FINAL REPORT
COUNTY OF MERCED
WATER AND SEWER SERVICE PROVIDERS
MUNICIPAL SERVICE REVIEW
Prepared for:
Merced County Local Agency Formation Commission
Prepared by:
Economic & Planning Systems, Inc.
As Approved by LAFCO May 24, 2007
EPS #15029
B E R K E L E Y S A C R A M E N T O D E N V E R
2501 Ninth St., Suite 200 Phone: 510-841-9190 Phone: 916-649-8010 Phone: 303-623-3557
Berkeley, CA 94710-2515 Fax: 510-841-9208 Fax: 916-649-2070 Fax: 303-623-9049
www.epsys.com
Economic &
Planning Systems
Real Estate Economics
Regional Economics
Public Finance
Land Use Policy
Note: A version of this report titled “Draft” was approved by LAFCO on May 24, 2007. The
changes that have been made to this version are limited to updating the report’s title to “Final
Report” and including information discussed by the Commission at the hearing regarding the
Ballico Community Services District, Midway Community Services District, North Dos Palos
Water District, South Dos Palos County Water District, Volta Community Services District.
B E R K E L E Y S A C R A M E N T O D E N V E R
2501 Ninth St., Suite 200 Phone: 510-841-9190 Phone: 916-649-8010 Phone: 303-623-3557
Berkeley, CA 94710-2515 Fax: 510-841-9208 Fax: 916-649-2070 Fax: 303-623-9049
www.epsys.com
TABLE OF CONTENTS
I. INTRODUCTION..................................................................................................................1
Summary of Districts.......................................................................................................2
II. WATER AND WASTEWATER DISTRICTS.............................................................................8
Ballico Community Services District.............................................................................8
Celeste County Water District......................................................................................10
Country Club County Water District..........................................................................12
Delhi County Water District.........................................................................................14
Franklin County Water District....................................................................................18
Hilmar County Water District......................................................................................21
Le Grand Community Services District......................................................................26
Midway Community Services District........................................................................29
North Dos Palos Water District....................................................................................32
Planada Community Services District.........................................................................35
Santa Nella County Water District...............................................................................38
Snelling Community Services District.........................................................................48
South Dos Palos County Water District......................................................................51
Volta Community Services District..............................................................................54
Winton Water and Sanitary District............................................................................56
III. DETERMINATIONS............................................................................................................59
Explanation of Determinations.....................................................................................59
LIST OF TABLES AND FIGURES
Table 1: Summary of Water Service Providers.....................................................................3
Table 2: Summary of Wastewater Service Providers..........................................................4
Table 3: Average Monthly Water Service Rates for Typical
Single‐Family Homes...............................................................................................5
Table 4: Average Monthly Wastewater Service Rates for Typical
Single‐Family Homes...............................................................................................6
Figure 1: Ballico Community Services District......................................................................9
Figure 2: Celeste County Water District...............................................................................11
Figure 3: Country Club County Water District...................................................................13
Figure 4: Delhi County Water District..................................................................................15
Figure 5: Franklin County Water District............................................................................19
Figure 6: Hilmar County Water District...............................................................................22
Figure 7: Le Grand Community Services District...............................................................27
Figure 8: Midway Community Services District.................................................................30
Figure 9: North Dos Palos Water District.............................................................................33
Figure 10: Planada Community Services District.................................................................36
Figure 11: Santa Nella County Water District.......................................................................39
Figure 12: Snelling Community Services District.................................................................49
Figure 13: South Dos Palos County Water District...............................................................52
Figure 14: Volta Community Services District......................................................................55
Figure 15: Winton Water and Sanitary District.....................................................................57
I. INTRODUCTION
In 1997, the State Legislature convened a special commission to study and make
recommendations to address California’s rapidly accelerating growth. The Commission
on Local Governance for the 21st Century focused energies on ways to empower the
already existing County Local Agency Formation Commissions (LAFCOs). The
Commission’s final report, Growth within Bounds, recommended various changes to local
land use laws and LAFCO statutes. The Commission’s recommendations were
encompassed in Assembly Bill 2838 (2000), which amended the Cortese‐Knox‐Hertzberg
Local Government Reorganization Act of 2000 (“Reorganization Act”).
One of LAFCO’s new responsibilities requires regional studies of municipal services
(Municipal Service Reviews, or MSRs) every five years, in conjunction with reviews of
city and district spheres of influence (SOIs). Government Code Section 56425 directs
LAFCOs to review and update agencies’ SOIs, as necessary, every five years. Section
56430 requires MSRs to be conducted before or in conjunction with the sphere updates.
MSRs must address at least the following nine factors:
1. Infrastructure needs or deficiencies
2. Growth and population projections for the affected area
3. Financing constraints and opportunities
4. Cost avoidance opportunities
5. Opportunities for rate restructuring
6. Opportunities for shared facilities
7. Government structure options, including advantages and disadvantages or
consolidation or reorganization of service providers
8. Evaluation of management efficiencies
9. Local accountability and governance
Merced LAFCO retained Economic & Planning Systems, Inc. (EPS) to develop the MSRs
for water and sewer service providers in Merced County. Each provider was contacted
to request information and documents such as master plans, budgets, and maps. EPS
used the information obtained from the jurisdictions to write provider profiles and the
nine determinations required by law for each provider. The profiles and determinations
were submitted to each service provider for its review. The districts’ comments were
incorporated into the report.
In six cases, EPS was unable to contact a representative of the district or obtain
information about the district. As a result, in order to complete the MSR for those
entities, EPS relied on information from Sphere Reports which were adopted by LAFCO
when the spheres of influence of those districts were established and any subsequent
sphere amendments. It is recommended that LAFCO continue its efforts to update those
service reviews as certain districts no longer providing adequate services would
1
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
be candidates for dissolution or consolidation with a larger service provider. In
accordance with state law, those entities will not be allowed to obtain LAFCO approval
for various actions unless or until their MSRs are completed.
SUMMARY OF DISTRICTS
GOVERNANCE AND OPERATIONS
Merced County has a total of fifteen independent water and/or sewer districts, each of
which is governed by its own Board of Directors. Of the fifteen districts, eight provide
both water and wastewater services, two provide wastewater services only, four provide
water services only, and one exists only to pay back a general obligation bond and
provides no services.
District service areas and population, connections, and capacity are summarized in
Tables 1 and 2. As shown, the districts vary widely in size and service population, with
the total number of connections among responding districts ranging from 115 to nearly
3,000. With the exception of the Celeste County Water District, districts receive the
majority of their operations funding from water and/or wastewater service fees. As
shown in Table 3, water rates are typically charged on a tiered basis, with a flat base rate
charged for water usage up to a certain level and additional per‐gallon fees for water
usage above that level. In most cases, wastewater service customers pay only a monthly
flat fee (see Table 4).
INFRASTRUCTURE, FACILITIES, AND SERVICES
Almost all of the districts that provide water services rely exclusively on groundwater
wells for their water supply. The exception is Santa Nella Community Services District
(SNCSD). SNCSD purchases the majority of its raw water supply from the San Luis
Water District, which diverts surface water from the Delta Mendota Canal and the San
Luis Canal under a contract with the U.S. Bureau of Reclamation.
With the exception of Winton Water and Sanitary District (WWSD) and Midway
Community Services District (MCSD), all districts that provide wastewater services
operate their own wastewater treatment plants. WWSD collects wastewater and
transports it to the Atwater Wastewater Treatment Plant for treatment and MCSD’s
waste is treated by the City of Dos Palos’ treatment plant.
District staff report that existing facilities are adequate to meet current demand.
Generally, however, the districts have limited water and wastewater capacity to serve
future growth.
2
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Table 1
Summary of Water Service Providers
Merced County LAFCO Municipal Service Reviews; EPS #15029
Name Area Population Number of Production Usage
Served Served Connections Capacity (annual or daily)
Ballico Community Services District* 143 acres* 176* 50 dwellings* N/A N/A
Celeste County Water District (1) N/A N/A N/A N/A N/A
Country Club County Water District* 10.4 acres - south of Fowler N/A N/A N/A N/A
Avenue and 850 feet west
of Golf Link Road in the
Hilmar area
Delhi County Water District* N/A N/A 2,197 (2) 7.4 mgd N/A
Hilmar County Water District 1,000 acres - Hilmar 5,000 1,500 2.3 mgd 1.7 mgd; usage peaks
at 2.3 mgd during the
summer
Le Grand Community Services District (2) 384 acres - Le Grand 1,760 485 1.8 mgd 0.30 mgd (yearly
average)
Midway Community Services District* 684 acres- Midway* N/A 186 customers* N/A N/A
North Dos Palos Water District* 143 acres - north of City of 100* 41* N/A N/A
Dos Palos*
Planada Community Services District 924 acres - Planada and a 5,500 1,227 4.32 mgd 1.1 mgd; 400 million
small number of locations gallons per year
outside the District
Santa Nella County Water District 2,446 acres - Santa Nella 1,200 497 1.8 mgd N/A
South Dos Palos County Water District* 285 acres - South Dos N/A 220 N/A N/A
Palos
Volta Community Services District* 12 square blocks - Volta 100 30 N/A N/A
Winton Water and Sanitary District Winton area 8,832 2,982 6.05 mgd 1.56 mgd
(1) Celeste County Water District exists in order to pay off a bond and does not provide water services.
(2) Residential equivalent units served.
(3) There is no storage in the water supply system, so the wells must be able to meet peak domestic demand and fire flow simultaneously. As a result,
direct comparison of the well capacity with average daily demand is misleading.
* District's information obtained from Sphere of Influence Reports and Executive Officer Reports issued between 1982 and 1995.
"gpm" = gallons per minute
"mgd" = million gallons per day
"gpd" = gallons per day
Economic & Planning Systems, Inc. 4/18/2007 P:\15000s\15029mercedlafco\Data\WaterSewerRates
3
Table 2
Summary of Wastewater Service Providers
Merced County LAFCO Municipal Service Reviews; EPS #15029
Name Area Population Operating Wastewater Capacity
Served Served Budget Connections Flow
Celeste County Water District (1) N/A N/A N/A N/A N/A N/A
Delhi County Water District* N/A N/A N/A 2,048 .56 mgd 0.80 mgd
Franklin County Water District The district's service area 4,000 $910,100 651 .371 mgd 0.60 mgd
stretches north to Santa Fe
Drive, east to El Capitan
Canal, west to Franklin with
two developments west of
Franklin, and South to Ashby
R d
Hilmar County Water District 1000 acres 5,000 $910,612 1,490 0.45 mgd .55 mgd
Le Grand Community Services District 384 acres - Le Grand 1,760 $162,753 485 1.54 mgd 0.35 mgd
Midway Community Services District* 684 acres - Midway* N/A N/A N/A N/A .09 mgd*
Planada Community Services District 924 acres - serves Planada 5,500 $445,985 1,411 0.50 mgd 0.53 mgd
and a small number of
locations outside the district
Santa Nella County Water District 2,446 acres - Santa Nella 1,200 $638,000 497 0.30 mgd 0.40 mgd
Snelling Community Services District 480 acres - centered on 200 $69,300 115 0.03 mgd 0.06 mgd (2)
community of Snelling
South Dos Palos County Water District* 285 acres - South Dos Palos* N/A N/A 218* .035 mgd* 0.08 mgd*
Winton Water and Sanitary District Winton area 8,832 $598,073 2,969 0.71 mgd 1.0 mgd
(1) Celeste County Water District exists in order to pay off a bond and does not provide wastewater services.
(2) The Snelling Community Services District has established a policy that it will not exceed 75% of its maximum capacity (45,000 gpd).
* District's information obtained from Sphere of Influence Reports and Executive Officer Reports issued between 1982 and 1995.
"mgd" = million gallons per day
"gpd" = gallons per day
"ESD" = Equivalent Single Family Dwelling
Economic & Planning Systems, Inc. 4/18/2007 P:\15000s\15029mercedlafco\Data\WaterSewerRates
4
Table 3
Average Monthly Water Service Rates for Typical Single-Family Homes
Merced County LAFCO Municipal Service Reviews; EPS #15029
Monthly Charges
Water Service Provider
Base Rate Commodity Charge
Ballico Community Services District* No information available
Celeste County Water District (1) N/A N/A
Country Club County Water District* No information available
5150 gpm
Delhi County Water District* No information available
Hilmar County Water District $18.50 for the first 30,000 gallons $1 per gallon from 30,000 to 40,000
gallons, $2 per 1,000 gallons thereafter
Le Grand Community Services District Flat charge of $33.00 per month --
Midway Community Services District* No information available
North Dos Palos Water District* No information available
Planada Community Services District $33.00 for 3/4 inch to 1 inch service $44 for 1.5 inch services, $70 for 2 inch
service
Santa Nella County Water District $2.07 per 100 cubic feet (2) --
South Dos Palos County Water District* No information available
Volta Community Services District* No information available
Winton Water and Sanitary District $10.95 for first 1,000 cf $12.15 for 1,001-2,000 cf; $13.50 for
2,001-3,000 cf (3)
(1) Celeste County Water District exists in order to pay off a bond and does not provide water services.
(2) Rate for domestic metered service.
(3) $15.00 for 3,001-4,000 cf; $1.00 per 100 cf for 10,001-30,000 cf; $2.00 per 100 cf for 30,001 and thereafter.
* Current water service rates were not provided.
Includes publicly-owned water providers only.
Economic & Planning Systems, Inc. 4/18/2007
5
P:\15000s\15029mercedlafco\Data\WaterSewerRates
Table 4
Average Monthly Wastewater Service Rates for Typical Single-Family Homes
Merced County LAFCO Municipal Service Reviews; EPS#15029
Typical Service Charges
Sewer Service Provider Annual Monthly
Celeste County Water District (1) N/A N/A
Country Club County Water District* No information available
Delhi County Water District* No information available
Franklin County Water District $228.00-$276.00 $19.00-$23.00
Hilmar County Water District $204 $17.00
Le Grand Community Services District $408 $34.00
Midway Community Services District* No information available
Planada Community Services District $336 $28.00
Santa Nella County Water District $120 $10.00
Snelling Community Services District $116 $9.69
South Dos Palos County Water District* No information available
Winton Water and Sanitary District $348 $29.00
(1) Celeste County Water District exists in order to pay off a bond and does not provide
wastewater services.
* Current sewer service rates were not provided.
Includes publicly-owned wastewater providers only.
Economic & Planning Systems, Inc. 4/18/2007 6 P:\15000s\15029mercedlafco\Data\WaterSewerRates
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
DEMAND AND CAPACITY
With rapid growth occurring throughout Merced County, several districts anticipate
significant future residential development within their service areas. The County has
completed or is in the process of completing community/specific plans for the Delhi,
Hilmar, Planada, and Santa Nella areas. Each of these plans projects population growth
of between 3 and 7 percent annually over the next 10 to 15 years. In addition, a number
of districts, including Franklin, Le Grand, and Winton, contain planned residential
development that is currently awaiting annexation approval. In all cases, future
development is contingent upon the construction of additional facilities, as outlined in
the individual district profiles. Most districts plan to pay for new facilities through
development fees, connection fees, and/or service agreements under which developers
are required to construct and dedicate wells, lift stations, and other needed facilities.
