1.1 School Safety - CDE Civil Defense and Disaster Planning Guide
Legal Standard
All school administrators should be thoroughly familiar with the California Department of Edu-
cation, Civil Defense and Disaster Planning Guide for School Officials, 1972. [EC 32000-32004,
32040, 35295-35297, 38132, 46390-46392, 49505, GC 3100, 8607, CCR Title 5 §550, 560, Title
19 §2400]
Progress on Recommendations and Improvement Plan
1. District personnel have held numerous meetings regarding disaster preparedness. One
of the topics discussed is the need for a county plan for total evacuation of the schools
in case of such an emergency. The State Administrator is working with the county
transportation agency to arrange an emergency plan where the county transporta-
tion agency would assist with the evacuation of all employees and students from the
schools. However, to date, no written plan is in place.
2. The district is still in the process of inventorying the first-aid kits to determine if they
contain the minimum supply levels.
3. No new signage was observed during the site visit. The only signage noted was posted
on the fence from the parking lot to the schools directing visitors to check in at the
office. There were no citations of any violation of Penal Code or local law enforce-
ment codes. During the site visit on April 27, 2004, the inspector was able to walk the
elementary campus without a challenge by any school staff.
4. Once the new disaster planning guide is developed and adopted, the district will begin
training all staff and administration on the information contained in the guide.
Standard Implemented: Partially
June 2003 Rating: 1
December 2003 Rating: 2
June 2004 Self-Rating: 3
June 2004 New Rating: 3
Implementation Scale:
Facilities Management 1
1.3 School Safety - Plan for Protection of People and Property
Legal Standard
The district should be able to demonstrate that a plan of security has been developed that in-
cludes adequate measures of safety and protection of people and property. [EC 32020, 32211,
35294-35294.9]
Progress on Recommendations and Improvement Plan
1. The district continues to develop the safety plan, but no written plan has been com-
pleted to date. However, the district continues to perform monthly fire drills and
maintains logs of the dates and times they are held. The classrooms now have supplies
to use in case of an emergency.
2. Once the safety plan is developed and adopted, the district will coordinate the training
for all staff.
3. The district continues to require all visitors to the campuses to sign in at the school
office before the visitors can proceed to their destinations. This was verified by the in-
spector during his April 28, 2004, site visit when he was required to sign in and wear a
badge during the site visit.
4. The recommended “no trespassing” signs were not noted during the site visit. There
were signs directing visitors to the office upon arrival, but there were no “no loitering”
or “no trespassing” signs by the main entrances or loading zones.
Standard Implemented: Partially
June 2003 Rating: 3
December 2003 Rating: 4
June 2004 Self-Rating: 4
June 2004 New Rating: 4
Implementation Scale:
2 Facilities Management
1.15 School Safety - Injury/Illness Prevention Program Inspections are Done
Legal Standard
The Injury and Illness Prevention Program (IIPP) requires periodic inspections of facilities to
identify conditions. [CCR Title 8 §3203]
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to
update current board policies, including Policy 6110 relating to IIPP. Until CSBA pro-
vides current board policies, the district has adopted an administrative policy for IIPP.
2. The work associated with the CSBA contract should include a detailed administra-
tive regulation regarding the IIPP. In conjunction with the regulation, the district will
develop a handbook to implement the program.
3. The district will emphasize the importance of these regulations to all staff during an
in-service training following adoption of the regulations.
Standard Implemented: Partially
June 2003 Rating: 0
December 2003 Rating: 1
June 2004 Self-Rating: 1
June 2004 New Rating: 1
Implementation Scale:
Facilities Management 3
1.18 School Safety - Plan for Prevention of Campus Crime and Violence
Legal Standard
A comprehensive school safety plan exists for the prevention of campus crime and violence.
[EC 35294-35294.9]
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to up-
date current board policies.
2. While the district has not completed the writing of the safety plan, it will be contract-
ing with two school safety experts to train all staff in school safety.
Standard Implemented: Partially
June 2003 Rating: 1
December 2003 Rating: 2
June 2004 Self-Rating: 2
June 2004 New Rating: 2
Implementation Scale:
4 Facilities Management
1.19 School Safety - An Emergency Action Plan Exists
Legal Standard
Each public agency is required to have on file written plans describing procedures to be em-
ployed in case of emergency. [EC 32000-32004, 32040, 35295-35297, 38132, 46390-46392,
49505, GC 3100, 8607] [CCR Title 8, §3220]
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to
update current board policies, including Board Policy 6114 regarding the emergency
plan.
