LAFCO
Fortuna MSR Adopted 1 20 21
Read the report at Local Agency Formation Commissions ↗
City of Fortuna
Municipal Services Review and Sphere of
Influence Update
Adopted
January 20, 2021
www.humboldtlafco.org
HUMBOLDT LOCAL AGENCY FORMATION COMMISSION
Commissioners:
Virginia Bass, District 4 Supervisor
Mike Wilson, District 3 Supervisor
Stephen Avis, City of Ferndale
Regular City Member, Vacant
Troy Nicolini, Peninsula Community Services District
Debra Lake, Fruitland Ridge Fire Protection District
Ali O. Lee, Public Member
Alternate Members:
Michelle Bushnell, District 2 Supervisor
Sue Long, City of Fortuna
David Couch, McKinleyville Community Services District
Skip Jorgensen, Public Member
Staff:
Colette Santsche, AICP, Executive Officer
Krystle Heaney, AICP, Clerk/Analyst
Raquel Menanno, Analyst
Jason Barnes, GIS Analyst
Ryan Plotz, Legal Council
Acknowledgements:
LAFCo staff would like to thank the contributors to this Municipal Service Review. Input
instrumental in completing this report was provided by Liz Shorey, Deputy Director of
Community Development, and other City Staff.
Fortuna MSR/SOI Update [i]
Table of Contents
1.0 MSR/SOI BACKGROUND ................................................................................................. 1
1.1 Role and Responsibility of LAFCo ............................................................................... 1
1.2 Purpose of Municipal Service Reviews ....................................................................... 1
1.3 Purpose of Spheres of Influence ................................................................................. 2
1.4 Disadvantaged Unincorporated Communities ........................................................ 3
1.5 Organization of MSR/SOI Study ................................................................................... 4
2.0 CITY OF FORTUNA AGENCY OVERVIEW ........................................................................ 5
2.1 Overview ....................................................................................................................... 5
2.2 Formation and Development ..................................................................................... 6
2.3 Jurisdictional Boundary ................................................................................................ 8
2.4 Sphere of Influence ...................................................................................................... 9
2.5 Out of Agency Services ............................................................................................... 9
3.0 SOCIO-ECONOMICS ..................................................................................................... 10
3.1 Population and Development .................................................................................. 10
3.2 Land Use and Geographic Factors .......................................................................... 11
3.3 Disadvantaged Unincorporated Communities ...................................................... 15
4.0 ACCOUNTABILITY AND GOVERNANCE ....................................................................... 18
4.1 Governance ............................................................................................................... 18
4.2 Administration ............................................................................................................. 20
4.3 Accountability ............................................................................................................ 20
4.4 Shared Facilities .......................................................................................................... 20
5.0 CITY SERVICES AND INFRASTRUCTURE ......................................................................... 22
5.2 Public Works ................................................................................................................ 23
5.2.1 Water Services ...................................................................................................... 23
5.2.2 Wastewater .......................................................................................................... 28
5.2.3 Stormwater Drainage and Flood Control ......................................................... 34
5.2.4 Streets and Transportation .................................................................................. 39
5.3 Parks and Recreation ................................................................................................ 42
5.3.1 Parks, Recreation, Museum, and Transit ............................................................ 42
5.4 Community Development ........................................................................................ 44
Fortuna MSR/SOI Update [ii]
5.4.1 Planning and Building .......................................................................................... 44
5.5 Police and Emergency Services ............................................................................... 44
5.5.1 Law Enforcement ................................................................................................. 44
5.5.2 Emergency Services ............................................................................................ 46
5.6 Other Service Providers .............................................................................................. 48
6.0 FINANCE ......................................................................................................................... 49
6.1 Revenues and Appropriations .................................................................................. 49
6.2 Long-term Liabilities .................................................................................................... 52
6.3 Reserves ....................................................................................................................... 53
6.4 Financial Summary ..................................................................................................... 53
7.0 MSR DETERMINATIONS .................................................................................................. 54
8.0 SOI DETERMINATIONS .................................................................................................... 56
List of Figures
Figure 1: City of Fortuna Overview ........................................................................................... 7
Figure 2: Fortuna Community Plan Land Use Map (Northern Fortuna) .............................. 12
Figure 3: Fortuna Community Plan Land Use Map (Southern Fortuna) .............................. 13
Figure 4: City of Fortuna and Humboldt County Land Use .................................................. 14
Figure 5: City of Fortuna Disadvantaged Community Analysis ........................................... 17
Figure 6: City of Fortuna Staff Organization ........................................................................... 19
Figure 7: City of Fortuna Water Pressure Zones ...................................................................... 25
Figure 8: Storm Drainage Areas .............................................................................................. 36
Figure 9: General Fund Reductions 2020 ............................................................................... 50
Figure 10: 2020 Frozen or Eliminated Staff Positions ............................................................... 51
List of Tables
Table 1: City of Fortuna Summary Profile ................................................................................. 5
Table 2: City of Fortuna and Humboldt County Population ................................................ 10
Table 3: Fortuna City Council Members ................................................................................. 18
Table 4: City of Fortuna 2019 Managed Water Connections and Volume ....................... 23
Table 5: City of Fortuna Water Storage .................................................................................. 26
Table 6: City of Fortuna Projected Water Demand .............................................................. 26
Table 7: 2019-20 Water Service Rates ..................................................................................... 28
Table 8: Fortuna WWTF Design Flow and Loads .................................................................... 31
Table 9: Fortuna Wastewater Service Rates .......................................................................... 31
Table 10: Fortuna Stormwater Drainage Rates ..................................................................... 35
Table 11: City of Fortuna Net Position (in thousands of dollars) ........................................... 51
Table 13: City of Fortuna Financial Liability Summary ........................................................... 53
Fortuna MSR/SOI Update [iii]
1.0 MSR/SOI BACKGROUND
1.1 Role and Responsibility of LAFCo
Local Agency Formation Commissions (LAFCos) are independent regulatory commissions
that were established by the State legislature in 1963 to encourage the orderly growth
and development of local governmental agencies including cities and special districts.
Today, there is a LAFCo in each of California’s 58 counties. Humboldt LAFCo is a seven-
member commission comprised of two members of the Humboldt County Board of
Supervisors, two City Council members, two Special District representatives, and one
Public Member-At-Large. The Commission also includes one alternate member for each
represented category.
LAFCo is responsible for implementing the Cortese-Knox-Hertzberg Local Government
Reorganization Act of 2000 (“CKH Act”) (California Government Code Section 56000 et
seq.) for purposes of facilitating changes in local governmental structure and boundaries
that fosters orderly growth and development, promotes the efficient delivery of services,
and encourages the preservation of open space and agricultural lands. Some of LAFCo’s
duties include regulating jurisdictional boundary changes and the extension of municipal
services. This includes city and special district annexations, incorporations/formations,
consolidations, and other changes of organization. LAFCo seeks to be proactive in raising
awareness and building partnerships to accomplish this through its special studies,
programs, and actions.
The CKH Act outlines requirements for preparing Municipal Service Reviews (MSRs) for
periodic Sphere of Influence (SOI) updates. MSRs and SOIs are tools created to empower
LAFCo to satisfy its legislative charge of “discouraging urban sprawl, preserving open
space and prime agricultural lands, efficiently providing government services, and
encouraging the orderly formation and development of local agencies based upon
local conditions and circumstances (§56301). CKH Act Section 56301 further establishes
that “one of the objects of the commission is to make studies and to obtain and furnish
information which will contribute to the logical and reasonable development of local
agencies in each county and to shape the development of local agencies so as to
advantageously provide for the present and future needs of each county and its
communities.” SOIs therefore guide both the near-term and long-term physical and
economic growth and development of local agencies, and MSRs provide the relevant
data to inform LAFCo’s SOI determinations.
1.2 Purpose of Municipal Service Reviews
As described above, MSRs are designed to equip LAFCo with relevant information and
data necessary for the Commission to make informed decisions on SOIs. The CKH Act,
however, gives LAFCo broad discretion in deciding how to conduct MSRs, including
geographic focus, scope of study, and the identification of alternatives for improving the
Ch. 1 – MSR/ SOI Background [1]
efficiency, cost-effectiveness, accountability, and reliability of public services. The
purpose of a MSR in general is to provide a comprehensive inventory and analysis of the
services provided by local municipalities, service areas, and special districts. A MSR
evaluates the structure and operation of the local municipalities, service areas, and
special districts and discusses possible areas for improvement and coordination. While
LAFCos have no direct regulatory authority over cities and special districts, MSR’s provide
information concerning the governance structures and efficiencies of service providers –
and may also serve as the basis for subsequent LAFCo decisions. The MSR is intended to
provide information and analysis to support a sphere of influence update. A written
statement of the study’s determinations must be made in the following areas:
(1) Growth and population projections for the affected area
(2) Location and characteristics of any disadvantaged unincorporated communities
within or contiguous to the sphere of influence
(3) Present and planned capacity of public facilities, adequacy of public services,
and infrastructure needs or deficiencies
(4) Financial ability of the agency to provide services
(5) Status of and opportunities for shared facilities
(6) Accountability for community service needs, including governmental structure
and operational efficiencies
(7) Any other matter related to effective or efficient service delivery, as required by
Commission policy
This MSR is organized according to these determinations listed above. Information
regarding each of the above issue areas is provided in this document.
1.3 Purpose of Spheres of Influence
In 1972, LAFCos were given the power to establish SOIs for all local agencies under their
jurisdiction. As defined by the CKH Act, “‘sphere of influence’ means a plan for the
probable physical boundaries and service area of a local agency, as determined by the
commission” (§56076). All boundary changes, such as annexations, must be consistent
with an agency’s sphere of influence with limited exceptions.
Pursuant to Humboldt LAFCo policy, a MSR is conducted prior to or in conjunction with its
mandate to review and update each local agency’s sphere of influence every five years
or as necessary. The municipal service review process is intended to inform the
Commission as to the availability, capacity, and efficiency of local governmental
services prior to making sphere of influence determinations.
LAFCo is required to make five written determinations when establishing, amending, or
updating an SOI for any local agency that address the following (§56425(c)):
Ch. 1 – MSR/ SOI Background [2]
(1) The present and planned land uses in the area, including agricultural and open
space lands.
(2) The present and probable need for public facilities and services in the area.
(3) The present capacity of public facilities and adequacy of public services that the
agency provides or is authorized to provide.
(4) The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
(5) For an update of an SOI of a city or special district that provides public facilities or
services related to sewers, municipal and industrial water, or structural fire
protection, the present and probable need for those public facilities and services
of any disadvantaged unincorporated communities within the existing sphere of
influence.
Service reviews may also contain recommendations for sphere of influence or
government structure changes needed to implement positive service changes. Where
more detailed analysis of service options is necessary, service reviews may contain
recommendations for special studies where there is the potential to reduce service gaps
and improve service levels.
1.4 Disadvantaged Unincorporated Communities
SB 244 (Chapter 513, Statutes of 2011) made changes to the CKH Act related to
“disadvantaged unincorporated communities,” including the addition of SOI
determination number 5 listed above. Disadvantaged unincorporated communities, or
“DUCs,” are inhabited territories (containing 12 or more registered voters) where the
annual median household income is less than 80 percent of the statewide annual
median household income.
Humboldt LAFCo has adopted DUC policy, which identifies 31 inhabited unincorporated
“legacy” communities for purposes of implementing SB 244. These legacy communities
were defined as part of the Humboldt County 2014 Housing Element for areas not located
within the sphere of influence of a city. Therefore, additional review is needed to
determine “disadvantaged unincorporated communities” within and adjacent to city
spheres of influence. As such, this MSR will document DUCs associated with the City of
Fortuna SOI.
CKH Act Section 56375(a)(8)(A) prohibits LAFCo from approving a city annexation of
more than 10 acres if a DUC is contiguous to the annexation territory but not included in
the proposal, unless an application to annex the DUC has been filed with LAFCo. The
legislative intent is to prohibit selective annexations by cities of tax-generating land uses
while leaving out under-served, inhabited areas with infrastructure deficiencies and lack
of access to reliable potable water and wastewater services. DUCs are recognized as
social and economic communities of interest for purposes of recommending SOI
determinations pursuant to Section 56425(c).
Ch. 1 – MSR/ SOI Background [3]
1.5 Organization of MSR/SOI Study
This report focuses on key issues that may be particularly relevant to the subject agency
while providing required LAFCo MSR and SOI determinations. This report provides the
following:
A description of the subject agency;
o
Any new information since the last MSR and a determination regarding the need
o
to update the SOI;
MSR determinations for Commission review; and
o
Any other issues that the Commission should consider in the MSR/ SOI.
o
Ch. 1 – MSR/ SOI Background [4]
2.0 CITY OF FORTUNA AGENCY OVERVIEW
2.1 Overview
The City of Fortuna is located in Humboldt County, approximately 20 miles south of Eureka
and 253 miles north of San Francisco. The city lies along Highway 101, east of the Eel River
and is bounded by rising hillsides, bluffs, scattered forests, and rural residences.
Fortuna is governed by a five-member city council whose members are elected at large.
The city provides a wide range of municipal services including general government,
finance, community development, law enforcement, public works, parks, water, and
wastewater. The City also contracts with outside agencies to provide certain municipal
services, such as garbage collection. The Fortuna Fire Protection District (FFPD), a
separate local government agency, provides fire protection and emergency services to
the city and surrounding unincorporated areas. For more information regarding these
services, refer to Chapter 5 of this report.
Table 1: City of Fortuna Summary Profile
FORMATION
Incorporation Date February 20, 1906
General Law City, California Constitution, Article 11, Section 2,
Enabling Legislation
and California Government Code §34000 et seq.
CONTACT
Primary Contact Liz Shorey, Deputy Director of Community Development
E-mail lshorey@ci.fortuna.ca.us
City Hall/ Mailing Address 621 11th Street, Fortuna, CA 95540
Phone 707.725.7600
Website www.friendlyfortuna.com
GOVERNANCE
Governing Body City Council
Meeting Schedule 1st & 3rd Monday of every month, 6:00 PM
Meeting Location City Hall Council Chamber, 621 11th Street, Fortuna, CA 95540
SERVICES
Water, wastewater, law enforcement, streets and street
Municipal Services maintenance, stormwater drainage, planning and zoning, and
parks and recreation
Areas Served Incorporated City Limits is approximately 4.7 sq. mi.
Ch. 2 – Agency Overview [5]
A municipal service review for Fortuna was previously conducted in 2008. This review
serves to build upon the previous analysis conducted and update Fortuna’s SOI to reflect
current local conditions.
