PREFACE
This Municipal Services Review (MSR) documents and analyzes services provided by local
governmental agencies that are providing wastewater collection and/or treatment in the central
corridor of Marin County. Specifically, it evaluates the adequacy and efficiency of local
government structure and boundaries within the regions and provides a basis for boundary
planning decisions by the Marin Local Agency Formation Commission (LAFCo).
Context
Marin LAFCo is required to prepare this MSR in accordance with the Cortese-Knox-Hertzberg
Local Government Reorganization Act of 2000 (Government Code §56000, et seq.), which took
effect on January 1, 2001. The MSR reviews services provided by public agencies—cities and
special districts—whose boundaries and governance are subject to LAFCo. The analysis and
recommendations included herein serve to promote and coordinate the efficient delivery of local
government services and encourage the preservation of open space and agricultural lands.
Commissioners, Staff, Municipal Service Review Preparers
Commissioners
Barbara Coler – Chair City Town of Fairfax
Dennis Rodoni – Vice Chair County District 4 Supervisor
Eric Lucan County District 5 Supervisor
Larry Chu Public Commission
Lew Kious Special District Almonte Sanitary District
Craig Murray Special District Las Gallinas Valley Sanitary District
Steve Burdo City Town of San Anselmo
Roger Smith Public Alternate Commission
Cathryn Hilliard Special District Alternate Southern Marin Fire Protection District
Rachel Farac City Alternate City of Novato
Stephanie Moulton-Peters County Alternate District 3 Supervisor
Staff
Jason Fried Executive Officer
Jeren Batchelder-Seibel Deputy Executive Officer
Claire Devereux Clerk/Junior Analyst
MSR Preparers
Jeren Batchelder-Seibel Deputy Executive Officer
Marin LAFCo i Central Marin Wastewater Study
Final February 2025
Table of Contents
1.0 INTRODUCTION ............................................................................................................................. 7
1.1 ROLE AND RESPONSIBILITY OF LAFCO ..................................................................................... 7
1.2 MUNICIPAL SERVICE REVIEWS .................................................................................................. 8
1.3 MARIN LAFCO COMPOSITION ................................................................................................... 9
2.0 EXECUTIVE SUMMARY ............................................................................................................. 10
2.1 AFFECTED PUBLIC AGENCIES .................................................................................................. 10
2.2 PLANS, POLICIES, STUDIES ....................................................................................................... 10
2.3 AGENCY AND PUBLIC PARTICIPATION ...................................................................................... 11
2.4 WRITTEN DETERMINATIONS .................................................................................................... 12
3.0 DETERMINATIONS ...................................................................................................................... 14
4.0 RECOMMENDATIONS ................................................................................................................ 18
5.0 REGIONAL SETTING ................................................................................................................... 21
6.0 CENTRAL MARIN SANITATION AGENCY ............................................................................ 23
6.1 OVERVIEW ............................................................................................................................... 23
6.2 FORMATION AND DEVELOPMENT ............................................................................................. 23
6.3 SERVICE AREA ......................................................................................................................... 25
6.4 GROWTH AND POPULATION ...................................................................................................... 26
6.5 MUNICIPAL SERVICES .............................................................................................................. 26
6.6 ORGANIZATION STRUCTURE .................................................................................................... 29
6.7 ACCOUNTABILITY AND TRANSPARENCY ................................................................................... 32
6.8 FINANCIAL OVERVIEW ............................................................................................................. 33
7.0 MURRAY PARK SEWER MAINTENANCE DISTRICT ......................................................... 36
7.1 OVERVIEW ............................................................................................................................... 36
8.0 ROSS VALLEY SANITARY DISTRICT ..................................................................................... 37
8.1 OVERVIEW ............................................................................................................................... 37
8.2 FORMATION AND DEVELOPMENT ............................................................................................. 37
8.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE ................................................................... 40
Marin LAFCo ii Central Marin Wastewater Study
Final February 2025
8.4 GROWTH AND POPULATION ...................................................................................................... 40
8.5 MUNICIPAL SERVICES .............................................................................................................. 42
8.6 ORGANIZATION STRUCTURE .................................................................................................... 44
8.7 ACCOUNTABILITY AND TRANSPARENCY ................................................................................... 44
8.8 FINANCIAL OVERVIEW ............................................................................................................. 45
9.0 SAN RAFAEL SANITATION DISTRICT ................................................................................... 48
9.1 OVERVIEW ............................................................................................................................... 48
9.2 FORMATION AND DEVELOPMENT ............................................................................................. 48
9.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE ................................................................... 50
9.4 GROWTH AND POPULATION ...................................................................................................... 51
9.5 MUNICIPAL SERVICES .............................................................................................................. 52
9.6 ORGANIZATION STRUCTURE .................................................................................................... 52
9.7 ACCOUNTABILITY AND TRANSPARENCY ................................................................................... 54
9.8 FINANCIAL OVERVIEW ............................................................................................................. 55
10.0 SANITARY DISTRICT NO. 2 OF MARIN COUNTY ............................................................. 58
10.1 OVERVIEW.............................................................................................................................. 58
10.2 FORMATION AND DEVELOPMENT ........................................................................................... 58
10.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE ................................................................. 61
10.4 GROWTH AND POPULATION .................................................................................................... 62
10.5 MUNICIPAL SERVICES ............................................................................................................ 63
10.6 ORGANIZATION STRUCTURE .................................................................................................. 64
10.7 ACCOUNTABILITY AND TRANSPARENCY ................................................................................. 64
10.8 FINANCIAL OVERVIEW ........................................................................................................... 65
11.0 SAN QUENTIN VILLAGE SEWER MAINTENANCE DISTRICT ....................................... 68
11.1 OVERVIEW.............................................................................................................................. 68
11.2 FORMATION AND DEVELOPMENT ........................................................................................... 68
11.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE ................................................................. 70
11.4 GROWTH AND POPULATION .................................................................................................... 70
11.5 MUNICIPAL SERVICES ............................................................................................................ 70
11.6 ORGANIZATION STRUCTURE .................................................................................................. 71
11.7 ACCOUNTABILITY AND TRANSPARENCY ................................................................................. 72
11.8 FINANCIAL OVERVIEW ........................................................................................................... 72
12.0 LAS GALLINAS VALLEY SANITARY DISTRICT ................................................................ 73
12.1 OVERVIEW.............................................................................................................................. 73
12.2 FORMATION AND DEVELOPMENT ........................................................................................... 73
Marin LAFCo iii Central Marin Wastewater Study
Final February 2025
12.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE ................................................................. 76
12.4 GROWTH AND POPULATION .................................................................................................... 77
12.5 MUNICIPAL SERVICES ............................................................................................................ 78
12.6 ORGANIZATION STRUCTURE .................................................................................................. 80
12.7 ACCOUNTABILITY AND TRANSPARENCY ................................................................................. 81
12.8 FINANCIAL OVERVIEW ........................................................................................................... 81
Marin LAFCo iv Central Marin Wastewater Study
Final February 2025
List of Figures
FIGURE 6- 1:CENTRAL MARIN SANITATION AGENCY SERVICE AREA ............................................................................................ 25
FIGURE 6- 2: CMSA DISCHARGE MAP ................................................................................................................................. 29
FIGURE 6- 3: CMSA ORGANIZATION CHART ......................................................................................................................... 30
FIGURE 6- 4: DRAFT CMSA ORGANIZATION CHART ................................................................................................................ 32
FIGURE 8- 1:ROSS VALLEY SANITARY DISTRICT JURISDICTIONAL BOUNDARY AND SPHERE OF INFLUENCE ........................................... 39
FIGURE 9- 1: SAN RAFAEL SANITATION DISTRICT JURISDICTIONAL BOUNDARY AND SPHERE OF INFLUENCE ......................................... 50
FIGURE 9- 2: DRAFT CMSA ORGANIZATION CHART ................................................................................................................ 54
FIGURE 10- 1: SANITARY DISTRICT NO. 2 OF MARIN COUNTY JURISDICTIONAL BOUNDARY AND SPHERE OF INFLUENCE ....................... 61
FIGURE 11- 1: SAN QUENTIN VILLAGE SEWER MAINTENANCE DISTRICT SERVICE AREA .................................................................. 69
FIGURE 12- 1: LAS GALLINAS VALLEY SANITARY DISTRICT JURISDICTIONAL BOUNDARY AND SPHERE OF INFLUENCE ............................. 76
Marin LAFCo v Central Marin Wastewater Study
Final February 2025
List of Tables
TABLE 1-1: LAFCO'S REGULATORY POWERS ................................................................................................................ 7
TABLE 1-2: MANDATORY DETERMINATIONS.................................................................................................................. 8
TABLE 1-3: MARIN LAFCO COMMISSION MEMBERSHIP ................................................................................................ 8
TABLE 2-1: CENTRAL MARIN WASTEWATER MSR AGENCY NAMES ........................................................................... 10
TABLE 2-2: CENTRAL MARIN WASTEWATER MSR AGENCIES' MEETING INFORMATION ............................................. 11
TABLE 6-1: CENTRAL MARIN SANITATION AGENCY OVERVIEW .................................................................................. 22
TABLE 6-2: CENTRAL MARIN SANITATION AGENCY BOARD OF COMMISSIONERS ....................................................... 28
TABLE 6-3: CMSA REVENUES AND EXPENDITURES ..................................................................................................... 32
TABLE 8-1:ROSS VALLEY SANITARY DISTRICT OVERVIEW ......................................................................................... 35
TABLE 8-2: POPULATION CHANGES AS SINGLE CENSUS-DESIGNATED AREAS FOR 2010 AND 2024 ............................. 39
TABLE 8-3: ROSS VALLEY SANITARY DISTRICT BOARD OF DIRECTORS ...................................................................... 42
TABLE 8-4: ROSS VALLEY SANITARY DISTRICT FINANCIAL INFORMATION ................................................................. 44
TABLE 9-1: SAN RAFAEL SANITATION DISTRICT OVERVIEW ....................................................................................... 46
TABLE 9-2: SAN RAFAEL SANITATION DISTRICT BOARD OF DIRECTORS ..................................................................... 51
TABLE 9-3: SAN RAFAEL SANITATION DISTRICT TOTAL REVENUES AND OPERATING EXPENDITURES DATA .............. 54
TABLE 10-1: SANITARY DISTRICT NO. 2 OF MARIN COUNTY OVERVIEW ..................................................................... 56
TABLE 10-2: SANITARY DISTRICT NO. 2 BOARD OF DIRECTORS .................................................................................. 61
TABLE 10-3: SANITARY DISTRICT NO. 2 TOTAL REVENUES AND OPERATING EXPENDITURES DATA ........................... 64
TABLE 11-1: SAN QUENTIN VILLAGE SEWER MAINTENANCE DISTRICT OVERVIEW .................................................... 65
TABLE 11-2: MARIN COUNTY BOARD OF SUPERVISORS ............................................................................................... 68
TABLE 12-1: LAS GALLINAS VALLEY SANITARY DISTRICT OVERVIEW ....................................................................... 70
TABLE 12-2: LAS GALLINAS VALLEY SANITARY DISTRICT BOARD OF DIRECTORS ..................................................... 77
TABLE 12-3: LAS GALLINAS VALLEY SANITARY DISTRICT FINANCIAL INFORMATION ................................................ 79
Marin LAFCo vi Central Marin Wastewater Study
Final February 2025
1.0 INTRODUCTION
1.1 ROLE AND RESPONSIBILITY OF LAFCO
Local Agency Formation Commissions (LAFCos) were established in 1963 and are political
subdivisions of the State of California responsible for providing regional growth management
oversight in all 58 counties. LAFCos’ authority is currently codified under the Cortese-Knox-
Hertzberg Local Government Reorganization Act of 2000 (“CKH”), which specifies regulatory,
and planning powers delegated by the Legislature to coordinate and oversee the establishment,
expansion, and organization of cities and special districts as well as their municipal service areas.
Guiding LAFCos’ regulatory and planning powers is to fulfill specific purposes and objectives
that collectively construct the Legislature’s regional growth management priorities under
Government Code (G.C.) Section 56301. This statute reads:
“Among the purposes of the commission are discouraging urban sprawl,
preserving open space and prime agricultural lands, efficiently providing
governmental services, and encouraging the orderly formation and development
of local agencies based upon local conditions and circumstances. One of the
objects of the commission is to make studies and to obtain and furnish
information which will contribute to the logical and reasonable development of
local agencies in each county and to shape the development of local agencies so
as to advantageously provide for the present and future needs of each county
and its communities.”
LAFCo decisions are legislative in nature and not subject to an outside appeal process. LAFCos
also have broad powers with respect to conditioning regulatory and planning approvals so long
as not establishing terms that directly control land uses, densities, or subdivision requirements.
Regulatory Responsibilities
LAFCos’ principal regulatory responsibility involves approving or disapproving all jurisdictional
changes involving the establishment, expansion, and reorganization of cities and most special
districts.1 More recently LAFCos have been tasked with also overseeing the approval process for
cities and districts to provide new or extended services beyond their jurisdictional boundaries by
existing service. LAFCos generally exercise their regulatory authority in response to applications
submitted by the affected agencies, landowners, or registered voters.
Recent CKH amendments, however, now authorize and encourage LAFCos to initiate on their
own jurisdictional changes to form, consolidate, and dissolve special districts consistent with
current and future community needs. LAFCo regulatory powers are described in Table 1.1
below.
1
CKH defines “special district” to mean any agency of the State formed pursuant to general law or special act for the local
performance of governmental or proprietary functions within limited boundaries. All special districts in California are
subject to LAFCo with the following exceptions: school districts; community college districts; assessment districts;
iMmparroinve LmAenFt dCisotr icts; community facilities districts; transp7or tation districts; anCd aeinr tproalllu Mtioanr cionn tWroal dsitsetwricatst.e r Study
Final February 2025
Table 1-1: LAFCo's Regulatory Powers
Regulatory Powers Granted by Government Code (G.C.) Section 56301
• City Incorporations / Disincorporations • City and District Annexations
• District Formations / Dissolutions • City and District Detachments
• City and District Consolidations • Merge/Establish Subsidiary Districts
• City and District Outside Service Extensions • District Service Activations / Divestitures
Planning Responsibilities
LAFCos inform their regulatory actions through two central planning responsibilities: (a) making
sphere of influence (“sphere”) determinations and (b) preparing municipal service reviews.
Sphere determinations have been a core planning function of LAFCos since 1971 and effectively
serve as the Legislature’s version of “urban growth boundaries” with regard to cumulatively
delineating the appropriate interface between urban and non-urban uses within each county.
Municipal service reviews, in contrast, are a relatively new planning responsibility enacted as
part of CKH and are intended to inform – among other activities – sphere determinations. The
Legislature mandates, notably, all sphere changes as of 2001 be accompanied by preceding
municipal service reviews to help ensure LAFCos are effectively aligning governmental services
with current and anticipated community needs.
1.2 MUNICIPAL SERVICE REVIEWS
Municipal service reviews were a centerpiece to CKH’s enactment in 2001 and are
comprehensive studies of the availability, range, and performance of governmental services
provided within a defined geographic area. LAFCos generally prepare municipal service reviews
to explicitly inform subsequent sphere determinations. LAFCos also prepare municipal service
reviews irrespective of making any specific sphere determinations in order to obtain and furnish
information to contribute to the overall orderly development of local communities. Municipal
service reviews vary in scope and can focus on a particular agency or governmental service.
LAFCos may use the information generated from municipal service reviews to initiate other
actions under their authority, such as forming, consolidating, or dissolving one or more local
agencies.
All municipal service reviews – regardless of their intended purpose – culminate with LAFCos
preparing written statements addressing seven specific service factors listed under G.C. Section
56430. This includes most notably, infrastructure needs or deficiencies, growth and population
trends, and financial standing. The seven mandated service factors are summarized in the
following table.
Marin LAFCo 8 Central Marin Wastewater Study
Final February 2025
Table 1-2: Mandatory Determinations
Mandatory Determinations / Municipal Service Reviews
(Government Code Section 56430)
1. Growth and population projections for the affected area.
2. Location and characteristics of any disadvantaged unincorporated communities within or contiguous
to affected spheres of influence.
3. Present and planned capacity of public facilities, adequacy of public services, and infrastructure
needs or deficiencies.
4. Financial ability of agencies to provide services.
5. Status and opportunities for shared facilities.
6. Accountability for community service needs, including structure and operational efficiencies.
7. Matters relating to effective or efficient service delivery as required by LAFCo policy.
1.3 MARIN LAFCO COMPOSITION
Marin LAFCo is governed by a 7-member board comprised of two county supervisors, two city
council members, two independent special district members, and one representative of the
general public. Each group also gets to appoint one “alternate” member. Each member must
exercise their independent judgment, separate from their appointing group, on behalf of the
interests of all residents, landowners, and the public. Marin LAFCo is independent of local
government and employs its own staff. Marin LAFCo’s current commission membership is
provided below in Table 1-3.
Table 1-3: Marin LAFCo Commission Membership
Name Position Agency Affiliation
Lew Kious Special District Almonte Sanitary District
Barbara Coler, Chair City Town of Fairfax
Eric Lucan County District 5 Supervisor
Dennis Rodoni, Vice Chair County District 4 Supervisor
Steve Burdo City Town of San Anselmo
Craig Murray Special District Las Gallinas Valley Sanitary District
Larry Chu Public Commission
Roger Smith Public Alternate Commission
Cathryn Hilliard Special District Alternate Southern Marin Fire Protection District
Rachel Farac City Alternate City of Novato
Stephanie Moulton-Peters County Alternate District 3 Supervisor
Marin LAFCo offices are located at 1401 Los Gamos Drive, Suite 220 in San Rafael.
Information on Marin LAFCo’s functions and activities, including reorganization applications,
are available by calling (415) 448-5877 by e-mail to staff@marinlafco.org or by visiting
www.marinlafco.org.
Marin LAFCo 9 Central Marin Wastewater Study
Final February 2025
2.0 EXECUTIVE SUMMARY
This study represents Marin LAFCo’s scheduled regional municipal service review of local
agencies that provide wastewater services in the region of central Marin County. The underlying
aim of the study is to produce an independent assessment of the municipal services provided by
the agencies over the next five to ten years relative to the Commission’s regional growth
management duties and responsibilities. The information generated as part of the study will be
directly used by the Commission in (a) guiding subsequent sphere of influence updates, (b)
informing future boundary changes, and – if merited – (c) initiating government reorganizations,
such as special district formations, consolidations, and/or dissolutions.
2.1 AFFECTED PUBLIC AGENCIES
This report focuses on two independent special districts, four dependent special districts, and one
joint powers authority (JPA) operating in the central corridor of Marin County as listed below
and shown in Figure 2.1.
Table 2-1: Central Marin Wastewater MSR Agencies
Central Marin Wastewater MSR Agency Names
Ross Valley Sanitary District (RVSD)
Sanitary District No. 2 of Marin County (SD2)
Central Marin Sanitation Agency (CMSA)
San Rafael Sanitation District (SRSD)
San Quentin Village Sewer Maintenance District
(SQVSMD)
Las Gallinas Valley Sanitary District (LGVSD)
Murray Park Sewer Maintenance District (MPSMD)
2.2 PLANS, POLICIES, STUDIES
Key references and information sources for this study were gathered for each agency considered.
The references utilized in this study include published reports; review of agency files and
databases (agendas, minutes, budgets, contracts, audits, etc.); Master Plans; Capital Improvement
Plans; engineering reports; EIRs; finance studies; general plans; and state and regional agency
information (permits, reviews, communications, regulatory requirements, etc.). Additionally, the
LAFCo Executive Officer and Deputy Executive Officer contacted each agency with requests for
information.
The study area for this MSR includes eight cities/towns, multiple census-designated
unincorporated communities, as well as a number of unincorporated neighborhoods adjacent to
the cities. In the areas entirely outside of the cities, Marin County has the primary authority over
local land use and development policies (and growth). The eight respective municipalities have
authority over land use and development policies within their distinct jurisdictions. City,
Marin LAFCo 10 Central Marin Wastewater Study
Final February 2025
County, and Community plans were vital for the collection of baseline and background data for
each agency. The following is a list of documents used in the preparation of this MSR:
• County General Plans
• Housing Elements
• Specific Plans
• Community Plans
• Sewer System Master Plans
• Wastewater Treatment Plant Master Plan
• Previous municipal service reviews
• Agency databases and online archives (agendas, meeting minutes, website information)
2.3 AGENCY AND PUBLIC PARTICIPATION
Within the approved scope of work, this study has been prepared with an emphasis on soliciting
outside public review and comment as well as multiple opportunities for input from the affected
agencies. This included an agency startup meeting with Marin LAFCo, information requests sent
to individual agencies, draft agency profiles also sent to agencies, and a review of the draft report
prior to Commission action.
This MSR is posted on the Commission’s website (www.marinlafco.org). It may also be
reviewed at the LAFCo office located at 1401 Los Gamos Drive, Suite 220 in San Rafael during
open hours.
