Municipal Service Review and
Sphere of Influence Update
Prepared for:
M LAFC
ENDOCINO O
200 South School Street
Ukiah, California 95482
http://www.mendolafco.org/
Workshop: August 7, 2017
Public Hearing: November 6, 2017
Continued Public Hearing: December 4, 2017
Adopted: December 4, 2017
LAFCo Resolution No. 2017-18-05
[This page intentionally left blank]
MSR/SOI Update | City of Fort Bragg
TABLE OF CONTENTS
1 INTRODUCTION .......................................................................................................................................... 1-2
1.1 LOCAL AGENCY FORMATION COMMISSION ............................................................................................. 1-2
1.2 MENDOCINO LAFCO ................................................................................................................................. 1-2
1.3 MUNICIPAL SERVICE REVIEW ................................................................................................................... 1-2
1.4 SPHERE OF INFLUENCE ............................................................................................................................. 1-3
1.5 SENATE BILL 215 ....................................................................................................................................... 1-3
2 OVERVIEW .................................................................................................................................................. 2-1
2.1 AGENCY PROFILE ...................................................................................................................................... 2-1
2.2 FORMATION, BOUNDARY, AND SERVICES ................................................................................................ 2-1
2.3 GOVERNMENT STRUCTURE ...................................................................................................................... 2-1
2.4 MANAGEMENT AND STAFFING ................................................................................................................ 2-3
2.5 FINANCING ............................................................................................................................................... 2-5
2.6 GROWTH AND POPULATION PROJECTIONS ........................................................................................... 2-17
2.7 DISADVANTAGED UNINCORPORATED COMMUNITIES .......................................................................... 2-19
3 MUNICIPAL SERVICE REVIEW ...................................................................................................................... 3-1
3.1 SERVICE OVERVIEW .................................................................................................................................. 3-1
3.2 GENERAL GOVERNMENT .......................................................................................................................... 3-3
3.3 FINANCE ................................................................................................................................................... 3-3
3.4 COMMUNITY DEVELOPMENT................................................................................................................... 3-4
3.5 LAW ENFORCEMENT ................................................................................................................................ 3-4
3.6 PUBLIC WORKS ......................................................................................................................................... 3-6
3.7 WATER ENTERPRISE ............................................................................................................................... 3-10
3.8 WASTEWATER ENTERPRISE .................................................................................................................... 3-12
3.9 SERVICES PROVIDED BY CONTRACT OR JPA ............................................................................................ 3-16
3.10 MSR DETERMINATIONS .......................................................................................................................... 3-17
4 SPHERE OF INFLUENCE UPDATE .................................................................................................................. 4-1
4.1 BACKGROUND .......................................................................................................................................... 4-1
4.2 SPHERE OF INFLUENCE, OUT-OF-AREA SERVICES, AND AREAS OF INTEREST............................................ 4-1
4.3 SOI DETERMINATIONS .............................................................................................................................. 4-2
5 REFERENCES ............................................................................................................................................... 5-1
6 ACKNOWLEDGEMENTS ............................................................................................................................... 6-1
6.1 ASSISTANCE AND SUPPORT ...................................................................................................................... 6-1
MSR/SOI Update | City of Fort Bragg
1 INTRODUCTION
1.1 LOCAL AGENCY FORMATION COMMISSION
Local Agency Formation Commissions (LAFCos) are quasi-legislative, independent local agencies that
were established by State legislation in 1963 to oversee the logical and orderly formation and
development of local government agencies including cities and special districts. There is one LAFCo for
each county in California.
LAFCo is responsible for implementing the Cortese-Knox-Hertzberg (CKH) Local Government
Reorganization Act of 2000 (California Government Code Section 56000 et. seq.) in order to promote
orderly growth, prevent urban sprawl, preserve agricultural and open space lands, and oversee efficient
provision of municipal services.
LAFCo has the authority to establish and reorganize cities and special districts, change their boundaries
and authorized services, allow the extension of public services, perform municipal service reviews, and
establish spheres of influence. Some of LAFCo’s duties include regulating boundary changes through
annexations or detachments and forming, consolidating, or dissolving local agencies.
1.2 MENDOCINO LAFCO
The CKH Act provides for flexibility in addressing State regulations to allow for adaptation to local needs.
Mendocino LAFCo has adopted policies, procedures and principles that guide its operations. These
policies and procedures can be found on Mendocino LAFCo’s website at the following location:
http://www.mendolafco.org/policies.html.
Mendocino LAFCo has a public Commission with seven regular Commissioners and four alternate
Commissioners. The Commission is composed of two members of the Mendocino County Board of
Supervisors, two City Council members, two Special District Representatives, and one Public Member-
At-Large. The Commission also includes one alternate member for each represented category.
1.3 MUNICIPAL SERVICE REVIEW
The CKH Act (GC §56430) requires LAFCo to prepare a Municipal Service Review (MSR) for all local
agencies within its jurisdiction. MSRs are required prior to and in conjunction with the update of a
Sphere of Influence (SOI).
An MSR is a comprehensive analysis of the services provided by a local government agency to evaluate
the capabilities of that agency to meet the public service needs of their current and future service area.
An MSR must address the following seven factors:
1. Growth and population projections for the affected area
2. The location and characteristics of any disadvantaged unincorporated communities within or
contiguous to the sphere of influence
3. Present and planned capacity of public facilities and adequacy of public services including
infrastructure needs or deficiencies
4. Financial ability of agency to provide services
Chapter 1 – Introduction Page 1-2
MSR/SOI Update | City of Fort Bragg
5. Status of, and opportunities for, shared facilities
6. Accountability for community service needs, including government structure and operational
efficiencies
7. Any other matter related to effective or efficient service delivery, as required by commission
policy
MSRs include written statements or determinations with respect to each of the seven mandated areas
of evaluation outlined above. These determinations provide the basis for LAFCo to consider the
appropriateness of a service provider’s existing and future service area boundary.
1.4 SPHERE OF INFLUENCE
The CKH Act requires LAFCo to adopt a Sphere of Influence (SOI) for all local agencies within its
jurisdiction. A Sphere of Influence (SOI) is “a plan for the probable physical boundary and service area of
a local agency or municipality as determined by the Commission” (GC §56076).
When reviewing an SOI for a municipal service provider, LAFCo will consider the following five factors:
1. The present and planned land uses in the area, including agricultural and open space lands
2. The present and probable need for public facilities and services in the area
3. The present capacity of public facilities and adequacy of public services that the agency provides
or is authorized to provide
4. The existence of any social or economic communities of interest in the area if LAFCo determines
that they are relevant to the agency
5. The present and probable need for sewer, water, and/or fire protection public facilities and
services of any disadvantaged unincorporated communities within the existing sphere of
influence
SOI Updates include written statements or determinations with respect to each of the five mandated
areas of evaluation outlined above. These determinations provide the basis for LAFCo to consider the
appropriateness of establishing or modifying a service provider’s sphere of influence or probable future
boundary.
1.5 SENATE BILL 215
Senate Bill (SB) 375 (Sustainable Communities and Climate Protection Act) requires each metropolitan
planning organization (MPO) to address regional greenhouse gas (GHG) emission reduction targets for
passenger vehicles in their Regional Transportation Plan (RTP) by integrating planning for transportation,
land-use, and housing in a sustainable communities strategy. Senate Bill (SB) 215 (Wiggins) requires
LAFCo to consider regional transportation plans and sustainable community strategies developed
pursuant to SB 375 before making boundary decisions.
Mendocino County is not located within an MPO boundary and therefore is not subject to the provisions
of SB 375. However, the Mendocino Council of Governments (MCOG) supports and coordinates the local
planning efforts of Mendocino County and the Cities of Fort Bragg, Point Arena, Ukiah, and Willits to
address regional housing and transportation needs and helps provide a framework for sustainable
regional growth patterns through the Vision Mendocino 2030 Blueprint Plan. MCOG is also responsible
Chapter 1 – Introduction Page 1-3
MSR/SOI Update | City of Fort Bragg
for allocating regional transportation funding to transportation improvement projects consistent with
the 2010 RTP for Mendocino County.
Mendocino County and the Cities of Fort Bragg, Point Arena, Ukiah, and Willits are the local agencies
primarily responsible for planning regional growth patterns through adoption and implementation of a
General Plan and Zoning Regulations.
Mendocino County is not located within an MPO and there is no proposal to expand the boundary or
Sphere of Influence for the City of Fort Bragg or the Fort Bragg Municipal Improvement District No. 1.
Therefore, there will be no further discussion of the requirements of SB 375 or SB 215 in this MSR.
Chapter 1 – Introduction Page 1-4
SIMPSON LANE
MONSEN
WY
HUCKLEBERRY
LN.
HAPPY LANE
B
H
1 E D
N A
S R
LA
N
E
AIRPORT ROAD
D
OA
B
EA C H D R.
N
U E BAL D
HILL
R
GL AS S M A A V E U
TAL
E P
PUDDING CREEK ROAD
T.
S
N
A
N
KLI
ST.
EAST FIR ST.
N O R
T H F R
N O R
T H H A R
RI S O N
EAST CEDAR ST.
DEISON LN.
FORT BRAGG
SHERWOOD ROAD
EAST OAK ST.
WALL
S T.
D A
N A
S T.
LYT A
W
AY
CHESTNUT ST.
CYPRESS ST.
D
A
O
BASIN
ST.
O
N
R
S
N
W Y. H A
F
CLIF
D
RI V
E
THOMAS LANE
S
PA CI FI C D
R.
S O UT H H A R B O R D R. C O C K L N. D O R F FI R N O Y O A C R
E
B O E
B A A D A N
O N
L
N.
SHOREVIEW LN. S A N D Y L A N E T RILLI U M L A N E PI N E L N. S E A R S L N. SH 20 B E N S D W Y E R L N. OL S E N L N. S U M M E R S L GRAVEL PIT RD.
ELLISON WAY
1
H
S ALICE DRIVE
BOICE LANE
PACIFIC WAY
E
V
RI
D
O C E A N E L A N E
C
OI
B
PEARL DRIVE
SIMPSON LANE
E
V
O C E A N D R .
H
ELL C R E E K D RI
A
N
KLI N R O A D
T C F R
MI
BOATYARD
DR.
D
RIVERS END RD.
Y
M A N R O A
H N H n O a J
e
c
O
c
f i SPRUCE ST.
i
c
a T.
P
T
S
S E
W
ST.
D OL R A H
H T R O
N
MAPLE ST.
T. S
N KLI
N
A R
F
H
UT
O
S
SOUTH
ST.
OCEAN VIEW DR.
City of Fort Bragg and the City of Fort Bragg Highways
Fort Bragg SOI Roads
Municipal Improvement District Municipal Improvement District Rail Road
Municipal Improvement Dist SOI Parcels
Source: This map was prepared by the Mendocino County
°
Department of Information Services GIS Program, August 2017. 0.25 0.125 0 0.25
Note: This map is not a survey product. Miles
MSR/SOI Update | City of Fort Bragg
2 OVERVIEW
2.1 AGENCY PROFILE
Table 2.1 City of Fort Bragg Profile
Agency Name: City of Fort Bragg
Phone Number: (707) 961-2823
Mailing Address (City Hall): 416 North Franklin Street, Fort Bragg, CA 95437
Town Hall: 363 N. Main Street, Fort Bragg, CA 95437
Website: https://city.fortbragg.com/
Date of Formation: August 5, 1889
Enabling Legislation: General Law City: Government Code Section 34000 et seq.
Dependent Special District(s): Fort Bragg Municipal Improvement District No. 1
City Council Meetings: 2nd and 4th Mondays at 6 p.m. at Town Hall
2.2 FORMATION, BOUNDARY, AND SERVICES
The City of Fort Bragg incorporated on August 5, 1889 and operates as a General Law City. The City is
located approximately 35 miles west of the City of Willits and US Highway 101 on the Pacific coast of
Mendocino County along State Highway 1. The City is approximately 2.92 square miles in size and
includes five island areas (non-contiguous land) totaling 0.15 square miles in size and comprised of city-
owned property that was annexed on April 7, 1997 by LAFCo Resolution No. L97-03.
The City provides a wide range of municipal services including general government, finance, community
development, law enforcement, public works, parks, water, and wastewater. For more information
regarding these services and other services provided by contract or Joint Powers Authority (JPA), refer
to Chapter 3 of this report.
The Fort Bragg Municipal Improvement District (MID) No. 1 was established as a dependent special
district to provide wastewater services to the Fort Bragg community under the auspices of the Municipal
Sewer and Water Facilities Law of 1911. The Fort Bragg City Council established the MID on April 28,
1969 by Resolution No. 369. As a subsidiary of the City, the legislative body of MID No. 1 is the Fort
Bragg City Council. MID No. 1 is approximately 2.98 square miles in size and the District boundary
generally follows the City limits, excluding the island areas. The District serves an area slightly larger
than the City boundaries, encompassing unincorporated areas of Mendocino County to the south of the
City including Noyo Harbor and coastline, and to the southeast of the City north of Dolphin Cove. Refer
to Figure 1-1 for a map showing the boundaries of the City of Fort Bragg and MID No. 1 and their
respective Spheres of Influence. (LAFCo, 2008)
2.3 GOVERNMENT STRUCTURE
The City operates under the Council‐Manager form of government. The five members of the Fort Bragg
City Council are elected by the voters to serve overlapping four‐year terms (Table 2.2). City Council
members are paid a stipend for meetings attended in the amount of $300/month. The Mayor is elected
Chapter 2 – Overview Page 2-1
MSR/SOI Update | City of Fort Bragg
by the members of the City Council following the seating of new Council-members in even-numbered
election years, and serves a two-year term. The City Council is the policy‐setting body that is responsible
for enacting ordinances, establishing policy, adopting and amending the budget, adopting resolutions,
and appointing committees. The City Council also serves as the governing board for the Successor
Agency to the Fort Bragg Redevelopment Agency and Fort Bragg Municipal Improvement District No. 1.
The City Council appoints the City Manager to support their efforts and oversee the daily operations of
the City to ensure that the Council’s policies, programs, and priorities are implemented. Several boards,
commissions, and committees assist in carrying out various functions of city government.
Table 2.2 City of Fort Bragg City Council
Council Member Title Term Expiration
Lindy Peters Mayor December 2018
Will Lee Vice-Mayor December 2020
Bernie Norvell Councilmember December 2020
Dave Turner Councilmember December 2018
Michael Cimolino Councilmember December 2018
Regularly scheduled City Council meetings are held on the second and fourth Mondays of every month
starting at 6:00 p.m. at Town Hall located at 363 N. Main Street in Fort Bragg. Regularly scheduled
Planning Commission meetings are held on the second and fourth Wednesdays of every month starting
at 6:00 p.m. at Town Hall. There are four standing committees that meet once a month at Town Hall on
the following regular schedule: the Community Development Committee meets at 3:00 p.m. on the
fourth Tuesday, the Finance and Administration Committee meets at 1:00 p.m. on the first Wednesday,
the Public Safety Committee meets at 10:00 a.m. on the third Wednesday, and the Public Works and
Facilities Committee meets at 3:00 p.m. on the second Wednesday.
All meetings are open to the public in accordance with the Brown Act and are publicly posted a
minimum of 72 hours prior to the meeting in the notice case and lobby at City Hall located at 416 N.
Franklin Street, on the City’s website, and provided to all interested media outlets via fax.
In addition to posting public meeting notices as outlined above, Public Workshop Flyers are also posted
at public kiosks located at Main Street and Laurel Street, Franklin Street and Laurel Street, and Franklin
Street and Alder, at the Public Library located at 499 E. Laurel Street, at the Post Office located at 203 N.
