LAFCO
Le Grand-Athlone Water District MSR
Read the report at Local Agency Formation Commissions ↗
Final Report
LeGrand-Athlone Water District
Municipal Service Review
Prepared for:
Merced County Local Agency Formation Commission
Prepared by:
Economic & Planning Systems, Inc.
in association with
Berkson Associates
EPS #171107
September 2018
As approved by LAFCO on September 20, 2018
This MSR is incorporated by reference in the Agricultural
Irrigation Service Providers Municipal Service Review dated
October 23, 2008.
Table of Contents
1. INTRODUCTION ...................................................................................................... 1
Background and Purpose .......................................................................................... 1
Approach and Methodology ...................................................................................... 2
2. DISTRICT BACKGROUND ........................................................................................... 3
Governance and Operations ...................................................................................... 5
Projected Growth and Development ........................................................................... 7
3. WATER SERVICE REVIEW .......................................................................................... 9
Existing Supply, Usage, and Delivery ......................................................................... 9
Future Growth and Related Demand ........................................................................ 10
Infrastructure and Facilities .................................................................................... 10
Other Potential Actions to Meet Demand ................................................................... 11
4. FINANCIAL REVIEW ............................................................................................... 12
Fiscal Conditions ................................................................................................... 12
5. DETERMINATIONS ................................................................................................. 15
List of Figures and Tables
Figure 1 Sphere of Influence Boundaries of LGAWD .......................................................... 4
Figure 2 Potential Annexation and District Service Area (Improvement District) Map ............. 8
Table 1 LGAWD Board and Other Contact Information...................................................... 6
Table 2 Historic Rates, Charges, and Acre Feet/Year Delivered ........................................ 13
1. INTRODUCTION
In 2008, Economic & Planning Systems (EPS) provided Merced LAFCO with an Agricultural
Irrigation Service Providers Municipal Service Review (MSR).1 The study contained limited
historic information and budget data for the LeGrand-Athlone Water District (LGAWD/District).
LGAWD's current application for an expansion of its sphere of influence and annexation of
approximately 5,800 acres requires an update of the last Municipal Service Review (MSR)
prepared in 2008.2
This Draft Report presents new and revised findings and conclusions along with information
about LGAWD's proposed expansion. This MSR specifically addresses the LGAWD and includes
data, analysis and findings required by State law.
Background and Purpose
In 1997, the State Legislature convened a special commission to study and make
recommendations about how to accommodate California’s rapidly accelerating growth. The
Commission on Local Governance for the 21st Century focused on empowering the already
existing County LAFCOs governed by the Cortese-Knox Local Government Reorganization Act of
1985. The Commission’s final report, Growth within Bounds, recommended various changes to
local land use laws and LAFCO statutes to allow LAFCOs more influence in shaping California’s
growth. Assembly Speaker Robert Hertzberg encompassed the recommendations of the
Commission in Assembly Bill 2838, which passed into the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000. The law endows LAFCO with both more responsibilities
and more influence to direct growth in California.
One of LAFCO’s responsibilities requires preparation of municipal service reviews (MSRs) as
required by Government Code Section 56430 before or in conjunction with reviews of city and
district spheres of influence (SOIs). The Local Government Reorganization Act requires that this
MSR address the following factors:
1. Growth and population projections for the affected area
2. The location and characteristics of any disadvantaged unincorporated communities within or
contiguous to the sphere of influence
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies including needs or deficiencies related to sewers,
municipal and industrial water, and structural fire protection in any disadvantaged,
unincorporated communities within or contiguous to the sphere of influence
4. Financial ability of agencies to provide services
1 County of Merced Agricultural Irrigation Service Providers Municipal Service Review, Final Report as
Approved by LAFCO on October 23, 2008.
2 Engineer’s Report Proposition 218 Procedures for Benefit Assessments, LeGrand-Athlone Water
District, October 2017.
