LAFCO
Scsd Service Area Plan
Read the report at Local Agency Formation Commissions ↗
Salton Community Services District
Service Area Plan
July 2021
RICK Engineering Company
Revised September 2023
Contents
EXECUTIVE SUMMARY ...................................................................................................................................... 1
Population Projections ............................................................................................................................. 1
Public Facilities Analysis ........................................................................................................................... 2
1. INTRODUCTION ...................................................................................................................................... 12
Background on the Salton Community Services District ...................................................................... 12
Purpose of the Service Area Plan ........................................................................................................... 12
2. GROWTH AND PHASING PROJECTIONS ..................................................................................................... 17
Introduction ............................................................................................................................................ 17
Projected Population.............................................................................................................................. 17
Areas of Annexation ............................................................................................................................... 18
Existing Land Use .................................................................................................................................... 18
Planned Land Use ................................................................................................................................... 19
3.0 Public Facilities and Services ................................................................................................................ 25
Introduction ............................................................................................................................................ 25
3.1 ADMINISTRATIVE FACILITIES ....................................................................................................................... 25
Performance Standard ........................................................................................................................... 25
Facility Planning and Adequacy Analysis ............................................................................................... 25
Funding ................................................................................................................................................... 29
Mitigation ............................................................................................................................................... 30
3.2 WASTEWATER FACILITIES ......................................................................................................................... 31
Introduction ............................................................................................................................................ 31
Performance Standard ........................................................................................................................... 31
Facility Planning and Adequacy Analysis ............................................................................................... 31
Funding ................................................................................................................................................... 40
Mitigation ............................................................................................................................................... 43
3.3 FIRE FACILITIES ........................................................................................................................................ 45
Introduction ............................................................................................................................................ 45
Performance Standard ........................................................................................................................... 45
Facility Planning and Adequacy Analysis ............................................................................................... 46
Funding ................................................................................................................................................... 47
Mitigation ............................................................................................................................................... 47
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
i
3.4 PARK AND RECREATIONAL FACILITIES ........................................................................................................ 48
Introduction ............................................................................................................................................ 48
Performance Standard ........................................................................................................................... 48
Facility Planning and Adequacy Analysis ............................................................................................... 48
Funding ................................................................................................................................................... 51
Mitigation ............................................................................................................................................... 53
3.5 SANITATION AND SOLID WASTE DISPOSAL ................................................................................................ 54
Introduction ............................................................................................................................................ 54
Performance Standard ........................................................................................................................... 54
Facility Planning and Adequacy Analysis ............................................................................................... 54
Funding ................................................................................................................................................... 56
4. FINANCING ............................................................................................................................................. 57
Introduction ............................................................................................................................................ 57
Financing Opportunities and Constraints .............................................................................................. 57
Facility Financing .................................................................................................................................... 64
5. AVAILABILITY OF SERVICES NOT PROVIDED BY THE DISTRICT ............................................................. 68
Introduction ............................................................................................................................................ 68
Law Enforcement .................................................................................................................................... 68
Water Services ........................................................................................................................................ 68
Electricity ................................................................................................................................................ 69
Coachella Valley School District ............................................................................................................. 69
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
ii
EXECUTIVE SUMMARY
This Service Area Plan (SAP) is prepared for the Salton Community Services District (District). The purpose of
the SAP is to provide the Imperial County Local Agency Formation Commission (LAFCO) with enough
information to demonstrate that future public facilities have been identified and will be available to serve the
future development within the Sphere of Influence (SOI) in accordance with the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000. This document complies with the requirements of Section 56653(b)
regarding the preparation of a plan for providing services (Service Area Plan) and provides the information
necessary for LAFCO to conduct a municipal services review in compliance with Section 56430.
The following definitions will be helpful in understanding this executive summary:
Population Projections: Population projections provide the anticipated population in five year increments up
to the year 2040. A four-year increment exists between the current year 2021 and 2025.
Performance Standard: A performance standard is the desired level of service that a public facility must
provide.
Facility Analysis: The facility analysis determines the existing and future impacts or demands of public
facilities.
Population Projections
Salton City Desert Shores Estimated/Projected
Year
Population Population Total Population
2021 4,557 1,750 6,307
2025 4,780 1,836 6,616
2030 5,073 1,948 7,021
2035 5,385 2,068 7,453
2040 5,716 2,195 7,911
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
1
Public Facilities Analysis
Administrative Facilities
Performance Standard: The district currently has no formal performance standard for
administrative facilities. The district anticipates that 1,300 square feet of
administrative facilities per 1,000 population reflects District demand.
Existing Facilities: Administrative Office: 7,640 sq. ft.
Service Garage with Storage: 2,500 sq. ft.
Storage Building with Office: 900 sq. ft.
TOTAL: 11,040 sq. ft.
Existing Demand: 8,199 sq. ft.
Adequacy: Building Square Footage
Existing = 11,040
Demand = 8,199
Surplus = 2,841
Future Demand: The district is on track to meet the projected facilities square footage
demand of approximately 10,285 sq. ft. of Administrative Facilities by 2040.
Mitigation: Continue to periodically review the administrative facilities and personnel
of the district through the preparation of annual reports. Such review will
identify staffing and budgetary concerns as District growth continues to
increase the demand on facilities and staff.
Develop a long-term street lighting and landscaping plan.
Maintain agreements and Memorandums of Understanding (MOUs) with
the County to continue providing space for County activities, departments,
and programs.
Performance of a formal building structural inspection to identify necessary
repairs for construction and associated costs to be incurred by the district
to continue administrative activities.
Engage and hire a qualified and experienced professional to take over the
role of District General Manager. Maintain the IGM and existing staff for as
long as possible to provide a smooth transition to the upcoming General
Manager.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
2
Funding Sources: General fund – property taxes from the County, interest income on
accounts, charges for services, and other miscellaneous sources. Rental
income from cellular tower facilities and from the Burrtec waste contract
agreement also funds the administrative facilities.
Proposed Budget N/A
(2022/2023):
Cost Per Capita: N/A*
*Note: The District does not maintain a separate budget line item pertaining
to Administrative Facilities. Instead, Sewer Maintenance Funds (SM) pay for
and fund all items associated with the district office building. Property taxes
are not used to fund the district office building. Instead, the District office
building is funded by sewer user fees and rental income.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
3
Wastewater Treatment and Sewer Facility Capability
Performance Standard: 85 percent capacity at peak flow
Existing Facilities: Desert Shores:
Evaporation and Percolation Ponds
Seven Ponds
Maximum capacity of 200,000 GPD (SCSD, 2016)
25 miles of sewer lines
Thomas Ramon Cannell (TRC):
Evaporation and Percolation Ponds
11 ponds
Maximum capacity of 185,000 GPD (SCSD, 2016)
430 miles of sewer lines
Lansing:
Evaporation and Percolation Ponds
Five Ponds
Maximum capacity 120,000 GPD (SCSD, 2016)
Shares 430 miles of sewer lines with TRC
Existing Demand: 9 Personnel
Adequacy: 6,307 Existing Population x 1.45 personnel / 1,000 Population = 9
personnel demanded – meets performance standard
Future Demand: The district will update the wastewater master plan and continue to work
with the Regional Water Board on plans to expand wastewater facilities
as the TRC and Lansing Facilities reach capacity.
Also, the district will apply for a planning study grant through the State
Water Resources Control Board to evaluate the capacities of the
wastewater treatment facilities (WWTFs).
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
4
Mitigation: Continue to periodically review the wastewater rate and financing
structure to ensure adequate funding for the implementation of new
projects and the maintenance of existing facilities. The Salton Community
Services District Wastewater Rate Study recommended an increase in
sewer rates of 30 percent In June 2024 and incremental increases of 4
percent in the subsequent four years to ensure the system is financially
viable. This study was updated in January 2023. Per Prop 218
requirements, the user rate increases were brought to the community for
a vote in July 2023 and were ultimately adopted by the district.
Establish District goals in terms of Biological Oxygen Demand (BOD) and
total suspended solids (TSS) levels and continue to monitor activities at all
three Wastewater Facilities. Implement best management practices
(BMPs) for wastewater treatment to minimize pollutants and protect
water quality.
Prior to the recordation of a Final Map for a development project proposed
within the District Sphere of Influence, the District shall require a
development agreement enforced by the County Land Use Ordinance,
indicating that adequate wastewater service would be available to the
completed project.
To meet the wastewater treatment needs of the existing population in
Salton City, the District will construct an expandable ponding system per
the design and specification requirements of a qualified engineering firm.
Phase 1 for expanding the wastewater treatment needs include updating
the TRC facility to a rated capacity of 1 MGPD and phase 2 would expand
capacity to 3 MGPD to accommodate future District demand.
The district will also complete the following tasks to assure the Wastewater
System is in compliance with local, state and federal regulations.
Implement a robust monitoring and reporting system complying with
LAFCO guidelines to track the progress and effectiveness of mitigation
measures. Regularly communicate findings and updates to the public and
relevant authorities based on the requirements set forth in LAFCO’s Staff
Report for the District. Adhere to all direction from LAFCO throughout
probationary status.
Release bid packages and secure construction contracts to proceed with
the selected alternative. Obtain necessary permits and provide required
notifications to agencies to receive authorization for completing the
improvements.
Conduct biological and cultural resource studies to address the federal
crosscutter requirements of the federal Clean Water State Revolving
Funding program.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
5
With the assistance from RCAC, develop a Clean Water State Revolving
Fund (CWSRF) Planning Application to fund the Selected Construction
Project and promptly execute the bidder selection process to complete the
improvements.
Prepare detailed system maps of the sewer system, drainage basins,
hydraulic models, or record drawings (as-builts) as required as part of the
Sewer System Management Plan (SSMP) mandated by the Regional Water
Quality Control Board.
Apply for a separate planning grant through the State Water Resources
Control Board to evaluate the capacities of the WWTFs.
Funding Sources: The primary sources of revenue for wastewater treatment and collection
facilities (including sewer maintenance) are yearly sewer user fees,
sewered lot standby fees, and administration fees transferred from the
General Fund.
Proposed Budget $4,202,144.00 costs
(2023/2024):
Cost Per Capita: $672.34
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
6
Fire Facilities
Performance Standard: The district no longer provides fire protection/emergency medical
services to the Service Area. All fire personnel are currently staffed by the
County of Imperial Fire Department.
Historically, the County has agreed to the following:
An 8 minute to site and a 3-minute out the door performance goal.
690 ft2 per 1,000 population performance standard for fire facilities.
A 2.17 per 1,000 population performance standards for fire personnel.
Existing Facilities: Stations:
Imperial County Fire Station #9 is located at the Imperial County Road
District #3 Satellite Road Yard at 2256 West Cleveland Ave. Salton City, CA
92275. The County currently uses a mobile home structure for personnel
and utilizes the yard to hold emergency vehicles.
Personnel:
The District no longer provides fire protection/emergency medical
services to the Service Area. Currently, all personnel are provided by the
County of Imperial Fire Department.
Equipment:
• 2 Fire Trucks
• 1 Ambulance (owned and operated by AMR)
• 2 Defibrillators
Existing Demand: 4,352 sq. ft. of fire facility building space and 14 personnel.
Adequacy: Building Square Footage
Existing = 1,564
Demand = 4,352
Deficit = 2,788
Personnel
Existing = 0
Demand = 14
Deficit = 14
Future Demand: To meet the projected fire facilities square footage demand the County
Fire Department will need approximately an additional 5,459 sq. ft. of Fire
Facilities by 2040 and 17 fire personnel.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
7
Mitigation: Support the County’s fire protection services through continued use of
the District’s facilities, vehicles, and protective equipment.
Funding Sources: General fund. Note – The 2022-23 budget for fire reflects minimal
expenses such as building and grounds expenses and does not include
equipment, as the County is providing fire protection services to the
Service Area.
Proposed Budget $8,630
(2022/2023):
Cost Per Capita: $1.37
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
8
Park and Recreational Facilities
Performance Standard: The District currently has no formal performance standards with regards
to parks and recreational facilities. However, historically the District
utilized a 5.0 acres per 1,000 population performance standard to reflect
District demand.
Existing Facilities: Park Acres Owned:
Salton City Community Park = 10.5 acres
Desert Shores Park = 4.59 acres
Undeveloped (possible) park/open space properties = 102.37 acres
TOTAL = 15.09 acres of developed park facilities and 117.46 acres of
possible park space
Existing Demand: 32 acres
Adequacy: Parkland Acreage:
Existing = 15.09
Demand = 32
TOTAL = 16.91 acre deficit
Future Demand: The District is not on track to meet the projected required demand of 40
acres of parkland by 2040 (based upon population projections).
Mitigation: Leverage State and County grants to perform capital improvement projects
in the Salton City Community Park and Desert Shores Community Park.
Ensure compliance with grant funding requirements and meet the
standards necessary for expenditures and reimbursements.
Due to inconsistent funding, it is recommended the District investigate the
process of relinquishing all responsibilities for Parks and Recreation to the
County of Imperial or define a reoccurring funding source.
Require developers of new residential developments to dedicate parkland
and/or pay development impact fees for the improvement and expansion
of existing park and recreational facilities.
Develop a maintenance and improvement plan for all park and recreational
facilities within the District taking into consideration the results of the
questionnaire distributed by the Community Recreation Complex
Commission.
Funding Sources: The only Parks and Recreation funding for the district for the 2022-23 fiscal
year is from a grant of $377,000 from an outside source to fund
improvements in the two parks within the District.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
9
Annual Budget $N/A
(2022/2023):
Cost Per Capita: $N/A
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
10
Solid Waste Disposal/Sanitation
Performance Standard: The California Integrated Waste Management Board (IWMB) sets a waste
diversion rate goal of 50 percent.
The Imperial County Waste Management Plan requires the landfill that
services the area to have a minimum 15-year capacity.
Existing Facilities: The District maintains a contract with Burrtec which ensures the adequacy
of existing solid waste disposal facilities and services.
In addition to the existing contract, the Salton City landfill services all
residents of Imperial County, including District residents.
Adequacy: The District’s contract with Burrtec ensures adequacy of solid waste
disposal facilities and services. The Salton City landfill has a 50- year
planning capacity. Imperial County, which is inclusive of the District, meets
the waste diversion goal set forth by the IWMB.
