MUNICIPAL SERVICE REVIEW AND SPHERE OF INFLUENCE PLAN
FOR THE
DURHAM IRRIGATION DISTRICT
PREPARED BY THE BUTTE LOCAL AGENCY FORMATION COMMISSION
ADOPTED JUNE 6, 2019
RESOLUTION NO. 16 2018/19
This page intentionally left blank
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Table of Contents
District Data Sheet ................................................................................................................... 2
District Summary ....................................................................................................................... 4
DID Services ............................................................................................................................... 4
Municipal Service Review Factors for The Durham Irrigation District .............................. 4
Adequacy of Public Services ................................................................................................. 8
Facilities ...................................................................................................................................... 8
District Equipment .................................................................................................................. 10
Capacity ................................................................................................................................. 11
Quality ...................................................................................................................................... 13
Capital Improvements .......................................................................................................... 14
Revenues ................................................................................................................................. 17
Expenditures ............................................................................................................................ 19
DID Annual Budgets .............................................................................................................. 20
Budget Deficits ....................................................................................................................... 21
Annual Financial Audit/Financial Reports ......................................................................... 23
Future Challenges and Issues Related to Finances ......................................................... 25
DID Board of Directors ........................................................................................................... 27
DID Staffing.............................................................................................................................. 27
District Transparency ............................................................................................................. 28
Operational Efficiencies ....................................................................................................... 29
Future Challenges and Issues to Operational Efficiencies .............................................. 29
Potential Boundary Changes ............................................................................................... 30
Sphere of Influence Plan Review Factors for the Durham Irrigation District ................ 32
Sphere of Influence Findings and Recommendations .................................................... 40
LAFCO Adopting Resolution and Approved SOI Map .................................................... 41
Public Comments Received ................................................................................................ 44
Glossary ................................................................................................................................... 45
1
This page intentionally left blank
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
DISTRICT DATA SHEET
DURHAM IRRIGATION DISTRICT
Contact: Raymond Cooper, President of the Board of Directors
Address: 9418C Midway, Durham, CA 95938
Mailing Address: PO Box 98, Durham, CA 95938
Email: info@DIDwater.org
Phone: (530) 343-1594
Webpage: https://www.didwater.org
GOVERNING BOARD
Durham Irrigation District Board of Directors
Normal Board Meeting Date: Second Tuesday of each month at 6:00 p.m.
Board Meeting Location: District Office, 9418C Midway, Durham
FORMATION INFORMATION
The Durham Irrigation District was formed in 1948.
PURPOSE AREA SERVED
1. Enabling Legislation: California Water 1. Supervisorial District: 4
Code, Division 11, §20500 et seq. 2. No. of Parcels: 555
2. Authorized Services: Domestic Water 3. District Size: 506 acres
Service 4. Estimated Population: 1,471
3. Provided Services: Domestic Water 5. Location: Unincorporated
Service community of Durham and
the surrounding area.
6. Sphere of Influence: 506
FINANCIAL INFORMATION acres (coterminous with
Year End 2017 District jurisdictional
Revenues: $253,473 boundaries)
Expenditures: $311,561
Capital Assets 12/31/2017: $822,874 NOTES
1. Number of Customers: 459
Revenue Sources: 2. Number of Employees: 3
• Water Sales
• Meter Connection Fees
Interest
2
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Figure 1 - DID Jurisdictional Boundaries and Sphere of Influence
3
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
District Summary
The Durham Irrigation District (DID) was established in 1948 to serve the unincorporated
community of Durham and the surrounding area with domestic water service. The
District’s service area encompasses 506 acres (0.8 square miles) and approximately 555
parcels. The District’s current Sphere of Influence (SOI) is coterminous with the District’s
jurisdictional boundaries. The District has an estimated population of 1,471 with 459
service connections.
The services provided by the District were last reviewed in the Durham Irrigation Municipal
Service Review (MSR) adopted by the Butte Local Agency Formation Commission
(LAFCo) in 2006. The 2006 MSR contained numerous determinations regarding DID’s
operations, most notably “As of FY ending 2004 (the most recent audit available at that
time), revenues exceeded expenditures. Rates should continue to be re-evaluated as
necessary to ensure that they cover the costs of providing related services.”
As a result of the determinations contained in the 2006 MSR, the District underwent two
Rate Studies – First in 2011 and then again in 2018. The studies initiated a rate increase
that kept revenue above expenditures and allowed the District to create a fund for
needed capital improvements. The second study was approved at a California
Constitution Article XIII.D Section 6 hearing in November of 2018 with new rates going into
effect in January of 2019.
DID Services
The District is an independent special district (not part of any county or city) that provides
domestic water service to parcels within its service area.
Municipal Service Review Factors for The Durham Irrigation District
Pursuant to California Government Code §56430, in order to update a Sphere of
Influence (SOI) for a city or special district, the associated MSR must include written
determinations that address various factors regarding the ability of the subject agency
to provide services. The following provides an analysis of the seven categories or
components required by §56430 for the Municipal Service Review for the Durham
Irrigation District:
MSR FACTOR NO. 1: GROWTH AND POPULATION PROJECTIONS FOR THE AFFECTED AREA.
The District’s jurisdictional boundaries consist of the unincorporated community of
Durham and its surrounding area. There are no clear significant growth areas; the Butte
County General Plan zoning ordinance greatly limits the growth in the area. The Durham-
Dayton-Nelson Area Plan which is incorporated into the Butte County’s General Plan 2030
establishes area-wide land use policies that provide less potential for future development
than had been allowed under the former Durham-Dayton-Nelson Area Plan (D2N), which
governed the area prior to the adoption of the new Durham Area Plan. Any future
growth in the District will be dictated by requests for annexation submitted to, and
approved by, LAFCo.
4
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Smaller parcels comprising of approximately 456 acres within the District are used for
urban uses within the community core of Durham. Land uses within the District include
single-family residential uses, commercial uses, industrial uses, and public uses. There is
very little potential for new development within the boundaries of the District. A large
portion of the core community of Durham is zoned for medium and medium-high density
residential uses. However, the lack of a public sanitary sewer system in the Durham area
restricts the creation of smaller parcels or the construction of multiple dwellings on existing
developed parcels. The area of the District outside of the community core of Durham is
mostly zoned for agricultural uses on parcels with a minimum parcel size of 20 to 40 acres.
The following table provides population data for the unincorporated area of Butte
County, and for Butte County as a whole, for the years 2010 to 2018:1
Table 1 - Population Butte County
The above table shows that the population of the unincorporated area of Butte County
has decreased by approximately 2.4 percent since 2010. Most, if not all, of this population
decrease can be attributed to the annexations of a large number of developed parcels
to the cities within the county, primarily to the City of Chico.
The growth rate of Butte County as a whole for 2010 to 2018 was 3.6 percent, which is a
compound annual growth rate of approximately 0.35 percent. The population growth
rate during this period was lower than previous years due to the slowdown in the
economy and in the housing market that began in 2008.
In May 2019, the State of California Department of Finance released updated population
growth projections for all the counties within the state2. The population projection for
Butte County shows that by 2060 the county may have a population of 295,432. The 2060
projected population is approximately 22 percent above the county’s current
population, which represents an approximate compound annual growth rate of 1.03
percent.
Estimates Projections
2010 2019 2020 2025 2030 2035 2040 2045 2050 2055 2060
220,202 229,029 230,282 237,844 246,880 255,884 264,271 271,741 279,618 287,417 295,432
1 State of California, Department of Finance, E-4 Population Estimates for Cities, Counties, and the State, 2010-2019, with
2010 Census Benchmark. Sacramento, California, May 2019.
2 State of California, Department of Finance, P-1: County Population Projections (2010-2060). Sacramento, California,
March 8, 2017.
5
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Table 2 - California Department of Finance Population Projections for Butte County 2020-2060
The California Department of Finance reported that there are an approximate 2.65
persons per household in the Durham area (zip code 95938). With this figure the 2018
District population is projected to be 1,471 persons. The population within the DID service
area is expected to grow at a rate of approximately 1 percent a year, with most of that
growth occurring within the unincorporated community of Durham.
The following table shows estimated population projections for the DID service area.
