LAFCO
Muir Beach Area Service Review and Sphere of Influence Update- October 2007
Read the report at Local Agency Formation Commissions ↗
MUIR BEACH AREA
SERVICE REVIEW AND
SPHERE OF INFLUENCE UPDATE
Marin Local Agency Formation Commission
October 2007
Peter Banning, Executive Officer
Evelyn Ellis, Assistant Planner
Candice Bozzard, Commission Clerk
165 North Redwood Drive, Suite 160
San Rafael, California 94903
ACKNOWLEDGEMENT
The staff of Marin LAFCO gratefully acknowledges the time and effort of the
County of Marin and Muir Beach Community Services District who provided
information and insight during the preparation of this report.
I. INTRODUCTION
This report is presented as part of a process mandated by Section 56425 of the
Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. As
stated in that section, “In order to carry out its purposes and responsibilities for
planning and shaping the logical and orderly development and coordination of
local government agencies so as to advantageously provide for the present and
future needs of the county and its communities, the Local Agency Formation
Commission shall develop and determine the sphere of influence of each local
governmental agency within the county.” As used in this section, “sphere of
influence” means a plan for the probable physical boundaries and service area of
a local government agency.
In determining a sphere of influence, the Commission is required to consider and
make written findings with respect to the following factors:
❑ The present and planned land uses in the area, including agricultural and
open space lands.
❑ The present and probable need for public facilities and services in the area.
❑ The present capacity of public facilities and adequacy of public services
which the agency provides or is authorized to provide.
❑ The existence of any social or economic communities of interest in the area
if the commission determines they are relevant to the agency.
Changes to State law effective on January 1, 2001 require LAFCOs to study the
service relationships between agencies providing municipal services within
different sub-regions in each county prior to the periodic review of adopted
spheres of influence. In this report, discussion of service review determinations
precedes recommendations for the sphere of influence of the public agency
under study, the Muir Beach Community Services District.
The actual effect of these or any other adopted spheres of influence will be to
provide LAFCO and local communities with policy guidance on matters relating
to the boundaries and organization of local government agencies. In short, the
purpose of the Commission’s sphere determinations is to answer the question,
“What local agencies should provide which services to what geographical area as
communities change?” More information on LAFCO and on all of Marin
County’s local governments, services and boundaries may be found on the
Commission’s website at www.lafco.marin.org.
II. MUNICIPAL SERVICE REVIEW
Description of Community
The unincorporated residential community of Muir Beach is located in the
southwestern part of Marin County. It is bounded on the west by the Pacific
Ocean, on the east by Highway 1, and on the north and south by Federal park
land under the Golden Gate National Recreation Area (GGNRA). The main
access is through Highway 1.
Description of District
The Muir Beach Community Services District (MBCSD) was formed in 1958
under Section 61600 and 61601 et seq. of the California Government Code.
The district is responsible for fire protection; water distribution, supply and
treatment; road and access easement maintenance; and recreation. A five-
member Board of Directors, elected at-large, governs the MBCSD. A District
Manager is responsible for administrative functions.
The MBCSD is located within the community of Muir Beach and encompasses
approximately 820 acres. Properties include the Muir Beach residential area,
Green Gulch Zen Center agricultural lands, Pelican Inn, and public lands of
GGNRA (including Muir Beach). The MBCSD’s boundaries and sphere of
influence are coterminous. A map of the MBCSD and its sphere are included on
Map 1.
Water System
The water system is owned and operated by the MBCSD, which was established
following a voter petition and approval in 1958. The purpose for the District’s
formation was to take over the assets of the Muir Beach Water Company, which
had been formed in 1928, to furnish water to the original Bello Beach Subdivision
properties. In 1970, the District acquired the assets of the Seacape Mutual Water
Company, which served the Seacape Subdivision properties.
Muir Beach Area
Service Review
July 2007
MUIR WOODS NATIONAL MONUMENT
Marin Local Agency
Formation Commission
MT. TAMALPAIS STATE PARK
Map 1
Muir Beach Community
Services District
Legend
Muir Beach Volunteer Fire Station
Muir Beach Community Services
District Office and Community Center
Parcel Boundary
Muir Beach Community Services District
GOLDEN GATE NATIONAL RECREATIONAL AREA
PACIFIC
Prepared by:
COUNTY OF MARIN
COMMUNITY DEVELOPMENT AGENCY MAPPING/GRAPHICS
OCEAN f L o O r C th A e L : AGENCY FORMATION COMMISSION
JULY 2007 FILE: MUIR_BEACH_SVC_REV.MXD
THIS MAP IS REPRESENTATIONAL ONLY. DATA ARE NOT SURVEY PRECISE.
