FCMAT
Walnut Creek Elementary School District Report
organizational, and special education department and program review
Read the report at Walnut Creek Elementary School District ↗
Walnut Creek Elementary
School District
Special Education
and Central Office
Organizational Review
January 4, 2010
Joel D. Montero
Chief Executive Officer
Fiscal Crisis & Management Assistance Team
January 4, 2010
Patricia A. Wool, Ed.D., Superintendent
Walnut Creek School District
960 Ygnacio Valley Road
Walnut Creek, Ca 94597
Dear Superintendent Wool:
In April 2009, the Fiscal Crisis and Management Assistance Team (FCMAT) entered into
an agreement with the Walnut Creek Elementary School District for a review that required
FCMAT to perform the following:
1) Special Education Review: Due to state budget reductions and increasing operat-
ing costs, the district’s encroachment from the unrestricted general fund continues
to increase each fiscal year. The district requests that the FCMAT team conduct
a comprehensive review of the special education department and delivery meth-
odologies with recommendations to reduce the encroachment while meeting the
maintenance of effort requirements. The team will provide recommendations, that
if implemented will enable the district to serve students in a more cost efficient
manner.
A.) Evaluate the effectiveness of the assignment process for certificated staff
and classroom aides including class size ratios and provide recommenda-
tions, if needed.
B.) Review the department’s implementation of the Response to Intervention
Model (RTI) and provide recommendations, if any.
2.) Organizational Review -Central Office: The district requests staffing comparisons
be made for the central office including the Superintendent, Business and
Personnel departments. The district requests that staffing comparisons be made to
evaluate and ensure effective clerical, program, functionality and administrative
support are in alignment with districts of comparable size and structure. The team
will make comparisons of six similar size elementary districts by utilizing the Ed
Data website or six specific districts selected by the district.
FCMAT
Joel D. Montero, Chief Executive Officer
. .
1300 17th Street - CITY CENTRE, Bakersfield, CA 93
.
301-4533 Telephone 661-6
.
36-4611 Fax 661-63
.
6-4647
422 Petaluma Blvd North, Suite. C, Petaluma, CA 94952 Telephone: 707-775-2850 Fax: 707-775-2854 www.fcmat.org
Administrative Agent: Christine L. Frazier - Office of Kern County Superintendent of Schools
FCMAT visited the district to conduct fieldwork, interview staff, and review documents.
This report is the result of that effort.
Thank you for allowing us to serve you, and please give our regards to all the employees
of the Walnut Creek School District.
Sincerely,
Joel D. Montero
Chief Executive Officer
Fiscal Crisis & Management Assistance Team
TABLE OF CONTENTS i
Table of Contents
Foreword ...........................................................................iii
Introduction ...................................................................... 1
Executive Summary ......................................................... 3
Findings and Recommendations ................................... 5
General Fund Encroachment .........................................................................................................5
Certificated Staff and Classified Aides ..................................................................................15
Time Management ............................................................................................................................21
Organizational Review of the Central Office .....................................................................23
Appendices ......................................................................31
FOREWORD iii
Foreword - FCMAT Background
The Fiscal Crisis and Management Assistance Team (FCMAT) was created by legislation
in accordance with Assembly Bill 1200 in 1992 as a service to assist local educational
agencies (LEAs) in complying with fiscal accountability standards.
AB 1200 was established from a need to ensure that LEAs throughout California were
adequately prepared to meet and sustain their financial obligations. AB 1200 is also a statewide
plan for county offices of education and school districts to work together on a local level to
improve fiscal procedures and accountability standards. The legislation expanded the role of the
county office in monitoring school districts under certain fiscal constraints to ensure these dis-
tricts could meet their financial commitments on a multiyear basis. AB 2756 provides specific
responsibilities to FCMAT with regard to districts that have received emergency state loans.
These include comprehensive assessments in five major operational areas and periodic reports
that identify the district’s progress on the improvement plans.
In January 2006, SB 430 (charter schools) and AB 1366 (community colleges) became law and
expanded FCMAT’s services to those types of LEAs.
Since 1992, FCMAT has been engaged to perform nearly 750 reviews for local educational
agencies, including school districts, county offices of education, charter schools and community
colleges. Services range from fiscal crisis intervention to management review and assistance.
FCMAT also provides professional development training. The Kern County Superintendent of
Schools is the administrative agent for FCMAT. The agency is guided under the leadership of
Joel D. Montero, Chief Executive Officer, with funding derived through appropriations in the
state budget and a modest fee schedule for charges to requesting agencies.
Study Agreements by Fiscal Year
80
70
60
50
40
30
20
10
0
92/93 93/94 94/95 95/96 96/97 97/98 98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10
Projected
Total Number of Studies....................743
Total Number of Districts in CA ..........982
Management Assistance.............................705 (94.886%)
Fiscal Crisis/Emergency ................................38 (5.114%)
Note: Some districts had multiple studies.
Districts (7) that have received emergency loans from the state.
(Rev. 1/22/09)
Walnut Creek Elementary School District
seidutS
fo
rebmuN
Fiscal Crisis & Management Assistance Team
INTRODuCTION 1
Introduction
Background
The Walnut Creek Elementary School District is located in the Contra Costa County and
serves approximately 3,200 students enrolled in kindergarten through eighth grade. The
district operates five K-5 neighborhood elementary schools and one 6-8 intermediate
school. Grades K-5 are primarily self-contained, while the intermediate grades offer a
mixture of core and elective classes.
The district provides special education programs and support services for 325 students with
disabilities. Because of state budget reductions and increasing operating costs, the special
education program’s encroachment on the unrestricted general fund has increased each
fiscal year. The district’s goal is to decrease encroachment while continuing to meet the
maintenance-of-effort requirements in federal law and deliver quality services to students.
In October 2009, the district requested that FCMAT perform the following.
1) Special Education Review: Due to state budget reductions and increasing op-
erating costs, the district’s encroachment from the unrestricted general fund
continues to increase each fiscal year. The district requests that the FCMAT
team conduct a comprehensive review of the special education department and
delivery methodologies with recommendations to reduce the encroachment
while meeting the maintenance of effort requirements. The team will provide
recommendations, that if implemented will enable the district to serve stu-
dents in a more cost efficient manner.
A.) Evaluate the effectiveness of the assignment process for certificated
staff and classroom aides including class size ratios and provide rec-
ommendations, if needed.
B.) Review the department’s implementation of the Response to Interven-
tion Model (RTI) and provide recommendations, if any.
2.) Organizational Review -Central Office: The district requests staffing
comparisons be made for the central office including the Superintendent,
Business and Personnel departments. The district requests that staffing
comparisons be made to evaluate and ensure effective clerical, program,
functionality and administrative support are in alignment with districts of
comparable size and structure. The team will make comparisons of six similar
size elementary districts by utilizing the Ed Data website or six specific
districts selected by the district.