Future Demand: As the District continues to grow, so does the need for solid waste disposal
services and facilities. The original ten-year franchise agreement with
Burrtec from 2009 was amended as of December 2019 to include collection
services for residents on the Imperial County Tax Roll. The Salton City
Landfill has a closure date in excess of 50 years. This site will suffice for
District needs now and into the future.
Mitigation: Study the long-term implications of mandatory trash collection pick-up and
the implication of in-house trash collection.
Funding Sources: Burrtec and the District agreed to place all District Residents on the
Imperial County Tax Roll for Solid Waste and Recycling Services, with the
option to “opt-out” for direct billing or perform Self-Hauling. Direct costs
billed to end users at rates determined by Burrtec. Each year, rates are
assessed by Burrtec based on operating costs and are defined in the
annual renewal agreement negotiated by the District. The District takes
5% of the annual revenue for administering the solid waste services.
Annual Budget $N/A
(2022/2023):
Cost Per Capita: Effective 2021 residential rates average $75.15 per 3 months of service.
Commercial rates are conditional on the frequency of collection and
container size.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
11
1. INTRODUCTION
Background on the Salton Community Services District
The Salton Community Services District (District) lies on the west side of the Salton Sea within Imperial
County just south of the Imperial-Riverside county line (see Figure 1). The District encompasses
unincorporated land that includes the communities of Salton City and Desert Shores. In 1955 Desert
Shores Community Services District was chartered by the State of California. In 1957 M Phillips and Holly
Corporation of Dallas, Texas began development of Salton City and needed a method to control services.
Rather than going through the legislative process of forming a governing agency, they annexed a section
of land along the shoreline by tangent comers south to Salton City from the Desert Shores Community
Services District. The Desert Shores Community District was renamed the Salton Community Services
District in 1957 as authorized by the Secretary of the State of California. Figure 2-2 provides the existing
District boundary.
The Salton City area was divided into 86 subdivided tracts. Each of these tracts were allotted to
individual development companies after the individual tract maps were Certified and Stamped
approved by Imperial County as final. As each lot was surveyed and graded the developer of each lot
paid into a District fund for water and sewer. As the streets were developed they were deeded to
Imperial County. In 1985, per Chapter 59 Statues 1985, enforcement of the Covenants Condition and
Restriction of all 86 tracts within the District was granted to the District. The District today includes
Desert Shores, the connecting tract of land, and Salton City, which includes portions of land east of State
Highway 86 (see Figure2).
The District includes approximately 20,480 acres. The District maintains a Sphere of Influence (SOI) with
the Imperial County Local Agency Formation Commission (LAFCO) that extends from the Riverside
County line south to Highway 78, and from the Salton Sea to the San Diego County line (see Figure 2
below).
Purpose of the Service Area Plan
This Service Area Plan (SAP) has been prepared for the District in accordance with the Cortese-Knox-
Hertzberg Local Government Reorganization Act of 2000, which requires that such a plan identifying the
existing and projected demand for public facilities and services be prepared by all incorporated cities
and Special Districts within the State of California (State). The 2000 legislation is specifically
implemented by LAFCO, whose policy states that an SAP must be implemented by a District in order for
any formal annexation of land into that District's boundaries to take place.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
12
Organization and Use of the Service Area Plan
The SAP outlines the district’s existing public services and facilities, estimates the current and future
anticipated demand for such facilities and services, and describes how necessary facilities and services
will be or may be developed and extended to meet projected demands.
The SAP is intended to demonstrate the district’s intent and ability to provide adequate services within
its boundaries. An approximately 20-year planning horizon is used to forecast growth, and the estimated
demands and provision to meet demands are based on population projections in five-year increments
through 2040. A four-year increment exists between the current year (2021) and 2025.
The population projections used in this document are based on information provided by the Salton
Community Services district and a review of historical and anticipated population growth rates in
various communities in northern Imperial County.
The document is organized into the following sections that satisfy the requirements set forth in the
LAFCO guidelines.
Executive Summary: Provides a brief summary of the SAP, highlighting key information regarding
demand and financing.
Chapter 1.0 Introduction: Outlines the purpose and intent of the SAP and presents the layout of the
SAP to help the reader use the document. This chapter also provides background information on the
district and the planning documents that enabled the preparation of the SAP.
Chapter 2.0 Growth and Projections: Provides general information about projected population, current
and future land use trends in the District and the District's SOI, and the implications of these trends for
the development of District services and facilities.
Chapter 3.0 Facilities and Services: Details the current and planned facilities and services, their current
and projected adequacy, measures to ensure adequacy, and how such measures will be achieved and
financed. An analysis of the following facilities and services is provided:
3.1 Administrative Facilities
3.2 Wastewater Treatment and Sewer Facilities
3.3 Fire Facilities
3.4 Park and Recreational Facilities
3.5 Sanitation / Solid Waste
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
13
The analysis within the SAP of each public service is based on the standards developed by LAFCO. Each
subchapter of Chapter 3 contains the following four sections:
• Performance Standard: A description of any standards or goals that have been
adopted by the district to review the adequacy of service within the existing and
future timeframes.
• Facility Planning and Adequacy Analysis: An inventory of the existing facilities, the
adequacy of the facilities when compared to existing demands, the anticipated
demand for facilities pursuant to growth of the district, and the phasing of the
demand for facilities.
• Financing: An explanation and identification of how services and facilities are
currently being funded, including a per capita cost, and how future services and
facilities may be funded.
• Mitigation: A series of recommendations to ensure that adequate facilities will be
provided and that proper levels of service will be maintained.
Chapter 4.0 Financing: Identifies all of the potential funding mechanisms for public services and facilities
provision that are available to the district. This section presents potential funding sources and then
identifies how each service or facility sector is currently funded. It outlines appropriate future funding
opportunities as well as cost saving opportunities.
Chapter 5.0 Services Not Provided by the District: Provides an overview of services not provided by the
district such as schools, electricity, and water.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
14
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
15
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
16
2. GROWTH AND PHASING PROJECTIONS
Introduction
The phasing projections section provides an estimate for where and when development will occur
within the district, including where annexation would extend the district’s boundaries. Although phasing
projections are difficult to predict with precision, they are beneficial to the process of planning of public
facilities to ensure level of service standards are continually met.
The district includes approximately 20,480 acres with vacant lots located throughout the district. A large
amount of developable land exists within the district boundaries.
Projected Population
Population projections are based on information provided by the Salton Community Services District
and a review of historical and anticipated population growth rates in various communities in northern
Imperial County. The population within the district is condensed mainly within the unincorporated
communities of Salton City, Salton Sea Beach, and Desert Shores. The 2010 U.S. Census reported a
population of 3,763 in Salton City, 422 in Salton Sea Beach, and 1,104 in Desert Shores. Estimates from
ESRI Business Solutions (ESRI), a national database that conducts estimates of demographic information
for geographies nationwide, indicate that in 2020 Salton City had a population of 4,107 and Salton Sea
Beach had a population of 450. The district indicates that the Desert Shores area has experienced
population growth that is not registering on Census data (or related databases such as ESRI), as many
new residents in Desert Shores are undocumented. The district estimates that the current population
of Desert Shores is between 1,500 and 2,000 residents, and the population estimates assume a 2020
population of 1,750 residents in Desert Shores.
The population projections assume an average annual population growth rate of 1.2 percent for the
various areas within the district, based upon research of projections for population provided by the
California Department of Transportation (Caltrans)1 and the Southern California Association of
Governments (SCAG)2. Caltrans projections anticipate an average population rate of growth of 1.4
percent for the unincorporated areas within Imperial County, between 2020 and 2035. Caltrans projects
an annual population growth rate of 1.0 percent for Imperial County (overall) between 2020 and 2035,
and 1.07 percent for the nearest city to the District, the City of Brawley, between 2020 and 2035. SCAG’s
most recent population projections for Imperial County anticipate a county-wide annual population
growth rate of 1.2 percent between 2020 and 2035, as the area continues to attract residents working
1 California County Level Economic Forecast 2017 – 2050, California Department of Transportation, September
2017.
2 2016 – 2040 Regional Transportation Plan Final Growth Forecast by Jurisdiction, Southern California
Association of Governments.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
17
in agricultural zones within the County as well as residents seeking more affordable housing, compared
to the rest of Southern California.
The population projections, outlined as follows, assume an annual population growth rate of 1.2
percent, in line with SCAG’s projections for Imperial County for the next 15 years, and representing a
mid-range between projections made by CalTrans for unincorporated areas of Imperial County, versus
the overall County of Imperial, for the next 15 years.
Over the years, various local and state agencies have developed and begun executing a number of plans
and studies to revitalize the Salton Sea area, including the Salton Sea Master Development Plan and the
Salton Sea Habitat Enhancement Project, launched by the California Department of Water Resources.
In addition, various companies and organizations have considered the Salton Sea area for the mining of
natural resources needed for renewable energy storage and for the production of legal cannabis. While
the District is aware of such plans, which could attract additional population and investment to the
region if implemented, the implementation timelines for various rehabilitation and revitalization efforts
and business ventures in the Salton Sea area remain uncertain. The population projections in this SAP
were created independent of any other studies or plans at the local or regional levels and as noted,
draw primarily from regional growth projections for the Imperial County area.
Salton City Desert Shores Estimated/Projected
Year
Population Population Total Population
2021 4,557 1,750 6,307
2025 4,780 1,836 6,616
2030 5,073 1,948 7,021
2035 5,385 2,068 7,453
2040 5,716 2,195 7,911
Areas of Annexation
There are no current or pending areas of annexation within the District boundaries at the time this SAP
was drafted, and no annexations have occurred since the previous (2006) SAP was published.
Existing Land Use
The County of Imperial has land use authority over the District. Existing land use in the District is guided
by the West Shores / Salton City Urban Area Plan, which is incorporated to and implements the Land
Use Element of the Imperial County General Plan. The District is located within the West Shores / Salton
City Urban Area, which encompasses nearly 32,000 acres and includes the community of Salton City,
the beach resorts of Vista Del Mar, Salton Sea Beach, and Desert Shores, and the proposed Habitat 2000
Specific Plan Area. The West Shores / Salton City Urban Area (Urban Area) is generally bound by the
Riverside County line on the north, the Salton Sea on the east, the Navy’s Salton Sea Test Base on the
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
18
south, and State Highway 86 on the west, except for portions of Salton City which extend west of
Highway 86. Portions of the Torres-Martinez Indian Reservation are located in the northern part of the
Urban Area. The Land Use Element of the County’s General Plan indicates that Urban Areas will
eventually be annexed or incorporated and should be provided with the full range of public
infrastructure normally associated with cities. The General Plan indicates that any new development in
Urban Areas shall provide for the extension or development of full urban services such as public sewer
and water, drainage improvements, streetlights, fire hydrants, fully improved paved streets with curbs
and, in many cases, sidewalks. Improvements shall be consistent with the County’s development
standards. Urban Areas may include a broad range of residential, commercial, and industrial uses.
Existing land uses in the District are governed by the provisions of the Imperial County Zoning Ordinance
and are guided by the goals and policies presented in the County’s Land Use Element of the General
Plan and Urban Area Plan. By implementing the language from these documents, the District dictates
the types of land uses that are allowed in specific areas within its boundaries. The West Shores / Salton
City Urban Area Plan lists the following land use zones for Salton City and Desert Shores: Agriculture (A-
1), Low Density Residential, Medium Density Residential, High Density Residential, Neighborhood
Commercial, General Commercial, Light Industrial, Medium Industrial, and F (Recreation Zone). Figures
3 and 4, below, show the zoning for Desert Shores and Salton City derived from the Imperial County
General Plan and Figures 5 and 6 detail the General Plan’s guidance for land use and zoning in the Sphere
of Influence. Figure 7 outlines the Salton City Airport land use compatibility zones.
The West Shore economy is based on employment in the various agricultural operations in Imperial
County, as well as employment in retail and hospitality, serving local residents as well as highway
travelers and seasonal visitors to the area. In the event there is a significant clean-up or rehabilitation
of the Salton Sea, making the region more attractive to residents and recreational visitors, the economic
development prospects of the District may improve significantly. In addition, investment in renewable
energy industries as well as the cannabis industry may continue to support economic growth in this part
of Imperial County.
Planned Land Use
Planning and development within the District boundaries is guided by the goals and policies of the
General Plan Land Use Element of the County of Imperial, the West Shores / Salton City Urban Area
Plan, and other General Plan elements. Through the implementation of these elements / plans and the
application of the land use designations detailed above, the District is generally able to foresee where
and to what extent growth will occur within its boundaries.
The SAP assumes that all of the land within the District’s Sphere of Influence will one day be annexed
into the District. The General Plan does not provide a schedule for annexation of land to the District.
Approved, Planned, and Proposed Development:
At the time this SAP has been drafted (2021), there are no proposed, pending, or planned developments
within the Desert Shores or Salton City communities.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
19
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
20
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
21
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
22
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
23
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
24
3.0 PUBLIC FACILITIES AND SERVICES
Introduction
The following chapter provides a detailed account of the various public services and facilities that are
maintained and operated by the Salton Community Services District (District). This chapter discusses
and evaluates administration, wastewater facilities, fire protection, recreational facilities, and solid
waste services functions of the District. For each of these areas, an inventory of existing facilities is
provided, and where applicable, performance standards are identified to gauge the effectiveness and
adequacy of the facilities and services. The demands for future facilities and services are discussed
relative to the projections for population growth outlined in Chapter 2. Where applicable, this chapter
discusses plans for future facilities and services. This chapter outlines the current funding methods for
each service area and the prospective sources of funding that could be used in the future. Finally, this
chapter presents mitigation measures that would aid the District in ensuring future adequacy and
efficiency of public facilities and services.
3.1 ADMINISTRATIVE FACILITIES
Performance Standard
There are no existing performance standards
for administrative facilities for the Salton
Community Services District. However, the
District has indicated that the current facilities,
encompassing 11,040 square feet of space, are
sufficient to serve the existing population of
6,307 residents and provide room to
accommodate population growth. Therefore, a
performance standard of 1,300 square feet of
administrative facilities per 1,000 residents
may be applied. Photo of District office sign
Facility Planning and Adequacy Analysis
This analysis provides an inventory of the existing District administrative facilities owned by the District,
the existing and future demand for facilities as well as a projected phasing schedule. The purpose of this
analysis is to determine whether the existing facilities are adequate and to identify approximately when
additional facilities will be needed in order to meet future demand.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
25
Inventory of Existing Facilities:
Administrative Office 7,640 sq. ft.