Table 2-2: Central Marin Wastewater MSR Agencies’ Meeting Information
Central Marin Wastewater Municipal Service Review – Agency Transparency
Agency Governing Meeting Meeting Location Televised/ Website
Body Date/Time Streaming
Ross Valley Board of 3rd Wednesday RVSD Admin Building No https://www.rvsd.org/1
Sanitary Directors at 5:00 p.m. 1111 Anderson Drive 98/Board-of-Directors
District San Rafael, CA
Central Board of 2nd Tuesday at CMSA Board Room No https://www.cmsa.us/b
Marin Commissioners 6:00 p.m. 1301 Andersen Drive oard/agendas-and-
Sanitation San Rafael, CA minutes
Agency
San Rafael Board of 3rd Friday at San Rafael City Hall Yes https://www.cityofsanr
Sanitation Directors 9:00 a.m. 1400 5th Avenue afael.org/sanitation-
District San Rafael, CA district-board-of-
directors/
Las Gallinas Board of 1st and 3rd LGVSD Office No https://www.lgvsd.org/
Valley Directors Thursday at 101 Lucas Valley Road board-meetings
Sanitary 4:00 p.m. San Rafael, CA
District
San Quentin Board of Scheduled Marin County Civic Center Yes marincounty.gov/depar
Village Sewer Directors Tuesdays 9:00 3501 Civic Center Drive tments/board
Maintenance
a.m. San Rafael, CA
District
Marin LAFCo 11 Central Marin Wastewater Study
Final February 2025
Sanitary Board of 1st and 3rd Corte Madera Town Hall No https://www.cortema
District No. 2 Directors Tuesday at 300 Tamalpais Drive dera.gov/600/Counci
of Marin 6:45 p.m. Corte Madera, CA lmembers
County
Murray Park Board of 3rd Wednesday RVSD Admin Building No https://www.rvsd.org/1
Sewer Directors at 5:00 p.m. 1111 Anderson Drive 98/Board-of-Directors
Maintenance San Rafael, CA
District
2.4 WRITTEN DETERMINATIONS
The Commission is directed to prepare written determinations to address the multiple governance
factors enumerated under G.C. Section 56430 anytime it prepares a municipal service review.
These determinations are similar to findings and serve as independent statements based on
information collected, analyzed, and presented in this study’s subsequent sections. The
underlying intent of the determinations is to identify all pertinent issues relating to the planning,
delivery, and funding of municipal services as they relate to the Commission’s role and
responsibilities. An explanation of these seven determination categories is provided below.
1. Growth and Population
This determination evaluates existing and projected population estimates for each of the
unincorporated communities within the study area.
2. Location and Characteristics of any Disadvantaged Unincorporated Communities
Within or Contiguous to the Sphere of Influence.
This determination was added by Senate Bill (SB) 244, which became effective in
January 2012. A disadvantaged community is defined as an inhabited community of 12 or
more registered voters having a median household income of 80 percent or less than the
statewide median household income.
3. Capacity and Infrastructure
Also discussed is the adequacy and quality of the services provided by each agency,
including whether sufficient infrastructure and capital are in place (or planned for) to
accommodate planned future growth and expansions.
4. Financing
This determination provides an analysis of the financial structure and health of each
service provider, including the consideration of rates and service operations, as well as
other factors affecting the financial health and stability of each provider. Other factors
considered include those that affect the financing of needed infrastructure improvements
and compliance with existing requirements relative to financial reporting and
management.
5. Shared Facilities
Opportunities for districts to share facilities are described throughout this MSR. Practices
and opportunities that may help to reduce or eliminate unnecessary costs are examined,
Marin LAFCo 12 Central Marin Wastewater Study
Final February 2025
along with cost avoidance measures that are already being utilized. Occurrences of
facilities sharing are listed and assessed for more efficient delivery of services.
6. Government Structure and Local Accountability
This subsection addresses the adequacy and appropriateness of existing boundaries and
spheres of influence and evaluates the ability of each service provider to meet its
demands under its existing government structure. Also included is an evaluation of
compliance by each provider with public meeting and records laws (Brown Act).
7. Other Matters Related to Effective or Efficient Service Delivery, as Required by
Commission Policy
Marin LAFCo has specified the sustainability of local agencies as a priority matter for
consideration in this MSR. Sustainability is not simply about the environment but can
consider the sustainability of an organization and its ability to continue to provide
services efficiently for many years to come. Sustainable local governments that take
practical steps to protect the environment and our natural resources through land
conservations, water recycling and reuse, preservation of open space, and opting to use
renewable energy are the key players in determining the sustainability of the region.
In addition, other matters for consideration could relate to the potential future SOI
determination and/or additional effort to review potential advantages or disadvantages of
consolidation or reorganization.
A summary of determinations regarding each of the above categories is provided in Chapter 3
of this document and will be considered by Marin LAFCo in assessing potential future changes
to an SOI or other reorganization.
Marin LAFCo 13 Central Marin Wastewater Study
Final February 2025
3.0 DETERMINATIONS
Growth and population projections for the affected area.
a) Despite an annual population decline since 2017 of -0.48%, the Association of Bay Area
Governments (ABAG) projects the population of Marin County to grow by 12% by 2040 to a
total population of 283,000. While the current development potential within the multiple
planning areas throughout the County is fairly minimal, ABAG’s Regional Housing Needs
Allocation plan has required the addition of 3,569 housing units in unincorporated Marin
County, and 9,971 units within all of the incorporated cities and towns throughout the
County. Using the baseline of the average persons per household captured by the 2020
Census for Marin County of 2.4, if the full RHNA allocation were to be met, it could
reasonably be assumed to add approximately 32,000 people to the current population
estimate of 252,959.
Within the affected agencies in the study area, the total estimated population is 129,282.
Each of the agencies among LGVSD, RVSD, SD2, SQVSMD, and SRSD have seen minimal
growth since 2010, with SD2 having the highest annual growth rate during this stretch of
0.66%. As each of the areas within the affected agencies is essentially built out, additional
growth over the next ten years is expected to be minimal and on par with what has been
experienced over the past decade. Despite the Regional Housing Needs Allocation (RHNA)
housing mandates within each of the affected agencies’ jurisdictions, the anticipated growth
impacts from these prospective developments are anticipated to be dispersed well beyond the
current planning cycle due in part to the nature of development difficulties in Marin County,
the current costs of development in correlation to the requirement of affordable housing, and
the cost of living in the area.
The location and characteristics of any disadvantaged unincorporated communities within
or contiguous to the sphere of influence.
a) One census tract block group (Tract 1121, Block Group 1) that has been designated by
Marin LAFCo as a disadvantaged unincorporated community (DUC) based on 2023
American Community Survey data has been identified within the study area. The block
group is situated within the northern section of the California Park unincorporated island in
the southern San Rafael area. A disadvantaged community is defined in Water Code Section
7905.5(a) as a community with an annual median household income of less than 80 percent
of the statewide median household income. The statutory definition of DUCs comes from
Government Code Section 56033.5, which defines DUCs as “inhabited territory” that
constitutes all or a portion of a disadvantaged community. “Inhabited territory” may be
defined by Government Code Section 56046 as having at least 12 registered voters, or it can
be determined by “commission policy”.
Marin LAFCo 14 Central Marin Wastewater Study
Final February 2025
Per Marin LAFCo’s policy, Marin LAFCo will include considerations of disadvantaged
unincorporated communities within a city or district sphere of influence in statements of
written determinations of municipal service reviews. Marin LAFCo will prohibit the
approval of city annexations greater than 10 acres that are contiguous to a disadvantaged
unincorporated community unless the city applies to annex the disadvantaged unincorporated
community as well. At this time Marin LAFCo has no applications for annexation for any
lands contiguous to the identified DUC. Should LAFCo in the future get such a request then
it will work with the community to determine if it is in the best interest of those living within
the DUC to be annexed. If it is not in the community's best interest, then they would not be
included in that application.
Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies including needs or deficiencies related to sewers,
municipal and industrial water, and structural fire protection in any disadvantaged
unincorporated communities within or contiguous to the sphere of influence.
a) All of the affected agencies with collection systems and/or treatment facilities in Central
Marin are accounting for and funding therein replacement of their capital infrastructure,
albeit to different degrees and accordingly producing a sizeable range in equipment age
among the agencies. Each of the agencies over the course of the study window has
accelerated its approach to infrastructure rehabilitation in comparison to the previous study
window. All of the wastewater collection systems within Central Marin appear adequately
sized in accommodating current and projected flow demands. This comment is substantiated
given none of the affected agencies’ collection systems' peak-day demands generated during
the study period exceeded 74% of estimated capacity.
LGVSD is the entity responsible for treating and disposing of all wastewater generated
within the Las Gallinas Watershed portion of Central Marin and has adequate capacity to
accommodate current and projected flows through the next 5 years. CMSA is the entity
responsible for treating and disposing of all wastewater generated within the Ross Valley and
San Rafael Creek Watersheds portion of Central Marin and has adequate capacity to
accommodate current and projected flows through the next 5 years.
Financial ability of agencies to provide services.
a) The Central Marin Sanitation Agency, Ross Valley Sanitary District, San Rafael Sanitation
District, Las Gallinas Valley Sanitary District, Sanitary District No. 2 of Marin County, and
San Quentin Village Sewer Maintenance District all prepare annual budgets and financial
statements in accordance with established governmental accounting standards. The Boards
of Directors, Boards of Commissioners, and the County Board of Supervisors acting as the
Marin LAFCo 15 Central Marin Wastewater Study
Final February 2025
Board for SQVSMD, may amend their budgets by resolution during the fiscal year in order to
respond to emerging needs, changes in resources, or shifting priorities. Expenditures may
not exceed appropriations at the fund level, which is the legal level of control.
b) The special district General Managers and County Administrative Officer are authorized
to transfer budgeted amounts between accounts, departments, or funds under certain
circumstances, however; the Special District Boards, JPA Commission, and County Board of
Supervisors acting as the Board for the SQVSMD, must approve any increase in the
operating expenditures, appropriations for capital projects, and transfers between major funds
and reportable fund groups. Audited financial statements are also prepared for each agency
by independent certified public accounting firms.
c) While additional revenues are needed to provide some services and maintain
infrastructure covered in this MSR, each agency meets its current and projected financial
responsibilities to provide services. While SQVSMD creates sufficient annual revenue to
meet current expense trends, a rate increase would be necessitated in the case that the
District’s residents were charged for CMSA treatment services that are currently being
received. Each of the affected agencies within the study area has demonstrated strong
financial health over the study window. All of the agencies, with the exception of SQVSMD
due to its minimal infrastructure and focus on the proactive maintenance of that infrastructure
as opposed to large-scale replacement, have been proactive in ensuring rates are adjusted to
ensure that both current and future capital improvement plans are attainable while continuing
to provide the same level of uninterrupted service to its user base. Each of the agencies has
shown consistent growth in net position, significant investment in capital assets, and
budgetary management that has shown revenues outpacing operating expenditures on an
annual basis.
Status of, and opportunities for, shared facilities.
a) No opportunities were identified for the sharing specifically of constructed facilities
between any of the agencies reviewed within the study.
Accountability for community service needs, including governmental structure and
operational efficiencies.
a) Given the contiguous nature of the three single-service wastewater collection agencies
within CMSA as well as the significant possibility of the pending consolidation of services
between SRSD and CMSA, the Commission as well as the affected agencies should continue
to evaluate options to potentially reorganize and consolidate public wastewater services in
Central Marin among agencies in the Ross Valley and San Rafael Creek Watersheds. Should
the consolidation efforts between SRSD and CMSA be completed, an annual evaluation of
not just cost savings but also employee retention and service delivery efficiency should be
completed in order to further examine whether further consolidation efforts throughout the
region could produce greater accountability and efficiency within the combined watershed.
Marin LAFCo 16 Central Marin Wastewater Study
Final February 2025
b) The reorganization of SQVSMD by dissolving the District and concurrently placing its
respective service area into RVSD by annexation appears readily merited to improve local
accountability and service efficiencies. This reorganization would eliminate a seemingly
superfluous dependent special district governed by the County of Marin in favor of
recognizing RVSD as the preferred and more capable service provider moving forward.
c) Corrective action is needed to appropriately amend jurisdictional boundaries to better
align service areas with existing property lines within the Ross Valley and San Rafael Creek
Watersheds. Similarly, boundary clean-ups are needed to correct instances where actual
service provision in this region does not match up with assigned jurisdictional boundaries.
Any other matter related to effective or efficient service delivery, as required by
commission policy
a) During the course of this municipal service review, Marin LAFCo requested information
from the Las Gallinas Valley Sanitary District regarding the area that is currently outside of
its jurisdictional boundary just to the southwest of its treatment plant. The area in question
holds the McInnis Park Golf Center, the San Rafael Airport, and two recently completed
developments of Gravity Vault Marin and Flyte Racquet Club. Given that this area is
essentially surrounded by LGVSD lands and is in such close proximity, Marin LAFCo
inquired as to whether the District was providing wastewater collection/treatment to these
high-use facilities. District staff was unable to provide Marin LAFCo with the requested
information within the allotted time available. As such, LGVSD staff should complete the
necessary testing to assess whether service is currently being provided to this area and report
back to Marin LAFCo with the findings. If service is currently being provided, the District
should submit an application for annexation to Marin LAFCo in a timely manner.
b) During the course of this study, staff discovered that SQVSMD ratepayers do not receive
charges for the treatment of their wastewater from CMSA. It appears that this has been
occurring due to the SQVSMD system feeding into the San Quentin Rehabilitation Center,
which then mixes with that facility’s wastewater flows, and the facility being charged a fixed
annual fee under the current contractual agreement. In addition, the Caltrans Maintenance
yard which is just outside of SQVSMD boundaries has been sending wastewater flows
through SQVSMD to CMSA without payment to SQVSMD for collection or to CMSA for
treatment.
Marin LAFCo 17 Central Marin Wastewater Study
Final February 2025
4.0 RECOMMENDATIONS
The following recommendations call for specific action either from the Commission and/or
by the affected agencies based on information generated as part of this study.
Recommendations for Commission action are dependent on a subsequent directive from the
membership and through the adopted work plan.
1. Representatives from the County of Marin, acting on behalf of the San Quentin
Village Sewer Maintenance District, and staff from the Ross Valley Sanitary District
should continue to explore the feasibility of the reorganization of the area of
SQVSMD into RVSD. Should an agreement be reached, any application for
annexation of SQVSMD should also include the annexation of assessor parcel
number 018-154-11. This parcel lies adjacent to SQVSMD on the eastern side of
Main Street and is approximately 11.43 acres. It contains a California Department of
Transportation (Caltrans) maintenance station. The wastewater from this parcel flows
into the SQVSMD system on it way to the Central Marin Sanitation Agency
treatment plant and should be subject to the respective collection and treatment fees
associated. Should an agreement between SQVSMD and RVSD not be forthcoming
in the near future then SQVSMD and Caltrans should work to submit an application
for the Caltrans parcel to be annexed into SQVSMD so it can pay for its use of the
systems.
2. The Ross Valley Sanitary District should submit an application to Marin LAFCo for
the annexation of the area of the San Quentin Peninsula that is currently outside of its
jurisdictional boundary but within the area of its current sphere of influence for the
Commission’s consideration. Should the annexation be approved, the District would
still bear the responsibility of negotiating any agreement for future service with the
San Quentin State Rehabilitation Center as well as the reorganization of the San
Quentin Village Sewer Maintenance District.
3. Given the contiguous nature of the three single-service wastewater collection
agencies within CMSA as well as the ongoing discussions surrounding the possible
consolidation of services between SRSD and CMSA, the Commission as well as the
affected agencies should continue to evaluate options to potentially reorganize and
consolidate public wastewater services in Central Marin among agencies in the Ross
Valley and San Rafael Creek Watersheds. Should the consolidation efforts between
SRSD and CMSA be completed, an annual evaluation of not just cost savings but also
employee retention and service delivery efficiency should be completed in order to
provide a clearer analysis of whether further consolidation efforts throughout the
region could produce greater accountability and efficiency within the combined
watershed.
Marin LAFCo 18 Central Marin Wastewater Study
Final February 2025
4. Though not a legislatively mandated requirement of public agency websites, the San
Rafael Sanitation District should add information to its website regarding its current
rates, rate schedule, the most recent Prop 218 process it completed, and any rate study
that was completed as this has become standard operating procedure and a generally
accepted best practice amongst public wastewater agencies.
5. During the course of this municipal service review, Marin LAFCo requested
information from the Las Gallinas Valley Sanitary District regarding the area that is
currently outside of its jurisdictional boundary just to the southwest of its treatment
plant. The area in question holds the McInnis Park Golf Center, the San Rafael
Airport, and two recently completed developments of Gravity Vault Marin and Flyte
Racquet Club. Given that this area is essentially surrounded by LGVSD lands and is
in such close proximity, Marin LAFCo inquired as to whether the District was
providing wastewater collection/treatment to these high-use facilities. District staff
was unable to provide Marin LAFCo with the requested information within the
allotted time available. As such, LGVSD staff should complete the necessary testing
to assess whether service is currently being provided to this area and report back to
Marin LAFCo with the findings. If service is currently being provided, the District
should submit an application for annexation to Marin LAFCo in a timely manner.
6. In the same manner that staff from RVSD and SD2 worked collaboratively and
proactively to test and confirm which district was providing service to each of the
properties along their shared boundary area, SRSD, LGVSD, and RVSD should make
an effort to perform a similar analysis in order to ensure boundary lines are correct
and that customers are receiving billing from the correct agency. In addition, any
district that has island(s) of areas within their broader boundary that do not show as
being serviced and in one of these smaller islands should determine if they are getting
service and then work with LAFCo to fix the situation.
7. Through the course of this study, LAFCo staff determined that a sphere of influence
was never formally established for SQVSMD. It appears, though not substantiated in
any identified document, this is the result of previous notions that SQVSMD falls
outside of the Commission’s authority due to its size and the principal act under
which it was formed. Commission staff has revisited this matter as part of this study
and, after conferring with both other LAFCos around the state as well as State
Government Code, conclude that SQVSMD and more specifically sewer maintenance
districts formed under Public Health and Safety Code Section 4860-4927 are subject
to LAFCo and as such a sphere designation is ultimately required. Marin LAFCo
staff recommends the Commission adopt a zero sphere of influence in order to
indicate the Commission’s stance that the District should be reorganized in the future.
8. Land use authorities in Central Marin should work proactively to match the affected
wastewater service provider with sites that have been identified for potential
Marin LAFCo 19 Central Marin Wastewater Study
Final February 2025
development opportunities in their recently updated housing elements as a means to
better sync land use and service planning in the region.
9. SQVSMD, CMSA, the San Quentin Rehabilitation Center, and Caltrans should all
work together to ensure each is paying its proper share for both the collections and
treatment of wastewater in that area. RVSD may also need to be included in
discussions if it is determined that in the near future, a consolidation of the SQVSMD
into RVSD could occur.
10. Given the apparent and continually evolving impacts of climate change on local
precipitation totals, CMSA should continue to explore the feasibility of the
production of both recycled water and direct potable reuse in order to aid in the
sustainability of Central Marin’s future water supplies
Marin LAFCo 20 Central Marin Wastewater Study
Final February 2025
5.0 REGIONAL SETTING
The Central Marin Wastewater Municipal Service Review (MSR) study area consists of the
Central Marin County Highway 101 Corridor encompassing an area that is approximately 60
square miles. Seven public agencies, including one joint powers authority (JPA), are reviewed
within this document. Many distinct communities lie within and adjacent to the Study Area.
These communities are served by a number of municipal service providers that have been
established over time to meet local conditions and needs. While jurisdictional boundaries define
the geographical extent of an agency’s authority and responsibility to provide services, there are
several instances of overlapping service responsibilities in the Study Area both by contractual
and informal agreements. These service arrangements and relationships for providing municipal
services within the Study Area are described in this report.
Within the study area, all incorporated and unincorporated communities are within the current
boundary or service area of a fire protection and emergency medical service provider. While
there are several small pockets of development in the study area that are not currently provided
sanitary sewer service by a local agency, the vast majority are within the jurisdictional boundary
Marin LAFCo 21 Central Marin Wastewater Study
Final February 2025
of one of the sanitary sewer agencies. The Marin Municipal Water District provides water for
domestic use and fire-flow to the entire study area.
Marin LAFCo 22 Central Marin Wastewater Study
Final February 2025
6.0 CENTRAL MARIN SANITATION AGENCY
6.1 OVERVIEW
The Central Marin Sanitation Agency (CMSA) was established in 1979 as a joint powers
authority (JPA) under Section 6500 of the California State Government Code. The JPA provides
wastewater treatment and disposal to the three member agencies that comprise the authority:
Ross Valley Sanitary District, San Rafael Sanitation District, and Sanitary District #2. CMSA is
also contracted by the State of California to treat and dispose of wastewater received from the
San Quentin Rehabilitation Center, and also by the County of Marin for the operation and
maintenance of the San Quentin Village Sewer Maintenance District. The JPA’s service area
encompasses approximately 36.5 square miles. The last municipal service review that included
CMSA was conducted in 2017.
