SERRVICCE AREAA PLAN
UUPDAATEE
(cid:1)
AAdopted: Septtemberr 2015
Prepared By:
CITY OOF IMPERRIAL
SSERVICEE AREA PLAN
Prrepared By:
CITY OOF IMPERIIAL
420 Imperial Avennue
Imperial,California 92251
Suubmitted to:
IMPERRIAL COUNNTY
LOCAL AAGENCY FOORMATIONN COMMISSSION
801 Main Street
El Centro, CA 922243
1601 N. Immperial Aveenue
El Centro, CA. 922243
Adopted: Septembeer 2015
TABLE OF CONTENTS
Page
INTRODUCTION & BACKGROUND 1
I. Introduction 1
II. Background 3
III. Organization and Structure of Service Area Plan 11
EXECUTIVE SUMMARY 13
I. Population Projections 13
II. Findings 13
LAND USES IN ANNEXATION AREAS & GROWTH PROJECTIONS 23
I. Land Uses and Annexation Areas 23
II. Growth Projections 37
PUBLIC FACILITIES AND SERVICES 46
I. Administration 47
II. Drainage and Stormwater 52
III. Fire Protection 59
IV. Police Protection 65
V. Library 71
VI. Recreational and Park Facilities 75
VII.. Circulation and Transportation 80
VIII. .S anitary Sewer 95
IX. Domestic Water 105
X. Financing Plan 113
I. Introduction 113
II. Financing Opportunities and Constraints 113
III. Facility Financing 120
Exhibits
Exhibits Page
Exhibit 1 Geographic Location Map 4
Exhibit 2 City Limits & Sphere of Influence Boundaries 6
Exhibit 2A 2015 Sphere of Influence Boundary & City Limits 7
Exhibit 2B 2035 Planned Sphere of Influence 8
Exhibit 3 General Plan Land Use Map 24
Exhibit 4 Planning Period Annexation Areas 27
Exhibit 5 Administration Facilities 48
Exhibit 6 Drainage Zones and Retention Facilities 53
Exhibit 7 Existing & Proposed Fire Station Facilities 61
Exhibit 8 Existing & Proposed Police Protection Facilities 67
Exhibit 9 Existing Park Facilities 76
Exhibit 10 City of Imperial Circulation and Transportation System 83
Exhibit 11 Wastewater Facilities 97
Exhibit 12 Existing Water Facilities 107
Tables
Tables Page
Table E-1 City of Imperial Population Projections 13
Table G-2 Developable Land by Land Use 25
Table G-3 Land Use Designation Build Out Density 25
Table G-4 City Limit Developable Units 26
Table G-5 City of Imperial Annexation Areas 28
Table G-6 Annexation Areas as Phased Residential Units 36
Table G-7 Existing Dwelling Units 38
Table G-8 Future Dwelling Units 39
Table G-9 Build-Out Dwelling Units 40
Table G-10 Build-Out Population Projection 40
Table G-11 Build-Out Non-Residential In SOI 43
Table G-12 City and Annexation Non-Residential Development 44
Table G-13 Population Projections for City of Imperial/SOI 45
Table G-14 EDU’s for City of Imperial/SOI 45
Table A-1 Administration Facilities 47
Table A-2 Administrative Facilities Demand 50
Table A-3 Projected Administrative Costs 51
Table D-1 Projected Drainage Facilities Costs 58
Table F-1 Projected Fire Service Demand 62
Table F-2 Projected Fire Service Costs 64
Table P-1 Projected Police Service Demand 68
Table P-2 Projected Police Service Costs 70
Table L-1 Projected Library Service Demand 73
Table L-2 Projected Library Service Costs 74
Table R-1 City of Imperial Park Space 75
Table R-2 Projected Parkland Demand 78
Table R-3 Projected Recreation Cost 79
Table C-1 Major Street Classifications 81
Table C-2 Future Roadway Improvements in City Limits 86
Table C-3 Future Roadway Improvements in Annexation Areas 87
Table C-4 Phasing of Roadway Improvements in Annexation Areas 88
Table C-5 Projected Street Maintenance Costs 90
Table C-6 Future Roadway Costs Within City Limits 91
Table C-7 Future Roadway Costs by Annexation Areas 92
Table S-1 Pipeline Design Criteria 96
Table S-2 Pump Station Inventory 98
Table S-3 Pump Station Adequacy 100
Table S-4 Daily Sewer Flow Projections 100
Table S-5 Daily Sewer Flow Projections with EDU’s 101
Table S-6 Projected Sewer Costs 104
Table W-1 Water Flow Standards 105
Table W-2 Water Plant Facility Capacity by Component 106
Table W-3 Daily Water Flow Projections 109
Table W-4 Daily Water Flow Projections with EDU’s 109
Table W-5 Projected Water Costs 112
Figures
Figures Page
Figure 1-A Population Growth 9
Figure G-1 Population Projection for the City of Imperial 41
Appendices
Appendices
Appendix A City of Imperial Adopted Municipal Budget FY 2014-2015
Appendix B Agreement for Fire Protection Services
Appendix C Engineers Opinion of Probable Quantity & Cost Calculation
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
INTRODUCTION & BACKGROUND
I. INTRODUCTION
A. History of Municipal Service Reviews
In 1997, Assembly Bill (AB) 1484 established the Commission of Local
Governance for the 21st Century. The role of the Commission of Local
Governance was to evaluate local government organization and operational
issues and develop a statewide vision and determine how the State should grow.
The Commission in their final report identified four critical findings, as follows:
The future will be shaped by continued phenomenal growth;
California did not have a plan for growth;
Local Government budgets are perennially under siege;
The public is not engaged.
Within this framework, the Local Governance Commission concluded that Local
Agency Formation Commission’s (LAFCO’s) powers should be expanded and be
a participant in regional growth and planning forums. Further, the Local
Governance Commission recommended that State law be amended to require
that spheres of influence be regularly updated and that LAFCO’s initiate periodic
regional municipal service reviews, also known as service area plans, to ensure
the efficient provision of governmental services. A sphere of influence is defined
by law as a “…plan for the probable physical boundaries and service area of a
local agency, as determined by the Commission” (GC 56076).
As a result of the Local Governance Commission’s recommendations, on
September 26, 2000, Governor Gray Davis signed into law AB 2838, titled the
Cortese-Knox-Hertzberg Local Government Reorganization Act. The Cortese-
Knox-Hertzberg Act requires each LAFCO to review and update as necessary
the spheres of influence for all applicable agencies within each County. In
Imperial County, service area plans are recommended to be updated every five
years in order to be in compliance (Governor’s Office of Planning and Research,
LAFCO Municipal Service Review Guidelines).
B. Purpose of the Service Area Plan
Service area plans are intended to assess current service demand and future
service needs within an agency’s sphere of influence, and demonstrate that
future public facilities, for the provision of services, have been identified in
accordance with the Cortese-Knox-Hertzberg Act. Service area plans provide
each LAFCO with a tool to comprehensively study existing and future public
service
1 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
conditions and to evaluate organizational options for accommodating growth,
preventing urban sprawl, preserving open space and prime agricultural lands,
and efficiently extending government services. The City of Imperial Service Area
Plan will provide the Imperial County Local Agency Formation Commission with a
detailed description and analysis of how facilities will be provided in the proposed
sphere of influence.
C. Requirements of a Service Area Plan
The requirements of the contents of an up to date service area plan are
determined by the State’s Government Code. Per Government Code Section
56430, LAFCO shall prepare a written statement of its determinations with
respect to each of the following plan requirements:
1. Growth and population projections for the affected area.
2. Present and planned capacity of public facilities and adequacy of
public services, including infrastructure needs or deficiencies.
3. Financial ability of agencies to provide services.
4. Status of, and opportunities for, shared facilities.
5. Accountability for community service needs, including governmental
structure and operational efficiencies.
6. Any other matter related to effective or efficient service delivery, as
required by commission policy.
D. Role of the Imperial County Local Agency Formation Commission
The Imperial County Local Agency Formation Commission (IC LAFCO) is
charged with the review and approval of the City of Imperial Service Area Plan.
The Imperial County LAFCO is comprised of two County Supervisors appointed
by the Board of Supervisors, two City Council members appointed by the City
Selection Committee, and one public member approved by LAFCO, for a total of
five members. LAFCO has the authority to review, approve, or deny boundary
changes, city annexations, consolidations, special district formations,
incorporations for cities and special districts, and to establish local spheres of
influence.
The Imperial County LAFCO responded to the new mandates of AB 2838 by
adopting State Municipal Service Review Guidelines from the Governor’s Office
of Planning and Research (OPR) as the Imperial County LAFCO’s new Service
Area Plan Guidelines. Imperial County LAFCO requires a service area plan be
approved prior to approval of a sphere of influence amendment and/or
annexation. Imperial County LAFCO must be able to ascertain that there will be
sufficient public facilities within the requested sphere of influence or annexation
consistent with the following:
2 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
a) In conducting a service review, the Commission shall comprehensively
review all of the agencies that provide the identified service or services within
the designated geographic area.
b) The Commission shall conduct a service review before, or in conjunction with,
but no later than, the time it is considering an action to establish a sphere of
influence in accordance with Section 56425 or Section 56426.5 or to update a
sphere of influence pursuant to Section 56425.
E. Current Status of the City of Imperial Service Area Plan
The last City of Imperial Service Area Plan (SAP) was prepared in 2007 by
Howes, Weiler & Associates and was adopted by LAFCO on June 26, 2008.
Since its adoption, there have been some modest changes in growth projections
and facility improvements. The 2007 data had made some aggressive growth
projections, and thus service demand was projected to be higher. This demand
has since been modestly adjusted as presented herein. There are some modest
changes to growth patterns within the proposed service areas. This new updated
Service Area Plan provides a more current analysis of existing public facilities
and services of the City of Imperial and indicates how the demand created by
future developments within the City’s service area would be met for each
service and facility.
II. BACKGROUND
A. Geographic Location
The City of Imperial is a predominantly agricultural community situated 13 miles
north of the U.S./Mexico border and is located in Imperial County. The City
encompasses approximately 5.85 square miles and is adjacent to the northern
boundary of the City of El Centro. State Route 86 serves the entire Imperial
County, traverses the City of Imperial at a north/south orientation, and functions
as the Town’s main arterial. The City is home to many important operations
including the Imperial County Airport, the Imperial Irrigation District
Headquarters, and the El Centro Sector Headquarters of the U.S. Border Patrol,
all of which contribute to employment opportunities and demand for housing thus
impacting growth and service demand. Exhibit 1-City of Imperial Geographic
Location, illustrates the regional location of the City of Imperial in relation to the
rest of Imperial County.
3 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
Exhibit 1- City of Imperial Geographic Location
4 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
A. City Limits and Existing Sphere of Influence
The legal City limits is uniquely shaped and may be generally described as
bound by Treshill Road to the south (excluding a small area just south of the
Aten Road & Clark Road intersection), extending west to Austin Road and
northerly up to Ralph Road closer along Highway 86 in an irregular pattern, and
easterly in the same diversified manner. The adopted Sphere of Influence
follows a similar pattern, prioritizing growth areas to the east (refer to Exhibit 2 –
City Limits and Sphere of Influence Boundaries).
The entire 2014 Sphere of Influence consisted of approximately 7,507 acres of
land, 3,855 of which are within the City limits. There are some minor boundary
changes proposed under this 2015 Service Area Plan Update as can be depicted
in the same Exhibit 2-City Limits and Sphere of Influence Boundaries. The
changes are described first as the inclusion of a sparsely developed area west of
the City limits between Austin Road and the City’s western legal boundary line.
This area encompasses approximately 811 acres of low density residential, and
is further discussed in the City’s Planned Annexation areas at a 20 year horizon.
The second change involves the inclusion of two vacant sites totaling 210 acres
one of which is northeast of the City and a second along Dogwood Road both of
which will allow for continuity in future annexations, within a twenty (20) year
horizon. The final change involves the elimination of a 145 acre area located at
the southeast intersection of Aten Road and Dogwood Road, (previously known
as Castle Arch). The resulting final Sphere of Influence boundary map is noted
as Exhibit 2A 2015 Sphere of Influence & City Limits. The final 2015 Sphere
of Influence boundaries would encompass a total of 8,383 acres. The City of
Imperial’s ultimate goal and service area boundary is proposed to extend easterly
to Highway 111 as depicted in Exhibit 2B Planned 2020 Sphere of Influence.
This Service Area Plan will take into consideration facility demands into the
expanded areas up to Highway 111 as planned expansion.
B. Population and Demographics
The City of Imperial has the highest growth rate in the County (54.3 % since
2006 per the California Department of Finance). Based on population data
available from the US Census Bureau and the State Department of Finance, the
City of Imperial has experienced an aggressive population growth over the last
couple of decades when taking into account growth trends since 1990. The City
of Imperial was incorporated in July 12, 1904, had a population of 4,413 by 1990
and by 2014, had an estimated population of 16,708. From 1990 to 2010, the
City had the highest growth in Imperial County, growing at an average annual
growth rate of 12.94 percent compared to Imperial County as a whole which
experienced an average growth rate of 2.99 percent for the same time period.
5 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
Exhibit 2 – City Limits and Sphere of Influence Boundaries
6 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
Exhibit 2A– 2015 Sphere of Influence Boundary & City Limits
7 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
Exhibit 2 B– 2020 Planned Sphere of Influence
8 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
Figure 1-A Depicts historic Population growth within the incorporated city limits
in five year increments and as of January 2015.
Figure 1A - Population Growth Within
City of Imperial from 1990-20151
17,313
18,000
14,758
16,000
14,000
12,000
9,470
10,000
7,714
8,000 6,489 Population
6,000 4,413
4,000
2,000
0
1990 1995 2000 2005 2010 2015
Source: U.S. Census Bureau for 2010 statistics (actual building permits 2010 through 2015)
1Imperial Building Permit records were used to estimate 2010-2015 population growth at 3.35 pphh
A consistent and robust housing market has been a major contributor to the
aggressive population growth in Imperial. Another significant factor contributing
to the population growth may be attributed to population demographics. Over 74
percent of the Imperial population is Latino, according to US Census figures.
Culturally, Latinos tend to share households with extended family members. The
City’s average household size of 3.35 persons per household is significantly
larger than the State’s average household size at 2.90 persons per household
(US Census, 2010). These statistics are important in determining what the
service needs of the population are.
There is a vibrant population outlook associated with new development planned
within the City’s Sphere of Influence. Imperial’s service area, and thus potential
growth areas, are comprised of relatively large tracts of vacant, low-priced
farmland that has captured the market interest of residential developers. Imperial
is also near the Imperial Valley Community College, which serves the entire
region, and which along with its centralized location in the County, make Imperial
an attractive location for residential, commercial, and industrial development.
These factors and planned annexations highlight the importance of planning
services and facilities to adequately serve the projected population. It is
projected that by 2035 the City’s population will be 26,923 (Source: Southern
California Association of Governments 2012-2035 Regional Transportation Plan)
and up to 62,541 when considering planned annexations. Population trends and
projections are further discussed under Growth and Phasing Projections.
9 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
B. City of Imperial Operations, Public Facilities and Services
The administrative offices of the City of Imperial are located at 420 South
Imperial Avenue, and serve a constituency of approximately 4,859 persons
(Imperial County Elections Office, January 2012). The governing structure
consists of a five-member City Council elected by the public. A City Manager
reports directly to the City Council and is charged with overseeing the City’s
operation and employees. The City also has a legal counsel that reports to the
Council and the City Manager.
The City currently operates with 87 employees and had a 2014/2015 fiscal year
General Fund budget of approximately $8,551,547 and Enterprise Funds for
Water ($4,439,500) and Wastewater ($3,415,567), for a total budget of
$14,620.252 (Source: City of Imperial Adopted Municipal Budget FY 2014-2015).
The City of Imperial provides a full range of public services including
administration, storm-water and drainage, fire protection, police protection, public
library services, parks and recreation, transportation/circulation facilities, sanitary
sewer and domestic water. Wastewater collection and treatment services and
potable water treatment and distribution services by far demand the highest
capital investment within the City’s service area.
Having a comprehensive and reliable Service Area Plan is of utmost important
for orderly growth and development. The City’s Mission Statement is “To
promote and provide for the safety, health and welfare of our citizens and
business community, it is the Mission of the City of Imperial through its elected
officials, appointed officials, employees and volunteers to:
Provide customer service in a professional, cost-effective and
innovative manner, consistent with the values of integrity,
teamwork, stewardship, competence, politeness and respect.
Provide land use planning direction that preserves City heritage
and quality of life while promoting community improvement and
economic development.
Commit appropriate revenues to fund innovative, high quality,
cost-efficient City programs and services while maintaining
adequate reserves for unforeseen event or opportunities.
Regularly evaluate City programs and services and revise them
when appropriate.
Seek the involvement of citizens in City government and
planning, and foster civic leadership.
10 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
III. ORGANIZATION AND STRUCTURE OF SERVICE AREA PLAN
This Service Area Plan discusses the services currently provided by the City of
Imperial, estimates the current and future demand for such facilities and services,
and describes how necessary facilities and services will be, or may be, developed or
improved on to meet population demands. The intent of the Service Area Plan is to
demonstrate the City’s ability to provide adequate services within the sphere of
influence boundaries in the event of new development with the City Limit or new
annexations into the Sphere of Influence. An approximate 20-year planning period is
used to forecast growth and the estimated facility and service demands are based on
population projections in five-year increments until 2035.
This document complies with the requirements of Section 56653(b) regarding the
preparation of a plan for providing services (Service Area Plan) and provides the
information necessary for LAFCO to conduct a municipal services review in
compliance with Section 56430. This Service Area Plan document is further
organized into the following six sections that satisfy the Guidelines adopted by the
Imperial County LAFCO:
INTRODUCTION AND BACKGROUND: Provides a brief description of the City of
Imperial as well as the general characteristics of the community and Service Area
Plan requirements, including overall content of the Service Area Plan.
EXECUTIVE SUMMARY: Provides a brief summary of the services assessment and
conditions identified in the plan and highlight critical information regarding existing
facilities, demand, mitigation, their costs, and anticipated methods of financing.
LAND USES IN ANNEXATION AREAS & GROWTH PROJECTIONS: Provides a
discussion on existing and planned land uses in the City’s Sphere of Influence and
describes potential impacts associated with population growth and projected service
demand.
BUILDOUT/PHASING PROJECTIONS: Provides a discussion on build-out phasing
projections within the 20-year planning period. The intent of this section is to provide
an additional planning tool that may allow the City to anticipate future public facility
needs and to budget monies for any identified improvements.
PUBLIC FACILITIES AND SERVICES: Provides a thorough description of current
and planned facilities and services, and its current and projected adequacy. The
following facilities and services are included in the review:
I. Administrative Facilities
II. Stormwater & Drainage Facilities
III. Fire Protection Facilities
IV. Police Protection Facilities
11 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN INTRODUCTION & BACKGROUND
V. Library Facilities
VI. Parks and Recreation Facilities
VII. Circulation & Transportation Facilities
VIII. Sanitary Sewer Facilities
IX. Domestic Water Facilities.
FINANCING PLAN: Identifies and discusses existing and potential sources of
revenue and financing mechanisms for public facilities and services available to the
City. In addition, this section would identify cost saving opportunities in shared
facilities.
12 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
EXECUTIVE SUMMARY
This Executive Summary provides a brief summary of the population projections to provide a
context for the analysis and findings presented for each individual public facility in terms of the
performance standard, existing facilities, existing facility demand versus anticipated future
demand and its adequacy, mitigation, funding sources, annual budget and cost per capita.
I. POPULATION PROJECTIONS
This Service Area Plan uses population projections based on the recent and anticipated
annexations, as provided in the Growth Projections section of this document. The City of
Imperial’s January 2015 population was 17,313 and estimated to increase to just under
49,000 by 2025 and is expected to grow to just over 62,500 by the year 2035 when
taking into account approved and planned development and not just a historic growth
rate. The following table, City of Imperial Population Projections, projects the future
population of the City of Imperial through Year 2035 in five year increments under both
scenarios.
Table E-1 City of Imperial Population Projections
Population Population
Year Projections Projections
At 2.23% For Planned
Growth Development2
Rate1
2020
19,766 29,476
2025
22,072 48,692
2030
24,648 53,533
2035
26,923 62,541
1Growth rate based on SCAG 2012-2035 Regional Transportation Plan
2Calculated by determining realistic number of dwelling units from
planned development in annexation areas and multiplying by 3.35
person per household.
II. FINDINGS
The service review findings are based on information obtained from existing reports
such as Preliminary Engineering Reports (PER’s), Master Plans, Infrastructure
Studies, Specific Plans, Adopted Budgets, Capital Improvement Plan and discussions
with City Staff. The following facilities and services were reviewed: Administrative
Facilities, Storm-water & Drainage, Fire Protection, Police Protection, Library Facilities,
Parks & Recreation Facilities, Circulation & Transportation Facilities, Sanitary Sewer
Facilities and Domestic Water Facilities. Findings for each facility/service are
summaries in the proceeding tables. Each table identifies the respective facilities
13 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
performance standard which is the desired level of service that the respective public
facility must provide and subsequently describes the corresponding facilities
assessment to meet current and future demands.
A. Administrative Facilities
Administrative facilities include buildings that house administrative staff and that
provide general administrative services to Imperial residents and the business
community. Examples of administrative services include utility billing and
collection, services to the City Council, planning and development services and
other similar administrative functions of the City.
Administrative Facilities
Performance Standard 842 SF of Building Space/1,000 Population
Existing Facilities City Clerk 306 SF
City Hall 2,523 SF
City Manager 866 SF
Legislative 1,000 SF
Community Center 2,568 SF
Parks & Recreation 288 SF
Senior Center 2,337 SF
9,888 SF
Existing Demand 2015: 14,577 SF
Future Demand 2020: 24,818 SF
2025: 40,998 SF
2035: 52,659 SF
Adequacy 2015 14,577 SF Deficient -4,689 SF
Mitigation By 2035 42,771 SF shall be added.
Funding Sources Current: Property tax, sales tax, license & permit fees,
fines & penalties, service charges, and Development
Impact Fees
Future: Continue existing sources and explore general
obligation bonds or City-wide Community Facilities District
Annual Budget $2,321,318 FY 14/15
Cost Per Capita (2015) $134.08
14 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
B. Storm-Water & Drainage Facilities
Storm-water and drainage facilities include facilities that carry off excess water
and more specifically for the purpose of conveying storm water during storm
events. These include curb and gutter along streets, catch basins within
improved developments, retention basins, and canal drains. Drainage facilities
on occasion may include pump stations. These facilities are largely City owned
facilities that convey storm water runoff into the main water drainage system
managed by the Imperial Irrigation District (IID).
Drainage & Stormwater Facilities
Performance Standard City of Imperial Design Guidelines, NPDES Requirements,
IID Discharge Requirements, and any FEMA
Requirements. Performance shall convey up to a 100-year
storm incident.
Existing Facilities Five primary drainage zones within the City consisting of
ditches, pipes, retention basins and surface flow.
Existing Demand TBD-As new development occurs
Future Demand To be determined based on the rate and type of new
development assessed at the time of plan review.
Adequacy There are some areas within the incorporated City Limits
that experience flooding conditions during storm events,
but all areas are able to discharge within 72 hours.
There are some areas planned for future annexation that
are sparsely developed as residential low density that
experience flooding during large storm events due to
native material shoulders and lack curb and gutter.
Mitigation Developer responsibility to improve in accordance with
performance standards and implement best management
practices prior to permit issuance.
Funding Sources Current: Property tax, sales tax, license and permit fees,
charges for services and other miscellaneous sources.
Future: Continue existing sources and implement
Community Facility Districts or Community Service
Districts
Annual Budget $34,505 FY 14/15
Cost Per Capita (2015) $1.99
15 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
C. Fire Protection Facilities
Fire Protection facilities include the fire station, and other support equipment
including firefighting equipment such as fire engines, water tenders, and other
firefighting units. Fire facilities also include the staffing level needed to man and
operate the aforementioned equipment and deliver emergency and fire-protection
services. The City of Imperial contracts with the County of Imperial for fire
protection and emergency services in accordance with the Agreement for Fire
Protection Services dated June 18, 2014.
Fire Protection Facilities
Performance Standard Five (5) Minute Response for Medical Emergencies
Seven (7) Minute Response for Structural Fires
Existing Facilities & One (1) 500 Gallon Engine (City Owned)
One (1) 500 Gallon/105 FT Ladder Truck (City Owned)
Personnel
One (1) 1,000 Gallon Engine (County Owned)
One (1) 1,800 Gallon Water Tender (County Owned)
One (1) 2,500 Gallon Water Tender (County Owned)
One (1) 1,500 Gallon Aircraft Crash Rescue Truck (County)
One (1) Medium Rescue Squad (County Owned)
One (1) Hazardous Devise (Bomb) Unit (County Owned)
Existing Demand 2015 – 17 Firefighters
Future Demand 2020 – 29 Firefighters
2025 – 48 Firefighters
2035 – 62 Firefighters
Adequacy 2015: Adequate Response Time Meets City Needs
Mitigation All new development shall be assessed and new personnel
shall be added to address increased demand.
Funding Sources Current: Property tax, sales tax, and Development Impact
Fees.
Future: Continue existing sources and explore a Fire
Suppression Assessment District and/or Special Tax.
Annual Budget $894,000 FY 14/15 (14/15 Contract for Services $869,699)
Cost Per Capita (2015) $51.63
16 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
D. Police Protection & Law Enforcement Facilities
Police facilities include the police station, and other support facilities and
equipment including patrol vehicles which are owned by the City of Imperial.
Police facilities further includes the staffing level needed to provide law
enforcement and protection services. The City has at least a minimum of two
police officers on duty per twelve hour (12) shift. Dispatching services are
contracted through the City of El Centro Police Department.
