LAFCO
Dos Palos MSR
Read the report at Local Agency Formation Commissions ↗
Final Report
City of Dos Palos
Municipal Service Review
Prepared for:
Merced County Local Agency Formation Commission
Prepared by:
Economic & Planning Systems, Inc.
in association with
Berkson Associates
As approved by LAFCO on December 13, 2017
by Resolution No. 2017-2.
EPS #151046
Table of Contents
1. INTRODUCTION ...................................................................................................... 3
Background and Purpose .......................................................................................... 3
Approach and Methodology ...................................................................................... 4
Reorganization and Service Issues ............................................................................. 4
Projected Growth and Development ........................................................................... 5
Fiscal Conditions ..................................................................................................... 9
City of Dos Palos Governance ................................................................................... 9
2. POLICE DEPARTMENT ............................................................................................. 11
3. FIRE DEPARTMENT ................................................................................................ 12
4. STORM DRAINAGE ................................................................................................ 14
5. WATER ............................................................................................................. 15
6. SEWER .............................................................................................................. 17
7. DETERMINATIONS ................................................................................................. 18
List of Figures
Figure 1 City of Dos Palos General Plan Map .................................................................... 7
Figure 2 City of Dos Palos Sphere of Influence ................................................................. 8
Figure 3 Organizational Chart ...................................................................................... 10
1. INTRODUCTION
This Draft Report updates the Municipal Service Review (MSR) prepared for the City of Dos Palos
in 2010.1 The MSR presents revised findings and conclusions along with updated research. This
MSR addresses the City of Dos Palos and includes the required data and analysis linked to
organizational issues facing the City.
Dos Palos is located 23 miles south-southwest of Merced and its incorporated city limits
encompass 1.49 square miles.2 In general, issues involved in this MSR include the City’s
potential annexation of unincorporated territory into the City, and the City’s ability to provide
adequate and efficient governmental services for existing and future residents.
Background and Purpose
In 1997, the State Legislature convened a special commission to study and make
recommendations about how to accommodate California’s rapidly accelerating growth. The
Commission on Local Governance for the 21st Century focused on empowering the already
existing County LAFCOs governed by the Cortese-Knox Local Government Reorganization Act of
1985. The Commission’s final report, Growth within Bounds, recommended various changes to
local land use laws and LAFCO statutes to allow LAFCOs more influence in shaping California’s
growth. Assembly Speaker Robert Hertzberg encompassed the recommendations of the
Commission in Assembly Bill 2838, which passed into the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000. The law endows LAFCO with both more responsibilities
and more influence to direct growth in California.
One of LAFCO’s responsibilities requires preparation of municipal service reviews (MSRs) prior to
or in conjunction with reviews of city and district spheres of influence (SOIs). Government Code
Section 56425 directs LAFCOs to review and update agencies’ SOIs, as necessary. Section
56430 requires MSRs to be conducted before or in conjunction with the sphere updates. The
Local Government Reorganization Act requires that this MSR address the following factors:
1. Growth and population projections for the affected area
2. The location and characteristics of any disadvantaged unincorporated communities within or
contiguous to the sphere of influence
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies including needs or deficiencies related to sewers,
municipal and industrial water, and structural fire protection in any disadvantaged,
unincorporated communities within or contiguous to the sphere of influence
4. Financial ability of agencies to provide services
5. Status of, and opportunities for, shared facilities
1 City of Dos Palos Municipal Service Review, Final Report as Approved by LAFCO March 25, 2010.
2 Dos Palos (City) QuickFacts, United States Bureau.
Economic & Planning Systems, Inc. 3 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
City of Dos Palos Municipal Service Review
December 2017
6. Accountability for community service needs, including governmental structure and
operational efficiencies
7. Any other matter related to effective service delivery, as required by commission policy
Approach and Methodology
Economic & Planning Systems, Inc. (EPS) has been retained by LAFCO to update the MSR for the
City of Dos Palos in Merced County. EPS reviewed the various plan documents provided by
LAFCO and City staff, the City’s current budget, the prior MSR document, and other readily
available information to prepare this Report. The Report presents a summary of service issues
and trends, and provides details of each service in subsequent sections of the report. The seven
State-mandated issue areas are reviewed for each service category examined in the Report and
presented in Chapter 7.
Reorganization and Service Issues
The prior 2010 MSR identified a number of issues. Following is a summary of the current status
or resolution of those issues.
1. Land Use Planning
The City of Dos Palos General Plan was adopted in 1991, and the Housing Element was updated
in 2003, and the City is overdue for submittal of the State Department of Housing and
Community Development 5th planning period update. Although the City was considering an
update to the General Plan in 2010, it has yet to complete the update due to ongoing financial
constraints.3 The current document pinpoints areas identified for future development, which are
a combination of areas to the south and west of the community.4 Other areas are identified as
having development potential; however, the City is focusing on those areas with some
development and infrastructure in place, already served with City water and sewer services,
rather than predominantly agricultural lands. The outcome of the planning process may
influence future service provision, especially any desire to annex land to the east which was
formerly part of Fresno County.
