FCMAT
Comprehensive Review Pupil Achievement
Read the report at Compton Unified School District ↗
Compton Unified
School District
Pupil Achievement
Comprehensive Review
February 2003
Administrative Agent
Larry E. Reider
Office of Kern County
Superintendent of Schools
Chief Executive Officer
Thomas E. Henry
Pupil Achievement Standards
The following standards were identified as needing to reach a rating of 8 to be deemed compli-
ant. If not already presented in response to a Section of the Consent Decree, these standards ap-
pear in the following pages. A chart of the Pupil Achievement standards is included to provide an
overview of the ratings of the standards over time and the status of their implementation.
1.2 See Consent Decree Section 13
1.4
1.5 See Consent Decree Section 19
1.10 See Consent Decree Section 24
1.11 See Consent Decree Section 13
1.16 See Consent Decree Section 19
1.20
1.21
1.23
1.25 See Consent Decree Section 8
2.3
2.6
2.9
2.10
Pupil Achievement 1
2 Pupil Achievement Pupil Achievement 3
1.4 Multiple Assessment Tools – Program Adjustment
Professional Standard
The district has adopted multiple assessment tools, including diagnostic assessments, to evaluate,
improve, or adjust programs and resources.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
1. The district utilizes multiple diagnostic assessments to measure students’ academic
performance. The Assessment Plan 2002-2003, to coordinate all tests and assessments
in the district, has been updated. The Assessment Plan has been developed, presented,
and disseminated to all principals and site testing coordinators.
2. A new Senior Director has been hired to lead the Office of Research, Evaluation, and
Assessment. The office’s budget has been utilized for assessment and/or services to
assist the school sites to better evaluate their students.
3. Many of the assessments utilized in the district are state required tests, such as the
SAT-9 for grades 2-11, the CAHSEE which is administered at grade 10, and the
CELDT which is utilized in the English language learner programs. However, other
assessments are used for diagnostic and student placement purposes. Math and Al-
gebra test scores are used to place students in appropriate math classes at the middle
and high school level. Language! test scores are used to place students in the appro-
priate support classes at the elementary, middle and high school levels. The Degrees
of Reading Power assessment is administered twice a year in grades 4-8 as a pre and
post- reading test. The AIMSweb is administered three times a year in grades 1-3 to
monitor reading improvement. CELDT test scores are used to identify students to be
re-designated.
4. State mandated test results (CAHSEE, Physical Fitness Test, SAT-9 and California
Standards test results, SABE/2) are disseminated to all stakeholders within 2 days
after being received by the district. Schools have received assessment results for all
district and state assessments for use in developing their individual school plan for
student achievement. All schools submitted a site testing plan for administering the
STAR and CAHSEE during the month of February. Schools can also request custom-
ized test data reports.
5. The CAHSEE has been administered at least three times to all 11th graders. The
district reported that 15% of 11th graders passed the math portion and 29% passed the
language arts portion of the test. CAHSEE will be administered to all 10th graders in
March of 2003. Many students have failed to pass both the math and language arts
portions of the exam. The district is developing a remediation plan for students who
2 Pupil Achievement Pupil Achievement 3
have not passed one or both portions of the CAHSEE exams. Middle school and high
school administrators and teachers continue to participate in CAHSEE trainings pro-
vided by UC Irvine, the Pulliam Group, Kaplan, Target Teach, and Riverdeep Math.
6. Test results are disaggregated, summarized and presented to Executive Cabinet and
principals. Additional discussions on test results are held at divisional meetings. Infor-
mation is shared at different settings with parents and the school communities.
7. Assessments are also imbedded in adopted curriculum materials such as Open Court,
Language! and Saxon Math, providing teachers with immediate feedback on students’
performance. Benchmark tests have also been made available to all high schools in the
core subject areas.
8. District writing assessments are administered 4 times a year. Teachers score writing
assessments using a 4-point rubric that is aligned with the state standards and CAH-
SEE.
9. The K-5 standards based report card continues to be implemented. The 6-12 report
card is generated using SASI software and mailed home to all parents within two
weeks of the grading period. A standard-based report card for grades 6-12 will be
developed in 2002-03.
10. School Academic Performance Index (API) scores are increasing, although there are
several schools that continue to have difficulty meeting their performance growth
targets. Most district schools participated in a school improvement program such as
the CSRD, II/USP, or Program Improvement program. Twenty-four schools currently
receive the High Priority School Program grants to focus on improvement in stu-
dent achievement. Four additional schools have been invited to apply. Some district
schools may face possible state sanctions in the future for failing to meet performance
growth targets. All schools will be subject to meeting the standards of the No Child
Left Behind federal legislation.