Walnut Creek Elementary School District
2 INTRODuCTION
Study Guidelines
FCMAT visited the district on November 2, 2009 to conduct interviews, collect data
and review documents. This report is the result of those activities and is divided into the
following sections:
I. Executive Summary
II. General Fund Encroachment
III. Certificated Staff and Classified Aides
IV. Time Management
V. Organizational Review of the Central Office
Study Team
The study team was composed of the following members:
William P. Gillaspie, Ed.D. Anne Stone
FCMAT Management Analyst Owner
Sacramento, CA Anne Stone Consultants
Mission Viejo, CA
Leonel Martínez
FCMAT Public Information Specialist Jack Lucas III*
Bakersfield, CA SELPA Director
Los Angeles County Office of Education
James “Sarge” Kennedy Los Angeles, Ca
FCMAT Consultant
Red Bluff, CA Terry L Manges
FCMAT Consultant
JoAnn Murphy Chula Vista, Ca
FCMAT Consultant
Santee, CA
*As a member of this study team, this consultant was not representing his employer but
was working solely as an independent contractor for FCMAT.
Fiscal Crisis & Management Assistance Team
ExECuTIvE SummARy 3
Executive Summary
Because of state budget reductions and increasing operating costs, encroachment on
the unrestricted general fund has continued to increase each fiscal year for the Walnut
Creek Elementary School District. From 2007-08 to 2008-09, encroachment increased by
$351,447 according to the 08-09 maintenance-of-effort document, and it is expected to
rise in the 2009-10 fiscal year.
According to the most recent data, the district placed only three of 358 special
education students or .8% in nonpublic schools well within the statewide average of
.8%. However, the district contracts with 15 nonpublic agencies (NPAs) to provide
services in occupational and physical therapy, speech therapy, psychology assessments,
nursing services, behavior support, assistive technology and bilingual assessments. In
the 2008-09 fiscal year, these services cost the district $391,786.35. Districts typically
use NPAs placement to provide mandated service when district staff cannot provide
similar services. NPAs usually cost approximately 30% more compared to using district
staff. Therefore, the district should continue to search for and hire professional service
providers as district staff members to eliminate the need for some NPA services and
reduce the overall cost of NPA services.
The district operates two types of regional programs under a cooperative arrangement
with two neighboring districts, but lacks specific information about the cost of program
operations. This critical data includes the cost of administering the program, facilities,
maintenance, materials etc. Without this critical information, the district cannot recoup
the costs of educating students from neighboring districts. Walnut Creek Elementary
also did not bill participating districts for the 2008-09 fiscal year, reducing its income
calculation and total revenue thereby increasing the general fund contribution for the
2008-09 fiscal year. The district indicated billing will be corrected this fiscal year for all
participating districts.
The district does not bill for either Medi-Cal Administrative Activities (MAA) or Medi-
Cal. This practice could produce significant additional resources to help fund speech
therapists, school psychologists, school nurses, instructional aides, and occupational
therapists. The district should review the eligibility process required to access these
reimbursements and contract with a consultant or county office to manage the Medi-Cal
billing services
The district is considering changing the job title for the resource specialist (RSP) to
instruction support provider (ISP). This change would eliminate the caseload restrictions
outlined in the Education Code and the legal requirement for instructional aides. This
modification also could reduce the encroachment from the general fund; however, there
is confusion among the special education staff about its purpose, the potential impact on
teacher caseloads, and the programmatic implications.
Walnut Creek Elementary School District
4 ExECuTIvE SummARy
The district does not use a formal evaluation to determine the necessity of one-to-
one instructional aides. The district also does not incorporate the use of transition or
“fading” strategies to promote student independence or provide the necessary support
and create opportunities and time lines to decrease the need for one-to-one support from
instructional aides. A formal evaluation process for one-to-one aides is available through
the Contra Costa SELPA.
The Response to Instruction and Intervention Model is not being systematically
implemented, and the Student Study Team (SST) process is fragmented and inconsistent
in comparison to best practices. This can lead to overidentification of students for special
education and increase the fiscal impact on the general fund.
Because of the state’s fiscal crisis, the district significantly reduced the number of support
staff members in the central office. The district maintains a full-time director of special
services who performs a number of duties in addition to special education. The position’s
special education oversight duties consume a large percentage of time, resulting in limited
support for other important areas.
FCMAT compared staffing in the Superintendent, Business and Personnel departments
with those of other K-8 elementary school districts in the region. This comparison
found that other districts employ an average of 4.05 administrators while Walnut Creek
Elementary employs only three full time equivalent (FTE) administrative positions. The
average teacher\student staffing ratio in comparable districts is .0029 while the average
for Walnut Creek Elementary is .0030.
The district office staffing level is lower than comparison districts. This is achieved by
offsetting a high level of high classified staffing positions with administrative staffing that
is lower than comparison districts.
Fiscal Crisis & Management Assistance Team
gENERAL FuND ENCROAChmENT 5
Findings and Recommendations
General Fund Encroachment
Because of state budget reductions and increasing operating costs, encroachment on
the unrestricted general fund has continued to increase each fiscal year for the Walnut
Creek Elementary School District. While special-education spending continues to grow
statewide, funding has not kept pace, forcing school districts to “encroach” on general-
education revenues to pay the full costs of special education programs. From the 2007-
08 fiscal year to 2008-09, encroachment on the unrestricted general fund increased by
$351,447 according to the 2008-09 maintenance-of-effort document, and it is expected
to rise again in the 2009-10 fiscal year. The district’s goal is to decrease encroachment
on the unrestricted general fund while continuing to meet maintenance-of-effort
requirements and delivering high-quality educational services to its students.
In addition to classified and certificated salaries and benefit compensation, several factors
significantly affect the special education budget. FCMAT reviewed nonpublic schools and
agencies, due process and complaint costs including legal fees, county office programs
and regionalized programs. A review of special education budgets may help determine
whether there are opportunities to maximize revenue for the district.
In this study, the allocation from the Contra Costa Special Education Local Plan Area was
not reviewed because this is being accomplished through a separate FCMAT study of that
SELPA. Detailed information will be available following that review and will be provided
to the district under separate documentation. Other areas of income considered included
regionalized service billing, Medi-Cal Administrative Activities (MAA) and Medi-Cal.
Nonpublic Schools (NPS)
A nonpublic school is certified by the State Department of Education, nonsectarian,
and under contract with the district. The NPS provides the appropriate facilities, special
education, designated instruction and services required by the individual with exceptional
needs when no appropriate public education program is available (EC 56345).
In 2008-09, three Walnut Creek Elementary students were placed in a nonpublic school,
one student was placed in conjunction with Contra Costa Mental Health and the other
two students were placed in local nonpublic school programs. Three of the district’s 358
special education students, or .8%, were in a NPS program compared with the 2007-08
state average of 1% according to the most recent data available.
Walnut Creek Elementary School District
6 gENERAL FuND ENCROAChmENT
In 2009-2010 four district students are placed in a nonpublic school, two students
in conjunction with Contra Costa Mental Health. The total cost for NPS placements
increased from $177,610.15 in 2008-09 fiscal year to a projected $212,902.50 in the 2009-
10 fiscal year. This projected increase of $35,292.35 occurred because of the following
three factors:
• A late placement and therefore a partial-year billing occurred in 2008-09.
• One additional student was placed in the 2009-2010 fiscal year.
• Increases in NPS daily rates.
The district does not use the SELPA master contract for these placements, but utilizes the
SELPA’s negotiated rates and list of nonpublic schools to ensure the schools are certified.
Education Code 7572.5 (c) (1) indicates that when a placement is made in conjunction
with mental health, the placing agency functions as the lead case manager. The district is
therefore obligated to provide the educational portion of these placements.
One student enrolled in a nonpublic school was previously in a county office program,
and the other students were placed in district programs. The district developed behavior
plans for these students before referring them to a NPS, but did not complete a functional
analysis and behavior intervention plan.