0 0.25 0.5Miles
Muir Beach Area Service Review & 3 October 2007
Sphere of Influence Update
The current distribution system is divided into two service zones. The High Zone
serves the uphill properties of the Seacape Subdivision and the Low Zone serves
the properties of the Bello Beach Subdivision. The combined High Zone and Low
Zone systems have a total of 147 water services, including two commercial
services; one service to the MBCSD Community Center; one service to the State
Park lands on Frank Valley Road; one service to the Muir Beach public park area;
and 142 individual residential meters. 1
A major engineering study and evaluation of the District’s complete system was
conducted in 1987 by Harris Consultants, Inc. in response to concerns regarding
the marginal water quality, system reliability and fire flow capacity. The failure
of one of the two Low Zone redwood storage tanks awakened the residents to
the fact that the water system had severe problems. This evaluation included a
review of water supply requirements for domestic use and fire protection, the
condition and adequacy of the well supply, water storage requirements and
alternatives, the physical condition and hydraulic adequacy of the transmission
and distribution system, and a review of water quality.
Since that study, a 20 Year Plan for Water System Capital Improvements (1997-
2017) was written in joint by Henry Hyde and Associates and the Associated
Business and Community Consultants, Inc. This study laid out the needed
capital improvements schedule for the water system including funding
mechanisms.
Fire Protection Services
The Muir Beach Volunteer Fire Department (MBVFD) is a department of MBCSD
and is a 16 person, 100% volunteer department. The MBCSD allocates funds to
the MBVFD. Additional funds are raised by the Fire Department. It also receives
monies from the federal government for its assistance in fire protection in the
surrounding public lands.
The Muir Beach Volunteer Fireman’s Association (MBVFA) is responsible for
generating and managing funding for the MBVFD. It has an eight person Board
which is also 100% volunteer. There are neither paid administration nor support
personnel. All volunteers operate from their homes using their own personal
equipment and supplies. Other than the MBVFD Station House provided by the
U.S. National Park Service, there are no facilities operated by the Department.
1 Muir Beach Community Services District, Twenty Year Plan for Water System Capital Improvements,
1997-2016, Henry Hyde and Associates, Associated Business and Community Consultants, Inc. Section 1,
Page 1
Muir Beach Area Service Review & 4 October 2007
Sphere of Influence Update
The fire service responsibilities have expanded dramatically since the inception
of the volunteer fire department. In addition to training for structural fires, the
MBVFD volunteers are also trained to respond to wildland fires, medical
emergencies, vehicle accidents, biking and hiking accidents, floods, mudslides,
earthquakes, even chemical and biological emergencies. The response area
includes Muir Beach, Green Gulch Farm, Slide Ranch, Muir Woods National
Monument, and Mt. Tamalpais State Park. Many of the incidents involve tourists
unfamiliar with twisty Highway 1.2
Municipal Service Review Determinations for Muir Beach Community
Services District
This report addresses the Municipal Service Review factors specified in LAFCO’s
governing statute.
1. Government and Operations Structure
A Technical Advisory Committee completed the Adaptive Management Plan for
Well Operations and Water Conservation in 2003 (adopted in 2005) and looked at
alternative water sources including relocation of the District’s wells, importation
of water from MMWD, water reclamation, and desalination.
The conclusion of this portion of the study stated that due to the District’s small
size (less than 160 water services) and income potential limits its ability to fund
significant costs for providing alternative water facilities and increase water
storage. For this reason, it was generally agreed that if and when such
improvements are to be done, the funding will be from sources outside the
District, including but not limited to grant sources.
The closest option to providing service outside the district boundary would be to
expand service to Muir Woods National Park, currently served by Marin
Municipal Water District. This would not be feasible due to the demands on the
limited water supply would exhaust the otherwise generous safety margin
between capacity and actual usage. However, it might be useful to extend the
boundary up Muir Woods Road (0.5 mile) to include the District’s well sites. 3
According to the Marin LAFCO Special District Sphere of Influence Study
written in 1984, no alternative government structures are feasible for either the
water system or fire department.