2. The district has not finished writing the plan.
3. The district will be contracting with two school safety experts to train all staff in
school safety.
Standard Implemented: Partially
June 2003 Rating: 0
December 2003 Rating: 2
June 2004 Self-Rating: 2
June 2004 New Rating: 2
Implementation Scale:
Facilities Management 5
1.25 School Safety - Maintenance of a Comprehensive Employee Safety
Program
Professional Standard
The district maintains a comprehensive employee safety program. Employees should be aware
of the district safety program, and the district provides in-service training to employees on the
requirements of the safety program.
Progress on Recommendations and Improvement Plan
1. The employees continue to concentrate on working under safe conditions. Any unsafe
working conditions are immediately reported to their supervisor for correction. This
was witnessed during the site visit on April 28, 2004.
2. The district recently provided in-service training for staff regarding proper safe work
practices including Material Safety Data Sheets (MSDS) and associated chemicals.
This training was conducted by the Director of Maintenance and Operations, with
documentation provided by the Insurance JPA and Fresno State University. Additional
training is scheduled in the near future.
Standard Implemented: Partially
June 2003 Rating: 5
December 2003 Rating: 6
June 2004 Self-Rating: 7
June 2004 New Rating: 7
Implementation Scale:
6 Facilities Management
2.14 Facility Planning - Collection of Statutory Developer Fees
Legal Standard
The district should collect statutory school fees. [EC 17620, GC 65995, 66000]
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to up-
date current board policies on statutory school fees.
2. The district continues to impose the maximum allowable fee. It is joining in the Wash-
ington High School District’s developer fee analysis study to determine the maximum
developer fee that can be charged by both districts.
3. Washington Union High School District collects the fees for the district and issues
warrants to the district on a regular basis based on the percentages agreed to by the
two districts, which are currently 60 percent for the West Fresno Elementary District
and 40 percent for the Washington Union High School District. This recently benefited
the district when a large industrial warehouse complex was built, netting the district
more than $100,000 in developer fees. With new apartment complexes under con-
struction, an additional $150,000 should be received from the high school district.
Standard Implemented: Fully - Substantially
June 2003 Rating: 5
December 2003 Rating: 7
June 2004 Self-Rating: 9
June 2004 New Rating: 8
Implementation Scale:
Facilities Management 7
3.12 Facilities Improvement and Modernization - Deferred Maintenance
Projects are Actively Managed
Professional Standard
The district actively manages the deferred maintenance projects. The district should review the
five-year deferred maintenance plan annually to remove any completed projects and include any
newly eligible projects. The district should also verify that the projects performed during the year
were included in the state-approved, five-year deferred maintenance plan.
Progress on Recommendations and Improvement Plan
1. The district does not have any projects that qualify for extreme hardship. The only
project that could qualify is the locker rooms by the gymnasium, and the district is
attempting to qualify for state modernization funding to demolish and build a new
shower facility for the students.
2. The Director of Maintenance and Operations updates the five-year deferred main-
tenance plan regularly to remove maintenance items completed during the year and
include projects that have become eligible for deferred maintenance funding.
3. When the director updated the five-year plan, he also adjusted the estimated costs for
the projects and identified whether the projects should remain on the plan or others
should be added.
Standard Implemented: Partially
June 2003 Rating: 5
December 2003 Rating: 6
June 2004 Self-Rating: 6
June 2004 New Rating: 6
Implementation Scale:
8 Facilities Management
4.2 Construction of Projects - Change Orders are Processed and Received
Prior to Approval
Professional Standard
Change orders are processed and receive prior approval from required parties before being
implemented within respective construction projects.
Progress on Recommendations and Improvement Plan
1. While the proper procedures are understood in that all change orders must receive
approval from the architect, inspector of record, and State Administrator, no written
procedures have been developed to memorialize the procedures.
2. While the standard procedure would be the approval of all change orders by the Gov-
erning Board prior to payment, the State Administrator currently has this authority. It
is understood that all change orders must receive the State Administrator’s approval
prior to payment. Ideally, the State Administrator should approve all change orders
prior to implementation.
Standard Implemented: Partially
June 2003 Rating: 3
December 2003 Rating: 3
June 2004 Self-Rating: 3
June 2004 New Rating: 3
Implementation Scale:
Facilities Management 9
4.4 Construction of Projects - Inspector of Record Assignments are Properly
Approved
Professional Standard
Each Inspector of Record (IOR) assignment is properly approved.
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to up-
date current board policies.
