LAFCO
city-of-escalon-MSR---SOI-update
Read the report at Local Agency Formation Commissions ↗
!:xhibit A
October 2022
Submitted by:
0
J.B. ANDl:RSON �
.. US[ PLANNING
CITY OF ESCALON MUNICIPAL SERVICE REVIEW
and SPHERE OF INFLUENCE PLAN
TABLE Of CONTENTS
EXECUTIVE SUMMARY ................................................................................................2
1. Introduction ...................................................................................................... 9
SPHERE OF INFLUENCE PLAN
2. Sphere Of Influence Plan ................................................................................ 18
MUNICIPAL SERVICE REVIEW
3. Growth And Population Projections .............................................................. 26
4. Location and Characteristics of any Disadvantaged Unincorporated
Communities within or Contiguous to the Sphere of Influence ............... 31
5. Present And Planned Capacity of Public Facilities and Adequacy
Of Public Services. Including Infrastructure Needs or Deficiencies ........... 35
6. Financial Ability of Agencies to Provide Services ........................................ 60
7. Status Of. And Opportunities For. Shared Facilities 75
8. Accountability For Community Service Needs. Including
Governmental Structure and Operational Efficiencies ............................. .77
9. References ........................................................................................................ 80
LIST Of EXHIBITS
Exhibit 1-1 City Limit and Existing Sphere of Influence ........................................1 3
Exhibit 1-2 Proposed Sphere of Influence .............................................................1 4
Exhibit 1-3 Existing Area of Interest .........................................................................1 7
Exhibit 2-1 Existing Land Use ....................................................................................2 3
Exhibit 2-2 Proposed Land Use ...............................................................................2 4
Exhibit 4-1 Boundary of Census Tract No. 49.01 and 49.02 ................................. 32
Exhibit 5-1 Escalon Fire Protection District Boundary ...........................................3 8
Exhibit 5-2 Proposed Wastewater Collection System Expansion ....................... 51
Exhibit 6-1 Storm Drainage Areas ........................................................................... 63
LIST Of TABLES
Table 2-1 Historic Population ................................................................................. 18
Table 2-2 30-Year Average Annual Population Projections ............................. 19
Table 2-3 General Plan Land Use by Planning Horizon ..................................... 20
Table 2-4 Projected New Residential Possible Dwelling Units ..........................2 1
Table 2-5 Evaluation of Projected Acreage and Dwelling Units ......................2 1
Table 3-1 Population and Household Projections .............................................. 26
Table 3-2 Population Projections ..........................................................................2 7
Table 4-1 Household Median Income -American Community Survey. ......... 33
Table 4-2 Household Median Income by Census Tract .................................... 34
Table 4-3 Household Median Income by Census Block Group ....................... 34
Table 5-1 Projected Water Demands .................................................................. 43
Table 5-2 Average Daily Water Useage ............................................................. .44
Table 5-3 Summary of Well Capacity .................................................................. 44
Table 5-4 Projected Wastewater Flow ................................................................. 50
Table 5-5 Proposed Sewer System Improvements ............................................. 53
Table 6-1 Development Impact Fee Summary for New Development .......... YJ
Table 6-2 Water Connection Fee .........................................................................6 1
Table 6-3 Sewer Connection Fee .........................................................................6 1
Table 6-4 Storm Drain Connection Fee ....................................................6 2
EXECUTIVE SUMMARY
This Municipal Service Review (MSR) has been prepared in accordance with Section
56430 of the California Government Code as a means of identifying and addressing the
relationships among regional issues, goals and objectives and various service options
associated with the City of Escalon's Sphere of Influence. The City of Escalon last
updated its MSR in 2011. Recently, in 2019, the City of Escalon updated their General
Plan to address anticipated growth and to prioritize development areas. The updated
General Plan has resulted in the need to amend the SOI to adequately accommodate
planned growth commensurate with the 2019 General Plan Update.
This MSR reviews the City's ability to provide services to residents and businesses within its
existing boundaries as well as the future residents and businesses within 10-Year and 30-
Year growth horizons.
The Cortese-Knox-Hertzberg (CKH) Local Government Reorganization Act of 2000
requires that a Municipal Service Review (MSR) be prepared prior to or concurrent with
an update of a Sphere of Influence (SOI). The MSR evaluates existing and future service
conditions and reviews the advantages and disadvantages of various government
service structure options in the form of written determinations. This MSR will be used by
San Joaquin LAFCo to consider the minor modifications to the adopted SOI for the City
of Escalon.
The purpose of the MSR is to review the City's ability to provide services to the residents
and businesses within its existing boundaries as well as future residents and businesses
within the proposed Sphere of Influence. An MSR provides the basis for modifying the
City's Sphere of Influence based on factual information bridging the gap between
General Plan Policies and statements of intent with declaratory statements of facts
represented to the Commission.
The MSR is required by the CKH Act and San Joaquin LAFCo's "Service Review Policies"
updated December 14, 2012, to consider six (6) determinations. Each of these
determinations requires a written evaluation of facts by the City of Escalon. The six (6)
determinations are as follows:
1. Growth and population projections for the affected area.
2. The location and characteristics of any disadvantaged unincorporated
communities within or contiguous to the Sphere of Influence.
2
3 . Present and planned capacity of public facilities and adequacy of public
services. including infrastructure needs or deficiencies.
4. Financial ability of agencies to provide services.
5. Status of. and opportunities for, shared facilities.
6. Accountability for community service needs. including governmental structure
and operational efficiencies.
DETERMINATIONS
The following determinations cover each of the six (6) areas required to be addressed in
pursuant State law and Son Joaquin LAFCo policy. The following determinations are
based on the information presented in this MSR:
_Growth and P0.12ulatjon Projections for the Affected Area
The Escalon General Plan. originally approved in 2005, estimated the population in
Escalon will reach approximately 8,825 by 2015 and 11,950 by the year 2025. Population
estimates vary widely for Escalon as growth has slowed dramatically between 2000 and
2021 to about 0.98% per year. The 2021 Department of Finance (DOF) E-5 Report suggest
that the population for Escalon was 7,501 persons. This conforms with the findings of the
University of Pacific. Center for Business & Policy Research, forecasts prepared for San
Joaquin County Council of Governments of September 10. 2020 (UOP). UOP projections
provided a conservative approach to Escalon's population growth and suggest it could
reach 8.452 by 2030 and 8.9 27 by 2050.
On September 22. 2022, the San Joaquin Council of Governments (SJCOG) approved
the Final Regional Housing Needs Plan (RHNP) for the Housing Element 61h Cycle of 2023
- 2031. The Regional Housing Needs Allocation (RHNA) sets forth the total number of
housing units that each city and the unincorporated county must plan for during the 61h
cycle planning period (2023 - 2031 ). The RHNP is the official assignment of total units to
the jurisdictions in San Joaquin County. For this cycle (6th the allocation covers the
),
projection period beginning June 30, 2023, and ending December 31, 2031. For Escalon.
the total number of RHNA is 367 units. including a total of 146 Lower Income (Below
Market Rate (BMR)) and 221 Higher-Income (Moderate & Above-Moderate Income).
Planning for these units over the course of the 61h Planning Period will be achieved
through the City of Escalon Housing Element Update.
The General Pion Update of 2019 along with the Growth Management Ordinance (GMO)
provides the framework for future growth within the City and its potential Sphere of
Influence. To that end, the General Plan includes a policy that states the City shall
conform to the Growth Management Ordinance. By following the adopted GMO. the
City will maintain an average annual absorption rate over the life of the General Plan of
2.5%. We have set the GMO growth projections as the maximum design population and
thus guides population projections for 2030 and 2050.
3
Escalon will continue to review future growth and population patterns on a regular basis
and monitor growth within its adopted SOI. In this regard, the City regularly files the
Housing Element Annual Progress Report (APR) to the State Department of Housing and
Community Development (HCD) each year. The Housing Element APR includes the status
and progress in implementing the Housing Element. The City will continue to file the
Housing Element APR each year in compliance with Government Code Section 65400.
Location and Characteristics of any Disadvantaged Unincorporated Communities within
or-Contiguous to the Sphere of Influence
SB 244 requires the identification and description of all "disadvantaged unincorporated
communities" (DUC's) located within or contiguous to the existing Sphere of Influence of
cities and special districts that provide fire protection, sewer, and/or water services.
Disadvantaged unincorporated communities are defined as inhabited unincorporated
areas with an annual median household income that is 80% or less than the statewide
annual median household income. The identified disadvantaged unincorporated
communities are required to be addressed by LAFCo when:
• Considering a City Annexation proposal involving l O acres or more with an
existing disadvantaged unincorporated community contiguous to the proposed
area; and
• Approving Sphere of Influence and municipal service review determinations
associated with the updated or established Sphere of Influence for local
agencies subject to SB 244 requirements.
According to the City of Escalon Environmental Justice White Paper, prepared by
DeNovo Planning Group in 2019 in preparation of the General Plan Update, Census Tract
No. 6077004902 is considered a DUC. The portion of this DUC is within City Limits, the
Planning Area, and Sphere of Influence, as defined by SB 1000. The City does not have
any Disadvantaged Unincorporated Communities, as defined by SB 244, with or
contiguous to the Sphere of Influence. Further discussion and analysis is in Section 4 of
this MSR.
present and Planned Capacity of Public Facilities and Adeguac� of Public Secvices
Including Infrastructure Needs or Oefjcjencjes
■ Law Enforcement
The City of Escalon provides adequate law enforcement services to meet the
needs of the existing population.
The City of Escalon has planned for the anticipated growth in population and
associated need for law enforcement capital improvements by incorporating
these needs into a Development Impact Fee Nexus Study prepared by David
Taussig & Associates dated December 16, 2016. The City will be able to pay for
the additional law enforcement operational needs through the expanded tax
base generated by new development. Capital costs for facilities and equipment
will be funded through development fees collected from these new
developments. The City's Police Department will continue to monitor these fees
to ensure that the fees collected are adequate to serve the expanded needs of
the City.
4
• fire Protection
The fire protection needs of the City are currently being met by the Escalon
Consolidated Fire Protection District (CFPD).
Escalon, the 2019 General Plan growth boundary, and the City's proposed Sphere
of Influence ore all within the service boundary of the Fire District therefore, the
Fire District will continue to serve the land within the City boundaries as well as the
land in the proposed SOI. As the City grows and the capital expenditures and
staffing needs increase, the City will need to work closely with the Escalon CFPD
to ensure that the Fire District is able to adequately service the additional
population generated by the annexation of additional land into the City.
Since the fire facility fee has not been reviewed or increased since the early 1990's ,
it is suggested that the Fire District commission a nexus study to determine the
appropriate fee with a built-in escalation rate for new development so that the
Fire District can adequately accommodate the projected growth.
• Water Supply
The City has an adequate water supply and provides adequate water service to
the residents of the City.
General Plan build out and associated expansion of the City water well system will
increase demands on the underlying groundwater system. However, this
increased demand will be satisfied through the use of groundwater as well as the
SSJID surface water acquired through the City's participation in the South San
Joaquin Irrigation District (SSJID) South County Water Supply Program. Two
independent water supplies in a conjunctive use program will provide
redundancy and reliability to the City's long-term water supply. The Water Master
Plan also sets a connection fee which offsets the costs of new development
through build out of the General Plan. The City has developed a schedule of
improvements and triggers for necessary improvements which will ensure that the
water systems grows in conjunction with the City's future expansion according to
the adopted General Plan. The City continues to use the adopted master Water
Plan as a blue print to guide necessary water improvements to keep pace with
increased water demand. Therefore, the City has an adequate supply of water
and water system to meet the increased demand through General Plan build out.
• Wastewater Collection
The City provides adequate wastewater services to meet the collection and
treatment needs of the existing population.
On-site sewer system improvements required by new development would be the
responsibility of developers and sub-dividers who must design, install and pay for
improvements the City Engineer determines to be necessary based on the Sewer
Master Plan. Major facilities would be financed on the basis of fees collected or
expected to be collected as port of the sewer connection fee established by the
Sewer Master Plan and adopted by the City Council.
The City received a Notice of Violation from the Central Valley Regional Water
5
Quality Control Board [CVRWQCB) on September 24, 2014 which detailed
violations with Waste Discharge Requirements jWDRs), which prescribes
requirements for the domestic and industrial wastewater treatment operation.
Since 2014, the City has addressed the Notice of Violation through a number of
temporary fixes. However, the Notice of Violation will not be removed until
permanent upgrades are made to the plant through the City's Modernization
Project. The City continues to work with the CVRWQCB to address the violations,
upgrade and modernize the Wastewater Treatment Plant. Further discussion
Wastewater Collection and
related to the Notice of Violation is in Section 5.5,
Treatment.
Demands for sewage disposal can be met with implementation of the Sewer
Master Plan which took into consideration the ultimate build out of the General
Plan. Necessary connection fees are being collected by the City to
accommodate the Sewer Master Plan objectives. The Sewer Master Plan outlines
the improvements needed and the phasing of the improvements depending on
where the growth occurs through the General Plan build out. The Master Plan will
be monitored and updated to ensure that the infrastructure and fees continue to
keep pace with the City's growth and inflation.
• Storm Water Drainage
The existing storm water drainage system is adequate for serving the needs of
Escalon's population.
Development will place increasing demand on the City's storm drainage facilities
and create a need to expand the capacity of the City's storm drainage facilities.
Individual developments will provide necessary improvements to their projects
based on the City's Storm Water Drainage Master Plan. A storm drainage fee
imposed on the new residential and nonresidential land uses will be used to fund
the expansion and improvement of the City's storm drainage facilities and thereby
meet the increased demand caused by these development types.
The Storm Drain Master Plan took into consideration the City's ultimate growth
boundaries when analyzing the storm water needs. The Master Plan also
established the cost to develop each of the storm drain basins needed to
accommodate ultimate build out of the General Plan. Based on these
calculations, the City adopted a new storm drain connection fee and has thus
planned for the eventual build out of the City General Plan boundary.
Financial Ability to Provide Services
Escalon receives funds for the provision of public services through development fees,
property taxes, and connection and usage fees. As land is annexed into the City from
the SOI, these fees will apply to new development. The City reviews the fee structure
every two years and indexes the fee on an annual basis to ensure that adequate funds
are collected to cover the provision of City services to existing, as well as new residents.
The Escalon CFPD is responsible for the fire protection services in the City of Escalon. As
the City grows and the capital expenditures and staffing needs increase, the City will
6
need to work closely with the Escalon CFPD to ensure that the Fire District is able to
adequately service the additional population generated by the annexation of additional
land into the City.
Since the fire facility fee has not been reviewed or increased since the early l 990's, it is
suggested that the Fire District commission a nexus study to determine the appropriate
fee with a built-in escalation rate for new development so that the Fire District can
adequately accommodate the projected growth. The Chief is currently putting together
a request to his board to increase the fee which, once adjusted, will adequately fund
the necessary expansion of the fire department due to new growth.
Status of, and Opportunities for, Shared Facilities
Escalon has multiple processes in place to assess whether levels of service provided are
adequate to accommodate new growth, including the City's General Plan, its annual
budgeting process. and master planning process for water supply and distribution,
wastewater systems, storm water systems. as well as law enforcement services. It is
through these processes that the City will continue to monitor and assess whether future
opportunities for shared facilities will improve levels of service in a cost-effective manner.
Accountability for Community Service Needs, Including Governmental Structure and
Operational Efficiencies
• Local Accountability and Governance
The City has established a good system of accountability which adequately
serves the residents of Escalon.
The City of Escalon is responsible for governance within its incorporated
boundaries. Actions of the City Council, including opportunities for public
involvement and public hearing, are regulated in accordance with the Brown
Act (California Government Code Section 54950 et seq.) other applicable
statues and regulations, and City procedures.
The residents of Escalon are offered a wide range of opportunities to oversee
the activities of elected, appointed, and paid representatives responsible for
the provision of public services to the community through elections, publicized
meetings, and hearings, as well as through the reports completed in
compliance with State and Federal reporting requirements.
• Government Structure Options
Escalon's government structure is adequate and meets the needs of the
residents.
Since Escalon is an incorporated City, the City Council will make the final
decisions concerning fee structures and the provisions of services. As discussed
in previous chapters, the City of Escalon and the Escalon CFPD should both
review their fee structures every two years and index the fees on an annual
basis, so they ensure the funds they are collecting are adequate to meet the
needs of a growing city. The City's General Plan also has goals. objectives,
7
policies. and actions to ensure that adequate services are provided in a cost
effective manner to accommodate new growth.