2 Muir Beach Volunteer Fire Department website; http://www.muirbeachfire.com/about.html
3 Leighton Hills, District Manager, Questionnaire and Data Request, 6/12/07
Muir Beach Area Service Review & 5 October 2007
Sphere of Influence Update
2. Infrastructure Needs and Deficiencies
Water System
According to the Twenty Year Plan for Water System Capital Improvements
(1997-2016), the Muir Beach water system is comprised of the following major
components:
• Two wells (drilled in 1996 and 2002) located at Santos Meadow between
California State Parks and GGNRA on MBCSD property adjacent to Frank
Valley Road. The wells draw from an aquifer that flows parallel to Redwood
Creek, flowing from Muir Woods to the ocean.
• Chlorination, booster pumping and metering facilities. These are located in a
small building adjacent to the wells that also serves as a District office.
• A four inch transmission main running from the wells to the service area.
• A 150,000 gallon redwood storage tank serving the high zone of the system.
The high zone tank is located on Seacape Drive adjacent to the Muir Beach
Overlook.
• A 100,000 gallon redwood storage tank serving the low zone of the system.
The low zone tank is located adjacent to a private road extending from the
cul-de-sac at the end of Starbuck Drive.
For infrastructure replacement, MBCSD staff has contracted with outside
consulting engineering firms to develop and prioritize recommendations for
capital improvements.
Fire Department
The MBVFD owns and maintains engine 676, a donation from the County, with
capabilities of fighting wildland and structural fires. Also owned and maintained
at that location is apparatus 606, a 4-wheel drive with squad capabilities. All
equipment in support of those vehicles, such as turnouts, hoses, nozzles,
medical, air tanks, is maintained in the Department’s single fire house.
The MBVFD and the MBVFA are working with the U.S. National Park Service
(USNPS) to relocate the MBVFD fire house from the inadequate dairy building to
the adjacent barn. If this arrangement can be made with the USNPS, then the
cost of retrofitting the barn will be substantial.
The MBVFD is trying to replace its antiquated and deteriorating squad truck to
provide its volunteer firefighters with safer and more effective quick attack
Muir Beach Area Service Review & 6 October 2007
Sphere of Influence Update
capabilities. The cost of this fire squad truck replacement is approximately
$150,000
The MBVFD and MBVFA have developed, with the support of grant funds, a
substantial fuel abatement program for the wildland-urban interface location.
This service requires ongoing funding for the operation, maintenance,
replacement and acquisition of the required equipment.
The MBVFD and the MBVFA are working with the Muir Beach residents and the
neighboring communities of West Marin to develop an emergency/disaster
preparedness program, including shelters, training, supplies and equipment to
respond to a long-term isolating event. This service requires ongoing funding
for the operation, maintenance, replacement and acquisition of the required
equipment.
The MBVFA in collaboration with the MBVFD has developed a 20 year long-
range needs analysis that includes all infrastructure and service needs. This
long-range budget is then annualized with operating items budgeted for one
year, capital and non-consumable items budgeted for up to 20 years (e.g., fire
truck, ladders). This long-range budget is re-evaluated and adjusted annually.
At this time, all non-consumable and capital acquisitions are made with grant
funds and donations.
3. Growth and Population Projections
Based on the 2000 U.S. Census information, the Muir Beach CDP (Census
Designated Place) planning area had a population of approximately 295.
According to the Marin County Community Development Agency, there were
144 existing units in 2005. It is projected that there will be 31 additional units by
2030 with 13 of them being second units. The 2030 total buildout projection is 175
units. The estimated maximum population projection (2030) is 389, an increase of
31.9% with no accounting for constraints on water capacity.
The District’s service area is prevented from expansion as it is surrounded by
federal and state park lands and agricultural preserves. According to the Marin
County Local Coastal Plan, the Muir Beach area will experience limited
expansion of its single-family residential housing.
Muir Beach Area Service Review & 7 October 2007
Sphere of Influence Update
4. Financing Constraints and Opportunities
Water System
Since 1997, the MBCSD sought to impose an annual parcel tax to fund capital
improvements to its water system. In November 2005, they sought an extension
of four years for $300 per household (and $3,250 per commercial property). It
required 66.67 percent (2/3) approval and the measure won with 87 percent of
the vote. This new rate will remain in effect for four years. Due to this parcel tax,
the district now has a reserve account balance of over $400,000 (FYE 05/06).