Economic & Planning Systems, Inc. 1 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
5. Status of, and opportunities for, shared facilities
6. Accountability for community service needs, including governmental structure and
operational efficiencies
7. Any other matter related to effective service delivery, as required by commission policy
Approach and Methodology
LAFCO retained Economic & Planning Systems, Inc. (EPS), in association with Berkson Associates
to update the MSR for the LGAWD in Merced County. EPS reviewed various plan documents
provided by LAFCO and District staff, LGAWD’s current budget, the prior MSR document, and
other readily available information to prepare this Report. The Report presents a summary of
service issues and trends and provides details of each service in subsequent sections of the
report. Chapter 5 includes the State-mandated determinations.
Economic & Planning Systems, Inc. 2 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
2. DISTRICT BACKGROUND
LGAWD, formed in 1964, provides surface water for farmland irrigation in a portion of the County
of Merced. In addition, according to the legislation enabling the District's formation, the District
also has the unauthorized latent powers to provide drainage service, generate and distribute
electric power, reclaim wastewater, provide sewage disposal, and construct and operate
incidental recreational facilities. The District is located near the southeastern corner of Merced
County, and most of the District is located between Santa Fe Avenue and Highway 99. The
community of LeGrand is located to the north of the District’s northern boundary.3 The Sphere
of Influence boundaries of LGAWD are identified in Figure 1.
The District is a member of the Merced Subbasin Groundwater Sustainability Agency (GSA) Joint
Powers Authority (JPA), which is one of three Groundwater Sustainability Agencies for the
Merced Groundwater Subbasin. One of the primary reasons for District expansion is to assure
that local farmers have the opportunity to be represented and engaged in decisions and actions
of the Merced Subbasin GSA/JPA. The District's expansion also improves the financial base to
support participation and service improvements.4
3 Engineer’s Report Proposition 218 Procedures for Benefit Assessments, LeGrand-Athlone Water
District, October 2017.
4 David Orth, Data Request Follow-Up, January 31, 2018.
Economic & Planning Systems, Inc. 3 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
Figure 1 Sphere of Influence Boundaries of LGAWD
Economic & Planning Systems, Inc. 4 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
Governance and Operations5
A Board of Directors consisting of five members governs the LGAWD (see Table 1), each of
whom are long-time landowners within the District. While all board seats are presently filled,
future vacancies will be filled either by an election of landowner votes under the California
Uniform District Election Law or appointed by the remaining board members in accordance with
Government Code §1780, as applicable. In addition to the board members, the board appointed
a District secretary who also handles the District’s bookkeeping.6 The Board meets on the third
Thursday of each month and an agenda is prepared before the meeting. All agendas are
reviewed by the District’s legal counsel for Brown Act compliance.7 In addition, legal counsel
typically attends board meetings to ensure Brown Act compliance. Many requirements of the
Brown Act are included in the District’s amended and restated bylaws, which have been
approved by the Merced County Board of Supervisors 8 and recorded in Merced County.
Currently, the District has no plans to build a website, but may consider it in the future. The
District is a member of the Merced Subbasin GSA JPA.9
Contact Information
Consultant to District
David Orth, Principal, New Current Water and Land, LLC
(559) 289-2181
625 West Cromwell, Suite 101
Fresno, CA 93711
dorth@newcurrentwater.com
District Contact
Brad Robson, President, LGAWD Board of Directors
2958 Trovare Court
Merced, CA 95340
bradrobson@yahoo.com
5 Ibid.
6 The position is currently held by Lori Ringeisen, CPA.
7 The Ralph M. Brown Act, located at California Government Code 54950 et seq., is an act of the
California State Legislature, authored by Assembly member Ralph M. Brown and passed in 1953, that
guarantees the public's right to attend and participate in meetings of local legislative bodies.
8 Pursuant to Government Code section 87306, LeGrand-Athlone Water District has submitted their
amended Conflict of Interest Code to the Board of Supervisors for approval. The Board of Supervisors
Office is responsible for review of the Conflict of Interest Code(s) of all Special Districts and the filing
of documents with Fair Political Practices Commission (FPPC).