2. With the inception of possible new construction in the near future, the district will
need to establish a procedure for acquiring a certified Division of the State Architect
(DSA) inspector. The Director of Maintenance and Operations is working with the
neighboring Central High School District to obtain a copy of its list of approved in-
spectors.
Standard Implemented: Partially
June 2003 Rating: 5
December 2003 Rating: 5
June 2004 Self-Rating: 5
June 2004 New Rating: 5
Implementation Scale:
10 Facilities Management
5.1 Compliance with Public Contracting Laws and Procedures - Compliance
with Formal Bidding Procedures
Legal Standard
The district complies with formal bidding procedures. [GC 54202, 54204, PCC 20111]
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to
update current board policies, including Board Policy 3311 regarding the formal bid
process.
2. The district will continue to contract for services to guarantee that all aspects of the
bidding process are followed. Some of the district staff received training recently on
the various aspects of the bid process to obtain a better understanding of the process.
The district plans to coordinate the bid process with the architect so that the architect
distributes and collects the bid packages that are opened at the designated time and
witnessed by at least one district representative.
Standard Implemented: Partially
June 2003 Rating: 5
December 2003 Rating: 6
June 2004 Self-Rating: 6
June 2004 New Rating: 6
Implementation Scale:
Facilities Management 11
5.2 Compliance with Public Contracting Laws and Procedures - Procedures for
Requests for Quote/Proposals
Legal Standard
The district has a procedure for requests for quotes/proposals. [GC 54202, 54204, PCC 20111]
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to
update current board policies, including Board Policy 3311 regarding informal quotes
and proposals. The revisions will establish the dollar amounts for when quotes will be
required to be obtained, and the approval levels for allowing quotes to be executed.
2. The district will continue to contract for services to guarantee that all aspects of the
quote/proposal process are followed. The district plans to coordinate the quote/pro-
posal process with the architect so that a consistent process is used in obtaining quotes
or proposals from the responsible vendors.
3. As of the latest site visit, new procedures had not been developed regarding quotes
and proposals.
Standard Implemented: Partially
June 2003 Rating: 2
December 2003 Rating: 2
June 2004 Self-Rating: 2
June 2004 New Rating: 2
Implementation Scale:
12 Facilities Management
8.1 Facilities Maintenance and Custodial - Implementation of an Energy
Conservation Program
Professional Standard
An Energy Conservation Policy should be approved by the Governing Board and implemented
throughout the district.
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to
update current board policies. However, if energy efficiency is to be a priority for the
district, it must be agreed upon by the Governing Board and the staff to implement an
energy conservation policy and make it work.
2. The district has already installed cool roofing on all classroom buildings on both
campuses. With no leaks and with the sealed roofing in place, the district has received
a rebate for the installation and has noticed reduced energy costs. The central adminis-
tration building cooling/heating system was recently upgraded with individual thermo-
stats to reduce the imbalance of temperatures in the building.
3. The installation of new sun screens is being postponed until a later time when funding
is available.
Standard Implemented: Partially
June 2003 Rating: 4
December 2003 Rating: 5
June 2004 Self-Rating: 5
June 2004 New Rating: 5
Implementation Scale:
Facilities Management 13
8.10 Facilities Maintenance and Custodial - All Buildings, Grounds
and Bathrooms are Maintained
Legal Standard
Toilet facilities are adequate and maintained. All buildings and grounds are maintained.
[CCR Title 5 § 631]
Progress on Recommendations and Improvement Plan
1. The district has a good documented maintenance system in place. The custodians have
regularly scheduled assignments to check the toilet facilities for graffiti and cleaning
needs. The grounds observed during the site visit were well groomed and provided a
very pleasing atmosphere for the students. However, during the April 28, 2004, site
visit, it was noted that the water pressure for the sprinklers was quite low, causing
some of the lawn area to go unwatered during the extreme heat. It was determined that
the current pump and tank system would not allow for a higher water pressure without
causing greater damage.
Toilet facilities are adequate, but the district has an ongoing challenge of maintaining
the facilities due to student vandalism. Some of the paper towel dispensers were re-
placed by electronic hand dryers, which in some cases reduced the paper towel abuse
but in other cases created a greater hazard when the students ripped the blowers off
the wall, exposing them to bare electric wiring. The district is trying to determine the
best alternative for the different grade levels.
Standard Implemented: Fully - Substantially
June 2003 Rating: 6
December 2003 Rating: 8
June 2004 Self-Rating: 8
June 2004 New Rating: 8
Implementation Scale:
14 Facilities Management
9.1 Instructional Program Issues - Plan for Attractive Landscaped Facilities
Professional Standard
The district has developed a plan for attractively landscaped facilities.