The special education director is involved with each Individualized Education Plan
(IEP) for NPS students. However, the staff indicated that IEPs do not contain a specific
transition plan to return the students to a district program.
The SELPA has a process for districts to request reimbursement for NPS costs that
surpass a predetermined threshold. The district requested this reimbursement for
2008-09, receiving $4,385, and plans to request it for 2009-10 for a projected $5,394.
It is important to track costs and request reimbursement in a timely manner to ensure
continued access to these resources.
Recommendations
The district should:
1. Use the SELPA contract, certified list and negotiated rates for all NPS placements.
2. Ensure that a behavior intervention plan is completed and implemented before
referring a student to a NPS when appropriate.
3. Include in each IEP for a NPS student a specific transition plan to return the
student to a district program as soon as possible.
Fiscal Crisis & Management Assistance Team
gENERAL FuND ENCROAChmENT 7
4. Continue monitoring and billing for any SELPA reimbursement for a NPS
placement.
5. Determine whether the student could be served in a county office program before
placement in a NPS setting.
Nonpublic Agencies
A nonpublic agency is certified by the State Department of Education, nonsectarian, and
under contract with the district to provide the appropriate special education designated
instruction and services required by the individual with exceptional needs when no
appropriate public education program is available (EC 56345).
In the 2008-09 fiscal year Walnut Creek Elementary contracted with 15 nonpublic
agencies (NPAs) for a cost of $391,687.35. NPAs provided services in the areas of physical
therapy, speech, psychology assessments, nursing, occupational therapy, behavior support,
assistive technology, and bilingual assessments.
In the 2009-2010 fiscal year, the district has contracts with eight NPAs for a cost of
$255,153.85 or $136,533.50 less than last year. The district still contracts for occupational
therapy services, physical therapy, behavior assessments/support, assistive technology and
a nurse. As with nonpublic schools, it is impossible to anticipate whether these costs will
increase or decrease during the school year.
Five of the eight district contracts with NPAs are for $8,000 or less, and it is unlikely that
the district could provide these services for less.
The district contracts with a NPA for physical therapy services for 13 students at a cost of
$38,653. Several of the students receive this therapy in a county office program.
Sixty students receive occupational therapy through an NPA at a cost of $138,060. The
district is trying to hire a full-time occupational therapist. Based on the district salary
schedule, hiring one full-time occupational therapist would result in a cost savings of
approximately $60,000 per year.
The district does not employ a certified occupational therapy assistant (COTA) to work in
conjunction with the part-time district occupational therapist. A COTA cannot perform
assessments, but can provide IEP-required therapeutic sessions, enabling the occupational
therapist to have a larger caseload.
Walnut Creek Elementary School District
8 gENERAL FuND ENCROAChmENT
Recommendations
The district should:
1. Review each IEP that includes physical therapy to determine whether district/
county office staff members such as the adaptive physical education teacher (APE)
could implement the goals, reducing the cost of the contract.
2. Continue trying to hire a full time occupational therapist to replace the
occupational therapist contracted by the nonpublic agency.
3. Pursue hiring a COTA to provide the appropriate students with therapy. This
would enable students receiving services from the NPA occupational therapist to
receive them from the district occupational therapist, reducing the cost of the NPA
contract.
Due Process
The Individuals with Disabilities Education Act (IDEA) provides for mediation and due
process to resolve disputes related to educating children with disabilities. This ensures
that each child receives a Free and Appropriate Public Education (FAPE) tailored to his or
her unique needs (20 U.S.C. 1401 Section 300.507).
A complaint can be filed against the district with the Department of Education alleging
a violation of federal or state law or regulation relating to the provision of a FAPE (20
U.S.C. 300.507).
The district had no due process filings in 2008-09 but had two complaints filed this year.
An attorney was retained in 2008-09, but did not use all the hours in the contract, so
the number was reduced in the 2009-10 fiscal year for a savings of $13,875. A $28,543
settlement for legal fees occurred in the 2008-09 fiscal year.
The staff indicated Walnut Creek Elementary has fewer due process filings and
complaints and lower costs than other SELPA districts. The special education director
contacts the SELPA for consultation when needed, minimizing legal costs.
Recommendations
The district should:
1. Continue using the SELPA resources to contain litigation costs.
Fiscal Crisis & Management Assistance Team
gENERAL FuND ENCROAChmENT 9
County Office Programs
The district has 13 students in a program operated by the Contra Costa County Office
of Education this year and had 18 students in these programs in 2008-09. The cost per
student in a county office program was approximately $26,500 in the 2008-09 fiscal
year and is projected to be $27,500 in the 2009-10 fiscal year. The program cost includes
occupational therapy, speech, and adaptive physical education, but not physical therapy,
transportation, or additional aide support. If these related services are required, the
district is either billed (transportation and aide support) or contracts to provide the service
(physical therapy). The type of county office program does not affect the cost.
Students in County Office Programs by Grade and Eligibility
GRADE AUTISM EMOTIONAL MENTAL ORTHOPEDIC
DISTURBANCE RETARDATION IMPAIRMENT
Prekindergarten 1
1 1
2 1
3 1
4 1 2 1 1
5
6 2
7 1
8 1
Source :Contra Costa County program document
The above table shows that Walnut Creek Elementary lacks significant clusters of
students by age or eligibility and therefore could not develop cost-effective district
programs. Except for students who require more involved nursing services, the students
in county office programs tend to have more behavioral issues than the students in district
programs.
The students in the programs operated by the county office do not tend to return to a
district program according to staff members. They also indicated that transition plans are
not included in their IEPs. Before being referred to a county office program, one or more
students had a behavior support plan. However, none of the students had a full functional
analysis and behavior intervention plan.
Walnut Creek Elementary School District
10 gENERAL FuND ENCROAChmENT
Recommendations
The district should:
1. Review the IEP for each student in the county office programs to ensure that the
student’s goals cannot be implemented in a district program.
2. Develop a transition plan for students who can return to a district program.
3. Ensure that a functional analysis and behavior intervention plan are developed and
implemented when appropriate before referral to a county office program.
Regional Programs
The district operates two types of preschool programs, the Early Intervention Program
and the nonintensive program, and both include students from two neighboring districts.
The three districts developed a billing system for the different classes based on actual
costs at the time the program was developed.
The Early Intervention Intensive Program costs $52.01 per hour. The district director
calculates costs, submitting a bill to the student’s district of residence. However, another
district hires the tutors assigned to the program and bills Walnut Creek Elementary, which
bills the district at the hourly rate. If the tutors are not fully occupied in serving students,
Walnut Creek still pays for their time.
The nonintensive program cost was calculated using actual staff costs with an additional
factor of $10,000 to cover all other expenses. Students are enrolled in this program for
different amounts of time per week, but the billing occurs per year billing at $3,825 a
student.
Memorandums of understanding (MOUs) with the three districts have not been
renegotiated for the 2009-10 fiscal year to incorporate any changes in staff salaries or
other costs. Further the amount negotiated for the intensive program did not take into
account the cost of administering the program, facilities, maintenance, materials etc. The
amount negotiated for the nonintensive program excluded additional costs for operation,
and it is unclear what the figure actually included.
Without specific information regarding the costs of program operation, it impossible to
determine whether it is cost-effective to continue including out-of-district students in
these programs.