2.2 Formation and Development
The City of Fortuna is located within Wiyot ancestral territory that extends from Little River
near Trinidad to Bear River Ridge near Scotia, and east to Berry Summit and Chalk
Mountain. Wiyot people lived in permanent villages along the waterways which also
served as travel and trade routes. This region supported a precontact population
estimated at 1,500 to 2,000 Wiyot peoples. However, this population declined to
approximately 200 after the 1860 Massacres, then to 100 by 19101. Euro-American settlers
began to inhabit the lower Eel River area in the early 1850s.
The City of Fortuna was incorporated on February 20, 1906, making it the fifth city formed
in Humboldt County. Fortuna’s physical form reflects 125 years of growth and
evolution2. One of Fortuna’s previous names, “Springville,” was a natural outgrowth of
the Springville Mill, the first of several lumber mills within what is now the Fortuna Planning
Area. According to historic accounts, the initial 16 lot plat of the town occurred in
18753. By 1880, the town had grown to 88 lots. These lots, located near the intersection
‐
of 11th Street (formerly 1st Street) and Main Street, were organized into a traditional
rectilinear block and street pattern, as shown on the original town plat. In 1884, the
citizens of Springville (as they preferred to call their town) petitioned the California
Legislature to change the name of the town to Fortuna. The name Fortuna, meaning
“good fortune,” was selected due to its excellent location between the redwood forests
and the Eel River Valley and proximity to the Pacific Ocean4.
As Eureka and Arcata emerged as major seaports, as well as the centers of political and
economic influence in the region, the road system linking Fortuna and Rohnerville to
these ports was critical to the early growth of both towns. The early maps of the area
suggest that this primary road access generally preceded the historic alignment of U.S.
Route 101.
In 1906, the California Northwestern Railroad ran north from San Francisco for 152 miles,
and the Eureka, Scotia, and Camp Five Railroad ran south from Eureka for a distance of
36 miles. Until a rail connection was completed, the 100 mile gap between the rail lines
required stagecoach travel, followed by automobiles in the early 1900s. Rough
‐
topography and steep grades made the overland journey particularly difficult; mountain
streams made the road impassible in winter and during spring runoff. Ferries were required
at major river crossings.
1 Today, the Wiyot Tribe and the Bear River Band of the Rohnerville Rancheria as sovereign nations have rebuilt their
communities and currently have over 600 tribal citizens each, living on tribally owned lands and surrounding
communities.
2 City of Fortuna MSR. Humboldt LAFCo. 2008
3 City of Fortuna General Plan 2030
4 Ibid
Ch. 2 – Agency Overview [6]
Figure 1: City of Fortuna Overview
Ch. 2 – Agency Overview [7]
The timber industry was central to the economic development of Fortuna. Timber
harvesting, milling and shipping accounted for a major portion of the employment for
the area for the 65-year period from 1865 – 19305. During the height of this natural
resource economy there were approximately eight lumber mills in the area, each with
an independent rail system. The industry was sustained until 1930 when the severe
economic impacts of the Great Depression swept the country. The Newburg Mill closed
in 1931 and was dismantled in 1934.
In addition to the timber and lumber industry, the area was widely known for its excellent
agricultural lands, particularly for the production of vegetable crops, fruits (many apples
from southern Humboldt and the Mattole Valley came through Fortuna by boat and
wagon), and berries, as well as for the Eel River fisheries. The area most recently
occupied by the Pacific Lumber Mill was once the location of a large “evaporator” or
complex of drying sheds for drying apples. This local agricultural economic resource
provided an important support for the logging and lumber industries that dominated the
regional economy.
2.3 Jurisdictional Boundary
Fortuna’s jurisdictional boundary or “city limits” encompasses approximately 5 square
miles (3,351 acres). This accounts for several annexations that have taken place since
the last MSR, as summarized below.
• The Riverwalk Annexation, approved by LAFCo in 2013 (Resolution No. 13-04),
included 86 acres of predominantly commercial and visitor serving uses west of
Riverwalk Drive known as the “Riverwalk District”.
• The Upper 9th Street Annexation, approved by LAFCo in 2015 (Resolution No. 15-
03), included approximately 50 acres of improved and unimproved single family
residential and agricultural uses generally located north of downtown Fortuna,
and accessed via 9th Street and Home Avenue. The Upper 9th Street area was an
existing water service area of the city.
• In 2016, the City annexed 86.6 acres of land (22 parcels) as part of the Strongs
Creek Valley Annexation (LAFCo Resolution No. 16-06). This annexation was
initiated by the City of Fortuna to address service needs for existing residences and
to facilitate development of the Fortuna Community Health Center property
owned by the McLean Foundation.
The above annexations were proposed by the City of Fortuna consistent with the Fortuna
General Plan that contemplates four annexation areas within the city’s Planning Area.
The General Plan includes policies and programs applicable to these areas as well as
pre-zoning these areas consistent with the city’s Land Use Diagram.
5 Ibid
Ch. 2 – Agency Overview [8]
2.4 Sphere of Influence
Currently, Fortuna’s SOI extends beyond its jurisdictional boundary and encompasses an
additional six square miles6. The City’s SOI includes the Palmer Creek, Carson Woods
Road, and Nelson Drive areas to the north; low density residential and agricultural areas
east of Rohnerville Road including the Loop Road and Mill Street areas; and the
Rohnerville airport area to the south of the city, which includes a range of agricultural,
residential, public facility and commercial and industrial uses. Only minor changes are
being proposed to the City’s SOI to better follow parcel lines and to capture land uses
that would require services in the future or that would be considered for annexation in
the future. Additionally, the SOI considers the Urban Development Areas and Urban
Expansion Areas as shown in Figure 3 and 4 in Section 3.2.
2.5 Out of Agency Services
The City serves approximately 55 water customers located outside the City boundary but
within its sphere of influence. The majority of the residential water service connections are
located north in the Carson Woods Road and Nelson Drive areas, and south along
Rohnerville Road near Fox Hill Lane. Many of these connections are considered legacy
connections and are not subject to current LAFCo review. Any future proposals to extend
services outside the city’s boundary would be subject to LAFCo review and approval
pursuant to Government Code Section 56133 and Humboldt LAFCo policy.
6 Ibid
Ch. 2 – Agency Overview [9]
3.0 SOCIO-ECONOMICS
3.1 Population and Development
Fortuna, along with Arcata and McKinleyville, represent Humboldt County’s primary
growth areas. There are approximately 12,259 people residing in the City of Fortuna and
the average household size is 2.55 persons7. Table 2 identifies the City of Fortuna and
Humboldt County’s historic and projected population. From 2010 till 2019, Fortuna’s
growth rate was 0.31%. Using this growth rate, the 2030 population is estimated at 12,679
or an additional 420 people. At this time, it is uncertain how the Covid-19 pandemic will
affect the population of the City and the county as a whole. There could be an increase
or decrease in population growth rates across the county.
As indicated below, the city’s projected population is 16,817 in 2030 according Fortuna’s
2030 General Plan, which represents an additional 4,558 residents. The information
included in Table 2 is a mixture of Census data, City of Fortuna General Plan data, and
Humboldt County General Plan data.
Table 2: City of Fortuna and Humboldt County Population8
City of Fortuna Humboldt County
Year
Population % Change Population % Change
1980 7,591 - 108,525 -
1990 8,788 15.8% 119,118 9.8%
2000 10,497 19.4% 126,518 6.2%
2010 11,926 13.6% 134,623 6.4%
2020 14,752 21.7% 139,033 3.3%
2030 16,817 14% 140,608 1.1%
As the population of Fortuna continues to grow, more housing and associated
infrastructure will be required to accommodate new residents. According to the
Department of Finance, in 2018 approximately two thirds (69.6 percent) of the city’s
housing stock was made up of single family homes, nearly one quarter (23.3 percent)
‐
were multifamily units, and the remaining 7 percent were mobile homes9. According to
‐ ‐
the City’s building permit records, 127 units were constructed between 2014 and 2018.
Single family homes accounted for 61 units and the remaining 66 were multi-unit
7 Census Quick facts Population Estimates, July 1, 2019
8 Census Data, City of Fortuna General Plan 2030, and Humboldt County General Plan.
9 City of Fortuna Housing Element. Placeworks. August 2019.
Ch. 3 – Socio-Economics [10]
developments. The City of Fortuna has a projected housing need of 290 residential units
for the 2019 to 2027 period10.
The City’s 2014–2019 Housing Element includes goals, policies and programs to guide
growth and development within the community. One such program (H-23) states that
the City will analyze existing and potential infrastructure financing measures for their
ability to meet infrastructure needs without an adverse impact to housing costs and
identify and apply for state or USDA infrastructure funding programs to support
improvement efforts. The City will also consider allowing fee exemptions when energy
and water conservation measures are considered for new development. This has been
included to help minimize infrastructure costs for residential development by identifying
infrastructure needs and available sources of funding for infrastructure improvements.
The City also collects development fees for drainage, traffic, water, and sewer capital
improvements. These fees are important because new development has been severely
restricted in the past due to inadequate public facilities. Traffic fees are based on the
improvements needed in the transportation system to accommodate future
development. The City has taken the approach to have new development pay its fair
share of the cost of the public infrastructure needed to accommodate it so that the costs
are not borne by the existing residents through general fund subsidies.
Site improvements are an important component of new development and include
roads, water, sewer, and other infrastructure necessary to serve the new development.
Improvement standards are established by the City’s Improvement Standards and
Specifications. The City has been working on revising standards, including required street
widths, in an effort to reduce development costs. The City is currently using Senate Bill 2
Planning Grants to update Improvement Standards and Specifications, the Accessory
Dwelling Unit Ordinance, and identify infrastructure financing among other tasks.
According to the City’s most recent Housing Element, there is sufficient water and
wastewater capacity to accommodate anticipated housing needs11. To comply with SB
1087, as the water and sewer provider, the City will continue to grant priority for service
to proposed developments that include units affordable to lower income households.
Dry utilities, including refuse collection, electricity, and telephone service, are available
‐
to all areas within the City with sufficient capacity to meet current and future needs.
3.2 Land Use and Geographic Factors
Existing land uses in the City of Fortuna are dominated by single-family residential
development, with commercial corridors along Main Street and Fortuna Boulevard, and
a scattering of multi-family, industrial, public and open space uses. Downtown Main
Street serves as the Central Business District and is the historic, civic and cultural core of
the community.
10 Ibid.
11 City of Fortuna Housing Element. Placeworks. August 2019.
Ch. 3 – Socio-Economics [11]
The City of Fortuna has a full range of land uses including very low to high density
residential, commercial, office, industrial, public, parks, agricultural, and open space
designations. The 2030 General Plan Land Use Element establishes policies and programs
to maintain the existing pattern of land uses within the city while anticipating and
providing for future growth and development within the Fortuna Planning Area. Fortuna
has policies that support infill development, such as allowing mixed use developments in
commercial districts. The 2030 General Plan Land Use Element designates several focus
‐
areas for its commercial areas, including Fortuna Boulevard, Downtown, the Riverwalk
District, Rohnerville, and the Mill District.
Making up a large area of the city is the former PALCO mill site, which has not been in
operation since 2006. The 73-acre site is currently zoned for industrial uses. The City has
plans to prepare a Mill District Specific Plan that would establish design and development
criteria and phased development provisions for the site.
In addition to the land use designations listed above, the Fortuna Community Plan (1985)
guides land uses and development within the unincorporated areas surrounding the city.
Fortuna Community Plan policy excerpts and land use maps are included in Appendix C
of the Humboldt County General Plan (2017). These identify Urban Development Areas
(UDA) and Urban Expansion Areas (UEA), with consideration and/or provision of
appropriate types and levels of urban facilities and services to be directed toward the
UDAs and followed by Phase I UEAs as shown on the Land Use Map. The UDAs and UEAs
are included in the existing and proposed SOI.
Figure 2: Fortuna Community Plan Land Use Map (Northern Fortuna)
Ch. 3 – Socio-Economics [12]
Figure 3: Fortuna Community Plan Land Use Map (Southern Fortuna)
In an effort to reduce the cost of development due to infrastructure costs, the City has
included policies in its most recent Housing Element that encourage infill, especially in the
mid-Fortuna area12. Infill projects are typically less costly since there is already existing
infrastructure in place. This also reduces the future maintenance and repair costs, and
the City can more efficiently provide services.
Agricultural Land and Open Space
The City of Fortuna General Plan includes lands designated for Parks, Greenways and
Recreation (PRK), Agriculture (AG) and Open Space (OS). Agricultural uses in and
surrounding the City of Fortuna includes farmland, timberland, and lands under
Williamson Act contract. According to the City’s General Plan EIR, prime farmland and
timberland acreages collectively represent 22.2% of the Planning Area’s 8,051 acres. No
land within the incorporated City limits is under Williamson Act contract. However, 396
acres of farmland and timberland under Williamson Act contract are in the SOI portion
of the Planning Area. The 2030 General Plan does not designate any of this land for urban
use, meaning the General Plan is in conformance with the Williamson Act.
12 City of Fortuna, Housing Element. Policies H-6.5 and H-6.6. August 2019.
Ch. 3 – Socio-Economics [13]
Figure 4: City of Fortuna and Humboldt County Land Use
Ch. 3 – Socio-Economics [14]
3.3 Disadvantaged Unincorporated Communities
LAFCo is required to evaluate disadvantaged unincorporated communities (DUCs) as
part of this review, including the location and characteristics of any such communities
within or contiguous to the Fortuna SOI. As noted previously, a DUC is an unincorporated
geographic area with 12 or more registered voters with a median household income
(MHI) of 80% or less of the statewide median household income. The identification of
DUCs is intended to ensure that the needs of these communities are met when
considering service extensions and/or annexations in unincorporated areas.
While by definition cities are not DUCs, the MHI of the city under review is a helpful
indicator to establish likely regional economic conditions. The 2018 MHI for the City of
Fortuna is $45,89313, which is 64% of California’s statewide MHI of $71,22814. The City is
therefore considered to be a disadvantaged community and it is likely that the City’s
adjacent unincorporated neighborhoods may qualify as DUCs. Special consideration will
therefore be given to any DUCs affected by future annexation proposals consistent with
GC §56375(8)(A) and LAFCo Policy. The City is responsible for providing water and
wastewater services. The Fortuna Fire protection District is responsible for providing
structural fire protection services.
Pursuant to GC §65302.10(b), SB 244 also requires each City to plan for DUCs in their
General Plan Land Use Element in conjunction with adopting their Housing Element. To
comply with this requirement, each city must identify, describe, and map each island
and fringe community within the city’s Sphere of Influence that qualifies as a DUC;
analyze the water, wastewater, stormwater drainage, and structural fire protection
needs or deficiencies of the DUCs; and analyze potential funding mechanisms that could
make the extension of services to the DUCs financially feasible.