Districts have been informed that the API scores will be determined differently in the
future. API scores have previously been determined primarily using the norm-refer-
enced test, the SAT-9. It is expected that in this 2002-2003 school year, the API scores
will be determined with the STAR content standard tests making up 73% of the API,
the CAT-6 making up 12% and the high school exit exam (CAHSEE) making up 15%
of the high school API score. At the elementary level, the norm-referenced test CAT-
6 will make up only 20% of the API score, with the other 80% being made up of the
content standard tests.
11. The district is considering changing their student information system, from SASI to
another software which is CSIS compliant, to be implemented in the 2003-04 school
year. As the district was not successful with an attempted conversion to the SIMS
software three years ago, the district is planning to implement both systems on a paral-
lel basis for several months before committing to the complete conversion to the new
system. A new registration form implemented in fall of 2001 continues to be used to
collect pertinent data required for all students.
4 Pupil Achievement Pupil Achievement 5
Standard Implemented: Fully Implemented – Substantial
February 1999 Rating: 0
August 1999 Rating: 2
February 2000 Rating: 4
August 2000 Rating: 6
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 6
August 2002 Rating: 7
February 2003 Self Rating: 8
February 2003 New Rating: 8
Implementation Scale:
Not Fully
4 Pupil Achievement Pupil Achievement 5
0 1 2 3 4 5 6 7 8 9 10
1.20 Administrative Support and Coaching – Teachers
Professional Standard
Administrative support and coaching are provided to all teachers.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
1. As reported in earlier progress reports, coaching of teachers is provided by site ad-
ministrators, curriculum specialists, UC subject matter consultants, and outside con-
sultants. Principals have been trained in coaching strategies. Coaching and classroom
support is expected to be consistent and frequent, especially for newly hired teachers
and those with emergency credentials. All new district programs implemented in-
clude coaching of teachers as a major strategy to be provided by all service providers,
including the California Professional Development Initiative providers: UC Irvine,
CSU Long Beach, CSU Dominguez Hills, and LACOE California School Leadership
Academy.
2. The certificated evaluation form has been revised to include the California Standards
for the Teaching Profession as desired teaching outcomes. Principals are familiar
with the standards and are expected to observe classrooms and establish goals with
teachers with these standards in mind. All administrators are trained on the California
Standards for the Teaching Profession. Principals are still required to be in the class-
rooms or engaged in instructional activities for 40% of the day to address instructional
improvement. Principals are receiving additional training so that they can support the
teacher’s subject matter expertise rather than only lesson formats.
3. Principals themselves are being evaluated by the superintendent, with input from the
division associate superintendents. The principal’s evaluation process involves a pre-
and post-conference, and includes curriculum oversight and time in the classroom.
The district reports that principals this year are demonstrating strong leadership skills.
4. Key Results visitations are being conducted at the elementary schools. These are inter-
nal reviews by district administrative teams of the school site and classrooms. Find-
ings and recommendations are shared with the principal before the review team leaves
the school.
5. Principals at HPSP, II/USP and CSRD schools continue to work with school site
councils and parent associations to implement steps and site level plans to remove bar-
riers to learning for all students. The external evaluators of HPSP, II/USP and CSRD
schools also serve as classroom and administrator mentors and coaches.
6 Pupil Achievement Pupil Achievement 7
6. Division associate superintendents meet with site administrators at least once a month,
and visit schools frequently. Administrators review and discuss their current opera-
tional practices and determine areas for improvement. High school assistant principals
and student support coordinators participate in an annual instructional institute coor-
dinated by district staff. A Middle School Symposium was held in October 2002 to
provide an opportunity for the middle school site leadership teams to share their best
practices.
7. School schedules were modified during the school year to include “banked time” for
staff development. Late entry Mondays and adjusted Mondays provided a block pe-
riod of time for staff development and instructional support. The Office of Research,
Evaluation, and Assessment continues to assist the district and school sites by provid-
ing relevant student information to assist in staff and project development.
Standard Implemented: Fully Implemented – Substantial
February 1999 Rating: 0
August 1999 Rating: 3
February 2000 Rating: 4
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 7
February 2003 Self Rating: 8
February 2003 New Rating: 8
Implementation Scale:
Not Fully
6 Pupil Achievement Pupil Achievement 7
0 1 2 3 4 5 6 7 8 9 10
1.21 Professional Development – Personnel Evaluation
Professional Standard
Professional development is linked to personnel evaluation.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
1. The certificated evaluation form has been revised and is now is aligned with the Cali-
fornia Standards for the Teaching Profession. The six standards are:
1. Engaging and supporting all students in learning.
2. Creating and maintaining effective environments for student learning.
3. Understanding and organizing subject matter for student learning.
4. Planning instruction and designing learning experiences for all students.
5. Assessing student learning.
6. Developing as a professional educator related duties and responsibilities.
Standard six indicates a direct relationship between staff development and
personnel evaluation.
2. Principals have been trained to use the revised evaluation form and to base classroom
observations on these standards. This is the first year the district is utilizing the newly
revised teacher evaluation form.