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
1,471 1,485 1,500 1,515 1,530 1,546 1,561 1,577 1,592 1,608 1,624 1,641 1,657
Table 3 - Population Projections for Durham Irrigation District - 2018-2030
Population growth within the Durham area could be significantly greater than 1 percent
annually if a sanitary sewer system is constructed to serve the area. However, there are
no known plans for a sanitary sewer system to be constructed in the Durham area.
Figure 2 - Projected Population Growth 2018-2030
As population increases, and growth occurs within the District, service demands will
increase. Expansion of services is facilitated by increases in revenues due to rate
increases and the collection of connection and service fees from new development.
6
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
MSR DETERMINATION 1-1: POPULATION
The District has a current population of approximately 1,471 people.
MSR DETERMINATION 1-2: POPULATION GROWTH
The population served by DID is expected to grow at a rate of approximately 1
percent annually. Future population growth within the District is expected to
occur primarily within the Durham area.
MSR DETERMINATION 1-3: POPULATION GROWTH AND NEW SERVICE DEMANDS
There is very little potential for new development within the boundaries of the
District. However, as the population gradually increases, and growth occurs within
DID, service demands will increase. Expansion of services by DID is facilitated by
increases in revenues due to rate increases and connection and service fees from
new development.
MSR FACTOR NO. 2: THE LOCATION AND CHARACTERISTICS OF ANY DISADVANTAGED UNINCORPORATED
COMMUNITIES WITHIN OR CONTIGUOUS TO THE SPHERE OF INFLUENCE.
Disadvantaged unincorporated communities (DUCs) are defined by statute as inhabited
territory (meaning 12 or more registered voters) or, as determined by commission policy,
that constitute all or a portion of a community with an annual median household income
(MHI) that is less than 80 percent of the statewide annual MHI (Water Code Section
79505.5). The statewide MHI data is obtained from the US Census American Community
Survey (ACS) 5-Year Data: 2011 - 2015. California's MHI for this period was $61,818, and
80 percent of that is $49,454.
Median household income data is available at the U.S. Census block group mapping
level. Based upon the MHI data for the U.S. Census block groups within the boundaries
of the District, there are no identified communities within the District that qualify as being
a DUC. However, there are areas within the District, specifically islands of multi-family
housing and smaller single-family residences, which if analyzed separately from the tract
data, may potentially qualify as a DUC.
MSR DETERMINATION 2-1: DISADVANTAGED UNINCORPORATED COMMUNITIES
Per the Census tract data, the Durham community would not be considered a
DUC. There are areas within the Durham Irrigation District service area, specifically
islands of multi-family housing and smaller single-family residences, which if
analyzed separately from the tract data, may potentially qualify as a DUC.
7
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
MSR FACTOR NO. 3: PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES, ADEQUACY OF PUBLIC
SERVICES, AND INFRASTRUCTURE NEEDS OR DEFICIENCIES INCLUDING NEEDS OR
DEFICIENCIES RELATED TO SEWERS, MUNICIPAL AND INDUSTRIAL WATER, AND
STRUCTURAL FIRE PROTECTION IN ANY DISADVANTAGED, UNINCORPORATED
COMMUNITIES WITHIN OR CONTIGUOUS TO THE SPHERE OF INFLUENCE.
Adequacy of Public Services
As previously noted, DID provides the following services:
Domestic Water Services
DID provides water to customers utilizing three wells and an underground pipe system.
They currently have 459 customers. All service laterals beyond the water meter within the
District are maintained by private landowners.
Facilities
The District’s office is located at 9418C Midway, Durham. The District leases a suite for
$450.00 a month. The suite houses a small office and meeting space. The District has no
plans to make any significant improvements to their office.
The District Office is open on Thursdays from 8:00 am to 12:00 noon. However, the office
may be closed at times during these hours because the District staff may be out of the
office or in the field providing services. Most communications to the District come in the
form of phone calls to the main office and emails to the District email address
(durhamwater@att.net).
Figure 3 - Durham Irrigation District Office
The District owns three parcels of land on which the existing wells are located. It maintains
easements for facilities not within the public road system. The following pictures shows
the three Durham Irrigation District well facilities.
8
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Figure 4 - Durham Irrigation District – Well #3
Figure 5 - Durham Irrigation District – Well #4
9
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Figure 6 - Durham Irrigation District – Well #5
District Equipment
Due to budgetary constraints, the District operates with little overhead capital. The office
does have a computer, fixtures and supplies related to a small office operation. Until
recently, the District contracted with a Certified Drinking Water System Distribution
Operator who provided his own vehicle and tools used on the job. For this reason, the
District does not have or maintain all the necessary equipment or personnel to provide
all services required for continual operations, especially those requiring heavy
equipment, and therefore many projects must be contracted out to licensed providers.
Some examples of contracted work include repairs of existing infrastructure, installation
of new meters or valves, and well pump maintenance. The District Operator also oversaw
and inspected any work outside of his contractual scope of work performed by
contractors for improvements to District infrastructure. The District recently expanded the
scope of services that NorthStar Engineering currently provides to the District to include
management and operations of District facilities. NorthStar Engineering employees now
fill the position of District General Manager and District Water System Operator.
The District has three groundwater wells that supply the water required by District users.
Two wells have back up power to maintain full operations during outages. One well lacks
back up power, but this does not affect system capability as the other wells have
capacity to meet demands.
Portions of the water delivery conveyance system are aging and should be replaced in
the near future. However, the District has made and continues to make many
improvements to the well pumps and in the timing of deliveries, thus avoiding pressure
surges and line breaks. These improvements have extended the life of the existing piping
conveyance system, and typical pipeline breaks are now only caused by tree damage.
Limited portions of the District’s domestic water infrastructure lack shut off valves and
service in those areas must be interrupted to make repairs or new service connections.
10
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
The District is currently considering the purchase and use of a Supervisory Control and
Data Acquisition (SCADA) system to allow the remote monitoring and control of District
infrastructure.
Capacity
The District relies solely on groundwater for its supplies, which is pumped from its three
wells into a conveyance system owned by the District. The District has instituted many
upgrades and improvements over the last seven years to include installation of flow
meters, and now actual pumping data is readily available for each of the three wells.
In March 2008 the California Waterworks Standards were revised to include new
methodology for determining minimum required source capacity and proof that water
systems with fewer than 1,000 service connections had either storage capacity equal to
maximum daily demand, or additional source supply that could meet the demand.
Source capacity from any two of the District wells combined exceeds the maximum daily
demand, so the third well is considered an additional source of supply. Therefore,
distribution storage is not required at this time. The maximum pumping capacity of the
three wells is approximately 3.456 MGD (million gallons per day) while the average daily
use is 0.51 MGD or 15% of capacity. In 2018, an estimated 187 MG (million gallons) was
delivered.
Well pump #3 can deliver 800 gallons per minute (1.152 MGD)
Well pump #4 can deliver 500 gallons per minute (0.72 MGD)
Well pump #5 can deliver 1,100 gallons per minute (1.584 MGD)
DID Well Data for 2018
30.0
25.0
20.0
E
L
T
IT 15.0
S
IX
A 10.0
5.0
0.0
Jan Feb March April May June July Aug Sept Oct Nov Dec
Well #5 MG 0.7 0.8 0.8 0.9 2.8 3.6 1.6 1.2 2.2 1.8 1.5 1.1
Well #4 MG 3.1 4.6 3.7 6.2 10.9 11.8 11.3 10.5 10.5 9.9 7.2 3.6
Well #3 MG 3.5 3.5 3.1 4.0 4.9 7.6 14.2 14.0 7.5 5.7 3.9 3.2
Figure 7 - Well Data 2018
11
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
The district uses three active wells throughout the year - designated #3, #4, and #5.3 The
three wells are actuated by pressure settings. Generally, Well #4 is lead/primary with Well
#5 coming on as the pressure drops in the south side of town. Well #3 then only comes
on during high demand occurrences. When a fire was threatening structures near Well
#3 it was actuated to improve fire flow. Typical water pressure in the district is around 45
pounds per square inch to 60 pounds per square inch depending on location and
demand. At times the operator will switch the lead/primary well to make sure all three
main wells get used equally.
Figure 8 below illustrates the potential future demand of the District supply. The California
Department of Finance Population Projections for Butte County do not exceed a
compound annual growth rate of 1.03 percent. Based on the California Waterworks
Standards for calculating adequate maximum daily demand, the District has adequate
supplies to accommodate these growth projections.