Service Garage with Storage 2,500 sq. ft.
Storage Building 900 sq. ft.
TOTAL 11,040 sq. ft.
The one-story administrative office was built in
2007 and purchased by the District in 2014. The
new district administrative office building was
purchased to provide adequate office space for
administrative staff, to provide a dedicated
board room to hold district board/committee
meetings, to provide storage space for district
record retention, and space to provide
community services such as housing the
Imperial County Free Library, as shown in the
photo to the right. The old district office building
was not adequate in providing enough office
space, storage space, along with not having a
dedicated board room to hold district meetings. Photo of Library entrance located on the south side of the District office
The administrative office space is located off Service Road and Van Buren Street at 1209 Van Buren
Street, Salton City, CA. The garage and storage facilities are located at 2194 and 2196 Cleveland Avenue,
Salton City, CA.
The administrative office is currently staffed by the District’s Interim General Manager, Assistant
General Manager, Board Secretary, Finance Officer, Field Foreman, and Lead Man, totaling 6 full-time
office staff.
Providing services for wastewater facilities, the District currently has 9 sewer maintenance crew
members and 1 Public works staff member, totaling 10 off-site staff.
A contract exists between the District and the Imperial Irrigation District (IID) for streetlight installation
and maintenance. The District pays monthly electric fees for usage of the lights. Development within
the District over the last 40 years has been very spread out, and as a result the lighting throughout the
District is spread out as well. It is in the interest of the District to install and maintain photovoltaic
streetlights.
Adequacy of Existing Facilities:
In 2014 the District was able to upgrade the administrative office and purchase the current facility at
1209 Van Buren Street. The administrative office is now considered to be adequately sized based upon
the performance standard of 1,300 square feet of administrative facilities per 1,000 residents. As a
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
26
result of the administrative office upgrade, the Sheriff’s Station was relocated to 2101 South Marina
Drive Suite 1, Salton City.
The existing quantities of office space and meeting space are currently acceptable to accommodate the
employees, customers, and users of the District administrative facilities. The current square footage of
administrative office space also allows for the continued accommodations of the adjacent library,
located on the south side of the District office. Additionally, District staff has determined that the square
footage of their existing service garage and storage is adequate.
The administrative office facilities currently withstand existing structural problems, demonstrated by
damage visible within the District office. The District consulted with foundation contractor, Ram Jack
Pacific, to assess the structural problems and provide a quote for repair and remediation. Upon
performance of an informal manometer survey to assess elevation differences throughout the building,
the contractor determined that the building requires additional inspection to determine repair costs.
With regards to street lighting, the current layout of streetlights is very spread out across the District.
With the recent increase in development, additional intersections now require streetlight installation.
The District is considering installing photovoltaic streetlights around the District as well.
Currently, the District needs 1 Administrative Assistant to provide support for office and off-site staff
and accommodate service needs. Addition of these staff members would amount to 7 full-time District
office staff and 15 off-site District staff.
Future Demand for Facilities:
As the Salton Community Service District continues to grow, so does the need for administrative
facilities. With a population expected to reach 7,911 by the year 2040, it is projected that the current
administrative facilities will be adequate to serve future residents. Application of the District's future
performance standard suggests that 10,285 square feet of administrative facilities may be needed to
adequately serve the projected 2040 population.
Applying the recommended performance standard to population projections, the District will require
the following square footage of administrative facilities in the coming years.
Salton City Desert Shores Estimated/Projected
Year
Population Population Total Population
2021 4,557 1,750 6,307
2025 4,780 1,836 6,616
2030 5,073 1,948 7,021
2035 5,385 2,068 7,453
2040 5,716 2,195 7,911
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
27
The District is responsible for implementing a fully functional and qualified staffing level. Recent staffing
changes have prompted a staffing transition period and the District has appointed an Interim General
Manager (IGM) to continue operating and overseeing District services. The IGM is currently in an “at
will contract” which continues at the pleasure of the Board and will remain in effect until a permanent,
qualified General Manager is appointed to the District.
The IGM has worked with the District within the Sewer Maintenance Department for 11 years and is
extremely familiar with the day-to-day operations of the sewer systems and treatment plants. Their
responsibilities within the Department have increased incrementally throughout their tenure, as
reflected by their positions held starting from Sewer Maintenance Worker I, Sewer Maintenance
Supervisor, Field Foreman until this most recent position as IGM. The IGM is highly knowledgeable about
day-to-day operations, maintenance, field crew management, Regional Water Board compliance,
budgeting and plant operations. The IGM has actively cooperated with LAFCO throughout the interim
and will lead a smooth transition for the successor in their role.
The District’s Finance Officer holds 15 years of experience managing accounting functions including
AP/AR, payroll, ensuring integrity and accuracy of internal controls. The Financial Officer maintains
financial books, prepares financial reports for month end, quarterly, and year end, prepares and files
571’s, quarterly payroll 941’s DE9-c’s, preforms advanced reviews of business operational trends,
prepares accurate forecasts, and conducts auditing. The Finance Officer has remained cooperative with
LAFCO throughout the interim and will serve as a valuable resource to the upcoming General Manager
to discuss cash flow, economic trends, existing challenges, and funding opportunities.
The District’s Board Secretary provides an advisory role on government rules and regulations for
corporations’ policies and procedures for operations. The Board Secretary holds five years of experience
as an administrative assistant performing data entry, drafting correspondence, drafting resolutions,
agendas, and scheduling meetings. The Board Secretary is vital to the District’s record keeping processes
and community public relations. Throughout the District’s remediation period, the Board Secretary will
uphold the Board’s commitment to transparency by maintaining public access to board meeting
minutes, agendas, and resolutions. The Board Secretary will also provide the District with clear guidance
on the Board’s resolutions, proceedings and action items.
The Field Foreman has worked with the District for 24 years serving in a variety of department roles
between Public Works and Sewer Maintenance. The Foreman oversees maintenance of parks, fire
stations, offices, and the public pool. The Foreman previously worked in Sewer Maintenance,
overseeing day-to-day maintenance and operations of sewer systems, now serving as Chief Plant
Operator Grade II. The Field Foreman will leverage their technical knowledge and experience to
continue operations of the sewer system while the District undergoes this staffing transitionary period.
Each District staff member plays an important role in maintaining the day-to-day operations and
services of the District during the interim, while preparing for a smooth transition for the upcoming
General Manager. They are committed to taking action to remedy the stated deficiencies of the District
and providing quality services for District community residents. They will work together to engage a
qualified and experienced professional to assume the role of District General Manager.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
28
Opportunities for Shared Facilities:
In order to reduce administrative service costs, the District rents out a portion of the administrative
offices for use by the County library. The tenant (the Imperial County Free Library) pays rent to the
District for use of the facilities.
Photovoltaic (solar) streetlights maintained by IID are another possible cost saving mechanism for the
District as well. The District upholds a Memorandum of Understanding (MOU) with the County of
Imperial to allow County programs and departments to use space in the administrative building to
provide community services to the local residents who cannot travel all the way to nearby cities. This
includes space for Imperial County’s Free Library, Behavioral Health Department, Probation Department
and Smart Recovery Program.
Phasing:
The District does not have any plans for the phasing of new administrative facilities. As growth continues
within the District, administrative facilities will continue to be reviewed to ensure that they are keeping
pace with the performance standard projections and that they are adequate to serve the population.
The following table provides an estimate of the phased demand associated with incremental growth
within the planning horizon.
Future Square Footage
Year Projected Population
Demand
2021 6,307 8,199
2025 6,616 8,600
2030 7,021 9,128
2035 7,453 9,689
2040 7,911 10,285
Funding
The new District administrative office building was purchased June 5, 2014, with sewer maintenance
funds, in addition to the former district office building being exchanged as a down payment towards the
new District office building.
The total cost for the new administrative office building amounted to $1,000,000.00. The former
administrative office building was exchanged as a down payment totaling $500,000. This purchase
resulted in an outstanding loan amount of $587,473.28, which is paid by the District monthly, through
payments from the Sewer Maintenance Fund (SM).
The District does not maintain a separate budget line item pertaining to Administrative Facilities.
Instead, the SM provides funding to the General Fund, which in turn funds all items associated with the
District administrative office building. Property taxes are not used to fund the District office building.
The General Fund provides for streetlight installation as well as the ongoing electricity costs for
operating streetlights.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
29
Per Capita Costs:
As stated above, the District does not maintain a separate budget line item pertaining to Administrative
Facilities. The cost per capita for the administrative facilities is embedded within the General Fund.
Future Funding Costs:
In addition to the continued use of existing funding sources, development impact fees may be
established to help fund potential expansions or updates to administrative facilities needed to provide
services associated with future development. If additional funding is needed, bonds can be issued
and/or special assessments can be implemented.
Mitigation
In order for the District to provide adequate administrative services to its residents and ensure that
future demands for facilities are properly identified and addressed, the District should implement the
following measures:
• Continue to periodically review the administrative facilities and personnel of the District
through the preparation of annual reports. These reviews will identify staffing and budgetary
concerns as District growth continues to increase the demand on facilities and staff.
• Maintain agreements and MOUs with the County to continue providing space for County
activities, departments and programs
• Performance of a formal building structural inspection to identify necessary repairs for
construction and associated costs to be incurred by the District
• Develop a long term street lighting and landscaping plan that also addresses the feasibility
of photovoltaic (solar) streetlights.
• Engage and hire a qualified and experienced professional to take over the role of District
General Manager. Maintain the IGM and existing staff for as long as possible to provide a
smooth transition to the upcoming General Manager.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
30
3.2 Wastewater Facilities
Introduction
In 1955, the Desert Shores Community Services District was chartered by the State of California through
Articles A through H of Section 61601 of the Government Code. In 1957, the Salton City area was
annexed to that District and the name of the District was changed to Salton Community Services District
rather than going through the process of forming a new District to encompass both Desert Shores and
Salton City. The District is empowered to construct, operate, maintain, repair, and replace wastewater
system facilities as needed to provide wastewater service in compliance with applicable standards and
regulations. The District routinely constructs new facilities, maintains them, and replaces them as
necessary to maintain adequate, reliable, and safe wastewater service to its customers.
Performance Standard
Wastewater treatment is generally regulated by the State of California. The District is held responsible
to the Waste Discharge Requirements by the California Regional Water Quality Control Board (Board
Order No. 98-008). The State Water Quality Board (SWQB) sets a performance standard of 85 percent
capacity, and by law the District must notify the SWQB upon reaching this level.
Although no formal performance standards currently exist in terms of personnel required to maintain
the wastewater treatment facilities, District representatives have suggested that at least 1.45 personnel
per 1,000 population be staffed at all times. This is based on analyses of the adequacy of existing staffing
conditions and discussions with the District.
Facility Planning and Adequacy Analysis
Inventory of Existing Facilities:
The District owns and operates a wastewater system comprised of the collection, conveyance and
treatment facilities for the communities of Salton City and Desert Shores. There are three wastewater
treatment facilities (WWTFs) in operation within the District and the total peak capacity for the three
facilities combined is 505,000 gallons per day (GPD). The District manages three wastewater treatment
facilities (WWTFs) all utilizing evaporation-percolation ponds to support supplemental treatment
processes: Desert Shores WWTF, Lansing WWTF, and Thomas R. Cannell (TRC) WWTF. A total of 10
workers are employed to provide maintenance to the three facilities.
The specifications for each of the three facilities are detailed below:
TRC:
Includes the following:
• 11 evaporation and percolation Ponds
• Maximum capacity of 185,000 gallons per day (GPD)
• Average daily flow of 181,591 GPD
• Peak flow is 110,468 GPD
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
31
• Average operation is estimated to be above 90% of capacity
• 430 miles of sewer lines shared with the Lansing facility
Lansing:
Includes the following:
• 5 evaporation and percolation ponds
• Maximum capacity of 120,000 GPD
• Average daily flow of 107,713 GPD
• Peak flow of 119,137 GDP
• Average operation is estimated at 85% of capacity
• Shares 430 miles of sewer lines with the TRC facility
Both the TRC (named after Thomas Ramon Cannell) and Lansing facility serve the Salton City community.
In Salton City, there are a total of 16 active lift stations, one backup lift station, and one inactive lift
station conveying wastewater from Salton City that is ultimately discharged into either the Lansing
WWTF or Thomas R. Cannell WWTF. The Lansing facility was built in 1972 and shares sewer lines with
the TRC facility. The original Salton City Wastewater Treatment Plant was decommissioned in October
2008, when the TRC facility was constructed. Since both facilities serve the same area and share sewer
lines, only one facility operates at a time. Operators manually direct the flow between the two facilities
which have a combined capacity of 305,000 GPD. Operators alternate between the two on a weekly
basis, where the District runs a facility average of ten days on a month and average of twenty on the
other facility.
On average the TRC facility operates for an average of 20 days per month and Lansing operates for an
average of 10 days per month. The Lansing facility consists of five (5) ponds and the TRC facility contains
11 ponds. Both the Lansing and TRC facility are currently operating above the 85 percent capacity
threshold at an average combined flow of 287,000 GPD. The District will continue to coordinate with
the SWQB and a qualified engineer to update its wastewater master plan in order to meet the expanding
capacity needs of both the TRC and Lansing Facilities. The TRC and Lansing facilities are monitored daily
with a portion of the maintenance crew on 24 hour standby duty on a rotational basis. Samples are
taken monthly from the ponds and different surrounding locations and are analyzed at qualified
laboratories, which submit reports to the SWQB.
Desert Shores:
Includes the following:
• 7 evaporation and percolation ponds
• Maximum capacity of 200,000 GPD
• Average daily flow of 140,000 GPD
• Peak flow of 160,000 GPD
• Average operation is at 80% capacity
• 25 miles of sewer lines
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
32
The Desert Shores facility is located approximately 1.2 miles west of the Salton Sea. The facility is
adjacent to Coolidge Springs Road, west of State Highway (SH) 86, and one mile southwest of the
community of Desert Shores, California. The Anza-Borrego Desert State Park is located 15 miles to the
southwest of the Desert Shores facility. The number of sewer accessible lots in Desert Shores is
approximately 1,043.