Table 6-1: Central Marin Sanitation Agency Overview
Central Marin Sanitation Agency
Primary Contact: Jason Dow Phone: (415)-459-1455
Mailing Address: 1301 Anderson Drive, San Rafael
Formation Date: October 15, 1979
Services Provided: Wastewater Treatment/Disposal
Service Area: 23,350 acres Population Served: ≈105,000
6.2 FORMATION AND DEVELOPMENT
The Central Marin Sanitation Agency was formed in October of 1979 for the purpose of carrying
out the construction and installation of advanced wastewater treatment and disposal facilities to
serve the Central Marin area. The initial agreement included four member agencies: the City of
Larkspur, San Rafael Sanitation District, Sanitary District #1 of Marin County2, and Sanitary
District #2 of Marin County. The agreement provided for the planning, acquisition, financing,
construction, maintenance, and operation of a regional wastewater treatment facility, and
maintenance of certain facilities already in place, as well as responsibility for all functions
pertaining to the treatment, reclamation, and disposal of sewage and other wastewater.
The service areas that would eventually make up CMSA’s contracted service area were primarily
agricultural hubs in the early 1900s, with a population totaling just over 6,000 residents in 1900.
Over the course of the following 40 years however, significant increases in accessibility to the
region such as multiple rail lines, ferry services, and the completion of the Golden Gate Bridge in
1937 would all contribute to this population total ballooning to just under 21,000 in 1940. As the
growth continued into the 1950s, multiple agencies were necessitated for wastewater collection
to accommodate the current and anticipated growth. The four that provided wastewater
collection service within what would become CMSA’s service area were Sanitary District #1 of
2 Sanitary District #1 of Marin County adopted a resolution changing the District’s name to the Ross Valley Sanitary
District (RVSD) in February of 2018 and will be referred to as such throughout this document.
Marin LAFCo 23 Central Marin Wastewater Study
Final February 2025
Marin County (SD1), Sanitary District #2 of Marin County (SD2), San Rafael Sanitation District,
and the City of Larkspur. SD1 also had a treatment facility and contracted with SD2 and the
City of Larkspur to provide treatment and disposal of the three agencies’ wastewater. San Rafael
Sanitation District owned and operated its own two treatment plants.
Between 1940 and 1970, the population within the CMSA service area grew by nearly four times
to just over 81,000 residents. This rapid population growth, not just in this service area but
throughout the greater Bay Area at the time, began to raise significant concerns about the manner
in which agencies were handling wastewater discharges. New federal and state water pollution
laws, such as the Clean Water Act of 1972 with its National Pollutant Discharge Elimination
System (NPDES) permit requirements added much-needed regulations to help improve the
quality of wastewater discharges into surface waters. The new legislation simultaneously
provided a grant funding mechanism for local agencies to receive monies to construct the new
treatment facilities that would be necessary to meet the new regulations that required all
wastewater discharges to meet enhanced quality standards.
Soon after the official formation of CMSA on October 15, 1979, the newly formed Joint Powers
Agency (JPA) applied for grant funding for the construction of numerous wastewater system
improvements in central Marin County, such as pump stations, interceptors, a new regional
treatment plant, and wastewater outfall. Of what would eventually amount to a total construction
cost of $84 million for the new facilities, approximately 87.5% of the total cost was funded by
federal and state clean water grants. The new treatment plant, located on San Quentin Point,
began operation in January of 1985 with a permitted average dry weather flow capacity of 10
million gallons per day3 and a sustained peak secondary treatment design capacity of 30 million
gallons per day.
In 1993, Marin LAFCo approved the annexation of the territory of the City of Larkspur by SD1
and the transfer of responsibility for sewer service provided by Larkspur to the Sanitary District.
LAFCo, however, did not attach terms and conditions of approval requiring the alteration of
representation on the CMSA governing board. As a result, the City of Larkspur continued to
appoint a representative to the CMSA board despite having no role in services provided by
CMSA.
In May 2012, the County of Marin entered into an agreement with CMSA for the operation and
maintenance of the San Quentin Village Sewer Maintenance District’s (SQVSMD) sewer system
assets. The County owns and had previously been operating the SQVSMD sewer collection
system.
At its December 12, 2018, meeting, the Larkspur City Council approved a resolution to withdraw
the City from CMSA due to its wastewater operations having been annexed by the Ross Valley
Sanitary District (formerly SD1). The withdrawal agreement and revised JPA both reflected the
City of Larkspur’s removal from representation on the CMSA board. The updated JPA
agreement was approved by the CMSA member agencies in January 2020.
3 CMSA Facilities Master Plan Pg. 1-1
Marin LAFCo 24 Central Marin Wastewater Study
Final February 2025
Figure 6- 1: Central Marin Sanitation Agency Service Area
6.3 SERVICE AREA
There is no formal jurisdictional boundary set by the Commission for CMSA, as would be the
case for other agencies under LAFCo oversight such as cities, towns, and special districts, due to
the agency’s formation as a joint powers authority. CMSA’s service area is statutorily bound to
match its three member agencies’ jurisdictional boundaries. This area covers 23,350 acres (36.5
square miles), within which there are nine distinct land use authorities. The County of Marin
accounts for approximately 40% of the CMSA service area and includes the census-designated
places of Kentfield, Greenbrae, and Sleepy Hollow, as well as the unincorporated areas
surrounding the City of San Rafael, the Town of Tiburon, and the Town of Fairfax, and also
CMSA’s largest single customer, the San Quentin State Rehabilitation Center. Approximately
19% of the CMSA service area is within the city limits of San Rafael (approximately two-thirds
of the City of San Rafael in total), 15% within the Town of San Anselmo, 12% in the Town of
Fairfax, 3% in the Town of Corte Madera, 4% in the Town of Ross, 6% in the City of Larkspur,
2% in the Town of Tiburon, and the City of Mill Valley makes up slightly less than 1%. As joint
Marin LAFCo 25 Central Marin Wastewater Study
Final February 2025
powers authorities are not assigned spheres of influence within the California State Government
Code, CMSA in and of itself has no assigned sphere of influence.
6.4 GROWTH AND POPULATION
The service area of the Central Marin Sanitation Agency is coterminous with the jurisdictional
boundaries of its three member agencies. The growth and population data for those three
districts within this study (San Rafael Sanitation District, Ross Valley Sanitary District, and
Sanitary District No. 2) can be found in those district’s respective agency profiles within this
study. CMSA also contracts with the County of Marin to provide service to the San Quentin
Village Sewer Maintenance District. The growth and population data for that district can be
found in that agency’s profile within this study. Lastly, CMSA contracts with the State of
California Department of Corrections to provide service to the San Quentin Rehabilitation
Center. As of June 2024 (the most recent data publicly available) the total population of the San
Quentin Rehabilitation Center4 was 3,361.
6.5 MUNICIPAL SERVICES
Wastewater Collection and Treatment
CMSA provides wastewater treatment and disposal to each of the three collection agencies that
create the JPA’s service area, as well as the San Quentin Rehabilitation Center and the San
Quentin Village. The wastewater treatment plant treats raw wastewater from its members
through a process consisting of screening and grit removal, followed by primary and secondary
treatment processing, after which the processed wastewater is disinfected and dechlorinated
before ultimately being discharged into the San Francisco Bay. Figure 6-2 shows a satellite view
of the location of the wastewater treatment plant as well as the effluent outflow and discharge
areas. CMSA operates under the permit provisions of the California Regional Water Quality
Control Board – San Francisco Bay Region (RWQCB) with respect to discharge allowances.
This permit5 was most recently renewed on May 10, 2023, and extends through June 30, 2028.
Biosolids removed from the wastewater stream are treated by sludge thickening, anaerobic
digestion, biosolids dewatering, and the biogas generated in the digesters is used as fuel in a
cogeneration system that produces renewable power. Biosolids are reused at the Redwood
Landfill, land application sites in Sacramento County and the Organic Materials Recovery
Center in Fairfield.
In 2010, CMSA completed a $58 million upgrade to the facility known as the Wet Weather
Improvements Project to expand treatment and storage facilities to accommodate intense wet
weather events and better protect against inflow and infiltration during wet weather flows from
its collection agencies. Among other significant improvements, the project included two new
primary clarifiers to increase the primary treatment capacity to 125 million gallons per day
(previously 90 million gallons per day) and a new 155 million gallons per day effluent pumping
station. While the agency is no longer reliant upon it, CMSA maintains a storage pond for
4 California Department of Corrections Office of Research Statistical Reports (SB601)
5 Reference to RWQCB National Pollutant Discharge Elimination System Permit No. CA0038628
Marin LAFCo 26 Central Marin Wastewater Study
Final February 2025
effluent flow shaving with the ability to hold 7.2 million gallons in the case of emergencies or to
allow for facility shutdowns to accommodate maintenance and construction activities.
In 2023, CMSA provided treatment and disposal within its service area in the total amount of
51,268 equivalent dwelling units (EDU). CMSA’s definition of an EDU is “A unit of
wastewater discharge that is the estimated volume and strength generated by a single-family
residence.” In that same year, the wastewater treatment plant had an average dry weather flow of
8.3 million gallons per day and a total average daily wastewater treatment of 13.3 million gallons
per day. The total annual flow for the facility for the year was approximately 4.8 billion gallons.
These totals were all in line with the averages throughout the course of the study window.
CMSA reported zero sanitary sewer overflows (SSO) from its treatment facility during the
course of the study window. In the event of an SSO occurrence, CMSA has established
protocols such as contacting the RWQCB within two hours of a spill being identified as well as
notifying Marin County Environmental Health Services and the Office of Emergency Services.
Final effluent exceedances of compounds specified in CMSA’s NPDES permit must be followed
by a notification to RWQCB within 24 hours of discovery. Samples must also be collected to
quantify any environmental safety impacts. CMSA has not experienced an exceedance of its
NPDES permit during the course of the study window.
CMSA bills its JPA member agencies an annual regional sewer service charge that is from a
CMSA Board adopted 5-year Revenue Plan, and a semi-annual debt service charge pursuant to
revenue bond payment agreements. CMSA bills San Quentin Rehabilitation Center a monthly
service fee for wastewater treatment, debt service, and operation and maintenance of the
facility’s main pump station. CMSA allocates sewer service charges to each of its member
agencies based on a three-year rolling average of the volume and strength of delivered
wastewater. This methodology allows for the calculation of a cost per equivalent dwelling unit.
Beginning in fiscal year 2018, the annual debt service charges have been billed to member
agencies based upon fixed EDU counts (totaling 52,044 EDUs) assigned to each member in an
effort to avoid fluctuations in debt service allocation. In FY 2023, the regional sewer service
charge was $278.59 per EDU and the debt service charge was $108.61 per EDU. Ross Valley
Sanitary District produced the most EDUs at 22,114, followed by San Rafael Sanitation District
at 19,334, and Sanitary District No 2 at 5,815. San Quentin Rehabilitation Center has a fixed
EDU total of 4,005 annually. Over the course of the 5-year study window, the regional service
charge has increased 17.6%6.
The CMSA treatment facility is equipped with two 261,381 cubic foot capacity anaerobic
digesters that are fed wastewater sludge from the primary and secondary clarifiers,
fats/oils/grease (FOG)7, liquid organic wastes, and food wastes from private haulers. The
6 CMSA FY 2023 ACFR; Pg. 120
7 In 2006, the SWRCB issued a statewide general waste discharge requirement for all collection system agencies
within the State that requires each to prepare a Sewer System Master Plan and a source control program for FOG,
if FOG is determined by the collection system agency to be a contributor to sewer overflows. CMSA has
agreements with each of its member agencies as well as the Tamalpais Community Services District and the
Almonte Sanitary District to administer a FOG source control program.
Marin LAFCo 27 Central Marin Wastewater Study
Final February 2025
agency’s organic waste program, known as the Central Marin Food-to-Energy (F2E) program,
was instituted in 2014 in partnership with Marin Sanitary Service. Marin Sanitary Service
collects pre-consumer food waste from restaurants, markets, and other small businesses in its
service area and after being processed at the Marin Sanitary Service Facility, a truck transports
the processed food waste to CMSA’s organic waste facility. Organic wastes are mixed with the
wastewater sludges in the digesters and produce enough biogas to power the CMSA facility an
average of 19.6 hours per day over the past year, and for several days each week, CMSA is
energy independent and exports excess to Marin Clean Energy. The organic waste receiving
program and cogeneration system have been so successful that in FY 2021, CMSA received
permission from Pacific Gas and Electric (PG&E) to export excess power to its electrical grid,
and CMSA has exported and sold renewable power to Marin Clean Energy through a Power
Purchase Agreement. CMSA brought a new 995kW cogeneration system online in 2023 that
allowed for even greater renewable energy production capacity.
CMSA maintains multiple contractual agreements for service with local agencies that offer such
services as operating, maintaining, and monitoring wastewater pump stations and force mains,
operating and maintaining sewer collection systems, and regulating commercial and industrial
businesses that discharge to the sewer system. The first of these such agreements is with
Sanitary District No. 2. CMSA and SD2 entered into this agreement in 1985 for CMSA to
operate and maintain SD2’s 19 pump stations and provide maintenance to the District’s force
mains. In 2012, CMSA entered into an agreement with the California Department of Corrections
to operate and maintain the San Quentin Rehabilitation Center’s main pump station and force
main that transports wastewater to CMSA’s treatment plant, as well as the treatment and disposal
of the facility’s wastewater. Additionally, in 2012 CMSA and the County of Marin entered into
an agreement for the operation and maintenance of the County’s sewer collection system and
pump station in the San Quentin Village Sewer Maintenance District.
Marin LAFCo 28 Central Marin Wastewater Study
Final February 2025
Figure 6- 2: CMSA Discharge Map
6.6 ORGANIZATION STRUCTURE
Board of Commissioners
The Central Marin Sanitation Agency receives oversight and policy direction by way of a five-
member Board of Commissioners. Their governance authority is established under the Joint
Exercise of Powers Act which authorizes two types of joint powers authority arrangements. The
first type consists of two or more public agencies that jointly contract to exercise common
service powers, and the second type consists of two or more public agencies that jointly contract
to form a separate legal entity to provide common service powers. CMSA was formed under the
latter structure as a legally autonomous agency. Each of the three member agencies appoints at
least one member of its governing body as a delegate to serve on the CMSA Board of
Commissioners, with the larger two agencies – SRSD and RVSD – each being allocated two
representatives of its choosing.
Table 6-2: Central Marin Sanitation Agency Board of Commissioners
Member Position Member Agency
Eli Beckman Chair SD2
Dean DiGiovanni Vice-Chair SRSD
Mary Sylla Secretary RVSD
Maribeth Bushey Commissioner SRSD
Doug Kelly Commissioner RVSD
Marin LAFCo 29 Central Marin Wastewater Study
Final February 2025
Administration
CMSA appoints an at-will General Manager to oversee all agency operations. The current
General Manager, Jason Dow, was hired as an engineer in June 1993 and later was appointed to
the General Manager position by the Commission in 2002 and is full-time. The General
Manager currently oversees 48 other full-time employees, and this includes four senior
management support positions: Safety Specialist/Manager, Administrative Service Manager,
Treatment Plant Manager, and Technical Services Manager. The JPA’s current org chart can be
seen below in Figure 6-3.
Figure 6- 3: CMSA Organization Chart
Marin LAFCo 30 Central Marin Wastewater Study
Final February 2025
CMSA is currently in advanced discussions with the San Rafael Sanitation District towards a
service agreement for CMSA to “provide all staffing, regulatory compliance, Board support
coordination and services necessary for the proper management, administration, and operation of
SRSD including all owned and operated SRSD assets.” Due to the manner in which SRSD’s
labor contract is currently structured, the District has experienced significant difficulty over
recent years in recruiting and retaining employees. This difficulty led the District to exploring
options to ensure a high level of service would be maintained throughout its service area. Under
the most recent iteration of the proposed service agreement between the two agencies, CMSA
would agree to hire all of SRSD’s 17 current employees who would continue working in their
current capacity within the SRSD service area. Preliminarily, the agreement would be set up so
that SRSD would fully reimburse CMSA for all services provided including all overhead costs
for CMSA general services by way of monthly invoices provided to SRSD from CMSA. The
agreement also states that “The services provided to SRSD shall not result in increased costs to
other JPA members”. SRSD would also agree to remit payment to CMSA for any of the
unfunded pension liabilities for the transferring employees prior to the employees' transfer to
CMSA. The two agencies have enlisted the services of an independent consultant as well as
created an ad-hoc Committee of CMSA JPA Member Representatives to consider the JPA’s
Organization Development Future to continue to pursue this endeavor. To date, the Committee
has held four public meetings to discuss the subject matter, fine-tune the proposed agreement,
and continue to try to mitigate any possible disruptions that could arise. The proposed agreement
would hold an initial 5-year term. The preliminary proposed org chart for what this agreement
would entail in the initial phase can be seen below in Figure 6-4.
Marin LAFCo 31 Central Marin Wastewater Study
Final February 2025
Figure 6- 4: Draft CMSA Organization Chart
6.7 ACCOUNTABILITY AND TRANSPARENCY
The Central Marin Sanitation Agency makes a concerted effort to maintain high accountability
and transparency in all of its activities. The Agency’s website maintains a robust web presence
with multiple pages dedicated to the JPA (cmsa.us). The CMSA web pages provide extensive
documentation and information on Board meetings, financial reports, services, projects, studies,
and more. Additionally, CMSA has been awarded recognition from the Government Finance
Officers Association (GFOA) for its financial reporting, and a Platinum Peak Performance
Award from the National Association of Clean Water Agencies for an exceptional NPDES
permit compliance record. At this time, CMSA is meeting all of the transparency requirements
of a public agency for the State of California.
Meeting and Agendas
The CMSA Board of Commissioners meets regularly on the 2nd Tuesday of each month at 6:00
p.m. at the CMSA office at 1301 Andersen Drive in San Rafael. Special meetings are held as
needed to go over specific topics. Meeting agendas and minutes can be found on the CMSA
website.
Marin LAFCo 32 Central Marin Wastewater Study
Final February 2025
6.8 FINANCIAL OVERVIEW
Over the course of the study window (past 5 fiscal years), CMSA has maintained increases in
total net position each year, with the exception of fiscal year 2019-20. The Agency implemented
a two-year budget cycle format beginning in FY 2020. All operating and capital activities of
CMSA are included in the approved biennial budget, along with a 10-year capital improvement
program and a 10-year financial forecast model. The FY 2024 and 2025 budgets were crafted
through the incorporation of a 5-year revenue plan that currently forecasts through FY 2028.
Strictly operationally, CMSA’s revenues have outpaced expenditures in each of the past five
fiscal years, by an annual average of approximately $1,783,176. The average annual operating
revenues for the Agency over the 5-year period were $19,765,119. The most significant
apportionment (approximately 89% annually) of the Agency’s revenue comes from service
charges paid to the Agency by its members. An additional eight percent comes from CMSA’s
contract maintenance with local agencies for collection system operation and source control
services. The remaining amounts are produced from fees charged for permitting and site
inspections, organic waste and septage tipping fees, and renewable energy sales. The primary
annual operating expenses for CMSA are Salaries and Benefits (53%), and Operations Supplies
and Services (9%). The projected total revenue for the Agency for fiscal year 2024-25 is
$23,518,1008. A breakdown of the past 5 years of operational revenues and expenses can be
seen below in Table 6-3.
Table 6-3: CMSA Revenues and Expenditures from the Past Five Fiscal Years
Operating FY2018-19 FY2019-20 FY2020-21 FY2021-22 FY2022-23 Averages
Revenue
Service $16,400,143 $16,974,164 $17,578,817 $18,183,132 $18,819,541 $17,591,159.40
Charges
Contract $1,067,515 $1,401,010 $1,670,204 $2,126,787 $1,856,889 $1,624,481.00
Maintenance
Other $434,012 $427,699 $602,417 $556,030 $727,233 $549,478.20
Revenues
Total $17,901,670 $18,802,873 $19,851,438 $20,865,949 $21,403,663 $19,765,118.60
Operating FY2018-19 FY2019-20 FY2020-21 FY2021-22 FY2022-23 Averages
Expenses
Salaries and $8,486,703 $9,925,545 $9,679,736 $8,619,869 $11,105,246 $9,563,419.80
Benefits
Operations $1,436,895 $1,638,012 $1,364,543 $1,510,280 $2,098,928 $1,609,731.60
Supplies and
Services
Repairs and $1,034,818 $588,963 $654,095 $1,344,474 $650,455 $854,561.00
Maintenance
Permit Testing $144,968 $178,099 $176,099 $198,248 $204,105 $180,303.80
and
Monitoring
8 CMSA Operating and Capital Budget; Pg 47
Marin LAFCo 33 Central Marin Wastewater Study
Final February 2025
Insurance $111,545 $134,522 $380,764 $445,916 $410,435 $296,636.40
Utilities and $454,082 $495,207 $263,560 $591,547 $446,020 $450,083.20
Telephone
General and $774,050 $736,513 $647,269 $840,867 $792,304 $758,200.60
Administrative
Depreciation $4,110,575 $4,128,150 $4,221,630 $4,299,319 $4,585,208 $4,268,976.40
and
Amortization
Total $16,553,636 $17,825,011 $17,387,846 $17,850,520 $20,292,701 $17,981,942.80
Debt
As of June 30, 2023, CMSA was carrying $60,086,943 in long-term liabilities. This amount is
inclusive of net pension and other post-employment benefits (OPEB) liabilities as well as
compensated absences. The sources of the Agency’s long-term liabilities are outlined below.
