LAFCO
SOI Napa Berryessa Resort Improvement District 2013
Read the report at Local Agency Formation Commissions ↗
LOCAL AGENCY FORMATION COMMISSION OF NAPA COUNTY
Political Subdivision of the State of California
We Manage Government Boundaries, Evaluate Municipal Services, and Protect Agriculture
SPHERE OF INFLUENCE REVIEW AND UPDATE:
Napa Berryessa Resort Improvement District
Final Report
April 2013
Pending Commission Approval
LAFCO of Napa County
Commissioners Staff / Administrative Office
Brad Wagenknecht, Chair, County Member Keene Simonds, Executive Officer
Brian J. Kelly, Vice Chair, Public Member Jacqueline M. Gong, Counsel
Joan Bennett, Commissioner, City Member Brendon Freeman, Staff Analyst
Lewis Chilton, Commissioner, City Member Kathy Mabry, Commission Secretary
Bill Dodd, Commissioner, County Member
Juliana Inman, Alternate Commissioner, City Member 1030 Seminary Street, Suite B
Mark Luce, Alternate Commissioner, County Member Napa, California 94559
Gregory Rodeno, Alternate Commissioner, Public Member www.napa.lafco.ca.gov
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
This page has been left intentionally blank for photocopying
1
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
TABLE OF CONTENTS
Part Title Page
I. INTRODUCTION
1.0 Local Agency Formation Commissions.......................................... 4
1.1 Authority and Objectives........................................................... 4
1.2 Regulatory Responsibilities....................................................... 4
1.3 Planning Responsibilities.......................................................... 5
1.4 Composition.............................................................................. 6
1.5 Funding...................................................................................... 6
2.0 LAFCO of Napa County.................................................................. 7
II. EXECUTIVE SUMMARY
1.0 Overview.............................................................................................. 8
2.0 Conclusions and Recommendations………………………………. 8
2.1 Role of NBRID………………………………………………… 8
2.2 Policy Focus.................………………………………………... 9
2.3 Conclusions……………………………………………………. 10
2.4 Recommendation and Determinative Statements........................ 11
III. AGENCY PROFILE
1.0 Background....................................................................................... 14
1.1 Formation Proceedings……………………………………….. 14
1.2 Development Activities………………………………………. 14
1.3 Financial Issues………………………………………………. 15
1.4 Reorganization Approval…………………………………….. 16
2.0 Current Activities............................................................................. 16
3.0 Sphere of Influence........................................................................... 17
3.1 Establishment............................................................................ 17
3.2 Amendments and Updates......................................................... 17
4.0 Planning Factors............................................................................... 18
4.1 Land Uses Within Boundary..................................................... 18
4.2 Land Uses Outside Boundary.................................................... 19
IV. DISCUSSION
1.0 Objectives.......................................................................................... 19
2.0 Timeframe......................................................................................... 20
V. STUDY CATEGORIES
1.0 Criteria.............................................................................................. 20
2.0 Selection............................................................................................. 20
VI. ANALYSIS
1.0 Evaluation Factors........................................................................... 22
2.0 Study Category A............................................................................. 22
2.1 Subarea A-1............................................................................... 22
2.2 Subarea A-2............................................................................... 25
VII. ATTACHMENTS
A MSR Executive Summary
2
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
This page has been left intentionally blank for photocopying
3
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
I. INTRODUCTION
1.0 Local Agency Formation Commissions
1.1 Authority and Objectives
Local Agency Formation Commissions (LAFCOs) were
established in 1963 as political subdivisions of the State of
California and are responsible for providing regional growth
management services under the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000 (“CKH”).1 LAFCOs
are located in all 58 counties in California and are delegated
regulatory and planning powers to coordinate and encourage
the logical formation and development of local governmental
agencies and their municipal services. Towards this end,
LAFCOs are commonly referred to as the Legislature’s
“watchdog” for local governance issues. Underlying LAFCOs
regulatory and planning powers is fulfilling specific objectives
outlined by the California Legislature under Government Code
(G.C.) Section 56301, which states:
“Among the purposes of the commission are discouraging urban sprawl, preserving open space and prime
agricultural lands, efficiently providing governmental services, and encouraging the orderly formation and
development of local agencies based upon local conditions and circumstances. One of the objects of the
commission is to make studies and to obtain and furnish information which will contribute to the logical and
reasonable development of local agencies in each county and to shape the development of local agencies so as to
advantageously provide for the present and future needs of each county and its communities.”
1.2 Regulatory Responsibilities
LAFCOs’ principal regulatory responsibility includes approving or disapproving all
jurisdictional changes involving the establishment, expansion, and reorganization of cities
and special districts within their jurisdictions.2 LAFCOs are also provided broad discretion
to condition jurisdictional changes as long as they do not directly regulate land use, property
development, or subdivision requirements. LAFCOs generally exercise their regulatory
authority in response to applications submitted by local agencies, landowners, or registered
voters. Recent amendments to CKH, however, now empower and encourage LAFCOs to
initiate on their own jurisdictional changes to form, merge, and dissolve special districts
consistent with current and future community needs. The following table provides a
complete list of LAFCOs’ regulatory authority as of January 1, 2012.
LAFCOs’ Regulatory Authority
• City Incorporations and Disincorporations • City and District Annexations
• District Formations and Dissolutions • City and District Detachments
• City and District Consolidations • Merge/Establish Subsidiary Districts
• City and District Outside Service Extensions • District Service Activations or Divestitures
1 Reference California Government Code Section 56000 et seq.
2 CKH defines “city” to mean any incorporated chartered or general law city. This includes any city the name of which includes the word
“town”. CKH defines “special district” to mean any agency of the State formed pursuant to general law or special act for the local
performance of governmental or proprietary functions within limited boundaries. All special districts in California are subject to
LAFCO with the following exceptions: school districts; community college districts; assessment districts; improvement districts;
community facilities districts; and air pollution control districts.
4
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
1.3 Planning Responsibilities
LAFCOs inform their regulatory actions through two central and interrelated planning
responsibilities: (a) making sphere of influence (‘sphere”) determinations and (b) preparing
municipal service reviews. Sphere determinations have been a central planning function of
LAFCOs since 1971 and effectively serve as the Legislature’s version of “urban growth
boundaries” with regard to delineating the appropriate interface between urban and non
urban uses. Municipal service reviews, in contrast, are a relatively new planning
responsibility enacted in 2001 as part of CKH and are intended to inform – among other
activities – sphere determinations. The Legislature mandates, notably, all sphere changes be
accompanied by preceding municipal service reviews to help ensure LAFCOs are effectively
aligning governmental services with current and anticipated community needs. An expanded
summary of the function and role of these two planning responsibilities follows.