Police Protection & Law Enforcement Facilities
Performance Standard Three (3) Minute Emergency Response Time
1.6 Officers/1,000 Population (2 Officers/vehicle)
.25 Non-paid Volunteer/1,000 Population
237 SF Building/Personnel
Existing Facilities & 3,788 SF Building For Police Station
Two and a half (2 ½) Records Clerk/Support Staff
Personnel
One (1) Police Service Technician
Seventeen (17) Sworn Officers
Ten (10) Patrol Vehicles/ Six (6) Support Vehicles
One (1) Motorcycle
1 Volunteer
Existing Demand 2015: 27 Officers/14 Vehicles/6,399 SF Building
Future Demand 2020: 47 Police Officers/24 Vehicles/11,139 SF Facility
2025: 77 Police Officers/43 Vehicles/18,249 SF Facility
2035: 100 Police Officers/50 Vehicles/23,700 SF Facility
Adequacy 2015: Deficient -2,611 SF
-10 Officers
-4 Vehicles
-3 Volunteers
Mitigation Continue to monitor the response time and identify a
funding mechanism for a new police station and possible
dispatching services. Continue to obtain grants for crime
prevention services.
Funding Sources Current: Property tax, sales tax, and Development Impact
Fees as well as grant funds.
Future: Continue existing sources.
Annual Budget $2,380,204 FY 14/15
Cost Per Capita (2015) $137.48
17 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
E. Library Facilities
Library facilities include the library space at the Imperial Public Library Building
located at 200 W. 9th Street, the contents of the library, as well as the Staff that
manage the library. It also includes any support equipment such as computers,
copy machines, and other office equipment that may be available to the general
public.
Library Facilities
Performance Standard 217 SF of Building Space/1,000 Population
Existing Facilities 4,920 SF (7,674 SF After Current Expansion)
Existing Demand 3,757 SF
Future Demand 2020: 6,396 SF
2025: 10,566 SF
2035: 13,571 SF
Adequacy 2015 3,757 SF Sufficient
2025 10,566 SF D e f i c i e n t
Mitigation Maintain Efforts to obtain funding in order to continue
adequate service level.
Funding Sources Current: Property tax, sales tax, and Development Impact
Fees.
Future: Continue existing sources and explore a
Community Facilities District, Special Assessment District,
California Library Campaign Fund, Sate Public Library
Fund, and CDBG funds and user fees.
Annual Budget $210,751 FY 14/15
Cost Per Capita (2015) $12.17 per capita
F. Park and Recreation Facilities
Parks and recreation facilities include open space areas, both improved and
unimproved for the purpose of recreational use. Facility amenities within the
parks may include swings, slides, and shade structures for the use of the public.
Open Space areas owned by the City of Imperial are also included under this
discussion.
18 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
Recreational & Park Facilities
Performance Standard 3 Acres of Parkland/1,000 Population
Existing Facilities 62.87 acres
Existing Demand 51.94 Acres
Future Demand 2020: 88.43 Acres
2025: 146.08 Acres
2035: 187.62 Acres
Adequacy 2015 51.94 Acres Sufficient/10 Acre Surplus
2025 146.08 Acres Sufficient W Regional Park
Mitigation Continue to allow developers to dedicate parkland or pay
the applicable Development Impact Fees. Also continue
to pursue State and Federal Grant resources.
Funding Sources Current: Property tax, sales tax, Development Impact
Fees and user fees.
Future: Continue existing sources and explore a
Community Facilities District, Special Assessment District,
CDBG funds, and other State and Federal funds.
Annual Budget $617,592 FY 14/15
Cost Per Capita (2015) $35.67
G. Circulation and Transportation Facilities
Transportation facilities consist primarily of roadways and traffic lights, including
Local and State owned roadways. Transportation facilities may also include
pedestrian facilities such as sidewalks, bus stops and other transit facilities. The
City of Imperial maintains over 71.2 miles (Source: 2013 ICTC records) of
roadways and strives to maintain a level of service above a “C” Service level
which at minimum operates with average delays occurring but having stable
operation. This means that the volume to capacity ratio of the roadways is 0.70
to 0.79 and the stop delays range between 15.1 seconds to 25.0 seconds.
19 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
Circulation and Transportation Facilities
Performance Standard Level of Service “C” or Better
Existing Facilities 3.5 Lineal Miles of Highway
8± Lineal Miles of Major Arterials
7± Lineal Miles of Secondary Arterials
3± Lineal Miles of Industrial Collectors
50+ Lineal Miles of Residential Collectors
Existing Demand 71+ Lineal Miles of Roadway Infrastructure Management
Future Demand New Construction Within New Construction In
City Limits Annexation Areas
2020 $31,540,000 $35,250,000
2025 Unfinished 2020 $24,340,000
2035 Unfinished 2025 $ 4,580,000
Adequacy Existing streets are operating at a volume to capacity ratio
of .80 or better
Mitigation Continue to require fair share responsibility to developers
and require a traffic study where new development will
generate over 5,000 vehicle trips per day.
Current sources - General Fund, Motor Vehicle In-Lieu
Funding Sources
Tax, State Gas Tax, LTA Measure D, CalTrans Grants,
Development Impact Fee and developer fair share
contributions.
Future sources - Continue existing sources and explore
the use of citywide Community Facilities District, Special
Benefit Assessment District, Certificate of Participation,
and Grants: SAFETEA, STP and/or CDBG.
Annual Budget $306,817 FY 14/15
Cost Per Capita (2015) $17.72
H. Sanitary Sewer Facilities
Wastewater treatment and sewer facilities include the City of Imperial
Wastewater Pollution Control Plant (Wastewater Treatment Plant) and the sewer
collection system that collects and conveys the wastewater to the wastewater
treatment plant. Sanitary Sewer Facilities also includes various sewer lift stations
that are owned by the City of Imperial.
20 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
Sanitary Sewer Facilities
Performance Standard Meet or Exceed Peak Demand and NPDES Requirements
Existing Facilities 2.4 MGD Wastewater Treatment Plant
6 Miles of Force-Main Pipelines
16 Lift Stations
63 Miles of gravity main lines (6” to 24” diameter)
Existing Demand 1.731 MGD (calculated on 335 gallons per EDU)
1.4 to 1.6 MGD (actual demand)
Future Demand 2020: 7 MGD
2025: 10.5 MGD
2035: 12 MGD
Adequacy (Treatment) 2015 1.731 MGD Sufficient
2025 10.5 MGD Requires Expansion
Adequacy (Collection) Adequate
Mitigation The Imperial Wastewater Master Plan shall be followed for
all new development and annexed areas in a development
agreement that further specifies that improvements shall
be completed per Local, State and Federal Requirements.
Advance WWTP at Mesquite Lakes.
Funding Sources Current Funding - The primary sources of revenue are the
sewer service charges and sewer capacity fees.
Future Funding - Continue to use existing sources and
consider special assessment districts, community
facilities districts, local bond issuance, developer
contributions, development impact fees, and subsidizing
loans and grant programs.
Annual Budget $3,415,567 FY 14/15
Cost Per Capita (2015) $197.28
I. Domestic Water Facilities
Water treatment and distribution facilities include the City of Imperial’s Water
Treatment Plant and the distribution pipelines that convey potable water to
residences and business within the service areas. Water facilities also includes
water transmission lines and pump systems necessary for conveyance of water.
21 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN EXECUTIVE SUMMARY
Water Facilities
Performance Standard Water Treatment: Shall Meet Maximum Daily Flow
Water Storage: Maximum Average Day Demand +
2,500 GPM Fireflow (4 hour period)
Flow Velocity: 3 feet/second for peak demand and
15 feet/second for max day demand
Water Pressure: 32 psi for peak day conditions and
20-35 psi for max day conditions
Fire Flow Minimums: 1,200 GPM for residential
2,000 GPM for commercial
2,500 GPM for industrial
Existing Facilities 7 MGD Water Treatment Plant
6 MG Storage (three tanks 2 MG each)
8 Pump Stations (at four independent locations)
63 Miles of Water Pipelines (2”-16” in diameter)
Existing Demand 2.596 MGD (calculated on 502.5 gallons per EDU)
1.9 MGD (actual demand)
Future Demand 2020: 10.5 MGD
2025: 15.8 MGD
2035: 17.9 MGD
Adequacy 2015 1.9 MGD Sufficient
2025 15.8 MGD Expansion Required
Mitigation The City’s Water Master Plan shall be followed for all new
development and into annexed areas with a development
agreement for facilities that further specify improvements
shall be completed per Local State and Federal
Requirements.
Funding Sources Current Funding - The primary sources of revenue for water
treatment and distribution facilities are the water service
charges, water capacity fees and water turn on fees.
Future Funding - Continue to use existing sources as well
as consider special assessment districts, community
facilities districts, local bond issuance, developer
contributions, development impact fees, and subsidizing
loans and grants.
Annual Budget $4,439,500 FY 14/15
Cost Per Capita (2015) $256.42
22 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
LAND USES IN ANNEXATION AREAS & GROWTH PROJECTIONS
It is the intent of the City of Imperial to plan for growth via the orderly development of areas
within the City’s Sphere of Influence. Orderly development is accomplished through planned
improvements, phasing of service expansions and phasing of development projects. This
section of the Service Area Plan identifies the existing land uses, the availability of land, the
planned land uses, and the anticipated population growth which are all critical factors on how
the City will service the community.
I. LAND USES AND ANNEXATION AREAS
A. Land Uses
A land use survey was conducted for all areas within the City Limits and within the
City’s Sphere of Influence in 2014 during the City’s Housing Element Update for the
assessment of potential residential land use development opportunities. This
document incorporates those land use findings and an inventory of additional non-
residential land use designations available for development. The current City of
Imperial General Plan land use designations were used to determine the
available acreage, the future development potential for all vacant and underutilized
land, and ultimately growth projections. Please Refer to Exhibit 3 - General Plan
Land Use Map, which depicts the City’s adopted land use designations.
Findings determined that within the established City of Imperial Sphere of Influence,
there is ample opportunity for land development. Approximately 4,488 acres are
vacant and undeveloped in potential annexation areas in addition to the 979+ acres
of undeveloped land or land under development that currently exists within the City
Limits of which 640+ can support residential land uses. It is important to note that a
number of developable areas are classified as Specific Plan Areas.
Specific Plan Areas allow for a more comprehensive approach to land use planning.
The purpose of the specific plan is the systematic implementation of the general plan
for all, or part, of the covered area by the general plan and pre-determines zoning
prior to annexation. At least two Specific Plans have been recently prepared and
approved by the City of Imperial for service consideration. Table G-2 Developable
Land by Land Use distributes this acreage to specific land use designations as
adopted under the General Plan and further accounts for these Service Area Plan
areas and the remaining acreage for development.
23 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Exhibit 3 - General Plan Land Use Map
24 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Table G-2 Developable Land by Land Use
Acres Acres Total Acres
Land Use Designation
Within Outside City in Service
City Limits Limits/SOI Area
Residential Rural 129 0 129
Residential Low Density 0 811 811
Residential Single Family 263 2,050 2,313
Residential Condominium 0 0 0
Residential Apartment 8 0 8
Mobile Home Park 6 0 6
Planned Unit Development/PUD 50 0 50
Specific Plan Area 185 0 185
Agricultural 0 1,132 1,132
Village Commercial 4+ 0 4
Commercial Neighborhood 84+ 140 224+
General Industrial 100+ 0 100+
Rail Served Industrial 150+ 355 505+
TOTALS 979+ 4,488 5,467
Source: City of Imperial General Plan Land Use Map used for Land Use Designations and Google Earth used
for Acreage calculations.
B. Land Use Restrictions
Land Use restrictions are a significant factor affecting population growth and service
demand. The City’s residential land use designations provide for a wide range of
development opportunities including single-family dwellings, mobile homes,
manufactured housing, condominiums, multi-family units. These opportunities are
offered at various densities, and include mixed use development
(commercial/residential) for areas in the downtown Village Commercial Zone. The
following table identifies the densities per acre which are allowed for each land use
designation:
Table G-3 -Land Use Designation Build Out Density
GENERAL PLAN VACANT BUILD
DWELLING UNITS OUT DENSITY
LAND USE DESIGNATION PER ACRE RANGE PER ACRE
Residential Rural 0.5 – 1.0 1
Residential Low Density 1.0 – 2.0 2
Residential Single Family 2.0 – 6.0 6
Residential Condominium 5.0 – 30.0 20
Residential Apartment 20.0 – 30.0 20
Mobile Home Park 7.0 7
Agriculture .4 .4
Source: City of Imperial Zoning Ordinance, 2014
25 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
C. Annexation History & Developable Land in Incorporated Areas
The City experienced significant annexations during the housing boom of the 2000’s.
The City’s most recent annexation dates back to 2007 at which time 188 acres
designated for residential land uses were annexed into the City associated with the
Morningstar development. Other recent annexation history includes the following:
2007 Morningstar Annexation- Consisted of approximately 598
detached single family units and was approximately zero (0) percent built
out as January 2015.
2005 Mayfield Annexation- Consists of 168 lots approved of which forty
(40) percent were built out as of January 2015.
These annexations contribute to the available developable land and/or land under
development within the incorporated City Limits. Other areas within the incorporated
City Limits under development include Monterrey Park (Residential Single Family)
and Victoria Ranch (Residential Single Family/Specific Plan Overlay). There are also
over eight (8) acres of Residential Apartment and over 125 acres of Residential
Rural available throughout the incorporated city limits for in-fill development.
Table G-2 previously identified the total acreage by land use which includes all these
discussed areas. It is assumed that all these developable areas within the
incorporated City Limits will be built out within the next fifteen years and has a
projected population of 9,025 when multiplying 2,694 anticipated units by the
average household size of 3.35 persons per household (pphh).
Table G-4 City Limit Developable Units
Acres Maximum Maximum Realistic
Land Use
Density Units Units1
Residential Rural 129 1 129 103
Residential Single Family 263 6 1,578 1,262
Residential Apartment 8 20 160 128
Mobile Home Park 6 7 42 33
Village Commercial 4 12.5 50 40
PUD 50 6 300 240
Specific Plan 185 6 1,110 888
TOTALS 2,694
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
D. New Annexation Areas
Outside of the current City limits there are a total of eleven 11 areas assumed for
potential annexation and development within the next twenty (20) years. These areas
are further noted in Exhibit 4-Planning Period Annexation Areas which illustrates
the location of these annexation areas.
26 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Exhibit 4-Planning Period Annexation Areas
27 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
The proposed annexation areas are further summarized under Table G-5 City of
Imperial Annexation Areas. A more detailed summary in terms of the area’s
approximate boundary lines, the land use designations and the existing land uses
follows.
Table G-5 City of Imperial Annexation Areas
General General Anticipated
Annexation Area
Location Land Uses Timing of
Proposed Annexation
N-1 (Barioni Lakes North) North Residential/Commercial 10 Years
N-2 (Barioni Lakes West) North Residential 10 Years
N-3 (Regional Park) North Regional Park 1 Year
N-4 (Barioni Lakes Estates Phase I) North Residential/Commercial 1 Year
N-5 (HBC) North Industrial/Agriculture 5 Years
N-6 (West Neckel Development) North Residential 20 Years
NE-1 (McFarland Ranch) Northeast Agriculture/Commercial 10 Years
NE-2 (Sanchez Ranch) Northeast Residential/Commercial/Ag 5 Years
W-1 (Western Developments) West Residential 20 Years
SE-1 (Encanto Estates) Southeast Agriculture/Commercial 1 Year
SE-2 (Eas t Annexation) Southeast Industrial 5 Years
SE-3 (Cro wn Commercial/Andalusa) Southeast Residential 5 Years
SE-4 (And alusa East) Southeast Residential 20 Years
SE-5 (NE Corner of Cross Rd & Aten Rd) Southeast Residential/Commercial 10 Years
SE-6 (Sou th of Aten/East of RR Tracks) Southeast Industrial 10 Years
Within 1 Year
Annexation Area N-3, (144 Acres) - This area is anticipated to be annexed
into the City within one year and the existing land use is agricultural farming.
This area is reserved for the Regional Park and Equestrian Center. Although
the General Plan land use designation in this area consists of Residential
Single Family, there is no anticipated population impact as this area is planned
for the regional park. The boundaries for this annexation area consist generally
of the following:
North boundary line – Larsen Road
South boundary line – Ralph Road
East boundary line – La Brucherie Road
West boundary line – Nance Road
Annexation Area N-4, (186 Acres) - This area is anticipated to be annexed
into the City within one year of Service Area Plan adoption. This area is known
as Barioni Lakes Phase I and the boundaries for this annexation area consist
generally of the following:
28 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
North boundary line – Larsen Road
South boundary line – Ralph Road
East boundary line – Highway 86
West boundary line – La Brucherie Road
The current land use is a single family home and agricultural farming. The
General Plan land use designation in this area consists of Residential Single
Family and Commercial Neighborhood. The acreage is distributed in the
following table with an estimated population projection of 2,348 based on 701
realistic units x 3.35 pphh.
Land Use Acreage Density Realistic Population
Maximum Units¹
Residential Single Family 146 6 701 2,348
Commercial Neighborhood 40 0 0 0
Total Projected Population: 701 2,348
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
Annexation Area SE-1, (320 Acres)– This area is commonly referred to as
Encanto Estates. The existing land use is agricultural farming. This area is
proposed for annexation into the City within one (1) year and the boundaries
of this annexation area consist generally of the following:
North boundary line –Worthington Road
South boundary line – Huston Road
East boundary line – Dogwood Road
West boundary line – “P” Street/Clark Road
The General Plan land use designation in this area is Agriculture and
Commercial Neighborhood. The acreage is distributed between agriculture
and commercial neighborhood as noted in the proceeding table with an
estimated population projection of 332 based on 99 Realistic Units x 3.35 pphh:
Land Use Acreage Density Realistic Population
Maximum Units¹
Agriculture 310 0.4 99 332
Commercial Neighborhood 10 0 0 0
Total Projected Population: 99 332
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
29 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Within 5 Years
Annexation Area N-5, (163 Acres) – This area is often referred to as the
HBC area and is proposed for annexation into the City within five (5) years.
The existing land use is industrial, three single family homes and agricultural
farming and the boundaries of this annexation area consist generally of the
following:
North boundary line –Larsen Road
South boundary line – Ralph Road
East boundary line – Clark Road
West boundary line – State Highway 86
The General Plan land use designation in this area is Rail Industrial and
Agriculture and a minimal population impact is anticipated. The acreage is
distributed as follows with an estimated population projection of 53 based on 16
realistic units x 3.35 pphh = 53 persons:
Land Use Acreage Density Realistic Population
Maximum Units¹
Rail Served Industrial 111 0 0 0
Agriculture 52 0.4 16 53
Total Projected Population: 16 53
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
Annexation Areas NE-2, (620 Acres) – This area is commonly known as the
Sanchez Ranch Area. This area is proposed for annexation into the City
within five (5) years. The existing land use is agricultural farming and the
boundaries of this annexation area consist generally of the following:
North boundary line –Neckel Road
South boundary line – Worthington Road
East boundary line – Dogwood Road
West boundary line – Clark Road
The General Plan land use designation in this area is Residential Single
Family, Agriculture and Commercial Neighborhood. The acreage is distributed as
follows with an estimated population projection of 2,904 based on 867 units x
3.35 pphh.
30 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Land Use Acreage Density Realistic Population
Maximum Units¹
Residential Single Family 150 6 720 2,412
Agriculture 460 0.4 147 492
Commercial Neighborhood 10 0 0 0
Total Projected Population: 867 2,904
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
Annexation Area SE-2, (84 Acres) - This area is just east of the Mid-Winter
Fairgrounds and Felix Trucking and is anticipated to be annexed into the City
within a 5-year period. The existing land uses consist of two single family
homes, agricultural farming and liquid storage tanks. The General Plan land
use designation in this area consists of Rail Served Industrial with no direct
population impact anticipated. The boundaries for this annexation area consist
of the following:
North boundary line - 1st Street
South boundary line - Southern property line of APN 044-200-081
East boundary line - Clark Road
West boundary line – Union Pacific Railroad Tracks
Annexation Area SE-3, (310 Acres) - This area has also been referred to
as the Crown Commercial Andalusia Area and is proposed for annexation into
the City within five (5) years. The existing land uses consist of one single
family detached home, agricultural farming and vacant land. The General
Plan land use designation in this area is Residential Single Family and has a
population projection of 4,985 based on 1,488 realistic units at 80% of the
maximum density multiplied by 3.35 persons per household. The boundaries
for this annexation area consist of the following:
North boundary line - Huston Road
South boundary line – Southern property line of APN 044-200-095 & 019
East boundary line - Eastern property lines of 044-200-019
West boundary line - Clark Road
Within 10 Years
Annexation Area N-1, (370 Acres) - This area is anticipated to be annexed
into the City within a 10-year period and will be referred to as Barioni Lakes
North. The existing land use is three single family homes and agricultural
farming and the boundaries for this annexation area consist generally of the
following:
31 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
North boundary line – Harris Road and Lydick Loop
South boundary line – Larsen Road
East boundary line – Highway 86
West boundary line – Nance Road
The General Plan land use designation in this area consists of Residential
Single Family and Neighborhood Commercial. The acreage is distributed as
follows with an estimated population projection of 4,985 based on 1,488
realistic units x 3.35 pphh.
Land Use Acreage Density Realistic Population
Maximum Units¹
Residential Single Family 310 6 1,488 4,985
Commercial Neighborhood 60 0 0 0
Total Projected Population: 1,488 4,985
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
Annexation Area N-2, (390 Acres) - This area is anticipated to be annexed
into the City within a 10-year period and will be referred to as Barioni Lakes
West. The General Plan land use designation in this area consists of
Residential Single Family and has a population potential of 6,271 based on a
maximum density of 6 units per acre built at a realistic 80% ratio. A total of
1,872 realistic unit development was multiplied by the average 3.35 persons per
household for an anticipated 6,271 population growth. Current land uses
consist of six single family homes and agricultural farming and the boundaries
for this annexation area consist generally of the following:
North boundary line – Larsen Road
South boundary line – Neckel Road
East boundary line – Nance Road and La Brucherie Road
West boundary line – Austin Road
Annexation Area NE-1, (320 Acres)– This area is commonly referred to as
McFarland Ranch. This area is proposed for annexation into the City within
ten (10) years. The existing land use is and agricultural farming and the
boundaries of this annexation area consist generally of the following:
North boundary line –Neckel Road
South boundary line – Short Road
East boundary line – Dogwood Road
West boundary line – Sanchez Ranch Annexation Area
32 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
The General Plan land use designation in this area is Agriculture and
Commercial Neighborhood. The acreage is distributed in the following table
with an estimated population projection of 332 based on 99 realistic units
multiplied by 3.35 persons per household.
Land Use Acreage Density Realistic Population
Maximum Units¹
Agriculture 310 0.4 99 332
Commercial Neighborhood 10
Total Projected Population: 99 332
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
Annexation Area SE-5, (320 Acres) - This area is proposed for annexation
into the City within 10 years. The existing land uses consist of five single
family detached homes, mobile homes, a small industrial building,
agricultural farming and vacant land and the boundaries for this annexation
area consist of the following:
North boundary line - Northern property line of 044-200-025, 091 & 096
South boundary line – Aten Road
East boundary line - Dogwood Road
West boundary line - Cross Road
The General Plan land use designations in this area are Residential Single
Family and Neighborhood Commercial. The acreage is distributed as follows
with an estimated population projection of 4,985 based on 1,860 realistic units
multiplied at 3.35 per household.
Land Use Acreage Density Realistic Population
Maximum Units¹
Residential Single Family 310 6 1,860 4,985
Commercial Neighborhood 10 0 0 0
Total Projected Population: 1,860 4,985
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
Annexation Area SE-6, (160 Acres) - This area is anticipated to be
annexed into the City within a 10-year period. The General Plan land use
designation in this area consists of Rail Served Industrial with no anticipated
population impact. The existing land uses consist of a pipeline company,
shooting range, a fertilizer company, the S.P. Rail Road, and warehouse
storage and the boundaries for this annexation area consist of the following:
33 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
North boundary line - Aten Road
South boundary line - Central Drain
East boundary line - Eastern property line of APN 044-220-46
West boundary line - Western property line of APN 044-220-26, & 48
Within 20 Years
Annexation Area N-6, (50 Acres) - This area is anticipated to be annexed
into the City within a 20-year period. The General Plan land use designation
in this area consists of Residential Single Family and has a population
projection of 804 based on a maximum density of six units per acre and applied
an 80% realistic build-out. The existing land uses consist of farm ground and
the boundaries for this annexation area consist of the following:
North boundary line – Ralph Road
South boundary line – Neckel Road
West boundary line – City Limits/Union Pacific Railroad Tracks
East boundary line – Clark Road
Annexation Area W-1, (891 Acres) - This area is anticipated to be annexed
into the City within a 20-year period. The existing land uses consists of single
family detached homes and mobile homes and the boundaries for this
annexation area consist of the following:
North boundary line - Neckel Road
South boundary line – Brewer Road
East boundary line –West Boundary of APN 063-047-017 & 063-054-011
West boundary line - Austin Road
The General Plan land use designation in this area largely consists of
Residential Low Density but does include some Residential Single Family.
The acreage is distributed as follows with an estimated population projection
of 5,631 based on 1,681 realistic units multiplied by an average of 3.35 person
per household.
Land Use Acreage Density Realistic Population
Maximum Units¹
Low Density Residential 811 2 1,297 4,345
Residential Single Family 80 6 384 1,286
Total Projected Population: 1,681 5,631
1Realistic Units was derived by calculating 80% of the maximum dwelling units.
34 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Annexation Area SE-4, (160 Acres) - This area is anticipated to be
annexed into the City within a 20-year period. The General Plan land use
designation in this area consists of Residential Single Family and has a
population projection of 2,573 based on a maximum density of six units per acre
and applied an 80% realistic build-out. The anticipated realistic units would be
768 multiplied by 3.35 persons per household for an estimated population of
2,573 persons. The existing land uses consist of the old Lulu Belle site and
farm ground and the boundaries for this annexation area consist of the
following:
North boundary line - Huston Road
South boundary line – Northern property line of 044-200-025
East boundary line – Dogwood Road
West boundary line - Western property line of 044-200-020
E. Phasing of Development
The Phasing of annexation areas provides a pattern and estimate for where and
when development within the areas of annexation will be phased into the
City of Imperial. This projection provides City leadership with a phased
estimated growth that can be strategically planned for. For the purpose of
this assessment it was determined to combine growth areas per five year
increments.
Although phasing is difficult to predict with precision, projecting is beneficial for
the planning of public facilities to ensure that the level of service standards are
continually met. It becomes more difficult to predict phasing beyond the ten year
mark, thus in summary most of the residential growth was projected within the
ten year plan or at twenty years. The phasing, acreage, and realistic residential
units of all planned development is further summarized under Table G-6 by
annexation area and phasing term.
