PUBLIC REVIEW DRAFT
2022 LODI MUNICIPAL SERVICE REVIEW AND
SPHERE OF INFLUENCE UPDATE
Prepared by the City of Lodi
Community Development Department
221 West Pine Street
Lodi, CA 95240
September 2022
TABLE OF CONTENTS
1. INTRODUCTION ...............................................................................................................1 -1
2. SPHERE OF INFLUENCE PLAN .......................................................................................... 2-1
3. INFRASTRUCTURE NEEDS AND DEFICIENCIES ................................................................... 3-1
4. GROWTH AND POPULATION PROJECTIONS .......................................................................4 -1
5. FINANCING CONSTRAINTS AND OPPORTUNITIES ............................................................... 5-1
6. COST AVOIDANCE OPPORTUNITIES .................................................................................. 6-1
7. OPPORTUNITIES FOR RATE RESTRUCTURING ................................................................... 7-1
8. OPPORTUNITIES FOR SHARED FACILITIES AND DETERMINATIONS OF DISADVANTAGED
UNINCORPORATED COMMUNITIES .................................................................................. 8-1
9. GOVERNMENT STRUCTURE OPTIONS .............................................................................. 9-1
10. EVALUATION OF MANAGEMENT EFFICIENCIES ................................................................ 10-1
11. LOCAL ACCOUNTABILITY AND GOVERNANCE ..................................................................1 1-1
12. REFERENCES ............................................................................................................... 12-1
CITY OF LODI
MUNICIPAL SERVICES REVIEW
TABLE OF CONTENTS
List of Figures
Figure 1-1 Planning Area. ....................................................................................... 1-2
Figure 1-2 Sphere of Influence ............................................................................... 1-4
Figure 1-3 Williamson Act Land .............................................................................. 1-6
Figure 1-4 General Plan Land Use Map ................................................................. 1-7
Figure 2-1 Sphere of Influence ............................................................................... 2-3
Figure 2-2 Recently Annexed Areas ....................................................................... 2-4
Figure 3-1 County Fire Districts, Lodi Fire Stations, and Hospitals ......................... 3-3
Figure 3-2 Lodi Police Department and Service Districts ........................................ 3-7
Figure 3-3 Public Services Map ............................................................................ 3-13
Figure 3-4 City Water Service Area ...................................................................... 3-15
Figure 3-5 Water, Wastewater, and Storm Drainage Systems. ............................. 3-15
List of Tables
Table 1-1 Land Use Acreages ............................................................................... 1-5
Table 2-1 SOI Land Use Acreages ........................................................................ 2-3
Table 2-2 Population Projections. .......................................................................... 2-6
Table 2-3 Employment Projections ........................................................................ 2-7
Table 3-1 Lodi Fire Stations and Equipment.. ........................................................ 3-4
Table 3-2 Lodi Fire Budget and Staffing ................................................................ 3-5
Table 3-3 Lodi Fire Response Times ..................................................................... 3-5
Table 3-4 Regional Crime Rates ........................................................................... 3-7
Table 3-5 Lodi Police Budget and Staffing. ............................................................ 3-9
Table 3-6 Lodi Police Response Times ............................................................... 3-10
Table 3-7 Lodi Library Budget and Staffing ......................................................... 3-12
Table 3-8 Public Water Systems ......................................................................... 3-14
Table 3-9 Total Water Supplies ........................................................................... 3-16
Table 3-10 Total Water Demand ........................................................................... 3-17
Table 3-11 Potable and Non-Potable Water Use ................................................... 3-21
Table 3-12 Water Supplies .................................................................................... 3-22
Table 3-13 Projected Water Supply ....................................................................... 3-23
Table 3-14 Water Supply Projects ......................................................................... 3-24
CITY OF LODI
MUNICIPAL SERVICES REVIEW
TABLE OF CONTENTS
Table 3-15 Collected Wastewater. .........................................................................3 -26
Table 3-16 Projected Wastewater Flows ...............................................................3 -27
Table 3-17 Storm Drain Data ................................................................................. 3-28
Table 4-1 Population Trends in San Joaquin County ............................................. 4-2
Table 4-2 Population and Household Trends in Lodi .............................................4 -2
Table 4-3 Population Projections ........................................................................... 4-3
Table 4-4 Growth in Households ...........................................................................4 -4
Table 4-5 Employment Growth Rate .....................................................................4 -5
Table 4-6 Projected Employees. ............................................................................ 4-6
Table 6-1 Summary of Service Providers ..............................................................6 -2
Table 7-1 Comparison of Utility Rates ...................................................................7 -2
Table 8-1 Shared Detention Basin and Park Facilities ...........................................8 -3
Table 10-1 Schedule for Service Review ............................................................... 10-1
j ii
1 INTRODUCTION
This Municipal Services Review (MSR) was prepared by the City of Lodi (the City) for the San
Joaquin Local Agency Formation Commission (LAFCo) in compliance with the 2000 Cortese
Knox-Hertzberg Act, which requires each LAFCo to prepare service reviews prior to establishing
or updating spheres of influence (SOI).
According to LAFCo policies, the purpose of an MSR is to evaluate the provision of services from
a comprehensive perspective and recommend actions, when necessary, to promote the effi
cient provision of those services. This MSR must define the probable 30-year boundary of its
service area and the agency's sphere horizons at the end of the 10 and 30-year time period co
ordinated with this MSR.
In 2007, LAFCo approved the existing MSR and Sphere of Influence for the City of Lodi. This
2007 MSR included recently added annexations from 2006 and 2007. After this approval, the
City of Lodi approved the 2010 General Plan. The 2010 General Plan identifies land to provide
for potential growth during the next 20 years and beyond. Figure 1-2: SOI below, is a map
showing the existing SOI and City limit boundaries, the 2010 Lodi General Plan boundaries. The
10-year sphere horizon and the thirty-year sphere horizon boundaries are provided in section B.
Sphere of Influence below.
A. Planning Area
State law allows cities to identify a Planning Area. This is an area outside of city boundaries and
generally outside the SOI that bears a relation to the City's planning and policy direction.
The City of Lodi Planning Area covers 79.4 square miles, or 50,827 acres. This land area is domi
nated by vineyards and agriculture. Development in the Planning Area is concentrated in the
urbanized areas: within Lodi city limits and Woodbridge, a community contiguous to Lodi and
within Lodi's SOI; and in Flag City, an unincorporated commercial center at the junction of 1-5
and SR-12. (See Figure 1-1 below)
1-1
Figure 1-1: Planning Area
• 1
.
EB
1-2
B. Sphere of Influence
The Sphere of Influence (SOI) is the area outside of the City limits that the City expects to annex
and urbanize in the future. It is the expected physical limit of the City based on the most cur
rent information.
Figure 1-2 illustrates the current City limits and the existing SOI, as well as the proposed areas
for the 10-Year and 30-Year Horizons. The boundaries of the 10-year horizon will be expanded
to include the Phase I areas in the south-east quadrant which is generally bound by East Ket
tleman Lane to the north, East Hogan Lane to the south, Central California Traction Company
Railroad (CCTRR) to the east, and Golden State (Hwy 99) to the west. The boundaries of the 30-
year horizon will be expanded to include the Phase II areas in the south-east quadrant.
1-3
Figure 1-2: Spere of Influence
"
...
�nd
::a:a::a::Pro,omSOI
c:JWO(X)BRl)GE
liailODI
a;;;;;;;;lei,linll
CJ 10V.r90f
LJ3DV.rSOI
... --
0 Q26 0.5 , .................. , ...
1-4
Table 1-1 presents the acreages of each planned land use, based on General Plan land use des
ignations, within the existing City limits, and within the existing SOI and proposed SOI.
Table 1-1: Land Use Acreages
Overall Acreage Calculations
I
I' City Existing Proposed Total
!
Limits SOI SOI Acres
LDR Low Density Residential 2911.5 893.1 3804.6
MDR Medium Density Residential 470.5 166.6 637.0
HDR High Density Residential 208.5 13.1 221.5
C Commercial 406.1 52.4 162.1 620.6
0 Office 92.6 18.9 111.5
I Industrial 1183.2 104.4 242.1 1529.7
BP Business Park 396.0 396.0
OS Open Space 310.8 164.5 51.2 526.6
PQP Public/Quasi-Public 6.7 38.4 45.2
DMU Downtown Mixed Use 89.3 89.3
MC Mixed Use Corridor 466.7 34.0 500.7
w Water 67.0 67.0
Total Acres 6212.9 1485.4 851.4 8549.6
Source: City of Lodi, Engineering Department, GIS Division
1-5
......
Cl'\
.....:: .r--r , ,-: •t :_,;:.:: :r ," ;:_; � H -. � t ,;:: :; : .� :.; ;, : j ..
·i
! .:' ,, •·- . . . ...- � _,p-• .: .. .:: .., .. ,, . < · ,, .. I-.• ,;,.. p. :-;/" ......� .:· -., .. ' r.;7. ; , -. \ • •t': ;:· ... ... :. . .·:J. "" .� � ,:.r ·.(" , , • · •;, -�"i ;,� a � : :..- " , .. . l' �:;"" - - - .. .. -..t.7"' ... _ _ ,.. . _ _. ..,.. ._ ...,.. ..... _ _ _ _ """ :-,. _ L � - - .i,. _ __. ,._,.. _
l:df."� :·-•" ,.\. ��, -;.._; : ...i .. ,I""
'·if
:t;
... '
, ·. . : , .;-: . .:..:. __ , - ' ,. . :. , v . :, 1--., ;
· 1 ;;:�· G: ��--..,. c: .. �-'..A ·--- �D------ -'-��- �)r"' " · 1
I'
I
I
t
t
•I 'Tl
:I (iQ
C
'
;;;
,t ....
It
1 I - - � I
,
,, �
iii'
3
CII
0
::s
....�
Iii'
::s
0.
CII
::s....
�
ti)"'
iii"
::s
2::s.
O'Q l> --·t . . 'f.½f1 ¥::�Ji:fl 1 ;;;
.J-..-1--- -· ----J i ··'.;.-:>, x, ;,, •,: - .�:.�- - :,- . . - � - l; . : - ,,'. ' · . • ,. ; . :: : ,. ¾ � • ! � .. ;' .,,.t / ;:' ·) ) - • • . f l - ., ,. , , p , ' .. , ' .:A· OJ
I :. • ;.,.,._.. cl •-:--.1.•-1:·l¼ z.,. ··:rt.-;• ·.:.·•�;..::-r-,•t�v-:-:·:�·�·; -�-�:·.�;i
c::J c:::::J
Prime �armland l.kban DMOIJll IJt Pl1nnngkea
c:::::J c:::::J
State.1dE':lmpoltlr-.:e (lhe, llllld 5phl!II! rt 1nnuence
c:::::J
Local tmpcttanl! lllJII \ltllllam10n kt Oty Lln1lt1
-Unique �arn1lard -"•1lllamson Act,Non�ene...11
c::::J GmfnQ -�•nnlard Sec1111ry lore
Figure 1-4 illustrates the City of Lodi General Plan Land Use Map for the entire Planning Area,
including the City and SOI boundaries.
Figure 1-4: General Plan Land Use Map
1-7
This 2022 MSR and SOI plan will modify the existing SOI to include an area in the south-east
quadrant of the 2010 Lodi General Plan {see Figure 1-2) for economic and jobs growth which is
designated Commercial, Business Park and Industrial in the 2010 Lodi General Plan.
The Cortese-Knox-Hertzberg Act requires LAFCO to make nine written determinations. Follow
ing the SOI plan in Chapter 2, this MSR dedicates a chapter to each of these determinations in
the order listed below.
♦ Infrastructure Needs and Deficiencies
♦ Growth and Population Projections for the Affected Area
♦ Financing Constraints and Opportunities
♦ Cost Avoidance Opportunities
♦ Opportunities for Rate Restructuring
♦ Opportunities for Shared Facilities and Determinations of Disadvantaged Unincorporated
Communities
♦ Government Structure Options
♦ Evaluation of Management Efficiencies
♦ Local Accountability and Governance
C. LAFCo and the Sphere of Influence
Government Code Section 56076 defines a SOI as a "plan for the probable physical boundaries
and service area of a local agency, as determined by the Commission." An SOI is an area within
which a city or district may expand through the annexation process. In simple terms, an SOI is a
planning boundary within which a city or district is expected to grow over time.
In determining a sphere of influence, the Commission is required to consider and make written
determinations with respect to the following factors {Government Code Section 56425):
1. The present and planned land uses in the area, including agricultural and open space lands.
2. The present and probable need for public facilities and services in the area.
3. The present capacity of public facilities and adequacy of public services that the agency pro
vides or is authorized to provide.
4. The existence of any social or economic communities of interest in the area if the Commis
sion determines that they are relevant to the agency.
1-8
5. For an update of a sphere of influence of a city or special district that provides public facili
ties or services related to sewers, municipal and industrial water, or structural fire protec
tion, which occurs pursuant to subdivision (g) on or after July 1, 2012, the present and
probable need for those public facilities and services of any disadvantaged unincorporated
communities within the existing sphere of influence.
The purpose of a SOI is to encourage "logical and orderly development and coordination of lo
cal governmental agencies so as to advantageously provide for the present and future needs of
the county and its communities." SOI serves a similar function in LAFCo determinations as gen
eral plans do for cities and counties.
In order to prepare or update a SOI, a MSR must be conducted which addresses the nine factors
previously outlined. LAFCo must conduct the MSR and adopt written determinations with re
spect to those nine factors either prior to, or in conjunction with, any action to establish or up
date a SOI. Adopted LAFCo policies emphasize the use of existing plans, data and information
currently available for the preparation of MSR documents rather than requiring preparation of
new service documents.
D. California Environmental Quality Act
The LAFCO procedures for CEQA compliance are authorized by Section 21083 of the California
Public Resources Code which requires that the Secretary of the Resources Agency to adopt
guidelines for the implementation of the California Environmental Quality Act of 1970 (CEQA)
by public agencies. The guidelines which have been adopted, are set forth in the California Code
of Regulations (Chapter 3, Title 14 Sections 15000, et. seq.) Section 15022 of the guidelines re
quires that each public agency adopt objectives, criteria, and specific procedures for adminis
tering its responsibilities under CEQA. The purpose of these regulations is to comply with the
requirements of Section 15022. This MSR has been completed in full compliance with CEQA
and LAFCO procedures.
Because this MSR is an informational document used for future actions that LAFCo or the City
have not approved, adopted or funded, it is considered to be statutorily exempt from the Cali
fornia Environmental Quality Act (CEQA) pursuant to Section 15262 of the CEQA Guidelines. A
notice of exemption pursuant to CEQA will be prepared by LAFCo.
Additionally, the Lodi City Council certified the Environmental Impact Report (EIR), State Clear
inghouse No. 20009022075, for the City of Lodi 2010 General Plan on April 7, 2010. The EIR
was certified by Resolution No. 2010-41. All lands within the proposed boundaries of the SOI
are designated for urbanization by the General Plan and no changes to the current General Plan
designations are proposed. The action of approving the MSR and adopting the proposed SOI
will not result in any approvals of a project that would have the potential to result in impacts to
the environment. Nor would approving the MSR and adopting the SOI result in any changes to
1-9
the planned and allowed density and/or intensity of future land uses. It can be seen with cer
tainty that approving the MSR and adopting the proposed SOI do not have the potential to re
sult in impacts to the environment and therefore these actions are exempt from review under
CEOA subject to Section 15183 of the CEOA Guidelines. The City of Lodi will prepare a Notice of
Exemption for LAFCo to consider in conjunction with its review of the MSR and SOI.
1-10
2 SPHERE OF INFLUENCE PLAN
The Sphere of Influence (SOI) Plan for the City of Lodi described in this chapter analyzes the City's
ability to serve existing and future residents within the proposed SOI. LAFCo is responsible for
the sufficiency of the documentation and the Plan's consistency with State law and LAFCo policy.
This SOI plan has been completed in compliance with all applicable LAFCo policies as prescribed
by the state legislature to:
1. Promote orderly growth and urban development.
2. Promote cooperative planning efforts among cities, the county and special districts to address
concerns regarding land use and development standards, premature conversion of agricul
ture and open space lands, efficient provision of services, and discouragement of urban
sprawl.
3. Serve as a master plan for future local government reorganization by providing long range
guidelines for efficient provision of public services.
4. Guide consideration of proposals and studies for changes of organization or reorganization.
5. For cities and special districts that provide public facilities or services related to sewers, mu
nicipal and industrial water, or structural fire protection, the present and probable need for
those public facilities and services within any disadvantaged unincorporated communities
(DUCs) within the sphere of influence.
According to Government Code 56425 of the Cortese-Knox-Hertzberg Act, LAFCo must consider
and prepare determinations for the following five factors.
1. The present and planned land uses in the area, including agricultural open space lands.
2. The present and probable need for public facilities and services in the area.
3. The present capacity of public facilities and adequacy of public services that the agency pro
vides or is authorized to provide.
4. The existence of any social or economic communities of interest in the area if the Commis
sion determines that they are relevant to the agency.
5. For an update of a sphere of influence of a city or special district that provides public facili
ties or services related to sewers, municipal and industrial water, or structural fire protec
tion, that occurs pursuant to subdivision (g) on or after July 1, 2012, the present and prob
able need for those public facilities and services of any disadvantaged unincorporated com
munities within the existing sphere of influence.