• 2015 Refunding Revenue Bonds - In March of 2015, CMSA issued $49,310,000 in Series
2015 revenue Bonds. The Bonds were used to refund the Series 2006 Revenue Bonds
whose proceeds were used to finance improvements to the wastewater treatment and
disposal system to increase capacity for wet weather flows, to pay costs of issuance of the
Bonds and for certain other capital projects to provide treatment capacity, replace capital
assets at the end of service life, and to make other capital improvements.
• 2020 Revenue Bonds – In November of 2020, CMSA issued $9,115,000 in Series 2020
Revenue Bonds. The Bonds were used primarily for improvements to the treatment plant
and for certain other capital improvements.
• 2022 Pension Obligation Bonds – In April of 2022, CMSA issued $9,432,000 in private
placement Series 2022 taxable pension Obligation Bonds. The bonds were used solely for
reducing the Agency’s unfunded actuarial pension liability by paying off a significant
portion of the balance.
• Net Pension Liability – CMSA provides a pension plan for employees and is part of the
California Public Employees Retirement System (CalPERS). CalPERS provides
retirement, disability, and death benefits based on the employee’s years of service, age, and
final compensation. As of measurement year ended June 30, 2022, CMSA’s Net Pension
Liability is $6,951,524. CMSA’s pension-funded ratio is approximately 87.3%. The
Agency further funds an Internal Revenue Code (IRC) Section 115 pension trust to prefund
its pension liability. As of fiscal year, ended June 30, 2023, the balance within the
Agency’s pension trust is $207,709, which adds to the Agency’s pension-funded ratio to
87.7%. The Agency expects to continue funding its IRC Section 115 trust in future years
to manage its pension liability.
• Other Post-Employment Benefits (OPEB) – CMSA provides other post-employment
benefits to its retirees. As of measurement year ended June 30, 2022, the Agency’s Net
OPEB liability is $1,569,984, with a funding ratio of 65.9%. The OPEB Plan provides
retiree medical reimbursement to eligible employees either at both the single payer Kaiser
medical rate and required CalPERS medical contribution rate, or the required CalPERS
medical contribution rate and 1.5% contribution to a health reimbursement trust account.
Marin LAFCo 34 Central Marin Wastewater Study
Final February 2025
Employees hired after January 1, 2010, are to receive the required CalPERS medical
contribution rate and 1.5% contribution to a health reimbursement trust account. The
health reimbursement account contributions are performed on a pay-as-you-go basis and
are excluded from the actuarial figure. The Net OPEB Liability is expected to significantly
decrease by 2039 as a result of the health reimbursement account update and the Agency
prepares an OPEB funding plan to manage its expected funding ratio by contributing to or
withdrawing from its IRC Section 115 OPEB trust fund. There are 82 total employees,
both active and inactive, within the District’s OPEB plan.
While technically not yet on the books, CMSA is planning in FY 20269 to issue $13 million in
revenue bonds to continue the financing of its 10-year capital improvement program which
currently contains 46 projects carrying an estimated total cost of $75.8 million.
9 CMSA ACFR 2023; Pg 40
Marin LAFCo 35 Central Marin Wastewater Study
Final February 2025
7.0 MURRAY PARK SEWER MAINTENANCE DISTRICT
7.1 OVERVIEW
In December of 2019, Marin LAFCo approved the annexation10 of the Murray Park Sewer
Maintenance District (MPSMD) to the Ross Valley Sanitary District (RVSD). Information
regarding MPSMD can be found within the RVSD agency profile section of this study.
10 Marin LAFCo Resolution 19-08
Marin LAFCo 36 Central Marin Wastewater Study
Final February 2025
8.0 ROSS VALLEY SANITARY DISTRICT
8.1 OVERVIEW
The Ross Valley Sanitary District was formed in 1899 as an independent special district under
Section 6400 of the California State Health and Safety Code. The District provides wastewater
collection to the Town of Fairfax, the Town of Ross, the Town of San Anselmo, the City of
Larkspur, and the unincorporated communities11 of Sleepy Hollow, Kentfield, and Greenbrae.
The District is one of three member agencies that comprise the Central Marin Sanitation Agency
which is a joint powers authority (JPA). The District’s jurisdictional boundary encompasses just
under 27 square miles. The last municipal service review that included Ross Valley Sanitary
District was conducted in 2017.
Table 8-1: Ross Valley Sanitary District Overview
Ross Valley Sanitary District
Primary Contact: Steve Moore Phone: (415)-259-2949
Mailing Address: 1111 Andersen Drive, San Rafael
Formation Date: May 27, 1899
Services Provided: Wastewater Collection
Service Area: 17,120 acres Population Served: ≈47,000
8.2 FORMATION AND DEVELOPMENT
The Ross Valley Sanitary District’s service area was originally a sparsely developed rural area
that was home to a handful of ranchers and loggers in the early 1800s. The land that Marin
County residents now refer to as the Ross Valley, originally owned by Mexico, was gifted in
1840 to an English settler by the name of John Rodgers Cooper as part of a 9,000-acre land grant
referred to as the Rancho Punta de Quentin Canada de San Anselmo. In 1857, James Ross
purchased a significant apportionment of the land grant for $50,000. Upon Ross’s passing in
1862, the majority of his land holdings were sold off to newer settlers in the area and it would
thus garner its name as Ross Valley.
The initial urban development in the area began in 1875 with the completion of the North Pacific
Railroad that connected the area that is now the City of Sausalito to the City of San Rafael. At
the time of the railroad’s completion, there was an estimated total of residents throughout the
Ross Valley of less than 1,000. A main hub for the railroad was located in the Town of San
Anselmo. This station allowed passengers less than an hour-long journey to San Francisco by
way of connecting to the ferry station to the south. This new accessibility led to an increase in
demand to settle in the area and the corresponding subdividing of lots to meet the demand. By
the latter stages of the 1890s, the population in the area had grown to just under 2,000, and the
added wastewater runoff was becoming problematic for the local creeks to handle. In addition,
11 While not a formally census-designated place, the District also provides service to the unincorporated
developments outside of the jurisdictional boundary of the Town of Fairfax and the Town of San Anselmo.
Marin LAFCo 37 Central Marin Wastewater Study
Final February 2025
the local water quality – particularly that of the San Anselmo Creek, which had become a
primary source for the region’s growing water provider, Marin County Water Company – was
seeing an increase in adverse effects. This led local landowners to petition the State Legislature
to utilize the recently established Sanitary District Act of 1891 to create a solution. In 1899, the
petition was confirmed by the voters, and the Ross Valley Sanitary District12 was formed even
before a single sewer main had been constructed. Not long after the formation, work began to
construct the District’s first 10-inch trunk line that would stretch from the community of Fairfax
south to the community of Greenbrae, allowing wastewater discharge into a deep-water slough of
Corte Madera Creek.
The Ross Valley continued to grow in the early 1900s, with the Town of San Anselmo formally
incorporating in 1907, followed by the incorporation of the Town of Ross and the City of
Larkspur in 1908. With this steady growth, the practice of discharging untreated wastewater into
the San Francisco Bay became untenable, and in 1922 a bond measure was passed to release
$450,000 to the District for the construction of an additional 7.5 miles of sewer line as well as a
wastewater treatment facility in Greenbrae to provide basic screening of wastewater before
discharging.
The Town of Fairfax was incorporated in 1931 and, not long after in 1937, the completion of the
Golden Gate Bridge connecting the City of San Francisco north to Marin County created an
influx of development demand throughout the Ross Valley. The population of approximately
2,000 in 1900 ballooned to over 12,000 by 1940. In order to meet the increasing demands, in
194513 RVSD, in collaboration with the City of Larkspur and the Sanitary District No. 2 of
Marin County, constructed a second wastewater facility at Larkspur Landing to provide
secondary treatment before discharging into the Corte Madera estuary. This facility would
undergo several expansions over the following decades until its decommissioning in 1984.
As populations continued to grow, not just in RVSD’s service area but throughout the greater
Bay Area at the time, significant concerns began to arise surrounding the manner in which
agencies were handling wastewater discharges. Resulting regulations such as the Clean Water
Act of 1972 and the National Pollutant Discharge Elimination System (NPDES) added much-
needed restrictions to help regulate the treatment of wastewater discharges into surface waters.
The new legislation simultaneously provided a funding mechanism for local agencies to receive
monies to construct the new facilities that would be necessary to meet the updated regulations
that required all discharges to meet enhanced standards. Given these circumstances, in 1979
RVSD – along with Sanitary District No. 2 of Marin County, the City of Larkspur, and the San
Rafael Sanitation District – formed the Joint Powers Authority (JPA) known as the Central
Marin Sanitation Agency. Soon after the official formation of CMSA in October of 1979, the
newly formed agency applied for grant funding for the construction of a new treatment plant
12 The Ross Valley Sanitary District was originally formed as the Sanitary District No. 1 of Marin County. It was not
until February of 2018 that the District adopted a resolution to formally change its name. For the sake of
uniformity, the District will be referred to as Ross Valley Sanitary District (RVSD) throughout the course of this
section.
13 This facility was completed and began operating in 1948.
Marin LAFCo 38 Central Marin Wastewater Study
Final February 2025
facility. Of what would eventually amount to a total construction cost of $84 million for the new
facility, approximately 87.5% of the total cost was funded by federal and state clean water
grants. The new treatment plant, located on San Quentin Point, began operation in January of
1985. At this time RVSD deactivated the Larkspur Landing treatment facility and redirected all
wastewater flows to the CMSA wastewater facility.
On April 1st, 1993, Marin LAFCo approved14 the annexation of the City of Larkspur Sanitation
Area to the Ross Valley Sanitary District. The City of Larkspur would retain its voting
membership status within CMSA until December 2018, at which time the Larkspur City Council
approved a resolution to withdraw the City from CMSA. The updated JPA agreement was
approved by the CMSA member agencies in January 2020.
In December of 2019, Marin LAFCo approved the annexation15 of the Murray Park Sewer
Maintenance District (MPSMD) to RVSD. MPSMD is a small residential area of just under 60
acres between the City of Larkspur and Kent Woodlands. The District was created by the Marin
County Board of Supervisors in 1949 and includes about 6,000 feet of sewer pipelines and serves
91 living units.
Figure 8- 1:Ross Valley Sanitary District Jurisdictional Boundary and Sphere of Influence
14 Marin LAFCo Resolution 92-7
15 Marin LAFCo Resolution 19-08
Marin LAFCo 39 Central Marin Wastewater Study
Final February 2025
8.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE
The Ross Valley Sanitary District’s jurisdictional boundary encompasses approximately 26.75
square miles of both incorporated and unincorporated Marin County. The District’s service area
includes five land use authorities within the jurisdictional boundary. The County of Marin
accounts for approximately 41% of all RVSD lands and includes the communities of Kentfield,
Sleepy Hollow, Greenbrae, and all of the unincorporated lands surrounding the Town of Fairfax.
The municipalities of the Town of San Anselmo, the Town of Fairfax, the City of Larkspur, and
the Town of Ross comprise the remainder16 of the District’s jurisdictional lands.
While not yet formally approved, through a collaborative effort between Sanitary District No 2.,
RVSD, and Marin LAFCo, a tentative agreement is in place pending approvals for a total of 7
parcels that are currently within the jurisdictional boundary of SD2 to be transferred to RVSD
due to RVSD being the agency that is providing service to those parcels. Through the work of a
multi-year dye testing project by both SD2 and RVSD staff, it was determined that these parcels
were not receiving service from the jurisdiction in which they resided. The collaborative effort
between the three agencies has allowed for the development of a tax exchange agreement in
order to reorganize the parcels into their proper jurisdiction. The formal reorganization requires
a sphere of influence update. This update coincided with the timeline of this study, and as such
the formal approval of this reorganization is tentatively planned for the early part of 2025.
The District’s sphere of influence was established in 1985 as part of Marin LAFCo’s initial
sphere of influence studies for special districts throughout Marin County. The sphere was
subsequently amended in 2006 following the Ross Valley Area Municipal Service Review to be
coterminous with the District’s boundaries with the addition of the Murray Park Sewer
Maintenance District area and the San Quentin Village Sewer Maintenance District/San Quentin
Rehabilitation Center. This amendment included the Commission labeling this as an “interim
sphere of influence” in order to signify its support of the ongoing exploration of the
consolidation of the collection agencies in Central Marin. The most recent update of the sphere
of influence occurred in 2017 and added all of the area of 238 Summit Drive to the District’s
sphere following a reorganization of a number of parcels between the District and SD2.
8.4 GROWTH AND POPULATION
The Ross Valley Sanitary District provides service to four of the eleven incorporated towns/cities
in Marin County (Fairfax, Larkspur, Ross, San Anselmo) as well as the two census-designated
places of Kentfield and Sleepy Hollow. The District also provides service to the community of
Greenbrae as well as the unincorporated developments surrounding the Town of Fairfax. While
the communities of Kentfield and Greenbrae may have local distinctions separating one from the
other, the US Census Bureau recognizes both of these spaces as a single census-designated place
for population data. The population change data for the cities, towns, and census-designated
places within the District’s boundary from 2010 and 202417 can be seen below in Table 8-2.
16 The District also has approximately 15 parcels in the City of San Rafael currently within its jurisdictional
boundary.
17 2024 data is based upon State of California Department of Finance 2024 Estimates.
Marin LAFCo 40 Central Marin Wastewater Study
Final February 2025
Table 8-2: Population Changes as Single Census-Designated Areas for 2010 and 2024
Community Name 2010 2024
Sleepy Hollow 2,384 2,401
Kentfield/Greenbrae 6,485 6,808
Town of Fairfax 7,441 7,371
Town of Ross 2,415 2,272
Town of San Anselmo 12,336 12,426
City of Larkspur 11,926 12,655
The remaining development potential within each of the planning areas within the District’s
boundary (both incorporated and unincorporated), while relatively minimal based upon the
number of remaining undeveloped parcels zoned for residential development, has experienced
recent changes with the majority of Cities/Towns as well as Marin County itself having adopted
updated housing elements that included planning for accommodations of the housing mandates
from the State. The Association of Bay Area Governments (ABAG) has designated a need for a
total of 3,569 additional housing units in unincorporated Marin County by 2031 within the
Regional Housing Needs Allocation (RHNA) plan. This number is 907 units shy of what Marin
County had deemed as the total buildout for unincorporated Marin County. Of those 3,569 units,
35318 of those have identified sites for development within the unincorporated spaces in Ross
Valley Sanitary District’s sphere of influence. Meanwhile, the additional housing unit mandates
for each of the incorporated spaces within the District’s sphere of influence create a sum total of
2,41319 and are as follows:
• Town of Fairfax – 490
• City of Larkspur – 979
• Town of San Anselmo – 833
• Town of Ross – 111
The current projection in the hypothetical scenario that each of the member agencies (including
RVSD) within the Central Marin Sanitation Agency were to be developed to their maximum
buildout potential, the additional dry weather flow would be approximately 0.18 million gallons
per day20. Given its current average dry weather flows as well as the permitted allowances for
flows, CMSA has the capacity to accommodate this level of growth. As far as growth within
strictly RVSD, the District’s EDU levels have seen a minimal increase over the past 10 years,
with a total EDU count of 21,940 in 2014 and 22,114 in 2023. In that same time frame, the
District maintained an average annual wastewater flow to CMSA of 1,995.7 million gallons.
Over the course of the study window, the District’s total number of service connections has
increased by 71.
18 Marin Countywide Plan; 2023-2031 Housing Element; Pg. 210
19 ABAG Final RHNA Plan
20 Marin Countywide Plan; 2023-2031 Housing Element; Pg. 115
Marin LAFCo 41 Central Marin Wastewater Study
Final February 2025
8.5 MUNICIPAL SERVICES
Wastewater Collection
Ross Valley Sanitary District provides wastewater collection to all residents and businesses
within its jurisdictional boundary. The District has a total of 15,999 service connections. In
total, the District’s sewer infrastructure is composed of approximately 199 miles of mainline and
trunk line and 7.3 miles of force main pipe with approximately 66% of all the pipes being 6”
diameter or less, 20% being 8”, 9% ranging from 9”-18”, and 5% being greater than 18” in
diameter. The pipes throughout the District vary between vitrified clay (VCP), high-density
polyethylene (HDPE), ductile iron (DI), cast iron (CIP), and polyvinyl chloride (PVC) among
others. There are 5 major pump stations owned and operated by the District, as well as 14
smaller pump and lift stations. The District’s sewer service rates were last adjusted on July 1,
2024, as the first year of what is to be a 5-year rate schedule following a service rate study that
was presented to the RVSD Board in May of 2024. The District has two distinct service rate
zones: the Ross Valley zone and the Larkspur zone. The Larkspur zone is administered higher
rates as the District does not receive any of the ad-valorem from property taxes in that area as
part of the annexation agreement. The Ross Valley rate zone does provide ad-valorem to the
District, so in order to achieve equitable costs to all of its customers, the District utilizes this
two-rate zone structure. The updated rate schedule calls for a 4% annual increase from 2024 to
2026, followed by a 3.8% increase in 2027, and 3,5% in 2028. For FY 2024-25, a single-family
home in the Ross Valley rate zone could expect to see a sewer service charge of $1,238, while
the same home in the Larkspur rate zone would see a charge of $1,773.
Over the past five fiscal years, the District has replaced a total of approximately 17 miles of pipe
within its boundary as a product of its Capital Improvement Plan. The District maintains a ten-
year capital improvement plan, with the current plan running through fiscal year 2033-34.
Within that span, the District has plotted capital improvements that include funding allocations
of $66.4 million for gravity sewer improvements, $9.8 million for force main sewer
improvements, $18.7 million for pump station improvements, and $12.9 million for upgrades to
the District’s facilities, vehicle fleet, and other capital assets.
In May of 2013, the Regional Water Board issued a Cease-and-Desist Order (CDO) to the
District in response to annually reoccurring excessive sewer system overflows (SSO). The CDO
contained a list of specific actions and best practices for the District to implement in order to
minimize the number of future SSOs. One of the requirements was the development of an
Infrastructure Asset Management Plan (IAMP). Through the implementation of the IAMP,
which was updated in 2021, the District has made significant improvements in both
infrastructure and operations. The risk points identified in the IAMP aid the district in
developing its Capital Improvement Plan (CIP). In FY 2023, the District’s Capital Budget
expenditures totaled $10,733,288. Over the course of the past five fiscal years, the District has
experienced a total of 63 sanitary sewer overflows (25 dry weather and 38 wet weather) totaling
approximately 172,187gallons. While a number of the sewer collection agencies throughout
Marin County contract with private contractors for sewer system overflow response, the
District’s in-house staff are trained and respond to all incident reports within the District’s
Marin LAFCo 42 Central Marin Wastewater Study
Final February 2025
boundaries. The District is making continual efforts to upgrade the infrastructure throughout its
service area in order to minimize inflow and infiltration as well as other structural defects. In the
past 5 years, the District has restored 34.3 miles of pipe and has cleaned 910 miles of pipes.
Murray Park Sewer Maintenance District
In December of 2019, Marin LAFCo approved the annexation21 of the Murray Park Sewer
Maintenance District (MPSMD) to RVSD. The MPSMD’s jurisdictional boundary spanned
approximately 60 acres with a population of 193 and is generally considered part of the
unincorporated community of Kentfield. MPSMD’s formation was approved by the County of
Marin’s Board of Supervisors in 1949 as a means for landowners to self-tax themselves for
purposes of constructing and operating a community wastewater collection system. The initial
collection system for MPSMD was constructed in early 1951 with the County of Marin’s Public
Works Department overseeing all operational and maintenance activities. In March of 1975,
MPSMD entered into a service agreement with the City of Larkspur. This agreement transferred
operational management of MPSMD’s collection system and wastewater flows to Larkspur in
exchange for an annual service fee based on the number of dwelling units within the District.
Following the annexation of the City of Larkspur to RVSD in 1993, RVSD became the successor
to the City of Larkspur’s agreement to provide operational management of MPSMD’s collection
system and wastewater flows in August 1993.
The MPSMD collection system includes approximately 6,000 feet of lines ranging in size from
four to eight inches. The lines are all gravity feed with no public pump stations. All wastewater
generated from the collection system is conveyed for treatment to CMSA. There are a total of 89
service connections, with all but one serving residential uses. Upon being annexed into RVSD,
MPSMD had a fund balance of $315,301 that was transferred to RVSD with language in the
annexation agreement restricting the use of those funds strictly to MPSMD. Residential
customers within MPSMD’s area paid an annual rate of $472 each, which totals $43,896 in total
rate collections within the area. This rate is significantly (approximately 54%) less than what the
RVSD rate is for the service in the Ross Valley rate zone. As such, for the four fiscal years
leading up to the rate restructuring, an apportionment of the funds that were transferred from
MPSMD to RVSD was used to subsidize the rate shortfall. In total, $238,737 has been allocated
to this rate subsidy. An additional $111,492 of the transferred funds was allocated to the Pump
Station 14 Rehabilitation Project as the Murray Park system flows into pump station 14 in order
to get to the CMSA plant. The Murray Park system represents 4.9% of the total flows received
at pump station 14, and thereby was charged 4.9% of the total cost of the pump station
rehabilitation, which was completed in FY 2023/24. As of October 11, 2024, all of the
transferred funds have been allocated to support the MPSMD.