Franklin Street, and on public counters and front doors at City Hall. Workshops are also advertised
through press releases and local media including the radio and newspaper.
The City offers multiple ways to keep citizens informed about workshops, hearings, projects, and overall
governance of the community. The following table provides a list of the various public involvement
opportunities available to citizens.
Chapter 2 – Overview Page 2-2
MSR/SOI Update | City of Fort Bragg
Table 2.3 City of Fort Bragg Public Involvement Opportunities
Method Link
City Website http://city.fortbragg.com/
City Meetings Archives https://cityfortbragg.legistar.com/Calendar.aspx
City Meetings Live Stream http://city.fortbragg.com/501/Council-Meeting-Live-Stream
Public Hearing Notices http://city.fortbragg.com/417/Public-Hearing-Notices
City Dialogue Meetings http://city.fortbragg.com/290/City-Dialogue
Public Notification Portal http://city.fortbragg.com/list.aspx
Online Request Tracker http://city.fortbragg.com/requesttracker.aspx
City Manager's Biweekly Reports https://city.fortbragg.com/167/City-Notes
Facebook https://www.facebook.com/CityFortBraggCA/
Instagram https://www.instagram.com/cityfortbragg/
Twitter @CityFortBraggCA
YouTube Channel https://www.youtube.com/channel/UCHVi8EInW9Davk_zr7CDx7g
Source: Fort Bragg, March 2017
The public can submit written comments and complaints online using the Request Tracker or by
completing a customer satisfaction survey and submitting it in the anonymous Customer Service
Questionnaire box at City Hall or electronically by email. The public may also provide verbal comments
or complaints by phone or in person at City Hall during business hours and/or at City Council meetings
during the general public comment period.
2.4 MANAGEMENT AND STAFFING
The City Manager is responsible for directing and supervising the administration of all departments of
the City to ensure that laws, ordinances, orders, resolutions, contracts, leases, and franchises are
enforced and executed, and for hiring all City employees. The City’s five municipal departments include
Administration, Finance, Community Development, Police, and Public Works (Figure 2-2). The City has
58 full-time employees, two part time employees, and four seasonal workers (Fort Bragg, July 2017).
More detailed information related to staffing is provided in Chapter 3 of this document under the
Staffing section for the specific City department.
Chapter 2 – Overview Page 2-3
MSR/SOI Update | City of Fort Bragg
Figure 2-2 City of Fort Bragg Organizational Chart
RESIDENTS OF CITY OF FORT BRAGG
C ity Council Committees
CITY COUNCIL
Planning Commission
ADMINISTRATION
City Manager
City Attorney
Administrative Services
City Clerk
Human Resources
Information Technology
COMMUNITY
PUBLIC WORKS
FINANCE DEVELOPMENT POLICE
Public Works
Planning & Building Water
Special Projects Wastewater
Grants
Marketing &
Promotions
Source: Fort Bragg, July 2017
Chapter 2 – Overview Page 2-4
MSR/SOI Update | City of Fort Bragg
2.4.1 OPPORTUNITIES FOR COLLABORATION OR SHARED FACILITIES
The primary public service issue facing remote coastal communities is typically the provision of
adequate public services rather than issues of overlapping or duplicative services provided by another
public agency. Due to the isolated location of Fort Bragg, the services and facilities provided by the City
and District are critical to residents of the area. The City collaborates with other public agencies to
provide service more efficiently or effectively. Some of Fort Bragg’s collaborative activities include the
following:
o The City passed a sales tax increase to finance the CV Starr Center and took over ownership of
the facility, while it continues to be managed by the Mendocino Coast Park and Recreation
District.
o The City has partnered with California State Parks for the operation of Glass Beach Headlands
and Noyo Headlands Park. The City obtained grant funding and constructed a joint parking lot
and restroom facility that serves both park units. State Parks provided a permanent easement
for a portion of the new facility.
o The City has a long-term relationship and agreement with the County of Mendocino for building
permit processing and inspection services. The Mendocino County Building Department
conducts all plan check reviews, on-site building inspections, and building permit processing for
all properties located within the City of Fort Bragg.
o The City has a long-term relationship with the County of Mendocino for the operation of the
Caspar landfill, which provides self-haul solid waste transfer services for the Coast. The City and
County have been working together for years to complete a new Solid Waste Transfer Station,
which will further reduce solid waste management costs for both entities.
o The City has a long-term relationship with the Fort Bragg Rural Fire Protection District. The City
provides $400,000 in general fund revenues on an annual basis to the fire district for fire
protection services within the City of Fort Bragg. The funds provided by the City go toward the
cost of three full-time positions with benefits and volunteer fire protection services provided at
a reduced cost. The Fire District covers a large geographic area from Caspar to Westport.
o The City of Ukiah Police Department provides dispatch services to the City of Fort Bragg Police
Department.
There were no additional opportunities for the City to collaborate with other public service providers to
achieve management or operational efficiencies identified during the preparation of this MSR.
2.5 FINANCING
2.5.1 ANNUAL BUDGET
The City prepares an annual budget that serves as the financial planning and budget control system. The
annual budget provides a comprehensive statement of the City’s organization, operations, and
resources, and it expresses City Council policies and priorities. The budget process is the vehicle through
which the City establishes goals and objectives and prioritizes desired programs and services. In
addition, the budget presents a summary of prior year accomplishments. The budget is prepared by
fund, function, and department. It is the means through which policy decisions are made, effected,
controlled and monitored. The City Manager is responsible for submitting and recommending an
operating budget and a capital improvements budget for City Council consideration and adoption.
Chapter 2 – Overview Page 2-5
MSR/SOI Update | City of Fort Bragg
Throughout the year, the budget serves as a financial management tool and an operational plan for the
delivery of City services and the implementation of funded capital projects.
In addition to the budget planning process, the City maintains budgetary controls. The City’s objective in
maintaining budgetary control is to ensure compliance with legal provisions embodied in the annual
appropriated budget approved by the City Council. The City Manager is authorized to transfer budgeted
amounts within funds as deemed necessary in order to meet the City’s needs and subject to adopted
fiscal policies. The City Council amends the budget as needed by resolution during the fiscal year.
Additionally, the City completes a mid-year budget review to ensure that the City is on target with
departmental and fund budget amounts and to verify the necessity of any budget amendments.
The City maintains an encumbrance accounting system as one technique of accomplishing budgetary
control. Purchase orders, contracts, and other commitments for expenditure of money are secured in
order to reserve that portion of the applicable appropriation. Total expenditures of each fund may not
exceed fund appropriations and total expenditures for each department may not exceed departmental
appropriations. Outstanding encumbrances at year‐end are reported as committed fund balance.
Unencumbered amounts lapse at year‐end and may be appropriated as part of the following year’s
budget. (Fort Bragg, January 2017)
2.5.2 FINANCIAL AUDIT REPORT
The City prepares an annual audit that serves as financial assurance for the use of public funds. Financial
statements are prepared upon completion of each fiscal year (July 1 through June 30) which forms the
basis of the Comprehensive Annual Financial Report (CAFR). The financial statements are audited by
JJACPA, Inc., an accounting firm fully licensed and qualified to perform financial audits and prepare an
Independent Auditor’s Report.
In the financial statements, all of the City’s activities are grouped into Governmental Activities and
Business-type activities. Governmental activities are services supported by general City revenues such as
taxes and by specific program revenues such as developer fees. All of the City’s basic services are
considered to be governmental activities, including general government, finance, community
development, law enforcement, and public works. Unlike governmental services, Business-type activities
are services supported by charges paid by users based on the amount of the service they utilize (rate-
based service charges). The City’s enterprise activities include Water and Wastewater. Additionally, the
City is considering developing a drainage enterprise fund.
The Government Finance Officers Association of the United States and Canada (GFOA) awarded the City
a Distinguished Budget Presentation Award in June of 2016 and a Certificate of Achievement for
Excellence in Financial Reporting for its comprehensive annual financial report for the fiscal year ended
June 30, 2015, marking the fifth year in a row that the City of Fort Bragg had received this recognition. In
order to be awarded a Certificate of Achievement, a government agency must publish an easily readable
and efficiently organized comprehensive annual financial report that satisfies generally accepted
accounting principles and applicable legal requirements. (Fort Bragg, January 2017)
2.5.3 GENERAL FUND
The City has three major operating funds: the General Fund, Water Enterprise, and Wastewater
Enterprise. In addition, the City’s chart of accounts includes the C.V. Starr Center Enterprise, special
revenue, grant and capital project funds, and internal service funds. The following table summarizes the
Chapter 2 – Overview Page 2-6
MSR/SOI Update | City of Fort Bragg
revenues, expenses, and changes in fund balance for the City’s General Fund based on audited financial
statements for Fiscal Years (FY) 2013-14, 2014-15, and 2015-16.
Table 2.4 City of Fort Bragg Financial Summary (General Fund)
FY 2013-14 FY 2014-15 FY 2015-16
Beginning Fund Balance $ 4,254,434 $ 4,619,710 $ 4,757,789
Prior Period Adjustments $ 33,417 $ - $ -
Ending Fund Balance $ 4,619,710 $ 4,757,789 $ 5,388,494
Revenues
Taxes and Assessments $ 4,705,187 $ 4,902,171 $ 5,012,651
Licenses and Permits $ 233,793 $ 253,970 $ 272,924
Fines and forfeitures $ 27,871 $ 17,201 $ 18,140
Intergovernmental $ 76,752 $ - $ 33,466
Use of money and property $ 16,284 $ 33,101 $ 44,011
Charges for services $ 2,872,945 $ 417,374 $ 206,855
Reimbursements $ - $ 2,929,978 $ 3,413,306
Other revenues $ 178,035 $ 59,068 $ 112,311
Total Revenues $ 8,110,867 $ 8,612,863 $ 9,113,664
Expenses
General Government $ 1,549,164 $ 2,875,646 $ 2,655,894
Public Safety $ 3,584,448 $ 3,521,118 $ 3,670,183
Public Works $ 1,509,993 $ 1,448,279 $ 1,596,338
Community Development $ 1,437,841 $ 369,180 $ 405,360
Capital Outlay $ 76,836 $ - $ -
Debt Service Principal $ 111,821 $ 116,542 $ 121,418
Debt Service Interest & Charges $ 35,748 $ 31,027 $ 26,152
Total Expenses $ 8,305,851 $ 8,361,792 $ 8,475,345
Other Financing Sources (Uses)
Proceeds from Sales of Assets $ - $ - $ 40
Transfers In $ 739,130 $ - $ 73,276
Transfers Out $ (212,287) $ (112,992) $ (80,930)
Total Other Financing $ 526,843 $ (112,992) $ (7,614)
Net Income/(Loss) $ 331,859 $ 138,079 $ 630,705
Source: (Fort Bragg, January: 2015, 2016, & 2017)
The core operations of the City are accounted for in the General Fund and the General Fund balance is a
key measure of the fiscal health of the City. For FY 2013-14, the General Fund ending balance increased
by $331,859 (7.8%) from the beginning balance. For FY 2014-15, the General Fund ending balance
increased by $138,079 (2.99%) from the beginning balance. For FY 2015-16, the General Fund ending
balance increased by $630,705 (13.25%) from the beginning balance. For the years audited, the annual
growth in the General Fund balance indicates that the City does not need to utilize reserve funds to
balance the General Fund budget.
Chapter 2 – Overview Page 2-7
MSR/SOI Update | City of Fort Bragg
Comparing revenues to expenses is another way to measure the annual fiscal health of City operations.
In FY 2013-14, expenses exceeded revenues by $194,984. Revenues exceeded expenses by $251,071 in
FY 2014-15. In FY 2015-16, revenues again exceeded expenses by $638,319. For the years audited, the
City’s annual revenue sufficiently covers annual expenses indicating that under current levels of public
service, the General Fund is fiscally healthy.
2.5.3.1 Cost Allocation Plan Correction
During the FY 2016-17 budget process, staff discovered an accounting error in the City’s Cost Allocation
Plan that occurred between Fiscal Years 2010-11 and 2015-16 and which resulted in a disproportionate
share of non-personnel overhead costs being allocated to the Water and Wastewater Enterprise Funds.
The part of the City’s Cost Allocation Plan related to non-personnel overhead costs is based on a
schedule of the total non-salary General Fund costs to be allocated for a particular fiscal year and the
percentage of the total cost to be paid from each participating fund. There were two errors in the
methodology used for the prior cost allocation plan. First, the total cost was based on budgeted
amounts instead of adjusted at fiscal year-end to account for actual results. Second, the calculation of
percentages did not include the General Fund and therefore the Water and Wastewater Enterprise
Funds contributed more towards shared costs. In correcting these errors, the cost allocation
percentages for the enterprise funds were reduced. For example, in Fiscal Year 2015-16, the Water
Enterprise Fund percentage was reduced from 33.84% ($494,599) to 10.06% ($148,058) and the
Wastewater Enterprise Fund percentage was reduced from 50.46% ($737,479) to 16.34% ($240,515).
(JJACPA, September 2016)
The methodology used to calculate the over-allocation amounts were found to be reasonable and
accurate by the City’s external auditors, JJACPA Inc. In FY 2016-17, the City’s Emergency Contingency
Reserve, the Economic Stabilization Reserve, and $100,000 from the Litigation Reserve were used to
repay the Water Enterprise Fund $847,175 and the Wastewater Enterprise Fund $1,152,825, in addition
to the General Fund and the Wastewater Enterprise Fund entering into a five-year interfund loan in the
amount of $187,105 plus interest to repay the over-allocation. The corrected methodology for the City’s
Cost Allocation Plan has been used by staff since Fiscal Year 2016-17. (Fort Bragg, November 2016)
The result of the new Cost Allocation Plan for non-personnel overhead costs is a significant loss of
reoccurring revenue to the General Fund, or a budget basis structural deficit. In Fiscal Year 2016-17, the
amount of General Fund revenue loss was $788,000 when compared with FY 2015-16. In Fiscal Year
2017-18, the amount of General Fund revenue loss is projected to be $692,000 when compared with FY
2015-16. The loss of General Fund revenue is currently being somewhat offset by growth in other
revenue categories and containing costs. While the General Fund has sufficient undesignated fund
balance to withstand the General Fund deficits in FY 2016-17 and FY 2017-18, the City will need to find a
long-term solution potentially involving both cost saving and revenue-generating measures. (Fort Bragg,
June 2017)
2.5.3.2 Fiscal Year 2017-18 Budget
The information provided in this section is from the May 24, 2017 City Council Staff Report which
accompanied the Proposed Budget for Fiscal Year 2017-18. In FY 2017-18, the General Fund operating
budget is projected to have revenues of $9.05 million and appropriations budgeted at $9.38 million.
While some portion of the $354,000 operating deficit is comprised of one-time capital projects, the
General Fund is generally operating at a loss. The fund balance in the General Fund is expected to
Chapter 2 – Overview Page 2-8
MSR/SOI Update | City of Fort Bragg
decrease from $2.41 million in FY 2016-17 to $2.05 million in FY 2017-18. Once reserves and
encumbrances are taken into account, the unassigned fund balance in the General Fund is projected to
be $301,000. The decline in fund balance for the General Fund is primarily due to the implementation of
a new cost allocation plan beginning in FY 2016-17, repayment to the Water and Wastewater Enterprise
Funds for prior year over-payment based on the old cost allocation plan, and increasing expenses
outpacing slow revenue growth. (Fort Bragg, May 2017)
Personnel costs are the largest part of the City’s operating budget, totaling $8.37 million in FY 2017-18
which is an increase of 4.2% from FY 2016-17. This includes increases in salaries and wages as a result of
scheduled merit increases, negotiated wage increases, and increases in the cost of employee benefits.