9 www.mercedsgma.org
Economic & Planning Systems, Inc. 5 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
Table 1 LGAWD Board and Other Contact Information
Contacts Position Email Address Term
Board Members
Brad Robson LGAWD Board Member bradrobson@yahoo.com 2958 Trovare Court, Merced
2015-2018
Bill Bright LGAWD Board Member bb06262000@gmail.com 5246 S. Plainsburg Road, Le Grand
2014-2018
Kole Upton LGAWD Board Member kupton@inreach.com P.O. Box 506, Chowchilla
2016-2020
David Serrano LGAWD Board Member dave@serranofarms.com 9901 E. Buchanan Hollow Road, Le Grand
2016-2020
Dario Giampaoli LGAWD Board Member n/a 4530 S. Minturn Road, Le Grand
2016-2020
Lori Ringeisen, CPA LGAWD Board Secretary lorir@loriringeisencpa.com 216 Robertson Blvd., Suite B, Chowchilla
n/a
Other District Contacts
Brian Ehlers District Engineer behlers@ppeng.com 3341 M Street, Merced
n/a
David Orth Principal, New Current Water and Land, LLC DOrth@newcurrentwater.com 652 West Cromwell Avenue, Suite 101, Fresno
n/a
Source: LGAWD
Economic & Planning Systems, Inc. 6 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
Projected Growth and Development
Currently, the District contains 118 property owners and approximately 23,700 acres. As
previously mentioned, the LeGrand-Athlone Water District anticipates expanding the District’s
boundaries in connection with a pending annexation application of approximately 5,800 acres.
The annexation is projected to add 14 properties to the existing 118 property owners within the
District.10 Figure 2 shows the potential expansion through annexation to the LGAWD and the
current 11,000-acre “Improvement District” territory in relation to the overall District boundary.
This Figure also identifies the present boundaries of the Merced Irrigation District and Chowchilla
Water District spheres of influence where the proposed annexation properties are located.
The district is located in a rural area of Merced County designated for “Agricultural” uses in the
General Plan. There is no urban development planned, and no planned increase in population
except for housing for landowners and farmworkers on rural parcels. The District does not
propose to provide potable water.
10 David Orth, Data Request Follow-Up, January 31, 2018.
Economic & Planning Systems, Inc. 7 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
Figure 2 Potential Annexation and District Service Area (Improvement District) Map
Economic & Planning Systems, Inc. 8 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
3. WATER SERVICE REVIEW
Existing Supply, Usage, and Delivery
Water Supply
The LeGrand-Athlone Water District currently purchases surplus irrigation water from the Merced
Irrigation District (MID) when available. The MID provides irrigation water to Eastern Merced
County's agricultural community using water from the Merced River, which flows through
Yosemite National Park. Currently, there is one canal-to-canal connection between the District
and the MID through the Fancher system.11 At the end of the canal, the District installed a 42’’
pipeline which directs water into Deadman Creek, Dutchman Creek, and other canals. This water
is then accessed by a portion of the District’s landowners and customers within an “improvement
district” area serving approximately 11,000 acres and 20 customers. In 2011, the District
provided its peak delivery with approximately 7,700 acre feet of surface water from 2009 to
2017. However, this is largely dependent on MID’s supply in any given year as the supply is
considered excess water when MID has more than adequate supplies for serving farmland within
their district boundary. The District hopes to add additional customers to the system as surface
water becomes available from the MID. While the District does not deliver its own groundwater,
it estimates that total groundwater extractions by landowners within the District’s boundaries are
approximately 50,000 to 60,000 acre feet per year.12
Water Usage and Demand
In 2016, the California Department of Water Resources designated the Merced Subbasin as
“critically overdrafted.”13 Based on the jurisdictional boundaries of the Merced Subbasin, there is
reason to believe that the District's groundwater sources are also overdrafted. As a result, the
District believes it would benefit from more imported surface water to address overdraft
conditions. Currently, daily surface water usage peaks at 60 acre feet and averages
approximately 40 acre feet. However, not all landowners in the District currently have access to
the District’s facilities and thus do not have access to a supply of surface water.14 At the same
time, other landowners obtain MID surface water from other conveyance facilities and the District
does not receive any revenue from this usage (See Table 2 in Section 4 of this MSR).