3. The district’s Peer Assistance and Review Program (PAR) provides a link between
professional development and individual teacher performance. The PAR program
provides a plan of assistance to teachers who are performing at a less than satisfactory
level, and provides coaching support to probationary teachers. The district has as-
signed three teachers as full-time consultants to support teachers who need assistance.
4. Principals are still expected to spend forty percent of their day in the classroom or
in related instructional activities. Principals visit classrooms to ensure that skills and
knowledge learned in staff development training are being used to increase student
achievement. Principals’ evaluations include their effectiveness in supervising faculty
and staff, and monitoring curriculum, and includes significant documentation.
5. The Superintendent evaluates principals with input from the associate superintendent
of each division. The division associate superintendents work with principals to ensure
that they monitor the delivery of instruction in the classroom. The principals’ evalua-
tion form is being revised by the superintendent.
6. The Office of Research, Evaluation, and Assessment continues to share test data with
the site testing coordinators upon the receipt of the test data from the state. At the be-
ginning of each school year, principals share student test data with the faculty and site
leadership teams.
8 Pupil Achievement Pupil Achievement 9
7. The numerous staff development efforts undertaken by the district, and described
elsewhere in this report, are provided to improve the skills and performance of the
instructional staff, and therefore the achievement and performance of the district’s
students. Teachers needing assistance can receive appropriate staff development train-
ing. Approximately 47% of the teaching staff is fully credentialed. A large percentage
of teaching staff are still either emergency permit holders or pre-interns. The district
continues to work with these teachers on credential requirements to increase the per-
centage of fully credentialed teachers in the district.
Standard Implemented: Fully Implemented – Substantial
February 1999 Rating: 0
August 1999 Rating: 3
February 2000 Rating: 4
August 2000 Rating: 5
February 2001 Rating: 5
August 2001 Rating: 5
February 2002 Rating: 7
August 2002 Rating: 7
February 2003 Self Rating: 8
February 2003 New Rating: 8
Implementation Scale:
Not Fully
8 Pupil Achievement Pupil Achievement 9
0 1 2 3 4 5 6 7 8 9 10
1.23 Initial Student Placement – Procedures
Professional Standard
Initial placement procedures are in place to ensure the timely and appropriate placement of all
students with particular emphases being placed on students with special needs.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
Special Education:
1. A New Student Orientation Center was established on September 3, 2002 at 417 West
Alondra Avenue to receive all students new to the district for enrollment, assessment
and appropriate placement of all students. Initial Student Placement Procedures and
a Tracking Form have been developed to ensure that students new to the district are
properly assessed at the New Student Orientation Center for appropriate placement at
a district school site. Training has been provided to site administrators on the process
and procedures of initial placement. The Center provides support services for Special
Education, English Language Learners, Child Welfare and Attendance, Health, Human
and Homeless Services, and some Alternative Education services such as a district
suspension classroom. A Kindergarten “round-up” is planned to begin in March, to
notify parents in the community to begin the registration process early in the spring to
prepare for school placement in the fall.
2. Site administrators continue to assist the student placement process by making sure
that master schedules in the middle and high schools provide appropriate course of-
ferings for English learners and special needs students. Increasing staff awareness of
special needs students and procedures for providing services remains a district prior-
ity. Training is also being provided to Student Study Teams (SSTs) at the sites as they
consider new applicants for special education services.
3. The Special Education Handbook of Policies and Procedures has been again revised.
Special Education compliance protocols and procedures have been developed for
monitoring of special education services. The protocols summarize the administrative
responsibilities of site administrators in the SST, IEP, and 504 processes.
4. The Office of Special Education has been reorganized to better serve special needs
students. District Special Education administrators are located at the New Student
Orientation Center. The school psychologists have work stations at the New Student
Orientation Center and are assigned to specific school sites to provide services to the
students at their assigned sites.
10 Pupil Achievement Pupil Achievement 11
5. The Special Education administration has developed a Proposed Action Plan to sat-
isfy corrective actions, both individual and systemic, in response to non-compliance
issues. The plan identifies the responsible parties to address the corrective action to be
taken. The plan is in draft form but implementation has begun.
6. The district has developed a Voluntary Resolution Plan in response to OCR concerns
to ensure that it has sufficient numbers of psychologists, program specialists, resource
specialists and special education and regular education teachers who are qualified
to identify and address the special education and linguistic needs of English learner
students. The Office of Human Resources and Employee Development (HRED) is
implementing and monitoring the plan.
7. A district staff roster has been developed to show teaching positions filled as a result
of recruiting. This information helps ensure that properly credentialed and certificated
teachers are working with English learners and special education students.
8. Staff Development is being provided continuously for teachers, para-educators, and
administrators on services to special education, general education, and English lan-
guage learner students. Announcements and information are sent to the school sites in
the form of memorandums and flyers.