In 2018, the City completed a Disadvantaged Community Analysis according to SB 244.
Through this process, two disadvantaged communities were identified in the SOI, the
community of Palmer Creek (DUC 1) and the community surrounding Becker/Blair Lane
(DUC 2)15 (see Figure 5). The community of Palmer Creek is discussed below. The
community of Becker/Blair Lane is adequately served for fire and water services,
however, it is underserved with wastewater service. In response, funding and financing
mechanisms were identified to further development of adequate service16. The City also
amended the Fortuna General Plan to incorporate DUC policies and reports (Resolution
2018-33).
13 American Community Survey 5-year Estimates (2018), Table S1903 – Median Income in the Past 12 Months, Fortuna City,
CA. Accessed January 22, 2020.
14 American Community Survey 5-year Estimates (2018), Table S1903 – Median Income in the Past 12 Months, Fortuna
California. Accessed January 22, 2020.
15 Memo from Michael Baker International to Liz Shore, Deputy Director of Community Development. May 23, 2018.
16 Memo from Michael Baker International to Liz Shore, Deputy Director of Community Development. July 10, 2018.
Ch. 3 – Socio-Economics [15]
Several adjacent residential areas meet the registered voter criteria for DUC evaluation:
the communities of Hydesville and Carlotta located southeast of Fortuna along Highway
36, and the community of Palmer Creek located north of the city.
The community of Carlotta receives fire protection services from the Carlotta CSD
through the Carlotta Volunteer Fire Department, whereas community water and
wastewater services is not available to the Carlotta community. Carlotta has a MHI of
$61,458 which is 86 percent of the California MHI17 and does not qualify it as a DUC.
Carlotta has been identified as a legacy community in the Humboldt County Housing
Element. Legacy communities are unincorporated areas that are geographically
isolated and have been inhabited for at least 50 years18. Legacy communities and
disadvantaged unincorporated communities often have shared boundaries.
The community of Hydesville receives water services from the Hydesville County Water
District, which has two groundwater wells located at Ward Creek, and fire protection
services from the Fortuna Fire Protection District. Community wastewater services are not
available to the Hydesville community. Hydesville Census Designated Place has a MHI of
$55,577 which is 78 percent of the California MHI and qualifies it as a DUC19.
Another qualifying DUC is the community of Palmer Creek adjacent to the northern
boundary of the City and within its SOI. This small community has a MHI of $48,292 which
is 68 percent of the California MHI20. The community is currently served by the Palmer
Creek Community Services District (CSD) which provides water and wastewater services.
Wastewater is transported from the Palmer Creek CSD system to the City’s wastewater
treatment plant. Fire protection services are provided by Fortuna FPD in the Palmer Creek
area.
Within a DUC, three basic services are evaluated: water, wastewater, and fire protection.
Should future annexations or service extensions be proposed for the City of Fortuna,
special consideration will be given to any potential DUCs affected by the annexation
consistent with GC §56375(8)(A) and LAFCo Policy.
17 American Community Survey 5-year Estimates (2018), Table B19103 – Median Income in the Past 12 Months, Block
Group 2, Census Tract 109.02, Humboldt County, California. Accessed October 22, 2020.
18 Humboldt County General Plan 2017- Housing Element Appendix G
19American Community Survey 2018 5-year Estimates (2018) S1903 – Median Income in the Past 12 Months, Hydesville
CDP. Accessed October 22, 2020.
20 US Census, American Community Survey 2018 5-year Estimates, Humboldt County Block Group 108.2, Table B19013.
Accessed April 7, 2020.
Ch. 3 – Socio-Economics [16]
Figure 5: City of Fortuna Disadvantaged Community Analysis
Ch. 3 – Socio-Economics [17]
4.0 ACCOUNTABILITY AND GOVERNANCE
4.1 Governance
Fortuna is a charter city, utilizing the Council-Manager form of government. The five-
member city council is elected at large to overlapping four-year terms by registered
voters that reside within the city limits. The council members in turn select one of their
own members to serve as mayor. The city employs a City Manager who is responsible for
administering and implementing the policies set by the council. In the Council-Manager
form of government, legislative and policy functions are vested in the City Council, while
the City Manager runs the day-to-day business of the city.
The City Council is the policy setting body that is responsible for enacting ordinances,
establishing policy, adopting and amending the budget, and adopting resolutions. The
‐
Mayor has appointive powers, subject to council approval. The City Council appoints the
City Manager to support their efforts and oversee the daily operations of the City to
ensure that the Council’s policies, programs, and priorities are implemented. Several
boards, commissions, and committees assist in carrying out various functions of city
government. This includes the Planning Commission, Parks and Recreation Commission,
Measure E Oversight Committee, and Historical Commission.
Table 3: Fortuna City Council Members21
Council Members Seated Term Expiration
Sue Long, Mayor 2010 2022
Tami Trent, Mayor Pro Tem 2012 2024
Mike Losey 2020 2024
Mike Johnson 2018 2022
Jeremy Stanfield 2018 2022
Regularly scheduled City Council meetings are held on the first and third Monday of the
month at 6:00 p.m. at City Hall. Regularly scheduled Planning Commission meetings are
held on the second and fourth Tuesdays of every month at 6:00 p.m. at City Hall. All
meetings are open to the public in accordance with the Brown Act and are publicly
posted a minimum of 72 hours prior to the meeting on the city’s website and at the kiosk
located at City Hall (621 11th Street).
21 Fortuna City Council Meeting Agenda. May 19, 2020. Accessed July 20, 2020.
Ch. 4 – Accountability & Governance [18]
Figure 6: City of Fortuna Staff Organization
Ch. 4 – Accountability & Governance [19]
4.2 Administration
The City of Fortuna presently has six operating departments: Finance, City Clerk/Human
Resources, Police, Community Development, Public Works, and Parks and Recreation.
Each department has a director who is responsible to the City Manager. Currently the
city employs 79 full-time employees and 13.11 regular part-time employees for a total of
92.11 employees22.
The City Manager is responsible for directing and supervising the day-to-day
administration of the city to ensure that laws, ordinances, resolutions, contracts, and
leases are enforced and executed. This is in addition to the City Manager's specific duties
and responsibilities as set forth in the Fortuna Municipal Code (F.M.C.) §§ 2.08.070.
4.3 Accountability
When conducting service reviews and reviewing proposals, LAFCo considers an
agency’s accountability for community service needs, including governmental structure,
operational efficiencies, financial resources, and promoting public access.
The City offers multiple ways to keep citizens informed about services, meetings, finances,
and decision-making processes. Public notices are posted on the website. Past meeting
agendas and meeting minutes may be found on the home page of the city’s website.
The public may also provide verbal comments or complaints by phone or in person at
City Hall during business hours and/or at City Council meetings during the general public
comment period.
4.4 Shared Facilities
The city collaborates with other public agencies to provide service more efficiently or
effectively. Some of Fortuna’s collaborative activities include the following:
An agreement with Palmer Creek CSD to receive wastewater for treatment and
o
disposal.
An agreement with Rohner Community Recreation and Park District to provide
o
administrative staffing support as needed.
A long-term relationship with the Fortuna Fire Protection District, which provides fire
o
protection and rescue services to the Fortuna and Hydesville areas.
Membership in the Redwood Coast Energy Authority (RCEA), a joint powers
o
authority founded in 2003 whose members include the seven cities, the county,
and the Humboldt Bay Municipal Water District. RCEA administers Humboldt
County’s Community Choice Energy program, which offers local renewable
energy and lower energy prices to Humboldt County residents and businesses.
22 City of Fortuna Annual Operating Budget Fiscal Year 2020-2021.
Ch. 4 – Accountability & Governance [20]
Membership in the Humboldt County Association of Governments (HCAOG), a
o
JPA comprised of the seven cities and the county. HCAOG is the designated
Regional Transportation Planning Agency and is largely responsible for
programming state highway, local street, and road improvements, and public
transportation resources.
Membership in the Redwood Region Economic Development which is a
o
collaboration of elected officials from throughout Humboldt County dedicated to
economic and business development.
California League of Cities, an association of California city officials who work
o
together to enhance knowledge and skills, exchange information and combine
resources to influence policy decisions that affect cities.
Ch. 4 – Accountability & Governance [21]
5.0 CITY SERVICES AND INFRASTRUCTURE
The City of Fortuna provides the full range of urban services with the exception of fire
protection. Structural fire protection services are provided by the Fortuna Fire Protection
District, both within the City and in surrounding areas. The services Fortuna provides and
the departments that administer them are as follows:
Public Works Community Development
Water Planning
Wastewater Building
Stormwater Drainage Police and Emergency Services
Streets and Lighting Law Enforcement
Parks and Recreation Emergency Services
Parks
Recreation
Museum
Transit
Among the services enumerated above, the provision of water supply and wastewater
disposal facilities are generally the major determinants of the location of future
development. The need for the other urban services tends to follow the provision of water
and sewers as development occurs and population increases. For this reason, the
discussion which follows focuses primarily on the city's capability to provide water and
wastewater facilities and services. Other services provided by the city are given a brief
overview.
Ch. 5 – Services & Infrastructure [22]
5.2 Public Works
5.2.1 Water Services
The City of Fortuna provides drinking water from city-owned and operated groundwater
wells. The City’s Public Works Department operates and maintains the water pumping
and treatment facilities and equipment. Routine maintenance of pumping and
treatment facilities is done on a daily basis. The Public Works Department also utilizes a
computer-generated maintenance schedule. The City of Fortuna provides water to
approximately 12,000 individuals with 5,727 service connections23.
Table 4: City of Fortuna 2019 Managed Water Connections and Volume24
# of Municipal Connections Volume of Water Supplied
5,727 424 Million Gallons
Water Supply and Treatment
The City’s water source is groundwater from five wells located on Eel River Drive between
Drake Hill Road and Kenmar Road near the southwest corner of the city. These wells are
known as Well #1, #2, #3, #4, and #5 and are considered most vulnerable to human and
animal activity, including agricultural irrigation and drainage, grazing, and septic
systems25. The City currently has water rights allocations to extract up to 1,642 acre-feet
per year.
The City’s Urban Water Management Plan describes the wells as shallow (less than 100
feet deep). Four pumps, one situated at each well, pump water through the aeration
tower at the Corrosion Control Facility and into a 120,000-gallon wet well, where water is
also chlorinated. Treated water from the wet well is pumped through two transmission
mains (12 inch and 14 inch) to the distribution system network26. The Corrosion Control
Facility has three 100-horsepower pumps; running in an alternating pattern with a
maximum of only two pumps operating together at one time27. The pumps produce a
maximum of approximately 1,900 gallons per minute or 2.736 million gallons per day
(MGD). The highest flow day in the last six years was measured at 2.458 MGD.
The fifth well pump is a high head system that delivers water directly to the Stewart Street
reservoirs through the City’s distribution system.
23 City of Fortuna 2019 Consumer Confidence Report
24 City of Fortuna 2019 Consumer Confidence Report
25 City of Fortuna 2019 Consumer Confidence Report
26 City of Fortuna MSR. Humboldt LAFCo. 2008
27 Ibid
Ch. 5 – Services & Infrastructure [23]
Distribution System
The Utilities Division of the City’s Public Works Department operates and maintains the
underground water infrastructure, including water mains and related items such as water
meters and other items located in the street right of way. The Engineering Division of the
Public Works Department is responsible for the orderly development of the City’s water
system and provides engineering design services.
Drinking water testing is conducted on a continuous basis, according to state and federal
laws, and findings are reported annually in a Consumer Confidence Report and monthly
to the State Water Resource Control Board Division of Drinking Water through a required
self-monitoring report. According to the 2019 Consumer Confidence Report, the City
received a violation for the amount of chlorine within the treatment system28 due to high
reservoir disinfection levels entering the distribution system. This occurred for two days and
was remedied by flushing the distribution system and testing residuals until levels returned
to acceptable parameters. No other violations were noted.
The City’s distribution system includes 40 miles of piping, 4 reservoirs that store over 8
million gallons of water, and 8 pump stations29. The system is composed of both new and
old piping, with a mix of older asbestos-cement and cast-iron pipe, and newer polyvinyl
chloride or PVC pipe30.
The system is divided into seven separate pressure zones (see Figure 431). Each zone is
pressurized by a series of pumps, reservoirs, water tanks and/or hydro-pneumatic tanks.
The seven pressure zones in the city are determined by location and the hydraulic grades
of the system. Pressure zones 3 and 5 and 4 and 6 have been recently combined. The 4
City-owned reservoirs and 8 pump stations are inspected on a daily basis.
Water Storage
The City owns and maintains 4 enclosed reservoirs which have a combined storage
capacity of 8.25 million gallons (see Table 5). The Holman reservoir was demolished in
2013 during the pressure zone 3 and 5 intertie project32. In addition to daily inspections
and maintenance, these reservoirs are regularly lowered and filled to ensure the freshest
water is available to customers. Based on the average daily demand noted below,
these reservoirs could potentially provide up to seven days of water in the event water
supply is interrupted.
28 City of Fortuna 2019 Consumer Confidence Report
29 City of Fortuna 2019 Consumer Confidence Report
30 Ibid
31 City of Fortuna 2015 Urban Water Management Plan. Freshwater Environmental Services. May 25, 2016.
32 City of Fortuna, Public Works Department, Personal Communication. October 5, 2020.
Ch. 5 – Services & Infrastructure [24]
Figure 7: City of Fortuna Water Pressure Zones
Ch. 5 – Services & Infrastructure [25]
Table 5: City of Fortuna Water Storage33
Reservoir Name Year Built Capacity
Campton 1989 1 million gallons
Hillside 1989 250,000 gallons
Vancil 1964 5 million gallons
Stewart 2012 2 million gallons
Total ~8,250,000 million gallons
Water Demand
The City currently serves 5,727 water connections of which 5,170 are residential and 557
are commercial/other34. Based on water supplied during 2019, there is an approximate
average daily demand of 1.16 million gallons which is 42% of the total daily treatment
capacity. Annual water supplied by the City has increased by 7% from 395.3 MG in 2015
to 423.54 MG in 2019.
According to City Staff, there are two subdivisions that have been approved and are
under construction and would require City water service, but the parcel maps have not
been recorded yet. First, there is the Fitze Planned Unit Development of 12.9 acres into
single family residential parcels ranging in size from 1,632-1,972 square feet and open
space parcel (APNs 200-082-005 and 202-121-002) located on the south side of Redwood
Way between Maxwell Street and Rohnerville Road. Second, there is the Cook
Subdivision of 1.82-acre parcel into eight single family residential parcels (APN 040-282-
013) located on the west side of Fortuna Boulevard north of Alder Dive. There is also
adequate fire flow capacity throughout the City35. Based on the current demand, the
City is using approximately 1,300-acre feet or 79% of its 1,642-acre feet groundwater
allocation under current water rights which allows some room for growth.