Snelling Community Services District staff report that growth in that district is
constrained to infill development due to geographic limitations on wastewater treatment
facility expansion.
7
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
II. WATER AND WASTEWATER DISTRICTS
BALLICO COMMUNITY SERVICES DISTRICT
The LAFCO Executive Officers Report regarding the Ballico Community Services
District Formation, which was issued in 1984, provides the only information available on
the Ballico Community Services District.
GOVERNANCE AND OPERATIONS
The Ballico Community Services District was formed in 1983 to provide the
community’s inhabitants with a public domestic water system. Prior to the District’s
formation, the ground water in the Ballico area was polluted with nitrates and DBCP.1
Proponents of formation intended for the District to improve water quality.2
At the time of formation, the district encompassed approximately 143 acres and
provided domestic water service to 176 people in 50 dwellings. It was bounded
approximately by Ballico Avenue and Santa Fe Drive on the West; Lombardy Avenue on
the north; a line one‐quarter mile east of and parallel to Broadway on the east; and
Stockman Avenue on the south. The boundaries of the Ballico Community Services
District are identified in Figure 1. It was proposed that the district’s governing body be
composed of a three‐ or five‐member board of directors and that maintenance of the
water system be funded by monthly user’s fees of $10 or more.3
1 Dibromochloropropane (DBCP).
2 Local Agency Formation Commission Executive Officer’s Report: Ballico Community Services District
Formation, June 1986.
3 Local Agency Formation Commission Executive Officer’s Report: Ballico Community Services District
Formation, June 1986.
8
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Ballico Community Services District
Sphere of Influence
LOMBARDY
Y D
H E
C C
S A R R
N TA
FE
P A
R
T M E GREGG
O
P
W
E
N
GROVE
PARK
BALLICO
Y
A
W
D
A
O
R
B
BRADBURY
O
EAST STOCKMAN C
LI
R A L
P E B
P T
E R
S A P O
N P
TA
F E E
W
N
BRADBURY BALLICO
Z NORTH
E
T
R EL CAPITAN NORTH
O
C
SOUTH
CRESSEY ²
EUCALYPTUS
LIVINGSTON
0 500 1,000 2,000 Feet
LAFCO RESOLUTION 1004 ON 01/26/1984
SEVLA
Figure 1
L
L
A
H
HARDING
LOMBARDY LOMBARDY
SECOND
MERCEDES
of Merced County
9
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
CELESTE COUNTY WATER DISTRICT
The Celeste County Water District (CCWD) was formed to pay for sewer and water
infrastructure on two residential streets located just north of the Yosemite Parkway
(State Route 140), east of the City of Merced. It currently exists only to fund payments
on a general obligation bond that was paid off in April 2007, which is ten years earlier
than its expected maturity date of 2017. All of the District’s services are provided by the
City. Before the bond was paid off funding came from a special tax, which was based on
assessed value and is set each year at a rate sufficient to pay bond debt for that year as
well as property taxes. CCWD has no Board of Directors and does not provide services
or bill customers. District finances are administered by the County Auditor’s Office.
The District also receives a share of property tax that goes into its General Fund.4 The
District’s boundaries are identified in Figure 2.
4 Interview with Ron Kinchloe, Merced County Auditor’s Office, 12 July 2005.
10
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Celeste Water District
Sphere of Influence
OLIVE
Y
B
B KI
CELESTE
140
CHILDS MERCED
²
GERARD
9 9 MISSION
EEFFOC
REWOT
Figure 2
IDA
NELLIE
Y
S
A
E
CELESTE
L
L
E
D
140
F
A
E
L
SOUTH BEAR CREEK BEAR CREEK
D
R
A
H
STRETCH C
R
O Y
B
B
BODIE
KI
D
R
A
H
C
Y R
E O L
L
A
H D
R
9 A
9 H C
R
O
0 245 490 980 Feet
of Merced County
LAFCO RESOLUTION 1066 ON 9/27/1984
11
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
COUNTRY CLUB COUNTY WATER DISTRICT
The LAFCO Executive Officers Report regarding the Formation of the Country Club
County Water District, which was issued in 1982, provides the only information
available on the Country Club Water District.
GOVERNANCE AND OPERATIONS
The County Club County Water District was formed in 1982 in order to provide
domestic water service at reduced costs. The property proposed to be included in the
District consisted of a 15‐lot residential subdivision on 10.4 acres of land. These
properties are located south of Fowler Avenue and 850 feet west of Golf Link Road in
the Hilmar area.5 The District’s boundaries are identified in Figure 3.
5 Local Agency Formation Commission Executive Officer’s Report: Formation of Country Club Water
District, August 1982.
12
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Figure 3 Country Club Water District
Sphere of Influence
FOWLER
Y
A
B
O
R
R
O
M
FAIRWAY
L
A
N
Country Club Water District A
FOWLER FOWLER
Country Club
JOHNSON
OSLO K
N
LI
F
1 6 5 O L
AUGUST G H
T
FI
F
TIFFANY RI
G
AMERICAN
FOURTH
D ²
L FIRST
E
FI HILMAR
N BLOSS
WI
ECHO
0 125 250 500 Feet
of Merced County LAFCO RESOLUTION 0352
13
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
DELHI COUNTY WATER DISTRICT
The Wastewater Collection System and Water Distribution System Study revised in
2004, the Delhi Community Plan issued in 2005 and the LAFCO Executive Officer’s
Report: Sphere of Influence Revision No. 4 issued in 1995 provide the only information
available on the Delhi County Water District (DCWD).
The Delhi County Water District water distribution and wastewater collection systems
were established in 1962. At this time, the bulk of the systems’ infrastructure was
constructed although additions and upgrades have been made to accommodate new and
growing areas. The District currently services approximately 2,060 customers.6
INFRASTRUCTURE, FACILITIES, AND SERVICES
Water
In September 2004, the water system included water mains and four wells. It was
anticipated that an additional well would be installed within the next month.7
According to the May 2005 Delhi Community Plan, existing water mains and wells are
adequate to meet current demands and fire flows.8 Figure 4 identifies the current
boundaries of the District.
Wastewater
DCWD uses gravity collection supported by lift stations to convey sewage to its
wastewater treatment plant, located southeast of the Delhi Community Plan Area. It has
seven trunk lines and six lift stations. The system has capacity to process 0.8 mgd. It
currently processes 0.56 mgd. The May 2005 Delhi Community Plan Public Review
Draft states that existing facilities are adequate to meet current demand, but there are
ongoing problems with the operation of the plant requiring coordination with the
Regional Water Quality Control Board.9
DEMAND AND CAPACITY
Significant growth has occurred in Delhi in recent years and is expected to continue into
the future. According to the Updated Delhi Community Plan, adopted in July 2006,
growth projections for the Delhi area range from 3 percent to 7.5 percent annually
through 2020, depending on the source used. MCAG 2004 population projections
6 Wastewater Collection System and Water Distribution System Study for the Delhi County Water District,
September 2004, P. 8.
7 Wastewater Collection System and Water Distribution System Study, revised September 2004, P. 8.
8 Delhi Community Plan Public Review Draft, May 2005, 8‐1.
9 Delhi Community Plan Public Review Draft, May 2005, 8‐1.
14
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Delhi County Water District
Figure 4
Sphere of Influence
BRADBURY RD
D
R
T
N
E E
V C
A N
D VI
E
C
R
E
M
LETTEAU
AVE
S
T
E
P
H
E
N
S
S
T
DELHI COUNTY WATER DISTRICT
SCHENDEL RD SCHENDEL AVE
D E
R V
N K S O N
A
H A N T
S HI
AUGUST RD
9
9
D
R
R
E
LI
OL
DELHI C
BLOSS AVE
9
9
²
0 0.25 0.5 1Miles
of Merced County
LAFCO RES. NO. 1057E 04-25-96
15
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
estimate that Delhi will grow from 8,022 people in 2000 to 17,500 in 2020 (average
annual growth of 4.0 percent) and to 21,300 by 2030 (average annual growth of 3.3
percent).10
Future water distribution and wastewater collection needs are assessed based on the
flow levels projected when the area is at build out. The District is considered to be at
build out when the empty lots within the developed portion of the planning area are
filled. Depending on the population growth rate assumed, build out of this area is
expected to occur between 2020 and 2025.11
Water
In 2003, the DCWD provided water service connections to 2,197 residential equivalent
housing units and three of the area’s schools. The peak hour flow per residential unit
was evaluated and found to be 1.43 gpm based on 2003 data. Based on expected growth
in the area and future increases in school enrollment, future peak hour demand is
projected to increase to 11,322 gpm. Existing well capacity was 5,150 gpm. Based on the
projected future peak hour demand of 11,322 gpm, pumping capacity must be expanded
by 6,172 gpm in order to accommodate anticipated growth within the District.12
The Community Plan details the additional facilities that will be necessary to meet
projected demand at build out population of approximately 21,000. Anticipated water
facility requirements include additional wells connected to a system of 12‐inch pipes,
located primarily in the northern section of the Delhi Community Plan Area. An
additional well may be constructed in the southeast section of the Plan Area; however,
past groundwater test results in this section have not met California Title 22 (water
quality monitoring) regulations, and further studies and well tests will be necessary to
determine suitable sites.13
Wastewater
In 2003, the DCWD provided wastewater service to 2,048 connections. A total of 2,263
units received wastewater service. 14 This is equivalent to 2,168 single family residential
(SFR) units.15 Average daily flow, not including the flow generated by local schools,
10 Merced County Population Forecast 2000‐2030. March 2004.
11 Wastewater Collection System and Water Distribution System Study for the Delhi County Water District,
revised September 2004, P. 8.
12 Wastewater Collection System and Water Distribution System Study for the Delhi County Water District,
revised September 2004, Appendix C.
13 Delhi Community Plan Public Review Draft, May 2005, 8‐1.
14 There are fewer connections than units served, because one connection may serve multiple apartment or
mobile home units.
15 This assumes that one apartment unit equals two thirds of an equivalent residential connection, one
mobile home unit equals two thirds of an equivalent residential connection, and one mobile care unit equals
one third of an equivalent residential connection.
16
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
was approximately 560,000 gpd. Based on this number of SFR units within the District,
the average wastewater flow rate per SFR connection was calculated to be
approximately 258 gpd.16
It is estimated that existing plus projected demand will require a wastewater treatment
plant capable of processing 2.0 mgd. Projected demand includes that of local schools at
build out as well as developed empty lots within the developed portion of the planning
area.17 The current plant has a capacity of 0.8 mgd and acreage available to expand its
capacity to 1.2 mgd. In order to accommodate future growth a new wastewater
treatment plant or a change in technology and a physical expansion of the plant at its
present site may be necessary.18
New and upgraded wastewater facilities will also be required in order to deal with
projected growth. Existing sewer trunk lines, force mains, lift stations, and the District’s
wastewater treatment plant will need to be upgraded. Specific improvements described
in the Delhi Community Plan include lift station upgrades that will increase the
pumping capacity of stations 1, 4, and 5. In addition, the Community Plan projects that
DCWD will need to construct three new lift stations (one east of Flower Street and north
of Letteau Avenue, one in the vicinity of Vincent Road and North Avenue, and one in
the vicinity of August Road and Corner Street); four new trunk lines (north of Letteau
Avenue, north of North Avenue, near the intersection of North Avenue and Vincent
Road, and east of Highway 99 and north of 2nd Avenue); and a new force main.19
16 Wastewater Collection System and Water Distribution System Study for the Delhi County Water District,
revised September 2004, Appendix A.
17 Wastewater Collection System and Water Distribution System Study for the Delhi County Water District,
revised September 2004, Appendix B.
18 Delhi Community Plan Public Review Draft, May 2005, 8‐3.
19 Delhi Community Plan Public Review Draft, May 2005, 8‐3.
17
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
FRANKLIN COUNTY WATER DISTRICT
GOVERNANCE AND OPERATIONS
The Franklin County Water District (FCWD) was formed in 1962 and is empowered to
provide wastewater service to the unincorporated community of Franklin‐ Beachwood.
It is governed by a five‐member Board of Directors that holds public meetings on the
second Monday of each month. The district’s service area reaches north to Santa Fe
Drive, east to El Capitan Canal, south to Ashby Road, and West to Franklin. The district
also provides service to one strip on the north side of Dan Ward and to two
developments west of Franklin. A map of these boundaries is shown in Figure 5. The
District has a staff of three.20
The District’s total operating budget for FY 2006‐2007 is $910,100, including $8,500 in
debt service.21 The District’s reserve funds total $210,000.22
FCWD charges a flat monthly rate ranging from $19 to $23, depending on location, with
areas that depend on lift stations paying a higher rate. Hook‐up fees are $3,150 per
unit.23
INFRASTRUCTURE, FACILITIES, AND SERVICES
FCWD provides sewer service to 651 connections, including residential units, three
mobile home parks, and two schools. Its total system capacity is 600,000 gallons per day
(gpd), and it has an average wastewater flow of .371 mgd. The District’s facilities
include a wastewater treatment plant and two lift stations. It is preparing to install an
additional regional lift station to serve the western portion of the District. District staff
stated that these facilities are adequate to serve current demand.24
DEMAND AND CAPACITY
The Housing Element of the Merced County General Plan, adopted in 2003, cited
Merced County Association of Governments (MCAG) projections that the population of
the Franklin Beachwood area would grow by 858 people (from 4,110 to 4,698) between
2000 and 2010; this represents an increase of 14 percent, or 1.4 percent annually.25
20 Interview with District Secretary Virginia Chase, 20 Sep. 2006.
21 Franklin County Water District Budget FY 06‐07.
22 Franklin County Water District Budget FY 06‐07.
23 Interview with District Secretary Virginia Chase, 20 Sep. 2006.
24 Interview with District Secretary Virginia Chase, 20 Sep. 2006.
25 Merced County Year 2000 General Plan Housing Element, 2003.
18
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Franklin County Water District
Sphere of Influence
BELCHER
PA
N
D
IT
N
O
O
R
SOHAN
DAN WARD
TUPELO E G A E POPLAR L L
L M P VI L A
BEA O E M LUCICH R E FIR H C
B & B R A N
O
W D E N
FRANKLIN COUNTY WATER DISTRIC
S
T
A N TA
FE
C
LOBO
R
E
W O L F L A N C E F E R N W O O D O O K H O E M A K SOLIS
H B R S
C W
99 E A O
B D
A E
E K
M A
R
D
CABOT
ASHBY
COOPER
SOUTHERN
PACIFIC
ON RAMP
N LI
K 1 N 6 T A H
R F
Y O E S N A T E S A S D Y S
V S
A N P
RI
M
A
FULTZ IT
140
LAFCO RESOLUTION 1050C ON 2-28-2002
ESIRNUS
LITTLE SANDY
GRANITE CREEK
APACHE
N A R S E M O R M U H T
BOR
Figure 5
BELCHER
S
A
N
TA
FE
M N K S A LI A R L K P
A N S BN
O T L F R
A
SI N E
S
O U C WHITE BIRCH B
99
LADINO NEVADA
N BREEZE
A X LI
O K BELLEVUE
F N A
S R TAHOE A N TA
F E
F
CARDELLA
HEITZ
16TH BELCHER LEHIGH MERCED
ATWATER
ASHBY BEA FIR
MERCED
M
FRANKLIN
ELLIOTT
OLIVE
R 9999 5 9 U R 16TH U 23RD G 140 Y E V TQ K I WARDROBE N D Y S X U T R O 13 K TH G H I ²
BAILEY S N D
T P 5 9CONE
0 0.25 0.5 1Miles
of Merced County
19
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
The most recent MCAG projections are somewhat higher, showing a population increase
of approximately 2.4 percent annually between 2000 and 2010, and between 2000 and
2030, for a total population of 7,100 people by 2030.26
There are approximately 250 acres of prospective residential development (currently
farmland) waiting to be annexed to the District, including 100 acres outside the District’s
Specific Urban Development Plan (SUDP). These areas will not be able to develop until
the FCWD wastewater capacity increases. The District is in the planning process to
upgrade its plant by building two additional pumps; it is currently waiting to get a
permit through the Regional Water Quality Control Board (RWQCB) to increase its
capacity from 600,000 gpd to 1.25 million gpd. Once this permit process is complete,
hook‐up fees will be increased in order to cover the cost of these planned upgrades.27
The District’s Five Year Capital Improvement Budget Review for 2005‐2010 includes
plans for treatment plant upgrades, six pond transfer structures, three monitoring wells,
new collection lines, and new manholes, among other infrastructure.28
26 MCAG Merced County Population Forecast 2000‐2030, March 2004.
27 Interview with District Secretary Virginia Chase, 20 Sep. 2006.
28 Franklin County Water District Five Year Capital Improvement Budget Review for 2005‐2010.
20
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
HILMAR COUNTY WATER DISTRICT
GOVERNANCE AND OPERATIONS
The Hilmar County Water District (HCWD) was formed in 1963 and is empowered to
provide, water, sewer and stormwater disposal services to the unincorporated
community of Hilmar. Its service area encompasses just under 1,000 acres and
approximately 5,000 people. Figure 6 identifies the current boundaries of the District.
