Heber Public Utility District Service Area Plan

Local Agency Formation Commissions · imperial-msr-2017-heber-public-utility-district-service-area-plan · Msr · 2017-01-01

Read the report at Local Agency Formation Commissions ↗

Heber Public Utility District 2017 Service Area Plan The Holt Group PHONE (760) 337-3883 FAX (760) 337-5997 1601 N. Imperial Ave, El Centro, CA 92243 Table of Contents Section Page 1.0 EXECUTIVE SUMMARY 1 1.1 Introduction and Purpose of the Municipal Service Review/Service Area Plan 1 1.2 Public Facility Analysis Summary 1 2.0 INTRODUCTION & PURPOSE 9 2.1 Purpose of the Service Area Plan 9 2.2 Background on Heber and the Heber Public Utility District 10 2.3 Public Facilities and Services Provided 16 2.4 General Outlook on Population Growth 16 2.5 Disadvantaged Communities 17 2.6 Organization of the Service Area Plan and Contents 17 3.0 GROWTH AND PHASING PROJECTIONS 19 3.1 Existing Land Use 19 3.2 Planned Land Uses 23 3.3 Projected Population Increase 27 3.4 Areas Located within the District Not Fully Developed 27 4.0 PUBLIC FACILITIES AND SERVICES 33 4.1 Services Provided by the Heber Public Utility District 33 Administrative Facilities 34 Parks and Recreation Facilities 38 Wastewater Treatment and Collection Facilities 44 Water Treatment and Distribution Facilities 60 Solid Waste Services and Facilities 69 4.2 Services Provided by Imperial County 71 Fire Facilities 73 Law Enforcement Facilities 77 Library Facilities 81 Transportation Facilities 84 Drainage Facilities 96 4.3 Services Provided by Others 102 Lighting Facilities 103 School Facilities 107 5.0 Financing Plan 113 5.1 Introduction 113 5.2 Existing Revenue Sources 113 5.3 Potential Revenue Sources 115 5.4 Facility Financing 119 Exhibits Exhibits Page Exhibit 1-A Heber Townsite Regional Location Map 11 Exhibit 1-B Existing Heber Public Utility District Boundary 13 Exhibit 1-C Heber Public Utility District Sphere of Influence 14 Exhibit 3-A Heber Urban Area Map Imperial County Land Use Element 20 Exhibit 3-B Imperial County Zoning Map 22 Exhibit 3-C Planned Developments within Heber Public Utility District SOI 26 Exhibit 3-D Phasing of Planned Developments Pending Within Heber’s SOI 32 Exhibit 4-A Layout of the Heber Essential Services Building 35 Exhibit 4-B Park and Recreational Facilities Map 40 Exhibit 4-C Existing Wastewater Collection and Sewer Facility Schematic Map 50 Exhibit 4-D Main Collector & Pump Station Wastewater Schematic Map 53 Exhibit 4-E Wastewater Treatment Plant General Design Criteria/Plant Flow Diagram 55 Exhibit 4-F Existing Water Distribution System 64 Exhibit 4-G Proposed Water Treatment Plant Improvements 66 Exhibit 4-H Imperial County Fire Station Location and Service Area 74 Exhibit 4-I Heber Public Utility District Law Enforcement Facilities Location Map 79 Exhibit 4-J Heber Public Utility District Street Classification Map 88 Exhibit 4-K Heber Public Utility District Sidewalk Location Map 90 Exhibit 4-L Heber Public Utility District Drainage Facilities Map 98 Exhibit 4-M Street Lighting System in Heber 104 Exhibit 4-N Heber Public Utility District School Facilities Map 108 Figures Figures Page Figure 1-A Historic Population Growth 15 Figure 3-B Future Population Growth 28 Tables Tables Page Administrative Facilities Findings 2 Parks and Recreation Facilities Findings 3 Wastewater Treatment System Findings 4 Water Treatment System Findings 5 Solid Waste Services and Facilities Findings 6 Table 3-A Planned Projects to be Serviced by HPUD 24 Table 3-B Available Undeveloped Residential Within HPUD 29 Table 3-C Available Undeveloped Non-Residential Within HPUD 30 Table 3-D Imperial Center Proposed Commercial Land Uses 31 Table 3-E Population Projections for Heber Public Utility District 31 Table 4-A Existing Parks in Heber 38 Table 4-B Shared Retention Basin/Park Space 41 Table 4-C Wastewater Pipeline General Design Criteria 45 Table 4-D Sanitary Sewer Pump Station List 51 Table 4-E Wastewater Demand Based on Historic Growth Rate 57 Table 4-F Wastewater Buildout Demand 58 Table 4-G Water Flow Standards 61 Table 4-H Buildout Demand for Water Treatment Plant 67 Table 4-I Roadway Performance Standard 84 Table 4-J Imperial County Standards per Street Classification 85 Table 4-K Future Roadway Classification and Projected Traffic Volumes 93 Table 4-L Stormwater Retention Basins Within HPUD 97 Table 4-M Proposed Stormwater Retention Basins within HPUD 99 Table 4-N Shared Retention Basin/Park Space 100 Table 4-O Total Projected Student Population at Heber Elementary School District 111 Table 5-A Administration Resources 120 Table 5-B Sewer Fees 121 Table 5-C Water Fees 122 Table 5-D Park Funding Revenues 123 Page List of References 1 26 List of Persons and Agencies Contacted 1 27 Appendices Appendix A Pavement Management Analysis Appendix B Imperial Center Specific Plan Appendix C Financial Statement Heber Public Utility District Service Area Plan Executive Summary January 2018 1.0 EXECUTIVE SUMMARY 1.1 INTRODUCTION AND PURPOSE OF THE MUNICIPAL SERVICE REVIEW/SERVICE AREA PLAN In 1997, Assembly Bill (AB) 1484 established the Commission of Local Governance for the 21st Century. The role of the Commission of Local Governance was to evaluate local government organization and operational issues and develop a statewide vision and determine how the State should grow. Within this framework, the Local Governance Commission concluded that Local Agency Formation Commission’s (LAFCO’s) powers should be expanded and be a participant in regional growth and planning forums. Further, the Local Governance Commission recommended that State law be amended to require that “spheres of influence” be regularly updated and that LAFCO’s initiate periodic regional municipal service reviews, also known as service area plans, to ensure the efficient provision of governmental services. A sphere of influence is defined by law as a “…plan for the probable physical boundaries and service area of a local agency, as determined by the commission” (GC 56076). As a result of the Local Governance Commission’s recommendations, on September 26, 2000, Governor Gray Davis signed into law AB 2838, titled the Cortese-Knox-Hertzberg Local Government Reorganization Act. The Cortese-Knox-Hertzberg Act requires each LAFCO to review and update as necessary the spheres of influence for all applicable agencies within each County. In Imperial County, service area plans are recommended to be updated every five years in order to be in compliance (Governor’s Office of Planning and Research, LAFCO Municipal Service Review Guidelines, p.10 2003.) This Service Area Plan is an update from HPUD’s last adopted Service Area Plan in 2012. 1.2 PUBLIC FACILITY ANALYSIS SUMMARY This section provides an overview of findings for both facilities serviced by the Heber Public Utility District and other public agencies. Facilities and services reviewed under this Service Area Plan are as follows: Administrative Facilities, Wastewater Treatment Plant and Wastewater Collection System, Water Treatment Plant and Water Distribution System, Parks and Recreation Facilities, Fire Facilities, Law Enforcement Facilities, Library Facilities, Transportation Facilities, Drainage Facilities and School Facilities. 1.2.1 Services Provided by the Heber Public Utility District This section summarizes the findings for services provided by the Heber Public Utility District but may also include coordination with other agencies who extend similar services. The findings are based on information obtained from existing reports such as Preliminary Engineering Reports (PER’s), infrastructure studies, Specific Plans, adopted budgets, and discussions with District Staff. Also incorporated is reference to the 2011 Imperial County Municipal Service Review. Page | 1 Heber Public Utility District Service Area Plan Executive Summary January 2018 1.2.1.1 Administrative Facilities Summary Findings Administrative services for the Heber community are provided in part by the Heber Public Utility District and in part by Imperial County. The Heber Public Utility District provides administrative services incidental to Wastewater, Water Treatment and Parks and Recreation services as well as some lighting and drainage facilities. The HPUD Administrative Offices lease space in the “Heber Essential Services Building” owned by Imperial County. The building is less than fifteen years old and adequate to meet the demands of HPUD through 2040. HPUD is considering the option to acquire and/or construct independent facilities as it continues to grow in order to better serve the Heber community with additional ancillary services. A strategic facility plan should be adopted to define a two- to five-year plan identifying an entire portfolio of District owned and/or leased space that sets strategic facility goals based on the Districts objectives. The following table summarizes the findings for administrative facilities. Administrative Facilities Findings Performance Standard None Applied Existing Facilities 1,300 square feet reserved for offices & administrative functions. Existing Demand 0.71 employee per 1,000 population and 260 square feet per employee Adequacy The administrative offices for District Staff are adequate for current personnel. Future Demand No additional facilities warranted through 2020. Mitigation A-1 The HPUD shall prepare a Facility Plan that analyzes the number of personnel required to service future population and the amount of space required for the number of employees. The Facility Plan shall include a cost-benefit analysis comparing options for continuing to lease, relocation, acquisition, or new construction of Administrative Building. A-2 The HPUD shall continue to ensure that its current impact fees consider the capital costs of any new administrative facilities. Funding Sources Current: Imperial County, HPUD Water Fund and Wastewater Fund, Miscellaneous Revenues Future: HPUD Water Fund and Wastewater Fund Annual Budget FY 17/18 Approximately $23,000 (2017) Cost Per Capita $3.30 Page | 2 Heber Public Utility District Service Area Plan Executive Summary January 2018 1.2.1.2 Parks and Recreation Facilities Summary Findings As an unincorporated community, parks and recreation facilities would typically be under the purview of the County of Imperial, but HPUD and the County have entered into various service agreements whereby HPUD is responsible for operation and maintenance of certain park facilities. The Heber community has four (4) improved parks and the HPUD owns three of them. The following table summarizes the findings for parks and recreation facilities. Parks and Recreation Facilities Findings Performance Standard 5 acres per 1,000 in population Existing Facilities 21.53 acres of parkland Existing Demand 34.89 acres (based on population of 6,979) Adequacy Imperial County, and thus the District, are currently not meeting the performance standard ratio of 5 acres for 1,000 in population and are deficient 13.36 acres. Future Demand By 2040: 65 acres (12,922 population at 2.7% growth) Mitigation P-1 As new development is proposed, the District shall coordinate with Imperial County to ensure that projects are required to incorporate park space per the performance standard of five (5) acres per 1,000 in population. P-2 The District shall seek grant opportunities to improve existing park space with lighting and necessary amenities. P-3 The District shall pursue grant resources to develop land currently owned by the District for recreational use as long as there are identified resources for the continued operation and maintenance of any new facilities. P-4 The District shall determine whether to dedicate the 19 acres of land they own off of Rockwood for a regional park and how the operation and maintenance costs with Imperial County would be acceptable. Funding Sources Current: Property taxes, CFD’s, LMD’s, user fees Future: Property taxes, CFD’s, LMD’s, user fees and Grants. Annual Budget Approximately $614,000 (2017) Cost Per Capita $88.22 Page | 3 Heber Public Utility District Service Area Plan Executive Summary January 2018 1.2.1.3 Wastewater Treatment & Collection Facilities Summary Findings The HPUD owns, operates and maintains a Wastewater Treatment System which provides services to the Heber community, and areas immediately outside of the District boundary, but within the Sphere of Influence. The sewer treatment plant has a current design and permitted capacity of 1.2 MGD. The average daily flow received at the Heber Public Utility District Wastewater Plant in 2016 and 2017 was approximately 0.46 million gallons per day with peak flows no greater than 0.61 million gallons per day, according to Plant Operators. Thus, the WWTP is operating at less than 50 percent of capacity. Based on Heber’s historic population growth rate of 2.71%, the treatment plant will be at 100% capacity sometime prior to 2040. The following table summarizes the findings for wastewater treatment and collection facilities. Wastewater Treatment System Findings Performance Standard Must meet or exceed peak demand and meet effluent discharge requirement of the RWQCB. Existing Facilities Treatment Capacity: 1.2 MGD Existing Demand Average Annual Demand up to 0.6 MGD (2006) & 0.5 MGD (2017) Adequacy Adequate (At Less Than 50% of Capacity) Future Demand 2020 0.75 MGD (at 2.7% growth rate) 2030 0.99 MGD 2040 1.29 MGD Mitigation S-1 The District should continue to pursue various means by which to obtain funding and provide for adequate wastewater collection/conveyance facilities. S-2 New Development shall continue to be held responsible for constructing adequate wastewater facilities and/or contributing fair share costs. S-3 The District shall ensure that a Service Agreement be in place, prior to the annexation of new development and that any “Will-Serve” letters have an expiration date if no service connections are made. S-4 The District shall develop a Master Plan for the continued improvements of its Wastewater Treatment and Collection facilities. Funding Sources Current: Wastewater Fund and grant resources. Future: Wastewater Fund and grant resources. Annual Budget Approximately $1,350,000 (2017) Cost Per Capita $193.44 Page | 4 Heber Public Utility District Service Area Plan Executive Summary January 2018 1.2.1.4 Water Treatment & Distribution Facilities Summary Findings The District currently owns a Water Treatment Plant system with a water treatment plant capacity of 4.0 million gallons per day (MGD) which was recently constructed in 2017. The average daily demand to the Water Treatment Plant in 2016 was 1.136 million gallons/day, marginally higher than 2017. The maximum demand under both years was 1.7 million gallons/day. The current average daily demand of 1.12 is 28% of the system capacity. If development occurs at the same pace it has in the past seven years, the water treatment plant would be at 58% capacity in 2040. The following table summarizes the findings for water treatment and distribution facilities. Water Treatment System Findings Performance Standard Require minimum flow, pressure, and storage requirements, and minimum quality standards established by the California Department of Public Health (CDPH). Existing Facilities Treatment Capacity: 4.0 MGD Storage Capacity: 7.3 MGD Existing Demand 2017 Average Daily Flows: 1.12 MG 2017 Maximum Demand: 1.72 MG Adequacy Adequate (At Less Than 50% of Capacity) Future Demand 2020 1.5 MGD (at 2.7% growth rate) 2030 1.9 MGD 2040 2.3 MGD Mitigation W-1 The HPUD should continue to pursue various means by which to obtain funding. W-2 The District should develop a Master Plan to adequately program capital improvement needs in its aging distribution system. W-3 The District shall ensure that a Service Agreement be in place, prior to the annexation of new development and that any “Will-Serve” letters have an expiration date if no service connections are actually made. Funding Sources Current: Water Fund, grant and loan resources. Future: Water Fund and grant resources. Annual Budget Approximately $1,746,000 (2017) Cost Per Capita $250.18 Page | 5 Heber Public Utility District Service Area Plan Executive Summary January 2018 1.2.1.5 Solid Waste Service & Facilities Summary Findings The Heber Public Utility District outsources solid waste services to CR&R Incorporated for the collection, transportation, recycling and disposal of solid waste, recyclable and compostable materials. The current agreement expires in 2024. CR&R disposes of collected solid waste at the Imperial Allied Waste Landfill, a privately-owned landfill, located at 104 East Robinson Road, within an unincorporated area, east of the City of Imperial. The landfill was recently expanded and has a disposal acreage of 162 acres and an expected closure date of December 31, 2040. The following table summarizes the findings for solid waste service and facilities. Solid Waste Services and Facilities Findings Performance Standard Customer Service Performance Standards under contract Existing Facilities Allied Waste Landfill and other landfills located throughout Imperial County Existing Demand Existing demand is 2,788 tons annually. Adequacy Services are being provided adequately Future Demand No additional facilities warranted through 2030 Mitigation No mitigation necessary during this planning period Funding Sources User fees and administrative fees. Annual Budget $512,000 ($45,000 Franchise Fee) Cost Per Capita $73.36 1.2.2 Services Provided by Imperial County This section provides an overview of findings for the following facilities and services administered, financed, and implemented by Imperial County, in whole or in part: Fire Facilities, Law Enforcement, Library Facilities, and Transportation Facilities. The findings for each of these sections and the discussion in Section 5.2 – Services Provided by Imperial County are based on the Draft Municipal Service Review prepared for the County of Imperial by Hofman Planning and Engineering.1 1 Although the Imperial County Municipal Service Review has been under review by Imperial County since January 2011, as of June 2012, Imperial County has not commented on the document. As such, the Municipal Service Review has not been approved by LAFCO. Page | 6 Heber Public Utility District Service Area Plan Executive Summary January 2018 1.2.2.1 Fire Protection Facilities Findings The most recently adopted Service Area Plan (2011) for Imperial County identified the existing fire facilities as adequate. The current Heber Fire Station was found to meet all the current code requirements, and according to the Fire Chief of the County of Imperial, the existing staffing levels are sufficient based on the current demands and average response times. 1.2.2.2 Law Enforcement Facility Findings The Sheriff’s Office headquarters is located approximately 3.4 miles from the community of Heber and can meet its current response time standard of 8 minutes. However, there is a deficit of 10 patrol deputies. Based on input from the Sheriff’s Office, the staffing shortage should be addressed by hiring 6 deputies and 2 sergeants (County of Imperial Municipal Service Review Draft #3, 2011). 1.2.2.3 Library Facilities Findings The library services moved from the Essentials Building to the new Community Center at 1132 Heber Avenue. The current library service levels for the Heber population are currently substandard given the current population. The library station operates a limited number of hours thus restricting accessibility to the community. 1.2.2.4 Transportation Facilities Findings Per the Imperial County Circulation Element, updated in 2008, all roadways within the Heber Sphere of Influence are operating at a Level of Service C or better, with the exception of Dogwood Road between Heber Road to Jasper Road which had a Level of Service D. Facilities for pedestrians are also found to be non-existent or substandard and this SAP details the findings under the respective section. 1.2.2.5 Drainage Facilities Findings Drainage facilities are typically along public streets and right-of-way in the form of surface flow curb and gutter or stormwater catch basins and underground stormwater pipelines within the street and roadway system. There are several areas within the Heber Townsite that hold stagnant water during and after storm events. Deficiencies are primarily due to lack of surface storm water carriers or any comprehensive regional storm water collection system. 1.2.3 Services Provided by Others This section discusses findings for services not provided by the Heber Public Utility District or the County of Imperial. The findings are based on information provided by the Imperial Irrigation District for drainage facilities and the Heber Elementary School District for education services. Page | 7 Heber Public Utility District Service Area Plan Executive Summary January 2018 1.2.3.1 Lighting Facilities Findings The existing lighting facilities are adequate to serve the community as long as they remain in service. As development occurs, developers will be required to expand lighting facilities into all new development. 1.2.3.2 School Facilities Findings The existing Heber Unified School District facilities are adequate to meet the educational needs of the current population. However, the two elementary schools only have an excess capacity of 17 students. Additional mobile classrooms can be added to each school as an interim measure, but new campuses will have to be built prior to the end of the planning period. McCabe Union Elementary School District will be affected once the later phases of McCabe Ranch II Specific Plan Area are developed which will likely not occur within the planning period. Based on historic population growth rate of 2.71%, an additional 515 new high school- aged students will be attending Southwest High School. Page | 8 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 2.0 INTRODUCTION & PURPOSE The Imperial County Local Agency formation Commission (IC LAFCO) is charged with the review and approval of the Heber Service Area Plan. The Imperial County LAFCO is comprised of two County Supervisors appointed by the Board of Supervisors, two City Council members appointed by the City Selection Committee and one public member approved by LAFCO, for a total of five members. LAFCO has the authority to review, approve or deny boundary changes, city annexations, consolidations, special district formations, incorporations for cities and special districts, and to establish local spheres of influence. 2.1 PURPOSE OF THE SERVICE AREA PLAN The Service Area Plan is intended to assess current service demands and future service needs within the HPUD’s sphere of influence, and demonstrate that future public facilities, for the provision of services, have been identified in accordance with the Cortese-Knox- Hertzberg Act. Service area plans provide each LAFCO with a tool to comprehensively study existing and future public service conditions and to evaluate organizational options for accommodating growth, preventing urban sprawl, preserving open space and prime agricultural lands, and efficiently extending government services. 2.1.1 Requirements of a Service Area Plan The requirements of the contents of a service area plan are determined by the State’s Government Code. Per Government Code Section 56430, LAFCO shall prepare a written statement of its determinations with respect to each of the following: 1. Growth and population projections for the affected area; 2. The location and characteristics of any disadvantaged unincorporated communities within or contiguous to the sphere of influence. 3. Present and planned capacity of public facilities, adequacy of public services, and infrastructure needs or deficiencies including needs or deficiencies related to sewers, municipal and industrial water, and structural fire protection in any disadvantaged, unincorporated communities within or contiguous to the sphere of influence. 4. Financial ability of agencies to provide services. 5. Status of, and opportunities for, shared facilities. 6. Accountability for community service needs, including governmental structure and operational efficiencies. Page | 9 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 7. Any other matter related to effective or efficient service delivery, as required by commission policy. 2.2 BACKGROUND ON HEBER AND THE HEBER PUBLIC UTILITY DISTRICT The Townsite of Heber is a small community uniquely situated between the two most populated cities within Imperial County: El Centro and Calexico. Heber is an unincorporated area within Imperial County and partially serviced by the County of Imperial and other public entities, including the Heber Elementary school district and other public utility and service districts. The Heber Public Utility District was formed in 1931 under the Public Utility Act of 1921 for the specific purpose of providing wastewater and water services to the Heber community. Services provided by the HPUD have since expanded to include parks and recreation and limited drainage and lighting facilities. The Heber Public Utility District office is located at 1078 Dogwood Road, Suite 103 in Heber and serves a constituency of 1,707 persons (Imperial County Elections Office, July 2011)2. The Heber Public Utility District provides limited public services to the Heber community consisting of water, wastewater and parks and recreation services. The Heber Public Utility District consists of a five-member Board of Directors elected by the public. A General Manager reports directly to the Board of Directors and is charged with overseeing the District’s operation and employees. The District also has a legal counsel that reports to the Board of Directors and the General Manager. The District currently operates with 14 employees and had a 2010/2011 fiscal year budget of approximately $16 million (Resolution 2010-08). Geographic Location of Heber The Townsite of Heber is uniquely situated between the two most populated cities within Imperial County: El Centro and Calexico. Heber’s developed area covers approximately 1.63 square miles and is accessed from the east via Highway 111, a primary north/south transportation corridor. Highway 111 provides regional transportation services and connects the major jurisdictions in Imperial County. El Centro and Calexico are located one mile north and one mile south from the townsite, respectively. Heber is located approximately 7 miles north from the U.S./Mexico border and Calexico Port of Entry. (Refer to Exhibit 1-A – Regional Location Map). 2 Number of Registered Voters Within the Heber Public Utility District per Imperial County Elections Office on July 25, 2011 at 1:43 PM. Page | 10 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 Page | 11 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 Official District Boundary The legal Heber Public Utility District Boundary is uniquely shaped and may be generally described as bound by Correll Road to the north, (inclusive of 79 acres located at the northwest corner of Correll Road and Dogwood Road), extending south to Jasper Road, Pitzer Road to the east, and reaching what would be an extension of Farnsworth Road to the west. (Refer to Exhibit 1-B – Heber Public Utility District Boundary). The Heber Public Utility District boundary was last modified on June 8, 2012 as LAFCO approved a boundary to accommodate the Imperial Center, a wholesale/retail shopping center that includes a number of land uses including, a large central wholesale center and a series of “out” parcels that will be developed along Highway 111 (LAFCO Staff Report, November 19, 2010). Annexing Land Into District Boundary In order for land to be annexed into HPUD’s District Boundary, a LAFCO Annexation Application shall be submitted and all applicable LAFCO fees shall be paid. After the Application is deemed complete by LAFCO, LAFCO analyzes the proposed annexation in light of the commission's State mandated evaluation criteria and responsibilities and its own adopted policies. LAFCO then makes a decision on the annexation with or without conditions of approval. According to LAFCO policies, the boundaries of the District may be altered and unincorporated, contiguous or noncontiguous territory of at least 10 privately owned acres lying within three miles of the closest District boundary may be annexed to the District (Public Utilities Code Sections 17301, 17362). Heber District Sphere of Influence The Sphere of Influence for Heber is a much broader area intended to accommodate future growth. Growth within the Sphere of Influence is planned for and taken into account under the Service Area Plan. The delineation of this Sphere of Influence is important to Heber because it defines the primary area within which urban development is to be encouraged and limits up to which areas services should be extended to. The approved Sphere of Influence boundaries are described as McCabe Road to the north, State Highway 86 to the west, Willoughby/Jasper Road to the south and State Highway 111 to the east, inclusive of a small expanded area consisting of approximately 142 acres, east of Highway 111 between Heber Road and Abatti Road, encompassing the Imperial Center (Refer to Exhibit 1-C – Heber Public Utility District Sphere of Influence). Page | 12 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 Page | 13 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 Page | 14 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 Population and Demographics Although Heber is an unincorporated community, it is very similar to the smaller cities in Imperial County as it relates to population. Over the last two decades Heber experienced significant growth and development. From 1990 to 2000, Heber’s population increased from 2,556 persons to 2,988 persons, according to the US Census Bureau. By 2010, Heber’s total population was estimated to be 6,000 based on 1,500 total residential connections multiplied by the average household size of 4 persons per household (1,500 connections x 4 persons per household = 6,000 persons). In 2017, the household size was estimated at 3.91 persons per household according to the American Community Survey and the number of residential connections increased to 1,785 connections for a 2017 population estimate of 6,979. These figures show that the average growth rate for the preceding seven (7) years was 2.71%. According to the California Department of Finance, the Heber community had a higher percentage growth rate than Brawley, El Centro and Holtville. Heber’s recent population growth can be attributed to its central location along some of the busiest transportation corridors in the region: Highway 111 and State Route 86. Figure 1-A Historic Population Growth 8000 6979 7000 5865 6000 n 5000 o it a 4000 3508 lu p 2988 o 2556 P 3000 2000 1000 0 1985 1990 1995 2000 2005 2010 2015 2020 Year Source: US Census/Year 2017 estimate is based on 1,785 residential water connections and American Community Survey (ACS) for Household (HH) Size of 3.91. Another significant factor contributing to the population growth may be attributed to population demographics. Over 97 percent of the Heber population is Latino. Culturally, Latinos tend to share households with extended family members. Heber’s average household size of 3.91 persons per household is significantly larger than the County’s 3.34 Page | 15 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 persons per household or the State’s average at 2.90 persons per household (US Census, 2010). These statistics are important in determining the service needs of the population. 2.3 PUBLIC FACILITIES AND SERVICES PROVIDED The Heber Public Utility District provides a limited amount of services including wastewater collection and treatment services, potable water treatment and distribution services, and administrative services to residents within the District’s service area. Solid waste disposal services and limited parks and recreation services are also extended by the HPUD. Given that Heber is located within an unincorporated area of Imperial County, all other public services including law enforcement, fire protection, and roadway maintenance are provided by Imperial County. Additional public service purveyors currently providing services within the HPUD service area include the Heber Unified School District, McCabe School District, and the Imperial Irrigation District. The Heber Public Utility District works closely with the respective entities to ensure that all public services are adequately provided for existing and new development. 2.4 GENERAL OUTLOOK ON POPULATION GROWTH The Heber Public Utility District service area has experienced rapid and significant residential growth during the period from 2000-2010. From 1990 to 2000 the service area’s population growth was 16.9% (Source: Water Treatment Plant Preliminary Engineering Report, 2008). However, from 2000 to 2010, Heber’s population had doubled. As stated earlier, the estimated population was calculated based on the number of residential water connections multiplied by the average household size. Other factors have contributed to this growth. The Townsite of Heber is immediately south, and within 2 miles of the premier development in the Imperial Valley region – the Imperial Valley Mall. Additional high end commercial and business development are planned in the immediate vicinity of the Imperial Valley Mall. There is a vibrant population outlook associated with new development planned within HPUD’s Sphere of Influence. HPUD’s service area, and thus potential growth areas, are comprised of relatively large tracts of vacant, low-priced farmland that has captured the market interest of residential developers. Heber is also near or intersected by several major arterial roadways, including Highway 86, Highway 111, Interstate 8 and Dogwood Road. Highway access makes Heber an attractive location for residential, commercial, and industrial development. As an example, the Imperial Center is a planned commercial development that is expected to significantly contribute to the growth and demand of HPUD services. All of these factors have significantly contributed to Heber’s growth rates and it is expected that the growth trend will continue. At the time of the preparation of the Service Area Plan it was estimated that HPUD could have a population base of 12,922 by the year 2040. These figures and projections highlight the importance of planning services to adequately serve the projected population. Population trends and projections are further discussed under Section 3 Growth and Phasing Projections. Page | 16 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 2.5 DISADVANTAGED COMMUNITIES Government Code Section 56430 requires the identification of location and characteristics of any disadvantaged unincorporated communities within or contiguous to the sphere of influence. The capacity and adequacy of infrastructure, public facilities, and public services must be analyzed for disadvantaged unincorporated communities, which is defined as an area of inhabited territory located within an unincorporated area of a County in which the annual median household income is less than 80 percent of the area median household income. All of Heber is unincorporated and according to data derived from the 2010 Census and the 2015 5-Year American Community Survey, the median household income is $37,156. The median income for Imperial County is $49,700 as calculated by the US Department of Housing and Urban Development. As such, all of Heber is considered a disadvantaged unincorporated community, and there is no separate discussion to examine the needs of disadvantaged communities. 2.6 ORGANIZATION OF THE SERVICE AREA PLAN AND CONTENTS This Service Area Plan discusses the services currently provided by the Heber Public Utility District; estimates the current and future demand for such facilities and services; and describes how necessary facilities and services will be or may be developed or improved on to meet population demands. Additionally, the Service Area Plan discusses services provided by Imperial County and their adequacy based on demand. The intent of the Service Area Plan is to demonstrate the District’s ability to provide adequate services within the sphere of influence boundaries in the event of new development with the District Boundaries or new annexation into the District Boundaries. An approximate 20-year planning period is used to forecast growth and the estimated facility and service demands are based on population projections in five-year increments until 2040. This Service Area Plan document is organized into the following six sections that satisfy the Guidelines adopted by Imperial County’s LAFCO. Section 1.0 – Executive Summary: Provides a brief summary of the Service Area Plan for the Heber Public Utility District and highlights critical information regarding performance standards, existing facilities, demand, mitigation, funding sources, annual budget and cost per capita. Section 2.0 – Introduction: Provides a brief description of the Heber townsite and the Heber Public Utility District as well as the general characteristics of the Service Area Plan. Section 3.0 – Growth and Projections: Provides a discussion on existing and planned land uses in the District and the District’s Sphere of Influence and describes potential impacts associated with population growth and projected service demand. Section 4.0 – Buildout Phasing Projections: Provides a discussion on buildout phasing projections within the 20-year planning period. Page | 17 Heber Public Utility District Service Area Plan Introduction & Purpose January 2018 Section 5.0 – Public Services: Provides a thorough description of current and planned facilities and services, and its current and projected adequacy. An analysis and assessment of public services provided by the District, Imperial County, and any other service purveyor will be addressed. The following facilities and services are reviewed: Administrative Facilities, Wastewater Treatment and Sewer Collection Facilities, Water Treatment and Distribution Facilities, Parks and Recreation Facilities, Fire Facilities, Law Enforcement Facilities, Library Facilities, Transportation Facilities and School Facilities. Section 6.0 – Financing Plan: Identifies and discusses existing and potential sources of revenue and financing mechanisms for public facilities and services available to the District. In addition, this section identifies cost saving opportunities for the District. Page | 18 Heber Public Utility District Service Area Plan Growth & Phasing Projections January 2018 3.0 GROWTH AND PHASING PROJECTIONS It is the intent of the Heber Public Utility District to plan for growth via the orderly development of areas within the HPUD Sphere of Influence. Growth is influenced by location, land use restrictions, existing conditions, and availability of services. Orderly development is accomplished through planned improvements, phasing of service expansions and phasing of development projects. This Section of the Service Area Plan identifies the existing and planned land uses, the intricate development process, and the anticipated population growth which are all critical factors on how HPUD will service the community. 3.1 EXISTING LAND USE Although the District’s service area has grown rapidly in the last decade, it is small in comparison to nearby Cities. For example, the City of El Centro and its sphere of influence area is about 16,000 acres of land (El Centro Service Area Plan, 2005). The City of Calexico and its sphere of influence area is 10,100 acres (Calexico Service Area Plan, 2006). Whereas, the District and its sphere of influence area is only approximately 5,568 acres (Heber WWTP PER p.2-1). It is important to underscore Heber’s uniqueness as a townsite. The townsite of Heber is located within an unincorporated area of Imperial County; therefore, it is not a City and does not dictate land use and zoning policies. Rather, the Heber Public Utility District works closely with Imperial County to ensure orderly planned development. Existing land uses within the District include residential, commercial and light industrial. The predominant land use within the District is residential, including low, medium and high- density housing. Light industrial land uses are located along an operational railroad which bisects the town in a northwest/southwest orientation. General commercial land uses are located along Main Street and along Heber’s newly annexed area at the intersection of Highway 86 and Highway 111. 3.1.1 General Plan Land Use Policy The Heber community and service area land uses are regulated by Imperial County. Imperial County adopted Heber’s Urban Area Map which provides a more in-depth view of the Heber Public Utility District’s land use designation and was last revised in 2004. Designated land uses include a variety of land use designations including: low density residential, medium density residential, high density residential, general commercial, government/special public, and light industrial (Refer to Exhibit 3-A – Heber Urban Area Map). There are also Specific Plan Area designations outside of the Heber Townsite but within the Heber sphere of influence. In order to develop outside of the District boundaries and within the HPUD Sphere of Influence, it is necessary for interested Page | 19 Heber Public Utility District Service Area Plan Growth & Pashing Projections January 2018 Page | 20 Heber Public Utility District Service Area Plan Growth & Pashing Projections January 2018 developers to prepare a specific plan as land use restrictions have not been adopted for urban use. The purpose of the specific plan is the systematic implementation of the general plan for all, or part, of the covered area by the general plan and pre-determines zoning. California Government Code Section 65451 of the Government Code mandates that a specific plan specify all of the following in detail: 1. The distribution, location, and extent of the uses of land, including open space, within the area covered by the plan. 2. The proposed distribution, location, extent and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, energy, and other essential facilities proposed to be located within the area covered by the plan and needed to support the land uses described in the plan. 3. Standards and criteria by which development will proceed, and standards for the conservation, development, and utilization of natural resources, where applicable. The land use designations are amended or updated periodically with the most recent edits occurring in October 2014. Currently there are over 3,436 acres designated as Specific Plan Areas surrounding the Heber Townsite. 3.1.2 Zoning Zoning within the Heber Public Utility District is regulated by Imperial County. The District area has been assigned several zoning designations. The District is best characterized by the preponderance of zoning designations for residential development at various densities which include, R1 (low density residential), R2 (medium density residential), R3 (medium to high density residential), and R4 (high density residential and mobile home parks). Generally, the land that abuts the railroad is zoned M1 for agricultural related light industrial and GS for government land uses. Throughout Main Street/Highway 86 various blocks are designated for C-2 and Medium Commercial. There are also several areas within the Heber District Boundary which are zoned as Specific Plan Areas. These areas are not illustrated. Refer to Exhibit 3-B – Zoning Map. Areas outside of the District Boundaries necessitate the development and adoption of Specific Plans which assign various types of zoning designations, each with respective density and development standards. One of the most recent Specific Plan Areas under Development is the Imperial Center which is adjacent to the Highway 111 and consists of over 77 acres zoned ICC- SPA (Imperial Center Page | 21 Heber Public Utility District Service Area Plan Growth and Phasing Projections January 2018 Page | 22 Heber Public Utility District Service Area Plan Growth and Phasing Projections January 2018 Commercial Specific Plan Area). McCabe Ranch II, also a Specific Plan, was approved by the County Board of Supervisors on August 10, 2010 and incorporates a diverse land use. McCabe Ranch II proposes various types of residential development, commercial areas, two schools and recreational areas. 3.1.3 Development Process The process of development varies depending on the location of the proposed commercial, industrial or residential development. When a developer wants to develop land within the Heber Public Utility District Limits, land use restrictions are already in place and discretionary approval of the project is not necessarily required by the Imperial County Board of Supervisors as long as all development standards are met for the respective land uses. The District provides services to all development within the District limits. However, if the development is to occur outside the legal District boundaries, discretionary approval may be required, and Heber Public Utility District may provide service under certain conditions, one of which may be annexation into the District Boundary. Development outside of the District boundaries and within the HPUD Sphere of Influence, will most likely require for the developer to prepare a Specific Plan. When a Specific Plan is required, California law also requires adoption of implementation measures including regulations, programs, public works projects, and financing measures necessary to carry out the construction of the proposed development. All building permits requested, within and outside of the District boundaries, and within unincorporated areas are processed by the Imperial County Building Department. When an applicant requests a building permit, they are required to complete an application as well as a site plan. The Imperial County Building Department is responsible for ensuring that all requests are completed in compliance with the Uniform Building Code and applicable County codes. Imperial County further imposes Development Impact Fees for all development within the District and the District’s Sphere of Influence. Development Impact Fees vary by land use but average $6,641 per single family home. 3.2 PLANNED LAND USES Within the established Heber Public Utility District Sphere of Influence, there is ample opportunity for land development. Over 417 acres are vacant and undeveloped in addition to the 132 acres already currently under a Specific Plan. The existing sphere of influence boundaries are McCabe Road to the north, Willoughby Road/Jasper Road to the south, Date Drain 3 to the west, and State Highway 111 to the east, with the addition of an area east of Highway 111 between the crossroads of Heber Road and Abatti Road which Page | 23 Heber Public Utility District Service Area Plan Growth and Phasing Projections January 2018 extend further to the east, as previously illustrated by Exhibit 1-C – Heber Public Utility District Sphere of Influence. As previously noted, land use within the Heber Public Utility District is governed by Imperial County’s Zoning Ordinance which is guided by the goals and policies established under Imperial County’s General Plan. It is important to underscore that the Heber Public Utility District does not have land use authority and works closely with Imperial County regarding new development proposals and service considerations to insure planned land uses are consistent with one another. A number of subdivision projects are in various stages of the planning process. These subdivision projects include Tentative Tract Maps and Specific Plans. Specific Plans allow for a more comprehensive approach to land use planning, and unlike Tentative Tract Maps, Specific Plans do not expire. A listing of all proposed and approved projects are shown in Table 3-A. Table 3-A Planned Projects to be Serviced by HPUD Project Proposed Land Uses Status* Approved on 4/10/07 by I.C. Commercial, Public Facilities Board of Supervisors Imperial Center Approximately 14 acres of Specific Plan Area Annexed to HPUD in 2012 commercial left to be developed Residential Commercial, Parks, Approved 8/10/10 by I.C. Board Schools McCabe Ranch II of Supervisors Specific Plan Area Approximately 459 acres remain Pending HPUD Annexation undeveloped Heberwood Estates Residential (approximately 208 Last Tract Map yet to be recorded Tentative Tract Map single family homes) Heber Foundation Residential (multi-family) Uncommitted Heber Meadows Residential (approximately 105 Last Tract Map yet to be recorded Tentative Tract Map single family homes) *Source: Imperial County Planning and Development Services Staff, October 10, 2017 The following is a brief description of the Specific Plan projects in progress as previously identified under Table 3-A – Specific Plans Areas to be Serviced by HPUD: Imperial Center – The Imperial Center was approved by the Imperial County Board of Supervisors on April 10, 2007. The Imperial Center consists of Page | 24 Heber Public Utility District Service Area Plan Growth and Phasing Projections January 2018 commercial development within a 77.64-acre parcel located at the northeast corner of Highway 111 and Heber Road. The anticipated land uses at the Imperial Center would provide a variety of commercial land uses including a wholesale outlet, multiplex cinema, hotel, convenience market, and several pads for additional retail space. McCabe Ranch II – The McCabe Ranch II Specific Plan was approved by the Imperial County Board of Supervisors on August 10, 2011 for the development of approximately 457 acres, including approximately, 2,300 dwelling units, over 11 acres of commercial space, two (2) schools and 51.6 acres of open space. The project would be bordered by McCabe Road to the north, Dogwood Road to the east, State Route 86 on the west, and a western extension of Correll Road to the south. The project is within the Heber Public Utility District’s sphere of influence and would potentially add 9,200 new residents. This project is currently pending annexation and a service agreement with the Heber Public Utility District. It is anticipated that this project will be substantially developed within the twenty to thirty years. Heberwood – Much of Heberwood Estates has been previously built out but a 41- acre portion remains undeveloped. The County of Imperial Board of Supervisors recently approved a time extension on the life of the Tentative Map to May 2, 2018. The developer plans to initiate development with twenty-five homes (25) as early as the fiscal year 2018/2019 and fully built out within five years. As of December 2017, a Final Map has yet to be submitted to the County of Imperial but the Tentative Map is still eligible for three more time extensions potentially extending the life of the Tentative Map to 2020. These development projects account for the future development of over 2,804 single- family residential units, over 1,065 multi-family units and approximately, 90.9 acres of commercial development, if developed as planned. Refer to Exhibit 3-C – Planned Development Within Heber Public Utility District’s Sphere of Influence which delineates the development projects. Exhibit 3-C also includes an 81-Unit Multi-Family Development planned for at the northeast corner of Dogwood and Correll Road. It should be noted that Heberwood Estates and Heber Meadows encompass a much larger Specific Plan Area. The areas identified are only those where development has not been completed. Phases 5 and 6 of Heberwood Estates and Phases 4 of Heber Meadows are pending to be constructed. All developers within Heber’s Sphere of Influence must work closely with the District and Imperial County. Additional permits may be needed through the Imperial Irrigation District who owns or holds drainage easements throughout the Imperial Valley. In summary, when developing in Heber and its Sphere of Influence, developers will need to work with multiple agencies. Page | 25 Heber Public Utility District Service Area Plan Growth and Phasing Projections January 2018 Page | 26 Heber Public Utility District Service Area Plan Growth & Pashing Projections January 2018 3.3 PROJECTED POPULATION INCREASE Population projections are difficult to ascertain because they are influenced by outside factors including the real estate market, employment opportunities, and fluidity of migration. Although projections are difficult to predict, they are necessary and critical for planning to ensure that infrastructure is adequate and that levels of service are acceptable. Population projections can take into consideration the number of anticipated projects and their proposed densities. As of the date of this Service Area Plan, two Specific Plans had been submitted and approved by the District and Imperial County for service consideration and development approval: Imperial Center and McCabe Ranch II. Heberwood Estates Tentative Tract Map and Heber Meadows Tentative Tract Map could also contribute over 1,200 people, while the McCabe Ranch II development could contribute up to 9,000 people at built out. 3.4 Current Population and Projection for the Next 20 Years The 2017 population for the Heber community is 6,979, based on active water service connections (1,785 residential units connected multiplied by the average household size of 3.91 persons per household). The population projections that follow are based on historic population growth rates. According to Imperial County’s Municipal Service Review (2011), the average annual growth rate over the last 40-year period for the countywide population is 2.28 percent.3 However, the growth rate in Heber is slightly higher at 2.71% based on the number of new residential water connections since 2000. From 2000 to 2010, the number of housing units rose 27.7 percent in Imperial County.4 The Heber Public Utility District Service Area had a base population of 3,508 as of 2005. Figure 1-A – Population Growth Within Heber Public Utility District from 1990-2010 documents the spike in growth to 6,000 by 2010, representing a 71 percent growth between 2005 and 2010 during the housing boom experienced throughout Imperial County and California in general. Heber Public Utility District grew in equal or larger percentages than most other urban areas in Imperial County. For example, the City of Imperial, one of the fastest growing cities in the State, grew 27 percent from 2005 to 2010 as documented in the US Census. In 2005, the City of Imperial’s population was 9,470 persons while its population in 2010 was 12,047. In the years since 2010, housing growth slowed down throughout the County with an overall growth of only 7.91%, but the community of Heber grew by 19.0% during the past seven (7) years. This is significant as it identifies the Heber Community as a highly competitive and attractive development community for investors. 