As of 2018, the Merced Subbasin Groundwater Sustainability Agency (GSA) is studying the
specific amount of current and projected overdraft in the basin as part of its Groundwater
Sustainability Plan (GSP). Presently, the District estimates there is a demand for 50,000 to
60,000 acre feet per year of ground water, and the Merced Subbasin has an annual supply of
11 The Fancher lateral also receives storm water discharge.
12 David Orth, Data Request Follow-Up, January 31, 2018.
13 Groundwater Basins Subject to Critical Conditions of Overdraft Prepared by California Department
of Water Resources for Bulletin 118, Interim Update 2016.
14 David Orth, Data Request Follow-Up, January 31, 2018.
Economic & Planning Systems, Inc. 9 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
28,000 acre feet per year. The resulting overdraft within the Merced Subbasin based on these
estimates approximate 22,000 to 32,000 acre feet per year.215
Water Delivery
Water deliveries completely depend on when excess surface water is made available by MID.
When excess surface water is made available, the District contracts for the allotment on a year-
to-year basis to purchase available water. While water deliveries have been sporadic, the water
is typically attainable during the months of May through October.16
Future Growth and Related Demand
The District does not anticipate any additional growth or demand for commercial or agricultural
uses of water. The District’s activities are geared to preserving the existing amount of water
used by District landowners as a result of the restrictions anticipated to be put in place when the
Merced Subbasin GSA/JPA adopts a GSP in coordination with the two other GSAs within the
Subbasin. As mentioned above, due to declining groundwater levels, it is believed that
groundwater resources are not adequate to meet future groundwater demand from existing
landowners. There are plans to accommodate this demand through the investigation of
purchasing additional volumes of surface water in abundant water years, and through
conservation and other actions to be identified in the future GSP. 17 The current land uses in the
5,800 acre proposed District expansion area involve cultivated agriculture, orchards and grazing
lands which are non-irrigated or irrigated by groundwater wells. These properties are within the
Merced Irrigation District and the Chowchilla Water District spheres of influence, but are not
within the respective district boundaries and receive no district water supplies.
Infrastructure and Facilities
Existing Facilities and Infrastructure
Currently, the District has 4,300 feet of water main pipelines with no wells, tanks, or pump
stations. As mentioned above, this water main is connected through the 42’’ pipeline directing
water from the MID Fancher system to the District. The pipeline has an existing capacity of 30
cubic feet per second (CFS). The District’s immediate efforts are directed to improving this
connection to allow for the importation of greater amounts of surface water from MID than has
historically occurred. In addition, the District has an easement for its pipeline and owns a parcel
consisting of 8 acres for recharge purposes.18
Infrastructure Planning
The District does not currently have an approved infrastructure master plan. However, as a
member of the Merced Subbasin GSA/JPA, the District is participating in the development of a
15 Ibid.
16 Engineer’s Report Proposition 218 Procedures for Benefit Assessments, LeGrand-Athlone Water
District, October 2017.