2. Contract Service Provision
In April 1988, the City entered into the “Water Quality Improvement Joint Powers Agency for the
Dos Palos Area” for the City provision of potable water supplies to five other agencies and the
“Wastewater Disposal Joint Powers Agency for the Dos Palos Area” for the City provision of sewer
service to three other agencies. In addition to the City, the Water Quality Joint Powers Authority
(JPA) involves Merced County, Midway Community Services District, North Dos Palos Water
District, and South Dos Palos County Water District. The Wastewater Disposal JPA involves the
City, the Midway Community Services District and the South Dos Palos County Water District.
3. Future Infrastructure Funding
Although the City of Dos Palos is currently charging development impact fees (fire, park, police,
storm drainage, traffic, wastewater, and water), the fees have not been updated since 1991. The
3 Provided by returned initial data request, May 2017.
4 City of Dos Palos General Plan, 1991.
Economic & Planning Systems, Inc. 4 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
City of Dos Palos Municipal Service Review
December 2017
fees have also not been adjusted for inflation. No update for the fees are in progress, however,
studies to increase infrastructure fees may be considered as funding becomes available. In
addition to potential development impact fee updates, the City is applying to State and Federal
programs to support infrastructure funding.
4. Future Growth
The City of Dos Palos experienced the fastest growth rate in Merced County for the 2011 to 2016
time period at 7.6% based on State Department of Finance data (an increase of 380 people).
The second fastest growth rate was in nearby Los Banos which grew by 7.25% over the same
period.
The City’s current General Plan identifies growth areas to the south and west. Other areas are
identified as having development potential; however, the City is focusing on those areas with
some development and infrastructure in place, already served with City water and sewer
services, rather than predominantly agricultural lands.5
In 2007, the boundary between Merced and Fresno Counties was modified through the
annexation of 6.5 square miles into Merced County located southeast of the Dos Palos city limits.
This area would now qualify for annexation although it is not reflected in the City’s current
General Plan or sphere of influence. As mentioned in the 2010 MSR, the City should update their
General Plan to indicate plans for future growth and annexation given this County boundary
change.
5. Sphere of Influence Amendment
During the 2017 MSR update effort, it was discovered that the City’s 39 acre sewage treatment
plant site located west of town on Swift Road was never reflected in the City’s sphere of influence
or city limit maps by LAFCO, even though it was annexed into the City in 1975. Therefore,
following adoption of this MSR Update, the Commission should approve a sphere of influence
amendment to include this territory within the sphere as reflected in Figure 2.
Projected Growth and Development
The City of Dos Palos is responsible for the full range of municipal services and provides storm
drainage services as well as police, fire, and general government services. As mentioned earlier,
the City entered into the Water Quality Improvement Joint Powers Agency for the Dos Palos
Area” for the provision of potable water supplies and the “Wastewater Disposal Joint Powers
Agency for the Dos Palos Area” for the provision of sewer service to other districts and a portion
of unincorporated Merced County east of the City.
The City of Dos Palos is located in western Merced County near the Fresno County border along
State Route 33. The existing jurisdiction covers approximately 954 acres or 1.49 square miles.
See Figure 1 for the City of Dos Palos General Plan map. The City of Dos Palos’ General Plan
encompasses the City and the unincorporated communities of Midway and South Dos Palos.6
The City’s Sphere of Influence is shown in Figure 2.
5 City of Dos Palos General Plan, 1991.
6 Storm Drainage Master Plan for the City of Dos Palos, September 2009.
Economic & Planning Systems, Inc. 5 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
City of Dos Palos Municipal Service Review
December 2017
The majority of the land in Dos Palos consists of residential development. The areas identified
for future development in the General Plan are primarily in agricultural use to the east and
northwest, and contains partially developed and fallow land to the southwest within the
boundaries of the Midway Community Services District and the South Dos Palos County Water
District.7
The City of Dos Palos had a population of approximately 5,400 people in January 2017,
increasing approximately 1 percent annually from 2009.8 According to MCAG, the City of Dos
Palos is projected to have a population of approximately 5,600 by 2020, although annexation of
the existing Midway and/or South Dos Palos communities would add more population based on
existing development.9 In 2060, the City is projected to have a total population of 8,900. 10
The General Plan had a time horizon of 2010 with an estimated buildout population of 12,476
(including anticipated annexation of the Midway and South Dos Palos Communities) and
projected City growth. Updated population projections and corresponding land use needs would
be components of a general plan update effort.”
7 City Review, August 31, 2017.
8 California Department of Finance, 2009 and 2017.
9 The 2010 MSR estimate was based on the assumption that the City would be able to annex Midway
and South Dos Palos.