3 Imperial County Municipal Service Review, 2011 p. 6. 4 Semuels, Alana. Los Angeles Times March 9, 2011. <http://latimesblogs.latimes.com/money_co/2011/03/census- california-housing.html> Accessed September 19, 2011. Page | 27 Heber Public Utility District Service Area Plan Growth & Pashing Projections January 2018 The majority of population growth within the existing District boundaries is expected to be modest. Figure 3-B – Population Projections for the Heber Public Utility District Service Area depicts a gradual population growth of 2.71% that would reasonably place the Heber Public Utility District population at 12,922 by 2040. If there are changes in the real estate market and the region development demand increases, the District will likely be directly impacted by new growth and expansion outside of the current District boundary within the Sphere of Influence. Figure 3-B Future Population Growth 30,000 27,456 25,000 22,482 20,000 17,509 n o it a lu 15,000 12,536 p o P 10,000 7,563 12,922 11,302 9,886 8,647 5,000 - 2020 2025 2030 2035 2040 Year Historic Growth Buildout Buildout Projections As previously noted, there are currently three (3) approved development projects where residential development can occur and contribute to Heber’s population growth. The Heberwood Estates Tentative Tract Map still has 208 single family lots yet to be developed; Heber Meadows Tentative Tract Map still has 105 single family lots; and McCabe Ranch II Specific Plan still has 1,582 single family lots and 718 multi-family residential units yet to be developed. At an average household size of 3.91 persons per household, at full buildout, these three residential projects can contribute to an additional 10,221 persons. Page | 28 Heber Public Utility District Service Area Plan Growth & Pashing Projections January 2018 There are other development projects that are in various stages of the planning process. Heber Foundation is a multi-family project proposed on Pitzer Road south of Highway 86. This 81-unit apartment can result in another 317 residents to Heber. Mosaic Specific Plan is an old project that went far along the application process, but the project stalled in 2015. The project area consisted of the development of approximately 201.5 acres. The Specific Plan area is generally comprised of two areas, a 159.7-acre parcel on the west side of Dogwood Road and a 41.8-acre parcel on the east side of Dogwood Road. The project would have included approximately, 1,154 dwelling units, 2.7 acres of commercial space, 25.2 acres of open space and 15.5 acres of public facilities which would be dedicated for the expansion of Heber Public Utility District’s Water Treatment Plant and administrative facilities. At full build-out, this project would generate approximately, 4,616 residents, if it is ever re-initiated. In addition to these potential development projects, there are approximately 417 acres of undeveloped land within Heber’s district boundaries but only an estimated 83 acres zoned for residential uses as noted in Table 3-B. Of these 83 acres, 34 acres are zoned for medium-high density residential while the remaining 49 acres are for single family residences. Combined, these residential parcels could result in 1,239 dwelling units with a projected population of 4,843. Table 3-B notes all the available undeveloped residential land within the Heber Public Utility District Service Area. Table 3-B Available Undeveloped Residential Land Within The Heber Public Utility District Acres of Land Maximum Potential Available for Density Per Equivalent Zoning Development 1 Acre Dwelling Units R-1 – Low Density Residential 49 5 244 R-3 – Medium-High Density Residential 34 29 995 R-4 – High Density Residential & MHP 0 0 Total Residential Units 1,239 Total Population 4,843 1 Areas within Approved or Proposed Specific Plan Areas and Tentative Tract Maps are excluded The remaining 293 acres of undeveloped non-residential lands may result in an increased demand of 663 equivalent dwelling units to the water and wastewater systems, as shown in Table 3-C. Page | 29 Heber Public Utility District Service Area Plan Growth & Pashing Projections January 2018 Table 3-C Available Undeveloped Non-Residential Land Within the Heber Public Utility District Land Available Potential for EDU Per Equivalent Zoning Development Acre2 Dwelling Units C-2 – Medium Commercial 13.9 5.12 71 C-3 – Highway Commercial Area 0 6.55 0 M-1 – Light Industrial 68.55 7.77 533 A2G-SPA – Agricultural, General3 235 NA 0 A3G-SPA – Agricultural, Heavy3 0 NA 0 GS Government/Special 16.94 3.48 59 Total Equivalent Dwelling Units 663 2 Equivalent Dwelling Units (EDU) per acre is derived from City of Eugene Urban Sanitary Sewer Master Plan average flows in gallons per gross acre for varying land use types. The number was then multiplied by 391 gallons of wastewater per dwelling unit. 3 Equivalent Dwelling Units (EDU) were not calculated for agricultural specific plan areas. As the underlying zoning designation is agricultural, only non-potable water is used. These areas can be developed into a multitude of uses but those uses are undefined until such time as a Specific Plan is actually prepared and adopted for those areas. Although phasing plans were presented in the approved Tentative Tract Maps and Specific Plan, those timelines are no longer valid due to the slowdown in residential development throughout the County. It is unknown when development will pick up again, but job creation can contribute to indirect population growth. Imperial Center is projected to create over 200 long-term jobs for the region at full buildout (Source: Comprehensive Economic Development Strategy (2010-2011) p. 50). A steady job growth within the Heber Public Utility District could certainly entice new developers to construct housing near premier commercial development, contributing to the growth of the Heber Public Utility District service area. The Imperial Center is located directly east of Highway 111 and consists of over 77 acres of property zoned C-3 – Highway Commercial Area. The Imperial Center Specific Plan indicates that the Imperial Center is expected to provide approximately 900,000 square feet of commercial facilities. Below are the project’s proposed commercial land uses: Page | 30 Heber Public Utility District Service Area Plan Growth & Pashing Projections January 2018 Table 3-D Imperial Center Proposed Commercial Land Uses Size Land Use 1. Information/Exhibit/Auction Center 15,000 SF 2. Wholesale outlet 460,000 SF 3. Food court 13,000 SF 4. Parking Space (Previously Cinema) 83,000 SF 5. Hotel (200 rooms) 135,000 SF 6. Plaza/Auction Court 95,000 SF 7. Hotel Plaza/Restaurant 5,000-10,000 SF 8. Convenience Market with a Filling Station 37,000SF 9. Eleven Commercial Pads 5,000 SF/Commercial Although the proposed land uses will not have a direct impact on population growth, the proposed uses will undoubtedly indirectly influence population growth and consequently will impact services provided by the District and other agencies. It is difficult to predict when all of these projects would be fully realized, but at full buildout, the projects combined can contribute an additional 15,050 residents. If these projects are to be built during the 2040 planning horizon of this Service Area Plan, Heber’s population could reach 27,456 residents as noted in Table 3-E and the proceeding Figure 3-B. Table 3-E Population Projections for Heber Public Utility District Population at 2.71 % Year Growth Rate Population at Buildout 2020 7,563 7,563 2025 8,647 12,536 2030 9,886 17,509 2035 11,302 22,482 2040 12,922 27,456 Page | 31 Heber Public Utility District Service Area Plan Growth & Pashing Projections January 2018 Page | 32 Heber Public Utility District Service Area Plan Public Facilities and Services January 2018 4.0 PUBLIC FACITILITES AND SERVICES 4.1 SERVICES PROVIDED BY THE HEBER PUBLIC UTILITY DISTRICT The Heber Public Utility District, as a special district, provides a limited amount of services that include wastewater collection and treatment services, potable water treatment and distribution services, administrative services and parks and recreation services to residents within the District’s service area. A cursory review is also provided for all other services provided by other agencies. Facilities planned for and financed by the District for services provided by the Heber Public Utility District are described below and a full analysis is provided under this Service Area Plan Section. • Administrative Facilities- Administrative facilities include buildings that house administrative staff that provide general administrative services to Heber residents and business owners. Examples of administrative services include utility billing and collection, services to the Board of Directors, and other functions of the District. • Parks and Recreation Facilities- Parks and recreation facilities include open space areas, both improved and unimproved for recreational use. Facility amenities within the parks may include swings, slides, and shade structures for the use of the public. Only those park facilities owned by the Heber Public Utility District or those contracted by Heber Public Utility District for the provision of services are applicable under this discussion. • Wastewater Treatment and Sewer Facilities- Wastewater treatment and sewer facilities include the District’s Wastewater Treatment Plant and the sewer collection system that collects and conveys the wastewater to the Wastewater Treatment Plant. Wastewater Facilities also includes various sewer lift stations that are owned by the Heber Public Utility District. • Water Treatment and Distribution Facilities- Water treatment and distribution facilities include the District’s Water Treatment Plant and the distribution pipelines that convey potable water to residences within the Heber Public Utility District Service Area. Water facilities may further include any water transmission lines and pump systems necessary for the adequate conveyance of water. • Solid Waste Services and Facilities- Solid waste services include the trash collection services provided through Heber Public Utility and outsourced to CR&R. The contracting and administration is handled by the Heber Public Utility District. Facilities discussed include landfills where solid waste is disposed of and includes Allied Waste Landfill as a primary facility. Page | 33 Heber Public Utility District Service Area Plan Administrative Facilities January 2018 4.1.1 ADMINISTRATIVE FACILITIES Administrative services for the Heber community are provided in part by the Heber Public Utility District and in part by Imperial County. The Heber Public Utility District provides administrative services for the community of Heber incidental to Wastewater, Water Treatment, Solid Waste and Parks and Recreation services as well as some lighting and drainage facilities. Additionally, Imperial County provides a number of public services to the Heber community and the general countywide population. Performance Standard for Administrative Facilities Imperial County’s performance standard for administrative facilities in unincorporated areas is 1,030 square feet per 1,000 population which is not being adopted by the HPUD. Based on information provided by HPUD Staff, the current administrative facility used by HPUD staff measure 1,300 square feet and accommodates a staff of five. This 1,300 square-foot space is for the office area and does not include public restrooms or public meeting space which are shared by HPUD personnel with County Fire personnel. Current management finds that HPUD’s administrative functions are outgrowing the current space. As the number of service connections continue to grow, records storage is becoming an issue and additional personnel may be needed to service future population. The existing staff of five represent a ratio of 0.71 personnel per 1,000 people. Based on this ratio, an additional personnel will need to be hired prior to 2025 and a total of nine personnel is needed prior to 2040. The existing 1,300 square feet works out to an average of 260 square feet per personnel. In 2040, the nine total personnel will require a space of 2,340 square feet, not including additional file storage space and other ancillary office uses. The public facility should further be accessibility to the public including the availability of a boardroom for public meetings. Inventory of Existing Administrative Facilities The HPUD Administrative Offices lease space in the “Heber Essential Services Building” owned by Imperial County. The Heber Essential Services Building consists of approximately 13,020 square feet. Only approximately 3,125 square feet are reserved for offices and administrative functions. Of the building’s 13,020 square feet 76 percent is used for other Imperial County Services including the County’s Fire Department, and the Sheriff’s office as depicted in Exhibit 4-A. The remaining 1,300 square feet are leased by the District. Page | 34 Heber Public Utility District Service Area Plan Administrative Facilities January 2018 Page | 35 Heber Public Utility District Service Area Plan Administrative Facilities January 2018 The building is located at 1078 Dogwood Road, Suite 103 in Heber and was constructed in 2004 and is in sound condition. The Heber Essential Services building is maintained by Imperial County. However, there are no sidewalks to or from the facility for residents walking to the HPUD Offices for business purposes and the County Emergency Operations Center doubles as the HPUD Boardroom, thus restricting availability for public meetings. Building maintenance costs are shared by Imperial County and the Heber Public Utility District. According to the HPUD staff operation budget for building expenses, including utilities and building maintenance, expenses average $23,000 a year. However, the County does not pay a fair share of water, sewer or trash fees. Adequacy of Administrative Facilities The Heber Essential Services Building is less than fifteen years old and the leased space is adequate to meet the current demands. The current staffing level is adequate to service the needs of existing demand. Additional personnel will need to be hired in the next 3-5 years and additional office space will be needed. Additional challenges with the current facility are location and its accessibility to the public as there are no sidewalks to and from the HPUD facility and it lacks a boardroom for public meetings. As the community continues to grow, so does the need for additional facilities, such as a community center, that can be collocated with administrative facilities. HPUD is considering the option to acquire and/or construct an administrative center, independent from the County Essential Services Building. Inventory of Approved Administrative Facilities The Heber Public Utility District has active plans to relocate to a new administrative facility or to construct a new administrative facility that will meet all the community needs. Funds have been set aside for FY 18/19. Additionally, the HPUD owns a 0.16 acres parcel at the intersection of Bloomfield Street and Littlefield Way which is a residential zone. The HPUD plans to install a premanufactured building during the 18/19 FY and share it with the Heber Community Foundation for the purpose of providing recreational services to the community. While no additional administrative facilities are planned during the next five (5) years, the HPUD will initiate phased expansion plan options. Buildout Demand for Administrative Facilities A substantial increase in population will undoubtedly result in an increased demand for public services and the administration of the same. Ultimate buildout can result in a population of up to 27,456 residents and service demand from a total of 7,467 equivalent dwelling units. At a ratio of 0.71 personnel per 1,000 population, HPUD will need a total of 19.5 personnel which will require additional office space. Page | 36 Heber Public Utility District Service Area Plan Administrative Facilities January 2018 Opportunity for Shared Administrative Facilities As previously stated, Heber’s Administrative office is shared with the Imperial County Fire Department (Station #2), Sheriffs Activity League, and the Sheriff’s Department. Should the District initiate expansion plans at a new location, the HPUD will consider consolidation with operations facilities and possible share of space with other community facilities such as the Heber Community Foundation. Phasing of Administrative Facilities The District has adopted the planned relocation of administrative facilities, and new recreational facility into their current Capital Improvement Program. If the Mosaic Specific Plan or other major development project comes into fruition, additional phased expansions may be needed by the year 2030. The HPUD will evaluate options for expansion under a facility plan to be adopted within the next five years in order to adequately phase out any future expansion needs. Mitigation for Administrative Facilities The Heber Administrative Facilities may be adequate in size, location, and condition to continue to serve the anticipated population increase throughout a twenty (20) year planning term if lease expansion opportunities within the Heber Essential Services building remains an option. The HPUD shall incorporate the following Mitigation Measures in orderly to properly plan for future administrative facility needs: A-1 The HPUD shall prepare a Facility Plan for the Administrative and Board Room services that analyzes the number of personnel required to service future population and the amount of space required for the number of employees. The Facility Plan shall include a cost-benefit analysis comparing options for continuing to lease or relocation, acquisition, or new construction elsewhere. A-2 The HPUD shall ensure that its current impact fees considers the capital costs of any new administrative facilities that may be necessary to serve the Heber Community. Page | 37 Heber Public Utility District Service Area Plan Administrative Facilities January 2018 4.1.2 PARKS AND RECREATION FACILITIES The Heber community is an unincorporated area and as such the parks and recreational service provisions are the primary responsibility of Imperial County. The HPUD has entered into service agreements with Imperial County on the operation and maintenance of certain park facilities. The Heber community has four (4) parks and the HPUD owns all four of them. The HPUD is responsible for maintaining parks and retention basins that have a dual use as parks within the service area. Currently, the District has two (2) staff members dedicated to the maintenance of parks and retention basins. As new development occurs, parkland dedication and improvement are required in order to accommodate the increased population and maintain adequate service ratios. Performance Standard for Recreational Facilities The Heber Public Utility District’s performance standard ratio is larger than the State’s minimum ratio for park facilities of three acres of park space per 1,000 persons, consistent with the Quimby Act of 1975. The District and the Imperial County use a service ratio of five (5) acres of parkland per 1,000 persons. Inventory of Existing Recreational Facilities Currently, the Heber community has 21.53 acres of parkland and a population of 6,979 for a park ratio of 3.09 acres per 1,000 persons. Playground equipment and improvements to parks differentiate among the various District parks. It is calculated that approximately 15.80± acres of parkland are unimproved open space, while approximately 5.73± acres of parkland are improved with playground equipment and park furniture. Table 4-A Existing Parks in Heber Park Name Owner Location Size Northwest Corner of Correll Rd. Estancia Park HPUD 7.02 AC and Cherry St. Southwest Corner of Bloomfield Edward “Jiggs” Johnson Park HPUD 3.72 AC St. and Littlefield Way Heber Children Park HPUD 39 Crane Lane 0.41 AC Margarito “Tito” Huerta Jr. Northwest Corner of Palm Ave. HPUD 10.38 AC Park and Hawk St. Total Acres of Parkland 21.53 AC Page | 38 Heber Public Utility District Service Area Plan Administrative Facilities January 2018 Estancia Park – The 7.02-acre Estancia Park serves two functions, as a park and as a retention basin. The park contains a shaded tot lot, basketball court and benches. There are no restroom facilities at Estancia Park, nor are there any security lights thus limiting park use and safety. Edward “Jiggs” Johnson Park – The 3.72-acre park commonly referred to as “Jiggs” Park is one of the newest parks within the District. Although the park has not been fully completed, it includes a shaded tot lot as well as community amenities including barbecue grills. There are also no restroom or adequate lighting facilities at Edward “Jiggs” Park. Heber Children’s Park – The 0.41-acre Children’s Park is one of the District’s most mature park areas located within close proximity to the center of the Townsite. Existing amenities at the park include a tot lot, mature trees, and benches. The Heber Children’s Park does not contain restroom facilities. Margarito “Tito” Huerta Jr. Park – The 10.38-acre park is the largest park in the District and the only park that includes a baseball diamond. New sports lights were installed in 2017 enabling its use after hours of both the baseball field and soccer field. The park also includes public restrooms and mature trees. Park and Recreational Facilities Map Park facilities are located throughout the Heber community. New development areas under a Specific Plan are required to incorporate parkland within their proposed development. Typically, in the land development process, Imperial County requires that developers dedicate land for parks and a financing mechanism is put in place for their ongoing operation and maintenance. Exhibit 4-B, HPUD Park and Recreational Facilities Map, delineates park locations throughout the District’s Service Area. Adequacy of Existing Park and Recreational Facilities The National Recreation and Parks Association (NRPA) published park location, size, and amenities standards in 1970 and is still widely used. The NRPA recommends that a neighborhood park of 1-2 acres in size for every 1,000 residents be located within a half-mile radius of all residential uses. NRPA standard further require certain amenities based on population size. For example, one (1) picnic shelter and one (1) playground equipment should be provided for every 2,000 residents. Most communities will use NRPA standards as a starting point in determining the type of amenities required. . Page | 39 Heber Public Utility District Service Area Plan Park and Recreational Facilities January 2018 Page | 40 Heber Public Utility District Service Area Plan Park and Recreational Facilities January 2018 Given that there are currently 21.53 acres of parkland to serve the current population of 6,979, Imperial County, and thus the District, are currently not meeting the County’s performance standard ratio of 5 acres for 1,000 when only the immediate community is taken into account. Moreover, it is the responsibility of Imperial County to meet this park standard county-wide. The current deficiency ratio as of the date of this report is 13.36 acres in parkland. Inventory of Approved Recreational Facilities Other than the existing four (4) parks and retention basins with a total area of 21.53 acres of open space, there are 51.6 acres of park facilities and open space within the proposed McCabe Ranch II Specific Plan. There is additional parkland proposed under the Mosaic Specific Plan, but since that project has not been approved, it is not included in the inventory of approved recreational facilities. Buildout Demand for Recreational Facilities As previously noted, the performance standard for the District is currently 5 acres of parkland per 1,000 persons. A total of 65 acres is required by 2040 to serve the projected population of 12,922 persons (based on 2.71% growth rate). However, a total of 150 acres would be required if all approved residential projects and developable parcels are built. Opportunity for Shared Recreational Facilities Some stormwater facilities such as retention basins serve a dual purpose as some are also utilized by the District as public parks. Retention basins are land intensive and necessary in the event of a 100-year storm. In order to use land efficiently, the District has used shallow retention basins for park space by providing park amenities such as basketball courts, and picnic tables among other outdoor recreational improvements within the designated retention basins. In total, of the 21.53 acres of park space within the District, 17.4 acres or 81 percent of park space is also retention basin space. Table 4-B Shared Retention Basin/Park Space Park Name Owner Location Size Continental Northwest Corner of Correll Rd. Estancia Park 7.02 AC Residential and Cherry St. Northwest Corner of Palm Ave. Margarito “Tito” Huerta Jr. Park HPUD 10.38 AC and Hawk St. Total Acres of Parkland 17.4 AC Page | 41 Heber Public Utility District Service Area Plan Park and Recreational Facilities January 2018 Yet another opportunity that the District can explore for shared Park facilities is to form a Joint Use Agreement with the Heber Elementary School District for use of school grounds for recreational facilities outside of school hours. Within the District Limits, there are currently two elementary schools, both of which are approximately 16 acres in size and include recreational activities during the after-school hours and on weekends. Since the existing performance ratio is not being met for recreational open space, joint use with the School District may be a viable option for the County of Imperial to extend recreational services or for HPUD to extend recreational services. If the HPUD is going to initiate the provision of recreational services (aside from facilities) it is recommended that a discussion regarding Joint Use Agreements occur among Heber Public Utility District Staff and the Heber Elementary School District as infill development occurs within the Townsite in order to maximize the amount of recreational opportunities available to the public. Currently, community groups such as the Police Athletic League (PAL) and the Sheriff’s Athletic League (SAL) are authorized to use the baseball diamonds at Heber Elementary School. It is important to note that the baseball fields at Dogwood Elementary School are currently not available for the use of community groups. When groups request the use of the fields they are required to sign a Hold Harmless Agreement and a Liability Form (Source: Heber Elementary School District, Administrative Staff (October 2017). Per Heber School District Staff, the fields are widely used by the local athletic leagues. Phasing of Recreational Facilities Facilities planned under Specific Plans will be phased according to the planned development further discussed under the Growth and Phasing Projections, Section 3.0 of this SAP. It is anticipated that the District may acquire new park facilities in the years 2015-2025 as McCabe Ranch II develops. If Mosaic comes into fruition, additional park space may be acquired beyond 2030. Mitigation for Recreational Facilities The Heber parks and Open Space Facilities do not meet the established performance standards of five acres per 1,000 in population. The existing facilities are adequate in size and location, but there are insufficient facilities to adequately serve the current population or existing facilities are lacking lighting or restroom amenities. The following Mitigation Measures are recommended: P-1 As new development is proposed, the District shall coordinate with Imperial County to ensure that projects are required to incorporate park space per the performance standard of five (5) acres per 1,000 in population. P-2 The District shall seek grant opportunities to improve existing park space with lighting and necessary amenities. Page | 42 Heber Public Utility District Service Area Plan Park and Recreational Facilities January 2018 P-3 The District shall pursue grant resources to develop land currently owned by the District for recreational use as long there are identified resources for the continued operation and maintenance of any new facilities. P-4 The HPUD should determine whether the 19 acres the District owns off of Rockwood Avenue (west of the Wastewater Treatment Plant) will be reserved for a regional recreational park and any affirmative decision should be accompanied by an adopted resolution on the share of costs for operation and maintenance costs with the County of Imperial. Page | 43 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 4.1.3 WASTEWATER TREATMENT AND COLLECTION FACILITIES The Heber Public Utility District owns, operates and maintains a Wastewater Treatment System which provides wastewater collection and treatment services to the Heber community, and areas immediately outside of the District boundary, but within the Sphere of Influence. The wastewater treatment plant (WWTP) is located at 1184 Rockwood Avenue at the southeast intersection of Correll Road and Rockwood Avenue in Heber, California. The wastewater treatment plant serves an area of approximately 8.7 square miles. The Wastewater Treatment Plant was constructed in the 1960’s and expansions were completed in 1981 and 2002. A wastewater treatment plant expansion project was initiated on November 2011 and completed in 2013. Performance Standards for WWTP and Sewer Collection Facilities Wastewater Treatment Plant- The Performance standards and requirements for the Heber Municipal Wastewater Treatment Plant are governed by the National Pollution Discharge Elimination System (NPDES) discharge permit number CA0104370 adopted by the California Regional Water Quality Control Board, Colorado River Basin Region on June 23, 2011 by Board Order Number R7-2011- 0019. The NPDES permit under which the Heber Municipal Wastewater Treatment Plant operates became effective on July 1, 2011 and the facility was brought into compliance under the 2013 Expansion project. The NPDES permit establishes the Waste Discharge Requirements (WDR’s) for the wastewater treatment plant. The NPDES permit establishes the rated capacity of the wastewater plant, discharge prohibitions, effluent limitations and discharge specifications, receiving water limitations, standard provisions for the operation of the wastewater treatment plant, monitoring and reporting program requirements, compliance requirements and special provisions. The NPDES discharge permit establishes the standards and criteria by which the Heber Municipal Wastewater Treatment Plant operates. Sewer Collection System- The Heber Public Utility District utilizes standards established by the California Department of Public Health, the Water Environment Federation (WEF) and American Water Works Association (AWWA) to establish performance standards and criteria for the wastewater collection system. The Heber Public Utility District also adopted Standard Details and Specifications in 2004 addressing the Technical requirements for the sanitary sewer collection system. Design capacity of a pipeline is the general calculated capacity of the pipeline using the Manning formula. For system analysis, peak dry weather flow (PDWF) does not exceed 75 percent of the design capacity of the pipeline. Accordingly, 25 percent of the pipeline capacity is reserved to accommodate peak wet weather flow (PWWF) incurred during wet weather conditions. The 25 percent reserve is Page | 44 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 therefore provided to account for groundwater infiltration and rainfall dependent inflow, plus additional sewer capacity reserve allowance. This 25 percent reserve contingency factor is a commonly used allowance in evaluating wastewater utilities. The following are general design criteria for determining pipeline capacity: Table 4-C Wastewater Pipeline General Design Criteria Pipeline Size Flow Capacity 8” to 10” 1/2 Full @ Peak Flow 12” to 18” 2/3 Full @ Peak Flow 21” and Greater 3/4 Full @ Peak Flow Gravity pipelines should also have a general peak flow velocity of 2.0 fps (feet per second) at PWWF to ensure adequate flow. Pipelines that cannot reach this minimum flow velocity should be assisted with pump stations. Pump station adequacy is based on two criteria: 1) the ability of the pump station to pump the PWWF and 2) wet well adequacy for pump cycling. Inventory of Existing WWTP and Sewer Collection Facilities Wastewater Treatment Plant The existing wastewater treatment plant is currently located on a 6.7-acre site (net acreage). The Heber Public Utility District acquired 8.55 acres of property east of and adjacent to the existing 6.7-acre site for future expansion purposes. In addition, the Heber Public Utility District owns 19.27 acres west of the existing wastewater treatment plant bounded by Rockwood Avenue on the east, Correll Road on the north and the Union Pacific Railroad tracks on the west. The 8.55- acre parcel could be used for future wastewater treatment plant expansions as necessary while the 19.27 acre site may be restricted to recreational use if the HPUD decides to dedicate it as a regional park. The existing wastewater treatment plant consists of an influent channel facility, influent pump station, a headworks facility, an aerator system, two (2) oxidation ditches, two (2) secondary clarifiers, an ultra violet (UV) disinfection system, two (2) return activated sludge (RAS) pumps and two (2) return and waste activated sludge (WAS) pumps, scum lift station, a sludge thickener facility and a sludge digester facility, sludge dewatering facilities and sludge drying beds, an operations building, electrical power facilities and instrumentation and control facilities. Major components are described as follows. Page | 45 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 Influent Channel Facility- includes two (2) parallel Comminutors, a manual bar screen, a Parhsall Flume flowmeter unit, and an Influent Sampler. The Comminutors will operate in duty and standby mode to shred and grind large solids entering the Influent Channel Facility. The manual bars are located immediately downstream of the Comminutors and catches mostly long and stringy solids such as rags and plastic. As wastewater exits the Influent Channel Facility it goes through a Parshall Flume flowmeter. Influent Pump Station- is composed of a Wet well, three (3) submersible pumps, and a pressure transmitter / float control system. The Wet well is designed to temporarily store wastewater entering the Influent Pump Station. The submersible pumps will operate in duty and standby mode. The submersible pumps will convey wastewater through a valve vault (gate valves, and check valves) into a pipeline manifold connecting all three (3) pumps pipelines. Headworks Facility- is enclosed in a pre-engineered metal building with all structural and architectural aspects. It will receive wastewater from the Influent Pump Station. Within the Headworks Facility, raw wastewater will go through one of two Rotary Drum Screens with Screening Washer Units and a Grit Trap, with Grit Classifier before discharging into a Headworks Splitter Box. The Headworks Facility will also receive Recycled Activated Sludge from the Secondary Clarifiers. The combination of screened wastewater and recycled activated sludge creates mixed liquor. The Headworks Splitter Box will have the capability to distribute mixed liquor to two Oxidation Ditches (No. 1 and No. 2, and/or the STM Aerotor. Mixed liquor conveyed to the Oxidation Ditches will be gravity fed via an 8-inch diameter pipeline, for each. Mixed liquor conveyed to the STM Aerotor will be gravity fed via a 24-inch diameter pipeline. STM Aerotors- is comprised of concrete aerator basins with STM Aerotor Units, anoxic tanks with a submersible mixer, and a concrete effluent Collection/Splitter Box, and two (2) trains that operate in parallel. The STM Aerotor will receive mixed liquor from the Headworks Facility. The mixed liquor will go through an activated sludge treatment process, which forms activated sludge within the mixed liquor. The mixed liquor will then weir into an STM Aerotor Collection/Splitter Box. The STM Aerotor Collection/Splitter box will receive the mixed liquor flows from Oxidation Ditch No. 1, Oxidation Ditch No. 2 and/or the STM Aerotors. The STM Aerotor Collection/Splitter Box may distribute mixed liquor flows to secondary clarifiers via independent gravity 20- inch diameter pipelines. The STM Aerotors will operate in parallel with the Oxidation Ditches. Oxidation Ditches-each of the two (2) Oxidation Ditches will also receive mixed liquor from the Headworks Splitter Box and comprised of an Aeration Ditch (racetrack figured channel), two rotor aerators and effluent weir. The Page | 46 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 mixed liquor will go through an activated sludge treatment process. The mixed liquor then flows over the outlet weir and will gravity flow to the STM Aerotor Splitter Box via a 14-inch diameter gravity pipeline. The oxidation ditches are identical and referenced as Oxidation Ditch No. 1 and No. 2. Each Oxidation Ditch will operate in parallel to each other and the STM Aerotor. Secondary Clarifiers- will receive wastewater from the mixed liquor splitter box, located downstream of the STM Aerotors and Oxidation Ditches. The Secondary Clarifiers are circular concrete tanks. The mixed liquor will then go through a sedimentation process which produces clear effluent, scum and activated sludge. There are two Secondary Clarifiers, identified as Secondary Clarifier No. 1 and No. 2. The Secondary Clarifiers are to operate in parallel or as standby and duty modes. Their purpose is to operate a sludge collector rake at the bottom of each tank and scum collector rake on the water surface, and an effluent weir assembly. Ultraviolet (UV) Disinfection System- is composed of two (2) trains, which have the capability to operate in parallel. However, each train is to operate in duty and standby mode. The UV System is shaded and composed of two (2) channels, four UV banks (UV disinfection lamp assemblies), a Power Distribution Center, and a Hydraulic System Center for self-cleaning of the UV lights. Clear effluent is discharged into the UV System channel inlet chamber, where it is directed to any of the two (2) channels. Each channel is composed of two banks of UV modules. Each bank consists of four (4) modules. Each module contains six (lamps) and a self-cleaning mechanism for the lamps. As water flows through channels, the lamps are powered on and complete disinfection of the clear effluent referred as plant effluent. Return Activated Sludge (RAS) and Waste Activated Sludge (WAS) Pumps- are located in a pump room within the Headworks Building. There are two (2) RAS Pumps and two (2) WAS Pumps along with the associated piping, valves and flowmeters. The RAS pumps and WAS pumps will operate in duty and standby mode. Scum Lift Station-includes a Wet Well, two (2) submersible pumps, and a mixer. The Wet well is designed to temporarily store scum entering the Scum Lift Station. The submersible pumps will operate in duty and standby mode. The submersible pumps will pump wastewater through a valve vault (gate valves, and check valves) into a pipeline for Wasting. Sludge Thickener Facilities- include a Sludge Pre-Thickener, a Sludge Post- Thickener, and a Thickener Pump Station. The Pre-Thickener and the Post- Thickener operate independently of each other. The Pre-Thickener and Post- Thickener Facilities are composed of shaded circular concrete tanks that are currently being used as Secondary Clarifiers. The Thickener Pump Station is Page | 47 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 composed of two pumps which operated in duty and standby mode and may be used for the Pre-Thickener and the Post-Thickener. The Thickener Pump Station discharges the thickened sludge via a 4-inch diameter forcemain pipeline and series of valves that allow the operators to direct flows, to the Sludge Digester, Sludge Dewatering Facility, or Sludge Drying Beds. Sludge Digester Facilities- include two (2) Digesters that are operated in parallel and a Digester Pump Station. The Digester Facilities include floating aerator mixer, gates and valves. The Digester Pump Station is covered by a Shade Structure. The Digesters are to accept thickened sludge or waste sludge into the center of the tank. A floating mixer located at the center of the tank will mix and aerate the sludge to promote the digestion process. The digested sludge (stabilized sludge) will then be pumped to the Post-Thickener, Sludge Dewatering Facility or the Sludge Drying Beds via the Digester Pump Station. Sludge Dewatering Facilities- are comprised of the two (2) sludge dewatering units that operate in parallel. The Sludge Dewatering Units are housed within a Solids Handling Building. The Sludge Dewatering units operate in duty and standby mode. A Sludge Dewatering Unit is composed of Screw Press, Polymer Feed System, Flocculation Reactor, and Screw Conveyor. The Sludge Dewatering Facility also includes piping, valves, and drainage facilities. Sludge from the Dewatering units may be disposed or placed in a Sludge Drying Bed for further drying. Sludge Drying Beds-receive wasted sludge or sludge cake. The sludge drying beds are composed of sand media and underdrain collection system. There is a total of 13 Sludge Drying Beds. The Sludge Drying Beds will receive wasted sludge via forcemain pipelines, while sludge cake will need to be dumped via a trash dumpster and spread for drying. Upon complete drying the dried sludge cake will disposed, while the filtrate will gravity flow to the Influent Channel Facility for retreatment. Sewer Collection System The existing wastewater collection system is composed of sanitary sewer gravity pipelines, sanitary sewer forcemains and wastewater pump stations. The collection system conveys wastewater from the residential, commercial, industrial, institutional, government, school and church developments in the community to the Heber Public Utility District Wastewater Plant for treatment and disposal. The Heber Public Utility District Collection System serves users within the HPUD District boundary except for a few users located on the exterior edges of the District Boundary, but within the Sphere of Influence. Refer to Exhibit 4-C – Existing Wastewater Collection and Sewer Facility Schematic Map. Page | 48 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 A deep gravity 30-inch diameter pvc sanitary sewer pipeline was constructed along Correll Road from Farnsworth Road on the west to Pitzer Road on the east. The Imperial Center Project extended a 30-inch diameter PS46 pvc deep gravity pipeline along Correll Road from Pitzer Road to the IID Strout Drain and a 24-inch diameter PS46 pvc pipeline from the IID Strout Drain, for a distance of 500 feet east of Highway 111 terminating along Abatti Road. The deep gravity Correll Road main collector sanitary sewer pipeline flows to the HPUD Regional Pump Station located at the southeast corner of Rockwood Avenue and Correll Road within the north end of the existing HPUD Wastewater Treatment Plant compound. Effluent Pump Stations As of 2017 there were a total of seven wastewater pump stations within the Heber Public Utility District Collection System. The HPUD owns and operates one main Regional Pump Station. The Regional Wastewater Pump Station serves as the “backbone” collection system infrastructure to extend a network of additional main collector gravity pipelines to serve the Heber Public Utility District Service Area while the remaining stations are auxiliary. The Regional Pump Station is a duplex submersible pump station utilizing a concrete wet well 16 feet x 16 feet x 38.5 feet deep. The Regional Pump Station is equipped with energy efficient variable frequency drive pumps. The pumping units pump at a flow rate equal to the wastewater flow entering the pump station. The electrical panels and mechanical piping have been oversized to accommodate the installation of larger pumps and electrical variable frequency drive units in multiple future phases as wastewater flows increase. The Regional Pump Station is capable of accommodating peak wastewater flows of 9,203,040 gallons per day (average daily flow of 4,320,000 gallons per day). The existing wastewater treatment plant is rated at a capacity of 1.2 million gallons per day. The HPUD Regional Pump Station is capable of transmitting 7.6 times the flow that the HPUD Wastewater Treatment Plant is capable of treating. Page | 49 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 Page | 50 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 Although the HPUD Regional Pump Station is a major pump station capable of serving the majority of the Heber Public Utility District Service Area, the remaining pump stations are relatively small and serve dedicated users or specific residential areas. One (1) of the smaller sewer pump stations is private serving the Sunrise Desert Apartment Complex near the southwest corner of Heber Road/State Highway 86 and Pitzer Road. A listing of the sanitary sewer pump stations follow under Table 4-D. Table 4-D Sanitary Sewer Pump Station List Item Lift Stations # Pumps/Pump Notes No. Capacity(gpm)/ Total Dynamic Head (feet) 1 6th St./Grand Ave. 2 pumps/300 gpm/20 ft Residential 2 Parkyns Ave./9th St. 2 pumps/300 gpm/20 ft Residential Geothermal School 3 Dogwood Rd./Fawcett Rd. 2 pumps/300 gpm/20 ft Geothermal 4 Fawcett Rd./Ware Rd. 2 pumps/300 gpm/20 ft Cattle Yard 5 Correll Rd/Rockwood Ave. 2 pumps/500 gpm/47 ft Regional P.S. 6 Pitzer and Fawcett Rds. 2 pumps/300 gpm/20ft Not Active Adequacy of Existing WWTP and Sewer Collection Facilities Wastewater Treatment Plant- The Heber Public Utility District Wastewater Treatment Plant underwent a major rehabilitation and expansion in 2013. As a result of the project the WWTP has a current design and permitted capacity of 1.2 MGD. The average daily flow received at the Heber Public Utility District Wastewater Plant in 2016 was approximately 0.462 million gallons per day with peak flows of 0.609 million gallons per day according to Plant Operators. Thus, the WWTP is operating at less than 50 percent of capacity. The averages daily flows and peak flows for 2017 (as of October 2017) were marginally lower. Sewer Lift Stations- The District’s existing sewer lift stations are for the most part adequate. Repairs are needed for the 6th Street and Grand Avenue lift station which serves a residential neighborhood. Improvements to the Parkyns Avenue and 9th Street lift station are also needed. The Parkyns and 9th Street lift station provides critical services to the geothermal facilities, the schools, and residential neighborhoods. Both facilities need suction lines replaced. Additionally, the influent pump station at the Wastewater Treatment Plant is also in need of repair. Sewer Collection System-The wastewater gravity pipelines within the original Townsite of Heber are composed of vitrified clay pipe (VCP). The vitrified clay pipelines are located within the alleys and streets of the Old Townsite. The VCP Page | 51 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 pipelines were recently cleaned and video camera inspected by the Heber Public Utility District Maintenance Staff in 2011 and were reported to be in fair condition. The gravity PVC pipelines of the recently completed subdivisions and apartment units were constructed within paved street areas. All the newly constructed Apartment complexes and subdivisions, except for Correll Estates Subdivision and Heberwood Unit 1, were constructed from 2003 through 2009. The gravity sanitary sewer pipelines and manholes comprising the collection system for these Subdivisions and Apartment complexes are in good condition. Wastewater Collection and Sewer Facilities Schematic Maps The existing Wastewater Collection Main pipeline is along Correll Road and extends from Dogwood Road at the West end of Heber to the Imperial Center, East of Highway 111. The existing Wastewater Collection and Sewer Facility Schematic Map illustrates the location of the Wastewater Collection Pipelines existing and proposed. The map identifies Public and Private Sanitary Sewer Pump Stations and Sanitary Sewer Collection System Main Collectors and Branch Sanitary Sewer Pipelines. (Please Refer to Exhibit 4-D – Heber Public Utility District Main Collector and Pump Station Wastewater Schematic Map.) The existing wastewater collection system, generally, extends within the footprint of the Heber Townsite serving the majority of its residential, commercial and industrial population base. Inventory of Approved WWTP and Sewer Collection Facilities Wastewater Treatment Plant- The Heber Wastewater Treatment Plant was expanded from a rated capacity of 0.81 million gallons per day to 1.2 million gallons per day in 2013. Construction of the Wastewater Treatment Plant Expansion commenced on November 28, 2011 and consisted of the following: construction of a new headworks building; construction of an STM aerator basin with anoxic mixing tanks and installation of related equipment; construction of new clarifiers; installing of a UV disinfection system in the existing channel; converting existing clarifiers into thickeners and digesters; construction of a new solids handling; pumping systems; and all piping necessary for the new equipment and retrofitting of existing structures/equipment into the new treatment process. Page | 52 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 Page | 53 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 Planned Expansions- The 1.2 million gallon wastewater treatment plant includes the schematic layout of two (2) additional expansions; a 2.0 million gallon wastewater treatment plant expansion followed by a 2.4 million gallon wastewater treatment plant expansion. The expansion capacities will be governed by the core treatment units and the activated sludge aerator treatment units. Each activated sludge aerator treatment unit has been designed to treat 800,000 gallons/day. The two existing oxidation ditches were rated at a combined capacity of 400,000 gallons per day during the design phase. The improvement