Based on City projections, the average monthly water demand could increase 8% by
2025 to 38.12 MG per month as shown in Table 636. This could bring yearly demand up to
457 MG or approximately 85% of the City’s water rights allocation.
Table 6: City of Fortuna Projected Water Demand
Demand (MG)
Year Monthly Annually
2019 35.30 423.60
2021 35.86 430.32
2022 36.42 437.04
2023 36.99 443.88
2024 37.55 450.60
2025 38.12 457.44
33 City of Fortuna, Public Works Department, Personal Communication. October 5, 2020.
34 City of Fortuna, Public Works Department, Personal Communication. October 5, 2020.
35 City of Fortuna, Public Works Department, Personal Communication. August 27, 2020.
36 City of Fortuna, Public Works Department, Personal Communication. August 27, 2020.
Ch. 5 – Services & Infrastructure [26]
Capital Improvement Projects
The City annually updates their Capital Improvement Plan and continues to work on
system repairs and upgrades including replacement of aging pipeline. In the last 5 years
the City has completed several projects including the following:
• The City completed the Stewart Street Reservoir Replacement Project on March
20, 2013. This involved the replacement of two 0.5 MG tanks with one 2 MG
reservoir with a pre-stressed concrete tank, thereby increasing the capacity for
the City’s largest pressure zone by 1 MG. The project also replaced a booster
station which feeds Vancil Reservoir.
• The City completed a combination of two of its pressure zones on March 28, 2014,
resulting in a total of seven pressures zones. The project combined zones 3 and 5,
which use a hydro pneumatic system through two booster stations connected by
supervisory control and data acquisition (SCADA). Project completion involved
deconstruction of an elevated tank which held 35,000 gallons of water at zone 3,
which was then transformed into a hydro pneumatic system and combined with
zone 5, an existing hydro pneumatic system.
• The City combined pressure zones 4 and 6 during the month of July 2020, which
will continue to operate independently, but will be able to back feed if necessary,
using a Pressure Regulating Valve station.
The following projects were identified in the 2020-2021 CIP with a total cost of $1,281,60037.
• Vancil Reservoir Site Rehabilitation Project
• Corrosion Control Facility Piping and Well Replacement Project
• Water Tank Recoating Project
• Kenmar and Drake Hill Pump House Stationary Gensets
• Drake Hill Water Pump House Drainage Project
• Zones 4 and 6 Intertie Project
• Downtown Water Line Replacement Project
• 11th Street Water Main Project
• Corrosion Control Facility Electrical Project
• 12th Street Water Main Project
Water Rates
The rates listed below were established in Fiscal Year 2010-201138. Besides service charges,
other sources of revenue include connection fees and late fees. The City is expected to
complete rate studies and propose a rate increase within the next 1-2 years for water
services.
37 City of Fortuna CIP FY 20-21
38 City of Fortuna, Finance Department, Personal Communication. October 5, 2020.
Ch. 5 – Services & Infrastructure [27]
Table 7: 2019-20 Water Service Rates39
Charge Type Monthly Charge
Inside City Rate Base Fee for 5/8” or 3/4” pipe $23.04
(most residences)
1” $44.07
1 ½” $87.21
2” $147.61
3” $320.16
4” $561.73
6” $1,251.95
301 - Above cu. ft. (consumption) $1.90 per 100 cu. ft.
Outside City Rate Outside the City limits service area, the rate 1.5 x service rate
charged shall be one and one-half (1.5) times within City limits
the rate for service within the City limits.
5.2.2 Wastewater
The City’s wastewater system consists of eight pump stations, a collection system, and
Wastewater Treatment Plant (WWTP)40. The Wastewater Treatment Plant Division of the
City’s Public Works Department operates and maintains all the wastewater pumping and
treatment facilities and equipment. Routine maintenance is performed daily on the
wastewater pumping and treatment facilities. Wastewater connection fees, for new
sewer hook-ups, and bond monies are used to pay for wastewater system capital
improvements. Currently, wastewater services have not been extended to the former
PALCO mill site or Alton areas which are planned for future development. The
development proposals previously described will require extension of wastewater
services.
The 2018 Sewer System Management Plan (SSMP) for the City of Fortuna focuses on
proper management, operation, and maintenance of all parts of the sanitary sewer
system. Included in the 2018 SSMP are the following goals41:
1. Maintaining or improving the condition of the collection system infrastructure in
order to provide reliable services now and into the future;
2. Cost-effectively minimizing infiltration/inflow (I/I) and provide adequate sewer
capacity to accommodate design storm flows;
3. Minimizing the number and impact of sanitary SSOs that occur;
4. Preventing unnecessary damage to public and private property;
5. Using funds available for sewer operations in the most efficient manner;
39 https://www.friendlyfortuna.com/departments/finance/water_sewer_services/water_billing_info.php
40City of Fortuna MSR. Humboldt LAFCo. 2008
41 City of Fortuna Sewer System Management Plan. July 1, 2018.
Ch. 5 – Services & Infrastructure [28]
6. Working cooperatively with local, state, and federal agencies to investigate the
causes of, minimize, and mitigate the impacts of SSOs;
7. Meeting all applicable regulatory notification and reporting requirements;
8. Being available and responsive to the needs of the public to prevent and restore
interruptions in service and to minimize public health and property impacts
related to SSOs;
9. Implementing regular, proactive maintenance of the system to remove and
control roots, debris, fats, oils and grease (FOG) that may cause SSOs;
10. Prioritizing renewal and replacement of wastewater collection system facilities to
maximize their useful life and optimize capital expenditures; and
11. Maintaining the SSMP, which will serve as a reference for the City’s sanitary sewer
system management practices.
The 2018 SSMP covers a portion of the City’s collection system and includes inflow and
infiltration (I&I) recommended improvements, which are discussed further in the section
titled “Wastewater System Planned Upgrades.” The City anticipates continuing to
complete a similar plan and initiating projects for the system over a 10-year period until
the entire I&I system has been analyzed, projects identified, and added to the City’s CIP.
Collection System
Approximately 90% of the connections to the collection system are residential and
commercial users; the remaining 10% are industrial42. The City’s wastewater collection
system extends throughout most of the areas within the City Limits and is considered
generally adequate to serve the existing developed areas of the city. Palmer Creek CSD
also connects into the city’s treatment system. Wastewater flows are measured at the
headwork’s structure within the wastewater treatment plant (WWTP) and includes the
Palmer Creek CSD flows, which are metered separately for billing purposes.
The City’s collection system ultimately feeds into two main lines: one gravity main line and
one force main line43. The gravity main line is a 15-inch line located at Loni Drive. The
second main line is a 12-inch force main. This force main, ties into the California
Conservation Corps (CCC) Wet Well Pump Station force main on Alamar Way. This force
main transfers the flows north along Dinsmore Drive to the WWTP.
There are nine city owned pump stations in the collection system, which include the
Strongs Creek, CCC, North Main Street, Rohnerville Road, Rancho Buena Vista, Rundells,
Kenwood Meadows/Laurelwood, Astor, and Nob Hill pump stations44. These pump
stations are equipped with pumps ranging in size from 2 to 8 inches that provide the
majority of the pumping capacity for average daily flow conditions along with secondary
pumps for additional capacity during peak flow conditions.
42 Wastewater Treatment and Effluent Percolation System Upgrade Project. GHD. April 2020
43 City of Fortuna MSR. Humboldt LAFCo. 2008
44 Ibid
Ch. 5 – Services & Infrastructure [29]
Treatment Facility
The City’s WWTP, originally constructed in 1974, is regulated under the North Coast
Regional Water Quality Control Board (NCRWQCB) and operates under waste discharge
requirements issued by the NCRWQCB in Order No. R1-2017-0005, effective November 1,
201745. Treatment processes include screening and grit removal, primary treatment,
secondary treatment, mixed liquor recycle for biological nutrient removal (BNR), sludge
thickening, anaerobic digestion, electrical cogeneration, solids dewatering, composting,
side stream equalization, and effluent disinfection46. Treated and dechlorinated effluent
is currently discharged to the percolation ponds during dry weather (May 15-September
30) and to Strongs Creek during the wet weather season (October 1-May 14). However,
the use of the percolation ponds will be discontinued after construction of a new
percolation field on the west side of the Eel River.
During the dry season of 2019 (May-October), the average dry weather flow (ADWF) was
0.827 MGD. During the wet season of 2019 (January-April and November-December), the
average influent flow was 1.498 MGD47 which is approximately 40% of the plant’s design
capacity. Under extreme influent flows, some of the influent is diverted to flow
equalization ponds. This allows the plant flow to remain at a controlled, uniform rate
below the plant’s current wet weather operational capacity of 3.8 MGD. Once flows
subside, this overflow volume is metered back into the plant influent for proper
treatment and disposal.
In recent years, the City has developed a long-term solids handling plan for disposing of
sewage sludge. The process involves composting biosolids generated from the WWTP
and providing it to residents and agricultural producers for re-use as a soil conditioner. All
biosolids produced are disposed of in this manner on a regular basis.
WWTP upgrades and expansion were completed in June 200748. These improvements
included upgrading the existing hydraulic capacity of the plant and adding new unit
operations including a new anaerobic digester; a secondary clarifier; a composting solids
handling system; and odor control biofilters. The hydraulic capacity of the plant was
increased with the addition of a new secondary clarifier and a new discharge pipe. A
new operations building, and a grit handling and headwork’s system were also
constructed, as well as co-generation capability which converts digester gases into
electricity to supplement the electrical power needed to operate the WWTP.
The Compliance Project to upgrade the communications system at the WWTP, which
began in 2017, is complete49. The upgrade included new Programmable Logic Controls
(PLCs), installation of network cable, modifications to the SCADA system, and remote
access. These modifications, in addition to the installation of equipment for continuous,
real-time monitoring of the disinfection process, allows for quicker, more efficient
45 Wastewater Treatment and Effluent Percolation System Upgrade Project. GHD. April 2020
46 City of Fortuna Wastewater Treatment Plant 2019 Annual Report. February 6, 2020.
47 City of Fortuna Wastewater Treatment Plant 2019 Annual Report. February 6, 2020.
48 Ibid
49 City of Fortuna Wastewater Treatment Plant 2019 Annual Report. February 6, 2020.
Ch. 5 – Services & Infrastructure [30]
notification and control of chlorine residuals in the contact basin and the final effluent.
Current capacities for the system are summarized in Table 5-4.
Table 8: Fortuna WWTF Design Flow and Loads50
Type of Flow (units) Design Capacity
Average Annual Design Flow (MGD) 1.5
Maximum Month Design Flow (MGD) 421.3
Influent Average Annual BODs (PPD) 558
Influent Average Annual TSS (PPD) 957
Wastewater Rates
The rates listed below were established in Fiscal Year 2010-201151. Rates are determined
by property use and include a base charge for up to 500 cubic feet and then a usage
fee for each additional 100 cubic feet. The City is expected to complete rate studies
and propose a rate increase within the next 1-2 years for wastewater services.
Through contractual agreement, the City of Fortuna receives wastewater from the
Palmer Creek CSD which is then processed at City’s wastewater treatment plant before
being discharged to one of three discharge points. The current wastewater agreement
requires City approval for new connections in the CSD. Monthly flow restricts new
connections, which cannot exceed 42,120 gallons per the average day dry month
(average flow occurring during the months of June-September) or Peak Wet Weather
Monthly Flow capacity of 2,527,200 gallons per month52. This information is tracked by the
CSD. The City is in the process of doing a rate study and updating the agreement with
Palmer Creek CSD with the new agreement going into effect by the end of 202153.
Table 9: Fortuna Wastewater Service Rates54
Charge Type Monthly Charge
Inside City Rate Residential: Residential dwelling units Base: $38.75
including single family apartments
Usage: $8.61/100ft3
Light Commercial: Business that produce Base: $38.02
effluence with a strength factor of less than
Usage: $8.45/100ft3
200 mg/l
50 City of Fortuna Wastewater Treatment Plant 2019 Annual Report. February 6, 2020.
51 City of Fortuna, Finance Department, Personal Communication. October 5, 2020.
52 Palmer Creek CSD and City of Fortuna Wastewater Treatment Agreement 1989.
53 City of Fortuna, Public Works Department, Personal Communication. September 24, 2020.
54 https://www.friendlyfortuna.com/departments/finance/water_sewer_services/water_billing_info.php
Ch. 5 – Services & Infrastructure [31]
Medium Commercial: Business that produce Base: $49.02
effluent with a strength factor of between
Usage: $10.89/100ft3
200 mg/l and 500 mg/l
Heavy Commercial: Business that produce Base: $96.69
an effluent with a strength factor of greater
Usage: $21.49/100ft3
than 500 mg/l
Industrial: Includes any industry where the Base: $767.56
waste is difficult to treat because of strength,
Usage: $29.64/100ft3
flow or solids
Palmer Creek CSD Base: $168.02
Usage: $6.49/100ft3
Outside City Rate Outside the City limits service area, the rate 1.5 x service rate
charged shall be one and one-half (1.5) times within City limits
the rate for service within the City limits.
Wastewater System Planned Upgrades
During 2019, the WWTP experienced violations related to disinfection byproduct limits,
nitrogen limits, challenges with disinfection, and an exceedance of required chlorine
residual in the effluent55 due to conditions at the time of sampling, increased rainfall, and
plant process controls. The plant will continue to experience higher nitrate levels until the
plant is upgraded, which is expected to occur within the next four years. Besides these
violations, City Staff reports the WWTP functioned well because of careful control of
operational processes and current plant staff. City of Fortuna’s utilities crews continue to
inspect sanitary sewer manholes and other infrastructure for I&I throughout the year.
Routine maintenance, flow-monitoring of recognized problematic areas, and video-
inspection of the City’s collection system is ongoing. Staff continues to work on
implementing a procedure for rating the collection system and prioritizing maintenance
and repairs. Data from the City’s 2018 Sanitary Sewer Evaluation Survey is used to
formulate a maintenance plan and provide information for sewer collection projects in
the City’s Capital Improvement Plan.
The following projects were identified in the 2020-2021 CIP with a total cost of $2,800,00056.
NPDES Compliance Project
o
Wastewater Treatment Digester Maintenance Project
o
Sanitary Sewer Lining Project
o
Compost Area Expansion Project
o
55 City of Fortuna Wastewater Treatment Plant 2019 Annual Report. February 6, 2020.
56 City of Fortuna CIP FY 20-21
Ch. 5 – Services & Infrastructure [32]
Strongs Creek Screening Project
o
East Downtown Sewer Replacement Project
o
12th Street Sewer Capacity Project
o
Hilltop Sewer Main Project
o
Wastewater Treatment and Effluent Percolation System Upgrade Project
Currently, the City is upgrading its treatment and disposal systems to comply with
environmental regulations set by the Regional Water Quality Control Board. According
to City Staff, once completed, the treatment and disposal system will comply with
environmental regulations and have capacity for at least the next 15 years57.