9. Intervention programs and regular education alternatives have been established as
academic safety nets for students who do not qualify for special education services. At
the elementary level, an alternative school is available at Caldwell Elementary. Accel-
erated Learning Programs (ALPs) are available for students who are being retained at
grade level. Intervention programs include after school tutorials, additional class peri-
ods or an extension of the student’s day, and mandatory summer school attendance.
10. The district’s technology department provides data reports on the status of student
IEP’s, Triennials, and Student Suspensions to support regular monitoring. The dis-
trict is able to monitor, by site, any overdue triennial or IEP on a monthly basis to
take timely action. As reported in earlier six-month progress reports, the district had
cleared its backlog of overdue IEPs and Triennials and attempts to remain current with
timelines. However, a review of the most recent district data indicates that a signifi-
cant number of IEPs and Triennials are again overdue. The district must address the
timeliness of these requirements and make this a major priority. These numbers will
be reviewed again at the review team’s next visit during the summer months.
11. A referral tracking system for special needs health assessments continues to be moni-
tored. An updated student list is provided to nurses by early October for students need-
ing triennial assessments.
12. The curriculum for special education is enhanced by 270 lessons in the Language!
Program for use with ELD and special education students in grades 6-12. A workabil-
ity program resource center has been established at Willowbrook Middle School. The
center is designed to meet the instructional and career education needs of students in
middle school special education classes.
10 Pupil Achievement Pupil Achievement 11
English Language Learners:
1. The Master Plan for English Learners has been completed and is being implemented.
All site administers will receive training on the Master Plan during the month of Feb-
ruary. The Master Plan was adopted by the governing board on December 10, 2002,
and has been approved by the state department.
2. The district was visited by the Comité during the fall semester 2002, and has worked
strenuously to address the many areas of non-compliance in the English language
learner program cited by the Comité. The district has addressed most of the areas of
non-compliance, and has until June 2003 to address any remaining areas.
3. The district was required to establish a process to track the credential and training
status of teachers working with English learners. The Office of Human Resources and
Employee Development (HRED) maintains an extensive database on employees and
tracks the credential status of all teachers; sends reminders to staff when credentials
need to be renewed; requires emergency permit holders to become Pre-Interns work-
ing toward meeting credential requirements; and monitors the progress of the Pre-
Interns. HRED monitors the credentials of staff who work with English learners to
ensure that qualified teachers have been assigned to deliver ELD and core curriculum
to English learners.
4. Seven additional language assessors were hired in the fall 2002 to assist in the read-
ing, math, and writing assessments of all students who register at the New Student
Orientation Center. The Center now employs eleven language assessors. The wait time
for students has been greatly reduced. Students are generally placed at a school site
within two days of initial intake at the Center.
5. Initial placement procedures have been established for English language learners and
special education students at the New Student Orientation Center. Two certificated
personnel, a counselor and a staff teacher, were hired to explain and provide program
options to parents. After discussing with parents the students’ assessment results these
personnel assign students to their respective attendance area schools. Both the coun-
selor and the staff teacher have been trained to immediately involve the Special Edu-
cation Department (also located at the New Student Orientation Center) when working
with special needs students to facilitate a timely and appropriate program and program
placement.
6. Appropriate assessments are conducted based on the Home Language Survey. Proce-
dures for monitoring student progress have been established to ensure proper place-
ment of these special needs students.
7. All language assessors are trained to conduct CELDT tests. Site CELDT test adminis-
trators were provided with training and regular updates. The LAS II-Spanish version
is used to assess Spanish-bilingual students’ primary language proficiency level. The
CELDT is scored by the language assessors at the New Student Orientation Center to
generate a preliminary assessment of students’ English Language proficiency level to
insure timely placement of students.
12 Pupil Achievement Pupil Achievement 13
8. As reported in earlier six-month progress reports, Board Policy No. 6174 Education
for English Language Learners was revised.
9. The district has long struggled to meet compliance in its English Language Learn-
ers program. As reported in the previous six-month progress report, the district had
its EIA funds impounded and released in allotments upon completion of the OCR
requirements. The district developed its Accountability Plan for English Language
Learners and developed a manual of procedures and forms titled “Registration to
Redesignation” to serve English language learners. The district developed ELL dis-
trict benchmarks, and ELL checklists for both elementary and secondary principals
to monitor the ELL programs at their sites. The district has recently completed the
Master Plan for English Learners, and expects the release of the impounded funds.
10. The district has developed new program descriptions for program placement. The
district provides Structured English Immersion classes and two Spanish immersion
programs at Emerson and Tibby Elementary Schools. Course descriptions have been
written for Specially Designed Academic Instruction in English (SDAIE) for all cours-
es required for graduation. English language development (ELD) course descriptions
have been written for English language development classes. An ELD Curriculum
Guide has been developed and disseminated to teachers. High Point and Into English
are used in grades 4-12 as the textbooks in ELD classrooms. Additional support mate-
rials have been purchased for all levels. Grades K-5 have available: Hampton-Browne,
Into English, SRA, and Open Court; Grades 6-12 have available: Heinle-Heinle,
Voices in Literature, Glencoe, and Language!
