LAFCO
MSR and Sphere of Influence Update
Read the report at Local Agency Formation Commissions ↗
Municipal Service Review & Sphere of Influence Update
Study: County Sanitation Services
In Association with the “Proposed “San Diego County Sanitation
District Reorganization” [Ref. Nos: MSR10-04; SR10-04)a-e); SA10-
04(a-e)]
____________________________________________________
Report of the
San Diego Local Agency Formation Commission
Adopted: June 11, 2007
Affirmed: August 6, 2007
Updated/
Amended: September 13, 2010
San Diego Local Agency Formation Commission
1600 Pacific Highway, Room 452
San Diego, CA 92101
619/ 531-5400
Website: www.sdlafco.org
TABLE OF CONTENTS
Page
BACKGROUND
Municipal Service Review ......................................................................................................................... 6
Process ....................................................................................................................................................... 7
Sphere of Influence Requirements ............................................................................................................. 7
Procedures ................................................................................................................................................. 8
Section I: Data Summary
County Sanitation District Enabling Law ................................................................................................ 12
Maintenance District Enabling Act ......................................................................................................... 13
County Sanitation Districts Background ................................................................................................. 13
Uniform Sewer Ordinance ..................................................... …………………………………………..15
Fee Ordinances ........................................................................................................................................ 15
Code of Regulatory Ordinances ............................................................................................................... 15
Board of Supervisors Policies .................................................................................................................. 16
County of San Diego General Plan Update Status .................................................................................. 16
Jurisdictional Changes ............................................................................................................................. 17
Section II: Data Analysis
1. Area and Agency Descriptions
Spring Valley Sanitation District ................................................................................................... 18
Lakeside Sanitation District ........................................................................................................... 23
Alpine Sanitation District... .......................................................................................................... ..28
Julian Sanitation District ................................................................................................................ 32
Pine Valley Sanitation District ...................................................................................................... 35
Other County Wastewater Management Operations ...................................................................... 37
2.Planning for Infrastructure, Facilities and Services .............................................................................. 42
3.Spheres of Influence Analysis and Recommendations ......................................................................... 54
4.Administration, Management and Operations ...................................................................................... 72
5.Fiscal Review ....................................................................................................................................... 75
6.Governance ........................................................................................................................................... 83
2
Section III: Municipal Service Review Determinations
Determination 1: Growth and Population Projections for the Area ....................................................... ..89
Determination 2: Present and Planned Capacity of Public Facilities and Adequacy of Public Services
including Infrastructure Needs .......................................................................................................... ..91
Determination 3: Financal Ability of Agencies to Provide Services ................................................. …..93
Determination 4: Status and Opportunity for Shared Facilities . …………………………………………95
Determination 5: Accountability for Community Service Needs, including Governmental Structural and
Operational Efficiencies .............................................................................................................. ..97
Determination 6: Any Other Matter Related to Effective or Efficient Service Delivery, as Required by
Commission Policy ......................................................................................................................... …98
APPENDIX
A.Statements of Determinations for Spheres of Influence For: San Diego County Sanitation District
(Formally Spring Valley Sanitation District(Lakeside, Alpine, Julian, Pine Valley) ...................... 100
LIST OF EXHIBITS
A. Proposed San Diego County Sanitation District
B. Proposed San Diego County Sanitation District Sphere of Influence
C. Location of County Sanitation Districts and Maintenance District
3
LIST OF FIGURES
1. Spring Valley Sanitation District
2. Spring Valley SD - Facilities and Watersheds
3. Spring Valley SD – Community Planning Areas
4A. Spring Valley Community Planning Area – GP Update-Referral Map
4B. Sweetwater Community Planning Area – GP Update-Referral Map
4C. Valle de Oro Community Planning Area – GP Update-Referral Map
5. Lakeside Sanitation District
6. Lakeside SD – Facilities and Watersheds
7. Lakeside SD – Community Planning Area
8. Lakeside SD – GP Update-Referral Map
9. Alpine Sanitation District
10 Alpine SD – Facilities and Watersheds
11. Alpine SD – Community Planning Area
12. Alpine SD – GP Update-Referral Map
13. Julian Sanitation District
14. Julian SD – Facilities and Watersheds
15. Julian SD – Community Planning Area
16. Julian SD – GP Update-Referral Map
17. Pine Valley Sanitation District
18. Pine Valley SD – Facilities and Watersheds
19. Pine Valley SD – Community Planning Area
20. Pine Valley SD – GP Update-Referral Map
21. Winter Gardens Sewer Maintenance District
22. Winter Gardens Sewer Maintenance District-Facilities and Watersheds
23. Winter Gardens Sewer Maintenance District-Community Planning Area
24. Winter Gardens Sewer Maintenance District GP Update-Referral Map
25. East Otay Mesa Sewer Maintenance District
26. East Otay Mesa Sewer Maintenance District- Watersheds
27. East Otay Mesa Sewer Maintenance District Community Planning Area
28. East Otay Mesa Sewer Maintenance District- GP Update-Referral Map
29. Campo Water and Sewer Maintenance District
30. Campo Water and Sewer Maintenance District- Facilities and Watersheds
31. Campo Water and Sewer Maintenance District Community Planning Area
32. Campo Water and Sewer Maintenance District- GP Update-Referral Map
33. Harmony Grove Sewer Maintenance District
34. Harmony Grove Sewer Maintenance District- Watersheds
35. Harmony Grove Sewer Maintenance District Community Planning Area
36. Harmony Grove Sewer Maintenance District- GP Update-Referral Map
37 Sphere Amendment Activity for Sanitation Districts 1985 – 2010
38. Annexation Inquires on Sanitation Districts
39. Spring Valley SD – Septic System Permit Activity
40. Spring Valley SD (Renamed as San Diego County SD)– Recommended Sphere of Influence
Boundary
41. Lakeside SD – Septic System Permit Activity
42. Lakeside SD – Recommended Zero Sphere of Influence
43. Alpine SD – Septic SystemPermit Activity
44. Alpine SD – Recommended Zero Sphere of Influence
45. Julian SD – Recommended Sphere of Influence
46. Pine Valley SD – Septic System Permit Activity
47. Pine Valley SD – Recommended Zero Sphere of Influence
4
LIST OF TABLES
1. Spring Valley SD – Existing and Future Population
2. Spring Valley SD – Existing and Projected Wastewater Flows
3. Spring Valley SD – Recommended Capital Improvements Program
4. Lakeside SD – Existing and Future Population
5. Lakeside SD – Existing and Projected Wastewater Flows
6. Lakeside SD – Recommended Capital Improvements Program
7. Alpine SD – Existing and Future Population
8. Alpine SD – Existing and Projected Wastewater Flows
9. Alpine SD – Recommended Capital Improvements Program
10. Sanitation District – Staff Organization
11. Spring Valley SD – Revenues and Reserves
12. Lakeside SD – Revenues and Reserves
13. Alpine SD – Revenues and Reserves
14. Julian SD – Revenues and Reserves
15. Pine Valley SD – Revenues and Reserves
5
BACKGROUND
Municipal Service Review
The Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000 requires that
comprehensive studies, known as Municipal Service Reviews (MSR), be conducted for all cities
and special districts that provide municipal services to county residents. The term "municipal
services" generally refers to the service or services that a public agency provides or is authorized
to provide. Typical examples include police, fire, sanitation, water supply and sewage disposal
services. The primary goal of the MSR is to gather and evaluate information in order to make the
following determinations that are required by statute. San Diego LAFCO has developed
guidelines for conducting Municipal Service Reviews (Appendix A) and Factors of Analysis
(Appendix B) for completing the six required MSR determinations summarized below:
1. Growth and population projections for the affected area
2. Present and planned capacity of public facilities and adequacy of public services,
including infrastructure needs or deficiencies
3. Financial ability of agencies to provide service
4. Status of, and opportunities for, shared facilities
5. Accountability for community service needs, including governmental structural and
operational efficiencies
6. Any other matter related to effective or efficient service delivery, as required by
commission policy
Municipal service reviews are to be conducted before, or in conjunction with updating spheres
of influence. A sphere of influence is defined as a plan for the probable physical boundaries and
service area of a local agency, and is determined by LAFCO. Characterized as a planning tool, a
sphere provides guidance in reviewing individual proposals promotes efficient service provision
and prevents duplication of service responsibilities. As a tool for long-range planning, a sphere
may be used as one factor in forecasting an agency's future service needs within a geographic
area in order to anticipate infrastructure planning and financing.
San Diego LAFCO originally initiated its municipal service review program in 2002 after
adopting service review guidelines. The guidelines provide the procedures to fulfill the
municipal service review program. In addition to identifying goals and objectives, the
Commission's guidelines provide direction in determining geographical boundaries, preparing
the report and defining which services and agencies to address. In April 2003, the Commission
adopted an implementation policy recommended by the Municipal Services Working Group and
the Special Districts Advisory Committee for preparing service reviews. Known as the Strategy
for Conducting and Using Municipal Service Reviews, this policy establishes a framework to
assist the Commission in MSR preparation (Appendix C). This MSR specifically addresses
dependent County Sanitation Districts under jurisdiction of the San Diego County Board of
Supervisors.
6
Process
The first task was to determine the geographic area in which to conduct a study that would
include the County sanitation districts. County sanitation district’s operations are primarily
located in the east county area. These districts are: Spring Valley Sanitation District, Lakeside
Sanitation District, Alpine Sanitation District, Julian Sanitation District and Pine Valley
Sanitation District. A map of each district and watershed setting is included for review in
Section II. For the purpose of environmental resource management, watersheds in California
have been divided into discrete sub-areas or hydrologic units that are geographically and
topographically related. Watersheds are also referred to as drainage basins. Drainage courses are
an important consideration in the engineering and design aspects for sewer service systems.
The second task was to identify other agencies that provide similar sanitation services to the
eastern unincorporated area, and determine whether they should be included in this analysis or
be subjected to further MSR review at a later date. For example, the Padre Dam Municipal
Water District and Otay Water District provide wastewater collection and treatment services in
portions of the study area. In addition, the adjoining cities of National City, Chula Vista, Lemon
Grove, La Mesa and El Cajon also provide wastewater services. As with the original MSR
review conducted in 2007, It has been determined and recommended that these independent
agencies not be included as part of this MSR. Staff review finds there are no significant County
sanitation district overlap issues which affect, or will likely affect, these other agencies.
With both the geographic region and services identified, a Request for Information (RFI) was
developed. Questions asked of each sanitation district were specific to those services reportedly
provided to LAFCO in previous investigations.
Sphere of Influence Requirements
In conjunction with the requirement to conduct Municipal Service Reviews, the Cortese-Knox-
Hertzberg Act obligates LAFCO to review and update, as necessary, spheres of influence for
each local agency within LAFCO's jurisdiction. Defined as a plan for the probable physical
boundaries and service area of a local government agency, a sphere is considered to be a
planning tool that is designed to provide guidance in reviewing proposals, promoting the
efficient provision of municipal services, and preventing duplication of service responsibility. In
determining a sphere, the Commission is required to consider specific factors and make written
determinations related to: (1) present and planned land uses in the area, including agricultural
and open space lands; (2) present and probable need for public facilities and services in the area;
(3) present capacity of public facilities and adequacy of public services that the agency provides
or is authorized to provide; and (4) existence of any social and economic communities of interest
in the area. These written determinations are contained in (Appendix D).
7
Procedures
LAFCO staff, with assistance from its consultant and the Department of Public Works,
followed a three-step approach for this MSR. The first step involved compiling, reviewing, and
analyzing the requested data and drafting the initial report. There are two elements of the draft
report. Section I is the Data Summary - an extract of information submitted by the affected
agencies - which is divided into five distinct segments (one for each responding sanitation
district).
When the initial step was completed, the draft report was distributed for review to provide
agencies, organizations, and individuals the opportunity to comment on the contents, and make
appropriate corrections, if necessary.
The last step involved finalizing the report by including additional information and updating
specific facts, formulating the required nine determinations, and presenting the document for
Commission deliberation. The goal of the review process is to assess the adequacy of public
services in a specific geographic region or area rather than scrutinizing the agencies themselves.
However, since municipal services are delivered by public agencies, the review of those entities
is unavoidable.
8
SECTION I: DATA SUMMARY
SAN DIEGO COUNTY SANITATION DISTRICT
2010 Amendment (Proposed “San Diego County Sanitation Services Reorganization”)
One of the determinations contained in the MSR/SOI adopted by the San Diego LAFCO was for
the County to explore the consolidation (reorganization) of county sanitation services. Several
years after adoption of this determination by the San Diego LAFCO, the County of San Diego
initiated a study to evaluate the benefits and liabilities of creating a single sanitation district
which would provide sewer services to the five existing sanitation districts (Alpine Sanitation
District, Julian Sanitation District, Lakeside Sanitation District, Pine Valley Sanitation District
and Spring Valley Sanitation District) and four existing sewer maintenance districts (Campo
Water and Sewer Maintenance District, East Otay Sewer Maintenance District, Harmony Grove
Sewer Maintenance District and Winter Gardens Sewer Maintenance District).
In recognition of the many potential benefits of having a single district, the Board of Supervisors,
acting as the Board of Directors of the Spring Valley Sanitation District, approved a resolution of
application to LAFCO in February 2010 for a reorganization which proposes the formation of the
“San Diego County Sanitation District”. The district would be a consolidated dependent special
district governed by the Board of Supervisors. Concurrent with the approval of this resolution
were supporting resolutions from the other sanitation districts included in the proposed
reorganization.
If approved, the reorganization would:
• Dissolve the Alpine Sanitation District;
• Dissolve the Julian Sanitation District;
• Dissolve the Lakeside Sanitation District;
• Dissolve the Pine Valley Sanitation District;
• Annex the territory within the Alpine Sanitation District, Lakeside Sanitation District,
Pine Valley Sanitation District, Julian Sanitation District, and the East Otay Mesa Sewer
Maintenance District; Campo Water and Sewer Maintenance District, Harmony Grove
Maintenance District and Winter Gardens Sewer Maintenance District to the Spring
Valley Sanitation District; and
• Re-name the Spring Valley Sanitation District as the “San Diego County Sanitation
District”.
Exhibit A illustrates the proposed boundaries for the “San Diego County Sanitation District”,
which would consist of approximately 46.6 square miles.
9
In March 2010, an application for the proposed “San Diego County Sanitation Services
Reorganization” was filed with LAFCO as well as this update to the adopted MSR/SOI Study.
As depicted by Exhibit B, the proposed sphere of influence for the “San Diego County Sanitation
District” would consist of the existing spheres of influence of the five sanitation districts and the
current service areas of the four maintenance districts. Zero spheres of influence would be
adopted for the four existing sanitation districts concurrent with their dissolution. The newly
established sphere of influence for the proposed “San Diego County Sanitation District” would
include approximately 58.3 square miles.
Background
Five County Sanitation Districts and four Maintenance Districts administered by the County of
San Diego serve approximately 120,000 residents in a number of diverse and geographically
separated communities. The districts differ significantly as each responds to historical
circumstances, legal requirements, availability of financial resources, the extent of
existing/projected growth and the condition of conveyance and treatment facilities. In many
ways, the distinctions between the districts are evidence of the many aspects of a county that
spans 4,526 square miles and has approximately 3 million residents (fifth most populous in the
nation). Approximately three-quarters of the unincorporated population are served by private
disposal systems rather than County Sanitation or Maintenance Districts, reflecting the rural
nature of significant portions of the county. The vast majority of those currently receiving public
service are concentrated in two of the more urbanized districts (Spring Valley Sanitation District
and Lakeside Sanitation District).
Exhibit C depicts the location of the nine districts within the County of San Diego. Collectively,
their conveyance systems includes approximately 450 miles of pipeline and 8 pump stations.
Depending on the community, wastewater treatment is provided by either the City of San Diego
Metropolitan Wastewater system (“Metro”) or one of several locally-based plants operated by
the respective county districts.
All nine county districts are separate entities but the County Department of Public Works
provides management, administrative, operational and various support personnel. The current
management to staff ratio is below the industry standard. Each district has a separate budget,
sewerage infrastructure, operational permits and environmental compliance criteria.
Sewer service is provided to unincorporated residents through two distinct types of entities:
County Sanitation Districts: Formed pursuant to Health and Safety Code (Sections 4700-4858),
County Sanitation Districts provide service to over 120,000 residents. The number of County
Sanitation Districts has declined in the last several decades largely because of incorporation or
consolidation with other agencies. The County Board of Supervisors acts as the governing board
for five county sanitation districts. Three of the districts (Alpine, Lakeside and Spring Valley)
utilize the City of San Diego’s Metro Wastewater system for treatment. The smaller Pine Valley
and Julian County Sanitation Districts have their own dedicated community-based treatment
10
facilities. Changes to County Sanitation District boundaries, as well as formation, dissolutions
and consolidations are subject to oversight of the Local Agency Formation Commission
(LAFCO). All other operational decisions regarding the activities of a County Sanitation District
are administered by the Board of Directors of each district rather than the LAFCO Commission.
Maintenance Districts: Maintenance Districts are authorized by the Streets and Highway Code
(Chapter 26, Sections 5820-5856) to provide a variety of public facilities including sewer
service. Pursuant to State Law, maintenance districts are not considered “special districts”.
Therefore, maintenance districts are exempt from LAFCO review. The Board of Supervisors is
directly responsible for the Winter Gardens, East Otay Mesa, and Harmony Grove Sewer
Maintenance Districts, as well as the Campo Water and Sewer Maintenance District.
While county sanitation districts and sewer maintenance districts have slight differences in
formation criteria, each of the entities differ considerably from one another in many respects.
Age-While several of the county sanitation districts were organized in the 1940’s and 1950’s
(Julian, Alpine, and Lakeside), the Board of Supervisors within the last ten years has formed
maintenance districts to serve East Otay Mesa, Campo and Harmony Grove Village.
Geographic Size-The existing boundaries of the districts range from 28 acres (Pine Valley) to
over 20 square miles (Spring Valley Sanitation District).
Services-Although both county sanitation and maintenance districts are potentially empowered to
offer multiple public services, only Campo offers both water and sewer service.
Population/Customer Base-The districts vary greatly from largely undeveloped (Harmony Grove
Village and East Otay Mesa), sparsely populated (Pine Valley and Julian) and highly urbanized
(Spring Valley and Lakeside). The estimate of service populations ranges from 120 residents in
Pine Valley to 85,000 people who live within the Spring Valley Sanitation District.
Land/Use Growth-The County’s proposed General Plan Update, which provides a blueprint for
future growth, offers very different visions for the individual communities that are served by
either county sanitation or sewer maintenance districts. The future sewer service needs of East
Otay Mesa, which is slated for industrial and commercial uses is far different from rural/semi-
rural areas where the extension of public sewers is constrained by the adopted policies of the
Board of Supervisors. A continuing challenge for San Diego County is to coordinate decisions
concerning the intensity, timing and location of growth with public facility planning, financing
and implementation.
Facilities-The more urban districts have complex sewer conveyance systems that rely on
cooperative agreements with other agencies. Five of the sanitation/sewer maintenance districts
receive treatment from the City of San Diego’s Metro system. Collectively, these districts have
rights to 6.9 % of total Metro capacity. Three districts (Pine Valley, Julian and Campo) currently
have their own wastewater treatment plants with one planned for the future residents of Harmony
11
Grove Village. The condition of each district’s major facilities varies depending on age, use and
past maintenance. While several of the districts have on-going implementation of Capital
Improvement Programs, others address system deficiencies on an as-needed basis. The County
Department of Public Works, which is in the early stages of updating master plans for each of the
districts, will eventually use these documents to better understand: 1) growth implications of the
General Plan Update, 2) conditions of existing infrastructure, 3) short and long term facility
needs of the districts and 4) the resources necessary to maintain, improve and/or expand the
system.
Financial Conditions-Each sanitation district has a fee structure that is adopted by separate
ordinance. Annual residential sewer rates range from $216 (Winter Gardens) to $705 (Julian).
Rates are typically higher for the smaller rural districts than the more densely urbanized districts.
Spring Valley Sanitation District, the largest of the urban districts, currently has an annual
residential rate of $336. Rural districts such as Pine Valley ($636) and Julian ($705) have a
limited customer base and higher operating costs associated with operation of on-site treatment
plants. Metro districts are vulnerable to rate increases due to share contributions required by the
City of San Diego for capital and operation and maintenance expenses incurred by the larger
Metro system. Despite lower annual rates, two of the urban districts (Spring Valley and
Lakeside) have been able to accumulate significant reserves, while several of the smaller districts
have limited or non-existent reserves. Meeting operating costs, setting rates and modernizing
conveyance and treatment systems within the smaller districts is and will continue to be
problematic for the County, if the districts are not part of a larger agency.
GENERAL INFORMATION
County Sanitation District Enabling Law
The enabling law for county sanitation districts is located within Sections 4700-4859 of the
Health and Safety Code. The proposed “San Diego County Sanitation District” would operate as
a County Sanitation District. According to these code sections, the governing body of a
sanitation district is composed of a board of directors of not less than three members. The
makeup of the board may consist of the Board of Supervisors, the legislative body of a city, or
other public agency, depending on land area and jurisdictional criteria.
In addition to providing sewage collection, treatment, and disposal, State Law enables county
sanitation districts to provide additional services subject to LAFCO approval. These services
include, refuse transfer or disposal, street cleaning, water service, etc. After the district has been
formed, boundaries may be altered and the following territory may be annexed to the districts:
Any territory not in any other sanitation district or district formed for similar purposes;
Contiguous or noncontiguous territory;
Unincorporated and/or incorporated territory.
12
Maintenance District Enabling Act
Maintenance Districts are subject to the Streets & Highway Code (Chapter 26, Sections 5820-
5856). Maintenance Districtricts are considered a financing mechanism available to the Board of
Supervisors, rather than a local agency. The Board of Supervisors is responsible for formation,
boundary changes and dissolution without LAFCO oversight. As part of the reorganization, the
proposed “San Diego County Sanitation District would assume the responsibilities of the four
maintenance districts. Three of the four sewer maintenance districts would be dissolved by the
Board of Supervisors, consistent with the Health & Safety Code. The Campo Water and Sewer
Maintenance District would continue to exist, but it would only provide water service.
California laws (Chapter 26, Section 5847.5) allows maintenance districts to operate within the
boundaries of a sanitation district provided consent is obtained from the Board of Supervisors.
County Sanitation Districts Background
The five county sanitation districts covered by this MSR and Sphere of Influence Update Study
were formed between 1945 and 1969 to provide wastewater service to various unincorporated
areas of San Diego County. These districts are the Spring Valley, Lakeside, Alpine, Julian and
Pine Valley sanitation districts. Ideally, decisions about public infrastructure, i.e., roads, water
and sewer service should be made in concert with goals of the general plan to achieve
consistency concerning the density, timing, and location of growth, and the ability to finance
necessary public facilities.
The current general plan for the unincorporated portion of the County served by the five county
sanitation districts has not been comprehensively updated since 1979 and has been the subject of
substantial piecemeal modifications since that time. During this time period, considerable growth
and change has taken place, leading to the incorporation of a number of cities and annexation of
lands in unincorporated peripheral areas. The County is nearing completion on a new General
Plan Update.
Today, the unincorporated area of the County comprises of 84 percent of the total land area of
San Diego County and is estimated to contain 16 percent of the entire County population of
approximately 2.8 million people. Federal, state and other public lands make-up a significant
percentage of the total unincorporated area, and are generally unavailable for development.
However, the supply of vacant land available for development appears to be sufficient to
accommodate the projected year 2030 population.
According to the San Diego Association of Governments (SANDAG), the population of the
entire County is estimated to grow to3.9 million by the year 2030. The existing population of the
unincorporated area 504,719) is projected to grow by 218, 673 to approximately 723,392 people
in the same period. The County’s General Plan Update is intended to form a framework for
guiding growth in the unincorporated area. The end result is intended to be a planning document
that protects the environment, accommodates population growth, and links growth to the
provision of required facilities and services.
13
In San Diego County, there are seven county sanitation districts. Two of the districts are
primarily located within Cities (Vista and Lemon Grove); therefore the governing boards for
those districts are the respective city councils. The County Sanitation District MSR and Sphere
Update Study will address the remaining five county sanitation districts that serve
unincorporated territory. These districts are located in the eastern unincorporated county area, an
area that is expected to experience continued growth through the year 2030. The proposed
amendment to the sphere will consider the proposed “San Diego County Sanitation District.”
These districts are governed by the San Diego County Board of Supervisors and serve the
unincorporated communities of Spring Valley, Lakeside, Alpine, Julian, and Pine Valley. In
addition, there are other County wastewater operations not currently subject to LAFCO review.
These operations will be summarized in Section II (including information about the four sewer
maintenance districts that are proposed to become part of the proposed “San Diego County
Sanitation District”).
The number of county sanitation districts has declined during the past 25 years. During this
period San Diego LAFCO dissolved the Cardiff, Solana Beach, Santee, Mt. Woodson Ranch,
Rancho Santa Fe, Fairbanks Ranch, Whispering Palms, Rancho Cielo, and 4S Ranch County
Sanitation Districts. In 1988, Board of Supervisor jurisdiction over the Lemon Grove County
Sanitation District was transferred to the Lemon Grove City Council. The City of Vista assumed
administrative duties for Buena Sanitation District in 1993. After formation of the Mt. Woodson
Ranch Sanitation District in November, 1988, no further sanitation districts have been
established in San Diego County.
The Wastewater Management Section of the County Public Works Department (DPW) is
responsible for operations and overall administration of the five County sanitation district
wastewater systems. Sewage generated within the Julian and Pine Valley sanitation districts is
treated locally, while sewage in the Lakeside, Alpine, and Spring Valley districts is conveyed
through the City of San Diego's Metropolitan Sewerage System (Metro) by inter-jurisdictional
agreement. Two of the four sewer maintenance districts (East Otay Mesa and Winter Gardens)
also rely on Metro for treatment.
The Metro system is owned by the City of San Diego and consists of all elements required for
the collection, conveyance and treatment of wastewater generated within its service area. The
Metro service area consists of the City of San Diego, plus 15 other cities and districts located
within a 450 square mile area. The served population is estimated at more than 2 million. The
Metro system treats approximately 180 million gallons per day (mgd) of wastewater at its Point
Loma treatment facility. The facility has a rated capacity of approximately 240 mgd. Treated
effluent is discharged into the Pacific Ocean through a 4.5 mile underwater outfall system. Each
county sanitation district served by Metro pays sewage transportation and treatment/disposal
charges to the City of San Diego based on the “strength” characteristics of the sewage. The
higher strength users (e.g., food establishments) pay a higher per unit charge than a lower
strength user (e.g., single family home, apartment).
14
Three of the County sanitation districts (Spring Valley, Lakeside and Alpine) and two
maintenance districts (East Otay Mesa and Winter Gardens) are Participating Agencies in the
Metro system and remain individually responsible for fair share costs of Metro capital, operating
and maintenance costs. These costs are normally referred to as “Metro fees”. These agencies
also participate on the Metro Commission, which is an advisory body to the San Diego City
Council. This provides an opportunity to review and comment on Metro programs and costs that
affect individual agency operations. The Commission meets monthly.
The proposed “San Diego County Sanitation District” would continue as a Participating Agency
in the Metro system.
Uniform Sewer Ordinance
The County sanitation districts and sewer maintenance districts operate under the Uniform Sewer
Ordinance (USO). The USO sets forth rules and regulations for operation and maintenance of
the sewage collection and treatment systems. Classes of sewer service are categorized by land
use type. Provisions for annexation are addressed, along with procedures for obtaining new or
modified sewer service. Wastewater Discharge Permits are issued to each customer with
approximately 90 percent listed as residential type and 10 percent commercial. Violations are
subject to misdemeanor charges.
The proposed “San Diego County Sanitation District” will continue to implement the
requirements of the Uniform Sewer Ordinance, as a condition of approval of the reorganization.