The Regional Board is requiring the City to implement an alternative method of
summertime effluent disposal due to potential connectivity with the Eel River during
periods when river discharge is not allowed58. The Regional Board is also requiring the City
to upgrade the treatment system to improve treatment for ammonia and nitrate.
The City is required to meet effluent targets per the NPDES permit issued by the Regional
Board. In order to meet updated targets, the City is proposing to add Biological Nutrient
Removal (BNR) to the existing treatment process, which would include converting the
aeration basins to a Modified Ludzack Ettinger (MLE) process, as well as modifying the
waste activated sludge (WAS) and filtrate equalization (EQ) basins.
The City obtained funding through the Clean Water State Revolving Fund (CWSRF) for
planning of the Wastewater Treatment and Effluent Percolation System Upgrade Project
which will address these issues and construct a new disposal system to replace the historic
use of the percolation ponds59.
Under the proposed project, treated effluent would be pumped from the existing
treatment plant under the Eel River through a new, directionally-drilled pipeline. A new
pump station and piping modifications at the treatment plant would be required, along
with a network of subsurface percolation pipes at the new percolation site.
The new effluent percolation system would be located on the western side of the Eel
River, opposite Fortuna. The nearest roads are Pleasant Point Road and Renner Lane. The
new percolation field would be located on APN 106-091-030 and 106-091-040.
Construction is anticipated to occur over an eight-month construction window planned
to commence during a single construction season (2021, 2022, or 2023)60.
The proposed project does not include components that would directly support
unplanned population growth, such as new housing, roads, utilities, or other
developments and will not increase overall system capacity.
57 City of Fortuna, Public Works Department, Personal Communication. August 27, 2020.
58 Ibid
59 Ibid
60 Wastewater Treatment and Effluent Percolation System Upgrade Project. GHD. April 2020
Ch. 5 – Services & Infrastructure [33]
5.2.3 Stormwater Drainage and Flood Control
Operations
The City of Fortuna Public Works Department is responsible for the management,
maintenance and operation of the storm drain system which includes 300 drainage
structures, several miles of drainage ditches and stream reaches, and pipeline facilities.
The Public Works Administrative Division is responsible for management of the system and
the General Services Division is responsible for maintenance, including regular stream
clearing activities61. The City is also part of the North Coast Stormwater Coalition which
is a group that works collaboratively with Northern California city and county
governments to reduce stormwater pollution and protect local waterways.
The City discharges storm water to the Eel River and is therefore subject to National
Pollution Discharge Elimination System (NPDES) Phase II regulations as an MS4. The
Municipal Storm Water Program regulates storm water discharges from municipal
separate storm sewer systems (MS4s) throughout California. U.S. EPA defines an MS4 as a
conveyance or system of conveyances (including roads with drainage systems,
municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm
drains) owned or operated by a State (40 CFR 122.26(b)(8)).
The City holds a Phase II NPDES General Municipal Permit for these point-source
discharges. The City’s Storm Water Management Program (SWMP), approved by the
Regional Water Quality Control Board in January 2006, was adopted by the City Council
in March 2006. The SWMP defines six minimum control measures and corresponding Best
Management Practices (BMPs) to be implemented over the five-year program. These
include: (1) Public education and outreach; (2) Public involvement/ participation; (3)
Illicit discharge detection and elimination; (4) Construction site storm water runoff control;
(5) Post construction storm water management; and (6) Pollution prevention/good
housekeeping for municipal operations62. The SWMP has not been updated since 2006
and the City continues to operate with these six principles in mind.
Stormwater Rates
Stormwater monthly user charges are based on a range of square footage and property
type. For example, a single-family residence under 15,000 square feet will pay $0.55 each
month. In addition to rates, the City maintains a Storm Drain Maintenance fund which
comes from development projects that include drainage development fees.
61 City of Fortuna MSR. Humboldt LAFCo. 2008.
62 City of Fortuna General Plan 2030.
Ch. 5 – Services & Infrastructure [34]
Table 10: Fortuna Stormwater Drainage Rates63
Charge Type Monthly Charge
Residential
<15,000 square feet $0.55
>15,000 square feet $0.88
Multi-family
<15,000 square feet $0.45
>15,000 square feet $0.45
Commercial
<15,000 square feet $1.75
>15,000 square feet $2.81
Industrial
<15,000 square feet $1.65
>15,000 square feet $2.65
Infrastructure, Facilities and Services
A Storm Drain Master Plan was prepared by the City in July 2005, which provides a
detailed overview of the existing system, and recommendations for improving storm drain
system deficiencies64. According to the 2005 Storm Drain Master Plan, the majority of the
storm drain system within the City Limits consists primarily of Reinforced Concrete Pipe
(RCP) and corrugated metal pipe (CMP) storm drains. In the rural areas surrounding the
city, the storm drainage system consists largely of roadside ditches and culverts.
Planned Upgrades
The 2005 Storm Drain Master Plan is organized according to the six major natural
drainages located within the city limits. These drainages include the North Fortuna
Drainage; Rohner Creek Drainage; Hillside Creek Drainage; Strongs Creek Drainage;
Jameson Creek Drainage; and Mill Creek Drainage (Figure 5).
The hydraulic analyses provided in the 2005 Master Plan identified 79 drainage structures
within the City of Fortuna that were considered deficient (i.e., undersized for the 25-year
design flow). The identified deficiencies were combined into 55 recommended
improvement projects with an estimated total implementation cost of approximately
$14.8 million. In 2007, the Fortuna Redevelopment Agency through the Fortuna Public
Financing Authority issued over $12.6 million in revenue bonds to finance the construction
or remediation of various infrastructure projects.
The City used state grants (California Department of Water Resources Proposition 1E
Stormwater-Flood Management), former Redevelopment Agency loan bond proceeds,
and storm drainage funds to complete almost $6.5 million in improvements to the Rohner
Creek Flood Control and Riparian Habitat Improvement Project in fiscal year 2018. This
project determined the most feasible option to construct channel improvements in the
63 City of Fortuna Fee Schedule Fiscal Year 2019-2020.
64 City of Fortuna MSR. Humboldt LAFCo. 2008
Ch. 5 – Services & Infrastructure [35]
stream and/or a bypass channel to decrease flooding of Rohner Creek during a 100-year
flood event. The objective of the project is to manage stormwater runoff to reduce flood
damage and where feasible, provide other benefits, such as water quality improvements
and ecosystem restoration65.
Figure 8: Storm Drainage Areas
Following completion of this project, the City moved forward with the $2.5 million Hillside
Creek Flood Control Project, 75% of which was funded by a Federal Emergency
Management Agency (FEMA) grant66 and the remainder by Measure E and Department
of Water Resources funds. The Hillside Creek Project was completed in fiscal year 2019-
2020 and involved replacing the culvert and grading adjoining channels67 allowing for
removal of multiple properties along the creek and a section of Fortuna Boulevard from
the flood plain. This project was identified because the banks of Hillside Creek would
overflow during a ten-year storm event68. The Public Works Department secured critical
matching funds for this project which improves flood safety and enhances the City’s
ability to withstand future 100-year flood events69.
Rohner Creek Widening Project included creek widening and habitat improvement
along Rohner Creek from Main Street to 12th Street. The need for this project was identified
65 California Bond Accountability website. Accessed September 28, 2020.
https://bondaccountability.resources.ca.gov/Project.aspx?ProjectPK=8475&PropositionPK=5
66 City of Fortuna 2018-2019 Comprehensive Annual Financial Report.
67 City of Fortuna CIP FY 20-21.
68 City of Fortuna CIP FY 15-16.
69 City of Fortuna Annual Operating Budget Fiscal Year 2020-2021.
Ch. 5 – Services & Infrastructure [36]
as flooding along Rohner Creek has occurred multiple times, flooding into neighborhoods
on Fortuna Boulevard costing property owners thousands of dollars for flood insurance.
This project removed all properties within the project limits from the flood zone70 and was
completed in fiscal year 2017-201871.
Currently, the City is in the process of remapping Rohner Creek with FEMA, which will
remove properties from the flood zone72 and has a grant out for a Low Impact
Development project. Another major project recently completed includes culvert
replacement at Jameson Creek to allow for improved fish passage73.
Overall, stormwater infrastructure is nearing the end of its life cycle, meaning the City
installs minor replacements every year for failing/deteriorating storm drain pipes and is on
a continual maintenance cycle as they encounter issues in the system and attempt to
keep up with improvements. The City is nearing completion of projects identified in the
2005 Storm Drain Master Plan74. As such, the City is planning to use a FEMA grant to
conduct a stormwater conditions assessment, which will act as an updated Storm Drain
Master Plan. This will involve surveying the existing stormwater system to quantify
conditions and establish needed improvements for a comprehensive update to the
City’s stormwater infrastructure.
Capital Improvement Projects
The following stormwater and flood control projects were identified in the 2020-2021 CIP
with a total cost of $3,852,99075.
Citywide Storm Drain Maintenance Project
o
Prop 1 LID 12th Street Project
o
Storm drain Infrastructure Vulnerability Assessment Project
o
Jameson Creek Culvert Replacement Project
o
12th Street Storm Drain Project
o
South 15th Storm Drain Project
o
Home Avenue Storm Drain Project
o
Renner Drive Culvert Project
o
P Street Storm Drainage Project
o
Kenmar Storm Drain Project
o
70 City of Fortuna CIP FY 15-16.
71 City of Fortuna CIP FY 18-19.
72 City of Fortuna, Public Works Department, Personal Communication. September 24, 2020.
73 City of Fortuna CIP FY 20-21.
74 City of Fortuna, Public Works Department, Personal Communication. September 24, 2020.
75 City of Fortuna CIP FY 20-21
Ch. 5 – Services & Infrastructure [37]
Flood Control District
The Humboldt County Flood Control District (FCD) was formed by the state legislature in
1945 for broad purposes including control and conversion of flood and storm waters. The
Board of Supervisors is designated and empowered to act as the governing authority of
the Flood Control District. Currently, the FCD serves one ongoing function, which is to
administer funds for flood-related projects in the Fortuna area. A sub-zone known as Sub-
Zone 1-1 of the FCD was formed in 1956 for the watersheds of Rohner Creek and Strongs
Creek in the Fortuna area. Approximately 0.6% of property taxes collected in Sub-Zone
1-1 is directed to County fund 2840, where it accrues until a request is made, normally by
the City of Fortuna, to fund specific flood-related projects.
In 2012, the City of Fortuna initiated the Rohner Creek Flood Control Habitat and Seismic
Improvement Project upon receiving a Prop 1E Grant from the Department of Water
Resources. The City requested $190,000 from the County to reimburse costs associated
with the project since it lies within the FCD76. Historic modifications, channelization, urban
encroachments into the lower reaches of Rohner Creek contributed to the increase in
flood frequency throughout the City and degradation of in-stream habitat.
Eel River Levee
The Eel River Flood Control Project (levee) at Sandy Prairie is located along the right bank
of the Eel River adjacent to the City’s Riverwalk area, with extensions along Strongs Creek
and the Van Duzen River, near the City of Fortuna. The levee was constructed by the
Army Corps of Engineers and completed in 1959. During the 1964 flood, the levee was
breached near the location of the present-day Fortuna River Lodge conference center.
The total length of levee is approximately four miles77. The County accepts operation and
maintenance of the levee, which is funded through the County’s General Fund. The
County and the City have been informally collaborating regarding matters related to
levee system maintenance, with the City taking responsibility for levee system
maintenance within city limits. The County and City have discussed a memorandum of
understanding to formalize this agreement, but nothing has been established yet. The
County recognizes the recreational value of the levee but does not manage it for
pedestrian use because there currently is not budget for those amenities. The City has a
vision of linking connector trails to the levee for river access78. It is recommended that a
memorandum of understanding be formalized in order to better define operational and
maintenance responsibilities.
Groundwater Sustainability Planning
The Sustainable Groundwater Management Act (SGMA) was signed into law in
September 2014 and applies to designated medium and high priority basins in the state.
The Eel River Valley groundwater, which includes the City of Fortuna, is the medium-
76 Humboldt County Staff Report, Expenditure Authorization for Humboldt County Flood Control District. September 6,
2016.
77 County of Humboldt website: https://humboldtgov.org/2485/Levee-Management
78 County of Humboldt, Public Works Department, Personal Communication. October 2, 2020.
Ch. 5 – Services & Infrastructure [38]
priority basin in Humboldt County. The City is the largest municipal water supplier in the
basin and has been actively involved in the Eel River Valley Working Group since 2015.
On November 14, 2019, Humboldt County submitted a grant application to the California
Department of Water Resources (DWR) to obtain a planning grant for the Eel River Valley
Groundwater Sustainability Plan and Monitoring Well Installation Project79. The proposed
project includes stakeholder outreach and engagement, data collection and analysis,
enhancement of the hydrogeological conceptual model and water budget, numerical
modeling of the groundwater-surface water system, and document preparation.
On May 5, 2020, the Humboldt County Board of Supervisors adopted a resolution forming
a Groundwater Sustainability Agency (GSA) for the Eel River Valley groundwater basin. A
Groundwater Resources Advisory Committee will serve to advise the Board on
groundwater matters in the Eel River Valley and provide guidance and assistance to
Public Works in developing the GSP. A Request for Proposals for professional consulting
assistance to develop a GSP for the Eel River Valley groundwater basin was issued on
May 5, 2020. A consultant has been selected for the project and work began in August
2020 with project completion scheduled by January 2022.
5.2.4 Streets and Transportation
Operations
The General Services Division of the City of Fortuna’s Public Works Department is
responsible for the street system, which includes maintenance of the streets, traffic
control signs, the roadway striping and pavement markings, and street sweeping
programs. The Division also handles roadside maintenance, as well as maintenance and
repair of the city’s streetlight system and traffic signals.
Infrastructure, Facilities and Services
Fortuna’s street system includes approximately 52 miles of streets and 400 traffic control
signs80. The approximately seven miles of Highway 101 that run though the city are
maintained by Caltrans.
Demand and Capacity
Level of Service (LOS) is a qualitative indicator of the relative ease or congestion of traffic
movement; with Level ‘A’ representing free flow conditions and Level ‘F’ representing
conditions where traffic is at or over roadway capacity. The City of Fortuna’s existing
adopted LOS standard is contained in the 2030 General Plan Circulation Element. This
current standard allows for a minimum LOS of ‘A/B’ for Main Street and LOS range of ‘A-
C’ for all other roadways.