The Desert Shores facility consists of seven (7) ponds and is located on approximately 14 acres of land.
The ponds were constructed on artificial fill that ranges from 12 to 15 feet above the existing surface.
The District estimates that Desert Shores facility operates at an average of 80 percent of capacity.
The Desert Shores facility treats wastewater biologically. The ponds are used to treat influent by
providing biological oxidation, evaporation and infiltration for treatment and final disposal. The ponds
are aerated to achieve biological treatment of the influent and reduce objectionable odors. Disposal of
the effluent is by evaporation and percolation. Due to the variety of sizes of the ponds at the facility,
the level of treatment and disposal of effluent of each pond varies widely. The ponds have a large
surface and a shallow depth, which promotes evaporation as well as growth of algae.
The Desert Shores collection system consists of a system of gravity line force mains and four active lift
stations. The Desert Shores facility has approximately twenty five (25) miles of sewer lines, 264
manholes, and six lift stations. Wastewater is collected from throughout the system by gravity sewer
lines before discharging into the Desert Shores WWTF. The gravity lines range between 6, 8, and 10
inches in diameter and force mains range between 8 and 10 inches in diameter. Small submersible pump
lift stations are used to convey wastewater to two main pump stations. Wastewater is pumped through
force mains to the wastewater treatment plant, which consists of the aerated ponds previously
described. Peak wastewater generation is approximately 160,000 GPD in Desert Shores. The Desert
Shores facility does not currently exceed the SWQB 85 percent threshold.
The District supports approximately 455 miles of sewer lines, dated from the late 1950’s to current day.
In the 1950s, the Salton City and Desert Shores communities were developed, which included the
construction of force main pipelines in the project area. Additionally, gravity sewer pipelines and
manholes were built, connecting to both the entry and discharge points of these force main pipelines.
These collection system components are now around 70 years old and are showing signs of aging. The
last update was performed in 2006 in Westmorland to accommodate for growth in residential
development.
Adequacy of Existing Facilities:
The District has a deteriorating, aging wastewater collection system that has experienced breaks and
sewer spills, compromising ground and surface water quality in the Service Area. To provide more
reliable sewer service to customers, minimize financial impacts to the community, and uphold
compliance with Regional Water Board requirements, the District has leveraged government grant
programs intended to fund infrastructure improvements in disadvantaged communities.
Under Proposition 1, intended for the allocation of funding for Small Community Wastewater Projects,
the District entered a financing agreement with the California State Water Control Resources Board
for sewer force main replacement and other conveyance system improvements. The District was
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
33
awarded a planning study grant to assist with the planning, design and construction of the Desert
Shores and Salton City Sewer Force Main Rehabilitation and Replacement Project.
Through the preparation of a Preliminary Engineering Report (PER), an engineering and design
engineering firm evaluated and identified critical deficiencies in the wastewater collection system. As
part of this project, additional monitoring for the wastewater quality in the conveyance system was
performed at selected locations to collect data and review changes in wastewater quality from select
lift stations and wastewater treatment plants. Results from this effort were incorporated into the
analysis of the wastewater system to recommend design criteria for force main improvements to the
District. The PER provided these recommendations through a series of three alternatives which were
evaluated in terms of feasibility and costs, ultimately to inform the District’s selected construction
project.
Water Quality Adequacy:
District Wastewater Treatment Facilities (WWTFs) are under the regulatory oversight of the Colorado
River Basin Regional Water Quality Control Board and are governed by specific board orders: No. R7-
2014-0007, R7-2012-0035, and R7-2012-0034. The adequacy of the existing wastewater facilities can be
evaluated based on the current self-monitoring reports generated by the California Water Board, the
adequacy of employees available to service the facilities, and the capacity of the system.
The California Regional Water Quality Control Board, Colorado River Basin Region (Regional Water
Board), is the public agency with primary responsibility for the protection of ground and surface water
quality for all beneficial uses within Imperial County. The District is subject to the provision of Self-
Monitoring Reports per authorization of the State Water Resources Control Board.
The District is authorized to discharge treated municipal wastewater from the Desert Shores, Lansing
and TRC wastewater facilities under Waste Discharge Requirements (WDRs) regulated by the Regional
Water Board. Under the terms of the WDRs, the District can discharge up to 0.20 million gallons per
day of treated wastewater. To produce the Self-Monitoring Report, samples retrieved from the
treated wastewater are analyzed to measure levels of pollutants in the water, to measure compliance
with WDR Effluent Limitations.
The latest PER included a water quality and flow monitoring report which was included in the analysis
to identify optimal locations for rehabilitation or reconstruction improvements. Following specified
monitoring parameters, the District operator collected and tested samples from eleven locations
throughout Desert Shores and Salton City for inclusion in the report. During this sampling period, the
WWTFs demonstrated they were generally capable of treating raw wastewater below effluent limits.
PER didn’t identify a consistent pattern of trends week to week which applied to all sample locations.
Monthly Average Biochemical Oxygen Demand (BOD) for Effluent Sample Location
BOD Limit Monthly Average BOD (mg/L)
Month (mg/L) Desert Shores Lansing TRC
May 45 48.4* 41.8 49.8*
June 45 33.3 29.9 31.6
Note: “*” indicates BOD limit exceedance
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
34
As shown on the table above, in the month of May, Desert Shores and TRC WWTFs effluent exceeded
the monthly average BOD the limit of 45 mg/L. All three WWTF’s effluent levels were reduced below
the monthly average BOD limit for the month of June. Note that BOD levels may be influenced by
oversized pipes, long detention times, low flows and/or nitrification which can be caused by system
deficiencies.
Notice of Violations
Per the monthly reports provided by the District to the Regional Water Board, BOD effluent exceedances
have occurred intermittently over the years at all three WWTFs, both on average weekly and average
monthly intervals. In February 2021, the Regional Water Board issued three Notices of Violation (NOVs),
upon review of the District’s Self-Monitoring Reports for November 2020 through December 2020.
2021 Enforcement Documents from Regional Water Quality Control Board (RWQCB)
Date WWTF Name Enforcement Brief Description
11/19/2020 Desert Shores NOV BOD Exceedances July-Aug 2020
11/19/2020 Thomas R. Cannell NOV BOD Exceedance Aug 2020
11/19/2020 Lansing Avenue NOV BOD Exceedance Aug 2020
Desert Shores Facility
The Desert Shores facility received a NOV regarding noncompliance with the WDRs specified in Order
R7-2014-0007, Effluent Limitations B.1 stating that wastewater discharge to disposal ponds shall not
exceed a Biochemical Oxygen Demand (BOD) average monthly of 45 milligrams per liter (mg/L). In the
Desert Shores facility’s November 2020 SMR, the reported BOD in the sample collected exceeded the
monthly limit with a detected concentration of 66 mg/L.
Lansing Facility
The Lansing facility received a NOV regarding noncompliance with the WDRs specified in Order R7-2012-
0035, Effluent Limitations B.1 stating that wastewater discharge to disposal ponds shall not exceed a
Biochemical Oxygen Demand (BOD) average monthly of 45 milligrams per liter (mg/L). In the Lansing
facility’s November 2020 SMR, the reported BOD in the sample collected exceeded the monthly limit
with a detected concentration of 55 mg/L. In the December 2020 SMR, the reported BOD in the sample
collected exceeded the monthly limit with a detected concentration of 49 mg/L.
TRC Facility
The TRC facility received a NOV regarding noncompliance with the WDRs specified in Order R7-2018-
0013, Effluent Limitations B.1 stating that wastewater discharge to disposal ponds shall not exceed a
Biochemical Oxygen Demand (BOD) average monthly of 45 milligrams per liter (mg/L). In the TRC
facility’s November 2020 SMR, the reported BOD in the sample collected exceeded the monthly limit
with a detected concentration of 61 mg/L. In the December 2020 SMR, the reported BOD in the sample
collected exceeded the monthly limit with a detected concentration of 56 mg/L.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
35
NOV District Response
Upon notification of the BOD violations, the District immediately implemented corrective and
preventative actions for each facility to bring the wastewater discharge into full compliance with WDRs.
Since the issuance of the three Notices of Violation, the District has upheld compliance with wastewater
discharge BOD levels and has not received Effluent Limit Violations from the Regional Water Board
since. The District continues to coordinate with the Water Board to ensure the BOD levels reach the
appropriate limit of a monthly average of 45 mg/L.
Sanitary Sewer Overflow (SSO) Spill
In July 2021, the District notified the Regional Water Board of a Sanitary Sewer Overflow (SSO) spill
caused by a force main rupture, which reportedly spilled untreated wastewater into a drainage channel.
The discharge of untreated wastewater into the drainage channel, which is classified as a water of the
United States, resulted in the violation of Order 2006-0003-DWQ, Section C, Prohibition 1, California
Water Code 13376 and Clean Water Act Section 301.
Upon delivery of the notice, the District completed and submitted a SSO Technical Report to the
Regional Water Board identifying the causes and circumstances of the SSO, describing the District’s
response and explaining that the SSO liquid had not reached any waterways prior to cleanup of the site,
therefore no water quality monitoring activities were undertaken.
The cause of the spill was best estimated to be a small earthquake causing a shear crack near the force
main. Upon notification and verification of the spill, the crew was immediately dispatched to shut down
pump stations and gather equipment for the repair. The crew dug up the sewer main, located the shear
crack and immediately cleaned and repaired the pipe. The crew turned on the pump stations to confirm
repair prior to backfilling.
Facility Plans and Upgrades
The District is working with agencies to seek grant funding to replace the entire force main. The
proposed force main replacement project has been designed by a professional engineer in the State of
California from TKE Engineering and the District expects to put the project out to bid soon.
In January 2023, the District update the Sewer Rate Study previously completed in April of 2021. The
updated rate study was completed by the Rural Community Assistance Corporation (RCAC) in early
2023, for faster implementation into existing District policy and pricing structures. According to the 2016
SAP, the Lansing and TRC facilities are currently operating at above 85 percent capacity and there is an
immediate need to expand capacity of two facilities. In addition, the Desert Shores facility is operating
at 80 percent capacity, it is recommended that the District include plans to expand all three wastewater
facilities.
The District’s aging infrastructure requires a systematic and phased approach for restoration of historic
infrastructure and construction service connections. Older infrastructure requires more maintenance
and therefore is more costly to perform standard repairs. In addition, older infrastructure has a higher
possibility for cracks and malfunctioning equipment. Rehabilitation of this infrastructure will be an
ongoing process the District will perform to continue providing quality services to community members.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
36
Employee Adequacy:
The District currently employs 10 personnel to maintain the TRC, Lansing, and Desert Shores facilities.
According to the District, the current number of personnel is sufficient to meet current needs compared
to demand. Using the performance standard below, the existing demand for personnel is as follows:
6,307 Existing Population x 1.45 personnel / 1,000 population = 9 personnel demand*
* Because a fraction of a person cannot exist, this number is always rounded down to the nearest whole number.
Capacity Adequacy:
The three facilities have a total peak capacity of 505,000 GPD. Since two of the three wastewater
treatment facilities operate on alternating schedules the average, peak, and total capacities of the
facilities were analyzed separately, as well as jointly for the TRC and Lansing Facilities, as outlined
below. Both the TRC and Lansing facilities are operating above the 85 percent threshold. It is
important to evaluate the adequacy of existing facilities now and into the future based on peak
wastewater flows to accommodate for the worst-case scenario. The following analysis is based on
peak wastewater generation numbers; however, average wastewater generation information is
provided for informational purposes.
The District is currently applying for a separate planning study grant through the State Water
Resources Control Board to evaluate the latest capacities of the WWTFs. Facility capacities listed
below are from the District’s 2016 Service Area Plan and may not reflect current conditions of the
wastewater system.
TRC and Lansing Facilities
The District currently consists of approximately 6,307 residents, which include 4,557 residents in Salton
City and 1,750 residents in Desert Shores. Actual pumping records confirm that wastewater generation
is peaking at approximately 305,000 GPD for the Lansing and TRC facilities combined. Approximate peak
wastewater generation for residents in Salton City equates to roughly 67 GPD per person. Average
wastewater generation for Lansing is 107,713 GDP and 181,591 for TRC, equating to approximately 24
- 40 GPD per person. The following calculation shows the approximate peak wastewater disposal rate
in Salton City:
4,557 population (2021) x 67 (peak GPD)/ population = 305,319 GPD
Desert Shores Facility
The current estimated population of Desert Shores is approximately 1,750 persons. Actual pumping
records confirm wastewater generation is peaking at approximately 160,000 GPD. Peak wastewater
generation for residents in Desert Shores equates to roughly 91 GPD per person. Average wastewater
generation is approximately 140,000 GPD, equating to 80 GPD per person. The following calculation
shows the approximate peak wastewater disposal in Desert Shores:
1,750 population (2021) x 91 (peak GPD)/ population = 160,000 GPD
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
37
This calculation shows that the Desert Shores wastewater treatment plant is currently below 85 percent
of capacity.
The District is currently in the process of rehabilitating check valves at the headworks of the wastewater
system in these facilities. Check valves tightly seal to prevent backflow which causes double pumping,
resulting in increased flow numbers. According to a visual inspection by maintenance crew staff,
malfunctioning check valves have reported higher average daily flow rates. The District is seeking to
replace and recalibrate flow meters to account for these circumstances.
Future Demand for Facilities:
According to the District, the Lansing and TRC facilities are currently operating at above 85 percent
capacity and there is an immediate need to expand capacity of two facilities. In addition, the Desert
Shores facility is operating at 80 percent capacity, it is recommended that the District include plans to
expand all three wastewater facilities.
The District identified key facilities which should be replaced to improve wastewater system operations,
promote health and safety and reduce effluent levels in treated wastewater discharge. Key facilities and
improvements include: the force main from Lift Station 2 in Desert Shores; force mains from Lift Stations
16, 22, and 24 in Salton City; select manholes downstream of the discharge point of the force main from
Lift Station 16; and the configuration of the cluster of Lift Stations 19, 19B, and 20. As part of the PER, a
series of project alternatives were analyzed and compared to determine feasibility, construction costs
and design criteria. The PER provided recommendations for key improvements and replacements for
the wastewater collection system to improve discharge quality in compliance with State and Regional
Water Board standards.