10 Merced County Association of Governments, Growth Projections, 2016.
Economic & Planning Systems, Inc. 6 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
SERPILIO ST E V A R FI
E
V A L
O
R A C
ALMOND ST
PALO ALTO ST
VALERIA ST
VALERIA AVE
PLUM ST
STEARMAN ST
CHRISTIAN AVE
FORECASTDR
E V A
R E P O O C
SHAINAVE
T S H T
F
FI
L ST
M T ST S
H T R
U O F N
ST
EVA
NOSREHPCM
K ST
E
V A
L
L
E
S
S
U
R
EVA
TRAGGATCM
EVA
YBMUM
EVA
NOSNHOJ
MERCED ST
SANTARITAST
DORA ST
E
V
A
E N
IK
S R
E
BLOSSOM ST
E V
A A
R
E
D
A
M
ELI CT
P
ST
EVA
SIRRAH
OLIVE ST
T S H
T X SI
EVA
GNILWOB
E V A
D
R
A
N
O
E L
TIPTON DR
TC
TEDAC
CARMELLIA AVE
STOCKING ST
A
N
G
L
E
A
V
E
GEORGE ST
E
V
A
R
FI
E
V A
M
L
A
P
LORAINEST
E
SHARONLN SANTOS ST
A
V
K N
A R F E V
A
N SAN ROBERTO ST O
A A V E N O R T E V
R
NI A
N O N LI F Y L
A
T C S
T E V E E T A V N E R A B E N N PI N E
N
OHAYES ST
C
E V A X U L L IM
M
C
OAKST D
O
N A
L
D
MCKENZIE ST A V
E E
V A
T
U N
L A
W
JUNIPER ST MCINTYRE ST
T
C
D
O
O
W
SKINNER ST
E V A
R O
T A
IV A SPAIN ST
E
V A N
O L N A H
T
S
H
T
H
Q
ST EI
G
EVA
NOSLIW
E
V
A
S
O
L
A
P
S
O
D
E
V A
E S O
N
J MERCED ST
A S
OLIVER ST
MARGUERITE ST
BLOSSOM ST
V E PALO ALTO ST
A L
E
B A M E V A IDA ST N N Y L
JONES ST
GEIS ST
E
V
A S IR
R O
E M
V A M U
T
A T
T S
R
T H J ST
U O F
O ST
T
S
H
T
F
FI
T
S
H
T N
NI
EVA
REVEDIN
E
V A
N
O
T
S
E
L
G
G
E
THOMAS ST
E V
A
E
E
G
C
M
COLE ST
E
V A S
E L IM
T
S
D R HI
T
T
S
H T
N
E
V
E
S
T S
H
T
N
E
V
E
S O
ST
EVA
KNARF
E V A
N
E V A
S O D
T L
G O
N N
IX Y
E E
L R
E
V D
A R
Y E
E C
A U B
R
V E
NI
IONE ST
LINDENST
OLIVER ST
E
V
A
L
L E
MARGUERITE ST H C
T
MI
E E A V V A
A O
M E S R E N
ALMONDST
S
A V E
E
D F E R N A V E
E
N E R A L A V E A L L E Y N E A V E K A T H Y A V E
L
U C E R N E A V E
D R G
L O N
E Y NYLANDER ST
R
E V A A NI GI R VI
WILLOW ST MCGINTY ST
E
V A
N
O
T
G
N XI
E MCCURDY ST
L
CHRISTIAN AVE
A V E S CIR
E D R N UI M O S Q M A
H
SANTA
FE
GRD W A
Y
Y
T
NI
U
M
M
O
C
AQUAVISTAST
DOS
PALOS
RD
EVA
RETNEC
EVELYNLN
E V A
R
E T N E C
E V A E T
A
G
N
E
D
L
O
G
|þ}
·
33
E A V E N A V GI E L M E U H
E
V A
M O S L
O
F
E
V
A
LI
E
GLOBEAVE
E
V A
X
U
L
L
MI
E
V
A
M
O
S
L
O
F
Legend
City Limit Line
CITY OF DOS PALOS .
General Plan
LDR - Low Density Residential (R1-10) CBD - Central Business District (C-1) LI - Light Industrial
MDR - Medium Density Residential (R-1) CGS - Commercial General Service (C-2) HI - Heavy Industrial
Merced Data
MHDR - Medium-High Density Residential (R-2) CT - Commercial Transition PU - Public Use/School GENERAL PLAN
Special Services, Inc.