Progress on Recommendations and Improvement Plan
1. The district has a long-range plan that was developed three years ago to keep the land-
scaping attractive.
2. With the tight financial times for both the state and the district, some of the improve-
ments and maintenance items in the landscaping plan have been postponed. During
the April 27, 2004, site visit, it was noted that the landscaping has deteriorated even
though the plan required that certain landscaping needs be met. The combination of
reduced funds and the sudden heat wave have made it a challenge to keep the grounds
in good condition.
Standard Implemented: Partially
June 2003 Rating: 4
December 2003 Rating: 6
June 2004 Self-Rating: 5
June 2004 New Rating: 5
Implementation Scale:
Facilities Management 15
9.2 Instructional Program Issues – District-Wide Technology Plan to Benefit
All Sites
Professional Standard
The goals and objectives of the technology plan should be clearly defined. The plan should in-
clude both the administrative and instructional technology systems. There should be a summary
of the costs of each objective and a financing plan should be in place.
Progress on Recommendations and Improvement Plan
1. The district is still attempting to close out the E-rate funding expenditures.
2. The district has received approval of a detailed technology plan that was created by
one of the district’s teaching staff.
3. Now that the district has developed and received approval of the technology plan, the
plan is being used to obtain grant funding for both acquisition and maintenance of
technology. The district was also fortunate to receive computers donated by an Indian
casino.
Standard Implemented: Partially
June 2003 Rating: 3
December 2003 Rating: 3
June 2004 Self-Rating: 6
June 2004 New Rating: 6
Implementation Scale:
16 Facilities Management
9.3 Instructional Program Issues - Lunch Areas are Warm, Healthful and Safe
Legal Standard
The Governing Board shall provide a warm, healthful place in which children who bring their
own lunches to school may eat their lunch. [EC 17573, CCR Title 5 §14030]
Progress on Recommendations and Improvement Plan
1. The district still needs to aggressively pursue funding to modernize the primary
cafeteria building. It is one of many things on the list of things to accomplish, but with
limited staffing, it is not easy to move this up on the list.
2. With the lack of sufficient state and local funding for deferred maintenance, the
cafeteria lighting could not be done with deferred maintenance revenues.
3. The district has not replaced the primary cafeteria flooring in the past year. It is still
very old tile that is quite worn and difficult to keep clean or at least have the appear-
ance of being clean. It was noted during the walkthrough that the floor was indeed
clean, just old. However, during the site visit on April 28, 2004, it was noted that the
middle school cafeteria was immaculate. The custodial staff is required to wet mop the
floor at least twice a day to ensure that it is as clean as possible.
4. The maintenance/custodial/cafeteria staff received training on safe work habits during
the summer months. This training will be repeated and updated annually for the staff.
Standard Implemented: Partially
June 2003 Rating: 2
December 2003 Rating: 3
June 2004 Self-Rating: 4
June 2004 New Rating: 4
Implementation Scale:
Facilities Management 17
9.4 Instructional Program Issues - Bathroom Facilities are Clean
and Operable
Legal Standard
The Governing Board of every school district shall provide clean and operable flush toilets for
the use of pupils. [EC 17576, CCR Title 5 §14030]
Progress on Recommendations and Improvement Plan
1. The district has a good documented maintenance system in place. The custodians have
regularly scheduled assignments to check the toilet facilities for graffiti and cleaning
needs. Toilet facilities are adequate, but the district has an ongoing challenge of main-
taining the facilities due to student vandalism. Some of the paper towel dispensers
were replaced by electronic hand dryers, which in some cases reduced the paper towel
abuse, but in other cases created a greater hazard when the students ripped the blowers
off the wall, exposing them to bare electric wiring. The district is trying to determine
the best alternative for the different grade levels.
Standard Implemented: Fully – Substantially
June 2003 Rating: 6
December 2003 Rating: 8
June 2004 Self-Rating: 8
June 2004 New Rating: 8
Implementation Scale:
18 Facilities Management
10.1 Community Use of Facilities - Plan to Promote Community Involvement
in Schools
Professional Standard
The district should have a plan to promote community involvement in schools.
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to up-
date current board policies, including community use of district facilities. It is impor-
tant that the final board policies provide the district with specific direction on the use
of facilities, the approval/disapproval process, and evaluation of use of facilities.
The district is working with community groups to promote the use of school facilities.