35 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Table G-6 Annexation Areas as Phased Residential Units
Development/ Realistic
Area Acres Phasing
General Land Use Units ¹
N-3 Regional Park & Equestrian 144 1 year 0
Center/ Recreational Park
N-4 Barioni Lakes Phase I/ 186 1 year 701
Residential & Commercial
SE-1 Encanto Estates/ 320 1 year 99
Agriculture & Commercial
N-5 HBC/ 163 5 years 16
Agriculture & Industrial
NE-2 Sanchez Ranch/ 620 5 years 867
Ag, Residential, & Commercial
SE-2 East Annexation/ 84 5 years 0
Industrial
SE-3 Crown Commercial/ 310 5 years 1,488
Residential
Subtotal 1,827 5 Years 3,171
N-1 Barioni Lakes North/ 370 10 years 1,488
Residential & Commercial
N-2 Barioni Lakes West/ 390 10 years 1,872
Residential
NE-1 McFarland Ranch/ 320 10 years 99
Agriculture & Commercial
SE-5 NE Corner of Cross & Aten/ 320 10 years 1,488
Residential & Commercial
SE-6 South of Aten/East of RR Tracks/ 160 10 years 0
Industrial
Subtotal 1,560 10 Years 4,947
W-1 Western Development/ 891 20 years 1,681
Residential
N-6 West Neckel Development/ 50 20 years 240
Residential
SE-4 Andalusiaa East/ 160 20 years 768
Residential
Subtotal 1,101 20 Years 2,689
GRAND TOTAL 4,488 10,807
¹Methodology: The acreage in each development was multiplied by the maximum density allowed for the
corresponding land use and by 80% to discount roadways, parks and retention basins and get realistic units.
36 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
II. GROWTH PROJECTIONS
Annexation, thus growth, is influenced by land use restrictions, existing conditions, and
availability of service at developable locations. The location of the development is typically
market and public improvement cost driven. The City of Imperial has undertaken several
initiatives to encourage development including the adoption of one of the lowest
development impact fees in the County. In July 2004, the City also passed a Planned-Unit
Development Ordinance to further encourage infill development. The City also attracts
development into the community by providing a high level of customer service and an
efficient project review process. The proceeding sections provide an overview of the City’s
land use restrictions and growth projections for development areas.
A. Maximum Land Use Densities
As previously noted, the growth projections in the proceeding sections have
assumed the maximum densities allowed. Additionally an 80% realistic maximum
development ratio has been applied for population projections. This discounted
density is a conservative calculation in order to discount for land areas that will not
have residential use because those areas more than likely that will be used for public
improvements such as roadways, parks, retention basins, and other similar facilities
that impact the developable land ratio.
B. Residential Growth Projections
The residential growth projections provide the anticipated future residential
development based on the most current land use designations and their allowable
densities as previously discussed. The land use designations for the Sphere of
Influence are based on the current City of Imperial General Plan, as shown by
Exhibit 3 - General Plan Land Use Map on page 24, as well as the development
proposed for the annexation areas. An average household size of 3.35 persons per
household was used to calculate population projections from any given total number
of dwelling units. Base information was obtained from assessor parcel maps, the City
of Imperial General Plan, an on-site land use survey, the California Department of
Finance and building permit information through December 2014 as referenced
below.
1. Existing Dwelling Units in SOI
All the existing dwelling units within the sphere of influence were
determined by 2010 Census base numbers and subsequent building permits
through December 2014 for the incorporated City limits. The existing
dwelling units included single family detached dwellings, mobile homes and
multi-family residential units. It was determined that there were 5,168
existing dwelling units within the City limits as of December 2014. The
corresponding population is 17,313 persons. It was also determined in the
37 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
2007 Service Area Plan that there were a total of 58 existing dwelling units
in the annexation areas within the Sphere of Influence, excluding the W-1
Western Development not previously accounted for as an annexation area.
Based on the 2007 City of Imperial Service Area Plan, and no new residential
development within the unincorporated areas, and the estimated existing
population of 1,222 in the now planned for W-1 Western Development
Annexation Area (365 units x 3.35 pphh), a total of 5,591 existing dwelling
units are estimated within the entire Sphere of Influence area as of
December 2014, as summarized in the table below, for an estimated
population of 18,729.
Table G-7 Existing Dwelling Units
Existing Units Existing Existing
Residential Land Uses
Inside City Units in Dwelling
Limits Annexation Units in
Areas SOI
Residential Low Density 0 365 365
Residential Single Family 4,529 58 4,587
Residential Multi-Family 542 0 542
Residential Condominium 63 0 63
Mobile Home Park 34 0 34
Totals 5,168 423 5,591
Source: City of Imperial General Plan Land Use Map was used for Land Use designation, City of Imperial
2007 Service Area Plan was used for Existing Units up to 2007, and Residential Building Permits from
2007-2015 were used to determine all additional existing units.
2. Future Dwelling Units in SOI
Future dwelling units were calculated by adding the number of vacant and
underutilized acres for sites both within the incorporated City Limits and in
Annexation Areas, grouped into land use, and multiplying that summation by
the allowed density per acre (Vacant Build Out Density) and applying the
80% realistic maximum build-out as a conservative ratio. The formula used to
obtain this figure is as follows:
(Developable Acres¹ x Vacant Build Out Density) x 80% =
Realistic Future Dwelling Units
¹Developable Acres is Vacant & Underutilized Acres
Based on the density allowances and the annexation assumptions in this
report, and as depicted in Table G-8 Future Dwelling Units, the
incorporated areas could accommodate approximately 2,694 additional
residential units and the annexation areas could accommodate approximately
10,807 including existing development within unincorporated area. The total
additional future dwelling unit count for all areas within the City limits and the
annexation areas is estimated to be 13,501 additional units as noted in the
table below for an estimated population growth of 45,228 by year 2035.
38 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Table G-8 Future Dwelling Units
Residential Phasing Future Units Future Units Realistic
Land Uses Inside City Annexation Future
Limits Areas1 Units
Residential Single Family 5 Years 420 2,909 3,329
Agriculture 5 Years 0 262 262
Village Commercial 5 Years 40 0 40
Subtotal 5 Years 460 3,171 3,631
Residential Single Family 10 Years 421 4,848 5,269
Agriculture 10 Years 0 99 99
Residential Apartment 10 Years 128 0 128
Planned Use Development 10 Years 240 0 240
Subtotal 10 Years 789 4,947 5,736
Residential Single Family 15 Years 421 0 421
Mobile Home Park 15 Years 33 0 33
Residential Rural 15 Years 103 0 103
Specific Plan 15 Years 888 0 888
Subtotal 15 Years 1,445 0 1,445
Residential Low Density 20 Years 0 1,297 1,297
Residential Single Family 20 Years 0 1,392 1,397
Subtotal 20 Years 0 2,689 2,689
Grand Total 2,694 10,807 13,501
1Realistic Units in Annexation areas includes the 423 existing units in the annexation areas, as noted in Table G-7
3. Build Out Dwelling Units in SOI
Combining the existing dwelling units (5,591) and projected future dwelling
units (13,501), and discounting the existing units in the annexation area (423)
from projected future dwelling units, results in a total build out dwelling
unit projection of 18,669 dwelling units for the entire Sphere of Influence by1
2035, as summarized in Table G-9 - Build-Out Dwelling Units. The build
out population for vacant parcels within the incorporated City limits is 9,025.
The build-out population for vacant parcels within the annexation areas is
36,203. The build out units for the City of Imperial once all areas within the
sphere of influence have been annexed and developed is estimated to total
13,501, (the combination of existing units, build out of incorporated areas, and
build out of annexation areas provides a grand total of 18,669 units or 62,541
persons based on 3.35 persons per household). Table G-10 Build-Out
Population Projections summarizes the build-out dwelling units and
corresponding populations in five year increments.
39 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Table G-9 Build-Out Dwelling Units
Existing Realistic Build-Out
Residential Land Uses
Dwelling Units SOI Future Dwelling
Entire SOI Dwelling Units
Units Entire SOI
Residential Low Density 365 932 1,297
Residential Single Family 4,587 10,353 14,940
Residential Multi-Family 542 0 542
Residential Condominium 63 0 63
Agriculture 0 361 361
Mobile Home Park 34 33 67
Village Commercial 0 40 40
Residential Rural 0 103 103
Residential Apartment 0 128 128
Planned Use Development 0 240 240
Specific Plan 0 888 888
Totals 5,591 13,078 18,669
The 423 Existing Dwelling Units in the Annexation Areas, as noted in Table G-7 – Existing Dwelling Units,
are included in the Existing Dwelling Units Entire SOI and discounted from Realistic SOI Future Dwelling
Units to prevent double counting.
Table G-10 Build-Out Population Projections
Realistic Cumulative Cumulative
Base Year & Beyond
Dwelling Units Dwelling Population
Units
Jan 2015 5,168 5,168 17,313
2014 – 2020 3,631 8,799 29,476
2021 – 2025 5,736 14,535 48,692
2026 – 2030 1,445 15,980 53,533
2031 - 2035 2,689 18,669 62,541
Totals 18,669 62,541
The City’s service demand further compares growth between the application of a
traditional growth rate on base population number to anticipated growth
associated with specific annexation areas. The population projections that follow
are based on historic population growth rates in comparison to growth tied to
anticipated projects. For the Imperial population projections, a growth rate of
2.23 percent has been determined as adequate. This growth rate is a modest
rate to apply to the projected population growth for the Imperial community for
the entire twenty (20) year planning period analyzed under this Service Area
Plan. Planned development as noted in the prior discussions may significantly
alter these population growth projections. Projections are therefore discussed as
probable scenarios affecting service demand assuming maximum growth
scenario thus planned development.
40 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
Figure G-1 – Population Projections for the City of Imperial depicts a gradual
population growth of 2.23 percent that would reasonably place the Imperial
population at 26,923 at the 20 year mark and compares it to population growth
with approved and planned development. If there are changes in the real estate
market and the regional development demand increases, the City will likely be
directly impacted by new growth and expansion outside of the current City
boundary within the Sphere of Influence and more in line with the aforementioned
approved and planned development projections and reach 62,541 at the end of
the twenty year plan period.
Figure G-1 Population Projection for the City of Imperial
70000
65000
60000
55000
50000
45000
40000
35000
30000
25000
20000
15000
10000
5000
2015 2020 2025 2030 2035
Population With Approved & Planned Development
Population Using 2.23% SCAG Growth Rate
“Population with Approved & Planned Development” calculated by determining realistic number of dwelling units
from planned development and multiplying by 3.35 person per household. “Population Using 2.23% SCAG
Growth Rate” based on SCAG 2012-2035 Regional Transportation Plan
C. Non-Residential Development
Non-residential projects also impact most community facilities and services. Non-
residential projects include government operations, industrial, business/office use,
and commercial land uses. Non-residential development is first calculated in square
footage and commonly converted into Equivalent Dwelling Units for the purpose of
assessing demand on facilities such as wastewater and water. The methodology for
obtaining existing and future non-residential square footage is similar to that of the
residential projections in that a coverage factor is assigned.
41 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
a). Existing Non-Residential Square Footage in City Limits
The nonresidential square footage within the City limits was estimated to be
4,132,793 square feet in 2007. Since then, and over a five year period, a total of
47,158 square feet of commercial and industrial space has been constructed
within the incorporated City Limits, per City of Imperial building permit records.
This number represents .01% of the total non-residential square footage at the
beginning of that time period. The existing non-residential square footage within
the City Limits is currently estimated at 4,179,951 square feet.
b). Existing Non-Residential Square Footage in Annexation Areas
The nonresidential square footage within the annexation areas was estimated to
be 397,449 square feet in 2007. Since then, an estimated total of 50,427 square
feet of commercial and industrial space has been constructed within the
Annexation areas (Imperial County Building Permit Records), thus the existing
nonresidential square footage within the annexation areas is currently estimated
at 447,876 square feet.
1. Future Non-Residential Growth Projections
The vacant coverage factor for commercial and industrial uses for future
development is 30%. The reason for the reduction from 40% for existing
development to future development is that a coverage factor of 30% accounts
for reductions of buildable land area for street and utility land dedications, as well
as parking and landscaping requirements that essentially decrease the amount
of square footage that can be developed.
a). Future Non-Residential Square Footage in City Limits
The future nonresidential square footage within the City limits was estimated
to be 10,181,031 square feet under the 2007 Service Area Plan. Considering no
changes in zoning to affect this estimate, and deducting the 47,158 square feet of
commercial space constructed since then, it is estimated that 10,133,873 of future
non-residential square footage should be planned for
b). Future Non-Residential Square Footage in Annexation Areas
The future nonresidential square footage within the annexation areas was
estimated to be 10,651,712 square feet under the 2007 Service Area Plan. At
the direction of the City, an increase adjustment was made in 2015 to increase
the amount of non-residential development along major arterial intersections.
These changes resulted in a square footage base number of 11,344,826 square
feet. Since the Castle Arch Annexation was removed, which accounted for
84,942 square feet of planned commercial and an additional 50,427 square feet
of commercial and industrial space have further been constructed within the
unincorporated sphere of influence (as per Imperial County Building permits), a
total of 135,369 square feet were deducted from the 11,344,826 to give an
42 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
estimated total of 11,209,457 of future non-residential square footage within the
annexation areas to be planned for.
2. Build-out Non-Residential Projections
Combining the existing nonresidential inventory with the future nonresidential
projections, the total nonresidential build out projections were determined.
The total build-out non-residential square footage within the sphere of
influence including all existing square footage is estimated to be 25,971,157
square feet as denoted in the following tables.
Table G-11 Build-Out Non-Residential Square Feet In SOI
City Limits Land Use Existing Future Build-Out
Development Development Development
Within City Within City City Limits
Village Commercial 172,225 40,066 212,291
Neighborhood Commercial 417,276 951,463 1,368,739
Commercial Regional 328,329 525,623 853,952
Commercial Office 1,078,720 1,559,012 2,637,732
General Industrial 660,369 5,495,219 6,155,588
Rail Served Industrial 1,159,978 1,925,544 3,085,522
Subtotal 4,179,951 10,133,873 14,313,824
Annexations Land Use Existing In Future In Buildout In
Annexation Annexation Annexation
Areas Areas Areas
Neighborhood Commercial 11,260 1,881,900 1,893,160
Commercial Regional 33,242 2,885,676 2,918,918
General Industrial 0 0 0
Rail Served Industrial 403,374 6,441,881 6,845,255
Subtotal 447,876 11,209,457 11,657,333
TOTAL SF in SOI 4,627,827 21,343,330 25,971,157
Data Based on 2007 Base Numbers and Building Permits by Zone. All calculations done in square feet.
3. Equivalent Dwelling Unit Phasing of Non-Residential Development
Non-residential uses need to be converted to “equivalent dwelling units” for the
purpose of preparing a comprehensive analysis. This assessment is applying
1.5 EDU’s for every 1,000 square feet of non-residential space. This number is
an unscientific average and the City of Imperial, adopted Resolution 90-16,
should be referred to for a more precise assignment of equivalent dwelling units
for non-residential land uses (for the purpose of assessing impacts to wastewater
and water facilities). A very conservative assumption is further being made that
the non-residential development within the City Limits will develop at an average
of 1% of planned commercial space for every five year period. The following
Table G-12 projects the timing of non-residential development in five year
increments and the corresponding conversion into equivalent dwelling units (1.5
43 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
EDU’s per every 1,000 SF of nonresidential space) for the same time periods.
Table G-12 City and Annexation Non-Residential Development
As Phased Equivalent Dwelling Units (EDU’s)¹
Development/ Square
Area Phasing EDU’s¹
General Land Use Feet
Regional Park & Equestrian
N-3 1,881,900 1 year 2,822
Center/ Recreational Park
Barioni Lakes Phase I/
N-4 522,600 1 year 784
Residential & Commercial
Incorporated Areas
City 41,799 5 years 62
All Non Residential
HBC/
N-5 2,620,918 5 years 3,931
Agriculture & Industrial
Sanchez Ranch/
NE-2 130,680 5 years 196
Ag, Residential, & Commercial
Encanto Estates/
SE-1 1,186,836 1 year 1,780
Agriculture & Commercial
East Annexation/
SE-2 1,730,083 5 years 2,595
Industrial
Crown Commercial/
SE-3 0 5 years 0
Residential
Subtotal 8,114,846 5 Years 12,170
Incorporated Areas
City 41,381 10 years 62
All Non Residential
Barioni Lakes North/
N-1 784,200 10 years 1,176
Residential & Commercial
Barioni Lakes West/
N-2 0 10 years 0
Residential
McFarland Ranch/
NE-1 130,680 10 years 196
Agriculture & Commercial
NE Corner of Cross & Aten/
SE-5 130,680 10 years 196
Residential & Commercial
South of Aten/East of RR
SE-6 2,090,880 10 years 3,136
Tracks/ Industrial
Subtotal 3,177,821 10 Years 4,766
Incorporated Areas
City
All Non Residential
40,967 15 years 61
Subtotal 40,967 15 Years 61
Incorporated Areas
City 40,558 20 years 60
All Non Residential
Western Development/
W-1 0 20 years 0
Residential
West Neckel Development/
N-6 0 20 years 0
Residential
Andalusiaa East/
SE-4 0 20 years 0
Residential
Subtotal 40,558 20 Years 60
Incorporated Areas
City² 9,969,168 25+ Years 0
All Non Residential
GRAND TOTAL 21,343,360 17,057
¹Calculated at 1.5 EDU’s per every 1,000 SF
2Due to the conservative assumption of a 1% development within City Limits, there is a remainder of
9,969,168 SF of possible future development that is not included in EDU calculations.
44 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
D. Growth Projection Summary
Table G-13 – EDU Projections for City of Imperial separates the population
projections in five year intervals, after considering phased development into the
projected population growth beyond the 2.23 percent growth rate for planned
residential development, and planned residential development as total dwelling
units, while Table G-14 summarizes the population growth as dwelling units with
the non-residential equivalent dwelling units.
Table G-13
Population Projections for City of Imperial/SOI
Year Population at 2.23 % Population With Total Dwelling
Growth Rate Approved Development Units
2015 17,313 17,313 5,168
2020 19,766 29,476 8,799
2025 22,072 48,692 14,535
2030 24,648 53,533 15,980
2035 26,923 62,541 18,669
Table G-14
EDU’s for City of Imperial/SOI
Year Total Planned Planned Cumulative Total Equivalent
Cumulative Non-Residential Dwelling Units
Development Equivalent Dwelling
Dwelling Units Units
2015 5,168 0 5,168
2020 8,799 12,170 20,969
2025 14,535 16,936 31,471
2030 15,980 16,997 32,977
2035 18,669 17,057 35,726
45 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LAND USE IN ANNEXATION AREAS & GROWTH PROJECTIONS
PUBLIC FACILITIES AND SERVICES
This plan will address how public facilities and services will be provided to the City of Imperial
and the Annexation Areas over the course of the 20-year planning period. An analysis of the
following facilities and services are provided in this document:
Administrative Facilities - City of Imperial
Drainage Facilities - City of Imperial/Imperial Irrigation District
Fire Protection Facilities - County of Imperial (via contract)
Police Protection - City of Imperial
Library Facilities - City of Imperial
Park and Recreational Facilities - City of Imperial
Circulation Facilities - City of Imperial
Sanitary Sewer Facilities - City of Imperial
Domestic Water Facilities - City of Imperial
Each facility is analyzed in detail based on the standards developed by LAFCO for Service
Area Plans. Each facility analysis is divided into four sections as follows:
Performance Standard: A description of the desired level of service that a public facility
must provide.
Facility Planning and Adequacy Analysis: A description of the existing facilities, the
current adequacy of the facilities, the future demand for facilities and the phasing of the
demand for facilities as follows:
Inventory of Existing Facilities
Inventory of Approved Facilities
Growth Demand for Facilities
Buildout/Phasing of Facilities
Mitigation: A series of recommendations to ensure that adequate facilities will be
provided.
Financing: An explanation and identification of how the service and facilities are
currently being funded, including a per capita cost, and how future services and facilities
may be funded.
Each section will provide a description of the nature of each service to be provided, a description
of the service level capacity and demonstrate that adequate services will be provided within the
demanded time frame. Presentations of maps that clearly indicate the location of existing and
proposed facilities are provided for each facility. Discussion of any conditions which may be
imposed or required within the affected territory are also noted.
46 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN ADMINISTRATION
I. ADMINISTRATION
City of Imperial administrative facilities include City Hall and office buildings that house
administrative staff and provide general administrative services to Imperial residents and
the business community. Examples of administrative services include utility billing and
collection, clerk services, planning and development services and other administrative
functions of the City.
A. Performance Standard
The performance standard for administrative services was determined during
the preparation of the Service Area Plan approved by LAFCO on January
25, 2001. It was based on the existing administrative facilities square footage
and the existing population at the time of the preparation of the Service Area
Plan. It was determined at that time that the building area available was
efficient and appropriate. Therefore, the performance standard was set at 842
square feet per 1,000 in population.
B. Facility Planning and Adequacy Analysis
This analysis provides an inventory of the existing City Administrative Facilities
owned by the City of Imperial, the existing and future demand for facilities as
well as a projected phasing schedule. The purpose of this analysis is to
determine if the existing facilities are adequate for the existing and future
demand, and if not adequate, to identify approximately when additional facilities
will be needed in order to meet future demand identified within the 20 year time
frame.
1. Inventory of Existing Facilities
The City of Imperial City Hall is located at 420 South Imperial Avenue.
The existing administrative facilities consist of a total of 9,888 square
feet and centrally located as noted in Exhibit 5-Administration Facilities
Map. This square footage is broken down into the following categories:
Table-A-1 Administration Facilities
City Clerk 306 SF
City Hall 2,523 SF
City Manager 866 SF
Legislative 1,000 SF
Community Center 2,568 SF
Parks & Recreation 288 SF
Senior Center 2,337 SF
Total 9,888 SF
47 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN ADMINISTRATION
Exhibit 5- Administration Facilities
48 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN ADMINISTRATION
2. Adequacy of Existing Facilities
The City has $200,000 budgeted for City Hall Improvements over the next
three years. Funds, however, are to improve existing facilities and not for
expansion beyond the currently available 9,888 SF. Using the
performance formula provided below, the existing demand for
administrative facilities is 14,577 square feet.
Existing Population x Performance Standard = Current Demand
17, 313 Population x 842 Sq. Ft / 1,000 population = 14,577 Sq. Ft.
Existing Facilities – Current Demand = Adequacy
9,888 Sq. Ft. – 14,577 Sq. Ft. = -4,689 Sq. Ft.
Based on the performance standard formula, there is a deficiency of
4,689 square feet of administrative building square footage. As the
population increases, there will be an inherent need for additional City
administrative facilities.
3. Future Demand for Facilities
For the purpose of calculating future demand, and as previously noted,
planned development is used to project population. Using the existing
performance standard formula, the City of Imperial will need 52,659
square feet of administrative space by the year 2035 if all development is
constructed as planned. When using solely the historical growth rate, the
demand for administrative facilities could be reduced to 22,669 square
feet for 2035.
4. Opportunities for Shared Facilities
The City of Imperial provides for all of its City administrative needs using
full-time, part-time and contract workers. Assistance from other
jurisdictions for administrative services is not provided nor will be
provided, but cross-utilization of services within the jurisdiction is
facilitated. There are many staff members who provide their expertise in
public facilities and services that are outside of the administrative
services arena such as in circulation, water and wastewater. For
example, the City Manager, Community Development Director and
several other employees of the City will complete tasks that are not a
part of the administrative services, but are directly related to the
specific needs of various public services that the City provides. These
tasks are funded through the individual budgets of the various
departments for which the tasks are being completed. This method of
cross-utilization is an efficient use of existing resources especially for
49 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN ADMINISTRATION
small jurisdictions such as the City of Imperial.
5. Phasing
The following Table A-2 Administration Facilities Demand represents
the demand for administrative facilities square footage for the next 20
years in five year increments. The population noted is using planned
development for projections.
Table A-2 Administrative Facilities Demand
Year Population Demand Adequacy
2020 29,476 24,818 SF Deficient
2025 48,692 40,998 SF Deficient
2030 53,533 45,074 SF Deficient
2035 62,541 52,659 SF Deficient
C. Mitigation
On a yearly basis, the City of Imperial should review the facilities provided
against the demand for facilities based on the performance standard. Additional
facilities should be planned for and provided on an as needed basis. The City
should implement the following mitigation measures for administrative facilities:
A-1 On a yearly basis, the City of Imperial shall review the
facilities provided against the demand for facilities based
on the performance standard.
A-2 By the year 2025 (10 year time period), a minimum of
35,186 additional square feet of administrative facilities
shall be provided to meet demand through 2030.
D. Financing
Information regarding Project costs was determined by using the most current
adopted budget (See Appendix A). The current revenue source for administrative
facilities includes property tax and sales taxes, licenses and permits, fine and
penalties, charges for services, Development Impact Fees and other
miscellaneous sources.
1. Funding Sources and Per Capita Cost
The 2014-2015 City of Imperial Budget identifies approximately
$4,107,978 for the continued operation of administrative facilities.
50 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN ADMINISTRATION
There are approximately $1,786,660 in functional revenues (charges for
services, licenses) used to help pay for the administrative services.
These functional revenues must be subtracted from the expenditures in
order to determine the true costs to the general public. Therefore, the
cost to the general public through taxation for administrative services is
$2,321,318.
$2,321,318 / 17,313 population = $134.08 per capita
Using the City’s current population, and a constant per capita cost of
$134.08, the future costs are noted in the following table in five year
increments. These estimations assume a constant cost per capita in the
year 2014 dollars and the provided population projections.
Table A-3 Projected Administrative Costs
Year Projected/Planned Administrative Costs
Population
2020 29,476 $3,952,126.69
2025 48,692 $6,528,597.94
2030 53,533 $7,177,676.69
2035 62,541 $8,385,497.28
2. Future Funding Sources
The City of Imperial will continue to use the existing funding sources for
the maintenance and operation of City administrative facilities. However,
due to the future growth anticipated, other funding sources for capital
improvements will be needed. Other funding sources that may be
available for capital improvements include general obligation bonds or a
City wide community facilities district. Further descriptions of the financing
mechanisms are provided in the Financing section of this Service Area
Plan.