HDR - High Density Residential (R-3) CN - Commercial Neighborhood Parks/Open Space 500 250 0 500 1,000Feet
369 W. 18th Street
AG/G - Greenbelt / Ag PUD - Planned Unit Development
September 10, 2012
Merced, Ca 95340
(209) 723-3153
FAX (209) 723-0322
SPHERE OF INFLUENCE AMENDMENT MAP
for the
CITY of
DOS PALOS
in
Merced
County MERCED COUNTY
GIS
dxm.7102
62 90
solaP
soD
tibihxE
IOS RSM 7102\SIG\etadpU
RSM
7102\solaP
soD
fo
ytiC\seitinummoC
detaropocnI\OCFAL\SIG\atad\:G
:htaP
tnemucoD
Merced
EUCALYPTUS
County
Inset
Map
Y
E M
R
R L
B E A
U
T
^_P
A N
Dos
E
C Palos
CARMELLIA
T
F GEORGE I
W
IONE
S E
K T Dos Pa SH l A o RONs N G A MERCED
A
R N OLIVER
F E
N D
O A O BLOSSOM L
T S R O
G E E S G
L E X I N M N Y N O L D C A R O L A R E D VALERIA IDA
E A
S A R M
N
T
A
F E SPAIN
CHRISTIAN
E
L
I
GLOBE
X
M SHAIN U
K J O L
S L
M L O L M I
O
F
N
QP
D
O 3
S 3
PA
L
O
S
MERRILL
SOI Boundary
Proposed SOI
Amendment Area
0 1,750 3,500 7,000
Feet
Date: 9/27/2017
City of Dos Palos Municipal Service Review
December 2017
Fiscal Conditions
The City of Dos Palos operates under an adopted balanced General Fund budget of $1.17 million
for FY 2017/18. Since 2015/16, the total budget has increased approximately 3 percent from
$3.4 million to $3.5 million. Of the total budget, approximately 62 percent of revenues come
from utility bills including water, sewer, and refuse. Sales and property taxes make up 21.6
percent of the total revenues. Police makes up the highest annual cost at 23 percent of total
budget expenditures and 70 percent of General Fund expenditures.
City of Dos Palos Governance
The City of Dos Palos was incorporated May 24, 1935 as a General Law City, under the California
Government Code and the Constitution of the State of California. The City is governed by a
Council-Manager form of government with five elected council members, one of whom is elected
by the public as mayor. The mayor serves a four-year term, council members serve four-year
terms. The council selects the City Manager who is also the chief executive officer and police
commissioner for the city.11
City of Dos Palos Contact Information
Darrell Fonseca, City Manager
(209) 392-2174
2174 Blossom Street
Dos Palos, CA 93620
city@dospalos.org
11 Provided by returned initial data request, May 2017.
Economic & Planning Systems, Inc. 9 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
2017 City of Dos Palos Officials
28th Mayor APRIL HOGUE
Mayor pro Tem ALICE THOMPSON
Councilmember JOE LERNER
Councilmember MICHAEL McGLYNN
Councilmember THOMAS PIGG
City Attorney Edward Amaral
City Engineer Garth Pecchenino
City Treasurer Lori L. Lima
Independent Auditor James M. Stofle, CPA
City Manager/CEO/PC DARRELL FONSECA
PUBLIC SAFETY FINANCE & PERSONNEL POLICE/Animal Control
Director Dewayne Jones Director Manuela Sousa Chief Barry Mann
Lori Winters
Building Tracy Mosby Police Officers
Lisa Areias
Planning Commission Melisa Gutierrez
Chair John Gamboni Cliff Battles
Ron Tucci PUBLIC WORKS/Parks John Taylor
David Castillo Director Michael Smith Gerardo Chavez
Cindy Enriquez Gordon Bonds Johnny Mathis
Jason Teeter
Recreation Ramiro Gamino Dispatch
Becky Navarro Will Steele Supervisor Kathy Mathis
Travis Jones Jessica Hammerslough
Felicia Hernandez
Paid Call Firefighters UTILITIES/Water-Wastewater Brandy Randol
John McCarthy Director Rick Marshall Danielle Vause
Dave Jordan Ignacio Cervera
Michael Bryant Bobby Martinez Reserve Officers
Martin Meraz Steven Choi
Anthony Figeroa Jose Ramos
Sean Davis Jorge Zaragoza *
Ray Echavarria Emanuel Beccera
Eulisis Gutierrez Rob Peladeau
Chris Zuspan *will serve as paid contract reserve until Officer Taylor returns
City of Dos Palos Municipal Service Review
December 2017
2. POLICE DEPARTMENT
The Police Department employs seven sworn officers, five reserve officers, and five dispatchers
(four part-time and one full-time employee).12 The department headquarters is housed in the
City-County Building at 1546 Golden Gate Avenue in Dos Palos. Both Fire and Police dispatch
units include recording systems utilizing 911-enhanced calling, and the systems are linked with
county emergency services for efficient delivery and backup.
In 2009, the City purchased a former bank branch building and moved its City Hall operations to
the new location. As a result, the Police Department located in the back of the City-County
Building was expanded within the building to include the front office. The Police Department
tripled its footprint at the City-County Building and now includes a street-facing Police lobby, a
double bay state of the art dispatching center, a 911 Tech equipment room, a supervisor’s office,
a briefing room, a staff break room, a chief’s office, an exercise room, two evidence rooms, and
several smaller storage rooms.13
Since 2010, the City added an officer by obtaining a COPS Grant to fund an additional position.