The soccer fields are used continuously on weekends by the community groups. The
only challenge faced by the district is the need for increased security for some of the
groups. The gym is used three nights during the week and requires a $100 deposit to
be paid prior to use. The deposit is returned if no cleaning is required.
2. Applications for civic use permits are available, but are still outdated due to the lack
of updated board policies. Once the new board policy is approved, the form needs to
be updated to reflect the changes.
3. Once the new form is created, it will be translated into Spanish.
Standard Implemented: Partially
June 2003 Rating: 2
December 2003 Rating: 3
June 2004 Self-Rating: 6
June 2004 New Rating: 6
Implementation Scale:
Facilities Management 19
10.2 Community Use of Facilities - Compliance with Civic Center Act for
Community Use
Legal Standard
Education Code Section 38130 establishes terms and conditions of school facility use by commu-
nity organizations, in the process requiring establishment of both “direct cost” and “fair market”
rental rates, specifying what groups have which priorities and fee schedules.
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to up-
date current board policies. It is important that the sites know the acceptable users, the
proper fees to be charged, and the approval process that all staff must follow.
2. The district has not prepared a comprehensive study of allowable costs and charges
for community use of facilities. At this point, the district is concentrating on bringing
the community back to the schools as a central meeting place for the community. The
State Administrator’s focus is to help the community understand that the schools are
here for them.
3. The district currently charges appropriate users a $100 deposit and requires proper
insurance documentation before the facilities can be used. Once the use is complete,
the deposit is returned to the user if no costs have been incurred by the district to clean
or repair the facilities used.
The district will consider setting rates to accurately reflect the current costs of provid-
ing custodial services, utilities, and other services once the facilities are used by groups
other than non-profit and student programs. Currently, the majority of the users are local
soccer groups, student groups such as Girl Scouts, and other parent groups. The only
fees being charged are for custodial overtime when groups leave the facilities unclean.
4. Once the rates are established, school administrators will be given clear guidance as to
when it is appropriate and legal for them to “veto” community use of site facilities.
Standard Implemented: Partially
June 2003 Rating: 1
December 2003 Rating: 1
June 2004 Self-Rating: 1
June 2004 New Rating: 1
Implementation Scale:
20 Facilities Management
10.3 Community Use of Facilities - Maintenance of Records and Support for
Reasonable Charges
Professional Standard
Districts should maintain comprehensive records and controls on civic center implementation
and cash management.
Progress on Recommendations and Improvement Plan
1. The district is working with the California School Boards Association (CSBA) to up-
date current board policies. These policies and the associated regulations and proce-
dures will need to be provided to the site administrators for implementation, especially
for determining the types of users as acceptable or not acceptable.
2. The district is focusing on getting the community back into the schools, with the ma-
jority of the users being community groups that are not required to pay fees. The need
for an extensive recordkeeping system is not necessary at this point due to the lack of
revenues being collected for facilities use.
Standard Implemented: Partially
June 2003 Rating: 0
December 2003 Rating: 1
June 2004 Self-Rating: 1
June 2004 New Rating: 1
Implementation Scale:
Facilities Management 21
22 Facilities Management
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
All school administrators should be thor-
oughly familiar with the California Depart-
ment of Education, Civil Defense and Di-
saster Planning Guide for School Officials,
1.1 1 2 3 ❑
1972. (EC 32000-32004, 32040, 35295-
35297, 38132, 46390-46392, 49505, GC
3100, 8607, CCR Title 5 §550, 560, Title 19
§2400)
The district includes the appropriate security
devices in the design of new buildings as well
1.2 5 NR NR
as in modernized buildings. (EC 32020, 32211,
35294-35294.9, 39670-39675)
The district should be able to demonstrate
that a plan of security has been developed
1.3 that includes adequate measures of safety 3 4 4 ❑
and protection of people and property. [EC
32020, 32211, 35294-35294.9]
The district should ensure that the custodial
and maintenance staff are regularly informed
of restrictions pertaining to the storage and
1.4 disposal of flammable or toxic materials. [EC 4 NR NR
49341, 49401.5, 49411, F&AC 12981, H&SC
25163, 25500-25520, LC 6360-6363, CCR Title
8 §5194]
The district has a documented process for
issuing of master and sub-master keys. A
1.5 districtwide standardized process for the issu- 5 NR NR
ance of keys to employees must be followed by
all district administrators.
Bus loading and unloading areas, delivery
areas, and parking and parent loading/unload-
ing areas are monitored on a regular basis to
1.6 ensure the safety of the students, staff and 7 NR NR
community. Students, employees and the public
should feel safe at all times on school prem-
ises.