17 David Orth, Data Request Follow-Up, January 31, 2018.
18 Ibid.
Economic & Planning Systems, Inc. 10 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
Groundwater Sustainability Plan (GSP) for the subbasin. The Subbasin wide Plan will evaluate
the ground and surface water supplies for the entire Subbasin, including those of MID and the
LGAWD’s infrastructure needs in connection with its goals to increase the amount of surface
water delivered from MID. It should be mentioned that the LGAWD, after the addition of 5,800
acres through a future annexation, only covers 29,500 acres of the 513,000 acre Merced
Groundwater Subbasin. The GSP is to be completed by January 2020.19,20
Other Potential Actions to Meet Demand
Infrastructure Expansion
Expanding District infrastructure depends on the District obtaining a more reliable (rather than
year-to-year intermittent) water supply from MID during wet years. The District is working with
MID to develop a long-term agreement for water purchases. Until that agreement is in place or
another source of water is identified, a major infrastructure analysis is premature.21
Proposed Annexation
The annexation of additional land in the vicinity of the District means more landowners will be
able to contribute to the implementation of the Groundwater Sustainability Plan (GSP).22
Additional District membership, assessment revenue, and surface water purchases will create a
larger financial base for the District to construct or expand the District’s existing system. The
District potentially could buy more water from MID if the capacity of its system were sufficient
and MID makes more surface water available to this area. As part of the numerous groundwater
planning efforts underway in the Merced Groundwater Subbasin, other districts are also seeking
increased surface water supplies from MID. In addition, the District believes the annexed lands
will provide the District with additional potential sources of surface water (such as the Chowchilla
River and the Friant Unit of the Central Valley Project23) and provide a source of surface water to
supplement MID sources.24
19 The GSP will be prepared by the firm Woodard & Curran.
20 David Orth, Data Request Follow-Up, January 31, 2018.
21 David Orth, Data Request Follow-Up, January 31, 2018.
22 The Sustainable Groundwater Management Act (SGMA) is a three-bill package that passed the
California state legislature and was signed into California state law by Governor Jerry Brown in
September 2014. Its purpose is to ensure better local and regional management of groundwater use
and it seeks to have a sustainable groundwater management in California by 2042.
23 The Friant Unit of the Central Valley Project delivers water to over one million acres of irrigable
farm land on the east side of the southern San Joaquin Valley from approximately Chowchilla on the
north to the Tehachapi Mountains on the south.
24 David Orth, Data Request Follow-Up, January 31, 2018.
Economic & Planning Systems, Inc. 11 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
4. FINANCIAL REVIEW
Fiscal Conditions
In recent years, the District has experienced financial shortfalls and revenues are not currently
sufficient to fund its current and planned activities. In Fiscal Year 2016/17, the District Budget
indicated an income of $26,900, with most revenue attributed to water sales and property tax
revenue. In the same year, the District expended $52,900 with nearly two-thirds of total
spending attributable to GSA Participation.25 Although the District covered the shortfall using
cash reserves, future participation in the Merced Subbasin GSA/JPA requires more revenue
and/or reserves than the District currently has available.26 The District shares a seat on the six-
seat JPA board with the neighboring Plainsburg Irrigation District so their respective costs have
been reduced.
The District adopted its FY 2017/18 budget on September 21, 2017. The budget indicates total
income of $414,300 and total expenditures of $261,500 for a net income of $152,800. In
addition, the District will be reimbursed $200,000 for an improvement related to increasing the
capacity of a long-crested weir.27 The improvement is funded through a short-term bank loan
with repayment from funds recovered from a water surcharge imposed on landowners and
customers receiving water from the weir.
The District commissions a biennial audit which is approved by the Merced County Board of
Supervisors. By using excess cash reserves, the District has not incurred any short-term debt.
Historically, the District has not maintained adequate annual reserves, however the passing of
the LeGrand-Athlone Water District Ballot (see below) will enable the District to establish and
maintain adequate reserves.28
Water Rates and Charges
In 2017, surface water users in the District were charged $3 per acre foot for surface water
purchased from deliveries through the Fancher lateral into the District. The farmers who
purchased MID water also had to pay MID $82.00 per acre foot. Over the past eight years, the
charge has ranged between $0 and $19.00 per acre foot, although no water was available during
three years of the last drought. Direct deliveries of surplus water from non-District operated
MID conveyances are not metered or billed by the District.29 Table 2 below shows the historical
25 LeGrand Athlone Water District, Income & Expenses Fiscal Year 2017/18
26 Ibid.
27 Long crested weirs are used in open-channel irrigation distribution systems to minimize fluctuations
in the canal water surface above canal turnouts.
28 David Orth, Data Request Follow-Up, January 31, 2018.
29 Water rates will be updated as the LGAWD Board is anticipated to increase these rates on April 19th
2018.