In addition to known costs, the district should consider the following two factors in
deciding whether to continue the current arrangement:
Fiscal Crisis & Management Assistance Team
gENERAL FuND ENCROAChmENT 11
• Could the district hire the tutors necessary for the intensive program?
• Would the district need the present program staffing?
Recommendations
The district should:
1. Complete an informal audit to determine the actual cost of operating the intensive
and nonintensive preschool programs that include students from neighboring
districts. In addition to staffing, all cost areas should be included such as the
following:
• Facilities
• Maintenance
• Utilities
• Administrative support from special education
• Business department support for billing
2. Determine in this audit whether the district could hire the tutors needed for the
intensive program.
3. Determine whether the current program staffing level would be necessary if out-
of-district students were excluded.
4. Following this audit, determine whether it is cost-effective for the program to
continue including out-of-district students and perform one of the following:
a. Renegotiate the MOUs for these programs to reflect actual costs or
b. Determine that is not cost effective and notify the districts of the change.
Other Factors
The following three other factors have also affected the special education budget.
• The district did not bill for students in the nonintensive program in the 2008-09
fiscal year. This resulted in a reduction in the income calculation that increased
the general fund contribution by a reported $180,000 last year. Billing is
accomplished through the SELPA and will be corrected this year.
• American Reinvestment and Recovery Act (ARRA) money for preschool
materials is included in this year’s budget. This amount is $158,000 more than was
included in last year’s budget and inflated the current budget.
Walnut Creek Elementary School District
12 gENERAL FuND ENCROAChmENT
• The district does not bill for MAA or Medi-Cal.
Medi-Cal Administrative Activities (MAA) and Medi-Cal
MAA
In 1995, the state developed the MAA program to provide a method of federal
reimbursement for health-related administrative activities performed by school districts
for at-risk children from newborn to 21 years of age. Payment is based on the cost of
providing eligible health-related outreach activities. The categories generally include the
following:
• Outreach/public awareness and information
• Facilitating Medi-Cal applications
• Referral, coordination, and monitoring of Medi-Cal services
• Transportation-related activities supporting Medi-Cal services
• Translation related to Medi-Cal services
• Program planning, development, and coordination related to Medi-Cal services
Examples of program staff that might perform MAA activities include the following:
• Special education staff
• School administrators
• Nurses, health clerks, health aides
• School psychologist, counselors
• Speech language pathologists
• Healthy start staff members
• Child development programs
• State preschool programs
MAA claims for federal reimbursement of activities are submitted quarterly based on a
weeklong time survey. MAA claims are based on a time study (personnel time allocated
to outreach activities); the Medi-Cal eligibility rate of the district’s entire student popula-
tion; the Federal Financial Participation (FFP) rate; and an analysis of the school’s finan-
cial records. Schools can receive a reimbursement of approximately 50%, and these funds
are unrestricted.
Medi-Cal
The purpose of the Local Education Agency (LEA) Program is to do the following:
Fiscal Crisis & Management Assistance Team
gENERAL FuND ENCROAChmENT 13
1. Provide comprehensive health service to eligible Medi-Cal students and their
families when applicable.
2. Allow districts to become Medi-Cal providers and bill the program for the health
services provided by the medical professionals they employ. These include speech
therapists, school psychologists, school nurses and occupational therapists and
aides assigned to students in the IEP.
3. Facilitate reinvestment in health and social services for students and their families.
Regulations governing the TCM Program are contained in the California Code of
Regulations, Title 22, Division 3, Chapter 3, Article 3, and Section 51271. Reimbursement
is based on a fee-for-service.
IEP/ Individualized Family Service Plan health, speech, psychological and physical
assessments may be billable as well as treatment services for health, speech, psychological
and physical therapy including occupational therapy. Transportation to these assessments
and services may also be billable.
Because of the complexities of this program, school districts often contract with another
entity to ensure that all Medi-Cal eligible students that are under an IEP/ IFSP are
accounted for and all billing requirements are fulfilled.
The district does not bill for MAA or Medi-Cal.
Recommendations
The district should:
1. Contact the county office to determine whether it provides assistance with MAA/
Medi-Cal billing.
2. Contact other districts in the SELPA to determine which participates in MAA and
Medi-Cal billing for these services and how they administer the programs.
3. Determine whether it would be fiscally beneficial for the district to participate in
these programs.
Walnut Creek Elementary School District
14 gENERAL FuND ENCROAChmENT
Fiscal Crisis & Management Assistance Team
CERTIFICATED STAFF AND CLASSIFIED AIDES 15
Certificated Staff and Classified Aides
Resource Specialists
The district recently changed the title of the resource specialist to that of instruction
support provider, aligning it with 11 other districts in the Contra Costa SELPA. This
modification eliminated caseload requirements, but did not result in changes to the
program or to the position’s job description. In addition, the title change prompted the
following issues:
• Some special education teachers were confused by this title change and others
were unaware of it. Many perceive it as the district’s attempt to bypass the
caseload limitation of 28 outlined in EC 56362 (6) (c).
• The change was never discussed with union representatives.
The FCMAT review found that the average caseload or student\teacher ratio for ISP
teachers is 25 to one. The district has not violated caseload restrictions; however, greater
openness is necessary for the certificated staff to fully understand the purpose of the
change, the potential caseloads and the programmatic implications.
The district manually develops Individualized Education Programs (IEPs) and lacks the capacity
to obtain data on program frequency and duration, particularly regarding caseloads for ISP and
Designated Instructional Services (DIS). This practice ultimately inflates caseload numbers.
A review of district procedures found that there are no exit criteria for the ISP (previously
RSP) program. As students prepare for transition to general education, transition goals
and time lines should be established in the IEP process.
In the previous model, each resource specialist was assigned with a full-time instructional
aide consistent with the requirements of EC Section 56362 (f), which states: “At least
80 percent of the resource specialists within a local plan shall be provided with an
instructional aide.” This was accomplished at a cost of $156,000. Since the resource
specialist designation has been eliminated, the district is not legally obligated provide
instructional aide support at the current level.
Special Day Class
The comparative data used to analyze special day class caseloads was developed by
School Services of California, Inc. School Services is a consulting firm for educational
agencies that provides financial information as well as widely accepted guidelines on appropriate
caseloads and class sizes.
District special day classes for the mildly to moderately disabled average 12 students
compared with the SSC range of 12 to 15. The middle school class enrollment is
17 students with one student scheduled to be added, and each class has a full-time
instructional aide. Two classes have an additional three hours of instructional aide time.
The district’s special day class enrollment for the moderately to severely disabled ranges
Walnut Creek Elementary School District
16 CERTIFICATED STAFF AND CLASSIFIED AIDES
from eight to 10 students, with 2.5 instructional aides. Both of these classes are staffed
consistent with SSC guidelines.
The newly formed special day class for autistic students in grades one through four
maintains a ratio of one adult to two students. The maximum class size is eight students,
which is consistent with SSC guideline. However, the classroom is staffed for eight
students and has only four enrolled. The district should monitor the class size and
temporarily reassign excess aide support until the class has the full number of students
enrolled.
Designated Instruction Services
The average caseload for speech and language specialists is 43. EC 56363.3 requires districts
to maintain a SELPA-wide average of 55. As a result, the district could reduce its speech
therapy services by .5 full-time equivalent (FTE) positions for a yearly savings of $32,323 and
still operate within the legal requirements of the California Education Code Part 30.