After the preparation of a sewer rate study and a duly noticed Prop 218 process, the RVSD Board
of Directors adopted Ordinance 102, updating the District’s sewer service rate schedule. This
21 Marin LAFCo Resolution 19-08
Marin LAFCo 43 Central Marin Wastewater Study
Final February 2025
rate schedule became effective on July 1, 2024. At that time, the former MPSMD area became
included in the Ross Valley rate zone for the District.
8.6 ORGANIZATION STRUCTURE
Board of Directors
The Ross Valley Sanitary District is an independent special district receiving oversight and
policy direction by way of a five-member Board of Directors that is elected to staggered four-
year terms by way of at-large elections within the service boundary. All directors are required to
be registered voters residing within the District’s jurisdictional boundary. Two of the Board
members are annually appointed to the Central Marin Sanitation Agency Commission, with the
remaining Board members serving as alternates. Based on data provided by the County
Department of Elections which span from 1972 to 2022, Ross Valley Sanitary District had 14
election cycles during that timeframe in which a formal election process was necessitated, 11
seats were appointed in lieu of an election, and the District’s Board necessitated zero
appointments to seats on the Board by the Marin County Board of Supervisors.
Table 8-3: Ross Valley Sanitary District Board of Directors
Member Position Term Expiration
Mary Sylla President April 2028
Doug Kelly Secretary April 2028
Michael Boorstein Director July 2026
Pamela Meigs Director July 2026
Thomas Gaffney Director July 2026
Administration
The Board of Directors of Ross Valley Sanitary District appoints the District’s General Manager
who leads and manages the District’s day-to-day operations. The General Manager for Ross
Valley Sanitary District is full-time and manages the other 35 FTE employees employed by the
District. The General Manager oversees the three operational departments of Engineering and
Inspection, Administration, and Operations and Maintenance. The General Manager also serves
as the District Engineer.
8.7 ACCOUNTABILITY AND TRANSPARENCY
The Ross Valley Sanitary District maintains a high level of accountability and transparency in all
its activities. The District website provides documentation on board meeting agendas and
minutes as well as financial reports, services, studies, sewer system management plan,
permitting, contracts, and more.
Meeting and Agendas
The Ross Valley Sanitary District Board of Directors meets regularly on the 3rd Wednesday of
each month at 5:00 p.m. in the District Administrative Office at 1111 Andersen Drive in San
Rafael. Special meetings are held as needed to go over specific topics. Meeting agendas and
minutes can be found on the District’s website.
Marin LAFCo 44 Central Marin Wastewater Study
Final February 2025
Annual Budget Review
The District’s budget, typically adopted no later than the June Board meeting each year, provides
overall control of revenue and expenditures including appropriations on a line-item basis and the
means of financing them. The District’s budgetary financial planning consists of a two-fund
system, planning for both operating and capital expenditures each year. The General Manager
presents financial reports to the Board every month to ensure budgetary compliance.
8.8 FINANCIAL OVERVIEW
Over the course of the study window (past 5 fiscal years of available audited financials), Ross
Valley Sanitary District has maintained increases in total net position each year and seen an
increase in unrestricted net position in that same time frame of approximately $6.2 million. The
District’s total annual revenues22 (operating and nonoperating) have outpaced operating
expenditures in each of the five fiscal years by an annual average of $5,429,789. These excess
funds are primarily allocated toward the District’s capital improvement projects and maintaining
the District’s target reserves. The average annual operating revenues for the District over the 5-
year period were $23,510,110, with a total increase of just over 26% in that span.
The primary revenue sources for the District are sewer service charges (70%) and property taxes
(25%) with permit and inspection fees, lease income by way of renting space within its
administrative building to Comcast Corporation, miscellaneous revenues, and investment income
supplementing the District’s total revenues at approximately 5%. The primary annual operating
expenses for Ross Valley Sanitary District are treatment costs (37%), Operating and
Maintenance (26%), and General and Administrative (12%).
Debt
As of June 30, 2023, RVSD carried a total long-term debt amount of $94,345,794. Below is a
description of the borrowings comprising that amount:
• 2023 State Revolving Fund Loan – In April of 2022, the District received approval
through a loan program sponsored by the California State Water Resources Control Board
for capital project financing in the amount of $1,708,256. The proceeds of the loan were
allocated to the refurbishment of existing wastewater collection and conveyance system
infrastructure.
• 2013 Revenue Bonds – In August of 2013, the District issued $17,780,000 of revenue
bonds in order to both provide new money for wastewater capital projects and refund
$9,103,322 of the District’s privately placed debt obligations. As of June 30, 2023, the
outstanding principal balance is $14,780,000.
• 2014 Revenue Bonds – In November of 2015, the District issued $30,155,000 of revenue
bonds in order to provide new money for wastewater capital projects. As of June 30, 2023,
the outstanding principal balance is $23,515,000.
22 As the District views its operating purpose is to provide wastewater collection and conveyance services that are
funded by sewer service charges, property tax and leasing revenues are classified as nonoperating within the
District’s accounting policies.
Marin LAFCo 45 Central Marin Wastewater Study
Final February 2025
• 2018 Revenue Bonds – In January of 2018, the District issued $21,870,000 of revenue
bonds in order to provide new money for wastewater capital projects. As of June 30, 2023,
the outstanding principal balance is $19,250,000.
• 2019 Revenue Bonds – In July of 2019, the District issued $31,455,000 of revenue bonds
in order to provide new money for wastewater capital projects as well as purchasing the
building at 1111 Anderson Drive for the District administrative offices, and also for the
completion of the remediation project at 2000 Larkspur Landing at the site of the District’s
former treatment plant. As of June 30, 2023, the outstanding principal balance is
$27,715,000.
The District plans a bond refunding in early 2025 for the 2013, 2014, and 2018 bonds, with an
anticipated total savings of approximately $7 million over the life of the bonds.
The District also provides a pension plan for employees and is part of the California Public
Employees Retirement System (CalPERS). CalPERS provides retirement, disability, and death
benefits based on the employee’s years of service, age, and final compensation. As of June 30,
2023, the District’s Net Pension Liability was $8,636262. As of the most recent CalPERS
actuarial Valuation on June 30, 2023, the District’s pension-funded ratio was 70.1% which does
not include the District’s Section 115 trust assets. The District’s CalPERS Section 115 Trust
holds irrevocable deposits for future pension contributions to achieve a Board policy funding
ratio of at least 90%. In addition to the pension plan, the District provides other post-
employment benefits (OPEB) to its retirees. As of June 30, 2023, the District carried a net
OPEB liability of $819,797. The District currently has 47 employees, both active and inactive,
in its OPEB plan.
A breakdown of the past 5 years of operational revenues and expenses can be seen below in
Table 8-4.
Table 8-4: Ross Valley Sanitary District Financial Information
Operating FY 2018-19 FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 Averages
Revenue
Sewer Service $20,565,156 $21,963,689 $23,547,004 $24,478,887 $25,965,473 $23,304,041.80
Charges
Permit and $173,389 $138,587 $152,053 $156,473 $183,369 $160,774.20
Inspection Fees
Other Operating $8,456 $39,111 $18,165 $63,386 $91,263 $44,076.20
Total $20,747,0010 $22,141,387 $23,717,222 $24,698,746 $26,240,105 $23,508,892
Operating FY 2018-19 FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 Averages
Expenses
Treatment $7,776,952 $8,026,987 $8,144,157 $8,462,641 $8,869,040 $8,255,955.40
Costs
Operating and $5,844,749 $6,128,753 $6,152,281 $6,884,268 $6,047,437 $6,211,497.60
Maintenance
Engineering $1,614,279 $1,443,706 $1,002,285 $1,137,982 $1,078,643 $1,255,379.00
and
Inspections
Marin LAFCo 46 Central Marin Wastewater Study
Final February 2025
Lateral $625,330 $515,929 $406,608 $237,500 $242,500 $405,573.40
Replacement
Grants
Provision for N/A N/A N/A $26,414 $4,729 $15,571.50
Uncollectable
Accounts
General and $3,353,756 $3,638,021 $3,333,796 $3,733,204 $2,960,311 $3,403,817.60
Administrative
Depreciation $3,058,862 $4,082,590 $4,613,779 $4,655,488 $4,469,692 $4,608,626.20
and
Amortization
Total $22,273,928 $23,835,986 $23,652,906 $25,137,497 $23,672,352 $24,156,420.70
Financial Audit
The Ross Valley Sanitary District annually has its financial statements audited by an outside
certified public accounting firm and currently contracts with Cropper Accountancy Corporation.
The most recent audited financial statement was prepared for the fiscal year ending June 30,
2023.
Marin LAFCo 47 Central Marin Wastewater Study
Final February 2025
9.0 SAN RAFAEL SANITATION DISTRICT
9.1 OVERVIEW
The San Rafael Sanitation District (SRSD) was formed in 194723 as a dependent special district
under Section 4700 of the California State Health and Safety Code. The District provides
wastewater collection to the central and southern areas of the City of San Rafael, including the
unincorporated areas of Country Club, Bayside Acres, and California Park. The District in effect
covers the portion of San Rafael south of Puerto Suello Hill to the southerly city limit. The
jurisdictional boundary encompasses just over 12.9 square miles. The District is one of three
member agencies that comprise the Central Marin Sanitation Agency which is a joint powers
authority (JPA). The last municipal service review that included the San Rafael Sanitation
District was conducted in 2017.
Table 9-1: San Rafael Sanitation District Overview
San Rafael Sanitation District
Primary Contact: Doris Toy Phone: (415)-454-4001
Mailing Address: 111 Morphew Street, San Rafael
Formation Date: May 26, 1947
Services Provided: Wastewater Collection
Service Area: 8,194 acres Population Served: 43,466
9.2 FORMATION AND DEVELOPMENT
The primary service area of the San Rafael Sanitation District, the City of San Rafael, is an area
that saw some of the earliest development within Marin County. Established in December of
1817, the Mission San Rafael Arcángel was founded as the 20th Spanish mission in what was
then the Spanish province of Alta California. It was constructed to provide treatment to the
Central Valley Native Americans who had fallen ill at Mission Dolores in San Francisco. Under
the leadership of Father Luis Gil, who was fluent in several Native American languages, the
mission quickly grew its residency to nearly 1,000 and gained its full mission status in 1822, just
a month prior to Alta California declaring independence from Spain as part of Mexico. Despite
the mission flourishing in its early years, following the Mexican Secularization Act of 1833, the
Mexican government took control of the California missions in 1834, and by 1844, Mission San
Rafael had been abandoned.
Following the American conquest of California, the area of San Rafael began to transition from a
mission settlement to a growing agricultural community and regional commerce hub. The
community officially incorporated as a city in 1874 with an initial resident count of 840, marking
the beginning of San Rafael’s development as an urban center. The arrival of the San Francisco
and North Pacific Railroad in 1879 significantly boosted the city’s growth and economic
prospects, allowing for easier transportation of goods and people between San Rafael and San
23 Marin County Board of Supervisors Resolution No. 938
Marin LAFCo 48 Central Marin Wastewater Study
Final February 2025
Francisco, as well as other areas of Northern California. The newfound ease of travel made
commuting to jobs in San Francisco possible and allowed thousands of San Franciscans to visit
San Rafael on weekends. By 1900, the population had surged to 3,879, an amount that
represented over one-fourth of the total population in Marin County at the time. By 1930, that
total had increased to just over 8,000. This rapid growth necessitated a more organized
wastewater management, and in 1947 the County of Marin’s Boundary Change Commission
approved the official service area of the District to include what was the City’s incorporated
boundary at the time, as well as adjacent unincorporated lands to the east towards Bayside Acres
and south to California Park. At the time of its formation, the District owned and operated two
smaller treatment plants.
By 1960, the population within SRSD’s service area had ballooned to 20,460. This growth, not
just in SRSD’s service area but throughout the greater Bay Area at the time, began to raise
significant concerns about the manner in which agencies were handling wastewater discharges.
Resulting regulations such as the Clean Water Act of 1972 and the National Pollutant Discharge
Elimination System (NPDES) added much-needed restrictions to help regulate the treatment of
wastewater discharges into surface waters. The new legislation simultaneously provided a
funding mechanism for local agencies to receive monies to construct the new facilities that
would be necessary to meet the updated regulations that required all discharges to meet enhanced
standards.
On October 15, 1979, SRSD joined three other neighboring agencies, the City of Larkspur,
Sanitary District No. 1 of Marin County, and Sanitary District No. 2 of Marin County, to form
the Joint Powers Authority (JPA)of the Central Marin Sanitation Agency. The JPA was created
for the purpose of planning, constructing, and operating wastewater treatment and disposal
services for its member agencies. Soon after its formation, the newly formed Joint Powers
Authority applied for grant funding for the construction of a new treatment plant facility. Of
what would eventually amount to a total construction cost of $84 million for the new facility,
approximately 87.5% of the total cost was funded by federal and state clean water grants. The
new treatment plant, located on San Quentin Point, began operation in January of 1985 with an
average dry weather flow capacity of 10 million gallons per day24 and a sustained peak
secondary treatment capacity of 30 million gallons per day.
On January 13, 1989, Marin LAFCo approved25 an application by SRSD for the annexation of
the area of China Camp State Park. The total annexation area added 1,160 acres to the District’s
jurisdictional boundary.
24 CMSA Facilities Master Plan Pg. 1-1
25 Marin LAFCo Resolution No. 89-2
Marin LAFCo 49 Central Marin Wastewater Study
Final February 2025
Figure 9- 1: San Rafael Sanitation District Jurisdictional Boundary and Sphere of Influence
9.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE
The SRSD jurisdictional boundary encompasses approximately 12.9 square miles of both
incorporated and unincorporated Marin County. The District’s service area includes three land
use authorities overlapping the jurisdictional boundary. The City of San Rafael accounts for a
majority of the total acreage in the District at approximately 60%, while the unincorporated
spaces within the District’s boundary, of which the County of Marin has general land use
authority, primarily make up the remaining approximately 39% of the District’s jurisdictional
area. The unincorporated neighborhoods within the boundary include the Country Club
neighborhood in the Central San Rafael basin east of Highway 101 off of Point San Pedro Road,
the Bayside Acres neighborhood just to the east of the Country Club area, and the California
Park neighborhood in the southern portion of the Central San Rafael basin west of Highway 101.
The Town of San Anselmo comprises less than 1% of the District’s boundary, with
approximately 25 parcels within the District.
The District’s sphere of influence was established in November of 1984 as part of Marin
LAFCo’s initial sphere of influence studies for special districts throughout Marin County. The
Marin LAFCo 50 Central Marin Wastewater Study
Final February 2025
initial sphere was coterminous with the District’s jurisdictional boundary. At the time, the
Commission gave the sphere the designation of “interim” to signify the belief that the District
should be reorganized with the other members of CMSA as the Central Marin Sanitation District,
combining the four members of CMSA into a single sanitation district with an appointed
governing board. The sphere received its first amendment in February of 1989 to include the area
of the recent annexation of China Camp State Park. The sphere was subsequently amended in
2006 following the San Rafael Area Municipal Service Review to be coterminous with the
District’s boundaries with the inclusion of the area of Sun Valley. This amendment included the
Commission labeling this as an “interim sphere of influence” in order to signify its support of the
ongoing exploration at the time of the consolidation of the collection agencies within CMSA.
9.4 GROWTH AND POPULATION
The San Rafael Sanitation District provides service to two of the eleven incorporated
towns/cities in Marin County (San Rafael and San Anselmo) as well as the unincorporated
neighborhoods of California Park, Country Club, and Bayside Acres. The area comprising the
District’s boundary is nearly coterminous with the areas that comprise ten U.S. Census Tracts. 26
The current27 total combined population of these tracts is 43,466. This amount is an increase of
1,749 (4.2%) from the 2010 population total of 41,717.
The remaining development potential within each of the planning areas within the District’s
boundary (both incorporated and unincorporated), while relatively minimal based upon the
number of remaining undeveloped parcels zoned for residential development, has experienced
recent changes with the majority of Cities/Towns as well as Marin County itself having adopted
updated housing elements that included planning for accommodations of the housing mandates
from the State. The Association of Bay Area Governments (ABAG) has designated a need for a
total of 3,569 additional housing units in unincorporated Marin County by 2031 within the
Regional Housing Needs Allocation (RHNA) plan. This number is 907 units shy of what Marin
County had deemed as the total buildout for unincorporated Marin County. There is currently
one identified site for RHNA-specific development within the unincorporated spaces in SRSD’s
sphere of influence28. Meanwhile, the additional RHNA housing unit mandates within the City
of San Rafael are 3,220. In its recently updated Housing Element, the City of San Rafael has
identified sites and projects that are suitable to accommodate 4,858 total units, with 1,957 of
these already having been approved or proposed. Of those 1,957, 677 are within the
jurisdictional boundary of SRSD.
The current projection in the hypothetical scenario that each of the member agencies (including
RVSD) within the Central Marin Sanitation Agency were to be developed to their maximum
buildout potential, the additional dry weather flow would be approximately 0.18 million gallons
per day29. Given its current average dry weather flows as well as the permitted allowances for
flows, CMSA has the capacity to accommodate this level of growth. As far as growth within
26 U.S. Census Tracts: 1121, 1122.02, 1122.03, 1122.04, 1110.01, 1110.02, 1090.02, 1090.01, 1101, 1102
27 2023 American Community Survey Data
28 Auburn Cove; 79 units
29 Marin Countywide Plan; 2023-2031 Housing Element; Pg. 115
Marin LAFCo 51 Central Marin Wastewater Study
Final February 2025
strictly SRSD, the District’s EDU levels, and annual wastewater flow totals have been relatively
static over the course of the past 5 years.
9.5 MUNICIPAL SERVICES
Wastewater Collection
San Rafael Sanitation District provides wastewater collection to all residents and businesses
within its jurisdictional boundary. In total, the District’s sewer infrastructure is composed of
approximately 134 miles of gravity sewer line and 13 miles of force main pipe with
approximately 91% of all the gravity sewer pipes being 12” in diameter or less, while the
majority (approximately 54%) of the force main pipes are greater than 12” in diameter. The
pipes throughout the District vary between vitrified clay (VCP), high-density polyethylene
(HDPE), ductile iron (DI), cast iron (CIP), and polyvinyl chloride (PVC) among others. There
are a total of 32 pump stations within the District. The District’s sewer service rates were last
adjusted on June 21st, 202430, by way of the adoption of Ordinance No. 59. The newly adopted
rate schedule became effective on July 1, 2024, and was the first-rate increase by the District
since 2017. The adopted rate schedule increased the District’s rate for an Equivalent Dwelling
Unit (EDU) for all customer classes from $860.63 to $963.91 in the first year, which is an
increase of 12%. This amount will undergo an annual increase through FY 2026-27 to an amount
of $1062.72 per EDU. The most recent available data from the district shows an EDU total of
19,334. Over the course of the study window, the average total annual volume of wastewater
flow from the District into CMSA is 1,588 million gallons.
From 2020-2024, the District experienced a total of 50 sanitary sewer overflows. These
overflows equated to approximately 161,982 gallons, with approximately 97,904 of those gallons
reaching the waters of the State.
9.6 ORGANIZATION STRUCTURE
Board of Directors
SRSD’s governance authority is established under the County Sanitation District act of 1923 and
codified under Public Health and Safety Code Sections 4700-4858. This principal act empowers
SRSD to provide a moderate range of municipal services upon approval by LAFCo. As of the
writing of this study, SRSD is authorized to provide only one municipal service, wastewater
collection. Any and all other latent powers enumerated under the principal act would need to be
formally activated by LAFCo before SRSD would be allowed to initiate service. Similarly,
should it ever seek to divest itself of directly providing wastewater services, SRSD would also
need to seek LAFCo approval.
SRSD has been governed since its formation in 1947 as a dependent special district with three
appointments to its Board of Directors with two made by the San Rafael City Council and the
third by the County Board of Supervisors. As the majority of District’s service area lies within
Marin LAFCo 52 Central Marin Wastewater Study
Final February 2025
both Marin County Board of Supervisors Districts 1 and 2 and a small amount within District 4,
the Marin County Supervisors that serve on the SRSD Board are appointees from one of those
two majority voting districts. As a member agency of the Central Marin Sanitation Agency, the
District appoints two members to CMSA’s Board of Commissioners. The SRSD Board meets on
the 3rd Friday of each month at 9:00 a.m. at the San Rafael City Hall located at 1400 Fifth
Avenue in San Rafael. A current listing of the SRSD Board of Directors can be seen below in
Table 9-2.
Table 9-2: San Rafael Sanitation District Board of Directors
Member Position Term Expiration
Kate Colin Chair December 2028
Maribeth Bushey Director December 2026
Katie Rice Director December 2024
Administration
SRSD appoints an at-will General manager to oversee all District operations. The current
District Manager, Doris Toy, was appointed by the Board in 2009 and is full-time. The General
manager oversees 16 other full-time employees, and this includes two senior management
support positions: Principal Civil Engineer and Operations and Maintenance manager. SRSD
contracts with the City of San Rafael for a number of staff support services including (but not
limited to) information technology, payroll, and human resources.