As part of the General Plan Update, an analysis was performed on 26 critical intersections.
Twenty-two of the 26 intersections studied operated at an acceptable LOS.
79 County of Humboldt website: https://humboldtgov.org/2489/Groundwater
80 City of Fortuna MSR. Humboldt LAFCo. 2008
Ch. 5 – Services & Infrastructure [39]
Planned Upgrades
As a result of the critical intersection analysis performed as part of the General Plan
Update, it was determined that the following intersections are operating below the
current LOS standard contained in the 2030 General Plan Circulation Element81:
• Intersection #3, the westbound left-turn at North Fortuna Boulevard/Main
Street-Rohnerville Road, which is operating at LOS F during the evening peak
hour.
• Intersection #15, the southbound approach at Kenmar Road/Highway 101
South Ramps, which is at LOS E during the evening peak hour.
Intersections #19 (Future extension of Redwood Way through the Mill District to Newburg
Road Northbound Fortuna Boulevard), #20 (Fortuna Blvd/Strongs Creek Westbound), and
#21(Redwood Way/Proposed Strongs Creek Southbound Strongs Creek Approach) were
not evaluated because they do not exist yet.
When the General Plan Update was conducted, LOS was the metric for identifying and
mitigating transportation impacts. As of July 1, 2020, statewide implementation of Vehicle
Miles Traveled (VMT) is the new metric for identifying and mitigating transportation
impacts within the California Environment Quality Act (CEQA). VMT has been
implemented as part of Senate Bill 743 to “more appropriately balance the needs of
congestion management with statewide goals related to infill development, promotion
of public health through active transportation, and reduction of greenhouse gas
emissions.” When the City conducts their next General Plan Update, VMT will likely be
used. There are regional efforts currently taking place to introduce VMT and provide
technical assistance in using this metric in rural Humboldt County.
Overall, the City is shifting towards more walkable, bike friendly, and transit-oriented
design. According to City Staff, studies have been completed for several areas focusing
on safety and capacity during and following completion of the General Plan process in
2010. The City has also completed several smaller safety projects, a Safe Routes to School
project, and roadway maintenance and rehabilitation82. The City was awarded Safe
Routes to School (SRTS) funding in 2014 for pedestrian and bike improvements near
Ambrosini Elementary School, Toddy Thomas Middle School, and Redwood Preparatory
Charter School. Improvements focused on adding clearly marked crosswalks, continuous
sidewalks, marked bike paths, improved signage, and street painting for driver visibility.
This project was completed in Summer 2017. The South Fortuna Elementary School SRTS
project is currently in the design stage and improvements will alter the traffic striping on
Newburg Road, and improve pedestrian and cyclist facilities on Newburg Road and in
the Lawndale Subdivision.
In 2014, the City completed the John Campbell Memorial Greenway and Strongs Creek
Trail Final Master Plan to provide convenient east-west connection from the southern end
81 City of Fortuna General Plan 2030
82 City of Fortuna, Public Works Department, Personal Communication. August 27, 2020.
Ch. 5 – Services & Infrastructure [40]
of the Riverwalk area to the Headwaters Forest Reserve and City destinations in between.
In 2016, the City completed the Highway 101 Fortuna Downtown and Riverwalk Area
Complete Streets and Connectivity Planning Study to provide an assessment of design
alternatives to improve connectivity between Highway 101 and important destinations in
the City, including downtown and the Riverwalk Area83.
As identified by City Staff, three primary intersections remain a concern for capacity and
safety: Highway 101 and 12th Street Interchange, Highway 101 and Kenmar Road
Interchange, and 12th Street and Newburg Intersection. These intersections are
outdated, confusing for users, lack non-motorized connectivity, and are expected to
exceed acceptable LOS with the City’s planned growth. The City has completed studies
of these intersections and conceptual designs for implementation. Funding for
preliminary design and permitting is currently only available for the Kenmar intersection.
Continued development on the edges of the City may lead to increased traffic causing
further congestion in these problem areas. As noted previously, the Kenmar Road
Interchange sees large amounts of congestion during commute times due to increased
development in the southern portion of Fortuna. The City is encouraged to continue
assessing these problem areas, consider alternative modes of transportation, and explore
infill options that may reduce reliance on the rural road network.
Capital Improvement Projects
The CIP serves as the City’s maintenance program for its roadways. The Pavement
Management Program completed by HCAOG serves as the City’s needs assessment for
paved roadways.
The following projects were identified in the 2020-2021 CIP with a total cost of $4,324,00084
Citywide Paving Project SB1 Paving Projects
o o
Citywide Slurry Project Kenmar Interchange
o o
Improvement Project
Citywide Concrete Project
o
ADA Barrier Removal Project
South Fortuna Elementary School o
o
P Street Paving Project
Local Road Safety Plan o
o
8th Street Slurry Project
Redwood Way Reconstruction o
o
Project
83 City of Fortuna Highway 101, Fortuna Downtown and Riverwalk Area Complete Streets and Connectivity Planning
Study. GHD. November 4, 2016.
84 City of Fortuna CIP FY 20-21
Ch. 5 – Services & Infrastructure [41]
5.3 Parks and Recreation
5.3.1 Parks, Recreation, Museum, and Transit
Operations
The Parks and Recreation Department has three divisions, which include Parks,
Recreation, and the Depot Museum. The department is administered by the Parks
Director and assisted by administrative staff, maintenance workers, and a part-
time/seasonal staff, which includes recreational program supervisors, leaders, and aides
to run recreational programs.
The Parks Division is responsible for the maintenance and landscaping of the City Parks,
Fortuna Boulevard Medians, Monday Club, River Lodge, Main Street planters, City Hall,
Library and Chamber of Commerce85. The department is also responsible for
maintenance of public parking lots and the operation of the Senior/Disabled Bus.
The Recreation Division is responsible for the administration of city leisure programs, the
reservation and scheduling of all park facilities, daily reservations and dispatching of
drivers for the Senior/Disabled Bus Service and secretarial support for the Park and
Recreation Commission. Park Staff assist the Depot Museum staff with various duties, in
addition to building repairs, maintenance and improvements made to the facility.
Infrastructure, Facilities and Services
Rohner Park: Rohner Park is located in the center of Fortuna’s downtown district. The 55-
acre multi-use park serves as a hub of community activities with recreational structures
and facilities including, but not limited to: the Depot Museum, the Firemans Pavilion, Park
office, two room Recreational Hall, Rodeo Arena, cookshack with covered patio, three
Little League baseball fields, batting cages, a recreation softball field, an outdoor
basketball court, horseshoe pits, two playgrounds, a pistol range, public restrooms, three
bocce ball courts, and a community forest86.
Newburg Park: Newburg Park is a 24-acre community park located on the corner of
Rohnerville and Newburg Roads87. Recreational facilities in Newburg Park include two
hardball fields, three softball diamonds, one regulation soccer field, and seven additional
soccer fields, a picnic area, a playground, an all-weather walking path, public restrooms,
paved bike park/pump track, parking and a large expanse of open space.
Local School Grounds: Many of the public schools in Fortuna have play and recreational
facilities. The Parks and Recreation Department has a shared agreement with Fortuna
High school and elementary schools to use gym and school field facilities with reciprocal
use rights for school teams to use Rohner and Newburg Parks for soccer, baseball and
85 City of Fortuna MSR. Humboldt LAFCo. 2008
86 City of Fortuna MSR. Humboldt LAFCo. 2008
87 Ibid
Ch. 5 – Services & Infrastructure [42]
certain track and athletic events. This partnership allows the community to maximize use
of available parks and facilities.
Mini/Pocket Parks: There are two mini/pocket parks in Fortuna. These include the
Chamber Park, approximately 2,500 square feet, located between the Chamber of
Commerce building and the Fortuna Library88. The second park, named Walk and
Overlook Park is located near the River Lodge and is approximately 4,000 square feet in
size.
River Lodge: River Lodge is a meeting/conference facility with approximately 13,000
square feet of meeting spaces, which is rented out for community meetings, events, and
private functions89.
The Monday Club: The Monday Club built in 1923, is currently rented out for social and
musical events. The club was recently renovated; renovations included a new roof,
heating system, paint, electrical, ADA compliant restrooms, ADA accessible ramp,
remodeled front porch, refinished floors, and upgraded doors and windows. The
renovations took place from 2010-201990.
Demand, Capacity, and Planned Upgrades
Fortuna has 75 acres of community parkland, an average of 6.7 acres per 1,000 residents.
The City of Fortuna does not currently have a parkland standard. In 1975, the state
adopted the Quimby Act which is designed to ensure adequate open space acreage
in jurisdictions adopting Quimby Act standards (e.g., 3 – 5 acres per 1,000 residents). This
is currently being met in the city.
The City conducted several meetings and identified improvements desired by the public
at the City’s Newburg Park. Improvements include additional parking, additional soccer
fields, outdoor pickle ball and basketball courts, softball field upgrades, skate park, and
trails. The purchase of over 8 acres adjacent to the park will be necessary to
accommodate the proposed improvements. Additionally, an aquatic facility has been
identified as a community need and the City is working with the Rohner Community
Recreation and Park District to identify a mechanism to fund and maintain an aquatic
facility.
The Parks Department was able to secure funding for replacement roller skates as well
as grant matching funds to acquire additional parkland and enhance the trail system91.
The FY 2020-2021 CIP does not allocate funds towards Parks and Recreation projects
due to COVID-19 cutbacks92.
88 Ibid
89 Ibid
90 City of Fortuna CIP FY 10-11, FY 11-12, FY 17-18, FY18-19
91 City of Fortuna Annual Operating Budget Fiscal Year 2020-2021.
92 City of Fortuna CIP FY 20-21
Ch. 5 – Services & Infrastructure [43]
Rohner Community Recreation and Park District
The Rohner Community Recreation and Park District is an independent special district
that includes both the City of Fortuna and unincorporated areas surrounding the City.
The District is governed by a five-member Board of Directors with three members
appointed by Fortuna City Council and two members appointed by the Humboldt
County Board of Supervisors. The RCRPD was originally formed for the purpose of
overseeing the planning, acquisition and construction of a community swimming pool. In
1969, the District was unsuccessful in receiving voter approval of a bond measure as well
as federal grant funds for construction of the public swimming pool facility. The RCRPD
oversees annual funds that are levied from property taxes. Currently the district has no
staff and is largely supported by the City of Fortuna for administrative functions. The
District Board was re-established in 2018 and has been meeting regularly. Most recently,
the District is looking to develop and submit a Proposition 68 grant application to support
construction of an aquatic facility in the Fortuna area.
5.4 Community Development
5.4.1 Planning and Building
The Community Development Department coordinates and manages the activities of
the Building and Planning Divisions, including issuing building permits and planning
permits, and overseeing a variety of development activities within the City. The
Department provides support to the public and works directly with the City’s citizens,
developers, businesses, other governmental agencies, and City departments.
The Department manages the City’s orderly growth and protects public health and
safety by implementing and enforcing the zoning and building codes, General Plan
policies, housing policies, the California Environmental Quality Act (CEQA), and
coordinating economic development and other long-range planning activities.
5.5 Police and Emergency Services
5.5.1 Law Enforcement
Operations
Police protection services, traffic patrol, and animal services within the Fortuna City limits
are provided by the Fortuna Police Department (FPD). The Humboldt County Sherriff
Department provides law enforcement services within the unincorporated areas
surrounding the city. The California Highway Patrol provides traffic patrol along the
Highway 101 corridor within the city limits. The FPD does occasionally assist with calls
outside the city limits when requested under existing mutual aid agreements between
the city and the county.
Ch. 5 – Services & Infrastructure [44]
FPD staffing has remained relatively the same for the past 35 years, although the
population has continued to increase93. The Police Department consists of 29 employees
with 17 sworn positions including one police chief, one lieutenant, four sergeants, one
detective, one problem-oriented officer, one school resource officer, and eight police
officers94. In addition, the department employs 12 non-sworn employees including one
full-time and one part-time field community service officers, five full-time and one part-
time dispatchers, one records clerk, one part-time kennel attendant, and one part-time
code compliance officer.
Infrastructure, Facilities and Services
The FPD temporarily operates out of two locations, one site at 621 11th Street and the
other at 2600 Rohnerville Road to practice physical distancing during COVID-19. The
long-term goal is to operate out of a single facility at 2600 Rohnerville Road. The FPD has
two holding cells for persons awaiting transfer to the Humboldt County jail for questioning.
The FPD is unique in that they provide first response for medical calls in Fortuna, versus the
majority of other cities where the Fire Department responds to medical calls95. Every
police unit is equipped with oxygen, a full medical bag, and an automated deliberator.
The FPD responded to 21,849 calls in 2019, with an average response time of four minutes
and thirty-six seconds (4:36). The FPD Dispatch Center handles all 911 calls for the Eel
River Valley. They handle calls for the Ferndale, Rio Dell and Fortuna Police Departments
in addition to dispatch call for the Fortuna Volunteer Fire Department.
Currently, there is no department report or master plan for the Fortuna Police
Department. The department is fully staffed and the primary need identified by the
department is a larger facility to meet long term space needs. The City has purchased
property for a future facility but does not currently have a funding plan for the long-term
needs of the department.
The FY19-20 CIP allocated $40,000 towards the Police Department Front Counter Safety
Project96. The FY 20-21 CIP allocates $55,000 towards the Police Facility Replacement
Project97, which includes remodeling the existing building at 2600 Rohnerville Road as an
interim police facility.
Fiscal year 2020-21 Budget eliminated the police office supervisor position (decrease of
$66,320) and decreased the police department remodel (decrease of $267,000) due to
COVID-19 budget cutbacks. The police department remodel will be brought back later
in fiscal year 2020-21 for consideration once a cost study is complete98.
Demand and Capacity
93 City of Fortuna MSR. Humboldt LAFCo. 2008
94 City of Fortuna. Department Organization. Accessed August 7, 2020.
https://www.friendlyfortuna.com/departments/public_safety/department_organization.php
95 Ibid
96 City of Fortuna CIP FY 19-20
97 City of Fortuna CIP FY 20-21
98 City of Fortuna FY 2020-21 Staff Report. June 15, 2020.
Ch. 5 – Services & Infrastructure [45]
The Fortuna Police Department has approximately one officer per 1,514 residents. In
2007, the City of Fortuna through the Fortuna Public Financing Authority issued over $2
million in revenue bonds to finance the acquisition and construction of a new police
facility99. In 2017, the City paid off the remaining principal balance on the bond because
it was determined to be unfeasible to construct a new police facility with the remainder
of $1 million after the site was acquired100. The City returned all unspent funds and paid
off the remaining principal balance. The City purchased property at 280 12th Street, but
ultimately found it too costly for the reason stated above and sold the property in 2019.