51 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DRAINAGE & STORMWATER
II. DRAINAGE AND STORMWATER
The primary purpose of maintaining, planning, designing and constructing drainage
facilities is to control flooding. Drainage facilities in the entire Imperial Valley are within
the jurisdiction of the Imperial Irrigation District (IID). In conjunction with an irrigation
network that includes more than 1,600 miles of canals, IID operates and maintains an
agricultural drainage system consisting of more than 1,400 miles of surface drains. The
City of Imperial discharges into IID drains which ultimately drain into the Alamo River, a
tributary to the Salton Sea. It should be noted, however, that the primary drainage
system managed by IID is not designed to convey all stormwater runoff from urbanized
areas. Therefore, new development must provide for on-site retention of stormwater to
mitigate against stormwater impacts.
A. Performance Standard
Adequacy of drainage facilities is based on conformance with the City of Imperial
design guidelines for storm water runoff and management. Conformance with
the City’s NPDES requirements, the requirements of the Federal Emergency
Management Agency and the requirements established by the Imperial Irrigation
District for storm water runoff are also applicable.
B. Facility Planning and Adequacy Analysis
The City of Imperial’s stormwater drainage facilities include many ditches, pipes and
detention basins which function to divert storm runoff and standing water away
from residences and business within the City. These facilities convey storm
water runoff into the main water drainage system managed by the Imperial
Irrigation District (IID). However, the IID has communicated interest in abandoning
all facilities within the City limits for the City to take over the system. Additionally, as
future development occurs and drainage facilities are no longer used for
agricultural drainage, the IID will abandon those facilities to the City, so that the IID
only manages drains used for agricultural.
1. Inventory of Existing Facilities
A majority of the storm water collected within the City of Imperial uses
surface drainage ditches to convey storm water to the IID drains. The
primary drainage facilities receiving the City of Imperial’s storm water,
and managed by the Imperial Irrigation District, include the North
Central Drain, North Central Drain No. 2, Newside Drain No. 1, Dahlia
Drain No. 8, Dolson Drain No. 2 and the McCall Drain No. 5A and 5B.
There are five primary drainage zones that tie into these drains as
depicted in Exhibit 6-Drainage Zones and Retention Facilities.
52 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DRAINAGE & STORMWATER
Exhibit 6-Drainage Zones and Retention Facilities
53 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DRAINAGE & STORMWATER
The five primary drainage zones within the City can be geographically
described as southwestern portion (SW), central west portion (CW), central
east portion (CE), eastern portion (E), and northeast portion (NE). The zones
are described in more detail below.
SW Drainage Zone: The southwestern portion of the City near the
Sandalwood and Wildflower subdivisions and the industrial area at Aten and
La Brucherie use a series of retention basins to restrict the flow of storm
water before entering the underground storm water conveyance pipes.
There is a small lift station adjacent to Aten Road, which assists with the
conveyance of storm water for the Sandalwood and Wildflower
subdivisions into the storm water conveyance system. The system then
transports the storm water to the North Central Drain No. 2 which ultimately
flows to the main North Central Drain.
CW Drainage Zone: The central portion of the City, north of the airport and
west of Highway 86, conveys storm water through surface drainage
ditches to a primary surface drainage ditch located adjacent to Highway
86. This drainage ditch flows north adjacent to Highway 86 to the IID Dahlia
No. 8 drain.
CE Drainage Zone: The central area east of Highway 86 and west of
the railroad tracks also uses surface drainage ditches to convey storm
water to a primary drainage ditch adjacent to M Street. The M Street
drainage ditch flows north to Fifteenth Street. At Fifteenth Street, the M
Street ditch storm water enters the IID Dolson No. 2 Drain.
E Drainage Zone: From First Street to Barioni Boulevard east of the
railroad tracks, surface drainage ditches convey storm water to an IID
drainage pipe at the southeast corner of the intersection of Barioni and P
Street. North of Barioni Boulevard, surface drainage ditches convey
stormwater west to the primary drainage ditch at Barioni Boulevard and N
Street. The N Street drainage ditch flows north to Fifteenth Street. At this
point the surface water flows into an 18" pipe which conveys the
stormwater west under the railroad tracks and into the IID Dolson No. 2 Drain.
NE Drainage Zone: There are two subdivisions in the northern portion of
the City east of Highway 86. Each subdivision contains their respective
retention basins and underground stormwater conveyance systems. Water
flows out of the retention basins and into the IID Dolson No. 8 and No. 2
Drains.
54 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DRAINAGE & STORMWATER
2. Adequacy of Existing Facilities
The existing primary drainage system managed by IID is not designed to
convey all storm water runoff from urbanization. Therefore, recent and
new development must provide for on-site retention of storm water to
mitigate against storm water impacts. These retention facilities are
designed to control storm water flows into the IID drains. Conveyance
out of the retention basins is restricted by the use of 12" pipes.
The City of Imperial Public Works Department provides the maintenance
of the City storm water drainage system. The public works crews
monitor the flow within the drainage ditches, make minor repairs and
clean the ditches on an as needed basis. Additionally, street sweeping
occurs throughout the City, which is a preventative method that assists
in keeping the drainage ways clean of some debris and sediment.
According to the City of Imperial Public Works Director, Jackie Loper, the
current system provides adequate conveyance of storm water for
events up to a100-year storm. There were only two instances in the
mid - 1970's when the drainage system did not adequately convey storm
water in localized low-lying areas.
3. Future Demand for Facilities
As future development occurs, storm water drainage systems must
be installed into the project area to ensure adequate collection and
conveyance of runoff. The type and extent of the development
proposed will affect the demand of facilities. A significant increase in the
amount of impervious surfaces will result in a greater amount of
surface runoff. The exact size and location of future facilities will be
determined at the time development is proposed and processed
through the City of Imperial. All future development must continue to
comply with IID policies regarding temporary retention of storm water to
reduce the impacts to the IID drains.
Storm water runoff as well as other contributing factors has
degraded both the New and Alamo Rivers. The recently updated
Water Quality Control Plan for the Colorado River Basin Region
prepared by the California Regional Water Quality Control Board
contains strict requirements for the water quality conveyed into these
rivers. Future facilities must be designed to adhere to the latest pollution
control devices and NPDES requirements.
4. Opportunities for Shared Facilities
The City of Imperial maintains all storm drain facilities within the
incorporated City limits using full-time and part-time staff. Assistance
55 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DRAINAGE & STORMWATER
from other jurisdictions for drainage services is not provided or necessary
beyond the maintenance provided by IID for IID Drains. The City of
Imperial and IID maintain different aspects of the total drainage system.
As previously noted, the primary drainage system is managed by IID
but it is not intended to convey storm water generated by urban runoff.
However, some urban storm water does flow into the IID drainage
system. At this time, the management of these facilities is effective and
is not expected to change in the near future.
5. Phasing
The construction of future storm water drainage facilities is based on the
rate of new development within the City of Imperial. Additional storm
water drainage facilities will be needed in the proposed annexation
areas in order to convey storm water into the IID drainage system. The
future storm water management systems for the annexation areas will
be designed during the Tentative Map and Final Map stage of
development.
C. Mitigation
The City of Imperial should continually monitor the existing storm drain facilities to
ensure the facilities are operating at an adequate level. Specifically, the City should
implement the following mitigation measures for drainage facilities:
D-1 All future development in the City of Imperial shall be
required to construct storm drain facilities in accordance
with the design standards of the Engineering Department
and the IID necessary to convey storm water into existing
drains managed by IID.
D-2 All future development shall retain storm water on-site or
within existing retention basins to restrict storm water flow
for a minimum period of 72 hours before discharging into
IID facilities.
D-3 All future development shall ensure compliance with all
local, state and federal rules and regulations related to the
discharge of storm water.
D-4 All development shall provide improvements constructed
pursuant to best management practices as referenced in
the California Storm Water Best Management Practices
Handbook.
56 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DRAINAGE & STORMWATER
D. Financing
Future storm water drainage facilities will be installed at the developer’s expense at
the time of project construction. Maintenance of existing and future public
drainage facilities will be financed by the City of Imperial General Fund.
1. Funding Sources and Per Capita Costs
The current revenue sources for storm water drainage facilities include
property and sales taxes, licenses and permits, charges for services
and other miscellaneous sources. The City of Imperial’s annual budget
does not segregate out the maintenance and operation costs for
storm drain facilities. Thus, the maintenance and operation costs of
the storm water drainage system could not be accurately determined.
However, based on information provided by the City Public Works
Department, it is estimated that approximately $34,505 per year is
spent on maintenance and operation costs. The amount fluctuates
depending on the amount of rain that is received on any given year.
Since the City of Imperial’s annual budget does not segregate out
the maintenance and operation cost for storm drain facilities, the
average per capita cost for the continued maintenance and operation
of the storm water drainage system was determined by the City’s
current population and estimated $34,505 per year amount for
maintenance and operation. The per capita cost for drainage facilities is
assumed to be $1.99.
$34,505 / 17,313 population = $1.99 per capita
A cost estimate for future continued maintenance and operation of
the storm water drainage facilities is provided in Table D-1-Drainage
Facilities Costs. These estimations assume a constant cost per
capita in the year 2014 - 2015 dollars and the provided population
projections.
57 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DRAINAGE & STORMWATER
Table D-1-Projected Drainage Facilities Costs
Year Projected/Planned Drainage Facility Costs
Population
2020 29,476 $58,657.24
2025 48,692 $96,897.08
2030 53,533 $106,530.67
2035 62,541 $124,456.59
2. Future Funding Sources
The City of Imperial will continue to use the existing funding sources for
the maintenance and operation of City storm water drainage facilities
which include property and sales taxes, licenses and permits, charges
for services and other miscellaneous sources. However, due to the
future growth anticipated, other funding sources for capital improvements
will be needed.
The City collects development impact fees; however, there is currently no
impact fee for drainage facilities. Other funding sources that could be
made available are a City wide community facilities district, special
assessment districts or a community services district. Further
descriptions of these and other financing mechanisms are provided in
the Financing section of this Service Area Plan.
58 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FIRE PROTECTION
III. FIRE PROTECTION
Fire protection services are provided to the City of Imperial by the Imperial County Fire
Department (ICFD). The City of Imperial contracts with the County of Imperial for fire
protection and emergency services in accordance with the Agreement for Fire Protection
Services Between County of Imperial and City of Imperial (July June 18, 2014). The
current agreement is effective until June 30, 2017 (See Appendix B). The ICFD maintains
and operates five (5) fire stations throughout the County of Imperial. Imperial is serviced by
Imperial County Station #1-4. The County Station #1-4, servicing the City of Imperial, is
located at the Imperial County Airport grounds.
A. Performance Standard
The Imperial County Fire Department informally monitors the demand on fire
protection facilities and services. The fire department has consistently provided
response times of 3 to 5 minutes for medical emergencies and 4 to 7 minutes for
structural fires. Therefore, the performance standard necessary to maintain the
current level of service shall not exceed a response time of 5 minutes for medical
emergencies and 7 minutes for structural fires. Additionally, the Agreement for
Fire Protection Services states that fire protection service will be provided to the
City of Imperial on a twenty-four (24) hour, seven (7) day a-week basis.
Additionally, the NFPA Standard for Firefighters is set at one firefighter per
1,000 residents.
B. Facility Planning and Adequacy Analysis
The areas currently served by the ICFD include both the areas within the City
limits and the annexation areas. The County fire department will continue to
provide service to these areas.
1. Inventory of Existing Facilities
The City of Imperial is served by the one fire station located at 2514 La
Brucherie Road. The fire station has 14,500 square feet of building area.
There are currently 3 firefighters (one of which must be a paramedic) on
duty each shift. In addition, there is one (1) reserve firefighter on call at night. In
accordance with the Agreement for Fire Protection Services, three (3) full-time
Captains, three (3) full-time Fire Fighters II, and three (3) reserve firefighters
are assigned to the City 24 hours per day. The same agreement further commits
the following fire protection equipment and facilities for availability to Imperial:
One (1) 500 gallon Engine (City Owned)
One (1) 500 gallon Engine/105 ladder truck (City Owned)
59 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FIRE PROTECTION
One (1) 1,000 gallon Engine (County)
One (1) 1,800 gallon Water Tender (County)
One (1) 2,500 gallon Water Tender (County)
One (1) 1,500 gallon Aircraft Crash/Rescue Truck (County)
One (1) Medium Rescue Squad (County)
One (1) Hazardous Device (Bomb) Unit (County)
As shown on EXHIBIT B of the Agreement for Fire Protection Services, the City
of Imperial also owns some of the equipment at the fire station. Minor
preventative maintenance of the equipment and management of the personnel
are performed by the County. Major repairs to equipment are the responsibility
of the City of Imperial.
2. Adequacy of Existing Facilities
The fire department currently provides average response times of 7 minutes for
the Northeast area (Neckel Road), 3 minutes for the Southwest area
(Aten/Austin), 5 minutes for the Northwest area (14th/D Street), and 5 minutes
for the Southeast area (Clark/Aten). However, as development continues to
occur, there may be occasional delays due to traffic. A shared facility for police
protection and fire protection is planned at the northeast corner of Clark Road
and Worthington Road to further minimize response times east of the railroad
tracks. An alternative site has also been designated on Aten Road between P
Street and Dogwood Road. Please refer to Exhibit 7- Existing and Proposed
Fire Station Facilities for a depiction of the regional location of the existing fire
station and proposed location of future facilities.
3. Future Demand for Facilities
The City is estimated to reach a population of 62,541 by the year 2035.
Based on the demand projections provided in this service area plan, it is
apparent that another fire station is needed. A master plan for fire protection
facilities has not been prepared by the fire department and future needs for
additional firefighting equipment and another fire station have yet to be fully
determined. However, there are preliminary indications that a shared fire/police
substation is desired. This public safety facility is anticipated to be
approximately 15,000 square feet and to include training facilities to be shared
by the fire and police departments. It is assumed that the fire department will
utilize approximately 10,000 square feet of the facility. Based on the current
development trend toward the east, the new public safety facility may be
located at the northeast corner of Clark Road and Worthington Road as denoted
in Exhibit 7.
60 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FIRE PROTECTION
Exhibit 7- Existing and Proposed Fire Station Facilities
61 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FIRE PROTECTION
4. Opportunities for Shared Facilities
The County of Imperial, through the office of the County Fire Chief, provides to
the City of Imperial fire protection and emergency medical services. The fire
station located in the City of Imperial is owned by the county as well as most
of the firefighting equipment. However, the City owns a 1,250 gallon pumper
and various firefighting equipment. All facilities are used jointly in order to
provide an adequate level of service for both the county and City area.
There is also the Imperial Valley Fire Service and Rescue Mutual Aid Plan in
place to ensure that emergency needs will be met. The intent of the
mutual aid plan is to meet the anticipated needs of local agencies within their
zones, to access resources of adjacent agencies within the area of the
County, and to access the resources of other jurisdictions within Region VI or
beyond, if necessary, to meet the needs of emergency incidents.
5. Phasing
As the City’s population increases, additional fire department staff can be hired
when necessary in order to meet the demand created by future
development. The following Table F-1 Projected Fire Service Demand
represents the demand for fire protection services for the next 20 years in 5
year increments.
Table F-1 Projected Fire Service Demand
Year Projected/Planned Fire Service Demand1
Population
19,500 SF Facility
2020 29,476
29 Firefighters/3 Paramedics
19,500 SF Facility
2025 48,692
48 Firefighters/3 Paramedics
19,500 SF Facility
2030 53,533
53 Firefighters/3 Paramedics
19,500 SF Facility
2035 62,541
62 Firefighters/3 Paramedics
1Square footage demands based on need to meet required response times, as
derived from City of Imperial 2007 Service Area Plan.
C. Mitigation
The City of Imperial and the County fire department should continually monitor the
existing fire department facilities and response times to ensure that adequate fire
protection is provided. In accordance with the agreement for fire protection
services, the county provides the City with monthly reports concerning all incidents
occurring during the month and the maintenance/condition of all City owned
equipment. Additionally, the County Fire Chief and the Imperial City Manager
62 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FIRE PROTECTION
are required to meet on a quarterly basis to discuss fire related issues. Mitigation
recommended is as follows:
F-1 Fire protection facilities and personnel should be
incrementally added as demand increases.
F-2 An additional fire station should be proactively planned for.
F-3 All major developments proposed within the City of Imperial
shall be forwarded to the fire department for review and
comments.
F-4 Adequate fire flows shall be provided for all development
projects.
F-5 A Master Plan for Fire Protection Facilities to address
development east of the railroad tracks should be prepared
prior to the expiration of the current fire protection services
contract (June 30, 2017).
D. Financing
The City of Imperial contracts with Imperial County for fire protection and
emergency medical services. The City of Imperial currently has no plans to
change the fire protection services as provided by the Imperial County Fire
Department. A yearly fee amount is paid to the County for these services.
According to the Agreement for Fire Protection Services Between County of
Imperial and City of Imperial, the fiscal year 2014-2015 fee was estimated at
$896,699. The current revenue sources for fire protection services include
property and sales taxes from the City’s general fund. A new agreement will be
needed by June 30, 2017.
1. Per Capita Costs
For the fiscal year 2014-2015, the City of Imperial has budgeted $894,000 for
fire protection services. Using the City’s estimated 2015 population of 17,313,
fire protection service per capita cost for the 2014-2015 fiscal year is $51.63
per resident. This data was calculated by dividing the annual budget of the fire
department by the existing population.
$894,000 / 17,313 residents = $51.63 per capita
The Agreement for Fire Protection Services identifies estimated costs of
$869,699 for the 2014-2015 fiscal year through the 2015-2016 fiscal year. A
cost estimate for future fire protection services is provided in the table below
using the budgeted amount and per capita cost of $51.63 per resident.
63 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FIRE PROTECTION
Table F-2 Projected Fire Service Costs
Year Projected/Planned Fire Service Cost
Population
2020 29,476 $1,521,845.88
2025 48,692 $2,513,967.96
2030 53,533 $2,763,908.79
2035 62,541 $3,228,991.83
2. Future Funding Sources
The City of Imperial will continue to use the existing funding sources of
property and sales tax, including development impact fees, and continue the
contracting of fire protection services through the Imperial County Fire
Department. Other funding sources that may be available in the future include
a Fire Suppression Assessment, formation of a Citywide Community Facilities
District, or grant funding. Further descriptions of these and other financing
mechanisms are provided in the Financing section.
64 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN POLICE PROTECTION
IV. POLICE PROTECTION
Police services are provided to the Imperial community by the Imperial Police
Department. The police station is located at 424 S. Imperial Avenue in Imperial which is
the main headquarters. The Imperial Police Department provides services to the entire
City of Imperial. The City of Imperial Police Department also assists the County Sheriff’s
Office if the County does not have an officer in the vicinity. The Imperial Police
Department will also provide backup for the County Sheriff if necessary. Services in the
City of Imperial include patrol, criminal investigations, civil services, and crime
prevention.
A. Performance Standard
The performance standard for police protection and law enforcement facilities was
determined upon approval of the 2001 service area plan. The performance standard
is 1.6 officers per 1,000 population, 2 officers per 1 patrol vehicle, 0.25 Non-paid
volunteers per 1,000 population, and 237 square feet of building area per full-time
personnel.
B. Facility Planning and Adequacy Analysis
The Imperial Police Station is a 3,788 SF Facility and houses the Police staff and
support staff including a Records Clerk and a Clerk Typist and a ½ time office
assistant. Patrol officers are out on the field during their shifts. The City of Imperial
Police Department has a minimum of two police officers on duty per shift. Each
shift is 12 hours in length. Dispatching services are contracted through the City of
El Centro Police Department.
1. Inventory of Existing Facilities
Existing facilities include police department personnel. The City of Imperial is
served by seventeen (17) sworn officers: one (1) Police Chief, one (1) Captain,
three (3) Sergeants, one (1) Corporal, one (1) Detective, eight (8) Patrol Officers
and officer assignments for one (1) Motor Officer, one (1) Canine Officer, one (1)
School Resource Officer. There is an additional Officer assigned to Street
Interdiction Team. Two reserves and one volunteer are also a part of the
department but not counted as a part of total personnel. According to an
inventory provided by the Imperial Police Department, the department has the
following existing policing and law enforcement personnel and facilities:
Facilities
3,788 square feet of building
Ten (10) Patrol Vehicles
Six (6) Support Vehicles
One (1) Motorcycle
65 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN POLICE PROTECTION
2. Adequacy of Existing Facilities
The existing police department facilities do not adequately serve the
community. The current facility lacks a community room, an emergency
operating center, restrooms for public usage, interview rooms, female locker
room and restroom facility, adequate evidence rooms with proper ventilation,
and adequate space for report writing. Additionally, there are only two holding
cells. Sergeants currently share one office with no room for growth, and there
is no secured parking for the Police Units and Officers’ private vehicles.
Based on the performance standards, the existing demand for law
enforcement facilities is as follows:
Staff Level
Existing Population x Performance Standard = Current Officer Demand
17,313 Population x 1.6 Officers / 1,000 population = 27 Sworn Officers.
Existing Population x Performance Standard = Current Volunteer Demand
17,313 Population x 0.25 Volunteers / 1,000 population = 4 Volunteers
Facility
Full-Time Personnel x Performance Standard = Current Demand
27 full-time personnel x 237 Sq. Ft. of Building Area = 6,399 Sq. Ft.
The Police Department currently has a staffing level of 17 officers and one
volunteers thus a deficiency of -10 police officers and -3 volunteers. Based
on the current demand for 6,399 square feet of building space, there is a
current deficiency of -2,611 square feet given that the current offices are
limited to 3,788 SF.
3. Future Demand for Facilities
The City is estimated to have a population of 62,541 people by the year
2035, using planned development figures. Using the established performance
standard, the City will need 100 sworn officers 50 patrol vehicles to meet
future demand by the year 2035. Therefore, the City will need to employ 83
more sworn officers and obtain 40 more patrol vehicles by the year 2035. In
order for the Police Department to meet the performance standard in the
future, there will also be a need for a total of 15 non-paid reserve
officers/volunteers and 23,700 square feet of building space by the year 2035.
The City has set aside a 10-acre property on the northeast corner of Worthington
Road and P Street for Public Facility usage as depicted in Exhibit 8-Existing
and Proposed Police Protection Facilities. The future demand for law
enforcement facilities is provided on the Demand for Police Protection
Services.
66 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN POLICE PROTECTION
Exhibit 8-Existing and Proposed Police Protection Facilities
67 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN POLICE PROTECTION
It is assumed that the fire department will utilize approximately 10,000 square
feet of the facility which leave 5,000 square feet for the Police Department.
The public safety building is currently in the conceptual phase, so the size,
number of people needed to adequately serve the station, and the cost is
unknown at the time of preparation of this Service Area Plan update. Based
the analysis conducted by this Service Area Plan, it does not appear that a joint
use public safety facility at 15,000 square feet will be adequate for demand
beyond 2020. The planned public safety facility would include training facilities
to be shared by the fire and police departments.
4. Opportunities for Shared Facilities
Although the City of Imperial maintains its own Police Department, it fully
utilizes facility sharing opportunities. Dispatching services are currently provided
through the 911 dispatching facility located in the City of El Centro. However,
a regional dispatching facility that would be located within the City of Imperial
is being considered. Additionally, the Imperial Police Department and the
County Sheriff provide emergency law enforcement back-up for each other on an
as needed basis. It is further anticipated that the Police Department will share a
new facility with the Imperial County Fire Department on the aforementioned
10 acre property at the northeast corner of Worthington Road and P Street.
5. Phasing
As the City’s population increases, adequate Police Department staff and patrol
vehicles can be added, as necessary, in order to meet the current level of
service standards. The following Table P-1 represents the demand for police
department staff, vehicles and square footage for the next 20 years in 5 year
increments. A more detailed service demand is noted on Table P-1 which
includes reserves and other personnel.
Table P-1 - Projected Police Service Demand
Year Projected/Planned Police Service Demand
Population
11,139 SF Facility
2020 29,476
47 Police Officers/24 Vehicles/7 Volunteers
18,249 SF Facility
2025 48,692
77 Police Officers/39 Vehicles/12 Volunteers
20,145 SF Facility
2030 53,533
85 Police Officers/43 Vehicles/13 Volunteers
23,700 SF Facility
2035 62,541
100 Police Officers/50 Vehicles/15 Volunteers
68 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN POLICE PROTECTION
C. Mitigation
Temporary buildings, vehicles and personnel can be added incrementally as
demand for police protection service demand increases with population growth and
until the permanent capital investments can be made. The following is a list of
mitigation recommendations for Police Protection:
P-1 The City of Imperial shall continue to monitor the response
times for priority 911 calls to ensure adequate public safety.
P-2 Prior to the year 2017, a financing mechanism shall be
identified that will enable the City to construct a new police
station with possible dispatching services.
P-3 The Police Department shall continue obtaining grants and
other funds to combat crime through proactive preventative
measures.
P-4 The City of Imperial and the Imperial Police Department
should consider the preparation of a Law Enforcement
Facilities Master Plan that conducts an in depth analysis of
the facility needs to meet the goals and objectives of the
Police Department through build out of the City of Imperial
by 2020.
D. Financing
The current revenue sources for police protection services include property and
sales taxes from the City’s general fund. The 2014-2015 budget allocated
approximately $2,380,204 for police protection services from the City’s general
fund. Other revenue is derived from special revenue sources including the State
C.O.P.S. Grant (1584 COPS Grant), asset forfeitures, and Development Impact
Fees.
1. Current and Per Capita Costs
The 2014-2015 City of Imperial budget provided approximately $2,380,204
for police protection services from the City’s General Fund. Using the
City’s current population of 17,313, police protection service costs $137.48
per resident. This cost was determined by dividing the funds appropriated
from the general fund for police protection services by the existing
population. A cost estimate for future police services is provided in Table P-2
below.
$2,380,204 / 17,313 population = $137.48 per capita
69 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN POLICE PROTECTION
Table P-2 Projected Police Service Costs
Year Projected/Planned Police Service Cost
Population
2020 29,476 $4,052,360.48
2025 48,692 $6,694,176.16
2030 53,533 $7,359,716.84
2035 62,541 $8,598,136.68
2. Future Funding Sources
The City of Imperial will continue to use the existing funding sources and
continue to contract with the City of El Centro for dispatching services.
However, due to the future growth anticipated, other funding sources for a
new police station with possible dispatching facilities and additional
vehicles and equipment will be needed. Further descriptions of these and
other financing mechanisms are provided in the Financing section.