SRSD is currently in advanced discussions with the Central Marin Sanitation Agency towards a
service agreement for CMSA to “provide all staffing, regulatory compliance, Board support
coordination and services necessary for the proper management, administration, and operation of
SRSD including all owned and operated SRSD assets.” Due to the manner in which SRSD’s
labor contract is currently structured, the District has experienced significant difficulty over
recent years in recruiting and retaining employees. This difficulty led the District to explore
options to ensure a high level of service would be maintained throughout its service area. Under
the most recent iteration of the proposed service agreement between the two agencies, CMSA
would agree to hire all of SRSD’s 17 current employees who would continue working in their
current capacity within the SRSD service area. Preliminarily, the agreement would be set up so
that SRSD would fully reimburse CMSA for all services provided including all overhead costs
for CMSA general services by way of monthly invoices provided to SRSD from CMSA. The
agreement also states that “The services provided to SRSD shall not result in increased costs to
other JPA members”. SRSD would also agree to remit payment to CMSA for any of the
unfunded pension liabilities for the transferring employees prior to the employees' transfer to
CMSA. SRSD has enlisted the services of an independent consultant as well as CMSA has
created an ad-hoc Service Contract Development Committee to continue to pursue this endeavor.
To date, the Committee has held four public meetings to discuss the subject matter, fine-tune the
proposed agreement, and continue to try to mitigate any possible disruptions that could arise.
Marin LAFCo 53 Central Marin Wastewater Study
Final February 2025
The proposed agreement would hold an initial 5-year term. The preliminary proposed org chart
for what this agreement would entail in the initial phase can be seen below in Figure 9-2.
Figure 9- 2: Draft CMSA Organization Chart
9.7 ACCOUNTABILITY AND TRANSPARENCY
The San Rafael Sanitation District maintains a high level of accountability and transparency in
all its activities. The District website is housed within the website for the City of San Rafael, and
provides documentation on board meeting agendas and minutes as well as financial reports,
services, sewer system management plan, permitting, projects, and more.
Meeting and Agendas
The SRSD Board of Directors meets regularly on the 3rd Friday of each month at 9:00 a.m. at the
San Rafael City Hall located at 1400 Fifth Avenue in San Rafael. Special meetings are held as
needed to go over specific topics. Meeting agendas and minutes can be found on the District’s
website.
Marin LAFCo 54 Central Marin Wastewater Study
Final February 2025
9.8 FINANCIAL OVERVIEW
Over the course of the study window (past 5 fiscal years of available audited financials), San
Rafael Sanitation District has maintained increases in total net position each year which has been
driven primarily by its increases in capital assets and net investment in its infrastructure. In total,
the District has seen a growth in net position 29% from FYE 2019 to FYE 2023. The District
has also realized a significant increase in unrestricted net position of approximately 56% in that
same timeframe. The District’s total revenues have outpaced operating expenditures in each of
the five fiscal years. These excess funds are primarily allocated toward the District’s capital
improvement projects and maintaining the District’s target reserves. The average annual
operating revenues for the District over the 5-year period were $16,849,471 and saw a total
decline of approximately 1% in operating revenues over the course of the study window. The
recently enacted rate schedule will significantly bolster the District’s essentially stagnant
operating revenues over the course of the next five years. Conversely, the District’s
nonoperating revenues saw an increase of approximately 53% over the course of the study
window. This was due in large part to an anomalous influx of nonoperating revenues in FYE
2023 as investment returns from the Marin County Investment Pool experienced a large increase.
The primary revenue sources for the District are sewer charges (91%) and property taxes (7%)
with investment income and connection fees supplementing the District’s total revenues at
approximately 2%. The primary annual operating expenses for SRSD are sewage treatment
(54.9%), sewage collection (26.2%), depreciation and amortization31 (16%), and general and
administration (2.4%).
The District’s capital improvement program (CIP) has been proactively working towards
replacing the older pipes and rehabilitating pump stations, among other things, throughout the
boundary. The District adopted a policy in June of 2017 requiring transfers to separate reserve
accounts to provide funding for planned capital improvement projects. The transfers are based
on average annual expenditures projected for the subsequent ten years. One of the primary
objectives related to the recently updated rate schedule was to increase the District’s amount of
annual pipe replacement from 1.6 miles to 2.5 miles. The District has created three separate
capital improvement funds: the 80-Year Life-Cycle Program, the Pump Station and Force Main
Capital Improvement Program, and the Equipment Replacement Program. Each of these
targeted reserves has seen an increase in fund balance, with the 80-Year Life Cycle Program
totaling $20.6 million at the FYE 2023, the Pump Station and Force Main Program totaling $10.1
million, and the Equipment Replacement Program totaling $2.2 million. In FYE 2023, the
District totaled $6.43 million in capital expenditures.
31 Depreciation is shown as an operating expense in the financial statements in step with generally accepted
governmental accounting standards, and as such impacts - and often negatively - gross profit or total margin.
Depreciation takes into account the wear and tear on physical infrastructure, such as sewer lines, pumps, and
other capital equipment. Government accounting standards direct agencies to spread out the costs of replacing
these assets over the long term, which generates the term depreciation or amortization. The “charge” for using
these assets during the period is a fraction of the original cost of the assets based on the expected life of the assets
and presumably is rolled into the agencies’ fund balance at the end of the fiscal year and as part of the restricted
reserve.
Marin LAFCo 55 Central Marin Wastewater Study
Final February 2025
The District currently carries no long-term debt that has been reviewed by an independent
auditor, however, as a member agency of CMSA it shares in the debt service of the joint power’s
authority. Additionally, The District’s staff is provided by the City of San Rafael under a
contractual arrangement that requires the District to pay all related employee costs incurred by
the City on its behalf. Quarterly payments are made by the District to the City and include
amounts sufficient to cover the City’s currently required contributions to employee benefit plans,
including a portion for past service costs. During fiscal year 2014-15, the District and the City
agreed that SRSD was also responsible for unfunded obligations related to past service. Under
the agreement, this obligation will be funded and will correspond to the City’s required payments
to fund its pension and post-employment health benefits. As of June 30, 2023, the District’s
portion of the unfunded obligations was $2,002,944. A breakdown of the past 5 years of
operational revenues and expenses can be seen below in Table 9-3.
Table 9-3: San Rafael Sanitation District Total Revenues and Operating Expenditures Data
Revenue FY 2022-23 FY 2021-22 FY 2020-21 FY 2019-20 FY 2018-19 Averages
Sewer $16,638,611 $16,458,113 $16,945,721 $16,874,361 $16,964,083 $16,776,177.80
Charges
Property $2,129,197 $2,086,682 $1,888,197 $1,833,137 $1,727,221 $1,932,886.80
Taxes
Aid from $5,531 $5,568 $5,609 $5,719 $5,907 $5,666.80
Governmental
Agencies
Investment $1,328,202 ($406,535) $48,614 $876,369 $519,793 $473,288.60
Income (loss)
Miscellaneous $11,759 $0 $0 $489 $7,768 $4,003.20
Income
Connection $175,481 $517,752 $277,752 $175,217 $1,433,87132 $516,014.60
Fees
Total $20,288,781 $18,661,580 $19,165,893 $19,765,292 $20,658,643 $19,708,037.80
Operating FY 2022-23 FY 2021-22 FY 2020-21 FY 2019-20 FY 2018-19 Averages
Expenses
Sewage $2,850,158 $2,458,749 $3,923,907 $4,368,531 $3,923,907 $3,505,050.40
Collection
Sewage $7,770,615 $7,657,698 $7,480,877 $6,996,412 $6,687,210 $7,318,562.40
Treatment
Depreciation $2,443,272 $2,360,343 $2,075,305 $2,154,056 $1,889,198 $2,184,434.80
and
Amortization
General and $477,882 $415,897 $310,816 $334,264 $100,942 $327,960.20
Administration
Total $13,541,927 $12,892,687 $13,790,905 $13,853,263 $12,601,257 $13,336,007.80
32 There was a notable spike in connection fees in FYE 2019, primarily due to a one-time reimbursement from
Caltrans for a sewer line relocation project.
Marin LAFCo 56 Central Marin Wastewater Study
Final February 2025
Financial Audit
The San Rafael Sanitation District annually has its financial statements audited and contracts
with an outside certified public accounting firm, most recently Maze & Associates. The most
recent audited financial statement was prepared for the fiscal year ending June 30, 2023.
Marin LAFCo 57 Central Marin Wastewater Study
Final February 2025
10.0 SANITARY DISTRICT NO. 2 OF MARIN COUNTY
10.1 OVERVIEW
The Sanitary District No. 2 of Marin County (SD2) was formed in 1901 as an independent
special district under Section 6400 of the California State Health and Safety Code. The District
provides wastewater collection to the Town of Corte Madera as well as a portion of the Town of
Tiburon along Paradise Drive, a small number of parcels in the City of Larkspur, the
unincorporated Greenbrae area, and the unincorporated area of Paradise Cay. The District is one
of three member agencies that comprise the Central Marin Sanitation Agency which is a joint
powers authority (JPA). The District’s jurisdictional boundary encompasses just under 3.9
square miles. The last municipal service review that included Sanitary District No. 2 of Marin
County was conducted in 2017.
Table 10-1: Sanitary District No. 2 of Marin County Overview
Sanitary District No. 2 of Marin County
Primary Contact: R.J. Suokko Phone: (415)-927-5057
Mailing Address: 300 Tamalpais Drive, Corte Madera
Formation Date: January 21, 1901
Services Provided: Wastewater Collection
Service Area: 2,468 acres Population Served: ≈11,500
10.2 FORMATION AND DEVELOPMENT
The majority of SD2’s present-day service area's earliest motion towards development came in
1834 when the area of land that was then known as the Rancho Corte Madera del Presidio was
granted to the European settler, John Reed, but the Mexican Governor Jose Figueroa. The total
area of the land grant was 7,845 acres, and John Reed promptly shortened the name of his new
holdings to Corte Madera, which translates to “wood cutting”. Reed soon after completed the
construction of a sawmill in order to create lumber from the local redwood trees to sell for the
burgeoning construction within the City of San Francisco. As more and more area was cleared,
cattle grazing and other avenues of local farming became more prominent. By the time of the
State of California’s second official census in 1860, only a few dozen residents were calling the
area home, with Marin County as a whole having a population of just over 3,000.
The spur for the first real development of the Corte Madera area arrived with the completion of
the North Pacific Coast Railroad in 1875. This newfound access to travel that stretched through
Marin County and continued north gave residents of San Francisco the ability to travel by ferry
to Sausalito and then take the train to different locations within Marin. This included tracks that
ran directly along with is now Montecito Drive and the construction of a train station in 1885
where Montecito is now intersected by Tamalpais Drive. The area surrounding the train station
slowly developed into a small commercial area that grew outward to accommodate both the
area’s business owners as well as a growing number of laborers who now had daily access to
work in San Francisco.
Marin LAFCo 58 Central Marin Wastewater Study
Final February 2025
By 1900, the local population had grown to approximately 300 and there was a rapidly
increasing need to coordinate the collection and disposal of the raw sewage flows from the
downtown area that had formed around the train station. SD2’s formation was petitioned by the
local area landowners to the legislators for just this purpose. The template for these proceedings
had been laid locally just two years prior by the formation of the neighboring County Sanitary
District No. 1 of Marin County. Following this groundwork, a successful election was held, and
the formation of County Sanitary District No. 2 of Marin County was officially incorporated on
January 21, 1901.
In June of 1916, the Town of Corte Madera was officially incorporated and while the District
and the Town remained separate legal entities, they worked collaboratively in such areas as the
sharing of office space, equipment, and other facilities. The two agencies remained separate
until the late 1960s following the creation of the District Reorganization Act in 1965 as well as
changes to the Municipal Organization Act. These legislative changes allowed the District to be
reorganized into a dependent subsidiary district33of the Town of Corte Madera on January 15,
1969. By April 1, 1969, the former employees of the District became employees of the Town.
By 1970 there had been rapid population growth, with the Town of Corte Madera going from a
population of 1,933 in 1950 to 8,464 in 1970. This growth, not just in SD2’s service area but
throughout the greater Bay Area at the time, began to raise significant concerns about the manner
in which agencies were handling wastewater discharges. Resulting regulations such as the Clean
Water Act of 1972 and the National Pollutant Discharge Elimination System (NPDES) added
much-needed restrictions to help regulate the treatment of wastewater discharges into surface
waters. The new legislation simultaneously provided a funding mechanism for local agencies to
receive monies to construct the new facilities that would be necessary to meet the updated
regulations that required all discharges to meet enhanced standards.
On October 15, 1979, SD2 joined three other neighboring agencies, the City of Larkspur,
Sanitary District No. 1 of Marin County, and the San Rafael Sanitation District, to form the Joint
Powers Authority (JPA)of the Central Marin Sanitation Agency. The JPA was created for the
purpose of planning, constructing, and operating wastewater treatment and disposal services for
its member agencies. Soon after its formation, the newly formed Joint Powers Authority applied
for grant funding for the construction of a new treatment plant facility. Of what would
eventually amount to a total construction cost of $84 million for the new facility, approximately
87.5% of the total cost was funded by federal and state clean water grants. The new treatment
plant, located on San Quentin Point, began operation in January of 1985 with an average dry
weather flow capacity of 10 million gallons per day34 and a sustained peak secondary treatment
capacity of 30 million gallons per day.
On September 8, 2020, SD2 as well as the Town of Corte Madera entered into a settlement
agreement and mutual release of claims with the environmental advocacy non-profit, California
33 Marin LAFCo Resolution 68-21
34 CMSA Facilities Master Plan Pg. 1-1
Marin LAFCo 59 Central Marin Wastewater Study
Final February 2025
River Watch. The agreement outlined a number of specific action items for the District to
accomplish prior to the agreement’s termination date in 2027. Among other things, the
agreement committed SD2 to complete a full gravity pipe condition assessment by September of
202235 using closed-circuit television data that had been obtained within the previous 10 years.
It required SD2 to invest up to $5 million over a 5-year period to repair significantly defective36
gravity sewer lines. Additionally, SD2 was required to conduct a desktop study of the force
mains and pump stations that had not already been assessed, rehabilitated, repaired, or replaced
within the prior 10 years. The agreement required the updating of the District’s Sanitary Sewer
Master Plan (SSMP) within 120 days of the effective date of the agreement. The District’s
current SSMP was most recently updated in March of 2024 and holds numerous specific projects
that have been identified by the District in order to ensure the satisfaction of all of the items
agreed to within the 2020 settlement in conjunction with the District’s capital improvement
program.
35 The District’ completed the inspection of its 232,082 linear feet of gravity mains by November of 2021. The
assessment showed approximately 9% of that system as having Structural Quick Score 5 defects.
36 The qualification for “significantly defective” was defined as a Pipeline Assessment and Certification Program
(PACP) structural rating grade 5. The PACP rating system was developed by the National Association of Sewer
Service Companies and is a nationally recognized sewer pipeline condition rating system for CCTV inspections.
Marin LAFCo 60 Central Marin Wastewater Study
Final February 2025
Figure 10- 1: Sanitary District No. 2 of Marin County Jurisdictional Boundary and Sphere of Influence
10.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE
The SD2 jurisdictional boundary encompasses approximately 3.85 square miles of both
incorporated and unincorporated Marin County. The District’s service area includes seven land
use authorities overlapping the jurisdictional boundary. The Town of Corte Madera accounts for
a significant majority of the total acreage in the District. The Town of Tiburon and the City of
Larkspur comprise the remainder of the District’s incorporated jurisdictional lands. The
unincorporated spaces within the District’s boundary, of which the County of Marin has general
land use authority, make up the remaining approximately 20% of the District’s jurisdictional
area.
While not yet formally approved, through a collaborative effort between Sanitary District No 2.,
RVSD, and Marin LAFCo, a tentative agreement is in place pending approvals for a total of 7
parcels that are currently within the jurisdictional boundary of SD2 to be transferred to RVSD
due to RVSD being the agency that is providing service to those parcels. Through the work of a
multi-year dye testing project by SD2 staff, it was determined that these parcels were not
receiving service from the jurisdiction in which they resided. The collaborative effort between
the three agencies has allowed for the development of a tax exchange agreement in order to
Marin LAFCo 61 Central Marin Wastewater Study
Final February 2025
reorganize the parcels into their proper jurisdiction. The formal reorganization requires a sphere
of influence update. This update coincided with the timeline of this study, and as such the
formal approval of this reorganization is tentatively planned for the early part of 2025. In
addition to this, the District has identified 3 parcels outside of its boundary along Paradise Drive
as well as Ranch Road that it plans to submit an application for annexation. Lastly, the
Tamalpais Union High School District property that holds, among other structures, Redwood
High School, will be annexed into SD2, along with three surrounding parcels adjacent to the
property that will be transferred from RVSD to SD2.
The District’s sphere of influence was established in 1982 as part of Marin LAFCo’s initial
sphere of influence studies for special districts throughout Marin County. The initial sphere
included the totality of the District’s boundary as well as the Ring Mountain area that, at the
time, was proposed for development off Taylor Road. At the time, the Commission gave the
sphere the designation of “interim” to signify the belief that the District should be reorganized
with the other members of CMSA as the Central Marin Sanitation District, combining the four
members of CMSA into a single sanitation district with an appointed governing board. The
sphere was subsequently amended in 2006 following the Ross Valley Area Municipal Service
Review to be coterminous with the District’s boundaries. This amendment included the
Commission labeling this as an “interim sphere of influence” in order to signify its support of the
ongoing exploration at the time of the consolidation of the collection agencies within CMSA.
The most recent update of the sphere of influence occurred in 2017 and added all of the areas of
244, 246, and 260 Summit Drive to the District’s sphere following a reorganization of four
parcels between the District and RVSD.
10.4 GROWTH AND POPULATION
The Sanitary District No. 2 of Marin County provides service to three of the eleven incorporated
towns/cities in Marin County (Corte Madera, Larkspur, and Tiburon) as well as the
unincorporated community of Paradise Cay, and the Greenbrae Boardwalk area and Lucky Drive
areas. The area comprising the District’s boundary in the Paradise Cay area that is made up of
unincorporated lands as well as the Town of Tiburon is nearly coterminous with U.S. Census
Block Group 2 within Census Tract 1241. As such, population estimates for the District will be
projected using this area's population determinations. The town of Corte Madera has a 2024
population estimate from the California Department of Finance of 9,882, which is a 6.8%
increase from the Town’s population totals from the 2010 Census total of 9,253. Census Tract
1241; Block Group 2 has an estimated current population of 1,284, which is an 11.7% increase
from its population totals from the 2010 Census of 1,149.
The remaining development potential within each of the planning areas within the District’s
boundary (both incorporated and unincorporated), while relatively minimal based upon the
number of remaining undeveloped parcels zoned for residential development, has experienced
recent changes with the majority of Cities/Towns as well as Marin County itself having adopted
updated housing elements that included planning for accommodations of the housing mandates
from the State. The Association of Bay Area Governments (ABAG) has designated a need for a
total of 3,569 additional housing units in unincorporated Marin County by 2031 within the
Marin LAFCo 62 Central Marin Wastewater Study
Final February 2025
Regional Housing Needs Allocation (RHNA) plan. This number is 907 units shy of what Marin
County had deemed as the total buildout for unincorporated Marin County. There are currently
no identified sites for RHNA-specific development within the unincorporated spaces in SD2’s
sphere of influence. Meanwhile, the additional RHNA housing unit mandates for each of the
incorporated spaces within the District’s sphere of influence create a sum total of 81837 and are
as follows:
• Town of Tiburon38 – 9339
• Town of Corte Madera – 725
The current projection in the hypothetical scenario that each of the member agencies (including
RVSD) within the Central Marin Sanitation Agency were to be developed to their maximum
buildout potential, the additional dry weather flow would be approximately 0.18 million gallons
per day40. Given its current average dry weather flows as well as the permitted allowances for
flows, CMSA has the capacity to accommodate this level of growth. As far as growth within
strictly SD2, the District’s EDU levels, and annual wastewater flow totals have been relatively
static over the course of the past 5 years.
10.5 MUNICIPAL SERVICES
Wastewater Collection
Sanitary District No.2 of Marin County provides wastewater collection to all residents and
businesses within its jurisdictional boundary with the exception of approximately six parcels that
are currently known to be operating by way of a septic tank. In total, the District’s sewer
infrastructure is composed of approximately 45 miles of gravity sewer line and 4 miles of force
main pipe with approximately 91% of all the gravity sewer pipes being 12” in diameter or less,
while the majority (approximately 54%) of the force main pipes are greater than 12” in diameter.
The pipes throughout the District vary between vitrified clay (VCP), high-density polyethylene
(HDPE), ductile iron (DI), cast iron (CIP), and polyvinyl chloride (PVC) among others. There
are 4 major pump stations owned and operated by the district, as well as 15 other stations that are
classified as minor. The District contracts with the Central Marin Sanitation Agency for the
operation and maintenance of its pump stations as well as limited maintenance to the District’s
force mains. The District’s sewer service rates were last adjusted on May 21st, 202441, by way of
the adoption of Ordinance No. 49. Following the adoption of the District’s Sanitary Sewer
Master Plan in March of 2024 which outlined the necessary funding to ensure the District’s
continued operation, an independent consultant was contracted to produce a rate study report.
This report developed a five-year rate schedule which the District adopted. The adopted rate
increase was the first increase for the District since FY 2009-10. The updated rate schedule went
into effect on July 1, 2024, and increased the District’s rate for a Sewer Equivalent Unit (SEU)
37 ABAG Final RHNA Plan
38 4576 Paradise Drive
39 This amont is representative of just the sites designated for RHNA development for the Town that are within the
SD2 jurisdictional boundary.
40 Marin Countywide Plan; 2023-2031 Housing Element; Pg. 115
41 Resolution No. 04/2024
Marin LAFCo 63 Central Marin Wastewater Study
Final February 2025
for all customer classes from $498 to $697, which is an increase of 39%. This amount will
undergo an annual increase through FY 2028-29 to an amount of $1,233.02 per SEU. The most
recent available data from the district shows an SEU total of 6,155.
10.6 ORGANIZATION STRUCTURE
Board of Directors
The Sanitary District No. 2 of Marin County receives oversight and policy direction as a
subsidiary District to the Town of Corte Madera from the Corte Madera Town Council Members
as District Board Members. The District’s business matters are incorporated as part of the
Town’s regular meeting schedule, albeit as a separate entity within the same meeting space/day.
All directors are required to be registered voters residing within the District’s jurisdictional
boundary. One of the Board members is annually appointed to the Central Marin Sanitation
Agency Commission.
Table 10-2: Sanitary District No. 2 Board of Directors
Member Position Term Expiration
Eli Beckman President November 2026
Pat Ravasio Vice-President November 2026
Fred Casissa Director November 2024
Charles Lee Director November 2024
Rosa Thomas Director November 2026
Administration
The Director of Public Works for the Town of Corte Madera serves as the District Manager for
SD2 as a subsidiary district of the Town. Service activities directly performed by SD2 are done
so by way of the Corte Madera Public Works Department staff, or through contractual
agreements for services with both the Ross Valley Sanitary District and the Central Marin
Sanitation Agency.
10.7 ACCOUNTABILITY AND TRANSPARENCY
The Sanitary District No. 2 of Marin County maintains a high level of accountability and
transparency in all its activities. The District website is housed within the website for the Town
of Corte Madera and provides documentation on board meeting agendas and minutes as well as
financial reports, services, studies, sewer system management plan, permitting, contracts, and
more.
Meeting and Agendas
The SD2 Board of Directors meets regularly on the 1st and 3rd Tuesday of each month at 6:45
p.m. or upon conclusion of the Corte Madera Town Council Meeting. Meetings are held at the
Marin LAFCo 64 Central Marin Wastewater Study
Final February 2025
Town Hall Council Chambers at 300 Tamalpais Drive in Corte Madera. Special meetings are
held as needed to go over specific topics. Meeting agendas and minutes can be found on the
District’s website.
Annual Budget Review
The District’s budget, typically adopted no later than the June Board meeting each year in
alignment with the budget process for the Town of Corte Madera, provides overall control of
revenue and expenditures including appropriations on a line-item basis and the means of
financing them. The District’s budgetary financial planning consists of a two-fund system,
planning for both operating and capital expenditures each year. The District Manager presents
financial reports to the Board every month to ensure budgetary compliance.
10.8 FINANCIAL OVERVIEW
Over the course of the study window (past 5 fiscal years of available audited financials), Sanitary
District No. 2 of Marin County has maintained increases in total net position each year which has
been driven primarily by its increases in capital assets and net investment in capital assets. The
District’s total revenues have outpaced operating expenditures in each of the five fiscal years.
These excess funds are primarily allocated toward the District’s capital improvement projects
and maintaining the District’s target reserves. The average annual operating revenues for the
District over the 5-year period were $3,083,119 and saw a total decline of approximately 5% in
operating revenues over the course of the study window. The recently enacted rate schedule will
significantly bolster the District’s essentially stagnant operating revenues over the course of the
next five years. Conversely, the District’s nonoperating revenues saw an increase of
approximately 40% over the course of the study window.
The primary revenue sources for the District are property taxes (55%) and sewer user fees (40%)
with investment income and miscellaneous revenues supplementing the District’s total revenues
at approximately 4%. The primary annual operating expenses for SD2 are collection
maintenance (26%), treatment and disposal (23%), and depreciation (20%). The District’s
capital improvement program (CIP) has been proactively working towards replacing the older
pipes and rehabilitating pump stations, among other things, throughout the boundary. This
aggressive infrastructure focus by the District has resulted in the depletion of its unrestricted
fund balance by approximately 59% during the previous five years. Despite this, the District still
maintains a healthy unrestricted fund balance of over $5.6 million in addition to the District’s
$2.5 million emergency reserve. In its continued efforts to proactively improve the condition of
the District’s infrastructure throughout its boundary, on October 15, 2024, the District’s Board
approved an amendment to the approved budget for FY 2024-25. The amendment to the budget
allowed for the following updates:
• Add proceeds of Certificates of Participation in the amount of $10,000,000
• Add Carryover Capital Expenditures for Meadowsweet Trunk Sewer Rehabilitation
Project for $240,000.
Marin LAFCo 65 Central Marin Wastewater Study
Final February 2025
• Add Carryover Capital Expenditures for 2023 Madera Gardens Sewer Rehabilitation
Project for $16,525
• Add Other Capital Expenditures in the amount of $7,915,000
• Add Debt Service Payment in the amount of $380,757.
While during the FY 2024-25 budget review and adoption process, the District’s staff and Board
were of the plan to issue Certificates of Participation (COP) in order to finance capital projects,
the District did not finalize a bidder until late September42, thereby necessitating the budget
adjustment to add the funds to the current fiscal year. In addition, this influx of funds will also
increase the District’s planned capital expenditures in FY 2024-25 from $4,875,000 to
$13,046,525
The District currently carries no long-term debt that has been reviewed by an independent
auditor, however, as a member agency of CMSA it shares in the debt service of the joint powers
authority. This will change at the end of the current fiscal year as impacted by the issuance of
the COPs. A breakdown of the past 5 years of operational revenues and expenses43 can be seen
below in Table 10-3.
Table 10-3: Sanitary District No. 2 of Marin County Total Revenues and Operating Expenditures Data
Revenue FY 2018-19 FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 Averages
Property Taxes $3,410,344 $3,523,798 $3,719,195 $3,981,260 $4,239,909 $3,774,901.20
Sewer User Fees $3,050,716 $2,977,371 $3,207,792 $2,841,560 $2,891,162 $2,993,720.20
Investment $297,857 $240,239 $64,016 $36,804 $169,542 $161,691.60
Earnings
Other $94,592 $85,222 $127,068 $122,351 $67,542 $99,355.00
Total $6,853,509 $6,826,630 $7,118,071 $6,981,975 $7,367,939 $7,029,624.80
Operating FY 2018-19 FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 Average
Expenses
Administration $241,169 $360,970 $457,767 $262,425 $394,462 $343,358.60
and General
Collection $1,176,876 $1,951,027 $1,791,645 $1,222,452 $1,569,734 $1,542,346.80
Maintenance
Pump Station $362,515 $451,256 $406,885.50
Maintenance
CMSA Debt $668,608 $668,157 $668,382.50
Service
Utilities $177,396 $249,316 $213,356.00
42 On September 25, 2024, SD2 sold Certificates of Participation to Morgan Stanley in the total amount of
$10,000,000.
43 In FYE 2022, the District’s independent auditor updated the manner in which it calculated the annual revenues
and expenses by including the CMSA Debt Service in expenses, whereas it had previously been deducted from
nonoperating revenues. The firm also began including utilities and pump station maintenance as standalone line
items.
Marin LAFCo 66 Central Marin Wastewater Study
Final February 2025
Treatment and $972,624 $993,458 $1,030,384 $1,127,450 $1,245,679 $1,073,919.00
Disposal
Depreciation $1,127,580 $1,134,300 $1,124,939 $931,929 $1,356,405 $1,135,030.60
Total $3,518,249 $4,439,755 $4,401,735 $4,752,775 $5,935,009 $4,609,504.60
Financial Audit
The Sanitary District No. 2 of Marin County annually has its financial statements audited and
contracts with an outside certified public accounting firm, The Pun Group. The most recent
audited financial statement was prepared for the fiscal year ending June 30, 2023.
Marin LAFCo 67 Central Marin Wastewater Study
Final February 2025
11.0 SAN QUENTIN VILLAGE SEWER MAINTENANCE DISTRICT
11.1 OVERVIEW
The San Quentin Village Sewer Maintenance District (SQVSMD) was formed in 1962 as a
dependent special district under Section 4860 of the California State Health and Safety Code.
The District is organized as a limited-purpose agency municipal operation statutorily limited to
providing wastewater collection to the community of San Quentin Village, a small
unincorporated area that is directly adjacent to the San Quentin Rehabilitation Center. The
District’s jurisdictional boundary encompasses .012 square miles. The last municipal service
review that included the San Quentin Village Sewer Maintenance District was conducted in
2017.
Table 11- 1: San Quentin Village Sewer Maintenance District Overview
San Quentin Village Sewer Maintenance District
Primary Contact: Christopher Blunk Phone: (415)-499-6528
Mailing Address: 3501 Civic Center Drive STE 304, San Rafael, CA
Formation Date: May 1962
Services Provided: Wastewater Collection
Service Area: 8.22 acres Population Served: 110
11.2 FORMATION AND DEVELOPMENT
The area of Point San Quentin was originally a small apportionment of the 8,877-acre Mexican
land grant known as Rancho Punta de Quentin. The land was given in 1840 by Governor Juan B
Alvarado to John Cooper, and also encompassed what is now the Towns of Ross and San
Anselmo, as well as the community of Kentfield. In 1850, Benjamin Rush Buckelew purchased
the Rancho Punta de Quentin from Cooper with the intention of creating the country’s first major
west-coast port city. When the new city failed to materialize, Buckelew moved his sawmill from
the Larkspur area to Point San Quentin used as space for making lumber for the rapidly
increasing construction in San Francisco.
In 1852, the California State Legislature appointed a committee to investigate sites for the
establishment of a state prison. The committee ultimately decided on the San Quentin site and
on July 7, 1852, Buckelew sold 20 acres to the State of California for $10,000. At the time, the
State was utilizing a large ship, the Waban, as the first state prison. In the latter part of 1852, the
Waban was anchored offshore with approximately 40 incarcerated inmates. During the day, the
workers were transported to land in order to quarry stone and make bricks to construct the first
prison cells. The construction of the prison was completed in 1854 and originally featured 48
windowless cells. Initially, the prison was under private management, with individuals awarded
contracts to run the facility. After a few years that were fraught with abuse of this arrangement,
the State of California took over in 1860.
Marin LAFCo 68 Central Marin Wastewater Study
Final February 2025
The area immediately surrounding the prison developed a few temporary structures in the late
1850s to accommodate prison staff members. It wasn’t until the 1870s that the construction of
permanent residences ultimately replaced the temporary housing. By the end of the 1940s, over
two dozen residences had been constructed into what was referred to as San Quentin Village
housing approximately 50 people. In 1962, the Marin County Board of Supervisors approved the
formation of the San Quentin Village Sewer Maintenance District as a means for landowners to
tax themselves for the purposes of constructing and operating a community wastewater
collection system. The initial collection system’s construction was completed in 1965 with the
Marin County Department of Public Works overseeing all operational and maintenance
activities. Just prior to the completion of the construction in 1964, SQVSMD entered into a
contract with the State of California to direct wastewater flows directly into the adjacent State
Prison’s collection system for access to the subsequent treatment and disposal at the facility’s
wastewater treatment plant.
In May of 2012, SQVSMD entered into an agreement with the Central Marin Sanitation Agency
to provide operation and maintenance of the SQVSMD collection system and pump station.
Figure 11- 1: San Quentin Village Sewer Maintenance District Service Area
Marin LAFCo 69 Central Marin Wastewater Study
Final February 2025
11.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE
The SQVSMD jurisdictional boundary encompasses approximately .012 square miles and covers
eight total acres. The jurisdictional boundary is entirely within the land use authority of the
County of Marin and comprises the unincorporated community of San Quentin Village. The
District is made up of 41 assessor parcels on both sides of Main Street from the eastern end of
the residential properties to approximately 260 feet to the west of the intersection of Main Street
and McKenzie Street.
The Commission has not established a sphere of influence designation for SQVSMD. It appears
this is the result of an earlier determination that SQVSMD falls outside of the Commission’s
authority. Commission staff has revisited this matter as part of this study and concludes that
SQVSMD and, more specifically, sewer maintenance districts formed under Public Health and
Safety Code Section 4860-4927 are subject to LAFCo. As such, a sphere designation should
ultimately be assigned to the District.
11.4 GROWTH AND POPULATION
SQVSMD’s resident population within its jurisdictional boundary is independently estimated by
the Commission at 110 as of the term of this study. This projection is based on a calculation of
the number of housing units multiplied by 2.45 which is the current average in Marin County for
residents per housing unit. This calculation is necessitated as the District resides within two
separate U.S. Census tracts that make up significantly larger areas. Of the 45 units, 33 are
single-family and 12 are multi-family. The 41 developable assessor parcels in the District are
fully built out, leaving no current possibility for any significant future growth within the
District’s boundary.
11.5 MUNICIPAL SERVICES
Wastewater Collection
San Quentin Village Sewer Maintenance District provides wastewater collection to all 41 of the
assessor parcels within its jurisdictional boundary. In total, the District’s sewer infrastructure is
composed of approximately 1,500 feet of gravity sewer lines and one force main, 12 manholes,
and one pump station. The pump station pushes the collected wastewater through a force main
to a gravity sewer that flows into the State-owned gravity sewer system on the site of the San
Quentin Rehabilitation Center (SQRC). The District’s wastewater flow discharges into the
SQRC collection system where it is pumped to the Central Marin Sanitation Agency for
treatment and disposal. Due to the wastewater flow from the District being directly incorporated
into the SQRC collection system, SQVSMD does not independently track wastewater flow totals
generated within its jurisdictional boundary. The District contracts with the Central Marin
Sanitation Agency for the operation and maintenance of its collection system and pump station.
The District has had no instances of any sanitary sewer overflows in the course of this study
window (past 5 years). Since no further significant development in San Quentin Village is
projected, the major sewer system planning consists of ensuring that the collection system is
properly maintained and that deteriorated lines are repaired or replaced. The District reports that
Marin LAFCo 70 Central Marin Wastewater Study
Final February 2025
there are currently a total of 37 service connections within the District. In FY 2023-24, those 37
connections created a wastewater collection flow equivalent of 45 equivalent dwelling units
(EDU). The current sewer service rate is $472 per EDU. Property owners receiving service
from SQVSMD are assessed this annual fee which is included on their property tax bill. Rate
changes are made by the Board of Supervisors. There have been no rate changes at any point
within the study window.
Staff in the past was involved in discussions between the County and RVSD about the possible
reorganization that would end with the SQVSMD being annexed into RVSD. While those
discussions have stalled it was discovered that Caltrans has a maintenance yard between
SQVSMD and I 580 on the bay side of Main Street. This maintenance yard currently connects
into the SQVSMD system to transport its wastewater to the CMSA treatment plant. It would
appear that neither SQVSMD nor Caltrans pay for treatment that is performed by CMSA but
rather the prison seems to pay for the treatment of these groups.
11.6 ORGANIZATION STRUCTURE
Board of Directors
The governance for SQVSMD is dependently provided by the County of Marin through its five-
member Board of Supervisors that are elected by supervisorial district to staggered four-year
terms. SQVSMD-related matters are considered, as needed, during regular meetings held by the
Board of Supervisors.
Table 11- 2: Marin County Board of Supervisors
Member Position Term Expiration
Dennis Rodoni President January 2, 2025
Mary Sackett Vice-President January 2, 2027
Eric Lucan 2nd Vice-President January 2, 2027
Katie Rice Supervisor January 2, 2025
Stephanie Moulton-Peters Supervisor January 2, 2027
Administration
The Marin County Board of Supervisors assigns the Director of Public Works to serve as the
SQVSMD District Engineer. Key duties of the Public Works Department performed on behalf
of SQVSMD include proposing an annual budget, recommending changes to the fee schedule,
and collaborating with CMSA to oversee capital improvements. The day-to-day operation of
SQVSMD and its collection system is managed contractually by CMSA.
Marin LAFCo 71 Central Marin Wastewater Study
Final February 2025
11.7 ACCOUNTABILITY AND TRANSPARENCY
Meeting and Agendas
The Board of Supervisors meeting agendas, minutes, and recordings can be viewed on the Marin
County website. Board documents such as resolutions and ordinances can also be found on the
Board of Supervisors page of Marin County’s website.
Annual Budget Review
The District’s budget, typically adopted no later than the June Board meeting each year in
alignment with the budget process for the County of Marin, provides overall control of revenue
and expenditures including appropriations on a line-item basis and the means of financing them.
The Public Works Director presents financial reports to the Board as necessary to ensure
budgetary compliance.
11.8 FINANCIAL OVERVIEW
Revenues for the District are generated almost entirely from the taxes assessed in each
customer’s property tax roll. For the course of the study window, total annual revenues have
averaged $49,140. Annual expenses consist primarily of minor maintenance and repairs as well
as planned infrastructure upgrades/rehabilitation and the cost of the contract with CMSA. The
average annual expenses over the course of the study window were $40,626. As of the FYE
June 30, 2023, the District maintained a fund balance of $301,656.
Marin LAFCo 72 Central Marin Wastewater Study
Final February 2025
12.0 LAS GALLINAS VALLEY SANITARY DISTRICT
12.1 OVERVIEW
The Las Gallinas Valley Sanitary District (LGVSD) was formed in 1954 as an independent
special district under Section 6400 of the California State Health and Safety Code. The District
provides wastewater collection to the City of San Rafael that is north of Puerto Suello Hill in
primarily the Terra Linda community area of the City, as well as to the unincorporated
communities of Santa Venetia, Los Ranchitos, and Marinwood stretching through the area of
Lucas Valley. LGVSD’s current service area includes the tributary areas to Miller Creek and
Gallinas Creek. The District’s jurisdictional boundary encompasses just under 9.6 square miles.
The last municipal service review that included the Las Gallinas Valley Sanitary District was
conducted in 2017.
Table 12- 1: Las Gallinas Valley Sanitary District Overview
Las Gallinas Valley Sanitary District
Primary Contact: Curtis Paxton Phone: (415)-472-1734
Mailing Address: 101 Lucas Valley Road Suite 300, San Rafael
Formation Date: April 6, 1954
Services Provided: Wastewater Collection, Recycled Water, Solid Waste Collection
Service Area: 6,058 acres Population Served: 29,120
12.2 FORMATION AND DEVELOPMENT
The Las Gallinas Valley Sanitary District’s service area’s earliest development began in 1844 in
the form of cattle ranchers who established themselves in the locale through a Mexican land
grant to one of Marin County’s first western settlers, Timothy Murphy. The grant contained
three distinct ranchos – San Pedro, Santa Margarita, and Las Gallinas – totaling approximately
21,000 acres and running from east to west from what is present-day Point San Pedro to Big
Rock Ridge in Lucas Valley. The land was maintained as cattle ranches until Murphy’s death in
the early 1850s. The land was bequeathed to Murphy’s nephew, John Lucas, who quickly began
dividing and selling lots to interested outside parties. One of the larger lot sales was to a
Portuguese settler named Manuel T. Freitas whose family established a large homestead that is
now present-day Terra Linda.
The division and sale of lots progressively led to an increase in residential and commercial
development throughout the area. On the southeastern end of the rancho, the area of what is
present-day Santa Venetia produced two significant goldmines in the hills that operated until
1884 and 1889 respectively. The area of Santa Venetia, which would later serve as LGVSD’s
initial service area, was developed on marshland that was filled in 1914. The area was originally
planned for development to be modeled after Venice, Italy, with proposals including canals and
gondolas. These development plans were ended due to the economic decline following World
War I, and the area remained largely undeveloped through the early 1900s. Following the end of
World War II, the same subdivision map that had been created for the earlier development
Marin LAFCo 73 Central Marin Wastewater Study
Final February 2025
proposal in the area was utilized to construct the Gallinas Village. Development around this area
continued throughout the 1940s and into the early 1950s, however, the infill that had been used
to create the area came under such duress that the County of Marin had to halt the approvals of
new construction permits in lieu of establishing a community wastewater system.
The formation of the Las Gallinas Valley Sanitary District came to fruition following the petition
by landowners in Santa Venetia who were faced with the inability to create new developments in
the area due to the halting of permit approvals as well as area residents who were faced with a
serious health problem from failing septic tanks and resulting pollution of Gallinas Creek. The
petition was heard and approved by the County of Marin’s Boundary Change Commission and
following a successful vote of local landowners, the Las Gallinas Valley Sanitary District was
formed on April 6, 1954. A note of interest within the formation proceedings was that a
significant premise of the formation was a desire of the local landowners to remain independent
of the neighboring City of San Rafael, and the dependent wastewater district that it had formed
just a few years earlier in 1947.
LGVSD completed the construction of its first wastewater treatment facility in 1955, and in
1958, completed a significant expansion to accommodate the continued growth throughout the
Gallinas Valley. The District annexed the area of Terra Linda in November of 196544, followed
soon after by the areas of San Rafael Meadows, Marinwood, and Lucas Valley, among others.
