LAFCO
Contra Costa Countywide Reclamation Services MSR-Public Review Draft
Read the report at Local Agency Formation Commissions ↗
Contra Costa Countywide Reclamation Services MSR
Administrative Draft
Contra Costa Countywide Reclamation
Services
Municipal Service Review
Public Review Draft
July 9, 2025
Prepared by: Policy Consulting Associates, LLC
Contra Costa Countywide Reclamation Services MSR
TABLE OF CONTENTS ........................................................................................................................................ 1
LIST OF FIGURES ............................................................................................................................................... 5
ACRONYMS AND DEFINITIONS .......................................................................................................................... 7
PREFACE 9
CONTEXT 9
CREDITS 9
1. EXECUTIVE SUMMARY ................................................................................................................... 10
OVERVIEW .................................................................................................................................................................. 10
RECLAMATION DISTRICTS ............................................................................................................................................... 18
DISADVANTAGED UNINCORPORATED COMMUNITIES ........................................................................................................... 25
SERVICE CAPACITY ........................................................................................................................................................ 26
INFRASTRUCTURE NEEDS ................................................................................................................................................ 34
FINANCIAL ABILITY TO PROVIDE SERVICES ......................................................................................................................... 38
GOVERNANCE STRUCTURE OPTIONS ................................................................................................................................ 47
CONCLUSION AND RECOMMENDATIONS ........................................................................................................................... 54
2. BACKGROUND ............................................................................................................................... 57
LAFCO OVERVIEW ....................................................................................................................................................... 57
MUNICIPAL SERVICES REVIEW LEGISLATION....................................................................................................................... 57
MUNICIPAL SERVICES REVIEW PROCESS ............................................................................................................................ 58
SPHERE OF INFLUENCE UPDATES ..................................................................................................................................... 58
DISADVANTAGED UNINCORPORATED COMMUNITIES ........................................................................................................... 60
3. OVERVIEW .................................................................................................................................... 62
THE SACRAMENTO/ SAN JOAQUIN DELTA ......................................................................................................................... 62
REGULATORY SETTING ................................................................................................................................................... 81
RECLAMATION DISTRICTS ............................................................................................................................................. 103
4. RECLAMATION DISTRICTS—FUNDING OPPORTUNITIES ................................................................. 105
PROPERTY TAXES ........................................................................................................................................................ 105
GRANT FUNDING SOURCES .......................................................................................................................................... 106
GRANT FUNDING PROGRAMS AND PROJECTS ................................................................................................................... 108
5. RECLAMATION DISTRICT 799 (HOTCHKISS TRACT) ......................................................................... 118
AGENCY OVERVIEW .................................................................................................................................................... 118
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 123
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 125
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 126
FACILITY 129
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 133
RD 799 MSR DETERMINATIONS .................................................................................................................................. 135
RD 799- PROPOSED SOI DETERMINATIONS.................................................................................................................... 138
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 139
6. RECLAMATION DISTRICT 800 (BYRON TRACT) ............................................................................... 140
AGENCY OVERVIEW .................................................................................................................................................... 140
Table of Contents Policy Consulting Associates, LLC 1
Contra Costa Countywide Reclamation Services MSR
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 144
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 145
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 146
FACILITY 150
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 153
RD 800 MSR DETERMINATIONS .................................................................................................................................. 155
RD 800- PROPOSED SOI DETERMINATIONS.................................................................................................................... 158
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY ......................................................................................................... 159
7. RECLAMATION DISTRICT 830 (JERSEY ISLAND) .............................................................................. 160
AGENCY OVERVIEW .................................................................................................................................................... 160
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 163
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 164
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 165
FACILITY 168
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 173
RD 830 MSR DETERMINATIONS .................................................................................................................................. 174
RD 830- PROPOSED SOI DETERMINATIONS.................................................................................................................... 177
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 178
8. RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS) ...................................................... 179
AGENCY OVERVIEW .................................................................................................................................................... 179
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 183
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 184
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 185
FACILITY 188
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 193
RD 2024 MSR DETERMINATIONS ................................................................................................................................ 194
RD 2024- PROPOSED SOI DETERMINATIONS.................................................................................................................. 197
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 198
9. RECLAMATION DISTRICT 2025 (HOLLAND TRACT).......................................................................... 199
AGENCY OVERVIEW .................................................................................................................................................... 199
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 203
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 204
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 205
FACILITY 208
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 212
RD 2025 MSR DETERMINATIONS ................................................................................................................................ 213
RD 2025- PROPOSED SOI DETERMINATIONS.................................................................................................................. 216
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 217
10. RECLAMATION DISTRICT 2026 (WEBB TRACT) ............................................................................... 218
AGENCY OVERVIEW .................................................................................................................................................... 218
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 223
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 224
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 225
FACILITY 231
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 236
RD 2026 MSR DETERMINATIONS ................................................................................................................................ 237
RD 2026- PROPOSED SOI DETERMINATIONS.................................................................................................................. 241
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 242
Table of Contents Policy Consulting Associates, LLC 2
Contra Costa Countywide Reclamation Services MSR
11. RECLAMATION DISTRICT 2059 (BRADFORD ISLAND) ...................................................................... 243
AGENCY OVERVIEW .................................................................................................................................................... 243
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 247
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 249
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 250
FACILITY 258
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 262
RD 2059 MSR DETERMINATIONS ................................................................................................................................ 264
RD 2059- PROPOSED SOI DETERMINATIONS.................................................................................................................. 267
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 268
12. RECLAMATION DISTRICT 2065 (VEALE TRACT) ............................................................................... 269
AGENCY OVERVIEW .................................................................................................................................................... 269
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 273
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 274
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 275
FACILITY 278
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 283
RD 2065 MSR DETERMINATIONS ................................................................................................................................ 284
RD 2065- PROPOSED SOI DETERMINATIONS.................................................................................................................. 287
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 288
13. RECLAMATION DISTRICT 2090 (QUIMBY ISLAND) .......................................................................... 289
AGENCY OVERVIEW .................................................................................................................................................... 289
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 294
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 295
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 296
FACILITY 299
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 303
RD 2090 MSR DETERMINATIONS ................................................................................................................................ 304
RD 2090- PROPOSED SOI DETERMINATIONS.................................................................................................................. 307
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 308
14. RECLAMATION DISTRICT 2117 (CONEY ISLAND) ............................................................................ 309
AGENCY OVERVIEW .................................................................................................................................................... 309
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 313
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 314
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 315
FACILITY 318
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 322
RD 2117 MSR DETERMINATIONS ................................................................................................................................ 324
RD 2117- PROPOSED SOI DETERMINATIONS.................................................................................................................. 327
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 328
15. RECLAMATION DISTRICT 2122 (WINTER ISLAND) ........................................................................... 329
AGENCY OVERVIEW .................................................................................................................................................... 329
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 333
GROWTH AND POPULATION PROJECTIONS ...................................................................................................................... 333
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 333
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 334
FACILITY 336
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 336
Table of Contents Policy Consulting Associates, LLC 3
Contra Costa Countywide Reclamation Services MSR
RD 2122 MSR DETERMINATIONS ................................................................................................................................ 338
RD 2122- PROPOSED SOI DETERMINATIONS.................................................................................................................. 340
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 341
16. RECLAMATION DISTRICT 2137 (DUTCH SLOUGH) ........................................................................... 342
AGENCY OVERVIEW .................................................................................................................................................... 342
ACCOUNTABILITY AND GOVERNANCE ............................................................................................................................. 348
DISADVANTAGED UNINCORPORATED COMMUNITIES ......................................................................................................... 349
FINANCIAL ABILITY TO PROVIDE SERVICES ....................................................................................................................... 350
FACILITY 353
GOVERNANCE STRUCTURE OPTIONS .............................................................................................................................. 357
RD 2137 MSR DETERMINATIONS ................................................................................................................................ 361
RD 2137- PROPOSED SOI DETERMINATIONS.................................................................................................................. 365
RECOMMENDED SPHERE OF INFLUENCE BOUNDARY.......................................................................................................... 366
Table of Contents Policy Consulting Associates, LLC 4
Contra Costa Countywide Reclamation Services MSR
FIGURE 1-1: SUMMARY OF LEVEE STANDARDS AND GUIDANCE ........................................................................ 17
FIGURE 1-2: RECLAMATION DISTRICTS REVIEWED ............................................................................................. 18
FIGURE 1-3: CONTRA COSTA COUNTY RECLAMATION DISTRICTS, LAND USE AND POPULATION ..................... 23
FIGURE 1-4: RECLAMATION DISTRICT SERVICE CONFIGURATION ...................................................................... 29
FIGURE 1-5: COMPLIANCE STATUS OF RECLAMATION DISTRICT LEVEE SYSTEMS (BY PERCENTAGE) ............... 33
FIGURE 1-6: INFRASTRUCTURE NEEDS BY DISTRICTS .......................................................................................... 35
FIGURE 1-7: REVENUE SOURCES BY DISTRICT BY PERCENTAGE, FY 22-23.......................................................... 39
FIGURE 1-8: CONTRA COSTA RDS REVENUES PER LEVEE MILE, FY 22-23 ........................................................... 41
FIGURE 1-9: CONTRA COSTA RDS EXPENDITURE PER LEVEE MILE, FY 22-23 ...................................................... 43
FIGURE 1-10: CONTRA COSTA COUNTY RDS FUND BALANCE AT THE END OF FY 22-23 ...................................... 46
FIGURE 1-11: RECOMMENDED GOVERNANCE STRUCTURE OPTIONS AND SOI UPDATE, SUMMARY ................. 51
FIGURE 3-1: PRIMARY AND SECONDARY ZONES OF THE SACRAMENTO-SAN JOAQUIN DELTA .......................... 70
FIGURE 3-2: SACRAMENTO-SAN JOAQUIN DELTA, LAND USES ........................................................................... 73
FIGURE 3-3: CONTRA COSTA COMMUNITIES LOCATED PARTIALLY OR COMPLETELY WITHIN THE DELTA ........ 79
FIGURE 3-4: FEMA FLOOD ZONE DESIGNATION.................................................................................................. 91
FIGURE 3-5: PROJECT LEVEES AND NON-PROJECT LEVEES IN THE DELTA .......................................................... 95
FIGURE 3-6: CONTRA COSTA COUNTY RECLAMATION DISTRICTS BY DELTA ZONE .......................................... 104
FIGURE 4-1: FY 23-24 CONTRA COSTA COUNTY RDS SUBVENTIONS PROGRAM APPLICATION AMOUNTS BY
PRIORITY ........................................................................................................................................ 112
FIGURE 5-1: RD 799 GENERAL INFORMATION .................................................................................................. 120
FIGURE 5-2: RD 799 BOUNDARIES AND SOI ...................................................................................................... 122
FIGURE 5-3: RD 799 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................... 127
FIGURE 5-4: RD 799 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ........................... 131
FIGURE 6-1: RD 800 GENERAL INFORMATION .................................................................................................. 141
FIGURE 6-2: RD 800 BOUNDARIES AND SOI ...................................................................................................... 143
FIGURE 6-3: RD 800 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................... 147
FIGURE 6-4: RD 800 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ........................... 152
FIGURE 7-1: RD 830 GENERAL INFORMATION .................................................................................................. 161
FIGURE 7-2: RD 830 BOUNDARIES AND SOI ...................................................................................................... 162
FIGURE 7-3: RD 830 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................... 166
FIGURE 7-4: RD 830 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ........................... 171
FIGURE 8-1: RD 2024 GENERAL INFORMATION ................................................................................................ 180
FIGURE 8-2: RD 2024 BOUNDARIES AND SOI .................................................................................................... 182
List of Figures Policy Consulting Associates, LLC 5
Contra Costa Countywide Reclamation Services MSR
FIGURE 8-3: RD 2024 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................. 186
FIGURE 8-4: RD 2024 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ......................... 191
FIGURE 9-1: RD 2025 GENERAL INFORMATION ................................................................................................ 201
FIGURE 9-2: RD 2025 BOUNDARIES AND SOI .................................................................................................... 202
FIGURE 9-3: RD 2025 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................. 206
FIGURE 9-4: RD 2025 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ......................... 210
FIGURE 10-1: RD 2026 GENERAL INFORMATION ................................................................................................ 220
FIGURE 10-2: RD 2026 BOUNDARIES AND SOI .................................................................................................... 222
FIGURE 10-3: RD 2026 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................. 226
FIGURE 10-4: RD 2026 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ......................... 234
FIGURE 11-1: RD 2059 GENERAL INFORMATION ................................................................................................ 244
FIGURE 11-2: RD 2059 BOUNDARIES AND SOI .................................................................................................... 246
FIGURE 11-3: RD 2059 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................. 252
FIGURE 11-4: RD 2059 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ......................... 260
FIGURE 12-1: RD 2065 GENERAL INFORMATION ................................................................................................ 270
FIGURE 12-2: RD 2065 BOUNDARIES AND SOI .................................................................................................... 272
FIGURE 12-3: RD 2065 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................. 276
FIGURE 12-4: RD 2065 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ......................... 281
FIGURE 13-1: RD 2090 GENERAL INFORMATION ................................................................................................ 291
FIGURE 13-2: RD 2090 BOUNDARIES AND SOI .................................................................................................... 292
FIGURE 13-3: RD 2090 FY 24-25 BUDGET ............................................................................................................ 298
FIGURE 13-4: RD 2090 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ......................... 301
FIGURE 14-1: RD 2117 GENERAL INFORMATION ................................................................................................ 310
FIGURE 14-2: RD 2117 BOUNDARIES AND SOI .................................................................................................... 312
FIGURE 14-3: RD 2117 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................. 316
FIGURE 14-4: RD 2117 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ......................... 321
FIGURE 15-1: RD 2122 GENERAL INFORMATION ................................................................................................ 330
FIGURE 15-2: RD 2122 BOUNDARIES AND SOI .................................................................................................... 331
FIGURE 15-3: RD 2122 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................. 335
FIGURE 16-1: RD 2137 GENERAL INFORMATION ................................................................................................ 344
FIGURE 16-2: RD 2137 BOUNDARIES AND SOI .................................................................................................... 346
FIGURE 16-3: RD 2137 FINANCIAL SUMMARY, FY 21-22 AND FY 22-23 ............................................................ 351
FIGURE 16-4: RD 2137 SERVICE CONFIGURATION, FACILITIES, AND INSPECTIONS OVERVIEW ......................... 356
List of Figures Policy Consulting Associates, LLC 6
Contra Costa Countywide Reclamation Services MSR
AB: Assembly Bill
BFE Base Flood Elevation
BNSF: Burlington Northern Santa Fe Railroad
CALFED: California-Federal Bay-Delta Program
CCCFWD: Contra Costa County Flood Control and Water Conservation District
CDP: Census Designated Place
CDFW: California Department of Fish and Wildlife
CESCF: Cooperative Endangered Species Conservation Fund
CEQA: California Environmental Quality Act
CKH: Cortese-Knox-Hertzberg
CSDS: California State Duck Stamp
CVFPB: Central Valley Flood Protection Board
CVP: Central Valley Project
CWA: California Waterfowl Association
CWC: California Water Code
DPC: Delta Protection Commission
DPIIC: Delta Plan Interagency Implementation Committee
DUC: Disadvantaged Unincorporated Community
DWR: Department of Water Resources
EBMUD: East Bay Municipal Utility District
ERP: Ecosystem Restoration Program
FEMA: Federal Emergency Management Agency
FCCE: Flood Control and Coastal Emergencies
FCP: Flood Corridor Program
FGC: Fish and Game Commission
FIRM: Flood Insurance Rate Map
GHG: Greenhouse gas
GPM: gallons per minute
HMP: Hazard Mitigation Plan
JPA: Joint Powers Authority
LAFCO: Local Agency Formation Commission
LMA: Levee Maintenance Agency
MHI: Median Household Income
NHA: National Heritage Area
NFIP: FEMA’s National Flood Insurance Program
NMFS: National Marine Fisheries Service
PG&E: Pacific Gas and Electric
Acronyms and Definitions Policy Consulting Associates, LLC 7
Contra Costa Countywide Reclamation Services MSR
PL 84-99: Public Law 84-99
RD: Reclamation District
RLA: Recovery Land Acquisition
SB: Senate Bill
SFHAs: Special Flood Hazard Areas
SOI: Sphere of Influence
SWP: State Water Project
ULDC: Urban Levee Design Criteria
ULL: Urban Limit Line
USFWS: U.S. Fish and Wildlife Service
USACE: U.S. Army Corps of Engineers
WAPA: Western Area Power Administration
Acronyms and Definitions Policy Consulting Associates, LLC 8
Contra Costa Countywide Reclamation Services MSR
Prepared for the Local Agency Formation Commission of Contra Costa (LAFCO), this report is a
Municipal Services Review (MSR) / Sphere of Influence Update (3rd Round) covering 12
reclamation districts located in Contra Costa County. An MSR is a state-required comprehensive
study of services within a designated geographic area.
Contra Costa LAFCO is required to prepare this MSR by the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000 (Government Code §56000, et seq.), which took effect
on January 1, 2001. This Countywide Reclamation District review examines reclamation and
levee services provided by 12 special districts in Contra Costa County, whose boundaries and
governance are subject to LAFCO.
The authors extend their appreciation to those individuals at the many agencies that provided
responses to questionnaires, as well as planning and financial information and documents used
in this report.
Policy Consulting Associates conducted this MSR with direction from Contra Costa LAFCO
Executive Officer, Lou Ann Texeira. Jennifer Stephenson acted as Project Manager. Melat
Assefa was the primary author and analyst.
Preface Policy Consulting Associates, LLC 9
1 .
This report is a municipal service review (MSR) covering 12 reclamation districts in Contra Costa
County, prepared for the Contra Costa Local Agency Formation Commission (LAFCO). An MSR is
a State-required comprehensive study of services that special districts or cities provide. The
MSR requirement is codified in the Cortese-Knox-Hertzberg Local Government Reorganization
Act of 2000 (Government Code §56000 et seq.). The most recent MSR for the reclamation
districts was adopted in 2015.
The Sacramento-San Joaquin Delta encompasses parts of San Joaquin, Sacramento, Yolo,
Solano, Alameda, and Contra Costa counties. The Delta plays a significant role in the economy,
natural environment, and communities of Contra Costa County and the entire state of
California. In addition to being a vital part of a unique estuary ecosystem, the Delta provides a
diverse range of goods and services derived from its land, water, and the local population.
The Delta is a vital link in California’s water delivery system. Approximately one-quarter of the
state's drinking water originates from the Delta, and two-thirds of Californians rely on it for
some or all of their drinking water. The Central Valley Project (CVP) and the State Water Project
(SWP) supply this water to numerous cities and communities, including some of California's
largest urban areas. Additionally, around three million acres of agricultural land, both within
and outside the Delta, are irrigated using its water.
In addition to agriculture and water supply, the Delta provides habitat and riparian areas for
wildlife. Riparian habitats support a diverse range of wildlife, including sensitive invertebrates,
amphibians, reptiles, birds, and mammals. An estimated 25 percent of all warm water and
anadromous sport fishing species and 80 percent of the state’s commercial fishery species
Ch. 1 Executive Summary Policy Consulting Associates, LLC 10
inhabit or migrate through the Delta, and at least half of the Pacific Flyway’s migratory water
birds rely on the region’s wetlands.
Finally, the Delta, including parts of Contra Costa County, has “designated critical habitat”
areas. These areas ensure that actions authorized by federal agencies will not destroy or
adversely modify critical habitat, thereby protecting areas necessary for the conservation of the
species. However, not all federally listed species have designated critical habitats.
Recreation is an integral part of the Delta, with an estimated 12 million visitor days of use
annually, approximately two-thirds of which are boating and fishing-related. The Delta features
290 shoreline recreational areas, 300 marinas, 57,000 navigable waterways, and more than 20
species of sport fish. It is also home to over 750 species of plants and wildlife, including 55
species of fish. According to the updated Economic Sustainability Plan for the Delta, recreation
generates more than $200 million in direct annual spending.
Three state agencies are responsible for regulating, conserving, and protecting the Sacramento-
San Joaquin Delta: the Delta Stewardship Council, the Sacramento-San Joaquin Delta
Conservancy, and the Delta Protection Commission.
The Delta Reform Act of 2009 established two primary goals: ensuring water supply reliability
and enhancing ecosystem resilience. This framework is designed to protect and improve the
Delta as a dynamic region. The Act also created the Delta Stewardship Council and the Delta
Conservancy, while instituting a state policy aimed at reducing California's dependence on the
Delta for future water supply needs.
These agencies collaborate closely with state, federal, and local partners to achieve these goals.
Safeguarding water quality within the Delta and maintaining the existing network of levees and
channels are crucial for upholding Delta salinity standards and preventing saltwater intrusion
from the San Francisco Bay.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 11
The greatest stresses to the levees in the Delta occur when a large storm coincides with high
tides. Water levels in Delta channels rise due to high stormwater flows, high tides, and even low
air pressures associated with storms. In addition, the levees must withstand erosion from wind-
induced waves. Under these circumstances, levees can fail due to overtopping when water
levels rise above the levee tops and flow onto the islands. They can also collapse from increased
pressure caused by island subsidence, burrowing animals, long-term erosion from high flow
events, wind-induced waves, boat wakes, deferred maintenance, and water seepage through
sand layers beneath the levee, among other factors not yet well understood.
Several factors will strongly affect future conditions in the Delta, including climate change,
changes in land use patterns, shifts in water demand, the continuing subsidence of some
islands, seismic activity, and the introduction of new species. These factors will increase the
vulnerability of the Delta’s levee system, ecosystems, and water supply infrastructure, making
long-term planning and adaptation efforts essential.
The 1959 Delta Protection Act15 established the legal boundary of the Delta, which spans about
738,000 acres in Northern California at the western edge of the Central Valley. The 1992
Johnston-Baker-Andal-Boatwright Delta Protection Act refined the legal boundary of the Delta
by designating Primary and Secondary Zones.
The Primary Zone, statutorily defined as comprising “Delta land and water area of primary state
concern and statewide significance,” comprises approximately 500,000 acres of waterways,
levees, and farmed lands in all the Delta counties. The Secondary Zone, which includes the cities
of Stockton, Lathrop, Tracy, Oakley, and West Sacramento, is part of the Delta where
development can occur. Development projects in the Secondary Zone are primarily subject to
local land use decisions.
East Contra Costa County covers a large area within the southwestern Delta. The entire
northern border of the County is bound by a waterfront that flows from the Delta to the San
Francisco Bay. Contra Costa communities of Bay Point, Bethel Island, Discovery Bay, and
Ch. 1 Executive Summary Policy Consulting Associates, LLC 12
Knightsen are entirely within the Delta. While the cities of Antioch, Brentwood, Oakley, and
Pittsburg, as well as the town of Byron, are partially within the Delta.
The majority of the Delta is rural, comprised of farms and small towns, while the edges are
more urban, with higher-density developments and residents who commute for employment.
The primary zone encompasses much of the agriculturally focused land, while the secondary
zone is more urban-influenced and includes the Delta's cities and most of the Delta’s
population.
The majority of Delta residents live in or near the peripheral urban areas, while the population
density in the inner Delta is generally very low. As of 2015, the Delta is home to 582,884
people. Of this population, 573,483 resided in the Secondary Zone, while 9,401 lived in the
Primary Zone.
Future development and growth in the Delta are significantly affected by Senate Bill (SB) 5,
which requires cities and counties with urban and urbanizing areas in the Sacramento-San
Joaquin Valley to establish substantial evidence that certain developments and projects are
protected from a 200-year flood event, which represents a flood event that has a 0.5-percent
probability of occurring in any year, before approval is granted. SB 5 affects only areas of
anticipated new development or development in progress in urban and urbanizing areas within
the Sacramento-San Joaquin Valley.
Development in the Delta is also constrained by the California Land Conservation Act
(commonly known as the Williamson Act) program, in which Contra Costa County is a
participant. The Williamson Act aims to preserve agricultural land and open space by
discouraging premature and unnecessary conversion to urban uses. Williamson Act contracts
are voluntarily established 10-year agreements between a landowner and the County, and the
term of the contract is automatically renewed each year unless a notice of non-renewal is filed
by the landowner.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 13
Similar to the Williamson Act lands, conservation easements, which are legal agreements
between a landowner and a government or nonprofit entity, aim to set aside lands for non-
urban uses. Conservation easements typically restrict development and subdivision to the
degree necessary to protect a property's significant habitat, open space, or other conservation
values. Some conservation easements may allow limited development in areas known as “home
sites” or “exclusions,” where small-scale development is allowed, generally in areas of low
conservation value (one to two acres in size).
Land and water use in the Delta are managed by a complex network of federal and State laws
and regulations related to water rights, water quality, endangered species management, and
land development. The following federal, state, and local agencies currently play a significant
regulatory and levee management role in the Delta.
• Federal Emergency Management Agency (FEMA) — FEMA plays a multitude of flood
management roles, including managing the National Flood Insurance Program (NFIP),
which includes mapping and classifying flood hazards. FEMA also provides federal disaster
recovery assistance in the event of federal emergency or disaster declarations.
• U.S. Army Corps of Engineers (USACE) — At the federal level, the USACE is primarily
responsible for planning, designing, and constructing federally authorized flood
management facilities, including dams, levees, and other structures. It also develops the
operational rules for federally funded flood control reservoirs.
• California Department of Water Resources (DWR) — Primarily acting through the Division
of Flood Management, DWR is responsible for State-level flood management, including
cooperating with USACE in project planning, design, and funding, cooperating with the
National Ocean and Atmospheric Administration in flood and water supply forecasting,
operating the Flood Operations Center, providing flood fight assistance, and maintaining
portions of the flood management system.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 14
• Central Valley Flood Protection Board (CVFPB) — CVFPB establishes, maintains, and
enforces standards for the construction, maintenance, and operation of the flood control
system to protect life, property, and habitat in California’s Central Valley.
• Contra Costa County Flood Control and Water Conservation District (CCCFWD) —
Established in 1951, the District provides regional flood protection and offers technical
information and education to both cities and residents. CCCFWD’s operations are
primarily funded by property taxes and developer fees.
• Local levee districts and reclamation districts (RDs) — Known collectively as Levee
Maintaining Agencies (LMAs), regularly patrol, maintain, repair, and conduct flood fights
as needed on the levees within their jurisdictions.
• Contra Costa County Local Agency Formation Commission (LAFCO) — Oversees the
formation, changes of organization, and dissolution of special districts, including RD’s in
Contra Costa County.
The Contra Costa County Flood Control and Water Conservation District (CCCFWD) manages
regional flood control infrastructure, including 79 miles of channels, creeks, and drainage
systems, along with 30 detention basins and dams. The County employs structural flood
management strategies, such as reservoirs, levees, and drainage systems, as well as non-
structural measures, including restricting development in floodplains through conservation
easements and regulatory measures, elevating and waterproofing structures, and restoring
floodplains to reduce flood risk.
Key flood risk reduction programs in the region include:
• FEMA’s National Flood Insurance Program (NFIP) — Maps flood hazard areas and
provides federally backed flood insurance to participating communities.
• Contra Costa County Floodplain Management Program — Requires new or substantially
improved structures in Special Flood Hazard Areas (SFHAs) to be elevated above the 100-
year Base Flood Elevation (BFE) to reduce flood risk and insurance costs.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 15
• Flood Control Subventions Program — Provides state funding to reimburse local agencies
for flood control maintenance, rehabilitation, and disaster response.
• Public Law 84-99 (PL 84-99) — Authorizes the U.S. Army Corps of Engineers to provide
emergency response and technical assistance to state and local governments before,
during, and after flood events.
The present-day Delta is defined both geographically and hydraulically by levees. Some of these
levees are known as project levees, which were constructed by the federal government and
later handed over to the State for maintenance as part of the State’s flood control plan. Project
levees are part of the Federal Flood Control Project and are built to higher standards that meet
U.S. Army Corps of Engineers guidelines. However, most levees in the Delta are non-project
levees built privately and maintained by local reclamation districts. All of the Contra Costa
County reclamation districts reviewed in this MSR maintain non-project levees.
Figure 1-1 summarizes the levee standards and guidance applicable to the Delta, including:
• The level of flood protection provided by each standard,
• The types of levees each standard applies to,
• The corresponding freeboard for each standard. Freeboard is the additional amount of
height above the Base Flood Elevation used as a factor of safety in determining the level
at which a structure's lowest floor must be elevated or floodproofed to be in accordance
with state or community floodplain management regulations.1
1 FEMA, Glossary.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 16
Figure 1-1: Summary of Levee Standards and Guidance
Standard Type Feet Flood Protection
Minimum geometric
Hazard Mitigation Plan template for FEMA Short-term guideline
(HMP) assistance eligibility 1 for flood protection
Project and eligible non Varies based on levee
PL 84-99 project levees 1.5 location and purpose
DWR Bulletin 192-82
(Agricultural) Agricultural levees 1.5 300-year protection
DWR Bulletin 192-82
(Urban) Urban levees 3 300-year protection
FEMA 100-year Protection Urban levees 3 100-year protection
Urban (CA law for areas with
FEMA 200-year Protection >10,000 residents) 3 200-year protection
Flood control facilities are subjected to natural forces that can reduce their effectiveness over
time. Routine maintenance helps preserve the original design and reliability of flood control
systems and involves activities including routine inspections of flood control facilities, erosion
control, vegetation removal, debris and sediment removal, and control of burrowing animals.
Coupled with long-term flood risk reduction projects, routine maintenance strengthens the
structural integrity of the levee systems. Maintenance activities are typically performed by
Levee Maintaining Agencies (LMA), including reclamation districts, responsible for specified
segments of levee systems.
Project levees are subject to USACE certification and inspection. In addition, they are subject to
AB 156 inspection and reporting requirements. The project levees are inspected four times a
year, including inspections by USACE. Under AB 156, the district must report the condition of its
levees to the DWR, which compiles an annual report.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 17
As mentioned, none of the reclamation districts reviewed here maintain project levees and are,
therefore, not subject to these reporting requirements. Additionally, according to the Water
Code Division 6, section 12989, the DWR must "inspect non-project levees of local agencies for
the purpose of monitoring and ascertaining the degree of compliance with, or progress towards
meeting, standards such as those set forth in Section 12984." The frequency of such inspections
is not specified in the Code.
There are no recent inspection records by DWR for the reclamation districts reviewed. Most
districts do not follow a formal levee inspection procedure; instead, they rely on routine,
informal inspections conducted by district trustees, staff, or engineers. The inspection practices
include regular visual patrols, increased monitoring during severe weather events, and periodic
inspections by engineers when specific projects or funding applications are in progress.
Reclamation districts are special districts responsible for reclaiming and/or maintaining land
subject to frequent overflow or flooding via systems of levees, dikes, pumps, and ditches in
both urban and rural areas. Most reclamation districts were established when local landowners
first started agricultural production many decades ago. For the past 130 years, the local
reclamation districts have been responsible for maintaining and improving Delta levees.
This MSR will focus on the 12 RDs within Contra Costa County and their capacity to protect
approximately 34,802.24± acres from flood events through the maintenance of approximately
116 miles of levee.2
Figure 1-2: Reclamation Districts Reviewed
District Name ACREAGE Miles of levee
799 Hotchkiss Tract 3,100± 14.9±
800 Byron Tract 6,933± 18.9±
830 Jersey Island 3,561± 15.5±
2024 Orwood and Palm Tracts 6,574± 14.3±
2025 Holland Tract 4,090± 10.96±
2026 Webb Tract 5,500± 12.9±
2 Adapting to Rising Tides: East Contra Costa County Vulnerability Assessment & Adaptation Project. April 2020. p.103.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 18
2059 Bradford Island 2,200± 7.4±
2065 Veale Tract 1,365± 5.05±
2090 Quimby Island 789± 7.02±
2117 Coney Island 935± 5.48±
2122 Winter Island 441± 0*
2137 Dutch Slough 785± 3.1±
*RD 2122 no longer maintains any levees, as they were breached as part of DWR’s Tidal
Restoration Project on the island to restore tidal connectivity and enhance wetland habitats.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 19
As shown in Figure 1-3, three of the 12 reviewed reclamation districts (RD 2090, RD 2122, and
RD 2137) have no residents, as their land is primarily designated for ecosystem conservation,
including marshland, tidal marsh, and wildlife preservation. Six of the districts mainly serve
agricultural purposes, with additional uses such as limited residential (RD 2024, RD 2059, RD
2065, RD 2117), commercial activities (RD 2026, RD 2059), recreational spaces (RD 2025), and
habitat preservation (RD 830). Many of these districts have minimal populations, ranging from a
single resident in RD 2026 to around 12 residents in RD 2059 and RD 2065. While, RD 2024 and
RD 2025 have slightly larger populations, with 40 and 30 residents, respectively.
In contrast, RD 799 has an estimated population of 3,335, primarily consisting of residential
land uses, along with vacant, commercial, and agricultural uses. RD 800 has the largest
population among the RDs reviewed, with approximately 6,900 residents and a mix of
agricultural, urban, commercial, and industrial land uses.
While most districts do not anticipate significant development or population growth, RD 799,
which currently has three planned residential projects, is expected to add 3,800 homes and 271
units. Once completed, these developments will likely lead to significant population growth
within the District. RD 799 encompasses land within both the City of Oakley and unincorporated
Contra Costa County.
As the designated land use authorities, both the County and the City are responsible for
enforcing the requirements of SB 5, which mandates that substantial evidence be presented
demonstrating that new developments and projects are protected from a 200-year flood event.
According to the City of Oakley’s current General Plan3 adopted in 2022, no areas within the
City or Planning Area are within the 200-year floodplain based on DWR’s Best Available Maps
(BAM)4. Therefore, the City is not currently affected by the SB 5 requirements, including the
33 City of Oakley, General Plan. Community Health & Safety Element. Adopted January 11, 2022. p.8-4.
4 SB 5 authorized DWR to develop the Best Available Maps (BAM) displaying 100- and 200-year floodplains for areas located
within the Sacramento-San Joaquin (SAC-SJ) Valley. SB 5 requires that these maps contain the best available information on
flood hazards and be provided to cities and counties in the SAC-SJ Valley watershed. This effort was completed by DWR in 2008.
DWR has expanded the BAM to cover all counties in the State and to include 500-year floodplains.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 20
General Plan and zoning amendment requirements. Both RD 2137 and RD 799, which
encompass land within the City, are within the 100-year flood zone, representing a 1 percent
chance of flooding in any given year.
Similarly, Contra Costa County’s 2045 General Plan indicates that there are no mapped 200-
year flood zones in unincorporated Contra Costa County; however, the County highlights that
the areas within the 500-year flood zone, which represents areas with 0.2 percent chance of
flooding in any given year, can be used as a proxy in low-lying portions of East County (areas
mainly at risk of flooding from the Delta).5
Most of the reclamation districts lie entirely within 100-year flood zones. Additionally,
Discovery Bay, which is primarily within RD 800, is designated as an area with reduced flood risk
due to the existing levee system with planned upgrades to achieve 200-year flood protection.6
Furthermore, the County has incorporated policies in the Public Facilities and Services Element
as well as the Health and Safety Element of the General Plan outlining various actions to
achieve 200-year flood protection in appropriate areas:
• PFS-P5.1— Support public and private efforts to improve protection against flooding,
subsidence, and inundation, especially projects that achieve 200-year flood protection or
better, factoring in anticipated sea level rise in areas of the county covered by the Central
Valley Flood Protection Plan (CVFPP).
• PFS-A5.2 (c)— Coordinate with responsible parties, public and private, to develop a flood
risk management plan for the levee systems protecting the unincorporated county that
establishes a long-term plan to upgrade the system as necessary to provide at least a 100-
year level of flood protection and 200-year level of flood protection where required.
• HS-P5.1— Prohibit urban development in areas designated 100- or 200-year (or 500-year
when used as a proxy for the 200-year) floodplain or in areas subject to increased flood
hazards due to subsidence or other changes unless appropriate mitigations to reduce
5 Contra Costa County, 2045 General Plan – Health and Safety Element. Adopted November 5, 2024. p. 9-14.
6 Contra Costa County, 2045 General Plan – Public Facilities and Services Element. Adopted November 5, 2024. p. 8-13.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 21
flood risk to the standards of the Flood Disaster Protection Act of 1973 or above are
implemented.
• HS-P5.4— Evaluate development within the Sacramento-San Joaquin Valley for
consistency with DWR’s Urban Level of Flood Protection Criteria. Prohibit new single-
family residences, density increases, subdivision maps, or development agreements for
any property within a 200-year floodplain in an urban or urbanizing area unless an
adequate finding can be made pursuant to California Water Code Sections 9600 to 9603.
• HS-P13.1— Except for infill sites, require new development in 100-year or 200-year
floodplains to have access to at least two emergency evacuation routes, and encourage
the same for existing development.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 22
Figure 1-3: Contra Costa County Reclamation Districts, Land Use and Population
District Name land USE land USE Authority Current Population
Primarily residential with commercial, City of Oakley; Contra
RD 799 Hotchkiss Tract agricultural, and vacant Costa County 3,335
RD 800 Byron Tract Agricultural, urban, commercial, and industrial Contra Costa County 6,900
Agriculture, cattle grazing, and habitat
RD 830 Jersey Island preservation Contra Costa County 3
Orwood and Palm Primarily agriculture, with limited residential, as 40; including
RD 2024 Tracts well as wildlife habitat and waterfowl Contra Costa County seasonal residents
Primarily agricultural and recreational, including
RD 2025 Holland Tract cattle grazing operations and two marinas Contra Costa County 30
Primarily agricultural with commercial activities
RD 2026 Webb Tract and operation Contra Costa County 1
Primarily agricultural, with additional uses 12; may increase due
RD 2059 Bradford Island including residential and commercial activities Contra Costa County to seasonal residents
Agricultural, with some single-family dwellings,
RD 2065 Veale Tract farm worker housing, and outbuildings Contra Costa County 12-14
Wildlife conservation with one property used for
RD 2090 Quimby Island hunting Contra Costa County 0
Ch. 1 Executive Summary Policy Consulting Associates, LLC 23
Agricultural, supported by ancillary farm
buildings, a primary residence, and a caretaker
RD 2117 Coney Island residence Contra Costa County 4-6
Primarily marshland, with grassland and open
RD 2122 Winter Island water Contra Costa County 0
RD 2137 Dutch Slough Primarily tidal marsh and open space/habitat City of Oakley 0
Ch. 1 Executive Summary Policy Consulting Associates, LLC 24
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.7 According to the most recent Census
Bureau data, the statewide Median Household Income (MHI) for 2019-2023 is $96,334, and
hence, the calculated threshold of $77,067 defines whether a community is considered
disadvantaged.
DWR has developed a mapping tool to assist in determining which communities meet the
disadvantaged community's median household income definition. DWR is not bound by the
same law as LAFCO to define communities with a minimum threshold of 12 or more registered
voters. Because income information is not available for this level of analysis, disadvantaged
unincorporated communities with smaller populations that meet LAFCO’s definition cannot be
identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI).
According to the DWR Mapping Tool, there are no disadvantaged communities within ten of
the 12 reclamation districts, including the three RDs that have no residents. Meanwhile, a small
area in the northwest portion of RD 2065 along Delta Rd and Knightsen is considered a
disadvantaged community. In contrast, a large section of RD 799’s Sphere of Influence (SOI)
specifically, the area bordered by Dutch Slough to the north, E Cypress Rd to the south, Jersey
7 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 25
Island RD to the west, and Sandmound Blvd to the east, is considered a disadvantaged
community.
Although twelve RDs are reviewed in this MSR, RD 2122 no longer maintains any levees. The
District’s levees were breached as part of DWR’s Tidal Restoration Project, which aimed to
restore tidal connectivity and enhance wetland habitats on the island. As a result, RD 2122 no
longer performs any reclamation-related functions.
Figure 1-4 illustrates the services provided by the remaining eleven RDs. Services such as levee
maintenance, vegetation management, weed abatement, vector and rodent control, levee road
upkeep, and flood control are focused on maintaining and upkeeping levee systems. These
services are generally provided by all of the RDs, either directly, through contracted services, or
a combination of both. All of the districts also provide drainage and levee patrol services.
A few districts, including RD 830, RD 2024, and RD 799, are engaged in irrigation-related
activities. RD 830 manages irrigation using recycled water, while RD 2026 and RD 799 provide
irrigation infrastructure, such as floodgates, to support local agricultural operations.
Additionally, RD 2026 and RD 2059 operate the Victory II ferry service through the Delta Ferry
Authority (DFA), a Joint Powers Authority (JPA) that facilitates access from Jersey Island to both
Webb Tract and Bradford Island.
The configuration of services varies across the districts. Districts such as RD 2024, RD 2026, RD
2059, and RD 2065 primarily provide the majority of services through a mix of in-house staff
and contracted support. RD 799, RD 2026, and RD 2059 each employ a District Engineer and a
Superintendent on staff. Similarly, RD 2137 also employs a Superintendent, while RD 2024 hires
seasonal employees as needed.
Meanwhile, districts such as, RD 800 and RD 2090 are owned by a single landowner and rely on
the landowner for equipment and staffing. In contrast, RD 2065 and RD 2117 do not employ
dedicated staff for levee maintenance or infrastructure improvements and instead rely entirely
on contracted services. Many of the RDs also contract out for legal and accounting support.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 26
The services provided by the reclamation districts also vary depending on available funding,
mandatory maintenance standards for the type of levee maintained (project or non-project),
location in the Delta (primary or secondary zones), the land use of the protected property, and
the value of infrastructure on the protected property. For example, an area that is uninhabited
and largely agricultural will necessitate lower maintenance standards than a residential
subdivision where loss of life is a concern with levee failure.
RDs in Contra Costa County typically own limited assets and, therefore, rely heavily on various
collaborations to fulfill their operational needs.
Several districts with single or a few landowners rely directly on those landowners for
operational support. For example, RD 2090 and RD 830 depend on their respective landowners
to provide both staffing and equipment. RD 2117 receives similar support from Coney Island
Farms, a farming operation located within the District. RD 2024 stores its flood-fighting
materials at the Bixler Maintenance Yard, a facility owned by the East Bay Municipal Utility
District (EBMUD), whose aqueduct facilities cross the district property. While RD 2137 reports
that efficiencies are achieved through collaboration and facility-sharing efforts, including shared
equipment and personnel for levee maintenance activities with the two landowners: the City of
Oakley and DWR.
Other districts collaborate to reduce costs through shared expenses and strengthen operations.
For instance, RD 2025 and RD 2026 share a Board of Trustees with two reclamation districts in
San Joaquin County. RD 2025 also collaborates with RD 2090 to provide access to the island,
using barges to transport equipment. Furthermore, as mentioned earlier, RD 2026 and RD 2059
jointly operate the Victory II Ferry through the Delta Ferry Authority (DFA), a Joint Powers
Authority (JPA). Through the JPA, the Districts share operational costs for ferry services,
including repairs, dry dock maintenance, inspections, and administrative and accounting
support.
In addition to operational partnerships, several districts collaborate on administrative and
professional services. RD 2025, RD 2026, and RD 2137 share administrative facilities, legal
Ch. 1 Executive Summary Policy Consulting Associates, LLC 27
counsel, engineering services, and auditors with other reclamation districts in San Joaquin
County. This collaboration significantly reduces costs for all participating districts and improves
operational efficiency.
Most RDs have not identified any opportunities for further resource-sharing or collaborative
efforts. However, due to the rapid development activities within RD 799, the District plans to
establish various cooperative facilities with the City of Oakley, one of the land use authorities,
to facilitate the anticipated growth.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 28
Figure 1-4: Reclamation District Service Configuration
District Name
Ch. 1 Executive Summary Policy Consulting Associates, LLC 29
eeveL
ecnanetniaM
eganiarD
lortnoc
doolF
daoR
eeveL
peekpU
DEEW
TNEMETABA
/rotceV tnedoR lortnoC
lortaP
eeveL
gnithgif
doolF
noitagirrI
retaw epolS
noitcetorp
yrreF
noitarepo
RD 799 Hotchkiss Tract
RD 800 Byron Tract
RD 830 Jersey Island
Orwood and
RD 2024 Palm Tracts
RD 2025 Holland Tract
RD 2026 Webb Tract
RD 2059 Bradford Island
RD 2065 Veale Tract
RD 2090 Quimby Island
RD 2117 Coney Island
RD 2137 Dutch Slough
Service provided by contract
Service provided by the District
Service provided through JPA
Service provided by the district and contract
Service not provided
Ch. 1 Executive Summary Policy Consulting Associates, LLC 30
As shown in Figure 1-5, the entire levee system of RD 799, RD 830, and RD 2024 currently
meets or exceeds the minimum HMP standards. The remaining eight RDs are also nearing full
compliance, with 97 to 99 percent of their levee systems meeting or exceeding the HMP
standard.
Most of the districts have also made progress toward complying with the more stringent PL 84-
99 and Bulletin 192-82 standards. RD 2024 stands out, with approximately 98 percent of its
levee system meeting both PL 84-99 and Bulletin 192-82 standards. In addition, RD 2024 has
adopted a District Adopted Template (DAT), which supplements the existing standards to
enhance flood protection, improve flood-fighting capacity, and ensure long-term levee system
resilience.
RD 2024’s commitment to a higher level of protection may reflect the critical infrastructure
within the District’s boundaries, which includes statewide interests such as the East Bay
Municipal Utility District (EBMUD) aqueducts that supply water to 1.3 million people in Contra
Costa and Alameda Counties, along with the Burlington Northern Santa Fe Railroad (BNSF), the
Kinder Morgan fuel transmission line, PG&E gas transmission lines 57 A, B, and C, and the
Western Area Power Administration (WAPA) electrical transmission facilities that the District’s
levees protect.
In contrast, RD 2059 is the only district with no levee segments currently meeting the PL 84-99
or Bulletin 192-82 standards. However, once the District raises the remaining segments (about
600 feet) that currently fall below the HMP standard, it aims to undertake projects to meet the
PL 84-99 standard.
All districts have identified priority levee improvement projects in their respective Five-Year
Plans that align with their desired levels of protection. As shown in Figure 1-5, the majority of
districts, except for RD 2059, RD 2024, and RD 2137, have selected Bulletin 192-82 as their
desired level of protection. These districts have made some progress toward this goal, with
current compliance levels ranging from 20 to 66 percent.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 31
Notably, RD 2137 (Dutch Slough) is one of the two districts with a desired level of protection
that focuses on the continued maintenance of levees, including vegetation control and periodic
slope repairs to prevent erosion or degradation. Following the completion of the Dutch Slough
Restoration Project, which involved breaching the 5.2-mile Emerson and Gilbert perimeter
levees, RD 2137 now maintains approximately 3.1 miles of levees. This includes a 1.6-mile flood
control levee, constructed in 2020 using DWR’s Urban Levee Design Criteria, which provides a
200-year level of protection and meets HMP, PL 84-99, and Bulletin 192-82 standards. The
remaining 1.5 miles of district-maintained levees include the Marsh Creek West levee and the
levee at the southern end of Emerson Slough, which protects City of Oakley property and meets
the HMP standard.
Similarly, RD 800 (Byron Tract) plans to continue maintaining the current 100-year level of
protection and FEMA accreditation, while also addressing any specific geotechnical seepage or
stability issues that may be required.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 32
Figure 1-5: Compliance Status of Reclamation District Levee Systems (by Percentage)
District Name HMP PL 84-99 Bulletin 192-82 Desired Level of Protection
RD 799 Hotchkiss Tract 100% 45% 20% Bulletin 192-82
Maintain and improve levees
to ensure continued 100-year
flood protection and FEMA
RD 800 Byron Tract 51% 100% 48% accreditation
RD 830 Jersey Island 100% N/A 34% Bulletin 192-82
RD 2024 Orwood and Palm Tracts 100% 98% 98% District Adopted Template
RD 2025 Holland Tract 100% 85% 66% Bulletin 192-82
RD 2026 Webb Tract 100% 62% 32% Bulletin 192-82
Ensure the entire system
meets HMP; with a long-term
goal of meeting the PL 84-99
RD 2059 Bradford Island 98% 0 0 standard
RD 2065 Veale Tract 99% 27% 27% Bulletin 192-82
RD 2090 Quimby Island 97% 78% 62% Bulletin 192-82
RD 2117 Coney Island 99% 75% 54% Bulletin 192-82
Continued maintance of levees
to prevent erosion or
RD 2137 Dutch Slough 100% 51% 51% degradation
Ch. 1 Executive Summary Policy Consulting Associates, LLC 33
As discussed in Figure 1-6, most of the reclamation districts do not have significant
infrastructure needs. The main challenges identified by the districts include seepage, erosion,
and the need to raise sections of levees that fall below each district’s desired level of
protection. Due to funding constraints, the districts are primarily focused on routine operations
and maintenance while prioritizing projects that address these challenges as emergencies arise.
All of the districts except RD 2122, which no longer maintains levees or facilities and has shifted
away from its original reclamation functions, have prepared up-to-date Five-Year Plans. These
plans outline the current status of facilities (including levees and other flood control structures),
infrastructure needs, priority projects, and potential funding sources.
For most districts, the DWR Delta Levees Program, specifically, the Subventions and Special
Projects Programs, is the sole identified funding source for addressing these infrastructure
needs. Therefore, the districts will prioritize projects that need immediate attention based on
funding availability.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 34
Figure 1-6: Infrastructure Needs by Districts
District Name Infrastructure Needs
The levees protecting developed areas need improvements; however, existing encroachments
severely limit options for upgrading these levees and performing traditional levee work. Seepage
is also a challenge, affecting 30 percent of the District’s levee system, while 50 percent requires
erosion control measures. The District plans to address these challenges, prioritizing projects
RD 799 Hotchkiss Tract based on immediate needs and available funding.
No infrastructure needs have been identified; however, the District plans for continued
maintenance of levees, while also addressing any specific geotechnical seepage and/or stability
RD 800 Byron Tract issues that may be required.
The District has not identified any significant infrastructure needs. However, several sections of
the District levee, spanning approximately 8,417 feet, are near the minimum HMP criteria for
width and elevation. The District will continue to monitor these areas and perform maintenance
RD 830 Jersey Island activities to ensure they remain above the minimum HMP geometry criteria.
Although there are no significant infrastructure needs, the District is planning improvements to
levee infrastructure that focus on key projects aimed at mitigating encroachments, enhancing
levee stability, and improving emergency preparedness. These efforts will ensure compliance
with the District's Adopted Template (DAT), which, in addition to existing standards such as the
Hazard Mitigation Plan (HMP), DWR Bulletin 192-82, and PL 84-99, aims to provide a higher level
Orwood and Palm of protection, enhance flood-fighting capabilities, and ensure the long-term stability and
RD 2024 Tracts resilience of the levee system.
The District has not identified any immediate infrastructure needs; however, planned
infrastructure improvements include strengthening levee standards, armoring the waterside
slope on the east levee with rip rap, and monitoring potential low areas in the southern section
RD 2025 Holland Tract of the levee to ensure they continue to meet the minimum HMP elevation.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 35
The District has not identified any immediate infrastructure needs; however, planned
infrastructure improvements include strengthening levee standards, enhancing seepage control,
and ongoing monitoring of levee segments that are near the minimum HMP criteria for width
RD 2026 Webb Tract and elevation.
The District’s identified infrastructure needs include raising a 600-foot section of levee that sits
lower than surrounding areas and controlling significant seepage through sheet piles or French
drains. Additionally, the District plans to place riprap for waterside erosion protection, address
RD 2059 Bradford Island scour along False River, and continue ongoing levee maintenance and repairs.
The District continues to maintain levees to meet the minimum HMP standard; however, some
areas have only slight overbuilds. Ongoing material addition to the levee crown is necessary to
maintain this standard, while maintenance projects are conducted in priority areas to address
deficiencies. Overall, no significant improvements are required beyond maintaining the existing
RD 2065 Veale Tract drainage system and levees in accordance with federal and state standards.
The District has not identified any significant infrastructure needs. However, the District plans to
prioritize levee maintenance by adding quarry stone riprap above the existing riprap to any
RD 2090 Quimby Island waterside slope sections requiring additional rock slope protection.
The District has not identified any significant infrastructure needs. However, the District aims to
prevent erosion and reduce future repair needs by enhancing the existing levee's protection to
meet the Bulletin 192-82 Standard. This project will involve adding quarry stone riprap where
needed on the waterside slope. After completing this Rock Slope Protection project, the District
plans to raise portions of the levee, that currently fall below the Bulletin 192-82 Standard, six
inches above this standard to prepare the levee for potential future raises that may be necessary
RD 2117 Coney Island due to climate change and rising sea levels.
RD 2122 Winter Island The District no longer has a reclamation functions and maintains no levees or facilities.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 36
No infrastructure needs have been identified; however, the District plans for continued
maintenance of levees, including vegetation control and periodic slope repairs, to prevent
RD 2137 Dutch Slough erosion or degradation.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 37
RDs have several unique funding mechanisms. Operations of Contra Costa County reclamation
districts are financed for the most part only by a few funding sources that consist of
assessments and property taxes, and State assistance through DWR’s Delta Levees
Maintenance Subventions Program and Special Projects Program.
As shown in Figure 1-7, for FY 22–23, most districts relied primarily on assessments as their
main source of revenue. Notably, RD 2024 (Orwood and Palm Tracts) received 93 percent of its
funding from assessments. RD 2065 (Veale Tract) and RD 2026 (Webb Tract) followed, with
assessments making up 91 percent and 81 percent of their total revenue, respectively.
RD 800 (Byron Tract) was the only district to collect property taxes, which accounted for 59
percent of its total revenue. RD 2137 (Dutch Slough) was also an outlier, with 97 percent of its
revenue generated from state assistance.
As previously discussed, RD 2122 (Winter Island) no longer performs reclamation functions, and
the District is solely utilized as a restoration site by DWR, with 100 percent of its funding
provided through reimbursement grants from the DWR Real Estate Branch.
Other minor revenue sources across the districts include interest income, miscellaneous
reimbursements, and fees for permits or services. Notably, RD 2059 (Bradford Island) reported
that other income sources account for roughly 27 percent of its revenue, which includes
proceeds from fire insurance. The insurance income was received following a major fire in
August 2021 that caused significant damage to levee infrastructure and residential structures.