Based on these findings, the District decided to proceed with the following alternatives:
Proposed Project Components
Alternative DS-FM3 - 6-inch Replacement of Existing Force main from Lift Station 2
Alternative DS-WW1 - Lift Station 2 Improvements
Alternative SC-FM2 - 8-inch Force main Replacement for Lift Station 16
Alternative SC-WW1 - Lift Station 16 Improvements
Alternative SC-WW2 - Manhole Improvements Downstream of Lift Station 16's Force Main
Discharge
Alternative SC-WW3A - Replace Lift Station 19 and Remove Lift Station 19B
Alternative SC-FM4 - 6-inch and 8-inch Force main Improvements for Lift Stations 22 and 24
The District’s aging infrastructure requires a systematic and phased approach for restoration of historic
infrastructure and construction service connections. Older infrastructure requires more maintenance
and therefore is more costly to perform standard repairs. In addition, older infrastructure has a higher
possibility for cracks and malfunctioning equipment. Rehabilitation of this infrastructure will be an
ongoing process the District will perform to continue providing quality services to community members.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
38
TRC and Lansing Facilities
The current TRC and Lansing facilities operate above the 85 percent threshold. The District has
immediate plans to increase the capacity of these plants to their original rated capacity of 1,000,000
GPD with the help of TKE Engineering, whom the District accepted a proposal to Provide Professional
Engineering Services for Waste Discharge Requirements Permit Amendments. The District seeks to
increase the estimated capacity of the TRC and Lansing facilities through a reassessment of the
wastewater facilities to reevaluate their average daily peak flow capacity, which District maintenance
crew members believe are underestimated. In addition, the District intends to replace and rehabilitate
check valves to produce more accurate flow readings for SMRs. The proposed force main replacement
project has been designed by a professional engineer in the State of California.
Desert Shores Facility
The Desert Shore facility has sufficient capacity to serve the existing population; however, the District
recognizes the need for improved and updated facilities to meet the future needs of the Desert Shores
Community and reduce the occurrence of effluent limit violations to comply with state water
regulations. The 2007 Mitigate Negative Declaration (MND) discusses the impacts of implementation of
a Clemson Treatment Process installed within two (2) of the existing ponds that are currently offline at
Desert Shores.
Expansions and improvements to the current aeration ponds and collection system are necessary to
accommodate near term needs. An entire new mechanical treatment plant is necessary to
accommodate the long-term facility demands in Desert Shores. The 2010 Sewer System Management
Plan (SSMP) states that for any project beyond a 200-connection threshold, the District will initiate
construction of a mechanical plant that will have design features enabling expansion to 1 MGD capacity.
In sum, the capacity of the current Desert Shores facility is sufficient. However, with new annexations
or developments into the Desert Shores area the facility will soon approach 85% of capacity.
As of September 2022, the District Board has approved the resolution for District consent for authorized
representatives to Develop Scope of Work for Professional Services for Clean Water State Revolving
Fund (CWSRF) Planning Application for Plant Capacity Expansion. The delivery of this scope of work will
enable the District to perform the necessary capital improvements to increase capacity in each of the
facilities.
Opportunities for Shared Facilities:
The District does not share wastewater treatment, storage or distribution facilities with other
jurisdictions, and there is no opportunity to share such facilities.
Phasing:
Information on peak wastewater flows from pumping records are used to predict anticipated peak
wastewater generation in both the Salton City and Desert Shores facilities. The future number of
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
39
employees is based on the performance standard of 1.45 employees per 1,000 population as it applies
to the total District population.
Funding
In tandem with the preparation of the PER, the District began working with the Rural Community
Assistance Corporation (RCAC) to help apply for grant funding and conduct an updated Wastewater
Rate Study to ascertain rates that would meet its existing and future revenue needs. The Rate Study
was intended to ensure compliance with California Proposition 218, also known as the "Right to Vote
on Taxes Act," which mandates that local governments must obtain approval from affected property
owners or ratepayers before imposing, increasing, or extending certain assessments, fees, and charges.
Under Prop 218, a specific procedure was followed by the District to formally adopt new fees:
1. Provision of Notice
2. Public Hearing
3. Ballot Process
4. Majority Approval
The Wastewater Rate Study provided a rate schedule for a five-year period based on the costs to
continue providing utility services, maintain an operating budget and prepare for future growth. The
rate changes are intended to bolster the wastewater enterprise budget, balance expenditures and
needed reserves and fund future capital improvements. The finalized Rate Study was provided to the
public prior to the vote.
RCAC assisted the District in following the required Prop 218 procedure for notifying the public and
informing them of their rights to protest future rate changes through a majority opt-in voting process.
RCAC delivered this presentation to the community on May 17, 2023 which presented the findings of
the Rate Study and ensured compliance with Prop 218.
The primary sources of revenue for wastewater treatment and collection facilities are the sewer
capacity and connection fees for new developments along with yearly sewer user fees. Currently, a
connection fee of $3,700 per residential unit is required. Sewer user fees are currently $640.74 per
year/residential unit. With the proposed rate adjustment, in June of 2024, the user fee would increase
to $838.41 per year/residential unit. After the first year, this would be followed by an annual 4 percent
increase to base and usage rates and 5 percent for the stand-by fees to offset the impact of inflation.
The proposed rate schedule is shown in the table below:
Adjusted Rate 5 Year Rate Schedule
Rate Type Year Year 2 Year 3 Year 4 Year 5
Base Rate $838.41 $871.95 $906.82 $943.10 $980.82
Maintenance $16.99 $17.84 $18.73 $1,967 $2,065
Standby Fees
Standby Fees $21.00 $21.00 $2,100 $2,100 $2,100
Usage Rate $10.08 $10.48 $10.90 $11.34 $11.79
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
40
On July 19, 2023, the District Board of Directors held a second public hearing at the District office to
consider the proposed rates and gather protest ballots from users voting against the rate increase. From
the collection of ballots, it was determined that a majority consensus from the community was not
achieved, therefore the proposed rate increases were adopted by the District. In demonstrating the
District’s financial ability to function and become financially solvent over time, the Imperial Local Agency
Formation Commission (LAFCO) notified the District that the previous determination for dissolution
would be reconsidered if funding opportunities materialized.
Other sources of revenue are from interest income on accounts and equipment rental. The collected
revenue is used for maintenance of the sewer system including vehicles and equipment, utilities,
laundry, janitorial, salaries and other miscellaneous expenses. Capital purchases such as equipment,
tools, and furniture, as well as pump stations, sewer lines, lumber, hardware, labs, and other
professional and sewer project expenses are provided via these funds. The District will continue to
utilize these funding sources in addition to searching for other sources to improve the existing system
in order to meet future demand.
In order to reduce wastewater treatment facilities maintenance and capital improvement costs, the
District completes most repairs in house and provides qualified staff for maintenance purposes. The
maintenance crew takes care of most problems without having to seek outside assistance.
Reserve Funds
The District maintains reserve funds necessary to uphold credit worthiness and provide funding for
infrastructure replacement, economic uncertainty, revenue loss, natural disasters, debt, cash flow
requirements and to comply with unfunded mandates. Use of these reserve funds is procedural and
closely monitored to ensure funds are use appropriately.
Prior to being met with litigation by former General Manager (GM) of the District, the District
maintained reserve funds of $222,000. In December of 2021, a settlement was reached between the
District and former GM. The financial settlement was approved in alignment with severance obligations,
and the District awarded severance pay to the amount of $192,000.
Per Capita Costs:
For the fiscal year of 2022-23, the District’s total costs are projected to be $1,934,007.
The current estimated population in Desert Shores and Salton City is approximately 6,307 persons. Using
the current population of 6,307, wastewater services costs equate to $306.64 per resident. This data
was calculated by dividing the annual budget for wastewater services by the existing population:
$1,934,007 costs / 6,307 population = $306.64 per capita per year
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
41
Future Funding Costs:
A cost estimate for future wastewater facilities is provided in the table below. These estimates were
calculated by utilizing the existing per capita costs to determine future costs based on population
projections.
Future Costs for
Year Projected Population
Wastewater Facilities
2022 6,307 $1,934,007
2025 6,616 $2,028,730.24
2030 7,021 $2,152,919.44
2035 7,453 $2,285,387.92
2040 7,911 $2,425,829.04
Future Funding Sources:
The fee structure will need to be reviewed annually and during proposed annexations to ensure that
there is sufficient funding to provide wastewater service to new developments. The rate increases
outlined in the Salton Community Services District Sewer Rate Study should ensure that the District has
sufficient funds to provide for sewer operations over the next five years and beyond.
The District retained the services of the Rural Community Assistance Corporation (RCAC) to finalize the
Wastewater Rate Study to evaluate the existing needs and future needs of the sewer system, both on
an infrastructure level and financial level. With greater income from the adopted sewer rate tax, the
District became better equipped to perform necessary repairs, developments and expansions of the
sewer and treatment systems.
The PER was finalized in September 2023 upon the District’s determination of the Selected Construction
Project. With an improved financial outlook stemming from the increase in user fees, the District was
also empowered to begin the process of applying for grants to fund the preferred capital improvements.
The Clean Water State Revolving Fund (CWSRF) is a federal-state partnership program designed to
provide financial assistance for clean water infrastructure projects. It offers low-interest loans and
grants to eligible entities like the SCSD, with the goal of improving water quality and environmental
protection.
RCAC will provide the staff time, expertise and technical assistance to research and write grant
applications on behalf of the District. This application will provide a detailed project proposal, outlining
the scope, objectives, and expected outcomes of the wastewater system project. The grant application
will also outline how the district intends to manage and maintain the project after completion. This may
include budget projections, rate increase plans, and strategies for covering ongoing operational costs.
RCAC will ensure that the grant application adheres to all program requirements and guidelines set forth
by the CWSRF. Through collaboration between relevant agencies, stakeholders and the District, the
grant application will be submitted to secure necessary funding to advance the Selected Construction
Project.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
42
Mitigation
Upon completion of the Rate Study, finalization of the PER and adoption of the Prop 218 rate increase,
the District was given the opportunity to demonstrate their ability to continue providing wastewater
services through the Municipal Services Review. This involves the preparation of the Service Area Plan
(SAP), which also includes mitigation strategies to prevent future violations and ensure compliance with
federal, state and local standards.
To provide adequate service to its wastewater customers as development continues within its
boundaries and within the Sphere of Influence, the District should implement the following measures:
• Continue to periodically review the wastewater rate and financing structure to
ensure adequate funding for the implementation of new projects and the
maintenance of existing facilities. The Salton Community Services District
Wastewater Rate Study recommended an increase in sewer rates of 30 percent In
June 2024 and incremental increases of 4 percent in the subsequent four years to
ensure the system is financially viable. This study was updated in January 2023.
Per Prop 218 requirements, the user rate increases were brought to the
community for a vote in July 2023 and were ultimately adopted by the District.
• Establish District goals in terms of Biological Oxygen Demand (BOD) and total
suspended solids (TSS) levels and continue to monitor activities at all three
Wastewater Facilities. Implement best management practices (BMPs) for
wastewater treatment to minimize pollutants and protect water quality.
• Prior to the recordation of a Final Map for a development project proposed within
the District Sphere of Influence, the District shall require a development
agreement enforced by the County Land Use Ordinance, indicating that adequate
wastewater service would be available to the completed project.
• To meet the wastewater treatment needs of the existing population in Salton City,
the District will construct an expandable ponding system per the design and
specification requirements of a qualified engineering firm. Phase 1 for expanding
the wastewater treatment needs include updating the TRC facility to a rated
capacity of 1 MGPD and phase 2 would expand capacity to 3 MGPD to
accommodate future District demand.
• Implement a robust monitoring and reporting system complying with LAFCO
guidelines to track the progress and effectiveness of mitigation measures.
Regularly communicate findings and updates to the public and relevant authorities
based on the requirements set forth in LAFCO’s Staff Report for the District.
Adhere to all direction from LAFCO throughout probationary status.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
43
• Release bid packages and secure construction contracts to proceed with the
selected alternative. Obtain necessary permits and provide required notifications
to agencies to receive authorization for completing the improvements.
• Conduct biological and cultural resource studies to address the federal cross-
cutter requirements of the federal Clean Water State Revolving Funding program.
• With the assistance from RCAC, develop a Clean Water State Revolving Fund
(CWSRF) Planning Application to fund the Selected Construction Project and
promptly execute the bidder selection process to complete the improvements.
• Prepare detailed system maps of the sewer system, drainage basins, hydraulic
models, or record drawings (as-builts) as required as part of the Sewer System
Management Plan (SSMP) mandated by the Regional Water Quality Control Board.
• Apply for a separate planning grant through the State Water Resources Control
Board to evaluate the capacities of the WWTFs.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
44
3.3 FIRE FACILITIES
Introduction
As of November 2019, the District no longer provides fire protection/emergency medical services to
the Service Area. In May 2019, the District Board voted to authorize an election for a Special Tax for
Fire Protection Services. The election for the Fire Protection Parcel Tax did not pass with the required
2/3 vote. The District Fire Department, promptly resigned from their positions, without a transition
plan in place to continue fire protections in the Service Area.
In 2020, the Board motioned for the former General Manager, to negotiate fire coverage for the
District Service Area. However, LAFCO was not notified of the change in provision of services and
County negotiations were never settled. The County of Imperial took action and stepped in to
continue Fire Protection Services for District residents. Currently, all fire personnel are staffed by the
County of Imperial Fire Department.
Imperial County Fire Station #9 is located at the Imperial County Road District #3 Satellite Road Yard at
2256 West Cleveland Ave. Salton City, CA 92275. The County currently uses a mobile home structure for
personnel and utilizes the yard to hold emergency vehicles.
Performance Standard
The District’s authority to provide Fire Protection Services has not yet been formally removed by LAFCO,
however the County is currently providing those services to the residents in the unincorporated Service
Area. County Fire Protection standards are currently being used as a substitute until the determination
of long-term Fire Protection Service plans for the area are set in place. Historically, a goal of the staff
was to make it to the emergency site within eight minutes of receiving notice. Another goal of the staff
is a three-minute "out the door" response time. Therefore, the performance standard necessary to
maintain the current level of service shall not exceed the eight-minute station to site response time as
well as the three-minute out the door time.