Fee Ordinances
Each sanitation district has a fee structure that is adopted by separate ordinance. The proposed
“San Diego County Sanitation District” would remove the need for having separate fee structures
for each district. As proposed, the district would have a single annual sewer service charge and
uniform capacity and annexation fees, unless circumstances associated with former districts
require otherwise. The ordinance includes annual sewer service fees, capacity fees (i.e., system
buy-in charge) and annexation fees. Annual sewer service fees are collected on the annual
County tax rolls, which are paid either once or twice per year. Annexation and capacity fees are
collected at the time application is made or when a Wastewater Discharged Permit is issued.
Code of Regulatory Ordinances
Title 6 of the County of San Diego Code of Regulatory Ordinances (Code) specifies conditions
and procedures for connection and use of sewage facilities by sanitation district customers. The
Code incorporates many, but not all, provisions of the USO. It appears that whenever changes to
the USO occur, they may not always be incorporated into the Code in a consistent or timely
15
manner. The proposed “San Diego County Sanitation District” will continue to function in
compliance with the Code of Regulatory Ordinances.
Board of Supervisors Policies
The Board of Supervisors has also adopted several “Board Policies” which are intended to
provide further guidance to county staff, property owners and developers who utilize, or propose
to utilize, sanitation district facilities. These policies address such topics as planning and land
use coordination, sewer capacity and availability, small wastewater treatment facilities, sewer
connections and financing for replacement/expansion of sanitation district systems. A more
complete description of these policies is provided in Section II, Data Analysis. The proposed San
Diego County Sanitation District” will assume all of the relevant “Board Policies” which govern
either sanitation or sewer maintenance districts”.
County of San Diego General Plan Update Status
When the MSR/SOI study was adopted by LAFCO in June 2007, the approval of General Plan
2020 was pending. The on-going study, which has been re-named as the General Plan Update, is
scheduled to be heard by the Board of Supervisors in Fall 2010. The General Plan Update
includes four alternatives for each community planning area:
• Draft Land Use Plan-This map was originally endorsed in August 2006 and modified in
May 2007. It was the basis for the original analysis for growth potential in the 2007
MSR/SOI Study.
• Referral Map-This second alternative, which was also first studied in 2006, includes
requests from the Board of Supervisors to look at other options for designated parcels.
• Hybrid Map-A staff developed land use map which combines elements of the Draft Land
Use Plan and Referral Map.
• Environmentally Superior Plan-In compliance with the California Environmental Quality
Act, the Draft EIR for the General Plan Update includes a less intensive alternative.
Buildout of the currently adopted General Plan would potentially allow for an estimated
maximum population of 767,780 in the unincorporated county. The General Plan Update
proposes an overall population reduction. Depending on the alternative selected, the population
projections countywide range from 641,070 (Environmentally Superior) to 678,270 (Referral
Map). This MSR/SOI update considers the service implications of the various alternative
population projections.
16
Jurisdictional Changes Since June 2007 MSR/SOI Adoption
The San Diego LAFCO has approved a limited number of annexations to county sanitation
districts since the 2007 MSR/SOI adoption. If approved by LAFCO, service for any pending
sanitation district annexation would be provided by the proposed “San Diego County Sanitation
District.”
Alpine Sanitation District
Only one jurisdictional change was approved by LAFCO during June 2007-March 2010. In
March 2009, the 3.9 acre Alpine Regional Center was annexed. The territory was already within
the adopted sphere of influence.
Julian Sanitation District
Both the sphere of influence and jurisdictional boundaries have remained the same since
adoption of the MSR/SOI study.
Pine Valley Sanitation District
The boundaries of the sphere and district service area are also unchanged during the time period
of June 2007-March 2010.
Lakeside Sanitation District
The sphere of influence was amended once in February 2010 in conjunction with the annexation
of the 8.0-acre Oak Creek RV Park. Several other annexations have also been approved within
the sphere including the Erreca Reorganization (22.71 acres) and the Cham Annexation (.59
acres). Two other proposals are currently being reviewed including one with an approved out-of-
service agreement for .50 acres.
The Crestlake Estate Reorganization (303.51 acres) was presented as an informational item to the
LAFCO Commission in November 2008. The proposal is currently being reviewed.
Spring Valley Sanitation District
LAFCO approved eight annexations ranging in size from 0.30 acres to 3.7 acres (including two
sphere amendments totaling less than 1.0 acre).
17
SECTION II: DATA ANALYSIS
1. Area and Agency Descriptions
Spring Valley Sanitation District
The Spring Valley Sanitation District (SVSD) was formed in 1952 and operates and maintains
sewage collection and conveyance facilities for the unincorporated communities of Spring
Valley, Valle de Oro and Sweetwater. These communities are located east of Highway 125, and
north and south of Highway 94. The SVSD is approximately 20 square miles in area, with an
estimated population of 85,000 residents (DPW/SANDAG). The SVSD also adjoins the cities of
San Diego, La Mesa, Lemon Grove, National City and Chula Vista. Other independent districts
providing related services in the area include the Otay Water District (water/sewer), Sweetwater
Authority (water) and the Helix Water District (water).
The SVSD has approved interagency agreements which provide shared use and costs for access
to SVSD facilities. These agreements are with the cities of San Diego, La Mesa, Lemon Grove,
National City, and Chula Vista, and the Otay Water District. The agreements predate current
LAFCO review requirements. SVSD facilities - primarily the Spring Valley Outfall Interceptor -
are utilized by these agencies to convey wastewater to the Metro System. The SVSD has 10.35
million gallons per day (mgd) of Metro capacity rights. Current annual discharge flows through
the SVSD Outfall average about7.2 mgd (includes existing flows plus service commitments).
Therefore, system capacity reserves are available to support future service needs.
As of March 2004, the combined share of daily flow by agencies using the SVSD Outfall totals
over 50,000 Equivalent Dwelling Units (EDU). An EDU is the standard measurement system
used to establish equivalency for municipal and industrial sewage flows. It equates to the
average amount of sewage discharged from a single family dwelling each day (sanitation
districts use 240 gallons/day/dwelling unit for project planning and design purposes).
The total daily flow includes discharges from the SVSD (32,000 EDUs), Chula Vista (12,000
EDUs), Lemon Grove (1,500 EDUs), La Mesa (2,700 EDUs), Otay Water District (2,500
EDUs), and the City of San Diego (7,400 EDUs).
In addition to the Outfall, SVSD also operates and maintains 278 miles of sewer collection and
transmission facilities, four pump stations and thirteen flow meter stations. The SVSD Outfall
connects to Metro near Interstate 5 where flows are measured by a City of San Diego meter
station. The outfall is a regional facility and was designed to serve the lower and middle
Sweetwater River drainage basins irrespective of local jurisdictional boundaries. SVSD
18
operations are considered adequate to meet current system demands. Facility plans and future
system improvements are reviewed further in Section II, (2), Planning for Infrastructure,
Facilities and Services.
As part of the reorganization, the boundaries of the Spring Valley Sanitation District will be
expanded to include the existing territory of the other sanitation districts and sewer maintenance
districts and re-named as the San Diego County Sanitation District. The combined district will
reflect the existing boundaries of each individual sanitation district and maintenance district.
Additions or deletions of territory which would change service responsibilities are not being
proposed.
District Map and Watershed
Figure 1 shows the location and current boundaries of the SVSD and adjoining cities and
districts. Figure 2 shows the location of major sewer facilities and portions of the lower
Sweetwater River watershed area. As the lowest drainage points in the watershed, creek and
river side routes are frequently used in the design of gravity flow sewer systems for reasons of
economy and safety. This reduces the frequency of sewer spills over that which may occur more
frequently in pressurized systems. The pumping stations which do exist in portions of the system
utilize back up generators and “wet wells” to temporarily contain sewage in the event of system
failure.
Board of Supervisor Policies
The Board of Supervisors has adopted various policies which apply to the planning and
operational activities of the SVSD. Some of these policies also apply to other sanitation districts.
As noted, the newly established district would continue to be subject to currently adopted Board
policies. These Board policies are summarized below:
1. I-36: Sewer Extensions and Connections in Areas Not Annexed to a Sanitation District
Policy I-36 prohibits extension of sewer lines to areas not located within a sanitation
district unless annexation has occurred. Where a public health problem has been
determined, application to LAFCO for annexation must occur. A temporary connection
agreement (subject to LAFCO approval) can then be issued prior to completion of
annexation proceedings.
2. Policy I-48: Sewer Extensions in Areas Not Annexed to a Sanitation District
Policy I-48 requires all sewer extensions within sanitation districts to be accomplished by
private contract rather than by County forces. This is due to limited county staffing and
19
availability of private contractors. The policy will be reviewed for continuance by 12-31-
10.
3. Policy I-51: Connection to Districts Interceptor Sewers
Policy I-51 is intended to prevent connections to sewer interceptors constructed through
undeveloped land which is not planned for urban services. The policy will be reviewed
for continuance by 12-31-12 .
4. Policy I-78: Small Wastewater Treatment Facilities
Policy I-78 allows for construction of small wastewater treatment facilities under certain
conditions. This policy generally applies to certain unincorporated areas where public
sewer facilities are unavailable. Since SVSD is considered part of the Metro System, the
policy is not applied in the SVSD area. However, if in the event such a facility was
proposed, conformance with I-78 would be required. The policy will be reviewed for
continuance by 12-31-10.
5. Policy I-84: Project Facility Availability and Commitment for Public Sewer, Water,
School and Fire Services
Policy I-84, with respect to sewer availability, requires the SVSD to issue sewer
availability letter for prospective discretionary projects as a condition of County
approval. This is to ensure that adequate sewer facilities and capacity will be available at
the time it is needed. The policy will be reviewed for continuance by 12-31-10.
6. I-99: Expenditures and Use of Revenue for Replacement and Expansion of Liquid Waste
Facilities
Policy I-99 defines requirements for establishing district reserves, and funding for
replacement and expansion of sewerage systems and facilities within the County
sanitation districts. This policy will be reviewed for continuance by 12-31-12.
7. Policy I-107: Policy on Long-Term Availability of Sewer Services to Certain Portions of
East County
This policy is designed to regulate connections to the Rancho San Diego Sewer
Interceptor which is jointly shared by SVSD and the Otay Water District. It restricts new
20
connections to areas within the (existing) County General Plan Urban Limit Line and
restricts use by other districts (e.g., Otay Water District) to LAFCO approved service
areas. Exceptions to the policy are provided for sewer service needed to protect health
and safety (e.g., septic failures). This policy will be reviewed for continuance by 12-31-
12.
Six of the above policies have a direct relationship on land use and public facility planning
activity, which the Board of Supervisors has considered to be an important component of the
County General Plan. Those policies are currently under review as part of the General Plan
Update review process to determine if they remain consistent with current land use conditions
and goals and objectives. Recommendations will be presented to the Board as part of the
General Plan Update approval process. Improved coordination is achieved between wastewater
facility planning and land use planning because the Board of Supervisors is the decision making
body for the sanitation districts as well as for the County’s planning program. This relationship
provides better integration between planning and the delivery of services in conformance with
General Plan Update goals.
Sewer Service Charges
In 2004, the Board of Supervisors approved a four percent (4%) sewer service charge increase
for SVSD customers to be collected over a five year period. This was the first approved rate
increase since 1997. Annual rates have been unchanged as of 2008 and remain at $336 per EDU.
The connection capacity (“buy-in”) fee is $2,000 per EDU and the annexation fee is $1,000 per
EDU. These fees have remained unchanged since 1988. As part of the 2004 rate adjustment
process, the annexation fee (for all districts) was changed from an acreage based fee to an EDU
based fee.
The first year (FY2011-12) rate for the proposed “San Diego County Sanitation District” would
be the Spring Valley Sanitation District rate of $336 per EDU. Residential customers are charged
1 EDU for a single family dwelling with multi-family and mobile homes charged a slightly lower
rate (0.8/0.65 EDU’s respectively). Commercial and industrial charges are based on a sewer
model that accounts for the strength and amount of wastewater generated by different types of
user classes. The minimum charge for this user class is 1.2 EDU’s (e.g. Postal Annex).
Residential uses account for over 90 percent of all wastewater flows discharged into the SVSD
system.
The objective of rate review and adjustment is to ensure financial stability to enable continuation
of wastewater collection and disposal operations, avoid potential sewage spills, system outages
and related water quality or public health problems.
21
Community Planning Areas
The SVSD provides sewer service to portions of three County community planning areas (CPA):
Spring Valley (11 sq. mi.), Valle De Oro (19 sq. mi.) and Sweetwater (12 sq. mi.). These areas
are of an urban/suburban nature, and most require access to sewer collection facilities. The
CPA’s are generally larger in area than the actual SVSD boundary. This can result in slightly
different population estimates between CPA’s and the District. Each CPA is represented by an
elected planning group. The Valle De Oro and Spring Valley Planning Groups meet twice per
month; Sweetwater meets once per month. These groups provide advice to the Board of
Supervisors and Planning Commission on land use planning matters. They are frequently
utilized by other agencies (including LAFCO) who seek community input on projects or
proposals which may affect their areas. Figure 3 shows the boundaries of the three CPA’s.
General Plan Update - Community Planning Area Goals
Spring Valley
Spring Valley is planned to grow from its existing population of approximately 62,377 to
a General Plan Update 66,990-67030 depending on the land use alternative.
Sweetwater
The Sweetwater area is planned to grow from its existing population of approximately
13,000 to a General Plan Update projected goal of 15,500.
Valle de Oro
The Valle de Oro is planned to grow from its existing population of approximately
43,000 to a General Plan Update projected goal of 45,100.
Figure 4A, 4B and 4C shows proposed General Plan Update land uses for the SVSD area.
Service Implications for the Spring Valley Sanitation District
As previously noted, the SVSD provides sewer service to portions of these three CPA’s. The
CPA population forecasts include communities that are suburban/semi-rural, and not planned for
sewer service. Therefore, SVSD uses CPA forecast as a guide for planning future capital
projects, but must also supplement that information with additional district level analysis. SVSD
has recently completed a Facility Plan Study to determine future system needs and requirements
to ensure the District will have sufficient facilities available and operational to safely dispose of
future wastewater flows.
22
The Facility Study projects the ultimate capacity required for SVSD planning purposes (beyond
2020) will be approximately 33,500 EDUs or about 3,000 EDUs more than in 2005 (this does not
include EDUs assigned for commercial or industrial purposes). This equates to an increased
population of about 8,000 for an estimated total population of 93,000 by 2020 or beyond.
Approximately 700,000 gallons per day of additional wastewater flow will be generated over the
next 20 – 30 years as a result of this growth. This amount appears to be well within SVSD’s
remaining Metro capacity rights. The Facility Study and SVSD capital improvement plans will
be discussed further in Section II (2), Planning for Infrastructure, Facilities and Services.
Lakeside Sanitation District
The Lakeside Sanitation District was formed in 1955 and operates and maintains the public
sewer system for the unincorporated community of Lakeside. The district would be dissolved as
part of the proposed “San Diego County Sanitation District Reorganization”. Lakeside SD is
located east of Highway 67 and north of Interstate 8, approximately 21 miles east of the City of
San Diego within the Upper San Diego River Basin. Currently, the District consists of 18.0
square miles (11,542 acres) with approximately 13,200 EDU accounts (plus additional
committed capacity purchases). Residential uses are estimated at 10,500 EDUs and 2,700
commercial EDUs. Based on SANDAG’s population estimate of 2.9 persons per household in
the Lakeside CPA, the estimated population of Lakeside SD is about 30,500. The limits of the
District are generally defined by the Upper San Diego River to the north, the Winter Gardens
Sewer Maintenance District and the cities of El Cajon and Santee to the south and west and the
El Monte/Lake Jennings/Dunbar Lane areas to the east.
Originally, the Lakeside SD included a wastewater treatment plant and discharge system. When
constructed in 1959, the treatment plant discharged treated effluent into percolation ponds that
eventually migrated into the San Diego River. Continued growth within the Lakeside area and
nearby Alpine Sanitation District (which also had a small treatment plant) necessitated regular
treatment plant expansions and upgrades.
Eventually, the Regional Water Quality Control Board issued a cease and desist order to the
Lakeside and Alpine districts in order to prevent potential degradation of the San Diego River
and Alpine Creek. Based on a financial assessment of treatment plant upgrade requirements, the
District determined that a more cost effective option would be construction of a new gravity
trunk sewer system to allow conveyance of the combined flows from Alpine and Lakeside into
the City Metro System. As a result, the Alpine-Lakeside Interceptor Sewer System was designed
and constructed.
This system consisted of two components: 1) construction of a sewer interceptor connection
between Alpine and Lakeside (approximately 7 mi.), and 2) construction of the Lakeside
Interceptor from the former treatment plant site, near the intersection of Woodside Avenue and
Riverford Road, to the City of San Diego’s East Mission Gorge Interceptor – a distance of
approximately 3 miles. From the Mission Gorge area, sewage flows several miles further west
23
within the Metro system to the Point Loma Plant for treatment and ocean disposal. The District
has 4.1 mgd of Metro capacity rights. Current annual discharge flows average 2.6 mgd.
The majority of the collection system consists of 8” diameter pipe. The largest collection trunk
sewer is 42” in diameter before it connects to the Metro system. The connection to the Metro
system is 400’ west of the intersection of Fanita Road and Mission Gorge Road. Lakeside,
Alpine SD and the Padre Dam MWD maintain an interconnection agreement and share a
common Metro connection in this area. The Lakeside SD also has two pump stations, the Wood
Creek Pump Station located at 15935 Spring Oak Road and the Morena Avenue Pump Station
located at 10955 Morena Avenue (presently not in use). Overall, the District maintains 94.1
miles of sewer collection and transmission facilities.
The current number of EDUs generated in the Lakeside SD, including other jurisdictions that
maintain connection agreements with Lakeside, is approximately , 13,614. The district also has
253 EDUs reserved for potential customers (e.g., High Meadow Ranch). Infrastructure serving
High Meadows Ranch has been constructed but not accepted by the County. At the time of the
preparation of the MSR/SOI Amendment, the community was undeveloped except for model
home construction. The territory was annexed as part of the Upper San Diego River
Reorganization. Lakeside SD operations are considered adequate to meet current system
demands. Facility plans and future system improvements are reviewed further in Section II (2),
Planning for Infrastructure, Facilities and Services.
District Map and Watershed
Figure 5 shows the location and current boundaries of the Lakeside SD, and adjoining agencies.
Figure 6 shows the location of major sewer facilities and portions of the San Diego River
watershed area. Although the district would be dissolved as part of the proposed reorganization
the service area and facilities are proposed to become part of the San Diego County Sanitation
District.
East Mission Gorge Interceptor
The City of San Diego’s East Mission Gorge Interceptor Sewer (not a part of Metro) is used by
Alpine, Lakeside, Winter Gardens, El Cajon and the Padre Dam MWD to convey wastewater to
the Metro System. In March 2005, an amendment to the Sewage Disposal Agreement between
the Alpine and Lakeside Sanitation Districts, and the City of San Diego, was approved. This
Agreement provided for a combined district fair share reimbursement of $3,471,000 towards
East Mission Gorge Interceptor upgrades.
The sewer upgrades were financed by the City of San Diego and will allow for continued and
expanded use of the Interceptor to meet future needs. The amended agreement also permited the
Lakeside SD to remove a Flow Equalization Facility which was previously constructed to help
reduce peak sewage flows from Alpine and Lakeside (See Policy I-106 below).
24
Board of Supervisor Policies
The following Board of Supervisor Policies, which would be assumed by the proposed “San
Diego County Sanitation District”, and previously summarized in the SVSD section, are also
applicable to the Lakeside SD:
I-36, I-48, I-51, I-78, I-84 and I-99.
I-106: Establishment of Priorities for Limited Sewer Capacity in the Mission Gorge Trunk Sewer
Line
Policy I-106 was established in 1986 at a time when the City of San Diego expressed concerns
that the Mission Gorge Truck sewer was experiencing surcharging during periods of peak
sewage flow, particularly during wet weather conditions. Shortly after the Policy became
effective, the Lakeside SD constructed a “Flow Equalization Facility” at its abandoned treatment
plant site. This facility consisted of a large storage tank designed to “capture” peak sewage
flows for later release to Metro during non-peak hours. It was used only infrequently and has
since been removed from service.
Policy I-106 will be reviewed for continuance by as part of the General Plan update process.
Policy I-106 attempts to manage wastewater discharges from the Alpine and Lakeside Sanitation
Districts and Winter Gardens Sewer Maintenance District (which feed into the City’s Mission
Gorge system). The policy gives priority for new sewer connections to lands located within the
current district boundary. Annexations are permitted under certain conditions:
Lakeside - property must be completely surrounded by the sanitation district, and
be located within the sphere of influence and urban limit line.
Alpine - property must be located within the Country Town Boundary, unless the
Board finds that annexation would provide a needed public facility such as a
school, fire station or library.
Exemptions to Policy I-106 allow sewer extensions to occur beyond district boundaries where
health or safety reasons can be demonstrated. This includes septic system failures. Since the
policy became effective, less than five (5) annexations have been permitted in the Alpine and
Lakeside Sanitation Districts which required a waiver of the policy.
In 1996 , the City of San Diego completed improvements to the Mission Gorge Trunk sewer
system, including the East Mission Gorge Interceptor discussed above. This resulted in
additional system capacity for future need by the East County agencies that rely on Metro
(Alpine SD, Lakeside SD, Winter Gardens Sewer Mainteance District, Padre Dam MWD and the
City of El Cajon). Policy I-106 state that “ Until such time as the district engineer can
demonstrate that sufficient capacity is or will be available in the Mission Gorge Trunk Sewer or
by other means of treatment or disposal” sewer committments or wastewater discharge permits
25
would be issued according to established criteria. The Mission Gorge pump station, force main,
and trunk sewer link have sufficient capacity for projected buildout of the adopted County
General Plan Policy I-106; consequently the criteria is no longer applicable.Due to the fact that
Policy I-106 was initially created as a result of sewage conveyance problems, which have since
been corrected, the policy should be reviewed in conjunction with the General Plan Update.
Sewer Service Charges
In 2004, the Board of Supervisors approved a seven and one-half percent (7.5%) sewer service
charge increase for Lakeside SD customers to be collected over a five year period. This was is
the first approved rate increase since 1997. Annual sewer service rates, which are collected on
the County tax rolls, have been unchanged since 2008. As of July 1, 2009 the annual amount is
$380 per EDU. The connection capacity (“buy-in”) fee is $2,000 per EDU and the annexation
fee is $500 per EDU. These fees have remain unchanged since 1988.
Approval of the proposed “San Diego County Sanitation District” would mean that Lakeside
customers would be subject to a new rate. The proposed annual rate for FY2011-2012 would be
$336 or a reduction for customers of $44.00.
Contractual Service Agreements
In 1984, the Lakeside SD agreed to reserve 253 EDUs of sewer capacity for the proposed High
Meadow Ranch residential development, located outside the district boundary near the Barona
Reservation. At that time, contractual service agreements were not subject to LAFCO review.
While postponed for many years due to ownership changes and economic conditions, the project
is now proceeding toward completion. Lakeside SD had initiated annexation proceedings to
include High Meadow Ranch within the district. Subsequent to the preparation of the June 2007
MSR/SOI study, High Meadows Ranch was annexed to Lakeside Sanitation District as part of
the Upper San Diego River Reorganization.
Community Planning Areas
The Lakeside Community Planning Area covers approximately 80 sq. mi. The area is
represented by the Lakeside Planning Group (LPG). The LPG is the advisory body that reviews
and provides comments on land use matters to the County Planning Commission and Board of
Supervisors. The Group meets twice per month. The Lakeside area consists of an urbanized
commercial core area surrounded by suburban and rural development. Sewer service is provided
to the commercial area and surrounding residential areas. Other, lower density suburban and
rural areas are served by subsurface septic systems. Figure 7 shows the boundaries of the
Lakeside CPA.
General Plan 2020 - Community Planning Goals
26
The Lakeside Community Planning Area is projected to grow from an existing population of
approximately 75,447 to a General Plan Update projected goal of 85,590 to 86,720, depending
on the alternative. The existing General Plan forecasts a population of 91,620. Figure 8 shows
the proposed General Plan Update land uses for the Lakeside area.
Service Implications for Lakeside Sanitation District
According to the General Plan Update population forecast, approximately 10,143-15,300 new
residents will be added to the Lakeside CPA. Some of this growth will occur in areas that are to
remain suburban/semi-rural, consistent with historical “country” lifestyle of the area. However,
continued residential and commercial growth is expected to occur in areas of higher density that
will require sewer service. Therefore, the Lakeside SD uses CPA forecast as a guide for planning
future capital projects, but must also supplement that information with additional district level
analysis. Lakeside SD recently completed a Facility Plan Study to determine future system
needs and requirements to ensure the District will have sufficient facilities available to
accommodate future system users.
The Facility Study projects that the ultimate capacity (beyond 2020) required for Lakeside SD
planning purposes will be approximately 17,700 EDUs, or about 4,300 EDUs more than the
2005 estimate of 13,400. Subtracting 560 EDUs (13 percent historical average) for
commercial/industrial uses results in a residential component of 3,700 EDUs. Based on
SANDAG projected household size of 2.9 people per household in the Lakeside CPA, this
equates to an increased population of about 10,700 new residents within the Lakeside SD, or
about 41,200 new users by 2020 or later. According to the Facility Study, this will result in about
1,000,000 gallons per day (1 mgd) in increased wastewater flow to be generated within the
district over the next 20 – 30 years.
These projections may be optimistic. According to district records, an average of approximately
115 EDUs have been permitted during the past five years prior to the preparation of this
MSR/SOI study. Due to the economic slowdown, very few connections have been issued since
2007. Using this trend as a benchmark, some 1,700 EDUs would be added to the district system
by the year 2020. This converts to an estimated added population of about 5,000, or sewage flow
increase of about 400,000 gpd.
Lakeside SD currently has 4.1 mgd of contracted Metro capacity rights with present discharges
to Metro averaging 2.5 mgd. The addition of 400,000 gpd of future flow into the system is well
within the Metro limit. However, an additional 1.0 mgd of discharge will bring Lakeside SD
closer to its Metro capacity limit. Whichever projection turns out to be the more accurate,
sufficient Metro contract capacity appears to be available to support General Plan Update
objectives for the area. However, at some future point, additional Metro capacity may be
required to support further sewer dependent growth in the Lakeside area. This capacity may or
may not be available to Lakeside SD depending on overall Metro service demands at that time.
27
The Lakeside SD Facility Study and capital improvement plans, which address short and long-
term infrastructure issues for the Lakeside SD, will be reviewed further in the Section II (2),
Planning for Infrastructure, Facilities and Services.
Alpine Sanitation District
The Alpine SD was formed in 1952 and operates and maintains the public sewer system for the
unincorporated community of Alpine. The Alpine SD is located in the eastern foothills of the
County, approximately 30 miles east of the City of San Diego. Most of the Alpine watershed is
located within the Sweetwater River System, which drains to the southwest and into San Diego
Bay. The District is comprised of approximately 1.4 square miles with a total of 1,200 customer
accounts. As part of the proposed reorganization, the district would be dissolved and the
responsibilities would be transferred to the proposed “San Diego County Sanitation District.”
The Alpine sewage system originally consisted of a series of sewer collectors, one trunk sewer,
and a wastewater treatment plant. Treated effluent from the plant was discharged into Alpine
Creek, a tributary of the Sweetwater River, until 1970. The stream discharge was terminated as a
result of a cease and desist order issued by the California Regional Water Quality Control Board.
Extensive improvements were completed to the Alpine sewage system as a result of this order.
Improvements included construction of the Galloway Pumping Station, located near the
intersection of Arnold Way and Harbison Canyon Road. This pump station collects all sewage
from the Alpine system, and then transfers it out of the Sweetwater basin and into the San Diego
River basin.
In conjunction with construction of the Galloway Pumping Station, it was necessary to construct
the Galloway Force Main and gravity system. The pump station uses a 10 inch diameter force
main to lift 0.36 million gallons per day (mgd) of sewage up to a higher elevation near the
intersection of Dunbar Lane and Interstate 8. At this point, Alpine’s sewage then flows by
gravity into Lakeside SD system where it connects to the Flynn Springs Interceptor near Flynn
Springs County Park. From there, it flows through Lakeside SD and into the Metro System. In
2002, the force main ruptured due to adjacent construction activity resulting in an unauthorized
discharge of raw sewage. Although the discharge was quickly contained, it was in excess of
10,000 gallons and resulted in issuance of a violation notice from the Regional Water Quality
Control Board. The force main sewer had been planned for replacement and has now been
upgraded with a new parallel line.