Sphere Determinations
LAFCOs establish, amend, and update spheres for all cities and special districts to
designate the territory it independently believes represents the appropriate and probable
future service area and jurisdictional boundary of the affected agency. Importantly, all
jurisdictional changes, such as annexations and detachments, must be consistent with the
spheres of the affected local agencies with limited exceptions.3 Further, an increasingly
important role involving sphere determinations relates to their use by regional councils
of governments as planning areas in allocating housing need assignments for counties
and cities, which must be addressed by the agencies in their housing elements. LAFCO
must review and update each local agency’s sphere every five years as necessary. In
making a sphere determination, LAFCO is required to prepare written statements
addressing five specific planning factors listed under G.C. Section 56425. These
mandatory factors range from evaluating current and future land uses to the existence of
pertinent communities of interest. The intent in preparing the written statements is to
focus LAFCO in addressing the core principles underlying the sensible development of
each local agency consistent with the anticipated needs of the affected community. The
five planning factors are summarized in the following table.
Sphere Determinations: Mandatory Written Statements
1. Present and planned land uses in the area, including agricultural and open space.
2. Present and probable need for public facilities and services in the area.
3. Present capacity of public facilities and adequacy of public services the agency provides or
is authorized to provide.
4. Existence of any social or economic communities of interest in the area if the commission
determines they are relevant to the agency.
5. If the city or district provides water, sewer, or fire, the present and probable need for those
services of any disadvantaged unincorporated communities within the existing sphere.
Municipal Service Reviews
Municipal service reviews are comprehensive studies of the availability and sufficiency of
governmental services provided within a defined geographic area. LAFCOs generally
prepare municipal service reviews to inform subsequent sphere determinations.
LAFCOs also prepare municipal service reviews irrespective of making any specific
3 Exceptions in which jurisdictional boundary changes do not require consistency with the affected agencies’ spheres include annexations
of State correctional facilities or annexations to cities involving city owned lands used for municipal purposes.
5
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
sphere determinations in order to obtain and furnish information to contribute to the
overall orderly development of local communities. Municipal service reviews vary in
scope and can focus on a particular agency or governmental service. LAFCOs may use
the information generated from municipal service reviews to initiate other actions under
their authority, such as forming, consolidating, or dissolving one or more local agencies.
Municipal service reviews culminate with LAFCOs preparing written statements
addressing seven specific service factors listed under G.C. Section 56430. This includes,
most notably, infrastructure needs or deficiencies, growth and population trends, and
financial standing. The seven service factors are summarized in the following table.
Municipal Service Reviews: Mandatory Written Statements
1. Growth and population projections for the affected area.
2. Location and characteristics of any disadvantaged unincorporated communities within or
contiguous to affected spheres of influence.4
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies.
4. Financial ability of agencies to provide services.
5. Status and opportunities for shared facilities.
6. Accountability for community service needs, including structure and operational efficiencies.
7. Any matter related to effective or efficient service delivery as required by LAFCO policy.
1.4 Composition
LAFCOs are generally governed by an eight-member board comprising three county
supervisors, three city councilmembers, and two representatives of the general public.5
Members are divided between “regulars” and “alternates” and must exercise their
independent judgment on behalf of the interests of residents, landowners, and the public as a
whole. LAFCO members are subject to standard disclosure requirements for California
public officials and must file annual statements of economic interests. LAFCOs have sole
authority in administering its legislative responsibilities and its decisions are not subject to an
outside appeal process.
All LAFCOs are independent of local government with the majority employing their own
staff; an increasingly smaller portion of LAFCOs choose to contract with their local county
government for staff support services. All LAFCOs, nevertheless, must appoint their own
Executive Officers to manage agency activities and provide written recommendations on all
regulatory and planning actions before the members.
1.5 Funding
CKH prescribes local agencies fund LAFCOs’ annual operating costs. Counties are
generally responsible for one-half of LAFCO’s annual operating costs with the remainder
proportionally allocated among cities based on a calculation of tax revenues and population.6
LAFCOs are also authorized to collect fees to offset local agency contributions.
4 This determination was added to the municipal service review process by Senate Bill 244 effective January 1, 2012. The definition of
“disadvantaged unincorporated community” is defined under G.C. Section 56330.5 to mean inhabited territory that constitutes all or a
portion of an area with an annual median household income that is less than 80 percent of the statewide annual median household
income.
5 Several LAFCOs also have two members from independent special districts within their county.
6 The funding formula for LAFCOs with special district representation provides that all three appointing authorities (county, cities, and
special districts) are responsible for one-third of LAFCOs’ annual operating costs.
6
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
2.0 LAFCO of Napa County
LAFCO of Napa County (“Commission”) was first established in 1963 as a department
within the County of Napa. Consistent with pre CKH provisions, the County was entirely
responsible for funding the Commission’s annual operating costs over the first three
decades. Further, the duties of the Executive Officer were first performed by the County
Administrator and later the County Planning Director.
CKH’s enactment in 2001 changed the Commission’s funding to assign one-half of its
operating costs to the County with the other one-half assigned to the Cities of American
Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville. CKH’s enactment also
facilitated a number of organizational changes highlighted by the Commission entering into a
staff support services agreement with the County; an agreement allowing the Commission,
among other things, to appoint its own Executive Officer. The Commission’s current
member roster is provided below.
Napa LAFCO’s Commission Roster
Appointing Agency Regular Members Alternative Members
County of Napa: Supervisors Bill Dodd Mark Luce
Brad Wagenknecht
City Selection Committee: Mayors Joan Bennett Juliana Inman
Lewis Chilton
Commissioners: City and County Brian J. Kelly Gregory Rodeno
Staffing for the Commission currently consists of 2.5 full-time equivalent employees. This
includes a full-time Executive Officer and Analyst along with a part-time Secretary.7 Legal
services are provided by the County Counsel’s Office. All other staffing related services,
such as accounting, human resources, information technology, are provided by the County
as needed. The Commission’s adopted budget for 2012-2013 totals $0.432 million with an
audited unreserved/undesignated fund balance of $0.119 million as of June 30, 2012.
7 The Commission contracts with the County for staff support services. The Executive Officer and all support personnel are County
employees. The Commission, however, appoints and removes the Executive Officer on its own discretion.
7
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
II. EXECUTIVE SUMMARY
1.0 Overview
This report represents the Commission’s scheduled sphere update for Napa Berryessa Resort
Improvement District (NBRID). The underlying objective of the report is to review
NBRID’s existing sphere relative to current legislative directives, local policies, and member
preferences in justifying whether to (a) change or (b) maintain the designation. This report
supersedes the last sphere update on NBRID adopted in December 2007. The report draws
on information collected and analyzed in the Commission’s recently completed municipal
service review on the Lake Berryessa region, which includes the evaluation of availability,
adequacy, and capacity of services provided by NBRID.
2.0 Conclusions and Recommendations
2.1 Role of NBRID
NBRID continues to serve an important role in supporting existing and planned
development within the Berryessa Highlands community and its estimated 920 residents by
providing public water and sewer services. Importantly, organized water and sewer services
would otherwise be unavailable to the community and its residents given the lack of
alternative providers in the region. NBRID has also assumed a unique and expanded
governance role as the community’s primary conduit with the County’s Board of Supervisors
given their role as the District Board. NBRID’s effectiveness in meeting current and future
community needs, however, has been increasingly challenged given the District’s ongoing
financial distress compounded by the need for significant improvements to the sewer
system; a dynamic highlighted by a negative fund balance, dependency on the County for
emergency loans, and operating under a State-directed moratorium on sewer connections.
These referenced challenges have been further intensified most recently by the stalled
redevelopment plans of the United States Bureau of Reclamation’s (“Bureau”) for the
former Steele Park Resort site.8
With the preceding governance issues in mind, and based on information collected during
the municipal service review, the Commission initiated and conditionally approved the
reorganization of NBRID into a community services district under the expedited
proceedings available under G.C. Section 56853.5 in April 2011. The Commission’s stated
intent in approving the reorganization is two-fold. First, reorganization positions the
anticipated Napa Berryessa Community Services District (NBCSD) to become more
responsive to changes in constituent needs by having the power – subject to subsequent
Commission approval – to provide additional municipal services in support of Berryessa
Highlands’ continued development. Second, reorganization improves public accountability
by facilitating the delegation of responsibilities in planning for the present and future service
needs of the community from the County to local residents. Specifically, the Commission
approved reorganization with the explicit expectation it would directly lead NBCSD to call
and conduct an election to replace the County Board of Supervisors with registered voters as
the governing board. Approval, nonetheless, has been conditioned on NBRID first
executing water and sewer service contracts with the approved concessionaire for the former
8 NBRID’s ability to implement the needed utility improvements is dependent on Bureau’s pending redevelopment of the former Steele
Park Resort site; a critical component to funding any improvements given the potential impact on a voter-approved assessment.
8
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
Steele Park Resort site: a condition requested by NBRID and intended to help ensure the
reorganized District will have sufficient revenue sources going forward.9 The Commission
recently extended the condition deadline from April 2012 to December 2017.10
2.2 Policy Focus
The report and its analysis has been oriented to focus on one central policy question as to
whether it is appropriate to expand NBRID’s current sphere to include the District’s entire
jurisdictional boundary. This central consideration is drawn from the Commission’s
previous action to include only one-fourth of NBRID’s jurisdictional boundary in
establishing the sphere in 1985 for reasons detailed in this report and summarized in the
succeeding paragraphs. The report, accordingly, evaluates the merits of adding this lone
study category consisting of approximately 1,387 acres of remaining jurisdictional land to the
sphere relative to current considerations (i.e., legislative directives, adopted policies, and
member preferences). The report further divides this lone study category into two distinct
subareas labeled “A-1” and “A-2” based on private versus public ownership.
9 The condition addresses a discrepancy between resort improvement district and community services district laws as it relates to the ability
of an affected district to require a landowner to connect to a public water system. A resort improvement district is authorized to require
water and sewer connection of any landowner while a community services district has only the power to require sewer connection.
10 The approved extension of the condition deadline to December 2017 corresponds with the sunset date provided for the expedited
reorganization proceedings under G.C. Section 56853.5.
9
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
2.3 Conclusions
The report concludes there is equal merit for the Commission to either change or maintain
NBRID’s existing sphere designation depending on the collective preference of members
(emphasis added). The principal justification to change and expand NBRID’s sphere to
include both subareas – A-1 and A-2 – applies if it is the preference of the Commission to
assign deference to the lands’ existing social and economic ties with the District. These ties
apply – albeit at different degrees – to both subareas and are borne from their standing
inclusion in NBRID’s jurisdictional boundary.
It is important to note the referenced ties within the two subareas are particularly
pronounced for A-1’s Oakridge Estates – a distinct subdivision within Berryessa Highlands –
given the landowners have already established service connections to NBRID’s water and
sewer systems. Landowners in Oakridge Estates, accordingly and similar to landowners
already within the sphere, pay the same or equivalent user rates and assessments. The
addition of both subareas to the sphere would also delete a decades-old policy statement that
has proven ineffective in encouraging NBRID to initiate detachment proceedings for the
affected lands. Adding the subareas to the sphere may also prove advantageous in engaging
the affected landowners with respect to their current and future needs in anticipation of
completing the pending reorganization.11
In contrast to the preceding considerations, the principal consideration to maintaining
NBRID’s existing sphere is drawn from the two subareas’ limited land use and, to a lesser
degree, service compatibilities with the District. In particular, this includes recognizing the
addition of the subareas to the sphere would be inconsistent with a Commission policy given
it would serve to support the location of urban uses within agricultural/open-space
designated lands as defined under the County General Plan.12 It is also reasonable to assume
adding the subareas does not provide new assurances services would be established by
NBRID within those affected lands not already being served in the next 10 years; a potential
outcome that is explicitly discouraged under Commission policy with respect to designating
spheres.13 Finally, it would be reasonable for the Commission to defer making any changes
to the sphere to the next update to allow the pending reorganization proceedings to
conclude and/or if members believe more information is needed in aligning the sphere with
the needs of the community.
Given the foregoing conclusions, the following four distinct options have been identified for
consideration by the Commission in updating NBRID’s sphere at this time.
• Option One:
Affirm and Expand the Sphere to Include the Entire Jurisdictional Boundary
This option would be appropriate if it is the Commission’s preference to assign
overriding deference to the lands’ existing social and economic ties to NBRID in
choosing to add the subareas to the sphere.
11 The conclusion of the reorganization proceedings appears to have three possible outcomes. The first and ideal outcome would be for
the reorganization proceedings to be complete upon satisfaction of all terms and conditions by the December 2017 deadline. The
second possible outcome would be for the reorganization proceedings to be terminated if the terms and conditions are not satisfied by
the referenced deadline and no follow up action is pursued by the Commission in the near term. The third possible outcome would be
for the reorganization proceedings to be terminated if the terms and conditions are not satisfied by the referenced deadline and new
proceedings are pursued by the Commission in the short term.
12 Statement references Policy Determination III/B/(3).
13 Statement references Policy Determination III/B/(5)/(b).
10
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
• Option Two:
Affirm and Expand the Sphere to Include A-1’s Oakridge Estates
This option would be appropriate if it is the Commission’s preference to assign
overriding deference to the existing provision and need for water and sewer services
within the lands as well as their social and economic ties to NBRID in choosing to
add the approximate 130 acres to the sphere. This option would orient the sphere to
explicitly reflect NBRID’s present service area, and in doing so, eliminate the current
policy inference of the Commission that the affected lands – irrespective of their
connectivity to the water and sewer systems – be detached.
• Option Three:
Affirm Sphere and Pursue Detachment Alternatives
This option would be appropriate if it is the Commission’s preference to emphasize
the affected lands’ limited land use and, to a lesser degree, service planning
compatibilities with NBRID in choosing to continue to exclude the subareas from
the sphere with the pertinent exception of the Oakridge Estates given its referenced
service ties to the District. This option would serve to reaffirm the Commission’s
policy statement the affected lands be detached and memorialized by requesting the
NBRID Board take action to initiate a proposal for Commission consideration to
detach the subareas.
• Option Four:
Affirm Sphere and Table Related Policy Considerations
This option would be appropriate if it is the Commission’s preference to maintain
the status quo on the sphere and table all related policy considerations to the next
update. This option would specifically be appropriate if the Commission prioritizes
allowing the pending reorganization proceedings to be completed without changing
baseline factors and/or if members believe more information is needed in aligning
the sphere with the needs of the community.
2.4 Recommendation and Determinative Statements
It is recommended the Commission affirm and expand NBRID’s existing sphere designation
to include A-1’s Oakridge Estates; actions identified in the preceding section as Option Two.
These actions – most notably – would serve to signal the Commission’s interest and intent in
prioritizing the existing need for water and sewer services within the lands as well as their
social and economic ties to NBRID in choosing to add the approximate 130 acres to the
sphere. Further, these actions would orient the sphere to explicitly reflect NBRID’s present
service area, and in doing so, eliminate the current policy inference of the Commission that
the affected lands – irrespective of their connectivity to the water and sewer systems – be
detached. It is also recommended all other outstanding policy considerations – specifically
whether to expand the sphere to match the remaining jurisdictional boundary or alternatively
pursue detachment proceedings – be tabled to the next scheduled update.
11
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
The following written statements support the recommendation to update NBRID’s sphere
of influence to add Oakridge Estates as required under G.C. Section 56425.
• Present and Planned Land Uses in the Area
The County of Napa’s adopted land use policies provide for the current and future
residential uses characterizing the majority of the recommended sphere. The
commercial recreational uses – although currently dormant and a product of the
Bureau’s land ownership – characterizing the remainder of the recommended sphere
have been tenured over the last several decades and consistent with uses throughout
the Lake Berryessa shoreline. These present and planned uses are compatible with
NBRID’s water and sewer services. There are no agricultural lands and limited
open-space lands within the recommended sphere as defined under LAFCO law.
• Present and Probable Need for Public Services in the Area
There is a present need for NBRID’s water and sewer services throughout the
recommended sphere to support the existing and continued development of the
Berryessa Highlands community and its estimated 920 residents. These services are
also needed in anticipation and support of the expected redevelopment and opening
of the former Steele Park Resort site.
• Present Capacity and Adequacy of Public Services Provided by the Agency
The Commission’s recently completed municipal service review on the Lake
Berryessa region indicates NBRID’s water services are sufficiently capacitated to
meet both existing and projected needs in the recommended sphere with the
exception of increasing storage and treatment facilities to accommodate peak day
demands at buildout. The municipal service review concludes sewer services,
however, are not adequately capacitated and require immediate and substantial
improvements to meet existing needs in the recommended sphere; a conclusion
independently supported by an existing State moratorium prohibiting NBRID from
issuing any new sewer service connections. NBRID’s ability to address these and
other improvements are constrained by the District’s ongoing fiscal distress tied to
operating aging infrastructure in a confined area characterized by modest annual
growth increases along with the loss – temporary or permanent – of its largest water
and sewer user at the former Steele Park Resort site.
• Existence of Relevant Social or Economic Communities of Interest
The affected territory within the recommended sphere has established strong social
and economic interdependencies with NBRID distinct from neighboring areas and
agencies. These ties are affirmed and strengthened by this update.
• Present and Probable Need for Water, Sewer, or Fire Protection for Any
Disadvantaged Unincorporated Communities in the Area
Lands within the recommended sphere do not qualify as disadvantaged
unincorporated communities under LAFCO law.
12
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
This page has been left intentionally blank for photocopying
13
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
III. AGENCY PROFILE
1.0 Background
1.1 Formation Proceedings
NBRID was formed in 1965 as a dependent special
Napa Berryessa Resort
district governed by the County of Napa Board of Improvement District
Supervisors. NBRID’s formation was approved by the Date Formed: 1965
Commission at the request of the principal landowner, Government Code
Enabling Legislation:
25210.1-25217.4
Berryessa Highlands Development Company, and with
Services Provided: Water and Sewer
the support of the County to provide a range of
Estimated Population: 920
municipal services for the development of “Berryessa
Highlands;” a planned residential/commercial community located along the southern
shoreline of Lake Berryessa in east Napa County.14 It was initially expected – and similar to
other approved projects in the region – Berryessa Highlands would develop over several
subdivision phases to accommodate both permanent and seasonal uses; the latter of which
was primarily tied to the expansion and development of Steele Park Resort.15 It was also
expected that governance would eventually transition from the Board of Supervisors to
registered voters within Berryessa Highlands. In all, the buildout of Berryessa Highlands was
expected to include 4,000 residential units with a fulltime population of 6,500.
1.2 Development Activities
Actual development within Berryessa Highlands has
been limited to date to include three distinct subdivisions
with a current estimated resident population of 920.16
The first two subdivisions were developed immediately
following NBRID’s formation and entailed the creation
of “Unit One” and “Unit Two,” which involved the
creation of 202 and 359 single-family lots, respectively.
Notably, only 349 out of the 561 total lots within Units
One and Two have been constructed to date. HIGHLANDS /
UNIT ONE
Development within Unit One also includes the former
Steele Park Resort site. The third subdivision was developed in the early 1980’s with the
creation of a 10-lot subdivision known as “Oakridge Estates;” eight of which have been
constructed to date.17 Reasons for the lack of actual development within Berryessa
Highlands appear to be attributed to three related factors. First, the demand for primary and
secondary homes in the region has not materialized as expected. Second, the County
amended its land use policies, among other factors, to discourage further development along
Lake Berryessa’s shoreline beginning with the adoption of the County’s first general plan in
1975. Third, NBRID has been prohibited from providing any services other than water and
sewer as a result of an amendment to its principal act taking affecting in 1971.
14 Actual slope within NBRID is identified to have a range of 435 to 1,300 feet above sea level.
15 The Steele Park Resort, along with six other resorts, was developed in the late 1950s following an agreement with the County to provide
recreational and commercial services to the public at Lake Berryessa. At the time of NBRID’s formation, Steele Park Resort was
expected to develop into a year-round resort facility and include approximately 150 campsites, a 24-room motel, and a retail center
outfitted with a grocery store, restaurant, and bait-and-tackle shop. In 1975, administrative duties concerning recreational development
at Lake Berryessa were later assumed by the U.S. Department of the Interior, Bureau of Reclamation.
16 The referenced population estimate was calculated by the Commission based on an earlier regional municipal service review.
17 Services to Oakridge Estates were established in 1982 and facilitated through an intertie to the main distribution and collection systems.
14
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
1.3 Financial Issues
The limited amount of actual development within NBRID serves as the key attribute in
explaining the prolonged and ongoing fiscal challenges underlying District operations;
challenges the Commission first noted in establishing a sphere of influence for NBRID in
1985 as detailed in the succeeding section. This dynamic produces diseconomies of scale in
which service costs are spread out among a limited number of users leading to an average
monthly charge for water and sewer services of $217 and is one of the highest monthly totals
in Napa County. The effect of the diseconomies of scale is highlighted by NBRID finishing
each of the last five fiscal years evaluated in the recent municipal service review with
negative end-of-year balances; all of which has contributed to the District beginning the
current fiscal year with a negative fund balance of ($0.77 million). The effect of the
diseconomies of scale is also present relative to NBRID continuing to operate aging
infrastructure and has resulted – among other issues – in the Regional Water Quality Control
Board (RWQCB) issuing three separate cease and desist orders between 1995 and 2010 for
repeated unauthorized sewage spills into Lake Berryessa. Importantly, NBRID is restricted
from establishing new sewer connections and is under the directive to construct a new sewer
treatment facility before December 2015.
Another pertinent factor underlying NBRID’s finances – specifically its ability to fund
capital improvements to both utility systems – is tied to uncertainties associated with the
United States Bureau of Reclamation’s (Bureau) pending redevelopment plans for the former
Steele Park Resort site and its potential impact on a voter-approved assessment.18 These
uncertainties began in earnest in 2009 when the seven resort sites operating along the Lake
Berryessa shoreline were closed as all concessionaire contracts expired. Bureau awarded a
new 40-year concessionaire contract in 2010 to the Pensus Group and tasked the contractor
– among other directives – to redevelop the former Steele Park Resort site for short-term
vacation uses. Subsequent disagreements, however, between the two parties ensued with
respect to implementing an actual development plan for the former Steele Park Resort site
and culminated with Bureau terminating the concessionaire contract in December 2012.
The termination of the contract is particularly pertinent to NBRID given the former Steele
Park Resort site – when previously operating – represented close to one-third of the
District’s annual service demands and generated an equivalent percentage of its annual
operating revenue. The termination of the contract, notably, culminated with the effective
cancellation of a $13.9 million bond measure approved by NBRID voters in April 2007 to
make expansive improvements to both water and sewer systems, but never enacted due to
the referenced disputes involving the Pensus Group.19 NBRID voters approved a new $10.0
million bond measure in 2012 to be secured by a special assessment levied against all lands
within NBRID and calculated based on expected benefit from the system-wide
improvements; none of which is specifically tied to the former Steele Park Resort site.20
18 The majority of services at Steele Park Resort were closed in May 2008. Bureau reports limited services were provided through early
2010 through an interim contract between the Bureau and the previous concession contractor. This concession site has been left
undeveloped since early 2010 due to complications in Bureau’s competitive bid process for new contractors to assume control.
19 The 2007 bond measure was secured by a special assessment applying an annual $563.96 charge for every dwelling unit over a 30 year
period. At the time the bond measure was approved by voters, it was expected Steele Park Resort/Lupine Shores Resort would include
228 equivalent dwelling units. The Pensus Group’s development plan, however, anticipated only the equivalent of 88 dwelling units.
20 The 2012 bond measure is secured by a special assessment applying an annual $1,029.10 charge for every dwelling unit over a 39 year
period. This bond measure excludes the former Steele Park Resort site from the special assessment given the expectation there will be
no water or sewer services provided by NBRID to the site in the near term. Expected benefit from the assessment for Oakridge Estates
properties is calculated as equivalent dwelling units based on lot sizes. Bureau has recently reached out to the concessionaire operators
for Markley Cove and Pleasure Cove with respect to inquiring whether they would have an interest in assuming a short-term contract to
15
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
1.4 Reorganization Approval
In April 2011, the Commission initiated and approved the expedited reorganization of
NBRID into a new community services district (“NBCSD”) with the same boundary, duties,
powers, assets, and liabilities.21 22 Approval of the reorganization was consistent with the
recommendation of the earlier municipal service review prepared on the region and intended
to serve two distinct Commission objectives. First, reorganization would position NBCSD
to become more responsive to changes in constituent needs by having the power – subject
to subsequent Commission approval – to provide additional municipal services in support of
Berryessa Highlands’ continued development. Second, reorganization would improve public
accountability by facilitating the delegation of responsibilities in planning for the present and
future service needs of the community from the County to local residents. Specifically, the
Commission approved reorganization with the explicit expectation it would directly lead
NBCSD to call and conduct an election to replace the County Board of Supervisors with
registered voters as the governing board. Approval is conditioned on NBRID executing
water and sewer service contracts with the approved concessionaire for the former Steele
Park Resort site: a condition requested by NBRID and intended to help ensure the
reorganized District will have sufficient revenue sources going forward.23 The Commission
recently extended the condition deadline from April 2012 to December 2017.24
2.0 Current Activities
NBRID has a current operating budget of $1.77 million. This amount covers all approved
operating expenses for both the water and sewer systems. An approximate ($0.06 million)
operating deficit has been budgeted for the current fiscal year; a marked improvement over
previous fiscal years and the result of a recent ratepayer increase. NBRID’s audited
undesignated/unreserved fund balance at the beginning of the current fiscal year totals
approximately ($0.77 million) and tied to perennial operating losses incurred over the last
several years. The majority of administrative services are provided directly by the County
Public Works Department with operations & maintenance services provided by a contractor,
Phillips and Associates.25
NBRID’s jurisdictional boundary covers approximately 2.9 square miles or 1,896 acres.26 No
changes have been made to the jurisdictional boundary since NBRID’s formation in 1965.
There are currently 350 metered water connections and 351 metered sewer connections. All
connections are located within the jurisdictional boundary and support 358 developed single-
family residences with an estimated population of 920.
operate the former Steele Park Resort site. Bureau has also pledged a presently unknown quantity of investment funding for facility
upgrades to the site to assist a short-term contractor in assuming and opening recreational activities.
21 Approving NBRID’s reorganization was not subject to protest proceedings given the application of Government Code Section 56853.5;
special legislation allowing LAFCOs to expeditiously reorganize resort improvement districts into community service districts without
protest and election as long as the affected agencies consent and the proceedings are initiated by January 1, 2018.
22 Liabilities to be transferred from NBRID to NBCSD include any bonded indebtedness associated with the special assessment passed by
District voters in 2012. The assessment is based on lot sizes for purposes of assigning equivalent dwelling units to Oakridge Estates.
23 The condition addresses a discrepancy between resort improvement district and community services district laws as it relates to the
ability of an affected district to require a landowner to connect to a public water system. A resort improvement district is authorized to
require water and sewer connection of any landowner while a community services district has only the power to require connection to
the sewer system.
24 The approved extension of the condition deadline to December 2017 corresponds with the sunset date provided for the expedited
reorganization proceedings under G.C. Section 56853.5.
25 NBRID also receives legal and accounting services from County Counsel and the Auditor’s Office, respectively.
26 There are approximately 620 parcels lying in NBRID with an overall assessed value of $83.2 million. A review of the database
maintained by the County Assessor’s Office indicates only 352 of the parcels have been developed as measured by the assignment of
situs addresses. It is estimated only two-fifths of the total land acres within NBRID have been developed.
16
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
3.0 Sphere of Influence
3.1 Establishment
NBRID’s sphere was established to include
approximately 510 acres by the Commission in
June 1985. This action was prompted by earlier
legislation requiring LAFCOs to establish spheres
for all cities and special districts within their
jurisdictions by December 1985.27 Pertinently, in
considering the establishment of a sphere, the
Commission formally noted its concerns
regarding NBRID’s long-term financial viability
given the lack of actual development as well as a
persistent structural imbalance in which annual
expenses were continually exceeding annual
revenues. The Commission also noted concerns
regarding NBRID’s sewer capacity and
determined immediate improvements were
needed to replace the aging and deteriorating
system. The Commission, given these
considerations, established NBRID’s sphere to
include only parcels lying in Units One and Two
along with a limited number of adjacent lands
expected to be developed for residential or public
recreational uses over the next 10 year period.28
The Commission also directed future resources to
create a subcommittee to explore reorganizing
NBRID into a community services district in order for the District to also provide garbage,
fire, and street services. Further, the Commission directed NBRID to take action to initiate
detachment proceedings involving the jurisdictional lands excluded from the sphere.
3.2 Amendments and Updates
The Commission affirmed NBRID’s existing sphere designation with no changes as part of a
scheduled update in 2007.29 The update was prepared in conjunction with two earlier
municipal service reviews examining countywide water and sewer provision, both of which
included determinations noting the need for NBRID to make a number of immediate
infrastructure improvements along with stabilizing its financial solvency. The Commission
also noted in both municipal service reviews the need to explore regional reorganization
opportunities given pervasive service challenges among all three special districts serving the
Lake Berryessa shoreline. To this end, the Commission deferred considering any sphere
changes for the affected agencies in the region – including NBRID – until completion of
additional analysis regarding reorganization/consolidation opportunities.
27 Assembly Bill 498 (Cortese); Signed, Chapter 27, Statutes of 1983.
28 There are a total of 1,387 jurisdictional acres encompassing 67 entire or portions of parcels in NBRID lying outside the sphere.
29 The referenced update was preceded by new legislation requiring LAFCOs to review and update all city and special district spheres by
2008 and every five years thereafter.
17
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
4.0 Planning Factors
NBRID operates entirely under the land use
authority of the County. Its jurisdictional
boundary anchor – Berryessa Highlands – is one
of 15 distinct unincorporated communities
identified under the County General Plan. It is
estimated the resident population within
Berryessa Highlands (920) accounts for less than
four percent of the overall unincorporated
population (26,567) in Napa County. The
nearest incorporated communities to Berryessa NBRID
Highlands are Napa (Napa County) and Winters
(Yolo County) at approximately 20 to 25 miles
to the southwest and east, respectively.
It is estimated over three-fifths of land within
NBRID’s jurisdictional boundary is currently
undeveloped/unimproved and mostly comprises
natural chaparral or types of native vegetation.
The remaining two-fifths of jurisdictional lands
are principally developed with single-family
residences in Units One (189) and Two (160).
There also remains the former Steele Park Resort site within NBRID’s jurisdictional
boundary, which presently is being directly operated by Bureau and provides free public
access to the boat launch and shoreline.30
4.1 Land Uses Within Boundary
All lands within NBRID are divided between
two distinct designations under the County
General Plan: Rural Residential and Agriculture,
Watershed, and Open Space.
• Jurisdictional lands designated as Rural
Residential apply to approximately one-fifth
of NBRID’s jurisdictional boundary and
predominantly cover Berryessa Highlands’
Units One and Two. The designation is
intended to accommodate low density
residential uses that are in proximity to
existing urbanized areas that are either in
agriculture or where further parcelization
shall be discouraged. The minimum lot
density is 10 acres and, as a result,
precludes any further divisions in NBRID
based on existing lot sizes.
30 Bureau operates the former Steele Park Resort site Monday through Sunday from 7:00 A.M. to 5:00 P.M..
18
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
• Jurisdictional lands designated as Agriculture, Watershed, and Open Space apply to
approximately four-fifths of NBRID’s jurisdictional boundary and cover mostly
undeveloped/unimproved lands with the exception of the segment of Unit One
dedicated to the former Steele Park Resort site and the Oakridge Estates. This
designation is intended to support the preservation of existing agricultural and open
space uses and prescribes a minimum lot density of 160 acres. This designation
precludes any new land division within NBRID based on existing lot sizes with the
exception of a single parcel near the northern perimeter.31
4.2 Land Uses Outside Boundary
All external lands immediately adjacent to
NBRID’s jurisdictional boundary are
designated for non-urban uses under the
County General Plan as Agriculture, Watershed,
and Open Space and subject to the referenced
160 acre minimum lot density. The pervasive
land uses within these adjacent lands involve
undeveloped/unimproved open space
characterized mostly by chaparral and other
types of natural vegetation. There are a
limited number of rural residences to the
south and west located along Rimrock and
Headlands Drives.32 The closest
unincorporated area to NBRID with a land
use designation other than Agriculture,
Watershed, and Open Space is approximately 10
miles southwest along Steele Canyon Road and
involves the Moskowite Corner community.33
IV. DISCUSSION
1.0 Objectives
The basic objective of this report is to identify and evaluate areas warranting consideration
for inclusion or removal from NBRID’s sphere as part of a scheduled update. Underlying
this effort is to designate the sphere in a manner the Commission independently believes will
facilitate the sensible and timely development of the District consistent with the objectives
of the Legislature codified in CKH (emphasis added). Specific goals under this legislation
include discouraging urban sprawl, preserving open space and prime agricultural lands, and
providing for the efficient extension of governmental services.
31 All jurisdictional lands within NBRID are zoned by the County as either Agriculture Watershed, Planned Development, or Residential Country.
32 The Bureau of Reclamation owns the majority of lands immediately to the north and west of NBRID’s jurisdictional boundary.
33 Moskowite Corner is designated by the County as Rural Residential.
19
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
The Commission’s “Policy Determinations” were comprehensively updated in 2011 and
provide general prescription in fulfilling its legislative objectives paired with responding
appropriately to local conditions and circumstances. The Policy Determinations highlight
the Commission’s commitment to avoid the premature conversion of important agricultural
or open space lands for urban uses through a series of restrictive allowances. This includes a
broad prescription to exclude lands designated as agricultural or open space from city and
special district spheres for purposes of accommodating urban development with limited
exceptions. An additional determination states the Commission’s support for Measure “P”
by assigning deference to the County General Plan as it relates to determining agricultural
and open space land use designations unless special circumstances merit otherwise.34
2.0 Timeframe
State law currently requires LAFCOs to review and update each local agency’s sphere by
January 1, 2008 and every five years thereafter as needed. Accordingly, it has been the
practice of the Commission to update each local agency’s sphere in a manner emphasizing a
probable five-year boundary/service area; actual annexation approval, however, is dependent
on the Commission determining whether the specific timing of a proposed boundary change
is appropriate.35 This update’s analysis is consistent with this practiced timeframe.
V. STUDY CATEGORIES
1.0 Criteria
This report and its analysis on potential sphere modifications for NBRID is predicated on
the core policy interest of the Commission to consider the District’s existing prescribed role
in providing public water and sewer services in support of the Berryessa Highlands
community.36 This involves, most pertinently, considering the community’s need for
NBRID’s services relative to the District’s ability to provide these services consistent with
the Commission’s interests. Information collected and analyzed in the Commission’s recent
municipal service review on the Lake Berryessa region is incorporated herein.
2.0 Selection
Based on the criteria outlined in the preceding paragraph, one study category – “A” – has
been selected for evaluation in this report for possible inclusion into NBRID’s existing
sphere. This study category has been selected for review given it represents lands totaling
1,387 acres that are all existing jurisdictional lands lying outside the current sphere. Further,
based on ownership factors, this study category is divided into two distinct subareas labeled
“A-1” and “A-2.” A map depicting the study category and its two subareas follows.
34 Measure P – formerly Measure J – was initially enacted by Napa County voters in 1990 and prohibits the County from amending
agricultural or open space land use designations for urban uses without electorate approval through 2050. Measure P only applies to
unincorporated lands.
35 LAFCOs are directed to consider 15 specific factors under G.C. Section 56668 anytime it reviews a proposed boundary change for
purposes of informing the appropriateness of the action. Additionally, it is Commission policy to discourage annexations to cities and
districts involving undeveloped or underdeveloped lands without a known project or development plan.
36 The recent municipal service review noted there may be need/benefit for reorganizing NBRID into a community services district (CSD)
to, among other things, provide additional elevated governmental services within the Berryessa Highlands community; most specifically
public fire protection, roads, and recreation services. The municipal service review concluded it would be appropriate to immediately
initiate a transition for NBRID to reorganize into a CSD.
20
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
It is important to note the report does not identify any areas lying outside NBRID’s current
jurisdictional boundary for possible inclusion into the District’s sphere. The decision not to
consider expanding the sphere beyond NBRID’s jurisdiction appears appropriate at this time
given the uncertainties of whether the Commission’s terms for approving the District’s
reorganization will be completed by the December 2017 deadline; terms dependent on a
concessionaire assuming control and operations at the former Steele Park Resort site.
Irrespective of these comments, and for purposes of serving as a placeholder for a future
review, there may be merit to at least one future sphere amendment outside the current
jurisdictional boundary involving an approximate 20 acre lot located at 9625 Steele Canyon
Road.37 This lot lies immediately adjacent to NBRID and the District maintains an easement
to cross the property in order to access a sewer disposal facility. The landowner has
previously contacted LAFCO to express interest in annexing the lot to establish water
service for the purpose of facilitating the construction of a single-family residence for use as
a second residence.
37 The referenced lot is identified by the County of Napa Assessor’s Office as 019-220-028.
21
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
VI. ANALYSIS
1.0 Evaluation Factors
The evaluation of the study category and its two subareas selected for review as part of this
scheduled sphere update for NBRID is organized to focus on addressing the five factors the
Commission is required to consider anytime it makes a sphere determination under CKH.
These five factors are: (a) present and planned uses; (b) present and probable need for public
facilities and services; (c) present adequacy and capacity of public services; (d) existence of
any social or economic communities of interest; and (e) if the agency provides water, sewer,
or fire protection, present and probable need for these services for any disadvantaged
unincorporated communities. Conclusions are offered for each subarea relative to
evaluating the preceding factors along with incorporating the policies of the Commission in
administering LAFCO law in Napa County. This includes, in particular, considering the
merits of any proposed changes relative to the Commission’s four basic and interrelated
policies in determining the appropriate constitution of a special district sphere as
summarized below.
• The location of a special district’s sphere shall serve to promote appropriate urban
uses as independently determined by the Commission with limited exceptions.
• A special district’s sphere should reflect existing and planned service capacities based
on information independently analyzed by the Commission.
• Lands designated for agricultural or open space uses shall not be included in a special
district’s sphere for purposes of facilitating urban development unless unique and
merited circumstances exist as determined by the Commission.
• A special district’s sphere shall guide annexations within a five-year planning period.
Inclusion of land within a sphere, however, shall not be construed to indicate
automatic approval of a subsequent annexation proposal; annexations will be
considered on their own merits with deference assigned to timing.
2.0 Study Category A
2.1 Subarea A-1
A-1 comprises privately owned lands located within NBRID’s jurisdictional boundary that lie
outside the District’s sphere. This continuous subarea lies entirely east of the existing sphere
and totals 1,147 approximate acres with all or portions of 66 lots. The subarea is
distinguished by having two panhandles emanating to the west and north of its core area.
Two public roadways – Headlands and Rimrock Drives – provide access to the subarea’s
core and western panhandle; no public roadways serve the eastern panhandle. Topography
in the subarea varies from an approximate low of 500 feet near the shoreline to a high of
1,250 feet above sea towards the southeast and into the foothills of nearby Wragg Ridge.
22
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
Present and Planned Uses
A-1 is partially developed and highlighted by 15 single-family residential lots with an
estimated resident population of 38. The majority of the developed lots – eight – are
located within the Oakridge Estates subdivision; an area comprising the western
panhandle section and situated along the terminus of the community’s main access road:
Steele Canyon Road. A commercial vineyard/winery also lies in the western panhandle
(St. Barthelemy Cellars). The remaining developed residential lots are generally located
in the subarea’s core area along Headlands Drives. The remaining portion of the subarea
is undeveloped with minimal improvements that are limited to private roads and gates.
The application of the County’s land use policies prohibits any additional land division
with the subarea. These land use policies, however, would allow for each existing lot to
be developed to include a single-family residence so long as other factors comply
(i.e. slope limitations and proof of water/sewer provision).38 Accordingly, further
development opportunities within the subarea include an additional 50 single-family
residences and an accompanying resident population estimate of 125. It is reasonable to
assume, nonetheless, the probability of new development within the subarea in the near
term is unlikely based on recent trends.
Present and Probable Need for Public Facilities and Services
The present need for NBRID’s public services within the subarea is limited to the eight
developed lots within the Oakridge Estates Subdivision; lots currently connected and
dependent on NBRID’s water and sewer systems. It would be reasonable to assume
there remains a potential need for water service within some/all of the remaining lots
within the subarea if and when development occurs given evidence of inconsistent
groundwater supplies. The extension of NBRID’s sewer services within the rest of the
subarea, however, does not appear now or into the probable future given the relatively
large lot sizes presumably provide sufficient space to maintain private septic systems
without elevated risk of public health or safety threats.
Present Adequacy and Capacity of Public Services
A detailed review of the adequacy and capacity of NBRID’s public water and sewer
services was performed in the Commission’s recently completed municipal service
review on the Lake Berryessa region. The municipal service review indicates NBRID
has adequate water supply and related infrastructure to accommodate existing and
probable demands within its current service area – which includes the Oakridge Estates
Subdivision – into the foreseeable future. NBRID’s water system would require modest
to expansive infrastructure improvements to extend to the remaining portion of the
subarea; the cost of which would need to be collectively borne by the landowners.
Additionally, the potential buildout of the remaining subarea would further increase the
District’s peak day demand beyond its existing day storage and treatment capacities and
therefore require related facility improvements. Existing deficiencies with NBRID’s
sewer collection and storage capacities detailed in the municipal service review have
culminated in an ongoing moratorium on new connections by RWQCB.
38 County land use policies would also allow for one guest cottage per existing lot.
23
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
Existence of Any Social or Economic Communities of Interest
The entire subarea has established and maintained substantive social and economic ties
with NBRID given the lands’ existing inclusion within the District’s jurisdictional
boundary. The inclusion of the subarea in the jurisdictional boundary, specifically,
reflects a standing governance assumption originally established by the Commission that
the affected lands, as they develop, are to be served by NBRID. Other relevant and
tying factors include all of the affected lands’ ongoing contribution of property tax
proceeds, which help to fund NBRID’s general operations. Moreover, these preceding
ties are particularly accentuated for the Oakridge Estates subdivision given eight of the
ten lots are already connected to NBRID’s water and sewer systems and therefore
subject to all past and existing assessments and user charges. Irregardless of the these
comments, the County’s subsequent redesignation and rezoning of the subarea for non-
urban uses following NBRID’s formation has changed and weakened the affected lands’
social and economic ties to the District. These changes in land use policies for the
subarea, in particular, have created a disconnect with respect to a special district with
urban type service powers for lands now planned for non-urban uses. The Commission
previously deferred to these changes in land use policies – among other factors – in
choosing to exclude the subarea from NBRID’s sphere.
Present and Probable Need for Water, Sewer, or Fire Protection for Any
Disadvantaged Unincorporated Communities
The subarea does not qualify as disadvantaged unincorporated communities under
LAFCO law. No further analysis is required.
GENERAL CONCLUSIONS
The addition of A-1 to the sphere appears merited if the Commission’s preference is to
assign deference to the affected lands’ existing social and economic ties to NBRID as a
result of their standing inclusion in the District. Adding the portion of the subarea
comprising the Oakridge Estates would be further merited given the area’s present
residential land uses and connectivity to NBRID’s water and sewer systems. It would
be appropriate, nonetheless, to continue to exclude this subarea less the Oakridge
Estates from the sphere if it is the Commission’s preference to assign deference to one
or more of the other policy factors – such as consistency with land uses and service
plans – addressed in the accompanying analysis. An expanded discussion on these
conclusions and other related issues is provided in the Executive Summary.
24
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
2.2 Subarea A-2
A-2 comprises lands publically owned and located within its jurisdictional boundary, but lie
outside the sphere. This subarea comprises two non-contiguous sites totaling approximately
240 acres with all or portions of five lots. The larger of the two sites includes four lots
owned by Bureau and generally consists of shoreline tied to the former Steele Park Resort
site and hereafter referred to as the “Bureau lands.” Access to the Bureau lands is provided
by Steele Canyon Road and Lakeshore Drive. Topography is relatively flat and peaks at 600
feet above sea. The smaller of the two sites – which is entirely surrounded by the other
subarea – includes a single lot owned by NBRID. This smaller site is hereafter referred to as
“NBRID lands” and is the location of one of the District’s potable water storage tanks.
Access to the Bureau lands is limited to a private road. Topography within the smaller site
slopes slightly and peaks at 1,150 feet above sea.
Present and Planned Uses
Nearly all of the land comprising Bureau lands is undeveloped with limited
improvements associated with the adjacent former Steele Park Resort site. This includes
scenic walking paths and unpaved roads along with some auxiliary facilities tied to
various recreational activities (i.e. picnic tables, benches, etc.). It is anticipated the
Bureau lands will be redeveloped and potentially intensified in step with the anticipated
development plans tied to the former Steele Park Resort site; actual uses and timeline,
however, are unknown at this time. The NBRID lands are also undeveloped though
improved to include the District’s 500,000 gallon potable water storage tank, which
serves Unit One.
Present and Probable Need for Public Facilities and Services
There is no present need for NBRID’s public water and sewer services within either of
the two sites comprising the subarea given current land uses. It would be reasonable to
assume the probable future need for services is also limited with the possible exception
of the Bureau lands and dependent on the type and extent of any future redevelopment
associated with the former Steele Park Resort site.
Present Adequacy and Capacity of Public Services
A detailed review of the adequacy and capacity of NBRID’s water and sewer services
was performed in the Commission’s recently completed municipal service review on the
Lake Berryessa region. The municipal service review indicates NBRID has adequate
water supply and related infrastructure to accommodate existing and probable demands
within its current service area into the foreseeable future; a service area that does not
include the subarea. The extension of water service into the subarea and specifically to
the Bureau lands given its potential need may require facility improvements given
NBRID is already operating at or near its storage and treatment capacities in
accommodating peak day demands. Additionally, any extension of water service to
Bureau lands would generate moderate to expansive line infrastructure improvements
with the cost needing to be borne by the Bureau. Existing deficiencies with NBRID’s
sewer collection and storage capacities detailed in the municipal service review have
culminated in an ongoing moratorium on new connections by RWQCB.
25
Sphere of Influence Review and Update: Napa Berryessa Resort Improvement District LAFCO of Napa County
Existence of Any Social or Economic Communities of Interest
The entire subarea has established substantive social and economic ties with NBRID
given the lands’ existing inclusion within the District’s jurisdictional boundary. The
inclusion of the subarea in the jurisdictional boundary, specifically, reflects a standing
governance assumption originally established by the Commission that the affected lands,
as they develop, are to be served by NBRID. Irregardless of the above comments, and
similar to the other subarea reviewed in this update, the County’s subsequent
redesignation and rezoning of this subarea for non-urban uses following NBRID’s
formation has changed and weakened the affected lands’ social and economic ties to the
District. These changes in land use policies for the subarea, in particular, have created a
disconnect with respect to a special district with urban type service powers for lands now
planned for non-urban uses. The Commission previously deferred to these changes in
land use policies – among other factors – in choosing to exclude the subarea from
NBRID’s sphere.
Present and Probable Need for Water, Sewer, or Fire Protection for Any
Disadvantaged Unincorporated Communities
The subarea does not qualify as disadvantaged unincorporated communities under
LAFCO law. No further analysis is required.
GENERAL CONCLUSIONS
The addition of A-2 to the sphere appears merited if it is the preference of the
Commission to assign deference to the affected lands’ existing social and economic ties
to NBRID as a result of their standing inclusion in the District. It would be
appropriate, nonetheless, to continue to exclude the subarea from the sphere if it is the
Commission’s preference to assign deference to one or more of the other factors –
such as consistency with land uses and service plans – addressed in the accompanying
analysis. An expanded discussion on these conclusions and other related issues is
provided in the Executive Summary.
26