While City Council has some control over these costs through the authorization of staff positions and
collective bargaining agreements, many of the forces driving up personnel costs are outside the City’s
control, including increased premiums for health benefits, CalPERS, and workers compensation. (Fort
Bragg, May 2017)
The primary sources of General Fund revenue are taxes, including sales tax, Transient Occupancy Tax
(TOT), property tax, and franchise taxes, and charges for services. TOT is projected to increase
significantly as a result of Measure AA, which raised the TOT rate from 10% to 12%. The additional funds
generated by Measure AA will not directly address the General Fund deficit since the revenue will be
fully offset by new expenditures in accordance with Measure AB. However, general TOT revenues are
expected to increase by 5.5% in FY 2017-18 and this projected revenue gain will help to address the
General Fund deficit. (Fort Bragg, May 2017)
While the City faces revenue constraints, there are no proposed reductions in City services. In addition,
the City continues to address high priority public facility and infrastructure needs through grants, low
interest loans, and special revenue funds.
2.5.4 ENTERPRISE FUNDS
As enterprise operations, the City’s water system and MID No. 1’s wastewater system are financed and
operated such that the cost of providing services to customers is almost entirely financed or recovered
through use charges or service rates. The following tables show the revenues, expenses, and changes in
fund balance for the City’s Water and Wastewater Enterprise Funds based on audited financial
statements for FYs 2013-14, 2014-15, and 2015-16.
Table 2.5 City of Fort Bragg Financial Summary (Water Enterprise)
FY 2013-14 FY 2014-15 FY 2015-16
Beginning Fund Balance $ 2,726,698 $ 2,388,578 $ 2,787,966
Prior Period Adjustments $ (85,386) $ - $ -
Ending Fund Balance $ 2,388,578 $ 2,787,966 $ 3,806,373
Operating Revenues
Charges for services $ 2,228,589 $ 2,460,658 $ 2,595,679
Other operating revenues $ - $ 34,955 $ 28,267
Total Operating Revenues $ 2,228,589 $ 2,495,613 $ 2,623,946
Operating Expenses
Personnel services $ 672,254 $ 669,320 $ 673,226
Administration $ 463,937 $ 636,837 $ 622,660
Chapter 2 – Overview Page 2-9
MSR/SOI Update | City of Fort Bragg
Table 2.5 City of Fort Bragg Financial Summary (Water Enterprise)
FY 2013-14 FY 2014-15 FY 2015-16
Repairs and maintenance $ 408,547 $ 53,894 $ 98,235
Materials and supplies $ 187,663 $ 274,495 $ 227,644
Utilities $ 95,386 $ 106,887 $ 105,090
Contractual services $ 107,300 $ 64,918 $ 90,478
Insurance $ 18,103 $ - $ 16,755
Depreciation $ 323,135 $ 332,729 $ 298,264
Total Operating Expenses $ 2,276,325 $ 2,139,080 $ 2,132,352
Non-Operating Revenues (Expenses)
Interest income $ 21,782 $ 27,168 $ 14,847
Other non-operating revenues $ 13,270 $ 63,741 $ 182,744
Loss on disposition of capital assets $ (23,761) $ - $ -
Bond issue costs $ (67,700) $ - $ -
Interest expense $ (171,191) $ (147,070) $ (131,645)
Total Non-Operating Income/(Loss) $ (227,600) $ (56,161) $ 65,946
Other Financing Sources (Uses)
Transfers In $ 22,602 $ 1,809,025 $ 547,175
Transfers Out $ - $ (1,710,009) $ (86,308)
Total Other Financing $ 22,602 $ 99,016 $ 460,867
Net Income/(Loss) $ 252,734 $ 399,388 $ 1,018,407
Source: (Fort Bragg, January: 2015, 2016, & 2017)
The water enterprise operating revenue in FY 2015-16 consisted of $2,595,679 in service charges and
$225,858 in other revenues, including interest income. The water enterprise operating expenditures in
FY 2015-16 were $2,132,352, which included depreciation, and $131,645 in interest expense. In
addition, there was a net total of $460,867 transferred into the water enterprise fund in FY 2015-16.
Comparing revenues to expenses is one way to measure the annual fiscal health of enterprise
operations. In FY 2013-14, expenses exceeded revenues by $275,336. In FY 2014-15, revenues exceeded
expenses by $300,372. In FY 2015-16, revenues exceeded expenses by $557,540. This indicates that
under current levels of maintenance and capital improvements, the City’s water enterprise annual
revenue is generally sufficient to cover annual operating costs. In addition, the FY 2015-16 year-end
water enterprise fund balance was $3,806,373.
Table 2.6 City of Fort Bragg Financial Summary (Wastewater Enterprise)
FY 2013-14 FY 2014-15 FY 2015-16
Beginning Fund Balance $ 7,940,554 $ 7,929,094 $ 7,687,401
Prior Period Adjustments $ (16,878) $ (690,158) $ -
Ending Fund Balance $ 7,929,094 $ 7,687,401 $ 8,203,285
Operating Revenues
Charges for services $ 3,004,493 $ 3,194,149 $ 3,332,333
Total Operating Revenues $ 3,004,493 $ 3,194,149 $ 3,332,333
Operating Expenses
Chapter 2 – Overview Page 2-10
MSR/SOI Update | City of Fort Bragg
Table 2.6 City of Fort Bragg Financial Summary (Wastewater Enterprise)
FY 2013-14 FY 2014-15 FY 2015-16
Personnel services $ 1,061,418 $ 1,127,997 $ 1,150,738
Administration $ 689,511 $ 785,794 $ 849,141
Repairs and maintenance $ 418,749 $ 133,670 $ 84,425
Materials and supplies $ 148,731 $ 189,140 $ 196,505
Utilities $ 120,050 $ 119,030 $ 119,393
Contractual services $ 168,763 $ 88,856 $ 102,494
Insurance $ 25,502 $ 23,821 $ 17,967
Other operating expenses $ - $ 1,721 $ 47,404
Depreciation $ 308,851 $ 314,016 $ 317,785
Total Operating Expenses $ 2,941,575 $ 2,784,045 $ 2,885,852
Non-Operating Revenues (Expenses)
Interest income $ 8,146 $ 12,157 $ 8,420
Other non-operating revenues $ 6,512 $ 52,310 $ 82,957
Loss on disposition of capital assets $ (34,057) $ - $ -
Interest expense $ (16,841) $ (16,456) $ (11,627)
Total Non-Operating Income/(Loss) $ (36,240) $ 48,011 $ 79,750
Other Financing Sources (Uses)
Transfers In $ - $ 933,394 $ 335,589
Transfers Out $ (21,260) $ (943,044) $ (345,936)
Total Other Financing $ (21,260) $ (9,650) $ (10,347)
Net Income/(Loss) $ 5,418 $ 448,465 $ 515,884
Source: (Fort Bragg, January: 2015, 2016, & 2017)
The Wastewater Enterprise operating revenue in FY 2015-16 consisted of $3,332,333 in service charges
and $91,377 in other revenues, including interest income. The wastewater enterprise operating
expenditures in FY 2015-16 were $2,885,852, which included depreciation, and $11,627 in interest
expense. In addition, there was a net total of $10,347 transferred out of the wastewater enterprise fund
in FY 2015-16.
As with the Water Enterprise Fund, revenues consistently exceeded expenses during the audited fiscal
years provided: in FY 2013-14 by $26,678, in FY 2014-15 by $458,115, and in FY 2015-16 by $526,231.
This indicates that under current levels of maintenance and capital improvements, the City’s
Wastewater Enterprise annual revenue is generally sufficient to cover annual operating costs. In
addition, the FY 2015-16 year-end Wastewater Enterprise fund balance was $8,203,285.
2.5.4.1 Fiscal Year 2017-18 Budget
The Wastewater and Water Enterprise Funds are fiscally healthy. In FY 2016-17, both funds received an
increase in revenue from the General Fund Cost Allocation Plan repayments and will incur lower costs
from the corrected cost allocation formula in moving forward. The fund balances in the Wastewater and
Water Funds are projected to decline in FY 2017-18 due to implementing the Capital Improvement
Program and utilizing fund balance for one-time capital expenses, including $11.1 million in
expenditures for Wastewater Enterprise projects and $3.4 million in expenditures for Water Enterprise
Chapter 2 – Overview Page 2-11
MSR/SOI Update | City of Fort Bragg
projects. On-going operating revenues in the Enterprise Funds are keeping pace with operating
expenditures. Revenue in the Wastewater Enterprise is projected to increase from $3.24 million in FY
2016-17 to $3.34 million in FY 2017-18 and operating expenses (excluding transfers) are projected to
decrease from $2.69 million in FY 2016-17 to $2.36 million in FY 2017-18. Water Enterprise Fund
revenues are projected to increase from $2.57 million in FY 2016-17 to $2.67 million in FY 2017-18 and
operating expenses (excluding transfers) are projected to decrease from $2.12 million in FY 2016-17 to
$2.10 million in FY 2017-18. (Fort Bragg, May 2017)
2.5.4.2 Service Rates
Charges for Water and Wastewater Enterprise services provided within and outside the City limits are
periodically reviewed and adjusted to ensure that sufficient revenue is generated to pay all operating
expenses as well as build capital reserves. The current water rates went into effect on July 1, 2013 and
are shown in Figure 2-3. The water rate structure includes a fixed monthly charge based on the size of
the water connection and type of property, and a variable charge based on actual monthly water usage
per 100 cubic feet of metered water.
Figure 2-3 City of Fort Bragg Water Service Rates
The current wastewater rates also went into effect on July 1, 2013 and are shown in Figure 2-4. The
wastewater rate structure includes a fixed monthly charge for each dwelling and commercial unit and a
Chapter 2 – Overview Page 2-12
MSR/SOI Update | City of Fort Bragg
variable charge based on actual monthly water usage for all accounts, except single family residences,
which is based on winter water usage between November and February.
Figure 2-4 City of Fort Bragg Wastewater Service Rates
In FY 2016-17, the City prepared updated rate studies for water and wastewater services to determine
the appropriate timing for implementing the rate increase schedule that was approved in 2013 and
which was temporarily suspended in FY 2016-17. Based on revenue transfers from the General Fund to
the Enterprise Funds due to the cost allocation error, the rate increases for the enterprise funds will be
postponed until FY 2018-19.
2.5.5 LONG TERM FINANCIAL CONSIDERATIONS
2.5.5.1 Reserves
The City’s fiscal policies, including Fund Balance and Reserve Policies, were updated as part of the FY
2016-17 budget process and prompted the City Council to commit to new reserve levels. Updated
policies are listed below.
Emergency Contingency Reserve: The General Fund balance committed for emergency contingencies is
established at an amount equivalent to 10% to 15% of the City's annual operating budget for the
General Fund. Depending on the type and severity of the emergency, this range is intended to provide
for an initial municipal response to events such as natural disasters, catastrophic accidents, or other
declared emergency incidents sufficient to provide a bridge until access to county, state or federal
support can be achieved. The Emergency Contingency Reserve is committed fund balance and may only
be used when there is a declaration of a state or federal state of emergency or a local emergency as
defined in Fort Bragg Municipal Code Section 2.24.020.
Chapter 2 – Overview Page 2-13
MSR/SOI Update | City of Fort Bragg
Economic Stabilization Reserve: The General Fund balance committed for the purpose of stabilizing the
delivery of City services during periods of severe operational budget deficits and to mitigate the effects
of major unforeseen changes in revenues and/or expenditures is established at an amount equivalent to
5% to 10% of the City's annual operating budget for the General Fund. This range serves as a cushion to
safeguard the City's fiscal health against fluctuations in revenues and costs due to economic volatility.
City Council approval shall be required before expending any portion of this committed fund balance.
Access to these funds will be reserved for economic emergency situations such as unanticipated major
declines in revenue, budgeted revenue taken over by another entity, or a catastrophe exceeding of
funds in the Emergency Contingency Reserve.
General Fund Operating Reserve: The City will maintain an unrestricted fund balance of at least 15% to
20% of the annual operating expenditures in the General Fund, as an “Operating Reserve” to ensure
liquidity of the General Fund and to ensure adequate cash flow throughout the year. This reserve is
necessary to accommodate fluctuations in the timing of expenditures and the receipt of revenues. The
reserve is not committed fund balance and may be allocated, with Council authorization, for unforeseen
operating or capital needs.
Litigation Reserve: The City will maintain a $300,000 Litigation Reserve to cover unforeseen legal
expenses, including unbudgeted settlement costs that are not covered by the City’s insurance pool.
In FY 2016-17, the Emergency Contingency Reserve and Economic Stabilization Reserve were used to
help reimburse the Water and Wastewater Enterprise Funds for past year over-allocations to the
General Fund. If funded at the levels designated by the reserve policies, the Emergency Contingency
Reserve would require $938,000 and the Economic Stabilization Reserve would require $469,000. In
future years, these two reserves will be replenished as funding becomes available. In FY 2017-18, the
General Fund is projected to have two funded reserves totaling $1.6 million, including an Operating
Reserve funded at 15% of the operating budget ($1.4 million), and a Litigation Reserve of $200,000. The
three Internal Service Funds include small reserves to help pre-fund large purchase and repairs and
maintain fund stability. In FY 2017-18, the Water Capital Reserve is projected to be reduced to $1.94
million and the Wastewater Capital Reserve is projected to either be reduced to zero or long-term
financing will be used for the Wastewater Treatment Plant Upgrade Project. (Fort Bragg, May 2017)
2.5.5.2 Outstanding Debt
The City has a number of long-term bonds and loans for the General Fund and the Water, Wastewater,
and CV Starr Enterprise Funds, as shown in Figure 2-5. As of Fiscal Year 2016-17, the City owed $811,145
in outstanding debt. The City has not defaulted on repayment of any bonds or other debt.