The District has a staff of five and a five‐member Board of Directors that holds public
meetings on the first Tuesday of each month.29
The District’s total proposed operating expenses for FY 2006‐2007 are $910,612.30
Revenues come primarily from water and sewer charges. HCWD uses a two‐tiered rate
system. Domestic water rates are $18.50 for the first 30,000 gallons, $1 per 1,000 gallons
from 30,000 to 40,000 gallons, and $2 per 1,000 gallons thereafter, on a 30‐day billing
cycle. Commercial rates are the same, except that any usage over 80,000 gallons is
charged at a rate of $1.10 per 1,000 gallons.31 Sewer rates consist of a $17 flat fee for
residential customers and a $17 per unit flat fee, plus $1.50 per 1,000 gallons of measured
water in excess of 10,000 gallons for commercial customers. Additional funding sources
include Merced County taxes, late charges, and on/off charges.32
The District’s reserves, including operational savings and development fees, currently
amount to approximately $2.3 million.33
INFRASTRUCTURE, FACILITIES, AND SERVICES
Water
HCWD provides water to approximately 1,500 connections. All of its water comes from
ground wells. The District currently operates three active wells and has a total capacity
of 2.3 million gallons per day (mgd). Water usage has summertime peaks of up to 2
mgd but generally averages 1.7 mgd. The District reports that existing facilities are
adequate to meet current demand.34
29 Interview with District Manager Dale Wickstrom, 20 Sep. 2006.
30 Hilmar County Water District Budget,2006‐2007.
31 Hilmar County Proposed Charges & Fees. (Personal communication from Dale Wickstrom, 28 Sep. 2006.)
32 Hilmar County Water District Budget, 2005‐2006. Personal Communication from Dale Wickstrom, 28
Sep. 2006.
33 Interview with District Manager Dale Wickstrom, 20 Sep. 2006.
34 Interview with District Manager Dale Wickstrom, 20 Sep. 2006.
21
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
SCHENDEL
K
N
LI
F
L
O O
L G
S
O
AUGUST
H
T
FI
F
RI
AMETHYST G
TIFFANY
AMERICAN N
S FOURTH E
S D
E THIRD M
R A
P C
D C Y FIRST L E
N
FI
ACACIA
WI
BLOSS
RI A D A R D E R T N IL
A E N K M C A
L ECHO
DAYTON GEER
N
W
O
T
S
G
N
U
O
WILLIAMS Y
CRANE
5
6
1
N
O
E S
D R
R A
V E L RIVER
TURNER
RALOHCS
RHINESTONE
OPAL
SOMERS
ARLON
J A D E NIWRI
Figure 6 Hilmar County Water District
Sphere of Influence
5
6
1
K
N
LI
F
L
O
G
T
R
O
P
E
G
D RI B
K N LI
F IR L
W O
G
IN
L R A E P
DELHI
HILMAR
LIVINGSTON
Legend ²
H
STEVINSON T
SOI FI
F
RI
G
0 0.25 0.5 1Miles
of Merced County LAFCO RESOLUTION 1003F ON 5/22/2003
22
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Wastewater
The District provides wastewater service to approximately 1,490 connections. HCWD
sewer facilities include five lift stations and a wastewater treatment plant that began
operation in 2003. The wastewater treatment system has a permit for the discharge of
up to 0.55 mgd; the District experiences average daily wastewater flow of 0.45 mgd.35
The district has a total wastewater capacity of .55 mgd. The District reports that existing
facilities are adequate to meet current demand.36
Storm Drainage
The east and west sides of sides of the Hilmar community are each served by one
booster lift station. Each of the community’s lift stations are connected with storage
basins by an underground pipe system. Irwin, the southern area of the community, has
no drainage system for storage, collection, or discharge, and the rest of the community
disposes of its storm drainage water to the Turlock Irrigation District (TID) Lateral
Number 7. The HCWD has an agreement with TID, which defines the areas allowed to
drain to their facility. Currently, the agreement permits 429 acres of land within the
HCWD to drain to the TID facility. This area discharges storm drainage water at a rate
of 17,500 gpm.
DEMAND AND CAPACITY
The 2003 Housing Element of the Merced County General Plan cites MCAG figures
which project that Hilmar’s population will grow from 4,807 to 5,031 between 2000 and
2010, an increase of 5 percent overall, or 0.5 percent annually.37 Updated figures from
MCAG’s March 2004 population forecast project a slightly greater increase during this
period. Between 2000 and 2030, MCAG projects total growth for Hilmar of 4,693, or 3.3
percent annually for a total of about 9,500.38
Merced County is currently in the process of preparing an updated Community Plan for
Hilmar to serve as a tool to guide future community growth and development. A
facilities overview was prepared by the District in response to growth proposed in
preliminary versions of this Plan. The growth population considered for the community
in the Plan and facilities overview included a maximum of 15,000 people. (This
anticipated maximum has since been reduced to 11,000 based on development capacity,
but the change has not affected facilities needs.39) According to the District, the added
growth would require the development and installation of two new wells with a
minimum production level of 1,500 gallons per minute (gpm) each, as well as the
35 Interview with District Manager Dale Wickstrom, 20 Sep. 2006.
36 Interview with District Manager Dale Wickstrom, 16 Oct. 2006.
37 Merced County Year 2000 General Plan Housing Element, 2003.
38 MCAG Merced County Population Forecast 2000‐2030, March 2004.
39 Interview with District Manager Dale Wickstrom, 20 Sep. 2006.
23
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
installation of a 1 million‐gallon storage tank. HCWD owns a site for storage tank
installation. Research and testing of potential well sites will be required to evaluate the
quality and quantity of available water and determine whether these sites meet the
requirements of HCWD, the State of California, and the Environmental Protection
Agency (EPA).40
In addition, proposed growth would require a wastewater treatment capacity of 1.4
mgd, requiring a new wastewater discharge permit from the State Water Resources
Control Board (SWRCB). The SWRCB is presently evaluating the use of percolation
beds, which are used for disposal at the existing treatment facility, and may require that
any new discharge be placed instead on agricultural land to cultivate non‐food crops. If
this process were required, effluent flow would be stored in ponds during the winter
and discharged to agricultural lands during the growing season. This disposal process
would require a larger area of land than the area necessary for disposal through
percolation basins.41 SWRCB action relating to HCWD is currently on hold, pending
administrative processes required for the official closure of the District’s old wastewater
treatment plant.42
The expansion of the wastewater treatment facility will require the acquisition of
additional land for treatment and for the construction of additional disposal and storage
basins. County Health Code requires that any land used in ponds or basins have a ten‐
foot separation from groundwater level to the bottom of the basin; lands surrounding
the existing wastewater treatment plant have not been studied for groundwater level.43
Capital facilities fees are currently in place to fund infrastructure required by new
development. Each new single‐family residence in the District is charged a $2,500 sewer
facilities fee, a $3,500 water facilities fee, and a $2,000 drainage impact fee. Fees are
payable prior to District approval of any Subdivision Improvement Plan or Final
Subdivision Map. These fees are updated annually based on the Engineering News
Record Construction Cost Index. In addition, the District charges sewer and water
connection fees of $2,500 and $2,000, respectively, per single‐family residence, as well as
a $200 sewer/water inspection fee. These fees are payable when the District issues a Can
and Will Serve Commitment Notice prior to issuance of a County building permit.44
The storm water collection system will require expansion to accommodate the growth
anticipated in Hilmar. At the current level of development, Lateral Number 7 is over the
available flow capacity. In a study prepared by the District in support of the ongoing
Hilmar Community Plan Update, the District estimates that approximately 18 acre feet
of new stormwater retention ponds will be required. These retention ponds will
40 Hilmar County Water District Facilities Overview.
41 Hilmar County Water District Facilities Overview.
42 Interview with District Manager Dale Wickstrom, 20 Sep. 2006.
43 Hilmar County Water District Facilities Overview.
44 Hilmar County Water District Facility Fees/Connection Fees 2006.
24
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
typically be designed as dual use park/retention pond areas. To discharge this
stormwater, improvements are required to TID Lateral Number 7, which winds through
the community. It will be necessary to conduct a study identifying the system
improvements that are required in order to handle the future increases in storm
drainage flows. The two districts must reach an agreement regarding future design and
construction as well as implement a new development fee structure to fund it.
25
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
LE GRAND COMMUNITY SERVICES DISTRICT
GOVERNANCE AND OPERATIONS
The Le Grand Community Services District (LGCSD) was formed as a sanitary district in
1955 and was reorganized into a CSD which was approved by LAFCO in 1980. Shortly
after 1984 the district took over ownership of the former private water company assets
and full responsibility for water services. It currently provides both water and
wastewater services to an area of approximately 384 acres in the unincorporated
community of Le Grand (see Figure 7). Its service population is around 1,760, based on
the 2000 Census figure for the Le Grand Census Designated Place (CDP). Its staff
includes two full‐time and two part‐time employees. A 5‐member District Board of
Directors meets on the first Thursday of each month.45
A number of annexations currently being contemplated could expand LGCSD’s service
area. These include an annexation of 30 acres on the District’s west side and a
“housekeeping” annexation of 10 acres acquired by the local high school and already
accommodated by an amendment to the County’s Urban Growth Boundary for the area.
These annexations may occur as part of a single process.46
The District’s total operating expenses for FY 2006‐2007 are $349,425. The total
operating expenses include $186,672 in the water fund and $162,753 in the sewer fund.
Non‐operating expenses for sewer service include $19,000 in interest on long‐term debt.
Most of the District’s residential customers are unmetered and pay a flat rate of $33 per
month for water and $34 per month for wastewater services. These rates may be
adjusted January 1, 2007 by $1 to $2 per month. Metered customers pay based on a two‐
tiered system. The base rate for water service is $33 per month for the first 16,500
gallons and $2.57 per 1,000 gallons thereafter. Residential customers pay $34.00 per
dwelling unit per month for wastewater service. Metered customers pay a base rate of
$34.00, which covers wastewater treatment for the first 12,000 gallons of water. The
charge is $2.77 for every 1,000 gallons thereafter. These rates are currently under review
and may be subject to change January 2007.47
45 Interview with District Engineer Jerry Herman (Giersch and Associates), 20 Sep. 2006.
46 Interview with District Engineer Jerry Herman (Giersch and Associates), 20 Sep. 2006.
47 Interview with District Engineer Jerry Herman (Giersch and Associates), 24 Oct. 2006.
26
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Le Grand Comunity Services District
Sphere of Influence
LE GRAND COMMUNITY SERVICES DISTRICT
LE GRAND COMMUNITY SERVICES DISTRICT
²
LAFCO RESOLUTION 1056A ON 12-1-94
NRUTNIM
ONSERF
JORDAN
M
A
H
G
N
NI
N
U
SAVANA C HAINLINE
M F C IL D L O M W O E R L E L W A S H IN G S A N T A F ER S O N
T O F E
NF
E
J
LE GRAND
MARSHALL
BRICE K
OGLEL
O
P
FORD
S
A
N
T
A
F
E
K
O
O
C
E
E
K
C O
M N
S
E
R
LE GRAND F
0 495 990 1,980 Feet
NRUTNIM
S
A
N
T
E L L A F E H C
R
USAVANA
B
N
E
S
P
I
BUCHANAN HOLLOW
NESUALC
Figure 7
M
A
H G N NI
C
U
N JORDAN
E
E
K
C
M
L
R
A
E
of Merced County
27
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
INFRASTRUCTURE, FACILITIES, AND SERVICES
Water
LGCWD provides water service to 485 connections. All water comes from groundwater
wells. The District has two primary wells and one standby. Its maximum production
capacity is 1.8 mgd. Yearly average usage is 0.30 mgd, indicating that current facilities
are adequate to meet current demand.48
Wastewater
LGCWD provides wastewater service to approximately 485 connections. It maintains
one lift station and a treatment plant with a permitted capacity of 350,000 gpd. The 12‐
month average wastewater flow for 2004‐2005 was 154,000 gpd. The District states that
existing facilities are adequate to meet current demand.49
DEMAND AND CAPACITY
According to MCAG’s March 2004 Population Forecast for Merced County, the
population of the Le Grand area is projected to grow by 1.2 percent annually between
2000 and 2030, increasing from 1,760 to 2,400 during that period.50
Currently a total of 513 residential lots in various stages of planning are located within
the District or seeking eventual annexation to the District. Of these, 194 have approved
tentative maps; the District has conditional service agreements with the remaining 319.
Under some of these service agreements, developers will be required to build wells and
related wellhead treatment facilities in lieu of paying development fees. Such
dedications could potentially be subject to reimbursement arrangements whereby
developers who build water infrastructure are later reimbursed by future developers for
any excess capacity.51 Water facilities may also be paid for through development fees,
currently set at $3,886 per residential connection for water.52
The District has sufficient wastewater capacity to serve the proposed subdivisions,
though it anticipates that additional planning may become necessary in the near future.