By 1972, a majority of the unincorporated area of Terra Linda had been developed and was
ultimately annexed that year by the City of San Rafael. LGVSD completed a second major
upgrade to its treatment facility in this same year as much of the new growth within the service
area shifted primarily to the east of U.S. Highway 101. The District completed a third major
expansion of the treatment facility in 1984. With a continually shrinking capacity due to
continued growth, in 1985 the District purchased and developed 383 acres of land for wastewater
disposal adjacent to its wastewater treatment facility. The project included a 20-acre wildlife
marsh, 40 acres of storage ponds, a 10-acre saltwater marsh, 20 acres of irrigated landscaping,
and 200 acres of irrigated pasture. As part of the reclamation project, LGVSD dedicated three
and one-half miles of public easements along the shore of the storage ponds and around the
saltwater marsh.
In 1989, LGVSD entered into an agreement with the Marin Municipal Water District (MMWD)
to provide a joint agency effort to treat the District’s secondary treated wastewater through the
tertiary phase and then distribute the treated wastewater throughout the District to make it
available for landscape irrigation and for other purposes. MMWD distributes the treated
wastewater through a dedicated distribution system (“purple pipes”) to irrigate golf courses,
landscaping at office and apartment buildings, and along freeways, streets, and parks. MMWD
has ownership and provides maintenance to all purple pipes throughout this connection. This
treated water is distributed throughout Marinwood, Terra Linda, and down to North San Pedro
Road.
44 Marin LAFCo Resolution 65-02
Marin LAFCo 74 Central Marin Wastewater Study
Final February 2025
Since 1955, LGVSD has provided solid waste (garbage/refuse/recycling) services through the
District’s franchise service provider, Marin Sanitary Service to the entire North San Rafael area,
both incorporated and unincorporated. In April 2004, the City of San Rafael acted to assume
responsibility for the collection of all refuse within the City’s boundaries including north San
Rafael in order for the entire city to pay the same rates and receive the same level of service.
Following this act, LGVSD’s provision of solid waste collection within its service area was
reserved to just the unincorporated areas outside of the City of San Rafael’s jurisdictional
boundary.
Also in 2004, the District installed an 81-kilowatt photovoltaic system to provide green power
for its reclamation area. The District followed this act in 2006 with the installation of an 850,000
kWh/year photovoltaic system to power its treatment plant facilities with green power.
In 2011, LGVSD entered into an agreement with the North Marin Water District (NMWD) to
provide fully treated recycled water supplies for distribution in the Novato area and surrounding
communities.
In 2019, the District began a major multi-year expansion to its treatment plant which would
ultimately increase the plant’s capacity to 3.2 million gallons per day. The upgrade also included
the rebuilding and expansion of the District’s recycled water production facility, which enabled
the production capacity of approximately 5 million gallons of recycled water per day. The new
recycled water facility has been online since March 2021.
Marin LAFCo 75 Central Marin Wastewater Study
Final February 2025
Figure 12- 1: Las Gallinas Valley Sanitary District Jurisdictional Boundary and Sphere of Influence
12.3 DISTRICT BOUNDARY AND SPHERE OF INFLUENCE
The Las Gallinas Valley Sanitary District’s jurisdictional boundary encompasses approximately
9.6 square miles of both incorporated and unincorporated Marin County. The District’s service
area includes three land use authorities that overlay the District’s jurisdictional boundary. The
County of Marin accounts for approximately 63% of all LGVSD lands and includes the
communities of Santa Venetia and Marinwood as well as the Los Ranchito and Lucas Valley
neighborhoods. The City of San Rafael comprises approximately 36% of the District’s service
area and generally encompasses the City’s Terra Linda area. The remaining 1% of the
jurisdictional boundary falls under the land use authority of the City of Novato and is specific to
the Marin Valley Mobile Country Club and an adjacent open space property. In total, the
District encompasses 10,443 assessor parcels, providing sewer service to 9,730 parcels.
The District’s sphere of influence was established July 14, 1983, as part of Marin LAFCo’s
initial sphere of influence studies for special districts throughout Marin County. The sphere was
established as the full jurisdictional boundary of the District as well as the non-jurisdictional
lands along Lucas Valley Drive that encompass the Miller Creek tributary, the area of the Terra
Linda-Sleepy Hollow Divide, and the unincorporated St. Vincent area. The sphere was
subsequently amended in 2006 following the San Rafael Area Municipal Service Review to
remove the area of the Terra Linda-Sleepy Hollow Divide as this area had been designated as
Marin LAFCo 76 Central Marin Wastewater Study
Final February 2025
public open space with no opportunity for future service needs. The most recent update of the
sphere of influence occurred in April of 201645 during the reorganization of one parcel from the
San Rafael Sanitation District was annexed into LGVSD.
12.4 GROWTH AND POPULATION
The Las Gallinas Valley Sanitary District provides service to two of the eleven incorporated
towns/cities in Marin County (San Rafael, Novato) as well as the two census-designated places
of Santa Venetia and Marinwood/Lucas Valley. The District also provides service to the
unincorporated Los Ranchito neighborhood. While the communities of Marinwood and Lucas
Valley may have local distinctions separating one from the other, the US Census Bureau
recognizes both of these spaces as a single census-designated place for population data. The
District’s boundaries are nearly coterminous with the inhabited spaces within six U.S. Census
tracts46. The current combined population within these tracts is estimated to be 30,56747. This
total is an increase of 4.96% from the 2010 U.S. Census population total for the area of 29,120,
which equates to an annual growth rate over this period of approximately 0.35%.
The remaining development potential within each of the planning areas within the District’s
boundary (both incorporated and unincorporated), while relatively minimal based upon the
number of remaining undeveloped parcels zoned for residential development, has experienced
recent changes with the majority of Cities/Towns as well as Marin County itself having adopted
updated housing elements that included planning for accommodations of the housing mandates
from the State. The Association of Bay Area Governments (ABAG) has designated a need for a
total of 3,569 additional housing units in unincorporated Marin County by 2031 within the
Regional Housing Needs Allocation (RHNA) plan. This number is 907 units shy of what Marin
County had deemed as the total buildout for unincorporated Marin County. Of those 3,569 units,
1,16048 have identified sites for development within the unincorporated spaces in Las Gallinas
Valley Sanitary District’s sphere of influence. Meanwhile, the additional RHNA sites that have
been identified in/by the City of San Rafael that lie within the sphere of influence of the District
would create an additional 1,8174950 units
The current projection in the hypothetical scenario that each of the identified sites for RHNA
development within LGVSD were to be developed to their maximum buildout potential, the
45 Marin LAFCo Resolution 2016-03; 91 Glenside Way Annexation
46 U.S. Census Tracts: 1081, 1082.02, 1082.01, 1060.01, 1060.02, 1070
47 Population estimates are a combination of data provided by the State of California Department of Finance as
well as the American Community Survey.
48 Marin Countywide Plan; 2023-2031 Housing Element; Pg. 210
49 San Rafael Housing Element; 2023-2031
50 This amount is inclusive of all 1,422 planned units in both of the 2 phases of the Northgate Town Square
redevelopment proposal. The initial phase consists of the construction of 907 units and, pending the still needed
approval, would be the only phase that would be completed within the current Housing Element cycle. Both the
City and the Developer have already identified that the second phase of the development proposal would require
a sewer line upsizing as part of the project.
Marin LAFCo 77 Central Marin Wastewater Study
Final February 2025
additional dry weather flow would be approximately 0.18 million gallons per day51 from the
unincorporated spaces and 0.20 million gallons per day from the City of San Rafael. Given its
current average dry weather flows as well as the permitted allowances for flows, LGVSD has the
capacity to accommodate this level of growth. The District’s total number of sewer customers
have been essentially stagnant over the past 10 years52, with a total residential customer sanitary
unit count of 12,629 in 2014 and 12,491 in 2023. In that same time frame, the District
maintained an average daily wastewater flow to the treatment facility of 2.52 million53 gallons.
12.5 MUNICIPAL SERVICES
Wastewater Collection/Treatment
Las Gallinas Valley Sanitary District provides wastewater collection to the vast majority of
residents and businesses within its jurisdictional boundary. The District has a total of 15,745
sewer service customers, which includes commercial customers class count based on their
Equivalent Sanitary Unit which fluctuates based on prior year water use. In total, the District’s
sewer infrastructure is composed of approximately 105 miles of mainline and trunk line and 6.72
miles of force main. The average age of the collection system dates between 40 to 50 years with
an expected lifespan of up to 80 years. The pipes throughout the District vary between vitrified
clay (VCP), high-density polyethylene (HDPE), ductile iron (DI), cast iron (CIP), and polyvinyl
chloride (PVC) among others. The area has a total of 28 pump stations throughout the District’s
boundary that lead to an advanced secondary-level treatment facility. The treatment plant
experienced a significant upgrade in 2008, followed by another upgrade that started in 2019 and
is considered the largest single capital improvement project in the District’s history. The $68
million upgrade, completed in 2023, increased the plant’s secondary treatment capacity from 8 to
18 million gallons per day and increased the District’s recycled water production capacity from
1.8 million gallons per day to 5 million gallons per day. The treatment plant is also equipped
with a 588kW solar photovoltaic system that supplies solar energy to help power the treatment
plant. The solar photovoltaic system is offline for safety reasons but the District plans to replace
the system as part of a capital project. In addition to the solar energy generation system, the
District also has constructed and utilizes a closed-loop biogas energy recovery system. This
system allows for the recovery of 100% of the methane produced from the anaerobic digestion of
wastewater sludge at the treatment facility and conditions it for onsite combined heat and power
generation. This process helps lower energy costs for the District by, on average, $53,000 over a
12-month period54, as well as furthering the District’s environmental goals by increasing the
amount of its operation that is powered by renewable energy.
The District’s sewer service rates were last adjusted in FY 2023/24 following a rate review by an
independent consultant and a full Prop 218 process. The increase from FY 2022/23 to 2023/24
was a total of 11% and raised the annual sewer service charge for a single-family home to
$1,233. This rate is scheduled to increase by 10% annually for each of the following three fiscal
51 Marin Countywide Plan; 2023-2031 Housing Element; Pg. 115
52 LGVSD ACFR 2023; Pg 60
53 LGVSD ACFR 2023; Pg 68
54 California Energy Commission Final Project Report
Marin LAFCo 78 Central Marin Wastewater Study
Final February 2025
years, through FY 2026/27. The approved rate schedule supports the District’s operations and
maintenance as well as a robust capital improvement program. The District operates on a 7-year
capital improvement program, with the current iteration spanning FY 2024/25 through FY
2030/31. As it currently stands, the total amount forecasted for projects within the capital
improvement program is $172,611,432.55
Over the course of the past five years of publicly available data (2018-2022), the District has
experienced 12 sanitary sewer overflows56 totaling approximately 35,604 gallons.
Recycled Water
Las Gallinas Valley Sanitary District has played a part in the distribution of recycled water in
Marin County since 1977, when the District leased land to the Marin Municipal Water District
(MMWD) for the construction of Marin County’s first recycled water treatment facility. This
facility would receive a significant upgrade in 1998 that expanded its capacity from producing
1.0 to 2.0 million gallons daily. On April 1, 2017, LGVSD entered into an agreement with
MMWD to decommission MMWD’s older facility and partner in the construction of a new
recycled water treatment facility. The current agreement between the two agencies grants
MMWD access to 1.87 million gallons per day of recycled water through 2047. The
decommissioning of the plant and construction of the new plant caused the non-potable recycled
water distribution to be interrupted in 2019 and 2020, however, during this time the water
demands by the recycled water system were met with potable water. The upgraded plant has a
treatment capacity of approximately 5 million gallons daily. This recycled water service is
confined to the Terra Linda, Marinwood, Smith Ranch, Santa Venetia, and Marin County Civic
Center areas. The water is distributed by way of three pump stations owned by MMWD at
Freitas Parkway, Channing Way, and Quail Hill through approximately 25 miles of MMWD’s
“purple pipe”. The treatment facility operates seven months per year on average during the dryer
seasons to coincide with the seasonal demand for recycled water. In FY 2023, LGVSD provided
recycled water for 218 MMWD service connections, for a total average of approximately 638
acre-feet annually.
In 2012, North Marin Water District (NMWD) completed the construction of a purple pipeline
approximately 2.5 miles long to distribute recycled water to the community of Novato. LGVSD
provides recycled water and NMWD distributes this recycled water for irrigation to the Hamilton
Field area of southern Novato. In FY 2022/23, the District produced 43.25 million gallons to
NMWD.
In 2023, LGVSD was named California’s “Recycled Water Agency of the Year” by the
California WateReuse Association.
55 LGVSD Adopted Budget Book FY 2024/25; Pg 30
56 LGVSD ACFR 2023; Pg 70
Marin LAFCo 79 Central Marin Wastewater Study
Final February 2025
Solid Waste
Since 1955, LGVSD has provided solid waste (garbage/refuse/recycling) services through
contract with the District’s franchise service provider, Marin Sanitary Service, to the entire North
San Rafael area within the District’s boundaries. In April 2004, the City of San Rafael Acted to
assume responsibility for the collection of all refuse within the city boundaries including north
San Rafael in order for the entire city to pay the same rates and receive the same level of service.
The City’s action was also intended to equalize franchise fees paid by private waste haulers for
the maintenance of streets throughout the City. Following this action and continuing today,
LGVSD provides solid waste removal services to the unincorporated areas within its
jurisdictional boundaries. As of January 1, 2023, residential customers pay a monthly service fee
of $43.93 for a 32-gallon cart.
12.6 ORGANIZATION STRUCTURE
Board of Directors
The Las Gallinas Valley Sanitary District receives oversight and policy direction by way of a
five-member Board of Directors that is elected to staggered four-year terms by way of at-large
elections within the service boundary. All directors are required to be registered voters residing
within the District’s jurisdictional boundary. Based on data provided by the County Department
of Elections which span from 1972 to 2022, Las Gallinas Valley Sanitary District had 19 election
cycles during that timeframe in which a formal election process was necessitated, 9 seats were
appointed in lieu of an election, and the District’s Board necessitated zero appointments to seats
on the Board by the Marin County Board of Supervisors.
Table 12- 2: Las Gallinas Valley Sanitary District Board of Directors
Member Position Term Expiration
Craig Murray Director December 2028
Gary Robards President December 2028
Crystal Yezman Vice-President December 2026
Megan Clark Director December 2026
Nicholas Lavrov Director December 2026
Administration
The Board of Directors of Las Gallinas Valley Sanitary District appoints the District’s General
Manager who leads and manages the District’s day-to-day operations. The General Manager for
Las Gallinas Valley Sanitary District is full-time and manages the other 31 FTE employees
employed by the District.
Marin LAFCo 80 Central Marin Wastewater Study
Final February 2025
12.7 ACCOUNTABILITY AND TRANSPARENCY
The Las Gallinas Valley Sanitary District maintains a high level of accountability and
transparency in all its activities. The District website provides documentation on board meeting
agendas and minutes as well as financial reports, services, studies, sewer system management
plan, permitting, contracts, and more.
Meeting and Agendas
The Las Gallinas Valley Sanitary District Board of Directors meets regularly on the 1st and 3rd
Thursday of each month at 4:00 p.m. in the District Administrative Office at 101 Lucas Valley
Road, Suite 300 in San Rafael. Special meetings are held as needed to go over specific topics.
Meeting agendas and minutes can be found on the District’s website, lgvsd.org.
Annual Budget Review
The District’s budget, typically adopted no later than the June Board meeting each year, provides
overall control of revenue and expenditures including appropriations on a line-item basis and the
means of financing them. The annual budget proposal is prepared by the General Manager and
Administrative Services Manager. The Administrative Services Manager presents financial
reports to the Board every quarter to ensure budgetary compliance.
12.8 FINANCIAL OVERVIEW
Over the course of the study window (past 5 fiscal years of available audited financials), Las
Gallinas Valley Sanitary District has maintained increases in total net position each year, with a
total increase in net position during that time of just over 30%, indicating a consistent addition
by the District to its asset base and concerted effort at a reduction in liabilities. Simultaneously,
the District has seen a fluctuation in unrestricted net position that has ultimately resulted in a
total increase over the 5 years of approximately 9%. The District’s total annual operating
revenues57 have outpaced operating expenditures in each of the five fiscal years by an annual
average of 13.8%. These excess funds are primarily allocated toward the District’s capital
improvement projects and maintaining the District’s target reserves. The average annual
operating revenues for the District over the 5-year period were $15,590,930, with a total increase
of just over 21% in that span. Overall, LGVSD demonstrates strong financial health over the
study window. The consistent growth in net position, steady increase in revenues outpacing
expenses, decreasing debt ratio, and significant investment in capital assets all point to a well-
managed and financially sound organization. The District appears to be balancing the need for
infrastructure investment with maintaining financial stability and flexibility.
The primary revenue sources for the District are sewer use charges (89%) and property taxes
(8%) with franchise fees, recycled water fees, and interest income supplementing the majority of
the remaining 3% annually. The primary annual operating expenses for Las Gallinas Valley
57 As the District views its operating purpose is to provide wastewater collection and treatment services that are
funded by sewer service charges, property tax and franchise fees are classified as nonoperating within the
District’s accounting policies.
Marin LAFCo 81 Central Marin Wastewater Study
Final February 2025
Sanitary District are sewage treatment (27%), sewage collection and pump stations (20%), and
general and administrative (17%), and depreciation58 (25%). A breakdown of the past 5 years of
operational revenues and expenses can be seen below in Table 12-3.
Table 12- 3: Las Gallinas Valley Sanitary District Financial Information
Operating FY 2018-19 FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 Averages
Revenue
Sewer Use $14,228,877 14,831,995 $15,284,365 $15,491,846 $16,999,751 $15,3367,367.00
Charges
Recycled $63,463 $67,288 $123,155 $27,345 $127,742 $81,798.60
Water Fees
Other $42,905 $65,401 $614,272 $6,175 $67,675 $159,286.40
Total $14,335,245.00 $14,964,684.00 $16,021,792.00 $15,525,366.00 $17,195,168.00 $15,608,451.00
Operating FY 2018-19 FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 Average
Expenses
Sewage $1,162,234 $1,272,839 $1,570,736 $1,941,906 $2,741,055 $1,737,754.00
Collection and
Pump Stations
Sewage $1,934,173 $4,269,850 $2,865,940 $3,211,152 $3,671,060 $3,190,435.00
Treatment
Sewage and $197,680 $616,172 $506,939 $435,226 $712,974 $493,798.20
Solid Waste
Disposal
Laboratory $318,732 $359,635 $498,183 $506,403 $534,204 $443,431.40
Engineering $469,826 $616,435 $874,206 $982,986 $937,443 $776,179.20
Recycled $181,058 $115,532 $106,416 $62,460 $102,306 $113,554.40
Water
General and $1,773,711 $2,890,950 $2,582,892 $2,898,595 $2,290,957 $2,487,421.00
Administrative
Depreciation $2,654,616 $2,896,926 $3,044,656 $3,127,040 $3,619,251 $3,068,497.80
Totals $8,692,030.00 $13,038,339.00 $12,049,968.00 $13,165,768.00 $14,609,250.00 $12,311,071.00
Debt
As of June 30, 2023, LGVSD carried a total long-term debt amount of $51,766,054 with a debt
ratio of 0.36. Below is a description of the borrowings comprising that amount as of June 30,
2023:
58 Depreciation is shown as an operating expense in the financial statements in step with generally accepted
governmental accounting standards, and as such impacts - and often negatively - gross profit or total margin.
Depreciation takes into account the wear and tear on physical infrastructure, such as sewer lines, pumps, and
other capital equipment. Government accounting standards direct agencies to spread out the costs of replacing
these assets over the long term, which generates the term depreciation or amortization. The “charge” for using
these assets during the period is a fraction of the original cost of the assets based on the expected life of the assets
and presumably is rolled into the agencies’ fund balance at the end of the fiscal year and as part of the restricted
reserve.
Marin LAFCo 82 Central Marin Wastewater Study
Final February 2025
• Loan Payable 2011 – $2,279,755
• State Revolving Fund Loan 2012 - $2,254,080
• Loan Payable 2019 – $10,623,025
• Revenue Bonds 2005 – $2,068,800
• Revenue Bonds 2017 – $32,265,000
The District also provides a pension plan for employees and is part of the California Public
Employees Retirement System (CalPERS). CalPERS provides retirement, disability, and death
benefits based on the employee’s years of service, age, and final compensation. As of June 30,
2023, the District’s Unfunded Actuarial Liability was $5,412,284. As of the most recent
CalPERS actuarial Valuation on June 30, 2023, the District’s pension-funded ratio was 71.8% In
addition to the pension plan, the District provides other post-employment benefits (OPEB) to its
retirees. As of June 30, 2023, the District carried a net OPEB liability of $899,028.
Financial Audit
The Las Gallinas Valley Sanitary District annually has its financial statements audited and
contracts with an outside certified public accounting firm, Nigro &Nigro. The most recent
audited financial statement was prepared for the fiscal year ending June 30, 2023.
Marin LAFCo 83 Central Marin Wastewater Study
Final February 2025