plan design criterion proposes to remove the existing oxidation ditches from service during the last phased expansion. Although an 800,000 gallon per day aerator basin will be constructed during the final phased expansion, the 400,000 gallon per day oxidation ditches will be removed from service. As a result, the last phased expansion will realize a net increased capacity of 400,000 gallons per day from a prior treatment plant capacity of 2.0 million gallons per day to 2.40 million gallons per day. See Exhibit 4-E Heber Public Utility District Wastewater Treatment Plant General Design Criteria/Plant Flow Diagram regarding the wastewater treatment plant design criteria, wastewater treatment plant schematic site plan and phased future expansion capacities. Collection System Improvements Collection system improvements are primarily tied to rehabilitation of existing facilities to accommodate projected flows. There are some collection improvements that are necessary to facilitate operation and maintenance. The following is a summary of collection system components that need relocation and/or replacement due to existing conditions: • Residential Sewer Collection Pipeline Relocation- There is one small 300’ section of sewer collection pipeline that encroaches into private property and will need to be relocated out of private residential property between Valley Boulevard and Grant Avenue and into 6th Street. It is estimated that an approximate 600 lineal feet of 6” diameter pipeline would need to be replaced to accommodate a properly aligned relocation. The project is estimated at $90,000. • Sewer Manholes- Due to the age of collection facilities several manholes are in need of rehabilitation or replacement. There is a need to rehabilitate at least sixteen manholes within the next five years at an estimated cost of $500,000. Page | 54 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 Page | 55 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 Buildout Demand for WWTP and Sewer Collection Facilities Anticipated Capacity- The 2017 average daily wastewater flow entering the Heber Public Utility District wastewater treatment plant was 437,000 gallons/day. However, the previous Service Area Plan documented that the 2010 average daily flows were 600,000 gallons per day. The decrease in average daily flows may be attributed to recent efforts in water conservation. While HPUD will continue to encourage water conservation measures, this Service Area Plan will use 600,000 gallons per day as a prudent basis for planning future capacity. As such, the 1.2 million gallon per day treatment plant is expected to provide a current excess capacity of 600,000 gallons per day to accommodate future growth. Section 5.2 of the Heber Public Utility District October 2006 Wastewater Treatment Plant Preliminary Engineering Report indicated the average daily per capita wastewater generation was 100 gallons per person per day. The residential per capita housing density in Heber is now 3.91 persons per residence as noted previously within the contents of this document. An equivalent dwelling unit (EDU) within the Heber Public Utility District is defined as the wastewater generation in a day by a single family residential housing unit. An EDU is therefore: 100 𝑔𝑎𝑙𝑙𝑜𝑛𝑠 𝑔𝑎𝑙𝑙𝑜𝑛𝑠 3.91 𝑝𝑒𝑟𝑠𝑜𝑛𝑠/𝑟𝑒𝑠𝑖𝑑𝑒𝑛𝑐𝑒× = 391 𝑝𝑒𝑟𝑠𝑜𝑛 − 𝑑𝑎𝑦 𝑑𝑎𝑦 − 𝑟𝑒𝑠𝑖𝑑𝑒𝑛𝑐𝑒 1 𝐸𝐷𝑈 = 391 𝑔𝑎𝑙𝑙𝑜𝑛𝑠/𝑑𝑎𝑦 The additional capacity of the 1.2 million gallon wastewater treatment plant is 600,000 𝑔𝑎𝑙𝑙𝑜𝑛𝑠 (𝑒𝑥𝑐𝑒𝑠𝑠 𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦) = 1,535 𝑠𝑖𝑛𝑔𝑙𝑒 𝑓𝑎𝑚𝑖𝑙𝑦 𝑟𝑒𝑠𝑖𝑑𝑒𝑛𝑐𝑒𝑠 𝑜𝑟 1,535 𝐸𝐷𝑈′𝑠 391 𝑔𝑎𝑙𝑙𝑜𝑛𝑠/𝐸𝐷𝑈 The recently renovated HPUD WWTP has been designed to be able to meet the phased future demand of the District. The new Plant is designed to be able to be easily upgraded to accommodate growth under phased expansions. The expanded HPUD WWTP provides an immediate average daily flow capacity of 1.2 MGD and is expected to provide adequate capacity for up to 3,000 Equivalent Dwelling Units (P. 1-5 of 2006 WWTP PER). Opportunity for Shared Wastewater Treatment and Sewer Facilities The Heber Public Utility District anticipates reaching an agreement with Ormat Nevada, Inc. a Delaware Corporation, a geothermal facility in which the District will sell at cost (or markup) all treated effluent to Ormat. The agreement between the two parties is mutually beneficial as the District may be able to reduce or eliminate effluent discharge into a downstream receiving water and thus, would not need to meet the stringent regulations related to effluent discharge regulations under its National Pollutant Discharge Elimination System (NPDES) Permit from the Page | 56 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 Regional Water Quality Control Board. A successful Agreement between the District and Ormat would require that all of the treated effluent be channeled to Ormat. It may be necessary to further treat the secondary effluent prior to transmitting the treated (in accordance with Ormat requirements) effluent to Ormat. This would benefit Ormat as it would be a secure, source of water to operate its geothermal energy facility. Phasing of Wastewater Treatment Plant and Sewer Collection Facilities The recent, 2013 wastewater treatment plant expansion project provides an average daily flow capacity of 1.2 MGD. If development occurs at the same pace it has in the past seven years, there would be plenty of capacity until 2040 as shown in Table 4-E. This assumes that growth would continue at 2.71% per year and that it be predominantly attributed to residential development. It also assumes flows of 100 gallons per person per day. Heber’s actual discharge is much lower, likely attributed to water conservation measures, thus Table 4-F assumes worst case scenario for wastewater treatment demand. Table 4-E Wastewater Demand Based on Historic Growth Rate Projected Total Wastewater Percent Year Population Demand Capacity 2020 7,562 0.75 MGD 63% 2025 8,645 0.89 MGD 74% 2030 9,885 0.99 MGD 83% 2035 11,303 1.13 MGD 94% 2040 12,923 1.29 MGD 107% Assumes 100 gallons/day per person of wastewater generation Design would have to occur in 2030 and upgrades will have to begin within 2-3 years thereafter. It should be noted that Table 4-F is a more likely scenario but it only examines residential growth as there has been consistent residential data to rely on. Non-residential growth has been erratic but can significantly affect demand on the wastewater system. For instance, buildout of the remaining 13.9 acres at Imperial Center can generate an additional 27,761 gallons of wastewater flow into the system. Upgrades to the wastewater treatment plant would have to be designed shortly thereafter. Wastewater System projections should take into account not only residential service demand, but non-residential service demand which as previously noted is referred to Equivalent Dwelling Units (EDU’s). In the unlikely scenario that all residential and non-residential, infill, planned, and approved development is built Page | 57 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 out during the 20-year planning horizon, it is expected that the 1.2 MGD Wastewater Treatment Plant will reach capacity by the year 2023 using the flow demand of 391 gallons per EDU. Table 4-F illustrates the projected phased expansions that may transpire according to the level of development which occurs. This assumes that 247 EDU’s are built annually and Imperial Center is completed by the year 2025 which is an unlikely and aggressive growth projection. Table 4-F Wastewater Buildout Demand Total Wastewater Year EDU’s Demand Percent Capacity 2020 2,526 0.99 MGD 82% 2025 3,761 1.50 MGD 125% 2030 4,997 1.99 MGD 165% 2035 6,232 2.46 MGD 205% 2040 7,467 2.95 MGD 246% Assumes 391 gallons/day per EDU of wastewater generation The Regional Water Quality Control Board generally requires agencies to begin engineering design at 80% capacity and begin construction at 90% capacity. If development ramps up again at fast pace, and if all developable parcels in Heber are built within the next 20 years, HPUD will need to start the design process some time in 2019 and start construction in 2021. Mitigation for Wastewater Treatment Plant and Sewer Collection Facilities Heber Public Utility District was successful in obtaining funding and completing the construction project for the rehabilitation and expansion of the WWTP to meet the immediate wastewater treatment demand through 2020 and easily accommodate expansions thereafter. Capital improvements to wastewater collection pipelines may be necessary to replace aging infrastructure. The following mitigation measures are recommended: S-1 The District should continue to pursue various means by which to obtain funding and provide for adequate wastewater collection/conveyance facilities for the existing and future residents of the District. S-2 New Development shall continue to be held responsible for constructing adequate wastewater collection system facilities and fair share costs for wastewater treatment facilities. Page | 58 Heber Public Utility District Service Area Plan WWTP and Sewer Collection Facilities January 2018 S-3 The District shall ensure that a Service Agreement be in place, prior to the annexation of new development and that any “Will-Serve” letters have a sunset or expiration clause if construction is delayed. S-4 The District shall develop a Master Plan for the continued improvements of its Wastewater Treatment and Collection facilities. Page | 59 Heber Public Utility District Service Area Plan Water Facilities January 2018 4.1.4 WATER TREATMENT AND DISTRIBUTION FACILITIES The District owns, operates and maintains a system for the treatment, distribution and storage of potable water resources that serves a population of 6,979 residences, businesses, and public facilities within the District and the District’s Sphere of Influence. Additionally, the HPUD entered into an Agreement with the City of El Centro, as approved by LAFCO, to provide services outside of the HPUD Sphere of Influence and into the El Centro Sphere of Influence for the purpose of providing potable water services to McCabe Cove and Magnolia Gate. The District purchases all of its untreated water from the Imperial Irrigation District, which is conveyed to HPUD facilities via IID’s Dogwood Canal Gate 37A and via a 36-inch diameter raw water pipeline extending from the Central Main Canal approximately 1.8 miles from the Water Treatment Plant. Water treatment and distribution facilities are owned and maintained by the Heber Public Utility District. Performance Standard for Water Facilities Although the Heber Public Utility District does not have an adopted performance standard for Water facilities, there are design criteria that must be met to ensure that adequate potable water supply and fire flow needs are provided. In 2004, Heber Public Utility District adopted Standard Details and Specifications for the installation of water distribution pipelines. Potable water must further meet or exceed water quality standards established by the California Department of Health Services and the US Environmental Protection Agency. HPUD’s goal in the operation and maintenance of its water facilities is to provide adequate potable water service to every customer. The California Department of Public Health requires that specific system pressures be maintained under normal and peak demand conditions. The design criteria are based on Maximum Day Demand (MDD) plus fire flow. The potable water system must be able adequately treat and provide 200 gallons per person per day as well as fire flow. The criteria outlined under Table 4-G, that follows, considers adequate water pressure for service to customers in addition to technical specifications that assure a properly designed system. The treatment plant capacity shall further meet the demand of the maximum daily flow, plus provide an operational storage capacity of at least 25 percent of the maximum day demand used. Page | 60 Heber Public Utility District Service Area Plan Water Facilities January 2018 Table 4-G Water Flow Standards Flow Demand Maximum Velocity Pressure Level Maximum Day Demand + Fire 15.0 ft per second 20 psi - 35 psi Flow* Maximum Day Demand 7.0 ft per second ≥ 20 psi *Fire flow minimums are targeted at 1,200 GPM for residential, 2,000 GPM for commercial, and 2,500 GPM for industrial. Inventory of Existing Water Facilities Water Treatment Facilities- The District currently owns a Water Treatment Plant (WTP) with a water treatment system capacity of 4.0 million gallons per day (MGD) which was recently constructed in 2017. The WTP is located at 1085 Ingram Avenue within the townsite of Heber. The WTP mainly consists of the following components: Raw Water Transmission Line- HPUD owns and operates a Raw Water Transmission Pipeline that will continuously feed the WTP up to 7 MG of raw water per day. Aside from the continuous flow of raw water from the Raw Water Transmission Pipeline, the water treatment plant’s raw water storage consists of three (3) raw water pre-sedimentation basins. The total raw water storage capacity for all three basins is 22.4 acre-feet or approximately 7.3 MG. Each of the basins has a different capacity. Basin 1 has a capacity of 7.0-acre feet (2.28 MG); Basins 2 has a capacity of 6.78-acre feet (2.21 MG) and Basin 3 (2.79 MG) has a capacity of 8.56-acre feet. Basin 1 and 3 are concrete-lined; whereas, Basin 2 is lined with High Density Polyethylene Line. Static Mixer Facility receives raw water from the Imperial Irrigation District’s (IID) Dogwood Canal and/or Central Main Canal. The Static Mixer Facility has two (2) 18” inline static mixers. Each mixer is capable of blending coagulants into the raw IID water for flows from 1 to 4 MGD. Recycled settled backwash water will also be treated at this facility. Water will be conveyed to the existing three (3) downstream Raw Water Storage Basins from the Static Mixer Facility via gravity pipelines install in 2017. Raw Water Pump Station was constructed in 2017 and consists of a wet well and three (3) variable speed vertical turbine pumps. Two pumps are duty pumps capable of pumping up to 4 MGD to the Clarifier/Filter Treatment Units and one pump is a standby variable speed pump. Each pump has a capacity of 2 MGD. Water will be conveyed to the new and existing Clarifier/Filter Page | 61 Heber Public Utility District Service Area Plan Water Facilities January 2018 Treatment Units from the Raw Water Pump Station via new force-main pipelines. Clarifier/Filter Treatment Units- two (2) existing 2 MGD Treatment Units are in place. Two units will normally operate, and one will remain on standby. The new and existing units are self-contained, complete with treatment units including clarifier flush and filter backwash piping, valves and controls. Treated water will be conveyed to the expanded Finish Water Transfer Pump Station from via new gravity pipelines. Filter backwash and clarifier flush water will be conveyed by gravity to the existing Filter Backwash Settling Basins. Finish Water Transfer Pump Station consists of one (1) new and two (2) existing constant speed vertical turbine pumps. Each pump has a capacity of two (2) MGD. Two (2) constant speed pumps will normally operate while one constant speed pump will be on standby. Water will be conveyed to the three (3) existing ground storage reservoirs from the Finish Water Transfer Pump Station via piping. In general, all the discharge is directed to the 0.75 MG reservoir. Chlorine is injected in the finished water force main. High Service Pump Station was constructed in 2017 and consists of four (4) variable speed centrifugal pumps. Each pump is capable of pumping 1,500 gpm at 80 psi. Up to three (3) pumps will normally operate to supply up to 4,500 gpm to the distribution system with one pump will remaining on reserve for additional peak flow demand and redundancy purposes. The new High Service Pump Station potable water is connected to the HPUD Distribution System via new and existing pipelines. Sodium Hypochlorite Disinfection system was retrofitted in 2017 and expanded. Sodium Hypochlorite is injected into a new forcemain pipeline downstream of the Finish Water Transfer Pump Station. Clarifier/Filter Units Backwash Pump Station conveys water from the Finish Water Storage Reservoirs to the two (2) existing and one (1) new Clarifier/Filter Treatment Units for backwash purposes via new forcemain pipelines constructed in 2017. Backwash water will continue to be conveyed to the existing Backwash Basins from the Clarifier/Filter Treatment units via new and existing gravity pipelines. Backwash Decant Pump Station was constructed in 2017 to manage the filter backwash and clarifier flush water after settling in the Backwash Basins. The effluent is pumped to the new static mixer and chemical feed facility at the point where raw water is received from the IID canals. The variable speed 3 hp submersible pumps and 4 and 6 inch force mains will allow the operators to pump the recycled backwash water at a flow rate (100 – 300 gpm range) that Page | 62 Heber Public Utility District Service Area Plan Water Facilities January 2018 does not exceed 10% of the volume of water entering the plant from the IID canals. A turbidity and flow meter will monitor the recycle water. Three (3) Finished Water Storage Reservoirs were constructed to allow the reservoirs to operate in series with flow from the Finished Water Pump Station entering the 0.75 MG reservoir. The outlet from the 0.75 MG reservoir is piped to the inlet to the 1.7 MG reservoir. The outlet from the 1.7 MG reservoir is piped to the 3.0 MG reservoir. The pipe sizes and connections to the reservoirs allow the entire plant capacity to flow from tank to tank, for series operation. Water Distribution Facilities- The potable water distribution system consists of approximately 135,000 linear feet (25.5 miles) of pipeline. Of the total water pipelines in the network, there is approximately 8,500 linear feet of 4-inch diameter asbestos cement pipe, 5,080 linear feet of 6-inch diameter asbestos pipe, 64,800 linear feet of 8-inch diameter PVC pipe, 10,130 linear feet of 10-inch diameter PVC pipe, 35,000 linear feet of 12-inch diameter PVC pipe, 1,000 linear feet of 18-inch diameter PVC pipe, and 2,450 linear feet of 20-inch diameter PVC pipeline. The PVC pipe has been installed since the mid and late 1980's. The normal operating pressure of the distribution system is between 50 to 55 pounds per square inch (psi). (Refer to Exhibit 4-F – Heber Public Utility District Existing Water Distribution System). Adequacy of Existing Water Facilities Water Treatment Plant The WTP’s capacity was 2.0 MGD but underwent a recent expansion that was finalized in 2017. Prior to the expansion, the average day demand for the Heber Public Utility District was 1.2 MGD and the maximum day demand for water was recorded at 2.246 in 2006, exceeding the Plant’s capacity. Thus, the water treatment plant was considered “under capacity.” Based on the findings of the Preliminary Engineering Report prepared in January 2008, the District commissioned the design and Construction of a Water Treatment Plant Expansion project. The Water Treatment Plant Expansion was within the existing site and incorporated two 2.0 MGD pre-packaged units for a maximum capacity of 4.0 million gallons/day. The average daily demand to the Water Treatment Plant in 2016 was 1.136 million gallons/day with a maximum demand of 1.754 million gallons/day. The 2017 logs documented similar average daily demands of 1.142 million gallons/day with a maximum of 1.715 million gallons/day. Thus, the plant is operating just under 50 percent of its current capacity. Page | 63 Heber Public Utility District Service Area Plan Water Facilities January 2018 Page | 64 Heber Public Utility District Service Area Plan Water Facilities January 2018 Water Storage In 2009, a 36-inch diameter pipeline replaced an existing 18-inch diameter PVC pipeline to convey 7 MGD of raw water from the IID’s Dogwood Canal to the Raw Water Basins. The State of California was requiring that the District have a raw water storage capacity of six (6) days. This would have been equivalent to 12,000,000 gallons of raw water storage. The District was deficient 4,700,000 gallons with respect to raw water supply at the 2 MGD capacity. The District faced two options: construct additional raw water storage basins or construct a portable raw water pump station and transmission pipeline from Imperial Irrigation District Central Main Canal to the District’s Water Treatment Plant. The Central Main Canal is almost never taken out of service and was therefore, considered a reliable water source. The District chose the latter option and constructed a potable raw water pump station to meet the State’s raw water storage demands. Water Distribution Pipelines As previously noted, the potable water distribution system consists of approximately 25.5 miles of pipeline. Due to the age of infrastructure there are a small number of capital improvements necessary. The primary need is associated with meeting future demand at adequate capacity levels including levels to accommodate fire flow standards. Inventory of Approved Water Facilities No major capital improvements are planned for the water treatment facility. However, there are a number of planned water distribution pipeline extensions. Exhibit 4-G provides a delineation of water line extensions planned within the Heber Public Utility District and/or Service Area. The planned water line extensions are to accommodate new growth. New backbone water distribution pipelines serving new development projects are typically borne to developers in whole or as fair share of costs. Capital projects in the near-term are associated with existing water distribution pipelines and the need to improve their capacity and/or fire flow. Capital improvements within the planned horizon include the following: • Water Distribution Residential Pipeline Relocations-The system contains three segments of 4” and 6” diameter water distribution pipelines which are located across Valley Boulevard and in private property and will need to be capped or relocated to loop within a public right-of-way in order to accommodate proper operation and maintenance. It is estimated that up to 1,000 lineal feet of 6” diamter pipeline may need to be replaced and relocated. The project is estimated at $120,000. Page | 65 Heber Public Utility District Service Area Plan Water Facilities January 2018 Page | 66 Heber Public Utility District Service Area Plan Water Facilities January 2018 • Water Distribution Pipeline Looping for Increased Fire Flow- There are several segments of the water distribution that dead end or are undersized and unable to meet adequate fire flow standards as infill development and new growth occurs. These pipeline segments need to be looped at key locations throughout the City. It is estimated that key replacements will cost an estimated $980,000. • Water Main Pipeline Capacity Increase-There is an existing 8” diameter pipeline along Rockwood Avenue between Correll Road and 6th Street that serves as a primary transmission line. The pipeline is not adequate in size to accommodate future growth and is slated to be replaced with a 20” diameter pipeline. The total length of the proposed replacement is approximately 800 lineal feet at an estimated cost of $184,000. Buildout Demand for Water Facilities The recent, 2017 water treatment plant expansion project provides an average daily treatment capacity of 4 MGD. If development occurs at the same pace it has in the past seven years, the water treatment plant would be at 40% capacity in 2040. This assumes a water demand of 125 gallons per person per day. Since there would be plenty of capacity in the historic growth rate scenario, no further analysis was conducted. However, in a total buildout scenario where all developable parcels are built out during this Service Area Plan’s planning horizon, there would be an additional 5,682 equivalent dwelling units (EDU’s). Capacity would be reached just after 2040. As with the wastewater treatment plant, design should commence once 80% capacity is reached. This would occur sometime after 2030 and construction should commence shortly thereafter, ideally prior to reaching 90% capacity. Table 4-H Buildout Demand for Water Treatment Plant Year EDU’s Total Water Demand Percent Capacity 2020 2,526 1.5 MGD 37% 2025 3,761 2.1 MGD 53% 2030 4,997 2.7 MGD 69% 2035 6,232 3.3 MGD 84% 2040 7,467 3.9 MGD 99% Assumes an EDU of 488 gallons per day or 125 gallons/day per person of water demand due to conservation efforts. The Heber Public Utility District would be expanding using the Microfloc Trident Water Treatment Units which are often referred to as “packaged treatment Page | 67 Heber Public Utility District Service Area Plan Water Facilities January 2018 systems.” The packaged water treatment systems are pre-assembled prior to delivery to a given water treatment plant. The packaged water treatment systems are purchased and delivered at a designated treatment capacity. The TR840A Microfloc Trident Water Treatment Units are designed to treat 2.0 MGD. Thus, the District will be upgrading the water treatment plant in 2.0 MGD pre-packaged units gradually, as water demand increases. Opportunity for Shared Water Facilities The District does not share water treatment, storage, or distribution facilities with other Districts or jurisdictions. The El Centro Water Treatment Plant is located at an approximate five miles of the Heber Public Utility District’s Service Area. El Centro’s Water Treatment Plant at the time of preparation of this plan did not have sufficient capacity to serve the District’s entire service area. However, there is an opportunity to inter connect with the City of El Centro water distribution system at Fransworth. Calexico is the next closest community at approximately 5 miles from the Heber Townsite which is unreasonable distance for shared facilities. Phasing of Water Facilities A second expansion would be necessary by year 2035 based on the projected population growth. The second proposed expansion to the wastewater treatment plant will increase capacity from 4.0 MGD to 6.0 MGD and be able to serve the projected growth beyond 2035. Mitigation for Water Facilities The Heber Public Utility District has been successful in securing funding to complete the Water Treatment Expansion Project and maintain a steady revenue stream for operation and maintenance. The following are additional mitigation measures recommended: W-1 The community of Heber should continue to pursue various means by which to obtain funding or access resources for the capital improvement needs of the Water Treatment Facilities and Distribution System to accommodate both the existing and future residents of the District. W-2 The District should develop a Master Plan to adequately program capital improvement needs in its aging distribution system. Close attention should be placed on adequacy of fire flow pressures throughout the District. W-3 The District shall further ensure that a Service Agreement be in place, prior to the annexation of new development and that any “Will-Serve” letters have a sunset or expiration clause if construction is delayed. Page | 68 Heber Public Utility District Service Area Plan Water Facilities January 2018 4.1.5 SOLID WASTE SERVICES AND FACILITIES Heber Public Utility District outsources solid waste services. In October 2011, the Heber Public Utility District approved a resolution authorizing the transfer of the franchise agreement from Palo Verde Valley Disposal Service to CR&R Incorporated for the collection, transportation, recycling and disposal of solid waste, recyclable and compostable materials (Resolution 2011-14). The terms of the agreement between Heber Public Utility District and CR&R run from July 1, 2010 through and including June 30, 2017. Resolution 2016-2 extended the agreement to 2024. The solid waste service fee from CR&R, in addition to an administrative fee for collection services, is included with the utility bill for water and sewer services from HPUD. Residents within the service area are provided with receptacles recyclables, green waste and trash. CR&R disposes the solid waste collected in Heber at the Allied Waste Landfill, located within an unincorporated area of Imperial County near the City of Imperial. Performance Standards for Solid Waste Services The contract between CR&R and Heber Public Utility District includes Customer Service Performance Standards. Some of the performance standards include, maintaining a computer account system, having a representative to serve as a liaison between the District and CR&R, a policy regarding customer complaints and other minimum standards. The State also regulates solid waste via laws such as the California Integrated Waste Management Act which requires solid waste reduction, recycling and composting and environmentally safe transformation and land disposal. Inventory of Solid Waste Facilities As stated earlier, CR&R disposes of collected solid waste at the Imperial Allied Waste Landfill, a privately-owned landfill, located at 104 East Robinson Road, within an unincorporated area, east of the City of Imperial. The landfill was recently expanded and has a disposal acreage of 162 acres and an expected closure date of December 31, 2040. Waste collection companies can decide to take solid waste to different landfills based on proximity, landfill tipping fees, daily permitted disposal limits, and other factors. CR&R can decide to deposit solid waste at any of the nine landfills in the county: Calexico Landfill, Holtville Landfill, Hot Spa Landfill, Imperial Landfill, Niland Landfill, Ocotillo Landfill, Palo Verde Landfill, Picacho Landfill, and Salton City Landfill. Niland, Calexico, and Hot Spa Landfills have the largest remaining capacities with closure dates for Niland in 2020, Calexico in 2022 and Hot Spa in 2036. Estimated closure dates is based on site capacity and the daily permitted rate of disposal. Page | 69 Heber Public Utility District Service Area Plan Water Facilities January 2018 Adequacy of Solid Waste Services and Facilities The current demand for solid waste facilities is based on the collection of solid waste by CC&R. An estimated 2,788 tons of solid waste are collected annually from the Heber community. Existing solid waste facilities are adequate, and no additional facilities are necessary. As development occurs, developers are required to ensure that solid waste facilities are adequate and in place before any new development is approved. Given that the Imperial Landfill was recently expanded, there are adequate solid waste facilities. Inventory of Approved Solid Waste Facilities Construction of the Mesquite Regional Landfill was completed in 2011 east of the development corridor of Imperial County. The landfill was designed as a sanitary landfill to meet all local, state and federal requirements with a capacity of 600 million tons and a projected life of approximately 100 years. The site is permitted to receive up to 1,000 tons per day by truck from Imperial County. As a result of the economic recession in 2008 and increased recycling in California, the amount of waste requiring disposal has significantly gone down since the completion of the Mesquite Regional Landfill. As such, operation of the landfill has yet to commence. Use of the facility is available should the demand arise. Buildout Demand for Solid Waste Facilities and Services The construction of the Imperial Center, McCabe Ranch II and Mosaic combined will increase the demand for solid waste services. However, the expansion of the Allied Waste landfill will be able to support the additional demand, and there are other landfills in the area that can accommodate the demand should the need arise. Opportunity for Shared Solid Waste Services and Facilities The Imperial Landfill is a shared facility by many other jurisdictions in Imperial County. Phasing of Solid Waste Facilities CR&R is not in the process of constructing additional solid waste facilities to support the demand created by the Heber Public Utility District. Mitigation for Solid Waste Facilities No mitigation measures are required given that CR&R is meeting Heber Public Utility District’s performance standards. Page | 70 Heber Public Utility District Service Area Plan Fire Facilities January 2018 4.2 SERVICES PROVIDED BY IMPERIAL COUNTY Given that the services provided by Heber Public Utility District are limited, and that the District lies within an unincorporated area of Imperial County, there are numerous services provided by the County of Imperial including Administration, Fire Protection, Law Enforcement, Library Facilities, Transportation Facilities, Stormwater/Drainage Facilities, and Parks and Recreation. Administration Facilities and Parks and Recreation Facilities provided by Imperial County have already been discussed in Sections 4.1.1 and 4.1.2 of this Service Area Plan and will not be discussed further in this section. More detailed information regarding Imperial County administrative and recreational services is available in the Imperial County Municipal Service Review and can be accessed through Imperial County’s LAFCO or Imperial County’s Website. The sections that follow discuss services that are directly provided by Imperial County within the Heber Public Utility District and Sphere of Influence. The data collected for this discussion was obtained from Imperial County’s Service Plan, prepared by Hofman Planning and Engineering. A cursory review is being provided for these services under this Service Area Plan Section.5 • Fire Facilities- Fire facilities include the fire station, and other support equipment including firefighting equipment such as fire engines, and water tenders. Fire facilities also include the staffing level needed to operate the aforementioned equipment and deliver emergency and fire-protection services. • Law Enforcement Facilities- Law enforcement facilities include the sheriff’s station, and other support facilities including patrol vehicles, the Imperial County jail, and the Coroner’s office. Law enforcement facilities further includes the staffing level needed to provide law enforcement and protection services. • Library Facilities- Library Facilities include the library space in the Heber Community Center, the contents of the library as well as the Staff that manage the library. It also includes any support equipment such as computers, copy machines, and other office equipment that may be available to the general public. • Transportation facilities- Transportation facilities consist primarily of roadways including Local and State-owned roadways. Transportation facilities may also include pedestrian and transit facilities such as sidewalks, crosswalks, and bus shelters. 5 Although the Imperial County Municipal Service Review has been under review by Imperial County since January 2011, as of June 2012, Imperial County has not commented on the document. As such, the Municipal Service Review has not been and adopted by LAFCO. Page | 71 Heber Public Utility District Service Area Plan Fire Facilities January 2018 • Drainage Facilities- Drainage facilities are those that convey water runoff to minimize the occurrence of flooding situations, especially during storm events. These include curb and gutter along streets, catch basins within improved developments, retention basins, and canal drains. Drainage facilities on occasion may include pump stations. Page | 72 Heber Public Utility District Service Area Plan Fire Facilities January 2018 4.2.1 FIRE FACILITIES Fire protection services are provided to the Heber community by the Imperial County Fire Department (ICFD). The ICFD maintains and operates five (5) fire stations throughout the County of Imperial. Heber is serviced by Imperial County Station #2 located at 1078 Dogwood Road, at the Heber Essential Services building constructed in 2004. Performance Standard for Fire Facilities A general standard for fire facilities is 1 firefighter per 1,000 persons. This standard is typically utilized by jurisdictions that are similar in geographic area to Imperial County, yet given the nature of the County this ratio is inappropriate. Given the County’s vast area and geographic challenges a standard based solely on population is insufficient. Therefore, the level of service standard for each station was based on the following criteria: staffing, adequacy of facilities, and response time. The Heber Station is operated by County employees. However, they have a volunteer program through the One-Stop Business and Employment Center where volunteers assist at the Fire Station and augment the daily duties of the Station, but they do not serve as firefighters. Only paid Imperial County staff respond to emergency calls. Inventory of Existing Fire Facilities Station #2 in Heber is the newest fire station within the County, constructed in 2004, and acts as the Office of Emergency Services headquarters. The station sits on 1.8 acres and is situated within a 15,000 square foot building. Existing equipment at the station includes one (1) Type I engine, one (1) aerial ladder (75’ Quint), and one (1) Hazardous Materials Unit. There are two (2) firefighters per shift, including one (1) captain. Their average response time is 7.5 minutes for the entire service area which encompasses 148 square miles. These ratios of service and response are reasonable and acceptable. Please Refer to Exhibit 4-H – Imperial County Fire Station Location and Service Area, for the service area. Adequacy of Existing Fire Facilities The most recently adopted Service Area Plan (2011 Draft) for Imperial County identified the existing fire facilities as adequate given the terrain and geographic challenges of Imperial County. The Heber fire facility, which serves the entire District, was found to meet all the current code requirements, and according to the Fire Chief of the County of Imperial, the existing staffing levels are sufficient based on the current demands and average response times. The average response time for the Heber Public Utility District service area is further enhanced given the immediate proximity of Fire Station #2 to the Heber community. Page | 73 Heber Public Utility District Service Area Plan Fire Facilities January 2018 Page | 74 Heber Public Utility District Service Area Plan Fire Facilities January 2018 Inventory of Approved Fire Facilities There are no additional fire facilities planned for the Heber community as the current facility is less than 13 years old, however, land has been set aside in the East Gateway area of the County for a future fire station. Currently, Fire Station #2, which serves the Heber area as well, serves the East Gateway area. If a new fire station is constructed, it is expected that response times would improve for the Heber community. The new fire station would be approximately 15,000 square feet and will be situated on a 2 acre site. In addition to the East Gateway area fire station, there are no specific plans at this time that identify the development of additional stations. Buildout Demand for Fire Facilities and Services The expansion of existing stations may be necessary in the future as development increases. The need for expansion will be based on staffing levels at each of the respective stations. Currently, there are two (2) firefighters per shift. Thus, the stations must be able to accommodate sleeping and living quarters for the staff. If call volumes increase such that additional staff is required per shift, additional square footage may be needed to accommodate additional sleeping and living quarters to meet Fire Safety Codes. Opportunity for Shared Fire Facilities The Imperial County Fire Department currently shares facilities with other agencies. The Imperial County Fire Department shares Station #2 with the Sheriff’s Office, Heber Public Utilities District Staff and the Sherriff’s Activity League. Phasing of Facilities There are currently no new facilities planned within the Heber Public Utility District Sphere of Influence. However, land has been set aside for a fire station near the East Gateway area of Imperial County. The station that currently serves the Heber Public Utility District’s service area would greatly benefit from a fire station near the East Gateway area given that service ratios would improve to Station 2’s service area. Page | 75 Heber Public Utility District Service Area Plan Fire Facilities January 2018 Mitigation for Fire Facilities The Imperial County Fire Department is responsible for the continuous monitoring of the adequacy of the existing Imperial County Fire Department facilities to ensure that adequate fire protection services are provided. The following is a mitigation measure recommended for the District for proper fire protection services: F-1 The Heber Public Utility District shall continue to coordinate and ensure that the Imperial County periodically monitor and improve existing distribution line for adequate fire flow suppression and fire hydrant adequacy throughout the District. F-2 The HPUD shall make sure the Fire Department has cleared all planned water distribution improvements as it relates to proper fire flows and suppression capabilities. Page | 76 Heber Public Utility District Service Area Plan Law Enforcement Facilities January 2018 4.2.2 LAW ENFORCEMENT FACILITIES Law enforcement services are provided to the Heber community by the Imperial County Sheriff’s Department. The nearest sheriff station to the Heber population is located at 328 Applestill Road in El Centro which is the main headquarters. The Sheriff’s Department provides services to the entire unincorporated areas of Imperial County with an estimated population of 40,087 persons in 2017 (population according to the California Department of Finance). Services include patrol, criminal investigations, civil services, bailiff enforcement, correctional services, crime preventions, off-highway law enforcement, waterway enforcement, and dispatch services. The Sherriff’s Department only provides service to the unincorporated County population as Cities have their own police departments, unless there is a mutual agreement in place. This section will discuss patrol services provided to the Heber community by Imperial County only. Performance Standard for Law Enforcement Facilities The FBI previously identified a ratio of one (1) sworn officer for every 1,000 persons, but this ratio is only a starting point for determining actual performance standards. Population density, geographical characteristics, terrain, and other factors play a role in determining proper staffing levels. Given the rural nature of Imperial County and the fact that the unincorporated population centers are spread out over vast distances, the ratio of patrol officers to population numbers is more important than the ratio of sworn officers. The Imperial County Sheriff’s Office determined that a ratio of 1.43 patrol officers per 1,000 persons (p.44 of IC 2011 Draft SAP) was an adequate service ratio. Inventory of Existing Law Enforcement Facilities The sheriff’s administrative facility is approximately 23,274 square feet and is responsible for civil services for the entire County of Imperial. In addition to the main quarters, there are four (4) substations located in Brawley, Niland, Salton City, and Winterhaven that serve as bases for patrol. Staffing of the Sheriff’s Office includes sworn and non-sworn positions. The Sheriff’s Office has 99 sworn officers which is comprised of 1 sheriff, 1 undersheriff, 2 chief deputies, 3 sheriff lieutenants, 21 sheriff sergeants, 32 senior deputy sheriffs, and 39 deputy sheriffs. There are also an additional 94 administrative and support staff. The sheriff’s office operates on two 12-hour shifts over four patrol areas. For each shift there are 12 patrol officers and there is a total of 4 shift teams. These patrol areas are divided as follows, South County, North County, Winterhaven, and Salton City. The Heber community is patrolled by South County. The South County patrol includes areas such as Ocotillo, Seeley, Heber, and the unincorporated areas of Calexico, El Centro, Imperial and Holtville. Page | 77 Heber Public Utility District Service Area Plan Law Enforcement Facilities January 2018 Adequacy of Existing Law Enforcement Facilities The nearest Sheriff’s office is located at 328 Applestill Road in El Centro at an approximate 3.4 mile distance from Heber Public Utility District. (Please refer to Exhibit 4-I – Law Enforcement Location Map). The Sheriff’s Office is able to meet its current response time standard of 8 minutes to the community of Heber. However, there is a deficiency in the number of patrol officers to service all of Imperial County. The current population of all unincorporated areas is 40,087. At a ratio of 1.43 patrol officers per 1,000 population, the current demand is 57 officers (40,087 person ÷ 1,000 x 1.43 = 58 officers). There are currently 48 deputies on patrol spread over 4 shifts at 12 deputies per shift. There is a deficit of 10 patrol deputies. Based on input from the Sheriff’s Office, the staffing shortage should be addressed by hiring 6 deputies and 2 sergeants (County of Imperial Municipal Service Review Draft #3, 2011). Inventory of Approved Law Enforcement Facilities Although Imperial County’s Service Area Plan does plan on additional substations throughout high demand unincorporated areas, no additional law enforcement facilities are planned for within the Heber Public Utility District or its Sphere of Influence. Buildout Demand for Law Enforcement Facilities and Services There are no new law enforcement facilities planned within the Heber Public Utility District Sphere of Influence within the next twenty years. However, it is noted in the Imperial County Service Area Plan that a law enforcement substation be considered for the Gateway Specific Plan project area by 2030 to meet the projected demand. The development of such a substation may alleviate some of the shared demand. Opportunity for Shared Law Enforcement Facilities The Imperial County Sherriff shares a facility at the Heber Essential Services Building along with the Imperial County Fire Department, the County Library Station and Heber Public Utilities District Administration staff. Page | 78 Heber Public Utility District Service Area Plan Law Enforcement Facilities January 2018 Page | 79 Heber Public Utility District Service Area Plan Law Enforcement Facilities January 2018 Phasing of Law Enforcement Facilities No new law enforcement facilities are planned during this 20-year period within the Heber Public Utility District Sphere Influence nor within any proximity that would impact the service ratio to HPUD. Mitigation for Law Enforcement Facilities Periodic evaluations of law enforcement services are the responsibility of the Imperial County’s Sheriff’s Office. Evaluations should base service demand on not only population growth projections but incidents of crime, and emergency response times. Page | 80 Heber Public Utility District Service Area Plan Library Facilities January 2018 4.2.3 Library Facilities The Heber Public Utility District receives library services from the Imperial County. The Imperial County Free Library system consists of four branches open to the public which are located in Calipatria, Holtville, Niland, Salton Sea and a headquarters building in El Centro. Although Heber does not have a branch, it has a station as the library does not meet the “branch” definition requirements established by the California State Library. Performance Standard for Library Facilities The Imperial County Free Library does not have adopted performance standards for library facilities and the State Library system has not created standards. However, the State Library has definitions that provide a basis for facility needs and services. The County librarian provided the following information from the State Library: • Library Branch- “A branch is an extension library, open at least five days a week, has at least 1,400 square feet of floor space, a general book collection of at least 7,000 volumes and staffed with at least one (1) librarian and one clerical employee during the hours open for service.” • Library Station- “A station is a smaller version of a branch with one (1) separate quarters, a permanent basic collection at least one established paid position and a regular schedule for opening to the public.” The American Library Association, Subcommittee on Standards for Small Libraries published a brief 16-page report in 1962 outlining minimum space requirements for libraries serving population of less than 50,000. The report recommends that a 2,000 square-foot library is adequate to serve a population of under 2,499. The location of a library is also an important performance standard. The American Library Association recommends that patrons should be able to reach the library within 30 minutes travel in rural and suburban areas. Inventory of Existing Library Facilities The Heber Library Station (Imperial County Free Library) is approximately 408 square feet. and Although it is labeled as a branch, it does not meet the 1,400 square feet size requirement to be considered a branch. The library is ADA accessible. Services at the Heber location include a paperback exchange, reference services, interlibrary loan, three (3) public access computers, wireless internet access, printing, and a summer reading program. In addition, the library station is supportive of the School’s Reading Count Program and Accelerated Reader Page | 81 Heber Public Utility District Service Area Plan Library Facilities January 2018 Program. Among the programs available at the library station additional services are provided on an as requested basis, such as, adult literacy and English as a Second Language (ESL) tutoring. Computer and equipment available at the branch include the following: • Two Public Use Computers with Internet Access • One Laptop for Public Use • One Copy Machine for Public Use • One Printer for Public Use The library station is operated by an Imperial County Library employee. Approximately two (2) or three (3) library personnel assist the Heber library station on an as needed basis. The additional personnel are present at the site approximately two hours a week throughout the summer time. Library Facilities Location The Heber station, is located at 1132 Heber Avenue, Heber, California, collocated with the Heber Community Center. The hours of operation are Mondays 9:00 a.m. to 6:00 p.m., Tuesdays 10:00 a.m. to 7:00 p.m. and Thursday 9:00 a.m. to 6:00 p.m. The library closes between 1:00 and 2:00 for lunch and is no longer open on Saturdays. These times do not change during the summer months. Adequacy of Existing Library Facilities Although the existing Library Station relocated to a slightly larger space, it is important to note that the service levels are inadequate due to the limited number of hours that the Station is open to the public. The library in the neighboring City of El Centro is available to the residents of Heber but its distance is not easily accessible to Heber, especially to school-aged children. As the community of Heber continues to grow, it may be necessary to plan for increased hours or for a full service Library Branch. Inventory of Approved Library Facilities There are no planned, or approved, library facilities beyond what is available currently to the Heber Community through Imperial County Library Services. The current facility would further be able to accommodate an increase in demand by extension of service hours open to the public. Page | 82 Heber Public Utility District Service Area Plan Library Facilities January 2018 Buildout Demand for Library Facilities It is very likely that as the community grows within the next 20-year Planning Term, at minimum the hours of operation for the Heber Library Station will be extended, but will not result in a demand for new facilities. Opportunity for Shared Library Facilities The Heber Library Station is currently collocated with the Heber Community Center. The library facility was previously located within the Heber Essential Services Building which houses the fire station, District administrative offices, and Sheriff’s warehouse space. There is no room for growth within the Heber Essential Services Building. Phasing of Library Facilities There is no need for additional library facilities during the planning period. Mitigation It is the responsibility of Imperial County to assess the library service demand in unincorporated areas. The last SAP developed by