Overall, the District maintains 21 miles of sewer collection and transmission facilities. Alpine
SD operations are considered adequate to meet current system demands. Facility plans and
future system improvements are reviewed further in Section II (2), Planning for Infrastructure,
Facilities and Services.
28
According to SANDAG, the year 2008 population of Alpine is 17,350. However, much of this
population resides outside of the Alpine SD. The current number of EDUs generated in the
Alpine SD is 2,456. This translates to an average daily sewage flow of between 420,000 –
500,000 gallons per day (0.36 mgd based on a per EDU discharge rate of 170 - 240 gpd/EDU.
The District has 44 EDUs committed to potential customers. There are 590 EDUs allocated for
commercial accounts, 1,860 EDUs for residential. The Alpine SD residential population is
estimated at about 5,000 as of 2005.
District Map and Watershed
Figure 9 shows the location, current boundary and sphere of the Alpine Sanitation District.
Figure 10 shows the location of major sewer facilities (including the Galloway Pump Station and
Force Main) and portions of the Sweetwater River watershed area.
Board of Supervisor Policies
Most of the Board Policies previously discussed also apply to the Alpine SD. As mentioned in
the Lakeside SD section, Board Policy I-106: Establishment of Priorities for Limited Sewer
Capacity in the Mission Gorge Trunk Sewer Line applies to Lakeside SD and Alpine SD. To be
considered for annexation to the Alpine SD, a “property must be located within the Country
Town Boundary, unless the Board finds that annexation would provide a needed public facility
such as a school, fire station or library.” There have been no annexations to the Alpine SD
located outside the Country Town Boundary since Policy I-106 became effective. However, now
that the Mission Gorge pump station, force main and trunk sewer line have sufficient capacity for
projected buildout, the criteria described in the policy are no longer applicable. It is anticipated
this policy will be reconsidered as part of the General Plan Update.
Sewer Services Charges
In 2004, the Board of Supervisors approved a seven and one-half percent (7.5%) sewer service
charge increase for Alpine SD customers to be collected over a five year period. This was the
first approved rate increase since 1992. Annual rates are collected on the County tax roll.
Annual rates have remained unchanged since 2008 and remain at $418 per EDU. The connection
capacity (“buy-in”) fee is $2,300 per EDU, and the annexation fee is $1,000 per EDU. These fees
have remained unchanged since 2004. Compared to Lakeside SD, annual sewer service charges
for Alpine SD are somewhat higher and reflective of the smaller customer base and higher
system costs due to operation of the Galloway Pump Station and Force Main.
A combined district will result in a decrease in annual sewer service charges for FY2011-2012
from $418 to $336 per EDU.
29
Contractual Service Agreements
In 1998, the Alpine SD approved an extraterritorial service agreement with the Alpine Union
School District to allow for construction of the Joan McQueen Middle School on south Tavern
Road. The school site is approximately one mile outside of the district boundary. Because it was
determined to be a needed public facility the school project was exempt from Policy I-106. Due
to its distance from the district boundary, annexation of the school might have created pressures
for other properties to propose annexation.
The south Tavern Road area was not planned for densities that would necessitate public sewer
service; therefore, the school district and Alpine SD agreed that a contractual service agreement
was the preferred option, in lieu of annexation. The school district further agreed to own and
maintain that portion of the sewer extension outside the district boundary, and prohibit any
connections to the sewer without first obtaining County approval. The sewer discharge flows by
gravity through a siphon and joins the Alpine SD system near the intersection of Tavern Road
and Arnold Way.
The Alpine SD also provides outside services to a subdivision and elementary school located
along Harbison Canyon Road. A pump station conveys sewage from this site to the Galloway
pump station where it joins the Alpine SD discharge. The proposed “San Diego County
Sanitation District” would continue to fulfill these contractual service agreements.
Community Planning Area
The Alpine Community Planning Area (CPA) covers approximately 108 sq. mi. The area is
represented by the Alpine Planning Group (APG). The APG is the advisory body that reviews
and provides comments on land use matters to the County Planning Commission and Board of
Supervisors. The Group meets once per month. The Alpine area consists of a medium density
residential/commercial core area, surrounded by semi-rural and rural development. Wastewater
services are limited to the medium density residential and commercial areas located along Alpine
Blvd., Arnold Way and Tavern Road. The remainder of the Alpine CPA is served by individual
septic systems. Figure 11 shows the location of the Alpine CPA.
General PlanUpdate– Community Planning Goals
The Alpine Community Planning Area is projected to grow from an existing population of
approximately 16,700 to a General Plan Update projected goal of 25,070-27,390, depending on
the alternative. The sanitation district’s residential population is projected to grow by about
3,000 EDUs (8,500) and commercial growth by about 1,000 EDUs. This results in about 13,500
projected users by 2020 (or beyond). These estimates are based on the results of the Alpine
Facility Plan Study projections which go beyond 2020 planning targets. Combined, total future
sewage flows for Alpine SD planning purposes are estimated at 1.5 mgd, or a flow increase of
just over 1.0 mgd above the current discharge of 0.36 mgd.
30
However, by the year 2020, projected flows will likely be far less. According to district records,
the number of wastewater discharge permits issued during the past five years averaged about 25
EDUs per year. Projecting this trend out to 2020 (375 additional EDUs), future sewage flows
could be more in the range of 90,000 gpd. If Board Policy I-106 should be modified or
eliminated in the future, such action might impact the extent or location of future developments
in the Alpine CPA which require sewer service. Figure 12 shows proposed General Plan Update
land uses for the Alpine area.
Service Implications for Alpine Sanitation District
According to General Plan Update population forecast, approximately 7,720-10,040 new
residents will be added to the Alpine CPA. Much of this growth will occur in areas that are to
remain semi-rural/rural, consistent with historical “country” lifestyle of the area. As noted above,
some residential and commercial growth will continue to occur in areas of higher density
requiring centralized sewer service. Therefore, the Alpine SD uses CPA forecast as a guide for
planning future capital projects, but must supplement that information with additional district
level analysis. The purpose of the Facility Plan Study is to determine future system needs and
requirements to ensure the District will have sufficient facilities available and operational to
accommodate future system needs.
As discussed above, the Facility Plan Study projects the ultimate capacity required for Alpine SD
planning purposes (beyond 2020) will be approximately 7,000 EDUs, or about 4,500 EDUs more
than the 2005 estimate of 2,400 EDUs.
Alpine SD currently has 0.72 mgd of Metro capacity rights with present discharges to Metro
averaging 0.42 mgd. The remaining 300,000 gallons (0.3 mgd) of capacity rights can support
over 1,200 new EDUs before additional Metro capacity would be required. Should recent growth
trends prove to be more accurate than Facility Plan projections; sufficient Metro contract
capacity will be available along with an adequate reserve capacity. Conversely, the addition of
1.0 mgd of long-term discharge to Metro would, as suggested in the Facility Plan Study, exceed
Alpine SD Metro capacity rights. Therefore, at some future stage, additional Metro capacity
may be required to support continued sewer dependent growth in the Alpine area. The Alpine SD
Facility Plan Study and capital improvement plans address short and long-term infrastructure
issues for the Alpine SD and will be addressed further in Section II (2), Planning for
Infrastructure, Facilities and Services.
Future Tribal Sewer Service
Recently, a preliminary sewer service study was commissioned for the Ewiiaapaayp Tribe to
determine the costs and feasibility of extending Alpine SD sewer facilities to serve a proposed
casino near the present site of the Viejas Casino and Outlet Center. This concept was later
abandoned due to joint agreement between the Viejas and Ewiiaapaayp Tribes. The agreement
authorizes Ewiiaapaayp Tribe to construct a new casino on the Viejas Reservation which,
presumably, will utilize the existing or another on-site wastewater treatment facility. The new
31
casino would be located just east of the Viejas Casino. If the combined sewer flows should ever
cause problems with existing reservation treatment and discharge facilities, annexation to Alpine
SD or, alternatively, a contractual service agreement, might be proposed as an option to
continued on-site treatment. At the time of preparation of this amendment, reservation treatment
and discharge facilities have not required a contractual service agreement with Alpine Sanitation
District.
Julian Sanitation District
The Julian Sanitation District was formed in 1945 in the unincorporated mountain community of
Julian. Julian is located approximately 60 miles northeast of San Diego along Highways 78/79.
The District is 0.19 square mile in size (119 acres). The population of the greater Julian area is
approximately 3,049. As previously noted, the district is proposed to be dissolved with the
proposed “San Diego County Sanitation District” assuming the responsibilities.
The Julian SD sewer system primarily serves the Julian central business district area. A total of
315 EDUs are allocated for commercial (215 EDUs) and residential (100 EDUs) uses. The
district’s current residential population is approximately 250–300. However, during periods of
high tourism, sewage flows can be much higher. The sewer collection system includes
approximately 3.0 miles of sewer pipe and a gravity conveyance line which transports sewage to
the Julian SD wastewater treatment facility. The facility is located approximately one mile west
of Julian off Highway 78.
Average daily sewage flows (gallons/day) per connected EDU fluctuate between 79-125 gpd.
This variance may be the result of recent local water conservation efforts which can also reduce
sewer flows. During fall and winter months, flows increase due to higher tourism levels, and
because of rainwater infiltration into the sewage collection system. This problem generally
worsens as collection systems age. The five year average flow rate is about 119 gpd per EDU.
This is less flow volume than what is generated in the more urbanized “Metro” sanitation
districts.
In spite of these lower per unit flows, the existing treatment plant is operating at maximum
capacity (.040 mgd). The Julian SD Board has imposed a sewer moratorium policy that severely
limits any new sewer connections due to the sewage treatment capacity problem. New sewer
permits in Julian are only issued under very strict criteria, such as a failing septic system, or to
previously purchased sewer commitments. Annexations are not allowed, except for septic system
failures. One exception occurred in August 1998 when the Julian School Districts were annexed
to the Sanitation District. Planned school improvements would not permit continued use of the
on-site sewage system. Connection to the Julian SD system required construction of a pump
station and force main. Since the school site was located within jurisdiction of the Colorado
Basin Regional Water Quality Control Board, coordination with that agency was also required.
32
Annexation of the school site, combined with current customer usage and purchased sewer
capacity, commitments, have raised sewer flows to levels which could exceed the treatment
plants operating limit ( .04 mgd). In the year 2000, district review of operating conditions at the
treatment plant concluded that a few additional connections could be accommodated. A priority
list was established along with criteria and standards for prospective users. This resulted in the
addition of 17 new connections to the system. Since that time, the only additional sewer
connection permitted was for a public restroom facility due to the acute shortage of restrooms
during periods of high tourist activity.
The Julian SD utilizes a secondary wastewater treatment system with effluent discharge by
means of spray irrigation. Upgrades to the plant were recently completed which included the
following:
1. Replacement/relocation of a large septic tank which serves as a
pretreatment facility to help capture large amounts of grease common in
Julian wastewater discharges.
2. Return Activated Sludge (RAS) Pump to serve as backup to the pump in
operation. If the existing pump failed without a backup, effluent quality
would be negatively affected and could cause a violation of the discharge
permit.
3. Construction of a second aerobic digester. The new digester provides a
proper-sized facility to augment the existing undersized digester. It also
provides temporary back-up when the main digester is taken out of service
for maintenance/repairs.
These improvements were financed with a $247,000 Federal grant/loan from the U.S.
Department of Agriculture, Rural Development Administration and local district and County
funding of $172,000 (total cost: $419,000). Treatment plant upgrades did not allow for any
additional system capacity. There are no foreseeable plans to expand system capacity; therefore
the moratorium on sewer connections is expected to continue indefinitely.
Present wastewater flows into the treatment plant are averaging approximately 30,000 gallons
per day, however this flow rate is frequently exceeded during peak weekend periods when the
Julian town center experiences an influx of tourists. The Regional Water Quality Control Board
(RWQCB) permit allows for an effluent discharge limit of 40,000 gallons per day. In-flow rates
in excess of 60,000 gallons have been recorded during peak weekend periods and wet weather
conditions. During periods of high in-flows, large on-site effluent sorage basins are utilized to
maintain dischard gate within permit limits. However excessive in-flows rates do not violate the
RWQCB permit which only limits the rate of effluent discharge. Over the past five years, no
violations have been issued by the RWQCB. The RWQCB permit also requires the preparation
of a plan for future plant expansion when wastewater flows reach 75 percent of discharge limits
or, alternatively, a plan to operate within permit limits. As discussed below, the District has
33
imposed a service moratorium that is expected to continue for the foreseeable future. The District
Board’s action has essentially become the future wastewater management plan for the Julian SD.
District Map and Watershed
Figure 13 shows the location, current boundary and sphere of the Julian SD. Figure 14 shows
the location of backbone sewer facilities and portions of the upper San Diego River watershed
area.
Board of Supervisor Policies
In addition to previously discussed Board Policies, the Julian SD Board of Directors adopted
Policy I-113: Establishment of Priorities for Limited Sewer Capacity in the Julian Sanitation
District, on June 20, 1989. The purpose of the policy was to provide a process to allocate limited
sewer capacity in the district. As explained above, these allocations have now been completed
and there is no further capacity available for new or expanded projects (with the exception of a
small amount of capacity reserved for failing septic systems). There are no plans to expand
treatment capabilities, and no surplus capacity remains for new connections.
As a condition of approval of the reorganization, the proposed “San Diego County Sanitation
District” would be required to adopt Policy I-113.
Sewer Service Charges
In 2002, the Julian SD Board of Directors approved a five percent (5%) sewer service charge
increase for Julian customers to be collected over a five year period. This was the first rate
increase since 1992. As of July 1, 2009 the annual sewer service charge is $ 705 per EDU and
collected on the County tax rolls. The rate has been unchanged since 2006. The connection
capacity (“buy-in”) fee is $4,000 EDU, and the annexation fee is $1,000 per acre which has been
unchanged since 1994. Compared to other sanitation districts, annual sewer service charges for
Julian SD are considerably higher. This reflects the small customer base and additional cost to
operate a local wastewater treatment facility.
The proposed first year rate (FY 2011-12) for the proposed “San Diego County Sanitation
District” would result in a significant decrease from $705 per EDU to $336 per EDU.
Contractual Service Agreements
Julian SD presently has no contractual service agreements.
34
Community Planning Area
The Julian CPA covers approximately 52 square miles. The area is represented by the Julian
Planning Group (JPG). JPG is the advisory body that reviews and provides comments on land
use matters to the County Planning Commission and Board of Supervisors. The Group meets
once per month. The Julian area consists of low density residential development surrounding a
commercial town center area. Wastewater service is limited to the core commercial area along
Main Street and Highway 78. There are some residential units and apartments (estimated
population - 200) within the core area. The remainder of the Julian CPA is served by individual
septic systems. Figure 15 shows the location of the Julian CPA.
General Plan Update – Community Planning Goals
The Julian Community Planning Area is projected to grow from an existing population of
approximately 3,000 to a General Plan Update projected goal of between 3,049-4,280
depending on the land use alternative. Most of this growth will occur in the greater Julian area,
outside sanitation district boundaries, due to the sewer moratorium and the general plan goal to
preserve the area’s rural character. Figure 16 shows proposedGeneral Plan Update land use for
the Julian area.
Service Implications for Julian Sanitation District
Due to the district sewer moratorium, limited customer base and funding, and General Plan
Update goals to retain Julian’s present rural character, the district has no service expansion plans
for the foreseeable future. The district will continue to operate and maintain the existing system
in compliance with the Regional Water Quality Control Board’s Discharge Permit.
Pine Valley Sanitation District
The Pine Valley Sanitation District was formed in 1968 and is located in the eastern portion of
San Diego County off of Interstate 8, Pine Valley Road and Old Highway 80 approximately 45
miles east of San Diego. The District consists of approximately 52 customer accounts (43
residential EDUs, 65 commercial EDUs) with a population of approximately 150. The Pine
Valley SD area is 28 acres in size, or 0.04 square mile. The Pine Valley Sanitation District is
proposed for dissolution as part of the proposed “San Diego County Sanitation District.”
The District consists of 0.7 miles of sewer collection pipe which conveys sewage to a 40,000 gpd
(0.04 mgd) treatment plant. The average daily flow rate was 10,500 gpd (0.0105 mgd) as of April
2004. This is about 25 percent of total of treatment capacity. The flow rate is unchanged.
Wastewater treatment is processed at the secondary level using aerated oxidation ponds. The
treated effluent is disposed of through percolation and evaporation in ponds adjacent to the
facility, and discharged into the groundwater system. Pine Valley SD operations are considered
35
adequate to meet current system demands. Future system improvements and plans are
determined on an as needed basis, rather than on a predetermined schedule.
It is important to note that the Pine Valley groundwater system is also the primary source of
domestic water supplies to area residents and businesses. Therefore, caution must be applied in
area wastewater (and septic) management activities to ensure this “sole source” supply remains
adequate for domestic uses.
District Map and Watershed
Figure 17 shows the location, current boundary and sphere of the Pine Valley SD. Pine Valley
area residents receive domestic water from the local mutual water company, or from private
wells. Figure 18 shows the location of major sewer facilities and portions of the upper Tijuana
River watershed.
Board of Supervisor Policies
There are no additional Board Policies that specifically apply to the Pine Valley SD. Other
Board policies (described earlier), which apply to all sanitation districts, are also applicable to
Pine Valley SD operations.
Sewer Service Charges
The current annual sewer service charge for Pine Valley SD customers is $636 which has been
on the tax roles since 1991, . Similar to the Julian SD, annual sewer service charges for Pine
Valley are considerably higher than other urban districts due to the small customer base and
additional cost to operate a local wastewater treatment facility. If the proposed San Diego
County Sanitation District is approved, the first year rate (FY 2011-2012) would decrease from
$636 to $336 per EDU. The connection capacity (“buy-in”) fee is $2,000 per EDU; the
annexation fee is $1,000 per acre.
Contractual Service Agreements
Pine Valley SD serves the County park and library through a contractual service agreement. The
proposed “San Diego County Sanitation District” would continue to fulfill these contractual
service agreements.
Community Planning Area
The Pine Valley CPA covers approximately 150 sq. mi., most of which are public lands located
within the Cleveland National Forest. The CPA is represented by the Pine Valley Planning
Group (PVPG). PVPG is the advisory body that reviews and provides comments on land use
matters to the County Planning Commission and Board of Supervisors. The Group meets once
per month. The CPA consists of low density residential and rural development surrounding a
36
commercial town center area. Wastewater service is limited to the core commercial area along
Old Highway 80, including some residential units and apartments (estimated population - 150).
The remainder of the Pine Valley CPA is served by individual septic systems. Figure 19 shows
the location of the Pine Valley CPA.
General Plan Update – Community Planning Goals
The Pine Valley CPA is projected to grow from an existing population of approximately 2,400 to
a General Plan Update projected goal of 2,900. Most of this growth will likely occur outside the
District boundary and remain semi/rural in accordance with General Plan Update goals. Figure
20 shows proposed General Plan Update land uses for the Pine Valley area.
Service Implications for Pine Valley Sanitation District
Wastewater flows generated in Pine Valley have fluctuated somewhat over the years due to
changes/vacancies in commercial activity. These uses represent the majority of the District’s
customer accounts. With current flows consuming 25 percent of treatment capacity, the District
has sufficient wastewater treatment capacity to meet anticipated future demands. The District
plans to continue with current operation and maintenance programs in compliance with the
Regional Water Quality Control Board’s Discharge Permit. However, due to excess sewer
capacity available, the District appears capable of accommodating additional service
connections.
Other County Wastewater Management Operations
The County of San Diego also operates and maintains other water/wastewater management
facilities, not presently subject to LAFCO review. Below is a brief summary of these activities
and programs:
Sewer Maintenance Districts (SMD)
Pursuant to Chapter 26, Sections 5820 – 5856 of the California Streets and Highways Code,
SMDs can be established to provide sewer collection services to unincorporated area residents
when the Board of Supervisors determines such services are necessary, and where no other
alternate entity is able or available to perform such services. SMD’s may be formed by
resolution of the Board of Supervisors following written notice to affected residents/property
owners.
1. Winter Gardens SMD
The Winter Gardens SMD was established in January, 1964 to provide sewer collection
service to the Winter Gardens area, located between Lakeside to the east, Santee to the
37
west and El Cajon to the south (Figure 21). Figure 22 illustrates the boundaries of several
hydrological subareas of the San Diego Watershed that overlap the Winter Gardens
Sewer Maintenance District and the existing sewer collection system. If the proposed
“San Diego County Sanitation District “ is formed, the maintenance district would be
dissolved by the Board of Supervisors. Winter Gardens SMD contracts with Metro for
sewage treatment/disposal. The Metro agreement provides for 1.3 mgd of capacity
rights. Present flows average 0.88 mgd with approximately 3,700 connected EDUs (3,340
residential EDUs; 360 commercial EDUs). The District’s current population is
approximately 9,700. Future land uses within the area are governed by the Lakeside
Community Plan (Figures 23 & Figure 24). Winter Gardens SMD is close to built- out
with little area remaining for future growth. Annual sewer service charges are $216.
This fee would increase to $336 for the first year of the new district (FY2010-11).
However, the current level of revenue is insufficient to fund O&M expenditures. The
connection capacity fee is $1,000 per EDU; annexation fee is $500 per EDU.
2. East Otay Mesa SMD
The East Otay Mesa SMD was established in June, 1999 to provide sewage collection
services for the unincorporated East Otay Mesa area (Figure 25). If the proposed “San
Diego County Sanitation District “ is formed, the maintenance district would be dissolved
by the Board of Supervisors. Figure 26 shows the Otay Watershed (Otay Valley Hydro
Subarea) and the Tijuana Watershed (Water Tanks Hydro Subarea) which overlap the
sewer maintenance district. The East Otay Mesa Specific Plan has designated the area for
commercial/industrial development. At present, the backbone sewer system consists of
one sewer outfall which was constructed to accommodate a recently built electrical
generating station. The power plant has been constructed. Other facilities are planned
which will be constructed as development occurs. There are also four other customers
currently connected to the system including Pilot Travel Center, Fedex Ground Shipping
Center, a Sheriff’s Substation and a restaurant.
There are currently 407 EDU’s generating approximately 114,000 gpd. It is anticipated
additional projects will come on-line over the next 5-10 years. The maintenance district is
within the Otay Community Planning Area (Figure 27). As depicted on Figure 28, the
area is designated as Specific Plan Area. The East Otay Mesa Specific Plan, which
governs the area, provides further information regarding proposed development. The
District has 1.0 mgd of Metro treatment/disposal capacity rights. This capacity was
purchased from the Spring Valley Sanitation District, and payments to SVSD will begin
as development occurs. Connection capacity fees range between $1,000 - $2,500 per
EDU depending on the type of project. Annual sewer service charges are $310/EDU.
This fee would increase to $336 /EDU. Projects in East Otay Mesa SMD are also charged
38
fees to reimburse the City of San Diego for capacity in two municipal trunk lines that
serve the area. The proposed “San Diego County Sanitation District” would continue to
collect these reimbursement fees.
3. County Facility Wastewater Systems Support
The County Public Works Department, Wastewater Management Section provides
wastewater collection and treatment services to the San Pasqual Academy (Children’s
Foster Care Facility), Sheriff (Descanso Detention Facility), Parks Department (Heise
Park) and the Probation Department (Camp Barrett). Water supply service is also
provided in some cases. These areas, because of their unique nature, will continue to be
directly served by the County Public Works Department rather than the proposed “San
Diego County Sanitation District.”
4. Campo Water and Sewer Maintenance District
Campo Water and Sewer Maintenance District was formed in May 2007 (Figure 29). Water
and sewer service is provided to Campo Hills, a 220 residential subdivision. There are also
about 45 private customers in Rancho Del Campo and several County departments who
have offices/facilities in the area. This includes the U.S. Department of Homeland Security
- Border Patrol Station.
The Rancho Del Campo (RDC) Water Pollution Control Facility (WPCF) is located at
31035 Forest Gate Road, Campo, with an average flow of 50,000 gallons per day (gpd)
(Figure 30). The treatment plant and sewer collection system serves both Rancho Del
Campo Community and Campo Hills Development which consists of approximately 315
EDUs. The County of San Diego is currently mapping the location of the various sewer
pipes in the collection system to add to their geographic information systems (GIS) data
base.
The Rancho Del Campo WPCF is a secondary treatment plant with processes consisting of
an Imhoff tank, a trickling filter, two secondary clarifiers, four percolation beds, anoxic
tanks and a sludge drying bed. The facility permitted effluent discharge is 114,000 gallons
per day.
The water supply permit for the Campo Hills Water System was issued on October 2004 by
the State of California to supply water for domestic purposes to the newly developed
Campo Hills Subdivision. The water system is a small community water system that is
capable of supplying water for domestic purposes to approximately 730 permanent
residents. The water system receives raw water from two active wells with total pumping
capacity of 500 gpm that are under the direct influence of surface water and produce water
with high levels of uranium and manganese. The water produced from the wells is treated
through the PV-150 surface water treatment system incorporating coagulation,
clarification, filtration, and disinfection followed by ion exchange system for uranium
39
removal. The treated water is discharged to two 40,000 gallon bolted steel above ground
chlorine contact tanks located near the treatment plant, then boosted via two 20hp
centrifugal pumps to a 700,000 gallon bolted steel tank located approximately 1 mile away
on a hill, which serves the single pressure zone distribution system via gravity.
The RDC Water System was built by the US Army in 1941 to serve Camp Lockett used by
the Army. In June 1950, the federal government transferred the public water system to the
County of San Diego. The County has operated the system since that time, primarily to
serve Rancho Del Campo Juvenile Facility and support County operations in the Campo
area that include Parks and Recreation, Public Works, Sheriff and General Services. The
Federal government sold portions of Camp Lockett to individual owners who also depend
on the water service for domestic and commercial uses. The system consists of two 110 ft
(Well #1 and #3) and one 170 ft (Well #4) deep active wells with a total pumping capacity
of 240 gpm, approximately 70,000 feet or 13.25 miles of water distribution lines.
Since 2005, the pumped water has been treated for uranium using the leased uranium
removal ion exchange system. The treated water is sent to two steel bolted plate reservoirs
(55 feet in diameter and 24 feet in height) providing storage capacity of approximately
726,000 gallons. Approximate district population is 600 with 260 connections. Services
area is 0.72 square miles/463 acres. Annual sewer charges are $660. This rate would
decrease for the first year (FY2011-12) to $336 within the proposed “San Diego County
Sanitation District.” Water service charges for Campo Hills are $1,320 annually. Rancho
Del Campo water service charge include a base rate of $65 and a two tier commodity rate.
The Campo Water and Sewer Maintenance District is within the Mountain Empire
Planning Area (Figure 31). Figure 32 depicts land uses proposed by the Referral Map for
the Campo community.
The maintenance district is not proposed for dissolution. It will continue providing water
regardless if the responsibility for sewer service is ultimately transferred to the proposed
“San Diego County Sanitation District.”
5. Harmony Grove Maintenance District
The Harmony Grove Sewer Maintenance District was established in April 2007; however,
no development has occurred to date. Harmony Grove Village is planned to cover
approximately 468 acres located in the County of San Diego north of where Harmony
Grove Road meets Country Club Drive (Figure 33). The property includes the DeRaadt
Dairy, the Harmony and Ward Egg Ranches as well as some surrounding properties. The
overall density will be 1.6 dwelling units per acre.
