Municipal Service Review:
Reclamation Services
Final
Adopted July 8, 2009
Contra Costa Local Agency Formation Commission
Burr Consulting and Baracco & Associates
TABLE OF CONTENTS
ACRONYMS ................................................................................................................................................................ 7
PREFACE .................................................................................................................................................................... 8
1. EXECUTIVE SUMMARY ..................................................................................................................................... 1
2. LAFCO AND MUNICIPAL SERVICE REVIEWS ............................................................................................. 8
LAFCO OVERVIEW ................................................................................................................................................... 8
MUNICIPAL SERVICE REVIEW ORIGINS ..................................................................................................................... 9
MUNICIPAL SERVICE REVIEW LEGISLATION ............................................................................................................ 11
SPHERES OF INFLUENCE ........................................................................................................................................... 12
MSR AND SOI UPDATE PROCESS ............................................................................................................................ 14
3. STUDY AREA: THE SACRAMENTO-SAN JOAQUIN DELTA .................................................................... 15
AREA OVERVIEW ..................................................................................................................................................... 15
DELTA RISKS ........................................................................................................................................................... 16
LEVEE CLASSIFICATIONS AND STANDARDS ............................................................................................................. 20
DEMOGRAPHICS AND GROWTH ................................................................................................................................ 21
AGRICULTURAL LAND ............................................................................................................................................. 23
4. RECLAMATION DISTRICT SERVICES ......................................................................................................... 25
SERVICE PROVIDERS OVERVIEW ............................................................................................................................. 25
SERVICE DEMAND ................................................................................................................................................... 31
INFRASTRUCTURE NEEDS OR DEFICIENCIES ............................................................................................................ 32
SERVICE ADEQUACY ............................................................................................................................................... 34
SHARED FACILITIES ................................................................................................................................................. 39
FINANCING .............................................................................................................................................................. 39
MSR DETERMINATIONS .......................................................................................................................................... 43
5. RECLAMATION DISTRICT 799 (HOTCHKISS TRACT) ............................................................................. 47
AGENCY OVERVIEW ................................................................................................................................................ 47
RECLAMATION SERVICE .......................................................................................................................................... 54
GOVERNANCE ALTERNATIVES ................................................................................................................................. 59
AGENCY MSR DETERMINATIONS ............................................................................................................................ 59
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................... 61
6. RECLAMATION DISTRICT 800 (BYRON TRACT) ...................................................................................... 65
AGENCY OVERVIEW ................................................................................................................................................ 65
RECLAMATION SERVICE .......................................................................................................................................... 73
GOVERNANCE ALTERNATIVES ................................................................................................................................. 77
AGENCY MSR DETERMINATIONS ............................................................................................................................ 77
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................... 79
7. RECLAMATION DISTRICT 830 (JERSEY ISLAND) .................................................................................... 82
AGENCY OVERVIEW ................................................................................................................................................ 82
RECLAMATION SERVICE .......................................................................................................................................... 89
GOVERNANCE ALTERNATIVES ................................................................................................................................. 92
AGENCY MSR DETERMINATIONS ............................................................................................................................ 92
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................... 94
8. RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS) ....................................................... 96
BY BURR CONSULTING i
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
AGENCY OVERVIEW ................................................................................................................................................ 96
RECLAMATION SERVICE ........................................................................................................................................ 103
GOVERNANCE ALTERNATIVES ............................................................................................................................... 106
AGENCY MSR DETERMINATIONS .......................................................................................................................... 106
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 108
9. RECLAMATION DISTRICT 2025 (HOLLAND TRACT) ............................................................................. 110
AGENCY OVERVIEW .............................................................................................................................................. 110
RECLAMATION SERVICE ........................................................................................................................................ 116
GOVERNANCE ALTERNATIVES ............................................................................................................................... 120
AGENCY MSR DETERMINATIONS .......................................................................................................................... 121
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 122
10. RECLAMATION DISTRICT 2026 (WEBB TRACT) ................................................................................... 125
AGENCY OVERVIEW .............................................................................................................................................. 125
RECLAMATION SERVICE ........................................................................................................................................ 131
GOVERNANCE ALTERNATIVES ............................................................................................................................... 135
AGENCY MSR DETERMINATIONS .......................................................................................................................... 135
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 137
11. RECLAMATION DISTRICT 2059 (BRADFORD ISLAND) ....................................................................... 140
AGENCY OVERVIEW .............................................................................................................................................. 140
RECLAMATION SERVICE ........................................................................................................................................ 146
GOVERNANCE ALTERNATIVES ............................................................................................................................... 150
AGENCY MSR DETERMINATIONS .......................................................................................................................... 150
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 152
12. RECLAMATION DISTRICT 2065 (VEALE TRACT) ................................................................................. 154
AGENCY OVERVIEW .............................................................................................................................................. 154
RECLAMATION SERVICE ........................................................................................................................................ 159
GOVERNANCE ALTERNATIVES ............................................................................................................................... 162
AGENCY MSR DETERMINATIONS .......................................................................................................................... 162
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 164
13. RECLAMATION DISTRICT 2090 (QUIMBY ISLAND) ............................................................................. 166
AGENCY OVERVIEW .............................................................................................................................................. 166
RECLAMATION SERVICE ........................................................................................................................................ 171
GOVERNANCE ALTERNATIVES ............................................................................................................................... 174
AGENCY MSR DETERMINATIONS .......................................................................................................................... 174
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 175
14. RECLAMATION DISTRICT 2117 (CONEY ISLAND) ............................................................................... 178
AGENCY OVERVIEW .............................................................................................................................................. 178
RECLAMATION SERVICE ........................................................................................................................................ 183
GOVERNANCE ALTERNATIVES ............................................................................................................................... 186
AGENCY MSR DETERMINATIONS .......................................................................................................................... 186
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 187
15. RECLAMATION DISTRICT 2121 (BIXLER TRACT)................................................................................ 190
AGENCY OVERVIEW .............................................................................................................................................. 190
RECLAMATION SERVICE ........................................................................................................................................ 195
GOVERNANCE ALTERNATIVES ............................................................................................................................... 198
AGENCY MSR DETERMINATIONS .......................................................................................................................... 198
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 199
16. RECLAMATION DISTRICT 2122 (WINTER ISLAND) ............................................................................. 202
AGENCY OVERVIEW .............................................................................................................................................. 202
ii PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION SERVICE ........................................................................................................................................ 208
GOVERNANCE ALTERNATIVES ............................................................................................................................... 212
AGENCY MSR DETERMINATIONS .......................................................................................................................... 212
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 213
17. RECLAMATION DISTRICT 2137 ................................................................................................................. 216
AGENCY OVERVIEW .............................................................................................................................................. 216
RECLAMATION SERVICE ........................................................................................................................................ 222
GOVERNANCE ALTERNATIVES ............................................................................................................................... 224
AGENCY MSR DETERMINATIONS .......................................................................................................................... 224
SOI RECOMMENDATIONS AND DETERMINATIONS ................................................................................................. 226
18. OTHER PROVIDERS ...................................................................................................................................... 229
BETHEL ISLAND MUNICIPAL IMPROVEMENT DISTRICT .......................................................................................... 229
CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT ............................................ 231
DELTA LEVEE COALITION ..................................................................................................................................... 233
DELTA PROTECTION COMMISSION ......................................................................................................................... 234
OTHER FLOOD AND DRAINAGE PROVIDERS ........................................................................................................... 235
REFERENCES ........................................................................................................................................................ 236
DATA SOURCES ..................................................................................................................................................... 236
INTERVIEWS AND CORRESPONDENCE .................................................................................................................... 236
BY BURR CONSULTING iii
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
LIST OF TABLES
TABLE 1-1: LOCAL AGENCIES REVIEWED .................................................................................................................. 1
TABLE 1-2: RECLAMATION DISTRICT AND LEVEE SYSTEM OVERVIEW ...................................................................... 2
TABLE 1-3: SOI UPDATE RECOMMENDATIONS .......................................................................................................... 7
TABLE 2-1: COMMISSION MEMBERS, 2009................................................................................................................. 9
TABLE 3-1 LOCAL AGENCIES BY DELTA ZONE ....................................................................................................... 15
TABLE 3-2 URBAN AND AGRICULTURAL DELTA LEVEE STANDARDS ..................................................................... 21
TABLE 3-3 POPULATION, ACREAGE AND PRIMARY LAND USE BY DISTRICT ........................................................... 22
TABLE 3-4 ACRES OF FARMLAND UNDER WILLIAMSON ACT CONTRACTS ............................................................. 24
TABLE 4-1: LOCAL AGENCIES REVIEWED ................................................................................................................ 25
TABLE 4-2: LEVEE SYSTEM INFRASTRUCTURE OVERVIEW AND FLOOD RISK .......................................................... 33
TABLE 4-3: MINIMUM FEMA REQUIREMENTS FOR LEVEE STANDARDS .................................................................. 34
TABLE 4-4: LEVEE INSPECTION PRACTICES .............................................................................................................. 35
TABLE 4-5: DISTRICT STAFFING BY TYPE ................................................................................................................ 36
TABLE 4-6: MANAGEMENT PRACTICES .................................................................................................................... 37
TABLE 4-7: ACCOUNTABILITY MEASURES ............................................................................................................... 38
TABLE 5-1: RD 799 GOVERNING BODY ................................................................................................................... 50
TABLE 5-2: RD 799 RECLAMATION SERVICE FINANCING ........................................................................................ 54
TABLE 5-3: RD 799 RECLAMATION SERVICE PROFILE ............................................................................................. 58
TABLE 5-4: RD 799 SOI ANALYSIS .......................................................................................................................... 62
TABLE 6-1: RD 800 GOVERNING BODY ................................................................................................................... 67
TABLE 6-2: RD 800 RECLAMATION SERVICE FINANCING ........................................................................................ 72
TABLE 6-3: RD 800 RECLAMATION SERVICE PROFILE ............................................................................................. 76
TABLE 6-4: RD 800 SOI ANALYSIS .......................................................................................................................... 80
TABLE 7-1: RD 830 GOVERNING BODY ................................................................................................................... 84
TABLE 7-2: RD 830 RECLAMATION SERVICE FINANCING ........................................................................................ 88
TABLE 7-3: RD 830 RECLAMATION SERVICE PROFILE ............................................................................................. 91
TABLE 7-4: RD 830 SOI ANALYSIS .......................................................................................................................... 94
TABLE 8-1: RD 2024 GOVERNING BODY ................................................................................................................. 99
TABLE 8-2: RD 2024 RECLAMATION SERVICE FINANCING .................................................................................... 103
TABLE 8-3: RD 2024 RECLAMATION SERVICE PROFILE ......................................................................................... 105
TABLE 8-4: RD 2024 SOI ANALYSIS ...................................................................................................................... 109
TABLE 9-1: RD 2025 GOVERNING BODY ............................................................................................................... 112
TABLE 9-2: RD 2025 RECLAMATION SERVICE FINANCING .................................................................................... 116
TABLE 9-3: RD 2025 RECLAMATION SERVICE PROFILE ......................................................................................... 119
TABLE 9-4: RD 2025 SOI ANALYSIS ...................................................................................................................... 123
TABLE 10-1: RD 2026 GOVERNING BODY ............................................................................................................... 127
TABLE 10-2: RD 2026 RECLAMATION SERVICE FINANCING .................................................................................... 131
TABLE 10-3: RD 2026 RECLAMATION SERVICE PROFILE ......................................................................................... 134
TABLE 10-4: RD 2026 SOI ANALYSIS ...................................................................................................................... 138
TABLE 11-1: RD 2059 GOVERNING BODY ............................................................................................................... 142
TABLE 11-2: RD 2059 RECLAMATION SERVICE FINANCING .................................................................................... 146
TABLE 11-3: RD 2059 RECLAMATION SERVICE PROFILE ......................................................................................... 149
TABLE 11-4: RD 2059 SOI ANALYSIS ...................................................................................................................... 153
TABLE 12-1: RD 2065 GOVERNING BODY ............................................................................................................... 156
TABLE 12-2: RD 2065 RECLAMATION SERVICE FINANCING .................................................................................... 159
TABLE 12-3: RD 2065 RECLAMATION SERVICE PROFILE ......................................................................................... 161
TABLE 12-4: RD 2065 SOI ANALYSIS ...................................................................................................................... 165
TABLE 13-1: RD 2090 GOVERNING BODY ............................................................................................................... 168
TABLE 13-2: RD 2090 RECLAMATION SERVICE FINANCING .................................................................................... 171
TABLE 13-3: RD 2090 RECLAMATION SERVICE PROFILE ......................................................................................... 173
TABLE 13-4: RD 2090 SOI ANALYSIS ...................................................................................................................... 176
TABLE 14-1: RD 2117 GOVERNING BODY ............................................................................................................... 179
TABLE 14-2: RD 2117 RECLAMATION SERVICE FINANCING .................................................................................... 183
iv PREPARED FOR CONTRA COSTA LAFCO
TABLE 14-3: RD 2117 RECLAMATION SERVICE PROFILE ......................................................................................... 185
TABLE 14-4: RD 2117 SOI ANALYSIS ...................................................................................................................... 188
TABLE 15-1: RD 2121 GOVERNING BODY ............................................................................................................... 193
TABLE 15-2: RD 2121 RECLAMATION SERVICE FINANCING .................................................................................... 195
TABLE 15-3: RD 2121 RECLAMATION SERVICE PROFILE ......................................................................................... 197
TABLE 15-4: RD 2121 SOI ANALYSIS ...................................................................................................................... 200
TABLE 16-1: RD 2122 GOVERNING BODY ............................................................................................................... 204
TABLE 16-2: RD 2122 RECLAMATION SERVICE FINANCING .................................................................................... 208
TABLE 16-3: RD 2122 RECLAMATION SERVICE PROFILE ......................................................................................... 211
TABLE 16-4: RD 2122 SOI ANALYSIS ...................................................................................................................... 214
TABLE 17-1: RD 2137 GOVERNING BODY ............................................................................................................... 218
TABLE 17-2: RD 2137 RECLAMATION SERVICE FINANCING .................................................................................... 221
TABLE 17-3: RD 2137 RECLAMATION SERVICE PROFILE ......................................................................................... 223
TABLE 17-4: RD 2137 SOI ANALYSIS ...................................................................................................................... 227
TABLE 18-1: ACTIVE FCZ IN CONTRA COSTA COUNTY ........................................................................................... 232
BY BURR CONSULTING v
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
LIST OF FIGURES
FIGURE 3-1 FARMLAND ACREAGE ESTIMATES BY DISTRICT AND TYPE ................................................................... 23
FIGURE 4-1: MAINTENANCE COSTS PER LEVEE MILE (IN THOUSANDS), FY 07-08 .................................................... 41
FIGURE 4-2: REHABILITATION COST PER LEVEE MILE (IN THOUSANDS), FY 07-08 ................................................... 42
FIGURE 4-3: AVERAGE LOCAL REVENUE PER LEVEE MILE, FY 04-05 TO FY 07-08 ................................................. 42
FIGURE 4-4: AVERAGE STATE ASSISTANCE PER LEVEE MILE, FY 04-05 TO FY 07-08 .............................................. 43
FIGURE 5-1: RD 799 EXPENDITURES, FY 04-05 THROUGH FY 07-08 ........................................................................ 52
FIGURE 5-2: RD 799 DUTCH SLOUGH LEVEE ............................................................................................................ 56
FIGURE 6-1: RD 800 EXPENDITURES, FY 04-05 THROUGH FY 07-08 ........................................................................ 70
FIGURE 6-2: RD 800 AGRICULTURAL LEVEE ............................................................................................................ 74
FIGURE 6-3: RD 800 FEMA URBAN LEVEE .............................................................................................................. 74
FIGURE 7-1: RD 830 EXPENDITURES, FY 04-05 THROUGH FY 07-08 ........................................................................ 87
FIGURE 7-2: RD 830 TAYLOR SLOUGH LEVEE .......................................................................................................... 90
FIGURE 8-1: RD 2024 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 102
FIGURE 8-2: RD 2024 INDIAN SLOUGH LEVEE ........................................................................................................ 104
FIGURE 9-1: RD 2025 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 114
FIGURE 9-2: RD 2025 ROCK SLOUGH LEVEE .......................................................................................................... 117
FIGURE 10-1: RD 2026 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 130
FIGURE 11-1: RD 2059 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 144
FIGURE 11-2: RD 2059 LEVEE CRACK ...................................................................................................................... 148
FIGURE 12-1: RD 2065 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 158
FIGURE 12-2: RD 2065 ROCK SLOUGH LEVEE .......................................................................................................... 160
FIGURE 13-1: RD 2090 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 170
FIGURE 14-1: RD 2117 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 182
FIGURE 14-2: RD 2117 OLD RIVER LEVEE ................................................................................................................ 184
FIGURE 15-1: RD 2121 WERNER DREDGER CUT LEVEE ............................................................................................ 196
FIGURE 16-1: RD 2122 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 206
FIGURE 16-2: RD 2122 MIDDLE SLOUGH LEVEE ....................................................................................................... 210
FIGURE 17-1: RD 2137 EXPENDITURES, FY 04-05 THROUGH FY 07-08 .................................................................... 220
LIST OF MAPS
MAP 1-1 RECLAMATION DISTRICT OVERVIEW ............................................................................................................ 3
MAP 4-1 RECLAMATION DISTRICT OVERVIEW .......................................................................................................... 26
MAP 5-1: RD 799 BOUNDARY AND COTERMINOUS SOI ............................................................................................. 48
MAP 6-1: RD 800 BOUNDARY AND COTERMINOUS SOI ............................................................................................. 66
MAP 7-1: RD 830 BOUNDARY AND COTERMINOUS SOI ............................................................................................. 83
MAP 8-1: RD 2024 BOUNDARY AND COTERMINOUS SOI ........................................................................................... 98
MAP 9-1: RD 2025 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 111
MAP 10-1: RD 2026 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 126
MAP 11-1: RD 2059 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 141
MAP 12-1: RD 2065 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 155
MAP 13-1: RD 2090 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 167
MAP 14-1: RD 2117 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 180
MAP 15-1: RD 2121 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 191
MAP 16-1: RD 2122 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 203
MAP 17-1: RD 2137 BOUNDARY AND COTERMINOUS SOI ......................................................................................... 217
vi PREPARED FOR CONTRA COSTA LAFCO
A C R O N Y M S
BOE: State Board of Equalization
CEQA: California Environmental Quality Act
Corps: U.S. Army Corps of Engineers
DOF: California Department of Finance
DPC: Delta Protection Commission
DFG: California Department of Fish and Game
DWR: California Department of Water Resources
EBMUD: East Bay Municipal Utility District
FEMA: Federal Emergency Management Agency
FIRM: Flood Insurance Rate Map
FY: Fiscal year
HMP: Hazard Mitigation Plan
ISD: Ironhouse Sanitary District
JPA: Joint Powers Authority
LAFCO: Local Agency Formation Commission
MSR: Municipal Service Review
NA: Not applicable
NP: Not provided
NR: Not reported
NPDES: National Pollutant Discharge Elimination System
RD: Reclamation District
RWQCB: Regional Water Quality Control Board
SOI: Sphere of influence
USGS: United States Geological Survey
WWTP : Wastewater treatment plant
BY BURR CONSULTING vii
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
P R E FA C E
Prepared for the Contra Costa Local Agency Formation Commission (LAFCO), this report is a
municipal service review—a state-required comprehensive study of services within a designated
geographic area. This MSR focuses on local agencies and other municipal service providers
providing reclamation services in Contra Costa County.
CONTEXT
Contra Costa LAFCO is required to prepare this MSR by the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000 (Government Code §56000, et seq.), which took effect on
January 1, 2001. The MSR reviews services provided by public agencies—cities and special
districts—whose boundaries and governance are subject to LAFCO. In order to provide
comprehensive information on service provision, other service providers—private companies and
public agencies which are not subject to LAFCO—are included in this MSR.
CREDITS
The authors extend their appreciation to those individuals at many agencies that provided
planning and financial information and documents used in this report. The contributors are listed
individually at the end of this report.
Contra Costa LAFCO Executive Officer, Lou Ann Texeira, provided project direction and
review. Credit for archival review and organization undertaking belongs to Lou Ann Texeira and
her team, including LAFCO clerk Kate Sibley, County GIS staff Chris Howard, and consultant
Alexander Hebert-Brown. Heather Kennedy and Chris Howard of the Contra Costa County
Information Technology Department prepared maps and conducted GIS analysis.
This report was prepared by Burr Consulting, in conjunction with Baracco & Associates. Bruce
Baracco and Alexander Hebert-Brown served as principal authors.
viii PREPARED FOR CONTRA COSTA LAFCO
EXECUTIVE SUMMARY
1. E X E C U T I V E S U M M A RY
This report is a countywide Municipal Service Review (MSR) of reclamation districts, prepared
for the Contra Costa Local Agency Formation Commission (LAFCO). An MSR is a State-required
comprehensive study of services within a designated geographic area, in this case, Contra Costa
County. The MSR requirement is codified in the Cortese-Knox-Hertzberg Local Government
Reorganization Act of 2000 (Government Code Section 56000 et seq.). Once MSR findings are
adopted, the Commission will update the spheres of influence (SOIs) of reclamation districts in
Contra Costa County. This report identifies and analyzes SOI options for the Commission’s
consideration.
SERVICE PROVIDERS
Table 1-1: Local Agencies Reviewed
This report focuses on
those special districts that
provide levee maintenance and
rehabilitation services in Contra
Costa County and are under
LAFCO jurisdiction, as shown
in Table 1-1. District Name
RD 799 Hotchkiss Tract ● ● ● ● ● ● ● ● ●
This report is the sole MSR RD 800 Byron Tract ● ● ● ● ● ● ● ● ●
in this cycle for each of the 13 RD 830 Jersey Island ○ ○ ○ ○ ○ ○ ○ ○ ○
reclamation districts (RDs); RD 2024 Orwood/Palm Tract ∆ ∆ ∆ ∆ ∆ ∆ ∆ ∆ ∆
LAFCO will update these RD 2025 Holland Tract ○ ○ ○ ○ ○ ○ ○ ○ ○
agencies’ spheres of influence RD 2026 Webb Tract ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
(SOIs) at the completion of this RD 2059 Bradford Island ● ● ● ● ● ● ● ● ● ○
review. RD 2065 Veale Tract ● ● ● ● ● ● ∆ ● ●
RD 2090 Quimby Island ○ ∆ ○ ○ ○ ○ ○ ∆ ∆
Bethel Island Municipal RD 2117 Coney Island ○ ○ ○ ○ ○ ○ ○ ∆ ∆
Improvement District (BIMID) RD 2121 Bixler Tract ○ ∆ ○ ○ ○ ○ ○ ∆ ∆
also provides levee maintenance RD 2122 Winter Island ● ● ● ● ● ● ○ ● ●
and rehabilitation services in the RD 2137 ○ ○ ○ ○ ○ ○ ○ ● ∆
County, but was reviewed in a Key:
separate sub-regional MSR ● indicates service provided directly by agency
adopted by the Commission in ○ indicates service provided by contract with another service provider
December 2008. ∆ indicates service provided directly by agency and by contract with another provider
INFRASTRUCTURE AND SERVICE ADEQUACY
In response to significant flood events in the early 1980s, the Federal Emergency Management
Agency (FEMA), the U.S. Army Corps of Engineers (Corps) and the State of California’s
Department of Water Resources (DWR) set new standards for non-project levees in the Delta.
FEMA set a short-term Hazard Mitigation Plan (HMP) standard as an interim goal, with the long-
term goal of upgrading all levees to the U.S. Army Corps of Engineers’ Public Law (PL) 84-99
BY BURR CONSULTING 1
ecnanetniaM
eeveL
lortnoC
doolF
eganiarD
lanretnI
.tniaM
daoR
eeveL
tnemetabA
deeW
noitcetorP
epolS
lortnoC
tnedoR
lortaP
eeveL
gnithgiF
doolF
ecivreS
yrreF
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
standard. DWR Bulletin 192-82 standards were established for work done through the DWR
Special Flood Control Projects Unit, and are the most stringent standard used to classify Delta
levees.
As an incentive for districts to upgrade levees, FEMA made the HMP standard a precondition
to receiving disaster assistance for a levee breach after September 10, 1991. Reclamation districts
not in compliance with this deadline are subject to denial of disaster assistance from FEMA. The
HMP standard was not intended to be a long-term standard for the Delta, and is generally not
considered an adequate standard to avoid flooding. None of the agricultural Delta levee standards
(HMP, PL 84-99 or Bulletin 192-82) provide significant seismic capability, and none are considered
to provide 100-year flood protection. Urban levee standards are achieved by FEMA 100-year and
200-year flood protection levees, as well as the Bulletin 192-82 urban standard. See Table 3-1 for
more details on levee standards and specifications.
Table 1-2: Reclamation District and Levee System Overview
Levee Surface Base Flood
District Name Miles Levee Standard1 Elevation Elevation
RD 799 Hotchkiss Tract 11.7 3.2 mi. at FEMA -5 to 5 ft. 7 ft.
5.2 mi. at HMP
3.3 mi. below HMP
RD 800 Byron Tract 18.9 9.2 mi. at FEMA -4 to 13 ft. < 1 ft.
9.7 mi. at PL-99
RD 830 Jersey Island 16.0 6.3 mi. at HMP 0 to -15 ft. 7 ft.
9.7 mi. below HMP
RD 2024 Orwood/Palm 14.6 14.6 mi. at HMP 0 to -15 ft. 8 ft. (Orwood)
Tracts 7 ft. (Palm)
RD 2025 Holland Tract 11.0 11.0 mi. at HMP 0 to -15 ft. 7 ft.
RD 2026 Webb Tract 12.9 12.9 mi. at HMP -5 to -20 ft. 7 ft.
RD 2059 Bradford Island 7.5 4.0 mi. at HMP -5 to -15 ft. 7 ft.
3.5 mi. below HMP
RD 2065 Veale Tract 5.1 4.2 mi. at HMP -4 to 2 ft. 7 ft.
0.9 mi. below HMP
RD 2090 Quimby Island 7.0 7.0 mi. at HMP -5 to -11 ft. 7 ft.
RD 2117 Coney Island 5.4 5.4 mi. at HMP -5 to -10 ft. 8 ft.
RD 2121 Bixler Tract 2.0 2.0 mi. below HMP -2 to 14 ft. 7 ft.
RD 2122 Winter Island 5.0 3.5 mi. at HMP 0 to 10 ft. 7 ft.
1.5 mi. below HMP
RD 2137 3.8 3.0 mi. at HMP -10 to 10 ft. 7 ft.
0.8 mi. below HMP
Note:
(1) HMP standard is the minimum standard for levee protection in the Delta. Districts must meet at least
HMP standard to be eligible for FEMA disaster assistance funding.
NR = Not reported. The repair after levee failure scenario was not modeled for all districts.
2 PREPARED FOR CONTRA COSTA LAFCO
Map 1-1
Contra Costa County Reclamation Districts - Boundaries and Coterminous SOI
Solano Mokelumne River
Solano Solano County
County CSoaucnratymento River
Sacramento River
Suisun Sacramento Potato
Bay County Slough
2026
2059
Middle Slough212S2acramento
Pittsburg County
Marina Contra Costa
E 3rd St County
New York Slough
Harbor St
E 14th
St
San Joaquin River
W 4th St
Franks
Tract
830
San Joaquin River BBeetthheell IIssllaanndd
ÄÅ
2090
160
Big
Break
Wilbur Ave
E 18th St ÄÅ
160 2137
Hillc
ÄÅ
r
4
est
Ave
Neroly
Rd
mpire
Ave
Ohara
Ave
Ohara
Ave
E Cypress Rd
OO
7
aa
9
kk
9
lleeyy
2025 Old River
E
AAnnttiioocchh
Neroly
Rd
Ohara
Ave
Delta Rd
KKnniigghhttsseenn
San
C o
J
u
o
n
a
t
q
y
uin
Way Lone Tree W 1
St
ay 2065 Middle River
Jeffery
Sunset Rd
Contra Costa 2121
County
BBrree
C
nn
entr
t
a
t
l B
ww
lvd
oo
Dain
oo
ty A
d
v
d
e Oak St Chestnut St
Byron
Hwy 2024
Balfour Rd
Deer
Valley
Rd
Concord
Ave
John
Muir
Pkwy
Concor
Walnut
Blvd
d Ave
Sellers
Ave
DDiissccoovv
D
ee
is
B
c
rr
o
a
y
v
y
y
er y
BBaayy
Marsh Creek Rd
ÄÅ
Marsh Creek 4
Reservoir
evA
llewgnoL
Vasco
Rd
BByyrroonn
800
Camino Diablo
City Boundaries
Urban Limit Line
Byron
Hwy
2117
Reclamation Districts
Clifton Court
Forebay
County Bnd
Los Vaqueros
Reservoir
®
65by1 CPionnet rSa tCreoest,t 3 a47 tC :h5 o 9F Mu :l4 no a 8 tp oy . r4 c CN5 roe 5oma Nr t thme 1 d Wu 2 n5 2ii/ nt1 : yg0 8 ,6 D /2 M:3 e0 a5 v0er. 9 3tlion8 pe4 m Wz,e CnAt, G94IS55 G3r-o0u09p5 a b Trea hasD is se i e t . sm vd e W c a a lt up oah r p r , ci C l m e ep o on r n e o u i t m t n b n as Tt la t it i h y na g Dr i st s ia o le e y t f c p m e io C Cf a d a pt ri o t h pt ty ym o ne r w t i L r e ugsa a in sh m o st et Cu e i wc t ro td s c h ri, s e e t ii h t sn i a a s ifs td d o e d d a arc d e i m s t t i a ar t b ce i a v l yf t da t er h i o o.i t de m h U m n e fC e s r a o r t o e Ch n m o u r eo dsf n n tC l mt o t i hy a r f oe a a b a t n y hi C C s l t ii r ns st Aao y uo s m C f Smt t o a ba to e r a ep sC s g t te aa o e a n lg u o B to C erg n o e r o r t r aeee y a ursd p nC d t p.oh t oy oo i I cr n m f te G s i E ma m n I ibqS df a u o ui yl a nP i r at m y n i b rl t io d y z e a f g o a tar i r rt o ec a io n ipc t mns . reo '. p sa d S t ct u ao c thcuxm ee rre da a ct inye. 0 1 2 4 Miles
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
INFRASTRUCTURE NEEDS
Contra Costa reclamation districts face significant flood risk, but many would not even qualify
for FEMA disaster assistance following a levee failure (due to non-compliance with HMP
standards). None of the reclamation districts provide 100-year flood protection, with the exception
of portions of levees maintained by RD 799 and RD 800 at FEMA 100-year flood standards.
Seven of the 13 reclamation districts have levees below HMP standards, nearly all reclamation
districts have portions of the land surface below sea level, and all but one district are within the
FEMA 100-year floodplain (RD 800 is between the 100-year and 500-year flood level), as shown in
Table 1-2. Of the nearly 121 miles of levees maintained by the 13 reclamation districts, nearly 18
percent (approximately 22 miles) are at less than the minimum (HMP) standard, and nearly 82
percent (approximately 99 miles) require rehabilitation to achieve the PL 84-99 standard.
Comprehensive, long-term capital improvement strategies are necessary to adequately plan for
proper levee care, and properly balance the tradeoff between the level of protection provided by the
levee system with the uses of land and water enabled by the levee system.1 From a purely economic
standpoint, it will likely not be cost effective to repair some islands when their levees fail.2 As
subsidence proceeds and sea levels rise, optimal infrastructure strategies need reevaluation.
Water Code §12311 identifies protecting Bethel Island, Bradford Island, Holland Tract,
Hotchkiss Tract, Jersey Island and Webb Tract as a priority. DWR gives priority to these western
Delta islands for funding via the special projects program, as these islands have been determined to
be critical to control of salinity in the Delta, protecting water quality to all water users in the state.
Of these six islands, five are protected by reclamation districts, and one is protected by a municipal
improvement district (Bethel Island Municipal Improvement District).
Although levee systems and related facilities are distinct entities on each island that cannot be
shared, proper levee maintenance provides indirect benefits outside of district bounds. Because
inundation of one or more islands would increase the effects of wind and wave erosion on
neighboring levees, it is in the interest of all districts to ensure that the integrity of the levees be
maintained and that infrastructure needs continue to be addressed.
FINANCING
Levee Maintenance
Routine levee maintenance expenditures are primarily financed by landowner assessments and
subventions reimbursements from DWR.
Up to 75 percent of levee maintenance costs for Delta reclamation districts may be reimbursed
each year through the DWR subventions program for districts that meet certain qualifications for
eligibility and submit applications. However, the State program is not fully funded. In typical years,
1 Delta Vision Strategic Plan, October 2008, p. 37.
2 Public Policy Institute of California, Levee Decisions and Sustainability for the Delta Technical Appendix B, 2008, p. 31.
4 PREPARED FOR CONTRA COSTA LAFCO
EXECUTIVE SUMMARY
local agencies throughout the Delta requested an average of $50 million in subventions
reimbursements, but the State only had around $6 million to award.3 In addition, the State makes
$15-$20 million per year available for subventions-eligible projects in the Delta.4 In other words,
there is a shortfall of $24-29 million. Funds are too limited for all Delta levees to be equally
subsidized by the State. Additional planning at the State level is needed to properly prioritize and
allocate levee maintenance and rehabilitation funds to match areas where funds are needed most.
Levee Rehabilitation
Due to the significant expense associated with levee improvements, reclamation districts in
Contra Costa County could not afford to rehabilitate levees without support from DWR. Funding
for significant levee improvement projects comes primarily from DWR’s Delta Levee Special Flood
Control Projects (special projects) program.
The special projects program was originally established to address flooding on the eight western
Delta islands of Bethel, Bradford, Holland, Hotchkiss, Jersey, Sherman, Twitchell, Webb, and the
towns of Thornton, New Hope, and Walnut Grove. In 1996, the program was expanded to the
entire Delta and to portions of the Suisun Marsh. In total, the project has funded over $200 million
in flood control and habitat projects in the Delta, with future funding significantly increased by the
Proposition 1E and 84 bonds. For FY 08-09, DWR will have $31 million available to fund special
projects in the Delta via a competitive application process.
POLICY OPTIONS
The report identifies and describes various policy options for the Commission to consider as it
updates the spheres of influence of the reclamation districts, including the following:
• Transferring responsibility for flood protection from Bethel Island Municipal
Improvement District to RD 799 (Hotchkiss Tract) is an option due to the proximity
and similar land use bases of the districts.
• Annexation of an 80-acre agricultural parcel on the west side of RD 800 (Byron Tract)
that is within the dry land levee, but outside the District boundary; and detaching a 200-
acre agricultural parcel outside the levee system adjacent to Byron Highway and Clifton
Court Road.
• Annexation of the proposed Pantages Bays residential project (292 single-family
dwellings) to RD 800 is an option that would likely be a development condition and
project requirement.
• Transferring responsibility for flood protection from Discovery Bay Community
Services District to RD 800 is an option. With LAFCO approval of DBCSD’s requests
3 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 35.
4 Proposition 1E is a 10-year bond, and all funds must be used by FY 15-16. Proposition 84 is a five-year bond, although funding
may be spent after the expiration of the bond in FY 10-11.
BY BURR CONSULTING 5
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
in 2002 and 2003 to provide construction and operation of flood protection works and
facilities, there are now similar services being provided by RD 800 and DBCSD.
• The Discovery Bay Drainage and Maintenance District currently operates under the
umbrella of RD 800. An alternative approach would be to consolidate the Discovery
Bay Drainage and Maintenance District into RD 800.
• Consolidation of RD 2024 (Palm/Orwood Tract) with RD 2065 (Veale Tract) is an
option. As RD 2024 is the larger and financially healthier of the districts, it would be
logical for RD 2024 to be the successor agency and for RD 2065 to annex to RD 2024.
• Consolidation of RD 2025 (Holland Tract) and RD 2026 (Webb Tract) in Contra Costa
County with RD 759 (Bouldin Island) and RD 2028 (Bacon Island) in San Joaquin
County was identified as an option, due to the long-term vision of the majority
landowner to operate Bacon Island and Webb Tract as water storage facilities and
Holland Tract and Bouldin Island as habitat mitigation sites.
• Consolidation of RD 2059 (Bradford Island) with RD 2026 (Webb Tract) was identified
as an option due to the proximity of RD 2026 (to the east), and the remote nature of
both Districts (both islands rely on the ferry from Jersey Island for vehicular access).
• Annexation of properties to the west of RD 2065 that benefit from District drainage
and/or flood control services. Assessments would be levied on such properties in
proportion to the benefits received from either or both services.
• Options identified for RD 2090 (Quimby Island) and RD 2117 (Coney Island) include
reorganization of these areas in the event of a future levee failure. If the levee system
were to fail and the islands became inundated, an option would be to dissolve the district
and annex the area to an adjacent reclamation district.
• Dissolution of RD 2121 (Bixler Tract) was identified an option. It does not appear that
the landowner considers the District to be a needed public agency, and appears that the
District could be dissolved and the levee maintenance responsibilities be formally made
the responsibility of the landowner. RD 2121 does not receive funds from DWR
subventions to finance levee maintenance or rehabilitation activities, and the landowner
did not identify any strategic value of reclaiming its lands with respect to impact on the
Delta. Furthermore, the District does not file financial statements with the State
Controller and the District Manager reported that the District is inactive.
• Dissolution of RD 2137 was identified an option. RD 2137 land is primarily owned by
DWR and is within the City of Oakley city limits. Restoration of the tract as part of the
Dutch Slough Tidal Marsh Restoration Project, along with any necessary new levee
construction or repair and maintenance of existing levees could become the
responsibility of the State of California or the City of Oakley (or both). Construction of
a new setback levee (along Jersey Island Road) could be financed by new urban
development along the East Cypress Corridor Specific Plan area, which would provide
FEMA 100-year flood protection to the new development, and separate and protect the
habitat/tidal marsh restoration area closer to Dutch Slough.
6 PREPARED FOR CONTRA COSTA LAFCO
EXECUTIVE SUMMARY
• Consolidation of RD 2137 with the adjacent RD 799 was also identified as an option. A
436-acre portion of the Dutch Slough Tidal Marsh Restoration Project area (Burroughs
Parcel) is located within RD 799. Under this option, RD 2137 would be dissolved and
the area annexed to RD 799. This would place all of the Restoration Project area within
a single reclamation district. A variation of this option would be to detach the
Burroughs Parcel from RD 799 and annex that territory to RD 2137. This option would
require the construction of the Jersey Island Road setback levee if existing levees within
RD 2137 are breached for marshland restoration.
SOI UPDATES
This report identifies alternatives for LAFCO to consider as it updates the spheres of influence
(SOIs) of the 13 reclamation districts, and offers preliminary recommendations. An SOI is a
LAFCO-approved plan that designates an agency’s probable future boundary and service area. The
SOI essentially defines where and what types of government reorganizations, such as annexation,
detachment, dissolution or consolidation, may be initiated. The governing bodies of local agencies
and voters may initiate reorganizations so long as they are consistent with the SOIs. An SOI change
neither initiates nor approves a government reorganization. If and when a government
reorganization is initiated, there are procedural steps required by law, including a protest hearing
and/or election by which voters may choose to approve or disapprove a reorganization.
The existing SOI for all 13 reclamation districts is coterminous with district bounds. The
consultants’ SOI recommendations are shown in Table 1-3.
Table 1-3: SOI Update Recommendations
District Name Recommendation
RD 799 Hotchkiss Tract SOI reduction in the western portion of the District, between Jersey
Island Road and Little Dutch Slough, to remove parcel in the Dutch
Slough Tidal Marsh Restoration Project area.
RD 800 Byron Tract SOI expansion to include an 80-acre parcel where District provides
service outside bounds, and SOI reduction in the area of a 200-acre
parcel that does not receive District services.
RD 830 Jersey Island Retain existing coterminous SOI.
RD 2024 Orwood/Palm Retain existing coterminous SOI.
Tracts
RD 2025 Holland Tract Retain existing coterminous SOI.
RD 2026 Webb Tract Retain existing coterminous SOI.
RD 2059 Bradford Island Retain existing coterminous SOI.
RD 2065 Veale Tract Retain existing coterminous SOI and require the District to explore
expansion of SOI/boundary to the west. RD 2065 is required to
report back to LAFCO within 12 months regarding status.
RD 2090 Quimby Island Retain existing coterminous SOI.
RD 2117 Coney Island Retain existing coterminous SOI.
RD 2121 Bixler Tract Zero SOI to allow dissolution to be initiated.
RD 2122 Winter Island Retain existing coterminous SOI.
RD 2137 Zero SOI to allow dissolution to be initiated.
BY BURR CONSULTING 7
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
2. L A F C O A N D M U N I C I PA L S E RV I C E
R E V I E W S
This report is prepared pursuant to legislation enacted in 2000 that requires LAFCO to conduct
a comprehensive review of municipal service delivery and update the spheres of influence (SOIs) of
all agencies under LAFCO’s jurisdiction. This chapter provides an overview of LAFCO’s history,
powers and responsibilities. It discusses the origins and legal requirements for preparation of the
municipal service review (MSR). Finally, the chapter reviews the process for MSR review, MSR
approval and SOI updates.
LAFCO OVERVIEW
After World War II, California experienced dramatic growth in population and economic
development. With this boom came a demand for housing, jobs and public services. To
accommodate this demand, many new local government agencies were formed, often with little
forethought as to the ultimate governance structures in a given region, and existing agencies often
competed for expansion areas. The lack of coordination and adequate planning led to a multitude of
overlapping, inefficient jurisdictional and service boundaries, and the premature conversion of
California’s agricultural and open-space lands.
Recognizing this problem, in 1959, Governor Edmund G. Brown, Sr. appointed the
Commission on Metropolitan Area Problems. The Commission's charge was to study and make
recommendations on the “misuse of land resources” and the growing complexity of local
governmental jurisdictions. The Commission's recommendations on local governmental
reorganization were introduced in the Legislature in 1963, resulting in the creation of a Local Agency
Formation Commission, or LAFCO.
The Contra Costa LAFCO was formed as a countywide agency to discourage urban sprawl and
encourage the orderly formation and development of local government agencies. LAFCO is
responsible for coordinating logical and timely changes in local governmental boundaries, including
annexations and detachments of territory, incorporations of cities, formations of special districts,
and consolidations, mergers and dissolutions of districts, as well as reviewing ways to reorganize,
simplify, and streamline governmental structure. The Commission's efforts are focused on ensuring
that services are provided efficiently and economically while agricultural and open-space lands are
protected. To better inform itself and the community as it seeks to exercise its charge, LAFCO
conducts service reviews to evaluate the provision of municipal services within the County.
LAFCO regulates, through approval, denial, conditions and modification, boundary changes
proposed by public agencies or individuals. It also regulates the extension of public services by cities
and special districts outside their boundaries. LAFCO is empowered to initiate updates to the SOIs
and proposals involving the dissolution or consolidation of special districts, mergers, establishment
of subsidiary districts, formation of a new district or districts, and any reorganization including such
actions. Otherwise, LAFCO actions must originate as petitions or resolutions from affected voters,
landowners, cities or districts.
8 PREPARED FOR CONTRA COSTA LAFCO
LAFCO AND MUNICIPAL SERVICE REVIEWS
Contra Costa LAFCO consists of seven regular members: two members from the Contra Costa
County Board of Supervisors, two city council members, two independent special district members,
and one public member who is appointed by the other members of the Commission. There is an
alternate in each category. All Commissioners are appointed to four-year terms. The Commission
members are shown in Table 2-1.
Table 2-1: Commission Members, 2009
Appointing Agency Members Alternate Members
Two members from the Board of Supervisors Federal Glover Mary N. Piepho
appointed by the Board of Supervisors. Gayle Uilkema
Two members representing the cities in the County. Helen Allen, City of Concord Don Tatzin
Must be a city officer and appointed by the City Rob Schroder, City of Martinez City of Lafayette
Selection Committee.
Two members representing the independent special Dwight Meadows, Contra Costa George H. Schmidt,
districts in the County. Must be a district governing Resource Conservation Dist. West County Wastewater Dist.
body member and appointed by the independent David A. Piepho, Discovery Bay
special district selection committee. Community Services Dist.
One member from the general public appointed by Martin McNair Vacant
the other six Commissioners.
MUNICIPAL SERVICE REVIEW ORIGINS
The MSR requirement was enacted by the Legislature months after the release of two studies
recommending that LAFCOs conduct reviews of local agencies. The “Little Hoover Commission”
focused on the need for oversight and consolidation of special districts, whereas the “Commission
on Local Governance for the 21st Century” focused on the need for regional planning to ensure
adequate and efficient local governmental services as the California population continues to grow.
LITTLE HOOVER COMMISSION
In May 2000, the Little Hoover Commission released a report entitled Special Districts: Relics of the
Past or Resources for the Future? This report focused on governance and financial challenges among
independent special districts, and the barriers to LAFCO’s pursuit of district consolidation and
dissolution. The report raised the concern that “the underlying patchwork of special district
governments has become unnecessarily redundant, inefficient and unaccountable.”5
In particular, the report raised concern about a lack of visibility and accountability among some
independent special districts. The report indicated that many special districts hold excessive reserve
funds and some receive questionable property tax revenue. The report expressed concern about the
lack of financial oversight of the districts. It asserted that financial reporting by special districts is
inadequate, that districts are not required to submit financial information to local elected officials,
and concluded that district financial information is “largely meaningless as a tool to evaluate the
5 Little Hoover Commission, 2000, p. 12.
BY BURR CONSULTING 9
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
effectiveness and efficiency of services provided by districts, or to make comparisons with
neighboring districts or services provided through a city or county.”6
The report questioned the accountability and relevance of certain special districts with
uncontested elections and without adequate notice of public meetings. In addition to concerns about
the accountability and visibility of special districts, the report raised concerns about special districts
with outdated boundaries and outdated missions. The report questioned the public benefit provided
by health care districts that have sold, leased or closed their hospitals, and asserted that LAFCOs
consistently fail to examine whether they should be eliminated. The report pointed to service
improvements and cost reductions associated with special district consolidations, but asserted that
LAFCOs have generally failed to pursue special district reorganizations.
The report called on the Legislature to increase the oversight of special districts by mandating
that LAFCOs identify service duplications and study reorganization alternatives when service
duplications are identified, when a district appears insolvent, when district reserves are excessive,
when rate inequities surface, when a district’s mission changes, when a new city incorporates and
when service levels are unsatisfactory. To accomplish this, the report recommended that the State
strengthen the independence and funding of LAFCOs, require districts to report to their respective
LAFCO, and require LAFCOs to study service duplications.
COMMISSION ON LOCAL GOVERNANCE FOR THE 21ST CENTURY
The Legislature formed the Commission on Local Governance for the 21st Century (“21st
Century Commission”) in 1997 to review statutes on the policies, criteria, procedures and precedents
for city, county and special district boundary changes. After conducting extensive research and
holding 25 days of public hearings throughout the State at which it heard from over 160
organizations and individuals, the 21st Century Commission released its final report, Growth Within
Bounds: Planning California Governance for the 21st Century, in January 2000.7 The report examines the
way that government is organized and operates and establishes a vision of how the State will grow
by “making better use of the often invisible LAFCOs in each county.”
The report points to the expectation that California’s population will double over the first four
decades of the 21st Century, and raises concern that our government institutions were designed
when our population was much smaller and our society was less complex. The report warns that
without a strategy open spaces will be swallowed up, expensive freeway extensions will be needed,
job centers will become farther removed from housing, and this will lead to longer commutes,
increased pollution and more stressful lives. Growth Within Bounds acknowledges that local
governments face unprecedented challenges in their ability to finance service delivery since voters
cut property tax revenues in 1978 and the Legislature shifted property tax revenues from local
government to schools in 1993. The report asserts that these financial strains have created
governmental entrepreneurism in which agencies compete for sales tax revenue and market share.
6 Little Hoover Commission, 2000, p. 24.
7 The Commission on Local Governance for the 21st Century ceased to exist on July 1, 2000, pursuant to a statutory sunset provision.
10 PREPARED FOR CONTRA COSTA LAFCO
LAFCO AND MUNICIPAL SERVICE REVIEWS
The 21st Century Commission recommended that effective, efficient and easily understandable
government be encouraged. In accomplishing this, the 21st Century Commission recommended
consolidation of small, inefficient or overlapping providers, transparency of municipal service
delivery to the people, and accountability of municipal service providers. The sheer number of
special districts, the report asserts, “has provoked controversy, including several legislative attempts
to initiate district consolidations,”8 but cautions LAFCOs that decisions to consolidate districts
should focus on the adequacy of services, not on the number of districts.
Growth Within Bounds stated that LAFCOs cannot achieve their fundamental purposes without a
comprehensive knowledge of the services available within its county, the current efficiency of
providing service within various areas of the county, future needs for each service, and expansion
capacity of each service provider. Comprehensive knowledge of water and sanitary providers, the
report argued, would promote consolidations of water and sanitary districts, reduce water costs and
promote a more comprehensive approach to the use of water resources. Further, the report asserted
that many LAFCOs lack such knowledge and should be required to conduct such a review to ensure
that municipal services are logically extended to meet California’s future growth and development.
MSRs would require LAFCO to look broadly at all agencies within a geographic region that
provide a particular municipal service and to examine consolidation or reorganization of service
providers. The 21st Century Commission recommended that the review include water, wastewater,
and other municipal services that LAFCO judges to be important to future growth. The
Commission recommended that the service review be followed by consolidation studies and be
performed in conjunction with updates of SOIs. The recommendation was that service reviews be
designed to make nine determinations, each of which was incorporated verbatim in the subsequently
adopted legislation. The legislature since consolidated the determinations into six required findings.
MUNICIPAL SERVICE REVIEW LEGISLATION
The Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000 requires LAFCO
review and update SOIs not less than every five years and to review municipal services before
updating SOIs. The requirement for service reviews arises from the identified need for a more
coordinated and efficient public service structure to support California’s anticipated growth. The
service review provides LAFCO with a tool to study existing and future public service conditions
comprehensively and to evaluate organizational options for accommodating growth, preventing
urban sprawl, and ensuring that critical services are provided efficiently.
Effective January 1, 2008, Government Code §56430 requires LAFCO to conduct a review of
municipal services provided in the county by region, sub-region or other designated geographic area,
as appropriate, for the service or services to be reviewed, and prepare a written statement of
determination with respect to each of the following topics:
1) Growth and population projections for the affected area;
8 Commission on Local Governance for the 21st Century, 2000, p. 70.
BY BURR CONSULTING 11
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
2) Present and planned capacity of public facilities and adequacy of public services, including
infrastructure needs or deficiencies;
3) Financial ability of agencies to provide services;
4) Status of, and opportunities for shared facilities;
5) Accountability for community service needs, including governmental structure and
operational efficiencies; and
6) Any other matter related to effective or efficient service delivery, as required by commission
policy.
SPHERES OF INFLUENCE
An SOI is a LAFCO-approved plan that designates an agency’s probable future boundary and
service area. Spheres are planning tools used to provide guidance for individual boundary change
proposals and are intended to encourage efficient provision of organized community services,
discourage urban sprawl and premature conversion of agricultural and open space lands, and prevent
overlapping jurisdictions and duplication of services. Every determination made by a commission
must be consistent with the SOIs of local agencies affected by that determination;9 for example,
territory may not be annexed to a city or district unless it is within that agency's sphere. SOIs should
discourage duplication of services by local governmental agencies, guide the Commission’s
consideration of individual proposals for changes of organization, and identify the need for specific
reorganization studies, and provide the basis for recommendations to particular agencies for
government reorganizations.
Contra Costa LAFCO policies are that LAFCO discourages inclusion of land in an agency’s SOI
if a need for services provided by that agency within a 5-10 year period cannot be demonstrated.
SOIs generally will not be amended concurrently with an action on the related change of
organization or reorganization. A change of organization or reorganization will not be approved
solely because an area falls within the SOI of any agency. In other words, the SOI essentially defines
where and what types of government reorganizations (e.g., annexation, detachment, dissolution and
consolidation) may be initiated. If and when a government reorganization is initiated, there are a
number of procedural steps that must be conducted for a reorganization to be approved. Such steps
include more in-depth analysis, LAFCO consideration at a noticed public hearing, and processes by
which affected agencies and/or residents may voice their approval or disapproval.
The Cortese-Knox-Hertzberg Act requires LAFCO to develop and determine the SOI of each
local governmental agency within the county and to review and update the SOI every five years.
LAFCOs are empowered to adopt, update and amend the SOI. They may do so with or without an
application and any interested person may submit an application proposing an SOI amendment.
LAFCO may recommend government reorganizations to particular agencies in the county, using
the SOIs as the basis for those recommendations. Based on review of the guidelines and practices
9 Government Code §56375.5.
12 PREPARED FOR CONTRA COSTA LAFCO
LAFCO AND MUNICIPAL SERVICE REVIEWS
of Contra Costa LAFCO as well as other LAFCOs in the State, various conceptual approaches have
been identified from which to choose in designating an SOI:
1) Coterminous Sphere: The sphere for a city or special district that is the same as its existing
boundaries.
2) Annexable Sphere: A sphere larger than the agency’s boundaries identifies areas the agency
is expected to annex. The annexable area is outside its boundaries and inside the sphere.
3) Detachable Sphere: A sphere that is smaller than the agency’s boundaries identifies areas the
agency is expected to detach. The detachable area is the area within the agency bounds but
not within its sphere.
4) Zero Sphere: A zero sphere indicates the affected agency’s public service functions should
be reassigned to another agency and the agency should be dissolved or combined with one
or more other agencies.
5) Consolidated Sphere: A consolidated sphere includes two or more local agencies and
indicates the agencies should be consolidated into one agency.
6) Limited Service Sphere: A limited service sphere is the territory included within the SOI of a
multi-service provider agency that is also within the boundary of a limited purpose district
which provides the same service (e.g., fire protection), but not all needed services.
7) Sphere Planning Area: LAFCO may choose to designate a sphere planning area to signal
that it anticipates expanding an agency’s SOI in the future to include territory not yet within
its official SOI.
8) Provisional Sphere: LAFCO may designate a provisional sphere that automatically sunsets if
certain conditions occur.
LAFCO is required to establish SOIs for all local agencies and enact policies to promote the
logical and orderly development of areas within the SOIs. Furthermore, LAFCO must update those
SOIs every five years. In updating the SOI, LAFCO is required to conduct a municipal service
review (MSR) and adopt related determinations. In addition, in adopting or amending an SOI,
LAFCO must make the following determinations:
• Present and planned land uses in the area, including agricultural and open-space lands;
• Present and probable need for public facilities and services in the area;
• Present capacity of public facilities and adequacy of public service that the agency
provides or is authorized to provide; and
• Existence of any social or economic communities of interest in the area if the
Commission determines these are relevant to the agency.
BY BURR CONSULTING 13
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
MSR AND SOI UPDATE PROCESS
The MSR process does not require LAFCO to initiate changes of organization based on service
review findings, only that LAFCO identify potential government structure options. However,
LAFCO, other local agencies, and the public may subsequently use the determinations to analyze
prospective changes of organization or reorganization or to establish or amend SOIs. LAFCO may
act with respect to a recommended change of organization or reorganization on its own initiative, at
the request of any agency, or in response to a petition.
MSRs are exempt from California Environmental Quality Act (CEQA) pursuant to §15262
(feasibility or planning studies) or §15306 (information collection) of the CEQA Guidelines.
LAFCO’s actions to adopt MSR determinations are not considered “projects” subject to CEQA.
Once LAFCO has adopted the MSR determinations, it must update the SOIs for 13 reclamation
districts. This report identifies preliminary SOI policy alternatives and recommends SOI options for
each agency. Development of actual SOI updates will involve additional steps, including
development of recommendations by LAFCO staff, opportunity for public input at a LAFCO
public hearing, and consideration and changes made by Commissioners. A CEQA determination
will then be made on a case-by-case basis once the proposed project characteristics are clearly
identified.
The CKH Act stipulates several procedural requirements in updating SOIs. It requires that
special districts file written statements on the class of services provided and that LAFCO clearly
establish the location, nature and extent of services provided by special districts. Accordingly, each
local agency’s class of services provided is documented in this 2009 MSR. The MSR described the
nature, location, and extent of functions or classes of services provided by existing districts, which is
a procedural requirement for LAFCO to complete when updating SOIs.
LAFCO must notify affected agencies 21 days before holding a public hearing to consider the
SOI and may not update the SOI until after that hearing. The LAFCO Executive Officer must issue
a report including recommendations on the SOI amendments and updates under consideration at
least five days before the public hearing.
14 PREPARED FOR CONTRA COSTA LAFCO
STUDY AREA: THE SACRAMENTO-SAN JOAQUIN DELTA
3. S T U DY A R E A : T H E S AC R A M E N T O -
S A N J OAQU I N D E LTA
AREA OVERVIEW
The Sacramento-San Joaquin Delta is an area unlike any other. Consisting of 1,315 square miles
at the confluence of the Sacramento and San Joaquin Rivers, it is the largest estuary on the west
coast of North and South America. The Delta area is home to nearly 500,000 residents, 55 species
of fish and 750 species of plants and wildlife, including more than 20 that are endangered.10 Nearly
1,000 miles of navigable waterways are a recreational draw from throughout the state.11
The Delta Boundary
Table 3-1 Local Agencies by Delta Zone
Primary Zone
The legal boundary of the Delta was established by the 1959 Delta
RD 830 RD 2090
Protection Act (California Water Code §12220), consisting of 738,239 acres.
RD 2024 RD 2117
The 1992 Delta Protection Act refined the legal boundary of the Delta to
RD 2025 RD 2121
include Primary and Secondary Zones. The Primary Zone of the Delta
RD 2026 RD 2122
consists of about two-thirds of the Delta’s area, and was defined as “land and
RD 2059
water area of primary state concern and statewide significance situated within
Secondary Zone
the boundaries of the Delta…but not within either the urban limit line or
RD 799 RD 800
sphere of influence line of any local government's general plan or studies
RD 2137 BIMID
existing as of January 1, 1992.”12 The Secondary Zone of the Delta was
Both Zones
defined as all Delta land and water area not included within the Primary
RD 2065
Zone.13 The Primary Zone of the Delta was intended to “remain relatively
free from urban and suburban encroachment to protect agriculture, wildlife habitat and recreation
uses,” and the Secondary Zone was “intended to include an appropriate buffer zone to prevent
impacts on the lands in the Primary Zone.”14
IMPORTANCE OF THE DELTA
Farming has played a central role in the land use of the Delta since the mid-1800s. Many of the
Delta’s 60 islands were carved by dredges, for the purpose of land reclamation for agricultural use,
10 Delta Vision Strategic Plan, October 2008, p. v.
11 Delta Vision Committee Implementation Report, December 2008, p. 5.
12 California Public Resources Code §29728.
13 Where the boundary between the Primary Zone and Secondary Zone is a river, stream, channel, or waterway, the boundary line was
defined as the middle of that river, stream, channel, or waterway.
