LAFCO
Napa County Flood Control and Water Conservation District MSR (2007)
Read the report at Local Agency Formation Commissions ↗
LOCAL AGENCY FORMATION COMMISSION OF NAPA COUNTY
NAPA COUNTY FLOOD CONTROL AND
WATER CONSERVATION DISTRICT
MUNICIPAL SERVICE REVIEW
Final Report
June 2007
Prepared by:
LAFCO of Napa County
Committed to serving the citizens and government agencies of its
jurisdiction by encouraging the preservation of agricultural lands and
open-space and coordinating the efficient delivery of municipal services.
Jack Gingles, Chair, City Member
Brad Wagenknecht, Vice-Chair, County Member
Bill Dodd, Commissioner, County Member
Juliana Inman, Commissioner, City Member
B
C
r
in
ia
d
n
y
J
C
. K
of
e
f
l
e
l
y
y
,
,
A
C
l
o
t
m
er
m
na
i
t
s
e
s i
C
o
o
n
m
er
m
, P
is
u
s
b
i
l
o
i
n
c
e
M
r,
e
C
m
it
b
y
e
M
r
ember g e
ncyFormation
C
o m
A m
Mark Luce, Alternate Commissioner, County Member al is
Gregory Rodeno, Alternate Commissioner, Public Member o c s io
L n
Keene Simonds, Executive Officer
Jackie Gong, Commission Counsel
T
K
r
a
a
t
c
h
y
y
G
M
e
a
r
b
ag
ry
h
,
t y
C
,
o
A
m
n
m
al
i
y
ss
s
i
t
o n Secretary
NapaCounty
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
This page has been left intentionally blank
2
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
INTRODUCTION
Local Agency Formation Commissions
Local Agency Formation Commissions (LAFCOs) were established in 1963 and are
responsible for administering California Government Code §56000 et seq., which is now
known as the Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000.
LAFCOs are delegated regulatory and planning responsibilities to encourage the orderly
formation and development of local governmental agencies, preserve agricultural and
open-space lands, and to discourage urban sprawl. Duties include regulating
governmental boundary changes through annexations or detachments, approving or
disapproving city incorporations, and forming, consolidating, or dissolving special
districts. LAFCOs are also responsible for conducting studies that address a range of
service and governance issues to inform and direct regional planning activities and
objectives. LAFCOs are located in all 58 counties in California.
Municipal Service Reviews
On January 1, 2001, the Cortese-Knox-Hertzberg Local Government Reorganization Act
became the governing law of LAFCOs. One change brought by this legislation was the
creation of a new LAFCO function, the municipal service review. California
Government Code §56430 states that prior to any update of a sphere of influence, the
Commission shall conduct a municipal service review – a comprehensive evaluation of
the ability of the agency to provide service within its existing jurisdiction and sphere.
This includes making determinations on the adequacy, efficiency, and effectiveness of
these services in relationship to local conditions and circumstances. LAFCO is required
to review and update each local agency’s sphere by January 1, 2008 and every five years
thereafter as necessary. Each of the 58 LAFCOs in California may adopt their own
approach to fulfilling the service review and sphere update requirements.
As part of the service review process, LAFCOs are required to consider and make written
determinations with regard to nine service factors enumerated under California
Government Code §56430. These factors are intended to capture the legislative intent of
the service review process and offers LAFCO key information to inform policy
determinations necessary to complete a sphere update. These factors are:
1. Infrastructure needs or deficiencies.
2. Growth and population projections for the affected area.
3. Financing constraints and opportunities.
4. Cost avoidance opportunities.
5. Opportunities for rate restructuring.
6. Opportunities for shared facilities.
7. Government structure options.
8. Evaluation of management efficiencies.
9. Local accountability and governance.
3
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
Napa County Flood Control and Water Conservation District
This report represents the municipal service review of the Napa County Flood Control and
Water Conservation District. The underlying objective of the report is to review the level
and range of services provided by the District in terms of capacity, funding, and
governance. The report also includes written determinations that address the nine service
factors LAFCO is required to consider as part of its service review mandate under
California Government Code §56430.
Note: The geographic region of the municipal service review includes all lands located
within and in close proximity to the existing jurisdictional boundary of the Napa
County Flood Control and Water Conservation District (depicted in Attachment A).