The District does not maintain performance standards for square footage of their facilities. Therefore,
a future performance standard can be determined based on each existing facility’s square footage and
the existing population at the time of the preparation of the Service Area Plan. The total square footage
of the Fire Station is approximately 1,850 square feet. Therefore, the performance standard for fire
facilities for the District is 293 square feet per 1,000 population. In the previously drafted 2006 SAP, the
performance standard was based off of two fire facilities totaling 3,800 square feet, with a performance
standard of 690 square feet per 1,000 population.
Similarly, although the District does not maintain a personnel standard for fire services, the adequacy
of the existing staff suggests that a metric for staffing of 2.17 staff persons per 1,000 population is
suitable.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
45
Facility Planning and Adequacy Analysis
The District no longer provides fire protection/emergency medical services to the Service Area. As stated
above, all fire personnel are currently staffed by the County of Imperial Fire Department. In addition to
responding to fire related emergencies, the fire department responds to traffic collisions as well as
medical emergencies to bridge the time gap until an ambulance/EMT arrives. The American Medical
Response (AMR) Ambulance Service currently provides ambulatory services and operates out of the fire
station in Salton City.
Inventory of Existing Facilities:
The District formerly operated one fire station located at 1520 Nile Drive in Salton City. The Station
comprised approximately 1,850 square feet and included the following equipment:
• Two (2) fire trucks
• One (1) ambulance (owned and operated by AMR)
• Two (2) defibrillators (one located at the district office, and the second one at
the shop)
Imperial County Fire Station #9, is currently overseeing fire protection and emergency medical services
to the District Service Area. The facility uses a mobile home structure for personnel and is located at the
Imperial County Road District #3 Satellite Road Yard at 2256 West Cleveland Ave. Salton City, CA 92275.
In 2022, the District formally transferred ownership of a fire engine to the County, which is now utilized
for emergency response and is stored in the station yard. Firefighter staffing is provided by the Imperial
County Fire Department. Fire staff are available seven days a week to respond to emergencies.
Adequacy of Existing Facilities:
The fire staff have a response time goal of eight minutes. However, meeting this response time goal is
a challenge when servicing communities such as Vista Del Mar and other calls originating far from the
station. Additionally, since the District’s volunteer fire staff has been disbanded and firefighter staff are
from the Imperial County Fire Department, there have been some concerns over delayed response
times due to the complex geography of the District and having the District served by non-local
responders.
Future Demand for Facilities:
As the District continues to grow, so does the need for fire services and facilities. There is a present need
for training County staff to achieve the response time goal of eight minutes to the site. Given the large
service area covered by the District, the need for training to achieve adequate response times will only
increase as growth occurs and presents additional demands for fire services. With a population
expected to reach 7,911 by the year 2040, additional fire facilities and personnel will be needed to serve
the future residents of the District. In order to meet this future demand, an additional 2,318 square feet
of fire facilities and 17 personnel total will be needed.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
46
Opportunities for Shared Facilities:
The District no longer provides fire protection/emergency medical services to the Service Area. The
District’s authority to provide fire services has not yet been relinquished by LAFCO, however services
have been taken over by the County. The District formally transferred a fire engine to the County to
support their fire protection services for the Service Area. The District still owns the former fire station
and protective equipment, which could be transferred to the County in the future.
Phasing:
The District no longer provides fire protection/emergency medical services to the Service Area.
However, the following table provides an estimate of the phased demand associated with incremental
growth within the planning horizon using the updated standard of providing 293 square feet of facility
space per 1,000 population.
Future Personnel Future Square
Year Population
Demand Footage Demand
2021 6,307 14 1,848
2025 6,616 14 1,938
2030 7,021 15 2,057
2035 7,453 16 2,184
2040 7,911 17 2,318
Funding
The District fire department personnel resigned from their positions upon the rejection of the Fire
Protection Parcel Tax. This made the District lose authority to provide fire protection services to the
County due to not having enough funding to operate and maintain the fire department. Imperial County
began providing fire protection services to the Service Area in November 2019. To this date (2022),
Imperial County has not scheduled or reached out to the District regarding payment toward fire
protection services they are providing.
Mitigation
To provide adequate fire protection services as development continues within District boundaries and
within the Sphere of Influence, the District should implement the following measures:
• Support the County’s fire protection services through negotiations and agreements
to provide fire protection and emergency response services to the service area
• Facilitate shared use of facilities, vehicles and protective equipment with the
County
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
47
3.4 PARK AND RECREATIONAL FACILITIES
Introduction
The Salton Community Services District welcomes and encourages community groups and individuals
to use parks and recreation facilities in the District. Certain parks and facility space may be reserved for
various functions, provided that such use does not conflict with regularly scheduled District programs.
Performance Standard
Objective 8.2 of the Imperial County General Plan is to ensure that new developments provide
improvements to meet the added demand for parks and recreational facilities. While no objectives or
performance standards have been formally adopted by the District for park facilities, Imperial County
General Plan's established recreation objective applies to the intent of the District, described below.
In order to assure consistency with Objective 8.2 and the goals of the District, when new residential
developments are approved, developers are required to dedicate Open Space land such as parks to the
District at a ratio of five acres per 1,000 projected residents, or pay a park impact fee to the District to
help fund the maintenance of current parks and the expansion of the park system. This ensures a
designated ratio of parks per population within a community and the adequacy of existing parks. This
ratio is generally consistent with designated Urban Areas throughout Imperial County and meets state
requirements.
6,307 Existing Population x 5 Acres / 1,000 Population = 32 Acres
Facility Planning and Adequacy Analysis
Inventory of Existing Facilities:
The District maintains two constructed park facilities, the Salton City Community Park (10.5 acres) and
the Desert Shores Park (4.59 acres). The opportunity exists for additional park development within the
District on a total of 102.37 undeveloped acres, which brings the total possible combined park acreage
within the District (including developed and undeveloped acreage) to 117.46 acres. The list of parks and
possible park acres is as follows:
Park Acreage Owned by the District:
Salton City Community Park = 10.5 acres
Desert Shores Park = 4.59 acres
Undeveloped (possible) park/open space properties = 102.37
Total = 15.09 acres of developed park facilities and 117.46 acres of possible park space
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
48
At the time this SAP has been amended, there is one designated employee and one in training for
maintaining the two public parks. The employee(s) are responsible for collecting any recreational fees,
mowing the lawns, and providing general oversight over all of the parks.
There are a number of privately owned and operated recreational activities and areas within the District
as well, and these are discussed below.
Salton Community Park
The Salton Community Park is
located in Salton City about
one mile from the District
administrative offices at the
northwest corner of Harbor
Drive and Iridescent Avenue.
The picnic/activities area is
open year round. This area
includes a basketball court, a
covered patio area, picnic
tables, barbeque stands, and
public restrooms.
Photo of park entrance at Harbor Dr and Iridescent Ave
Desert Shores Community Park
The Desert Shores
Community Park is located in
the Community of Desert
Shores. It covers nearly five
acres and includes a baseball
field, basketball courts, and
playground equipment. The
park has ample parking and
includes public restrooms.
Desert Shores Community Park
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
49
Additional Recreation Resources:
Johnson's Landing Boat Launch Facility
The Johnson’s Landing and Boat Launch Facility is located at the north end of Sea Garden
Avenue, just east of North Marina Drive. The property includes a boat ramp, public restrooms,
an RV dump station, and boat wash. The RV dump station and boat wash are free and open to
the public. Additionally, the property offers ample free parking for boat trailers and their tow
vehicles.
Martin Flora Park
The Martin Flora Park is a day use park located at the northern end of Seaport A venue and
adjacent to the Salton Sea. The park has covered picnic areas with barbeque stands and public
restrooms.
Adequacy of Existing Facilities:
Applying the performance standard of five acres per 1,000 residents to the estimated District population
of 6,307, the District should include a minimum of 32 acres of parkland. The current park acreage of
16.91 acres falls below this standard.
6,307 Existing Population x (5 acres / 1,000 Population) = 32 acres
15.09 acres of developed park facilities - 32 acres of current demand = 16.91 acre deficit
Future Demand for Park and Recreation Facilities Staff:
Based on the 2040 population projection of 7,911 the District will need 40 acres of recreational open
space in order to be consistent with the performance standard objective. This indicates that the District
will have a deficit of parkland by the year 2040. This figure was determined as follows:
5 Acres/1,000 Population x 7,911 Population = 40 acres of future demand
Opportunities for Shared Facilities:
It is common for municipalities to share recreational facilities with school districts, making school
related fields and playgrounds accessible to the public. At the time this SAP was published, the District
has not investigated resource sharing with the Coachella Valley Unified School District.
Phasing:
To enhance the District’s park facilities, the District will perform a landscape redevelopment project for
Salton City Community Park, to assist in dust depression and air pollution controls. This project will be
designed and completed by June 2024.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
50
In addition, the District will perform a phased redevelopment of Desert Shores Community Park to
provide an open green space for residents to enjoy known as Desert Shores Soccer Park. The District is
performing landscape and irrigation installation, in addition to other facilities to support the upcoming
development.
The District will coordinate with the Imperial County Air Pollution Control District (ICAPCD) to perform
incremental improvement projects in Desert Shores Community Park. Upon completion of each phase
of the project, the District will engage ICAPCD to perform inspection and review of the redevelopment,
to ensure compliance with funding requirements.
Additional parks will gradually be required in order to continue to meet the adopted standard as the
District’s population grows. Based on the standard of providing 5.0 acres of park land per 1,000
population, the following table represents the demand for parkland acreage for the next 20 years in five
year increments. As the table shows, the District currently has enough park land to accommodate
projected population growth through the year 2040.
Year Projected Population Park Acreage Required
2021 6,307 32
2025 6,616 33
2030 7,021 35
2035 7,453 37
2040 7,911 40
Funding
Parks and Recreation funding comes from the General Fund, California State Parks Grants, and interest
on these grants. It is recommended the District investigate the process of relinquishing all
responsibilities for Parks and Recreation to the County of Imperial due to lack of reliable and reoccurring
funding sources.
Per Capita Costs:
The District’s expenditures on parks in the 2019-2020 fiscal year totaled $49,735.96. Projected
expenditures on parks for 2020-2021 show an increase in expenditures, primarily associated with a park
improvement expense line item (for Desert Shores) of $40,000 for the year, compared to less than
$3,000 in 2019-2020. However, park improvement expenses for Salton City parks are projected to
decrease from around $44,000 in 2019-2020 to $20,000 in 2020-2021.
Using the calculated 2021 population of 6,307 residents in the District, park and recreation services
costs are $7.89 per resident. This data was calculated by dividing the actual parks and/ recreation
expenses from 2019-2020 by the existing population.
$49,735.96 cost / 6,307 residents = $7.89 per capita
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
51
Future Funding Costs:
It is recommended the District start the process of relinquishing all responsibilities for Parks and
Recreation to the County of Imperial due to lack of reliable and reoccurring funding sources. If the
District does continue to manage Parks and Recreation, it is essential that the District require developers
of new residential developments to dedicate parkland and/or pay development impact fees for the
improvement and expansion of existing park and recreational facilities in accordance with applicable
State statutes. It would also be critical that the District develop and implement a long term maintenance
and improvement plan for all park and recreational facilities within the District.
Awarded Grants
The District has received two grants in support of Parks and Recreation projects in the Service Area.
The State of California Department of Parks and Recreation, in accordance with the California Drought,
Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018, awarded the District
with a $177,952 grant to support the redevelopment and restoration of the Salton City Community Park.
The District will use the grant funds to restore the Salton City Community Park by contracting landscape
architects and engineers to assist in the design and redevelopment of the landscaping. Landscape
architects will conceptualize an updated site plan which will implement dust control measures to assist
with dust pollution challenges faced by community residents. The District will meet the project
performance period to have the project designed and completed by June 2024. As of November 2022,
the District Board approved to direct staff to commence applications to begin the improvements to the
Salton City Park for Landscaping grant funding.
The District also received a funding project grant from the Imperial County Air Pollution Control District
(ICAPCD) as part of the Clean Air Trust Fund. In order to reduce particulate matter (PM ), ICAPCD
10
awarded a $200,000 grant to the District to install 33,000 square feet of real grass in Desert Shores
Community Park. The Funding Agreement states that the project must be funded and fully executed by
the District prior to review, inspection and reimbursement by ICAPCD.
The District intends to adopt a phased approach to completing the green space project, through
incremental contributions by the District to perform the work, until ICAPCD performs their inspection
and approves the reimbursement. This is the most feasible and cost-effective approach for the District
to leverage the total amount of funds while maintaining necessary reserves and ensuring the work is
completed to the standard of ICAPCD.
As of September 2022, the District Board authorized to proceed with the preparation of the contract
documents and bidding of the Desert Shores Community Park Project and gave direction to staff for use
of real grass under the Clean Air Trust Fund Grant.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
52
Mitigation
In order for the District to provide to its residents adequate park land that is efficiently managed and
maintained as growth continues within the District, the following measures should be implemented:
• Leverage State and County grants to perform capital improvement projects in the Salton City
Community Park and Desert Shores Community Park. Ensure compliance with grant funding
requirements and meet the standards necessary for expenditures and reimbursements.
• Implement reliable and reoccurring funding sources to finance park and recreational facilities.
If budget cannot be made available, it is recommended the District relinquish its rights to service
parks and recreation to the County.
• Require developers of new residential developments to dedicate parkland and/or pay
development impact fees for the improvement and expansion of existing park and recreational
facilities.
• Develop a maintenance and improvement plan for all park and recreational facilities within the
District taking into consideration the results of the questionnaire distributed by the Community
Recreation Complex Commission.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
53
3.5 SANITATION AND SOLID WASTE DISPOSAL
Introduction
The District maintains an agreement with Burrtec for the collection and disposal of all commercial,
residential, industrial, and construction refuse within the jurisdictional boundaries of the District. Every
year, the District and Burrtec renew a ten-year contract. District and Burrtec participate in a ten-year
agreement which is reassessed every year to determine rates based on operating costs and participating
users. The exclusive franchise agreement for solid waste and recycling services between Burrtec and
the District became effective in September of 2009 and was amended in December of 2019.