• _Evaluation of Management Efficiencies
The City will continue to use the budget and long-range planning processes to
ensure the ability to provide direct and adequate levels of service in a cost
effective manner within its service area.
8
1 INTRODUCTION
The Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000 (CKH Act)
requires the Local Agency Formation Commission. LAFCo. to update the Spheres of
Influence for all applicable jurisdictions in the County. A Sphere of Influence (SOI) is
defined by Government Code 56425 as " ... a plan for the probable physical boundary
and service area of a local agency or municipality ... " The Act further requires that a
Municipal Service Review (MSR) be conducted prior to or in conjunction with the update
of a Sphere of Influence. This document incorporates the Sphere of Influence Plan and
the MSR into one cohesive document for streamlined processing. This MSR will be used by
San Joaquin LAFCo to consider amendments to the Escalon SOI consistent with the 1994
General Plan as updated in 2019 and to re-align the 10-and 30-year growth horizons with
current growth plans.
The legislative authority for conducting Municipal Service Reviews is provided in the CKH
Act and the San Joaquin LAFCo MSR Policies dated December 14. 2012. State law
requires the MSR to make six written determinations. This document was set up to address
the six (6) determinations as well as the Sphere of Influence Plan and is organized as
follows:
l. Introduction.
2. Sphere of Influence Plan.
3. Growth and population projections for the affected area.
4. Location and Characteristics of any Disadvantaged Unincorporated
Communities within or Contiguous to the Sphere of Influence.
5. Present and planned capacity of public facilities and adequacy of public
services. including infrastructure needs or deficiencies.
6. Financial ability of agencies to provide services.
7. Status of. and opportunities for. shared facilities.
8. Accountability for community service needs, including governmental structure
and operational efficiencies.
9. References.
1.1 LAFCO AND THE SPHERE OF INFLUENCE (SOI)
The primary role of LAFCo is to implement the 2000 Cortese-Knox-Hertzberg Act consistent
with local conditions and circumstances (Government Code Section 56000 et seq.).
According to the 2000 Cortese-Knox-Hertzberg Act. the purpose of LAFCo is to:
• Promote orderly growth and urban development;
• Promote cooperative planning efforts among cities. the county, and special
districts to address concerns regarding land use and development standards,
premature conversion of agricultural and open space lands. efficient provisions
of services. and discouragement of urban sprawl;
• Serve as a master plan for future local government reorganization by providing
long-range guidelines for efficient provision of public services; and,
9
• Guide consideration of proposal and studies for changes of organization and
reorganization.
An SOI is defined as a "plan for the probable physical boundaries and service area of a
local agency, as determined by the Commission" (Government Code Section 56076). In
simple terms, an SOI is a planning boundary within which a City or district anticipates to
grow over time. The purpose of an SOI is to encourage "logical and orderly development
and coordination of local government agencies so as to advantageously provide for the
present and future needs of the county and its communities." SOi's serve a similar
function for LAFCo determinations as general plans do for cities and counties.
An MSR must be prepared and updated to establish, update, or confirm an existing SOI,
and the MSR must address the six determinations previously outlined. LAFCo is required to
prepare the MSR and adopt written determinations either prior to, or in conjunction with,
any action to establish or update an SOI. Adopted LAFCo policies emphasize the use of
existing plans, data, and information currently available for preparation of MSRs rather,
than requiring preparation of new service documents.
San Joaquin LAFCo's procedural guidelines adopted December 14, 2012, require
documentation through preparation of an MSR of the City's ability to meet the
requirements of the 2000 Cortese-Knox-Hertzberg Act. The Sphere Plan, along with this
updated MSR and the City's 2019 updated General Plan, provides the basis for
consideration of amendments to the City's existing SOI.
1.2 CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA}
The update to Escalon's MSR is not defined as a "Project" under CEQA; however, the
proposed amendment to the SOI is subject to CEQA. The City of Escalon intends to file a
Notice of Exemption pursuant to Section 15262 "Feasibility and Planning Studies" for the
proposed minor adjustments to the Cities SOI and growth horizons.
SPHERE OF INFLUENCE PLAN
1.3 SPHERE OF INFLUENCE
The City of Escalon adopted a comprehensive update to its General Plan on June 6,
2005. The General Plan received a technical update on December 2, 2019 and identifies
land to provide for potential growth for the next 50 years.
Exhibit 1-1 illustrates the current City limits and adopted Sphere of Influence boundary.
Exhibit 1-2 illustrates the City of Escalon's General Plan boundary, the proposed 2030
growth boundary, and the proposed 2050 growth boundary. The proposed growth
boundaries are consistent with the goals established with the adopted 2019 General Plan
Update.
The proposed Sphere of Influence is the land adjacent to the existing City limits and is
targeted for the future expansion and development of the City. This land is designated
for future development during the planning period of the General Plan but is currently
outside the existing City limits. The SOI proposed in the following SOI Plan Update squares
10
off the existing boundary where appropriate. As illustrated in the comparison of Exhibit 1-
1. Existing Sphere of Influence and Exhibit 1-2, Proposed Sphere of Influence, the
differences between the adopted SOI and the proposed SOI (moving clockwise from the
Escalon-Bellot a Road northeast) are:
• The inclusion of the land north of Miller Avenue, area northeast of the City;
• The removal of the land east of Cambell Avenue and south of State Route 120.
area east of the City;
• The inclusion of the land north of Jones Avenue and west of Ellis Road, area west
of the City;
• The inclusion of the land north of Clough Road, area west of the City;
• The inclusion of the land south of Ullrey Ave. easterly of Brennan Road in the
southwest corner of the City;
• The inclusion of land westerly of the intersection of SR 120 and Brennan Road.
west of the City; and,
• The inclusion of land between Sante Fe Railroad Grade and Arthur Road.
northwest of the City.
There are approximately 736 acres within the City's existing SOI. There are approximately
795 acres contained in the proposed Sphere of Influence. This represents an increase of
approximately 59 acres between the existing and proposed Sphere of Influence. The
proposed Sphere of Influence does not extend beyond Jones Road to the south. This is
in part due to existing Agricultural Easements south of Jones Road, particularly the
Dawson Farm Agricultural Easement that was deeded to the American Farmland Trust in
2002. Specifically, the Dawson Family granted a Conservation Easement to the American
Farmland Trust on September 17, 2002 (recorded in San Joaquin County Document
Number 2002160211) for two (2) properties south of Jones Road (APNs: 247-160-17 (49.36-
acres) and a portion of APN: 247-200-01 (20.0-acres)). Additionally, the City's Urban
Boundary Element of the City's General Plan includes Policies related to limiting urban
growth and converting agricultural lands prematurely (Policy #4).
The land within the proposed SOI was included because the land is contiguous to the
existing City limits, is in proximity to urban uses and in an area where urban services can
be extended. The City Council has selected key properties within the 1 O and 30 year
growth horizon which serve to promote the orderly growth objectives. Approval of the
proposed SOI will allow for the well-planned expansion of services, consistent with good
growth management practices as described in the City's General Plan and Master
Infrastructure Plans. The General Plan has been designed to accommodate an expected
population growth of 6,461 persons over the next 50 years. (See Table 3-1 and 3-2 for
population projections and Table 2-5 for projected acreage needs).
11
This page is intentionally left blank.
12
LEGEND
- 2015 Gro'Mh Boundary
CJ 2025 Sphere of Influence
\\
Exhibit 1-1 Existing Sphere of influence
13
D
Lot Lines
- 10 Year Growth Bo undary
3 Year Sphere of Influence
Cl �
Oty Limits
Influence
14
Area of Interest contains 21,309 acres outside the SOI which are not anticipated to
develop within the stated planning horizons and therefore, will not be analyzed in detail
as part of this Municipal Service Review.
The Area of Interest (AOI) contains approximately thirty-three (33) square miles outside
the Sphere of Influence (SOI). Exhibit 1-3 provides an illustration of the City's Existing Area
of Interest. This area is not intended to be for the purposes of future development by the
City of Escalon. The City's Growth Management Ordinance limits residential growth and
the proposed SOI delineates what may be developed for commercial or industrial
purposes. This Area of Interest has been approved by San Joaquin LAFCo and is
consistent with LAFCo's procedures, which are provided below.
• Actions of an Acting Agency (county) may impact directly or indirectly upon
the Concerned Agency.
• limits "other" City encroachment into the AOI.
• LAFCo notification of other agency proposals in the AOI.
LAFCo does encourage that agencies notify each other of any proposed action that
may impact the other and to formalize such agreements to that extent in Memorandums
of Understanding. However, such agreements work well as long as personnel are aware
of them. Personnel changeover is inevitable and when it occurs the knowledge of these
agreements dims and then can be lost and so the procedure may not be followed.
LAFCo approving this AOI adds another level of review that can trigger notification of
proposed agency actions.
Escalon is a community much larger than just the City limits. A large number of area
residents who live outside the City continually come into the City's Planning and Building
divisions for those types of questions, including all types of development/building permits,
for which we have to direct them to the offices of San Joaquin County. Another factor
that provides an exceptionally strong sense of community for the SE corner of the county
is the school district and associated schools. All residents of the proposed AOI attend
Escalon High School. There is only one high school within the City of Escalon, and it has
and does build a very strong sense of community.
The Area of Interest is vastly compatible with the other 'areas' and District Boundaries that
make up the Community of Escalon. The Escalon Fire District would share almost the
identical boundaries that would make up the AOL The Fire District encompasses 59+
square miles. The Escalon Unified School District encompasses 160+ square miles. The
Escalon Planning Area, as designated by San Joaquin County, encompasses 97+ square
miles. The Escalon Zip Code includes 79+ square miles.
The City of Escalon views the AOI as a buffer both for the preservation of agricultural land
and activities but also as a buffer against encroachment by outlying activities, interests,
organizations, and agencies. The City does not view the AOI as an area for future
expansion urban development and associated services. That is limited to just the Sphere
of Influence.
15
1.4 CALIFORNIA ENVIRONMENTAL QUALITY ACT
The MSR is an informational document to be used for future actions that LAFCo or the
City have not yet approved, adopted, or funded: it is considered exempt from the
California Environmental Quality Act [CEQA) pursuant to Section 15262 of the CEQA
Guidelines. A Notice of Exemption pursuant to CEQA will be prepared by LAFCo.
A Sphere of Influence is defined as a "plan for the probable physical boundaries and
service area of a local agency as determined by the Commission" (Government Code
Section 56076). As such, the SOI update, because it modifies the existing SOL is subject
to CEQA review and is not statutorily or categorically exempt from CEQA. The change
to the planning boundary and thus the Sphere of Influence, was incorporated into the
Escalon General Plan update adopted by the Escalon City Council on December 2, 2019.
The City has provided the needed CEQA analysis for the updated SOI through the
analysis and adoption of the original General Plan EIR and the updated General Plan
CEQA performed in 2019. The City has processed a Notice of Exemption for the 2019
General Plan update and this information is documented in the City Councils actions.
16
LEGEND
□
County Boundary
D
Escalon Proposed Area of Interest
□
y------'-,---,,+�-l--+--l--+-.J-11
Ripon Area of Interest
----'-
�......... -r-" --+---+- ---+�..,,_.___... C] Ripon Sphere of Influence
Exhibit 1-3 Existing Area of Interest
17
2 SPHERE OF INFLUENCE PLAN
This chapter analyzes the City's ability to serve existing and future residents within the
proposed SOI. While LAFCo encourages the participation and cooperation of the
subject agency, adopting the Sphere of Influence is a LAFCo responsibility, and the
Commission is the sole authority as to the sufficiency of the documentation and the plan's
consistency with law and LAFCo policy. In updating the SOI for Escalon. LAFCo must
consider and prepare a written statement of its determinations with respect to the
following four factors as stated in Section 56425 (e) of the Cortese-Knox-Hertzberg Act:
• The present and planned land uses in the area. including agricultural and open
space lands;
• The present and probable need for public facilities and services in the area;
• The present capacity of public facilities and adequacy of public services that the
agency provides or is authorized to provide; and
• The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
In order to update Escalon's SOI. the State requires LAFCo to conduct a review of the
municipal services provided in the City and proposed SOI. The standards. procedures.
and policies for service reviews are contained in San Joaquin LAFCo's policies and
procedures. The SOI must be consistent with the determinations of the municipal service
review. San Joaquin LAFCo requires the Sphere Plan to include maps and explanatory
text that describe the boundary of the service area and the City's sphere.
2.1 EXISTING AND PROJECTED POPULATION
The City of Escalon's growth rate has shown a consistent rate of growth between 0.79%
and 2.95% over the 60-year time period. illustrated in Table 2-1.
Table 2-1 Historic Population of Escalon
Compounded
Year Population
Annual Growth
1960 1,763 ---
1970 2,366 2.55%
1980 3,127 2.43%
1990 4,437 2.95%
2000 5,963 2.56%
2010 7,132 1.64%
2020 7,742 0.79%
Source: US Census data; JB Anderson Land Use Planning
18
It is the City's goal to maintain the slow and steady growth rate into the future. To ensure
that the growth is managed, the City established a Growth Management Ordinance
(GMO) in April 1978. Over the years, the ordinance has been modified and fine-tuned
as needed. The GMO caps the maximum number of building allocations that can be
distributed each year at the equivalent of 75 single-family residential units. An allocation
can be carried over into the next year, but the number of allocations issued, including
the rollover allocations, is set at a maximum of 100 per year. By maintaining a set number
of allocations issued each year and assuming an average of 2.89 persons per household
(allocation), the population of the City will maintain a slow and steady growth rate of less
than 1% as shown in Table 2-2.
Table 2-2 30 -Year Average Annual Population Projections
UOP UOP DU's
Estimated Estimated Authorized
UOP Number
Net Average Number of DU's Through the GMO
Estimated of
Year Change in Annual Dwelling Needed to Escalon Estimated
Population Dwelling
Population Projected Units Support Growth Population
Growth Units
Population Population Management
Growth Growth Ordinance
2020 7,740 2,664
2025 8,158 418 1.02% 2,823 159 375 3,039 8,783
2030 8,452 294 0.70% 2,912 89 375 3,414 9,866
2035 8,599 147 0.34% 2,962 50 375 3,789 10,950
2040 8,718 119 0.27% 3,006 44 375 4,164 12,034
2045 8,831 113 0.26% 3,046 40 375 4 ,5 3 9 13,118
2050 8,927 96 0.22% 3,089 4 3 375 4,914 14,201
Source: US Census data; University of Pacific, Center for Business & Policy Research, San Joaquin County Demographic and
Employment Forecasts dated September 10, 2020; and JB Anderson Land Use Planning. Average Household size is 2.89 persons per
household.
2.2 PRESENT AND PLANNED LAND USES
Escalon is known for its small-town charm and can be characterized as a low-rise
community (one or two-story buildings) dominated by low density, single-family housing
along with some multi-family housing, low intensity commercial and some industrial uses.
The City is bisected by State Route 120. an east-west transportation arterial, and by J6
(McHenry Avenue and Escalon/Bellota Avenue). a north-south transportation arterial,
and by the Burlington Northern Santa Fe (BNSF) Railroad (formerly Atchison Topeka and
Santa Fe Railroad), which runs in a northwest to southeast direction through the center
of town.
Undeveloped lands beyond the City limits to the north, south, east and west are primarily
in active agriculture production or open space.
The City of Escalon's General Plan contains goals, objectives and policies for growth,
development, and open space throughout the City. Exhibit 2-3 shows the Land Use
Diagram for the current City limits and Exhibit 2-4 shows the Land Use Diagram for the
area within the adopted and Proposed Sphere of Influence (SOI).
19
Table 2-3 illustrates the breakdown by land use and acres for vacant land are within the
City limits and includes an inventory of the lands within the proposed SOI 10-year and 30-
year growth horizons.
Table 2-3 General Plan land Uses by Planning Horizon
ACRES
Available
Proposed Proposed
vacant land Total
10 year 30 Year
Land Use within the Proposed
Growth Growth
Existing City SOI
Horizon Horizon
limits
Commercial 6.7 13.5 0.62 14.1
Industrial -Light and Heavy 202.2 65.6 129.4 195.0
Low Density Residential 16.2 236.2 236.6 472.8
Medium Density Residential 9.2 10.1 0 10.1
High Density Residential 4.6 16.3 0 20.9
Park/Open Space 0 52.2 34.9 87.1
Public Facilities 0 0 0 0
Agricultural 0 0 0 0
Source: Escalon Housing Element of December 2. 2019 by Denovo Planning Group, GP
Update of 2019 and Giuliani & Kull, Inc. Civil Engineers.