This income is not part of the District’s ongoing funding structure.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 38
Contra Costa Countywide Reclamation Services MSR
Administrative Draft
Figure 1-7: Revenue Sources by District by Percentage, FY 22-23
Property Reimbursement Other Income
District Name Assessments State Assistance Taxes Grants Sources
RD 799 Hotchkiss Tract 57% 5% 35% 3.7%
RD 800 Byron Tract 31% 9% 59% - 0.9%
RD 830 Jersey Island 59% 15% - 0.2%
Orwood and Palm
RD 2024 Tracts 93% 7% - 0.1%
RD 2025 Holland Tract 79% 17% - - 4%
RD 2026 Webb Tract 81% 18% 1%
RD 2059 Bradford Island 53% 20% - 27.5%
RD 2065 Veale Tract 91% 9% - -
RD 2090 Quimby Island 60% 40%
RD 2117 Coney Island 49% 48% 2% -
RD 2122 Winter Island - - 100% -
RD 2137 Dutch Slough 2% 97 - 1%
Policy Consulting Associates, LLC
Ch. 1 Executive Summary 39
As illustrated in Figure 1-8, the amount of revenue per levee mile varies greatly between the 11
districts. The revenue per levee mile ratio was calculated by dividing each district’s total
revenue, prior to other financing sources, by the total number of levee miles maintained.
The most notable outlier is RD 2137, which reported over $1.2 million in revenue per levee
mile. As of FY 22-23, the District reported the highest total revenue of $3,841,461 and the
shortest levee mileage (3.1 miles) among all districts reviewed, with funding derived solely from
state assistance and assessments. This inflated revenue is due to over 97 percent of the funds
coming from project-specific state assistance received through DWR work agreements likely for
the Dutch Slough Tidal Marsh Restoration Project. This funding inflates the District’s revenue, as
it is tied to specific projects rather than ongoing operations. In contrast, RD 2090 collected just
$3,561 per levee mile, reflecting the District's recurring annual budget of $25,000, which comes
from a single-landowner assessment structure and state assistance.
Other districts also show a wide range of revenue per mile. RD 800 (Byron Tract) stands out
with $109,080 per levee mile. While the District maintains the longest levee system at 18.9
miles, this relatively high revenue per mile is likely due to its multiple revenue sources, which
include property taxes, assessments, state assistance, and interest income.
RD 799 ($69,151) and RD 830 ($59,887) also report relatively high per-mile revenues while
maintaining longer levee systems of 14.9 and 15.5 miles, respectively, indicating a more stable
and diversified funding structure. In contrast, districts such as RD 2024 ($23,604), RD 2117
($13,966), and RD 2059 ($46,191) operate with more modest funding per levee mile, reflecting
more limited revenue sources.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 40
Figure 1-8: Contra Costa RDs Revenues per Levee Mile, FY 22-23
RD 2137
RD 2117
RD 2090
RD 2065
RD 2059
RD 2026
RD 2025
RD 2024
RD 830
RD 800
RD 799
$- $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000
Ch. 1 Executive Summary Policy Consulting Associates, LLC 41
As of FY 22–23, primary expenses across the districts included levee repairs, payroll,
engineering, utilities, and administrative services. As shown in Figure 1-8, total expenses per
levee mile varied widely among districts.
RD 2137 reported the highest expenses per levee mile, exceeding $1 million per levee mile. Of
the District’s total expense of $3,282,793 during the fiscal year, major categories included levee
repairs and maintenance, debt servicing for registered warrants, and engineering costs. Levee
repairs and maintenance alone accounted for $1,633,607 or nearly 50 percent of total
expenses. Similar to the revenues, these elevated costs were likely driven by activities
associated with the Dutch Slough Tidal Marsh Restoration Project.
In contrast, RD 2090 had the lowest expenses at approximately $3,561 per mile, consistent with
its recurring $25,000 annual budget. The District's expenses consist of superintendent salary,
subcontracted equipment rental, and insurance.
Other districts with higher expenses per levee mile, such as RD 2059 ($159,354), RD 2026
($128,459), and RD 800 ($123,887), had major expenses in payroll, utilities, and levee repairs. In
contrast, RD 2024, RD 2065, and RD 2117 had lower expenses per levee mile (after RD 2090),
reflecting more limited budgets, with spending focused primarily on essential services such as
utilities, insurance, and maintenance activities.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 42
Figure 1-9: Contra Costa RDs Expenditure per Levee Mile, FY 22-23
RD 2137
RD 2117
RD 2090
RD 2065
RD 2059
RD 2026
RD 2025
RD 2024
RD 830
RD 800
RD 799
$- $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000
Ch. 1 Executive Summary Policy Consulting Associates, LLC 43
The financial ability of the reviewed reclamation districts is marginally adequate based on their
capacity to maintain levees to an acceptable standard and generally finance agency operations.
However, the majority of the districts are constrained by the limited number of available
financing sources.
In FY 22–23, only RD 799, RD 830, RD 2025, RD 2026, and RD 2137 ended the fiscal year with a
surplus. RD 2025, RD 2026, and RD 2137 relied on short-term bank loans or registered warrants
to support cash flow. Although RD 2137 repaid all outstanding balances in registered warrants
at the end of the fiscal year and remained in surplus, RD 2025 and RD 2026 had outstanding
balances of $900,000 and $450,000, respectively, at the end of the fiscal year.
A key challenge for most districts is that their largest financing source, benefit assessments, is
subject to voter approval under Proposition 218 (Prop 218), a process that is often costly and
time consuming. Therefore, few districts have pursued this approach. In recent years, only RD
2026 has completed the Prop 218 process to raise sufficient revenue for operations,
maintenance, infrastructure improvements, and financial reserves. The District established a
new Prop 218-compliant benefit assessment in FY 23-24 to generate approximately $4.89
million annually to support infrastructure upgrades and build financial reserves. The District
reports that the new Levee and Flood Control Facilities Improvement Assessment has been
approved by the Board of Trustees and is currently in effect.
While RD 2059 also pursued Prop 218 vote in 2020, following the expiration of a prior
assessment, it failed, leading to a significant funding shortfall. To meet operational and
maintenance needs and achieve higher levee protection standards, the District plans to pursue
a new Prop 218-compliant assessment that would replace the existing assessment roll and
ensure long-term fiscal sustainability.
Rural districts, such as RD 2024, RD 2026, RD 2059, and RD 2117, face additional funding
challenges due to having few or no residents and being predominantly owned by a single or
limited number of landowners, which restricts the assessment revenue generated.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 44
Despite these constraints, most districts maintained positive fund balances by the end of FY 22–
23, as shown in Figure 1-10. RD 799 and RD 800 reported the largest fund balances with
$1,424,108 and $4,769,040, respectively. RD 799’s reserves are sufficient to cover one year and
six months of operating costs, while RD 800’s reserve could cover over six years and ten months
of operating costs, assuming expenses remain relatively stable.
RD 830, by contrast, utilizes net position reporting instead of fund balances. In FY 22-23, the
District reported an ending net position of $5,080,480, the largest among all the districts
reviewed, equivalent to six years and ten months of operating reserves.
It is important to note, however, that while increases and decreases in net position (the
amount by which an organization’s total assets exceed its total liabilities) are a useful indicator
of financial trends, it is not a direct measure of immediately available resources. Unlike fund
balances, a net position may include capital assets, such as infrastructure, and long-term
liabilities, which are not immediately accessible.
In contrast, RD 2025, RD 2026, and RD 2122 had both negative beginning and ending fund
balances. A recurring negative fund balance indicates that the district lacks sufficient reserves
to adequately cover operating costs or address unexpected expenses and revenue shortfalls.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 45
Figure 1-10: Contra Costa County RDs Fund Balance at the End of FY 22-23
Operating
Fund Balance /Net Fund Balance as % Expense
District Name position* of Revenue Coverage Period
Hotchkiss
RD 799 Tract $1,424,108 162% 1 yr 6 month
RD 800 Byron Tract $4,769,040 684% 6yr 10 month
RD 830 Jersey Island $5,080,480 684% 6yr 10 month
Orwood and
RD 2024 Palm Tracts $883,488 181% 1 yr 10 month
RD 2025 Holland Tract $(85,167) No Reserve
RD 2026 Webb Tract $(177,658) No Reserve
Bradford
RD 2059 Island $128,583 10% 1 month
RD 2065 Veale Tract $30,210 20% 2 month
No Reserve, follows a recurring $25,000
RD 2090 Quimby Island - budget cycle.
RD 2117 Coney Island $42,949 49% 6 month
RD 2122 Winter Island $(11,384) No Reserve
RD 2137 Dutch Slough $431,151 13% 1 month
Ch. 1 Executive Summary Policy Consulting Associates, LLC 46
Figure 1-11 illustrates the recommended governance structure options and Sphere of Influence
(SOI) updates for the 12 reclamation districts reviewed here.
As discussed earlier, RD 2122 (Winter Island) no longer maintains any levees or reclamation
functions as the island is solely managed by DWR as a restoration site, with the interior land
converted and the levee breached into a tidal marsh in 2019. The District is effectively inactive,
without facilities or staff; therefore, the dissolution of RD 2122 and adoption of a zero SOI to
reflect anticipated dissolution are recommended. If LAFCO decides on the dissolution of RD
2122, it must identify the effective date of dissolution, designate a successor agency to wind up
the affairs of the extinguished agency, and may apply other terms and conditions with its action
pursuant to GC §§56885–56890. Since DWR already owns and manages Winter Island for
habitat restoration, with operations funded through a reimbursement agreement with its Real
Estate Branch, LAFCO could potentially designate DWR as the successor agency. However, it is
unclear whether any precedent exists for designating DWR as a successor agency.
An update to the SOI is also recommended for RD 800 to reflect a recent detachment of
approximately 29 acres associated with the Pulte Group’s Pantages development project, as
approved in LAFCO Resolution 23-06.
For the remaining 10 reclamation districts, it is recommended that the current SOI is
reaffirmed, as there are no significant changes in population, land use, service demand, or
capacity that would necessitate an update to the districts’ boundaries.
An alternate governance structure option of establishing regional mutual aid is recommended
for all districts to formalize capacity and resource-sharing plans during emergencies to address
shared challenges in the Delta. This option was also recommended in the previous MSR;
however, since then, only RD 799 has implemented a mutual aid agreement with Bethel Island
Municipal Improvement District (BIMID). The agreement facilitates prompt emergency
response, including mutual assistance with levee and drainage maintenance and repair, as well
as reception services for displaced individuals, those forced to evacuate, or those in need of
Ch. 1 Executive Summary Policy Consulting Associates, LLC 47
assistance due to the breakdown of normal services, in the event that either district is affected
by or threatened with an emergency. Mutual aid agreements can significantly enhance
emergency response by providing additional personnel and specialized equipment, reducing
risks to infrastructure and human life during flood events. It is recommended that the RDs
explore this option to address shared challenges in the Delta region and strengthen community
resilience.
Alternatively, RDs such as RD 2137, RD 2025, and RD 2026 can further explore their existing
resource-sharing efforts with neighboring reclamation districts in Contra Costa and San Joaquin
counties to identify new opportunities for collaboration and cost-sharing. RD 2137 can also
further build on its current facility-sharing practices with DWR and the City of Oakley to identify
new opportunities for collaboration. Similarly, it is recommended that RD 2026 and RD 2059
consider building on their existing partnership for the Delta Ferry operation to formalize plans
for capacity and resource-sharing for reclamation services.
Additional governance structure options were identified for RD 2090 and RD 2137. RD 2090
(Quimby Island) is owned by Ellis Island Farms, Inc., an S corporation. In 2015, the corporation
donated an 80 percent interest in Ellis Island Farms, Inc., which includes Quimby Island, to the
California Waterfowl Association (CWA), a non-profit, for a wetland conservation easement.
CWA is a 501(c)(3) organization dedicated to enhancing California’s waterfowl populations and
wetlands and promoting hunter-conservationist communities. As discussed earlier, the District
does not own any assets and instead relies on Ellis Island Farms Inc. for its equipment.
Additionally, the district superintendent is also an employee of the corporation.
Due to the overlapping nature of RD 2090, Ellis Farm Inc., and the CWA, it is essential to
maintain clear distinctions in accounting, finances, and operations among these entities.
Currently, the District does not maintain a website; however, general information specific to
the District is available on multiple pages of the California Waterfowl’s website, including a
page that provides archived agendas and minutes for board meetings that occurred from 2014-
2019. It is recommended that a dedicated website for the District that offers relevant
information, such as bylaws, policies, planning documents, and important financial reports, is
Ch. 1 Executive Summary Policy Consulting Associates, LLC 48
established to improve transparency regarding the functions and operations of these closely
linked entities.
Another option identified is for the CWA to fully assume the RD functions as the 80 percent
owner of the island. However, it is important to consider the distinct legislative framework that
governs a nonprofit organization, such as the CWA, compared to a reclamation district. For
example, reclamation districts can levy assessments on a per-parcel basis depending on each
parcel's reclamation needs and charge fees for individual services. In contrast, nonprofits do
not have the statutory authority to levy assessments or impose fees.
The previous MSR also identified various governance structure options for RD 2137 that were
not implemented by the District for various reasons. First, it was recommended for the District
to be established as a subsidiary of the City of Oakley, which is one of the landowners, along
with DWR. However, this option is not feasible due to California Government Code §57105,
which requires that at least 70 percent of a district's land area and registered voters must be
within the city limits for a district to qualify as a subsidiary. In the case of RD 2137, the City of
Oakley owns only 55 acres of parkland within the District, which is a small portion compared to
the City's total area of 1,241 acres, indicating that it will not meet the required 70 percent
threshold.
Another option recommended was the dissolution of RD 2137 and the potential transfer of
responsibilities for the restoration of the Dutch Slough Tidal Marsh Restoration Project,
including the construction of any necessary new levees or the repair and maintenance of
existing levees, to the State of California (DWR) and/or the City of Oakley, designating them as
successor agencies. As noted, both the City of Oakley and DWR are landowners within RD 2137.
Therefore, any takeover of reclamation duties would require significant coordination.
Additionally, DWR primarily focuses on water supply management, and there are no precedents
for DWR fully replacing a reclamation district. Similarly, since the City of Oakley owns only 55
acres of RD 2137, a full takeover of reclamation functions by the City may not be feasible.
Additionally, while cities have general municipal powers, they do not have the automatic
authority to manage levees, drainage, or reclamation services, as these functions typically fall
Ch. 1 Executive Summary Policy Consulting Associates, LLC 49
under the jurisdiction of special districts (RDs) as defined in California Water Code Sections
50000-53901.
Finally, a governance option was proposed to consolidate all areas within the Dutch Slough
Tidal Marsh Restoration Project site under a single reclamation district, either through the
dissolution of RD 2137 and annexation to RD 799 or the detachment of the portion of the
Project area from RD 799 (the Burroughs parcel) and annexing it to RD 2137. This
recommendation was also not been implemented, and neither district has expressed interest in
pursuing this option.
Currently, the portion of the Project within the Burroughs parcel, which is within the RD 799
boundaries, is in the planning phase. Additionally, no direct impacts to RD 799 have been
observed from Project activities occurring within RD 2137 boundaries on the Emerson and
Gilbert parcels. Therefore, no reorganization efforts are recommended at this time
Ch. 1 Executive Summary Policy Consulting Associates, LLC 50
Figure 1-11: Recommended Governance Structure Options and SOI Update, Summary
SOI
District Name Governance Structure Options Recommendation
Regional mutual aid to address shared challenges in the delta through
RD 799 Hotchkiss Tract potential shared expenses Reaffirm SOI
Regional mutual aid to address shared challenges in the delta through
RD 800 Byron Tract potential shared expenses Amend SOI
Regional mutual aid to address shared challenges in the delta through
RD 830 Jersey Island potential shared expenses Reaffirm SOI
Orwood and Palm Regional mutual aid to address shared challenges in the delta through
RD 2024 Tracts potential shared expenses Reaffirm SOI
•Regional mutual aid to address shared challenges in the delta through
potential shared expenses.
•Identify further opptouinities to further collaborate with the contra costa
and San Joaquin county RDs that it currently share various resources such
as, administrative facilities, legal counsel, engineering services, and
RD 2025 Holland Tract auditors. Reaffirm SOI
•Regional mutual aid to address shared challenges in the delta through
potential shared expenses.
•Identify further opptouinities to further collaborate with the contra costa
and San Joaquin county RDs that it currently share various resources such
as, administrative facilities, legal counsel, engineering services, and
auditors.
•Build on the existing partnership with RD 2059 for the Delta Ferry and
RD 2026 Webb Tract formalize plans for capacity and resource-sharing for reclamation services. Reaffirm SOI
RD 2059 Bradford Island Reaffirm SOI
Ch. 1 Executive Summary Policy Consulting Associates, LLC 51
• Regional mutual aid to address shared challenges in the delta through
potential shared expenses.
•Build on the existing partnership with RD 2026 for the Delta Ferry and
formalize plans for capacity and resource-sharing for reclamation services.
Regional mutual aid to address shared challenges in the delta through
RD 2065 Veale Tract potential shared expenses Reaffirm SOI
•Regional mutual aid to address shared challenges in the delta through
potential shared expenses.
•Maintain clear distinctions in accounting, finances, and operations among
the three overlapping entities (the corporation, CWA, and RD 2090). For
example--establish a separate website dedicated to the district's
functions.
•CWA may take on the RD functions fully as the 80 percent owner of the
island. However, must consider the legislative framework and
the statutory authority that nonprofits vs reclamation districts operate
RD 2090 Quimby Island within. Reaffirm SOI
Regional mutual aid to address shared challenges in the delta through
RD 2117 Coney Island potential shared expenses Reaffirm SOI
The Island is solely managed by the DWR as a restoration site, with the
interior land converted/ levee breached into a tidal marsh in 2019. District
is effectively inactive—without facilities or staff—the dissolution of RD
RD 2122 Winter Island 2122 is recommended. Adopt Zero SOI
•Regional mutual aid to address shared challenges in the delta through
potential shared expenses.
•Identify further opptouinities to further collaborate with the contra costa
RD 2137 Dutch Slough and San Joaquin county RDs that it currently share various resources such Reaffirm SOI
Ch. 1 Executive Summary 52
Policy Consulting Associates, LLC
as, administrative facilities, legal counsel, engineering services, and
auditors.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 53
Overall, the reclamation districts reviewed as part of this MSR demonstrated accountability in
their disclosure of information and cooperation with LAFCO questionnaires and other requests
for information.
Most of the RDs are governed by a three-member Board of Trustees, while four districts have
five-member boards. RD 2024, which has a five-member board, has one vacant seat. The
District reports that, due to liability and regulatory concerns, there is a lack of interest among
landowners, making it difficult to fill the position. According to Government Code Section 1780,
vacancies can be filled by appointment from the remaining Trustees or the County Board of
Supervisors.
Seven of the twelve districts reviewed hold board meetings on an as-needed basis. In contrast,
RD 799, RD 800, RD 2026, and RD 2059 hold monthly board meetings, while RD 2024 holds
approximately four meetings annually. In accordance with the Brown Act (Government Code §§
54954.2 and 54956), as amended by California AB 2257, local agencies are required to post
meeting agendas at least 72 hours prior to regular meetings and at least 24 hours prior to
special meetings. All of the RDs, with the exception of RD 2122, which no longer performs any
reclamation functions, comply with this requirement by posting agendas on their website.
Several districts maintain additional meeting records, such as archives of meeting agendas and
minutes, on their websites. RD 800 and RD 2024 provide agenda packets and minutes for
meetings dating back to 2021, while RD 2025, RD 2026, and RD 2059 offer archives beginning in
2020. Other districts offer limited records; for example, RD 2137 has maintained agenda
packets since 2023, and RD 2117 has an archive of agendas and minutes from 2021-2023. RD
799 also makes agenda packets and minutes available for meetings held since 2022; however,
some agendas from 2022 and 2023 are not readily available.
RD 830 and RD 2090 make past meeting records available on their respective landowners'
websites, ISD, and California Waterfowl. However, it is recommended that both districts
Ch. 1 Executive Summary Policy Consulting Associates, LLC 54
establish independent websites to clearly distinguish their functions from those of their
landowners.
Overall, it is recommended that the RDs ensure that all current and past agenda packets and
meeting minutes are available on their websites to further enhance transparency.
With the exception of RD 830 and RD 2090, all of the districts maintain their own websites.
Since the 2015 MSR, RD 2024, RD 2137, RD 2117, and RD 2065 have launched websites that
make general information, contact details, and other relevant documents available in
compliance with Senate Bill 929 (the Special Districts Transparency Act), passed in 2018, which
requires every independent special district to maintain an internet website beginning January 1,
2020, unless the governing board adopts a resolution declaring its determination that a
hardship exists that prevents the district from establishing or maintaining a website. The Act
outlines the minimum information required to be available on the website.
Furthermore, the previous MSR recommended developing a shared website for Contra Costa
County reclamation districts, potentially hosted by the County, LAFCO, or a district consortium,
to enhance transparency. Currently, the Contra Costa Special Districts Association website
provides general information on each district through its Municipal Improvement and
Reclamation Districts page. It is recommended that the website is routinely updated to reflect
current information and include direct links to each district's website.
Additional recommendations were identified in this MSR for the RDs to improve financial
transparency by ensuring that key documents, such as annual budgets, financial audits,
Compensation Reports, and State Controller's Office Financial Transaction Reports, are posted
and up to date on their websites. Of the eleven active RDs, ten conduct timely annual audits in
accordance with Government Code §26909(a), which mandates that special districts must have
an annual audit conducted by a certified public accountant or public accountant and submit the
audits to the State Controller, the County Auditor, and LAFCO within 12 months after the end of
the fiscal year.
RD 2090 is the only district that has not prepared annual audits in recent years due to
accounting staff turnover. According to the District's most recent budget, annual revenue is
Ch. 1 Executive Summary Policy Consulting Associates, LLC 55
under $150,000, which qualifies under Government Code §26909(c)(1) to opt for a financial
review or agreed-upon procedures instead of a full annual audit, provided a unanimous
approval is received from both the district's governing board and the County's board of
supervisors. In January 2025, the County's Board of Supervisors approved RD 2090's request to
submit a five-year audit in lieu of the required annual audits, as permitted under §26909(c)(2),
which mandates a full audit at least once every five years. RD 2090 has reported that an audit is
currently in progress.
To ensure ongoing compliance, it is recommended that RD 2090 perform annual financial
reviews or agreed-upon procedures, with required approvals, if the District continues to opt out
of annual audits.
Ch. 1 Executive Summary Policy Consulting Associates, LLC 56
2 .
LAFCO regulates boundary changes proposed by public agencies or individuals through
approval, denial, conditions, and modification. It also regulates the extension of public services
by cities and special districts outside their boundaries. LAFCO is empowered to initiate updates
to the SOIs and proposals involving the dissolution or consolidation of special districts, mergers,
the establishment of subsidiary districts, and any reorganization, including such actions.
Otherwise, LAFCO actions must originate as petitions or resolutions from affected voters,
landowners, cities, or districts.
The Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000 requires LAFCO to
review and update SOIs every five years, or as necessary, and to review municipal services
before updating SOIs. The requirement for service reviews arises from the identified need for a
more coordinated and efficient public service structure to support California’s anticipated
growth. The service review provides LAFCO with a tool to study existing and future public
service conditions comprehensively and to evaluate organizational options for accommodating
growth, preventing urban sprawl, and ensuring that critical services are provided efficiently.
Government Code §56430 requires LAFCO to conduct a review of municipal services provided in
the county by region, sub-region, or other designated geographic area, or by type of service, as
appropriate, for the service or services to be reviewed, and prepare a written statement of
determination with respect to each of the following topics:
• Growth and population projections for the affected area;
• The location and characteristics of any disadvantaged unincorporated communities
(DUCs) within or contiguous to the SOI;
• Present and planned capacity of public facilities and adequacy of public services, including
infrastructure needs or deficiencies (including needs or deficiencies related to sewers,
Ch. 2 Background Policy Consulting Associates, LLC 57
municipal and industrial water, and structural fire protection in any DUCs within or
contiguous to the sphere of influence);
• Financial ability of agencies to provide services;
• Status of and opportunities for shared facilities;
• Accountability for community service needs, including governmental structure and
operational efficiencies; and
• Any other matter related to effective or efficient service delivery, as required by
commission policy.
The MSR process does not require LAFCO to initiate changes in an organization based on service
review findings, only that LAFCO identifies potential government structure options. However,
LAFCO, other local agencies, and the public may subsequently use the determinations to
analyze prospective changes in organization or reorganization or to establish or amend SOIs.
Within its legal authorization, LAFCO may act with respect to a recommended change of
organization or reorganization on its initiative (e.g., certain types of consolidations) or in
response to a proposal (i.e., initiated by resolution or petition by landowners or registered
voters). MSRs are exempt from the California Environmental Quality Act (CEQA) pursuant to
§15306 (information collection) of the CEQA Guidelines. LAFCO’s actions to adopt MSR
determinations are not considered “projects” subject to CEQA.
The Commission is charged with developing and updating the SOI for each city and special
district within the county. SOIs must be updated every five years or as necessary. In
determining the SOI, LAFCO is required to complete an MSR and adopt the seven
determinations previously discussed.
An SOI is a LAFCO-approved plan that designates an agency’s probable future boundary and
service area. Spheres are planning tools used to provide guidance for individual boundary
change proposals and are intended to encourage the efficient provision of organized
Ch. 2 Background Policy Consulting Associates, LLC 58
community services and prevent duplication of service delivery. Territory cannot be annexed by
LAFCO to a city or a district unless it is within that agency's sphere.
The purposes of the SOI include the following: to ensure the efficient provision of services,
discourage urban sprawl and premature conversion of agricultural and open space lands, and
prevent overlapping jurisdictions and duplication of services.
LAFCO cannot regulate land use, dictate internal operations or administration of any local
agency, or set rates. LAFCO is empowered to enact policies that indirectly affect land use
decisions. On a regional level, LAFCO promotes the logical and orderly development of
communities as it considers and decides individual proposals. LAFCO has a role in reconciling
differences between agency plans so that the most efficient urban service arrangements are
created for the benefit of current and future area residents and property owners.
The Cortese-Knox-Hertzberg (CKH) Act requires to develop and determine the SOI of each local
governmental agency within the county and review and update the SOI every five years.
LAFCOs are empowered to adopt, update, and amend the SOI. They may do so with or without
an application and any interested person may submit an application proposing an SOI
amendment.
LAFCO may recommend government reorganizations to particular agencies in the county, using
the SOIs as the basis for those recommendations.
In addition, in adopting or amending an SOI, LAFCO must make the following determinations:
• Present and planned land uses in the area, including agricultural and open-space lands;
• Present and probable need for public facilities and services in the area;
• Present capacity of public facilities and adequacy of public service that the agency
provides or is authorized to provide;
• Existence of any social or economic communities of interest in the area if the Commission
determines these are relevant to the agency; and
• Present and probable need for water, wastewater, and structural fire protection facilities
and services of any DUCs within the existing sphere of influence.
Ch. 2 Background Policy Consulting Associates, LLC 59
By statute, LAFCO must notify affected agencies 21 days before holding the public hearing to
consider the SOI and may not update the SOI until after that hearing. The LAFCO Executive
Officer must issue a report including recommendations on the SOI amendments and updates
under consideration at least five days before the public hearing.
LAFCO is required to evaluate disadvantaged unincorporated communities (DUCs) as part of
this service review, including the location and characteristics of any such communities.
The purpose of Senate Bill (SB) 244 (Wolk, 2011) is to begin to address the complex legal,
financial, and political barriers that contribute to regional inequity and infrastructure deficits
within DUCs. Identifying and including these communities in the long-range planning of a city or
a special district is required by SB 244.
The CKH requires LAFCO to make determinations regarding DUCs when considering a change of
organization, reorganization, sphere of influence expansion, and when conducting municipal
service reviews. For any updates to an SOI of a local agency (city or special district) that
provides public facilities or services related to sewer, municipal and industrial water, or
structural fire protection, LAFCO shall consider and prepare written determinations regarding
the present and planned capacity of public facilities and adequacy of public services, and
infrastructure needs or deficiencies for any DUC within or contiguous to the SOI of a city or
special district.
CKH prohibits LAFCO from approving an annexation to a city of any territory greater than 10
acres if a DUC is contiguous to the proposed annexation, unless an application to annex the
DUC has been filed with LAFCO. An application to annex a contiguous DUC shall not be required
if a prior application for annexation of the same DUC has been made in the preceding five years
or if the Commission finds, based upon written evidence, that a majority of the registered
voters within the affected territory are opposed to annexation.
Ch. 2 Background Policy Consulting Associates, LLC 60
Government Code (GC) §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged
community” as defined by §79505.5 of the Water Code, and as 2) “inhabited territory” (12 or
more registered voters), as defined by §56046, or as determined by commission policy.
Ch. 2 Background Policy Consulting Associates, LLC 61
3 .
The Sacramento-San Joaquin Delta is part of the largest estuary on the west coast of North and
South America. The Sacramento-San Joaquin Delta is formed by the confluence of the state’s
two largest rivers: the Sacramento, flowing south from its headwaters near Mount Shasta, and
the San Joaquin, flowing north from its origins high in the southern Sierra Nevada. Joining the
Sacramento and San Joaquin are the Mokelumne, Cosumnes, and Calaveras rivers. These rivers
and their tributaries carry about half of the state’s total annual runoff. Freshwater from the
rivers mingles with saltwater from the San Francisco Bay and Pacific Ocean’s tides, forming the
largest estuary on the west coast of North America. The Delta and Suisun Marsh (together, "the
Delta")8 include more than 1,100 miles of levees and 140 leveed islands and tracts. Suisun
Marsh9 is where fresh water from the Sacramento-San Joaquin Delta mixes with salt water from
San Francisco Bay.
The Delta plays a major role in the economy, natural environment, and human environment of
San Joaquin County, as well as the entire State of California. The Delta also provides a portion of
the water supply for two-thirds of Californians, 6 million acres of farmland, a variety of
industrial purposes, and commercial and recreational fishing and boating businesses. The Delta
watershed is home to nearly 100 California Native American tribes that rely upon these
waterways, the surrounding lands, and the native fish and fauna for subsistence, cultural, and
religious purposes. In addition, the Delta watershed is important to local communities for a
variety of purposes, including quality of life, drinking water, subsistence fishing, and
recreation.10
8 California Code of Regulations (CCR), Title 23, 5001(k).
9 The 116,000-acre marsh is the largest contiguous brackish-water wetland in California and perhaps the entire western coast of
North America, providing food and habitat for thousands of migratory birds on the Pacific Flyway and many species of plants,
fish, and wildlife.
10 California Water Boards, Draft Staff Reports in Support of the Sacramento/ Delta Update to the Bay-Delta Water Quality
Control Plan.
Ch. 3 Overview Policy Consulting Associates, LLC 62
In 2019, the United States Congress established the Sacramento-San Joaquin Delta National
Heritage Area (NHA), which runs from the east side of San Pablo Bay through the Carquinez
Strait to the Delta. Recognized as a cohesive, nationally significant landscape arising from
patterns of human activity shaped by the Delta's geography, the Delta is California's first
National Heritage Area (NHA).
The Delta is the hub of state, federal, and local water systems that provide at least a portion of
the water supply needs for two-thirds of all Californians, or about 27 million people. Water
diversions directly from the Delta include the State Water Project, the federal Central Valley
Project, the Contra Costa Canal, the North Bay Aqueduct, the City of Vallejo, and the Western
Delta Industry.
Two primary conduits were constructed in the 20th Century to move water from northern
sources in the Sierras to mostly southern areas of urban and agricultural demand. The Central
Valley Project (CVP) was constructed by the US Bureau of Reclamation in the 1930s to transport
water from Lake Shasta in the north, providing irrigation and drinking water to portions of the
Bay Area and the arid southern San Joaquin Valley. The State Water Project (SWP) was
constructed in the 1960s and 1970s by the California Department of Water Resources (DWR) to
supply drinking and irrigation water, as well as industrial uses, to millions of people and
hundreds of thousands of acres in agriculture in the San Francisco Bay Area, San Joaquin Valley,
Central Coast, and Southern California. The hub of the whole system converges in the
Sacramento-San Joaquin Delta.
The Sacramento-San Joaquin Delta supports a diversity of recreation experiences generating a
total of roughly 12 million visitor days of use annually, of which approximately 8 million were
resource-related (e.g., boating and fishing) visitor days of use per year, 2 million urban parks-
related (e.g., golf, picnic, and turf sports), and 2 million right-of-way-related (e.g., bicycling and
driving for pleasure) recreation visitors per year. According to the updated Economic
Ch. 3 Overview Policy Consulting Associates, LLC 63
Sustainability Plan for the Delta, recreation has a direct economic impact of more than $200
million dollars in spending per year.
Delta’s recreation and tourism supports about 3,800 jobs across all of California, a decline of 28
percent of the estimated 5,300 statewide jobs supported in 2012. The sector contributes about
$280 million in value-added, compared to approximately $350 million in 2012, a decline of 20
percent.11
The Delta offers 290 shoreline recreational areas, 300 marinas, 57,000 navigable waterways,
and more than 20 species of sport fish. The Delta is also home to more than 750 species of
plants and wildlife, including 55 species of fish.
In addition to agriculture and water supply, the Delta provides habitat and riparian areas for
wildlife. Riparian systems provide several important functions to both the aquatic and
terrestrial ecosystems associated with them. These include, but are not limited to, stream bank
stabilization, flow moderation and flood control, sediment control, organic matter necessary to
support aquatic communities, water quality improvement by filtration, temperature
moderation by shading, and stream structural diversity. Riparian habitats support a great
diversity of wildlife, including sensitive invertebrates, amphibians, reptiles, birds, and mammals.
An estimated 25 percent of all warm water and anadromous sport fishing species and 80
percent of the State’s commercial fishery species live in or migrate through the Delta, and at
least half of the Pacific Flyway migratory water birds rely on the region’s wetlands.
Finally, the Delta, including parts in Contra Costa County, has designated "critical habitat" areas.
This term is defined in the Endangered Species Act and is used by the U.S. Fish and Wildlife
Service (USFWS) and the National Marine Fisheries Service to describe areas essential for the
conservation and recovery of federally threatened or endangered species that require special
management and protection. It may include areas not currently occupied by these species but
critical for their recovery. Critical habitats are designated to ensure that actions authorized by
11 Economic Sustainability Plan for the Sacramento-San Joaquin Delta, Recreation and Tourism Chapter. 2020 Update. p.59-60.
Ch. 3 Overview Policy Consulting Associates, LLC 64
federal agencies will not destroy or adversely modify these habitats, thereby protecting areas
necessary for the species' conservation. However, not all federally listed species have
designated critical habitats.
Three state agencies regulate, conserve, and protect the Sacramento-San Joaquin Delta: Delta
Stewardship Council, Sacramento-San Joaquin Delta Conservancy, and Delta Protection
Commission.12 Each agency plays a distinct role in managing the Delta’s resources, land use,
and long-term sustainability.
• Delta Stewardship Council— The Council is the largest of the three agencies, operating
independently as the authority responsible for developing and enforcing the Delta Plan,
a long-term, science-based management strategy. The agency facilitates, coordinates,
and integrates the activities of numerous local, state, and federal agencies involved in
water management, ecosystems, and Delta communities. The Council also established
and oversees the Delta Plan Interagency Implementation Committee (DPIIC) to
coordinate the efforts of various agencies responsible for carrying out the Delta Plan
adopted in 2013. The Council continues to coordinate and oversee these activities as
required by the Delta Reform Act.
• Sacramento-San Joaquin Delta Conservancy— The Conservancy leads efforts to preserve,
protect, and restore the natural resources, economy, and agriculture of the Delta through
internal programs and grant-funded projects.
• Delta Protection Commission— Established under the Delta Protection Act of 1992, the
Commission's primary authority is over land use in the Delta's unincorporated areas. The
Commission coordinates the Sacramento-San Joaquin Delta National Heritage Area and
leads the development of the Great California Delta Trail System. It contributes research,
coordination, and expertise to advance Delta-wide goals, including economic
sustainability, improving broadband access, and community planning for legacy
12 Delta Stewardship Council.
Ch. 3 Overview Policy Consulting Associates, LLC 65
communities, and partners with the Delta Leadership Foundation to foster the next
generation of leaders in the Delta.
In 2009, the Delta Reform Act established coequal goals of improving water supply reliability
and enhancing ecosystem resiliency that should be pursued in a manner that protects and
enhances the Delta as an evolving place. The Act also created the Delta Stewardship Council
and the Delta Conservancy and established a state policy to reduce reliance on the Delta in
meeting California's future water supply needs.
Each of these agencies collaborates with other state, federal, and local agencies to achieve the
coequal goals.
Today, Delta levees protect farms, cities, schools, and people from flooding and related
hazards. It consists of approximately 57 major reclaimed islands surrounded by about 1,100
miles of levees and numerous Channel Islands without levees.
The Delta drains a watershed comprising 40 percent of California’s landmass, which means that
during storm events, a huge volume of water flows into the Delta. Unlike upstream levees, such
as those protecting the City of Sacramento, which are mainly under stress during high water
events, levees in the Delta are under constant pressure. Because Delta peat soils are prone to
wind erosion and oxidation when exposed to air through plowing and fires, many Delta islands
are subject to subsidence.
Drainage of land in the Sacramento-San Joaquin Delta has caused extensive oxidation of peat
soils, lowering approximately 386 square miles of land from 10 ft to as much as 29 ft below sea
level. Current rates of subsidence (loss of land elevation due to oxidation of peat soils) in the
Delta range from 0.2 to more than 0.8, depending on the location and specific conditions of the
soil.13
13 Managing Subsided Lands in the Sacramento-San Joaquin Delta, Delta Independent Science Board. Final Prospectus. August 4,
2023.
Ch. 3 Overview Policy Consulting Associates, LLC 66
The greatest stresses to the levees in the Delta occur when a large storm coincides with high
tides. Water levels in Delta channels are elevated by the high stormwater flows, high tides, and
even the low air pressures associated with storms. In addition, the levees must withstand
erosion from wind-induced waves. Under these circumstances, levees can fail from overtopping
when water levels become higher than the top of the levees and flow over them onto the
islands, and from collapse caused by increased pressure due to island subsidence, the
burrowing activities of animals, long-term erosion from high flow events, wind-induced waves,
boat wakes, deferred maintenance, the seepage of water through sand layers beneath the
levee, and other factors not yet well understood.
Over several decades, the competing demands for the Delta to provide both habitat and water
supply have impaired its ability to meet either need. These needs particularly clash during dry
years when there is simply less water available. Many factors continue to threaten the Delta's
health, including pollution from agricultural, industrial, and urban runoff. Invasive, non-native
species adversely affect the food chain, leading to declines in native fish and wildlife
populations. Gradual changes such as sea-level rise, rising water temperatures due to climate
change, and additional invasions of exotic species are also transforming the ecosystem in ways
that are difficult to anticipate or manage.14
Demands on the Delta’s resources are expected to increase, driven by climate change, changes
in land use patterns, alterations in water demand, and the continuing subsidence of some
islands. The combination of sea-level rise and changes in hydrology, which may lead to higher
peaks in runoff levels, increases the likelihood of multiple island failures. Such failures extend
the time needed to repair levees and increase flooding damage, raising the risk that some
islands may become irrecoverable. Over time, the probability of a significant seismic event in
the Bay Area or Delta region increases, raising the risk of catastrophic levee failures.
California’s Fourth Climate Change Assessment conducted in 2018 indicates that higher sea
levels, subsidence, and increased flooding are serious threats to Delta levees, exacerbating risks
to native species, ecosystems, and water supply systems. Rising temperatures and salinity
14 Delta Stewardship Council, Frequently Asked Questions.
Ch. 3 Overview Policy Consulting Associates, LLC 67
threaten habitats and agricultural productivity while triggering a need for more intense water
treatments for those using water exported from the Delta. The reduced reliability of the levee
system increases the vulnerability of homes, roads, bridges, pipelines, and agricultural fields on
Delta islands to flooding risks, especially with a growing population that raises the number of
people and properties at risk from levee failures.
Urbanization also degrades the ecosystem by increasing pollutant levels from urban runoff and
wastewater discharges, further challenging local agencies to restore habitat, implement flood
management strategies, and improve water supply systems. Additionally, levee failures
increase maintenance costs, requiring levees to be raised in height and width to avoid being
overtopped by rising sea levels and higher spring runoff flows.
The 1959 Delta Protection Act15 established the legal boundary of the Delta which spans about
738,000 acres in Northern California at the western edge of the Central Valley.
The 1992 Johnston-Baker-Andal-Boatwright Delta Protection Act refined the legal boundary of
the Delta by designating Primary and Secondary Zones. The Primary Zone, statutorily defined as
comprising “Delta land and water area of primary state concern and statewide significance,”
comprises approximately 500,000 acres of waterways, levees, and farmed lands in all the Delta
counties. The primary zone is where agriculture, wildlife, and recreation use are permitted, and
development is highly restricted.
The Secondary Zone, which includes the cities of Stockton, Lathrop, Tracy, Oakley, and West
Sacramento, is part of the Delta where development can occur. Development projects in the
Secondary Zone are primarily subject to local land use decisions.
The entire Delta region, including both the Primary Zone and Secondary Zone, is referred to as
the Legal Delta.16
15 California Water Code §12220.
16 Economic Sustainability Plan for the Sacramento-San Joaquin Delta, Delta Protection Commission. January 19, 2012. p.13-15.
Ch. 3 Overview Policy Consulting Associates, LLC 68
As shown in Figure 3-1, the Delta, including both the Primary Zone and Secondary Zone,
contains significant portions of five counties, Contra Costa, Sacramento, San Joaquin, Solano,
and Yolo, and a small rural corner of Alameda County. The Delta also includes parts of several
large cities, including Antioch, Pittsburg, Stockton, Sacramento, Tracy, and West Sacramento.
Ch. 3 Overview Policy Consulting Associates, LLC 69
Figure 3-1: Primary and Secondary Zones of the Sacramento-San Joaquin Delta
Ch. 3 Overview Policy Consulting Associates, LLC 70
East Contra Costa County covers a large area within the southwestern Delta. The entire
northern border of the County is bound by a waterfront that flows from the Delta to the San
Francisco Bay.
Contra Costa communities of Bay Point, Bethel Island, Discovery Bay, and Knightsen are entirely
within the Delta. While the cities of Antioch, Brentwood, Oakley, and Pittsburg, as well as the
town of Byron, are partially within the Delta.
While the majority of the Delta is rural, comprised of farms and small towns, the edges are
more urban, with higher-density developments and residents who commute for employment.
The primary zone encompasses much of the agriculturally focused land, while the secondary
zone is more urban-influenced and includes the Delta's cities and the majority of Delta’s
population.
Per the Delta Protection Act of 1992, the Delta Protection Commission (DPC) was established to
plan for and guide the conservation and enhancement of the natural resources of the Delta
while sustaining areas in the center of the Legal Delta. The Secondary Zone is the area outside
the Primary Zone and within the "Legal Delta”; the Secondary Zone is not within the planning
area of the DPC.
The Delta Protection Act requires the DPC to prepare, adopt, review, and maintain a
comprehensive long-term resource management plan for land uses within the Primary Zone.
The plan describes the needs and goals of the Delta and presents a statement of the policies,
standards, and elements of the plan. The Land Use and Resource Management Plan for the
Primary Zone of the Delta was adopted in 1995 and updated in 2010.17
In 1993, each of the counties with lands within the Primary Zone supported agriculture, wildlife
habitat, and recreation on Primary Zone lands. The unincorporated communities in the Primary
Zone each have their own community plans/special area plans. These communities are
Clarksburg in Yolo County and Courtland, Locke, and Walnut Grove in Sacramento County. The
17 Economic Sustainability Plan for the Sacramento-San Joaquin Delta, Delta Protection Commission. January 19, 2012. p.49.
Ch. 3 Overview Policy Consulting Associates, LLC 71
City of Isleton is the only incorporated city in the Primary Zone and has its own general plan.
Local government general plans do not apply to state or federal projects.
After the DPC adopted its original Land Use and Resource Management Plan for the Primary
Zone of the Delta, each county and city was required to ensure that its general plan was
consistent with the DPC's plan. All of the county and city general plans covering the Primary
Zone were determined to be consistent with the DPC's plan although each county addresses
these land uses and their protection in ways reflecting their community values and local history.
Figure 3-2 illustrates land uses within Delta designated by city and county general plans. Within
cities' spheres of influence, the map shows land use designations proposed in city general
plans, where available. In cases where cities have not proposed land uses within their spheres
of influence, the map shows land uses designated by county general plans.
Ch. 3 Overview Policy Consulting Associates, LLC 72
Figure 3-2: Sacramento-San Joaquin Delta, Land Uses18
18 Sources: City of Benicia 2003, Contra Costa County 2008, Contra Costa County 2010, DWR 2011b, DWR 2011c, DWR 2011d,
City of Fairfield 2008, Jones & Stokes 2007, City of Lathrop 2012, City of Manteca 2012, Mountain House Community Services
District 2008, City of Rio Vista 2001, SACOG 2009, City of Sacramento 2008, Sacramento County 2011, Sacramento County 2012,
Sacramento County 2013, San Joaquin County 2008a, San Joaquin County 2008b, Solano County 2008a, Solano County 2008b,
South Delta Levee Protection and Channel Maintenance Authority
2011, City of Stockton 2011a, City of Stockton 2011b, City of Suisun City 2011, City of Tracy 2011a, City of Tracy 2011b, City of
West Sacramento 2010, Yolo County 2010a, Yolo County 2010b.
Ch. 3 Overview Policy Consulting Associates, LLC 73
Contra Costa County has adopted an urban limit line (ULL) that limits urban development to
certain areas and helps preserve farmland and open space. While portions of the Secondary
Zone within Contra Costa County are within the ULL, the Primary Zone within Contra Costa
County is outside the ULL due to flood hazards, soil subsistence, a lack of infrastructure, and a
Ch. 3 Overview Policy Consulting Associates, LLC 74
lack of services. The areas to the north and east are designated Delta Recreation and Resources
areas, and portions of the Primary Zone are designated General Agriculture.
Contra Costa County has a Land Preservation Plan Ordinance to maintain a specific ratio
between developed land and open space land: 65 percent of the county will be preserved for
agriculture, open space, wetlands, parks, and other nonurban uses, while 35 percent may be
used for urban development. This ratio was originally adopted by the voters in November 1990
and renewed by voters in November 2006. The Primary Zone is within the area to remain in
open space and low-intensity uses.
The Contra Costa General Plan uses various zoning codes to identify and protect the unique
Delta land uses and characteristics of the Primary Zone lands in Contra Costa County. Most
Delta islands and surrounding tracts are designated as a special Delta Recreation and Resources
Zone, recognizing their location within the 100-year floodplain, limited services, and value for
agriculture, wildlife habitat, and low-intensity recreation. In these areas, agricultural uses are
allowed, and with a use permit, recreational uses such as marinas, hunting clubs, campgrounds,
and other outdoor activities are permitted. The minimum parcel size is 20 acres.
Publicly owned parkland and golf courses are designated as Parks and Recreation.
Transportation and utility corridors are classified as Public Facilities. Water-based activities such
as, docks, boating, and fishing are allowed in designated water areas. Publicly owned land,
wetlands, tidelands, and ecologically significant areas are designated as Open Spaces. The areas
west of Veale and Hotchkiss Tracts are designated as Agricultural Land, with existing parcels
ranging from 10 to 50 acres. Jersey Island is designated Public/Semi-Public and has been used
for treated wastewater disposal.
The County’s agricultural core consists of prime soils, considered the best for farming various
crops, and is located east, south, and west of Brentwood. Intensive row crops are grown in
much of this area, and part of it lies within the 100-year floodplain. The agricultural core
designation aims to preserve and protect the county's most productive farmlands, with a higher
minimum parcel size to discourage "ranchette" development, which typically includes small
rural residential lots. Uses in the agricultural core are similar to those in the Agricultural Land
Ch. 3 Overview Policy Consulting Associates, LLC 75
designation, though wineries and olive oil mills may be allowed with a use permit. Residential
density is limited to one unit per 40 acres.19
The Contra Costa County is currently in the process of updating the General Plan through the
Envision Contra Costa 2040 project. Per the draft 2045 General Plan, the Land Use element has
the following policies related to Delta.20
• LU-P5.1— Ensure that County projects and decisions on private development and land
use activities in the Primary Zone of the Delta are consistent with the Land Use and
Resource Management Plan adopted by the Delta Protection Commission. Coordinate
with the Delta Stewardship Council on actions impacting the Delta area.
• LU-P5.1— Plan land uses and activities in the vicinity of harbors to optimize their use for
commerce and recreation without posing a threat to Bay or Delta resources, including
water quality and shoreline and marshland habitats.
Additionally, the Conservation, Open Space, and Working Lands Element in the Draft General
Plan has policies geared towards protecting and enhancing the Sacramento-San Joaquin River
Delta and shoreline areas. Policies specific to the Delta include:21
• COS-P9.1— Advocate for increased freshwater flow into, through, and from the Delta into
San Francisco Bay, and support other efforts to protect and improve Delta water quality.
• COS-P9.2— Support continued maintenance and improvement of Delta levees to protect
water quality, ecosystems, agricultural land, and at-risk communities.
• COS-P9.3— Oppose all efforts to construct an isolated conveyance (e.g., peripheral canal,
tunnel) or any other water diversion system that reduces Delta water flows unless and
until it can be conclusively demonstrated that such a system would protect, preserve, and
enhance water quality and fisheries of the San Francisco Bay/Delta estuary system.
• COS-P9.4— Plan for land uses along shorelines that do not pose a threat to Bay or Delta
resources, including water quality and shoreline and marshland habitats.
19 Economic Sustainability Plan for the Sacramento-San Joaquin Delta, Delta Protection Commission. January 19, 2012. p.43.
20 Public Review Draft Contra Costa County 2045 General Plan - Land Use Element.
21 Public Review Draft Contra Costa County 2045 General Plan - Conservation, Open Space, and Working Lands Element.
Ch. 3 Overview Policy Consulting Associates, LLC 76
• COS-P9.5— Support efforts to expand and enhance public access to the Bay shoreline and
Delta.
• COS-P9.6— Prohibit private development on tule islands, sand dunes, and levee
remnants.
• COS-P9.7— Evaluate cumulative impacts on boating safety when reviewing applications
for new or expanded marinas and docks.
• COS-P9.8— Require design excellence for new development along Bay and Delta
waterways to enhance the visual quality of these areas.
The Delta’s demographic composition is diverse, featuring small towns and scattered rural
residences in the interior and large urban areas on the outskirts. The population density in the
inner Delta is generally very low. Most residents live in or near the peripheral urban areas. The
highest concentration of people is found in the urban centers of Sacramento to the north,
Antioch and Pittsburg to the west, and Stockton and Tracy to the southeast.
As of 2015, the Delta was home to 582,884 people. Of this population, 573,483 resided in the
Secondary Zone, while 9,401 lived in the Primary Zone. The age distribution in the Delta during
the same period indicated that 32 percent of the population was 24 years old or younger, 44
percent were between 25 and 59, and 25 percent were 60 or older.
The average unemployment rate between 2011 and 2015 was 10.9 percent in the Primary Zone
and 12.4 percent in the Secondary Zone, compared to the statewide unemployment rate of 9.9
percent during the same period. The average Median Household Income (MHI) from 2011 to
2015 was $40,347 in the Primary Zone and $60,539 in the Secondary Zone, while the statewide
MHI was $61,818.22
According to the California Department of Finance, the cities and communities in Contra Costa
County that are partially or completely within the Delta had a total population of 292,232 in
2010. By 2020, the population had increased by approximately 18 percent to 343,477. In the
22 Delta Protection Commission Socio-Economic Summary. 2019.
Ch. 3 Overview Policy Consulting Associates, LLC 77
same year, Contra Costa County's total population was 1,165,927, indicating that about 29
percent of the County's residents lived in Delta areas.23
Among these communities, the City of Antioch had the largest population at 115,291, while the
community of Byron had the smallest at 1,140 residents.
23 2020 Census, State Redistricting Data (Public Law 94-171) Summary File, U.S. Census Bureau, August 2021. Prepared by:
California Department of Finance, Demographic Research Unit, 915 L Street, Sacramento, CA.
http://www.dof.ca.gov/Forecasting/Demographics/.
Ch. 3 Overview Policy Consulting Associates, LLC 78
Figure 3-3: Contra Costa Communities located partially or completely within the Delta
Year
Percentage
Location 2010 2020 Change
City of Antioch 102,327 115,291 +13%
City of Brentwood 51,481 64,292 +25%
City of Oakley 35,432 43,357 +22%
City of Pittsburg 63,264 76,416 +21%
Bay Point CDP* 21,349 23,896 +12%
Bethel Island CDP 2,137 2,131 -0.3%
Byron CDP 1,277 1,140 -11%
Discover Bay CDP 13,352 15,358 +15%
Knightsen CDP 1,568 1,596 +2%
Total 292,232 343,477 +18%
*CDP: A "Census Designated Place" (CDP) is a statistical counterpart of incorporated places.
They are not legally incorporated. The boundaries are defined in cooperation with local officials
and generally updated prior to each decennial.
Future development and growth in the Delta are significantly affected by Senate Bill (SB) 5,
which requires cities and counties with urban and urbanizing areas in the Sacramento-San
Joaquin Valley to establish substantial evidence that certain developments and projects are
protected from a 200-year flood event, which represents a flood event that has a 0.5-percent
probability (1 in 200) of occurring in any year, before approval is granted.
The Urban Levee Design Criteria (ULDC) and the Urban Level of Flood Protection documents
developed by DWR outline the requirements for substantial evidence, which also applies to in-
fill development. According to GC §65007(i), an urban is defined as a developed area in which
there are 10,000 residents or more, while an urbanizing area is defined as a developed area or
Ch. 3 Overview Policy Consulting Associates, LLC 79
an area outside a developed area24 that is planned or anticipated to have 10,000 residents or
more within the next ten years under GC §65007(j).