14 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 8.
BY BURR CONSULTING 15
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
more than 100 years ago.15 This process transformed the Delta from a vast network of tidally
influenced marshland and sloughs to some of the most fertile agricultural land in the world. Today,
agricultural land covers more than a half-million acres in the Delta, or in excess of two-thirds of the
total Delta area.16 In Contra Costa County, farmland (including prime farmland) is found in all but
one of the reclamation districts.17 Farming has thrived in the Delta due to the close proximity to a
fresh water source.
The Delta islands keep fresh water from the Sacramento and San Joaquin Rivers from mixing
with the salt waters of the San Francisco Bay. Fresh water from the Delta serves as a water source
for 25 million Californians, including 87 percent of all municipal water used in the East Bay Area,
and provides irrigation for a $37 billion agricultural industry, consisting of nearly three million
agricultural acres.18 Over 1,100 miles of levees protect the water quality, thousands of Delta
residents and billions of dollars in infrastructure and agricultural land from flooding.19
Water Code §12311 identifies protecting eight western Delta islands as a priority. Of the eight
islands, five are protected by reclamation districts in Contra Costa County (Bradford, Holland,
Hotchkiss, Jersey, and Webb), and one is protected by a municipal improvement district (Bethel
Island). DWR gives priority to these western Delta islands for funding via the special projects
program, as these islands have been determined to be critical to control of salinity in the Delta,
protecting water quality to all water users in the state.
DELTA RISKS
The threat of levee failure is nothing new in the Delta. Since 1900, levee failures have flooded
Delta islands 166 times, including seven documented “sunny day” failures during summer low-flow
periods.20 There have been a total of 23 inundation occurrences in Delta areas of Contra Costa
County since 1900, including 16 within Contra Costa reclamation districts, four within Bethel Island
Municipal Improvement District and three on Franks Tract.21 Some flooded islands (such as Franks
Tract) were never recovered, while others (such as Jones Tract in San Joaquin County) have been
recovered at significant state expense.22 Levee failure and island inundation pose a significant threat
to the health of the Delta, as the resulting flood waters would allow salt water to migrate from San
15 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 8.
16 Ibid., p. 10.
17 California Department of Conservation Division of Land Resource Protection, Contra Costa County Important Farmland 2006,
Farmland Mapping and Monitoring Program, 2007.
18 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 3.
19 Delta Vision Committee Implementation Report, December 2008, p. 5.
20 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 12.
21 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 7.
22 DWR Completes Jones Tract Pumpout, December 20, 2004.
16 PREPARED FOR CONTRA COSTA LAFCO
STUDY AREA: THE SACRAMENTO-SAN JOAQUIN DELTA
Francisco Bay into the Delta, contaminating the fresh water supply that millions of Californians rely
on for drinking water and agricultural irrigation.
Due to many years of controversy and inactivity, the long-term health and wellbeing of the Delta
is more threatened now than ever. Most Delta levees do not meet the Federal Emergency
Management Agency’s (FEMA) levee standards, and do not provide 100-year flood protection to the
adjacent lands.23 Delta levees face increasing pressure from the combination of land surface
subsidence, sea level rise and increased winter runoff, and seismic activity, which threaten the
sustainability and reliability of the Delta for the future.
SUBSIDENCE
Land elevations vary throughout the Delta, from over 10 feet above sea level to more than 20
feet below sea level, and the Contra Costa County portion of the Delta is no exception.24 Land
subsidence in the Delta occurs primarily through the oxidization of peat soils.
Peat soils accumulated in the Delta over thousands of years as marsh vegetation died and
accumulated in the swampy (oxygen deficient) environment. With reclamation and drainage of the
Delta, peat soils were exposed to the oxygen-rich atmosphere, which favors microbial oxidation.
Microorganisms such as bacteria and fungi have slowly consumed the rich organic peat soils,
releasing the energy as carbon dioxide to the atmosphere, thus reducing the volume of organic
material.25 Studies on subsidence by the U.S. Geological Survey (USGS) and DWR found that the
amount of carbon dioxide released is directly proportional to the amount of subsidence, with as
much as 50 pounds of carbon dioxide released per acre per day from Delta peat soils.26 According
to DWR, roughly one-half of the peat soil that accumulated over 5,000 years in the Delta has
disappeared over the last 150 years.27
Between one-half to one and a half inches of soil loss per year is common in the Delta.28 With
current agricultural practices, as much as nine feet of additional subsidence is projected to occur in
portions of the central Delta by 2100, with another nine feet of soil loss possible by 2200.29 The
amount of subsidence an area will experience depends on the depth of peat soils remaining, with
subsidence slowing as land surfaces begin to reach underlying (non-peat) mineral soils.
Levees in areas experiencing subsidence require continual rehabilitation and overbuilding, in
order to account for future subsidence. In addition, land subsidence increases the amount of water
23 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 12.
24 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 6.
25 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 38.
26 http://www.water.ca.gov/floodmgmt/dsmo/bdlb/opp/subsidence.cfm
27 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 38.
28 Ibid., p. 38.
29 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 12.
BY BURR CONSULTING 17
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
pressure exerted on the levees, making levees more susceptible to failure. Levee failure in a subsided
area is exacerbated by the fact that the lower land surface elevation accommodates a greater inflow
of salt water to the Delta, which degrades water quality and damages the ecosystem.30
SEA LEVEL RISE AND INCREASED WINTER RUNOFF
Just as Delta levees constructed 100 years ago were not built to accommodate for subsidence,
neither were they built to withstand the forces of rising sea level.31 In its natural state, Delta
wetlands could naturally expand and contract to adjust to sea level changes. Since reclamation,
Delta waterways are limited to fixed channels and sloughs that lack the ability to accommodate sea
level changes. Increased water flows in the Delta have nowhere to go but up, increasing pressure for
seepage through and under the levees, which can lead to levee failure.32
Patterns of sea level change have been observed in both the long- and short-term. The geologic
record shows that sea levels have been as much as 400 feet lower and 10 feet higher than today’s
levels over the last 130,000 years, with an average rate of sea level increase of 0.02 inches per year
over the last 6,000 years.33 Since 1920, the sea level has risen by over seven inches at San Francisco’s
Golden Gate.34
While there is little debate that sea level rise has occurred in the past, the degree to which sea
levels may continue to rise in the future is not as clear, due to uncertainty in the extent and rate of
West Antarctic and Greenland ice sheet melting.35 The Intergovernmental Panel on Climate Change
predicts a sea level rise of between seven inches and nearly 23 inches over the next 100 years, with
an additional six inches possible if the rate of Greenland ice-melt increases;36 however, the CALFED
Independent Science Board suggests that sea level is likely to rise at least 27 to 38 inches by 2100,
with up to 78 inches possible if ice cap melting accelerates.37 The Delta Vision Strategic Plan
recommends “using an expected sea level rise of 55 inches by 2100 in making major policy and
infrastructure decisions.”38
The trend of warmer global temperatures is anticipated to yield higher snow lines, which will
increase storm runoff and peak flood events as more winter precipitation falls as rain rather than
30 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 4.
31 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 40.
32 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 5.
33 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 40.
34 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 10.
35 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 40.
36 Ibid., p. 40.
37 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 10.
38 Delta Vision Committee Implementation Report, December 2008, p. 6.
18 PREPARED FOR CONTRA COSTA LAFCO
STUDY AREA: THE SACRAMENTO-SAN JOAQUIN DELTA
snow.39 In addition, short-term increases in water levels can be caused by ocean and atmospheric
phenomena such as El Niño and high tide events.40 Higher sea levels coupled with larger and more
frequent flood flows to the Delta will further stress levees and increase the likelihood of levee
failure.
SEISMIC ACTIVITY
Earthquakes pose the single greatest threat to the health of the Delta levee system, as six major
fault lines are located in the vicinity of the Delta.41 Although no Delta levee has ever failed as a
result of a major earthquake, the risk posed by a major earthquake is high.42 The USGS estimates
that there is a 62 percent probability that the Bay Area will experience at least one major earthquake
(6.7 or greater) by 2032.43 Such a quake could cause multiple levee failures and widespread flooding,
costing the state between $30 billion to $40 billion, while inundating thousands of agricultural acres,
destroying homes, blocking shipping canals, damaging highways and utility lines, degrading the water
supply, and disrupting water exports from the Delta.44 Despite the significant risks posed by seismic
activity in the Delta, virtually none of the existing Delta levees (and none of the agricultural Delta
levee standards) address seismic risk.45
THE IMPORTANCE OF CAPITAL PLANNING
Delta levees can fail for a number of reasons, including increased water pressure caused by
island subsidence, rising water levels and increased winter runoff, and catastrophic events such as
earthquakes. But levees can also fail due to years of neglect and deferred maintenance, brought
about by erosion, seepage, vegetation growth, and burrowing of animals, among other causes.
Unlike levees along rivers that only hold back floodwaters during high-flow periods, Delta levees are
under constant stress from holding back water year-round, making continued maintenance and
improvement all the more important. Comprehensive, long-term capital improvement strategies are
necessary to adequately plan for proper levee care, and properly balance the tradeoff between the
level of protection provided by the levee system with the uses of land and water enabled by the levee
system.46
39 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 10.
40 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 40.
41 DWR, Final Delta Risk Management Strategy Phase 1 Report, 2009, p. 2.
42 Delta Vision Committee Implementation Report, December 2008, p. 5.
43 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 12.
44 Delta Vision Strategic Plan, October 2008, p. 20.
45 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 43.
46 Delta Vision Strategic Plan, October 2008, p. 37.
BY BURR CONSULTING 19
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
LEVEE CLASSIFICATIONS AND STANDARDS
PROJECT VS. NON-PROJECT LEVEES
“Project levees” are levees which are part of an authorized federal flood control project of the
Sacramento and San Joaquin River systems and are subject to U.S. Army Corps of Engineers
certification and inspection. Of the 1,100 miles of levees in the Delta, approximately 400 miles
(about 35 percent) are classified as project levees.47 No project levees are maintained by reclamation
districts in Contra Costa County.
“Non-project levees,” by contrast, are not part of an authorized federal flood control project,
and are not subject to inspection or certification by the U.S. Army Corps of Engineers. In general,
non-project levees are built and maintained by local landowners and reclamation districts to protect
primarily agricultural lands, although the State of California has provided some supplemental
financing for levee maintenance and emergency response to non-project levees since 1973. More
than 700 miles (roughly 65 percent) of Delta levees are classified as non-project levees, including all
levees maintained by Contra Costa County reclamation districts.48
DELTA LEVEE STANDARDS
In response to significant flood events in the early 1980s, FEMA, the U.S. Army Corps of
Engineers and DWR set new standards for non-project levees in the Delta. FEMA set a short-term
Hazard Mitigation Plan (HMP) standard as an interim goal, with the long-term goal of upgrading all
levees to the U.S. Army Corps of Engineers’ PL 84-99 standard.
As an incentive to upgrade levees, FEMA made the HMP standard a precondition to receiving
disaster assistance for a levee breach after September 10, 1991. Reclamation districts not in
compliance with this deadline have been denied disaster assistance from FEMA since 1991, and
even today not all Delta levees have achieved HMP. HMP standard was not intended to be a long-
term standard for the Delta, and is generally not considered an adequate standard to avoid flooding.
The PL 84-99 design standard is the minimum standard for project levees; however, non-project
levees can become part of the PL 84-99 program if they meet all design standards and pass an initial
eligibility inspection by the Corps. Levees certified as PL 84-99 are eligible for Corps emergency
assistance, and for levee rehabilitation funds in the event of levee damage or a breach.
DWR Bulletin 192-82 standards were established for work done through the DWR Special
Flood Control Projects Unit in 1982. Bulletin 192-82 agricultural standards are the most stringent
standards used to classify agricultural levees.
Urban levee standards are achieved by FEMA 100-year and 200-year flood protection levees, as
well as the Bulletin 192-82 urban standard.
47 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 13.
48 Ibid.
20 PREPARED FOR CONTRA COSTA LAFCO
STUDY AREA: THE SACRAMENTO-SAN JOAQUIN DELTA
Table 3-2 Urban and Agricultural Delta Levee Standards
Levee Standard
For the most part, Delta levees meet HMP standard, although some are below HMP and some
meet PL 84-99 standard. Very few Delta levees meet a standard higher than PL 84-99. The vast
majority of levees in Contra Costa County, and throughout the Delta in general, do not provide 100-
year flood protection and provide no seismic capability.49 Various reclamation districts in Contra
Costa County have identified increasing their levees to PL 84-99 and above as goals within the next
10 years; however, this will only be possible with continued funding support from DWR.
DEMOGRAPHICS AND GROWTH
There are approximately 8,776 residents within reclamation districts in Contra Costa County,
accounting for nearly one-third of the entire Delta islands population. Populations within the
districts are generally small; 11 of the 13 districts have a population of less than 50 individuals,
including eight with a population of less than 20.
The majority of residents within Contra Costa islands or tracts are located within RD 800 (87
percent), primarily in the unincorporated community of Discovery Bay, and an additional 11 percent
live within RD 799, primarily along Dutch Slough. Residential populations are high in these districts
due to the location of homes along waterways, and the inherent recreational appeal of living on the
Delta. Bradford Island also has a significant residential population, but growth within the District
has been limited due to its limited accessibility (a ferry must be taken to reach the island), and its
large agricultural base. The remaining roughly two percent of the population within Contra Costa
reclamation districts consists primarily of farmers, agricultural farm workers and district caretakers
that reside within the district primarily for commercial purposes, not for a recreational lifestyle or
seclusion.
49 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 43.
BY BURR CONSULTING 21
sdnalteW
larutlucirgA
detalupoP
erutcurtsarfnI
Land Use
Levee
Exterior Interior Toe Seismic
Freeboard Crest Slope Slope Drain Capability
None (cid:57) Varies ≤12 ft. 2H:1V 2H:1V No None
Hazard Mitigation (cid:57) (cid:57) (cid:57) 1 ft. above 100-year flood 16 ft. 1.5H:1V 2H:1V No None
Plan (HMP)
PL 84-99 (cid:57) (cid:57) 1.5 ft. above 100-year flood 16 ft. 2H:1V 2H:1V to Yes None
5H:1V
Bulletin 192-82 (cid:57) (cid:57) 1.5 ft. above 300-year flood 16 ft. 2H:1V 3H:1V to Yes Very Little
(Agricultural) 7H:1V
FEMA 100-year (cid:57) (cid:57) 3 ft. above 100-year flood 16 ft. 2H:1V 3H:1V to Yes Very Little
5H:1V
FEMA 200-year (cid:57) (cid:57) 3 ft. above 200-year flood 16 ft. 2H:1V 3H:1V to Yes Very Little
5H:1V
Bulletin 192-82 (cid:57) (cid:57) 3 ft. above 300-year flood 16 ft. 2H:1V 3H:1V to Yes Very Little
(Urban) 7H:1V
Sources: Delta Vision Strategic Plan, 2008 and Department of Water Resources Flood Management Guidelines.
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 3-3 Population, Acreage and Primary Land Use by District
Primary Land Use
District Name
GROWTH AND DEVELOPMENT
The 2000 population of the entire Delta-Suisun Bay region was about 470,000, according to
DWR. Of this amount, approximately 26,000 were residents on Delta islands or tracts, with this
amount expected to nearly triple by 2030.50 The larger Delta-Suisun area faces even more pressure
from population growth, with increases of between 600,000 to 900,000 by 2050, according to the
Department of Finance and DWR.51 More people on Delta islands, and in the Delta-Suisun area in
general, will increase the demand for recreation, transportation, utilities, and water supply, as well as
create more urban runoff to the Delta.52
Significant planned and proposed developments within Contra Costa reclamation districts are
limited to Byron Tract and Hotchkiss Tract. Planned and proposed developments within RD 800
(Byron Tract) include the 292-unit Pantages Bays project and the 4,000 to 6,000-unit Cecchini Ranch
project. Recently completed developments within RD 799 (Hotchkiss Tract) include the 62-unit
Mariner Estates and the 12-unit Spinnaker Cove development. Currently under construction within
RD 799 is the 1,700-unit Summer Lakes North and South development. Build out and absorption
of these projects could potentially increase the population within Contra Costa reclamation districts
50 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 46.
51 Ibid., p. 47.
52 Ibid., p. 46.
22 PREPARED FOR CONTRA COSTA LAFCO
laitnediseR
larutlucirgA
sdnalteW
Population
Acres Population1 per sq. mi.
RD 799 Hotchkiss Tract (cid:57) (cid:57) 3,100 969 200.0
RD 800 Byron Tract (cid:57) (cid:57) 6,933 7,656 706.8
RD 830 Jersey Island (cid:57) 3,750 32 0.5
RD 2024 Orwood/Palm Tract (cid:57) 6,574 402 2.9
RD 2025 Holland Tract (cid:57) 4,090 27 4.2
RD 2026 Webb Tract (cid:57) 5,500 02 0.2
RD 2059 Bradford Island (cid:57) 2,200 48 14.0
RD 2065 Veale Tract (cid:57) 1,298 142 6.9
RD 2090 Quimby Island (cid:57) 769 82 68.2
RD 2117 Coney Island (cid:57) 935 42 2.7
RD 2121 Bixler Tract (cid:57) 584 52 5.5
RD 2122 Winter Island (cid:57) 453 0 0.0
RD 2137 (cid:57) 785 22 1.6
Notes:
(1) Population according to the 2000 Census, except where noted.
(2) Population reported by District.
STUDY AREA: THE SACRAMENTO-SAN JOAQUIN DELTA
by over 21,600 individuals.53 RD 799 anticipates growth to continue in the future, as the entire
District is within the City of Oakley’s East Cypress Corridor Specific Plan area. The City of Oakley
General Plan designates the East Cypress Corridor Specific Plan area for development of up to
5,763 residential dwelling units (including 544 existing residences), in addition to commercial,
agricultural, recreation, and public facilities.54
AGRICULTURAL LAND
The most productive agricultural lands in Contra Costa are located in the northeastern portion
of the County, east of the cities of Oakley and Brentwood, and along the Delta waterways. There
are approximately 30,000 acres of prime farmland located in the County, all of it located in this
general area. Other productive categories of agricultural land include farmland of statewide
importance (nearly 8,100 acres) and unique farmland (nearly 3,600) acres, also primarily located in
the northeast of the County. Farmland of local importance is concentrated in the eastern half of the
County, consisting of approximately 52,000 acres, and land suitable for grazing is located throughout
the County, including nearly 169,000 acres.
Figure 3-1 Farmland Acreage Estimates by District and Type
Farmland is found in all
RD 799
but one of the reclamation
RD 800
districts in Contra Costa
RD 830
County, as shown in Figure 3- RD 2024
1.55 Five reclamation districts RD 2025
have over 3,000 acres of RD 2026
farmland, including three with RD 2059
more than 5,000 acres of RD 2065
farmland. RD 2026 has the RD 2090
greatest amount of prime RD 2117
farmland, at over 4,000 acres. RD 2121
More than half of all prime RD 2122
farmland in Contra Costa RD 2137
County is located within
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000
reclamation districts, including
over one-third located within Prime Statewide Importance Acres
Unique Local Importance
RD 800, RD 2024 and RD
Grazing Land
2026 alone.
53 Based on 2.68 persons per household in unincorporated Contra Costa County, according to Department of Finance estimates for
2008, and a total of 8,066 residential units.
54 City of Oakley, East Cypress Corridor Specific Plan, p. 1.3, 2006.
55 California Department of Conservation Division of Land Resource Protection, Contra Costa County Important Farmland 2006,
Farmland Mapping and Monitoring Program, 2007.
BY BURR CONSULTING 23
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 3-4 Acres of Farmland Under Williamson Act Contracts
Farmland under Williamson Act contracts is Acres of W.A.
located in five of the 13 reclamation districts, as District Name Farmland
shown in Table 3-4. Williamson Act lands are RD 2024 Orwood/Palm Tract 2,800
heavily concentrated in RD 2090 and RD 2117, RD 2026 Webb Tract 134
where the entirety of both islands are enrolled under RD 2059 Bradford Island 481
the Williamson Act. Approximately 45 percent of RD 2090 Quimby Island 789
the farmland within RD 2024 is enrolled under the RD 2117 Coney Island 935
Williamson Act, and nearly 24 percent of all farmland within RD 2059 is under Williamson Act
contract. Within RD 2026, just over two percent of farmland is under Williamson Act contract;
however, this land is in non-renewal, and the contract is set to expire in November 2012.
24 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT SERVICES
4. R E C L A M AT I O N D I S T R I C T S E RV I C E S
This chapter provides an overview of the flood control and drainage services in Contra Costa
County, including how these services are provided by the special districts and other providers not
under LAFCO jurisdiction. The chapter addresses questions relating to growth and population
projections, current and future service needs, infrastructure needs, service adequacy, and financing.
Government structure options are identified for local agencies under LAFCO jurisdiction.
SERVICE PROVIDERS OVERVIEW
This section provides an overview of the 13 reclamation districts under Contra Costa LAFCO
jurisdiction. Levee maintenance services are also provided by the Bethel Island Municipal
Improvement District (BIMID) and the Contra Costa County Flood Control and Water
Conservation District.
For the most part, reclamation districts in Contra Costa County are small operations, with most
services provided by contract with another service provider. Some districts are staffed by full-time
or part-time employees that provide services directly, while other districts are operated entirely by
the volunteer board members.
Table 4-1: Local Agencies Reviewed
District Name
RD 799 Hotchkiss Tract ● ● ● ● ● ● ● ● ●
RD 800 Byron Tract ● ● ● ● ● ● ● ● ●
RD 830 Jersey Island ○ ○ ○ ○ ○ ○ ○ ○ ○
RD 2024 Orwood/Palm Tract ∆ ∆ ∆ ∆ ∆ ∆ ∆ ∆ ∆
RD 2025 Holland Tract ○ ○ ○ ○ ○ ○ ○ ○ ○
RD 2026 Webb Tract ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
RD 2059 Bradford Island ● ● ● ● ● ● ● ● ● ○
RD 2065 Veale Tract ● ● ● ● ● ● ∆ ● ●
RD 2090 Quimby Island ○ ∆ ○ ○ ○ ○ ○ ∆ ∆
RD 2117 Coney Island ○ ○ ○ ○ ○ ○ ○ ∆ ∆
RD 2121 Bixler Tract ○ ∆ ○ ○ ○ ○ ○ ∆ ∆
RD 2122 Winter Island ● ● ● ● ● ● ○ ● ●
RD 2137 ○ ○ ○ ○ ○ ○ ○ ● ∆
Key:
● indicates service provided directly by agency
○ indicates service provided by contract with another service provider
∆ indicates service provided directly by agency and by contract with another provider
BY BURR CONSULTING 25
ecnanetniaM
eeveL
lortnoC
doolF
eganiarD
lanretnI
.tniaM
daoR
eeveL
tnemetabA
deeW
noitcetorP
epolS
lortnoC
tnedoR
lortaP
eeveL
gnithgiF
doolF
ecivreS
yrreF
Map 4-1
Contra Costa County Reclamation Districts - Boundaries and Coterminous SOI
Solano Mokelumne River
Solano Solano County
County CSoaucnratymento River
Sacramento River
Suisun Sacramento Potato
Bay County Slough
2026
2059
Middle Slough212S2acramento
Pittsburg County
Marina Contra Costa
E 3rd St County
New York Slough
Harbor St
E 14th
St
San Joaquin River
W 4th St
Franks
Tract
830
San Joaquin River BBeetthheell IIssllaanndd
ÄÅ
2090
160
Big
Break
Wilbur Ave
E 18th St ÄÅ
160 2137
Hillc
ÄÅ
r
4
est
Ave
Neroly
Rd
mpire
Ave
Ohara
Ave
Ohara
Ave
E Cypress Rd
OO
7
aa
9
kk
9
lleeyy
2025 Old River
E
AAnnttiioocchh
Neroly
Rd
Ohara
Ave
Delta Rd
KKnniigghhttsseenn
San
C o
J
u
o
n
a
t
q
y
uin
Way Lone Tree W 1
St
ay 2065 Middle River
Jeffery
Sunset Rd
Contra Costa 2121
County
BBrree
C
nn
entr
t
a
t
l B
ww
lvd
oo
Dain
oo
ty A
d
v
d
e Oak St Chestnut St
Byron
Hwy 2024
Balfour Rd
Deer
Valley
Rd
Concord
Ave
John
Muir
Pkwy
Concor
Walnut
Blvd
d Ave
Sellers
Ave
DDiissccoovv
D
ee
is
B
c
rr
o
a
y
v
y
y
er y
BBaayy
Marsh Creek Rd
ÄÅ
Marsh Creek 4
Reservoir
evA
llewgnoL
Vasco
Rd
BByyrroonn
800
Camino Diablo
City Boundaries
Urban Limit Line
Byron
Hwy
2117
Reclamation Districts
Clifton Court
Forebay
County Bnd
Los Vaqueros
Reservoir
®
65by1 CPionnet rSa tCreoest,t 3 a47 tC :h5 o 9F Mu :l4 no a 8 tp oy . r4 c CN5 roe 5oma Nr t thme 1 d Wu 2 n5 2ii/ nt1 : yg0 8 ,6 D /2 M:3 e0 a5 v0er. 9 3tlion8 pe4 m Wz,e CnAt, G94IS55 G3r-o0u09p5 a b Trea hasD is se i e t . sm vd e W c a a lt up oah r p r , ci C l m e ep o on r n e o u i t m t n b n as Tt la t it i h y na g Dr i st s ia o le e y t f c p m e io C Cf a d a pt ri o t h pt ty ym o ne r w t i L r e ugsa a in sh m o st et Cu e i wc t ro td s c h ri, s e e t ii h t sn i a a s ifs td d o e d d a arc d e i m s t t i a ar t b ce i a v l yf t da t er h i o o.i t de m h U m n e fC e s r a o r t o e Ch n m o u r eo dsf n n tC l mt o t i hy a r f oe a a b a t n y hi C C s l t ii r ns st Aao y uo s m C f Smt t o a ba to e r a ep sC s g t te aa o e a n lg u o B to C erg n o e r o r t r aeee y a ursd p nC d t p.oh t oy oo i I cr n m f te G s i E ma m n I ibqS df a u o ui yl a nP i r at m y n i b rl t io d y z e a f g o a tar i r rt o ec a io n ipc t mns . reo '. p sa d S t ct u ao c thcuxm ee rre da a ct inye. 0 1 2 4 Miles
RECLAMATION DISTRICT SERVICES
RECLAMATION DISTRICTS
RD 799 – Hotchkiss Tract
Reclamation District No. 799 was formed in 1911 to provide maintenance services to non-
project levees and internal drainage facilities protecting Hotchkiss Tract. RD 799 maintains nearly
12 miles of earthen levees—over four miles along Dutch Slough, two miles along the Contra Costa
Canal, over one mile along Little Dutch Slough, nearly one mile along Rock Slough, and over three
miles of internal ring levee. The District also maintains four pumping stations. The mileage of
drainage ditches maintained was not provided by the District.
RD 800 – Byron Tract
Reclamation District No. 800 was formed in 1909 to provide levee maintenance, flood control
and drainage, siltation dredging, and other specialized services on Byron Tract. RD 800 maintains
nearly 19 miles of earthen levees—nearly 10 miles of agricultural levees along Indian Slough, Old
River and Italian Slough, over six miles of urban levees within the original Discovery Bay
development, and nearly three miles of dry land levee between SR 4 and Italian Slough. The District
also maintains nine miles of drainage ditches and two pumping stations.
RD 830 – Jersey Island
Reclamation District No. 830 was formed in 1911 to provide maintenance services to non-
project levees and internal drainage facilities protecting Jersey Island. RD 830 maintains 16 miles of
earthen levees—over five miles along Dutch Slough, over four miles along the San Joaquin River
and False River, and nearly six miles along Taylor Slough and Piper Slough. The District also
maintains approximately 15 miles of drainage ditches and one pumping station.
RD 2024 – Orwood/Palm Tracts
Reclamation District No. 2024 was formed in 1918 to provide maintenance services to non-
project levees and internal drainage facilities protecting Orwood Tract. In 1995, RD 2036 (Palm
Tract) was dissolved and the area was annexed to RD 2024. RD 2024 maintains approximately 15
miles of earthen levees— 6.5 miles along Old River, 1.0 miles along Rock Slough, 4.5 miles along
Werner Dredger Cut and 2.5 miles along Indian Slough. The District also maintains 13 miles of
drainage ditches, six pumping stations and one flood gate.
RD 2025 – Holland Tract
Reclamation District No. 2025 was formed in 1918 to provide maintenance services to non-
project levees and internal drainage facilities protecting Holland Tract. RD 2025 maintains 11 miles
of earthen levees—over four miles along Sand Mound Slough, nearly four miles along Old River and
Holland Cut, and over two miles along Rock Slough. The District also maintains eight miles of
irrigation canals and three pumping stations.
RD 2026 – Webb Tract
Reclamation District No. 2026 was formed in 1918 to provide maintenance services to non-
project levees and internal drainage facilities protecting Webb Tract. RD 2026 maintains nearly 13
BY BURR CONSULTING 27
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
miles of earthen levees—nearly six miles along the San Joaquin River, over four miles along False
River, nearly two miles along Fisherman’s Cut, and approximately one mile along Old River. The
District also maintains approximately eight miles of irrigation canals and two pumping stations.
RD 2059 – Bradford Island
Reclamation District No. 2059 was formed in 1921 to provide maintenance services to non-
project levees and internal drainage facilities protecting Bradford Island. RD 2059 maintains over
seven miles of earthen levees—nearly four miles along the San Joaquin River, over two miles along
Fisherman’s Cut and over one mile along False River. The District also maintains approximately
seven miles of drainage ditches and one pumping station.
RD 2065 – Veale Tract
Reclamation District No. 2065 was formed in 1923 to provide the reclamation of lands within
the District. RD 2065 maintains 5.1 miles of earthen levees—2.6 miles along Rock Slough, 1.8 miles
along Werner Dredger Cut, and 0.7 miles along Dead Dog Slough. The District also maintains 1.5
miles of drainage ditches and two pump stations.
RD 2090 – Quimby Island
Reclamation District No. 2090 was formed in 1918 to provide maintenance services to non-
project levees and internal drainage facilities protecting Quimby Island. RD 2090 maintains seven
miles of earthen levees—5.5 miles along Old River and 1.5 miles along Sheep Slough. The District
also maintains over five miles of drainage ditches and two pumping stations.
RD 2117 – Coney Island
Reclamation District No. 2117 was formed in 1983 to provide maintenance services to non-
project levees and internal drainage facilities protecting Coney Island. RD 2117 maintains over five
miles of earthen levees— 3.8 miles along Old River and 1.6 miles along the West Canal. The
District also maintains four miles of drainage ditches and one pumping station.
RD 2121 – Bixler Tract
Reclamation District No. 2121 was formed in 1984 to improve and maintain levee, drainage and
irrigation systems on Bixler Tract. RD 2121 maintains two miles of earthen levees—one mile along
the north side of Dead Dog Slough and one mile on the east side of Werner Dredger Cut. The
District also maintains 4.3 miles of drainage ditches and one pumping station.
RD 2122 – Winter Island
Reclamation District No. 2122 was formed in 1984 to maintain, protect and repair existing
levees and other reclamation works on Winter Island. RD 2122 maintains five miles of earthen
levees—over two miles along Middle Slough, nearly two miles along Broad Slough, approximately
one-half mile along New York Slough, and approximately one-half mile along the north of the
Island. The District also maintains two tidal gates, used to obtain water levels necessary to maintain
the island as wetlands.
28 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT SERVICES
RD 2137
Reclamation District No. 2137 was formed in 2003 to provide maintenance services to non-
project levees and internal drainage facilities protecting the westerly portion of the Dutch Slough
Tidal Marsh Restoration area. RD 2137 maintains nearly four miles of earthen levees—over one-
half mile along Dutch Slough, nearly two miles along the east and west banks of Emerson Slough,
and over one mile along Little Dutch Slough. The District also maintains 1.8 miles of drainage
ditches.
OTHER SERVICE PROVIDERS
Bethel Island Municipal Improvement District
BIMID was formed in 1960 to provide various services to Bethel Island, including maintenance
services of non-project levees and internal drainage facilities. BIMID maintains over 11 miles of
earthen levees located along the perimeter of Bethel Island, as well as “various pump stations,
pipelines and canals that are used to collect and dispose of storm water runoff and seepage water on
the island.”56
Contra Costa County Flood Control and Water Conservation District
CCFCWCD provide maintenance services to levees and internal drainage facilities throughout
Contra Costa County. CCFCWCD maintains over one mile of levees in the Marsh Creek area
(Zone 1), approximately seven miles of levees in Walnut Creek (Zone 3B), over one mile of levees in
San Pablo Creek (Zone 6), approximately one mile of levees in Wildcat Creek (Zone 7), and less
than one half of a mile of levees in Pinole Creek (Zone 9).
Discovery Bay Community Services District
DBCSD provides construction and operation of flood protection works and facilities within
Discovery Bay West Villages 2, 3 and 4. A MSR and SOI Update for BDCSD were approved by
LAFCO in May 2006.
Discovery Bay Drainage and Maintenance District
DBD&MD is a dependent benefit assessment district under the auspices of RD 800, as the RD
800 governing body serves as the board for DBRDMD. More detail on the services provided by
DBRDMD is provided in the RD 800 agency profile (Chapter 6) of this MSR document.
Knightsen Town Community Services District
KCSD was formed by LAFCO in 2005 to provide flood control and drainage to the
unincorporated community of Knightsen. A MSR and SOI Update for KCSD were approved by
LAFCO in December 2008. As of the adoption of the MSR for KCSD, the agency had yet to begin
providing flood control and drainage services.
56 Contra Costa LAFCO, East County Sub-Regional MSR, 2008, p. VIII-4.
BY BURR CONSULTING 29
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
REGULATORY CONTEXT
Federal Emergency Management Agency
The Federal Emergency Management Agency (FEMA) defines which geographic areas are
within floodplains and flood hazard areas, and administers the National Flood Insurance Program,
which enables property owners to purchase flood insurance. FEMA identifies flood hazard areas by
producing maps showing flood, flood hazard and floodway boundaries. Several areas of flood
hazards are commonly identified on these maps. FEMA designates floodways where encroachment
is prohibited to ensure that flood waters drain effectively. The special flood hazard area or high-risk
area is defined as any land that would be inundated by a flood having a one percent chance of
occurring in any given year (also referred to as the 100-year flood or base flood). Nearly every
reclamation district in Contra Costa County is subject to 100-year flooding, as determined by
FEMA.
FEMA is also responsible for financing flood disaster recovery efforts. In response to
significant flood events in the early 1980s, FEMA set a short-term Hazard Mitigation Plan (HMP)
standard as a minimum standard for the Delta, with the long-term goal of upgrading all levees to the
U.S. Army Corps of Engineers’ PL 84-99 standards. FEMA made the HMP standard a precondition
to receiving disaster assistance for a levee breach after September 10, 1991.
U.S. Army Corps of Engineers
The U.S. Army Corps of Engineers (Corps) designed and constructed the Sacramento River
Flood Control Project, and establishes standards for maintaining project levees. No reclamation
districts in Contra Costa County maintain project levees; however, reclamation districts with levees
meeting PL 84-99 standards may apply to the Corps for participation in the PL 84-99 program. In
order to be accepted into the program, the district must pass an initial eligibility inspection by the
Corps, and must submit to continuing eligibility inspections every two years thereafter in order to
qualify for emergency assistance and rehabilitation funds from the Corps.
California Department of Water Resources
California Department of Water Resources (DWR) owns 1,600 miles of project levees in
California and directly maintains 152 levee miles, with local reclamation districts maintaining the
remainder of the project levees. DWR is responsible for annual inspections of project levees
maintained by local reclamation districts. If maintenance of project levees is inadequate, DWR may
form a maintenance area, conduct the maintenance directly and charge property owners for
associated costs. There are no such maintenance areas presently in Contra Costa County, because
there are no project levees maintained by reclamation districts in the County. DWR has no
regulatory authority for the Delta non-project levee system.
Local reclamation districts are responsible for their levee system, and must conduct inspections
and maintenance activities on their own schedule. Funding for such maintenance is primarily
generated by landowner assessments; however, since 1973 the State of California has provided
supplemental financing for maintenance and levee improvement projects on local levees through
DWR’s subventions and special projects programs. Delta reclamation districts that are eligible and
choose to participate can submit applications for reimbursement of up to 75 percent of eligible
30 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT SERVICES
costs. DWR performs annual inspection of projects completed with State funding, but does not
conduct overall levee inspections or ratings for non-project levee systems.
California Department of Fish and Game
The California Department of Fish and Game (DFG) regulates diversions, obstructions, or
changes to the natural flow or bed, channel, or bank of any river, stream, or lake in California that
supports wildlife resources. DFG reviews maintenance and rehabilitation plans submitted to DWR
for funding, to ensure that plans are fully mitigated and do not result in a net long-term loss of
riparian, fisheries, or wildlife habitat.
Delta Protection Commission
The Delta Protection Commission (DPC) was created by the 1992 Delta Protection Act. The
goal of the DPC is to ensure orderly, balanced conservation and development of Delta land
resources and improved flood protection. The 23-member DPC is made up of landowners,
members of the Boards of Supervisors from each of the five Delta counties, a representative from
each of the area councils of governments (Sacramento Area Council of Governments, San Joaquin
Council of Governments and the Association of Bay Area Governments), high level leaders from
various State agencies (DFG, Parks and Recreation, Boating and Waterways, Water Resources, Food
and Agriculture, and the State Lands Commission), and Delta residents or landowners in the areas of
production agriculture, outdoor recreation, and wildlife conservation.57
The mission of the DPC is to “adaptively protect, maintain, and where possible, enhance and
restore the overall quality of the Delta environment consistent with the Delta Protection Act and the
Land Use and Resource Management Plan for the Primary Zone.”58 This includes, but is not limited
to, agriculture, wildlife habitat, and recreational activities.
SERVICE DEMAND
FLOOD CONTROL
Most levee systems are subject to hydraulic pressure only during high-water or flood events.
Delta levees, on the other hand, are subject to hydraulic pressure on a constant basis, as they
withhold Delta waters 365 days a year. Delta levees face increasing pressure from a combination of
factors—including land surface subsidence, sea level rise and increased winter runoff, and seismic
activity—that threaten the sustainability and reliability of the Delta for the future. For more
information on factors influencing service demand on Delta levees, see the “Delta Risks” section of
Chapter 3.
57 http://www.delta.ca.gov/commission/default.asp
58 http://www.delta.ca.gov/
BY BURR CONSULTING 31
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
POPULATION GROWTH
Significant population growth within Contra Costa reclamation districts is limited to RD 799
(Hotchkiss Tract) and RD 800 (Byron Tract). Build out of these projects could potentially increase
the population within Contra Costa reclamation districts by as many as 21,600 individuals.
However, growth and development within the larger Delta-Suisun area indirectly impacts Contra
Costa reclamation districts by increasing the demand for recreation, transportation, utilities, and
water supply, as well as creating more urban runoff to the Delta. The year 2000 population of the
entire Delta-Suisun Bay region was about 470,000, with projected population growth of between
600,000 to 900,000 by 2050, according to the Department of Finance and DWR.59 For more
information on population growth in Contra Costa County, see the “Demographics and Growth”
section of Chapter 3.
INFRASTRUCTURE NEEDS OR DEFICIENCIES
In response to significant flood events in the early 1980s, FEMA set a short-term Hazard
Mitigation Plan (HMP) standard as a minimum standard for the Delta, with the long-term goal of
upgrading all levees to the U.S. Army Corps of Engineers’ PL 84-99 standards. FEMA made the
HMP standard a precondition to receiving disaster assistance for a levee breach after September 10,
1991. Reclamation districts not in compliance with this deadline are subject to denial of disaster
assistance from FEMA.
As shown in Table 4-2, seven of the 13 reclamation districts have levees below HMP standards,
nearly all reclamation districts have portions of the land surface below sea level, and all but one
district are within the FEMA 100-year floodplain (RD 800 is between the 100-year and 500-year
flood level). Of the nearly 121 miles of levees maintained by the 13 reclamation districts in the
County, nearly 18 percent (approximately 22 miles) are at less than the minimum (HMP) standard,
and nearly 82 percent (approximately 99 miles) require rehabilitation to meet the long-term goal of
achieving PL 84-99 standard.
Table 4-2 illustrates the significant infrastructure deficiencies within various districts. Contra
Costa reclamation districts face significant flood risk, but many would not even qualify for FEMA
disaster assistance following a levee failure (due to non-compliance with HMP standards). None of
the reclamation districts provide 100-year flood protection, with the exception of portions of levees
maintained by RD 799 and RD 800 at FEMA 100-year flood standards.
The HMP standard was not intended to be a long-term standard for the Delta, and is generally
not considered an adequate standard to avoid flooding. HMP standards provides minimal freeboard
for overtopping due to high river flows, high tides and high winds, and the peat foundation on
which the levees are built is constantly subsiding, causing embankment cracking, loss of freeboard
and continual maintenance.60 In light of this, some districts (such as RD 2025 and RD 2026) had
begun to improve levees beyond HMP standards as of the drafting of this report.
59 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 47.
60 RD 2026, Letter to U.S. Army Corps of Engineers, January 31, 2006.
32 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT SERVICES
Table 4-2: Levee System Infrastructure Overview and Flood Risk
Levee Surface Base Flood Repair After
District Name Miles Levee Standard1 Elevation Elevation Failure?2
RD 799 Hotchkiss Tract 11.7 3.2 mi. at FEMA -5 to 5 ft. 7 ft. Yes
5.2 mi. at HMP
3.3 mi. below HMP
RD 800 Byron Tract 18.9 9.2 mi. at FEMA -4 to 13 ft. < 1 ft. NR
9.7 mi. at PL-99
RD 830 Jersey Island 16.0 6.3 mi. at HMP 0 to -15 ft. 7 ft. No
9.7 mi. below HMP
RD 2024 Orwood/Palm 14.6 14.6 mi. at HMP 0 to -15 ft. 8 ft. (Orwood) Yes
Tracts 7 ft. (Palm)
RD 2025 Holland Tract 11.0 11.0 mi. at HMP 0 to -15 ft. 7 ft. No
RD 2026 Webb Tract 12.9 12.9 mi. at HMP -5 to -20 ft. 7 ft. No
RD 2059 Bradford Island 7.5 4.0 mi. at HMP -5 to -15 ft. 7 ft. No
3.5 mi. below HMP
RD 2065 Veale Tract 5.1 4.2 mi. at HMP -4 to 2 ft. 7 ft. NR
0.9 mi. below HMP
RD 2090 Quimby Island 7.0 7.0 mi. at HMP -5 to -11 ft. 7 ft. No
RD 2117 Coney Island 5.4 5.4 mi. at HMP -5 to -10 ft. 8 ft. No
RD 2121 Bixler Tract 2.0 2.0 mi. below HMP -2 to 14 ft. 7 ft. NR
RD 2122 Winter Island 5.0 3.5 mi. at HMP 0 to 10 ft. 7 ft. NR
1.5 mi. below HMP
RD 2137 3.8 3.0 mi. at HMP -10 to 10 ft. 7 ft. NR
0.8 mi. below HMP
Note:
(1) HMP standard is the minimum standard for levee protection in the Delta. Districts must meet at least HMP standard
to be eligible for FEMA disaster assistance funding.
(2) Public Policy Institute of California, Levee Decisions and Sustainability for the Delta Technical Appendix B, 2008. Repair after
levee failure is according to simulations based on the cost of repair and restoration of the island following a failure against
the land and asset value of the island.
NR = Not reported. The repair after levee failure scenario was not modeled for all districts.
Comprehensive, long-term capital improvement strategies are necessary to adequately plan for
proper levee care, and properly balance the tradeoff between the level of protection provided by the
levee system with the uses of land and water enabled by the levee system.61 As shown in Table 4-2,
from a purely economic standpoint it will likely not be cost effective to repair some islands when
their levees fail.62 Furthermore, funds are too limited for all Delta levees to be equally subsidized by
the State, and rigorous planning at the State level must be done to properly prioritize and allocate
levee maintenance and rehabilitation funds to match areas where it is needed most.
Water Code §12311 identifies protecting Bethel Island, Bradford Island, Holland Tract,
Hotchkiss Tract, Jersey Island and Webb Tract as a priority. Of these six islands, five are protected
by reclamation districts, and one is protected by a municipal improvement district (Bethel Island
61 Delta Vision Strategic Plan, October 2008, p. 37.
62 Public Policy Institute of California, Levee Decisions and Sustainability for the Delta Technical Appendix B, 2008, p. 31.
BY BURR CONSULTING 33
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Municipal Improvement District). DWR gives priority to these western Delta islands for funding
via the special projects program, as these islands have been determined to be critical to control of
salinity in the Delta, protecting water quality to all water users in the state.
Although levee systems and related facilities are distinct entities on each island that cannot be
shared, proper levee maintenance provides indirect benefits outside of district bounds. Because
inundation of one or more islands would increase the effects of wind and wave erosion on
neighboring levees, it is in the interest of all districts to ensure that the integrity of the levees be
maintained and that infrastructure needs continue to be addressed.
SERVICE ADEQUACY
LEVEE STANDARDS
Table 4-3: Minimum FEMA Requirements for Levee Standards
Based on levee standards, most reclamation
districts in Contra Costa County are providing only a
minimum service level (HMP standard) to at least
portions of the levee system, but more than half of all
agencies are not in full compliance with FEMA
requirements that the entire levee system be at or
above HMP.
District Name
Reclamation districts in full compliance with
FEMA’s minimum HMP requirement include RD
800, RD 2024, RD 2025, RD 2026, RD 2090, and RD
2117. Reclamation districts in partial compliance with
FEMA’s minimum HMP requirement (providing
minimum services levels to only portions of the
district) include RD 799, RD 830, RD 2059, RD 2065,
RD 2122, and RD 2137. The only agency in total
non-compliance with the FEMA requirement is RD
2121, with the entire two-mile levee system below
HMP standards.
Water Code §12311 identifies eight western Delta
islands as critical to control of salinity in the Delta, protecting water quality to all water users in the
state. Of these eight islands, five are protected by reclamation districts in Contra Costa County
(Bradford, Holland, Hotchkiss, Jersey, and Webb). The MSR found that three of the five critical
islands are only in partial compliance with minimum FEMA levee requirements. Funding for levee
rehabilitation to meet minimum FEMA requirements can be applied for via the DWR special
projects program. DWR gives priority to these islands for funding due to their importance in the
Delta.
The only two agencies exceeding the minimum FEMA requirement as of the drafting of this
report were RD 800 and RD 799, with portions of the levee system certified as FEMA 100-year
34 PREPARED FOR CONTRA COSTA LAFCO
ecnailpmoC
lluF
ecnailpmoC
laitraP
ecnailpmoC-noN
RD 799 Hotchkiss Tract (cid:57)
RD 800 Byron Tract (cid:57)
RD 830 Jersey Island (cid:57)
RD 2024 Orwood/Palm Tracts (cid:57)
RD 2025 Holland Tract (cid:57)
RD 2026 Webb Tract (cid:57)
RD 2059 Bradford Island (cid:57)
RD 2065 Veale Tract (cid:57)
RD 2090 Quimby Island (cid:57)
RD 2117 Coney Island (cid:57)
RD 2121 Bixler Tract (cid:57)
RD 2122 Winter Island (cid:57)
RD 2137 (cid:57)
RECLAMATION DISTRICT SERVICES
flood levees. RD 2025 and RD 2026 reported being in the process of upgrading the levee system to
PL 84-99 standards as of the drafting of this report.
LEVEE MAINTENANCE
Because DWR has no regulatory authority for the Delta non-project levee system, local
reclamation districts must perform inspections and maintenance activities at their own discretion.63
A summary of levee inspection practices by District is presented in Table 4-4.
Table 4-4: Levee Inspection Practices
Written
Inspection
District Name Levee Inspection Practices Reports?
RD 799 Hotchkiss Tract Levee patrols are performed on a daily basis by District staff. Yes
RD 800 Byron Tract Twice per day (once in each direction) by District staff. Yes
RD 830 Jersey Island The District does not conduct formal levee inspections, but levees No1
are inspected informally by ISD employees on a daily basis. Levee
inspections are performed daily during severe weather events.
RD 2024 Orwood/Palm Trustees monitor the levees on an informal (but regular) basis, and No
Tracts provide more frequent inspections during severe weather events.
RD 2025 Holland Tract Levee inspections are performed on a daily basis by on-site No
farmers. Levee inspections are performed multiple times per day
during severe weather events.
RD 2026 Webb Tract Levee inspections are performed on a daily basis by on-site No
farmers. Levee inspections are performed multiple times per day
during severe weather events.
RD 2059 Bradford Island Informal levee inspections are performed by the Levee Yes
Superintendent at least once per week.
RD 2065 Veale Tract Informal levee inspections performed by Trustees. No
RD 2090 Quimby Island Informal levee inspections are performed twice per day by on-site No
farmers.
RD 2117 Coney Island Informal levee inspections are performed multiples times per week No
by Trustees.
RD 2121 Bixler Tract Informal levee inspections are performed by District Trustees and No
on-site farmers.
RD 2122 Winter Island Levees are inspected once per month during the dry season and No
more often during duck season (from October to January).
RD 2137 The District contracts with engineering firms for levee inspections. No
Note:
(1) RD 830 does not create written inspection reports, but does keep a log of completed inspection activities.
Every reclamation district in Contra Costa County performs levee inspections. Levee
inspections range in frequency from multiples times per day to once per month, and range in
formality from documented reviews with written reports created to eyeballing levees for needed
improvements. Levee inspection practices vary by the type and intensity of land use within the
63 DWR performs annual inspection of projects completed with State funding, but does not conduct overall levee inspections or
ratings for non-project levee systems.
BY BURR CONSULTING 35
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
District, with more frequent inspections performed by districts with full-time staff or those with
maintenance agreements with on-site farmers, and less frequent inspections by districts relying on
services performed by volunteer Trustees.
Only three of the 13 reclamation districts in Contra Costa County create written inspection
reports based on the deficiencies and maintenance needs identified by the levee inspections.
MANAGEMENT
Table 4-5: District Staffing by Type
Staffing levels
Staffing levels vary by reclamation
district, with larger districts tending to have
more paid staff positions, and smaller
districts tending to rely on contract or
volunteer services, as shown in Table 4-5. District
RD 800 has the highest staffing level of
any reclamation district in the county, with
the District directly staffing its full-time
administrative and maintenance-related
positions. RD 800 is the only district in the
County that employs an administrative-
related position on a full-time basis.
RD 799 directly employs a full-time
maintenance worker and a part-time
administrative position. Other districts with
part-time administrative positions include
RD 2059 (by contract) and RD 2090.
RD 800 and RD 799 are the only districts
in the County to directly employ
maintenance-related positions. All other
districts in the County rely on maintenance services by contract with the landowner or on-site
farmer, or rely on volunteer services performed by the District Trustees.
RD 800 is the only reclamation district in the County that compensates Trustees for services on
the board.
Management Practices
While public sector management standards do vary depending on the size and scope of the
organization, there are minimum standards. Well-managed organizations evaluate employees
annually, prepare a budget before the beginning of the fiscal year, conduct periodic financial audits
to safeguard the public trust, maintain relatively current financial records, adjust assessments for
inflation, and plan and budget for capital needs.
36 PREPARED FOR CONTRA COSTA LAFCO
nimdA
TF
nimdA
TP
ecnanetniaM
TF
ecnanetniaM
TP
draoB
detasnepmoC
draoB
reetnuloV
Name
RD 799 Hotchkiss Tract D D D (cid:57)
RD 800 Byron Tract D D (cid:57)
RD 830 Jersey Island C (cid:57)
RD 2024 Orwood/Palm C (cid:57)
Tracts
RD 2025 Holland Tract C (cid:57)
RD 2026 Webb Tract C (cid:57)
RD 2059 Bradford Island C C (cid:57)
RD 2065 Veale Tract V (cid:57)
RD 2090 Quimby Island C D (cid:57)
RD 2117 Coney Island C (cid:57)
RD 2121 Bixler Tract C (cid:57)
RD 2122 Winter Island V (cid:57)
RD 2137 Cypress Corridor C (cid:57)
Notes:
FT = Full-time D = Direct V = Volunteer (Trustees)
PT = Part-time C = By Contract
RECLAMATION DISTRICT SERVICES
An evaluation of the adequacy of management practices is shown in Table 4-6. The first four
indicators are self-explanatory.
Table 4-6: Management Practices
Inflation-indexed assessments means updating assessments with reasonable frequency to
account for changes in the inflation rate. Capital planning involves the preparation of a multi-year
capital improvement plan or comparable planning effort for flood control and drainage capital
replacement and, if relevant, expansion.
All reclamation districts that directly employ staff conduct employee evaluations on at least an
annual basis. RD 830 does not directly employ staff, but closely monitors and evaluates the work of
part-time maintenance workers in conjunction with Ironhouse Sanitary District.
Every reclamation district in the County prepares periodic financial audits and maintains current
financial records, with the exception of RD 2121. Most reclamation districts prepare an annual
budget, although smaller districts tend not to, as there is no statutory requirement for them to do so.
With the exception of RD 799, RD 830 and RD 2059, reclamation districts tend to not have a
standard assessment that increases with inflation, or is evaluated on an annual basis. Some districts
report having a per-acre assessment amount in place that has not changed for many years, and some
smaller districts (especially single-landowner entities) report that no per-acre assessment is charged at
all. Instead, the landowner makes a yearly contribution corresponding to the level of service
anticipated for that year.
Nearly every district reported that it was in the process of updating its capital improvement plan,
in order to have it in place by FY 09-10 to meet new Department of Water Resources (DWR)
requirements. Beginning in FY 09-10, DWR will require districts have a five-year levee
rehabilitation plan in place in order to be eligible for special projects funding from the State. As of
the drafting of this report, the only agency not on target to meet this requirement is RD 2121.
LOCAL ACCOUNTABILITY AND GOVERNANCE
Accountability of a governing body is signified by a combination of several indicators. The
indicators chosen here are limited to: 1) constituent interest in the agency’s activities as indicated by
the rate of contested elections, 2) agency efforts to engage and educate constituents through
BY BURR CONSULTING 37
997
DR
008
DR
038
DR
4202
DR
5202
DR
6202
DR
9502
DR
5602
DR
0902
DR
7112
DR
1212
DR
2212
DR
7312
DR
Evaluate employees annually A A A × × × A × × × × × ×
Prepare timely budget A A A A A A A N N N N N A
Periodic financial audits A A A A A A A A A A N A A
Current financial records A A A A A A A A A A N A A
Inflation-indexed assessment A N A N N N A N N N N N N
Capital planning P A P P P P P P P P N P P
Notes:
A = Practiced adequately N = Not practiced × = Not relevant
I = Practiced but improvement needed P = In progress
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
outreach activities in addition to legally required activities such as agenda posting and public
meetings, and 3) transparency of the agency as indicated by cooperation with the MSR process and
information disclosure. These measures are shown in Table 4-7.
Table 4-7: Accountability Measures
Only RD 799 reported having a recently-contested election, while all other districts reported
having vacancies on the governing body filled by Board of Supervisors appointment. RD 2024 and
RD 2117 reported ongoing vacancies on the governing body due to a lack of constituent interest.
RD 2025 and RD 2026 share two of the same board members due to the same landowner owning a
majority of the land in each district, and one of the shared board members also serves as General
Manager for both districts.
All reclamation districts perform adequate constituent outreach activities, including preparing
and posting meeting agendas, and making minutes available as required. Additional outreach efforts
include websites, emails and newsletters, and articles in community newspapers. Needless to say,
districts with fewer landowners perform significantly less outreach activities than larger districts with
significant residential populations.
Most of the agencies reviewed demonstrated accountability in disclosure of information and
cooperation with LAFCO. Districts that demonstrated only partial accountability included:
• RD 2090: Did not complete the initial Request for Information questionnaire and had
difficulty in providing financial information to LAFCO;
• RD 2121: Did not provide information on infrastructure needs or District financial
records;
• RD 2122: Did not provide an audited financial statement for FY 06-07; and
• RD 2137: Did not complete the initial Request for Information questionnaire and limited
its disclosure of information and cooperation with LAFCO.
38 PREPARED FOR CONTRA COSTA LAFCO
997
DR
008
DR
038
DR
4202
DR
5202
DR
6202
DR
9502
DR
5602
DR
0902
DR
7112
DR
1212
DR
2212
DR
7312
DR
Contested election since 1994 ● × × × × × × × × × × × ×
Constituent outreach activities ● ● ● ● ● ● ● ● ● ● ● ● ●
MSR disclosure ● ● ● ● ● ● ● ● ○ ● ○ ○ ○
Notes:
● = Occurred or adequately practiced × = Did not occur or not practiced
○ = Partially practiced/Needs improvement
RECLAMATION DISTRICT SERVICES
SHARED FACILITIES
The reclamation districts share responsibility for maintaining levees along some of the same
water bodies; however, the districts do not share levee systems or other facilities, and did not
identify any significant reclamation-related facility-sharing opportunities.
A handful of reclamation districts gain efficiencies by cooperating with the primary landowner
or on-site farmer for the purposes of levee maintenance. RD 830 gains efficiencies by collaborating
and sharing equipment with Ironhouse Sanitary District, RD 2090 shares equipment with Ellis
Island Farms, RD 2117 shares equipment with Coney Island Farms, and RD 2122 shares equipment
with Winter Island Farms.
In terms of administration, RD 2025 and RD 2026 shares administrative facilities along with RD
756 and RD 2028 in San Joaquin County. RD 799 has also collaborated with BIMID on certain
administrative matters.