The identified subset of standards appears in bold print.
23
NA not applicable Facilities Management
❑ targeted for review NR not reviewed
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
Outside lighting is properly placed and moni-
tored on a regular basis to ensure the oper-
ability/adequacy of such lighting and to ensure
safety while activities are in progress in the
evening hours. Outside lighting should pro-
1.7 vide sufficient illumination to allow for the 6 NR NR
safe passage of students and the public dur-
ing after-hours activities. Lighting should
also provide security personnel with sufficient
illumination to observe any illegal activities on
campus.
The district has a graffiti and vandalism abate-
ment plan. The district should have a written
graffiti and abatement plan that is followed
1.8 7 NR NR
by all district employees. The district provides
district employees with sufficient resources to
meet the requirements of the abatement plan.
Each public agency is required to have on file
written plans describing procedures to be em-
1.9 ployed in case of emergency. (EC 32000-32004, 0 NR NR
32040, 35295-35297, 38132, 46390-46392,
49505, GC 3100, 8607) (CCR Title 8, §3220)
Each elementary and intermediate school at
least once a month, and in each secondary
1.10 school not less than twice every school year, 2 NR NR
shall conduct a fire drill. (EC 32000-32004,
32040, CCR Title 5 §550)
Maintenance/custodial personnel have knowl-
edge of chemical compounds used in school
programs that include the potential hazards
1.11 5 NR NR
and shelf life. (EC 49341, 49401.5, 49411,
F&AC 12981, H&SC 25163, 25500-25520, LC
6360-6363, CCR Title 8 §5194)
Building examinations are performed, and
required actions are taken by the Governing
1.12 4 NR NR
Board upon report of unsafe conditions. (EC
17367)
The identified subset of standards appears in bold print.
24
Facilities Management NA not applicable
NR not reviewed ❑ targeted for review
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
Each school that is entirely enclosed by a
fence or partial buildings must have a gate of
sufficient size to permit the entrance of am-
1.13 8 NR NR
bulances, police, and fire fighting equipment.
Locking devices shall be designed to permit
ready entrance. (EC 32020)
Sanitary, neat and clean conditions of the
school premises exist and the premises are free
1.14 9 NR NR
from conditions that would create a fire hazard.
(CCR Title 5 §633)
The Injury and Illness Prevention Program
(IIPP) requires periodic inspections of fa-
1.15 0 1 1 ❑
cilities to identify conditions. (CCR Title 8
§3203)
Appropriate fire extinguishers exist in each
1.16 building and current inspection information is 7 NR NR
available. (CCR Title 8 §1922(a))
All exits are free of obstructions. (CCR Title 8
1.17 9 NR NR
§3219)
A comprehensive school safety plan exists
1.18 for the prevention of campus crime and vio- 1 2 2 ❑
lence. (EC 35294-35294.9)
Each public agency is required to have on
file written plans describing procedures
to be employed in case of emergency. (EC
1.19 0 2 2 ❑
32000-32004, 32040, 35295-35297,
38132, 46390-46392, 49505, GC 3100,
8607) (CCR Title 8, §3220)
Requirements are followed pertaining to under-
1.20 ground storage tanks. (H&SC 25292, CCR Title NA NA NA
26 §477, Title 23 § 2610)
All asbestos inspection and asbestos work
completed in the U.S. is performed by Asbestos
1.21 Hazard Emergency Response Act (AHERA) ac- 4 NR NR
credited individuals. (EC 49410.5, 40 CFR Part
763)
The identified subset of standards appears in bold print.
25
NA not applicable Facilities Management
❑ targeted for review NR not reviewed
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
All playground equipment meets safety code
regulations and is inspected in a timely fashion
1.22 as to ensure the safety of the students. (EC 8 NR NR
44807, GC 810-996.6, H&SC 24450 Chapter 4.5,
115725-115750, PRC 5411, CCR Title 5 §5552)
Safe work practices exist with regard to boiler
1.23 and fired pressure vessels. (CCR Title 8 §782) NA NA NA
The district maintains Materials Safety Data
1.24 Sheets. (EC 49341, 49401.5, 49411, F&AC 4 NR NR
12981, LC 6360-6363, CCR Title 8 §5194)
The district maintains a comprehensive em-
ployee safety program. Employees should be
aware of the district safety program and the
1.25 5 6 7 ❑
district should provide in-service training to
employees on the requirements of the safety
program.
The district conducts periodic safety training
for employees. District employees should re-
1.26 2 NR NR
ceive periodic training on the safety procedures
of the district.