Therefore, since mid-2016, Central Valley cities and counties have been prohibited from
entering into development agreements, approving discretionary permits or other discretionary
entitlement, or any ministerial permit that would result in the construction of a new residence,
a tentative map, or a parcel map for which a tentative map is not required, that would result in
construction, and approving subdivision maps in urban or urbanizing areas without a finding of
flood-level protection.
The ULDC and Urban Level of Flood Protection requirements, developed pursuant to SB 5,
impose extensive “findings” requirements on local land-use authorities. This can make
achieving the required level of protection difficult in many developed areas due to the
necessary system improvements to meet increased flood protection standards. Compliance
with these requirements will likely demand significant financial and staff resources, which are
already a challenge in many local agencies.
It should be noted that SB 5 affects only areas of anticipated new development or development
in progress. Rural and fully built-out areas generally have no immediate plans to meet the 200-
year flood protection requirements. In many rural areas, local agencies focus on maintaining
their existing levee systems.
Development in the Delta is also constrained by the California Land Conservation Act
(commonly known as the Williamson Act) program, in which Contra Costa County is a
participant. The Williamson Act aims to preserve agricultural land and related open space uses
by discouraging premature and unnecessary conversion to urban uses. In exchange for agreeing
to maintain Williamson Act compatible land uses, landowners receive the benefit of reduced
property tax rates from the County. Williamson Act contracts are voluntarily established 10-
year agreements between a landowner and the County, and the term of the contract is
automatically renewed every year unless a notice of non-renewal is filed by the landowner.
24 A developed area is an urbanized area with infrastructure capable of sustaining residential, commercial, and industrial uses
and structures.
Ch. 3 Overview Policy Consulting Associates, LLC 80
A Williamson Act contract restricts a landowner’s ability to use or subdivide any parcel of land
under an existing contract. Compatible uses under the Williamson Act generally consist of
agricultural (such as farming, ranching, grazing, and timber) and related uses such as
agriculturally related processing facilities.
Similar to Williamson Act lands, conservation easements aim to set aside lands for non-urban
uses. Conservation easements differ from Williamson Act parcels in that agricultural or
conservation easements are legal agreements between a landowner and a government or
nonprofit entity, such as a land trust, that conserve agricultural, biological habitat, or open
space resources by temporarily or permanently limiting future development.
Conservation easements typically restrict development and subdivision to the degree necessary
to protect a property's significant habitat, open space, or other conservation values. Some
conservation easements include “home sites,” or areas known as “exclusions” to the easement
terms where limited development is allowed. Generally, home sites or exclusions are small in
size (one to two acres) and located in areas low in conservation value.
A complex network of federal and state laws and regulations governs land and water use in the
Delta, including those related to water rights, water quality, endangered species management,
and land development.
Major flood management initiatives in California have historically been undertaken by local,
state, and federal agencies in an evolving cooperative relationship. Beginning in the 1850s,
levee improvements were initiated as entirely local undertakings, with sporadic efforts to
provide State coordination and oversight. Federal participation in flood management in
California was first authorized with the Caminetti Act of 1893.
The following federal, state, and local agencies specific to Contra Costa County currently play a
significant regulatory and levee management role in the Delta.
Ch. 3 Overview Policy Consulting Associates, LLC 81
• The Federal Emergency Management Agency (FEMA)— FEMA plays a multitude of flood
management roles, including managing the National Flood Insurance Program (NFIP)25,
which includes mapping and classification of flood hazards. FEMA administers the
Disaster Mitigation Act of 2000, which requires that local communities evaluate the
natural hazards within their boundaries and develop mitigation plans for those hazards in
order to maintain eligibility for its Pre-Disaster Mitigation (PDM) and Hazard Mitigation
Grant Programs. FEMA also provides federal disaster recovery assistance in the event of
federal emergency declarations or disaster declarations.
• U.S. Army Corps of Engineers (USACE)— At the federal level, USACE is primarily
responsible for planning, designing, and constructing federally authorized flood
management facilities, including dams, levees, and other structures. It also develops the
operational rules for federally funded flood control reservoirs, which include most of the
major reservoirs on Central Valley streams. Following the Hurricane Katrina Gulf Coast
disaster of 2005, the USACE implemented a National Levee Safety Program, promulgated
strict vegetation management guidelines, and strengthened its national levee inspection
program.
• California Department of Water Resources (DWR)— DWR primarily acts through the
Division of Flood Management and is responsible for State-level flood management,
including cooperating with USACE in project planning, design, and funding, cooperating
with the National Ocean and Atmospheric Administration in flood and water supply
forecasting, operating the Flood Operations Center, providing flood fight assistance, and
maintaining portions of the flood management system. DWR’s levee maintenance
responsibilities include portions of the system designated for State maintenance in the
California Water Code and operating Maintenance Areas when local agencies cannot or
choose not to meet the maintenance obligations established under the assurances given
to the CVFPB and USACE. Under these authorities, the DWR will assume responsibility for
levee maintenance.
25 The National Flood Insurance Program (NFIP) is administered primarily under the National Flood Insurance Act of 1968 (1968
Act) and the Flood Disaster Protection Act of 1973 (FDPA).
Ch. 3 Overview Policy Consulting Associates, LLC 82
• Central Valley Flood Protection Board (CVFPB)— CVFPB establishes, maintains, and
enforces standards for the construction, maintenance, and operation of the flood control
system to protect life, property, and habitat in California’s Central Valley. The Board
coordinates State entities, local flood risk control agencies and the federal government
to minimize damages from floods in California’s Central Valley and is the non-federal
sponsor for federal flood control projects in the State Plan of Flood Control. The Board
serves as a public forum for flood risk reduction policy in the Central Valley and is
responsible for adopting updates to the Central Valley Flood Protection Plan (CVFPP)
every five years.
• Contra Costa County Flood Control and Water Conservation District (CCCFWD)—
Established in 1951, the District provides regional flood protection and offers technical
information and education to both cities and residents. CCCFWD’s operations are
primarily funded by property taxes and developer fees.
• Local levee districts and reclamation districts (RDs)— Known collectively as Levee
Maintaining Agencies (LMAs), regularly patrol, maintain, repair, and conduct flood fights
as needed on the levees within their jurisdictions.
• Contra Costa County Local Agency Formation Commission (LAFCO)— Oversees the
formation, changes of organization, and dissolution of special districts, including RD’s in
Contra Costa County. The primary role of LAFCo in reviewing the services of cities and
special districts (in the case of this MSR, RD’s) is to determine the level of services
currently provided by these agencies and their long-term capability of providing services
in the future.
As discussed, SB 5 affects future development and growth in the Delta, particularly in areas
within the Sacramento-San Joaquin Valley. The burden of enforcement of the SB 5
requirements lies with the land use authorities (cities and counties), not the reclamation
districts. In Contra Costa County, only two of the 12 reclamation districts reviewed in this MSR
Ch. 3 Overview Policy Consulting Associates, LLC 83
(RD 799 and RD 2137) encompass land within the City of Oakley, while the remaining districts26
fall entirely under the County's land use authority.
To assist cities and counties in meeting SB 5 requirements, the California Department of Water
Resources (DWR) developed the Urban Level of Flood Protection criteria. These guidelines
support affected cities and counties in making the necessary findings related to flood
protection levels prior to approving certain land use entitlements in accordance with the 2007
California Flood Legislation. The Urban Level of Flood Protection does not require levee
improvements to withstand a 200-year flood. However, achieving the Urban Level of Flood
Protection can be accomplished through four mechanisms:
• That the flood management systems are in place that protect the property to the urban
level of flood protection;
• That conditions imposed by the local community on a property, development project, or
subdivision are sufficient to protect the property to the urban level of flood protection;
• That the LFMA has made “Adequate Progress” on the construction of a flood protection
system that will provide the necessary urban level of flood protection for the location of
the proposed development; or
• That property in an undetermined risk area has met the urban level of flood protection
based on substantial evidence in the record.
Municipalities subject to SB 5 had until July 2, 2015, to incorporate its requirements into their
General Plan (Government Code §65302.9) and until July 2, 2016, to adjust local zoning
regulations (GC §65860.1). Areas that had not achieved compliance with SB 5 requirements as
of July 2016 would be prohibited from permitting new development or issuing discretionary
permits that would significantly change or intensify the use of existing structures. SB 5 does not
specify any state agency for review, approval, or enforcement authority. Instead, it relies on the
due diligence of cities and counties to incorporate flood risk considerations into floodplain
26 RD 800, RD 830, RD 2024, RD 2025, RD 2026, RD 2059, RD 2065, RD 2090, RD 2117, RD 2122.
Ch. 3 Overview Policy Consulting Associates, LLC 84
management and planning in compliance with the general plan amendment and corresponding
zoning update requirements.
Once the local general plan and zoning amendments to achieve consistency with SB 5 were
completed, additional provisions related to urban flood protection became effective. These
included the requirement for land use decisions to demonstrate that the development meets
urban-level flood protection standards or FEMA’s national flood protection standards.
After July 2016, SB 5 significantly restricted urban communities' ability to approve residential
development projects unless 200-year flood protection has been provided or the community is
making adequate progress toward achieving 200-year flood protection. The City of Oakley and
Contra Costa County, as the land use authorities of the reclamation districts reviewed here,
must adhere to the General Plan and zoning amendment requirements outlined in SB 5.
The City of Oakley is currently not impacted by SB 5 requirements, as no areas within the City or
Planning Area are within the 200-year floodplain, based on DWR’s Best Available Maps (BAM)27.
BAM was developed by DWR as authorized by SB 5, which initially displayed the 100-year and
200-year floodplains for areas located within the Sacramento-San Joaquin Valley. SB 5 requires
that these maps provide the best available information on flood hazards and be provided to
cities and counties in the Sacramento-San Joaquin Valley watershed. This effort was completed
by DWR in 2008. DWR has since expanded the BAM to cover all counties in the state and to
include 500-year floodplains. Both RD 2137 and RD 799, which encompass land within the City,
are within the 100-year flood zone, representing a 1 percent chance of flooding in any given
year.
Similarly, Contra Costa County’s 2045 General Plan indicates that there are no mapped 200-
year flood zones in unincorporated Contra Costa County; however, the County highlights that
the areas within the 500-year flood zone, which represents a 0.2 percent chance of flooding in
any given year, can be used as a proxy in low-lying portions of East County (areas mainly at risk
of flooding from the Delta).28
27 City of Oakley, General Plan. Community and Health Safety Element. Adopted January 11, 2022. p. 8-4.
28 Contra Costa County, 2045 General Plan – Health and Safety Element. Adopted November 5, 2024. p. 9-14.
Ch. 3 Overview Policy Consulting Associates, LLC 85
None of the ten reclamation districts reviewed in unincorporated Contra Costa County, where
the County serves as the land use authority, fall within the 500-year flood zone. Instead, they lie
entirely within 100-year flood zones, which have a 1 percent annual chance of flooding.
Additionally, the unincorporated community of Discovery Bay, which is primarily within RD 800,
is designated as an area with reduced flood risk due to the existing levee system. There are also
planned upgrades to achieve a 200-year flood protection.
Furthermore, the County has incorporated policies in the Public Facilities and Services Element
as well as the Health and Safety Element of the General Plan outlining various actions to
achieve 200-year flood protection in appropriate areas:
• PFS-P5.1— Support public and private efforts to improve protection against flooding,
subsidence, and inundation, especially projects that achieve 200-year flood protection or
better, factoring in anticipated sea level rise in areas of the county covered by the Central
Valley Flood Protection Plan (CVFPP).
• PFS-A5.2 (c)— Coordinate with responsible parties, public and private, to develop a flood
risk management plan for the levee systems protecting the unincorporated county that
establishes a long-term plan to upgrade the system as necessary to provide at least a 100-
year level of flood protection and 200-year level of flood protection where required.
• HS-P5.1— Prohibit urban development in areas designated 100-year or 200-year (or 500-
year when used as a proxy for the 200-year) floodplain or in areas subject to increased
flood hazards due to subsidence or other changes unless appropriate mitigations to
reduce flood risk to the standards of the Flood Disaster Protection Act of 1973 or above
are implemented.
• HS-P5.4— Evaluate development within the Sacramento-San Joaquin Valley for
consistency with DWR’s Urban Level of Flood Protection Criteria. Prohibit new single-
family residences, density increases, subdivision maps, or development agreements for
any property within a 200-year floodplain in an urban or urbanizing area unless an
adequate finding can be made pursuant to California Water Code Sections 9600 to 9603.
Ch. 3 Overview Policy Consulting Associates, LLC 86
• HS-P13.1— Except for infill sites, require new development in High and Very High Fire
Hazard Severity Zones, the WUI, and 100-year or 200-year floodplains to have access to
at least two emergency evacuation routes, and encourage the same for existing
development.
While the land use authority is responsible for enforcing SB 5 requirements, some reclamation
districts assist in complying with SB 5. The potential for new growth within each municipality's
200-year floodplain determines whether further progress will be made in complying with SB 5
requirements for proposed developments.
The Urban Level of Flood Protection Criteria document requires, prior to development
approval, the presentation of substantial evidence to support a finding of “adequate progress”
on the construction of a flood protection system that will result in providing an urban level of
flood protection to an urban area. Such a finding by a local agency shall be based, at a
minimum, on the following:
1. A report prepared by the local flood management agency demonstrating adequate
progress as defined in California Government Code §65007(a).
2. A report prepared by a professional civil engineer registered in California to document
the data and analyses for demonstrating the property, development project, or
subdivision will have an urban level of flood protection at the time when the flood
protection system is completed.
3. A report by an Independent Panel of Experts on the review of the report prepared by
the Professional Civil Engineer.
4. A response by the Professional Civil Engineer to the comments from the Independent
Panel of Experts.
5. The most recent annual report prepared by the local flood management agency that
was submitted to the Central Valley Flood Protection Board documenting the efforts in
working toward completion of the flood protection system.
6. Any additional data and information that cities or counties use to make the finding.
Ch. 3 Overview Policy Consulting Associates, LLC 87
California Government Code §65007(a) defines adequate progress as all of the following:
(1) The total project scope, schedule, and cost of the completed flood protection system
have been developed to meet the appropriate standard of protection.
(2) (A) Revenues that are sufficient to fund each year of the project schedule developed in
paragraph (1) have been identified and, in any given year and consistent with that
schedule, at least 90 percent of the revenues scheduled to be received by that year have
been appropriated and are currently being expended.
(B)Notwithstanding subparagraph (A), for any year in which state funding is not
appropriated consistent with an agreement between a state agency and a local flood
management agency, the Central Valley Flood Protection Board may find that the local
flood management agency is making adequate progress in working toward the
completion of the flood protection system.
(3) Critical features of the flood protection system are under construction, and each critical
feature is progressing as indicated by the actual expenditure of the construction budget
funds.
(4) The city or county has not been responsible for a significant delay in the completion of
the system.
(5) The local flood management agency shall provide the Department of Water Resources
(DWR) and the Central Valley Flood Protection Board with the information specified in
this subdivision sufficient to determine substantial completion of the required flood
protection. The local flood management agency shall annually report to the Central
Valley Flood Protection Board on the efforts in working toward completion of the flood
protection system.
The local flood management agency's initial adequate progress report was due to DWR and the
CVFPB by July 1, 2016. Following this initial submission, annual progress reports are required to
continue demonstrating compliance with flood management requirements.
Ch. 3 Overview Policy Consulting Associates, LLC 88
The Contra Costa County Flood Control and Water Conservation District (CCCFWD) owns
property throughout the county to construct and maintain regional flood control facilities,
which include approximately 79 miles of channels, creeks, and other drainage, along with 30
detention basins and dams. Contra Costa County employs comprehensive flood management
strategies, including reservoirs with active flood control capacity, levees alongside the major
flood control channels, and drainage systems that pump interior runoff and seepage from
levee-protected areas back into the flood control channels.
Non-structural flood risk management elements include a variety of measures designed to limit
the risk of flood damage by avoiding or reducing exposure to damaging floodwaters rather than
by confining those floodwaters with larger and stronger hydraulic structures. These elements
involve raising and waterproofing structures to ensure they are above anticipated flood levels
and limiting development in floodplains through the acquisition of agricultural conservation
easements, open space easements, regulatory constraints, and incentive programs.
Restoration of floodplains, where feasible, is often regarded as a non-structural element
because it reduces, rather than increases, the confinement of floodwaters in existing channels.
Flood risk reduction programs in the region include:
• FEMA’s National Flood Insurance Program (NFIP) maps flood hazard areas nationwide
through Flood Insurance Rate Maps (FIRMs). These maps identify areas at risk of flooding
and are essential tools for floodplain management and risk mitigation. Any place with a
one percent chance or higher chance of experiencing a flood each year is considered to
have a high risk of flooding. Under NFIP guidelines, homes and other structures with
federally backed mortgages must carry flood insurance if they are in areas with significant
flood risk. Figure 3-4 illustrates the flood zone designations.
Contra Costa County, along with cities such as Antioch, Oakley, and Brentwood,
participates in the NFIP program29. Participation allows community residents to access
29 The Federal Emergency Management Agency (FEMA), Community Status Book Report. Communities Participating in the
National Flood Program.
Ch. 3 Overview Policy Consulting Associates, LLC 89
reduced flood insurance rates, provided the local permitting agencies meet specific
requirements. If a community does not participate in the NFIP, residents within that
community are not able to purchase flood insurance.
Ch. 3 Overview Policy Consulting Associates, LLC 90
Figure 3-4: FEMA Flood Zone Designation
Risk Level Zones Designation
Due to proximity to a pond, stream,
river or protective barrier under
construction. In communities that
participate in the NFIP, flood
insurance is mandatory if mortgages
High Risk A, AE, AH, AO, AR & A99 are federally backed.
Areas with an additional hazard from
storm waves. These areas have a 26%
chance of flooding over the life of a
30-year mortgage. In communities
that participate in the NFIP, flood
insurance is mandatory for federally
High Risk Coastal V & VE backed mortgages.
Represent areas with a moderate risk
of flooding. These areas may have
reduced their risk with mitigation
efforts such as levees, or experience
shallow flooding, with water usually
less than 1 foot deep or covering less
Moderate Risk B & X (Shaded) than 1 square mile.
Areas are at a lower risk of flooding,
though not entirely without risk.
Low Risk C & X (Unshaded) Flood insurance is recommended.
Area includes areas with possible
flood hazards, but because no flood
hazard analysis has been conducted
to determine probability, the flood
risk in these areas is undetermined.
Insurance rates are based on the
Undetrmined Risk D uncertainty of the flood risk.
• The Contra Costa County Floodplain Management Program focuses on unincorporated
areas and is managed by the County’s Engineering Services Division. In compliance with
the NFIP, the County has adopted a Floodplain Management Ordinance requiring that the
lowest floor of all new or substantially improved structures in Special Flood Hazard Areas
Ch. 3 Overview Policy Consulting Associates, LLC 91
(SFHAs)30 be elevated one to two feet above the 100-year Base Flood Elevation (BFE). This
elevation reduces flood risk and can lower flood insurance premiums for property
owners.
• The Flood Control Subventions Program, authorized by California Water Code Sections
12980, et seq., and managed by DWR, is designed to reimburse local agencies for eligible
costs associated with the maintenance and rehabilitation of flood control facilities, as
well as expenses related to disaster response. Under this program, the Central Valley
Flood Protection Board (CVFPB) reviews and approves DWR's funding recommendations
and enters into formal reimbursement agreements with local agencies to facilitate the
financial assistance process.
• Public Law 84-99 (PL 84-99), Emergency Response to Natural Disasters, is the basic
authority given to the Corps of Engineers to provide for emergency activities in support
of State and Local governments prior to, during, and after a flood event. The Flood Control
and Coastal Emergencies (FCCE) appropriation provides funding for PL 84-99 authorized
activities. Under PL 84-99, the Corps can provide both emergency technical and direct
assistance in response to flood and coastal storms, such as hurricanes and natural
disasters. In addition, the Corps can assist if there is a flood threat from damage caused
by earthquakes to flood risk management projects. The assistance must be requested by
the State, and it must be supplemental to State and Local actions, including resources and
capabilities.
No reclamation districts in Contra Costa County maintain project levees (discussed later
in this section); however, reclamation districts with levees that meet PL 84-99 standards
can apply to the Corps for participation in the PL 84-99 program.
According to the 2024 Delta Plan review, there are approximately 1,330 miles of project, non-
project, and other levees in the Delta and Suisun Marsh. These levees help reduce flood risk for
30 A "Special Flood Hazard Area" has a one percent or greater chance of flooding in any given year, sometimes referred to as the
one percent annual chance flood or base flood.
Ch. 3 Overview Policy Consulting Associates, LLC 92
around 740,000 acres of land in the Delta. They define the Delta's physical characteristics,
impact the reliability of its water supplies and ecosystem health, and are critical to the Delta's
residents, farms, businesses, cities, and legacy communities.
Differences in how levees are classified can influence reports about their length and condition.
Approximately 65 percent of the levees (720 miles) in the Delta are owned or maintained by
local agencies or private owners and are not part of the flood control projects on the
Sacramento or San Joaquin rivers. Most of these are non-project levees maintained by local
reclamation districts created and funded by landowners, initially for the purpose of draining
("reclaiming") Delta islands and tracts. The reclamation districts (RDs) continue to maintain
levees and other water control facilities today. These non-project levees are defined in Water
Code section 12980(e). Generally, these levees are built to an agricultural standard and are
typically less stable than project levees.
The State-federal flood control projects on the Sacramento and San Joaquin rivers include
approximately one-third, or about 380 miles, of the Delta's levees. Known as "project levees,"
they begin on the left bank of the Sacramento River at Sherman Island and line most of the
riverbanks, as well as the Sacramento River Deep Water Ship Channel and some connecting
waterways north to Sacramento and beyond. Project levees are built to higher standards that
comply with USACE guidelines and are overseen by CVFPB. CVFPB has adopted regulations to
control encroachments on the project and some of the streams that flow into it. It also
regulates encroachments within designated floodways, which are the channels of a river or
other watercourse and the adjacent land areas that convey floodwaters (California Code of
Regulations) CCR), Title 23, Division 1, Chapter 1, Article 2, Section 4).
Some levees in the Delta are neither project levees nor non-project levees. These "unattributed
levees" include hundreds of miles of levees in the Delta and are not part of any State-financed
flood control program. They also include some levees that are no longer maintained along the
Ch. 3 Overview Policy Consulting Associates, LLC 93
perimeter of permanently flooded islands and no longer serve flood control or drainage
purposes.31
Delta levees are distinguished from river levees in that they are constantly holding back water,
making them more comparable to dams. Unlike dams, however, Delta levees were not
constructed with strict engineering standards to withstand the constant pressure of water from
the daily cycle of tides, wind, and boat wakes.
31 Delta Stewardship Council, Chapter 7: Reduce Risk to People, Property, and State Interests in the Delta (as amended in 2024).
p.10.
Ch. 3 Overview Policy Consulting Associates, LLC 94
Figure 3-5: Project levees and non-project levees in the Delta
Ch. 3 Overview Policy Consulting Associates, LLC 95
Ensuring that Delta levees are properly designed, constructed, and maintained is critical to
reducing flood risk while protecting the Delta’s unique communities, ecosystem, and
infrastructure. Over the past several decades, state and federal agencies have established
guidelines and standards to define minimum criteria for levee design and maintenance.
From 1987 until 2014, levee upgrades often sought improvement to meet the FEMA Delta
Hazard Mitigation Plan (HMP) standard as an interim step toward compliance with Public Law
84-99 (PL 84-99) or the Bulletin 192-82 standards. Significant progress was made, with more
than half of Delta reclamation districts meeting HMP criteria (CALFED Bay-Delta Program 2000;
Delta Stewardship Council 2013).
Currently, no state standards establish specific design criteria for flood protection of state and
interstate highways that cross the Delta. Federal standards require interstate highways to be
protected from 50-year flood events to qualify for Federal Highway Administration funding (23
CFR 650.715). The levee investment priorities outlined in this chapter use this standard to
assess flood risks to Delta interstates and state highways, including Highways 160, 4, and 12.
However, because most roads in the Delta were constructed before these standards were
developed, they do not meet the standards.
The following levee standards and guidance are applicable to the Delta:
The Hazard Mitigation Plan (HMP) design standard was developed following the 1983 and 1986
floods as a result of negotiations among FEMA, DWR, the State of California Office of
Emergency Services (OES), and the Delta Levee Maintaining Agencies (LMAs).
The goal of the HMP is to establish a minimal, short-term, interim standard that would lessen
the likelihood of repeat damages to Delta levees and islands to ensure that FEMA disaster
assistance would not be requested repetitively for the same islands after minor floods. Initially,
FEMA used the HMP standard to determine eligibility for disaster assistance; however,
compliance with HMP does not guarantee federal aid today.
Ch. 3 Overview Policy Consulting Associates, LLC 96
The HMP standard provides only a minimal level of flood protection, making it insufficient for
agricultural areas with permanent crops and critical habitats vulnerable to flooding. The
standard was not designed as a long-term standard and is inadequate for any land use requiring
sustained flood prevention
Despite progress, full compliance with the HMP standard has not yet been achieved for all Delta
levees.
The DWR 200-year Urban Levee Protection standard goes beyond criteria for levee height and
geometric design to include requirements for freeboard, slope stability, seepage/under-
seepage, erosion, settlement, and seismic stability. It protects against a flood event with a 0.5
percent chance of occurring in any given year (a 200-year level of flood protection). This urban
levee standard is the only standard that specifically links land uses to levee criteria.
State law requires that by 2025, flood-prone urban areas with over 10,000 residents must meet
this 200-year flood protection standard. Very few levees in the Delta meet this standard
because most Delta levees do not protect urban areas. Under existing law, rural levees are not
required to meet this standard.
The FEMA 100-year protection is an "insurance" standard, often called the "1 percent annual
chance flood" level of protection, which establishes levee criteria that levees must meet to
protect against flooding that is the basis for FEMA's flood insurance rate maps (FIRM) (44 Code
of Federal Regulations 65.10). This standard is often used alongside the USACE criteria to
prescribe requirements for levee freeboard, slope stability, seepage/under seepage, erosion,
and settlement.
The FEMA 100-year standard generally does not address seismic stability. In communities
where levees provide this level of flood protection, new developments are not required to
meet federal floodproofing standards and can obtain federally guaranteed mortgages without
Ch. 3 Overview Policy Consulting Associates, LLC 97
purchasing flood insurance. Few Delta levees outside of cities meet this standard, and some
urban levees require improvement to meet it.
DWR conducted studies of levee design criteria suitable for use in the Delta and published its
results in 1983 as DWR Bulletin 192-82. Though similar to the PL84-99 standard, Bulletin 192-82
includes design precepts that enhance the USACE Delta-specific standard. Under the Bulletin
192-82 cross-section recommendations, levees are designed to withstand a water level with a
0.33 percent (1 in 300) annual chance of occurrence. This includes 1.5 feet of freeboard for
levees protecting rural areas and 3 feet of freeboard above the 300-year flood elevation for
levees protecting urban areas.
The Delta Flood Protection Act of 1988 requires that Delta Levee Subventions projects be
compatible with Bulletin 192-82 (Water Code Section 12987). Additionally, Bulletin 192-82
serves as a conceptual framework guiding long-term levee improvements (Water Code Section
12225), distinguishing it from short-term standards such as the HMP.
The PL 84-99 guideline is a minimum requirement established by USACE for levees that
participate in its Rehabilitation and Inspection Program (33 United States Code 701n) (69 Stat.
186). This standard for levee geometry outlines a minimum levee height and a slope stability
factor of safety; however, does not specify a level of protection (such as a 100-year floodplain)
or address seismic stability. Delta islands or tracts that meet the PL 84-99 criteria may be
eligible for USACE funding for levee rehabilitation, island restoration after flooding, and
emergency assistance, provided that the reclamation district is accepted into the USACE's
program and passes a rigorous initial inspection and periodic follow-up inspections.
Eligibility for PL 84-99 was formerly based primarily on levee geometry with minimum
freeboard and maximum steepness of slopes. USACE's periodic inspection program
incorporates other elements into eligibility, including the presence of structure encroachments,
vegetation, rodent control programs, and more. The PL 84-99 cross section is roughly
equivalent to that proposed in Bulletin 192-82. The CALFED Record of Decision and the DPC
Ch. 3 Overview Policy Consulting Associates, LLC 98
Economic Sustainability Plan; both has set a goal of improving Delta levees to meet the PL 84-
99 criteria; however, funding has been inadequate to attain this objective.
As with all working structures, the Delta levees are continually deteriorating and must be
regularly maintained, something that costs millions of dollars annually. In some cases, allowing
some Delta islands to flood can be helpful as a release valve for excess water. Similarly,
farmland set aside for deliberate flooding is also being explored. These flooded spaces can also
provide ecosystem benefits.
According to controversial findings from the Delta Risk Management Strategy (commonly
known as DRMS), Delta islands may flood more than 200 times in the next century, and there is
a chance of as many as 30 levees crumbling simultaneously. Such levee failure would also result
in an economic loss of $35 billion.
Experts also say there is a better than 60 percent chance that an earthquake or major flooding
in the Sacramento-San Joaquin Delta will cause multiple levees to fail simultaneously in the
next 50 years, especially in the western and central Delta. If such an event occurs, repairs would
take years, if at all, given the cost and the fact that there is only one contractor in California
currently doing such work. Widespread flooding could force a long-term shutdown of the State
Water Project and federal Central Valley Project pumps that supply much of California with
water. Delta levees also protect an extensive network of public utilities (pipelines, highways, rail
lines), preserve extensive farmland, and facilitate significant recreational opportunities.
Only about a third of the Delta levees (385 miles) are part of a federal flood management
project of the Sacramento and San Joaquin River system and, as a result, are eligible for
rehabilitation by the USACE. In contrast, the vast majority of the levees—more than 730 miles
and all of the Suisun Marsh levees—are local levees. These local levees were constructed and
maintained during the past 130 years by local RD’s. In general, the levee work has been
financed by the landowners within the levees. In the past 30 years or so, the State has provided
supplemental financing for levee maintenance and emergency response.
Ch. 3 Overview Policy Consulting Associates, LLC 99
Levee failure (such as a breach) could cause catastrophic flooding, potentially causing injury or
loss of life, damaging property and infrastructure, interrupting the water supply, and
threatening environmental resources of importance to the entire state. Though levee
maintenance and improvements over the past three decades have reduced the frequency of
levee failures, until 2024, the State had no comprehensive method to prioritize its investments
in operations, maintenance, and improvement projects for levees in the Delta and Suisun
Marsh.
Assuming Delta levees remain at current conditions (i.e., no improvement or degradation), by
2050, the following could be exposed to flooding from levee overtopping during a 100-year
event.
• 10 percent of the Delta’s existing population (including more than 42,000 residents who
live in areas with high social vulnerability),
• 33 percent of Delta land, and 148,000 acres of agriculture
This would total more than $10 billion in exposed agricultural, residential, commercial, and
infrastructure assets and nearly $2 billion in economic activity. These figures double by 2085.
To address these challenges, the Delta Levees Investment Strategy (DLIS) took effect in 2024,
fulfilling the legislative mandate for a comprehensive levee investment strategy aimed at
ensuring public resources are transparently used for improving and maintaining Delta levees.
The Delta Stewardship Council determines the priorities for levee investments, while the DWR
and CVFPB allocate the funds. Each year, the DLIS requires DWR to report to the Council on its
funding decisions for levee operations, maintenance, repairs, and improvements. If funding
decisions differs from DLIS priorities, DWR must illustrate how the projects reduce flood risks in
the Delta. This allows for tracking investments over time and adjusting priorities as risks evolve.
State funds are first directed to islands and tracts that pose the greatest risk to state interests,
which include people, property, reliable water supply, ecosystem health, and the overall
delta. Given the limited financial resources at federal, state, and local levels, the DLIS
emphasizes the efficient use of resources by identifying the most urgent risks and evaluating
Ch. 3 Overview Policy Consulting Associates, LLC 100
the benefits and trade-offs of risk reduction alternatives. It combines an analysis of the
likelihood of flooding with the consequences, such as loss of life, property damage, and
disruption of water supply, to identify the areas of the Delta with the greatest risks.
The risk analysis methodology includes evaluating the probability of levee failure due to
hydraulic flooding and seismic hazards. To estimate flood risk for Delta islands and tracts, the
Council developed a risk assessment model known as the DLIS Tool. Each island and tract in the
Delta is categorized into one of three priorities: Very High Priority, High Priority, or Other
Priority.
When risks are reduced through levee improvements or other mitigation measures on very high
and high-priority islands, other areas can rise in priority.
Flood control facilities are subjected to natural forces that can reduce their effectiveness over
time. Routine maintenance helps preserve the original design and reliability of flood control
systems and involves activities such as routine inspections, erosion control, vegetation removal,
debris and sediment removal, and control of burrowing animals. Coupled with long-term flood
risk reduction projects, routine maintenance strengthens the structural integrity of the levee
systems. Maintenance activities are typically performed by Levee Maintaining Agencies (LMAs,
including RDs, responsible for specified segments of levee systems.
Wave action and high-water events cause erosion on the waterside of levees, thereby altering
the levee geometry and reducing a levee’s overall effectiveness. RDs work to mitigate these
issues by placing a layer of rocks (rip rap) on the waterside of the levee to reduce the erosive
forces. To a lesser extent, slope grading/dragging can be done to repair minor rills in the levee
slopes.
Burrowing animals also threaten the structural integrity of levees. Burrowing rodents can
create extensive networks of tunnels throughout levee systems, creating a path for water to get
from the waterside to the landside of the levee. RDs have employed measures such as grouting,
baiting, and hunting to remove burrowing animals from their levees.
Ch. 3 Overview Policy Consulting Associates, LLC 101
Additionally, thick vegetation on levees reduces the ability to visually inspect a levee. Therefore,
RDs trim, remove trees and shrubs, and mow grass to meet guidelines established by USACE
and DWR.
DWR maintains levees and access roads through the Levee Repairs Program. DWR evaluates
levees and completes required maintenance to meet assurances provided by the federal
government. Other levee repair and maintenance tasks DWR performs include:
• Perform thorough periodic inspections and evaluations to determine levee conditions and
identify threats.
• Maintain and repair levees to sustain flood system integrity and reduce flood risk.
• Maintain the levees to protect, restore, and enhance environmental resources.
• Respond promptly and appropriately to identified levee problems.
• Support environmentally compatible improvements, which minimizes costs to operate
and maintain the flood control system.
Project levees are subject to certification and inspection by the USACE. In addition, they are
also subject to AB 156 inspection and reporting requirements. Levees are inspected up to four
times a year, including inspections by USACE. Under Assembly Bill (AB) 156, Local Maintaining
Agencies (LMAs) must report the condition of their levees to the DWR, which compiles this data
into an annual report.
AB 156 was introduced during the 2007-08 Legislative Session and was approved by the
Governor on October 10, 2007.32 Additions to the California Water Code (CWC) as a result of AB
156 include requirements that, on or before September 30 of each year, a local agency
responsible for the operation and maintenance of a project levee (or jurisdictional non-project
levee) must prepare and submit a report to DWR. This report contains specified information for
inclusion in periodic flood management reports prepared by DWR (CWC §9140). By establishing
32 Chapter 368, Statutes of 2007.
Ch. 3 Overview Policy Consulting Associates, LLC 102
these requirements, AB 156 imposes a state-mandated local program. These additions to the
Water Code became effective on July 1, 2008.
DWR is responsible for developing and administering a program to facilitate LMA reporting
requirements. LMAs are required to submit their project levee reports by September 30 of each
year. DWR consolidates this information into an Annual Report, which is then submitted to the
CVFPB by December 31 of each year. The Annual Report provides a summary of the information
collected from LMAs responsible for the operation and maintenance of the 1,600 miles of
project levees within the State-Federal flood protection system.
DWR’s inspection results are categorized into three ratings:
• Acceptable (A)— No immediate work is required beyond routine maintenance. The flood
protection project is functioning as designed and intended, with a high degree of
reliability, and necessary cyclical maintenance is being performed adequately.
• Minimally Acceptable (M)— One or more deficient conditions exist that need
improvement or correction. The project will essentially function as designed but with a
reduced level of reliability compared to its full potential.
• Unacceptable (U)— One or more significant deficiencies exist that may prevent the
project from functioning as designed or required.
Reclamation districts are special districts responsible for reclaiming and/or maintaining land
subject to frequent overflow or flooding via systems of levees, dikes, pumps, and ditches within
both urban and rural lands. Most RDs were established when local landowners first started
agricultural production many decades ago. Maintenance and improvement of Delta levees have
been the responsibility of the local RDs for the last 130 years.
The principal act that governs the districts is the Reclamation District Act. It empowers RDs to
(1)construct, maintain, and operate levees, pumping plants, canals, and other diversion and
irrigation infrastructure; (2) acquire, maintain, and operate irrigation systems (dams, diversion
works, canals, pumps) and supply irrigation water to lands within and contiguous to district
Ch. 3 Overview Policy Consulting Associates, LLC 103
bounds; (3) construct, maintain, and operate transportation (such as roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds; and (4) retain an
agricultural expert to advise landowners. Districts must apply and obtain LAFCo approval to
exercise latent powers, that is, those services authorized by the Reclamation District Act but not
provided by a district by the end of 2000.
RDs are charged with preventing flooding of the land in their jurisdiction, which requires
maintenance of levee structures and/or other facilities such as pump stations. California RDs
tend to operate under their own authority. Typically, RDs are overseen by elected board
members and the costs to maintain the levees are covered by property taxes and benefit
assessments. The financing abilities of RDs have been limited relative to needs, although some
funds have been made available by the State for the last few decades. Under emergency
situations, RDs are supported by county, state, and federal agencies but receive their
authorization to operate under their own authority through the DWR and the USACE.
There are 12 reclamation districts (RDs) in Contra Costa County, all of which are reviewed in this
MSR.
Figure 3-6: Contra Costa County Reclamation Districts by Delta Zone
Primary Delta Zones Secondary Delta Zones BOTH DELTA ZONES
RD 830
RD 2024
RD 2025 RD 799
RD 2026 RD 800 RD 2065
RD 2059 RD 2137
RD 2090
RD 2117
RD 2122
Ch. 3 Overview Policy Consulting Associates, LLC 104
4 . —
RDs are a unique type of special district. Typically, they are formed by landowners to protect
their property from flooding by maintaining the levees or natural habitat. RDs have several
unique funding mechanisms. Most are funded by a combination of property tax, special
assessments, the sale of warrants, and applicable grants. Other RDs have been more creative in
seeking funding. Some RDs, for example, receive revenues by charging owners to use the levees
as roads.
Some districts receive a portion of the property tax collected by the County. These taxes are
redistributed based on the percentage share each agency received in 197833, with an additional
increment based on the change in assessed value from the previous year.
Most of the RDs receive revenues from special assessments paid by landowners within the
districts. In most cases, these assessments are based on the benefit that each parcel receives
from the levee system. Special assessments are based on the proportion of benefit received
assessments are based on land use, the size and elevation of the parcel, and whether the parcel
contains buildings. Special assessments require a vote of the landowners. The vote is weighted
by the benefit received and the voting threshold is 50 percent plus one.
An RD often requires funds for capital improvements. These projects are often front funded by
warrants (authorized within the Water Code) drawn from local financial institutions. Board
33 On June 6, 1978, California voters approved Proposition 13, a property tax limitation initiative that altered the distribution of
property tax revenues to counties, cities, schools, and special districts that rely on property taxes as a primary source of
funding.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 105
members and/or residents provide the district with funds through the issuance of warrants. In
return, they receive improved flood protection and earn interest on the value of the warrant.
The following section outlines grant funding opportunities available through state bond
measures, the DWR, the California Department of Fish and Wildlife (CDFW), and the California-
Federal Bay-Delta Program (CALFED). State programs primarily derive funding from bond
measures approved by California voters, primarily from Proposition 84, Proposition 1E, and
Proposition 13.
In 2014, voters approved Proposition 1, which allocated $239 million for statewide and delta
levee projects. All bond funding is specified in the bond measure by function and is often
allocated regionally based on need and benefit. Most levee grant programs are administered
based on identified needs and benefits as overseen by DWR and the Central Valley Flood
Protection Board (CVFPB).
The Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection
Bond Act of 2006 (Proposition 84) authorizes $5.388 billion in general obligation bonds to fund
safe drinking water, water quality and supply, flood control, waterway and natural resource
protection, water pollution and contamination control, state and local park improvements,
public access to natural resources, and water conservation efforts.
Proposition 84 allocated a total of $787,876,055 to 13 flood control programs. Among these are
the Levees Subvention Program, the Delta Levees System Integrity Program, and the Flood
Control Subventions Program, all of which are directly related to managing flood risks in the
Sacramento-San Joaquin Delta and involve various reclamation districts in the region.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 106
The “Disaster Preparedness & Flood Protection Bond Act of 2006” (Proposition 1E) makes
funding available to improve local flood emergency response. Up to $5 million in funding is
available through this grant and requires no local match. California public agencies with primary
responsibility for flood emergency response and coordination are eligible to apply. The grant’s
geographic scope includes the legal Delta, including primary and secondary zones.
This program provides funding for projects such as preparing or updating the local flood
emergency plan, coordinating flood emergency planning and preparedness, developing
processes to effectively communicate and coordinate response to flood emergencies, collecting
and exchanging flood information, and purchasing and installing equipment for emergency
communications.
California voters passed Proposition 13, the “Safe Drinking Water, Clean Water, Watershed
Protection, and Flood Protection Act,” in March of 2000. This proposition provided funding for
nonstructural flood management projects that include wildlife habitat enhancement and/or
agricultural land preservation.
This funding was first made available for direct expenditure projects during the fiscal year of
2001- 2002, followed by a competitive solicitation for grant-funded project proposals in fiscal
year 2002- 2003. Most of these funds have been expended but the Legislature continues to
have a small amount available when identified needs occur.
In November 2014, California voters passed a $7.1 billion bond measure for state water supply
infrastructure projects, such as public water system improvements, surface and groundwater
storage, drinking water protection, water recycling and advanced water treatment technology,
water supply management and conveyance, wastewater treatment, drought relief, emergency
water supplies, and ecosystem and watershed protection and restoration. Included in the bond
measure is $395 million for flood management. Of that total, $295 million is designated to
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 107
reduce the risk of levee failure and flooding in the Delta. Guidelines for applying for the funding
are still in the development stage under the purview of the DWR and CVFPB.
Many of the districts rely on grants administered by the DWR. Most of these grants come from
three main programs: the Delta Levees Program, the Flood Control Subventions Program, and
the Flood Protection Corridor Program. There are also grant programs available from the CDFW
for some habitat restoration. Grants are available for:
• Non-structural flood damage reduction projects within flood corridors
• Acquisition of real property or easements in a floodplain
• Setting back existing flood control levees or strengthening or modifying existing levees in
conjunction with levee setbacks
• Preserving or enhancing flood-compatible agricultural use of the real property
• Preserving or enhancing wildlife values of the real property through restoration of habitat
compatible with seasonal flooding
• Repairing breaches in the flood control systems, water diversion facilities, or flood control
facilities damaged by a project developed pursuant to Chapter 5, Article 2.5 of the Safe
Drinking Water, Clean Water, Watershed Protection and Flood Protection Act of 2000
• Establishing a trust fund for up to 20 percent of the money paid for acquisition for the
purpose of generating interest to maintain the acquired lands
• Paying the costs associated with the administration of the projects
This program provides financial assistance to local agencies in the Delta as outlined in Water
Code §12200, et seq. for levee maintenance and improvements costs and to provide mitigation
and environmental enhancement associated with Delta and Suisun Marsh levee maintenance
and improvements.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 108
The Delta Levees Program has several components, each offering a variety of tools to
implement projects efficiently and achieve program goals. The two largest components are the
Special Flood Control Projects and Delta Levee Subventions. The majority of the Delta Levees
Program is used to plan and build levee maintenance, improvement, and habitat-related
projects.
These programs receive $265 million of funding from Proposition 84 and $320 million of funding
from Proposition 1E. Funding sources began awarding grants in FY 07–08.
The Delta Levees Special Flood Control Projects provides financial assistance to local levee-
maintaining agencies for the rehabilitation of levees in the Delta. The program was established
by the California Legislature under SB 34, SB 1065, and AB 360. Since the inception of the
program, more than $100 million have been provided to local agencies in the Delta for flood
control and related habitat projects. The Special Project is authorized in the California Water
Code, sections 12300 through 12314. The intent of the Legislature, as stated in the Water Code,
is to preserve the Delta as much as it exists at the present time.
The program presently focuses on flood control projects and related habitat projects for eight
western Delta islands: Bethel, Bradford, Holland, Hotchkiss, Jersey, Sherman, Twitchell, and
Webb Islands, as well as the Towns of Thornton and Walnut Grove.
The Delta Levees Maintenance Subventions Program (Subventions Program) is authorized by
the CA Water Code § 12980 through 12995. The Subventions Program has been in effect since
the passage of SB 541 (Way Bill) in 1973, which has been modified periodically by Legislation.
The CA Water Code § 12981 states the intent of the legislature as "...the physical characteristics
of the delta should be preserved essentially in their present form; and that the key to
preserving the delta's physical characteristics is the system of levees defining the waterways
and producing the adjacent islands..."
The Subventions Program is a cost-share program that provides technical and financial
assistance to local agencies in the Delta for the maintenance and rehabilitation of non-project
and eligible project levees. DWR manages the Program for the CVFPB, which reviews and
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 109
approves DWR's recommendations, adopts guidelines for the maintenance and improvement
of levees, and enters into agreements with local levee maintenance agencies to reimburse
eligible costs of levee maintenance and rehabilitation.
Levee maintenance agencies (LMAs), RDs, and other government agencies responsible for
maintaining levees in the Delta can participate in the Subventions Program. Program
participants apply for funding annually to assist with levee work that meets DWR's goals and
objectives for the Delta, which are guided by the California Water Action Plan and the Delta
Plan. The CVFPB reviews and approves DWR's funding recommendations and enters into
agreements with local agencies each year to reimburse eligible costs. The program periodically
publishes a List of Active Islands.
The CVFPB adopted a revised 2016 Maintenance Subventions Guidelines in August 2016. These
guidelines apply to Subvention funding applications beginning in 2017. Applications for 2016
and prior are guided by the 2011 Guidelines, Procedures, and Criteria. Addendum
#1 incorporates the amendments to the California Water Code that became effective on July 1,
2018, which may affect reimbursement to program participants.
The Subventions Program has been dedicated to maintaining and helping to manage the aging
levees in the Sacramento-San Joaquin Delta (Delta) for nearly 50 years, investing over $245
million in flood control and habitat projects carried out by local levee maintenance agencies in
the Delta. Since 2006, with the passage of Propositions 1E and 84, the Subventions Program has
reimbursed local levee maintenance agencies an average of $9.5 million each year. The funding
has been used to support maintenance and rehabilitation activities of over 700 miles of project
and non-project levees annually. The table below summarizes the CVFPB-approved maximum
reimbursement and the actual State reimbursement through the Subventions Program.
According to the 2023 staff report, the proposed funding for FY 23-24 is $12.75 million. Staff
received 72 applications totaling approximately $62.5 million. The eligible amount of
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 110
reimbursements is determined by priority, as defined in the 2016 Subventions Guidelines,
which outlines:34
• Priority 1— Maintenance up to $20,000 per levee mile.
• Priority 2.1— Rehabilitation up to $100,000 per levee mile.
o Category 1: CVFPB's highest priority
o Category 2: Fish and wildlife habitat protective measures and easements
o Category 3: HMP expenditures
o Category 4: Bulletin 192-82 expenses
• Priority 2.2— Rehabilitation over $100,000 per levee mile.
• Priority 2.3— Rehabilitation in excess of Bulletin 192-82 (Requires approval by CVFPB)
Of the applications, 11 were from Contra Costa County RDs, requesting $10.9 million. According
to CVFPB’s FY 23-24 funding allocation plan, over $1.8 million of the $12.75 million in available
funding has been allocated for these Contra Costa County projects.
34 Meeting of the Central Valley Flood Protection Board, Department of Water Resources Staff Report. Division of Multi benefit
Initiatives. Delta Levees Office. Delta Levees Maintenance Subventions Program. June 23, 2023.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 111
Figure 4-1: FY 23-24 Contra Costa County RDs Subventions Program Application Amounts by Priority
priority 1 priority 2
maintenance priority 2.1 priority 2.2 priority 2.3
Eligible application mAX of $20,000 category 2: Fish category 3: category 4: eligible over $100,000 Over BUL 192-
DISTIRCT levee length amount PER levee mile and Wild HMP BUL 192-82 PER levee mile 82
RD 799 8.9 $890,000 $169,100 $70,000 0 $642,00 0 0
RD 800 9.7 $2,533,000 $169,750 $23,000 0 $947,000 $1,369,000 0
RD 830 15.5 $1,162,000 $294,500 $2,000 $630,000 $220,000 0 0
RD 2024 13.9 $1,863,398 $264,100 $155,727 0 $1,234,273 $195,398 0
RD 2025 10.96 $465,000 $209,000 $6,000 0 $239,000 0 0
RD 2026 12.9 $665,000 $245,100 $101,000 0 $306,000 0 0
RD 2059 7.4 $2,273,000 $140,600 $200,000 0 $540,000 $1,385,000 0
RD 2065 5.1 $175,000 $96,900 $4,000 0 $69,000 0 0
RD 2090 7 $278,500 $133,000 0 0 $138,500 0 0
RD 2117 5.4 $381,000 $102,600 $17,500 $115,000 $140,500 0 0
RD 2137 5.2 $300,000 $98,800 $5,000 0 $191,000 0 0
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 112
The Flood Corridor Program (FCP) offers grant funding to proponents of nonstructural flood
management projects across the state that focus on enhancing wildlife habitats and/or
preserving agricultural land. By conserving agricultural areas, protecting wildlife habitats,
acquiring flood flow easements, and restoring floodplain functions, floodwaters can safely
spread over, and in some instances, move more quickly through floodplains or be detained for
later release. These initiatives can lower peak flows both upstream and downstream. Other
benefits include:
• Enhanced wetland development
• Recharged groundwater
• Enhanced wildlife habitat
• Trapped sediment
• Acquired sites that cannot be made safe from future flooding
This program was established in March 2000 when California voters approved Proposition 13,
known as the "Safe Drinking Water, Clean Water, Watershed Protection, and Flood Protection
Act." Additional funding has been provided by Proposition 84 and Proposition 1E, which were
passed in 2006.
DWR has made additional funding available for the Flood Emergency Response Projects grants.
The original amount of $5 million was increased to $10 million in early 2013, and another $5
million was added in mid-2013. $10 million in funding has been awarded for statewide projects
and Delta communications equipment, while the remaining $5 million has been recommended
for projects in the legal Delta. An additional $5 million was made available for a second round of
statewide grants in 2015.
Since 2012, DWR has provided $50 million through three flood emergency response grant
programs: Statewide Grants, Delta Grants, and Delta Emergency Communication Equipment
Grants to improve local flood emergency response and contribute to increased public safety.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 113
• Statewide Grants— California public agencies whose primary responsibility is flood
emergency response and coordination are eligible to apply for this competitive grant. The
geographic scope for these grants is statewide, outside of the legal Delta. The first round
of funding under this program was awarded in September 2013. Additional funding was
made available for a second round, which was awarded in September 2015. The third
round of funding was awarded in June 2018, and the fourth round of funding was awarded
in September 2024. The total amount awarded by the Statewide Flood Emergency
Response Grant Program to date is $20.1 million.
• Delta Grants— California public agencies in the legal Delta whose primary responsibility
is flood emergency response and coordination are eligible to apply for these grants.
The first round of Delta grants was awarded in June 2014, and the second round in
September 2017 through a solicitation process. Additional funding was made available
for Directed Funding action under the grant program’s Round 2 guidelines and was
awarded in December 2018 and December 2019. The total amount awarded by the Delta
Grants Program to date is $25 million. Two RDs in Contra Costa County, RD 799 and RD
2059, received funding from the final awards of the Delta Flood Emergency Response
Grant Program, with allocations of $305,000 and $450,000, respectively, in Round 3 of
the program.
• The Flood Emergency Response Projects— Delta Communications Equipment Grant
provided $5 million to ensure that State and local agencies have a robust regional
communication system in the Delta region for effective response to high water and flood
emergencies. Funded by Proposition 84, the grant required projects to be consistent with
CalOES' California Statewide Communication Interoperability Plan to improve
communication between emergency response agencies on a regional basis.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 114
The California State Duck Stamp (CSDS) was created by legislation in 1971 (Fish and Game Code
§3702). The stamp is required when hunting waterfowl and purchased by stamp collectors. All
funds generated by the sale of stamps are deposited in the State Duck Stamp Account. The
funds can only be used for projects approved by the Fish and Game Commission (FGC) for the
purpose of protecting, preserving, restoring, enhancing, and developing migratory waterfowl
breeding and wintering habitat, evaluating habitat projects, and conducting waterfowl resource
assessments and other waterfowl related research. These funds also may be used to reimburse
nonprofit organizations for completed habitat projects.
The goals of the CSDS are to protect, preserve, restore, enhance, and develop migratory
waterfowl breeding and wintering habitats, evaluate habitat projects, and conduct waterfowl
resource assessments and other waterfowl-related research.
The CDFW awards grants for waterfowl conservation purposes to nonprofit organizations, local
government agencies, state departments, and federal agencies. The organizations must have a
specific capacity in waterfowl habitat enhancement, restoration, creation, and or research
experience.
The CDFW administers the Wetlands Restoration for Greenhouse Gas (GHG) Reduction
Program, which restores or enhances wetlands and watershed ecosystems to provide essential
services to California's people, wildlife, and fish. Wetlands have high carbon sequestration rates
and can sequester carbon for decades.