70 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LIBRARY
V. LIBRARY
The Imperial Public Library is owned and operated by the City of Imperial and it is
located at 200 West 9th Street. The single library serves the entire population of
Imperial. Services provided by the library include circulation of library materials to all
patrons, reference service, audio visual services, computer use and other services.
A. Performance Standard
The performance standard for library facilities was determined during the
preparation of the Service Area Plan approved by LAFCO on January 25, 2001. It
was based on the existing library facilities square footage and the existing
population at the time of the preparation of the Service Area Plan. Therefore, the
performance standard for library facilities for the City of Imperial is 217 square feet
of library facilities per 1,000 residents.
B. Facility Planning and Adequacy Analysis
This analysis provides an inventory of the existing library facility owned by the City
of Imperial, the existing and future demand for facilities, as well as a projected
phasing schedule. The purpose of this analysis is to determine if the existing
facilities are adequate and to identify approximately when additional facilities will
be needed in order to meet future demand.
1. Inventory of Existing Facilities
As noted above, the City of Imperial operates and maintains its own public
library. The library staff consists of two full-time personnel and four part-time
employees. The library was in the process of hiring another part-time employee
at the time this Service Area Plan was being prepared. The Imperial Public
Library located at 200 West Ninth Street currently shares 7,260 square feet of
space with the Council Chambers/Community Center, with an estimated 4,920
square feet strictly for library use (2,340 square feet is used for Council
Chambers/Community Center). The library houses the following:
Collection
31,692 books
391 serial volumes
536 audio materials
720 video items
1 database-1500+ eBooks an Audio eBooks
26 current serial subscriptions
Computers and Equipment
1 copier for staff/public use
11 public use computers/1 library catalog computer
71 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LIBRARY
12 laptops and 1 storage/charging cart (for literacy programs)
3 library staff computers
2 black/white laser printers
1 fax machine for staff/public use
Video surveillance equipment (3 cameras, monitor/VCR)
Miscellaneous (shelving, paper back spinners, tables and chairs)
2. Adequacy of Existing Facilities
Using the performance formula provided above of 217 SF per 1,000 residents,
the existing demand for library facilities is 3,757 square feet. Based on the
performance standard formula, there is a surplus of 1,163 square feet of
library building square footage.
Existing Population x Performance Standard = Current Facility Demand
17,313 Population x 217 Sq.Ft. / 1,000 population = 3,757 Sq. Ft.
The current space reserved for library use at the facility, of 4,920 SF of library
space, is currently adequate and is currently undergoing another expansion. The
current improvements at the library are estimated at $610,000 that will result in
an additional 4,738 SF of total space, of which 2,754 will be reserved for library
use. The ending library space by the end of 2015 will be 7,674 SF. As the
population increases, there will be a need for additional library facilities, beyond
the 7,674, by the year 2035.
3. Future Demand for Facilities
As the City of Imperial continues to grow, so does the need for library
facilities. With a planned population expected to reach 62,541 by the year
2035, additional library facilities will be needed to serve the future residents. In
order to meet this future demand, an additional 5,897 square feet of library
facilities, beyond the 2,754 SF library space expansion, will be needed by 2035.
4. Opportunities for Shared Facilities
The City of Imperial participates in the SERRA Cooperative System that includes
libraries from Imperial County and San Diego County for inter-library loan
program, the library shares resources with other libraries in the region. The
public library will continue to pursue this opportunity for shared resources in order
to keep costs down while providing acceptable services to City residents. The
library further has a conference room that is used for closed sessions by City
Council. If needed, the library could be used for public meetings when other
City administrative facilities are occupied.
72 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LIBRARY
5. Phasing
The yearly demand for library facilities is shown on Demand for Library
Services table below. The yearly demand Table L-1 below provides the square
footage needs for the library over a twenty-year period in five-year increments.
Table L-1 Projected Library Service Demand
Year Projected/Planned Library Service Demand
Population
2020 29,476 6,396 SF Facility
2025 48,692 10,566 SF Facility
2030 53,533 11,616 SF Facility
2035 62,541 13,571 SF Facility
C. Mitigation
The City shall support the continuation of library services as a necessary and
desirable community service facility. The following mitigation is recommended:
L-1 The City of Imperial shall continue efforts to obtain
additional funding in order to continue providing adequate
library services to the residents.
D. Financing
The current revenue sources for library facilities and services include property and
sales taxes from the City’s general fund and impact fees. The 2014-2015 budget
allocated approximately $210,751 for library services from the City’s general fund.
1. Per Capita Costs
The 2014-2015 City of Imperial budget identifies approximately $210,751 for
continued operation of library services. Using the City’s current population of
17,313 library services cost $12.17 per resident. This cost was determined by
dividing the funds appropriated form the general fund for library services by
the existing population. A cost estimate for future library services is provided in
the Table L-2 below. Note that the table uses 2015 dollars, and based on the
following:
$210,751 / 17,313 population = $12.17 per capita
73 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN LIBRARY
Table L-2 - Projected Library Service Costs
Year Projected/Planned Library Service Cost
Population
2020 29,476 $358,722.92
2025 48,692 $592,581.64
2030 53,533 $651,496.61
2035 62,541 $761,123.97
2. Future Funding Sources
The City of Imperial will continue to use the existing funding sources for the
continued maintenance and operation of the Imperial Public Library. Due to
future growth anticipated, other funding sources should be considered to
maintain an adequate level of library service for the existing and future residents.
There are several funding sources for library facilities such as community
facilities district, special assessment district, the California Literacy Campaign
Fund, as well as Community Development Block Grants and user fees.
Further descriptions of these and other financing mechanisms are presented in
the Financing Plan of this Service Area Plan.
74 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN RECREATIONAL AND PARK FACILITIES
VI. RECREATIONAL AND PARK FACILITIES
There are a number of recreational facilities within the City of Imperial including open space
areas used for recreation. Open space and recreational uses include fourteen city parks.
City parks offer picnic facilities and recreational opportunities, including baseball and
softball diamonds, basketball courts and tot-lots. Eager Park is centrally located in the City
and also has a splash pad. In addition to these amenities, the City also offers an array of
local recreation programs and services for children, adults, and seniors at City facilities.
A. Performance Standard
The City of Imperial has adopted the Performance Standard of 3.0 acres parkland/1,000
population. This standard is applied to developer impacts and further stipulated as a
Goal in the Open Space and Recreation Element of the General Plan.
B. Facility Planning And Adequacy Analysis
The existing public parks within the City of Imperial are owned and operated by the City
of Imperial Parks Department. The recreation department has six (6) full time
employees (three maintenance employees and three professional employees) and one
part time employee. Part-time employees are increased to 25 during the summer
months.
1. Inventory of Existing Facilities
The City of Imperial currently has over 50 acres of parkland as depicted in Exhibit 9-
Park Facilitie7 s. Park inventory included over 50 acres as follows:
Table R-1
City of Imperial Park Space
Park Acres
C.A. Irving Sports Complex 2.07
Aviation Park .89
Imperial Dog Park 4.75
Eager Park 2.07
Evans Park 1.35
Freddie White Park 2.07
Joshua Tree Park 11.50
Paseo Del Sol Park 14.00
Savanna Ranch Green Belt 3.94
Savanna Ranch Park 2.94
Sky Ranch Green Belt 4.59
Sky Ranch Park 2.19
Sunset Park 5.25
Springfield Picnic Areas 1.68
Victoria Basin/Park 2.9
Victoria Park 0.68
Total 62.87
75 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN RECREATIONAL AND PARK FACILITIES
Exhibit 9- Existing Park Facilities
76 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN RECREATIONAL AND PARK FACILITIES
-
2. Adequacy of Existing Facilities
Using the goal of 3.0 acres per 1,000 population, there should be a
minimum of 51.94 acres of parkland. Based on the existing park acreage of
52.25 acres, there is an existing surplus of 10.62 acres. The adequacy is
calculated as follows:
Existing Population x Performance Standard = Current Demand
17, 313 Population x 3.0 Acres / 1,000 population = 51.94 Acres
Existing Facilities – Current Demand = Adequacy
62.87 Acres – 51.94 Acres = 10.93 Acres Surplus
The city currently has a surplus of park acreage. It is important that
adequate park facilities be provided to serve the residents of Imperial. The City
actively requires the development community to provide parkland either through
the payment of the development impact fee or through parkland donations or
improvements as a part of the development approval process.
3. Future Demand for Facilities
Based on a 2035 population projection of 62,541 the City of Imperial will need
187.62 acres of recreational open space in order to be consistent with the
performance standard objective of the General Plan. This indicates that the
City will need to obtain an additional 135.37 acres of recreational open space
by the year 2035. This figure was determined as follows:
3.0 Acres / 1,000 Population x 62,541 population = 187.62 Acres of Future
Demand
187.62 Acres of Future Demand - 62.87 Acres Existing Parkland = 124.75 Acres
Needed
The City has been planning a Regional Park and Equestrian Center to be located
along the northern part of the City Limits in an area bound by Larsen Road to the
north, Ralph Road to the south and Nance and La Brucherie Roads at the
respective west and east boundaries. The subject area encompasses 144 acres
of which some will be dedicated for recreational facilities.
4. Opportunities for Shared Facilities
The City currently contracts with the Imperial High School during the summer for
use of the pool located at the high school for public swimming. The City has
Joint Use Agreements with the Imperial Unified School District for use of other
recreational facilities outside of school hours. There are three schools within
Imperial Unified School District that could provide for recreational opportunities
77 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN RECREATIONAL AND PARK FACILITIES
during the after school hours and on weekends. A Joint Use Agreement with
the Imperial Unified School District for the new Frank Wright Middle School at
the corner of Fifteenth Street and Imperial Avenue was adopted by the City
and the School District. The Ben Hulse gym is also used for dance and drama.
Additional discussions may occur between the School District and the City
regarding additional joint use agreements for use of school facilities for
recreation purposes.
5. Phasing
Based on the 3.0 acres per 1,000 population performance standard for
parkland, the following Table R-2 represents the demand for recreational
land/parkland acreage for the next 20 years in five year increments.
Table R-2 Projected Parkland Demand
Year Projected/Planned Parkland Demand
Population
2020 29,476 88.43 Acres
2025 48,692 146.08 Acres
2030 53,533 160.60 Acres
2035 62,541 187.62 Acres
C. Mitigation
The City of Imperial should continue to pursue various means by which to
obtain and provide for adequate park facilities for the existing and future
residents of the City of Imperial. The following are mitigation recommendations to
achieve adequacy for park facilities.
R-1 Continue to require developers of new subdivisions to
dedicate parkland and/or pay the development impact fee
to ensure that future residents pay their fair share for
impacts on park facilities.
R-2 Pursue federal and state grants and aid funds to ensure
there are sufficient parks in the future.
D. Financing
The current revenue sources used to pay for park facilities include property and
sales taxes from the general fund, user fees for recreational activities and pool
use, and park impact fees collected from new residential developments. The City of
78 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN RECREATIONAL AND PARK FACILITIES
Imperial will continue to use these funding sources for the continued maintenance
and operation of parks and recreational facilities.
1. Per Capita Costs
The 2014-2015 City of Imperial budget provided approximately $617,592 for
parks and recreation. Using the City’s current population of 17,313, parks and
recreation facilities cost $35.67 per resident. This cost was determined by
dividing the funds appropriated for parks and recreation facilities by the existing
population. The Projected Recreation Cost Table R-3 provides a cost for
park operation and maintenance based on the year 2015 dollars and in 5-
Year increments.
$617,592 / 17,313 population = $35.67 capita
Table R-3 Projected Recreation Cost
Year Projected Population Recreation Cost
2020 29,476 $1,051,408.92
2025 48,692 $1,736,843.64
2030 53,533 $1,909,522.11
2035 62,541 $2,230,837.47
2. Future Funding Sources
The City of Imperial will continue to use the existing funding sources for the
continued maintenance and operation of the park and recreation facilities.
However, due to the anticipated future growth, other funding sources will be
needed in order to develop the regional park and equestrian center in order to
provide an adequate level of service for future residents. There are several
other funding sources available for park facilities such as community
facilities district, special assessment district, as well as Community
Development Block Grants and other state and federal grants. Further
descriptions of these and other financing mechanisms are provided in the
Financing Plan section.
79 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
VII. CIRCULATION & TRANSPORTATION
A. Performance Standard
The Circulation Element of the Imperial General Plan was created to sustain safe
and efficient vehicular travel throughout the City. The Circulation Element is
consistent with the Land Use Element which dictates that no land use will be
approved that will increase the traffic on planned or existing City streets above the
street’s existing design capacity at a “level of service” of “C” or above. This “level
of service” criterion is the most traditional method used to determine the current
and future needs for adequate circulation facilities with an assignment of A to F as
noted below.
Level of Service Roadway Performance Standard
Represents free flow. Individual drivers have a high degree of
LOS “A” freedom to select their travel speeds and are unaffected by other
vehicles.
Represents stable flow, but individual drivers are somewhat
LOS “B”
affected by other vehicles in determining travel speeds.
Represents stable flow, but the selection of the speeds of
LOS “C”
individual drivers is significantly affected by other drivers.
Represents a condition of high density, stable traffic flow in which
LOS “D” speed and freedom of movement are severely restricted by the
presence of other vehicles.
Represents operating conditions at or near capacity. Individual
vehicles have little free to maneuver within the traffic stream and
LOS “E”
any minor disruptions can cause a breakdown in the flow of
traffic.
Represents breakdown conditions. At this level of service,
LOS “F” speeds are low, delays are high, and there are more vehicles
entering the roadway than can be accommodated.
The City of Imperial, similar to many other jurisdictions, has started using a different
performance standard known as Complete Streets. Complete Streets is a
transportation policy and design approach that requires streets to be planned,
designed, operated, and maintained to enable safe, convenient, and comfortable
travel and access for users of all ages and abilities regardless of their mode of
transportation. Modes of transportation in the City of Imperial include pedestrians,
bicycles, cars, trucks, buses, trains and emergency vehicles.
80 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
B. Facility Planning and Adequacy Analysis
The City of Imperial contains a circulation system which is predominantly oriented
in a north/south and east/west grid system. The major north/south arterial
system consists of Austin Road, Imperial Avenue, State Highway 86, P Street
(Clark Road), and Dogwood Road. The major east/west arterial system consists
of Ralph Road, Neckel Road, Fifteenth Street, Barioni Boulevard (Worthington
Road) and Aten Road. These streets have independent classifications in
accordance with the Imperial General Plan and updated structural section
guidelines as follows:
Table C-1 City of Imperial Major Street Classifications & Guidelines
CLASSIFICATION ROW/PAVED WIDTH NO. OF LANES
Highway 300/226 Feet 4
Major Arterial 102/80 Feet 4
Secondary Arterial 84/50 Feet 2
Industrial Collector 70/44 Feet 2
Residential Collector 60/40 Feet 2
1. Inventory of Existing Facilities- The City of Imperial maintains over seventy
one (71) lineal miles of roadway (Source: ICTC, 2015). The existing facilities,
identified per the noted classifications are depicted in attached Exhibit-10 City
of Imperial Circulation System. A more detailed discussion for each of the
facilities identified is noted below:
Signalized Intersections - The City of Imperial contains six signalized
intersections which include the intersections of Aten Road/Highway 86, Barioni
Boulevard/Highway 86, Fifteenth Street/Highway 86, La Brucherie/Aten Road,
Clark Road/Aten Road and Cross Road/Aten Road. A seventh signal is planned
for the Aten and Dogwood intersection.
State Highway – Highways are main roads that typically connect major towns or
cities and are designed for high speed traffic. Highways collect a large volume of
traffic with speed limits from 55 to 70 miles per hour. The City of Imperial has
approximately 3.5 lineal miles of highway within its incorporated City Limits.
State Highway 86 - Highway 86, a major four lane
Expressway, is located within the City of Imperial but is
maintained and managed by the California State Department
of Transportation. The State Department of Transportation
also controls the State Highway right-of-way.
81 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
Major Arterials - Major arterials move traffic through a City from one point
to another. Speed limits on major arterials are typically 45 mph and are
designed with four lanes. On-street parking should be limited and residential
lots should not have direct access onto major arterials. The City of Imperial has
over eight (8) lineal miles of existing and planned major arterials within its current
incorporated City Limits.
Ralph Road-The majority of Ralph Road that lies within the
City’s Sphere of Influence is currently within unincorporated
areas of Imperial County and has a pavement width less than
the designed pavement width/capacity of a major arterial.
Neckel Road- The majority of Neckel Road that lies within the
City’s Sphere of Influence is currently within unincorporated
areas of Imperial County and has a pavement width less than
the designed pavement width/capacity of a major arterial.
Barioni Boulevard (Worthington Road)- The majority of this
major arterial, within the Sphere of Influence boundaries, is
within the incorporated City Limits as Barioni Boulevard, but
not improved as a four lane roadway. Roadway sections
within unincorporated areas of Imperial County have a
pavement width less than the designed capacity of a major
arterial.
Aten Road- All of Aten Road within the City’s Sphere of
Influence is within the Imperial City Limit boundary. The entire
roadway segment between Austin Road and Dogwood Road
are improved with four lanes and to the full pavement width.
La Brucherie Road (Between Barioni Boulevard & Larsen
Road)- Although La Brucherie Road is designated as a major
arterial, between Larsen Road at the north and Barioni
Boulevard to the south, it is not improved to designed capacity,
and is an unimproved facility north of Larsen Road.
P Street (Clark Road)- There are many segments of P Street
that are still within unincorporated areas of Imperial County. P
Street is currently not improved to its designed capacity.
Dogwood Road- The majority of Dogwood Road within the
Sphere of Influence is within unincorporated areas of Imperial
County. Dogwood is a major arterial that links to several
Imperial County communities and is further planned as a transit
corridor. The roadway segment within Imperial’s Sphere of
Influence is not improved to its designed capacity.
82 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
Exhibit-10 City of Imperial Circulation & Transportation System
83 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
Secondary Arterials - Secondary arterials move traffic in a similar
manner as major arterials, except they are designed with two lanes
instead of four lanes. These arterials carry a lower volume of traffic and
typically have a 35 mph speed limit. On-street parking should be limited
and residential lots should not have direct access onto secondary
arterials. The City of Imperial has just over seven (7) lineal miles of
existing and planned secondary arterials within the current City Limits.
Secondary Arterials Improved at Designed Capacity:
• Imperial Avenue
• Fifteenth Street
Secondary Arterials Not Improved to Designed Capacity:
• Cross Road
• Second Street
• Treshill Road
• P Street
• Huston Road
• Brewer Road
Industrial Collectors - Industrial collectors have a wider curb to curb width in
order to facilitate large truck movements. These collectors are designed for
low volumes with speed limits 30 to 35 miles per hour. The City of Imperial has
over just over three (3) lineal miles of existing and planned industrial collectors
within the current incorporated City Limits.
Industrial Collectors Improved at Designed Capacity:
• La Brucherie Road (Aten Road to Airport)
Industrial Collectors Not Improved to Designed Capacity:
• First Street (east)
• Fourth Street (N Street to P Street)
• M Street
• N Street
Residential Collectors - Local collectors collect a smaller volume of traffic from
a smaller area. Streets are usually two lanes wide with a speed limit of 25 to 30
miles per hour. Access is not restricted and on street parking is available. The
City of Imperial has over fifty (50) lineal miles of existing and planned residential
collectors within the incorporated City Limits.
Residential Collectors
La Brucherie Road (South City Limits to Aten Road)
First Street (west)
Third Street
Fourth Street (B Street to M Street)
Remaining number and letter streets not previously
mentioned.
84 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
Signalized Intersections-The City of Imperial contains five signalized
intersections which include the intersections of Aten Road/Highway 86, Barioni
Boulevard/Highway 86, 15th Street/Highway 86, La Brucherie/Aten Road, and
Clark Road/Aten Road. A sixth signal light is currently under construction for the
Aten Road/Dogwood road intersection.
Transit Services and Facilities-There are five IV Transit bus routes serving the
City of Imperial. Barioni Boulevard, SR-86 and Aten Road are recommended as
transit priority routes. There a total of three bus stops equipped with bus shelter
facilities within the City Limits as noted below. A fourth bus stop is at Imperial
Valley College within a future planned Sphere of Influence.
Imperial Avenue just North of Barioni Boulevard along East
East Barioni Boulevard just East of North K Street
West Aten Road just East of La Brucherie Road
2. Adequacy of Existing Facilities
Although all the existing streets are not constructed to full build-out and some are
not constructed to designed capacity, as noted in existing conditions, they are
operating at adequate volume to capacity ratios of 0.80 or better. There have
been a number of traffic studies tied to planned development that conclude
existing conditions are satisfactory and that it is only when new development is in
place modifications and improvements would be needed.
The existing circulation system is adequate to accommodate the current needs of
the City. Existing roadways properly link existing land uses. In the proceeding
section, this Service Area Plan discusses proposed improvements to
accommodate anticipated development within the City Limits and in
unincorporated areas planned for annexation.
3. Future Demand of Facilities
As the City of Imperial continues to grow, future improvements will be required
to build streets to full improvements in accordance with the design
standards set forth by the City of Imperial Engineering Department and with a
Complete Street focus. Future roadway improvements should be designed to
provide a circulation network that prioritizes and provides safe and convenient,
and attractive facilities for all users of the system. Roadway segments in
incorporated areas that are planned for major improvements within the Service
Area planning period are noted in Table C-2 for connectivity.
85 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
Table C-2 Future Roadway Improvements in City Limits
Street Name Street Street Improvement Length
Type Segment
Major Cross Road to
Aten Arterial Dogwood Road Full Street 5,250 LF
Major Barioni Blvd to
La Brucherie Half Street 9,900 LF
Arterial Larsen Road
Major P Street to
Worthington Half Street 4,500 LF
Arterial 4,500 LF East
Major Aten Road to
Dogwood Half Street 2,690 LF
Arterial Treshill Road
Major Highway 86 to
Ralph Full Street 4,930 LF
Arterial Nance Road
Major Aten Road to
Clark Street Half Street 2,690 LF
Arterial Treshill
Secondary 1st Street to
P Street Arterial 12th Street Half Street 4,200 LF
Secondary Highway 86 to
Neckel Arterial Rodeo Drive Full Street 300 LF
Secondary Rodeo Drive to
Neckel Half Street 1,400 LF
Arterial 1,400 LF East
Residential La Brucherie to
15th Street Collector E Street Half Street 1,220 LF
Residential Nance Road to
Brewer Collector La Brucherie Half Street 2,460 LF
Residential Wall Road to
Shiloh Collector Aten Road Full Street 2,020 LF
Residential Joshua Tree to
La Brucherie Collector Treshill Full Street 2,820 LF
Source: City of Imperial Planning Department
Developers will construct required internal street improvements associated with
each project Additionally, developers will be required to construct frontage
improvements along all Circulation Element roadways adjacent to each
proposed annexation and future project. Bikeways may be necessary along
Major Arterials such as Aten Road. Another City focus is to provide for
separated multi-use paths for bikeways, pedestrian walkways, or equestrian
facilities along major collector roadways which prioritize vehicular use. Some key
locations considered for separated facilities include:
1) Along Austin Road (to include equestrian pathway/connection)
2) Along Highway 86 (for pedestrian safety to serve higher density areas)
3) Along Aten Road (to connect bicyclists with Imperial Valley College)
The City’s current facility demand continues to be highly automobile-oriented.
Table C-3 in the proceeding page identifies roadway demand from planned
annexation areas.
86 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
Table C-3 Future Roadway Improvements in Annexation Areas
Annexation Area Street Street Type Width Length
N-1 Larsen Road Residential Collector Half Street 4,930 LF
Barioni Lakes North Nance Road Residential Collector Full Street 2,570 LF
N-2 Larsen Road Residential Collector Full Street 2,590 LF
Barioni Lakes West La Brucherie Major Arterial Half Street 1,350 LF
Neckel Road Secondary Arterial Half Street 5,110 LF
Nance Road Residential Collector Half Street 2,740 LF
Austin Road Major Arterial Half Street 5,260 LF
N-3 Larsen Road Residential Collector Half Street 2,560 LF
Regional Park La Brucherie Major Arterial Half Street 2,490 LF
Ralph Road Major Arterial Full Street 2,490 LF
Nance Road Residential Collector Half Street 2,740 LF
N-4 Larsen Road Residential Collector Half Street 2,370 LF
Barioni Phase I Ralph Road Major Arterial Full Street 2,370 LF
La Brucherie Major Arterial Half Street 2,680 LF
N-5 Larsen Road Industrial Collector Half Street 2,640 LF
HBC Clark Road Major Arterial Half Street 2,640 LF
Ralph Road Major Arterial Half Street 2,640 LF
NE-1 Neckel Road Secondary Arterial Full Street 5,320 LF
McFarland Ranch Dogwood Road Major Arterial Full Street 2,640 LF
NE-2 Neckel Road Secondary Arterial Full Street 2,610 LF
Sanchez Ranch Dogwood Road Major Arterial Full Street 2,640 LF
Worthington Road Major Arterial Half Street 7,930 LF
Clark Road Major Arterial Half Street 1,260 LF
Clark Road Secondary Arterial Half Street 2,600 LF
W-1 La Brucherie Major Arterial Half Street 5,780 LF
Western Neckel Road Secondary Arterial Half Street 6,900 LF
Development 15th Street Residential Collector Half Street 790 LF
SE-1 Worthington Major Arterial Half Street 7,640 LF
Encanto Estates Dogwood Major Arterial Full Street 2,500 LF
Cross Road Residential Collector Half Street 2,500 LF
Huston Secondary Arterial Half Street 5,230 LF
SE-2 P Street Major Arterial Half Street 2,600 LF
East Annexation P Street Major Arterial Full Street 1,600 LF
1st Street Industrial Collector Half Street 900 LF
SE-3 P Street Major Arterial Half Street 2,600 LF
Crown Commercial 1st Street Industrial Collector Full Street 2,640 LF
Huston Secondary Arterial Half Street 2,510 LF
Cross Secondary Arterial Full Street 2,600 LF
SE-5 Aten Road Major Arterial Half Street 5,280 LF
NE Cross/Aten Dogwood Road Major Arterial Full Street 2,640 LF
Future Road (E/W) Residential Collector Half Street 5,280 LF
Future Road (N/S) Residential Collector Full Street 2,640 LF
Cross Road Secondary Arterial Half Street 2,640 LF
SE-6 Clark Road Major Arterial Full Street 2,600 LF
S Aten/E RR Tracks Treshill Road Secondary Arterial Full Street 1,383 LF
Aten Road Major Arterial Half Street 2,900 LF
Source: 2007 Service Area Plan, 2015 Annexation Areas Updated per Imperial Planning Director.
87 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
4. Opportunities for Shared Facilities
While there are no real opportunities for shared roadway facilities with an adjacent
jurisdiction, the City’s system links with City of El Centro roadways, to the State
and with the County and State Highway system. The City continues to work with
local and State government agencies to monitor the operation of the regional
system for implementation of necessary improvements.
5. Phasing
Roadway improvements identified within City Limits are anticipated to be
completed within a five year timeframe. Improvements to circulation facilities
within annexation areas will be provided concurrently with new development as
noted in Table C-4. Each five year section identifies the total lineal fee of
roadway as well as the anticipated new mileage to be maintained by the City of
Imperial after annexation and improvement. By the end of the 20 year planning
period an additional 22.5 miles of new arterial and major collector roadways
constructed by developers are anticipated to be maintained by the City.
Developers are further responsible to pay all associated fair share costs of traffic
signals serving the development.
Table C-4 Phasing of Roadway Improvements In Annexation Areas
5 Year Plan
Annexation Area Street Street Type Width Length
N-3 Larsen Road Residential Collector Half Street 2,560 LF
Regional Park La Brucherie Major Arterial Half Street 2,490 LF
Ralph Road Major Arterial Full Street 2,490 LF
Nance Road Residential Collector Half Street 2,740 LF
N-4 Larsen Road Residential Collector Half Street 2,370 LF
Barioni Phase I Ralph Road Major Arterial Full Street 2,370 LF
La Brucheri Major Arterial Half Street 2,680 LF
N-5 Larsen Road Industrial Collector Half Street 2,640 LF
HBC Clark Road Major Arterial Half Street 2,640 LF
Ralph Road Major Arterial Half Street 2,640 LF
NE-2 Neckel Road Secondary Arterial Full Street 2,610 LF
Sanchez Ranch Dogwood Road Major Arterial Full Street 2,640 LF
Worthington Major Arterial Half Street 7,930 LF
Clark Road Major Arterial Half Street 1,260 LF
Clark Road Secondary Arterial Half Street 2,600 LF
SE-1 Worthington Major Arterial Half Street 7,640 LF
Encanto Estates Dogwood Major Arterial Full Street 2,500 LF
Cross Road Residential Collector Half Street 2,500 LF
Huston Secondary Arterial Half Street 5,230 LF
SE-2 P Street Major Arterial Half Street 2,600 LF
East Annexation P Street Major Arterial Full Street 1,600 LF
1st Street Industrial Collector Half Street 900 LF
SE-3 P Street Major Arterial Half Street 2,600 LF
Crown Commercial 1st Street Industrial Collector Full Street 2,640 LF
Huston Secondary Arterial Half Street 2,510 LF
Cross Secondary Arterial Full Width 2,600 LF
Total Lineal Feet 75,980
Additional Lineal Miles to be Maintained (Full Width) 11.5
88 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
10 Year Plan
Annexation Area Street Street Type Width Length
N-1 Larsen Road Residential Collector Half Street 4,930 LF
Barioni Lakes North Nance Road Residential Collector Full Street 2,570 LF
N-2 Larsen Road Residential Collector Full Street 2,590 LF
Barioni Lakes West La Brucherie Major Arterial Half Street 1,350 LF
Neckel Road Secondary Arterial Half Street 5,110 LF
Nance Road Residential Collector Half Street 2,740 LF
Austin Road Major Arterial Half Street 5,260 LF
NE-1 Neckel Road Secondary Arterial Full Street 5,320 LF
McFarland Ranch Dogwood Road Major Arterial Full Street 2,640 LF
SE-5 Aten Road Major Arterial Half Street 5,280 LF
NE Cross/Atem Dogwood Road Major Arterial Full Street 2,640 LF
Future Road (E/W) Residential Collector Half Street 5,280 LF
Future Road (N/S) Residential Collector Full Street 2,640 LF
Cross Road Secondary Arterial Half Street 2,640 LF
SE-6 Clark Road Major Arterial Full Street 2,600 LF
S Aten/E RR Tracks Treshill Road Secondary Arterial Full Street 1,383 LF
Aten Road Major Arterial Half Street 2,900 LF
Total Lineal Feet 57,873
Additional Lineal Miles to be Maintained (Full Width) 9.5
20 Year Plan
Annexation Area Street Street Type Width Length
W-1 La Brucherie Major Arterial Half Street 5,780 LF
Western Development Neckel Road Secondary Arterial Half Street 6,900 LF
15th Street Residential Collector Half Street 790 LF
Total Lineal Feet 13,470
Additional Lineal Miles to be Maintained (Full Width) 1.5
.
C. Mitigation
Most of the circulation improvements identified will be constructed by the future
developers as development occurs. The following are the recommended mitigation
measures:
C-1 For Industrial and Residential Collectors, the developer
shall be responsible for two street improvements including
one travel lane, curb, gutter, and sidewalk constructed to
City standards for all land fronting on said collectors.
C-2 For Major and Secondary Arterials, the developer shall be
responsible for frontage improvements including two
medians, one travel lane, curb, gutter, and sidewalk.
C-3 New development that results in increased traffic impacts
that exceed 5,000 vehicles per day on local streets shall
provide for a traffic study to outline needed improvements
to mitigate the increased traffic levels.
89 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
D. Financing
The existing funding sources for circulation improvements, maintenance and
operation come from the City’s general fund, Motor Vehicle In-Lieu Tax, State
Gas Tax, CalTrans, and LTA Measure D as well as developers. The City of
Imperial will continue to utilize these funding sources.
1. Current Costs and Per Capita Costs for Operation & Maintenance
The current cost for the continued maintenance and operation of the
circulation system in the City of Imperial is approximately $17.72 per
capita. The 2014 - 2015 City of Imperial budget allocated $306,817 for
Streets & Sidewalk maintenance which is primarily used to match available
transportation grant funds. Using the City’s current population of 17,313
residents, maintenance and operation of the circulation maintenance cost
approximately $17.72 per capita as calculated below and projected in Table
C-5.
$306,817 /17,313 population = $17.72 per capita
Table C-5 Projected Street Maintenance Costs
Year Projected Population Street Maintenance
Cost
2020 29,476 $522,366.89
2025 48,692 $862,908.41
2030 53,533 $948,699.50
2035 62,541 $1,108,226.52
2. Current Estimated Costs for Capital Improvements
Development Impact Fees are levied by the City of Imperial for circulation
facilities. Revenue generated by development impact fees for roadways are
placed in a separate fund and are used for specific circulation system and
roadway capital improvement projects. An assessment of street
improvement costs was prepared based on the City’s adopted Structural
Street Section improvement guide for roadway classifications as follows:
Street Classification Pavement Width Structural
Major Arterial 5.5” AC over 12” Class 2 AB
80 Feet
Secondary Arterial 4.5” AC over 12” Class 2 AB
50 Feet
Industrial Collector 4.5” AC over 12” Class 2 AB
44 Feet
Residential Collector 4.5” AC over 12” Class 2 AB
40 Feet
Source: BJ Engineering Gateway Street Structural Section Sheet BJ31
90 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
The Cost Estimate for Future Roadway Improvements - City Table C-6
and the Cost Estimate for Future Roadway Improvements – Annexation
Areas Table C-7 identify the roadway improvements needed for the City
and the annexation areas. The following street unit costs are assumed for
future circulation improvements in the respective tables (Please refer to
Appendix C for a complete Engineers Opinion of Probable Quantity and Cost
Calculation):
• Major Arterial - $916.00/LF
• Secondary Arterial - $571.00/LF
• Industrial Collector - $484.00/LF
• Residential Collector - $388.00/LF
Table C-6 Future Roadway Costs Within City Limits
Street Name/ Street Improvement/ Length Project Cost
(classifications) Segment Unit Cost
Aten Cross Road to Full Street
5,250 LF $4,809,000
(major arterial) Dogwood Road $916
La Brucherie Barioni Blvd to Half Street
9,900 LF $4,534,200
(major arterial) Larsen Road $458
Worthington P Street to Half Street
4,500 LF $2,061,000
(major arterial) 4,500 LF East $458
Dogwood Aten Road to Half Street
2,690 LF $1,232,020
(major arterial) Treshill Road $458
Ralph Highway 86 to Full Street
4,930 LF $4,515,880
(major arterial) Nance Road $916
Clark Street Aten Road to Half Street
2,690 LF $1,232,020
(major arterial) Treshill $458
P Street 1st Street to Half Street
(secondary arterial) 12th Street $285 4,200 LF $1,197,000
Neckel Highway 86 to Full Street
300 LF $171,300
(secondary arterial) Rodeo Drive $571
Neckel Rodeo Drive to Half Street
1,400 LF $399,000
(secondary arterial) 1,400 LF East $285
15th Street La Brucherie to Half Street
1,220 LF $236,680
(residential collector) E Street $194
Brewer Nance Road to Half Street
2,460 LF $477,240
(residential collector) La Brucherie $194
Shiloh Wall Road to Full Street
2,020 LF $783,760
(residential collector) Aten Road $388
La Brucherie Joshua Tree to Full Street
2,820 LF $1,094,160
(residential collector) Treshill $388
Total Estimated Construction Costs $22,743,260
10% Contingency $2,274,326
30% Design Engineering & Construction Management $6,822,978
Total Cost $31,840,564
91 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
The following are the assumptions used for the above unit costs:
• New construction for all streets identified.
• New construction includes grading, aggregate base, A.C. pavement, curb
gutter and sidewalk all built to City of Imperial standards by the contractor,
including subgrade.
• New construction also includes a 25% to project cost for mobilization of
equipment, permits, insurance, taxes, construction staking, air pollution
control district requirements, environmental requirements, stormwater
pollution prevention plans (SWPPP), geotechnical testing, striping and
signage, and traffic control during construction, etc.
• Acquisition of right-of-way land to be donated by future developer(s),
therefore no cost is assumed.
Table C-7 Future Roadway Costs by Annexation Areas
5-Year Unit Total
Street Street Type Width Length
Area Cost Cost
Larsen Road Residential Collector Half Street $194 2,560 LF $496,640
N-3
La Brucherie Major Arterial Half Street $458 2,490 LF $1,140,420
Ralph Road Major Arterial Full Street $916 2,490 LF $2,280,840
Nance Road Residential Collector Half Street $194 2,740 LF $531,560
Larsen Road Residential Collector Half Street $194 2,370 LF $459,780
N-4
Ralph Road Major Arterial Full Street $916 2,370 LF $2,170,920
La Brucherie Major Arterial Half Street $458 2,680 LF $1,227,440
Larsen Road Industrial Collector Half Street $242 2,640 LF $638,880
N-5
Clark Road Major Arterial Half Street $458 2,640 LF $1,209,120
Ralph Road Major Arterial Half Street $458 2,640 LF $1,209,120
Neckel Road Secondary Arterial Full Street $571 2,610 LF $1,490,310
NE-2
Dogwood Road Major Arterial Full Street $916 2,640 LF $2,418,240
Worthington Major Arterial Half Street $458 7,930 LF $3,631,940
Clark Road Major Arterial Half Street $458 1,260 LF $577,080
Clark Road Secondary Arterial Half Street $258 2,600 LF $670,800
Worthington Major Arterial Half Street $458 7,640 LF $3,499,120
SE-1
Dogwood Major Arterial Full Street $916 2,500 LF $2,290,000
Cross Road Residential Collector Half Street $194 2,500 LF $485,000
Huston Secondary Arterial Half Street $258 5,230 LF $1,349,340
P Street Major Arterial Half Street $458 2,600 LF $1,190,800
SE-2
P Street Major Arterial Full Street $916 1,600 LF $1,465,600
1st Street Industrial Collector Half Street $242 900 LF $217,800
P Street Major Arterial Half Street $458 2,600 LF $1,190,800
SE-3 1st Street Industrial Collector Full Street $484 2,640 LF $1,277,760
Huston Secondary Arterial Half Street $258 2,510 LF $647,580
Cross Secondary Arterial Full Street $571 2,600 LF $1,484,600
5-Year Plan Subtotal $35,251,490
92 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
10 Year Unit Total
Street Street Type Width Length
Area Cost Cost
Larsen Road Residential Collector Half Street $194 4,930 LF $956,420
N-1
Nance Road Residential Collector Full Street $388 2,570 LF $997,160
Larsen Road Residential Collector Full Street $388 2,590 LF $1,004,920
N-2
La Brucherie Major Arterial Half Street $458 1,350 LF $618,300
Neckel Road Secondary Arterial Half Street $258 5,110 LF $1,318,380
Nance Road Residential Collector Half Street $194 2,740 LF $531,560
Austin Road Major Arterial Half Street $458 5,260 LF $2,409,080
Neckel Road Secondary Arterial Full Street $571 5,320 LF $3,037,720
NE-1
Dogwood Road Major Arterial Full Street $916 2,640 LF $2,418,240
Aten Road Major Arterial Half Street $458 5,280 LF $2,418,240
SE-5
Dogwood Rd Major Arterial Full Street $916 2,640 LF $2,418,240
Future Rd (E/W) Residential Collector Half Street $194 5,280 LF $1,024,320
Future Rd (N/S) Residential Collector Full Street $388 2,640 LF $1,024,320
Cross Road Secondary Arterial Half Street $258 2,640 LF $681,120
SE-6 Clark Road Major Arterial Full Street $916 2,600 LF $2,381,600
Treshill Road Residential Collector Full Street $388 1,383 LF $536,604
Aten Road Major Arterial Half Street $194 2,900 LF $562,600
10-Year Plan Subtotal $24,338,824
20 Year Unit Total
Street Street Type Width Length
Area Cost Cost
La Brucherie Major Arterial Half Street $458 5,780 LF $2,647,240
W-1
Neckel Road Secondary Arterial Half Street $258 6,900 LF $1,780,200
15th Street Residential Collector Half Street $194 790 LF $153,260
20-Year Plan Subtotal $4,580,700
Total Estimated Annexation Area Construction Cost $64,171,014
10% Contingency $6,417,101
30% Design & Engineering $19,251,304
Total Cost in Annexation Areas $89,839,409
3. Future Funding Sources
Objective 8 of the General Plan Circulation Element states “the financing
of improvements to the City circulation system made necessary by new
development projects shall be borne by the developer, while the
maintenance and improvements of the existing street system shall be borne
by the City and its residents.”
The City of Imperial collects development impact fees as a means to assist
in the funding of future capital improvements to circulation facilities. Both
future residential and nonresidential developments will be required to pay
development impact fees.
Policy 8 of the Circulation Element suggests that the City utilize
assessment district financing, grants and other sources of revenue as well
as a five-year capital improvement plan to help finance City circulation
improvements. There are several funding sources for circulation facilities
93 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN CIRCULATION AND TRANSPORTATION
such as community facilities district, special assessment district,
Certificate of Participation, Safe, Accountable, Flexible, and Efficient
Transportation Equity Act (SAFETEA), Surface Transportation Program
(STP), as well as Community Development Block Grants and other state
and federal grants. Further descriptions of these and other financing
mechanisms are provided in the Financing section.
94 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
VIII. SANITARY SEWER
The City of Imperial owns, operates, and maintains a wastewater collection and
treatment system that services to the City of Imperial, and some isolated areas
immediately outside of the City boundary, but within the Sphere of Influence. The
Imperial Water Pollution Control Plant (IWPCP) is located at 701 East 14th Street,
located just east of the railroad tracks. The existing wastewater treatment plant is
currently located on a 4.68 acre site (net acreage) and services the entire City limits. The
IWPCP was constructed in the 1940’s and was rebuilt in 1995. The most recent
expansion was completed in 2004, and has a current treatment capacity of 2.4 million
gallons per day (MGD).
Much of the information for this section was acquired from the Master Plan for the
Sanitary Sewer Collection System for the City of Imperial prepared by BJ Engineering
and Surveying, Inc., and dated June 2008. Some of the information provided in this
section is paraphrased while other parts are used word-for-word from the Master Plan.
Additional information was provided by the City of Imperial Public Works Department.
For additional details relating to wastewater treatment and conveyance, the Master Plan
should be consulted.
A. Performance Standard
Although there are no adopted Performance Standards for wastewater treatment
and conveyance, there are design criteria and regulations that must be met to
ensure that adequate wastewater treatment and conveyance is provided. The
Performance standards and requirements for the Imperial Wastewater Treatment
Plant are further governed by the National Pollution Discharge Elimination System
(NPDES) discharge permit number CA0104400 adopted by the California Regional
Water Quality Control Board, Colorado River Basin Region on September 16, 2010,
by Board Order Number R7-2010-0020. The NPDES permit expires on September
30, 2015, and was being renewed as of the date of this Service Area Plan. The
NPDES permit establishes the Waste Discharge Requirements for the wastewater
treatment plant. The NPDES permit establishes the rated capacity of the wastewater
plant, discharge prohibitions, effluent limitations and discharge specifications,
receiving water limitations, standard provisions for the operation of the wastewater
treatment plant, monitoring and reporting program requirements, compliance
requirements, and special provisions. The NPDES discharge permit also establishes
minimum standards and criteria by which the IWPCP operates.
At a local level, the City further has established design criteria for the collection and
conveyance system. Design capacity of a pipeline is the general calculated capacity
of the pipeline using the Manning formula. For system analysis, peak dry weather
flow (PDWF) does not exceed 75 percent of the design capacity of the pipeline.
Accordingly, 25 percent of the pipeline capacity is reserved to accommodate peak
wet weather flow
95 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
(PWWF) incurred during wet weather conditions. The 25 percent reserve is
therefore provided to account for groundwater infiltration and rainfall dependent
inflow, plus additional sewer capacity reserve allowance. This 25 percent reserve
contingency factor is a commonly used allowance in evaluating wastewater utilities.
The following are the design criteria for determining pipeline capacity:
Table S-1 Pipeline Design Criteria
Pipe Diameter Design Criteria
8” to 10” ½ Full @ Peak Flow
12” to 18” ⅔ Full @ Peak Flow
21” or greater ¾ Full @ Peak Flow
Gravity pipelines should also have a general peak flow velocity of 2.0 fps (feet per
second) at PWWF to ensure adequate flow. Pipelines that cannot reach this
minimum flow velocity should be assisted with pump stations. Pump station
adequacy is based on two criteria: 1) the ability of the pump station to pump the
PWWF and 2) wet well adequacy for pump cycling.
B. Facility Planning and Adequacy Analysis
As previously noted, the 2.4 MGD wastewater treatment plant for the City of
Imperial is located in the northwest portion of the City within two parcels of land.
The major treatment units are located north of Fourteenth Street and east of the
Southern Pacific Railroad Right-of-Way on the 4.68 acre site. The City also owns
a 15-acre site, located northeast of the above-mentioned site, which is occupied
by treatment ponds for emergency use.
Over the last few years, the average daily flow to the City of Imperial
Wastewater Treatment Plant has varied, with monthly averages ranging from
1.4 million gallons per day (MGD) to 1.6 MGD during the 2014 calendar year.
1. Inventory of Existing Facilities
Wastewater Treatment Plant- The existing wastewater treatment plant uses
primarily an oxidation ditch-type process. The process flow scheme consists of a
headworks structure, an effluent pumping station, a grit chamber, an oxidation
ditch, an intermediate pump station, three secondary clarifiers, an ultra-violet
light disinfection chamber, an 18-inch diameter outfall line, an aerobic
digester, and 10 sludge drying beds. Exhibit 11- Wastewater Facilities identifies
the location of the Imperial Water Pollution Control Plant, the primary conveyance
system and pump stations
96 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
Exhibit 11- Wastewater Facilities
97 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
Wastewater Conveyance System- The topography of the City is fairly flat,
sloping gently to the northeast thus gravity flow is optimized. The existing
wastewater collection system consists of vitrified clay pipe (VCP) and
polyvinyl chloride (PVC) pipelines, and includes approximately 63 miles of
gravity sewers ranging in size from 6 to 24 inches in diameter, 16 lift
stations, and 6 miles of force mains. Trunk sewers in the major roads transport
wastewater to the treatment plant.
Wastewater Pumping Stations- As previously noted, the topography of the City
is fairly flat, thus pumping stations are necessary in order to receive flows and
pump them through force-mains located throughout the incorporated City limits.
Table S-2 details the sixteen pumping stations noted in Exhibit 12 and available
throughout the City.
Table S-2 Pump Station Inventory
Pump Pumps Station Location Facility Description
Station
PS-1 SW Corner of California Mid Winter Duplex self-priming pumping
Fair Grounds and east of Highway 86 units (150 GPM/ 200 GPM)
PS-2 Intersection of Barioni Boulevard and Two submergible pumping
“B” Street units (500 GPM)
PS-3 Intersection of Ralph Road and Single pumping unit (200
Highway 86 GPM)
PS-4 Intersection of Aten Road and Single pumping unit (350
Sandalwood Glen GPM)
PS-5 Intersection of La Brucherie Road & No specification available
Industry Way
PS-6 Aten Road near the Clark Road Single pumping unit (900
Intersection GPM)
PS-7 Aten Road near the Cross Road Two horizontal self pumping
Intersection units (250 GPM e/o)
PS-8 Shiloh Way, approximately 950 feet Duplex self-priming pumping
south of Aten Road units (250 GPM e/o)
PS-9 Joshua Tree Street, 240 feet more or Duplex self-priming pumping
less from the Blazing Star intersection units (300 GPM e/o)
PS-10 Legakes Avenue and Aten Road No specification available
intersection
PS-11 Imperial Business Park Road and Aten Duplex self-priming pumping
Road intersection units (220 GPM)
PS-12 Brewer Road and Mirador Street No specification available
intersection
PS-13 Rosarito Drive and Clark Road No specification available
intersection
PS-14 Morning Glory Trail and Sheffied No specification available
Avenue intersection
PS-15 First Street and Brighton Street No specification available
intersection
PS-16 Aten and Legaski No specification available
98 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
2. Adequacy of Existing Facilities
Wastewater Treatment Plant- The wastewater treatment facility has performed
adequately because of its inherently conservative design and the fact that the
existing flows (ranging between 1.4 MGD and 1.6 MGD) are less than the
design flow of 2.4 million gallons per day (MGD). Even with current planned
development, the flow would not increase to designed capacity until 2020.
The current wastewater treatment plant is undergoing a $3 Million capital
improvement project. The improvements consist of improvements to the
headworks screening and some internal pipeline reorganization.
Conveyance System- BJ Engineering and Surveying Inc., developed a
computer model of the existing City wastewater system using data which was
available for existing facilities and established flow estimates. Using this
model, the hydraulic capacity of the existing system was evaluated under peak
wet weather flow (PWWF) conditions in 2005. The results of the modeling
indicated that the existing system provides adequate capacity at average daily
flow (ADF) conditions, but during PWWF conditions, two pipelines did not
have adequate capacity. These pipelines are Pipes #14 and #17 and are
located along N Street between Barioni Boulevard and 12th Street. The flow into
these lines is currently being rerouted and capacity will be satisfactory upon
project completion.
The model also confirmed that the capacity remaining in the Barioni Boulevard
trunk sewer is required to serve future development in its dedicated service
area. The existing trunk sewer system is therefore not available to serve future
development areas outside of the present service area. The capacity of the
trunk line from B Street to N Street and from Barioni Boulevard to 14th Street
needs to be evaluated. It is estimated that 85% of this pipe section is clay and
has deteriorated over time which has resulted in reduced capacity. A similar
situation is occurring with the sewer trunk line in 13
th
Street from C Street to N
Street.
Wastewater Pumping Stations- Pump stations are constructed as development
occurs, thus many of the existing pump stations are aging. Pump Station #16 is
the newest, serving the Victoria Ranch Subdivision. Pump Station #16 is
expected to be placed into operation by the end of 2015. There are at least three
older pump stations that need improvements. Improvement priority is needed for
pump stations #1, #4 and #6 as they do not adequately meet the current demand.
Table S-3 Pump Station Adequacy details the current condition of all the pump
station facilities and further identifies the areas they serve.
99 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
Table S-3 Pump Station Adequacy
Pump Area/Development Serviced by 2015 Condition
Station Station
Sub-area VIII-Southern end, bound by HWY Needs Upgrade:
PS-1
86 on east, City limit on south, Myrtle Avenue From 150 GPM to 400 GPM
on the west and Aten Road on the north
Residential Area bound by Dahlia Park, Ben Adequate
PS-2
Hulse Elementary, and City Water Plant
Residential Area bound by Sunset Ranch Adequate
PS-3
Subdivision
Residential Area bound by Sandalwood Glen Adequate
PS-4
Subdivision and Wildflower North Subdivision
Industrial Area between Industrial and West of Adequate
PS-5
La Brucherie
Residential Area bound by Sandalwood Glen Adequate
PS-6
Subdivision and Wildflower North Subdivision
Paseo Del Sol Subdivision and Border Patrol Needs Upgrade:
PS-7
Station From 250 GPM to 500 GPM
Portion of South Colonia Adequate
PS-8
Wildflower North Subdivision and La Fuente Adequate
PS-9
Patio Homes
Victoria Ranch Subdivision Adequate
PS-10
Imperial Business Park Subdivision Adequate
PS-11
Monterrey Park Subdivision Adequate
PS-12
Bratton Subdivision Adequate
PS-13
Sky Ranch Subdivision Adequate
PS-14
Mayfield Ranch Subdivision Adequate
PS-15
Victoria Ranch Subdivsion Pending Activation (2015)
PS-16
Source: 2008 Master Plan for Sanitary Sewer Collection System & 2015 Interview with
Public Works Director.
3. Future Demand for Facilities
Assuming a conservative impact of 100 GPD (gallons per day) per capita
on the wastewater treatment facilities, the City projected Average Daily Flow
wastewater flow demand is as follows:
Table S-4 Daily Sewer Flow Projections
113FF
Year Projected Population Average Daily Flow
2020 29,476 2.497 MGD
2025 48,692 4.869 MGD
2030 53,533 5.353 MGD
2035 62,541 6.254 MGD
Demand is based on an assumed impact of 100 gallons per day per capita.