The district should conduct periodic first-aid
1.27 training for employees assigned to school sites. 3 NR NR
The district should possess a California State
2.2 Department of Education Facilities Planning 10 NR NR
and Construction Guide (dated 1991).
2.3 The district should seek state and local funds. 10 NR NR
The district should have standards for real
2.7 property acquisition and disposal. (EC 39006, 0 NR NR
17230-17233)
The district seeks and obtains waivers from the
2.8 State Allocation Board for continued use of its 10 NR NR
nonconforming facilities. (EC 17284, 17285)
The district has established and utilizes a
2.9 selection process for the selection of licensed 3 NR NR
architectural/engineering services. (GC 17302)
The identified subset of standards appears in bold print.
26
Facilities Management NA not applicable
NR not reviewed ❑ targeted for review
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
The district should assess its local bonding
2.10 6 NR NR
capacity. (EC 15100)
The district should develop a process to deter-
2.11 8 NR NR
mine debt capacity.
The district should be aware of and monitor the
2.12 assessed valuation of taxable property within 10 NR NR
its boundaries.
The district should monitor its legal bonding
2.13 10 NR NR
limits. (EC 15100, 15330)
The district should collect statutory school
2.14 5 7 8 ❑
fees. (EC 17620, GC 65995, 66000)
The district has pursued state funding for joint-
use projects through the filing of applications
2.16 6 NR NR
through the Office of Public School Construc-
tion and the State Allocation Board.
The district has established and utilizes an or-
2.17 ganized methodology of prioritizing and sched- 10 NR NR
uling projects.
The district has a restricted deferred main-
tenance fund and those funds are expended
for maintenance purposes only. The deferred
3.1 maintenance fund should be a stand-alone fund 7 NR NR
reflecting the revenues and expenses for the
major maintenance projects accomplished dur-
ing the year.
The district has pursued state funding for
deferred maintenance - critical hardship needs
by filing an application through the Office of
3.2 4 NR NR
Public School Construction and the State Al-
location Board. (State Allocation Board Regula-
tion §1866)
The district applies to the State Allocation
3.3 Board for facilities funding for all applicable 7 NR NR
projects.
The district consistently reviews and monitors
3.4 its eligibility for state funding so as to capital- 6 NR NR
ize upon maximal funding opportunities.
The identified subset of standards appears in bold print.
27
NA not applicable Facilities Management
❑ targeted for review NR not reviewed
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
The district establishes and implements interim
housing plans for use during the construction
3.5 10 NR NR
phase of modernization projects and/or addi-
tions to existing facilities.
Furniture and equipment items are routinely
3.7 included within the scope of modernization 6 NR NR
projects.
The district obtains approval of plans and
specifications from the Division of the State
Architect and the Office of Public School Con-
3.8 6 NR NR
struction (when required) prior to the award of
a contract to the lowest responsible bidder. (EC
17263, 17267)
All relocatables in use throughout the district
3.9 10 NR NR
meet statutory requirements. (EC 17292)
The district maintains a plan for the mainte-
3.10 nance and modernization of its facilities. [EC 8 NR NR
17366]
The annual deferred maintenance contribution
is made correctly. The district should annually
3.11 transfer the maximum amount that the district 6 NR NR
would be eligible for in matching funds from
the state.
The district actively manages the deferred
maintenance projects. The district should
review the five-year deferred maintenance
plan annually to remove any completed
3.12 projects and include any newly eligible 5 6 6 ❑
projects. The district should also verify that
the expenses performed during the year
were included in the state approved five-year
deferred maintenance plan.
The district maintains an appropriate structure
4.1 for the effective management of its construc- 7 NR NR
tion projects.
The identified subset of standards appears in bold print.
28
Facilities Management NA not applicable
NR not reviewed ❑ targeted for review
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
Change orders are processed and receive
prior approval from required parties before
4.2 3 3 3 ❑
being implemented within respective con-
struction projects.
The district maintains appropriate project re-
4.3 8 NR NR
cords and drawings.
Each Inspector of Record (IOR) assignment
4.4 5 5 5 ❑
is properly approved.
The district complies with formal bidding
5.1 5 6 6 ❑
procedures. (GC 54202, 54204, PCC 20111)
The district has a procedure for requests for
5.2 quotes/proposals. (GC 54202, 54204, PCC 2 2 2 ❑
20111)
The district maintains files of conflict-of-inter-
est statements and complies with legal require-
5.3 0 NR NR
ments. Conflict of interest statements should
be collected annually and kept on file.
