advi-
sory committee were prepared for the meetings.
2. The special trustee and the CEO indicated that the board is working hard to understand the is-
sues and to work together as a board and not as five individuals. Because the board is limited
to serving in an advisory capacity since a special trustee has been appointed and the educa-
tional and student service programs fall under the purview of the El Camino CCD board, they
must limit the areas that they discuss and concern themselves with as a board. The elected
board is engaged by the special trustee through the process of asking their opinion on items
but does not have voting authority. The board members do seem to prepare for meetings, are
informed and provide feedback when asked.
3. With the appointment of the new special trustee in fall 2011, the elected board has gone
through some changes regarding board meeting participation. They do not sit at the dais dur-
ing all board meetings and do not attend closed session meetings.
4. The special trustee and the CEO are providing board training for the elected board. One of
the trainings is focused on ethics and is scheduled for June 2013.
5. During the last review period, the special trustee sought applications from the community to
serve on the Special Trustee’s Advisory Committee and provide advice. The stated purpose of
the committee, as outlined in Assembly Bill 318, is as follows, “The CCCD Special Trustee’s
Advisory Committee is organized to advise the Special Trustee with respect to the manage-
ment of the Compton Community College District.” The Special Trustee’s Advisory Commit-
tee now has a full complement of 10 members.
38 ACCJC Standard IV
The review team attended the committee meeting on April 15, 2013 and found it to be well-
run and productive. Members were prepared on the agenda issues, and they asked pertinent
questions. There seemed to be a clear sense of commitment to the district among the com-
mittee members. Members have varying backgrounds and represent different communities
within the Compton CCD’s service area. They were made aware of several training opportu-
nities and requested that they be provided the training as soon as possible. The district is also
providing board training in the community for potential future board members.
The agenda of the Special Trustee’s Advisory Committee included several of the same items
that the Board of Trustees will discuss, reports from the interim director of facilities and the
CEO, and budget information. Members of the campus community and the public were also
present at the meeting.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 2
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 5
April 2013 Rating: 5
Implementation Scale:
ACCJC Standard IV 39
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.5 – Board Meetings
Legal Standard:
Open and closed sessions are conducted according to the Ralph M. Brown Act. (Government Code
54950 et seq.)
Sources and Documentation:
1. Interview with the special trustee
2. Interview with the CEO
3. Board policies 2200, 2300, and 2310
4. Board meeting agendas and minutes
5. Attendance at Compton CCD Board of Trustees meeting (open session only)
Progress on Implementing the Recommendations of the Recovery Plan:
1. Closed session is held immediately after opening the board meeting. Open session occurs
afterward and a report of any action taken in closed session is provided. The elected board
members do not attend closed session at this time.
2. Evidence presented indicated that board meetings adhere to the Brown Act.
Standard Implemented: Fully - Substantially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 8
Implementation Scale:
40 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.6 – Board Meetings
Professional Standard:
Board meetings proceed in a businesslike manner while allowing opportunity for full discussion.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the special trustee
3. Board meeting agendas and minutes, May 2012 through April 2013
4. Board policies
5. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. At the April 16, 2013 board meeting, the board generally conducted itself appropriately.
However, the overall atmosphere at the board meeting was conflicted. For example, it was
apparent from comments made by some of the board members that they are unhappy with not
being allowed to function more as an elected board, and they take the opportunity to express
this at public meetings. In a few instances, the special trustee and CEO were not treated re-
spectfully. Behaviors such as these do not create an atmosphere where people in the audience
might want to share their views on an issue. All members of the Board of Trustees should
take the opportunity to work with the special trustee to understand the standard of collabora-
tion that will be needed for the district to regain local governance.
2. Interviews indicated that the board members were to have completed a self-evaluation during
this review period; however, only three of the members have completed the evaluation. At
the time of FCMAT’s fieldwork, the CEO and special trustee were planning to develop goals
and evaluation questions for the board and ask them to complete these in June. The CEO will
then complete a six-month evaluation of the goals in December at the board’s organizational
meeting. This will put them on the correct cycle for board evaluation as required by the
ACCJC. The district should adhere to this timetable.