Many districts reported that efficiencies are gained by having engineers and legal counsel that
represent various reclamation districts throughout the Delta. A total of five engineers and six law
firms represent the 13 reclamation districts in the County.
FINANCING
The financial ability of agencies to provide services is affected by available financing sources and
financing constraints. This section discusses the major financing constraints faced by reclamation
service providers and identifies the revenue sources currently available to the service providers.
Finally, it assesses the financial ability of agencies to provide services.
FINANCING SERVICES
Most reclamation districts participate in the Delta Levee Subventions program (“subventions
program”) or the Delta Levee Special Flood Control Projects program (“special projects program”),
which are State programs that provide financial assistance to local levee maintaining agencies for the
maintenance and rehabilitation of non-project levees.
Levee Maintenance
Routine levee maintenance expenditures are primarily financed by landowner assessments, and
subventions reimbursements from DWR. The subventions program began in 1973, and provides
supplemental financing for levee maintenance and improvement projects on local levees. In
addition to the significant application, planning, engineering, State Department of Fish and Game
(DF&G) review, environmental compliance, bookkeeping and records, and competitive bidding
requirements, the subventions program operates on a “reimbursement” basis.
The subventions program is a fiscal year program, running from July 1 through June 30. To
receive subventions reimbursement from DWR, an application and maintenance plan for the
upcoming fiscal year must be filed with the State in May, and a final claim must be submitted in
BY BURR CONSULTING 39
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
October.64 DWR processes and audits the claims in the fall and payments are typically sent out in
March. Delays are caused either by issues related to the District not obtaining DF&G sign-off
typically associated with needs for mitigating impacts associated with levee work, or more recent
delays because of the State Budget crisis.
The maintenance plan filed with DWR must list each major activity and cost, the total
maintenance cost for the year and must include a map, aerial photo or engineered drawing showing
the locations where maintenance will occur. Local agencies are eligible for reimbursement of work
completed under the maintenance plan once the agency has spent an average of $1,000 per levee
mile on qualifying expenses. Qualifying expenses include reasonable costs for engineering, labor,
materials, equipment rental, and other capital costs, and the local agency may be reimbursed up to 75
percent of the costs incurred in excess of $1,000 per levee mile.65 (In other words, the total costs
minus $1,000 per levee mile, times 75% equals the reimbursement amount.) Routine maintenance is
limited to a maximum of $20,000 per levee mile, while levee rehabilitation is limited to $100,000 per
levee mile for work to comply with HMP standards. All work in excess of $25,000 must be
competitively bid and the contract awarded to the lowest responsive, responsible bidder.
Many reclamation districts must “save up” their revenues (assessments, charges, subventions
reimbursements, subsidies, grants, fees, and property tax, if any) until sufficient funds are available
to accomplish a project in a given fiscal year. Once a district is in the subventions program, it is
important to continue to accomplish projects in order to maintain the reimbursement stream.
However, excessive planning, engineering and environmental compliance costs may prevent a
district from participating on an annual basis.
In recent years, local agencies requested an average of $50 million in subventions
reimbursements, but the State only had around $6 million to award.66 Propositions 1E and 84,
passed in November of 2006, provided DWR with nearly $5 billion in new flood management bond
funds.67 Of this amount, it is anticipated that roughly $450-500 million will be available for levee
improvement in the Delta.68 Since the bond money became available, the State has made between
$15 and $20 million per year available for subventions-eligible projects in the Delta.69
64 Levee maintenance and rehabilitation plans submitted to DWR must also be approved by the California Department of Fish and
Game, to ensure that plans are fully mitigated and do not result in a net long-term loss of riparian, fisheries, or wildlife habitat.
65 Ineligible costs for DWR subventions reimbursement include new construction or maintenance of drainage pumps and drainage
ditches, pumping costs, or any ditch cleaning for agricultural or tail water.
66 DWR, Status and Trends of Delta-Suisun Services, May 2007, p. 35.
67 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p 25.
68 Interview with Mike Mirmazaheri, Department of Water Resources, April 27, 2009.
69 Proposition 1E is a 10-year bond, and all funds must be used by FY 15-16. Proposition 84 is a five-year bond, although funding
may be spent after the expiration of the bond in FY 10-11.
40 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT SERVICES
OPERATING COSTS
Figure 4-1: Maintenance Costs per Levee Mile (in thousands), FY 07-08
In FY 07-08, the reclamation
RD 799
districts’ maintenance costs varied
RD 800
from a low of $2,244 per levee mile
RD 830
in RD 2059 to a high of $129,400 per
RD 2024
levee mile in RD 2090, as shown in
RD 2025
Figure 4-1. Maintenance costs are
RD 2026
those expenditures related to
RD 2059
maintaining the levee system to its
RD 2065
existing standard, as opposed to
RD 2090
expenses related to improving the
RD 2117
levee system, which would be
RD 2121
considered rehabilitation. The RD 2122
median cost of levee maintenance RD 2137
per mile was $9,900 in FY 07-08.
$0 $50 $100 $150
Although official standards for
levee maintenance costs are not available, certain “rules of thumb” developed by levee engineers
indicate urban district costs per levee miles of approximately $18,000 and $9,000 for rural districts.70
The maximum allowable expenditures for annual routine maintenance reimbursement under the
DWR subventions program is $20,000 per levee mile.
Levee Improvements
Whereas the emphasis of the subventions program is to fund projects that preserve or maintain
the existing status of a levee, the primary purpose of the DWR special projects program is to fund
levee projects that increase the level of protection. Due to the significant expense associated with
levee improvements, reclamation districts in Contra Costa County could not afford to rehabilitate
levees without support from DWR. Funding for significant levee improvement projects comes
primarily from DWR’s special projects program.
The Delta Levee Special Flood Control Projects program was originally established in 1988, to
address flooding on the eight western Delta islands of Bethel, Bradford, Holland, Hotchkiss, Jersey,
Sherman, Twitchell, and Webb, and the towns of Thornton, New Hope, and Walnut Grove. In
1996, the program was expanded to the entire Delta and to portions of the Suisun Marsh. In total,
the project has funded over $200 million in flood control and habitat projects in the Delta, with
future funding significantly increased by the Proposition 1E and 84 bonds. For FY 08-09, DWR
will have $31 million available to fund special projects in the Delta via a competitive application
process. Projects eligible for special projects funds include levee evaluation, repair, or improvement;
70 MBK Engineers, Bookman-Edmonston, MHM Engineers, and Kleinfelder, Draft Final Yuba County Multi-Jurisdictional Multi-Hazard
Mitigation Plan: Comprehensive Flood Study, 2006, p. 66. “Rules of thumb” for maintenance costs per levee mile were based on analysis by
MBK Engineers of RD 1000 budget and maintenance activities. The estimate for urban costs was supported by Peter Rabbon,
General Manager of California’s Reclamation Board, in Robert Reid’s article, Is California Next?, Civil Engineering, Vol. 75, No. 11,
November 2005, pp. 39-47,84-85.
BY BURR CONSULTING 41
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
setback levees; agency research and planning; engineering analysis or design studies; habitat projects;
and emergency response planning and preparedness.71
Figure 4-2: Rehabilitation Cost per Levee Mile (in thousands), FY 07-08
Three reclamation districts conducted
significant levee rehabilitation activities in FY
RD 2025
07-08, all funded by the DWR special projects
program. The cost of levee rehabilitation per
levee mile for each of the three reclamation
RD 830
districts is shown in Figure 4-2. Whereas the
median level of levee maintenance expenditures
per levee mile in FY 07-08 was under $10,000,
RD 800
all three districts spent in excess of $200,000 per
levee mile in rehabilitation costs in FY 07-08,
illustrating the significant expense involved in $0 $100 $200 $300 $400
such capital improvement projects. For
example, RD 830 anticipates that rehabilitation of its 10 miles of levees below HMP standard will
cost at least $1.0 million per levee mile. Such a large investment will only be possible through DWR
special projects funds.
FINANCIAL ABILITY
Figure 4-3: Average Local Revenue per Levee Mile, FY 04-05 to FY 07-08
The financial ability of local
agencies to provide services without RD 799
assistance from DWR is severely RD 800
limited. In general, the 13 reclamation RD 830
districts do not have a broad enough RD 2024
local revenue base (assessments and RD 2025
property taxes) to fund significant RD 2026
RD 2059
improvements to the levee system.72
RD 2065
As shown in Figure 4-3, more than RD 2090
half of the 13 reclamation districts RD 2117
received an average of greater than RD 2121 NR
$20,000 per levee mile in local revenue RD 2122 $0
RD 2137
from FY 04-05 to FY 07-08; however,
four districts received an average of less
$0 $20,000 $40,000 $60,000 $80,000
than $10,000 per levee mile, including
two which received no local revenue at
71 Ineligible projects include those directly related to work on agricultural, water supply and waste disposal facilities, including projects
that support agricultural operations, such as repair of pumping stations or maintenance of drainage ditches.
72 RD 800 is the only reclamation district in Contra Costa County that collects revenue in the form of property taxes.
42 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT SERVICES
all (the inactive RD 2121 and RD 2122).73 At these levels, even the most well-off districts (RD 800
and RD 2090) could only pay for basic levee maintenance services, and could not afford to
undertake significant levee improvements or rehabilitation activities.
Figure 4-4: Average State Assistance per Levee Mile, FY 04-05 to FY 07-08
Figure 4-4 shows the average
RD 799
amount of state assistance to each of
RD 800
the districts from FY 04-05 to FY
RD 830
07-08. Of the seven districts that
received the highest average levels of RD 2024
state assistance, five correspond to RD 2025
critical islands identified in Water RD 2026
Code §12311, which is consistent RD 2059
with DWR’s policy of giving these RD 2065
islands priority funding for levee RD 2090
maintenance and rehabilitation RD 2117
activities.74 RD 2137 was the only RD 2121 NR
active reclamation district that RD 2122
received no state assistance over this RD 2137 $0
time period, and RD 2121 was
inactive. $0 $50,000 $100,000 $150,000
Delta Levee Coalition
One measure to improve the financial ability of reclamation districts in Contra Costa County is
the formation of the Delta Levee Coalition (DLC). The DLC is a partnership between Contra Costa
County, the Contra Costa Council, East Bay Municipal Utility District, and Reclamation Districts
799, 830, 2024, 2025, 2026, 2059, and 2065, to help obtain funding for levee repairs from the State
1E levee bond.
MSR DETERMINATIONS
This section sets forth recommended findings with respect to the service-related evaluation
categories based upon this review of municipal services for Contra Costa County.
LAFCO is required to identify governance options; however, LAFCO is not required to initiate
changes and, in many cases, is not empowered to initiate these options. LAFCO is required by the
State to act on SOI updates. The Commission may choose to recommend governmental
reorganizations to particular agencies in the county, using the spheres of influence as the basis for
those recommendations (Government Code §56425 (g)).
73 From FY 04-05 to FY 07-08, RD 2122 revenues consisted entirely of State assistance.
74 Islands prioritized by DWR in Contra Costa County are Bradford (RD 2059), Holland (RD 2026), Hotchkiss (RD 799), Jersey (RD
830), and Webb (RD 2026).
BY BURR CONSULTING 43
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
INFRASTRUCTURE NEEDS
1) Portions of the levees maintained by RD 799 and RD 800 afford 100-year flood protection.
All other levees maintained by Contra Costa County reclamation districts do not provide
100-year flood protection.
2) Seven of the 13 reclamation districts have levees below HMP standards. Of the nearly 121
miles of levees maintained by the 13 reclamation districts in the County, nearly 18 percent
(approximately 22 miles) are at less than the minimum (HMP) standard, and nearly 82
percent (approximately 99 miles) require rehabilitation to meet the long-term goal of
achieving PL 84-99 standard.
3) Comprehensive, long-term capital improvement strategies are necessary to adequately plan
for proper levee care, and properly balance the tradeoff between the level of protection
provided by the levee system with the uses of land and water enabled by the levee system.
ADEQUACY OF PUBLIC SERVICES
4) Based on levee standards, most reclamation districts in Contra Costa County are providing
only a minimum service level (HMP standard) to at least portions of the levee system.
5) More than half of all agencies are not in full compliance with FEMA requirements that the
entire levee system be at or above HMP.
6) Every reclamation district in Contra Costa County performs levee inspections; however, only
three of the 13 reclamation districts create written inspection reports based on the
deficiencies and maintenance needs identified by the levee inspections.
7) The majority of reclamation districts in the County do not directly employ staff, and instead
rely on part-time contract labor for maintenance activities.
8) All reclamation districts that directly employ staff conduct employee evaluations on at least
an annual basis.
9) Every reclamation district in the County prepares periodic financial audits and maintains
current financial records, with the exception of RD 2121.
10) All reclamation districts are on target to implement the DWR-required five-year plan by FY
09-10, with the exception of RD 2121.
GROWTH AND POPULATION PROJECTIONS
11) Significant population growth within Contra Costa reclamation districts is limited to RD 799
(Hotchkiss Tract) and RD 800 (Byron Tract). Build out of these projects could potentially
increase the population within Contra Costa reclamation districts by as many as 21,600
individuals.
44 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT SERVICES
12) RD 799 anticipates future growth in conjunction within the City of Oakley’s East Cypress
Corridor Specific Plan area. The City of Oakley General Plan designates the East Cypress
Corridor Specific Plan area for development of up to 5,763 residential dwelling units
(including 544 existing residences), in addition to commercial, agricultural, recreation, and
public facilities.
13) Growth and development within the larger Delta-Suisun area indirectly impacts Contra
Costa reclamation districts by increasing the demand for recreation, transportation, utilities,
and water supply, as well as creating more urban runoff to the Delta. The 2000 population
of the entire Delta-Suisun Bay region was about 470,000, with population growth of between
600,000 to 900,000 by 2050, according to projects by the Department of Finance and DWR.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
14) The reclamation districts’ maintenance costs varied from a low of $2,244 per levee mile in
RD 2059 to a high of $129,400 per mile in RD 2090 in FY 07-08. The median cost of levee
maintenance per mile was $9,900 in FY 07-08.
15) Routine levee maintenance expenditures are primarily financed by landowner assessments
and subventions reimbursements from DWR.
16) The amount of subventions money made available by DWR has increased dramatically
following passage of propositions 1E and 84 in November of 2006, with $20 million
approved for FY 08-09.
17) Due to the significant expense associated with levee improvements, reclamation districts in
Contra Costa County could not afford to rehabilitate levees without support from DWR.
For FY 08-09, DWR will have $31 million available to fund special projects in the Delta via a
competitive application process.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
18) The reclamation districts share responsibility for maintaining levees along some of the same
water bodies; however, the districts do not share levee systems or other facilities, and did not
identify any significant reclamation-related facility-sharing opportunities.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS
19) Accountability is best ensured when contested elections are held for governing body seats,
constituent outreach is conducted to promote accountability and ensure that constituents are
informed and not disenfranchised, and public agency operations and management are
transparent to the public.
20) All reclamation districts demonstrated accountability based on the measure of constituent
outreach efforts.
21) Reclamation districts have little governing body and constituent interest as demonstrated by
a lack of contested elections.
BY BURR CONSULTING 45
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
22) Agencies that did not provide information in a timely manner or demonstrate full
accountability to LAFCO due to insufficient disclosure of information and participation
include RD 2090, RD 2121, RD 2122 and RD 2137.
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
Consolidation of all or several reclamation districts within Contra Costa County into one
reclamation district is a governance alternative. A major obstacle to reclamation district
consolidation relates to the liability associated with levee maintenance responsibilities. Larger
districts, such as RD 799 and RD 800, are professionally staffed, but may be hesitant to accept such
liabilities from smaller, less financially stable districts and are, therefore, unlikely to accept
responsibility by becoming successor agencies. A second obstacle is simply the physical separation
of districts from each other and the inability or difficulty of sharing facilities, equipment and
personnel.
Another obstacle to consolidation is the rural, agricultural preference for lower assessments and
service levels and the urban need for professionally staffed entities and higher service levels. Based
on the unique characteristics within each district (population, land use, land and asset value, flood
risk, etc.), districts do not necessarily share the same goals in terms of flood protection levels or
other policies such as encroachments on or near levees, making widespread consolidation of districts
difficult. Shifts in control from local landowners following consolidation with a larger agency was
identified as a possible obstacle to consolidation.
An additional barrier to consolidation identified in the MSR process relates to the practical and
administrative difficulty of establishing and maintaining an assessment roll for a single district
responsible for separate drainage and flood control areas, given that landowner assessments must be
proportional to the services that are provided. If the District spends legal, engineering or other
expenses on a particular section of levee, landowners protected by a differing levee system do not
receive a direct benefit, greatly complicating the day to day accounting and earmarking of district
expenses.
Alternatively, the reclamation districts could pursue functional consolidation by creating a
regional administrative and maintenance program to pool resources to hire staff to maintain the
levees. This approach would offer professional staff with appropriate equipment that could be
shared in levee maintenance within the County. The downside to this is it would result in increased
costs in reclamation districts that presently rely on board members and volunteers for maintenance
work. A successful approach would likely need to develop assessment financing that would allow
agricultural uses to pay based on need and benefit.
46 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
5. R E C L A M AT I O N D I S T R I C T 7 9 9
( H O T C H K I S S T R AC T )
Reclamation District 799 (Hotchkiss Tract) provides maintenance services to non-project levees
and internal drainage facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 799 was formed in 1911 as an independent special district. The
District was formed to provide levee and drainage maintenance services.75
The principal act that governs the District is the Reclamation District Act.76 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,77 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,78 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,79 and 4) retain an agricultural
expert to advise landowners.80 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.81
The District’s boundary is located entirely within Contra Costa County. RD 799 is located in the
eastern portion of the City of Oakley, at the intersection of East Cypress Road and Bethel Island
Road, as shown in Map 5-1. The boundaries encompass approximately 3,100 acres, or
approximately 4.8 square miles. Contra Costa is the principal county and Contra Costa LAFCO has
jurisdiction. The District is within the Secondary Zone of the Sacramento-San Joaquin Delta, and is
within the countywide urban limit line (ULL).
75 The year of formation was reported by the District. LAFCO records do not date back to District formation, and RD 799 does not
file with the State Board of Equalization.
76 California Water Code, Division 15, §50000-53903.
77 California Water Code §50932.
78 California Water Code §50910.
79 California Water Code §50933.
80 California Water Code §50952.
81 Government Code §56824.10.
BY BURR CONSULTING 47
Map 5-1 RD Boundary and Coterminous SOI
799
BBeetthheell IIssllaanndd
Jersey Island
Dutch Slough
Ú[ Ú[
d
R
i
L
d d
t n R
Cypress Corridor o l S e l t s l a n d
g u u D e y I s l a
h
h
c
t
J e
r
s
h
el
I
OOaakklleeyy
B
e
t
Hotchkiss Tract Ú[
Holland Tract
d
n
E Cypress Rd E Cypress Rd u h
g
o
u
m
C o
o dl
n nS
t r a
a S
C
o
s
t
Ú[
a
C
a
n
a
l
e
v
A
s
Rock Slough
er
ell
S KKnniigghhttsseenn
Reclamation District
Delta Rd
Veale Tract
Levees
Ú[
Pumping Stations
y
w
H City Boundaries
n
o
yr County Boundary
B
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.25 0.5 1 Miles
County of Contra Costa disclaimer of liability for geographic information.
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries.82 The SOI was amended on one occasion, to be consistent with a 2002
reorganization.83
Boundary History
The LAFCO record for RD 799 consists of a single action. In 2002, a reorganization occurred
that annexed 148 acres to the District (identified as the “Burroughs Properties”), and detached 81
acres from the District (identified as “Our Country Club and Contra Costa Canal” and “Duarte and
Contra Costa Canal Properties”).84 The purpose of the reorganization was to correct inaccuracies in
the District’s service boundaries, by annexing areas receiving flood control protection and detaching
areas “located outside the District’s levees and not receiving flood control protection.”85
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a five-member board. For contested elections, board members are
selected by landowners (via all-mail ballot) to staggered four-year terms, with each voter entitled to
cast one vote per dollar of assessment paid to the District. The most recent contested election for a
board seat occurred in 2005. Two vacancies on the District board were filled by appointment by the
governing body in Spring 2009. The newly appointed board seats will be permanently filled by an
all-mail ballot election in November 2009, when three other board seats are up for reelection.
Uncontested vacancies on the governing body are filled by appointment by the Board of
Supervisors. RD 799 board members serve on a volunteer basis and do not receive compensation.
The District’s constituent outreach activities consist of posting notices in public places
throughout Bethel Island and Oakley, mailing and emailing notices to landowners, handing out
information at emergency fairs, and producing a newsletter twice per year.
With regard to customer service, complaints may be filed at the District office, by phone, fax,
mail or email. An ongoing customer service issue for the District pertains to 20.6 acres of land
underwater, abutting landside lots, where there is an issue concerning property ownership.86 The
District reported that it was in the process of resolving the complaint as of the drafting of this
report.
82 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa County.
83 LAFCO Resolution No. 02-23.
84 Ibid.
85 LAFCO Executive Officer’s Report and Recommendation dated October 2, 2002, attached to Resolution No. 02-23.
86 In 2000, the County quitclaimed these parcels to a District Trustee, who then arranged to sell the parcels to the adjacent
landowners. Some landowners filed a complaint, stating that the transfer of the land to the District Trustee was improper. As of
March 2009, the Trustee had resigned his position on the board and had made arrangements to quitclaim the parcels directly to the
District. The District board passed a motion to allow the District attorney and engineers to work on easements for the landowners
directly in front of the underwater lots.
BY BURR CONSULTING 49
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 5-1: RD 799 Governing Body
Reclamation District 799 (Hotchkiss Tract)
Governing Body
Name Position Began Serving Term Expires
Ken Carver Trustee 2005 2009
Jane Lorie, D.V.M. Trustee 2005 2009
Members
David Dal Porto Trustee 2009 2011
Diane Shipway Chair 2009 2011
Dale Wong Trustee 2005 2009
Manner of Selection Landowner elections
Length of Term Four years
Date: Last Thursday of Location: 6325 Bethel Island Road, Bethel
Meetings
each month at 2:00 p.m. Island, CA 94511
Agenda Distribution Posted at District office, post office and other public areas
Minutes Distribution By request, and available at District office
Contact
Contact District Administrator
Mailing Address PO Box 520, Bethel Island, CA 94511
Email/Website NA
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
interview and document requests.
SERVICE DEMAND AND GROWTH
The District bounds encompass agricultural land for cattle grazing, residential and recreational
land uses. The central portion of the District contains lower-density rural residential lands, with
more compact residential development located along the periphery of the District closer to the
Delta. Local business activities include small-scale commercial and various marinas and related
facilities.
Farmland within the District consists primarily of farmland of local importance (approximately
980 acres), but also includes prime farmland (approximately 650 acres), farmland of statewide
importance (approximately 220 acres), unique farmland (approximately 270 acres), and grazing land
(approximately 50 acres). Prime farmland is located in the central and southwestern portion of the
District, adjacent to the Contra Costa Canal. There is no Williamson Act contracted land within the
District.
Access to the District is via East Cypress Road, which bisects the District from east to west.
Jersey Island Road and Bethel Island Road run north-south, perpendicular from East Cypress Road.
Dutch Slough Road and Sand Mound Boulevard run along the exteriors of the District facing the
Delta.
The District considers its customer base to be 1,268 landowners within the District. There were
969 residents in the District, according to 2000 Census data. The District’s population density was
200 per square mile, compared with a countywide density of 1,318. The area has experienced
significant recent growth, and anticipates growth to continue in the future as the entire District is
50 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
within the City of Oakley’s East Cypress Corridor Specific Plan area. Significant development
projects include the recently completed Spinnaker Cove (12 units) and Mariner Estates (62 units)
projects, and the 1,700-unit Summer Lakes North and South development that is currently under
construction. The City of Oakley General Plan designates the East Cypress Corridor Specific Plan
area for development of up to 5,763 residential dwelling units (including 544 existing residences), in
addition to commercial, agricultural, recreation, and public facilities.87
Growth concerns identified by the District pertain to the increased need for flood protection
and levee maintenance services. Service demand will be increased with the construction of Summer
Lakes, as a new internal levee ring constructed around a portion of the development will require
maintenance. RD 799 does not receive development impact fees; however, the District establishes
reimbursement agreements with developers outlining development requirements, levee flood
standards, and other rules and regulations. For new development, the District requires that new
levees must be constructed to FEMA flood protection standards (three feet above the 100-year
flood level).
The District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies. The County and City of Oakley Community Development
Departments forwards subdivision applications within the District to RD 799 for comment. The
District’s engineers review applications, provide comments and give approval, then forward plans to
the RD 799 board for comments, concerns, changes, or approval.
There have not been any recent changes in service provided by the District; however, the
District reported that landowners on Dutch Slough Road requested that the District issue parking
permits, in order to regulate automobiles parking on the waterside of the levee. The District had
formed a Parking Committee to plan for providing the service, and reported that it was working on
developing proper signage and vehicle stickers, as of March 2009. It is unclear whether the District
is authorized to provide such a service under Water Code §50933, as districts “may construct,
maintain, and operate…road systems, and related facilities to provide access to the district's
levee…and to provide access to the lands within the district.” If the District has not already done
so, it would be prudent to consult its attorney to verify that providing permits for parking on the
levee is consistent with its powers under the principal act.
MANAGEMENT
The District regularly employs one part-time secretary/manager (20 hours per week), one full-
time levee superintendent and two part time laborers (32 hours per week). The full-time levee
superintendent position was vacant as of the drafting of this report; however, the District reported
that a District Trustee was serving as acting levee superintendent, and it planned to fill the position
by Spring 2009.
The laborers report to the District manager and levee superintendent, and the manager and levee
superintendent report to the District Board at monthly meetings. The District maintains written job
descriptions for all staff. The District evaluates employee performance every six months, and the
District manager conducts workload monitoring and oversees levee maintenance on a daily basis.
87 City of Oakley, East Cypress Corridor Specific Plan, p. 1.3, 2006.
BY BURR CONSULTING 51
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Laborers document their performance by regularly taking before and after pictures of levee
maintenance work. In the past, the District has interacted with Bethel Island Municipal
Improvement District to compare operations and conduct benchmarking between the agencies.
Levee patrols are performed on a daily basis by District staff. Every six months the levee
superintendent and District engineer perform a written levee inspection report to document needed
maintenance and rehabilitation activities. The most recent written levee inspection report provided
by the District was from December 2008. In addition, RD 799 meets once per year with the
Department of Water Resources (DWR) and the Department of Fish and Game to review projects
completed with State funding in the previous year.
The District reported that it adopts an annual budget, and annually prepares audited financial
statements. The most recent audited financial statement provided to LAFCO by the District was for
FY 06-07.
In addition to written levee inspection reports, the District reported that it was in the process of
implementing a five-year capital improvement plan as of the drafting of this report, which it
anticipated having in place by FY 09-10. Other planning efforts include emergency plans and
protocols, which the District distributes to the public.
FINANCING
The District has demonstrated the financial ability to provide minimally adequate service to
portions of the District. Berms do not meet minimum flood protection standards along the Contra
Costa Canal, and levees meet only minimally adequate standards along the outer portions of the
District (along Dutch Slough, Rock Slough and Sand Mound Slough). The District requires new
development to construct new levees to FEMA 100-year flood protection standards (such as the
ring levee at the Summer Lakes development), but lacks the financial ability to provide 100-year
flood protection throughout the District.
Figure 5-1: RD 799 Expenditures, FY 04-05 through FY 07-08
District expenditures fluctuate year to
$700,000
year as capital needs and development
projects vary by year, and are not regular, $600,000
ongoing expenses. Expenditures were
$500,000
higher in FY 05-06 than in recent years due
to increased maintenance activities $400,000
performed that year. To a lesser extent,
$300,000
levee maintenance needs and efforts also
fluctuate somewhat from year to year. $200,000
Somewhat less maintenance occurred in FY
$100,000
07-08 than in prior years, resulting in
$0
somewhat lower expenditures than usual.
Revenue fluctuations have generally FY 04-05 FY 05-06 FY 06-07 FY 07-08
followed the expenditure trend, with higher
intergovernmental revenues in FY 05-06 than subsequent years due to a greater volume of
reimbursable capital projects that year.
52 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
The District received approximately $550,500 in revenues in FY 07-08. RD 799 relies on
assessments, intergovernmental revenues and developer reimbursements to fund services.
Assessments generated 39 percent of operating revenue in FY 07-08, DWR subventions funds
generated 33 percent, and development reimbursements generated 25 percent. Assessments vary by
parcel location, acreage and land use type.88 Special assessments are levied on parcels within the
Summer Lakes development to fund higher service levels along the ring levee providing 100-year
flood protection. The general and special assessment rate is increased five percent per year.
Intergovernmental revenues consist of DWR subventions reimbursements for levee maintenance.
The District does not charge development impact fees, but instead enters into agreements with
individual developers for specific projects, some of which require the District be reimbursed for
services. Capital projects associated with developments are constructed by the developer, and
turned over to the District for maintenance.
Total expenditures for FY 07-08 were over $367,000, 65 percent of which were for levee
maintenance, 15 percent for administrative costs, and 10 percent for pumping station and canal
maintenance and operations. An additional 10 percent of expenditures were spent on insurance,
professional fees, and other miscellaneous purposes. The District spent approximately $20,400 on
maintenance costs per levee mile, compared to a countywide median level of $9,900 per levee mile.
The District had no long-term debt at the end of FY 07-08. The District does not have a formal
policy on maintaining financial reserves. The District had $308,570 in unrestricted net assets of at
the close of FY 06-07. In other words, RD 799 maintained over seven months of working reserves.
88 In FY 07-08, the District levied an assessment rate of $361.18 per residential parcel on Dutch Slough and Sand Mound Slough
levees, $180.60 per residential parcel in the interior of the District, $451.48 per acre on industrial and commercial properties, and
$18.06 per acre on agricultural properties.
BY BURR CONSULTING 53
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 5-2: RD 799 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
In FY 07-08, reclamation services were financed primarily by assessments (39%), intergovernmental revenues
(33%) and development reimbursements (25%).
Development Fees and Requirements
Agricultural (per acre) NA
Residential (per unit) Single Family: NA Multi-Family: NA
Non-residential (per 1,000 sq. ft.)Commercial: NA Industrial: NA
Development Requirements: For new development, the District requires that new levees must be
constructed to FEMA flood protection standards (three feet above the 100-
year flood level).
RD 799 Audited Financial Statements
Revenues FY 06-07 FY 07-081 Expenditures FY 06-07 FY 07-081
Total $599,816 $550,530 Total $476,420 $367,194
Property Tax $0 $0 Operations $329,160 $276,041
Assessments $276,121 $215,544 Drainage & Utilities2 $22,898 $36,816
Intergovernmental Revenues $213,125 $181,912 Levee Maintenance3 $306,262 $239,225
Levee Maintenance $213,125 $181,912 Capital Improvements4 $4,659 $0
Capital Improvements $0 $0
Administrative5
$56,317 $53,742
Developer Reimbursements $101,701 $140,139 Professional Fees6 $58,345 $18,734
Interest $7,009 $5,426 Insurance $26,021 $17,559
Other Revenues $1,860 $7,509 Miscellaneous $1,918 $1,118
Note:
(1) FY 07-08 financials are unaudited.
(2) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(3) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance expenditures
are those that are necessary to maintain the levee to its existing standard of protection.
(4) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing a
cross-section, engineering studies, etc.).
(5) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(6) Legal and accounting services.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 799 provides levee maintenance and internal drainage services. The District conducts
vegetation removal and weed abatement, ditch cleaning, rodent control, and upkeep of access roads
as part of its routine levee maintenance work. The District is also responsible for flood fighting and
levee patrol during high water events. Major levee rehabilitation projects are performed by contract.
54 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
LOCATION
RD 799 provides services within its boundary area, the entirety of Hotchkiss Tract. The District
does not provide any services outside of Hotchkiss Tract.
The tract has been determined to be critical to the health of the Delta. Hotchkiss Tract is one of
the eight western Delta islands that DWR has identified as critical to control of salinity in the Delta,
protecting water quality to all water users in the state. The District provides statewide benefits
outside its bounds.89
INFRASTRUCTURE
Key infrastructure in the District includes over 11 miles of earthen levees and four pumping
stations. The mileage of internal drainage ditches maintained by the District was not provided. The
District reports that just over three miles of levees meet FEMA flood protection standards (three
feet above the 100-year flood plain), over five miles of levees meet the Hazard Mitigation Plan
(HMP) standard (one foot above the 100-year floodplain), and the remaining three miles of levees
meet less than the HMP standard.90 Levees meeting FEMA flood protection standards were
constructed as part of the Summer Lakes South development, and turned over to the District in
2005.91 Under a November 2002 License Agreement among the U.S. Bureau of Reclamation
(USBR), Contra Costa Water District (CCWD) and Reclamation District 799 (Contract No. 02-LC-
20-7939), RD 799 may use and maintain the east bank of the unlined portion of the Contra Costa
Canal for flood control purposes, secondary to water conveyance purposes. The Canal berms were
built in the 1930's for water conveyance; they were not designed for flood protection and do not
meet flood control standards.
According to DWR, there have been no inundation occurrences on Hotchkiss Tract since
1900.92 Surface elevations range from five feet above sea level in the southwestern portion of the
District to between 5 feet below sea level in the northern and eastern portions of the District.93 The
base flood elevation, which is the anticipated water level in a 100-year flood occurrence, is seven feet
above mean sea level. In other words, the entire island would be covered by 2-12 feet of water in a
100-year flood event. Hence, the entire island is presently classified by FEMA as being within the
100-year floodplain.
89 Water Code §12311.
90 For a detailed explanation of levee standards and specifications, please refer to chapter 4.
91 RD 799 Resolution No. 2005-10, dated August 25, 2005.
92 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 7.
93 Ibid., p. 6.
BY BURR CONSULTING 55
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Figure 5-2: RD 799 Dutch Slough Levee
The District reported that subsidence appears to have occurred along the Dutch Slough levee,
but this has not yet been confirmed by survey. The District did not specify whether it plans to
conduct this research in the near future. Service challenges identified by the District pertain to the
difficulty of conducting levee rehabilitation work on Dutch Slough levees due to the proximity and
encroachments of existing homes.
The December 2008 inspection identified most levee segments as being in good condition, with
normal maintenance repairs needed; however, these levees only meet HMP standard, which is a
minimally acceptable standard that does not provide 100-year flood protection. Needed
maintenance activities include vegetation removal, re-grading and adding riprap to exposed levee
surfaces.
The primary infrastructure need identified in the District’s December 2008 levee inspection is
the rehabilitation of the berms along the Contra Costa Canal, which were identified as being in
“poor to very poor” condition.94 The inspection noted unstable berm conditions, evident by
94 HDR, RD 799 Levee Inspection & Evaluation, December 17, 2008.
56 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
sloughing, cracking and erosion, and noted that “normal maintenance repairs would not be
sufficient to stabilize the levee slope.” Berms along the east bank of the Contra Costa Canal are
within RD 799; however, the District reported that it does not perform regular maintenance or
rehabilitation activities in this area. RD 799 is authorized under the November 2002 License
Agreement to maintain the berms, but is not required to do so. According to DWR, RD 799 is
eligible to receive subventions reimbursements for maintenance activities performed along this
segment of berm.95
CCWD maintains the berms for purposes of water conveyance and routinely repairs significant
damage from storms and other causes. However, improvements to raise the flood protection
standard would be made at the discretion of RD799, consistent with the November 2002 License
Agreement.96 Long-term, these Canal berms will be eliminated as CCWD implements its Canal
Replacement Project which replaces the unlined Canal with a buried pipeline. The timing of the
Canal Replacement project along the berms subject to the License Agreement is uncertain, but is
estimated to take place within the next 10 years. New development is planned next to the Canal in
this area and would be required to provide appropriate flood protection.
Other upcoming improvements pertain to levee work that will be done in conjunction with the
Contra Costa County Department of Public Works replacement of the current Bethel Island Bridge.
During the course of the bridge replacement the District plans to stabilize the levee around the
bridge with sheet pile. This project will be incorporated into the District’s upcoming five-year plan.
95 Interview with Mike Mirmazaheri, Department of Water Resources, April 27, 2009.
96 Interview with Mark Seedall, Senior Planner, Contra Costa Water District, March 19, 2009.
BY BURR CONSULTING 57
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 5-3: RD 799 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Direct Weed Abatement Direct
Flood Control Direct Slope Protection Direct
Drainage Direct Vector/Rodent Control Direct
Upkeep of Levee Access Roads Direct Levee Patrol Direct
Irrigation Water None Flood Fighting Direct
District Overview
Total Levee Miles 11.7 Surface Elevation 5 to -5 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 3.3 Dry Land Levee 0.0
HMP Standard 5.2 Urban Levee 3.2
PL-99/Bulletin 192-82 Standard 0.0 Agricultural Levee 8.5
FEMA Standard 3.2 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) Yes - 4
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A22 Base Flood Elevation 7 ft.
Levee Inspection Practices
Levee patrols are performed on a daily basis by District staff. The levee superintendent and District engineer
perform a written levee inspection report every six months.
Levee Inspection Reports
Most Recent Written Inspection 12/17/2008 Inspection Rating None1
Levee Segment Description Condition2
Dutch Slough North and east District boundaries Good
Rock Slough Southern District boundary Good
Contra Costa Canal Southwest District boundary Poor to very poor
Little Dutch Slough Western District boundary Good
South Summer Lake Levee Internal subdivision ring levee Good
Levee Maintenance
Miles Rehabilitated, FY 07-08 0.0 Miles Needing Rehabilitation 3.3
% Rehabilitated, FY 07-08 0% % Needing Rehabilitation 28%
Rehabilitation Cost per Levee Mile3 NA Maintenance Cost per Levee Mile4 $20,447
Infrastructure Needs/Deficiencies
Significant infrastructure needs were identified in levees along the Contra Costa Canal. The December 2008
levee inspection calls for the entire slope to be re-graded with imported embankment and armored with riprap
to meet flood protection standards.
Note:
(1) The December 2008 levee inspection did not give an overall inspection rating, but did rate individual levee segments as shown below.
(2) HDR, RD 799 Levee Inspection & Evaluation, December 17, 2008.
(3) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number of
miles rehabilitated in FY 07-08.
(4) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
58 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
GOVERNANCE ALTERNATIVES
A governance alternative for RD 799 involves Bethel Island Municipal Improvement District
(BIMID). BIMID provides levee maintenance services to the levees surrounding Bethel Island.
Both Districts have compatible land uses, including residential, recreational and marina facilities
located along the waterfront at the periphery of the Districts, and agricultural land uses in the central
portion of the Districts. RD 799 reported that it has a good working relationship with BIMID, and
in the past has consulted with BIMID on administrative issues. Although certain accountability
deficiencies were noted in the BIMID MSR, BIMID improvements in recent years were also
identified in the MSR. For this reason, it does not appear that BIMID would offer an improvement
over existing governance of RD 799. The BIMID MSR did not identify the governance option of
transferring BIMID levee functions to RD 799; this option should be considered in the next MSR
cycle.
The District generally expressed reluctance towards consolidation, indicating that it does not
want to assume the risk of levee failure from another District. The residential population and
significant residential development within RD 799 make it an unsuited match for consolidation with
surrounding primarily agricultural districts, such as RD 2137, RD 830, RD 2065, and RD 2025.
Boundary reorganization in the western portion of the District was identified as a possible
governance alternative. DWR owns approximately 436 acres in the western portion of RD 799,
between Jersey Island Road and Little Dutch Slough, that it plans to maintain as part of the Dutch
Slough Tidal Marsh Restoration Project. The Dutch Slough Tidal Marsh Restoration Project site
also includes approximately 730 acres within RD 2137, also owned by DWR. Long-term plans for
the site call for the restoration and preservation of the area as open space, habitat and recreational
uses. One alternative allows breaching of the existing levees to establish water features within the
preserve. Under such a scenario, urban flood protection within the City of Oakley’s East Cypress
Corridor Specific Plan would be provided by a new levee running north-south along Jersey Island
Road, maintained by RD 799.97 Detaching the DWR-owned property from RD 799 to officially
cede maintenance responsibility to DWR would be appropriate once a Jersey Island Road setback
levee has been constructed, and turned over to RD 799.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The residential population within the district was 969 residents according to 2000 Census
data. The area has experienced significant recent growth, and anticipates growth to continue
in the future.
2) Significant development projects include the recently completed Spinnaker Cove (12 units)
and Mariner Estates (62 units) projects, and the 1,700-unit Summer Lakes North and South
97 City of Oakley, East Cypress Corridor Specific Plan, 2006, p. 5.83.
BY BURR CONSULTING 59
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
development that is currently under construction. Other possible future development
projects identified by the District include a shopping center and a mixed use
commercial/residential development, and other projects consistent with the East Cypress
Corridor Specific Plan.
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
3) Hotchkiss Tract is one of the eight western Delta islands that DWR has identified as critical
to control of salinity in the Delta, protecting water quality to all water users in the state.
4) Over three miles of levees meet FEMA flood protection standards (three feet above the 100-
year floodplain), and provide 100-year flood protection. Other levees in the District do not
provide 100-year flood protection, including over five miles of levees that meet the HMP
standard and three miles that do not meet the HMP standard.
5) Service demand will be increased with build-out of the Summer Lakes development, as a
new internal levee ring constructed around the development will require maintenance. The
levee ring portion around Summer Lakes South was turned over to the District in 2005.
6) For new development, the District requires that new levees must be constructed to FEMA
flood protection standards of three feet above the 100-year flood level.
7) Rehabilitation of the berms along the Contra Costa Canal to HMP or higher standards is a
significant infrastructure need; however, RD 799 reported that it does not provide regular
maintenance to these berms. Flood protection deficiencies include unstable berm conditions
evident by sloughing, cracking and erosion.
8) The District reported that subsidence appears to have occurred along the Dutch Slough
levee. Confirming the extent of the subsidence by engineer survey was reported as a need.
9) The District provides minimally adequate flood protection, based on levee standards. The
District adequately maintains HMP levees along Dutch Slough and Sand Mound Slough, but
does not provide adequate service to berms along the Contra Costa Canal, which do not
meet HMP standards. The District’s 2008 levee inspection report noted that routine
maintenance activities are needed on HMP levees, and significant rehabilitation is needed to
non-HMP berms along Contra Costa Canal.
10) The District spent approximately $20,400 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
11) The District reported that the most significant service challenge pertains to the difficulty of
conducting levee rehabilitation work on Dutch Slough levees due to the proximity and
encroachments of existing homes.
12) The District is in the process of implementing a five-year capital improvement plan, which it
anticipates to have in place for FY 09-10.
60 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
13) The District reported that landowners on Dutch Slough Road requested that RD 799 issue
parking permits as a new service, in order to regulate automobiles parking on the waterside
of the levee. If the District has not already done so, it would be prudent to consult its
attorney to verify that providing permits for parking on the levee is consistent with its
powers under the principal act.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
14) The District has demonstrated the financial ability to provide minimally adequate service to
portions of the District. Berms do not meet minimum flood protection standards along the
Contra Costa Canal, and levees meet only minimally adequate standards along the outer
portions of the District (along Dutch Slough, Rock Slough and Sand Mound Slough). The
District requires new development to construct new levees to FEMA 100-year flood
protection standards (such as the ring levee at the Summer Lakes development), but lacks
the financial ability to provide 100-year flood protection throughout the District.
15) The District increases its assessment by five percent per year; however, assessments do not
generate sufficient revenue to provide adequate levee maintenance throughout the District.
16) The District does not receive development impact fees; however, the District establishes
reimbursement agreements with developers outlining development requirements, levee flood
standards, and other rules and regulations.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
17) The District collaborates with BIMID to reduce certain administrative costs.
18) Consolidation with BIMID could offer opportunities to share facilities and equipment
needed for levee maintenance. No other opportunities for shared facilities were identified.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
19) Accountability to local voters is achieved by the highly visible nature of the District. Public
interest in serving on the governing body is high, as evidenced by the number of recently
contested elections.
20) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
21) A government structure option is consolidation with BIMID.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
BY BURR CONSULTING 61
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
AGENCY PROPOSAL
The agency reported a desire to retain its existing coterminous SOI.
SOI OPTIONS
Given the considerations addressed in the Municipal Service Review, three options are identified
for the RD 799 SOI:
SOI Option #1 – SOI reduction in western portion of District
Reducing the SOI in the western portion of the District would signify that LAFCO anticipates
that RD 799 may initiate detachment of the 436-acre parcel owned by DWR once a Jersey Island
Road setback levee has been constructed and turned over to the District. Such a configuration
would be consistent with the City of Oakley’s East Cypress Corridor Specific Plan, and would
increase efficiency as the DWR-owned parcel in RD 799 is part of the larger 1,666-acre Dutch
Slough Tidal Marsh Restoration Project.
SOI Option #2 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
SOI Option #3 – SOI expansion to Bethel Island
SOI expansion for RD 799 to include Bethel Island would signify that LAFCO anticipates that
RD 799 should take over levee maintenance services from Bethel Island Municipal Improvement
District.
RECOMMENDATION
SOI reduction in the western portion of the District, between Jersey Island Road and Little
Dutch Slough, is recommended for RD 799. Such a configuration would be consistent with the City
of Oakley’s East Cypress Corridor Specific Plan, and would increase efficiency as the DWR-owned
parcel in RD 799 is part of the larger 1,666-acre Dutch Slough Tidal Marsh Restoration Project.
Table 5-4: RD 799 SOI Analysis
Issue Comments
SOI update SOI reduction in the western portion of the District, between Jersey Island
recommendation Road and Little Dutch Slough.
Services provided RD 799 provides maintenance services to non-project levees and internal
drainage facilities.
62 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 799 (HOTCHKISS TRACT)
Present and planned The District bounds encompass agricultural land for cattle grazing,
land uses in the area residential and recreational land uses. The central portion of the District
contains lower-density rural residential lands, with more compact
residential development located along Dutch Slough and Sand Mound
Slough. Residential land uses in the central portion of the District are
increasing in density due to construction of the Summer Lakes South
development. Other planned developments within the District are
consistent with the City of Oakley’s East Cypress Corridor Specific Plan.
Land use in the DWR-owned portion of the District is primarily
agricultural.
Location of facilities, Levees protected by the District are located along Dutch Slough, Little
infrastructure and Dutch Slough, Rock Slough, the Contra Costa Canal, and around Summer
natural features Lakes South. Pumping stations are located along the periphery of the
District. Natural features that affect service provision are the Delta
waterways, and surface and floodplain elevations.
Projected growth in the Projected growth within the District is largely contingent upon build-out
District/Recommended of the 1,700-unit Summer Lakes development, and absorption rates of
SOI recently-built units in Spinnaker Coves and Mariner Estates.
Present and probable There is a present and probable need for levee maintenance services in the
need for public facilities area, as the levee system has significant maintenance and rehabilitation
and services in the area needs. The growing population within the District exacerbates the need
for increased flood protection.
Opportunity for infill The recommended SOI update would be consistent with the City of
development rather than Oakley’s East Cypress Corridor Specific Plan.
SOI expansion
Service capacity and The District provides minimally adequate flood protection, based on levee
adequacy standards. There are significant improvements needed in the berm
segment along the Contra Costa Canal, where berms do not meet HMP
standard. Levees along Dutch Slough meet HMP standard, but require
routine maintenance. These levees do not provide 100-year flood
protection.
Social or economic Communities of interest include the 1,268 landowners within the District,
communities of interest the developers of Summer Lakes, Mariner Estates and Spinnaker Cover,
and the City of Oakley.
Effects on other Reducing the SOI in the area between Jersey Island Road and Little Dutch
agencies Slough would have no direct impact on any other agencies; however, it
would signal that LAFCO anticipates that RD 799 may initiate detachment
of the 436-acre parcel owned by DWR once a Jersey Island Road setback
levee has been constructed and turned over to the District.
Potential for Potential for consolidating RD 799 with BIMID for levee maintenance
consolidations or other purposes may be a governance option.
reorganizations when
boundaries divide
communities
Willingness to serve The District has demonstrated a willingness to serve by providing levee
maintenance to Hotchkiss Tract since 1911.
BY BURR CONSULTING 63
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Potential effects on Agricultural lands will be decreased with the development of the Dutch
agricultural and open Slough Tidal Marsh Restoration Project; however, these losses will be
space lands offset by increases in the amount of open space and tidal marshland
created by the project.
Potential environmental Although no potential environmental impacts were identified in the MSR,
impacts the LAFCO counsel and planner should make CEQA determinations.
64 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 800 (BYRON TRACT)
6. R E C L A M AT I O N D I S T R I C T 8 0 0
( B Y RO N T R AC T )
Reclamation District 800 (Byron Tract) provides levee maintenance and flood control, drainage
services, siltation dredging, and other specialized services.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 800 was formed in 1909 as an independent special district. The
District was formed to provide levee maintenance and flood protection services to land owned by
the West-Wilhoit Company.98
The principal act that governs the District is the Reclamation District Act.99 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,100 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,101 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,102 and 4) retain an agricultural
expert to advise landowners.103 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.104
The District’s boundary is located entirely within Contra Costa County, and consists of Byron
Tract which is bisected by State Route 4 (SR 4) and is adjacent to the Contra Costa-San Joaquin
County line at Old River, as shown in Map 6-1. The boundaries encompass approximately 6,933
acres, or approximately 10.8 square miles. Contra Costa is the principal county and Contra Costa
LAFCO has jurisdiction. The District is within the Secondary Zone of the Sacramento-San Joaquin
Delta. That portion of the District north of SR 4 is within the countywide urban limit line (ULL),
while the southern portion is outside the ULL.
98 The formation date was reported by the District. LAFCO and BOE records do not date back to District formation.
99 California Water Code, Division 15, §50000-53903.
100 California Water Code §50932.
101 California Water Code §50910.
102 California Water Code §50933.
103 California Water Code §50952.
104 Government Code §56824.10.
BY BURR CONSULTING 65
Map 6-1 RD 800 Boundary and Coterminous SOI
Orwood and Palm Tracts
Indian Slough
Ú[
DDiissccoovveerryy
BBaayy
d
R
e
k
a
L
w
o
Will
r
d D
y
Bl
v
Marina Rd
n
n
el
a a
B h
D r y C
o
rt
v
e r
p o
w Clipper Dr s c
N
e
·|}þ
4
Di
Ú[
Kellogg Creek
Byron Tract
e
e
v r
e e
L v
d
Ri
n d
BByyrroonn a
L
Ol
y
r
D
Frisk
Creek
B
y ro Clifton
n
H Court
w
y Forebay
h
g
u
o
Sl
n Coney Island
a
li
a
It Reclamation District
Brushy Creek Levees
City Boundaries
Ú[
Pumping Stations
County Boundary
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.25 0.5 1 Miles
County of Contra Costa disclaimer of liability for geographic information.
RECLAMATION DISTRICT 800 (BYRON TRACT)
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries. 105
Boundary History
LAFCO and State Board of Equalization (BOE) records indicate that there have been no
approved boundary changes for RD 800 since 1973.106 The District reported it was unaware of
earlier boundary changes.
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a five-member board. Board members are elected to staggered four-
year terms, with votes based on landowner assessment values ($140 per home/$15 per acre for
agricultural land). However, there have not been any contested elections, so vacancies on the
governing body are filled by appointment of the County Board of Supervisors.
The Board of Trustees meets monthly on the first Thursday at 10:00 a.m. in the District office.
Trustees receive a $100 meeting stipend for up to three meetings per month.
Table 6-1: RD 800 Governing Body
Reclamation District 800 Byron Tract
Governing Body
Name Position Began Serving Term Expires
Bob Anderson President 1993 2009
Jeff Dawson Member 2007 2011
Members
David Harris Secretary 1999 2011
Robert Lyman Member 2005 2009
Ray Tetreault Member 20071 2009
Landowner elections based on assessment value. If uncontested, vacancies are
Manner of Selection
filled by appointed of the County Board of Supervisors.
Length of Term Four years
Date: First Thursday of Location: 1540 Discovery Bay Blvd, Suite A
Meetings
each month at 10:00 a.m. Discovery Bay, CA 94505
Agenda Distribution Posted in the office window; mailed by request; planning to post on website.
Minutes Distribution Distributed at Board meetings and by request; planning to post on website.
Contact
Contact General Manager
Mailing Address PO Box 262, Byron, CA 94514
Email/Website jconway@RD800.org/www.RD800.org
Note:
(1) Trustee Tetreault is filling the remainder of a term that was vacated
105 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
106 The BOE record for RD 800 begins in 1973 and shows no boundary changes since then. Contra Costa LAFCO records begin in
1965 and show no approved boundary changes to RD 800.
BY BURR CONSULTING 67
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Since May of 1968, the Board has also governed the Discovery Bay Drainage and Maintenance
District, which is not under LAFCO purview. The Maintenance District is a benefit assessment
district established a number of years ago to provide drainage and maintenance services. The
District is limited to a single tax rate area generally located north of River Lake Road and west of
Willow Lake Road.
The District conducts constituent outreach activities by maintaining a District website
(www.RD800.org), by publishing an occasional newsletter (Spring 2002, Spring 2003, Winter 2004,
Summer 2007), and by encouraging the public to attend Board meetings. Board agendas are posted
at the District office, and Board vacancies are posted at three locations in the Discovery Bay
community. Voter participation is encouraged through newspaper public notices, articles, and
signage. The District reported that it will soon post Board agendas and minutes to the District
website.
With regard to customer service, complaints may be filed in writing to the District Manager, or
by attending a Board meeting. Within FY 07-08 there were no complaints filed.
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
LAFCO map inquiries and document requests.
SERVICE DEMAND AND GROWTH
Access to RD 800 is via SR 4 which traverses the District in an east-west direction. Private levee
roads provide perimeter access for the agriculture levee along Indian Slough, Old River and Italian
Slough. The urban levee through Discovery Bay is within a street section or adjacent to a street.
Farm service roads provide access to the Dry Land Levee along the westerly side of the District.
Interior access in the agricultural portion of the District is limited, primarily from Kellogg Creek
Road via Bixler Road, and Rankin Road/Western Farms Ranch Road via Byron Highway. (Refer to
Map 6-1)
The District bounds encompass a majority of the unincorporated community of Discovery Bay,
surrounding agricultural land, and public facilities. The District provides flood protection to
approximately 3,718 properties, including 3,390 residential parcels and 26 non-taxable parcels.
The predominate land use within the District is agricultural, although there are varied urban uses
in the community of Discovery Bay. Within the District’s 6,933 acres, approximately 1,150 acres are
urban and 5,783 acres are agricultural, primarily alfalfa, corn and row crops. The State Farmland
Mapping and Monitoring Program classifies agricultural land in the District as Prime Farmland
(approximately 3,000 acres), Farmland of Statewide Importance (1,500 acres), Unique Farmland (800
acres), and Grazing Land (400 acres). There are no Williamson Act contracted lands within the
District.
Public facilities outside the Discovery Bay area include the Discovery Bay Community Services
District wastewater treatment facility, and the Contra Costa Water District Old River Water Intake
Pumping Plant. A future site for a high school campus for the Liberty Union High School District
has been designated on the south side of SR 4.
68 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 800 (BYRON TRACT)
The Town of Discovery Bay, an unincorporated community, is a water recreation-oriented
development consisting of: residential units, many of which have access from a series of ‘bays’ to
Indian Slough and the Delta; a marina and yacht club; an 18-hole private golf course; neighborhood
retail commercial and professional services; an elementary school; parks and recreation areas; and
fire station and Sheriff’s Office sub-station. Municipal services (i.e., potable water, wastewater, park
and recreation, limited street lighting, and flood protection within Discovery Bay West Villages 2, 3
and 4) are provided by the Discovery Bay Community Services District (DBCSD), whose
boundaries are different than RD 800. A MSR and SOI Update for DBCSD were approved by
LAFCO in May 2006.
While included as part of the Discovery Bay community, development along Bixler Road
(including the community shopping center anchored by Safeway, and new residential development –
Discovery Bay West, Lakeshore, The Lakes, Ravenswood) are not within the boundaries of RD 800.
The District considers its customer base to be landowners within the District, including
Discovery Bay residents and several agricultural property owners. There were approximately 7,656
residents in the District (all except approximately 24 within Discovery Bay), according to 2000
Census Data, with another 1,325 residents adjacent to the District along Bixler Road. The District’s
population density was 709 persons per square mile, compared with the 2000 countywide density of
1,318. The portion of Discovery Bay within the District boundary is significantly built out, with a
few remaining residential lots and approximately 8-acres of vacant commercial land.
The District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies. The District does review planning and development proposals and
provides comments to the Contra Costa Community Development Division on projects as they
relate to the District. The proposed Pantages Bays project, consisting of 292 single-family dwellings
on 172 acres and located along Kellogg Creek adjacent to the District boundary, is one such project.
The Cecchini Ranch, located between the Discovery Bay community and Old River, and north
of SR 4 is within the District, and within the countywide urban limit line (ULL). New development
projects have been proposed for this 1,121 acre area, including a master planned community by
Private Island Homes that would include: 4,000 to 6,000 new homes, water-oriented, commercial
and light industrial uses; plus parks, schools, trail system, open space, and interpretative center.
MANAGEMENT
The District employs four full-time employees: the District Manager, an Administrative
Assistant and two Maintenance Workers. Legal, engineering and accounting services are provided
by contract. Staff report to the General Manager who reports to the Board at monthly meetings.
The District evaluates employee performance on an annual basis, with the District Manager
evaluating the employees and the District Board evaluating the General Manager. Workload
monitoring is accomplished through monitoring of time cards.
Other than routine maintenance which is conducted by District staff, projects involving levee
maintenance, canal cleaning and pipe replacement are performed by contractors. Projects in excess
of $25,000 are competitively bid.
BY BURR CONSULTING 69
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The District adopts an annual budget, does a five-year budget forecast, and annually has
prepared a financial report by an independent auditor. The most recent audited financial statement
provided to LAFCO by the District was for FY 07-08.
Capital improvement projects for significant levee improvements are budgeted each year, with
projects accomplished as sufficient funding is accrued. As part of the long-term planning of the
District, unreserved funds are designated for specific items as indicated in the Financing section.
