LAFCO
Planada Community Services District MSR
Read the report at Local Agency Formation Commissions ↗
Final Report
Planada Community Services
District Municipal Service Review
Prepared for:
Merced County Local Agency Formation Commission
Prepared by:
Economic & Planning Systems, Inc.
April 2015
As Approved by LAFCO April 15, 2015
EPS #141037
Table of Contents
1. INTRODUCTION ...................................................................................................... 1
Background and Purpose .......................................................................................... 4
Approach and Methodology ...................................................................................... 4
Governance and Operations ...................................................................................... 5
Projected Growth and Development ........................................................................... 5
Infrastructure, Facilities, and Services ........................................................................ 7
List of Tables
Table 1 Planada Historical Population ............................................................................ 6
List of Figures
Figure 1 Existing Planada Community Services District Boundaries...................................... 2
Figure 2 Existing and Proposed Sphere of Influence .......................................................... 3
Figure 3 WWTP Improvement Project Boundaries ........................................................... 10
1. INTRODUCTION
This Report updates the Municipal Service Review (MSR) prepared for the LAFCO of Merced
County in 2007.1 This MSR addresses the Planada Community Services District (District) and
presents revised findings and conclusions along with updated research. The District is located
along California State Route 140 approximately four miles east of the City of Merced. The District
provides sewer and water services for approximately 5,500 people and covers a service area of
approximately 945 acres, which includes the unincorporated community of Planada and a few
outlying areas.
Planada Community Services District Boundaries are shown in Figure 1. The District has
proposed expanding its sphere of influence (SOI) boundary in conjunction with its Wastewater
Improvement Project, as shown in Figure 2. The SOI expansion area includes the land that is
being acquired for the treatment plant improvements and reclamation areas which involves
approximately 137 acres, along with a small (0.23 acre) District well site located north of the
community on Plainsburg Road.
1 Final Report, County of Merced Water and Sewer Service Providers Municipal Service Review,
Prepared for Merced County Local Agency Formation Commission by Economic & Planning Systems,
Inc., approved by LAFCO May 24, 2007.
Economic & Planning Systems, Inc. 1 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
Figure 1 Existing Planada Community Services District Boundaries
Economic & Planning Systems, Inc. 2 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
Figure 2 Existing and Proposed Sphere of Influence
Source: Lee Fremming, Quad Knopf, Inc.
Economic & Planning Systems, Inc. 3 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
Background and Purpose
In 1997, the State Legislature convened a special commission to study and make
recommendations about how to accommodate California’s rapidly accelerating growth. The
Commission on Local Governance for the 21st Century focused on empowering the already
existing County Local Agency Formation Commissions (LAFCOs) governed by the Cortese-Knox
Local Government Reorganization Act of 1985. The Commission’s final report, Growth within
Bounds, recommended various changes to local land use laws and LAFCO statutes to allow
LAFCOs more influence in shaping California’s growth. Assembly Speaker Robert Hertzberg
encompassed the recommendations of the Commission in Assembly Bill 2838, which passed into
the Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000. The law endows
LAFCO with both more responsibilities and more influence to direct growth in California.
One of LAFCO’s responsibilities requires regional studies of municipal services (or MSRs) every
five years, in conjunction with reviews of city and district spheres of influence. Government
Code Section 56425 directs LAFCOs to review and update agencies’ SOIs, as necessary, every
five years. Section 56430 requires MSRs to be conducted before or in conjunction with the
sphere updates. The Local Government Reorganization Act requires that this MSR address the
following factors:
1. Growth and population projections for the affected area
2. The location and characteristics of any disadvantaged unincorporated communities within or
contiguous to the sphere of influence
3. Present and planned capacity of public facilities and adequacy of public services, including
infrastructure needs or deficiencies
4. Financial ability of agencies to provide services
5. Status of, and opportunities for, shared facilities
6. Accountability for community service needs, including governmental structure and
operational efficiencies
7. Any other matter related to effective service delivery, as required by commission policy
Approach and Methodology
Economic & Planning Systems, Inc. (EPS) has been retained by LAFCO to update the MSR for the
Planada Community Services District in Merced County. EPS reviewed the various plan
documents provided by LAFCO and District staff, the District's current budget, the prior MSR
document, and other readily available information to prepare this Report. The Report presents a
summary of the District’s services, issues, and trends and reviews the seven State-mandated
issue areas based on the evidence presented.
Economic & Planning Systems, Inc. 4 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
Governance and Operations
The Planada Community Services District was originally formed by the Merced County Board of
Supervisors in 1967 and acquired the Planada Sanitary District in 1981.2 The District provides
water and sewage services to the unincorporated community of Planada and a few outlying
areas, covering a total area of 945 acres serving 5,500 people. The District has a seven-person
staff and a five-member Board of Directors, which meets the third Tuesday of each month at 103
Live Oak Street in Planada.3
Total operating expenses for FY 2014-2015 are $1,127,200. This includes $621,600 for water
and $659,800 for sewer. Additional expenses include $2,610 in vehicle payments and $130,823
in reserve deposits, $80,822 in water reserves and $50,001 in sewer reserves.4
As of January 2015, monthly water rates are $33 for ¾ inch to 1 inch service, $44 for 1.5 inch
services, and $70 for 2 inch service; monthly sewer rates are $52. According to the Planada
Wastewater Treatment Plant Improvement Project Environmental Impact Report (Project EIR),
Planada’s 2011 sewer rates of $46 per month were unaffordable as defined by the US
Environmental Protection Agency’s affordability guideline, which states that affordable sewage
rates are two percent of the median household income.
Projected Growth and Development
As of 2013, the community of Planada had a population of 4,678, a 6 percent population increase
from the 2000 population of 4,396. The community’s growth slowed considerably from a 2.2
percent annual growth rate between 1990 and 2000 to a rate of 0.5 percent between 2000 and
2010 and 0.7 percent between 2010 and 2013, as shown in Table 1.
2 Planada Wastewater Treatment Plant Improvement Project Draft Environmental Impact Report,
prepared for the Planada Community Services District by Valley Planning Consultants, Inc., September
9, 2011
3 Personal communication from Planada Community Services District, January 16, 2015
4 Planada Community Services District Annual Budget FY 2014-2015.
Economic & Planning Systems, Inc. 5 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
Table 1 Planada Historical Population
Year Population Annual Growth Rate1
1990 3,531 --
2000 4,369 2.2%
2010 4,584 0.5%
20132 4,678 0.7%
(1) Reflects growth rate from previous benchmark year. 2000
growth rate reflects rate from 1990 to 2000, 2010 reflects rate
from 2000 to 2010, and 2013 reflects rate from 2010 to 2013
(2) The 2013 population is for the census designated place; this
population estimate is less than the total service population,
including areas outside the Planada urban boundaries, as
reported by the County.
Sources: Census; 2009-2013 ACS 5-year survey; Economic &
Planning Systems
The Planada Community Plan, adopted by the Merced County Board of Supervisors in December
2003, projects plan area population in five-year increments from 2000 to 2020 based on five
different annual growth rates ranging from 0.90 percent to 5.16 percent. Based on these
projections, the Community estimated that it would reach its buildout population of 8,500 by as
early as 2015 depending on the economy and housing market.
The 2030 Merced County General Plan, adopted by the Merced County Board of Supervisors in
December 2013, also estimates Planada’s future population under six growth policy alternatives.
The Plan estimates a population of 6,700 to 9,139 by 2030, a growth rate ranging from
1.5 percent to 2.8 percent annually. Under these growth scenarios, Planada would reach its
build-out population as early as 2025 to 2030.
However, recent growth has been much slower, averaging 0.7 percent from 2010 to 2013.
Applying this growth rate to the ACS 2013 population estimate of 4,678 results in a 2030
population of 5,249, which is less than build-out capacity.
According to the 2003 Community Plan, 62 percent of the Plan Area is zoned for residential uses,
with 45 percent of total Plan Area zoned for low-density residential uses. Approximately 17
percent of land is commercial, 9 percent schools, and 8 percent parks. The remaining land is
industrial and open space.
Economic & Planning Systems, Inc. 6 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
Infrastructure, Facilities, and Services
Water
The District serves approximately 1,300 water connections and its production capacity is
approximately 4.32 million gallons per day (mgd). Average usage is around 0.97 mgd and 354
million gallons per year.5 This average usage is lower than the 2007 average usage of 1.1 mgd
and 400 million gallons per year as recorded in the previous MSR despite a population increase.
Current peak hour demand accounts for approximately 92 percent of well capacity.6
Domestic water is supplied to District customers by six groundwater wells. Water is chlorinated,
pumped into the water transmission system, and conveyed to residents through a pressurized
water system.7 District facilities include six wells, six pressure tanks, and approximately 12
miles of water main.8 Existing facilities are adequate to meet current demand. However, any
future growth will require construction of at least one additional well in order to meet peak hour
demand.9
Wastewater
The District provides service to 1,181 physical sewer connections. Some of these connections
serve multiple dwelling units, so the total units served is estimated to be approximately
consistent with the 1,383 connections as recorded in the 2011 Project EIR and 1,411 connections
as recorded in the previous MSR. The District’s wastewater treatment capacity totals 0.53 mgd;
existing average daily wastewater flow varies from approximately .45 to 0.50 mgd. 10
The District operates one wastewater treatment plant (WWTP) located approximately one-half
mile southwest of the Community. The WWTP currently discharges disinfected secondary treated
effluent to Miles Creek. The State of California’s Central Valley Regional Water Quality Control
Board (CVWB) regulates the treatment processes, capacity, and discharge of the WWTP.
Between January 2000 and January 2008 the District was charged with 170 violations of
wastewater discharge requirements.11 The CVWB ordered the District to either bring the quality
5 Personal communication from Planada Community Services District, January 16, 2015
6 Merced County General Plan Housing Element, prepared by Mintier Harnish Planning Consultants,
adopted June 22, 2010
7 Final Report, County of Merced Water and Sewer Service Providers Municipal Service Review,
Prepared for Merced County Local Agency Formation Commission by Economic & Planning Systems,
Inc., approved by LAFCO May 24, 2007.
8 Personal communication from Planada Community Services District, January 16, 2015
9 Personal communication from Lee Fremming, December 19, 2014
10 Personal communication from Planada Community Services District, January 16, 2015
11 Merced County Association of Governments, Request to Fund Wastewater Treatment Facility
Improvements, http://www.mcagov.org/ArchiveCenter/ViewFile/Item/151
Economic & Planning Systems, Inc. 7 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
of wastewater effluent discharged to Miles Creek up to quality requirements, or provide an
alternative method of effluent disposal. Further, the CVWB requires public entities charged with
wastewater disposal to plan for modifications to or replacement of wastewater treatment
facilities when influent reaches 80 percent of WWTP treatment capacity, which Planada currently
exceeds.12
To comply with CVWB requirements, improve wastewater treatment, and provide adequate
wastewater load capacity to meet existing and future needs, the District is undertaking a WWTP
Improvement Project (Project) to change the point of effluent disposal, increase its WWTP
capacity, and improve and upgrade existing facilities. The District filed a “Petition for Change”
with the CVWB to discontinue its effluent discharge to Miles Creek and instead direct effluent
discharge to agricultural reclamation areas.13 The Project will be undertaken in two phases and
include improvement to the existing WWTP and acquisition of land for its reclamation area.
According to the Project EIR, in Phase 1 improvements to the existing WWTP will be constructed
within the boundaries of the existing WWTP site and on an additional 13.6 acres immediately
south and adjacent to the existing WWTP. Proposed facility improvements include new WWTP
headworks, treatment pond expansion and upgrades, and a new effluent pump station and
storage ponds. In addition, 124 acres would be purchased for agricultural reclamation. In Phase
2, the District would acquire 40 additional acres for reclamation, for a total of 164 acres.
According to the District, it has purchased approximately 108 acres for Phase 1 with plans to
purchase approximately 35 additional acres for Phase 2.
The Project will bring the District into compliance with wastewater quality standards and expand
the WWTP treatment capacity from 0.53 to 0.58 in Phase 1 and to 0.75 in Phase 2. Phase 1 will
add capacity to serve an additional 150 sewer connections, which have already been committed
to developers owning land within the District, but for which no project entitlements have been
issued at the time this MSR was prepared. Phase 2 would add capacity for approximately 400
additional equivalent dwelling units. It should be noted that even with both Phase 1 and Phase 2
improvements, the sewer plant capacity will still be less than that required to support the
community's build out as identified and mapped in the Planada Community Plan (2003). This
new capacity is less than one-half of the growth in units that were planned for in the Community
Plan (approximately 1,000 additional units). (Table 2.1, Page 2-8 of the Planada Community
Plan).
The District used a bond obtained from Independent Cities Finance Authority as interim financing
to purchase the required land for the Project, and has since received funding through grants and
loans from the State Regional Water Quality Control Board (SRWQB) and the United States
Department of Agriculture-Rural Development (USDA-RD). The District will use grant and loan
funds from the USDA-RD to pay off the balance of $3,185,315 to Independent Cities Finance
Authority on March 19, 2015. Total Project funding includes an already paid-in District
contribution ($221,436); USDA Rural Development loan ($2,211,000) and grant ($2,597,000);
and State Regional Water Quality Control Board loan ($4,444,825) and grant ($3,620,000)
12 Planada Wastewater Treatment Plant Improvement Project Draft Environmental Impact Report
13 Ibid
Economic & Planning Systems, Inc. 8 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
funding. 14 By diverting discharge from Miles Creek to agricultural reclamation, the District’s
wastewater operating costs will decrease, as monitoring, chlorine, and personnel costs will
decline. 15 The Project is also projected to provide the District with an increase in miscellaneous
revenues from new connection fees, with 150 new committed connections in Phase 1 and 400
new connections in Phase 2. Given these revenues and cost savings, the District will have
sufficient funds available for debt service, with projected debt service coverage of 1.54, 1.72,
and 1.83 in 2014/2015, 2015/2016, and 2016/2017, respectively.16 The District has received a
signed notice to proceed on Phase 1 from the State Water Board. Construction is planned to start
in the spring of 2015 and last approximately six months. Phase 2 is a long range plan that will be
undertaken in accordance with the Community’s growth.17
Project boundaries and acquisition land as specified in the Project EIR are shown in Figure 3.
14 Personal communication from Eddie Ocampo, February 12, 2015.
15 Personal communication from Planada Community Services District, January 22, 2015
16 State Water Resources Control Board Division of Financial Assistance, Planada Community Services
District – Sewer Enterprise Fund Revenues and Expenses, provided by Eddie Ocampo February 10,
2015.
17 Personal communication from Planada Community Services District, January 22, 2015
Economic & Planning Systems, Inc. 9 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
Figure 3 WWTP Improvement Project Boundaries
Source: Planada Wastewater Treatment Plant Improvement Project Draft Environmental Impact
Report, September 2011
Determinations
1. Growth and population projections for the affected area
The community’s growth slowed considerably from a 2.2 percent annual growth rate between
1990 and 2000 to a rate of 0.5 percent between 2000 and 2010 and 0.7 percent between
2010 and 2013. According to the 2030 Merced County General Plan, Planada would reach its
buildout population as early as 2025 to 2030. However, applying the most up-to-date growth
rate of 0.7 percent to the community’s 2013 ACS population estimate, Planada would reach a
population of 5,249 in 2030, which is less than the Community Plan build-out capacity.
Economic & Planning Systems, Inc. 10 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
In addition, it is assumed that the District will continue to serve residents outside of the
urban boundaries of Planada.
Due to the District’s current capacity limitations, projected growth will require expansion of
WWTP capacity beyond that identified in the District’s Phase 1 and Phase 2 wastewater plant
expansion plans. The District also desires to include the wastewater treatment plant site and
related effluent disposal property into the District over time, which would require inclusion of
137.65 acres of additional land to the District’s sphere of influence.
2. The location and characteristics of any disadvantaged unincorporated
communities within or contiguous to the sphere of influence
A report prepared by PolicyLink in 2013 identified Planada as a disadvantaged unincorporated
community.18 The legislation regarding disadvantaged unincorporated communities was
enacted through SB 244 in 2011, which amended various sections of the California
Government Code. Of specific relevance to Planada, Government Code section 65302.10(a)
defines a geographically isolated community that is inhabited and has existed for at least 50
years as a "Legacy Community." Planada qualifies as a Legacy Community as it is isolated –
not located within the sphere of influence of an incorporated city. As such, the service
capacity and issues identified in this Municipal Service Review address the content
requirements under SB 244 as it applies to Planada.
3. Present and planned capacity of public facilities and adequacy of public
services, including infrastructure needs or deficiencies
The present capacity of the WWTP is 0.53 mgd. Phase 1 of the WWTP Improvement Project
will increase capacity to 0.58 mgd and Phase 2 will increase capacity to 0.75 mgd. The main
sewage lift station is adequate for 0.58 mgd, but will probably need to be upgraded for any
additional demand beyond 0.58 mgd. The existing water supply and distribution system is
adequate at 4.32 mgd; however, any additional growth will require construction of at least
one additional well.
4. Financial ability of agencies to provide services
The District presently has the financial ability to provide water and sewer services to its
existing customers. Sewer rates are classified as unaffordable by the U.S. Environmental
Protection Agency standard of 2 percent of median household income. The District will have
sufficient funds to pay off debts accrued from the Project.
5. Status of, and opportunities for, shared facilities
No opportunities for shared facilities have been identified as Planada is an isolated
unincorporated urban community. Many years ago the City of Merced investigated including
capacity for Planada in their sewer plant expansion project, but the City’s sewer plant is
located over 10 miles away from Planada’s plant site.
18 California Unincorporated: Mapping Disadvantaged Communities in the San Joaquin Valley,
PolicyLink, 2013
Economic & Planning Systems, Inc. 11 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx
Planada Community Services District Municipal Service Review
Final Report 04/15/15
6. Accountability for community service needs, including governmental structure
and operational efficiencies
PCSD has a five-member Board of Directors that holds public meetings on the third Tuesday
of each month. While the District no longer maintains a website, the District can be reached
by phone and email Monday through Friday during normal business hours and responds
quickly to questions and inquiries. However, the community is low income, and delays and
difficulties in planning for and funding the necessary sewer plant replacement project have
resulted in over 170 violations of the State Regional Water Quality Control Board discharge
requirements. To address this problem, the land required for the new treatment plant was
recently purchased by the district, and grant and district funding has been obtained for
construction of the Phase 1 improvements.
7. Any other matter related to effective service delivery, as required by
commission policy
No additional matters related to effective service delivery have been identified.
Economic & Planning Systems, Inc. 12 C:\Documents and Settings\prgw.CO\Desktop\WebStuffs\PCSD_Final_MSR.docx