Based on the maximum household projections. the total number of dwelling units is
projected to increase from 2,664 in 2020 to maximum of 4,914 dwelling units by 2050 as
referenced in Table 2-4 below. As noted above, the San Joaquin Council of
Governments (SJCOG) approved the Final Regional Housing Needs Plan (RHNP) for the
1
6h Cycle planning period (2023 - 2031 ). For Escalon, the total number of RHNA is 367
units, including a total of 146 Lower Income (Below Market Rate (BMR)) and 221 Higher
&
Income (Moderate Above-Moderate Income). Planning for these units over the course
1
of the 6h Planning Period will be achieved through the City of Escalon Housing Element
Update.
The distribution of new housing units by density is projected to remain nearly the same as
the current distribution. This assumption is strongly affected by the General Plan and
zoning policies adopted by the City. The total acreage demand for housing units is
estimated on the basis of the current average density in each residential category as
shown in Table 2-4. Comparing the unit counts with the total acreage for each residential
land use category. the average densities are approximately 4.8 units per acre in the Low
Density category, 9 .6 units per acre in the Medium-Density category, 22.0 units per acre
in the High-Density residential land use category and 13.6 units per acre in the
List of Permitted
Commercial land use category. Pursuant to Chapter 17.11. Uses of the
Escalon Municipal Code (EMC). residential uses are permitted in the C-1 and C-2 Zoning
Districts. Specifically, single-family dwellings and two-family dwellings are permitted
above a commercial development unless the project is approved under the planned
development zoning district process. Multifamily residential is allowed as a permitted use
with a preliminary development plan. Again, these figures could change but they
20
provide the basis for the land demand estimates for residential uses as shown in Table 2-
4 and Table 2-5.
Table 2-4 Projected New Residential Dwelling Units
Total
land Use 2020 2025 2030 2035 2040 2045 2050 Possible
New DU's
Low Density Residential 225 225 225 225 225 225 1,350
Medium Density Residential 7 5 7 5 7 5 7 5 7 5 75 450
High Density Residential 38 38 38 38 38 38 225
Community Commercial (C-2) 38 38 38 38 38 38 225
Total New DU's 375 375 375 375 375 375 2,250
Cumulative 2664 3039 3414 3789 4164 4539 4914
Source: City of Escalon General Plan Update 2019.
Table 2-5 presented below demonstrates the number of acres of residential land
available within the City limits and the projected acres of land and possible dwelling units
in the suggested 10 and 30 year growth horizons.
Table 2-5 Evaluation of Projected Acreage and Possible Dwelling Units in the
Proposed SOI
Proposed 10-year Proposed 30-year
histing City limits
Growth Horizon Growth Horizon
Acres Projected Projected Projected
land Use Acres Acres
Available DU's DU's DU's
Low Density Residential 16.25 108 236.2 1,134 236.6 1,136
Medium Density Residential 9.17 109 10.1
97 0 0
High Density Residential 4.61 104 16.3 358
0 0
Community Commercial (C-2) 6.74 92 13.5 184 0.62 8
Possible DU's 413 1,773 1,144
Source: City of Escalon Housing Element of December 2, 2019 prepared by Denovo Planning Group and Escalon
General Plan Update 2019.
The City of Escalon General Plan, Objective A, Policy 2a suggest that the City needs to
assume a 30% vacancy factor ("flexibility factor") for residential designated lands. A
comparison of Table 2-4 and 2-5 demonstrates that the amount of land suggested in the
1 O and 30 year growth horizons is in keeping with stated General Plan Policy.
Infrastructure continues to be designed to accommodate the anticipated population.
2.3 PRESENT AND PROBABLE NEED FOR PUBLIC f ACILITIES AND SERVICES
LAFCo is responsible for determining if an agency is reasonably capable of providing
needed infrastructure and services to serve areas within its Sphere of Influence. LAFCo is
required to evaluate present and long-term infrastructure demands and resource
availability and to evaluate whether the resources and services are available at needed
21
service levels and that orderly maintenance and expansion of such resources and
services are made in line with increasing demands.
Escalon's existing public facilities and current level of service are adequate to meet the
needs of the existing population. Escalon will need to expand fire, law enforcement,
water, wastewater, and drainage facilities and services as the City grows. Future growth
and development within the proposed SOI will require continued improvements and
upgrades to infrastructure and services: however, the City has policies and procedures
and funding mechanisms in place that ensure the proper timing and adequate funding
for needed infrastructure and services. Development fees and connection fees will
address the capital cost of new development. Areas where growth is projected will be
sufficiently served by public facilities, and mechanisms are in place to ensure that
adequate facilities and services are provided as growth occurs. Chapter 5 of this
document provides the detail to support these statements.
22
LEGEND
D.cr.t1.mes
Dt.ct.�
EXil1t1n9 Land Uee:
..cw.�ccnstt)' Ras/dl:ICII
MK:ir.n-De.u· i:,· Re&l:e�,1
Htfi-0e1"1i-"I R:Gleetras
--:::srrrm�·
l '-'Ghl h��t1:I
HH,)' lr'.dUSll'.lll
-0��Ei;11cie
-l'Ltl.C Fa:Jtl>'
land Us
23
c:)LotU.,e, -Open 5c>oCz
____...... c:::I CIY UmllS .....jGt l)epa ,,,,,."'
'"t"'"""' Land use •
p...vvw-,,,l
24
Pu bi c �
IDw°"'"""
' - - Common:11 � Ughl - I'; - 1 Co Ho mmrcill ..,,. ctr.,n ng -11,Q M edlUm h Dersa D<N/ •• ty • _,. -.r., 1'; _ ,., 1 .
L":.10G-Bcundo,y
--vylnd...,,;al
PRESENT CAPACITY AND ADEQUACY OF PUBLIC SERVICES
2.4
As evidenced in this MSR Analysis, the City of Escalon currently provides adequate public
services. The Escalon Consolidated Fire Protection District (EFD) will be able to adequately
serve the projected growth of the City of Escalon, but the City and Fire District may have
to increase fees, assessments and/or taxes in the future to provide the same level of
service because costs and regulations will more than likely increase. However, the
expansion of the Sphere of Influence and potential annexation of additional land could
provide an improved financial position for the City by generating additional property
taxes and development fees.
The City will need to monitor their Development Impact Fee and connection fees on a
regular basis to ensure the funds collected continue to be adequate to cover the
expenses generated from future growth. The City of Escalon and the Escalon
Consolidated Fire Protection District will need to work together to ensure that the funding
needed by the Fire District is adequate to accommodate the additional growth within
the City limits for both capital expenditures and staffing needs will be met.
2.5 SOCIAL OR ECONOMIC COMMUNITIES OF INTEREST
The City of Escalon has a variety of social and economic communities of interest,
including numerous businesses, schools, churches, public sector facilities, and other
Community Service programs that serve residents. The existing social fabric of the City will
not be adversely affected by the proposed changes to the Sphere of Influence. Due to
the small increase in the proposed Sphere of Influence it is likely that the existing
communities of interest will grow with the added population. It is not likely that new
communities of interest will be added. The City will maintain its close knit community feel.
Escalon does not have any City or community immediately adjacent to its existing City
limits or proposed SOI. The City's closest neighbors are Modesto and Riverbank to the
south. Oakdale to the southeast and Ripon to the west. All these cities share economic
and social interests with Escalon due to their shopping and job opportunities. However,
due to their distance from the City limits, none of these cities would be adversely
impacted by the proposed changes to Escalon's SOI.
25
3 GROWTH AND POPULATION PROJECTIONS
This section identifies growth projections for Escalon and its SOI that need to be taken into
consideration when planning for the provision of services. A detailed discussion on
existing and future provision of municipal services to meet the future demand identified
in this section is included in Section 4.
The City has plans and policies in place to ensure that as demand increases, as allowed
by the General Plan adopted in 2019, adequate public services will be provided, while
the existing service levels are maintained. The City has updated the Water, Wastewater,
and Storm Drain Master Plans to take into consideration the potential future growth as
anticipated by the Escalon General Plan.
3.1 GROWTH PROJECTIONS
According to the US Census, there were 7,472 people living in Escalon at the time of the
2020 Census. This represents an annual growth rate of 3% between 1990 and 2000. Since
2010, the California State Department of Finance estimates that Escalon experienced a
steady rate of growth, with 7,501 residents estimated for January l, 2021. This reflects an
annual growth rate of 0.79% between 2010 and 2020. This is obviously a much slower
growth rate than anticipated by even the adopted Escalon Growth Management
Ordinance. Table 3-1 illustrates the population and household projections from 2025 to
2050. (Note: The numbers on Table 3.1 were generated in 2021 using projections
presented by the University of Pacific, Center for Business & Policy Research
Demographic and Employment Forecasts dated September l 0. 2020.}
Table 3.1 Population and Household Projections, 2025 To 2050
2025 2030 2035 2040 2045 2050
Total Population 8.158 8,452 8,599 8,718 8.831 8,927
Households 2.823 2,912 2.962 3,006 3,046 3,089
Average Household Size 2.89 2.89 2.89 2.89 2.89 2.89
Source: University of the Pacific, Center for Business & Policy Research. Son Joaquin County Demographic and
Employment Forecasts doted September 10. 2020.
It is the City's goal to maintain the slow and steady growth rate into the future. To ensure
that the growth is managed, the City established a Growth Management Ordinance
(GMO) in April 1978. Over the years. the ordinance has been modified and fine-tuned
as needed. The GMO caps the maximum number of building permits that can be
allocated each year at 75 single-family residential units. A building permit allocation can
be carried over into the next year however, the number of building permits issued
including the rollover allocations is set at a maximum of 100 per year. By maintaining a
set number of building permits issued each year and assuming 2.89 persons per dwelling
units, the City will continue to maintain a slow and steady growth rate of less than 1 % as
shown in Table 3.2.
26
This slow but steady increase in population can be traced back to the City's growth
ordinance. This ordinance was originally adopted in 1978. Over the years it hos been
refined and updated in order to keep pace with the City's needs. The overage annual
population growth rate between 2010 and 2020 was 0.79%
Table 3.2 Population Projections
Estimated New Compounded
Year
Pooulation Residents Growth
2025 8,158 418 1.02%
2030 8,452 294 0.70%
2035 8,599 147 0.34%
2040 8,718 119 0.27%
2045 8,831 113 0.26%
2050 8,927 96 0.22%
Source: University of the Pacific, Center for Business & Policy Research, San
Joaquin County Demographic and Employment Forecasts dated September JO.
2020; JB Anderson Land Use Planning.
Even though the City's growth ordinance does not limit commercial and industrial
growth, the commercial and industrial businesses rely upon serving the new residents and
will be affected by the limited growth of the residential areas.
3.2 GENERAL PLAN GROWTH POLICIES
The MSR must evaluate whether projections for future growth and population patterns
ore integrated into Escolon's planning functions. The Escalon General Plan does provide
the framework for future growth within Escalon and its SOI. The General Pion includes
goals. objectives. and policies for the provision of services to accommodate anticipated
growth. These goals, objectives and policies include the following:
• The City shall maintain a reliable water supply system that meets the fire
protection needs of the community. (Chapter 2.2, Objective A. Policy 2.
page 2-5)
• The City will coordinate with the Consolidated Escalon Fire Protection District
in the provision of fire protection services to ensure the maximum level of
protection for all residences, commercial establishments. and industries
within the planning area. (Chapter 2.2. Objective A. Policy 5, page 2-5)
• It is the policy of the City to require that water supply systems be related to
the size and configuration of land developments. Standards as set forth in
the current subdivision ordinance shall be maintained and improved. as
necessary. !Chapter 2.4, Objective A. Policy 2, page 2-6)
• The City shall ensure that there is at least a 10-yeor supply (80 acres) of zoned
and vacant commercial and industrial land inside the city limits at any one
time. The City will ensure that infrastructure is installed or programmed in the
27
Capital Improvement Program for a five-year supply of land so that such
property is "ready-to-go". (Chapter 4.0, Objective D, Policy 4.3. l, page 4-3)
• Consider annexations which are consistent with the extension of public
services and facilities and other City policies and plans. The City shall
maintain at least a 10-year supply of zoned land in the City for all residential
land use types and a minimum five-year supply of "ready to go" zoned land
served by infrastructure. Designate an adequate amount of residential land
in the General Plan for a 30-year supply of single-family and multi-family land
uses. (Chapter 7.2. Objective A, Policy 2, page 7-3)
• Plan and coordinate residential development in close proximity to planned
urban facilities and services such as schools, parks, sanitary sewer, water,
storm drainage. circulation network, transportation facilities and commercial
centers. (Chapter 7.2, Policy 5, page 7-4)
• Future growth in the City shall conform to the Growth Management
Ordinance of the City of Escalon. Residential building permits shall be limited
as provided by the City's Growth Management Ordinance in effect.
(Chapter 7.2. Policy 20, page 7-7)
• Update the water, wastewater, and storm drainage master plans, and any
other specific or master plans related to infrastructure development on a
periodic basis. (Chapter 7.5, Objective A. Policy l, page 7-1 OJ
• Annually monitor the need for law enforcement, fire and other emergency
services personnel as the City grows. (Chapter 7 .5, Objective A. Policy 2,
page 7-10)
• It is the policy of the City that new growth shall pay its own way. Fees shall
be established to pay for both needed facilities and incremental demands
on existing facilities. (Chapter 9.1, Objective A. page 9-2)
• A master plan for the development and funding of necessary services and
utilities (including but not limited to storm drainage, water, and sanitary
facilities) shall be developed and adopted. Funding can be through the
formation of an assessment district, entering into deferral agreements or
direct developer funding of improvements. Distribution of cost for
improvements shall be done in a fair and equitable manner. (Chapter 9.1,
Objective B, page 9-2)
• Developers shall prepare an infrastructure and public services assessment as
part of each annexation and/or development application to determine
infrastructure needs, feasibility, timing. and financing. (Chapter 9. l. Policy 2,
page 9-2)
• Require the extension and construction of infrastructure to proposed
developments according to adopted elements and master plans. The City
shall use reimbursement agreements or other financing techniques to
reimburse developments for any oversizing cost, which may be required.
(Chapter 9.1, Policy 4, page 9-2)
28
• New development shall demonstrate that adequate sewage capacity and
sewage treatment capacity exist prior to development or that conditions of
project approval will ensure adequate capacity and will be created as part
of the project prior to the issuance of building permits. Conditions may
include installation of necessary facilities or other methods acceptable to the
City. (Chapter 9 .1. Policy 13, page 9-3)
• Establish a Planning Area Boundary around the City consistent with San
Joaquin LAFCo's Guidelines. This area should represent a potential SO-year
growth boundary with an additional appropriate buffer and/or greenbelt
extending an additional one-quarter to one-half mile. This area should
include any "areas or communities of interest" that may affect the City.
(Chapter 10.2, Objective A, Policy 1, page 10-2)
• Establish Urban Development Boundaries for the logical, sequential
development of the community over the next 30 years. These boundaries
shall be established based on the following factors:
Adequate residential, commercial, and industrial capacity for the
o
planning period:
Inclusion of a 30% vacancy factor for residential land; that is, at least
o
30% additional land shall be provided than needed for each 10-
year ring;
o Inclusion of at least a 50% vacancy factor for non-residential land;
Adequacy of infrastructure including existing and planned
o
capacity of sewage system, treatment plant, water system, schools,
roadways, and other urban services and facilities;
o LAFCo's guidelines for Planning Areas and Sphere's of Influence,
including the following factors:
• Logical areas for the extension of water transmission
mains;
• Ability to provide ample sewerage facilities;
• Ability to provide adequate police and fire protection;
• Ability to provide waste disposal;
• Ability to provide parks and recreation;
• Storm drainage service areas;
• Existing school, postal and juridical districts and other
special districts, which give municipal type services;
• Compatible street circulation;
• Geographic, economic and social relationships; and,
• Needed community green belts;
• Community growth priorities. (Chapter 10.2, Objective A,
Policy 2, page 10-2 through 10-3)
29
3.3 DETERMINATIONS
The General Plan. initially approved in 2005, estimated the population in Escalon would
reach approximately 8,825 by 2015 and 11,950 by the year 2025. Actual population
growth as of 2021 has been slower than anticipated based on a number of factors
including the recession of 2008 and the slow rebound of the local real estate economy.