The grant has since expired and the City is now bearing the full cost of the extra position. In
2010, the City had six officers and a population of 4,950 which results in 1.2 officers per 1,000
residents. 14 With a seven percent increase in population, the ratio has increased to 1.3 sworn
police officers per 1,000 residents, still exceeding the City’s policy of 1 officer per 1,000
residents.15 A typical service standard in an urban setting can range from 1.0 to 1.5 sworn offers
per 1,000 residents.
Currently, the majority of police costs are funded through the City’s General Fund. In December
1991, the City adopted a residential development impact fee of $100 per unit and has not been
updated since. However, due to the low growth rate, Police Impact Fees would generate little
funding given the small size of Dos Palos. Other funding options would include special state
funding. The Department has requested $2.0 to $4.0 million in state funding with State Senator
Anthony Canella shepherding the process. The Department also looks forward to applying for
Federal or State COPS funding in the future. In 2016, the Department received $24,000 in RAND
Technology and will be applying the upcoming years.
12 2017 City of Dos Palos Officials.
13 Per LAFCO interview with Darrell Fonseca, City of Dos Palos.
14 City Review, October 2017.
15 Per LAFCO interview with Darrell Fonseca, City of Dos Palos.
Economic & Planning Systems, Inc. 11 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
3. FIRE DEPARTMENT
The Fire Department provides fire protection and emergency medical service to areas within the
City of Dos Palos. Currently, the City of Dos Palos operates the Fire Department with ten paid per
call firefighters.16 The Fire Chief reports to the City Manager and to the elected City Council. The
City Council approves the Fire Department’s budget annually. For FY 2017/18, the Fire
Department’s budget is estimated to be $32,000, a 40 percent decrease from the last
assessment in 2008/09.17
The Dos Palos area is protected by two fire stations: Dos Palos Fire Station 76, located at 1540
Golden Gate Ave, and Dos Palos Wye Fire Station 75, located at 8047 W, Dairy Lane.18 The City
shares Station 76 with Merced County while the Dos Palos Wye Station is operated by Merced
County. Since the 2010 MSR, the City of Dos Palos and Merced County Fire updated the concrete
pad on one Engine Apparatus bay.
The Dos Palos Fire Department, under a contract with CAL FIRE has the equivalent of one 24-
hour firefighter, supported by ten “paid per call” firefighters funded by the City. In addition, the
Fire Department has an Automatic Aid agreement with the Fresno County fire Protection District
and Merced County to provide fire protection services. 19
In 2016, the Dos Palos Fire Department responded to 596 calls for service in the city limits, an
increase of 37 percent from 2008. The Dos Palos Fire Station responded to 1,148 calls for service
in 2016 and 554 calls for service in the County Response Area. Response time within the city
limits is generally within three to five minutes.20 In 2011, Dos Palos earned an ISO rating of 4.21
Dos Palos is also served by a countywide emergency response system, including ambulance
service. The cities of Dos Palos, Los Banos, and Gustine are dispatched by the county command
center in Mariposa.
16 Provided by returned initial data request, May 2017.
17 City of Dos Palos Fiscal Year 2017/18 Budget.
18 http://www.co.merced.ca.us/BusinessDirectoryII.aspx?lngBusinessCategoryID=26.
19 Fire protection service is defined as firefighting capacity to contain, control, extinguish structure
fires, and responses to unknown type fires, priority one and two medical emergencies, and special call
emergency incidents. Source: Agreement for Fire Protection Services between Fresno County Fire
Protection District and County of Merced, April 26, 2005.
20 Provided by returned initial data request, May 2017.
21 ISO collects information on municipal fire-protection efforts in communities throughout the United
States. In each of those communities, ISO analyzes the relevant data using its Fire Suppression Rating
Schedule. Then, a Public Protection Classification between 1 and 10 is assigned. Class 1 generally
represents superior property fire protection, and Class 10 indicates that the area's fire-suppression
program doesn't meet ISO’s minimum criteria. Source: Ibid.