100 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
As previously noted, the City of Imperial average household size is 3.35 persons
per household. The average discharge of wastewater is 100 gallons per day per
person, thus each dwelling units discharges an average of 335 gallons per day.
Assuming an impact of 335 GPD (gallons per day) per Equivalent Dwelling Unit
(EDU) on the wastewater treatment facilities, the City was able to project non-
residential impacts to water facilities from commercial and industrial operations.
The projected average daily wastewater flow demand for all “units,” including non-
residential equivalent dwelling units, is as follows:
Table S-5 Daily Sewer Flow Projections with EDU’s
113FF
Planned
Total Planned Total
Cumulative Non-
Cumulative Equivalent Average Daily Flow
Year Residential
Development Dwelling Demand
Equivalent
Dwelling Units Units
Dwelling Units
2020 8,799 12,170 20,969 7.025 MGD
2025 14,535 16,936 31,471 10.542 MGD
2030 15,980 16,997 32,977 11.047 MGD
2035 18,669 17,057 35,726 11.968 MGD
Average Daily Flow is based on an assumed impact of 335 gallons per EDU
4. Opportunities for Shared Facilities
The City of Imperial has plans to relocate the treatment facilities out to the
Mesquite Lake area and build a regional Keystone Reclamation Plant to serve a
number of unincorporated commercial/industrial operations, the Imperial Valley
College and all of the City’s anticipated growth areas. The proposed wastewater
treatment facility is to be located near the Keystone/Mesquite Specific Plan Area
north of the City of Imperial in the jurisdiction of the County of Imperial and it will
be a shared facility. The City and the County are currently working together to
plan, construct and operate the treatment facility.
The design plans, specifications, and bid documents shall include all information
necessary to construct a fully functional 3.0 MGD average day capacity tertiary
facility in conformance with the operational intent described in the approved PDR.
The design shall be prepared to accommodate future plant expansions up to 10.0
MGD average day capacity. The design of the facility shall further conform to
current City of Imperial Standards, County of Imperial Standards, current UBC
requirements, AWWA requirements, and the “Greenbook” Standard
Specifications for Public Works Construction (current edition). If there are
conflicting standards, the City of Imperial Standard Drawings and Specification
shall prevail.
101 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
5. Phasing
Improvement phasing is recommended at five year increments for budgetary
purposes. Based on the results of the analysis performed by BJ
Engineering, the following backbone improvements are recommended in order
to provide adequate capacity during PWWF conditions:
Short Term Improvements
Remove and replace the existing 8" pipeline along Highway 86-
Imperial Avenue between Pumping Station #1 and Barioni Boulevard
(from MH #160 to MH #10) due to age and condition considerations.
Install 8" force main north along La Brucherie Road from Pumping
Station #10 to 15th Street.
5-10 Year Improvements
Remove and replace the existing 8" to 10" pipeline along Aten Road
between Shilo Road and Highway 86 (from MH #362 to MH #166) due
to age and condition considerations.
Install 12" gravity line east along 15th Street from 8" force main at La
Brucherie Road to Pumping Station #11.
10-15 Year Improvements
Slipline the existing 8" to 12" pipeline along 13th Street between C
and N Street (from MH #139 to MH #85A) due to age and condition
considerations.
Install Pumping Station #13 along Aten Road near Dogwood Road to
be able to serve Imperial Valley College
Construction of a new wastewater treatment facility - Keystone
Reclamation Plant with an initial average day treatment capacity of at
least 3.0 MGD to be expandable to 10 MGD. The facility shall be
constructed to provide tertiary treatment and meet all applicable Title
22 requirements for recycled water reuse.
20 Year Improvements
Provide improvements to the Keystone Reclamation Plant Wastewater
Treatment facility to expand capacity to meet projected growth.
C. Mitigation
The City of Imperial should continue to pursue various means by which to
obtain funding and provide for adequate wastewater conveyance facilities for the
existing and future residents of the City of Imperial. The following are
102 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
recommendations to maintain adequacy for wastewater treatment and
conveyance facilities:
S-1 Facilities identified in the Wastewater Master Plan
update shall be constructed as new development and
annexation of land occurs.
S-2 Prior to the recordation of a final map within any of the
annexation areas, a development agreement must be in
place to ensure that adequate wastewater facilities will be
provided during the PWWF conditions for the wastewater
conveyance system being utilized by said annexation area.
S-3 All system improvements shall be designed and
constructed in accordance with Federal, State and local
regulations.
S-4 Construct new wastewater treatment facility at Mesquite
Lakes.
D. Financing
The primary sources of revenue for wastewater treatment and conveyance
facilities are the sewer service charges and sewer capacity fees. The sewer
service charges function to subsidize off-site facilities such as sewer interceptors
and sewer treatment plant operation and maintenance. The sewer capacity fee
is based on the equivalent dwelling unit (EDU) impact created and funds
planned expansions of the City of Imperial Wastewater Treatment Plant. The
City will continue to utilize these funding sources in addition to searching for
other sources to improve the existing system in order to meet future demand.
1. Current Costs and Per Capita Costs
The current annual cost for the continued maintenance and operation of
the sewer system in the City of Imperial is approximately $197.28 per
capita. The 2014-2015 City of Imperial budgeted $3,415,567 for
wastewater operations and debt service. Using the City’s current
population of 17,313 residents, maintenance and operation of the
wastewater facilities cost approximately $197.28 per resident per year.
$3,415,567 / 17,313 population = $197.28 per capita
Using the City’s current population, the per capita cost of $197.28 for the
continued maintenance and operation of the sewer facilities are noted below
in Table S-6 in five year increments.
103 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN SANITARY SEWER
Table S-6 Projected Sewer Costs
Year Projected/Planned Sewer Costs
Population
2020 29,476 $5,815,124.64
2025 48,692 $9,606,121.89
2030 53,533 $10,561,170.69
2035 62,541 $12,338,088.48
Future cost estimates are based on current cost per capita for wastewater operations
and debt service. These costs do not yet reflect the improvements and financing of
the wastewater treatment facility to be located in the Keystone Reclamation site.
2. Future Funding Sources
The sewer service charge collected by the City is the primary funding
source. The city will continue to utilize the existing funding sources for
wastewater facilities. The current fees will need to be reviewed annually
and during proposed annexations to ensure that there is sufficient
funding to provide wastewater service to increased demand.
There are a number of financing mechanisms available to assist in the
funding for capital facilities related to the treatment and conveyance of
wastewater. Special assessment districts, community facility districts, local
bond issuance, developer contributions and development impact fees
can be used to fund wastewater treatment and conveyance facilities. Also,
there are a number of State and Federal grant and loan programs
available such as USDA Water and Waste Disposal Loans and Grants
for Public Works and Infrastructure Development and the Regional Water
Quality Control Board Clean Water State Revolving Fund. Further
descriptions of these and other financing mechanisms are provided under
the Financing section.
104 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DOMESTIC WATER
IX. DOMESTIC WATER
The City of Imperial owns, operates and maintains a system for the treatment, storage
and distribution of potable water resources that serves approximately 5,015 (January
2015) water service connections for residences and businesses within the City’s service
area and Sphere of Influence. The City purchases all of its untreated water from the
Imperial Irrigation District, which is conveyed to City facilities via IID’s Dahlia Canal via a
24-inch diameter raw water pipeline, and the Newside Canal as a secondary source via
27-inch and 16-inch diameter pipelines.
All information for this section was acquired from the Master Plan for the Water
Distribution System for the City of Imperial prepared by BJ Engineering and Surveying,
Inc. and dated 2008. Some of the information provided in this section is paraphrased
while other parts are used word-for-word from the Master Plan. Additional information
was provided by the City of Imperial Public Works Department. For additional details
relating to water facilities, the Master Plan should be consulted.
A. Performance Standard
Potable water must meet or exceed water quality standards established by the
California Department of Health Services and the US Environmental Protection
Agency. The California Department of Public Health further requires that specific
system pressures be maintained under normal and peak demand conditions. The
design criteria are based on Maximum Day Demand (MDD) plus fire flow. The
potable water system must be able to adequately treat and provide 150 gallons per
person per day as well as fire flow.
Although there are no adopted Performance Standards for water distribution,
there are design criteria that must be met to ensure that adequate potable water
supply and fire flow needs are provided. The design criteria are based on the
Maximum Day Demand @ Peak Hour plus fire conditions (MDPHF). Peaking factor
is 1.78. The treatment plant capacity shall further meet the demand of the maximum
daily flow, plus provide an operational storage capacity of at least 25 percent of the
maximum day demand used. Storage required is one maximum average day
demand plus a 2,500 GPM fire flow for a four-hour duration. The design criteria
includes the following:
Table W-1 Water Flow Standards
Flow Demand Maximum Pressure Level
Velocity
Maximum Day Demand + Fire Flow¹ 15.0 FT per second 20 psi – 35 psi
Maximum Day Demand 3.0 FT per second 32 psi ≥ 20 psi
¹Fire flow minimums are targeted at 1,200 GPM for residential, 2,000 GPM for commercial, and
2,500 GPM for industrial.
105 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DOMESTIC WATER
B. Facility Planning and Adequacy Analysis
The City’s Water Treatment Plant was completely rebuilt in 1995 and is located to
the west of town, just west of B Street at the north end of the airport runway. Raw
water from the Dahlia and Newside Canals is diverted into open reservoirs located
at the Water Treatment Plant. This water is then treated through a sedimentation,
filtration, and disinfection process in compliance with the Surface Water Filtration
and Disinfection Treatment Regulations (Chapter 17, Title 22, California Code of
Regulations), the California Department of Health Services, and Local Agency
requirements. The City utilizes a number of facilities to treat water to an acceptable
level of compliance as noted in Exhibit 12-Existing Water Facilities, and further
discussed below.
1. Inventory of Existing Facilities
Water Treatment Plant-The City of Imperial Water Treatment Plant currently
has a capacity of approximately 7.0 million gallons a day (MGD), which is
capable of providing adequate service for the entire City and proposed
annexation areas. The Plant is currently operating at 37% capacity. The
following is a summary of the present capacity of the individual plant
components:
Table W-2 Water Plant Facility Capacity by Component
Water Plant Component 2015 2015 Total
Capacity Each Capacity
24” Diameter Raw Water Gravity Pipeline 10.30 MGD 10.30 MGD
16” and 27” Diameter Raw Water Pipeline 7 MGD 7 MGD
Raw Water Reservoirs (3 Total) 10 MGD 10 MGD
Raw Water Pump Stations (2) 1.5 MGD ea 3.0 MGD
Raw Water Pump Stations (2) 3.5 MGD ea 7.0 MGD
Sedimentation Basins (4) 3.5 MGD ea 14 MGD
Filter Units (4) 2.5 MGD ea 10 MGD
Clean Water Pump Stations (3) 3.6 MGD ea 10.8 MGD
Chemical Feed System 6.9 MGD 6.9 MGD
Chlorinator 3.4 MGD 3.4 MGD
Service Pump Stations (3) 3.6 MGD ea 10.8 MGD
Water Storage- The surplus water is currently being stored at the water
treatment site in a 2.0 MG storage ground facility. A remote 2.0 MG
ground-level storage tank is located at the northeast corner of 13th and O
Streets intersection. Another 2.0 MG tank was constructed near Cross Road
and Fonzi Road. A future possible 2.0 MG and booster is planned near Barioni
Estates.
106 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DOMESTIC WATER
Exhibit 12-Existing Water Facilities Map
107 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DOMESTIC WATER
Pump Stations-To maintain sufficient water pressure (currently about 57/33 psi),
the City has three pump stations. One main station containing three pumps is
located at the Water Treatment Plant (WTP) and a smaller station consisting
of two pumps is located at the 2.0 MG storage tank at 13th Street and O
Street. The third is at the 2.0 MG storage tank at Cross and Fonzi and
contains two pumps. The pumps are used to keep water available and to assist
when higher pressure is required to fight fires. A standby generator that operates
the WTP at half capacity is used during emergencies.
Water Pipelines-The existing water distribution system includes 63 miles of
pipelines ranging in size from 2” to 16”. However, the minimum water pipeline
size for new development is generally 8” and existing pipelines under 4” are
earmarked for replacement. Furthermore, a large portion of the existing water
distribution system is up to 50 years old. The system contains Asbestos
Cement Pipe (ACP) and Polyvinyl Chloride Pipe (PVC). The ACP is the oldest
and accounts for roughly 46% of the total pipe length as of 2008. All new
pipelines are required to be PVC.
2. Adequacy of Existing Facilities
Water Treatment Plant- The water treatment facility is currently operating at 37%
of its designed capacity. Since the Water Treatment Plant has a current
capacity of 7.0 MGD, the existing facility can provide for an adequate supply of
potable water through the year 2025 into several areas planned for annexation
and development.
Water demand data available for estimating flow rates in the water distribution
system consist of total flow from the treatment plant. Based on available Public
Works records, the average daily demand from the water plant has varied with
monthly averages ranging between 1.7 million gallons per day (MGD) to 1.9 MGD.
The average daily demand was determined to be 1.9 MGD to err on the
conservative side.
Water Storage- The current water storage demand for the City is 4.312 MGD.
This number is based on a 3.45 MGD maximum daily flow, derived from the 2007
City of Imperial Service Area Plan, plus 25 percent of the maximum day demand
(0.862 MGD), for a total water storage demand of 4.312 MGD. The existing water
storage capacity of 6 MG is adequate.
Water Distribution System-A computer model of the existing water
distribution system was developed by BJ Engineering & Surveying Inc. using
available data for the existing facilities and the demand estimates stated above.
The capacity of the existing system was evaluated under Maximum Day Demand
at Peak- Hour plus fire conditions (MDPHF). The result of the modeling indicates
108 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DOMESTIC WATER
that the existing system provides adequate pressure for the Average Annual
Demand (AAD) condition, but that during MDPHF conditions many areas of
the City experience inadequate pressures. The existing water distribution
system is therefore not adequate to serve future development areas outside of
the present service area.
3. Future Demand for Facilities
Assuming the demand for approximately 150 gallons of potable water per day per
capita, the City’s average annual projected water use is as follows:
Table W-3 Daily Water Flow Projections
113FF
Year Projected Population Average Daily Flow
2020 29,476 4.421 MGD
2025 48,692 7.303 MGD
2030 53,533 8.029 MGD
2035 62,541 9.381 MGD
Demand is based on an assumed impact of 150 gallons per day per capita.
As previously noted, the City of Imperial average household size is 3.35 persons
per household. The average water consumption is 150 gallons per day per
person, thus each dwelling units consumes an average of 502.5 gallons per day.
Assuming an impact of 502.5 GPD (gallons per day) per Equivalent Dwelling
Unit (EDU) on the water treatment facilities, the City was able to project non-
residential impacts to water facilities from commercial and industrial operations as
follows:
Table W-4 Daily Water Flow Projections with EDU’s
F113F
Planned
Total Planned Total
Cumulative Non-
Cumulative Equivalent Average Daily Flow
Year Residential
Development Dwelling Demand
Equivalent
Dwelling Units Units
Dwelling Units
2020 8,799 12,170 20,969 10.537 MGD
2025 14,535 16,936 31,471 15.814 MGD
2030 15,980 16,997 32,977 16.571 MGD
2035 18,669 17,057 35,726 17.952 MGD
Average Daily Flow is based on an assumed impact of 502.5 gallons per day per EDU.
109 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DOMESTIC WATER
4. Opportunities for Shared Facilities
The City does not share water treatment, storage, or distribution facilities with
other jurisdictions. There may be an opportunity for an emergency
interconnection facility to be planned with the City of El Centro and the Heber
Public Utility District.
5. Phasing
In order to maintain an adequate water supply for the existing population as well
as provide for future development, the following improvements and future
facilities are recommended:
Short Term Improvements
Install a new 18” diameter waterline from the WTP along La
Brucherie Road to the Morningstar Subdivision.
Install a new 12” waterline from northwest side of Sky Ranch
Subdivision to the southwest side of Monterey Subdivision.
Install a new 12” waterline from north side of Sky Ranch
Subdivision to the south side of Monterey Subdivision to
achieve fire demand pressure (1,200 gpm) in this area.
5-10 Year Improvements
Install a new 12” water line from the west water treatment plan
reservoir along Banta Road up to Quartz Street on Savanna
Ranch Subdivision.
Install a new 12” waterline on 13
th
Street to connect across
Highway 86 to a 12” waterline located at the east side of the
Highway to achieve fire demand.
Construct one additional 2 MG storage tank at the Morningstar
Subdivision to insure adequate fire flow pressure. This new
tank will include four pumps that must be equal or better than
the existing pumps at the WTP.
Install a new 8” waterline from 13
th
Street across Highway 86.
Install a new 12” waterline from the WTP to the 2 MG tank
located at 14
th
Street and Clark road to provide refill capacity.
Install one additional 2 MG storage tank with four pumps near
the north east corner of La Brucherie Road and Aten Road.
15-Year Improvements
Install a new 14” waterline from 2 MG storage tank up to Ralph
110 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DOMESTIC WATER
Road on the northeast side of Sunset Ranch Estates
Subdivision and from there install a 12” waterline along Ralph
Road up to Rodeo Drive on the northwest side of Sunset
Ranch estates.
Install a new 12” waterline along Cross Road from Paseo Del
Sol to Mayfield Subdivision to achieve fire demand pressure in
Mayfield Subdivision.
C. Mitigation
The City of Imperial should continue to pursue various means by which to
obtain funding for and to provide for adequate water distribution facilities for
the existing and future residents of the City of Imperial. The following are
recommendations to achieve adequacy for water distribution facilities:
W-1 Facilities identified in the Water Master Plan update shall
be constructed as needed as new development and
annexation of land occurs.
W-2 Prior to the recordation of a final map within any of the
annexation areas, a development agreement shall be in
place to ensure that adequate water pressures will be
provided during the MDPHF conditions for the water
distribution system being utilized by said annexation area.
W-3 A potable water supply shall be provided for all annexation
areas.
W-4 Adequate fire flow, subject to the approval of the fire
department, shall be provided for all annexation areas.
W-5 All system improvements shall be designed and
constructed in accordance with Federal, State and local
regulations.
D. Financing
The primary sources of revenue for water treatment and distribution facilities are
the water service charges, water capacity fees and water turn on fees. The
City will continue to utilize these funding sources in addition to searching for
other sources to improve the existing system and in order to meet future demand.
The water capacity fee is based on the equivalent dwelling unit (EDU) impact
created and funds planned for capital improvements. The City will continue to
utilize these funding sources in addition to searching for other sources to
improve the existing system in order to meet future demand.
111 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN DOMESTIC WATER
3. Current Costs and Per Capita Costs
The current annual cost for the continued maintenance and operation of
the water system in the City of Imperial is approximately $256.42 per
capita. The 2014 – 2015 City of Imperial budget allocated $4,439,500 for
water services. Using the city’s current population of 17,313 residents,
operation and debt service of the water facilities cost approximately
$256.42 per resident per year.
$4,439,500 / 17,313 population = $256.42 per capita
Using the City’s current population, the per capita cost of $256.42 for the
continued maintenance and operation of the water facilities are noted below
in five year increments.
Table W-5 Projected Water Costs
Year Projected/Planned Water Costs
Population
2020 29,476 $7,558,407.09
2025 48,692 $12,485,885.40
2030 53,533 $13,727,242.74
2035 62,541 $16,036,763.22
4. Future Funding Sources
The water service charge collected by the City is the primary funding
source. These are charges based on the actual water usage. The City will
continue to utilize the existing funding sources for water facilities. The
current fees will need to be reviewed annually and during proposed
annexations to ensure that there is sufficient funding to supply water
service to new development.
There are a number of financing mechanisms available to assist in the
funding for capital facilities related to the delivery of potable water. Special
assessment districts, community facilities districts, local bond issuance,
developer contributions and development impact fees can be used to
fund water treatment and distribution facilities. Also, there are a number of
State and Federal grant and loan programs available such as USDA Water
and Waste Disposal Loans and Grants for Public Works and Infrastructure
Development as well as the State Water Resource Control Board Drinking
Water State Revolving Fund. Further descriptions of these and other
financing mechanisms are provided under the Financing section of this study.
112 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
FINANCING PLAN
I. INTRODUCTION
This section of the Service Area Plan discusses various financing mechanisms
available to the City of Imperial. It also describes how each existing facility is
currently financed and how future financial demands for these facilities can be
ensured. Recommended finance plans and available financing options are also
discussed.
Most financing options discussed in this section are subject to the guidelines of Prop
218. In 1996, Proposition 218, a Constitutional amendment was enacted. Prop 218
clearly defined general taxes and special taxes and set guidelines on the issuance,
use, and implementation of taxes. General taxes must be approved by a majority of
voters before they can be imposed, extended or increased. Special taxes require
approval by a 2/3 vote.
II. FINANCING OPPORTUNITIES AND CONSTRAINTS
There are many opportunities available to the City of Imperial to finance its
present and future facility needs. The following section briefly describes some of the
most widely used financing mechanisms.
A. Tax Revenue
A. General Taxes
General taxes generate revenue that is deposited in a City’s General Fund and
can be used to support various improvements and services including general
government operations, development services, public safety and community
services. These revenues can also be used to construct public facilities. The
City of Imperial can levy various types of general taxes, which include
property tax, franchise tax, sales tax and business license tax. Property taxes
generally comprise the largest revenue source for a City, but sales tax
revenue can be significant as well depending on the amount and types of
business within a City. However, the budget shows almost all general revenue
the City generates is utilized for the day-to-day operations of City government,
making it necessary to find other ways to finance facilities.
B. Gas Tax
The State levies a tax on all in-state sales of gasoline. A portion of the revenue
derived from the State taxes on gasoline is allocated to cities to be used
specifically for the construction, improvement and maintenance of streets and
roads.
113 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
C. Tax Levy for Local Bond Issues
Local governments can issue general obligation (GO) bonds to finance the
acquisition and construction of public capital facilities and real property. These
bonds cannot be used for operations and maintenance or to purchase
equipment. GO bond measures must be approved by 2/3 of the jurisdiction’s
voters. In order to pay back GO bonds, City’s are authorized to impose a
property tax levy at the rate needed for repayment of the principal and
interest of the bonds.
B. Fees
1. Development Impact Fees
Development Impact Fees can be a significant funding source to finance large
scale public facilities. These fees are intended to ensure that new
development pays its proportional share of public facilities based on the
impacts created by this new development. In concept, the City charges the
development community a series of adopted fees which provide the source of
income to pay for capital projects. When enough cash has been assembled,
the City constructs capital facility projects in order of priority. Development
Impact Fees can be used for the following public facilities:
Police Protection
Fire Protection
Streets & Traffic Signals
Storm Drainage
Water Treatment and Distribution
Wastewater Treatment and Conveyance
General Facilities
Open Space Acquisition, Park Land & Facilities
Public Library
2. User Fees
User fees are usually authorized by statute for specific uses and are typically
required for monthly service. The fees are used as a revenue source to
maintain the systems in proper operating condition and for the construction of
facilities needed to meet demand. These fees are charged to patrons or other
users on a fee-for-service basis.
3. Motor Vehicle In-Lieu Fee
Motor Vehicle in-lieu fees (VLF) are levied by the State for the ownership of
automobiles within the State. Funds are then returned to the County based on
114 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
population and distributed by the County to the cities, again, based on population.
C. Community/Developer Contributions
1. Developer/Builder Contribution
Many of the drainage, sewer, water and circulation improvements required as
a result of new development can be directly funded and constructed by the
developer and/or builder(s) through private funding sources. Facilities
earmarked for developer/builder funding are typically those which normally
would have been imposed as a condition of approval of a tentative map under
the City's existing development review process.
2. Donations
Donations are sometimes available for a specifically cause of facility. The City of
Imperial has a donation fund exclusively for the purchase of books.
D. Special Assessments/Districts
1. Special Districts
Special districts can be formed for the purpose of financing specific
improvements for the benefit of a specific area. People within a special district
must pay an additional property tax levy or user fees to help repay the bonds
issued by the district and finance the district’s ongoing operations. A detailed
report prepared by a qualified engineer is required, which must demonstrate
that the assessment amount is of special benefit to the parcel upon which the
assessment is levied. There are many assessment acts that govern the
formation of assessment districts such as the Improvement Act of 1911,
Municipal Improvement Act of 1913, Improvement Bond Act of 1915, Benefit
Assessment Act of 1982, Integrated Financing District Act as well as other
specific facility improvement acts. The provisions of Proposition 218 have
altered the procedures and facilities that can be financed through some of these
acts. Any assessment district formed must follow all applicable state laws
including the provisions set forth in Proposition 218.
2. Fire Suppression Assessment Act (Government Code Section 500078 et
seq.)
Under this act, a City is allowed to levy assessments on specific parcels or
zones for the provision of fire suppression services. A fire suppression
assessment does not require the formation of an assessment district, but
requires the adoption of an ordinance or resolution in which the parcels or zones
subject to the assessment must be identified. In addition, all requirements of
Proposition 218 must be met when imposing a fire suppression assessment.
115 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
3. Community Services District
A Community Services District (CSD) can serve as a source of funding for a
wide variety of facilities in both unincorporated and incorporated areas. CSDs
can levy a range of taxes including ad valorem property tax, general taxes and
special taxes, in addition to creating rates and other charges for services. Any
fee assessed within a CSD must directly relate to the benefit being received. As
a result, a CSD may be broken into zones which only pay for those facilities and
services that provide a benefit to that zone.
4. Community Facilities District
A Community Facilities District (CFD), not to be confused with a Community
Services District, falls under the 1982 Mello-Roos Community Facilities Act. This
Act allows a CFD to be established by cities, counties, special districts and
school districts to fund a variety of facilities and services. Note that the
boundaries of a CFD are not required to be contiguous as they are for a CSD.
In order for a CFD to be formed, a public hearing must occur and an election
held to authorize the specified tax levy. The special tax levy (Mello-Roos tax)
is used to either provide direct funding or pay off bonds. The facilities being
funded are not required to be physically located within the boundaries of the
CFD.
E. State and Federal Funding
Various government programs are available at the State and Federal levels to assist
local jurisdictions in financing public facilities and services. Most funding sources at
the State level require an application requesting assistance and specify the
projects or purposes for which the funds can be used. Financial assistance from the
state can include grants, low interest loans and matching funds. At the Federal
level financial assistance includes grants and federal matching funds for state run
assistance programs. State and Federal funding sources include the following:
1. State Funding
Local Law Enforcement Block Grant Program- Grant funds through the
State of California (in partnership with Imperial County) for participation in the
joint Local Law Enforcement Block Grant Act of 1995, to provide COP’s
(Citizens Option for Public Safety) Program to supplement local law
enforcement with additional equipment.