The State Department of Finance estimates the population in Escalon as of January 1,
2020 to be 7.740.
The 2019 General Plan Update along with the stated Growth Management Ordinance
provides the framework for future growth within the City and its Sphere of Influence. To
that end, the General Plan includes a policy that states the City shall conform to the
Growth Management Ordinance. By following the adopted growth management
ordinance. the City will maintain an average annual absorption rate over the life of the
General Plan of no more than 2.5%.
Escalon will continue to review future growth and population patterns on a regular basis
and monitor growth within its SOI.
30
4 LOCATION AND CHARACTERISTICS OF ANY DISADVANTAGED
UNINCORPORATED COMMUNITIES WITHIN OR CONTIGUOUS TO THE
SPHERE OF INFLUENCE
SB 244 requires the identification and description of all "disadvantaged unincorporated
communities" (DUC's) located within or contiguous to the existing Sphere of Influence of
cities and special districts that provide fire protection, sewer, and/or water services. The
identified disadvantaged unincorporated communities are required to be addressed by
LAFCo when:
• Considering a City Annexation proposal involving 10 acres or more with an
existing disadvantaged unincorporated community contiguous to the proposed
area; and
• Approving Sphere of Influence and municipal service review determinations
associated with the updated or established Sphere of Influence for local
agencies subject to SB 244 requirements.
SB 244 also added Section 65302. l O to the Government Code to define the terms used
in the legislation as they relate to cities and counties. The key terms are defined as follows:
• "Community" means an inhabited area within a city or county that is comprised
of no less than 1O dwellings adjacent to or in close proximity to one another.
• "Disadvantaged unincorporated community" means a fringe, island, or legacy
community in which the median household income is 80 percent or less than the
statewide median household income.
• "Unincorporated fringe community" means any inhabited and unincorporated
territory that is within a city's sphere of influence.
• "Unincorporated island community" means any inhabited and unincorporated
territory that is surrounded or substantially surrounded by one or more cities or by
one or more cities and a county boundary or the Pacific Ocean.
• "Unincorporated legacy community" means a geographically isolated
community that is inhabited and has existed for at least 50 years.
According to the City of Escalon Environmental Justice White Paper, prepared by
DeNovo Planning Group in 2019 in preparation of the general Plan Update, Census Tract
No. 49.01 and Tract No. 49.02 are considered a Disadvantaged Communities, as defined
by SB 1000 which is "an area identified by the California Environmental Protection Agency
(CalEP A) pursuant to Section 39711 of the Health and Safety Code or an area that is a
low-income area that is disproportionately affected by environmental pollution and
other hazards that can lead to negative health effects, exposure, or environmental
degradation.
Census Tract No. 49.01 is primarily within City Limits though includes some of the City's
Sphere of Influence and Census Tract No. 49.02 is primarily located within the City's
Sphere of Influence and other unincorporated areas in the County. Exhibit 4-1 below
illustrates the boundary of Census Tract No. 49.01 and 49.02 and the proposed Sphere of
Influence.
31
Escalon,CA Census Tracts
1·
1
1
CENSUS TRACT 49.02
11
r:
City of Escalon
,,
,..,
''CENSUS TRACT 49.01
.I CENSUS TRACT 49.02
,,
'
'
Exhibit 4.1 - Boundary of Census Tract No. 49.01 and 49.02
32
Although the Escalon Environmental Justice White Paper identified the two (2) Census
Tracts as Disadvantaged Communities, it does not specifically include household income
pursuant to SB 244 to analyze whether the areas within the Sphere of Influence are
considered DUCs.
SB 244 outlines the general characteristics of DUCs but does not provide guidance on
how to identify them. The Governor's Office of Planning and Research (OPR) published
a technical advisory memorandum in February 2013 and recommends data sources for
identifying the income status of communities and mapping sources for identifying
"communities" as defined by SB 244. It also referenced methodologies prepared by
PolicyLink in collaboration with California Rural Legal Assistance in 2013. Based on these
two (2) sources of information. the City relied on the American Community Survey and
the 2000 Census for income data. The City reviewed the 2010 and 2020 Census but the
2010 and 2020 Census did not include income data.
The American Community Survey for 2020 and 2019 and the 2000 Census were used to
identify the Household Median Income for Census Tracts No. 49.01 and 49 .02. The Median
Household Income was then compared to the Statewide Median Household Income as
a percentage. As shown in the Table below, the Median Household Income for Census
Tract No. 49.01 and No. 49 .02 was 80.84% and 82.61% , respectively.
Table 4-1 Household Median Income -American Community Survey
(2019 and 2020)
Median Household Income Percentage to Statewide
Median Household Income
Census Tract 49 .01 $63 595 80.84%
Census Tract 49.02 $64 994 82.61 %
-
Statewide $78 672
Source:
U.S. Census Bureau, 2016-2020 American Communitt Survet 5-Year Estimates, Table
Sl901
U.S. Census Bureau, 2015-2019 American Communitt Survet 5-Year Estimates, Table
A 1901
As stated above, Policylink, in collaboration with the California Rural Legal Assistance
developed a report and methodology for identifying Disadvantaged Unincorporated
Communities. as defined by SB 244. The project used Geographic Information Systems
(GIS) to identify unincorporated communities in the eight-county San Joaquin Valley
region. The project focused on identifying places that are closely settled with a large
number of homes. rather than spread out rural communities. The report also relied on
U.S. Census data from 2000 by Census Tract to identify places of interest. While dated,
the 2000 census provided a more accurate depiction of income levels at the block group
level than the American Community Survey.
As shown in Table 4-2 below. the median household income of the state of California was
$47.493, so any census block group with a median household income of less than $37,994
and meets the definition of "Community" would be considered a DUC.
33
Tobie 4-2 below shows the Median Household Income compared to Census Tract No.
49.01 and No. 49.02.
Table 4-2 Household Median Income by Census Tract - U.S. Census (2000)
Median Household Income Percentage to Statewide
Median Household Income
.$50 436
Census Tract 49.01 L 106.20%
96.65%
Census Tract 49.02 $45 901
-
_$47 493
Statewide
Source:
U.S. Census Bureau, 2000 Census, Summarv File 4, Table PCT089, Median Household
Income in 1999 /Dollars)
Census Tract 49.01 has a total of three (3) Census Block Groups: Group 1, Group 2, and
Group 3. Census Tract 49.02 has a total of three (3) Census Block Groups: Group 1, Group
2, and Group 3. The City's proposed Sphere of Influence is located within a port of each
Census Block Group. The Table below shows the Median Household Income compared
to each Census Block Group.
Table 4-3 Household Median Income by Census Block Group - U.S. Census (2000)
Median Household Income Percentage to Statewide
Median Household Income
Census Tract 49.01
Block Group 1 $48,125 101.33%
Block Group 2 $53,107 111.82%
Block Group 3 $41, 111 86.56%
Census Tract 49.02
Block Grouo 1 $52,727 111.02%
Block Grouo 2 $50,272 105.85%
Block Grouo 3 $42,095 88.63%
-
$47,493
Statewide
Source:
U.S. Census, 2000 Census, Summary File 3, Table P053, Median Household Income in
1999 (Dollars!.
As shown above, the Median Household Income exceeds eighty percent (80%) of the
Statewide Median Household Income at the Census Block Group level. In addition to the
information above, Policylink did not identify any DUCs with the City of Escalon or within
the proposed Sphere of Influence.
4.3 DETERMINATIONS
As shown in the analysis above, the City does not have any Disadvantaged
Unincorporated Communities within or contiguous to the Sphere of Influence.
34
5 PRESENT AND PLANNED CAPACITY OF PUBLIC FACILITIES AND
ADEQUACY OF PUBLIC SERVICES, INCLUDING INFRASTRUCTURE NEEDS
OR DEFICIENCIES
The purpose of this section is to evaluate the infrastructure needs and deficiencies for
services provided by the City, especially as they relate to current and future users.
This section of the MSR will evaluate the following public services and infrastructure
systems:
• Law Enforcement
• Fire Protection
• Water Supply and Treatment
• Wastewater Collection and Treatment
• Storm Water Drainage
In order to approve a change to the SOI and annexation of land into the City, LAFCo
must determine that the necessary infrastructure and public services exist to support the
new uses at comparable service levels. The information presented within this section
supports the City's requested SOI boundary.
5.1 LAW ENFORCEMENT
The Escalon Police department was first formed as the Escalon Police District in
1939. When the City was incorporated in 1957, the "police district" was dissolved and the
Escalon Police Department was formed.
The Escalon Police Department provides around the clock police services for the City of
Escalon which encompasses an approximate area of 2.5 square miles. The Escalon Police
Department is located at 2040 McHenry Avenue in Escalon. The department offers 24-
hour police service and is open to the public Monday through Friday from 0800 (8:00 am)
to 1700 (5:00 pm) unless otherwise posted. Dispatching is handled by the office during
business hours. After hours, weekends and holidays, dispatching is handled by the Ripon
Police Department under contract.
The Escalon Police Department has a staff of 12 full-time sworn officers, 7 part-time sworn
reserve officers and two (2) support staff. The breakdown of the full-time officers is as
follows: one (1) Chief, two (2) sergeants, and nine (9) full-time sworn officers. Escalon's
Police Department's support personnel includes, a Police Manager, a Code Enforcement
Officer and four (4) part-time Animal Services Officer's. Escalon Police Officers are also
considered First Responders. They are trained in CPR and First Aid.
All officers must attend a Police Officers Standards and Training (POST) approved police
officer course and must be hired within three (3) years of completing that course. Once
they are hired, the new officers are placed with a Field Training Officer for 12-16 weeks.
The officers receive a minimum of 24 hours of additional training every two (2) years per
POST standards. The officers are trained to handle all types of calls. The City of Escalon
35
does offer specialized training in Accident Investigation, Gangs, Drugs, High-Tech Crime,
and Identity Theft.
The Department has a Senior Volunteer program with three (3) participants. Citizen
Volunteers give service by helping with vacation checks, parade assistance and wellness
checks. There is an explorer program for teenagers, and it currently has eight (8)
participants.
The average response time is three (3) minutes or less for priority calls (life threatening
situations) and seven (7) minutes or less for non-priority calls.
As it relates to Police Dispatch Services. the City has maintained a partnership with the
City of Ripon since 2001 for services (Original agreement was executed on September 4,
2001 }. On June 7, 2011, the City entered into an Agreement with the City of Ripon to
provide police dispatch services on a 24 hour / 7 days a week basis. An amendment to
the Agreement was approved by City Council in 2014 to address annual increase
adjustments and add language to identify that in the event of an outage, Ripon will
provide staffing as necessary to assist Escalon. On August 1, 2022, the City Council
adopted a new contract with the City of Ripon to provide police dispatch services. The
term of the contract is ten ( 10) years, expiring on June 30. 2032.
The Escalon Police Department defines offenses for statistical purposes using the FBl's Part
1 Crime Categories. Crimes are classified as Violent Crimes or Property Crimes. In 2019,
137 Part 1 violent offenses were reported, which include homicide, rape, burglary,
larceny and simple assaults. Part 1 property crimes for 2019 numbered 14 0. In 2020. 46
Part 1 violent offenses and 136 Part 1 property crimes were reported.
Law enforcement in the unincorporated area is the responsibility of the San Joaquin
County Sheriff Department. The Sheriff Department maintains a beat that includes the
Escalon area. This beat is designated as District 7 and includes Manteca, Lathrop, Ripon,
and Farmington. Usually. one or two officers are on duty for this beat. The Sheriff
Department has law enforcement power within incorporated cities and outside
corporate limits. Coroner's service is provided throughout the county by the Sheriff
Department.
The California Highway Patrol (CHP) handles all traffic-related incidents on California
State Route 12 0 and in the unincorporated county area. This includes issuing traffic
citations and investigating vehicle accidents and auto theft.
The Police Department receives funding from three (3) sources: the City's General Fund,
grants, and development impact fees.
The City updated their Development Impact Fee Nexus study on December 16. 2016. No
existing deficiencies were noted in the study. The study provides the nexus to show that
the impact fee meets the AB 1600 nexus requirements. The fees collected can only be
used to fund police-related capital costs attributable to the impact of new development.
The study set the standard of 1 .4 sworn officers per 1. 000 residents based on the ratio of
sworn officers versus the City's population at the time of the study.
36
Law Enforcement Analysis
As the City grows, increased population and new commercial and industrial
development will increase the need for police service. Police service requirements are
also influenced by the demands for traffic control and traffic accident services. Based
on the ratio of 1 .4 sworn officers per 1,000 residents, Escalon would need a total of 13
sworn officers in 2030 and 1 7 sworn officers in 2050.
The City will be able to pay for the additional law enforcement operational needs
through the expanded tax base generated by new development. Capital costs for
facilities and equipment will be funded through development fees collected from these
new developments. The City's Police and Public Works Departments will continue to
monitor these fees to ensure that the fees collected are adequate to serve the
expanded needs of the City.
FIRE PROTECTION
5.2
Fire protection and emergency medical services are provided by the Escalon
Consolidated Fire Protection District (EFD). The EFD does not have a contract with the
City to provide these services however the City is within their service boundary. Exhibit 4-
1 illustrates the Escalon Consolidated Fire Protection District's boundaries.
The Escalon Consolidated Fire Protection District, formed in 1912, provides fire suppression
and rescue operations around the clock to a district that covers 65 square miles of
primarily agricultural land. The district includes the City of Escalon and is located in the
southeast corner of San Joaquin County in Northern California. The service boundaries
are Dodds Road to the north, the Stanislaus River to the south, Victory Road to the east
and Carrolton Road to the west.
The EFD's main station and offices ore located at 1749 Coley Avenue in the City of
Escalon. Station 2, completed in January 2002, is located on the northern edge of the
district on Highway 120 (17950 S. Van Allen Road). This site was chosen in order to
maintain a maximum 5- mile limit from either of the stations to any location in the district.
At the present time all operations are conducted from the district's main station at 17 49
Coley Avenue in downtown Escalon.
When fully staffed the department consists of a Fire Chief, three (3) Battalion Chiefs, and
three (3) Firefighter Engineers. Coverage is based on a three (3) Platoon Shift. The
firefighter's schedule has been adjusted so the City is adequately covered while they
seek the additional firefighters. Support personnel consist of one ( 1) part time
Administrative Assistant. These personnel are assisted by ten I 10) reserve officers and six
{ 6) volunteers.
37
LEGEND
Exhibit 5• 1 Escalon Fire Protection District Boundary
38
The Fire District responds to all hazardous materials incidents as first responders. District
firefighters are trained at the First Responder Operational level.
EMERGENCY MEDICAL SERVICES
Emergency medical services are provided 24 hours a day by highly trained Firefighter
EMTs. Each firefighter is trained as an emergency medical technician and provides basic
medical treatment. The Escalon Fire District responds to over 1,000 EMS calls each
year. The District works closely with the Escalon Community Ambulance and other
ambulance providers in the area to serve the public with an effective level of service.
ORGANIZATIONAL INFORMATION ON THE DISTRICT
The original Fire District was organized by action of the Board of Supervisors on May 18,
1920, following a petition filed by Grant Higgins, et al for the appointment of a Board of
Fire Commissioners for the town or village of Escalon. More than fifty (50) people signed
the petition.
On September 10, 1957, the Fire District was reorganized by the Board of Supervisors
following discovery that the Escalon Fire District may have not been legally formed due
to the omission of certain procedures by the Board of Supervisors in the 1920 action. The
legal name of the EFD became the Escalon Fire Protection Department; however, the
shorter name persisted.
The EFD was reorganized under the 1961 Fire District Act on July 27, 1964.
On August 20, 1982, the Escalon Fire Protection District consolidated with the Escalon
Rural County Fire Protection District under provisions of the District Reorganization Act
(Government Code Section 56261.1) following action by the Board of Supervisors on July
20, 1982. The legal title of the consolidated district was established as Escalon
Consolidated Fire Protection District.
The Escalon CFPD is governed by a Board of Directors comprised of five (5) members
elected by the residents of the EFD to a four (4) year term. The Board of Directors
meetings are held on the second Thursday of the month at 7:00 PM. These meetings are
open to the public and are held at Escalon Fire Station 1-1.
The EFD has a difficult time in retaining qualified firefighters. Many of the firefighters are
lured away from the District by surrounding jurisdictions that can pay higher wages and
more fringe benefits. The District struggles to balance pay increases with the need for
additional personnel.