2-1
LAFCo guidelines for determining SOI requires that "sphere horizons," or planning increments,
depict a city's logical boundaries at time periods of between five and ten years, and up to thirty
years. SOI areas must be consistent with general plan land use elements, and with the munici
pal services review {MSR). LAFCo also encourages general plan policies for implementing ordi
nances and programs that address smart growth principles, infill and redevelopment strategies,
mixed use and increased densities, community buffers, and conservation of habitat, open
space, and agricultural land.
LAFCo has established procedural guidelines for determining SOis, including a Timeframe guide
line which states "Territory that is currently receiving services from a local agency, or territory
that is projected to need a local agency's services within a 0-30-year timeframe may be consid
ered for inclusion within an agency sphere. "Sphere horizons" or planning increments should
depict the agency's logical boundary at a time period of between 5 and 10 years and at the end
of the 30-year time period."
Detailed determinations as to the City's ability to provide adequate services to existing and fu
ture residents within the existing SOI are contained in the subsequent chapters of this MSR.
1. Sphere of Influence
The current and proposed Sphere of Influence (SOI) are identified on Figure 2-1. This figure also
identifies areas of the existing and proposed SOI that are defined as 10-year SOI and 30-year SOI.
The City has estimated the available capacity for residential and non-residential development
inside the City limit and in the proposed SOI. Development potential is calculated based on as
sumptions of new commercial and residential development that could be built under the General
Plan land use designation and densities/intensities. These assumptions enable calculation of pro
jected population and employment and allow the City to plan for growth and infrastructure ac
cordingly.
► 10 Year SOI represents a reasonable level of development given current market conditions
and historic development trends. This SOI includes approved and under construction devel
opment projects; infill development and redevelopment downtown, along the City's major
corridors, and in the current and proposed SOI.
► 30 Year SOI represents the next most contiguous areas that will be made available once the
land area depicted in the 10 Year SOI has been largely built out.
The only proposed amendment to the current Lodi Soi is the addition of the East Study Area that
includes 851 acres of land which is generally bound by East Kettleman Lane to the north, East
Hogan Lane to the south, Curry Avenue to the east, and Highway 99 to the west.
2-2
Figure 2-1: Proposed SOI
__
�nd
,..
1:.1...,.._
1::1:�
c:JI0-1101 -i- ......__ .....-- - - -rL- - -1 D ,. _ .,.
J
�@,
•�"--,-L�,
Table 2-1: SOI Land Use Acreages
Overall Acreage Calculations
City Existing Proposed Total
Limits SOI SOI Acres
LOR Low Density Residential 2911.5 893.1 3804.6
MDR Medium Density Residential 470.5 166.6 637.0
HDR High Density Residential 208.5 13.1 221.5
C Commercial 406.1 52.4 162.1 620.6
0 Office 92.6 18.9 111.5
I Industrial 1183.2 104.4 242.1 1529.7
BP Business Park 396.0 396.0
OS Open Space 310.8 164.5 51.2 526.6
PQP Public/Quasi-Public 6.7 38.4 45.2
DMU Downtown Mixed Use 89.3 89.3
MC Mixed Use Corridor 466.7 34.0 500.7
w Water 67.0 67.0
Total Acres 6212.9 1485.4 851.4 8549.6
Source: City of Lodi, Engineering Department, GIS Division
Note: Table 2.1 acreages include the Woodbridge community, which is designated predominantly
residential and, while located in the Lodi SOI, is not anticipated for annexation to the City.
2-3
2. City and SOI Capacity
2006 and 2007 Annexed Areas
The Reynold's Ranch, Westside and Southwest Gateway projects were annexed into the City in
2006 and 2007, Due to the economic downturn that extended from 2008 through 2014, devel
opment of these projects was significantly delayed. However, over the past seven years much of
this land has been developed and the City is nearing build out of residential lands inside the City
limits. The undeveloped portions of previously annexed properties and underutilized vacant
properties within the City Limits are estimated to have capacity to accommodate approximately
1,000 dwellings.
Figure 2-2: Recently Annexed Lands
Residential Capacity
Figure 2-1 identifies the existing City limits and the existing and proposed Lodi SOI. The remaining
undeveloped lands in recent annexations, combined with the potential for infill development and
densification in the existing community, are assumed to be able to accommodate approximately
1,000 new dwellings.
2-4
The Lodi 2010 General Plan estimates residential lands in the current SOI can accommodate ap
proximately 4,400 dwelling units. A review of current General Plan residential designations within
the existing Lodi SOI indicate the 2010 General Plan likely overestimated the development ca
pacity in the existing SOI. This may be a result of Woodbridge community lands being included in
the estimates, land that are not considered likely to annex to the City. For this analysis develop
ment capacity in the existing SOI is assumed to range from 3,800 to 4,400 dwellings. Combined
with capacity inside the current City limits, residential development capacity is assumed to be
4,800 to 5,400 dwellings for the City limits plus SOI.
The General Plan assumes 2.7 persons per household to generate population estimates. The
most recent American Community Survey/US Census data assumes 2.85 persons per household
overall for the City and this more current household size is used in this analysis.
Based on the capacity to accommodate approximately 1,000 dwelling inside existing City limits
and between 3,800 and 4,400 dwellings in the existing SOI, the City has a combined capacity to
accommodate 4,800 to 5,400. Assuming 2.85 persons per household, these dwelling could ac
commodate 13,700 to 15,400 new residents. The City is not proposing any additions of residen
tial lands to its SOI.
Non-Residential Capacity
Table 2-4 summarizes the overall acreage calculations by land use, within the city limits, existing
SOI, and proposed SOI. Industrial and commercial represent the largest non-residential land uses,
with proposed development concentrated in the area identified as the East Study Area. The ma
jority of industrial land in Lodi is located east of Highway 99 and north of Kettleman Lane. It is
estimated there are approximately 150 acres of undeveloped industrial lands north of Kettleman
and east of Highway 99.
The East Study Area includes a total of 851 acres, of which 51 acres is the Cherokee Memorial
Cemetery that will not be available for development. Portions of the remaining 800 acres are
currently developed as residential uses or as agricultural industrial uses that will limit the poten
tial for developing employment generating uses for the foreseeable future.
The Lodi General Plan designates lands in the East Study Area for urban uses. The Cemetery is
designated Open Space and the remaining lands are designated Business Park (396 acres), Com
mercial (162 acres) and Industrial (242 acres).
The City conducted an analysis of employees per acre in the City of Lodi and in San Joaquin
County. The review was compared to analysis prepared by the Southern California Association of
Governments studies to validate assumptions. Based on this analysis it is anticipated that em
ployment generating uses in the East Study Area will generate an average of 6.47 employees per
gross acres across the entire East Study Area. Based on 800 total available acres, it is estimated
2-5
the East Study Area could accommodate approximately 5,200 new employees. The vacant 150
acres of industrial land north of Kettleman Lane are estimated to provide capacity of an additional
970 employees, resulting in a total capacity of approximately 6,200 employees. There is also ca
pacity for additional employment uses as infill within the City that are anticipated to be primarily
retail and service oriented uses.
3. Development Projections
Residential Projections
Lodi has developed at a relatively consistent rate over the years and has developed in a logical
and compact form with a balance of land uses. The City intends to maintain these growth char
acteristics of moderate rate and orderly growth over both the 10-year and 30 year planning ho
rizons. Over the past forty years Lodi population has grown at a rate of between lpercent and
1.5 percent annually, with limited periods of both slower and more rapid growth. For purposes
of SOI planning, the City anticipates a population growth rate of 1.5 percent annually. Table 2-2
notes five-year population projections from 2022 through 2052 based on a 1.5 percent growth
rate, beginning with an estimated 2019 population of 67,581. This growth rate represents a mid
dle ground between Lodi's historical growth rate of 1 percent and the maximum growth rate of
2 percent allowed by the General Plan.
Table 2-2 Population Projections
Year Population
2019 67,581
2020 68,595
2021 69,521
2022 70,459
2027 75,345
2032 80,570
2037 86,158
2042 92,133
2047 98,522
2052 105,354
The City's 10-year population is expected to increase by 10,111, reaching a population of 80,570
by 2032. By comparison, the City's 30-year population is projected to increase by 34,895 resi
dents, reaching a population of 105,354 by 2052.
2-6
Non-Residential Projections
Lodi's economic base has historically been concentrated on agriculture and manufacturing. Agri
culture and manufacturing businesses have been attracted by the city's access to transportation
routes and facilities as well as a location that is central to the markets of the western United
States. Today, tourism is a growing sector of the basic economy as well: visitors are attracted
primarily by Lodi's premium wine industry.
The 2010 General Plan seeks to provide balanced land uses that generate adequate revenue to
pay for the cost of services provided. A combination of office, retail, and visitor's services and
attractions, provide a range of jobs for local workers and revenue streams for the City govern
ment. The new growth areas provide land for potential large employment opportunities, similar
to the Blue Shield call center for industrial users. Highway adjacent commercial designations may
attract commercial users who favor highway accessibility.
The City has designated the area east of Highway 99, East Study Area, as an expansion to the SOI
to accommodate business park, research and development, light industrial and similar employ
ment generating uses.
The City has analyzed total employment in the City, including an evaluation of jobs by sector, an
projected future employment that would be accommodated in the current City limits and the
proposed SOI. While employment growth has been steady in Lodi over the past several decades,
the rate has not been rapid. It is anticipated that future growth will continue at a pace of approx
imately 1 percent annually.
Table 2-3: Employment Projections
Projected
Year
Employees
2022 30,106
2027 31,642
2032 33,256
2037 34,952
2042 36,735
2047 38,609
2052 40,578
The City's 10-year employment is expected to increase by 3,150, reaching 33,256 jobs by 2032.
By comparison, the City's 30-year employment is projected to increase 10,472, reaching 40,578
jobs by 2052.
2-7
4. 10-Year and 30-Year SOI Capacity
10 year/30 year SOI -Residential
Based on the City's analysis residential development in the 10-year and the 30-year horizons are
projected to be:
10-year (2032) Horizon
• Total population: 80,570
• New residents: 10,111
30-year (2052) Horizon
• Total population: 105,354
• New residents: 34,895
Based on the City's analysis, the current City limits plus the current SOI has the capacity to ac
commodate between 13,700 to 15,400 new residents.
Based on an assumed growth rate of 1.35 percent annually, the residential capacity in the City
limits and the current SOI can accommodate anticipated residential through year 2036 or year
2037, varying based on the assumed capacity of the SOI.
The current SOI is adequate to accommodate development in the 10-year planning horizon, but
changes to the City's General Plan land use designations or additional expansions of the City's
SOI will be required to accommodate development of the 30-year planning horizon.
The City is anticipating a comprehensive General Plan update in the next several years and long
term growth strategies will be considered in that planning process.
10 year/30 year SOI -Non-Residential
Based on the City's analysis non-residential development in the 10-year and the 30-year horizons
are projected to be:
10-year (2032) Horizon
• Total employment: 33,256
• New jobs: 3,150
30-year (2052) Horizon
• Total employment: 40,578
• New jobs: 10,472
2-8
Based on the City's analysis, the current City limits plus the current SOI has the capacity to ac
commodate non-residential development that would provide approximately 6,200 new jobs.
Based on an assumed growth rate of 1.0 percent annual job growth, the non-residential land
capacity in the City limits and the current and proposed SOI can accommodate anticipated non
residential development through year 2041.
The current SOI is adequate to accommodate development in the 10-year planning horizon, but
changes to the City's General Plan land use designations or additional expansions of the City's
SOI may be required to accommodate development of the 30-year planning horizon.
With regards to non-residential development, historic jobs-per-acre may vary with future growth
as Lodi has attracted light industrial uses with employees-per-acre substantially higher than the
historic 6.47 employees-per-acre assumed in this analysis. Similar to residential capacity, the abil
ity to accommodate anticipate non-residential development will be considered a future General
Plan update and strategies to accommodate long-term employment growth will be established.
5. Determinations
This section includes the five determinations required by State law for SOi's. This sphere plan
proposes to change the existing SOI to include the 10-year horizon boundaries which will be ex
panded to include the Phase I areas in the south-east quadrant which is generally bound by East
Kettleman Lane to the north, East Hogan Lane to the south, Curry Avenue to the east, and Golden
State (Hwy 99) to the west, and the boundaries of the 30-year horizon which will be expanded to
include the Phase II areas in the south-east quadrant. The proposed SOI expansion areas are
identified within the General Plan as Commercial, Business Park, Industrial, and Open Space land
uses - +/- 851.4-acres. This area does not include any residential uses and will not generate
population growth directly, as this is an economic growth area for the City.
Written determinations are included for each of the required areas and are provided below. The
San Joaquin LAFCo "Service Review Policies" document dated December 14, 2012, prepared by
the San Joaquin LAFCo was used as a guide in the preparation of this MSR. The following deter
minations are based on a comprehensive review of services contained in this MSR. These deter
minations affirm the City's ability to provide services to existing and future populations within its
SOI in accordance with Government Code section 56425:
Determination 1: The present and planned land uses in the area, including agricultural open
space lands.
Present and planned land uses are appropriate for serving existing and future residents of Lodi.
The City of Lodi 2010 General Plan includes goals, policies, and implementing programs that ad
dress growth, gevelopment, and conservation of open space. Planned land uses in the Lodi 2010
2-9
General Plan include Low Density Residential, Medium Density Residential, High Density Residen
tial, Commercial, Business Park, Office, Downtown Mixed-Use, Mixed-Use Center, Mixed Use Cor
ridor, Industrial, Open Space, Public/Quasi-Public, and Urban Reserve. Land designations appli
cable to the 10 and 30-year horizons are identified within the General Plan as Commercial, Busi
ness Park, Industrial, and Open Space land uses -+/- 851.4-acres. This area does not include any
residential uses and will not generate population growth directly, as this is an economic growth
area for the City. (see Table 2-7).
As discussed in Chapter 1, the City is seeking to establish an area of interest which the City has
identified as the Armstrong Road Agricultural Cluster Study Area which involves the preservation
of prime agricultural lands and is located along the south edge of Lodi, from Interstate 5 (1-5) to
State Route (SR) 99, and south to Stockton's Planning Area boundary. The City of Lodi is not pro
posing to include this area within a sphere of influence. This area of interest is intended to main
tain a clear distinction between the Cities of Lodi and Stockton. In coordination with relevant
public agencies and property owners, the City will continue to study this area to determine a
strategy to meet this objective.
Determination 2: The present and probable need for public facilities and services in the area.
The City of Lodi provides adequate services to meet the needs of the existing population. Services
provided by the City include fire, police, water, wastewater, stormwater drainage, and electrical
utility. The City also provides public facilities including transportation, libraries, and recreational
facilities. New development within the SOI will lead to population growth and the need for ad
ditional service provision. The expanded tax base that results from new development, as well as
the continuation of the residential Community Facilities Districts, will provide funding for these
services. Development fees will address the capital cost of new development. General Plan pol
icies are in place to ensure adequate service provision for current and future populations.
Existing public facilities and services are adequate for serving the needs of Lodi's population.
Lodi's fire department has adequate staff and facilities to provide for existing populations and is
in the process of developing new facilities to better serve growing populations. Lodi's police
department has adequate staff and facilities. The City's water supply, wastewater and storm
drainage services meet the needs of current population and are currently being updated and
expanded to meet the needs of future populations. The determinations included in Chapter 3 of
this MSR show that public facilities and services are adequate to meet needs of current popula
tion and are being improved so as to meet needs of future populations.
Determination 3: The present capacity of public facilities and adequacy of public services that
the agency provides or is authorized to provide.
The determinations included in Chapter 3 this MSR show that public facilities and services are
adequate to meet the needs of the current population. In addition, public facilities and services
2-10
are being improved over time, and specific timeframes and policies have been established to
meet the projected demand from the City's future growth.
Determination 4: The existence of any social or economic communities of interest in the area if
the Commission determines that they are relevant to the agency.
As discussed in Chapter 1, the City is seeking to establish an area of interest which the City has
identified as the Armstrong Road Agricultural Cluster Study Area which involves the preservation
of prime agricultural lands and is located at along the south edge of Lodi, from Interstate 5 (1-5)
to State Route (SR) 99, and south to Stockton's Planning Area boundary. The City of Lodi is not
proposing to include this area within a sphere of influence. This area of interest is intended to
maintain a clear distinction between the Cities of Lodi and Stockton.
The existing SOI includes the community of Woodbridge, which is a social and economic commu
nity of interest for the City of Lodi, and Flag City, an unincorporated commercial center at the
junction of 1-5 and SR-12. The City of Lodi does not propose any change to its existing SOI in that
area and is not looking to annex any lands in that area. Flag city cannot be annex since it is not
contiguous to the City. Therefore, adjacent communities will not be impacted at this time.
Determination 5: For an update of a sphere of influence of a city or special district that provides
public facilities or services related to sewers, municipal and industrial water, or structural fire
protection, that occurs pursuant to subdivision (g) on or after July 1, 2012, the present and prob
able need for those public facilities and services of any disadvantaged unincorporated communi
ties within the existing sphere of influence must be analyzed.