One to two additional lift stations may be built by developers and dedicated to the
District. Developer fees for sewer infrastructure are currently set at $2,190 per
residential connection.53
48 Interview with District Engineer Jerry Herman (Giersch and Associates), 16 Oct. 2006.
49 Interview with District Engineer Jerry Herman (Giersch and Associates), 16 Oct. 2006.
50 MCAG Merced County Population Forecast 2000‐2030, March 2004.
51 Interview with District Engineer Jerry Herman (Giersch and Associates), 20 Sep. 2006.
52 Interview with District Engineer Jerry Herman (Giersch and Associates), 30 Oct. 2005.
53 Interview with District Engineer Jerry Herman (Giersch and Associates), 20 Sep. 2006.
28
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
MIDWAY COMMUNITY SERVICES DISTRICT
The Midway Community Services District Sphere Report, which was issued in 1984,
provides the primary information available on the Midway Community Services
District.
GOVERNANCE AND OPERATIONS
The Midway Community Services District (MCSD) was established in 1967 to provide
domestic water and sewage disposal services to the Midway community. According to
the District’s Sphere Report issued in 1984, the district is approximately 684 acres in size.
It encompasses the community of Midway, which is an unincorporated community
located in the southwestern portion of Merced County between the City of Dos Palos
and the unincorporated community of South Dos Palos. The boundaries of the Midway
Community Services District are identified in Figure 8. The District is governed by a 5‐
member Board of Directors, which is elected by the voters residing within the District.54
INFRASTRUCTURE, FACILITIES, AND SERVICES
Water
As of 1984, the District served 186 customers with water, which it obtained from the City
of Dos Palos.55 For the provision of potable water supplies, the Midway Community
Services District has entered into a Joint Powers Authority (JPA) involving the City of
Dos Palos; Merced County; the North Dos Palos Water District; and the South Dos Palos
County Water District. Due to local groundwater quality limitations, the JPA now
obtains surface water from the California Aqueduct. The water is provided through a
surface delivery system using Central California Irrigation District canals, and is treated
at a plant owned by the JPA and operated under contract with a private firm. The
district has an allotment of capacity from the system as part of the JPA agreement, but
landowners within the district boundary must receive approval directly from the district
for water connections. Monthly billing is paid directly to the City of Dos Palos, which in
turn reimburses the firm operating and maintaining the treatment plant and water
distribution system. Any funds remaining are returned to the Midway Community
Services District. 56
54 Midway Community Services District Sphere Report, October 1984.
55 Midway Community Services District Sphere Report, October 1984.
56 Draft Initial Study/Negative Declaration, Merced County and Fresno County Minor Boundary Change,
January 2007.
29
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Midway Comunity Services District
Sphere of Influence
LINDEN
K
N
OLIVE A
R
F
BLOSSOM ALMOND
VALERIA
OAK
A
O N D S D E R N G T N O L M A
XI Y E E L R
CHRISTIAN
3
3
SHAIN H X TJ SI K
H
T
N
LE
V
E S
H N
T
F
FI P M
Q O ²
LAFCO RESOLUTION 1059 ON 10/25/1984
NREFDER
T T
R E
E N R
N
N E
N
L
FI
O B E L
D C H MARGUERITE
A O T O D MI T C K N M E S N E R A L A R F
R
E
N PALO ALTO
E
G A
U
M
E
R
O
L
GI
NI
H A R C VI
WILLOW
E
E
G
C
T M
U N L A W
STEARMAN W
O
SKINNER O
D
GLOBE
HI R D R T H T U O F
H
T
O U R H T H F G
EI
H T
N
AQUA VISTA O N NI
T
G
N
XI
E
L
KNARF
Figure 8
L O R ALMOND A C
Y
E
R B
U S
A L D R L M T O N Y N O H 3 3 FI R N T E P A G ET E
D XI
N R FI F
VALER
C
IAIDA
R E
HI L
TSAN MIDWAY
TA
FE
SHAIN O ML
P N
H
T
N E
V
E S
0 500 1,000 2,000 Feet
of Merced County
30
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Wastewater
As of 1984, the District’s sewage was handled by the City of Dos Palos’ sewage
treatment plant. Approximately 90,000 gallons per day of the plant’s 400,000 gallons per
day capacity were allocated to the Midway District. The number of gallons per day
allocated to the Midway District is an estimate based on the District’s population and
the assumption that 150 gallons of wastewater are generated per person per day. Dos
Palos’ wastewater treatment plant, treated approximately 300,000 gallons of wastewater
per day which is about 75 percent of the plant’s 400,000 gallon per day capacity.57
The District has entered into a JPA involving the City of Dos Palos and South Dos Palos
County Water District for the provision of sewer service within the districtʹs boundary.
The JPA‐funded sewer plant provides wastewater treatment, and a private firm is
retained by the JPA to operate and maintain the treatment plant and sewer collection
lines within the district territory. The District has an allotment of connections for
remaining capacity, and landowners within the district boundary must receive approval
directly from the District for connections. All monthly billing is paid to the City of Dos
Palos. Through the JPA, the City reimburses the private firm for operations and
maintenance. Any remaining funds are returned to the Midway Community Services
District.
DEMAND AND CAPACITY
In 1984, it was reported that based on the community’s slow rate of population growth
the District’s sewer and water facilities were adequate.58
57 Midway Community Services District Sphere Report, October 1984.
58 Midway Community Services District Sphere Report, October 1984.
31
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
NORTH DOS PALOS WATER DISTRICT
The North Dos Palos Water District Sphere Report, which was issued in 1984, provides
the primary information available on the North Dos Palos Water District.
GOVERNANCE AND OPERATIONS
The North Dos Palos Water District was established in 1976 in order to provide domestic
water service to residences, businesses, and industries within the District. In 1984,
approximately 100 people lived in the District. It consisted of approximately 143 acres
surrounding the intersection of Elgin (Highway 33) and Carmellia Avenue, immediately
north of the City of Dos Palos. Land use within the District is mainly agricultural, and
residents are scattered along the two roads which traverse the District. The boundaries
of the North Palos Water District are identified in Figure 9. It is governed by a 5‐
member Board of Directors, which is elected by residents within the District.59
INFRASTRUCTURE, FACILITIES, AND SERVICES
The District’s Sphere Report reports that the District obtains its water from the City of
Dos Palos and serves approximately 41 water hookups. In 1984, the District’s water
supply was considered adequate, although the water quality was not considered
satisfactory.60 For the provision of potable water supplies, the North Dos Palos Water
District has entered into a Joint Powers Authority (JPA) agreement involving the City of
Dos Palos; Merced County; the Midway Community Services District; and the South
Dos Palos County Water District. Due to local groundwater quality limitations, the JPA
now obtains surface water from the California Aqueduct. The water is provided
through a surface delivery system using Central California Irrigation District canals, and
is treated at a plant owned by the JPA and operated under contract with a private firm.
The district has an allotment of capacity from the system as part of the JPA agreement,
but landowners within the district boundary must receive approval directly from the
district for water connections. Monthly billing is paid directly to the City of Dos Palos
which in turn reimburses the firm operating and maintaining the treatment plant and
water distribution system. Any funds remaining are returned to the North Dos Palos
Water District. 61
59 North Dos Palos Water District Sphere Report, October 1984.
60 Midway Community Services District Sphere Report, October 1984.
61 Draft Initial Study/Negative Declaration, Merced County and Fresno County Minor Boundary Change,
January 2007.
32
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
North Dos Palos Water District
Sphere of Influnce
3
3
NORTH DOS PALOS WATER DISTRICT
M L A P
²
LAFCO RESOLUTION 1062 ON 10/24/1984
RETNEC
CARMELLIA
IONE
R
FI
LORAINE
E T A G N N T O A E R LINDEN K NI L D N O
N R O OLIVER
A O G
OLIVE R F F LI
A
C BLOSSOM S
D L E D O N R N R A Y E N E C PALO ALTO O R U E L L IDA VALERIA
OAK A R E D A M
CHRISTIAN
NREFDER
CORNELIA
GEORGE
SHARON SANTOS MERCED THOMAS
R
E
N N
O
C
ALMOND A L R E N E G L E N L B N O A Y R M L
A
C
T U N L A W
STEARMAN
NOSLLIW
STOCKING
S
O
L
A
P S O D
DORA
E M U H
WILLOW
MCKENZIE GEIS MCINTYRE
SKINNER
SIRRAH
R
E
V
E
D
IN
N O Y G L A V E TI E N A T S T
E
N
N L E E L
N B E
T O D D IK S R E MI T C H
ALMOND Y H T A K A NI GI R VI
MCGINTY
PLUM COLE MCCURDY
W
O
O
D
KNARF
Figure 9
CARMELLIA
N N Y
L OLIVER
R
FI
BLOSSOM ANDREWS L O
Y A R O A A R R B R E Y EUCALYPTUS P A L M DI A N A C U N A N R I T O NORTH DOS PALOS H E
GCARMELLIA T
N S
XI RR E L E D S FI T E L N O 3 EIDA N 3 C Y SAN R E
TA
FE
ML
Q
0 0.25 0.5 1Miles
of Merced County
33
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
DEMAND AND CAPACITY
The North Dos Palos Water District is relatively small in size and population. The
District is mostly rural and semirural in character with a low population density. Given
these conditions, the District’s supply of water, which it obtained from the City of Dos
Palos was considered adequate.62
62 North Dos Palos Water District Sphere Report, October 1984.
34
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
PLANADA COMMUNITY SERVICES DISTRICT
GOVERNANCE AND OPERATIONS
The Planada Community Services District (PCSD) was formed in 1967 and serves the
community of Planada and a small number of locations outside the District, covering a
total area of 924 acres (see Figure 10). It has a total service population of 5,500 people. It
has a six‐person staff and a five‐member Board of Directors, which meets the second
Tuesday of each month at 103 Live Oak Street in Planada.63
Total operating expenses for FY 2006‐2007 are $888,970. This includes $442,985 for water
and $445,985 for sewer. Additional expenses include $27,229 in vehicle payments,
$40,800 in long‐term debt payments, and $108,000 in reserve deposits, evenly divided
between water and sewer reserves.64 Total loans and reserves amount to $176,029.
Monthly water rates are $33 for ¾ inch to 1 inch service, $44 for 1.5 inch services, and
$70 for 2 inch service; monthly sewer rates are $28.65
INFRASTRUCTURE, FACILITIES, AND SERVICES
Water
PCSD serves 1,227 water connections. Its production capacity is approximately 4.32
mgd. Average usage is around 1.1 million gallons per day and 400 million gallons per
year.66
Domestic water is supplied to PCSD customers by six groundwater wells. Water is
chlorinated, pumped into the water transmission system, and conveyed to residents
through a pressurized water system.67 District facilities include six wells, six pressure
tanks, and approximately 14 miles of water main. According to the District, existing
facilities are adequate to meet current demand.68
Wastewater
The District provides service to 1,411 sewer connections. Its wastewater treatment
capacity totals 0.53 mgd; existing average daily wastewater flow is 0.50 mgd.
63 Interview with Martha Mayo, 13 July 2005. Planada CSD website,
<http://www.planadacommunitysd.com/cgi‐bin/site/page.cgi> Personal communication from Lee
Fremming, 4 Sep. 2006.
64 Planada Community Services District Annual Budget FY 2006‐2007.
65 Personal communication from Lee Fremming, 4 Sep. 2006.
66 Personal communication from Lee Fremming, 4 Sep. 2006.
67 Planada CSD website, <http://www.planadacommunitysd.com/cgi‐bin/site/page.cgi>
68 Personal communication from Lee Fremming, 4 Sep. 2006.
35
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
PLANADA COMMUNITY SERVICES DISTRICT
WY
140
H
140
HWY
PLANADA COMMUNITY SERVICES DISTRICT
CHILDS
R E HYDE L
L
MI
GERARD
TOEWS
N
A L MISSION
A
E
H
W G S A
R N
U T A
B F S E
N
AI
L P
TTEVI
N
E
D
Y
A
H
Y
D O
STANFORD C
KRAFFT K C
E
B
Y
E
KADOTA L R
O
M
NOB
BIGLER
R E E
A G T T HASKELL
G U S
MI L L S H U P P
A TOPEKA
N
A D
OLLEUGRA
Figure 10 Planada Community Services District
Sphere of Influence
N
N
IW
G
P CHILDS
A
IC
O C O
G R
E T
D E
O Z
B KRAFFT
MERCED
TOEWS
WY
140
H
PLANADA
S A
N
T A F
E
LEGRAND ²
S
R
9
9
0 0.25 0.5 1Miles
of Merced County LAFCO RESOLUTION 1055B ON 1-28-93
36
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
District facilities include two lift stations and one treatment plant.69 The PCSD
wastewater collection facility uses a gravity collection/main‐lift system to move sewage
to the wastewater treatment plant, located to the southwest of the community of
Planada.70 Although existing facilities are adequate to meet current demand, the
District is presently processing an Environmental Impact Report (EIR) for a proposed
water treatment facility expansion. In addition to increasing capacity to 1.2 mgd, this
facility is planned to include agricultural reuse of secondary effluent.71
DEMAND AND CAPACITY
The Planada Community Plan, finalized in December 2003, anticipates a buildout
population of 8,500, based on U.S. Census data showing average annual growth of 3.9
percent between 1980 and 2000. Although the time period of the Plan is through 2015, it
is noted that the population could reach 8,500 before that point depending on the local
economy and housing market.72
The District reports that additional water wells, wastewater treatment capacity, and staff
will be needed to meet projected future demand. As noted, the District is currently
preparing an EIR for the proposed wastewater treatment facility expansion. This facility
will have a capacity of 1.2 mgd, sufficient to meet immediate development needs as well
as long‐term demand associated with buildout of the Planada Community Plan. In
addition, water and sewer connection fees have recently been substantially increased to
meet anticipated capital improvement costs. (In some cases, developers have prepaid
their sewer fees to fund the District’s initial purchase of land for the wastewater
treatment plant expansion.) Developers may also be required to dedicate community
well sites in conjunction with new development.73
The Planada Community Plan also cites grant funds as a potential source of funding for
capacity expansion and related studies; Community Development Block Grant funds
were used in 2000 to complete a wastewater system study on current capacity, current
usage, and planned capacity.74
69 Personal communication from Lee Fremming, 4 Sep. 2006.
70 Planada CSD website, <http://www.planadacommunitysd.com/cgi‐bin/site/page.cgi>
71 Personal communication from Lee Fremming, 4 Sep. 2006. Interview with Lee Fremming, 21 Sep. 2006.
72 Planada Community Plan, Dec. 2003, 2‐2.
73 Personal communication from Lee Fremming, 4 Sep. 2006. Interview with Lee Fremming, 21 Sep. 2006.
74 Planada Community Plan, Dec. 2003, 7‐1.
37
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
SANTA NELLA COUNTY WATER DISTRICT
The Santa Nella County Water District (SNCWD) MSR was completed by EPS as part of
a separate process (approved March 23, 2006) and is reproduced here. This MSR is
presented in a somewhat unique format because the District’s service area overlaps with
several other special districts. The next section describes these districts and outlines
how the proposed reorganization will affect each of them.