4
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
OVERVIEW
The Napa County Flood Control and Water Conservation District (NCFCWCD) was
established in 1951 by a special act of the California Legislature. The District’s
formation was engendered by the County of Napa for the purpose of creating a separate
government entity responsible for developing and managing domestic water supplies and
controlling flood and storm waters in Napa County. Notably, the formation of the
District enabled the County to begin participating in government programs and joint-use
activities to augment and enhance local water supplies and obtain federal and state
assistance to finance flood control projects.
Since its formation, NCFCWCD has developed two principal and distinct service
activities with respect to water conservation and flood control. The District’s water
conservation services primarily involve administering contracts with the State of
California and the United States Bureau of Reclamation for annual water supply
entitlements from the State Water Project and the Solano Project, respectively. As part
of its administrative duties, the District subcontracts its imported water supply
entitlements to cities and special districts throughout Napa County. The District’s flood
control services focus on managing and coordinating projects intended to protect local
communities from inundation by maintaining and clearing tributary channels and
sponsoring capital improvements. This includes currently serving as the local sponsor of
the voter-approved “Napa River/Napa Creek Flood Protection Project,” which is
designed to protect the City of Napa from a 100-year flood.
GOVERNANCE
NCFCWCD is organized under the Napa County Flood Control and Water Conservation
District Act of 1951. From 1951 through 1996, the County of Napa Board of Supervisors
acted ex officio as the District’s Board of Directors. In 1996, in preparation for a
countywide vote regarding the Napa River/Napa Creek Flood Protection Project, the
Board was expanded to include 11 members consisting of all five County Supervisors,
the mayors of the five incorporated cities, and a council member from the City of Napa.
The Board is empowered to establish and enforce any rule or regulation deemed
necessary to carryout the business of the District.1 Meetings are conducted on the first
and third Tuesdays of every month at the County of Napa’s Administration Building and
are open to the public.
NCFCWCD is authorized to provide a broad range of services relating to water
conservation and flood control. Specific service powers enumerated under the District’s
legislative act include:
1 In 2003, the Napa County Flood Control and Water Conservation District Act was amended to allow the Board its
own purchasing and resolution powers. Prior to this amendment, the Board followed the policies and procedures of
the County of Napa.
5
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
• Acquire, distribute, and store water for domestic, irrigation, and other beneficial
uses. This includes storing water in surface or underground reservoirs,
conserving and reclaiming water for present and future uses, and appropriating
and acquiring water supplies and water rights. (Section Five, Part Five)
• Control, reclaim, and retain flood and storm waters for beneficial uses. This
includes spreading, storing, or causing water to percolate into the soil. (Section
Five, Part Six)
• Perform studies or analyses as it relates to water supplies, water rights, and the
control of flood and storm waters for beneficial uses. (Section Five, Part Eight)
* NCFCWCD is also authorized to exercise the right of eminent domain to take land,
water, water rights, or other property necessary to carry out its duties. (Section Six)
ADMINISTRATION
NCFCWCD’s legislative act provides that all employees, deputies, and officers of the
County of Napa may be asked to perform their respective duties ex officio for the District.
In 2003, to clarify and expand its administrative authority, the enabling act was amended
to allow the District Board to appoint, employ, or contract with any other persons or
entities as necessary to carry out the duties of the District.
NCFCWCD is presently staffed by the County of Napa Public Works Department. This
arrangement is based on practice and provides that the County Public Works Director
serve as District Engineer. The District Engineer reports to the Board and is responsible
for managing day-to-day activities. There are currently eight County Public Works
employees assigned on a full-time basis to the District, including five that are assigned
specifically to the Napa River/Napa Creek Flood Protection Project. In addition, two
new positions were created in 2005, a Principal Water Resources Engineer and a Water
Resources Specialist, whose duties are split between the District (managing the District’s
water supply contracts) and the County (implementing County “Measure A” 2 projects).
SERVICE AREA AND POPULATION
NCFCWCD’s jurisdictional boundary is approximately 506,517 acres and includes all
incorporated and unincorporated lands in Napa County. This jurisdictional boundary is
coterminous with the District’s sphere of influence, which was established by LAFCO in
1984. The District operates under the land use authority of six agencies, which include
the County of Napa, the Cities of American Canyon, Calistoga, Napa, St. Helena, and the
Town of Yountville. The Association of Bay Area Governments (ABAG) estimates that
there are 133,700 people currently residing in Napa County. ABAG also estimates an
annual population growth rate for Napa County of 0.65 percent over the next 20 years.