SB 244 (Chapter 513, Statutes of 2011) made changes to the Cortese-Knox-Hertzberg Local Gov
ernment Reorganization Act related to "disadvantaged unincorporated communities." Disadvan
taged unincorporated communities are inhabited territories (containing 12 or more registered
voters) where the annual median household income is less than 80 percent of the statewide an
nual median household income.
Cortese-Knox-Hertzberg Local Government Reorganization Act Section 56375(a)(8)(A) prohibits
LAFCo from approving a city annexation of more than 10 acres if a disadvantaged unincorporated
community is contiguous to the annexation territory but not included in the proposal, unless an
application to annex the disadvantaged unincorporated communities has been filed with LAFCo
or if the Commission finds that a majority of the registered voters are opposed to annexation.
The legislative intent is to prohibit "cherry picking" by cities of tax-generating land uses while
leaving out under-served, inhabited areas with infrastructure deficiencies and lack of access to
reliable potable water and wastewater services. Disadvantaged unincorporated communities are
recognized as social and economic communities of interest for purposes of recommending SOI
determinations pursuant to Section 56425(c).
2-11
The Disadvantaged Communities Mapping tool maintained by the California Department of Wa
ter Resources {https://gis.water.ca.gov/app/dacs/) was reviewed and did not show any disad
vantaged communities within the proposed SOI.
There are two small clusters of homes in the East Study Area that qualify as Disadvantaged based
on income levels. One such cluster is comprised of nine homes and therefore is not considered a
Disadvantaged Community. A second area comprised of approximately 30 homes is located ad
jacent to Harney Lane. The City has proposed both of these clusters of homes be added to the
Lodi SOI and would be prepared to annex these homes should property owners desire to be
added to the City. Due to the limited number of homes the City has ample capacity to provide
municipal services to these properties.
2-12
3 INFRASTRUCTURE NEEDS AND DEFICIENCIES
The purpose of this section is to evaluate infrastructure needs and deficiencies for services pro
vided by the City of Lodi as they relate to current and future users. Infrastructure needs and
deficiencies will be evaluated in terms of supply, capacity, condition of facilities, and service
quality with correlations to operational, capital improvement, and finance plans.
This section of the MSR will address the provision of public services within the existing City
boundaries which include the annexed Reynold's Ranch project area and within the recently
approved annexation areas of the Westside and SW Gateway project areas, and the provision
of public services within the 10-year and 30-year horizon boundaries. The following services
are provided by the City of Lodi, and will be evaluated in this section:
♦ Fire Protection and Emergency Medical Services
♦ Law Enforcement
♦ Water Supply and Treatment
♦ Wastewater Collection and Treatment
♦ Stormwater Drainage
♦Electrical Utility
♦ Public Services (Libraries)
In order to approve a change in the SOI and annexation of land into the City of Lodi, LAFCO
must determine that the necessary infrastructure and public services exist to support the new
uses at comparable service levels. The information put forward in this MSR supports the City of
Lodi's requested 10-year and 30-year horizons.
A. Fire Protection and Emergency Medical Services
The Lodi Fire Department covers the city (12.69 square miles) from four fire stations: Fire Sta
tion 1 is located in the downtown area, Fire Station 2 is located on the eastside of Lodi, Fire Sta
tion 3 is located in the southwest section of town, and Station 4 is in the northwest section of
town. A fifth station has been contemplated to serve development in the southern portion of
the City but a specific location has not yet been identified. In addition, the City of Lodi Fire De
partment utilizes the State Master Mutual Aid System under CAL OES (Office of Emergency Ser
vices), which utilizes resources from municipal fire departments to provide fire protection
throughout the State.
3-1
The Lodi Fire Department Fire Prevention Division is responsible for enforcing the California Fire
Code under the direction of the Fire Marshal (Battalion Chief). The Fire Marshal evaluates,
schedules, and records all residential, commercial, industrial, and educational inspections. In
addition to building inspection the Fire Prevention Division issues fire operational permits and
special use permits for events. The City also has a mutual aid agreement with the Woodbridge
1
Fire Protection District, Stockton Fire Department, and Cosumnes Fire District.
The Fire Department provides a wide range of emergency and non-emergency services, includ
ing hazardous materials response, public education, and related safety services. The Emergency
Operations Center, located at the Police department building, serves as the center of the city's
emergency operations. The Lodi Police department is the primary public safety access point
(PSAP) for all 911 calls within the jurisdiction of Lodi. Fire and EMS calls for service are routed to
the Stockton Regional Dispatch Center (SRDC). Lodi, Stockton, Manteca, Lathrop-Manteca, and
South County Fire Authority are all dispatched from the SRDC. City operations remain in com
pliance with the National Incident Management System (NIMS), a comprehensive national ap
proach to incident management, applicable to federal, state, and local governments and the
Standardized Emergency Management System (SEMS), which provides a strategy and frame
work to address multi-agency and multijurisdictional emergencies in California.
The City of Lodi has adopted a resolution to abide by the California Disaster and Civil Defense
Master Mutual Aid Agreement. As shown in Figure 3-1, the Lodi Fire Department is bordered by
the Woodbridge, Mokelumne and Liberty Fire Protection districts. Lincoln and Waterloo
Morada Fire Protection Districts are also in proximity of the City. The Lincoln Fire District, how
ever, is served by the City of Stockton Fire Department under a contract agreement. The Lodi
Fire Department has established mutual aid agreements with the following fire districts in order
to increase cost effectiveness and efficiency in responding to emergencies in San Joaquin Coun
ty:
♦ Lathrop Manteca Fire District
♦ Woodbridge Rural Fire Protection District
♦ Ripon Consolidated District
♦ Mokelumne Fire Protection District
♦ Linden-Peters Rural County Fire Protection District
♦ Clements Rural Fire Protection District
♦ Escalon Consolidated Fire Protection District
1
Pacific Municipal Consultants, Lodi Shopping Center Draft Environmental Impact Report, prepared for the City of
Lodi, August 2004.
3-2
♦ Waterloo-Morada Fire District
♦ Thornton Fire Protection District
♦ Stockton Fire Department
♦ Farmington Fire District
♦ French Camp McKinley Fire District
♦ Manteca Fire Department
♦ Montezuma Fire District
♦ South County Fire Authority
Figure 3-1 County Fire Districts, Lodi Fire Stations, and Hospital
1. Existing Facilities and Services
Administrative offices of the Lodi Fire Department, including Fire Administration and Fire Pre
vention, are located at 210 W. Elm St. Fire Administration houses the Fire Chief, Deputy Chief
of Operations, Fire Marshal, Chief of Training, and Department Administration Assistants. The
Fire Prevention division includes the Fire Marshal, and Administrative Clerk. In addition to the
administrative office, the fire department operates four fire stations which are distributed
throughout the City. All of the fire stations are located within City boundaries. Table 3-1 shows
3-3
the location, equipment, and services provided at each location. Fire station locations are also
shown in Figure 3-3.
Table 3-1: Lodi Fire Stations and Equipment
Station Location Equipment
Battalion 2011,
Truck 2051,
1 210 W Elm Street Engine 2031, and
a reserve engine.
Engine 2032,
State of California Office of
Emergency Services
2 S Cherokee Lane (OES) Engine 338,
2
Hazmat 2081,
USAR Trailer,
Public Education Trailer, and
the Santa Fire Truck
Engine 2033 and
3 2141 S Ham Lane a reserve engine
180 N Lower Sacra
4 Engine 2034 and
mento Road
a reserve truck
Source: http://www.lodi.gov/fire/accessed 10/19/21.
The department is the City's second largest General Fund department with 56.6 positions and a
FY 2021-22 operating budget of $16,392,350. A summary of expenditures and staffing are
shown below in Table 3-2.
3-4
Table 3-2: Lodi Fire Budget and Staffing
·:1�.t.f� ::•···_. :'�;_:,··;�···.; ·. .� ·1-:��:\'��·'-i.-:� '
-���:�f.,;
"'
". :
::r:-.. �-· · ·:-· -.,.
· ..· ' 2020/21 2021/22 City
2018/19 2019/20 2020/21 Estimated Council
Fire Department Expenditure Summary Actuals Actuals Budget Actuals Adopted
71 • Salaries & Benefits 10,624,260 11,630,988 12,749,720 12,694,S30 13,944,010
72 • Supplies & Services 1,013,862 1,033,S98 989,260 1,014,260 1,272,940
74 -Insurances 122,085 262,320 267,900 267,900 320,400
n • Operating Transfers S19,180 839,180 640,750 640,7S0 85S,000
78 • capital Projects 0 11,984 0 0 0
Fire Department Total 12,279,386 13,778,069 14,647,630 14,617,440 16,392,350
:zma.19 2019-20 JOZC>-21 2121-22
Posiliolls l'Ollllons POlition5 Posillons
FIRE DEPARTMENT
Administrative Assistant 1.0 1.0 1.0 1.0
Deputy Fire Chief 1.0 1.0 1.0 1.0
Fire Battalion Chief 4.0 4.0 4.0 4.0
Fire Captain 16.0 16.0 16.0 16.0
Fire Chief 1.0 1.0 1.0 1.0
Fire Engineer 19.0 19.0 19.0 19.0
Firefighter 1/11 14.0 14.0 14.0 14.0
Management Analyst 0.6 0.6 0.6 0.6
Fire Department Total 56.6 56.6 56.6 56.6
2
The department received a total of 7,521 calls in 2021, averaging 28.4 calls per day. The Gen
eral Plan establishes a travel time goal of 3:00 minutes or less for emergency calls. Response
time, from receipt of call to arrival on site is described in Table 3-2.
Table 3-3: Lodi Fire Response Times
Call Processing Turn Out Response Total
Ave.1 90%2 Ave. 90% Ave. 90% Ave. 90%
Station 1 116 204 77 110 169 279 361 593
Station 2 116 204 71 88 186 285 373 577
Station 3 116 204 70 81 222 327 408 612
Station 4 116 204 74 106 213 334 403 644
1. Average time in seconds
2. Time in seconds to complete 90% of responses
2 R. Penix, City of Lodi Fire Department, 5/13/22.
3-5
2. Provisions for Future Growth and Systems Improvement
The Growth Management Element of the City's 2010 General Plan includes policies to ensure
that adequate fire personnel related facilities are funded and provided to meet future growth.
These policies include:
• GM-G4: Provide public facilities including police and fire services, schools, and libraries
commensurate with the needs of the existing and future population.
• GM-P27: Maintain sufficient fire and police personnel and facilities to ensure maintenance
of acceptable levels of service. Provide needed facilities concurrent with phased develop
ment.
In order to achieve continued compliance with the National Fire Protection Association's re
sponse time criteria of 6 minutes for 90% of all calls, the Fire Department expand operations
and construct new fire stations as appropriate to serve new development. Additional fire sta
tions will be proposed to address the ultimate sphere boundaries. The expanded tax base that
results from new development, as well as the continuation of the residential Community Facili
ties Districts, will provide funding for fire services. Development fees will address the capital
cost of new fire facilities and equipment.
B. Law Enforcement
1. Existing Facilities and Services
Police protection services in the City of Lodi are provided by the Lodi Police Department. The
Department has operated out of the Lodi Police Facility at 215 West Elm Street since the facili
ty's completion in February 2004. The facility includes 51,000 square feet for police and jail
services, and 8,000 square feet for future use by the San Joaquin County Superior Court. 3
The Lodi Police Department is divided into three districts, encompassing five geographical areas
or "patrol beats," as shown in Figure 3-2. The Sunset District's geographical borders are gener
ally east to Hutchins Street, north to city limits, west to the city limits, and south to city limits.
The Heritage District's geographical borders are generally west to Hutchins Street, north to the
city limits, east to the city limits and south to city limits but excluding the area of the Central
District. The Central District's geographical borders are generally west to Hutchins Street, north
to Elm Street, south to Vine Street and East to Cherokee lane.
3 City of Lodi Police Department, http://www.lodi.gov/police/index.htm, accessed on 10/19/21.
3-6
The department is divided into 2 divisions. The Operations Division responds to the majority of
calls for service and is made up of Patrol, Traffic, Parks, School Resource, Community Liaison,
and Community Service Officers. The Chaplains, Partners, and Crime Prevention are also a part
of the Operations Division. The Support Services Division is comprised of the Office of Profes
sional Standards, Investigations, Dispatch/Jail, Animal Services, and Records. The General Inves
tigations Unit is responsible for the majority of follow-up investigations which include homicide,
assaults, robbery, and child abuse. The Special Investigations Unit focuses on drug, gang, and
vice offenses.
The Lodi Police Department defines offenses for statistical purposes using the Uniform Crime
Reporting Code of California which classifies crimes as Part 1 or Part 2 based on their severity.
Part 1 Crimes include homicide, rape, robbery, aggravated assault, burglary, larceny, auto theft,
and arson, Part 2 Crimes affect property. In 2021, 1,923 Part 1 crimes were reported, and the
following crime rates per 1,000 residents: violent 3.28; property 24.59; overall 27.87. It should
be noted that overall crime rates per 1,000 residents have decreased 35 percent since 2011
which had the following crime rates: violent 3.7; property 39.2; overall 42.9.4 The Lodi Police
Department's ratio of officers to 1,000 population is 1.2. The table below compares crime rates
per 1,000 residents by city.
Table 3-4: Regional Crime Rates
Crime Rates per 1,000 residents (2021)
City Violent Property
Lodi 3.28 24.59
Tracy 2.1 17.4
Manteca 2.6 21.01
Stockton 12.62 30.82
' Lodi Police Department 2021 Annual Report
3-7
Figure 3-2: Lodi Police Department and Service Districts
_ __,?:
\VoodDr e
,-
-
•
SUNSET DISTRICT ERITAIE DISTIICT
BEAT 1 IEAT2
CENTRAL DISTRICT
BEAT 5
•
HER1TA8/alfTJIC
,.___....,.
8
t
N
The department is the City's largest General Fund department with 111 positions and a FY
2021-22 operating budget of $27,157,950. A summary of expenditures and staffing are shown
in Table 3-5
3-8
Table 3-5: Lodi Police Budget and Staffing
:�:.:�=�••�• --•-�- ., � :•
7�
• • � • • •. -�• ;._�,�� �f.:�, l � •_ • .-P• ,
:; < : :r��• ./' - : • - • ;
. . · · · 2020/21 2021/22 City
2018/19 2019/20 2020/21 Estimated Council
Police Department Expenditure Summary Actuals Actuals Budget Actuals Adopted
.
71 -Salaries & Benefrts 17,376,484 19,994,567 21,791,530 21,277,750 22,968,530
72 -Supplies & Services 2,346,125 2,979,292 2,594,700 2,697,090 2,768,730
74 -Insurances 237,260 501,630 512,300 512,300 612,690
n-Operating Transfer o 100,000 336,000 210,000 210,000 808,000
78 -capital Projects 23,085 115,089 56,921 56,930 0
Police Department Total 20,082,954 23,926,578 25,165,451 24,754,070 27,157,950
201S-ll 2019-20 ,.,.._2020-21 ............20Z1.ZZ
,......JIRl.21
5rAFRNG SUWMIIY PDIIIIOIII l'ollllOIII
POLICE DEPARTMENT
Admlnbtratlw Assistant 1.0 1.0 1.0 1.0 1.0
Animal Servk:es Supervisor 1.0 1.0 1.0 1.0 1.0
Assistant Animal Services Offteer 2.0 2.0 2.0 2.0
2.0
Code Enforcement Officer 2.0 2.0 2.0
Olspotcher Supervisor 1.0 1.0 1.0 1.0 3.0
Obpatchor/Jaller 13.0 13.0 13.0 13.0 1.0
lead Dispatcher/Jailer 4.0 4.0 4.0 4.0 13.0
Man11ement Analyst 1.0 1.0 1.0 1.0 4.0
PoliceC aptain 2.0 2.0 2.0 2.0
1.0
PoliceCMel 1.0 1.0 1.0 1.0
Police Corp«al 7.0 7.0 7.0 7.0 2.0
Police Ueutenant 5.0 5.0 5.0 5.0 1.0
Police Officer 53.0 53.0 53.0 53.0 7.0
Police Records Cieri< 3.0 3.0 3.0 4.0 5.0
Police Records Cieri< Supervisor 1.0 1.0 1.0 1.0
53.0
Police Ser,.ant 9.0 9.0 9.0 9.0
Property/Evidence TechnK:ian 1.0 1.0 1.0 1.0 4.0
Senior Administrative Clerk 1.0 1.0 1.0 1.0 1.0
Senlcr Police Admlnbtretlve Clerk 1.0 1.0 1.0 1.0 9.0
Police Department T ot.l 109.1) 109.0 109.0 108.0
1.0
Ttw:,��moo:���s below are requir�� to prevent}rime and \4ensure th�:idequate pro-
vifRll4't �TM!lfVices. 10,.0 10,.0 10,.0 uu
• GM-G4: Provide public facilities including police and fire services, schools, and libraries
commensurate with the needs of the existing and future population.
• GM-P27: Maintain sufficient fire and police personnel and facilities to ensure maintenance
of acceptable levels of service. Provide needed facilities concurrent with phased develop
ment.
• S-P7: Site critical emergency response facilities such as hospitals, fire stations, police offices,
substations, emergency operations centers and other emergency service facilities and utili
ties to minimize exposure to flooding and other hazards.