DISTRICT BOUNDARY OVERLAP
The District currently provides commercial and residential water and wastewater
service in the Santa Nella area. Most of the property within the Santa Nella Community
Specific Plan area is also located within the District. However, some of the Plan area is
outside the boundaries of the District and will require expansion of the SOI and
annexation to receive District services. Figure 11 identifies the current boundaries of the
District.
A majority of the Community Plan area is also within the boundaries of the San Luis
Water District, a California Water District (“San Luis”). There is a significant overlap of
approximately 1,800 acres between the boundaries of the two districts.
San Luis was formed in 1951. It is governed by a five‐member Board of Directors and
has a staff of 14 full‐time employees and one part‐time employee. It is legally
authorized to provide service to an area of 66,449 acres, though not all of this land is
actually served by San Luis facilities. The majority of San Luis’ current population is
also within the Santa Nella Water District’s service area; San Luis estimates that it has
fewer than 600 current residents who do not live within the Santa Nella District. San
Luis has several hundred agricultural connections. Excluding connections served
through the District, it has fewer than 100 municipal water connections, though this
number is expected to increase over the next several years as evidenced by the 402 new
connections pending in the Fox Hills community. It has one water treatment facility
serving the San Luis Hills subdivision and adjacent commercial development. A second
treatment plant is under construction and will come on line when required by new
development of the Fox Hills community.
San Luis obtains its water supply through a contract with the United States Bureau of
Reclamation. The water is diverted by San Luis from the Delta Mendota Canal and the
San Luis Canal. San Luis sells a portion of its raw water supply to SNCWD for use
within that portion of the District that is also within San Luis. The District operates the
water treatment and distribution system which turns this raw water into the potable
water serving residents and businesses in Santa Nella.
38
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Figure 11 Santa Nella County Water District
Sphere of influence
FAHEY
H
T
R
O
W
T
HI
W
MCCABE
3
A 3
Z
A
L
P
3
3
SANTA NELLA COUNTY WATER DISTRICT
PLUTO HENRY MILLER
W
BAYVIE
M
E
T I-5
O T
C E
T MA
S O L
W E C N E L
S A
UI N T
L N S A
O
E
L
E
D
GUSTINE
SANTANELLAVOLTA
LOS BANOS
E
L
A
3 D
3 L
L
HI
²
0 0.25 0.5 1Miles
of Merced County
LAFCO RESOLUTION 1063 ON 10/25/84
39
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
San Luis and the District recognize that the overlap in the boundaries and service areas
of the two Districts is unnecessary and creates administrative difficulties and additional
expenses that will be exacerbated as the Plan area urbanizes. Therefore, San Luis and
the District have agreed to carry out a reorganization of the two public districts pursuant
to the Reorganization Act so that all land within the Plan area will be within the
boundaries of the District and no land within the Plan area will be within San Luis. In
addition, San Luis will assign that portion of its water supply contract to the District that
is related to the lands being detached from San Luis. The District, thereafter, will
directly purchase water from the Bureau of Reclamation rather than through San Luis
and San Luis will no longer have any role or obligation in the provision of water to lands
within the District. Before this reorganization can take all of the Specific Plan area must
be included within the District’s SOI.
The updated Santa Nella Community Plan boundary also includes territory within the
New Del Puerto Water District (“Del Puerto”) and the Central California Irrigation
District (CCID).
Del Puerto was formed in 1994 through the consolidation of 11 water districts. It
encompasses an unincorporated area of around 45,000 acres, located primarily in
western Stanislaus County, with some additional territory in Merced and San Joaquin
Counties. Under a contract with the U.S. Bureau of Reclamation, Del Puerto provides
over 140,000 acre‐feet of water annually to 175 retail customers who purchase irrigation
water for agricultural purposes. The district is governed by a seven‐member Board of
Directors and has four full‐time employees. Portions of Del Puerto are located within
the City of Patterson’s SOI, resulting in ongoing detachments as territory is annexed to
the City.75
The SNCWD currently serves some development within Del Puerto at the northern
corner of the Community Planning area, but relies on its own well water as the raw
water supply. The portion of Del Puerto that falls within the Santa Nella Specific Plan
area has been in the SNCWD SOI since 1984. Therefore, the sphere modification
currently being sought will not impact the Del Puerto SOI. However, shortly after the
Santa Nella SOI has been amended to include all of the Specific Plan area, a
reorganization proposal is expected to be submitted to Merced County LAFCO to detach
from Del Puerto the approximately 43 acres within the Specific Plan area and to annex
that land to the District. An SOI modification will be proposed at that time.
It is anticipated that this future reorganization will not have any impact on the water
supply currently available to water users in Del Puerto. The owners of the detached
land will not seek to have their allocated share of the Del Puerto water transferred to the
District. That water supply will stay with Del Puerto and will, therefore, in a very small
way, enhance the water supply for the lands remaining in Del Puerto. The owners of the
75 Stanislaus County Local Agency Formation Commission, Resolution No. 2003‐22, LAFCO Service Review
– New Del Puerto Water District.
40
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Del Puerto land to be annexed to Santa Nella will need to demonstrate that additional
water can be provided to Santa Nella to support its anticipated needs.
The CCID provides agricultural irrigation water within a service area of 47,949 acres.
When the district has excess water available, it also provides water to 14,584 acres of
“Class II ground” located outside its boundaries. Ongoing annexations by surrounding
cities such as Los Banos, Mendota, Dos Palos, Gustine, and Newman have resulted in
detachments from the CCID.76 The Santa Nella County Water District does not
presently serve any land within the CCID boundary. The 180 acres of CCID land that is
within the Specific Plan area is not currently within the District’s SOI. Therefore, the
expansion of the District’s SOI will include those lands within the Specific Plan area that
are currently within CCID, similar to the San Luis and Del Puerto lands.
Once the District’s SOI has been amended, a second set of actions can occur. A
reorganization proposal is expected to be submitted to Merced County LAFCO to detach
all lands within the Specific Plan area that are also within CCID and to annex these lands
to the District. The owners of the land detached from CCID will not seek to have their
allocated share of CCID water transferred to the District. That water supply will stay
with CCID and, therefore, will, in a very small way, enhance the water supply available
to the lands remaining in CCID.
The water supply needed to support development of the land detached from CCID will
be supplied by water that has already been purchased by the owners of that land from
the Mercy Springs Water District in Fresno County. The Mercy Springs supply will be
transferred to the District through a partial assignment of the Mercy Springs’ U.S.
Bureau of Reclamation Contract. That assignment will be carried out through a separate
transaction from the partial assignment of the San Luis contract to the District.
PURPOSE AND METHODOLOGY
This MSR is being prepared to facilitate amendment of the District’s SOI, preparatory to
completing the reorganizations described above. The District’s SOI boundary was
approved by Merced County LAFCO Resolution No. 1063 on October 25, 1984. It is not
required that the San Luis and CCID SOIs be amended prior to the reorganizations
described.
Once the SOI boundaries of the District are expanded San Luis and the District intend to
complete their reorganization to facilitate the Plan’s goal that the District act as the retail
water and wastewater provider to the Plan area. The District will also need to receive a
partial assignment of the existing contract with the Bureau of Reclamation to receive this
federal water supply directly. The Del Puerto/District and CCID/District
reorganizations will be the subjects of separate LAFCO applications.
76 Interviews with Maria Segueira and Chris White, CCID, 15 Aug. 2005.
41
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
These reorganizations are intended to enable a single local governmental agency (the
District) to carry out a water acquisition plan and implement a water and wastewater
infrastructure plan, both of which are prerequisites to build‐out of the Specific Plan area.
The current situation, with the Specific Plan lands being located within four overlapping
agencies hampers area‐wide planning, is cumbersome, and may lead to delays and
significant governmental inefficiencies.
The District retained Economic & Planning Systems, Inc. (EPS) to develop the MSR for
the District. EPS met with District staff and obtained documents detailing the District’s
current resource policies, as well as future plans. EPS has also obtained relevant
information directly from San Luis, Del Puerto, and CCID, and communicated with
Merced County LAFCO staff regarding the proposed reorganization. EPS used the
information obtained from documents and interviews to write this report, which makes
the nine determinations required by law for each provider. The report has been
submitted to the District, San Luis, and LAFCO for their review. Comments from the
District, San Luis, and LAFCO have been incorporated into the report.
From the standpoint of this MSR, the facilities and the past and future operations of the
District will be emphasized. It is the only one of the four local water agencies whose
municipal service operations will be significantly impacted through the SOI
amendments and subsequent reorganizations. Del Puerto and CCID do not currently
provide any municipal services. That status will remain unchanged after the
reorganizations are completed. San Luis does propose to increase its municipal services,
but only in areas that are unaffected by the proposed reorganization. From the San Luis
perspective, the proposed reorganization is being proposed to implement a decision
made by Merced County over six years ago that the Santa Nella County Water District
should provide retail water and wastewater service to the Santa Nella Specific Plan area.
The reorganization will not affect San Luis’ plans to provide municipal services to the
Fox Hills and Villages of Laguna San Luis areas that are within the San Luis boundaries
and outside the District boundaries. San Luis would provide retail services to the lands
it will detach if those lands were developed and met the requirements of San Luis.
GOVERNANCE AND OPERATIONS
The District was formed in 1965 pursuant to California Water Code Section 30000, et
seq., and is empowered to provide services including water and wastewater treatment
services. It is governed by a five‐member Board of Directors elected by the registered
voters residing within the District boundaries. The Board meets the second Thursday of
each month at 12931 South Highway 33, Santa Nella. It has a staff of four operators and
two office employees. The District’s day‐to‐day operations are carried out by a District
Manager and staff that operate and maintain its existing water and wastewater facilities.
Outside contractors provide legal and engineering services when needed.77
77 Personal Communication from District Manager Danny Neville, 9 May 2005.
42
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
District revenues for FY 2004‐2005 were approximately $659,000; total budgeted
expenditures were $638,000. The District’s total long‐term debt amounts to
approximately $5 million.78
Standard water rates for Commercial Metered services range from $34 for the first 2,000
cubic feet of usage and $1.69 per 100 cubic feet thereafter (for a 5/8” to 1” meter) to $304
for the first 18,000 cubic feet and $1.69 per 100 cubic feet thereafter (for a meter of 3” or
greater). Monthly charges for Domestic Metered services are $2.07 per actual 100 cubic
feet of use registered on the water meter.79
Domestic services with 5/8” to 1” meters are assessed a $10 monthly flat rate for sewer
service. Commercial services with meters larger than 1” are charged $25 for the first
1,000 cubic feet of water use and $2.50 per 100 cubic feet thereafter.80
The SNCWD has Master Plans for both its sewer and water systems. Originally written
in 1992, these plans were revised in 1995. In June 2005, the District’s consulting engineer
completed pre‐design studies following the recommendations of these Master Plans and
modifying them as necessary. These pre‐design studies are the first step towards
providing the water and wastewater expansion infrastructure needs of the Santa Nella
Specific Plan area.
INFRASTRUCTURE, FACILITIES AND SERVICES
The District has a current service area of 2,466 acres and a proposed service area of 2,560
acres. Its current service area population is estimated at 1,200. It provides water and
sewer services to a total of 497 connections, distributed as follows: 24 commercial, 18
irrigation, 159 metered residential, and 296 unmetered residential.81
Water
The District’s water production and distribution facilities include the San Luis Canal
Water Treatment Plant (WTP). This plant began operation in 1987 and is designed to
accommodate 1.2 mgd maximum flow rate, with a peak capacity of 1.8 mgd. Its major
components include a raw water pump station, two treatment units, a filtered water
pump station and storage tank, two backwash water reclamation basins, and two sludge
drying lagoons. Water is treated using a variety of processes, including chemical
flocculation, sedimentation, filtration, and chlorination.82 The community’s existing
water distribution system is a loop system, with laterals serving a mobile home park, the
highway commercial area north of Henry Miller Road, and the single‐family
78 Ibid.
79 Water Service Schedule of Rates and Charges.
80 Ibid.
81 Personal Communication from District Manager Danny Neville, 9 May 2005.
82 Santa Nella County Water District Master Water Plan, May 1995, 18.
43
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
subdivisions west of Highway 33.83 A low‐pressure water transmission pipeline carries
water north from the WTP to a distribution point, where additional facilities include two
surface water storage tanks and a booster pump station (built in 1988).84
The firm of Stoddard & Associates is currently planning the water infrastructure that
will be necessary to serve the Santa Nella Community Plan. Based on the Pre‐Design
Study completed in June 2005, this infrastructure will include water distribution
improvements (pipelines, special structures such as the crossing of canals and highways,
and the installation of two pressure‐reducing valves) with preliminary cost estimates of
$9 million.85 A new surface water treatment plant is also planned, for which
preliminary estimates of construction costs range from $15.5 million for a membrane
plant to $21.1 million for a conventional plant.86 The funding for the facilities to serve
the expected development and growth in Santa Nella is planned to come from the sale of
bonds under the Mello‐Roos Community Facilities Act.87
The District has one groundwater well that provides additional water blended with its
treated water used to service some of its commercial customers located along Highway
33, northeast of Interstate 5. This well provides water to lands that are either short on
surface water supplies or are outside the permitted place of use for the San Luis Water
District surface water supplies controlled by Santa Nella, including lands within the Del
Puerto Water District.
With the exception of this one well, the District’s surface water supply is provided by
San Luis from San Luis’ Central Valley Project supply. As a parallel action with the
proposed reorganization, the District will obtain a contract with the Bureau of
Reclamation by assignment of a portion of the San Luis Water District’s Central Valley
Project water service contract, through which it will directly receive the surface water it
currently receives from San Luis. That contract will also provide the District with all of
the pro rata contract water supply that San Luis currently provides to lands within the
Plan area that are being detached from San Luis.
The District’s maximum surface water supply upon completion of the reorganization
and water service contract assignment will be approximately 4,664 acre‐feet, expected to
come from San Luis Water District. This is a maximum allowance subject to annual
reduction by the Bureau of Reclamation. Additional well water is pumped as necessary
to meet the needs of the Del Puerto area, outside of the San Luis District.
83 Personal Communication from District Manager Danny Neville, 24 July 2005.
84 Santa Nella County Water District Master Water Plan, May 1995, 53 and Santa Nella Community Specific
Plan, May 2000, 2‐7.
85 Santa Nella County Water District Water Distribution Facilities Pre‐Design Study, June 2005, 10 – 11.
86 Santa Nella County Water District Surface Water Treatment Plant Predesign Report, June 2005, 8‐5.
87 Santa Nella County Water District Wastewater Treatment Plant Predesign Draft Report, June 2005, 1‐2.
44
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
SNCWD’s raw water supply totaled 144 million gallons in 2004; its treated water
(metered from the distribution center) totaled 97 million gallons in that year. An
additional 47 million gallons were pumped from the District well.88
Historically, the District has received, on average, around 75 percent of municipal water
supply that is allocated by San Luis to the lands within the District. The percentage
available is dependent on drought conditions and varies from year to year.89 In
cooperation with the owners of land within the Specific Plan area, the District is
currently carrying out investigations to provide the additional firm water supplies
needed to serve the area at full buildout. The water supply enhancement projects being
considered include firming of existing supplies through conjunctive use and water
banking agreements, acquisition of the Mercy Springs Water District supplies, purchases
of supplemental supplies from willing sellers within the area, and development of
reclaimed wastewater.