40
The developer of the proposed community will construct wastewater collection, treatment,
and disposal facility, and upon acceptance of completed improvements, the District will
assume responsibility for future operations and maintenance. Planning Area 1 of the
adopted Specific Plan includes a wastewater reclamation facility to be located on a nine-
acre site. In general, the facilities will consist of the plant and an adjacent wet weather
storage reservoir. The plant will produce reclaimed water for the irrigation of parks,
parkways, major slope banks and other common area landscaping. When the Harmony
Grove Village project is fully occupied, the wastewater treatment facility will receive an
average daily flow of 0.20 million gallons per day (mgd), and a projected peak flow of 0.71
mgd. As shown in Figure 34, the area is within the Carlsbad Watershed (Escondido
Hydrological Subarea).
The North County Metropolitan Subregional Planning Area (Figure 35) establishes land
use for the area within the sewer maintenance district. The County’s General Plan Update
Referral Map is shown as Figure 36. Development of the area is governed by the Harmony
Grove Village Specific Plan which provides for 742 single-family dwelling units,
supporting retail commercial and institutional uses.
The Harmony Grove Sewer Maintenance District is proposed to become part of the “San
Diego County Sanitation District”.
Conclusions
The Board of Supervisors has adopted several policies which provide guidance to the planning,
financing and delivery of wastewater services to the County sanitation districts. These policies
will continue to be implemented by the proposed “San Diego County Sanitation District.” The
districts which rely on Metro for wastewater treatment and disposal (Spring Valley, Lakeside,
Alpine and Winter Gardens) have adequate contact capacity at this time. Spring Valley SD
maintains several interagency agreements for use of the Spring Valley Outfall. Recent rate
increases have occurred in order to maintain present levels of service (except Pine Valley SD).
As proposed for FY 2011-12 as part of the “San Diego County Sanitation District, one district’ s
rate would be unchanged, (Spring Valley Sanitation District), five districts would see a decrease
in rates (Alpine Sanitation District, Julian Sanitation District, Lakeside Sanitation District, Pine
Valley Sanitation District and Campo Water and Sewer Maintenance District), two districts
would experience an increase (East Otay Mesa Maintenance District, with a small increase and
Winter Gardens Maintenance District) and one district currently does not have a rate (Harmony
Grove Sewer Maintenance District).
While the “Metro districts” will experience continued growth and are not expected to exceed
contracted capacity, this will need to be monitored closely in the future. Due to improved
41
conditions, Board Policy I-106, which regulates annexation and sewer connection activity in the
Lakeside and Alpine SD’s should be reviewed for continuance in conjunction with the General
Plan Update. The Julian Sanitation District is operating at capacity and applications for new
connections are not being accepted as outlined in Board Policy I-113. The Pine Valley SD sewer
flows average approximately 25 percent of system capacity. Circumstances concerning growth
and the ability to provide service are largely unchanged since adoption of the MSR/SOI in 2007.
While, the proposed “San Diego County Sanitation District” would not immediately change the
delivery of service, it is anticipated that the combined district may have greater flexibility to
respond to any future issues.
2. Planning For Infrastructure, Facilities and Services
Introduction
The ability of a local governmental agency to provide efficient and cost effective public services
is linked to an integrated program of short and long-range planning. Determining future service
needs – and developing strategic plans to ensure that physical and capital resources will be
available as required – is a fundamental activity of local government. Generally, these agencies
use master plans coupled with capital improvement plans (CIP), or variations of these processes,
as planning tools. Long range master plans are especially important for agencies that have
abundant developable territory or are experiencing significant growth.
There is no legal requirement regarding the frequency for preparing master plans or CIP’s;
however, five-year master plan and CIP updates have become prevalent in California. Preparing
and updating master plans and CIP’s at periodic intervals allows agencies to evaluate and
respond to changing conditions through an organized process. This process also provides
opportunity for input from the public, and other interested/affected agencies.
The County sanitation districts generally update wastewater facility master plans in ten year
intervals unless circumstances require more frequent assessments (e.g., unanticipated
development proposals). The five year CIP program is then used for scheduling system
improvements and upgrades during the annual budget process. County land use plan updates
occur more infrequently than district master plan reviews, therefore coordination problems in
developing projections for future service may occur.
The choice of appropriate planning processes can be influenced by such factors as an agency’s
geographic size, population, density, or age of infrastructure. Agencies serving predominately
built-out territory or areas with little expectation of growth are, as a rule, concerned with routine
maintenance and the upgrade of aging infrastructure to meet new safety and regulatory standards.
Preparing master plans under such conditions is usually based on a less intensive planning
process.
42
Planning creates a vision for providing future services; however, the vision will not materialize if
plans are not put into action. Timely funding choices must be pursued in order to achieve the
service goals established by the planning process. Implementation schedules should be
developed and strictly followed, and adequate resources must be dedicated to capital projects if
proposed goals are to be achieved. Moreover, if maintenance or upgrade plans are deferred in the
budget or capital improvement process, not only will planned goals go unrealized, but also the
condition of infrastructure and existing levels of service could be degraded as well.
Spring Valley Sanitation District
In 2002, a Facility Plan Study was completed for the SVSD by the consulting firm of RBF
Engineers. The study area included the SVSD, sphere of influence, and other agency flows
which drain to the Spring Valley Outfall sewer and Metro. The SVSD consists of a collection
system and pump stations which convey wastewater downstream to the Metro system for
treatment and ocean disposal. The District’s current Metro contract capacity is 10.34 mgd.
The study area did not include the Otay Ranch. Otay Ranch officials had expressed interest in
future annexation to the SVSD to serve portions of that development, as an alternative to service
by Chula Vista. Based on discussion since the 2007 MSR/SOI adoption, sewer service will be
provided by the City of Chula Vista per the completion of a proposed service agreement with the
developer.
General Plan and Population Projections
During preparation of the Spring Valley SD Facility Plan in 2001/2002, General Plan Update
final land use allocations had not been determined by the Board of Supervisors. This required use
of existing County General Plan land use designations combined with SANDAG/County
population forecast. After General Plan Update population projections and land use allocation
maps became available (August 2006), the new data was incorporated into this report. No
significant service delivery issues were identified when compared with the earlier data.
The Facility Plan review process appears to provide a good basis for programming near-term
wastewater system repairs and/or expansion. During preparation of the next (10 year) facility
plan, adopted land use and population projections will be utilized, along with other information
(e.g., system operation and performance data), to determine future system requirements.
Sewer systems (esp. pipelines) are designed to operate for up to forty years or longer, while land
use planning programs generally cover a smaller (20 year) timeframe. Careful consideration
must be given to the design of system capacity needs so that future areas served will be
accommodated while avoiding growth inducement problems that can develop with oversized
wastewater facilities.
43
Development of the SVSD Facility Plan was divided into five-year time frames beginning in
2000 – 2010, and then to “ultimate” conditions. According to the Plan, the ultimate condition is
defined as complete build out of the existing district and sphere boundaries. Because General
Plan Update and the SVSD Facility Plan were initiated at different times and with different
timeframes, accurate and direct correlations between land use projections and facility planning
and design may not always be possible.
The SVSD was first divided into basins and sub-basins, and flow factors were then developed.
The County uses a flow rate of 240 gallons of wastewater discharge per day, per single family
dwelling unit (i.e., 1 EDU). The assumed household population is approximately 3.0 persons per
unit. Existing and projected land uses and corresponding population levels are then fed into
hydraulic models that determine where future system improvements/expansion will be required.
This process begins at the sub-basin level and is repeated throughout the district and sphere
areas. Tables 1 and 2 summarize SVSD population and EDU flow projection information:
Table 1
Existing and Future Population
Year 2000 EDUs* Year 2020 EDUs*
85000 27500 125000 36000
* Does not include commercial EDUs
Table 2
Existing and Projected Wastewater Flows
Million Gallons Per Day (MGD)*
2000 2005 2010 2020
7.70 mgd 7.95 mgd 8.20 mgd 8.60 mgd
* Includes residential and commercial flows
Planned Capital Improvements
The SVSD Facility Plan includes a projected 5/10 year capital improvement program to meet
future District needs. Improvements consist of various pipeline replacements and upgrades due
to age and condition. New or enlarged facilities to accommodate future demand are also
recommended. A list of CIP projects and suggested completion schedule may be found in Table
3. Identified upgrades include six sewer projects with an estimated total cost of $3,211,116.
44
Table 3
Recommended Capital Improvement Program
Name Diameter (in.) Length (ft) Year 2005 Cost Year 2010 Status
Cost
Broadview
15 70707 70700 Completed
Trunk
Calavo Trunk 12 4665 902100 Pending
Jamacha Trunk 10 3246 773500 Completed
Trunk B 12 1148 322400 In Design
Phase
Trunk DI 12 – 18 2292 704700 Starting
Design
Trunk EII 10 2656 437700 Pending
Total Cost 2773400 437700
Over the last several years, additional capital improvement projects have been added to the CIP
program including: 1) Jamacha Siphon By-Pass which was completed for $800,000; 2) Jamacha
Pump Station, a $7.2 million project which is the design phase; and 3) Rancho San Diego Pump
Station Upgrade, a $3.6 million project which is also in the design phase.
One of the conditions of the proposed “San Diego County Sanitation District” would be that CIP
reserve funds accumulated by each district as of the effective date of the reorganization would be
spent on identified CIP programs that benefit that district.
Financing Capital Improvements
The SVSD finances the majority of capital improvements and facility upgrades with District
reserves and development connection fees. Grants and loans have seldom been used. A portion
of the annual operation and maintenance charges (i.e., annual sewer service charge) are set aside
in the reserve fund for future system maintenance. In cases where a pipeline must be replaced
due to age and condition but will also be enlarged to accommodate growth, financing will occur
through a combination of “replacement reserve” and “expansion reserve” funds, which are
retained in separate budget accounts. This is discussed further Section II (5), Fiscal Review.
Conclusion
Planning for future facilities and infrastructure in the SVSD is guided through the ten year
Facility Plan review/update process and the County General Plan. Based on review of the SVSD
planning and CIP documentation, it appears District sewerage facilities are in reasonably good
condition with problems areas identified and programmed for replacement/upgrade through the
facility planning process. Future growth is expected to continue in the District as noted in the
Facility Plan and General Plan Update reviews.
45
Although consideration was given to having portions of Otay Ranch as a Special Study area of
the Spring Valley Sanitation District, the area was not ultimately included as part of the 2007
MSR/SOI adoption. It is not being proposed as a Special Study Area as part of the 2010
Amendment for the proposed “San Diego County Sanitation District”.
Lakeside Sanitation District
Planning for future facilities and infrastructure in the Lakeside SD is guided through the ten year
Facility Plan review/update process and the County General Plan. In 2002, a Facility Plan Study
was completed for the Lakeside Sanitation District by the consulting firm of RBF Engineers.
The study area included the Lakeside SD, sphere of influence and development, which is subject
to a contractual service agreement – High Meadow Ranch. For planning purposes, contractual
service agreements are assumed to be connected and part of the existing served population. The
Lakeside SD consists of a collection system and pump stations which convey wastewater
downstream to the Lakeside Interceptor and into the Metro system. The District’s current Metro
contract capacity is 4.6 mgd. The Facility Plan addresses existing and future conditions in the
Lakeside SD and presents an improvement/replacement program designed to maintain and
(where required) expand system service to meet future needs.
Based on review of the Lakeside SD planning and CIP documentation, it appears District
sewerage facilities are in reasonably good condition with problems areas identified and
programmed for replacement/upgrade. The final facility plan report was used for internal
planning and capital budgeting purposes and was not presented for public or Board of Supervisor
review.
The RBF Facility Plan of 2002 did not evaluate approximately 6,195 acres that was annexed into
the district as part of the Upper San Diego River Reorganization. The area, comprised of land
north of the junction of SR-67 and Mapleview Street, and included territory on both the west and
east sides of the highway. This annexation was part of a larger proposal which changed the
boundaries of the Padre Dam Municipal Water District, Lakeside Sanitation District and
Riverview Water District. The County is in the process of updating the Sewer Master Plan for
the Lakeside Sanitation District.
General Plan and Population Projections
During preparation of the Lakeside Facility Plan in 2001/2002, General Plan Update final land
use allocations had not been determined by the Board of Supervisors. This required use of
existing County General Plan land use designations combined with SANDAG/County population
forecast. After General Plan Update population projections and land use allocation maps became
available (August 2006), the new data was incorporated into this report. No significant service
delivery issues were identified when compared with the earlier data.
Population projections are used to develop future EDU flow projections and sewer sizing
models. The Facility Plan was divided into five-year time frames beginning in 2000 – 2010, and
46
then to “ultimate” conditions. According to the Plan, the ultimate condition is defined as
complete build out of the existing district and sphere boundaries.
The Lakeside SD area was first divided into basins and sub-basins. Flow factors were then
developed. The County uses a flow rate of 240 gallons of wastewater discharge per day, per
single family dwelling unit (i.e., 1 EDU). The assumed household population is approximately
3.0 persons per unit. Existing and projected land uses and corresponding population levels are
then fed into hydraulic models that determine where future system improvements/expansion will
be required. This process begins at the sub-basin level and is repeated throughout the district and
sphere areas. Tables 4 and 5 summarize Lakeside SD population and EDU flow projection
information:
Table 4
Existing and Future Population
Year 2000 EDUs* Year 2020 EDU EDUs*
30500 10500 51300 17700
*Does not include commercial EDUs
Table 5
Existing and Projected Wastewater Flows
Million Gallons Per Day (MGD)*
2000 2005 2010 2020
3.2mgd 3.6mgd 3.95mgd 4.3mgd
* Includes residential and commercial flows
Planned Capital Improvements
The Lakeside Facility Plan includes a projected 5/10 year capital improvement program to meet
future District needs. Improvements consist of various pipeline replacements and upgrades due
to age and condition. New or enlarged facilities to accommodate future demand are also
recommended. A list of CIP projects and suggested completion schedule is included in Table 6.
Upgrades include fourteen pipeline projects, including 12 trunk sewer upgrades, with an
estimated total cost of $17,495, 400.
47
Table 6
Recommended Capital Improvement Program
Name Diameter (in) Length (ft) Year 2005 CostYear 2010 Cost Status
Lakeside Trunk Portion Being
15 4674 1443000
1 Constructed
Lakeside Trunk
15 3000 1030000 Pending
2
Lakeshore
12-18 2779 491000 797000 Pending
Trunk
Woodside Int. 33 63 43400 Pending
3
Flynn Sp Int. 2 15-18 5655 768000 1160000 Pending
Flynn Sp. Int. 3 12-18 5150 716000 1200000 Pending
Industry Rd.
15-36 6298 1196000 678000 Pending
Int. 1
Industry Rd.
18 1201 177000 288000 Pending
Int. 2
Lakeside Int. 1 30-33 6044 2816000 Portions
Constructed
Lakeside Int. 2 30-42 3036 1668000 Portions
Constructed
Mapleview
10 1719 330000 Pending
Trunk
Old Hwy 80 Construct 50%
Trunk 2 in 2010;
18 4783 1343000
Balance in
three years
Woodside Int. 10-15 3844 766000 Pending
1
Winter 10-12 2365 585000 Pending
Gardens Trunk
Total Cost 12276400 5219000
48
Financing Capital Improvements
Lakeside SD finances the majority of capital improvements and facility upgrades with District
reserves and development connection fees. Grants and loans have seldom been used. A portion
of the annual operation and maintenance charges (i.e., annual sewer service charge) are set aside
in the reserve fund for future system maintenance. In cases where a pipeline must be replaced
due to age and condition but will also be enlarged to accommodate growth, financing will occur
through a combination of “replacement reserve” and “expansion reserve” funds which are
retained in separate fund accounts. This is discussed further in Section II (5), Fiscal Review.
Although not an actual “capital improvement,” consideration must also be given to the financing
of future “Metro Capacity” costs. The cost per gallon of Metro capacity has increased
significantly in recent years, and any additional capacity needed will likely cause impacts to
District finances. Establishment of a separate “Metro capacity purchase fund” should be
considered to ensure adequate funds would be set aside for Metro capacity purchases when
needed. Inclusion as a separate “line item” in the expansion reserve budget might be another
option.
One of the conditions of the proposed “San Diego County Sanitation District” would be that CIP
reserve funds accumulated by each district as of the effective date of the reorganization would be
spent on identified CIP programs that benefit that district, until exhausted.
Conclusion
Planning for future facilities and infrastructure in the Lakeside SD is guided through the ten year
Facility Plan review/update process and the County General Plan. Based on review of the
Lakeside SD planning and CIP documentation, it appears District sewerage facilities are in
reasonably good condition with problems areas identified and programmed for
replacement/upgrade through the facility planning process. Future growth will continue in the
District as noted in the Facility Plan and General Plan Update reviews. Purchase of additional
Metro capacity may become necessary in the future.
Alpine Sanitation District
In 2002, a Facility Plan Study was completed for the Alpine Sanitation District by the consulting
firm of RBF Engineers. The study area included the Alpine SD, sphere of influence and the
Country Town Boundary area. The Alpine SD consists of a collection system and major pump
station facility located in Galloway Valley. Wastewaters are conveyed downstream through the
Lakeside system and into Metro for treatment and ocean disposal. The District’s current Metro
contract capacity is 0.7 mgd. The Alpine SD Facility Plan addresses existing and future
conditions in the District and presents an improvement/replacement program designed to
maintain and (where required) expand system service to meet future needs.
49
The County is in the process of updating the Sewer Master Plan for the Alpine Sanitation
District.
General Plan and Population Projections
During preparation of the Alpine SD Facility Plan in 2001/2002, General Plan Update final land
use allocations had not been determined by the Board of Supervisors. This required use of
existing County General Plan land use designations combined with SANDAG/County population
forecast. After General Plan Update population projections and land use allocation maps became
available (August 2006), the new data was incorporated into this report. No significant service
delivery issues were identified when compared with the earlier data.
The Alpine SD area was first divided into basins and sub-basins. Flow factors were then
developed. The County uses a flow rate of 240 gallons of wastewater discharge per day, per
single family dwelling unit (i.e., 1 EDU). The assumed household population is approximately
2.8 persons per unit. Existing and projected land uses and corresponding population levels are
then fed into hydraulic models that determine where future system improvements/expansion will
be required. This process begins at the sub-basin level and is repeated throughout the district and
sphere areas. Tables 7 and 8 summarize Alpine SD population and EDU flow projection
information:
Table 7
Existing and Future Population
Year 2000 EDU Equivalent Year 2020 EDU Equivalent
4000 1428 5800 2100
Does not include commercial EDUs
Table 8
Existing and Projected Wastewater Flows
Million Gallons Per Day (MGD)*
2000 2005 2010 2020
0.5 0.75 0.95 1.5
* Includes residential and commercial flows
Planned Capital Improvements
The Alpine Facility Plan includes a projected five year capital improvement program to meet
future District needs. Improvements consist of various pipeline replacements and upgrades due
to age and condition. New or enlarged facilities to accommodate future demand are also
50
recommended. A list of CIP projects and suggested completion schedule is included in Table 9.
Upgrades include three trunk sewer projects with an estimated cost of $1,368,500.
Table 9
Recommended Capital Improvement Program
Name Diameter Length Year 2005 CostYear 2010 Cost Status
Alpine Trunk 1 12 2233 508500 Preliminary
Engineering
Phase
Alpine Trunk 2 12-18 2813 750000 Pending
Alpine Trunk 3 15-18 344 110000 Pending
Total Cost 1368500
Since the 2007 MSR/SOI, the Flynn Springs Interceptor 1, a 15-inch diameter facility proposed
to be extended over 4,300 feet, has been added to the CIP Program. This $2.2 million project is
in currently in the design phase.
The proposed “San Diego County Sanitation District Reorganization”would be conditioned to
use available funds from the Alpine Sanitation District account for these or other comparable
facilities.
Financing Capital Improvements
Alpine SD finances the majority of capital improvements and facility upgrades with District
reserves and development connection fees. Grants and loans are seldom used. A portion of the
annual operation and maintenance charges (i.e., annual sewer service charge) is set aside in the
reserve fund for future system maintenance. In cases where a pipeline must be replaced due to
age and condition, but will also be enlarged to accommodate growth, financing will occur
through a combination of “replacement reserve” and “expansion reserve” funds which are
retained in separate fund accounts. This is discussed further in Section II (5), Fiscal Review.
Although not an actual “capital improvement”, consideration must also be given to the financing
of future “Metro Capacity” costs. The cost per gallon of Metro capacity has increased
significantly in recent years, and any additional capacity needed will likely cause impacts to
District finances. Establishment of a separate “Metro capacity purchase fund” should be
considered to ensure adequate funds would be set aside for Metro capacity purchases when
needed. Inclusion as a separate “line item” in the expansion reserve budget might be another
option.
51
Conclusion
Planning for future facilities and infrastructure in the Alpine SD is guided through the ten year
Facility Plan review/update process and the County General Plan. Based on review of the Alpine
SD planning and CIP documentation, it appears District sewerage facilities are in reasonably
good condition with problems areas identified and programmed for replacement/upgrade through
the facility planning process. Future growth will continue in the District as noted in the Facility
Plan and General Plan Update reviews. Purchase of additional Metro capacity may become
necessary in the future.
Julian Sanitation District
There are no regularly scheduled facility plan reviews for the Julian SD. Due to the small size of
the District, new/replacement sewers occur on an as needed basis. As mentioned in Section II
(1), there is current moratorium on new sewer connections to the District and no plans for system
expansion. The District recently received a federal grant/loan from the Rural Development
Administration to complete wastewater treatment plant upgrades. These upgrades do not provide
any additional system capacity.
Pine Valley Sanitation District
There are no regularly scheduled facility plan reviews for the Pine Valley SD. Due to the small
size of the District, new/replacement sewers occur on an as needed basis. There are no plans at
this time for system expansion. The District does have some excess capacity to support a limited
number of new connections.
County Sanitation Districts - Emergency Planning
The County Public Works Department maintains an Emergency Response Plan for all
departmental operations, including support to the sanitation district operations. In emergency
situations, including pipeline and pump station disruptions, wastewater flows can usually be
temporarily diverted to other lines. All pump stations maintain emergency storage basins and
either have fixed or portable generators on hand. Early warning alarm systems are also
maintained at various locations.
Water Reclamation Planning
Water reclamation opportunities for the sanitation districts have been investigated on occasion in
years past, namely in Lakeside and Spring Valley. To date, no cost effective solutions to reuse of
wastewater at the local sanitation district level have been identified. The most promising option
appears to be an area-wide type approach in the 1) Upper San Diego River basin with Alpine,
Winter Gardens and Lakeside flows combined with an expanded Padre Dam MWD reclamation
system and/or 2) for Spring Valley Sanitation District Sweetwater River basin either expansion
of WRF Chapman facility of Otay Water District or participation in a planned sewage plant in
52
Chula Vista. Although not currently operating, the Harmony Grove Maintenance District is also
planned as a reclamation plant.
The Alpine and Lakeside Sanitation Districts, and the Padre Dam MWD, have continued
cooperative infrastructure planning efforts, and hopefully will identify more future opportunities
to expand water reclamation programs throughout the upper San Diego River basin. Presently,
water reclamation services are provided primarily to customers within the City of Santee. Padre
Dam’s reclamation system has continued to develop and the County has recently partnered with
them by enabling a portion of the sewage flows from Alpine Sanitation District, Lakeside
Sanitation District and the Winter Gardens Sewer Maintenance District to be diverted to Padre
Dam’s reclamation facility in Santee. As growth and development continues to require sewer
service throughout the basin, the potential to expand water reclamation activities should be
closely examined as an alternative to continued Metro treatment and disposal. This may help to
stabilize costs and provide a needed resource to partially offset imported water demand and
rising imported water costs.
The proposed “San Diego County Sanitation District” will be continuing the partnership with
Padre Dam Municipal Water District as well as assessing other water reclamation opportunities.
Conclusions
Review of the infrastructure facilities and plans for each of the sanitation districts has not
revealed any significant operational or planning deficiencies. Although the Julian SD treatment
facility is operating at capacity and new services have been curtailed, the County has adopted
policies and procedures to maintain current levels of service. Improved coordination on
population forecasting between land use and wastewater facility planners will help ensure sewer
service facilities are properly sized and timed to meet future demands. Purchase of additional
Metro capacity in the Lakeside and/or Alpine Sanitation Districts may become necessary at some
future date.
Septic disposal problem areas within or bordering individual sanitation districts are not routinely
reviewed or mapped for use in the facility planning process. Service extensions/annexations
resulting from septic failures are usually handled on a case-by-case basis. This results in
numerous individual annexation/concurrent sphere amendment applications presented to
LAFCO. Inclusion of this information in the planning process, and dissemination to property
owners, could help to bring about more collective annexation proposals and associated cost
reductions as well as better coordination of sewer extension facilities to septic system problem
areas.
Recent (GIS) mapping systems from the County’s Environmental Health Department
helpimprove data collection and analysis on septic system problem areas. Septic areas identified
53
through this process may be a useful tool for future master plan updates and sphere of influence
reviews. Such information might also help to encourage collective annexation proposals, thereby
reducing the LAFCO processing cost for individual applications. However, care must be taken
when analyzing GIS septic information to separate septic systems that cannot be repaired from
those being enlarged to accommodate remodeling projects and permits pulled to accomplish
septic repairs. Procedures should be investigated that might improve opportunity for
ratepayer/public review of long range district facility master and financing plans. These plans
are typically used for internal planning and budgeting purposes, and become an integral part of
the larger County Public Works Department program and budget.
Public outreach on individual district matters are generally limited to brief issue oriented
discussions before community interest groups (e.g. rate increase, maintenance issues). More
direct forms of public involvement and review of district master planning activities appear
limited. Website improvements that focus more directly on individual district plans and
programs might be helpful. Other outreach approaches are also possible.
Adoption of General Plan Update will result in improved coordination between land use and
wastewater facility planning responsibilities through use of consistent land use and population
forecast.
3. Spheres of Influence Analysis and Recommendations
In accordance with State Law, each LAFCO is obligated to develop and adopt spheres of
influence for each city and special district in the county. A sphere of influence is defined as a
plan for the probable physical boundaries and service area of a local government agency as
determined by the Commission. Spheres are characterized as planning tools used to provide
guidance for individual proposals involving jurisdictional changes, and are intended to encourage
efficient provision of organized community services and prevent duplication of service delivery.
Spheres may be amended periodically; recent State Law directs that they be reviewed every five
years, as necessary.
Appropriate Boundaries
The boundaries of local governments should define territory where agencies can logically
provide service(s). Accordingly, spheres of influence should be adopted to identify areas where a
determination can be made that the agency will be prepared to provide efficient service(s) in the
future. Including territory in an agency’s boundary that cannot logically be served or, conversely,
excluding territory that can logically be served can cause inefficiencies and indicate that a
boundary adjustment is appropriate.
54
In addition, local agencies generally should avoid providing service(s) outside of their
boundaries because that type of service arrangement may introduce complexity into regional
service delivery and strain an agency’s infrastructure system. The Lakeside and Alpine sanitation
districts provide limited extra-territorial services. These services were implemented several years
ago prior to changes in State law which now provide for LAFCO review of such agreements.
There have been no further outside services provided since that time.
Spring Valley Sanitation District
The SVSD sewer system is shared by other agencies that were previously discussed in Section II
(1), Area and Agency Descriptions. Included in the LAFCO Southern San Diego County Water
and Sewer Municipal Service Review report, adopted February 2, 2004, was a discussion that
sphere of influence updates be completed by the SVSD and City of Chula Vista that would focus
on the most appropriate method to provide sewer service to the remaining portions of the Otay
Ranch development (Village 13). This will require joint participation by the City of Chula Vista,
SVSD and the Otay Water District.
While some preliminary discussions have occurred among the affected agencies, there has been
no further initiative on this matter by Chula Vista, Otay or the SVSD. Preliminary studies are in
progress by the developer to determine cost and feasibility of alternative route locations. After
these studies are completed agency officials should proceed with the sphere review.
During the 2007 MSR/SOI hearing, the San Diego LAFCO did not ultimately identify a need for
a Special Study Area for Otay Ranch. Since 2007, the City of Chula Vista has been working with
the developer on a service agreement. In response, the proposed “San Diego County Sanitation
District is not requesting that a Special Study Area be designated for Otay Ranch Village 13.