Economic & Planning Systems, Inc. 12 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
City of Dos Palos Municipal Service Review
December 2017
Although the Department is collecting Fire Development Impact Fees, no updates or increases in
fees are in progress. However, the Current City Council has indicated a willingness to consider
fee increases. Staff intends to study this issue during 2017 and bring the information for council
consideration later in the year.22
22 Ibid.
Economic & Planning Systems, Inc. 13 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
4. STORM DRAINAGE
The City of Dos Palos operates the storm drainage system in coordination with the Dos Palos
Drainage District (DPDD) and the Central California Irrigation District (CCID).23 The City of Dos
Palos, DPDD, and CCID operate together to provide storm drainage service within the City’s
sphere of influence.24 The City pays the Dos Palos Drainage District to operate three area pumps
as needed to reduce the area’s high water table as needed. The recent drought reduced the need
significantly. The City’s General Plan encompasses the communities of Midway and South Dos
Palos. The City and the Central California Irrigation District (CCID) formed an agreement
regarding drainage service provision in August 1988.25
The City’s storm drainage system comprises multiple small networks that drain into a canal that
is owned and operated by the CCID. The City pays the CCID to accept the City’s Storm Drainage
runoff into their irrigation canal system. Based on the existing system layout and flow paths, the
Dos Palos area is divided into individual drainage sub-basins. The storm water runoff from each
of these areas is either collected and pumped into a nearby canal, flows to a nearby ditch, or has
no existing storm water collection/storage system.26 Specifically, many developed areas in the
older portions of the communities of Dos Palos, Midway and South Dos Palos do not have a
drainage system. As development in these areas increases, the City will need to expand the
storm drainage system to serve these areas. Since the last MSR, there have been major changes
and improvements to the City’s storm drainage system. Prior to 2010 many of the City’s streets
frequently flooded with even moderate rainfall. Since 2010, the City built two new pumping
stations, added a large collection basin, replaced single pump station with two or three pump
stations at nine new locations. Collection backups now occur within only two conjunction
locations and only after several days of continuous rainfall.27 In addition, storm drainage fees
have not been increased or adjusted by an inflation factor. 28
23 Provided by returned initial data request, May 2017.
24 Ibid.
25 City of Dos Palos Storm Drainage Master Plan, prepared by Fremming, Parson, and Pecchenino,
September 2009. Section 1.1.
26 Ibid. Section 1.1.
27 City Review, August 31, 2017.
28 Ibid.
Economic & Planning Systems, Inc. 14 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
5. WATER
For the provision of potable water supplies, the City of Dos Palos has entered into the “Water
Quality Improvement Joint Powers Agency for the Dos Palos Area” (JPA) agreement involving
Merced County; the Midway Community Services District; the North Dos Palos Water District and
South Dos Palos County Water District.29 The purpose of the JPA is to establish a common water
supply and delivery system for participating agencies relying on surface water from the California
Aqueduct. The water is delivered to the City by a 20-inch, 17.5-mile pipeline, and is treated at a
plant and operated by the City’s Utilities Department. The City, each district and the County have
an allotment of capacity from the system as part of the JPA agreement, but landowners within
the district boundary must receive approval directly from the City, respective district, or County
for water connections. Monthly billing is paid directly to the City of Dos Palos, which operates and
maintains the water treatment plant and water distribution system. 30
Due to the recent drought, the quality of water provided from the California Aqueduct varied as
the quantity of water from the California Aqueduct was reduced. Water was supplied instead
from the San Luis Reservoir which was low at the time and very high in organics. At one point
its algae clogged both the City’s intake screens and the plant’s filtration system. Congressman
Jim Costa was able to arrange to have the Aqueduct intake screens cleaned. The City Manager
and City Engineer were able to obtain almost $300,000 in State grant money to replace the
entire filtration system.31
From time to time, the increased algae levels forced the City’s plant treatment process to exceed
acceptable levels of THM’s (Trihalomethanes). With increased rainfall, water quantity has
improved in the California Aqueduct. Water quality has shifted from problems of algae to silt.
With the extreme runoff, fine silt is found in the Aqueduct. This problem has been treated;
however, the water briefly exceeded State turbidity levels. The plant is currently passing all
State acceptance levels.32
The City is currently utilizing 60 to 75 percent of its allotted water capacity from the Aqueduct
depending on the time of year, and has consistently had one of the Valley’s best water
conservation rates since 2013.33 The City, along with its JPA partners, is looking to build a new
water plant to meet new state standards. The current water plant is near capacity. Once the
29 Joint Exercise of Powers Agreement Providing for Water Supply Delivery System from the California
Aqueduct, April 26, 1988. The agreement was modified in 2010 to replace the County of Fresno with
the County of Merced as a party following the County boundary change effective in 2008.
30 Draft Initial Study/Negative Declaration, Merced County and Fresno County Minor Boundary
Change, January 2007.
31 Provided by returned initial data request, May 2017.
32 Ibid.
33 Ibid.
Economic & Planning Systems, Inc. 15 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
City of Dos Palos Municipal Service Review
December 2017
remaining vacant lots in the City are built, the City’s allotment of the treatment plant will reach
peak capacity. 34
Although the City has a current water connection fee, it also looks towards other funding
mechanisms.35 In late 2016, the City was awarded a $500,000 State Drinking Water planning
grant to prepare for a new water plant, drill test wells for possible water blending, and study the
best method of plant treatment to meet new state standards. Separately, the City was notified
by the (Federal) U.S. Department of Agriculture that it was eligible for a $4 million loan and $2
million grant toward a new water plant. Although funding availability may be subject to Federal
political decisions, the City does not believe it can handle taking on such a large debt as a new
water plant is estimated to cost approximately $8 million. The City intends to proceed with its
State grant compliance and efforts to make it eligible for a 100% State Grant as a disadvantaged
community to build a new water treatment plant. 36 This was again verified on August 31, 2017
by State of California Water officials reviewing the City’s State Drinking Water Planning Grant
compliance.