3-9
Funding for these capital improvements is to be provided through development impact mitiga
tion fees on all new residential, commercial, office and industrial developments.
The City of Lodi funds its law enforcement exclusively through the General Fund, a portion of
these funds being generated by Measure L sales tax revenues. Forty percent of Lodi's General
Funds are allocated to the Lodi Police Department for the 2022 budget cycle, providing a yearly
budget of $27,157,950.
As outlined in the Lodi General Plan Health and Safety Elements, the goal for Lodi Police De
partment response time is an average of three minutes for emergency calls (Priority 1) and 30
minutes for non-emergency calls (Priority 2). This year (2022), the actual average response
times are 4.42 minutes for emergency calls, and 26.39 minutes for non-emergency calls. Table
3-6 compares Priority 1 and Priority 2 response times by city.
Table 3-6: Lodi Police Response Times
Police Department Response Times
City Priority 1 (minutes) Priority 2 (minutes)
Lodi 4.42 26.39
Tracy 9:58 27:46
Manteca 4:48 27:00
Stockton 19.3 26.0
2. Provisions for Future Growth and Systems Improvement
The development of recent annexations will result in additional demand for police service. The
additional operations costs that result will be provided by the expanded tax base that results
from new development, as well as the continuation of the residential Community Facilities Dis
tricts. Capital costs for facilities and equipment will be funded by development impact mitiga
tion fees.
All areas outside of the City boundaries are currently under the jurisdiction of the San Joaquin
County Sheriff's Department. Once annexed, the City of Lodi Police Department will expand
police services in order to provide service to the project areas. As mentioned above, funding
will be provided by the expanded tax base, Community Facilities Districts, and development
impact mitigation fees.
C. Public Services (Libraries}
3-10
1. Libraries
The City of Lodi library, located at 201 West Locust Street, provides family programs, adult lit
eracy programs, free public internet access, informational material, and other community ser
vices. Figure 3-3 shows the library's location relative to other public services.
As of 2022, the library had holdings of approximately 89,000 books, 25 magazine subscriptions,
8 newspapers, as well as audio books, videos, music CDs, and CD-ROM media. The Lodi Public
Library serves 27,149 registered borrowers, who check out approximately 200,000 items a year.
The library offers a number of services and programs to assist its users, including computer ser
vices, performances, workshops and classes, and special programs for youth.
Given Lodi's compact form, a central main library branch is appropriate, though additional
neighborhood branches may be desirable. Locations for new library branches would include
mixed-use centers and the Eastside, which currently has poor access to the existing library. Ad
ditionally, while most of the Public/Quasi-Public designation in the General Plan is attributed to
new schools, an estimated 10-acres are assumed to be used for other public uses, such as li
brary branches. Sites identified in the 2002 Lodi Public Library Facilities Management Plan
should also be considered. The following 2010 General Plan policies are applicable to library
facilities.
• GM-G4: Provide public facilities including police and fire services, schools, and libraries
commensurate with the needs of the existing and future population.
• GM-P25: Locate any additional library branches to ensure all neighborhoods are served, in
particular in the Eastside neighborhood and in proposed mixed-use centers.
The library is open 64 hours a week and is staffed by eight full time employees and a FY 2021-22
operating budget of $1,666,850. A summary of expenditures and staffing are shown in Table 3-
7.
3-11
Table 3-7: Lodi Library Budget and Staffing
-�::,:-\it\.}�5�..
1
;if!t�: --�:�:-�Jr:�.:rr:::•Jtfz�:: ��::-t��J\: x��-:·; �_,_:_ ;:�;
��;·:i. ,
":·-<· ·': ' :, · • .. , '. · ·: . ' " . . · · . 2020/21 2021/22 City
·. . • ' ·, : ,• ."2018/19 ·2019/20 · 2020/21 · Estimated Council
Library Expenditure Summary Actuals Actuals Budget Actuals Adopted
71 • Salaries & Benefits 802,254 841,054 924,390 787,960 927,820
72 -Supplies & Services 336,886 307,130 473,000 426,600 475,700
74 -Insurances 16,125 33,000 32,900 32,900 39,350
77 -Operating Transfers 185,620 159,050 254,000 254,000 162,980
78 -capital Projects 10,233 0 80,000 86,000 61,000
Library Total 1,351,119 1,340,234 1,764,290 1,587,460 1,666,850
2018-19 2019-20 2020-21 2021-22
STAFFING SUMMARY Positions Positions Positions Positions
LIBRARY
Librarian 0.0 1.0 1.0 1.0
Library Assistant 2.0 2.0 2.0 2.0
Library Services Director 1.0 1.0 1.0 1.0
Library Technician 1.0 1.0 1.0 1.0
Literacy/Volunteer Manager 1.0 1.0 0.0 0.0
Literacy/Program Manager 0.0 0.0 1.0 1.0
Senior library Assistant 2.0 2.0 2.0 2.0
library Total 7.0 8.0 8.0 8.0
3-12
Figure 3-3: Public Services
e ....'°' "'""
�
: I C,,Jltufh 14YO
j
I MM(f1rJNC f..O
@
•a High School Fire Station
@
Middle School Police Station
@ Elementary School {ll Library
� Other School •········ Sphere ot Influence (2008)
� Planned School •-·-City Limits (2008)
� Private School
3•24 I LODI GENERAL PLAN
3-13
D. Water Supply, Conservation and Treatment
This section summarizes findings from City documents regarding the City's ability to provide
adequate water service to the City including recent annexations. These documents include the
2020 Urban Water Management Plan (UWMP), 2012 Wastewater Master Plan, 2010 General
Plan, 2012 Water Master Plan, and the 2020 Water Quality Report.
The City of Lodi Water Utility is the sole water purveyor for the City. The City's water service
area is contiguous with City boundaries and covers approximately 13.6 square miles. There are
a few minor connections outside the City. The service area includes a mix of residential, com
mercial, and industrial land use, and is characterized by an essentially flat terrain.
The City provides a small volume of water to Sunnyside Estates and Henderson School, which
are located outside of the City boundary but within the General Plan boundary, in the vicinity of
Harney Lane and Lower Sacramento Road. The City has been providing a small volume of water
to Sunnyside Estates for potable use since 2002 through an agreement between the City and
San Joaquin County Department of Public Works. Over the past year, approximately 19 AF of
water (6.2 million gallons) was supplied to Sunnyside Estates. Even though the City sells water
to Sunnyside Estates outside of the City service area, the volume of water is small and well be
low the reporting threshold of 3,000 AFY for the City to be considered a wholesale supplier.
The City's Surface Water Treatment Facility (SWTF) began operation in November 2012 and is
located near Lodi Lake on four acres of City-owned property. The City currently serves 26,230
metered, unmetered, and inactive municipal connections and delivers approximately 13,978 AF
to its customers (Table 3-8). The City is a public water system (PWS) in accordance with the
ewe and the California Health and Safety Code. The service area of the City (i.e., city bounda
ries) is served by one PWS, as depicted on Figure 3-4.
Table 3-8: Public Water Systems
Tahl<• :? l: Puhlir \\".itu Sy,tr1m (D\\'R ·r .1hk 2-l)
Volume of
Public Water System Public Water System Number of Municipal
Water Supplied
Number Name COJU1ectioos 2020
2020
3910004 26,230 13.978
City of Lodi
26,230 13,978
TOTAL
Source: 2020 UWMP
3-14
Figure 3-4: City Water Service Area
A
w
Surfoc• Wotor
Tniotment Fiiclllty
.,..
12
12
City Water Service Area
0.25 O.& 8°"....::...-•.-•-.,.Cllr�
�!!!§iiiiiiiiiiiiiiil!!!!!!!!!!!!!!!!!!!!!!I .....
J-----tH
1. Existing Supply and Demand
Supply
This section discusses the City of Lodi's two primary water sources: groundwater from the East
ern San Joaquin Basin and surface water purchased water from the Woodbridge Irrigation Dis
trict (WID).
Groundwater
The City relies on local groundwater from the Eastern San Joaquin Subbasin and surface water
supplies from the Mokelumne River purchased from Woodbridge Irrigation District (WID). The
City's primary source of water is groundwater that it pumps using 28 groundwater production
wells distributed throughout the water service area.
3-15
Surface Water
From the completion of the SWTF in November 2012 through FY 2016, an average of 26 percent
of the monthly water supply came from surface water instead of groundwater and an average
of 300 acre-feet (AF) less water was pumped from the wells each month. (One acre-foot of wa
ter is the amount of water that covers an area one acre in size to a depth of one foot and pro
vides sufficient supplies for three to four families annually.) Since FY 2016, surface water has
provided around 50 percent of the total water supply with an associated reduction in ground
water use.
Irrigation District Water
In May 2003, the City entered into an agreement with WID to purchase 6,000 acre-feet per year
(AFY) of surface water from the Mokelumne River (with delivery via WID canal facilities near
Woodbridge Dam) for a period of 40 years. In the future, the City will continue to pump
groundwater and utilize treated surface water per its agreements with WID, as seen in Table 3-
9. The City also has access to a banked surface water supply under its agreement with WID. The
City had an agreement with North San Joaquin Water Conservation District (NSJWCD) from Oc
tober 2015 through October 2020 for up to 1,000 AFY of Mokelumne River water, but no water
was provided under this agreement in FY 2020.
Table 3-9: Total Water Supplies
Ta hit> Z: Tot.ii \Yater Supplil·, -.\rtual and Projerte<I (.\F)
Yea1·
Water Supp�' Soune
2020 2025 2030 2035 2040 2045
Pmchased Water from the
6,000 6,000 6,000
Mokehunne River 6,503 6,000 6,000
Grom1dwater 15,000
7,475 15,000 15.000 15,000 15,000
Total Water Supply 13,978 21,000 21,000 21,000 21,000 21,000
Demand
This section discusses the City of Lodi's potable and raw water demand, and recycled water
demand.
Water production is the volume of water measured at the source (i.e., SWTF outflows and City
groundwater wells}, and includes all water delivered to residential, government, commercial,
and industrial connections, as well as unaccounted-for water (e.g., water lost from leaking
3-16
pipes). All of the City's water came from groundwater wells before November 2012 (FY 2013)
when the SWTF came online; the SWTF presently provides, on average, approximately SO per
cent of the annual water production.
In 2020, 33 percent of the accounts that the City delivers water to remain unmetered and con
sist primarily of residential, government, and commercial customers. There is recycled water
used in the vicinity of the wastewater treatment plant (WWTP); however, this water is not in
cluded as a water demand since it is not replacing water that would have otherwise been pro
vided by the City. The recycled water is used to irrigate crops for cattle, power plant cooling,
and pond replenishment.
Future water demand estimates are based on the assumptions that the City's population and
housing units will increase at a consistent 1.16 percent annually and water demand per capita
will stay relatively stable. By 2045, average annual water demands are expected to have in
creased from current demands by approximately 24 percent, from about 14,000 AFY in 2020 to
about 18,300 AFY in 2045 (shown in Table 3-10).
Table 3-10: Total Water Demand
Tal>lr .,: Total Watrr Drmaruh -.-\rtual aud l'rojrrtrd (.\I')
Yen
"'ater Demand
Sertor
2020 2025 2030 2035 2040 2045
Potable and Raw
13.979
14.663 15.512 16,410 17,360 18.365
Water
Recycled Water
4,746 4.746 4.746 4.746 4.746 4.746
Demand
2. Existing Water Distribution System
The City currently utilizes groundwater as its primary source of supply. The City's existing water
distribution system is a 245-mile grid network of 6, 8, 10, 12 and 14-inch diameter mains, four
water storage tanks with a combined storage capacity of 5.1 million gallons and a total of 28
groundwater wells spaced at half-mile intervals throughout the City. The City built a new stor
age tank at Well 23 (Maggio Circle) that has been in operation since 2020. In addition, a storage
tank at Well 28 (Kettleman Lane and Westgate Drive) is scheduled to be completed by 2025.
The capacity of the wells range from 1.2 to 3.0 mgd and the total capacity of the 28 existing
wells is 54.8 mgd. All wells are equipped with chlorination equipment which provides system-
3-17
wide disinfection. The 28 wells have a combined capacity of 37,910 gpm or 19.9 billion gallons
per year.
(Sources: 2012 Water Master Plan; 2020 UWMP)
3. Water Quality
An assessment of the drinking water sources for the City of Lodi's distribution system was com
pleted in February 2003 and water treatment plant in August 2011. The sources are considered
most vulnerable to the following activities:
♦ Gas stations (historic and current)
♦ Chemical/petroleum processing and storage
♦Metal plating/finishing/fabricating
♦ Plastic/synthetic producers
♦ Dry cleaners
♦ Known contaminant plumes
♦ Sewer collection systems
♦ Fleet/truck/bus terminals
♦ Machine shops
♦ Utility stations and maintenance areas
♦ Agricultural drainage
♦ Photo processing/printing
The City has incorporated management measures to help maintain high groundwater quality,
including cleanup work that is ongoing for PCE (Tetrachloroethylene) and TCE (Trichloroeth
ylene), as these chemicals have been detected in wells in north and central Lodi area. The City's
consultants have developed a computer model of the groundwater, which will enable the City
to optimize the number, size and location of wells to accomplish the cleanup in an efficient
manner.
4. Demand Management and Conservation Measures
In compliance with the Urban Water Management Act, the City's 2020 UWMP identifies a series
of Demand Management Measures (DMM), also known as Best Management Practices (BMPs).
These measures are designed to maximize the efficient use of water and minimize water waste.
Water Waste Prevention Ordinances
The City's ongoing Water Conservation Ordinance (Lodi Municipal Code, Chapter 13.08, Article
Ill), first implemented in 1977 with the most recent update going into effect on December 18,
2015, defines water waste prohibitions for the City's customers. The Ordinance provides sever-
3-18
al definitions of the "waste of water," outlines watering days and hours, describes the City's
enforcement procedures, and discusses the violations and infractions process.
The Water Conservation Ordinance has been actively enforced for ten years resulting in adjust
ed customer water use. In the future, the Water Conservation Ordinance will continue to set a
baseline level for conservation in the City due to enforceable restrictions on water wasting ac
tivities.
Metering
The City's primary means for achieving and sustaining the urban use targets is through its Wa
ter Meter Program. The City currently meters and bills for actual water used for its metered
customers and is currently implementing a program to install water meters on all unmetered
commercial and residential customers and is estimated to be completed by 2025.
The City has completed all phases of the residential metering program with conversion to usage
volumetric-based water rates occurring at least several months after the meter is installed. It is
estimated that all customers will be transitioned to usage-based water rates by January 2025.
Various studies have estimated water savings as a result of metering and commodity pricing.
Past studies have indicated that metering results in a 10 to 40 percent reduction in water use,
with 15 percent as most typical.
Conservation Pricing
As previously mentioned, the City is currently implementing its Water Meter Program. Water
meters for all customers will be installed through 2025 with implementation of usage-based
billing for all customers occurring by the beginning of 2025. The City is also working on meter
installation for currently unmetered commercial customers which should also be completed by
2025. The City continues to use a water rate structure that includes a fixed service change and a
three-tier usage rate structure which is intended to help encourage water conservation.
Programs to Assess and Manage Distribution System Loss
In 2001, the City implemented a capital improvement program to replace water lines, averaging
one percent replacement annually. The Water Meter Program that began in 2011 included wa
ter main evaluation and replacement of mains (including relocation) that did not comply with
the City's six-inch minimum diameter criteria. The City has since completed the residential me
tering program.
Other Demand Management Measures
3-19
The effectiveness of this program is based upon the number of rebates issued for water conser
vation devices (currently tracked by the City) and the percentage of customers that install the
equipment after purchasing the devices. As the City becomes fully metered, the effectiveness
of this DMM may be evaluated by comparing metered water use for customers before and af
ter installation of water saving devices.
5. Future Demand, Supply, and Water Projects
Demand
Water demand projections provide the basis for sizing and staging future water supply facilities.
Water use and production records, combined with projections of population and urban devel
opment, provide the basis for estimating future water requirements. In addition, projected wa
ter use and supplies are also projected under the assumption that years 2021 through 2025 are
drought conditions.
Future water demands were projected based on actual water use from 2015 through 2020, as
measured by production rates at the City's groundwater well sites and the SWTF as well as av
erage metered water use by customer class. Future water demand estimates are based on as
sumptions that the City's population and housing units will increase at a consistent 1.16 percent
annual increase and water demand per capita will stay relatively stable. By 2045, average annu
al water demands are projected to increase from current demands by approximately 24 per
cent, from about 14,000 AFY in 2020 to about 18,300 AFY in 2045. Demand projections by wa
ter use sector are presented in Table 3-11.