Imperial County was in 2011 and remains as an un-adopted draft. Page | 83 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 4.2.4 TRANSPORTATION FACILITIES Given that the Heber Public Utility District area is within an unincorporated area of Imperial County, the information contained in this section is based on Imperial County’s Circulation & Scenic Highways Element which was last updated in 2008. Heber’s roadways and pedestrian facilities are maintained by the Imperial County Public Works Department with the exception of Main Street/Highway 86 and Highway 111, which are State Routes maintained by Caltrans. Performance Standard for Transportation Facilities The Circulation and Scenic Highways Element for the Imperial County has established a threshold of performance standards for the road segments located in the Heber Public Utility District area. The Circulation Element identifies criteria upon which roadway capacity and flow are evaluated. The criteria are based on the level of service (LOS) classification system. The LOS is a professional industry standard by which the operation conditions of a given roadway segment or intersection are measured. LOS A indicates free flow of traffic with minimal vehicle delays, whereas LOS F indicates extreme congestion with significant delays. Refer to Table 4-I – Roadway Performance Standard. Table 4-I Level of Service Roadway Performance Standard Represents free flow. Individual drivers have a high degree of LOS “A” freedom to select their travel speeds and are unaffected by other vehicles. Represents stable flow, but individual drivers are somewhat LOS “B” affected by other vehicles in determining travel speeds. Represents stable flow, but the selection of the speeds of LOS “C” individual drivers is significantly affected by other drivers. Represents a condition of high density, stable traffic flow in LOS “D” which speed and freedom of movement are severely restricted by the presence of other vehicles. Represents operating conditions at or near capacity. Individual vehicles have little free to maneuver within the traffic stream and LOS “E” any minor disruptions can cause a breakdown in the flow of traffic. Represents breakdown conditions. At this level of service, LOS “F” speeds are low, delay is high, and there are more vehicles entering the roadway than can be accommodated. Page | 84 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 It is the intent of the Imperial County that all roadways within unincorporated areas, including the Heber Public Utility District service area operate at a LOS “C” level or better. The criteria range is adjusted for the different street classifications depending on the street designation and thus designed capacity. Table 4-J describes the average vehicle trips that can be supported by the respective street classification in order to operate at LOS-C or better. Table 4-J Imperial County Standards Per Street Classification Average Daily Trips for Level of Service Street Classification A B C D E Highway/Expressway 30,000 42,000 60,000 70,000 80,000 Prime Arterial 22,200 37,000 44,600 60,000 57,000 Minor Arterial 14,800 24,700 29,600 33,400 37,000 Major Collector 13,700 22,800 27,400 30,800 34,200 Minor Collector 1,900 4,100 7,100 10,900 16,200 Local County * * <1,500 * * Levels of service are not applied to residential streets since their primary purpose is to serve abutting lots, not carry through traffic. Levels of service normally apply to roads carrying through traffic between major trip generators and attractors. Inventory of Existing Transportation Facilities The circulation system within the Heber Public Utility District is comprised of numerous grid style roadways of different classifications that are designed to accommodate varying traffic flows. Most local streets are oriented in a north/south and east/west grid style system. The following is the identification of the different roadway classification and the applicable roadways within the Heber Sphere of Influence that meet that respective classification: State Highway/Expressway – the main function of this classification is to provide regional and intra-county travel services. Features include high design standards with six travel lanes; wide, landscaped medians; highly restricted access; provisions for public transit lanes, including but not limited to, bus lanes, train lanes, or other mass transit type means; and no parking. Both Highway 86 and 111 are major State Highways located within the exiting Public Utility Area but are managed by the State Department of Transportation. The following is a list of highways located within HPUD: Page | 85 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 • Highway 111 begins at the International Border between Mexico and the United States traveling north beyond Imperial County. The portion within the vicinity of Heber contains two travel lanes in each direction with traffic volume ranging from 33,500 to 37,000 average daily trips (ADT’s) as of 2006. This flow classifies this segment as a Level of Service (LOS) between A and B. The segments of Highway 111 within the HPUD Sphere of Influence are: Jasper Road to SR-86 (Heber Road) and SR- 86 (Heber Road) to McCabe Road. • Highway 86 is generally a north-south route that begins near the Townsite of Heber as a two lane conventional highway, and ends at the Riverside County line as a four-lane expressway. The segment within the Heber Sphere of Influence has a traffic volume ranging from 14,700 to 36,000 ADT’s which is between LOS A and B. The applicable Highway 86 roadway segment within the HPUD Sphere of Influence is from Highway 111 to Corfman Road (east/west) and from Heber Road to McCabe Road (north/south). Prime Arterial – The main function of this classification is to provide regional, sub-regional, and intra-county travel services. Features include high design standards with four to six travel lanes, raised and landscaped medians, highly restricted access, which in most cases will be a one mile (1 mile) minimum, provisions for public transit lanes, including but not limited to bus lanes, train lanes, or other mass transit type means and no parking. The following is the prime arterial located within Heber PUD: • Dogwood Road - A north-south two-lane undivided from Malan Road at the southern limit of Brawley to Highway 98 outside of Calexico. The applicable Dogwood roadway segment within the Heber Sphere of influence is from McCabe Road to Willoughby Road/Jasper Road. Dogwood Road widens to accommodate two southbound lanes, a center left-turn lane, and one northbound lane from Black Hills Road to approximately 900’ south of Hawk Street in Heber. The segment within Heber’s sphere of influence has an ADT range of 8,690 and is classified as a Level of Service A. Minor Arterial – These roadways provide intra-county and sub regional service. Access and parking may be allowed, but closely restricted in such a manner as to ensure proper function of this roadway. The following is a list of minor arterials within Heber Public Utility District. • Correll Road – A two-lane east-west roadway which connects SR 111 and Dogwood Road along the north side of Heber. A significant increase in traffic is expected due to proposed developments in the area. The Page | 86 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 County’s General Plan Circulation and Scenic Highway Element does not include ADT for this roadway. • Fawcett Road – A two-lane east west roadway that traverses Heber sphere of influence from its western boundary to Highway 111. The County’s General Plan Circulation and Scenic Highway Element did not provide the ADT for this roadway. • Heber Road – An east-west two-lane undivided roadway with a 24-foot paved width from SR 111 to Bowker Road. This roadway has the same service footprint as the segment for Highway 86 that traverses the Heber sphere of influence. The segment is strictly bounded by the western sphere of influence limit to Highway 111 and an ADT range between 14,700 to 36,000. This flow classifies this segment as a level of service between A-B. • McCabe Road – An east-west two-lane undivided roadway with a 24- foot paved width. This roadway is located along the northern boundary of the Heber sphere of influence from Farnsworth Lane to Highway 111. The County’s General Plan Circulation and Scenic Highway Element did not provide the ADT for this roadway. Major Collector (Collector) – These roadways are designed for intra-county travel as a link between the long haul facilities and the collector/local facilities. The following is a list of the major collectors located within Heber PUD: • Rockwood Road – Although not included the County’s Circulation Element, Rockwood Road acts as a major north-south collector in Heber connecting Correll Road with Highway 86/Main Street. Those travelling to and from the newly constructed Dogwood Elementary School use Rockwood Road. • Pitzer Road – A two-lane north-south roadway which connects Danenberg Road in El Centro to Jasper Road. The ADT of 1,500 classifies this segment as a Level of Service A. Pitzer Road is a principal route for traffic oriented to/from the Imperial Valley Mall. Local Collector – There are numerous local collectors within the Heber community and Sphere of Influence. The Street Classification Map incorporated as Exhibit 4-J provides a visual display of the roadway system serving the Heber community. Page | 87 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 Page | 88 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 Pedestrian/Transit Facilities - Pedestrian facilities such as sidewalks or transit facilities are also considered transportation facilities. Approximately 60% of Heber is served by a sidewalk on one side of the street or the other or both. Newer residential subdivisions in particular have sidewalks but there is a lack of sidewalks in the more established Townsite of Heber. Please refer to Exhibit 4-K for a general inventory of sidewalk location. There is no sidewalk connectivity along the major thoroughfares. For instance, 600-700’ sections of Dogwood Road (a Prime Arterial) are missing sidewalks; and except for the northern portion of Heber Road between Dogwood Road and Heber Avenue, there are no sidewalks on Heber Road. Additional transportation options for residents and visitors of Heber include Imperial Valley Transit (IVT) services, which is an inter-city fixed route bus system subsidized by the Imperial County Transportation Commission. Existing ridership averages approximately 70,000 passengers a month (Source: ICTC, 2016). IVT Line 1 connects Calexico with El Centro and vice versa. There are three stops in Heber: at the intersection of Heber Road & Nina Road, Heber Road & Parkyns Avenue and Dogwood Road & Correll Road. From Line 1, transfers can be made in El Centro to other bus routes, connecting other points in the county, including Imperial Valley College and other communities like Brawley and Calipatria. Bus shelters are available for the southbound route at Parkyns and Nina and the northbound route at Dogwood and Correll. Adequacy of Existing Transportation Facilities Roadway Conditions- Per the Imperial County Circulation Element, updated in 2008, all roadways within the Heber Sphere of Influence are operating at a Level of Service C or better, with the exception of Dogwood Road between Heber Road to Jasper Road which had a Level of Service D. As areas within the District and Sphere of Influence continue to develop road improvements to accommodate the existing and projected demand will be necessary. Future improvements will be required to be constructed to full improvements in accordance with the design standards set forth by the County of Imperial. Roadway conditions are evaluated by the County of Imperial. Imperial County prepared a Pavement Management Report in February of 2012. Under the report, roadway improvement projects were identified based on condition. There are three steps to the pavement management process; 1) system configuration, 2) field surveys, and 3) analysis and reporting. System configuration involves identifying Page | 89 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 Page | 90 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 all roadways in the County’s network where they are given an identification number, noting their physical characteristics such as length and width, pavement type, traffic, and functional classification. The second step of the pavement management process is field surveys. Pavement Management Software uses a Laser Road Surface Tester (Laser RST) which observes the condition of the pavement surface, collects digital imagery, and spatial coordinate information. Data collected by the Laser includes rutting, roughness index which measures bumps per mile, and surface distress index which observes the extent and severity of the distress on pavement. The final step is Analysis and reporting which creates a single score that represents the overall condition of the pavement known as the Pavement Condition Index (PCI). The PCI adds thirty-three percent (33%) of the roughness index and sixty-seven percent (67%) of the surface distress index to provide a range. PCI ranges are divided into the following six descriptions: 100-85 are described as excellent, 70-85 are described as very good, 60-70 are described as good, 40-60 are described as fair to marginal, 25-40 are described as poor, and 0-25 are described as very poor. The PCI is used along with the priority weighting factor (PWF) to determine the priority ranking if each road way as shown in the following formula: Priority=(100 –PCI) X PWF. The priority weighting factor (PWF) are predetermined numbers used by the County which gives emphasis to arterial roadways, and is followed by residential road ways, and leaves collector roadways with the lowest priority weighting factors. The Pavement Management Analysis determined that certain roadways within the Heber community necessitated improvement (See Appendix A). Roadways assessed within the Heber community included, but were not limited to the following: Correll Road PCI = 82 Dogwood Road PCI = 36,37,49 Fawcett Road PCI = 41 Hawk Avenue PCI = 25,33,88 Heber Road PCI = 20,26,28,69 Pitzer Road PCI = 39,85 Rockwood Avenue PCI = 23 The County of Imperial has earmarked the following street segments for improvement to be completely improved before the end of the FY 18/19. • Hawk Avenue-Heber to Dogwood • Heber Avenue- Correll to Highway 86 • Rockwood Avenue- Correll to Highway 86 Page | 91 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 Sidewalk Conditions- As previously noted, sidewalk segments are lacking throughout the original Heber Townsite. The sidewalks within newly developed residential subdivisions were constructed recently and generally in good repair. Those within the mature Townsite of Heber are generally in acceptable condition but there is minor to substantial cracking in various location and severe vertical displacement (greater than ½”). Most sidewalks in the Townsite terminate at intersections with no curb ramps. Furthermore, the sidewalks do not meet the current minimum standard with required under the Americans with Disabilities Act (ADA). Sidewalks should be constructed consistent with the County of Imperial Development Standards and/or the California Department of Transportation, depending on right-of-way ownership and concurrent with curb and gutter along paved streets. The community however is also lacking curb and gutter as discussed in the Stormwater & Drainage Section. The Imperial County Transportation Commission (ICTC) commissioned a County- wide Safe Routes to School Plan to identify issues related to deficiencies in bicycle and pedestrian facilities that school aged children routinely travel to and from schools. Each school site, including those in Heber, was analyzed and recommendations were developed. Lack of sidewalks (mud/dirt paths) was identified as a general safety concern by parents, students, school faculty, an other stakeholders. Specific locations identified in the Safe Routes to School Plan include the lack of sidewalks and need for new construction as follows: • on a 100’ section of Dogwood Road between Correll and Hawk Road • the south side of 14th Street from Heber Avenue to Heffernan Road • Fawcett Road between Heber Avenue and Heffernan Road. • The stakeholders also identified the lack of sidewalks connecting residential neighborhoods east of the railroad tracks to both Dogwood Elementary and Heber Elementary Schools. Freight Facilities-Heber is traversed by a non-passenger, freight only rail system. Union Pacific Railroad (UPRR) owns the rail lines through Heber connecting freight from Mexico to the south at Calexico north to Niland where it branches east and west to connect to all points throughout the US. Buildout Demand for Transportation Facilities Heber is expected to grow to 7,467 equivalent dwelling units (EDU’s) by 2040 if all approved, planned, and infill development projects are built out. This would result in an estimated 74,670 average daily trips (ADT’s) based on an average 10 ADT per EDU. New internal roadways will be built to service the immediate needs of the development projects but those same projects are required to pay impact fees to offset the cost of improving system-wide roadways. Page | 92 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 Travel to and from the development projects will largely be supported by the backbone roadways shown on Exhibit 4-J. Highway capacities are generally estimated to be 16,000 vehicles per lane of travel but traffic becomes a major issue when volume-to-capacity (v:c) ratios of 0.7 or greater are experienced. For instance, the Imperial County General Plan Circulation Element estimates that Highway 86 from Heber Road to Dogwood Road will carry 26,100 ADT’s in 2025. This would put this section of Highway 86 at 0.82 v:c ratio and a Level of Service D. Upgrading Highway 86 to a 6-lane divided arterial as called out in the County Circulation Element, the County estimates the 2050 traffic to be at 33,500 ADT’s and operating at LOS B. The roadways shown in Exhibit 4-J carry inter- and intra-municipal traffic, and so, regional traffic would also have to be taken into consideration. Table 4-K summarizes the buildout demand. Table 4-K Future Roadway Classifications and Projected Traffic Volumes Year 2025 Year 2050 Year 2050 Volume Volume Roadway Upgrade (ADT) (ADT) Correll Road Minor Arterial NA NA Dogwood to HWY 111 (4-lane) Fawcett Major Collector NA NA Dogwood to Meadows (4-lane) Jasper Expressway NA NA (6-lane) McCabe Prime Arterial 17,120 28,500 La Brucherie to HWY 111 (6-lane divided) Pfitzer Major Collector NA NA Chick to Jasper (4-lane) Ware Major Collector NA NA (4-lane) Highway 86 Prime Arterial 26,100 33,500 (6-lane divided) HWY 11 Freeway 98,650 112,000 Heber to McCabe (8-lane) Source: Imperial County Circulation Element 2008 Page | 93 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 Opportunity for Shared Transportation Facilities The Heber community uses both County and State roadways. Cooperative efforts between the County of Imperial and Caltrans will ensure that shared facilities are adequately maintained and upgraded to prevent service deterioration. Phasing of Transportation Facilities It is procedural that new improvements to transportation facilities be provided during the development process. Imperial County is responsible for ensuring that developers construct required street improvements associated with each project and/or impacted by each proposed development. Caltrans involvement is also critical during the planning stages and environmental review process of all new development. Major roadway improvements planned under the approved SPA’s in the HPUD service area include the following: McCabe Ranch II • SR-86: McCabe Road to Heber Road- Contribute a fair share toward the widening of SR-86 between McCabe Road and Heber Road to a 6- lane prime arterial. For all portions abutting the project site, the Developer or subsequent builders shall provide for the widening of SR- 86. • SR-86: Corfman Road to Dogwood Road- Contribute a fair share toward the future widening of SR-86 between Corfman Road and Dogwood Avenue to a 6-lane prime arterial for all portions not abutting the project site. For all portions abutting the project site, the Developer or subsequent builder shall provide for the widening of SR-86. • Dogwood Road: McCabe Road to SR-86- Contribute a fair share toward the future widening of Dogwood Avenue between McCabe Road and SR-86 to a 6-lane prime arterial. • McCabe Road: SR-86 to Dogwood Avenue- Contribute a fair share toward the future widening of McCabe Road between SR-86 and Dogwood Avenue to a 6-lane prime arterial. McCabe Ranch II is comprised of four related but independent components to be developed in various phases. The first phase will be developed north of McCabe Ranch I, then continuing north, west and south. Internal roadways connecting to regional roadways will be developed in accordance with the Phasing Plan outlined in the Specific plan. The development timing of each component will be determined by market conditions and is somewhat Page | 94 Heber Public Utility District Service Area Plan Transportation Facilities January 2018 independent of the other components. The Specific Plan and Tentative Map were approved in 2010 and no construction activity has taken place since then. Imperial Center Portions of Phase A and Phase B of the Imperial Center have been completed. Yourman Road was relocated prior to the opening of the first development project. The following additional improvements will occur as other components of the project move forward: • Heber Road- Heber Road shall be widened to five lanes prior to Phase D from Scaroni Road on the west to the east of the edge of the project. • Yourman Road and Heber Road- A traffic signal shall be installed prior to the addition of Phase D. • Heber Road and SR-111 Intersection- The intersection shall be widened and improved. • SR-111- The developer shall contribute a fair share towards the planned widening of SR-111. • Heber Road and Yourman Road- The Heber Road and Yourman Road (east) realigned intersection shall be signalized and widened. Market forces have delayed some of the improvements. For additional information regarding the transportation improvements planned under the Imperial Center project, refer to the Imperial Center Specific Plan Conditions, attached as Appendix B. Mitigation for Transportation Facilities No further mitigation, outside of the adopted procedures incorporated by Imperial County, are necessary. Most of the circulation improvements identified will be constructed by future developers as development occurs. T-1 HPUD should consider attending ICTC Meetings and engaging in funding opportunities. Page | 95 Heber Public Utility District Service Area Plan Drainage Facilities January 2018 4.2.5 DRAINAGE FACILITIES The primary purpose of maintaining, planning, designing and constructing drainage facilities is to control flooding. Drainage facilities in unincorporated communities and within public roadways are owned by Imperial County, while the broader drainage system in the entire Imperial Valley are within the jurisdiction of the Imperial Irrigation District (IID). In conjunction with an irrigation network that includes more than 1,600 miles of canals, IID operates and maintains an agricultural drainage system consisting of more than 1,400 miles of surface drains. The Heber Public Utility District discharges into the Central Drain (owned by IID) which ultimately drains into the Alamo River, a tributary to the Salton Sea. It should be noted, however, that the primary drainage system managed by IID is not designed to convey all stormwater runoff from urbanized areas. Therefore, new development must provide for on-site retention of stormwater to mitigate against stormwater impacts which are managed by the Imperial County unless a project specific agreement has been entered with the HPUD for operation and maintenance. Performance Standard for Drainage Facilities Imperial County does not have an official flood control agency. Drainage standards for the HPUD service area are established and regulated by Imperial County during the review of any development projects. The county follows regulations established by the Colorado River Basin Water Quality Control Plan, National Pollution Discharge Elimination System requirements, the requirements of the Federal Emergency Management Agency, and the requirements established by the Imperial Irrigation District. Releasing runoff is done in accordance with IID standards in order to provide storm runoff protection for downstream properties. The County of Imperial typically assesses drainage conditions of a project site and requires the construction of any necessary drainage infrastructure. The County requires developers to construct all drainage facilities within each project as a condition of approval. Additionally, prior to approval of a final subdivision map, a grading plan or implementing permit, it is required that a drainage study be conducted by a registered civil engineer and submitted for review and approval by Imperial County and the IID. It is customary for new development to be required to construct detention basins which retain on-site-run-off storm water so it can be released to IID facilities at a controlled rate. The improved drainage facilities within the Heber Public Utility District are maintained by the applicable property owner and ultimately governed Page | 96 Heber Public Utility District Service Area Plan Drainage Facilities January 2018 by Imperial County standards and IID discharge permits, as applicable. Long term operation and management would be borne to the County of Imperial or to any concurrently designated special Maintenance District. Inventory of Existing Drainage Facilities The IID maintains an extensive gravity flow drainage system that serves the entire Imperial Valley. The native material and concrete lined lateral drain system was designed to provide a drainage outlet for each governmental subdivision of approximately 160 acres. The IID allows a single 12 inch diameter pipe for every 160 acres. The IID is obligated to provide its drains at sufficient depth, generally 6-10 feet deep in order to be able to accept tile drain discharge. Where the drain cannot be maintained at sufficient depth, a sump and pump are provided and maintained by the IID. Development within the Heber Public Utility District ultimately discharges into the Central Drain, which is located to the north or the Date Drain located to the West of the Heber community. Before stormwater is received by IID facilities, it channels through a drainage system which includes various retention basins throughout the District. Not all retention basins within the Sphere of Influence and official District boundary are owned by Heber Public Utility District. Some of the retention basins identified within the HPUD boundary are listed in Table 4-L and depicted in Exhibit 4-L. Table 4-L Stormwater Retention Basins Within HPUD Size APN Location Owner Southwest Corner of Black Hills Road 5.37 AC 054-621-001 and Cherry Avenue (Estancia) Heber Public Utility District Southwest Corner of Black Hills Road 1.65 AC 054-621-002 and Cherry Avenue (Estancia) Heber Public Utility District Southeast Corner of Cherry St. and 2nd 4.35 AC 054-634-001 Street (Tito Park Area) Heber Public Utility District Northwest Corner of Hawk Street and 6.03 AC 054-634-002 Palm Avenue (Tito Park Area) Heber Public Utility District Southeast Section of Heber Avenue 3.59 AC 054-493-001 Heber Public Utility District and Correll Road (off of Heber Avenue) Southwest Corner of Correll Rd. and Heber Meadows I LLC & 6.22 AC 054-605-009 Bloomfield St. Meadows LLC Page | 97 Heber Public Utility District Service Area Plan Drainage Facilities January 2018 Page | 98 Heber Public Utility District Service Area Plan Drainage Facilities January 2018 Adequacy of Existing Drainage Facilities The Correll Road basin (APN 054-605-009) was not satisfactorily improved by the Developer and the HPUD has been working with Imperial County on acceptable solutions including dual use. As of the date of this Service Area Plan it had been determined that HPUD would place submersible pumps into the Correll basin to drain any standing stormwater and ensure proper drainage within 72 hours of any storm events. Additionally, there are several areas within the Heber Townsite, along the public roadways and right-of-way, that hold stagnant water during and after storm events. Deficiencies are primarily due to lack of curb, gutter and a regional storm water collection service. Stormwater flow conditions in the Heber Townsite are the responsibility of the County of Imperial, Public Works Department. HPUD should make a concerted effort to work with Imperial County Public works to resolve these deficiencies and to prevent future storm water issues. Inventory of Approved Drainage Facilities Other drainage facilities planned for under Specific Plans approved by Imperial County include drainage facilities provided by McCabe Ranch II and the Imperial Center. McCabe Ranch II proposes a number of retention basins, consisting of two (2) retention basin with a total combined size of approximately 10.8 acres. The Imperial Center Development, which is to be serviced by the Heber Public Utility District, proposes to include a retention basin with an approximate size of 5.2 acres. As of September 2017, no transfer of ownership of the planned retention basins has occurred. The County of Imperial initiated the formation of Lighting Landscape Maintenance District for the ongoing operation and maintenance of the Imperial Center Retention Basin under which HPUD is not a partner and thus not liable for the operation and maintenance of said facility. Table 4-M Proposed Stormwater Retention Basins within the HPUD Size APN Location Owner Southwest corner of a Farnsworth Road 5.0 AC 045-130-077 extension and an unnamed east/west Cathay Bank roadway Southwest corner of Dogwood Road and 5.8 AC 054-130-078 Cathay Bank McCabe Road Intersection Near the Southeast corner of Highway Pacificland and International 5.2 AC 054-080-001 111 and Abatti Road Development Inc. Southwest Corner of Correll Road and .53 AC 054-601-016 Heber 20, LLC Pitzer Road Page | 99 Heber Public Utility District Service Area Plan Drainage Facilities January 2018 Buildout Demand for Drainage Facilities As development occurs, stormwater drainage systems must be installed to ensure adequate removal of runoff. Developments will be required to construct grass lined detention basins to retain stormwater that may be generated by a 100-year, 24- hour storm. Stormwater will be discharged into existing drains upon the IID’s approval. Some development projects will also be required to relocate and underground the existing canals and drains within their project areas to satisfy Imperial Irrigation District requirements. All of these improvements are developer driven. Opportunity for Shared Drainage Facilities The primary drainage system is managed by IID and is not intended to convey stormwater generated by urban runoff, although some storm water does flow into the IID drainage system, as previously noted. The County of Imperial, Imperial Irrigation District, and Heber Public Utility District maintain different aspects of the total drainage system management. Some of the existing and planned detention basins are intended for joint use as parks. In order to be considered as a joint use, the retention basin must be landscaped and meet some minimum standards. Of the five (5) retention basins located within HPUD, two (2) of the retention basins are utilized as parks. The multi-use basins are Estancia Park and Margarito “Tito” Huerta Jr. Park. The shared acreage for park use is approximately, 17.4 acres. Table 4-N Shared Retention Basin/Park Space Park Name Owner Location Size Continental Northwest Corner of Correll Rd. Estancia Park 7.02 AC Residential and Cherry St. Margarito “Tito” Huerta Jr. Park Northwest Corner of Palm Ave. (Encompasses two (2) retention HPUD 10.38 AC and Hawk St. basins Total Acres of Parkland 17.4 AC Phasing of Drainage Facilities The construction of future storm water drainage facilities is based on the pace of new development. Additional storm water drainage facilities will be needed in the Page | 100 Heber Public Utility District Service Area Plan Drainage Facilities January 2018 proposed Specific Plan Areas in order to properly convey storm water into the IID drainage system. The storm water management systems will be designed during the Tentative Map and Final Map stage of development and approved by the County of Imperial. Mitigation for Drainage Facilities Although the Heber Public Utility District is not primarily responsible for storm- water facilities, the District has, in the past, assumed operation and maintenance responsibilities of retention basins. The stormwater flow conditions may further impact many of the HPUD’s other community facilities including parks. It is for these reasons that the following mitigation measures are recommended: D-1 The Heber Public Utility District shall continue to review all development proposed, prior to service commitment and annexation, and shall ensure design standards of stormwater facilities are per Best Management Practices prior to accepting the granting of improved retention basin and stormwater infrastructure when accompanied by an operation and maintenance funding mechanism. D-2 The HPUD should continually monitor the existing storm drain facilities owned by the IID, Special Districts and/or Imperial County to ensure that the facilities are operating at an adequate level. Any incidents of violations from stormwater facilities not owned or managed by the HPUD should be reported immediately to Imperial County for enforcement. D-3 The HPUD should petition the Imperial County Board of Supervisors for the preparation of a Heber Community Drainage System Study and Master Plan similar to those completed by Imperial County for other unincorporated areas of Imperial County. Page | 101 Heber Public Utility District Service Area Plan Services Provided by Others January 2018 4.3 SERVICES PROVIDED BY OTHERS There are additional services provided within the Heber Service Area by agencies other than Heber Public Utility District or Imperial County. These special services include lighting and landscaping facilities and educational facilities. The sections that follow will discuss these services that are provided by other special districts in the following context: • Lighting & Landscaping Facilities- Lighting facilities refer to the existing street lighting system within the Heber Public Utility District service area. The street lighting system consists of the street lights and supporting facilities such as poles and wires. Landscaping Facilities refer to those landscaped areas within public right-of-way. • School Facilities- School facilities consist of improvements necessary to provide educational services including classrooms, libraries, cafeterias, etc. School facilities may further incorporate support services such as school buses, gym or lab equipment and recreational facilities. Page | 102 Heber Public Utility District Service Area Plan Lighting Facilities January 2018 4.3.1 LIGHTING FACILITIES (Owned by Others) Public lighting facilities are typically owned by the jurisdiction owning the right-of way under which they are found. If Imperial County has street right-of-way then lighting located upon that right-of-way will likely be owned by Imperial County. Within other HPUD areas, Imperial Irrigation District continues to own some of the lighting facilities. However, under the HPUD and Imperial County Settlement Agreement of 2012, the operation and maintenance of the street lighting system in Tax Rate Areas: TRA 066-001, TRA 066-002, TRA 066-003, and TRA 066-004, (which covers the entire service area) have been agreed to be provided by the HPUD to be paid from ad valorem tax allocation unless additional funding is allocated through a Community Facility District or newly established Lighting and Maintenance District. The Imperial Irrigation District owns the lighting facilities within the older Heber Public Utility District urban areas (Refer to Exhibit 4-M – Street Lighting System in Heber). Heber Public Utility District owns the public lighting within parks and retention basins owned by the District. Operation costs for electrical services are typically borne by the jurisdiction owning the right-of-way unless a contract for service exists with private owners or another entity. Performance Standard for Lighting Facilities There are no adopted performance standards by Imperial County or Imperial Irrigation District for lighting facilities. Street lights within the Heber Public Utility District Area vary from 70 Watts to 250 Watts. Typical street lights with 150-watt bulbs provide a coverage of approximately 150’ diameter, and as such, street lights should be located every 300’ to provide full coverage along sidewalks. Street lights should also be installed at intersections to ensure night-time visibility for vehicular traffic. Lighting provides safety and security but fixtures should be shielded to minimize light spill on to homes and to minimize light pollution to maintain a dark, night sky. Generally, if lights are not functioning, the HPUD will need to expose the issue and IID makes the repair to the light and the cost is borne by the HPUD unless there is a designated private owner or corresponding assessment district. Older street lights generally have wooden poles and are owned by the Imperial Irrigation District while the newer lights within more recent developments consist of metal poles. It is important to note that IID incorporates energy efficiency components throughout its lighting facilities. Page | 103 Heber Public Utility District Service Area Plan Lighting Facilities January 2018 Page | 104 Heber Public Utility District Service Area Plan Lighting Facilities January 2018 Inventory of Existing Lighting Facilities There are approximately 219 street lights within the Heber Public Utility District’s main core (Refer to Exhibit 4-M – Street Lighting System in Heber). The existing placement of street lighting is adequate for the existing HPUD neighborhoods. Based on the available Lighting System in Heber Exhibit, there is an average of one light pole every 243 lineal feet. There is currently one substation within Heber’s urbanized area. This substation was upgraded approximately 10 years ago to serve the residential developments in Heber constructed during the first decade of the 21st century (2000-2010). Adequacy of Existing Lighting Facilities The Street Lighting System in Heber is adequate in size and capacity to serve existing development as no areas of deficiency were noted while lights are in service. The existing substation would further be able to serve two new residential developments of similar sizes to those developed within the time frame of 2000- 2010 (Source: IID Energy Records Unit). If the developments were unusually large, the substation would be required to be upgraded to accommodate them. Buildout Demand for Lighting Facilities As residential and commercial development occurs, developers work with the Imperial Irrigation District to install lighting facilities. Developers are required to submit various applications to the Imperial Irrigation District and pay applicable fees. The Developer is responsible for providing all project related documentation, inclusive of an approved Street Lighting Plan. After fees are paid, the Imperial Irrigation District’s Distribution Engineering Section prepares a job package for construction. Imperial County approves the both the Street Lighting Plan and building permit as the District does not have land use authority. Should a development demand services beyond what can be supported by the existing substation, the costs of providing another substation are borne by the developer. Opportunity for Shared Lighting Facilities HPUD is within close proximity to the El Centro Sphere of Influence and there may be opportunities in the future for shared substations. There might also be opportunities for street lights to be double with community park lighting. Page | 105 Heber Public Utility District Service Area Plan Lighting Facilities January 2018 Phasing of Lighting Facilities Lighting facilities are constructed on an as-needed basis for all new development. Phasing of lighting facilities is typically consistent with the phasing of residential or commercial development. As development occurs, street lights are incorporated to ensure safety. Mitigation for Lighting Facilities Public lighting is typically paid through the collection of property tax by the jurisdiction owning the subject right-of-way. Although the Heber Public Utility District is not primarily responsible for lighting facilities, the District has, in the past, assumed operation and maintenance responsibilities of a number of street lights throughout the established community. For these reasons, the following mitigation measures are recommended: OF-1 The HPUD shall ensure that prior to assuming any additional lighting service responsibilities that accompanying revenues be agreed to whether it be via tax share agreements or specific community facility districts service agreements. Page | 106 Heber Public Utility District Service Area Plan School Facilities January 2018 4.3.2 SCHOOL FACILITIES Performance Standard for School Facilities The schools’ capacity is determined according to the methodology specified by Education Code Section 41376 and 41378. These calculations determine that kindergarten shall be at a maximum of 33 students per classroom, first through third grade classrooms at 32 students per classroom and fourth through eighth grade classrooms at 29 students per classroom. School Facilities Owned by Heber Unified School District Educational facilities and services are provided within the Heber Public Utility District by the Heber Unified School District which covers an area of approximately, 10.59 square miles. The school district provides educational services to the Heber community for grades kindergarten through eighth and does not provide high- school education. Information contained in this section was derived from the School Facilities Needs Analysis prepared for the Heber Elementary School District by J. Robinson’s School Facilities Planning dated August 4, 2009 and further verification with the Heber Unified School District’s Superintendent in October 2017. It is important to note that as Heber Public Utility District annexes new areas, the new territory may be within the boundary of other school districts including the McCabe School District and El Centro Elementary School District. At the current time, the Heber Unified School District is the only District with territory within the Heber Public Utility District Footprint (Please refer to Exhibit 4-N – Heber Public Utility District School Facilities Map). Inventory of Existing School Facilities The Heber Unified School District operates two elementary schools and the District office. The two elementary schools are Dogwood Elementary located at 44 East Correll Road in Heber and Heber Elementary located at 1052 Heber Avenue. The School District operates from one building that is located on the Heber Elementary School campus. Dogwood Elementary School has 28 classroom with a maximum capacity of 924 (Flores, 2011) and Heber Elementary School has a capacity of 732 students for a district-wide capacity of 1,656 kindergarten through eighth grade students. The corresponding High School District is the Central Union High School District, which encompasses an area of 145.8 square miles. All students graduating from 8th grade within the Heber Public Utility District will attend Southwest High School. Page | 107 Heber Public Utility District Service Area Plan School Facilities January 2018 Page | 108 Heber Public Utility District Service Area Plan School Facilities January 2018 Heber Elementary School was established in 1901 and has 57 classrooms for fourth through eighth grade students with a student capacity of 732. There are currently 660 students enrolled at the school (Heber Elementary School Report, 2017) and there is capacity for an additional 72 fourth through eighth grade students. The Heber Elementary School campus is comprised of three different sections of buildings: Section One built in 1974 and currently unoccupied; Section Two was built in 1952 and is occupied by the middle grades; and Section Three which was built in 1974 and is occupied by the junior high grades. In the summer of 2008, the junior high school multi-purpose room, classrooms and some offices were remodeled. Also during the summer of 2009, portables were added in the primary and middle grades and none have been constructed since then through 2017. Dogwood Elementary School was established in January 2011 and provides educational services for kindergarten through third grade students out of 28 classrooms. The current enrollment at Dogwood Elementary is 585 students (Heber Elementary School Report, 2017) while the student capacity is 924. The school has sufficient classroom capacity for 339 additional kindergarten through third grade students. The facilities are fairly new and are not in need of rehabilitation. School Facilities Owned by Other School Districts McCabe Union Elementary School District- A portion of Heber’s Sphere of Influence is located within the McCabe Union Elementary School District which encompasses a total area of 109 square miles. As of the date of this Service Area Plan, only one development project (McCabe Ranch II Specific Plan) would be located in the McCabe School District. Central Union High School District- Neither Heber Unified School District or McCabe Union School District have a high school. All students graduating from 8th grade within the Heber Public Utility District will attend Southwest High School. Page | 109 Heber Public Utility District Service Area Plan School Facilities January 2018 Inventory of Approved School Facilities The Heber Unified School District does not have any approved plans for the construction of new classroom facilities as it was operating below capacity as of the date of this SAP. There are approved plans, however, to construct a new gymnasium at Heber School during the 18/19 fiscal year. Additonally, the Heber Unified School District might consider constructing new classrooms to accommodate any changes in increased demand for services to accommodate new development and population growth. As new development is planned outside of the current Heber Unified School District boundary, applicable school districts will need to fulfill the demand for new school facilities. The planned and approved McCabe Ranch II development incorporates school facilities within its approved development. McCabe Ranch allocates 13.3 acres for the McCabe School District and 15.2 acres for the Heber Unified School District. Adequacy of Existing School Facilities The existing Heber Unified School District facilities are adequate to meet the educational needs of the current population. The Heber Unified School District, however, will not be able to meet the expected demand from the projected population growth without additional facilities. As new development is proposed, close coordination with the applicable school districts is required to ensure proper development impact fees are assessed and that necessary facilities are constructed to accommodate the new development. Buildout Demand for School Facilities The most current data available for estimate the future demand on the school system is the Heber School Facilities Needs Analysis (SFNA) prepared in August 2009. The analysis shows that the student generation rate for Heber and the surrounding areas is 0.62 students for every new housing unit and that there would be 1,275 new housing units built by 2015. However, there were only 285 new housing units built in the last seven years (based on the number of new residential water connections). In 2009, there were 1,049 students enrolled from kindergarten to the 8th grade, and according to Ed-Data.org, whose information is sourced from the California Department of Education, the current enrollment for the 2016-2017 school year is 1,245 students in the Heber Elementary School District (HESD). This represents an increase of only 196 students and an approximate student generation rate of 0.69 students for every new housing unit. Utilizing the historic population growth rate of 2.71%, it is estimated that there would be 1,520 new housing units built by 2040. This would result in an additional Page | 110 Heber Public Utility District Service Area Plan School Facilities January 2018 1,049 new students (1,520 new housing units x 0.69 student generation rate = 1,049 students). The current capacity of Heber Elementary School is 732 students and Dogwood Elementary School is 924 students for a combined total of 1,656. Additional mobile classrooms can be added to each school as an interim measure but new campuses will have to be built prior to the end of the planning period. A typical elementary school generally has a capacity of 600 students and a middle school has a capacity of 950 students. Table 4-O shows the incremental increase in student population to the year 2040. Table 4-O Total Projected Student Population at Heber Elementary School District New Students Total Projected Student New Additional from New Population at HESD Year Housing Units Housing Units 2020 149 103 1,378 2025 277 191 1,569 2030 317 219 1,788 2035 362 250 2,038 2040 414 286 2,324 Detailed projections for ultimate buildout of all residential projects were not calculated, but all planned, approved, and infill development could result in 5,088 new residential units and up to 3,510 new students. Full buildout will generate a demand of four (4) to five (5) new elementary schools with a capacity of approximately 600 students per school and a new middle school with a capacity of 950 students. It should be noted that approximately 920 new residential units within the McCabe Ranch II Specific Plan Area will be constructed within the McCabe Union Elementary School District (MUESD). The 2012 School Facility Fee Justification Report notes the need to construct new elementary schools and a middle school to address impacts from all development within the MUESD boundaries. Like HESD, the student projections for MUESD were not realized during the last five (5) years. The McCabe Ranch II Specific Plan Conditions of Approval includes mitigation measures for payment of school fees to offset the impacts to all school districts. Page | 111 Heber Public Utility District Service Area Plan School Facilities January 2018 Phasing of School Facilities The existing 28 classrooms at Dogwood Elementary and 57 classrooms at Heber Elementary have capacity to accommodate a total of 1,656 kindergarten through eighth grade students. As previously noted, the 2016/2017 enrollment at both schools is 1,245 with an excess capacity of 411 students. There is sufficient capacity to house the projected student growth to the 2025. There are currently no plans to add any more class rooms. The McCabe Ranch II Specific Plan originally anticipated impacts to the McCabe Union Elementary School District between 2015 and 2020, but the slow-down in residential development has resulted in an unknown timeline for this project’s school impacts. New school facilities will be phased within the respective development schedule. McCabe Ranch II has dedicated land for the development of the school facilities anticipated to be needed to accommodate the new growth. Mitigation for School Facilities Dogwood Elementary School and Heber Elementary School are adequate in capacity to serve the current student population but will need to update their School Facilities Needs Analysis Plan to account for and plan for the projected growth within the service area. The Heber Public Utility District has no jurisdiction over schools and is only noting this service demand affecting its jurisdiction. Page | 112 Heber Public Utility District Service Area Plan Financing Plan January 2018 5.0 FINANCING PLAN 5.1 INTRODUCTION The Financing Plan section of the Service Area Plan lists and describes potential revenue sources and various financing mechanisms available to the Heber Public Utility District to meet the projected service and facility demands identified earlier in this document. It also describes how each existing facility and service is currently financed and how future financial demands for these facilities and services can be ensured. The HPUD’s audited Financial Statement shows that assets exceed liabilities by $27.8 million at the close of Fiscal Year ending June 30, 2016. The District’s unrestricted net position increased to $3.8 million compared to the prior year. The amount of net position in capital assets less related outstanding debt used to acquire those assets is $23.3 million. The latest Financial Statement shows that HPUD reported positive balances in net position. A copy of the June 30, 2016 Annual Financial Report is included as Appendix C. Finance plans and available financing options are also discussed in this section and are largely subject to the guidelines of Proposition 218 which was enacted in 1996. Proposition 218 clearly defines general taxes and special taxes and sets guidelines on the issuance, use, and implementation of taxes. Proposition 218 states that general taxes must be approved by a majority of voters before they can be imposed, extended or increased and special taxes require approval by a two- thirds vote. 5.2 EXISTING REVENUE SOURCES This section provides a summary of the revenue sources available to finance the necessary public facilities and services within the District Boundary or as areas within the Sphere of Influence are annexed. The following list presents sources of revenue that are currently utilized by the District in order to accumulate finances necessary to develop and operate the various facilities and services discussed within the SAP. Complete budgetary information for financing mechanisms currently utilized is available for viewing at the District Finance Department. Property Tax Property taxes generate revenue that can be used to support various improvements and services including general District expenses. Property taxes in California are governed by Proposition 13 which limits the property tax rate to 1%. Other voter approved bonds and assessment districts may also generate tax revenue. The County of Imperial, collects the property tax, and shares the tax Page | 113 Heber Public Utility District Service Area Plan Financing Plan January 2018 revenue collected from property owners within the District. Property taxes are distributed to various entities including, Imperial County, cities, and special districts according to formulas and procedures established by California law and consistent with the “Teeter Plan” for distribution of delinquent taxes owed. Each eligible tax jurisdiction receives a base amount of property tax that increases or decreases based on the growth of that district. According to Property Tax Information issued by the County Controller’s Office (2017), taxes are allocated as follows: schools receive 59%, Cities receive 22%, County receives 12%, Special Districts share 3%, Fire Protection receives 3%, and Libraries receive 1%. The District may, and has entered into specific tax sharing agreements for tax revenue over and above the aforementioned proportion. There is however, no official tax share agreement in place for all District areas. The District cannot rely on tax revenue beyond the stipulated by California Law until an official agreement is put in place and the County commits to consistent property tax revenue exchange. The District Finance Department estimates that approximately $500,000 in property tax revenue may be collected for the fiscal year 2017/18 and beyond. This tax, which may be collected annually, is utilized by the District to cover expenses for parks, lighting, drainage and water and sewer facilities. As infill development within the District is developed, the anticipated property tax revenue is also expected to increase. Expansion outside of the current District Boundary is not expected to automatically generate any new tax for the HPUD, unless a special assessment district is formed at the time. Development Impact Fees Development Impact Fees are charges to private developers to assure that the demand of physical and financial impacts to public services and facilities are adequately addressed. Development Impact Fees can be a significant funding source to finance large scale capital improvements to public facilities. Development impact fees are used exclusively to fund the capital costs of new and improved facilities specifically related to the category for which fees are charged. The HPUD has adopted water impact fees and sewer impact fees for all new development. The most recent adjustment to the impact fees was in 2010. The District adopted these impact fees in 2010 as capacity fees and collects the fees for both Water Treatment Facilities and Wastewater Treatment Facilities. The level of Development Impact Fees collected on any given year is driven by the level of new development demand. User Fees Certain public services and facilities operated by the District entail various user fees that are charged to patrons or other users on a fee-for-service basis. User Page | 114 Heber Public Utility District Service Area Plan Financing Plan January 2018 fees are typically applied to on a monthly service. Monthly fees may be charged for services such as water, sewer, and trash to residential uses, commercial uses, industrial uses, and/or public agencies. User fees are also charged for reconnections, penalties, and late fees. The fees are typically used as a revenue source to maintain the systems in proper operating condition and for the construction of facilities needed to meet demand. Developer/Builder Contribution Many of the sewer, water, drainage, and roadway improvements required as a result of new development can be directly funded and constructed by the developer/builder. These required improvements would be in addition to Developer Impact Fees and User Fees. Additionally, the District collects fees from developers/builders for administrative services such as planning reviews and/or plan checks. Community Facilities District A Community Facilities District (CFD), not to be confused with a Community Services District (CSD), falls under the 1982 Mello-Roos Community Facilities Act. This Act allows a CFD to be established by cities, counties, special districts and school districts to fund a variety of facilities and services. Note that the boundaries of a CFD are not required to be contiguous as they are for a CSD. In order for a CFD to be formed, a public hearing must occur, and an election held to authorize the specified tax levy to either provide direct funding or pay off bonds. Heber Public Utility District has one CFD within its District boundary, and more specifically for the McCabe Ranch I project area that has been fully developed. The McCabe Ranch I CFD was formed by the County of Imperial in order to fund park facilities and their ongoing maintenance. Other Local Revenue Sources The District currently generates revenues from other sources such as interest earned from bank accounts, royalties from a geothermal plant, and rent from Parcel 054-540-057 off of Rockwood Road (a District-owned property leased by Verizon. Although these miscellaneous revenues are useful, the estimated $35,000 in revenue accounts for less than 1 percent of the District’s total operational budget. 