Although the Water Distribution System Study in 2007 recommended construction of water lines
and three new pumping stations, the City has since assessed that only one new pumping station
is necessary for maximum pressurization at the most distant location (near South Dos Palos.)
The City is currently preparing a planning grant application to achieve funding for replacement of
water distribution lines.37
34 Ibid.
35 City of Dos Palos Development Impact Fee Schedule, 1991.
36 Provided by returned initial data request, May 2017.
37 Provided by returned initial data request, May 2017.
Economic & Planning Systems, Inc. 16 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
6. SEWER
The City entered into the “Wastewater Disposal Joint Powers Agency for the Dos Palos Area”
(JPA) involving the Midway Community Services District and the South Dos Palos County Water
District for the provision of sewer service since 1990.38 The City provides the JPA and its
members with sewer collection and wastewater treatment. The JPA reimburses the City for
operations and maintenance of their respective sewer and wastewater services.
The existing sewer system is comprised of sewer lines with diameters between 4 and 15
inches.39 There are seven lift stations that help convey the wastewater to the WWTF for
processing. The WWTF is located on the west side of Swift Road, on a 39 acre parcel within the
City limits, but discontiguous from the City limits approximately one mile to the west. For the
most part, the existing sewer lines and lift stations are adequate for flows at the present time.
The current average daily flow to the facility is about 500,000 gallons per day (gpd), or 0.5 MGD.
The maximum capacity of the wastewater treatment facility is 0.77million gallons per day.40
Expansion capacity can be doubled with the addition of two new large-berm post treatment
basins (earth moving construction). All post treatment water is available and used onsite for
non-edible agricultural farming.
The City’s Wastewater Collection System Study reports that for the most part, the existing sewer
lines and lift stations are adequate given current flow levels. The South Dos Palos sewer mainline
that runs from South Dos Palos along Lexington Avenue to the Lexington Lift Station is flat and
has experienced flow problems due to low usage. The JPA has provided funding for sulfide
treatments to assist the South Dos Palos district. Since the last MSR, upgrades were made to
the Lexington Lift Station at a cost of approximately $300,000 and the Aeration Basin of the
Wastewater Treatment Facility was upgraded in 2011.41 In addition, lines on Marguerite Street
and on Almond Street have been replaced with increased flow size. The City Engineer and City
Manager are working with Self Help Enterprises on a planning grant to achieve funding for
replacement of sewer collection lines.42 Wastewater fees have not been updated since the last
MSR, however, a study to increase facility fees will be considered as funding becomes available
to conduct a study.
38 Joint Exercise of Powers Agreement Providing for Wastewater Treatment and Disposal Systems,
February 8, 1990.
39 The sewer material in the older part of town is mostly vitrified clay pipe (VCP) with some plastic
pipe. Pipe materials used in the last 20 years include VCP and polyvinyl chloride pipe (PVC). Source:
Wastewater Collection System Study for the City of Dos Palos, prepared by Fremming, Parson, and
Pecchenino, May 2007, Section 3-1.
40 Wastewater Collection System Study for the City of Dos Palos, prepared by Fremming, Parson, and
Pecchenino, May 2007. Section 3-3.
41 Provided by returned initial data request, May 2017.
42 Provided by returned initial data request, May 2017.
Economic & Planning Systems, Inc. 17 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
7. DETERMINATIONS
1. Growth and Population Projections for the affected area
Although the City has grown slower than projected in the 2007 MCAG estimations, the most
recent projections (2016) estimate that Dos Palos will have a projected population in 2020 of
5,600. 43
2. The location and characteristics of any disadvantaged unincorporated
communities within or contiguous to the sphere of influence
Dos Palos has three disadvantaged unincorporated communities contiguous to its sphere of
influence. Dos Palos “Y” is located in southern Merced County, approximately four miles north of
the City of Dos Palos at the junction of Highway 152 and Highway 33. It is approximately 35
acres. It has its own water service provided by low capacity wells. North Dos Palos is located in
southern Merced County, situated on the northern city limit line of the City of Dos Palos,
adjacent to Highway 33. Its boundaries are W. Carmellia Avenue to the south, Reynolds Avenue
to west, and Palm Avenue to the east. The DUC encompasses approximately 141 acres and is
provided water service from Joint Powers Agreement with two additional districts, Merced County
and the City of Dos Palos, to receive potable domestic water. Unincorporated Community #5 is
located in central Merced County, approximately 0.75 mile south of Dos Palos “Y” and is
approximately 8 acres in size. Its boundaries are the Arroyo Canal to the north, Highway 33 to
the east, and the Paso Slough Drain to the west. Unincorporated Community #5 has individual
private wells to serve its residents. All three of these communities rely on individual septic
systems and receive fire service from the Merced County Fire Department.44 In addition, the
neighboring unincorporated Communities of Midway and South Dos Palos, which each correspond
with the boundaries of their respective urban service special districts, are also identified as DUCs.