3-20
Table 3-11: Potable and Non-Potable Water Use
C,e T�pe PtoJe(h:d \\-tle1 l_',t•
Additional
Description
202, 2030 2035 2040 204'
Metered and
Single Family unmctcrcd 7,780 8.231 8,707 9,211 9.745
accounts
Metered and
Multi-Family unmetered 2.170 2.296 2.429 2,570 2.718
accounts
Metered and
Commercial unmetered 3,108 3.288 3,478 3.679 3,892
accounts
Metered and
lnstin1tional/Governmental unmetered 878 929 983 1.040 1,100
accounts
Metered and
Industrial unmetercd 270 285 302 319 338
accounts
Calculated
Losses usingAWWA 456 482 510 540 571
software
TOTAL 14.663 15.512 16.410 17.360 18.365
Source: 2020 UWMP
Supply
The City currently uses groundwater as its primary source of supply, pumping 7,475 AF from its
28 wells in 2020, as shown in Table 3-12. The City currently has the capacity to store approxi
mately 12.6 AF of water (5.1 million gallons) in four different storage tanks - one at the SWTF
and three in key areas of the City's distribution system.
Limited recycled water is used in the vicinity of the WWTP, primarily for the City-owned agricul
tural fields, and at power-generating facilities owned by NCPA. Approximately 4,746 AF of recy
cled water was beneficially applied to or used on the City-owned lands surrounding the WWTP
in 2020. This recycled water supply does not help meet potable demand and all projections
would be used within the vicinity of the WWTP.
3-21
Table 3-12: Water Supplies
.!fllO
Additional Detail on Water
\\",11<:1 '-upply Total Right or
Supply Actual Volwne Water Quality
Safe Yield (AF)
Purchased or
WID from Mokebwme River 6.503 Drinking Water 6.000
Imported Water
Purchased or NSJWCD from Mokelwune
0 Drinking Water 1,000
hnported Water River
GrolUldwater (not
desalinated) From 28 municipal wells 7.475 Drinking Water 15,000
Recycled Water 4,746 Recycled Water
Total 18.724 22,000 I
Table 3-13 summarizes the projected future water supplies through 2045, including purchased
water from WID, groundwater, and recycled water. In the future, the City will continue to pump
groundwater and utilize treated surface water per its agreements with WID. From WID, the
agreement allotment of 6,000 AF is assumed, though the supply volume may increase when the
City decides to use its banked supply. The SWTF currently has a treatment capacity of 10 MGD
(approximately 11,200 AFY) and is expandable to up to 20 MGD (approximately 22,400 AFY), so
the City has the opportunity to expand its surface water use in the future. The potential for an
increase in storage capacity in the City's distribution system, and two additional storage tanks,
increases the City's reliability for providing water to its customers.
With a safe yield of 15,000 AFY estimated for the portion of the groundwater subbasin underly
ing the City, the City is able to reasonably project having access to that same amount of
groundwater in the future. Table 3-13, though, the total amount of recycled water reasonably
available is the total amount of wastewater influent from the municipal sewer line. Municipal
wastewater is estimated to increase as the City's population increases.
3-22
Table 3-13: Projected Water Supply
202!! 2030 2035 2040 2145
Addiliolll1
Detail OD WIier
Supply � A,-ailablc or Rip! T Sde oca! � A,'llilable or Ri Toc S p a de ! t a-oa.b A,'lilable ly or Ripl T S oca de ! Raloab A\'lilable ly or Rip T olal Sale l l A ■n '1lillble •bly or Rip! T ola Sale l
Volame Yield Volume Yield Volamc Yield Volume Yield v.- YieW
Purchased or WID from
Imported Mokelwunc 6.000 6.000 6.000 6.000 6.000 6.000 6.000 6.000 6.000 6.000
Water River
Froru28
Growidwater ruWJicipal wells
(not in the Eastern 15.000 15.000 15.000 15.000 15,000 15,000 15.000 15.000 15.000 15.000
desalinated) San Joaquin
Subbasin
Recycled
5.844 5.912 5.980 6.049 6.119
Water
Total 26.844 21.000 26.912 21.000 26.980 21.000 27.049 21.000 27.119 21.000
Source: 2020 UWMP
Water Projects
The City, which solely relied on groundwater historically, has increased its use of surface water
such that it accounts for almost half of the City's supplies. The City plans to expand SWTF capac
ity from 10 MGD (or 36.1 AFD) to 20 MGD (or 61.4 AFD) around 2030 or demand when needed
to meet demands. This project would include new water supply agreements to increase the
City's surface water supplies beyond 6,000 AFY. The SWTF expansion project is included in Ta
ble 3-14.
Since the completion of the 2015 UWMP, the City has built a new storage tank at Well 23 and is
in the process of building an additional storage tank at Well 28 which should be completed in
2025. These storage tanks push back or potentially eliminate the need to construct new wells,
which were determined to be needed by 2035 to meet demands in the City's Water Master
Plan.
3-23
Table 3-14: Water Supply Projects
D
18}
Page 6-23
Name of Joint Pmmed
Plamled
Future Project forUse
Description Implemc:otation inWl1a'
Projects or with other in Year
Year Supply to
Programs suppliers'? Type
lier
Expand SWTF capacity from
IO MGD (or 36.l AFD) to 20 5,200to
SWTF All Year
No MGD (or 61.4 AFD) 2030 6,000
Expansion Types
somewhere around 2030 or as AFY
demand approaches supply
Source: 2020 UWMP
E. Wastewater Collection and Treatment
The City of Lodi Department of Public Works provides wastewater collection and treatment for
the incorporated area of the City of Lodi. The City's Wastewater Master Plan was prepared in
2012 and is the primary source for the information included in this section. This Master Plan
outlines a long-term strategy for meeting future discharge and capacity requirements in order
to meet community needs for a planning horizon that extends to 2020. Population projections
used for wastewater facility planning were based on a 1.5 percent growth rate, which is the
City's assumed annual growth rate.5
1. Wastewater Collection Facilities
The City's wastewater system currently consists of about 191 miles of collection system pipe
lines ranging in sizes from 4 to 42 inches in diameter, with 6 inches being the predominant size.
The pipelines discharge into a 48-inch sewer outfall line that was rehabilitated in 2008 reducing
the pipe diameter from 48 inches to 42 inches, which flows southwest to the City's White
Slough Water Pollution Control Facility (WSWPCF) located approximately six miles west of
town.
5 West Yost and Associates, 2001, Ciry efu di lf/astewater Master Plan, June 2012.
3-24
There are six wastewater trunk lines (Hutchins Street, Mills Avenue, Ham Lane, Lower
Sacramento Road, Stockton Street/Washington Street, Beckman Road) serving the city that
generally flow from the north to the south. The six wastewater trunk lines connect to the Cen
tury Boulevard Trunk Line that flows east to west, and into the 42-inch trunk sewer to the
WSWPCF.
There are five lift stations located in the northern area of the city, Evergreen Pump Station,
Woodlake Pump Station, Rivergate Pump Station, Mokelumne Pump Station and Cluff Pump
Station, and three lift stations located in the southern area of the City, Tienda Pump Station,
Harney Lane Pump Station and Reynolds Ranch Pump Station.
2. Wastewater Treatment Plant Permitting and Capacity
The wastewater treatment facility has a current average dry weather flow capacity of 8.5 mil
lion gallons per day (mgd). Current dry weather flow is 4.4 mgd. The wastewater treatment fa
cility was originally constructed in 1966 with a capacity of 5.8 mgd. In the late 1980's and early
1990's the City expanded the treatment capacity to 6.3 mgd, and also improved the level of
treatment. Between 2003 and 2009 the City again expanded the dry weather treatment capaci
ty to the current 8.5 mgd and added denitrification, tertiary treatment and ultraviolet light dis
infection improvements.
3. Wastewater and Recycled Water
The City manages about 7,800 acre-feet per year of influent flows to the WSWPCF, and about
3,500 acre-feet per year is treated to secondary level and used for agricultural irrigation near
the WSWPCF for growing animal feed and fodder crops that are not for human consumption.
The City uses this industrial and/or domestic recycled water to irrigate about 790 acres of agri
cultural land owned by the City.
3. Future Wastewater Demand and System Improvements
In accordance with the General Plan's Land Use and Growth Management Element, the City
shall develop new facilities for water, wastewater and drainage as needed for development,
and shall fund necessary systemwide improvements in compliance with these policies:
• GM-G2 Provide infrastructure including water, sewer, stormwater, and solid
waste/recycling systems that is designed and timed to be consistent with projected capacity
requirements and development phasing.
• GM-PS Update impact fee system to balance the need to sufficiently fund needed facilities
and services without penalizing multifamily housing or infill development.
3-25
• GM-PS Ensure that public facilities and infrastructure including water supply, sewer, and
stormwater facilities are designed to meet projected capacity requirements to avoid the
need for future replacement and upsizing, pursuant to the General Plan and relevant mas
ter planning.
• GM-P9 Coordinate extension of sewer service, water service, and stormwater facilities into
new growth areas concurrent with development phasing. Decline requests for extension of
water and sewer lines beyond the city limit prior to the relevant development phase and
approve development plans and water system extension only when a dependable and ade
quate water supply for the development is assured.
The WWTP has adequate capacity to treat all wastewater flows to Title 22 standards for recy
cled water (California Code of Regulations, Division 4, Chapter 3, Section 60301). The industrial
wastewater, the majority of which comes from a fruit canning facility, is blended with treated
flows and is stored for agricultural irrigation of neighboring City-owned land. Table 3-15 shows
the volume of municipal (residential and commercial) plus industrial wastewater collected
in the service area during 2020.
Table 3-15: Collected Wastewater
Volmneof Name of
Wastewater
Wastewatre Wastewater lsWWTP lsWWTP
Name of Volmne
Collec:ted Trntment Located Operalioo
Wastewater Metered or Treatment
Collection Estimated? from A,eocy Plant Name Within Contracted
UWMP Recei\ing UWMP toa Third
Agency Drop.Down
Smice Collected Arca?
List
Area 2020 Wastewater
White
Slough
Water
City of Lodi Metered 5,787 City of Lodi Yes No
Pollution
Control
Facili
Total Wastewater
Colleded from Senice 5,787
Area In 2020:
3-26
Improvements to the WSWPCF are currently underway. Improvements include proposed lift
stations, and two new trunk lines are expected to be added to the existing wastewater system.
Current improvement plans are guided by the Phase 3 Improvements Project 2007 which calls
for installation of new influent screens (two), screening washers, influent pumps (two), and
new diffusers in Aeration Basins 1 and 2 and the construction of two new aeration basins and a
secondary clarifier. Flow modifications are also planned for aeration basins. These improve
ments will increase the treatment capacity of WSWPCF to treat up to 8.5 mgd of average dry
weather flows. The City's most recent permit, issued in September 2007, allows for an effluent
6
limit of 8.5 mgd upon completion of the WSWPCF Phase 3 Improvements.
Table 3-16: Projected Wastewater Flow
2001 2021
(mgd) (mgd)
Average 7.5 4.4
Peak Month 8.5 7.4
Peak Day 9.7 7.1
Peak Hour 14.4 15.3
Peak Day, dry weather 8.9 15.5
Peak Hour, dry weather 12.7 7.4
Source: C West Yost and Associates, January 15, 2001, City of Lodi Wastewater Master Plan.
F. Stormwater Drainage
Lodi's stormwater drainage system is managed by the City's Public Works Department. The
gravity-based stormwater system consists of trunk lines, retention basins, pump stations, and
surface infrastructure such as gutters, alleys, and storm ditches. Most of the basins are used as
parks and recreational facilities during non-runoff periods. Stormwater is disposed by pumping
into the Woodbridge Irrigation District (WID) Canal, Lodi Lake, and the Mokelumne River.
6 Swimley, Charles, Water Services Manager, City of Lodi. Written communication with Isby Swick, DC&E, October 11, 2007.
3-27
1. Existing Stormwater Drainage System
The City's storm drain infrastructure includes catch basins, manholes, 18 storm outlets, 227.9
acres of detention basins, 14 electrically powered pumping stations, and 110 miles of storm
water collection and conveyance piping. As of 2002-2003, the City had 2,750 catch basins and
1,600 manholes. On average, these numbers increase by 33 and 28 each year, respectively.
A significant portion of the City's stormwater runoff is released into the WID Canal. In accord
ance with the Storm Drainage Discharge Agreement between the City and WID, the City can
discharge a maximum of 160 cubic feet per second (cfs) in the winter and 40 cfs in the summer
into the WID canal. Maximum discharge rate per site is 60 cfs in the winter and 20 cfs in the
summer. However, maximum discharge rates can be increased with twelve-hour notice if ap
proved by WID. The City's most recent agreement was approved by City Council on Oct 20,
1993 and extends for 40 years. This agreement includes the City's right to modify existing
Beckman and Shady Acres pump stations and to construct additional discharge points.
Excess stormwater is temporarily stored in retention basins, from where it is gradually released
into the Mokelumne River, WID Canal and Lodi Lake to reduce potential flooding impacts.
Many of the City's detention basins function as sports facilities during dry conditions. Table 3-
17 further describes the storm drain system basin data.
Table 3-17: Storm Drain Data
Tributary Area Site Land Area Detention Capacity
Basin/Park
(acns) (acres) (IC.ft.)
A·l, Kofu 491 121 41.5
A-2, Beckman 564 16.22 60.0
B-1, Vinewood 964 16.0 41.5
B-2, Glaves3 450 13.2 31.1
C,Pixley4 1,091 27.3 128.7
D, Salas 21.0 94.0
790
E, Peterson 340 20.9 61.0
F (at Kettleman) 30.0 68.5
369
F (near Tokay) 30.0 68.5
G (DeBene.detti) 866 46.3 202.0
H (Discharge to River) 428
1 (Undeveloped) 320 25.0
Total 6,673 227.9 728.3
Italics indicate future or partially complete facilities. 1: Kofu acreage includes park south to tennis courts, excludes
Municipal Service Center (MSC) & MSC parking. 2: Beckman acreage excludes Fire Station. 3: Glaves Park formerly
Twin Oaks Park. 4: Pixley volume does not include 7 ac. ft. in Beckman Rd. ditch
3-28
Stormwater quality concerns include suspended solids and high nitrate levels (most likely from
lawn fertilizers). Algal blooms below City outlets following pumping evidence this problem.
The City's stormwater pumps, and detention basins are adequate for existing runoff volume.
However, localized flooding has occurred at the 1700 block of Lockeford Street and residential
streets southwest of Peterson Park. Improvements have been made to improve flooding prob
lems at Lockeford Street; minor flooding in the area southwest of Peterson Park due to under
sized pipes has not yet been addressed. Systemwide modeling has not been completed to con
firm and predict operation of the system as it expands.
2. Future Stormwater Drainage Demands and System Improvements
The stormwater plan for the reasonable development of the General Plan includes the division
of the City's growth areas into 16 drainage watersheds. For each of these watershed areas, the
tributary trunk drain, detention basin, discharge rate (gravity flow or pump station), and outfall
pipeline have been preliminarily sized. These facilities are briefly described in General Plan Ta
ble 3-6, though facility planning, and sizing will need to be refined and verified though prepara
tion of a detailed stormwater master plan.
Proposed development of recent and approved project areas will necessitate expansion and
improvements to the existing Stormwater system. These improvements include:
♦ Lumina Subdivision is required to deepen the existing basin and construct an outlet struc
ture.
♦ Gateway South subdivision is required to build a new detention basin.
♦ Rose Gate II subdivision is required to build a new detention basin and pump station.
G. Electrical Utility
Electrical service to the city is provided by the Lodi Electric Utility. The Lodi Electric Utility is a
customer-owned and City-operated utility that provides electrical services for residential,
commercial, and industrial customers in the city.
Since 1968, the Lodi Electric Utility has been a member of the Northern California Power Agen
cy (NCPA), which is a California Joint Powers Authority comprised of seventeen public utilities.
Through NCPA, Lodi Electric Utility is able to obtain electricity at cost, facilitating low energy
prices for customers.
In 2007, 53% of the city's power came from renewable energy sources, primarily geothermal
and small and large hydroelectric; natural gas {29%) and coal {18%) composed the remaining
3-29
power sources. Natural gas service for the Planning Area is provided by Pacific Gas and Electric
Company (PG&E) and is piped from gas fields in Tracy and Rio Vista.
In calendar year 2021, Lodi used 446 gigawatt-hours (GWH) of electricity. On average, between
6,700 and 7,060 kW-hours of electricity are consumed per household per year. 7
1. Energy Conservation
The City currently administers and implements a variety of local energy conservation and waste
reduction programs, including:
• Low-voltage LED lighting equipment in traffic signals.
• Solar assisted equipment at all new bus shelters/stops.
• Curbside recycling (which has allowed the city to meet the California Integrated Waste
Management Act of 1989 requirement to divert at least 50% of waste from landfills).
• Energy education programs for children and students.
• Standards for photovoltaic panel installation.
• Lighting, heating, solar, and air conditioning rebate programs for residential and non
residential customers through the City's Electric Utility.
The General Plan seeks to reduce energy consumption through conservation efforts and re
newable energy sources, as well as through land use, transportation, water, and green building
and construction strategies.
Title 24 of the California Electrical Code provides energy conservation standards for residential
and commercial construction. The City enforces these standards through the local building
permit process.
2. Future Demand and Infrastructure Improvements
The Utility projects that electrical demand will grow 11.2% from year 2020 (132.5 MWh) to year
2030 (147.3 MWh). As areas are annexed into the City, the electrical service provider will shift
from PG&E to the Lodi Electric Utility. Infrastructure needs related to annexations are discussed
below:
Provision of electrical service to the new residential sub-divisions in the South and West part of
the City will require expansion of existing primary distribution lines and establishment of ser-
7 H. Shariar, Lodi Electric Utility, 5/13/22.
3-30
vice connections and would be funded by the developer. Power provided to the project areas
would be derived from the Henning and Industrial Substations.