As previously discussed, the Spring Valley Sanitation District sphere of influence would be
modified to reflect the proposed sphere of the “San Diego County Sanitation District.”
Lakeside Sanitation District
The Lakeside SD sphere boundary borders the Padre Dam MWD and Winter Gardens Sewer
Maintenance District on the west, and the City of El Cajon to the south. These agencies each
provide sewage collection/treatment services. Recently a district boundary adjustment was
processed by LAFCO which involves the modification of sewer service responsibilities between
Padre Dam and the Lakeside SD. The High Meadow Ranch development area was originally to
receive sewer service by contractual service agreement since it was outside the boundaries of the
Lakeside Sanitation District. The territory has been annexed to the district subsequent to the
prepartion of the 2007 MSR/SOI study. Some additional areas to the north and east are
55
unconstrained by other sewer service boundaries and sphere inclusion inquiries have occurred
from a few local property owners (Alpine SD is approximately 12 miles east). These areas will
be reviewed further to determine final conformance withGeneral Plan Update goals and
objectives prior to annexation consideration, but for planning purposes seem appropriate for
inclusion in the Lakeside sphere.
As part of the proposed “San Diego County Sanitation District”, the Lakeside Sanitation District
would receive a zero sphere of influence signifying the service responsibilities of the district
should be transferred to the combined district. The territory within the Lakeside Sanitation
District should become part of the proposed sphere of influence of the “San Diego County
Sanitation District”. Neither an expansion or modification to delete territory from the 2007
sphere is being proposed.
Alpine Sanitation District
The Alpine SD sphere boundary is not contiguous to any other nearby sewer service agency. As
previously mentioned, Alpine maintains two contractual service agreements consisting of a
residential neighborhood and two middle schools. These areas should be considered for inclusion
in the sphere boundary (See Figure 28). The limiting constraints to further boundary changes are
sewage capacity, topography, and surrounding public and tribal lands. Boundary adjustments
shall be reviewed in conformance with General Plan Update goals to determine Alpine SD’s
appropriate sphere of influence.
As part of the proposed “San Diego County Sanitation District”, the Alpine Sanitation District
would receive a zero sphere of influence signifying the service responsibilities of the district
should be transferred to the combined district. The territory within the Alpine Sanitation District
should become part of the proposed sphere of influence of the “San Diego County Sanitation
District”. Neither an expansion or modification to delete territory from the 2007 sphere is being
proposed.
Julian Sanitation District
The Julian SD boundary is not anticipated to change in the foreseeable future due to the sewer
moratorium and limitations imposed by Board Policy I-113. Therefore, no change in the existing
Julian SD coterminous district/sphere boundary is recommended at this time.
As part of the proposed “San Diego County Sanitation District”, the Julian Sanitation District
would receive a zero sphere of influence signifying the service responsibilities of the district
should be transferred to the combined district. The territory within the Julian Sanitation District
should become part of the proposed sphere of influence of the “San Diego County Sanitation
56
District”. Neither an expansion or modification to delete territory from the 2007 sphere is being
proposed.
Pine Valley Sanitation District
The Pine Valley SD sphere boundary is not contiguous to any other nearby sewer service agency.
The district sphere/boundary should be adjusted to include the County park/library site which is
currently served by sewer service agreement, and the elementary school site currently served by
on-site septic system. Consideration should be given to designating portions of the “meadow
area” as a Special Review Area. Depending on the outcome of the General Plan Update land
use allocations for the Pine Valley area, and completion of groundwater studies, this area might
apply for a future sphere amendment and district annexation (See Figure 31).
As part of the proposed “San Diego County Sanitation District”, the Pine Valley Sanitation
District would receive a zero sphere of influence signifying the service responsibilities of the
district should be transferred to the combined district. The territory within the Pine Valley
Sanitation District should become part of the proposed sphere of influence of the “San Diego
County Sanitation District”. The existing Special Study Area for the “meadow” will be retained.
Neither an expansion or modification to delete territory from the 2007 sphere is being proposed.
Agreements and Policies
As discussed in Section II (1), Area and Agency Descriptions, the Board of Supervisors has
adopted various policies which address sewer service issues in unincorporated areas of the
County. Policy I-106 was adopted to establish priorities for allocating limited capacity in the
East Mission Gorge Outfall System, which is owned by the City of San Diego. County agencies
that utilize the Mission Gorge Outfall are the Lakeside SD, Alpine SD, and the Winter Gardens
Sewer Maintenance District. Terms and conditions for use of this facility are contained in the
Sixth Amendment to the Sewage Disposal Agreement, Between the City of San Diego and the
Alpine and Lakeside Sanitation Districts. The Padre Dam MWD and the City of El Cajon also
utilize this facility through separate agreements.
Now that the Mission Gorge pump station, force main and trunk sewer line have sufficient
capacity for projected buildout of the adopted County General Plan, Policy I-106 criteria are no
longer applicable. The policy will be likely be reviewed in conjunciton with the General Plan
Update. Fair share contributions for agencies utilizing the Mission Gorge upgrades are being
addressed.
For Alpine SD, new applications for annexation can only be accepted if the property is within the
Alpine Country Town Boundary, unless a finding can be made that annexation would provide a
57
needed public facility, such as a school, fire station, or library. Exception criteria that can be
applied to both Lakeside SD and Alpine SD include sewer extensions necessary for health and
safety reasons, and for properties with failed septic systems, as verified by the County
Department of Environmental Health.
The Board of Supervisors adopted Policy I-107 in 1986 to address the long-term availability of
sewer service and to encourage infilling within certain portions of East County – primarily areas
served by the Spring Valley SD. The policy generally prevents the installation of sewers from the
Rancho San Diego Sewer Interceptor to areas not within the Urban Limit Line. Failing septic
systems and public health and safety situations are excluded from this restriction. The policy also
prohibits the SVSD from entering into contractual service agreements with private property
owners. This policy is still in effect and will be reviewed for continuance by December 31, 2012.
As mentioned, above this policy should be included as part of a comprehensive sewer policy
review under the General Plan Update process.
Policy I-113 is used to regulate sewage connections to the Julian Sanitation District due to
capacity limits at the treatment plant. In essence, this policy is used as an enforcement tool to
implement a moratorium on new connections to the system (with limited exceptions).
Determination of Sphere of Influence Boundaries – Review Criteria
Sphere of influence boundaries for the County sanitation districts are determined based on
review criteria which include such factors as general plans and population growth, drainage
areas, availability and condition of wastewater facilities, avoidance of district “service islands,”
and existing or potential septic disposal problem areas. Specific review criteria are listed below:
1. Existing and Proposed General Plans
The existing County General Plan and the proposed General Plan Update community
land use plans and target population projections were evaluated in relation to existing
sphere boundaries. The current sphere boundaries are based on the existing general plan;
therefore, areas planned for new development, or increased development, were compared
against proposed General Plan Update recommended land use allocations. While it is
important to mention that General Plan Update has yet to be officially adopted by the
Board of Supervisors, it nevertheless still serves as an important planning tool in
development of appropriate sphere boundaries.
To the extent possible, the objective is to honor the spirit and intent of the General Plan
Update process, while at the same time recognizing the LAFCO legislative mandate to
complete the sphere review and update program by January 1, 2008. In the event adopted
General Plan Update land uses and densities should be found to be in conflict with
portions of the updated sphere boundaries, LAFCO will revise those areas to ensure
interagency planning and service delivery coordination.
58
2. Housing Density Determinations
The analysis of existing and proposed general plan General Plan Update has utilized a
factor of two dwelling units per acre, or greater, as the determining density factor for
sewer service sphere boundary review. In some cases, a factor of one dwelling unit per
acre is used where topography and soil conditions suggest sewer service would be
warranted, or if such areas were already located within a sphere boundary.
3. Drainage Basins
Sewer collection, transmission, treatment and disposal facilities are usually designed to
flow under gravity conditions, which reduces the need for pumping facilities that are
costly to operate and maintain. Pumping facilities are also a frequent source of sewage
spills when they malfunction or fail. For this reason, many sewer district boundaries
generally follow drainage basin topography and watershed boundaries.
While there are exceptions to this design principle, the sphere boundaries identified for
the sanitation districts are based along watersheds and sub-drainage basin areas.
Exceptions occur when developed or developing areas (or areas with septic failures)
located in adjacent basins have no alternative service provider, or the provider (e.g., city)
will not provide the service. [For example, State law and LAFCO require annexation to a
city for sewer service provision rather than having the city deliver a single service
extension].
4. Facility Condition and Availability
System condition and availability of capacity are the most important component of a
district’s ability to provide service extensions. The sanitation district facility master plans
are the primary tool used to assess facility adequacy and available capacity.
5. Avoidance of Island Creation
The creation of “service islands” is inconsistent with the objective of facilitating uniform
service area boundaries, and every effort has been made to avoid this condition in the
sphere review process. Exceptions occur when unforeseen septic failures require
annexations which result in creation of island boundaries that were not part of the sphere
planning process.
6. Potential Septic Failure Areas
Known or potential septic problem areas identified from LAFCO records and the
County’s Department of Environmental Health have been included in the proposed
sphere. It should be noted the 2007 MSR/SOI used the term “septic failure” in the
broadest sense. Many of the homes in the identified areas are able to repair their septic
59
systems rather than being forced to connect to a public sewer system. The Department of
Environmental Health does require that septic systems within 200 feet of an existing
sewer line be connected to a public sewer system.
7. Sphere Amendment Activity
Areas or sub-areas within sanitation districts that have experienced a disproportionate
amount of sphere amendment activity have been included in the proposed sphere to
establish logical boundaries.
8. Contractual Service Agreements
Where appropriate, contractual service agreement areas have been included in a sphere
boundary, but no expansion of such areas, or establishment of new contractual service
agreement areas, are identified.
9. Special Review/Study Areas
In some instances insufficient information was available to determine if certain areas
were appropriate for inclusion in a sphere. In such cases, these areas have been identified
as Special Review/Study Areas. Upon completion of further investigations, inclusion in
the sphere could be considered by LAFCO in the future.
Summary of Sphere Amendments for the Sanitation Districts
Figure 37 show a summary of sphere amendment activity for the sanitation districts dating back
to 1985. The sections which follow include brief discussions of sphere amendment activity for
each of the districts, and recommendations for sphere amendment where appropriate.
Request for Sphere Inclusion
Figure 38 shows the location of various annexation inquiries that have been received by LAFCO
for the Spring Valley, Lakeside, Alpine and Pine Valley Sanitation Districts (no inclusion
inquiries were received for the Julian SD). These inquiries will be reviewed further in the
following sections.
Spring Valley Sanitation District - Sphere of Influence Status (1983-2004)
LAFCO originally adopted a partial sphere of influence for the Spring Valley SD in 1983
focusing on the communities of Spring Valley, La Presa and Casa de Oro. In 1983, the SVSD
included 15 square miles (9,600 acres). The original sphere included approximately 15 square
miles outside of the boundaries of the District. The majority of the additional territory was
located within the sewer improvement districts of the Otay Water District and was either
receiving service, or authorized to receive service from Otay. Otay’s sewer service areas already
60
receive service indirectly from SVSD through a connection agreement. This area is within the
current urban development area of the Valle de Oro Community Plan.
In 1985, LAFCO evaluated the balance of the Spring Valley SD in the unincorporated
communities of Lincoln Acres, Bonita and Sunnyside. Facilities were considered adequate and
no new major improvements were anticipated in these areas. The 1985 sphere report indicated
that septic systems were widely used throughout the three communities and that a higher rate of
septic system failure was present in the Bonita and Sunnyside areas. Because the Lincoln Acres,
Bonita and Sunnyside communities were included in the spheres for the neighboring cities
(National City and Chula Vista), these communities were not included in the SVSD sphere.
To avoid an overlap of service responsibility, LAFCO typically detaches territory from a district
in conjunction with annexation to a city. However, to annex into a city, property must be
contiguous to the city boundary. The unincorporated communities of Bonita and Lincoln Acres
were excluded from the SVSD sphere of influence because they were included in the spheres for
the City of Chula Vista and National City respectively. For property in either or those cities’
sphere that is not eligible for a municipal annexation, the Commission adopted a policy allowing
annexation to SVSD of territory outside the sphere without processing a concurrent sphere
amendment.
In 1983, the population of the District was approximately 70,000 people. The 1981-82 average
daily sewage flow was 5.4 mgd. The year 2000 population for SVSD was approximately 85,000,
an increase of 15,000 from 1983. The SVSD population is projected to grow by an additional
40,000 residents beyond the year 2020. SVSD Metro capacity rights total 10.35 mgd, with
current average daily flows of approximately 7.7 mgd. Therefore, 2.7 mgd of unused SVSD
Metro capacity remains available for future use. This equates to about 11,250 EDUs, or an
equivalent population of approximately 34,000. Based on this review, it appears SVSD will have
sufficient Metro capacity to accommodate projected future demands.
In 2004, the Wastewater Management Section of the County Public Works Department reported
that SVSD is 20 square miles in area (12,876 acres) with approximately 26 square miles (16,600
acres) remaining within its sphere. Sewer service is provided to a total of 22,488 customer
accounts served by approximately 219 miles of collection sewers. The current number of EDUs
served within the Spring Valley SD is approximately 32,000.
Additional flows enter the SVSD system from Chula Vista (12,500 EDUs), Lemon Grove (1,545
EDUs), La Mesa (2,712 EDUs), Otay Municipal Water District (2,500 EDUs), and the City of
San Diego (8,000 EDUs). Therefore, a total of approximately 59,257 EDUs flows through the
SVSD system to Metro. These combined agency flows equate to an average total Metro
discharge of between 13.5 – 14.0 mgd. Ultimate flows (beyond 2020) from all contributing
agencies are anticipated to reach approximately 21.0 mgd.
61
2005 Sphere of Influence Review
Since 1985, LAFCO has amended the Spring Valley SD sphere of influence seventeen times
adding approximately 36 acres to the sphere. Since 2007, two minor sphere of influence
amendments have been approved which total less than one acre. No territory has been removed.
Combined, the SVSD and sphere of influence covers an area of approximately 29.2 square miles
( 18,688 acres).
In 2004, LAFCO staff requested the Wastewater Management Section of the County Public
Works Department to identify areas that may need district services due to septic failure or
proposed development. County staff did identify potential development projects, but were not
able to identify areas with the potential for septic failure. Therefore, the LAFCO database
together with information obtained from the County Departmental of Environmental Health was
used to identify potential septic failure areas. Existing or potential septic problem areas are
shown on Figure 39 . It should be noted that septic tank failures may be corrected and service by
a public sewer system is often not required unless the property is within 200 feet of an existing
public sewer line.
Sphere Inclusion Inquiries
Five inquiries have been received by LAFCO for sphere inclusion within the SVSD. Four
inquiries appear related to potential septic problems in the unincorporated area bordering the
City of La Mesa, but outside the La Mesa sphere. Further site specific investigations would be
required to determine the appropriate sewer service authority and corresponding sphere boundary
for this area. The fifth inquiry involved a potential sphere amendment/annexation request from
the Sweetwater Authority to provide sewer service for a portion of property containing its water
treatment operations complex at Sweetwater Reservoir. To date the Sweetwater Authority has
not pursued this matter further. None of the inquiries referenced in the 2007 MSR/SOI are being
formally pursued.
Recommended Sphere of Influence Boundary – Spring Valley Sanitation District
The Spring Valley SD sphere of influence should be modified to include properties that are of a
size that may merit sewer service (e.g., lots ½ ac. or less in size), or other properties with
boundaries that were inadvertently split by the existing sphere boundaries. Existing land use
plans and changes proposed under General Plan Update have also be considered in the sphere
boundary review process.
In general, the sphere boundary is intended to include those areas which are contiguous to the
existing district and sphere boundary which are designated for residential land use densities of
two dwelling units per acre or greater. Commercial, industrial and public lands are also included
where appropriate. The sphere of influence is intended as a general planning boundary for
62
potential future sewer service, not as a precise sewer service area. Annexation of territory within
the sphere will occur at the project level review phase.
Recommended Sphere of Influence (2010 Amendment)-Spring Valley Sanitation District
Combining nine districts into one would require that LAFCO concurrently adjust the 2007
adopted spheres of influence for the five county sanitation districts. The three sewer
maintenance districts and one water and sewer maintenance district, because they are not subject
to LAFCO, have service area boundaries but not adopted sphere of influence boundaries.
As illustrated on Figure 40, the sphere of influence for the Spring Valley Sanitation District (to
be re-named the San Diego County Sanitation District) would now include:
• The territory included within the adopted Sphere of Influence of the Spring Valley Sanitation
District,
• The territory included within the adopted Sphere of Influence of the Alpine Sanitation District,
• The territory included within the adopted Sphere of Influence of the Lakeside Sanitation
District,
• The territory included within the adopted Sphere of Influence of the Julian Sanitation District,
• The territory included within the adopted Sphere of Influence of the Pine Valley Sanitation
District,
• The territory included within the service area of the Winter Gardens Sewer Maintenance
District,
• The territory included within the service area of the East Otay Mesa Sewer Maintenance
District,
• The territory included within the service area of the Harmony Grove Maintenance District, and
• The territory included within the service area of the Campo Water and Sewer Maintenance
District.
The sphere should continue to reflect the Special Review/Study Areas established by LAFCO in
2007 for the Lakeside Sanitation District and Pine Valley Sanitation District.
Lakeside Sanitation District - Sphere of Influence Status (1985-2004)
LAFCO adopted the original sphere of influence for the Lakeside SD in 1985 when the District
included 4,500 acres. The adopted sphere added approximately 1,600 acres of territory outside
the District boundary, consisting primarily of in-fill areas surrounded by the District and some
adjoining development areas that were still subject to final County approval (e.g., High Meadow
Ranch).
LAFCO also considered a substantially larger sphere for the Lakeside SD proposed by the
County. The County’s sphere proposal envisioned increasing the Lakeside SD from 4,500 acres
to 12,000 acres. This proposal was not approved by LAFCO due to concerns over available
sewer capacity and unknown growth inducing effects.
63
2005 Sphere of Influence Review
Since 1985, LAFCO has amended the Lakeside SD sphere of influence 20 times resulting in the
inclusion of approximately 190 additional acres. Since the adoption of the 2007 MSR/SOI study,
one eight acre area has been added to the sphere. No territory has been removed.
In 2004, the Wastewater Management Section of the County Public Works Department reports
that there are 7.9 square miles (5,075 acres) acres within the Lakeside SD, and 9.9 square miles (
6,324 acres) remaining within its sphere. Service is provided to a total of 8,000 customer
accounts, by approximately 73 miles of collection sewers.
The current number of EDUs served by the Lakeside SD, including EDUs attributable to
jurisdictions that maintain connection agreements with the District is 13,200. The maximum
projected EDU capacity that could be accommodated within all basins of the current Lakeside
SD system is slightly over 20,000 EDUs. In 2004, LAFCO staff requested the Wastewater
Management Section of the County Public Works Department to identify areas which may
require district services due to septic failure or proposed development. County staff did identify
potential development projects, but did not identify areas with the potential for septic failure.
Therefore, the LAFCO database together with information obtained from the County Department
of Environmental Health was utilized to identify potential septic failure areas. Existing or
potential septic problem areas are shown on Figure 41 .
Lakeside Sanitation District Boundary Adjustment Proposal
In early 2005, the Padre Dam Municipal Water District (Padre Dam) requested Lakeside SD
Board of Directors consent to the detachment of 6,195 acres of sewer service area from Padre
Dam, and concurrent annexation of this territory to the Lakeside Sanitation District. This
unincorporated area is located in the Upper San Diego River Sub-Basin and includes portions of
the Eucalyptus Hills and Morena Valley areas of Lakeside. The annexation is an important
component of a larger jurisdictional reorganization involving Padre Dam MWD, and Lakeside
and Riverview Water Districts.
Under this reorganization proposal Lakeside and Riverview detached territory from Padre Dam
and then merged in to single district (Lakeside Water). Lakeside purchases water directly from
San Diego County Water Authority and discontinued wholesale water purchases from Padre
Dam. The detachment of Padre Dam’s sewer service area in the unincorporated area and
concurrent annexation to Lakeside Sanitation District preserves existing sewer service
entitlements in the affected territory.
On May 18, 2005, the Lakeside SD Board of Directors passed a resolution consenting to the
annexation of territory to the sanitation district. The Board’s resolution consenting to annexation,
and Padre Dam’s Board resolution consenting to detachment, enabled LAFCO to complete the
reorganization expeditiously. As approved, The Lakeside SD increased by 6,195 acres to a total
of approximately 11,542 acres.
64
Sphere Inclusion Inquiries
Several property owners within the Lakeside area have expressed interest in sphere inclusion and
(possible) future annexation to the sanitation district (Figure 38 ).
The first area includes portions of the Upper San Diego River Improvement (USDRIP) Area
which is planned for residential, industrial and river park uses. This area, which exceeds 100
acres, could also be physically served by the Padre Dam MWD. However, due to district
reorganization proceedings mentioned above, Padre Dam’s sphere of influence will no longer
include this area. Therefore, it is appropriate to include USDRIP within the Lakeside SD sphere.
The next inquiry includes an industrially planned and zoned area exceeding 20 acres located west
of Highway 67 and north of central Lakeside. Sewer facilities are located in a nearby industrial
park and have potential to be accessed from other properties in the area. The recommended
sphere for the northern portions of the sanitation district includes consolidating the existing non-
contiguous sphere areas into a more logical planning area. This expanded area includes the
subject property. Another inquiry involves a minor infill adjustment in the Mapleview/Vine
Street area within the town center.
Additional inquiries have been received regarding eastern portions of the district along the
Interstate 8 corridor. One inquiry involves a 90-acre parcel which adjoins Flynn Springs County
Park. At the time of the request (January 2005), the subject property was undergoing County
staff review for a boundary line adjustment. The owners propose to sell two 4-acre parcels and
develop the remaining parcel with a senior retirement housing facility, and an assisted living
complex. General Plan Update proposes to designate this area for low density residential uses
not requiring sewer service. Although it is possible to obtain variances that would allow for
clustering within low density areas, there is insufficient information at this time to support
inclusion of planned low density development areas in the updated Lakeside sphere boundary.
The site will instead be recommended for designation as a Special Review Area in accordance
with the Sphere of Influence Review Criteria and may be considered for sphere inclusion at a
later time.
The next inquiry concerns an area of approximately 2.0 acres. The site is near commercial,
medium and lower residential uses. It also borders the existing Lakeside SD sphere boundary.
General Plan Update plan objectives for this area indicate up to four dwellings units per acre
which would require sewer service from the Lakeside SD. This site is recommended for
inclusion in the Lakeside SD sphere.
The final Lakeside SD sphere inquiry concerns the proposed Crestlake Development Project,
located in the Crest, Dehesa, and Harbinson Canyon CPA. The project proposes to construct 62
residential units on approximately 70 acres with the remainder (about 220 acres) set aside as
permanent open space. On December 10, 2003 the developer obtained Board of Supervisor
approval to waive Policy I-106 from this project. The site lies within the San Diego River
watershed with gravity drainage to the Lakeside SD system in the vicinity of Interstate 8 and the
65
Los Coches Trunk Sewer system. This area was not included within either the Lakeside SD or
the Alpine SD facility plan update process (see Section II-2). The site also adjoins the 2,000 acre
Crestridge Land Conservation Bank. This site is appropriate for designation as a Special Review
Area. An updated review of the Lakeside facility plan to ensure mitigation of any project impacts
should be completed prior to inclusion in the sphere, and initiation of formal annexation
proceedings.
In 2007, the territory included in the proposed Crestlake development project was designated as
a Special Study Area. As of the date of preparation of this MSR/SOI Amendment, a proposal to
annex the territory to the Lakeside Sanitation District is pending before LAFCO. As a condition
of the proposed “San Diego County Sanitation District Reorganization”, the combined district
would become responsible for annexation, assuming LAFCO approval.
Recommended Sphere of Influence Boundary – Lakeside Sanitation District
The Lakeside SD sphere of influence should be modified to include properties that are of a size
that may merit sewer service (e.g., lots ½ ac. or less in size), or other properties with boundaries
that were inadvertently split by the existing sphere boundaries. Existing land use plans and
changes proposed under General Plan Update must also be considered in the sphere boundary
review process.
In general, the sphere boundary is intended to include those areas which are contiguous to the
existing district and sphere boundary which are designated for residential land use densities of
two dwelling units per acre or greater. Commercial, industrial and public lands are also included
where appropriate. The sphere of influence is intended as a general planning boundary for
potential future sewer service, not as a precise sewer service area. Annexation of territory within
the sphere will occur at the project level review phase.
Recommended Sphere of Influence (2010 Amendment)-Lakeside Sanitation District
One of the proposed actions of the “San Diego County Sanitation Services Reorganization”
would dissolve the Lakeside Sanitation District and annex the territory of the district to the
Spring Valley Sanitation District. In February, 2010, the Lakeside Sanitation District provided
consent for the dissolution and adoption of a zero sphere of influence contingent on approval of
the reorganization proposal. The territory within the sphere of influence and designated special
study areas of the Lakeside Sanitation District are proposed to be included within the the Spring
Valley Sanitation District (to be renamed the San Diego County Sanitation District). The
territory included as a Special Study Area in 2007 will be retained. Figure 42 illustrates the
recommended zero sphere of influence for the Lakeside Sanitation District.
66
Alpine Sanitation District - Sphere of Influence Status (1983-2004)
LAFCO originally adopted the sphere of influence for the Alpine SD in 1983. In 1983, the
Alpine Sanitation District consisted of approximately 616 acres (about 1 square mile), and
included approximately 1.8 square miles (1,200 acres) within the surrounding sphere boundary.
This area consists of existing developed areas with potential for septic problems and developing
industrial areas north of Interstate 8. The adopted sphere includes the more developed portions of
the Country Town Boundary. In 1983, the population of the District was 3,500 (284 service
connections representing 1,140 EDUs).
2005 Sphere of Influence Review
Since 1983, LAFCO has amended the Alpine SD sphere of influence once which added 238
acres to the sphere boundary (i.e., Crown Hills development). No territory has been removed.
In 2004, the Wastewater Management Section of the County Public Works Department reports
that there are 1.4 square miles (900 acres) within the Alpine SD, and 3.3 square miles (1,200
acres) within the sphere boundary. Service is provided to 1,300 customer accounts by
approximately 21 miles of collection sewers. Current (2004) District population is estimated to
be 5,000. The current number of EDUs served by the Alpine SD is 2,500 and 47 EDUs are
committed to potential customers. The maximum projected EDU capacity that could be
accommodated within all basins of the current Alpine SD system is 4,230 EDUs based on
average usage of 169 gallons per day.
In 2004, LAFCO staff requested the Wastewater Management Section of the County Public
Works Department to identify areas which may require district services due to septic failure or
proposed development. County staff identified potential development projects, but did not
identify areas with the potential for septic failure. Therefore, the LAFCO database together with
information obtained from the County Department of Environmental Health was utilized to
identify potential septic failure areas. Existing or potential septic problem areas are shown on
Figure 43.
The Harbinson Canyon residential area, located outside the district but served by a contractual
service agreement, is included in the Alpine SD sphere boundary.
Sphere Inclusion Inquiries
Five inquiries for sphere inclusion have been received by LAFCO. The first concerns an area of
approximately 50 acres in the southeastern portion of Alpine near South Grade Road. The area is
proposed to be designated as Village Residential (1 dwelling unit per 2 – 2.9 acres) under
General Plan Update, which would require sewer service from the Alpine SD. The area appears
to be appropriate for inclusion in the recommended sphere boundary.
67
The second area consists of approximately 15 acres and is located in the northwest portion of
Alpine near Tavern Road. It is currently recommended for a Village Residential designation
(14.5 dwelling units per acre) and is surrounded by the existing sphere boundary. This area is
also recommended for inclusion in the Alpine SD sphere.
The third site covers approximately 5 acres located adjacent to Tavern Road south of Alpine
Blvd. This area is also planned for Village Residential (10.9 – 14.5 dwelling units per acre) and
would be appropriate for inclusion in the Alpine SD sphere.