5.3 POTENTIAL REVENUE SOURCES Private Financial Institutions A financing opportunity may be via revenue bonds through private financial institutions as part of their Community Reinvestment Act (CRA) obligations. The Page | 115 Heber Public Utility District Service Area Plan Financing Plan January 2018 Community Reinvestment Act was enacted by the U.S. Congress in 1977 to encourage depository institutions to help meet the credit needs of the communities in which they operate, including low- and moderate-income neighborhoods, consistent with safe and sound banking operations. The Community Reinvestment Act requires federal financial supervisory agencies to use their authority when examining financial institutions subject to supervision, to assess the institution's record of meeting the credit needs of its entire community, including low- and moderate-income neighborhoods. Local institutions keep a good standing in order to continue to grow, thus investment opportunities into small community capital improvements are actively sought be responsible financial institutions. The following lending institutions have local CRA obligations: • Bank of America- Outstanding rating as of 2009 • JP Morgan Chase Bank- Outstanding Rating as of 2007 • Rabobank- Satisfactory Rating as of 2009 • Union Bank of California- Outstanding Rating as of 2009 • Wells Fargo- Outstanding Rating as of 2008 Public Financial Institutions North American Development Bank (NADBank)- NADBank is a binational financial institution capitalized and governed equally by the United States and Mexico for the purpose of financing environmental projects certified by the Border Environment Cooperation Commission (BECC). The two institutions work together with communities and project sponsors in both countries to develop and finance infrastructure necessary for a clean and healthy environment for border residents. NADB can make loans to public and private borrowers, at market and low-interest rates, for the implementation of environmental infrastructure projects located in the U.S.-Mexico border region. Loans are available for the implementation of projects in all environmental sectors in which the NADBank operates. California Infrastructure and Economic Development Bank (IBank)- The Infrastructure State Revolving Fund (ISRF) Program provides low-cost financing to public agencies for a wide variety of infrastructure projects. ISRF Program funding is available in amounts ranging from $250,000 to $10,000,000, with loan terms of up to 30 years. Interest rates are set on a monthly basis. Preliminary applications are continuously accepted. Federal Grant Agencies USDA Rural Utility Service Program- USDA Rural Development provides funding opportunities in the form of payments, grants, loans, and loan guarantees, for the development and commercialization of vital utility services. These programs Page | 116 Heber Public Utility District Service Area Plan Financing Plan January 2018 revitalize rural communities with a variety of infrastructure improvements, and create sustainable opportunities for wealth, new jobs, and increased economic activity in rural America. Utilities programs connect rural residents to the global economy by developing rural water and wastewater systems to help address water quality, amongst other infrastructure projects. U.S. Environmental Protection Agency (EPA)- EPA’s mission is to protect human health and the environment. Nearly half of their budget goes is used towards grants to state environmental programs, non-profits, educational institutions, and others. The funds are used for a wide variety of projects, from scientific studies that assist in EPA making decisions to community cleanups. Overall, grants assist EPA in achieving their overall mission: protect human health and the environment. EPA’s Border Water Infrastructure Program provides grant assistance to communities along the U.S./Mexico border to develop and construct infrastructure to provide safe drinking water and adequate sanitation, and to improve water quality in shared and trans-boundary waters. EPA funds grant programs through the Border Environmental Cooperation Commission created in 1993 under a side agreement to the North American Free Trade Agreement (NAFTA) for the purpose of enhancing the environmental conditions of the US- Mexico border region. BECC and NADBank work closely with other border stakeholders including federal, state, and local agencies, the private-sector and civil society to identify, develop, finance and implement environmental infrastructure projects on both sides of the US-Mexico border. BECC focuses on the technical, environmental, and social aspects of project development, while NADBank concentrates on project financing and oversight for project implementation. Three Grant Programs available through BECC are the Community Assistance Program (CAP), the Project Development Assistance Program (PDAP) and Border Environmental Infrastructure Fund (BEIF) as follows: • Community Assistance Program (CAP): The Community Assistance Program is administered through BECC and funds smaller shovel-ready projects up to $500,000. Funded with NADB’s retained earnings, this program offers grant financing to support the implementation of projects sponsored by public entities in all environmental sectors eligible for NADB financing. The objective of this program is to support the implementation of critical environmental infrastructure projects for sponsors with limited capacity to incur debt. • Project Development Assistance Program (PDAP): Funding is available for project development activities necessary for certification of projects including, but not limited to planning studies, environmental assessment, final design, financial feasibility, community participation, and development Page | 117 Heber Public Utility District Service Area Plan Financing Plan January 2018 of sustainability elements. Final design grant assistance is limited to 50% of the final design costs and cannot exceed $500,000. • Border Environmental Infrastructure Fund (BEIF): Grants are intended to supplement funding from other sources in order to complete a project’s financial package. Applicants must seek other sources of funding since BEIF is considered to be the funding of last resort. Actual BEIF participation is considered on a project-by-project basis and determined according to funding availability and based on an affordability analysis to be conducted by NADBank during project development. State Grant Agencies State Water Resources Control Board- The Division of Financial Assistance (DFA) administers the implementation of the State Water Resources Control Board’s (State Water Board) financial assistance programs that include loan and grant funding for construction of municipal sewage and water recycling facilities, remediation for underground storage tank releases, watershed protection projects, nonpoint source pollution control projects, and other similar projects. The State Water Resource Control Board administers the Clean Water State Revolving Fund (CWSRF), the Drinking Water State Revolving Fund and Small Community Wastewater Grant (SCWG) Programs. More information on each Program is found below. • Clean Water State Revolving Fund Program (CWSRF)- The Clean Water State Revolving Fund Program accepts applications on a continuous basis. The Federal Water Pollution Control Act (Clean Water Act or CWA), as amended in 1987, established the Clean Water State Revolving Fund (CWSRF) program. The CWSRF program offers low interest financing agreements for water quality projects. Annually, the program disburses between $200 and $300 million to eligible projects. • Drinking Water State Revolving Fund Program (DWSRF)- The Drinking Water State Revolving Funds Program was established by the 1996 amendments to the Safe Drinking Water Act (SDWA). The DWSRF is a financial assistance program to help water systems and states to achieve the health protection objectives of the SDWA. The state DWSRFs have provided more than $32.5 billion to water systems through 2016. Small disadvantaged communities can obtain up to 100% grant funding for eligible projects. • Small Community Wastewater Grant (SCWG)- The Small Community Wastewater Grant Program was created to aid small, financially disadvantaged communities in correcting public health and water quality problems. The SCWG Program originally received funding through the Clean Water Bond Law of 1984, but has relied on several additional funding Page | 118 Heber Public Utility District Service Area Plan Financing Plan January 2018 propositions to continue to assist small communities with water quality needs. Priority is given to small disadvantaged communities which have a significant water quality investment with wastewater rates of at least 1.5% of the communities MHI. Small disadvantaged communities can obtain up to 100% grant funding for eligible projects. California Department of Housing and Community Development- The State Community Development Block Grant (CDBG) program was established by the federal Housing and Community Development Act of 1974, as amended (42 USC 5301, et sequentia). The State CDBG program is implemented by California Health and Safety Code section 50825, et sequentia, and the California Code of Regulations (Title 25, Section 7050, et sequentia). The primary federal objective of the CDBG program is the development of viable urban communities by providing decent housing and a suitable living environment and by expanding economic opportunities, principally for persons of low and moderate income. "Persons of low and moderate income" or the "targeted income group" (TIG) are defined as families, households, and individuals whose incomes do not exceed 80 percent of the county’s median income, with adjustments for family or household size. Each year the program makes funds available to eligible jurisdictions through several allocations. Under the General Allocation, jurisdictions may apply for funding to subsidize public facilities or special assessment districts. Although HPUD would not be able to access the funds directly, it may do so under an agreement with the County of Imperial. 5.4 FACILITY FINANCING 5.4.1 Administrative Facilities Current Funding The existing administrative facilities are currently owned by the County of Imperial and jointly used by Heber Public Utility District. The primary sources of revenue for a portion of the operation and maintenance of the administrative facilities are water and sewer user fees, as the District’s primary function is the provision of wastewater and potable water services. Although not a significant source, some administrative costs are also generated from property taxes and/or other miscellaneous revenue. Page | 119 Heber Public Utility District Service Area Plan Financing Plan January 2018 5-A Administration Resources Miscellaneous Revenue Resources Revenues/Fee Collected Royalties/Geothermal $4,000 Franchise Fee/Community Benefit (CR&R) $2,000 Administrative Charges $3,000 Source: 2017/2018 Adopted Budget Cost Avoidance Opportunities The District’s administrative offices operate and shall continue to operate under a lease agreement with Imperial County until which time the HPUD is able to find or construct a comparable facility. The District and Imperial County will continue to share the Heber Essential Services Building which includes a fire station, sheriff’s office, library station and conference area. Sharing facilities is an adequate cost savings measure for the District at this time. Administrative service costs are further reduced by outsourcing some other administrative services including Attorney, Engineer, and special Project Managers. Recommended Funding Existing funding sources will continue to be used to support administrative services and facilities. The District will continue to use water and user fees to offset the maintenance and operation of the administrative facilities operated by the District. Development Impact fees may become a key source of funding for capital facilities in the future as deemed necessary by the District for the acquisition or development of a new administrative building. The USDA Rural Assistance Programs for Community Facilities would be a viable source for financing options. 5.4.2 Wastewater Facilities Current Funding The primary sources of revenue for wastewater facilities are development impact fees and user fees with nominal additional revenues collected from property taxes. Development impact fees (capacity fees) which have been collected over the years are only a revenue source for capital improvements to wastewater facilities and are currently established at $6,660 for residential connections (4” connection) as adopted in July of 2017 (6” and 8” connections are $14,653 and $26,642, respectively) while user fees are used to replace smaller capital needs and equipment. The current wastewater user fees were last updated on July of 2017 (via Resolution 2017-4). Another current funding source for wastewater facilities has been grant funding. The District was successful in securing $5,000,000 in Forgivable Loan Funds from the Clean Water State Revolving Fund through the Page | 120 Heber Public Utility District Service Area Plan Financing Plan January 2018 California Water Resource Control Board and $5,411,131 in subsidized loan funds at 0% over a thirty-year term. The funding was used for WWTP rehabilitation and capital improvement needs. The loan is being paid off with impact fees and user fees. The following table provides an overview of the 2017 user fees for sewer facilities which will incrementally increase through FY 2021-2022: 5-B Sewer Fees Customer Classification monthly fee Average Single-Family Customer (=1 EDU) $52.66 Average Multi-Family, per Unit $52.66 Small Commercial Customer, 4” Connection $49.66* Average Commercial Customer, 6” Connection $109.25* Large Commercial Customer, 8” Connection $198.64* * Non-residential uses are assessed the base fee noted plus a volumetric charge of $0.57 per 1,000 gallons of water used. Source: Ordinance 2017-4 Modifying Wastewater Rates Effective July 1, 2017 Cost Avoidance Opportunities The District requires developers to construct wastewater-related infrastructure that will connect the specific development with the existing wastewater treatment system. This requirement helps the District avoid substantial costs associated with infrastructure development. Recommended Funding The District will continue to use the financing mechanisms described above. User fees will continue to finance the wastewater operation, maintenance, salaries, and equipment costs. The District will continue to use user fees and capacity fees to finance the City’s water service and capital improvement needs as well as ongoing operation and maintenance. Although not anticipated, any additional, major capital investments associated with the rehabilitation of equipment, or Regional Water Quality Board upgrade demands, are expected to require financing assistance. The HPUD generally qualifies for subsidized financing. 5.4.3 Water Facilities Current Funding The primary sources of revenue for water treatment and distribution facilities are the water service charges and water connection fees collected and deposited into the Water Fund. Development impact fees (capacity fees) which have been collected over the years are the only current revenue source for capital improvements to water facilities and are currently established at $3,087 per single family residential (1” diameter connection or less) and on an increasing scale per Page | 121 Heber Public Utility District Service Area Plan Financing Plan January 2018 dimeter connection as adopted in July of 2017. User fees are collected for the continued operation and maintenance. The current user fees were last updated in 2017 (via Resolution 2017-3). Another current funding source for water treatment facilities has been grant funding. The District was successful in securing a $5,000,000 forgivable loan from the Safe Drinking Water State Revolving Fund through the California Water Resource Control Board and $4,850,000 in subsidized loan funds at 0% over a thirty-year term. The funding was used for rehabilitation and improvement needs, including capacity demand. The loan is being paid off with impact fees and user fees. Similar to all other California jurisdictions, strict water conservation efforts are encouraged throughout the Heber community which has resulted in lower demands. The Districts service fees are based on a base fee with a specified consumption allotment and a volumetric charge thereafter. The following table provides an overview of the 2017 user fees for water facilities which will marginally increase through FY 2021-2022: 5-C Water Fees Customer Classification Water Fixed Meter Allotment Fee (Gallons) Average Single-Family Customer (=1 EDU) 15,000 $55.54 Multi-Family 1” Meter 15,000 $62.39 2” Meter 40,000 $194.71 3” Meter 60,000 $408.95 Commercial/Industrial/Public 1” Meter 15,000 $62.39 2” Meter 40,000 $194.71 3” Meter 60,000 $408.95 4” Meter 75,000 $715.73 Service Outside District Boundaries 1” Meter 15,000 $70.07 2” Meter 30,000 $163.42 * Any customer within the District using more than the water allotment is charge a volumetric fee of $3.51 per 1,000 gallons ($4.16 for outside District customers). Source: Ordinance 2017-3 Modifying Water Rates Effective July 1, 2017 Cost Avoidance Opportunities The District requires developers to construct water-related infrastructure that will connect the specific development to District services. This requirement helps the Page | 122 Heber Public Utility District Service Area Plan Financing Plan January 2018 District avoid substantial costs associated with new infrastructure development needs. Recommended Funding The District will continue to utilize these funding sources in addition to searching for other sources to improve the existing water treatment and distribution system and to meet future demands and capital improvement goals. The user fees will be used to pay the recently acquired subsidized infrastructure loan. As previously noted, the District will continue to adjust rates annually through FY 2021/2022. The Capacity Fees will continue to be collected as new development occurs. Although not expected, any major capital investments associated with the significant rehabilitation of equipment, or upgrade demands from the Department of Public Health may require loan funding. The HPUD generally qualifies for subsidized financing from available loan programs. 5.4.4 Park Facilities Current Funding The primary sources of revenue for park facilities are property taxes, followed by the Community Facilities District (CFD) established by the County of Imperial for McCabe Ranch I. An approximate $200,000 is received annually from these two sources, however, it warrants to note that of the funds collected, $65,000 annually are solely for the improvement of the McCabe Ranch I CFD community park and cannot be invested in any other park. The following table identifies all park funding resources available to the District. 5-D Park Funding Revenues Administrative Service Annual Revenues CFD’s & LLD $ 77,000 Property Tax $525,000 Park User Fees $ 3,000 Source: 2017/2018 Adopted Budget Cost Avoidance Opportunities Currently, all new development must incorporate park facilities as a County established development standard. This County driven development standard Page | 123 Heber Public Utility District Service Area Plan Financing Plan January 2018 eliminates the need for the District to provide recreational facilities. Under these development standards, the District is not responsible for the purchase or dedication of land or for park improvements. The District further has a Cost Recovery Ordinance to help offset any incurred costs during planning and permitting. Continued operation and maintenance costs for parks should be planned for and collected through the establishment of Community Facilities Districts. Heber Public Utility District and the County of Imperial will jointly continue to use these cost avoidance measures. Recommended Funding The District will continue to use the existing financing mechanisms described above to finance the District’s continued improvement, operation and maintenance of parkland. As new development occurs, the formation of additional CFD’s may be needed as well. The collected property tax contribution is not significant enough for the capital improvement needs or continued maintenance costs of the aging parkland in the older Heber Townsite. The District in partnership with Imperial County should seek grant funding opportunities through the Department of Parks and Recreation and other State agencies to improve these areas. 5.4.5 Drainage Facilities Current Funding Within the District Boundary and the Heber sphere of influence, drainage facilities are generally installed and funded by developers as projects are developed. Routine maintenance, operation, and personnel costs are not currently tied to any District Fund nor accounted for through any maintenance agreements. The District does receive property tax revenue that is intended to offset these costs. Cost Avoidance Opportunities The District, in concert with the County of Imperial is able to avoid some costs for the development of new drainage facilities by requiring developers to construct adequate facilities and retention basins for their projects. Drainage facilities that are not deeded to Heber Public Utility District are the continued responsibility of the property owner and/or Imperial County. Recommended Funding Funding responsibilities for project related facilities shall continue to be the responsibility of developers and secured prior to construction in coordination with the County of Imperial. The District should negotiate with Imperial County for Page | 124 Heber Public Utility District Service Area Plan Financing Plan January 2018 continued maintenance of drainage facilities. Another potential revenue source is the establishment of a stormwater assessment district. 5.4.6 Solid Waste Facilities Current Funding Heber Public Utility District does not own any solid waste facilities. Solid waste services are outsourced and provided through CR&R Incorporated and funded through user fee charges. The District additionally collects an administrative fee for invoicing and fee collection services. The District collected an approximate $49,500 for administrative activities during the most recent fiscal year. Per the existing service agreement, the District collects ten percent (10%) of the monthly gross billings as broken down below. Total Revenues for Trash Fund: $512,000.00 Total Payments to CR&R are: $465,500.00 Net Franchise Revenue: $ 49,500.00 Share of HPUD’s Expenses: $44,700.00 Net Operating Revenues: $ 4,800.00 Cost Avoidance Opportunities By using CR & R Incorporated solid waste services, the District is able to avoid high costs related to providing direct solid waste collection and disposal services. The District does not have the means or resources to provide these services directly. By hiring the services of CR & R, the District avoids potential new costs. Recommended Funding Solid waste related services shall continue to be funded through user fee charges. The District does not have the means to provide these services on their own and has opted for the best option available. Page | 125 Heber Public Utility District Service Area Plan References January 2018 References Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000, Government Code §§ 56000 et sequentia . (2000). 2016-17 Student Demographic Data. (2017, October 19). Retrieved from Education Data Partnership: https://www.ed-data.org/ City of Eugene Public Works. (1992). Urban Sanitary Sewer Master Plan. County of Imperial. (2011). County of Imperial Municipal Service Review Draft #3. Development Design & Engineering. (2006). Imperial Center Specific Plan. Education Code § 41376, Article 5 enacted by Stats. 1976, Ch. 1010. Flores, R. (2011, February 25). Dogwood Elementary Celebrates Its Grand Opening. Imperial Valley Press. Governor's Office of Planning and Research. (2003). Local Agency Formation Commission Municipal Service Review Guideline. Heber Elementary School District. (2016). 2015-2016 School Accountability Report Card. Heber Elementary School Report. (2017, November 9). Retrieved from California Department of Education Website: https://dq.cde.ca.gov/dataquest/dqcensus/EnrGrdLevels.aspx?cds=13631316008502&agglevel= school&year=2016-17 Heber Public Utilities District. (2016). Resolution 2016-2 Approving an Amendment to the Agreement Between Heber Public Utility District and CR&R. Heber Public Utilities District. (2017). HPUD Adopted Budget Fiscal Year 2017-2018. Heuberger, J. (2010). Imperial Center Staff Report of LAFCO Board. Imperial County Planning and Development Services. (2010). McCabe Ranch II Specific Plan. Imperial County Planning and Development Services Department. (2008). County of Imperial General Plan. Infrastructure Management Services. (2012). County of Imperial Pavement Management Analysis Report. J. Robinson's School Facilities Planning. (2009). School Facilities Needs Analysis. Lin, S. D. (2001). Water and Wastewater Calculations Manual. McGraw-Hill. Page | 126 Heber Public Utility District Service Area Plan References January 2018 Overall Economic Development Commission. (2010). Imperial County Comprehensive Economic Development Strategy 2010-2011. Public Utility District Act, Public Utilities Code §§ 17301 et sequentia (1972). School Facilities Consultants. (2012). School Facilitiy Fee Justification Report for Residential, Commercial and Industrial Development Projects. Semuels, A. (2011, March 9). Census data shed light on California's housing boom -- and bust. Retrieved from Los Angeles Times Blog: http://latimesblogs.latimes.com/money_co/2011/03/census- california-housing.html State of California, Department of Finance. (2017). E-1 Population Estimates of Cities, Counties and the State - January 1, 2016 and 2017. Sacramento, CA. Transpo Group. (2016). Imperial County Safe Routes fo School Regional Master Plan. United States Census Bureau.“Summary File.”2011 – 2015 American Community Survey. U.S. Census Bureau’s American Community Survey Office. (n.d.). US Census Bureau (2010). List of Persons and Agencies Contacted Heber Elementary School District, Juan Cruz, Superintendent Heber Water and Wastewater Treatment Plant, Plant Operators Imperial County Auditor-Controller Office Imperial County Fire Department, Chief Tony Rouhotas, Jr. Imperial County Sherriff’s Office, Athena Chavez and Lieutenant Robert Benavidez Imperial Irrigation District Energy Records Unit Page | 127 Heber Public Utility District Service Area Plan Exhibits January 2018 List of Exhibits Exhibit 1-A Heber Townsite Regional Location Map Exhibit 1-B Existing Heber Public Utility District Boundary Exhibit 1-C Heber Public Utility District Sphere of Influence Exhibit 3-A Heber Urban Area Map Imperial County Land Use Element Exhibit 3-B Imperial County Zoning Map Exhibit 3-C Planned Developments within Heber Public Utility District Sphere of Influence Exhibit 3-D Phasing of Planned Developments Pending Within Heber’s SOI Exhibit 4-A Layout of the Heber Essential Services Building Exhibit 4-B Park and Recreational Facilities Map Exhibit 4-C Existing Wastewater Collection and Sewer Facility Schematic Map Exhibit 4-D Main Collector & Pump Station Wastewater Schematic Map Exhibit 4-E Wastewater Treatment Plant General Design Criteria/Plant Flow Diagram Exhibit 4-F Existing Water Distribution System Exhibit 4-G Proposed Water Treatment Plant Improvements Exhibit 4-H Imperial County Fire Station Location and Service Area Exhibit 4-I Heber Public Utility District Law Enforcement Facilities Location Map Exhibit 4-J Heber Public Utility District Street Classification Map Exhibit 4-K Heber Public Utility District Sidewalk Location Map Exhibit 4-L Heber Public Utility District Drainage Facilities Map Exhibit 4-M Street Lighting System in Heber Exhibit 4-N Heber Public Utility District School Facilities Map Page | 128 Heber Public Utility District Service Area Plan Appendices January 2018 Appendices Appendix A Pavement Management Analysis Appendix B Imperial Center Specific Plan Appendix C Financial Statement Page | 129 Appendix A - Pavement Management Analysis 4275 COOMBS - 4275 3,395 24 9,054 Asphalt Strong 2,565 SC Residential 27 36 43 40 4280 COPPER - 4280 1,312 39 4,015 Asphalt Strong 2,114 SC Residential 40 12 47 39 4285 CORAL - 4285 1,613 23 4,228 Asphalt Strong 1,685 SC Residential 52 11 31 44 4290 CORAL - 4290 313 19 661 Asphalt Strong 1,934 SC Residential 45 20 29 36 4295 CORAL SEA - 4295 753 24 2,007 Asphalt Moderate 1,794 SC Residential 55 16 25 52 4300 CORAL SEA - 4300 2,331 24 5,694 Asphalt Moderate 1,744 SC Residential 56 22 17 52 4305 CORN - 4305 2,655 22 6,490 Asphalt Moderate 2,406 Residential 72 10 18 74 4310 CORNELL - 4310 897 21 2,092 Asphalt Strong 1,863 SC Residential 47 12 29 25 4315 CORONA - 4315 574 28 1,785 Asphalt Strong 1,716 SC Residential 51 12 28 36 4320 CORONADO - 4320 1,148 23 3,162 Asphalt Strong 2,245 SC Residential 36 19 49 47 4325 CORONADO - 4325 637 23 1,661 Asphalt Strong 1,893 SC Residential 46 15 33 38 4330 CORONADO - 4330 392 23 1,001 Asphalt Strong 1,925 SC Residential 45 24 26 37 4335 CORONET - 4335 877 27 2,630 Asphalt Strong 2,679 SC Residential 23 43 49 57 4340 CORONET - 4340 999 24 2,665 Asphalt Strong 1,636 SC Residential 53 0 49 60 4345 CORRELL - 4345 5,286 31 17,597 Asphalt Moderate 1,515 Residential 82 6 4 70 4350 CORVAIR - 4350 508 22 1,241 Asphalt Moderate 3,637 SC Residential 9 64 33 21 4355 CORVINA - 4355 2,277 22 5,913 Asphalt Strong 1,645 SC Residential 53 3 45 59 4360 COUNTRY CLUB - 4360 2,534 23 6,477 Asphalt Moderate 5,479 Residential 36 47 20 45 4365 COUNTY - 4365 2,165 22 5,293 Asphalt Weak 3,267 SC Residential 27 67 17 54 4370 COUNTY - 4370 5,280 24 14,080 Asphalt Moderate 5,325 Collector 24 56 27 40 4375 COUNTY - 4375 3,908 24 10,420 Asphalt Moderate 6,047 Collector 14 69 25 32 4380 COUNTY - 4380 4,085 24 10,895 Asphalt Moderate 2,677 Collector 62 26 17 76 4385 COUNTY - 4385 2,840 33 10,413 Asphalt Moderate 3,505 Collector 50 33 8 35 4390 COUNTY - 4390 1,948 22 4,762 Asphalt Moderate 3,702 Collector 47 36 10 37 4395 COUNTY RD 13 - 4395 5,476 22 13,977 Asphalt Moderate 1,245 Collector 82 5 10 79 4400 COUNTY RD 251/2 - 4400 4,096 24 10,923 Asphalt Weak 5,256 Collector 30 63 20 59 4405 COUNTY RD 2A01 - 4405 2,537 19 5,703 Asphalt Moderate 4,076 Collector 42 47 20 63 4410 COUNTY RD 2A01 - 4410 5,280 24 14,080 Asphalt Moderate 4,506 Collector 36 41 33 59 4415 COUNTY RD 2A01 - 4415 5,280 24 14,080 Asphalt Moderate 5,204 Collector 26 61 23 47 4420 COUNTY RD 2A01 - 4420 2,579 24 6,876 Asphalt Moderate 5,620 Collector 20 62 22 29 4425 COUNTY RD 2A02 - 4425 4,057 24 10,818 Asphalt Weak 4,004 Collector 47 46 20 78 4430 COUNTY RD 2A02 - 4430 5,280 24 14,080 Asphalt Moderate 2,993 Collector 57 40 12 80 4435 COUNTY RD 2A02 - 4435 5,280 24 14,080 Asphalt Moderate 2,203 Collector 69 20 15 80 4440 COUNTY RD 2A02 - 4440 5,150 24 13,734 Asphalt Moderate 2,699 Collector 61 27 17 75 4445 COUNTY RD 2A02 - 4445 5,280 24 14,080 Asphalt Moderate 3,780 Collector 46 36 34 82 4450 COUNTY RD 2A02 - 4450 5,280 24 14,080 Asphalt Moderate 1,350 Collector 81 4 13 79 4455 COUNTY RD 2A02 - 4455 5,710 24 15,227 Asphalt Moderate 1,279 Collector 82 8 9 81 4460 COUNTY RD 2MO1 - 4460 5,280 24 14,080 Asphalt Moderate 6,193 Arterial 38 61 15 70 4465 COUNTY RD 2MO1 - 4465 5,280 24 14,080 Asphalt Moderate 3,416 Arterial 66 28 9 76 4470 COUNTY RD 2MO1 - 4470 2,640 24 7,040 Asphalt Moderate 2,070 Arterial 79 11 7 76 4475 COUNTY RD 2MO1 - 4475 5,280 24 14,080 Asphalt Weak 4,374 Arterial 58 34 10 68 4480 COUNTY RD 2MO1 - 4480 5,280 24 14,080 Asphalt Moderate 4,442 Arterial 56 38 15 77 4485 COUNTY RD 2MO1 - 4485 5,280 24 14,080 Asphalt Moderate 3,596 Arterial 64 28 12 75 4490 COUNTY RD 2MO1 - 4490 4,987 24 13,298 Asphalt Moderate 1,989 Arterial 80 12 10 88 4510 COUNTY RD 8136 - 4510 1,162 23 2,970 Asphalt Moderate 5,225 Collector 25 68 21 58 4515 COUNTY RD B6A - 4515 5,376 24 14,336 Asphalt Moderate 2,057 Collector 71 8 19 69 4520 COUNTY RD BU - 4520 3,753 21 8,748 Asphalt Moderate 3,696 Collector 47 36 21 59 4525 COUNTY RD BW - 4525 2,816 22 6,738 Asphalt Moderate 5,598 Collector 20 69 24 51 4530 BLAIR - 4530 5,266 22 12,287 Asphalt Strong 3,161 Collector 51 16 37 65 4535 COUNTY - 4535 2,868 24 7,648 Asphalt Moderate 4,387 Collector 37 43 26 55 4540 COUNTY RD J - 4540 2,678 21 6,249 Asphalt Moderate 3,380 Arterial 66 14 19 69 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 14 of 57 5065 DIAMOND - 5065 310 22 757 Asphalt Moderate 1,985 SC Residential 50 26 14 35 5070 DIAMOND - 5070 312 23 798 Asphalt Moderate 1,786 SC Residential 55 17 18 38 5075 DIANE - 5075 196 26 566 Asphalt Strong 1,650 SC Residential 53 10 26 34 5080 DIAS - 5080 1,002 31 3,451 Asphalt Moderate 1,734 SC Residential 57 13 24 48 5085 DIAS - 5085 402 30 1,338 Asphalt Strong 1,826 SC Residential 48 11 36 41 5090 DICKERMAN - 5090 5,104 24 13,063 Asphalt Moderate 740 Collector 89 0 8 87 5095 DICKERMAN - 5095 5,315 24 13,589 Asphalt Moderate 1,474 Collector 79 1 21 84 5100 DIEHL - 5100 5,146 24 13,723 Asphalt Strong 4,051 Collector 38 30 43 63 5105 DIEHL - 5105 2,688 20 5,973 Asphalt Moderate 4,503 Collector 36 38 38 63 5110 DIEHL - 5110 5,275 24 14,067 Asphalt Weak 5,399 Collector 28 59 23 53 5115 DIETRICH - 5115 5,280 24 14,080 Asphalt Moderate 3,048 Collector 56 29 20 72 5120 DIETRICH - 5120 5,280 24 14,080 Asphalt Weak 3,225 Collector 57 36 16 78 5125 DIETRICH - 5125 5,736 24 15,296 Asphalt Moderate 2,709 Collector 61 26 15 70 5130 DIONE - 5130 521 18 1,042 Asphalt Strong 2,023 SC Residential 42 10 49 48 5135 DIONE - 5135 3,584 26 9,979 Asphalt Strong 1,757 SC Residential 50 7 41 49 5140 DIONE - 5140 1,093 61 4,552 Asphalt Strong 2,465 SC Residential 30 18 54 35 5145 DIONE - 5145 333 24 889 Asphalt Strong 1,083 SC Residential 69 0 0 9 5150 DIONE - 5150 1,777 52 6,861 Asphalt Strong 2,023 SC Residential 42 19 40 48 5155 DIONE - 5155 189 24 503 Asphalt Strong 2,092 SC Residential 40 16 38 32 5160 DOGWOOD - 5160 5,398 24 14,395 Asphalt Moderate 644 Arterial 94 0 2 88 5165 DOGWOOD - 5165 5,267 24 14,045 Asphalt Moderate 766 Arterial 92 0 4 89 5170 DOGWOOD - 5170 5,406 24 14,416 Asphalt Weak 5,327 Arterial 49 42 21 78 5175 DOGWOOD - 5175 2,660 21 6,206 Asphalt Moderate 6,338 Arterial 37 55 23 72 5180 DOGWOOD - 5180 5,264 24 13,164 Asphalt Moderate 6,388 Arterial 36 51 21 57 5185 DOGWOOD - 5185 2,639 24 7,036 Asphalt Strong 5,963 Arterial 37 31 39 56 5190 DOGWOOD - 5190 4,883 24 13,022 Asphalt Weak 2,962 Arterial 72 25 4 78 5195 DOGWOOD - 5195 5,288 24 13,218 Asphalt Weak 6,113 Arterial 42 59 14 78 5200 DOGWOOD - 5200 2,643 24 7,048 Asphalt Weak 5,606 Arterial 47 59 10 84 5205 DOGWOOD - 5205 5,278 24 14,074 Asphalt Moderate 1,028 Arterial 90 5 3 88 5210 DOGWOOD - 5210 2,641 23 6,748 Asphalt Moderate 670 Arterial 93 1 1 87 5215 DOGWOOD - 5215 5,281 24 14,084 Asphalt Moderate 2,526 Collector 64 15 26 77 5220 DOGWOOD - 5220 2,642 21 6,164 Asphalt Moderate 2,719 Collector 61 24 23 82 5225 DOGWOOD - 5225 5,252 24 14,006 Asphalt Moderate 1,088 Collector 84 2 12 81 5230 DOGWOOD - 5230 5,280 24 14,080 Asphalt Moderate 1,568 Arterial 84 0 17 90 5235 DOGWOOD - 5235 5,288 24 14,102 Asphalt Moderate 1,875 Arterial 81 0 22 91 5240 DOGWOOD - 5240 5,275 24 14,068 Asphalt Moderate 1,039 Arterial 90 0 4 79 5245 DOGWOOD - 5245 5,339 24 14,236 Asphalt Moderate 1,150 Arterial 88 0 7 82 5250 DOGWOOD - 5250 5,302 24 14,138 Asphalt Moderate 1,114 Arterial 89 0 6 80 5255 DOGWOOD - 5255 1,319 24 3,518 Asphalt Moderate 2,244 Arterial 78 9 14 81 5260 DOLPHIN - 5260 892 21 2,081 Asphalt Weak 2,889 SC Residential 36 52 19 53 5265 DOLPHIN - 5265 1,411 21 3,293 Asphalt Moderate 2,873 SC Residential 28 58 18 38 5270 DOLPHIN - 5270 4,926 23 12,770 Asphalt Strong 2,044 SC Residential 42 24 36 48 5275 DOLPHIN - 5275 3,256 23 8,232 Asphalt Strong 2,220 SC Residential 37 22 47 51 5280 DOLPHIN DV - 5280 1,246 22 3,080 Asphalt Strong 1,847 SC Residential 47 19 35 55 5285 DON - 5285 1,035 34 3,911 Asphalt Moderate 1,010 SC Residential 75 6 16 70 5290 DONNER - 5290 307 25 852 Asphalt Moderate 2,022 SC Residential 49 20 23 38 5295 DOROTHEA - 5295 1,854 26 4,398 Asphalt Strong 2,289 SC Residential 35 24 36 26 5300 DOVE - 5300 466 29 1,500 Asphalt Moderate 6,320 Residential 26 47 35 42 5305 DOVER - 5305 87 28 271 Asphalt Moderate 1,163 SC Residential 71 0 22 59 5310 DREW - 5310 6,412 24 17,098 Asphalt Strong 5,347 Arterial 44 26 33 54 5315 DREW - 5315 5,343 24 12,745 Asphalt Strong 6,096 Arterial 36 14 54 46 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 17 of 57 5830 EVAN HEWES WHY - 5830 2,449 24 6,530 Asphalt Moderate 2,790 Arterial 72 14 13 72 5835 EVANS - 5835 406 21 947 Asphalt Strong 1,496 SC Residential 57 12 22 41 5840 EXT SALTON - 5840 1,451 23 3,707 Asphalt Moderate 1,008 SC Residential 75 0 25 76 5845 F - 5845 1,969 26 5,542 Asphalt Moderate 6,581 Residential 23 63 15 25 5850 FAIRLANE - 5850 1,361 26 3,761 Asphalt Strong 5,050 Residential 37 26 33 31 5855 FAIRWAY - 5855 722 36 2,890 Asphalt Moderate 2,512 Residential 70 0 23 59 5860 FALCON - 5860 511 22 1,250 Asphalt Moderate 2,705 SC Residential 32 45 13 17 5865 FARNSWORTH - 5865 1,974 23 5,045 Asphalt Moderate 4,677 Residential 45 26 36 62 5870 FAWCETT - 5870 5,282 22 12,586 Asphalt Moderate 5,045 Residential 41 43 22 56 5875 FERREL - 5875 4,916 24 13,111 Asphalt Strong 4,433 Collector 32 37 40 54 5880 FERRELI - 5880 2,640 24 7,040 Asphalt Weak 5,718 Collector 24 72 21 62 5885 FERRELI - 5885 2,697 24 7,191 Asphalt Moderate 3,454 Collector 51 29 27 69 5890 FERRELI - 5890 5,378 24 14,342 Asphalt Moderate 3,085 Collector 56 29 21 71 5895 FERRELI - 5895 2,079 23 5,314 Asphalt Moderate 3,880 Collector 45 32 32 66 5900 FIGUEROA - 5900 307 24 817 Asphalt Moderate 1,099 SC Residential 73 6 15 60 5905 FILLMORE - 5905 2,780 24 7,447 Asphalt Moderate 3,100 SC Residential 23 46 33 26 5910 FILLMORE - 5910 1,116 23 2,851 Asphalt Strong 1,539 SC Residential 56 10 35 61 5915 FIREWOOD - 5915 1,356 34 4,411 Asphalt Strong 1,589 SC Residential 55 5 40 58 5920 FISHER - 5920 1,291 18 2,582 Asphalt Moderate 4,920 Collector 30 43 36 49 5925 FLAME - 5925 1,392 23 3,558 Asphalt Moderate 2,715 SC Residential 32 35 36 41 5930 FLAMINGO - 5930 1,647 25 4,515 Asphalt Strong 2,028 SC Residential 42 19 39 45 5935 FLAMINGO - 5935 600 24 1,601 Asphalt Strong 1,974 SC Residential 44 15 45 54 5940 FLEMING - 5940 5,246 22 12,531 Asphalt Moderate 3,873 Collector 45 49 18 71 5945 FLEMING - 5945 5,272 22 12,305 Asphalt Weak 4,675 Collector 38 51 23 66 5950 FLOOD - 5950 4,861 23 12,270 Asphalt Moderate 6,907 Arterial 31 41 32 42 5955 FLOOD - 5955 4,230 21 9,716 Asphalt Strong 7,010 Arterial 26 43 38 44 5960 FLOOD - 5960 1,210 23 3,091 Asphalt Moderate 2,736 Arterial 73 15 13 75 5965 FORRESTER - 5965 5,262 24 13,740 Asphalt Strong 6,121 Arterial 36 32 41 57 5970 FORRESTER - 5970 5,280 30 15,040 Asphalt Moderate 1,600 Arterial 84 0 15 85 5975 FORRESTER - 5975 5,503 24 14,674 Asphalt Moderate 3,478 Arterial 65 12 26 76 5980 FORRESTER - 5980 5,212 24 13,899 Asphalt Moderate 5,340 Arterial 47 45 13 60 5985 FORRESTER - 5985 5,341 24 14,242 Asphalt Weak 7,697 Arterial 27 74 14 60 5990 FORRESTER - 5990 5,280 24 14,080 Asphalt Moderate 1,850 Arterial 82 0 18 82 5995 FORRESTER - 5995 2,627 24 7,004 Asphalt Moderate 2,757 Arterial 72 19 9 75 6000 FORRESTER - 6000 2,671 30 8,904 Asphalt Moderate 5,796 Arterial 42 45 20 61 6005 FORRESTER - 6005 5,307 24 14,151 Asphalt Moderate 3,532 Arterial 65 12 20 63 6010 FORRESTER - 6010 4,326 25 12,212 Asphalt Moderate 5,608 Arterial 44 42 19 59 6015 FORRESTER - 6015 5,280 24 14,080 Asphalt Weak 4,333 Arterial 59 37 11 76 6020 FORRESTER - 6020 3,842 24 10,246 Asphalt Moderate 4,754 Arterial 52 37 21 78 6025 FORRESTER - 6025 5,373 30 16,149 Asphalt Moderate 5,644 Arterial 44 49 19 72 6030 FORRESTER - 6030 4,675 25 12,761 Asphalt Weak 6,740 Arterial 36 58 19 67 6035 FORRESTER - 6035 5,257 25 14,602 Asphalt Weak 7,010 Arterial 33 63 20 70 6040 FORRESTER - 6040 5,280 24 14,080 Asphalt Moderate 4,897 Arterial 51 37 26 83 6045 FORRESTER - 6045 5,889 25 16,060 Asphalt Weak 5,882 Arterial 44 52 14 71 6050 FORRESTER - 6050 5,556 26 15,463 Asphalt Weak 7,004 Arterial 33 74 10 73 6055 FORRESTER - 6055 2,634 24 7,025 Asphalt Moderate 2,736 Arterial 73 21 4 69 6060 FORRESTER - 6060 2,583 21 6,028 Asphalt Moderate 2,240 Collector 68 7 25 71 6065 FORRESTER - 6065 5,280 24 14,080 Asphalt Moderate 438 Collector 94 0 0 84 6070 FORRESTER - 6070 3,368 24 9,125 Asphalt Moderate 530 Collector 92 1 0 82 6075 FOSTER - 6075 2,647 25 7,354 Asphalt Weak 5,330 Collector 29 69 18 63 6080 FR. RD. NO.1 - 6080 3,179 23 8,123 Asphalt Moderate 4,017 Collector 43 41 25 65 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 20 of 57 6850 HAVEN - 6850 3,857 23 9,856 Asphalt Strong 4,638 Collector 29 39 48 63 6855 HAVEN - 6855 3,082 24 7,890 Asphalt Moderate 3,450 Residential 59 14 28 65 6860 HAVENS - 6860 5,583 24 14,887 Asphalt Moderate 3,374 Collector 52 28 28 71 6865 HAWK - 6865 1,049 42 4,925 Asphalt Moderate 1,013 Residential 88 0 4 74 6870 HAWK - 6870 1,397 43 6,676 Asphalt Moderate 5,715 Residential 33 54 12 35 6875 HAWK - 6875 1,347 43 6,505 Asphalt Moderate 6,413 Residential 25 59 20 35 6880 HAYES - 6880 267 25 742 Asphalt Strong 1,889 SC Residential 46 18 39 55 6885 HEBER - 6885 351 20 780 Asphalt Moderate 6,790 Residential 20 62 21 28 6890 HEBER - 6890 1,144 25 3,177 Asphalt Moderate 2,637 Residential 69 19 10 69 6895 HEBER - 6895 1,160 30 3,055 Asphalt Moderate 6,299 Residential 26 64 14 35 6900 HEBER - 6900 1,826 55 10,702 Asphalt Moderate 6,097 Residential 28 39 36 38 6905 HEBER - 6905 260 60 1,734 Asphalt Strong 3,682 Residential 54 0 42 49 6910 HEBER - 6910 538 60 3,587 Asphalt Moderate 1,732 Residential 80 0 13 67 6915 HEBER - 6915 5,344 24 14,251 Asphalt Moderate 1,815 Collector 74 1 28 83 6920 HEBER - 6920 2,722 25 7,561 Asphalt Moderate 3,849 Collector 45 33 34 73 6925 HEBER - 6925 5,429 24 14,882 Asphalt Weak 5,720 Arterial 46 54 12 74 6930 HEBER - 6930 5,401 24 14,403 Asphalt Weak 5,583 Arterial 47 55 13 84 6935 HEBER - 6935 5,258 24 14,020 Asphalt Moderate 1,950 Arterial 81 20 1 86 6940 HEBER - 6940 2,640 24 7,040 Asphalt Weak 5,239 Arterial 50 58 2 75 6945 HEBER - 6945 2,640 24 7,040 Asphalt Moderate 1,318 Arterial 87 9 2 84 6950 HEBER - 6950 5,280 24 14,080 Asphalt Moderate 2,908 Arterial 71 17 16 81 6955 HEBER - 6955 5,275 24 14,067 Asphalt Moderate 3,077 Arterial 69 7 27 80 6960 HEBER - 6960 4,398 24 11,727 Asphalt Moderate 1,292 Collector 82 1 17 81 6965 HEBER - 6965 2,996 23 7,574 Asphalt Moderate 2,940 Collector 58 23 22 66 6970 HEBER - 6970 3,085 20 6,856 Asphalt Moderate 4,656 Collector 33 52 19 48 6975 HEBER - 6975 2,488 20 5,529 Asphalt Moderate 3,127 Collector 55 34 15 67 6980 HEFFERNAN - 6980 2,669 26 7,537 Asphalt Moderate 2,583 Residential 70 15 8 57 6985 HEFFERNAN - 6985 393 25 1,091 Asphalt Moderate 1,724 Residential 80 11 3 68 6990 HEFFERNAN - 6990 377 26 1,088 Asphalt Moderate 1,319 Residential 84 8 1 72 6995 HEIL - 6995 377 30 1,258 Asphalt Moderate 7,308 Residential 14 68 29 38 7000 HELEN - 7000 315 25 876 Asphalt Moderate 1,903 SC Residential 52 23 14 34 7005 HELEN - 7005 316 26 912 Asphalt Moderate 3,000 SC Residential 25 45 34 36 7010 HELENA - 7010 1,794 30 6,326 Asphalt Strong 2,031 SC Residential 42 3 55 45 7015 HELENA - 7015 678 28 2,109 Asphalt Strong 1,165 SC Residential 67 0 31 65 7020 HELLEN - 7020 623 27 1,800 Asphalt Strong 2,088 SC Residential 40 11 45 36 7025 HEMET - 7025 929 24 2,477 Asphalt Strong 1,969 SC Residential 44 13 51 63 7030 HENSHAW - 7030 372 26 1,075 Asphalt Strong 1,866 SC Residential 47 22 32 51 7035 HENSHAW - 7035 1,121 24 2,989 Asphalt Strong 1,083 SC Residential 69 0 0 9 7040 HENSHAW - 7040 360 25 999 Asphalt Strong 1,219 SC Residential 65 0 29 55 7045 HERMOSA - 7045 885 24 2,359 Asphalt Strong 1,845 SC Residential 47 14 40 53 7050 HERMOSA - 7050 171 24 455 Asphalt Strong 1,781 SC Collector 29 11 66 42 7055 HETZEL - 7055 4,926 24 13,137 Asphalt Moderate 3,513 Collector 50 23 31 62 7060 HIGHLINE - 7060 5,280 24 14,080 Asphalt Moderate 5,148 Collector 26 67 24 63 7065 HIGHLINE - 7065 2,640 24 7,040 Asphalt Moderate 5,358 Collector 23 67 27 61 7070 HIGHLINE - 7070 5,280 24 14,080 Asphalt Strong 2,716 Collector 58 6 43 76 7075 HIGHLINE - 7075 5,297 23 13,822 Asphalt Moderate 3,524 Collector 50 29 30 73 7080 HIGHLINE - 7080 5,202 25 14,164 Asphalt Strong 2,753 Collector 58 5 40 66 7085 HIGHLINE - 7085 2,722 24 7,259 Asphalt Strong 2,556 Collector 61 0 43 70 7090 HIGHLINE - 7090 4,127 24 11,007 Asphalt Moderate 1,265 Collector 82 15 9 96 7095 HIGHLINE - 7095 5,175 25 14,374 Asphalt Moderate 993 Collector 86 11 6 92 7100 HIGHLINE - 7100 5,304 25 14,439 Asphalt Moderate 4,804 Collector 31 47 33 59 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 24 of 57 7615 INGRAM - 7615 200 24 533 Asphalt Moderate 4,554 Residential 46 46 1 35 7620 INTERNATIONAL - 7620 434 26 1,254 Asphalt Strong 2,738 Residential 66 0 26 52 7625 INTERNATIONAL - 7625 399 25 1,108 Asphalt Strong 4,089 Residential 49 19 24 35 7630 INTERNATIONAL - 7630 1,209 25 3,358 Asphalt Strong 5,307 Residential 34 23 46 40 7635 INTERNATIONAL - 7635 411 25 1,142 Asphalt Strong 4,301 Residential 46 13 37 42 7640 INTERNATIONAL - 7640 5,327 23 13,320 Asphalt Moderate 