On July 15, 2019, City Council directed staff to negotiate and enter into a purchase
agreement for parcels at 2600 Rohnerville Road and 2650 Rohnerville Road as an
alternate location for future use as a police facility. Staff entered into a purchase
agreement for both properties101.
5.5.2 Emergency Services
Fire Protection Services
The Fortuna Fire Protection District (FPD) provides fire protection services, including fire
prevention, public education, preparedness and emergency response to the City of
Fortuna and the outlying communities of Alton, Hydesville, Metropolitan, Fernbridge and
Palmer Creek. The area encompasses 29 square miles with a population of approximately
15,000102. The Fortuna FPD is staffed by the Fortuna Volunteer Fire Department. Five fire
companies work out of three fire stations within the District. Of the three stations, the
largest is centrally located on South Fortuna Boulevard, with the two smaller stations
located in Hydesville and Campton Heights. Further information on the Fortuna FPD is
provided in the Eel River-Lost Coast Regional Fire Services MSR conducted in 2016.
Emergency Planning
The City participates in the Humboldt County Operational Area Hazard Mitigation Plan
2019, the Humboldt County Emergency Operations Plan (EOP) 2015, and the City of
Fortuna’s Police Department Plan to prepare for emergencies. The City also incorporates
emergency planning into other City programs such as its Capital Improvement Program.
The City’s Capital Improvement Program includes projects which can help mitigate
potential hazards. The City will act to ensure consistency between the hazard mitigation
plan and the current and future capital improvement plans. The hazard mitigation plan
may identify new possible funding sources for capital improvement projects and may
result in modifications to proposed projects based on results of the risk assessment. The
general plan includes a “Health & Safety” element to protect the community from
unreasonable risk by establishing policies and actions to avoid or minimize the following
hazards: general, emergency response, air quality, noise, geologic and seismic hazards,
human-made hazards, flooding, wildland fires, and aircraft hazards. The City’s adoption
99 City of Fortuna MSR. Humboldt LAFCo. 2008
100 City of Fortuna, Finance Department, Personal Communication. October 5, 2020.
101 City of Fortuna City Council Packet, Regular Meeting, April 20,2019.
102 Eel River-Lost Coast Regional Fire Services MSR. Humboldt LAFCo. 2016
Ch. 5 – Services & Infrastructure [46]
of the California building and fire codes incorporated local modifications to account for
the climatic, topographic, and geographic conditions that exist in the City.
The Hazard Mitigation Plan uses long-term and short-term strategies to reduce or alleviate
loss of life, personal injury, and property damage that can result from a disaster. The plan
includes an overview of population and demographics, critical facilities, critical
infrastructure, and identifies risks for the county as a whole. It includes strategies that can
mitigate impact of hazards, such as planning, policy changes, program, and projects.
Risks evaluated in the plan include climate change, dam failure, drought, earthquake,
flooding, landslides, severe weather, tsunami, and wildfire. Among the risks assessed,
wildfire (risk rating score-45) and earthquakes (risk rating score-36) rated among the
highest risk for the City of Fortuna. Flooding has a risk rating score of 16 and is in the
medium category. Tsunami has a risk rating score 0 and therefore was not included in
any categories. According to the sea-level risk assessment, none of Fortuna’s population
or structures would be exposed103. There is a tsunami warning system for the Pacific
Ocean and local warning systems from the National Oceanic and Atmospheric
Administration and the California Governor’s Office of Emergency Services.
The City of Fortuna is located in the lower Strongs Creek watershed adjacent to the Eel
River. Many sub-watersheds consist of large portions of impervious land cover that
increase runoff volumes contributing to flooding throughout the City’s right-of-way,
residential, commercial, and industrial areas. Additionally, increased flows create erosion
and bank destabilization hazards adjacent to natural waterways. High flows can migrate
up the storm drain system and wastewater collection system, surcharging and causing
additional flooding. Water distribution pump station control panels at for the Corrosion
Control Facility and Chlorination Facility, where the City’s potable water is produced, are
located below the Eel River 100-year base flood elevation making these panels
vulnerable to flooding and failure. The pump station services the entire water distribution
system.
The County maintains the Eel River levee near the City of Fortuna which was built by the
Corps of Engineers in 1958-1959. The two worst flood events in Humboldt County occurred
in December 1955 and December 1964, both related to the Eel River, causing tens of
millions of dollars in damage and numerous facilities. There is an action item (Action HC-
19) to upgrade non-accredited federal flood control projects to meet current FEMA and
Army Corps of Engineer standards. Mitigation actions addressing these issues were
prioritized for consideration in the action plan presented in Section 6.10 of the Hazard
Mitigation Plan. The City of Fortuna would like to update the FEMA FIRMs for the Strongs
Creek and Eel River flood sources to better understand and communicate risk and
vulnerability so that project may be developed to reduce risk and vulnerability.
The EOP provides a framework for the Humboldt Operational Area agencies to respond
to any emergency requiring multiagency participation and/or activation of the County
Emergency Operations Center (EOC). All hazard-specific and topic-specific contingency
103 Humboldt County Operational Area Hazard Mitigation Plan 2019 pages C17-C19.
Ch. 5 – Services & Infrastructure [47]
plans complement and build on the EOP. Additionally, the City has an Emergency Action
Plan for chlorine and sulfur dioxide releases for the WWTP and a Water Quality Emergency
Notification Plan.104
5.6 Other Service Providers
Library Services: The City of Fortuna library provides information, reading, audio, and
visual materials105. The present library has reached capacity at 18,000 books and has a
monthly circulation around 9,000 books. The city has signed a memorandum of
understanding between the City of Fortuna and the Humboldt County Library. The MOU
transfers all library equipment owned by the City of Fortuna to the county. The Humboldt
County Library is responsible for maintenance, supplies, and property insurance of the
equipment, whereas the city owns the building and pays for repairs and maintenance.
Solid Waste Services: Solid waste collection in Fortuna is managed by franchise contract
with Recology Eel River which provides weekly curbside recycling and garbage pickup.
The city also promotes composting and sells compost bins at a subsidized rate to Fortuna
residents. The city’s Solid Waste Department is responsible for developing and
implementing the many programs contained in the Fortuna Source Reduction and
Recycling Element (FSRRE). The programs include public education, technology transfer,
recycling, and waste reduction activities. The department is also responsible for
supervision of solid waste franchise agreements.
Transit Services: The City of Fortuna provides public transit to all Fortuna residents through
sponsorship of the Humboldt Transit Authority. The City’s Parks and Recreation
Department operates the “Dial-a-Ride” service for seniors over the age of fifty and
persons with disabilities regardless of age. Two buses are in operation Monday through
Friday from 8:30 a.m. to 4:30 p.m106. One bus operates on Saturday from 9:00 a.m. to 3:30
p.m. Fare Box fees were increased by 25% in order to maintain the minimum requirement
that 10% of the Senior Bus operating expenses are recovered from Fare Box revenues107.
104 City of Fortuna, Public Works Department, Personal Communication. October 5, 2020.
105 City of Fortuna MSR. Humboldt LAFCo. 2008
106 City of Fortuna MSR. Humboldt LAFCo. 2008
107 City of Fortuna MSR. Humboldt LAFCo. 2008
Ch. 5 – Services & Infrastructure [48]
6.0 FINANCE
The City of Fortuna develops an annual budget for public hearing and approval by the
City Council before the beginning of each fiscal year (July 1 to June 30). The budget
process involves reviewing and prioritizing budget requests from each city department.
When developing the annual budget, City staff takes into consideration several guiding
principles:
• Current services be preserved at existing levels to the highest degree possible.
• Freeze vacant and part-time positions and retain full-time work force to the extent
possible.
• Comply with State Constitution, City Charter, and Municipal Code Provisions.
• Maintain and review working capital balances to ensure future reserve balances
are healthy enough to protect the City from any future uncertainties.
• Develop department budgets that reflect the best estimates possible for the true
cost of operations.
• Strive to balance recurring expenditures with recurring revenues.
The City adopted a conservative budget for FY 2020-21 and retained reserves in excess
of the City’s reserve policy. The budget will be revisited more frequently to review actual
revenue projections in relation to expenditures.
6.1 Revenues and Appropriations
Preparing the fiscal year 2020-21 budget required different processes due to the impacts
of COVID-19 pandemic. City Council used conservative projections for anticipated
revenue and identified ways to reduce expenditures to account for COVID-19 pandemic
impacts. This process involved going through each budget line item and taking out
anything that was not critical to supporting City services for the community. General fund
departments were directed to keep operation costs the same or lower than last year’s
budget.
During the budget process, the City became aware of how important Measure E
revenues were for the budget’s health. Since Measure E is a transaction and use tax, it is
applied to online sales and purchases not made within the City of Fortuna. Physical
businesses were not in operation during the shelter-in-place order, but online businesses
were still accessible. Therefore, online sales experienced less of a projected drop than
the City’s regular sales tax. Measure E funds were critical in covering the revenue shortfall
for this year’s budget.
Three special budget workshops were held with City Council and staff to discuss the
effects of the pandemic on the City’s budget. The first budget workshop held on May 11
Ch. 6 – Finance [49]
discussed General Fund expenditures and identified an approximate 10%108 decrease
from previous year’s budget in General Fund taxes and licenses revenues. Due to the
COVID-19 pandemic the largest sources of revenue, sales tax and transient occupancy
tax will be affected109. Sales taxes are estimated to be lower since non-essential
businesses have been closed. Transient occupancy taxes are estimated to be lower since
people are restricted to travel. At the second workshop on May 19, the City’s enterprise
funds were reviewed, which include the Water, Wastewater, and Transit Fund. An
enterprise fund is a self-sufficient fund, meaning it is supported by selling goods and
services to the public for a fee. Because these funds depend on service charges, they
did not need as significant reductions as the General Fund. At the third workshop on June
3, three sales tax revenue projection scenarios were discussed. The current budget
already included a reduction of $420,400 or 14.2% when compared to last year’s fiscal
budget110. The City decided to go with an option that decreased general fund sales tax
revenue and Measure E transaction and use tax revenue by an additional $125,000111.
This decrease in revenue required City staff to reduce expenditures for a more balanced
budget. The General Fund experienced reductions overall, including capital
improvement projects, capital outlay items, supplies, and professional services. It was also
necessary to freeze, furlough, and eliminate positions. Four positions have been frozen for
a year, one position has been frozen for 5 months, one position has been furloughed for
three months, and two positions have been eliminated. Changes to the budget include
decreased Police Department Remodel Project funds, freezing a vacant Streets
Maintenance Worker position, and eliminating the Police Office Supervisor position
(Figure 8 and 9).
Figure 9: General Fund Reductions 2020
108 City of Fortuna FY 2020-21 Staff Report. June 15, 2020.
109 City of Fortuna Annual Operating Budget Fiscal Year 2020-2021.
110 City of Fortuna FY 2020-21 Staff Report. June 15, 2020.
111 City of Fortuna FY 2020-21 Staff Report. June 15, 2020.
Ch. 6 – Finance [50]
Figure 10: 2020 Frozen or Eliminated Staff Positions
The combination of the General Fund and Measure E Fund provides the City with
$6,827,697 in total operating uses; this is a decrease of approximately $400,000 compared
to last year’s budget112. Measure E will continue to fund two Police Officer Detectives,
one Community Services Officer, one part-time Code Compliance Officer, and one Parks
and Recreation Director. Revenue generated from Measure E will also fund the nuisance
abatement program, storm drain maintenance projects, street maintenance projects,
transit assistance for seniors, recreation program staffing, parkland acquisition, and park
improvements.
The General Fund balance at the beginning of the 2020-2021 fiscal year is projected to
be $5.17 million with remaining reserves at $4.98 million at the end of the fiscal year.
Appropriations are greater than revenues by $740,617. Measure E funds in the amount of
$549,328 will be put towards the General Fund deficit. The combination of the General
Fund and Measure E Fund provides the City with $6,636,408, resulting in a loss of
$191,289113. The City will pull $191,289 from their reserves to account for this loss.
Table 11: City of Fortuna Net Position (in thousands of dollars)
Category FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Total Revenues 19,362 14,615 18,258 21,353 19,334
Total Expenses 12,381 12,108 14,275 17,694 16,636
Change in Net Position 6,981 2,507 3,983 3,659 2,698
Total Net Position $68,461 $70,968 $74,751 $78,410 $81,108
112 City of Fortuna FY 2020-21 Staff Report. June 15, 2020.
113 City of Fortuna FY 2020-21 Staff Report. June 15, 2020.
Ch. 6 – Finance [51]
Table 12: City of Fortuna Financial Summary114
Actual Actual Budget Estimated Adopted Change vs.
Category 17/18 18/19 19/20 19/20 20/21 PY Budget
Beginning Balance 4,138,382 4,994,303 5,146,810 5,146,810 5,172,453 25,643
Revenues
Taxes and Fees 5,609,469 5,723,985 5,440,080 5,374,430 5,035,872 (404,208)
Non-recurring Receipts 133,281 52,154 6,318 883,318 195,536 189,218
Transfers from other 125,720 184,642 394,728 394,728 549,328 154,600
Funds
Total Revenue $5,868,470 $5,960,781 $5,841,126 $6,652,476 $5,780,736 $ (60,390)
Appropriations
Salaries and Benefits 3,531,174 3,871,881 4,012,075 3,978,880 4,115,572 103,497
Services and Supplies 1,249,193 1,483,636 1,440,808 1,485,852 1,477,077 36,269
Capital Outlay 67,531 167,565 101,000 134,900 15,000 (86,000)
Projects 30,155 6,103 - 772,500 30,000 30,000
Debt Service - - - - - -
Development Fund - 136,630 136,373 133,940 171,505 35,132
River Lodge Fund 118,780 139,737 125,227 121,912 134,799 9,572
Transfers Funds 15,716 2,722 - - 28,072 28,072
Total Appropriations $5,012,549 $5,808,274 $5,815,483 $6,627,984 $5,972,025 $156,542
Gain (Loss) $855,921 $152,507 $25,643 $24,492 ($191,289) ($216,932)
Ending Balance $4,994,303 $5,146,810 $5,172,453 $5,171,302 $4,981,164 ($191,289)
As shown in Table 6-2, the City’s net position has steadily increased over the past five
financial years. This means the City has received positive income and is able to pay down
their debts for improved financial health.
6.2 Long-term Liabilities
At times, the City must enter into long term financing agreements for large capital
projects, land purchases, or other needs. As such, the City has several outstanding long-
term liabilities which can be separated into two different overarching categories:
governmental activities and business-type activities. Table 13 provides a summary of the
City’s obligations as of June 30, 2019.