Projected Water Demand 2015-2030
4
3.5
)
D
G 3
M
(
y
a 2.5
D
r
e
P 2
s
n Demand
o
lla
1.5 Pumping Capacity
G
n
o
illiM 1
0.5
0
2015 2020 2025 2030
Year
Figure 8 - Capacity vs. Demand
During historical periods of drought, the overall water table in the vicinity has dropped,
but the District continued to provide uninterrupted service to all of its customers. In a
typical water year, demand for water from the District peaks in the months of May
through October during the height of the irrigation season. There are no proposed or
planned changes in system capacity, and water supplies are determined to be
adequate to serve projected demand within the District boundaries. To ensure that the
District continues to meet the projected water demand, upgrade and improvement of
the District’s aging infrastructure will be required, but which is not adequately funded
3 Wells #1 and #2 have been abandoned.
12
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
under the current rate structure. As noted above, the new rate structure was approved
by the district’s board of directors in November 2018.
Quality
In California, drinking water quality standards are defined and regulated under the
California State Drinking Water Act. The District is classified as a Community Water System,
and therefore is required to utilize a State Certified Operator for the operation of the
water system. The District Water System Operator engaged by the District is certified and
monitors the delivery system functionality and water quality on a daily basis. The District
Water System Operator performs all of the water quality sampling and compiles the data
results for required reporting to the State Water Resources Control Board, and generates
the required Consumer Confidence Reports, which provide consumers with current water
quality data. Consumer Confidence Reports (CCR) are available for review through the
District office. The following table outlines the list of constituents included in the CCR.
Constituent Typical Source of Contaminant
Total Coliform Bacteria Naturally present in the environment.
Fecal Coliform or E. coli Human and animal fecal waste.
E. coli Human and animal fecal waste.
Lead Internal corrosion of household water plumbing
Copper Internal corrosion of household plumbing.
Sodium Salt naturally present in the water.
Hardness Sum of polyvalent cations present in the water.
Hexavalent Chromium Discharge from manufacturing facilities.
2, 4, 5-T Residue of banned herbicide.
Fluoride Erosion of natural deposits; water additive which
promotes strong teeth.
Uranium Erosion of natural deposits.
Nitrate as N03 Runoff & leaching from fertilizer use; leaching
from septic tanks; erosion of natural deposits.
Gross Alpha Erosion of natural deposits.
Radium 226 and 228 Erosion of natural deposits.
Chloride Runoff/leaching from natural deposits.
Color Naturally occurring organic material.
Foaming Agents Municipal and industrial waste discharges.
Specific Conductance Substances that form ions when in water.
Sulfate Runoff/leaching from natural deposits.
Total dissolved solids Runoff/leaching from natural deposits.
Turbidity Soil runoff.
Table 4 - Consumer Confidence Reports Constituents
District water is treated with chlorine by injection at the wells prior to delivery. The District
remains focused on detecting and reporting lead levels as it works to complete an
inventory of lead user service lines. With the passage of Assembly Bill 746 the state of
California has required that by July 2019, community water systems conduct lead
sampling of drinking water in all public K-12 schools constructed before 2010. The
community water systems are responsible for the costs associated with collecting drinking
water samples, analyzing them and reporting results through this new program. In August
13
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
2018, Durham Irrigation District provided services for sampling of drinking water at 10
locations throughout Durham Unified School District campuses. The laboratory returned
test results with “non-detectable levels” from all ten sampling locations. According to the
U.S. Environmental Protection Agency, there are no safe levels of lead, and long-term
exposure to lead causes a number of health problems, especially for pregnant women
and young children. California rarely has any occurrences of naturally occurring lead in
drinking water sources, but it may become present when water passes through older
plumbing fixtures or components associated with service lines and home plumbing
containing lead. Durham Irrigation District is committed to the health of the school
children and community at-large that it serves and will continue providing high quality
drinking water, but cannot control the variety of materials used in plumbing components.
DID’s facilities were last inspected by the State Water Resources Control Board, Drinking
Water Field Operations Branch, on May 16, 2017, and no deficiencies were found.4 DID
has not had any water quality violations since 2002, when methyl tert-butyl either (MTBE)
were detected (Violation No. 2003-221005).5 This violation appears to have been cleared
by the State Water Resources Control Board in February 2018 (Enforcement Action No.
2018-9621011).
Capital Improvements
The DID Board of Directors in conjunction with the District Operator and the District
engineer have developed and maintain and update as necessary a list of capital
improvement projects. These proposed projects focus on eliminating existing
deficiencies within the system and increasing the reliability of the system for the current
users. The proposed capital improvement projects are included in a Capital
Improvement Plan (CIP) that will be adopted by the District in conjunction with this
MSR/SOI document. The following is a brief summary of proposed capital improvement
projects.
Lead Service Pipe Study:
Section 116885 of the California Health and Safety Code (H&S Code, Lead Service Lines
in Public Water Systems – Senate Bill 1398) requires all public water systems to compile an
inventory of known partial or total lead user service lines in use in its distribution system.
The deadline to compile the inventory was July 1, 2018. Although the District has
completed the required survey questionnaire and submitted the information to the
RWQCB as required, it has not completed the inventory.
Based on age, the District has identified existing pipelines within the system that have the
potential of containing lead. The District currently has several remaining flat rate service
connections within the oldest part of the system. After applying for and receiving grant
funds to install 42 meters on these services in the fall of 2019, the District intends to examine
4 Information on the site visit was obtained from:
https://sdwis.waterboards.ca.gov/PDWW/JSP/SiteVisits.jsp?tinwsys_is_number=95&tinwsys_st_code=CA&be
gin_date=&end_date=&counter=0
5 Information on the violation was obtained from:
https://sdwis.waterboards.ca.gov/PDWW/JSP/Violation.jsp?tinwsys_is_number=95&tinwsys_st_code=CA&tm
nviol_is_number=4329&tmnviol_st_code=CA
14
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
service line types exposed during the installation process. Once the metering project is
complete, an inventory will be prepared and submitted to the Division of Drinking Water.
If it is determined that any service lines contain lead, the District will prepare a schedule
to replace those.
Wharf Hydrant Replacement:
The existing hydrants located in the central service area are primarily wharf hydrants that
were installed during the installation of the original water system and are approximately
50-75 years old. A total of 27 wharf hydrants have been identified for replacement or
abandonment. A majority of these hydrants do not include isolation valves and are
constructed with old steel pipe. The replacement of these hydrants causes a significant
impact on the surrounding users as the entire service line has to be shut down.
Valve Replacement:
There are approximately 70 valves located throughout the existing water system. The
valves installed in the central service area are approximately 50-75 years old and the
types of valves are unknown. These valves will allow for isolation of service areas that
currently cannot be isolated if a repair needs to be made. It is proposed that the
remaining valves within the central service area should be replaced in conjunction with
adjacent pipeline replacement projects, as discussed below.
Meters:
State law requires all water providers to convert flat-rate water customers to metered
services by 2025. The District currently has 141 flat rate water customers that need to be
converted to a metered service to comply with the State law. The District is considering
incentives to induce these customers to install meters prior to 2025.
The reading of meters is a significant operational cost for the District that is then passed
on to the consumer in their water rates. The conversion of the standard meters to an
automatic meter reading system is a way to reduce the operational cost for the District
and a way to provide better customer service to their users. The District is currently seeking
grant funding to begin a meter replacement program. Installations of automatic meters
on parcels not currently metered may begin as soon as spring of 2019.
Pipeline Improvements:
Pipelines in the original central service area are approximately 50-75 years old. These
pipelines range from 1 to 6 inches in diameter and are comprised of steel, asbestos
cement, galvanized steel, and cast iron. Many of these pipelines have reached the end
of their useful life and need to be replaced as age results in increasing numbers of leaks,
water loss and service disruption. The District has prioritized replacement of these lines
according to the need and age for many of these pipelines but reserves the right to
adjust the priority in the case of an emergency or failure. Upon replacement, the District
intends to increase the size of each line to increase the available flow and pressure for
the users. It intends to replace approximately 11,350 lineal feet of pipeline and 256
service connections from the water main to the meter in the near future.