Between January of 2019 and December 2019 there were 1,342 calls for assistance. The
average reflux time (time from dispatch to on scene) for calls within the City limits is 5
minutes 32 seconds. Reflux time to rural areas is an average of 9 minutes 50 seconds. The
District's 90 percentile "turnout time" and "travel time" in 2009 was 2:25 minutes turnout
time and 7:25 minutes response time. These times were below the average 90 percentile
time for all combination rural fire districts at 2: 18 minutes turnout time and 7: 13 minutes
travel time. (Source: San Joaquin LAFCo Final Municipal Service Review for Rural Fire
39
Districts, October 21, 2011 ). These response times continue to be accurate as of
September, 2021 per email correspondence with the Escalon Fire District Chief Rick Mello
(email correspondence on September 13, 2021 ).
The Insurance Services Office (ISO) currently classifies the area in the City as a Class 4 and
the rural area as a Class 8b.
There are 281 fire hydrants in the district with an average of 55-62psi or 2, 100-2,200 gallons
per minute. The City currently has an adequate water supply and pressure to meet the
emergency needs of the Fire District.
EQUIPMENT
The District currently has the five (5) Engines of varying types, one (1 ) rescue vehicles and
two (2) water tenders for fire protection and emergency response equipment.
While the Escalon FD provides primary fire protection to their district, they also have a
mutual aid agreement with the surrounding fire protection service providers including
Ripon Fire District, Salida Fire District, Modesto Fire Department, Stanislaus Consolidated
Fire District and Farmington Fire District. As a result, if Escalon FD is unavailable to answer
a call in Escalon, a neighboring fire department will respond to the call if they are
available.
The Escalon FD receives funding from a variety of sources. The breakdown of funding for
the 2021-2022 fiscal year (projected) is as follows:
• 98% property taxes
• 0.7 5% fire facility fees
• 1.25% services fees/misc.
Escalon FD receives a Fire Facility Fee of $0.16 cents per square foot on all buildings built
within the District. The fee can be used to build and equip the fire stations (i.e. capital
expenditures). These funds cannot be used for operating expenses such as staffing or
additional firefighters. The Fire District also has an override tax of $0.05 cents per square
foot on buildings within the district that is added to the property tax bill. This money is
used to hire additional full-time personnel.
Fire Protection Analysis
Continued growth within the SOI will increase the overall demand on fire protection
services in the City due to the increase in development. All the land within the SOI is also
within the Fire District boundary so no expansion of service area is necessary to
accommodate the expansion of the City. Growth in accordance with build out of the
SOI is expected to generate the typical range of service calls, including structure fires,
auto fires, electrical fires, and others. New fire facilities, vehicles, equipment, and
personnel will be required to maintain adequate response times to serve future growth.
40
Therefore. the Fire District's costs to maintain equipment and facilities and to train and
equip personnel will also increase. Additional facilities. personnel, equipment. and
materials costs will be offset through the increased revenue and fees generated by the
expanded property tax base, the Fire Facility Fee and the override tax. However. the Fire
Facility fees may not be adequate to meet the projected needs in the future. The Fire
Facility fee has not been reviewed or increased since the early 1990's. It is suggested that
the Fire District commission a nexus study to determine the appropriate fee for new
development with escalation rate so that the Fire District can ensure their ability to
adequately accommodate the projected growth. If the nexus study or a subsequent
fee adjustment is unsuccessful, the City will explore other permissible funding mechanisms
to provide adequate fire service to residents of the City of Escalon.
FIRE FACILITY FEE
The Escalon FD is a standalone district with no ties to the City other than providing fire
protection services to the residents and businesses. The District is responsible for 100% of
the costs to run the District. The City of Escalon collects the $0.16 per square foot Fire
Facility Fee for the District when a building permit is pulled. This remains unchanged since
the adoption of the Escalon MSR of 2011.
The fire protection needs of the City are currently being met by the Escalon FD. However.
as the City grows and the capital expenditures and staffing needs increase. the City will
need to work closely with the Escalon FD to ensure that the fire district is able to
adequately service the additional population generated by the annexation of additional
land into the City. This may mean that the City establishes a contract with the Fire District
for the required level of services needed by the City or the City and District work together
to implement a public safety tax. Coordination with the Escalon FD related to the Fire
Protection Facilities Improvement Fee is detailed in Chapter 3.22 of the Escalon Municipal
Code. The City will continue to work with the Escalon FD to ensure that fire protection
services are being met for the existing City Limit and future annexations.
TAX REVENUE
Escalon receives revenue from specific taxes collected that assist with providing public
services to new growth and development. The City currently collects the following taxes:
• Property Tax;
• Soles and Use Tax;
• Measure K Soles Tax for Street and Road Improvements;
• Gas Tax;
• Transient Occupancy Tax; and,
• Park Development Tax.
In Fiscal Year 2019-2020, these taxes contributed $3,940,000.00 to the City's total revenue.
5.3 DETERMINATION
Escalon receives funds for the prov1s1on of public services and facilities through
development fees. property taxes and connection and usage fees.
41
As land is annexed into the City from the SOI, these fees will apply. The City reviews these
fee structures every two years and indexes the fee on an annual basis to ensure that
adequate funds are collected to cover the provision of City services to existing as well as
new residents.
The Escalon FD is responsible for the fire protection services in the City of Escalon. As the
City grows and the capital expenditures and staffing needs increase, the City will need
to work closely with the Escalon FD to ensure that the fire district is able to adequately
service the additional population generated by the annexation of additional land into
the City. This may mean that the City establishes a contract with the Fire District for the
required level of services needed by the City or the City and District work together to
implement a fire mitigation fee or a public safety tax.
Since the fire facility fee has not been reviewed or increased since the early 1990's it is
suggested that the Fire District commission a nexus study to determine the appropriate
fee with a built in escalation rate for new development so that the fire district can
adequately accommodate the projected growth. The Chief is currently putting together
a request to his board to increase the fee which once adjusted will adequately fund the
necessary expansion of the fire department due to new growth.
5.4 WATER SUPPLY
Historically, water supply within the City has been from groundwater wells. Water service
was initially provided by the Escalon Water Company, which· was a private company
established in the early 1900's. In the late 1960's, the City took over, from a developer,
the operation of a well and distribution system serving a small residential subdivision. In
the early 1980's, the City purchased the Escalon Water Company and took over the
operation of the entire water system. Water supply for domestic service and fire flow is
currently supplied from three (3) active wells which provide day-to-day domestic water
and fire flow supply. One additional well is used for standby and only operates in
emergency conditions. All water quality testing is kept up to date. There is one 500,000-
gallon storage tank located at the Well 1 site.
Well 1 has been equipped with two (2) granular activated carbon (GAC) contactors that
remove Dibromochloropropane (DBCP). Each vessel is rated for 700 gpm of capacity.
The treated water from the contactors enters the 0.5-million-gallon storage tank and is
then pumped into the system through the booster pump station. Eventually, this water will
be pumped directly into the system, bypassing the tank. No other treatment is necessary
throughout the system, although the City adds chlorine as a disinfectant as a
preventative measure, which is considered to be good practice.
The existing distribution system consists of approximately 33 miles of piping. Pipeline
diameters range from 3 to 1 6 inches. The original system was built with small diameter
steel pipes, which was inadequate to convey flows at adequate pressures. Due to the
dilapidated condition of the system, the City applied for and was awarded a State loan
and federal grant in 1983. To date, almost all of the old pipelines have been replaced,
and as a result, the distribution system is in excellent condition.
42
The system pressure is maintained automatically with a supervisory control and data
acquisition system (SCAD A). Operators enter the desired system pressure and configure
the wells in a lead/lag configuration. If the well set in the primary position cannot maintain
the system pressure, the second well in the series will start. The existing control system
works well.
The City's future supply will continue to utilize groundwater and be augmented by
surface water from the South San Joaquin Irrigation District (SSJID) South County Water
Supply Project. Two independent water supplies in a conjunctive use program will provide
redundancy and reliability to the City's long-term water supply.
The City does not anticipate that all of the land will be developed within a particular
General Plan planning boundary within the time frame indicated; however, for projecting
water demands and future distribution and transmission facilities, full build out was
assumed to prevent under sizing the facilities resulting in the need to return and upsize or
add major infrastructure in the future. Table 5-1 illustrates the water demand through
build out of the proposed Sphere of Influence.
Table 5-1 Projected Water Demands
Annual
Average Maximum Peak
PLANNING BOUNDARY MGD DavMGD Hour/Mgol/d
Existing Development
1.4 3.2
w/in City Limits 4.6
2025 Planning Area 4.4 10.6 15.2
2035 Planning Area 5.7 13.7 19.6
Source: City of Escalon Wafer Mosler Plan, Table 2-3, ECO:LOGIC Engineering. 2007
�ROUNDWATER WELLS
Based on the Water System Evaluation Addendum prepare by Blackwater Consulting
April 2016, the City has established 4 priority water system improvements:
• Improvement 1 - Destroy Existing Well No. 1, Construct New Well, and Remove
GAC Filters
• Improvement 2(a) - Increase Well Capacity of Existing Well No. 3A
• Improvement 3 -Increase the Motor Horsepower of Well Pump No. 9
• Improvement 4 - Replace Existing Well Site No. 1 Booster Pumps and Motors with
New Booster Pumps and Motors with Variable Frequency Drives
The construction of the future wells should be based on the level of development and
built as the system demands increase along with development.
Table 5-2 illustrates the average daily water demands of the existing wells through 2020.
43
Table 5-2 Average Daily Water Useage
Mox Doily
Average Doily
Water
YEAR Water Useoge
Demond
(MGD)
{MGD)
2008 l.68 2.56
2009 l.59 2.63
2010 1.43 2.60
2011 1.47 2.45
2012 1.60 2.77
2013 1.69 2.63
2014 1.47 2.49
2015 1.19 1.65
2016 1.17 1.87
2017 1.29 2.19
2018 1.30 2.11
2019 1.32 2.20
2020 1.42 2.27
Source: City of Escalon Water System Evaluation,
Blackwater Consulting Engineers, February 2016: Giuliani
& Kull, Inc. 2021.
Table 5-3 illustrates the capacity of the existing wells in the City of Escalon. Additional
water will be provided by additional wells and the South San Joaquin Irrigation District
Surface Water Project as described below.
Table 5-3 Summary of Well Capacity
Cooocltv
Well# Status GPM MGD
1 Inactive 0 0.0
3A Acfive 1.100 1.6
9 Active 800 1.15
10 Active 1,300 1.9
Total Active Pumoina Cooocitv 3,200 4.65
Source: City of Escalon Water System Evaluation,
Blackwater Consulting Engineers, February 2016
WATER QUALITY
The City routinely monitors the water that is treated and served to customers to ensure
that water delivered to customers meet water quality standards. There are two (2)
general types of drinking water standards:
• Primary Maximum Contaminant levels (MCls) are health protective standards
and ore established using a very conservative risk-based approach for each
constituent that tokes into potential health effects, detectability and treatability,
44
and costs of treatment. Public water systems may not serve water that exceeds
Primary MC Ls for any constituent.
• Secondary MCLs are based on the qualities of the water such as taste, odor, and
certain mineral content, and are considered limits for constituents that may affect
consumer acceptance of the water.
The results of this testing are reported to the State Water Resources Control Board
(SWRCB), Division of Drinking Water (DOW) following each test and are summarized in
Consumer Confidence Reports, which are provided to customers by mail and made
available on the City's website at:
https://www.cityofescalon.org/qovernment/departments/public works/water departm
ent.
As shown in the latest Consumer Confidence Report (January 2022), the City complies
with all State and federal drinking water standards, and do not exceed MCL standards.
The Report shows detection of contaminants with a primary drinking water standard, such
as Arsenic, Fluoride, Chlorine and Nitrate but the levels detected do not exceed MCL
standards and are attributable to a number of factors, such as erosion from natural
deposits, discharge from fertilizer and aluminum discharges. drinking water disinfectant.
and leaching from septic tonk and sewage erosion.
GROUNDWATER SUPPLY
The City overlies the Eastern Son Joaquin Groundwater Subbosin (Subbosin). The
Subbosin is one of twenty-one (21) basins and subbosins identified by the California
Deportment of Water Resources (DWR) as being in in a state of critical overdraft. The
Eastern Son Joaquin Groundwater Authority (ESJGWA) was formed in 2017 in response to
the Stoinoble Groundwater Management Act (SGMA) which was enacted in 2014. The
ESJGWA prepared the Groundwater Sustainability Pion (GSP) to achieve groundwater
sustainability in the Subbosin by 2040 and was adopted by the ESJGWA in November
2019 and was recently revised in June 2022. The GSP outlines the need to reduce
overdraft conditions and hos identified twenty-three (23) projects for potential
development that either replace groundwater use (offset) or supplement groundwater
supplies (recharge) to meet current and future water demands. The GSP con be viewed
on the Eastern Son Joaquin Groundwater Authority website:
http://www.esjqroundwoter.org/.
The Subbasin is located to the west of the Sacramento-Son Joaquin River Delta (Delta)
and is bounded by the Sierra Nevada foothills to the east, San Joaquin River to the west.
Dry Creek to the north, and Stanislaus River to the south. In the eastern portion of the
Subbosin, groundwater flows from east to west and generally mirrors the eastward sloping
topography of the geologic formations. The western portion of the Subbasin.
groundwater flows eastward toward areas with relatively lower groundwater elevation.
Surface water flows from east to west. with the major river systems traversing the Subbasin
being the Calaveras, Mokelumne. and Stanislaus rivers.
According to the GSP, groundwater levels in some portions of the Subbosin hove been
declining for many years, while groundwater levels in other areas of the Subbasin hove
remained stable or increased in recent years. The change in groundwater levels varies
45
across the Subbasin, with the greatest declines occurring in the central portion of the
Subbasin. The western and southern portions of the Subbasin have experienced less
change in groundwater levels, in part due to the minimal groundwater pumping in the
Delta to the west and the import of surface water for agricultural and urban purposes.
SOUTH SAN JOAQUIN IRRIGATION DISTRICT SURFACE WATER SUPPLY
The City is a participant in the South San Joaquin Irrigation District (SSJID) South County
Water Supply Program. SSJID entered into a Water Supply Development Agreement in
1995 with the Cities of Ripon, Manteca, Lathrop and Tracy for the delivery of treated
surface water to supplement the municipal and industrial water supplies of these
communities. The purpose of the project is to provide a reliable supply of water to these
cities to reduce the potential negative impacts of over drafting the groundwater aquifers
providing the water supply to the various communities.
The City was initially slated to take delivery of up to 2,015 acre-feet of treated water after
completion of Phase I and has been allotted up to 2,799 acre-feet of treated water
through Phase II. The City opted to defer delivery of project water until Phase II to delay
costs implications on the City, therefore the City has relied on the groundwater supply in
the interim. The City of Escalon elected to sell its Phase I allocation of water to the City of
Tracy via the Escalon Amendment to Tracy-SSJID Water Supply Development Agreement
in 2006. Funds collected by the City of Escalon through these sales between 2003 and
2014 have been spent to retire debt service on the initial construction loan. Funds
collected since 2015 to current have been reserved for the City's future connection to
SSJID surface water system and amount $837,392.
In 2020, the City of Escalon entered into a new Agreement with SSJID which supe�seded
and replaced the 1995 Initial Agreement in its entirety, without disturbing the subsequent
side agreements between SSJID and individual Project Participants (e.g., Cities of
Manteca, Tracy and Lathrop). This new Agreement, known as Water Supply Agreement,
the City intends to preserve its ability to receive treated water from SSJID in the future
through existing facilities and subsequent construction of the Phase II Project facilities.
On September 16, 2021, the Escalon City Council directed staff and their consultant PACE
to present Configuration C to SSJID for connection to the Water Treatment Plant (WTP).
The primary facilities associated with the Configuration C SSJID project include the
transmission pipeline of about 18,000 linear feet to convey treated water from the WTP
transmission main to the City and the turnout facilities. This would include a flow control
assembly. 0.1O MG storage wet well and booster pump to be constructed in the northeast
corner of Hogan Park. The turnout and booster station would function to provide water
supply on a schedule, and either the distribution system or Roosevelt Tank will receive the
supply. The estimated costs for the SSJID connection is $4,877,600. The City of Escalon
continues to collect dollars from existing water users to fund these future improvements.