114 City of Fortuna Annual Operating Budget Fiscal Year 2020-2021.
Ch. 6 – Finance [52]
Table 12: City of Fortuna Financial Liability Summary
Category Total Liability
Governmental Activities
Capital Lease Obligations $36,967
PGE Loan $56,766
Compensated Absences $213,759
Net Pension Liability $9,690,000
Business-type Activities
2017 Water Bonds $5,180,000
2017 Wastewater Bonds $8,370,000
Bond Premiums $1,831,024
Total Liabilities $25,378,516
As with most public agencies, the pension obligations make up the majority of the City’s
long-term liability followed by Wastewater and Water Bonds. Recent changes in CalPERS
obligations have increased pension debt for many agencies.
6.3 Reserves
The City maintains a reserve policy that promotes economic contingency by setting
aside funds for unexpected loss of revenue or economic downturn (5% of revenues) and
provides time to adjust services to changing revenues, Capital Improvement/
Infrastructure Reserve funds for unexpected major infrastructure failure, and
Operating/Working Capital Reserve cash flow for tax and grant collection period. The
City Council is able to reduce funds below this amount for unforeseeable financial
conditions and emergency situations. As of June 30, 2019, the General Fund had an
unassigned balance of $8,313,297115. The City Council is committed to maintaining the
General Fund Reserve Policy for FY 2020-21, which focuses on conservative fiscal
management. By maintaining General Fund reserves, the City is ensuring that critical City
services are maintained during difficult economic periods, such as the COVID-19
pandemic.
6.4 Financial Summary
The City continues to operate under its current financial policies which promote
balanced budgets and growth of financial reserves when possible. Considering
significant budget challenges posed by the COVID-19 pandemic, the City developed a
budget that allows services to continue at existing levels. Measure E revenue proved to
be critically important during the economic downturn caused by the COVID-19
pandemic. The City’s ability to prioritize services and allocate available resources creates
improved financial health and responsibility.
115 City of Fortuna 2018-2019 Comprehensive Annual Financial Report.
Ch. 6 – Finance [53]
7.0 MSR DETERMINATIONS
As set forth in Section 56430(a) of the CKH Act- In order to prepare and to update the
SOI in accordance with Section 56425, the commission shall conduct a service review of
the municipal services provided in the county or other appropriate area designated by
the commission. The commission shall include in the area designated for a service review
the county, the region, the sub-region, or any other geographic area as is appropriate
for an analysis of the service or services to be reviewed, and shall prepare a written
statement of its determinations with respect to each of the following:
(1) Growth and population projections for the affected area
a) Currently, the estimated population of the City of Fortuna is 12,259 and the
estimated population of 2030 is 16,817.
(2) The location and characteristics of any disadvantaged unincorporated communities
within or contiguous to the sphere of influence
a) Given Fortuna’s MHI which is 64% of the State MHI, it stands to reason that sections
of unincorporated territory surrounding the City may qualify as disadvantaged.
Should Fortuna pursue annexation, DUCs within the proximity of the city may be
further evaluated.
b) The community of Becker/Blair Lane is adequately served for fire and water
services, however, it is underserved with wastewater service.
c) The community of Carlotta receives fire protection services from the Carlotta CSD,
whereas community water and wastewater services is not available to the
Carlotta community. Carlotta has a MHI of $61,458 which is 86 percent of the
California MHI116 and does not qualify it as a DUC.
d) The community of Hydesville receives water services from the Hydesville County
Water District, which has two groundwater wells located at Ward Creek, and fire
protection services from the Fortuna Fire Protection District. Community
wastewater services is not available to the Hydesville community. Hydesville
Census Designated Place has a MHI of $55,577 which is 78 percent of the California
MHI and qualifies it as a DUC.
e) The community of Palmer Creek has a MHI of $48,292 which is 68 percent of the
California MHI and qualifies it as a DUC. The community is currently served by the
Palmer Creek CSD which provides water and wastewater services.
116 American Community Survey 5-year Estimates (2018), Table B19103 – Median Income in the Past 12 Months, Block
Group 2, Census Tract 109.02, Humboldt County, California. Accessed October 22, 2020.
Ch. 7 – MSR Determinations [54]
(3) Present and planned capacity of public facilities and adequacy of public services,
including infrastructure needs or deficiencies
a) The City’s wastewater treatment and disposal system is required to be upgraded
to comply with environmental regulations set by Regional Water Quality Control
Board. It is encouraged that the City continue with the planned facility
improvements as outlined in the Capital Improvement Program and the City of
Fortuna Wastewater Treatment and Effluent Percolation System Upgrade Project
report.
(4) Financing ability of agencies to provide services
a) The City continues to operate under its current financial policies which promote
balanced budgets and growth of financial reserves when possible. Considering
significant budget challenges posed by the COVID-19 pandemic, the City
developed a budget that allows services to continue at existing levels. The City’s
ability to prioritize services and allocate available resources creates improved
financial health and responsibility.
(5) Status of and, opportunities for, shared facilities
a) Currently, the City receives wastewater from Palmer Creek CSD for treatment and
disposal. The agreement provides for adequate services to the District but does
not allow any additional connections without City approval.
(6) Accountability for community service needs, including governmental structure and
operational efficiencies
a) The City of Fortuna maintains a website where it posts City information,
documents, and updates.
b) The City is governed by a five-member City Council elected to serve 4-year terms.
Regularly scheduled monthly City Council meetings are held and all meetings are
open to the public and are publicly posted a minimum of 72 hours prior to the
meeting in accordance with the Brown Act.
(7) Any other matter related to effective or efficient service delivery
a) There are no other matters related to delivery of services.
Ch. 7 – MSR Determinations [55]
8.0 SOI DETERMINATIONS
In order to carry out its purposes and responsibilities for planning and shaping the logical
and orderly development of local governmental agencies to advantageously provide
for the present and future needs of the county and its communities, the commission shall
develop and determine the sphere of influence of each city, as defined by G.C. Section
56036, and enact policies designed to promote the logical and orderly development of
areas within the sphere. In determining the sphere of influence of each local agency, the
commission shall consider and prepare a written statement of its determinations with
respect to the following:
(1) Present and planned land uses in the area, including agricultural and open-space
lands.
a) Humboldt County General Plan land uses within the City’s SOI are predominantly
Residential Estates and Agricultural Exclusive with Airport land use compatibility
overlay in some portions. Other land uses include Residential Low Density,
Agricultural Grazing, Urban Reserve, Timberland, Public Facility, Commercial
Recreation, and Residential Agriculture.
(2) Present and probable need for public facilities and services in the area.
a) The City of Fortuna has approximately 55 water service connections outside the
City boundary, which indicates a continued need for services in the area.
b) Only minor changes are being proposed to the City’s SOI to better follow parcel
lines and to capture land uses that would require services or that would be
considered for annexation in the future. Additionally, the SOI takes into account
the Urban Development Areas and Urban Expansion Areas.
(3) Present capacity of public facilities and adequacy of public services that the
agency provides or is authorized to provide.
a) The City is upgrading its wastewater treatment facility to comply with
environmental regulations set by Regional Water Quality Control Board. The City
is encouraged to complete planned upgrades for the wastewater treatment
and effluent percolation system prior to the consideration of future annexations
to ensure the service of current needs and plan for anticipated future growth.
b) The City is currently using approximately 1,300-acre feet or 79% of its 1,642-acre
feet groundwater allocation under current water rights, which allows some room
for future growth.
(4) Existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
a) The Hydesville area located southeast of the City is a potential community of
interest. However, the area is currently served by the Hydesville County Water
District.
Ch. 8 – SOI Determinations [56]
(5) For an update of a sphere of influence of a city or special district that provides
public facilities or services related to sewers, municipal and industrial water, or
structural fire protection, the present and probable need for those public facilities
and services of any disadvantaged unincorporated communities within the existing
sphere.
a) Unincorporated territory surrounding the City may qualify as disadvantaged.
Should future annexations or service extensions be proposed, special
consideration will be given to any DUCs affected by the annexation consistent
with GC §56375(8)(A) and LAFCo Policy.
b) The community of Hydesville receives water services from the Hydesville County
Water District, which has two groundwater wells located at Ward Creek, and fire
protection services from the Fortuna Fire Protection District. Community
wastewater services is not available to the Hydesville community. Hydesville
Census Designated Place has a MHI of $55,577 which is 78 percent of the California
MHI and qualifies it as a DUC.
c) The community of Palmer Creek is identified as a DUC and is currently within the
boundary of Fortuna’s SOI and Palmer Creek CSD which provides water and
wastewater services. Wastewater is transported from the Palmer Creek CSD
system to the City’s wastewater treatment plant.
d) The community of Becker/Blair Lane is adequately served for fire and water
services, however, it is underserved with wastewater service.
Ch. 8 – SOI Determinations [57]
Appendix A: References Cited
• Census Quick facts Population Estimates, July 1, 2019
• City of Fortuna MSR. Humboldt LAFCo. 2008
http://humboldtlafco.org/wp-content/uploads/Fortuna-ADOPTED-MSR-2008.pdf
• City of Fortuna General Plan 2030
https://www.friendlyfortuna.com/Document%20center/Department/Planning%20Div
ision/General%20Plan%20and%20EIR%20Documents/Fortuna%20General%20Plan%20
2030%20-%20%20Policy%20Document_web.pdf
• California Department of Finance Population Projections
http://www.dof.ca.gov/forecasting/demographics/projections/
• City of Fortuna Housing Element. Placeworks. August 2019.
https://www.friendlyfortuna.com/Document%20center/Department/Planning%20Div
ision/2019%20-
%202027%20Housing%20Element%20PUBLIC%20DRAFT_for%20ADOPTION_August%202
019_201908011713516341.pdf
• American Community Survey 5-year Estimates (2018), Table S1903 – Median Income
in the Past 12 Months, Fortuna City, CA. Accessed January 22, 2020.
• Humboldt County General Plan 2017- Housing Element Appendix G
https://humboldtgov.org/DocumentCenter/View/5081/Appendix-G-Housing-
Element-Appendix-PDF?bidId=
• US Census, American Community Survey 2018 5-year Estimates, Humboldt County
Block Group 108.2, Table B19013. Accessed April 7, 2020.
• City of Fortuna CIP FY 15-16
https://www.friendlyfortuna.com/Document%20center/Department/Public%20Work
/CIP/15-16%20CIP%20Final.pdf
• City of Fortuna CIP FY 16-17
https://www.friendlyfortuna.com/Document%20center/Department/Public%20Work
/CIP/16-17%20CIP%20Final.pdf
• City of Fortuna CIP FY 17-18
https://www.friendlyfortuna.com/Document%20center/Department/Public%20Work
/CIP/17-18%20CIP%20Final_reduced.pdf
• City of Fortuna CIP FY 18-19
https://www.friendlyfortuna.com/Document%20center/Department/Public%20Work
/CIP/18-19%20CIP%20Final.pdf
• City of Fortuna CIP FY 19-20
https://www.friendlyfortuna.com/Document%20center/Department/Public%20Work
/CIP/19-20%20CIP%20Final_reduced.pdf
Appendix A [58]
• City of Fortuna CIP FY 20-21
https://www.friendlyfortuna.com/Document%20center/Department/Public%20Work
/CIP/20-21%20CIP_Final.pdf
• https://www.friendlyfortuna.com/departments/finance/water_sewer_services/water
_billing_info.php
• Wastewater Treatment and Effluent Percolation System Upgrade Project. GHD. April
2020
https://ceqanet.opr.ca.gov/2020050104/2/Attachment/aklUje
• Fortuna Municipal Code Section 17.06.120.5
https://www.codepublishing.com/CA/Fortuna/#!/Fortuna17/Fortuna1706.html#17.0
6.120.5
• Humboldt County Code Section 55.4.5.1.4
https://humboldt.county.codes/Code/314-55
• Eel River-Lost Coast Regional Fire Services MSR. Humboldt LAFCo. 2016
http://humboldtlafco.org/wp-content/uploads/Regional-FPD-MSR_Eel-River-Valley-
Lost-Coast_ADOPTED-01.18.17.pdf
• Fortuna City Council Meeting Agenda. May 19, 2020. Accessed July 20, 2020.
https://www.friendlyfortuna.com/Document%20center/Agendas%20and%20Minutes
/City%20Council/2020/Agendas/05-19-2020%20Special%20Budget%20Workshop.pdf
• City of Fortuna 2019 Consumer Confidence Report
• City of Fortuna Wastewater Treatment Plant 2019 Annual Report. February 6, 2020.
• City of Fortuna Sewer System Management Plan. July 1, 2018.
• City of Fortuna. Department Staff Directory. Accessed August 7, 2020.
https://www.friendlyfortuna.com/departments/public_safety/department_organizat
ion.php
• City of Fortuna Annual Operating Budget Fiscal Year 2020-2021.
• City of Fortuna FY 2020-21 Staff Report. June 15, 2020.
• City of Fortuna Fee Schedule Fiscal Year 2019-2020.
• City of Fortuna 2015 Urban Water Management Plan. Freshwater Environmental
Services. May 25, 2016.
https://www.friendlyfortuna.com/Document%20center/Department/Public%20Work
/Water%20&%20Wastewater%20Departments/2015%20FORTUNA%20URBAN%20WATE
R%20MANAGEMENT%20PLAN%20083016.pdf
• City of Fortuna 2018-2019 Comprehensive Annual Financial Report.
• City of Fortuna Highway 101, Fortuna Downtown and Riverwalk Area Complete Streets
and Connectivity Planning Study. GHD. November 4, 2016.
Appendix A [59]
• California Bond Accountability website. Accessed September 28, 2020.
https://bondaccountability.resources.ca.gov/Project.aspx?ProjectPK=8475&Propositi
onPK=5
• Palmer Creek CSD and City of Fortuna Wastewater Treatment Agreement 1989.
• Countywide Recreation and Park Services. Humboldt LAFCo. 2016.
• City of Fortuna, Public Works Department, Personal Communication. October 5, 2020.
• City of Fortuna, Finance Department, Personal Communication. October 5, 2020.
• Humboldt County Staff Report, Expenditure Authorization for Humboldt County Flood
Control District. September 6, 2016.
• City of Fortuna Letter of Support for Eel River Valley Groundwater Sustainability Plan
and Monitoring Well Installation Project. November 5, 2019.
• County of Humboldt website: https://humboldtgov.org/2489/Groundwater
• County of Humboldt website: https://humboldtgov.org/2485/Levee-Management
• County of Humboldt, Public Works Department, Personal Communication. October 2,
2020.
• Memo from Michael Baker International to Liz Shore, Deputy Director of Community
Development. May 23, 2018.
• Memo from Michael Baker International to Liz Shore, Deputy Director of Community
Development. July 10, 2018
Appendix A [60]