There have been three locations within the existing system that have been identified as
having a gap or missing section of water main. Infilling these gaps will provide redundant
15
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
water supply to all users south of Durham-Dayton Highway and will increase the available
flow and pressure for the users.
Most customers located along Durham-Dayton Highway have service connections
located in their backyard served off of water mains that run in the adjacent easements.
It is difficult to maintain the water lines located in the easements as access is limited. It is
recommended that the water mains that are located in these easements be
abandoned and the services be connected to the water main located in Durham
Dayton Highway.
Well Improvements:
The priority well infrastructure improvements are all for Station #3. The building housing
the well pump needs to be replaced. The existing pressure tank is approaching the end
of its useful life and should be significantly rehabilitated or replaced. Lastly, a new 6” sand
filter should be installed in order to maximize the operational capacity of the well, pump
and conveyance system.
MSR DETERMINATION 3-1: ADEQUACY OF PUBLIC SERVICES
The District has sufficient facilities and resources to provide domestic water
services to its existing service area and in its current sphere of influence and any
contemplated expansion thereof. The District should continue to provide facility
maintenance and upgrades and consider a public outreach effort promoting
water conservation.
MSR DETERMINATION 3-2: ADEQUACY OF PUBLIC SERVICES – CAPACITY
The District has provided adequate supplies of water to its service area for day to
day needs during years of normal precipitation as well as through the recent
prolonged drought extending from 2014 to 2016. The District’s water supply is
sufficient to accommodate the projected growth within the current district
boundaries. Expansion of the District boundaries may require the drilling of an
additional well to be able to provide adequate water supply to the expanded
area.
MSR DETERMINATION 3-3: ADEQUACY OF PUBLIC SERVICES - WATER QUALITY
The District’s water meets all required state and federal water quality standards.
16
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
MSR DETERMINATION 3-4: ADEQUACY OF PUBLIC SERVICES - INFRASTRUCTURE NEEDS OR DEFICIENCIES
The District has aging water supply infrastructure that must be repaired or
replaced as necessary. The approved Capital Improvement Program provides
guidance to the needs of the District.
MSR DETERMINATION 3-5: ADEQUACY OF PUBLIC SERVICES - INFRASTRUCTURE NEEDS OR DEFICIENCIES
The District has not met the July 1, 2018 to complete an inventory of lead service
lines as required by law. Given the health danger of lead, the District should
prioritize the inventory and replacement of lead service line infrastructure.
MSR FACTOR NO. 4: FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES.
This section analyzes the financial structure and fiscal viability of the District. Included in
this analysis is the consideration of revenue sources, amount of revenue, stability of
revenues, and expenditure sources.
Revenues
The District receives revenue from two main sources:
Water Sales
At Year End 2017, approximately 99 percent ($253,473) of DID’s revenues were
received from water sales. Currently, the District has 141 flat rate services and 318
metered services. The current rates, which were adopted by DID in November 2018
and became effective on January 1, 2019, are as follows:
17
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Figure 9 - DID Service Rates 2019
Meter Installations
At year-end 2017, approximately 1 percent ($1,980) of DID’s revenues were received
from meter installations. The number of meters installed within the District varies from
year to year. The District has little to no growth, so revenue projections have little to
do with this revenue stream.
18
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Revenues for the District steadily increased from 2011 to 2016. Revenue for the District at
year end 2017 was $253,273. District revenues rose dramatically after the District
implemented the Rate Study of 2011 in order to bring water sales in-line with current
expenses and are expected to increase again with the recently approved rate structure.
DID REVENUES- YEAR END 2006 TO 2017
$257,243
$252,620
$194,830 $270,984 $253,473
$240,306
$140,855
$136,370 $135,185 $132,029
$164,730
$142,679 $136,885
$123,942 $136,594
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Figure 10 - DID Revenues
Expenditures
Total operating and capital expenditures for the District for Year 2017 were $311,561.
Expenditures for DID generally consist of repairs and maintenance, power, water
treatment, transmission and distribution, and administration. In Year 2017, administration
accounted for 48 percent ($149,772) of the District’s expenditures and power accounted
for 17 percent ($53,979) of the District’s expenditures.
As shown in the table below the District’s expenditures rose dramatically in 2016 and 2017
due to the expense of updating one of the system wells.
19
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
DID EXPEDATURES- YEAR END 2008 TO 2017
$311,561
$259,184
$170,455
$179,969 $164,649
$148,421 $170,005
$126,098
$153,166 $179,540
$158,824 $177,656
$128,078 $130,436 $150,609
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Figure 11 - DID Expenditures
DID Annual Budgets
The District operates on a calendar year for its fiscal reporting. The District is considering
changing its fiscal year to one ending June 30th to be consistent with State and County
fiscal years.
DID maintains a fund balance, and as of December 31, 2016, the District had $317,384
in available (unappropriated) funds. The following table shows the District’s available
fund balance from Years 2008 through 2016.
DURHAM IRRIGATION DISTRICT
UNAPPROPRIATED FUND BALANCES
As of 12-31-17 $228,436
As of 12-31-16 $317,384
As of 12-31-15 $350,299
As of 12-31-14 $252,440
As of 12-31-13 $173,558
As of 12-31-12 $141,235
As of 12-31-11 $101,481
As of 12-31-10 $94,024
As of 12-31-09 $122,829
As of 12-31-08 $117,400
Table 5 - DID Unappropriated Fund Balances
For public agencies like DID, unappropriated fund balances are not just money in the
bank; they are fundamental resources for ensuring reliable core services and community
security.6 Public agencies designate money toward savings to balance their budgets,
6Special District Reserve Guidelines - A Guide to Developing a Prudent Reserve. Second edition. California
Special Districts Association. 2013.
20
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
respond to emergencies, keep rates affordable, maintain current infrastructure, and plan
for future needed capital improvements. The following are the benefits of a public
agency maintaining an adequate level of unappropriated fund balance:
Balancing Budgets – Over the course of the fiscal year, fund balances help
balance the ebb and flow of revenues versus expenditures.
Emergency Expenditures – In the event of a disaster, districts cannot afford not to
have savings readily available to quickly repair critical local infrastructure and
bring core services back online.
Affordable Rates – With appropriate savings, special districts are able to use
resources wisely and smooth out the highs and the lows of volatile economic
conditions, rather than spend their entire surplus and then seek new revenue or
jeopardize services.
Infrastructure Maintenance – Reserves mean pipes are fixed and worn equipment
is replaced when necessary without going back to ratepayers for funds to pay for
such routine upkeep and maintenance.
Planning for the Future – A long-term, thoughtful approach to public infrastructure
requires the foresight to plan and save for future needs.
The District’s unappropriated fund balance has varied significantly over the years in
response to unanticipated expenses, budget deficits, and reduced revenues. The District
should endeavor to increase the unappropriated fund balance every fiscal year to
ensure that there is adequate funding available for any unforeseen circumstances.
Budget Deficits
As shown in the following table and graph, DID experienced budget deficits (where
expenditures exceeded revenues) from 2006 to 2010. The following table and chart show
the revenue and expenditures for these fiscal years and the revenue/expenditure
variances.
Variance
Fiscal
Revenues Expenditures Favorable
Year
(Unfavorable)
2006 $135,185 $148,421 ($13,236)
2007 $142,679 $158,824 ($16,145)
2008 $140,855 $170,005 ($29,150)
2009 $136,885 $150,609 ($13,724)
2010 $132,029 $179,969 ($47,940)
2011 $164,730 $153,166 $11,564
2012 $194,830 $164,649 $30,181
2013 $240,306 $177,656 $62,650
2014 $252,620 $170,455 $82,165
2015 $270,984 $179,540 $91,444
2016 $257,243 $259,184 ($1,941)
2017 $253,473 $311,561 ($58,088)
Table 6 - DID Budget Deficits
21
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
DID REVENUE AND EXPENDATURES - YEAR END 2006
TO 2017
$350,000
$300,000
$250,000
$200,000
Expendatures
$150,000 Revenue
$100,000
$50,000
$0
Figure 12 - Revenue and Expenditure Comparison
Budgets are meant to balance revenues and expenditures so that a special district can
provide needed services with the resources available. However, the reality is that
budgets will rarely work out precisely as planned, leading to operating deficits (when
expenditures exceed revenues) or operating surpluses (when revenues exceed
expenditures.) As long as these deficits or surpluses are minor or intermittent, they do not
constitute a material problem for a local government and should not be cause for
concern. It is when there is a persistent pattern of larger surpluses or deficits that there
should be concern about the budgeting practices of the agency.7
An agency experiencing a budget deficit can use fund balance or other reserves, if
available, to balance the budget. However, using the fund balance is a one-time course
of action that cannot fix a structural imbalance. A district experiencing continuous
budget deficits may be having financial difficulties that need to be identified and
corrected. If budget deficits cannot be correct, a district may have to reduce service
levels if new sources of funding cannot be obtained.