11. The district continues to implement a Voluntary Resolution Plan (VRP) to address
issues raised by the Office for Civil Rights. The district hired a Compliance Officer to
respond to complaints or issues. As reported in the fourth six-month progress report,
the district contracted with WestEd for technical assistance in meeting the require-
ments of the VRP. WestEd, in its January 15, 2001 status report to the district, reported
that the district was making satisfactory progress in meeting the requirements of the
VRP.
12. The district must continually monitor its services to special needs students in the dis-
trict and work to achieve program compliance. Extensive work has been undertaken to
test and place students appropriately, train staff, and to update all student files. These
efforts need to be maintained and continued.
12 Pupil Achievement Pupil Achievement 13
Standard Implemented: Partially Implemented
February 1999 Rating: 0
August 1999 Rating: 1
February 2000 Rating: 3
August 2000 Rating: 4
February 2001 Rating: 4
August 2001 Rating: 4
February 2002 Rating: 6
August 2002 Rating: 6
February 2003 Self Rating: 9
February 2003 New Rating: 7
Implementation Scale:
Not Fully
14 Pupil Achievement Pupil Achievement 15
0 1 2 3 4 5 6 7 8 9 10
2.3 Class Time – Protected for Student Learning
Legal Standard
Class time is protected for student learning. (EC 32212)
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
1. The district has a board policy that addresses student learning time which is sent to the
schools each year. The policy is also distributed at principals’ meetings for posting at
the sites. The updated board policies and administrative regulations have institutional-
ized the practice of protecting class time for student learning.
2. The protection of class time for instruction and student learning continues to be a
required element in each school’s improvement plan. Strategies are developed by
teachers at each site, made part of the school improvement plan, and posted in each
classroom. Strategies include ways to reduce classroom interruptions.
3. The district reports that all schools have significantly reduced the number of public
announcements made during class time. Schools use homeroom period for announce-
ments. Schools also use white boards and bulletin boards in the main office for re-
minders and announcements.
4. Instructional time for students continues to be extended beyond the regular instruc-
tional day and year with opportunities for Saturday school, after school tutorial pro-
grams, and summer extended year programs. Summer school was made mandatory
beginning in summer 2002 for several grade levels of students.
5. The Superintendent has placed a moratorium on field trips scheduled to be taken
during the instructional day from January to the end of the STAR testing period. The
Superintendent has also made it a goal for principals to improve their school student
and staff attendance, targeting a 96% attendance rate for elementary students, a 95%
attendance rate for middle school students, and a 94% attendance rate for high school
students. The goal for teachers and staff is a 97% attendance rate.
14 Pupil Achievement Pupil Achievement 15
Standard Implemented: Fully Implemented – Sustained
February 1999 Rating: 6
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 7
February 2001 Rating: 8
August 2001 Rating: 8
February 2002 Rating: 9
August 2002 Rating: 9
February 2003 Self Rating: 10
February 2003 New Rating: 10
Implementation Scale:
Not Fully
16 Pupil Achievement Pupil Achievement 17
0 1 2 3 4 5 6 7 8 9 10
2.6 General Instructional Programs
Legal Standard
The general instructional program adheres to all requirements put forth in EC 51000-52950.
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
1. The district complies with the mandates of the Education Code 51000 through 52950.
As reported in earlier six-month progress reports, the district has implemented the
recommendation to adopt updated board policies and has established procedures for
reviewing board policies on a regular basis. New or proposed revised board policies
are submitted for review at a board meeting, and acted upon at a subsequent board
meeting.
2. The district is making progress in bringing special programs into compliance. The
district is not in compliance on all requirements of the English Language Learner pro-
gram, and has been referred as a Comité district. The CDE and OCR have visited the
district three times since July 2002 to ensure that the district’s Master Plan for English
Learners was completed and implementation was underway to resolve non-compliant
and Comité items.
3. The district completed the Master Plan for the English Learners in December 2002.
The plan has been approved by the state department. The CDE and OCR will continue
to work closely with the district on the implementation of the plan. A district team
oversees the implementation of the plan and documents all activities relating to the
compliance benchmarks. A district self-audit has been conducted at eight different
schools in November and January to check for compliance.
4. The district is implementing a standards-based curriculum. Curriculum guides reflect-
ing the state standards and identifying benchmarks, are available for all grade levels.
Curriculum guides are being further revised to make them user-friendly. The state
curriculum standards are reflected in the revised report cards, K-5. An Open Court/
English Language Learner Notebook has been developed for teachers to assist ELL
students in using the Open Court texts and materials. All textbooks and library materi-
als are fully aligned with the California Content Standards. Adoption of textbooks is
done at the district level to insure comparability of instruction across the district. Stu-
dent mobility makes this a necessity. The ELD curriculum guide has been developed
and training is scheduled for implementation.