Chapter 2 – Overview Page 2-14
MSR/SOI Update | City of Fort Bragg
Figure 2-5 City of Fort Bragg Debt Summary
Source: (Fort Bragg, March 2017)
2.5.5.3 Capital Improvement Plan
The City’s Five-Year Capital Improvement Program (CIP) is a planning tool that identifies current and
future major capital projects for the City and prioritizes capital funding needs. The CIP identifies funding
needs for infrastructure construction and non-routine maintenance. CIP projects, including streets,
buildings, recreational facilities, and parks are defined as assets with an initial individual cost of at least
$50,000 and an estimated useful life of greater than two years. (Fort Bragg, May 2017)
The CIP identifies expenditures and funding for capital projects over the next five years, including FY
2017-18 through FY 2021-22. The CIP is comprised of 35 projects with a total cost of approximately $40
million as shown in Figure 2-6. For projects which span multiple years, a “Prior Year” funding column is
shown. There is also a “Beyond CIP” funding column for future significant capital projects that extend
beyond the five-year CIP planning period. There are 15 projects, totaling approximately $16.8 million,
planned for appropriation in FY 2017-18. Projected expenditures shown for FY 2018-19 through FY 2021-
22 and Beyond CIP do not reflect a commitment of funds and will be considered for approval in the
appropriate fiscal year. (Fort Bragg, May 2017)
Chapter 2 – Overview Page 2-15
Project Prior FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 5 year CIP Beyond Total Project
Proposed
Fund Number Project Category/Name FY(s) Budget Projected Projected Projected Projected Total CIP Costs
MUNICIPAL FACILITIES
416 PWP-00094 Guest House Rehabilitation $ 213,730 $ 70,000 $ 80,000 $ - $ - $ - $ 363,730 $ - $ 363,730
417 PWP-00095 City Hall - Painting, Roofing & Generator 7 7,000 - 60,000 137,000 137,000
418 PWP-00102 East City Hall, Structural, Pool Bldg & Other 7 2,700 226,500 68,000 367,200 367,200
PWP-00108 Police Station Garage 20,000 180,000 200,000 70,000 270,000
Town Hall Exterior Painting - 60,000 60,000 60,000
N/A Main St Fire Station Rehab - - 1,950,000 1,950,000
N/A Highway 20 Fire Station - - 5 00,000 500,000
N/A Rule 20 Project (undergrounding utilities) - - 1,200,000 1,200,000
Total Municipal Facilities 363,430 316,500 388,000 - - 60,000 1,127,930 3,720,000 4,847,930
PARKS & COMMUNITY SERVICES
407 CDD-00020 Glass Beach Staircase 3 2,807 162,000 194,807 194,807
415 CDD-00020 Coastal Trail - Phase II (central Segment) 9 9,422 950,578 170,000 1,220,000 1,220,000
Guest House Park Signs & Walkway - 45,000 45,000 45,000
419 PWP-00096 Bainbridge Park Improvements 7 5,000 33,290 108,290 108,290
Total Parks & Community Services 207,229 1,145,868 215,000 - - - 1,568,097 - 1,568,097
STREET MAINTENANCE & TRAFFIC SAFETY
414 PWP-00097 Alley Rehabilitation 300,000 750,000 750,000 750,000 2,550,000 2,550,000
PWP-00099 Downtown Crosswalk Rehabilitation - 62,300 - 62,300 62,300 124,600
405 PWP-00100 Street Resurfacing & Structural Repairs 1,084,879 - 2,000,000 2,000,000 5,084,879 5,084,879
413 PWP-00079 Chestnut Street Multi Use Trail 1,380,000 - 1,380,000 1,380,000
PWP-00101 South Main St Bike & Ped Improvements - - 8 00,000 800,000
Total Street Maint. & Traffic Safety 2,764,879 812,300 2,000,000 750,000 2,000,000 750,000 9,077,179 8 62,300 9,939,479
WATER ENTERPRISE
615 PWP-00017 Summers Lane Reservoir Cover 700,000 700,000 700,000
Water Tank Installation 1,395,349 1,395,349 1,395,349
PWP-00092 Water Treatment Plant Overhaul 50,000 800,000 500,000 1,350,000 1,350,000
Pudding Creek Water Main Relocation 205,000 1,495,000 1,700,000 1,700,000
Raw Water Line Engineering, Phases II through V 400,000 400,000 400,000
Raw Water Line Replacement: Phase II -
Noyo River to Water Treatment Facility 682,000 682,000 682,000
Raw Water Line Replacement: Phase III -
Newman Reservoir to Noyo River - 906,000 906,000 906,000
Raw Water Line Replacement: Phase IV -
Hare Creek to SR 20 - 420,000 420,000 420,000
Raw Water Line Replacement: Phase V -
Forest Road 450 to Hare Creek - 241,000 241,000 241,000
Raw Water Pond Rehabilitation - 200,000 200,000 200,000
Cedar Street Water Distribution Line
Replacement - 195,000 195,000 195,000
PWP-00078 Water Tank Replacement - - 1,600,000 1,600,000
WTR-00012 East FB Pressure Zone (EFBPZ), Phase 1 - - 5 25,000 525,000
N/A EFBPZ - Phase 2 - - 3 20,000 320,000
N/A EFBPZ - Phase 3 - - 5 60,000 560,000
Total Water Enterprise - 3,432,349 2,601,000 1 ,220,000 695,000 241,000 8,189,349 3,005,000 1 1,194,349
WASTEWATER ENTERPRISE
WW Treatment Facility Upgrade- Activated
716 WWP-00010 Sludge 699,000 1 1,000,000 1 1,699,000 - 1 1,699,000
Sewer Main Rehabilitation 60,000 60,000 60,000 60,000 60,000 300,000 - 300,000
Sanderson Way Sewer Main Replacement -
WWP-00011 Oak to Cedar - 215,000 215,000 - 215,000
Total Wastewater Enterprise 699,000 1 1,060,000 60,000 60,000 275,000 60,000 1 2,214,000 - 1 2,214,000
Grand Total $ 4,034,538 $ 16,767,017 $ 5 ,264,000 $ 2,030,000 $ 2 ,970,000 $ 1 ,111,000 $ 32,176,555 $ 7,587,300 $ 39,763,855
MSR/SOI Update | City of Fort Bragg
2.6 GROWTH AND POPULATION PROJECTIONS
2.6.1 PRESENT AND PLANNED LAND USE AND DEVELOPMENT
While Fort Bragg is a small community, it is the largest city on the coast between San Francisco and
Eureka and is a popular tourist and recreational destination. Commercial land uses in the City are
located along the State Highway 1 and Franklin Street corridors. The Central Business District, located
between Oak Street and Pine Street, is the historic, civic and cultural core of the community. Industrial
lands are located on the Georgia-Pacific mill property located west of State Highway 1 on North Franklin
Street, immediately north of the Central Business District, and on State Highway 1 north of Pudding
Creek. Residential neighborhoods are located east of the commercial core and in the west Fort Bragg
area. (Fort Bragg, 2012b)
Commercial fishing and recreational boating and fishing operate out of Noyo Harbor, which is an all-
weather port and the most active harbor between Bodega Bay and Eureka. The Noyo Harbor District has
constructed 256 berths since 1968. The berths are regularly occupied, with approximately 43% of the
boats moored there being commercial craft. The lower harbor area also contains parking and ship
building areas, boat launching and repair facilities, fish processing plants, and marine supply stores.
Commercial businesses, including visitor-oriented restaurants, are clustered on the north bank of the
harbor. Approximately a half-mile upriver, on the south side of the river, the Dolphin Cove private
commercial marina provides berths for about 150 boats, most of which are recreational. Several
jurisdictions share responsibility for the Noyo Harbor, which is largely located in the County's jurisdiction
and within the City's Sphere of Influence. (Fort Bragg, 2008)
The City has a full range of land uses including low to high density residential, retail and service
commercial, manufacturing, public facilities, recreation, and open space. The General Plan Land Use
Element establishes policies and programs to maintain the existing pattern of land uses within the City
while anticipating and providing for future growth and development. The 2012 Inland General Plan Land
Use Element includes the following land use designations for the Inland area of the City:
o Large Lot Rural Residential (RR5) o General Commercial (CG)
o Medium Lot Rural Residential (RR2) o Highway Visitor Commercial (CH)
o Rural Residential (RR1) o Office Commercial (CO)
o Suburban Residential (RS) o Heavy Industrial (IH)
o Low Density Residential (RL) o Light Industrial (IL)
o Medium Density Residential (RM) o Parks and Recreation (PR)
o High Density Residential (RH) o Agriculture (A)
o Very High Density Residential (RVH) o Open Space (OS)
o Central Business District (CBD) o Public Facilities and Services (PF)
o Neighborhood Commercial (CN)
These land use designations are implemented by the City’s zoning regulations established by the Inland
Land Use and Development Code provided in Chapter 18 of the Fort Bragg Municipal Code.
Making up a large area of the City is the old Georgia Pacific mill site, which has not been in operation
since 2002. The site is located in the Coastal Zone and is currently zoned for industrial uses. The City is
working on rezoning this 320-acre property based on the Draft 2012 Mill Site Specific Plan. In addition to
the land use designations listed above, the 2008 Coastal General Plan Land Use Element includes Timber
Chapter 2 – Overview Page 2-17
MSR/SOI Update | City of Fort Bragg
Resources Industrial (IT) and Harbor District (HD). For land within the Coastal Zone, land use
designations are implemented by the City’s zoning regulations established by the Coastal Land Use and
Development Code provided in Chapter 17 of the Fort Bragg Municipal Code.
The largest employment categories in the City include health care, public education, local government,
wholesale and retail trade, and tourism. The City’s largest employers include the hospital, school district,
City government, Caito Fisheries, a number of retailers including Safeway, Harvest Market, Rite Aid,
Mendo Mill, Rossi’s Lumber Company, and a number of restaurants and hotels (Fort Bragg, 2014).
It is expected that City growth will continue to occur at a slow but regular pace. No significant growth is
projected for the City within the next five years, barring any unanticipated new businesses or major
expansion of existing business. In addition, no significant growth is projected in adjacent unincorporated
areas of Mendocino County over the next five years. The following potential new development projects
may occur within the planning horizon of this MSR:
o Hare Creek Center, a 29,500 square-foot retail development at the corner of State Highway 1
and State Highway 20. The City Council is anticipated to consider this project in 2017.
o Avalon Hotel, a 65 unit hotel with a restaurant and bar. This application is currently deemed
incomplete.
o A 15,000 square-foot retail development south of Noyo River Bridge. No application is on file for
this project.
o Replacement of an asphalt plant. No application is on file for this project.
o 50 unit housing project, 25 units affordable and 25 units market rate housing. No application is
on file for this project.
(Fort Bragg, March 2017)
Over the next 10-20 years, a portion of the Mill Site property may be slowly built out with a mix of
residential, commercial, industrial, and visitor-serving development. The January 2012 Draft Mill Site
Specific Plan includes preliminary projects including 532 new residences contributing approximately
1,233 in population growth, 795,00 square-feet (SF) in new commercial and industrial space contributing
approximately 1,772 new jobs, and 450 hotel rooms contributing approximately 175 new jobs (Fort
Bragg, March 2017). However, the Community is restarting the planning process for this site and
anticipates a reduction in the total area dedicated to new uses.
Based on the 2012 Inland General Plan Land Use Element 2022 buildout projections, there are 3,313
existing residential units within the City and an additional 200 residential units within the City’s SOI.
Further, it is estimated that an additional 250 residential units will be built within the City and 15
residential units within the City’s SOI by 2022, for a total increase of 265 residential units. In addition to
new residential development, the City has projected an increase of 143,000 SF in new commercial
development, 20,000 SF in new industrial development, and 100 new Lodging rooms by 2022. (Fort
Bragg, 2012b)
2.6.2 EXISTING POPULATION AND PROJECTED GROWTH
There are approximately 7,287 people residing in the City of Fort Bragg and the average household size
is 2.47 persons (U.S. Census Bureau, 2016b). To determine the estimated population size for the City’s
SOI, MID No. 1, and the District’s SOI, the number of residential units or residential service connections
is multiplied by the average household size as shown in the table below. As noted in the section above,
Chapter 2 – Overview Page 2-18
MSR/SOI Update | City of Fort Bragg
there are approximately 200 residential units within the City’s SOI. MID No. 1 has approximately 2,450
residential service connections. The SOI for MID No. 1 contains 125 parcels but the number of
residential units is unknown.
Table 2.8 City of Fort Bragg Population Size
Area Population
City of Fort Bragg 7,287
City SOI 494
MID No. 1 6,052
District SOI Unknown
With an annual growth rate of 0.2% (U.S. Census Bureau, 2016b), the City and surrounding areas are
anticipated to experience minimal change in population size over the next 5-10 years. The table below
shows the projected growth for the City in 2026 based on this annual growth rate.
Table 2.9 City of Fort Bragg Projected Growth
Annual Growth Rate Projected Population
2016 Population
(%) (2026)
7,287 0.2 7,433
2.7 DISADVANTAGED UNINCORPORATED COMMUNITIES
Senate Bill (SB) 244, which became effective in January 2012, requires LAFCo to evaluate any
Disadvantaged Unincorporated Communities (DUCs), including the location and characteristics of any
such communities, when preparing an MSR that addresses agencies that provide water, wastewater or
structural fire protection services. A DUC is an unincorporated geographic area with 12 or more
registered voters with a median household income of 80% or less of the statewide median household
income (MHI) of $61,818 (U.S. Census Bureau, 2016a). This State legislation is intended to ensure that
the needs of these communities are met when considering service extensions and/or annexations in
unincorporated areas.
The median household income for Fort Bragg is $33,867, which is 55% of the statewide median
household income (U.S. Census Bureau, 2016b). The City is therefore considered to be a disadvantaged
community and may have adjacent DUCs. Special consideration will be given to any DUCs affected by
future annexation proposals consistent with GC §56375(8)(A) and LAFCo Policy. The City is responsible
for providing water and wastewater services. The Fort Bragg Fire Protection Authority is responsible for
providing structural fire protection services.
Pursuant to GC §65302.10(b), SB 244 also requires each City to plan for DUCs in their General Plan Land
Use Element in conjunction with adopting their Housing Element. To comply with this requirement, each
City must identify, describe, and map each island and fringe community within the City’s Sphere of
Influence that qualifies as a DUC; analyze the water, wastewater, stormwater drainage, and structural
fire protection needs or deficiencies of the DUCs; and analyze potential funding mechanisms that could
make the extension of services to the DUCs financially feasible.
Chapter 2 – Overview Page 2-19
MSR/SOI Update | City of Fort Bragg
3 MUNICIPAL SERVICE REVIEW
3.1 SERVICE OVERVIEW
This section provides information regarding the wide range of municipal services provided by the City of
Fort Bragg including the following:
o General Government
o Finance
o Community Development
o Law Enforcement
o Public Works
o Water
o Wastewater
Additional City services are provided by other public agencies, independent special districts, contractors,
and Joint Powers Authorities (JPAs) as detailed in Table 3.1. This MSR only reviews services provided by
the City and MID No. 1. This is the second MSR prepared for the City; the first one was adopted by the
Commission in 2008.
Chapter 3 – Municipal Service Review Page 3-1
MSR/SOI Update | City of Fort Bragg
Table 3.1 City of Fort Bragg Municipal Service Providers
Municipal Service Service Provider
General Government
City Manager City of Fort Bragg
City Attorney Contract Service
City Clerk City of Fort Bragg
Finance City of Fort Bragg
Human Resources City of Fort Bragg
Information Technology City of Fort Bragg
Public Safety
Law Enforcement City of Fort Bragg
Emergency Medical Care Mendocino Coast Health Care District
Fire Protection Fort Bragg Fire Protection Authority JPA
Animal Control Mendocino County (Contract Service)
Community Development
Planning, Economic Development, Grant Writing City of Fort Bragg
Building Permit Processing & Inspection Mendocino County (Contract Service)
Community Services
Parks & Recreation City of Fort Bragg
Mendocino Coast Recreation and Park District
Library Mendocino County
Marina & Boating Services Noyo Harbor District
Public Works
Engineering, Drafting, Surveying City of Fort Bragg
Roads, Traffic Control, Non-Motorized Facilities City of Fort Bragg & Caltrans
Water Collection, Treatment, & Distribution City of Fort Bragg
Wastewater Collection, Treatment, & Discharge Fort Bragg Municipal Improvement District No. 1
Stormwater Management City of Fort Bragg
Public Buildings & Facilities Maintenance City of Fort Bragg
Street Lighting & Landscaping City of Fort Bragg
Solid Waste Disposal & Recycling Waste Management
Energy Sonoma Clean Power
Cable TV/Internet Services Comcast
Public Education
K-12 Grade Levels Fort Bragg Unified School District
College Level Mendocino College
Other Services
Housing Assistance Programs Community Development Commission
DANCO
Public Transportation Mendocino Transit Authority
Cemetery Mendocino-Little River Cemetery District
Westport-Ten Mile Cemetery District
Chapter 3 – Municipal Service Review Page 3-2
MSR/SOI Update | City of Fort Bragg
3.2 GENERAL GOVERNMENT
3.2.1 SERVICE OVERVIEW
The City’s Administration includes the City Manager, City Attorney, and the Administrative Services
Department, who together provide organizational leadership, implement City Council policy objectives,
and administer City services and programs. The City’s Administration works closely with and provides
support to each City department in the delivery of quality public services, to ensure efficient,
responsive, and accountable government, and promote fiscal stability, economic vitality, quality of life,
and citizen involvement.