From 2006 to 2009 the District contracted with California Water Service Co. – Chico for
water distribution, testing, and maintenance services. During this time period the District
had an unfavorable variance between revenues and expenditures. In 2010, the District
commissioned a fee study to analyze its water rates and connection fees in light of these
variances. The District had not raised rates in 11 years. As a result, the District
implemented a rate and fee increase at that time effective April 1, 2011. As shown in
Table 6 and Figure 12 above, the increase brought the District out of its budget deficits.
(In 2016 and 2017 the budget deficit can be attributed to the upgrading of facilities at a
system well.)
7 Citizens’ Guild to Local Budgets, Office of the New York State Comptroller-Division of Local Government
and School Accountability. 2010.
22
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Annual Financial Audit/Financial Reports
State law requires that every public agency retain the services of a certified public
accountant to prepare that agency’s annual financial audit. An audit involves
performing procedures to obtain audit evidence about the amounts and disclosures in
an agency’s financial statements.
The District’s financial statements include all transactions for which the District is financially
accountable. The procedures selected depend on the auditor’s judgment, including
the assessment of the risks of material misstatement of the financial statements, whether
due to fraud or error. In making those risk assessments, the auditor considers internal
control relevant to the entity’s preparation and fair presentation of the financial
statements to design audit procedures that are appropriate in the circumstances, but
not for the purpose of expressing an opinion on the effectiveness of the entity’s internal
control. An audit also includes evaluating the appropriateness of accounting policies
used and the reasonableness of significant accounting estimates made by
management, as well as evaluating the overall presentation of the financial statements.
The District performs the annual audits in compliance with the discussion above. The
audits performed from 2010 to 2017 did not identify any deficiencies. However, the
District’s Annual Financial Report for 2009 found one deficiency in internal control and
one significant deficiency in the internal control of financial reporting. A deficiency in
internal control exists when the design or operation of a control does not allow
management or employees, in the normal course of performing their assigned functions,
to prevent, or detect and correct misstatements on a timely basis. A significant
deficiency is a deficiency, or a combination of deficiencies, in internal control that is less
severe than material weakness, yet important enough to merit attention by those
charged with governance. As identified in the District’s comprehensive financial report
for 2009, the weaknesses found in the District’s internal control of their finances were:
Significant Deficiency 2009-1
Internal Control- Segregation of Duties
Condition
Currently the District only has one individual who maintains the accounting and
reporting records.
Criteria
Sufficient segregation of duties is needed to be in place by the District in order to have
good internal controls over financial accounting and reporting.
Cause
Due to the small size of the District, there is not enough need to have more than one
individual in the accounting department. As a result, this individual is responsible for
maintaining and handling all of the accounting transactions.
Effect
Failure to have sufficient segregation of duties could result in greater risk of fraud and
errors in financial accounting and reporting.
23
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Recommendation
We recommend that the District review areas that need additional segregation of
duties and consider involving a member of the board to oversee and be responsible
for those areas to strengthen internal controls.
Management's Response
The District is unable to implement full segregation of duties due to the small size of
the organization but will consider implementing additional internal controls to help
compensate for this deficiency.
Current Status
The District is now reviewing the manner in which the District is administering and
managing its business and operations with an eye towards improving such through
new and enhanced equipment and computer technology, including software better
tailored for its needs, new and updated policies and procedures resulting in more
efficient management and reporting of business and financial transactions, and
obtaining third party preparation of monthly and annual financial statement.
Deficiency 2009-2
Internal Control- Financial Statement Preparation
Condition
Financial statements are not being prepared in accordance with GAAP.
Criteria
The controller lacks the knowledge and skills necessary to apply Generally Accepted
Accounting Principles (GAAP) in preparing the District's financial statements.
Cause
The District's bookkeeper has not been sufficiently trained in financial reporting under
GAAP.
Effect
The financial statements are not properly presented to be audited and have to be
adjusted during the audit.
Recommendation
We recommend additional training be provided to the bookkeeper in the area of
financial accounting and reporting under GAAP.
Management's Response
The District's bookkeeper works only part-time and it would not be cost effective to
provide additional training, but consideration will be made to use an outside
consultant to assist with the financial reporting.
Current Status
Assistance was provided and the financial statements have met the auditor’s needs
in years since. The steps now being considered by the District as discussed above
should remedy this concern.
24
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Future Challenges and Issues Related to Finances
The Capital Improvement Program for DID creates a future financial challenge for the
District. The proposed projects focus on eliminating existing deficiencies within the system
and increasing the reliability of the system for the current users. The cost associated with
the proposed capital improvements totals over $3.9 million dollars. The District’s current
rates cannot support these improvements and the District is currently searching for grant
funding and/or alternative funding sources.
MSR DETERMINATION 4-1: FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES - REVENUE
The rate increase that went into effect April 1, 2011, brought the District out of its
budget deficits and it now operates with a balanced budget. The District
adopted new rates in November 2018, which became effective on January 1,
2019. The new fees will increase the District’s revenue flow, helping to prevent
revenue shortfalls.
MSR DETERMINATION 4-2: FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES - EXPENDITURES
Normal expenditures for the District include contracting services provided by
NorthStar Engineering, office expenses, and occasional purchases of new
equipment. The District’s expenditures do not appear to be excessive and are
necessary to provide efficient and effective water services.
MSR DETERMINATION 4-3: FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES – FUND BALANCE
As of December 31, 2016, the District’s General Fund had an unappropriated fund
balance of $317,384 which is available for District operations. The District should
endeavor to increase the unappropriated fund balance every fiscal year to
ensure that there is adequate funding available for any unforeseen
circumstances.
MSR DETERMINATION 4-4: FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES – FINANCIAL AUDIT
The District’s Annual Financial Report for 2009 found one deficiency in internal
control and one significant deficiency in the internal control of financial reporting.
Measures taken by the District have resulted in no additional deficiencies being
noted. The District should continue to ensure that all future financial audits are
prepared for each fiscal year in a timely manner consistent with State law and
with general accounting and financial practices.
25
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
MSR DETERMINATION 4-5: FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES – FUTURE FINANCIAL
CHALLENGES
The Districts proposed Capital Improvement Projects exceed $3.9 million dollars
and cannot be financed under the existing rate structure. The District should be
very transparent to the community about this critical need and consider rate
increases and actively seek grant funding or other sources of funding to help
facilitate these improvements.
MSR FACTOR NO. 5: STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES.
The Division of Drinking Water (now under the State Water Resources Control Board) has
for years encouraged voluntary consolidations of public water systems in order to provide
high quality water supply. The District has worked with both the Durham Recreation and
Park District and the Durham Unified School District to consolidate the provision of water
services and provide consistent high-quality service delivery to both Districts. The District
is willing to work with any other public water system located within its service area to
consolidate in the future.
Aside from cooperative water service opportunities, the District may also benefit from
considering other shared resources opportunities with all other special districts in the
Durham area, such as Durham Recreation and Park District, County Service Area No. 37
(Street Lighting), Durham Mosquito Abatement District and Durham Mutual Water
Company. As Durham is a small, close knit community and the above districts all have
very small staff and limited resources, there is likely some benefit to the consideration of
shared administrative functions and other logistical benefits such as common public
facilities to improve public access.
MSR DETERMINATION 5-1: STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
The District is now the service provider for both DPRD and DUSD, having taken over
and modified their existing water systems. The District has entered into
consolidation agreements with both DPRD and DUSD in order to provide
improved delivery of high-quality supply.