Staffing records indicate that .2 FTE of a speech and language specialist is used to work
with 15 general education students and three special education students. The funding
for this position could be moved to other categorical funding sources, and the remaining
three special education students could be reassigned to existing specialists. This would
reduce the special education budgets by $12, 529.
One-to-one Instructional Aides
The district does not have a formal evaluation to determine the necessity of one-to-
one aides. Instead, these types of decisions are made solely by the director of special
education. The SELPA has defined procedures for this area, but the district uses them
only occasionally.
School and district staff members indicated that strategies for students to transition from
the use of one-to-one aides are not incorporated into the IEP. This practice is important
because it promotes student independence, provides the necessary supports and creates
opportunities and time lines to decrease the dependency on one-to-one assistance.
The director of special education monitors the use of one-to-one aides through informal
observation. However, general and special education teachers indicated that the aides
assigned are sometimes unnecessary and their services are not always maximized.
Recommendations
The district should:
1. Provide clear direction to the staff regarding the possible change from RSP to ISP including
the rationale, the programmatic expectations, and the implications for caseloads.
Fiscal Crisis & Management Assistance Team
CERTIFICATED STAFF AND CLASSIFIED AIDES 17
2. Update job descriptions to reflect the change from RSP to ISP.
3. Review ISP caseloads for frequency and duration of services and determine the
caseload size appropriate for this program.
4. Consider using a computerized IEP system to help monitor services and caseloads.
5. Reevaluate the decision to provide six hour aides to the RSP at a cost of $156,000.
Under the ISP program design, the district is not legally required to provide aides
as it was with the RSP. Another option is for the district to explore using 3.5 hour
aides and eliminating the cost of benefits.
6. Communicate with the certificated union representation on the change in job clas-
sification for the RSP position.
7. Define the criteria for determining instructional aides and the increase in class-
room support above the normal staffing pattern. Is this related to the aides?
8. Redistribute some of the aide time in the autism class until the class size increas-
es.
9. Move the funding for the .2 speech therapist serving regular education students
to another categorical area to reduce the special education budget by $12,529 per
year.
10. Increase speech caseloads and reduce speech therapists by .5 FTE positions for
a savings of $31,323 per year. Another option is for the district to partner with a
neighbor district and share the salary and costs of the position.
11. Redesign the process for adding one-to-one aides and incorporate the use of SEL-
PA procedures.
12. Develop a monitoring process for the use of one-to-one aides, gathering input
from general education teachers and principals.
Response to Intervention Model
Response to Instruction and Intervention is a tiered system of instruction that integrates
resources from general education, categorical programs, and special education. On
November 14, 2008, the state Superintendent of Public Instruction issued the Core
Components of Response to Intervention as guidance to California schools, available at
the following Web site;
http://www.cde.ca.gov/sp/se/sr/documents/sldeligibltyrti2.pdf
Walnut Creek Elementary School District
18 CERTIFICATED STAFF AND CLASSIFIED AIDES
Response to Instruction and Intervention is not systemically implemented at Walnut
Creek Elementary. The district is working to expand Tier II in the long-term, but progress
is expected to be slow without a curriculum director. The sites lack some materials,
resources, and training necessary to operate a fully functioning program.
The district lacks the state-approved supplemental intervention programs that make up
a major component of the instructional system as part of the tiered model. There is no
indication that universal screening programs are used to screen students at least three
times per year in early literacy skills, which include phonological awareness, alphabetic
understanding, fluency, vocabulary, and comprehension. Universal screening programs
are important in assessing academic and behavioral performance and evaluating the
effectiveness of instruction.
The district staff has not received the training necessary to implement Response to
Instruction and Intervention, and there is no districtwide training module. The district
also lacks a system to collect and analyze data to measure learning rates and levels of
performance. The district staff indicated that school teams do not consistently record
baseline information.
General education should be the first intervention and should also take the lead in
implementing the instructional system.
The district’s student study team (SST) process is fragmented and inconsistent, with no
district wide guidelines implemented. School site staff members view the SST process as
a way of placing students in special education. Effective SSTs accomplish the following:
• Identify and assist students.
• Help teachers solve problems with students using the collective expertise of other
appropriate professionals.
• Help parents when they have concerns.
• Help students who request additional support.
• Improve communication between staff members and between the school and the
home.
• Increase staff commitment to students and to the educational program.
• Help facilitate referrals to the general education programs at a school site.
• Coordinate services a student receives.
• Attempt and to document all reasonable interventions before referring a student to
be assessed for special education eligibility.
• Document the use of scientific interventions and use of peer reviewed research.
• Explain the Response to Instruction and Intervention model if used and review
progress under this model.
Fiscal Crisis & Management Assistance Team
CERTIFICATED STAFF AND CLASSIFIED AIDES 19
Walnut Creek Elementary has higher identification and eligibility placement for special
education students than the SELPA. This could be partly because of the lack of a scientific
researched-based intervention model such as Response to Instruction and Intervention.
Students are assessed for special education before implementation of researched-based
interventions.
For fiscal purposes and identification rates, the Contra Costa SELPA uses the April
pupil count from the California Special Education Management Information System
(CASEMIS) for those who are newborn to age 22 and the October California Basic
Educational Data System (CBEDS) count for those in kindergarten through twelfth
grades. In this study, FCMAT used the December Pupil Count from CASEMIS (ages
5-22) and the October count from CBEDS (K-12 only). A review of the data over the past
three years indicates that Walnut Creek Elementary is at or below the statewide average
identification rate for special education, but maintains a higher average than the SELPA as
a whole.
Special Education Identification Rates (K-12)
SCHOOL YEAR WALNUT CREEK CONTRA COSTA SELPA STATE
2006-07 10% 6.1% 10%
2007-08 9.3% 5.4% 10.3%
2008-09 9.1% 6.0% 10.0%
Source: California Special Education Management Information System (CASEMIS) (K-12);
CBEDS (K-12) October 2008
FCMAT compared the exit rate from special education in Walnut Creek Elementary
with the rate for other elementary districts in the SELPA. The data in the following
table represents the percentage of students who left the program to transfer to regular
education. The district has made considerable progress in this area.
Special Education Exit Rates 2009
ELEMENTARY SCHOOL DISTRICT EXIT RATE FOR SPECIAL EDUCATION 2009
Brentwood Union 19.3%
Byron Union 3%
Knightsen Elementary 2.4%
Lafayette Elementary 9.3%
Moraga Elementary 3%
Oakley Union 7%
Orinda Union 4.2%
Walnut Creek Elementary 10.3%
Walnut Creek Elementary School District
20 CERTIFICATED STAFF AND CLASSIFIED AIDES
Recommendations
The district should:
1. Develop a master plan that includes a training module for Response to Instruction and
Intervention and details the implementation process for that instructional system.
2. Ensure that students receive high-quality standards-based instruction and that
all staff members have access to scientific researched-based instruction and
interventions.
3. Ensure that the district has appropriate state-approved supplemental intervention
programs for tiers II and III.
4. Review universal screening models and determine which will be most appropriate
for the district. Dynamic Indicators of Basic Early Literacy Skills (DIBELS) is
free through the University of Oregon. Aims web is another option.
5. Determine what progress monitoring system is most appropriate to meet student
and district needs.
6. Create or purchase a system for collecting and monitoring progress data. This
is an important component to help assess students’ academic and behavioral
performance and evaluate the effectiveness of instruction.