State Water Resources Control Board State Revolving Fund Programs-
The Division of Financial Assistance (DFA) administers the implementation of
the State Water Resources Control Board’s (State Water Board) financial
assistance programs that include loan and grant funding for construction of
116 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
municipal sewage and water recycling facilities, remediation for underground
storage tank releases, watershed protection projects, nonpoint source
pollution control projects, and other similar projects under the Clean Water
State Revolving Fund (CWSRF) for potable water treatment facilities and
distribution systems. Severely disadvantaged communities can obtain up to
100% grant funding.
California Department of Housing and Community Development- The
State Community Development Block Grant (CDBG) program was
established by the Federal Housing and Community Development Act of
1974, as amended (42 USC 5301, et seq.). The State CDBG program is
implemented by California Health and Safety Code section 50825, et seq,
and the California Code of Regulations (Title 25, Section 7050, et seq). The
primary federal objective of the CDBG program is the development of viable
urban communities by providing decent housing and a suitable living
environment and by expanding economic opportunities, principally for
persons of low and moderate income. Each year the program makes funds
available to eligible jurisdictions through several allocations. Under the
General Allocation, jurisdictions may apply for funding to subsidize public
facilities or special assessment districts.
California Department of Transportation –The State administers several
grant programs including the State Transportation Improvement Program,
which are roadway funds allocated for specific and joint decisions of Caltrans
and the Imperial County Transportation Commission. The Transportation
Development Act (Article 3) funds are other funds granted by the State
Transportation Commission for specific projects related to pedestrian, bicycle,
and wheelchair mobility.
2. Federal Funding
Federal Highway Administration –The State also administers several
federally funded grant programs for roadway safety and improvement
including: The Congestion Mitigation and Air Quality Improvement Program
(CMAQ). CMAQ funds are available for the specific purpose of developing
and implementing transportation programs that reduce traffic congestion and
air pollution; The Safe, Accountable, Flexible, and Efficient Transportation
Equity Act (SAFETEA). Under this act, federal funding is available for
highway, safety, and public transportation programs.
USDA Rural Assistance- There are a number of water, wastewater and
community facility loan and grant programs administered through USDA. Under
the Community Facilities Direct Loan & Grant Program, rural municipalities with
a population of 20,000 or less are eligible for funding of essential
community facilities such as first responder vehicles and equipment,
117 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
healthcare, public safety and public services from the Rural Utilities Service
(RUS) of the USDA. These facilities may further be used to finance city
halls, courthouses, community centers, airports, libraries, homeless shelters,
and animal shelters.
U.S. Economic Development Administration - Grants for Public Works
and Infrastructure Development. The objective of this grant is to promote
economic development and assist in the construction of facilities needed to
encourage the creation and retention of permanent jobs in areas
experiencing severe economic distress. The facilities can include water
and sewer systems, industrial access roads to industrial parks, rail road
siding and spurs, tourism facilities, vocational schools, business incubator
facilities and infrastructure improvements for industrial parks. The basic
grant may fund up to 50% of the cost of the facilities. For communities
that are severely depressed, the grant may fund up to 80% of the cost
of the facilities.
U.S. Environmental Protection Agency- The Environmental Protection
Agency makes low interest loans to communities to assist in the
construction of new or upgraded sewage treatment facilities. In partnership
with the North American Development Bank it also makes grant funds
available through the Border Environmental Infrastructure Fund Program for
jurisdictions within 62 miles of the US. Mexico border. EPA’s Border Water
Infrastructure Program provides grant assistance to communities along the
U.S./Mexico border to develop and construct infrastructure to provide safe
drinking water and adequate sanitation, and to improve water quality in
shared and trans-boundary waters. EPA funds grant programs through the
Border Environmental Cooperation Commission created in 1993 under a side
agreement to the North American Free Trade Agreement (NAFTA) for the
purpose of enhancing the environmental conditions of the US-Mexico border
region.
F. Other Financing
1. Financial Institution Financing
California Infrastructure and Economic Development Bank (IBank)- The
Infrastructure State Revolving Fund (ISRF) Program provides low-cost
financing to public agencies for a wide variety of infrastructure projects. ISRF
Program funding is available in amounts ranging from $50,000 to
$25,000,000, with loan terms of up to 30 years. Interest rates are set on a
monthly basis. Preliminary applications are continuously accepted.
118 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
2. Lease Financing
Instead of purchasing or issuing bonds, agencies can enter into a lease
agreement to acquire and dispose of property. Generally, one of two types
of lease agreements is entered. The first type is a lease-purchase agreement,
where an agency leases a facility while purchasing it. The second type is a
sale-leaseback agreement, where a facility is sold to a lessor by an agency,
which immediately leases the facility back to the agency. Leases are
designed to be tax-exempt investments and a properly constructed lease is not
considered a public debt. Lease financing requires finding an investor or group
of investors to invest in the return from the agency’s lease payments.
Certificates of Participation (COPs) are issued. Certificates of participation refer to
the undivided shares of the lease obligation, which are purchased by a group
of investors. COPs attract investors because they are designed to be a
source of tax-free interest income. If projects are too small to attract
investors or to be feasible for lease financing, local agencies can pool COPs.
Pooling COPs allows agencies to minimize the costs of initiating and issuing a
COP and may reduce the interest required to be paid on the lease. Entities
involved with a pooled COP must form a Joint Powers Authority (JPA) to
oversee the pooled COP.
119 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
III. FACILITY FINANCING
The following section provides a brief discussion of the funding sources used for the specific
services and facilities in the City of Imperial. Any sources of funding that are not currently
being utilized, as well as opportunities for cost avoidance, are identified.
A. Administrative Facilities
Current Funding
Funding for administrative facilities is currently provided by the General
Fund. Specific revenue sources include property and sales taxes, licenses
and permits, fines and penalties, charges for services and other
miscellaneous sources. Additionally, there are Special Revenue Transfers
to the General Fund that directly or indirectly fund administrative services.
Large-scale improvement projects would be funded by development impact
fees.
Cost Avoidance Opportunities
In order to reduce administrative services costs, the City of Imperial out
sources some of the administrative services such as City attorney, some
planning services and special project management.
Recommended Funding
In addition to the continued use of existing general funding sources, the
established development impact fees will help fund future administrative
facilities demand created by future development. If additional funding is
needed, then General Obligation Bonds can be issued or a citywide
community facilities district can be formed.
B. Drainage Facilities
Current Funding
Maintenance of storm water drainage facilities is currently funded by the
General Fund, including property and sales taxes, licenses and permits,
charges for services and other miscellaneous sources. Future storm water
drainage facilities will be installed at the developer/builder’s expense at
the time of construction and will be maintained using funds from the
General Fund.
120 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
Cost Avoidance Opportunities
In order to reduce drainage facilities maintenance and capital improvements
costs, the City of Imperial maintains only those storm water conveyance
facilities installed by newer development to control storm water runoff.
Some services are outsourced such as those capital improvement
projects requiring a special projects manager.
Recommended Funding
Funding for drainage facilities should continue to be borne by developers,
while some of the ongoing maintenance can continue to be part of the general
fund. Additional funding sources, if needed, should include the creation of a
citywide community facilities district, special assessment district or a
community services district.
C. Fire Facilities
Current Funding
Costs for the Imperial County Fire Department to provide fire protection
services to the City of Imperial are currently financed by property and
sales taxes from the General Fund. The City has a Service Contract with
the County which is valid for a one year term and the City of Imperial pays
the County a set amount per year.
Cost Avoidance Opportunities
In order to reduce fire protection services costs, the City of Imperial and
the Imperial County Fire Department maintain an agreement on a share of
costs for fire protection services. The County owns and operate most of the
large equipment. The City owns various hoses, nozzles, adapters,
breathing apparatus, as well as one 1,250 gallon pumper engine. The
County manages all personnel and provides for minor maintenance on all
equipment. The City provides insurance and major maintenance on the
pumper.
Recommended Funding
Current use of General Fund as a funding source for fire facilities should
continue to be used. In addition, development impact fees have been
implemented to ensure costs of future demand created by future
development can fund major capital investments. A special fire suppression
assessment district or a special tax can also be implemented to assist in
the financing of fire facilities costs.
121 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
D. Police/Law Enforcement Facilities
Current Funding
A portion of financing for police protection is currently financed by property
and sales taxes from the General Fund. Other funding sources include the
Narcotics Task Force, State C.O.P.S. Grant, State Police Technology Grant
and the Local Law Enforcement Block Grant (LLEBG). Development
impact fees are also used for larger investments and equipment.
Cost Avoidance Opportunities
In order to reduce police protection cost, the City of Imperial receives
dispatching services from the City of El Centro as a part of the 911 request
for emergency response.
Recommended Funding
Current General Fund and impact fee sources for law enforcement should
continue to be used. The development impact fees being collected will
ensure future development contributes its proportional share to the future
demand created.
E. Library Facilities
Current Funding
Library facilities are currently financed by property and sales taxes from the
General Fund and development impact fees. The library also accepts private
donations of books and material. Some grant funding has been made
available through the California Literacy Campaign Fund.
Cost Avoidance Opportunities
Although the amounts received are small, the library charges fees for
miscellaneous services such as copies of documents or publications. Through
inner library programs, the library shares resources with other libraries in the
region.
Recommended Funding
The City should continue using the General Fund as a current funding
source for library facilities. Additional funding sources such as community
facilities district, special assessment district, Community Block
Development Grants, and the State Public Library Fund should be pursued.
122 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
F. Park and Recreation Facilities
Current Funding
Park and recreational facilities are currently financed by property and
sales taxes from the General Fund, developers, and by user fees for
recreational activities and pool use.
Cost Avoidance Opportunities
A parks master plan was being prepared by Wallace Roberts & Todd
Planning Design in 2008 but as of 2015 is yet to be completed. The master
plan intends to provide implementing measures to upgrade and improve the
City’s park system.
Recommended Funding
Current funding sources should continue to be used as a source for
financing park and recreational facilities. It would also be beneficial to
develop and implement a five-year capital improvement plan for all park and
recreational facilities within the City as recommended by the General Plan.
The City should also pursue funding through the State Department of Parks
and Recreation.
G. Circulation Facilities
Current Funding
Funding for circulation facilities is provided by the General Fund, Motor
Vehicle-In-Lieu Tax, State Gas Tax and the Local Transportation Authority
(LTA) Measure D Sales Tax Fund, as development impact fees and
developer funding. Developer funding is used to construct required street
improvements associated with a specific project. FHWA/CalTrans Grant
Programs are also used by the City including Congestion Management Air
Quality Grant Fund (CMAQ), State Transportation Improvement Program
(STIP), Regional Surface Transportation Program (RSTP), and
Transportation Development Account-Article 3 funds.
Cost Avoidance Opportunities
Although there are no real opportunities to share roadway facilities with any
adjacent jurisdiction, the City’s system does not exist independently and
circulation within and through the City is mutually affected by the operation of
the circulation system along the north end of El Centro, the County roadway
system and the State circulation system. The City will continue to cooperate
with the City of El Centro, County of Imperial and the State in monitoring the
123 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
operation of the regional system and the implementation of necessary
improvements.
Recommended Funding
Current funding sources for circulation facilities should continue to be
used. Additionally, there are several funding mechanisms for circulation
facilities such as community facilities district, special assessment district,
and Certificate of Participation. There are also a number of additional grant
funding programs including the Safe, Accountable, Flexible, and Efficient
Transportation Equity Act (SAFETEA), Active Transportation Program
(ATP), as well as Community Development Block Grants and other state
and federal grants which should be pursued, as suggested by the Circulation
Element of the City’s General Plan.
H. Wastewater Treatment and Sewer Facilities
Current Funding
The City used funds from revenue bonds (Wastewater Bond 2012) for
expenditures related to improvements and enhancements to the Wastewater
Facilities. The primary sources of revenue for wastewater treatment and
conveyance facilities are the sewer service charges and sewer connection
fees collected in the City’s Enterprise Fund. Operation, maintenance,
salaries, and equipment purchases are financed by the Wastewater
Enterprise Fund. The sewer service charges function to subsidize off-site
facilities such as interceptors and sewer treatment plants. The sewer
connection fee is dependent upon the size of the sewer line needed to
serve the area and whether the street or alley is paved.
Cost Avoidance Opportunities
The City often requires developers to construct wastewater-related
infrastructure that will connect a specific development with the existing City
wastewater system. In order to further reduce wastewater treatment facilities
maintenance and capital improvement costs, the City of Imperial out sources
services requirement a special project management for some of the City’s
wastewater treatment and conveyance system capital improvement projects.
Recommended Funding
The current fee structure will need to be reviewed annually and during
proposed annexations to ensure that there is sufficient funding to provide
wastewater service to new development. Special assessment districts,
community facilities districts, local bond issuance and development impact
124 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN FINANCING PLAN
fees should be considered as alternative funding sources for wastewater
treatment and conveyance facilities. Also, State and Federal grant and
loan programs are available such as the Water Resources Control Board
Clean Water State Revolving Fund and USDA Water and Waste disposal
Loans and Grants for Public Works and Infrastructure Development.
I. Water Facilities
Current Funding
The City used funds from revenue bonds (Waster Bond 2012) for
expenditures related to improvements and enhancements to the Water
Treatment Plant and distribution facilities. The primary sources of revenue
for water treatment and distribution facilities are the water service charges,
water connection fees and water turn on fees tied to the City’s Enterprise
Fund. Operation, maintenance, salaries, and equipment purchases are
financed the Water Enterprise Fund. Developer funding is used for specific
project water improvements.
Cost Avoidance Opportunities
The City often requires developers to construct water-related infrastructure
that will connect a specific development to the City’s existing potable water
system. In order to reduce water facilities maintenance and capital
improvement costs, the City of Imperial further out sources services requiring
a special projects manager for some of the City’s water treatment and
water conveyance system capital improvement projects.
Recommended Funding
The current fee structure will need to be reviewed annually and during
proposed annexations to ensure that there is sufficient funding to supply
water service to new development. Special assessment districts, community
facilities districts, local bond issuance and development impact fees should
be considered as alternative funding mechanisms for water treatment and
distribution facilities. State and Federal grant and loan programs should be
pursued including the Water Resources Control Board Drinking Water State
Revolving Fund and USDA Water and Waste disposal Loans and Grants for
Public Works and Infrastructure Development.
125 CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN APPENDICES
APPENDIX A
City of Imperial Adopted Municipal Budget FY 2014-2015
CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN APPENDICES
APPENDIX B
Agreement for Fire Protection Services between
County of Imperial and City of Imperial
CITY OF IMPERIAL
September 2015
SERVICE AREA PLAN APPENDICES
APPENDIX C
Engineers Opinion of Probable Quantity & Cost Calculation
CITY OF IMPERIAL
September 2015
Engineers Opinion of Probable Quantity & Cost Calculation
1. INDUSTRIAL COLLECTOR
A. Assumptions
1. Assume pavement section of 4 inches A.C. over 11 inches of Class 2
Aggregate Base based upon City of Imperial – Gateway Street
Structural Section Sheet prepared by B.J. Engineering dated 11/21/08
2. Assume 6 inch pcc curb and gutter
3. Assume 4 inch deep, 4.5 foot wide pcc sidewalk
4. Assume paved road width is 44 feet
5. Assume Right of Way width is 70 feet
6. Assume demolition, earthwork import/export, native subgrade
preparation, limited driveway entrances, pcc curb returns, pcc
crossgutters and street lights in the unit costs for A.C. pavement,
class 2 base, pcc curb and gutter and sidewalk.
7. Assume State of California Department of Industrial Relations
Wage Determinations (Prevailing Wages) are applicable.
B. Costs
1. A.C. Pavement
1’ x 1’ x 4”/12”/foot x 150 lb/cubic foot = 0.025 tons/sf
2,000 #/Ton
44 feet wide x 1 foot x 0.025 tons/sf = 1.1 tons
1.1 tons A.C./lineal foot of road x $130.00/ton = $143/l.f.
$143.00/lineal foot of road for A.C. pavement cost
2. Class 2 Base beneath A.C. Pavement
1’ x 1’ x11”/12”/foot x 138 lb/cubic foot = 0.0633 tons/sf
2,000 #/Ton
44 foot wide x 1 foot x 0.0633 tons/s.f. = 2.79 tons
2.79 tons/l.f. of road x $44/ton = $122.76/l.f. of road
Rounded off use $123/lineal foot of road for Class 2 Base Cost
3. 6 inch curb and gutter
$27.00/lineal foot of curb and gutter
2 l.f. of curb and gutter/1 l.f. of road x $27.00/lineal foot =
$54.00/lineal foot of roadway – 6 inch curb and gutter cost
4. 4 inch pcc sidewalk
$7.50/square foot of sidewalk
2 sides of the street x 4.5’ x 1’ x $7.50/s.f. = $67.50/s.f.
$67.50/lineal foot of roadway – 4 inch pcc sidewalk
5. Subtotal of A.C. Pavement, Class 2 Base, curb and gutter and
pcc sidewalk cost
143/l.f. + 123/l.f. + 54/l.f. + 67.50/l.f. = $387.50/l.f.
6. Add 25 percent to the project cost for mobilization of
equipment, permits, insurance, taxes, construction staking,air
pollution control district requirements, environmental
requirements, stormwater pollution prevention plans (SWPPP)
and/or erosion control plan/BMP’s, geotechnical testing,
striping and signage, traffic control during construction and
similar requirements.
7. Total per lineal foot cost of Major Arterial Improvement
387.50/l.f. x 0.25 percent + 387.50/l.f = $484.38/l.f.
Rounded off total lineal foot Industrial Street improvement
cost is $484/lineal foot of street
2. MAJOR ARTERIAL
A. Assumptions
1. Assume pavement section of 5.5 inches A.C. over 12 inches of
Class 2 Aggregate Base based upon City of Imperial – Gateway Street
Structural Section Sheet prepared by B.J. Engineering dated 11/21/08
2. Assume 8 inch pcc curb and gutter
3. Assume 4 inch deep, 4.5 foot wide pcc sidewalk
4. Assume paved road width is 80 feet
5. Assume Right of Way width is 102 feet
6. Assume demolition, earthwork import/export, native subgrade
preparation, limited driveway entrances, pcc curb returns, pcc
crossgutters and street lights in the unit costs for A.C. pavement,
class 2 base, pcc curb and gutter and sidewalk.
7. Assume State of California Department of Industrial Relations
Wage Determinations (Prevailing Wages) are applicable.
B. Costs
1. A.C. Pavement
1’ x 1’ x 5.5”/12”/foot x 150 lb/cubic foot = 0.03438 tons/sf
2,000 #/Ton
80 feet wide x 1 foot x 0.03438 tons/sf = 2.75 tons
2.75 tons A.C./lineal foot of road x $130.00/ton = $357.50/l.f.
$358.00/lineal foot of road for A.C. pavement cost
2. Class 2 Base beneath A.C. Pavement
1’ x 1’ x 12”/12”/foot x 138 lb/cubic foot = 0.0690 tons/sf
2,000 #/Ton
80 foot wide x 1 foot x 0.0690 tons/s.f. = 5.52 tons
5.52 tons/l.f. of road x $44/ton = $242.88/l.f. of road
Rounded off use $243/lineal foot of road for Class 2 Base Cost
3. 8 inch curb and gutter
$32.00/lineal foot of curb and gutter
2 l.f. of curb and gutter/1 l.f. of road x $32.00/lineal foot =
$64.00/lineal foot of roadway – 8 inch curb and gutter cost
4. 4 inch pcc sidewalk
$7.50/square foot of sidewalk
2 sides of the street x 4.5’ x 1’ x $7.50/s.f. = $67.50/s.f.
$67.50/lineal foot of roadway – 4 inch pcc sidewalk
5. Subtotal of A.C. Pavement, Class 2 Base, curb and gutter and
pcc sidewalk cost
358/l.f. + 243/l.f. + 64/l.f. + 67.50/l.f. = $732.50/l.f.
6. Add 25 percent to the project cost for mobilization of
equipment, permits, insurance, taxes, construction staking,
air pollution control district requirements, environmental
requirements, stormwater pollution prevention plans (SWPPP)
and/or erosion control plan/BMP’s, geotechnical testing,
striping and signage, traffic control during construction and
similar requirements.
7. Total per lineal foot cost of Major Arterial Improvement
732.50/l.f. x 0.25 percent + 732.50/l.f = $915.63/l.f.
Rounded off total lineal foot Major Arterial improvement cost
is $916/lineal foot of street
3. RESIDENTIAL COLLECTOR
A. Assumptions
1. Assume pavement section of 3 inches A.C. over 9 inches of Class 2
Aggregate Base based upon City of Imperial – Gateway Street
Structural Section Sheet prepared by B.J. Engineering dated 11/21/08
2. Assume 6 inch pcc curb and gutter
3. Assume 4 inch deep, 4.5 foot wide pcc sidewalk
4. Assume paved road width is 40 feet
5. Assume Right of Way width is 60 feet
6. Assume demolition, earthwork import/export, native subgrade
preparation, limited driveway entrances, pcc curb returns, pcc
crossgutters and street lights in the unit costs for A.C. pavement,
class 2 base, pcc curb and gutter and sidewalk.
7. Assume State of California Department of Industrial Relations
Wage Determinations (Prevailing Wages) are applicable.
B. Costs
1. A.C. Pavement
1’ x 1’ x 3”/12”/foot x 150 lb/cubic foot = 0.01875 tons/sf
2,000 #/Ton
40 feet wide x 1 foot x 0.01875 tons/sf = 0.75 tons
0.75 tons A.C./lineal foot of road x $130.00/ton = $97.50/l.f.
$98.00/lineal foot of road for A.C. pavement cost
2. Class 2 Base beneath A.C. Pavement
1’ x 1’ x 9”/12”/foot x 138 lb/cubic foot = 0.05175 tons/sf
2,000 #/Ton
40 foot wide x 1 foot x 0.05175 tons/s.f. = 2.07 tons
2.07 tons/l.f. of road x $44/ton = $91.80/l.f. of road
Rounded off use $91/lineal foot of road for Class 2 Base Cost
3. 6 inch curb and gutter
$27.00/lineal foot of curb and gutter
2 l.f. of curb and gutter/1 l.f. of road x $27.00/lineal foot =
$54.00/lineal foot of roadway – 6 inch curb and gutter cost
4. 4 inch pcc sidewalk
$7.50/square foot of sidewalk
2 sides of the street x 4.5’ x 1’ x $7.50/s.f. = $67.50/s.f.
$67.50/lineal foot of roadway – 4 inch pcc sidewalk
5. Subtotal of A.C. Pavement, Class 2 Base, curb and gutter and
pcc sidewalk cost
98/l.f. + 91/l.f. + 54/l.f. + 67.50/l.f. = $310.50/l.f.
6. Add 25 percent to the project cost for mobilization of
equipment, permits, insurance, taxes, construction staking,
air pollution control district requirements, environmental
requirements, stormwater pollution prevention plans (SWPPP)
and/or erosion control plan/BMP’s, geotechnical testing,
striping and signage, traffic control during construction and
similar requirements.
7. Total per lineal foot cost of Major Arterial Improvement
310.50/l.f. x 0.25 percent + 310.50/l.f = $388.13/l.f.
Rounded off total lineal foot Residential Street improvement
cost is $388/lineal foot of street
4. SECONDARY ARTERIAL
A. Assumptions
1. Assume pavement section of 4.5 inches A.C. over 12 inches of
Class 2 Aggregate Base based upon City of Imperial – Gateway Street
Structural Section Sheet prepared by B.J. Engineering dated 11/21/08
2. Assume 6 inch pcc curb and gutter
3. Assume 4 inch deep, 4.5 foot wide pcc sidewalk
4. Assume paved road width is 50 feet
5. Assume Right of Way width is 84 feet
6. Assume demolition, earthwork import/export, native subgrade
preparation, limited driveway entrances, pcc curb returns, pcc
crossgutters and street lights in the unit costs for A.C. pavement,
class 2 base, pcc curb and gutter and sidewalk.
7. Assume State of California Department of Industrial Relations
Wage Determinations (Prevailing Wages) are applicable.
B. Costs
1. A.C. Pavement
1’ x 1’ x 4.5”/12”/foot x 150 lb/cubic foot = 0.02813 tons/sf
2,000 #/Ton
50 feet wide x 1 foot x 0.02813 tons/sf = 1.41 tons
1.41 tons A.C./lineal foot of road x $130.00/ton = $183.00/l.f.
$183.00/lineal foot of road for A.C. pavement cost
2. Class 2 Base beneath A.C. Pavement
1’ x 1’ x 12”/12”/foot x 138 lb/cubic foot = 0.0690 tons/sf
2,000 #/Ton
50 foot wide x 1 foot x 0.0690 tons/s.f. = 3.45 tons
3.45 tons/l.f. of road x $44/ton = $151.80/l.f. of road
Rounded off use $152/lineal foot of road for Class 2 Base Cost
3. 8 inch curb and gutter
$27.00/lineal foot of curb and gutter
2 l.f. of curb and gutter/1 l.f. of road x $27.00/lineal foot =
$54.00/lineal foot of roadway – 6 inch curb and gutter cost
4. 4 inch pcc sidewalk
$7.50/square foot of sidewalk
2 sides of the street x 4.5’ x 1’ x $7.50/s.f. = $67.50/s.f.
$67.50/lineal foot of roadway – 4 inch pcc sidewalk
5. Subtotal of A.C. Pavement, Class 2 Base, curb and gutter and
pcc sidewalk cost
183/l.f. + 152/l.f. + 54/l.f. + 67.50/l.f. = $456.50/l.f.
6. Add 25 percent to the project cost for mobilization of
equipment, permits, insurance, taxes, construction staking,
air pollution control district requirements, environmental
requirements, stormwater pollution prevention plans (SWPPP)
and/or erosion control plan/BMP’s, geotechnical testing,
striping and signage, traffic control during construction and
similar requirements.
7. Total per lineal foot cost of Major Arterial Improvement
456.50/l.f. x 0.25 percent + 456.50/l.f = $570.63/l.f.
Rounded off total lineal foot Secondary Arterial improvement
cost is $571/lineal foot of street