The program is funded through the Air Resources Board’s Cap-and-Trade Program as part of its
overall greenhouse gas (GHG) reduction strategy. The program supports projects that reduce
GHGs and provide co-benefits such as enhancing fish and wildlife habitat, protecting and
improving water quality and quantity, and helping California adapt to climate change. The
program is focused on GHG emission reduction through the restoration or enhancement of
Delta and coastal wetlands and mountain meadow habitats.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 115
This grant program targets two key areas:
• Sacramento-San Joaquin Delta and Coastal Wetlands— Projects in these regions aim to
implement measurable objectives that result in GHG reductions.
• Mountain Meadow Ecosystems— These statewide projects are designed to restore
mountain meadows, thereby contributing to GHG reduction and ecosystem health.
To date, the program has supported 22 projects across Coastal Wetlands, Inland Seasonal
Wetlands, Sacramento-San Joaquin Delta Wetlands, and Mountain Meadows, with a total
investment of $39.2 million. Collectively, these efforts have restored or enhanced 7,477
acres and are estimated to have sequestered 995,950 metric tons of CO2 equivalent.
The Bureau of Reclamation administers the Bay-Delta Restoration Program, which is a
collaborative effort among 25 state and federal agencies that aim to improve California’s water
supply and the ecological health of the San Francisco Bay/Sacramento-San Joaquin Delta (Bay-
Delta).
A key element of the program is water use efficiency, which is addressed through the CALFED
Water Use Efficiency Grant Program. This program was established to accelerate the
implementation of cost-effective actions that provide state-wide benefits for water
conservation. Efficient water use and conservation are critical to addressing existing water
challenges within the Delta.
The grant program provides financial support for projects that emphasize water use efficiency
and conservation activities, with the broader goals of improving ecosystem health, enhancing
water supply reliability, and maintaining water quality. Recent funding opportunities have been
announced for fiscal years 2025 and 2026, which include a funding cap of $500,000 per award.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 116
The Endangered Species Recovery Land Acquisition (RLA) Grant Program is one of four grant
programs administered by the USFWS through the Cooperative Endangered Species
Conservation Fund (CESCF) and authorized through Section 6 of the Endangered Species Act of
1973. The RLA Grant Program is part of what is known as the Nontraditional Section 6 Program
and provides funding to States and Territories for the acquisition of threatened and endangered
species habitat in support of approved and drafted species recovery plans. The RLA Grant
Program is coordinated by the CDFW Wildlife Branch in California.
The Ecosystem Restoration Program (ERP) is a multi-agency effort aimed at improving and
increasing aquatic and terrestrial habitats and ecological function in the Delta and its
tributaries. The ERP Focus Area includes the Sacramento-San Joaquin Delta, Suisun Bay, the
Sacramento River below Shasta Dam, the San Joaquin River below the confluence with the
Merced River, and their major tributary watersheds directly connected to the Bay-Delta system
below major dams and reservoirs. Principal participants overseeing the ERP are CDFW, the
United States Fish and Wildlife Service (USFWS), and the NOAA’s National Marine Fisheries
Service (NMFS), collectively known as the ERP Implementing Agencies. The ERP implements
restoration projects through grants administered by the ERP Grants Program. The vast majority
of these projects focus on fish passage issues, species assessment, ecological processes,
environmental water quality, or habitat restoration.
The ERP uses several processes to achieve its goals and ecosystem restoration activities. ERP
uses both state and federal funding to accomplish projects and activities. In addition, ERP
coordinates and collaborates with other funding entities to accomplish restoration activities.
The primary sources of State funding for ERP projects include Proposition 204 (the Safe, Clean,
and Reliable Water Supply Act, 1996), Proposition 13, Proposition 50 (the Water Quality,
Supply, and Safe Drinking Water Projects Act, 2002), and Proposition 84.
Ch. 4 RD- Funding Opportunities Policy Consulting Associates, LLC 117
5 . RECL A MAT ION DIST RIC T 7 99
Reclamation District (RD) 799 (Hotchkiss Tract) was established in 1901 under the Special Act of
the California Legislature (Statutes 1911:342, California Water Code $50300 et seq.) to provide
services within district boundaries.
RD 799 is responsible for repairing, maintaining, and improving the levees and drainage
facilities that protect Hotchkiss Tract. The District is also responsible for flood protection of all
its jurisdictional land, including a portion that has been annexed to the City of Oakley.
Additionally, during times of high water, the District conducts flood fighting and patrols on
district levees.
The Hotchkiss Tract encompasses 571 parcels of land, which include 123 vacant parcels, 37
agricultural parcels, 357 residential parcels, and 54 commercial or other parcels. Additionally,
there are public roadways and utility easements. Several electrical transmission lines traverse
the District, including the California Oregon Transmission Project operated by the Western Area
Power Administration (WAPA), the Pacific Gas and Electric Company (PG&E) Table Mountain
Tesla line, the PG&E Vaca-Dixon-Tesla line, and natural gas lines. The total value of the assets
on district land is estimated to be approximately $104 million.35
Furthermore, the area to the west of the District’s boundary, which includes the Burroughs
Parcel, is part of the Dutch Slough Restoration Project area. The Restoration Project spans
approximately 1,178 acres—most of which lies within RD 2137’s boundaries—and is restoring
these lands to tidal marsh, tidal channels, tidal open water, managed marsh, riparian woodland,
and upland grasslands. The portion of the project involving the Burroughs parcel is currently in
the planning phase.
35 Five-Year Plan. Reclamation District 799, Hotchkiss tract. March 2022. p.7-19.
Ch. 5 RD 799 Policy Consulting Associates, LLC 118
According to the Contra Costa County Department of Conservation and Development, the
District has a population of 3,335.36 Currently, three residential projects are planned within the
physical boundaries of RD 799: the DeNova Homes development at the former Shea Homes
Summer Lake North site (which will consist of 400-600 homes), the Grand Cypress Preserve
project by ACD-TI Oakley (3,200 homes), and the Estuary Cove LLC development located north
of Sandmound Blvd (271 units). Once completed, these projects are anticipated to result in
rapid population growth within the District.
All of these development projects have been approved by the City of Oakley and Contra Costa
County, the land use authorities in the area. The District reports that construction for the
DeNova Homes project is in progress. Construction for the Grand Cypress Preserve project is
expected to begin in 2025, with an estimated build-out period of 8 to 10 years. Construction for
the Estuary Cove LLC project is also anticipated to start in a few years.37
36 Contra Costa LAFCO. Directory of Local Agencies, County Services Areas. Section 11: Reclamation Districts.
37 RD 799 Request For Information, January 2025.
Ch. 5 RD 799 Policy Consulting Associates, LLC 119
Figure 5-1: RD 799 General Information
GENERAL information
Agency RD 799 (Hotchkiss Tract)
6325 Bethel Island Rd.
Address Bethel Island, CA 94511
Special Act of California Legislature, Statutes
Principal Act 1911:342, California Water Code $50300 et seg.
Date Formed 1901
Population 3,335
Last SOI Update Novemeber 18, 2015
Maintenance and operations of levees and drainage
Services Provided facilities
5; District Manager, District Secretary, Levee
Superintendent, Assistant Levee Superintendent, and
Employees Levee Assistant
Dina Holder, District Secretary
Contact Person Email: dholder@rd799.com
Website https://rd799.com
Board
Members Length of Term Term Expiration
Walter Pierce 4-Years 2025
Jim Price 4-Years 2025
Chris Mazotti 4-Years 2027
David Senior 4-Years 2027
Matt Lipary 4-Years 2025
RD 799 covers approximately 3,100 acres or approximately 4.8 square miles. The District is
about two miles northeast of the City of Oakley and is bordered by Dutch Slough to the north,
Sand Mound Slough to the east, Rock Slough and the Contra Costa Canal to the south and west,
and Little Dutch Slough to the northwest.
Most of the District’s land lies within the jurisdictional boundaries of the City of Oakley and
extends southeast beyond the City limits, primarily within the City’s SOI. Additionally, the
Ch. 5 RD 799 Policy Consulting Associates, LLC 120
District is within the Secondary Zone of the Sacramento-San Joaquin Delta and the countywide
urban limit line (ULL).
The current SOI for RD 799 is smaller than the District’s boundaries and excludes the area to the
west of the District’s boundary, which is bordered by Jersey Island Road to the east and Little
Dutch Slough to the west.
The SOI was last reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 5 RD 799 Policy Consulting Associates, LLC 121
Figure 5-2: RD 799 Boundaries and SOI
Ch. 5 RD 799 Policy Consulting Associates, LLC 122
RD 799 is governed by an elected five-member board of trustees, each serving a four-year term.
Board members are required to complete various training, including the Brown Act, AB1234
compliance, ethics training, and sexual harassment prevention. Per Article II A of the District’s
bylaws, each board member must be a local landowner within the boundaries of RD 799.38
The Board meets on the last Thursday of each month at 6:00 p.m. at the District's office located
at 6325 Bethel Island Road, Bethel Island, CA 94511. Meeting agendas are posted on the
District’s website in compliance with the Brown Act39 (Government Code §§ 54954.2 and
54956), as amended by California AB 2257, which requires agencies to make agendas available
on their websites and in a publicly accessible physical location at least 72 hours prior to regular
meetings and at least 24 hours prior to special meetings.
The District makes available agenda packets and minutes for meetings dating back to 2022.
However, a few agendas for meetings held in 2022 and 2023 are not readily available on the
website.
The District meets the requirements outlined in state laws, including those pertaining to the
Brown Act and website transparency under SB 92940, and follows best practices to ensure easy
access to important documents such as policies, procedures, bylaws, public notices, board
member information, and contact details. Additionally, the District provides further resources,
including a public records request form, regulations for builders and developers, project
application guidelines, permit requirements, updated five-year plan, the latest budget, the FY
21-22 audit, and the District’s compensation report.
38 Resolution 2017-8. A resolution of the Board of Trustees of Reclamation District No. 799 Approving and Adopting Revised
District Bylaws. August 31, 2017.
39 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
40 Senate Bill 929 (The Special Districts Transparency Act), passed in 2018, established that beginning January 1, 2020, every
independent special district must maintain an internet website unless the governing board adopts a resolution declaring its
determination that a hardship exists that prevents the district from establishing or maintaining a website. The Act also outlines
the minimum information required to be available on the website.
Ch. 5 RD 799 Policy Consulting Associates, LLC 123
To further enhance transparency, it is recommended that the District make significant financial
reports, including the most recent audits and the State Controller’s Office Financial Transaction
Report, readily available on the website in an easily accessible location.
RD 799 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
Ch. 5 RD 799 Policy Consulting Associates, LLC 124
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.41
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the area bordered by Dutch Slough to the north, E Cypress Rd to
the south, Jersey Island RD to the west, and Sandmound Blvd to the east, within RD 799, is
considered a disadvantaged community.
41 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 5 RD 799 Policy Consulting Associates, LLC 125
The District has one type of fund (governmental), which is comprised of three major funds:
general fund, state special fund, and Shea Homes fund.
• The general fund— established to account for resources allocated to financing the
general services that the District performs. Assessments and other revenue sources used
to finance the District's fundamental operations are included in this fund. This fund
accounts for all operating costs unless a separate fund is designated for those expenses.
• The state special revenue fund— accounts for the proceeds from specific revenue sources
other than special assessments, expendable trusts, or major capital projects that are
legally restricted to expenditures for defined purposes. Typically, the resources
accounted for in this fund originate from state and federal contribution programs.
• The Shea Homes fund— established to account for proceeds from special assessments
that are legally restricted to expenditures for specific purposes, as described in the
Summer Lake Development special assessment agreement.
The District also maintains an investment account with the State’s Local Agency Investment
Fund (LAIF)42, which currently contains approximately $200,000 and is designated for use only
in an extreme emergency.
Additionally, the District receives funding from the DeNova Community Facilities District (CFD)
and maintains dedicated bank accounts for the DeNova CFD funds, which currently total
$230,000. The DeNova CFD is assessed annually and is used to fund O&M activities for the
Summer Lake North levee system.
42 Investments in LAIF are invested in accordance with the investment policy of the State Treasurer for LAIF accounts. Included
in LAIF's investment portfolio are United States Treasury and federal agency securities, International Bank for Reconstruction
and Development, federal agency floating rate debentures, time deposits, bank notes, certificates of deposit, commercial
paper, corporate floaters, and bonds, and California.
Ch. 5 RD 799 Policy Consulting Associates, LLC 126
Figure 5-3: RD 799 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Revenue FY 21-22 FY 22-23 % Change
Assessments $572,588 $582,312 2
Reimbursement Grants $79,239 $361,729 357
Subventions $50,154 $48,000 -4
Other income - $28,629 100
Interest $1,429 $9,123 538
Permits $900 $550 -39
Total Revenue $704,310 $1,030,343 46
Expenditure
Salaries, wages and benefits $188,403 $260,852 38
Engineering $106,576 $124,153 16
Legal and accounting $33,896 $115,746 241
Capital outlay $37,651 $84,686 -125
Utilities $43,440 $77,440 78
Contract services $18,351 $45,294 147
Fuel $10,784 $36,580 239
Equipment maintenance $10,832 $35,761 230
Insurance $35,568 $29,429 -17
Levee repairs and maintenance $6,365 $26,465 316
Office expense $10,372 $13,504 30
Equipment rent $500 $8,273 1555
Rent $7,350 $6,930 -6
Dues and publications $4,697 $5,082 8
Telephone $2,784 $2,934 5
Miscellaneous $2,297 $2,304 0
Total Expenditure $520,046 $875,433 68
Excess (deficiency) of Receipts Over
Disbursements $184,264 $154,910 -16
Fund Balance, Beginning of Year $1,084,934 $1,269,198 17
Fund Balance, End of Year $1,269,198 $1,424,108 12
Ch. 5 RD 799 Policy Consulting Associates, LLC 127
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 21-22, the District’s total revenue of $704,310 exceeded total expenses of $520,046 by
$184,264, or 35 percent. Similarly, in FY 22-23, the District’s total revenue of $1,030,343
exceeded total expenses of $875,433 by $154,910, or approximately 18 percent.
As shown in Figure 5-3, total revenue increased by 46 percent from $704,310 in FY 21-22 to
$1,030,343 in FY 22-23. This growth is largely due to a 357 percent increase in reimbursement
grants and a 538 percent increase in interest revenue. Similarly, total expenses increased by 68
percent during this period, from $520,046 to $875,433, primarily due to significant increases in
legal and accounting fees, contract services, fuel, equipment maintenance, and equipment rent.
The District’s fund balance at the end of FY 22-23 was $1,424,108, reflecting a 12 percent
increase from the FY 21-22 ending fund balance of $1,269,198. This ending fund balance
represents 162 percent of expenditures in FY 22-23, indicating that the District has sufficient
reserves to cover approximately one year and six months of operating costs, assuming
expenses remain relatively stable. However, this reserve level is relatively low and may not
adequately cover unexpected expenses or revenue shortfalls.
According to the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD 799
(Hotchkiss Tract) is designated as very-high priority. This designation applies to levees that
significantly reduce flood risks to human life, protect state water supplies from saltwater
intrusion, and sustain critical ecosystems or agricultural lands vital to the Delta region in areas
most at risk. Based on DLIS’s funding prioritization, islands or tracts with these designations are
given priority by DWR for levee project funding.
Ch. 5 RD 799 Policy Consulting Associates, LLC 128
Additionally, special CFD taxes will be established for the new developments in Grand Cypress
Preserves and Estuary Cove to fund the operation and maintenance of District-owned facilities
constructed as part of these developments.
RD 799 maintains approximately 8.9 miles of exterior perimeter non-project levee. Additionally,
the Summer Lake South residential subdivision, located in the southeast corner of RD 799, is
protected by approximately three miles of levee. This levee is an internal ring levee constructed
by Shea Homes. The new Summer Lake North development recently added roughly three miles
of interior levee. The District owns and maintains both levee systems and it collects special
assessments for their maintenance.
The District is also responsible for repairing, maintaining, and improving a network of ditches,
canals, and four pump stations that evacuate flood and drainage water into local waterways as
part of its drainage facilities.
Although there are no records of flooding on the Hotchkiss Tract or within RD 799, the District’s
long-term plans focus on maintaining and improving levees to reduce flood risks to homes and
developed areas. Currently, the entire District’s levee system meets the Hazard Mitigation
Program (HMP) standard.
The District has no written inspection procedures; however, trained staff perform visual levee
patrols to determine the condition of the levee and identify potential and existing issues, such
as instabilities, seepage conditions, erosion points, and adequate freeboard.43
RD 799 has an updated 2022 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
43 Five-Year Plan. Reclamation District 799, Hotchkiss tract. March 2022. p.29.
Ch. 5 RD 799 Policy Consulting Associates, LLC 129
In the 2012 Five-Year Plan, the District outlined various levee projects and potential studies to
be completed within five years. While the District was unable to complete all projects due to
insufficient funding, progress was made toward routine maintenance activities and several
levee projects.
Between 2012 and 2021, the District spent roughly $1.6 million on routine levee maintenance.
Assessment fees funded 37 percent of the cost, while grants from the Delta Levee Maintenance
Subventions Program covered 63 percent of the total cost.
The District also received funds from the Delta Levees Special Flood Control Projects and
improved a portion of its levee system to meet HMP levee standards, ensuring the entire levee
system complies with this standard. Additionally, the District has utilized funds from the Delta
Levees Maintenance Subventions Program to implement some of the minor repair projects,
including maintaining all-weather roads on the levee crown, replenishing existing rip raps, and
repairing side slopes.
According to the updated Five-Year Plan, the District aims to enhance the levee system to meet
the Bulletin 192-82 standard. Currently, only 1.78 miles, or approximately 20 percent of the
total 8.9 miles of exterior perimeter levees, meet this standard. The estimated cost for this
project is $15 million, with the Delta Levees Program, specifically the Delta Levee Maintenance
Subventions and Special Projects program, identified as the sole funding source.
The District has also recently entered into a work agreement with DWR for a multi-benefit levee
rehabilitation project, which will fund initiatives outlined in the Five-Year Plan. DWR is set to
reimburse 87 percent (approximately $515,000) of the estimated total project cost of $592,000.
The District has the updated Five-Year Plan readily available on its website.
Ch. 5 RD 799 Policy Consulting Associates, LLC 130
Figure 5-4: RD 799 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Exterior Levee Miles 8.9
Summer Lake South ~3
Summer Lake North ~3 Surface Elevation 5 to -5 feet
Percentage of Levees by Standard Levee Miles by Type
Dry Land Levee 0.0
HMP Standard 100% 1 Urban Levee ~6
PL 84-99 Standard 45% 2 Agricultural Levee 8.9
Bulletin 192-82 Standard 20% 3 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 4
Detention Basins(s) No Bridges No
Floodplain
FIRM Designation AE Base Flood Elevation 9 feet
Levee Inspection Practices
RD 799 does not have a formal written levee inspection procedure; however, levee patrols are
performed routinely by District staff.
Levee Segment Description Condition
Dutch Slough Northern District boundaries Meets HMP Standard
Rock Slough Southern District boundary Meets HMP Standard
Contra Costa Canal Southwest District boundary Meets HMP Standard
Little Dutch Slough Western District boundary Meets HMP Standard
Sand Mound Slough Eastern District boundary Meets HMP Standard
Summer Lake South Levee Interior subdivison ring levee Meets HMP Standard
Ch. 5 RD 799 Policy Consulting Associates, LLC 131
Summer Lake North Levee Interior subdivison levee Meets HMP Standard
Levee Maintenance (since prior 2015 MSR)
Maintenance Cost per Levee Mile Maintenance Cost per Levee
(FY 21-22) $715 Mile (FY 22-23) $2,973
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles maintained through
the Delta Levees program (8.9 miles).
Infrastructure Needs/Deficiencies
The planned infrastructure improvements aim to address seepage and erosion control issues
while strengthening levee standards.
1: The District’s entire levee system meets the HMP standard.
2: 4 miles of the exterior perimeter levee meet the PL 84-99 Levee Standard.
3: 1.78 percent of the exterior perimeter levee is at or above the Bulletin 192-82 Levee
Standard.
The District currently does not engage in any facility and resource-sharing practices. However,
due to the rapid development activities within the area, the District plans to establish various
cooperative facilities with the City of Oakley to facilitate this growth.
According to the updated Five-Year Plan, the levees protecting the developed areas require
improvements; however, existing encroachments severely limit the options for upgrading the
levees and performing traditional levee work. Consequently, RD 799 plans to examine the
possibility of other measures to increase flood protection in these areas, including constructing
flood walls and/or installing sheet piles.
Another challenge is seepage, which affects 30 percent of the District’s levee system. Mitigating
seepage at the toe of the levee and landside areas is an immediate priority for the District, as
significant seepage and piping can lead to levee failure. Measures to control or minimize
seepage may include constructing new open ditches or widening existing ones, installing
monitoring wells, creating new subsurface drainage systems or enhancing existing ones, and
Ch. 5 RD 799 Policy Consulting Associates, LLC 132
placing additional culverts crossing the roads. This project is estimated to cost a total of $2.7
million.
Additionally, 50 percent of the levee system requires erosion control work, estimated to cost
$4.5 million. According to the Five-Year Plan, the existing riprap protection does not sufficiently
cover the waterside slope to protect the levee from wind-generated waves, which could lead to
flooding and make the levee susceptible to failure. When implementing levee improvement
measures, the district plans to repair existing ripraps and install new protective materials as
necessary around the perimeter of the District.
Furthermore, the District will continue its routine maintenance of the levee system and conduct
any necessary repairs.
The District reports that overall service delivery is adequate; however, anticipated sea level rise
due to climate change necessitates enhancing the District’s current levee standards to ensure
improved flood protection. 44
Rapid population growth poses similar challenges, necessitating increased funding and staff.
Additionally, due to its location, the district will need to collaborate with land use authorities,
including the County and the City of Oakley, to ensure growth does not increase flood risks or
compromise existing flood control infrastructure.
The 2015 MSR recommended a governance structure option for RD 799 to establish mutual aid
agreements with nearby reclamation districts to formalize capacity and resource-sharing plans
during emergencies.
Since then, the District has entered into a mutual aid agreement with the neighboring Bethel
Island Municipal Improvement District (BIMID), effective January 19, 2017. The agreement
facilitates prompt emergency response in the event that either District is affected by or
44 RD 799 Request For Information, January 2025.
Ch. 5 RD 799 Policy Consulting Associates, LLC 133
threatened with an emergency. It enables mutual assistance with levee and drainage
maintenance and repair, as well as coordinated emergency response efforts following events
such as flooding. The agreement also includes reception services such as emergency lodging,
registration, and inquiry support for displaced individuals, forced to evacuate, or in need of
assistance due to the breakdown of normal services.45
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks to infrastructure and human life during
flood events. The District can also explore mutual aid agreements with other Contra Costa
County reclamation districts to address shared challenges in the Delta region and strengthen
community resilience. Such agreements would equip the District with additional resources to
manage flood risks that may be exacerbated by a growing population.
45 Emergency Mutual Aid Agreement entered between the Bethel Island Municipal Improvement District (BIMID) and
Reclamation District 799 (RD 799). January 19, 2017.
Ch. 5 RD 799 Policy Consulting Associates, LLC 134
5-1: According to the Contra Costa County Department of Conservation and Development,
RD 799 has a population of 3,335. Currently, three residential projects are planned
within the area that are expected to add 3800 homes and 271 units. Once completed,
these projects are anticipated to result in rapid population growth within the District.
5-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community
was identified as disadvantaged. According to the DWR Mapping Tool, the area
bordered by Dutch Slough to the north, E Cypress Rd to the south, Jersey Island RD to
the west, and Sandmound Blvd to the east, within RD 799, is considered a
disadvantaged community.
5-3: The District maintains about 8.9 miles of exterior perimeter non-project levee through
the Delta Levees Program. The District also owns and maintains approximately six
miles of interior levees built by the Summer Lake South and Summer Lake North
residential subdivisions. Maintenance funding for these levees is sourced from a
special assessment collected by RD 799.
5-4: The District is also responsible for repairing, maintaining, and improving a network of
ditches and canals, as well as four pump stations that evacuate flood and drainage
water into local waterways, as part of its drainage facilities.
5-5: All 8.9 miles of exterior levees meet the HMP Levee Standard. Currently, the District’s
desired level of protection is improving the exterior perimeter levee system to meet
the Bulletin 192-82 Levee Standard. Currently, 20 percent or 1.78 miles of the exterior
perimeter levee system is at or above the Bulletin 192-82 Levee Standard.
5-6: The updated Five-Year Plan indicates that levees protecting developed areas need
improvement; however, existing encroachments restrict upgrade options. As a result,
RD 799 is considering alternative flood protection measures, such as the construction
of flood walls or the installation of sheet piles.
Ch. 5 RD 799 Policy Consulting Associates, LLC 135
5-7: The planned infrastructure improvements, as identified in the District’s Five-Year Plan,
will focus on addressing seepage and erosion control in sections of the levee system as
funding becomes available. Additionally, the District will continue its routine
maintenance of the levee system and conduct repairs as needed.
5-8: The District reports that current service delivery is generally adequate; however, rising
climate change and rapid growth necessitate enhancing the District’s levee standards
to ensure improved flood protection, which will require increased staffing and
funding.
Additionally, collaboration among the District and the appropriate land use
authorities, including the County and the City of Oakley, is pivotal to ensure that
growth does not accelerate flood risks or compromise existing flood control
infrastructures.
5-9: RD 799 operates on revenues from property owner assessments, the Delta levees
program, and the Summer Lake Development special assessment (DeNova CFD
funds).
5-10: The District also maintains an investment account with the State’s Local Agency
Investment Fund (LAIF), which currently contains about $200,000 and is designated
solely for use in extreme emergencies.
5-11: In FY 21-22 and FY 22-23, total revenue exceeded total expenses by 35 and 17
percent, respectively. Total revenue increased from $704,310 in FY 21-22 to
$1,030,343 in FY 22-23, representing a 46 percent increase, largely due to a 357
percent increase in reimbursement grants and a 538 percent increase in interest
revenue.
Total expenses also increased by 68 percent during the same period, from $520,046
to $875,433, primarily due to significant increases in legal and accounting fees,
contract services, fuel, equipment maintenance, and equipment rent.
5-12: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
799 is designated as “vey-high priority.” This designation applies to levees that
significantly reduce flood risks to human life, protect state water supplies from
saltwater intrusion, and sustain critical ecosystems or agricultural lands vital to the
Delta region in areas most at risk. Based on DLIS’s funding prioritization, islands or
tracts with these designations are given priority by DWR for levee project funding.
5-13: Recently, the District entered into a work agreement with DWR for a Multi-Benefit
Levee Rehabilitation Project, for which DWR is set to reimburse 87 percent of the
estimated total project cost of $592,000.
Ch. 5 RD 799 Policy Consulting Associates, LLC 136
5-14: Additionally, special CFD taxes will be implemented for the new developments in
Grand Cypress Preserves and Estuary Cove, which will provide funding for the new
District owned facilities.
5-15: The District has not identified additional potential funding opportunities.
5-16: The District currently does not engage in any facility and resource-sharing practices.
However, due to the rapid development activities within the area, the District plans
to establish various cooperative facilities with the City of Oakley to facilitate this
growth.
5-17: RD 799 is governed by a five-member board of trustees, each serving staggered four-
year terms.
5-18: The District maintains a website that provides various policy, planning, and financial
documents to the public. To further enhance transparency, it is recommended that
the District make missing agendas and minutes, as well as significant financial
documents, such as the most recent audit and the State Controller’s Office Financial
Transaction Report, readily available on the website in an easily accessible location.
5-19: The 2015 MSR recommended establishing a regional mutual aid agreement with
nearby reclamation districts to formalize resource-sharing plans for flood
emergencies. Since then, the District has entered into a mutual aid agreement with
Bethel Island Municipal Improvement District ("BIMID") to facilitate prompt
emergency response. The agreement provides mutual assistance with levee and
drainage maintenance and repair, as well as reception services for displaced
individuals, those forced to evacuate, or those in need of assistance due to the
breakdown of normal services, in the event that either District is affected by or
threatened with an emergency.
The District can also further explore mutual aid agreements with other Contra Costa
County reclamation districts to address shared challenges in the Delta region and
strengthen community resilience. Developing such regional partnerships could
reduce shared expenses and improve operational efficiency across districts.
Furthermore, such agreements would equip the District with additional resources to
manage flood risks that may be exacerbated by a growing population.
Ch. 5 RD 799 Policy Consulting Associates, LLC 137
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 799.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• Of the District’s 571 parcels, land use includes 37 agricultural parcels, 357 residential
parcels, 123 vacant parcels, and 54 commercial or other parcels. The District also contains
public roadways, utility easements, and multiple electrical transmission lines.
• Additionally, the area to the west of the District’s boundary, which consists of the
Burroughs Parcel, is part of the Dutch Slough Restoration Project area. Covering
approximately 1,178 acres—most of which lies within RD 2137’s boundaries— the Project
is restoring these lands to tidal marsh, tidal channels, tidal open water, managed marsh,
riparian woodland, and upland grasslands. The portion of the project involving the
Burroughs parcel is currently in the planning phase.
• Due to the various planned developments within and adjacent to the District, rapid growth
is anticipated, which could lead to increased demand for public services.
• RD 799’s key infrastructure comprises roughly 8.9 miles of exterior perimeter non-project
levee, about six miles of internal rig levee built by the Summer Lake South and Summer
Lake North residential subdivisions, along with a network of ditches, canals, and four pump
stations.
• All 8.9 miles of exterior levees meet the HMP Levee Standard. Currently, the District’s
desired level of protection is improving the exterior perimeter levee system to meet the
Ch. 5 RD 799 Policy Consulting Associates, LLC 138
Bulletin 192-82 Levee Standard. Currently, 20 percent or 1.78 miles of the exterior
perimeter levee system is at or above the Bulletin 192-82 Levee Standard.
• The infrastructure improvements, as identified in the District’s Five-Year Plan, will focus on
addressing seepage and erosion control in sections of the levee system as funding becomes
available. Additionally, the District will continue its routine maintenance of the levee
system and conduct repairs as needed.
• The District reports that service delivery is generally adequate. However, due to climate
change and rapid growth, there is a need to enhance the District’s levee standards for
improved flood protection, which will require increased funding and staffing.
• There are various planned developments within the District that necessitate collaboration
with land use authorities, such as the City of Oakley and Contra Costa County, to ensure
the anticipated rapid growth does not accelerate flood risks or compromise existing flood
control infrastructure.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• According to the DWR Mapping Tool, the area within RD 799 that is bordered by Dutch
Slough to the north, E Cypress Rd to the south, Jersey Island RD to the west, and
Sandmound Blvd to the east is considered a disadvantaged community.
It is recommended that the Commission reaffirm the current SOI for RD 799.
Ch. 5 RD 799 Policy Consulting Associates, LLC 139
6 . RECL A MAT ION DIST RIC T 8 00 (BY RON
Reclamation District (RD) 800 (Byron Tract) was established in 1909 to provide levee and
drainage maintenance services for land owned by the West-Wilhoit Company. RD 800 operates
as an independent special district under Sections 50300 et seq of the California State Water
Code, providing services within the District’s boundaries.
RD 800 is located approximately 20 miles west of Stockton and 60 miles east of San Francisco.
The District’s boundary consists of the Byron Tract, which is bisected by State Route 4 (SR4) and
includes a majority of the unincorporated community of Discovery Bay.
The District provides flood protection, levee maintenance, drainage, and water circulation
services for approximately 7,000 acres of agricultural, urban, commercial, and industrial land.
Of this area, approximately 5,500 acres are used for agriculture, primarily growing crops such as
alfalfa and corn, while the remaining 1,500 acres are designated for various urban uses within
the community of Discovery Bay.
The Town of Discovery Bay is a water recreation-oriented development with residential units, a
marina and yacht club, an 18-hole golf course, neighborhood commercial and retail uses, parks,
an elementary school, a fire station, and a sheriff’s substation. A majority of the Town’s
community services are provided by the Town of Discovery Bay Community Services District
(DBCSD) which has a different boundary than RD 800. The portion of Discovery Bay within RD
800 is largely built out, and no significant population growth is anticipated within the next 10 to
15 years.
According to the Contra Costa County Department of Conservation and Development, RD 800
serves a population of approximately 6,900 residents.46
46 Contra Costa LAFCO. Directory of Local Agencies, County Services Areas. Section 11: Reclamation Districts.
Ch. 6 RD 800 Policy Consulting Associates, LLC 140
Figure 6-1: RD 800 General Information
GENERAL information
Agency RD 800 (Byron Tract)
1540 Discovery Bay Blvd, Suite A
Address Discovery Bay, CA 94505
Principal Act California Water Code §50300 et seq.
Date Formed 1909
Population 6,900
Last SOI Update November 18, 2015
Flood protection; levee maintenance, drainage and
Services Provided water circulation
5; District Manager, District Secretary, District
Employees Foreman, Two General Maintenance Personnel
Sonnet Rodrigues, District Manager
Contact Person Email: sonnet@rd800.org
Website www.rd800.org
Board
Members Length of Term Term Expiration
Robert Lyman, President 4-Years 2025
David Harris, Secretary 4-Years 2027
Tim Bubniak 4-Years 2025
Tom Judge 4-Years 2027
Frank Morgan 4-Years 2025
RD 800 encompasses roughly 6,933 acres or approximately 10.78 square miles. Situated
entirely within Contra Costa County, the District is bordered by Indian Slough to the north, Old
River to the east, Italian Slough to the south, and a dryland levee to the west.
RD 800 lies within the Secondary Zone of the Sacramento-San Joaquin Delta. The portion of the
District located north of SR 4 falls within the countywide urban limit line (ULL), whereas the
southern portion is outside the ULL.
Ch. 6 RD 800 Policy Consulting Associates, LLC 141
The most recent boundary change occurred on July 12, 2023, when LAFCO approved the
detachment of three parcels totaling 29 acres from RD 800. The detachment was part of the
County’s tentative map approval for the Pantages development project. The proposed
development consists of 277 detached single-family residential housing units, a Sheriff Marine
Patrol Substation, a public trail, and associated roadways, pedestrian facilities, and utility
infrastructure on an approximately 161-acre site.
The detached parcels are located south of Point of Timber Road in unincorporated Discovery
Bay within the Town of Discovery Bay Community Services District’s (DBCSD) service
boundary.47
The current SOI for RD 800 extends slightly to the west towards Kellogg Creek Rd and excludes
the southern edge by the Byron Highway. The SOI was last reaffirmed by Contra Costa LAFCO
on November 18, 2015.
47 Contra Costa Local Agency Formation Commission Executive Report. LAFCO 23-06: Detachment from Reclamation District
(RD) 800. July 12, 2023.
Ch. 6 RD 800 Policy Consulting Associates, LLC 142
Figure 6-2: RD 800 Boundaries and SOI
Ch. 6 RD 800 Policy Consulting Associates, LLC 143
The District’s governing body consists of a five-member board of trustees, elected to serve a
staggered four-year term, with votes based on landowner assessment values. The Board meets
on the first Thursday of each month at 10 a.m. at 540 Discovery Bay Blvd., Suite "A," Discovery
Bay, CA 94505. Residents can also participate in the meeting via Zoom.
Meeting agendas are posted on the District’s website in compliance with the Brown Act48
(Government Code §§ 54954.2 and 54956), as amended by California AB 2257, which requires
agencies to make agendas available on their websites and in a publicly accessible physical
location at least 72 hours prior to regular meetings and at least 24 hours prior to special
meetings. The District also maintains an archive of past meeting agendas and minutes, dating
back to 2023.
The District maintains a website in compliance with SB 92949 and follows best practices to
ensure easy access to relevant information, including contact details, levee improvement
updates, and encroachment standards. The District also makes available significant financial
reports, including the District‘s Compensation Report, Enterprise System Catalog, State
Controller’s Office Financial Transaction Report, and financial audits for FY 19-20, 20-21, 21-22,
and 22-23, on the website. To further improve transparency, it is recommended that the
District ensure that up-to-date annual budgets are easily accessible on the website.
RD 800 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
48 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
49 Senate Bill 929 (The Special Districts Transparency Act), passed in 2018, established that beginning January 1, 2020, every
independent special district must maintain an internet website unless the governing board adopts a resolution declaring its
determination that a hardship exists that prevents the district from establishing or maintaining a website. The Act also outlines
the minimum information required to be available on the website.
Ch. 6 RD 800 Policy Consulting Associates, LLC 144
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.50
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 800 is not considered a disadvantaged
community.
50 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 6 RD 800 Policy Consulting Associates, LLC 145
The District’s primary source of revenue is property taxes and assessments collected from the
property owners. The County of Contra Costa bills and collects property taxes and property
assessments on behalf of the District. Other revenue sources include state assistance through
the DWR Levee Subventions Program, reimbursements, homeowners’ property tax relief, and
interest income.
Ch. 6 RD 800 Policy Consulting Associates, LLC 146
Figure 6-3: RD 800 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Revenues FY 21-22 FY 22-23 % Change
Property Taxes $1,121,151 $1,222,026 9
Property Assessments $633,175 $633,323 0.02
State Assistance—Subventions $185,439 $156,841 -15
State Assistance—Grants $14,616 $30,524 109
Interest $8,550 $13,283 55
Homeowner’s Property Tax Relief $5,805 $5,618 -3
Total Revenue $1,968,736 $2,061,615 5
Expenditures
Payroll Expenses $467,106 $463,071 -1
Utilities $330,562 $408,809 24
Equipment Repairs and Maintenance $279,063 $672,385 141
Engineering $168,966 $123,549 -27
Employee Benefits $100,714 $102,566 2
Levee and Road Repairs and Maintenance $98,007 $102,517 5
Insurance $84,782 $98,029 16
Professional Fees $66,777 $54,449 -18
Willow Lake Maintenance $53,434 $50,182 -6
Water Circulation $31,549 $51,050 62
Rent $30,643 $27,999 -9
Office Expenses $28,139 $24,716 -12
Trust Fees $14,500 $14,750 2
Vegetation Control $12,660 $7,251 -43
Dues and Memberships $12,321 $13,795 12
Navigation $10,933 - -100
Drainage $10,868 - -100
Special Studies $9,300 $12,672 36
Telephone $4,618 $4,423 -4
Ch. 6 RD 800 Policy Consulting Associates, LLC 147
Fees $3,772 $17,434 362
Rodent Control $3,541 - -100
Communications $2,680 $3,501 31
Miscellaneous $1,760 $1,113 -37
Capital Outlay $180,953 $87,197 -52
Total Expenditures $2,007,648 $2,341,458 17
Excess (deficiency) of Revenues Over
Expenditures Prior to Other Financing
Sources (Uses) $(38,912) $(279,843) -619
Other Financing Sources (Uses)
Operating Transfers from Other Funds $150,000 $350,000 133
Operating Transfers from Other Funds $(150,00) $(350,000) (133)
Total Other Financing Sources (Uses) $0 $0 -
Net Change in Fund Balance (deficit) $(38,912) $(279,843) -619
Fund Balance, Beginning of Year $5,087,795 $5,048,883 -1
Fund Balance, End of Year $5,048,883 $4,769,040 -6
The District has one type of fund (governmental), which consists of two major funds: the
general fund and the special revenue fund. The general fund is established to account for
resources dedicated to financing the general services that the District performs. Property taxes,
property assessments, and other sources of revenue used to finance the fundamental
operations of the District are included in this fund. This fund accounts for all operating costs for
which a separate fund has not been established.
The special revenue fund accounts for the proceeds from specific revenue sources other than
special assessments, expendable trusts, or major capital projects that are legally restricted to
expenditures for defined purposes. Typically, the resources accounted for in this fund originate
from state and federal contribution programs.
Ch. 6 RD 800 Policy Consulting Associates, LLC 148
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 21-22, the District’s total expenses of $2,007,648 exceeded total revenue (excluding other
financing sources) of $1,968,736 by $38,912 or 2 percent. Similarly, in FY 22-23, the District’s
total expenses of $2,341,458 exceeded total revenue (excluding other financing sources) of
$2,061,615 by $279,843, or approximately 13 percent.
As shown in Figure 6-3, total revenue increased slightly by 5 percent from $1,968,736 in FY 21-
22 to $2,061,615. Similarly, total expenses increased by 17 percent during this period, from
$2,007,648 to $2,341,458, primarily due to higher costs in equipment repairs and maintenance,
utilities, and water circulation.
The District’s fund balance at the end of FY 22-23 was $4,769,040, reflecting a 6 percent
decrease from the FY 21-22 ending fund balance of $5,048,883. This ending fund balance
represents 203 percent of expenditures in FY 22-23, indicating that the District has sufficient
reserves to cover approximately two years of operating costs, assuming expenses remain
relatively stable.
According to the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD 800
(Byron Tract) is designated as very-high priority. This designation applies to levees that
significantly reduce flood risks to human life, protect state water supplies from saltwater
intrusion, and sustain critical ecosystems or agricultural lands vital to the Delta region in areas
most at risk. Based on DLIS’s funding prioritization, islands or tracts with these designations are
given priority by DWR for levee project funding.
Ch. 6 RD 800 Policy Consulting Associates, LLC 149
The District maintains approximately 19 miles of non-project levees consisting of 9.2 miles of
riverine levee surrounding the District, 3.3 miles of interior dryland levee, and another 6.4 miles
of levee along the lakes and lagoons of Discovery Bay. Other key infrastructure includes an
internal drainage system and two pump stations.
The last recorded levee breach or flooding event in the District occurred in 1907, when the
levees failed following a high-water event, resulting in inundation. Since then, there have been
no known records of levee breaches or flooding events.
In the last decade, the District has completed several levee improvement projects, including
stabilizing a slope failure site with sheet piles, supplementing existing riprap, and performing
erosion repairs at various locations. The District also conducts various routine maintenance
activities, including erosion repairs, all-weather road repairs, debris removal, minor core
trenching, vegetation control, rodent control, ditch cleaning, and pump repair and
maintenance.
District staff inspect the levees daily, with more thorough inspections conducted annually via
boat. The District Engineer also performs inspections as needed, with increased frequency
during high-water or severe weather events.
Currently, the District’s 18.9 miles of levees meet or exceed the PL 84-99 levee standard. The
levees provide 100-year flood protection51 and are accredited by FEMA. FEMA accreditation
indicate the levee system meets the design, data, and documentation requirements of 44 CFR
65.10, thereby reducing the base flood hazard. This determination is based on submittals
compliant with 44 CFR 65.10, certified by a registered professional engineer.52
Additionally, of the total 9.7 miles of urban and dry levees, 100 percent meet the HMP levee
standard, while 97 percent meet the Bulletin 192-82 levee standard.
51 This indicates that the District’s levees are designed to withstand a flood event with a 1 percent chance of occurring in any
given year.
52 FEMA Fact Sheet (How-To Guide for Floodplain Managers and Engineers). Meeting the Criteria for Accrediting Levee
Systems on Flood Insurance Rate Maps. May 2021.
Ch. 6 RD 800 Policy Consulting Associates, LLC 150
RD 800 has an updated 2023 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
The previous 2009 Five-Year Plan recommended conducting 200-Year Urban Levee Design
Criteria (ULDC) analyses to identify necessary construction projects for levee compliance.
However, the District has since decided not to pursue these analyses due to the high cost of the
likely required construction.
Currently, the district’s desired level of protection involves ongoing improvements to the levee
system to maintain the current 100-year level of protection and FEMA accreditation, while also
addressing any specific geotechnical seepage and stability issues that may be required.
Planned projects include providing supplementary rock slope protection on the waterside slope
of the levee to safeguard both the existing levee section and the improved levee after
completion. The rock slope protection project is estimated to cost $253,000.
Additionally, the District also plans to address stability and seepage concerns at three specific
locations along Old River, where seepage has historically been an issue during high water
events. This project aims to improve these sections to meet the Bulletin 192-82 levee standard
and is estimated to cost $14,005,000.
The plan assumes that funding will be available through the Delta Levees Maintenance
Subventions Program and Special Flood Control Projects. The District has participated in the
Subventions Program for over 30 years; however, it has not completed any projects with
funding through the Special Projects Program.
It is recommended that the District make the updated Five-Year Plan available on its website to
further enhance transparency.
Ch. 6 RD 800 Policy Consulting Associates, LLC 151
Figure 6-4: RD 800 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 18.9 Surface Elevation -4 to -13 ft
Percentage of Levees by Standard Levee Miles by Type
Dry Land Levee 3.3
HMP Standard 51% 1 Urban Levee 6.4
PL 84-99 Standard 100% 2 Agricultural Levee 9.2
Bulletin 192-82 Standard 48% 3 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 2
Detention Basins(s) No Bridges No
Floodplain
FIRM Designation X Base Flood Elevation 13 ft
Levee Inspection Practices
The District’s levees are inspected daily by District staff, with more thorough boat-access
inspections conducted at least annually. The District Engineer also performs inspections as
needed, with increased frequency during high-water or severe-weather events.
Levee Segment Description Condition
West boundary of District Meets HMP and PL84-99
Dry Land Levee south of Highway 4 Standard
Within Discovery Bay Meets HMP and PL84-99
Urban Levee community Standard
Indian Slough, Old River
Agricultural Levee and Italian Slough Meets the PL84-99 Standard
Levee Maintenance
Maintenance Cost per Levee Mile Maintenance Cost per Levee
(FY 21-22) $5,185 Mile (FY 22-23) $5,426
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles.
Infrastructure Needs/Deficiencies
Ch. 6 RD 800 Policy Consulting Associates, LLC 152
The District has not identified any immediate infrastructure needs; however, planned
improvements to the levee system aim to maintain current 100-year flood protection and
FEMA accreditation, while also addressing any specific geotechnical seepage and/or stability
issues.
1: 9.7 miles of the District’s levee system, which includes the dry and urban levees, meet or
exceed the HMP levee standard.
2: The entire levee system system is at or above PL 84-99 levee standard.
3: Of the District's total 9.7 miles of dry and urban levees, 9.42 miles meet or exceed the
Bulletin 192-82 levee standard.
RD 800 contracts for legal, engineering, and accounting services.
The District does not participate in any significant facility-sharing programs and has not
identified any potential collaborative opportunities.
The District has not identified any significant infrastructure needs.
The District has not identified any significant challenges in service delivery.
The 2015 MSR also recommended establishing a regional mutual aid agreement with nearby
reclamation districts to formalize capacity and resource-sharing plans during flood
emergencies. However, this recommendation has not yet been implemented.
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks during flood events. It is recommended
Ch. 6 RD 800 Policy Consulting Associates, LLC 153
that the District explore this option to address shared challenges in the Delta region and
strengthen community resilience.
Ch. 6 RD 800 Policy Consulting Associates, LLC 154
6-1: According to the Contra Costa County Department of Conservation and Development,
RD 800 serves a population of approximately 6,900 residents.
The District is primarily agricultural, while urban designated areas within the
community of Discovery Bay are largely built out; therefore, no significant population
growth is anticipated within the next 10 to 15 years.
6-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097; hence, the calculated threshold of $67,277 defines whether a community is
identified as disadvantaged. According to the DWR Mapping Tool, the entirety of the
RD 800 area is not considered a disadvantaged community.
6-3: The District provides flood protection, levee maintenance, drainage, and water
circulation services.
6-4: The District conducts various routine maintenance activities, including erosion repairs,
all-weather road repairs, debris removal, minor core trenching, vegetation control,
rodent control, ditch cleaning, and pump repair and maintenance.
6-5: The District maintains approximately 19 miles of non-project levees consisting of 9.2
miles of riverine levee surrounding the District, 3.3 miles of interior dryland levee, and
another 6.4 miles of levee along the lakes and lagoons of Discovery Bay. Other key
infrastructure includes an internal drainage system and two pump stations.
6-6: The District’s entire levee system meet or exceed PL 84-99 standards and provide
FEMA-accredited 100-year flood protection. Additionally, all 9.7 miles of urban and
dry levees meet the HMP standard, with 97 percent also meeting the Bulletin 192-82
standard.
6-7: According to the 2023 Five-Year Plan, the District’s desired level of protection involves
ongoing improvements to the levee system to maintain the current 100-year level of
Ch. 6 RD 800 Policy Consulting Associates, LLC 155
protection and FEMA accreditation, while also addressing any specific geotechnical
seepage and stability issues that may be required.
6-8: Planned projects include providing supplementary rock slope protection to strengthen
the waterside levee, estimated to cost $253,000, and a stability project to address
seepage concerns at three specific locations along Old River, estimated at
$14,005,000, to improve these sections to meet the Bulletin 192-82 levee standard.
The plan assumes that funding will be available through the Delta Levees Maintenance
Subventions Program and Special Flood Control Projects.
6-9: The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
6-10: RD 800’s primary revenue sources are property taxes and assessments. Additional
funding sources include state assistance through DWR Levee Subventions Program,
reimbursements, homeowners’ property tax relief, and interest income.
6-11: In FY 21-22 total expenses slightly exceeded total revenue (excluding other financing
sources) by two percent, while in FY 22-23 expenses exceeded revenue by 17 percent.
During this period, total revenue increased from $1,968,736 in FY 21-22 to $2,061,615
in FY 22-23, representing a five percent increase. Similarly, total expenses increased
by 17 percent, from $2,007,648 to $2,341,458, primarily due to higher costs for
equipment repairs and maintenance, utilities, and water circulation.
6-12: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
800 is designated as “vey-high priority.” This designation applies to levees that
significantly reduce flood risks to human life, protect state water supplies from
saltwater intrusion, and sustain critical ecosystems or agricultural lands vital to the
Delta region in areas most at risk. Based on DLIS’s funding prioritization, islands or
tracts with these designations are given priority by DWR for levee project funding.
6-13: The District has not identified additional potential funding opportunities.
6-14: RD 800 does not participate in any significant facility-sharing programs and has not
identified any potential collaborative opportunities.
Ch. 6 RD 800 Policy Consulting Associates, LLC 156
6-15: RD 800 is governed by a five-member board of trustees, each serving staggered four-
year terms.
6-16: The District maintains a website that offers various information including contact
details, an archive of agenda packets and minutes for meetings held since 2023, as
well as key financial reports such as financial audits for FY 19-20, 20-21, 21-22, and
22-23, the District’s Compensation Report and the State Controller’s Office Financial
Transaction Report, and Enterprise System Catalog.
To further enhance transparency, it is recommended that the District ensure that an
up-to-date Five-Year Plan and annual budgets are easily accessible on the website.
6-17: The 2015 MSR recommended establishing a regional mutual aid agreement with
nearby reclamation districts to formalize resource-sharing plans for emergencies.
However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges
in the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency across
districts.
Ch. 6 RD 800 Policy Consulting Associates, LLC 157
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 800.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• The District covers approximately 7,000 acres of agricultural, urban, commercial, and
industrial land. Roughly 5,500 acres are used for agriculture, primarily growing crops such
as alfalfa and corn, while the remaining 1,500 acres are designated for various urban uses
within the community of Discovery Bay.
• There are no anticipated changes in land use in the foreseeable future.
• The District anticipates no significant population growth or development in the near
future, indicating that demand for public services will remain stable.
• The District maintains approximately 19 miles of non-project levees consisting of 9.2 miles
of riverine levee surrounding the District, 3.3 miles of interior dryland levee, and another
6.4 miles of levee along the lakes and lagoons of Discovery Bay. Other key infrastructure
includes an internal drainage system and two pump stations.
• The District’s entire levee system meet or exceed PL 84-99 standards and provide FEMA-
accredited 100-year flood protection. Additionally, all 9.7 miles of urban and dry levees
meet the HMP standard, with 97 percent also meeting the Bulletin 192-82 standard.
• According to the 2023 Five-Year Plan, the District’s desired level of protection involves
ongoing improvements to the levee system to maintain the current 100-year level of
protection and FEMA accreditation, while also addressing any specific geotechnical
seepage and stability issues, as needed.
Ch. 6 RD 800 Policy Consulting Associates, LLC 158
• The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
• There are no communities of interest within RD 800.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 800 sphere of influence.
It is recommended that the Commission adopt an amended SOI for RD 800, which reflects the
2023 detachments of the parcels related to the Pulte Group development project, as approved
in LAFCO Resolution 23-06.
Ch. 6 RD 800 Policy Consulting Associates, LLC 159
7 . RECL A MAT ION DIST RIC T 8 30 (J ERS EY
Reclamation District (RD) 830 (Jersey Island) is an independent special district in Jersey Island,
established in March 1911 under the Reclamation District Law of 1868. RD 830 operates under
the Special Act of the California Legislature, Statutes 1911:342, and California Water Code
$50000 et seq., to provide services within its boundaries.
Jersey Island is owned by a single landowner: Ironhouse Sanitary District (ISD). The District is
situated northeast of the City of Oakley, west of Bethel Island, and six miles east of the City of
Antioch in the western Sacramento-San Joaquin Delta.
RD 830, which is surrounded by levees on all sides, protects Jersey Island from flooding. The
District also holds post-1914 appropriative water right License 1310, which authorizes the
diversion and use of surface water on Jersey Island between March 1 and November 1.
Since purchasing the island, ISD has primarily utilized the land for disposing of recycled water.
However, beginning in 2017, ISD transitioned to discharging effluent water into the San Joaquin
River from the north end of the island. Current land use within the District includes agriculture,
cattle grazing, and habitat preservation. ISD also leases the grazing and farming grounds to an
external operation. Additionally, from May to September, ISD applies biosolids to a small
portion of the farmland. 53
Currently, the District has a population of three. There is no anticipated population growth or
development within the District.
53 RD 830 Request for Information, February 2025.
Ch. 7 RD 830 Policy Consulting Associates, LLC 160
Figure 7-1: RD 830 General Information
GENERAL information
Agency RD 830 (Jersey Island)
450 Walnut Meadows Drive,
Address Oakley, CA 94561
Special Act of California Legislature, Statutes
Principal Act 1911:342, California Water Code §50000 et seq.