Provision of electrical service to industrial load growth in the East part of the City will require
building a new distribution line and expansion of existing lines and would be funded by the de
veloper. Power provided to the project areas would be derived from the Industrial Substation.
H. Determination
As the City of Lodi continues to grow, there will be a need to expand infrastructure services.
The following is a summary of the major City actions that may be required to ensure adequate
provision of infrastructure services for the five-year sphere horizon.
1. Fire Protection
Providing adequate service to the southern area of the City is currently a challenge faced by the
Lodi Fire Department. Average response time of 4.8 minutes exceeds the three-minute goal
largely due to high response times for the southern corners of the City. The new fire stations
planned for the SW Gateway and Reynold's Ranch project areas will improve response times
and level of service to the southern areas of the City and enable the department to provide ser
vice to the project areas.
Adequate fire service for the recently annexed areas and areas within the 10-year and 30-year
horizons will be met by the development of new fire stations and increased staffing. The ex
panded tax base that results from new development, the continuation of the residential Com
munity Facilities Districts, and development impact fees will provide funding for additional fire
stations, equipment and personnel.
2. Law Enforcement
The City will implement policies under the General Plan Health and Safety Element which re
quires the City to ensure the adequate provision of police services.
■ GM-G4 Provide public facilities-including police and fire services, schools, and libraries
commensurate with the needs of the existing and future population.
• GM-P27 Maintain sufficient fire and police personnel and facilities to ensure maintenance
of acceptable levels of service. Provide needed facilities concurrent with phased develop
ment.
3-31
3. Public Services
Library
Additional neighborhood branches may be desirable. Locations for new library branches would
include mixed-use centers and the Eastside, which currently has poor access to the existing li
brary. The following 2010 General Plan policies are applicable to library facilities.
• GM-G4 Provide public facilities including police and fire services, schools, and libraries
commensurate with the needs of the existing and future population.
• GM-P25 Locate any additional library branches to ensure all neighborhoods are served, in
particular in the Eastside neighborhood and in proposed mixed-use centers.
4. Water Supply, Conservation and Treatment
Future water demands were projected based on actual water use from 2015 through 2020, as
measured by production rates at the City's groundwater well sites and the SWTF as well as av
erage metered water use by customer class. Future water demand estimates are based on as
sumptions that the City's population and housing units will increase at a consistent 1.16 percent
annual increase and water demand per capita will stay relatively stable. By 2045, average annu
al water demands are projected to increase from current demands by approximately 24 per
cent, from about 14,000 AFY in 2020 to about 18,300 AFY in 2045.
In order to provide water service to the existing population, the City will need to continue using
existing supply sources including groundwater and recycled water. The estimated safe ground
water yield will increase as the City's surface area expands due to annexations within the SOI.
However, the City will not approve new developments until adequate water supply is assured.
5. Wastewater Collection and Treatment
Wastewater treatment for the City of Lodi is provided by the City operated White Slough
Wastewater Pollution Control Facility (WSWPCF). The facility's current design capacity is 8.5
million gallons per day (mgd) and has adequate capacity to treat all wastewater flows to Title
22 standards. The service area currently generates an estimated 4.4 mgd of dry weather flow,
and the plant is currently functioning at 75-percent of design capacity.
The City of Lodi Wastewater Management Plan projected that wastewater flow would reach 8.5
mgd in 2020, and the WSWPCF would be operating at 100-percent of design and RWQCB per-
3-32
mitted capacity. The significant infrastructure for wastewater collection and treatment needed
for the development of recently annexed areas will be designed to connect to existing systems
and will be funded by development fees. The City will utilize the Wastewater Master Plan up
date process to identify needed improvements to support additional growth within the SOI.
6. Stormwater Drainage
The stormwater plan for the reasonable development of the General Plan includes the division
of the City's growth areas into 16 drainage watersheds. For each of these watershed areas, the
tributary trunk drain, detention basin, discharge rate (gravity flow or pump station), and outfall
pipeline have been preliminarily sized. These facilities are briefly described in General Plan Ta
ble 3-6, though facility planning, and sizing will need to be refined and verified though prepara
tion of a detailed stormwater master plan.
7. Electric Utilities
Electrical services are provided to residential, commercial and industrial customers in the City
of Lodi by the Lodi Electric Utility. The Utility is a member of the Northern California Power
Agency (NPCA), a Joint Action Agency which enables the Utility to purchase and supply electrici
ty at cost.
According to the Utility, peak demand in megawatt hours (MWh) increased 6.25 percent from
124.7 MWh in 2010 to 132.5 MWh in 2020. The Utility is planning to meet future energy needs
by implementing conservation programs, as well as planning for new infrastructure. Increased
energy demand generated by the development of the recent annexations is consistent with
projected future energy demands, as both respond to regional growth forecasts and the City's
General Plan. New infrastructure development will connect to the existing system.
Provision of electrical service to the new residential sub-divisions in the South and West part of
the City will require expansion of existing primary distribution lines and establishment of ser
vice connections. Power provided to the project areas would be derived from the Henning and
Industrial Substations. Provision of electrical service to industrial load growth in the East part
of the City will require building a new distribution line and expansion of existing lines. Power
provided to the project areas would be derived from the Industrial Substation.
The Lodi Utility has sufficient capacity to meet increased energy demand generated by recent
and future annexations. Provision of electrical service to future annexations will require new
infrastructure, including the expansion of existing primary distribution lines and establishment
of service connections, which will be funded by the developer.
3-33
4 GROWTH AND POPULATION PROJECTIONS
This chapter identifies future growth projections for the City of Lodi and its SOI that need to be
taken into consideration when planning for the provision of services. A detailed discussion on
existing and future municipal services to meet the future demand identified in this chapter is
included in Chapter 3 of this MSR.
As discussed in Chapter 3, the City has plans and policies in place to ensure that if demand in
creases, as allowed by the General Plan, adequate public services will be provided, while existing
levels of service are maintained.
A. Population and Demographics
The population and employment growth trends are identified in Table 4-1. This table identifies
population trends within the County since 2000. The County experienced a great deal of growth
in the early 2000's that slowed during the economic downturn from 2007 to 2012.
Lodi is the fourth largest city in San Joaquin County, with a population of 70,668. Between 2000
and 2015, the City of Lodi's population increased by 12 percent to 63,719 as shown in Table 4-2.
The growth is consistent with the historical growth rate of 1% for the city. Growth was particularly
slow between 2010 and 2015.
Neighboring cities in San Joaquin County experienced more dramatic population growth between
2000 and 2015, with the cities of Stockton and Tracy increasing 26 and 50 percent, respectively.
Between 2000 and 2015, the population of San Joaquin County increased by 28 percent.
Demographic shifts experienced during this same time period in Lodi include an increase in per
centage of children and 35 to 54-year-olds, and an increase in family size and non-family house
holds, and an increase in residents of Hispanic/Latino origin. Table 4-2 identified household
trends in Lodi.
4-1
Table 4-1: Population Trends in San Joaquin County
Cities Years Percent Change 2000 -2021
2000 2010 2015 2020
Escalon 5,963 7,132 7,413 7,501 25.79
Lathrop 10,445 18,023 20,353 28,503 172.88
Lodi 57,011 62,134 63,719 69,624 22.12
Manteca 49,255 67,096 73,787 87,319 77.27
Ripon 10,158 14,297 14,922 16,292 60.38
Stockton 243,771 291,707 306,999 320,876 31.63
Tracy 56,929 82,922 85,296 98,601 73.19
Balance Of County 130,066 141,995 147,022 155,685 19.69
Total County 563,598 685,306 719,511 783,534 39.02
Table 4-2: Population and Household Trends in Lodi
2000 2010 2015 2022
Population 57,935 62,134 63,719 68,751
Housing Units 21,442 23,792 23,830 24,383
2.70 2.78 2.85 2.81
Average Household Size
(3.4% vacant) (7.1% vacant) (7.2% vacant)
Single Family Units 14,468 16,446 16,483
Multi-Family Units 6,475 6,908 6908
Mobile Homes 499 438 439 458
Source: State of California, Department of Finance, E-1 Population Estimates for Cities, Counties and the State with
Annual Percent Change -January 1, 2020, and 2021. Sacramento, California, May 2021.
The City of Lodi adopted a Growth Management Ordinance (GMO) in 1991 (Ordinance 1521,
1991). The intent of the GMO is to regulate growth in order that General Plan policies can be
achieved, to ensure the adequate provision of public services and facilities, and to promote in
creased housing options for all segments of the population. The GMO limits the number of ap
proved residential units to reflect a two-percent yearly population growth. This does not apply
4-2
to senior housing, commercial and industrial projects, on-site replacement housing, or projects
of four units or less.
The tables below summarize the population growth from 2010 to 2019 with data provided by the
American Community Survey and US Census.
B. Population Projections
There are several methods for projecting population growth. The tables below provide the pop
ulation projections for the City of Lodi, from 2019 through the 30-year horizon in 2052. The
tables represent projections based on the assumed annual growth rate of 1.5 percent as it pro
vides a middle ground between Lodi's historic growth rate and the maximum growth rate allowed
by the General Plan. Assuming a 1.5 percent growth rate, the City population will reach 80,570
by 2032, and 105,354 by the end of the twenty-year horizon in 2052.
Table 4-3 Population Projections
Year Population
2019 67,581
2020 68,595
2021 69,521
2022 70,459
2027 75,345
2032 80,570
2037 86,158
2042 92,133
2047 98,522
2052 105,354
The Lodi 2010 General Plan uses 2.7 persons per household to generate population estimates
from projected housing units. The 2021 numbers from the California Department of Finance uses
2.81 persons per household. For the purpose of this MSR, 2.83 persons per household is used
due the fact that most units are single-family residences. This does create different population
estimates for the City.
4-3
Table 4-4 Growth in Households
Growth in Households
Assumed Household Size: 2.83 persons per household
I
New Households 2022 -2032 4,443
I
New Households 2022 -2052 14,061
C. Development Projections
This section provides an overview of projected employment growth and residential development
to accommodate new residents in Lodi. Further detail related to development projections is pro
vided in Chapter 2.
1. Employment Growth
The tables below summarize the City's employment growth from 2010 through 2019, and the
County's projections for 2030 by employment type.
4-4
Table 4-5 Employment Growth Rate
E mp oyment G rowt h
2010 25,631
2019 28,917
--
Change 3,286
Annual Rate 1.35%
i '
2010 25,631 25,977
2011 25,977 26,328
2012 26,328 26,683
2013 26,683 27,043
2014 27,043 27,408
2015 27,408 27,778
2016 27,778 28,153
2017 28,153 28,534
2018 28,534 28,919
2019 28,919
Source: ACS/US Census
San Joaquin County Projections
All Industries
20201 2030 % Growth
330,9171 379,830 14.8%
Ann. Growth Rate: 1.5%
I '
Manufacturing
20201 2030 % Growth
20,8681 21,050 0.9%
Ann. Growth Rate: 0.1%
Professional and Business Services
20201 2030 % Growth
32,3321 36,856 14.0%
Ann. Growth Rate: 1.4%
Transportation and Warehousing '
20201 2030 % Growth
45,4341 58,274 28.3%
Ann. Growth Rate: 2.8%
'
Construction
20201 2030 % Growth
18,691 I 19,289 3.2%
Ann. Growth Rate: 0.3%
4-5
Based on historic City of Lodi trends and the projections of San Joaquin County, it is assumed
employment growth will continue at an average annual rate of 1.35 percent. The following table
projects employment levels in five-year increments, resulting in ten-year (2032) employment of
34,426 and 30-year employment of 45,016.
Table 4-6 Projected Employees
Projected
Year
Employees
2022 30,106
2027 32,194
2032 34,426
2037 36,814
2042 39,367
2047 42,097
2052 45,016
2. Recent Annexations
Recent annexations of the Reynold's Ranch, Westside and SW Gateway project areas includes
constructed and planned residential, commercial, and industrial development. These project ar
eas are expected to accommodate population growth in Lodi through approximately 2025.
Development of the Reynold's Ranch project site will induce population and housing growth, as
it entails the conversion of existing agricultural land to urban uses. However, the initial phase of
the project will emphasize retail and office development which will not substantially increase
population. No displacement of housing will result from this development. The development of
Reynolds Ranch project site would result in up to 1,084 units at buildout.
The land use designation for the Westside and SW Gateway project sites (including the 12 addi
tional parcels discussed in Chapter 1) under the General Plan is Planned Residential (PR). The PR
land use designation allows for single-family detached and attached homes, secondary residen
tial units, multifamily residential units, parks, open space, public and quasi-public uses, and other
compatible uses. According to the General Plan, residential development in PR designated areas
will maintain a mix of residential densities, with a goal of 65 percent low-density, 10 percent
medium-density, and 25 percent high-density. The development of these project sites is pro
jected to result in 2,000 units at buildout.
4-6
3. Sphere of Influence
As described in Chapter 2, the unincorporated areas of the SOI are based upon Chapter 2 of the
Lodi 2010 General Plan land use plan. General Plan development potential identifies the Unin
corporated SOI as containing approximately 4,000 dwelling units along with approximately 3,816
units within the existing City limits and with approved projects. The Department of Finance esti
mates 2015 demographics to include 23,830 dwelling units for the City. The current buildout of
the City and SOI boundary would include 7,816 dwelling units. The existing City Limits and Unin
corporated SOI would ultimately contain approximately 31,646 housing units.
Determination
The City of Lodi's General Plan, including the Growth Management Ordinance (GMO) discussed
above, provides a framework for future growth within the City and its SOI. The GMO limits the
number of approved residential units to reflect a two-percent yearly population growth. Histor
ically, the City has experienced one percent yearly population growth. The City's 2022 population
is estimated at 70,668 by the American Community Survey / US Census. Assuming a middle
ground growth rate of 1.5 percent growth rate, the City will reach 87,046 by 2035.
The 2022 City population is 70,668. The projected population of the City (year 2032) based on a
1.5% annual growth rate is 82,013. Residential lands within the City's currently designated 10
Year SOI provide adequate lands to accommodate this amount of development/population
growth. The projected City population in 30 years (year 2052) is 110,460. Residential lands in the
current SOI is not adequate to support this amount of residential development/population
growth. The City will consider future residential growth areas when it completes the next com
prehensive update of its General Plan and will consider amendments to its SOI to accommodate
30 year project population growth at that time.
The substantial majority of employment growth in the City is projected to occur in the East Study
Area, a proposed SOI expansion area that is designated Commercial, Business Park and Light In
dustrial by the City of Lodi General Plan. Based on analysis of existing employment uses in the
City of Lodi, it is estimated that employment development in the East Study Area will accommo
date an average of 6.47 employees per acre on average across the entire East Study area. With a
total of approximately 800 developable acres, the East Study Area could accommodate approxi
mately 5,200 employees.
4-7
5 FINANCING CONSTRAINTS AND OPPORTUNITIES
This section of the MSR evaluates the funding mechanisms available for the provision of ex
panded services in the City of Lodi to meet future needs for fire, police, public services, water,
wastewater and stormwater infrastructure, and electrical utilities. These fees and taxes ensure
adequate service levels to meet the needs of the existing and projected population.
A. Development Fees
The City of Lodi has negotiated Development Agreements for major development projects and
will use the same process for future projects with the developer's consent. These agreements
are relevant to all projects in which landowners agree to contribute to costs of facilities and
services, and the City agrees to provide service as required. The landowner's contribution to
these facilities and services is assessed by the City through Development Impact Mitigation Fees
(Development Fees), which ensure that new development pays its fair share of capital im
provement costs for public facilities and utilities needed to support additional growth. Devel
opment Fees are collected on a per acre basis, using Residential Acre Equivalents (RAE).
General Plan policies require the City to collect water, wastewater, drainage, and school devel
opment fees for all new residential, commercial, office, and industrial development sufficient to
fund required system-wide improvements (Land Use and Growth Management Element, Goal J:
Policy 2 and Goal I: Policy 7). Development fees are also collected from all new development
for capital improvements and equipment for fire and police protection (Health and Safety Ele
ment, Goal C: Policy 10 and Goal D: Policy 7).
New developments that are consistent with the Circulation Element of the General Plan are re
quired to pay their fair share of traffic impact fees and/or charges. In addition, developments
that generate more traffic than assumed by the Circulation Element are required to prepare
traffic studies and fund to any additional capital improvements identified by the study (Circula
tion Element Goal A; Policy 5).
The City also requires that new developments pay school impact fees or fulfill other commit
ments or obligations to the Lodi Unified School District (LUSD) as authorized by AB 2969, resolu
tion of the LUSD Board of Education (Land Use and Growth Management Element).
8. Tax Assessment
Previous to the passing of Proposition 13 in 1978, property taxes were the main source of local
government revenue and were subject to adjustment based on local government needs.
5-1
Proposition 13 reduced property taxes by approximately 50 percent and gave the State of Cali
fornia the power to allocate funds gained from taxes.
Proposition 98, which passed in 1988, mandated that a minimum funding level be maintained
by the State of California, which led to the Educational Revenue Augmentation Fund (ERAF)
property tax shift. EFAF transferred revenues from city, county and special districts to schools.