It is envisioned initially that the SSJID water will be used during the summer months. As the
population of Escalon grows, the SSJID water will be used as a reliable source of domestic
water for its current and future customers. The City. in coordination with SSJID, have
completed the initials surveys and preliminary alignment of the improvements. The City
and SSJID are in the process of completing the environmental, project timing and design.
46
The current schedule is for design to be completed in 2023, secure funding in 2024 and
begin construction in 2025.
TRANSMISSION AND DISTRIBUTION SYSTEM
The proposed distribution system improvements correlate to the water supply
improvements and would be constructed simultaneously with the water supply
improvements and/or as development occurs in a particular area of the City. The
planning boundaries and demands associated with full build out of the General Plan
planning horizons were used for planning distribution system improvements which are
higher than the market projections. A hydraulic model was used to size pipelines.
Distribution system improvements were sized based on the modeling results and
established criteria. input from City staff and review of the system. The primary objective
of the distribution system improvements is to ensure that adequate flow and pressure are
available throughout the system.
Current Conditions/Infill through 2030 Planning Horizon
Based on the reliable capacity of the existing system. the City has chosen to contract for
the completion of Well l A. The new well # l A is being designed to a capacity of 1,500
GPM's and should be of sufficient capacity to handle projected growth in the short-term.
The balance of the water improvements mentioned 2-4 will be funded based on
budgetary constraints adopted by the City Council. Additional wells and booster pumps
will be added to support new development based on the results of independent Water
Supply Assessments performed to comply with SB 6 l 0 findings and in compliance with the
Escalon Master Water Plan.
2030 through 2050 Planning Horizon
It is likely that in the long term. the City of Escalon will choose to fund necessary
improvements to support connection to the SSJID surface water treatment system. The
SSJID water will supplement the City's groundwater supply and provide a redundant
source of supply. The timing of the SSJID supply could vary depending on a number of
factors including: the actual demands in the City, schedule of the SSJID Phase II
expansion, and financial considerations associated with the necessary improvements.
The SSJID water supply is important from the City's long-term water supply and reliability
perspective as part of a conjunctive use program. but there is not an acute need for the
SSJID water to meet projected demands based on the market projections at least
through 2030, and probably sometime beyond that based on current expectations of
well yields in the area and the addition of the storage tank(s)/booster pump station.
As mentioned previously, the City of Escalon is drawing groundwater from an abundant
part of the Eastern San Joaquin County Groundwater Subbasin. Therefore, due to the
apparent ability of the groundwater supply to meet future demands, the City may have
opportunities to temporarily lease or sell a portion of its SSJID allotment to other project
Cities that do not have well capacity or other sources of supply. These opportunities
provide an interim solution to the other Cities. while potentially offsetting some of
Escalon's costs to participate in the project in the future.
The ability to receive surface water could be integral in the City's long-term plans such
as an aquifer recharge program. A recharge program would involve recharging the
47
aquifer using treated surface water from SSJID during the winter months when demands
at the water treatment plant are low, and there is excess capacity.
Water Supply Analysis
Build out of the General Plan Updated in 2019 will generate substantial increases in
demand for domestic water. The General Plan and the Water Master Plan (January 2007)
assume that future domestic water supplies will continue to be met from groundwater
wells as well as surface water from the SSJID project. Anticipated urban development
will require not only a substantial expansion of the City's water distribution but also
expansion of the supply through the development of new wells, storage and pumping
facilities.
The City's Water Mater Plan assigned costs to the anticipated water facilities
improvements and established a connection charge adequate to pay for necessary
improvements. Depending on the nature of the improvements and the amount and
timing of development, sufficient funds from connection charges may not fully fund the
capacity expansions in the short-term. In such cases it is typical for developers to provide
capacity in excess of their need with reimbursement from the City as additional
connections occur.
Specific onsite improvements within specific developments that are needed to provide
service to the development including distribution system piping, services, blow offs, fire
flows in excess of normal requirements, and other appurtenances will be financed by the
developer, constructed to City standards and deeded to the City. Since these "on-site"
improvements are paid for by the developer, they are not included or credited as an
offset to the connection charges.
General Plan build out and associated expansion of the City water well system will
increase demands on the underlying groundwater system. However, this increased
demand will be satisfied through the use of groundwater as well as the SSJID surf ace
water acquired through the City's participation in the South San Joaquin Irrigation District
(SSJID) South County Water Supply Program. Two independent water supplies in a
conjunctive use program will provide redundancy and reliability to the City's long-term
water supply. Therefore, the City has an adequate supply of water to meet the increased
demand through General Plan build out.
5.5 WASTEWATER COLLECTION AND TREATMENT
Upon incorporation in 1957, the City of Escalon acquired all of the facilities of the Escalon
Sanitary District. The facilities which make up the City's sewer system have been l)
acquired during incorporation. 2) constructed or 3) received as dedications from
developers.
The City of Escalon owns and operates two wastewater treatment and disposal systems:
The municipal system handles wastewater from residential, commercial, and small
industrial sources in the City; the industrial system handles wastewater from the food
processing industries in the City.
48
The City's sewer system including a 14-inch sewer trunk main in McHenry Ave was
constructed prior to 1950. Existing sewer diameters are not large enough. The majority of
the City's sewer system is eight inches in diameter or less. There are approximately
137,230 lineal feet (26.0 miles) of gravity and pressure sewer lines within the City's
domestic sewer system. Sewer sizes range from 6-inch to 14-inch diameter and are
composed of vitrified cloy, PVC. and asbestos cement pipe.
The sewer service area within the City limits encompasses approximately l . 130 acres of
land with the majority (42%) of the land use in the low to high density residential category.
The remaining areas are divided among industrial, commercial, park and open space.
and public facilities. with industrial representing the second highest land use at
approximately 34% of the total.
Reclamation of clean industrial wastewater. e.g .. cooling water, is being practiced by
the Escalon industries. Reclamation of the remaining high-strength industrial wastewater
and municipal wastewater is not likely because of readily available alternative sources
of water and the dominance of human food crop agriculture in the area, which cannot
be irrigated with reclaimed wastewater unless an extremely high (and costly) level of
treatment is provided. Accordingly, reclamation beyond that currently being practiced
by the industries with their clean cooling water does not appear to be a viable alternative
at this time.
Based on the City's historical success of land disposal on the site, and the available
groundwater data indicating no significant groundwater contamination from current
practices. land disposal via percolation and evaporation is feasible for the future.
Future treatment requirements for continued use of the existing and any expanded land
disposal fo cilities are expected to be comparable to the existing treatment requirements
covering both the industrial and municipal wastewater facilities (Regional Water Order
No. 87-087).
Per the Waste Discharge Requirements Order No. 5-00-142, the maximum monthly
overage dry weather flow for the domestic WWTP is 0.90 MGD and the maximum daily
flow shall not exceed 1.0 MGD. For the industrial WWTP, the monthly average dry weather
flow shall not exceed 2.0 MGD with a maximum daily flow of 3.0 MGD. The City's current
overage flow for domestic use is 0.5 MGD (53% of capacity) measured during the months
of July- November. pursuant to the Wastewater Master Plan, Version 3 prepared by PACE
Engineers, November 4, 2019. Each year. the City sends individual industries a permit to
discharge effluent into the City's WWTP. For example, the Industrial Waste Discharge
Permit for the Kroft Heinz Company limits the on-season and off-season flow (2.1 MGD
(monthly average) and 1 MGD (monthly average), respectively).
Influent flows are anticipated to increase to approximately 2.8 million gallons per day as
development occurs within the adopted General Pion growth boundary. Based on the
unit flow factor per equivalent single family dwelling unit (EDUs), the projected 2.8 million
gallons per day future flow represents approximately 8,400 future EDU's to be connected
to the sewer system. Currently, there are approximately 3,300 EDU's connected to the
system with on overage existing unit flow factor of approximately 21O gallons per day per
existing EDU.
49
Table 5-4 illustrates the existing and projected wastewater flows for the City of Escalon.
2019 through 2045 flow rotes were identified in the November 2019 City of Escalon
Wastewater Master Plan Version 3.0, dated November 4, 2019. For the purpose of this
document, the flow rates for through 2045 were extrapolated, based on the projected
growth/EDU's and the unit flow factor established in this document.
Table 5-4 Projected Wastewater Flow (mgd)
2019 2025 2035 2045
Average 0.5 0.6 0.8 0.9
Source: City of Escalon Wastewater Mosler Pion, November 2019
prepared by PACE Advanced Water Engineering
Existing sewer facilities were reviewed in the Escalon Sewer Master Plan of 2006 and areas
of planned expansion identified within the current sewer service area and each growth
boundary is shown in Exhibit 5-2. Current and future sewer service areas were identified
by sewer collection areas with defined connection points to the existing or future trunk
sewer facilities. Sewer system expansion will focus on major system improvements
necessary to increase sewer capacity or extend sewer service to currently unsewered
areas. Sewer improvements that provide benefit only to individual development projects
were not included in the master plan evaluation.
50
Exhibit 5-2 Proposed Wastewater Collection System Expansion
•---rw IPc , t.. - IA 1-r--,---, . .----r--•-· "'II:""
On September 24, 2014, the City received a Notice of Violation from the Central
Valley Regional Water Quality Control Board (CVRWQCB) which detailed violations
with Water Discharge Requirements Order 5-00-142. The Notice of Violation identified
the following violations of waste discharge requirements with regards to effluent
violations, odor violations, capacity violations, and discharge violations. Since 2014,
the City has completed a number of improvements that have addressed the Notice
of Violation and will be upgrading the plant through the City's Modernization Project.
Sewer improvements are grouped into four phases, these groupings are based on the
relative timing and need for the improvements and are summarized as follows:
• Phase 1 - Near-Term improvements to the existing sewer system to
provide capacity for immediate development.
• Phase 2 - Improvements needed to extend service to the Heritage Park
and Liberty Business Park areas. These improvements shall be installed
as Projects within Heritage and Liberty Business Park come forward.
• Phase 3 - Future improvements to the existing system to allow
conveyance of future flows through existing facilities (improvements in
addition to the "Near-Term improvements"). These improvements shall
be installed as development occurs and Development Applications are
processed through the City.
• Phase 4 - Sewer system expansion improvements, which consist of new
sewer lines to extend service to currently unsewered areas within the
City's growth boundaries. These improvements have been identified to
be installed beyond the 2025 as build out of the City's growth boundary
occurs.
Extension of sewer services to currently unsewered areas will likely follow the pattern
of actual development within each growth area, which is currently unknown.
Therefore, the proposed expansion plan outlined in the Wastewater Master Plan will
be used as a guide to developing sewer system expansion plans to future areas as
they are developed. Table 5-5 illustrates the proposed improvements and the triggers
for each. Since the City does not know which areas will develop first, it is difficult to
break down the improvements by years. Future improvements to the City's sewer
collection system will be based on existing and updated Master Plans.
52
Tobie 5-5 Proposed Sewer Improvements
Improvement When Needed
Near-Term Improvements
Gravity sewer 18-inch minimum diameter 1,400-foot Prior to connecting additional
length along future HWY 120 bypass east of McHenry developments to existing collection
Lift Station (4,305 gpm). system
Construct Phase I of new 6.2 MGD Ultimate Capacity This project has been completed.
City Main Lift Station to replace existing McHenry Lift
Station {Phase I at 3.1 MGD) (2,152 gpm).
Construct 9 ,000-foot 24-inch minimum diameter Prior to connecting additional
gravity sewer from new City Main Lift Station to the developments to existing collection
Escalon WWTP system
Improvements for Heritage Park Development ,,. -� �c,, (
Install 1,400-foot 12-inch minimum gravity sewer west- During construction of Heritage Park
east along Ullrey Av. and 1,400 24-inch minimum Phase 1
diameter gravity sewer north-south along Oklahoma
St. extension towards new 6.2 MGD Main Lift Station
Improvements for liberty Business Park Developments When Needed
1.900-foot 12-inch and 1,200 15-inch minimum During construction of 178 ac
diameter gravity sewers within the North Industrial development
Park
1,200-foot 18-inch gravity sewer along SR 120 south of During construction of 17 8 oc
North Industrial Park development development
Install 1 ,700-foot 12-inch minimum diameter force During construction of l 78 ac
main from LBPPS to new manhole located on development
Oklahoma St. and south of SSJID pipe
Install 2,500-foot 24-inch minimum diameter gravity During construction of 1 78 ac
sewers south along Oklahoma St. and its extension development
thru future Heritage Pork development to drain at
intersection of Oklahoma St. extension and Ullrey
Ave.
.
Improvements for Mure Developments
Install l ,400-foot 12-inch minimum gravity sewer along When flows in 14-inch McHenry Ave.
First St. from First/McHenry intersection to gravity sewer upstream of First/McHenry
First/Oklahoma intersection intersection are above 0.65 MGD
Install 3,000-foot 15-inch minimum gravity sewer from When flows in 8-inch gravity sewer on
manhole on Escalon Ave/Miller St. intersection west Escalon Ave. south of the La Mesa Lift
through Hogan Park then south-west through Arthur Station are above 0.38 MGD
Rd. and south along western property line of Escalon
Covenant Church across the railroad tracks and
south towards the LBPPS
53
Improvements for future Developments
Install 1 ,400-foot 12-inch minimum gravity sewer along When flows in 14-inch McHenry Ave.
First St. from First/McHenry intersection to gravity sewer upstream of First/McHenry
First/Oklahoma intersection intersection are above 0.65 MGD
Install 3.000-foot 15-inch minimum gravity sewer from When flows in 8-inch gravity sewer on
manhole on Escalon Ave/Miller St. intersection west Escalon Ave. south of the La Mesa Lift
through Hogan Park then south-west through Arthur Station are above 0.38 MGD
Rd. and south along western property line of Escalon
Covenant Church across the railroad tracks and
south towards the LBPPS
Replace existing 8-inch gravity sewer on Santa Fe When flows upstream of manhole on
Ave. between Santa Fe/Vine and Santa Fe/Franklin Santa Fe/Franklin intersection are above
intersections with 12-inch minimum diameter gravity 0.38 MGD
sewer
Replace and increase pumping capacity of Vine St. When inflows to lift station exceed
Lift Station to 0.72 MGD current 0.5 MGD pumping capacity
Replace existing 10-inch gravity sewer on Vine St. When flows upstream of manhole on
between Vine Lift Station and Santa Fe/Vine Santa Fe/Vine intersection are above
intersections with 12-inch minimum diameter gravity 0.65 MGD
sewer
Install 10-inch overflow line connecting manhole on When flows upstream of manhole on
Santa Fe/Vine intersection with manhole on St Santa Fe/Vine intersection are above
John/Countrywood intersection 0.65 MGD
Install 1 .400-foot 12-inch minimum gravity sewer along This option is provided in order to divert
Ullrey from McHenry Ave to new 24-inch interceptor flows from1 4-inch McHenry Ave. gravity
sewer
Replace existing 8-inch gravity sewer on Miller with When flows upstream of manhole at
1.900- foot 12-inch minimum diameter gravity sewer Miller /Westbrook intersection ore
above0.38 MGD
Install 2.100-foot 8-inch minimum gravity sewer from E. As a result of development on Drainage
Clough/McHenry Ave. intersection north along Basin 19
McHenry Ave. and west along Clough Rd.
Sewer System Expansion Improvements When Needed
Construct Phase II of new 6.2 MGD Ultimate Capacity When additional flows to the Lift Station
Main Lift Station (Phase II at 4.1 MGD) will increase the peak flow above 3. 1
MGD
Installation of 1.300-foot 10-inch minimum diameter After completion of Heritage Park
gravity sewer. 4,1 00-foot 12-inch minimum diameter development Phase 3 or any other
gravity sewer from Brennan Ave. east along Ullrey, development south east of Heritage
south alono Dahlin Rd .. and east alonq Clouqh Rd. Park develooment
Installation of 2,700-foot 12-inch minimum diameter As a result of any development south-
gravity sewer from Brennan Ave. east along SR 120 to west of NIP development
upstream invert to 18-inch gravity sewer placed as
part of the NIP develooment
Phased easterly extension of up to 3,200-foot 12-inch As a result of any development located
oravity sewer alonq Miller Ave. north-east of existino City limits
Construct Phase II of LBPPS 2.6 MGD Ultimate When additional flows to the Pump
Capacity Pump Station (Phase II at 1.7 MGD). Station will increase the peak flow
above 1.3 MGD
5 4
Installation of 1.400-foot 15-inch minimum diameter As a result of development east of
gravity the future HWY 120 by-pass and east of Drainage Basin 10
McHenry Lift Station.