MSR DETERMINATION 5-2: STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
The District may benefit from shared resources with other local water districts and
is encouraged to consult with other local districts to improve overall service
delivery efficiencies in the Durham community.
26
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
MSR FACTOR NO. 6: ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING GOVERNMENTAL
STRUCTURE AND OPERATIONAL EFFICIENCIES.
DID Board of Directors
Pursuant to Division 11 (Section 20848) of the California Water Code, and with the original
petition to the Butte County Board of Supervisors, a three-member Board of Directors is
responsible for overseeing the operations of the District. The Board of Directors is
responsible for appointing the District Operator.
Each director must be a voter and landowner in the District. Directors are elected by
voters who are residents of the District and serve four-year terms.
Each Board member receives $100 per month. Regular meetings of the Board are held
at 6:00 pm on the second Tuesday of each month at the District’s office at 9418C
Midway, Durham. The Board is responsible for compliance with the provisions of the Brown
Act and obtains legal services from the John Jeffery Carter Law Office. Meeting
announcements are posted at the District office. Generally, very few members of the
public attend Board meetings.
Public notices by the District are published in the Chico Enterprise-Record and/or
included with monthly bills. Past minutes are available at the District office. When the
Board does not have a quorum, action items are carried over to the next meeting, with
the exception of authorizing payment of reoccurring bills. The president of the Board is
responsible for compliance with the Brown Act. District officials noted that the current
sphere of influence should be expanded so development in areas immediately adjacent
or near the District’s current service boundaries is occurring, including the Black Diamond
Holdings, LLC, Keeney, and Birchord projects.
The current DID Board of Directors are:
Position Trustee Name Term Ends
President/General Manager Raymond Cooper 2020
Director Matt Doyle 2020
Director Kevin Phillips 2022
DID Staffing
Until recently, the District day-to-day business was managed by the District Operator, who
was a private consultant hired by the DID Board of Directors. The District Operator had
been with the District for over 7 years but retired at the beginning of April 2019. Instead
of hiring a new District Operator, the District Board of Directors expanded the scope of
services already being provided to the District by NorthStar Engineering to now include
operation and maintenance of District facilities. NorthStar Engineering personnel now fill
the following District positions:
27
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
General Manager
Water System Operator
Meter Reader
The management structure of DID is very simple and reasonable for the type of
operations undertaken by the District. No alternative structures or reorganizations of staff
would result in more efficient operations, and the existing structure is considered
appropriate.
District Transparency
Governmental transparency promotes accountability and provides information for
citizens about what their government is doing. A public agency’s transparency is
necessary to provide the residents of the agency a thorough knowledge of the services
the agency provides, how it operates, how and by who the agency is governed, and
the financial status of the agency. Information on an agency should be easily accessible.
The District’s transparency is very limited, which makes it difficult for the residents of the
District to obtain information on the District. As required by State law, the District does
provide notice of upcoming Board meetings by posting a notice at the District office.
Board meeting minutes, and other information, can be obtained through the District
General Manager. All of these measures do require residents to make an effort to either
attend District Board meetings or visit the District office.
To provide for greater transparency, many special districts within California have websites
that allow for easy access to district services, information and documents.
Approximately 50 percent of the special districts within California have a website and the
primary reasons that districts do not have a website include money, personnel, legal
requirements, and no penalties for not having a website.
DID recently created a website (https://www.didwater.org) that provides information
about the District, including Board of Directors information, staff information, meeting
agendas, water rates, and water quality reports. The District should consider adding
additional information to their website, including:
Board of Directors meeting minutes
Adopted annual budget
Financial audits/reports
Map of the District
District policies and regulations
List of enterprise systems (SB 272)
Financial Transaction Reports
Compensation Reports
28
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Operational Efficiencies
The District is exposed to various risks of losses related to torts; theft of, damage to, and
destruction of assets; errors and omissions; injuries to employees; and natural disasters.
The District transfers risks that may arise from these and other events through the purchase
of property and liability insurance through the Special District Risk Management Authority
(SDRMA), an intergovernmental risk sharing Joint Powers Authority. The District carries
general and auto liability coverage, employee dishonesty coverage, property loss, and
boiler and machinery coverage. The District also maintains worker’s compensation
insurance through the State Compensation Insurance Fund.
Future Challenges and Issues to Operational Efficiencies
State law requires all water providers to convert flat-rate water customers to metered
services by 2025. The District currently has 141 flat rate water customers that need to be
converted to a metered service to comply with the State law.
The reading of meters is a significant operational cost for the District that is then passed
on to the consumer in their water rates. The conversion of the standard meters to an
automatic meter reading system is a way to reduce the operational cost for the District
and a way to provide better customer service to their users.
MSR DETERMINATION 6-1: OPERATIONAL EFFICIENCIES
The District is a member of the SDRMA to efficiently cover the Districts insurance
needs.
MSR Determination 6-2: Cost Avoidance Measures
The District utilizes appropriate cost avoidance measures in its operations,
including contracting out services which would be too costly for the District to
provide. Currently, revenues exceed expenditures; thus, no other forms of cost
avoidance are warranted.
MSR DETERMINATION 6-3: TRANSPARENCY - WEBSITE
The District is to be commended for recently creating a website, which will greatly
increase the District’s transparency. The District should consider adding additional
information about the district to their website, including, financial information such
as budgets and financial audits, a map of the District, District policies and
regulations, list of enterprise systems (SB 272), and compensation reports.
29
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
MSR DETERMINATION 6-4: TRANSPARENCY - IDENTIFICATION OF DISTRICT OFFICE
The Durham Irrigation District maintains an office at 9418C Midway, Durham,
California 95938. Its office hours are Thursdays from 8:00 am to 12:00 noon.
MSR DETERMINATION 6-5: OPERATIONAL EFFICIENCIES
The District has one part-time General manager, one part-time Water System
Operator, and one part-time Meter Reader. The District currently contracts with
NorthStar Engineering to staff these positions. The overall management structure
of DID is sufficient to perform basic services to the District.
MSR DETERMINATION 6-6: FUTURE CHALLENGES TO OPERATIONAL EFFICIENCIES
The District has 141 flat rate water customers that will need to be converted to
metered services prior to 2025. This conversion is State mandated. At the time of
this conversion it is recommended to convert the District from standard meters that
require monthly readings by District staff to automatic meters that can be read
with limited staffing. The District is now considering providing incentives to induce
flat rate customers to install meters prior to 2025.
MSR FACTOR NO. 7: ANY OTHER MATTER RELATED TO EFFECTIVE OR EFFICIENT SERVICE DELIVERY, AS
REQUIRED BY COMMISSION POLICY.
Potential Boundary Changes
Over the last ten years there have been several proposed subdivisions within the Durham
area but outside of the Durham Irrigation District boundary and Sphere of Influence (SOI).
These proposed subdivisions have mostly proposed the use of on-site community water
systems or private wells but are within a distance that DID could provide service. In these
cases, DID has reviewed service options with the applicants and the projects have not
moved forward. In the future DID would like to be able to provide service and orderly
development within the community of Durham.
As a part this MSR/SOI Update the District proposes that 63 parcels, totaling
approximately 280.1 acres be added to the District. There are two separate areas
proposed to be added to the District’s SOI:
1. A 21.5-acre area, consisting of six parcels (one of which is owned by DID) generally
located on the southwest border of the District, between Holland Avenue and
Goodspeed Street, south of Serviss Street; and,
2. A 258.5-acre area, consisting of 57 parcels, located on the east border of the
District, generally between the Union Pacific Railroad tracks to the west and Butte
Creek to the east.
30
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
The area proposed to be added to DID’s Sphere of Influence is shown on Figure 13,
located on the following page.
MSR DETERMINATION 7-1: POTENTIAL BOUNDARY CHANGES
An increase in the SOI will provide DID the ability to provide water services to new
developments in an orderly and efficient manner and demonstrate a public
policy preference for public water systems to serve new development within the
community of Durham.