Date Formed 1911
Population 3
Last SOI Update Novemeber 18, 2015
Services Provided Maintenance of levees and related drainage facilities
Employees 0
Tyson Zimmerman, Treasurer
Contact Person Email: Zimmerman@isd.us.com
https://www.ironhousesanitarydistrict.com/211/RD-
Website 830
Board
Members Length of Term Term Expiration
Jean-Marc Petit, Chair 4-Years 2027
Domenic Cianfichi, Secretary 4-Years 2027
Tyson Zimmerman, Treasurer 4-Years 2025
RD 830 covers approximately 3,561 acres or approximately 5.56 square miles. The District is
entirely within Contra Costa County and the Primary Zone of the Sacramento-San Joaquin Delta,
outside the countywide urban limit line (ULL).
The current SOI for RD 830 was adopted by LAFCO in 1984 and is coterminous with the District
boundaries. The SOI was last reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 7 RD 830 Policy Consulting Associates, LLC 161
Figure 7-2: RD 830 Boundaries and SOI
Ch. 7 RD 830 Policy Consulting Associates, LLC 162
The District’s governing body consists of a three-member board of trustees that serve four-year
terms. All board members are employees of ISD, the sole landowner on Jersey Island. Pursuant
to Government Code Section 1780, vacancies on the Board of Trustees can be filled by
appointment from either the remaining Trustees or the County Board of Supervisors.
The Board meets on an “as-needed” basis at 450 Walnut Meadows Drive, Oakley, CA 94561.
Residents can also participate in the meeting via Zoom. Meeting agendas are posted on the
ISD’s website in compliance with the Brown Act54 (Government Code §§ 54954.2 and 54956), as
amended by California AB 2257, which requires agencies to make agendas available on their
websites and in a publicly accessible physical location at least 72 hours prior to regular
meetings and at least 24 hours prior to special meetings. Additionally, an archive of past
meeting agendas and video recordings is also available on the ISD’s website. Furthermore,
meeting minutes are accessible for some previous meetings; it is recommended that the
District make all past meeting minutes available online to enhance transparency.
Although RD 830 does not have a separate website, the ISD’s website has a page offering
background information about the District, contact details for the trustees, and general
information on levees.
It is recommended that additional District materials are added to the website to ensure
compliance with the requirements outlined in State laws regarding website materials per SB
92955 and best practices for easy access to relevant documents, including bylaws and planning
documents, as well as financial reports, such as annual budgets, financial audits, Compensation
Report, and the State Controller’s Office Financial Transaction Report.
54 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
55 Senate Bill 929 (The Special Districts Transparency Act), passed in 2018, established that beginning January 1, 2020, every
independent special district must maintain an internet website unless the governing board adopts a resolution declaring its
determination that a hardship exists that prevents the district from establishing or maintaining a website. The Act also outlines
the minimum information required to be available on the website.
Ch. 7 RD 830 Policy Consulting Associates, LLC 163
In contrast, RD 830 can establish a separate website to illustrate a clear separation of the
District’s functions and operations from the ISD and enhance transparency.
RD 830 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.56
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
56 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 7 RD 830 Policy Consulting Associates, LLC 164
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 830 is not considered a disadvantaged
community.
The District levies an annual Operation and Maintenance assessment on Ironhouse and
easement holders to fund maintenance of the levee system. Additionally, the District receives
state assistance from the DWR to reimburse maintenance costs and fund levee rehabilitation
projects.57
57 2024 Hazard Mitigation Plan, Contra Costa County, California. Reclamation District No. 830 (Jersey Island) Annex. p.2.
Ch. 7 RD 830 Policy Consulting Associates, LLC 165
Figure 7-3: RD 830 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Operating Revenues FY 21-22 FY 22-23 % Change
Assessments $547,314 $547,314 0
DWR Special Projects $15,197 $7,804 -49
DWR Subventions Program $165,968 $128,512 -23
Other Special Projects - $244,026 100
Other Income $1,425 $600 -58
Total Operating Revenues $729,904 $928,256 27
Operating Expenses
Levee Maintenance and Repairs $184,289 $198,183 8
Other Special Projects - $244,026 100
Expended Equipment and Repairs - $83 100
Professional Fees $24,289 $24,023 -1
Fuel $1,580 $775 -51
Insurance $14,090 $14,121 0.2
Utilities $15,058 $102,978 584
Depreciation Expense $92,586 $114,430 24
Other Operating Expenses $3,323 $5,253 58
Total Operating Expenses $335,215 $703,872 110
Net Operating Revenues (Expenses) $394,689 $224,384 -43
Non-operating Revenues (Expenses)
Interest Income $1,026 $38,413
3644
Total Non-operating Revenues (Expenses) $1,026 $38,413
Increase (Decrease) in Net Position $395,715 $262,797 -34
Net Position, Beginning of Year $4,421,968 $4,817,683 9
Net Position, End of Year $4,817,683 $5,080,480 5
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
Ch. 7 RD 830 Policy Consulting Associates, LLC 166
In FY 21-22, the District’s total operating revenue (excluding non-operating revenue)
was $729,904, exceeding total operating expenses of $335,215 by $394,689, or
approximately 117 percent. Similarly, in FY 22-23, total operating revenue increased
to $928,256, surpassing total operating expenses of $703,872 by $224,384, or about 31
percent.
As shown in Figure 7-3, although revenue from the DWR special projects, DWR subvention
program, and other income sources declined from FY 21-22 to FY 22-23, total operating
revenue still increased by 27 percent from $729,904 to $928,256. This rise was primarily due to
an additional $244,026 in income from other special projects.
During the same period, total operating expenses increased by 110 percent from $335,215 to
$703,872. The most significant change occurred in utility expenses, which rose
from $15,058 in FY 21-22 to $102,978 in FY 22-23, representing a 584 percent increase.
Additionally, in FY 22-23, expenses related to other special projects, as well as equipment and
repair costs, reflected new expenditures that were not present in the previous fiscal year.
The District’s net position at the end of FY 22-23 was $5,080,480, reflecting a five percent
increase from the FY 21-22’s net position of $4,817,683. The District’s FY 22-23 net position
represents 684 percent of operating expenses in the same period, indicating that the District
has sufficient reserves to cover approximately six years and ten months of operating costs,
assuming expenses remain stable.
It is important to note that while increases and decreases in net position (the amount by which
an organization’s total assets exceed its total liabilities) are useful indicators of whether the
District’s financial position is improving or deteriorating, it is not a direct measure of
immediately available resources. Unlike fund balances, net position may include capital assets
such as infrastructure and long-term liabilities, which are not immediately available.
Additionally, according to the Delta Stewardship Council’s Delta Levee Investment Strategy
(DLIS), RD 830 (Jersey Island) is designated as very-high priority. This designation applies to
Ch. 7 RD 830 Policy Consulting Associates, LLC 167
levees that significantly reduce flood risks to human life, protect state water supplies from
saltwater intrusion, and sustain critical ecosystems or agricultural lands vital to the Delta region
in areas most at risk. Based on DLIS’s funding prioritization, islands or tracts with these
designations are given priority by DWR for levee project funding.
RD 830’s levee system consists of approximately 15.5 miles of non-project levee in the Delta
primary zone, including 3.4 miles along the left bank of the San Joaquin River, 1.3 miles along
False River, 0.7 miles along Piper Slough, 4.9 miles along Taylor Slough, and 5.2 miles along
Dutch Slough.
In addition to the levees, the District maintains an internal drainage system, a pump station,
and three discharge pipes that were recently replaced and elevated to address subsidence
issues.
Since 1909, there have been no recorded breaches or flooding incidents on Jersey Island.
However, isolated incidents of overtopping have occurred, the latest being on December 3,
1983, when record-high tides and 60 mph wind-driven waves overtopped the north levee in the
Jersey Island headquarters area. The District repaired any damage caused by this overtopping
as part of its maintenance activities.
Since the 2015 MSR, the District has undertaken several infrastructure upgrades, including
constructing a new pump station, the rehabilitation of levees at various locations, and the
addition of a splash berm along the north levee. The District also reports that the pump and
discharge system is currently functioning at acceptable levels, with no incidents of inundation
occurring since the 2015 MSR.
Currently, the District's entire levee system meets or exceeds the HMP levee standard.
Ch. 7 RD 830 Policy Consulting Associates, LLC 168
RD 830 has an updated 2023 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
In 2009, RD 830 developed a Five-Year Plan that outlined five phases of construction projects,
each targeting specific sections of the levee to achieve a sustainable HMP levee standard for
the entire system. Since then, the District has completed the first two phases and has partially
completed the third. The completed work included levee rehabilitation, encroachment removal,
and the addition of splash berms in designated areas for enhanced protection. The remaining
projects were not completed primarily due to a lack of funding. 58
The completed rehabilitation projects raised and widened the levee to sustainably meet HMP
for an extended period of time. However, areas that were not rehabilitated have very little
overbuild above the HMP minimum elevation criteria.
The 2023 Five-Year Plan outlines the District’s long-term goal of sustainably meeting or
exceeding the Bulletin 192-82 levee standard. Currently, about 5.2 miles (34 percent) of the
entire levee system meets this standard. As the District implements the projects to meet the
Bulletin 192-82 standard, it is anticipated that the levees will also meet the PL 84 99 levee
standard.
The proposed rehabilitation plan consists of six construction phases and a splash berm project
on the south levee along Dutch Slough. The first five phases will involve full rehabilitation of the
levee, while the final phase will focus on portions that require minimal rehabilitation.59
According to the District’s Five-Year Plan, the estimated cost for engineering, planning, and
construction is $20 million. The plan assumes that funding will be available through the Delta
Levees Special Flood Control Projects, based on the DWR’s historical 100 percent cost-sharing.
The District has participated in both the Special Projects and Subventions Programs since 2000.
58 Reclamation District No. 830, Jersey Island. 2023 Five-Year Plan. February 14, 2023. p.7.
59 Reclamation District No. 830, Jersey Island. 2023 Five-Year Plan. February 14, 2023. p.5-10.
Ch. 7 RD 830 Policy Consulting Associates, LLC 169
Ch. 7 RD 830 Policy Consulting Associates, LLC 170
Figure 7-4: RD 830 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 15.5 Surface Elevation -4 to -18 feet
Miles of Levees Levee Miles by Type
Dry Land Levee 0.0
HMP Standard 15.5 1 Urban Levee 0.0
PL 84-99 Standard N/A 2 Agricultural Levee 15.5
Bulletin 192-82 Standard 5.2 3 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 1
Detention Basins(s) No Bridges No
Floodplain
FIRM Designation AE Base Flood Elevation 9.4 feet
Levee Inspection Practices
Informal levee inspections are conducted by ISD employees and keep written inspection logs.
During severe weather events, levee inspections are performed daily.
Levee Segment Description Condition
Dutch Slough Along southern District boundary Meets HMP Standard
San Joaquin / False River Along northern District boundary Meets HMP Standard
Piper Slough/ Taylor Slough Along eastern District boundary Meets HMP standard
Levee Maintenance
Maintenance Cost per Levee Mile Maintenance Cost per Levee
(FY 21-22) $11,889 Mile (FY 22-23) $12,786
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles.
Infrastructure Needs/Deficiencies
Ch. 7 RD 830 Policy Consulting Associates, LLC 171
Some levee sections are near the minimum HMP criteria for width and elevation, necessitating
ongoing monitoring and maintenance. Currently, the District has not identified any other
infrastructure needs.
1: 100 percent of the District’s levee system is at or above the HMP levee standard.
2: There is no data readily available to determine what portion of the District’s levee system
meets the PL 84-99 levee standard.
3: 34 percent of the District’s levee system meets the Bulletin 192-82 levee standard. This is the
District’s desired level of protection.
The District contracts for levee maintenance, flood control, drainage, upkeep of levee access
roads, weed abatement, slope protection, vector and rodent control, levee control, and flood
protection.
The District also negotiated with external vendors to obtain free clean fill material, which is
used to continuously enhance its levee toe-mass placement. 60
The District engages in various resource-sharing activities, including relying on ISD for personnel
and equipment related to levee maintenance and reclamation efforts. The District receives
reimbursement of up to 75 percent of the costs for the ISD labor and equipment from the DWR
through the State’s Delta Levees Subventions Program.
The District has not identified any additional resource-sharing options.
As previously mentioned, several sections of the levee are near the minimum HMP criteria for
width and elevation. These sections span approximately 8,417 feet. According to the 2023 Five-
Year Plan, the District will continue to monitor these areas to ensure they remain above the
minimum HMP geometry criteria. Maintenance activities, such as adding material to the levee
60 RD 830 Request for Information, February 2025.
Ch. 7 RD 830 Policy Consulting Associates, LLC 172
crown, will occur as necessary to maintain the minimum elevation as the underlying foundation
material settles.61
Additionally, the District addressed seepage at two levee stations near high-voltage
transmission towers operated by PG&E and WAPA in the fall of 2020. The system is currently
functioning as intended and will continue to be monitored on an ongoing basis.
No additional infrastructure needs have been identified.
The District has not identified any significant challenges in service delivery.
The 2015 MSR recommended establishing a regional mutual aid agreement with nearby
reclamation districts to formalize resource-sharing plans for flood emergencies. However, this
recommendation has not yet been implemented.
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks during flood events. For example, RD 830
has various equipment and materials, including 1,000 tons of rip-rock, sandbags, a small dump
truck, and a D-6 bulldozer, which could assist neighboring districts. It is recommended that the
District develops such regional partnerships to address shared challenges in the Delta region
and strengthen community resilience.
61 Reclamation District No. 830, Jersey Island. 2023 Five-Year Plan. February 14, 2023. p.17-18.
Ch. 7 RD 830 Policy Consulting Associates, LLC 173
7-1: RD 830 has three residents and anticipates no population growth or development in the
near future.
7-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community
was identified as disadvantaged. According to the DWR Mapping Tool, the entirety of
the RD 830 area is not considered a disadvantaged community.
7-3: The District maintains about 15.5 miles of non-project levee that surrounds the District,
one pump station, and an internal drainage system.
7-4: The District contracts for a range of services including levee maintenance, flood control,
drainage, upkeep of levee access roads, weed abatement, slope protection, vector and
rodent control, levee control, and flood protection.
The District also negotiated with external vendors to obtain free clean fill material,
which is used to enhance its levee toe-mass placement.
7-5: The entire District levee system meets or exceeds the HMP Levee Standard. Currently,
the District aims to rehabilitate the levee system to meet the Bulletin 192-82 Levee
Standard. Currently, 34 percent, or approximately 5.2 miles, of the District's levee
system is at or above the Bulletin 192-82 Levee Standard.
7-6: The proposed rehabilitation plan to achieve the Bulletin 192-82 Levee Standard consists
of a splash berm project on the south levee along Dutch Slough and six construction
phases involving full and minimal rehabilitation. This project is estimated to cost $20
million and is anticipated to be funded through DWR’s Delta Levees Special Flood
Control Projects.
7-7: The 2023 Five-Year Plan indicates that some levee sections are near the minimum HMP
criteria for width and elevation, necessitating ongoing monitoring and maintenance.
Ch. 7 RD 830 Policy Consulting Associates, LLC 174
7-8: The District reports that current service delivery is generally adequate, with no
significant challenges.
7-9: The District receives funding from an Operation and Maintenance assessment levied on
ISD and easement holders. Additionally, the District receives grants through the DWR
State Delta Levee Subvention and Special Levee Project Programs.
7-10: In FY 21-22, the District’s total operating revenue (excluding non-operating revenue)
was $729,904, exceeding total operating expenses of $335,215 by $394,689, or
approximately 117 percent. Similarly, in FY 22-23, total operating revenue increased
to $928,256, surpassing total operating expenses of $703,872 by $224,384, or about 31
percent. From FY 21-22 to FY 22-23, total operating revenue still increased by 27
percent.
During the same period, total operating expenses increased by 110 percent, with the
most significant change occurring in utility expenses, which rose from $15,058 in FY 21-
22 to $102,978 in FY 22-23, representing a 584 percent increase. Additionally, in FY 22-
23, expenses related to other special projects, as well as equipment and repair costs,
reflected new expenditures that were not present in the previous fiscal year.
7-11: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD 830
is designated as “vey-high priority.” This designation applies to levees that significantly
reduce flood risks to human life, protect state water supplies from saltwater intrusion,
and sustain critical ecosystems or agricultural lands vital to the Delta region in areas
most at risk. Based on DLIS’s funding prioritization, islands or tracts with these
designations are given priority by DWR for levee project funding.
7-12: The District has not identified additional potential funding opportunities.
7-13: The District participates in resource-sharing efforts including relying on ISD for
personnel and equipment related to levee maintenance and reclamation efforts.
7-14: The District has not identified any additional resource-sharing opportunities.
7-15: RD 830’s governing body consists of a three-member board of trustees that serve four-
year terms. All board members are employees of Ironhouse Sanitary District (ISD), the
sole landowner on Jersey Island.
Ch. 7 RD 830 Policy Consulting Associates, LLC 175
7-16: The ISD’s website provides agenda packets, minutes, and archive recordings of RD 830’s
board meetings. Additionally, there is a page dedicated to the District’s brief history
and contact information for the board of trustees.
To further improve transparency, it is recommended that the District ensure that other
relevant documents, including bylaws and planning documents, as well as financial
reports, such as annual budgets, financial audits, Compensation Report, and the State
Controller’s Office Financial Transaction Report, are added to the RD 830 page on the
ISD website.
Alternatively, RD 830 can establish a separate website dedicated to the District’s
operations to illustrate a clear separation of the District’s functions from the ISD and
enhance transparency.
7-17: The 2015 MSR recommended establishing a regional mutual aid agreement with nearby
reclamation districts to formalize resource-sharing plans for flood emergencies.
However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges in
the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency across
districts.
Ch. 7 RD 830 Policy Consulting Associates, LLC 176
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 830.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• Current land use within the District includes agriculture, cattle grazing, and habitat
preservation. ISD also leases the grazing and farming grounds to an external operation.
• There are no anticipated changes in land use in the foreseeable future.
• The District has three residents and anticipates no population growth or development in
the near future, indicating that demand for public services will remain stable.
• RD 830’s key infrastructure includes approximately 15.5 miles of non-project levees that
surround the District, one pump station, and an internal drainage system.
• The entire District levee system meets or exceeds the HMP Levee Standard. Currently, the
District aims for rehabilitation of the levee system to meet the Bulletin 192-82 Levee
Standard. Currently, 34 percent or 5.2 miles of the District levee system is at or above the
Bulletin 192-82 Levee Standard.
• The updated 2023 Five-Year Plan indicates that some levee sections are near the minimum
HMP criteria for width and elevation, necessitating ongoing monitoring and maintenance.
• The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
Ch. 7 RD 830 Policy Consulting Associates, LLC 177
• There are no communities of interest within and adjacent to RD 830.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 830 sphere of influence.
It is recommended that the Commission reaffirm the current SOI for RD 830.
Ch. 7 RD 830 Policy Consulting Associates, LLC 178
8 . RECL A MAT ION DIST RIC T 2 02 4
Reclamation District (RD) 2024 (Orwood/Palm Tracts) was established as an independent
special district on April 15, 1918. The District consisted of the Orwood Tract and was formed to
provide drainage, irrigation, and comprehensive reclamation of lands within its boundaries. In
1995, RD 2036 (Palm Tract) was dissolved, and the area was annexed to RD 2024. The original
three-member Board of Trustees for each District was expanded to the current five-member
Board serving both tracts.
RD 2024 operates under Section 50000 of the California State Water Code to provide services
within the District boundaries. RD 2024 is responsible for maintaining the levees and drainage
systems in the Palm Orwood Tract, which protect agricultural, urban, and commercial land. The
District also maintains a floodgate utilized by farmers for irrigation.
According to the Contra Costa County Department of Conservation and Development, the
District has 18 landowners.62 The total population, including seasonal residents such as farm
workers and boat residents at Cruiser Haven, is estimated to be around 40. The District
anticipates no population growth or development in the foreseeable future.
The predominant land use (approximately 95 percent of the District territory) within both tracts
is agriculture, primarily growing wheat, corn, safflower, almonds, and grapes. Portions of each
tract are also dedicated for wildlife habitat and waterfowl conservation. Additionally, there are
limited residential uses, including four single-family homes and ancillary farmworker and
caretaker housing.
The Orwood and Palm tracts are critical infrastructure islands that protect many statewide
interests. The East Bay Municipal Utility District (EBMUD) aqueducts, which deliver water to 1.3
million municipal and industrial water users throughout portions of Contra Costa County and
62 Contra Costa LAFCO. Directory of Local Agencies, County Services Areas. Section 11: Reclamation Districts.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 179
Alameda County in the East Bay region of the San Francisco Bay Area, are safeguarded by the
RD 2024 levee. Additionally, RD 2024 protects the Burlington Northern Santa Fe Railroad
(BNSF), the Kinder Morgan fuel transmission line, Pacific Gas and Electric (PG&E) gas
transmission lines 57 A, B, and C, as well as the Western Area Power Administration (WAPA)
electrical transmission facilities.63
Figure 8-1: RD 2024 General Information
GENERAL information
Agency RD 2024 (Orwood/Palm Tract)
235 East Weber Avenue
Stockton CA 95202
Address PO Box 1461
Principal Act California Water Code §50000 et seq.
Date Formed 1918, consolidated with RD 2036 in 1995
Population 40, including seasonal residents
Last SOI Update Novemeber 18, 2015
Maintenance and operations of levees, flood control,
Services Provided drainage, and one floodgate
1; A General Manager/ Secretary/ Counsel. The District
Employees also hires seasonal employees as needed.
Dante John Nomellini, Sr., General Manager
Contact Person Email: ngmplcs@pacbell.net
Website https://reclamationdistrict.wixsite.com/rd2024
Board
Members Length of Term Term Expiration
Richard Sellers 4-Years 2027
Frank Savage 4-Years 2025
Don Wagenet 4-Years 2025
John Jackson 4-Years 2027
Vacant - -
63 Five Year Plan, Reclamation District 2024, Palm Orwood Tract. March 2023 Revision 1. p.3.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 180
RD 2024 covers approximately 6,574 acres in size (4,800 of which is land area) or approximately
10.27 square miles. RD 2024 is located entirely within Contra Costa County, within the Primary
Zone of the Sacramento-San Joaquin Delta, and outside the countywide Urban Limit Line (ULL).
Access to the District is available via Orwood Road from Bixler Road and SR 4 from the south, or
through Bixler Road and Chestnut Street in Brentwood from the west. Orwood Road runs along
the northern side of Orwood Tract to the west, ending at Old River. Private levee roads provide
perimeter access around each tract, while private agricultural service roads offer access to the
interior of the tracts.
The current SOI for RD 2024 is coterminous with the District’s boundaries. The SOI was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 181
Figure 8-2: RD 2024 Boundaries and SOI
Ch. 8 RD 2024 Policy Consulting Associates, LLC 182
RD 2024 is governed by a five-member board of trustees elected at large by landowners for
four-year terms. The number of votes is determined by the annual assessment paid by each
landowner. Board members must be landowners or legal representatives of landowners within
the District. Board members serve on a volunteer basis and do not receive compensation.
Currently, one of the board member positions is vacant.
Pursuant to Government Code Section 1780, vacancies on the Board of Trustees can be filled by
appointment from either the remaining Trustees or the County Board of Supervisors. In election
years, a Notice Calling for Nomination Petitions is published. If no more than one petition per
open position is received, the County Board of Supervisors will appoint the nominated party or
parties. If no nominations are received, the County Board of Supervisors will usually appoint a
qualified person recommended by the Board of Trustees. RD 2024 reports that, due to liability
and regulatory concerns, there is a lack of enthusiasm among landowners to serve on the
board.
The board meets as needed, typically holding approximately four meetings each year. Meetings
are held in the District Secretary's conference room at 235 East Weber Avenue, Stockton, CA
95202. The District also offers residents to participate in meetings via conference call. Meeting
agendas are posted on the District’s website in compliance with the Brown Act64 (Government
Code §§ 54954.2 and 54956), as amended by California AB 2257, which requires agencies to
make agendas available on their websites and in a publicly accessible physical location at least
72 hours prior to regular meetings and at least 24 hours prior to special meetings. An archive of
agenda packets for meetings dating back to 2021, as well as minutes for meetings held from
2021-2023, is available on the District’s website.
64 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 183
Since the 2015 MSR, the District has established a website in compliance with SB 92965 that
provides access to various documents, including the most recent budget, the District’s
Compensation Report, and the State Controller’s Office Financial Transaction Report. The
District also makes the FY 21-22 audit available on the website. To further enhance
transparency, it is recommended that the District make up-to-date audits, agenda packets, and
minutes from meetings held in 2024 available on the website.
RD 2024 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
LAFCO is required to evaluate disadvantaged unincorporated communities as part of this
service review, including the location and characteristics of any such communities. The intent
and history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.66
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
65 Senate Bill 929 (The Special Districts Transparency Act), passed in 2018, established that beginning January 1, 2020, every
independent special district must maintain an internet website unless the governing board adopts a resolution declaring its
determination that a hardship exists that prevents the district from establishing or maintaining a website. The Act also outlines
the minimum information required to be available on the website.
66 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 184
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 2024 is not considered a disadvantaged
community.
The District receives funding from various sources, including property assessments levied at the
discretion of the Board of Trustees, the State Delta Levee Subvention and Special Levee Project
Programs, and financial assistance from the East Bay Municipal Utility District (EBMUD), whose
aqueduct facilities cross the District property. Additionally, EBMUD, Kinder Morgan, PG&E, and
BNSF are included on the District’s assessment roll.
The District reports that EBMUD has previously provided funding beyond its assessment, which,
in addition to state special project funding, contributed to the completion of levee
improvement work.
Excess funds on hand are deposited with the Contra County Treasurer. Currently, the District
has approximately $110,000 in funds for future project share needs. Additionally, at the end of
FY 22-23, the District reported $737,813 in Unrestricted Assets, which are not subject to
external restrictions on their use or function.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 185
Figure 8-3: RD 2024 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Receipts FY 21-22 FY 22-23 % Change
Property Assessments $320,226 $315,118 2
State Assistance $59,054 $22,057 -63
Miscellaneous $2,056 $361 -82
Total Receipts $381,336 $337,536 -11
Disbursements
Utilities $90,557 $147,096 62
Insurance $42,004 $46,509 11
Vegetation and Rodent Control $29,197 $46,341 59
Professional Fees $28,024 $14,087 -50
Levee Repairs and Maintenance $27,401 $17,720 -35
Engineering $16,303 $78,296 380
Payroll Expenses $13,348 $21,185 59
Pump Repairs and Maintenance $9,199 $107,527 1069
Drainage Maintenance $8,209 $460 -94
Contract Services $6,000 $6,000 0
Licenses and Permits $1,603 $1,879 17
Dues and Subscriptions $886 $913 3
Miscellaneous - $135 100
Total Disbursements $272,731 $488,145 79
Excess (deficiency) of Receipts Over
Disbursements Prior to Other Financing
Sources (Uses) $108,605 $(150,609) -238
Other Financing Source (Uses)
Operating Transfers from Other Funds $27,201 -
Operating Transfers to Other Funds $(27,201) -
Total Other Financing Sources (Uses) - -
Excess (deficiency) of Receipts and Other
Financing Sources Over Disbursements and
Other Financing Sources (Uses) $108,605 $(150,609) -238
Fund Balance, Beginning of Year $925,492 $1,034,097 12
Fund Balance, End of Year $1,034,097 $883,488 -15
Ch. 8 RD 2024 Policy Consulting Associates, LLC 186
The District has one type of fund (governmental), which consists of two major funds: the
general fund and the special revenue fund. The general fund is established to account for
resources allocated to financing the general services that the District performs. Property
assessments and other revenue sources used to finance the District's fundamental operations
are included in this fund. This fund accounts for all operating costs unless a separate fund is
designated for those expenses.
The special revenue fund accounts for the proceeds from specific revenue sources other than
special assessments, expendable trusts, or major capital projects that are legally restricted to
expenditures for defined purposes. Typically, the resources accounted for in this fund originate
from state and federal contribution programs.
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 21-22, the District’s total revenue (excluding other financing sources) of $381,336
exceeded total expenses of $272,731 by $108,605, or 39 percent. In contrast, in FY 22-23, the
District’s total expenses of $488,145 exceeded total revenue (excluding other financing sources)
of $337,536 by $150,609, or approximately 44 percent.
As shown in Figure 8-3, this change is due to an 11 percent decrease in total revenue from FY
21-22 to FY 22-23, primarily driven by a 63 percent decline in state assistance which fell from
$59,054 to $22,057.
In contrast, total expenses increased by 79 percent, with the most significant increase occurring
in pump repairs and maintenance expenses, which increased from $9,199 in FY 21-22 to
$107,527 in FY 22-23. Engineering expenses reflected the second-highest increase, rising from
$16,303 in FY 21-22 to $78,296 in FY 22-23.
The District’s fund balance at the end of FY 22-23 was $883,488, reflecting a 15 percent
decrease from the FY 21-22 ending fund balance of $1,034,097. Despite the decline, the FY 22-
Ch. 8 RD 2024 Policy Consulting Associates, LLC 187
23 ending fund balance represents 181 percent of expenditures, indicating that the District has
sufficient reserves to cover approximately one year and ten months of operating costs,
assuming expenses remain stable.
The District is in a strategic location within the Delta and levee system, with significant utility
and government facilities situated within its territory. As previously noted, significant utility
facilities, such as EBMUD aqueducts, the Kinder Morgan pipeline, PG&E gas and electric lines,
WAPA electric lines, and the BNSF railroad, cross the District property. The ongoing
involvement of these entities, along with interest from state and federal agencies, has
prioritized the enhancement and maintenance of RD 2024 levees.
Additionally, according to the Delta Stewardship Council’s Delta Levee Investment Strategy
(DLIS), RD 2024 (Palm-Orwood) is designated as high priority. This designation applies to levees
that significantly reduce flood risks to human life, protect state water supplies from saltwater
intrusion, and sustain critical ecosystems or agricultural lands vital to the Delta region.
Based on this funding prioritization, RD 2024 may be eligible for future levee improvement
grants as funds become available. Funding availability will depend on the progress of projects
designated at even higher priority levels or as very high priority.
The District maintains about 14.3 miles (6.5 mi Orwood and 7.8 mi Palm) of non-project levee
along the Werner Cut, Rock Slough, Old River, and Indian Slough. The District’s key
infrastructure also includes internal drainage channels, two pump stations, and one floodgate.
Levees are constructed out of earthen materials, with rock rip rap on the waterside. The Indian
Slough Segment on Orwood Tract has been extensively rocked on the waterside to eliminate
water damage from speedboats entering and leaving the Discovery Bay development area.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 188
RD 2024 protects many assets vital to the local economy, such as agriculture, public roads, and
a marina. The District’s levee protects land situated between -12 and -16 feet below sea level,
continuously holding back the river and sloughs.
In the event of a levee breach, the entire island will fill with water until the levee is repaired.
There have been no recent levee breaches; however, past incidents, including a major 1980
Palm Tract breach that threatened the EBMUD aqueducts, required significant repairs.
Additionally, stress cracks in 1992 and minor erosion in 2006 and 2011 were immediately
addressed with emergency measures.
RD 2024 has an updated 2023 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
The 2012 plan outlined three phases, which were partially completed with funding from the
DWR. Significant progress was made in levee slope improvements, seepage/stability berms, and
habitat enhancement, with most objectives being met through funding from the Delta Levees
program.
The updated five-year plan discusses the District's Adopted Template (DAT), which builds on
existing standards such as HMP, DWR Bulletin 192-82, and PL 84-99, to provide enhanced flood
protection and flood fighting capabilities, as well as promote the long-term stability and
resilience of the levee system. The District’s desired level of protection incorporates the DAT
and additional maintenance work, including rip rap installation and slope repairs, performed to
enhance stability, prevent seepage, and address areas of concern.
Additionally, supplemental multi-benefit projects have been identified to widen levees along
the Freshwater Corridors of the Middle and Old Rivers enhance flood protection, develop
shaded riverine habitats, and stockpile emergency materials.67
67 Five Year Plan, Reclamation District 2024, Palm Orwood Tract. March 2023 Revision 1. p.1-17.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 189
Funding for these projects is anticipated to come from cost-sharing support provided by various
partners, including DWR through programs such as the Subventions Program, EBMUD, and
other potential beneficiaries as available.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 190
Figure 8-4: RD 2024 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 14.3 Surface Elevation -12 to -16 feet
Miles of Levees Levee Miles by Type
District Standard (DAT) N/A 1 Dry Land Levee 0.0
HMP Standard 14.3 2 Urban Levee 0.0
PL 84-99 Standard ~14.1 3 Agricultural Levee 14.3
Bulletin 192-82 Standard ~14.1 4 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 2
Detention Basins(s) No Bridges No
Floodplain
8 feet (Orwood);
FIRM Designation AE Base Flood Elevation 7 feet (Palm)
Levee Inspection Practices
RD 2024 does not have a formal levee inspection procedure. Instead, the District Trustees and
landowners regularly monitor the levees and conduct continuous inspections during rain, wind,
and high-tide events. Additionally, the District Engineer performs periodic inspections.
Levee Segment Description Condition
Meets HMP and PL 84-99
Palm Tract Werner Dredger Cut Segment Standard
Meets HMP and PL 84-99
Palm Tract Old River Segment Standard
Meets HMP standard while some
sections fall below the PL 84-99
Orwood Tract Old River Segment Standard
Meets HMP and PL 84-99
Orwood Tract Indian Slough Segment Standard
Meets HMP standard while some
Werner Dredger Cut Extension sections fall below the PL 84-99
Orwood Tract Segment Standard
Levee Maintenance
Ch. 8 RD 2024 Policy Consulting Associates, LLC 191
Maintenance Cost per Levee Maintenance Cost per
Mile (FY 21-22) $1,916 Levee Mile (FY 22-23) $1,239
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles.
Infrastructure Needs/Deficiencies
The District has not identified any immediate infrastructure needs; however, planned
infrastructure improvements aim to enhance levee standards, ensure ongoing routine
maintenance of the levees, and improve emergency preparedness to safeguard critical
infrastructure.
1: There is no data readily available to determine what portion of the District’s levee system
meets the DAT.
2: Currently, 100 perecnt of both Palm and Orwood tract meet the HMP standard.
3: 100 percent of Palm Tract levee system is at or above PL 84-99 levee standard. 875 feet of
Orwood Tract levee is not at PL 84-99 standard.
4: 100 percent of Palm Tract levee and 97 percent of Orwood Tract levee system at or above
Bulletin 192-82 levee standard.
The District provides essential services such as levee maintenance, flood control, drainage,
upkeep of levee access roads, weed management, slope protection, vector and rodent control,
levee patrol, and flood fighting, both directly and through contracts.
The District also contracts for legal counsel and engineering support.
RD 2024 stores its flood-fighting materials container at EBMUD's Bixler Maintenance Yard. The
District reports limited opportunities for further facility sharing and has not identified any
additional options for resource-sharing.
The District has not identified any significant infrastructure needs.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 192
The District reports that overall service delivery is adequate; however, more stringent and
increasing regulations are expected to raise expenses. Furthermore, the District notes that two
landowners are delinquent in paying their assessments.
The 2015 MSR recommended establishing a regional mutual aid agreement with nearby
reclamation districts to formalize capacity and resource-sharing plans during flood
emergencies. However, this recommendation has not yet been implemented.
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks during flood events. It is recommended
that the District explore this option to address shared challenges in the Delta region and
strengthen community resilience.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 193
8-1: RD 2024 has an estimated population of about 40, including seasonal residents such as
farm workers and boat residents at Cruiser Haven. The District does not anticipate any
population growth or development in the foreseeable future.
8-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community
was identified as disadvantaged. According to the DWR Mapping Tool, the entirety of
the RD 2024 area is not considered a disadvantaged community.
8-3: RD 2024 is responsible for maintaining the levees and drainage systems of the Palm
Orwood Tract, which protect agricultural, urban, and commercial land. The District also
maintains a floodgate used by farmers for irrigation.
8-4: The District provides essential services, including levee maintenance, flood control,
drainage, upkeep of levee access roads, weed management, slope protection, vector
and rodent control, levee patrol, and flood fighting, both directly and through contracts.
The District also contracts for legal counsel and engineering support.
8-5: The District maintains about 14.3 miles (6.5 mi Orwood and 7.8 mi Palm) of non-project
levee along the Werner Cut, Rock Slough, Old River, and Indian Slough. The District has
key infrastructure, including internal drainage channels, two pump stations, and one
floodgate.
8-6: The Orwood and Palm tracts serve as vital infrastructure islands that protect essential
statewide resources, including the EBMUD aqueducts, the BNSF Railroad, the Kinder
Morgan fuel transmission line, PG&E gas lines, and WAPA electrical facilities, all
safeguarded by the RD 2024 levee. The District also protects agriculture, public roads,
and a marina.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 194
8-7: The District’s levee system for both the Palm and Orwood tracts has been significantly
improved. A total of 7.92 miles were raised to meet the minimum Hazard Mitigation
Plan (HMP) Standard, achieving 100 percent compliance for Palm Tract and 97 percent
for Orwood Tract.
The entire levee system in the Palm Tract also meets or exceeds the PL 84-99 or Bulletin
192-82 Levee Standard. While less than a mile of the Orwood Tract levee system still
does not meet the PL 84-99 or Bulletin 192-82 Levee Standard.
8-8: In addition to existing levee standards, RD 2024 has a District Adopted Template (DAT)
for levee construction and maintenance that aims to provide a higher level of
protection, enhance flood-fighting capabilities, and ensure the long-term stability and
resilience of the levee system.
Furthermore, the District’s desired level of protection includes the DAT and additional
components addressing stability, seepage, and areas of concern. Funding for the
projects identified is anticipated to come from cost-sharing support provided by various
partners, including DWR through programs such as the Subventions Program, EBMUD,
and other potential beneficiaries as available.
8-9: The District has not identified any significant infrastructure needs.
8-10: The District reports that overall service delivery is adequate; however, more stringent
and increasing regulations are expected to raise expenses. Additionally, the District
notes that two landowners are delinquent in paying their assessments.
8-11: The District receives funding from various sources, including property assessments, the
State Delta Levee Subvention and Special Levee Project Programs, and financial
assistance from EBMUD.
8-12: Any excess funds are held with the Contra Costa County Treasurer. The District reports
that approximately $110,000 is currently set aside for future project needs.
Additionally, at the end of FY 2022-23, the District had $737,813 in unrestricted assets.
8-13: The District’s FY 21-22 total revenue of $381,336 exceeded total expenses of $272,731
by 39.82 percent. In FY 22-23, however, total expenses increase to $488,145, exceeding
the total revenue of $337,536 by approximately 44.65 percent. This change was driven
by an 11 percent decrease in revenue, primarily due to a 63 percent reduction in state
assistance, while total expenses increased by 79 percent, particularly due to pump
repairs and maintenance as well as engineering costs.
8-14: Major utility facilities cross the District’s property, and the continued engagement of
these entities, along with interest from state and federal agencies, has made the
Ch. 8 RD 2024 Policy Consulting Associates, LLC 195
improvement and maintenance of the RD 2024 levees a high priority. Under the Delta
Stewardship Council’s Delta Levee Investment Strategy (DLIS), the District is positioned
for future funding, potentially qualifying for levee improvement grants as they become
available, depending upon the progress of projects with even higher priority levels.
8-15: RD 2024 stores flood-fighting materials at EBMUD’s Bixler Maintenance Yard. The
District reports limited opportunities for further facility sharing and has not identified
any additional options for resource-sharing.
8-16: RD 2024 is governed by a five-member board elected by landowners for four-year
terms. Currently, one position on the board is vacant. Due to concerns about liability
and regulations, there is limited interest in filling the role.
8-17: Since the 2015 MSR, RD 2024 has launched a website that provides various documents,
including the most recent budget, the District’s Compensation Report, and the State
Controller’s Office Financial Transaction Report. To further improve transparency, it is
recommended that the District ensure that an up-to-date Five-Year Plan, audits,
agenda packets, and meeting minutes are easily accessible on the website.
8-18: The 2015 MSR also recommended establishing a regional mutual aid agreement with
nearby reclamation districts to formalize resource-sharing plans for flood emergencies.
However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges in
the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency across
districts.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 196
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 2024.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• The predominant land use within RD 2024 is agriculture, which makes up approximately 95
percent of the district's territory. Some areas of RD 2024 are designated for wildlife habitat
and waterfowl. Residential uses are limited, featuring only two single-family homes, as
well as additional housing for farmworkers and caretakers.
• There are no anticipated changes in land use in the foreseeable future.
• RD 2024 is predominantly agricultural with no anticipated population growth or
development in the near future, indicating that demand for public services will remain
stable.
• RD 2024 manages approximately 14.3 miles of levees, along with drainage channels, two
pump stations, and a floodgate.
• The District has significantly improved the Palm and Orwood Tract levee systems.
Currently, the entire Palm Tract and 97 percent for Orwood Tract levees meet or exceed
the HMP standard.
Additionally, the entire Palm Tract levee system now meets or exceeds both PL 84-99 and
Bulletin 192-82 standards, while less than a mile of the Orwood Tract levee does not meet
these higher criteria.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 197
• In addition to existing levee standards, RD 2024 has a District Adopted Template (DAT) for
levee construction and maintenance that aims to provide a higher level of protection,
enhance flood-fighting capabilities, and ensure the long-term stability and resilience of the
levee system.
• The updated 2023 five-year plan outlines extensive infrastructure improvement projects to
meet the District’s desired level of protection, which includes the DAT and additional
components addressing stability, seepage, and areas of concern.
• The District reports that overall service delivery is adequate; however, more stringent and
increasing regulations are expected to raise expenses. Furthermore, the District notes that
two landowners are delinquent in paying their assessments.
• There are no communities of interest within RD 2024.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 2024 sphere of influence.
It is recommended that the Commission reaffirm the current SOI for RD 2024.
Ch. 8 RD 2024 Policy Consulting Associates, LLC 198
9 . RECL A MAT ION DIST RIC T 2 02 5
Reclamation District (RD) 2025 (Holland Tract) was formed in April 1918 as an independent
special district. RD 2025 is situated in the western Delta, south of Franks Tract and Bethel
Island, east of Hotchkiss Tract, north of Veale Tract, and west of Bacon Island.
Holland Tract can be accessed via Delta Road, located southwest of the District and to the east
of the unincorporated community of Knightsen. At the northern end of Holland Tract Bridge,
Delta Road becomes Holland Tract Road. This road runs east to west along the southern border
of the District and north to south along the eastern border. Private levee roads provide
perimeter access around other areas of the island, while private agricultural service roads allow
access to the island’s interior.
Holland Tract is one of the eight western Delta islands identified by the California Department
of Water Resources (DWR) as critical to controlling salinity and protecting water quality for all
users. The population within RD 2025 is estimated to be approximately 3068, with no
anticipated population growth or development in the foreseeable future. Land use within the
District is primarily agricultural and recreational, including cattle grazing operations and two
marinas along the Delta waterways beyond the levees.
RD 2025 operates under Section 50000 of the State Water Code to provide services within the
District’s boundaries. The District is responsible for improving and maintaining levees and the
flood control system, which includes pumps and canal ditches.
The District’s perimeter levee system protects a diverse range of habitats, including riparian
(122.1 acres), marsh (287.5 acres), woody non-native (4.4 acres), herbaceous uplands (660.1
acres), and open water (68.1 acres). Agricultural operations are mainly corn and open pasture
used for grazing (2,896.1 acres).
68 Contra Costa LAFCO. Directory of Local Agencies, County Services Areas. Section 11: Reclamation Districts.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 199
RD 2025 has 17 landowners, with the Metropolitan Water District of Southern California
(MWD) owning approximately 75 percent of the island. MWD is a regional wholesaler that
supplies water to 26-member public agencies, serving approximately 19 million residents in Los
Angeles, Orange, Riverside, San Bernardino, San Diego, and Ventura counties.
Recognizing the Delta’s crucial link in statewide water infrastructure, Metropolitan purchased
several Delta islands in 2016, including two within Contra Costa County—Holland Tract and
Webb Tract—to explore ways to improve the Delta’s declining ecosystem and promote water
reliability.69
MWD’s activities in Holland Tract include leasing portions of the land for agricultural use. In
2024, MWD announced plans for the existing farmer to convert all corn crops to rice over a
five-year period, while continuing cattle grazing on a portion of the leased land. Maximizing rice
farming on MWD-owned Delta islands is prioritized to mitigate subsidence. 70
69 The Metropolitan Water District of Southern California, Fact Sheet. Multi-benefit Landscape Restoration on Webb Tract. April
2023.
70 San Diego County Water Authority, Metropolitan Water District Delegates’ Report, March 27, 2024.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 200
Figure 9-1: RD 2025 General Information
GENERAL information
Agency RD 2025 (Holland Tract)
343 East Main Street, Suite 715
Address Stockton, CA 95202
Principal Act California Water Code §50000 et seq.
Date Formed 1918
Population 30
Last SOI Update Novemeber 18, 2015
Improve and maintain levees and flood control
Services Provided system including pumps, canals and ditches
3; District Engineer, District Secretary, and
Employees Superintendent
Pamela A. Forbus, District Secretary
Contact Person Email: pamforbus@scglobal.net
Website https://hollandtract.org/
Board
Members Length of Term Term Expiration
Randall D. Neudeck, Chairman 4-Years 2027
David Bradshaw 4-Years 2027
Russell E. Ryan 4-Years 2025
The District encompasses approximately 4,090 acres or about 6.4 square miles. RD 2025 is
situated entirely within the Primary Zone of the Sacramento-San Joaquin Delta's primary zone
and outside the countywide urban limit line (ULL).
The current SOI for RD 2025 is coterminous with the District’s boundaries. The SOI was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 201
Figure 9-2: RD 2025 Boundaries and SOI
Ch. 9 RD 2025 Policy Consulting Associates, LLC 202
RD 2025 is governed by a three-member board of trustees elected by landowners to serve a
staggered four-year term, with each voter entitled to cast one vote per acre owned within the
District. Uncontested vacancies on the governing body are filled by appointment by the Board
of Supervisors.
The Board meets on an as-needed basis at 343 East Main Street, Suite 715, Stockton, CA 95202.
Meeting agendas are posted on the District’s website in compliance with the Brown Act71
(Government Code §§ 54954.2 and 54956), as amended by California AB 2257, which requires
agencies to make agendas available on their websites and in a publicly accessible physical
location at least 72 hours prior to regular meetings and at least 24 hours prior to special
meetings. The District also makes agenda packets for meetings dating back to 2020 available on
its website. To enhance transparency, it is recommended that the District also make all meeting
minutes available to the public.
Since the last MSR, the District has established a website that provides significant information
and various documents, including emergency response management resources, public notices,
board member information, and contact details. Additionally, significant financial reports, such
as the District’s Compensation Report, the State Controller’s Office Financial Transaction
Report, and Enterprise System Catalog, are readily accessible. To further ensure compliance and
transparency, it is recommended that the District also add annual budgets and audits on its
website.
Overall, constituent outreach is limited due to the small number of landowners. However, the
District posts notices at the District office and maintains an email distribution list for landowner
notification.
RD 2025 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
71 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 203
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.72
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 2025 is not considered a disadvantaged
community.
72 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 204
The District funds its operations and administration through property assessments from the
two landowners and grant funding from the State Delta Levee Subventions Program or Special
Grants for specific projects.
Assessments are levied at the discretion of the Board of Trustees based on the assessment
valuation of land or acreage within the District, adjusted for revenues received from the State
under the Levee Subvention Program or other grants. Approximately 83 percent of the total
assessment valuation land is concentrated with two landowners.
The District utilizes bank loans in the form of short-term “warrants” to finance the cash flow
and fund large-scale projects. During FY 21-22 and FY 22-23, the District borrowed funds
through registered warrants issued by the Bank of Stockton. At the end of FY 21-22, the District
had an outstanding warrant balance of $825,000 after borrowing an additional $300,000 during
the year and repaying $425,000 of previously issued warrants.73 During FY 22-23, the District
issued another $375,000 in new warrants and repaid $300,000, resulting in a net increase in
outstanding debt to $900,000.74
The District operates out of a governmental fund that consists of a general fund, which finances
the District’s general services. Assessments and other revenue sources that support the
District's primary operations are included in this fund. This fund is charged with all operating
costs that do not have a separate fund established.
73 Reclamation District No. 2025. Financial Statements and Independent Auditor’s Report. June 30, 2022. p.19-20.
74 Reclamation District No. 2025. Financial Statements and Independent Auditor’s Report. June 30, 2023. p.20.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 205
Figure 9-3: RD 2025 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Revenues FY 21-22 FY 22-23 % Change
Assessments $346,905 $369,602 7
State Assistance—Subventions $52,830 $80,473 52
State Assistance— Five-Year Plan $1,205 - -100
Miscellaneous Revenue $6,215 - -100
Penalties and Interest on Assessments - $17,268 100
Total Revenue $407,155 $467,343 15
Expenditures
Utilities $53,747 $80,031 49
Payroll Expenses $74,822 $75,670 1
Levee Repairs and Maintenance $33,449 $59,645 78
Engineering $26,382 $57,868 119
Legal and Accounting $35,415 $46,589 32
Vegetation Control $18,313 $42,755 133
Insurance $15,870 $19,828 25
Rental Equipment $4,167 $14,037 237
Pump and Drainage Repairs and
Maintenance $67,619 $8,638 -87
Mileage $5,610 $6,380 14
Miscellaneous - $5,235 100
Water Rights Fee $2,678 $2,846 6
Dues and Memberships $1,972 $1,879 -5
Office Expense $621 $583 -6
Fuel $594 $545 -8
Storage $360 $360 0
Miscellaneous $73 - -100
Capital Outlay $29,455 - -100
Debt Service
Ch. 9 RD 2025 Policy Consulting Associates, LLC 206
Principal $425,000 $300,000 -29
Interest $69,159 $44,884 -35
Total Expenditures $865,306 $767,773 -11
Excess (deficiency) of Revenues Over
Expenditures Prior to Other Financing
Sources (Uses) $(458,151) $(300,430) 34
Total Other Financing Sources (Uses) $300,000 $375,000 25
Net Change in Fund Balance (deficit) $(158,151) $74,570 147
Fund Balance, Beginning of Year $(1,586) $(159,737) (9,972)
Fund Balance, End of Year $(159,737) $(85,167) 47
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 22-23, the District’s total expenses of $767,773 exceeded total revenue (excluding other
financing sources) of $467,343 by $300,430, or approximately 64 percent. Similarly, in FY 21-22,
the District’s total expenses of $865,306 exceeded total revenue (excluding other financing
sources) of $407,155 by $458,151, or 112 percent.
As shown in Figure 9-3, total revenue (excluding other financing sources) increased from
$407,155 in FY 21-22 to $467,343 in FY 22-23, representing a 15 percent increase. This growth
was primarily due to a 52 percent increase in subvention grants.
In contrast, total expenses decreased by 11 percent during this period, from $865,306 to
$767,773, despite increases in most categories. This is primarily driven by a $149,275 decrease
in debt service, from $494,159 to $344,884, and a significant decline in pump and drainage
repairs and maintenance, from $67,619 to $8,638.
The District’s ending fund balance was at a deficit in both FY 21-22 and FY 22-23, improving by
47 percent from $(159,737) in FY 21-22 to $(85,167) in FY 22-23. However, the ongoing
Ch. 9 RD 2025 Policy Consulting Associates, LLC 207
negative fund balance indicates that the District lacks sufficient reserves to adequately cover
operating costs or address any unexpected expenses and revenue shortfalls.
According to the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD 2025
(Holland Tract) is designated as high priority. This designation applies to levees that significantly
reduce flood risks to human life, protect state water supplies from saltwater intrusion, and
sustain critical ecosystems or agricultural lands vital to the Delta region.
Based on this prioritization, RD 2025 may qualify for future levee improvement grants as
funding becomes available. However, funding eligibility will depend on the progress of projects
classified as very high priority. This is not an immediate opportunity and depends on the
progress of projects that hold even higher priority levels.
The District’s levee system includes approximately 10.96 miles of non-project levee: 3.96 miles
along Old River/Holland Cut, 4.60 miles along Sand Mound Slough, and 2.40 miles along Rock
Slough. The District also maintains other key infrastructure, including a network of about 24
siphons for irrigation and three pumping stations.
Since 1900, there has been one recorded flooding incident on Holland Tract, which occurred on
January 18, 1980, when floodwaters breached a levee and created a blowout pond on the
island’s north end. The USACE installed emergency pumps, which operated until April 25, 1980,
and the water was fully drawn down by May 5, 1980. No other breaches or flooding events
have been recorded since.75
The District conducts levee surveys at least once every five years. While RD 2025 does not have
a formal inspection procedure, daily inspections are conducted by on-site farmers, with
increased frequency during severe weather conditions.
75 Reclamation District No. 2025 Holland Tract, 2022 Five-Year Plan. October 13, 2022. p.2-6.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 208
Currently, the District’s entire levee system meets or exceeds the Hazard Mitigation Plan
(HMP).
RD 2025 has an updated 2022 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
In 2009, the District’s Five-Year Plan proposed five phases of levee improvement projects,
including levee rehabilitation, installation of splash berms for added protection, and removal of
encroachments, all of which have been completed. These rehabilitation projects have raised
and widened various sections of the levee, resulting in over 85 percent (approximately 9.3
miles) of the District’s levee now meeting the PL 84-99 standard.
According to the updated 2022 Five-Year Plan, the District’s long-term goal is to meet the
Bulletin 192-82 levee standard within a five-year period. Currently, approximately 7.3 miles, or
66 percent, of the levee system meets this standard.
The proposed rehabilitation plan consists of three phases, including improving the District’s
levee to the Bulletin 192-82 standard using onsite fill; armoring the waterside slope of the east
levee with riprap; and addressing sections of the south levee with minimal overbuild above the
HMP minimum elevation through ongoing monitoring and adding material to the crown as the
underlying foundation material consolidates, in order to maintain elevation standards.
The estimated cost to complete all the outlined projects is $9.3 million. The Five-Year Plan
assumes that funding will be available under the Delta Levees Special Flood Control Projects
Program as the District implements the rehabilitation projects over the identified five-year
period. The District has participated in the Special Projects program since its formation.