Installation of 3,300-foot 10-inch minimum diameter As a result of development within the
gravity sewer along Catherine way and south towards northern area of Drainage Basin 18
future HWY120 by-pass
Installation of 3,300-foot 10-inch minimum diameter As a result of development within the
gravity sewer along Narcissus Rd. and North towards southern area of Drainage Basin 18
future HWY 120 by-pass
Installation of 2,800-foot 8-inch minimum diameter As a result of development on the
gravity sewer along Main St. and north-west towards south-east corner of Drainage Basin 17
Vine Lift Station
Installation of 1,700-foot 8-inch minimum diameter As a result of development on the
gravity sewer next to the railroad along the north-east western area of Drainage Basin 15
side of the future north industrial park
Increase Pumping capacity of new City Main lift When additional flows to the lift Station
Station to 6.2 MGD (Phase Ill) will increase the peak flow above 4. 1
MGD
Installation of 3,600-foot 12-inch minimum diameter As a result of development on drainage
gravity sewer from the Clough/Ellis intersection south basin 20
along Ellis, east along Jones Ave. towards 33-inch SS
Increase Pumping capacity of LBPPS to 2.6 MGD When additional flows to the Pump
(Phase Ill) Station will increase the peak flow
above 1.7 MGD
Construction of new 60,000 gpd lift station and force As a result of development of the
main to discharge at manhole at intersection of northern portion of Drainage Basin 5
Escalon Ave./libby Rd intersection
Source: City of Escalon Sewer Moster Pion, October 2006 os modified by the PACE reoort of 2019.
Wastewater Analysis
On-site sewer system improvements required by new development would be the
responsibility of developers and sub-dividers who must design, install and pay for
improvements the City Engineer determines to be necessary based on the Sewer
Master Plan. All improvements listed in the Sewer Master Plan have been included in
the Development Impact Fees and will be built when the trigger listed in Table 4-5 is
met. Major facilities would be financed based on timing of fees collected or
expected to be collected under a Development Impact Fee. The City of Escalon
continues to monitor the system and through the help of City Engineer, Bill Kull, has
focused their attention on upgrades to the McHenry Sewer lift station and the
replacement of the McHenry Ave gravity sewer line from 14 inches to 24 lnches. These
improvements and more are disclosed in the PACE report of 2019.
Demands for sewage disposal are significant but can be met with implementation of
the Sewer Master Plan as modified by the PACE report of 2019. The Master Plan is
monitored and updated to ensure that the infrastructure and fees are keeping pace
with the City's growth and inflation. The Development Impact Fee has an annual
escalation rate of 2.8% (per City Council Resolution No. 26-07) built into it to insure it is
keeping pace with inflation. The escalation rate (adjusted January 1st of each year)
55
is based on the ten 110) year average of the Engineering News Record's (ENR)
Construction Cost Index.
5.6 STORM WATER DRAINAGE
The City of Escalon's storm drainage system depends on South San Joaquin Irrigation
District (SSJID) existing system of irrigation laterals to transport storm drain runoff from
the City. These laterals run south and west to the Stanislaus River and the Lone Tree
Creek respectively.
Storm water runoff is collected from the urbanized portions of Escalon with a network
of detention basins and underground pipelines. There are ten storm system zones
throughout the City. Each zone has pipelines of varying size and detention basins to
accommodate storm water runoff.
There is an existing drainage shed within the City that utilizes interim retention basin
Storm Drain System 11. The basins within the existing systems are designed to reduce
the peak flow rates released to the SSJID laterals. Runoff is temporarily stored in the
basins then is pumped into the SSJID laterals at the reduced flow rate.
Storm Drain System 4 is the only system that does not discharge to a SSJID lateral.
Runoff collected by Storm Drain System 4 is pumped directly to the industrial ponds at
the City's waste water treatment plant.
SSJID owns the drains and laterals that convey the City's storm drainage to the local
surface waterways. The Master Plan was designed to meet SSJID requirements for
limiting storm water inflows to drains and laterals. The Master Plan also maintains the
integrity of SSJID facilities and includes provisions to meet the National Pollutant
Discharge Elimination System (NPDES) water quality restrictions.
Flooding is not a major problem, due to its distance from the 100-year floodplain.
According to the FEMA Flood Maps, the City of Escalon is in Zone X, 500-year flood
zone. The greatest external risk to flooding is the Stanislaus River, however, due to the
distance from the river and the topography (sloping toward the River) the City is out
of the 100- or even 200-year flood zone.
Localized storm damage occasionally occurs due to inadequacies in the drainage
system, particularly in the downtown area. The Storm Water Master Plan analysis
showed a number of potential areas that could sustain storm damage. By adjusting
detention basin and pump operating criteria, the potential flooding has been
alleviated and eliminated the violation of City standards. The Storm Drain Master Plan
will be used to optimize the design and operating conditions of future development
storm drain facilities to minimize possible violations of SSJID restrictions.
The City's 2005 General Plan Update establishes the planning area that will
encompass thirteen new drainage sheds. Utilizing the design criteria described in the
Storm Drain Master Plan and the land use designation described in the City's 2005
General Plan Update, the proposed storm drain infrastructure requirements were
developed for each future storm drain shed. Along with the requirements, a cost
56
estimate was also developed for each basin. Based on this cost estimate. a storm
drain connection fee was established for each basin.
The City's Post-Construction Standard Pion was established for the City to guide
project proponents and pion checkers through the various site design requirements
of the Phase II Municipal Separate Storm Water System (MS4) Permit. Each new
project, depending on size and the amount of impervious surface, is required adhere
to Post-Construction Standards and Best Management Practices IBMPs). Further, the
purpose of the document is to provided project proponents with information on how
to meet the State Water Board's requirements for mitigating the negative impact of
increases in storm water runoff caused by new development and redevelopment.
The goal is to incorporate Low Impact Development (LID) standards and
hydromodificotion management techniques. LID mitigates excessive runoff by the
use of control measures that utilize evopo-transpiration. infiltration, capture/reuse,
and biotreotment to mimic the runoff of a natural environment.
Storm Drainage Analysis
The City's Moster Pion was adopted in January 2008 and was prepared in consultation
with SSJID and is consistent with SSJID's system operating criteria. The Moster Pion was
predicated on the City's continued use of SSJID facilities for terminal drainage.
Escolon's current and future approach to handling storm water runoff is through the
construction of additional detention basins and eventually diverting the water to local
water courses through the SSJID conveyance system. The storm drainage system in
Escalon will be extended based on the City's growth and following the Storm Water
Moster Pion. The Storm Drain system is split up into a number of discharge areas as
illustrated in Exhibit 6-1, Storm Drain Areas. Discharge areas include discharging into
the SSJID system, the City's WWTP, and on-site basins for areas that ore undeveloped
or ore existing ronchette parcels. The majority of the City discharges into the SSJID
system.
The Storm Drain Moster Pion took into consideration the City's General Pion growth
boundaries when analyzing the storm water needs. The Master Plan also established
the cost to develop each of the storm drain basins needed to accommodate
ultimate build out of the General Plan. Based on these calculations, the City adopted
a new storm drain connection fee and hos thus planned for the eventual build out of
the City General Plan boundary.
5.7 DETERMINATION
As the City of Escalon continues to grow, there will be a need to expand services.
With the recently updated General Plan and Moster Plans, the City hos already begun
planning for potential expansion of services.
Law Enforcement
The City of Escalon provides adequate low enforcement services to meet the needs
of the existing population.
The City of Escalon has planned for the anticipated growth in population and
associated need for law enforcement capital improvements to the year 2050 by
57
incorporating these needs into a Development Impact Fee Nexus Study. The City will
be able to pay for the additional law enforcement operational needs through the
expanded tax base generated by new development. Capital costs for facilities and
equipment will be funded through development fees collected from these new
developments. The City's Police Department will continue to monitor these fees to
ensure that the fees collected are adequate to serve the expanded needs of the
City.
Fire Protection
The fire protection needs of the City are currently being provided by the Escalon
Consolidated Fire Protection District (EFD}.
Escalon, the 2030 growth boundary and the City's Sphere of Influence are all within
the service boundary of the Fire District so the Fire District will continue to serve the
land within the City boundaries as well as the land in the SOI. As the City grows and
the capital expenditures and staffing needs increase, the City will need to work
closely with the Escalon FD to ensure that the Fire District is able to adequately service
the additional population generated by the annexation of additional land into the
City. This may mean that the City establishes a contract with the Fire District for the
required level of services needed by the City or the City and District work together to
implement a public safety tax.
Since the fire facility fee has not been reviewed or increased since the early 1990's, it
is suggested that the Fire District commission a nexus study to determine the
appropriate fee with a built-in escalation rate for new development so that the Fire
District can adequately accommodate the projected growth. The Chief is currently
putting together a request to his board to increase the fee which once adjusted will
adequately fund the necessary expansion of the Fire District due to new growth.
Water Supply
The City has an adequate water supply and provides adequate water service to the
residents of the City.
General Plan build out and associated expansion of the City water well system will
increase demands on the underlying East San Joaquin Groundwater Subbasin
groundwater system. However, this increased demand will be satisfied through the
use of groundwater, recharging efforts as well as the SSJID surface water acquired
through the City's participation in the South San Joaquin Irrigation District (SSJID} South
County Water Supply Program. Two independent water supplies in a conjunctive use
program will provide redundancy and reliability to the City's long-term water supply.
The Water Master Plan also sets a connection fee which offsets the costs of new
development through build out of the General Plan. The City has developed a
schedule of improvements and triggers through the year 2050 which will ensure that
the water systems grows in conjunction with the City's future expansion. Therefore, the
City has an adequate supply of water and water system to meet the increased
demand through General Plan build out.
Wastewater Collection
The City provides adequate wastewater services to meet the needs of the existing
58
population.
On-site sewer system improvements required by new development would be the
responsibility of developers and subdividers who must design, install and pay for
improvements the City Engineer determines to be necessary based on the Sewer
Master Plan. Major facilities would be financed on the basis of fees collected or
expected to be collected as part of the sewer connection fee established by the
Sewer Master Plan and adopted by the City Council.
Demands for sewage disposal are significant but can be met with implementation of
the Sewer Master Plan which took into consideration the ultimate build out of the
General Plan and the connection fee established by the Master Plan. The Master Plan
outlines the improvements needed and the phasing of the improvements depending
on where the growth occurs through the General Plan build out. The Master Plan will
be monitored and updated to ensure that the infrastructure and fees continue to
keep pace with the City's growth and inflation.
Storm Water Drainage
The existing storm water drainage system is adequate for serving the needs of
Escalon's population.
Development will place increasing demand on the City's storm drainage facilities and
create a need to expand the capacity of the City's storm drainage facilities.
Individual developments will provide necessary improvements to their projects based
on the City's Storm Water Drainage Master Plan. A storm drainage fee imposed on
the new residential and nonresidential land uses will be used to fund the expansion
and improvement of the City's storm drainage facilities and thereby meet the
increased demand caused by these development types.
The Storm Drain Master Plan took into consideration the City's ultimate growth
boundaries when analyzing the storm water needs. The Master Plan also established
the cost to develop each of the storm drain basins needed to accommodate
ultimate build out of the General Plan. Based on these calculations, the City adopted
a new storm drain connection fee and has thus planned for the eventual build out of
the City to 2050.
59
6 FINANCIAL ABILITY OF AGENCIES TO PROVIDE SERVICES
This section evaluates the funding mechanisms available for the provision of
expanded services in Escalon to meet the future needs for fire, police, water,
wastewater and storm water infrastructure.
6.1 DEVELOPMENT IMPACT FEi
In 2016, the City hod David Taussig & Associates, Inc. update their Development
Impact Fee Justification Study. This study, updated through the year 2036, the costs
of new development. The study assumed a population of 8.403 by the year 2036.
Development impact fees are charged to fund improvements to the City's public
buildings, storm drainage, sewer and water supply and distribution systems and
roadway networks. Other fees needed to offset impacts identified during the
development application/environmental review process are also being charged to
a proposed project. Development Impact Fees are collected on a 1,000 square foot
basis for non-residential uses and a per dwelling unit basis for residential uses.
Table 6-1 depicts the current Development Impact Fees that are currently charged
to new development.
Table 6-1 Development Impact Fee Summary for New Development In Escalon
Single Multi- Commercial Office
Facility Type Family Family (per 1,000 Sq. (per 1,000
(per unit) {eer unit) Ft) Sa. Ft.)
Porks &
$14,876 $11.900 no no
Recreation
Transportation $1,258 $729 $4,690 $4,690
Police $2,304 $1,843 $1,600 $1,200
City Hall $1.021 $817 $710 $532
Public Works $1,090 $871 $757 $568
Administration $620 $488 $236 $212
Library $140 $111 $96 $72
TOTAL $21,309 $16,759 $8,089 $ 7 , 2 7 4
Industrial Institutional
(per 1,000 (per 1,000 Sq.
S9. ft) Ft.)
no no
$1,220 $2.346
$400 $200
$177 $88
$189 $95
$61 $82
$24 $13
$2,071 $2,824
Source: Cily of Escalon Fee Schedule for FY21-22. Developmenl Impact Fee Justification Study.
David Taussig & Associates, Inc .. December 16. 2016
6.2 CONNECTION FEES
After the General Pion was updated in 2005, the City began updating its water, sewer,
and storm drain master plans. Through these master plan updates the City has
documented existing deficiencies as well as the cost of expanding City services to
the properties within the SOI boundaries identified in the updated General Plan. The
following tables illustrate the current connection fees, effective July l. 2021.
60
established by the Master Plans for water (Table 6-2). sewer (Table 6-3) and storm drain
(Table 6-4).
Table 6-2 Water Connection Fee
SERVICE TYPE CONNECTION FEE
RESIDENTIAL
Single Family $10.463 per unit
Duplex $14,328 per duplex
Multi-unit & Apartments Site Specific
NON-RESIDENTIAL (meter size)
5/8a nd ¾ inch $10,463
1 inch $17,790
1 ½ inch $33,173
2 inch $55,452
3inch $122.554
4 inch $219,720
6 inch $488.619
Table 6-3 Sewer Connection Fee
TYPE CONNECTION FEE
Single Family (per unit) $6.683
Multi-Family (per unit) $5,569
Note 1: Fees effective January I. 2020.
Note 2: Fees indicated in Tables 5-2 through 5-4 ore from the City of Escalon
Infrastructure Moster Plans. January 2007 and ore estimates based on
assumed improvements financed; however, the improvements to be
financed still hove not been determined and fees may adjust.
Sewer Connection Fees are based on equivalent dwelling units (EDU). EDUs are units
of measure that standardize all land use types (housing, retail, office, etc.) to the level
of demand created by one single-family housing unit. The fee for each land use type
is based on the gallons per day usage, where the EDU is 250 gpd. Therefore. a use
demanding 500 gpd would equal 2.0 EDU's.
61
Table 6-4 Storm Drain Connection Fee
AREA/TYPE fee (per
Industrial
N/A
Acre}
Drainage Area 5
Drainage Area 11 A
Single-Family Residential $9,780
Commercial $65.110
Multi-Family Residential $13,980
Industrial $61,500
Commercial $24,990 Drainage Area 11 B
Industrial $19.560
Single-Family Residential $32.120
Drainage Area 6
Multi-Family Residential $45,880
Single-Family Residential $9.300 Drainage Area 11 E
Drainage Area 6(Future).