The final two sites are small lots located in the western portion of Alpine near Arnold Way. This
general area does have a history of septic problems; however, it is not considered to be of a
significance that would necessitate extension of sewer service. The area is planned for low
density residential uses, which will not require sewer service. Sphere inclusion is not
recommended at this time.
The status of the referenced sphere inquiries has not changed and no further inquiries have been
made.
Recommended Sphere of Influence Boundary – Alpine Sanitation District
The Alpine SD sphere of influence was modified in 2007 to include properties that are of a size
that may merit sewer service (e.g., lots ½ ac. or less in size), and other properties with
boundaries that were inadvertently split by the existing sphere boundaries. Land use changes
proposed under GP General Plan Update have also been considered in the sphere boundary
review process.
In general, the sphere boundary is intended to include those areas which are contiguous to the
existing district and sphere boundary which are designated for residential land use densities of
two dwelling units per acre or greater. Commercial, industrial and public lands are included
where appropriate. Additionally, the Harbinson Canyon residential area, located outside the
district but served by contractual service agreement, is also recommended for inclusion in the
Alpine SD sphere boundary.
The sphere of influence is intended as a general planning boundary for potential future sewer
service, not as a precise sewer service area. Annexation of territory within the sphere will occur
at the project level review phase.
Recommended Sphere of Influence (2010 Amendment)-Alpine Sanitation District
One of the proposed actions of the “San Diego County Sanitation Services Reorganization”
would dissolve the Alpine Sanitation District and annex the territory of the district to the Spring
Valley Sanitation District. In February 2010, the Alpine Sanitation District provided consent for
68
the dissolution and adoption of a zero sphere of influence contingent on approval of the
reorganization proposal. The territory within the sphere of influence of the Alpine Sanitation
District is proposed to be included in the Spring Valley Sanitation District (to be re-named as the
San Diego County Sanitation District). Figure 44 illustrates the recommended zero sphere of
influence for the Alpine Sanitation District.
Julian Sanitation District - Sphere of Influence Status (1988-2004)
LAFCO originally adopted a sphere of influence for the Julian SD in 1988. In 1988, the Julian
SD included approximately 80 acres. The adopted sphere included approximately 100 acres
beyond existing District boundaries. The sphere territory included the Julian Pines area, an
existing subdivision with parcel sizes generally at maximum allowable densities under the Julian
Historic Plan. The area is subject to potential septic failures.
As of 1988, the sanitation district owned and maintained approximately 2.5 miles of sewer mains
and a sewage treatment facility. As of 2004, the sewer collection system now includes
approximately 2.8 miles of sewer pipe, primarily as a result of annexation of the Julian
middle/high schools. The collection system conveys sewage to the treatment facility, located
approximately one mile west of the Julian Town center. The treatment facility provides
secondary treatment with effluent discharged by spray irrigation within the treatment plant site.
In 1988, the District was operating at about 72 percent of treatment plant capacity. Currently
(2004), the treatment plant operates at its maximum permitted capacity of 40,000 gallons per day
(0.040 mgd). All available sewer capacity has been committed. There are no plans to expand
treatment plant capacity in the foreseeable future due to lack of demand, funding and community
support. Accordingly, the Julian SD is under a sewer moratorium that limits and strictly controls
new sewer connections. New sewer permits in Julian are only issued under very strict criteria,
such as a failing septic system or to previously purchased sewer commitments as specified in
Board of Supervisor’s Policy I-113.
In 2004, the Wastewater Management Section of the County Public Works Department reported
that the Julian SD sewer system serves the Julian central business/residential district and the
nearby middle/high school area. The Julian SD is 0.19 square mile in size (119 acres). The
growth of the district was primarily due to the recent annexation of the middle/high school site
(approximately 32 acres), and the District’s population is approximately 750 with a total of 97
customer accounts. The average flow per connected EDU fluctuates between 79-125 gallons per
day (gpd). There are 315 EDUs presently served by the Julian SD (215 EDUs residential; 100
EDU’s commercial). The District has 11 EDUs committed to future customers not subject to
Policy I-113 restrictions. No additional areas have been identified for sewer service, including
areas potentially subject to septic failure.
69
Board Policy I-113
The Board of Supervisors enacted Board Policy I-113 in 1989 due to increasing occurrences of
high sewage inflows into the treatment plant - especially during periods of high tourist activity.
The resulting operational problems which this created would likely result in discharge violations
and penalties from the Regional Water Quality Control Board. Attempts were made to secure
grant funding to enlarge the plant in the mid 1990s, however those efforts were abandoned due to
the high cost of the project. In 2001, a grant/loan was obtained from the federal Rural
Development Administration to implement treatment plant upgrades. Although plant expansion
did not occur, system operating performance was improved and permitted discharge standards
have been maintained. These federally funded improvements did necessitate implementation of a
five-year phased customer rate increase. This was approved by the Board in 2001.
2005 Sphere of Influence Review
Since 1985, LAFCO has amended the Julian SD sphere of influence two times which included
47 additional acres. In addition to inclusion of the 32 acre Julian middle/high school area, 15
acres were added for the wastewater treatment plant site.
Recommended Sphere of Influence (2010 Amendment)-Julian Sanitation District
One of the proposed actions of the “San Diego County Sanitation Services Reorganization”
would dissolve the Julian Sanitation District and annex the territory of the district to the Spring
Valley Sanitation District. In February, 2010, the Julian Sanitation District provided consent for
the dissolution and adoption of a zero sphere of influence contingent on approval of the
reorganization proposal. The territory within the sphere of influence of the Julian Sanitation
District is proposed to be included in the Spring Valley Sanitation District (to be re-named as the
San Diego County Sanitation District). Figure 45 illustrates the recommended zero sphere of
influence for the Julian Sanitation District.
Pine Valley Sanitation District - Sphere of Influence Status (1988-2004)
LAFCO adopted a sphere of influence for the Pine Valley SD in 1994. The District includes
approximately 28 acres and has a coterminous sphere. The wastewater treatment plant site is not
contiguous with the major portion of the District, but is included in the sphere. Sewer plant
permitted treatment capacity is 40,000 gallons per day (0.4 mgd). Average daily flows in 1994
were approximately 8,000 gpd (.008 mgd). District customers consist of commercial and
residential users located along Old Hwy 80 in the village center area.
The Pine Valley SD sphere was originally considered by LAFCO in 1986, and an expanded
sphere was proposed by a private property interest containing an additional 290 acres beyond the
70
then 23+ acre district. The expanded sphere would have included territory accommodating
several proposed development projects, and expansion of the sewer treatment plant.
During the 1986 sphere hearing, Pine Valley residents expressed concern about potential
groundwater contamination from the proposed treatment plant expansion since the area is
completely dependent upon groundwater for domestic use. Residents wanted further information
regarding possible health effects from increases of treated effluent percolating into the
groundwater system. In response, the Commission deferred consideration of the proposed sphere
until the Regional Water Quality Control Board could conduct a thorough analysis of issues
involved with the expansion of the treatment plant.
Subsequent to Commission deferral of the Pine Valley SD sphere adoption, the proposed
development was suspended and the need for a sewage treatment plant expansion was no longer
necessary. As of 1994, the current treatment plant capacity was determined to be sufficient for
existing development, and the Commission adopted a coterminous sphere for the District. The
District consists of 48 customer accounts (mostly commercial establishments) serving a total of
96 EDUs. District residential population is approximately 150. The Pine Valley SD area still
remains about 28 acres in size. The treatment process is secondary treatment system using
aerated oxidation ponds. The treated effluent is disposed of through percolation and evaporation
in ponds adjacent to the facility. There are approximately 0.4 miles of collection sewers in the
District.
2005 Sphere of Influence Review
Since 1994, no sphere amendments have been adopted. In 2004, LAFCO staff requested the
Wastewater Management Section of the County Public Works Department to identify areas
which may require district services due to septic failure or proposed development. County staff
identified one 9-acre area adjacent to the northerly district boundary, referred to as the
“meadows”. A 20-unit subdivision has been proposed in this area and sewer service has been
requested. Extension of sewer service to the site would resolve concerns about potential drinking
water contamination from septic discharges into the groundwater system. The LAFCO database
together with information obtained from the County Department of Environmental Health was
utilized to identify other potential septic failure areas. Existing or potential septic problem areas
are shown on Figure 46 .
Treatment plant operations are sufficient to accommodate existing uses with capacity available
for additional connections. Wastewater generation in the District has remained generally stable,
but flows occasionally go down when there are extended commercial vacancies and reduced
business activity.
71
Sphere Inclusion Inquiries
As discussed above, the “meadows” area is presently vacant but a General Plan Amendment has
been proposed to allow for creation of 20 clustered lots on approximately nine acres. The site is
adjacent to the District boundary. This area was designated as a Special Review Area in 2007
due to the potential for a future annexation proposal. This will depend on completion of local
groundwater studies and adoption of General Plan Update land uses for the area.
Sphere of Influence Boundary – Pine Valley Sanitation District
The sphere of influence for the Pine Valley SD includes a small addition (approximately 5
acres) along the eastern edge of the district which is the present site of the existing elementary
school, and inclusion of the County park and library sites presently served by sewer service
agreement. Two small commercial parcels are also included which are currently served by septic
systems. The 9-acre meadows area is designated as a Special Review Area. Based on review of
the existing General Plan and General Plan Update goals, it appears there will be no further
demand for sewer service outside of the recommended sphere of influence area except for
possible septic failures, which would be processed through LAFCO on a case-by-case
basis.Recommended Sphere of Influence (2010 Amendment)-Pine Valley Sanitation District
One of the proposed actions of the “San Diego County Sanitation Services Reorganization”
would dissolve the Pine Valley Sanitation District and annex the territory of the district to the
Spring Valley Sanitation District. In February 2010, the Pine Valley Sanitation District provided
consent for the dissolution and adoption of a zero sphere of influence contingent on approval of
the reorganization proposal. The territory within the sphere of influence of the Pine Valley
Sanitation District and a special study area are proposed to be included in the Spring Valley
Sanitation District (to be re-named as the San Diego County Sanitation District). Figure 47
illustrates the recommended zero sphere of influence for the Alpine Sanitation District.
4. Administration, Management and Operations
Organizational and Management Structure
The public expects local agencies to function in a manner that will deliver efficient and timely
services. This depends, in large part, on the ability and capacity of the agencies’ administrative,
management and operations personnel to meet demands. The Wastewater Management Division
of the County of San Diego Public Works Department, Engineering Services will provide
administrative, management and operational oversight for the proposed “San Diego County
Sanitation District”. At present, each of the sanitation districts and maintenance districts are
operated as separated entities. Uniting them into one district would greatly simplify the amount
72
of effort for a multitude of tasks including preparation of budgets, rate setting, bookkeeping,
board reports and presentations.
The sanitation and maintenance districts share common administrative, engineering and
maintenance personnel and equipment through the County Public Works Department with
assistance from other County resources as required (e.g., Auditor and Controller). Administrative
and engineering offices are located at the County’s Operations Center in the Kearny Mesa area
of San Diego. Operations and maintenance facilities are located at the Spring Valley Operations
Center located near the intersection of Highway 94 and Jamacha Road in the Rancho San Diego
area.
The Wastewater Management Section is situated within the Public Works Engineering Services
Division. This division is one of four divisions which report to the Public Works Director
(Engineering Services, Management Services, Transportation, Land Development). The
Wastewater Section employs approximately 40 staff ( 26 field/14 professional) plus one part-
time executive position. The section is divided into three functional program areas – engineering,
operations, and public services. The section is administered by a Public Works Manager who
reports to the Deputy Director of Engineering Services (See Table 10).
Table 10
Sanitation District – Staff Organization
Executive 1
Management 4
Professional 10
Operations 26
Total Staff Years 41
The DPW sanitation district support arrangement has changed little in the past thirty years, but
staffing levels have historically declined as former sanitation districts have been absorbed or
reorganized due to incorporations or consolidation. Additionally, internal reengineering efforts,
designed to more closely match resources to service need, have led to further reductions. This
trend has stabilized in recent years. It now appears that staffing levels will fluxuate less and
remain at or near current levels for the next five to ten years.
The County Public Works Department management-to-staff ratio for the Wastewater Section is
approximately seven percent (excluding occasional executive charges) which is below the
median ratio of twelve percent. Staff turnover is low, an indication of adequate working
conditions, salaries, benefits and good employee morale.
All county sanitation districts are dependent districts governed by the San Diego County Board
of Supervisors. The proposed “San Diego County Sanitation District” would also be a dependent
district. The County Charter includes provisions that prohibit Board members or staff aides from
73
interfering with County staff responsibilities and functions who work under direction from the
County Chief Administrative Officer (CAO). Violations are an infraction and constitute
misconduct in office that is enforceable by the District Attorney. However, these regulations are
not intended to prevent Board members from seeking information and customer assistance. The
CAO has established procedures for responding to Board member requests and /or constituent
referrals.
Operations
Wastewater operations staff is called out to all sanitation district problems on a priority basis.
They also perform routine maintenance on all district collection sewers and pump stations. This
includes televised inspection of all sewer lines on a rotating basis. Sewage plant operators carry
out daily inspections of treatment plant facilities and monitor treated effluent in compliance with
Regional Water Quality Control Board regulations. A total of 340 miles of sewers are
maintained by operations personnel. Sanitary sewer overflow incidents are reported to the State
Water Resources Control Board using their mandated on-line reporting system.The operations
unit has received recognition and awards from professional wastewater associations for
excellence in small system operations.
Public Information and Outreach
County sanitation district agendas and action proposals are generally considered by the Board of
Supervisors on the second Wednesday of each month and available for public review on the
County’s website (see: Clerk of the Board). Where public notices and hearings are required,
notification is provided via local print media or, in certain instances, through direct written notice
as required by Proposition 218. District notifications are also provided to affected community
planning groups and the County Planning Commission. Sanitation district staff occasionally
appears before local planning groups, and business and civic associations to explain district
programs and to answer questions regarding specific wastewater matters (e.g., rate increases,
operational issues). As mentioned earlier, there is more limited public outreach concerning long
range district plans and capital improvement programs.
The Department of Public Works website also includes information on wastewater operations,
although it is of a general nature and not directed to individual specific sanitation districts. The
DPW website discusses wastewater collection and treatment operations, but does not identify
individual county sanitation districts, their budgets or current connection, and annual sewer
service charges. Individual sanitation district customers are likely to have difficulty locating
DPW wastewater and district operations because it is found only within the Engineering Division
section of the website. The County should consider revising the DPW website so that useful
information on each district is available and customer information can be easily located.
Consideration should also be given to dissemination of annual or bi-annual public information
reports on sanitation district activities to district customers.
74
Conclusions
The County Department of Public Works, Wastewater Management Section provides staff
support services to the sanitation districts. This staffing arrangement is stable and morale appears
to be good based on low turn over rates. Procedures have been adopted that regulate direct
contact between Board offices and staff. Operations personnel maintain over 339 miles of sewers
and have received recognition and awards from professional wastewater associations for
excellence in small system operations. Improvements in public participation and outreach should
be considered.
The proposed “San Diego County Sanitation District” can significantly reduce or eliminate a
number of tasks associated with managing and operating five sanitation districts and four
maintenance districts that provide sewer service.
5. Fiscal Review
Revenue Sources and Reserves
Revenues
All units of local government – counties, cities, and special districts – are financially
autonomous. Within the parameters of State Law, each local government has the ability to craft
an individual fiscal policy and associated practices. Each agency is equally empowered to make
independent fiscal decisions; however, the agency is not equally empowered to generate the
revenue to support those decisions.
Generally, special districts, as limited purpose agencies, are categorized as either enterprise or
non-enterprise districts. Enterprise districts operate in a manner similar to a private entity where
the cost of providing service is recovered through user fees or service charges. While each local
agency determines its own rate and fee structure based on local circumstances, there should be a
link or nexus between the amount of the fees or rates imposed and the cost of producing and
delivering the service. Historically, the courts, as in Shasta County v. Trinity County 1980, have
supported the relationship between fees and the cost of service delivery by stating, “… a fee
which exceeds the reasonable cost of service is a disguised tax.” Accordingly, rates and fees
must be responsibly set to ensure that revenue will be sufficient to compensate for the cost of
service provision. These districts do not rely, or only minimally rely, on property tax revenue to
fund operating costs.
Conversely, non-enterprise districts, such as those providing fire protection and emergency
medical, render services that benefit entire communities. Typically, those districts receive their
revenue as an allocation of the property tax. While non-enterprise districts may impose special
taxes and assessment charges, to do so they are subject to the provisions of Proposition 218,
75
which stipulates that approval must be granted through the election process. Furthermore,
approval requires either simple majority or a two-thirds majority to pass.
As limited purpose agencies, special districts may impose only the types of taxes, assessments,
and fees that have been authorized through legislation. The revenue sources available to each
class of special district are specifically defined in the different principal and special legislative
acts. The range of revenue sources available to local agencies is a critical element in accruing
funds. For limited purpose agencies, the revenue sources are scarce and generally restricted to
specific, inflexible uses. County sanitation districts and maintenance districts operate as
enterprise agencies. User fees are the primary revenue source and are collected annually on the
tax rolls. Revenues are used to cover administrative and operational costs. Connection and
annexation fees are also collected and applied to the capital expansion fund. Grants and loans are
used infrequently.
Reserves
In the context of this MSR, the term “reserves” refers to unrestricted funds that could be made
available for whatever purposes deemed necessary by an agency’s board of directors. On May 4,
2000, a Public Finance Special Report issued by Fitch IBCA (an International Rating Agency)
recounted that, “Maintaining an operating reserve or ‘rainy day fund’ is perhaps the most
effective practice that can enhance an issuer’s credit rating.” However, according to the
Government Finance Officers Association, a significant level of reserve funds should not of itself
be interpreted as evidence of overall economic health. For example, a local agency could
increase a reserve fund by obtaining a long-term debt. Although rating agencies that evaluate an
entity’s creditworthiness are likely to favor high reserve levels, other groups, consisting of
taxpayers, citizens, or union members, may view high levels of reserves as an indication that
taxpayers’ money is being horded.
While the California Constitution and the statutes that empower local governments contain
provisions for fiscal management, no standards for managing reserves have been adopted.
Government Code Section 53600 et seq. defines the objectives for safeguarding principal,
meeting liquidity needs, and achieving a return on investments, but offers no direction regarding
accumulating or using reserve funds. While annually collecting local agency financial reports
with information about reserves, the County Auditor does not assess the economic well being of
individual agencies based on reported reserve fund levels. “Moreover, it appears there are no
universally accepted standards upon which decision-makers may rely in determining what level
of reserves to maintain” (Southern San Diego County Water and Sewer Municipal Service
Review, Page 31). Even though no standards for reserve funds have been approved by the State,
there is a widely accepted belief that decisions concerning these funds should be shaped by
policy.
One of the conditions of the proposed reorganization is that reserves collected by each district, as
of the recordation of the reorganized district, will be used for capital improvements in the area
76
where they were collected. New reserves will be pooled in a single account and used as directed
by the governing board. Having a single reserve system will allow for greater flexibility in
capital improvement planning and implementation.
Sanitation District Sewer Service Charges
County sanitation and maintenance districts which rely on Metro for sewage treatment and
disposal (Spring Valley SD, Lakeside SD, Alpine SD, and the Winter Gardens, East Otay Mesa
Sewer Maintenance Districts) are vulnerable to Metro rate increases. Eventually, those increases
will be passed along to district customers. The “Metro” sanitation district rate structures are
generally divided into a local district collection rate and a Metro conveyance and treatment rate.
Together, they comprise the annual sewer service charge. Metro rates are also vulnerable, in
part, due to changing state and federal regulatory requirements. While the districts have control
over the local district charges, they have very limited authority to influence treatment and
disposal rates imposed by Metro. For this reason, sanitation district rates are subject to
adjustment any time Metro rates change.
In 2002 and 2004, the Board of Supervisors approved annual sewer service charge increases for
the Spring Valley, Lakeside, Alpine and Julian sanitation districts' customers, to be collected
over a five year period. These increases ranged from 4 percent to 7.5 percent. However, since
2009 rates have remained unchanged in all of the districts. The proposed FY2011-12 annual rate
for the proposed “San Diego County Sanitation District” is $336.
County Sanitation District Reserves
Dependent sanitation districts are financed primarily through annual user fee assessments. This
assessment method is authorized by the State Health and Safety Code (Section 5471). Additional
funds may be obtained through grants, assessments, bonds and developer contributions.
Routine replacement or repair of sewerage systems and facilities is funded by annual sewer
service charges (SSC). Replacement of facilities is usually required when facilities reach the end
of their useful life. For the major facilities, that useful life varies from 25 to 60 years.
It is common industry practice that users of a sewer facility fund a capital replacement reserve.
An appropriate way to do this is through setting aside a portion of the annual SSC so that funds
are available for replacement projects when required.
Construction of new facilities or expansions of facilities to increase capacity are funded by new
users through connection fees, developer contributions, assessments, bonds and other sources.
There is currently no policy which specifically addresses purchase of additional Metro capacity.
However, Board of Supervisors Policy I-99 does outline the requirements for an expansion
reserve, which all the Metro Districts have. This reserve would be the likely funding source for
purchasing additional Metro capacity. Due to increasing costs of Metro capacity and the potential
77
likelihood that additional capacity may be needed in the future, establishment of a special Metro
Capacity Purchase Reserve should be considered. This would help ensure that sufficient funds
have been identified and would be available when needed.
In some instances, expansion required for additional capacity and replacement due to
obsolescence or end of useful life may occur at the same time. In such cases, it is appropriate that
costs be shared by both existing and future users. However, every effort is made so that existing
users are not being required to fund facilities for expansion.
County sanitation districts follow replacement reserve practices consistent with Board of
Supervisors Policy I-99. Policy I-99 details requirements for reserve accounts, which include the
amounts necessary to fund a five-year capital improvement and maintenance program, as well as
fund 50 percent of the annual operating budget. No governing policy is used for unrestricted
assets.
Revenue Sources and Reserves
In regards to the Metro districts below, it should be noted that the Fund Balance at the end of FY
200 09-10 represents, in addition to ongoing Operations & Management, funding for scheduled
capital improvement projects, or carry-over funding for projects in process.
Spring Valley Sanitation District – Revenue Sources and Reserves
Revenue sources available to the Spring Valley SD include interest, annual sewer charges,
service connection capacity charges, and service to property owners and recovered expenditures
(annexation fees). A three year revenue summary, and summary of district reserves as of FY 200
09-10 is shown in Table 11.
Table 11
SVSD Revenues and Reserves
Revenue Source FY 2007-08 FY208-09 FY2009-10
(projected)
Interest
$1,487,120 $847,252 $420,205
Sewer Charge
$10,447,208 $10,853,359 $10,455,248
Capacity Charge
$39,025 $52,000 $$16,000
Prop. Owner Serv.
$3,113 $-2,728 $261
Other
$2,874,318 $996,883 $1,027,252
TOTAL
$14,850,756 $12,746,766 $11,918,966
78
Reserves FY 2009-10
Replacement Reserve $3,048,837
Expansion Reserve $8,715,588
Fund Balance $27,743,045
TOTAL at Year End $39,507,467
The large revenue variance under “Other” are due to a one-time discretionary cash infusion in
2007 from Waste Water Management Enterprise fund for excess overheads collected in prior
years.
Lakeside Sanitation District – Revenue Sources and Reserves
Revenue sources available to the Lakeside SD include interest, annual sewer charges, service
connection capacity charges, and service to property owners and recovered expenditures
(annexation fees). A three-year revenue/reserve summary is shown in Table 12.
Table 12
Lakeside SD Revenues and Reserves
Revenue Source
FY 2007-08 FY 20 08-09 FY 20 09-10
Interest
$784,139 $457,139 $228,817
Sewer Charge
$4,776,998 $5,068,187 $4,657,000
Capacity Charge
$76,686 $9,600 $20,000
Prop. Owner Serv.
$28,435 $5,850 $9,000
Other
$83,168 $28,027 $488,255
TOTAL
$6,499,426 $5,556,803 $4,421,072
Reserves FY 2009-10
Replacement Reserve $1,721,470
Expansion Reserve $669,618
79
General Reserve $0
Fund Balance $20,866,959
TOTAL at Year End $23,258,047
The large revenue variance under “Other” are due to a one-time discretionary cash infusion in
2007 from Waste Water Management Enterprise fund for excess overheads collected in prior
years.
Alpine Sanitation District – Revenue Sources and Reserves
Revenue sources available to the Alpine SD include interest, annual sewer charges, service
connection capacity charges, and service to property owners and recovered expenditures
(annexation fees). A three-year revenue/reserve summary is shown in Table 13.
Table 13
Alpine SD Revenues and Reserves
Revenue Source FY 2007-08 FY 200 08-09 FY 20009-10
Interest $116,087 $57,055
Sewer Charge $1,089,689 $1,194,292
Capacity Charge $103,910 $0
Prop. Owner Serv. $500 $5,800
Other $0 $135
TOTAL $1,488,017 $1,257,282 $1,215,390
Reserves FY 20009-10
Replacement Reserve $767,640
Expansion Reserve $712,740
Fund Balance $3,208,640
TOTAL at Year End $4,689,020
The large revenue variance under “Other” are due to a one-time discretionary cash infusion in
2007 from Waste Water Management Enterprise fund for excess overheads collected in prior
years.
80
Julian Sanitation District – Revenue Sources and Reserves
Revenue sources available to the Julian SD include interest, annual sewer charges, service
connection capacity charges, and service to property owners and recovered expenditures
(annexation fees). A three-year revenue/reserve summary is shown in Table 14.
Table 14
Julian SD Revenues and Reserves
Revenue Source
FY 20007-08 FY 20008-09 FY 2009-10
Interest
12,870 $3,862 $2,462
Sewer Charge
$222,428 $220,339 $225,000
Capacity Charge
$0 $0 $846
Prop. Owner Serv.
$0 $0 $0
Other
$142,121 $880 $15,505
TOTAL
$377,419 $225,081 $243,813
Reserves FY 20009-10
Replacement Reserve $62,680
Designated Accum. Cap $14,953
Fund Balance $97,986
TOTAL at Year End $175,529
The large revenue variances under “Other” are due to a one-time discretionary cash infusion in
2002 to assist with wastewater treatment system upgrades, and funding from a USDA grant/loan
in 2004 for completing the project.
Pine Valley Sanitation District – Revenue Sources and Reserves
Revenue sources available to the Pine Valley SD include interest, annual sewer charges, service
connection capacity charges, and service to property owners and recovered expenditures
(annexation fees). A three-year revenue/reserve summary is shown in Table 15.
81
Table 15
Pine Valley SD Revenues and Reserves
Revenue Source
FY 200 07-08 FY 200 08-09 FY 20009-10
Interest
$4,960 $2,093 $1,069
Sewer Charge
$69,368 $67,878 $70,806
Capacity Charge
$0 $0 $0
Prop. Owner Serv.
$0 $0 $0
Other
$109,705 $0 $0
TOTAL
$184,033 $225,081 $71,875
Reserves FY 20009-10
Replacement Reserve $56,195
Expansion Reserve $0
General Reserve $0
Fund Balance $$39,972
TOTAL at Year End $96,167
Other Funding Sources
Federal and state grants and loans are seldom used by the sanitation districts due to strict funding
criteria and other constraints which generally favor much larger wastewater operations (e.g.,
Metro). In 2002, the Julian SD applied for and was awarded a federal grant/loan of
approximately $247,000 to complete wastewater treatment system upgrades. The project was
completed in 2004. Grants and loans can be beneficial funding sources for the smaller districts
that have difficulty generating revenue for expensive system improvements.
Purchase of Additional Metro Capacity
As mentioned earlier, purchase of additional Metro capacity may be required in the future if prior
allocations become fully utilized. This could occur in the Lakeside or Alpine districts depending
on rates of development activity. The cost per gallon of purchased Metro capacity continues to
increase and should be monitored closely. Current connection charges should also be reviewed
periodically and adjusted to keep pace with rising Metro capacity purchase rates.
