LAFCO
Niland County Service Area No 1 Service Area Plan
Read the report at Local Agency Formation Commissions ↗
JANUARY 2017
COUNTY OF IMPERIAL
NIL AND COUNT Y
SERVICE ARE A #1
SERVICE AREA PLAN (SAP)
5620 FRIARS ROAD, SAN DIEGO, CA 92110 / 619.291.0707 / RICKENGINEERING.COM
TABLE OF CONTENTS
SECTION PAGE
SECTION 1 – EXECUTIVE SUMMARY..................................................................................... 1
1.1 Introduction ...................................................................................................................... 1
1.2 Public Service and Facilities ............................................................................................ 1
1.3 Financing Summary ......................................................................................................... 2
SECTION 2 – INTRODUCTION .................................................................................................. 3
SECTION 3 – GROWTH AND PHASING PROJECTIONS .........................................................7
3.1 Existing Land Use ............................................................................................................ 7
3.2 Planned Land Use ............................................................................................................ 7
3.3 Projected Population Increase .......................................................................................... 7
3.4 Theoretical Buildout Projections ..................................................................................... 7
SECTION 4 – STREETLIGHT FACILITIES .................................................................................9
SECTION 5 – FINANCING ......................................................................................................... 17
APPENDIX A – Niland Streetlight Master Plan
LIST OF TABLES
TABLES PAGE
Table 3-1, Population ...................................................................................................................... 7
LIST OF FIGURES
FIGURES PAGE
Figure 2-1, Project Vicinity Map .................................................................................................... 6
Figure 3-1, Niland Photo................................................................................................................. 6
Figure 4-1, Streetlight Photo 1 ...................................................................................................... 10
Figure 4-2, Streetlight Photo 2 ...................................................................................................... 11
Figure 4-3, Streetlight Location Map............................................................................................ 15
Niland County Service Area No. 1 Service Area Plan Table of Contents
January 2017 Page i
This Page Intentionally Left Blank.
Niland County Service Area No. 1 Service Area Plan Table of Contents
January 2017 Page ii
SECTION 1 - EXECUTIVE SUMMARY
1.1 INTRODUCTION
This Service Area Plan (SAP) outlines the County Service Area (CSA) No. 1 known as Niland.
This SAP outlines Niland’s existing public services and facilities as they relate to the streetlights,
estimates the current and future anticipated demand for such facilities and services, and describes
how necessary facilities and services will or may be developed and extended to meet demands.
1.2 PUBLIC SERVICES & FACILITIES
Streetlight Facilities
The streetlights in the Niland Street Lighting District, County Service Area 1, are maintained by
the Imperial County Department of Public Works. Imperial Irrigation District supplies the
electrical power for the streetlights and the town site and maintains all existing electric
transmission lines and the existing IID Substation located north of Beal Road.
Mitigation
Mitigation will be the actual construction and maintenance of the streetlights at the time adjacent
development occurs.
Current Funding
The Imperial County Board of Supervisors reauthorized the dwelling unit assessment in the
amount of $14 for the Niland CSA streetlights in 2016, as it has every year since 1989.1 The total
revenue generated by the unit fee varies from year to year. The County’s budgets for fiscal years
2014–2015, 2015–2016, and 2016–2017 indicate assessment revenues of $13,200, $19,000
(actual, estimated) and $16,000 (recommended), respectively. Since the dwelling unit fee is
constant and applied to the property tax bill of every parcel in the CSA, the variability must be
due to delinquencies in any one year followed by payment in subsequent years of the taxes and
assessments that are in arrears. Based on the average assessment revenues, the number of taxable
parcels in the CSA is approximately 1,150. If 10% of the property owners are delinquent in any
year, the delinquency would account for a $1,600 shortfall in that year.
Cost Avoidance Opportunities
The general condition of the streetlights needs improvement and the streetlights would benefit
from an increased level of maintenance. The CSA’s revenue versus expense net surplus of
$11,600 this year, $6,100 last year, and $9,400 the year prior indicate that the maintenance level
could be enhanced and still remain within the CSA’s budget. The County currently pays the
Imperial Irrigation District (IID), the owner of the streetlights, to maintain the system. With the
goal of improving the overall level of maintenance, the County should explore the possibility of
negotiating a service agreement with IID that would establish performance and monitoring
1 County Board of Supervisor’s Resolution 2016-105
Niland County Service Area No. 1 Service Area Plan Section 1 – Executive Summary
January 2017 Page 1
standards. The enhanced maintenance could be funded by the apparent surplus. Consideration
should also be given to a program of changing out fixtures to LED to save on replacements and
electric bills.