5. As noted elsewhere in this report, a Voluntary Resolution Plan (VRP) has been devel-
oped by the district and is implemented to provide additional services to special needs
students. The first VRP plan was approved in June 2002. A second plan was approved
January 6, 2003.
16 Pupil Achievement Pupil Achievement 17
Standard Implemented: Fully Implemented – Substantial
February 1999 Rating: 5
August 1999 Rating: 6
February 2000 Rating: 6
August 2000 Rating: 7
February 2001 Rating: 7
August 2001 Rating: 7
February 2002 Rating: 8
August 2002 Rating: 9
February 2003 Self Rating: 9
February 2003 New Rating: 9
Implementation Scale:
Not Fully
18 Pupil Achievement Pupil Achievement 19
0 1 2 3 4 5 6 7 8 9 10
2.9 Accountability – Maximum Educational Opportunity
Legal Standard
The district shall be accountable for student results by using evaluative information regarding the
various levels of proficiency and allocating educational resources to assure the maximum educa-
tional opportunity for all students. (EC 60609)
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
1. The district’s Assessment Plan for 2002-2003 has been developed and disseminated.
The Plan includes an overview list and schedule of the assessments for high schools,
middle schools and elementary schools; detail on the Writing Assessment, the CAT-6,
the California High School Exit Exam (CAHSEE), and the California English Lan-
guage Development Test (CELDT).
2. The district’s multiple assessment tools include the district coordinated writing assess-
ments administered four times a year, and the high school proficiency test. Other as-
sessment tools are discussed in further detail in Standard 1.4. Most of the schools have
a Curriculum Specialist or Resource Teacher who serves as the site testing coordina-
tor. Testing Coordinators meet quarterly with the Senior Director of Research, Evalua-
tion, and Assessment. Principals are invited to attend these meetings.
3. Schools have been provided with five years of comparative test data results for all sub
groups of students, to monitor student progress and plan for student improvement.
Schools receive SAT-9, CELDT and CAHSEE and the California Content Standards
test results within two days after the district receives them, with instructions on how to
disseminate test results to parents.
4. Schools develop their annual Single Plan for Student Achievement that contains goals
and objectives for student achievement. Each school has received a summary of test
results to use in developing their school wide action plan. Each school has analyzed
assessment results and developed a test preparation program for their students. Take
home packets are available for student practice.
5. High school staffs have met to address ways to prepare students to pass the high
school exit exam (CAHSEE). The district has initiated a process of “backward map-
ping” using the successful passage of the CAHSEE as the end result and determining
what needs to occur in earlier grades and courses to ensure that this happens. A reme-
diation plan will be developed in spring 2003 to assist students who have not passed
one or both parts of the CAHSEE.
18 Pupil Achievement Pupil Achievement 19
6. All assessment data will be entered into the district’s new Database in order to gener-
ate reports and maintain a current assessment history for all students. The Office of
Research, Evaluation and Assessment has adequate funds to support the district’s as-
sessments.
Standard Implemented: Fully Implemented – Substantial
February 1999 Rating: 2
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 7
February 2003 Self Rating: 9
February 2003 New Rating: 8
Implementation Scale:
Not Fully
20 Pupil Achievement Pupil Achievement 21
0 1 2 3 4 5 6 7 8 9 10
2.10 Measurement of Student Achievement
Legal Standard
Student achievement will be measured using standardized achievement tests and a variety of
measurement tools, i.e., portfolios, projects, oral reports, etc. (EC 60602, 60605)
Consent Decree Stipulation
This standard was identified in the Consent Decree in the action Serna v Eastin, Case No. BC
174282, as needing to reach a rating of 8 to be deemed compliant.
Progress on Recommendations and Recovery Steps
1. This standard also is discussed in Standards 1.4 and 2.9. The district’s Assessment
Plan for 2002-2003 includes an overview list and schedule of the assessments for high
schools, middle schools and elementary schools; detail on the Writing Assessment, the
SAT-9, the California High School Exit Exam (CAHSEE), and the California English
Language Development Test (CELDT). The district’s Assessment Plan needs to also
include clear objectives of why testing is occurring and how results are to be used,
rather than establishing a calendar of test dates.
2. The district’s multiple assessment tools continue to include the district coordinated
writing assessments administered four times a year, and the high school proficiency
test. Other assessment tools are discussed in further detail in Standard 1.4. Most of
the schools have a Curriculum Specialist or Resource Teacher who serves as the site
testing coordinator. Testing Coordinators meet quarterly with the Senior Director of
Research, Evaluation, and Assessment. Principals are invited to attend these meetings.