As used in this report, the term “Metro Capacity” refers to purchase of physical system capacity
expressed in cost/gallon. This is not meant to imply that actual physical plant capacity would be
available by Metro at the time it is needed.
82
Establishment of special Metro Capacity Reserve should be investigated, perhaps as a sub-
component of developer funded capacity charges. A portion of these funds could be set aside in a
reserve specifically for purchase of additional capacity. A similar procedure is utilized in the
East Otay Mesa Sewer Maintenance District.
Conclusions
Based on review of each of the above sanitation district revenue and reserve statements, it
appears - with the exception of the Julian and Pine Valley SD’s - they are adequate to meet
present and future service needs. Recent sewer service charge adjustments will provide sufficient
revenues to meet future operational and planned capital expenses, and maintain district reserves
at acceptable levels. The Julian and Pine Valley SD’s should closely monitor revenue and
reserve levels, and schedule periodic connection fee and annual service fee rate reviews to ensure
district operations remain adequate. Service and rate reviews every two to three years should be
considered. Establishment of a Metro Capacity Reserve should be investigated for the districts
served by Metro.
After existing capital reserve funds are exhausted within the current districts, the “San Diego
County Sanitation District” would have a single reserve account that would be available
anywhere within the new district. In FY 2009-2010, a reserve account for the combined district
would total almost $67 million (Capital Reserve-$56.7 million and Operating Reserve-$10.3). It
is anticipated the flexibility of having one rather than nine separate accounts will allow for more
flexibility in budget allocations.
6. Governance
Authority
The California Government Code authorizes the creation of special districts, which are units of
government that often provide municipal services to areas that are unincorporated (i.e., not
included in the boundary of a city). Nearly 30 different principal acts comprise the foundation
for forming agencies having distinct capabilities to provide various public services. Each
principal act defines a range of services that may be provided, delineates the territory that may be
served, specifies the composition of the governing board, and details the procedures for adding
or removing territory after district formation. With the introduction of State legislation in 1963,
Local Agency Formation Commissions (LAFCOs) were established in each county and
empowered to oversee the formation of new special districts.
Depending on the principal act under which it is formed, a special district may only provide
specified services. For example, a municipal water district may provide fire protection services
in addition to water, but is precluded from generating or transmitting electrical power. The
service(s) a district provides also may be restricted or limited by LAFCO’s responsibility to
regulate latent powers, which are the services authorized by the principal act but not provided by
83
the agency. In accordance with Government Code Section 56824.10, special districts may submit
a resolution to LAFCO requesting that the district be authorized to supply additional service(s).
County Sanitation Districts are authorized pursuant to California Health and Safety Code,
Sections 4700-4859. Sanitation districts may acquire, construct, operate and maintain sewage
collection, treatment and disposal works. They may also be used to provide for water production,
storage and distribution, refuse transfer and disposal, and street cleaning services.
The “San Diego County Sanitation District” will assume all sanitation services currently being
provided by the nine districts. The district is not requesting the ability to offer additional services
potentially allowed by the California Health and Safety Code.
Board of Directors and Administration
Each special district has a degree of independence that allows it to govern without interference
from other units of local government. Absent indictable criminal activity, the special district is
accountable only to the electorate. The governing body of an independent special district is the
Board of Directors. According to Elections Code Section 201, directors are required to be
residents and registered voters in the district where the duties of office are exercised. Directors
are elected to represent their constituency in making decisions affecting the district. Board
members are elected to a specific term, sworn into office, and expected to adhere to laws
governing the district as specified in the principal act. In addition, the Board may adopt by-laws,
policies, ordinances, standards and other legal requirements in governing the district.
According to the Health and Safety Code, the county sanitation district Board of Directors shall
be the County Board of Supervisors when the district includes no territory within a city or other
sanitary district. Board of Supervisor members are not subject to the district residency
requirements common to other special districts.
Often, a special district will hire a general manager, who conducts the district’s daily business.
Districts commonly have a clerk or secretary who is responsible for publishing hearing notices,
taking accurate minutes of all meetings, and ensuring compliance with legal mandates.
The Board of Supervisors has designated the County Department of Public Works as the primary
department responsible for provision of staff support services to the sanitation districts, including
management, administration, engineering, planning, and operation and maintenance. Support
from other county departments and/or consultants are also required from time-to-time (e.g.,
Auditor, Tax Collector, and Engineering support). The Clerk of the Board of Supervisors serves
as the clerk/secretary to the sanitation districts.
As local agencies, special districts must comply with provisions of the Brown Act as specified in
the California Government Code (refer to Conduct of Meetings in the next section.). Open
meetings are held to permit scrutiny by constituents, to make board members accountable for
84
decisions, and to offer a forum for public testimony, comments and complaints. Should a
member of the public wish to register a legal complaint against a board member or the board as a
whole, the method of recourse would entail contacting the affected board, Grand Jury and/or the
District Attorney. Beyond legal action, dissatisfied citizens can utilize the election process to
remove seated members and change the board’s composition.
Each existing sanitation district and sewer maintenance district currently conducts business as a
separate entity. The County Board of Supervisors acts directly on behalf of the sewer
maintenance districts. They are, however, required to operate as five governing boards of the
sanitation districts with separate district meetings. If reorganization is approved, the County
Board of Supervisors would act as the governing board for the proposed “San Diego County
Sanitation District”. It would no longer be necessary to have separate boards, agendas, staff
reports or minutes for nine districts.
Conduct of Meetings
Government Code Sections 54950 to 54962 govern the meetings that are conducted by public
commissions, boards, and councils, as well as other public agencies that exist to aid in carrying
out the people’s business. Accordingly, it is the intent of the law that the deliberations and
actions taken by those agencies be open, so that the people will be informed and retain control
over the governmental institutions they have created.
District board meetings must be conducted in a manner that allows public attendance as well as
an opportunity for the public to provide testimony. Specifically, Section 54953 stipulates that,
“all meetings of the legislative body of a local agency shall be open and public and all persons
shall be permitted to attend any meeting of the legislative body of a local agency.” In addition,
Section 54954.2 requires that prior to a regular meeting an agenda containing a brief description
of each item of business to be conducted shall be posted. The agenda shall specify the time and
location of the meeting and shall be posted in a location that is freely accessible to members of
the public.
These requirements also pertain to special meetings. Every notice for a special meeting shall
provide an opportunity for members of the public to directly address the legislative body
concerning any item that has been described in the notice for the meeting.
The Board of Supervisors has adopted Rules of Procedure which govern the conduct of all Board
meetings, including meetings in which they act as the Board of Directors for the County
Sanitation Districts. These procedures address the time and place for meetings, meeting agendas,
order of business, public participation, parliamentary procedures and related matters. Sanitation
District matters are scheduled for the second Wednesday of the month unless otherwise stated.
Copies of agendas as well as agenda back-up materials are available from the Clerk of the Board,
by mail subscription or via the County Internet Website.
85
The current procedures for conducting meetings would not be changed, if the reorganization is
approved.
Consolidating Services
Under certain circumstances, regional services could be reorganized or consolidated to gain
service efficiencies and cost savings. This is particularly true when multiple agencies within a
geographic region either provide the same or similar services, or could be empowered to provide
the same or similar services. A primary objective of LAFCO is to review ways to reorganize,
simplify, and streamline governmental structure, so that public services are efficiently and
economically provided to area residents.
Spring Valley Sanitation District
As stated in LAFCO’s Southern San Diego County Water and Sewer Municipal Service Review,
adopted February 2, 2004, the Otay Water District and SVSD share service responsibility in
portions of the Jamacha Basin. Determination 7.10 in that MSR recommended that consolidation
of sewer service responsibilities in the Jamacha Basin is evaluated further. Although that
determination appears to still have validity and is continued as a recommendation in this County
Sanitation District MSR and sphere update, the two districts have not seen any reasons since
2007 to address this topic in further detail. The Spring Valley District, which is proposed to be
re-named as the “San Diego County Sanitation District”, will become part of a larger county-
operated unified district. The opportunity to investigate this topic further would still be available
with the reorganized district.
Lakeside Sanitation District
The previous section discussed the recent reorganization of service responsibilities between
Padre Dam MWD and Lakeside SD. Two additional areas could be candidates for service
consolidation. The first is a residential area served by Padre Dam MWD within the Lakeside
community east of Riverford Road and north of Riverside Drive. This area was omitted from the
recent boundary change but might still be more efficiently served by Lakeside SD. The second
consolidation candidate would consist of merging the Winter Gardens Sewer Maintenance
District into the Lakeside SD. The proposed “San Diego County Sanitation District” would result
in the Lakeside Sanitation District and Winter Gardens Sewer Maintenance District becoming
part of the larger district.
Alpine Sanitation District
If a proposed reorganization is apporoved, the Alpine Sanitation District would be dissolved and
become part of the proposed “San Diego County Sanitation District.”
86
Julian Sanitation District
The Julian SD and the Julian Community Services District (water) share similar boundaries.
Service consolidation should be considered. Additional financial and service review would be
required to determine feasibility and public acceptance. No serious consideration was given to
consolidating these two districts after adoption of the 2007 MSR/SOI study. The proposed “San
Diego County Sanitation Distict” would offer the potential for greater financial stability and
technical expertise because of the County Department of Public Works’ experience with public
sewer collection and treatment systems.
Pine Valley Sanitation District
Although, no opportunities for consolidation were identified in 2007, Pine Valley Sanitation
District could be dissolved and responsibility transferred to the “San Diego County Sanitation
District.
Conclusions
The Board of Supervisors serves as the governing body for the County sanitation districts and
sewer maintenance districts. The Board has adopted procedures which govern the conduct of
sanitation district meetings, including the time and place of meetings, agendas, public
participation and related matters. Copies of agendas are back-up materials available from the
Clerk of the Board, by mail or from the internet. Consolidation of sewer service responsibilities
between the Otay WD and Spring Valley SD in the Jamacha Basin should continue to be
evaluated. After adoption of the 2007 MSR/SOI, the County of San Diego looked at various
options to consolidate sanitation services. In analyzing various alternatives, the County decided
that combining all of the sanitation districts and maintenance districts offered a more
comprehensive approach rather than addressing only “Metro” agencies.
87
SECTION III: MSR DETERMINATIONS
GOVERNMENT CODE SECTION 56430
Government Code § 56430 requires LAFCO to conduct comprehensive reviews of municipal
services and prepare a written statement of determinations for six categories of inquiry.
Determinations are not findings of fact; rather, they are “… declaratory statements that make a
conclusion, based on all the information and evidence presented to the Commission.” The
determinations are based on a comprehensive analysis of local agency service information. This
evaluation establishes the basis for commission determinations and conclusions about the
adequacy of service provision. The commission, other agencies, or the public may use the
determinations to provide guidance for future decisions; however, the determinations themselves
do not represent recommendations for action.
Services
In 2004, LAFCO staff asked the County of San Diego, Public Works Department to complete a
Request for Information (RFI). The RFI process is used as the primary method for collection of
agency data and information in preparing the MSR. In response to LAFCO’s RFI, the County
provided information for each of the sanitation districts governed by the Board of Supervisors.
Also included was information related to other County wastewater operations not subject to
MSR review (e.g., Campo).
Review of the RFI, along with additional research and staff discussions, shows that County
sanitation district activities are limited to sewer collection and treatment operations only. There
are no plans at this time to provide additional services in any of the districts pursuant to latent
power provisions that would require LAFCO approval. No service overlaps have been identified,
but some adjoining agencies (e.g., Otay WD, Chula Vista) share and depend on continued use of
sanitation district facilities - such as the regional outfall sewer operated by the Spring Valley
Sanitation District.
Geographic Region
County sanitation district operations are generally located in the eastern and southern portions of
the San Diego region. The SVSD and Alpine SD are located within Sweetwater River watershed,
while the Lakeside SD and Julian SD are situated in the San Diego River watershed. Pine Valley
SD is located in the Tijuana River watershed. Collectively, these sanitation districts comprise a
small fraction of the unincorporated watershed areas in which they are located. With minor
exception these districts are not expected to change appreciably in the foreseeable future.
88
DETERMINATIONS
The following determinations, which were originally written for the 2007 MSR/SOI report for
the five sanitation districts, have been updated to account for the circumstances associated with
the proposed “San Diego County Sanitation District.” Subsequent to the adoption of this
MSR/SOI Update Study in 2007, the California State legislature consolidated the number of
written determinations that are required for a Municipal Service Review. Government Code
Section 56430 now requires the following areas be addressed:
• Growth and population projections for the affected area.
• Present and planned capacity of public facilities and adequacy of public services, including
infrastructure needs or deficiencies.
• Financial ability of agencies to provide services
• Status of, and opportunities for, shared facilities.
• Accountability for community service needs, including governmental structural and
operational efficiencies.
• Any other matter related to effective or efficient service delivery, as required by commission
policy.
The following amended determinations will fulfill LAFCO requirements for the reorganized
district.
DETERMINATION 1: GROWTH AND POPULATION PROJECTIONS FOR THE AREA
Efficient provision of public services is linked to an agency’s ability to plan for future need. For
example, a water purveyor must be prepared to supply water for existing and future levels of
demand, and also be able to determine where future demand will occur. Municipal service
reviews give LAFCO, affected agencies, and the public the means to examine both the existing
and future need for public services and to determine whether projections for future growth and
population patterns are integrated into service planning functions.
Projected growth increases translate into increased need for services, and the need to anticipate
where services will be required, especially in areas where no services currently exist. Since
service demand influences both location and capacity of future public facilities, it is important
that agreed upon population and development forecasts serve as the corner stone of the region’s
planning processes.
Since population projections anticipate increases for the year 2030, strategic wastewater system
planning is vital to maintain seamless service provision. The County Public Works Department
provides planning and operational support for each of the sanitation districts subject to this MSR.
89
The facility planning process is repeated approximately every ten years for the larger sanitation
districts – Spring Valley SD, Lakeside SD and Alpine SD. The smaller districts (Julian and Pine
Valley) and sewer maintenance districts are reviewed on an as needed basis. The updated plans
generally cover a ten-year time frame for identification of near or longer term capital project
requirements. General plan land use and population projections are examined and incorporated
into the planning process each time an update occurs.
The authority to carry out land use and wastewater facility planning activities within a single
agency (i.e., County of San Diego) promotes coordination between planning and service delivery
functions. The County’s Planning and Land Use and Public Works Wastewater management
staff coordinate between their respective planning functions. This coordination is improved
further through numerous Board of Supervisor policies which address matters such as land use
and wastewater facility locations, timing and capacity limits. The projected population goals for
the sanitation districts appear to be in general agreement with the community planning goals
within each respective sewer service area.
While internal planning coordination occurs within the County, problems can arise when land
use plan updates (e.g., General Plan Update) and wastewater facility plan updates occur during
different time intervals. This occurred recently when preparation of the facility plans utilized
regional instead of approved local area population projections (the County’s CPA forecasts were
not available). Since general plan updates occur at more infrequent intervals than the recurring
ten year wastewater facility plan reviews, it is important that, to the extent possible, pre-agreed
upon population and land use projections be incorporated into the wastewater planning process.
During preparation of the next ten year facility plan, approved General Plan Update land use and
population projections will be utilized. This should reduce or eliminate further facility planning
coordination problems.
Since it is likely that in the future the Lakeside and/or Alpine sanitation districts will need to
purchase additional Metro capacity, careful consideration of plans, population projections, and
review of current development based charges is necessary. To ensure that sufficient funds have
been identified and available when needed, establishment of a special Metro Capacity Purchase
Reserve fund should be evaluated. One method to consider would be to obtain funding as a
component of developer financed capacity purchase The proposed “San Diego County Sanitation
District” could consider the use of this financial mechanism, as deemed appropriate,
The proposed “San Diego County Sanitation District”, in conjunction with the General Plan
Update effort, should coordinate a comprehensive review of Board Policy I-106. Sewer
conveyance problems, which led to the adoption of the policy, have been resolved through
90
downstream system improvements. Moreover, interim facilities constructed in conjunction with
the original policy (e.g., Lakeside flow Equalization Facility) have been removed from service.
In 1996 , the City of San Diego completed improvements to the Mission Gorge Trunk sewer
system, including the East Mission Gorge Interceptor discussed above. This resulted in
additional system capacity for future need by the East County agencies that rely on Metro
(Alpine, Lakeside, Winter Gardens, Padre Dam and El Cajon). Policy I-106 state that “Until
such time as the district engineer can demonstrate that sufficient capacity is or will be available
in the Mission Gorge Trunk Sewer or by other means of treatment or disposal” sewer
commitments or wastewater discharge permits would be issued according to established criteria.
The Mission Gorge pump station, force main, and trunk sewer link have sufficient capacity for
projected buildout of the adopted County General Plan Policy I-106; consequently the criteria is
no longer applicable.Due to the fact that Policy I-106 was initially created as a result of sewage
conveyance problems, which have since been corrected, the policy should be reviewed in
conjunction with the General Plan Update.
DETERMINATION 2: PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES
AND ADEQUACY OF PUBLIC SERVICES INCLUDING INFRASTRUCTURE NEEDS OR
DEFICIENCIES
In authorizing the preparation of municipal service reviews, the State Legislature has focused on
one of LAFCO’s core missions — encouraging the efficient provision of public services.
Infrastructure needs or deficiencies, which refers to the adequacy of existing and planned public
facilities in relation to how public services are – and will be – provided to citizens, impacts the
efficient delivery of public services. For an MSR, “adequate level of service” is defined as the
norm for the area under study. Infrastructure can be evaluated in terms of capacity, condition,
availability, quality; and correlations among operational, capital improvement, and finance plans.
It is recognized that there may be unmet infrastructure needs due to budget constraints or other
factors; nevertheless, identification of deficiencies may promote public understanding and
support for needed improvements.
The proposed “San Diego County Sanitation District” will assume the service responsibilities of
the existing sanitation and sewer maintenance districts. With the exception of the Julian
Sanitation District, no significant infrastructure needs or operational deficiencies have been
identified in the Spring Valley, Lakeside, Alpine and Pine Valley Sanitation Districts. None of
the maintenance districts (East Otay, Harmony Grove Village, Campo, Winter Gardens), which
are proposed to become part of the unified district, present any special service challenges.
Service levels appear adequate to meet current needs, and facility and financing plan procedures
are in place to address future conditions. Existing facilities are maintained (or replaced) by
operations staff who utilizes good equipment, technology, (e.g., video system inspections, early
warning devices) and safety procedures to keep district systems operational. As no significant
91
changes have taken place since the adoption of the 2007 MSR/SOI the proposed “San Diego
County Sanitation District” should be able to meet on-going and forecasted obligations.
The County Wastewater Management “Operational & Management” unit, which will be
responsible for the proposed San Diego County Sanitation District” has been recognized for
these efforts as recipient of numerous awards for local wastewater collection operations. There
has been one significant wastewater discharge violation issued by the Regional Water Quality
Control Board in the last ten years. In this report significant violation means an unauthorized
sewer discharge exceeding 10,000 gallons per day resulting in warnings, fines or penalties. This
occurred in 2002 and concerned a sewer spill within the Alpine Sanitation District’s Galloway
Pump Station/Force Main system. This problem was corrected with construction of a new force
main sewer.
Planning for future facility needs appears adequate for the individual sanitation districts;
however, these plans seldom are presented to district ratepayers or the Board of Supervisors for
review and approval. Procedures should be developed that provide for public review of these
plans prior to preparation of individual capital improvement programs and possible rate
adjustments that may be necessary for plan implementation.
Historically, septic disposal problem areas within or bordering district boundaries are not
routinely reviewed or mapped for use in the facility planning process. Service
extensions/annexations resulting from septic failures are usually handled on a case-by-case basis.
This results in numerous individual annexation/concurrent sphere amendment applications
presented to LAFCO. Inclusion of this information in the planning process, and dissemination to
property owners, could help to bring about more collective annexation proposals (and cost
reductions) and better coordination of sewer extension facilities to septic system problem areas.
Recent (GIS) mapping systems from the County’s Environmental Health Department
helpimprove data collection and analysis on septic system problem areas. Septic areas identified
through this process may be a useful tool for future master plan updates and sphere of influence
reviews. Such information might also help to encourage collective annexation proposals, thereby
reducing the LAFCO processing cost for individual applications. However, care must be taken
when analyzing GIS septic information to separate septic systems that cannot be repaired from
those being enlarged to accommodate remodeling projects and permits pulled to accomplish
septic repairs. Procedures should be investigated that might improve opportunity for
ratepayer/public review of long range district facility master and financing plans. These plans
are typically used for internal planning and budgeting purposes, and become an integral part of
the larger County Public Works Department program and budget.
A systematic review of existing or potential septic problems areas should be conducted for use in
the facility plan update process. Inclusion of this information will also be useful to LAFCO in
92
future sphere of influence review updates, and may help encourage more collective annexation
opportunities and associated cost reductions.
The Julian Sanitation District treatment facility is operating at maximum capacity and no
additional connections are permitted except documented septic failures and a few pre-approved
sewer capacity commitments. Operating expenses are high and continue to increase due to
increasing labor and energy cost, and to remain in compliance with water quality discharge
regulations. Sewer service charge increases will likely be required on a frequent basis just to
maintain current operations. When combined, lack of significant capacity demands, community
support and financing constraints suggest the wastewater treatment plant will remain at current
capacity levels for the foreseeable future. Therefore, while treatment plant deficiencies exist,
Board of Supervisor Policy I-113 provides an adequate growth management tool to protect and
manage current sewer capacity limitations. This policy will be assumed by the proposed “San
Diego County Sanitation District”. The proposed “San Diego County Sanitation, because of a
larger financial base than the Julian Sanitation District, will likely be in a stronger position to
address circumstances associated with the wastewater treatment plant.
DETERMINATION 3: FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
LAFCO must weigh a community’s public service needs against the resources available to fund
the services. During municipal service reviews, the financing constraints and opportunities,
which have an impact on the delivery of services, are reviewed and enable LAFCO, local
agencies, and the public to assess whether agencies are capitalizing on financing opportunities.
Service reviews may also disclose innovations for contending with financing constraints, which
may be of considerable value to numerous agencies.
County sanitation and sewer maintenance districts are financed primarily through annual sewer
service charges, which are included with annual property tax statements. This method of billing
is authorized under the State Health and Safety Code (Sec. 5471). As an enterprise district,
sewer service charges are not considered a property assessment. These annual charges are used
to cover on-going operation and maintenance costs, including Metro charges. A portion of these
charges are set aside in operational reserve accounts to cover facility replacements and upgrades,
and for unanticipated expenses (e.g., system emergencies and breakdowns).
Long-term financing tools such as issuance of bonds, or loans are seldom used. The same is true
for grant programs. This is, in part, due to the smaller customer base of several of the districts,
and the absence of large scale treatment and disposal facilities.
In general, the smaller county sanitation districts have faced financial challenges because of
their limited user revenue base. Having adequate operational, maintenance and capital
93
improvement funds has often been difficult. The proposed “San Diego County Sanitation
District” would provide a much larger financial base. Establishing a single annual rate schedule
for users would remove the wide variation between districts.
Construction of new facilities or expansion of existing facilities to accommodate new growth are
funded by new users through connection fees, developer contributions, assessments, bonds and
other sources. In some instances where system upgrades are constructed in response to new
growth, as well as to replace older or deteriorating facilities, costs may be shared by both
existing and future users.
The proposed “San Diego County Sanitation District” will initially start with the annual sewer
service charge of the Spring Valley Sanitation District – currently $336 per EDU – being applied
uniformly to all parcels located in and annexed into this district. Other previously approved fees
in each of the districts being dissolved and/or annexed will remain unchanged and continue to be
charged until changed by the new district.
County sanitation district reserves are classified under the categories of replacement reserve and
expansion reserve. Reserve practices are consistent with Board of Supervisors Policy I-99 which
sets forth the requirements for the various accounts. Reserve amounts must be sufficient to fund
a five-year capital improvement and maintenance program, and at least 50 percent of each
districts annual operating budget. The proposed “San Diego County Sanitation District” would
assume Policy I-99.
County sanitation district reserve practices appear adequate to meet current and projected five
year needs in regards to the Metro districts. The Julian and Pine Valley sanitation districts, due to
their limited size and customer base, frequently have difficulty maintaining sufficient reserves.
The proposed “San Diego County Sanitation District” will provide a larger financial base and a
consolidated reserve accounts which will address the problems historically faced by the smaller
districts.
The proposed “San Diego County Sanitation District” similar to County sanitation districts
which rely on Metro for sewage treatment and disposal (Spring Valley, Lakeside, Alpine) are
vulnerable to rate increases which are passed along to district customers. The “Metro” sanitation
district rate structures are generally divided into a local district collection rate and a Metro
conveyance and treatment rate. Together, they comprise the annual sewer service charge. Metro
rates are also vulnerable, in part, due to changing state and federal regulatory requirements.
While the district has control over the local district charges, they have very limited authority to
influence treatment and disposal rates imposed by Metro. Therefore, sanitation district rates are
subject to adjustment at any time Metro rates may change. This circumstance will not change
with the establishment of a combined district.
94
In 2002 and 2004, sewer service charges were increased in the Julian, Spring Valley, Lakeside
and Alpine sanitation districts. For Julian a 5 percent increase per year was adopted over a five
year period. For the Lakeside and Alpine sanitation districts a 7.5 percent per year increase was
approved over a five year period. The Spring Valley increase was 4 percent per year over a five
year period. Fees were raised in 2008 for Spring Valley, Alpine and Lakeside but have not been
increased since that time.
In 2004, the Winter Gardens Sewer Maintenance District was determined to have significant
reserves but lacked any significant capital projects in the near term. The annual rate for service
was dropped from $264 to $216. However, recent rate analysis has determined the current cost
of service to district customers is $288 /year—without any reserves set aside for future CIP.
A standard rate of $336 annually is proposed for the new San Diego County Sanitation District
during FY2011-12, with assumed rate increases of 5% thereafter. Actual rates, which are
dependent on many factors, including inflation, capital needs, and the City of San Diego’s Metro
Wastewater Treatment costs, will be determined by the district’s governing board in the future.
The objective is to ensure financial stability to enable continuation of adequate wastewater
collection and disposal operations, to avoid potential sewage spills, system outages and
associated water quality and/or public health problems.
During the next sewer service charge and adjustment review process, the sanitation district
because it relies on Metro for treatment and disposal in a number of areas should undertake a
comprehensive review of the need for and ability to pay for purchase of additional capacity,
should it be required. The facility plan reviews did not indicate the need for additional capacity
at this time, but this matter needs to be closely monitored in the future.
Current capacity fee charges used to finance growth related improvements are generally based on
system buy-in and system facility costs. Future Metro capacity costs do not appear to be factored
into the capacity rate setting process. Until recently this was not considered a problem of
significance in rate review. However, the cost per gallon of purchased Metro capacity has risen
rapidly in recent years. Close monitoring of Metro capacity costs will hopefully result in future
cost avoidance through adoption of capacity fee charges that fully reflect the overall costs for
wastewater collection at the district level, and conveyance, treatment and disposal at the regional
(Metro) level.
DETERMINATION 4: STATUS AND OPPORTUNITY FOR SHARED FACILITIES
Public service costs may be reduced and service efficiencies increased, if service providers
develop strategies for sharing resources, such as communication centers, wastewater treatment
facilities, and distribution lines. Sharing both facilities and excess system capacity decreases
95
duplicative efforts, may lower costs, and minimizes unnecessary resource consumption. The
service review inventories facilities in the study area to determine if facilities are currently being
utilized to capacity and whether efficiencies can be achieved by accommodating the facility
needs of adjacent agencies. Options for planning future shared facilities and services are also
considered.
Public service costs may be reduced and service efficiencies increased, if service providers
develop strategies for sharing resources, such as communication centers, wastewater treatment
facilities, and distribution lines. Sharing both facilities and excess system capacity decreases
duplicative efforts, may lower costs, and minimizes unnecessary resource consumption. The
service review inventories facilities in the study area to determine if facilities are currently being
utilized to capacity and whether efficiencies can be achieved by accommodating the facility
needs of adjacent agencies. Options for planning future shared facilities and services are also
considered.