Fire Department
With 148 homes and 295 residents, Muir Beach is one of the smallest
communities in the area. Because MBVFD is not a fire district, residents do not
pay taxes to support its operation. As a result, the Muir Beach Volunteer
Firemen's Association was founded in 1994 to raise money for training,
equipment and operations. The annual Memorial Day barbeque, grants, and
donations from neighboring fire districts and members of the community are the
principal sources of funds.
There has been a significant increase in the fire department’s annual budget due
to the following factors:
• California legislation now requires volunteer fire departments to provide
equipment, training and proficiency levels equal to the State’s paid
firefighting units.
• MBVFD recently added emergency preparedness ($8,750/year) and fuel
abatement programs ($11,250/year) to its list of responsibilities.
• Currently, there are no regular funding sources to replace major capital
equipment used by the volunteers (two fire trucks, chipper, splitter,
tractor and trailer). Both fire trucks have outlived their 20 year life
expectancy. At least $35,000 needs to be set aside annually for funding to
replace capital equipment. 4
With this increase in the budget, funds raised by the fire department are not
adequate anymore. The MBVFD is proposing a $200 annual parcel tax to help
fund fire service responsibilities for Muir Beach. A ballot to impose a special tax
will be submitted to the voters in November, 2007.
4 Tax Assessment Overview, Fire Department website: http://www.muirbeachfire.com/news.html
Muir Beach Area Service Review & 8 October 2007
Sphere of Influence Update
However, should the $200/year assessment be rejected, the Emergency
Preparedness and Fuel Abatement projects would be abandoned and there
would be no funding for equipment replacement. In the long term it is possible
that the MBVFD could be disbanded and firefighting responsibilities would be
reassigned to the County’s Throckmorton Ridge Fire Station.
5. Cost-Avoidance Opportunities
Staff has not identified significant cost avoidance opportunities in fire or water
services in the Muir Beach study area that could result from annexations
anticipated by adopted spheres of influence or other changes in the relationships
between local agencies.
6. Opportunities for Rate Restructuring
Water System
Revenue sources for water service for FY 2005/06 came from water fees
($88,388); property taxes ($70,776 plus ERAF of $19,817); voter-approved parcel
tax of $300 per year for water capital improvements ($52,703); and investment
income ($17,863).
All water customers (residential and commercial) are charged per the same rate
schedule.
Fire Department
MBCSD allocates approximately $2,800 of its budgeted $71,000 of property taxes
to the fire department. The total fire service revenues from events, grants and
donations were $31,000 in FY 2005/06. Other revenues were from investment
income ($2,800). See page 7 for information on possible future changes in the fire
budget due to proposed parcel tax.
7. Opportunities for Shared Facilities
MBCSD has arrangements with the US National Park Services to use its dairy
facility at Muir Beach to house the MBVFD fire trucks and equipment. They have
a contract with the USNPS for mutual aid and informal mutual aid agreements
with Stinson Beach Fire District and Southern Marin Fire. They share purchasing
opportunities with County Fire, Stinson Beach Fire District and Bolinas Fire
District. They receive Worker’s Compensation insurance through County Fire of
Marin.
Muir Beach Area Service Review & 9 October 2007
Sphere of Influence Update
The MBVFD provides mutual aid to the neighboring parklands and
communities.
8. Management Efficiencies
Budget and other documents published by MBCSD are generally informative on
the nature of services, allocation of resources to those services, performance
measures, and projections. The documents are written in plain language for a
general audience with an affirmative effort to keep the Muir Beach community
informed.
Since the 20 year water capital improvement plan was written and has been
implemented, services have improved dramatically and an adequate reserve
fund has developed.
9. Local Accountability and Governance
The MBCSD is the governing agency responsible for fire protection and therefore
emergency services for the Muir Beach area. The MBVFA is governed by an
eight person Board of volunteers who help raise funds for fire services through
fundraising events, donations, and grants.
III. SPHERE OF INFLUENCE REVIEW AND UPDATE
Description of Current Sphere of Influence
The Muir Beach Community Facilities District is located in the western part of
Marin County. It is bounded on the west by the Pacific Ocean, on the east by
Shoreline Highway, and on the north and south by Federal parkland under the
GGNRA. Properties include the Muir Beach residential area, Green Gulch Zen
Center agricultural lands, Pelican Inn, and public lands of GGNRA (including
Muir Beach).
The boundaries and sphere of influence of MBCFD are coterminous. A map of
the district and its sphere is shown on page 2.
Service Relationships
Table 1 summarizes the sources of municipal services for the Muir Beach area.
Table 1. Sources of Municipal Service: Muir Beach Area
Area Police Fire/Emergency. Water Wastewater Solid Waste Comm. Street Parks & Library
Medical Disposal Development Maintenance Recreation
Muir County Muir Beach CSD Muir On-site Waste County County County County –
Beach Sheriff CSA #31 Beach Management no local
Area CSD branch
The Muir Beach area receives fire and water services from Muir Beach
Community Services District as well as mutual aid fire services from County Fire
with the nearest county fire station on Throckmorton Ridge. The residences in
the Muir Beach area are on septic systems for wastewater disposal. Library
services are available through the County, with the nearest branch library located
in Stinson Beach. A County public library is also located in Mill Valley on
Throckmorton Avenue. Muir Beach has a wide range of recreational
opportunities available to residents from Federal, State, and County park
facilities.
Muir Beach Area Service Review & 11 October 2007
Sphere of Influence Update
Need/Demand for Services
Existing and potential housing units and population for the Muir Beach area is
shown in Table 3.
Table 3. Estimated Population and Development Potential – Muir Beach Area
2005 2030 % Potential
Existing Buildout Estimated Area
Land Area 2000 Housing Housing Maximum Population
(acres) Population Units Units Population Increase
Muir Beach Area 345 295 144 175 389 31.9%
Note: Muir Beach Area 2030 Buildout based on Countywide Plan scenario most likely to be adopted. Second unit
projection is based on State and local policy.
The 2000 population of the greater Muir Beach area was approximately 295
within a land area of 345 acres. According to the Marin County Community
Development Agency, there is currently 144 housing units with a future
development potential of 31 additional units (which includes 13 second units),
with maximum population of 389 under current zoning designations.
Ability to Extend Services
Muir Beach is entirely an unincorporated area whose effective boundaries for fire
protection are permanently defined by the surrounding state and federal
parklands. Consequently, they are a critical wildland-urban interface area that
must pro-actively address an abundant and increasing fuel load, in concert with
District resources, County, State and Federal agencies. Because of the limited
resources of the District, responsibility for areas beyond the immediate
boundaries of the District falls largely on the County, State and Federal agencies.
Due to limitations of equipment, volunteer training program, and full-time
personnel, fire protection service capacity is below desired levels, especially
during the dry months.
MBCSD’s water system provides services to a very small area (147 connections)
within the District’s boundary. Low water supplies indicate expansion of
capacity may be needed in order to accommodate future growth.
Muir Beach Area Service Review & 12 October 2007
Sphere of Influence Update
City and County General Plans
The Muir Beach Community Plan was prepared pursuant to the requirements of
the California Coastal Act and the Marin County Local Coastal Program. This
plan was completed in 1978.
At the time the Community Plan was written, it was shortly after the drought of
1975-77 which caused a severe water shortage in Marin County. During this
time, Muir Beach CSD saw the reality of a limited supply of water from
Redwood Creek. The plan states that it is the responsibility of MBCSD to
educate the community in water conservation and it is the policy to discourage
the sale of water outside the boundaries of the District or to enlarge the
boundaries. Also, because of potentially negative impacts on water supply,
recreational development in Frank Valley is strongly opposed.
The policies of the Local Coastal Program and the Marin Countywide Plan are
aimed at preserving the physical integrity of the coastal villages, keeping them
from expanding into the agricultural lands and other open spaces designated for
preservation. Because there is no potential for additional visitor-serving uses in
Muir Beach, additional water use is limited to the build out of the residential lots
and increased demand from the beach park.
Recommendation
Staff recommends that the Commission affirm the current coterminous sphere of
influence designation for the Muir Beach Community Services District based on a
lack of advantage of organizational alternatives, on the public ownership of all
surrounding territory and lack of water supply to support extension of service
beyond existing district boundaries.
Consider extending the boundary up Muir Woods Road (0.5 mile) to include
the District’s well sites. Is this something to consider? It was noted by the
manager in data request.