7. Ensure all staff members obtain extensive training in assessments, data analysis,
programs, and researched-based instructional practices and strategies.
8. Ensure that parents are active and participate in all stages of the process to
increase the chances of success.
9. Consider whether Response to Instruction and Intervention should be used as part
of determining eligibility for a specific learning disability.
10. Develop and implement a districtwide SST process. The process should include
the use of Response to Instruction and Intervention before assessing for special
education. The San Joaquin County Office of Education has developed an
excellent SST Handbook that is available on its Web site.
11. Annually examine the exit rates for special education based on student’s return to
general education. This information is available from the SELPA CASEMIS and
reported on June 30 of each school year.
12. Closely review the identification rates for special education as a whole and by
disability area to assist in program development, training and progress monitoring.
Fiscal Crisis & Management Assistance Team
TImE mANAgEmENT 21
Time Management
The district significantly reduced the level of support staff at the central office because of
the state’s fiscal crisis. As a result, central office administrators have several additional
duties.
The district continues to maintain a full-time director of special services who also
oversees 504 plans, suspension/expulsion, response to intervention, attendance and home
hospital instruction. FCMAT reviewed a time study completed by the director of special
services and found that four areas could be redefined to maximize available time in the
director’s daily schedule. The director is estimated to spend his time as follows:
• IEP meetings – 15 hours
• Evaluating certificated staff members at school sites – Two hours
• Problem solving, writing correspondence, etc – 15 hours
• Billing participating districts for regional program participation per the
memorandum of understanding – Two hours
California Education Code Section 56341 defines the required membership of IEP teams.
Section (4) (A-C) states that a representative of the local educational agency must meet
the following criteria:
• Be qualified to provide, or supervise the provision of specially designed
instruction to meet the unique needs of individuals with exceptional needs.
• Be knowledgeable about the general education curriculum.
• Be knowledgeable about the availability of resources of the local educational
agency.
The director of special services is not required to attend every IEP meeting as the local
educational agency representative (administrative designee). Problematic cases and those
involving a change in placement are exceptions. With proper training, the representative
of the local educational agency could be the site principal, vice principal, psychologist or
other staff member who meets the criteria.
The Education Code also does not require special education teachers to be evaluated by the
director of student services. It would be more efficient to assign principals to evaluate teachers,
avoiding unnecessary travel time and increasing the focus on district responsibilities.
The director spends almost two days a week in the special education office solving
problems and writing correspondence. It may be helpful for the director to work
with a mentor to review the types of problematic cases, the length and complexity of
correspondence, and the issues that necessitate this level of focus. Greater efficiency
can be achieved by streamlining correspondence, identifying the problem areas, and
addressing concerns for the future.
Walnut Creek Elementary School District
22 TImE mANAgEmENT
The amount of time used to complete the billing process for regional programs is unclear;
however, it was listed as an area of concern in the district’s time study. To maximize
the available time and efficiency of the director of special services, the district should
consider whether this function should be assigned to the Business Department.
Recommendations
The district should:
1. Provide training and guidance to district-selected administrative designees so they
can attend IEP meetings.
2. Continue assigning the director of special services to attend problematic IEP
meetings and those involving a change in student placement.
3. Consider designating the school site principal to evaluate the special education
staff.
4. Identify a local mentor to provide guidance and support to the director of special
services to increase efficiency in time management.
5. Reevaluate the duties involved in billing for regional programs and determine
whether they should be reassigned to the business office.
Fiscal Crisis & Management Assistance Team
ORgANIzATIONAL REvIEW OF CENTRAL OFFICE 23
Organizational Review of Central Office
District Office Administrative Staffing Comparison
To complete this comparison, FCMAT obtained staffing data from six elementary school
districts that operate K-8 programs in the Walnut Creek geographic region. The districts
were Brentwood, Lafayette, Menlo Park, Millbrae, San Carlos and Belmont-Redwood
Shores.
Data was obtained for all administrative and classified support positions in the following
district office units: the superintendent’s office, human resources, curriculum/instruction,
student services/special education and business services. Nonadministrative certificated
positions were not reported, and confidential designated positions were included with
classified support positions. In business services, only support positions performing
financial, accounting, payroll, purchasing and human resources functions were surveyed.
The following two tables summarize the administrative and classified support staffing
data compiled for each comparison district. These tables indicate the various titles
reported by comparison districts and the full-time equivalent (FTE) positions in each job
classification. The total for FTE administrative or classified support positions is reported
for each comparison district, as well as a staffing ratio for each district. Finally, the
average staffing ratio for all comparison districts (excluding Brentwood) is included.
The table titled “Combined Total District Office Staffing” contains the combined total
FTE staffing for each comparison district as well as a total district office staffing ratio.