31
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Sphere of Influence Plan Review Factors for the Durham Irrigation District
The Durham Irrigation District currently encompasses approximately 506 acres of land in
the unincorporated area of Butte County. The 506 acres includes 555 parcels and the
adjacent road right-of-way. The District’s existing Sphere of Influence is coterminous with
the District’s jurisdictional boundaries
Figure 13 - Proposed DID Sphere of Influence
32
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
The District is also located within the Durham-Dayton-Nelson Area Plan boundaries, which
was adopted in 1992 and incorporated into Section I of the Area and Neighborhood
Plans Element of the Butte County General Plan 2030. The General Plan establishes area-
wide land use policies for this area and designates it as the “Durham Urban Reserve”
area. The District is proposing to add some of this area to its SOI. If such expansion of the
SOI is approved, 60 parcels and adjacent road right of ways, totaling 280 acres will be
added to its SOI. Therefore, all parcels proposed to be added to the District’s SOI as well
as the existing District boundaries would be located within the Durham Urban Reserve
Area.
Figure 14 - D2N Area Map
33
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
There are numerous factors to consider in reviewing a SOI Plan, including current and
anticipated land uses, facilities, and services, as well as any relevant communities of
interest. Updates generally involve a comprehensive review of the entire SOI Plan,
including boundary and SOI maps and the District’s MSR. In reviewing an agency’s
sphere, the Commission is required to consider and prepare written statements
addressing five factors enumerated under California Government Code Section
56425(e), as listed below.
1. The present and planned land uses in the area, including agricultural and open
space lands;
2. The present and probable need for public facilities and services in the area;
3. The present capacity of public facilities and adequacy of public services which
the agency provides, or is authorized to provide;
4. The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency; and,
5. For an update of an SOI of a city or special district that provides public facilities or
services related to sewers, municipal and industrial water, or structural fire
protection, the present and probable need for those public facilities and services
of any disadvantaged unincorporated communities within the existing sphere of
influence.
SOI FACTOR NO. 1: THE PRESENT AND PLANNED LAND USES IN THE AREA, INCLUDING AGRICULTURAL AND
OPEN-SPACE LANDS.
As was noted previously, the Durham Irrigation District (DID) was established in 1948 to
serve the unincorporated community of Durham and the surrounding area. DID’s
jurisdictional boundaries consist of the unincorporated community of Durham and the
surrounding area. There are no clear significant growth areas; zoning restrictions limit the
growth in the area. The Durham-Dayton-Nelson Area Plan established area-wide land
use policies that provide less potential for future development than had been allowed
under the former Durham Area Plan, which governed the area prior to the adoption of
the Durham-Dayton-Nelson Area Plan. Any future growth is dictated by requests for
annexation submitted to Butte LAFCo.
Most of the 506 acres within the District consist of urban uses on smaller parcels, most of
which are located within the community of Durham. Land uses within the District include
single-family residential uses, commercial uses, industrial uses, and public uses.
There is very little potential for new development within the boundaries of the District. A
large portion of the community of Durham is zoned for medium and medium-high density
residential uses. However, the lack of a public sanitary sewer system in the Durham area
precludes the creation of small parcels or the construction of additional dwellings on
existing developed parcels. The area of the District outside of the Durham community
and urban reserve area is mostly zoned for agricultural uses on parcels with a minimum
parcel size of 20 to 40 acres. One potential development within the District is located on
a 40-acre parcel located on the east side of Durham, which is proposed to be developed
with 40 1-acre single-family residential parcels.
34
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Butte County General Plan Land Use Designations and Zoning Classifications within existing SOI
General Plan Designation Zoning Classification Parcels Acreage
Very Low Density Residential VLDR Very Low Density Residential VLDR 178 256.60
Very Low Density Residential VLDR Planned Development PD 14 11.80
Medium Density Residential MDR Medium Density Residential MDR 200 48.07
Medium High Density MHDR Medium High Density MHDR 69 22.33
Residential Residential
Medium High Density MHDR Planned Development PD 21 2.45
Residential
Retail RTL General Commercial GC 34 9.33
Industrial I General Industrial GI 16 21.85
General Industrial GI General Industrial GI 1 11.03
Public P Public P 11 72.88
TOTAL 544 456.34
Table 7 - General Plan Land Use Designations and Zoning Classifications within existing SOI
General Plan Land Use Designations and Zoning Classifications within Proposed Additions to the SOI
General Plan Designation Zoning Classification Parcels Acreage
Very Low Density VLDR Very Low Density Residential VLDR 59 271.63
Residential
TOTAL 59 271.63
Table 8 - General Plan Land Use Designations and Zoning Classifications within Proposed Additions to the SOI
Figure 15, below, shows the distribution of zoning within the current and proposed DID
Sphere of Influence.
35
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Figure 15 - DID SOI with Land Use
SOI DETERMINATION 1-1: PRESENT AND PLANNED LAND USES
Land uses within the boundaries of the Durham Irrigation District include
residential, commercial, industrial, public, and agricultural uses. Future growth
within the boundaries of the District is expected to occur primarily within the
Durham urban reserve area.
36
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
SOI FACTOR NO. 2: THE PRESENT AND PROBABLE NEED FOR PUBLIC FACILITIES AND SERVICES IN THE AREA.
Over the last ten years there have been several proposed subdivisions within the Durham
area but outside of the Durham Irrigation District boundary and existing SOI. These
proposed developments have mostly considered the use of other private wells on a
community water system rather than connecting to the DID system. However, the Butte
County General Plan 2030 Policy D2N-P6.8 “Require subdivisions adjacent to existing
water systems to connect to them” (Area and Neighborhood Plans Element). In these
cases, DID has reviewed service options with the applicants, although the proposed
subdivision projects have not moved forward. In the future DID would like to be able to
provide service to them for the orderly development of the community of Durham.
TPM 16-0011
4 Lots
Figure 16 - SOI Vacancy Map
37
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Figure 16 shows the locations of vacant parcels in the DID current and proposed Sphere
of Influence. Currently there are 24 vacant parcels in the District and the proposed SOI
will add an additional 16 parcels. The vacancy count does not take into account the
parcels that do not meet the maximum density per the Butte County Land Use code.
As presented in MSR Factor No. 3 (Present and planned capacity of public facilities,
adequacy of public services, and infrastructure needs or deficiencies), the District has
adequate water supplies and conveyance infrastructure to provide service to existing
customers. However, by expanding the SOI, especially in the eastern part of the District,
it is likely that an additional well would need to be installed to meet the Title 22
requirements to provide adequate capacity for both pressure and use demands and
ensure the required redundancy to serve additional parcels to be added to the District’s
SOI. Additional water line infrastructure would also be necessary to serve future
development.
SOI DETERMINATION 2-1: THE PRESENT AND PROBABLE NEED FOR PUBLIC FACILITIES AND SERVICES IN THE
AREA
The District has adequate water supplies and conveyance infrastructure to
provide service to existing customers. However, by expanding the SOI it is likely
that an additional well would need to be installed to provide adequate water
and required redundancy to serve additional parcels proposed to be added to
the District’s SOI. Additional water line infrastructure would also be necessary to
serve future development.
SOI DETERMINATION 2-2: THE PRESENT AND PROBABLE NEED FOR PUBLIC FACILITIES AND SERVICES IN THE
AREA
With demonstrated capabilities and adequate water supplies, the District is the
logical choice to provide domestic water services to new development within the
Durham community and the Commission encourages such consideration by
affected local agencies with land use approval.
SOI FACTOR NO. 3: THE PRESENT CAPACITY OF PUBLIC FACILITIES AND ADEQUACY OF PUBLIC SERVICES
THAT THE AGENCY PROVIDES OR IS AUTHORIZED TO PROVIDE.
As presented in MSR Factor No. 3 (Present and planned capacity of public facilities,
adequacy of public services, and infrastructure needs or deficiencies), the District has
been providing adequate supplies of water to its service area for day to day needs
during years of normal precipitation. The District’s water supply is sufficient to
accommodate the projected growth within the current district limits. Expansion of the
District limits may require the drilling of an additional well to be able to provide adequate
water supply to the expanded area.
38
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
SOI DETERMINATION 3-1: PRESENT CAPACITY OF PUBLIC FACILITIES AND ADEQUACY OF PUBLIC SERVICES
The District has been providing adequate supplies of water to its service area for
day to day needs during years of normal precipitation. The District’s water supply
is sufficient to accommodate the projected growth within the current district limits.
Expansion of the District limits may require the drilling of an additional well to be
able to provide adequate water supply to the expanded area.