Recommended Funding
No specific recommendations for further funding.
1.3 FINANCING SUMMARY
Existing Revenue Sources
The Niland Lighting District (Niland County Service Area [CSA] No.1) receives revenues
primarily from the annual “unit fee” assessment authorized and established each year by the
Imperial County Board of Supervisors. The unit fee of $14 per parcel was established by
resolution on September 27, 2016.2 The unit fee has not changed since the last increase in 1989.
Total revenue generated varies. The County’s budgets for fiscal years 2014–2015 (actual) and
2015–2016 (actual estimated) indicate assessment revenues of $13,200 and $19,000,
respectively. The recommended revenue for FY 2016-2017 is $16,0003
Future Revenue Sources
Under the current structure of the Niland CSA, the unit fee assessment at $14 per parcel is the
only option that does not require a vote of the property owners. The current fee is grandfathered
under Proposition 218 (passed in 1996). Street lighting is a special benefit and not considered a
“property-related” service under Article XIII(D) of the California Constitution. Since 1996, a
Proposition 218 special assessment process is required to increase the unit fee.
Existing Financing Mechanisms
Over the two most recent fiscal years, the revenues and expenditures of the CSA show a surplus.
This surplus, presumably with previous annual surpluses, has resulted in a fund asset balance of
$172,000.4 Therefore the opportunity exists for the Niland CSA to self-finance improvements to
the streetlights by using the fund balance directly or borrowing from the County General Fund.
Future Financing Mechanism
As discussed above, limited financing of future improvements is possible through the use of the
fund balance as collateral and future reimbursement for a loan from the County General Fund. A
somewhat less likely option would be the restructuring of Niland CSA No. 1 along the lines of a
Lighting and Landscape Maintenance District so that additional funds could be generated and
used to enhance the level of service and improve maintenance. The obvious difficulty with this
option is the voter-approval requirement and the fact that fund balances from previous years may
need to be factored in the annual levy (establishment of a minimum reserve for capital would
2 County Board of Supervisor’s Resolution 2016-105,
3 County of Imperial final adopted budget for FY 2016-2017
4 Niland CSA No.1 Balance Sheet FY 2016–2017.
Niland County Service Area No. 1 Service Area Plan Section 1 – Executive Summary
January 2017 Page 2
solve this). However, therein lies the benefit for the voter—that the potential exists for the unit
fee to decrease if cost avoidance practices are implemented.
Niland County Service Area No. 1 Service Area Plan Section 1 – Executive Summary
January 2017 Page 3
This Page Intentionally Left Blank.
Niland County Service Area No. 1 Service Area Plan Section 1 – Executive Summary
January 2017 Page 4
SECTION 2 – INTRODUCTION
2.1 Background
The County of Imperial encompasses 4,284 square miles and is home to over 180,000 residents
and over 62,000 jobs. The Niland County Service Area (CSA) No. 1 is located in the northern
half of the Imperial Valley, east of the Salton Sea on State Highway 111. The unincorporated
area is bounded on the west by Nieto Road, on the north by the Union Pacific Railroad tracks,
and (approximately 1,000 feet north of Beal Road), on the east by extensions of Cuff Road and
Memphis Avenue, and on the south by Noffsinger and Alcott Roads.
2.2 Purpose of the Service Area Plan
This SAP has been prepared for the County of Imperial in accordance with the Cortese-Knox-
Hertzberg Local Government Reorganization Act of 2000, which requires that a plan identifying
the existing and projected demand for public facilities and services be prepared by all
incorporated cities and special districts within the State. This legislation is implemented by
Imperial County Local Agency Formation Commission (LAFCO), whose policy states that a city
or county within the jurisdiction of Imperial County LAFCO must update an SAP in order to
demonstrate a county’s ability and intent to provide adequate services within its jurisdictional
boundaries.