FINANCING
The District’s financial ability to provide services appears to be adequate because it receives both
property tax revenue and landowner assessment revenue. The District also participates in the State
levee subvention program, which provides limited incremental revenue. The District has a healthy
reserve and is able to allocate funds for specific tasks.
Figure 6-1: RD 800 Expenditures, FY 04-05 through FY 07-08
District expenditures are fairly
$2,000,000
consistent from year to year, with some
$1,800,000
variance due to the amounts expended
$1,600,000
for specific projects. However, these
$1,400,000
fluctuations are more a function of the
$1,200,000
costs incurred in a particular fiscal year
$1,000,000
than changes in annual revenues.
$800,000
Typically, the District accrues funds
$600,000
until sufficient revenues are available to
$400,000
pay for a particular project, be it levee
$200,000
rehabilitation, silt dredging, equipment
$0
replacement, or levee and lake
FY 04-05 FY 05-06 FY 06-07 FY 07-08
maintenance.
The District utilizes a modified accrual basis of accounting. Revenues are recognized as soon as
they are both measurable and available. Property taxes, property assessments, State levee
subventions, reimbursements, homeowners’ property tax relief and interest are all recognized as
revenues in the current Fiscal Year. All other revenue items are considered to be measurable and
available only when cash is received by the District. Expenditures generally are recorded when a
liability is incurred, as under accrual accounting.
The District two major funds: 1) General Fund – which is established to account for resources
devoted to financing the general services that the District performs; and 2) Special Revenue Fund –
which is established to account for the proceeds of specific revenue sources other than special
assessments or major capital projects. Included in the General Fund are property taxes, property
assessments and other sources of revenue used to finance the fundamental operations of the
District. Special Funds are generally funds that originate from State and Federal programs.
The District received $1,909,155 in revenues in FY 06-07 and $2,023,599 in FY 07-08. RD 800
relies primarily on property taxes and landowner assessments to fund services. While it varies from
year to year, property tax comprises approximately 45 percent of the District’s revenues, while
landowner assessments generate approximately 31 percent. The other revenue sources comprise the
70 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 800 (BYRON TRACT)
remaining 24 percent and include State subventions and grants, and interest income. Details for FY
06-07 and FY 07-08 are provided in Table 6-2.
The current property tax rate for the District varies by Tax Rate Area (TRA) from 4.69 percent
to 5.09 percent of the 1 percent countywide property tax. There is one TRA for the Discovery Bay
Drainage and Maintenance District with a current tax rate of 1.08 percent that generates
approximately $45,000 per year in property tax revenue. The current landowner annual assessment
for the District is $140 per residential parcel and $15 per acre for agricultural land.
Total expenditures for FY 06-07 were $1,475,839 and for FY 07-08, a total of $1,710,799. A
majority of these costs were for capital improvements (37 percent), drainage and utilities (18
percent), levee maintenance (11 percent) and employee salaries and benefits (10 percent). Details are
provided in Table 6-2. In FY 07-08, the District spent approximately $9,900 on maintenance costs
per levee mile, which was the median level of maintenance among all reclamation districts.
The District has unreserved funds, with a portion on deposit with the Contra Costa County
Treasurer, and the majority invested with the California Local Agency Investment Fund (LAIF). At
the beginning of FY 09-10, this account contained over $3.6 million. The unreserved balance
constituted 210 percent of annual expenditures in FY 07-08. The District Board has also designated
the majority of these funds for specific longer term programs/projects. These include:
Equipment Replacement $1,149,915
Dredging Bio-filter 576,822
Retention Pond Project
Archive Files and Mapping 20,000
Kellogg Creek Widening 61,369
Levee Rehabilitation 853,000
Willow Lake Maintenance 54,901
Total $2,716,007
The District has no long-term debt and relies on inter-fund transfers to balance short-term
deficits.
All capital improvements on the levee system are coordinated through the District Manager with
technical assistance from the District Engineer. Capital costs are funded by the subventions
program, with specific projects budgeted and completed when funding is sufficient.
BY BURR CONSULTING 71
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 6-2: RD 800 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
Reclamation services are financed primarily by property tax (45%) and landowner assessments (31%).
Development Fees and Requirements
Agricultural (per acre) None
Residential (per unit) Single Family: None Multi-Family: None
Non-residential (per 1,000 sq. ft.)Commercial: None Industrial: None
Development Requirements: New development must contruct levees to PL 84-99 Standards.
RD 800 Audited Financial Statements
Revenues FY 06-07 FY 07-08 Expenditures FY 06-07 FY 07-08
Total $1,909,155 $2,023,599 Total $1,475,839 $1,710,799
Property Tax 883,801 903,455 Operations 433,582 501,363
Assessments 624,778 625,210 Drainage & Utilities1 234,644 313,283
Intergovernmental Revenues 252,051 361,196 Levee Maintenance2 205,518 188,080
Levee Maintenance 101,886 30,063 Capital Improvements3 619,527 632,875
Capital Improvements 150,165 331,133 Administrative4 283,864 292,611
Development Impact Fees 0 0 Professional Fees5 68,419 103,610
Interest 143,843 133,738 Insurance 58,484 69,290
Other Revenues 4,682 0 Miscellaneous6 5,383 111,050
Note:
(1) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(2) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(3) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(4) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(5) Legal and accounting services.
(6) Miscellaneous expenditures include captial outlay, navigation and education.
72 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 800 (BYRON TRACT)
RECLAMATION SERVICE
NATURE AND EXTENT
RD 800 provides a number of services relating to flood protection for agricultural and urban
areas within Byron Tract, and waterway management in conjunction with the Discovery Bay
development.
Traditional flood protection services include levee rehabilitation and reconstruction, levee
maintenance, levee road repair and maintenance, levee slope surface protection, weed abatement,
vector and rodent control, levee patrol and inspection, and flood fighting. The District also
provides residents with information on flood insurance and emergency preparedness.
Within the Discovery Bay development are 20 ‘bays,’ 10 ‘coves,’ Willow Lake, and assorted
waterways and channels. RD 800 is responsible for insuring that the waterways are navigable, and
that water circulates properly and drains properly. This entails maintaining and operating two pump
stations, and periodic dredging of the channels to eliminate silt build-up. The District also monitors
water quality and maintains navigational aids (buoys and signs).
Routine maintenance and repair, weed abatement and vector/rodent control are carried out by
the District maintenance workers. Activities such as levee improvements, pipe replacement, canal
cleaning, and dredging are performed by contract.
LOCATION
RD 800 provides services within its boundary area, which comprises 6,933 acres. The District is
somewhat unique in that both developed areas and agricultural areas are within the District
boundary, but outside the levee system. (Refer to Map 6-1.) There is also an 80-acre parcel on the
west side of the District that is within the dry land levee, but outside the District boundary; and an
approximate 200-acre parcel near Byron Highway and Clifton Court Road that is outside the levee
but within the District boundary.
Byron Tract is not identified as a critical asset by California Water Code §12311 with respect to
sustaining the fresh water/saltwater balance and health of the Delta. However, with the significant
investment in residential, recreational, commercial, and agriculture within the District, continued
reclamation and protection of lands within the District is considered essential by the Board of
Trustees.
BY BURR CONSULTING 73
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
INFRASTRUCTURE
The District provides direct services to three types of levees:
• Agricultural non-project levees 9.7 miles;
• Urban levees 6.5 miles; and
• Dry land levees 2.7 miles.
Figure 6-2: RD 800 Agricultural Levee
Agricultural non-project levees with rock
rip rap on the water side extend from the
northeast corner of the Discovery Bay
development easterly along the south side of
Indian Slough to Old River, then south along
the west side of Old River to its intersection
with Italian Slough on the south end of the
District. These levees are in the State-funded
Delta Levee Subventions Program. The
District has participated in the subventions
program since 1981. In 1990, the District
undertook a comprehensive levee retrofit
program to reconstruct all 9.7 miles of the agricultural levees to meet the PL 84-99 standard. The
multi-phase project was financed by reimbursements from the subvention program; and the District
completed the $6 million project in 2001. The agricultural levees also meet the guidelines for 100-
year flood protection certification, and the District has received notification from the Federal
Emergency Management Agency (FEMA) that these levees qualify as Provisional Accredited Levees.
The District Engineer reported that the District was in the process of documenting the levees for
accreditation at the time this report was drafted.
Figure 6-3: RD 800 FEMA Urban Levee
An urban levee constructed to FEMA
urban levee standards is located within the
original Discovery Bay development area.
The levee segments are integrated into the
development, either as streets or adjacent to
streets. (Refer to Map 6-1). The urban levee
provides flood protection to the interior of
the development (including the elementary
school, the commercial areas, and those
homes that do not have access to open
water). Residential areas on the water side of
the levee have been elevated above the flood
level, or are built upon the levee itself. Several hundred feet of this levee need additional height to
meet federal guidelines. The District is currently identifying potential improvements and costs.
74 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 800 (BYRON TRACT)
A dry land levee which also meets FEMA urban levee standards runs along the western
boundary of the District between SR 4 and Italian Slough.
Land within the District is within Flood Zone B, which indicates an area between the 100-year
and 500-year flood limits (generally an average flood depth of less than one-foot). Open water
within the Discovery Bay development is within Flood Zone A2 (with a base flood elevation of 8-
feet above sea level). Ground elevations within the District range from: 00 (sea level) along the
western District boundary; 4-feet below sea level in the agricultural portion of the District; to
between 9 to 13 feet above sea level in the central portion of the Discovery Bay community. The
goal of the District is to provide 200-year flood protection.
District levees are inspected twice per day (once in each direction) by District personnel.
Inspection records are maintained in conjunction with employee time sheets, and with mapping to
indicate where repairs are located. DWR inspects once per year as part of the subventions program.
The Corps of Engineers (COE) conducts a formal inspection every four years as part of the Federal
Rehabilitation and Inspection Program under Public Law 84-99. The District’s most recent COE
inspection was in August of 2006 and resulted in no deficiencies being noted and the District
receiving an ‘Acceptable’ rating.
Subsidence is not an issue for Byron Tract, although some organic material (peat soil) exists on
the Cecchini Ranch, with depths up to 10-feet. The urban levee is constructed on solid soil, and the
agricultural levees were reconstructed with non-peat soils.
According to DWR, there have been no levee failures on Byron Tract in the 1967-2004 period.107
Likewise no levee failures or breaches have occurred in the past four years.108
In FY 2006-07, the District undertook routine levee maintenance, levee rehabilitation and
environmental mitigation under the subventions program at a total cost of $1,007,500. Routine
levee maintenance in the amount of $251,500 involved levee inspection, rodent control and filling
burrows, repair and grading of levee patrol roads, repair of minor levee slip outs and erosion, hydro-
seeding, controlling seepage and boils, cleaning drains and toe ditches adjacent to landside levee toe,
repair of waterslide slope protection, levee vegetation control, and flood emergency planning and
preparation.
Levee rehabilitation work in the amount of $750,000 included construction of landside berms
for stability, flattening waterside slopes to 2:1 and/or landside slopes to 3:1, and reconstruction of
all-weather patrol roads.
Environmental mitigation in the amount of $6,000 paid for Fish & Game permits, mitigation
agreements, and levee enhancement and vegetation management.
One concern the District is dealing with is siltation from Kellogg Creek and developed areas
west of the District. This requires additional dredging to keep the boat channels clear. One solution
being proposed by the District is to construct a biofilter retention facility that would capture silts
107 DWR &DFG, Risks and Options to Reduce Risks to Fisheries and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008.
108 Interview with Christopher Neudeck District Engineer on March 23, 2009.
BY BURR CONSULTING 75
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
before they enter the waterways. The District is working with the Regional Water Quality Control
Board to develop a solution that would include District purchase of the land for the facility and
grant funding to construct the facility.
Table 6-3: RD 800 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Direct Weed Abatement Direct
Flood Control Direct Slope Protection Direct
Drainage Direct Vector/Rodent Control Direct
Upkeep of Levee Access Roads Direct Levee Patrol Direct
Irrigation Water None Flood Fighting Direct
District Overview
Total Levee Miles 18.9 Surface Elevation -4 to 13 feet
Levee Miles by Standard Levee Miles by Type
No Standard 0.0 Dry Land Levee 2.7
HMP Standard 0.0 Urban Levee 6.5
PL 84-99 Standard 9.7 Agricultural Levee 9.7
Bulletin 192-82 Standard 0.0 Other 0
FEMA Standard 9.2
District Facilities
Internal Drainage System Yes Pump Station(s) Yes - 2
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation B Base Flood Elevation Less than 1-foot
Levee Inspection Practices
Twice per day (one in each direction) by RD 800 personnel.
Levee Inspection Reports
US Army Corps of Engineers 2006 Inspection Rating: Acceptable
Levee Segment Description Condition
Dry Land Levee West boundary of District south of Highway 4 Fair¹
Urban Levee Within the Discovery Bay community Excellent¹
Agricultural Levee Indian Slough, Old River and Italian Slough Good¹
Levee Maintenance
Miles Rehabilitated, FY 07-08 Selected Areas Miles Needing Rehabilitation 0.9
% Rehabilitated 3% % Needing Rehabilitation 5%
Rehabilitation Cost per Levee Mile² $263,500 Maintenance Cost per Levee Mile³ $9,900
Infrastructure Needs/Deficiencies
District levees will meet the 100-year flood protection standard in 2009, with levee upgrades to meet the
200-year flood protection standard currently being planned.
Notes:
(1) Source: field observations.
(2) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08
divided by the number of miles rehabilitated in FY 07-08.
(3) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided
by the total number of levee miles.
76 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 800 (BYRON TRACT)
GOVERNANCE ALTERNATIVES
Five governance options were identified.
Consolidation with other reclamation districts is an option. However, the District indicated that
it would not be interested in consolidating with adjacent reclamation districts (such as RD 2024 or
RD 2117), owing to the unique services that RD 800 provides, and its commitment to serve the
residents of the Discovery Bay community. The District does not have an interest in consolidating
with other reclamation districts whose levee protection standards are different than for Byron Tract.
Neighboring reclamation districts provide services to agricultural activities only, and are not tasked
with protecting urban development.
Another option includes annexation of an 80-acre agricultural parcel on the west side of the
District that is within the dry land levee, but outside the District boundary and SOI; and detaching a
200-acre agricultural parcel outside the levee system adjacent to Byron Highway and Clifton Court
Road that does not currently receive District services.
Annexation of the proposed Pantages Bays residential project (292 single-family dwellings) is an
option that would likely be a development condition and project requirement.
Transferring responsibility for flood protection from RD 800 to Discovery Bay Community
Services District is an option. With LAFCO approval of DBCSD’s requests in 2002 and 2003 to
provide construction and operation of flood protection works and facilities, there are now similar
services being provided by RD 800 and DBCSD. With future urban development (Bixler Road
corridor, Pantages Bays, Cecchini Ranch), the Community Services District may reach an economy
of scale that allows for a more comprehensive provision of municipal services, including flood
protection. Such an option would result in the dissolution of RD 800.
A sub-option would transfer flood protection from DBCSD so that only one agency (RD 800)
provides flood protection. RD 800 has the experience and financial capability to provide this
expanded service. Such a transfer would also allow DBCSD to concentrate on providing municipal
services.
Because it currently operates under the umbrella of RD 800, consideration should be given to
consolidating the Discovery Bay Drainage and Maintenance District into RD 800.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The 2000 residential population within the district was approximately 7,656. Absent any
new development, this number is expected to remain fairly constant, given the significant
build-out within the District portion of the Discovery Bay community, and the continuing
agricultural operations in the remainder of the District.
2) There have been new development proposals contemplated that would affect RD 800. The
Pantages Bays residential project (292 single-family dwellings; population of approximately
BY BURR CONSULTING 77
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
660) is adjacent to the District boundary and would require annexation and an SOI
amendment. The Cecchini Ranch proposal (which is already within the District) would add
between 4,000 and 6,000 new homes with a population of between 9,000 and 13,500 at
build-out.
3) Additional vacant land exists within the countywide urban limit line (ULL), which if
developed, may affect the operations of RD 800.
4) An existing 80-acre parcel on the west boundary (that is within the levee system but outside
the District boundary) should be annexed to the District.
5) An approximate 200-acre portion of the District located adjacent to Byron Highway and
Clifton Court Road is outside the levee system and does not receive District services. This
area should be detached from the District.
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
6) Levees currently provide 100-year flood protection. The goal of the District is to increase
flood protection to meet the 200-year criteria.
7) The District has in place an ongoing levee maintenance and rehabilitation program based on
engineering and geotechnical studies that identify areas that need improvements. The
District expends considerable money (over a half million dollars in FY 06-07) on these
efforts.
8) Municipal services to the unincorporated Discovery Bay community are provided by the
Discovery Bay Community Services District. These include potable water, wastewater, park
and recreation, limited street lighting, and flood protection within Discovery Bay West
Villages 2, 3 and 4.
9) RD 800 provides adequate service to its customers and operates from a solid financial base.
Operating revenues are sufficient to carry out a number of infrastructure improvements.
10) Among the 13 reclamation districts in the County, the RD 800 has the largest budget for
both levee maintenance and rehabilitation activities and provides the highest service level to
its constituents. For FY 07-08, the District expended approximately $9,900 per levee mile
for maintenance, which was the median level of maintenance among all reclamation districts.
11) The most significant service challenges for the District are maintaining the agricultural levees
along Old River, and upgrading the dry land levee on the western boundary.
12) Infrastructure needs for the District include upgrading the levees to meet the 200-year flood
protection criteria.
13) New development within the District is required to meet the FEMA 100-year flood
protection standards.
78 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 800 (BYRON TRACT)
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
14) The District reported that the current level of financing is adequate to provide District
services. Additional funding from the State subventions program will allow the District to
further upgrade the levee system. Absent subvention monies, the District will be limited to
its normal levee maintenance, pump maintenance and dredging activities.
15) Funds are sufficient for the agency to provide full-time staffing. No changes in the existing
staffing level are anticipated.
16) RD 800 benefits from revenues generated by both property tax and landowner assessments.
Under the County allocation, the District receives between 4.7 and 5.1 percent of the
County’s share of property tax, which accounts for 45 percent of the District budget.
17) The District currently assesses property owners $140 per year for each residence and $15 per
acre for agricultural land. The District Board considers these assessments to be appropriate,
and in keeping with the ‘extra services’ the District provides (channel maintenance, water
quality monitoring, navigational aids, and educational programs).
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
18) The District does not practice significant facility sharing. There has been some coordination
with Discovery Bay Community Services District with respect to drainage and treated
effluent discharge to the District’s drainage channels.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
19) Accountability to local voters is an important part of the Board’s outreach activities. Adding
Board agendas and minutes to the District website will enhance these outreach efforts.
20) The Board conducts Board meeting on a regular basis, and encourages residents to
participate.
21) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
22) The District conducts community outreach through the District website, announcements,
posters, and an occasional newsletter. More frequent publication of the newsletter would
assist the outreach efforts.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
BY BURR CONSULTING 79
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
AGENCY PROPOSAL
The District indicated a desire to retain its existing coterminous SOI, noting future potential for
an annexation and SOI amendment should the Pantages Bays project move forward.
SOI OPTIONS
Given the considerations addressed in the MSR, three options are identified for the RD 800
SOI:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained.
SOI Option #2 – Adjust the current SOI
The 80-acre parcel adjacent to the dry land levee should be added to the District SOI and
annexed to the district. The 200-acre parcel adjacent to Byron Highway and Clifton Court Road
should be removed from the SOI and detached from the District.
SOI Option #3 – Add the Pantages Bays project area to the District SOI
In anticipation of approval of the 172-acre Pantages Bays project, add this area to the District
SOI to allow the District to properly plan for services.
RECOMMENDATION
Adoption of Option #2 to adjust the SOI for RD 800 is recommended. The changes in the SOI
can be implemented by LAFCO. Annexation of the 80-acre parcel and detachment of the 200-acre
parcel would need to be initiated by RD 800.
Table 6-4: RD 800 SOI Analysis
Issue Comments
SOI update Adjust the SOI by adding an 80-acre parcel within the levee system and
recommendation subtracting a 200-acre parcel that does not receive District services.
Services provided Levee maintenance and flood control, drainage services, siltation
dredging, and other specialized services on Byron Tract.
Present and planned The community of Discovery Bay and 5,783 acres of agriculture.
land uses in the area Potential for additional residential development along the District
northwest boundary (Pantages Bays project), and large-scale water-
oriented residential and mixed use development east of Discovery Bay
and north of State Highway 4, and which is within the County Urban
Limit Line.
Location of facilities, Levees protecting the District are located around the north, east and
infrastructure and south sides of Byron Tract, within and around the Discovery Bay
natural features community, and with a dry land levee on the interior. Drainage facilities
are located within the Discovery Bay community.
80 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 800 (BYRON TRACT)
Projected growth in the There is the potential for significant growth within District if the
District/Recommended Cecchini Ranch project comes to fruition.
SOI
Present and probable There is a present and probable need for levee and drainage maintenance
need for public facilities services within the District. Levee protection is critical to the continued
and services in the area protection of urban uses and the viability of agricultural lands.
Opportunity for infill Opportunities for infill development are limited within the existing
development rather than Discovery Bay community due to its significant built-out. New
SOI expansion development projects such as Pantages Bays and Cecchini Ranch are
already within the current SOI. SOI expansion to the north, east and
south are constrained by water channels and adjacent reclamation
districts/Clifton Court Forebay. SOI expansion to the west toward
Byron is not constrained.
Service capacity and The District is able to conduct an on-going levee maintenance and
adequacy rehabilitation program (as well as other specialized services) due to its
stable revenue base (property tax and landowner assessments).
Participation in the State levee subvention program and special projects
program add to the District’s service capacity and adequacy.
Social or economic The economic community of interest is the Discovery Bay community,
communities of interest as well as the major agricultural land owners.
Effects on other Because of their proximity to each other, RD 800 and the Discovery Bay
agencies Community Services District may interface with respect to shared
facilities, consolidated purchasing, and governance issuers.
Potential for At some point in the future, urban development (Bixler Road corridor,
consolidations or other Pantages Bays, Cecchini Ranch) will reach an economy of scale that will
reorganizations when benefit the Discovery Bay Community Services District. At that point,
boundaries divide there may be some potential for the reclamation district to consolidate
communities with the Community Services District. Factors such as increased
municipal service needs and funding levels will likely dictate whether this
change is feasible.
Willingness to serve The District has demonstrated a willingness to serve its customers while
transitioning from pure agriculture to mixed urban and agricultural uses.
The Board of Trustees is committed to carrying out the District’s
mission, as has been the case since 1909.
Potential effects on Possible urban development within the Urban Limit Line has the
agricultural and open potential to change agricultural and open space lands within the District.
space lands
Potential environmental Although no potential environmental impacts were identified in the
impacts MSR, the LAFCO counsel and planner should assist the Commission in
making CEQA determinations.
BY BURR CONSULTING 81
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
7. R E C L A M AT I O N D I S T R I C T 8 3 0
( J E R S E Y I S L A N D )
Reclamation District 830 (Jersey Island) provides maintenance services to non-project levees and
internal drainage facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 830 was formed on March 11, 1911 as an independent special district.
The District was formed to provide levee and drainage maintenance services to Jersey Island.109
The principal act that governs the District is the Reclamation District Act.110 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,111 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,112 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,113 and 4) retain an agricultural
expert to advise landowners.114 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.115
The District’s boundary is located entirely within Contra Costa County, consisting of an island
northeast of the City of Oakley and west of Bethel Island, as shown in Map 7-1. The boundaries
encompass approximately 3,500 acres, or approximately 5.5 square miles. Contra Costa is the
principal county and Contra Costa LAFCO has jurisdiction. The District is within the Primary Zone
of the Sacramento-San Joaquin Delta, and is outside of the countywide urban limit line (ULL).
109 The formation date was reported by the District. LAFCO records do not date back to District formation, and RD 830 does not
file with the State Board of Equalization.
110 California Water Code, Division 15, §50000-53903.
111 California Water Code §50932.
112 California Water Code §50910.
113 California Water Code §50933.
114 California Water Code §50952.
115 Government Code §56824.10.
82 PREPARED FOR CONTRA COSTA LAFCO
Map 7-1 D Boundary and Coterminous SOI
R 830
Reclamation District
Levees
City Boundaries
Ú[
Pumping Stations
Bradford Island
Webb Tract
County Boundary
False Riv er
Piper Slough
r
e
n
R
i v Ú[
Jersey
Island Rd
ui
q
a
o Taylor Slough
J
n
a
S
Canal Rd
Jersey Island J
e
rs
e
y
Is
BBeetthheell IIssllaanndd
la
n
d
R d
Taylor
R d
T
a
y
l
o
r
Big S
Break l o
u
g
h
Dutch Slough
d
R
Cr e e k Cypress Corridor sl a n d d R d
M ar s h
H
J er s e y I
otchkiss Tract et
h el I sl a n
OOaakklleeyy B
e
v
A
a
·|}þ
ar 4
h
O
E Cypress Rd
St C E Cypress Rd
1 o n
t
r
a
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.25 0.5 1 Miles
County of Contra Costa disclaimer of liability for geographic information.
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries.116
Boundary History
LAFCO records indicate that there have been no boundary changes for RD 830 since 1965.117
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a three-member board. For contested elections, board members are
elected by landowners to staggered four-year terms, with each voter entitled to cast one vote per
acre owned within the district. The District reported that there have been no recent contested
elections. All board members are employees of Ironhouse Sanitary District (ISD), which is the
majority landowner on Jersey Island, and are not compensated by RD 830.
Uncontested vacancies on the governing body are filled by appointment by the Board of
Supervisors. The District meets on an as-needed basis, with between eight and 10 meetings held per
year.
Table 7-1: RD 830 Governing Body
Reclamation District 830 (Jersey Island)
Governing Body
Name Position Began Serving Term Expires
Marc Haefke Secretary 2005 2009
Members
Dennis Nunn Treasurer 1995 2011
Thomas Williams President 2000 2011
Manner of Selection Landowner elections
Length of Term Four years
Date: As needed Location: 450 Walnut Meadows Drive
Meetings
Oakley, CA 94561
Agenda Distribution Posted on island and at office
Minutes Distribution At office and by request
Contact
Contact Reclamation District Trustee
Mailing Address P.O. Box 1105, Oakley CA 94561
Email/Website NA
The District’s constituent outreach activities consist of posting notices at Jersey Island (on the
County road just over the bridge, and at the corner of Ferry Road and Jersey Island Road), and at
the District office. The District does not maintain a website. Because there are only two
landowners within the District, constituent outreach efforts are limited and complaints are rare. The
District reported that no complaints were received in FY 07-08. Complaints would typically be
raised and addressed at board meetings.
116 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
117 Contra Costa LAFCO records begin in 1965 and show no boundary changes to RD 830.
84 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 830 (JERSEY ISLAND)
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
interview and document requests.
SERVICE DEMAND AND GROWTH
Access to the District is via Jersey Island Road. Jersey Island Road traverses the central portion
of the District in a northwesterly direction, and the eastern boundary of the island adjacent to Taylor
Slough, until ending at the ferry terminal in the northeast corner of the island. Private levee roads
provide perimeter access around other portions of the island, and private agricultural service roads
provide access to the interior of the island.
The District bounds encompass primarily agricultural and cattle grazing land uses. The majority
of Jersey Island consists of farmland of local importance (approximately 1,860 acres), but also
includes farmland of statewide importance (approximately 680 acres), prime farmland
(approximately 500 acres), and unique farmland (approximately 340 acres).118 Prime farmland is
located in the northern, southern and western ends of the island. There is no Williamson Act
contracted land within the District.
ISD owns 3,450 acres within RD 830, and is the primary landowner. The secondary landowner
within the District is Delta Properties, Inc., which owns approximately 50 acres. These two entities
are the only landowners on Jersey Island.
ISD pumps reclaimed water from the Ironhouse wastewater treatment plant to Jersey Island, for
the irrigation of crops and pasture. ISD grows hay with its reclaimed water on designated fields on
the island (approximately 425 acres) and maintains a beef cattle ranch to graze the remaining island
pastures. Through this process, ISD is able to recycle treated wastewater without piping reclaimed
water to the Delta. Other land uses within the District include subsurface oil and gas exploration,
drilling and pipelines, three high-voltage electric transmission lines (Western Area Power
Administration and Pacific Gas and Electric Company) and recreational uses including hunting and
fishing.
ISD plans to begin discharging treated effluent to the San Joaquin River with expansion of its
wastewater treatment plant, estimated for completion in 2012. Wastewater treatment plant
expansion will require the construction of a new pipeline from the treatment plant, across Dutch
Slough, to the northern end of Jersey Island, and extension of an existing pipeline from the southern
end of Jersey Island to the northern end. Both pipelines would converge in the vicinity of the
existing RD 830 pumping station, and extend approximately 550 feet into the San Joaquin River, for
discharge at a depth of approximately 20 feet mean sea level.119 The District reported that there are
no Regional Water Quality Control Board impacts to the RD due to the WWTP expansion and river
discharge, and that the amount of treated effluent applied on the island will not increase with
WWTP expansion.
118 California Department of Conservation Division of Land Resource Protection, Contra Costa County Important Farmland 2006,
Farmland Mapping and Monitoring Program, 2007.
119 Contra Costa LAFCO, Water and Wastewater MSR for East Contra Costa County, 2007, p. 9-10.
BY BURR CONSULTING 85
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The District considers its customer base to be the two landowners, and multiple easement
holders, within the District. According to the District, there were three residents living on the island
as of December 2008, consisting of the ISD caretaker and his family. The District’s population
density was 0.5 per square mile, compared with a countywide density of 1,318.120 The area has not
experienced significant growth, and does not anticipate changes in service demand in the future.
The island is outside of the countywide urban limit line (ULL), and will persist as an agricultural area
for the foreseeable future.
The District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies. The District provides comment on County planning and land use
issues to the extent that they affect the levees or recreational land uses in the area. The District has a
permit system for land uses that would impact drainage on the island, such as mineral rights
exploration, facility maintenance and/or installation of on-island utilities, any work in or around on-
island drainage ditches, and any non-RD 830 use of the levee and/or levee easement areas.
MANAGEMENT
The District employs no full-time or part-time staff positions. Levee maintenance activities are
primarily performed by ISD staff and billed to the RD.121 The District contracts out for all major
services, including levee rehabilitation projects, engineering services and legal counsel. The RD
Board gives a status report at ISD board meetings, but otherwise meets and conducts business
independently of the ISD Board.
The District conducts evaluations of contractor performance as work is completed. For billing
purposes, ISD staff members complete timesheets that distinguish between ISD work hours and
those billable to the RD. In this fashion, both ISD and RD 830 can track workload and monitor
performance of levee maintenance activities.122 Coordination between ISD and RD 830 is enhanced
by the RD Board members also being ISD employees, including the General Manager and
Administration Service Manager at ISD who serve as the President and Treasurer, respectively, for
RD 830.
The District reported that it does not have a formal levee inspection procedure or create formal
written inspection reports, but does keep a log of written inspection activities. Levee inspections are
performed on a daily basis during rain, wind or high tide events, and informally by ISD employees
throughout the year. DWR also conducts yearly inspections of work performed under the
subventions and special projects programs, but does not conduct overall levee inspections or
certification.
The District reported that it adopts an annual budget, and annually prepares audited financial
statements. The most recent audited financial statement provided to LAFCO by the District was for
FY 07-08. District planning efforts include a five-year capital improvement plan for levee needs and
120 Countywide population density based on 2000 Census data.
121 In FY 07-08, RD 830 reimbursed ISD $377,584 for levee repairs and miscellaneous office expenses.
122 There is no written agreement between ISD and RD 830 for the use of labor and equipment, but because ISD is the primary
landowner within the District there has never been any major billing disputes.
86 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 830 (JERSEY ISLAND)
annual applications to DWR for special projects and subventions funding. The District was in the
process of preparing an updated five-year plan as of the drafting of this report, which it anticipates
having in place by Fall 2009.
FINANCING
The District has demonstrated the financial ability to provide minimally adequate service to
portions of the District. The District reported that its current assessment level typically allows for
maintenance/replacement of approximately one mile of riprap on the water side (at about $350,000)
per year. The remainder of the annual assessment covers expenses related to drainage and utilities,
and other operating expenses. Nearly 10 miles of levees within the District do not meet minimum
levee standards for the Delta; however, the District reported that it plans to rehabilitate these levees
over the next five years using DWR special projects funds.123
Figure 7-1: RD 830 Expenditures, FY 04-05 through FY 07-08
District expenditures fluctuate year to
$3,000,000
year as financing relies on DWR special
projects funding for significant levee $2,500,000
rehabilitation activities. As shown in
$2,000,000
Figure 7-1, expenditures in recent years
have been significant due to DWR special
$1,500,000
projects funding for levee rehabilitation.
Revenue fluctuations have generally $1,000,000
followed the expenditure trend, with
$500,000
higher intergovernmental revenues in FY
05-06 and FY 07-08.
$0
FY 04-05 FY 05-06 FY 06-07 FY 07-08
The District received $3.2 million in
revenues in FY 07-08. RD 830 relied
primarily on DWR special projects funds, assessments and subventions. Special projects funds
generated 70 percent of operating revenue in FY 07-08, assessments generated 16 percent, and
subventions generated 10 percent.124 The District also received four percent of revenue from
interest income. The District has not adopted development requirements, and does not receive
development impact fees, because no development takes place on the island.
Total expenditures for FY 07-08 were approximately $2.8 million, 90 percent of which were for
capital improvements and eight percent was for routine levee maintenance. An additional one
percent of expenditures were associated with pumping station operations, with the remainder spent
on insurance, professional fees, and other miscellaneous purposes. The District spent approximately
$14,800 on maintenance costs per levee mile, compared to a countywide median level of $9,900 per
levee mile.
123 The District reported that it has received over $12 million in DWR subventions and special projects funds since 2000.
124 In FY 07-08, the District levied an assessment rate of $91.48 per acre on agricultural land uses, $457.40 per acre on PG&E and
WAPA electric utility lines, $686.10 per acre on gas easements, $6,861.13 per acre on gas wells, $914.79 per acre on County roadways,
and $9,147.06 per acre on the Delta Ferry Authority. The District evaluates the assessment rate on an annual basis.
BY BURR CONSULTING 87
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The District had approximately $132,861 in net long-term debt at the end of FY 07-08. The
long-term debt consists of a loan for financing a D6 caterpillar.
The District has a target of setting $50,000 per year aside as reserves. The District had total net
assets of approximately $1.1 million at the end of FY 07-08.125 In other words, RD 830 maintained
nearly seven months of working reserves, relative to average expenditures in the three most recent
fiscal years.
Table 7-2: RD 830 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
In FY 07-08, reclamation services were financed by intergovernmental revenues (61%) and assessments (35%).
Development Fees and Requirements
Agricultural (per acre) NA
Residential (per unit) Single Family: NA Multi-Family: NA
Non-residential (per 1,000 sq. ft.)Commercial: NA Industrial: NA
Development Requirements: NA
RD 830 Audited Financial Statements
Revenues FY 06-07 FY 07-08 Expenditures FY 06-07 FY 07-08
Total $1,226,002 $3,211,794 Total $960,005 $2,832,411
Property Tax $0 $0 Operations $916,809 $263,204
Assessments $435,175 $502,243 Drainage & Utilities1 $41,103 $26,097
Intergovernmental Revenues $745,496 $2,572,949 Levee Maintenance2 $875,706 $237,107
Levee Maintenance $534,400 $326,597 Capital Improvements3 $0 $2,535,907
Capital Improvements $211,096 $2,246,352
Administrative4
$838 $1,314
Development Impact Fees $0 $0 Professional Fees5 $30,136 $15,255
Interest $44,331 $136,087 Insurance $11,056 $13,508
Other Revenues $1,000 $515 Miscellaneous $1,166 $3,223
Note:
(1) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(2) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(3) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(4) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(5) Legal and accounting services.
125 Total net assets in FY 07-08 consisted of a deficit of $901,918 in unrestricted net assets and over $2.0 million in assets that were
temporarily restricted, consisting of advances received from DWR.
88 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 830 (JERSEY ISLAND)
RECLAMATION SERVICE
NATURE AND EXTENT
RD 830 provides maintenance services to non-project levees and internal drainage facilities on
Jersey Island. ISD maintenance workers conduct most routine levee maintenance activities, such as
vegetation removal, weed abatement, rodent control, and upkeep of access roads, and bill equipment
and service charges to the RD. The District is also responsible for flood fighting and levee patrol
during heavy rain, wind and high tide events, which are also performed by ISD workers. Major
levee rehabilitation projects are performed by contract.
LOCATION
RD 830 provides services within its boundary area, the entirety of Jersey Island. The District
does not provide any services outside of Jersey Island.
The island has been determined to be critical to the health of the Delta. Jersey Island is one of
the eight western Delta islands that DWR has identified as critical to control of salinity in the Delta,
protecting water quality to all water users in the state. The District provides statewide benefits
outside its bounds.126
INFRASTRUCTURE
Key infrastructure in the District includes approximately 16 miles of earthen levees with
waterside rock riprap, approximately 15 miles of internal drainage ditches and one pumping station.
The District reports that the levee height meets at least the Hazard Mitigation Plan (HMP) standard
in most areas (14 miles of levees), but does not meet width requirements on about half of the island
(approximately eight miles of levees).127 The highest priority areas for levee rehabilitation are located
in the northern portion of the District along the San Joaquin River/False River segment and in the
southwestern portion of the District along the Dutch Slough segment. Portions of these levees
require crest widening (of an additional one to three feet) and elevation increase (up to an additional
15 inches) in order to achieve levee height of two feet over the 100-year flood elevation.
According to DWR, there have been four inundation occurrences on Jersey Island since 1900.128
The District reported that there have been no recent levee failures; however, a storm event in early
2006 required an expenditure of approximately $540,000 over the course of three days to fight
flooding and keep the levees safe.
The District reported that subsidence has occurred on the island. Jersey Island has experienced
subsidence at a rate of one half-inch to one inch annually, which the District compensates for by
126 Water Code §12311.
127 For a detailed explanation of levee standards and specifications, please refer to chapter 4.
128 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 7.
BY BURR CONSULTING 89
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
overbuilding the levees.129 Surface elevations range from sea level to approximately 15 feet below
sea level.130 The base flood elevation, which is the anticipated water level in a 100-year flood
occurrence, is seven feet above mean sea level. In other words, the entire island would be covered
by 7-22 feet of water in a 100-year flood event. Hence, the entire island is presently classified by
FEMA as being within the 100-year floodplain.
Rehabilitated levees are built one foot above the HMP standard, or in other words, two feet
above the 100-year flood level. The District reported that a total of six miles have been rehabilitated
to the standard of two feet over the 100-year flood level, and 10 miles are left to be rehabilitated.
Based on previous rehabilitation work, the District estimates that upgrades to existing levees will
cost between $1 million to $1.5 million per levee mile.
In addition to levee height, rehabilitation measures include widening the levee crest from 16 feet
to 18 feet, and adding a wide toe berm to buttress the landside slope for better stabilization.
Rehabilitation of the remainder of the levees is anticipated to occur over the next five years through
DWR special projects funding. An additional infrastructure need for the District is to relocate the
pump station, as the existing pump station is located in the toe of the existing levee, where the levee
needs to be widened.
Figure 7-2: RD 830 Taylor Slough Levee
129 Subsidence rates are not uniform throughout Delta islands. Although levees and exterior island portions do experience
subsidence, subsidence tends to be most severe in the central portion of an islands, creating a “bowl” shape.
130 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 6.
90 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 830 (JERSEY ISLAND)
Table 7-3: RD 830 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance By contract with ISD Weed Abatement By contract with ISD
Flood Control By contract with ISD Slope Protection By contract with ISD
Drainage By contract with ISD Vector/Rodent Control By contract with ISD
Upkeep of Levee Access Roads By contract with ISD Levee Patrol By contract with ISD
Irrigation Water None Flood Fighting By contract with ISD
District Overview
Total Levee Miles 16.0 Surface Elevation 0 to -15 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 9.7 Dry Land Levee 0.0
HMP Standard 6.3 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 16.0
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes - 15 miles Pump Station(s) Yes - 1
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A30 Base Flood Elevation 7 ft.
Levee Inspection Practices
The District does not conduct formal levee inspections or keep written inspection reports. Informal levee
inspections are conducted by ISD employees. Levee inspections are performed daily during severe weather
events.
Levee Inspection Reports
Most Recent Written Inspection NP Inspection Rating NP
Levee Segment Description Condition1
Dutch Slough Along southern District boundary 5.6 miles need rehabilitation
San Joaquin/False River Along northern boundary 2.6 miles need rehabilitation
Piper Slough/Taylor Slough Along eastern District boundary 1.5 miles need rehabilitation
Levee Maintenance
Miles Rehabilitated, FY 07-08 6.3 Miles Needing Rehabilitation 9.7
% Rehabilitated, FY 07-08 39% % Needing Rehabilitation 61%
Rehabilitation Cost per Levee Mile2 $402,525 Maintenance Cost per Levee Mile3 $14,819
Infrastructure Needs/Deficiencies
Levee rehabilitation is needed on nearly 10 miles of levees. Highest priority areas are in the northern portion
of the District along the San Joaquin River/False River segment, and in the southwestern portion of the
District along the Dutch Slough segment. Other infrastructure needs include the relocation of the pump
station, as the current location suffers from subsidence.
Notes:
(1) Levee condition and rehabilitation needs are as reported by RD 830 as of March 2009.
(2) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number of
miles rehabilitated in FY 07-08.
(3) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 91
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
The MSR did not identify any new governance alternatives for RD 830. The District indicated
that it would not be interested in consolidation with neighboring reclamation districts because there
are no compatible districts nearby.
The District reported that the primary reason for opposing consolidation with neighboring
agencies is that RD 830 levees are in overall good condition, and the District does not wish to take
on liability for other possibly substandard levees. The District also expressed concern that financing
levels by neighboring providers would not be sufficient to maintain service levels. Furthermore,
being a nearly single-landowner District, RD 830 indicated that it would not be in favor of
consolidation involving residential populations, such as those found on Hotchkiss Tract and Bethel
Island. Despite the fact that neighboring districts are providing the same service, what is being
protected and how it is being protected varies significantly from island to island, and the District
does not believe neighboring providers are a good match for consolidation.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The 2008 residential population within the district was 3 individuals. There has been no
recent growth within the District, and no anticipated growth in the future. The District is
outside of the countywide urban limit line (ULL), and will remain agricultural for the
foreseeable future.
2) Growth-related impacts on the island include the expansion of the ISD wastewater
treatment plant. Expansion of the plant will require extension of an existing pipeline and
construction of a new pipeline from the southern end of Jersey Island to the northern end.
The District reported that RD 830 will not be impacted by NPDES permitting through
RWQCB for expansion of the WWTP.
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
3) Jersey Island is one of the eight western Delta islands that DWR has identified as critical to
control of salinity in the Delta, protecting water quality to all water users in the state.
4) Over six miles of levees within the District currently meet the HMP standard and nearly 10
miles do not. The 10 miles not meeting HMP standard are in need of rehabilitation,
including increasing levee height to two feet above the 100-year flood elevation and
widening the levee crest to 18 feet.
92 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 830 (JERSEY ISLAND)
5) The District reported that 14 miles of levees meet the HMP height standard of at least one-
foot of freeboard above the 100-year flood level, but eight miles do not meet the width
requirement of the HMP standard.
6) The District report that adding a wide toe berm to buttress the landside slope of the levees is
an infrastructure need that is anticipated to be addressed within the next five years through
DWR special projects funding.
7) The area of the District’s pump station requires relocation due to the need for levee
widening in the area.
8) Public services being provided by other service providers include routine levee maintenance
activities performed by ISD workers, and billed to RD 830.
9) The District is able to provide adequate service due to DWR special projects and
subventions funding, and as-needed maintenance services provided by ISD staff.
10) The District spent approximately $14,800 on maintenance costs per levee mile, compared to
a countywide median level of $9,900 per levee mile.
11) The District reported that the most significant service challenge is obtaining funding for
needed maintenance and rehabilitation activities.
12) The District has a capital improvement plan that was last updated in 2007. The District
reported that a new five-year plan will be in place by Fall 2009.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
13) The District has demonstrated the financial ability to provide minimally adequate service to
portions of the District. Nearly 10 miles of levees within the District do not meet minimum
levee standards for the Delta; however, the District reported that it plans to rehabilitate these
levees over the next five years using DWR special projects funds
14) The District has not adopted development requirements, and does not receive development
impact fees, because no development takes place on the island.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
15) Efficiencies are gained by collaboration and facility sharing efforts with ISD for the use of
equipment and staff for levee maintenance activities. Coordination between ISD and RD
830 is enhanced by the General Manager and Administration Service Manager at ISD serving
as the President and Treasurer on the RD 830 Board.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
16) Accountability to local landowners is achieved by having a close working relationship with
ISD, the primary landowner. Current RD Board members are also ISD employees,
BY BURR CONSULTING 93
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
including the Administration Service Manager at ISD who serves as Treasurer for the
District and the ISD General Manager who serves as the District President.
17) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
AGENCY PROPOSAL
The agency reported a desire to retain its existing coterminous SOI.
SOI OPTIONS
Given the considerations addressed in the Municipal Service Review, the only SOI option
identified for RD 830 is to retain the existing coterminous SOI.
RECOMMENDATION
Retaining the existing coterminous SOI is recommended for RD 830.
Table 7-4: RD 830 SOI Analysis
Issue Comments
SOI update Retain existing coterminous SOI.
recommendation
Services provided Maintenance services to non-project levees and internal drainage facilities
on Jersey Island.
Present and planned The District bounds encompass primarily agricultural and cattle grazing
land uses in the area land uses. Other land uses within the District include subsurface oil and
gas exploration, drilling and pipelines, three high-voltage electric
transmission lines (WAPA and PG&E), and recreational uses including
hunting and fishing.
Location of facilities, Levees protected by the District are located around the perimeter of Jersey
infrastructure and Island. Internal drainage facilities run down the center of each arm of the
natural features island, and meet at the pumping station located in the northwest of the
District.
Projected growth in the There is no growth projected within the District/SOI.
District/Recommended
SOI
Present and probable There is a present and probable need for levee and drainage maintenance
need for public facilities services on the island. Levee protection is critical to the continued use of
and services in the area the island and protection of the Delta ecosystem.
94 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 830 (JERSEY ISLAND)
Opportunity for infill No SOI expansion is recommended and no development is projected on
development rather than the island.
SOI expansion
Service capacity and The MSR identified financing as the major constraint to levee maintenance
adequacy and rehabilitation efforts; however, the District reported that it has an
effective relationship with DWR for subventions and special projects
funding.
Social or economic The economic community of interest is the Ironhouse Sanitary District, as
communities of interest it is the primary landowner on Jersey Island.
Effects on other Retaining the existing coterminous SOI would have no effect on other
agencies agencies.
Potential for No potential consolidation opportunities were identified. The District
consolidations or other does not wish to take on liability for other possibly substandard levees
reorganizations when when its own levees are in good condition. Furthermore, the District does
boundaries divide not wish to consolidate with an agency with a large residential population,
communities and is concerned that other agricultural islands do not have sufficient
assessments to maintain service levels.
Willingness to serve The District has demonstrated a willingness to serve by providing levee
maintenance to Jersey Island since 1911. ISD has demonstrated a
willingness to collaborate with the District as it is the primary landowner
on the island.
Potential effects on Retaining the existing coterminous SOI would allow the District to
agricultural and open continue to serve its boundary area, which is comprised of agricultural and
space lands open space lands.
Potential environmental Although no potential environmental impacts were identified in the MSR,
impacts the LAFCO counsel and planner should make CEQA determinations.
BY BURR CONSULTING 95
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
8. R E C L A M AT I O N D I S T R I C T 2 0 2 4
( O RWO O D A N D PA L M T R AC T S )
Reclamation District 2024 (Orwood and Palm Tracts) provides maintenance services to non-
project levees and internal drainage facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2024 was originally formed on April 15, 1918 as an independent
special district.131 The District consisted of Orwood Tract, and was formed to provide drainage,
irrigation and complete reclamation of lands within District boundaries. In 1995, RD 2036 (Palm
Tract) was dissolved and the area was annexed to RD 2024.132 The original three-member Board of
Trustees for each District was expanded to the current five-member Board serving both tracts.
The principal act that governs the District is the Reclamation District Act.133 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,134 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,135 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,136 and 4) retain an agricultural
expert to advise landowners.137 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.138
The District’s boundary is located entirely within Contra Costa County, and consists of Orwood
Tract and Palm Tract adjacent to the Contra Costa-San Joaquin County line at Old River, as shown
131 The formation date was reported by the District. LAFCO records do not date back to District formation, and RD 2024 does not
file with the State Board of Equalization.
132 LAFCO Resolution No. 95-9. Upon dissolution of RD 2026, all of the facilities and other property owned by RD 2026 were
transferred to RD 2024.
133 California Water Code, Division 15, §50000-53903.
134 California Water Code §50932.
135 California Water Code §50910.
136 California Water Code §50933.
137 California Water Code §50952.
138 Government Code §56824.10.
96 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS)
in Map 8-1. The boundaries encompass approximately 6,574 acres, or approximately 5.5 square
miles. Contra Costa is the principal county and Contra Costa LAFCO has jurisdiction. The District
is within the Primary Zone of the Sacramento-San Joaquin Delta, and is outside the countywide
urban limit line (ULL).
The SOI for the District was adopted in 1984 to be coterminous with District boundaries. 139
The SOI was updated in 2005 to be consistent with the district boundary following the
reorganization involving the RD 2026 (Palm Tract) boundary area.140
Boundary History
The LAFCO record for RD 2024 consists of a single action. In 1995, a reorganization occurred
that annexed the RD 2026 (Palm Tract) boundary area to RD 2024.141 The purpose of the
reorganization was to “consolidate the two agencies into one, thereby streamlining their services.”142
Contra Costa LAFCO records do not indicate any subsequent annexations or detachments from
the District.143
139 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
140 LAFCO Resolution No. 95-9.
141 Ibid.
142 LAFCO Executive Officer’s Report dated June 7, 1995, attached to Resolution No. 95-9.
143 Contra Costa LAFCO records begin in 1965 and show no boundary changes to RD 2024 except the addition of Palm Tract.
BY BURR CONSULTING 97
Map 8 - 1 R D 2024 Boundary and Coterminous SOI
Reclamation District
Holland Tract
Levees
Holland Tract Rd
City Boundaries
Ú[
Pumping Stations
gh
County Boundary
Ú[
d
t
u
Veale Tract C
O
l
d
R
i
v
Ú[ e
r
r
e
g
d
e
r
D
Ú[
PALM TRACT
r
Bixler Tract e
n
r
e
W
BN & SF Railroad
Orwood Rd
W
e
r
n Ú[ ORWOOD TRACT Ú[
e
Er
x
tD
e n r e O
sd l d
d
i
o
g
e R
R nr i v
C e
e r u r
t
Indian Slough
Ú[
DDiissccoovveerryy BBaayy
Byron Tract
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.25 0.5 1 Miles
County of Contra Costa disclaimer of liability for geographic information.
RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS)
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a five-member board. Board members are elected by landowners to
staggered four-year terms, with the number of votes determined by the annual assessment paid by
each landowner. RD 2024 board members serve on a volunteer basis and do not receive
compensation. There is currently one vacancy on the Board, and no candidate has expressed
interest in filling that position.144 Uncontested vacancies on the governing body are filled by
appointment of the County Board of Supervisors. Mailed ballots are utilized for any contested
elections, with such elections very rare.145
The District Trustees meet on an ‘as needed’ basis, with around four meetings held per year.
Meetings are normally held in the conference room of the District Secretary located at 235 E. Weber
Avenue in Stockton.
Table 8-1: RD 2024 Governing Body
Reclamation District 2024 Orwood and Palm Tracts
Governing Body
Name Position Began Serving Term Expires
Robert Cecchini Member 1999 2011
John R. Jackson Member 2007 2011
Members
George S. (Stan) Nunn Member 2005 2009
Don Wagenet President 1997 2009
Vacant Member
Landowner elections. Board member must be a landowner or legal
representative of a landowner within the District. For uncontested
Manner of Selection
elections, appointments are made by the County Board of Supervisors; for
contested elections, mailed ballots are utilized.
Length of Term Four years
Meetings Date: As needed Location: 235 E. Weber Avenue
(Usually quarterly) Stockton, CA
Agenda Distribution As requested. Agendas are mailed to each Landowner.
Minutes Distribution As requested. Minutes are mailed to each Landowner.
Contact
Contact District Secretary and Attorney
Mailing Address Nomellini, Grilli & McDaniel PO Box 1461, Stockton CA 95201-1461
Email/Website ngmplcs@pacbell.net/No website
The District conducts constituent outreach through regular mailings to landowners, and by
posting agendas and notices at the District Secretary’s office. A Notice of Annual Assessment is
provided to landowners, published in the newspaper, and posted. The District does not maintain a
website.
144 Interview with Dante John Nomellini, Sr., District Secretary and Attorney, December 4, 2008.
145 Ibid.
BY BURR CONSULTING 99
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
With regard to customer service, complaints or concerns may be filed with the District Secretary
and are placed on a Board Agenda for discussion and/or resolution. There are 18 landowners
within the District, most of whom are actively involved with the District, so formal complaints are
rare. Within FY 07-08 there were no complaints filed.
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
LAFCO map inquiries and document requests.
SERVICE DEMAND AND GROWTH
Access to the District is via Orwood Road from Bixler Road and SR 4 from the south, or Bixler
Road and Chestnut Street in Brentwood from the west. Orwood Road traverses the north side of
Orwood Tract westerly until it terminates at Old River. Private levee roads provide perimeter access
around each tract, and private agricultural service roads provide access to the interior of each tract.
(Refer to Map 8-1.)
There are 18 landowners within the District including agricultural interests and public interests.
The predominant land use (estimated at 95 percent or 6,250 acres) on both tracts is agriculture,
primarily wheat, corn, safflower and grapes. The State Farmland Mapping and Monitoring Program
classifies agricultural land in the District as Prime Farmland (approximately 3,850 acres) and
Farmland of Statewide Importance (2,570 acres). Approximately 2,800 acres within the District are
under Williamson Act contracts. This comprises 45 percent of the agricultural land in the District.
Residential uses are limited to two single-family residences adjacent to Orwood Road at Fallman
Road, and to caretaker and farm worker housing, with each tract providing housing for
approximately 20 workers each. Portions of each tract are dedicated to wildlife habitat and host a
large variety of waterfowl. Cruiser Haven Marina is located at the westerly terminus of Orwood
Road adjacent to Old River. The marina provides covered berths and limited services. Orwood
Resort, a full service marina, is located just west of the District boundary on the south side of
Orwood Road.
Public and quasi-public agencies associated with the District include: East Bay Municipal Utility
District (EBMUD) - whose main aqueduct traverses the District in an east-west direction along the
north side of Orwood Tract; Burlington Northern Santa Fe Railroad (whose tracks traverse the
District in an east-west direction along the south side of Palm Tract); Western Area Power
Administration and Pacific Gas and Electric Company (whose power transmission lines traverse the
District from the northwest portion of Palm Tract to the southeast portion of Orwood Tract); and
Santa Fe Pacific Pipeline, LP (with natural gas transmission lines).
The District considers its customer base to be the 18 landowners. There are approximately 40
resident farm workers in the District, depending on the season, along with eight permanent
residents. The District’s population density is approximately five persons per square mile, compared
with the 2008 countywide density of 1,318. The two tracts have not experienced any growth, and
the District does not anticipate changes in service demand in the future. The District is outside the
countywide urban limit line (ULL) and expects agriculture to remain as the predominant land use for
the foreseeable future.
100 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS)
The District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies. The District does provide comments to the County Community
Development Division on land use and planning issues, especially as they relate to maintaining the
integrity of the levees.
MANAGEMENT
The District employs no full-time or part-time staff positions. The District contracts out for all
major services including legal counsel, engineering services and levee repair and rehabilitation
projects. Projects in excess of $25,000 are competitively bid. Board Member Robert Cecchini is
paid contract services for pump maintenance services.
The District Secretary and District Engineer serve at the pleasure of the Board, the Secretary
having served since 1968. The District Engineer provides evaluation of contractor performance as
work is completed, with regular reports to the Board.
The District does not have a formal levee inspection procedure and does not keep written
inspection reports. District Trustees monitor the levees on a regular basis, and provide continuous
inspections during rain, wind and high-tide events. The District Engineer makes periodic
inspections.
The District adopts an annual budget, and annually has prepared a financial report by an
independent auditor. The most recent audited financial statement provided to LAFCO by the
District was for FY 07-08.
The District does not prepare a long-term capital improvement plan or master plan. The
District’s planning efforts involve required planning for Department of Water Resources (DWR)
reimbursement for levee maintenance and special projects. The recent (September 2008)
Preliminary Geophysical Investigation of both Orwood and Palm Tracts by Argus Technologies will
allow the District to establish priorities for addressing problem areas within the levees, particularly
anomalies and voids that are not visible from the surface.
FINANCING
The District has demonstrated the financial ability to provide minimally adequate services in
most of its boundary area. Some levees segments in the Palm Tract do not meet (Hazard Mitigation
Plan (HMP) width standards.146 A periodic contribution by EBMUD is provided to assist RD 2024
in maintaining the levees adjacent to the EBMUD aqueduct.
District expenditures fluctuate year to year as capital needs and development projects vary by
year, and are not regular, ongoing expenses. Expenditures were higher in FY 06-07 and FY 07-08
than in prior years due to increased levee maintenance needs and efforts. Somewhat less
maintenance than usual occurred in FY 05-06, resulting in somewhat lower expenditures than usual.
Revenue fluctuations have generally followed the expenditure trend, with lower intergovernmental
revenues in FY 05-06 than other years due to less maintenance activity that year.