2,846 Collector 59 19 21 60 7645 IRIDESCENT - 7645 428 24 1,143 Asphalt Strong 1,535 SC Residential 56 1 37 48 7650 IRIDESCENT - 7650 1,160 23 2,998 Asphalt Moderate 3,351 SC Residential 16 71 17 26 7655 IRONWOOD - 7655 1,315 24 3,434 Asphalt Moderate 4,838 Residential 43 51 4 42 7660 ISIS - 7660 439 24 1,172 Asphalt Moderate 3,343 Residential 61 18 15 50 7665 ISIS - 7665 1,608 24 4,198 Asphalt Moderate 5,584 Residential 34 34 40 55 7670 ISIS - 7670 409 22 999 Asphalt Strong 2,535 Residential 68 0 24 56 7675 JACKSON - 7675 395 30 1,315 Asphalt Moderate 468 SC Residential 88 4 0 74 7680 JACKSON - 7680 5,284 24 14,091 Asphalt Moderate 1,399 Collector 80 0 16 75 7685 JACUMBA - 7685 381 26 1,100 Asphalt Strong 1,621 SC Residential 54 4 36 44 7690 JASON - 7690 1,153 23 2,947 Asphalt Strong 1,965 SC Residential 44 13 49 58 7695 JASPER - 7695 5,319 24 14,183 Asphalt Weak 4,377 Collector 42 39 28 65 7700 JASPER - 7700 2,729 24 7,278 Asphalt Moderate 4,274 Collector 39 38 32 62 7705 JASPER - 7705 5,207 24 13,885 Asphalt Moderate 5,212 Collector 26 53 29 45 7710 JASPER - 7710 5,290 24 14,107 Asphalt Moderate 1,582 Collector 77 2 23 85 7715 JASPER - 7715 5,244 24 13,984 Asphalt Moderate 1,018 Collector 85 13 0 85 7720 JASPER - 7720 5,293 24 14,113 Asphalt Moderate 3,705 Collector 47 43 20 72 7725 JASPER - 7725 5,111 20 11,634 Asphalt Moderate 5,549 Collector 21 53 35 42 7730 JEFFERSON - 7730 1,218 25 3,347 Asphalt Moderate 3,000 SC Residential 25 59 11 18 7735 JEFFERSON - 7735 2,650 24 6,964 Asphalt Strong 2,231 SC Residential 36 27 28 22 7740 JEFFERSON - 7740 600 26 1,735 Asphalt Moderate 1,400 SC Residential 65 19 8 52 7745 JEFFERY - 7745 2,777 23 7,184 Asphalt Moderate 3,162 Collector 55 24 27 69 7750 JEFFERY - 7750 3,885 24 10,359 Asphalt Moderate 2,763 Collector 61 13 32 74 7755 JEFFERY - 7755 2,619 24 6,984 Asphalt Moderate 4,481 Collector 36 42 29 56 7760 JESTER - 7760 866 26 2,501 Asphalt Strong 2,254 SC Residential 36 13 59 53 7765 JOHNSON - 7765 2,226 24 5,936 Asphalt Strong 2,559 SC Residential 27 45 29 31 7770 JOHNSON - 7770 584 24 1,557 Asphalt Strong 1,083 SC Residential 69 0 0 9 7775 JOHNSON - 7775 1,668 24 4,449 Asphalt Strong 1,083 SC Residential 69 0 0 9 7780 JORETTA - 7780 340 24 906 Asphalt Moderate 1,470 SC Residential 63 17 11 49 7785 JUDY - 7785 621 25 1,691 Asphalt Moderate 1,164 SC Residential 71 10 15 64 7790 JUDY - 7790 1,437 30 4,193 Asphalt Moderate 2,915 SC Residential 27 55 19 32 7795 JUDY - 7795 1,039 34 3,924 Asphalt Moderate 1,321 SC Residential 67 2 30 69 7800 JUNIUS - 7800 406 25 1,127 Asphalt Strong 1,716 SC Residential 51 4 37 39 7805 JUPITER - 7805 756 24 2,015 Asphalt Strong 1,667 SC Residential 52 11 29 39 7810 KAHOOLAWE - 7810 497 25 1,381 Asphalt Strong 1,203 SC Residential 66 0 26 52 7815 KAHOOLAWE - 7815 160 26 462 Asphalt Strong 1,811 SC Residential 48 0 40 28 7820 KAISER - 7820 5,255 24 13,723 Asphalt Moderate 3,666 Collector 48 42 21 73 7825 KAISER - 7825 2,570 23 6,569 Asphalt Weak 4,938 Collector 34 60 20 67 7830 KALIN - 7830 2,578 23 6,589 Asphalt Moderate 1,094 Collector 84 12 1 81 7835 KALIN - 7835 2,634 22 6,439 Asphalt Moderate 4,802 Collector 31 54 27 61 7840 KALIN - 7840 2,111 24 6,083 Asphalt Moderate 5,141 Arterial 49 40 17 62 7845 KALIN - 7845 3,244 24 8,685 Asphalt Weak 3,032 Arterial 71 22 9 80 7850 KALIN - 7850 5,315 26 14,760 Asphalt Moderate 5,052 Arterial 49 42 17 73 7855 KALIN - 7855 5,271 24 13,764 Asphalt Moderate 2,927 Arterial 71 18 15 81 7860 KALIN - 7860 2,610 24 6,959 Asphalt Weak 6,208 Arterial 41 55 20 78 7865 KALIN - 7865 5,323 23 13,604 Asphalt Moderate 1,756 Arterial 82 7 11 86 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 27 of 57 8890 MARLIN - 8890 687 24 1,831 Asphalt Moderate 770 SC Residential 81 1 17 81 8895 MARLIN - 8895 1,329 25 3,693 Asphalt Strong 1,930 SC Residential 45 10 43 43 8900 MARLIN - 8900 1,402 24 3,748 Asphalt Moderate 934 SC Residential 77 4 15 70 8905 MARLIN - 8905 4,807 25 12,830 Asphalt Moderate 955 SC Residential 76 3 16 68 8910 MARS - 8910 1,109 24 2,924 Asphalt Strong 2,348 SC Residential 33 30 37 35 8915 MARSEILLE - 8915 755 21 1,761 Asphalt Moderate 1,311 SC Residential 67 5 20 54 8920 MARSHALL - 8920 859 23 2,195 Asphalt Strong 2,760 SC Residential 21 42 37 25 8925 MARSHALL - 8925 858 23 2,394 Asphalt Strong 2,535 SC Residential 28 20 51 28 8930 MARTHA - 8930 1,183 20 2,737 Asphalt Strong 1,582 SC Residential 55 5 32 41 8935 MARTIN - 8935 1,322 23 3,379 Asphalt Weak 5,029 Collector 33 65 16 66 8940 MARTIN - 8940 5,246 24 14,060 Asphalt Moderate 1,488 Collector 79 2 20 83 8945 MARY - 8945 359 24 958 Asphalt Strong 2,565 SC Residential 27 2 76 38 8950 MAUI - 8950 1,070 24 2,853 Asphalt Moderate 1,334 SC Residential 67 10 16 54 8955 MAYO - 8955 1,251 27 3,633 Asphalt Strong 1,510 SC Residential 57 8 25 40 8960 MC CABE COVE - 8960 1,283 31 4,418 Asphalt Strong 3,701 Residential 54 2 44 57 8965 MC CABE - 8965 2,621 23 6,698 Asphalt Moderate 3,699 Collector 47 35 26 67 8970 MC CABE - 8970 5,296 24 13,828 Asphalt Moderate 1,024 Collector 85 7 2 77 8975 MC CABE - 8975 5,270 24 14,053 Asphalt Moderate 2,711 Arterial 73 8 23 82 8980 MC CABE - 8980 2,635 33 9,660 Asphalt Moderate 3,518 Arterial 65 10 26 69 8985 MC CABE - 8985 5,307 24 14,151 Asphalt Weak 5,669 Collector 24 71 18 55 8990 MC CABE - 8990 2,695 26 7,787 Asphalt Moderate 2,942 Collector 58 21 30 79 8995 MC CABE - 8995 1,285 36 5,138 Asphalt Moderate 4,485 Residential 47 38 22 66 9000 MC CABE - 9000 2,591 23 6,620 Asphalt Moderate 3,066 Residential 64 17 22 72 9005 MC CABE - 9005 5,310 23 13,394 Asphalt Moderate 3,583 Residential 58 14 30 65 9010 MC CABE - 9010 5,543 24 14,782 Asphalt Moderate 3,916 Collector 44 31 33 64 9015 MC CABE - 9015 5,170 24 13,787 Asphalt Moderate 924 Collector 87 6 1 75 9020 MC CABE - 9020 5,280 24 14,080 Asphalt Moderate 312 Collector 96 0 0 89 9025 MC CABE - 9025 4,240 24 11,306 Asphalt Moderate 417 Collector 94 5 0 95 9030 MC CABE - 9030 1,420 24 3,785 Asphalt Moderate 644 Collector 91 0 0 75 9035 MC CABE - 9035 5,211 24 13,895 Asphalt Moderate 2,597 Collector 63 14 30 78 9040 MC CABE - 9040 5,320 24 14,185 Asphalt Moderate 1,376 Collector 80 3 21 91 9045 MC CABE - 9045 5,257 24 14,020 Asphalt Moderate 792 Collector 89 5 3 83 9050 MC CABE - 9050 5,255 24 14,013 Asphalt Weak 3,222 Collector 57 40 12 81 9055 MC CABE - 9055 4,104 24 10,943 Asphalt Moderate 2,154 Collector 69 9 22 73 9060 MC CABE - 9060 2,477 24 6,604 Asphalt Moderate 673 Collector 90 6 0 86 9065 MC CABE - 9065 2,651 21 6,185 Asphalt Moderate 222 Collector 97 0 1 95 9070 MC CONNELL - 9070 5,430 24 14,480 Asphalt Weak 3,819 Collector 49 67 2 88 9075 MC CONNELL - 9075 5,299 24 14,129 Asphalt Weak 3,488 Collector 53 57 0 79 9080 MC CONNELL - 9080 1,117 22 2,729 Asphalt Moderate 719 Arterial 93 0 1 84 9085 MC CONNELL - 9085 5,361 24 14,296 Asphalt Moderate 4,905 Collector 30 40 42 58 9090 MC CONNELL - 9090 5,209 24 13,892 Asphalt Moderate 4,233 Collector 40 57 17 70 9095 MC CONNELL - 9095 2,923 25 8,118 Asphalt Weak 5,368 Collector 28 72 16 64 9100 MC DONALD - 9100 5,282 23 13,204 Asphalt Weak 4,993 Collector 33 63 20 71 9105 MC DONALD - 9105 2,621 23 6,697 Asphalt Moderate 3,786 Collector 46 32 32 69 9110 MC DONALD - 9110 5,298 24 14,128 Asphalt Moderate 2,209 Collector 68 15 18 73 9115 MC DONALD - 9115 5,255 24 13,722 Asphalt Strong 3,923 Collector 40 32 38 64 9120 MC DONALD - 9120 2,653 24 7,074 Asphalt Moderate 5,354 Collector 24 69 21 54 9125 MC KINLEY - 9125 551 22 1,347 Asphalt Strong 1,536 SC Residential 56 9 34 57 9130 MCCONNELL - 9130 5,309 24 13,858 Asphalt Moderate 5,366 Collector 23 65 25 52 9135 MCCONNELL - 9135 4,124 24 10,997 Asphalt Moderate 5,207 Collector 26 57 31 57 9140 MCCONNELL - 9140 3,782 24 10,084 Asphalt Strong 4,428 Collector 32 29 51 58 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 32 of 57 10680 PICACHO - 10680 3,963 22 9,687 Asphalt Strong 5,042 Arterial 47 22 42 73 10685 PICACHO - 10685 3,602 22 8,804 Asphalt Moderate 6,353 Arterial 36 33 40 60 10690 PIERCE - 10690 881 25 2,446 Asphalt Moderate 2,319 SC Residential 42 36 14 29 10695 PIERCE - 10695 2,162 25 6,004 Asphalt Strong 2,278 SC Residential 35 15 45 28 10700 PIERRE - 10700 823 25 2,285 Asphalt Strong 1,838 SC Residential 47 9 44 51 10705 PINE - 10705 1,841 25 5,115 Asphalt Strong 2,268 SC Residential 35 15 56 52 10710 PINE - 10710 617 25 1,713 Asphalt Strong 1,673 SC Residential 52 17 23 39 10715 PIONEER - 10715 2,619 24 6,983 Asphalt Strong 2,225 SC Residential 36 18 56 60 10720 PISMO - 10720 421 25 1,168 Asphalt Moderate 3,335 SC Residential 17 59 30 30 10725 PITZER - 10725 5,179 24 13,810 Asphalt Moderate 4,291 Collector 39 45 25 60 10730 PITZER - 10730 2,678 24 6,860 Asphalt Weak 5,635 Residential 37 56 13 55 10735 PITZER - 10735 5,465 24 14,574 Asphalt Moderate 1,031 Collector 85 12 2 86 10740 PLAZA - 10740 1,750 24 4,666 Asphalt Strong 1,786 SC Residential 49 9 44 56 10745 PLUTO - 10745 1,024 25 2,845 Asphalt Strong 2,013 SC Residential 42 17 38 40 10750 POE - 10750 5,280 24 14,080 Asphalt Strong 4,205 Collector 35 42 33 59 10755 POE - 10755 3,614 24 9,637 Asphalt Moderate 2,917 Collector 58 22 12 47 10760 POLARIS - 10760 1,894 24 5,051 Asphalt Strong 2,365 SC Residential 32 24 52 53 10765 POLK - 10765 570 25 1,583 Asphalt Moderate 1,640 SC Residential 59 17 14 44 10770 POLK - 10770 1,557 25 4,325 Asphalt Strong 1,272 SC Residential 64 2 26 50 10775 POMONA - 10775 1,619 24 4,318 Asphalt Moderate 1,862 SC Residential 53 20 25 53 10780 PORTOLA - 10780 592 25 1,644 Asphalt Strong 1,824 SC Residential 48 18 29 39 10785 PORTSMOUTH - 10785 1,912 24 5,415 Asphalt Moderate 1,969 SC Residential 51 17 24 37 10790 POTRERO - 10790 829 23 2,118 Asphalt Strong 1,813 SC Residential 48 2 39 30 10795 POWELL - 10795 445 23 1,138 Asphalt Moderate 4,637 Residential 45 30 16 32 10800 PRADO - 10800 715 34 2,700 Asphalt Moderate 3,063 SC Residential 23 49 33 36 10805 PRADO - 10805 920 31 2,863 Asphalt Moderate 1,679 SC Residential 58 19 14 44 10810 PRADO - 10810 307 24 817 Asphalt Strong 1,083 SC Residential 69 0 0 9 10815 PRECIADO - 10815 942 26 2,720 Asphalt Moderate 3,874 Residential 54 19 25 55 10820 PRIM - 10820 2,531 29 8,155 Asphalt Weak 4,893 Collector 35 62 18 68 10825 PRINCETON - 10825 1,007 30 3,355 Asphalt Strong 2,327 SC Residential 34 27 36 29 10830 PULUAM - 10830 5,487 24 14,633 Asphalt Weak 4,756 Collector 37 61 20 76 10835 PULUAM - 10835 5,547 24 14,792 Asphalt Weak 4,102 Collector 45 46 17 66 10840 QUECHAN - 10840 4,877 20 12,679 Asphalt Moderate 4,034 Arterial 60 16 21 56 10845 QUEMADO - 10845 932 24 2,485 Asphalt Strong 1,252 SC Residential 64 0 28 50 10850 QUEMADO - 10850 1,259 20 2,798 Asphalt Moderate 2,419 SC Residential 40 32 24 34 10855 QUEMADO - 10855 4,059 24 10,207 Asphalt Strong 2,417 SC Residential 31 25 49 43 10860 QUEMADO - 10860 317 24 846 Asphalt Strong 1,932 SC Residential 45 23 32 48 10865 QUICK - 10865 2,594 20 5,765 Asphalt Weak 2,907 Collector 61 33 1 54 10870 QUINCY - 10870 2,833 23 7,333 Asphalt Moderate 1,776 SC Residential 56 20 18 46 10875 RAILROAD - 10875 987 26 2,664 Asphalt Strong 5,833 Residential 27 34 40 33 10880 RAINBOW - 10880 330 27 990 Asphalt Moderate 829 SC Residential 79 0 14 67 10885 RAINBOW - 10885 1,913 39 7,055 Asphalt Strong 1,513 SC Residential 57 13 22 43 10890 RALPH - 10890 406 34 1,533 Asphalt Moderate 2,247 SC Residential 44 26 25 37 10895 RALPH - 10895 2,709 35 10,535 Asphalt Weak 4,480 Collector 40 53 11 54 10900 RALPH - 10900 5,280 24 14,080 Asphalt Weak 2,593 Collector 65 45 1 91 10905 RALPH - 10905 2,595 24 6,919 Asphalt Weak 4,210 Collector 44 71 3 83 10910 RALPH - 10910 5,279 24 14,078 Asphalt Moderate 831 Collector 88 9 1 86 10915 RALPH - 10915 2,825 23 7,220 Asphalt Moderate 422 Collector 94 0 0 85 10920 RAMBLER - 10920 323 24 862 Asphalt Moderate 2,606 SC Residential 35 49 13 31 10925 RAMON - 10925 809 29 2,606 Asphalt Strong 1,551 SC Residential 56 13 25 46 10930 RAMONA - 10930 377 23 962 Asphalt Strong 2,345 SC Residential 33 24 47 43 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 39 of 57 10935 RAMP FROM HARTHORN TO HOLT - 10935 1,443 25 4,009 Asphalt Moderate 3,642 Collector 48 25 33 65 10940 RAMP WALKER TO GENTRY - 10940 298 25 828 Asphalt Moderate 3,675 Collector 48 33 22 56 10945 RAMP WINTERHAVEN TO US 80 - 10945 128 28 399 Asphalt Moderate 4,059 Collector 42 37 7 18 10950 RANCHERO - 10950 614 22 1,502 Asphalt Moderate 1,133 SC Residential 72 13 8 59 10955 RANCHERO - 10955 799 19 1,687 Asphalt Strong 2,136 SC Residential 39 19 32 23 10960 RANCHERO - 10960 461 26 1,333 Asphalt Strong 1,774 SC Residential 49 12 39 52 10965 RED SEA - 10965 2,263 24 6,033 Asphalt Strong 2,293 SC Residential 34 18 54 51 10970 RED SEA - 10970 1,282 26 3,702 Asphalt Strong 2,011 SC Residential 43 12 54 63 10975 RED SEA - 10975 1,953 24 5,105 Asphalt Strong 2,362 SC Residential 33 31 41 47 10980 RED SEA - 10980 488 23 1,248 Asphalt Moderate 1,424 SC Residential 64 14 15 54 10985 REDONDO - 10985 2,062 29 6,041 Asphalt Moderate 1,737 SC Residential 57 14 23 46 10990 REDONDO - 10990 645 25 1,790 Asphalt Strong 2,087 SC Residential 40 26 36 49 10995 REDWOOD - 10995 909 23 2,345 Asphalt Strong 1,737 SC Residential 50 11 38 52 11000 REVIERA - 11000 277 61 1,876 Asphalt Moderate 3,515 SC Residential 12 59 32 22 11005 RILEY - 11005 2,636 22 6,442 Asphalt Moderate 1,076 Residential 87 0 7 77 11010 RILEY - 11010 2,651 21 6,185 Asphalt Weak 6,554 Residential 27 81 7 61 11015 RIO VISTA - 11015 2,033 33 7,226 Asphalt Strong 5,197 Residential 35 29 36 39 11020 RIO VISTA - 11020 2,041 33 5,898 Asphalt Strong 6,372 Residential 20 36 49 33 11025 RIVIERA - 11025 3,148 47 15,952 Asphalt Strong 3,121 SC Residential 11 54 40 23 11030 RIVIERA - 11030 2,777 49 15,234 Asphalt Moderate 3,337 SC Residential 17 54 32 24 11035 RIVIERA - 11035 1,758 58 10,066 Asphalt Strong 2,051 SC Residential 41 25 26 28 11040 RIVIERA - 11040 2,199 54 10,979 Asphalt Strong 2,698 SC Residential 23 39 43 34 11045 RIVIERA - 11045 617 38 2,604 Asphalt Strong 2,035 SC Residential 42 15 52 62 11050 RIVIERA - 11050 1,516 41 6,546 Asphalt Moderate 3,447 SC Residential 14 68 24 28 11055 RIVIERA - 11055 2,749 51 15,115 Asphalt Moderate 2,471 SC Residential 38 31 24 28 11060 RIVIERA - 11060 1,260 46 6,254 Asphalt Moderate 1,787 SC Residential 55 20 22 53 11065 RIVIERA - 11065 1,515 50 8,476 Asphalt Moderate 2,558 SC Residential 36 40 23 39 11070 RIVIERA - 11070 385 25 1,069 Asphalt Strong 1,526 SC Residential 56 0 37 46 11075 ROAD 2MO1A - 11075 5,280 24 14,080 Asphalt Moderate 4,553 Arterial 54 23 26 66 11080 ROAD 2MO1A - 11080 5,280 24 14,080 Asphalt Moderate 5,988 Arterial 40 46 26 69 11085 ROAD 2MO1A - 11085 3,453 24 9,209 Asphalt Moderate 5,787 Arterial 42 48 21 69 11090 ROAD - 11090 2,770 21 6,464 Asphalt Moderate 2,907 Collector 58 12 31 65 11095 ROBIN - 11095 819 38 3,457 Asphalt Moderate 4,919 Residential 42 43 6 27 11100 ROCKING HORSE - 11100 831 35 3,230 Asphalt Moderate 3,044 Residential 64 14 14 50 11105 ROCKWOOD - 11105 2,572 18 5,311 Asphalt Moderate 6,528 Residential 23 58 27 42 11110 RODEO - 11110 1,035 27 3,176 Asphalt Strong 2,746 SC Residential 22 43 42 37 11115 RODEO - 11115 3,596 23 9,427 Asphalt Strong 1,803 SC Residential 48 20 35 59 11120 RONA - 11120 123 24 327 Asphalt Strong 2,358 SC Residential 33 0 64 28 11125 ROOD - 11125 2,226 45 12,192 Asphalt Moderate 1,546 Residential 82 3 8 70 11130 ROOD - 11130 1,472 71 10,798 Asphalt Moderate 2,731 Residential 68 23 7 67 11135 ROOD - 11135 479 48 2,553 Asphalt Moderate 1,375 Residential 84 2 7 71 11140 ROOSEVELT - 11140 1,668 29 4,986 Asphalt Strong 2,246 SC Residential 36 23 38 31 11145 ROSELLE - 11145 949 23 2,425 Asphalt Strong 1,354 SC Residential 61 1 39 66 11150 ROSITAS - 11150 910 23 2,325 Asphalt Strong 1,809 SC Residential 48 18 36 57 11155 ROSS - 11155 5,902 24 15,739 Asphalt Moderate 2,679 Arterial 73 6 22 78 11160 ROSS - 11160 5,319 24 14,183 Asphalt Moderate 1,768 Arterial 82 0 19 88 11165 ROSS - 11165 2,611 30 8,704 Asphalt Moderate 2,657 Arterial 73 1 28 79 11170 ROSS - 11170 5,283 25 14,381 Asphalt Moderate 5,182 Arterial 48 24 41 81 11175 ROSS - 11175 2,649 24 7,064 Asphalt Moderate 5,174 Arterial 48 30 33 76 11180 ROSS - 11180 5,261 24 14,028 Asphalt Moderate 847 Arterial 92 1 8 95 11185 ROSS - 11185 2,633 31 9,068 Asphalt Moderate 522 Arterial 95 1 3 95 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 40 of 57 14510 VENICE - 14510 312 22 763 Asphalt Strong 2,828 SC Residential 19 48 32 19 14515 VENICE - 14515 989 25 2,746 Asphalt Moderate 1,122 SC Residential 72 5 16 60 14520 VENICE - 14520 545 24 1,421 Asphalt Strong 2,056 SC Residential 41 22 33 38 14525 VENUS - 14525 1,117 25 2,965 Asphalt Strong 1,896 SC Residential 46 15 36 42 14530 VERDE - 14530 599 25 1,663 Asphalt Moderate 1,344 Collector 81 0 12 69 14535 VERDE - 14535 4,730 24 12,614 Asphalt Strong 3,813 Collector 41 28 39 60 14540 VERDE SCHOOL - 14540 276 22 673 Asphalt Moderate 1,127 Collector 84 9 0 71 14545 VERDE SCHOOL - 14545 5,269 24 14,050 Asphalt Moderate 5,021 Collector 28 59 24 54 14550 VERDE SCHOOL - 14550 5,401 24 14,404 Asphalt Moderate 1,769 Collector 75 1 24 77 14555 VERDE SCHOOL - 14555 5,253 24 14,009 Asphalt Moderate 1,641 Collector 77 4 23 86 14560 VERDE SCHOOL - 14560 5,549 23 14,186 Asphalt Moderate 2,992 Collector 57 19 23 59 14565 VERIANO - 14565 329 24 877 Asphalt Strong 1,741 SC Residential 50 12 32 41 14570 VERONICA - 14570 2,709 30 9,030 Asphalt Strong 2,714 SC Residential 22 26 56 35 14575 VILLA - 14575 98 27 294 Asphalt Moderate 3,622 Collector 48 32 8 28 14580 VILLA - 14580 1,344 23 3,435 Asphalt Strong 3,232 Residential 60 0 39 59 14585 VILLA - 14585 2,639 25 7,290 Asphalt Weak 5,659 Collector 25 64 20 44 14590 VILLA - 14590 2,650 24 7,067 Asphalt Moderate 4,436 Collector 37 57 16 60 14595 VILLA - 14595 2,695 28 8,292 Asphalt Moderate 641 Collector 91 0 0 75 14600 VISTA - 14600 2,349 24 6,266 Asphalt Strong 2,219 SC Residential 37 8 65 60 14605 VISTA VERDE - 14605 948 36 3,659 Asphalt Moderate 2,251 Residential 74 0 19 61 14610 CARTER - 14610 2,566 22 6,407 Asphalt Moderate 3,020 Collector 57 9 35 62 14615 STEVENS - 14615 875 24 2,333 Asphalt Strong 5,314 Residential 34 32 30 28 14620 STEVENS - 14620 973 23 2,487 Asphalt Strong 5,856 Residential 27 35 35 24 14625 STEVENS - 14625 849 25 2,359 Asphalt Strong 5,741 Residential 28 26 42 23 14630 STEVENS - 14630 1,841 26 5,319 Asphalt Strong 4,771 Residential 40 25 33 40 14635 W. GRAHAM - 14635 5,662 24 15,100 Asphalt Moderate 5,139 Collector 27 51 34 53 14640 WAHD - 14640 2,613 23 6,676 Asphalt Moderate 4,345 Collector 38 48 30 73 14645 WAHL - 14645 2,640 24 7,040 Asphalt Moderate 3,281 Collector 53 20 30 63 14650 WAHL - 14650 2,331 24 6,217 Asphalt Moderate 5,916 Collector 15 58 39 43 14655 WAHL - 14655 2,403 23 6,140 Asphalt Moderate 5,305 Collector 24 53 31 43 14660 WAHL - 14660 2,758 23 7,047 Asphalt Moderate 4,945 Collector 29 53 31 59 14665 WAHL - 14665 5,311 24 14,162 Asphalt Moderate 4,801 Collector 31 58 27 68 14670 WAILUKU - 14670 880 27 2,641 Asphalt Strong 1,801 SC Residential 49 0 56 61 14675 WALKER - 14675 5,128 25 14,243 Asphalt Moderate 1,894 Collector 73 6 24 80 14680 WALKER - 14680 2,832 24 7,552 Asphalt Moderate 2,245 Collector 68 10 23 73 14685 WALKER - 14685 350 24 934 Asphalt Moderate 1,544 Collector 78 0 15 66 14690 WALKER - 14690 418 24 1,115 Asphalt Moderate 2,285 Collector 67 14 14 60 14695 WALKER - 14695 1,675 20 3,722 Asphalt Moderate 894 Collector 87 5 0 73 14700 WALKER - 14700 832 23 2,127 Asphalt Moderate 4,448 Collector 36 57 2 30 14705 WALKER - 14705 5,192 26 14,413 Asphalt Moderate 2,638 Collector 62 15 30 82 14710 WALKER - 14710 5,071 24 13,523 Asphalt Moderate 5,131 Collector 27 61 31 68 14715 WALKER - 14715 5,272 24 14,058 Asphalt Moderate 418 Collector 94 3 0 91 14720 WARE - 14720 5,400 24 14,493 Asphalt Moderate 4,317 Collector 38 42 28 58 14725 WASHINGTON - 14725 1,680 26 5,222 Asphalt Moderate 1,764 SC Residential 56 21 13 40 14730 WEBB - 14730 5,276 24 14,069 Asphalt Weak 5,593 Collector 25 70 19 59 14735 WEBB - 14735 5,272 24 14,059 Asphalt Weak 5,321 Collector 29 66 21 65 14740 WEBSTER - 14740 5,246 24 13,988 Asphalt Moderate 1,474 Collector 79 2 19 81 14745 WEED - 14745 5,386 24 14,362 Asphalt Moderate 5,024 Collector 28 53 31 56 14750 WESTMORELAND - 14750 2,647 23 6,765 Asphalt Moderate 3,348 Collector 52 18 34 64 14755 FORRESTER - 14755 3,305 23 8,446 Asphalt Moderate 2,455 Arterial 75 16 8 77 14760 FORRESTER - 14760 4,572 24 12,192 Asphalt Moderate 5,931 Arterial 41 46 27 73 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 54 of 57 15020 WIRT - 15020 5,291 24 14,109 Asphalt Moderate 4,349 Collector 38 31 44 68 15025 WIRT - 15025 5,268 24 14,048 Asphalt Moderate 4,784 Collector 32 64 20 67 15030 WIRT - 15030 2,671 21 6,232 Asphalt Moderate 3,657 Collector 48 37 22 66 15035 WIXOM - 15035 4,727 25 11,707 Asphalt Weak 5,404 Collector 28 68 15 53 15040 WIXOM - 15040 2,708 22 6,619 Asphalt Moderate 5,156 Collector 26 65 21 54 15045 WORTHINGTON - 15045 5,280 24 14,080 Asphalt Moderate 2,897 Arterial 71 19 16 86 15050 WORTHINGTON - 15050 4,059 24 10,824 Asphalt Moderate 2,454 Arterial 75 10 18 83 15055 WORTHINGTON - 15055 5,396 24 14,135 Asphalt Moderate 6,059 Arterial 39 28 38 54 15060 WORTHINGTON - 15060 5,327 24 14,206 Asphalt Moderate 6,421 Arterial 36 44 31 64 15065 WORTHINGTON - 15065 5,240 24 13,973 Asphalt Moderate 6,559 Arterial 34 43 34 62 15070 WORTHINGTON - 15070 5,261 24 14,028 Asphalt Moderate 6,808 Arterial 32 52 27 58 15075 WORTHINGTON - 15075 5,294 24 14,116 Asphalt Moderate 4,447 Arterial 56 23 31 81 15080 WORTHINGTON - 15080 2,712 26 7,835 Asphalt Strong 4,286 Arterial 55 13 38 71 15085 WORTHINGTON - 15085 363 23 926 Asphalt Weak 6,954 Arterial 34 60 12 52 15090 WORTHINGTON - 15090 4,622 45 19,764 Asphalt Moderate 3,555 Arterial 64 21 16 71 15095 WORTHINGTON - 15095 5,247 24 13,991 Asphalt Strong 5,684 Arterial 40 20 49 62 15100 WORTHINGTON - 15100 2,669 23 6,820 Asphalt Strong 6,794 Arterial 28 24 59 54 15105 WORTHINGTON - 15105 5,259 25 14,609 Asphalt Strong 3,006 Arterial 68 1 35 81 15110 WORTHINGTON - 15110 3,338 23 8,943 Asphalt Strong 3,595 Arterial 62 2 36 66 15115 WORTHINGTON - 15115 5,280 24 14,080 Asphalt Moderate 1,710 Arterial 83 4 11 81 15120 WORTHINGTON - 15120 4,654 24 12,411 Asphalt Moderate 3,448 Arterial 66 9 26 70 15125 WORTHINGTON - 15125 5,572 24 14,857 Asphalt Strong 4,925 Arterial 48 2 62 77 15130 WORTHINGTON - 15130 5,145 24 13,720 Asphalt Strong 5,158 Arterial 46 31 37 77 15135 WORTHINGTON - 15135 5,186 24 13,830 Asphalt Moderate 3,747 Arterial 63 16 23 71 15140 WORTHINGTON - 15140 1,335 24 3,559 Asphalt Strong 4,190 Arterial 56 7 34 53 15145 WORTHINGTON - 15145 3,995 24 10,652 Asphalt Moderate 1,819 Arterial 82 2 17 86 15150 WORTHINGTON - 15150 5,303 24 14,141 Asphalt Moderate 2,113 Arterial 79 1 20 81 15155 WORTHINGTON - 15155 2,618 22 6,400 Asphalt Moderate 2,632 Arterial 74 5 20 74 15160 WRIGHT - 15160 198 28 615 Asphalt Strong 2,136 SC Residential 39 23 32 31 15165 YACHT CLUB - 15165 1,697 68 12,928 Asphalt Strong 2,131 SC Residential 39 25 39 48 15170 YELLOW SEA - 15170 926 25 2,573 Asphalt Moderate 1,791 SC Residential 55 16 30 60 15175 YOCUM - 15175 3,943 23 10,075 Asphalt Weak 2,523 Collector 66 40 2 87 15180 YOCUM - 15180 2,684 24 7,325 Asphalt Weak 4,351 Collector 42 48 18 63 15185 YORBA - 15185 316 25 878 Asphalt Strong 1,811 SC Residential 48 13 35 45 15190 YORK - 15190 5,313 24 13,727 Asphalt Moderate 2,177 Arterial 78 10 15 86 15195 YOUNG - 15195 724 29 2,333 Asphalt Strong 1,881 SC Residential 46 2 42 31 15200 YOURMAN - 15200 5,380 24 14,558 Asphalt Moderate 4,512 Collector 36 53 28 72 15205 YOURMAN - 15205 2,911 26 8,409 Asphalt Strong 3,725 Collector 43 8 55 57 15210 YOURMAN - 15210 4,179 20 9,432 Asphalt Strong 3,213 Collector 51 13 40 62 15215 YOURMAN - 15215 3,997 24 10,658 Asphalt Moderate 2,746 Collector 61 11 30 69 15220 YOURMAN - 15220 5,381 24 14,348 Asphalt Moderate 1,144 Collector 84 0 9 71 15225 YOURMAN - 15225 1,215 24 3,241 Asphalt Moderate 1,881 Collector 73 14 6 61 15230 YOURMAN - 15230 1,362 20 3,026 Asphalt Strong 3,221 Residential 60 0 32 45 15235 YUMA - 15235 846 28 2,687 Asphalt Strong 2,283 SC Residential 35 9 50 26 15240 ZENOS - 15240 5,280 24 14,080 Asphalt Moderate 2,650 Collector 62 17 29 81 15245 ZENOS - 15245 2,282 24 6,086 Asphalt Moderate 3,571 Collector 49 35 27 75 15250 ZENOS - 15250 5,321 30 17,230 Asphalt Moderate 3,712 Collector 47 28 27 55 15255 ZINETTA - 15255 1,230 46 6,287 Asphalt Moderate 1,202 Residential 86 3 3 73 15260 ZUMA - 15260 475 24 1,265 Asphalt Strong 1,597 SC Residential 54 15 27 50 15265 COUNTY ROAD 9A01,COOLIDGESPRIN - 15265 4,369 16 7,767 Concrete Moderate 48 SC Residential 19 67 18 42 15270 COUNTY ROAD 9A01,COOLIDGESPRIN - 15270 5,281 16 9,388 Concrete Moderate 53 SC Residential 12 59 36 43 IMS Infrastructure Management Services ImpCo Analysis Results Rev3 - SuperSegs, Supers by ID page 56 of 57 Appendix B – Imperial Center Specific Plan Volume One of Two Prepared for the County of Imperial Prepared by Development Design & Engineering, Inc. For Suilo Investment Corporation May 2, 2006 Imperial Center Specific Plan Credits, Acknowledgments, Contributors, and Participants County of Imperial Board of Supervisors • Victor M. Carrillo • Hank Kuiper • Joe Maruca • Gary Wyatt • Wally Leimgruber Planning Commissioners • Rudy Schaffner, Chariman • Carson Kalin, Vice-Chairman • Fenrando Torres • Robert Herrera • Russell Roben • Dave Gaddis • Norm Niver • Josie Godinez • Bill Cole • Sergio Cabanas County of Imperial Planning Staff • Jurg Heuberger, Director of Planning • Darrell Gardner, Assistant Planning Director • Richard Cabanilla, Planner IV • Jim Minnick, Planner IV City of Calexico Ricardo Hinojosa, Director of Planning Imperial Center Specific Plan Heber Utility District John Jordan, General Manager Contributors (cid:137) Development Design & Engineering, Inc. 1122 State Street, Ste. D El Centro, California 92243, phone: (760) 353 - 8110 Tom DuBose – President Ken Cluskey – Project Manager Daniel Arvizo – Associate Planner Architect - Eric Chen, JWDA, 529 East Valley Boulevard, (cid:137) San Gabriel, CA 91776, phone: 626-288-9199 Traffic Engineering – Dahl, Robins & Associates, Inc., 1560 South (cid:137) 5th Avenue, Yuma, AZ 85364, phone: 928-819-0825 Focused Burrowing Owl Survey – UltraSystems Environmental, (cid:137) 100 Pacifica, Suite 250, Irvine, CA 92618 phone: 949-788-4901 Imperial Center Specific Plan Table of Contents Chapter 1 - SUMMARY 1-1 PROJECT DESCRIPTION 1-2 PROJECT SUMMARY 1-3 The Project Components 1-4 Development Potential 1-5 Design Concept 1-7 Graphic Package 1-8 DEVELOPMENT AND CONSERVATION ISSUES 1-9 Chapter 2 - INTRODUCTION 2-1 DECISION TO PREPARE A SPECIFIC PLAN 2-1 CONSULTANT PREPARATION 2-1 PLANNING PROCESS 2-1 PUBLIC PARTICIPATION 2-2 SPECIFIC PLAN PURPOSES 2-3 PROJECT LOCATION 2-3 Chapter 3 - AUTHORITY AND SCOPE 3-1 AUTHORITY 3-1 STATUTORY REQUIREMENTS 3-2 IMPERIAL COUNTY GENERAL PLAN REQUIREMENTS 3-2 Imperial Center Specific Plan HEBER SPECIFIC AREA PLAN 3-6 APPLICABILITY 3-8 CHAPTER 4 GOALS & OBJECTIVES 4-1 PROJE CT GOALS & OBJECIVES 4-1 GATEWAY TO THE AMERICAS 4-4 IMPERIAL COUNTY CIRCULATION AND SCENIC HIGHWAYS 4-6 ELEMENT Safe Convenient & Efficient Transportation System 4-6 IMPERIAL COUNTY LAND USE ELEMENT 4-7 Economic Growth 4-8 Chapter 5 - LAND USE PLAN 5-1 GENERAL PLAN AND ZONING 5-2 Heber Specific Plan Area 5-2 CONCEPTUAL SITE PLAN 5-4 LAND USES 5-4 DEVELOPMENT STANDARDS 5-12 Adjacent Land Use Compatibility 5-17 Chapter 6 - DESIGN STANDARDS 6-1 DESIGN CONCEPT 6-1 BUILDINGS 6-4 Building Mass 6-5 Imperial Center Specific Plan Building Materials 6-6 COLORS 6-7 SIGNS 6-7 MAINTENANCE 6-13 IMPERIAL CENTER ARCHITECTURAL GUILDELINES 6-14 LIGHTING 6-16 Chapter 7 - LANDSCAPE GUIDELINES 7-1 GENERAL DESIGN CRITERIA 7-1 Medians (Center Islands) 7-5 Detentions Basin Design 7-5 PARCEL/LOT LANDSCAPE DESIGN CRITERIA 7-6 LANDSCAPE PLANT MATERIAL LIST 7-10 MAINTENANCE 7-14 Landscape Guidelines 7-15 Chapter 8 - INFRASTRUCTURE PLAN 8-1 TRAFFIC CIRCULATION 8-1 PUBLIC SERVICES 8-5 Sewer & Water 8-5 RECLAIMED WATER IMPERIAL CENTER 8-11 WATER ASSESSMENT AVAILIBILITY 8-15 STORM DRAIN 8-17 Imperial Center Specific Plan Proposed Drainage System 8-17 Storm Water Retention 8-18 EXISTING PUBLIC SERVICES 8-18 EXISTING PUBLIC UTILITIES 8-19 SCHOOLS 8-20 Chapter 9 - PHASING 9-1 Objective 9-2 Phase A 9-3 Phases B - D 9-3 Chapter 10 - IMPLEMENTATION MEASURES 10-1 ADMINISTRATION AND ENFORCEMENT 10-1 INFRASTRUCTURE FINANCING 10-9 Chapter 11 - ENVIRONMENTAL ISSUES 11-1 GEOLOGY 11-1 SOILS 11-1 CONVERSION OF AGRICULTURE LAND TO URBAN 11-2 Right to Farm Ordinance 11-3 Land Use Incompatibility 11-3 Employment Creating Land Uses 11-4 Imperial Center Specific Plan CIRCULATION 11-5 MITIGATION 11-5 BIOLOGICAL RESOURCES 11-8 Burrowing Owl Survey 11-8 Survey Results 11-9 DISCUSSION 11-10 CEQA AND SPECIFIC PLANS 11-12 CEQA Alternatives 11-12 Tiering 11-12 List of Tables Table 5-1 Project Land Use Compatibility 5-3 Table 5-2 Proposed Land Use Summary 5-6 Table 5-3 Permitted Uses 5-7 Table 5-4 Conditional Use Permit Only 5-9 Table 5-5 Temporary Use Permit Only 5-10 Table 5-6 Parking Requirements 5-14 Table 8-1 Water Use Factors 8-9 Table 8-2 Engineers Estimate for Potable Water Demand 8-14 Table 8-3 IID’s Annual Water Supply Reliability Demand 8-16 Table 8-4 Summary of Existing Facilities 8-21 Table 8-5 Proposed Right-of-Way 8-22 Imperial Center Specific Plan Table 9-1 Phasing Plan 9-2 Table 10-1 Preliminary Engineer’s Cost 10-10 Estimate for Off-Site Improvements List of Figures Figure 1-A Imperial Center Project Site 1-2 Figure 1-B Architectural Rending of Space Walk 1-4 Figure 1-C Water Feature Prototype for Imperial Center 1-7 Figure 1-D Architectural Rendering of Star Court and Cinema 1-9 Figure 2-A Model Specific Plan Process 2-2 Figure 2-B Regional Location Map 2-4 Figure 2-C Local Project Location Map 2-5 Figure 4-A Imperial Center Food Court 4-1 Figure 5-A Land Use Plan 5-1 Figure 5-B Water Element Concept 5-4 Figure 5-C Conceptual Land Use Plan 5-5 Figure 6-A Analysis Diagram 6-1 Figure 6-B Sun Court Auction Area/Factory Outlet 6-2 Figure 6-C The Travel Center 6-3 Figure 6-D Factory Outlet Design 6-5 Figure 6-E Pylon Sign 6-8 Figure 6-F Entrance Sign 6-9 Figure 6-G Prototype Store Blade Sign 6-10 Imperial Center Specific Plan Figure 6-H Prototype Fuel Service Sign 6-12 Figure 6-I Prototype Directory Sign 6-13 Figure 6-J Major Signage Location 6-15 Figure 6-K Prototype Mounted Wall/Street Light 6-16 Figure 7-A Proposed Street Landscaping 7-4 Figure 7-B Tree Row Concept 7-10 Figure 7-C Landscape Master Plan 7-16 Figure 8-A SR-111 looking southbound proximate to 8-1 The Imperial Center Specific Plan Site Figure 8-B Sewer & Water System Plan-Alternative One 8-23 Figure 8-C Sewer & Water System Plan-Alternative Two 8-24 Figure 8-D Sewer & Water System Plan-Alternative Three 8-25 Figure 9-A Phasing Plan 9-1 Appendices – Volume 2 Appendix A Legal Description Appendix B Traffic Study Prepared by: Dahl, Robins & Associates, Inc. January 2002 Appendix C Addendum to Traffic Study Prepared by: Linscott Law & Greenspan Engineers, Revised March 21, 2006 Appendix D Preliminary Infrastructure Study Appendix E Burrowing Owl Study Prepared by: Ultra Systems, October 19, 2005 Appendix F Preliminary Drainage Study Imperial Center Specific Plan Appendix G Storm Water Pollution Plan Appendix H Heber Public Utility District Service Area Plan Appendix I Water Supply Assessment and Verification Report Imperial Center Specific Plan Copy of Adopting Resolution and/or Ordinance 1. SUMMARY This Imperial Center Specific Plan has been prepared to establish policy and development guidelines for a regional commercial center that will be designed for specialty, retail and wholesale commercial businesses. The Imperial Center will be located on approximately 77.64 acres of farmland located within unincorporated area of the County of Imperial. The project area is considered to be in an ideal location due to its proximity to Federal and State highways. In addition, the project commercial area is just 4.5 miles north of the United States/Mexico international border, including the new Gateway to the Americas business park. This Specific Plan is organized into two volumes. Volume One contains eleven chapters written to systematically implement the County of Imperial’s General Plan1 as it relates to the project area. The eleven chapters for Volume One include the following: • Chapter 1 – SUMMARY • Chapter 2 – INTRODUCTION • Chapter 3 – AUTHORITY AND SCOPE • Chapter 4 – GOALS AND OBJECTIVES • Chapter 5 – LAND USE PLAN • Chapter 6 – DESIGN STANDARDS • Chapter 7 – LANDSCAPE GUIDELINES • Chapter 8 – INFRASTRUCTURE PLAN • Chapter 9 – PHASING • Chapter 10 – IMPLEMENTATION MEASURES • Chapter 11 – ENVIRONMENTAL ISSUES Volume Two contains the summaries of key specific plan background data, information and all appendices that are referenced in Volume One. The following documents have been prepared and are included in Volume Two of the Imperial Center Specific Plan: 1 Version: November 2002 Update Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-1 • Appendix A – Legal Description • Appendix B – Traffic Study • Appendix C – Addendum to Traffic Study • Appendix D – Department of Transportation Letter • Appendix E – Preliminary Infrastructure Study • Appendix F – Burrowing Owl Study • Appendix G – Preliminary Drainage Study • Appendix H – Storm Water Management For Construction Activities • Appendix I – Storm Water Pollution Plan • Appendix J -- Heber Public Utility District Service Area Plan • Appendix K – Water Supply Assessment and Verification Report Figure 1-A Imperial Center Project Site PROJECT DESCRIPTION The anticipated land uses at the Imperial Center will provide a variety of commercial uses that are intended to serve the needs of regional shoppers and the wholesale market. The Imperial Center will consist of general commercial uses that are typical to retail shopping centers. Specific uses allowed within the project site are listed in Chapter 5, Land Use. The Imperial Center is expected to provide approximately Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-2 900,000 square feet of commercial facilities. The following summarizes the primary potential uses of the project area: • Information/Exhibit/Auction Center 15,000 square feet • A wholesale outlet 460,000 square feet • Food court 13,000 square feet • Multiplex cinema 83,000 square feet • Hotel (200 rooms) 135,000 square feet • Plaza/Auction Court 95,000 square feet • Hotel Plaza/Restaurant 5,000-10,000 square feet • Convenience Market with a Filling Station 37,000 square feet • Eleven pads each for 5,000 square feet of retail space The highest and best uses identified above are driving the project. However, due to the changing economics and the expected long life of the project area, the listed land uses are subject to change. Chapter 5 of this Specific Plan lists all permitted land uses that could also be found in the project area. PROJECT SUMMARY Imperial Center will be located near Heber, an unincorporated area in the county of Imperial, California, and 4.5 miles from the border between the United States and Mexico. It will be a branded wholesale outlet / auction center (the “Outlet Center”), and convenience store/gas station, along with a number of other retail concerns, within a commercial complex. The Outlet Center, convenience market, parking and Outdoor Areas will be constructed on a 77.64 – acre parcel. The Imperial Center is planned to include an Outlet Center and/ retail and wholesale merchandising opportunities. Outlet Centers or mall is a type of shopping mall, in which manufacturers sell their products directly to the public through their own branded stores. Other stores in outlet malls are operated by retailers selling returned goods and discontinued products, often at heavily reduced prices. Clothing, sporting goods, Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-3 electrical products, cosmetics, and toys are among the types of items sold at outlet malls. Wholesale merchandising opportunities include a wholesaler that buys and stores goods in large quantities from their manufacturers or importers, and then sells smaller quantities to retailers, who in turn sell to the general public. Retailers may also buy directly from manufacturers. The Imperial Center may also contain traditional retail merchandisers. These merchandisers are involved with functions and activities involved in the selling of goods and commodities directly to consumers. The Project Components A number of different enterprises will be constructed, to serve diverse commercial appetites. The following is a preliminary list of projects expected to be included, with an approximation of space needed, in square-feet: Figure 1-B Architectural Rendering of Space Walk Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-4 1. Outlet Center • An Information Center / Exhibit center / Auction Center (15,000 s.f.) • A Wholesale Outlet / Show Rooms (460,000 s.f.) • A Food Court (13,000 s.f.) • A Multiplex cinema complex, with sixteen (16) screens (83,000 s.f.) • A Two Hundred-Room Hotel, with provisions for retail shops & a restaurant (135,000 s.f.) • Central Plaza / Auction Court (95,000 s.f.) • Cinema Plaza / Retail Court (44,000 s.f.) • Hotel Plaza Restaurant / View Court (5,000-10,000 s.f.) • Loading areas (expansive docks with 50 truck loading spaces and 70 automobile loading spaces) • Convenience Store with Gas Station (37,000 s.f.) 2. Other Components • Eleven (11) Free-Standing Pads (Five to Nine Thousand (5,000-9,000) s.f. each) • General Automobile Parking (2,500 spaces) Development Potential The demand for Imperial Center currently exists, is substantial, and is projected to dramatically increase, both near-term and in the long-term future. This demand is a function of a number of things, including: 1. The lack of substantive competition in Imperial County for an Outlet Store. With regards to the wholesale outlet and auction court, no “factory outlet” exists in the area. 2. The Center’s strategic location at the southeast junction of State Route 111 (“SR 111”) and Heber Road. SR 111 is a major arterial road / highway linking Coachella Valley and the Border at Calexico / Mexicali. Imperial County reports that currently thousands of automotive vehicles per day use SR 111. (The County’s reported truck figures is an estimate based upon a mechanical axle count, local business activity and border crossing reported by U.S. customs). Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-5 3. There is a large cluster of retail establishments’ development within a five mile radius of the project site. A “retail cluster” is a group of same or similar retail establishments that locate in close vicinity of each other. Retail establishments cluster together as a strategy to attract more shoppers to an area that can offer a variety of products to consumers. The Imperial Center will be located just a few miles North on Hwy 111 of the recently opened Super Wal-Mart. It is the first Wal-Mart “Superstore” in Imperial Valley. The Imperial Valley Mall has also opened within close vicinity to the proposed Imperial Center site. Several other large retail establishments are expected to locate within a close vicinity of the Imperial Valley Mall in an effort to increase the size of the retail cluster. The Imperial Center will be located between the two large retail centers mentioned above creating a large regional retail cluster of retail. It is expected that this clustering of retail establishments within close vicinity will greatly benefit the Imperial Center. 4. The robust automotive, pedestrian and truck traffic through the Calexico Port of Entry (“Calexico POE”), which has been the main border crossing area in the Imperial County between the United States and Mexico for decades, and the Calexico East Federal Port of Entry (“Calexico East POE”), which opened in December 1996. Calexico East POE was constructed to ease congestion (i.e., heavy truck traffic) at the Calexico POE; northbound truck traffic that formerly used the Calexico POE now must use Calexico East POE. According to U.S. Office of Immigration Statistics, 188,614 non-immigrants passed through the two Calexico ports in fiscal year 20022 - the most recent year for which this information is available. 5. The Gateway of the Americas Project (“Gateway”), a 1,775 gross-acre / 1,421 net-acre multi-use industrial, warehouse and distribution land development project, through which commercial / retail lots will be available for sale, or built- to-suit. Gateway is contiguous to Calexico East POE and is strategically positioned to take full advantage of the new wave of border business opportunities on the United States 2 U.S. Office of Immigration Statistics; Table 609, Fiscal Year 2002: http://uscis.gov/graphics/shared/statistics/yearbook/s002/fy2002table609.xls. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-6 side arising from the North America Free Trade Agreement (“NAFTA”). 6. The continuing effects of NAFTA on trade and commerce between the United States and Mexico. The Border region in the Imperial-Mexicali Valleys is particularly well positioned to capitalize on economic and business growth attendant to NAFTA and increased industrial and manufacturing development in Mexico; this should result in a significant increase in truck traffic at Calexico East POE. 7. The special requirements of the Border area relating to lack or inadequacy of communications, services, parts and fuel in Mexico, and the stringent requirements of the U.S. government relating to trucks entering the United States from Mexico. Design Concept The Imperial Center project is designed as independent but interwoven cluster of buildings, plazas and functions. The heart of the development is the “Outlet Center”. The general layout is fashioned after an out door mall for the display, shopping area while a functional and efficient network of loading area is provided at the perimeter of the mall behind the warehouse area. Figure 1 – C The multiple commercial uses planned for the Imperial Center are proposed to share a water feature and unified design Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-7 The “Outlet Center” is anchored by a major hotel complex to facilitate the international clienteles as well as local travelers at the South end, and an entertainment complex composed of a 16-screen cinema, and arcades at the North end. At the center of the wholesale outlet mall is the information center, show area connected by a meandering pedestrian traffic spine with shopping façade along it. Each wholesale store will have a front shopping / display area facing the pedestrian walkway, with a warehouse facility in the back facing the loading zone. The overall design is an interpretation on a Southern California / Latin American flavors. There are many plazas /courtyards; geometric design patterns and heavy saturated color schemes. The design theme is taken from the sunny naturalistic aspect of its environment. Everything is bright and colorful, and the motifs are taken from elements such as sun, water, river, and stars. The combined experience is that of a cheerful, festivity shopping experience. Finally there are 11 free standing pads for any future developments that will add diversity and enhance the total experience of the Imperial Center. These pads may include retail, restaurants or other uses listed in Chapter 5. There are also total of 2,500 parking spaces to ensure convenient parking to the center. Graphic Package The graphic and signage package incorporate the essence of Latin America and contemporary California themes. The floor designs are patterned after the natural environment of Southern California and organized into Water Court (at Hotel Complex), Sun Court (Information Center / Auction Center / Food Court); Star Court (Entertainment Complex), River Walk and Space Walk (Wholesale Outlet). Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-8 Figure 1 - D Architectural Rendering of the proposed Star Court and Cinema DEVELOPMENT AND CONSERVATION ISSUES The Imperial Center Specific Plan identifies development and conservation issues that will be addressed throughout this Plan. The following issues have been identified: 1. Compatibility with surrounding land uses due to proposed buffering next to agricultural activities, a. Buffering will include a minimum 200 feet buffer zone to mitigate any potential significant impact upon agricultural land both along both the eastern and northerly borders of the project site. This buffer zone will be measured from the edge of a building within the project site to the edge of the agriculture zone. The agriculture zone is the area which contains agriculture operations. Drains, canals, parking lots and Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-9 roads are not considered to be the start of an agriculture zone. b. Install a 6 foot solid block wall along the easterly property line. The truck loading area located directly adjacent to the agriculture property to the east of the project site will act as a sufficient buffer to the property. c. More information regarding surrounding land use compatibility issues can be found in Chapter 11. 2. Providing safe and efficient traffic circulation and site access, including: a. Safe and adequate access for both private and emergency vehicles while complementing the regional circulation; and b. Providing adequate facilities for the delivery of all public services to the proposed development within the project, 3. Providing a unique commercial neighborhood with a compatible mixture of commercial facilities: 4. a. Providing Public Services for: i. Sewer; ii. Drinking Water; iii. Electricity; and iv. Storm Water Retention. b. Phasing; c. Architectural variety and enhanced landscaping opportunities; d. Maintaining design criteria and compliance with policies and Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-10 Regulations. The above noted issues are addressed through objectives, policies, and programs identified later in this plan. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 1-11 2. INTRODUCTION DECISION TO PREPARE A SPECIFIC PLAN Government Code §65450 provides that Imperial County has the authority to facilitate the preparation of a specific plan. Private parties may also initiate a plan as provided for by Imperial County. In the case of this Imperial Center Specific Plan the plan initiation by Development, Design and Engineering, Inc. on behalf of Suilo Investment Corporation. The proposal includes an application for a tentative subdivision map, which requires the concurrent preparation of a specific plan. IMPERIAL COUNTY PLANNING & DEVELOPMENT SERVICES DEPARTMENT Imperial County has the discretion to decide who may prepare a specific plan. Specific plans may be a requirement of a project and prepared by a project proponent or by a consultant under contract to the project proponent. In this situation Development, Design & Engineering, Inc. is responsible for the preparation of this specific plan as part of a project application for Suilo Investment Corporation, the landowner. The Imperial County Planning & Development Services Department has reviewed the Specific Area Plan for consistency with the County’s General Plan and other regulations. PLANNING PROCESS The following model is a modified version of the strategic planning process described in the General Plan Guidelines, and adapted to the intricacies of specific plans. This model is conceptual and may be used as a reference to guide the selection or development of a process, which meets the needs of the respective jurisdiction. Other comprehensive planning models are available which may achieve similar results. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 2-1 Figure 2-A Model Specific Plan Process PUBLIC PARTICIPATION The participation of those working or residing within a specific plan area or more broad participation of the local citizens can play an important role in the preparation of a specific plan. Section 65453 states that "A specific plan shall be prepared, adopted and amended in the same manner as a general plan..." as such, opportunities for the involvement of citizens, public agencies, public utilities, civic education, and other community groups must be provided pursuant to §65351. The County of Imperial notifies surrounding property owners of the Specific Plan public hearings scheduled for the Planning Commission and Board of Supervisors meetings. Further, other agencies, school Imperial Center Specific Plan May 2, 2006 (cid:132) Page 2-2 districts, and other stakeholders are contacted during this specific plan process. SPECIFIC PLAN PURPOSES The purpose of this Specific Plan is to provide a comprehensive development program for the Imperial Center Commercial Outlet Center. The Imperial Center Specific Plan is a development and policy document that is designed to be in conformance with the County of Imperial General Plan. Principally, this Specific Plan is structured to show how the project will develop, under what regulatory system(s), with what amenities and minimum services, and over what period of time or phases. It will also show how the project mitigates impacts and how it is compatible with the surrounding land uses. Lastly this Specific Plan shows how the project is consistent with the Heber Public Utility District’s Service Area Plan and the Heber Urban Area General Plan designation adopted by Imperial County. PROJECT LOCATION The project area for the Imperial Center is located in an unincorporated area of County of Imperial east of San Diego County, south of Riverside County, west of the Arizona State boundary, and immediately north of the International Boundary with the Republic of Mexico (See Figure 2-B). The project area is approximately 2.5 miles south of Interstate 8 and directly east of Yourman Road and State Highway 111, (See Figure 2-C). The project area lies immediately northeast of State Highways 111 and 86. The project area is bordered by Abatti Road to the north and to Heber Road to the south. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 2-3 Figure 2-B Regional Location Map Development Design & Engineering Inc. has worked with Suilo Inc. to develop the Imperial Center Specific Plan. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 2-4 86 (cid:71) 8 111 Site Heber Road 86 Figure 2 – C Local Location Map Imperial Center Specific Plan May 2, 2006 (cid:132) Page 2-5 3. AUTHORITY AND SCOPE AUTHORITY The State of California Government Code authorizes cities and counties to adopt Specific Plans1. Upon its adoption by the City of Imperial Board of Supervisors, the Imperial Center Specific Plan will serve as a tool to the County’s General Plan and will provide policy guidelines for the 77.64- acre project site. The Imperial Center Specific Plan is policy and regulatory by design. The project not only will identify objectives and policies to meet its goals, the Plan will include detailed development requirements that will set the scope of the development. Specific policy requirements such as the plans and objectives are discussed in Chapter 4. Examples of development regulations can be found in Chapter 5. Existing regulations and ordinances that are in conflict with the Specific Plan may be modified or amended to be compatible with The Specific Plan, unless plan specific equivalent regulations are imposed within the plan. This is discussed further in Chapter 12. This Specific Plan is limited to the 77.64-acre project area identified in Section I of this document, which is located within the “Heber Specific Plan Area.” In accordance with the goals and objectives of the General Plan, Land Use Element, the Imperial Center Specific Plan would reduce overall available acreage for future development in the Heber Specific Plan Area by 1.6%, from 4770 acres to 4692.36 acres. The State, the County’s General Plan and the Heber Service Area Plan are the authorities that regulate the Imperial Center Specific Plan. The following will detail County, and local requirements. 