In addition, the average total district office staffing ratio for all comparison districts
(excluding Brentwood) is included.
Walnut Creek Elementary School District
24 ORgANIzATIONAL REvIEW OF CENTRAL OFFICE
Fiscal Crisis & Management Assistance Team
SNOSIRAPMOC
GNIFFATS
ECIFFO
TCIRTSID
NOIGER
KEERC
TUNLAW
NI
STCIRTSID
LOOHCS
YRATNEMELE
8-K
naS
earblliM
olneM
etteyafaL
doowtnerB
tnomleB
tunlaW
SNOITISOP
EVITARTSINIMDA
solraC
kraP
keerC
549,2
531,2
904,2
502,3
742,8
947,2
6323
*tnemllornE
00.1
00.1
00.1
00.1
00.1
00.1
00.1
tnednetnirepuS
00.1
RH
,tnednetnirepuS
tnatsissA
00.1
00.1
noitcurtsnI
&
mulucirruC
,tnednetnirepuS
tnatsissA
00.1
lennosreP
dna
secivreS
lanoitacudE
,tnednetnirepuS
tnatsissA
00.1
seitilicaF
dna
secivreS
ssenisuB
fo
tnednetnirepuS
tnatsissA
00.1
00.1
00.1
00.1
00.1
laiciffO
ssenisuB
feihC
00.1
secivreS
lacsiF
,rotceriD
noitacudE
laicepS/mulucirruC
fo
rotceriD
00.1
00.1
noitacudE
laicepS
&
secivreS
tnedutS
fo
rotceriD
00.1
57.0
00.1
lanoitacudE
fo
rotceriD
,noitcurtsnI
&
mulucirruC
,rotceriD secivreS
00.1
)dE
cepS
ton(
secivreS
tnedutS
,rotceriD
00.1
00.1
00.1
00.1
stnedutS
,secivreS
laicepS
,noitacudE
laicepS
fo
srotceriD
smargorP
laicepS
dna
secivreS
00.1
05.0
reganaM
margorP
,noitacudE
laicepS
fo
rotanidrooC
000.4
057.3
005.4
000.4
000.6
000.4
000.3
ETF
srotartsinimdA
latoT
4100.0
8100.0
9100.0
2100.0
7000.0
5100.0
9000.0
**oitaR
tneduts
dellorne
rep
5100.0
gniffatS
evitartsinimdA
egarevA
50.4
srotartsinimdA
fo
rebmuN
egarevA
)doowtnerB
gnidulcxE
stcirtsiD
nosirapmoC(
SDEBC
90-8002
*
ORgANIzATIONAL REvIEW OF CENTRAL OFFICE 25
Walnut Creek Elementary School District
SNOSIRAPMOC
GNIFFATS
ECIFFO
TCIRTSID
NOIGER
KEERC
TUNLAW
NI
STCIRTSID
LOOHCS
YRATNEMELE
8-K
naS
earblliM
olneM
etteyafaL
doowtnerB
tnomleB
tunlaW
SNOITISOP
EVITARTSINIMDA
solraC
kraP
keerC
549,2
531,2
904,2
502,3
742,8
947,2
6323
*tnemllornE
00.1
00.1
00.1
00.1
00.1
00.1
00.1
tnednetnirepuS
00.1
RH
,tnednetnirepuS
tnatsissA
00.1
00.1
noitcurtsnI
&
mulucirruC
,tnednetnirepuS
tnatsissA
00.1
lennosreP
dna
secivreS
lanoitacudE
,tnednetnirepuS
tnatsissA
00.1
seitilicaF
dna
secivreS
ssenisuB
fo
tnednetnirepuS
tnatsissA
00.1
00.1
00.1
00.1
00.1
laiciffO
ssenisuB
feihC
00.1
secivreS
lacsiF
,rotceriD
noitacudE
laicepS/mulucirruC
fo
rotceriD
00.1
00.1
noitacudE
laicepS
&
secivreS
tnedutS
fo
rotceriD
00.1
57.0
00.1
lanoitacudE
fo
rotceriD
,noitcurtsnI
&
mulucirruC
,rotceriD secivreS
00.1
)dE
cepS
ton(
secivreS
tnedutS
,rotceriD
00.1
00.1
00.1
00.1
stnedutS
,secivreS
laicepS
,noitacudE
laicepS
fo
srotceriD
smargorP
laicepS
dna
secivreS
00.1
05.0
reganaM
margorP
,noitacudE
laicepS
fo
rotanidrooC
000.4
057.3
005.4
000.4
000.6
000.4
000.3
ETF
srotartsinimdA
latoT
4100.0
8100.0
9100.0
2100.0
7000.0
5100.0
9000.0
**oitaR
tneduts
dellorne
rep
5100.0
gniffatS
evitartsinimdA
egarevA
50.4
srotartsinimdA
fo
rebmuN
egarevA
)doowtnerB
gnidulcxE
stcirtsiD
nosirapmoC(
SDEBC
90-8002
*
SNOSIRAPMOC
GNIFFATS
ECIFFO
TCIRTSID
NOIGER
KEERC
TUNLAW
NI
STCIRTSID
LOOHCS
YRATNEMELE
8-K
naS
earblliM
olneM
etteyafaL
doowtnerB
tnomleB
tunlaW
SNOITISOP
TROPPUS
DEIFISSALC
solraC
kraP
keerC
*tnemllornE
549,2
531,2
904,2
502,3
742,8
947,2
6323
evitartsinimdA
,tnatsissA
evitucexE
,yraterceS
s’tnednetnirepuS
000.1
000.1
000.1
000.1
000.1
000.1
000.1
)tnednetnirepuS
eht
ot(
tnatsissA
tnatsissA
ot
tnatsissA
evitartsinimdA
,tnatsissA
evitartsinimdA
,yraterceS
tcirtsiD
,yraterceS
evitartsinimdA
,tnednetnirepuS
526.1
000.2
000.2
000.4
000.2
000.2
tnatsissA
eciffO
,yraterceS
laicepS
,secivreS
lanoitacudE
,mulucirruC
fo
seiraterceS
000.2
000.1
005.1
secivreS
laicepS
dna
noitacudE
RH
,tsilaicepS
RH
,tsilaicepS
lennosreP
,rosivrepuS
lennosreP
000.1
057.0
000.1
000.1
000.1
000.1
000.1
naicinhceT
lennosreP
,naicinhceT
005.0
004.1
krelC
lennosreP
,tnatsissA
lennosreP
005.0
krelC/rotanidrooC
etutitsbuS
000.1
000.1
tnatsissA
eciffO
,krelC
eciffO
tcirtsiD
006.0
tsylanA
ataD
000.1
000.1
secivreS
lacsiF
,rotanidrooC
,rosivrepuS
gnitnuoccA
& tegduB
stifeneB
htlaeH
& lloryaP
,stifeneB
eeyolpmE
& lloryaP
000.1
007.0
000.1
stifeneB
dna
lloryaP-tssA
nimdA
,rotanidrooC
.rS
,hceT
gnitnuoccA
ssenisuB
,tsylanA
tegduB
,tsylanA
lacsiF
,repeekkooB
lareneG
,naicinhceT
selbayaP
,krelC
tnuoccA
000.2
000.2
000.1
000.1
000.3
000.1
000.2
krelC
elbayaP
stnuoccA
,krelC
tnuoccA
lloryaP-krelC
tnuoccA
.rS
,naicinhceT
lloryaP
008.0
000.1
000.1
000.1
krelC
gnisahcruP
,tnegA
gnisahcruP
000.1
005.0
/ecnadnettA
tnedutS
,tsilaicepS
gnitnuoccA
&
ecnadnettA
000.1
000.1
krelC
tnuoccA
000.8
571.7
000.6
000.8
005.21
006.9
006.9
ETF
troppuS
deifissalC
latoT
7200.0
4300.0
5200.0
5200.0
5100.0
5300.0
0300.0
**oitaR
tneduts
dellorne
rep
9200.0
gniffatS
troppuS
deifissalC
egarevA
557.7
ffatS
troppuS
deifissalC
ETF
egarevA
)doowtnerB
gnidulcxE
stcirtsiD
nosirapmoC(
SDEBC
90-8002
*
26 ORgANIzATIONAL REvIEW OF CENTRAL OFFICE
DISTRICT OFFICE STAFFING COMPARISONS
K-8 ELEMENTARY SCHOOL DISTRICTS IN WALNUT CREEK REGION
COMPOSITE DISTRICT OFFICE Walnut Belmont Brentwood Lafayette Menlo Millbrae San
STAFFINGS Creek Park Carlos
Enrollment 3236 2,749 8,247 3,205 2,409 2,135 2,945
Total District Office Staffing in 12.600 13.600 19.000 12.000 11.500 11.175 12.000
Designated Areas
Total District Office Staffing Ratio 0.0039 0.0049 0.0023 0.0037 0.0048 0.0052 0.0041
(Staffing FTE/Enrollment)
Average Total District Office 0.0046 per enrolled student
Staffing
Average Total District Office Staff 12.0550
(Comparison Districts Excluding
Brentwood)
District Office Administrative Staffing
The average administrative staffing ratio in the comparison districts is .0016. Comparison
districts employ an average of 4.05 administrators, and Walnut Creek Elementary
employs three district office administrators; the superintendent, chief business official and
director of special services.\
Two of the five comparison districts employ assistant superintendents with primary
responsibility for curriculum/instruction. Each of the other three utilizes a director-level
administrator that manages the curriculum/instruction area.
Unlike each of the comparison districts, Walnut Creek Elementary does not employ an
administrator with separate responsibility for curriculum/instruction functions. Instead,
curriculum/instruction is among the areas managed by the superintendent. The absence
of a separate administrator to manage curriculum/instruction functions is unique among
comparison districts.