3. The district reports that the following assessments are aligned to instruction: AIMS
web (grades 1-5), the district’s Writing Assessments, CAHSEE, SAT-9 (changed to
CAT-6 in 2003) and the California Standards Tests. Assessments that are imbedded in
the curriculum include Open Court, Saxon, Language, and teacher generated tests.
4. The English Language Development (ELD) Benchmark Assessment for grades K-12
has been completed for implementation in fall, 2003. The assessment will be adminis-
tered quarterly.
5. The Senior Director of Research, Evaluation, and Assessment provides an overview
of the STAR program test results in August to administrators and district staff, and
meets with school staffs when requested by the principal. Test results are available in
a variety of formats for school use. Meetings with individual principals are held to in-
crease understanding and interpretation of test scores. Principals meet with their staffs
at the beginning of the school year to review test scores and identify areas of instruc-
tional focus for the year. Assessment results were prepared for all principals to use in
completing their school action plans as required by the district. Multiple assessments
are used to evaluate school wide improvement required for district, HPSP, CSRD and
II/USP schools. Multiple assessments are also used for academic placement, Student
Study Team Reviews and re-designation of special needs students.
20 Pupil Achievement Pupil Achievement 21
6. Training workshops on the district’s assessment tools continue to be provided to
administrators and teachers. Assessment training takes place quarterly at Test Coor-
dinators’ Meetings. Principals are invited to attend. The Senior Director of Research,
Evaluation, and Assessment attends all District Coordinators’ meetings and keeps
district office staff and principals informed regarding statewide tests.
7. Middle school and high school principals and staff participated in CAHSEE training.
CELDT training has been completed in preparation for the 2003 CELDT administra-
tion. All schools have a team of assessors who will administer the CELDT test begin-
ning July 1, 2003.
8. The district is utilizing all pertinent tests that are required, as well as additional tests,
e.g. course “challenge” tests, to assess student performance. The pre-, mid-year and
post- math, reading and language district assessments are administered at the elemen-
tary and middle schools and serve as a monitoring system to ensure sufficient student
progress.
Standard Implemented: Fully Implemented – Substantial
February 1999 Rating: 0
August 1999 Rating: Not Reviewed
February 2000 Rating: Not Reviewed
August 2000 Rating: 5
February 2001 Rating: 6
August 2001 Rating: 6
February 2002 Rating: 7
August 2002 Rating: 8
February 2003 Self Rating: 9
February 2003 New Rating: 8
Implementation Scale:
Not Fully
22 Pupil Achievement Pupil Achievement 23
0 1 2 3 4 5 6 7 8 9 10
Chart of
Pupil Achievement Standards
Progress Ratings Toward Implementation of the Recovery Plan
22 Pupil Achievement Pupil Achievement 23
24 Pupil Achievement Pupil Achievement 25
Pupil Achievement
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug.
Timeline/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Focus
The district through its adopted
policy provides a clear
1.1 0 3 5 7 8 NR NR 9 NR Implemented
operational framework for
management of the curriculum.
The district has clear and valid
1.2* objectives for students, 0 2 3 5 6 6 7 8 8 ❑ Implemented
including the core curriculum
content.
The district directs its resources
1.3 fairly and consistently to 0 2 4 5 6 NR NR 7 NR June 2002
accomplish its objectives.
The district has adopted multiple
assessment tools, including
1.4* diagnostic assessments, to 0 2 4 6 6 6 6 7 8 ❑ Implemented
evaluate, improve, or adjust
programs and resources.
Expectations and a practice exist
to improve the preparation of
1.5* students and to build school 0 3 NR 5 5 5 6 6 7 ❑ June 2003
structure with the capacity to
serve all students.
The assessment tools are clear
measures of what is being taught
1.6 0 NR NR 4 6 NR NR 7 NR June 2002
and provide clear direction for
improvement.
Staff development provides staff
with the knowledge and the
1.7 3 4 5 6 7 NR NR 7 NR June 2002
skills to improve instruction and
the curriculum.
Staff development demonstrates
a clear understanding of
1.8 3 5 6 7 7 NR NR 7 NR June 2002
purpose, written goals, and
appropriate evaluations.
Evaluations provide constructive
1.9 feedback for improving job 0 3 4 5 5 NR NR 6 NR June 2002
performance.
Teachers use a variety of
1.10* instructional strategies and 0 NR 3 4 4 5 6 7 7 ❑ June 2003
resources that address their
students' diverse needs.
NR not reviewed
targeted for review
24 Pupil Achievement * must reach score of 8 Pupil Achievement 25
per consent decree
Pupil Achievement (continued)
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug.
Timeline/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Focus
Students are engaged in learning
1.11* and they are able to demonstrate 0 NR 3 4 5 5 6 7 7 ❑ June 2005
and apply their knowledge and
skills.
The standards developed by the
California Standards for the
1.12 0 NR 3 5 5 5 NR 8 NR Implemented
Teaching Profession are present
and supported.
Teachers modify and adjust
1.13 instructional plans according to 0 NR 3 4 4 5 NR 6 NR June 2003
student needs and success.
Challenging learning goals and
1.14 instructional plans and programs 0 NR 3 4 5 5 NR 6 NR June 2003
for all students are evident.
The administration and staff
utilize assessment information to
1.15 0 1 4 5 6 NR NR 7 NR June 2002
improve learning opportunities
for all students.
A common vision of what all
1.16* students should know and be 0 NR 4 5 6 6 6 6 7 ❑ June 2003
able to do exists and is put into
practice.
Goals and grade level
1.17 performance standards based on 3 NR 4 5 5 5 NR 6 NR June 2001
a common vision are present.
Every elementary school has
embraced the 1997 California
1.18 6 NR 6 7 8 NR NR 8 NR Implemented
School Recognition Program
Standards.
Efforts will be made by the
district to partnership with state
1.19 colleges and universities to 8 NR 8 9 10 NR NR 10 NR Implemented
provide appropriate courses
accessible to all teachers.
Administrative support and
1.20* coaching are provided to all 0 3 4 5 6 6 7 7 8 ❑ Implemented
teachers.
1.21* Professional development is 0 3 4 5 5 5 7 7 8 ❑ Implemented
linked to personnel evaluation.
Collaboration exists between
higher education, district,
1.22 professional associations and 7 NR NR 8 9 NR NR 9 NR Implemented
community in providing
professional development.
NR not reviewed
targeted for review
26 Pupil Achievement * must reach score of 8 Pupil Achievement 27
per consent decree
Pupil Achievement (continued)
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug.
Timeline/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003 2003
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Focus
Initial placement procedures are
in place to ensure the timely
1.23* and appropriate placement of all 0 1 3 4 4 4 6 6 7 ❑ June 2003
students with particular
emphases being placed on
students with special needs.
Clearly defined discipline
practices have been established
1.24 and communicated among the 8 NR NR 8 9 NR NR 10 NR Implemented
students, staff, board and
community.
The district will ensure that all
1.25* instructional materials are 4 NR NR 5 5 5 6 7 8 ❑ Implemented
available to all students.
The district has adopted a plan
1.26 for integrating technology into 0 4 5 6 7 NR NR 8 NR Implemented
the curriculum.
The district's planning process
ensures focus and connectivity
1.27 0 NR NR 4 5 5 NR 6 NR June 2002
to increased student
productivity.
Human Resources practices
1.28 support the delivery of sound 0 NR NR 5 5 5 NR 6 NR June 2004
educational programs.
AIDS prevention instruction
occurs at least once in junior
high or middle school and once
2.1 8 NR 8 8 9 NR NR 10 NR Implemented
in high school and is consistent
with the CDE's 1994 Health
Framework.
On a yearly basis, the district
notifies all 11th and 12th grade
2.2 students regarding the California 6 NR NR 7 8 NR NR 9 NR Implemented
High School Proficiency
Examination.
2.3* Class time is protected for 6 NR NR 7 8 8 9 9 10 ❑ Implemented
student learning.
Categorical and compensatory
program funds supplement, and
2.4
do not supplant services and 0 3 4 5 6 NR NR 6 NR June 2002
materials to be provided by the
district.
A requirement is in place for
passing of a basic skills
2.5 8 NR NR 8 10 NR NR 10 NR Implemented
proficiency examination by
instructional aides.
NR not reviewed
targeted for review
26 Pupil Achievement * must reach score of 8 Pupil Achievement 27
per consent decree
Pupil Achievement (continued)
Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug. Feb. Aug.
Timeline/
Standard to be addressed 1999 1999 2000 2000 2001 2001 2002 2002 2003- 2003
Goal
Rating Rating Rating Rating Rating Rating Rating Rating Rating Focus
The general instruction program
2.6* adheres to all requirements set 5 6 6 7 7 7 8 9 9 ❑ Implemented
forth in (EC 51000-52950).
All incoming kindergarten
students will be admitted
2.7 following board-approved 8 NR NR 9 10 NR NR 10 NR Implemented
policies and administrative
regulations.
The district shall inform parents
of the test scores of their
2.8 8 NR NR 9 10 NR NR 10 NR Implemented
children, and provide general
explanation of these scores.
The district shall be accountable
for student results by using
evaluative information regarding
2.9* the various levels of proficiency 2 NR NR 5 6 6 7 7 8 ❑ Implemented
and allocating educational
resources to assure the maximum
educational opportunity for all
students.
Student achievement will be
measured using standardized
2.10* achievement tests and a variety 0 NR NR 5 6 6 7 8 8 ❑ Implemented
of measurement tools, ie.,
portfolios, projects, oral reports,
etc.
NR not reviewed
targeted for review
28 Pupil Achievement * must reach score of 8
per consent decree