Economic & Planning Systems, Inc. 12 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
surface water rates by MID, the LGAWD surface water delivery charges, and acre feet of surface
water delivered per year since 2009.30
Table 2 Historic Rates, Charges, and Acre Feet/Year Delivered
Ac.Ft. District
Year Rate Delivered Charge
2009 $60.00 2,317 n.a.
2010 $35.00 4,686 $19.00
2011 $42.50 7,655 $15.00
2012 $135.00 1,995 $9.00
2013 n.a. n.a. n.a.
2014 n.a. n.a. n.a.
2015 n.a. n.a. n.a.
2016 $191.00 1,537 $5.00
2017 $82.00 6,295 $3.00
Source: LGAWD
LeGrand-Athlone Water District Ballot31
Because landowners in the District rely on groundwater, and because the implications of SGMA
could be significant to the landowners, the District Board determined the District should become
actively engaged in the implementation of SGMA and join the Merced Subbasin GSA/JPA. The
District shares a seat, on a rotating basis, with the neighboring Plainsburg Irrigation District.
Implementing SGMA requires increased activity by the District as well as increased associated
costs, although the District has reduced their JPA membership share by splitting their seat with
the Plainsburg Irrigation District. The District has historically funded its activities with periodic
water sales revenue and property taxes paid by property owners in the District. However, as
mentioned in Chapter 3, the District does not have a dependable water supply, resulting in
limited funding. To raise the funds necessary to engage in SGMA and the GSA, and to develop
and implement projects and programs to help stabilize and improve groundwater district
conditions within the District, the District proposed to raise maximum annual assessments up to
$10 per acre. Under Proposition 218, a landowner ballot measure passed in January 2018.32 The
assessment provides an annual maximum of $236,500 in new funding for the District.
30 Ibid.
31 LeGrand-Athlone Water District Assessment Ballot, MK Election Services LLC, January 18, 2018.
32 The intent of Proposition 218 is to ensure that all taxes and most charges on property owners are
subject to voter approval. In addition, Proposition 218 seeks to curb perceived abuses in the use of
Economic & Planning Systems, Inc. 13 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
assessments and property-related fees, specifically the use of these revenue-raising tools to pay for
general governmental services rather than property-related services.
Economic & Planning Systems, Inc. 14 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
5. DETERMINATIONS
1. Growth and population projections for the affected area
The LeGrand-Athlone Water District anticipates expanding the District’s boundaries in connection
with a pending annexation application of approximately 5,800 acres. The District believes that
groundwater resources are inadequate to meet future groundwater demand from existing
landowners and for the proposed annexation area. There are plans to supplement the
groundwater supply by investigating the purchase of additional surface water from MID in
abundant water years and exploring additional sources of surface water from other water
districts.
2. The location and characteristics of any disadvantaged unincorporated
communities within or contiguous to the sphere of influence
The District’s 23,700 acre boundary contains rural agricultural area in eastern Merced County,
and does not include the community of Le Grand, recognized as a “Legacy” disadvantaged
unincorporated community. Therefore, there are no identified disadvantaged unincorporated
communities in the District’s existing or proposed sphere of influence.
3. Present and planned capacity of public facilities, adequacy of public services,
and infrastructure needs or deficiencies including needs or deficiencies related to
sewers, municipal and industrial water, and structural fire protection in any
disadvantaged, unincorporated communities within or contiguous to the sphere of
influence.
Currently, the LGAWD relies on available surface water supply from the MID, which fluctuates
year-to-year. This water supply is routed through a canal to canal pipeline. However, not all
landowners in the District currently have access to the District’s facilities and thus do not have
access to a supply of surface water. As a result, the existing canal to canal pipeline requires the
District to improve the connection to allow for the importation of greater amounts of surface
water from MID than has historically occurred.
In addition, the California Department of Water Resources designated the Merced Groundwater
Basin as “critically overdrafted.” The District believes it would benefit from more imported
surface water to address overdraft conditions. As of 2018, the specific amount of current and
projected overdraft is being studied by the Merced Subbasin Groundwater Sustainability Agency
(GSA) Joint Powers Authority as part of the Groundwater Sustainability Plan (GSP). The overdraft
based on these estimates for the Subbasin is approximately 22,000 to 32,000 acre feet per year.