146 For a detailed explanation of levee standards and specifications, please refer to chapter 4.
BY BURR CONSULTING 101
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Figure 8-1: RD 2024 Expenditures, FY 04-05 through FY 07-08
The District utilizes the ‘cash $1,200,000
receipts and disbursement basis’ of
accounting, which is a comprehensive $1,000,000
basis of accounting other than the
$800,000
accounting principles generally accepted
in the United States. This method $600,000
recognizes revenues when received and
expenditures when paid. $400,000
$200,000
The District received $505,808 in
revenues in FY 06-07 and $912,886 in
$0
FY 07-08. RD 2024 relies primarily on
FY 04-05 FY 05-06 FY 06-07 FY 07-08
landowner assessments which normally
generate 63 percent of operating
revenues, and reimbursements from the State under the subventions program (37 percent). The
direct contribution by EBMUD ($250,000 in FY 07-08) allows for additional levee maintenance
projects. The District does not receive any property tax revenue. The District levied assessments of
$50 per acre in FY 07-08. If additional funds were contributed by the other non-landowners
(Burlington Northern Santa Fe Railroad, Pacific Gas and Electric Company, Santa Fe Pacific
Pipeline) the District would be able to increase its efforts to improve its levees to the PL 84-99
Standard.147
Total expenditures for FY 06-07 were $886,723 and for FY 07-08, a total of $1,097,257, which
are detailed in Table 8-2. A majority of the District’s costs have been for levee maintenance and
drainage services (pump maintenance and electricity). For FY 07-08, the District spent $184,371
more than it derived in revenues, necessitating a transfer of that amount from reserves. With that
transfer, the reserve account stood at $438,758 on June 30, 2008. The District spent approximately
$62,800 on maintenance costs per levee mile in FY 07-08, compared to a countywide median level
of $9,900 per levee mile.
The District does not have any long-term debt, nor does it have a formal policy on maintaining
financial reserves. Because of the time lag in receiving reimbursements from the State Delta Levee
Subventions Program, the District must normally accrue funds over a period of time or take out a
loan in order to carry out larger capital improvement projects. The District currently utilizes a short-
term (four-year) draw account from the Bank of Stockton if additional funds are required
temporarily.
All capital improvements on the levee system are coordinated through the District Engineer.
However, for the past two years, levee activity has been limited to repair and maintenance only. No
rehabilitation work has occurred.
147 Interview with Dante John Nomellini, Sr., District Secretary and Attorney, December 4, 2008.
102 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS)
Table 8-2: RD 2024 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
Reclamation services are financed primarily by assessments (63%) and DWR subventions (37%).
Development Fees and Requirements
Agricultural (per acre) None
Residential (per unit) Single Family: None Multi-Family: None
Non-residential (per 1,000 sq. ft.)Commercial: None Industrial: None
Development Requirements: None
RD 2024 Audited Financial Statements
Revenues FY 06-07 FY 07-08 Expenditures FY 06-07 FY 07-08
Total $505,808 $912,886 Total $886,723 $1,097,257
Property Tax 0 0 Operations 693,087 1,046,827
Assessments 319,535 319,535 Drainage & Utilities² 88,460 130,011
Intergovernmental Revenues 186,273 342,971 Levee Maintenance³ 604,624 916,816
Levee Maintenance 186,273 342,971 Capital Improvements⁴ 0 0
Capital Improvements 0 0 Administrative⁵ 2,775 1,241
Levee Participation Program¹ 0 250,000 Professional Fees⁶ 182,353 32,793
Interest 0 0 Insurance 8,266 12,369
Other Revenues 0 380 Miscellaneous⁷ 245 4,027
Notes:
(1) Participation fee paid by East Bay Municipal Utility District.
(2) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(3) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance expenditures
are those that are necessary to maintain the levee to its existing standard of protection.
(4) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing a
cross-section, engineering studies, etc.).
(5) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(6) Legal and accounting services.
(7) Miscellaneous expenditures not specified.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2024 provides maintenance services to non-project levees and internal drainage services.
The District conducts or contracts for vegetation removal, weed abatement and vector/rodent
control, and upkeep of access roads as part of its levee maintenance work. The District is also
responsible for flood fighting and levee patrol during high-water events. Large capital
improvements (such as levee rehabilitation) are awarded to private firms under a competitive bid
process.
BY BURR CONSULTING 103
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
LOCATION
RD 2024 provides services within its boundary area, and to the toe of perimeter levees on both
water and land sides. The District’s planning area consists of Palm Tract (2,436 acres) on the north,
and Orwood Tract (4,138 acres) on the south.
The MSR did not identify documented benefits of continued reclamation of the tracts for
sustaining the fresh water/saltwater balance and health of the Delta, as the area is not identified as a
critical asset by California Water Code §12311. Hence, the benefit area for the District’s reclamation
activities are confined to the District’s boundary area.
INFRASTRUCTURE
Key infrastructure in the District includes almost 15-miles of levees, as well as internal drainage
channels, six pump stations, and one flood gate. Levees are constructed out of earthen materials
with rock rip rap on the water side. The Indian Slough Segment on Orwood Tract has been
extensively rocked on the water side in order to eliminate wake damage from speedboats entering
and leaving the Discovery Bay development area.
Figure 8-2: RD 2024 Indian Slough Levee
The District reports that existing levees meet
the Hazard Mitigation Plan (HMP) Standard (one
foot above the 100-year flood level) in all areas,
but that portions of Palm Tract do not meet the
minimum top of levee width standard of 16-feet.
The District is within Flood Zone A2, with a base
flood elevation of 8-feet above sea level for
Orwood Tract and 7-feet above sea level for Palm
Tract. Ground elevations within the interior of
each Tract average 10-feet below sea level. This
means the entire area would be covered by 17-18
feet of water in a high-water event. Hence, the
entire District is presently classified by FEMA to
be within the 100-year floodplain.
A Preliminary Geophysical Investigation was conducted by Argus Technologies in September of 2008.
The report identifies anomalies in the levees (voids and fissures). The District Engineer is utilizing
this information to identify future levee repair/rehabilitation projects, including the elimination of
beaver holes.
According to DWR, there have been no levee failures on Palm or Orwood Tracts in the 1967-
2004 period. Likewise, no levee failures or breaches have occurred in the past four years.
The easterly half of Palm Tract and the northeast quadrant of Orwood Tract contain organic
material (peat soils) ranging in depth from 10 to 20 feet. Historically, these areas have experienced
minimal subsidence without any consequences.
A summary of services, facilities and conditions is provided in Table 8-3.
104 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS)
Table 8-3: RD 2024 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Direct & Contract Weed Abatement Direct & Contract
Flood Control Direct & Contract Slope Protection Direct & Contract
Drainage Direct & Contract Vector/Rodent Control Direct & Contract
Upkeep of Levee Access Roads Direct & Contract Levee Patrol Direct & Contract
Irrigation Water None Flood Fighting Direct & Contract
District Overview
Total Levee Miles 14.6 Surface Elevation -10 ft. (average)
Levee Miles by Standard Levee Miles by Type
No Standard 0.0 Dry Land Levee 0
HMP Standard 14.6 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 14.6
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) Yes - 6
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A2 Base Flood Elevation 8-foot (Orwood);
7-foot (Palm)
Levee Inspection Practices
Levee inspections are performed on a regular basis by District Trustees; periodically by the District Engineer.
Levee inspections are performed multiple times per day during severe weather events.
Levee Inspection Reports
Most Recent Written Inspection NP¹ Inspection Rating NP
Levee Segment Description Condition
Palm Tract Werner Dredger Cut Segment Good
Old River Segment Good
Orwood Tract Old River Segment Good
Indian Slough Segment Good
Werner Dredger Cut Extension Segment Good
Levee Maintenance
Miles Rehabilitated, FY 07-08 0.0 Miles Needing Rehabilitation 1.2
Percent Rehabilitated, FY 07-08 0% Percent Needing Rehabilitation 8%
Rehabilitation Cost per Levee Mile¹ NA Maintenance Cost per Levee Mile² $62,800
Infrastructure Needs/Deficiencies
The District is working toward meeting the PL 84-99 Standard for agricultural levees.
Notes:
(1) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number
of levee miles rehabilitated in FY 07-08.
(2) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 105
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
The MSR identified one governance alternatives for RD 2024.
The consolidation of RD 2036 (Palm Tract) into RD 2024 in 1995 accomplished a unified levee
system; efficiency of scale; better service to the railroad, EBMUD and the pipeline company; more
coordination with landowner/farmers; and a more diverse Board of Trustees consisting of five
members.
Consolidation opportunities are limited to adjacent districts with comparable service level needs.
RD 2065 (Veale Tract) is the only such district identified. As RD 2024 is the larger and financially
healthier of the districts, it would be logical for RD 2024 to be the successor agency and for RD
2065 to annex to RD 2024. The MSR recommends that RD 2121 (Bixler) be dissolved, so it would
not be a potential consolidation partner. RD 800 (Byron) is not a potential consolidation partner
due to its urban uses and need for a higher service level than the agricultural RD 2024. RD 2025
(Holland) is not a potential consolidation partner as it receives a higher level of funding due to a
legislative mandate that Holland be protected due to its critical importance for the health of the
Delta. By contrast, protection of Palm and Orwood Tracts is not mandated in Water Code §12311.
Consolidation advantages would include opportunities to achieve efficiencies in planning, to
enhance service levels and professionalism for Veale Tract, and to reduce administrative costs.
Consolidation could also improve RD 2024’s ability to fill a vacancy on the Board of Trustees. As
RD 2065 is hydrologically distinct from RD 2024, there are no common areas of benefit or
opportunities for sharing levee infrastructure directly, although maintenance equipment could be
shared. Perceived disadvantages for consolidation include a reduction in local control for affected
property owners on Veale Tract due to less representation on the District Board, and acceptance of
liability by RD 2024 for levees in RD 2065 where maintenance expenditures have not been as high
as RD 2024.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The 2008 residential population within the district was approximately 48. There has been no
recent growth. Primary residents are farm workers whose numbers fluctuate depending on
the season.
2) There are no planned and proposed developments located within the existing boundary and
SOI of the District. Orwood and Palm Tracts are dedicated to agriculture, are within the
Primary Zone of the Delta, and are outside the countywide ULL.
106 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS)
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
3) Levees currently meet HMP standards in most of its boundary area. Some levees segments
in the Palm Tract do not meet HMP width standards.
4) Future levee repair/rehabilitation projects are identified based on inspections and
geotechnical analysis.
5) The District insures that regional facilities that pass through the District (Burlington
Northern Santa Fe rail line, EBMUD aqueduct, Santa Fe Pacific Pipeline transmission lines)
are protected.
6) The District provides adequate service as reflected in the levee upgrades that have been
accomplished over the past several years. Additional effort has gone into placing additional
rock rip rap on the water side of the Indian Slough levee in order to eliminate wake damage
from boats.
7) The District spent approximately $62,800 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
8) Those portions of Palm Tract levees that do not meet the levee width standard of 16-feet
should be given priority with respect to rehabilitation.
9) The District is working toward additional levee upgrades from the HMP standards to the PL
84-99 Standard for agricultural levees.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
10) The District has demonstrated financial ability to provide minimally adequate service levels.
The direct contribution by East Bay MUD allows for additional levee improvement projects.
11) The District has the ability to increase assessments to landowners if necessary. The present
rate of approximately $50 per acre is relatively low compared to other reclamation districts.
12) The District should consider requesting additional funds from non-property owners who
benefit from the District, similar to the EBMUD contribution.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
13) The District does not practice significant facility sharing, but does work directly with the
agricultural landowners to insure that levee roads, access roads, pumps, and canals are well
maintained.
BY BURR CONSULTING 107
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
14) Accountability is somewhat constrained by limited interest in serving on the governing body,
as indicated by the current Trustee vacancy and the rarely contested elections.
15) The District should take steps to fill the vacant position on the Board of Trustees.
16) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
17) The District does not find it necessary to conduct any community outreach or involvement
activities because all of the 18 landowners are involved in District activities.
18) Consolidation with RD 2065 (Veale) is a government structure option.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
AGENCY PROPOSAL
The District indicated a desire to retain its existing coterminous SOI.
SOI OPTIONS
Given the considerations addressed in this Municipal Service Review, two SOI options were
identified:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
SOI Option #2 – SOI expansion to Veale Tract
SOI expansion for RD 2024 to include Veale Tract would signify that consolidation could be
initiated. If initiated, LAFCO would evaluate consolidation in greater depth and determine whether
or not it is advisable and under what conditions.
RECOMMENDATION
Retaining the existing coterminous SOI is recommended for RD 2024.
108 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2024 (ORWOOD AND PALM TRACTS)
Table 8-4: RD 2024 SOI Analysis
Issue Comments
SOI update Retain the existing coterminous SOI.
recommendation
Services provided Maintenance services to non-project levees and internal drainage facilities
on Orwood Tract and Palm Tract.
Present and planned The District bounds encompass primarily agricultural land. Other land
land uses in the area uses within the District include the East Bay Municipal Utility District
aqueduct, Burlington Northern Santa Fe Railroad tracks, Western Area
Power Administration and Pacific Gas and Electric Company power
transmission lines, and Santa Fe Pacific Pipeline, LP natural gas
transmission lines.
Location of facilities, Levees protected by the District are located around the perimeter of
infrastructure and both Orwood Tract and Palm Tract. Internal drainage facilities and
natural features pump stations serve each tract.
Projected growth in the There is no growth projected within the District/SOI.
District/Recommended
SOI
Present and probable There is a present and probable need for levee and drainage maintenance
need for public facilities services in the District. Levee protection is critical to the continued use
and services in the area of the land for agricultural production, given the land elevation of 10-feet
below sea level.
Opportunity for infill No opportunities presently exist to accommodate infill development.
development rather than Expansion of the SOI to Veale Tract would be to address shortcomings
SOI expansion in RD 2065.
Service capacity and With additional revenue (from either increased assessments or utility
adequacy owner contributions), the District can be well positioned to provide a
high level of service to its constituents.
Social or economic The economic community of interest is the 18 property owners including
communities of interest the agricultural interests and the participating utility owners.
Effects on other Expansion of the SOI to Veale Tract would affect RD 2065; however,
agencies this option is not recommended.
Potential for There is potential to annex RD 2065 (Veale Tract), especially if RD 2065
consolidations or other becomes insolvent or cannot continue to provide services.
reorganizations when
boundaries divide
communities
Willingness to serve The District has demonstrated a willingness to serve by providing levee
maintenance in the area since 1918. The District has demonstrated a
willingness to collaborate with the agricultural and utility landowners in
the District.
Potential effects on Because of its location and the very high quality of soils on both Orwood
agricultural and open and Palm Tracts, agriculture will remain a viable land use.
space lands
Potential environmental Although no potential environmental impacts were identified in the
impacts MSR, the LAFCO counsel and planner should assist the Commission in
making CEQA determinations.
BY BURR CONSULTING 109
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
9. R E C L A M AT I O N D I S T R I C T 2 0 2 5
( H O L L A N D T R AC T )
Reclamation District 2025 (Holland Tract) provides maintenance services to non-project levees,
internal drainage and irrigation facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2025 was formed in 1918 as an independent special district. The
District was formed to provide levee maintenance services. 148
The principal act that governs the District is the Reclamation District Act.149 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,150 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,151 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,152 and 4) retain an agricultural
expert to advise landowners.153 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.154
The District’s boundary is located entirely within Contra Costa County. RD 2025 is a Delta
island located in the eastern portion of the County, northeast of the community of Knightsen, as
shown in Map 9-1. The boundaries encompass approximately 4,090 acres, or approximately 6.4
square miles. Contra Costa is the principal county and Contra Costa LAFCO has jurisdiction. The
District is located within the Primary Zone of the Sacramento-San Joaquin Delta, and is outside of
the countywide urban limit line (ULL).
148 The year of formation was reported by the District. LAFCO records do not date back to District formation, and RD 2025 does
not file with the State Board of Equalization.
149 California Water Code, Division 15, §50000-53903.
150 California Water Code §50932.
151 California Water Code §50910.
152 California Water Code §50933.
153 California Water Code §50952.
154 Government Code §56824.10.
110 PREPARED FOR CONTRA COSTA LAFCO
D Boundary and Coterminous SOI
Map 9-1 R 2025
S
W
r
R d
illow
R d Quimby Island
e
p d H
Pi Sugar Barge Rd a n d S l M o o u u g n h o l l a n
S d
BBeetthheell IIssllaanndd
C
Gateway Rd u
Ú[ t
Ú[
Rd
e
Ston
h Slough
A
s S
p a
e n
n d
R m
d o
u
n
d
B
lv
d Holland Tract
d
n
uh
og
Mu
o
dl
n S Ú[
a
S
H
o O
Hotchkiss Tract
l
l
a
n
ld
R iver
d
Holland Tract Rd C
u
t
Rock Slough
KKnniigghhttsseenn
Delta Rd
Veale Tract
Reclamation District
Levees
City Boundaries
Orwood and Palm Tracts
Ú[
Pumping Stations
County Boundary
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.25 0.5 1 Miles
County of Contra Costa disclaimer of liability for geographic information.
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries.155
Boundary History
LAFCO records indicate that there have been no boundary changes for RD 2025 since 1965.156
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a three-member board. For contested elections, board members are
elected by landowners to staggered four-year terms, with each voter entitled to cast one vote per
acre owned within the district. The District reported that Delta Wetlands Properties—a private, for
profit entity—is the majority landowner within RD 2025, owning approximately three-quarters of
the island. Board members are not compensated by RD 2025.
The District reported that there have been no recent contested elections. Uncontested vacancies
on the governing body are filled by appointment by the Board of Supervisors. A vacant board seat
was filled by appointment in 2006, with the appointee to serve the remainder of the term. The
District meets on an as-needed basis, with approximately four meetings held per year.
Table 9-1: RD 2025 Governing Body
Reclamation District 2025 (Holland Tract)
Governing Body
Name Position Began Serving Term Expires
David A. Forkel Chair 2007 2011
Members
Zelimir Dabelich Trustee 2006 2009
John L. Winther Trustee 2007 2011
Landowner elections. Board member must be a landowner or legal
Manner of Selection
representative of a landowner within the District.
Length of Term Four years
Date: As needed Location: 311 East Main St., Suite 504,
Meetings
Stockton, CA 95202
Agenda Distribution Posted at District office
Minutes Distribution By request
Contact
Contact General Manager
Mailing Address 1660 Olympic Boulevard, Suite 350, Walnut Creek, CA 94596-5111
Email/Website info@deltawetlands.com
The District’s constituent outreach activities consist of posting agendas and notices at the
District office and maintaining an email distribution list for landowner notification. With regard to
customer service, complaints can be raised at board meetings, or by contacting the District general
manager. The District reported that no complaints were received in FY 07-08.
155 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
156 Contra Costa LAFCO records begin in 1965 and show no boundary changes to RD 2025.
112 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2025 (HOLLAND TRACT)
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
LAFCO map inquiries and document requests.
SERVICE DEMAND AND GROWTH
Access to the District is via Delta Road in the southwest of the District, east of the
unincorporated community of Knightsen. Delta Road turns into Holland Tract Road at the
northern end of Holland Tract bridge. Holland Tract Road runs east-west along the southern
border of the District, and north-south along the eastern border of the District. Private levee roads
provide perimeter access around other portions of the island, and private agricultural service roads
provide access to the interior of the island.
The District bounds encompass agricultural and recreational land uses. Local business activities
include cattle grazing operations within the District and marinas located along the Delta waterways,
outside of the levees. The majority of Holland Tract consists of farmland of local importance
(approximately 2,800 acres), but also includes prime farmland along the eastern portion of the island
(approximately 880 acres), and farmland of statewide importance (approximately 320 acres).157
There is no Williamson Act contracted land within the District.
The District considers its customer base to be the 18 landowners within the District. Of the 18
landowners, the District reported that Delta Wetlands Properties owns 75 percent of the island, with
the remaining 25 percent divided among the 17 other landowners.
There were 27 residents in the District, according to 2000 Census data. The District’s
population density was 4.2 per square mile, compared with a countywide density of 1,318. The
island is outside of the countywide urban limit line (ULL), and the District does not anticipate
changes in service demand in the future. The District has not experienced recent growth and does
not anticipate significant growth in the future. The District reported that infill growth is limited to a
maximum of four to five units under current zoning, located along the western side of the island.
Delta Wetlands Properties is the primary landowner on Webb Tract and Holland Tract in
Contra Costa County, and Bouldin Island and Bacon Island in San Joaquin County. Delta Wetlands’
long-term goal is to construct weirs with gates in the Webb Tract and Bacon Island levees, to briefly
divert high flows onto the islands during high tide events, in order to decrease peak tidal elevations
in the central Delta and avoid levee overtopping.158 District studies modeling Delta high tidal flows
project that diverting 100,000 acre-feet of water onto each island during peak tidal elevations could
lower the peak tidal elevation in the central Delta by three to four inches. 159 Water captured during
surplus conditions would be returned to the Delta later in the year and sold for beneficial use (e.g.,
summer export for municipal and industrial use, irrigation, Delta outflow, etc.).160 Holland Tract and
157 California Department of Conservation Division of Land Resource Protection, Contra Costa County Important Farmland 2006,
Farmland Mapping and Monitoring Program, 2007.
158 ICF Jones & Stokes, Delta Wetlands Potential Flood Protection Operations, July 2008, p. 1.
159 Ibid., p. 17.
160 Interview with David Forkel, RD 2025 General Manager, April 21, 2009.
BY BURR CONSULTING 113
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Bouldin Islands would be maintained as wetland and wildlife habitat to mitigate habitat loss from the
flooding of Webb Tract and Bacon Island.
The District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies.
MANAGEMENT
The District does not directly employ any full-time or part-time staff positions. The District
contracts out for all major services, including levee rehabilitation projects, engineering services and
legal counsel. The District conducts evaluations of contractor performance as work is completed.
Efficiencies are gained by the District having an engineer who works for various Delta RDs, because
it allows for easy benchmarking and cost comparisons.
Levee inspections are performed on a daily basis by on-site farmers, and several times per day
during storm events and high tides. The District reimburses farmers for time spent on levee patrols.
If levee maintenance issues are discovered during routine levee patrols, the District engineer is
immediately notified. The District does not keep a comprehensive log of inspection reports, but the
engineer documents maintenance issues as they arise. Oversight and review of levee maintenance
activities is supplemented by the Department of Water Resources (DWR) inspections of work
performed under the subventions and special projects programs.161
The District reported that it adopts an annual budget, and annually prepares audited financial
statements. The most recent audited financial statement provided to LAFCO by the District was for
FY 07-08. District planning efforts include annual applications to DWR for subventions and special
projects funding, and year-end summaries of work performed. The District had not prepared a
multi-year capital improvement plan as of the drafting of this report; however, the District reported
that it plans to complete a five-year plan by December 2009.
FINANCING
Figure 9-1: RD 2025 Expenditures, FY 04-05 through FY 07-08
The District has demonstrated the $700,000
financial ability to provide minimally
$600,000
adequate service. Capital improvements
on the levee system occur primarily $500,000
through DWR special projects funds,
$400,000
whereas routine levee maintenance is
funded by assessments and DWR $300,000
subventions. $200,000
$100,000
District expenditures fluctuate year
to year as financing relies on State $0
funding for significant levee
FY 04-05 FY 05-06 FY 06-07 FY 07-08
161 DWR performs inspections of work funded through the special projects and subventions programs, but does not conduct overall
levee inspections or certification
114 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2025 (HOLLAND TRACT)
maintenance and rehabilitation activities. Expenditures were higher in FY 07-08 than in subsequent
years due to DWR special projects funding for levee rehabilitation. To a lesser extent levee
maintenance needs and efforts also fluctuate somewhat from year to year. Somewhat less
maintenance occurred in FY 05-06 than in prior years, resulting in somewhat lower expenditures
than usual. Revenue fluctuations have generally followed the expenditure trend, with higher
intergovernmental revenues in FY 07-08 than previous years due to a greater volume of
reimbursable capital projects that year.
The District received over $2.3 million in revenues in FY 07-08. RD 2025 relies primarily on
intergovernmental revenues to fund services. DWR special project funds generated 87 percent of
operating revenue in FY 07-08, DWR subventions generated six percent, and assessments generated
six percent. The District levied assessments of approximately $37 per acre in FY 07-08.162 The
District has not adopted development requirements, and does not have development impact fees,
because no development has taken place on the island.
Total expenditures for FY 07-08 were nearly $589,000, 55 percent of which were for capital
improvements, 35 percent for levee maintenance, and five percent for pumping station and canal
maintenance and operations. The District reported that the remainder of the nearly $2 million in
DWR special projects funds was expended in FY 08-09. The District spent approximately $18,750
on maintenance costs per levee mile in FY 07-08, compared to a countywide median level of $9,900
per levee mile.
The District had approximately $250,000 in short-term debt at the end of FY 07-08. The short-
term debt consisted of short-term warrants registered with the Bank of Stockton, used to pay annual
maintenance costs. Short-term warrants mature within one year, and are repaid when DWR issues
subvention reimbursements for the prior fiscal year, typically within six to eight months of the close
of the fiscal year.
The District does not have a formal policy on maintaining financial reserves, and reported that it
typically spends all that it has and does not keep a reserve. The District had a deficit of $43,379 in
unrestricted net assets at the close of FY 07-08; however, had $108,939 in capital assets, consisting
of land and pumps.
162 The District reported that assessments are not indexed for inflation, and all parcels are assessed at a constant rate.
BY BURR CONSULTING 115
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 9-2: RD 2025 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
In FY 07-08, reclamation services were financed by intergovernmental revenues (94%) and assessments (6%).
Development Fees and Requirements
Agricultural (per acre) NA
Residential (per unit) Single Family: NA Multi-Family: NA
Non-residential (per 1,000 sq. ft.)Commercial: NA Industrial: NA
Development Requirements: NA
RD 2025 Audited Financial Statements
Revenues FY 06-07 FY 07-081 Expenditures FY 06-07 FY 07-081
Total $471,879 $2,350,127 Total $352,062 $588,864
Property Tax $0 $0 Operations $327,778 $236,230
Assessments $51,911 $150,454 Drainage & Utilities1 $20,609 $30,569
Intergovernmental Revenues $419,968 $2,199,673 Levee Maintenance2 $307,169 $205,661
Levee Maintenance NP $147,673 Capital Improvements3 $1,273 $325,497
Capital Improvements NP $2,052,000 Administrative4 $2,823 $11,016
Development Impact Fees $0 $0 Professional Fees5 $13,120 $2,300
Interest $0 $0 Insurance $7,068 $6,342
Other Revenues $0 $0 Miscellaneous $0 $7,479
Note:
(1) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(2) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(3) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(4) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(5) Legal and accounting services.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2025 provides maintenance services to non-project levees, internal drainage and irrigation
facilities. Routine maintenance activities include vegetation removal, seepage/irrigation ditch
cleaning, rodent control, roadway maintenance, and repair of waterside erosion. Sheep are allowed
to graze on the levees periodically, for the purpose of vegetation control. The District is also
responsible for flood fighting and levee patrol during high water events.
LOCATION
RD 2025 provides services within its boundary area, the entirety of Holland Tract. The District
does not provide any services outside of Holland Tract.
116 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2025 (HOLLAND TRACT)
The tract has been determined to be critical to the health of the Delta. Holland Tract is one of
the eight western Delta islands that DWR has identified as critical to control of salinity in the Delta,
protecting water quality to all water users in the state. The District provides statewide benefits
outside its bounds.163
INFRASTRUCTURE
Key infrastructure in the District includes nearly 11 miles of earthen levees, as well as eight miles
of irrigation canals and three pumping stations. The District reports that levees meet the Hazard
Mitigation Plan (HMP) standard of one foot above the 100-year floodplain. 164 The District
Engineer reported that all levees are in good condition, only requiring routine maintenance. The
LAFCO site visit identified erosion repair, additional riprap and significant vegetation removal as
infrastructure needs.
Figure 9-2: RD 2025 Rock Slough Levee
Despite the fact that all levees were reported to be in good condition at HMP standard, the
District plans to upgrade all levees beyond HMP for increased levels of flood protection. The
District reported that the HMP standard provides minimal freeboard for overtopping due to high
river flows, high tides and high winds, and the peat foundation on which the levees are built is
constantly subsiding, causing embankment cracking, loss of freeboard and continual maintenance.165
Because levees at the HMP standard are at increased risk for catastrophic levee failure, the District
has a long-term goal of upgrading the levees to DWR Bulletin 192-82 standards to provide a higher
degree of flood protection.166
According to DWR, there has been one inundation occurrence on Holland Tract since 1900.167
The District reported that the most recent levee failure occurred in 1980. The District reported that
163 Water Code §12311.
164 For a detailed explanation of levee standards and specifications, please refer to chapter 4.
165 RD 2026, Letter to U.S. Army Corps of Engineers, January 31, 2006.
166 RD 2026, Delta Levee Subventions Program 2008-2009 Application, June 27, 2008.
167 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 7.
BY BURR CONSULTING 117
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
significant subsidence has occurred on the island, at a rate of approximately one to two inches per
year. Surface elevations range from sea level in the western portion of the District, to between 10
and 15 feet below sea level in the eastern portion of the District. 168 The base flood elevation, which
is the anticipated water level in a 100-year flood occurrence, is seven feet above mean sea level. In
other words, the entire island would be covered by 7-22 feet of water in a 100-year flood event.
Hence, the entire island is presently classified by FEMA as being within the 100-year floodplain.
The first phase of levee rehabilitation will bring levees to PL 84-99 standards, with subsequent
rehabilitation planned to eventually bring the levees up to DWR Bulletin 192-82 standards. The
District plans to begin the first phase of rehabilitating the levee to the PL 84-99 cross-section
standard in FY 08-09, consisting of depositing 150,000 cubic yards of fill throughout the island to
achieve PL 84-99 slope specifications. The District has budgeted $1.7 million for levee
rehabilitation in FY 08-09, including $200,000 in engineering costs. 169 The District expects to
rehabilitate all levees to PL 84-99 standards within five years, assuming State funding stays
consistent.170
The District has also budgeted $220,000 for routine maintenance activities in FY 08-09.171
Nearly half (45 percent) of this amount is for erosion repair or restoration of rock revetment; 23
percent is for addition of gravel to the levee crown and repair of minor slipouts, erosion and
subsidence; 14 percent is for levee inspection and engineering services; nine percent is for spraying,
burning and clearing levee slopes and crown of weeds and brush; and five percent is for cleaning of
seepage and irrigation ditches which are adjacent to the landside levee toe.
168 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 6.
169 Reclamation District No. 2025 Delta Levee Subventions Program, 2008-2009 Application.
170 Interview with Gilbert Cosio, RD 2026 Engineer, April 20, 2009.
171 Reclamation District No. 2025 Delta Levee Subventions Program, 2008-2009 Application.
118 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2025 (HOLLAND TRACT)
Table 9-3: RD 2025 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance By Contract Weed Abatement By Contract
Flood Control By Contract Slope Protection By Contract
Drainage By Contract Vector/Rodent Control By Contract
Upkeep of Levee Access Roads By Contract Levee Patrol By Contract
Irrigation Water None Flood Fighting By Contract
District Overview
Total Levee Miles 11.0 Surface Elevation 0 to -15 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 0.0 Dry Land Levee 0.0
HMP Standard 11.0 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 11.0
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes - 8 mi. Pump Station(s) Yes - 3
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A30 Base Flood Elevation 7 ft.
Levee Inspection Practices
Levee inspections are performed on a daily basis by on-site farmers, but no written inspection reports are
created. Levee inspections are performed multiple times per day during severe weather events.
Levee Inspection Reports
Most Recent Written Inspection NA Inspection Rating NA
Levee Segment Description Condition
Old River/Holland Cut Eastern District boundary 3.96 mi. at HMP
Sand Mound Slough Western District boundary 4.6 mi. at HMP
Rock Slough Southern District boundary 2.41 mi. at HMP
Levee Maintenance
Miles Rehabilitated, FY 07-08 1.5 Miles Needing Rehabilitation1 11.0
% Rehabilitated, FY 07-08 14% % Needing Rehabilitation 100%
Rehabilitation Cost per Levee Mile2 $216,998 Maintenance Cost per Levee Mile3 $18,748
Infrastructure Needs/Deficiencies
Rehabilitation of the entire levee system is needed to meet PL 84-99 standards. The District plans to begin the
first phase of rehabilitating the levee to the PL 84-99 cross-section standard in FY 08-09.
Note:
(1) To achieve the District's short-term goal of PL 84-99 standards.
(2) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number of
miles rehabilitated in FY 07-08.
(3) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 119
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
The MSR identified consolidation of RD 2025 (Holland Tract) and RD 2026 in Contra Costa
County and RD 756 (Bouldin Island) and RD 2028 (Bacon Island) in San Joaquin County as a
possibility. Delta Wetlands Properties is the single landowner on RD 2026 (Webb Tract), RD 756
(Bouldin Island) and RD 2028 (Bacon Island), and is the majority landowner in RD 2025 (Holland
Tract). Delta Wetlands’ long-term goal is to flood Webb Tract and Bacon Island as part of a surface
water storage project, and maintain Holland Tract and Bouldin Islands as wetland and wildlife
habitat to mitigate habitat loss from the flooding of the other two islands. The District reported that
levee maintenance activities will continue to be needed on the levee system of these islands even
after the water storage facilities and habitat mitigation sites have been established. Consolidation of
these four RDs would allow for levee maintenance services on all islands in the Delta Wetlands
project to be provided by a single entity, which would increase accountability and efficiency.
In the event of consolidation of all four Districts, Contra Costa LAFCO would be considered
principal LAFCO due to there being a greater amount of assessed value in Contra Costa County.
Assessed value in FY 07-08 in Contra Costa County was $27.6 million compared to $23.2 million in
San Joaquin County, according to the respective counties. Should consolidation efforts proceed, it is
recommended that RD 2025 (Holland Tract) serve as the successor agency, because it is the only
island where Delta Wetlands Properties is not the sole property owner, and it would be a more
natural transition for the other property owners on Holland Tract.
The District reported that, in principle, it is not interested in consolidation because each district
faces its own set of independent flood risks and facility needs. From a risk management perspective,
consolidation is difficult because one district (or landowner) does not want to take responsibility for
the levees of another. In addition, the District reported that it does not view the legal and
administrative costs and efforts associated with consolidation as likely to outweigh any increased
efficiencies from consolidation. The District reported that all four RDs are already served by the
same General Manager, engineer and legal counsel, and does not anticipate that many new
efficiencies would be gained by consolidation. The District expressed concern that RD 2025
(Holland Tract) would be particularly difficult to consolidate, given that Delta Wetlands Properties is
not the sole landowner on the tract.
120 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2025 (HOLLAND TRACT)
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The residential population within the district was 27, according to the 2000 Census. There
has been no recent growth within the District, and minimal growth is anticipated in the
future as the District is outside of the countywide urban limit line (ULL). Growth is limited
to potential infill development of four or five units based on current zoning.
2) The long-term goal for the island is to become a dedicated wetland and wildlife habitat;
however, farming operations are anticipated to continue in the southwestern portion of the
island.
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
22) Holland Tract is one of the eight western Delta islands that DWR has identified as critical to
control of salinity in the Delta, protecting water quality to all water users in the state.
3) All levees within the District currently meet HMP standards but do not provide 100-year
flood protection. The District reports that the capacity of the levees at HMP standard is
inadequate, and the levees must be rehabilitated to meet PL 84-99 standards at a minimum,
and Bulletin 192-82 standards in the long-run.
4) The District plans to begin the first phase of rehabilitating the levees to PL 84-99 standards
in FY 08-09. The District expects to rehabilitate all levees to PL 84-99 standards within five
years, assuming State funding stays consistent. A long-term goal of the District is to upgrade
all levees to Bulletin 192-82 standards, but this is dependent upon available funding from
DWR.
5) All levee maintenance and rehabilitation projects are performed by contract. The District
has no staff positions, but reimburses on-site farmers for routine maintenance work.
6) The District provides minimally adequate service given financial and staffing constraints.
The District spent approximately $18,750 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
7) The District reported that the most significant service challenge is obtaining funding for
needed maintenance and rehabilitation activities, and adequate levee maintenance would not
be possible without DWR funding.
8) The District did not have a capital improvement plan in place as of the drafting of this
report; however, the District indicated that it will have one in place by December 2009.
BY BURR CONSULTING 121
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
9) The District has demonstrated the financial ability to provide minimally adequate service;
however, it plans to provide increased service levels beginning in FY 08-09, subject to
financial assistance from DWR.
10) The District reported that the current level of financing is generally not sufficient for
adequate service provision, and major maintenance and rehabilitation activities are only
possible with DWR funding.
11) Funds are insufficient for the agency to provide full-time staffing.
12) The District should consider adopting an assessment that increases with inflation.
13) The District has not adopted development requirements, and does not receive development
impact fees, because no development has taken place on the island.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
14) RD 2025 shares administrative facilities with RD 2026 (Webb Tract) in Contra Costa
County, and RD 756 (Bouldin Island) and RD 2028 (Bacon Island) in San Joaquin County.
Efficiencies are gained by having the same General Manager serve each RD.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
15) Accountability to local landowners is achieved by the District having a close working
relationship with Delta Wetlands Properties, the majority landowner on the island. The
General Manager of the District is also the Delta Wetlands Project Manager.
16) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
17) District community outreach efforts include maintaining an email contact list for landowner
updates and notifications.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds.
AGENCY PROPOSAL
The agency reported a desire to retain its existing coterminous SOI.
122 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2025 (HOLLAND TRACT)
SOI OPTIONS
Given the considerations addressed in the MSR, two options are identified for the RD 2025
SOI:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
SOI Option #2 – SOI expansion to signal consolidation with RD 2026, RD 756 and RD 2028
SOI expansion for RD 2025 to signal consolidation with RD 2026 (Webb Tract) in Contra Costa
County, and RD 756 (Bouldin Island) and RD 2028 (Bacon Island) in San Joaquin County is a
possibility. All four islands are part of the proposed Delta Wetlands Project, which would eventually
convert Webb Tract and Bacon Island to surface water storage facilities, and maintain Holland Tract
and Bouldin Islands as wetland and wildlife habitat to mitigate habitat loss from the flooding of the
other two islands. Delta Wetlands is the majority property owner of each of the islands, and the
Delta Wetlands Project Manager serves as the General Manager for each of the four RDs, so
consolidation would seem to be a natural fit.
RECOMMENDATION
Retaining the existing coterminous SOI is recommended for RD 2025. Although consolidation
of all four districts in the proposed Delta Wetlands Project would allow for future levee maintenance
services to be provided by a single entity, consolidation itself would bring few efficiencies to the
Districts, and would create significant problems from a risk management standpoint.
Table 9-4: RD 2025 SOI Analysis
Issue Comments
SOI update Retain existing coterminous SOI.
recommendation
Services provided RD 2025 provides maintenance services to non-project levees, internal
drainage and irrigation facilities. Comparable services are provided by RD
2026, RD 759 and RD 2028.
Present and planned Present land uses within all four RDs are agricultural in nature. The Delta
land uses in the area Wetlands Project calls for RDs 2026 and 2028 to be flooded, to serve as
surface water storage facilities, and RDs 2025 and 759 to be managed as
wetland and wildlife habitat. Under this scenario, land uses in RDs 2025
and 759 would include seasonal managed wetlands, emergent marsh,
seasonal ponds and lakes, crops (hay, grains, corn, and wheat), mixed
agriculture/seasonal wetlands, riparian, and grasslands. Private agricultural
and commercial operations would persist in the southwest portion of RD
2025 (Holland Tract).
BY BURR CONSULTING 123
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Location of facilities, Levees protected by the Districts are located around the perimeter of the
infrastructure and islands. Internal drainage facilities run north-south and east-west through
natural features the Districts. One RD 2025 pump station is located on the northern
segment of the District and two are located along the eastern segment, and
RD 2026 pump stations are located along the south and west segments of
the District. The primary natural feature that affects service provision is
the Delta itself, and the island character of the various Districts.
Projected growth in the There is no significant growth projected in RD 2025, or any of the other
District/Recommended Districts in the proposed Delta Wetlands Project area.
SOI
Present and probable There is a significant need for levee maintenance services now and in the
need for public facilities future. Levee protection is critical to the health of these islands and the
and services in the area protection of the Delta ecosystem.
Opportunity for infill The proposed SOI update would not encourage growth.
development rather than
SOI expansion
Service capacity and The MSR identified financing as the major constraint to levee maintenance
adequacy and rehabilitation efforts. Various levee deficiencies were identified during
the site visit; however, all District levees meet the minimum levee standard
for the Delta.
Social or economic Communities of interest include Delta Wetlands Properties, the primary
communities of interest landowner on each of the four affected islands, and other private farming
operations on Holland Tract.
Effects on other Retaining the existing SOI would have no effects on other agencies.
agencies Consolidation would affect RDs 2026, 759 and 2028.
Potential for Consolidation of RD 2025 with RD 2026 in Contra Costa County, and
consolidations or other RDs 759 and 2028 in San Joaquin County was identified as an option.
reorganizations when Delta Wetlands Properties is the majority landowner on all four islands,
boundaries divide and all four are part of the proposed Delta Wetlands Project.
communities
Willingness to serve RD 2025 indicated a willingness to continue to serve its boundary area,
and reported that it was not interested in consolidation.
Potential effects on The recommended SOI update would have no direct impact on
agricultural and open agricultural and open space lands. The eventual flooding of Webb Tract
space lands and Bacon Island in accordance with the Delta Wetlands Project would
decrease the amount of agricultural lands, but mitigation efforts on
Holland Tract and Bouldin Island would be undertaken to offset this by
increasing the amount of wetlands and wildlife habitat in the Delta.
Potential environmental Although no potential environmental impacts were identified in the MSR,
impacts the LAFCO counsel and planner should make CEQA determinations.
124 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2026 (WEBB TRACT)
10. R E C L A M AT I O N D I S T R I C T 2 0 2 6
( W E B B T R AC T )
Reclamation District 2026 (Webb Tract) provides maintenance services to non-project levees,
internal drainage and irrigation facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2026 was formed in 1918 as an independent special district. The
District was formed to provide levee maintenance services. 172
The principal act that governs the District is the Reclamation District Act.173 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,174 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,175 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,176 and 4) retain an agricultural
expert to advise landowners.177 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.178
The District’s boundary is located entirely within Contra Costa County. RD 2026 is a Delta
island located in the northeastern corner of Contra Costa County, adjacent to Sacramento County
(to the north) and San Joaquin County (to the east), as shown in Map 10-1. The boundaries
encompass approximately 5,500 acres, or approximately 8.6 square miles. Contra Costa is the
principal county and Contra Costa LAFCO has jurisdiction. The District is located within the
Primary Zone of the Sacramento-San Joaquin Delta, and is outside of the countywide urban limit
line (ULL).
172 The year of formation was reported by the District. LAFCO and State Board of Equalization records do not date back to District
formation.
173 California Water Code, Division 15, §50000-53903.
174 California Water Code §50932.
175 California Water Code §50910.
176 California Water Code §50933.
177 California Water Code §50952.
178 Government Code §56824.10.
BY BURR CONSULTING 125
Map 10-1 R D 2026 Boundary and Coterminous SOI
Reclamation District
Levees
City Boundaries
Ú[
Pumping Stations
n|
Ferry Slips
County Boundary
San
Joaquin
River
t
u
Bradford Island
C Webb Tract
Ú[
s
n
a
m
r
e
h
s
i
F
Ú[
False River
n|
O
Franks Tra ct l
d
D r R
d
R d Harb or i v e
r
n
a
BB
C
ee
a
tt
n
hh
a
e
l
e
R
ll
d
IIssllaanndd h
e l
I
s l N
W
illo
w
e t R d
B
Quimby Island
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.25 0.5 1 Miles
County of Contra Costa disclaimer of liability for geographic information.
RECLAMATION DISTRICT 2026 (WEBB TRACT)
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries. 179
Boundary History
LAFCO and State Board of Equalization (BOE) records indicate that there have been no
boundary changes for RD 2026 since 1959.180
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a three-member board. For contested elections, board members are
elected by landowners to staggered four-year terms, with each voter entitled to cast one vote per
acre owned within the district. The single landowner within RD 2026 is Delta Wetlands Properties,
a private, for profit entity. Board members are not compensated by RD 2026.
The District reported that there have been no recent contested elections. Uncontested vacancies
on the governing body are filled by appointment by the Board of Supervisors. The District meets
on an as-needed basis, with approximately four meetings held per year.
Table 10-1: RD 2026 Governing Body
Reclamation District 2026 (Webb Tract)
Governing Body
Name Position Began Serving Term Expires
David A. Forkel Chair 2005 2009
Members
Kris Kaiser Trustee 2007 2011
John L. Winther Trustee 2007 2011
Manner of Selection Landowner elections
Length of Term Four years
Date: As needed Location: 311 East Main St.,
Meetings
Stockton, CA 95202
Agenda Distribution Posted at District office
Minutes Distribution By request
Contact
Contact General Manager
Mailing Address 1660 Olympic Boulevard Suite 350, Walnut Creek, CA 94596-5111
Email/Website info@deltawetlands.com
The District’s constituent outreach activities consist of posting agendas and notices at the
District office. Because RD 2026 is a single-landowner District, constituent outreach efforts are
limited and complaints are rare. The District reported that no complaints were received in FY 07-
08. Complaints would typically be raised and addressed at board meetings.
179 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
180 The BOE record for RD 2026 begins in 1959 and shows no boundary changes since then. Contra Costa LAFCO records begin in
1965 and show no boundary changes to RD 2026.
BY BURR CONSULTING 127
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
LAFCO map inquiries and document requests.
SERVICE DEMAND AND GROWTH
The District bounds encompass agricultural land uses, and local business activities within the
District are limited to farming operations. Crops grown on the island include primarily corn and
wheat. The majority of the island consists of prime farmland (approximately 4,060 acres), but also
includes farmland of statewide importance (approximately 430 acres), unique farmland
(approximately 270 acres), and farmland of local importance (approximately 650 acres).181 There are
nearly 134 acres of farmland under Williamson Act contract within the District, consisting of over
two percent of all agricultural land. The Williamson Act contract within the District is in non-
renewal, and is set to expire in November 2012.
The District considers its customer base to be Delta Wetlands, the single landowner within the
District.
The District reported that there is no residential population on the island; however, 2000 Census
data reported a population of two. The District’s population density was 0.2 per square mile,
compared with a countywide density of 1,318.182 The island is outside of the countywide urban limit
line (ULL), and the District does not anticipate changes in service demand in the future. The
District has not experienced recent growth and does not anticipate significant growth in the future.
Webb Tract is not accessible by road; however, access to the District is provided by ferry from
Jersey Island.
Delta Wetlands Properties is the primary landowner on Webb Tract and Holland Tract in
Contra Costa County, and Bouldin Island and Bacon Island in San Joaquin County. Delta Wetlands’
long-term goal is to construct weirs with gates in the Webb Tract and Bacon Island levees, to briefly
divert high flows onto the islands during high tide events, in order to decrease peak tidal elevations
in the central Delta and avoid levee overtopping.183 District studies modeling Delta high tidal flows
project that diverting 100,000 acre-feet of water onto each island during peak tidal elevations could
lower the peak tidal elevation in the central Delta by three to four inches. 184 Water captured during
surplus conditions would be returned to the Delta later in the year and sold for beneficial use (e.g.,
summer export for municipal and industrial use, irrigation, Delta outflow, etc.).185 Holland Tract and
Bouldin Islands would be maintained as wetland and wildlife habitat to mitigate habitat loss from the
flooding of Webb Tract and Bacon Island.
181 California Department of Conservation Division of Land Resource Protection, Contra Costa County Important Farmland 2006,
Farmland Mapping and Monitoring Program, 2007.
182 According to 2000 Census data.
183 ICF Jones & Stokes, Delta Wetlands Potential Flood Protection Operations, July 2008, p. 1.
184 Ibid., p. 17.
185 Interview with David Forkel, RD 2026 General Manager, April 21, 2009.
128 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2026 (WEBB TRACT)
The District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies.
MANAGEMENT
The District employs no full-time staff positions. The District contracts out for all major
services, including levee rehabilitation projects, engineering services and legal counsel. Routine levee
maintenance activities are performed by on-site farmers or the landowner and reimbursed by the
District.186
The District conducts evaluations of contractor performance as work is completed. Efficiencies
are gained by the District having an engineer who works for various Delta RDs, because it allows for
easy benchmarking and cost comparisons.
Levee inspections are performed on a daily basis by on-site farmers, and several times per day
during storm events and high tides. The District reimburses farmers for time spent on levee patrols.
If levee maintenance issues are discovered during routine levee patrols, the District engineer is
immediately notified. The District does not keep a comprehensive log of inspection reports, but the
engineer documents maintenance issues as they arise. Oversight and review of levee maintenance
activities is supplemented by Department of Water Resources (DWR) inspections of work
performed under the subventions and special projects programs.187
The District reported that it adopts an annual budget, and annually prepares audited financial
statements. The most recent audited financial statement provided to LAFCO by the District was for
FY 07-08. District planning efforts include annual applications to DWR for subventions and special
projects funding, and year-end summaries of work performed. The District had not prepared a
multi-year capital improvement plan as of the drafting of this report; however, the District reported
that it plans to complete a five-year plan by December 2009.
FINANCING
The District has demonstrated the financial ability to provide minimally adequate service.
Capital improvements on the levee system occur primarily through DWR special projects funds,
whereas routine levee maintenance is funded by assessments and DWR subventions.
District expenditures fluctuate year to year as financing relies on DWR special projects funding
for significant levee maintenance and rehabilitation activities. Expenditures were higher in FY 04-05
than in subsequent years due to DWR special projects funding for levee rehabilitation. To a lesser
extent, levee maintenance needs and efforts also fluctuate somewhat from year to year. Somewhat
less maintenance occurred in FY 07-08 than in prior years, resulting in somewhat lower expenditures
than in previous years. Revenue fluctuations have generally followed the expenditure trend, with
186 In FY 07-08, RD 2026 reimbursed Bouldin Farming Company (an on-site tenant at the time) $97,500 for levee maintenance
services.
187 DWR performs inspections of work funded through the special projects and subventions programs, but does not conduct overall
levee inspections or certification
BY BURR CONSULTING 129
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
higher intergovernmental revenues in FY 04-05 than subsequent years due to a greater volume of
reimbursable capital projects that year.
Figure 10-1: RD 2026 Expenditures, FY 04-05 through FY 07-08
The District received $835,000 in $2,500,000
revenues in FY 07-08. RD 2026 relies
on both assessments and $2,000,000
intergovernmental revenues to fund
services. Assessments generated 49 $1,500,000
percent of operating revenues in FY 07-
08, DWR special projects funds $1,000,000
generated 34 percent and DWR
subventions generated 16 percent. The $500,000
District levied assessments of
approximately $75 per acre in FY 07- $0
08.188 The District has not adopted FY 04-05 FY 05-06 FY 06-07 FY 07-08
development requirements, and does
not have development impact fees, because no development has taken place on the island.
Total expenditures for FY 07-08 were approximately $617,500, 17 percent of which were for
routine levee maintenance activities and 47 percent for expenditures related to capital
improvements. Capital improvement expenditures in FY 07-08 were limited to engineering activities
for special projects. An additional 14 percent of expenditures were for pumping station and canal
maintenance and operations. Approximately 18 percent of expenditures in FY 07-08 were paid to
the Delta Ferry Authority, a joint powers authority (JPA) between RD 2026 and RD 2059 (Bradford
Island), for operation of the ferry.189 The District spent approximately $8,350 on maintenance costs
per levee mile in FY 07-08, compared to a countywide median level of $9,900 per levee mile.
The District had no long-term or short-term debt at the end of FY 07-08. Short-term debt often
consists of short-term warrants registered with the Bank of Stockton, used to pay annual
maintenance costs. Short-term warrants mature within one year, and are repaid when DWR issues
subvention reimbursements for the prior fiscal year, typically within six to eight months of the close
of the fiscal year.
The District does not have a formal policy on maintaining financial reserves, and reported that it
typically exhausts all funds and does not maintain a reserve. The District had $312,722 in
unrestricted net assets at the close of FY 07-08. In other words, RD 2026 maintained six months of
working reserves.
188 The District reported that assessments are not indexed with inflation, and all parcels are assessed at a constant rate.
189 CSA M-1 was formed in 1960 by the Contra Costa County Board of Supervisors to “provide and furnish ferry boat services and
facilities therein” to Bradford Island and Webb Tract. In 1987, the County turned over operation of the ferry to RD 2026 and RD
2059, and a JPA was formed between the two Districts to “attempt to operate the ferry for limited public transportation between the
islands…subject to their limited financial ability.” Under the terms of the JPA, each district must approve the annual budget for the
Delta Ferry Authority and make “contributions to the Authority as from time to time agreed upon by the parties.” The County’s
contribution to the Delta Ferry Authority from CSA M-1 is approximately $30,000 per year, limited to the current property tax share.
130 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2026 (WEBB TRACT)
Table 10-2: RD 2026 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
In FY 07-08, reclamation services were financed by intergovernmental revenues (51%) and assessments (49%).
Development Fees and Requirements
Agricultural (per acre) NA
Residential (per unit) Single Family: NA Multi-Family: NA
Non-residential (per 1,000 sq. ft.)Commercial: NA Industrial: NA
Development Requirements: NA
RD 2026 Audited Financial Statements
Revenues FY 06-07 FY 07-081 Expenditures FY 06-07 FY 07-081
Total $905,011 $835,001 Total $904,404 $617,503
Property Tax $0 $0 Operations $439,895 $196,702
Assessments $406,070 $411,042 Drainage & Utilities2 $26,620 $88,702
Intergovernmental Revenues $498,693 $423,959 Levee Maintenance3 $413,275 $108,000
Levee Maintenance NP $135,959 Capital Improvements4 $348,337 $288,000
Capital Improvements NP $288,000
Administrative5
$10,097 $9,902
Development Impact Fees $0 $0 Professional Fees6 $8,000 $2,000
Interest $0 $0 Insurance $9,175 $10,212
Other Revenues $248 $0
Miscellaneous7
$88,900 $110,687
Note:
(1) Reported as FY 07-08 Actuals in District's FY 08-09 Final Budget.
(2) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(3) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(4) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(5) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(6) Legal and accounting services.
(7) In FY 06-07, miscellaneous expenditures included contributions to the Delta Ferry Authority of $88,900. In FY 07-08,
miscellaneous expenditures included $108,337 in contributions to the Delta Ferry Authority.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2026 provides maintenance services to non-project levees, internal drainage and irrigation
facilities. Routine levee maintenance activities such as vegetation removal, seepage/irrigation ditch
cleaning, rodent control, roadway maintenance, and repair of waterside erosion are provided directly
by on-site farmers or the landowner. The District is also responsible for flood fighting and levee
patrol during high water events. Major levee rehabilitation and capital improvement activities are
performed by contract. Ferry service to the island is provided by contract with the Delta Ferry
Authority, a joint powers authority between RD 2026 and RD 2059 (Bradford Island).
BY BURR CONSULTING 131
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
LOCATION
RD 2026 provides services within its boundary area, the entirety of Webb Tract. The District
does not provide any services outside of Webb Tract.
The tract has been determined to be critical to the health of the Delta. Webb Tract is one of the
eight western Delta islands that DWR has identified as critical to control of salinity in the Delta,
protecting water quality to all water users in the state. The District provides statewide benefits
outside its bounds.190
INFRASTRUCTURE
Key infrastructure in the District includes nearly 13 miles of earthen levees, as well as eight miles
of irrigation canals and two pumping stations. The District reported that all levees meet the Hazard
Mitigation Plan (HMP) standard of one foot above the 100-year floodplain. 191 The District
Engineer reported that all levees are in good condition, only requiring routine maintenance.
Despite the fact that all levees were reported to be in good condition at HMP standard, the
District plans to upgrade all levees beyond HMP for increased levels of flood protection. The
District reported that the HMP standard provides minimal freeboard for overtopping due to high
river flows, high tides and high winds, and the peat foundation on which the levees are built is
constantly subsiding, causing embankment cracking, loss of freeboard and continual maintenance.192
Because levees at the HMP standard are at increased risk for catastrophic levee failure, the District
has a long-term goal of upgrading the levees to DWR Bulletin 192-82 standards to provide a higher
degree of flood protection.193
According to DWR, there have been two inundation occurrences on Webb Tract since 1900.194
The District reported that the most recent levee failure occurred in 1980. The District reported that
significant subsidence has occurred on the island, at a rate of approximately one to two inches per
year. Surface elevations range between 5 and 20 feet below sea level.195 The base flood elevation,
which is the anticipated water level in a 100-year flood occurrence, is seven feet above mean sea
level. In other words, the entire island would be covered by 12-27 feet of water in a 100-year flood
event. Hence, the entire island is presently classified by FEMA as being within the 100-year
floodplain.
The first phase of levee rehabilitation will bring levees to PL 84-99 standards, with subsequent
rehabilitation planned to eventually bring the levees up to DWR Bulletin 192-82 standards. The
190 Water Code §12311.
191 For a detailed explanation of levee standards and specifications, please refer to chapter 4.
192 RD 2026, Letter to U.S. Army Corps of Engineers, January 31, 2006.
193 RD 2026, Delta Levee Subventions Program 2008-2009 Application, June 27, 2008.
194 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 7.
195 Ibid., p. 6.
132 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2026 (WEBB TRACT)
District plans to begin the first phase of rehabilitating the levee to the PL 84-99 cross-section
standards in FY 08-09, consisting of depositing 150,000 cubic yards of fill throughout the island to
achieve PL 84-99 slope specifications. The District has budgeted $1.7 million for levee
rehabilitation in FY 08-09, including $200,000 in engineering costs.196 This amount had been
approved and paid by DWR as of the drafting of this report. The District expects to rehabilitate all
levees to PL 84-99 standards within five years, assuming State funding stays consistent.197
The District has also budgeted $260,000 for routine maintenance activities in FY 08-09. Thirty-
four percent of this amount is for erosion repair or restoration of rock revetment; 29 percent is for
levee inspection and engineering services; 19 percent is for addition of gravel to the levee crown; 10
percent is for spraying, burning and clearing levee slopes and crown of weeds and brush; and four
percent is for cleaning of seepage and irrigation ditches which are adjacent to the landside levee
toe.198 Reimbursement of this amount by DWR is subject to approval of the subventions claim once
it is submitted at the end of the fiscal year.