Between 1993 and 2005, ERAF resulted in the transfer of $17.5 million from the City of Lodi to
local schools.
The City of Lodi has a tax sharing agreement with San Joaquin County. This agreement ad
dresses the adjustment of the allocation of property tax revenue between the City and County
when a jurisdictional change occurs, such as annexation of unincorporated property into the
City limits. The Agreement was most recently updated in June 2005. The agreement specifies
property tax sharing for additional land annexed into the City, with allocations being deter
mined by the detachment of fire districts. The City receives 20 percent of property taxes for
annexations that involve a detachment from a fire district. Any such a detachment from an ex
isting service district would require LAFCo review and approval.
The City of Lodi currently collects the following taxes:
♦ Property
♦ Sales and Use
♦Transient Occupancy
♦ Franchise
♦ Documentary Transfer
♦ Motor Vehicle in Lieu
♦ Public Protection
♦ Business License
♦ In Lieu Franchise
In 2021, these taxes contributed over $56.6 million dollars to the City's total revenue and are
1
projected to provide for 80 percent of the General Fund for the 2021-2022 fiscal year. As of
2022, the City has initiated negotiations with the County to restructure the existing tax sharing
agreement. The City and the County have engaged a firm to provide technical studies to sup
port the negotiation and progress toward agreement has been made. The City recognizes that
1 City of Lodi Annual Budget FY 2021-2022
5-2
no annexation can be contemplated until the City and County reach agreement on sharing of
property tax revenues.
C. Connection and Usage Fees
In addition to impact fees and property taxes, Lodi receives funds for the on-going provision of
water, wastewater, and electricity service through connection fees and usage fees. The Lodi
Department of Finance reviews these fees on an annual basis to ensure that they reflect the
appropriate levels necessary to provide adequate levels of water, wastewater, and electricity
service. These fees are also discussed in Chapter 7, Rate Restructuring, of this MSR.
D. Mello-Roos Community Facilities Districts
The Mello-Roos Community Facilities Acts of 1982 was created in response to Proposition 13,
which limited a local agency's ability to fund needed improvements and services with property
tax increases based on assessed property value. This act provides an alternative financing
method by allowing local government agencies to establish Mello-Roos Community Facilities
Districts (CFDs} to finance needed improvements and services. CFDs are typically created in
undeveloped areas and can finance streets, sewer systems, basic utility infrastructure, police
and fire protection, schools, parks, libraries and other communities.
Mello-Roos CFDs are a requirement for the approval of residential maps, and therefore will be
created for Reynold's Ranch, Westside and SW Gateway project areas as well as future devel
opments within the SOI. These comprehensive CFDs will be used as a revenue source to offset
the cost of ongoing maintenance for public facilities, including those for police, fire,
parks/recreation, and public works.
The City has begun the process of updating its comprehensive CFD. The cost of services analysis
prepared to support City/County tax sharing negotiations provides the basis for updating the
CFD. Additionally, the specific demands unique to each annexation area (landscape areas,
parks, public facilities, drainage facilities, etc.) will be evaluated and the CFD rate for each an
nexation area will be calculated and will be applied when the subject area is annexed to the City
and annexed as a unit of land into the City's CFD.
E. Opportunities for Revenue Enhancement
In November 2018, the voters in Lodi approved Measure L providing much needed revenue to
maintain and enhance services in the community. Other revenue enhancing options are availa
ble, including Transient Occupancy, Business License, or additional Transactions and Use taxes.
All require a vote of the Council and the public and can be considered at Council direction. Giv
en the limited ability of the City to expand services in the face of known cost drivers, primarily
CalPERS UAL increases, additional revenue may be needed to provide the level of service de
manded by the community.
5-3
F. Determination
The City of Lodi receives funds for the provision of public utilities and services through impact
fees, property taxes, and connection and usage fees. These fees apply to all land that is an
nexed into the City. The City's Department of Finance reviews these fee structures on an annu
al basis to ensure that they provide adequate financing to cover the provision of city services.
The City has adequate fee structures and planning processes to ensure that the fee structures
remain sufficient to cover costs of required services, and thus no financial constraints to service
provision have identified. The General Plan includes policies that require new development to
pay its fair share capital improvement costs for water, wastewater, electricity, schools, fire pro
tection, and police protection facilities and services. The cost of providing on-going services for
annexed land is offset by the increased tax base provided by new development. Taxes, includ
ing property and sales tax, are expected to provide 80 percent of the City of Lodi's General Fund
for the 2021-2022 fiscal year.
5-4
6 COST AVOIDANCE OPPORTUNITIES
This chapter addresses methods that can be applied to minimize the cost-of-service provision
for fire protection, law enforcement, public services, water, sewer and stormwater drainage,
and electrical utilities, while still maintaining an adequate level of service.
A. Background
The City of Lodi provides fire and police protection, public services (transportation, libraries and
schools), water, wastewater, stormwater drainage, and electricity service within the City. The
City also provides limited services to areas outside the City boundaries. As property is annexed
into the City, the City will extend the service areas to include the annexed areas. The transfer
of service from existing provider to the City of Lodi may be phased in order to reduce costs.
This may increase overall cost to properties in the SOI, as residents and businesses in the SOI
would be receiving access to additional services not currently provided. Service providers in the
SOI are listed in Table 6-1.
Implementation of the City's General Plan and Growth Management Ordinance will ensure that
no new development will be approved without demonstrating the required infrastructure to
provide adequate levels of service is planned or in place. The cost of expanding infrastructure
and services will be minimized when new development is able to connect to existing service
systems.
Additional cost avoidance opportunities are being pursued by the Lodi Electric Utility and the
Lodi Fire Department, as follows:
• In July 2015 the City of Lodi Fire joined a Joint Powers Agreement (JPA) with the City of
Stock-ton Fire, Lathrop Manteca Fire District and the City of Manteca Fire Department.
Benefits of forming a JPA and then develop a governance structure that meets the needs of
the regional communications dispatch partnership. The formation of the group was specific
to the City of Stockton provide contract services to the JPA for emergency and non
emergency dispatch services under an Operational Agreement between the JPA and the
City. Each of these individual agencies is afforded equal representation on the JPA Board of
Directors. The JPA is a legal public entity that is separate for the City of Stockton and all the
member agencies. The JPA, is not limited to dispatch services alone, it could expand to cov
er fire training and equipment purchases. Furthermore, the JPA Board could engage addi
tional fire agencies for contract dispatch services.
• The City is also studying the potential for consolidation and contraction with the five sur
rounding fire districts. The Lodi Fire Department Strategic Plan identifies consolidation of
6-1
fire districts as having the potential to reduce overhead costs, increase efficiency and
spread cost of protection over a larger population area.
Table 6-1 Summary of Service Providers
Service Provided Before Annexation After Annexation
General Government San Joaquin County City of Lodi
Woodbridge, Mokelumne, and Liberty
Fire Protection Lodi Fire Department
Fire Protection Districts
San Joaquin County Sheriff's Depart
Law Enforcement Lodi Police Department
ment
Schools Lodi Unified School District (LUSD) LUSD
Libraries City of Lodi
San Joaquin Regional Transit District
Transportation City of Lodi, SJRTD
(SJRTD)
Water Woodbridge Irrigation District City of Lodi
Electrical Utilities PG&E Lodi Electric Utility
B. Determination
As annexation occurs, duplication of costs will be avoided by ensuring that all services to be
provided by the City will be removed from County responsibility. As discussed above, the City's
General Plan and Growth Management Ordinance ensure that all new development plans pro
vide the infrastructure and services necessary for population increases. Furthermore, the City
does not approve new development unless the required infrastructure needed to provide ade
quate levels of service is planned for or is in place.
As property is annexed into the City, the City will extend their service areas to include annexed
areas. While this may increase overall cost to properties in the SOI, residents and businesses in
annexed area receive a higher level of service and/or provision of services not available in unin
corporated areas of the SOI. The City is exploring ways to reduce the cost of transferring ser
vice providers through phasing.
Measures to reduce the cost-of-service provision and provide adequate services include selling
underutilized assets, consolidating service districts, and connecting new infrastructure to exist
ing systems. In addition to streamlining operations, retiring under-utilized equipment, and es
tablishing a policy for full cost recovery from developers for new facilities, the Electric Utility
6-2
implemented the following rate actions to better align costs and charges. These efforts will re
duce operation and maintenance costs. The potential for consolidation and contraction with
the five surrounding fire districts is discussed in more detail in Chapter 7. Rate Restructuring.
Such actions have the potential to reduce overhead costs, increase efficiency and spread cost of
protection over a larger population area.
6-3
7 RATE RESTRUCTURING
The purpose of this chapter is to determine the potential for minimizing the rates charged to
customers for public services, while maintaining the same level of service or achieving a better
level of service. As discussed in Chapter 3, the City of Lodi funds its fire and police departments
exclusively through the General Fund as opposed to a fee charged for usage of the service. There
fore, these services are not included in the discussion below.
A. Water and Wastewater
The city provides annexed properties with water and wastewater services. As discussed in Chap
ter 5 of this MSR, development impact mitigation fees fund the capital improvements needed to
connect new developments to the City's water and wastewater infrastructure. Service charges
are collected by the City to pay for ongoing services. Fixed rates are established for single-family
and multi-family residential units, based on the number of bedrooms per unit. Flat rates for
commercial and industrial customers are based on meter size.
The City is installing water meters on un-metered properties in its service area. In accordance
with California Assembly Bill 2572, the City must install water meters on all customer connections
by 2025. Installation of meters will enable the City to charge water customers based on actual
use, which is expected to result in a 10 to 40 percent reduction in water use, with 15 percent as
most typica I.
The City plans to expand SWTF capacity from 10 MGD (or 36.1 AFD) to 20 MGD (or 61.4 AFD)
around 2030 or demand when needed to meet demands. This project would include new water
supply agreements to increase the City's surface water supplies beyond 6,000 AFY. Additionally,
new storage tanks at wells 23 and 28 push back or potentially eliminate the need to construct
new wells, which were determined to be needed by 2035 to meet demands in the City's Water
Master Plan.
8. Electricity
The Electric Utility Fund is used to account for all activities related to providing electric services
to Lodi residents and businesses. Those services include the cost of purchasing electricity; design,
construction, and maintenance of electric infrastructure (overhead and underground); customer
service; engineering; administration; and debt service. The electric utility is funded by rates
7-1
charged for the electric services provided. A portion of the rates are designed to support infra
structure expenses and other rates are charged based on usage.
The Electric Utility implements a number of strategies to maintain affordable, equitable rates and
ensure sufficient reserves are available to address emergencies or unplanned expenses. In addi
tion to streamlining operations, retiring under-utilized equipment, and establishing a policy for
full cost recovery from developers for new facilities, the Electric Utility implemented the follow
ing rate actions to better align costs and charges. In 2016, the utility eliminated the minimum
bill, implemented a new fixed charge and reduced the number of energy tiers from 5 to 3. In an
effort to avoid cost shifts associated with net energy metering, Lodi Electric implemented a new
solar tariff (LMC Section 13.20.290) in 2017 whereby customers installing generation facilities of
1 megawatt or less would be required to pay all costs associated with the interconnection of their
system and installation of a solar meter which will register "delivered" energy that will be charged
to a customer at regular retail rates and "received" energy that will be credited at the avoided
cost of said energy for excess energy delivered to the utility's distribution grid from the customer
generator.
In addition, the electric utility has a City Council approved Reserve Policy, reviewed every three
years, which requires the utility to maintain a level of reserves equal to 90 days operating cash,
a $1M capital contingency reserve as well a level of reserves included as part of the annual budget
process for unexpected and/or extraordinary power supply expenses -the amount of which is
calculated each year.
The electric utility's current service rates are compared with PG&E rates in Table 7-1. The Utility's
rates are lower than PG&E rates for residential, commercial, industrial and systems users. Based
on this comparison, the Utility is providing adequate service to Lodi residents for rates that are
fair and reasonable.
Table 7-1 Comparison of Expected Utility Rates (cent/kWh)
Residen-
Commercial Industrial
tial
Lodi Electric
17.6 18.4 13.4
Utility
PG&E 27 25 18
Lodi Utility
rates as percent 65.1% 73.6% 74.4%
of PG&E rates
Source: 2019 study completed by Michael Bell Management Consulting for Northern California Power Agency
7-2
C. Determination
The City of Lodi sets rates and fees for water, wastewater, and electricity. The City's Finance
Department is responsible for reviewing, analyzing and evaluating financial policies and proce
dures. The installation of water meters and implementation and exploration of an Energy Cost
Adjustment evidence the City's commitment to minimizing rates charged to customers for utili
ties and public services. In addition, the comparative electricity rates shown in Table 7-1 show
that Lodi Electric Utility is charging fair and reasonable rates to customers.
The City reviews the fees it charges for water, wastewater, and electricity on an annual basis to
ensure that adequate services are provided in a cost-effective manner. Currently, fixed rates for
water and wastewater are established for single-family and multi-family residential units, and
flat rates for commercial and industrial customers are based on meter size. Installation of water
meters, in accordance with Assembly Bill 2572, will enable the City to charge water customers
based on actual use, which is expected to result in an average 15 percent reduction in water
demand. Increased water rates for 2021-2022 are helping to cover the cost of PCE/TCE contam
ination.
7-3
8 OPPORTUNITIES FOR SHARED FACILITIES
Currently, the City of Lodi provides the appropriate level of fire protection, police, schools, librar
ies, transportation, water, sewer, stormwater, and energy in a cost-effective manner within the
City limits. In a few cases, the City provides services to areas outside the City limits. The Lodi
Unified School District provides service to Lodi, North Stockton, and the unincorporated commu
nities of Acampo, Clements, Lockeford, Victor and Woodbridge.
The focus of this section is to identify opportunities for reducing overall costs and improving ser
vices by sharing facilities and resources. The following outlines existing and potential opportuni
ties for the City of Lodi to share facilities and resources.
A. Background
The City has already identified opportunities for reducing overall costs and/or meeting General
Plan goals through sharing facilities with other agencies and establishing multi-use facilities.
1. Fire Department
Additional fire stations will be proposed to address the ultimate sphere boundaries, as stated in
the department's Strategic Plan, Strategic Planning Topic #5, Objective 1: Facilitate the planning
and construction of a new Fire station facility. The expanded tax base that results from new de
velopment, as well as the continuation of the residential Community Facilities Districts, will pro
vide funding for fire services. Development fees will address the capital cost of new fire facilities
and equipment.
2. Police Department
The development of recent annexations will result in additional demand for police service. The
additional operations costs that result will be provided by the expanded tax base that results
from new development, as well as the continuation of the residential Community Facilities Dis
tricts. Capital costs for facilities and equipment will be funded by development impact mitigation
fees.
3. Water Supply and Distribution
The City, which solely relied on groundwater historically, has increased its use of surface water
such that it accounts for almost half of the City's supplies. The City plans to expand SWTF capacity
from 10 MGD (or 36.1 AFD) to 20 MGD (or 61.4 AFD) around 2030 or demand when needed to
8-1
meet demands. This project would include new water supply agreements to increase the City's
surface water supplies beyond 6,000 AFY.
4. Wastewater Treatment
Consistent with the General Plan land uses, water, sewer, wastewater treatment, recycled water,
and stormwater facilities are planned and sized assuming a reasonable growth rate and develop
ment potential, which for the Urban Reserve areas includes: the industrial areas reaching a 50%
level of development and the residential areas reaching a 75% level of development. These facil
ities are briefly described in General Plan Table 3-6. Though facility planning and sizing will need
to be refined and verified though preparation of a detailed wastewater master plan.
5. Stormdrain System
The stormwater plan for the reasonable development of the General Plan includes the division
of the City's growth areas into 16 drainage watersheds. For each of these watershed areas, the
tributary trunk drain, detention basin, discharge rate (gravity flow or pump station), and outfall
pipeline have been preliminarily sized. These facilities are briefly described in General Plan Table
3-6, though facility planning and sizing will need to be refined and verified though preparation of
a detailed stormwater master plan.
B. Determination
As stated in Table 8-1, the City of Lodi has existing and planned shared facilities, both within the
City and through relationships with other service providers, including San Joaquin County. These
shared facilities include the Lodi Police Department Headquarters that will house the San Joaquin
County Superior Court, the City's contracts with the Woodbridge Irrigation District (WID) for sur
face water from the Mokelumne River and use of the WID canal for stormwater drainage, the
City's agreement to provide wastewater treatment services to Flag City, and combination storm
water basins and parks.
Multiple planning processes are in place to identify future opportunities for shared facilities that
will improve levels of service in a cost-effective manner and contribute to meeting General Plan
goals. These planning processes include the City's annual budgeting process, the planning pro
cesses for utilities (i.e., water services, wastewater services, electric utility), and for fire and po
lice services.