1 State of California Government Code Section 65450 through 65457 Imperial Center Specific Plan May 2, 2006 (cid:132) Page 3-1 STATUTORY REQUIREMENTS Section 65451 of the Government Code mandates that a specific plan contain: A specific plan shall include a text and a diagram or diagrams, which specify all of the following in detail: a. The distribution, location, and extent of the uses of land, including open space, within the area covered by the plan. b. The proposed distribution, location, and extent and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, energy, and other essential facilities proposed to be located within the area covered by the plan and needed to support the land uses described in the plan. c. Standards and criteria by which development will proceed, and standards for the conservation, development, and utilization of natural resources, where applicable. d. A program of implementation measures including regulations, programs, public works projects, and financing measures necessary to carry out paragraphs (1), (2), and (3). e. The specific plan shall include a statement of the relationship of the specific plan to the general plan. This Specific Plan is also designed with the guidelines outlined by the Governor’s Office of Planning and Research “The Planner’s Guide to Specific Plans”. This model outline recommends guidelines when designing a Specific Plan (See Appendix A). IMPERIAL COUNTY GENERAL PLAN REQUIREMENTS Specific Plans may be adopted by Resolution of the County Board of Supervisors. In accordance with the Imperial County’s General Plan Specific Plan requirements, the Imperial Center Specific Plan May 2, 2006 (cid:132) Page 3-2 Imperial Center Specific Plan shall clearly demonstrate economic, social, public facility, or other local public benefit. The County of Imperial General Plan states that the following Standards and Criteria shall be evaluated for each proposed Specific Plan during a "Specific Plan Pre- Application Assessment" with recommended findings presented to the Board of Supervisors by the Planning & Development Services Department and Planning Commission. In order to adopt a Specific Plan, the Board of Supervisors shall consider the findings of the following five criteria: 1. Will the Specific Plan have a positive fiscal impact for the County of Imperial? Response: Yes, the project is expected to have a positive fiscal impact to the County. As identified in the Imperial Center Summary of Information (Appendix B), the center “would be a real boost for the local economy”. As with any commercial facility, the Imperial Center is expected to provide employment and tax revenue. The project is expected to prosper and succeed due to the following events: • Automotive and truck traffic going to and coming from the Border; • Border crossing business from Mexico; • The Gateway of the Americas Project – a 1,570 acre multi use industrial, distribution and warehousing project; • The Center’s strategic location along State Route Highway 111; • The continuing effects of the North America Free Trade Agreement (NAFTA); and • Expected growth of population in the region. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 3-3 2. Will the Specific Plan create new and permanent jobs? An acceptable project will be able to demonstrate through an independent market analysis that jobs to be created by the project will not be achieved to the detriment of existing jobs or businesses within the County. In other words, there will be a net increase in countywide employment. Response: Yes, the project will create new and permanent jobs for the various proposed commercial services. A Fiscal Impact analysis shall be undertaken as part of this project application to identify new jobs and revenue sources. 3. Will the Specific Plan minimize or mitigate adverse environmental impacts and be compatible with existing or planned land uses of nearby cities or communities? Response: Yes, the project is expected to mitigate all potential impacts identified in the environmental analysis. These include improved infrastructure projects and land use compatibility measures that will be implemented during and after development. 4. Will the Specific Plan offer diverse or unique opportunities to the County and its citizens? An acceptable project will be able to demonstrate benefits of the project, which are not generally or adequately available in the County. Examples include, but are not limited to, increased cultural activities, convention or conference facilities, or unique recreational opportunities. Response: Yes, unlike your standard retail services, the Center is expected to provide a varied and unique shopping experience that includes outlet center retail and wholesale goods. Outlet Center and wholesale goods may include clothing, furniture, sporting goods and many other types of goods. The Center is also expected to provide diverse and compatible highway commercial uses. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 3-4 5. Will the Specific Plan result in the achievement or significant progress toward accomplishing an unmet goal of the County General Plan? Response: The Imperial Center will provide various methods that will either meet or exceed goals of the General Plan, primarily the Economic Growth, Goal 2 that states: Diversify employment and economic opportunities in the County while preserving agricultural activity. Objective 2.1 Achieve a balanced and diversified local economy with a variety of economic and employment opportunities. Objective 2.2 Provide adequate space and land use classifications to meet current and projected economic needs for commercial development. Objective 2.3 Continue to evaluate economic development strategies, including new industrial, commercial, and tourist-oriented land uses. Tourist-oriented uses must be compatible with BLM management goals in areas near BLM lands. The Project also meets specific objectives that are listed in various components of the General Plan, including: Objective 1.1 Maintain and improve the existing road and highway network, while providing for future expansion and improvement based on travel demand and the development of alternative travel modes. Objective 1.3 The efficient regulation of land uses that economizes on water consumption, enhances equivalent dwelling unit demand for domestic water resources, and that makes Imperial Center Specific Plan May 2, 2006 (cid:132) Page 3-5 available affordable resources for continued urban growth and development. Objective 4.2 The provision of safe and efficient community wastewater treatment facilities which adequately service the present and future needs of residential, commercial, and industrial development within the Imperial Irrigation District service area. Overall, the Imperial Center is expected to provide a significant social and economic benefit to the County by providing a vital economic and employment center. HEBER SPECIFIC PLAN AREA The project area is located within a marginal section of the Heber Specific Plan Area, and is therefore subject to the requirements that are identified in the Imperial County’s General plan. The following objectives are taken from the County’s General Plan, Heber Specific Plan requirements. Each objective and policy is followed by a response that indicates conformity to the General Plan: Objectives a. The Heber Specific Plan Area is intended to allow commercial, residential, and industrial and other employment oriented development in a mixed-use orientation. Response: The Imperial Center Specific Plan will create a commercial employment oriented development. b. The Specific Plan will be coordinated with both the City of El Centro, Calexico and any other affected agencies. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 3-6 Response: Copies of draft and final plans will be sent to the City of El Centro, the City of Calexico, Heber Utility District, Caltrans, and the County of Imperial. c. Public services will be provided concurrent with need. Response: Wastewater and water services are addressed in the Heber Public Utility District Area Plan. Policies i. The Specific Plan shall allow for a wide range of development opportunities, which can conform in a mixed-use setting. Response: The Imperial Center Specific Plan provides a diverse commercial area that will “open the door” for a compliment of mixed uses along the State Route Highway 111. ii. The Specific Plan shall include architectural and landscape design guidelines, which assure sensitivity to the regional corridor of Highway 111. Response: Chapter 8 and 9 provide architectural and landscape guidelines. iii. The Specific Plan shall include public facilities financing plan outlining capital improvement needed for the project, feasible financing mechanisms, and timing for their construction. This Imperial Center Specific Plan May 2, 2006 (cid:132) Page 3-7 includes sewer, water, and fire and police protection. Response: Chapter 10 details the implementation measures that will be required to finance the required infrastructure. IV. The Specific Plan shall be accompanied by an Environmental Impact Report which includes the analysis of project impacts to include the following: Agriculture, air and water quality, biology, cultural resources, growth inducement, traffic, visual/aesthetics, and such other issues as required by the County of Imperial and other Responsible Agencies. Response: The project area is only a nominal area of the over all Heber Specific Plan area. Mitigation measures will reduce the project impacts to less than significant. All mitigation measures have been included herein. The Imperial Center Specific Plan is shown to be consistent with the Heber Specific Plan Area because it meets or exceeds the specified Goals, Objectives and Policies within the plan. APPLICABILITY The Imperial Center Specific Plan is a planning tool document of the Imperial County General Plan. The project will require General Plan consistency and approval from the Board of Supervisors. The project is effective upon the date of adoption as stated in the adopted resolution approving the Imperial Center Specific Plan. The Specific Plan is valid until such time that the Plan is amended or rescinded by the County Board of Supervisors. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 3-8 4. GOALS & OBJECTIVES PROJECT GOALS & OBJECTIVES This Specific Plan provides a set of development standards that apply to the 77.64-acre project area. These standards are designed to conform to the County’s General Plan. These standards are also intended to meet the requirements from local, regional, and state agencies. The following specific goals are results of the developer’s desire to create a project that can be successfully completed while responding to the concerns of a variety of adjacent communities and various agencies. Figure 4-A Artist’s Image of Proposed Imperial Center Food Court 1. Commercial Development Goal “To provide a well-designed, high quality commercial development that will provide for a variation of space and shop areas for both the wholesale/retail market.” Imperial Center Specific Plan May 2, 2006 (cid:132) Page 4-1 Objective 1 Design facilities that are attractive to surrounding communities and interstate and state highway vehicular commerce. Objective 2 Design the project with a mixture of several different store sizes in order for a variety of different business owners to be able to display and sale their product. Objective 3 Allow sufficient permitted land uses in the plan to respond to changes in the marketplace over a 10-year build out period. Objective 4 Group the smaller shops within the project so that similar user needs are grouped together. Objective 5 Maximize the larger shops marketing similar types of products so the business owner can make his/her selection and return to his/her shop. 2. Circulation Goal Design an internal pedestrian circulation system that will provide a safe and enjoyable outdoor experience with easy access to the shops and services within the complex. Provide for parking facilities that are easily remembered, cooled by a tree canopy, and a short walk to the shops. Objective Provide both primary and secondary points of access to accommodate emergency vehicle access, and efficient traffic flow. This is accomplished by realigning Yourman Road. Yourman Road will be designed to bi-sect the development and provide convenient access to shops and services. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 4-2 3. Public Services Provide a safe, functional and sewage, drinking water, and storm drain facilities that are reasonable to install, operate, and maintain. Objective 1 Extend sewage collection lines and water distribution lines from existing treatment facilities to make efficient use of existing treatment capacities and reduce per site unit operation and maintenance costs. Phase C will be activated upon development of 10% of the site. Objective 2 Provide the opportunity for a needed sewer and water infrastructure for existing adjacent development not adequately served by existing infrastructure. Objective 3 Construct a secured storm water retention basin to retain a majority of the storm water runoff generated by the maximum theoretical design storm. 4. Parks and Recreation Goal Provide numerous opportunities to enjoy outdoor passive recreational experiences. Objective Design open space outdoor areas that take into consideration the seasonal weather. 5. Noise The Imperial Center shall be designed to minimize indoor and outdoor noise environments. Objective 1 Provide alternatives to project proponents and project reviewers. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 4-3 Objective 2 Where possible, provide noise barriers to reduce noise impacts to adjacent land uses and to on-site projects as they are proposed. GATEWAY TO THE AMERICAS GOALS & OBJECTIVES In addition to the goals and objectives prepared specifically for this Imperial Center Specific Plan, the objectives adopted as part of the Imperial County Gateway to the Americas Specific Plan are incorporated by reference as part of this Specific Plan document. In all cases, these objectives are compatible with the vision established by this Imperial Center Specific Plan document. This project is consistent with key goals and objectives of the Gateway of the Americas Specific Plan as follows: Specific relationships between the General Plan and this document are identified and discussed in Section VI, General Plan and Environmental Analysis. The consideration of the General Plan goals, the project’s unique physical setting, and its compelling economic potential relevant to the planning area, the County, and the property owners, have resulted in the formation of the following objectives: 1. A development strategy that creates new employment opportunities within Imperial County, consistent with market opportunities. 2. A land use plan that provides for a variety of industrial and commercial uses supportive to the International Port of Entry. 3. An implementation strategy that provides some flexibility in responding to market conditions with respect to authorized land uses, yet ensures compatibility with the other objectives of the Specific Planning Area (SPA) while Imperial Center Specific Plan May 2, 2006 (cid:132) Page 4-4 promoting an economically efficient use of the land. 4. A project financing plan that provides the potential for a property owner/County partnership of private and public investment in the project, allowing it to respond to market opportunities as well as, provide employment opportunities and tax base. 5. Legal mechanisms (i.e.: development agreements, etc.) that provide certainty in the allowable land uses and define the project’s obligation to provide public facilities, services, and utilities on a phase-by-phase basis as required to accommodate the incremental needs of the project. 6. Development guidelines that provide design criteria appropriate for the various types of land uses located throughout the SPA. 7. Policies, in conjunction with the SPA’s EIR, setting forth the conditions and requirements for development of the project’s phases designed to mitigate the environmental effects caused by the SPA development. Objective 1 A development strategy that creates new employment opportunities within Imperial County, consistent with market opportunities. Response: The Imperial Center Specific Plan proposal shall include an economic impact analysis. It is anticipated that the Imperial Center shall lead to the creation of significant new primary permanent jobs. These new positions will be principally in retail, entertainment, and warehousing and trade-related activities. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 4-5 It is also anticipated that the Imperial Center could stimulate housing market demand and associated retail sales benefiting nearby cities. Finally, a substantial volume of “non-permanent” construction employment will occur. The construction of new commercial shall generate additional jobs. IMPERIAL COUNTY CIRCULATION AND SCENIC HIGHWAYS ELEMENT GOALS AND OBJECTIVES Preface The following presents a set of goals and objectives of the Circulation and Scenic Highways Element along with policies to achieve these specific goals and objectives. They have been prepared in collaboration with the General Plan Ad-Hoc Advisory Committee appointed by the Board of Supervisors. The Goals and Objectives, together with the Implementation Programs and Policies in Chapter IV, are the statements that shall provide direction for private development as well as government actions and programs. Imperial County's Goals and Objectives are intended to serve as long-term principles and policy statements representing ideals, which have been determined by the citizens as being desirable and deserving of community time and resources to achieve. These Goals and Objectives, therefore, are important guidelines for land use decision-making. It is recognized, however, that other social, economic, environmental, and legal considerations are involved in land use decisions and that these Goals and Objectives, and those of the other General Plan Elements, should be used as guidelines but not doctrines. Goals and Objectives Safe, Convenient, and Efficient Transportation System Goal 1: The County will provide an integrated transportation system for the safe and efficient movement of people and Imperial Center Specific Plan May 2, 2006 (cid:132) Page 4-6 goods within and through the County of Imperial with minimum disruption to the environment. Response: The existing road and highway network will be maintained and improved. A traffic analysis has been prepared which includes significant mitigation measures. The project encourages the balance of employment, services, and housing throughout the County to preclude future traffic congestion. IMPERIAL COUNTY LAND USE ELEMENT GOALS AND OBJECTIVES Preface The Land Use Element of the General Plan serves as the primary policy statement by the Board of Supervisors for implementing development policies and land uses in Imperial County. This section of the Land Use Element presents Imperial County's Goals and Objectives relative to all land use within the unincorporated areas of the County. They have been prepared in collaboration with the General Plan Ad-Hoc Advisory Committee appointed by the Board of Supervisors. The Goals and Objectives, together with the Implementation Programs and Policies in Chapter IV, are the statements that shall provide direction for private development as well as government actions and programs. Imperial County's Goals and Objectives are intended to serve as long-term principles and policy statements representing ideals, which have been determined by the citizens as being desirable and deserving of community time and resources to achieve. These Goals and Objectives, therefore, are important guidelines for land use decision-making. It is recognized, however, that other social, economic, environmental, and legal considerations are involved in land use decisions and that these Goals and Imperial Center Specific Plan May 2, 2006 (cid:132) Page 4-7 Objectives, and those of the other General Plan Elements, should be used as guidelines but not doctrines. Goals Economic Growth Goal 2: Diversify employment and economic opportunities in the County while preserving agricultural activity. Response: This project achieves a balanced and diversified local economy with a variety of economic and employment opportunities. It provides adequate space and land use classifications to meet current and projected economic needs for commercial development. Further, this project includes commercial, and tourist- oriented land uses. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 4-8 5. LAND USE PLAN This section illustrates the proposed land development plan proposed for the Imperial Center Specific Plan. Figure 5-A Land Use Plan Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-1 This section of the Imperial Center Specific Plan will provide the proposed General Plan Designation, Zoning and Land Use for the Imperial Center. This plan includes specific land use policies and development requirements for the Specific Plan Area. This section will also provide an analysis of land use compatibility to surrounding activities. The following table summarizes the existing conditions of the project area mentioned earlier in this document, (Chapter 2). GENERAL PLAN AND ZONING The Imperial County General Plan identifies the project site as lying within the Heber Specific Plan Area. Following are the General Plan sections relating to this designation: Heber Specific Plan Area The Heber Specific Plan Area includes approximately 1,660 acres between the City of Calexico on the south, the railroad to the west, Corral Road to the north, and 1,320 feet east of Highway 111. The Heber Specific Plan Area is designed to allow for mixed-use development within the Heber Public Utility District due to its ability to offer urban level services. Objectives The Heber Specific Plan Area is intended to allow commercial, residential, industrial and other employment oriented development in a mixed use orientation. The Specific Plan will be coordinated with both the City of El Centro, Calexico and any other affected agencies. Public services will be provided concurrent with need. Policies The Specific Plan shall allow for a wide range of development opportunities, which can conform in a mixed-use setting. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-2 The Specific Plan shall include architectural and landscape design guidelines, which assure sensitivity to the regional corridor of Highway 111. The Specific Plan shall include public facilities financing plan outlining capital improvement needed for the project, feasible financing mechanisms, and timing for their construction. This includes sewer, water, and fire and police protection. Table 5-1 Project Land Use Compatibility Imperial Center Project Area Existing Proposed General Plan Designation SPA (Heber SPA (Imperial Specific Plan Center Specific Area) Plan Area) Zoning A2/SPA Imperial Center Commercial Zone (ICCZ) Land Use Agricultural Commercial As can be seen above, the proposed Imperial Center is consistent with the Heber Specific Plan objectives and policies regarding commercial development. Current Zoning The project site is currently zoned with an A2-SPA, combined zone district. SPA indicates that it is within an area designated as a Specific Plan Area, the Heber Specific Plan Area.1 The Imperial County Zoning Ordinance describes these zone districts as follows: § 90508.00 “A-2” ZONE (GENERAL AGRICULTURE) The purpose of the A-2 (General Agriculture), [40 Acre minimum] Zone is to designate areas that are suitable and intended primarily for agricultural uses (limited) and agricultural related compatible uses. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-3 CONCEPTUAL SITE PLAN The project plan is to subdivide the 77.64-acre agricultural parcel into thirteen commercial lots (See Figure 5-C). The subdivision breakdown is provided in Table 5-1. Figure 5 – B Water Element Concept Proposed for Imperial Center Figure 5–C identifies the mixed commercial recreation, retail service and lodging proposed upon the 77.64 acre Imperial Center site. It is noteworthy to point out that the proposed uses are intended to be complimentary. LAND USES 1. Permitted Land Uses The Imperial Center Specific Plan will allow primarily for development of general commercial land uses within the Imperial Center Commercial Zone. The General Plan describes General Commercial as: Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-4 Figure 5 – C Detailed Imperial Center Site Plan Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-5 General Commercial - Refers to commercial uses as described above <neighborhood commercial>, as well as larger retail outlets including regional centers, home improvement stores, business and construction support services, personal and business storage facilities, commercial recreation, health clubs and spas, medical, financial, and other professional offices and facilities, hotels and motels, automobile and equipment sales and services. Some of these uses may be restricted by location in certain zones, or by other limitations of implementing zoning. Agricultural and animal services may also be permitted subject to limitations of implementing zoning. This plan is designed to be compatible with the above described commercial definition in addition to being flexible enough to permit various compatible commercial uses that are listed in table 5-2 & 5-3. Table 5-2 Proposed Land Use Summary Lot Land Use Density Acreage 1 Gas Station/Convenient Store N/a 6.16 2 Commercial N/a 33.3 3 Commercial N/a 4.15 3A Interim Waste Water N/a 1.05 4 Hotel / Restaurant N/a 5.58 5 Commercial N/a 3.38 6 Commercial N/a 2.42 7 Commercial N/a 2.33 8 Commercial N/a 2.01 9 Commercial N/a 1.75 10 Commercial N/a 2.01 11 Commercial N/a 2.01 12 Commercial N/a 1.75 13 Commercial N/a 1.93 Streets N/A 7.81 Total Acres 77.64 Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-6 The primary land use in the Imperial Center Specific Plan is for commercial uses. The following table identifies the scope of commercial uses that are permitted within the Imperial Center Commercial Zone: Table 5-3 Imperial Center Permitted Uses Animal grooming and pet supplies (cid:137) Small Scale Indoor animal kennel or (cid:137) boarding facility Auditoriums (public) (cid:137) Auto rental (cid:137) Auto service or repair (cid:137) Auto tire sales/service (cid:137) Auto wash (cid:137) Automobile sales (new) (cid:137) Automobile sales (used) (cid:137) Bars, taverns, cocktail lounge (cid:137) Public/Private Bus depot (cid:137) Convenience market w/gas station (cid:137) Drive-in restaurant (cid:137) Retail drug and pharmaceutical (cid:137) Farmers Market (cid:137) Feed stores (rental and wholesale) (cid:137) Fire/police station (cid:137) Food store (cid:137) Gardening and landscape supply store (cid:137) Gift and card (cid:137) Health club/Gymnasium (cid:137) Hotel/Motel (cid:137) Hospital (cid:137) Ice vending (cid:137) Liquor store (cid:137) Miniature golf course (cid:137) Movie theater (cid:137) Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-7 Table 5-3 Imperial Center Permitted Uses Post office (cid:137) Public agency or utility (cid:137) Real estate office (cid:137) Regional Shopping Center (cid:137) Research and development office (cid:137) Residence incidental to primary use (i.e. (cid:137) caretakers residence, owners residence, security guards residence) Restaurants, cafe, coffee shop (cid:137) Skating rink (cid:137) Specialized stores/Outlet Center (cid:137) Travel agency (cid:137) Truck fuel without repairs (cid:137) Variety stores (cid:137) Veterinary clinic/hospital (cid:137) Utility substations (cid:137) Waste water treatment plants (cid:137) Water purification plants (cid:137) Water treatment plants (cid:137) The following uses, (Table 5-4) are recognized as appropriate and permitted in the Imperial Center Specific Plan Area in accordance with the standards and procedures contained in the Imperial County Land Use Ordinance. The uses listed in Table 5-4 are currently not proposed uses for the Specific Plan Area. It is the intent of this Specific Plan to conditionally allow for the uses in the case that changes in market conditions change leading to changes in the proposed uses. This Specific Plan is expected to be implemented throughout many years. Market conditions and economic demands frequently change over the time period in which the Specific Plan will be implemented. Therefore, the Specific Plan is designed to be able to react to those changes and implement the Specific Plan successfully. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-8 Table 5-4 Uses Permitted by Conditional Use Permit Only Circus or carnival (cid:137) Amusement park – Water Park (cid:137) College or university (cid:137) Communications/equipment buildings (cid:137) Large Outdoor animal kennel or boarding (cid:137) facility Court House (cid:137) Golf course (cid:137) Heliport (cid:137) Outdoor storage of RV’s, campers, truck (cid:137) trailers, and cargo containers Radio/television/Cellular or commercial (cid:137) communication facilities Recreational vehicle park (cid:137) Trade fair and exhibits (cid:137) 2. Temporary Uses: Table II.3.8-1 is a list of temporary uses and applicable restrictions. All temporary uses are subject to Administrative Review by the Director of Planning and Building. All Temporary uses shall be subject to the issuance of Temporary Use Permit by the Director of Planning and Building ( or conditional Use Permit as noted) and other necessary permits and licenses, including but not limited to building permits, sign permits and solicitor or vending licenses. In the issuance of such a permit, the Director of Planning and Building shall indicate the permitted hours of operation and any other conditions such as walls, fences or lighting, which are deemed necessary to reduce possible detrimental effects to surrounding developments and to protect the public health, safety and welfare. Prior to the issuance of a permit for a temporary use, a cash deposit may be required to be deposited by the County. The County shall use this cash deposit to defray the costs of property cleanup, in the event the permittee fails to do the same. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-9 Upon written application, the Director of Planning and Building may extend the time within which temporary uses may be operated, or may modify the limitations under which such uses may be conducted if the Director of Planning and Building determines that such extension or modification is in accord with the purposes of the regulations. Each site occupied by a temporary use shall be left free of debris, litter, or any other evidence of the temporary use upon completion of removal of the use, and shall thereafter be used only in accord with the provisions of the zoning regulations. The application for temporary use shall be accompanied by a fee established by the County’s Master Fee Schedule to cover the cost of processing the application prescribed in this section. The approving authority may waive this fee for charitable groups that do not need any public services. Table 5-5 Uses Permitted by Temporary Use Permit Only Agricultural and animal husbandry activity or project (cid:137) (4-H, FFA, or similar) conducted for educational purposed or school credit. A permit may be granted in any district when the Director of Planning and Building determines that such use will not cause a public nuisance relative to sanitation and health conditions. Agricultural products retail sales (fruit and vegetable (cid:137) stands) no more than twice per calendar week. A third day will be allowed in cases of official County of Imperial holidays. Circuses, rodeos, parades or similar outdoor (cid:137) entertainment or enterprises, subject to not more than five (5) days calendar days of operation in any calendar year. Requests exceeding these limitations will require the submittal and approval of a Conditional Use Permit. Christmas tree sales lots, Halloween pumpkin sales, (cid:137) and other holiday sales subject to not more than forty (40) calendar days of site occupation and operation in any calendar year. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-10 Table 5-5 Uses Permitted by Temporary Use Permit Only Contractors’ offices and storage yards on the site of an (cid:137) active construction site. Mobile home residences for security purposes on the (cid:137) site of an active construction project. Mobile trailer units properly designed for temporary (cid:137) classrooms, offices, banks, etc., for periods not to exceed ninety (90) days subject to Administrative Review. Requests for such uses of more than ninety days shall require approval of a Conditional use Permit by the Planning Commission. Such units shall meet all necessary requirements of building, fire and health codes. Outdoor art and craft shows and exhibits, subject to (cid:137) not more than three (3) calendar days of operation or exhibition in any sixty (60) day calendar period. Recycling drop-off bins sponsored by charitable (cid:137) institutions or schools for recycling of cans, newspapers or similar items, or for drop-off of clothes and small items. The bins shall be located, either behind buildings, or in the parking lots of businesses or other public or semi-public property on a temporary basis when written permission is granted by the property or business owner. When located in parking lots, the bins must be screened from view from the street. Said bins shall be kept in a neat and orderly manner. The bins may be left on the premises for a maximum of two days per calendar week. A third day will be allowed in cases of official County of Imperial holidays. Permission must be granted from the Imperial County Department of Planning and Development Services. Additional uses determined to be similar to the (cid:137) foregoing in the manner prescribed by these regulations. Septic Tank and Leech Field may be provided (cid:137) temporarily, as permitted by Imperial County Department of Health Services, until permanent utilities are able to be provided. More information regarding the septic tank and leech field is provided in Chapter 8, Infrastructure Plan. All agriculture (farming) uses in the A-2 Zone as listed (cid:137) under 90509.01 will be allowed temporarily until the Imperial Center can be fully built out. There will be a 200 foot buffer between agriculture and other land uses were appropriate Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-11 3. Prohibited Uses: Any use that is not listed in Table 5-2 and 5-3. DEVELOPMENT STANDARDS At build-out, the Imperial Center will provide a broad range of unique commercial uses, such as specialty, wholesale and retail. As envisioned, the Center will provide an architecturally inviting community atmosphere for both residents and visitors. The following are development standards to guide development of the Imperial Center: 1. Yards & Setbacks The following yard and setback requirements apply to all development within the Imperial Center. a. Front Yard- Outlet Mall: There is no requirement for setbacks for the outlet mall. The buildings may be placed in close vicinity to the property line in an effort to capture a sought after environment. For example, retail establishments within a “Mainstreet” environment are minimally setback from the sidewalk in order for patrons to enjoy the pedestrian atmosphere of window shopping. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-12 Any structure built on the property line shall provide a four hour fire wall to meet Fire Code requirements. In addition to the four hour fire wall, buildings that abut one another will have a five foot side yard setback. • Free Standing Retail: Free standing retail within the project, the pads along Hwy 111 for example, shall have a twenty (20) foot front yard setback. b. Side Yard – Outlet Mall: There is no side yard setback requirement for the buildings associated with a complex of buildings or a site plan that attempts to create a “Mainstreet” environment. • Free Standing Retail: Free standing retail within the project, the pads along Hwy 111 for example, shall have a ten (10) foot side yard setback. c. Rear Yard - Shall be a rear yard of not less than 20 feet, except that no rear yard shall be required in the event that a public alley exists and is adequate size to accommodate large commercial vehicles for the loading and unloading of products to the site. d. Minimum Lot Dimensions - Area: 20,000 SF Street Frontage: 50 feet Width: 75 feet Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-13 Depth: 75 feet e. Maximum Building Coverage 40 Percent 2. Height Buildings, and/or structures shall not exceed 60 (sixty) feet, whichever is less. 3. Minimum Distance Between Structures There is no minimum distance between structures within a single lot. 4. Parking The following table (5-5) provides guidelines for parking facilities at the Imperial Center. Table 5-6 Imperial Center Parking Requirements Use Parking Ratio 1. Outlet / Specialty Shops 1 space per 1,000 square feet of storage area, plus one space per 250 square feet. 2. Wholesale 1 space per 1,000 square Outlet/Specialized Stores feet of storage area, plus one space per 250 square feet. 3. Restaurants 1 space per 100 square feet 4. Fast food restaurants, 1 space per 75 square feet. cafes, coffee shops, bars, and taverns (except drive- thru) 5. Movie theatre or auditorium 1 space per two seats. 6. Hotel 1 space per room, plus 2 spaces for a manager’s unit, plus one space for every 1,000 square feet. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-14 Table 5-6 Imperial Center Parking Requirements Use Parking Ratio 7. Service station, auto repair 1 space per 300 square feet and tire sales 8. Barber and beauty shops 1 space per 100 square feet 9. Business facility, 1 space per 250 square feet professional offices and General Retail 10. Furniture Store 1 space per 500 square feet 11. Nursery 1 space per 250 square feet of indoor display and 1 space per 2000 square feet of outdoor sales area. 12. Automobile sales 1 space per 10,000 square feet of sales area plus 1 space per 250 square feet of office area. a. Parking Area Design All parking spaces shall be a minimum of nine feet (9’) in width and twenty feet (20’) in length. Handicapped automobile parking spaces shall comply with the requirements of Chapter 2-71, title 24, California Code of Regulations. b. Commercial Buses, Recreational Vehicle, and Semi-truck Parking: If necessary, Nine feet by forty feet spaces can be provided. c. Public Bus: A minimum two-bus length transit stop with appropriate facilities shall be provided. Covered seating and trash receptacles shall be provided per stop. c. Handicapped Parking Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-15 All handicapped parking spaces and access areas between handicapped parking spaces and primary entrances of associated buildings or facilities shall be surfaced in a manner to facilitate wheel chair use. e. Parking Area Standards Off-street parking areas will be designed to County Standards. f. Off-Street Loading Facilities 1.Buildings shall be designed with the loading areas primarily located to the side and rear of the building. 2.Loading areas shall be designed to provide for backing and maneuvering onsite and not from public streets. 3.Loading docks shall not encroach into building setbacks. 4.All loading areas fronting a public street shall be screened from view by any one or combination of the following: 5.All loading areas fronting a public street shall be screened from view by any one or combination of the following: i) Screen walls (similar in design and materials to main building) ii) Building/walls extensions iii) Ornamental landscaping adequate to serve intended Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-16 purpose. 5. Trash Enclosures All open outside storage of trash is prohibited in the “Imperial Center”. Trash containers must be shielded from view. If the area is outside, it must be screened by masonry wall not less than 6 feet in height, and have opaque gates. 6. Outdoor Storage Outdoor storage is permitted; however all storage areas viewed from a public street shall be screening shall consist of a wall similar in design and in material to the adjacent building and/or ornamental landscaping adequate to serve the intended purpose. Location of outdoor storage areas must be shown on the development site plan. Adjacent Land Use Compatibility The Imperial Center Specific Plan should be compatible with existing and planned land uses surrounding the site. All access will be provided from abutting roadways. The current surrounding land uses include Agricultural and transportation facilities to the north, west, east and south of the project area (County of Imperial). Adjacent land uses and their compatibility are described below. 1. Agriculture Typically, new development placed contiguous to agricultural land uses creates some major conflicts. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-17 The conflicts arise from both the agricultural community fearing restrictions being placed on their operational aspects, which do quite often become reality. On the other side, the urban users, many of whom are not that familiar with the nature of agricultural operations, complain about dust, noise, odor, and traffic due to large equipment and aerial applications of pesticide and herbicide. In this case however there is a significant separation between the eastern boundary of the project site and the western boundary of the adjacent agricultural field. The Alder Drain, a wall, and associated IID dirt roads provide a buffer of 60 to 75 feet. There will also be a significant amount of space as buffer that will be used for the truck loading area behind the Outlet Mall. The specific distance will be determined when the site plan is completed. 2. Residential – There are no adjacent Residential areas near project area. “The project will include appropriate Landscaping and mitigation measures to ensure compatibility to future residential projects.” 3. Commercial – A large scale freight truck storage facility is located across Heber Road, directly to the south of the project site. The truck facility is on land which is partly zoned for commercial and partly zoned for industrial. Our project and the truck storage facility are buffered by a 126’ right of way for Heber Road. 4. Industrial – A large scale freight truck storage facility is located across Heber Road, directly to the south of the project site. The truck facility is on land which is partly zoned for commercial and partly zoned for industrial. Our project and the truck storage facility are buffered by a 126’ right of way for Heber Road. 5. Open Space/Parks – Agricultural is considered open space, therefore the project will mitigate any impacts to agricultural uses. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-18 6. Schools – There are no schools adjacent to agricultural 7. Airport – There are no immediate airport facilities to the project area. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 5-19 6. DESIGN STANDARDS The following section provides architectural guidelines for buildings and signs at the Imperial Center. DESIGN CONCEPT The Imperial Center project is designed as independent but interwoven cluster of commercial buildings, plazas and functions. The overall design is an interpretation on a Southern California/Latin American flavor. There are many plazas/courtyards; geometric design patterns and heavy saturated color schemes. The theme is taken from the sunny naturalistic aspect of its environment. Everything is bright and colorful, and the motifs are taken from elements such as sun, water, river, and stars. The combined experience is that of a cheerful, festive shopping experience. Figure 6-A Analysis diagram Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-1 1. Outlet Center The heart of the development is the Outlet Center. The general layout is fashioned after an out door mall for the display, shopping area while a functional and efficient network of loading area is provided at the perimeter of the mall behind the warehouse area. A major hotel complex, entertainment complex, information center, show area, auction house and an outdoor auction plaza and central food court are proposed facilities of the Outlet component. A meandering pedestrian traffic spine is proposed to connect these facilities. Each wholesale outlet will have a front shopping/display area facing the pedestrian walkway, with a warehouse facility in the back facing the loading zone. Figure 6 - B Proposed Sun Court Auction Area/Factory Outlet 2. Convenience Store & Gas Station The other major component is a proposed convenience store and gas station at the major intersection of Heber Road and Highway 111. The convenience store and gas station is intended to cater Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-2 to the local, regional, and international travelers passing through the border between California and Mexico. It will have an island of gas pumps that will be designed to service a variety of vehicles from motorcycles to large trucks. The facility is situated next to the freeway to obtain great exposure and easy access for the travelers. The same design patterns and motif will be carried out here. The gas station may have a maximum of eighteen (18) filling Vehicle Fueling Positions (VFP) and three islands. VFP’s are the number of vehicles that can be fueled simultaneously at a service station. For example, if a service station has three product dispensers with three hoses and grades of gasoline on each side, where only one vehicle can be serviced at a time on each side, the number of vehicle fueling positions would be six." (Institute of Transportation Engineers, Independent Variables) With three islands and three product dispensers per island, the total VFP’s would equal eighteen (18). Figure 6 - C Convenience Store & Gas Station 3. Commercial Lots Finally, there are free standing commercial parcels for any future developments that will add diversity and enhance the total experience of the Imperial Center. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-3 4. Parking Central parking spaces will be provided with adequate entry/exit signs to ensure convenient parking to the center. BUILDINGS Architectural design integrity will be ensured within the Imperial Center by consideration of the following architectural guidelines. 1. Buildings shall be designed with sensitivity for the local desert environmental conditions. Openings and entries to buildings should be clearly defined and accented with architectural elements and plant materials for orientation. 2. The scale of the project should be given careful consideration. Building placement should vary to include both parallel and skewed angles to the street, in order to provide diversity and discourage long, uninterrupted expanses of façade. 3. All building sides are to be considered. Buildings shall not have a special treatment only on the façade facing public street rights- of-way. The architectural concept must be consistent on all sides of the building, although the intensity of treatment may vary. In this regard, extra treatment may be given to the primary street frontage side of the building, as long as the basic façade treatment is carried around the structure. 4. Any accessory building and/or enclosures, whether attached to the main building or not, must be of similar design and materials to the main building. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-4 5. Rooftop mechanical equipment shall be completely screened by architectural means such as parapet walls or rooftop wells, which are integrated into the building’s architecture. The use of picket-fence type screening is prohibited. 6. Trash bins and Ground mounted equipment shall be completely screened. Screening shall meet County requirements for materials and size. Enclosures shall be consistent with the Center’s architectural requirements. 7. Permanent buildings of mobile/modular construction are prohibited. Figure 6 – D Contemporary designed Factory Outlets such as Carlsbad Co. Stores, (Carlsbad, CA), have served as regional retail catalysts Building Mass Building exterior walls shall be visually reduced to human scale by: 1. Fragmenting the structures into smaller or multiple walls in order to create a three dimensional appearance. 2. Creating horizontal shadow lines. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-5 3. Clustering small-scale features, such as planter walls around major building forms. Building Materials Building materials are to be durable, aesthetically pleasing, and relatively maintenance free, including stucco and mission tiles. Changes in texture, relief, and/or materials are encouraged. The following building materials are encouraged to be used though out the Imperial Center. 1. Exterior Wall Finishes - Exterior wall finishes are to be uniform textured appearance. Acceptable materials include sandblasted concrete, masonry, exterior cement plaster, architectural metal panels and glass. 2. Concreter – Textured forms or sandblasting should be utilized for tilt-up construction panels. Smooth concrete features should have either integral color or painted surfaces. 3. Masonry – Brick must be hard fired face brick in earth tone, medium range colors. Standard concrete block is acceptable however; no more than fifty percent of the concrete block exterior wall elevation should be made of a single color or texture. Artificial stone is discouraged. 4. Exterior Cement Plaster – Textures are limited to machine spraying and light had trowel or float finished. 5. Architectural Metal Panels – Metal panels should not be highly reflective. Corrugated metal panels are prohibited. 6. Roof Materials - Clay tile and colored pre finished standing seam metal roofs are encouraged. Flat roof designs require crushed rock or similar uniform Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-6 coverage treatment when the roof is visible from adjacent properties. Crushed rock and metal rood are to be of approved earth tone color. COLORS Building facades should be designed with patterns and colors that reflect Southern California / Latin American flavors. Color variations should be strong with high contrast. SIGNS The following guidelines have been provided for signs in the Imperial Center. Refer to figures at the end of this section. 1. Standards for Monument Signs Freestanding monument signs shall comply with all of the following standards. a. No monument sign shall be located within the existing road right-of-way or designated future road right-of-way. b. The maximum height of a monument sign shall not exceed six feet (6’) above average lot elevation, measured within radius of thirty feet (30”) from the center of the sign. c. The monument sign shall be a minimum of ten feet (10”) from any common property line; they shall be no closer than twenty feet (20’) on center on any property or between properties. d. Lighting of monument signs shall be arranged and installed as not to produce glare on other properties in the vicinity or upon the adjacent highway. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-7 e. Monument signs shall be no closer than five feet (5’) to a public right-of-way. f. Monument signs shall be constructed of durable materials and maintained in an aesthetic acceptable fashion. 2. Outlet Center Pylon Sign Figure 6 – E Proposed Imperial Center Pylon Sign Site pylon signs are designed to identify the presence of the “Imperial Center”. It shall be visible from Highway 111. The maximum height of the pylon signs is sixty feet (60’). A maximum of two pylon signs may be built; one at near the East end of the site; one at West end of the site; one at the middle of the site. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-8 a. Signs shall be located so that no part of the sign extends into or beyond any existing street right-of-way or any proposed street right-of- way. b. Lighting of signs shall be arranged so as not to produce glare on other adjacent properties in the vicinity or upon adjacent highways. c. Signs shall be at least three feet (3’) back from public right-of-way lines. d. Signs shall be engineered and erected to withstand minimum wind velocities per all UBC requirements. 2. Entry Gate Sign Figure 6 – F Imperial Center Prototype Entryway Sign The Entry Gate sign is located at “Imperial Center” Entry Area. a. The maximum height of the entry gate sign shall not exceed six feet (6’) in height. Except at the light fixture, which is at eight (8’) high. b. Lighting of monument signs shall be so arranged and installed as not to produce glare Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-9 on other properties in the vicinity or upon the adjacent highway. c. Monument signs shall be no closer than five feet (5’) to a public right-of-way. d. Monument signs shall be constructed of durable materials and maintained in an aesthetic acceptable fashion. 