The proposed “San Diego County Sanitation District would utilize common administrative,
engineering and maintenance personnel and equipment through the County Public Works
Department. Administrative and engineering offices are located at the County’s Operations
Center in the Kearny Mesa area of San Diego. Operations and maintenance facilities are located
at the Spring Valley Operations Center located near the intersection of Highway 94 and Jamacha
Road in the Rancho San Diego area.
The Spring Valley Sanitation District currently maintains system interconnection agreements
with the cities of San Diego, Chula Vista, Lemon Grove, La Mesa, National City and the Otay
Water District which, collectively, utilize the Spring Valley Outfall Sewer for connection to
Metro. The Lakeside and Alpine sanitation districts maintain interconnection agreements with
the City of San Diego and the Padre Dam MWD for conveyance of wastewater from the Upper
San Diego River basin to the Metro system. The proposed “San Diego County Sanitation
District” would continue to honor existing agreements with other agencies.
The proposed “San Diego County Sanitation District” will become recognized as one of the
Participating Agencies in the Metro system and remain responsible for fair share costs of Metro
capital, operating and maintenance expenses. These costs are normally referred to as “Metro
fees”. The agency will also participate on the Metro Commission, which meets monthly and be
provided opportunity to review and provide comments of Metro related costs that affect
individual agency operations.
The proposed “San Diego County Sanitation District would utilize common administrative,
engineering and maintenance personnel and equipment through the County Public Works
Department. Administrative and engineering offices are located at the County’s Operations
Center in the Kearny Mesa area of San Diego. Operations and maintenance facilities are located
96
at the Spring Valley Operations Center located near the intersection of Highway 94 and Jamacha
Road in the Rancho San Diego area.
The proposed “San Diego County Sanitation District” will become recognized as one of the
Participating Agencies in the Metro system and remain responsible for fair share costs of Metro
capital, operating and maintenance expenses. These costs are normally referred to as “Metro
fees”. The agency will also participate on the Metro Commission, which meets monthly and be
provided opportunity to review and provide comments of Metro related costs that affect
individual agency operations.
DETERMINATION 5: ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS,
INCLUDING GOVERNMENTAL STRUCTURAL AND OPERATIONAL EFFICIENCIES
In making a determination of local accountability and governance, LAFCO will consider the
degree to which local accountability is fostered in the region. Local accountability and
governance refers to public agency decision making and operational and management processes
that: (1) include an accessible and accountable elected or appointed decision making body and
agency staff; (2) encourage and value public participation; (3) disclose budgets, programs, and
plans; (4) solicit public input when considering rate changes, work and infrastructure plans; and
(5) evaluate outcomes of plans, programs, and operations, and disclose results to the public.
The County Board of Supervisors have well established procedures and good accessibility for
obtaining public input on sanitation district agenda items. The second Wednesday of each month
is specifically set aside to consider individual sanitation district matters, except during the
Board’s annual budget deliberation process which is advertised at different times for individual
County functional groups and departments.
The proposed “San Diego County Sanitation District” should implement website access
programs to make them more visible and accessible to the public.
Internet based information on the County sanitation districts can only be obtained from the
County of San Diego website. Web information regarding the County sanitation districts has
been minimal and obscured under layers of County of San Diego and Department of Public
Works information.
To enhance public outreach, consideration should be given to preparation of annual or bi-annual
public information reports on sanitation district activities for distribution to customers.
Other than limited website information discussed above, the County does not provide general
customer information in the form of an annual report or other public information tools which are
commonly used in other special district settings. Such information would help customers better
97
understand the sewage collection and treatment process, relationship to Metro programs and how
revenues are collected and utilized by the district.
Management efficiency refers to the organizational effectiveness of service delivery. Efficiently
managed agencies consistently implement plans to improve service delivery, reduce waste,
eliminate duplications of effort, contain costs, maintain qualified employees, build and maintain
adequate contingency reserves, and encourage and maintain open dialogues with the public and
other public and private agencies. The service review evaluates management efficiency by
analyzing agency functions, operations, and practices – as well as the agency’s ability to meet
current and future service demands. Services will be evaluated in relation to available resources
and consideration of service provision constraints.
The County Public Works Department management-to-staff ratio for the Wastewater Section is
approximately 7 percent (excluding occasional executive charges), which is below the median
ratio of 12 percent. Staff turnover is low, an indication of adequate working conditions, salaries,
benefits and good employee morale.
County sanitation districts currently implement Board of Supervisors Policy I-99: “Expenditures
and Use of Revenue for Replacement and Expansion of Liquid Waste Facilities”. This policy
addresses permitted uses of expansion and replacement reserves for facility upgrades, but does
not mention rate stabilization as a possible policy objective. The policy for replacement reserves
provides funding for 50 percent of district annual operating costs and undesignated fund balance
to meet unexpected cost increases. Policy I-99 would be assumed by the reorganized district.
The County of San Diego Charter includes provisions which prohibit Board of Supervisor
members, or staff, from interfering with employees. Violations are an infraction and constitute
misconduct in office that is enforceable by the District Attorney.
DETERMINATION 6: ANY OTHER MATTER RELATED TO EFFECTIVE OR EFFICIENT
SERVICE DELIVERY, AS REQUIRED BY COMMISSION POLICY
The consolidation of the County’s sanitation responsibilities offers numerous benefits for
customers of the nine county sanitation and maintenance districts, the Board of Supervisors and
County Staff. Creating a single district will:
• Promote a more comprehensive rather than individualized approach to each district
• Simplify a complex and fragmented system based on multiple districts
• Provide the ability for rate consolidation and a more equalized service
• Increase flexibility for planning, funding and implementing capital improvements
• Allow for a more efficient use of County Public Works staff, resources and equipment
• Streamline the governing system of multiple hearings conducted by the Board of Supervisors
98
• Reduce overall administrative costs for the Wastewater Management Section
• Increase bonding capacity to finance sewer improvements
• Enhance the ability to pursue water reclamation opportunities
• Assist the small less viable districts without impacting the stability of the larger districts
99
APPENDIX A
STATEMENTs OF DETERMINATIONS FOR SPHERES OF INFLUENCE FOR:
SAN DIEGO COUNTY SANITATION DISTRICT (FORMERLY SPRING VALLEY
SANITATION DISTRICT)
LAKESIDE SANITATION DISTRICT (ZERO SOI)
ALPINE SANITATION DISTRICT (ZERO SOI)
JULIAN SANITATION DISTRICT (ZERO SOI)
PINE VALLEY SANITATION DISTRICT (ZERO SOI)
100
STATEMENT OF DETERMINATIONS
SPHERE OF INFLUENCE FOR THE
SAN DIEGO COUNTY SANITATION DISTRICT
(FORMERLY NAMED THE SPRING VALLEY SANITATION DISTRICT)
The following statement of determinations is prepared pursuant to Section 56425 of the
Government Code for an update to the sphere of influence boundary for the Spring Valley
Sanitation District. As part of the proposed “Reorganization of County Sanitation Services”, the
Spring Valley Sanitation District boundary will be expanded to include the territory within four
dissolving sanitation districts (Alpine Sanitation District, Lakeside Sanitation District, Julian
Sanitation District, Pine Valley Sanitation District) and four maintenance districts (Campo Water
and Sewer Maintenance District, Harmony Grove Sewer Maintenance District, East Otay Mesa
Sewer Maintenance District and Winter Gardens Sewer Maintenance District). To reflect the
broaden geographic area and responsibilities, the Spring Valley Sanitation District will be re-
named as the San Diego County Sanitation District. Accompanying the reorganization is a
proposed sphere of influence boundary which includes the territory currently within the Spring
Valley Sanitation District sphere of influence, the territory within the spheres of the four
dissolving sanitation districts and the territory currently within the boundaries of the four
maintenance districts.
A written statement from the affected district specifying the function or classes of service
provided was originally approved for the Spring Valley Sanitation District on April 6, 2001 and
ratified on June 11, 2007, and affirmed as part of the 2010 formation of the San Diego County
Sanitation District.
(1) The present and planned land uses in the area as determined by existing and proposed
general plan land use designations.
The San Diego County Sanitation District sphere of influence, encompassing approximately 58.3
square miles, includes a mixture of land use designations. Existing uses provide for residential,
commercial and industrial activity. The County of San Diego is currently considering changes to
the various community plans overlapping the San Diego County Sanitation District as part of the
General Plan Update. Community Plans that fall within the district’s proposed sphere include:
• Spring Valley Community Planning Area
• Sweetwater Community Planning Area
• Valle de Oro Community Planning Area
• Alpine Community Planning Area
• Lakeside Community Planning Area
• Julian Community Planning Area
• Pine Valley Community Planning Area
101
• Mountain Empire Community Planning Area
• North County Metro Subregional Planning Area
• Otay CommunityPlanning Area
The communities to be served differ significantly as each reflects specific circumstances related
to existing/projected growth. The vast majority of those who will receive public sewer service
from the San Diego County Sanitation District are concentrated in the former Spring Valley and
Lakeside Sanitation Districts. The County’s proposed General Plan Update, which provides a
blueprint for future growth, offers very different visions for the individual communities that are
served by either county sanitation or sewer maintenance districts. The future sewer service needs
of East Otay Mesa, which is slated for industrial and commercial uses is far different from
rural/semi-rural areas where the extension of public sewers is constrained by the adopted policies
of the Board of Supervisors. A continuing challenge for San Diego County is to coordinate
decisions concerning the intensity, timing and location of growth with public facility planning,
financing and implementation.
The present and planned land uses in the area will not be affected by an expanded sphere of
influence as the County Board of Supervisors will continue to be responsible for all decisions
associated with the adoption of the General Plan Update. The San Diego County Sanitation
District will also continue to be subject to adopted Board policies governing growth and sewer
systems.
(2) The present and probable need for public facilities and services in the area.
(3) The present capacity of public facilities and adequacy of public services which the
agency provides or is authorized to provide.
Combining five sanitation disticts and four maintenance districts into a single sanitation district
will not affect the present or probable need for public facilities and services. All of the districts
and maintenance areas are able to meet their individual service obligations.
The Spring Valley Sanitation District (SVSD) was formed in 1952 and operates and maintains
sewage collection and conveyance facilities for the unincorporated communities of Spring
Valley, Valle de Oro and Sweetwater. These communities are located east of Highway 125, and
north and south of Highway 94. The SVSD is approximately 20 square miles in area, with an
estimated population of 85,000 residents (DPW/SANDAG). The SVSD also adjoins the cities of
San Diego, La Mesa, Lemon Grove, National City and Chula Vista. Other independent districts
providing related services in the area include the Otay Water District (water/sewer), Sweetwater
Authority (water) and the Helix Water District (water).
102
The SVSD has approved interagency agreements which provide shared use and costs for access
to SVSD facilities. These agreements are with the cities of San Diego, La Mesa, Lemon Grove,
National City, and Chula Vista, and the Otay Water District. The agreements predate current
LAFCO review requirements. SVSD facilities - primarily the Spring Valley Outfall Interceptor -
are utilized by these agencies to convey wastewater to the Metro System. The SVSD has 10.35
million gallons per day (mgd) of Metro capacity rights. Current annual discharge flows through
the SVSD Outfall average about 7.2 mgd (includes existing flows plus service commitments).
Therefore, system capacity reserves are available to support future service needs.
The Lakeside Sanitation District was formed in 1955 to provide for sewer collection and
conveyance for the unincorporated community of Lakeside. The District maintains 73 miles of
sewer collection and transmission facilities and two pump stations. Wastewater facility and
capital improvement plans are updated approximately every 5-10 years. A review of these plans
indicates that projected annual wastewater flows will increase from 2.5 million gallons per day
(mgd) in 2005 to approximately 4.3 mgd by the year 2020. The current facility plan for the
District proposes to construct various improvements within the next 5-10 years to maintain
system reliability, and to accommodate projected growth demands. The District has sufficient
revenues and reserves to provide adequate services to the area for existing and future customers.
At some undetermined future time, purchase of additional Metro capacity may be required.
The Alpine Sanitation District was formed in 1952 to provide for sewer collection and
conveyance for portions of the unincorporated community of Alpine. The District maintains 21
miles of sewer collection and transmission facilities and two pump stations. Wastewater facility
and capital improvement plans are updated approximately every 5-10 years. A review of these
plans indicates that projected annual wastewater flows could increase from 0.5 million gallons
per day (mgd) in 2005 to approximately 1.5 mgd by the year 2020. The current facility plan for
the District proposes to construct various improvements within the next 5-10 years to maintain
system reliability, and to accommodate projected growth demands. The estimated cost for these
improvements is approximately $1.4 million. The District has sufficient revenues and reserves
to provide adequate services to the area for existing and future customers. At some
undetermined future time, purchase of additional Metro capacity may be required.
The Pine Valley Sanitation District was formed in 1968 to provide for sewer collection and
treatment for portions of the unincorporated community of Pine Valley. The District maintains
0.4 mile of sewer collection facilities. Wastewater facility and capital improvement plans are
updated on an as needed basis due to the District’s small size and limited customer base. At the
present time, the District has no plans to expand sewer services in the Pine Valley area. A
proposed development in the area, if approved, would require annexation for extension of sewer
service. Any extensions would be financed by the developer, otherwise facility needs will be
confined to existing or future operational requirements.
103
The Julian Sanitation District was formed in 1945 to provide for sewer collection and
conveyance for portions of the unincorporated community of Julian. The District maintains 2.8
miles of sewer collection and transmission facilities and one pump station. Wastewater facility
and capital improvement plans are updated on an as needed basis due to the District’s small size
and limited customer base. At the present time, the District has no plans to expand sewer
services in the Julian area. Facility needs will be confined to existing or future operational
requirements.
The Winter Gardens Sewer Maintenance District was established in January, 1964 to provide
sewer collection service to the Winter Gardens area, located between Lakeside to the east, Santee
to the west and El Cajon to the south. Winter Gardens SMD contracts with Metro for sewage
treatment/disposal. The Metro agreement provides for 1.3 mgd of capacity rights. Present flows
average 0.88 mgd with approximately 3,700 connected EDUs (3,340 residential EDUs; 360
commercial EDUs). The District’s current population is approximately 9,700. Future land uses
within the area are governed by the Lakeside Community Plan. Winter Gardens SMD is close to
built- out with little area remaining for future growth.
The Campo Water and Sewer Maintenance District was formed in May 2007. Water and sewer
service is provided to Campo Hills, a 220 residential subdivision. There are also about 45 private
customers in Rancho Del Campo and several County departments who have offices/facilities in
the area. This includes the U.S. Department of Homeland Security - Border Patrol Station.
The Rancho Del Campo (RDC) Water Pollution Control Facility (WPCF) has an average flow of
50,000 gallons per day (gpd). The treatment plant and sewer collection system serves both
Rancho Del Campo Community and Campo Hills Development which consists of approximately
315 EDUs. The Rancho Del Campo WPCF is a secondary treatment plant with processes
consisting of an Imhoff tank, a trickling filter, two secondary clarifiers, four percolation beds,
anoxic tanks and a sludge drying bed. The facility permitted effluent discharge is 114,000
gallons per day. Both the collection system and treatment plant are adequate to provide service
for existing customers.
The Harmony Grove Sewer Maintenance District was established in April 2007; however, no
development has occurred to date. The developer of the proposed community will construct
wastewater collection, treatment, and disposal facility, and upon acceptance of completed
improvements, the District will assume responsibility for future operations and
maintenance. Planning Area 1 of the adopted Specific Plan includes a wastewater reclamation
facility to be located on a nine-acre site. In general, the facilities will consist of the plant and an
adjacent wet weather storage reservoir. The plant will produce reclaimed water for the irrigation
of parks, parkways, major slope banks and other common area landscaping. When the Harmony
Grove Village project is fully occupied, the wastewater treatment facility will receive an average
104
daily flow of 0.20 million gallons per day (mgd), and a projected peak flow of 0.71 mgd. The
future and probable demand is established by the Harmony Grove Village Specific Plan.
The East Otay Mesa SMD was established in June, 1999 to provide sewage collection services
for the unincorporated East Otay Mesa area. The East Otay Mesa Specific Plan has designated
the area for commercial/industrial development. At present, the backbone sewer system consists
of one sewer outfall which was constructed to accommodate a recently built electrical generating
station. The power plant has been constructed. Other facilities are planned which will be
constructed as development occurs. There are also four other customers currently connected to
the system including Pilot Travel Center, Fedex Ground Shipping Center, a Sheriff’s Substation
and a restaurant.
There are currently 407 EDU’s generating approximately 114,000 gpd. It is anticipated
additional projects will come on-line over the next 5-10 years. The maintenance district is within
the Otay Community Planning Area.. The East Otay Mesa Specific Plan, which governs the area,
provides further information regarding proposed development. The District has 1.0 mgd of Metro
treatment/disposal capacity which is sufficient for the immediate future. Extensive
industrial/commercial development would require the acquisition of additional capacity.
(4) The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
Social or economic considerations that could affect the sphere of influence boundary
determination for the San Diego County Sanitation District were not identified during the course
of this review.
105
STATEMENT OF DETERMINATIONS
ZERO SPHERE OF INFLUENCE FOR THE
LAKESIDE SANITATION DISTRICT
The following statement of determinations is prepared pursuant to Section 56425 of the
Government Code for a zero sphere of influence designation for the Lakeside Sanitation District.
A zero sphere of influence is a transitional designation which indicates another agency will
ultimately assume responsibility for services. The Lakeside Sanitation District, along with four
other county sanitation districts and five maintenance districts, is proposed to be included in the
“San Diego County Sanitation District” jurisdictional boundary and sphere of influence. The
reorganized district is not proposing to expand or reduce the areas that receive service or change
the type and level of service currently being provided to existing or future customers.
(1) The present and planned land uses in the area as determined by existing and proposed
general plan land use designations.
The Lakeside Sanitation District, which is proposed to be included in the San Diego County
Sanitation District, encompasses approximately 7.9 square miles, and includes a variety of land
use designations consisting primarily of residential, commercial and limited industrial
developments. The District is bordered by/or within the sphere of influence of the cities of El
Cajon and Santee, Padre Dam MWD and the Winter Gardens Sewer Maintenance District (which
is also proposed to be part of the San Diego County Sanitation District). The Lakeside Water
District and Helix Water District also adjoin (or overlap) the District.
The County of San Diego is currently considering changes to the Lakeside Community Plan as
part of the General Plan Update. The present and planned land uses in the area will not be
affected by a zero sphere of influence determination as the County Board of Supervisors will
continue to be responsible for all decisions associated with the adoption of the General Plan
Update.
(2) The present and probable need for public facilities and services in the area.
The San Diego County Sanitation District is proposed to assume the services provided by the
Lakeside Sanitation District. The present and probable need for public facilities and services will
not be affected by the adoption of the zero sphere of influence. The Lakeside Sanitation District
was formed in 1955 to provide for sewer collection and conveyance for the unincorporated
community of Lakeside. The District maintains 73 miles of sewer collection and transmission
facilities and two pump stations. Wastewater facility and capital improvement plans are updated
approximately every 5-10 years. A review of these plans indicates that projected annual
wastewater flows will increase from 2.5 million gallons per day (mgd) in 2005 to approximately
106
4.3 mgd by the year 2020. The current facility plan for the District proposes to construct various
improvements within the next 5-10 years to maintain system reliability, and to accommodate
projected growth demands. The District has sufficient revenues and reserves to provide adequate
services to the area for existing and future customers. At some undetermined future time,
purchase of additional Metro capacity may be required.
The present and probable need for sewer service will not changed with the adoption of a zero
sphere of influence.
(3) The present capacity of public facilities and adequacy of public services which the
agency provides or is authorized to provide.
The District relies on the City of San Diego Metro system for treatment and disposal of
wastewater generated within its service area. The District’s agreement with Metro provides for
4.1 mgd of Metro capacity rights with approximately 2.5 mgd of current flow. Therefore,
sufficient capacity and facilities are available to support current and future needs of the District.
The San Diego County Sanitation District will continue to retain the Lakeside share of capacity
in the Metro system.
(4) The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
There are no social or economic considerations which would effect a zero sphere of influence
boundary determination for the Lakeside Sanitation District.
107
STATEMENT OF DETERMINATIONS
ZERO SPHERE OF INFLUENCE FOR THE
ALPINE SANITATION DISTRICT
The following statement of determinations is prepared pursuant to Section 56425 of the
Government Code for a zero sphere of influence boundary for the Alpine Sanitation District. A
zero sphere of influence is a transitional designation which indicates another agency will
ultimately assume responsibility for services. The Alpine Sanitation District, along with four
other county sanitation districts and five maintenance districts, is proposed to be included in the
“San Diego County Sanitation District” jurisdictional boundary and sphere of influence. The
reorganized district is not proposing to expand or reduce the areas that receive service or change
the type and level of service currently being provided to existing or future customers.
(1) The present and planned land uses in the area as determined by existing and proposed
general plan land use designations.
The Alpine Sanitation District, which is proposed to be included in the San Diego County
Sanitation District, encompasses approximately 1.4 square miles, and includes a variety of land
use designations consisting primarily of residential, commercial and limited industrial
development. The District not bordered by or within the sphere of influence of another sewer
agency, but is overlapped by the Padre Dam MWD which provides domestic water service to the
Alpine area.
The County of San Diego is currently considering changes to the Alpine Community Plan as part
of the General Plan Update. The present and planned land uses in the area will not be affected by
a zero sphere of influence determination as the County Board of Supervisors will continue to be
responsible for all decisions associated with the adoption of the General Plan Update.
(2) The present and probable need for public facilities and services in the area.
The District was formed in 1952 to provide for sewer collection and conveyance for portions of
the unincorporated community of Alpine. The District maintains 21 miles of sewer collection
and transmission facilities and two pump stations. Wastewater facility and capital improvement
plans are updated approximately every 5-10 years. A review of these plans indicates that
projected annual wastewater flows could increase from 0.5 million gallons per day (mgd) in
2005 to approximately 1.5 mgd by the year 2020. The current facility plan for the District
proposes to construct various improvements within the next 5-10 years to maintain system
reliability, and to accommodate projected growth demands. The estimated cost for these
improvements is approximately $1.4 million. The District has sufficient revenues and reserves
108
to provide adequate services to the area for existing and future customers. At some undetermined
future time, purchase of additional Metro capacity may be required.
The present and probable need for sewer service will not changed with the adoption of a zero
sphere of influence.
(3) The present capacity of public facilities and adequacy of public services which the
agency provides or is authorized to provide.
The District relies on the City of San Diego Metro system for treatment and disposal of
wastewater generated within its service area. The District’s agreement with Metro provides for
0.72 mgd of Metro capacity rights with approximately 0.5 mgd of current flow. Sufficient
capacity and facilities are available to support current and future needs of the District. However,
at some undetermined future time, purchase of additional Metro capacity may be required.
The San Diego County Sanitation District will continue to retain the Lakeside share of capacity
in the Metro system.
(4) The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
There are no social or economic considerations which would effect a zero sphere of influence
boundary determination for the Alpine Sanitation District.
109
STATEMENT OF DETERMINATIONS
ZERO SPHERE OF INFLUENCE FOR THE
JULIAN SANITATION DISTRICT
The following statement of determinations is prepared pursuant to Section 56425 of the
Government Code for a zero sphere of influence designation for the Julian Sanitation District.
A zero sphere of influence is a transitional designation which indicates another agency will
ultimately assume responsibility for services. The Julian Sanitation District, along with four
other county sanitation districts and five maintenance districts, is proposed to be included in the
“San Diego County Sanitation District” jurisdictional boundary and sphere of influence.
The reorganized district is not proposing to expand or reduce the areas that receive service or
change the type and level of service currently being provided to existing or future customers.
The Julian Sanitation District has no excess capacity available for additional connections, and
Board of Supervisors Policy I-113 imposes strict limitations on new sewer hookups. Policy I-
113 will continue to be implemented by the reorganized district. There are no plans at this time
or in the foreseeable future to expand system capacity. A written statement from the affected
district specifying the function or classes of service provided was originally approved on
April 6, 2001 and ratified on June 11, 2007.
(1) The present and planned land uses in the area as determined by existing and proposed
general plan land use designations.
The Julian Sanitation District, which is proposed to be included in the San Diego County
Sanitation District, encompasses approximately 0.19 square mile, and includes land uses
consisting primarily of residential and commercial development. The District is not bordered by
or within the sphere of influence of another sewer agency, but is overlapped by the Julian
Community Services District which provides domestic water service to the central Julian area.
The County of San Diego is currently considering changes to the Julian Community Plan as part
of the General Plan Update. The present and planned land uses in the area will not be affected by
a zero sphere of influence determination as the County Board of Supervisors will continue to be
responsible for all decisions associated with the adoption of the General Plan Update.
(2) The present and probable need for public facilities and services in the area.
The District was formed in 1945 to provide for sewer collection and conveyance for portions of
the unincorporated community of Julian. The District maintains 2.8 miles of sewer collection
and transmission facilities and one pump station. Wastewater facility and capital improvement
plans are updated on an as needed basis due to the District’s small size and limited customer
110
base. At the present time, the District has no plans to expand sewer services in the Julian area.
Facility needs will be confined to existing or future operational requirements. The present and
probable need for sewer service will not changed with the adoption of a zero sphere of influence.
(3) The present capacity of public facilities and adequacy of public services which the
agency provides or is authorized to provide.
The District has no available treatment plant capacity to support additional growth in the area,
and there are no plans to upgrade system capacity. Some limited capacity remains to
accommodate septic system failures or to accommodate previous capacity commitments. The
assumption of service by the San Diego County Sanitation District will not affect existing
capacity in the conveyance system or wastewater treatment plan.
(4) The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
There are no social or economic considerations which would effect a sphere of influence
boundary determination for the Julian Sanitation District.
111
STATEMENT OF DETERMINATIONS
ZERO SPHERE OF INFLUENCE FOR THE
PINE VALLEY SANITATION DISTRICT
The following statement of determinations is prepared pursuant to Section 56425 of the
Government Code for a zero sphere of influence designation for the Pine Valley Sanitation
District. A zero sphere of influence is a transitional designation which indicates another agency
will ultimately assume responsibility for services. The Pine Valley Sanitation District, along with
four other county sanitation districts and five maintenance districts, is proposed to be included in
the “San Diego County Sanitation District” jurisdictional boundary and sphere of influence. The
reorganized district is not proposing to expand or reduce the areas that receive service or change
the type and level of service currently being provided to existing or future customers. A written
statement from the affected district specifying the function or classes of service provided was
originally approved on April 6, 2001 and ratified on June 11, 2007.
(1) The present and planned land uses in the area as determined by existing and proposed
general plan land use designations.
The Pine Valley Sanitation District, which is proposed to be included in the San Diego County
Sanitation District, encompasses approximately 28 acres, and includes land uses consisting
primarily of residential and commercial development. The District not bordered by or within the
sphere of influence of another sewer agency.
The County of San Diego is currently considering changes to the Pine Valley Community Plan
as part of the General Plan Update. The present and planned land uses in the area will not be
affected by zero sphere of influence determination as the County Board of Supervisors will
continue to be responsible for all decisions associated with the adoption of the General Plan
Update.
(2) The present and probable need for public facilities and services in the area.
The District was formed in 1968 to provide for sewer collection and treatment for portions of the
unincorporated community of Pine Valley. The District maintains 0.4 mile of sewer collection
facilities. Wastewater facility and capital improvement plans are updated on an as needed basis
due to the District’s small size and limited customer base. At the present time, the District has
no plans to expand sewer services in the Pine Valley area. A proposed development in the area,
if approved, would require annexation for extension of sewer service. Any extensions would be
financed by the developer, otherwise facility needs will be confined to existing or future
operational requirements.
112
The present and probable need for sewer service will not changed with the adoption of a zero
sphere of influence and transfer of service to the San Diego County Sanitation District.
(3) The present capacity of public facilities and adequacy of public services which the
agency provides or is authorized to provide.
The District has available treatment plant capacity to support additional sewer connections in the
area resulting from development approvals or failing septic systems.
(4) The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
There are no social or economic considerations which would effect a zero sphere of influence
boundary determination for the Pine Valley Sanitation District.
113