The City has a Council-Manager form of government whereby City Council establishes key goals, policies,
and priorities for the City and the City Manager is responsible for ensuring sound and effective
management of the City based on implementing those goals, policies, and priorities.
The Administrative Services Department is responsible for a wide array of administrative services
including (Fort Bragg, July 2016):
o Technology infrastructure development and management
o Employee and labor relations
o Contract negotiations
o Personnel and administrative policies and regulations
o Employee benefits administration
o Personnel recruitment and retention
o Employee classification
o Compensation and evaluations
o Risk management
o Assistance with budget preparation and monitoring
o Preparing agenda packets, maintaining official records, responding to public records requests
o Monitoring compliance with Fair Political Practices Commission requirements
o Preparing ordinances for codification
o Maintaining and developing the City’s official website and social media pages
o Maintaining updates to the Fort Bragg Municipal Code
3.2.2 STAFFING
The City’s Administration is a General Government support function. In addition to the City Manager and
City Attorney, the City’s Administration is comprised of the Administrative Services Department, which
has six fulltime staff members including an Administrative Services Director, City Clerk, Human
Resources Technician, Administrative Assistant, Technology Support Technician, and an Audio-Visual
Technician. The City is seeking a new City Attorney as the existing contract with Burke, Williams,
Sorenson, LLP, expires in October of 2017. (Fort Bragg, July 2016; Fort Bragg, July 2017)
3.3 FINANCE
3.3.1 SERVICE OVERVIEW
The Finance Department is responsible for providing oversight to the City’s fiscal management and
operations, maintaining accurate fiscal records and reports, and providing advice regarding fiscal policies
Chapter 3 – Municipal Service Review Page 3-3
MSR/SOI Update | City of Fort Bragg
and transactions. The Department directs, monitors, and controls all assets and financial activity and
provides a framework for financial planning and analysis to support the operations of City departments.
The functions of the Finance Department include utility billing, business licensing, Transient Occupancy
Tax collections, accounts payable, account receivable, payroll, purchase orders, financial reporting to
Federal, State, and other outside agencies, treasury and cash management, budget preparation,
budgetary control, audit liaison and oversight of other fiscal activities of the City, Municipal
Improvement District, and the Successor Agency to the Fort Bragg Redevelopment Agency. (Fort Bragg,
July 2016)
3.3.2 STAFFING
The Finance Department is a General Government support function. The Department has four full-time
staff members including a Finance Director, two Government Accountants, and a Finance Technician.
(Fort Bragg, July 2016)
3.4 COMMUNITY DEVELOPMENT
3.4.1 SERVICE OVERVIEW
The Community Development Department serves the community by facilitating, guiding, and regulating
land use and development activities in Fort Bragg and with planning and implementing City
improvement projects. Department services include:
o Providing effective long-range planning, including rezoning and land use planning for the
Georgia Pacific Mill Site, updates to the City’s General Plan and Land Use and Development
Code, updates to the City’s Housing Element.
o Current planning services including permit processing and CEQA review for all land use permit
applications and environmental review (CEQA and NEPA) for all City projects.
o Implementation of a variety of special City projects including construction of the Fort Bragg
Coastal Trail Phase I and II and Bainbridge Park improvements.
o Review of all building and sign permits and code enforcement.
o Implementation of the City’s economic development strategy, management of the City’s
tourism promotions and Marketing Action Plan, and grant writing and administrative services.
(Fort Bragg, July 2016; Fort Bragg, July 2017)
3.4.2 STAFFING
The Community Development Department has four full-time employees including a Community
Development Director, Special Projects Manager, Associate Planner, Administrative Assistant, and a
Grants Assistant who is part-time at 0.8 FTE. (Fort Bragg, July 2016; Fort Bragg, July 2017)
3.5 LAW ENFORCEMENT
3.5.1 SERVICE OVERVIEW
The Fort Bragg Police Department provides public safety services on a 24-hour a day, seven-days a week
basis. The Police Department Administrative Office is located at 250 Cypress Street in Fort Bragg and
Chapter 3 – Municipal Service Review Page 3-4
MSR/SOI Update | City of Fort Bragg
normal business hours are Monday through Friday from 8:00 am to 5:00 pm. The Fort Bragg Police
Department contracts with the Ukiah Police Department for dispatch services.
The Police Department provides emergency and non-emergency police services to the community
through uniformed police officers and community service officers who provide public safety, investigate
crimes and traffic accidents, arrest law violators, enforce traffic and parking regulations, and provide a
variety of other community-oriented policing services. The department also provides customer service
to the community and supports police operations through administrative and business offices of the
Police Department, including the following: executive leadership, management and supervision,
management of reports, telephone inquiries, statistics, employee training, property and evidence
management, fingerprinting, and court coordination.
The following table provides a summary of calls for service for years 2013 through 2016.
Table 3.2 Fort Bragg Police Department Service Calls
Summary of Calls by Type 2013 2014 2015 2016 TOTAL
Crime Reports 1,925 1,681 1,643 1,749 6,998
Calls for Service 17,148 16,350 15,629 14,819 63,946
Arrests 869 721 722 548 2,860
TRAFFIC SAFETY
Collisions 176 185 182 186 729
Citations (VC only) 352 506 458 204 1,520
DUI 46 41 22 42 151
TOTAL 574 732 662 432 2,400
GANG
Gang Related Cases 11 9 6 11 37
Gang Affiliated 78 48 69 130 325
TOTAL 89 57 75 141 362
PROPERTY CRIMES
Burglary 96 53 31 52 232
Theft 284 195 219 254 952
10851 Motor Vehicle Theft 18 19 19 13 69
Vandalism 151 130 97 146 524
TOTAL 549 397 366 465 1,777
CRIMES AGAINST PERSONS
Homicide 1 1 0 1 3
Rape 6 7 8 8 29
Robbery 3 5 5 4 17
Assault 193 112 212 135 652
TOTAL 203 125 225 148 701
Source: (Fort Bragg, March 2017)
3.5.2 STAFFING
The Police Department has five administrative staff consisting of the Chief of Police, the Police
Lieutenant, an Administrative Coordinator, and two Police Service Technicians. The operations staff is
Chapter 3 – Municipal Service Review Page 3-5
MSR/SOI Update | City of Fort Bragg
comprised of four Sergeants, ten Police Officers, and three Community Service Officers. The department
has one Police Officer assigned to work the Mendocino County Major Crimes Task Force.
The Chief and Lieutenant, with the support of the Administrative Coordinator, are responsible for
providing department personnel with strategic goals and objectives, ensuring adequate staffing and
equipment, ensuring training and certification in accordance with California Peace Officers Standards
and Training (POST) regulations, managing the Department’s budget, and providing leadership direction.
They also serve as a liaison between the Police Department and other City departments and with
community members.
The Police Service Technicians ensure that all police records are kept, filed, released, and purged in
accordance with applicable laws. They are responsible for numerous State reports and validations,
provide Live Scan fingerprinting services to the public, process and forward criminal reports to the
appropriate agencies, and provide information to the public. They assist the public with a wide variety of
inquiries both over the phone and in person. One Police Service Technician is the Department’s Property
and Evidence Technician who assists with the intake of property for safe keeping and property held as
evidence, oversees the release and purging/destruction of department property, and is also the
Department’s subpoena clerk and is responsible for all criminal and civil subpoenas received by the
department. The other Police Service Technician is the Department’s Records Supervisor and is
responsible for overseeing all records activities.
The Police Officers and Community Service Officers, under the day-to-day supervision of the Sergeants,
respond to calls for service, conduct investigations, and write police reports relating to those calls. They
also respond to traffic accidents, traffic and parking complaints, and animal control issues. They deliver a
variety of prevention and awareness information to community members, service organizations, and
schools.
3.6 PUBLIC WORKS
3.6.1 SERVICE OVERVIEW
The Public Works Department designs, builds, operates, and maintains essential public infrastructure
and facilities. The basic services provided by the Public Works Department include
o Managing consultants and contractors who undertake a variety of public improvement projects
to the City’s public buildings, wastewater and water infrastructure, street system and public
parks.
o Maintaining and repairing City-owned facilities, parks, and streets, installing and maintaining
traffic signage.
o Managing, repairing, and expanding the drinking water system including collection, storage,
treatment, distribution and necessary reporting.
o Managing, repairing, and improving the wastewater system for MID No. 1 including collection,
treatment, discharge, and necessary reporting and managing the stormwater runoff system.
o Managing and necessary reporting for all stormwater pollution prevention permits.
o Assisting with the review of proposed development projects for planning and building permits.
Chapter 3 – Municipal Service Review Page 3-6
MSR/SOI Update | City of Fort Bragg
o Processing all roadway encroachment permits.
The Public Works Department is organized into six divisions including: Administration and Engineering,
Parks and Facilities, Corporation Yard and Fleet, Street Maintenance, Water Enterprise, and Wastewater
Enterprise. The Administration and Engineering Division provides administrative support, fiscal
management, and engineering services to the entire Public Works Department. In addition, this division
is also responsible for implementation of the City’s Capital Improvement Program and works closely
with various regulatory agencies to maintain permit compliance. The Parks and Facilities Division
provides maintenance and repairs for City facilities and grounds, parks, streets, and trees and also assist
with capital projects, as needed. The Corporation Yard and Fleet Division is responsible for maintenance
of City streets, including painted curbs, crosswalks, and signage, and maintenance and repairs of the
City’s wastewater collection lines, storm drains, water distribution system, utility meters, and fire
hydrants. The crew of this division also responds to sewage spills and leaks in water service lines. Fleet is
responsible for the maintenance of all City vehicles, heavy equipment, and other large equipment
throughout the City. The Public Works crew also provides support for civic and community events.
Water and Wastewater are operated as separate enterprises and are addressed in Sections 3.7 and 3.8
of this document.
3.6.2 STAFFING
The Public Works Department has 22 full-time employees including a Public Works Director, Assistant
Public Works Director, Public Works Project Analyst, two Engineering Technicians, a Lead Maintenance
Worker who oversees a Mechanic and seven Maintenance Workers, and 2 Lead Treatment Operators
that oversee 5 Treatment Plant Operators and an Environmental Compliance Coordinator. (Fort Bragg,
July 2016)
3.6.3 CAPITAL ASSETS
Capital assets include land, easements, buildings, equipment, and infrastructure that the City owns,
operates, and maintains to provide a variety of services to its citizens and customers.
3.6.3.1 Public Facilities
The City owns and maintains multiple public buildings including the City Hall, Town Hall, Police Station,
Guest House Museum, Fort Building, Gymnasium, Highway 20 Fire Station, and the Main Street Fire
Station. The City also owns and/or operates various public facilities including the Water Treatment Plant,
Summers Lane Reservoir, Corporation Yard, Caspar Transfer Station, C.V. Starr Center, Harold O.
Bainbridge Park, Otis R. Johnson Wilderness Park, Noyo Beach, Noyo Headlands Park, Pomo Bluffs Park,
and the Harbor Lite Trail. MID No. 1 owns the Wastewater Treatment Plant, collection system, and
discharge facilities that are accounted for in the District’s capital assets.
The City’s investment in capital assets for its governmental and enterprise activities totals $73 million as
of June 30, 2016, and includes land, construction in progress costs, buildings, machinery, equipment,
and vehicles, infrastructure, and land improvements, as shown in Table 3.3 below. Capital assets are
defined by the City as assets with an initial individual cost of more than $5,000 and an estimated useful
life in excess of two years. An exception to this is for infrastructure assets (roads, sidewalks, and similar
items) which have the same estimated minimum useful life but only account for infrastructure projects
that cost more than $50,000. (Fort Bragg, January 2017)
Chapter 3 – Municipal Service Review Page 3-7
MSR/SOI Update | City of Fort Bragg
Table 3.3 City of Fort Bragg Fiscal Year 2015-2016 Capital Assets
Asset Type Governmental Enterprise Total
Land $12,952,262 $785,079 $13,737,341
Construction in Progress $379,412 $1,427,055 $1,806,467
Buildings $1,885,295 $22,938,385 $24,823,680
Machinery, Equipment, & Vehicles $387,745 $1,936,376 $2,324,121
Infrastructure $23,581,455 $6,415,750 $29,997,205
Land Improvements $0 $320,863 $320,863
TOTAL $39,186,169 $33,823,508 $73,009,677
Source: (Fort Bragg, January 2017)
The City plans for capital projects through the rolling five-year Capital Improvement Program (CIP) as
part of the annual budget development process. Refer to Figure 2-6 for a list of public facilities projects
identified in the Fiscal Year 2018-2022 CIP.
3.6.3.2 Public Infrastructure
The Public Works Department is responsible for maintaining over 25 miles of City streets (not including
alleys) and associated infrastructure, traffic signage, and street markings. The street system in Fort
Bragg is laid out in a grid pattern with Main Street (State Highway 1) functioning as the primary north-
south roadway. Franklin Street is located one block east of Main Street and provides access along the
main commercial corridor. A number of streets, including Cypress Street, Chestnut Street, Oak Street,
Redwood Avenue, Pine Street, and Elm Street provide east-west connections.
State Highway 1 is the only continuous north-south road serving the Coast of Mendocino County,
providing a local transportation corridor for many communities and the primary access route for visitors.
Traffic volumes on this roadway have increased steadily over the years. A portion of the traffic in Fort
Bragg is through-traffic (trips that originate or have destinations outside of the City). The logging
industry, tourist travel, and people coming to Fort Bragg from around the region for shopping,
educational, medical, and other services generate much of the traffic. Traffic into and out of Fort Bragg
is constrained by the capacity of two bridges, Hare Creek and Pudding Creek, and by the two-lane
roadway sections along State Highway 1. The Hare Creek and Pudding Creek bridges are limited to one
lane of traffic in each direction. Caltrans is working on plans to rebuild both bridges in order to better
accommodate non-vehicular travel (pedestrians and cyclists). The Noyo River Bridge is a four lane bridge
with a center lane for emergency vehicles and a sidewalk on both sides. The bridge provides access at
the south end of the City and to State Highway 20 and generally operates at Level of Service “A”.
Level of Service (LOS) standards provide an indicator of the functional capacity of a roadway or
intersection and describe the relative ease or congestion of traffic movement on a roadway or at an
intersection. LOS "A" represents free flow conditions and LOS "F" represents jammed conditions where
traffic flow is at or over the capacity of the roadway and consequently moves very slowly. The most
congested street in the City is Main Street between the northbound merge area located just south of
Laurel Street through Elm Street. The northbound section of this road currently operates at LOS D to LOS
E during peak hours.
Although the volume of traffic on Main Street has increased over the past few years, intersections with
traffic signals, including State Highway 20, Ocean View Drive, Cypress Street, Chestnut Street, Oak
Chapter 3 – Municipal Service Review Page 3-8
MSR/SOI Update | City of Fort Bragg
Street, Laurel Street, Elm Street, and Redwood Avenue, are operating at LOS B or better. The side street
stop sign-controlled intersections with Main Street are also operating at LOS B or better for traffic
traveling on Main Street; although traffic turning onto Main Street from some side streets can
experience LOS D, E, or F during peak hours.