196 RD 2026, Delta Levee Subventions Program 2008-2009 Application, June 27, 2008.
197 Interview with Gilbert Cosio, RD 2026 Engineer, April 20, 2009.
198 RD 2026, Delta Levee Subventions Program 2008-2009 Application, June 27, 2008.
BY BURR CONSULTING 133
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 10-3: RD 2026 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance By Contract Weed Abatement By Contract
Flood Control By Contract Slope Protection By Contract
Drainage By Contract Vector/Rodent Control By Contract
Upkeep of Levee Access Roads By Contract Levee Patrol By Contract
Ferry Service By Contract Flood Fighting By Contract
District Overview
Total Levee Miles 12.9 Surface Elevation -5 to -20 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 0.0 Dry Land Levee 0.0
HMP Standard 12.9 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 12.9
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes - 8 mi. Pump Station(s) Yes - 2
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A30 Base Flood Elevation 7 ft.
Levee Inspection Practices
Levee inspections are performed on a daily basis by on-site farmers, but no written inspection reports are
created. Levee inspections are performed multiple times per day during severe weather events.
Levee Inspection Reports
Most Recent Written Inspection NA Inspection Rating NA
Levee Segment Description Condition
Fisherman's Cut Western District boundary 1.85 mi. at HMP
False River Southern District boundary 4.19 mi. at HMP
San Joaquin River Northern District boundary 5.83 mi. at HMP
Old River Eastern District boundary 1.06 mi. at HMP
Levee Maintenance
Miles Rehabilitated, FY 07-08 0.0 Miles Needing Rehabilitation1 12.9
% Rehabilitated, FY 07-08 0% % Needing Rehabilitation 100%
Rehabilitation Cost per Levee Mile2 NA Maintenance Cost per Levee Mile3 $8,353
Infrastructure Needs/Deficiencies
Rehabilitation of the entire levee system is needed to meet PL 84-99 standards. The District plans to begin the
first phase of rehabilitating the levee to the PL 84-99 cross-section standard in FY 08-09.
Note:
(1) To achieve the District's short-term goal of PL 84-99 standards.
(2) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number of
miles rehabilitated in FY 07-08.
(3) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
134 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2026 (WEBB TRACT)
GOVERNANCE ALTERNATIVES
The MSR identified consolidation of RD 2025 (Holland Tract) and RD 2026 in Contra Costa
County and RD 756 (Bouldin Island) and RD 2028 (Bacon Island) in San Joaquin County as a
possibility. Delta Wetlands Properties is the single landowner on RD 2026 (Webb Tract), RD 756
(Bouldin Island) and RD 2028 (Bacon Island), and is the majority landowner in RD 2025 (Holland
Tract). Delta Wetlands’ long-term goal is to flood Webb Tract and Bacon Island as part of a surface
water storage project, and maintain Holland Tract and Bouldin Islands as wetland and wildlife
habitat to mitigate habitat loss from the flooding of the other two islands. The District reported that
levee maintenance activities will continue to be needed on the levee systems of these islands even
after the water storage facilities and habitat mitigation sites have been established. Consolidation of
these four RDs would allow for levee maintenance services on all islands in the Delta Wetlands
project to be provided by a single entity, which would increase accountability and efficiency.
In the event of consolidation of all four Districts, Contra Costa LAFCO would be considered
principal LAFCO due to there being a greater amount of assessed value in Contra Costa County.
Assessed value in FY 07-08 in Contra Costa County was $27.6 million compared to $23.2 million in
San Joaquin County, according to the respective counties. Should consolidation efforts proceed, it is
recommended that RD 2025 (Holland Tract) serve as the successor agency, because it is the only
island where Delta Wetlands Properties is not the sole property owner, and it would be a more
natural transition for the other property owners on Holland Tract.
The District reported that, in principle, it is not interested in consolidation because each district
faces its own set of independent flood risks and facility needs. From a risk management perspective,
consolidation is difficult because one district (or landowner) does not want to take responsibility for
the levees of another. In addition, the District reported that it does not view the legal and
administrative costs and efforts associated with consolidation as likely to outweigh any increased
efficiencies from consolidation. The District reported that all four RDs are already served by the
same General Manager, engineer and legal counsel, and it does not anticipate that many new
efficiencies would be gained by consolidation.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The residential population within the district was two according to the 2000 Census. The
District reported that there is presently no residential population on the island. There has
been no recent growth within the District, and no growth is anticipated in the future as the
District is entirely agricultural, and outside of the countywide urban limit line (ULL).
2) The landowner’s long-term goal for the island is for it to serve as a surface water storage
facility.
BY BURR CONSULTING 135
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
3) Webb Tract is one of the eight western Delta islands that DWR has identified as critical to
control of salinity in the Delta, protecting water quality to all water users in the State.
4) All levees within the District currently meet HMP standards but do not provide 100-year
flood protection. The District reports that the capacity of the levees at HMP standards is
inadequate, and the levees must be rehabilitated to meet PL 84-99 standards at a minimum,
and Bulletin 192-82 standards in the long-run.
5) The District plans to begin the first phase of rehabilitating the levees to PL 84-99 standards
in FY 08-09. The District expects to rehabilitate all levees to PL 84-99 standards within five
years, assuming State funding stays consistent. A long-term goal of the District is to upgrade
all levees to Bulletin 192-82 standards, but this is dependent upon available funding from
DWR.
6) All levee maintenance and rehabilitation projects are performed by contract. The District
has no staff positions, but reimburses on-site farmers for routine maintenance work.
7) The District spent approximately $8,350 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
8) The District reported that the most significant service challenge is obtaining funding for
needed maintenance and rehabilitation activities, and adequate levee maintenance would not
be possible without DWR funding.
9) The District did not have an updated capital improvement plan in place as of the drafting of
this report; however, the District indicated that it will have one in place by December 2009.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
10) The District has demonstrated the financial ability to provide minimally adequate service;
however, it plans to provide increased service levels beginning in FY 08-09, subject to
financial assistance from DWR.
11) The District reported that the current level of financing is generally not sufficient for
adequate service provision, and major maintenance and rehabilitation activities are only
possible with DWR funding.
12) Funds are insufficient for the agency to provide full-time staffing.
13) The District should consider adopting an assessment that increases with inflation.
14) The District has not adopted development requirements, and does not receive development
impact fees, because no development has taken place on the island.
136 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2026 (WEBB TRACT)
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
15) RD 2026 shares administrative facilities with RD 2025 (Holland Tract) in Contra Costa
County, and RD 756 (Bouldin Island) and RD 2028 (Bacon Island) in San Joaquin County.
Efficiencies are gained by having the same General Manager serve each RD.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
16) Accountability is achieved by the District having a close working relationship with Delta
Wetlands, the single landowner within the District. The General Manager of the District is
also the Delta Wetlands Project Manager.
17) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds.
AGENCY PROPOSAL
The agency reported a desire to retain its existing coterminous SOI.
SOI OPTIONS
Given the considerations addressed in the MSR, two options are identified for the RD 2026
SOI:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
SOI Option #2 – Zero SOI to signal consolidation with RD 2025, RD 756 and RD 2028
Adopting a zero SOI to signal consolidation with RD 2025 (Holland Tract) in Contra Costa
County, and RD 756 (Bouldin Island) and RD 2028 (Bacon Island) in San Joaquin County is a
possibility. All four islands are part of the proposed Delta Wetlands Project, which would eventually
convert Webb Tract and Bacon Island to surface water storage facilities, and maintain Holland Tract
and Bouldin Islands as wetland and wildlife habitat to mitigate habitat loss from the flooding of the
other two islands. Delta Wetlands is the majority property owner of each of the islands, and the
Delta Wetlands Project Manager serves as the General Manager for each of the four RDs, so
consolidation would seem to be a natural fit.
BY BURR CONSULTING 137
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
RECOMMENDATION
Retaining the existing coterminous SOI is recommended for RD 2026. Although consolidation
of all four districts in the proposed Delta Wetlands Project would allow for future levee maintenance
services to be provided by a single entity, consolidation itself would bring few efficiencies to the
Districts, and would create significant problems from a risk management standpoint.
Table 10-4: RD 2026 SOI Analysis
Issue Comments
SOI update Retain existing coterminous SOI.
recommendation
Services provided RD 2026 provides maintenance services to non-project levees, internal
drainage and irrigation facilities. Comparable services are provided by RDs
2025, RD 759 and RD 2028.
Present and planned Present land uses within all four RDs are agricultural in nature. The Delta
land uses in the area Wetlands Project calls for RDs 2026 and 2028 to be flooded, to serve as
surface water storage facilities, and RDs 2025 and 759 to be managed as
wetland and wildlife habitat. Under this scenario, land uses in RDs 2025
and 759 would include seasonal managed wetlands, emergent marsh,
seasonal ponds and lakes, crops (hay, grains, corn, and wheat), mixed
agriculture/seasonal wetlands, riparian, and grasslands. Private agricultural
and commercial operations would persist in the southwest portion of RD
2025 (Holland Tract).
Location of facilities, Levees protected by the Districts are located around the perimeter of the
infrastructure and islands. Internal drainage facilities run north-south and east-west through
natural features the Districts. The RD 2026 pump stations are located along the south and
west segments of the District and the RD 2025 pump station is located
near the mid-way point of the northern segment of the District. The
primary natural feature that affects service provision is the Delta itself, and
the island character of the various Districts.
Projected growth in the There is no significant growth projected in RD 2026, or any of the other
District/Recommended Districts in the proposed Delta Wetlands Project area.
SOI
Present and probable There is a significant need for levee maintenance services now and in the
need for public facilities future. Levee protection is critical to the health of these islands and the
and services in the area protection of the Delta ecosystem.
Opportunity for infill The proposed SOI update would not encourage growth.
development rather than
SOI expansion
Service capacity and The MSR identified financing as the major constraint to levee maintenance
adequacy and rehabilitation efforts; however, all District levees meet the minimum
levee standard for the Delta.
138 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2026 (WEBB TRACT)
Social or economic Communities of interest include Delta Wetlands Properties, the primary
communities of interest landowner on each of the four affected islands, and other private farming
operations on Holland Tract (RD 2025).
Effects on other Retaining the existing SOI would have no effects on other agencies.
agencies Consolidation would affect RDs 2025, 759 and 2028.
Potential for Consolidation of RD 2026 with RD 2025 in Contra Costa County, and
consolidations or other RDs 759 and 2028 in San Joaquin County was identified as an option.
reorganizations when Delta Wetlands Properties is the majority landowner on all four islands,
boundaries divide and all four are part of the proposed Delta Wetlands Project.
communities
Willingness to serve RD 2026 indicated a willingness to continue to serve its boundary area,
and reported that it was not interested in consolidation.
Potential effects on The recommended SOI update would have no direct impact on
agricultural and open agricultural and open space lands. The eventual flooding of Webb Tract
space lands and Bacon Island in accordance with the Delta Wetlands Project would
decrease the amount of agricultural lands, but mitigation efforts on
Holland Tract and Bouldin Island would be undertaken to offset this by
increasing the amount of wetlands and wildlife habitat in the Delta.
Potential environmental Although no potential environmental impacts were identified in the MSR,
impacts the LAFCO counsel and planner should make CEQA determinations.
BY BURR CONSULTING 139
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
11. R E C L A M AT I O N D I S T R I C T 2 0 5 9
( B R A D F O R D I S L A N D )
Reclamation District 2059 (Bradford Island) provides maintenance services to non-project levees
and internal drainage facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2059 was formed on November 21, 1921 as an independent special
district. The District was formed to provide levee and drainage maintenance services. 199
The principal act that governs the District is the Reclamation District Act.200 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,201 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,202 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,203 and 4) retain an agricultural
expert to advise landowners.204 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.205
The District’s boundary is located entirely within Contra Costa County. RD 2059 is a Delta
island located in the northeastern corner of Contra Costa County, adjacent to Sacramento County
(in the north and west), as shown on Map 11-1. The boundaries encompass nearly 2,200 acres, or
approximately 3.4 square miles. Contra Costa is the principal county and Contra Costa LAFCO has
jurisdiction. The District is within the Primary Zone of the Sacramento-San Joaquin Delta, and is
outside of the countywide urban limit line (ULL).
199 The year of formation was reported by the District. LAFCO records do not date back to District formation, and RD 2059 does
not file with the State Board of Equalization.
200 California Water Code, Division 15, §50000-53903.
201 California Water Code §50932.
202 California Water Code §50910.
203 California Water Code §50933.
204 California Water Code §50952.
205 Government Code §56824.10.
140 PREPARED FOR CONTRA COSTA LAFCO
Map 11-1 R D 2059 Boundary and Coterminous SOI
San
Joaquin
River
t
u
Ú[ C
Bradford Island
s
n
a
m
r
e
h
s
i
F Webb Tract
n|
False River
Reclamation District
Levees
Jersey Island
City Boundaries
Ú[
n|
Pumping Stations
r s
ey Island
Rd
e
Ferry Slips J
County Boundary BBeetthheell IIssllaanndd
W Willow
R
d
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B t o C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u y l a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.125 0.25 0.5 Miles
County of Contra Costa disclaimer of liability for geographic information.
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries. 206
Boundary History
LAFCO records indicate that there have been no boundary changes for RD 2059 since 1965.207
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a five-member board. For contested elections, board members are
elected by landowners (via all-mail ballot) to staggered four-year terms, with each voter entitled to
cast one vote per dollar’s worth of real estate owned within the District.208 The District reported
that there have been no recent contested elections. Uncontested vacancies on the governing body
are filled by appointment by the Board of Supervisors. Vacant board seat were filled by Board of
Supervisors appointment in 2006 and 2008. RD 2059 board members serve on a volunteer basis
and do not receive compensation.
Table 11-1: RD 2059 Governing Body
Reclamation District 2059 (Bradford Island)
Governing Body
Name Position Began Serving Term Expires
Holly Davis Trustee 2008 2011
Robert Davies Trustee 2008 2009
Members
Michael Hamman Trustee 2001 2011
Eugene Lewis Trustee 2000 2011
J. Paul Sosnowski Chair 2006 2009
Landowner elections. Board member must be a landowner or legal
Manner of Selection
representative of a landowner within the District.
Length of Term Four years
Date: First Tuesday of Mar., Location: 6080 Bethel Island Road
Meetings
Jun., Sept. and Dec. Bethel Island, CA 94511
Agenda Distribution Online and at District office
Minutes Distribution Online and at District office
Contact
Contact District Manager
Mailing Address PO Box 346, Bethel Island, CA 94511
Email/Website http://www.bradfordisland.com
The District’s constituent outreach activities consist of posting notices at public locations such
as the District office and at the ferry, and mailing and emailing notices to landowners. The District
206 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
207 Contra Costa LAFCO records begin in 1965 and show no boundary changes to RD 2059.
208 RD 2059, Amended and Restated Bylaws of Bradford Reclamation District No. 2059, amended and accepted February 17, 2009.
142 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2059 (BRADFORD ISLAND)
maintains a website which has links to meeting agendas and minutes, important documents, forms
and permits, board member information, and contact information.
With regard to customer service, complaints may be filed with the District Manager by mail or
email. The District reported that no complaints were received in FY 07-08.
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
LAFCO map inquiries and interview requests.
SERVICE DEMAND AND GROWTH
The District bounds encompass agricultural, commercial, residential, recreational, and gas
extraction land uses. Local business activity consists primarily of cattle grazing and small
commercial operations. The majority of Bradford Island consists of farmland of local importance
(approximately 1,610 acres), but also includes prime farmland along the southern portion of the
island (approximately 320 acres), and farmland of statewide importance (approximately 80 acres).209
There are 481 acres under Williamson Act contract within the District, amounting to approximately
24 percent of all agricultural land.
Bradford Island is not accessible by road; however, access to the District is provided by ferry
from Jersey Island.
The District considers its customer base to be the 71 landowners on the island. There were 48
residents in the District, according to 2000 Census data. The District’s population density was 14
per square mile, compared with a countywide density of 1,318. The area has not experienced
significant recent growth, and does not anticipate changes in service demand in the future. There
are no planned or proposed development projects on Bradford Island.
The District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies.
MANAGEMENT
The District does not have any full-time staff. The District Manager and Levee Superintendent
are independent contractors that work part-time. Both the Manager and Levee Superintendent
report directly to the RD 2059 Board every three months. The District formally evaluates the
performance of contractors during their renewal period, and tracks workload throughout the year at
Board meetings.
The District does not have a formal levee inspection procedure, but reported that it does keep
inspection logs. The District reported that informal levee inspections are performed by the Levee
Superintendent on a weekly basis, and a superintendent’s report is prepared for every board meeting.
The District engineer performs approximately three to four levee inspections per year, and the
209 California Department of Conservation Division of Land Resource Protection, Contra Costa County Important Farmland 2006,
Farmland Mapping and Monitoring Program, 2007.
BY BURR CONSULTING 143
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
District is notified if any significant levee issues are identified. The most recent written levee
inspection provided by the District was from April 2009.
The District reported that it adopts an annual budget, and annually prepares audited financial
statements. The most recent audited financial statement provided to LAFCO by the District was for
FY 06-07.
The District had not prepared a multi-year capital improvement plan as of the drafting of this
report; however, the District reported that it plans to complete a five-year plan by FY 09-10. Other
planning efforts include applications to the Department of Water Resources (DWR) for special
projects and subventions funding, and year-end summaries of work performed.
FINANCING
The District has demonstrated the financial ability to provide minimally adequate service to
portions of the District. The District reported that its financial ability to provide service is severely
limited, and that the District does not have enough funds to sufficiently maintain the island or its
pump station at this time. Various infrastructure needs have been deferred due to a lack of available
funds, and the District reported that it has not qualified for DWR subventions reimbursements due
to insufficient maintenance expenditures per levee mile. The District has received DWR special
projects funding for levee rehabilitation in recent years, but has otherwise performed only minimal
maintenance.210 A large portion of District revenues are used to fund operation of the ferry to
Bradford Island, and the District reported that the revenues generated from assessments are not
enough to maintain the ferry service and maintain the levees on a regular basis.
Figure 11-1: RD 2059 Expenditures, FY 04-05 through FY 07-08
District expenditures fluctuate year to $3,000,000
year as financing relies on DWR special
$2,500,000
projects funding for significant levee
rehabilitation activities. Expenditures were
$2,000,000
higher in FY 06-07 than usual due to a
nearly $2.5 million levee rehabilitation and $1,500,000
habitat mitigation project. To a lesser
$1,000,000
extent levee maintenance needs and efforts
also fluctuate somewhat from year to year;
$500,000
however, the District reported having
performed very little maintenance to levees $0
in recent years due to a lack of funds. FY 04-05 FY 05-06 FY 06-07 FY 07-08
Maintenance expenditures in recent years
have consisted of work performed by the Levee Superintendent (approximately $1,300 per year),
plus general engineering expenditures of nearly $15,500 in FY 07-08. Revenue fluctuations have
generally followed the expenditure trend.
210 RD 2059 receives 100 percent funding from DWR for special projects (no cost share) due to its importance in the Delta under
Water Code §12311, and the District’s inability to pay for levee rehabilitation on its own (per its 1990s Ability-to-Pay study submitted
to DWR).
144 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2059 (BRADFORD ISLAND)
The District received approximately $249,000 in revenues in FY 07-08. RD 2059 relies on
assessments, intergovernmental revenues and ferry toll revenue to fund services. Assessments
generated 64 percent of operating revenues in FY 07-08, intergovernmental revenues (DWR special
projects funds) generated 26 percent and ferry toll revenue generated nine percent.211
Total expenditures for FY 07-08 were over $481,000, three percent of which were for levee
maintenance and three percent for pumping station operations. Capital improvements in FY 07-08
consisted of 53 percent of overall expenditures. Other expenditures in FY 07-08 included
professional fees (seven percent) and administrative costs (three percent). The District spent
approximately $2,200 on maintenance costs per levee mile in FY 07-08, compared to a countywide
median level of $9,900 per levee mile. Expenditures in excess of revenues in FY 06-07 and FY 07-
08 were funded by the District’s restricted net assets carried over from the prior fiscal year.
Approximately 28 percent of expenditures in FY 07-08 consisted of contributions to the Delta
Ferry Authority, a joint powers authority (JPA) between RD 2059 and RD 2026 (Webb Tract), for
operation of the ferry to the island.212
The District had no long-term debt at the end of FY 07-08. The District does not have a formal
policy on maintaining financial reserves, but had $99,603 in unrestricted net assets at the close of FY
06-07. In other words, the District maintained just over five months of working capital.213
211 The District’s FY 07-08 assessment rate was not provided as of the drafting of this report; however, the District’s FY 08-09
assessment rate ranges from $36.50 to $730 per acre, depending on the land use of the area. The District was in the process of
updating its assessment as of the drafting of this report. The District engineer completed an assessment report and accompanying 20-
year budget worksheet in December 2008; however, the District had yet to conduct the required Proposition 218 election.
212 CSA M-1 was formed in 1960 by the Contra Costa County Board of Supervisors to “provide and furnish ferry boat services and
facilities therein” to Bradford Island and Webb Tract. In 1987, the County turned over operation of the ferry to RD 2026 and RD
2059, and a JPA was formed between the two Districts to “attempt to operate the ferry for limited public transportation between the
islands…subject to their limited financial ability.” Under the terms of the JPA, each district must approve the annual budget for the
Delta Ferry Authority and make “contributions to the Authority as from time to time agreed upon by the parties.” The County’s
contribution to the Delta Ferry Authority from CSA M-1 is approximately $30,000 per year, limited to the current property tax share.
213 Excluding expenses for DWR special projects.
BY BURR CONSULTING 145
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 11-2: RD 2059 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
In FY 07-08, reclamation services were financed primarily by assessments (64%), intergovernmental revenues
(26%) and other sources (9%).
Development Fees and Requirements
Agricultural (per acre) NA
Residential (per unit) Single Family: NA Multi-Family: NA
Non-residential (per 1,000 sq. ft.)Commercial: NA Industrial: NA
Development Requirements: NA
RD 2059 Audited Financial Statements
Revenues FY 06-07 FY 07-081 Expenditures FY 06-07 FY 07-081
Total $2,337,375 $249,130 Total $2,835,855 $481,432
Property Tax $0 $0 Operations $11,644 $31,084
Assessments $212,942 $158,791 Drainage & Utilities3 $10,444 $14,256
Intergovernmental Revenues $1,363,389 $65,950 Levee Maintenance4 $1,200 $16,829
Levee Maintenance $0 $0 Capital Improvements5 $1,941,265 $256,867
Capital Improvements $1,363,389 $65,950
Administrative6
$0 $16,169
Development Impact Fees $0 $0 Professional Fees7 $42,408 $35,833
Interest $2,932 $843 Insurance $5,626 $6,168
Other Revenues2 $758,112 $23,546 Miscellaneous8 $834,912 $135,311
Note:
(1) FY 07-08 financials are unaudited.
(2) Other revenues consist of approximately $736,500 in DWR special projects funds for habitat mitigation, and
approximately $21,600 in ferry tolls, and revenue from fees and permits.
(3) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(4) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(5) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(6) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(7) Legal and accounting services.
(8) In FY 06-07, miscellaneous expenditures included contributions to the Delta Ferry Authority of $94,075 and
approximately $736,500 in habitat mitigation for levee rehabilitation work. In FY 07-08, miscellaneous expenditures
included $134,811 in contributions to the Delta Ferry Authority.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2059 provides levee maintenance and internal drainage services. The District conducts
vegetation removal, weed abatement and rodent control, and upkeep of access roads as part of its
levee maintenance work. The District is also responsible for flood fighting and levee patrol during
high water events. Ferry service to the island is provided by contract with the Delta Ferry Authority,
a joint powers authority between RD 2059 and RD 2026 (Webb Tract).
146 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2059 (BRADFORD ISLAND)
LOCATION
RD 2059 provides services within its boundary area, the entirety of Bradford Island. The
District does not provide any services outside of Bradford Island.
The island has been determined to be critical to the health of the Delta. Bradford Island is one
of the eight western Delta islands that DWR has identified as critical to control of salinity in the
Delta, protecting water quality to all water users in the state. The District provides statewide
benefits outside its bounds.214
INFRASTRUCTURE
Key infrastructure in the District includes over seven miles of earthen levees, as well as over
seven miles of internal drainage ditches and one pumping station. The District reported that four
miles of levees meet the Hazard Mitigation Plan (HMP) standard, and the remaining three and a half
miles of levees do not.215 Levees not meeting HMP standard are primarily located along the north
and east sides of the District.
According to DWR, there have been two inundation occurrences on Bradford Island since
1900.216 The District reported that the most recent levee failure occurred in 1983. The surface of
Bradford Island is entirely below sea level, with surface elevations ranging from five feet below sea
level in the southern portion of the District to between 10 and 15 feet below sea level in the
northern portion of the District.217 The base flood elevation, which is the anticipated water level in a
100-year flood occurrence, is seven feet above mean sea level. In other words, the entire island
would be covered by 12-22 feet of water in a 100-year flood event. Hence, the entire island is
presently classified by FEMA as being within the 100-year floodplain.
There are significant flood-related infrastructure needs on the island. During flood events in
early 2006, severe winds and high water caused damage to the District’s levees and erosion
protection, and removed portions of the levee crest.218 The waterside slopes of the levees need
additional rock riprap, especially along the northern, eastern and western levee segments.219 The
District reported that this will cost between $4 million and $5 million to complete.
214 Water Code §12311.
215 For a detailed explanation of levee standards and specifications, please refer to chapter 4.
216 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 7.
217 Ibid., p. 6.
218 RD 2059 letter to U.S. Army Corps of Engineers dated January 27, 2006, stating intent to participate in projects consistent with the
CALFED Bay-Delta Authorization Act.
219 Ibid.
BY BURR CONSULTING 147
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Figure 11-2: RD 2059 Levee Crack
Other significant improvements
needed pertain to the rehabilitation
of over 3.5 miles of levees that do
not meet HMP standards.
Significant deficiencies are found in
these levees, including cracking and
levee heights below HMP
standards.220 Rehabilitation plans
for the levees call for “raising the
crest two feet above the 100-year
flood level, providing at least a 16-
foot wide levee crest, and placing a
wide toe berm to buttress the
landside slope.”221 The District
estimated that levee rehabilitation
will cost between $1.0 million and
$1.5 million per levee mile. The District reported that major cracks in the levees (shown in Figure
11-2) were repaired in Winter 2009 by digging out the affected area and recompacting the levee
section.
The District also reported major structural deficiencies at its pumping station as an infrastructure
need that has yet to be addressed.222 The existing pump station has shifted and rotated on its
foundation, and is in danger of falling over. 223
The District funds major maintenance activities primarily through the DWR special projects
program. A recent major project completed through DWR special projects funding was a nearly
$2.5 million habitat mitigation project that occurred in FY 06-07. The project restored 50 acres of
habitat in the western portion of the island by planting five varieties of native plants and creating a
three-acre freshwater marsh. Restoration of wetlands from former farmlands is expected to slow or
reverse island subsidence in the Delta.224
220 The Sacramento Bee, “Idyllic existence hangs in balance,” December 14, 2008, Special Report p. 8.
221 RD 2059 letter to U.S. Army Corps of Engineers dated January 27, 2006, stating intent to participate in projects consistent with the
CALFED Bay-Delta Authorization Act.
222 Interview with District Manager Anglia Tant, December 11, 2008.
223 Hultgren-Tillis Engineers, Bradford Island Levee Rehabilitation Geotechnical Investigation, October 26, 2005.
224 http://www.water.ca.gov/floodmgmt/dsmo/bdlb/opp/subsidence.cfm
148 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2059 (BRADFORD ISLAND)
Table 11-3: RD 2059 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance By Contract Weed Abatement By Contract
Flood Control By Contract Slope Protection By Contract
Drainage By Contract Vector/Rodent Control By Contract
Upkeep of Levee Access Roads By Contract Levee Patrol By Contract
Ferry Service By Contract Flood Fighting By Contract
District Overview
Total Levee Miles 7.5 Surface Elevation -5 to -15 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 3.5 Dry Land Levee 0.0
HMP Standard 4.0 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 7.5
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes - 7 mi. Pump Station(s) Yes - 1
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A2 Base Flood Elevation 7 ft.
Levee Inspection Practices
The District does not conduct formal levee inspections but does keep written inspection reports. Informal
levee inspections are conducted by the Levee Superintendent at least once per week.
Levee Inspection Reports
Most Recent Written Inspection NA Inspection Rating NA
Levee Segment Description Condition
San Joaquin River Northern District boundary 0.15 mi. at HMP, 1.75 mi. <HMP
San Joaquin River Western District boundary 1.9 mi. at HMP
False River Southern District boundary 1.6 mi. at HMP
Fisherman's Cut Eastern District boundary 0.35 mi. at HMP, 1.75 mi. <HMP
Levee Maintenance
Miles Rehabilitated, FY 07-08 0.0 Miles Needing Rehabilitation 3.5
% Rehabilitated, FY 07-08 0% % Needing Rehabilitation 47%
Rehabilitation Cost per Levee Mile1 NA Maintenance Cost per Levee Mile2 $2,244
Infrastructure Needs/Deficiencies
Infrastructure needs include additional rock riprap for the waterside slopes of the levees and rehabilitation of
three and a half miles of levees that do not meet HMP standards. Significant deficiencies in these levees
include cracking and levee heights below HMP.
Note:
(1) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number of
miles rehabilitated in FY 07-08.
(2) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 149
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
Consolidation for RD 2059 does not appear to be a feasible option at this time due to the poor
financial standing of the District. The District reported that its financial ability to provide service is
severely limited, and that the District does not have enough funds to sufficiently maintain the island
or its pump station. A large portion of District revenues are used to fund operation of the ferry to
Bradford Island, and the District reported that the revenues generated from assessments are not
enough to maintain the ferry service and maintain the levees on a regular basis. The District
reported that it is looking into generating additional funding by means of a Proposition 218 election,
requesting funds from the County and requesting a reimbursable share of cost expense from Rosetta
Resources, a large landowner on the island; however, none of the above have been finalized as of
the drafting of this report.
RD 2059 is open to consolidation with a neighboring reclamation district, because additional
revenues could help the District address its backlog of deferred maintenance. The District requires
a new pump station, which is not eligible for DWR funding, and the District does not have the
financial resources on its own to do so at this time.
Possible consolidation partners include RD 830 (Jersey Island) to the south or RD 2026 (Webb
Tract) to the east. RD 2026 would make a logical consolidation partner due to its reliance on the
ferry for service to the island, which would allow for increased cost sharing between the two
Districts. However, both RD 830 and RD 2026 expressed an unwillingness to consolidate with RD
2059, due to the backlog of deferred levee and pump station maintenance, and not wanting to take
responsibility for the long-neglected levees.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) There were 48 residents in the District, according to 2000 Census data. There has been no
recent growth within the District, and minimal growth is anticipated in the future as the
District is outside of the countywide urban limit line (ULL). There are no planned or
proposed development projects on Bradford Island.
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
2) Bradford Island is one of the eight western Delta islands that DWR has identified as critical
to control of salinity in the Delta, protecting water quality to all water users in the state.
3) Four miles of levees currently meet the HMP standard. Three and a half miles of levees do
not meet the HMP standard and will require significant rehabilitation.
150 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2059 (BRADFORD ISLAND)
4) Deficiencies in the levees include cracking and levee heights below HMP. District guidelines
indicate that levees should be rehabilitated to between two and three feet above the 100-year
flood level, to accommodate for subsidence.
5) Infrastructure needs for the district include rehabilitation of 3.5 miles of levees to meet the
District’s adopted guidelines for levee specifications. The District also identified
replacement of the existing pump station as an infrastructure need that has been deferred for
many years due to a lack of funds.
6) The District spent approximately $2,200 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
7) The District reported that the most significant service challenge is providing adequate
services given limited financing and staffing levels.
8) The District had not prepared a multi-year capital improvement plan as of the drafting of
this report; however, the District reported that it plans to complete a five-year plan by FY
09-10.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
9) The District has demonstrated the financial ability to provide minimally adequate service to
portions of the District. Various infrastructure needs have been deferred due to a lack of
available funds. In recent years, the District has relied on DWR special projects funding for
needed levee improvements, as the District lacks the funds to upgrade levees on its own.
10) The District receives 100 percent funding from DWR for special projects (no cost share) due
to its importance in the Delta under Water Code §12311, and the District’s inability to pay
for levee rehabilitation on its own (per its 1990s Ability-to-Pay study submitted to DWR).
11) The District reported that it participates in the DWR subventions program (submits annual
applications), but does not receive reimbursement from DWR due to insufficient
maintenance expenditures per levee mile. Qualifying for DWR subventions funds is a goal
for the District.
12) The District was in the process of updating its assessment as of the drafting of this report, in
order to improve its financial ability to provide services. The District engineer completed an
assessment report and accompanying 20-year budget worksheet in December 2008;
however, the District had yet to conduct the required Proposition 218 election.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
13) The Agency does not practice significant facility sharing, and no opportunities for shared
facilities were identified.
BY BURR CONSULTING 151
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
14) Accountability to local voters is constrained by a lack of contested elections.
15) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
16) The District maintains a website as part of its community outreach efforts.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds.
AGENCY PROPOSAL
The agency reported a desire to retain its existing coterminous SOI if consolidation with a
neighboring reclamation district is not possible.
SOI OPTIONS
Given the considerations addressed in the MSR, two options are identified for the RD 2059
SOI:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas within
its SOI in its long-term planning.
SOI Option #2 – Zero SOI to signaling future consolidation
Adopting a zero SOI for RD 2059 to signal future consolidation is an option. The District
reported various financing constraints, including a significant backlog of deferred maintenance, and
minimal service levels. RD 2059 is open to consolidation with a neighboring reclamation district;
however, neither RD 830 nor RD 2026 are agreeable to consolidation with RD 2059.
RECOMMENDATION
Retaining the existing coterminous SOI is recommended for RD 2059, given that consolidation
with a neighboring reclamation district does not appear feasible at this time.
152 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2059 (BRADFORD ISLAND)
Table 11-4: RD 2059 SOI Analysis
Issue Comments
SOI update Retain existing coterminous SOI.
recommendation
Services provided RD 2059 provides maintenance services to non-project levees and internal
drainage facilities.
Present and planned Present land uses in the area are agricultural, commercial, residential,
land uses in the area recreational, and gas extraction. Local business activity consists primarily
of cattle grazing and small commercial operations. No new land uses are
anticipated in the future.
Location of facilities, Levees protected by the Districts are located around the perimeter of the
infrastructure and island. Internal drainage facilities run north-south and east-west through
natural features the District. The pumping station is located near the mid-way point of the
eastern District boundary. Natural features that affect service provision
are the Delta waterways, and island surface and floodplain elevations.
Projected growth in the There is no significant growth projected in RD 2059.
District/Recommended
SOI
Present and probable There is a present and probable need for levee maintenance services on the
need for public facilities island, as the levee system has significant rehabilitation needs.
and services in the area
Opportunity for infill No SOI expansion is recommended and no development is projected on
development rather than the island.
SOI expansion
Service capacity and The MSR identified financing as the major constraint to levee maintenance
adequacy and rehabilitation efforts. There is a significant backlog of deferred
maintenance and levee improvements due to insufficient financing levels.
Social or economic Communities of interest include the 71 landowners on the island.
communities of interest
Effects on other Retaining the existing coterminous SOI would have no effect on other
agencies agencies.
Potential for No potential consolidation opportunities were identified. Neighboring
consolidations or other reclamation service providers do not seem to be a good match for
reorganizations when consolidation due to significant differences in revenues and deferred levee
boundaries divide and drainage maintenance and rehabilitation needs.
communities
Willingness to serve The District has demonstrated a willingness to serve by providing levee
maintenance to Bradford Island since 1921.
Potential effects on Retaining the existing coterminous SOI would allow the District to
agricultural and open continue to serve its boundary area, which is comprised of agricultural
space lands lands primarily used for cattle grazing.
Potential environmental Although no potential environmental impacts were identified in the MSR,
impacts the LAFCO counsel and planner should make CEQA determinations.
BY BURR CONSULTING 153
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
12. R E C L A M AT I O N D I S T R I C T 2 0 6 5
( V E A L E T R AC T )
Reclamation District 2065 (Veale Tract) provides maintenance services to non-project levees and
internal drainage facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2065 was formed on April 22, 1923 as an independent special district.
The District was formed to provide the reclamation of lands within District boundaries.
The principal act that governs the District is the Reclamation District Act.225 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,226 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,227 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,228 and 4) retain an agricultural
expert to advise landowners.229 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.230
The District’s boundary is located entirely within Contra Costa County and is on the westerly
edge of the Delta approximately two miles east of the community of Knightsen, as shown in Map
12-1. The boundaries encompass 1,365 acres (approximately 2.1 square miles). Contra Costa is the
principal county and Contra Costa LAFCO has jurisdiction. A majority of the District is within the
Secondary Zone of the Sacramento-San Joaquin Delta, but the westerly portion of the District along
with the community of Knightsen is within the Primary Zone. The District is outside the
countywide urban limit line (ULL).
225 California Water Code, Division 15, §50000-53903.
226 California Water Code §50932.
227 California Water Code §50910.
228 California Water Code §50933.
229 California Water Code §50952.
230 Government Code §56824.10.
154 PREPARED FOR CONTRA COSTA LAFCO
D Boundary and Coterminous SOI
Map 12-1 R 2065
Reclamation District
Levees
City Boundaries
Ú[
Pumping Stations
d
v
Bl
OOaakklleeyy
d Holland Tract
Hotchkiss Tract n
u
o
m
d
n
a
S
Holland Tract Rd
Rock Slough
Ú[
KKnniigghhttsseenn
Delta Rd Cut
e Ln
Veale Tract
Ú[
e Rd
Dredger
r
e
n
r
e
W
y
w Eagle Ln
H
n
o
r Dead Dog Slough
B y Orwood and Palm Tracts
t Dr
y Ln
Bixler Tract
al Ln
Orwood Rd
®
This map was created by the Contra Costa County Community
65 by 1 C P o in n e t r S a t C re o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e d 1 W u 2 n 7 2 i i / n t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 r e . 9 3 t l i o n 8 p e 4 m z W , e C n A t, G 94 IS 55 G 3 r - o 0 u 0 p 95 a b r T e a h a s D is s e i e t . s m d v W e a c a l u t p o a h r p , r i c l e m e p o n n r o e i t t m n b a s t l t i a i n a g D r s t a i e l e y t c e p i o C f d a p t i r h t t y t y o m e r i L g u e s i h s n m o e t t u e i t w r t d s c h i , e t i i s h n i s i f s d d o d a a r c e m t t i a a r te i a v t f d t h e r i . o o d e U n m f C s r a o t e o n h m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C S t a b t o e a p e s s t t e a a a n g l B o t C e r o e r r o e a e e u r s d n d t p . o t o y o I r n t f e G s E m a i I b q d S a i u y l a i P a t n y b r li d o e z f o g a a r r r t e c a i i o p c t m s n e ro ' . p s a d S t c t u t c a o h c u m x e e r r d a e a c i t n y e . 0 0.125 0.25 0.5 Miles
County of Contra Costa disclaimer of liability for geographic information.
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries. 231
Boundary History
LAFCO records indicate that there have been no boundary changes for RD 2065 since 1965.232
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a three-member board. Board members must be landowners or
legal representatives of a landowner and are elected or appointed by the County Board of
Supervisors to staggered four-year terms. Elections, however, are very rare, as there are only five
landowners within the District. Vacancies on the governing body are typically filled by appointment
by the remaining Board members pursuant to Government Code § 1780. RD 2065 board members
serve on a volunteer basis and do not receive compensation.
Table 12-1: RD 2065 Governing Body
Reclamation District 2065 Veale Tract
Governing Body
Name Position Began Serving Term Expires
Coleman Foley President 1995 2009
Members
Thomas E. Baldocchi, Sr. Member 1996 2011
Thomas E. Baldocchi, Jr. Member 2005 2009
Board member must be a landowner or legal representative of a landowner
Manner of Selection within the District. For uncontested elections, appointments are made by the
remaining Board members.
Length of Term Four years
Meetings Date: As needed Location: Varies
Agenda Distribution To all landowners; posted at Secretary's Office.
Minutes Distribution To all meeting attendees; available to anyone upon request.
Contact
Contact Secretary and Counsel
Mailing Address Nomellini, Grilli & McDaniel P.O. Box 1461 Stockton, CA 95201
Email/Website dantejr@pacbell.net/No website
The District does not conduct constituent outreach activities, but keeps the landowners apprised
of District activities. The Board meets on an “as needed” basis, usually two to three times per year.
Meeting agendas are posted at the District Secretary’s office, and agendas are mailed to each
landowner. Minutes of the previous meeting are distributed to those attending the following
meeting. Agendas and minutes are also available by request. The most recent Board meeting was
on June 30, 2008.
231 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
232 Contra Costa LAFCO records begin in 1965 and show no boundary changes to RD 2065.
156 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2065 (VEALE TRACT)
With regard to customer service, complaints may be filed with any Trustee or the District
Secretary. If the complaint merited formal District action, any such complaint would be placed on
the next Board agenda for discussion/resolution. Within FY 07-08 there were no complaints filed.
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
LAFCO map inquiries and document requests.
SERVICE DEMAND AND GROWTH
Access to RD 2065 is via Delta Road through Knightsen from SR 4, or from the south via
Byron Highway. Delta Road traverses a portion of Veal Tract. (Refer to Map 12-1.) Farm service
roads provide limited access from the west, with a perimeter levee road along the north, east and
south sides of the District.
The District boundaries encompass primarily agricultural lands (row crops, alfalfa, and irrigated
pasture) along with two single-family dwellings, farm worker housing, and out-buildings. The State
Farmland Mapping and Monitoring Program classifies agricultural land in the District as Prime
Farmland (approximately 60 acres), Farmland of Statewide Importance (950 acres), Unique
Farmland (100 acres), and Farmland of Local Importance (150 acres). There is no Williamson Act
contracted land within the District.
The District considers its customer base to be its five landowners. There were 14 residents in
the District, according to Board Member Tom Baldocchi, Jr. The District’s population density was
6.6 persons per square mile, compared with the 2008 countywide density of 1,318. The area has not
experienced significant recent growth, and does not anticipate changes in service demand in the
future. There is however, a proposal by Delta View Properties LLC to split a 74-acre parcel into
three homesites. The proposed subdivision is located along Rock Slough just east of Delta Road.
Of concern to the District are matters such as the encroachment of the homesites and waterside
docks and related improvements on or near the adjacent levee and levee seepage canal, and the
resulting interference with the District’s operation, maintenance and improvement of that levee and
canal. Although the District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies, the concerns of the District have been related to the Contra Costa
County Community Development Division.
MANAGEMENT
The District utilizes a volunteer staff (primarily Board Members) as well as the District’s
engineer to monitor the levees and activity on the Tract. The District contracts for legal and
engineering services.
The District does not adopt an annual budget, but does have annual financial reports prepared
by an independent auditor. The most recent audited financial statement provided to LAFCO by the
District was for FY 07-08. The District did not have an updated capital improvement plan in place
as of the drafting of this report; however, the District indicated that it will likely have a Five Year
Levee Improvement Plan in place by FY 09-10 in order to meet new Department of Water
Resources (DWR) requirements for participating in DWR’s ‘Special Levee Project’ program.
BY BURR CONSULTING 157
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
FINANCING
The District’s financial ability to provide services is currently constrained. The District went
into debt in April of 2005 in order to perform emergency erosion repair work. The District took
out a loan from the Bank of Stockton in the amount of $300,000 with a 6.5 percent interest rate.
Thereafter, during the December 2005-January 2006 flood disaster, the District suffered additional
substantial erosion which required immediate repair and which ultimately impaired the District’s
ability to pay back the loan as quickly as originally intended. A sizeable portion of that loan is still
outstanding.
Figure 12-1: RD 2065 Expenditures, FY 04-05 through FY 07-08
District expenditures fluctuate year to
$800,000
year as funds become available for specific
projects. The expenditure spikes in FY 04- $700,000
05 and FY 05-06 were the result of $600,000
emergency levee work to repair flood
$500,000
damage as well as the ‘CALFED Rock
$400,000
Slough Water Quality Improvement
$300,000
Project’ whereby the District cooperated
with CALFED to relocate its drainage $200,000
discharge point from Rock Slough to the
$100,000
south side of the District at Dead Dog
$0
Slough. This required the establishment a
FY 04-05 FY 05-06 FY 06-07 FY 07-08
new pump station at that location.
CALFED paid for the costs of the project
by advancing funds to the District to pay the various expenses as they became due.
The District received $267,428 in revenues in FY 06-07 and $58,701 in FY 07-08. RD 2065
relies primarily on landowner assessments which normally generate 30% percent of operating
revenues, and reimbursements from the State under the subventions program (44%). The District
does not receive any property tax revenue. The District levied assessments of approximately $50 per
acre on agricultural land in FY 07-08.
Total expenditures for FY 06-07 were $323,559, with reductions to $72,713 in FY 07-08. The
vast majority of expenditures were for levee repair and maintenance (68% over the past two years).
The District spent approximately $5,400 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
In order to achieve a balanced budget, the District transferred $110,145 in FY 06-07 and $25,203
in FY 07-08 from the Special Revenue Fund to the General Fund to finance activities of the General
Fund. As of June 30, 2008, the District fund balance was $2,119. Budget details for the past two
fiscal years are contained in Table 12-2.
158 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2065 (VEALE TRACT)
Table 12-2: RD 2065 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
Reclamation services are financed primarily by assessments and DWR subventions.
Development Fees and Requirements
Agricultural (per acre) None
Residential (per unit) Single Family: None Multi-Family: None
Non-residential (per 1,000 sq. ft.) Commercial: None Industrial: None
Development Requirements: New development must contruct levees to PL 84-99 Standard.
RD 2065 Audited Financial Statements
Revenues FY 06-07 FY 07-08 Expenditures FY 06-07 FY 07-08
Total $267,428 $58,701 Total $323,559 $72,713
Property Tax 0 0 Operations 259,754 37,448
Assessments 81,470 30,000 Drainage & Utilities1 16,268 10,156
Intergovernmental Revenues 116,674 18,674 Levee Maintenance2 243,486 27,292
Levee Maintenance 116,674 18,674 Capital Improvements3 0 0
Capital Improvements 0 0 Administrative4 105 150
Development Impact Fees 0 0 Professional Fees5 3,375 2,921
Interest 0 0 Insurance 15,580 8,106
Other Revenues - Reimbursements 69,284 10,027 Miscellaneous6 44,745 24,088
Notes:
(1) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(2) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance expenditures
are those that are necessary to maintain the levee to its existing standard of protection.
(3) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing a
cross-section, engineering studies, etc.).
(4) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(5) Legal and accounting services.
(6) Miscellaneous expenditures include debt service (principal and interest).
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2065 operates, maintains, and at times, improves non-project levees and internal drainage
facilities on Veale Tract. The District conducts direct services for vegetation removal, weed
abatement and upkeep of access roads as part of its levee maintenance work. Rodent/vector control
is carried out in conjunction with the Contra Costa County Agricultural Commissioner, who bills the
District for services. The District is also responsible for flood fighting and levee patrol during high
water events. The District’s efforts over the past few years have centered on levee maintenance in
an effort to meet and maintain the HMP Standard.
BY BURR CONSULTING 159
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
LOCATION
RD 2065 provides services within its boundary area. The District’s planning area consists of
seven parcels of record and a total of 1,365 acres. District levees protect the north, east and west
sides of the Tract, however, there is no ‘cross levee’ along the western boundary of the District. The
District receives stormwater runoff from properties west of the District (toward Knightsen), which
places an additional burden on the District’s pumps, and the District also provides flood protection
to a substantial portion of such properties. The Board is considering various scenarios to address
this issue, including annexation of the runoff and flood protected properties, or some other method
to reduce the financial burden on landowners within RD 2065 and more fairly allocate those costs
among those who benefit from RD 2065’s services.
INFRASTRUCTURE
Key infrastructure in the District includes over five miles of levees, as well as internal drainage
channels and two pump stations. Levees are constructed out of earthen materials with rock rip rap
on some sections of the water side. Because of the combination of high tides, high wind and high
waves, District levees sustained damage during the December 2005- January 2006 storms.
Approximately $170,000 in repair work was required.
Figure 12-2: RD 2065 Rock Slough Levee
The District reports that existing levees
meet the Hazard Mitigation Plan (HMP)
Standard (one foot above the 100-year
flood level) except for that portion of the
Rock Slough levee west of Delta Road.
This area is at a higher ground elevation,
and not subject to the more severe
conditions of the remaining levee system.
The District is within Flood Zone A2, with
a base flood elevation of 7-feet above sea
level for Veale Tract. Ground elevations
within the interior of the Tract vary
between 4-feet below sea level to 2-feet
above sea level. This means the entire area
would be covered by 5-11 feet of water in
a high-water event. Hence, the entire District is presently classified by FEMA to be within the 100-
year floodplain.
Subsidence is not an issue, although the easterly half of the District exhibits peat soils up to 10-
feet deep.
A summary of services, facilities and conditions is provided in Table 12-3.
160 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2065 (VEALE TRACT)
Table 12-3: RD 2065 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Direct Weed Abatement Direct
Flood Control Direct Slope Protection Direct
Drainage Direct Vector/Rodent Control Direct &Contract
Upkeep of Levee Access Roads Direct Levee Patrol Direct
Irrigation Water None Flood Fighting Direct
District Overview
Total Levee Miles 5.1 Surface Elevation -4 to 2 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 0.9 Dry Land Levee 0
HMP Standard 4.2 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 5.1
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) Yes -2
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A2 Base Flood Elevation 7 ft. above sea level
Levee Inspection Practices
Inspected regularly by Trustees who are landowners; inspections by the District Engineer when requested.
Levee Inspection Reports
Most Recent Written Inspection NP¹ Inspection Rating NP
Levee Segment Description Condition
Rock Slough (west of Delta Road) Lower levee at end of Rock Slough Poor
Rock Slough (east of Delta Road) Earthen levee with intermittent rip rap Fair
Werner Dredger Cut Earthen levee with intermittent rip rap Fair
Dead Dog Slough Earthen levee at end of Dead Dog Slough Fair
Levee Maintenance
Miles Rehabilitated, FY 07-08 0.0 Miles Needing Rehabilitation 0.9
Percent Rehabilitated 0% Percent Needing Rehabilitation 18%
Rehabilitation Cost per Levee Mile² NA Maintenance Cost per Levee Mile³ $5,400
Infrastructure Needs/Deficiencies
The District's long-range levee rehabilitation/improvement plan is to meet and maintain the HMP Standard.
Notes:
(1) NP = Not Provided
(2) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number
of levee miles rehabilitated in FY 07-08.
(3) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 161
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
Several governance alternatives are discussed below.
RD 2065 is in a difficult position with respect to District operations and its overall revenue base.
There are a limited number of property owners who bear a disproportionate share of District costs.
Funds have been depleted, loan payments are ongoing, and the annual landowner assessment is
high. Levees are in need of additional rehabilitation, and storm water runoff from the west causes
an additional pumping burden on the District. However, given these difficulties, the District has no
intention of disbanding.
One option would be to expand the District SOI to the west and annex those properties that
benefit from District pumping and flood control services. The assessment rate for this area would
need to be in proportion to the benefits received and would need to take into consideration the
extent to which such properties benefit from each type of service. However, this option would
conflict with the Knightsen Community Services District as described below.
Another option would be to consolidate with another reclamation district, most likely RD 2024
(Orwood and Palm Tracts) to the east, or RD 799 (Hotchkiss Tract) to the northwest. Both RD
2065 and RD 2024 are primarily agriculture, so that compatibility could allow for consolidation.
However, these districts are separated by Werner Dredger Cut. RD 799 is separated from Veale
Tract by only the ending reach of Rock Slough, but is involved with residential development, while
RD 2065 is not. RD 2121 (Bixler Tract) to the south across Dead Dog Slough is probably not an
option, as RD 2121 is not an active reclamation district. RD 2024 would be a logical successor
agency, as it has completed extensive rehabilitation of its levees and is in sound financial condition.
A remote possibility involves collaborating with the Knightsen Town Community Services
District (KCSD), whose eastern border is coterminous with Veale Tract. However, KCSD is in a
start-up mode, and does not yet have the ability to take on additional responsibilities.233
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The 2008 residential population within the district was 14. Up to three households could be
added if the proposed Delta View Properties subdivision is completed.
2) A majority of the District is within the Secondary Zone of the Delta (which does not
prohibit development), but is not within the countywide ULL. In December of 2007,
LAFCO reduced the SOI’s for both Diablo Water District and Ironhouse Sanitary District
by removing Veale Tract from the respective SOI’s. Therefore, any residential development,
233 Knightsen Town Community Services District, East County Sub-Regional Municipal Service Review, Contra Costa LAFCO,
December 2008.
162 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2065 (VEALE TRACT)
(including the Delta View Properties project) would need to rely on individual wells and
septic systems.
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
3) The District provides minimally adequate service given financial and staffing constraints.
4) A majority of the levees serving Veale Tract currently meet the HMP standard, providing
100-year flood protection. The westerly leg of Rock Slough west of Delta Road does not
meet the HMP standard and is in poor condition. It is less vulnerable to collapse however,
due to its location at the end of Rock Slough on higher ground.
5) The District spent approximately $5,400 on maintenance costs per levee mile in FY 07-08.
This was significantly less than the $55,600 per levee mile spent in FY 06-07, and the
countywide median level of $9,900 per levee mile in FY 07-08.
6) The District currently has two pump stations; however, it has an agreement with Contra
Costa Water District to utilize the newly constructed pump station on the south side of the
District which discharges to Dead Dog Slough. This avoids discharge to Rock Slough on
the north from which CCWD derives a portion of its drinking water.
7) The most significant service challenge facing the District is to balance its limited financial
resources with the need for levee improvements.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
8) The District assesses property owners $50 per acre for agricultural land. This is higher than
most reclamation districts in the county, but only generates $68,000 annually for District
operations.
9) State and federal reimbursements or advances for levee work are initially deposited into
“special funds” and then immediately transferred to the District’s general fund.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
10) The District does not practice significant facility sharing.
11) Consolidation with an adjacent reclamation district may provide opportunities for future
facility sharing.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
12) The District conducts limited community outreach and involvement activities, primarily
geared to the District landowners.
BY BURR CONSULTING 163
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
13) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
14) A government structure option is to consolidate with RD 2024.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
AGENCY PROPOSAL
The District reported a desire to retain its existing coterminous SOI, with possible consideration
for expanding the SOI to the west to include those properties which benefit from drainage and/or
flood protection services provided by the District.
SOI OPTIONS
Given the considerations addressed in the Municipal Service Review, three options are identified
for the RD 2065 SOI:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
SOI Option #2 – Expand the SOI
Expansion of the District SOI westerly into Knightsen would allow the District to address the
drainage and/or flood protection issues which affect its operations. This SOI expansion can be
supported if the Knightsen Town Community Services District is not able to independently provide
drainage and/or flood control services to the area currently receiving these de facto services from RD
2065.
SOI Option #3 – Adopt a Zero SOI
Adoption of a ‘zero sphere’ would indicate the future elimination of the District, most likely in
terms of annexing RD 2065 territory to the adjacent RD 2024. RD 2024 has demonstrated its ability
to serve its customers, and annexation of RD 2065 would allow for additional economies of scale in
providing services.
RECOMMENDATION
Retain the existing coterminous SOI and require the District to report back to LAFCO within
one-year on the feasibility of expanding the SOI to the west, after having consulted with the affected
property owners and the Knightsen Town Community Services District.
164 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2065 (VEALE TRACT)
Table 12-4: RD 2065 SOI Analysis
Issue Comments
SOI update Retain the existing coterminous SOI and require the District to explore
recommendation expansion of the SOI to the west.
Services provided Maintenance services to non-project levees and internal drainage facilities
on Veale Tract.
Present and planned The District bounds encompass primarily agricultural land with limited
land uses in the area rural residential development.
Location of facilities, Levees protected by the District are located on the north, east and south
infrastructure and sides of Veale Tract. Internal drainage facilities and pump stations are
natural features located on the north and south levees.
Projected growth in the There is the possibility for three new homesites within the District/SOI.
District/Recommended
SOI
Present and probable There is a present and probable need for levee and drainage maintenance
need for public facilities services in the District. Levee protection is important to the continued
and services in the area use of the land for agricultural production, given the land elevation of up
to four feet below sea level.
Opportunity for infill The potential exists for additional residential homesites on five to 40-
development rather than acre parcels.
SOI expansion
Service capacity and The District is able to provide minimal services to protect the reclaimed
adequacy land on Veale Tract.
Social or economic The economic community of interest is the five property owners within
communities of interest the District.
Effects on other Expanding the SOI to the west will have an effect on the Knightsen
agencies Town CSD.
Potential for There is potential to annex RD 2065 (Veale Tract) to another district
consolidations or other (i.e., RD 2024) especially if RD 2065 becomes insolvent or cannot
reorganizations when continue to provide services.
boundaries divide
communities
Willingness to serve The District has demonstrated a willingness to serve by providing levee
maintenance in the area since 1923. The District has persevered with
limited financial resources and a limited number of participating
landowners.
Potential effects on Veale Tract is outside the countywide ULL and should remain as
agricultural and open agriculture for the foreseeable future. Large-lot residential development
space lands will compromise the agricultural activities on the Tract.
Potential environmental Although no potential environmental impacts were identified in the
impacts MSR, the LAFCO counsel and planner should assist the Commission in
making CEQA determinations.
BY BURR CONSULTING 165
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
13. R E C L A M AT I O N D I S T R I C T 2 0 9 0
( QU I M B Y I S L A N D )
Reclamation District 2090 (Quimby Island) provides maintenance and rehabilitation services to
non-project levees.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2090 was formed on March 21, 1918 as an independent special
district. 234 The District was formed primarily for the construction and maintenance of levees and
drainage facilities to protect the area within the District’s boundaries.
The principal act that governs the District is the Reclamation District Act.235 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,236 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,237 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,238 and 4) retain an agricultural
expert to advise landowners.239 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.240
The District’s boundary is located entirely within Contra Costa County. RD 2090 is a Delta
island located in easternmost Contra Costa County, east of Holland Tract and adjacent to the Contra
Costa-San Joaquin County line at Old River, as shown on Map 13-1. The boundaries encompass
789 acres, or approximately 1.2 square miles. Contra Costa is the principal county and Contra Costa
LAFCO has jurisdiction. The District is within the Primary Zone of the Sacramento-San Joaquin
Delta and is outside the countywide urban limit line (ULL).