District Office Classified Support Staffing
The average classified staffing ratio in the comparison districts is .0029. Comparison
districts employ an average of 7.755 FTE classified support staff, and the classified
staffing ratio at Walnut Creek Elementary is .0030. The two districts closest in enrollment
to Walnut Creek Elementary (Lafayette and San Carlos) have average staffing ratios
of.0026. Each employs eight district office classified support staff members.
Fiscal Crisis & Management Assistance Team
ORgANIzATIONAL REvIEW OF CENTRAL OFFICE 27
Walnut Creek Elementary has classified support staffing similar to that of the comparison
districts. However, a lower staffing ratio exists in the two districts closest in enrollment
to Walnut Creek Elementary. Employing classified support staff at a ratio of .0026
per enrolled student (the average ratio in Lafayette and San Carlos) would result in a
reduction from 9.6 FTE to 8.41 FTE for Walnut Creek Elementary.
Combined District Office (Administrative and Classified) Staffing
The average combined district office staffing ratio in the comparison districts is .0044.
Comparison districts employ an average of 11.805 total district office staff, while Walnut
Creek Elementary employs 12.6 FTE; .0039 per enrolled student.
The comparison subgroup of Lafayette and San Carlos with enrollments closest to Walnut
Creek Elementary has an average total staffing ratio of .0043 (12.533 FTE).
Walnut Creek Elementary has a total district office staffing level that is lower than the
comparison districts based on reported staffing ratios per enrolled student (.0044 vs.
WCSD’s .0039). The total district office staffing ratio of .0039 is also lower than the
average ratio in Lafayette and San Carlos, which is .0043.
In each of the above comparisons, Walnut Creek Elementary achieves a lower combined
staffing ratio by offsetting a higher classified staffing level with administrative staffing
that is lower than the comparison districts.
District Office Organization
Walnut Creek Elementary has a total district office staffing level that is comparable
to staffing in Lafayette and San Carlos, the districts with the most similar average
enrollment. However, classified support staffing at Walnut Creek Elementary is higher
than these districts by approximately 1.2 FTE (adjusted for enrollment). This result is
achieved by offsetting a higher classified staffing level with lower administrative staffing.
A review of the existing organizational structure at Walnut Creek Elementary suggests
the opportunity for some staffing/assignment modifications that are detailed below and
reflected in the organizational charts included in appendix section of this report. The
existing classified support staffing for superintendent, business and personnel functions is
shown in the first chart. The total FTE classified support for superintendent, business and
personnel functions is 8.6.
Walnut Creek Elementary School District
28 ORgANIzATIONAL REvIEW OF CENTRAL OFFICE
SUPERINTENDENT
1.0 Administrative Assistant Administrative support for Supt and Board
1.0 District Office Secretary Administrative support for C&I functions / D.O. receipt
1.0 Human Resources Specialist District HR functions
0.6 Data Analyst Data management, student info/assessment & reporting
0.5 Sub Coordinator/Clerk Certificated and classified substitute assignment
BUSINESS
1.0 Payroll & Health Ben- Payroll/Employee benefits functions
efits Coordinator
1.0 General Bookkeeper Food service accounting/accounts receivable
1.0 Account Clerk Attend accounting, statistical & financial records & reporting
0.5 Purchasing Clerk Purchase order processing
1.0 Office Assistant Data management, student info/assessment & reporting
Recommendations
The district should:
1. Consider implementing the organizational structure depicted in the appendix
section of this report. This would reduce the number of existing FTE positions in
the superintendent’s office and business office from 8.6 to 7.75. Further, the total
number of full-time and part-time positions would be reduced from 10 to eight,
resulting in lower costs to the district for employee benefits and other personnel
expenses.
2. Eliminate the substitute coordinator/clerk position in the superintendent’s office.
The district utilizes an automated substitute calling system. The responsibility to
monitor the operation of the substitute calling system could be shifted to one of the
other positions in that office such as the data analyst. Recruitment and employment
of substitute employees should be shifted to the HR specialist.
3. Eliminate the business office’s purchasing clerk position. The task of processing of
purchase orders should be reassigned to one or both of the new account clerk posi-
tions recommended by FCMAT.
4. Eliminate the business office’s office assistant position. The duties related to stu-
dent attendance accounting should be transferred to the data analyst in the superin-
tendent’s office. The miscellaneous statistical recordkeeping and financial report-
ing duties should be reassigned to other positions in the superintendent’s office and
business office.
Fiscal Crisis & Management Assistance Team
ORgANIzATIONAL REvIEW OF CENTRAL OFFICE 29
5. Increase the FTEs of the data analyst in the superintendent’s office from .6 FTE to
.75 FTE
6. Create a fiscal analyst position in the business office to perform the more techni-
cally difficult and complex budget management and accounting functions and
provide the two account clerks with technical leadership, training and direction.
The new position would not be supervisory, but operate as a lead worker in the
business office.
7. Change the title of the general bookkeeper position to account clerk.
8. Review the duties of the general bookkeeper, account clerk and office assistant
positions in the business office and reallocate them among the new fiscal analysts
and the two account clerks.
Walnut Creek Elementary School District
30 ORgANIzATIONAL REvIEW OF CENTRAL OFFICE
Fiscal Crisis & Management Assistance Team
AppENDICES 31
Appendices
A. Organizational Charts
B. Study Agreement
Walnut Creek Elementary School District
32 AppENDICES
Fiscal Crisis & Management Assistance Team
AppENDICES 33
Walnut Creek School District
Existing District Office Organization Structure
SSuuppeerriinntteennddeenntt,, BBuussiinneessss aanndd PPeerrssoonnnneell OOffffiicceess
Superintendent
(Administrative Services)
AAddmmiinniissttrraattiivvee
((CCuurrrriiccuulluumm && IInnssttrruuccttiioonn))
Assistant
(Human Resources)
1.0 1.0
District Office
Chief
Secretary 1.0
11.00 BBusiiness OOffffiiciiall
Payroll/Health Human Resources
1.0
Benefits Coordinator Specialist 1.0
General Bookkeeper
Data Analyst
1.0
.60
Account Clerk
11.00 Sub Coordinator
Clerk .50
Purchasing Clerk
.50
BUDGETED POSITIONS
Office Assistant
1.0 • 2.0 Administrative
• 8.6 Classified Support
Walnut Creek Elementary School District
34 AppENDICES
Walnut Creek School District
Alternative District Office Organization Structure
SSuuppeerriinntteennddeenntt,, BBuussiinneessss aanndd PPeerrssoonnnneell OOffffiicceess
Superintendent
(Administrative Services)
AAddmmiinniissttrraattiivvee
((CCuurrrriiccuulluumm && IInnssttrruuccttiioonn))
Assistant
(Human Resources)
1.0 1.0
District Office
Chief
Secretary 1.0
11.00 BBusiiness OOffffiiciiall
Payroll/Health Human Resources
1.0
Benefits Coordinator Specialist 1.0
Fiscal Analyst
Data Analyst
1.0
.75
Account Clerk
11.00
Account Clerk
1.0
BUDGETED POSITIONS
• 2.0 Administrative
• 7.75 Classified Support
Fiscal Crisis & Management Assistance Team
AppENDICES 35
Walnut Creek Elementary School District
36 AppENDICES
Fiscal Crisis & Management Assistance Team
AppENDICES 37
Walnut Creek Elementary School District
38 AppENDICES
Fiscal Crisis & Management Assistance Team
AppENDICES 39
Walnut Creek Elementary School District
40 AppENDICES
Fiscal Crisis & Management Assistance Team