Land use and transportation must be coordinated so that the capacity of the transportation system will
accommodate the traffic generated by the development of the community. To understand the
relationship between land use and transportation, the new traffic that would be generated by the 10-
year buildout projections (2022) were added to existing traffic volumes on major streets for a summer
Friday mid-day peak hour when traffic is generally the most congested. Traffic projections indicate that
LOS will remain virtually identical to current conditions, taking into consideration anticipated
development in the Inland General Plan area. If all potential future development is taken into
consideration throughout the City, including anticipated development on the Mill Site, all intersections
and roadway segments will conform to the standards established by the Inland General Plan.
As Fort Bragg continues to grow, vacant and underdeveloped land east and west of Main Street will be
developed. The City's annexation policies discussed in the Inland General Plan Land Use Element
establish priorities for expansion of City boundaries in an orderly and planned manner. Annexation and
development in these areas will require development of and/or improvement to east-west access
routes, the development of new roads in some areas, and the extension of existing roads in other areas.
The City has a fairly complete sidewalk system. There are a few streets that have discontinuous
sidewalks, sidewalks on one side of the street, or substandard sidewalks. However, in recent years the
City has undertaken and completed many sidewalk improvement projects, specifically geared towards
providing safe-routes-to-school. Sidewalk widths vary, primarily based on the street type and the width
of the existing right-of-way. However the City has established minimum sidewalk width standards for all
new sidewalks. The City also has a system of Class I, II, and III bicycle facilities, which given the relatively
flat topography of the City, provides an effective bicycle system. The City continues to improve and
expand the pedestrian and bicycle facilities consistent with the 2011 Bicycle Master Plan, provide safe
and complete sidewalks throughout the City, and provide a mix of land use designations which reduce
dependence on vehicle travel between residential areas, schools, parks, and commercial centers. (Fort
Bragg, 2012a; Fort Bragg, July 2017)
There are approximately 100 alleys or alley segments included within the City limits. Most of these are
located within public right-of-ways, typically 20 feet in width, and there are a few privately-owned
alleys. The City’s alleys are used by vehicles, bicycles and pedestrians. The alleys serve as the primary
corridor for service providers (fire department, police department, solid waste collection, deliveries) and
are the preferred alignment for utilities including underground water, sanitary sewer and storm drain
pipelines and overhead and underground power, telephone and cable television/internet services. It is
the City’s goal to improve the condition of the City’s alleys to enhance the use of these corridors for
access and service. The 2011 Alley Master Plan provides an inventory and evaluates the condition of City
alleys and includes a prioritized list of alley improvement projects which the City is working to
implement. The City passed a gas tax increase to fund alley improvements and each year the City
undertakes about $200,000 of alley resurfacing capital improvement projects. In 2017, four alleys will be
resurfaced. (KASLConsulting Engineers, 2011; Fort Bragg, July 2017)
Chapter 3 – Municipal Service Review Page 3-9
MSR/SOI Update | City of Fort Bragg
The priority storm drain improvements in the 2004 Storm Drainage Master Plan have been
implemented. Much of the area north of Pudding Creek and south of the Noyo River generally do not
have improved drainage systems in place. Drainage in these areas is generally through natural channels
or site installed drainage pipes. Chapter 12.14, 17.60 and 18.60 of the City's Municipal Code require the
City to review and condition new development to ensure that adequate on-site and off-site drainage is
included in the development. New development is required to pay a drainage impact fee and thereby
fund improvements necessary to ensure adequate capacity within the storm drain system. (Fort Bragg,
2012c; Fort Bragg, July 2017)
The City plans for capital projects through the rolling five-year Capital Improvement Program (CIP) as
part of the annual budget development process. Refer to Figure 2-6 for a list of public infrastructure
projects identified in the Fiscal Year 2018-2022 CIP.
3.7 WATER ENTERPRISE
3.7.1 SERVICE OVERVIEW
The City public water system includes raw water collection, treatment, and distribution facilities, which
are owned and operated by the City. The Water Treatment Plant (WTP) is located at 31301 Cedar Street
in Fort Bragg. The WTP operates under Domestic Water Supply Permit Number 02-03-09P2310001,
issued by the State Water Resources Control Board Drinking Water Division on October 6, 2009 (Fort
Bragg, March 2017). The City currently serves approximately 2,829 water connections consisting
primarily of residential homes, 356 commercial customers, and 32 customers located outside the City
(Fort Bragg, July 2017).
3.7.2 STAFFING
The City has two Lead Treatment Operators, five level II Treatment Plant Operators, including one
Electrician, that operate and maintain the water treatment system and the wastewater treatment
system. For the water system, City staff is responsible for operating and maintaining the water
treatment plant, source water intakes, three water storage facilities, and various pump stations. The
transmission and distribution systems including water meters are maintained by the Public Works
maintenance crew; this division includes five distribution operators. (LAFCo, 2008; Fort Bragg, July
2017).
3.7.3 CAPACITY OF FACILITIES
The City’s water system is comprised of three surface water sources including the new Summers Lane
Reservoir constructed in 2015; three raw water transmission mains; two raw water storage ponds
located at the WTP; the WTP that was originally constructed in the 1950’s and upgraded in the 1980’s
and has a capacity of 2.2 million gallons per day (MGD); two 1.5 million gallon (MG) steel storage tanks
and one 300,000 gallon storage tank; over 30 miles of distribution lines that deliver water throughout
Fort Bragg; and one booster pump station for the East Fort Bragg pressure zone (LAFCo, 2008).
Additionally the City has funding for and will add an additional 1.5 million gallon finished water storage
tank in Fiscal Year 2017-18. (LAFCo, 2008; Fort Bragg, July 2017)
The City’s water supply system draws raw water primarily from the Noyo River with the limitation that
pumping does not exceed 3.0 cubic feet per second (cfs). The Noyo River direct diversion flows by
gravity into a 5,000 gallon wet well and is then pumped via pipeline to the WTP from a pump station on
Chapter 3 – Municipal Service Review Page 3-10
MSR/SOI Update | City of Fort Bragg
the river bank. The Newman Reservoir is an on-stream reservoir located on a 54-acre parcel owned by
the City of Fort Bragg and impounds water from the Newman Gulch. The Summers Lane Reservoir is a
new reservoir with a capacity of 45 acre-feet (AF) located on this same property. The Summers Lane
Reservoir is an off-stream storage facility that holds water from Waterfall Gulch. Approximately 20% of
the City’s water supply during the summer months is drawn from the Newman and Summers Lane
Reservoirs and approximately 25% throughout the year is from the Waterfall Gulch diversion, all of
which are gravity fed through a single ten-inch pipeline to the raw water storage ponds at the WTP.
(LAFCo, 2008; Fort Bragg, July 2017)
The table below shows the City’s approved water appropriations by water source.
Table 3.4 City of Fort Bragg Water Appropriations
Water Supply Permit or Estimated Reliable
Water Appropriations
Source License ID Pumping Capacity
1. Noyo River P11383 1,500 AF (488.777 MG) 3.0 cfs
2. Newman Gulch S009340 300 AF (97.755 MG) 0.5 cfs
3. Waterfall Gulch 012171 475 AF (154.779 MG) 0.668 cfs
Total n/a 2,275 AF (741.312 MG) 4.168 cfs
Source: (Fort Bragg, March 2017)
The City’s operational treated water storage requirement is 3.3 MG. The table below shows the water
storage capacity for each of the City’s water storage facilities.
Table 3.5 City of Fort Bragg Water Storage
Storage
Storage Facility
Capacity
Summers Lane Reservoir 14.6 MG
Newman Reservoir 0.3 MG
Water Fall Reservoir 0.005 MG
Raw Water Ponds 3.0 MG
Clearwell 0.025 MG
Total 17.93 MG
Source: (Fort Bragg, March 2017)
During Fiscal Year 2016-2017, the City completed the Summers Lane Reservoir Project providing an
additional 15 million gallons (MG) of raw water storage to help ensure a reliable water supply during the
late summer months when flows are low at the City’s three water sources (Fort Bragg, May 2017). In
addition, this new raw water storage will ensure adequate water supply during severe drought years
and will help to meet the needs of future development for the City.
3.7.4 DEMAND FOR SERVICES
The water system annual demand is approximately 250 MG or 767 acre-feet (AF) of drinking water.
During the summer months, the water demand peaks at around 0.900 MGD with the peak tourist
season. During winter months, the water demand averages 0.600 MGD. The table below shows the
water demand levels for fiscal year 2015-2016 by season.
Chapter 3 – Municipal Service Review Page 3-11
MSR/SOI Update | City of Fort Bragg
Table 3.6 City of Fort Bragg 2015-2016 Water Demand (MGD)
Maximum
Average Peak Day
Season Monthly
Demand Demand
Demand
Summer 0.7188 29.697 1.153
Winter 0.514 16.903 0.728
Source: (Fort Bragg, March 2017)
The table below shows the total historic water demand by source over the last 10 years, which includes
the range of wet to critically dry water year types.
Table 3.7 City of Fort Bragg Historic Annual Water Demand (MG)
Source 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
1 326.226 188.72 210.512 217.97 180.881 171.931 128.275 142.584 145.049 137.652
2 31.081 74.019 49.525 53.362 49.278 56.086 74.544 56.053 58.314 50.21
3 39.665 68.633 46.514 37.093 60.772 76.109 71.889 51.32 56.239 59.58
Total 396.972 331.372 306.551 308.425 290.931 304.126 274.708 249.957 259.602 247.442
Source: (Fort Bragg, March 2017)
On a daily basis the City currently produces about 50 gallons/resident and 78 gallons/1,000 square-feet
(SF) of commercial/industrial space of treated water. Residential development within the Inland Area
through 2022 is anticipated to include 63 new residential units (156 new residents), which would require
7,800 additional gallons of water per day, and 52,000 SF of new commercial/industrial development,
which will require 4,000 gallons of water per day. In total, all new development proposed for the Inland
Area will result in 12,000 additional gallons of demand, a 1.9% overall increase in water demand. The
City currently has sufficient water supply and storage to meet an 8% increase in water demand and
could accommodate the additional growth in the Inland Area without developing additional water
storage. Additionally, since the completion of the Summers Lane Reservoir with approximately 45 AF of
water storage capacity, the City can accommodate approximately a 20% growth in water demand. All
new development is required to pay its fair share of the water system infrastructure and future capital
improvements through the Water Capacity Charge. (Fort Bragg, 2012c)
3.7.5 INFRASTRUCTURE NEEDS OR DEFICIENCIES
The aging infrastructure of the water system and the reliability of the water collection conduits are the
primary factors influencing the City’s ability to provide water services to customers. The improvement
projects identified in the City’s 1986 Water System Study and Master Plan have been addressed. The
City plans for capital projects through the rolling five-year Capital Improvement Program (CIP) as part of
the annual budget development process. Refer to Figure 2-6 for a list of water system projects identified
in the Fiscal Year 2018-2022 CIP.
3.8 WASTEWATER ENTERPRISE
3.8.1 SERVICE OVERVIEW
The public wastewater treatment system includes collection, treatment, and discharge facilities. The
wastewater system serving the City is owned by the Fort Bragg Municipal Improvement District
Chapter 3 – Municipal Service Review Page 3-12
MSR/SOI Update | City of Fort Bragg
(MID/District) No. 1 and is operated and maintained by the City at the expense of the District. The
District boundary is larger than the City boundary.
The Fort Bragg MID No. 1 (District) was formed to acquire and construct wastewater system
improvements including a wastewater treatment plant and to provide for the incurring of indebtedness
for the costs and expansion of such improvements. Any territory annexed to the MID is subject to all the
liabilities, including previously authorized taxes, benefit assessments, fees or charges for services, and is
entitled to all benefits of the District. (LAFCo, 2008)
The Wastewater Treatment Plant (WWTP) is located at 101 West Cypress Street in Fort Bragg. The
WWTP operates under Waste Discharge Requirements pursuant to Order No. R1‐2015‐0024, NPDES No.
CA0023078, and WDID No. 1B84083OMEN issued by the North Coast Regional Water Quality Control
Board on June 4, 2009 (Fort Bragg, March 2017). The MID serves approximately 2,450 residential
wastewater connections, 350 commercial dischargers, and one industrial customer within the District,
and serves MacKerricher State Park located outside the District (Fort Bragg, July 2017).
3.8.2 STAFFING
All MID operations and maintenance are performed by City staff. The City has two Lead Treatment
Operators, five level II Treatment Plant Operators, including one Electrician, that together operate and
maintain the water treatment system and the wastewater treatment system. For the wastewater
system, City staff is responsible for operating and maintaining the treatment plant, wastewater
collection system, six lift stations, and discharge in compliance with State and Federal water quality
standards (LAFCo, 2008; Fort Bragg, July 2017).
3.8.3 CAPACITY OF FACILITIES
The MID wastewater system is comprised of over 25 miles of gravity-fed pipelines and pressure force
mains, six sewage lift stations, the WWTP, and an ocean outfall pipeline that extends 690 feet into the
Pacific Ocean. The WWTP was completed in 1971 and has a secondary treatment level capacity of 1.0
million gallons per day (MGD) for average dry weather flow (ADWF) and 2.2 MGD for average wet
weather flow (AWWF). (LAFCo, 2008)
Over the past five years, the North Coast Regional Water Quality Control Board has issued two
settlement agreements for Administrative Civil Liability (ACL) to the District, both were satisfactorily
addressed. The most recent ACL (R1-2016-0049) consists of two compliance projects to satisfy the
minimum mandatory penalties. These exceedances include biochemical oxygen demand (BOD), total
suspended solids (TSS), Total Coliform and Total Chlorine Residual. The compliance projects involve
installation of an influent flow meter and installation of sodium hypochlorite and sodium bisulfite
analyzers. The previous ACL (R1-2014-0035) included a compliance project to complete the design phase
of the WWTP Upgrade Project in order to improve BOD and TSS effluent discharge. These compliance
projects have been completed, with the exception of the influent flow meter which is scheduled for
installation in September, and satisfactorily addressed the RWQCB concerns. (Fort Bragg, March 2017;
Fort Bragg, July 2017)
Currently, the WWTP wet weather treatment capacity is exceeded several times a year due to very high
flows of stormwater and groundwater into the wastewater collection system caused by infiltration and
inflow (I/I) and cross-connection between storm drains and sewer lines. I/I is problematic for multiple
Chapter 3 – Municipal Service Review Page 3-13
MSR/SOI Update | City of Fort Bragg
reasons but especially because of the potential for sanitary sewer overflows (SSOs) and penalties for
exceeding effluent limitations when the WWTP cannot operate as designed.
The District, via City staff, is working to eliminate cross-connections and mitigate I/I in the wastewater
collection system by implementing improvement projects identified in the 2009 Final Wastewater
Collection Facilities Management Plan Report prepared by AECOM and by following the 2010 Sewer
System Management Plan. In addition, City staff addresses areas with high rates of I/I by implementing
slip lining pipe repairs, conducting video inspections and smoke testing of the collection system to
identify needed repairs, and making visual inspections during high flows to identify major sources of I/I.
Until major capital improvements are made to address I/I problems, the wet weather treatment
capacity will continue to be a limiting factor for the wastewater system. (Fort Bragg, 2012c)
3.8.4 DEMAND FOR SERVICES
In 2016, the District’s average daily flow volume was 0.842 MGD, which is within the design capacity of
the WWTP, and the peak flow volume was 4.075 MGD due to wet weather events, which is above the
design capacity of the WWTP (Fort Bragg, March 2017).