The District will be unable to complete these transactions and projects until the
proposed reorganizations are complete and the District contracts directly with the U.S.
Bureau of Reclamation for water from the Delta‐Mendota Canal of the Central Valley
Project. The financing needed to secure these additional supplies will be provided by
land owners within the Plan area, in a manner that does not increase otherwise
prevailing water rates in the remainder of the District.
Wastewater
SNCWD’s wastewater collection and treatment facilities consist of an aerated
stabilization pond, two combined facultative pond/effluent storage reservoirs, and a
pasture irrigation area. Treated effluent is disposed to pasture land on the treatment
site. (This land has not been seeded or cultivated; vegetation consists primarily of native
grasses.) Stabilized sludge solids accumulate at the bottoms of the facility’s ponds and
will eventually be removed (following completion of the planned new treatment plant
and abandonment of the existing plant) to on‐site soils or an off‐site sanitary landfill.90
The existing facility has a total capacity of 400,000 gallons per day and treats
approximately 300,000 gallons per day on average.91
The current wastewater treatment plant is located on the north side of the San Luis
Wasteway (SLWW) opposite the mobile home park. The Bay View Lift Station, the main
pumping facility for the existing system, is located at the northwest corner of the
intersection of the SLWW and Highway 33.
88 Santa Nella County Water District Water Use Statistics. Some of the District’s raw water is lost in the
treatment process, accounting for the difference between total raw water supply and treated/pumped water.
89 Personal Communication from District Manager Danny Neville, 24 July 2005.
90 Santa Nella County Water District Master Sewer Plan, March 1995, 14.
91 Personal Communication from District Manager Danny Neville, 9 May 2005.
45
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Stoddard & Associates is designing the additional infrastructure that will be required for
development planned in the Santa Nella Specific Plan. This infrastructure will include
an expanded collection system with inverted siphons to be used at the Delta Mendota
Canal and the SLWW crossings. In addition, the installation of reclaimed water
pipelines (to be expanded as Santa Nella develops) will allow the community to dispose
of approximately 1,500 acre‐feet of reclaimed water per year (1.3 mgd), offsetting the
same amount of potable water demand. Preliminary cost estimates for improvements to
the wastewater collection system and reclaimed water distribution system are $7.6
million and $4.0 million, respectively.92
A new wastewater treatment plant will also be necessary. Initial designs have been
planned based on anticipated flows of 2.5 mgd average day flow and 6.25 mgd peak
flow. Auxiliary facilities include a 2,400‐square foot administration building. Initial
staffing requirements are anticipated to be nine employees. Preliminary cost estimates
place construction costs at $26.86 million and annual O&M costs at $910,275. The
funding for the capital facilities to serve the expected development and growth in Santa
Nella are planned to come from the sale of bonds under the Mello‐Roos Community
Facilities Act.93
DEMAND AND CAPACITY
The Santa Nella Specific Plan accommodates significant growth, with 6,483 housing
units, 18,940 residents, and 5.6 million square feet of nonresidential uses at plan
buildout. This represents a major increase from the 1999 Santa Nella population,
estimated at 800 residents living in 350 dwelling units.94 The area’s expected ultimate
land uses will be 60 percent residential, of which 92 percent will be low‐density, 14
percent will be commercial, and 26 percent will be other uses such as schools and open
space.95 At plan buildout, average day water demand is projected to be 4.28 mgd;
projected maximum day demand is 9 mgd, and projected peak hour demand is 8,916
gallons per minute (gpm).96 Minimum storage recommended at buildout is
approximately 4 million gallons.97 Water supply and water and wastewater
infrastructure, described in the preceding sections, will be developed in phases as the
area is developed.
The Specific Plan projects that reclaimed water will meet approximately 17 percent of
total projected water demand. The Specific Plan projected that wastewater flow will
increase from 0.21 mgd in 2000 to 2.2 mgd by plan buildout, requiring sewage disposal
92 Santa Nella County Water District Sewage Collections Facilities Pre‐Design Study, June 2005.
93 Santa Nella County Water District Wastewater Treatment Plant Predesign Draft Report, June 2005.
94 Santa Nella Community Specific Plan, May 2000, 1‐3 and 2‐1.
95 Santa Nella County Water District Sewage Collection Facilities Pre‐Design Study, June 2005, 2.
96 Santa Nella County Water District Surface Water Treatment Plant Predesign Report, June 2005, ES‐1.
97 Santa Nella County Water District Surface Water Treatment Plant Predesign Report, June 2005, 2‐23.
46
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
facilities that can accommodate wastewater flows ten times larger than 2000 levels. The
2005 Pre‐Design Study updates projected demand to 2.5 mgd.98 Existing wastewater
treatment and disposal facilities do not provide opportunities for expansion. As
described above, a predesign study, including a list of potential treatment process
alternatives, has been completed for a new wastewater treatment plant. The District will
be serving as “lead agency” for an Environmental Impact Report being prepared on this
proposed new plant.
As with the water supply improvements, the wastewater system expansion to meet the
needs of the Plan area will be financed in a manner that does not increase otherwise
prevailing wastewater rates in the remainder of the District.
98 Santa Nella County Water District Sewage Collection Facilities Pre‐Design Study, June 2005, 5.
47
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
SNELLING COMMUNITY SERVICES DISTRICT
GOVERNANCE AND OPERATIONS
The Snelling Community Services District (SCSD) was formed in 1974 and provides
wastewater service only.99 It has a service area of approximately 0.75 square miles (480
acres) centered on the community of Snelling. The District’s boundaries are identified in
Figure 12. Its service population is roughly 200 people. The District has a staff of 1.5
full‐time employees (0.5 bookkeeper and two 0.5 operators). Its five‐member Board of
Directors holds meetings the second Monday of each month.100
The District has a FY 06‐07 operating expenditure budget of $69,300, including
approximately $36,000 in funding for “future maintenance.” The District’s revenues
come from wastewater user fees, as well as a small share of property taxes, rents and
leases, and interest income.101
Monthly sewer rates vary widely depending on the type of customer. Single‐family
residences pay $9.69 per unit per month, while commercial rates range from $4.28 per
month for services to a Verizon store to $593 per month for services at the County’s
Henderson Park.102
INFRASTRUCTURE, FACILITIES, AND SERVICES
Wastewater
SCSD serves 115 sewer connections. Its wastewater treatment plant has a maximum
capacity of 60,000 gpd. The District has established a policy that it will not exceed 75
percent of this maximum capacity (45,000 gpd) to ensure that the plant can continue to
function during high spike periods or emergencies. Average usage is 31,000 gpd. In
addition to the wastewater treatment plant, District facilities include piping and a 15‐
acre distribution pond for effluent discharge, of which 7 acres is considered usable.
According to the District, existing facilities are adequate to meet current demand. 103
99 Water in the area is provided through private wells.
100 Interview with Gordon Gray, City of Merced Public Works Dept., 20 Sep. 2006.
101 Snelling Community Services District Rate History, June 30, 2006. (Snelling Community Services
District Sewer Rate Study, July 2006.)
102 Snelling Community Services District Current Utility Rates, June 30, 2006. (Snelling Community
Services District Sewer Rate Study, July 2006.)
103 Interview with Gordon Gray, City of Merced Public Works Dept., 20 Sep. 2006. Gordon Gray, Memo to
John LeVan Re: Infrastructure Development – Snelling, 17 October 2002.
48
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Figure 12 Snelling Community Services District
Sphere of Influence
E
G
N
A
R
G
A
L
KEYES
M
O
N
T
G
O
M E R Y T H IR SNELLING MERCED FALLS
59 D
N
E
L
L
A
ROBINSON
L
A
G
R
OLSEN A
N
GS
EN
E
FIELDLS
L
IN
G
KEYES
Y
R
R
E SNELLING
F
X
ROBINSON
O
C
S
N
YOUD E
L
L IN
M
A ²
G O
5 9 L A
PAL
MERCED
0 0.5 1 2Miles
of Merced County LAFCO RESOLUTION 1065 ON 9/27/1984
49
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
DEMAND AND CAPACITY
Expansion of the SCSD wastewater treatment plant is limited on one side by rock piles
left over from past dredging work and on the other side by a sluice that drains into the
Merced River. Aside from a small number of new connections in infill areas within
existing subdivisions, 35 hook‐ups at the perimeter of existing development represent
the only potential growth in the District’s services.104
104 Interview with Gordon Gray, City of Merced Public Works Dept., 20 Sep. 2006.
50
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
SOUTH DOS PALOS COUNTY WATER DISTRICT
The South Dos Palos County Water District Sphere Report issued in 1984 provides the
only information available on the South Dos Palos County Water District.
GOVERNANCE AND OPERATIONS
The South Dos Palos County Water District was established in 1957 to provide domestic
water and sewage disposal services to the South Dos Palos community. The District
included approximately 285 acres and encompassed the community of South Dos Palos,
an unincorporated community located at the southern edge of Merced County. The
boundaries of South Dos Palos Community Services District are identified in Figure 13.
The District was governed by a 5‐member Board of Directors, which is elected at large
by voters residing in the District.105
INFRASTRUCTURE, FACILITIES, AND SERVICES
Water
In 1984, the District obtained its water from the City of Dos Palos through the Midway
Community Services District’s water system. South Dos Palos formerly had its own
water shortage and delivery system, but the system was closed down due to poor water
quality and maintenance. At this time, the water system served approximately 220
hookups. It was designed to accommodate up to 600 hookups, but the water
distribution system did not provide enough pressure. In order to improve this, the
District was negotiating for a Community Development Block Grant to improve its
water system. The District had plans to upgrade its water system by looping its water
lines and installing larger diameter water pipes.106
For the provision of potable water supplies, the South Dos Palos County Water District
has entered into a Joint Powers Authority (JPA) agreement involving the City of Dos
Palos; Merced County; the Midway Community Services District; and the North Dos
Palos Water District. Due to local groundwater quality limitations, the JPA now obtains
surface water from the California Aqueduct. The water is provided through a surface
delivery system using Central California Irrigation District canals, and is treated at a
plant owned by the JPA and operated by a private firm. The district has an allotment of
capacity from the system as part of the JPA agreement, but landowners within the
district boundary must receive approval directly from the district for water connections.
Monthly billing is paid directly to the City of Dos Palos which in turn reimburses
105 South Dos Palos County Water District Sphere Report, October 1984.
106 South Dos Palos County Water District Sphere Report, October 1984.
51
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
South Dos Palos County Water District
Figure 13
Sphere of Influence
CHRISTIAN AVE
E
V
A
N V E
O A
G
T
S
N L D
XI O
E N
L Y
E
R
GLOBE AVE
SHAIN AVE
T
S T
T HI R
D
O
U R T H
S
T
H S T K ST
J S
T
F FI F
SOUTH DOS PALOS COUNTY WATER DISTRICT
T
T
H
S
M
L
ST
U
R ST
F
O O
ST
T
S
H S T X T H S T N ST
FI F T P S SI N T H
T E
Q ST S E V O ST
H
S T
T
N
AQUA VISTA ST NI E E
V V
A A
N S 3 3 IDA ST
A V
E
SAN
TA FE
G R DXI
N G T
O
E Y
N O L
D
H W
Y
N L E R
O
T SOUTH DOS PALOS
G
N
XI
E
L
²
0 495 990 1,980 Feet
of Merced County
LAFCO Res. No. 1060 10-25-84
52
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
the firm operating and maintaining the treatment plant and water distribution system.
Any funds remaining are returned to the South Dos Palos County Water District. 107
Wastewater
The District’s sewage treatment plant was originally constructed in 1960, and expanded
in 1967. 108 Since the 1984 Sphere Report, the District has abandoned its sewage
treatment plant and has joined into a JPA with the City of Dos Palos and the Midway
Community Services District to receive sewage treatment from a plant operated by the
City.
The district has entered into a JPA involving the City of Dos Palos and the Midway
Community Services District for the provision of sewer service within the districtʹs
boundary. The JPA‐funded sewer plant provides wastewater treatment, and a private
firm is retained by the JPA to operate and maintain the treatment plant and sewer
collection lines within the district territory. The District has an allotment of connections
for remaining capacity, and landowners within the district boundary must receive
approval directly from the district for connections. All monthly billing is paid to the
City of Dos Palos. Through the JPA, the City reimburses the private firm for operations
and maintenance. Any remaining funds are returned to the South Dos Palos County
Water District.
DEMAND AND CAPACITY
In 1984, it was reported that based on historic slow rates of population increase, the
South Dos Palos County Water District was expected to have sufficient water and
wastewater capacity to handle population increases.109
107 Draft Initial Study/Negative Declaration, Merced County and Fresno County Minor Boundary Change,
January 2007.
108 South Dos Palos County Water District Sphere Report, October 1984.
109 South Dos Palos County Water District Sphere Report, October 1984.
53
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
VOLTA COMMUNITY SERVICES DISTRICT
The LAFCO Executive Officers Report regarding the Formation of the Volta Community
Services District, which was issued in 1984, provides the only information available on
the Volta Community Services District.