It is recommended that the District make the updated Five-Year Plan available on its website to
further enhance transparency.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 209
Figure 9-4: RD 2025 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 10.96 Surface Elevation 5 to -22 ft
Miles of Levees Levee Miles by Type
Dry Land Levee 0.0
HMP Standard 10.961 Urban Levee 0.0
PL 84-99 Standard 9.32 Agricultural Levee 10.96
Bulletin 192-82 Standard 7.33 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 3
Detention Basins(s) No Bridges No
Floodplain
FIRM Designation AE Base Flood Elevation 7 feet
Levee Inspection Practices
RD 2025 does not have a formal levee inspection procedure. Instead, daily inspections are
performed by on-site farmers. During severe weather events, levee inspections are performed
w ith increased frequency.
Levee Segment Description Condition
Meets HMP and PL84-99
Old River/Holland Cut Eastern District boundary Standard
Meets HMP and PL84-99
Sand Mound Slough Western District boundary Standard
Meets HMP standard, while
some sections fall below PL84-
Rock Slough Southern District boundary 99 Standard
Levee Maintenance
Maintenance Cost per Levee Mile Maintenance Cost per Levee
(FY 21-22) $3,051 Mile (FY 22-23) $5,442
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles.
Infrastructure Needs/Deficiencies
Ch. 9 RD 2025 Policy Consulting Associates, LLC 210
The District has not identified any immediate infrastructure needs; however, planned
infrastructure improvements include strengthening levee standards, armoring the waterside
slope on the east levee with rip rap, and monitoring potential low areas in the southern section
of the levee to ensure they continue to meet the minimum HMP elevation.
1: The District’s entire levee system meets or exceeds the HMP standard.
2: Roughly 85 percent of the levee system meets or exceeds the PL 84-99 Levee Standard.
3: 66 percent of the District’s levee system meets or exceeds the Bulletin 192-82 Levee
Standard. This standard is the Distritct’s current desired level of protection.
The District contracts out for all major services, including levee maintenance, flood control,
drainage, levee access road upkeep, weed abatement, slope protection, vector/rodent control,
and levee patrol.
RD 2025 shares share administrative facilities, legal counsel, engineering services, and auditors
with other reclamation districts in Contra Costa and San Joaquin counties. Furthermore, the
District shares a Board of Trustees with RD 2026 (Webb Tract) and two San Joaquin County
reclamation districts, RD 756 and RD 2028.
These collaborative resource-sharing efforts significantly reduce costs for all participating
districts and enhance operational efficiency.
The District has not reported any significant infrastructure needs.
The District has not identified any significant challenges in service delivery.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 211
The 2015 MSR recommended a governance structure option for the District to establish mutual
aid agreements with nearby reclamation districts to formalize capacity and resource-sharing
plans during flood emergencies. However, this recommendation has not yet been
implemented.
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks during flood events. It is recommended
that the District explore this option to address shared challenges in the Delta region and
strengthen community resilience.
Additionally, the District can further explore its existing resource-sharing efforts with
neighboring reclamation districts in Contra Costa and San Joaquin counties to identify new
opportunities for collaboration and cost-sharing.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 212
9-1: RD 2025 has 17 landowners, with the Metropolitan Water District of Southern
California (MWD) owning approximately 75 percent of the island. The District has a
population of approximately 30, with no anticipated population growth or
development in the foreseeable future
9-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097; hence, the calculated threshold of $67,277 defines whether a community is
identified as disadvantaged. According to the DWR Mapping Tool, the entirety of the
RD 2025 area is not considered a disadvantaged community.
9-3: The District is responsible for improving and maintaining levees and the flood control
system, which includes pumps and canal ditches.
9-4: The District contracts out for all major services, including levee maintenance, flood
control, drainage, levee access road upkeep, weed abatement, slope protection,
vector/rodent control, and levee patrol.
9-5: The District’s key infrastructure includes roughly 10.96 miles of non-project levee, a
network of about 24 siphons for irrigation, and three pumping stations.
9-6: The entire levee system meets or exceeds the HMP standard, while roughly 85 percent
of the levee system meets or exceeds the PL 84-99 levee standard. The District’s
current desired level of protection is Bulletin 192-82 levee standards, which 66
percent of the District’s levee system meets.
9-7: Planned infrastructure improvements, as identified in the District’s Five-Year Plan,
include strengthening levee standards to meet the Bulletin 192-82 levee standards,
armoring the waterside slope on the east levee with rip rap, and monitoring potential
low areas in the southern section of the levee to ensure they continue to meet the
minimum HMP elevation.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 213
It is anticipated that funding for the rehabilitation projects will be available under the
Delta Levees Special Flood Control Projects Program.
9-8: The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
9-9: RD 2025 funds its operations and administration through property assessments from
the two landowners and grant funding from the State Delta Levee Subventions
Program or Special Grants for specific projects
9-10: The District also utilizes short-term bank loans, referred to as "warrants," to support
cash flow and fund large-scale projects. As of FY 22-23, the District has a total
outstanding debt of $900,000 in warrants.
9-11: In FY 21-22 and FY 22-23, total expenses exceeded total revenue (excluding other
financing sources) by 112 and 64 percent, respectively. During this period, total
revenue rose by 15 percent, from $407,155 in FY 21-22 to $467,343 in FY 22-23,
primarily due to a 52 percent rise in subvention grants.
In contrast, total expenses decreased by 11 percent during this period, from $865,306
to $767,773, despite increases in most categories. This was primarily driven by a
$149,275 decrease in debt service, from $494,159 to $344,884, and a significant
decline in pump and drainage repairs and maintenance, from $67,619 to $8,638.
9-12: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
2025 is designated as “high priority.” This designation positions the District for future
funding and potentially qualifies it for levee improvement grants as they become
available. However, this is not an immediate opportunity and depends on the
progress of projects with even higher priority levels.
9-13: The District has not identified additional potential funding opportunities.
9-14: RD 2025 also engages in resource sharing practices with other reclamation districts in
Contra Costa and San Joaquin Counties for administrative facilities, legal counsel,
engineering services, and auditing services.
Furthermore, the District shares a Board of Trustees with RD 2026 (Webb Tract) and
two San Joaquin County reclamation districts, RD 756 and RD 2028.
These collaborative resource-sharing efforts significantly reduce costs for all
participating districts and enhance operational efficiency.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 214
9-15: RD 2025 is governed by a three-member board of trustees, each serving staggered
four-year terms.
9-16: Since the 2015 MSR, the District has launched a website that offers various
information, including an archive of agenda packets for meetings held since 2020,
public notices, board member information, contact details as well as key financial
reports such as, the District’s Compensation Report, the State Controller’s Office
Financial Transaction Report, and Enterprise System Catalog.
To further improve transparency, it is recommended that the District ensure that an
up-to-date Five-Year Plan, audits, budgets, and meeting minutes are readily
accessible on its website.
9-17: The 2015 MSR also recommended establishing a regional mutual aid agreement with
nearby reclamation districts to formalize resource-sharing plans for emergencies.
However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges
in the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency across
districts.
Additionally, the District can further explore its existing resource-sharing efforts with
neighboring reclamation districts in Contra Costa and San Joaquin counties to identify
new opportunities for collaboration and cost-sharing.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 215
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by Cortese-
Knox-Hertzberg Local Government Reorganization Act of 2000. The following determinations
are proposed for Reclamation District 2025.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• Land use within the District is primarily agricultural and recreational, including cattle
grazing operations and two marinas along the Delta waterways beyond the levees.
• There are no anticipated changes in land use in the foreseeable future.
• The District anticipates no population growth or development in the near future, indicating
in a limited demand for public services.
• The District’s key infrastructure includes roughly 10.96 miles of non-project levee, a
network of about 24 siphons for irrigation, and three pumping stations.
• The entire levee system meets or exceeds the HMP standard, while roughly 85 percent of
the levee system meets or exceeds the PL 84-99 levee standard. The District’s current
desired level of protection is Bulletin 192-82 levee standards, which 66 percent of the
District’s levee system meets.
• Planned infrastructure improvements, as identified in the District’s Five-Year Plan, include
strengthening levee standards to meet the Bulletin 192-82 levee standards, armoring the
waterside slope on the east levee with rip rap, and monitoring potential low areas in the
southern section of the levee to ensure they continue to meet the minimum HMP
elevation.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 216
• The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
• There are no communities of interest within RD 2025.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 2025 sphere of influence.
It is recommended that the Commission reaffirm the current SOI for RD 2025.
Ch. 9 RD 2025 Policy Consulting Associates, LLC 217
1 0 . RECL A MAT ION DIST RIC T 2 02 6 (W EB B
Reclamation District (RD) 2026 (Webb Tract) was established in 1918 as an independent special
district and operates under Section 50000 of the California State Water Code. Within its
boundary area, which encompasses the entire Webb Tract, RD 2026 is responsible for
maintaining and improving levees and the flood control system, which includes pumps and
canal ditches. The District also facilitates irrigation water delivery to Webb Tract via gravity flow
through the District’s drainage infrastructure.76
Located in the northeastern corner of Contra Costa County, RD 2026 is one of the eight western
Delta islands that the Department of Water Resources (DWR) has identified as critical to
controlling salinity in the Delta and protecting water quality for all users. The District’s location
in the western Delta and its proximity to flooded Franks Tract, Old River, and Rock Slough
combine to make the District’s reliability and sustainability significant to regional interests.
RD 2026 can only be accessed by ferry, personal watercraft, or barge from Jersey Island. The
District operates the Victory II ferry service as part of the Delta Ferry Authority, a Joint Powers
Authority (JPA) formed with Bradford Island (RD 2059). The ferry provides services from Jersey
Island to both Webb Tract and Bradford Island.
According to the District, one resident lives on the island, and no future growth is anticipated.
RD 2026 is owned by the Metropolitan Water District of Southern California (MWD). MWD is a
regional wholesaler that delivers water to 26 public agencies serving approximately 19 million
people in parts of Southern California. In 2016, recognizing the importance of the Delta in
76 The Metropolitan Water District of Southern California, Request for Proposals to Lease Farmland in the Sacramento- San
Joaquin Bay Delta for Rice Cultivation Purposes. March 10, 2025.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 218
California's water system, MWD purchased several Delta islands, including Webb Tract, to
enhance the Delta ecosystem and improve water reliability.77
MWD is currently working to transform Webb Tract from conventional agricultural use to
wetlands and rice farming. This shift in land use will promote sustainable agriculture, reduce
greenhouse gas emissions that contribute to climate change, and restore critical habitats for
local species. In 2023, MWD received a $20.9 million grant from the Delta Conservancy’s
Nature-Based Solutions: Wetland Restoration Grant Program to fund the project. The grant will
facilitate the design and construction of up to 3,500 acres of managed wetlands and 1,500 acres
of rice fields.
77 The Metropolitan Water District of Southern California, Fact Sheet. Multi-benefit Landscape Restoration on Webb Tract. April
2023.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 219
Figure 10-1: RD 2026 General Information
GENERAL information
Agency RD 2026 (Webb Tract)
343 East Main Street, Suite 715
Address Stockton, CA 95202
Principal Act California Water Code §50000 et seq.
Date Formed 1918
Population 1 landowner; 1 resident
Last SOI Update November 18, 2015
Improve and maintain levees and flood control
system including pumps, canals and ditches; operate
Services Provided ferry service as part of a Joint Powers Authority
3; District Engineer, District Secretary, and
Employees Superintendent
Pamela A. Forbus, District Secretary
Contact Person Email: pamforbus@scglobal.net
Website https://webbtract.org/
Board
Members Length of Term Term Expiration
Randall D. Neudeck, Chairman 4-Years 2027
Russell E. Ryan 4-Years 2027
David Bradshaw 4-Years 2025
RD 2026 covers 5,500 acres or approximately 8.6 square miles. The District is located in the
western Delta, north of Franks Tract and Bethel Island, east of Bradford and Sherman Islands,
and south of Twitchell and Brannan-Andrus Islands.
The District is within the Primary Zone of the Sacramento-San Joaquin Delta, outside the
countywide urban limit line (ULL).
The current SOI for RD 2026 is coterminous with the District’s boundaries. The SOI was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 220
Ch. 10 RD 2026 Policy Consulting Associates, LLC 221
Figure 10-2: RD 2026 Boundaries and SOI
Ch. 10 RD 2026 Policy Consulting Associates, LLC 222
RD 2026 is governed by a three-member board of trustees elected by landowners to serve
staggered four-year terms. Each voter is entitled to cast one vote per acre owned within the
District. Pursuant to Government Code Section 1780, uncontested vacancies on the governing
body can be filled by appointment from either the remaining Trustees or the County Board of
Supervisors.
The Board meets monthly at 12:00 p.m. at 343 East Main Street, Suite 715, Stockton, CA 95202.
Meeting agendas are posted on the District’s website in compliance with the Brown Act78
(Government Code §§ 54954.2 and 54956), as amended by California AB 2257, which requires
agencies to make agendas available on their websites and in a publicly accessible physical
location at least 72 hours prior to regular meetings and at least 24 hours prior to special
meetings. The District's website also provides agenda packets for meetings dating back to 2020.
It is recommended that the District also make all meeting minutes available to the public.
Since the last MSR, the District has established a website that provides comprehensive
information and various documents, including emergency response management resources,
public notices, board member details, and contact information. Additionally, significant
financial reports, such as the District’s Compensation Report, the State Controller’s Office
Financial Transaction Report, and Enterprise System Catalog, are readily accessible. To further
ensure compliance and transparency, it is recommended that the District add annual budgets
and audits to its website.
RD 2026 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
78 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 223
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.79
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 2026 is not considered a disadvantaged
community.
79 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 224
The District funds its operations and administration through assessments, state assistance from
the State Delta Levee Subventions Program, or Special Grants for specific projects. Assessments
are levied at the discretion of the Board of Trustees based on the assessment valuation of land
or acreage within the District.
The District utilizes bank loans in the form of short-term “warrants” to support cash flow and
fund large-scale projects. During FY 21-22 and FY 22-23, the District borrowed funds through
registered warrants issued by the Bank of Stockton. In FY 21-22, the District borrowed $150,000
in registered warrants and repaid the full amount by the end of the fiscal year.80 In FY 22-23,
the District issued $925,000 in registered warrants and repaid $475,000, resulting in an
outstanding balance of $450,000 at the end of the fiscal year.81
The District operates out of a governmental fund that consists of a general fund, which finances
the District's general services. Assessments, state assistance, and other revenue sources that
support the District's primary operations are included in this fund. This fund is charged with all
operating costs that do not have a separate fund established.
80 Reclamation District No. 2026. Financial Statements and Independent Auditor’s Report. June 30, 2022. p.20.
81 Reclamation District No. 2026. Financial Statements and Independent Auditor’s Report. June 30, 2022. p.21-22.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 225
Figure 10-3: RD 2026 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Revenues FY 21-22 FY 22-23 % Change
Assessments $564,923 $662,112 17
State Assistance—Subventions $76,700 $148,640 94
State Assistance— Five-Year Plan $3,558 -
Interest Income $701 $140 -80
Total Revenue $645,882 $810,892 26
Expenditures
Delta Ferry Operations $202,175 $108,000 -47
Payroll Expenses $159,084 $178,580 12
Equipment Rent $130,479 $118,816 -9
Levee Maintenance $109,047 $215,574 98
Utilities $80,627 $65,196 -19
Pump and Drainage Repairs and
Maintenance $76,506 $56,708 -26
Other Maintenance $62,727 $114,370 82
Legal and Accounting $37,428 $48,655 30
Engineering $28,174 $74,364 164
Mileage $25,654 $20,106 -22
Vegetation Control $24,653 $32,353 31
Security Services $21,632 $48,542 124
Insurance $18,397 $29,226 59
Fuel $14,693 $9,961 -32
Water Supply - $26,355 100
Mileage - $20,106 100
Dues and Memberships $8,279 $8,358 1
Office Expense $4,823 $4,268 -12
Professional Fees - $7,847 100
Licenses and Permits $4,537 $3,660 -19
Ch. 10 RD 2026 Policy Consulting Associates, LLC 226
Rodent Control $2,447 $1,960 -20
Small Tools and Supplies $1,329 -100
Storage $407 $534 31
Miscellaneous $169 $1,079 538
Debt Service
Principal $150,000 $475,000 217
Interest $1,344 $7,604 466
Total Expenditures $1,164,611 $1,657,116 42
Excess (deficiency) of Revenues Over
Expenditures Prior to Other Financing
Sources (Uses) $(518,729) $(846,224) -63
Total Other Financing Sources (Uses) $150,000 $925,000 517
Net Change in Fund Balance (deficit) $(368,729) $78,776 121
Fund Balance, Beginning of Year $112,295 $(256,434) -328
Fund Balance, End of Year $(256,434) $(177,658) 31
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 21-22, the District’s total expenses of $1,164,611 exceeded total revenue (excluding other
financing sources) of $645,882 by $518,729 or approximately 80 percent. Similarly, in FY 22-23,
the District’s total expenses of $1,657,116 exceeded total revenue (excluding other financing
sources) of $810,892 by $846,224, or approximately 104 percent.
As shown in Figure 10-3, total revenue (excluding other financing sources) increased by 26
percent from $645,882 in FY 21-22 to $846,223 in FY 22-23. This growth was primarily driven by
a 94 percent increase in subvention grants, which rose from $76,700 in FY 21-22 to $148,640 in
FY 22-23.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 227
Total expenses also increased by 42 percent during this period, from $1,164,611 to $1,657,116,
largely due to higher expenses in various categories, including engineering, security services,
debt service for registered warrants, and levee maintenance.
The District’s ending fund balance remained in deficit in both fiscal years, improving by 31
percent from $(256,434) in FY 21-22 to $(177,658) in FY 22-23. However, this improvement is
primarily attributable to the issuance of $925,000 in registered warrants during FY 22–23, of
which $475,000 was repaid by the end of the year. This also shows the District’s reliance on
registered warrants to support cash flow. The ongoing negative fund balance indicates that the
District lacks sufficient reserves to adequately cover operating costs or address any unexpected
expenses and revenue shortfalls.
In 2023, the District Board engaged SCI Consulting Group to prepare an Engineer’s Report and
assist in forming a new Benefit Assessment, in accordance with Proposition 218 and the 1982
Benefit Assessment Act, to establish a Levee and Flood Control Facilities Improvement
Assessment for FY 23-24.
The Engineer’s Report emphasized that increasingly strict flood protection standards and the
ongoing need to repair and upgrade existing flood control infrastructure to meet all state and
federal standards, exceed the District’s existing revenue sources. Therefore, the District needs to
establish a reliable annual funding source that will generate approximately $4.89 million in
additional revenue each year.
A Levee and Flood Control Facilities Improvement Assessment was originally formed on January
17, 2019, following a Proposition 218-compliant ballot process. However, in both 2020 and
2023, the District identified several critical improvements and emergency response needs that
were not addressed in the initial assessment.
In 2020, these needs included an emergency response rock stockpile; equipment such as one
excavator, one loader, and one dump truck; and labor comprising three on-call operators
shared with RD 756 and RD 2028. The District also proposed establishing a fiscal reserve
Ch. 10 RD 2026 Policy Consulting Associates, LLC 228
equivalent to 50 percent of its annual operating budget, as well as funding for eastern levee
rehabilitation and minor capital improvement projects, including pumps and docks. In 2023, the
District also identified a major project expected to include the eventual replacement of key
infrastructure, such as major pump stations.
To support these expanded needs, the District initiated the formation of a new Levee and Flood
Control Facilities Improvement Assessment for FY 23–24 to replace the 2020 assessment.82 The
District reports that the new assessment has been approved by the Board of Trustees and is
currently in effect.
Gov. Code, § 54710(a)(2) authorizes local agencies providing flood control services to impose a
benefit assessment for financing services and improvements associated with flood control.
These assessments are levied annually, based on the District's expenditure budget for the fiscal
year.
All benefit assessments must also comply with Article XIIIC and XIIID of the California
Constitution, commonly referred to as Proposition 218. Proposition 218 allows for benefit
assessments to be levied to fund the costs of services, improvements, and maintenance or
operational expenses of public infrastructure that provides a special benefit to the assessed
property.
Proposition 218 prohibits assessments “imposed on any parcel which exceeds the reasonable
cost of the proportional special benefit conferred on that parcel”. Assessments must reflect
only the special benefit to the property, meaning benefits that are particular and distinct, over
and above any general benefits provided to the public at large. Moreover, such benefit is not
based on any one property owner’s specific use of the maintenance, operations, and
improvements activities or a property owner’s specific demographic status. 83
82 Reclamation District 2026, Webb Tract. Levee and Flood Control Facilities Improvement Assessment District. Engineer’s
Report, FY 23-24. SCI Consulting Group. March 2023.
83 Reclamation District No. 2059. Levee and Flood Control Facilities Improvement Assessment District. Preliminary Engineer's
Report, FY 22-23. p.7-16.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 229
Moreover, every parcel that receives a special benefit from the proposed improvements or
services must be assessed, including any parcels owned or used by a public agency, the State of
California, or the United States. Assessments must be supported by a detailed engineer’s report
prepared by a registered professional engineer certified by the State of California, as RD 2026
has done in 2023. The Report details the methodology for levying an assessment upon parcels
that receive a special benefit from the District’s flood control and levee maintenance service.
A special benefit is a particular and distinct benefit over and above the general benefits
conferred on real property located in the district or to the public at large. The total cost of the
Services must be apportioned among the properties being assessed, based on the
proportionate special benefit the properties will receive. Proposition 218 requires any local
agency proposing a new special assessment to “separate the general benefits from the special
benefits conferred on a parcel.” 84 The basis for separating special and general benefits is to
ensure that certain property owners are not charged for Services provided to the general public
or to property outside the assessment district.
Flood control operations, such as the District’s, provide only special benefits. Special benefits
are benefits that are “peculiar and distinct over and above general benefits located in the
district or to the public at large.” (Cal. Const. art. XIIID § 2(i).) Because flood control
infrastructure protects particular identifiable parcels (including residents of the parcel and any
appurtenant facilities or improvements) from damage due to inundation or force by rising
floodwaters, the benefits are provided directly to those parcels, and to none other.
Proposition 218 imposes a number of important procedural requirements for benefit
assessments, including: 85
• Public Hearing— Hold noticed public hearing.
• Written notice and ballots— must be mailed to property owners at least 45 days prior to
protest hearing. Notice must provide:
o the total amount chargeable to the entire district;
84 California Constitution Article. XIIID §4.
85 California Special District Association. Proposition 218, Guide for Special District. p.23.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 230
o the amount chargeable to the owner’s parcel;
o the duration of the payments;
o the reason for the assessment and the basis upon which it was calculated;
o the date, time, location of the public hearing;
o a ballot;
o a summary of the procedures for returning and tabulating the ballots;
o a statement that if a majority protest exists, the assessment will not be imposed.
• A resolution authorizing the special benefit assessment— stating a range of rates or
amounts; or providing that rate may be adjusted for inflation pursuant to defined
formula.
Another future funding opportunity for the District is through the Delta Stewardship Council’s
Delta Levee Investment Strategy (DLIS), which has designated Webb Tract as a very high
priority. This designation applies to levees that significantly reduce flood risks to human life,
protect state water supplies from saltwater intrusion, and sustain critical ecosystems or
agricultural lands vital to the Delta region in areas most at risk. Based on DLIS’s funding
prioritization, islands or tracts with these designations are given priority by DWR for levee
project funding.
The District’s infrastructure includes 12.9 miles of earthen levees, eight miles of irrigation
canals, and two pumping stations.
Since 1900, there have been two recorded flooding incidents on Webb Tract: the first in June
1950 and the second in January 1980; both failures resulted in deep and prolonged flooding.
The 1950 levee breach created the northern lake, while the 1980 breach resulted in the
blowout pond on the island’s east end. Water from the 1980 event was not fully drawn down
until February 1981.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 231
Similar to the other Delta islands, Webb Tract has experienced historical subsidence due to
peat. However, farming-related subsidence does not appear to be occurring close enough to
the levees to pose a stability concern.
The District rehabilitated its levee system to meet the HMP levee criteria in the early 1990s and
continues to maintain the levees to ensure compliance with this standard. The District also
maintains a well-developed all-weather road around the island.
Levees are inspected periodically by District maintenance staff and engineers, with increased
inspection frequency during severe weather events.
RD 2026 has an updated 2022 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
In 2009, the District’s Five-Year Plan proposed five phases of levee improvement projects,
including levee rehabilitation, splash berm installation for added protection, and removal of
encroachments. Due to funding limitations, only the first two phases, totaling 4.7 miles, were
completed by September 2013 along the north levee (adjacent to the San Joaquin River) and
the south levee (adjacent to Franks Tract). These projects raised and widened levee segments
to sustainably meet the PL 84-99 standard. Currently, about 62 percent (8 miles) of the
District’s levees meet this standard.
According to the updated 2022 Five-Year Plan, the District’s long-term goal is to meet the
Bulletin 192-82 levee standard within five years. Approximately 4.1 miles, or 32 percent, of the
levee system meets this standard. The proposed work consists of three phases of full levee
rehabilitation, followed by a final phase addressing areas requiring only minimal work.
Because Webb Tract is only accessible by boat or ferry, a timely emergency response can be a
challenge. Rehabilitating the levees to meet the Bulletin 192-82 standard would enhance the
level of protection for the island and potentially reduce the likelihood of emergency events.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 232
The estimated cost to complete all phases and successfully build the District’s levee to the
Bulletin 192-82 standard is approximately $21.3 million. The 2022 Plan assumes funding will be
available under the Delta Levees Special Flood Control Projects Program.
The Special Projects program has traditionally funded large-scale levee rehabilitation on Webb
Tract. The District has participated in the Special Projects Program since its formation and in the
Subventions Program since 1988.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 233
Figure 10-4: RD 2026 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 12.9 Surface Elevation 5 to -25 ft
Miles of Levees by Standard Levee Miles by Type
Dry Land Levee 0.0
HMP Standard 12.9 1 Urban Levee 0.0
PL 84-99 Standard 8.0 2 Agricultural Levee 12.9
Bulletin 192-82 Standard 4.1 3 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 2
Detention Basins(s) No Bridges No
Floodplain
FIRM Designation AE Base Flood Elevation 7 ft
Levee Inspection Practices
The District levees are inspected periodially by maintenance staff and engineer.
Levee Segment Description Condition
Fisherman’s Cut Western District Boundary Meets HMP Standard
False River Southern District Boundary Meets HMP Standard
San Joaquin River Northern District Boundary Meets HMP Standard
Old River Eastern District Boundary Meets HMP Standard
Levee Maintenance
Maintenance Cost per Levee Maintenance Cost per Levee
Mile (FY 21-22) $8,453 Mile (FY 22-23) $16,711
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles.
Infrastructure Needs/Deficiencies
The District has not identified any immediate infrastructure needs; however, planned
infrastructure improvements include strengthening levee standards, enhancing seepage
control, and ongoing monitoring of levee segments that are near the minimum HMP criteria for
width and elevation.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 234
1: The District’s entire levee system meets or exceeds the HMP levee standard.
2: 62 percent of the District’s levee system meets or exceeds the PL84-99 standard.
3: 32 percent of the District’s levee system meets or exceeds the Bulletin 192-82 levee
standard. This standard is the District’s desired level of protection.
The District contracts out for all major services, including routine levee maintenance operations
such as encroachment control, erosion repair, gate maintenance, inspections, rodent control,
seepage control, surveying and engineering, tree trimming, and vegetation control.
As mentioned previously, the District participates in the Delta Ferry Authority (DFA), a Joint
Powers Authority with Bradford Island (RD 2059), to provide ferry services facilitating access to
the island. Under the DFA Joint Powers Agreement, the Districts share operational costs for
ferry services, including repairs, dry dock maintenance, inspections, and administrative and
accounting support.
Additionally, RD 2026 collaborates with other reclamation districts in Contra Costa and San
Joaquin counties by sharing administrative facilities as well as legal, engineering, audit, and
other administrative services. Furthermore, the District shares a Board of Trustees with RD
2025 (Holland Tract) and two reclamation districts in San Joaquin County, RD 756 and RD 2028,
all of which are owned by a single or limited number of landowners.
These collaborative resource-sharing efforts significantly reduce costs for all participating
districts and enhance operational efficiency.
The District has not reported any significant infrastructure needs. However, some areas that
have not been recently rehabilitated have minimal overbuild above the HMP minimum
elevation. As the underlying foundation material continues to consolidate, the District must
regularly add material to the levee crown to maintain minimum elevation standards.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 235
Historically, seepage has been observed below the pump station discharge pipes on the south
levee. To address this, additional fill material was placed on the toe berm to lengthen the
seepage path and support the levee embankment. While seepage has slowed, the area
continues to be monitored, and additional rehabilitation may be needed in the future.
The District has not identified any significant challenges in service delivery.
The 2015 MSR recommended a governance structure option for the District to establish mutual
aid agreements with nearby reclamation districts to formalize capacity and resource-sharing
plans during flood emergencies. However, this recommendation has not yet been
implemented.
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks during flood events. It is recommended
that the District explore this option to address shared challenges in the Delta region and
strengthen community resilience.
Alternatively, the District could establish a mutual aid agreement with RD 2026 to build on the
existing DFA partnership and formalize plans for capacity and resource-sharing for reclamation
services. This could help the District reduce individual costs, avoid significant expenses
associated with independently owning or leasing equipment, and support long-term financial
stability.
Additionally, the District can further explore its existing resource-sharing efforts with
neighboring reclamation districts in Contra Costa and San Joaquin counties to identify new
opportunities for collaboration and cost-sharing.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 236
10-1: RD 2026 has one landowner: the Metropolitan Water District of Southern California
(MWD), a regional wholesaler that delivers water to 26 public agencies serving
approximately 19 million people in parts of Southern California.
The District had one permanent resident, with no anticipated population growth or
development in the foreseeable future.
10-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097; hence, the calculated threshold of $67,277 defines whether a community is
identified as disadvantaged. According to the DWR Mapping Tool, the entirety of the RD
2026 area is not considered a disadvantaged community.
10-3: The District is responsible for maintaining and improving levees and the flood control
system, which includes pumps and canal ditches. The District also facilitates irrigation
water delivery to Webb Tract via gravity flow through the District’s drainage
infrastructure.
10-4: The District contracts out for all major services, including routine levee maintenance
operations such as encroachment control, erosion repair, gate maintenance,
inspections, rodent control, seepage control, surveying and engineering, tree trimming,
and vegetation control.
10-5: The District’s key infrastructure includes 12.9 miles of earthen levees, eight miles of
irrigation canals, and two pumping stations.
10-6: The entire levee system meets or exceeds the HMP standard, while roughly 62 percent
of the levee system meets or exceeds the PL 84-99 levee standard. The District’s current
desired level of protection is Bulletin 192-82 levee standards, which 32 percent of the
District’s levee system meets.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 237
10-7: Planned infrastructure improvements, as identified in the District’s Five-Year Plan,
primarily include strengthening levee standards to meet the Bulletin 192-82 levee
standards through full levee rehabilitation of levee projects while addressing areas
requiring only minimal work.
It is anticipated that funding for the rehabilitation projects will be available under the
Delta Levees Special Flood Control Projects Program.
10-8: No significant infrastructure needs have been reported; however, seepage control and
ongoing monitoring of levee segments that are near the minimum HMP criteria for
width and elevation are planned.
10-9: The District reports that current service delivery is generally adequate, with no
significant challenges.
10-10: RD 2026 funds its operations and administration through assessments, state assistance
from the State Delta Levee Subventions Program, or Special Grants for specific projects.
10-11: The District also utilizes short-term bank loans, referred to as "warrants," to support
cash flow and fund large-scale projects. As of FY 22-23, the District has a total
outstanding debt of $450,000 in warrants.
10-12: In FY 21-22 and FY 22-23, total expenses exceeded total revenue (excluding other
financing sources) by 80 and 104 percent, respectively. During this period, total
revenue increased by 26 percent, from $645,882 in FY 21-22 to $846,223 in FY 22-23,
primarily due to a 94 percent rise in subvention grants.
Total expenses also increased by 42 percent during this period, from $1,164,611 to
$1,657,116, largely due to higher expenses in various categories, including engineering,
security services, debt service for registered warrants, and levee maintenance.
10-13: The District’s existing revenue sources are insufficient to meet increasingly strict flood
protection standards and necessary infrastructure upgrades. In 2023, the District
engaged SCI Consulting Group to prepare an Engineer’s Report and assist with forming
a new Prop 218-compliant benefit assessment for FY 23–24.
This assessment aims to generate approximately $4.89 million annually to fund
infrastructure improvements and establish financial reserves. The new Levee and Flood
Control Facilities Improvement Assessment has been approved by the Board of
Trustees and is currently in effect.
10-14: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
2026 is designated as “vey-high priority.” This designation applies to levees that
Ch. 10 RD 2026 Policy Consulting Associates, LLC 238
significantly reduce flood risks to human life, protect state water supplies from
saltwater intrusion, and sustain critical ecosystems or agricultural lands vital to the
Delta region in areas most at risk. Based on DLIS’s funding prioritization, islands or
tracts with these designations are given priority by DWR for levee project funding.
10-15: The District has not identified additional potential funding opportunities.
10-16: RD 2026 participates in the Delta Ferry Authority (DFA), a Joint Powers Authority with
Bradford Island (RD 2059), to provide access to the island to provide ferry services.
Operational costs for ferry services are shared equally between the two districts.
The District also engages in resource-sharing practices with other reclamation districts
in Contra Costa and San Joaquin Counties for administrative facilities, legal counsel,
engineering services, and auditing services.
Furthermore, the District shares a Board of Trustees with RD 2025 (Holland Tract) and
two San Joaquin County reclamation districts, RD 756 and RD 2028.
These collaborative resource-sharing efforts significantly reduce costs for all
participating districts and enhance operational efficiency.
10-17: RD 2026 is governed by a three-member board of trustees, each serving staggered
four-year terms.
10-18: Since the 2015 MSR, the District has launched a website that offers various
information, including an archive of agenda packets for meetings held since 2020,
public notices, board member information, contact details as well as key financial
reports such as, District’s Compensation Report, the State Controller’s Office Financial
Transaction Report, and Enterprise System Catalog.
To further improve transparency, it is recommended that the District ensure that an
up-to-date Five-Year Plan, audits, budgets, and meeting minutes are readily accessible
on its website.
10-19: The 2015 MSR also recommended establishing a regional mutual aid agreement with
nearby reclamation districts to formalize resource-sharing plans for emergencies.
However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges in
the Delta region and strengthen community resilience. Developing such regional
Ch. 10 RD 2026 Policy Consulting Associates, LLC 239
partnerships could reduce shared expenses and improve operational efficiency across
districts.
Alternatively, the District can further explore its existing resource-sharing efforts with
neighboring reclamation districts in Contra Costa and San Joaquin counties to identify
new opportunities for collaboration and cost-sharing.
The District can also further explore its existing resource-sharing efforts with
neighboring reclamation districts in Contra Costa and San Joaquin counties to identify
new opportunities for collaboration and cost-sharing.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 240
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by Cortese-
Knox-Hertzberg Local Government Reorganization Act of 2000. The following determinations
are proposed for Reclamation District 2026.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• Metropolitan Water District of Southern California (MWD) is currently working to
transform Webb Tract from conventional agriculture to wetlands and rice farming to
promote sustainability, reduce greenhouse gas emissions, and restore local habitats. In
2023, MWD received a $20.9 million grant from the Delta Conservancy’s Wetland
Restoration Grant Program to design and construct 3,500 acres of managed wetlands and
1,500 acres of rice fields.
• The District has one resident, with no anticipated population growth or development in
the near future, indicating that demand for public services will remain stable.
• The District’s key infrastructure includes 12.9 miles of earthen levees, eight miles of
irrigation canals, and two pumping stations.
• The entire levee system meets or exceeds the HMP standard, while roughly 62 percent of
the levee system meets or exceeds the PL 84-99 levee standard. The District’s current
desired level of protection is Bulletin 192-82 levee standards, which 32 percent of the
District’s levee system meets.
• Planned infrastructure improvements, as identified in the District’s Five-Year Plan,
primarily include strengthening levee standards to meet the Bulletin 192-82 levee
standards through full levee rehabilitation of levee projects while addressing areas
requiring only minimal work.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 241
• No significant infrastructure needs have been reported; however, seepage control and
ongoing monitoring of levee segments that are near the minimum HMP criteria for width
and elevation are planned.
• There are no communities of interest within RD 2026.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 2026 sphere of influence.
It is recommended that the Commission reaffirm the current SOI for RD 2026.
Ch. 10 RD 2026 Policy Consulting Associates, LLC 242
1 1 . RECL A MAT ION DIST RIC T 2 05 9
Reclamation District (RD) 2059 (Bradford Island) is one of eight Delta islands considered critical
to the region’s water quality by DWR, as it helps prevent saltwater intrusion into the Delta.
Freshwater flows into the region from the Sacramento and San Joaquin Rivers, while saltwater
enters from the Pacific Ocean through San Francisco Bay. Bradford Island and other Delta
islands reduce the flow of this saltwater into the region.
The island’s marshes provide feeding grounds for ducks, cranes, swans, and geese, and birds of
prey such as Swainson’s, Cooper’s, and red-tailed hawks have also been seen in the area.
Bradford Island is a reclaimed peat wetland, with most of its land sitting below sea level and
protected from flooding by levees. These levees are maintained by Reclamation District No.
2059, which was formed to address flood protection concerns on the island. RD 2059 was
established as an independent special district on November 21, 1921, by petition of
landowners.
The District was formed under the laws of the State of California and is governed by Division 15
of the California Water Code (commencing with Section 50000). RD 2059 is responsible for the
maintenance, operation, and repair of the levee and flood control system on Bradford Island.
Bradford Island is primarily accessible by ferry; however, landowners with private docks can
also access the island by personal boat. Small private airstrips have also been used on Bradford
Island in the past.
The District operates the Victory II ferry service under the Delta Ferry Authority, a Joint Powers
Authority (JPA) formed with Webb Tract (RD 2026). The ferry offers services from Jersey Island
to both Webb Tract and Bradford Island.
Land use within RD 2059 is primarily agricultural. Other uses include residential areas,
commercial activities such as cattle grazing and commercial operations, as well as gas
Ch. 11 RD 2059 Policy Consulting Associates, LLC 243
extraction from wells located on the island. Additionally, multiple electrical transmission lines
run through the District.
According to the Contra Costa County Department of Conservation and Development, there are
36 landowners in the District.86 The district has a population of 12; however, the population
fluctuates due to seasonal residents. Currently, the District anticipates no population growth or
development in the foreseeable future.
Figure 11-1: RD 2059 General Information
GENERAL information
Agency RD 2059 (Bradford Island)
6329 Bethel Island Rd, Suite A
Address Bethel Island, CA
Principal Act California Water Code §50300 et seq.
Date Formed 1921
Population 12; may increase due to seasonal residents
Last SOI Update Novemeber 18, 2015
Improve and maintain levees; maintain and operate flood control
system including pumps, canals and ditches; operate ferry service
Services Provided as part of a Joint Powers Authority
Employees 3; District Manager, Levee Superintendent, and District Engineer
Angelia Tant, District Manager/Secretary
Contact Person Email: bradford2059@gmail.com
Website https://bradfordisland.com
Board Members Length of Term Term Expiration
Rob Davies, President 4-Years 2025
William Hall 4-Years 2025
Charles Louie 4-Years 2025
Kevin Finta 4-Years 2027
Michael Craig 4-Years 2027
86 Contra Costa LAFCO. Directory of Local Agencies, County Services Areas. Section 11: Reclamation Districts.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 244
RD 2059 encompasses approximately 2,200 acres or about 3.4 square miles. The District is a
Delta Island located in the northeastern corner of Contra Costa County, adjacent to Sacramento
County in the north and west. The District is within the Primary Zone of the Sacramento-San
Joaquin Delta and is outside the countywide urban limit line (ULL).
The current SOI for RD 2059 is coterminous with the District’s boundaries. The SOI was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 245
Figure 11-2: RD 2059 Boundaries and SOI
Ch. 11 RD 2059 Policy Consulting Associates, LLC 246
RD 2059 is governed by a five-member board of trustees, elected by a majority vote during the
District's general election for staggered four-year terms, as specified in Article III Section 3.3 of
the District’s bylaws.87 Uncontested vacancies on the governing body are filled by appointment
by the Board of Supervisors in accordance with Government Code §1780, as outlined in
California Water Code §50604.
RD 2059 board members serve on a volunteer basis and do not receive compensation. The
Board meets on the First Tuesday of each month at 10:00 am at the Antioch Fairgrounds
Antioch Fair Grounds - 1201 W. 10th Street, Antioch. The District also offers residents the
option to participate in meetings via Zoom.
Meeting agendas are posted on the District’s website in compliance with the Brown Act88
(Government Code §§ 54954.2 and 54956), as amended by California AB 2257, which requires
agencies to make agendas available on their websites and in a publicly accessible physical
location at least 72 hours prior to regular meetings and at least 24 hours prior to special
meetings.
The District makes available agenda packets and minutes for meetings dating back to 2020;
however, the minutes for the two meetings held in 2024 are not readily available. It is
recommended that the District make all meeting minutes available on the website.
The District meets the requirements outlined in state laws, including those pertaining to the
Brown Act and website transparency under SB 92989, and follows best practices to ensure easy
access to important documents such as public records request forms, permits, board member
87 Resolution No. 2018-02, A Resolution of the Board of Trustees of Reclamation District No.2059 Amending District Bylaws
Following Approval By a Majority of the District Landowners.
88 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
89 Senate Bill 929 (The Special Districts Transparency Act), passed in 2018, established that beginning January 1, 2020, every
independent special district must maintain an internet website unless the governing board adopts a resolution declaring its
determination that a hardship exists that prevents the district from establishing or maintaining a website. The Act also outlines
the minimum information required to be available on the .
Ch. 11 RD 2059 Policy Consulting Associates, LLC 247
information, and contact details. The District also makes significant financial reports, including
annual budgets and audits. To further enhance transparency, it is recommended that the
District add Compensation Report and the State Controller’s Office Financial Transaction Report
available on the website in an easily accessible location.
RD 2059 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 248
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.90
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 2059 is not considered a disadvantaged
community.
90 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 249
The District operates out of a governmental fund that is comprised of the general and special
revenue funds. General fund accounts for resources that finance the general services that the
District performs. State assistance, assessments, and other sources of revenue used to finance
the fundamental operations of the District are included in this fund.
While special revenue fund accounts for the proceeds of specific revenue sources other than
special assessments or expendable trusts. Generally, resources accounted for in this fund
originate from state and federal programs.
RD 2059’s main sources of revenues are property owner assessments, levee subvention grants,
and ferry service fees. Assessments are levied at the discretion of the Board of Trustees.
Assessments are based on the assessment valuation of land or acreage within the District.
Approximately 73 percent of the total assessment valuation of District land is concentrated
with two landowners. The District’s initial assessment (CB assessment) was originally adopted
as an Operation and Maintenance Assessment, and it does not have an expiration date.
The District also had a second overlay assessment (2015 assessment) which was adopted to
make up for a budget shortfall for required maintenance and pump station repairs. The 2015
Assessment expired on June 30, 2020.91
Additionally, the District has long participated in the Delta Levees Special Projects and Delta
Levees Maintenance Subventions Programs for several years. The District has been successful in
receiving two Special Project Grants from the State of California’s Department of Water
Resources (DWR) since 2010, totaling $7.5 million and at a 100 percent grant funding level.92
The District’s portion of ferry service costs is partially funded by the sale of ferry tickets. The
District’s contribution to DFA for FY 22-23 was $117,625.
91 Bradford Island Reclamation District #2059. Newsletter for Proposition 218. May 2020.
92 Request for Information, RD 2059. November 2024.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 250
Ch. 11 RD 2059 Policy Consulting Associates, LLC 251
Figure 11-3: RD 2059 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Receipts FY 21-22 FY 22-23 % Change
Assessments $368,545 $180,716 -51
State Subventions $102,821 $66,993 -35
Permits and Fees $27,712 $50,799 83
Fire Insurance Income $602,372 $43,302 -93
Total Receipts $1,101,450 $341,810 -69
Disbursements
General and Administrative
Dues and Subscriptions $4,441 $1,625 -63
Insurance $5,655 $6,726 19
Legal and Professional Fees $25,576 $50,430 97
Payroll Expenses $96,101 $160,424 67
Other Administrative Costs $8,975 $33,883 278
Total General and Administrative $140,748 $253,088 80
Maintenance and Operations
Levee Repairs and Maintenance $300,081 $737,542 146
Engineering $47,232 $11,213 -76
Utilities $3,946 -
Ferry Assessment $120,750 $117,625 -3
Rent $1,590 $1,697 7
Fire-related Expense $518,376 $58,055 -89
Ferry Dock Repairs $83,000 -
Total Maintenance and Operations $1,074,975 $926,132 -14
Debt Service
Interest Expense $5 -
Total Debt Service $5 -
Total Disbursement $1,215,728 $1,179,220 -3
Ch. 11 RD 2059 Policy Consulting Associates, LLC 252
Excess (deficiency) of Receipts Over
Disbursements Prior to Other Financing
Sources (Uses) $(114,278) $(837,410) (632)
Total Other Financing Sources (Uses) - $400,000
Fund Balance, Beginning of Year $680,271 $565,993 -17
Fund Balance, End of Year $565,993 $128,583 -77
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 22-23, the District’s total expenses of $1,179,220 exceeded total revenues (excluding
other financing sources) of $341,810 by $837,410, or 244 percent. Similarly, in FY 21-22, the
District’s total expenses of $1,215,728 exceeded total revenues (excluding other financing
sources) of $1,101,450 by $114,728, or approximately 10 percent.
As shown in Figure 11-3, total revenue in FY 22-23 decreased by 69 percent to $341,810
compared to $1,101,450 in FY 21-22. This decline was due to a significant reduction in several
major income sources.
One of the largest income sources in FY 21-22 was fire insurance proceeds, which fell by 93
percent in FY 22-23 from $602,372 to $43,302. These proceeds were related to a major fire in
August 2021 that damaged multiple units and surrounding levee structures, requiring
immediate and extensive repairs. The District incurred fire-related repair costs of $518,376 in
FY 21-22 and $58,055 in FY 22-23.
Assessment revenue also decreased by 51 percent in FY 22-23, falling to $180,716 from
$368,545 in FY 21-22. Assessments are levied after deducting revenues received from the State
under the Levee Subvention Program or other income sources, which likely explains the year-
to-year fluctuation. Additionally, subvention grants decreased by 35 percent, from $102,821 in
FY 21-22 to $66,993 in FY 22-23.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 253
In contrast, total expenses for FY 21-22 and FY 22-23 remained relatively consistent, with a
slight decrease of approximately three percent, from $1,215,728 to $1,179,220.
The District’s fund balance at the end of FY 22-23 was $128,583, reflecting a 77 percent
decrease from the FY 21-22 ending fund balance of $565,993. This ending fund balance
represents 10 percent of FY 22-23 expenses, indicating that the District has enough reserves to
cover about a month of operating costs, assuming expenses remain relatively stable. However,
this reserve level is relatively low and may not adequately cover unexpected expenses or
revenue shortfalls.
Overall, the District’s taxes for levee operation and maintenance do not cover all maintenance
needs or provide the necessary funding to achieve the desired level of protection of the HMP
levee standard or the more stringent standard of PL84-99 or Bulletin 192-82.
While some properties within the District generate revenue, it is insufficient to fund long-term
improvements. Similarly, DWR’s Special Project Grants have provided critical funding for levee
improvements, extending their useful life. However, these grants do not cover ongoing
operation and maintenance costs.
As mentioned, the District previously collected an operations and maintenance tax from
landowners through Contra Costa County before it expired in 2020. In 2020, the District held a
Proposition 218 vote to continue funding operations and maintenance (in addition to the
Subventions funding). Additionally, the operation and maintenance of the ferry were also part
of the Proposition 218 tax. The vote did not pass, causing a significant budget shortfall for the
District.
The District plans to pursue another Proposition 218 maintenance tax in the near future to help
fund maintenance activities. The proposed assessment is intended to replace the revenue
generated from the expired 2020 assessment and establish revenue necessary for long‐term
fiscal sustainability.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 254
In FY 22-23, the District prepared a Preliminary Engineer’s Report in compliance with California
Government Code Sections 53750, 54710 et seq., and Article XIIID of the California
Constitution. The report was developed to assess and justify the need for the District to form a
Levee and Flood Control Facilities Improvement Assessment. The report reviewed the District’s
operations, existing funding sources, and projected funding needs for the near term. The report
estimated that the District would require approximately $268,716 in additional annual funding
to meet its operational, maintenance, and repair goals.
The report supports the establishment of such a revenue source through the formation of a
Proposition 218‐compliant, balloted Assessment that, if approved by property owners, would
replace the existing, expiring assessment roll revenue source. 93
Gov. Code, § 54710(a)(2) authorizes local agencies providing flood control services to impose a
benefit assessment for financing services and improvements associated with flood control.
These assessments are levied annually, based on the District's expenditure budget for the fiscal
year.
All benefit assessments must also comply with Article XIIIC and XIIID of the California
Constitution, commonly referred to as Proposition 218. Proposition 218 allows for benefit
assessments to be levied to fund the costs of services, improvements, and maintenance or
operational expenses of public infrastructure that provides a special benefit to the assessed
property.
Proposition 218 prohibits assessments “imposed on any parcel which exceeds the reasonable
cost of the proportional special benefit conferred on that parcel”. Assessments must reflect
only the special benefit to the property, meaning benefits that are particular and distinct, over
and above any general benefits provided to the public at large. Moreover, such benefit is not
93 Reclamation District No. 2059. Levee and Flood Control Facilities Improvement Assessment District. Preliminary Engineer's
Report, FY 22-23. p.7-10.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 255
based on any one property owner’s specific use of the maintenance, operations, and
improvement activities or a property owner’s specific demographic status. 94
Furthermore, every parcel that receives a special benefit from the proposed improvements or
services must be assessed, including any parcels owned or used by a public agency, the State of
California, or the United States. Assessments must be supported by a detailed engineer’s report
prepared by a registered professional engineer certified by the State of California, which RD
2059 completed in FY 22-23.
A special benefit is a particular and distinct benefit over and above the general benefits
conferred on real property located in the district or to the public at large. The total cost of the
Services must be apportioned among the properties being assessed based on the proportionate
special benefit the properties will receive. Proposition 218 requires any local agency proposing
a new special assessment to “separate the general benefits from the special benefits conferred
on a parcel.” 95 The basis for separating special and general benefits is to ensure that certain
property owners are not charged for Services provided to the general public or to property
outside the assessment district.
Flood control operations, such as the District’s, provide only special benefits. Special benefits
are benefits that are “peculiar and distinct over and above general benefits located in the
district or to the public at large.” (Cal. Const. art. XIIID § 2(i).) Because flood control
infrastructure protects particular identifiable parcels (including residents of the parcel and any
appurtenant facilities or improvements) from damage due to inundation or force by rising
floodwaters, the benefits are provided directly to those parcels, and to none other.
Proposition 218 imposes a number of important procedural requirements for benefit
assessments including: 96
• Public Hearing— Hold noticed public hearing.
94 Reclamation District No. 2059. Levee and Flood Control Facilities Improvement Assessment District. Preliminary Engineer's
Report, FY 22-23. p.7-16.
95 California Constitution Article. XIIID §4.
96 California Special District Association. Proposition 218, Guide for Special District. p.23.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 256
• Written notice and ballots— must be mailed to property owners at least 45 days prior to
the protest hearing. The notice must provide:
o the total amount chargeable to the entire district;
o the amount chargeable to the owner’s parcel;
o the duration of the payments;
o the reason for the assessment and the basis upon which it was calculated;
o the date, time, and location of the public hearing;
o a ballot;
o a summary of the procedures for returning and tabulating the ballots;
o a statement that if a majority protest exists, the assessment will not be imposed.
• A resolution authorizing the special benefit assessment— stating a range of rates or
amounts; or providing that rate may be adjusted for inflation pursuant to defined
formula.
If approved, the proposed assessment will fund essential operational improvements within the
District, including the maintenance and operation of flood protection facilities, levee
maintenance to HMP standards, and the maintenance of pump stations and internal drainage
systems. These efforts will help mitigate flood risks for residents and properties in the area.
Another future funding opportunity for the District is through the Delta Stewardship Council’s
Delta Levee Investment Strategy (DLIS), which has designated Bradford Island as high priority.
High-priority designation applies to levees that significantly reduce flood risks to human life,
protect state water supplies from saltwater intrusion, and sustain critical ecosystems or
agricultural lands that are vital to the Delta region.
Based on this funding prioritization, RD 2059 may qualify for future levee improvement grants
as funds become available. The availability of funding will depend on the progress of projects
designated at even higher priority levels or as very high priority.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 257
RD 2059 maintains and operates approximately 7.4 miles of levees, around seven miles of
related internal drainage canals, one pump station, and additional flood control infrastructure.
The District has a history of flooding; for instance, during the winter of 1982-83, the western
levee along the San Joaquin River failed. A scour hole several hundred feet wide allowed the
island to flood. The levee failure was assumed to have been caused by a rodent den. The
District also experienced a flood event in 1955. Both flooding events flooded the island,
destroying structures and crops. More recently, during the winter of 2017, king tides and high
water within the San Joaquin River nearly overtopped two low areas of the District’s levee
system. Sandbags were placed to prevent water from splashing onto the levee crown and the
landside of the levee.97
In recent years, flood risks have been minimized through regular maintenance. The District’s
levee superintendent conducts weekly visual inspections of the levee. If any issues are
identified, the District engineer is contacted for further inspection and maintenance work.
RD 2059 has an updated 2023 Five-Year Plan that outlines the District’s progress since the
previous five-year plans, the current level of protection, the desired level of protection, and the
strategy to achieve it.
In 2009 and 2014, the District raised levees and added splash caps and toe berms around most
of the island to meet HMP standards. However, approximately 600 feet of levee on the island’s
north side were not raised due to land acquisition and utility conflicts. While toe berm
construction has occurred in recent years, significant seepage continues at various locations
around the island.