The 2013 Predesign Study for Fort Bragg WWTP Upgrade Project prepared by Nolte Associates, Inc.,
identified upgrade, renovation, and system redundancy projects to improve the long-term performance
of the WWTP facility based on future conditions including considerations for City growth and increases
in nutrient loading from the North Coast Brewing Company (NCBC), since it is a major industrial
discharger to the WWTP. The Predesign Study also provided a characterization of historical wastewater
flows as shown in Figure 3-1 below.
Figure 3-1 Historical Wastewater Flow Data 2009-2012
Source: (Nolte Associates, 2013)
Chapter 3 – Municipal Service Review Page 3-14
MSR/SOI Update | City of Fort Bragg
The following table shows updated wastewater flow data for the City between 2013 and 2016.
Table 3.8 City of Fort Bragg Wastewater Flow Data 2013-2016
Parameter Unit 2013 2014 2015 2016 Average
ADF MGD 0.649 0.716 0.595 0.842 0.701
ADWF MGD 0.610 0.624 0.490 0.502 0.557
AWWF MDG 0.669 0.762 0.648 1.010 0.772
MDF MDG 1.247 2.565 2.717 4.075 2.651
MMF MG 27.13 41.45 30.07 51.34 37.50
Source: (Fort Bragg, July 2017)
The Predesign Study estimates a 10% increase in flow (an average daily flow volume of 0.0842 MGD) for
future residential and general commercial/industrial growth within the City for the next 10 years. The
Predesign Study also estimates a 40% increase in NCBC discharge related to a projected expansion of
annual brewing operations from 50,000 to 85,000 barrels. These growth parameters provide the basis
for the Predesign Study recommended design criteria to size the WWTP process equipment for the
WWTP Upgrade Project. The District does not anticipate a significant increase in demand for wastewater
service within the District boundary nor does the District expect inclusion of any new customers outside
their boundary within the next five years. The existing capacity of the WWTP is sufficient to meet the
wastewater service demands within the timeframe of this MSR.
Over the 40-year life span of the WWTP, the facility has undergone various expansions and upgrades.
However, most equipment and unit processes have reached their useful service life. The project will
upgrade the facility to current technology and energy standards, maintain the current permitted
average dry weather flow capacity of 1.0 MGD, and achieve wastewater treatment objectives for
discharge. The major project elements include replacing the existing trickling filters with an activated
sludge system, constructing a dewatering building, new sludge holding area, splitter box, and pump
station to allow for peak flow pumping capacity, installing a biological treatment facility, repurposing the
existing primary and secondary clarifiers to emergency/surge storage basins, abandoning storm drain
outfalls as stormwater will be treated by the new facility, and grading and asphalt paving for interior site
access and modified catchment basins. (Fort Bragg, October 2016)
Construction for the WWTP Upgrade Project is identified as a Fiscal Year 2017-2018 Capital Project and
will be implemented once funding is secured. The City has completed the environmental review and
permitting process and the plans and specification have been prepared for this project. The City is in the
process of obtaining $11 million in grant funding and loans to construct this project in 2018. With this
major improvement project, the District will be able to meet long-term projected wastewater service
demands. All new development is required to pay its fair share of the wastewater system infrastructure
and future capital improvements through the payment of a Sewer Capacity Charge. (Fort Bragg, July
2017)
3.8.5 INFRASTRUCTURE NEEDS OR DEFICIENCIES
The aging infrastructure of the wastewater system and the peak flow volume during wet weather events
are the primary factors influencing the District’s ability to provide wastewater services to customers.
The City, on behalf of the District, plans for capital projects through the rolling five-year Capital
Chapter 3 – Municipal Service Review Page 3-15
MSR/SOI Update | City of Fort Bragg
Improvement Program (CIP) as part of the annual budget development process. Refer to Figure 2-6 for a
list of wastewater system projects identified in the Fiscal Year 2018-2022 CIP.
3.9 SERVICES PROVIDED BY CONTRACT OR JPA
This section includes information regarding City services provided by contract or Joint Powers Authority
(JPA).
3.9.1 C.V STARR COMMUNITY CENTER
The C.V. Starr Community Center and Sigrid & Harry Spath Aquatic Facility (C.V. Starr Center) was built
by the Mendocino Coast Recreation and Park District (MCRPD), a special district providing recreation
services to residents of the Mendocino Coast. The C.V. Starr Center is a 43,000 square foot recreation
and aquatic facility with an indoor water park including an eight-lane competition pool and diving board,
a leisure pool with a water-slide, and a lazy river, a cardio-fitness center and weight room, and facilities
for other fitness classes and enrichment activities. In addition, the facility has meeting rooms for parties
and community events, and the grounds include a dog park, a skateboard park, petanque courts, and
picnic and BBQ facilities.
After opening the facility in August 2009, MCRPD was challenged with insufficient operating revenues. In
March 2012, the voters of Fort Bragg approved a half-cent special sales tax (Measure A) to provide
funding for operation, maintenance, and capital improvements at the facility. The measure also required
that ownership of the C.V. Starr Center be transferred to the City and that MCRPD assign a portion of its
property tax revenues to the City. The facility reopened under City ownership in July 2012 and MCRPD
now operates the facility under contract with the City and the City provides financial and operational
oversight.
3.9.2 FIRE PROTECTION
The City of Fort Bragg and the Fort Bragg Rural Fire Protection District jointly provide fire services within
their respective boundaries under a JPA known as the Fort Bragg Fire Protection Authority (FBFPA). The
JPA was formed in fiscal year 1989-1990 and is a public entity that is separate and apart from both the
City and the Fire District. FBFPA has all of the powers relating to fire protection, fire suppression, and
emergency rescue authorized by law and has the power to contract for the purchase, lease, or rental of
whatever services or equipment that it may consider appropriate for its mission. Debts, liabilities, or
other obligations of FBFPA do not accrue to the two agencies that entered into the JPA.
The FBFPA’s budget is approved by the FBFPA Board of Directors, the City Council, and the Fire District
Board. Funding responsibility is shared by the City and the Fire District with the breakdown of operating
costs based on a three-year average call ratio. Typically, the City averages a higher percentage of the
calls and therefore pays a higher percentage of FBFPA’s budget.
The FBFPA paid staff consists of a Fire Chief, Fire Prevention Officer, Maintenance Engineer, and an
Officer Manager. FBFPA also has 35 volunteer firefighters who are considered employees. Neither the
City nor the Fire District has employees with the job responsibility of providing fire protection services.
For more information related to FBFPA, please refer to the 2011 Fort Bragg Rural Fire Protection District
Municipal Service Review.
Chapter 3 – Municipal Service Review Page 3-16
MSR/SOI Update | City of Fort Bragg
3.9.3 SUCCESSOR AGENCY TO FORT BRAGG REDEVELOPMENT AGENCY
Between 1986 and 2012, the Fort Bragg Redevelopment Agency carried out redevelopment projects and
promoted and supported economic development and affordable housing development within a portion
of the City including properties within the Central Business District, commercial and industrial lands
along Main Street, and the former Georgia Pacific mill site. In early 2012, the Redevelopment Agency
was dissolved as a result of ABx126 and the City Council elected to serve as the Successor Agency to the
Fort Bragg Redevelopment Agency. The Successor Agency is the legal entity tasked with winding down
the affairs of the former Redevelopment Agency under the supervision of an Oversight Board. The
Successor Agency plays a key role in assuring that the existing debt service and other enforceable
obligations of the former Redevelopment Agency are properly paid based upon a Recognized Obligation
Payment Schedule (ROPS) approved by the Oversight Board and the State Department of Finance.
3.10 MSR DETERMINATIONS
3.10.1 Growth and Population Projections
1. The existing population of the City is estimated to be 7,287 and the existing population of the
District is estimated to be 7,410. The annual growth rate for the City of Fort Bragg is 0.2%. The
City, District, and surrounding areas are expected to experience minimal change in population
size over the next 5-10 years.
2. The City of Fort Bragg has a full range of land uses including low to high density residential, retail
and service commercial, manufacturing, public facilities, recreation, and open space. Land uses
within the City are established by the City’s Inland and Coastal General Plan Land Use Elements
and implemented by the City’s Inland and Coastal Land Use and Development Codes.
3. The Spheres of Influence for the City and the District include unincorporated areas currently
under the land use authority of Mendocino County, which are regulated by the County General
Plan and Zoning Ordinance.
4. The City and the District have confirmed the adequacy of their existing boundary and SOI. The
existing boundary and SOI for the City and the District are appropriate and no amendments are
anticipated within the next five years.
3.10.2 The location and characteristics of any disadvantaged unincorporated communities
within or contiguous to the sphere of influence
5. The median household income for Fort Bragg is $33,867, which is 52% of the statewide median
household income. The City of Fort Bragg is considered to be a disadvantaged community, and
may have adjacent Disadvantaged Unincorporated Communities (DUCs). Should future
annexations to the City and District be proposed, consideration will be given to any DUCs
affected by the annexation.
3.10.3 Present and Planned Capacity of Public Facilities and Adequacy of Public Services
6. The City has 2,275 acre-feet, or 741.312 million gallons, of water appropriations from the Noyo
River, Newman Gulch, and Waterfall Gulch water sources. The City’s annual water demand is
approximately 767 acre-feet or 250 million gallons of drinking water. During Fiscal Year 2016-
2017, the City completed the Summers Lane Reservoir Project, providing an additional 15 million
gallons of raw water storage to help ensure a reliable water supply during severe drought years
and for future development.
Chapter 3 – Municipal Service Review Page 3-17
MSR/SOI Update | City of Fort Bragg
7. It is recommended that the City update the 1986 Water System Master Plan to perform an
updated assessment of the adequacy of its water system infrastructure and storage facilities;
continue efforts to secure additional water sources; take the necessary actions to convert the
City’s Noyo River Diversion Permit to a permanent license; continue to implement projects to
improve the pressure in the water system lines to improve service reliability and provide
adequate fire flow in the case of an emergency; and evaluate the feasibility of producing
reclaimed water at the Wastewater Treatment Plant.
8. The District’s Wastewater Treatment Plant (WWTP) has a secondary treatment level capacity of
1.0 million gallons per day (MGD) for average dry weather flow and 2.2 MGD for average wet
weather flow. In 2016, the District’s average daily flow volume was 0.842 MGD and the peak
flow volume was 4.075 MGD due to wet weather events. The existing capacity of the WWTP is
sufficient to meet the wastewater service demands within the planning horizon of this MSR.
9. A 2013 Predesign Study identified estimated growth parameters for the District and
recommended design criteria to size the WWTP process equipment for the WWTP Upgrade
Project which is estimated to cost $11,699,000. Construction for the WWTP Upgrade Project is
identified as a Fiscal Year 2017-2018 Capital Project and will be implemented once funding is
secured. With this major improvement project, the District will be able to meet long-term
projected wastewater service demands.
10. Infiltration and inflow (I/I) into the District’s wastewater collection system has been identified as
a significant problem. The City, on behalf of the District, is addressing areas with high rates of I/I
by implementing slip lining pipe repairs, conducting video inspections and smoke testing of the
collection system to identify needed repairs, and making visual inspections during high flows to
identify major sources of I/I. Until major capital improvements are made to address I/I
problems, the wet weather treatment capacity will continue to be a limiting factor for the
wastewater system.
11. As part of the rezoning process for the Georgia Pacific Mill Site, it is recommended that the City
assess the capacity of the water and wastewater systems to accommodate new development.
The City could also include new policies in the Coastal General Plan that require proof of service
prior to approval of any permits for new or more intensive development within the Mill Site.
12. Traffic projections, based on the Inland Land Use Element 10-year buildout projections (2022),
indicate that the future level of service will remain virtually identical to current conditions.
Further, traffic projections for all potential future development throughout the City, including
anticipated development on the Georgia Pacific Mill Site, indicate that all intersections and
roadway segments will conform to the standards established by the City’s Circulation Element.
3.10.4 Financial Ability of Agency to Provide Services
13. Based on financial audit information from Fiscal Years 2013-14, 2014-15, and 2015-16, the City
generally operates at a net income and is able to meet its ongoing financial obligations.
14. Based on the projected FY 2017-18 City budget, the General Fund is generally operating at a
loss. The projected decline in fund balance for the General Fund is primarily due to the
implementation of a new cost allocation plan beginning in FY 2016-17, repayment to the Water
and Wastewater Enterprise Funds for prior year over-payment based on the old cost allocation
plan, and increasing expense costs outpacing slow revenue growth. To stabilize the General
Fund deficit and rebuild emergency reserves, the City will need to continue to budget
conservatively, closely manage operating expenditures, and enhance revenue sources where
Chapter 3 – Municipal Service Review Page 3-18
MSR/SOI Update | City of Fort Bragg
possible. In addition, general Transient Occupancy Tax revenues are expected to increase by
5.5% in FY 2017-18 and this projected revenue gain will help to address the General Fund deficit.
15. The Water and Wastewater Enterprise Funds are fiscally healthy and on-going operating
revenues in these funds are projected to continue to keep pace with operating expenditures.
The Water and Wastewater Enterprise service rates went into effect on July 1, 2013. In FY 2016-
17, the City prepared updated rate studies to determine the appropriate timing for
implementing the rate increase schedule that was approved in 2013 and which was temporarily
suspended in FY 2016-17. The rate increase will be postponed until FY 2018-19.
16. The City’s Five-Year Capital Improvement Program (CIP), covering FY 2017-18 through FY 2021-
22, outlines current and future infrastructure needs and capital funding priorities for municipal
facilities, parks and community services, street maintenance and traffic safety, storm drains,
Water Enterprise, and Wastewater Enterprise on behalf of the District. The City identifies
funding sources and commits funding for specific capital projects as part of the annual budget
development process.
17. The City maintains appropriate staffing levels for each department based on anticipated
workloads and assignments, and maximizes the unique skill set of the labor force to address
unanticipated public needs when they arise.
18. While the City faces revenue constraints, there are no proposed reductions in City services. In
addition, the City continues to address high priority public facility and infrastructure needs
through grants, low interest loans, and special revenue funds.
3.10.5 Opportunities for Shared Facilities
19. Due to the isolated location of Fort Bragg, the services and facilities provided by the City and
District are critical to residents of the area. The City collaborates with other public agencies to
provide service more efficiently or effectively when possible. This includes collaboration on the
following municipal services: CV Starr Community Center operation, Coastal Trail operation, fire
protection services, police dispatch services, building inspection and permitting services, and
solid waste services.
20. There are no public agencies providing water or wastewater services near the City/District
boundary and so there are no opportunities for joint water or wastewater facilities.
21. There were no additional opportunities for the City to collaborate with other public service
providers to achieve management or operational efficiencies identified during the preparation
of this MSR.
3.10.6 Accountability for Community Services
22. The City is governed by a five-member City Council elected to serve a 4-year term. Regularly
scheduled City Council meetings are held on the second and fourth Mondays of every month
starting at 6:00 p.m. at Town Hall located at 363 N. Main Street in Fort Bragg. All meetings are
open to the public and are publicly posted a minimum of 72 hours prior to the meeting in
accordance with the Brown Act.
23. As a subsidiary of the City, the legislative body of MID No. 1 is the City Council. Public meetings
for the District are held concurrently with the City Council meetings.