3. Standards for Signs Attached to Buildings Figure 6 – G Imperial Center Prototype Store Blade Sign Within the retail commercial areas, signs such as the blade sign identified above, may be attached to a building or wall shall and shall comply with all of the following standards: a. All signs attached to a building or a wall shall be attached flat against the building or wall and parallel thereto and shall not extend more than eighteen inches (18”) from the surface of the building;/wall. Exceptions to this provision are as follows: i. A separate comprehensive sign program shall be adopted for all outlet Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-10 center signs. Items “ii” to “v” do not apply. ii. Signs may be mounted below the soffit of a canopy, or over-hang or below a porch and ma be perpendicular to the building provided that they do not exceed twelve inches (12”) above the soffit or beam and maintain a minimum of eight feet (8’) vertical clearance above any travel way, corridor, exit or court. iii. Signs may be attached to a building provided they do not exceed four feet (4’) in height by six feet (6’) in width. In addition, the signs will not exceed height limitations set forth elsewhere in this plan and will not contribute to the roof loading. iv. Lighting of signs attached to buildings shall be arranged as not to produce glare on adjacent properties in the vicinity and the source of light shall not be visible from adjacent property or public street. v. Under Canopy/parapet signs shall be encouraged. The signs are to be mounted to maintain minimum of eight feet (8’) vertical clearance above any travel way, and can extend maximum three (3’) perpendicular to the building. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-11 4. Fueling Station Signs Figure 6 – H Imperial Center Prototype Fuel Service Sign The following sign criteria shall apply to fuel service stations: a. Wall or Canopy Signs shall be limited to 2 signs per building, 1 sign per building face, not to exceed 20% of building face. b. Freestanding Signs shall be limited to 1 per street frontage, not to exceed a total of 3 per facility. c. Sign area shall be limited to a maximum area of 40 square feet, 8 feet high with minor review. d. Special service signs shall be limited to such items as self-service, full-serve, air, water, and cashier. Signs shall not be illuminated. e. Price sign (freestanding) shall be limited to 1 per street frontage, not to exceed a total of 2 per station. Each sign shall not exceed 20 square feet for price sign. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-12 5. Internal Mall Signage Figure 6 – I Imperial Center Prototype Directory Sign Each commercial enterprise within the Imperial Center shall be required to adhere to strict signage requirements whereupon there are common design elements, colors and motifs throughout the entire commercial complex. MAINTENANCE 1. Buildings All buildings and other improvements shall be kept in good condition, and adequately painted or otherwise finished to present a crisp and well kept appearance. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-13 2. Signs All signs shall be kept in good operating condition. All signs shall be adequately maintained and kept in good repair. IMPERIAL CENTER ARCHITECTURAL GUIDELINES The architectural design guidelines for Imperial Center are as follows: 1. The massing, composition, materials, and site position of residential homes should be complementary to the surrounding land to achieve compatibility. The height and bulk of buildings should be compatible in scale, to the size, shape, and topography of the site and should be harmonious with the setting. 2. Architectural stylistic themes should give an identity to the neighborhoods of Imperial Center. 3. Architecture within Imperial Center should evoke the traditional and contemporary material, form, and colors that have evolved over time in the Imperial and the Southern California region. 4. Within individual planning areas, architectural diversity should be created by manipulating building scale, building materials, colors, and textures in conjunction with architectural features (for example, roofs, windows, doors, fascias, and trim), rather than by designing homes that my vary greatly in architectural style. 5. Roofs shall be constructed of nonflammable materials such as clay, terra cotta, concrete tile, or other material consistent with the architecture. Metal equipment not visible from public areas may be used. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-14 Figure 6 – J Imperial Center Major Signage Locations Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-15 LIGHTING 1. Mall and Pedestrian Area Lighting Lighting standards and security lighting serving the various commercial uses shall be designed to prevent glare and in accordance with County of Imperial regulations. Figure 6 – K Imperial Center Prototype mounted wall light and mall / street lighting Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-16 2. Parking lot lighting Each plan for construction of a building with onsite parking must include the following: a. An exterior lighting (photometric) plan consisting of a point-by-point foot-candle layout (based on a ten foot grid center) extending a minimum of twenty (20) feet outside the property lines. This required photometric plan must be prepared by an electrical engineer registered in the State of California. b. The design of lighting fixture and their structural support must be architecturally compatible with the project’s building and property. c. Illumination or glare from the exterior lighting system onto adjacent properties or streets shall be minimized to the maximum extent feasible. d. Lighting intensity must provide a minimum 1½-foot candle. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 6-17 7. LANDSCAPE GUIDELINES The goal for the landscape section of the Imperial Center Specific Plan is to provide a prominent visual impact to the community and travelers along Highway 111. The landscaping design should reflect the scale and hierarchy of vehicular travel ways and should compliment the architectural design. This section illustrates and functions as a landscape design manual that supplements the Imperial Center Specific Plan. The following landscape guidelines are organized in three areas: A. General Design Criteria and Plant Material Selection B. Parcel / Lot Landscape Design Center C. Landscape Plant Material List GENERAL DESIGN CRITERIA The following two sections establish a framework for the design of landscape settings and selection of plant material: 1. Streetscape design and plant material selection should be made with several factors in mind, including: • Applying the “Xericscape Principle” where an efficient landscape program provides specifically designed irrigation systems to plant materials with similar watering needs. • Scale and hierarchy of associated arterials or streets. • Travel speed of individual arterials or streets. • Design compatibility or image with adjacent land use or landscape setting. • Safe and unobtrusive landscaping so as to provide safe traffic flow and to prevent Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-1 landscaping from obstructing prominent signs and architectural features. The following streetscapes should be designed as stated below: a) State Route-111 Landscaping placed adjacent to the right-of-way of Highway 111 should also be coordinated with Cal- trans. Recommended street trees for State Route-111 are outlined in the Landscape Plant Material List. Drought-tolerant species with an ornamental quality are recommended. Minimum tree size: 15-gallon containers or (cid:137) equal/palm: 10ft. brown trunk height. Trees to landscape area ratio: One tree every (cid:137) 40 LF of landscaped right-of-way. b) Heber Road and Abatti Road A limited plant palette of trees is recommended in order to maintain an ordered and uniform appearance along these two roads. Recommended street trees are outlined in the Landscape Plant Material List. The trees have been selected based on the image and scale qualities of streets and adjacent land uses. Minimum tree size: 15-gallon containers or (cid:137) equal/palm: 10ft. brown trunk height. Trees to landscape area ratio: One tree every (cid:137) 40 LF of landscaped right-of-way. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-2 c) Yourman Road Yourman Road will be localized in character, meaning it will be oriented to and serving individual commercial parcels. A variety of plant material in the form of trees, scrubs, and groundcovers will appear within the street-oriented frontage of individual parcels as part of a natural process of incremental development. The close proximity of individual parcels and interaction of pedestrians within collector and local streetscapes requires special attention to selection of plant material that is aesthetically pleasing, durable under heavy foot traffic, and easy to maintain. The Landscape Plant Material List outlines a selection of characteristic trees for streetscapes. Selected trees are representative of smaller-scale ornamental trees suited to collector and local streets. Minimum tree size: 15-gallon containers or (cid:137) equal. Tree to landscape area ratio: One tree every (cid:137) 40 LF of landscaped right-of-way. d) Imperial Center Special Intersections The Imperial Center has two special intersections (Yourman/Heber Road and Yourman/Arbatti Road) that define the primary entry points. The design intent of Imperial Center special intersections is to identify visual nodes at these two intersections; thus, limits should be established in defining the various entry boundaries. Imperial Center special intersections should reflect the quality and image of adjacent developments. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-3 Figure 7 – A Imperial Center Proposed Street Landscaping Within the Imperial Center special intersections, if necessary, the use of lawn as a predominant groundcover is recommended of the limited dimensions of entry areas and the images expressed of a refined and well-maintained commercial/industrial district. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-4 Minimum tree size: 24” box containers. (cid:137) Tree to landscape area ratio: One tree for (cid:137) every 600 SF of landscaped right-of-way and or setback area. Medians (Center Islands) 1. The planting area of medians shall be minimum width of 6 feet. Maintenance walks along curbs shall be a minimum width of 1.0 foot. Turn-pocket noses will not be planted, unless they are wider than 5 feet. 2. Planting areas must be graded to drain excess surface water through a system of inlets and drainage pipes, and carried away to the street’s storm drainage system. All required paved surfaces in medians and maintenance aprons shall be textured and colored concrete or inlaid pavers to complement other materials. High-flow drip irrigation shall be used in medians. 3. Tree selections and spacing should allow for one vehicle visual clearance and architectural/sign visual clearance at maturity. Groundcover and shrubs should not exceed a height of 36 inches. It is recommended that drought-tolerant shrubs or turf substitutes be used in these areas. Detentions Basin Design 1. Detentions basins, as required, are to be integrated with adjacent landscaping within the setbacks of individuals parcels. The design of detention basins shall express a natural appearance while incorporating proper engineering techniques. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-5 2. Concrete lined basins are not allowed. The surface area of basins shall incorporate a combination of aggregate rock material and landscape vegetation. The purpose of the rock material and vegetation is to prevent soil erosion while allowing water infiltration into the surrounding soil. 3. The aggregate rock material shall include a combination of crushed rock of varying sizes and large cobbles. Landscaping vegetation shall be a low, prostrate, drought tolerant plant material. Plant material should be introduced within the aggregate rock basin in a random/natural layout. 4. Detention basins are to be cleared and maintained in the same fashion as other parcel landscape areas. PARCEL/LOT LANDSCAPE DESIGN CRITERIA - It is required that the lot or premises not devoted to buildings, structures, driveways, sidewalks, outdoor storage, or loading areas be landscaped prior to the use or occupancy of any lot or premises. Areas designed for future development or expansion need only be required to adequately control dust and erosion. A recommended mitigation for this application includes the preparation of a Dust Mitigation Plan. Landscaping must be provided and maintained on all parcels, including street right-of-way areas, in accordance with the following standards: a) All front-yard and side-yard areas must be landscaped. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-6 b) Ten Percent of all developed area shall be landscaped. Planting of trees at a minimum ratio of one tree per 600 SF of landscaping and, within landscaped medians, parkways parking lot landscaped strips one tree on center at least every 40 feet. A minimum of 25% of the required trees shall be a minimum of 24-inch box size when planted. Other trees shall be a minimum of 15- gallons or equal in size when planted. c) For all off-street parking areas of five or more spaces, 5% of the parking areas shall be landscaped. Required landscaping shall be evenly distributed throughout the parking area, including appropriate number of trees. d) Landscaping shall include a balance mix of trees, scrubs, and groundcovers. Groundcover shall be a minimum of 50% vegetative. Non-vegetative groundcover may include rocks, wood chips, pavers and other artificial cover. e) Efficient irrigation systems and grouping plant materials with similar watering needs is key to the xeriscape concept adopted for landscape areas within the “Imperial Center”. All irrigation systems shall contain an adequate backflow prevention device. f) All landscaped areas shall be maintained in a clean, neat, and healthy condition. Maintenance shall include proper watering, fertilizing, weeding, removing litter, and replacement of plants when necessary. g) Landscape plan submittals shall include the following: Site Plan: indicate type, size, and location of (cid:137) all landscaping materials. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-7 Site Distance - Landscaping at all intersections (cid:137) shall be identified and placed to indicate a safe site distance to the satisfaction of the County of Imperial. Irrigation plan – Plan shall be separate from (cid:137) the planting plan and shall be concise, accurate and approved by Imperial County. The irrigations system should include low-flow, matched precipitation rate heads, drip irrigation, check valves to prevent low head drainage, appropriate pressure regulation, an automatic controller suitable to both spray and drip irrigation, and a rain sensing automatic shut off device. All spray heads should be adjusted to prevent over spray onto paved surfaces and walls. Over spray adjustments should be made during regular maintenance inspections. A post installation water audit will be required to determine actual precipitation rates and the distribution uniformity for the irrigation system. Planting Plan--Shall include, but not be limited (cid:137) to, all existing plant material to be retained (called out by caliper size), a legend listing the common and botanical plant names and total quantities by container size and species. Water management plan; details including (cid:137) specifications, notes, legends, and water requirements schedule necessary for a complete landscape plan review; and Elevation Plan--Shall include a building (cid:137) elevation with proposed plant material(s). Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-8 h) Detention basins are to be incorporated as a landscape feature. Where possible, efforts should be made to combine adjacent parcel basins. Combining basins will conserve usable area and enhance overall street appearance. i) Drought-tolerant plantings are not recommended in low basin type landscape areas or along the toes of large slope areas, due to irrigation water collecting at the base of the slopes. j) Each individual parcel will be landscaped with a design that blends in with the overall planting scheme of Imperial Center. A plant palette will be created which takes into consideration the desert environment by utilizing water resources in an efficient and conservative manner. Planting will be required to be grouped in hydro zones. Bark mulches (min. 3”) will be required to cut down on evaporation and to discourage weed growth. Bubblers and drip irrigation will be recommended where appropriate and modern equipment such as low precipitation heads, automatic controllers and rain sensing devices will be required. k) Reclaimed water – Reclaimed water will be used at the Project Area. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-9 Figure 7 – B Tree rows are planned throughout the Imperial Center LANDSCAPE PLANT MATERIAL LIST The following lists of trees have been prepared to help identify appropriate trees for each streetscape “zone” and related site condition. The list does not include all the trees that may be found to be appropriate for the “Imperial Center”. In an effort to maintain a sense of continuity, order, and cohesive development design, the following trees are noted as approved trees for the “Imperial Center”. 1. Theme Tree: Palm Tree Palm trees, in the form of Fan Palms and Date Palms, are a prominent skyline feature and landmark of Imperial Valley. Palm trees are symbolic of the Valley’s indigenous landscape character, the low desert of the southwest region. Because of the palms’ unique and attractive contribution to the Imperial Valley landscape, palm varieties should be prominently woven into the landscape settings of the “Imperial Center”. Specific palm tree varieties are recommended for the various streetscape zones of the “Imperial Center”. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-10 a) Recommended Street Trees for Highway 111 Brachychiton Populneus Bottle Tree Ficus retusa Indian Laurel Fig Fraxinus uhdei Evergreen Ash Pinus spp. Pine Tree Pistacia chinensis Chinese Pistache Querus virginiana Southern Live Oak Schinus molle California Pepper Ulmus parvifolia Chinese Elm Washington filifera** California Fan Palm** Wahingtonia robusta*Mexican Fan Palm* Nyctaginaceae Bougainvillea *Primary street tree (60% minimum of plantings) along State Route-111. **Recommended for use at Special Intersections. b) Recommended Street Trees for Heber and Abatti Road Brachychiton populneus Bottle Tree Ceeratonia siliqua Carob Tree Cupressus glabra Smooth Arizona Cypress Ficus retusaIndian Indian Laurel Fig Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-11 Lagerstroemia indica Crape Myrtle Olea europaea Olive Phoenix Carariensis** Canary Island Date Palm** Phoenix dactylifera** Date Palm Pinus spp. Pine Tree Prosopis Mesquite Querus viriniana Southern Live Oak Schinus Molle California Pepper Ulmus parvifolia Chinese Elm Washington Filifera** CaliforniaFan Palm** Washington robusta* Mexican Fan Palm* *Primary street tree (60% minimum of planting). **Recommended for use at special intersections. c) Recommended Street Trees for Yourman Road All Imperial Center Major and Imperial Center Collector trees including the following: Acacia spp. Acacia Albizia julibrissin Silk Tree Chilopsis linearis Desert Willow Ficus retusa Indian Laurel Fig Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-12 Fraxinus uhdei Evergreen Ash Jacaranda mimosifolia Jacaranda Parkinsonia aculeate Mexican Palo Verde Schinus terebinthifolius Brazilian Pepper Ulmus parvifolia Chinese Elm Washington Filifera California Fan Palm Washington robusta* Mexican Fan Palm* d) Recommended Street Trees for Imperial Center Commercial Streetscapes Brachychiton populneus Bottle Tree Ceratonia siliqua Carob Tree Cupressus glabra Smooth Arizona Cypress Ficus retusa Indian Laurel Fig Fraxinus uhdei Evergreen Ash Lagerstroemia indica Crape Myrtle Olea europaea Olive Phoenix dactylifera Date Palm Pinus spp. Pine Tree Prosopis Mesquite Querus virginiana Southern Live Oak Schinus molle California Pepper Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-13 Ulmus parvifolia Chinese Elm Washington Filifera California Fan Palm Washington robusta* Mexican Fan Palm* *Primary street tree (100% minimum of plantings within street right-of-way). MAINTENANCE 1. Landscape Maintenance All landscaping on a given property shall be maintained by the owner of each property according to the best standards practices in the industry for high-quality landscaping. Mowing, pruning, trimming, and feeding of plants must be accompanied periodically according to the season. Special care must be given to all plant material during the first year. Should any tree, shrub, or portion of groundcover suffer from improper irrigation, improper fertilization, damage due to insects or fungus resulting in weak or stunted growth, or from climate extremes, the plants must be replaced in a timely manner. Repairs necessary to keep the irrigation system operating efficiently must be done by the property owner in an expeditious manner. 2. Area Maintenance All walks, drives, parking areas, and service entries shall be kept free form litter and soil by the property owner or his designee. a. All areas of the property shall be kept clean and attractive. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-14 b. Unsightly accumulation of trash, weeds, or rubbish is prohibited. c. All landscaping debris shall be properly disposed. Landscape Guidelines The landscape theme for Imperial Center should unify the Precise Plan area and provide an aesthetically pleasing effect. Landscape treatment also should provide for appropriate transitions between development and open space. These guidelines will ensure that the Precise Plan area is landscaped in a manner to establish a sense of community character. 1. General Landscape Guidelines a) Water should be conserved through low-water-using planting and irrigation design. b) Fire risk shall be minimized by the management of flammable vegetation. c) Streetscapes and entry treatments should be designed to promote community character and should consist of trees, and groundcovers, which are selected to establish a district character or theme for the project. Streetscape options, depicts various designs of streets that can be implemented in Imperial Center. d) All manufactured slopes over ten feet (10’) in height shall be planted with erosion control, fire resistant and self- sufficient plantings. e) A compatible plant palette of trees, shrubs and ground covers shall be used throughout the Precise Plan area. Once a particular plant or plant combination is used for a particular application, it us to be repeated in similar areas of the project to reinforce a sense of neighborhood Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-15 cohesion. Landscape design should not, however, result in monotony or lack of variety or biological diversity. Figure 7 – C Imperial Center Commercial Streetscape Concept Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-16 2. Irrigation System The irrigation system for improved areas should be permanent, automatic system, programmed to deliver adequate soil moisture as determined by the depth of the root zone. The soil moisture attained should promote vigorous growth of all plant materials. The system should be maintained in good working order, and the cleaning and adjustments to the system should be part of the regular maintenance activities. Any irrigation system installed for the purpose of re-vegetating disturbed material adjacent to natural open space should be of a temporary nature and may be removed after re-vegetation has occurred. All landscape catch basins, swales, channels, and other drainage devices should be maintained in a state conducive to conducting water in a free-flowing condition. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 7-17 8. INFRASTRUCTURE PLAN This section provides planning information for infrastructure at the Imperial Center. TRAFFIC CIRCULATION Heber Road will be the main entrance to the project. Traffic can either enter off State Route Highway 111 onto Heber by a right hand turn for traffic heading north on State Route Highway 111 or a left hand turn for traffic heading south. The section of Yourman Road that runs along the west side boundary of the project will be closed to public use. This section of Yourman Road will be realigned to bi-sect the project from the north and exit the project in its southeastern corner. Yourman Road north of the project will remain open. It can serve as an alternate ingress and egress route to or from the project via Abatti Road. Based on field observations, it is recommended that Heber Road be widened to six lanes prior to final build out to provide the necessary capacity at the Highway 111 intersection and the project driveways. The developer shall pay the fair share of warranted signals as per consultant’s findings. (See traffic study prepared by Dahl Robbins & Associates - Volume Two, Appendix B, with an updated Traffic Study prepared by Linscott, Law & Greenspan) Figure 8 -A SR 111 looking southbound proximate to the Imperial Center Specific Plan site Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-1 1. Primary Entrance The primary entrance to Imperial Center will be by way of Highway 111 and Heber Road. Site Access Imperial Center’s main access will be from Heber Road. Vehicles can either make a left hand turn off of Highway 111 for those heading south or a right hand turn off of Highway 111 for those heading north. Those vehicles traveling west along Heber Road would make a right hand turn. The section of Yourman Road to the west of the project will be closed to public traffic. Yourman Road will be re-aligned to enter the development from the South on the Southeast side of the property. This alignment will result in the development of a Hotel, convenience store/gas station and stand alone retail pads and respective parking to the west of the new alignment and the main development consisting of an Auction Center, Warehouse, Outlet Center, Food Court and Cinema to the east of the new alignment. Secondary access can be made by way of Abatti Road where it meets with Yourman Road which will still remain open to the north of the project. On-site Improvements See Traffic Report (Appendix B) & Chapter 11, Environmental Issues & Mitigation. 2. Site Access Streets According to the County of Imperial Public Road Standards, Primary Arterials should have a minimum 126 feet of Right-of-Way (R/W). Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-2 Minor Arterials should have a minimum R/W of 102 feet. Major Collector Roads should have a minimum R/W of 84 feet. Minor Collectors should have a minimum R/W of 70 feet. Local Streets should have a minimum R/W of 60 feet. Off-site Improvements See Traffic Report (Appendix B) & Chapter 11, Environmental Issues & Mitigation. 3. Heber Road It is recommended that Heber Road be widened to five lanes prior to Phase D (2010- 15) development from Abatti Road on the west to the east edge of the project. This will provide the necessary capacity at the Highway 111 intersection and the project driveways. 4. Jasper Road and Highway 111 A traffic signal will likely be warranted at Highway 111 and Jasper Road intersection with the addition of Phase A traffic. Though this phase adds little traffic to this intersection, the intersection is currently operating at poor levels of service. This project will add an additional 1,084 trips to this intersection at build-out. Currently, the Jasper Road is closed going East from 111. This is a temporary closer and will be reopened as CALTRANS installs traffic signals to the intersection. This improvement will help mitigate some of the traffic impacts caused by the Imperial Center. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-3 5. McCabe Road & Highway 111 A traffic signal will likely be warranted at the Highway 111 and McCabe Road intersection at project build-out. This intersection is currently operating at poor levels of service for eastbound and westbound traffic. This project will add an additional 630 trips to this intersection at build-out. It is also recommended that McCabe Road be marked with two lanes approaching the intersection, a left turn lane and a combined through/right turn lane. Currently, the McCabe Road is closed going West from 111. This is a temporary closer and will be reopened as CALTRANS installs traffic signals to the intersection. This improvement will help mitigate some of the traffic impacts caused by the Imperial Center. 6. Yourman Road and Heber Road In addition to the previously described improvements to Heber Road, a traffic signal will be needed at this intersection with the addition of Phase D (2010-15) traffic. The Level of Service calculations show a northbound Level of Service of D in 2006, but if the roadway is realigned as proposed, this will not be the case. It will be important to coordinate this signal with the signal on Highway 111 so that backups do not occur along Heber Road. The design of all intersections and roadways shall be accordance with Cal Trans Standard Drawings, Imperial County Public Works guidelines, and the latest editions of the MUTCD and AASHTO Green Book. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-4 PUBLIC SERVICES Sewer & Water Currently, the Heber Public Utility District (HPUD) is not able to provide future water service to the Imperial Center Specific Plan Area. Although, it is currently in the process of upgrading its water plant. With this new capacity, HPUD will be able to offer both sewer and water services to the Imperial Center. The Imperial Center will have three different alternatives to pursue to provide the development within the specific plan area sewer and water services. These alternatives are all feasible. Which alternative the developers of Imperial Center will select will depend on developer goals. Alternative One 1. Sewer The sanitary sewer improvements proposed for Alternative One are to include a local collection system consisting of gravity flow lines located in the streets of the proposed Imperial Center Subdivision. A 12” gravity flow line is to run along the west side of the project site to provide service to the areas south of the project site as they are developed. An on-site (self-serving) treatment facility will be provided. The facility is to be purchased and owned by the landowner (with HPUD approval). The landowner will pay for maintenance; however, HPUD will operate the on-site facility. This alternative includes a combination of gravity flow lines, pumping stations and force main lines. A 12” gravity flow line is to run along the west side of the project site to Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-5 provide service to the areas south of the project site as they are developed. a. Type of Facility Needed The following information was assessed to address sewer treatment facilities for the Imperial Center. The following information is based on treatment for up to 75,000 Gallons/Day: i. 10,000 S.F. Building ii. Sand/Rock Filter iii. Estimated installation cost is $8.50/Gal treated = $637.500 iv. Add ozonation to effluent that will meet disinfection criteria of title 22 reclaimed water for irrigation - add $1.50/Gal for this upgrade v. Effluent Quality = 2 mg/l BODs & suspended solids iv. Power Consumption 55 to 60 KWH/Day (about $4.50/day) b. Location Lot 3 of the project area will be the temporary location of the sewer facility. c. Sewage Discharge i. It is assumed that 80 percent of the water supplied to a connection is sent to the sewer systems. Based on that assumption, the sewer flow for Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-6 such areas will be approximately 40 gallons per person per day, while peak flow is 2 times the average flow, therefore: ii. Average Flow: (40 p/ac x 40 gd/p) /(24hrs x 60 min) = 1.11 gpm/ac. iii. Peak Flow: 1.11 gpm/ac x 2 = 2.22 gpm/ac. iv. Sewer discharge required for the 77.64-acre parcel is 2.22 gpm/ac x 77.64 = 172.36 gpm. d. Temporary Septic and Leech Field i. As permitted by Imperial County Department of Health Services, sewage treatment can be scaled down by using temporary septic tank and leach field systems installed at the temporary wastewater treatment plant site as well as the lift station site in the western basin. Such a system shall not be installed after the infrastructure from HPUD is extended to the project site or the packaged plant system is constructed. All septic tank and leach field systems will be installed in with approval from and in accordance to the County of Imperial Environmental Services Department. ii. Each septic system will be sized to handle approximately 25 thousand GPD. Once one or both of these temporary systems Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-7 reach their capacity, transition into a packaged plant or first phase pond-based wastewater treatment system will be implemented at the permanent treatment plant site thus terminating the use of both of the temporary facilities. Collection and conveyance pipelines will be installed concurrently with the initial backbone roads and as more fully described in the appropriate final engineering improvement plans. 2. Water & Water Facilities Plan Alternative One provides for a plan to accommodate the Imperial Center water demands. This alternative calls for the Imperial Center Specific Plan area to be annexed into the Heber Public Utility District service area. The water plant will be located in Lot 3 in the northern section of the project. It will be located adjacent to the sewer plant. The water plant will be located an appropriate distance from the sewer plant as determined by the Heber Public Utility District and State of California. The following is a summary of the plan to construct and operate a water plant within the Imperial Center Specific Plan Area: • Total area of the water facility will be approximately four acres. • Water Plant building (50’ x 40’). • Potable Water Tank Storage (600,000 gallons) Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-8 • The water plant will contain two water ponds with a total volume of 874,528 gallons. • Peak fire capacity = 2,000 gallons per minute for a four (4) hour duration plus domestic. • Potable Water Pumps: 2,000 Gallons per Minute @ 80 psi • Raw Water Irrigation Pumps: 200 Gallons per Minute @ 60 psi The minimum and maximum potable water use for the project is estimated to be 100,000 gallons per day (gpd) and 200,000 gpd respectively, irrigation water is an additional 37,5000 and 70,000 gpd respectively. For planning purposes 200,000 was assumed to be the average day water demand for the project. This estimate represents the high side of water usage should be reevaluated as development proceeds to determine if some facilities proposed could be reduced in size. Table 8-1 provides the water use factors used to estimate project flows. Table 8-1 Water Use Factors LAND USE MINIMUM MAXIMUM Potable 1250 GPD/AC 2500 GPD/AC Irrigation 500 gpd/ac 1000 gpd/ac Peaking factors of 2 and 4 were used to estimate maximum day and peak hour demands respectively. The water distribution system was sized to provide a 2,000 gpm fire flow under maximum day demands with a residual pressure of no less than 20 psi or no more than 10 psi pressure drop anywhere in the system under peak hour demands, whichever is greater. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-9 Water storage, treatment and pumping facilities will all be located on on-site. The source of water for the project will be Imperial Irrigation district’s All American Canal. Storage for the project will be kept in a potable water tank and raw water reservoir, then the All American Canal. The potable water reservoir will hold two average day’s storage plus fire flow requirements. The raw water reservoir will hold seven and a half days storage requirement. Water will flow by gravity to the raw water reservoir and will be pump to the water treatment plan when needed. The treatment plant is proposed to be a package system, consisting of modular units, where each unit contains a rapid mix tank, flocculation tank, settling basin and a filter. The modular unit concept will allow the treatment plant to be constructed incrementally, as needed. Once water passes through the treatment plant, it will flow by gravity to the treated water storage tank. A potable water booster pump station will pump water from the treated storage tank to the water distribution system. The distribution system will have a 12 inch diameter pipe looped within the project which will allow the project to be phased while still maintaining the infrastructure necessary to provide fire flow. Design and operations of the water treatment facilities, storage reservoirs, and distribution systems will conform to guidelines from the following: • California Department of Health Services Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-10 • County Department of Health Services Environmental Health • Air Pollution Control District • Department of Water Resources Division of Safety of Dams • Insurance Services Office • National Fire Protection Code Water facilities discussed in this plan are preliminary and may be re-evaluated as development proceeds. Additional water facility options may be proposed and approved as part of the tentative mapping process. For example, smaller pipes may be used if originally anticipated water demands are less than anticipated. Exhibit 1 provides a graphical detail of the proposed Alternative One. Reclaimed Water Imperial Center In an effort to conserve water at the Center, this Alternative will use reclaimed water for all landscaping on site. Standards shall meet County requirements. As an alternative, the Imperial Center management may wish to undertake landscaping irrigation with nearby agricultural water. Alternative Two HPUD would provide both water and sewer services to HPUD in Alternative Two. Alternative Two proposes to extend single project specific sewer and water lines to the Imperial Center project. This alternative would include upgrading the capacity of HPUD’s water plant. As stated above, this alternative would have a single project specific eight inch water line Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-11 extended from an existing point of connection to Imperial Center. Likewise, a 12 inch force main sewer line will be extended from an existing point of connection to Imperial Center. Two pump stations, one for both sewer and water, would be utilized in this alternative. It would not include a looped infrastructure water lines. Alternative Two would provide water to the Imperial Center during peak hours using water that will be stored in a 800,000 gallon water tank. This tank will be located in Lot 3 on the tentative map. HPUD would replenish the tank during off-peak hours. Fire pressure and water availability would be sufficient to satisfy all fire protection needs. Alternative Two is estimated to cost $2.3 million for infrastructure improvements. HPUD has stated that they intend to upgrade their water treatment plant. These improvements may be financed by a variety of mechanisms. Community Facility Districts (CFD’s) or developer fees with reimbursement agreements may be used to finance these improvements. The demand for water from the Imperial Center will increase in Alternative Two from Alternative One because the Imperial Center will not be able to use recycled water for irrigation purposes. For this reason, water demand for irrigation purposes will increase by 40,186 gallons per day. Exhibit 2 provides a graphical detail of the proposed Alternative Two. Alternative Three Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-12 HPUD would provide both sewer and water services to Imperial Center in Alternative Three. The proposed infrastructure would include improvements that are included, as a full-buildout, in the Heber Public Utility District Service Area Plan. The HPUD would upgrade its water plant capacity under this alternative. This alternative would also include a looped water infrastructure system. Alternative Three is estimated to cost $2.4 million for infrastructure improvements. HPUD has stated that they intend to upgrade its infrastructure. These improvements may be financed by a variety of mechanisms. Community Facility Districts (CFD’s) or developer fees with reimbursement agreements may be used to finance these improvements. Like Alternative Two, the demand for water from the Imperial Center will increase in Alternative Two from Alternative One because the Imperial Center will not be able to use recycled water for irrigation purposes. For this reason, water demand for irrigation purposes will increase by 40,186 gallons per day. Exhibit 3 provides a graphical detail of the proposed Alternative Three. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-13 Table 8-2 Engineers Estimate for Potable Water Demand for Imperial Center Averag Usag Peak Occupanc Gallons/da e e Flow Peak y ft2/ People/U y per Gallon Hour Facto Gallon Facility Area Person nit capita s/day s r s/min Information Exhibit 15,000 ft2 30 500 10 5,000 6 3 42 Rest Rooms Wholesale Outlet Mall Restrooms, Interior Landscaping, Food 460,000 ft2 30 15,333 3 46,000 10 2 153 Service Facilities Multiplex Cinema 83,000 ft2 14 5,929 3 17,786 6 3 148 Restrooms, Food Service Hotel 200 Rooms Rooms, Laundry, Interior Landscape, 135,000 ft2 200 675 52 35,000 11 3 159 Janitorial Services, Banquet Services Hotel/Plaza Restaurant 10,000 ft2 15 667 30 20,000 12 3 83 Restrooms, Kitchen Plaza Auction Court 95,000 ft2 30 3,167 9 28,5000 6 3 238 Restrooms, Janitorial Convenience Market/Gas 37,000 ft2 30 1,233 6 7,400 12 2 21 Restroom, Kitchen, Food Service Retail Pads (eleven) 55,000 ft2 30 1833.33 10 18,333 12 2 51 Restrooms, Kitchens Total of all Above 29,337 178,019 895 Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-14 Water Assessment and Availability This section of the Specific Plan will address the availability of potable water to service the proposed development. The County of Imperial has conducted a Water Assessment to satisfy the conditions of Senate Bill 610. This section of the Specific Plan will provide a summary of this assessment. As discussed above in Alternative One, this Specific Plan calls for the potential construction of a water plant to treat the raw water that is supplied to this development. The Imperial Irrigation District would supply raw water to the water plant that the Heber Public Utility District will operate. Alternative Two and Three propose that the Imperial Center receive treated water from HPUD. HPUD has recently received a written contract that will ensure that it will receive raw water for its urban uses into the future. The contract is included as an exhibit in the County’s Water Assessment. The 2000 Imperial Irrigation District Urban Water Management Plan is included in this document as an appendix. The document analyzes the both historical and projected water use within Imperial Valley and its surrounding service area. The Urban Water Management Plan states: “For the purposes of this report and compliance with the Urban Water Planning Act, three years were selected to estimate a minimum annual water supply. The selected three years are 2001, 2002, and 2003. If during the years 2001, 2002, and 2003 there were a minimum water volume supply from the Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-15 Colorado River, it would be 3.1 million acre- feet according to a voluntary self imposed cap proposed in the QSA. Under a worst case water supply scenario the Imperial Irrigation District is confident that urban water users (which comprise less than two percent of its annual water deliveries) can be assured delivery of their required water supply. Due to its present perfected water rights and the relatively small water demand of non-agricultural water users, the Imperial Irrigation District would not reduce or cut back urban water deliveries even in years of reduced deliveries. Since its inception in 1911, the Imperial Irrigation District has never been denied the right to divert the amount of water it has requested for agricultural purposes and other beneficial uses.” The Plan states that even under the “multiple reduced demand years” where water is restricted, urban water deliveries will not be reduced. The most recent “multiple reduced demand years” were 1991-1993. Table 8-4, from the Urban Water Management Plan, illustrates that even during these years, water supply was significantly greater than water demand. Table 8-3 Imperial Irrigation District Annual Water Supply Reliability Multiple Reduced Demand Water Years Average/Normal Single Reduced Year 1 Year 2 Year 3 Water Demand Water Year (1991) (1992) (1993) Year (1995) (1992) Water Use 3,070,582 2,572,659 2,898,963 2,572,659 2,772,148 Water Supply 3,373,233 3,463,992 3,375,173 3,463,992 3,457,909 Unit of Measure is Acre-Feet Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-16 As stated in Table 8-3 above, the expected water consumption of the Specific Plan Area is 178,019 average gallons/day. This water usage is well below the Specific Plan Areas approximate historical water usage, as provided by IID. It is the intention of this Specific Plan and the County of Imperial’s Water Assessment to provide assurance that this development will have water available for its needs. The amount of water that IID has available for consumption by new urban development, as detailed in the Urban Water Management Plan, and the ability of the water plant operator to contract for this water sufficiently demonstrates the availability of water for this development. STORM DRAIN Proposed Drainage System The County will require drainage facilities to be installed as development proceeds. Drainage facilities within the study area will include the following: • Street improvements will include curb and gutter to convey surface flows in an orderly and easily maintained manner. • Catch basins and underground storm drains will be installed to convey flows as the street capacities are exceeded. • Detention basin(s) will be constructed to control the developed run off, help mitigate downstream drainage problems, and replenish ground water supplies. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-17 The County Public Works Department will determine the materials, standards and specifications for the proposed drainage system. Storm Water Retention The primary storm water retention basin will be completed prior to 40% of the complex being issued any occupancy permits. Temporary basins will be constructed to accommodate the needs for the early phases of construction activity. The primary storm water retention basin will also serve as park and open space area for the community. The size of basins will be determined at the subdivision process. Storm water retention shall be the responsibility of a property owners’ association. EXISTING PUBLIC SERVICES This section reviews the existing public services, such as police, fire, medical and solid waste services that currently exist. 1. Police Protection This site being in the unincorporated portions of Imperial County is dependent on police protection from the Imperial County Sheriffs Department. In extreme emergency or as a back up to the Sheriff other law enforcement divisions do provide an "as needed" service. This includes the City of Calexico, and the Highway Patrol, etc. 2. Fire Protection Fire protection for this area is provided by the Imperial County Fire Department, whose secondary station is located in the town site of Heber. 3. Medical Services Medical (emergency) services for this site are currently provided by an independent ambulance provider in conjunction with two hospitals. The El Centro Regional Medical Center and the Brawley Pioneers Hospital are the two primary care facilities. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-18 There are also a number of private physician offices and urgent care centers available within the City of Calexico and the City of El Centro. 4. Solid Waste Disposal Solid waste to this project site is currently not required as no on site uses exist that would demand such service. Currently residents within the Town site of Heber are offered two options to dispose of their solid waste. For a land use fee, residents can put their solid waste at the curb for pick up by Environmental Services whose site is located at Dogwood and Robinson Road or they can use the Imperial County Landfill. 5. Property Owners’ Association An Association of Property Owners shall be formed in order to ensure that the requirements and standards of this Specific Plan shall be implemented and in order to provide and maintain common signage, parking, walkways and landscaping. This Association of Property Owners shall be established as a deed restriction for each subdivided property within this project. EXISTING PUBLIC UTILITIES This section discusses the existing public facilities at the site such as electricity, phone, and other public utilities that are located on the project area. 1. Electricity The Imperial Irrigation District currently supplies most of Imperial County, with the exception of the northeastern portion with electrical energy. As there are no significant improvements on this site at this time, no service has been provided, however the Imperial Irrigation District's facilities encroach through the site. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-19 2. Gas There is no natural gas system available to the site at this time as the nearest location of a natural gas main is located at State Highway 111 and Chick Road. 3. Telecommunications Telecommunications are provided by a variety of suppliers in this County, including but not limited to Pac Bell. However at this time while the site would have access to such a service, there is no service being provided to this particular site. SCHOOLS The Imperial Center Specific Plan is located within the Heber School District, which provides elementary, middle and high school education for students in grades K-8. Central Union High School District in El Centro provides for 9-12 education. The Imperial Center Specific Plan applies specifically to the area stated in this plan. In the event that the Imperial Center Specific Plan does not address specific policy or regulatory information, then the County’s zoning, subdivision and other local ordinances shall apply. The following table summaries the existing site. Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-20 Table 8-4 Summary of Existing Facilities Existing Location Type of Classification Facility Service/ID 1. Land Use Project A-2 Agriculture area 2. Overlay Project Urban Area Heber Specific Zone area Plan Area 3. Other Project Utility Heber Utility designations area Service Area 4. Arbatti East of N/a Local County Road Hwy 111 Road 5. Yourman Between LOS A to B Local County Road Arbatti Road Road and Heber Road 6. Heber Road East of LOS C to D Minor Arterial Hwy 111 7. State West of LOS C State Highway Highway 86 the project area 8. State South of N/a 4-lane State Highway Arbatti Highway 111 Road and north of Heber Road 9. Interstate 8 3 miles N/a Federal Highway north 10 Airport Calexico N/a N/a 11 Transit None N/a Bus Route 12 Bicycle None N/a N/a 13 Pedestrian None N/a N/a 14 Sewer None N/a N/a 15 Water Yes Agricultural Irrigation 16 Drainage Adler Agricultural Open earth Drain runoff channel Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-21 Table 8-4 Summary of Existing Facilities Existing Location Type of Classification Facility Service/ID 17 Geology Entire N/a SaltonTrough project area 18 Soils Entire N/a Holtville Soil project area 19 Biology Entire N/a To be determined project area 20 Parks and Project N/a N/a Recreation area 21 Police Project Police N/a area 22 Fire Project Fire N/a Protection area protection 23 Medical Project Medical N/a Services area 24 Solid waste None N/a 25 Electricity Easement Electrical N/a 26 Gas N/a N/a N/a 27 Telecomm- N/a N/a N/a unications 28 School N/a N/a N/a Table 8-5 Proposed Right-of-Way (R/W) Existing Existing Proposed Proposed Facility R/W R/W Classification 1. Abatti 60 Feet 84 Feet Major Collector Road 2. Yourman 60 Feet 84 Feet Major Collector Road 3. Heber 84 Feet 126 Feet Prime Arterial Road Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-22 Figure 8-B – Sewer & Water System Plan – Alternative One Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-23 Figure 8-C – Sewer & Water System – Alternative Two Imperial Center Specific Plan May 2, 2006 (cid:132) Page 8-24