Currently, the District aims to enhance the island's flood protection, starting with meeting the
Hazard Mitigation Plan (HMP) levee standard and progressing toward compliance with the
97 Five Year Plan, Reclamation District 2059, Bradford Island. Updated December 2023. p.4.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 258
PL84-99 standard. Of the District’s 7.4 miles of levee, the majority were raised to HMP
standards in 2014, with only approximately 600 feet currently below this standard.
It is recommended that the District make the updated Five-Year Plan available on its website to
further enhance transparency.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 259
Figure 11-4: RD 2059 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 7.4 Surface Elevation -5 to -15 feet
Miles of Levees by Standard Levee Miles by Type
Dry Land Levee 0.0
HMP Standard 7.3 1 Urban Levee 0.0
PL 84-99 Standard 0 2 Agricultural Levee 7.4
Bulletin 192-82 Standard 0 3 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 1
Detention Basins(s) No Bridges No
Floodplain
FIRM Designation AE Base Flood Elevation 7 feet
Levee Inspection Practices
The District’s levee superintendent conducts weekly visual inspections of the levee. When
issues arise, the District engineer is called in for further inspection and maintenance work.
Levee Segment Description Condition
Two sections totaling 600 feet
San Joaquin River Northern District Boundary does not meet HMP Standard
San Joaquin River Western District Boundary Meets HMP Standard
False River Southern District Boundary Meets HMP Standard
Fisherman’s Cut Eastern District Boundary Meets HMP Standard
Levee Maintenance
Maintenance Cost per Levee Maintenance Cost per Levee
Mile (FY 21-22) $41,106 Mile (FY 22-23) $99,667
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles.
Infrastructure Needs/Deficiencies
Ch. 11 RD 2059 Policy Consulting Associates, LLC 260
The planned infrastructure improvements focus on strengthening levee standards, seepage
remediation, and scour protection. Additionally, the District will continue its routine
maintenance of the levee system and conduct necessary repairs, as needed.
1: Most of the entirety of the levee system (98.5 percent) except for two low spots meets or
exceeds the HMP levee standard.
2: Once the entire levee system meets the HMP standard, the District has a goal of meeting
the PL84-99 standard. A new survey will need to be performed to identify elevations.
3: Currently, it is estimated that none of the miles meet the Bulletin 192-82 levee standard. A
survey is planned to be performed in FY 23/24 to confirm.
The District provides levee maintenance, drainage, upkeep of levee access roads, weed
abatement, vector/rodent control, and flood-fighting services directly and through contracts.
Additionally, flood controls and slope protection services are fully contracted.
As mentioned previously, the District participates in the Delta Ferry Authority (DFA), a Joint
Powers Authority with Webb Tract (RD 2026), to provide ferry services facilitating access to the
island. Under the DFA Joint Powers Agreement, the Districts share operational costs for ferry
services, including repairs, dry dock maintenance, inspections, and administrative and
accounting support.
The District has not identified any additional resource-sharing options.
Bradford Island sits up to 15 feet below sea level, making it vulnerable to levee failures and
breaches, which can result in significant flooding. The 2021 fire allowed for better inspection of
the landside toe berm, revealing significant seepage that had either been occurring or began
after the fire. Therefore, the District’s current focus is on controlling seepage and raising the
600 foot section of the levee that is approximately three feet lower than the surrounding
levees. Due to the fire, encroachments within the levee on the north side of the island no
longer exist, allowing the levee raise to occur.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 261
The 2023 Five-Year Plan proposes installing sheet piles or French drains to redirect seepage to
the District’s pump station and placing riprap on the waterside slope to prevent wave erosion.
Scour observed during the State’s Drought/Salinity Barrier installation may require additional
rock along False River.
The District will also continue routine maintenance of the levee system and perform necessary
repairs through the Delta Levees Subventions Program, with an estimated annual cost of
$120,000.
The District estimates funding for these projects will be available through DWR’s Subventions
and Special Projects Programs, which the District has been participating in since 2014. As
discussed in the finance section, the District also plans to propose a Proposition 218
maintenance tax to ensure the sustainable operation and maintenance of the levees and other
infrastructure.
Due to funding constraints, no project schedule has been set, and the District is prioritizing
maintenance, operations, and emergency response.
The District reports that insurance constraints on contractors, specifically related to ferry
transportation across a body of water, create significant challenges during the bidding process
for projects. These issues are compounded by limited construction hours dictated by ferry
access schedules, as well as strict weight and length limits for equipment that can be
transported on the ferry.98
In the previous 2015 MSR, the consolidation of RD 2059 with neighboring RD 2026 (Webb Tract)
was recommended due to their existing collaboration for the Delta Ferry service operations.
However, the Districts did not pursue this option. Alternatively, the District could establish a
mutual aid agreement with RD 2026 to build on the existing partnership and formalize plans for
98 Request for Information, RD 2059. November 2024.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 262
capacity and resource-sharing for reclamation services. This could help the District reduce
individual costs, avoid significant expenses associated with independently owning or leasing
equipment, and support long-term financial stability.
The 2015 MSR also recommended establishing a regional mutual aid agreement with nearby
reclamation districts to formalize capacity and resource-sharing plans for flood emergencies.
However, this recommendation has also not yet been implemented.
It is recommended that the District also explores this option to address shared challenges in the
Delta region and strengthen community resilience.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 263
11-1: RD 2059 has one landowner and an estimated population of 36 people. The District
does not anticipate any population growth or development in the foreseeable future.
11-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community
was identified as disadvantaged. According to the DWR Mapping Tool, the entirety of
the RD 2059 area is not considered a disadvantaged community.
11-3: The District is responsible for the maintenance, operation, and capital repair of the
levee and flood control system, including internal drainage on Bradford Island.
11-4: RD 2059 provides a range of services, including levee maintenance, drainage, upkeep of
levee access roads, weed abatement, vector/rodent control, and flood-fighting services
directly and through contracts. Additionally, flood controls and slope protection services
are fully contracted.
11-5: The District maintains about 7.4 miles of non-project levees, about seven miles of
associated internal drainage canals, one pump station, and other flood control
infrastructure.
11-6: Of the District’s total 7.4 miles of levees, 600 feet of levee currently fail to meet the
minimum HMP Levee Standard, which is the District’s desired level of protection. Once
all levees meet the HMP levee standard, the District aims to improve the levee system
to meet the PL 84-99 Standard.
11-7: The infrastructure improvements, as identified in the District’s Five-Year Plan, focus on
strengthening levee standards, seepage remediation, and scour protection. Additionally,
the District will continue its routine maintenance of the levee system and conduct
repairs as needed.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 264
11-8: The District reports that current service delivery is generally adequate; however,
financial constraints pose challenges in addressing maintenance needs and achieving
the desired level of protection.
11-9: RD 2059 operates on revenues from property owner assessments, levee subvention
grants, and ferry service fees.
11-10: The District historically had two assessments. The initial assessment (CB assessment)
was originally adopted as an Operation and Maintenance Assessment, and it does not
have an expiration date. The District also had a second overlay assessment (2015
assessment) which was adopted to make up for a budget shortfall for required
maintenance and pump station repairs. The 2015 Assessment expired on June 30, 2020.
The District held a Proposition 218 vote of the landowners to continue funding
operations and maintenance. The vote failed to pass, resulting a significant budget
shortfall.
11-11: The District plans to pursue another Proposition 218-compliant maintenance tax in the
near future to help fund essential operational improvements, including the
maintenance and operation of flood protection facilities, levee maintenance to HMP
standards, and the repairs of pump stations and internal drainage systems.
11-12: In FY 22-23, the District's expenses of $1,179,220 exceeded revenues of $341,810 by
$837,410, or a 244 percent deficit. In comparison, during FY 21-22, expenses of
$1,215,728 exceeded revenues of $1,101,450 by $114,728, or 10 percent. Key factors
for the revenue decline in FY 22-23 include a 93 percent decrease in fire insurance
proceeds, a 51 percent drop in assessment revenue, and a 35 percent reduction in
subvention grants.
In contrast, expenses remained stable, decreasing slightly by 3 percent in FY 22-23
compared to the previous fiscal year. Notable changes included increased levee repair
costs (up 146 percent), reduced fire-related costs (down 89 percent), and lower
engineering costs (down 76 percent).
11-13: The District’s existing tax revenues are insufficient to meet operational and
maintenance needs or achieve higher levee protection standards. After a failed
Proposition 218 vote in 2020 and the expiration of a prior assessment, the District faces
a significant funding shortfall. To address this, the District plans to pursue a new
Proposition 218-compliant assessment that would replace the existing assessment roll
and ensure long-term fiscal sustainability.
11-14: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
2059 is designated as “high priority.” This designation positions the District for future
Ch. 11 RD 2059 Policy Consulting Associates, LLC 265
funding and potentially qualifies it for levee improvement grants as they become
available. However, this is not an immediate opportunity and depends on the progress
of projects with even higher priority levels.
11-15: The District has not identified additional potential funding opportunities.
11-15: The District participates in the Delta Ferry Authority (DFA), a Joint Powers Authority
with Webb Tract (RD 2026), to provide access to the island to provide ferry services.
Operational costs for ferry services are shared equally between the two districts.
11-16: The District has not identified any additional resource-sharing options.
11-16: RD 2059 is governed by a five-member board of trustees, each serving staggered four-
year terms.
11-17: The District maintains a website that provides agenda packets and meeting minutes
for board meetings held since 2020 and follows best practices by making available
public records forms, contact information, and key reports such as annual budgets and
audits. To enhance transparency, it is recommended that the District ensure that the
updated Five-Year Plan, Compensation Report, State Controller’s Financial Transaction
Report and all meeting minutes are available on the website.
11-18: In the previous 2015 MSR, the consolidation of RD 2059 with the neighboring RD 2026
(Webb Tract) was recommended due to their existing collaboration in ferry service
operations. However, the District did not pursue this option. Alternatively, the District
could establish a mutual aid agreement with RD 2026 to build on the existing
partnership and formalize plans for capacity and resource-sharing for reclamation
services. This could help the District reduce individual costs, avoid significant expenses
related to independently owning or leasing equipment, and support long-term financial
sustainability.
11-19: The 2015 MSR also recommended establishing a regional mutual aid agreement with
nearby reclamation districts to formalize resource-sharing plans for flood emergencies.
However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges in
the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency across
districts.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 266
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 2059.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• The District's land use is primarily agricultural, with additional uses including residential
and commercial activities, such as cattle grazing, small commercial operations, and gas
extraction from gas wells on the island. Additionally, multiple electrical transmission lines
run through the District.
• The District anticipates no significant population growth or development in the near
future, indicating that demand for public services will remain stable.
• RD 2059’s key infrastructure includes approximately 7.4 miles of non-project levee, about
seven miles of associated internal drainage canals, one pump station, and other flood
control infrastructure.
• Of the District’s total 7.4 miles of levees, 600 feet of levee currently fail to meet the
minimum HMP Levee Standard, which is the District’s desired level of protection. Once all
levees meet the HMP levee standard, the District aims to improve the levee system to
meet the more stringent PL 84-99 Standard.
• The infrastructure improvements, as identified in the District’s Five-Year Plan, focus on
strengthening levee standards, seepage remediation, and scour protection. Additionally,
the District will continue its routine maintenance of the levee system and conduct repairs
as needed.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 267
• The District reports that current service delivery is generally adequate; however, financial
constraints pose challenges in addressing all maintenance needs or achieving the District’s
desired level of protection.
• There are no communities of interest within RD 2059.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 2059 sphere of influence.
It is recommended that the Commission reaffirm the current SOI for RD 2059.
Ch. 11 RD 2059 Policy Consulting Associates, LLC 268
1 2 . RECL A MAT ION DIST RIC T 2 06 5 (VEA L E
Reclamation District (RD) 2065 (Veale Tract) was formed as an independent district on April 2,
1923. RD 2065 operates under Sections 50000 et seq. of the California State Water Code to
provide drainage, irrigation, and complete reclamation of lands within the District’s boundaries.
The District’s territory includes agricultural lands (i.e., row crops, alfalfa, and irrigated pasture),
six single-family dwellings, farm worker housing, and outbuildings. Access to the District is
available via Delta Road through Knightsen from State Road 4 or from the south through Byron
Highway.
The District has four landowners and an approximate population of 12.99 There is no anticipated
population growth or development within the next five years. However, the District is
collaborating with East Contra Costa Parks on the Knightsen Wetland Restoration Project, which
involves developing the adjacent property to the west for park and floodplain restoration. This
coordination includes providing essential design feedback to support mitigation efforts and
prevent potential future impacts of the project on the District and its landowners.
The District operates and maintains non-project levees and internal drainage facilities on Veale
Tract. Additionally, the District is responsible for flood fighting and levee patrol during high-
water events. 100
99 Contra Costa LAFCO. Directory of Local Agencies, County Services Areas. Section 11: Reclamation Districts.
100 2024 Hazard Mitigation Plan, Contra Costa County, California. Reclamation District No. 2065 (Veale Tract) Annex. p.1.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 269
Figure 12-1: RD 2065 General Information
GENERAL information
Agency RD 2065 (Veale Tract)
235 E. Weber Avenue
Address Stockton, CA 95202
Principal Act California Water Code §50000 et seq.
Date Formed 1923
Population 12-14
Last SOI Update November 18, 2015
Maintenance and operations of levees, flood control and
Services Provided drainage
Employees 0
Dante J. Nomellini, Jr., Secretary and Counsel
Contact Person Email: dantejr@pacbell.net
Website https://reclamationdistrict.wixsite.com/rd2065
Board
Members Length of Term Term Expiration
Coleman Foley 4-Years 2025
Thomas E. Baldocchi, Sr. 4-Years 2027
Thomas E. Baldocchi, Jr. 4-Years 2025
RD 2065 encompasses 1,365 acres (approximately 2.1 square miles) and is located entirely
within Contra Costa County. The District lies outside the countywide urban limit line (ULL),
about two miles east of the community of Knightsen. Positioned on the western edge of the
Sacramento-San Joaquin Delta, the majority of the District is within the Secondary Zone of the
Delta, while the western portion of the District, along with the community of Knightsen falls
within the Primary Zone.
The original SOI for RD 2065 was adopted by LAFCO in 1984. In 2009, Contra Costa LAFCO
adopted a “provisional” SOI with a 12-month update requirement based on interest from the
Ch. 12 RD 2065 Policy Consulting Associates, LLC 270
District in the potential annexation of territory west of the boundary and located within the
Knightsen Town Community Services District (KTCSD). However, after exploring the option
further, neither RD 2065 nor KTCSD supported the annexation. Currently, neither supports such
annexation.
The current SOI for RD 2065 is coterminous with the District’s boundaries and was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 271
Figure 12-2: RD 2065 Boundaries and SOI
Ch. 12 RD 2065 Policy Consulting Associates, LLC 272
The District’s governing body consists of a three-member board of trustees. Board members are
landowners or legal representatives of landowners who are elected or appointed by the County
Board of Supervisors to staggered four-year terms.
The District reports that elections are rare as there are only four landowners in the District.
Vacancies on the governing Board are typically filled by appointment by the remaining Board
members pursuant to Government Code §1780, as outlined in California Water Code §50604.
Board members serve on a volunteer basis and do not receive compensation.
The Board meetings are held “as needed” at 235 East Weber Avenue, Stockton, CA 95202.
Meeting agendas are posted on the District’s website in compliance with the Brown Act101
(Government Code §§ 54954.2 and 54956), as amended by California AB 2257, which requires
agencies to make agendas available on their websites and in a publicly accessible physical
location at least 72 hours prior to regular meetings and at least 24 hours prior to special
meetings. Additionally, agendas are posted at the District Secretary’s office and are mailed or
emailed to each landowner.
Since the 2015 MSR, the District has launched a website in compliance with SB 929102, which
includes contact details and significant financial reports, including annual audits for FY 22-23
and FY 23-24, the District’s Compensation Report, and the State Controller’s Office Financial
Transaction Report. To further enhance transparency, it is recommended that the District also
make annual budgets available on its website and maintain an accessible archive of past
meeting agendas and minutes.
101 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
102 Senate Bill 929 (The Special Districts Transparency Act), passed in 2018, established that beginning January 1, 2020, every
independent special district must maintain an internet website unless the governing board adopts a resolution declaring its
determination that a hardship exists that prevents the district from establishing or maintaining a website. The Act also outlines
the minimum information required to be available on the website.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 273
RD 2065 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.103
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
103 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 274
Per the DWR Mapping Tool, a small area in the northwest portion of RD 2065 along Delta Rd
and Knightsen, is considered a disadvantaged community.
The District funds its operations and administration through property assessments and grant
funding from the State Delta Levee Subventions Program or Special Grants for specific projects.
Assessments are levied at the discretion of the Board of Trustees and are based on the total
land or acreage held by the landowners within the District, adjusted for revenues received from
the State under the Levee Subvention Program or other grants.
Annual assessments and other revenues are deposited with the Contra Costa County Treasurer
and transferred to the District’s Bank of Stockton checking account as needed to cover
operational expenses. As of June 30, 2024, the balance with the Contra Costa County Treasurer
was $0.00, while the balance in the Bank of Stockton checking account was $40,981.
For additional funding required for large-scale levee maintenance or rehabilitation projects, the
District obtains bank loans as necessary. Currently, the District has no outstanding loans.
The District operates out of a governmental fund that consists of a general fund, which finances
the general services that the District performs. State assistance, assessments, and other
revenue sources that support the District's primary operations are included in this fund. This
fund is charged with all operating costs that do not have a separate fund established.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 275
Figure 12-3: RD 2065 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Revenues FY 21-22 FY 22-23 % Change
Assessments $85,771 $170,403 99
State Subventions $27,123 $16,220 -40
Total Revenues $112,894 $186,623 65
Expenditures
General and Administrative
Audit Fees $4,100 $4,600 12
Insurance $11,636 $26,299 126
Legal and Professional Fees - $6,804 100
Total General and Administrative $15,736 $37,703 140
Maintenance and Operations
Levee Maintenance - $12,192 100
Engineering $29,184 $44,696 53
Utilities $27,158 $24,744 -9
Weed Control $9,500 $14,500 53
Total Maintenance and Operations $65,842 $96,132
Debt Service
Interest Expense $6,994 $14,336 105
Total Debt Service $6,994 $14,336 105
Total Expenditure $88,572 $148,171 67
Excess (deficiency) of Revenues Over
Expenditure Prior to Other Financing
Sources (Uses) $24,322 $38,452 58
Other Financing Sources (Uses)
Principal Payments on Warrants Payable ($30,000) ($50,00) 67
Total Other Financing Sources ($30,000) ($50,00) 67
Transfer Out (Return of Excess DWR
Advanced Funds)* - ($190,186)
Ch. 12 RD 2065 Policy Consulting Associates, LLC 276
Net Changes in Fund Balance ($5,678) ($201,734) (3,452)
Fund Balance, Beginning of Year $237,622 $231,944 -2
Fund Balance, End of Year $231,944 $30,210 -87
*In FY 22–23, the District returned an unused advanced fund of $190,186 to DWR, which had
been upfronted for a special levee project. This cash outflow reflects the significant decrease in
the District’s ending fund balance for FY 22–23.
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 22-23, the District’s total revenues (excluding other financing sources) of $186,623
exceeded total expenses of $148,171 by $38,452, or approximately 26 percent. Similarly, in FY
21-22, the District’s total revenue of $112,894 exceeded total expenditure (excluding other
financing sources) of $88,572 by $24,322, or approximately 27 percent.
As shown in Figure 12-3, total expenditures increased by 67 percent in FY 22-23, rising to
$148,171 from $88,572 in FY 21-22. This change was primarily due to a 46 percent increase in
total maintenance and operations expenses. Total revenues also increased by 65 percent over
the same period, up from $112,894 to $186,623.
The District’s fund balance at the end of FY 22-23 was $231,944, reflecting an 87 percent
decrease from the FY 21-22 ending fund balance of $30,210. This ending fund balance
represents approximately 20 percent of FY 22-23 expenses, indicating that the District has
enough reserves to cover about two months of operating costs, assuming expenses remain
relatively stable. However, this reserve level is relatively low and may not adequately cover
unexpected expenses or revenue shortfalls.
According to the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD 2065
(Veale Tract) is designated as high priority. This designation applies to levees that significantly
Ch. 12 RD 2065 Policy Consulting Associates, LLC 277
reduce flood risks to human life, protect state water supplies from saltwater intrusion, and
sustain critical ecosystems or agricultural lands vital to the Delta region.
Based on this prioritization, RD 2065 may qualify for future levee improvement grants as
funding becomes available. However, funding eligibility will depend on the progress of projects
classified as very-high priority. This is not an immediate opportunity and depends on the
progress of projects that hold even higher priority levels.
Additionally, the District has not identified any new potential funding opportunities.
The District's key infrastructure includes over five miles of non-project levees, internal drainage
channels, and a drainage pump station. Veale Tract is drained internally by a system of main
canals and laterals, leading to a sump equipped with pumps to expel excess water from the
District. Irrigation is supplied through a system of siphons through the levee and a pump.
Veale Tract’s levee runs along Rock Slough for approximately 2.55 miles on the north side of the
District, along Werner Cut for 1.8 miles on the east, and for 0.67 miles along No Name Slough
on the south. There is no back levee along the west side of Veale Tract toward Knightsen.
Levees are constructed out of earthen materials with rock rip rap on most sections of the
waterside. Ground elevations within the interior of the tract vary between four feet below sea
level to two feet above sea level. In the event of a high-water event, the entire area would be
covered by five to 11 feet of water. The entire District is currently classified by FEMA to be
within the 100-year floodplain.
The District has no recent record of flooding. However, the District’s levee system has been
subject to periodic high flow and storm events that have caused damage to the levee. A 2006
storm event caused significant erosion damage to the waterside slope of the levee at multiple
locations. After the 2006 flooding, rip rap was used to repair the waterside slope in critical
locations. There is also recurring rodent and beaver activity that damages the waterside and
landside slopes of the levee.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 278
Following the January 1980 storm that breached the levees at Holland and Webb Tracts, the
District performed an extensive dredging project to flatten the backslopes and stabilize the
levee. This dredging was performed throughout the District, except for the reach along Rock
Slough, west of the Holland Tract Bridge. As a result, the Delta Risk Management Strategy
(DRMS) study found the levee to have a low probability of failure. In addition, the existing wide
base and flat slope tend to reduce the cost of rehabilitation.
Over 99.8 percent of the District’s levee meets or exceeds the minimum Hazard Mitigation Plan
(HMP) levee standard.
RD 2065 has an updated 2023 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
In the prior Five-Year Plan, the District aimed to achieve a sustainable HMP Levee standard
within five years, utilizing the Delta Levees Special Projects Program funding for all construction
phases. The first two phases were combined, enabling the District to rehabilitate HMP levees
along a total of 19,100 linear feet across four sites. All construction was completed by
November 2019.
The District’s current goal is to meet the Bulletin 192‐82 levee standard within a five‐year
period. The District’s ability to fully reach a sustainable levee standard during this timeframe
will depend on funding availability. The 2023 Five-Year Plan estimates that with a 90 percent
cost share from DWR through the Delta Levees Program, the District will be positioned to
rehabilitate the entire levee system to meet the 192-82 standard. The District has participated
in the Subventions Program since 1996 and in the Special Projects Program in 2009.
The plan is divided into three phases. Phases 1 and 2 focus on rehabilitating the levee to a
sustainable 192-82 configuration and addressing waterside erosion. Phase 3, targeted for
completion within five years, proposes a multi-objective project that enhances waterside bank
protection and creates a low-lying habitat bench. This bench will provide freshwater marsh,
Ch. 12 RD 2065 Policy Consulting Associates, LLC 279
scrub-shrub, riparian forest, and shaded riverine aquatic habitats along the majority of the
levee.104
104 Reclamation District No. 2065. Veale Tract. 2023 Final Five-Year Plan. March 2023.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 280
Figure 12-4: RD 2065 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 5.05 Surface Elevation -4 to -2 feet
Miles of Levees by Standard Levee Miles by Type
Dry Land Levee 0.0
HMP Standard ~5.04 1 Urban Levee 0.0
PL 84-99 Standard ~1.372 Agricultural Levee 5.05
Bulletin 192-82 Standard 1.343 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 1
Detention Basins(s) No Bridges No
Floodplain
FIRM Designation AE Base Flood Elevation 7 feet
Levee Inspection Practices
Levees are inspected regularly by Trustees who are landowners. Inspections are also
conducted by the District Engineer when requested.
Levee Segment Description Condition
Meets HMP Standard, sections of
north of the District near rock slogh
Rock Slough (west of Delta Lower levee at end of Rock also meet the Bulletin 192-82
Road) Slough standard
Rock Slough (east of Delta Earthen levee with
Road) intermittent rip rap Meets HMP Standard
Meets HMP Standard, while a
couple of sections near Dredger
Earthen levee with also meet the Bulletin 192-82
Werner Dredger Cut intermittent rip rap standard
Meets HMP Standard, while some
Earthen levee at end of Dead sections also meet the Bulletin 192-
Dead Dog Slough Dog Slough 82 standard
Levee Maintenance
Ch. 12 RD 2065 Policy Consulting Associates, LLC 281
Maintenance Cost per Maintenance Cost per
Levee Mile (FY 21-22) $0 Levee Mile (FY 22-23) $2,390
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles.
Infrastructure Needs/Deficiencies
Due to minimal overbuild above the HMP minimum elevation in many areas, the District must
continuously add material to the levee crown to maintain compliance. Maintenance projects
are conducted to address any identified deficiencies and ensure adherence to HMP standards.
The District has not identified any additional infrastructure needs.
1: Over 99.8 percent of the District’s levee meets or exceeds the minimum HMP levee
standard.
2: Over 3.68 miles of levee require extensive waterside rehabilitation before those levee
sections can be considered compliant with PL 84‐99 requirements.
3: Currently, it is estimated that 1.34 miles or 26.8 percent of the Distict’s levee meet the
Bulletin 192-82 levee standard. This standard is the District’s current desired level of
protection.
The District provides both direct and contracted services for vegetation removal, weed
abatement, erosion repair, animal control, and access road upkeep. Additionally, third-party
contractors are engaged for levee maintenance, flood control, drainage, slope protection,
vector/rodent control, and levee patrol as needed.
RD 2065 collaborates with other reclamation districts to contract with firms for legal and
engineering services, which allows for shared costs and reduced expenses for commonly used
services.
The District has not identified any additional resource-sharing options.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 282
The District continues to maintain the levees to meet the minimum HMP levee standard;
however, many areas have only minimal overbuild above this standard elevation. Ongoing
material addition to the levee crown is necessary to maintain this standard. Therefore, as
priority areas are identified, the District conducts maintenance projects to address any
deficiencies found.
Overall, the District has indicated that no significant improvements are currently required
beyond maintaining the existing drainage system and levees in compliance with federal and
state standards.
The District has not identified any significant challenges in service delivery.
The 2015 MSR recommended a governance structure option for the District to establish mutual
aid agreements with nearby reclamation districts to formalize capacity and resource-sharing
plans during flood emergencies. However, this recommendation has not yet been
implemented.
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks during flood events. It is recommended
that the District explore this option to address shared challenges in the Delta region and
strengthen community resilience.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 283
12-1: RD 2065 has four landowners and an estimated population of 14 people. The District
does not anticipate any population growth or development in the foreseeable future.
12-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community
was identified as disadvantaged. According to the DWR Mapping Tool, a small area
within the northwest portion of RD 2065 along Delta Rd and Knightsen is considered a
disadvantaged community.
12-3: The District operates and maintains non-project levees and internal drainage facilities
on Veale Tract.
12-4: The District offers a range of services, including vegetation removal, weed control,
erosion repair, animal control, and maintenance of access roads, which are provided
directly and through contracts.
Additionally, third-party contractors are hired for levee maintenance, flood control,
drainage, slope protection, vector and rodent control, as well as levee patrol as
needed.
12-5: Key infrastructure includes roughly 5.05 miles of non-project levees, internal drainage
channels, and one drainage pump station.
12-6: Of the District’s total 5.05 miles of levees, 99 percent meet the minimum HMP Levee
Standard. Approximately 1.34 miles, or 26.8 percent of the District’s levees, meet the
Bulletin 192-82 levee standard, which is the District’s current desired level of
protection. Additionally, over 3.68 miles of the District levee require extensive
waterside rehabilitation to be compliant with the PL 84‐99 levee standard.
12-7: Due to minimal overbuild above the HMP minimum elevation in many areas, the
District must continuously add material to the levee crown to maintain compliance.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 284
Maintenance projects are conducted to address any identified deficiencies and ensure
adherence to HMP standards.
12-8: According to the updated 2023 Five-Year Plan, the District plans to rehabilitate the
entire levee system to meet the 192-82 standard, with an anticipated 90 percent cost
share from DWR.
12-9: The District reports that current service delivery is overall adequate and that no
significant improvements are required beyond maintaining the existing drainage
system and levees in compliance with federal and state standards.
12-10: RD 2065 operates on revenues from property assessments and grant funding from the
State Delta Levee Subventions Program or Special Grants for specific projects.
12-11: In FY 22-23, the District’s total revenues (excluding other financing sources) of
$186,623 exceeded total expenses of $148,171 by $38,452, or approximately 26
percent. Similarly, in FY 21-22, the District’s total revenue of $112,894 exceeded total
expenditure (excluding other financing sources) of $88,572 by $24,322, or
approximately 27 percent.
12-12: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
2065 is designated as “high priority”, which positions the District for future funding,
potentially qualifying it for levee improvement grants as they become available.
However, this is not an immediate opportunity and depends on the progress of
projects with even higher priority levels.
12-13: The District has not identified additional potential funding opportunities.
12-14: RD 2065 shares engineering and legal services with other reclamation districts,
reducing expenses through cost-sharing for commonly used services.
12-15: The District has not identified any additional resource-sharing options.
12-16: RD 2065 is governed by a three-member board of trustees, each serving a staggered
four-year term.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 285
12-17: In the previous 2015 MSR, establishing a regional mutual aid agreement with nearby
reclamation districts to formalize resource-sharing plans for emergencies was
recommended. However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges in
the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency across
districts.
12-18: Since the previous MSR, the District has launched its own website, which makes
contact details and financial reports, including annual audits for FY 22-23 and FY 23-24,
District’s Compensation Report, and the State Controller’s Office Financial Transaction
Report available to the public. To further enhance transparency, it is recommended
that the District also make annual budgets available on its website and maintain an
accessible archive of past meeting agendas and minutes.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 286
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 2065.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• The District's land use comprises agricultural lands (i.e., row crops, alfalfa, and irrigated
pasture), six single-family dwellings, farmworker housing, and outbuildings.
• There are no anticipated changes in land use in the foreseeable future.
• The District anticipates no significant population growth or development in the near
future, indicating that demand for public services will remain stable.
• RD 2065’s key infrastructure includes approximately 5.1 miles of non-project levees,
internal drainage channels, and one drainage pump station.
• Of the District’s total 5.1 miles of levees, 99 percent meet the minimum HMP levee
standard. While approximately 1.34 miles or 26.8 percent of the District’s levees meet the
Bulletin 192-82 levee standard, which is the District’s current desired level of protection.
Additionally, over 3.68 miles of the District levee require extensive waterside
rehabilitation to be compliant with the PL 84‐99 levee standard.
• Due to minimal overbuild above the HMP minimum elevation in many areas, the District
must continuously add material to the levee crown to maintain compliance. Maintenance
projects are conducted to address any identified deficiencies and ensure that the District’s
levee system continues to meet the HMP standard.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 287
• According to the updated 2023 Five-Year Plan, the District plans to rehabilitate the entire
levee system to meet the 192-82 standard.
• The District reports that current service delivery is overall adequate and that no significant
improvements are currently required beyond maintaining the existing drainage system and
levees in compliance with federal and state standards.
• The District is collaborating with East Contra Costa Parks on the Knightsen Wetland
Restoration Project, which involves developing the adjacent property to the west for park
and floodplain restoration. This coordination includes providing essential design feedback
to support mitigation efforts to prevent potential future impacts on the District and its
landowners.
• According to the DWR Mapping Tool, a small area within the northwest portion of RD 2065
along Delta Rd and Knightsen is considered a disadvantaged community.
It is recommended that the Commission reaffirm the current SOI for RD 2065.
Ch. 12 RD 2065 Policy Consulting Associates, LLC 288
1 3 .
Reclamation District (RD) 2090 (Quimby Island) is a Delta Island that is accessible only by boat.
RD 2090 was formed on March 21, 1918, as an independent special district under Sections
50300 et seq of the California State Water Code to provide levee maintenance and internal
drainage services within the District’s boundaries.
Ellis Island Farms, Inc., an S corporation105, is the sole owner of Quimby Island. In 2015, the
corporation donated an 80 percent interest in Ellis Island Farms, Inc., which includes primarily
the 789-acre unimproved Quimby Island, to the California Waterfowl Association (CWA) for a
wetland conservation easement. CWA is a 501(c)(3) organization dedicated to enhancing
California’s waterfowl populations and wetlands and promoting hunter-conservationist
communities. The donation also includes the corporation's other assets, consisting of
investment securities and various real properties that support operations, as well as a $2.2
million quasi-endowment for maintenance costs.
As part of the California Waterfowl's Hunt Program, Quimby Island is a resource for
conservation and recreational activities, including organized hunting events. The island was
enrolled in a federal wetland conservation easement program in 2012 and was restored to
managed wetlands by California Waterfowl staff.
Quimby Island's habitats consist of seasonal and semi-permanent wetlands, riparian areas, and
grasslands. The island’s fertile peat soils create ideal growing conditions for wetland vegetation,
supporting unique plant communities not commonly found elsewhere in the valley, including
dense stands of smartweed and watergrass along with extensive willow thickets that attract
large numbers of waterfowl.106
105 An S corporation elects to be taxed as a pass-through entity. Income, losses, deductions, and credits flow to the
shareholders, partners, or members.
106 Quimby Island Hunter Handbook. 2021-2022 Waterfowl Season. California Waterfowl. p.3.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 289
The island relies on its seven miles of non-project levees for flood protection, which maintains
the land's usability for waterfowl habitat, recreational activities, and other purposes. The levees
are not within the federal easement and are managed by RD 2090. The District is responsible
for improving and maintaining the levees and operating the flood control system, including
pumps, canals, and ditches.
Originally farmed for corn, the current land use on the island is wildlife conservation. There is
one property in the District that the owner uses for hunting; however, there are no permanent
residents. No population growth or planned development is anticipated in the foreseeable
future.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 290
Figure 13-1: RD 2090 General Information
GENERAL information
Agency RD 2090 (Quimby Island)
1346 Blue Oaks Blvd. Ste. 100
Address Roseville, CA 95678
Principal Act California Water Code §50300 et seq.
Date Formed 1918
Population 0 resident; 1 landowner
Last SOI Update Novemeber 18, 2015
Improve and maintain levees; maintain and operate flood
Services Provided control system including pumps, canals and ditches
Employees 1; Part-time Superintendent
Jake Messerli, Chairman
Contact Person Email: jmesserli@calwaterfowl.org
Website https://calwaterfowl.org/reclamation-district-2090
Board Members Length of Term Term Expiration
Jake Messerli, Chairman 4-Years 2027
Robert Eddings, Secretary 4-Years 2028
Lawerence J. Watty, Trustee 4-Years 2027
RD 2090 encompasses 789 acres, approximately 1.2 square miles, and is located in the
easternmost corner of Contra Costa County between Mandeville Island, Frank's Tract, and
Holland Tract in the heart of the California Delta. The District is within the Primary Zone of the
Sacramento-San Joaquin Delta and is outside the countywide urban limit line (ULL).
The current SOI for RD 2090 is coterminous with the District’s boundaries. The SOI was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 291
Figure 13-2: RD 2090 Boundaries and SOI
Ch. 13 RD 2090 Policy Consulting Associates, LLC 292
Ch. 13 RD 2090 Policy Consulting Associates, LLC 293
According to Article I, Sections 1 and 2 of the District’s bylaws, RD 2090 is governed by a three-
member board of trustees that serve a staggered four-year term. The Board meets on an as-
needed basis. 107
All board members are associated with the landowner as shareholders. Two board members
are CWA staff, 80 percent shareholders of Ellis Island Farms, LLC, while one is a representative
of a trust that owns 20 percent of the corporation. Board members are nominated by the
landowner and approved by the Board of Supervisors.
The Brown Act108 (Government Code §§ 54954.2 and 54956), as amended by California AB
2257, requires agencies to make agendas available on their websites and in a publicly accessible
physical location at least 72 hours prior to regular meetings and at least 24 hours prior to
special meetings. The District does not maintain its own website; however, general information,
as well as board meeting agendas and minutes from 2014 to 2019, is available on multiple
pages of the California Waterfowl’s website. To further enhance transparency, it is
recommended that the District make up-to-date agendas and meeting minutes available online.
Furthermore, to ensure a clear separation of RD 2090 and the CWA, it is recommended that the
District establish a separate website that provides relevant documents such as by-laws, policies,
and Five-Year Plans, as well as significant financial reports, including the District’s
Compensation Report, the State Controller’s Office Financial Transaction Report, annual
budgets, and audits.
The District has not prepared annual audits in recent years due to accountant turnover.
Government Code Section 26909 (a) mandates that all special districts must have an annual
audit conducted by a certified public accountant or a public accountant. Furthermore,
Government Code §26909 requires special districts to submit annual audits to the State
107 Bylaws of Quimby Island Reclamation District No. 2090. February 1, 1972.
108 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 294
Controller, the County Auditor, and the LAFCO of the county in which the special district is
located within 12 months after the end of the fiscal year.
Under California Government Code §26909(c)(1), special districts with annual revenues under
$150,000 may opt for a financial review or agreed-upon procedures instead of a full annual
audit, provided they receive unanimous approval from both the district’s governing board and
the County’s board of supervisors. This option is available if all transactions are processed
through the county’s financial system, and the district must cover any costs incurred by the
county auditor for the procedures using unencumbered funds.
However, California Government Code §26909(c)(2) requires special districts to conduct a full
audit at least once every five years, even if they use a financial review or other agreed-upon
procedures instead of an annual audit.
According to RD 2090's most recent budget, the District's annual revenue is under $150,000,
which allows it to utilize the option outlined in California Government Code §26909(c)(1). In
January 2025, the Board of Supervisors approved the District's request to submit a five-year
audit in lieu of the required annual audit. The District reports that an audit is currently in
progress.
RD 2090 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 295
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.109
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community is
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 2090 is not considered a disadvantaged
community.
As mentioned, Ellis Island Farms, Inc. is the sole owner of the District property and provides the
funding for the District operation through assessment on an as-needed basis. The District also
receives funding from the Delta Levee Subvention Program.
109 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 296
The District has an annual budget of $25,000. According to the most recent budget for FY 24-25,
the following three expenses account for 89 percent of the District's total budget, as illustrated
in Figure 13-3:
• Total gross salary for the sole employee, the Superintendent: $10,000;
• Outside labor subcontract expenses for equipment rental from Ellis Island Farms, Inc.
(based on approved Caltrans annual equipment rental rates and labor surcharges):
$6,250;
• Property and liability insurance costs: $6,000.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 297
Figure 13-3: RD 2090 FY 24-25 Budget
Annual Budget
Revenue FY 24-25
Property Assessments $15,000
Reimbursements $10,000
Total Revenue $25,000
Expense
Gross Salaries $10,000
Outside Labor- Subcontracts $6,250
Payroll Taxes $1,000
CA P/R Taxes $150
Ins. Health & WC $450
Insurance – Property & Liability $6,000
Property Maintenance $500
Fees, Dues & Subscriptions $150
Miscellaneous $500
Total Disbursements $25,000
Net Income (Loss) $0
According to the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD 2090
(Quimby Island) is designated as other priority. The DWR funds levee projects in very-high
priority islands or tracts before approving projects in high-priority or other priority islands or
tracts. Therefore, projects in the other priority category, such as those in RD 2090, receive
funding once projects designated as very high or high priority have been fully funded.
Based on this funding prioritization, RD 2090 may become eligible for future levee
improvement grants as funds become available. However, this is not an immediate funding
opportunity.
The District did not identify any additional potential funding opportunities.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 298
RD 2090 maintains approximately 7.02 miles of non-project levees that surround the District,
two pump stations, and an internal drainage system. The District performs routine erosion
repairs, all-weather road repairs, debris removal, minor core trenching, vegetation control,
rodent control, ditch cleaning, and pump repair and maintenance.
In recent years, no significant levee breaches or failures have been recorded within the District.
Over the past 30 years, the District has made incremental improvements to the entire levee
system to ensure it meets the Hazard Mitigation Plan (HMP) criteria and the PL 84-99 standard.
These improvements have included the addition of a stability berm, the flattening of the
landside levee slope, and the widening of the levee crown. These enhancements have allowed
the foundational peat soils to settle properly, ensuring that the levee's geometry continues to
meet the intended standards over time.
A notable levee project undertaken by the District in recent years occurred in 2017, which
involved repairs to grant line canal erosion at various sites throughout the District.
Furthermore, the District Superintendent routinely monitors and inspects the levee system for
seepage and sluffing. During high-water events or severe weather, the inspection frequency is
increased to meet the demand.
RD 2090 has an updated 2023 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
Three priority projects were identified in the 2009 Five-Year Plan, including achieving
compliance with the minimum HMP and PL 84-99 levee standard for the entire levee system,
and adding supplementary quarry stone riprap to any portions of the waterside slope of the
levee that require additional rock slope protection.
Since then, the District has undertaken numerous smaller maintenance projects to address
waterside levee erosion and rock slope protection, as allowed pursuant to California
Ch. 13 RD 2090 Policy Consulting Associates, LLC 299
Department of Fish and Wildlife (CDFW) Routine Maintenance Agreement conditions. The
primary funding for this work was through the Delta Levees Maintenance Subventions Program.
However, no progress has been made on either the HMP or PL 84-99 levee projects outlined in
the 2009 Five-Year Plan, primarily due to insufficient funding.
Currently, roughly 97 percent of the District's levee system meets the HMP levee standard,
while 78.1 percent meets the PL 84-99 levee standard. According to the Five-Year Plan, the
District's desired level of protection is to meet the Bulletin 192‐82 levee standard, which
approximately 62 percent of the levee system meets. The District plans to meet this level of
protection first by repairing waterside erosion sites by supplementing existing rock slope
protection consisting of riprap along the District's levee as necessary to prevent further erosion
caused by wind-driven waves, wakes from recreational boat traffic as well as high water flows
from floods, tides, and State and Federal water conveyance. The Bulletin 192-82 Levee Project
will likely be divided into several phases or projects, depending on the funding available.
The District's current priority is to ensure the maintenance of the existing levee by adding
quarry stone riprap above the existing riprap to any portions of the levee's waterside slope that
require additional rock slope protection to prevent erosion.
The Delta Levees Program, specifically the Delta Levee Maintenance Subventions and Special
Projects program, is the sole funding source currently identified for these projects.110 The
District has been a participant in the Delta Levees Program for over 30 years.
110 Reclamation District No. 2090, Quimby Island. Five Year Plan. March 7, 2023. p.18.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 300
Figure 13-4: RD 2090 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
-5 to -11 feet
(average elevation
Total Levee Miles 7.02 Surface Elevation of -8 ft.)
Miles of Levees by Standard Levee Miles by Type
Dry Land Levee 0.0
HMP Standard 6.82 1 Urban Levee 0.0
PL 84-99 Standard 5.482 Agricultural Levee 7.02
Bulletin 192-82 Standard 4.35 3 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 2
Detention Basins(s) No Bridges No
Floodplain
FIRM Designation AE Base Flood Elevation 9.8 feet
Levee Inspection Practices
The District Superintendent regularly monitors and inspects the levee system. During high-
w ater or severe weather events, the frequency of inspections is increased to meet the demand.
Levee Segment Description Condition
>99 percent of the levee
Serpentine earthen levee along segment meet HMP
Old River north, east and south standard
>99 percent of the levee
Earthen levee along west side of segment meet HMP
Sheep Slough island standard
Levee Maintenance
Maintenance Cost per Levee Mile (FY 24-25) $2,314
The maintenance cost per levee mile is determined by calculating the estimated annual
expenses for the gross salaries of the District's Superintendent, who oversees levee inspection
and maintenance. This amount also includes rental expenses for weed control and proper
drainage maintenance equipment to protect the levee. The total is then divided by the overall
number of levee miles.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 301
Infrastructure Needs/Deficiencies
No infrastructure needs have been identified; however, the District will prioritize levee
protection by adding rip rap where needed to protect waterside slope.
1: Most of the District’s levee system (97.2 percent) meets or exceeds the HMP levee standard.
2: 78.1 percent of the levee system meets the minimum PL84-99 standard.
3: Currently, 62 percent of the levee system meets the Bulletin 192-82 levee standard. The
District aims to meet this standard if funding becomes available.
RD 2090 reports that it previously hired an engineer to prepare the District’s Five–Year Plan and
conduct annual levee inspections. However, there have been no major projects or emergencies
that have required additional contracted services.
Routine activities, such as levee maintenance, levee road upkeep, weed abatement, vector and
rodent control, levee patrol, and slope protection, are performed on a small scale by the
District’s superintendent.
In the future, the District plans to hire contractors to perform work as needed.
The District does not own any assets and instead relies on Ellis Island Farms Inc. for its
equipment. Additionally, the District Superintendent is an employee of the corporation. To
maintain a clear separation of duties and functions between the two entities, the District has its
own workers’ compensation policy, and the Superintendent records time separately for work
performed for the District.
The District also collaborates with Holland Tract (RD 2025), located southwest of Quimby Island,
to access the island, as it uses barges for transporting equipment.
The District has not identified any additional resource-sharing opportunities.
The District has not identified any immediate infrastructure needs.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 302
The District has not identified any significant challenges in service delivery.
The 2015 MSR recommended a governance structure option for the District to establish mutual
aid agreements with nearby reclamation districts to formalize capacity and resource-sharing
plans during flood emergencies. However, this recommendation has not yet been
implemented.
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks during flood events. It is recommended
that the District explore this option to address shared challenges in the Delta region and
strengthen community resilience.
Furthermore, due to the overlapping nature of the District, Ellis Farm Inc., and the CWA, it is
essential to maintain clear distinctions in accounting, finances, and operations among these
entities. As previously noted, establishing a dedicated website for the District that offers
relevant information, such as bylaws, policies, planning documents, and important financial
reports, can improve transparency regarding the functions and operations of these closely
linked entities.
Another option identified is for the CWA to fully assume the RD functions as the 80 percent
owner of the island. However, it is important to consider the distinct legislative framework that
governs a nonprofit organization, such as the CWA, compared to a reclamation district. For
example, reclamation districts can levy assessments on a per-parcel basis depending on the
reclamation needs of each parcel, as well as charge fees for individual services. In contrast,
nonprofits do not have the statutory authority to levy assessments or impose fees.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 303
14-1: RD 2090 has no permanent residents. The District does not anticipate any population
growth or development in the foreseeable future.
14-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community
is identified as disadvantaged. According to the DWR Mapping Tool, the entirety of the
RD 2090 area is not considered a disadvantaged community.
14-3: RD 2090 is responsible for improving and maintaining the levees and operating the
flood control system, including pumps, canals, and ditches.
Routine activities, such as levee maintenance, levee road upkeep, weed abatement,
vector and rodent control, levee patrol, and slope protection, are performed on a small
scale by the District’s superintendent.
14-4: The District’s key infrastructure includes approximately 7.02 miles of non-project levees
that surround the District, two pump stations, and an internal drainage system.
14-5: Of the District’s total 7.02 miles of levees, 97.2 percent (6.82 miles) meets or exceeds
the HMP levee standard, 78.1 percent (5.48 miles) of the levee system meets the
minimum PL84-99 standard, and 62 percent (4.35 miles) of the levee system meets the
Bulletin 192-82 levee standard.
14-6: The District aims to meet the Bulletin 192-82 Levee Standard by first addressing
waterside erosion. This will be achieved by reinforcing existing rock slope protection
with additional riprap along the levee as needed. These measures will help prevent
further erosion caused by wind-driven waves, recreational boat wakes, high water flows
from floods and tides, and State and Federal water conveyance.
The Delta Levees Program, specifically the Delta Levee Maintenance Subventions and
Special Projects program, is the sole identified funding source for these projects.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 304
14-7: The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
14-8: The sole landowner (Ellis Island Farms, Inc.) within the District is the primary funder of
the District’s operations through assessments. The District also receives funding from
the Delta Levee Subvention Program.
14-9: According to the District’s most recent FY 24-25 budget, gross salaries, outside-labor
subcontracts for equipment rental, and property and liability insurance expenses
account for 89 percent of the total budget.
14-10: Due to accounting staff turnover, the District has not completed its annual audits as
required by Government Code §26909. Recently, the District received approval from
the County’s Board of Supervisors to conduct an audit covering the last five years, as
the District’s annual revenues qualify under Government Code §26909(c)(1), being less
than $150,000. The District reports that the audit is currently in progress.
In addition to the full audit every five years, it is recommended that the District
perform annual financial reviews to ensure compliance with Government Code
§26909(c)(1).
14-11: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
2090 is designated as “other priority”, meaning the District may be eligible for future
funding, depending on the progress of projects with higher priority designations.
Therefore, this is not an immediate funding opportunity.
14-12: The District has not identified any potential funding opportunities.
14-13: RD 2090 relies on Ellis Island Farms Inc. for its equipment for weed control and proper
drainage maintenance. The District Superintendent is also an employee of the
corporation.
Additionally, the District collaborates with Holland Tract (RD 2025), which is located
southwest of Quimby Island, to access the island, as it uses barges to transport
equipment.
14-14: The District has not identified additional resource-sharing options.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 305
14-15: RD 2090 is governed by a three-member board of trustees, each serving a staggered
four-year term.
14-16: In the previous 2015 MSR, establishing a regional mutual aid agreement with nearby
reclamation districts to formalize resource-sharing plans for emergencies was
recommended. However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges in
the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency across
districts.
14-17: Furthermore, due to the overlapping nature of the District, Ellis Farm Inc., and the
CWA, it is essential to maintain clear distinctions in accounting, finances, and
operations among these entities. For example, launching a dedicated website for the
District that includes information specific to RD 2090—such as bylaws, policies,
planning documents, and significant financial reports—can enhance transparency in
the functions and operations of these closely linked entities.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 306
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 2090.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• The current land use on the island is wildlife conservation. There is also one property in the
District that the owner uses for hunting.
• There are no anticipated changes in land use in the foreseeable future
• RD 2090 has no permanent residents and anticipates no population growth or
development in the near future, indicating that demand for public services will remain
stable.
• RD 2090’s key infrastructure includes approximately 7.02 miles of non-project levees that
surround the District, two pump stations, and an internal drainage system.
• Of the District’s total 7.02 miles of levees— 97.2 percent (6.82 miles) meets or exceeds the
HMP Levee Standard, 78.1 percent (5.48 miles) of the levee system meets the minimum
PL84-99 standard, and 62 percent (4.35 miles) of the levee system meets the Bulletin 192-
82 levee standard.
• The District aims to meet the Bulletin 192-82 Levee Standard by first addressing waterside
erosion. This will be achieved by reinforcing existing rock slope protection with additional
riprap along the levee as needed. These measures will help prevent further erosion caused
by wind-driven waves, recreational boat wakes, high water flows from floods and tides,
and State and Federal water conveyance.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 307
• The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
• There are no communities of interest within RD 2090.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 2090 sphere of influence.
It is recommended that the Commission reaffirm the current SOI for RD 2090.
Ch. 13 RD 2090 Policy Consulting Associates, LLC 308
1 4 . RECL A MAT ION DIST RIC T 2 11 7 (CON EY
Reclamation District (RD) 2117 (Coney Island) was established on August 10, 1983, as an
independent special district to improve and maintain levees, drainage, and irrigation systems
within the District’s boundaries. RD 2117 operates under Section 50000 of the California State
Water Code to provide services within the District’s boundaries.
RD 2117 is a Delta island in the southeastern part of Contra Costa County. The District has one
landowner and approximately four111 to six residents. Land use within the District comprises
agricultural production supported by ancillary farm buildings, a primary residence, and a
caretaker residence. There is no anticipated population growth or development in the
foreseeable future.
111 Contra Costa LAFCO, County Services Areas, Directory of Local Agencies. Section 11: Reclamation Districts. May 2024.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 309
Figure 14-1: RD 2117 General Information
GENERAL information
Agency RD 2117 (Coney Island)
235 East Weber Avenue
Address Stockton CA 95202
Principal Act California Water Code §50000 et seq.
Date Formed 1983
Population 4-6
Last SOI Update Novemeber 18, 2015
Maintenance and operations of levees, flood control and
Services Provided drainage
Employees 1; Secretary and Attorney
Dante J. Nomellini, Sr., General Manager
Contact Person Email: ngmplcs@pacbell.net
Website https://reclamationdistrict.wixsite.com/rd2117
Board Members Length of Term Term Expiration
Joyce Speckman 4-Years 2027
Sandra Speckman Kiefer 4-Years 2025
Kent L. Kiefer 4-Years 2027
RD 2117 covers 935 acres (approximately 1.5 square miles) and is entirely within Contra Costa
County. The District is located approximately midway between the town of Byron and the City
of Tracy, bordered by to the north, east, and south and West Canal to the west.
The District lies within the Primary Zone of the Sacramento-San Joaquin Delta and is outside the
countywide urban limit line (ULL).
The current SOI for RD 2117 is coterminous with the District’s boundaries. The SOI was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 310
Ch. 14 RD 2117 Policy Consulting Associates, LLC 311
Figure 14-2: RD 2117 Boundaries and SOI
Ch. 14 RD 2117 Policy Consulting Associates, LLC 312
RD 2117 is governed by a three-member board of trustees, each serving a staggered four-year
term. The Board meets at least once a year and schedules additional meetings as needed
throughout the year. Meetings are held in the District Secretary's conference room at 235 East
Weber Avenue, Stockton, CA 95202. The District also offers residents the option to participate
in meetings via conference call.