Performance Standard
The California Integrated Waste Management Board (IWMB) is the designated State agency to oversee
and manage California’s waste resources generated each year. The Imperial County Integrated Waste
Management Board is tasked with ensuring the proper disposal of solid waste within the District. The
IWMB sets a waste diversion rate goal of 50 percent, which means Imperial County must divert 50
percent of the waste generated within its jurisdiction. Special Districts are not held individually
responsible for this goal but do contribute to the overall ratio of solid waste diversion in the County of
Imperial.
The IWMB typically requires a 15-year planning capacity for landfills that do not have diversion plans in
place. District residents may independently dispose of solid waste at the Salton City Landfill, which has
a closure date in excess of 50 years. Burrtec typically disposes District waste at Lamb Canyon Sanitary
Landfill, Badlands Sanitary Landfill, or El Sobrante Landfill.
Facility Planning and Adequacy Analysis
An agreement exists between Burrtec
and the District for the collection and
disposal of all commercial, residential,
industrial, and construction refuse
within the jurisdictional boundaries of
the District (see Appendix A). Burrtec
provides all labor, material, and
equipment necessary for the collection
and disposal of all refuse within the
District, as well as the collection and
payment of these services. Burrtec, or
delegated agents, also collects and
removes all rubbish, waste material, Sign for the Salton City Landfill. Photo from Jay Calderon, August 2014
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
54
construction material, hazardous waste and rubble as outlined and defined in the service agreement.
Per District approval, Burrtec may collect and dispose of dirt, sod, rock, or other bulky heavy objects for
an additional service charge. All commercial waste must be collected in bins at locations approved by
the District and that provide clear access.
Burrtec has an established route and schedule for collection of refuse and provides each individual a
collection schedule, including alternative days for holidays. All operations are conducted in the least
obstructive means possible. Burrtec typically disposes District waste at Lamb Canyon Sanitary Landfill,
Badlands Sanitary Landfill, or El Sobrante Landfill.
All residents of Imperial County, inclusive of all District residents, can independently dispose of solid
waste at the Salton City Landfill, which is a Class III landfill. The Salton City Landfill is permitted for up to
6,000 tons per day and/or 498 vehicles, and is open on Saturdays from 7am to 4pm. Disposal of
hazardous wastes is not permitted. Since 1994, the burying of any metal with recyclable value has been
prohibited. A bin exists on site for white goods such as refrigerators, stoves, etc. for transport elsewhere.
Inventory of Existing Facilities:
The District’s contract with Burrtec ensures the
adequacy of solid waste disposal facilities and
services. This includes provision for bins, trucks, and
associated equipment as well as adequate collection
and disposal capacity. Residents of the District may
opt to dispose of solid waste at the Salton City Landfill,
which is located seven miles west of Highway 86,
south of Salton City.
Adequacy of Existing Facilities: Photo of a Burrtec Vehicle
The commercial bins maintained by Burrtec are in a satisfactory condition as guaranteed per the solid
waste contract. All collection trucks are in good mechanical condition and washed once each week per
the contract as well. All trucks are watertight and leak-proof with adequate coverings to prevent refuse
spillage. As stated above, the contract with Burrtec ensures the adequacy of solid was disposal facilities
and services.
The Salton City Landfill, which is primarily used by residents that do not subscribe to services via Burrtec,
has capacity in excess of 50 years. The site is approximately 300 acres, of which only seven acres are
currently disturbed. The site continues to have adequate capacity to meet the needs of District
residents.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
55
Future Demand for Facilities:
As the District continues to grow, so does the need for solid waste disposal services and facilities. The
ten-year franchise agreement for Solid Waste and Recycling Services with Burrtec was amended as of
December 2019 to include collection services for residents on the Imperial County Tax Roll.
The Salton City Landfill has a closure date in excess of 50 years. This site will continue to suffice for
District needs now and into the future.
Opportunities for Shared Facilities:
The District has a contract with Burrtec for solid waste disposal services. In the future, a goal of the
District is to decrease reliance on contracted services and provide in-house trash collection services.
Phasing:
The District has no phasing plans for sanitation/solid waste services. As growth continues within the
District, solid waste services will continue to be reviewed to ensure that they are keeping pace with the
performance standard projections and that they are generally adequate to serve the population. A study
of the long-term implications of mandatory trash collection pick-up and the implication of in-house trash
collection would be useful to provide concrete phasing plans for future facilities development.
Funding
Burrtec performs all residential, commercial, industrial, construction, and roll-off billing per the
conditions of the solid waste agreement signed by the District. To assist with the collection of funds,
Burrtec and the District agreed to place all District Residents on the Imperial County Tax Roll for Solid
Waste and Recycling Services, with the option to “opt-out” for direct billing or perform their own Self-
Hauling. Direct costs billed to end users at rates determined by Burrtec. Each year, rates are assessed
by Burrtec based on operating costs and are defined in the annual renewal agreement negotiated by
the District. The District takes 5% of the annual revenue for administering the solid waste services.
Future Funding Costs:
Refuse collection rates are pre-determined in the contract between Burrtec and the District. Rate
increases may only be made by a resolution passed by the Board of Directors of the District. As stated
in the contract, commencing on the anniversary date of the agreement, the rates set forth shall be
adjusted upward or downward to reflect changes in the cost of doing business, as measured by
fluctuations in the consumer price index (CPI). In addition, Burrtec may petition the District with written
requests for rate adjustments on the basis of changes in the cost of doing business, such as labor, fuel,
insurance, etc. All costs are subject to change upon contract expiration. The land use fee on property
taxes will continue to be used as a funding source for operation of the Salton City landfill.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
56
4. FINANCING
Introduction
This section of the Service Area Plan (SAP) discusses various financing mechanisms available to the
District. It also describes how each existing facility is currently financed and how future financial
demands for these facilities can be satisfied. This section also discusses recommended finance plans
and available financing options.
In 1996, Proposition 218, a Constitutional amendment, was enacted. Prop 218 clearly defined general
taxes and special taxes and set guidelines on the issuance, use, and implementation of taxes, fees, and
charges. Proposition 218 applies to local governments in California, including Special Districts. General
taxes must be approved by a majority of voters before they can be imposed, extended, or increased.
Special taxes require an approval by a two-thirds vote of voters.
Financing Opportunities and Constraints
The following list presents sources of revenue that are currently utilized by the Salton Community
Services District to accumulate funds necessary to develop and operate the various facilities and services
discussed within the Service Area Plan.
A. General Taxes
General taxes generate revenue that is deposited in a District’s General Fund and can be
used to support various improvements and services including general government
operations, development services, public safety services, and community services. These
revenues can also be used to construct public facilities. Per Proposition 13 (1978) the
District General Fund earns one-half of 1 percent of the property taxes collected by the
County of Imperial. The District General Fund is maintained via taxes, fees, and interest on
accounts. The District essentially resembles an enterprise district in which the residents are
charged a fee for services used, and the fees provide the funding reflected in the General
Fund. The District is not as reliant on general taxes for day-to-day operations as it is on
service fees; however, with some growth anticipated within the District over the next 20
years, the District may need to obtain additional sources of funding for its operations.
B. Local Bond Issues
The District can issue general obligation (GO) bonds to finance the acquisition and
construction of public capital facilities and real property. These bonds cannot be used for
operations and maintenance or to purchase equipment. GO bond measures must be
approved by two-thirds of the jurisdiction’s voters.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
57
C. Development Impact Fees
Development Impact Fees can be a significant funding source to finance large scale public
facilities and services. These fees are intended to ensure that new development pays its
proportional share of costs for public facilities and services based on the impacts created
by the new development. In concept, the District charges the development community a
series of fees, which provide the source of income to pay for capital projects and services.
When enough cash has been assembled, the District constructs capital facility projects in
order of priority. Development Impact Fees can be used for the following public facilities:
• Fire Protection
• Streetlights
• Sewer Services
• General Facilities
• Open Space Acquisition
• Park Land & Facilities
D. Developer / Builder Contribution
Many of the sewer, fire, park, solid waste services, and administrative improvements
required as a result of new development can be directly funded and constructed by the
developer and/or builder(s) through private funding sources. Facilities earmarked for
developer / builder funding are typically those which normally would have been imposed
as a condition of approval of a tentative map under the existing development review
process.
E. User Fees
User fees are usually authorized by statute for specific uses and are typically required for
monthly services. The fees are used as a revenue source to maintain the systems in proper
operating condition and for the construction of facilities needed to meet demand.
F. Special Assessments
Districts can charge benefit assessments to pay for public works such as sewers and parks.
Property owners pay benefit assessment only for the projects or services that directly
benefit their property. The amount of the assessment must be directly related to the benefit
received. As a result, a Community Services District may be broken into zones, which only
pay for those facilities and services that provide a benefit to that zone. Proposition 218
(1996) required local governments, including Districts, to get weighted ballot approval from
property owners before they can create assessment districts and levy benefit assessments.
G. Fire Suppression Assessment Act (Government Code Section 500078 et seq.)
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
58
Under this act, a special district is allowed to levy assessments on specific parcels or zones
for the provision of fire suppression services. A fire suppression assessment does not
require the formation of an assessment district but requires the adoption of an ordinance
or resolution in which the parcels or zones subject to the assessment must be identified. In
addition, all requirements of Proposition 218 must be met when imposing a fire suppression
assessment.
H. Community Facilities District
A Community Facilities District (CFD), not to be confused with a Community Services
District, falls under the 1982 Mello-Roos Community Facilities Act. This Act allows a CFD to
be established by cities, counties, special districts, and school districts to fund a variety of
facilities and services. Note that the boundaries of a CFD are not required to be contiguous
to any other jurisdiction, as they are for a CSD. In order for a CFD to be formed, a public
hearing must occur, and an election (with a two-thirds affirmative vote) be held to authorize
the specified tax levy. The special tax levy (Mello-Roos tax) is used to either provide direct
funding or pay off bonds. The facilities being funded are not required to be physically
located within the boundaries of the CFD.
I. Federal Funding
Various government programs are available at the State and Federal levels to assist local
jurisdictions in financing public facilities and services. Most funding sources at the State
level require an application requesting assistance and specify the projects or purposes for
which the funds can be used. Financial assistance from the state can include grants, low
interest loans and matching funds. At the Federal level financial assistance includes grants
and federal matching funds for state run assistance programs. State and Federal funding
sources include the following:
Community Development Block Grants (CDBG)
CDBG funds must be used within a broad functional area, such as community development.
These federal funds are distributed to local governments through a local clearinghouse. The
allocation amount is based on a formula.
Fixing America's Surface Transportation (FAST) Act
Under this act, federal funding is available for street and road improvements and repairs.
USDA Water and Waste Disposal Loans and Grants
Rural municipalities with a population of 10,000 or less are eligible for Water and Waste
Disposal Loans and Grants from the USDA. These loans are for the purpose of developing
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
59
water and waste disposal systems in rural areas. Funds may be used to finance the
acquisition, construction, or improvement of drinking water sourcing, treatment, storage,
and distribution; sewer collection, transmission, treatment, and disposal; solid waste
collection, disposal, and closure; and storm water collection, transmission, and disposal. In
some cases, funding may also be available for related activities such as legal and engineering
fees; land acquisition, water and land rights, permits and equipment; start-up operations
and maintenance; interest incurred during construction; and the purchase of facilities to
improve service or prevent loss of service. A 40-year maximum repayment period has been
set for the loans.
Economic Development Administration (EDA) – Public Works Program
EDA’s Public Works program helps distressed communities revitalize, expand, and upgrade
their physical infrastructure. This program enables communities to attract new industry;
encourage business expansion; diversify local economies; and generate or retain long-term,
private-sector jobs and investment through the acquisition or development of land and
infrastructure improvements needed for the successful establishment or expansion of
industrial or commercial enterprises. Through the program, EDA invests in traditional public
works projects, including water and sewer systems improvements, industrial parks,
business incubator facilities, expansion of port and harbor facilities, skill-training facilities,
and brownfields development.
Environmental Protection Agency
The Environmental Protection Agency makes low interest loans to communities to assist in
the construction of new or upgraded water and wastewater treatment facilities, through
the Water Infrastructure Finance and Innovation Act of 2014 (WIFIA).
J. State Funding
California Infrastructure and Economic Development Bank
This agency of the State of California offers a range of funding sources, including:
Clean Water State Revolving Fund (CWSRF)
The State Water Resources Control Board (SWRCB) is responsible for managing the state's
water resources and implementing programs to ensure the availability and quality of water
for California residents. One of the funding sources administered by the SWRCB is the Clean
Water State Revolving Fund (CWSRF). The CWSRF provides low-interest loans and grants to
assist communities in financing the planning, design, and construction of wastewater
treatment and water quality improvement projects.
The availability of CWSRF funding can significantly benefit the District in implementing
mitigation measures and wastewater facility upgrades outlined in the Service Area Plan
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
60
(SAP). This funding source can help finance critical infrastructure upgrades and mitigation
measures outlined in the SAP, contributing to the district's long-term sustainability and
compliance with regulatory requirements. Access to CWSRF funding can also enable the
development of higher capacity wastewater treatment facilities, which can, in turn,
accommodate population growth and expanding service areas.
The application process for CWSRF grants can be highly competitive and the availability of
funds may be limited. While CWSRF loans offer favorable terms, they are still loans that
need to be repaid and compliance with regulatory requirements is necessary to maximize
the benefits of CWSRF funding. The District must plan for the long-term financial
commitment associated with loan repayment. The CWSRF application review and approval
process can be time-consuming, which may delay project implementation.
Infrastructure State Revolving Fund
Special districts in California may obtain loans for a range of infrastructure, including:
• City streets
• County highways
• State highways
• Drainage, water supply and flood control
• Educational, cultural, and social facilities
• Environmental mitigation measures
• Goods movement-related infrastructure
• Parks and recreational facilities
• Public transit
• Sewage collection and treatment
• Solid waste collection and disposal
• Water treatment and distribution
• Public safety facilities
Eligible costs covered by the Infrastructure State Revolving Fund include:
• All or any part of the cost of construction, renovation, and acquisition of all lands,
structures, and real or personal property
• Rights, rights of way, franchises, licenses, easements, and interests acquired or
used for a project
• The cost of demolishing or removing any buildings or structures
• Cost of machinery and equipment
• Other expenses necessary for a project
• The soft costs associated with a project (including architectural, engineering, legal,
and related costs)
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
61
• Interest prior to, during, and for a period after, completion of construction,
renovation, or acquisition, as determined by the Infrastructure Bank
• Reserves for principal and interest and for extensions, enlargements, additions,
replacements, renovations, and improvements.