The Niland Service Area Plan includes the Special District known as a County Service Area
(CSA). California Government Code 56036 (a) defines a Special District or CSA as “an agency
of the state, formed pursuant to general law or special act, for the local performance of
governmental or proprietary functions within limited boundaries. ‘District’ or ‘special district’
includes a county service area”. This CSA was enacted to enable the County to localize the
provision and financing of expanded services, in an area which needed a higher level of public
service. By establishing CSAs, the County of Imperial can identify which areas require a higher
level of specific service than those already uniformly provided within the entire county. These
extended services are financed by the taxpayers of the CSA. By isolating the extra services
provided within the CSA, the County can insure that the additional services are paid for by those
who will receive them.
2.3 Organization and Use of the Service Area Plan
This SAP outlines the Niland CSA existing streetlight facilities, estimates the current and future
anticipated demand for such facilities and services, and describes how necessary facilities and
services will or may be developed and extended to meet demands. The SAP is intended to
demonstrate the County’s intent and ability to provide adequate services to the CSA. An
approximately 10-year planning horizon is used to forecast growth, and the estimated demands
and provision to meet demands. The population projections used in this document was provided
by the Southern California Association of Governments (SCAG). Projected population growth
was placed into the structure and policies of the land use plan presented in the General Plan.
Niland County Service Area No. 1 Service Area Plan Section 2 – Introduction
January 2017 Page 3
The document is organized into the following six chapters that satisfy the requirements set forth
in the LAFCO guidelines:
Chapter 1.0 EXECUTIVE SUMMARY: Provides a brief summary of the SAP,
highlighting key information regarding demand and financing.
Chapter 2.0 INTRODUCTION: Outlines the purpose and intent of the SAP and
presents its layout to help the reader use the document. This chapter also provides
background information on the CSA and of the planning documents that enabled the
preparation of the SAP.
Chapter 3.0 GROWTH PROJECTIONS: Provides general information about
projected population, current and future land use trends in the Niland town site, and the
implications of these trends for the development of Niland’s streetlight services and
facilities.
Chapter 4.0 STREETLIGHT FACILITIES: Details the current and planned streetlight
facilities and services, their current and projected adequacy, measures to ensure
adequacy, and how such measures will be achieved and financed. Analysis for streetlight
facilities in the SAP is based on the standards developed by LAFCO. Although LAFCO
Guidelines typically require evaluation of administration, fire, law enforcement, library,
parks & recreation, and circulation, Niland is a CSA and does not propose annexation
into an adjacent municipality; therefore, the SAP will only analyze streetlight facilities,
which are the only specific public services provided by the County. Each subchapter of
Chapter 4 contains the following four sections:
• Performance Standard: A description of any standards or goals that have been
adopted by the CSA to the review of the adequacy of service within the existing and
future timeframes.
• Facility Planning and Adequacy Analysis: An inventory of the existing streetlight
facilities, the adequacy of the facilities when compared to existing demands, the
anticipated demand for facilities pursuant to growth of the CSA, and the phasing of
the demand for facilities.
• Financing: An explanation and identification of how streetlight facilities are
currently being funded, including a per capita cost where available and applicable and
how future services and facilities may be funded.
• Mitigation: A series of recommendations to ensure that adequate streetlight facilities
will be provided and proper levels of service will be maintained.
Figures are often provided within the various sections of Chapter 4 that show CSA maps
and the relationship of existing and planned facilities to anticipated growth within Niland
CSA boundaries. Figures for each service and facilities area are presented at the end of
each section.
Niland County Service Area No. 1 Service Area Plan Section 2 – Introduction
January 2017 Page 4
Chapter 5.0 FINANCING: Identifies all of the potential funding mechanisms for public
services and facilities provision that are available to the County. This section presents
potential funding sources and then identifies how streetlight facilities are currently
funded and appropriate future funding opportunities, as well as cost saving opportunities.
Niland County Service Area No. 1 Service Area Plan Section 2 – Introduction
January 2017 Page 5
Figure 2-1, Project Vicinity Map
Niland County Service Area No. 1 Service Area Plan Section 2 – Introduction
January 2017 Page 6
SECTION 3 – GROWTH AND PHASING PROJECTIONS
3.1 Existing Land Use
The existing land uses consist primarily of single family homes which include a significant
number of mobile homes on individual lots. Most of the commercial uses are along the west and
east side of State Highway 111 in what is known as "new town." Other commerce and
commercial property is located along Niland Avenue and light industrial property is located to
the north and south of the Union Pacific Railroad tracks. Industrial uses are located to the east of
the town site and consist of the Southern Pacific Tank Farm and associated pipe lines which
parallel the railroad right-of-way. Agricultural activities surrounding the town site continues to
be the dominate land uses in the area.
3.2 Planned Land Use
Land use designations and zoning are not expected to change.
3.3 Projected Population Increase
According to the US Census, the population of the Niland was 681 in 1970, 1,042 in 1980, 1,183
in 1990, and 1,143 in 2000. In 2010, the population of Niland decreased to 1,006, a drop of
nearly 12 percent.
Due to the population decrease, projecting any growth is a challenge, particularly when the
current economic and environmental factors are considered. In the absence of a major
development or economic growth opportunity (i.e. large-scale restoration of the Salton Sea, new
detention facility, new geothermal power plant, etc.), the estimated population in 2025 will be
based on the rate of decrease from 2000 to 2010, a year-to-year average loss of 13.7 persons.
Based on that projected yearly loss of 13.7 persons, the projected population for 2025 is 800.
Table 3-1, Population
Year Population
1970 681
1980 1,042
1990 1,183
2000 1,143
2010 1,006
2025 800
3.4 Theoretical Buildout Projections
Unlike a forecast, the theoretical build-out scenario does not have a time horizon, nor does it
include transportation, demographic, existing land use, or economic assumptions typically used
by a forecasted model to provide more realistic land use planning data. Therefore, due to
regulatory constraints, environmental constraints from the nearby Salton Sea, population
decrease, and foreseeable market conditions, realization of this scenario for the foreseeable
Niland County Service Area No. 1 Service Area Plan Section 3 – Growth and Phasing Projections
January 2017 Page 7
future is highly unlikely.
Figure 3-1, Niland Photo
Abandoned structure and vacant lots on E 1st Street, facing north west.
Niland County Service Area No. 1 Service Area Plan Section 3 – Growth and Phasing Projections
January 2017 Page 8
SECTION 4 – STREETLIGHT FACILITIES
I. Performance Standard
The existing street light standard by Imperial County Publics Works Department (Appendix
A) includes details for a pole with fixture, pole base, pole foundation, and conduit trench. The
standard specifies a 30 foot high minimum steel pole with 15 foot long arm and 250 watt high
pressure sodium fixtures for intersections and 100 watt high pressure sodium fixtures at other
locations.
Mounting heights in excess of 25 feet are not recommended for most residential roadway
applications. Location guidelines for the lights are not indicated.
Specific design standards include the following:
Minimum of one light shall be installed at each roadway intersection and at the end of
cul-de-sac. Provide two at each intersection with roadway exceeding 40 feet wide.
Use 70-watt, high pressure sodium fixture mounted at a maximum mounting height of 25
feet for residential local roadways.
Use 100-watt high pressure sodium fixture mounted at a maximum mounting height of 25
feet for residential collector roadways.
Use 250 watt high pressure sodium fixture mounted at a maximum mounting height of 30
feet for intermediate collector roadway and business highway.
Fixture head shall be a Cobrahead type with full cutoff Type II distribution. Fixtures shall
have separate filtered optic compartment equal to GE Lighting M-250A2 luminaire with
photocell control.
Arm shall be 12 feet for 25 feet high mounting height and 15 feet for 30 feet high
mounting. The orientation shall be perpendicular to the major flow roadway.
Allow the use of existing wood utility poles for new street lighting where feasible.
II. Facility Planning and Adequacy Analysis
Inventory of Existing and Approved Facilities
Highway 111
Highway 111 lights are 250 watt, high pressure sodium, Cobrahead type fixtures, mounted at
approximately 25 feet high on wood poles with a few exceptions. The lights between 1st Street
and Main Street, in front of active business properties are mounted on steel poles at
approximately 30 feet high. Arm orientation is perpendicular to the roadway; light spacing in
one per intersection. Intersection spacing is approximately 400 feet. The lights for the active
business area are spaced at approximately 200 feet. All lights are operational and appear to be in
good condition. These lights are maintained by Caltrans.
Niland County Service Area No. 1 Service Area Plan Section 4 – Streetlight Facilities
January 2017 Page 9
Niland Avenue
Niland Avenue lights are 100 watt, high pressure sodium, Cobrahead type fixtures, mounted
at approximately 25 feet high on wood poles. Arm orientation is perpendicular to the roadway;
light spacing is primarily two per intersection (one on either side of the intersecting roadway),
except for a few intersections that have only one light. Niland Avenue runs diagonally at
approximately 50 degrees relative to the other streets and the resulting intersection spacing is
approximately 500 feet. Most of the lights are very dirty or have broken diffusers.
Main Street
Main Street lights are 100 watt, high pressure sodium, Cobrahead type fixtures, mounted at
approximately 25 feet high on wood poles. Arm orientation is at 45 degrees to the roadway
(pointing from comer towards center of intersection); light spacing is primarily one per
intersection. Intersection spacing is approximately 400 feet. Most of the lights are very dirty
or have broken diffusers.
Remaining Residential Streets
The rest of the street lights are mostly 70 watt, high pressure sodium, acorn or Cobrahead
type fixtures, mounted at approximately 25 feet high on wood poles. Arm orientation is at 45
degrees to the roadway (pointing from comer towards center of intersection); light spacing is
primarily one per intersection. Intersection spacing is approximately 400 feet north-south, and
650 feet east-west. Most of the lights are very dirty or have broken diffusers.
Figure 4-1, Streetlight Photo
Existing streetlight located along Main Street
Niland County Service Area No. 1 Service Area Plan Section 4 – Streetlight Facilities
January 2017 Page 10
Figure 4-2, Streetlight Photo 2
Existing streetlight located on Highway 111
Adequacy of Existing Facilities
The existing lighting along Highway 111 is in good condition and appears to provide adequate
illumination.
The rest of the system has several deficiencies. Most of the existing lights have dirt buildup
on the inside of the diffuser, a broken diffuser, or are non-operational.
The dirty condition is likely due to inadequate maintenance or inadequate fixture
specification for the dusty environment at Niland. The fixtures can be cleaned periodically as a
remedy; however, if the fixture requires cleaning more often than re-lamping, this may not be
an economical solution. Another potential solution is to replace the fixture with one that has
filtered optics.
The broken diffuser conditions are likely the result of vandalism. All of the existing fixtures
have non-cutoff optics and produces a high level of glare and light trespass on residences. We
believe glare conditions contribute to vandalism tendencies.
The acorn style fixtures are typically located at intersections and are mounted at 45 degrees to
the roadway direction. Although this is a good mounting and direction for the acorn style
Niland County Service Area No. 1 Service Area Plan Section 4 – Streetlight Facilities
January 2017 Page 11
fixture, since its light distribution pattern is round, the fixtures are by nature "glare bombs".
Several installations of Cobrahead fixtures are also installed on 45 degree mounting arms. The
Cobrahead fixture is better applied mounted at 90 degrees to the roadway direction since its
light distribution pattern is rectangular. Mounting these fixtures at 45 degrees produces a
significant amount of light trespass onto residences.
The glare problem, and possibly the vandalism potential could be reduced by replacing the
existing fixtures with full cutoff distribution fixtures. The replacement fixtures should be
mounted on arms that are oriented 90 degrees to the roadway direction.
As of January 2017, the Public Works Department is drafting a Request for Proposals to
assess the entire lighting system to make recommendations and provide a rate study for a
release in the summer of 2017. The goal is to determine a new rate to implement and maintain
any recommended upgrades for review by the County Board of Supervisors.
Future Demand for Facilities
With no planned development for the town site and a decreasing population, any future demand
should be based on any new plans for development.
Opportunities for Shared Facilities
There are currently no opportunities for shared facilities.
Phasing
Street lights will be constructed as frontage improvements for developments along the major
streets occur. Given the decrease in population, this scenario is unlikely.
Repairs to existing deficient streetlight infrastructure should be prioritized on major-traveled
corridors such as Highway 111 and Main Street.
III. Mitigation
The existing standard is deficient and needs to be updated. The recommended revisions include
the following:
Minimum of one light shall be installed at each roadway intersection and at the end of
cul-de-sac. Provide two at each intersection with roadway exceeding 40 feet wide.
Use 70-watt, high pressure sodium fixture mounted at a maximum mounting height of 25
feet for residential local roadways.
Use 100-watt high pressure sodium fixture mounted at a maximum mounting height of 25
feet for residential collector roadways.
Use 250 watt high pressure sodium fixture mounted at a maximum mounting height of 30
feet for intermediate collector roadway and business highway.
Niland County Service Area No. 1 Service Area Plan Section 4 – Streetlight Facilities
January 2017 Page 12
Fixture head shall be a Cobrahead type with full cutoff Type II distribution. Fixtures shall
have separate filtered optic compartment equal to GE Lighting M-250A2 luminaire with
photocell control.