These two communities are located within the City’s sphere of influence, while the other three
communities referenced above are not.
3. Present and planned capacity of public facilities, adequacy of public services,
and infrastructure needs or deficiencies including needs or deficiencies related to
sewers, municipal and industrial water, and structural fire protection in any
disadvantaged, unincorporated communities within or contiguous to the sphere of
influence
Currently, the City believes it only requires one new water pumping station for maximum
pressurization near South Dos Palos. A new surface water treatment plant is also needed, and
the City, working with the Water Quality Improvement Joint Powers Authority (JPA), is pursuing
funding through a 100% State Grant as a disadvantaged community (DAC) for its construction.
Replacement of water distribution lines and sewer collection lines are also needed. Growth will
likely require the addition of staff for a variety of City services.
43 Merced County Association of Governments, Growth Projections, 2016.
44 2030 Merced County General Plan, Adopted July 12, 2016.
Economic & Planning Systems, Inc. 18 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
City of Dos Palos Municipal Service Review
December 2017
As mentioned earlier, the City in its role with the Water Quality Improvement JPA intends to
build a new water treatment plant through efforts to make it eligible for a 100% State Grant as a
disadvantaged community (DAC). DACs are classified by communities with an annual median
household income (MHI) that is less than 80 percent of the Statewide annual MHI (PRC Section
75005(g)). Through operation of both the “Water Quality Improvement” JPA and “Wastewater
Disposal” JPA, the disadvantaged communities within the City sphere receive the same level of
sewer and water service as the city residents. Similarly, with the mutual aid arrangement for fire
protection and the shared Fire Station No. 76 with Merced County, the unincorporated fringe
areas of the City receive comparable structural fire protection service.
4. Financial ability of agencies to provide services
In 2014, the Dos Palos Police Department expanded from six to seven officers by obtaining a
COPS Grant to fund the additional position. However, the grant has since expired and the City is
now bearing the full cost of the extra position. The City has requested $2 to $4 million in special
state funding. The City will continue applying for Federal or State COPS funding and RAND
Technology funds. As for financing for Water Utilities, the City was awarded a $500,000 State
Drinking Water Planning grant to prepare for a new water plant. The City was also notified from
the Federal Department of Agriculture that it is eligible for a $4.0 million loan and $2.0 million
grant towards a new water plant.
Despite collecting fire, park, police, storm drainage, traffic, wastewater, and water development
impact fees, the fees have not been updated since 1991 or adjusted for inflation. Staff intends to
study this issue during 2017 and will bring information to the Council for consideration. These
development impact fees should be revised continuously to assure rates are consistent with
changes in costs.
5. Status of, and opportunities for, shared facilities
No new opportunities for shared facilities have been identified; however, the City has a long
history of achieving efficiencies in service delivery through their shared Fire Station 76 with the
County, and through the regional water and wastewater JPAs with the neighboring Midway
Community Services District, the South Dos Palos County Water District, the North Dos Palos
Water District and Merced County.
6. Evaluation of Local Accountability, Government Structure, and Operational
Efficiencies
No issues have been identified relating to local accountability, government structure, and
operational efficiencies. Although the City has only recently experience some growth since the
previous MSR, the City is able to maintain a balanced budget and maintain staffing levels.
7. Accountability for community service needs, including governmental structure
and operational efficiencies
The City’s website should be updated with staff contacts. Currently, only department heads are
listed and the viewer is directed to contact City Hall as a central one stop shop. Budget
documents are also lacking, but the City indicated that they will provide more detail in the next
fiscal year. In addition, the existing budget structure lacks description and narrative detail for the
public. Other means of transparency on the website should include documents such as the City’s
General Plan.
Economic & Planning Systems, Inc. 19 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx
City of Dos Palos Municipal Service Review
December 2017
When possible, the City should complete its Housing Element Update and obtain approval from
the State Department of Housing and Community Development in order to obtain affordable
housing grants and similar benefits. Similar to earlier comments regarding completing a
comprehensive update to the 1990 General Plan, the City should seek grant and other creative
funding sources to complete the Housing Element update.
8. Any other matter related to effective service delivery, as required by
commission policy
No other matters have been identified at this time.
Economic & Planning Systems, Inc. 20 P:\151000s\151046MercedLafco\Report\Admin Drafts\DosPalos\DosPalosReport_Final_2017.docx