2 Measure A was enacted in 1998 and authorizes a half-cent special tax through 2018 for the purposes of funding
specified flood and water quality and enhancement projects in Napa County.
6
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
ABAG Population Projections, 2005-2025
Jurisdiction 2005 2015 2025
American Canyon 14,700 18,300 19,900
Calistoga 5,200 5,300 5,300
Napa 80,100 86,100 89,900
St. Helena 6,100 6,100 6,200
Yountville 3,400 3,500 3,600
Unincorporated 24,200 25,400 26,200
Total 133,700 144,400 151,100
Source: ABAG, Projections 2007
MUNICIPAL SERVICES
Since its formation in 1951, NCFCWCD has developed two principal and distinct service
activities with respect to flood control and water conservation. This includes managing
and coordinating local and countywide flood control projects and administering water
supply contracts with the State of California and the United States Bureau of
Reclamation. A summary of the development and delivery of these services follows.
Flood Control
Upon formation in 1951, NCFCWCD’s flood control activities involved coordinating
small and supplemental projects with local communities. One of the first flood control
projects undertaken by the District involved the purchase and operation of a pump station
to serve the unincorporated community of Edgerly Island.3 Other initial flood control
activities of the District included providing channel maintenance and recording flow
measurements for the Napa River and its tributaries.
Prior to NCFCWCD’s formation, organized flood control activities in Napa County were
primarily the responsibilities of local jurisdictions. However, in 1938, the United States
Congress passed legislation authorizing and funding the Army Corps of Engineers
(USACE) to study flood-hazard waterways throughout the nation for the purpose of
developing and implementing protection plans.4 The Napa River, on record as having
severely flooded more than a dozen times, was among the subjects studied.5
3 The pump station on Edgerly Island was funded through an annual assessment paid by local property owners as part
of a benefit zone established by NCFCWCD in 1952. This benefit zone was dissolved and the pump station was
turned over to the Napa River Reclamation District No. 2109 following its formation in 1975.
4 Following the Great Mississippi Flood of 1927, recorded as the worst flood in United States history, the federal
government began shifting policies toward more aggressive and direct involvement of flood control efforts
throughout the nation. Legislation in 1938 put investigations of flood waters and the construction of flood protection
projects under jurisdiction of the Department of War and directed the Secretary of War to begin the acquisition of all
lands nationally needed for constructing flood control projects.
5 The Flood Control Act of 1944 authorized the construction of thousands of dams and levees across the United States.
For the Napa River, the USACE study recommended channel improvements and construction of a dam on Conn
Creek to establish a water supply reservoir for Napa County. Although this recommended project was authorized as
part of the Flood Control Act of 1944, no appropriations were allocated because of a lack of local funds to help
7
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
As a step toward generating local assessment funds needed for financing USACE
projects, NCFCWCD was formed in 1951 by special legislation at the request of the
County of Napa. In 1965, Congress authorized a new flood protection project for the
City of Napa in conjunction with the USACE and made a standing authorization of
$14.95 million for the project. However, local access to this funding was contingent
upon the completion of a specific project design and designated local matching funds.
With this in mind, by the mid-1970s, the District had set aside approximately $3.0
million as a portion of the local cost-share for the project. Between 1976 and 1977, the
District worked with local officials to generate the remaining matching funds through
sponsoring special tax initiatives. However, after voters rejected two separate tax
initiatives, USACE set aside the flood project for the City of Napa.
In 1977, in response to the failed tax measures, NCFCWCD reduced its tax rate to zero.
One year later, Proposition “13” was passed by California voters curtailing the ability of
the District to increase its tax rate without two-thirds voter approval.
In 1987, a year after a flood caused significant damage in the City of Napa, NCFCWCD
began working with local and federal stakeholders to request assistance from USACE in
developing and funding a comprehensive flood control project. In 1995, dissatisfied with
the design plans developed by USACE, a community coalition emerged and began
working with the District on developing a new flood protection plan. By 1997, the
working group achieved consensus on a new design eventually culminating in the Napa
River/Napa Creek Flood Protection Project.6
In order to fund the Napa River/Napa Creek Flood Protection Project, the County Board
of Supervisors formed a special taxing authority, the Napa County Flood Protection and
Watershed Improvement Authority.7 The “Authority,” whose Board consists of all five
County Board of Supervisors, was established for the purpose of implementing a county-
wide half-cent sales tax to serve as the local match required to receive the federal funds
for the project. These efforts resulted in the drafting of “Measure A,” the Napa County
Flood Protection Sales Tax Ordinance, which was approved by Napa County voters in
1998 and provides funding for specified flood and water quality and enhancement
projects through 2018.8
finance and ultimately maintain the project. (In 1948, the City of Napa funded and constructed a dam on Conn
Creek, which resulted in the creation of Lake Hennessey.)
6 The Napa River/Napa Creek Flood Protection Project affects six miles of the Napa River between Trancas Street on
the north and the Butler Bridge on the south. The project includes riverbank terracing, the removal or replacement of
seven bridges, and the creation of a dry bypass channel at the Oxbow where the Napa River and Napa Creek meet.
Also, floodwalls, levees, and trails will be constructed throughout the project area. The project is designed to reduce
flood levels to the point where water levels in the Napa River and Napa Creek will remain within the designated
floodway during a “100-year” flood event.
7 NCFCWCD does not have the power to impose sale or use taxes.
8 The Napa River/Napa Creek Flood Project is identified as Napa County’s first priority with the majority of the tax
money front-loaded toward that project. The Town of Yountville completed a Flood Barrier Project in December
2004. This project had a total cost of about $6 million, on track with cost projections, and was funded by a variety of
sources including Measure A, FEMA grants, bond proceeds, Town General Fund monies, and property owner
contributions. The City of St. Helena Comprehensive Flood Project continues in the planning and engineering phase.
$2,040,289.26 in Measure A funds have been spent to date. The City of Calistoga’s Kimball Water Treatment Plant
Maintenance Dredging Project is being conducted using $106,901.41 of the City’s Measure A funds. American
Canyon is implementing a Flood Control and Storm Drain master Plan and has spent $506,671.85 to date of Measure
8
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
In addition to implementing certain Measure A projects, NCFCWCD works with local
jurisdictions with respect to implementing and maintaining local flood control and
stormwater quality improvements. . This work is funded through a District assessment
collected throughout Napa County with the exception of the City of American Canyon.
(Because the City of American Canyon does not collect the District assessment used to
fund these maintenance and improvement projects they do not receive these services from
the NCFCWCD.) Key activities include:
• clearing and maintaining channels;
• clearing problem areas within the Napa River and its tributaries;
• repairing and stabilizing the Napa River and local stream banks;
• installing and operating a countywide early-warning system for flooding;
• replacing and installing major storm drain trunklines;
• managing and monitoring groundwater;
• overseeing adjudicated watersheds;
• preparing special studies for flood protection and water management; and
• developing standardized and integrated flood plain management regulations.
NCFCWCD also administers the Napa County Stormwater Management Program
(NCSWMP) on behalf of each of the five Cities and the County of Napa. Though each of
the five cities carry out their own individual stormwater pollution prevention programs
and hold their own NPDES permit, the NCSWMP provides for the coordination and
consistency of approaches between the individual participants and documents their efforts
in annual reports. The NCSWMP is funded on a pro-rata basis by each participating
agency.
Water Conservation
NCFCWCD’s water conservation services were initiated in 1963 following an agreement
with the State of California’s Department of Water Resources (DWR). The agreement,
which has been amended several times, provides the District with an annual entitlement
of water drawn from the State Water Project (SWP) and enables the District to
subcontract its annual entitlement with local agencies. This feature allows the cost of
SWP water to be passed directly to the local subcontractors. In exchange for an annual
entitlement, the District is responsible for repayment of costs for the construction,
maintenance, and operation of SWP facilities. Notably, along with the Solano County
Water Agency, the District is responsible for the costs associated with the construction
and operation of the North Bay Aqueduct, which facilitates delivery of SWP entitlements
to Napa and Solano Counties. The District currently subcontracts its annual entitlement
A funds. Napa County has expended a portion of its Measure A $976,438.52 funds for the unincorporated area on a
Silverado Trail Flood Protection Feasibility study evaluating elevation of the roadway, and on the Lewelling Avenue
Drainage Outfall Project, which installed a new and larger storm drain reducing flood damage to businesses and
highway users. All amounts are as of June 30, 2005.
9
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
to SWP water to the Cities of American Canyon, Calistoga, Napa, and the Town of
Yountville. A current breakdown of the District’s local subcontracts follows.
NCFCWCD Subcontracts involving the State Water Project
(acre feet)
American
Year Napa Calistoga Yountville Total
Canyon
2007 15,350 4,800 1,625 1,100 22,875
2008 15,600 4,850 1,650 1,100 23,200
2009 15,850 4,900 1,675 1,100 23,525
2010 16,100 4,950 1,700 1,100 23,850
2011 16,350 5,000 1,725 1,100 24,175
2012 16,600 5,050 1,750 1,100 24,500
NCFCWCD also maintains a water supply agreement with the United States Bureau of
Reclamation for an annual entitlement of water drawn from Lake Berryessa as part of the
Solano Project.9 The District subcontracts this entitlement to several individual property
owners in the Lake Berryessa area as well as to three special districts: Lake Berryessa
Resort Improvement District (LBRID), Napa-Berryessa Resort Improvement District
(NBRID), and Spanish Flat Water District. Each subcontractor is responsible for the
construction and operation of their own intake and delivery system to Lake Berryessa.
NCFCWCD Subcontracts for the Solano Project
(acre feet)
Subcontractor Amount
Lake Berryessa Resort Improvement District 200
Napa Berryessa Resort Improvement District 200
Spanish Flat Water District 200
Private Property Owners (five) 173
NCFCWCD’s water conservation services are provided with direction from its
subcontractors. To increase its responsiveness to the collective needs of Napa County,
the District formed an advisory group consisting of the public works directors and staffs
of the five cities and the County. The group, the Water Technical Advisory Committee,
also termed “Water TAC,” provides the District and the local jurisdictions a forum to
discuss current and future water issues.
In addition, to help inform its planning activities, NCFCWCD facilitates collaborative
studies aimed at examining local water supplies and enhancement opportunities. The
District recently facilitated the countywide 2050 Napa Valley Water Resources Study,
commonly referred to as the “2050 Study,” to identify current and projected water
demand within each of its participating agency’s service areas as well as documenting
agricultural demands in unincorporated areas served by groundwater. The District also
participated in a study with the United States Geological Survey to update and review the
9 The Solano Project was developed between 1953 and 1958 and involved the construction of Monticello Dam on Putah
Creek in Napa County for the purpose of forming Lake Berryessa The majority of water drawn from Lake
Berryessa is used by the Solano County Water Agency.
10
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
hydrological and geological properties for the lower basins of the Milliken, Sarco, and
Tulucay Creeks in Napa County. As a result of this study, the District has begun work on
the Milliken-Sarco-Tulucay (MST) Recycled Water Plan. The MST Recycled Water
Plan involves developing design plans, cost estimates, financing mechanisms, and
implementation strategies for importing recycled water from the Napa Sanitation District
to the MST area for landscaping uses in order to help offset demands on local
groundwater supplies.
FINANCIAL
NCFCWD adopts an annual line-item budget that projects anticipated revenues and
expenditures for the upcoming fiscal year. In 2006-2007, the District adopted a total
operating budget of $21,488,213.00. Over the last five fiscal years, the District’s overall
budget has fluctuated between revenues as high as nearly $50 million dollars and as low
as $7.5 million. District expenditures during the same five years have been relatively
stable averaging $31.5 million dollars. The revenue fluctuations are primarily
attributable to the Napa River/Napa Creek Flood Protection Project portion of the budget.
For administrative purposes, NCFCWCD segregates its annual budget into four units. A
summary of these budget units follows.
Flood and Watershed Management
This unit is associated with the District’s annual maintenance of the Napa River
and its tributaries. This unit is primarily funded through tax assessments and
intergovernmental service charges. In 2006-2007, the unit’s adopted budget
projected total revenues and expenses at $962,000 and $1,435,679.11.
Water Supply Contracts
This unit is associated with the District’s contracts with the State of California
and the United States Bureau of Reclamation for annual water supply entitlements
to State Water Project and the Solano Project. The District’s cost for these
contracted water supplies are reimbursed by local subcontractors, which include
cities, special districts, and property owners. In 2006-2007, the unit’s adopted
budget projected both total revenues and expenses at $6,492,027.
Napa River/Napa Creek Flood Protection Project
This unit is associated with the District’s local sponsorship of a comprehensive
flood projection project for the City of Napa. The unit is funded by the Napa
County Flood Protection and Watershed Improvement Authority through a
transfer of sales tax revenues generated by Measure A and also with matching
federal and state funds. Principal expenses include implementing design and
construction costs along with acquiring all necessary lands, easements, right-of-
ways, and relocating existing facilities and structures. In 2006-2007, the unit’s
adopted budget projected total revenues and expenses at $13,934,186 and
$14,009,672.82.
11
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
Measure A - Other
This unit is associated with the District’s contractual responsibility to administer
and disperse funds for qualifying projects under Measure A. In 2006-2007, the
unit’s adopted budget projected both total revenues and expenses at $100,000.
WRITTEN DETERMINATIONS
In anticipation of reviewing and updating NCFCWCD’s sphere of influence, and based
on the above-mentioned information, the following written determinations are intended to
fulfill the requirements of California Government Code §56430. When warranted, some
determinations include supplemental information listed in italics to provide context to the
underlying service factor.
General Statements:
a) Determinations adopted by the Commission as part of the Comprehensive Water
Service Study regarding the Napa County Flood Control and Water Conservation
District remain valid and appropriate.
b) In 1997, voters approved “Measure A,” a countywide sales tax aimed at funding
specific flood protection and water quality enhancement projects in Napa County.
As a sponsor of several authorized projects, including the Napa River/Napa Creek
Flood Protection Project, the Napa County Flood Control and Water Conservation
District has significantly expanded the focus and level of its services as a result of
Measure A.
The Napa River/Napa Creek Flood Protection Project is designed to protect the
City of Napa against all floods up to and including a 100-year storm event.
Infrastructure Needs or Deficiencies:
a) The Napa County Flood Control and Water Conservation District operates and
maintains an infrastructure system of channels, storm drains, and drainage basins
designed to intercept and direct excessive storm and flood waters away from
populated areas in Napa County. The District has established an annual
maintenance program to help ensure this infrastructure system provides an
adequate level of flood control service within its jurisdictional boundary.
b) The Napa County Flood Control and Water Conservation District has experienced
a measurable increase in staff resources and infrastructure holdings over the last
several years. These changes reflect the expanded role of the District in fulfilling
its legislative directive to provide enhanced flood control and water conservation
services in Napa County.
12
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
c) An important challenge for the Napa County Flood Control and Water
Conservation District will be to transition and expand its service and funding
capacities to operate and maintain infrastructure and facilities constructed as part
of Measure A.
d) On behalf of local agencies, the Napa County Flood Control and Water
Conservation District administers water supply contracts for annual entitlements
to the State Water Project and the Solano Project. These administrative services
facilitate the delivery of needed imported water supplies underlying the ability of
local agencies to meet present and future water demands within their respective
service areas.
Growth and Population Projections:
a) The projections prepared by the Association of Bay Area Governments are
satisfactory estimates of the current and future service population of the Napa
County Flood Control and Water Conservation District.
b) All 133,700 people currently estimated by the Association of Bay Area
Governments to reside in Napa County benefit from the services provided by the
Napa County Flood Control and Water Conservation District.
c) The Association of Bay Area Governments projects an annual population growth
rate for Napa County at 0.6 percent over the next 20 years. Although limited, this
projected growth rate will contribute to the intensification of land uses and result
in the continued demand and need for adequate flood control and water
conservation services in Napa County.
d) Approximately 10 percent of Napa County Flood Control and Water Conservation
District’s jurisdictional boundary is located within a flood zone designated by the
Federal Emergency Management Agency. A significant portion of these zones
are located in or near existing urban areas within the Napa Valley, heightening the
need for effective and timely flood control services.
Financing Constraints and Opportunities:
a) The Napa County Flood Control and Water Conservation District serves as an
important instrument in securing federal and state funding that would otherwise
not be available for flood control and water conservation services in Napa
County.
b) The Napa County Flood Control and Water Conservation District is primarily
funded by federal and state appropriations and local sales tax proceeds associated
with Measure A. These funding sources fluctuate annually and create an external
constraint on the District with respect to financing and implementing capital
improvements in a timely manner.
13
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
c) The Napa County Flood Control and Water Conservation District is empowered
under its legislative act to establish zones for assessment purposes within its
jurisdictional boundary. This feature allows the District to provide elevated and
focused flood control and water conservation services to a particular area in a
manner that is directly funded by benefiting property owners.
Cost Avoidance Opportunities:
a) The Napa County Flood Control and Water Conservation District benefits from
cost-savings associated with its relationship with the County of Napa. Savings
drawn from this relationship include providing the District with administrative
and operational staff support at a controlled and below market cost.
b) In 2002, the State of California enacted legislation to measurably increase its
reimbursement to local agencies to help offset their costs in implementing flood
protection projects. This legislation represents a new cost avoidance opportunity
for the Napa County Flood Control and Water Conservation District to develop
and construct flood control projects within its jurisdictional boundary.
Opportunities for Rate Restructuring:
a) The Napa County Flood Control and Water Conservation District does not have
an adopted rate schedule.
Opportunities for Shared Resources:
a) The Napa County Flood Control and Water Conservation District has established
effective partnerships with other agencies to fund various flood control and water
conservation activities within its jurisdictional boundary. These partnerships
enhance and expand the District’s service activities and produce mutually
beneficial projects throughout Napa County.
Government Structure Options:
a) In 1996, the Napa County Flood Control and Water Conservation District’s
governing board was restructured to include elected representatives from all five
incorporated cities in Napa County. This restructuring has helped make the
District more responsive to the collective needs of its jurisdictional boundary.
b) The Napa County Flood Control and Water Conservation District has been
successful in achieving its original service objective to enhance local water
supplies and to provide an elevated level of flood control in Napa County.
14
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
Evaluation of Management Efficiencies:
a) Services provided by Napa County Flood Control and Water Conservation
District are guided by annual work plans that identify goals and objectives for the
upcoming year. These work plans serve as effective performance measures and
encourage management efficiencies by prioritizing District resources in a
transparent manner.
b) The Napa County Flood Control and Water Conservation District provides a
summary of past and projected revenues and expenditures as part of its annual
budget. The budget is adopted following a publicly noticed board meeting in
which members of the public are allowed to comment and offer suggestions with
respect to District expenditures. This budget process establishes efficiencies by
providing a clear directive towards staff with respect to prioritizing District
resources.
c) Expenditures of the Napa County Flood Control and Water Conservation District
involving Measure A funds are subject to the approval of the Napa County Flood
Protection and Watershed Improvement Authority and a Fiscal Oversight
Committee. These arrangements provide additional safeguards regarding the
District’s management and allocation of Measure A funds.
Local Accountability and Governance:
a) The Napa County Flood Control and Water Conservation District is governed by
11 board members representing the five cities and County of Napa. As elected
officials, District board members are accountable to the voters that reside within
their appointing jurisdictions.
b) Meetings of the Napa County Flood Control and Water Conservation District are
conducted twice a month and are open to the public. These meetings provide an
opportunity for District constituents to ask questions of their appointed elected
representatives and help to ensure that service information is being effectively
communicated to the public.
c) It is important that the Napa County Flood Control and Water Conservation
District make a concerted effort to distinguish its service and governance
responsibilities apart from the Napa County Flood Protection and Watershed
Improvement Authority.
d) The NCFCWCD should consider formalizing the Water TAC as a formal
advisory body to the NCFCWCD to more directly facilitate responsiveness to
each local jurisdiction.
15
Napa County Flood Control and Water Conservation District – Municipal Service Review LAFCO of Napa County
SOURCES
Agency Contacts:
Napa County Flood Control and Water Conservation District
Robert Peterson, District Engineer
Felix Riesenberg, Principal Water Resources Engineer
Greg Morgan, Supervising Office Assistant
Documents/Materials:
Association of Bay Area Governments, “Projections 2007.”
County of Napa approved budget reports, FY 2002/3 though 2006/7.
LAFCO of Napa County, file. “Comprehensive Water Service Study,” October,
2004.
LAFCOM of Napa County, file. “Napa County Flood Control & Water
Conservation District 1984 Baseline Report Sphere of Influence Establishment,”
November 1984.
Napa County Board of Supervisors Board Agenda Letter, December 14 2004.
“Water Resources Work Plan.”
Napa County Flood Control and Water Conservation District, Maintenance and
Watershed Programs Project No. 96-1. Project report for FY 2006-7.
Napa County Flood Control and Water Conservation District website,
http://napacounty/fileframe.asp?exturl=http://flood.
Napa County Flood Protection and Watershed Improvement Authority, Ordinance
No. 1. November, 1997.
Napa County Joint Powers Agreement No. 4102.
West’s Annotated California Codes, Water Code Appendix. Chapter 61. Napa
County Flood Control and Water Conservation District Act.
16