Meeting agendas are publicly posted on the window of the District Secretary's office and on the
District’s website, in compliance with the Brown Act112 (Government Code §§ 54954.2 and
54956), as amended by California AB 2257, which requires agencies to make agendas available
on their websites and in a publicly accessible physical location at least 72 hours prior to regular
meetings and at least 24 hours prior to special meetings. Additionally, agenda packets and
minutes for meetings held from 2021-2023 are accessible on the District’s website.
Since the 2015 MSR, the District has launched a website in compliance with SB 929113, that
offers access to various documents, including the District’s Compensation Report and the State
Controller’s Office Financial Transaction Report.
To further enhance transparency, it is recommended that the District also provide up-to-date
audits, budgets, agenda packets, and minutes on the website.
RD 2117 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
112 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
113 Senate Bill 929 (The Special Districts Transparency Act), passed in 2018, established that beginning January 1, 2020, every
independent special district must maintain an internet website unless the governing board adopts a resolution declaring its
determination that a hardship exists that prevents the district from establishing or maintaining a website. The Act also outlines
the minimum information required to be available on the website.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 313
LAFCO is required to evaluate disadvantaged unincorporated communities as part of this
service review, including the location and characteristics of any such communities. The intent
and history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.114
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 2117 is not considered a disadvantaged
community.
114 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 314
The District operates a governmental fund consisting of a general fund, which accounts for the
resources that finance the general services provided by the District. This fund is financed by
assessments, state assistance, and other revenue sources. Assessments are levied at the
discretion of the Board of Trustees. The District consists of a single landowner whose share
represents 100 percent of the total assessed valuation of District land.
State assistance includes participation in the Delta Levee Maintenance Subventions Program.
Furthermore, the District entered into a project funding agreement with the Department of
Water Resources to prepare its updated Five-Year Plan.
Excess funds on hand are deposited with the Contra County Treasurer. As of FY 22-23, the
District reports a cash balance of $42,949.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 315
Figure 14-3: RD 2117 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Receipts FY 21-22 FY 22-23 % Change
State Assistance $69,772 $37,717 -46
Property Assessments - $37,000 100
Reimbursements - $1,815 100
Total Receipts $69,772 $76,532 10
Disbursements
Levee Repairs and Maintenance $14,334 $45,793 219
Rodent Control - $24,999 100
Engineering $16,039 $7,513 -53
Professional Fees $1,539 $6,086 295
Payroll Expenses - $2,801 100
Insurance - $211 100
Miscellaneous - $18 100
Total Disbursements $31,912 $87,421 174
Excess (deficiency) of Receipts Over
Disbursements Prior to Other Financing
Sources (Uses) $37,860 ($10,889)
Net Position, Beginning of Year $10,258 $53,838 425
Prior Year Adjustment $5,720 -
Net Position, End of Year $53,838 $42,949 -11
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 21-22, the District’s total revenue of $69,772 exceeded total expenses of $31,912 by
$37,860 or approximately 118.6 percent. In contrast, in FY 22-23, total expenses of $87,421
exceeded total revenue of $76,532 by $10,889, or approximately 14 percent.
As shown in Figure 14-3, total expenses increased by 174 percent, primarily due to the addition
of payroll, insurance, miscellaneous, and rodent control expenses that were not incurred in FY
Ch. 14 RD 2117 Policy Consulting Associates, LLC 316
21-22. Professional fees and levee repairs and maintenance also rose significantly during this
period, increasing by 295 percent and 219 percent, respectively.
Total revenue in FY 22-23 increased to $76,532, or by roughly 10 percent, compared to $69,772
in FY 21-22. This growth was primarily driven by income from property assessments and
reimbursements, which were not present in the previous fiscal year.
The District is owned by one landowner, and the costs of funding operations and repairs are
assessed to the owner minus revenues received from the State under the Levee Subvention
Program or other grants. This funding structure could explain why assessments fluctuate from
one fiscal year to another.
The District’s net position at the end of FY 22-23 was $53,838, reflecting an 11 percent decline
from the FY 21-22’s net position of $42,949. The District’s FY 22-23 net position represents 49
percent of operating expenses in the same period, indicating that the District has sufficient
reserves to cover approximately six years and ten months of operating costs, assuming
expenses remain relatively stable.
It is important to note that while increases and decreases in net position (the amount by which
an organization’s total assets exceed its total liabilities) are useful indicators of whether the
District’s financial position is improving or deteriorating, it is not a direct measure of
immediately available resources. Unlike fund balances, net position may include capital assets
such as infrastructure and long-term liabilities, which are not immediately available.
According to the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD 2117
(Coney Island) is designated as an "other priority." The DWR funds levee projects in very-high
priority islands or tracts before approving projects in high-priority or other priority islands or
tracts. Therefore, projects in the "other priority" category, such as those in RD 2117, receive
funding once projects designated as very high or high priority have been fully funded.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 317
Based on this funding prioritization, RD 2117 may become eligible for future levee
improvement grants as funds become available. However, this is not an immediate funding
opportunity.
The District did not identify any additional potential funding opportunities.
RD 2117’s key infrastructure includes approximately 5.48 miles of non-project levee that
surrounds the District, one pump station, and a bridge. Ground elevations within the interior of
the island average eight feet below sea level. In the event of a high-water event, the entire area
would be covered by up to 16 feet of water.
The District's levee system protects prime farmland, residential and non-residential structures,
and an overhead power transmission line owned by the Western Area Power Administration
(WAPA), which has seven towers within the District.115
Although there have not been any significant levee breaches or failures in recent history, the
District conducts continuous routine maintenance and repair activities on the levee, including
erosion repairs, all-weather road repairs, debris removal, minor core trenching, vegetation
control, rodent control, ditch cleaning, and pump repair and maintenance. A notable major
levee project that the District has undertaken in recent years was in FY 17-18, which included
erosion repairs on waterside slope at several locations on the District's levee, widening of
landside levee stations, and placement of aggregate base on all-weather roads.
The District does not have a formal inspection procedure or maintain written inspection
reports. However, the Board of Trustees conducts levee inspections on an ongoing basis.
Additionally, the District engineer performs inspections as part of the levee subvention
application process and related projects.
115 Reclamation District No. 2117, Coney Island, Five-Year Plan. March 17, 2023. p.25.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 318
RD 2117 has an updated 2023 Five-Year Plan that outlines the progress made since the previous
plan, details the current and desired levels of flood protection, and includes the District’s plan
for achieving its protection goals.
The previous 2009 Five-Year Plan identified three projects, including adding supplementary
quarry stone riprap to any portions of the levee’s waterside slope requiring additional rock
slope protection (Rock Slope Protection Project) and achieving compliance with the PL 84-99
and HMP levee standards.
Since 2009, the District has completed numerous smaller maintenance projects to address
waterside levee erosion and rock slope protection. However, no work has occurred with the
HMP Levee Project or the PL 84-99 Levee Project, largely due to the lack of affordable funding.
Currently, the District’s desired level of protection is to meet the DWR Bulletin 192-82 levee
Standard while also addressing any specific geotechnical seepage and/or stability issues as
needed.
The District’s priority projects include safeguarding the existing levee by adding quarry stone
riprap above the current riprap to any portion of the waterside slope requiring additional rock
slope protection. This project aims to prevent erosion and reduce future repair needs.
According to the Five-Year Plan, the total cost of this project is $2,813,000.
Following the completion of the rock slope protection project, the District plans to raise
portions of the levee below the Bulletin 192-82 Standard to six inches above that standard. This
adjustment is intended to accommodate future levee raises in response to climate change and
sea level rise. Based on available funding, the project is expected to be divided into several
phases, with the total estimated cost of approximately $3,884,000.
The Delta Levees Program, in which the District has participated for over 30 years, is currently
the only identified funding source for these projects. Specifically, it anticipates utilizing the
Ch. 14 RD 2117 Policy Consulting Associates, LLC 319
Delta Levees Subvention Program for the rock slope protection project and the Delta Levees
Special Projects for the Bulletin 192-82 levee project. 116
The District’s updated 2023 Five-Year Plan is readily available on its website.
116 Reclamation District No. 2117, Coney Island, Five-Year Plan. March 17, 2023. p.17-20.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 320
Figure 14-4: RD 2117 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 5.48 Surface Elevation ~9 feet
Miles of Levees by Standard Levee Miles by Type
Dry Land Levee 0.0
HMP Standard ~5.48 1 Urban Levee 0.0
PL 84-99 Standard ~4.11 2 Agricultural Levee 5.48
Bulletin 192-82 Standard 2.973 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) 1
Detention Basins(s) No Bridges 1
Floodplain
FIRM Designation AE Base Flood Elevation 8 feet
Levee Inspection Practices
RD 2117 does not have a formal levee inspection procedure. Instead, the District Trustees
regularly monitor the levees. Additionally, the District Engineer performs periodic inspections
as part of the levee subvention application process and related projects.
Levee Segment Description Condition
Along the north, east, and
Old River south side of island Meets the HMP Standard
90 ft does not meet the HMP
West Canal Along the west side of island Standard
Levee Maintenance
Maintenance Cost per Levee Maintenance Cost per
Mile (FY 21-22) $2,615 Levee Mile (FY 22-23) $8,356
Maintenance Cost per Levee Mile is equal to the expenditure amount on levee maintenance
and repairs in the Fiscal Years divided by the total number of levee miles.
Infrastructure Needs/Deficiencies
The District has not identified any immediate infrastructure needs. However, the District aims
to achieve the Bulletin 192-82 Levee Standard while also addressing any specific geotechnical
seepage and/or stability issues as required.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 321
1: 0.02 miles or 0.3% of the District’s levee system currently does not meet the minimum HMP
Levee Standard.
2: Approximately 4.11 miles or 75 percent of the District’s levee system meets the PL 84-99.
3: 2.97 miles or 54.2% of the District’s levee system meets the Bulletin 192-82 Levee Standard.
This is the District’s desired level of protection.
RD 2117 contracts for levee maintenance, flood control, drainage, access road upkeep, weed
abatement, slope protection, and rodent/vector control services. Additionally, flood fighting
and levee patrol services are delivered both directly by the District and through contracts.
Furthermore, the District contracts for legal and engineering services.
RD 2117 participates in facility and resource-sharing practices with Coney Island Farms,
specifically for equipment and staffing support. The District reports that opportunities for
additional facility sharing are limited and that no further resource-sharing opportunities have
been identified at this time.
The District has not identified any additional resource-sharing opportunities.
The District has not identified any immediate infrastructure needs.
The District reports that the overall current service delivery is adequate; however, more
stringent and increasing regulations are expected to raise expenses.
The 2015 MSR recommended a governance structure option for the District to establish mutual
aid agreements with nearby reclamation districts to formalize capacity and resource-sharing
Ch. 14 RD 2117 Policy Consulting Associates, LLC 322
plans during flood emergencies. However, this recommendation has not yet been
implemented.
Mutual aid agreements can significantly enhance emergency response by providing additional
personnel and specialized equipment, reducing risks during flood events. It is recommended
that the District explore this option to address shared challenges in the Delta region and
strengthen community resilience.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 323
14-1: RD 2117 has one landowner and an estimated population of around 4-6 people. The
District does not anticipate any population growth or development in the foreseeable
future.
14-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community
was identified as disadvantaged. According to the DWR Mapping Tool, the entirety of
the RD 2117 area is not considered a disadvantaged community.
14-3: RD 2117 is responsible for maintaining the levee system and drainage facilities that
provide flood protection for primarily agricultural land and infrastructure.
14-4: The District contracts out for all major services, including levee maintenance, flood
control, drainage, access road upkeep, weed abatement, slope protection, and
rodent/vector control services. Additionally, the District utilizes both direct and
contracted services for levee patrol and flood-fighting efforts.
Furthermore, the District contracts for legal and engineering services.
14-5: The District maintains approximately 5.48 miles of non-project levee. Other key
infrastructure includes one pump station and a bridge.
14-6: Of the District’s total 5.48 miles of levees, 0.02 miles (0.3 percent) currently fail to meet
the minimum HMP levee standard. Approximately 4.11 miles (75 percent) comply with
the PL 84-99 standard and 2.97 miles (54.2 percent) meet the more stringent Bulletin
192-82, levee standard.
14-7: The District’s desired level of protection is to meet the DWR Bulletin 192-82 levee
standard while also addressing any specific geotechnical seepage and/or stability issues
as needed.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 324
14-8: The District’s updated 2023 Five-Year Plan outlines two phases to achieve the desired
level of protection: rock slope protection and raising sections of the levee that are
below the Bulletin 192-82 Standard to six inches above that standard. The total
estimated cost for these projects is $6,697,000. The District anticipates that the Delta
Levees Program will be the sole source of funding available.
14-9: The District reports that the overall current service delivery is adequate; however,
more stringent and increasing regulations are expected to raise expenses.
14-10: The District receives funding from various sources, including assessments, state
assistance from participation in the Delta Levee Maintenance Subventions Program,
and other revenue sources.
14-11: In FY 21-22, the District's revenue of $69,772 exceeded expenses of $31,912 by
approximately 118.6 percent. However, in FY 22-23, expenses increased to $87,421,
exceeding revenue of $76,532 by about 14 percent. This increase in expenses which
rose by 174 percent was driven by added costs in payroll, insurance, rodent control,
professional fees, and levee maintenance costs compared to the previous fiscal year.
Although revenue increased by 10 percent, primarily from property assessments and
reimbursements (which were absent in FY 21-22), state assistance decreased by 46
percent. The District's funding structure, where costs are assessed to the sole
landowner minus state funding, could explain fluctuations in assessments across fiscal
years.
14-12: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
2117 is designated as “other priority”, meaning the District may be eligible for future
funding, depending on the progress of projects with higher priority designations.
Therefore, this is not an immediate funding opportunity.
14-13: The District has not identified any potential funding opportunities.
14-14: RD 2117 collaborates with Coney Island Farms for shared equipment and personnel.
Overall, there are limited opportunities for facility sharing, and the District has not
identified additional resource-sharing options.
14-15: RD 2117 is governed by a three-member board of trustees, each serving a staggered
four-year term.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 325
14-16: Since the 2015 MSR, RD 2117 has established a website that provides access to various
documents, including the District’s updated 2023 Five-Year Plan and financial reports,
such as the District’s Compensation Report and the State Controller’s Office Financial
Transaction Report. To further enhance transparency, it is recommended that the
District also make up-to-date audits and budgets available on the website.
14-17: The 2015 MSR also recommended establishing a regional mutual aid agreement with
nearby reclamation districts to formalize resource-sharing plans for emergencies.
However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges in
the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency across
districts.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 326
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 2117.
• RD 2117 is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• The District's land use includes agricultural production, which is supported by ancillary
farm buildings, a primary residence, and a caretaker residence.
• There are no anticipated changes in land use in the foreseeable future.
• The District is predominantly agricultural and anticipates no significant population growth
or development in the near future, indicating that demand for public services will remain
stable.
• RD 2117’s key infrastructure includes approximately 5.48 miles of non-project levee that
surrounds the District, one pump station, and a bridge.
• Of the District’s total 5.48 miles of levees, 0.02 miles (0.3 percent) currently fail to meet
the minimum HMP levee standard. Approximately 4.11 miles (75 percent) comply with
the PL 84-99 standard and 2.97 miles (54.2 percent) meet the more stringent Bulletin 192-
82 standard.
• The District’s desired level of protection is to meet the Bulletin 192-82 levee standard
while also addressing any specific geotechnical seepage and/or stability issues as needed.
• The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 327
• There are no communities of interest within RD 2117.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 2117 sphere of influence.
It is recommended that the Commission reaffirm the current SOI for RD 2117.
.
Ch. 14 RD 2117 Policy Consulting Associates, LLC 328
1 5 . RECL A MAT ION DIST RIC T 2 12 2 (W IN T ER
Reclamation District No. 2122 (Winter Island) was formed in August 1984 by the Contra Costa
County LAFCO as an independent special district to maintain, protect, and repair existing levees
and other reclamation works to benefit the District territory.
Historically, Winter Island was operated as a duck hunting club by Winter Island Farms. In 2016,
the California Department of Water Resources (DWR) purchased the island with the goal of
restoring tidal habitat and enhancing the ecosystem. As part of this effort, DWR implemented
the Winter Island Tidal Habitat Restoration Project, which was completed in September 2019.
The project restored tidal connectivity to the island’s interior, creating aquatic habitats at
intertidal and shallow subtidal elevations, as well as high marsh and riparian habitats to support
native fish species.
Winters Island is a wildlife habitat that supports at least 13 species of waterfowl and other
birds, as well as various mammal species, including the black-tailed jackrabbit, California ground
squirrel, pocket gophers, river otter, beaver, muskrat, striped skunk, and raccoon.
Current land uses on the island consist of 17 acres of grassland and 166 acres of open water,
with the remaining area classified as marshland.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 329
Figure 15-1: RD 2122 General Information
GENERAL information
Agency RD 2122 (Winter Island)
Address 3500 Industrial Blvd., West Sacramento, CA 95691
Principal Act California Water Code §50300 et seq.
Date Formed 1982
Population 0
Last SOI Update Novemeber 18, 2015
Services Provided Converted into a Restoration Site by DWR
Employees 0
Katherine Wadsworth, Board President
Contact Person Email: Katherine.wadsworth@water.ca.gov
Website N/A
Board
Members Length of Term Term Expiration
Katherine Wadsworth, President 4-Years 2027
Emma Mendonsa, Trustee 4-Years 2025
Shaun Rohrer, Trustee 4-Years 2027
RD 2122 is 0.69 square miles or approximately 441 acres in size.117 RD 2122 is a Delta island
located in Contra Costa County in the western Delta northeast of Browns Island and the City of
Pittsburg. The District is within the Primary Zone of the Sacramento-San Joaquin Delta and is
outside the countywide urban limit line (ULL).
The current SOI for RD 2122 is coterminous with the District’s boundaries. The SOI was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
117 Contra Costa LAFCO, County Services Areas, Directory of Local Agencies. Section 11: Reclamation Districts. May 2024.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 330
Figure 15-2: RD 2122 Boundaries and SOI
Ch. 15 RD 2122 Policy Consulting Associates, LLC 331
Ch. 15 RD 2122 Policy Consulting Associates, LLC 332
RD 2122 is governed by three board members serving four-year terms. The District has no
additional staff.
Winter Island has no permanent residents, and no development or growth is anticipated for the
foreseeable future.
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.118
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
118 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 333
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
RD 2122 is uninhabited and used as a restoration site. There are no DUCs within the District’s
boundary.
The District operates out of a governmental fund comprising a general fund, which accounts for
the resources used to finance its general operations. At present, the District’s sole source of
revenue is a reimbursement agreement with DWR through its Real Estate Branch.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 334
Figure 15-3: RD 2122 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Revenue FY 21-22 FY 22-23 % Change
Total Revenue 14,972 $7,028 -53
Expenditures
Legal and Accounting $9,570 $9,310 -3
Insurance $1,998 $1,998 0
Engineering $312 $125 -60
Advertising $158 - -100
Office Expenses $83 $65 -22
Dues and Subscription $6 $6 0
Total Expenditure $12,127 $11,504 -5
Excess (deficiency) of Receipts Over
Disbursements Prior to Other Financing
Sources (Uses) $2,845 $(4,476)
Fund Balance, Beginning of Year $(9,753) $(6,908) 29
Fund Balance, End of Year $(6,908) $(11,384) 65
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 21-22, the District’s total expense of $12,127 exceeded total revenue of $14,972 by
$2,845 or approximately 23 percent. Similarly, in FY 22-23, the District’s total expenses of
$11,504 exceeded total revenue of $7,028 by $4,476 or approximately 38 percent. As shown in
Figure 15-3, the increase in the deficit is due to the 53 percent decrease in the District's sole
source of revenue, which fell from $14,972 in FY 21-22 to $7,028 in FY 22-23.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 335
The District’s fund balance at the end of FY 22-23 also decreased by 65 percent to $(11,384)
from the FY 21-22 ending fund balance of $(6908). This negative ending fund balance indicates
that the District is operating at a deficit.
The District may be eligible for funding from programs focused on wetland restoration,
endangered species protection, and ecosystem health, which aligns with RD 2122’s current
restoration functions.
The District did not identify any additional potential funding.
Currently, RD 2122 does not operate any facilities on Winter Island. While the District
previously provided levee maintenance and reconstruction services, DWR now uses the island
solely as a habitat restoration site. In 2019, as part of the Winter Island Tidal Habitat
Restoration Project, the five miles of levees that were previously maintained by the District
were breached to restore tidal connectivity and enhance wetland habitats.
As previously mentioned, Winter Island is now exclusively managed by the California
Department of Water Resources (DWR) as a restoration site. As part of this project, the levees
were breached to transform the interior land into a tidal marsh. This transformation has shifted
the island's focus from its original reclamation functions, such as levee maintenance and flood
control, to ecological conservation.
Since RD 2122’s reclamation functions are no longer necessary and the District is effectively
inactive—without facilities, staff, or the infrastructure to carry out its original functions—and is
operating with an ongoing negative fund balance, the dissolution of RD 2122 is recommended.
Under Government Code §56375, LAFCO has the authority to initiate the dissolution of an
inactive district, provided it meets the definition outlined in Government Code §56042, which
includes:
Ch. 15 RD 2122 Policy Consulting Associates, LLC 336
• The special district is as defined in Section 56036.
• The special district has had no financial transactions in the previous fiscal year.
• The special district has no assets and liabilities.
• The special district has no outstanding debts, judgments, litigation, contracts, liens, or
claims.
If LAFCO determines RD 2122 is inactive, it may proceed with dissolution under a streamlined
process outlined in Government Code § 56879, which requires a single public hearing within 90
days of initiating dissolution. Additionally, if LAFCO decides on the dissolution of RD 2122, it
must identify the effective date of dissolution, designate a successor agency to wind up the
affairs of the extinguished agency, and may apply other terms and conditions with its action
pursuant to GC §§56885 – 56890.
Since DWR already owns and manages Winter Island for habitat restoration, with operations
funded through a reimbursement agreement with its Real Estate Branch, LAFCO could
potentially designate DWR as the successor agency. However, it is unclear whether any
precedents exist for designating DWR as a successor agency.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 337
15-1: RD 2122 has no residents and does not anticipate any population growth or
development in the foreseeable future.
15-2: RD 2122 is uninhabited and is used as a restoration site. There are no DUCs.
15-3: Currently, RD 2122 does not operate any facilities on Winter Island. While the District
previously provided levee maintenance and reconstruction services, DWR now uses the
island solely as a habitat restoration site.
15-4: Currently, the District’s sole source of revenue comes from a reimbursement agreement
with DWR.
15-5: In FY 21-22, the District’s total expense of $12,127 exceeded total revenue of $14,972 by
$2,845 or approximately 23 percent. Similarly, in FY 22-23, the District’s total expenses
of $11,504 exceeded total revenue of $7,028 by $4,476 or approximately 38 percent.
This increase in deficit is due to a 53 percent decrease in the District’s sole revenue in
FY 21-22 from $14,972 to $7,028 in FY 22-23.
15-6: The District did not identify any current or potential opportunities for shared facilities.
15-7: A dissolution of RD 2122 is recommended due to the shift in the District’s functions,
which indicates that the District is considered inactive.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 338
Ch. 15 RD 2122 Policy Consulting Associates, LLC 339
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 2122.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• The island's land uses include 17 acres of grassland, 166 acres of open water, and the
remaining acres classified as marshland.
• There are no anticipated changes in land use in the foreseeable future.
• RD 2122 has shifted from reclamation functions to a restoration site since DWR purchased
Winter Island in 2016.
• The District has no residents and does not anticipate any population growth or
development in the foreseeable future, indicating that demand for public services will
remain unchanged.
• As discussed above, RD 2122 has shifted from reclamation functions to a restoration site.
The District no longer maintains any facilities as the levees have been breached, and the
interior land was converted into a tidal marsh in 2019.
• RD 2122 is uninhabited, and there are no communities of interest.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 340
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 2122 sphere of influence.
It is recommended that the Commission adopts a Zero SOI in anticipation of the District’s
dissolution.
Ch. 15 RD 2122 Policy Consulting Associates, LLC 341
1 6 .
Reclamation District (RD) 2137 (Dutch Slough) was formed on July 9, 2003, by Contra Costa
LAFCO as an independent special district. RD 2137 operates under Section 50000 of the
California State Water Code to provide services within the District’s boundaries.
Current land uses within the District are primarily tidal marsh and open space/habitat area.
Dutch Slough is part of DWR’s California EcoRestore initiative, which aims to restore 30,000
acres of critical habitat in the Delta to rebuild dwindling populations of native wildlife, including
migratory birds and fish. The majority of the District’s lands comprise the Dutch Slough Tidal
Marsh Restoration Project site, which was acquired by the Department of Water Resources
(DWR) in 2003.
The Project area, which comprises three parcels—Emerson, Gilbert, and Burroughs119—covers
approximately 1,178 acres and aims to restore these lands to tidal marsh, tidal channels, tidal
open water, managed marsh, riparian woodland, and upland grasslands. The construction of
the first two parcels (Emerson and Gilbert), which are within RD 2137 boundaries, involved five
external levee breaches, two internal levee breaches, levee degradations, levee raises, and the
installation of two bridges at major breaches for future use. This first phase of the project was
completed in 2022.
The second phase of the project focuses on developing 55 acres in the south-central portion of
Dutch Slough, which is owned by the City of Oakley, into a community park. The park
development aims to enhance amenities by adding biking and walking trails, as well as
providing access to the shoreline and fishing areas. Additionally, interpretive signs will be
installed to educate visiting schools and community groups about the history and marsh
119 The Burroughs Parcel is within RD 799 boundaries. There has not been any progress on the restoration project associated
with this parcel.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 342
ecology of Dutch Slough.120 The District reports that the City of Oakley has yet to provide a
timeline for completing this phase of the project.
The District currently has no residents, and no growth or development is anticipated in the
foreseeable future.
120 California Department of Water Resources (DWR), News Release. DWR Completes First Phase of Dutch Slough Tidal
Restoration Project. November 23, 2021.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 343
Figure 16-1: RD 2137 General Information
GENERAL information
Agency RD 2137
343 East Main Street, Suite 715
Address Stockton, CA 95202
Principal Act California Water Code §50000 et seq.
Date Formed 2003
Population 0
Last SOI Update Novemeber 18, 2015
Improve and maintain levees and flood control
Services Provided system including pumps, canals and ditches
Employees 2; District Engineer and District Secretary
Pamela A. Forbus, District Secretary
Contact Person Email: pamforbus@scglobal.net
Website reclamationdist.wixsite.com/rd2137
Board
Members Length of Term Term Expiration
Kevin Romick 4-Years 2027
Molly Ferrell 4-Years 2025
Emma Mendonsa 4-Years 2027
RD 2137 encompasses 785 acres (approximately 1.2 square miles). The District lies entirely
within the boundaries of the City of Oakley, east of Highway 4, north of Cypress Road, and can
be accessed via Sellers Avenue.
The District is within the Sacramento-San Joaquin Delta and the countywide urban limit line
(ULL).
The current SOI for RD 2137 is coterminous with the District’s boundaries. The SOI was last
reaffirmed by Contra Costa LAFCO on November 18, 2015.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 344
Ch. 16 RD 2137 Policy Consulting Associates, LLC 345
Figure 16-2: RD 2137 Boundaries and SOI
Ch. 16 RD 2137 Policy Consulting Associates, LLC 346
Ch. 16 RD 2137 Policy Consulting Associates, LLC 347
The District is governed by an elected three-member board serving four-year terms. Two Board
members are designated representatives of the State Department of Water Resources (DWR),
the District's major landowner. The third Trustee is a designated representative of the City of
Oakley, which is also a landowner within the District.
Meetings are held on an as-needed basis at 455 University Avenue, Suite 100, Sacramento, CA
95825. Agendas are posted on the District’s website, in compliance with the Brown Act121
(Government Code §§ 54954.2 and 54956), as amended by California AB 2257, which requires
agencies to make agendas available on their websites and in a publicly accessible physical
location at least 72 hours prior to regular meetings and at least 24 hours prior to special
meetings. Additionally, an archive of agenda packets for meetings held since 2023 is available
on the website. It is recommended that the District also make meeting minutes available on the
website.
Since the 2015 MSR, the District has launched a website in compliance with SB 929122 that
offers limited information, including contact details and financial documents, such as, the
District's Compensation Report and the State Controller's Office Financial Transaction Report.
To further enhance transparency, it is recommended that the District also make up-to-date
audits and budgets available on the website.
RD 2137 has demonstrated accountability in its disclosure of information and cooperation with
LAFCO questionnaires and other requests for information.
121 California Government Code, Section 54950, commonly known as the "Brown Act" or "Open Meeting Law," establishes
requirements and restrictions for meetings of local legislative bodies. The law ensures public access to these meetings,
facilitating public participation and promoting transparency in local government decision-making.
122 Senate Bill 929 (The Special Districts Transparency Act), passed in 2018, established that beginning January 1, 2020, every
independent special district must maintain an internet website unless the governing board adopts a resolution declaring its
determination that a hardship exists that prevents the district from establishing or maintaining a website. The Act also outlines
the minimum information required to be available on the website.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 348
LAFCo is required to evaluate disadvantaged unincorporated communities as part of this service
review, including the location and characteristics of any such communities. The intent and
history of this requirement are outlined in the Background Section of this report.
A disadvantaged unincorporated community (DUC) is defined as any area with 12 or more
registered voters, or as determined by commission policy, where the median household income
is less than 80 percent of the statewide annual median.123
The California Department of Water Resources (DWR) has developed a mapping tool to assist in
determining which communities meet the disadvantaged community's median household
income definition. DWR is not bound by the same law as LAFCO to define communities with a
minimum threshold of 12 or more registered voters. Because income information is not
available for this level of analysis, disadvantaged unincorporated communities with smaller
populations that meet LAFCO’s definition cannot be identified at this time.
The DWR Mapping Tool is an interactive map application that allows users to overlay the
following three US Census geographies as separate data layers—Census Place, Census Tract,
and Census Block Group. The specific dataset used in the tool is the US Census American
Community Survey Five-Year Data: 2016 - 2020. Only those census geographies that meet the
disadvantaged community (DAC) definition are shown on the map (i.e., only those with an
annual median household income (MHI) that is less than 80 percent of the Statewide annual
MHI). The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097, and hence, the calculated threshold of $67,277 defines whether a community was
identified as disadvantaged.
Per the DWR Mapping Tool, the entire boundary of RD 2137 is not considered a disadvantaged
community.
123 Government Code §56033.5 defines a DUC as 1) all or a portion of a “disadvantaged community” as defined by §79505.5 of
the Water Code, and as 2) “inhabited territory” (12 or more registered voters), as defined by §56046, or as determined by
commission policy.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 349
The District funds its operations and administration through property assessments from the
two landowners and grant funding from the State Delta Levee Subventions Program or Special
Grants for specific projects.
Assessments are based on the total land or acreage held by the landowners within the District,
adjusted for revenues received from the State under the Levee Subvention Program or other
grants.
The District utilizes bank loans in the form of short-term “warrants” to support cash flow and
fund large-scale projects. During FY 21-22 and FY 22-23, the District borrowed funds through
registered warrants issued by the Bank of Stockton. At the beginning of FY 22-23, the District
had an outstanding balance of $400,000 and borrowed an additional $800,000 during the year.
The District repaid the total of $1,200,000 by the end of the fiscal year, resulting in no
outstanding balance in registered warrants.124
The District operates out of a governmental fund that consists of a general fund, which finances
the general services that the District performs. Assessments and other revenue sources that
support the District's primary operations are included in this fund. This fund is charged with all
operating costs that do not have a separate fund established.
124 Reclamation District No. 2137. Financial Statements and Independent Auditor’s Report. June 30, 2023. p.20.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 350
Figure 16-3: RD 2137 Financial Summary, FY 21-22 and FY 22-23
Financial Summary
Total Governmental Funds
Revenues FY 21-22 FY 22-23 % Change
State Assistance
Work Agreements $5,031,556 $3,729,670 -26
Subventions $23,473 $4,627 -80
Assessments $100,004 $100,004 0
Interest Income $242 $7,163 2860
Total Revenue $5,155,275 $3,841,461 -25
Expenditures
Levee Repairs and Maintenance $6,554,272 $1,633,607 -75
Utilities $42,702 $21,460 -50
Legal and Accounting $29,159 $57,692 98
Engineering $10,588 $321,998 2941
Insurance $6,213 $7,367 19
Licenses and Permits $5,919 $2,737 -54
Payroll Expenses $485 $10,088 1980
Payroll Taxes $181 $937 418
Miscellaneous $67 $11,182 16590
Vegetation/ Rodent Control - $4,055
Supplies - $591
Dues $100 $142 42
Debt Services
Principal - $1,200,00
Interest - $10,938
Total Expenditures $6,649,686 $3,282,793 -51
Excess (deficiency) of Revenues Over
Expenditures Prior to Other Financing
Sources (Uses) $(1,494,411) $558,668 -137
Total Other Financing Sources (Uses) $400,000 $800,000 100
Ch. 16 RD 2137 Policy Consulting Associates, LLC 351
Net Change in Fund Balance (deficit) $(1,094,411) $1,358,668 -224
Fund Balance, Beginning of Year $166,894 $(927,517) -656
Fund Balance, End of Year $(927,517) $431,151 146
Recurring operating deficits are a warning sign of fiscal distress. In the short term, reserves can
backfill deficits and maintain services. However, ongoing deficits eventually will deplete
reserves.
In FY 21-22, the District’s total expenses of $6,649,686 exceeded total revenue (excluding other
financing sources) of $5,155,275 by $1,494,411, or 29 percent. In contrast, in FY 22-23, total
revenue (excluding other financing sources) of $3,841,461 exceeded total expenses of
$3,282,793 by $558,668 or approximately 17 percent.
As shown in Figure 10-3, total revenue decreased by 25 percent from $5,155,275 in FY 21-22 to
$3,841,461 in FY 22-23, primarily due to a 26 percent decline in state assistance. In both fiscal
years, DWR work agreements likely tied to the Dutch Slough Tidal Marsh Restoration Project
account for over 97 percent of total revenue. These unusually high amounts reflect project-
specific funding and are not expected to continue in future years.
Total expenses also decreased by 51 percent during this period, from $6,649,686 to $3,282,793,
largely due to a significant decline in levee maintenance and repair costs, which fell from
$6,554,272 in FY 21-22 to $1,633,607 in FY 22-23. These expenses accounted for the majority of
total spending in both years and were also likely tied to the Restoration Project.
The District’s ending fund balance increased by 146 percent in FY 22-23, shifting from a deficit
of $(927,517) in FY 21-22 to a surplus of $431,151. This ending fund balance represents 13
percent of FY 22-23 expenditures, indicating that the District has sufficient reserves to cover
approximately one month of operating costs, assuming expenses remain stable. However, this
reserve level is relatively low and may not adequately cover unexpected expenses or revenue
shortfalls. It is also important to note that the District’s fund balance includes the $800,000
Ch. 16 RD 2137 Policy Consulting Associates, LLC 352
registered warrants issued by the Bank of Stockton; therefore, that portion is not fully available
as a reliable income source.
According to the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD 2137
(Dutch Slough) is designated as very-high priority. This designation applies to levees that
significantly reduce flood risks to human life, protect state water supplies from saltwater
intrusion, and sustain critical ecosystems or agricultural lands vital to the Delta region in areas
most at risk. Based on DLIS’s funding prioritization, islands or tracts with these designations are
given priority by DWR for levee project funding.
The District currently maintains a total of 3.1 miles of levees, including a 1.6-mile flood control
levee constructed in 2020 along the southern border of the DWR restoration. This levee was
built using the DWR’s Urban Levee Design Criteria (ULDC) and provides a 200-year level of flood
protection.
The remaining 1.5 miles of levees maintained by the District are now interior levees located
within the Restoration Project area. Of these, 0.9 miles consist of the Marsh Creek West levee,
which was formerly maintained by the Contra Costa County Flood Control and Water
Conservation District and acquired by DWR prior to the implementation of the restoration
project. This levee segment was not modified by the Project and the District has agreed to
assume maintenance responsibilities on behalf of DWR.
The District also maintains the southern end of the Emerson Slough levee, 0.6 miles segment
that protects property owned by the City of Oakley.
In addition to levees, the District is responsible for maintaining two elevated trails totaling 1.4
miles:
Ch. 16 RD 2137 Policy Consulting Associates, LLC 353
• The Emerson drainage divide (0.9 miles) separates open water from the restored tidal
marsh on the Emerson parcel. This trail, which was constructed as part of the Restoration
Project, provides public access.
• The Gilbert cross (0.5 miles), constructed in 2020, separates managed marsh from the
restored tidal marsh on the Gilbert parcel.
By the end of 2021, the Emerson and Gilbert perimeter levees that spanned approximately 5.2
miles were breached as part of the Restoration Project. There are no other records of any
recent unplanned levee breaches that resulted in widespread flooding or extended inundation.
Historically, localized flooding has been reported at a house located at the south end of
Emerson Slough during high-water events, when the levee would occasionally overtop and
flood the basement of the house. This section of the levee was partially rehabilitated by the
District in 2007 and fully rehabilitated in 2017 by the District. No flooding incidents have been
reported since the rehabilitation.125
RD 2137 has prepared an updated 2023 Five-Year Plan, which outlines the progress made since
the previous plan, details the current and desired levels of flood protection, and includes the
District’s plan for achieving its protection goals.
According to the Plan, by 2017, the District had completed all levee improvement projects
proposed in the prior Five-Year Plan adopted in 2009. These projects included levee
rehabilitation and the removal of encroachments to ensure that the entire levee system meets
the HMP standard.
As previously mentioned, the perimeter levees on the Emerson and Gilbert parcels have since
been intentionally breached as part of the Dutch Slough Restoration Project. Of the total 3.1
miles of levee the District currently maintains, 1.5 miles of interior levees meet or exceed the
125 Reclamation District No. 2137, 2023 Five-Year Plan. February 27, 2023. p.2-11.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 354
HMP standard. While the recently constructed 1.6-mile flood control levee meets or exceeds
the HMP, PL 84-99, and Bulletin 192-82 levee standards.
According to the 2023 Five-Year Plan, the District’s desired level of protection is to continue
regular maintenance of the levees, including vegetation control and periodic slope repair
activities, to prevent erosion and degradation. The estimated annual cost to maintain each
levee segment, as well as the elevated trails, is approximately $25,000 per mile.126 However,
the cost of maintaining the Emerson drainage divide may vary year to year due to the impact of
public access. Pedestrian traffic and the presence of unauthorized encampments in this area
may necessitate more frequent maintenance and ongoing monitoring, such as a dedicated staff
on site to address issues in a timely manner.
The 2023 Five-Year Plan indicates that with adequate funding from the majority landowner
(DWR), the District can continue to maintain the levees associated with the Restoration Project.
Additionally, reimbursement from the Delta Levee Maintenance Subventions program for
maintenance expenditures of the levee system is also identified as another potential funding
source. The District has participated in the Subventions program since 2006.
It is recommended that the District make the updated Five-Year Plan available on its website to
further enhance transparency.
126 Reclamation District No. 2137, 2023 Five-Year Plan. February 27, 2023. p.11.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 355
Figure 16-4: RD 2137 Service Configuration, Facilities, and Inspections Overview
Overview
District Overview
Total Levee Miles 3.1 Surface Elevation -10 to 10 feet
Miles of Levees by Standard Levee Miles by Type
Dry Land Levee 0.0
HMP Standard 3.1 1 Urban Levee 1.6
PL 84-99 Standard 1.6 2 Agricultural Levee 0.0
Bulletin 192-82 Standard 1.6 3 Other 1.5
District Facilities
Internal Drainage System Yes Pump Station(s) No
Detention Basins(s) No Bridges 1
Floodplain
FIRM Designation AE Base Flood Elevation 7 feet
Levee Inspection Practices
RD 2137 does not have a formal levee inspection procedure. Instead, levee patrols are
performed through contracts with engineering firms.
Levee Segment Description Condition
Meets the 200-year Urban
Constructed as part of the Standard, HMP, PL 84-99,
South Levee restoration project and Bulletin 192-82
Owned by DWR, maintained by RD
Marsh Creek West Levee 2137 Meets HMP Standard
Earthen levee extending to south
Emerson Slough end of Emerson Slough Meets HMP Standard
Levee Maintenance
According to the 2023 Five-Year Plan, the estimated annual cost per mile to maintain each
levee segment is approximately $25,000.
Infrastructure Needs/Deficiencies
No infrastructure needs have been identified; however, the District plans for continued
maintenance of levees, including vegetation control and periodic slope repairs, to prevent
erosion or degradation.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 356
1: The District’s entire levee system meets or exceeds the HMP standard.
2: 1.6 miles of the District’s levee system or the recently constructed south levee meets the PL
84-99
3: 1.6 miles of the District’s levee system or the recently constructed south levee meets Bulletin
192-82 Levee Standard.
The District contracts for a range of services, including levee maintenance, drainage, flood
control, levee patrol, upkeep of levee access roads, weed abatement, vector and rodent
control, and slope protection. Additionally, flood fighting and levee patrol services are delivered
both directly by the District and through contracts.
RD 2137 shares administrative facilities, legal counsel, engineering services, and auditors with
other reclamation districts in Contra Costa and San Joaquin Counties. The District reports that
further efficiencies are also achieved through collaboration and facility-sharing efforts with the
two landowners (the City of Oakley and DWR) through shared equipment and personnel for
levee maintenance activities.
The District has not reported any significant infrastructure needs.
The District has not identified any significant challenges in service delivery.
The 2015 MSR identified the following governance structure options for RD 2137:
• First, establishing a regional mutual aid agreement with nearby reclamation districts to
formalize resource-sharing plans for flood emergencies was recommended. This option
Ch. 16 RD 2137 Policy Consulting Associates, LLC 357
has not yet been implemented. Mutual aid agreements can significantly enhance
emergency response by providing additional personnel and specialized equipment,
reducing risks during flood events. It is recommended that the District explore this option
to address shared challenges in the Delta region and strengthen community resilience.
The District can also further explore existing resource-sharing efforts with neighboring
reclamation districts in Contra Costa and San Joaquin counties, as well as current facility-
sharing practices with DWR and the City of Oakley, to identify new opportunities for
collaboration and cost-sharing.
• Second, it was recommended that RD 2137 is established as a subsidiary district of the
City of Oakley, with the City Council acting as the Board of Directors. However, this option
is not feasible due to California Government Code §57105, which requires that at least 70
percent of the district’s land area and registered voters must be within the city limits for
a district to qualify as a subsidiary. In the case of RD 2137, the City of Oakley owns only
55 acres of parkland within the District, which is a small portion compared to the City’s
total area of 1,241 acres, indicating that it will not meet the required 70 percent
threshold.
• A third governance option was recommended, involving the dissolution of RD 2137 and
the transfer of responsibility restoration of the tract as part of the Dutch Slough Tidal
Marsh Restoration Project. This would include the construction of any necessary new
levees or the repair and maintenance of existing levees, with the State of California and/or
the City of Oakley serving as successor agencies. However, this option has not been
implemented.
As previously discussed, both the City of Oakley and DWR are landowners within the
District. Consequently, if either agency were to assume the reclamation functions
currently performed by the District, significant coordination would be necessary. It is also
important to note that reclamation districts have statutory authority to carry out
reclamation functions under California Water Code Sections 50000-53901.
In contrast, DWR’s primary role, for instance, is to protect, conserve, develop, and
manage much of California’s water supply. While DWR participates in flood management
Ch. 16 RD 2137 Policy Consulting Associates, LLC 358
and infrastructure projects for Delta islands—such as Dutch Slough—through programs
including, the State Water Project (SWP), Delta water conveyance, and habitat
restoration, there are no precedents for DWR fully replacing a reclamation district in
California.
In the case of City of Oakley, there are examples across California of cities partnering with
existing RDs or forming joint agencies to assume reclamation functions and effectively
manage water infrastructure needs. For example, the City of West Sacramento is
protected from riverine flooding by levees and has a designated reclamation district, RD
900, which is responsible for operating and maintaining the levees and the internal
drainage system to reduce flood risk within its boundaries.
In the case of Oakley, only 55 acres of land within RD 2137 is owned by the City, while the
rest is owned by DWR and is located in the unincorporated part of Contra Costa County.
As a result, the City’s full takeover of the reclamation functions for RD 2137 may not be
feasible. Additionally, while cities have general municipal powers, they do not have the
automatic authority to manage levees, drainage, or reclamation services, as these
functions typically fall under the jurisdiction of special districts (RDs) as defined
in California Water Code Sections 50000-53901.
• Another governance option proposed was to place all areas within the Dutch Slough Tidal
Marsh Restoration Project site under a single reclamation district, either through the
dissolution of RD 2137 and annexation to RD 799 or the detachment of the portion of the
Project area from RD 799 (the Burroughs parcel) and annexing it to RD 2137. This
recommendation has not been implemented, and neither District has expressed interest
in pursuing this option.
Currently, the portion of the Project within the Burroughs parcel, which is within the RD
799 boundaries, is in the planning phase. Additionally, no direct impacts to RD 799 have
been observed from Project activities occurring within RD 2137 boundaries on the
Emerson and Gilbert parcels. Therefore, no reorganization efforts are recommended at
this time.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 359
Ch. 16 RD 2137 Policy Consulting Associates, LLC 360
16-1: RD 2137 has no residents and anticipates no population growth or development in the
foreseeable future.
16-2: The statewide MHI for 2017-2021, according to Census Bureau data, is estimated at
$84,097; hence, the calculated threshold of $67,277 defines whether a community is
identified as disadvantaged. According to the DWR Mapping Tool, the entirety of the
RD 2137 area is not considered a disadvantaged community.
16-3: The District provides flood protection and drainage services within its boundaries.
16-4: The District contracts for a range of services, including levee maintenance, drainage,
flood control, levee patrol, upkeep of levee access roads, weed abatement, vector and
rodent control, and slope protection. Additionally, flood fighting and levee patrol
services are delivered both directly by the District and through contracts.
16-5: The District maintains a total of 3.1 miles of levees, which include a 1.6-mile flood
control levee that was constructed in 2020 and 1.5 miles of interior levees located
within the Dutch Slough Restoration Project area.
16-6: Additionally, the District is responsible for maintaining two elevated trails (the
Emerson Drainage divide and the Gilbert cross) totaling 1.4 miles.
16-7: Of the total 3.1 miles of levee the District currently maintains, 1.5 miles of interior
levees meet or exceed the HMP standard. While the recently constructed 1.6-mile
flood control levee meets or exceeds the HMP, PL 84-99, and Bulletin 192-82 levee
standards.
16-8: According to the 2023 Five-Year Plan, the District’s desired level of protection is to
continue regular maintenance of the levees, including vegetation control and periodic
slope repair activities, to prevent erosion and degradation.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 361
16-9: The estimated annual cost to maintain each levee segment, as well as the elevated
trails, is approximately $25,000 per mile. However, the cost of maintaining the
Emerson drainage divide may vary year to year due to the impact of public access.
Pedestrian traffic and the presence of unauthorized encampments in this area may
necessitate more frequent maintenance and ongoing monitoring, such as a dedicated
staff on site to address issues in a timely manner.
16-10: The 2023 Five-Year Plan indicates that with adequate funding from the majority
landowner (DWR), the District can continue to maintain the levees associated with
the Restoration Project. Additionally, reimbursement for levee maintenance
expenditures through the Delta Levee Maintenance Subventions program is
identified as another potential funding source. The District has participated in the
Subventions program since 2006.
16-11: The District has not reported any significant infrastructure needs, and overall,
current service delivery is generally adequate.
16-12: RD 2137 funds its operations and administration through property assessments from
the two landowners and grant funding from the State Delta Levee Subventions
Program or Special Grants for specific projects.
16-13: The District also utilizes short-term bank loans, referred to as “warrants," to support
cash flow and fund large-scale projects.
At the beginning of FY 22-23, the District had an outstanding balance of $400,000 and
borrowed an additional $800,000 throughout the year. By the end of the fiscal year,
the District fully repaid the total amount of $1,200,000, resulting in no outstanding
balance in registered warrants.
16-14: In FY 22-23, total revenue (excluding other financing sources) of $3,841,461
exceeded total expenses of $3,282,793 by $558,668, or by 17 percent. In contrast, in
FY 21-22, total expenses of $6,649,686 exceeded total revenue (excluding other
financing sources) of $5,155,275 by $1,494,411, or 29 percent.
Revenue declined 25 percent, primarily due to a 26 percent decrease in state
assistance. Over 97 percent of revenue in both years came from DWR work
agreements tied to the Dutch Slough Tidal Marsh Restoration Project. These high,
project-specific funds are not expected to remain as a revenue base.
Expenses fell 51 percent, driven by a decrease in levee maintenance costs from
$6,554,272 to $1,633,607, which accounted for most of the total spending and was
likely related to the Restoration Project.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 362
16-15: Under the Delta Stewardship Council’s Delta Levee Investment Strategy (DLIS), RD
2137 is designated as “vey-high priority.” This designation applies to levees that
significantly reduce flood risks to human life, protect state water supplies from
saltwater intrusion, and sustain critical ecosystems or agricultural lands vital to the
Delta region in areas most at risk. Based on DLIS’s funding prioritization, islands or
tracts with these designations are given priority by DWR for levee project funding.
16-16: The District has not identified additional potential funding opportunities.
16-17: RD 2137 engages in resource sharing practices with other reclamation districts in
Contra Costa and San Joaquin Counties for administrative facilities, legal counsel,
engineering services, and auditing services.
Additional efficiencies are also achieved through collaboration with the City of
Oakley and DWR, sharing equipment and personnel for levee maintenance.
16-18: RD 2137 is governed by a three-member board of trustees, each serving staggered
four-year terms.
16-19: Since the 2015 MSR, the District has launched a website that offers limited
information including an archive of agenda packets for meetings held since 2023, as
well as key financial reports such as, District’s Compensation Report and the State
Controller’s Office Financial Transaction Report. To further improve transparency, it
is recommended that the District ensure that an up-to-date Five-Year Plan, audits,
budgets, and meeting minutes are easily accessible on the website.
16-20: The 2015 MSR also recommended establishing a regional mutual aid agreement with
nearby reclamation districts to formalize resource-sharing plans for emergencies.
However, this recommendation has not yet been implemented.
It is recommended that the District explore this option to address shared challenges
in the Delta region and strengthen community resilience. Developing such regional
partnerships could reduce shared expenses and improve operational efficiency
across districts.
16-21: Other recommendations include making RD 2137 a subsidiary of the City of Oakley;
however, this is not a feasible option as the City owns only a small portion of the
District’s land, which does not meet the 70 percent threshold required under
California Government Code §57105.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 363
Transferring RD 2137’s responsibilities to the State or the City of Oakley was also
recommended; however, it has not been implemented. This option would require
extensive coordination and lacks precedent, as DWR has never fully assumed the role
of a reclamation district.
Another recommendation proposed consolidating the Dutch Slough Project area,
including RD 2137 and RD 799, under a single reclamation district through annexation
or detachment; however, this option was also not implemented. The portion of the
Project within the Burroughs parcel, which is within the RD 799 boundaries, remains
in the planning phase. Additionally, no direct impacts to RD 799 have resulted from
Project activities occurring within the RD 2137 boundaries on the Emerson and
Gilbert parcels.
Therefore, no reorganization efforts are recommended at this time.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 364
LAFCO is required to prepare a written statement of determination with respect to the
following areas when updating a special district’s Sphere of Influence, as specified by the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The following
determinations are proposed for Reclamation District 2137.
• The District is not a land use authority and does not hold primary responsibility for
implementing growth strategies.
• Current land uses within the District are primarily tidal marsh and open space/habitat
area.
• The majority of the District’s lands comprise the Dutch Slough Tidal Marsh Restoration
Project site, which involves restoring the area to tidal marsh, tidal channels, tidal open
water, managed marsh, riparian woodland, and upland grasslands.
• The project also includes the development of a 55-acre community park in the south-
central portion of Dutch Slough, owned by the City of Oakley; however, a timeline for this
phase of the project has yet to be established.
• The District anticipates no significant population growth or development in the near
future, indicating that demand for public services will remain stable.
• The District maintains a total of 3.1 miles of levees, which include a 1.6-mile flood control
levee that was constructed in 2020 and 1.5 miles of interior levees located within the
Dutch Slough Restoration Project area.
• The District is also responsible for maintaining two elevated trails (the Emerson Drainage
divide and the Gilbert cross) totaling 1.4 miles.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 365
• Of the total 3.1 miles of levee the District currently maintains, 1.5 miles of interior levees
meet or exceed the HMP standard. While the recently constructed 1.6-mile flood control
levee meets or exceeds the HMP, PL 84-99, and Bulletin 192-82 levee standards.
• According to the 2023 Five-Year Plan, the District’s desired level of protection is to
continue regular maintenance of the levees, including vegetation control and periodic
slope repair activities, to prevent erosion and degradation.
• The District has not reported any significant infrastructure needs, and overall, current
service delivery is generally adequate.
• There are no communities of interest within RD 2137.
ANY DISADVANTAGED UNINCORPORATED COMMUNITIES WITHIN THE
• There are no disadvantaged unincorporated communities (DUCs) within or contiguous to
the RD 2137 sphere of influence.
It is recommended that the Commission reaffirm the current SOI for RD 2137.
Ch. 16 RD 2137 Policy Consulting Associates, LLC 366
CONTRIBUTORS
Name Title
Angelia H. Tant District Manager
Cecilia Goff District Secretary
Dante John Nomellini, Sr. General Manager/ District Counsel
Dante J. Nomellini, Jr. General Manager/ District Counsel
Dina Holder District Secretary
Jake Messerli Trustee/ Chairman
Katherine Wadsworth Board President
Lou Ann Texeira Executive Officer
Nate Hershey District Engineer
Sonnet Rodrigues District Manager
Pam Forbus District Secretary/ Attorney
Contributors Policy Consulting Associates, LLC 367