GOVERNANCE AND OPERATIONS
The Volta Community Services District was formed in 1989. The purpose of the
District’s formation was to acquire a grant for a community water system and to provide
a more predictable water supply. Prior to formation, ground water problems and a high
water table in this vicinity limited the type of industrial and commercial development
which was permitted.110
The application proposed that the District cover the central twelve square blocks of the
Volta Specific Urban Development Plan. A map of these boundaries is shown in Figure
14. In 1988, there were approximately 30 potential existing residential and commercial
connections within the proposed area, and the estimated population for this area was
under 100. Additional connections which may occur should not exceed 9 without the
addition of a community sewage system. It was proposed that the District be funded by
services charges for water service and that the Board of Directors consist of five
members.111
110 Executive Officer’s Report: Formation of the Volta Community Services District, November 1988.
111 Executive Officer’s Report: Formation of the Volta Community Services District, November 1988.
54
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Volta Community Services District
Figure 14
Sphere of Influence
IN
G
O
M
A
R
HENRY MILLER
A
T
L
O
V EXCLUDED
ING
O
M
VOLTA AR
HENRY MILLER AVE
D
R
NVOLTA D T
L R A
LI R ING F L
A L K A
V
E S T E O M AR G RD
D
G E R
V
O L T A
L A
D Y B
R S
A
T
L ²
O
V
LOS BANOS
HWY 152
0 490 980 1,960 Feet
of Merced County
55 LAFCO Resolution No. 0437 12-7-88
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
WINTON WATER AND SANITARY DISTRICT
GOVERNANCE AND OPERATIONS
The Winton Water and Sanitary District (WWSD) was formed in 1952 and provides both
water and sanitary services to the Winton area. The District’s boundaries are identified
in Figure 15. Winton’s population was 8,990 based on the County Housing Element
Data, but this figure is expected to show substantial growth in the next Census. The
District is governed by a five‐member Board of Directors that meets the first and third
Thursday of each month for its regular Board meeting, with a Maintenance Update
meeting held on the second Thursday of each month. The meetings are held at the
District office, 6591 N. Winton Way in Winton. District staff consists of four clerical and
four maintenance personnel.112
Operating expenditures in FY 2006‐2007 total $598,073 for sanitary services and $381,273
for water services. Water expenditures include $40,220 in interest on long‐term debt.113
WWSD has sewer reserve funds of $1.5 million and $765,000 in water reserve funds.114
Water rates differ depending on customer. For a typical ¾” meter, multifamily units
pay $10.95 for the first 1,000 cubic feet (cf) of use, $12.15 for 1,001 to 2,000 cf, $13.50 for
2,001 to 3,000 cf, $15.00 for 3,001 to 4,000 cf, $1.00 per 100 cf for 4,001 to 10,000 cf, $1.50
per 100 cf for 10,001 to 30,000 cf, and $2.00 per 100 cf for 30,001 cf and over. Single‐
family units and duplexes outside the district pay somewhat higher rates. Business,
churches, and other public facilities pay $15.50 for the first 4,000 cf and between $1.00
and $2.00 per 100 cf thereafter. All users pay surcharge fees totaling $4.50. Sewer
charges consist of a $29.00 flat per‐unit rate.115
INFRASTRUCTURE, FACILITIES, AND SERVICES
Water
The Winton Water and Sanitary District provides water services to 2,982 connections. Its
production capacity is about 1,400 gallons per minute from each of its three wells or a
total of 6.05 mgd. Daily average flow is 1.56 million gallons per day. Annual average
usage is 569.28 million gallons. Facilities are considered adequate to meet current needs,
though future growth will require additional infrastructure. 116
112 Interview with Brenda Wey, Winton Water and Sanitary District, 21 Sep. 2006.
113 Winton Water and Sanitary District, Water Budget FY 2006/2007 and Sanitary Budget FY 2006/2007.
114 Interview with Brenda Wey, Winton Water and Sanitary District, 30 Oct. 2006.
115 Winton Water and Sanitary District, Water Rates/Surcharges: Table A. 28 Sep 2006.
116 Personal Communication from Winton Water and Sanitary District, 28 July 2005.
56
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
OLIVE
S E N O J
A N O N MYRTLE D E N T WI E
SI
R U
E S T
N E
WALNUT E G
C A
T
T
O
C
WINTON WATER AND SANITARY DISTRICT
C IN
D
NI A
T
N U T
YR S
O E
F H
CRAWFORD LI C
A
C S S
ALMONDE
R S A P N
Y TA
C FE
GERTRUDE
CAMELLIA
K
E R N A
VI
D
P
R
A
H C R O T A A O NI K GI D A VI R
FRUITLAND
BELLEVUE
FAY
SPPE
ARLENE R A E P
TOKAY
PAIGE
EDEN
DORIS
MANOR
LIBERTY
H
A
E L
W
O
B
N
AI R
PALORA D O O
W
D
E R
SPRUCE A L M P
BUREHC
Winton Water and Sanitary District
Figure 15
Sphere of Influence
OLIVE
A S
R N MINNIES
A
L C T
WI
O L
A
O T AMANDA E BETH C H RI D Y X MEGHAN N E T H NI P E O N
N Y MYRTLE E T T E A E D A N E E R A E R N E T R O PI
E
B
R ROYALTY
RI I
F
L
HALL
P A A B
R
E G
N
VI EGRETE ANTONIO
FAIRLANE RUBI
TOUCAN TOLUCA
ZORARACHEL
LINDSEY RIDGE HASTINGS
Y
E
L
E
K
LOUISE E R BRIDGET B IRVINE
GOLDEN RULE
A
C
NI BOBBIE
O
M
REECE WADE
N
E E
R L L E A C
A A E C P
K
R
O TI MI L Y
K E
R CRESSEY O
B
OREGON R
L A
EI L H
FRUITL W AN IN D TON NE M P O L N U N O N P A R O S S T A C E Y M S C O T T ICHIGAN C E L E S TI A C H A B LI S H A R D O N N A Y M MI T A T IN A Z N A M L A R C H
C U
BIDWELL S
ATWATER FRUITLAND
KOEHN FIESTA MAGNOLIA
FRANKLIN RAINS FALC ON L C R E S T W A T H E N FI F T H ² LOS ALTOS
BRODALSKI L
HI BELLEVUE
CRESTVIEW E D
A R A P
S
IX T H
L IN
D E N
0 0.25 0.5 1Miles
LAFCO RESOLUTION 1053A ON 1/26/95
of Merced County
57
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Wastewater
The District provides wastewater collection services to 2,969 connections; wastewater is
then transported to the City of Atwater Wastewater Treatment Plant for treatment.
WWSD has a wastewater capacity of 1 mgd reserved in the Atwater Wastewater
Treatment Plant and a the District’s actual sewer flow was .71 mgd in September 2006.
As in the case of water, sewer facilities are adequate to meet current needs, but may not
be adequate to serve anticipated future growth.117
DEMAND AND CAPACITY
According to MCAG’s Merced County Population Forecast of March 2004, Winton is
projected to grow from 8,832 in 2000 to 13,900 in 2030, for a total increase of 5,068 (1.9
percent annually).118
Significant housing growth is anticipated in the Winton area, with plans for 261
residential units pending at LAFCO and an additional 87 units likely to come up for
approval in the near future. A new school planned in Winton will also require
approximately 20 connections. The District’s existing water and sanitary facilities, staff,
funding, and water sources are not expected to adequately meet demand associated
with future development. Plans for one new well have already gone through the EIR
and test well stages and a second well is in early planning. Potential expansion of
wastewater service capacity will depend on the outcome of Atwater’s ongoing Sewer
Master Plan. The District is also considering establishing its own wastewater treatment
plant. Facilities expansion will be paid for through District reserve funds. Development
fees may also be considered to help accommodate future growth.119 The Atwater
Wastewater Treatment Plant has approximately 2 mgd of capacity remaining and
Winton would be able to purchase some of this capacity if needed. The City of Atwater
is also studying concepts for future plant expansion which may also provide capacity for
Winton.
117 Personal Communication from Winton Water and Sanitary District, 28 July 2005.
118 MCAG Merced County Population Forecast 2000‐2030, March 2004.
119 Personal Communication from Winton Water and Sanitary District, 28 July 2005. Interview with Brenda
Wey, Winton Water and Sanitary District, 21 Sep. 2006.
58
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
III. DETERMINATIONS
EXPLANATION OF DETERMINATIONS
The Cortese‐Knox‐Hertzberg Local Government Reorganization Act of 2000 requires
LAFCOs to make nine written determinations for municipal service providers. The
following factors120 provide examples of how Merced LAFCO will fulfill the
determination requirement.
Infrastructure Needs and Deficiencies
This determination refers to the adequacy of existing and planned public facilities in
relation to how public services are, and will be, provided to citizens. Infrastructure can
be evaluated in terms of capacity, condition, availability and quality.
Growth and Population Projections
Efficient provision of public services is linked to the ability of service providers to plan
for future need. For example, a water purveyor must be prepared to supply water for
existing and future levels of demand and also be able to determine where future demand
will occur. Municipal service reviews will give LAFCO, affected agencies, and the
public the means to examine both the existing and future need for public services and
will evaluate whether projections for future growth and population patterns are
integrated into an agency’s planning function.
Financing Constraints and Opportunities
LAFCO must weigh a community’s public service needs against the resources available
to fund the services. Service reviews may also suggest innovations for contending with
financing constraints, which may be of considerable value to numerous agencies.
Cost Avoidance Opportunities
The municipal service review will explore cost avoidance opportunities including, but
not limited to, (1) eliminating duplicative services; (2) reducing high administration to
operation cost ratios; (3) replacing outdated or deteriorating infrastructure and
equipment; (4) reducing inventories of underutilized equipment, buildings, or facilities;
(5) redrawing overlapping or inefficient service boundaries; (6) replacing inefficient
purchasing or budgeting practices; (7) implementing economies of scale; and (8)
increasing profitable outsourcing.
120 Excerpted from North County Inland Municipal Service Review and Sphere of Influence Update Study,
San Diego LAFCO, September 2003.
59
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Opportunities for Rate Restructuring
When applicable, the MSR will review varying agency rates, fees, taxes, charges, etc.
within an agency and region to examine opportunities for rate restructuring without
impairing the quality of service.
Opportunities for Shared Facilities
Public service costs may be reduced and service efficiencies increased, if service
providers develop strategies for sharing resources. Sharing facilities and excess system
capacity decreases duplicative efforts, may lower costs, and minimizes unnecessary
resource consumption. Options for plans for future shared facilities and services will
also be considered.
Government Structure Options
The MSR provides a tool to comprehensively study existing and future public service
conditions and to evaluate organizational options for accommodating growth,
preventing urban sprawl, and ensuring that critical services are efficiently and cost‐
effectively provided. LAFCO may examine efficiencies that could be gained through
(1) functional reorganizations within existing agencies, (2) amending or updating SOIs,
(3) annexations or detachments from cities or special districts, (4) formation of new
special districts, (5) special district dissolutions, (6) mergers of special districts with
cities, (7) establishment of subsidiary districts, or (8) any additional reorganization
options found in Government Code § 56000 et. seq.
Evaluation of Management Efficiencies
Management efficiency refers to the effectiveness of internal and external characteristics
of agencies to provide efficient, quality public services. Efficiently managed agencies
consistently implement plans to improve service delivery, reduce waste, eliminate
duplications of effort, contain costs, maintain qualified employees, build and maintain
adequate contingency reserves, and encourage and maintain open dialogues with the
public and other public and private agencies. The service review will evaluate
management efficiency by analyzing agency functions, operations, and practices—as
well as the agency’s ability to meet current and future service demands.
Local Accountability and Governance
Local accountability and governance refers to public agency decision making and
operational and management processes that (1) include an accessible and accountable
elected or appointed decision making body and agency staff; (2) encourage and value
public participation; (3) disclose budgets, programs, and plans; (4) solicit public input
when considering rate changes and work and infrastructure plans; and (5) evaluate
outcomes of plans, programs, and operations, and disclose results to the public.
60
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
BALLICO COMMUNITY SERVICES DISTRICT
The LAFCO Executive Officers Report regarding the Ballico Community Services
District Formation, which was issued in 1984, provides the only information available on
the Ballico Community Services District.
Infrastructure Needs and Deficiencies
No infrastructure needs or deficiencies have been identified.
Growth and Population Projections
Insufficient information to project district growth.
Financing Constraints and Opportunities
No opportunities have been identified, but a reserve existed at the time this MSR was
adopted.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
No opportunities for rate restructuring have been identified.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No opportunities to improve government structure have been identified. The District
has experienced ongoing difficulty maintaining the minimum required three individuals
serving on the Board of Directors.
Evaluation of Management Efficiencies
No opportunities to improve management efficiency have been identified, but
discussions with the County Division of Environmental Health and County Board of
Supervisors have been ongoing.
Local Accountability and Governance
No opportunities to improve local accountability and governance have been identified,
although the County has assisted district efforts to maintain a quorum on the Board of
Directors.
61
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
CELESTE COUNTY WATER DISTRICT
Infrastructure Needs and Deficiencies
CCWD was formed to pay for sewer and water infrastructure on two residential streets.
This infrastructure is adequate to meet demand.
Growth and Population Projections
CCWD includes two residential streets east of the City of Merced. No growth is
anticipated within the District.
Financing Constraints and Opportunities
The District’s payments on a general obligation bond are funded through a special tax,
based on assessed value and set each year at a rate sufficient to pay bond debt for that
year. The District also receives a share of property tax that accrues to its General Fund.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
The District’s payments on a general obligation bond are funded through a special tax,
based on assessed value and set each year at a rate sufficient to pay bond debt for that
year. The District also receives a share of property tax that accrues to its General Fund.
Opportunities for Shared Facilities
District finances are administered by the County Auditor’s office.
Government Structure Options
No changes in CCWD’s governance are pending or proposed.
Evaluation of Management Efficiencies
The district does not provide services or bill customers. Administrative functions are
provided by the County Auditor’s office.
Local Accountability and Governance
CCWD has no Board of Directors and does not provide services or bill customers.
62
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
COUNTRY CLUB COUNTY WATER DISTRICT
The LAFCO Executive Officers Report regarding the Formation of the Country Club
County Water District, which was issued in 1982, provides the only information
available on the Country Club Water District.
Infrastructure Needs and Deficiencies
No infrastructure needs or deficiencies have been identified.
Growth and Population Projections
Insufficient information to project district growth.
Financing Constraints and Opportunities
No opportunities have been identified.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
No opportunities for rate restructuring have been identified.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No opportunities to improve government structure have been identified.
Evaluation of Management Efficiencies
No opportunities to improve management efficiency have been identified.
Local Accountability and Governance
No opportunities to improve local accountability and governance have been identified.
63
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
DELHI COUNTY WATER DISTRICT
Infrastructure Needs and Deficiencies
Water
The water system infrastructure including the water mains and well sites that were in
place in 2004 were not considered sufficient to serve future demand. In order to
accommodate growth, the system required construction of four new wells and a grid of
12‐inch pipes spaced at about a ½ mile.
Wastewater
In 2004, system improvements required upgrades of existing sewer trunk lines, force
mains, lift stations, and upgrades to the District’s wastewater treatment plant.
Specifically, lift station upgrades that would increase the pumping capacity of stations 1,
4, and 5 were necessary. Also, three new lift stations, four new trunk lines, and a new
force main needed to be constructed.
Growth and Population Projections
MCAG 2004 population projections estimate that Delhi will grow from 8,022 people in
2000 to 17,500 in 2020 (average annual growth of 4.0 percent) and to 21,300 by 2030
(average annual growth of 3.3 percent).
Financing Constraints and Opportunities
No opportunities have been identified.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
No opportunities for rate restructuring have been identified.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No opportunities to improve government structure have been identified.
Evaluation of Management Efficiencies
No opportunities to improve management efficiency have been identified.
64
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Local Accountability and Governance
No opportunities to improve local accountability and governance have been identified.
65
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
FRANKLIN COUNTY WATER DISTRICT
Infrastructure Needs and Deficiencies
FCWD operates a wastewater treatment plant and two lift stations. It is in the planning
process to upgrade its plant and is preparing to install an additional regional lift station.
District staff state that facilities are adequate to serve current demand; planned upgrades
will help meet serve anticipated growth and may be paid for through development fees.
Growth and Population Projections
Recent MCAG population forecasts project that the Franklin Beachwood area will
experience a population increase of approximately 2.4 percent annually between 2000
and 2010, and between 2000 and 2030, for a total population of 7,100 people by 2030.
There are approximately 250 acres of prospective residential development waiting to be
annexed to the District.
Financing Constraints and Opportunities
The District’s total operating budget in FY 2006‐2007 is $910,000, including $8,500 in
debt service. Reserves total $210,000.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
FCWD charges a flat monthly rate ranging from $19 to $23 depending on location. Once
the cost of planned capital improvements has been determined, the District may
establish development fees to cover the cost of upgrades.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No changes in FCWD’s governance are pending or proposed.
Evaluation of Management Efficiencies
The District appears to operate efficiently.
Local Accountability and Governance
FCWD has a five‐member Board of Directors that holds public meetings on the second
Monday of each month.
66
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
HILMAR COUNTY WATER DISTRICT
Infrastructure Needs and Deficiencies
HCWD has both water and wastewater treatment and distribution infrastructure. The
Community Plan currently being prepared for Hilmar anticipates that future growth
will require the construction of two new wells and an additional storage tank, as well as
expansion of the wastewater treatment facility. Capital facilities fees are currently in
place to fund infrastructure required by new development.
Growth and Population Projections
MCAG projects that the Hilmar community will grow from 4,807 in 2000 to 9,500 in
2030, a total increase of nearly 4,700, or 3.3 percent annually. The District has prepared a
facilities overview for the growth proposed in the County’s ongoing Community Plan
update for Hilmar. The growth population considered in the facilities overview is a
maximum of 12,000.
Financing Constraints and Opportunities
The District’s total proposed operating expenses for FY 2006‐2007 are $911,000. Reserves
total $2.3 million and come primarily from development fees.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
HCWD uses a two‐tiered rate system. Domestic water rates are $18.50 for the first
30,000 gallons, $1 per 1,000 gallons from 30,000 to 40,000 gallons, and $2 per 1,000
gallons thereafter, on a 30‐day billing cycle. Commercial rates are the same, except that
any usage over 80,000 gallons is charged at a rate of $1.10 per 1,000 gallons. Sewer rates
consist of a $17 flat fee for residential customers and a $17 per unit flat fee, plus $1.50 per
1,000 gallons of measured water in excess of 10,000 gallons for commercial customers.
Capital facilities fees are charged to cover infrastructure required by new development
and are updated annually.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No changes in FCWD’s governance are pending or proposed.
Evaluation of Management Efficiencies
The District appears to operate efficiently.
67
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Local Accountability and Governance
HCWD has a five‐member Board of Directors that holds public meetings on the first
Tuesday of each month.
68
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
LE GRAND COMMUNITY SERVICES DISTRICT
Infrastructure Needs and Deficiencies
LGCSD provides water from groundwater wells and maintains wastewater facilities
including a lift station and a treatment plant. The District states that existing facilities
are adequate to meet current demand. Two additional wells will be necessary to serve
anticipated development in six subdivisions; it is expected that these wells, along with
one to two possible lift stations, will be built by developers and dedicated to the District.
Other facilities improvements may be paid for through developer fees.
Growth and Population Projections
According to MCAG’s March 2004 Population Forecast for Merced County, the
population of the Le Grand area is projected to grow by 1.2 percent annually between
2000 and 2030, increasing from 1,760 to 2,400 during that period. The District has issued
“can and will serve” commitments on 358 lots in a total of six subdivisions; development
of these subdivisions would increase the demand for LGCSD services and require
additional infrastructure. In addition, annexations to the District totaling 50 acres are
currently being contemplated and could expand LGCSD’s service area.
Financing Constraints and Opportunities
The District’s total operating expenses for FY 2006‐2007 are $349,425. The total
operating expenses include $186,672 in the water fund and $162,753 in the sewer fund.
Non‐operating expenses for sewer service include $19,000 in interest on long‐term debt.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
The District should consider metering if customers are currently unmetered to
encourage conservation. Current rates are under review.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
Various annexations to the District are currently being contemplated. These include an
annexation of 30 acres on the District’s west side, an annexation of 10 acres in support of
a development proposal for “Yosemite Ranch Estates” on the southeast side of the
District, and a “housekeeping” annexation of 10 acres acquired by the local high school
and already accommodated by an amendment to the County’s Urban Growth Boundary
for the area. These annexations may occur as part of a single process.
69
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Evaluation of Management Efficiencies
The District appears to operate efficiently.
Local Accountability and Governance
LGCSD has a five‐member Board of Directors that holds public meetings on the first
Thursday of each month.
70
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
MIDWAY COMMUNITY SERVICES DISTRICT
The Midway Community Services District Sphere Report, which was issued in 1984,
provides the only information available on the Midway Community Services District.
Infrastructure Needs and Deficiencies
No infrastructure needs or deficiencies have been identified.
Growth and Population Projections
Insufficient information to project district growth.
Financing Constraints and Opportunities
No opportunities have been identified.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
No opportunities for rate restructuring have been identified.
Opportunities for Shared Facilities
The District shares sewer and water facilities as part of a Joint Powers Authority with
the City of Dos Palos, the North Dos Palos Water District, and South Dos Palos County
Water District.
Government Structure Options
No opportunities to improve government structure have been identified.
Evaluation of Management Efficiencies
No opportunities to improve management efficiency have been identified.
Local Accountability and Governance
No opportunities to improve local accountability and governance have been identified.
71
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
NORTH DOS PALOS WATER DISTRICT
The North Dos Palos Water District Sphere Report, which was issued in 1984, provides
the only information available on the North Dos Palos Water District.
Infrastructure Needs and Deficiencies
No infrastructure needs or deficiencies have been identified.
Growth and Population Projections
Insufficient information to project district growth.
Financing Constraints and Opportunities
No opportunities have been identified.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
No opportunities for rate restructuring have been identified.
Opportunities for Shared Facilities
The District shares water treatment and delivery services through a Joint Powers
Authority with the City of Dos Palos, Midway Community Services District, and South
Dos Palos County Water District.
Government Structure Options
No opportunities to improve government structure have been identified.
Evaluation of Management Efficiencies
No opportunities to improve management efficiency have been identified.
Local Accountability and Governance
No opportunities to improve local accountability and governance have been identified.
72
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
PLANADA COMMUNITY SERVICES DISTRICT
Infrastructure Needs and Deficiencies
Water is supplied to PCSD customers from five groundwater wells and is conveyed
through a pressurized water system. Wastewater facilities include two lift stations,
which use a gravity collection/main lift system to move sewage to the wastewater
treatment plant. The District is currently in the CEQA phase of a proposal to expand the
treatment facility and increase the capacity of the system. According to the Planada
Community Plan, funding for capacity expansion will come from connection fees or the
requirement by PCSD that large developments provide a new community well when
necessary; the Community Plan also cites grant funds as a potential funding source.
Growth and Population Projections
The Planada Community Plan, finalized in December 2003, anticipates a buildout
population of 8,500. Although the time period of the Community Plan is through 2015,
the Plan text notes that the population could reach 8,500 before that point depending on
the local economy and housing market.
Financing Constraints and Opportunities
Total operating expenses budgeted for FY 2006‐2007 are approximately $888,970. This
includes $442,985 for water and $445,985 for sewer. PCSD has $108,000 in reserve
deposits, which are evenly divided between water and sewer.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
The District’s rates are currently $33 per month for ¾ inch water service and $28 per
month for sewer service.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No changes to the governance of PCSD are pending or proposed.
Evaluation of Management Efficiencies
The District appears to operate efficiently.
73
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Local Accountability and Governance
PCSD has a five‐member Board of Directors that holds public meetings on the second
Tuesday of each month.
74
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
SANTA NELLA COUNTY WATER DISTRICT
Infrastructure Needs and Deficiencies
The District will require specific new infrastructure to serve the development
anticipated in the Santa Nella Community Plan. Completion of a reorganization to place
all Specific Plan lands within its service area is required before such infrastructure can
be implemented and development permitted to connect with District facilities.
Stoddard & Associates is designing the additional infrastructure that will be required.
At plan buildout, average day water demand is projected to be 4.28 mgd, projected
maximum day demand is 9 mgd, and projected peak hour demand is 8,916 gpm.
Growth and Population Projections
As discussed above, the Santa Nella Community Plan is expected to bring significant
growth, including approximately 6,500 residential units and over 5 million square feet of
nonresidential development. This growth will be served by the planned infrastructure.
The time frame anticipated in the Community Specific Plan assumes an approximate 20‐
year period to reach buildout of the Plan.
Financing Constraints and Opportunities
The District obtains funds for water operations and maintenance through rates set
annually. Currently the District and developers are working on financing mechanisms
for the required infrastructure, which will likely include a combination of special tax
assessments to fund bonds and connection charges. This information will be available
prior to processing individual annexations into the District.
Cost Avoidance Opportunities
No opportunities for cost avoidance have been identified at this time. However, the
proposed reorganizations may reduce the overhead costs created by the existence of
overlapping local water agencies and will ensure that one entity will be capable of
planning, owning and operating all water and wastewater facilities needed to serve the
Santa Nella Specific Plan area.
Opportunities for Rate Restructuring
The District’s payment schedule is currently single‐tiered. It should consider adjusting
the schedule to one that is multi‐tiered in order to encourage water conservation.
Opportunities for Shared Facilities
No opportunities for Shared Facilities have been identified at this time. The MSR
recommends that the District take over full supply of the water needed to serve growth
outlined in the Santa Nella Community Specific Plan.
75
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Government Structure Options
The District and the San Luis Water District have agreed to reorganize the two public
districts pursuant to the Reorganization Act so that all land within the Santa Nella
Community Plan area will be within the boundaries of Santa Nella and no land within
the Plan area will be within San Luis. To implement the reorganization, the District will
also need to get a federal contract with the Bureau of Reclamation. Some additional
annexations and detachments will occur to avoid the creation of islands and to make
other minor changes in the agencies’ boundaries. In addition, Del Puerto and CCID
lands that are within the Specific Plan area will be detached from Del Puerto and CCID
and annexed to the District. Water for these areas will be provided by water from the
Mercy Springs Water District and supplemental supplies acquired by the District. The
reorganization will not affect either Del Puerto’s or CCID’s existing water supply, or
their operations as agricultural water purveyors.
Evaluation of Management Efficiencies
No changes to the management of the District are pending or proposed.
Local Accountability and Governance
The District is governed by an elected board, with staggered terms. No changes to the
accountability or governance of the District are pending or proposed.
76
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
SNELLING COMMUNITY SERVICES DISTRICT
Infrastructure Needs and Deficiencies
District facilities include one wastewater treatment plant with a maximum capacity of
60,000 gpd, as well as a distribution pond for effluent discharge. Expansion of this
treatment plant is limited by the surrounding geography.
Growth and Population Projections
Aside from new connections in infill areas within existing subdivisions, 35 hook‐ups at
the perimeter of existing development represent the only growth anticipated by the
District.
Financing Constraints and Opportunities
The District has a FY 06‐07 operating expenditure budget of $69,300, including
approximately $36,000 in funding for “future maintenance.”
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
Monthly sewer rates vary widely depending on the type of customer. Single‐family
residences pay $9.69 per unit per month, while commercial rates range from $4.28 per
month to $593 per month.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No changes to governance are pending or proposed.
Evaluation of Management Efficiencies
The District appears to operate efficiently.
Local Accountability and Governance
The District is governed by a 5‐member Board of Directors that holds meetings the
second Monday of each month.
77
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
SOUTH DOS PALOS COUNTY WATER DISTRICT
The South Dos Palos County Water District Sphere Report issued in 1984 provides the
only information available on the South Dos Palos County Water District.
Infrastructure Needs and Deficiencies
No infrastructure needs or deficiencies have been identified.
Growth and Population Projections
Insufficient information to project district growth.
Financing Constraints and Opportunities
No opportunities have been identified.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
No opportunities for rate restructuring have been identified.
Opportunities for Shared Facilities
The District shares sewer and water facilities as part of a Joint Powers Authority with
the City of Dos Palos, Midway Community Services District, and North Dos Palos Water
District.
Government Structure Options
No opportunities to improve government structure have been identified.
Evaluation of Management Efficiencies
No opportunities to improve management efficiency have been identified.
Local Accountability and Governance
No opportunities to improve local accountability and governance have been identified.
78
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
VOLTA COMMUNITY SERVICES DISTRICT
The LAFCO Executive Officers Report regarding the Formation of the Volta Community
Services District, which was issued in 1984, provides the only information available on
the Volta Community Services District.
Infrastructure Needs and Deficiencies
No infrastructure needs or deficiencies have been identified.
Growth and Population Projections
Insufficient information to project district growth.
Financing Constraints and Opportunities
No opportunities have been identified.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
No opportunities for rate restructuring have been identified.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No opportunities to improve government structure have been identified.
Evaluation of Management Efficiencies
No opportunities to improve management efficiency have been identified.
Local Accountability and Governance
No opportunities to improve local accountability and governance have been identified,
although the County has assisted in efforts to maintain a quorum on the District’s Board
of Directors.
79
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
WINTON WATER AND SANITARY DISTRICT
Infrastructure Needs and Deficiencies
WWSD has three wells, from which it provides water services to 2,798 connections. It
provides wastewater services to approximately the same number. According to District
staff, the District’s existing water and sanitary facilities, staff, funding, and water sources
are adequate to meet current demand but are not expected to adequately meet demand
associated with future development. Plans for one new well have already gone through
the EIR and test well stages, and a second well is in early planning. In the long term, the
District hopes to eventually establish its own wastewater treatment plant. Facilities
expansion will be paid for through District reserve funds and development fees.
Growth and Population Projections
According to MCAG’s Merced County Population Forecast of March 2004, Winton is
projected to grow from 8,832 in 2000 to 13,900 in 2030, for a total increase of 5,068 (1.9
percent annually). Significant housing growth is anticipated in the Winton area, with
plans for 261 residential units pending at LAFCO and an additional 87 units likely to
come up for approval in the near future. A new school planned in Winton will also
require approximately 20 connections.
Financing Constraints and Opportunities
Operating expenditures in FY 2006‐2007 total approximately $598,073 for sanitary
services and $381,273 for water services. WWSD has sewer reserve funds of $1.5 million
and $765,000 in water reserve funds.
Cost Avoidance Opportunities
No cost avoidance opportunities have been identified.
Opportunities for Rate Restructuring
Water rates differ depending on customer type. For a typical ¾” meter, multifamily
units pay $10.95 for the first 1,000 cubic feet (cf) of use, $12.15 for 1,001 to 2,000 cf, $13.50
for 2,001 to 3,000 cf, $15.00 for 3,001 to 4,000 cf, $1.00 per 100 cf for 4,001 to 10,000 cf,
$1.50 per 100 cf for 10,001 to 30,000 cf, and $2.00 per 100 cf for 30,001 cf and over. Sewer
charges consist of a $29.00 flat per‐unit rate.
Opportunities for Shared Facilities
No opportunities for shared facilities have been identified.
Government Structure Options
No changes to Winton’s governance are pending or proposed.
80
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc
Final Report
Water and Sewer Service Providers Municipal Service Review
As Approved by LAFCO May 24, 2007
Evaluation of Management Efficiencies
The District appears to operate efficiently.
Local Accountability and Governance
WWSD is governed by a five‐member Board of Directors that holds public meetings on
the first and third Thursday of each month, with a Maintenance Update meeting held on
the second Thursday of each month.
81
P:\15000s\15029mercedlafco\Report\15029_FinalRpt8.doc