The district ensures that biddable plans and
specifications are developed through its li-
5.4 10 NR NR
censed architects/engineers for respective
construction projects.
The district ensures that requests for progress
5.5 1 NR NR
payments are carefully evaluated.
The district maintains contract award/appeal
5.6 6 NR NR
processes. (GC 54202, 54204, PCC 20111)
The district complies with California Depart-
6.1 ment of Education (CDE) requirements relative 5 NR NR
to the provision of Special Education facilities.
The district provides facilities for its special
education programs that ensure equity with
6.2 other educational programs within the district 7 NR NR
and provide appropriate learning environments
in relation to educational program needs.
The district provides facilities for its special
education programs that provide appropriate
6.3 5 NR NR
learning environments in relation to education-
al program needs.
The identified subset of standards appears in bold print.
29
NA not applicable Facilities Management
❑ targeted for review NR not reviewed
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
An energy conservation policy should be
8.1 approved by the Governing Board and imple- 4 5 5 ❑
mented throughout the district.
Adequate maintenance records and reports
are kept, including a complete inventory of
supplies, materials, tools and equipment. All
employees required to perform maintenance on
school sites should be provided with adequate
8.5 8 NR NR
supplies, equipment and training to perform
maintenance tasks in a timely and professional
manner. Included in the training is how to
inventory supplies and equipment and when to
order or replenish them.
Procedures are in place for evaluating the work
quality of maintenance and operations staff.
The quality of the work performed by the main-
8.6 tenance and operations staff should be evalu- 2 NR NR
ated on a regular basis using a board-adopted
procedure that delineates the areas of evalua-
tion and the types of work to be evaluated.
Major areas of custodial and maintenance
responsibilities and specific jobs to be per-
formed have been identified. Custodial and
8.7 maintenance personnel should have written job 2 NR NR
descriptions that delineate the major areas of
responsibilities that they will be expected to
perform and will be evaluated on.
Necessary staff, supplies, tools and equip-
ment for the proper care and cleaning of the
school(s) are available. In order to meet ex-
8.8 pectations, schools must be adequately staffed 6 NR NR
and staff must be provided with the necessary
supplies, tools and equipment as well as the
training associated with the proper use of such.
Toilet facilities are adequate and main-
8.10 tained. All buildings and grounds are main- 6 8 8 ❑
tained. (CCR Title 5 § 631)
The district has developed a plan for attrac-
9.1 4 6 5 ❑
tively landscaped facilities.
The identified subset of standards appears in bold print.
30
Facilities Management NA not applicable
NR not reviewed ❑ targeted for review
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
The goals and objectives of the technology
plan should be clearly defined. The plan
should include both the administrative and
9.2 instructional technology systems. There 3 3 6 ❑
should be a summary of the costs of each
objective and a financing plan should be in
place.
The Governing Board shall provide a warm,
healthful place in which children who bring
9.3 2 3 4 ❑
their own lunches to school may eat their
lunch. (EC 17573, CCR Title 5 §14030)
The Governing Board of every school district
shall provide clean and operable flush toilets
9.4 6 8 8 ❑
for the use of pupils. (EC 17576, CCR Title 5
§14030)
The district has plans for the provision of
9.5 extended day programs within its respective 0 NR NR
school sites. (EC 17264)
All schools shall have adequate heating and
9.7 8 NR NR
ventilation.
All schools shall have adequate lighting and
9.8 6 NR NR
electrical service.
Classrooms are free of noise and other barriers
9.9 8 NR NR
to instruction. (EC 32212)
The learning environments provided within
respective school sites within the district are
9.10 6 NR NR
conducive to high quality teaching and learn-
ing.
Facilities within the district reflect the stan-
9.11 dards and expectations established by the 7 NR NR
community.
The district should have a plan to promote
10.1 2 3 6 ❑
community involvement in schools.
The identified subset of standards appears in bold print.
31
NA not applicable Facilities Management
❑ targeted for review NR not reviewed
Facilities Management
June Dec. June Focus
2003 2003 2004 for Dec.
Standard to be addressed
Rating Rating Rating 2004
Education Code Section 38130 establishes
terms and conditions of school facility use
by community organizations, in the process
10.2 requiring establishment of both “direct 1 1 1 ❑
cost” and “fair market” rental rates, specify-
ing what groups have which priorities and
fee schedules.
Districts should maintain comprehensive
10.3 records and controls on civic center imple- 0 1 1 ❑
mentation and cash management.
The identified subset of standards appears in bold print.
32
Facilities Management NA not applicable
NR not reviewed ❑ targeted for review