CLEEN Program: California Lending for Energy and Environmental Needs
The CLEEN Center provides direct public financing to help meet the goals of the State of
California for greenhouse gas reduction, water conservation and environmental
preservation. The CLEEN Center offers the Statewide Energy Efficiency Program (SWEEP)
and the Light Emitting Diode Street Lighting Program (LED). Financing through these
programs can be made through direct loans with the Infrastructure State Revolving Fund in
amounts from $500,000 to $30 million.
Eligible SWEEP projects could include:
• Advanced metering systems to support conversion of master-meter buildings to
sub-metering
• Data center, information technology, and communications energy efficiency
• Energy management and/or control systems, including continuous commissioning
• Demand response programs
• Water conservation, wastewater management, pipeline, mining / extraction and
similar end-use processes, facilities, buildings, and infrastructure
• Lighting and control systems
• Heating, ventilation, and air conditioning systems (HVAC)
• Building envelope improvements
• Occupant plug load management systems
• Other electrical load reduction
• Thermal and electric energy storage
The LED program helps to fund the installation of LED streetlights as another energy
efficiency strategy for the State of California.
Public Agency Revenue Bonds (PARBs)
The California Infrastructure and Economic Development Bank provides bond financing to
expand various programs of specific local government agencies for qualified purposes
including the construction of transportation and transit facilities, water and wastewater
systems, power generation and transmission systems, sewer systems, and related facilities.
Transformative Climate Communities
This Transformative Climate Communities (TCC) Program funds community-led
development and infrastructure projects that achieve major environmental, health, and
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
62
economic benefits in the state’s most disadvantaged communities. The TCC is funded by
California’s Cap-and-Trade Program, and eligible programs must reduce greenhouse gas
emissions significantly over time, leverage additional funding sources, and provide
additional health, environmental, and economic benefits. Examples of eligible projects
include, but are not limited to, the following:
• Bicycle and car share programs
• Water-energy efficiency installations
• Urban greening projects
• Bicycle and pedestrian facilities
• Health and well-being projects
The monitoring and reporting of TCC projects is conducted using a quantification
methodology certified by the California Air Resources Board.
Urban Greening Program
This program provides grant funding to disadvantaged communities for projects designed
to reduce greenhouse gas emissions. Eligible projects acquire, create, enhance, or expand
community parks and green spaces, and/ or use natural systems (or systems that mimic
natural systems) to achieve multiple benefits.
K. Lease Financing
Instead of purchasing or issuing bonds, agencies can enter into a lease agreement to acquire
and dispose of property. Generally, one or two types of lease agreements is entered. The
first type is a “lease-purchase” agreement, where an agency leases a facility while
purchasing it. The second type is a “sale-leaseback” agreement, where a facility is sold to a
lessor by an agency, which immediately leases the facility back to the agency. Leases are
designed to be tax-exempt investments and a properly constructed lease is not considered
a public debt. Lease financing requires finding an investor or group of investors to invest in
the return from the agency’s lease payments.
Certificates of Participation
Certificates of participation (COPs) have become a popular financing method for cities,
counties, school districts, and other public entities. They offer officials a way to obtain
funding to build capital improvement projects without having to obtain a vote of the public,
while complying with California debt limitation laws. All certificates of participation are
structured so that the ownership of the project being financed is vested in a third party
entity that then leases the project back to the district, thus providing the district the use of
the project in return for lease payments from its general fund. The third party entity assigns
the lease payments on the project to a trustee, who then remits the lease payments to
investors in the COPs. The COPs are ultimately sold to investors.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
63
If projects are too small to attract investors or to be feasible for lease financing, local
agencies can pool COPs. Pooling COPs allows agencies to minimize the costs of initiating and
issuing a COP and may reduce the interest required to be paid on the lease. Entities involved
with a pooled COP must form a Joint Powers Authority to oversee the pooled COP.
L. Channel Maintenance Fund
Channel Maintenance services were historically provided by the District and included in past
Service Area Plans, prior to 2006. All Channel Maintenance Funds that were held by the
District were released to three (3) HOA’s that oversee the channels, the HOA’s are as
follows; Riviera keys Property Owners Association, Bahia Del Mar Estates Property Owner’s
Association, and Pelican Island Property Owner’s Association. The District plans to renew
the Channel Maintenance Fund next fiscal year (2023-2024) to aid with an upcoming project
in Desert Shores. The Channel Maintenance Fund is a self-financed program which should
be fully funded by user fees. The District’s self-financed programs are to be fully funded by
the user fees including; overhead, equipment replacement, debt financing, transfers to
reserves and capital expenditures.
Facility Financing
The following list presents sources of revenue that are currently utilized by the Salton Community
Services District to accumulate finances necessary to develop and operate the various facilities and
services discussed within the Service Area Plan.
A. Administrative Facilities
Current Funding
The District does not maintain a separate budget line item pertaining to Administrative
Facilities. Instead, Sewer Maintenance Funds (SM) pay for and fund all items associated with
the District office building. Property taxes are not used to fund the District office building.
Instead, the District office building funded by sewer user fees and rental income.
Cost Avoidance Opportunities
In order to reduce administrative service costs, the District completes most maintenance
and repairs in-house prior to taking them out for bid. The District also takes part in the
Special District Risk Management Authority (SDRMA) Credit Incentive Program, which can
provide credit incentives of up to 15 percent towards Property and Liability and Workers
Compensation Programs.
Recommended Funding
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
64
In addition to the continued use of existing funding sources, development impact fees may
be established to help fund demand for future administrative facilities created by future
development. If additional funding is needed, General Obligation Bonds may be issued, or
a community facilities district can be formed.
B. Wastewater Facilities
Current Funding
The primary sources of revenue for wastewater treatment and collection facilities are the
sewer capacity and connection fees for new developments along with yearly sewer user
fees. Other sources of revenue are from interest income on accounts and equipment
rentals.
Cost Avoidance Opportunities
In order to reduce wastewater treatment facility and capital improvement costs, the District
completes most repairs in house and maintains a qualified staff for maintenance purposes
without having to seek outside assistance.
The primary advantage of the Clean Water State Revolving Fund (CWSRF) program is access
to low-interest loans. These loans often offer significantly lower interest rates than
traditional financing options, which can result in substantial cost savings over the life of a
project. In addition to loans, some portions of CWSRF funding may be available as grants.
These grants do not need to be repaid and can provide essential financial assistance for
projects.
Recommended Funding
The current fee structure will need to be reviewed periodically and during any proposed
annexations in the future to ensure that there is sufficient funding to provide wastewater
service to new developments. The Salton Community Services District Sewer Rate Study
recommended an increase in sewer rate charges of 30 percent in the first year, followed by
incremental increase of 4 percent in subsequent years for rate fees so that the system
becomes financially viable, without causing undue burden on customers. Funding
responsibilities for project-related facilities shall remain with the developers and secured
prior to construction.
The District is eligible to apply for the CWSRF to finance wastewater system improvement
projects recommended in the PER. Alternative state and federal grant and loan programs
are available such as USDA Water and Waste Disposal Loans and Grants for Public Works
and Infrastructure Development. The District should consider these programs for additional
assistance in providing for adequate wastewater facilities to the residents of the District.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
65
C. Fire Facilities
Current Funding
The District fire department personnel resigned from their positions upon the rejection of
the Fire Protection Parcel Tax. This made the District lose authority to provide fire
protection services to the County due to not having enough funding to operate and
maintain the fire department. Imperial County began providing fire protection services to
the Service Area in November 2019. To this date (2022), Imperial County has not scheduled
or reached out to the District regarding payment toward fire protection services they are
providing. The District Board has approved donating the District’s fire truck to Imperial
County.
Cost Avoidance Opportunities
To reduce fire protection services costs, the District and Imperial County maintain an
agreement for fire dispatch services.
Recommended Funding
The District should cooperate with the County in providing the necessary buildings,
machinery and equipment for the County Fire Department to continue providing fire
protection services to the Service Area. The District should seek long-term solutions and
reach an agreement with the County to sustain services.
D. Parks and Recreational Facilities
Current Funding
Parks and Recreation funding comes from the General Fund, park fees, California State
Parks Grants, and interest on these grants. Park fees generally consist of the following:
green fees, pass fees, and tournament fees for golf course users; pool fees, and pool pass
fees for Salton Community Pool users; and launch ramp fees for users of the boat launch.
Cost Avoidance Opportunities
The District employs just one person for the maintenance and operation of all parks in the
District. By prioritizing the daily and routine demands of individual facilities, the District is
able to minimize maintenance costs.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
66
Recommended Funding
Current funding sources for parks and recreation should continue to be used. In addition, it
is essential that the District require developers of new residential developments to dedicate
park land and/or pay development impact fees for the improvement and expansion of
existing park and recreational facilities.
E. Sanitation / Solid Waste Disposal
Current Funding
Burrtec performs all residential, commercial, industrial, construction, and roll-off billing per
the conditions of the solid waste agreement signed by the District. Funding comes from a
direct cost billed to the end user. Effective 2021 residential rates average $75.15 per three
months of service. Commercial rates are conditional on the frequency of collection and
container size.
Cost Avoidance Opportunities
Burrtec provides collection services to District facilities including the District office, fire
stations, parks, and maintenance yard at no charge to the District.
Recommended Funding
The District may by resolution or ordinance require that all residences subscribe to curbside
solid waste collection services. This may provide more of a volume sales price to all
residential customers, but would not provide any foreseeable income to the District.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
67
5. AVAILABILITY OF SERVICES NOT PROVIDED BY THE DISTRICT
Introduction
As indicated in the previous sections, the provision of services to the population of the Salton
Community Services District is shared with other agencies. This section addresses the availability of
services not provided by the District.
Law Enforcement
Law enforcement is provided by the Imperial County Sheriff’s Department, which is divided into Patrol
Divisions. The North County Patrol Division is headquartered in Brawley and services Bombay Beach,
Niland, Palo Verde, Salton City, and rural areas of Brawley, Calipatria, and Westmorland. The
department includes two full time sheriff’s officers serving the Salton Community Services District area.
Because of the large coverage area of the sheriff’s department, no specific response time goals exist.
Deputies try to keep response times at a minimum and are monitored for improvements in service. Law
enforcement services are financed via the general fund.
Water Services
The Coachella Valley Water District (CVWD) is a public agency, established by voters in 1918, that
provides irrigation water and agricultural drainage, domestic water, wastewater treatment and recycled
water, regional stormwater protection, groundwater management and water conservation across 1,000
square miles, primarily in Riverside County, but also in portions of Imperial and San Diego counties.
CVWD provides urban water to most of the Coachella Valley and along both sides of the Salton Sea in
the Imperial Valley. CVWD’s domestic water service area includes a population of around 290,000
people, stretching from Cathedral City to the Salton Sea. The CVWD operates 95 active wells to meet
the needs of the more than 108,000 homes and businesses within its service boundary. The entire Salton
Community Services District falls within the boundary of CVWD services. The agency obtains domestic
water from its own aquifer system. Its water is pumped from wells up to 1,200 feet deep and stored
until needed in more than 63 distribution reservoirs. A network of nearly 2,015 miles of distribution
piping delivers the domestic water to end users.
An ongoing concern of the District is the ability of a privately-built delivery system, which dates to the
late 1950s and early 1960s, to provide water to new residents in the western Salton Sea communities.
The District is located within the CVWD’s Improvement District No. 11 (ID-11). The CVWD’s domestic
water supply for the ID-11 distribution system is located at the County Line Well Field on Avenue 86 on
the west side of Highway 86. The CVWD is currently planning a $2.1 billion water pipeline to the local
area that should solve most of the water capacity problems in the vicinity of the Salton Community
Services District and accommodate additional growth in the area.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
68
Electricity
The Imperial Irrigation District (IID), a community-owned utility, provides irrigation water and electric
power to the lower southeastern portion of California’s desert. Once electricity leaves the power plant
it becomes part of the transmission system and gets carried to local substations. All homes and
businesses are served from one of several substations within the District. The IID policy is to extend its
electrical facilities to those developments that have obtained the approval of the District or
governmental authority having jurisdiction over said developments.
IID has promoted and expanded its renewable energy programs significant over the last decade. The
organization launched a community solar project for low-income communities in its service area in
2019, serving 12,000 customers in economically distressed areas. Many of IID’s customers have seen
their monthly electric bills reduced under IID’s Residential Energy Assistance Program and the District’s
eGreen Program. The program provides annual savings of over $1 million annually to low income
customers in the district. Energy from renewables accounted for 31 percent of all electric energy
produced by IID in 2019, and energy from geothermal sources represented 13 percent of IID’s total
energy load. IID continues to explore how to expand renewable energy operations in the Salton Sea
area, including exporting energy to other areas across the country and in Mexico.
Additions or upgrades of electric facilities is dependent upon the requirements of new development.
Coachella Valley School District
The District is served by the Coachella Valley United School District (School District). This School District
is based out of Riverside County, but also has facilities within Imperial County. It encompasses 1,200
square miles of rural farmland and desert and includes over 17,200 students. The School District
operates 21 schools: 14 elementary schools that serve Transitional Kindergarten through 6th Grade;
three middle schools (serving 7th and 8th grades); one high school serving 7th through 12th grades; two
comprehensive high schools serving 9th through 12th grades; and one continuation high school serving
adult learners. The schools are located throughout Coachella, Thermal, Mecca, Indio, and Salton City.
Around 40 percent of students in the district are English language learners, 11 percent are migrant
students, and 90 percent of students qualify for free or reduced lunch programs.
Within the District are Sea View Elementary, which serves children from grades K-6, and West Shores
High School, which services grades 7-12. The high school is located at 2381 Shore Hawk in Salton City
and the elementary school is located at 2381 Sea Hawk Avenue, Salton City, CA 92274. West Shores
High School has an enrollment of 357 students for the 2020-21 school year, and Sea View Elementary
has an enrollment of 612 students for the 2020-21 school year. Both of these school facilities are
relatively new, and it does not appear that the district has capacity issues in serving additional students
in the Salton CSD area.
SALTON COMMUNITY SERVICES DISTRICT SERVICE AREA PLAN REVISED SEPTEMBER 2023
69