3. The board meetings attended by the review team during the current and past several review
periods have provided the opportunity for people to speak, as indicated in BP 2370, Rep-
resentatives at Board Meetings. Representatives from several organizations including the
Academic Senate, the certificated union, the classified union, a classified staff representa-
tive, a faculty representative, and the Associated Student Body all have a place on the agenda
for reports. This is part of the communication process between the Compton Center and the
elected board, and the items were included on the April 16, 2013 board meeting agenda.
ACCJC Standard IV 41
Standard Implemented: Partially
April 2007 Rating: 5
January 2008 Rating: 5
July 2008 Rating: 5
June 2009 Rating: 6
January 2010 Rating: 7
July 2010 Rating: 6
June 2012 Rating: 3
April 2013 Rating: 3
Implementation Scale:
42 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.8 – Board Meetings
Legal Standard:
Members of the public have an opportunity to address the board before or during the board’s consid-
eration of each item of business to be discussed at regular or special meetings, and to bring before
the board matters that are not on the agenda (Education Code 35145.5).
Sources and Documentation:
1. Board meeting agendas and minutes, May 2012 through April 2013
2. Board Policy 2350
3. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. Board Policy 2350, Public Participation, outlines the three ways in which a member of the
public may address the board. A member of the public may submit a request to address the
board on a non-agenda item by presenting that request in writing within the first 10 minutes
of the meeting. A request may be submitted to the CEO 18 days prior to a board meeting re-
questing that an item be placed on the agenda. A member of the public may submit a written
communication to the board regarding an agenda item or request to speak on the item at the
meeting; written communications regarding agenda items are to be received at least 24 hours
prior to the meeting.
2. Board agendas and minutes indicate that the public is provided an opportunity to address the
board at meetings. In addition, the review team’s observation of the April 16, 2013 meeting
indicated that members of the public are given three minutes during the public comments
portion of the meeting to address the board if they have submitted a written request; several
individuals did so at this meeting. Members of the public also are allowed to address the
board as items are presented throughout the meeting. Board members should continue to be
provided training opportunities to ensure effective boardsmanship and the boundaries for ap-
propriately responding to the public.
Standard Implemented: Partially
April 2007 Rating: 4
January 2008 Rating: 4
July 2008 Rating: 4
June 2009 Rating: 7
January 2010 Rating: 8
July 2010 Rating: 7
June 2012 Rating: 7
April 2013 Rating: 7
ACCJC Standard IV 43
Implementation Scale:
44 ACCJC Standard IV
ACCJC Standard IV-B: Board and Administrative Organizations
FCMAT Community Relations/Governance Standard 6.9 – Board Meetings
Professional Standard:
Board meetings focus on matters related to student educational attainment.
Sources and Documentation:
1. Interview with the CEO
2. Interview with the special trustee
3. Board meeting agendas and minutes, May 2012 through April 2013
4. Attendance at Compton CCD Board of Trustees meeting
Progress on Implementing the Recommendations of the Recovery Plan:
1. A review of board agendas and minutes reveal that each senior manager has time on the
agenda to discuss issues/accomplishments in their areas. The vice president of the Compton
Center reports on academic affairs, and presents items relating to student educational at-
tainment. The district should consider noting in the minutes significant items reported in the
senior management reports as they relate to student educational matters so that center staff
and the public reading the minutes might benefit from the information about Compton Center
student successes.
2. The CEO reports at each board meeting on items of interest at the Compton Center and to the
district, some of which touch on student educational attainment.
3. The CEO invites appropriate managers to discuss progress in some of their areas as it affects
student success at board meetings. A report from the research office on the ARCC data, a re-
port from the interim director of facilities on the progress of the library and others were pre-
sented.
Standard Implemented: Partially
April 2007 Rating: 1
January 2008 Rating: 1
July 2008 Rating: 1
June 2009 Rating: 3
January 2010 Rating: 7
July 2010 Rating: 5
June 2012 Rating: 5
April 2013 Rating: 6
Implementation Scale:
ACCJC Standard IV 45