8-2
Table 8-1 Shared Detention Basin and Park Facilities
Description/ Park Amenities
Existing Park/Basin
Baseball fields, tennis and basketball
A-1, Kofu
courts, skate park, picnic area, restrooms
Baseball and soccer fields, dog area, play
A-2, Beckman
area, picnic area, restrooms
Baseball and soccer fields, dog area, re
B-1, Vinewood
strooms
Baseball and soccer fields, play area, picnic
B-2, Glaves
area, restroom
Baseball and soccer fields, play area, picnic
D, Salas
area, restroom
Baseball and soccer fields, inline hockey,
E, Peterson tennis and basketball courts, play area,
picnic area, restroom
Planned Basins
C, Pixley Approved Community Park
F (at Kettleman)
F (near Tokay)
G, DeBenedetti Approved Community Park
Source: City of Lodi Stormwater Management Program, 2003.
8-3
9 GOVERNMENT STRUCTURE
This section analyzes the benefits and constraints of the Lodi government structure in regard to
the provision of public services. As previously noted in this MSR, the City of Lodi, San Joaquin
County, and several special districts and municipal service districts provide services and infra
structure within the SOI.
As discussed in Chapter 6, the City is studying the potential to provide contract services for the
Woodbridge Fire District and employ all firefighters currently employed by Woodbridge Fire
District, in order to enhance the level of service provided to areas currently in the Woodbridge
Fire District.
A. Background
1. City of Lodi
The City of Lodi governs within its incorporated boundaries. Residents ultimately oversee the
provision of public services within the City's jurisdiction as the City is run by an elected City
Council who answer to the public through the electoral process. Annexed properties within the
City's SOI are provided with a wide range of public services including municipal water, sewer,
and stormwater drainage. Therefore, annexation increases the potential for services to be
made available to unincorporated areas of the SOI. In the case of fire protection, the structure
of the City's services includes several districts that may benefit from consolidation as annexa
tion occurs.
2. San Joaquin County
San Joaquin County Service Maintenance Districts are governed by the San Joaquin County
Board of Supervisors, which sets rates and fees within the service districts and ensures ade
quate service is provided to customers. These districts include parks, lighting and maintenance,
drainage, wastewater collection and treatment. As annexation occurs, San Joaquin County ser
vices will be taken over by the City as it merges County services areas into its own service sys
tems. Table 6-1 lists the County districts within the SOI that will be transferred to the City after
annexation.
3. Other Districts and Municipal Service Providers
In addition to the City of Stockton and San Joaquin County, there are several other special dis
tricts and municipal infrastructure and service providers in the SOI (i.e., Woodbridge, Moke-
9-1
lumne, and Liberty Fire Protection Districts, San Joaquin Regional Transit District (SJRTD). These
other service providers include water districts, wastewater collection and treatment districts,
and fire districts.
4. Practices and Performance
The City of Lodi, San Joaquin County, and several other special districts and private utility com
panies (i.e., PG&E) provide services and infrastructure within the incorporated and unincorpo
rated areas of the SOI. Expansion of urban development within the SOI is dependent upon the
extension of infrastructure and provision of services from the City of Stockton. As an incorpo
rated city, the Lodi City Council establishes fee structures and directs the provision of police,
fire, water, wastewater, and stormwater drainage services based on service level goals and
standards.
The City intends to work with property owners and the County to annex all areas within its SOI
to consolidate services and increase efficiencies and infrastructure and service deliveries. As
planned development occurs within the SOI, the City will extend and expand infrastructure and
services logically and efficiently pursuant to the City's General Plan and supporting master
plans. Provision of infrastructure and services by the City within the SOI will not duplicate or
conflict with the provision of infrastructure or services by other providers, as stated in General
Plan Policy GM-P6 -"Annex areas outside the existing sphere of influence to conform with de
velopment needs for Phase 1, Phase 2, and Phase 3. Subsequent phases shall be annexed as
current phases reach development thresholds."
Infrastructure and services that will be provided with annexation will, in most cases, enhance
those services currently available; however, there may also be a corresponding increase in ser
vice fees. The City's General Plan goals and policies support the City's intention to annex and
provide services within the SOI and provide services in a cost-effective manner. The City is
committed to provide City services and facilities within the SOI upon annexation in conform
ance with City Council adopted policies and master plans. For unincorporated islands within the
city limits, the City is committed to working in good faith with all stakeholders, including prop
erty owners, members of the public, and other government agencies, to prepare feasibility
studies regarding the annexation of these islands.
8. Management Efficiencies
The City undertakes long-range planning programs to better plan and budget for needed im
provements to services and facilities. For example, the City's General Plan identified the poten
tial for growth and establishes the baseline for other plans, such as water and sewer master
9-2
plans. Using these long-range plans as a basis, the City uses its annual budgeting process to bal
ance expenditures for provision of needed services with anticipated income. During this pro
cess, the City analyzes the need for City staffing, equipment and facilities for the following year,
and department heads are encouraged to continually explore methods to minimize the cost for
services while maintaining a high level of service.
C. Government Accountability
The City of Lodi was incorporated in 1906 as a Charter City. Today Lodi operates under a Man
ager/Council form of government with 421 employees budgeted for Fiscal Year 2021-22.
The City of Lodi is a general law city, governed primarily by the laws of the State of California
and by its own ordinances and regulations. The City Council establishes local laws, sets policies,
approves programs, appropriates funds, supervises the operations of City government. City
Council Members are elected on a by-district basis from five single-member Council districts by
voters residing in the district in which the Council Member resides (learn more about Council
Districts}. Council Members hold four-year terms. Elections for members of the Council are held
in November of even-numbered years. There is no limit to how many terms a person may serve
as a Lodi City Council Member.
Actions of the City Council, including opportunities for public involvement and public hearing,
are regulated in accordance with the Brown Act (California Government Code Section 54950 et
seq.}, other applicable statutes and regulations, and City procedures. The City Attorney is re
sponsible for ensuring compliance with the Brown Act and the City's governing codes.
D. Determination
Since the City of Lodi is an incorporated city, the City Council will make final decisions concern
ing fee structures and provision of services. As discussed in previous chapters, the City of Lodi
reviews its fee structures on a regular basis. The City's General Plan also has numerous goals,
objectives, policies and actions to ensure that adequate services are provided in a cost-effective
manner to accommodate new growth.
The residents of Lodi have a range of opportunities to oversee the activities of elected, ap
pointed, and paid representatives responsible for the provision of public services to the com
munity through elections, publicized meetings and hearings, as well as through the reports
completed in compliance with State and federal reporting requirements.
9-3
The City has demonstrated the ability to work with other service providers and districts to en
sure that adequate services are provided in a cost-effective manner. Efforts to ensure effective
government structure for the provision of schools, fire protection, and water supply demon
strate the City's foresight to plan for future service needs as City boundaries expand due to an
nexations and population increases. Assuming that the City continues to evaluate the existing
government structure and seeks opportunities for improvement, no significant barriers are ex
pected in regard to government structure during the five-year sphere horizon.
The City has implemented successful mergers and continues to explore opportunities to work
with other service providers. Since the merging of 18 elementary school districts and the Union
High School District in 1996 to form LUSD, the district has obtained over $100,000,000 in State
bond funds for construction and renovation of school facilities. The City is currently exploring
the potential to contract services for the Woodbridge Fire District. These efforts demonstrate
the City's efforts to work with other districts to provide cost-efficient, high-level service within
the City and its SOI.
9-4
10 EVALUATION OF MANAGEMENT EFFICIENCIES
Efficiently managed entities consistently implement plans to improve service quality while con
taining costs. The purpose of this section is to evaluate the City of Lodi's functions, operations,
and practices as they pertain to the ability of the City to provide quality services to meet cur
rent and future demand.
LAFCo is required to consider the advantages and disadvantages of any options that might be
available to provide the services. In reviewing potential government structure options, consid
eration may be given to financial feasibility, service delivery quality and cost, regulatory or gov
ernment frameworks, operational practicality, and public reference.
A. Background
The City of Lodi undertakes long-range planning programs to better plan and budget for needed
improvements to services and facilities. The 2010 Lodi General Plan - Growth Management
and Infrastructure Element, Parks Recreation and Open Space Element and the Safety Element
include implementation programs which outline schedules for service review, as summarized in
Table 10-1. The timeframe for service reviews ranges from ongoing to every 5-10 years.
Table 10-1: Schedule for Service Review
Task Responsibility Time Frame
Capital Improvement Program that
identifies and sets priorities for wa- Planning Department
Ongoing
ter, wastewater, and drainage im- Public Works Department
provements
City Council
Urban Water Management Plan Every 5 years
Public Works Department
City Council
Water Master Plan Update Every 5-10 years
Public Works Department
City Council
Wastewater Master Plan Update Every 5-10 years
Public Works Department
City Council
Drainage Master Plan Update Every 5-10 years
Public Works Department
Review fee ordinance for funding
City Council
needed for water, wastewater Every 5 years
Public Works Department
drainage, and other improvements
10-1
Table 10-1: Schedule for Service Review (Cont.)
Task Responsibility Time Frame
Review of fee ordinance to provide City Council
funding for capital improvements
Fire Department Ongoing
and equipment for fire and police
protection Police Department
Public Works Department
The City's annual budgeting process is used to balance expenditures for provision of needed
services with anticipated revenue. During this process, the City analyzes the need for City staff
ing, equipment and facilities for the following year, and department heads are encouraged to
continually explore methods to minimize the cost for services while maintaining a high level of
service. The annual budget is used as a planning tool by the City.
8. Determination
The 2010 Lodi General Plan identified a reasonable growth area for the 25-year planning hori
zon and the necessary infrastructure to serve this area and population. The 2010 General Plan
sets a baseline for other planning documents, and the annual City Budget and regular service
reviews will ensure that the City of Lodi continues to provide adequate levels of service in a
cost-effective manner within its service area. The City's annual budgeting process balances ser
vice expenditures and analyzes the need for City staffing, equipment and facilities for the fol
lowing year.
The ability to serve the anticipated growth within the SOI is not expected to have a significant
effect on governmental structure of the City or its ability to provide services. Mechanisms are in
place within City departments to effectively provide for public participation in the planning and
development process to address growth within the SOI. The City will continue to work with ser
vice providers such as the LUSD, SJRTD, PG&E and others, to address government structure op
tions to provide efficient and cost-effective public facilities and services.
The City of Lodi General Plan has numerous goals, objectives, policies and actions to ensure
that adequate services are provided in a cost-effective manner to accommodate new growth,
and implementation programs that include schedules for review of capital improvement pro
grams and fee ordinances for funding infrastructure improvements. Implementation programs
also provide schedules for updating the City's Water Master Plan, Wastewater Master Plan, and
Drainage Master Plan. Timeframes for service reviews ranges from ongoing to every 5-10
years. These long-term planning processes for the City of Lodi are contributed to by city de-
10-2
partments and community input. The City will continue to use these processes to ensure man
agement effectiveness, and to meet goals, objectives and policies established by the General
Plan.
The City's current management process is adequate and meets the needs of the City. The City
has demonstrated the ability to work with other service providers and districts to ensure that
adequate services are provided in a cost-effective and well-planned manner. Efforts to ensure
effective government structure for the provision of fire and police protection, transportation,
water supply, wastewater treatment, and storm drainage facilities demonstrate the City's fore
sight to plan for future service needs as City boundaries expand due to annexations and popula
tion increases. The City will continue to evaluate the existing government structure and seek
opportunities for improvement. Therefore, no significant barriers are expected in regard to
government structure during the 10 and 30-Year Horizons.
10-3
11 LOCAL ACCOUNTABILITY AND GOVERNANCE
This section assesses the level of accountability provided by the City of Lodi to those it serves,
focusing on the public accessibility and level of public participation offered in regard to the op
eration of the City.
A. Background
The City of Lodi was incorporated on December 6, 1906. The City of Lodi is a General Law city
that operates under the City Council/City Manager form of municipal government with 391
employees budgeted for 2015-2016. This general law format allows for citizens to elect a gov
erning body that will set policy, pass ordinances and resolutions, and approve fiscal spending.
The City of Lodi has five elected officials. The City Council consists of the Mayor (Mayor Pro
Tempore) and three council members and is the City's governing body having primary respon
sibility for enacting legislation and policies. The City also has an elected City Treasurer. The
Mayor is elected by fellow council members on an annual basis, and City Council Members are
elected for four-year terms. However, there are no term limits for the Mayor or City Council
Members. Regular City Council meetings are held on the first and third Wednesday of every
month at 7:00 p.m. at the Carnegie Forum, located at 305 W. Pine Street. Council meetings are
broadcast live on SJTV Channel 26 and rebroadcast the following Friday at 3:00 p.m. In addition
to council meetings, informational sessions ("Shirtsleeve sessions") are held most Tuesdays at
7:00 a.m., also at Carnegie Forum.
The City Council appoints a seven-member Planning Commission, of which each member serves
a four-year term. Established by State law, the purpose of the Planning Commission is to review
changes to the City's General Plan and zoning regulations to ensure the development in Lodi is
of the highest quality and to provide recommendations to Council on such matters dealing with
community development. The Commission is responsible for holding public hearings that elicit
public comment on development plans. The Commission meets the second and fourth
Wednesday of every month at 7:00 p.m., also at the Carnegie Forum.
The City of Lodi has additional boards, commissions and committees that advise the City Coun
cil. Registered voters of San Joaquin County are invited by the City to apply for positions on
boards, commissions and committees as they become available.
11-1
The official City Council meeting agenda is posted at least 72 hours before regular meetings and
at least 24 hours before special meetings, according to Government Codes sections 54954.2
and 54956. The official City of Lodi posting location is at the Lodi Carnegie Forum, located at
305 W. Pine Street, where it is available to the public 24 hours a day. Additional posting loca
tions include Lodi City Hall and the City Clerk's Office, both located at 221 W. Pine Street, and at
the Lodi Public Library, located at 201 W. Locust Street. Agendas are also posted on the City's
website.
City Council Guidelines allow for public comment during City Council meetings for both agenda
and non-agenda items. However, public comment time for non-agenda items is limited to five
minutes (Council Guideline #1). The pubic may contact the City Council via written correspond
ence, including e-email, or verbal correspondence (voice mail). Written correspondence sent to
any member of the City Council by a member of the public is forwarded to the Mayor, each
Council Member, the City Manager, City Attorney, and any affected Department Heads (Council
Guideline #2).
City Hall, the primary location for City administrative function, is located at 221 West Pine
Street and is open from 7:30 a.m. to 5:30 p.m., Monday through Thursday and alternating Fri
days from 8:00 am to 5:00 pm. The City provides its residents with information on City policy
and upcoming opportunities for public involvement on its website an on SJTV Channel 26. In
addition, residents are notified as required by law for public hearings.
The City prepares annual reports according to State and federal regulations on General Plan
implementation process, water quality, growth for the Department of Finance, and Community
Development Block Grant (CDBG) implementation. These reports are available to the public for
review and comment.
8. Determination
The City of Lodi is a General Law city that operates under the City Council/City Manager form of
municipal government, and therefore residents of Lodi are offered a range of opportunities to
oversee the activities of elected, appointed and paid representatives responsible for the provi
sion of public services to the community through elections, noticed meetings and hearings, as
well as through the reports completed in compliance with State and Federal reporting require
ments. The City's website provides up-to-date public access to meeting agendas, service de
partments, documents for public review, and other resources. Annual City reports on General
Plan implementation process, water quality, growth, and Community Development Block Grant
(CDBG) implementation are also made available for public review and comment.
11-2
The City has five elected officials, including the mayor and four council members, and holds
council meetings twice a month. Additional informal sessions are held every week. Council
guidelines allow for limited public comment during City Council meetings. The resident-elected
City Council appoints a Planning Commission to provide recommendations to Council on such
matters dealing with community development.
The City of Lodi is an incorporated city, and the City Council makes final decisions concerning
fee structures and provisions of service. Actions of the City Council, including opportunities for
public involvement and public hearings, are regulated in accordance with the Brown Act (Cali
fornia Government Code Section 54950 et seq.), other applicable statues and regulations, and
City procedures. The residents of Lodi are offered a wide range of opportunities to oversee and
provide input on the activities of elected, appointed, and paid representatives responsible for
the provision of public services to the community through elections, noticed meetings and
hearings, as well as through the reports completed in compliance with State and Federal re
porting requirements.
11-3
Department of Public Works
SANiJOAOUIN
Fritz Buctwnan, Director
-COUNTY-
Greotness grows here. Wamna bYOU Alex Chetfey, Deputy Director -Development
David Tolliver, Deputy Director -Operations
Najee Zarif, Deputy Director -Engineering
Kristi Rhea, Business Administrator
September 27, 2022
MEMORAN DUM
TO: James E. Glaser, Executive Officer
LAFCo
CH
FROM: Christopher RM Heylin, PE., Development Services Engineer
Development Services Division
SUBJECT : DRA FT MUNICIPAL SERVICE REVIEW AND SPHERE OF I NFLUENCE UP DATE
-CITY OF LODI
LOCATION : Unicorporated areas around City of Lodi
COMMENTS:
• Sunnyside Estates, a County Maintenance District, is currently surrounded on 3 sides by
the City of Lodi and the 10 year SOI indicates it will be completely enveloped. At what
point does LAFCo move forward with annexation to avoid creating a small County island?
CH:SC
X:\LAFCO\LAFCo Referrals\Drafi Municipal Service Review and Sphere of Influence Update• City of Lodi'Commenl.J to LAFCo.doc
1810 East Hazelton Avenue I Stockton, California 95205 I T 209 468 3000 I F 209 468 2999
II Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks