FCMAT
Comprehensive Review Executive Summary
Read the report at Oakland Unified School District ↗
Oakland Unified
School District
Assessment and Recovery Plan
Second Six-Month Progress Report
September 30, 2004
Submitted by
Fiscal Crisis & Management Assistance Team
Executive
Summary
Introduction
This report, dated September 30, 2004, is the second of two six-month reports required by Sen-
ate Bill 39 (Perata) of the progress made by the Oakland Unified School District to address the
recommendations of the Oakland Unified School District Assessment and Recovery Plan first
developed for the district by the Fiscal Crisis and Management Assistance Team (FCMAT) in
January 2000. This report provides data to the district, community and Legislature to assist the
district in achieving fiscal solvency, to build the necessary capacity within the district to promote
student learning, and to assist the district to work toward the return of local governance.
Senate Bill 39, signed into law on May 30, 2003, required the Superintendent of Public Instruc-
tion to assume all the legal rights, duties and powers of the Governing Board of the Oakland Uni-
fied School District and to appoint an administrator to act on his behalf in the school district. The
bill appropriated $100 million as an emergency loan to the Oakland Unified School District to
cover cash flow needs, the district’s structural budget deficit, and to mitigate the impact of future
deficit spending.
The district requested $65 million of the $100 million on June 4, 2003 in order to make the June
payroll and cover the severe negative cash position of the district. The remainder of the $100
million authorized by the legislation is available to the district as a line of credit. The emergency
loan is amortized over a 20-year period.
Senate Bill 39 also required that FCMAT prepare an improvement plan for the school district
by July 1, 2003, by updating the Oakland USD Assessment and Recovery Plan developed by
FCMAT for the district in January 2000. Senate Bill 39 required FCMAT to report on the imple-
mentation of the improvement plan beginning in September 2003 and continuing with six-month
progress reports in March 2004 and September 2004.
On July 1, 2003, FCMAT reported to the Superintendent of Public Instruction that the January
2000 Oakland USD Assessment and Recovery Plan prepared for the district remained a viable
improvement plan, but that the ratings for the professional and legal standards first reported in
January 2000 needed to be updated in order to provide new baseline data to determine the prog-
ress made by the district over time.
On September 30, 2003, FCMAT issued the Oakland USD Assessment and Recovery Plan
Update that provided updated ratings, based on an assessment of district operations in summer
2003, for each professional and legal standard first reported in January 2000. The Recovery Plan
Update also included the assessment of several additional standards that reflected new laws or
regulations that became effective subsequent to January 2000. The Recovery Plan Update also
established criteria for the district’s eventual return to local governance and identified a prior-
ity subset of the total array of professional and legal standards for the district to focus on in its
recovery.
In March 2004 FCMAT provided the first six-month progress report of the Oakland Unified
School District’s efforts to address the recommendations in the identified priority subset of legal
and professional standards. Ratings for the standards reflected the progress made by the district
since the September 30, 2003 Recovery Plan Update was issued.
Executive Summary 5
This September 2004 report continues to assess the district’s progress in addressing the recom-
mendations in the identified subset of 135 legal and professional standards. Ratings for the stan-
dards reflect the progress made by the district since the March 30, 2004 First Six-Month Progress
Report was issued.
Although Senate Bill 39 required FCMAT to conduct ongoing monitoring reports only through
September 2004, the California Department of Education plans for FCMAT to continue to moni-
tor the district’s progress for the district’s eventual return to local governance. Funding for a
subsequent annual assessment is proposed in Assembly Bill 2525, now enrolled for the Gover-
nor’s consideration and anticipated signature.
The findings presented in this progress report represent a snapshot of the district at a specific
period in time. Since the data-gathering for this report, the district has continued to address the
recommendations in the Assessment and Recovery Plan.
6 Executive Summary
Study Guidelines
FCMAT’s approach to implementing the statutory requirements of SB 39 is based upon a com-
mitment to a standards-based, independent and external review of the Oakland Unified School
District’s operations. FCMAT performed the initial assessment of the district in fall 1999 and
developed the improvement plan in collaboration with five other external providers selected
through a competitive process. Professionals from throughout California contributed their knowl-
edge and applied the identified legal and professional standards to the specific local conditions
found in the Oakland Unified School District. The initial assessment was reported to the district
in a document entitled Oakland Unified School District Assessment and Recovery Plan, January
31, 2000.
The five provider agencies again contributed their expertise in assisting FCMAT to conduct the
follow-up reviews of the district. The Assessment and Recovery Plan Update, September 30,
2003 provided updated ratings of the standards first reported in January 2000. The Assessment
and Recovery Plan, First Six-Month Progress Report, March 2004 reflected the district’s prog-
ress in addressing the legal and professional standards in the six month period since September
2003. The Assessment and Recovery Plan, Second Six-Month Progress Report, September 2004
reflects the district’s progress since March 2004.
Prior to beginning work in the district in 1999, FCMAT adopted five basic tenets to be incor-
porated in the assessment and improvement plans. These tenets were based on previous assess-
ments conducted by FCMAT in school districts throughout California and a review of data from
other states implementing external reviews of troubled school districts. These tenets formed the
basis of FCMAT’s continued work in the district. The five basic tenets are:
1. Use of Professional and Legal Standards
FCMAT’s experience indicates that for schools and school districts to be successful in program
improvement, the evaluation, design and implementation of improvement plans must be stan-
dards-driven. FCMAT has noted positive differences between an objective standards-based
approach versus a nonstandards-based approach. When standards are clearly defined, reachable,
and communicated, there is a greater likelihood they will be measured and met.
In order to participate in the process of the Oakland Unified School District review, potential
providers responded to a Request for Applications (RFA) that identified these standards as the
basis of assessment and improvement. Moreover, the providers were required to demonstrate
how the FCMAT-identified standards would be incorporated into their work. It is these standards
on which the improvement plans for the Oakland district were based. The standards, while iden-
tified specifically for the Oakland Unified School District, are benchmarks that could be readily
utilized as an indication of success for any school district in California.
Every standard was measured on a consistent rating format, and each standard was given a scaled
score from zero to 10 as to its relative status of completeness. The following represents a defini-
tion of terms and scaled scores. The single purpose of the scaled score is to establish a baseline
of information by which the district’s future gains and achievements in each of the standard areas
can be measured.
Executive Summary 7
Not Implemented (Scaled Score of 0)
There is no significant evidence that the standard is implemented.
Partially Implemented (Scaled Score of 1 through 7)
A partially implemented standard lacks completeness, and it is met in a limited degree. The de-
gree of completeness varies as defined:
1. Some design or research regarding the standard is in place that supports preliminary
development. (Scaled Score of 1)
2. Implementation of the standard is well into the development stage. Appropriate staff is
engaged and there is a plan for implementation. (Scaled Score of 2)
3. A plan to address the standard is fully developed, and the standard is in the beginning
phase of implementation. (Scaled Score of 3)
4. Staff is engaged in the implementation of most elements of the standard. (Scaled
Score of 4)
5. Staff is engaged in the implementation of the standard. All standard elements are de-
veloped and are in the implementation phase. (Scaled Score of 5)
6. Elements of the standard are implemented, monitored and becoming systematic.
(Scaled Score of 6)
7. All elements of the standard are fully implemented, are being monitored, and appro-
priate adjustments are taking place. (Scaled Score of 7)
Fully Implemented (Scaled Score of 8-10)
A fully implemented standard is complete relative to the following criteria.
8. All elements of the standard are fully and substantially implemented and are sustain-
able. (Scaled Score of 8)
9. All elements of the standard are fully and substantially implemented and have been
sustained for a full school year. (Scaled Score of 9)
10. All elements of the standard are fully implemented, are being sustained with high qual-
ity, are being refined, and have a process for ongoing evaluation. (Scaled Score of 10)
2. Conduct an External and Independent Assessment
FCMAT employed an external and independent assessment process in the development of the
Oakland Unified School District assessment and improvement plans. FCMAT’s reports represent
findings and improvement plans based on the external and independent assessments from various
professional agencies. The following five agencies assisted in the initial January 31, 2000 report,
the subsequent September 30, 2003 update report, and the six-month progress reports of March
2004 and September 2004:
• California School Boards Association (CSBA) – Community Relations and Governance
• Schromm and Associates – Personnel Management
• Curriculum Management Systems, Inc. (formerly CA Curriculum Management Audit
Center) – Pupil Achievement
• MGT of America – Facilities Management
• School Services of California – Financial Management
Collectively, the five professional agencies that assisted FCMAT constitute FCMAT’s providers
in the assessment process. Their external and independent assessments serve as the primary basis
for the reliability, integrity and credibility of the review.
8 Executive Summary
3. Utilize Multiple Measures of Assessment
For a finding to be considered legitimate, multiple sources need to be utilized to provide the
same or consistent information. The assessments and improvement plans were based on multiple
measures. Testing, personal interviews, group meetings, public hearings, observations, review
and analysis of data all provide added value to the assessment process. The providers were re-
quired to utilize multiple measurements as they assessed the standards. This process allowed for
a variety of ways of determining whether the standards were met. All school district operations
with an impact on student achievement, including governance, fiscal, personnel, and facilities
were reviewed and included in the improvement plan.
4. Empower Staff and Community
The development of a strong professional development plan for the board and staff is a criti-
cal component of an effective school district. All FCMAT reports include the importance of a
comprehensive professional development plan. The success of the improvement plans and their
implementation are dependent upon an effective professional and community development
process. For this reason, the empowerment of staff and community is one of the highest priori-
ties, and emphasizing this priority with each of the five partners was critical. As a result, a strong
training component for board, staff and administration is called for consistently throughout the
report.
Of paramount importance is the community’s role of local governance. The absence of parental
involvement in education is a growing concern nationally. A key to success in any school district
is the re-engagement of parents, teachers, and support staff. Parents care deeply about their chil-
dren’s future and most want to participate in improving the school district and enhancing student
learning. The community relations section of the reports provide necessary recommendations for
the community to have a more active and meaningful role in the education of its children.
5. Engage Local, State and National Agencies
It is critical to involve various local, state and national agencies in the recovery of the district.
This was emphasized through the Request for Applications (RFA) process, whereby state-recog-
nized agencies were selected as partners to assist with the assessment and improvement process.
The California Department of Education, city and county interests, professional organizations,
and community-based organizations all have expressed and shown a desire to assist and partici-
pate in the improvement of the Oakland Unified School District.
Executive Summary 9
Study Team
The study team was composed of the following members:
For FCMAT
Roberta Mayor
Leonel Martínez
For the California School Boards Association – Governance/Community Relations
Paul Richman Holly Jacobson
Ben Bartos Davis Campbell
Diane Green Martin Gonzalez
Bode Odewele
For the Curriculum Management Systems, Inc. – Pupil Achievement
William Streshly Eve Proffitt
Olive McArdle Susan Burleson
Penny Gray James Scott
For Schromm Associates – Personnel Management
Richard A. Schromm
Jack M. Weinstein
For MGT of America – Facilities Management
Janelle Kubinec
Rachel Ehlers
Dave Teater
For School Services of California – Financial Management:
Jerry Twomey
John Gray
10 Executive Summary
Summary of Principal Findings and Recommendations
Section Two of this report provides an in-depth review of the progress made by the district on the
recommendations made in the identified subset of standards reported in the January 2000 Oak-
land Unified School District Assessment and Recovery Plan, the September 2003 Assessment
and Recovery Plan Update, and the March 2004 Assessment and Recovery Plan, First Six-Month
Progress Report. The following is a summary of the general findings and recommendations that
are presented in greater detail by operational area in Section Two of this report.
This September 2004 Assessment and Recovery Plan, Second Six-Month Progress Report rep-
resents data collection and analysis at a specific point in time. FCMAT review teams visited the
district in May, August and September 2004. This report was presented to the Oakland Unified
School District and Superintendent of Public Instruction on September 30, 2004 and will be for-
mally presented to the district advisory board at its regular board meeting in mid-October 2004.
GENERAL OVERVIEW
In the year since state receivership began, the district has continued to make modest progress in
addressing the recommendations of the Assessment and Recovery Plan. The average ratings in
the five operational areas reflect reasonable and positive gains.
• The district implemented a new human resources/payroll module in January 2004, which
integrates personnel, payroll, and position control.
• The district implemented budget blocking to prevent overrides of the encumbrance
system, which precludes expenditures if sufficient funds are not available.
• Increased fiscal scrutiny enabled the district to successfully reduce the size of the
district’s deficit.
• The district increased monitoring of special education expenditures, made appropriate
program modifications and reduced slightly the size of the special education program
encroachment to the general fund.
• The district has implemented a results-based budgeting process. This process will assist
site administrators to better understand effective utilization of limited resources.
• The district has initiated a standards-based performance emphasis in evaluation of district
employees.
• The district successfully passed a parcel tax on March 2, 2004 that provides
supplementary funds for district programs.
• The staffing process for the opening of the 2004-05 school year was greatly improved
with few classroom vacancies occurring.
• Many board policies have been updated and approved and are available for viewing on
the district web site.
Executive Summary 11
The district has taken a number of necessary actions to move the district toward recovery, but
continues to face a myriad of problems that will take time to remedy. Many of these same prob-
lems were noted in the March 2004 report, and continue to challenge the district.
• The size of the district deficit and previous deficit spending patterns will require time for
the district to redress. Expenditures continue to surpass revenues and will continue to do
so in the 2004-05 budget year.
• The completion of the district’s Fiscal Recovery Plan is an urgent priority, necessary to
address and remedy the district’s deficit spending in the future.
• The district’s student enrollment continues to decline, further decreasing the district’s
incoming revenues.
• The district has filled many of the senior fiscal management vacancies. The new staff
members face a learning curve that may affect the district’s efforts to achieve a speedy
fiscal recovery.
• Updating the Facilities Master Plan to provide long-range guidance for addressing the
district’s facilities needs remains a top priority but will require time to do effectively.
• Developing staff capability in all operational areas remains a continuing challenge.
• Although administrative technology systems have greatly improved, the level of
utilization is not sufficient. In addition, an appropriate student information system is
needed to replace the inadequate SASI system.
• Student academic performance has improved slightly but scores are still lower than the
state average at every grade level.
The district should also assess the effectiveness of the initiatives that have been implemented in
the last year. The speed with which results-based budgeting was initiated and the ongoing cre-
ation of small schools in the district have caused some initial operational difficulties. Although
board members and many staff support the new directions, many have indicated discontent with,
and lack of input to, the process. Some staff members lack a clear understanding of the initia-
tives or lack appropriate training for successfully implementing them.
12 Executive Summary
COMMUNITY RELATIONS AND GOVERNANCE
In the area of Governance and Community Relations, the Oakland Unified School District has
demonstrated progress on many of the priority standards during the past six months, most nota-
bly those related to policy development. The district also continues to make efforts to strengthen
overall communications, parent-community relations and the effectiveness of district and school
advisory councils, although not all of these efforts have produced the desired results. A number
of significant, positive steps have also been taken relative to boardsmanship, although the board
continues to seek to clarify its appropriate role and level of engagement during this time when
the state maintains authority over the district’s affairs.
Communications
The district continues to pursue a range of strategies to strengthen both internal and external com-
munications. Most elements of the communications and marketing plan adopted in February
2004 are being effectively implemented, although there is a need for ongoing strengthening of the
district’s media relations. In addition to continuing many of its previous activities (e.g., a weekly
e-mail bulletin, site visits by the State Administrator), the district has expanded its activities to
include a new staff and department directory, more effective use of electronic communications, an
update of the district’s Web site to provide more pertinent information, and launching of a cable
television show by the State Administrator. Much of the recent communications work has focused
on using multiple avenues to explain the district’s new results-based budgeting system.
Parent-Community Relations
Outreach to involve parents and community members in the schools is ongoing. Within the
past six months, the district strongly encouraged parents to be informed about the results-based
budgeting initiative by holding a summer institute with information geared specifically towards
parents. Parents are also encouraged to be involved in programs aimed at improving campus
safety and increasing student attendance. The administration’s cable television show added an-
other avenue for increased communications with parents and community members. The greatest
challenge continues to be increasing the involvement of underrepresented and disenfranchised
parents and community members.
Collaboratives/District Advisory Councils/School Site Councils
The most notable improvement in this area was the district’s clearer delineation of the statutory
objectives of the site and district councils. However, the extent to which parent members under-
stand the council’s goals is inconsistent. Trainings are scheduled to begin this fall to ensure that all
members clearly understand the purpose and goals of the councils. The membership of these groups
continues to lack sufficient diversity, despite the district’s additional outreach efforts to encourage
greater participation of parents of ethnically varied backgrounds. The overall effectiveness of dis-
trict and site councils varies and is largely determined by the leadership of the principal at each site.
Policy
In the past six months, a large number of district policies were reviewed and adopted, and updat-
ing the policy manual has been nearly completed. Most district policies are now up to date and
reflect current law. The updated policy manual is now on-line and accessible in the district office
lobby via public access computers. As the district works to maintain its policy manual with
periodic reviews, it will be important to formalize the policy development process in order to ef-
fectively utilize available resources and ensure adequate staff and public input.
Executive Summary 13
Board Roles/Boardsmanship
In May, the board returned to being a seven-member, all-elected body, with the elimination of
three mayoral-appointed positions. At that time, a new board majority elected new officers who
have articulated a more public willingness to work cooperatively with the State Administrator in
the district’s recovery. The board has also worked to clarify when individual board members are
presenting personal views and when they are representing the board or the district. Relationships
among individual board members remain functional, courteous and respectful. Collectively,
board members do not feel they have a cohesive sense of what their appropriate oversight role
should be, either during state administration or after local governance is restored. The board and
administration have participated in governance training and are committed to a series of addi-
tional governance workshops in the future.
Board Meetings
Meetings are run efficiently and presentations on important student-related matters have been
provided by the staff at these meetings. The district also holds board study sessions and public
forums as ways to facilitate further discussion of important issues and solicit feedback. Regular
board meetings have not been well attended by board members in the past six months. There is
frustration among most board members who feel that, because of their advisory status, they are
not truly involved in the decision-making process and do not have meaningful input into deci-
sions. It is critical that board members consistently attend board meetings and workshops and
continue to enhance their understanding of, and commitment to, effective governance roles.
In Summary
The review of Community Relations and Governance included the assessment of 26 selected
professional and legal standards of performance. Of the 26 standards, 25 were partially implemented,
with ratings between one and seven, and one standard was fully implemented with a rating of 8.
The average rating of the subset of 26 standards in this operational area in September 2003 was
3.92 on a scale of 1 to 10 with 10 the highest score possible. The average rating in March 2004
was 4.54 and the average rating in September 2004 is 5.73.
14 Executive Summary
PERSONNEL MANAGEMENT
There has been little stability or consistency within the Human Resources Division in the past
year. Constant change has created morale problems and some degree of poor service delivery.
There also is a need for considerable training and retraining for employees.
Other significant events within the division include the implementation of the Results Based
Budgeting process, which allows site administrators to determine their certificated and classi-
fied staffing by the amount of their available budget. This concept is a significant change for the
financial and human resources staff dealing with staffing and position control.
The division’s efforts during the past six months in recruitment and selection of employees have
greatly improved, resulting in fewer vacancies. It was reported that approximately 56 classified
positions were unfilled in the first week of August. Last year at the same time there were 171 va-
cancies. The return to work program has 34 individuals returned to modified work status, which
is a very positive development.
Organization, Planning and Communications
The Human Resources Division presented the Governing Board in February 2004 with informa-
tional documents identifying the division’s planned priorities and tasks to address the FCMAT
recommendations. A major endeavor in planning was the reorganization of the division and the
reduction of personnel staff.
The HR Division leadership conducts weekly informational meetings. The five division units
conduct scheduled meetings for internal communications. Communication among the five divi-
sion units could be improved.
Employee Recruitment, Selection and Orientation
Recruitment training was provided to all division staff members who have responsibility for
teacher recruitment. The training included application review, interview techniques, reference
checks and other recruitment requirements. Training for site and district administrators who are
involved in teacher selection is expected to be completed prior to the 2005 recruitment season.
The HR Division developed a written recruitment calendar of 2004-05 recruitment activities identify-
ing recruitment dates, locations, recruiters and costs. There is no formalized process or district form
for district reference checking. Some administrators informally do reference checks of candidates they
wish to hire. All reference check forms should be retained in the Human Resources Division.
Classified position vacancies are posted on the district Web page and on the Classified Hot Line.
These postings should be updated on a weekly basis. A status report of all classified and certifi-
cated vacancies is compiled daily. A written recruitment and selection process and procedures
for classified staffing should be developed and distributed to district- and site-level administra-
tive staff. Handbooks should be developed for new classified employees.
The Bi-Tech installation and the Results Based Budgeting (RBB) process have not provided a
fully operative position control system for the HR Division.
Executive Summary 15
Human Resources Operational Procedures and Use of Technology
The division needs to develop an operational procedures manual that standardizes all procedures
used in the division.
The Bi-Tech software conversion has been extremely difficult. The Payroll and Personnel depart-
ments must establish a more cooperative relationship in order to eliminate mistakes that result in
some employees not receiving their paychecks. There were 120 employees who did not receive
paychecks for August. Regularly scheduled meetings must be held to ensure the timeliness and
accuracy of employee pay processing.
All job descriptions must be reviewed, updated and submitted to the State Administrator/ Gov-
erning Board for approval. The appropriate unions must be involved to ensure that contractual
provisions are in agreement.
Staff Training and Evaluation, Due Process Assistance
The Human Resources Division must provide the training to site and district staff to make them
aware of the Americans with Disabilities Act (ADA) requirements. The district also must guaran-
tee employees their rights under the federal Family and Medical Leave Act (FMLA). A procedure
and forms must be developed and followed.
Division staff will be provided training this fall by the Legal Services Staff Attorney on certifi-
cated and classified evaluation and dismissal. Staff will be expected to provide the same training
to their principals’ network.
The HR Division plans to provide sites and departments with a list this fall of individuals in need
of evaluation. This task may be more difficult to accomplish as a result of the discovery that
performance review data from Human Resources was lost during the conversion to the Integrated
Financial Accounting System (IFAS).
Employer/Employee Relations and Benefits
The responsibility for negotiating the contract with the Oakland Teachers Association has been
turned over to Legal Services. The negotiations team will include the Deputy Superintendent of
Business Services and the Assistant Superintendent of Human Resources. The district has pro-
posed 60 contract changes and the Oakland Teachers Association has proposed 99 changes.
Workers’ compensation administration is now handled by a Risk Management Officer in the
Business Services Division. During the past six months, a return to work program has been
implemented, which has returned a number of employees to modified work status.
In Summary
The review of Personnel Management included the assessment of 25 selected professional and
legal standards of performance. Of the 25 standards, 24 were partially implemented with ratings
between one and seven, and one standard was not yet implemented.
The average rating of the subset of 25 standards in this operational area in September 2003 was
2.64 on a scale of 1 to 10 with 10 the highest score possible. The average rating in March 2004
was 2.80 and the average rating in September 2004 is 3.96.
16 Executive Summary
PUPIL ACHIEVEMENT
The Oakland Unified School District continues to make progress toward implementing the Pupil
Achievement recommendations of the Assessment and Recovery Plan of January 31, 2000. The
2004 scores on the California Standardized Testing and Reporting (STAR) tests reveal some stu-
dent achievement gains; however, overall scores remain very low. The district continues to make
gains in the establishment of instructional program management based on the systematic use of
data. A draft budget planning manual has been developed to guide district administrators through
the results-based budgeting process.
Control of Resources, Programs, and Personnel
The board has adopted new policies that provide general direction to guide curriculum design
and delivery. A policy that adequately directs curriculum management has not been developed.
Instead, curriculum management is guided by the district Instructional Framework. The frame-
work is designed to provide direction for district operations in separate plans — assessment,
professional development, results-based budgeting, equity, and curriculum. It stipulates that the
state standards are the core of the district’s written curriculum.
The board has adopted an assessment policy that calls for student and program assessment, but
not for assessment of the organization. District formative assessments are identified within text-
book adoptions for reading (K-5), mathematics (K-high school), English Language Development
and Intervention (grade 6-high school), and science (grades 6 and 8). A time line is provided for
further testing in science at the middle schools and social science at the high schools. The plan
does not address comprehensive assessment of all subjects at all grade levels, nor does it require
ongoing evaluation of the assessment plan or organizational structures linked to student achieve-
ment. The plan calls for assessment to be aligned with textbook adoptions in the core areas.
The Governing Board has adopted a policy that acknowledges long-range planning as an integral
component of the district’s growth and development.
Clear and Valid Objectives for Students
The district lacks a comprehensive curriculum management plan, however, policies linked to the
elements of a curriculum management plan were presented to the Governing Board in August
and include many of the quality components of a curriculum management plan as recommended
by FCMAT.
The district has abandoned the development of traditional curriculum guides. Instead, the admin-
istration decided to select and adopt several standards-based textbook series and supplement them
with district-designed pacing guides to give teachers the necessary specificity for clear direction.
A cross-section sample of district schools was again visited by the study team. The textbook
curriculum strategy had gained general teacher support and was resulting in teaching directed at
the California Standards. However, when the textbook teacher editions and pacing guides were
reviewed and rated for adequacy as guides for instruction, they rated slightly lower than the
minimum required by the Assessment and Recovery Plan of 2000. Administrators plan to work
with teacher leaders during summer 2004 to revise the pacing guides based on identified student
learning needs.
Executive Summary 17
Internal Consistency and Rational Equity in Program Development and Implementation
Progress has been made with the compliance issues within the special education programs. The
backlog of IEP reviews had been reduced by nearly 75 percent by mid-August 2004. Expensive
nonpublic school placements have been reduced, and staff development with principals to reduce
referrals is planned. The team noted deficiencies with the monitoring of revised IEPs, a lack
of school site accountability for special programs, and a lack of special education performance
standards for teachers.
Faculty continue working to implement the Master English Language Learner Plan which has
been accepted by the Comité with the California Department of Education. In addition, aspects
of the ELL program have been incorporated in the Professional Development Plan adopted by
the board. However, actual classroom implementation of the California Department of Educa-
tion criteria is still inadequate. Progress has been made enforcing the provisions of the Voluntary
Resolution Plan; however, personnel are not being held accountable through timely evaluations.
No further progress is being made in developing a data system to assess the effectiveness of EL
programs in improving student achievement.
Use of Assessments to Improve Programs
Substantial progress has been made in developing assessment tools. Assessments for core sub-
jects through grade 12 have been completed. As noted in the March 2004 review, the staff has
a multiyear plan to develop a full range of assessments across grades. Full implementation of
the assessment system is scheduled for the upcoming school year. All principals continue to be
trained in the use of data and assessment with assistance from the executive directors.
The district’s Web site and data portal are providing useful benchmark data for Open Court,
Harcourt Brace, and High Point. Assessment data continue to be used by some principals and
teachers to help teachers find patterns of strengths and weaknesses in their teaching. The dis-
trict’s data coaches are assisting 34 schools in using the district’s database tools more effectively.
However, there is no indication that the training is improving classroom instruction.
Continued progress is being made in the district’s systems for disaggregating data by race/ethnic-
ity, gender, socioeconomic factors, and language. The district provides these data in usable form
to gauge operational performance and to improve instructional programs and decision-making.
However, no progress has been made to expand the scope of local assessments to include all
required subjects at all grade levels. The present focus is on reading/language arts and math.
Student achievement continues to be a major concern. The district’s 2004 scores on the Califor-
nia Standardized Testing and Reporting (STAR) test released this summer reported the percent-
age of Oakland students scoring “proficient” or “advanced” was lower than the state average at
every grade level. Moreover, the percentage of Oakland students scoring “below basic” and “far
below basic” was higher than the state average at every grade level.
Improved Organizational Productivity
The staff is implementing results-based budgeting. This is a multiyear process designed to
provide a more consistent, transparent, and equitable allocation of funds than in the past. The
budget planning manual is still in draft form. The system has the potential to increase the dis-
trict’s educational productivity. However, the system does not establish processes and criteria
for evaluating the consequences of funding a program, nor does it direct the staff to routinely
18 Executive Summary
gather and present data describing the cost and benefits of various programs. Progress has been
made regarding instructions for using budget worksheets. Instructions were included in the draft
budget manual and principals reported that they were adequate.
In Summary
The review of Pupil Achievement included the assessment of 30 selected professional and le-
gal standards of performance. Of the 30 standards, 30 were partially implemented with ratings
between one and seven.
The average rating of the subset of 30 standards in this operational area in September 2003 was
2.47 on a scale of 1 to 10 with 10 the highest score possible. The average rating in March 2004
was 3.40 and the average rating in September 2004 is 4.20.
FINANCIAL MANAGEMENT
The district continues to face several issues that make fiscal recovery challenging. Overall prog-
ress in implementing the recommendations of the Assessment and Improvement Plan is mixed.
Some areas, such as the development of policies and procedures, are beginning to show progress.
However, in other areas such as the establishment of a fully implemented, integrated, and accu-
rate position control system that provides the district with tight control over personnel costs, the
district has not made substantial progress.
The issues of greatest concern for the district are the structural deficit and reducing expenditures
to the level that revenues will support. The district appears to have reduced but not eliminated the
operating deficit. A significant portion of the reduction results from the shifting of general fund
expenditures to categorical programs. While the effective utilization of categorical funds would
constitute significant progress for the district, the district needs to exercise caution that those
categorical funds are being used appropriately and supported by adequate documentation. Also,
to the extent that general fund expenditures were covered by categorical carryover/fund balances,
those were one-time funds that will not be available to support the expenditures in future years.
The deficit continues to be exacerbated by the district’s decrease in enrollment, which shows no
evidence of abating. The enrollment decline by itself requires the district to reduce expenditures
every year in order to prevent the structural deficit from increasing.
Other questions related to the operating deficit that have not yet been resolved include the fol-
lowing:
• Can the district afford to continue to operate the large number of school sites, given its
declining enrollment?
• Has the district reduced staffing to a level that its revenues can support?
• Will the district be granted a waiver for special education maintenance of effort
(MOE)?
• Can the district successfully implement results-based budgeting, which poses signifi-
cant challenges in the areas of budget development and monitoring?
The district’s pending fiscal recovery plan will be integral to addressing the underlying issues
and bringing fiscal stability. Ultimately, the district should develop a realistic multiyear plan to
eliminate its structural operating deficit and repay its state loan.
Executive Summary 19
Since the FCMAT review in September 2003, the district has achieved some measure of stability
in daily operations, but turnover in senior fiscal management and supervisory staff and the loss
of the FCMAT on-site advisors has slowed further progress. The district recently filled the vacant
supervisory and management positions. However, while the new managers appear capable and
knowledgeable about school finance, the mere transition imparts a learning curve for both the
remaining staff as well as the new management employees. This hampers the district’s efforts to
address the assessment plan and recommendations aggressively.
Improvement was noted in several areas:
• The district has been revising its board policies and administrative regulations. While
this process is not complete, significant progress has been made.
• The district has completed drafts of policies and procedural manuals for the business
and accounting staff. These items have not been implemented yet, but the writing of
these items is essentially completed. Once reviewed, the district will need to distribute
the manuals and provide staff training.
• The district is implementing a new student attendance and information system, which
is scheduled to be in place for the 2005-06 year.
• The district has reduced nonpublic school costs for the special education program.
Budget Development and Monitoring
The district’s budget development process is now more actively managed by the Budget and
Finance departments. The oversight provided by the management staff provides for some level
of critical review and evaluation of budget information and assumptions. Therefore, the district’s
budget should be more accurate. A comparison of budget to actual revenues and expenditures could
not be made because the district had not closed its books at the time of the review. However, the
district’s third interim report did show a significant level of variance between the original budget
and projected amounts. After the books are closed, the district should evaluate the differences in
order to identify opportunities to more accurately determine budget revenues and expenditures.
The district is in the process of formally establishing policies and procedures. Nevertheless,
the quality of the budget and budget process is still heavily dependent on the knowledge and
involvement of the senior administrators. Further complicating this process is the transition to
results-based budgeting, which decentralizes a significant portion of the budget development
process. This change makes the budget development process more difficult to manage as the
necessary infrastructure and systems have not been put into place. Site budgeting, particularly for
positions, is currently performed outside of the financial, human resources, and position control
systems. This increases the workload for budget analysts and also increases the potential for
errors. Therefore, the district needs strong policies, procedures, and systems to ensure that the
budget is accurate, meets standards, and sustains any progress made.
The district still has not fully implemented position control, which compromises its ability to
monitor and control personnel expenditures. The district is also precluded from utilizing many
system functions, such as position budgeting, for budget development. The new human resourc-
es/payroll module needs to have documentation developed, additional staff training provided,
seniority and credential information loaded, and the automated substitute calling system estab-
lished.
20 Executive Summary
In the area of special education, the district is still trying to accurately identify all special edu-
cation FTEs/staff, the appropriate location of those positions, and the related costs. While the
district is making efforts to reduce its special education encroachment, it nevertheless is still a
significant burden on the unrestricted general fund.
Accounting Policies, Procedures, and Controls
The district has made some progress in improving its accounting processes by:
Eliminating the accounts payable backlog
Completing monthly cash reconciliations
Reviewing cash flow monthly
Completing draft policies and procedures for most business functions
However, the implementation of the human resources/payroll system seems to have resulted in
more payroll errors. Further, errors related to yearend payroll have affected the district’s ability
to close its books.
While the staff’s technical skill and capacity appears to be improving, there is still a clear need
for capacity building and additional training. However, the district does not consistently evaluate
its employees to identify and address capacity and training issues.
Supervisory and management staff members still appear to be consumed with dealing with vari-
ous issues and emergencies that frequently arise. As a result, accounting staff are not closely
supervised, and their work is not reviewed on any meaningful basis. Until policies and proce-
dures are in place, training has been provided, systems improved, and staff’s technical capacity
increased, close monitoring, supervision, and review by the accounting supervisors and managers
is critical in order to ensure the timely and accurate recording and reporting of financial transac-
tions. Such supervision, review, and oversight are not occurring. In addition, the district still has
not established an internal audit function, which would provide an additional source of review
and monitoring.
Management Information Systems
The district has made some progress in the area of management information systems, having
previously converted to a new financial management system. In addition, in January 2004, the
district implemented the human resources/payroll module of its information management system.
However, the district is not utilizing all of the system capabilities, and in some instances, controls
have not been implemented or are being overridden.
The district has not fully implemented and does not consistently utilize position control, has not
developed documentation and implemented security controls, has not yet loaded critical informa-
tion related to seniority and credentialing onto the system, nor has it implemented the automated
substitute calling system. While some progress has been made, the district needs to significantly
improve in the areas of budget development and control over personnel expenditures.
With regard to the student attendance and information system, the district is moving forward
with plans to implement a new system for the 2005-06 year. However, for 2004-05, the district
will continue to operate with an outdated version of the SASI system. The older version is not
able to accommodate the recording and reporting of information for more than 99 school sites,
Executive Summary 21
but the district operates more than 112 sites. As a result, the district must combine the data of
some sites and then separate it again to be able to report accurately. The need to manipulate the
data increases the likelihood of errors in recording and reporting attendance data.
Special Education
The district has historically operated with a significant deficit in its special education program.
Currently, the district is attempting to better control costs though measures such as reducing
NPS/NPA placements, controlling staffing ratios and the number of staff, recouping costs for LCI
and charter school students, and improving the intervention and assessment processes. Neverthe-
less, the district continues to operate with a large deficit in the current fiscal year.
The district is in the difficult position of reducing its special education general fund encroach-
ment, without violating federal maintenance-of-effort requirements which could result in the
district losing federal funds and further increasing the general fund encroachment.
In Summary
The review of Financial Management included the assessment of 30 selected professional and
legal standards of performance. Of the 30 standards, 29 are partially implemented and one stan-
dard is not yet implemented.
The average rating of the subset of 30 standards in this operational area in September 2003 was
0.73 on a scale of 1 to 10 with 10 the highest score possible. The average rating in March 2004
was 2.00 and the average rating in September 2004 is 2.83.
22 Executive Summary
FACILITIES MANAGEMENT
The Facilities Management and Planning Division continues to take steps to address the recov-
ery plan’s recommendations. The division has made steady progress since the last review period.
The division is implementing most of the FCMAT facilities standards, but has not yet reached
the stage in which the recommended practices are fully implemented, monitored, and becoming
systematic. In several areas, including preventative and planned program maintenance, standard-
ization of procedures is delayed by the lack of a documented approach and plan.
The Oakland Unified School District is implementing several new and innovative districtwide
initiatives, including a transition to small autonomous schools and a site-based budgeting ap-
proach known as results-based budgeting. Because these two projects are relatively new, it re-
mains difficult to fully understand how they will affect the work of the Facilities Division in the
future. Converting the district’s large schools to smaller campus units is a multiyear effort that
will affect the prioritization and workload of the Facilities Department’s construction projects.
Under results-based budgeting, custodians are managed by site administrators, and there is some
discussion of moving toward a similar site charge-back system for maintenance work. The lead-
ership and staff of the Facilities Division will have to continue to adjust its traditional approach
under these new conditions.
Graffiti and Vandalism
Graffiti and vandalism continue to be significant, costly, and demoralizing problems for the
district. The district has made little progress in addressing this issue in the year since these
reviews began. While some steps have been taken, including making graffiti removal a priority
for painting crews and custodians, the district continues to emphasize reactive measures rather
than preventative strategies. A large percentage of the graffiti and vandalism incidents take place
inside district buildings during school hours, and could therefore be prevented by improved
supervision. The Department of Buildings and Grounds estimates that more than 50 percent of its
routine work orders are directly related to vandalism and/or misuse of the district’s facilities.
Maintenance
The Facilities Division is doing reasonably well at keeping up with most of the district’s main-
tenance needs, but it is unreasonable to expect that the Facilities Division staff alone can make
the district’s buildings clean, safe, and productive learning environments. Combating the chal-
lenge of graffiti and vandalism must become a districtwide responsibility and requires leadership
from those with the authority to elicit active participation from principals, custodians, teachers,
students, parents, and community members. The district staff must work together to develop a
comprehensive graffiti and vandalism abatement plan that outlines procedures, consequences,
and specific responsibilities for all involved parties.
Comprehensive Facilities Master Plan
The district has made some efforts to update its Facilities Master Plan, but it needs to accelerate
action in this area. In the absence of an up-to-date plan, the district lacks a blueprint for guiding
facilities-related decisions. The district has contracted with a consultant who is close to complet-
ing a needs assessment of all the district’s sites. The final scope of the plan is still in question,
however, and different factions within the district and community have varying ideas as to what
the plan should contain. Regardless of the outcome of these discussions, it is vital that the plan
Executive Summary 23
encompass guidelines for prioritizing and approving projects. This plan component is essential to
ensuring that future projects are scheduled and undertaken in an appropriate and equitable man-
ner. Determining and documenting these prioritization criteria should be of primary importance
to the master planning team. Furthermore, the district must reestablish an active citizen’s over-
sight committee to provide input on bond expenditures and the master planning process.
Custodial Services
The Facilities Division has made the most notable improvements in the area of custodial ser-
vices. At the time of the last review, the Custodial Services Department had just undergone a
severe reduction in staffing levels, morale was extremely low, and unacceptable conditions were
observed in many of the district’s buildings. The department has responded proactively. Several
new activities are planned for this fall. These include piloting a team cleaning approach; dis-
tributing and utilizing newly purchased equipment; starting a comprehensive training program;
improving monitoring procedures and increasing consequences for poor attendance; emphasizing
expectations for restroom inspections and cleanliness; and reinforcing custodial cleaning stan-
dards. It remains to be seen how successful these efforts will be at improving school cleanliness,
but the plans are well developed and focused on improvement. The Custodial Services Depart-
ment and Facilities Division are optimistic that they will allow custodians to be more effective
and efficient at maintaining clean facilities, even as they undertake their work with fewer re-
sources than in previous years.
School Grounds
In addition to the efforts relating to custodial services, the Facilities Division has targeted im-
provement of school grounds as a primary area of focus. It purchased approximately $300,000
of new equipment and supplies, reorganized the gardener shop, and restructured its approach to
grounds maintenance. Grounds crews will visit schools as a coordinated team to address a par-
ticular site’s mowing and gardening needs on the same day. The review team observed improved
grounds’ conditions at many schools across the district.
While the division has yet to implement a systematic process for conducting regular, compre-
hensive building inspections, the Department of Buildings and Grounds has addressed most of
the issues raised by the Oakland Fire Department in its spring 2004 inspections. The division has
acquired the services of an external consultant and is working site-by-site to ensure that every
school has a functioning fire alarm system. Fire safety remains a significant issue at campuses
where vandalism has disabled or caused the removal of fire alarm pulls and extinguishers.
In Summary
The review of Facilities Management included the assessment of 24 selected professional and
legal standards of performance. Of the 24 standards, 24 are partially implemented with ratings
between one and seven.
The average rating of the subset of 24 standards in this operational area in September 2003 was
1.46 on a scale of 1 to 10 with 10 the highest score possible. The average rating in March 2004
was 2.96 and the average rating in September 2004 is 3.58.
24 Executive Summary
Returning the District to Local Governance
Several conditions need to be met for the district’s eventual return to local governance. Sen-
ate Bill 39, Perata, Statutes of 2003, provides clarity, conditions and intent regarding the return
of the designated legal rights, duties and powers to the Governing Board. The authority of the
Superintendent of Public Instruction (SPI) and his administrator designee shall continue until the
SPI determines that the conditions of subdivision (e) of SB 39 are satisfied. The Superintendent
of Public Instruction has sole authority to decide when the return of legal rights, duties and pow-
ers to the Governing Board occurs.
SB 39 provides specific and direct responsibilities to FCMAT in assisting the Superintendent of
Public Instruction and the Oakland Unified School District with recovery. These duties include
the following:
1. FCMAT shall prepare an improvement plan for the Oakland Unified School District by
updating the January 2000 comprehensive assessments and recovery plans of the district.
2. Based upon the progress reports, FCMAT shall recommend to the Superintendent of Public
Instruction those designated functional areas of school district operation that it determines
are appropriate for the Governing Board of the school district to assume.
3. FCMAT shall file written status reports that reflect the progress the district is making in
meeting the recommendations of the improvement plans.
4. FCMAT, after consultation with the state administrator, determines that for at least the im-
mediately previous six months the district made substantial and sustained progress in the
following functional areas:
1. Community Relations and Governance
2. Pupil Achievement
3. Financial Management
4. Personnel Procedures
5. Facilities Management
As required by SB 39, FCMAT updated the ratings of all of the standards assessed in the Oak-
land Unified School District Assessment and Recovery Plan developed for the district in January
2000. The Assessment and Recovery Plan Update completed in September 2003 provided the
updated ratings for all of the standards and also included the assessment of several additional
standards that became applicable subsequent to the initial assessment conducted in 2000.
The September 2003 Recovery Plan Update also identified criteria and provided an implementa-
tion plan, based upon a smaller subset of standards, for the district’s recovery. FCMAT selected
the subset of standards to be targeted for the ongoing six-month progress reports in consulta-
tion with the California Department of Education (CDE) and the appointed State Administrator.
The standards were selected as having the most probability to assist the district with recovery.
The selected standards are identified in the Tables of Standards in Section Two of this report. A
descriptive narrative of the progress made in addressing the recommendations of each of the
selected standards is also provided in Section Two of this report.
The September 2003 Recovery Plan Update reported updated scaled scores for all of the stan-
dards to provide an accurate measure of the district’s status regarding recovery at that time. Each
standard was measured for completeness and a relative scaled score from zero (not met) to ten
(fully met) was applied. An average of the scores of the selected subset of standards in each
Executive Summary 25
operational area was determined. The averages of the scaled scores reported in September 2003
became the baseline of data against which the district’s progress could be measured over time.
Six-month progress reports issued in March 2004 and September 2004 indicated the district’s
progress in addressing recommendations to successfully implement the identified subset of stan-
dards. New ratings of the district’s progress in the six-month intervals were provided.
The Oakland Unified School District is not required to reach a scaled score of 10 in every se-
lected standard, but the district is expected to make steady progress that can be sustained, as
substantial and sustained progress is a requirement of SB 39. It is reasonable to expect that the
district can reach an average rating of at least a six in each of the five operational areas identi-
fied in SB 39. In collaboration with the California Department of Education, FCMAT established
the following criteria to measure the district’s progress. When the average score of the subset
of standards in a functional area reaches a level of six, and it is considered to be substantial and
sustainable, and no individual standard in the subset is below a four, FCMAT will recommend to
the Superintendent of Public Instruction that this particular condition of SB 39 has been met and
that this operational area could be returned to the Governing Board. The final authority to return
governance authority to the district board lies with the Superintendent of Public Instruction.
Senate Bill 39 suggests an incremental return of powers to the district. Subject to progress,
recommendations every six months will address the functional areas of school district operations
that could be returned to the Governing Board of the school district by the SPI. The ultimate
return of legal rights, duties and powers is based upon the SPI’s concurrence with the assessment
of his administrator designee and FCMAT that the future compliance by the district with the im-
provement plans and the multiyear financial recovery plan is probable.
26 Executive Summary
Implementation Plan
FCMAT updated and assessed 416 professional and legal standards for the September 30, 2003
Recovery Plan Update, providing an in-depth review of 138 of these standards in five operational
areas. Based on this work, a subset of standards in each operational area was identified to assist
the district in successfully achieving recovery and return to local governance. This subset of stan-
dards has become the focus of the ongoing six-month progress reviews conducted in the district.
Although all professional and legal standards utilized in the comprehensive assessment process
are important to any district’s success, focusing on this identified subset of standards will enable
the Oakland Unified School District to more quickly achieve a return to local governance.
FCMAT, with the collaboration of the California Department of Education and the State Admin-
istrator, identified the following subset of 135 standards in the five operational areas that will be
reviewed during each six-month progress review.
26 standards in Community Relations and Governance
25 standards in Personnel Management
30 standards in Pupil Achievement
30 standards in Financial Management
24 standards in Facilities Management
These standards are addressed in-depth in each of the five operational areas in Section Two of
this report. They are also identified in bold print in the Table of Standards displayed at the end of
each operational area section.
In collaboration with the California Department of Education, FCMAT established the following
criteria to measure the district’s progress. When the average score of the subset of standards in
an operational area reaches a level of six and it is considered to be substantial and sustainable,
and no individual standard in the subset is below a four, FCMAT will recommend to the Super-
intendent of Public Instruction (SPI) that this particular condition of SB 39 has been met and that
this operational area could be returned to the Governing Board.
Subject to progress, recommendations every six months will address the functional areas of
school district operations that could be returned to the Governing Board of the school district on
an incremental basis. The ultimate return of legal rights, duties and powers will be based upon
the SPI’s concurrence with the assessment of his administrator designee and FCMAT that the fu-
ture compliance by the district with the improvement plans and the multiyear financial recovery
plan is probable.
September 30, 2003 Report:
The average of the subset of standards in each operational area as of the September 30, 2003
report is indicated below. These ratings provided a base line of data against which the district’s
progress could be measured over each six-month period of review.
Community Relations/Governance: average rating 3.92, with 6 standards under a 4.
Personnel Management: average rating 2.64, with 15 standards under a 4.
Pupil Achievement: average rating 2.47, with 25 standards under a 4.
Financial Management: average rating 0.73, with 29 standards under a 4.
Facilities Management: average rating 1.46, with 23 standards under a 4.
Executive Summary 27
March 30, 2004 Report:
The average of the subset of standards in each operational area as of the March 30, 2004 report
is indicated below. These averages can be compared to the baseline averages reported in the
September 30, 2003 report to determine the progress made by the district in the six months since
the previous report.
Community Relations/Governance: average rating 4.54, with 3 standards under a 4.
Personnel Management: average rating 2.80, with 15 standards under a 4.
Pupil Achievement: average rating 3.40, with 17 standards under a 4.
Financial Management: average rating 2.00, with 29 standards under a 4.
Facilities Management: average rating 2.96, with 17 standards under a 4.
September 30, 2004 Report:
The average of the subset of standards in each operational area as of this September 30, 2004 re-
port is indicated below. These averages can be compared to the averages reported in the previous
reports to determine the progress made by the district in the six-month intervals.
Community Relations/Governance: average rating 5.73, with 1 standard under a 4.
Personnel Management: average rating 3.96, with 9 standards under a 4.
Pupil Achievement: average rating 4.20, with 6 standards under a 4.
Financial Management: average rating 2.83, with 25 standards under a 4.
Facilities Management: average rating 3.58, with 10 standards under a 4.
The district continues to make modest progress in all five operational areas.
Average Average Average Stnds Stnds Stnds
Rating Rating Rating < 4 < 4 < 4
Operational Area
Sept. March Sept. Sept. March Sept.
2003 2004 2004 2003 2004 2004
Community Relations
3.92 4.54 5.73 6 3 1
and Governance
Personnel Management 2.64 2.80 3.96 15 15 9
Pupil Achievement 2.47 3.40 4.20 25 17 6
Financial Management 0.73 2.00 2.83 29 29 25
Facilities Management 1.46 2.96 3.58 23 17 10
Continuing Assessment Reports
Although Senate Bill 39 required FCMAT to conduct ongoing monitoring reports only through
September 2004, the California Department of Education plans for FCMAT to continue to moni-
tor the district’s progress for the district’s eventual return to local governance. Funding for a sub-
sequent annual assessment is proposed in Assembly Bill 2525, now enrolled for the Governor’s
consideration and anticipated signature.
28 Executive Summary
Background of FCMAT’s Involvement in the District
The information presented here chronologically summarizes FCMAT’s involvement with the
Oakland Unified School District beginning in spring1999.
Oakland USD Assessment and Recovery Plan, January 31, 2000
On April 14, 1999 the Oakland Unified School District Board of Directors voted unanimously to
ask for a comprehensive audit from the Fiscal Crisis and Management Assistance Team. The vote
was contingent upon Senator Don Perata acquiring funds from the state legislature to conduct
the study. Assembly Bill 1115 allocated $750,000 to FCMAT to conduct the comprehensive
assessment for the district in five major operational areas.
FCMAT utilized a Request for Applications (RFA) process to identify competent agencies in
California to assist with the comprehensive assessment. The agencies selected to assist in the
process were:
• California School Boards Association (CSBA) – Community Relations and Governance
• Schromm and Associates – Personnel Management
• California Curriculum Management Audit Center (CCMAC), an affiliate of the
Association of California School Administrators (ACSA) – Pupil Achievement (CCMAC
is now Curriculum Management Systems, Inc.)
• School Services of California – Financial Management
• MGT of America – Facilities Management
After months of field work in the district, the FCMAT comprehensive assessment was presented
to the district on January 31, 2000 under title Oakland Unified School District Assessment and
Recovery Plans. The report provided an assessment of 379 professional and legal standards in
five operational areas, and rated each standard on a scale of 1 (not implemented) to 10 (fully
implemented, sustained) as to their relative status of completeness.
Neither the Oakland Board of Directors nor Assembly Bill 1115 requested or required any
subsequent monitoring of the district’s work to implement the recommendations contained in the
Assessment and Recovery Plan. However, in the report FCMAT identified several key standards
in each operational area that the district should focus on during the first six months following the
presentation of the report.
Follow-Up Report for Oakland Unified School District, March 9, 2000
On March 9, 2000 FCMAT provided the Oakland Unified Superintendent with a follow-up report
on several areas of district operations. This report, in the form of a management letter, was sent
as FCMAT was concerned about the district’s ability to fund multiyear agreements. This follow-
up report addressed several fiscal and operational issues and made several recommendations for
improvement, including the following: the need for the district to decrease staff when enrollment
decreases; reconcile payroll records to position control records; begin to address the 2000-01
budget shortfall that would occur if reductions were not made; prepare multiyear financial pro-
jections relative to any district negotiated bargaining agreements; adopt a consistent method of
reporting charter school enrollment; monitor student attendance systems; monitor the budget to
actual expenditures on a regular basis.
Executive Summary 29
Oakland Unified SELPA Review, September 13, 2000
In March 2000 FCMAT was invited by the Oakland Unified School District Superintendent to
conduct a review and analysis of the district’s special education programs, services and admin-
istrative support structure. The review included the areas of the budget, staffing levels, programs
offered, student population, student performance and achievement, program compliance, student
discipline, and facilities. The district further requested that FCMAT focus on the additional areas
of the management information systems, transportation, non-public school placement (NPS),
student assessment and student study teams, teacher recruitment and support, certificated staff
credential status, class size and caseload, 504 accommodation, revenue maximization, service
delivery structure, and administrative support structure.
The Management Assistance SELPA Review for the Oakland USD was provided to the district
on September 13, 2000. The report noted that the district had numerous unresolved compliance
issues and that 30 percent of students had overdue IEPs or triennial assessments. The special
education program encroached significantly on the district’s general operating fund, far exceed-
ing the statewide average, and strategies to contain costs had not been implemented. The district
was making significant expenditures in the area of nonpublic school placements.
FCMAT was not requested to provide additional assistance or to conduct any follow-up reviews
of the district’s efforts to implement the recommendations in the special education SELPA re-
view.
Alameda COE Appointed Fiscal Advisor
In October 2002, the Alameda County Superintendent of Schools requested FCMAT to provide
management assistance to the Oakland Unified School District. On October 11, 2002, the county
office disapproved the district’s 2002-03 budget, declared a “lack of going concern” and appoint-
ed FCMAT as the county office’s fiscal advisor to the district.
The County Superintendent also requested the FCMAT Board of Directors to declare that a fis-
cal emergency existed in the district under Education Code Section 42127.8(e). On October 20,
2002, the FCMAT Board, after hearing testimony on the district’s fiscal condition took action de-
claring that a fiscal emergency existed in the Oakland Unified School District. This action by the
FCMAT board allowed FCMAT to direct its resources to assist the district and enabled FCMAT
to assign fiscal and technology staff to provide hands-on assistance to district personnel in the
business office and with the district’s data-management systems. The district was unable to close
its books for the 2001-02 fiscal year. Working daily in the district, FCMAT ultimately assisted
the district in closing the 2001-02 fiscal books and developing the budget for fiscal year 2002-03.
FCMAT also subsequently assisted the district in developing the 2003-04 budget.
The district’s ending fund balance for 2001-02 was a negative $31 million. FCMAT initially pro-
jected a negative ending fund balance for 2002-03 of more than $70 million including all of the
components of fund balance. The 2 percent reserve requirement for 2002-03 of approximately $8
million was not budgeted. FCMAT concluded that the district would require an emergency loan
to address the budget issues accumulated in the 2001-02 and 2002-03 fiscal years and expected
to continue into the 2003-04 fiscal year. FCMAT, the Alameda COE and the Oakland USD ulti-
mately determined that the district may need an emergency loan in the amount of $100 million.
30 Executive Summary
At a special board meeting on January 22, 2003, the Oakland Unified Board of Directors con-
sidered Board Resolution No. 0203-0143 requesting a state emergency loan in an amount to be
determined by FCMAT as the county appointed Fiscal Advisor. That resolution failed. Board
Resolution No. 0203-0140 providing for a state loan, the appointment of a State Trustee, and
other provisions, was subsequently passed by the board. On February 20, 2003 Senator Don
Perata requested the Oakland Unified Board of Directors to submit a formal request for a specific
loan amount by April 2, 2003 for inclusion in a bill that he would carry to the legislature. On
March 27, 2003 the Oakland Unified Board of Directors approved Board Resolution No. 0203-
0226 requesting a state emergency loan in the amount of $100 million.
State Administration of the Oakland USD
On May 30, 2003 the Governor signed Senate Bill 39 (Perata) into law. The bill appropriated
$100 million as an emergency loan to the Oakland Unified School District. The bill required the
Superintendent of Public Instruction to assume all the legal rights, duties and powers of the Gov-
erning Board of the Oakland Unified School District and to appoint an administrator to act on his
behalf in the school district.
The bill further required FCMAT to prepare an improvement plan for the school district by
updating the comprehensive Oakland Unified School District Assessment and Recovery Plan
developed by FCMAT for the district in January 2000, and to report on the implementation of the
improvement plan beginning in September 2003 and continuing with six-month progress reports
in March 2004 and September 2004.
A state administrator was appointed to the district effective June 16, 2004. The state administrator
requested fiscal assistance from FCMAT for the district’s finance department. Beginning July 1,
2003, one full-time equivalent staff member on loan from FCMAT, under the direction of the State
Administrator, provided on-site assistance and training for the finance department staff and served
as a senior fiscal manager for the district. This FCMAT on-site assistance ended on June 30, 2004.
July 1, 2003 Report to the Superintendent of Public Instruction
FCMAT prepared a report for the Superintendent of Public Instruction (SPI) on July 1, 2003 in-
dicating that the January 2000 Assessment and Recovery Plan developed for Oakland Unified re-
mained a viable plan of improvement, but that the professional and legal standards first assessed
in January 2000 needed to be “re-benched” in order to provide the new baseline data needed to
determine progress made by the district over time.
FCMAT’s general review of the Assessment and Recovery Plan indicated that the findings and recom-
mendations identified in January 2000 were still applicable to the district’s recovery. However, new
standards, not developed or included in January 2000, were now applicable to the district’s recovery
and needed to be included and assessed. Scaled scores assigned to standards in January 2000 were not
indicative of progress that may have occurred in the intervening years and were in need of revision.
FCMAT’s July 1, 2003 report to the SPI described the process FCMAT would employ to up-
date the January 2000 Assessment and Recovery Plan in the two months remaining before the
September 2003 deadline in the legislation. FCMAT successfully reconvened the study team
members who participated in the initial Assessment and Recovery Plan to assist with the ongoing
assessment of the district’s progress since that time. FCMAT study teams conducted their work in
the district during August and September 2003.
Executive Summary 31
Assessment and Recovery Plan Update, September 2003
Senate Bill 39 required that FCMAT prepare an improvement plan for the school district by
updating the comprehensive Oakland Unified School District Assessment and Recovery Plan
developed in January 2000. FCMAT was required to report on the implementation of the im-
provement plan beginning in September 2003 and continuing with six-month progress reports in
March 2004 and September 2004.
The Oakland USD Assessment and Recovery Plan Update, provided on September 30, 2003,
provided the Oakland Unified School District with the results of FCMAT’s systemic, comprehen-
sive assessment in five areas of district operations:
1. Community Relations and Governance
2. Personnel Management
3. Pupil Achievement
4. Financial Management
5. Facilities Management
The report reviewed all of the original standards assessed in the January 2000 report, added new
standards that had since become applicable, and provided current rating scores for each of the
standards. Several selected standards were reviewed in-depth and findings and recommendations
developed to provide guidance to the district for implementing the standards.
In collaboration with the California Department of Education and the State Administrator, FC-
MAT identified a subset of the professional and legal standards to address in follow-up six-month
progress reviews. These standards were identified to assist the district to focus on a fewer number
of standards with the most probability that, if addressed successfully, would lead to the district’s
recovery.
FCMAT’s updated assessment of the Oakland Unified School District indicated that the district
continued having difficulty meeting many of the basic legal and professional standards. The
report noted that many of the issues identified in the updated report could not be remedied in a
short period of time, and many of them would require collaboration with community and em-
ployee groups.
First Six-Month Progress Report, March 2004
In January and February 2004, FCMAT study teams conducted several visitations to the district
office and various school sites, reviewed documents, and interviewed district staff, advisory
board members, parents, students and community members to assess the district’s progress in ad-
dressing the recommendations of the Assessment and Recovery Plan.
A FCMAT representative also attended several community forums to solicit community input
first hand and to further explain FCMAT’s role in the district’s recovery process. A FCMAT rep-
resentative also participated in regular status meetings with the district, Alameda County Office
of Education, and the California Department of Education.
32 Executive Summary
Second Six-Month Progress Report, March 2004
In May, August and September 2004, FCMAT study teams visited the district and various school
sites, reviewed documents prepared by the district staff, interviewed district staff, advisory board
members, parents, students and community members to assess the district’s progress in address-
ing the recommendations of the identified subset of standards in the Assessment and Recovery
Plan in the six-month period since the March 2004 report.
This report is the second of the two six-month progress reports required by Senate Bill 39.
Executive Summary 33
34 Executive Summary
Section Two
Subset of 135 Standards in the
Five Operational Areas
Executive Summary 35
36 Executive Summary