SOI FACTOR NO. 4: THE EXISTENCE OF ANY SOCIAL OR ECONOMIC COMMUNITIES OF INTEREST IN THE AREA
IF THE COMMISSION DETERMINES THAT THEY ARE RELEVANT TO THE AGENCY.
DID’s jurisdictional boundaries consist of the greater Durham area, which includes the
unincorporated urban community of Durham.
SOI DETERMINATION 4-1: EXISTENCE OF ANY SOCIAL OR ECONOMIC COMMUNITIES OF INTEREST IN THE
AREA
The jurisdictional boundaries of the Durham Irrigation District include the
unincorporated community of Durham.
SOI FACTOR NO. 5: FOR AN UPDATE OF A SPHERE OF INFLUENCE OF A CITY OR SPECIAL DISTRICT THAT
PROVIDES PUBLIC FACILITIES OR SERVICES RELATED TO SEWERS, MUNICIPAL AND
INDUSTRIAL WATER, OR STRUCTURAL FIRE PROTECTION, THAT OCCURS PURSUANT TO
SUBDIVISION (G) ON OR AFTER JULY 1, 2012, THE PRESENT AND PROBABLE NEED FOR
THOSE PUBLIC FACILITIES AND SERVICES OF ANY DISADVANTAGED UNINCORPORATED
COMMUNITIES WITHIN THE EXISTING SPHERE OF INFLUENCE.
The Durham Irrigation District provides public facilities or services related to municipal
water. However, per the Census tract data, the Durham community would not be
considered a disadvantaged unincorporated community (DUC). However, there are
areas within the Durham Irrigation District service area, specifically islands of multifamily
housing and smaller single-family residences that, if analyzed separately from the tract
data, may potentially qualify as a DUC. The District provides water services to the parcels
within the District regardless of DUC status.
SOI DETERMINATION 5-1: DISADVANTAGED UNINCORPORATED COMMUNITIES
Per the Census tract data, as a whole, the Durham community would not be
considered a disadvantaged unincorporated community (DUC). The District
provides water services to the parcels within the District regardless of DUC status.
39
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Sphere of Influence Findings and Recommendations
Based on the MSR and SOI determinations contained in this document, the Commission:
1. Finds that the Durham Irrigation District effectively provides domestic water service
to the parcels within the District.
2. Finds that residential development in Durham Irrigation District’s SOI can be
efficiently served by connection to the District’s domestic water system.
3. Finds that the District has demonstrated capabilities and adequate water supplies,
the District is the logical choice to provide domestic water services to new
development within the Durham community and the Commission encourages
such consideration by affected local agencies with land use approval.
4. Adds 63 parcels, totaling approximately 280.1 acres, to the DID’s Sphere of
Influence, as shown on Figure 13 of the MSR/SOI Plan.
40
This page intentionally left blank
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Adopted LAFCo Resolution
41
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
42
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
43
This page intentionally left blank
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
Public Comments Received
No written comments were received regarding the Public Review Draft MSR/SOI
Plan for the Durham Irrigation District
44
This page intentionally left blank
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
GLOSSARY
ADOPTED BUDGET The spending plan approved by resolution of the Board of
Supervisors after the required public hearing and
deliberations on the Recommended Budget. The Adopted
Budget must be balanced with Total Financing Sources
equal to Total Financing Uses.
ANNEXATION The inclusion, attachment, or addition of a territory to a city
of district.
BOARD OF SUPERVISORS The elected board of supervisors of a county.
BUDGET The planning and controlling document for financial
operation with appropriations and revenues for a given
period of time, usually one year.
CALIFORNIA ENVIRONMENTAL The California Environmental Quality Act (CEQA) is
QUALITY ACT (CEQA) intended to inform governmental decision-makers and the
public about potential environmental effects of a project,
identify ways to reduce adverse impacts, offer alternatives
to the project, and disclose to the public why a project was
approved. CEQA applied to projects undertaken, funded,
or requiring issuance of a permit by a public agency.
CONTINGENCY An amount appropriated for unforeseen expenditure
requirements. Transfers from this budget unit to any other
budget unit for specific use require a four-fifths vote of the
Board of Supervisors.
DISTRICT OR SPECIAL DISTRICT An agency of the state, formed pursuant to general
law or special act, for the local performance of
government or proprietary functions within limited
boundaries. “District” or “special district” includes a
county service area.
EXPENDITURES Expenditures occur when the County buys goods and
services and pays its employees. Expenditures can be
categorized into three types: operating expenditures,
capital expenditures, and debt service expenditures.
Operating expenditures are the day-to-day spending on
salaries, supplies, utilities, services, and contracts. Capital
expenditures are generally for acquisition of major assets
such as land and buildings or for the construction of
buildings or other improvements. Debt expenditures repay
45
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
borrowed money and interest on that borrowed money.
FISCAL YEAR Twelve-month period for which a budget is prepared.
Butte County’s fiscal year is July 1 through June 30 of each
year.
FUND BALANCE The difference between assets and liabilities reported in a
governmental fund.
GENERAL PLAN A document containing a statement of development
policies, including a diagram and text setting forth the
objectives of the plan. The general plan must include
certain state mandated elements related to land use,
circulation, housing, conservation, open-space, noise, and
safety.
INTERFUND TRANSFER A transfer made between budget units in different funds
for services rendered and received. The service rendering
budget unit shows these transfers as revenue, as opposed
to expenditure reduction.
LAFCO A state mandated local agency that oversees boundary
changes to cities and special districts, the formation of
new agencies including incorporation of new cities, and
the consolidation of existing agencies. The broad goals of
the agency are to ensure the orderly formation of local
government agencies, to preserve agricultural and open
space lands, and to discourage urban sprawl.
LOCAL ACCOUNTABILITY The term “local accountability and governance,” refers to
AND GOVERNANCE public agency decision making, operational and
management styles that include an accessible staff,
elected or appointed decision-making body and decision
making process, advertisement of, and public
participation in, elections, publicly disclosed budgets,
programs, and plans, solicited public participation in the
consideration of work and infrastructure plans, programs or
operations and disclosure of results to the public.
MANAGEMENT EFFICIENCY The term “management efficiency,” refers to the
organized provision of the highest quality public services
with the lowest necessary expenditure of public funds. An
efficiently managed entity (1) promotes and demonstrates
implementation of continuous improvement plans and
strategies for budgeting, managing costs, training and
utilizing personnel, and customer service and involvement,
46
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
(2) has the ability to provide service over the short and long
term, (3) has the resources (fiscal, manpower, equipment,
adopted service or work plans) to provide adequate
service, (4) meets or exceeds environmental and industry
service standards, as feasible considering local conditions
or circumstances, (5) and maintains adequate
contingency reserves.
MUNICIPAL SERVICE REVIEW A study designed to determine the adequacy of
(MSR) governmental services being provided in the region or sub-
region. Performing service reviews for each city and
special district within the county may be used by LAFCO,
other governmental agencies, and the public to better
understand and improve service conditions.
PUBLIC AGENCY The state or any state agency, board, or commission, any
city, county, city and county, special district, or other
political subdivision.
RESERVE (1) For governmental type funds, an account used to
earmark a portion of the fund balance, which is legally or
contractually restricted for a specific use or not
appropriate for expenditure. (2) For proprietary
type/enterprise funds, the portion of retained earnings set
aside for specific purposes. Unnecessary reserves are
those set aside for purposes that are not well defined or
adopted or retained earnings that are not reasonably
proportional to annual gross revenues.
REVENUE Funds received to finance governmental services from
various sources and treated as income to the County.
Examples: property taxes, sales taxes, and per parcel
service charges.
SPHERE OF INFLUENCE A plan for the probable physical boundaries and service
(SOI) area of a local agency, as determined by the LAFCO
SPHERE OF INFLUENCE In establishing a sphere of influence the Commission must
DETERMINATIONS consider and prepare written determinations related to
present and planned land uses, need and capacity of
public facilities, and existence of social and economic
communities of interest.
ZONE OF BENEFIT A geographic area within a county service area that
provides a particular service or services to the parcels
within that area.
47
Durham Irrigation District Municipal Service Review/Sphere of Influence Plan
ZONING The primary instrument for implementing the general plan.
Zoning divides a community into districts or “zones” that
specify the permitted/prohibited land uses.
48