24. The City offers multiple ways to keep citizens informed about workshops, hearings, projects, and
overall governance of the community. The public can submit written comments and complaints
online using the Request Tracker or by completing a customer satisfaction survey. The public
Chapter 3 – Municipal Service Review Page 3-19
MSR/SOI Update | City of Fort Bragg
may also provide verbal comments or complaints by phone or in person at City Hall during
business hours and/or at City Council meetings during the general public comment period.
3.10.7 Any Other Matters Related to Service Delivery as Required by LAFCo Policy
25. There are no other matters related to service delivery required by Mendocino LAFCo Policy.
Chapter 3 – Municipal Service Review Page 3-20
MSR/SOI Update | City of Fort Bragg
4 SPHERE OF INFLUENCE UPDATE
4.1 BACKGROUND
LAFCo prepares a Municipal Service Review (MSR) prior to or in conjunction with the Sphere of Influence
(SOI) Update process. The MSR and required determinations for the City of Fort Bragg is presented in
Chapter 3 of this document and forms the basis of information for the SOI Update. The SOI Update
considers whether a change to an agency’s sphere, or probable future boundary, is warranted to plan
the logical and orderly development of an agency in a manner that supports CKH Law and the policies of
the Commission. This chapter presents the SOI Update and required determinations pursuant to
California Government Code §56425(e) for the City of Fort Bragg and the Fort Bragg Municipal
Improvement District No. 1.
4.2 SPHERE OF INFLUENCE, OUT-OF-AREA SERVICES, AND
AREAS OF INTEREST
4.2.1 SPHERE OF INFLUENCE
The Sphere of Influence (SOI) for the City of Fort Bragg and the Fort Bragg Municipal Improvement
District (MID) No. 1 was last updated in August 2008 by LAFCo Resolution No. 2008-05. At that time, the
City’s SOI was reduced to more closely correspond with the spatial extent of the City’s water and the
District’s wastewater service areas. (Fort Bragg, 2012b)
The City is approximately 2.92 square miles in size and includes five island areas (non-contiguous land)
totaling 0.15 square miles in size and comprised of city-owned property that was annexed on April 7,
1997 by LAFCo Resolution No. L97-03. The District is approximately 2.98 square miles in size and the
District boundary generally follows the contiguous portion or core of the City limits (2.77 square miles),
excluding the island areas. The District serves land beyond the core of the City limits, encompassing
unincorporated areas of Mendocino County to the south of the City along Noyo Harbor and the
coastline and to the southeast of the City located north of Dolphin Cove. (LAFCo, 2008; Fort Bragg, July
2017)
The SOI boundary for the City and MID No. 1 is different because the boundary of each agency is
different. The City and MID No. 1 share a large portion of SOI area located east of the City limits and
containing 125 parcels. In addition, the City SOI includes an adjacent area located southeast of the City
limits containing 24 parcels which is connected to the City and District eastern SOI area. The City SOI
also includes an area located south of the City limits along Noyo Harbor containing 75 parcels. These two
additional City SOI areas are already encompassed by the District boundary. (Leif Farr, personal
communication, August 15, 2017)
The City’s Inland General Plan Land Use Element identifies the land east of the City limits, located within
the existing SOI for the City and MID No. 1, as designated for residential development and potentially
suitable for future annexation. The City’s Coastal General Plan Land Use Element identifies the land
south of the City limits, located within the City’s existing SOI and the MID No. 1 boundary, as potentially
suitable for future annexation and emphasizes the importance of maintaining coastal-dependent land
uses for the Noyo Harbor area such as commercial fishing, recreational boating, and related commercial
Chapter 4 – Sphere of Influence Update Page 4-1
MSR/SOI Update | City of Fort Bragg
uses, while increasing the range of visitor-serving uses on parcels located directly adjacent to the coast
and the Noyo River. The City’s Inland and Coastal General Plan Land Use Elements also establish policies
for SOI areas to ensure that expansion of the City occurs in an orderly fashion; that there are clear public
benefits achieved by expanding the municipal boundaries, development requiring annexation can be
adequately served by infrastructure, and that the costs associated with annexations are fairly allocated.
(Fort Bragg, 2008; Fort Bragg, 2012b)
There are two rural residential areas located south of the City limits that are within the District boundary
but are not included in the City SOI. One area is located west of State Highway 1 between the Pomo
Bluffs Park and Babcock Beach/Hare Creek and the second area is located east of State Highway 1 and
southeast of Noyo Harbor. This is the result of a long-standing arrangement to provide sewer and water
services to the Noyo Harbor area to support the business district. To address public health and safety
issues, sewer and water service is also provided to residential properties adjacent to the business district
with failed on-site septic and/or well systems. The City cannot provide the full range of urban services to
these residential areas; therefore, they were not included in the 2008 City SOI boundary. (Marie Jones,
personal communication, August 25, 2017)
Annexations into the City require concurrent annexation into MID No. 1. There have been no
annexations to the City or MID No. 1 since the 2008 MSR/SOI Update. The City and MID No. 1 have
confirmed the adequacy of their existing boundary and SOI. The existing boundary and SOI for the City
and MID No. 1 are appropriate and no amendments are anticipated within the next five years.
4.2.2 OUT-OF-AREA SERVICES
The City serves approximately 32 water customers located outside the City boundary. MID No. 1 serves
MacKerricher State Park located outside the District boundary. There has not been any new water or
wastewater connections established outside the City or District boundary since the 2008 MSR/SOI
Update. The City and MID No. 1 do not have any pending out-of-area service agreements. (Fort Bragg,
July 2017)
4.2.3 AREAS OF INTEREST
Due to the isolated location of Fort Bragg on the Northern California coast, there are few communities
located adjacent to the City. There are no incorporated cities located within 25 miles of Fort Bragg. The
unincorporated Village of Mendocino is the next largest and closest community to Fort Bragg and is
located ten miles south of the City on State Highway 1. There could potentially be communities with
similar residential and commercial land use densities adjacent to the SOI for the City or MID No. 1.
However, there are no currently identified unserved areas of urban density adjacent to the existing
boundary and SOI of the City or MID No. 1 that require City or District services within the next five years.
4.3 SOI DETERMINATIONS
It is recommended that the Commission affirm the existing SOI for the City of Fort Bragg and the Fort
Bragg Municipal Improvement District No. 1. The following statements have been prepared in support of
this recommendation.
Chapter 4 – Sphere of Influence Update Page 4-2
MSR/SOI Update | City of Fort Bragg
4.3.1 Present and planned land uses in the area, including agricultural and open space
lands
The City of Fort Bragg has a full range of land uses including low to high density residential, retail and
service commercial, manufacturing, public facilities, recreation, and open space. Land uses within the
City are established by the City’s Inland and Coastal General Plan Land Use Elements and implemented
by the City’s Inland and Coastal Land Use and Development Codes. The Spheres of Influence for the City
of Fort Bragg and the Fort Bragg Municipal Improvement District No. 1 are unincorporated areas
currently under the land use authority of Mendocino County and are regulated by the County General
Plan and Zoning Ordinance.
4.3.2 Present and probable need for public facilities and services in the area
The Sphere of Influence for the City of Fort Bragg includes territory that (a) is already receiving water
service from the City, (b) is already within the Fort Bragg Municipal Improvement District No. 1
boundary, or that (c) the City could extend services to within the next five years and has the greatest
future need for urban services. The Sphere of Influence for the Fort Bragg Municipal Improvement
District No. 1 includes territory that is within the City’s Sphere of Influence and that the District could
extend wastewater service to within the next five years. The properties that are presently receiving City
water service and/or District wastewater service will continue to need those public services.
The City does not have an Annexation Plan for the Noyo Harbor area. The City’s Coastal General Plan
Land Use Element includes policies and programs related to long-range land use and development of the
Noyo Harbor area. Program LU-8.1.1 encourages the preparation of a specific plan for the Noyo Harbor
with the cooperation and involvement of the Noyo Harbor District, the County of Mendocino, local
property owners, and appropriate State agencies. Program LU-6.1.1 encourages the City to work with
the County of Mendocino, the Noyo Harbor District, and other agencies to develop and adopt a Noyo
Harbor Plan establishing standards for conservation and development for the entire Noyo River drainage
area. It is recommended that the City, County, and Harbor District continue to collaborate in planning
for the future development of the Noyo Harbor area. It is also recommended that prior to the next
MSR/SOI Update, the City make progress towards implementing the above General Plan Programs.
4.3.3 Present capacity of public facilities and adequacy of public services that the agency
provides or is authorized to provide
As determined in the MSR prepared for the City of Fort Bragg and the Fort Bragg Municipal
Improvement District No. 1, the City and the District have adequate facilities, personnel, finances, and
equipment to meet current and future demands for public services within the next five years.
4.3.4 Existence of social or economic communities of interest in the area if the Commission
determines that they are relevant to the agency
There are two rural residential areas located south of the City limits that are within the District boundary
but are not included in the City SOI. One area is located west of State Highway 1 between the Pomo
Bluffs Park and Babcock Beach/Hare Creek and the second area is located east of State Highway 1 and
southeast of Noyo Harbor. These areas are not recommended to be added to the City SOI at this time;
however, the suitability of including these areas within the City SOI will be re-evaluated in the next
MSR/SOI Update.
Chapter 4 – Sphere of Influence Update Page 4-3
MSR/SOI Update | City of Fort Bragg
No other social or economic communities of interest have been identified in the immediate vicinity of
the City of Fort Bragg and the Fort Bragg Municipal Improvement District No. 1 that should be included
in the City or District boundary or Sphere of Influence.
4.3.5 Present and Probable need for Public Facilities and Services of Disadvantaged
Unincorporated Communities
The median household income for Fort Bragg is $33,867, which is 55% of the statewide median
household income. The City of Fort Bragg is considered to be a disadvantaged community, and may have
adjacent Disadvantaged Unincorporated Communities (DUCs). Should future annexations to the City and
Fort Bragg Municipal Improvement District No. 1 be proposed, special consideration will be given to any
DUCs affected by the annexation consistent with GC §56375(8)(A) and LAFCo Policy.
Chapter 4 – Sphere of Influence Update Page 4-4
MSR/SOI Update | City of Fort Bragg
5 REFERENCES
Fort Bragg, City of. July 24, 2017. City response to second Information Request from the Local Agency
Formation Commission of Mendocino County in preparation for the 2017 Municipal Service Review
and Sphere of Influence Update. Available at LAFCo’s office upon request.
Fort Bragg, City of. June 26, 2017. City of Fort Bragg, California Fiscal Year 2017-2018 Budget. [Online]
Available at: < https://city.fortbragg.com/DocumentCenter/Home/View/6540>. Accessed November
9, 2017.
Fort Bragg, City of. May 24, 2017. City of Fort Bragg Proposed Budget Fiscal Year 2017-2018. [Online]
Available at: <https://city.fortbragg.com/AgendaCenter/ViewFile/Agenda/_05242017-431>.
Accessed June 26, 2017.
Fort Bragg, City of. March 3, 2017. City response to first Information Request from the Local Agency
Formation Commission of Mendocino County in preparation for the 2017 Municipal Service Review
and Sphere of Influence Update. Available at LAFCo’s office upon request.
Fort Bragg, City of. January 2017. City of Fort Bragg, California Comprehensive Annual Financial Report
For the year ended June 30, 2016. Fort Bragg, CA.
Fort Bragg, City of. November 28, 2016. City Council Staff Report for the Corrective Action Plan to
Address Prior Year Cost Allocation Errors. [Online] Available at:
<https://cityfortbragg.legistar.com/View.ashx?M=F&ID=4804321&GUID=DECA371E-D3D3-4116-
9CC1-112A3B472BFE>. Accessed November 19, 2017.
Fort Bragg, City of. October 12, 2016. Planning Commission Staff Report for the WWTP Upgrade Project
Coastal Development Permit and Design Review Permit. [Online] Available at:
<https://cityfortbragg.legistar.com/View.ashx?M=F&ID=4716446&GUID=028F3CF1-E077-4BB3-
8C65-9C410B122A2B>. Accessed July 1, 2017.
Fort Bragg, City of. July 2016. City of Fort Bragg, California Fiscal Year 2016-2017 Budget. [Online]
Available at: <https://city.fortbragg.com/DocumentCenter/Home/View/5444>. Accessed June 21,
2017.
Fort Bragg, City of. January 2016. City of Fort Bragg, California Comprehensive Annual Financial Report
For the year ended June 30, 2015. Fort Bragg, CA.
Fort Bragg, City of. January 2015. City of Fort Bragg, California Comprehensive Annual Financial Report
For the year ended June 30, 2014. Fort Bragg, CA.
Fort Bragg, City of. 2014. City of Fort Bragg Inland General Plan Housing Element. [Online] Available at:
<https://city.fortbragg.com/156/Inland-General-Plan>. Accessed May 18, 2017.
Chapter 5 - References Page 5-1
MSR/SOI Update | City of Fort Bragg
Fort Bragg, City of. 2012a. City of Fort Bragg Inland General Plan Circulation Element. [Online] Available
at: <https://city.fortbragg.com/156/Inland-General-Plan>. Accessed May 18, 2017.
Fort Bragg, City of. 2012b. City of Fort Bragg Inland General Plan Land Use Element. [Online] Available
at: <https://city.fortbragg.com/156/Inland-General-Plan>. Accessed May 18, 2017.
Fort Bragg, City of. 2012c. City of Fort Bragg Inland General Plan Public Facilities Element. [Online]
Available at: <https://city.fortbragg.com/156/Inland-General-Plan>. Accessed May 18, 2017.
Fort Bragg, City of. 2008. City of Fort Bragg Coastal General Plan Land Use Element. [Online] Available at:
<https://city.fortbragg.com/284/Coastal-General-Plan>. Accessed May 18, 2017.
JJACPA, Inc. September 14, 2016. Independent Accountant’s Report on Applying Agreed-Upon
Procedures. [Online] Available at:
<https://cityfortbragg.legistar.com/View.ashx?M=F&ID=4804319&GUID=C9C62096-1118-4ABD-
9D50-5B3C26ACBE86>. Accessed November 19, 2017.
KASLConsulting Engineers. June 2011. City of Fort Bragg Alley Master Plan. 87-pages. Citrus Heights, CA.
LAFCo, Mendocino County. August 4, 2008. City of Fort Bragg Sphere of Influence Municipal Service
Review Report. 273-pages. [Online] Available at:
<http://mendolafco.org/msr/Fort%20Bragg%20MSR_2008.pdf>. Accessed May 30, 2017.
Nolte Associates, Inc. September 2013. Fort Bragg Municipal Improvement District No. 1 Predesign
Study for Fort Bragg Wastewater Treatment Plant Upgrade Project, Predesign Summary Report,
Volume One. 126-pages. Manteca, CA.
U.S. Census Bureau. July 1, 2016a. California QuickFacts. [Online]. Available at:
<https://www.census.gov/quickfacts/CA >. Accessed November 27, 2017.
U.S. Census Bureau. July 1, 2016b. City of Fort Bragg QuickFacts. [Online]. Available at:
<https://www.census.gov/quickfacts/fact/dashboard/fortbraggcitycalifornia>. Accessed July 3, 2017.
Chapter 5 - References Page 5-2
MSR/SOI Update | City of Fort Bragg
6 ACKNOWLEDGEMENTS
6.1 ASSISTANCE AND SUPPORT
This Municipal Service Review and Sphere of Influence Update could not have been completed without
the assistance and support from the following organizations and individuals.
Uma Hinman, Executive Officer
LAFCo Staff Larkyn Feiler, Analyst
Beth Salomone, Commission Clerk
City of Fort Bragg Linda Ruffing, City Manager
Marie Jones, Community Development Director
Chapter 6 - Acknowledgements Page 6-1