234 The year of formation was reported by the District. LAFCO and State Board of Equalization records do not date back to District
formation
235 California Water Code, Division 15, §50000-53903.
236 California Water Code §50932.
237 California Water Code §50910.
238 California Water Code §50933.
239 California Water Code §50952.
240 Government Code §56824.10.
166 PREPARED FOR CONTRA COSTA LAFCO
Map 13-1 D Boundary and Coterminous SOI
R 2090
Reclamation District
Levees
City Boundaries
Ú[
Pumping Stations
County Boundary
F r a n k s
O
T r a c t
l
R e c r e a t i o n d
A r e a
R
i
v
e
r
Ú[
h
g
u
o
l
S
Quimby Island
p
e
e
h
S
Holland Tract
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.125 0.25 0.5 Miles
County of Contra Costa disclaimer of liability for geographic information.
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries.241
Boundary History
LAFCO and State Board of Equalization (BOE) records indicate that there have been no
boundary changes for RD 2090 since 1956.242
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a three-member board. Upon request of the District, Board
members are appointed to staggered four-year terms by the County Board of Supervisors. Board
members do not receive a stipend for attending Board meetings.
Table 13-1: RD 2090 Governing Body
Reclamation District 2090 Quimby Island
Governing Body
Name Position Began Serving Term Expires
Lawrence J. Watty Chairman 2002 2011
Members
Bruce C. Stephens Trustee 1991 2011
Rebecca S. DiDomenico Trustee 1991 2009
Landowner elections. Board member must be the landowner or legal
Manner of Selection representative of the landowner. For uncontested elections, appointments are
made by the County Board of Supervisors upon request by the District.
Length of Term Four years
Meetings Date: As needed Location: District office or within the District
Agenda Distribution To all Trustees; posted at the District Secretary's office
Minutes Distribution To all trustees; available by mail upon request.
Contact
Contact District Secretary
Mailing Address 311 E. Main Street, Suite 504 Stockton CA 95202
Email/Website ahoslett@sbcglobal.net/No website
Because the District is under a single ownership, it not considered necessary to conduct
constituent outreach activities. The Board of Trustees meets on an as-needed basis. Notices are
posted and mailed as required by the Brown Act. Any customer complaints can be brought to the
attention of the Board. The District reports that no complaints were received in FY 07-08.
The District demonstrated partial accountability to LAFCO in its disclosure of information and
cooperation with LAFCO. The District did not complete the initial Request for Information
questionnaire; however, the District did respond to interview questions, other LAFCO inquiries and
document requests.
241 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
242 The BOE record for RD 2090 begins in 1956 and shows no boundary changes since then. Contra Costa LAFCO records begin in
1965 and show no boundary changes to RD 2090.
168 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2090 (QUIMBY ISLAND)
SERVICE DEMAND AND GROWTH
Access to Quimby Island is by private boat. Private graveled levee service roads provide
perimeter access around the island. (Refer to Map 13-1.)
The District bounds encompass agricultural activities with farm buildings, a primary residence,
caretaker residence, and farm worker quarters. The primary crop is feed-type corn, with wheat
grown on the land side of the levee slope. The State Farmland Mapping and Monitoring Program
classifies agricultural land in the District as Prime Farmland (approximately 650 acres), Unique
Farmland (60 acres), and Farmland of Local Importance (35 acres). All of the land within the
District is under Williamson Act Contract.
The interests of the landowner Ellis Island Farms, Inc., and its principal Ellis Stephens, are
considered to be the customer base for the District. The resident population of the island is one
person, with four to five persons seasonally. The District’s population density is 1 person per square
mile, compared to a countywide density of 1,318, according to the 2000 Census. The area has not
experienced any growth, and changes in service demand in the future are not anticipated.
MANAGEMENT
Maintenance operations are overseen by the landowner, and carried out by the District under
contract. Legal and engineering services are provided by contract.
Levee inspections, which are conducted twice per day, are conducted by employees of Ellis
Island Farms. They are also responsible for pump maintenance. The District does not have a
formal levee inspection procedure and does not keep written inspection reports.
The District does not adopt an annual budget, but does have annual financial reports prepared
by an independent auditor. The most recent audited financial statement provided to LAFCO by the
District was for FY 07-08. The District did not have an updated capital improvement plan in place
as of the drafting of this report; however, the District’s engineer has applied for a Special Projects
Grant to prepare a five-year plan.
FINANCING
The District’s financial ability to provide services is contingent upon the willingness of the
landowner to participate in District operations. The landowner was assessed $410,000 in FY 06-07
and $1,125,000 in FY 07-08. Since there is only one landowner within the District, the Board of
Trustees assesses the landowner the amount that the District feels is necessary to provide for the
District’s activities and responsibilities. State subventions make up the remainder of District
revenues. The District does not receive any property tax revenue. Revenues are detailed in Table
13-2.
BY BURR CONSULTING 169
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Figure 13-1: RD 2090 Expenditures, FY 04-05 through FY 07-08
District expenditures fluctuate year to $1,200,000
year as financing relies on assessments, which
is the primary source of funding. $1,000,000
Expenditures were higher in FY 07-08 than in
$800,000
previous years due to significant maintenance
activities performed that year. To a lesser $600,000
extent levee maintenance needs and efforts
also fluctuate somewhat from year to year. $400,000
For example, the District performed relatively
$200,000
less maintenance in FY 05-06 than in other
recent years. Revenue fluctuations have $0
generally followed the expenditure trend, with
FY 04-05 FY 05-06 FY 06-07 FY 07-08
higher intergovernmental revenues in FY 07-
08 than in previous years due to a greater
volume of reimbursable projects that year.
District expenditures fluctuate year to year as costs for operations vary according the work effort
needed to maintain the levees and drainage system. For FY 06-07, the District expended $520,345
on operations, which increased to $946,561 in FY 07-08. The District spent approximately $129,400
on maintenance costs per levee mile in FY 07-08, compared to a countywide median level of $9,900
per levee mile.
Identified levee repairs and pump servicing are carried out under the direction of the
landowner’s representative. During this two-year period no levee rehabilitation work was
conducted. Details are provided in Table 13-2.
The District does not have a formal policy on maintaining financial reserves. The District had
$297,341 in unrestricted net assets as of June 30, 2008, which are on deposit with the Contra Costa
County Treasurer. The unreserved balance constituted 31 percent of annual expenditures in FY 07-
08. The District does not have any short or long term debt.
170 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2090 (QUIMBY ISLAND)
Table 13-2: RD 2090 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
Reclamation services are financed primarily by assessments (84%) and DWR subventions (16%).
Development Fees and Requirements
Agricultural (per acre) None
Residential (per unit) Single Family: None Multi-Family: None
Non-residential (per 1,000 sq. ft.)Commercial: None Industrial: None
Development Requirements: None
RD 2090 Audited Financial Statements
Revenues FY 06-07 FY 07-08 Expenditures FY 06-07 FY 07-08
Total $552,836 $1,230,392 Total $536,052 $961,057
Property Tax 0 0 Operations 520,345 946,561
Assessments 410,000 1,125,000 Drainage & Utilities1 55,366 41,085
Intergovernmental Revenues 142,836 105,392 Levee Maintenance2 464,979 905,476
Levee Maintenance 142,836 105,392 Capital Improvements3 0 0
Capital Improvements 0 0 Administrative4 6,343 4,880
Development Impact Fees 0 0 Professional Fees5 6,054 6,291
Interest 0 0 Insurance 3,310 3,325
Other Revenues 0 0 Miscellaneous6 0 0
Notes:
(1) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(2) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(3) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(4) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(5) Legal and accounting services.
(6) Miscellaneous expenditures.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2090 provides levee maintenance and internal drainage services through a contract with Ellis
Island Farms. The District also contracts with Ellis for vegetation removal, weed abatement,
vector/rodent control, and upkeep of access roads as part of the levee maintenance work. The
District is also responsible for flood fighting and levee patrol during high water events. Habitat
improvements on the island floor (including the planting of thousands of trees) are being
undertaken by the landowner and are not part of the District’s responsibilities.
BY BURR CONSULTING 171
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
LOCATION
RD 2090 provides services within its boundary area, and to levees around the perimeter of
Quimby Island. The District does not provide any services outside Quimby Island. Because of the
isolated nature of the District, extra effort is needed to transport material and equipment to the site.
In addition, due to the configuration of the island (amoeba-like), the relative small size of the
District (789-acres) requires a disproportionate levee system (7-miles) for protection. This equates
to approximately 113 acres of reclaimed land for each mile of levee. The average among reclamation
districts in Contra Costa County is approximately 304 acres of reclaimed land per levee mile.243
The MSR did not identify documented benefits of continued reclamation of the tracts for
sustaining the fresh water/saltwater balance and health of the Delta, as the area is not identified as a
critical asset by California Water Code §12311. Hence, the benefit area for the District’s reclamation
activities are confined to the District’s boundary area.
INFRASTRUCTURE
Key infrastructure in the District includes 7-miles of non-project levees, as well as two pump
stations located along Sheep Slough. Levees are constructed out of earthen material, and are rated
by the District Engineer as being in good condition, and meeting HMP standards.244
According to DWR, there have been no levee failures on Quimby Island in the 1967-2004
period.245 Likewise, no levee failures or breaches have occurred in the past four years.246 The island
is located within Flood Zone A30, with a base flood elevation of seven feet above sea level. The
ground elevation for the interior of the island averages eight feet below sea level. In other words,
the island would be covered by an average of 15 feet of water during a 100-year flood event.
Quimby Island is classified by FEMA as being within a 100-year floodplain.
Subsidence is an ongoing issue. The District has diligently worked to construct its levees in a
manner to counteract subsidence by building landside berms and flatter backslopes, particularly in
areas prone to greater movement.
A summary of services, facilities and conditions is provided in Table 13-3.
243 Calculation based on MSR data for all 13 reclamation districts.
244 Interview with Christopher Neudeck, District Engineer on March 23, 2009.
245 DWR & DFG, Risks and Options to Reduce Risks to Fisheries and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008.
246 Interview with Christopher Neudeck District Engineer on March 23, 2009.
172 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2090 (QUIMBY ISLAND)
Table 13-3: RD 2090 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Contract Weed Abatement Contract
Flood Control Direct & Contract Slope Protection Contract
Drainage Contract Vector/Rodent Control Contract
Upkeep of Levee Access Roads Contract Levee Patrol Direct & Contract
Irrigation Water None Flood Fighting Direct & Contract
District Overview
Total Levee Miles 7.0 Surface Elevation -5 to -11 ft. with an
average elevation of -8 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 0.0 Dry Land Levee 0.0
HMP Standard 7.0 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 7.0
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) Yes - 2
Detention Basin(s) No Bridges No Ferry - No
Floodplain
FIRM Designation A30 Base Flood Elevation 7-feet above sea level
Levee Inspection Practices
Twice per day by landowner representatives. No formal review program and does not keep written reports.
Levee Inspection Reports
Most Recent Written Inspection NP¹ Inspection Rating NP
Levee Segment Description Condition
Old River Serpintine earthen levee along north, east and south Good
Sheep Slough Earthen levy along west side of island Good
Levee Maintenance
Miles Rehabilitated, FY 06-07 0.0 Miles Needing Rehabilitation NP
Percent Rehabilitated 0% % Needing Rehabilitation NA
Rehabilitation Cost per Levee Mile² NA Maintenance Cost per Levee Mile³ $129,400
Infrastructure Needs/Deficiencies
Routine maintenance as problem areas are identified.
Notes:
(1) NP = Not Provided
(2) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number
of levee miles rehabilitated in FY 07-08.
(4) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 173
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
As a single-landowner reclamation district, the continued functioning of RD 2090 is a direct
consequence of the landowner’s participation in the District, both functionally and monetarily.
Should Ellis Island Farms, Inc. sell the island, responsibility for RD 2090 would fall to the successor
landowner. Should the levees fail, re-construction would be a decision of the landowner.
One fairly remote option, should RD 2090 levees fail, would be to annex the territory to the
adjacent RD 2027 (Mandeville Island) located in San Joaquin County, or RD 2025 (Holland Tract) in
Contra Costa County, which is planned to be operated as primarily wildlife habitat and open space
in the future. However, this would only be feasible if the State were to fund levee repair, as it would
not be in the interests of RD 2027 or 2025 to do so.
Without the reclamation district, Quimby Island could still operate as a private enterprise, with
protection of the reclaimed lands the responsibility of the landowner. This scenario would be based
on the value of the crops produced and the economic viability of the island.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The residential population on the island is one person, with four to five seasonal workers,
according to the District. There has been no recent growth within the District, and no
growth is anticipated in the future as the District is entirely agricultural, and outside of the
countywide urban limit line.
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
2) All levees within the District currently meet HMP standards.
3) All levee rehabilitation projects are performed by contract. The District has no employees,
and contracts out for routine levee maintenance activities with Ellis Island Farms, the sole
landowner within the District.
4) The District provides adequate service based on levee standards.
5) The District spent approximately $129,400 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
6) The District reported that the most significant service challenge is the logistics of
transporting material to and from the island, and in coordinating levee maintenance work
with contractors.
174 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2090 (QUIMBY ISLAND)
7) The District did not have an updated capital improvement plan in place as of the drafting of
this report; however, an application for grant funding has been made to prepare a five-year
plan.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
8) The District has demonstrated the financial ability to provide minimally adequate service.
9) The District reported that the current level of financing is generally sufficient for normal
levee maintenance services; however, major maintenance and rehabilitation activities are only
possible with DWR funding.
10) The annual landowner assessment fluctuates, depending on the perceived needs. A capital
improvement plan would allow the District to anticipate the required assessment amount
over a several year period.
11) The District is dependent upon assessment revenue from a single landowner.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
12) Efficiencies are gained by collaboration and facility sharing efforts with Ellis Island Farms
for the use of equipment and staff for levee maintenance activities.
13) Coordination between Ellis Island Farms and RD 2090 is enhanced by an officer of Ellis
Island Farms serving on the RD 2090 Board.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
14) Accountability to local landowners is achieved by having a close working relationship with
Ellis Island Farms, the sole landowner.
15) The District demonstrated partial accountability to LAFCO in its disclosure of information
and cooperation with LAFCO. The District did not complete the initial Request for
Information questionnaire; however, the District did respond to other LAFCO inquiries and
document requests.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
AGENCY PROPOSAL
The District indicated a desire to retain its existing coterminous SOI.
BY BURR CONSULTING 175
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
SOI OPTIONS
Given the considerations addressed in this Municipal Service Review, two SOI options were
identified:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
SOI Option #2 – Adopt a zero SOI for RD 2090 and expand the SOI of an adjacent
reclamation district to include Quimby Island
Expanding the SOI of either RD 2027 or 2025 to include Quimby Island and adopting a zero
SOI for RD 2090 would signify that consolidation could be initiated. If initiated, the LAFCO with
jurisdiction (San Joaquin LAFCO for RD 2027; Contra Costa LAFCO for RD 2025) would evaluate
consolidation in greater depth and determine whether or not it is advisable and under what
conditions.
RECOMMENDATION
Retaining the existing coterminous SOI is recommended for RD 2090.
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
Table 13-4: RD 2090 SOI Analysis
Issue Comments
SOI update Retain existing coterminous SOI.
recommendation
Services provided Maintenance services to non-project levees and internal drainage facilities
on Quimby Island.
Present and planned The District bounds encompass primarily agricultural land uses. Crops
land uses in the area grown on the island consist of corn and wheat. Other land uses within the
District include farm buildings, a primary residence and a caretaker
residence.
Location of facilities, Levees protected by the District are located around the perimeter of
infrastructure and Quimby Island. The main internal drainage ditch runs in a westerly
natural features direction with dual pumping stations located along Sheep Slough. Minor
internal drainage ditches are oriented perpendicular to the main ditch.
Projected growth in the There is no growth projected within the District/SOI.
District/Recommended
SOI
176 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2090 (QUIMBY ISLAND)
Present and probable There is a present and probable need for levee and drainage maintenance
need for public facilities services on the island as long as the island is used for productive
and services in the area agricultural purposes.
Opportunity for infill No SOI expansion is recommended and no development is projected on
development rather than the island.
SOI expansion
Service capacity and The MSR identified financing as the major constraint to levee maintenance
adequacy and rehabilitation efforts. The District participates in the DWR
subventions program to assist with levee rehabilitation costs.
Social or economic The economic community of interest is Ellis Island Farms, Inc., the sole
communities of interest landowner on Quimby Island.
Effects on other Retaining the existing coterminous SOI would have no effect on other
agencies agencies.
Potential for Should RD 2090 no longer be able to provide services, dissolution of RD
consolidations or other 2090 and annexation to an adjacent reclamation district would be a
reorganizations when possibility.
boundaries divide
communities
Willingness to serve The District has demonstrated a willingness to serve by providing levee
maintenance services to Quimby Island since 1918.
Potential effects on Retaining the existing coterminous SOI would allow the District to
agricultural and open continue to serve its boundary area, which is comprised of agricultural
space lands land.
Potential environmental Although no potential environmental impacts were identified in the MSR,
impacts the LAFCO counsel and planner should make CEQA determinations.
BY BURR CONSULTING 177
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
14. R E C L A M AT I O N D I S T R I C T 2 1 1 7
( C O N E Y I S L A N D )
Reclamation District 2117 (Coney Island) provides maintenance services to non-project levees
and internal drainage facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2117 was formed on August 10, 1983 as an independent special
district.247 The District was formed to “improve and maintain levee, drainage and irrigation systems
within affected territory.”248
The principal act that governs the District is the Reclamation District Act.249 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,250 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,251 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,252 and 4) retain an agricultural
expert to advise landowners.253 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.254
The District’s boundary is located entirely within Contra Costa County. RD 2117 is a Delta
island located in the most southeasterly portion of Contra Costa County, adjacent to Clifton Court
Forebay on the west and San Joaquin County on the east, as shown on Map 14-1. The boundaries
encompass 935 acres (approximately 1.5 square miles). Contra Costa is the principal county and
247 LAFCO Resolution No. 83-15.
248 LAFCO Executive Officer’s Report dated August 5, 1983, attached to LAFCO Resolution No. 83-15.
249 California Water Code, Division 15, §50000-53903.
250 California Water Code §50932.
251 California Water Code §50910.
252 California Water Code §50933.
253 California Water Code §50952.
254 Government Code §56824.10.
178 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2117 (CONEY ISLAND)
Contra Costa LAFCO has jurisdiction. The District is within the Primary Zone of the Sacramento-
San Joaquin Delta and is outside the countywide urban limit line (ULL).
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries. 255
Boundary History
LAFCO records indicate that there have been no boundary changes for RD 2117 since
formation.
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a three-member Board of Trustees, of which one seat is vacant.
Upon request of the District, Board members are appointed to staggered four-year terms by the
County Board of Supervisors. Board members are not compensated by RD 2117.
Table 14-1: RD 2117 Governing Body
Reclamation District 2117 Coney Island
Governing Body
Name Position Began Serving Term Expires
Herbert Speckman Trustee 1983 2011
Members
Joyce Speckman Trustee 1983 2011
Vacant
Landowner elections. Board member must be a landowner or legal
Manner of Selection representative of a landowner within the District. For uncontested
elections, appointments are made by the County Board of Supervisors.
Length of Term Four years
Meetings Date: As needed Location: 235 E. Weber Ave., Stockton, CA 95202
Agenda Distribution As requested
Minutes Distribution As requested
Contact
Contact Secretary and Counsel
Mailing Address Nomellini, Grilli & McDaniel P.O. Box 1461 Stockton, CA 95201
Email/Website ngmplcs@pacbell.net/No website
Because the District is under a single ownership, it not considered necessary to conduct
constituent outreach activities. Any customer complaints can be brought to the attention of the
Board. The District reported that no complaints were received in FY 07-08. The Board meets at
least annually, and more frequently if required. Board agendas are posted at the District Secretary’s
office window.
255 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
BY BURR CONSULTING 179
Map 14-1 R D 2117 Boundary and Coterminous SOI
O
ld
R
Ú[ iv e
r
------------------------------
Clifton Court Rd
Coney Island
Clifton W
e
Court s
t
Forebay C
a
n
a
l
r
e
v
Ri
d
Ol
Reclamation District
Levees
City Boundaries
Ú[
Pumping Stations
County Boundary
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.125 0.25 0.5 Miles
County of Contra Costa disclaimer of liability for geographic information.
RECLAMATION DISTRICT 2117 (CONEY ISLAND)
The District demonstrated full accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
LAFCO map inquiries and document requests.
SERVICE DEMAND AND GROWTH
Access to RD 2117 is via Clifton Court Road and Tracy Boulevard in San Joaquin County. A
bridge connects the adjacent Union Island at the end of Clifton Court Road to Coney Island. (Refer
to Map 14-1.)
The District bounds encompass agricultural activities with farm buildings, a primary residence
and caretaker residence. The primary crops are row crops and alfalfa. The State Farmland Mapping
and Monitoring Program classifies agricultural land in the District as Prime Farmland (approximately
720 acres) and Farmland of Statewide Importance (180 acres). All of the land within the District is
under Williamson Act Contract.
The interests of the landowner Coney Island Farms, Inc., and its principals Herbert and Joyce
Speckman, are considered to be the customer base for the District. The resident population is four.
The District’s population density is 2.6 persons per square mile, compared to a countywide density
of 1,318, according to the 2000 Census. The area has not experienced any growth, and changes in
service demand in the future are not anticipated.
MANAGEMENT
The District employs no full-time or part-time staff positions. Maintenance activities are carried
out by employees of Coney Island Farms, and by contract. The District contracts for legal and
engineering services.
The landowners/trustees are responsible for levee patrol and monitoring. The District does not
have a formal levee inspection procedure and does not keep written inspection reports. The
department of Water Resources (DWR) conducts yearly inspections of work performed under the
subventions and special projects programs, but does not conduct overall levee inspections or
certification.
The District does not adopt an annual budget. A financial report by an independent auditor is
prepared each year. The most recent audited financial statement provided to LAFCO by the
District was for FY 07-08. The District did not have an updated capital improvement plan in place
as of the drafting of this report.
FINANCING
The District’s financial ability to provide services is contingent upon the willingness of the
landowner to participate in District operations, and from reimbursements from the State
subventions program. For FY 06-07, the landowner provided $50,000 in assessment fees, while in
FY 07-08, no assessments were levied. In FY 07-08, the District relied on State assistance monies of
$44,840.
BY BURR CONSULTING 181
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
District expenditures fluctuate year to year as financing relies on DWR subventions funding for
levee maintenance activities. Expenditures were higher in FY 05-06 than in subsequent years due to
significant maintenance activities performed that year, including placing rock rip-rap along the Old
River Segment. To a lesser extent, levee maintenance needs and efforts also fluctuate somewhat
from year to year. For example, the District did not perform any significant maintenance activities
in FY 04-05 and FY 06-07. Revenue fluctuations have generally followed the expenditure trend,
with higher intergovernmental revenues in FY 05-06 than subsequent years due to a greater volume
of reimbursable projects that year.
Figure 14-1: RD 2117 Expenditures, FY 04-05 through FY 07-08
For FY 06-07, the District expended
$70,000
$9,914 on general operations, while in FY
$60,000
07-08 a total of $34,561 was spent for levee
maintenance. Identified levee repairs and $50,000
rehabilitation are carried out under the
$40,000
direction of the Trustees and the District
Engineer. The District spent approximately $30,000
$6,400 on maintenance costs per levee mile
$20,000
in FY 07-08, compared to a countywide
median level of $9,900 per levee mile. $10,000
$0
The District has not adopted
FY 04-05 FY 05-06 FY 06-07 FY 07-08
development requirements, and does not
receive development impact fees, because
no development has taken place on the island.
Financial details are provided in Table 14-2.
The District utilizes a ‘cash receipts and disbursement’ basis of accounting. Under this method,
revenues are recognized when received and expenditures are recorded when paid. The District does
not have any long-term debt. As of June 30, 2008, the District had a cash balance of $55,329, which
is on deposit with the Contra Costa County Treasurer.
182 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2117 (CONEY ISLAND)
Table 14-2: RD 2117 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
Reclamation services are financed primarily by assessments and DWR subventions, depending on the year.
Development Fees and Requirements
Agricultural (per acre) None
Residential (per unit) Single Family: None Multi-Family: None
Non-residential (per 1,000 sq. ft.)Commercial: None Industrial: None
Development Requirements: None
RD 2117 Audited Financial Statements
Revenues FY 06-07 FY 07-08 Expenditures FY 06-07 FY 07-08
Total $50,000 $44,830 Total $9,914 $36,786
Property Tax $0 $0 Operations $9,914 $34,561
Assessments $50,000 $0 Drainage & Utilities1 $0 $0
Intergovernmental Revenues $0 $44,830 Levee Maintenance2 $0 $34,561
Levee Maintenance $0 $44,830 Capital Improvements3 $0 $0
Capital Improvements $0 $0 Administrative4 $0 $0
Development Impact Fees $0 $0 Professional Fees5 $0 $2,225
Interest $0 $0 Insurance⁶ $0 $0
Other Revenues $0 $0 Miscellaneous⁷ $0 $0
Notes:
(1) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(2) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance expenditures are those
that are necessary to maintain the levee to its existing standard of protection.
(3) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement expenditures are
those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing a cross-section, engineering
studies, etc.).
(4) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and trustee fees.
(5) Legal and accounting services.
(6) The District is covered by insurance from policies held by the landowner.
(7) Miscellaneous expenditures.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2117 provides levee maintenance and internal drainage services through the auspices of
Coney Island Farms. The District contracts with Coney Island Farms, Inc. for vegetation removal,
weed abatement and vector/rodent control, and upkeep of access roads as part of the levee
maintenance work. The District is responsible for flood fighting and levee patrol during high water
events.
BY BURR CONSULTING 183
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
LOCATION
RD 2117 provides services within its boundary area, and to levees around the perimeter of
Coney Island. The District does not provide any services outside of Coney Island. A series of
drainage channels convey water to the north end of the island for pumping into Old River. Riparian
habitat areas along Old River are outside the levee system but within the District boundary. (Refer
to Map 14-1.)
The MSR did not identify documented benefits of continued reclamation of the tracts for
sustaining the fresh water/saltwater balance and health of the Delta, as the area is not identified as a
critical asset by California Water Code §12311. Hence, the benefit area for the District’s reclamation
activities are confined to the District’s boundary area.
INFRASTRUCTURE
Key infrastructure in the District includes 5.4 miles of non-project levees, as well as one pump
station. Levees are constructed out of earthen material, and are rated by the District Engineer as
being in good condition, and meeting Hazard Mitigation Plan (HMP) Standards.256
Figure 14-2: RD 2117 Old River Levee
According to DWR, there have been no levee
failures on Coney Island in the 1967-2004
periods.257 Likewise, no levee failures or breaches
have occurred in the past four years.258 The island is
located within Flood Zone A27, with a base flood
elevation of eight feet above sea level. The ground
elevation for the interior of the island averages nine
feet below sea level. In other words, the entire
island would be covered by an average of 17 feet of
water in a 100-year flood event. Coney Island is
classified by FEMA as being within a 100-year
floodplain.
Coney Island contains limited amounts of
organic material (peat soils) ranging in depth from zero to 10 feet. Historically, these areas have
experienced minimal subsidence without any consequences.259
The District reported that it plans to rehabilitate all levees to PL 84-99 standards as funds
become available, over the next ten years. The highest priority levees for rehabilitation are the West
Canal segment, along the west side of the island.
256 Interview with Christopher Neudeck, District Engineer on March 18, 2009.
257 DWR & DFG, Risks and Options to Reduce Risks to Fisheries and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008.
258 Interview with Christopher Neudeck, District Engineer on March 18, 2009.
259 Ibid.
184 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2117 (CONEY ISLAND)
Table 14-3: RD 2117 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Contract Weed Abatement Contract
Flood Control Contract Slope Protection Contract
Drainage Contract Vector/Rodent Control Contract
Upkeep of Levee Access Roads Contract Levee Patrol Direct & Contract
Irrigation Water None Flood Fighting Direct & Contract
District Overview
Total Levee Miles 5.4 Surface Elevation -9 ft. (average)
Levee Miles by Standard Levee Miles by Type
No Standard 0.0 Dry Land Levee 0
HMP Standard 5.4 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 5.4
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) Yes -1
Detention Basin(s) No Bridges Yes -1
Floodplain
FIRM Designation A27 Base Flood Elevation 8-ft. above sea level
Levee Inspection Practices
Landowners/Trustees almost daily; District Engineer periodically.
Levee Inspection Reports
Most Recent Written Inspection NP¹ Inspection Rating NP
Levee Segment Description Condition
Old River Along the north, east and south side of island Good
West Canal Along the west side of island Good
Levee Maintenance
Miles Rehabilitated, FY 07-08 0.0 Miles Needing Rehabilitation 0.0
Percent Rehabilitated 0% Percent Needing Rehabilitation 0%
Rehabilitation Cost per Levee Mile² NA Maintenance Cost per Levee Mile³ $6,400
Infrastructure Needs/Deficiencies
Attempting to reach PL 84-99 Standards as funds become available. Slowly upgrading West Canal levee.
Notes:
(1) NP = Not Provided
(2) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number
of levee miles rehabilitated in FY 07-08.
(3) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 185
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
As a single-owner reclamation district, the continued functioning of the District is a direct
consequence of the landowner’s participation in the District, both functionally and monetarily.
Should Coney Island Farms, Inc. and the Speckman family sell the island, responsibility for RD 2117
would fall to the successor landowner. Should the levees fail, re-construction would be a decision of
the landowner.
One option, should RD 2117 fail, would be to annex the territory to the adjacent RD 1 and 2
(Union Island), which operates as a single reclamation district and is located in San Joaquin County.
However, this would only be feasible if the State were to fund levee repair, as it would not be in the
interests of RD 1 and 2 to do so.
Without the reclamation district, Coney Island could still operate as a private enterprise, with
protection of the reclaimed lands the responsibility of the landowner. This scenario would be based
on the value of the crops produced and the economic viability of the island.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The residential population within the district was four individuals, according to the District.
There has been no recent growth within the District, and no growth is anticipated in the
future as the District is entirely agricultural, and outside of the countywide urban limit line
(ULL).
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
2) All levees within the District currently meet HMP standards.
3) The District reported that it plans to rehabilitate all levees to PL 84-99 standards as funds
become available, over the next 10 years.
4) All levee rehabilitation projects are performed by contract. The District has no staff
positions, and routine levee maintenance activities are performed by employees of Coney
Island Farms, the sole landowner within the District.
5) The District provides minimally adequate service given financial and staffing constraints.
The District spent approximately $6,400 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
6) The District reported that the most significant service challenge is obtaining funding for
needed maintenance and rehabilitation activities, and adequate levee standards would not be
possible without DWR funding.
186 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2117 (CONEY ISLAND)
7) The District did not have an updated capital improvement plan in place as of the drafting of
this report.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
8) The District has demonstrated the financial ability to provide minimally adequate service.
9) Funds are insufficient for the agency to provide full-time staffing.
10) The District reported that the current level of financing is generally not sufficient for
adequate service provision, and major maintenance and rehabilitation activities are only
possible with DWR funding.
11) The District should consider updating its assessment, which was adopted in 1983 upon
District formation. A capital improvement plan would allow the District to anticipate the
required assessment amount over a several year period.
12) The District has not adopted development requirements, and does not receive development
impact fees, because no development has taken place on the island.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
13) Efficiencies are gained by collaboration and facility sharing efforts with Coney Island Farms
for the use of equipment and staff for levee maintenance activities.
14) Coordination between Coney Island Farms and RD 2117 is enhanced by the President of
Coney Island Farms serving as Trustee on the RD 2117 Board.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
15) Accountability to local landowners is achieved by having a close working relationship with
Coney Island Farms, the sole landowner. Current RD Board members are also owners of
Coney Island Farms.
16) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
AGENCY PROPOSAL
The agency reported a desire to retain its existing coterminous SOI.
BY BURR CONSULTING 187
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
SOI OPTIONS
Given the considerations addressed in this Municipal Service Review, two SOI options were
identified:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
SOI Option #2 – Adopt a zero SOI for RD 2117 and expand the SOI of an adjacent
reclamation district
Expanding the SOI of RD 1 and 2 in San Joaquin County to include Coney Island and adopting
a zero SOI for RD 2117 would signify that consolidation could be initiated. If initiated, the LAFCO
with jurisdiction (San Joaquin LAFCO) would evaluate consolidation in greater depth and determine
whether or not it is advisable and under what conditions.
RECOMMENDATION
Retaining the existing coterminous SOI is recommended for RD 2117.
Table 14-4: RD 2117 SOI Analysis
Issue Comments
SOI update Retain existing coterminous SOI.
recommendation
Services provided Maintenance services to non-project levees and internal drainage facilities
on Coney Island.
Present and planned The District bounds encompass primarily agricultural land uses. Crops
land uses in the area grown on the island consist of row crops and alfalfa. Other land uses
within the District include farm buildings, a primary residence and a
caretaker residence.
Location of facilities, Levees protected by the District are located around the perimeter of
infrastructure and Coney Island. The main internal drainage ditch runs in a northwest to
natural features southeast direction down the center of the District, with the single
pumping station located at the northwest end. Minor internal drainage
ditches are oriented perpendicular to the main ditch.
Projected growth in the There is no growth projected within the District/SOI.
District/Recommended
SOI
Present and probable There is a present and probable need for levee and drainage maintenance
need for public facilities services on the island as long as the island is used for productive
and services in the area agricultural purposes.
188 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2117 (CONEY ISLAND)
Opportunity for infill No SOI expansion is recommended and no development is projected on
development rather the island.
than SOI expansion
Service capacity and The MSR identified financing as the major constraint to levee
adequacy maintenance and rehabilitation efforts. The District participates in the
DWR subventions program to offset levee maintenance costs.
Social or economic The economic community of interest is Coney Island Farms, the sole
communities of interest landowner on Coney Island.
Effects on other Retaining the existing coterminous SOI would have no effect on other
agencies agencies.
Potential for Should RD 2117 no longer be able to provide services, dissolution of RD
consolidations or other 2090 and annexation the adjacent reclamation district would be a
reorganizations when possibility.
boundaries divide
communities
Willingness to serve The District has demonstrated a willingness to serve by providing levee
maintenance services to Coney Island since 1983.
Potential effects on Retaining the existing coterminous SOI would allow the District to
agricultural and open continue to serve its boundary area, which is comprised of agricultural
space lands land.
Potential environmental Although no potential environmental impacts were identified in the MSR,
impacts the LAFCO counsel and planner should make CEQA determinations.
BY BURR CONSULTING 189
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
15. R E C L A M AT I O N D I S T R I C T 2 1 2 1
( B I X L E R T R AC T )
Reclamation District 2121 (Bixler Tract) is a family-run operation that provides maintenance
services to non-project levees and internal drainage facilities.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2121 was formed on April 11, 1984 as an independent special
district.260 The District was formed to “improve and maintain levee, drainage and irrigation systems
within affected territory.”261
The principal act that governs the District is the Reclamation District Act.262 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,263 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,264 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,265 and 4) retain an agricultural
expert to advise landowners.266 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.267
260 LAFCO Resolution No. 84-7.
261 LAFCO Executive Officer’s Report dated April 6, 1984, attached to LAFCO Resolution No. 84-7.
262 California Water Code, Division 15, §50000-53903.
263 California Water Code §50932.
264 California Water Code §50910.
265 California Water Code §50933.
266 California Water Code §50952.
267 Government Code §56824.10.
190 PREPARED FOR CONTRA COSTA LAFCO
Map 15-1 D Boundary and Coterminous SOI
R 2121
Reclamation District
Levees Veale Tract
City Boundaries
Ú[
Pumping Stations
Dead Dog Slough
Ú[
t
L n u
e C
gl
a r
E e
g
d
Bixler Tract
e
r
D
r
e
n
r
e
W
Orwood and Palm Tracts
BN & SF Railroad
F a Orwood Rd
llm
a
n
R
d d
R
r
e
l
x
i
B
DDiissccoovveerryy BBaayy
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.125 0.25 0.5 Miles
County of Contra Costa disclaimer of liability for geographic information.
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The District’s boundary is located entirely within Contra Costa County. RD 2121 is located
along the westerly edge of the Delta, approximately three miles east of the City of Brentwood, as
shown in Map 15-1. The boundaries encompass 584 acres (approximately 0.9 square miles). Contra
Costa is the principal county and Contra Costa LAFCO has jurisdiction. The District is within the
Primary Zone of the Sacramento-San Joaquin Delta, and is outside of the countywide urban limit
line (ULL).
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries. 268
Boundary History
LAFCO records indicate that there have been no boundary changes for RD 2121 since
formation in 1984.
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a three-member board consisting of members of the Bloomfield
family. Board members are appointed by the landowner, Bixler-Bloomfield Incorporated, to
indeterminate terms. There have not been any elections conducted since district formation in 1984.
Board Member Tom Bloomfield also serves as the District Manager.
District Trustees meet on an ‘as needed’ basis, and meet at the residence of the General Manager
at 2030 Newton Drive in Brentwood, CA. The District does not contract for legal or engineering
services. The General Manager considers RD 2121 to be an ‘inactive’ district.269
RD 2121 does not file annual reports with the State Controller’s Office, does not maintain any
funds with the Contra Costa County Treasurer, and does not contribute to the operating costs of
LAFCO.
268 LAFCO Resolution dated July 11, 1984, adopting spheres of influence (SOIs) for reclamation districts within Contra Costa
County.
269 Tom Bloomfield, General Manager; personal communication.
192 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2121 (BIXLER TRACT)
Table 15-1: RD 2121 Governing Body
Reclamation District 2121 Bixler
Governing Body
Name Position Began Serving Term Expires
Tom Bloomfield Member 1984 Indefinite
Members
Jack Bloomfield Member 1984 Indefinite
Carol Bloomfield Member 1984 Indefinite
Manner of Selection Landowner appointment
Length of Term Indefinite
Date: As needed Location: 2030 Newton Drive
Meetings
Brentwood, CA 94513
Agenda Distribution Internally to Board Members
Minutes Distribution Internally to Board Members
Contact
Contact General Manager
Mailing Address 2030 Newton Drive, Brentwood, CA 94513
Email/Website None
The District does not conduct outreach activities. In as much as the District is a family-run
operation, there is no need for constituent outreach activities. With regard to customer service, any
complaints are considered by the Board. The District reported that no complaints were received in
FY 07-08.
The District demonstrated partial accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s interview requests and responded to some
document requests. The agency did not provide information on infrastructure needs or District
financial records.
SERVICE DEMAND AND GROWTH
Access to the District is via Orwood Road westerly from the Byron Highway and Delta Road in
Brentwood, or via Bixler Road and SR 4 from the south. Entry to the Bixler Tract is from Orwood
Road just west of its intersection with Bixler Road. Caution is required when crossing the
Burlington Northern and Santa Fe rail line onto the property. The embankment for the rail line is
the southern boundary for the District, and serves as a flood barrier to District lands. Private,
graveled service roads provide perimeter access around the tract, and private agricultural service
roads provide access to the interior. (Refer to Map 15-1)
The District bounds encompass agricultural activities with farm headquarter buildings consisting
of offices, repair shop, farm worker housing, and alfalfa storage structures. On site crops include
pinot grigio and chardonnay grapes (60 acres), alfalfa (240 acres), and pasture (200 acres) for cattle
grazing. The remaining acreage is fallow and provides habitat for birds and animals. The State
Farmland Mapping and Monitoring Program classifies agricultural land in the District as Prime
Farmland (approximately 250 acres) and Farmland of Statewide Importance (30 acres), Unique
Farmland (60 acres), and Farmland of Local Importance (230 acres). There is no Williamson Act
contracted land within the District.
The District considers its customer base to be the Bloomfield family. There are five resident
farm workers in the District, who are employees of the landowner. The District’s population
BY BURR CONSULTING 193
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
density is five persons per square mile, compared with the 2008 countywide density of 1,318. Bixler
Tract has not experienced any growth, and the District does not anticipate changes in service
demand in the future. The District is outside the countywide urban limit line (ULL) and expects
agriculture to be the predominant land use for the foreseeable future. Development pressure,
should it occur, is most likely to come from expansion of the Discovery Bay community.270
The District is not a land use authority, and does not hold primary responsibility for
implementing growth strategies. The District does monitor development activity in the vicinity, but
does not always receive application referrals from other agencies, most recently the Knightsen
School District’s Old River Elementary School campus on Bixler Road.
MANAGEMENT
The District does not have any employees. Maintenance activities are carried out by employees
of the Bloomfield family and Bloomfield Vineyards.
Members of the Bloomfield family and the operator of the cattle pasture are responsible for
levee patrol and monitoring. The District does not have a formal levee inspection procedure and
does not keep written inspection reports.
The District reported that it does not prepare financial statements, nor does it adopt an annual
budget. The District did not provide financial statements to LAFCO, although it did report that the
landowner reimbursed approximately $5,000 in District expenses for FY 07-08. No formal
assessments have been levied or fees charged to the landowner. Financial information is provided in
Table 15-2.
The District did not identify any planning efforts in which it participates.
FINANCING
The District’s financial ability to provide services is constrained because no revenues are
generated by the District. Any costs incurred by the District are simply billed to the landowner, the
Bixler-Bloomfield Corporation, and are paid through individual invoices. The Corporation’s ability
to finance services is unknown, although it paid approximately $5,000 in FY 07-08 for District levee
maintenance costs.
Fluctuations in the District’s revenues over time could not be determined due to a lack of
historical financial information, and the fact that the District has not filed such information with the
State Controller.
The District has not incurred any long-term debt.271
270 Tom Bloomfield, General Manager; personal communication.
271 Ibid.
194 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2121 (BIXLER TRACT)
The District’s reserves could not be identified. Through the landowner, the District is in the
process of establishing a reserve account in the amount of $25,000 funded by the landowner. 272
Table 15-2: RD 2121 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
Reclamation services are financed by the landowner through direct billings from the District.
Development Fees and Requirements
Agricultural (per acre) None
Residential (per unit) Single Family: None Multi-Family: None
Non-residential (per 1,000 sq. ft.)Commercial: None Industrial: None
Development Requirements: None
RD 2121 Financial Information
Revenues FY 06-07 FY 07-08 Expenditures FY 06-07 FY 07-08
Total NP¹ $5,000 Total NP $5,000
Property Tax NP 0 Operations NP 5,000
Assessments NP 0 Drainage & Utilities² NP 0
Intergovernmental Revenues NP 0 Levee Maintenance³ NP 5,000
Levee Maintenance NP 0 Capital Improvements⁴ NP 0
Capital Improvements NP 0 Administrative⁵ NP 0
Development Impact Fees NP 0 Professional Fees⁶ NP 0
Interest NP 0 Insurance NP 0
Other Revenues NP 5,000 Miscellaneous⁷ NP 0
Notes:
(1) Not Provided
(2) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(3) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(3) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(4) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(5) Legal and accounting services.
(6) Miscellaneous expenditures.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2121 provides levee maintenance and internal drainage services. Vegetation removal, weed
abatement, vector/rodent control, and upkeep of access roads are accomplished as part of the on-
272 Tom Bloomfield, District Manager; personal communication.
BY BURR CONSULTING 195
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
site farming operations. The District is also responsible for flood fighting and levee patrol during
high water events. Some limited levee reconstruction activities were required after the high water
event of 1997-98 when the Werner Dredger Cut levee segment was damaged.
LOCATION
RD 2121 is located in the far westerly portion of the Delta, but is still within the Primary Zone.
The ground elevation varies from 14 feet above sea level in the southwest corner to two feet below
sea level in the northeast corner.
The MSR did not identify documented benefits of continued reclamation of the tracts for
sustaining the fresh water/saltwater balance and health of the Delta, as the area is not identified as a
critical asset by California Water Code §12311. Hence, the benefit area for the District’s reclamation
activities are confined to the District’s boundary area.
INFRASTRUCTURE
Key infrastructure in the District includes approximately one mile of levee on the north side
along Dead Dog Slough, and one mile of levee on the east side along Werner Dredger Cut. (Refer
to Map 15-1.) Levees are constructed out of earthen material with concrete rubble and some rip-rap
on the water side, but do not meet any particular standard. The westerly boundary of the District is
of sufficient elevation that no levee is required. A major drainage course runs north-south along this
side and empties into Dead Dog Slough. The south boundary is protected by the elevated
Burlington Northern and Santa Fe rail line.
Figure 15-1: RD 2121 Werner Dredger Cut Levee
Approximately two-thirds of the District is
within the 100-year flood zone (Zone A2 with a
base flood elevation of 7-feet above sea level).
This will result in partial flooding of the District
during a 100-year event, and possible damage to
the Werner Dredger Cut and Dead Dog Slough
levee segments as occurred in 1997-98. However,
due to the configuration of the ground elevation
behind the levees, flood damage is not expected to
be significant.273
Subsidence is not an issue for Bixler Tract, as
primarily clay-type soils are present.
The ground configuration has been established so that the tract drains by gravity from southwest
to northeast. A pump station is located in the northeast corner of the tract at the confluence of
Dead Dog Slough and Werner Dredger Cut.
273 Tom Bloomfield, District Manager; personal communication.
196 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2121 (BIXLER TRACT)
The levees are not maintained to HMP standards. The District did not provide information on
infrastructure needs.
A summary of services, facilities and conditions is provided in Table 15-3.
Table 15-3: RD 2121 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Contract Weed Abatement Contract
Flood Control Direct & Contract Slope Protection Contract
Drainage Contract Vector/Rodent Control Contract
Upkeep of Levee Access Roads Contract Levee Patrol Direct & Contract
Irrigation Water None Flood Fighting Direct & Contract
District Overview
Total Levee Miles 2.0 Surface Elevation -2 to 14 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 2.0 Dry Land Levee 0.0
HMP Standard 0.0 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 2.0
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) Yes - 1
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A2 and C Base Flood Elevation 7 feet above sea level
Levee Inspection Practices
Levee inspections are performed on a regular basis by the District Manager and the pasture leasee.
Levee Inspection Reports
Most Recent Written Inspection None Inspection Rating NP¹
Levee Segment Description Condition
Dead Dog Slough Low level levee; primarily earth construction Fair²
Werner Dredger Cut Earthen construction with some rock rip rap Fair²
Levee Maintenance
Miles Rehabilitated, FY 06-07 0.0 Miles Needing Rehabilitation NP
% Rehabilitated 0% % Needing Rehabilitation NP
Rehabilitation Cost per Levee Mile 0 Maintenance Cost per Levee Mile $2,500
Infrastructure Needs/Deficiencies
Improvements to the levees are made as fill dirt becomes available.
Notes:
(1) Not Provided
(2) Source: field observation.
BY BURR CONSULTING 197
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
Three governance alternatives have been identified for the District: 1) consolidate with RD
2024; 2) consolidate with RD 2065; or 3) dissolution.
Dissolution is an option for the District. The District does not participate in the State levee
subvention program to finance levee maintenance or rehabilitation activities.274 The landowner did
not identify any strategic value of reclaiming its lands with respect to impact on the Delta. The State
did not have records on this particular district. The District does not file financial statements with
the State Controller. The District Manager reported that the District is inactive. It does not appear
that the landowner considers the District to be a needed public agency, and appears that the District
could be dissolved and the levee maintenance responsibilities be formally made the responsibility of
the landowner, or assigned to the countywide Flood Control and Water Conservation District.
Hence, dissolution appears to be a feasible policy option.
Consolidation with the adjacent RD 2024 (Orwood and Palm Tracts) is an option. If
consolidated, RD 2024 would be the logical successor agency, as it has completed extensive
rehabilitation of its levees and is in sound financial condition. Given the lack of financial record-
keeping and documented maintenance activities, there are no apparent benefits to RD 2024 of
consolidating or accepting unknown liabilities for RD 2121. Hence, this option appears infeasible.
Consolidating with the adjacent RD 2065 (Veale Tract) is an option. However, RD 2065 is not
in a good financial position and has a very high landowner assessment. The authors did not identify
any incentives for the Bloomfield family to accept liability for Veale Tract levees with an increase in
assessments levels. There are no apparent benefits to RD 2121 for consolidating with RD 2065 that
would justify the time and expense of processing a consolidation. Hence, this option appears
infeasible.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) The 2008 residential population within the district was five. There has been no recent
growth.
2) There are no planned and proposed developments located within the existing boundary and
SOI of the District.
274 Tom Bloomfield, District Manager; personal communication.
198 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2121 (BIXLER TRACT)
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
3) Levees currently do not meet any standard, and have the potential to be damaged if flooding
occurs.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
4) The current level of financing is dependent on the funding commitment of the landowner.
The landowner’s ability to finance services is unknown, although it does pay approximately
$5,000 annually for levee maintenance services.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
5) The District is not involved in any facility sharing.
6) Opportunities for future facility sharing would be dependent on consolidation with another
reclamation district.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
7) As a single family landowner, the District does not conduct any community outreach or
involvement activities.
8) The District demonstrated partial accountability and transparency by disclosing available
information in response to LAFCO requests. The agency did not provide information on
infrastructure needs or District financial records.
9) Governance options include dissolution and consolidation with one of two neighboring
reclamation districts.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
AGENCY PROPOSAL
The District did not indicate a preference with respect to its SOI.
SOI OPTIONS
Given the considerations addressed in the Municipal Service Review, four options are identified
for the RD 2121 SOI:
BY BURR CONSULTING 199
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue operating within its
existing SOI.
SOI Option #2 – Consolidate with RD 2024
Consolidating with the adjacent RD 2024 (Orwood and Palm Tracts) is a possibility. However,
RD 2024 has completed extensive rehabilitation of its levees and is in sound financial condition.
One benefit for RD 2024 would be to fill its Trustee vacancy with a representative from the
dissolving District.
SOI Option #3 – Consolidate with RD 2065
Consolidating with the adjacent RD 2065 (Veale Tract) is a possibility. However, RD 2065 is
not in a good financial position and has a very high landowner assessment. The Bloomfield family
would probably find this option cost prohibitive.
SOI Option #4 – Adopt a ‘Zero’ SOI
If LAFCO determines that the existing government structure is not functioning in an acceptable
manner, the Commission could adopt a Zero SOI for RD 2121. This would be the first step in
dissolving the District.
RECOMMENDATION
Adopting a Zero SOI is recommended for RD 2121 as it is not presently functioning as a public
agency and is not fulfilling all of its corporate powers pursuant to Government Code Section 56871.
There was no indication provided by the District as to why it should continue to exist.
Table 15-4: RD 2121 SOI Analysis
Issue Comments
SOI update Adopt a Zero SOI.
recommendation
Services provided Contracted maintenance services to non-project levees and internal
drainage facilities on Bixler Tract.
Present and planned Agriculture. The District is in the Delta Primary Zone and outside the
land uses in the area County ULL.
Location of facilities, Levees protected by the District are located on the east side adjacent to
infrastructure and Werner Dredger Cut, and the north side adjacent to Dead Dog Slough.
natural features
Projected growth in the There is no growth projected within the District/SOI.
District/Recommended
SOI
200 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2121 (BIXLER TRACT)
Present and probable There is a present need for levee and drainage maintenance services on
need for public facilities the tract. The integrity of these levees can be enhanced by adding fill
and services in the area material to the land side, thereby reducing pressure on the levees.
Opportunity for infill No SOI expansion is feasible and no development is projected on the
development rather than island.
SOI expansion
Service capacity and The District operates at a very basic level, and relies on the single
adequacy landowner to operate and maintain District facilities.
Social or economic The economic community of interest is the Bloomfield family, as the
communities of interest only landowner on Bixler Tract.
Effects on other Adopting a Zero SOI would have no effect on other agencies.
agencies
Potential for Two consolidation options were identified. Each is less than viable for
consolidations or other differing reasons.
reorganizations when
boundaries divide
communities
Willingness to serve As a family operated reclamation district, RD 2121’s willingness to serve
is an internal family matter. The degree of participation could not be
determined.
Potential effects on No potential effect on existing agricultural operations is anticipated, even
agricultural and open if the reclamation district goes out of business.
space lands
Potential environmental Although no potential environmental impacts were identified in the
impacts MSR, the LAFCO counsel and planner should assist the Commission in
making CEQA determinations.
BY BURR CONSULTING 201
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
16. R E C L A M AT I O N D I S T R I C T 2 1 2 2
( W I N T E R I S L A N D )
Reclamation District 2122 (Winter Island) provides maintenance services to non-project levees
and tidal gates used to obtain water levels necessary to maintain the island wetlands.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2122 was formed by LAFCO on August 8, 1984 as an independent
special district.275 The District was formed to “maintain, protect and repair existing levees and other
reclamation works to benefit affected territory.”276
The principal act that governs the District is the Reclamation District Act.277 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,278 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,279 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,280 and 4) retain an agricultural
expert to advise landowners.281 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.282
The District’s boundary is located entirely within Contra Costa County. RD 2122 is a Delta
island located northeast of Browns Island and the City of Pittsburg, as shown on Map 16-1. The
boundaries encompass 422 acres, or approximately 0.7 square miles. Contra Costa is the principal
county and Contra Costa LAFCO has jurisdiction. The District is within the Primary Zone of the
Sacramento-San Joaquin Delta, and is outside of the countywide urban limit line (ULL).
275 LAFCO Resolution No. 84-28.
276 LAFCO Executive Officer’s Report dated August 3, 1984, attached to LAFCO Resolution No. 84-28.
277 California Water Code, Division 15, §50000-53903.
278 California Water Code §50932.
279 California Water Code §50910.
280 California Water Code §50933.
281 California Water Code §50952.
282 Government Code §56824.10.
202 PREPARED FOR CONTRA COSTA LAFCO
!
(
!
(
D Boundary and Coterminous SOI R 2122
Reclamation District
Levees
City Boundaries
!
B
r
o
a
d
S
l
o
u
g
h
M
id
d
le
S
lo
u Winter Island
g
h
S
PPiittttssbbuurrgg
J o
a q
a n
R
iv
e
u in
r
New
York
Slough
E 3rd
St
E 3rd
St
R d e e k AAnnttiioocchh
d Cr
Pittsburg
St
R
ail r
o a
Kir k
er
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.125 0.25 0.5 Miles
County of Contra Costa disclaimer of liability for geographic information.
(
Map 16-1
Flood Gates
County Boundary
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The existing SOI for the District was adopted by LAFCO in 1984 and is coterminous with
District boundaries. 283
Boundary History
LAFCO records indicate that there have been no boundary changes for RD 2122 since
formation.
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by a four-member board. Board members are elected on an annual
basis (at the September Board meeting) by the eight partners of Winter Island Farms, the single
property owner within the District. Although the principal act requires a three-, five- or seven-
member board elected to staggered four-year terms, the District reported that it was re-chartered to
allow for a four-member board serving annual terms.284 The District reported that the four-member
board is able to make decisions, and offer the accountability desired by the partners. The District
meets twice per year, in April and September. RD 2122 board members serve on a volunteer basis
and do not receive compensation.
Table 16-1: RD 2122 Governing Body
Reclamation District 2122 (Winter Island)
Governing Body
Name Position Began Serving Term Expires
Robert Calone President 1986 2009
Members Hugh Corum Secretary 2000 2009
Scott OHara Vice President 2007 2009
Larry Zwakenberg Trustee 2007 2009
Manner of Selection Elected at September meeting by partners of Winter Island Farms.
Length of Term One year
Date: Semiannually, in April Location: Winter Island
Meetings
and September
Agenda Distribution By request, and posted on bulletin board at Winter Island.
Minutes Distribution By request
Contact
Contact District President
Mailing Address NA
Email/Website NA
The District’s constituent outreach activities consist of emailing, mailing and posting notices on
Winter Island. Because Winter Island Farms is the sole landowner complaints are rare. The District
reported that no complaints were received in FY 07-08. Complaints would typically be made to the
President of the Board directly, or at a semiannual Board meeting. All eight partners of Winter
283 LAFCO Resolution No. 84-28, dated August 8, 1984.
284 California Water Code §50600-50602.
204 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2122 (WINTER ISLAND)
Island Farms typically attend board meetings and are in regular contact, so constituent outreach and
involvement is high.
The District demonstrated partial accountability in its disclosure of information and cooperation
with LAFCO. The agency responded to LAFCO’s written questionnaires and cooperated with
interview and document requests; however, the District failed to provide an audited financial
statement for FY 06-07.
SERVICE DEMAND AND GROWTH
The District bounds encompass recreational land uses and natural wetlands. Winter Island is
comprised of approximately 400 acres of freshwater marsh, 15 acres of open water and scattered
ponds, two acres of riparian habitat, and 33 acres of open sandy soils and upland vegetation.285
Winter Island serves as a wildlife habitat to at least 13 species of waterfowl and other birds, and
mammal species such as the black-tailed jackrabbit, California ground squirrel, pocket gophers, river
otter, beaver, muskrat, striped skunk, and raccoon.286 The entire island is classified as marshland by
the California Department of Conservation, and there is no Williamson Act contracted land within
the District. 287
There is no business activity on the island except for that conducted by Winter Island Farms, a
private duck hunting club. The District is only accessible by boat, and there is no ferry service to the
island.
The District considers its customer base to be Winter Island Farms, the sole landowner. There
is no permanent residential population in the District. The area has not experienced significant
recent growth, and does not anticipate changes in service demand in the future. There are no
planned or proposed developments on the island. The District is not a land use authority, and does
not hold primary responsibility for implementing growth strategies.
The District reported that it was looking into providing vector (mosquito) control service on the
island, but had not yet begun providing this service as of March 2009. Mosquito control is not an
authorized service under the reclamation district principal act; however, the District may request
services from the Contra Costa County Mosquito and Vector Control District for services on the
island.288
MANAGEMENT
The District employs no full-time or part-time staff positions. Routine levee maintenance
activities are performed by RD 2122 board members directly. The District contracts out for major
285 San Francisco Bay RWQCB, Order No. 01-061, p. 2.
286 Ibid.
287 California Department of Conservation Division of Land Resource Protection, Contra Costa County Important Farmland 2006,
Farmland Mapping and Monitoring Program, 2007.