After completion of the GSP, the District will have a better understanding of what facilities and
infrastructure are needed in order to serve the District and its growth.
The focus of this disadvantaged unincorporated communities determination is for those cities and
districts providing sewers, municipal and industrial water, or structural fire protection services,
none of which are provided by the LeGrand-Athlone Water District.
Economic & Planning Systems, Inc. 15 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
4. Financial ability of agencies to provide services.
In recent years, the District has experienced financial shortfalls and revenues are not currently
sufficient for existing and planned services. This shortfall occurs because the District relies on
two limited sources of income, property tax and water sales. Because the District’s water supply
is inconsistent and based on MID’s supply, its financial income is also variable. The adoption of
the SGMA and the District’s participation in the Merced Subbasin GSA/JPA will amplify the need
for more income. The recent approval of the Proposition 218 ballot measure allows the District to
raise annual assessments up to a maximum $10 per acre, if needed. The proposed assessment
totals an annual maximum of $236,500 in new funding for the District which will alleviate
financial stresses associated with the SGMA and the GSA.
5. Status of, and opportunities for, shared facilities
MID and the District have a weir in place via the Fancher canal to canal/pipeline connection
discussed above. The weir is a long-crested weir with the capability for increased surface water
delivery. If the capacity was increased, then the District would be able to buy, and MID would
be able to supply more surface water to the District for in-lieu recharge to the Merced Subbasin
resulting in greater groundwater supply reliability.33 The District is working with MID on a
contract for surface water for 2018 as well as a longer-term agreement. With a longer-term
agreement in place, the District would have a more reliable surface water supply and could
explore expanding facilities to increase the amount of surface water deliveries when excess
surface water is available from MID.
6. Accountability for community service needs, including governmental structure
and operational efficiencies
As a result of the efforts to participate in the Merced Groundwater Subbasin GSA/JPA, the District
has taken positive steps to strengthen the budget and develop a long-term plan to improve
services to District customers. The District holds monthly Board meetings and works with
District Counsel to ensure complies with the Brown Act, such as in posting agendas.
Currently, the District does not have an existing website, but stated that it may consider creating
a website in the future. The District participates in the Merced Groundwater Subbasin GSA/JPA
which maintains a website at www.countyofmerced.com/mercedsubbasinGSA to which
landowners and interested parties are directed. If the District continues to use the Merced
Subbasin GSA/JPA website, the website should be updated with a Staff contact from the District.
Additional transparency measures should include public access via the website to documents
such as budgets, Board Meeting dates, agendas, and minutes.
33 California Water Code Section 78670, “ ‘In-lieu recharge’ means accomplishing increased storage of
groundwater by providing interruptible surface water to a user who relies on groundwater as a primary
supply, to accomplish groundwater storage through the direct use of that surface water in lieu of
pumping groundwater.”
Economic & Planning Systems, Inc. 16 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx
LeGrand-Athlone Water District Municipal Service Review
Draft Report September 2018
7. Any other matter related to effective service delivery, as required by
commission policy
The future expansion of the Le Grand-Athlone Water District sphere of influence and district
boundary will require amendment to the spheres of influence of both the Merced Irrigation
District and the Chowchilla Water District. The LAFCO of Merced County anticipates processing a
sphere of influence amendment and related annexation of approximately 5,800 acres in the near
future to improve District participation in SGMA related activities, increase surface water
deliveries, and enhance District funding, which includes approximately 5,000 acres to be
removed from the Chowchilla Water District’s sphere of influence if the Commission of Madera
LAFCO grants authority for processing to the LAFCO of Merced County. Alternatively, Madera
LAFCO would process the sphere amendment for the Chowchilla Water District.
Economic & Planning Systems, Inc. 17 C:\Users\pdjm\Desktop\LeGrand-Athlone Water District Final Adopted MSR.docx