Arm shall be 12 feet for 25 feet high mounting height and 15 feet for 30 feet high
mounting. The orientation shall be perpendicular to the major flow roadway.
Allow the use of existing wood utility poles for new street lighting where feasible.
The existing fixtures are in poor shape due to dirt accumulation and vandalism. It is
recommended that the fixtures be replaced with full-cutoff distribution cobrahead fixtures per the
proposed revised standard. In addition, a new pole and light should be installed at the
intersection of 6th and Commercial.
IV. Financing
Current Funding
The Imperial County Board of Supervisors reauthorized the unit assessment in the amount of $14
for the Niland CSA streetlights in 2016, as it has every year since 1989.5 The total revenue
generated by the unit fee varies from year to year. The County’s budgets for fiscal years 2014–
2015, 2015–2016, and 2016–2017 indicate assessment revenues of $13,200, $19,000 (actual,
estimated) and $16,000 (recommended), respectively. Since the unit fee is constant and applied
to the property tax bill of every parcel in the CSA, the variability must be due to delinquencies in
any one year followed by payment in subsequent years of the taxes and assessments that are in
arrears. Based on the average assessment revenues, the number of taxable parcels in the CSA is
approximately 1,150. If 10% of the property owners are delinquent in any year, the delinquency
would account for a $1,600 shortfall in that year.
Cost Avoidance Opportunities
As indicated above in subsection II, Facility Planning and Adequacy Analysis, the general
condition of the streetlights needs improvement and the streetlights would benefit from an
increased level of maintenance. The CSA’s revenue versus expense net surplus of $11,600 this
year, $6,100 last year, and $9,400 the year prior indicate that the maintenance level could be
enhanced and still remain within the CSA’s budget. The County currently pays the Imperial
Irrigation District (IID), the owner of the streetlights, to maintain the system. With the goal of
improving the overall level of maintenance, the County should explore the possibility of
negotiating a service agreement with IID that would establish performance and monitoring
standards. The enhanced maintenance could be funded by the apparent surplus. Consideration
should also be given to a program of changing out fixtures to LED to save on replacements and
electric bills. This would also have the added affected of decreasing light trespass and reducing
costs to the County from vandalism and improving public safety.
Recommended Funding
No specific recommendations for further funding.
5 County Board of Supervisor’s Resolution 2016-105
Niland County Service Area No. 1 Service Area Plan Section 4 – Streetlight Facilities
January 2017 Page 13
This Page Intentionally Left Blank.
Niland County Service Area No. 1 Service Area Plan Section 4 – Streetlight Facilities
January 2017 Page 14
Figure 4-3, Streetlight Location Map
Niland County Service Area No. 1 Service Area Plan Section 4.1 – Streetlight Facilities
January 2017 Page 15
This Page Intentionally Left Blank.
Niland County Service Area No. 1 Service Area Plan Section 4.1 – Streetlight Facilities
January 2017 Page 16
SECTION 5 – FINANCING
5.1 Introduction
This section of the Service Area Plan discusses various financing mechanisms available to the
Niland CSA for maintenance and operation of the streetlights.
5.2 Existing Revenue Sources
The unit fee assessment discussed above is the only revenue source in the Niland CSA applicable
to streetlight installation, maintenance, and operations.
5.3 Future Revenue Sources
Updated Unit Fees
As discussed under the Financing Summary subheading, a property owner vote is the only means
of updating the current unit fee. An increase in the unit fee is not automatic even with a vote for
approval, since the assessment levy may not exceed the actual cost of providing the service in
any year.
5.4 Existing Financing Mechanism
No financing is currently used by the Niland CSA No. 1.
5.5 Future Financing Mechanisms
If the recent net surpluses of the Niland street lighting operations are typical, there is the
potential for some of the surplus to be used as debt service for loans from the County General
Fund or through the Imperial County Community and Economic Development Department,
which works with communities to secure financing for street improvements and public services,
among other projects.
Niland County Service Area No. 1 Service Area Plan Section 5 – Financing
January 2017 Page 17
This Page Intentionally Left Blank.
Niland County Service Area No. 1 Service Area Plan Section 5 – Financing
January 2017 Page 18
Appendix A – Niland Streetlight Master Plan (May 2006)