288 Services can be requested via the CCMVCD website, at http://www.ccmvcd.dst.ca.us/request.htm
BY BURR CONSULTING 205
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
services, including levee rehabilitation projects, engineering services and legal counsel. The District
conducts evaluations of contractor performance as work is completed. Equipment used for routine
levee maintenance is rented from Winter Island Farms.
Levees are inspected once per month during the dry season, by driving along the top of the
levees, and by boat during the rainy season. Levees are inspected more often during duck season,
from October to January, when there is more activity on the island. The District does not maintain
written inspection reports. Oversight and review of levee maintenance activities is supplemented by
the Department of Water Resources (DWR) inspections of work performed under the subventions
program.289
The District reported that it annually prepares audited financial statements, but does not adopt
an annual budget. The most recent audited financial statement provided to LAFCO by the District
was for FY 07-08.
The District engineer reported that RD 2122 does not have a current five-year levee
improvement plan in place, but anticipates to have one completed by November 2009.
FINANCING
The District reported that its financial ability to provide services is constrained by a lack of
revenues, and provides minimally adequate service to portions of the District. District levees do not
meet minimum standards (HMP) along the eastern and western segments of the island.
Figure 16-1: RD 2122 Expenditures, FY 04-05 through FY 07-08
District expenditures fluctuate year to
$120,000
year as major capital needs are occasional
rather than regular, ongoing expenses. $100,000
Expenditures were higher in FY 04-05 than
$80,000
in subsequent years due to increased
maintenance activities performed that year.
$60,000
To a lesser extent levee maintenance needs
and efforts also fluctuate somewhat from $40,000
year to year. Somewhat less maintenance
$20,000
occurred in FY 06-07 than in FY 05-06 and
FY 07-08, resulting in somewhat lower
$0
expenditures in FY 06-07 than usual.
FY 04-05 FY 05-06 FY 06-07 FY 07-08
Revenue fluctuations have generally
followed the expenditure trend, with higher intergovernmental revenues in FY 04-05 than
subsequent years due to a greater volume of reimbursable capital projects that year.
The District received nearly $34,600 in revenues in FY 07-08. In FY 07-08, RD 2122 relied
primarily on intergovernmental revenues to fund services. Intergovernmental revenues (in the form
289 DWR performs inspections of work funded through the subventions program, but does not conduct overall levee inspections or
certification.
206 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2122 (WINTER ISLAND)
of DWR subventions payments) generated 46 percent of operating revenues, and 44 percent of
revenues were derived from tipping fees for earthen material deposited on the island, which the
District reported is not a usual income source. Interest income generated 10 percent of revenues in
FY 07-08. The District did not levy assessments in FY 07-08, and reported that there is no standard
assessment amount. The assessment amount is determined on an annual basis, with the single
property owner (Winter Island Farms) assessed based on the anticipated maintenance needs for the
year. All capital improvements on the levee system occur through DWR special projects funding.
Total expenditures for FY 07-08 were approximately $51,700, 80 percent of which were for
levee maintenance activities and four percent for permits and fees. Other expenditures for the
District consisted of professional fees (six percent of expenditures) and administrative costs (two
percent). The District spent approximately $8,200 on maintenance per levee mile in FY 07-08,
compared to a median level of $9,900 among all reclamation districts. Expenditures in excess of
revenues in FY 07-08 were funded by the District’s reserves carried over from the prior fiscal year.
The District had no long-term debt at the end of FY 07-08. The District does not have a formal
policy on maintaining financial reserves. The District had an unreserved, undesignated fund balance
of $86,800 at the close of FY 07-08. In other words, RD 2122 maintained 20 months of working
reserves.
BY BURR CONSULTING 207
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Table 16-2: RD 2122 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
In FY 07-08, reclamation services were financed primarily by DWR subventions funds (46%) and other
sources (44%).
Development Fees and Requirements
Agricultural (per acre) NA
Residential (per unit) Single Family: NA Multi-Family: NA
Non-residential (per 1,000 sq. ft.)Commercial: NA Industrial: NA
Development Requirements: NA
RD 2122 Audited Financial Statements
Revenues FY 06-071 FY 07-08 Expenditures FY 06-071 FY 07-08
Total $33,212 $34,583 Total $43,190 $51,684
Property Tax $0 $0 Operations NP $43,394
Assessments $0 $0 Drainage & Utilities3 NP $2,189
Intergovernmental Revenues $21,338 $15,904 Levee Maintenance4 NP $41,205
Levee Maintenance $21,338 $15,904 Capital Improvements5 NP $0
Capital Improvements $0 $0
Administrative6
NP $779
Development Impact Fees $0 $0 Professional Fees7 NP $3,200
Interest $3,134 $3,479 Insurance NP $4,247
Other Revenues2 $8,740 $15,200 Miscellaneous NP $64
Note:
(1) FY 06-07 financial information comes from the California State Controller's Special Districts Annual Report.
(2) Other revenues in FY 07-08 include tipping fees for materials brought to the island.
(3) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(4) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(5) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(6) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(7) Legal and accounting services.
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2122 provides maintenance services to non-project levees and tidal gates used to obtain
water levels necessary to maintain the island wetlands. The District conducts routine levee
maintenance activities directly, and relies on contract labor for major rehabilitation projects. The
District is also responsible for flood fighting and levee patrol during high water events.
LOCATION
RD 2122 provides services within its boundary area, the entirety of Winter Island. The District
does not provide services outside of its Winter Island levees.
208 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2122 (WINTER ISLAND)
INFRASTRUCTURE
Key infrastructure in the District includes five miles of earthen levees and two tidal gates.290 The
District reports that three and a half miles of levees meet the Hazard Mitigation Plan (HMP)
standard (one foot above the 100-year floodplain), and the remaining one and a half miles of levees
do not meet the HMP standard. 291 Levees not meeting HMP standard are primarily located along
the eastern boundary of the District.
According to DWR, there have been no inundation occurrences on Winter Island since 1900.292
The District reported that the most recent levee failure occurred in 2004. The surface of Winter
Island ranges from sea level to between five and ten feet above sea level.293 The entire island is
within the 100-year floodplain.
The most significant levee infrastructure need is to rehabilitate the portion of the levee that
failed in 2004. RD 2122 had obtained permits from the Department of Fish and Game and the San
Francisco Bay Regional Water Quality Control Board to perform the needed rehabilitation, but as of
December 2008 was still trying to get the needed permit from the U.S. Army Corps of Engineers.
The District plans to repair the levee breach by constructing a setback levee parallel to the failed
section. The setback levee would consist of three salvaged steel barges sunk on a prepared
foundation, filled with imported dredge material over a period of five years. The setback levee
would tie into the existing levee, and the repair area would be about 400 feet long by 24 feet wide.
Two of the three barges have already been put in place (but not submerged) without the Corps
authorization.294 The District reported that it plans to complete the levee repair by the end of 2009.
The District reported that subsidence has occurred on some levee segments, especially in the
northwest of the District and the southeast of the District, and addressing this is an ongoing need.
Other significant infrastructure needs relate to rehabilitating the one and a half miles of levees in
order to meet the HMP standard.
290 Many of the island’s original levees were constructed from 1895-7 by the Brotherhood of Winters Island, a socialist cooperative
group that tried to establish the island as a farming colony.
291 For a detailed explanation of levee standards and specifications, please refer to chapter 4.
292 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 7.
293 Ibid., p. 6.
294 U.S. Army Corps of Engineers San Francisco District, Winter Island Levee Repair Project Public Notice, December 15, 2006.
BY BURR CONSULTING 209
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Figure 16-2: RD 2122 Middle Slough Levee
210 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2122 (WINTER ISLAND)
Table 16-3: RD 2122 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Direct Weed Abatement Direct
Flood Control Direct Slope Protection Direct
Drainage Direct Vector/Rodent Control By Contract
Upkeep of Levee Access Roads Direct Levee Patrol Direct
Irrigation Water None Flood Fighting Direct
District Overview
Total Levee Miles 5.0 Surface Elevation 0 to 10 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 1.5 Dry Land Levee 0.0
HMP Standard 3.5 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 5.0
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System No Flood Gates Yes - 2
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A2 Base Flood Elevation 7 ft.
Levee Inspection Practices
Levees are inspected once per month during the dry season and more often during duck season (from
October to January). The District does not create written levee inspection reports.
Levee Inspection Reports
Most Recent Written Inspection NA Inspection Rating NA
Levee Segment Description Condition
Sacramento River Northern District boundary 0.5 mi. at HMP
Middle Slough Western District boundary 2 mi. at HMP, 0.3 mi. <HMP
New York Slough Southern District boundary 0.4 mi. at HMP
Broad Slough Eastern District Boundary 0.6 mi. at HMP, 1.2 mi. <HMP
Levee Maintenance
Miles Rehabilitated, FY 07-08 0.0 Miles Needing Rehabilitation 1.5
% Rehabilitated, FY 07-08 0% % Needing Rehabilitation 30%
Rehabilitation Cost per Levee Mile1 NA Maintenance Cost per Levee Mile2 $8,241
Infrastructure Needs/Deficiencies
The District identified repairing the 2004 levee breach by the end of 2009 as a priority. Other infrastructure
needs include rehabilitation of over one and a half miles of levees that do not meet HMP standards.
Notes:
(1) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number of
miles rehabilitated in FY 07-08.
(2) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 211
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
The MSR did not identify any new governance alternatives for RD 2122. Because of its remote
location in the western portion of the Delta, there are no neighboring reclamation districts and
consolidation does not appear to be a feasible option.295 In general, Winter Island is not compatible
with other reclamation districts in the County, because the island is maintained as a wetland that is
owned by a private duck club and the landowner directly conducts maintenance activities with their
own labor.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) There is no residential population on Winter Island, according to the 2000 Census and the
District, and no plans for any future population growth on the island. The island is visited
by duck club members and their guests for recreation purposes.
2) Winter Island provides important habitat for at least 13 bird species and eight known
mammal species.
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
3) Three and a half miles of levees currently meet HMP standards, but do not provide 100-year
flood protection. One and a half miles of levees do not meet HMP standards and require
significant rehabilitation.
4) Repairing the site of the 2004 levee failure is a need for the District. The District had a plan
in place to repair the levee, but had not received all of the necessary permits to begin the
work, as of December 2008. The District identified having the levee breach repaired by the
end of 2009 as a goal.
5) All routine maintenance activities are performed directly by District board members, if
necessary, using equipment owned by Winter Island Farm. The District is billed by Winter
Island Farms for rental of the equipment. Major levee improvements or rehabilitation
projects are performed by contract.
295 Although Winter Island is located just east of Browns Island, no opportunities for collaboration are evident. Browns Island is
owned and operated by the East Bay Regional Park District and has no flood control or drainage facilities on the island. Because
Browns Island has a surface elevation ranging from five to 10 feet above sea level, levees are not necessary to withhold flood waters.
212 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2122 (WINTER ISLAND)
6) The District provides minimally adequate service due to significant financial and staffing
constraints. The District spent approximately $8,200 on maintenance per levee mile in FY
07-08, compared to a median level of $9,900 among all reclamation districts.
7) The most significant service challenge is providing adequate services given limited financing
and no paid staff.
8) Infrastructure needs for the district include rehabilitation of levee segments to meet HMP
standards, and repairing the site of the 2004 levee failure.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
9) The District reported that its financial ability to provide services is constrained by a lack of
revenues, and the District is only able to provide minimally adequate service to portions of
the District. District levees do not meet minimum standards along the eastern and western
segments of the island, and significant capital improvements will only be possible with State
funding.
10) The District reported that maintaining adequate services levels is contingent upon continued
participation in the DWR subventions program.
11) Funds are insufficient for the agency to provide paid staffing.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
12) The Agency does not practice significant facility sharing, and no opportunities for shared
facilities were identified.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
13) Accountability to local landowners is achieved by the District having a close working
relationship with Winter Island Farms, the primary landowner. Members of the RD 2122
governing body are also partners of Winter Island Farms.
14) The District demonstrated accountability and transparency by disclosing financial and
service related information in response to LAFCO requests, but did not provide audited
financial statements for FY 06-07.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 1984, and updated most recently in 2004.
AGENCY PROPOSAL
The agency reported a desire to retain its existing coterminous SOI.
BY BURR CONSULTING 213
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
SOI OPTIONS
Given the considerations addressed in the Municipal Service Review, the only SOI option
identified for RD 2122 is to retain the existing coterminous SOI.
RECOMMENDATION
Retaining the existing coterminous SOI is recommended for RD 2122.
Table 16-4: RD 2122 SOI Analysis
Issue Comments
SOI update Retain existing coterminous SOI.
recommendation
Services provided Maintenance services to non-project levees and flood gates on Winter
Island.
Present and planned The District bounds encompass recreational land uses and natural
land uses in the area wetlands. The County General Plan land use designation for Winter Island
is agricultural. The sole landowner within the District is Winter Island
Farms, a private duck club.
Location of facilities, Levees protected by the District are located around the perimeter of
infrastructure and Winter Island. Flood gates are located at the northern and southern ends
natural features of the island.
Projected growth in the There is no growth projected within the District/SOI.
District/Recommended
SOI
Present and probable There is a present and probable need for levee maintenance services on the
need for public facilities island, as the levee system is over 100 years old and there are significant
and services in the area rehabilitation needs.
Opportunity for infill No SOI expansion is recommended and no development is projected on
development rather than the island.
SOI expansion
Service capacity and The MSR identified financing as the major constraint to levee maintenance
adequacy and rehabilitation efforts.
Social or economic The economic community of interest is Winter Island Farms, as it is the
communities of interest sole landowner on Winter Island.
Effects on other Retaining the existing coterminous SOI would have no effect on other
agencies agencies.
Potential for No potential consolidation opportunities were identified. The remote
consolidations or other location of the District and its unique status as a wetland (owned by a
reorganizations when private duck club) make it a bad fit for consolidation.
boundaries divide
communities
Willingness to serve The District has demonstrated a willingness to serve by providing levee
maintenance to Winter Island since 1984.
214 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2122 (WINTER ISLAND)
Potential effects on Retaining the existing coterminous SOI would allow the District to
agricultural and open continue to serve its boundary area, which is comprised of freshwater
space lands marsh and ponds, riparian habitat, and upland vegetation.
Potential environmental Although no potential environmental impacts were identified in the MSR,
impacts the LAFCO counsel and planner should make CEQA determinations.
BY BURR CONSULTING 215
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
17. R E C L A M AT I O N D I S T R I C T 2 1 3 7
Reclamation District 2137 provides maintenance services to non-project levees and internal
drainage facilities, and oversees habitat preservation/restoration.
AGENCY OVERVIEW
FORMATION AND BOUNDARY
Reclamation District (RD) 2137 was formed on July 9, 2003 as an independent special district.296
The District was formed to “assume the maintenance of existing levees surrounding the proposed
new district.”297
The principal act that governs the District is the Reclamation District Act.298 The principal act
empowers RDs to 1) construct, maintain and operate levees, pumping plants, canals, and other
diversion and irrigation infrastructure,299 2) acquire, maintain and operate irrigation systems (dams,
diversion works, canals, pumps) and supply irrigation water to lands within and contiguous to
district bounds,300 3) construct, maintain, and operate transportation (i.e., roads, bridges, and ferry
boats) for access to district facilities and land in the district bounds,301 and 4) retain an agricultural
expert to advise landowners.302 Districts must apply and obtain LAFCO approval to exercise latent
powers, that is, those services authorized by the principal act but not provided by the district by the
end of 2000.303
296 LAFCO Resolution No. 03-10.
297 LAFCO Executive Officer’s Report dated July 2, 2003, attached to Resolution No. 03-10.
298 California Water Code, Division 15, §50000-53903.
299 California Water Code §50932.
300 California Water Code §50910.
301 California Water Code §50933.
302 California Water Code §50952.
303 Government Code §56824.10.
216 PREPARED FOR CONTRA COSTA LAFCO
Map 17-1 RD Boundary and Coterminous SOI
2137
Reclamation District
Levees
2137 Maintained J
e
rs
Flood Control Maintained e
y
Is
City Boundaries Jersey Island la
n
d
R
d
Big
Break
Dutch Slough
h
g
u
o h
e k l g
e S u
r o
C n l
h o S R d
s s d
a r r h a n
M e c I sl
m u t s e y
E
D J
er
e
l Hotchkiss
t
Monet Dr i t Tract
L
C
o
n
OOaakklleeyy tra
e C
v o s
A ta
· s C a
e r n a l
ell
S
E Cypress Rd
n
n n e
L s
M
a
c h a d o
ell
e r s A v
e
F
r
a n k li n
L
K n i g h
t
A v
e
S KKnniigghhttsseenn
®
This map was created by the Contra Costa County Community
65 b 1 y P C i o n n e t r S a tr C e o e s t, t 3 a 4 7 t C : h 5 o 9 F M u : l 4 n o a 8 t o p y . r 4 c C N 5 r o e 5 o m a N rt t h m e 1 d W u 2 n 5 2 i i n / t 1 : y 0 g 8 6 , D / M 2 :3 e 0 5 a v 0 . r e 3 9 t l i o 8 n p 4 e m z W , e C n A t, 9 G 4 IS 55 G 3- r 0 o 0 u 9 p 5 a b T re a h a s D i s s e i e t . s m v d W e a c a l u t p o h a r p , r i c l e m e p o n r n e o i t m t n b a s t l a t i i n a g D r s t i a e l e y t c p e i o f C a d p t r i h t t t y y o m e r i L e u g s i n s h o m e t t u e i w t r t d s c h i , e t i i h s n i s i f s d d o d a a r c e m t t i a a r te i a v f t d t h e r i . o o d e U m n C f s r a o t e o h n m r u e d s n t C m o t h y f o e a a t n y h C s t i r s n s A a u o m m C t S a b t o e a p e s s t t e a a a n g l B o t C e r o e r o r a e e e u r s d d n t p o . t o y o I r n f t e G s E m a I ib q S d a i u l y a i P a t n y b r li d o e z f g o a a r r r t e c i a o i p c t m s n e r o ' . p a s d S t c t u a o t c h c u x m e e r r e a d a c i t y n e . 0 0.125 0.25 0.5 Miles
County of Contra Costa disclaimer of liability for geographic information.
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The District’s boundary is located entirely within Contra Costa County. RD 2137 is primarily
within the boundaries of the City of Oakley, and is located north of the Contra Costa Water District
canal between Little Dutch Slough on the east and Marsh Creek on the west, as shown on Map 17-1.
The boundaries encompass 785 acres, or approximately 1.2 square miles. Contra Costa is the
principal county and Contra Costa LAFCO has jurisdiction. The District is within the Secondary
Zone of the Sacramento-San Joaquin Delta, and is within the countywide urban limit line (ULL).
The existing SOI for the District was adopted by LAFCO in 2003 and is coterminous with
District boundaries. 304
Boundary History
LAFCO records indicate that there have been no boundary changes for RD 2137 since
formation in 2003.
LOCAL ACCOUNTABILITY AND GOVERNANCE
The District is governed by an elected three-member board serving four year terms. Two Board
members are the designated representatives of the State Department of Water Resources (DWR) as
the major landowner within the District. The third Trustee is a landowner appointed by the County
Board of Supervisors. Board members do not receive a stipend for attending meetings.
Table 17-1: RD 2137 Governing Body
Reclamation District 2137
Governing Body
Name Position Began Serving Term Expires
Brent Gilbert Trustee 2005 2011
Members
Patricia Quickert Trustee 2008 2009
Edward Schmit Chairman 2007 2009
Board members must be a landowner or legal representative of a landowner. For
Manner of Selection uncontested elections, appointments are made by the County Board of
Supervisors upon nomination by the District.
Length of Term Four years
Date: As needed Location: District office or within District
Meetings
(Approximately 6 per year) 311 E. Main Street, Suite 504 Stockton, CA
Agenda Distribution To all trustees and landowners; by mail if requested; posted at District office.
Minutes Distribution To all trustees and landowners; by mail if requested.
Contact
Contact District Secretary and Legal Counsel
Mailing Address 311 East Main Street Suite 504, Stockton, CA 95202
Email/Website ahoslett@sbcglobal.net/No website
The District conducts most of its constituent outreach activities in conjunction with the Dutch
Slough Restoration Committee, a multi-agency forum for developing the Dutch Slough Tidal Marsh
304 LAFCO Resolution No. 03-10.
218 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2137
Restoration Project. Board member Quickert is also the Project Director for the Slough Restoration
Project, as well as a Staff Environmental Scientist at DWR.
With regard to customer service, complaints may be filed with the District Secretary for
consideration by the Board. Within FY 07-08 there were no complaints filed.
The District did not complete the initial Request for Information questionnaire. The agency
responded to LAFCO’s inquiries and cooperated with LAFCO in answering questions and
providing information.
SERVICE DEMAND AND GROWTH
Access to the District is via E. Cypress Road from Main Street (State Highway 4) in Oakley.
Vehicle access is limited, however pedestrian access is provided via the Marsh Creek Trail on the
west side of the District at E. Cypress Road and Main Street. Limited access is available from the
north end of Sellers Avenue.
The District bounds encompass primarily pasture, fallow ground, and open space/habitat area.
The State Farmland Mapping and Monitoring Program classifies agricultural land in the District as
Prime Farmland (approximately 380 acres), Farmland of Statewide Importance (140 acres), Unique
Farmland (70 acres), and Farmland of Local Importance (100 acres). There are no Williamson Act
contracted lands within the District.
District lands make up a majority of the Dutch Slough Restoration Project site, which was
purchased by DWR in 2003. The project site consists of 1,666 acres along with a 55-acre
community park site which will be acquired by the City of Oakley. There are three major parcels
within the restoration area – the 438-acre Emerson property, the 292-acre Gilbert property (both of
which are in RD 2137), and the 436-acre Burroughs property (which is in the adjacent RD 799).
District Trustee Brent Gilbert currently is a landowner within the District and leases back land
from DWR for oats, irrigated pasture and cattle grazing. Long-term plans call for the restoration
and preservation of the three properties as open space, habitat, and recreational uses. One
alternative allows breaching of the existing levees to establish water features within the preserve.
Any consideration to reduce flood protection in the Dutch Slough Restoration area will need to
address protection of urban development proposed as part of the City of Oakley’s East Cypress
Corridor Specific Plan.
The District considers its customer base to be the lands within the District. DWR is working
with the Restoration Committee and the City of Oakley in developing an overall plan and
implementation strategy. The current population of the District is only two, a caretaker family to
oversee the property.
The District is primarily within the City of Oakley with the exception of a levee segment along
Dutch Slough. (Refer to Map 17-1) The City has jurisdiction over land use and applicable City
codes and standards. The City General Plan designates the District property as ‘Delta Recreation’
and ‘Parks and Recreation.’ The 55-acre community park site is currently undergoing conceptual
design.
BY BURR CONSULTING 219
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
MANAGEMENT
The District does not have any staff. Engineering and legal services are provided by contract.
Repair and maintenance activities are contracted out.
The District does not have a formal levee inspection procedure, and does not keep written
inspection reports. Levee patrol duties are performed through contract with engineering firms.
The District adopts an annual budget and contracts for an annual independent audit. The most
recent audited financial statement provided to LAFCO by the District was for FY 07-08.
FINANCING
The District has demonstrated the financial ability to provide minimally adequate service to the
District’s levees. The District’s financial ability to provide services is constrained by available
revenues, State subventions, and grant funding. During the past two fiscal years, funds were
allocated to levee maintenance and rehabilitation. The District utilizes the ‘cash receipts and
disbursement’ basis of accounting, in which revenues are recognized when received and
expenditures are recorded when paid. Details for FY 06-07 and FY 07-08 are provided in Table 17-
2.
Figure 17-1: RD 2137 Expenditures, FY 04-05 through FY 07-08
District expenditures fluctuate from
$350,000
year to year, depending on the projects
undertaken by the District in a particular $300,000
year. For FY 07-08, expenditures were
$250,000
increased significantly to take advantage of
$200,000
the economies of a larger project. This
allowed the District to complete a HMP $150,000
project at the south end of Emerson
$100,000
Slough.
$50,000
The District received $131,623 in NR
$0
revenues in FY 06-07 and $191,881 in FY
FY 04-05 FY 05-06 FY 06-07 FY 07-08
07-08. RD 2037 relies primarily on
landowner assessments to fund District
functions. An assessment of approximately $170 per acre is levied, which is the same as when the
District was formed in 2003. The District does not receive any property tax revenue. It is the
practice of the District to cancel the delinquent assessments on lands belonging to the Emerson
family and the Gilbert Trust (whose trustee Brent Gilbert is also a District Trustee). Prior to the
District being formed, there was an agreement and understanding between the two landowners and
DWR that these two landowners would not be responsible for the payment of any District
assessments. The amount forgiven has been $2,340 per year.
District revenues fluctuate year to year depending on the availability of subvention funds from
the State. Total expenditures for FY 06-07 were $80,848, with an increase to $315,209 in FY 07-08.
The vast majority of expenditures were for levee repair and maintenance (68 percent over the past
two years), of which engineering services accounted for $110,723 and actual levee maintenance
220 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2137
accounted for $159,250. The District spent approximately $11,200 on maintenance costs per levee
mile in FY 07-08, compared to a countywide median level of $9,900 per levee mile.
The amount that the District spends each year for its administrative expenses and levee and
operational expenses is based on the balance within its general account. This account consists of
annual assessments, reimbursements under the Delta Levee Subventions program, special projects
agreements, balances carried forward from prior years, and other miscellaneous sources.
The District does not have any long-term debt. The District’s cash balance as of June 30, 2008
was $42,169 and is held by the Contra Costa County Treasurer. This balance constituted 13 percent
(or seven weeks) of annual expenditures in FY 07-08.
Table 17-2: RD 2137 Reclamation Service Financing
Reclamation Service Financing
General Financing Approach
Reclamation services are financed primarily by assessments.
Development Fees and Requirements
Agricultural (per acre) None
Residential (per unit) Single Family: None Multi-Family: None
Non-residential (per 1,000 sq. ft.) Commercial: None Industrial: None
Development Requirements: None
RD 2137 Audited Financial Statements
Revenues FY 06-07 FY 07-08 Expenditures FY 06-07 FY 07-08
Total $131,623 $191,881 Total $80,848 $315, 209
Property Tax 0 0 Operations 69,465 291,766
Assessments 131,623 131,623 Drainage & Utilities1 643 90,615
Intergovernmental Revenues 0 0 Levee Maintenance2 68,822 201, 151
Levee Maintenance 0 0 Capital Improvements3 0 0
Capital Improvements 0 0 Administrative4 0 0
Development Impact Fees 0 0 Professional Fees5 7,849 19,310
Interest 0 0 Insurance 3,134 4,133
Other Revenues - Reimbursements 0 60,258 Miscellaneous6 400 0
Notes:
(1) Costs associated with maintaining and operating pump stations and canals, and other permits and fees.
(2) Costs of labor, supplies and engineering work associated with levee maintenance only. Levee maintenance
expenditures are those that are necessary to maintain the levee to its existing standard of protection.
(3) Costs of labor, supplies and engineering work associated with capital improvements only. Capital improvement
expenditures are those that serve to increase the level of protection provided by the levee (e.g., raising the levee, changing
a cross-section, engineering studies, etc.).
(4) Administrative costs include dues and subscriptions, telephone and other office utilities, administrative salaries, and
trustee fees.
(5) Legal and accounting services.
(6) Miscellaneous expenditures include contract services.
BY BURR CONSULTING 221
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
RECLAMATION SERVICE
NATURE AND EXTENT
RD 2137 provides levee maintenance to non-project levees and internal drainage services by
contract. The District contracts for vegetation removal, weed abatement and vector/rodent control.
The District is directly responsible for flood fighting and levee patrol during high water events. The
District is also involved in habitat preservation and marshland restoration.
LOCATION
RD 2137 provides services within its boundary area, and to levees located along Dutch Slough,
Emerson Slough, and Little Dutch Slough. A 1.4 mile segment of levee along Marsh Creek and the
westerly portion of Dutch Slough is maintained by the Contra Costa Flood Control District. (Refer
to Map 17-1)
The MSR did not identify documented benefits of continued reclamation of the tracts for
sustaining the fresh water/saltwater balance and health of the Delta, as the area is not identified as a
critical asset by California Water Code §12311. Hence, the benefit area for the District’s reclamation
activities are confined to the District’s boundary area.
INFRASTRUCTURE
Key infrastructure in the District includes 3.8 miles of levees. Levees are constructed out of
earthen materials, and for the most part meet HMP Standards . Short segments are slightly (2-
inches) lower than the required height. According to the District, levees have not been breached
since the District was formed in 2003.
Ground surface elevations within the District vary from ten feet above sea level along the
southern boundary to ten feet below sea level on the north adjacent to the Dutch Slough levee. The
base flood elevation, which is the anticipated water level in a 100-year flood occurrence is seven feet
above sea level. In other words, nearly the entire tract would be covered by up to 17 feet of water in
a high-water event. Hence, the tract is presently classified by FEMA as being in the 100-year
floodplain.
Subsidence is an issue, as organic soils are still present on the north end of the property.
The primary infrastructure need identified by the District is to raise those levee segments that do
not meet the HMP Standard.
222 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2137
Table 17-3: RD 2137 Reclamation Service Profile
Service Configuration, Facilities and Inspections
Service Provider
Levee Maintenance Contract Weed Abatement Contract
Flood Control Contract Slope Protection Contract
Drainage Contract Vector/Rodent Control Contract
Upkeep of Levee Access Roads Contract Levee Patrol Direct
Irrigation Water None Flood Fighting Direct & Contract
District Overview
Total Levee Miles 3.8 Surface Elevation -10 to 10 ft.
Levee Miles by Standard Levee Miles by Type
No Standard 0.8¹ Dry Land Levee 0
HMP Standard 3.0 Urban Levee 0.0
PL 84-99 Standard 0.0 Agricultural Levee 3.8
Bulletin 192-82 Standard 0.0 Other 0.0
District Facilities
Internal Drainage System Yes Pump Station(s) No
Detention Basin(s) No Bridges No
Floodplain
FIRM Designation A13, A18 Base Flood Elevation 7 ft. above sea level
Levee Inspection Practices
The District contracts with engineering firms for levee patrol duties.
Levee Inspection Reports
Most Recent Written Inspection NP² Inspection Rating NP
Levee Segment Description Condition
Dutch Slough - West Earthen levee with minor deficiencies Good
Emerson Slough - West Side Earthen levee extending to E. Cypress Road Good
Emerson Slough - East Side Earthen levee extending to E. Cypress Road Good
Dutch Slough - East Earthen levee with minor deficiencies Good
Little Dutch Slough - West Side Older earthen levee with some deficiencies Fair
Levee Maintenance
Miles Rehabilitated, FY 07-08 0.9 Miles Needing Rehabilitation 0.8
Percent Rehabilitated 24% Percent Needing Rehabilitation 21%
Rehabilitation Cost per Levee Mile³ $11,200 Maintenance Cost per Levee Mile⁴ $11,200
Infrastructure Needs/Deficiencies
Bring all levee segments up to HMP Standards.
Notes:
(1) Not all levee cross-sections meet the HMP Standard, but vary slightly from the levee height requirement.
(2) NP = Not Provided
(3) Rehabilitation cost per levee mile is equal to the expenditure amount on capital improvements in FY 07-08 divided by the number
of levee miles rehabilitated in FY 07-08.
(4) Maintenance cost per levee mile is equal to the expenditure amount on levee maintenance in FY 07-08 divided by the total number
of levee miles.
BY BURR CONSULTING 223
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
GOVERNANCE ALTERNATIVES
Five governance alternatives have been identified for RD 2137.
Dissolution is an option for the District. District land is owned by DWR and two private
parcels (of which the City of Oakley has an option to acquire). Restoration of the tract as part of the
Dutch Slough Tidal Marsh Restoration Project, along with any necessary new levee construction or
repair and maintenance of existing levees could become the responsibility of the State of California
or the City of Oakley (or both).
Consolidation with the adjacent RD 799 (Hotchkiss Tract) is an option. A 436-acre portion of
the Dutch Slough Tidal Marsh Restoration Project area (Burroughs Parcel) is located within RD 799.
Under this option, RD 2137 would be dissolved and the area annexed to RD 799. This would place
all of the Restoration Project area within a single reclamation district.
A variation of this option would be to detach the Burroughs Parcel from RD 799 and annex that
territory to RD 2137. This option may affect the integrity of the existing levees on Hotchkiss Tract,
and/or require construction of new levees if existing levees are breached for marshland restoration.
Establishment of a subsidiary district is an option. Under this scenario, the City of Oakley
would assume responsibility for reclamation services with the City Council serving as the Board of
Trustees. The SOI for the subsidiary district would need to be coordinated with the City of Oakley
SOI.
Construction of a new ‘set-back’ levee is an option. New urban development along the East
Cypress Corridor could be required to finance a new east-west levee meeting FEMA flood
protection standards. This new levee would in effect, separate and protect the residential and
commercial development in the corridor from the habitat/tidal marsh restoration area closer to
Dutch Slough. The City of Oakley would be responsible for implementing this option.
AGENCY MSR DETERMINATIONS
GROWTH AND POPULATION PROJECTIONS
1) Other than on-site caretakers or employees residing on the property, the District is not
anticipating any population growth.
2) There are no planned and proposed developments located within the existing boundary and
SOI of the District. The area is designated for recreation in the City of Oakley General Plan.
3) The District is within the Secondary Zone of the Delta, and within the countywide urban
limit line (ULL). Given these designations, it is conceivable that development could occur
within District boundaries.
224 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2137
PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE
NEEDS AND DEFICIENCIES
4) All but 0.8 miles of District levees meet HMP standards, and those segments are ‘slightly’
deficient (two-inches below the height standard).
5) Levee rehabilitation work has recently been accomplished at the south end of Emerson
Slough.
6) The District provides minimally adequate service given financial and staffing constraints.
Any improvements to the levee system will require substantial financial backing from DWR.
7) The most significant service challenge is integrating the Dutch Slough Restoration Project
into the existing levee system, and in determining the best way to utilize limited District
resources.
8) The District’s capital improvement plan needs to be programmed to reflect phasing
priorities for the Dutch Slough Restoration Project.
9) The District spent approximately $11,200 on maintenance costs per levee mile in FY 07-08,
compared to a countywide median level of $9,900 per levee mile.
FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
10) The current level of financing allows for minimal maintenance to the existing levee system.
11) Funds are insufficient for the District to provide full or part-time staffing.
12) The property owner assessment is not indexed to account for inflation. The assessment has
remained constant since the District was formed in 2003.
13) The District is paying a disproportionate share of its expenditures on engineering services.
STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
14) By virtue of its location within the City Limits of Oakley and given that the District
landowner is a state agency (DWR), opportunities exist for sharing facilities with both the
City and the State.
15) Opportunities exist for sharing costs and coordinating contract work (levee maintenance,
weed abatement, vector/rodent control) with RD 799 owing to their proximity and the
interrelationship of the levees.
ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
16) Accountability to local voters is constrained by virtue of state ownership of the land.
BY BURR CONSULTING 225
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
17) The District conducts outreach activities and informs the public primarily through the Dutch
Slough Restoration Committee, a multi-agency task force.
18) The District would benefit by having a district manager or someone with day-to-day
responsibilities.
19) The District demonstrated limited accountability and transparency to LAFCO requests.
This is attributed to the lack of a district manager, a lack of interest by the landowner trustee,
and the role of the DWR representatives in a ‘staff’ role as opposed to a ‘trustee’ role.
SOI RECOMMENDATIONS AND DETERMINATIONS
The existing SOI for the district is coterminous with its bounds. The SOI for the district was
adopted by LAFCO in 2003, and updated most recently in 2004.
AGENCY PROPOSAL
The District indicated a desire to retain its existing coterminous SOI.
SOI OPTIONS
Given the considerations addressed in the Municipal Service Review, five options are identified
for the RD 2137 SOI:
SOI Option #1 – Retain existing coterminous SOI
If LAFCO determines that the existing government structure is appropriate, then the existing
SOI should be retained. This option would enable the district to continue to include the areas
within its SOI in its long-term planning.
SOI Option #2 – Adopt a Zero Sphere and dissolve the District
Under this option, the State Department of Water Resources (DWR) would take over the
functions of the District, would finance any improvements, and would implement the Dutch Slough
Restoration Project. Coordination with the City of Oakley would be necessary to insure flood
protection of the urbanized areas along the East Cypress Corridor.
SOI Option #3 – Establish RD 2137 as a Subsidiary District
Under this option, the City of Oakley would assume responsibility for reclamation services with
the City Council serving as the Board of Trustees. The District SOI would need to be coordinated
with the City of Oakley SOI.
SOI Option #4 – Expand the SOI
Expand the District’s SOI to include the Burroughs Parcel and reduce RD 799’s SOI
accordingly. This would place all of the Dutch Slough Restoration Project area within RD 2137’s
SOI, and allow for annexation of the Burroughs Parcel to RD 2137.
226 PREPARED FOR CONTRA COSTA LAFCO
RECLAMATION DISTRICT 2137
SOI Option #5 – Adopt a Zero SOI
Adoption of a ‘zero sphere’ would indicate the future elimination of the District, most likely in
terms of annexing RD 2137 territory to the adjacent RD 799.
RECOMMENDATION
Dissolve the District and allow DWR to take over the functions of the District.
Table 17-4: RD 2137 SOI Analysis
Issue Comments
SOI update Adopt a Zero Sphere as the first step in dissolution.
recommendation
Services provided Levee maintenance, drainage services, habitat restoration, and any other
services necessary to implement the Dutch Slough Tidal Marsh
Restoration Project.
Present and planned Marshland and habitat retention/restoration.
land uses in the area
Location of facilities, Levees necessary to implement the Dutch Slough Tidal Marsh
infrastructure and Restoration Plan.
natural features
Projected growth in the There is no growth projected within the District/SOI.
District/Recommended
SOI
Present and probable There is a present and probable need for levee and drainage maintenance
need for public facilities services in the District. Implementation of the Dutch Slough Tidal
and services in the area Marsh Restoration Project may alter or eliminate the need for such levee
and drainage maintenance services. The Restoration Project may also
trigger a need to develop an urban ‘setback’ levee to protect residential
and commercial development along the East Cypress Corridor.
Opportunity for infill Development is allowed within the existing SOI due to its designation as
development rather than within the Secondary Zone of the Delta and within the countywide ULL.
SOI expansion
Service capacity and Service requirements for the Dutch Slough Tidal Marsh Restoration
adequacy Project may include municipal water supply, sewage disposal, police
protection, fire protection, and recreation services. These would be the
responsibility of the City of Oakley in concert with DWR.
Social or economic The social and economic community of interest is the City of Oakley and
communities of interest the general public who will avail themselves of the various natural
features and aspects of the tidal marsh project.
Effects on other Depending on the final design solution, the tidal marsh project could
agencies have an effect on Contra Costa County, the City of Oakley, Reclamation
District 799, and Reclamation District 830. Contra Costa Water District
could also be impacted by the tidal marsh project. If breaching the levee
and restoring tidal action takes place prior to the Contra Costa Canal
being replaced with a pipeline, water quality in the canal could be
compromised.
BY BURR CONSULTING 227
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
Potential for There is potential to annex RD 2137 to RD 799; or to annex the
consolidations or other Burroughs Parcel to RD 2137 from RD 799.
reorganizations when
boundaries divide
communities
Willingness to serve The State Department of Water Resources should be given the
opportunity to implement and carry out the tidal marsh restoration
project.
Potential effects on Retaining the existing coterminous SOI would allow the District to
agricultural and open continue to serve its boundary area, which currently has limited value for
space lands agriculture but significant value as open space.
Potential environmental Although no potential environmental impacts were identified in the
impacts MSR, the LAFCO counsel and planner should assist the Commission in
making CEQA determinations.
228 PREPARED FOR CONTRA COSTA LAFCO
OTHER PROVIDERS
18. O T H E R P ROV I D E R S
There are agencies that provide levee maintenance services, and provide support to levee
maintenance service providers, that either are not reclamation districts or are not under Contra
Costa LAFCO’s jurisdiction.305 Such agencies play significant roles in service delivery and potentially
affect the SOI and government structure options for local agencies that are subject to LAFCO
regulation.
BETHEL ISLAND MUNICIPAL IMPROVEMENT DISTRICT
NATURE AND EXTENT
The Bethel Island Municipal Improvement District (BIMID) provides levee maintenance and
internal drainage services, maintains and operates a small park and recreation area, and maintains
two roads and various easements for levee access. The District performs routine levee maintenance
services directly, and contracts for major levee rehabilitation. The District is also responsible for
flood fighting and levee patrol during high water events, and reviews of permit applications for
projects that could impact the levee or drainage system. BIMID was formed in 1960, and is the
successor agency to Reclamation District 1619.
BIMID is governed by a five-member board, selected by a district-wide election. The District
meets on a monthly basis, and posts notices and agendas at the District office and at the Bethel
Island Post Office. For additional community outreach, BIMID maintains a website with
information on the District and the island, important news and notifications, board agendas and
minutes, and a quarterly newsletter. BIMID is administered by a part-time District Manager, and
staffed by three full-time, one part-time, and two seasonal maintenance workers.306
LOCATION
BIMID provides services within its approximately 3,500-acre boundary area, the entirety of
Bethel Island. The population of Bethel Island was reported as 2,360 in the 2008 MSR. The MSR
did not report that the District provides any services outside of Bethel Island.
The island has been determined to be critical to the health of the Delta. Bethel Island is one of
the eight western Delta islands that the Department of Water Resources (DWR) has identified as
critical to control of salinity in the Delta, protecting water quality to all water users in the state. The
District provides statewide benefits outside its bounds.307
305 The Bethel Island Municipal Improvement District (BIMID) is under Contra Costa LAFCO’s jurisdiction; however, it was
reviewed in the East County Sub-Regional MSR, adopted by LAFCO in December 2008. A brief profile on BIMID is included in
order to provide comprehensive coverage of levee maintenance services in the County.
306 Contra Costa LAFCO, East County Sub-Regional MSR, 2008, p. VIII-3.
307 Water Code §12311.
BY BURR CONSULTING 229
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
INFRASTRUCTURE
Key infrastructure in the District includes approximately 11.5 miles of earthen (non-project)
levees, as well as “various pump stations, pipelines and canals that are used to collect and dispose of
storm water runoff and seepage water on the island.”308 The District reported to LAFCO that all
levees meet the Hazard Mitigation Plan (HMP) standard. The 2008 MSR for the District did not
report levee condition, but did identify rehabilitating all levees to meet PL 84-99 standards as a long-
term goal.309
Other facilities maintained by the District include the one-acre Bethel Island Park, Dutch Road
and the road to Emerald Point Marina.310 The District also owns a 100-acre site between Bethel
Island Road and Piper Road used for sand borrow for levee maintenance (approximately 85 acres)
and habitat mitigation for replacement of trees removed from the levee (approximately 15 acres).311
According to DWR, there have been four inundation occurrences on Bethel Island since 1900.312
Surface elevations range from sea level in the southwestern portion of the District to an average of
10 feet below sea level in the northwestern and eastern portions of the District.313 Approximately 95
percent of the island is below sea level.314 The base flood elevation, which is the anticipated water
level in a 100-year flood occurrence, is seven feet above mean sea level. In other words, the entire
island would be covered by 7-17 feet of water in a 100-year flood event. Hence, the entire island is
presently classified by FEMA as being within the 100-year floodplain.
Service demand within the District is anticipated to increase over the next 10 years with the
construction of the Delta Coves residential development project. Approved by the County Board of
Supervisors in 1976, the Delta Coves project is a 495-dwelling unit waterfront residential
development. Construction of the development was tied up in litigation for many years, and final
conditions of approval were extended to 2005. By 2006, grading of the site had taken place, and by
2007 many of the lagoons had been filled with water and some boat docks had been installed. In
2008, the levee was intentionally breeched and the remainder of the lagoon was filled. Residential
construction was scheduled to begin later that year, and be completed by 2010. However, as of the
drafting of this report, construction plans have been put on hold due to the downturn in the
housing market. The eventual build-out of the Delta Coves project will add 1,040 new residents to
the District, an increase in population of 44 percent.315
308 Contra Costa LAFCO, East County Sub-Regional MSR, 2008, p. VIII-4.
309 Contra Costa LAFCO, East County Sub-Regional MSR, 2008, p. VIII-5.
310 The road to Emerald Point Marina is maintained jointly by BIMID and landowners along the road.
311 Bethel Island Municipal Improvement District. URL accessed April 2, 2009, http://www.bimid.com/about.html
312 DWR & DFG, Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta, 2008, p. 7.
313 Ibid., p. 6.
314 Contra Costa LAFCO, East County Sub-Regional MSR, 2008, p. VIII-1.
315 Contra Costa LAFCO, East County Sub-Regional MSR, 2008, p. VIII-8.
230 PREPARED FOR CONTRA COSTA LAFCO
OTHER PROVIDERS
Governance Alternatives
A governance alternative for BIMID involves RD 799. RD 799 provides levee maintenance
services to the levees surrounding Hotchkiss Tract, located directly south of Bethel Island. Both
Districts have compatible land uses, including residential, recreational and marina facilities located
along the waterfront at the periphery of the Districts, and agricultural land uses in the central
portion of the Districts. RD 799 reported that it has a good working relationship with BIMID, and
in the past has consulted with BIMID on administrative issues.
Although certain accountability deficiencies were noted in the 2008 BIMID MSR, BIMID
improvements in recent years were also identified in the MSR. While transferring levee maintenance
responsibilities on Bethel Island from BIMID to RD 799 may offer an improvement over existing
levee maintenance services on the island, the BIMID MSR did not identify this as a governance
option and RD 799 has indicated a reluctance towards such a reorganization. Further exploration of
such a governance option should be considered in the next MSR cycle. The residential population
and significant residential development on Bethel Island make it an unsuited match for
consolidation with surrounding primarily agricultural districts, such as RD 2137, RD 830, RD 2065,
and RD 2025.
CONTRA COSTA COUNTY FLOOD CONTROL AND WATER
CONSERVATION DISTRICT
NATURE AND EXTENT
The Contra Costa County Flood Control and Water Conservation District was formed in 1951
by the Contra Costa County Flood Control and Water Conservation District Act as a county-
dependent special district. The District was formed to create drainage areas, flood control zones
and other special assessment areas for the purpose of planning and constructing major storm
drainage facilities within the County.
The District is staffed by the Flood Control Engineering Division of Contra Costa County
Public Works Department. The District designs, builds and maintains flood protection facilities,
and works to protect, restore and enhance the creeks within the County. The District provides
flood risk reduction and planning, reviews land development plans and studies, provides hydrology
information and services, and oversees the Contra Costa Clean Water Program staff.
Funding sources for the District are separate from the unincorporated County drainage and road
drainage funds. A portion of the countywide property tax supports District programs of general
benefit, such as collecting rainfall data, reviewing drainage elements of city and County general plans,
and planning formation of special funding districts for drainage. In addition, the District receives a
portion of property tax within the boundaries of some Flood Control Zones (FCZ) for design,
construction, and maintenance of regional storm drainage facilities within the FCZ. Funding is
enhanced via impact fees charged to development projects within established Drainage Areas (DA),
in order to fund construction of planned drainage facilities required to mitigate increased runoff
BY BURR CONSULTING 231
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
from development, and the District has established special assessments in some DAs to fund
ongoing maintenance of drainage facilities.316
LOCATION
The District covers all of Contra Costa County, including the incorporated cities, and owns
property throughout the County for the purpose of constructing and maintaining regional flood
control channels and creeks. In addition to regional flood protection services, the District also
provides technical information and education to cities and residents throughout the County.
INFRASTRUCTURE
The District’s watershed-based regional flood control projects and facility maintenance
operations are funded through property taxes collected within designated FCZs. The District
operates and maintains 72 miles of flood control channels throughout the County, valued at an
estimated $500 million.317
Table 18-1: Active FCZ in Contra Costa County
There are seven active FCZs in Contra Costa County, Area
with boundaries that coincide with the principal watersheds in Name (sq. mi.)
the County. The Walnut Creek watershed (Zone 3B) is the Zone 1 Marsh Creek 121.3
largest in the County, at nearly 150 square miles, with the Zone 2 Kellogg Creek 62.4
Zone 3B Walnut Creek 147.6
Marsh Creek watershed (Zone 1) ranking second in size at
Zone 6 San Pablo Creek 51.4
over 120 square miles, as shown in Table 18-1. Four FCZ are
Zone 7 Wildcat Creek 10.5
located in west Contra Costa County (Zones 6, 7, 8, and 9),
Zone 8 Rodeo Creek 8.9
one is located in the central portion of the County (Zone 3B)
Zone 9 Pinole Creek 10.8
and two are located in the eastern portion of the County
(Zones 1 and 2).
Flood facilities in Zones 1 and 2 were constructed jointly with the Soil Conservation Service of
the United States Department of Agriculture (now the Natural Resources Conservation Service) in
the 1950s and 1960s, to provide a 50-year level of flood protection. As land uses transitioned from
agriculture to urban uses and communities desired a 100-year level of flood protection, the District
improved flood protection standards by adding new channels and detention basins, and improving
existing flood facilities.
Facilities in Zones 3B, 6, 7, 8 and 9 were constructed jointly with the U.S. Army Corps of
Engineers (Corps) beginning in the early 1950s. The District reported that the agreements with the
Corps require the District to maintain levees to as-built standards. The District reported that the
316 Nearly every watershed in Contra Costa County has been identified with a number, referred to as a Drainage Area (DA). There
are 180 identified DAs in the County, although only 63 had been formed and adopted a plan, as of FY 04-05. DAs are formed to
collect fees from developers to pay for planned drainage infrastructure, including detention basins, pipes, channels, and other
drainage-related costs. Fees are paid to the District directly, or via cities per Fee Collection Agreements. Fees are based on the cost
of the proposed DA improvements and the expected new impervious surface created by build-out of the area.
317 Contra Costa County Flood Control & Water Conservation District Flood Control Expenditure Policy, June 21, 2005, p. 1.
232 PREPARED FOR CONTRA COSTA LAFCO
OTHER PROVIDERS
Corps’ as-built standards are generally not comparable to the current FEMA certification standard;
however, levee heights generally range between 2-3 feet above the 100-year flood level.
Flood control facilities, such as creek channels, detention basins and reservoirs, are contained
within FCZs; however, levees are located in only five of the seven FCZs. The District reported that
it maintains over one mile of levees in Zone 1, approximately seven miles of levees in Zone 3B, over
one mile of levees in Zone 6, approximately one mile of levees in Zone 7, and less than one half
mile of levees in Zone 9.
All levee systems within FCZs are inspected on an annual basis, with the District directly
conducting inspections in Zones 1 and 2, and the U.S. Army Corps of Engineers conducting
inspections on facilities it constructed in Zone 3B, 6, 7, and 9. Unlike levees in the Delta that hold
back water on a year-round basis, District-maintained levees are considered “dry levees,” meaning
they only hold back water during flood events.
The District reported that the most significant service constraint is related to financing. Prior to
the passage of Proposition 13 in 1978, FCZ Advisory Committees recommended tax rates for
review and approval by the District board for each FCZ annually. In FCZs where facilities were
constructed, maintenance was adequate and/or reserves were plentiful, the tax rates (approved by
the District board in the 1975-76 tax year) were set very low or at zero. Upon passage of
Proposition 13, tax rates were frozen at those levels, effectively shutting off the tax revenue needed
to adequately fund maintenance of the flood control facilities. In particular, Zones 6, 7, 8, and 9 are
severely underfunded, and the District is actively seeking ways to compensate for a lack of funding
for maintenance. Deferred maintenance within the District has created a significant backlog of
storm drainage facility repair and restoration needs, estimated at $21 million in FY 04-05.318
Governance Alternatives
Although the Marsh Creek Flood Control Zone (Zone 1) overlaps RD 2065, RD 2121 and a
portion of RD 2137, turning over levee maintenance within these reclamation districts to the County
Flood Control and Water Conservation District does not appear to be a viable option. The District
indicated that it would not be in favor of such a proposal due to the high risk of maintaining Delta
levees, the financing constraints already faced by the District, the fact that there is no clear nexus
between the cost of maintaining RD levees and the benefit to adjacent upland areas in the FCZ, and
the differing purpose of flood control zones (regional flood protection from water originating within
the watershed) and reclamation districts (local flood protection from waters originating outside of
the RD).
DELTA LEVEE COALITION
Contra Costa County, the Contra Costa Council, Contra Costa Water District, East Bay
Municipal Utility District, Bethel Island Municipal Improvement District and Reclamation Districts
799, 830, 2025, 2026, 2059, and 2065 formed the Delta Levee Coalition, with support from the
State’s Delta Protection Commission.
318 Contra Costa County Flood Control & Water Conservation District Flood Control Expenditure Policy, June 21, 2005, p. 1.
BY BURR CONSULTING 233
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
The purpose of the Delta Levee Coalition is to advocate for adequate funds for levee repairs in
the western and central Delta from the Proposition 1E (Disaster Preparedness and Flood Protection
Bond Act of 2006) and Proposition 84 bonds (Water Quality, Safety and Supply, Flood Control,
Natural Resource Protection, Park Improvements Bond).
The Delta Levee Coalition has identified 22 priority projects in the Delta in order to maintain
public health and safety, protect drinking water supply quality, and increase protection of the
numerous natural and economic assets in the Delta. The Delta Levee Coalition estimates that
completion of these 22 projects would cost approximately $317 million over the next five years.319
DELTA PROTECTION COMMISSION
The 1992 Delta Protection Act mandated the designation of primary and secondary zones within
the legal Delta, the creation of a Delta Protection Commission (DPC), and the completion of a Land
Use and Resource Management Plan for the Primary Zone of the Delta. The goal of the DPC is to
ensure orderly, balanced conservation and development of Delta land resources and improved flood
protection.
The 23-member DPC is made up of:
• Landowners from north, south, west, and central Delta reclamation districts;
• A member of the County Board of Supervisors from each of the five Delta counties
(Sacramento, San Joaquin, Contra Costa, Yolo and Solano);
• A representative from the Sacramento Area Council of Governments (SACOG), San
Joaquin Council of Governments (SJCOG), and the Association of Bay Area
Governments (ABAC);
• High level leaders from the California Departments of Fish and Game, Parks and
Recreation, Boating and Waterways, Water Resources, Food and Agriculture, and the
State Lands Commission; and
• Delta residents or landowners in the areas of production agriculture, outdoor recreation,
and wildlife conservation.320
The mission of the DPC is to “adaptively protect, maintain, and where possible, enhance and
restore the overall quality of the Delta environment consistent with the Delta Protection Act and the
Land Use and Resource Management Plan for the Primary Zone.”321 This includes, but is not
limited to, agriculture, wildlife habitat, and recreational activities.
319 Delta Levee Coalition, List of priority projects for use of Proposition 1E and Proposition 84 Funds, 2007.
320 http://www.delta.ca.gov/commission/default.asp
321 http://www.delta.ca.gov/
234 PREPARED FOR CONTRA COSTA LAFCO
OTHER PROVIDERS
The Land Use and Resource Management Plan, originally adopted in February of 1995, outlines
the long-term land use requirements for the Sacramento-San Joaquin Delta. Based on the increased
importance of planning in the Delta, the DPC was in the process of updating the Management Plan
as of the drafting of this report.
OTHER FLOOD AND DRAINAGE PROVIDERS
Other flood and drainage providers within the County include the Discovery Bay Community
Services District (DBCSD), the Discovery Bay Drainage and Maintenance District (DBD&MD) and
the Knightsen Town Community Services District (KCSD).
DBCSD provides construction and operation of flood protection works and facilities within
Discovery Bay West Villages 2, 3 and 4. A MSR and SOI Update for BDCSD were approved by
LAFCO in May 2006.
DBD&MD is a dependent benefit assessment district of RD 800, as the RD 800 governing body
serves as the board for DBD&MD. More detail on the services provided by DBD&MD is provided
in the RD 800 agency profile (Chapter 6) of this MSR document.
KCSD was formed by LAFCO in 2005 to provide flood control and drainage to the
unincorporated community of Knightsen. A MSR and SOI Update for KCSD were approved by
LAFCO in December 2008. As of the adoption of the MSR for KCSD, the agency had yet to begin
providing flood control and drainage services.
BY BURR CONSULTING 235
CONTRA COSTA COUNTY RECLAMATION SERVICES MSR
R E F E R E N C E S
DATA SOURCES
Agency-specific data: responses to LAFCO Requests for Information, budgets, Comprehensive
Annual Financial Reports, Capital Improvement Plans, and miscellaneous plans
Agricultural data: California Department of Conservation
Demographic data: U.S. Bureau of the Census; Department of Finance
Jobs and population projections: Sacramento Area Council of Governments; Department of
Finance,
Revenue: California State Controller; Audited Financial Statements
INTERVIEWS AND CORRESPONDENCE
Agency Name/Title
Contra Costa County Public Works Department Greg Connaughton, Assistant Public Works Director
Contra Costa Water District Mark Seedall, Senior Planner
Department of Water Resources Mike Mirmazaheri, Delta Levee Program Manager
RD 799, Hotchkiss Tract Angelia Tant, District Manager
RD 800, Byron Tract Jeffrey D. Conway, General Manager
Christopher Neudeck, District Engineer
Sonnet Rodriques, Administrative Assistant
RD 830, Jersey Island Dennis Nunn, Trustee
Tom Williams, Trustee
RD 2024, Orwood/Palm Tracts Dante John Nomellini, Sr., Secretary and Legal Counsel
RD 2025, Holland Tract David Forkel, General Manager
RD 2026, Webb Tract David Forkel, General Manager
RD 2059, Bradford Island Angelia Tant, District Manager
RD 2065, Veale Tract Dante John Nomellini, Jr., Secretary and Legal Counsel
RD 2090, Quimby Island Al Warren Hoslett, Secretary and Legal Counsel
Christopher Neudeck, District Engineer
Greg Torlai, Farm Manager
RD 2117, Coney Island Dante John Nomellini, Sr., Secretary and Legal Counsel
Christopher Neudeck, District Engineer
RD 2121, Bixler Tract Tom Bloomfield, General Manager
RD 2122, Winter Island Robert Calone, Trustee
RD 2137 Al Warren Hoslett, Secretary and Legal Counsel
Patricia Quickert, Trustee
U.S. Army Corps of Engineers James Sandner, Chief, Operations & Readiness Branch
236 PREPARED FOR CONTRA COSTA LAFCO