$18.270 Single-Family Residential $30,030
SFR
Drainage Area 11 F
Multi-Family Residential $13,300
Commercial $94,980
Commercial $22.590
Drainage Area 11 G
Industrial $18,800
Drainage Area 7 Single-family Residential $28,310
Commercial $72.770
Single-Family Residential $7.300
Drainage Area 7B Drainage Area 11 H
$42.130
(Future).SFR
Single-Family Residential $38,790
Multi-Family Residential $14,600
Drainage Area 111
Drainage Area 7 A
$72,630
(Future). MFR Single-Family Residential $31.240
Commercial $17.740 Drainage Area 111-1. SFR $78.610
Drainage Area 7B
$108,340 Multi-Family Residential $58,020
(Future), COMM
Drainage Area 11 J
Industrial $14.600
Single Family Residential $24,430
Drainage Area 8
Commercial $62,820
Single-Family Residential $11.230
Industrial $59,320
Drainage Area 8
$5,640
!Future I. SFR Drainage Area 11 K
Multi-Family Residential $16,070
Industrial $56,730
Commercial $27.290
Drainage Area 11 L
Drainage Area 8
$14.520 Single-Family Residential $23.970
(Future), COMM
Industrial $22.480 Multi-Family Residential $44,520
Drainage Area 11 (Future) Industrial $58,210
Single-Family Residential $35,910 Drainage Area 11M
Multi-Family Residential $66,680 Single-Family Residential $29.300
Commercial Industrial $71,150
N/A
62
Legend
C]Parods
:.':I Oty Umils
ol lnftuence
-Sphere
Storm Drainage Areas
CJ Drain 10
-DralnlM
D 0ra1ns
D 0ra1n6
D
0rain1
Iii!! Drains
D 0ra1n9
Exhibit 6-1 Storm Drainage Areas
63
The Master Plans take into consideration the full build out of the General Plan and all
the connection fees have an annual fee adjustment. The fees are adjusted
st
automatically every year on January 1 based on the ten ( 10) year average of the
Engineering News Record's Construction Cost Index.
6.3 FIRE FACILITY FEE
The Escalon Consolidated Fire Protection District (EFD) is a stand-alone district with no
ties to the City other than providing fire protection services to the residents and
businesses. The EFD is responsible for 100% of the costs to run the District. The City of
Escalon collects the $0.16 per square foot Fire Facility Fee for the District when a
building permit is pulled.
The fire protection needs of the City are currently being met by the EFD. However, as
the City grows and the capital expenditures and staffing needs increase the City will
need to work closely with the EFD to ensure that the Fire District is able to adequately
service the additional population generated by the annexation of additional land
into the City. This may mean that the City establishes a contract with the Fire District
for the required level of services needed by the City or the City and District work
together to implement a public safety tax.
6.4 FINANCIAL ANALYSIS
The following discussion and analysis provides an overview of the City's financial
activities for the fiscal year ended June 30, 2021.
Financial Highlights
• The City's assets and deferred outflows of resources exceed its liabilities and
deferred inflows of resources at its close of the 2020-21 fiscal year by $60.8
Position). (Unrestricted Net Position)
million (Net Of this amount, $7.4 million
is designated to be used to meet ongoing obligations to citizens and
creditors; $7.1 million is restricted for capital projects, debt service, and
legally segregated taxes and fees: and $46.3 million is invested in capital
assets.
• As of June 30, 2021, the governmental funds reported a combined Net
Position of $35.5 million, of which $8.4 million is available to meet the City's
(Restricted, Committed, Assigned, and
current and future needs
Unassigned Balances).
• As of June 30, 2021, the General Fund's fund balance was $4.4 million which
$.25 million is designated as Non-Spendable for items such as deposits,
prepaid assets, loans, and inter-fund advances. Assigned/Committed fund
balance was $3.3 million, set for operating services, debt service,
equipment replacement, and Cal PERS reserve, and the unassigned
balance is $.88 million.
• Governmental capital assets increased by $1 .8 million compared to prior
year assets which includes improvements to the HV AC systems at the Police
Building and the Library, lighting in the ballfields, street and sidewalk
64
improvements, and various equipment additions and disposals. The
increase is reflected in the net investment in capital assets.
• The City's total long-term liabilities increased by $5.0 million compared to
the prior year primarily due to the new energy lease with Sterling National
Bank and offset by water bond and other loan payments.
Government-wide Financial Statements
The Government-wide Financial Statements provide a longer-term view of the City's
activities as a whole and are presented in a manner similar to a private-sector
business. These statements are comprised of:
Statement of Net Positions - Presents information on all City assets and deferred
outflows of resources and liabilities and deferred inflows of resources, with the
difference between as Net Position. Over time, increases or decreases in Net Position
may serve as a useful indicator of whether the City's financial position is improving or
deteriorating.
Statement of Activities - Presents information reflecting any change in the
government's net position during the most recent fiscal year. All net position changes
are reported as soon as the underlying event giving rise to the change occurs
(regardless of the timing of related cash flows). Thus, revenues and expenses are
reported in this statement for some items that will only result in cash flows in future
fiscal periods (e.g., earned but unused vacation and compensated time leave).
Both of the Government-wide Financial Statements distinguish functions of the City
that are principally supported by taxes and intergovernmental revenues (government
activities) from other functions that are intended to recover all or signification portion
of their costs through user fees and charges (business-type activities).
• Government activities - All of the City's basic services are considered
governmental activities, including general government, community
development, library, public safety, public works, parks and recreation, and
streets. These services are supported by general City revenues such as
taxes and specific program revenues such as developer fees.
• Business-type activities - All of the City's enterprise activities are reported
here, including sewer, water, storm, and transit. Unlike governmental
services, these services are supported by users' charges based on the
amount of the service they use.
Fund Financial Statements
The Fund Financial Statements report the City's operations in more detail than the
Government-wide Statements and focus primarily on the short-tern activities of the
City's General Fund and other Major Funds. The governmental Fund Financial
Statements measure only current revenues and expenditures and fund balances;
they exclude capital assets, long-term debt, and other long-term amounts. Enterprise
Fund Financial Statements are prepared on the full accrual basis, including all their
65
assets and liabilities, current and long-term. Each Major Fund is presented individually,
with all Non-major Funds summarized and presented only in a single column.
Subordinate schedules give the detail of these Non-major funds. Major Funds show
the major activities of the City for the year and may change from year to year as a
result of changes in the pattern of the City's activities.
A "fund" is a grouping of related accounts used to maintain control over resources
that hove been segregated for specific activities and objectives. All of the City's
funds can be divided into three categories: governmental funds, proprietary funds,
fiduciary funds.
• Governmental Funds - These funds are used to account for essentially the
same functions reported as governmental activities in the Government
wide Financial Statements. Governmental Fund Financial Statements focus
on near-term inflows and outflows of spendable resources and are
therefore prepared on the modified accrual basis. Capital assets and other
long-lived assets, along with long-term liabilities, are not presented in the
Governmental Fund Financial Statements.
• Proprietary Funds - The City maintains two different types of proprietary
funds; Enterprise Funds and Internal Service Funds. Enterprise Funds are
used to report the same functions presented as "business-type activities" in
the Government-wide Financial Statements. Financial statements for
proprietary funds are prepared on the full accrual basis and include all their
assets and liabilities, current and long-term. Internal Service Funds ore used
to account for services or activities performed by one ( 1} Department for
the benefit of other City Departments on a cost reimbursement basis.
Proprietary Funds are inclusive of both Enterprise and Internal Service Funds.
• Fiduciary Funds - These funds are used to account for resources held to
benefit parties outside the government. Fiduciary Funds are not reflected
in the Government-wide Financial Statements because those funds'
resources are not available to support the City's programs. The City of
Escalon has no current Fiduciary Funds.
Government-wide Financial Analysis
Net position - As noted earlier, net position may serve over time as a useful indicator
of the City's financial status. In the case of the City, combined net position
(government and business-type activities} totaled $60.8 million at the close of the
Fiscal Year Ended June 30, 2021. This is an increase of $800,000 from June 30, 2020.
The following table reflects the Summary of Net Position for the Fiscal Year Ended June
30, 2021, with comparative data for the Fiscal Year Ended June 30, 2020.
66
Cil)· of Eualon
Net Position as of June 30, 2021
(i.a millio� of clolbr.)
,.,,._�
Gowm�I TCIUI Toul
�s Adi'filMs ,.c:11"'
MA, Mi 26'AI Bi 2ib6 tii I
<:811 and IINHtments 10.e 11.1 10.II 11.3 21.5 22.4 4.1%
ClaMfAsNts 1.0 0.0 0.7 0.8 1.7 1.7 .,.n.
CaipiblAssets 32.7 3U 18.1 20.11 50.7 55.4 0.2%
T01'Al ASSETS W.S 20.7 tilf tU ,u 1.H.
0.7 0.7 0.2 02 O.t 0.0 0.0%
� LNllifitiftoutstMdng 7.5 IU 5.1 7.3 12.e 17.8 41.3%
oaa., lubilitift 0.7 o.e 0.8 0.4 1.5 t.O -31.0%
'IOTAL UA8UTIES e it.i BJ 7.7 AJ 10 i63i
DlftmlOf Pwnsion� o.e o.e 0.2 0.2 0.7 0.7 0.0%
2U 28.8 14.3 17.5 44.1 4U 5.0%
o.5 72 0.0 0.0 u 12 10.4%
0.0 .C,.5
m
0.4 7.8 0.4
au
7.3 -22.2%
D.2 !B.S Si 86.d -di\
The City's Government-wide Net Position as of June 30, 2021, comprised the following:
• Cash and investments comprised of $22.4 million in the City treasury.
• Government-wide receivables were comprised of $1.5 million of current
receivables and $180,000 of long-term receivables. Long-term receivables
are related to property loan and inter-fund loans.
• Net capital assets of $55.4 million include the City's infrastructure in addition
to all other City assets.
• Restricted Net Position. totaling $7.2 million. Restricted Net Assets ore those
resources that ore subject to external restrictions on how they may be used.
These restrictions are established by bond covenants or restrictions on the
use of funds by state or federal regulations.
• Unrestricted Net Position totals $9 .9 million and is designated to be used to
finance day to day operations without constraints established by debt
covenants or other legal requirements or restrictions. While these assets are
technically unrestricted, most of these assets are committed or assigned for
a specific use.
The Change in Net Position. as expressed, as the change in revenues and
expenditures through June 30, 2021. is further reflected in the Statement of Activities.
67
Ci�· of f:�calon
Sraremenr of Acrhitie�
Fiscal �·ea1· ended June 30, 2021
(In Million�)
GoYemmental Activities BusS)eSS-Type Activities Total
20RJ 202, 2020 202i 2020 202,
Revenues
Program Rewnws
Charges for sefVices S 1.05 S 0.93 S 4.96 $ 5.01 6.01 5.94
()pefating s,-ants and
contributions 0.20 0.29 0.05 0.07 0.25 0.36
Qapital Grau and •---·m-
� 0.73 0.68 ---....s. o.. . . 0.73 0.68
Total Pf'9M'I revenues Ui 6.98
()pefating Revenues
Taxes:
Property taxes 1.86 1.95 1.86 1.95
Sales laxes 1.G7 1.23 1-07 1.23
Othef'tues 0.64 0.63 0.64 0.63
lnlefeat Income 0
.
.38 0.06 0.34 0
.
. 04 0.72 0.. 10
Othef' Revenue
T T ota ota l l Revenue Operating Revenues ---r 3 .94__ ___3 ,,...8.,.7 __..,.. o.34..,.._ __o ji..,. 0411"' ____, ,.4.29 _. ___"7 r: 3.9 i, 1 r- _ _ __:.; u 2.:.. ;;._ _ _ .:.. s _.' N - _ _ __ u _ __& _ _ .:.. .:.:&. :.12 _ _ __, _1 u ;;.. 1_ _ ___ 1 .__n_ 0
Expenm
General govemmenl 0.33 0.19 0.33 0.19
flublic:Salety 3.03 3.51 3.03 3.51
Public Wor11s 1.18 1.17 1.18 1.17
Cormuvty Devdopment 0.74 0.71
Culue aid leis..-e 0.72 0.88
Interest & Fiscal Chwges 0.13 0.09
Wars 1.24 1.14
SNer 2.B7 1.99
StOffll 0.27 0.23
Transit 0.17 0.20
Totalf.lpenses 6.55 4.55 3.56
Changes in net position
before transfers (0.20) (0.78) o.ao 1.56
Transfers • •
oJo
change in net position (0.201 10Jii 1.56 ·
Net Position-8eginning 36.43 36.23 22.98 23.78
0 7. 4 0 7. 1
0.72 0.88
0.13 0.09
1.24 1.14
2 .B 7 1 99.
0.27 0 .2 3
0.17 0.20
10.67 10.11
0.60 0.78
0.60 0.78
59A1 io.01
Prior Period A4ustment
Net PositiOn, End of Yew ...:S�_.;.63 ;;;: .2 ::; 3 ;._.;: S�--=-35 ::.:. .4 .;.;: 5 :.,.._ ...:1 :__ --=23�.7 ;;.;; 8 ;......: S :.,.._ ....::;25. ::; 34�......:S :..._ �60::.:.0. ::.:1;......:S:..._�60;:.;f• ;.;;_9
Revenues
Revenues for the City totaled $10.89 million for the year ending June 30, 2021. Total
governmental program revenues had an decrease of $70,000 or 4% from the previous
year. The decrease is primarily due to the impact of COVID-19 requirements on facility
rentals and recreation programs. Total business-type activities revenues experienced
a minor increase in revenues of $70,000 or 2%. Both segments experienced revenue
decreases from lower interest rates.
Expenses
Expenses for the City totaled $10.11 million for the year ending June 30, 2021.
Governmental activities incurred $6.55 million of expenses while business-type
activities incurred $3.56 million. Of the Governmental Activities, the increased
expenditures from prior fiscal year were in Public Safety within nearly all other
departments showing spending reductions.
68
Governmental Activities
Government Activities represent the core services provided to citizens and include
public safety, public works, department services, culture and leisure and general
government services.
Total governmental activities revenues of $5.77 million were less than the prior fiscal
year by $148,200 or 3% due to interest income from low interest rates offset by normal
property and sales tax increases in fiscal year 2020-21.
City of Escalon
Program Expenditures
Governmental Activities
For the Year Ended June 30, 2021
Functions/Pro,:rams Emenses %of Total
s
General 1ovemment 190.003 2.gmj
Public safety 3,506.472 S3.54'Jll
Public works 1,172.233 17.9ml
Develonment Services 713.910 10.9mli
Cultural and leisure 879.665 13.43"
Interest and fiscal charaes 86,713 1.32'Jll
s
Total 6,548,996 100.�
69
City of Escalon
Revenues by Source-Governmental Activities
For the Vear Ended June 30, 2021
■ Interest
■
Charges for Services
16%
■Gt.lllltS & ConltlbullonS
Total governmental activity expense for the year were $6.55 million. Public Safety
accounts for 53.54% of the core services expenditures which are greater than the prior
fiscal year by $474,000 primarily due to the one-time payment of $500,000 to CalPERS.
This payment was made from the funds designated for CalPERS to assist in offsetting
future unfunded liabilities. The table that follows shows the expenditure in each of the
departments and the chart reflects the percentage of each service.
City of Escalon
Program Expenditures
Governmental Activities
For the Year Ended June 30, 2021
Functions/Programs Expenses % of Total
s
General aovemment 190,003 2.90%
Public safetv 3,506,472 53.54%
Public works 1,172,233 17.90%
Development Services 713,910 10.90%
Cultural and leisure 879,665 13.43%
Interest and fiscal charges 86,713 1.32%
Total $ 6,548,996 100.00%
70
------------------------------------.
Oty of Escalon
&penses by Function-Governmental Activities
Fo, lhe Year Ended June 30, 2021
Genera.I Gowwn-t
2.K
■P\lllkWolb
■°"'4Clpfflltll Stml:ift
Business-type Activities
Revenues of the City's business-type activities exceeded expenditures by $1.52
million. A significant expenditure reduction of $881,000 from the prior fiscal year is
reflected in sewer services. For the prior fiscal year, expenses included the cost for
both the 2018 and 2019 sludge removals and the Wastewater Treatment Plant study,
resulting in a large increase in expenditures. The Wastewater treatment plant also
experienced reduce cost in pond treatment, as well as pond and aerator
maintenance. Business-type activities ended the year with a Net Position of $25.34
million, increasing by 7% over the prior fiscal year.
Changes in Business-Type Activities by Program
Fiscal Year Ended June 30, 2020
(in millions of dollars)
Net Revenue fexcludes non-ooeratina & interest)
2020 2021
water �ervices $ 0.61 $ 0./9
Sewer -Industrial Services (0.311 0.43
Sewer -Domestic Services 0.34 0.44
Total Sewer 0.03 0.87
co.ot
Storm Drain Services C0.07'
Transit Services (0.11' C0.121
-s
lo tal Business-tvrM! Activities 0.46 $ 1.52
71
Financial Analysis of the City's Funds
The City's Governmental Funds focus is to provide information on near-term inflows,
outflows, and balances of spending resources. Such information is useful in assessing
the City's financing requirements. The classification of spendable fund balances to
committed, assigned, and unassigned is intended to help measure the resources
available for spending at the end of the fiscal year. In particular, unassigned fund
balances may serve as a useful measure of a government's net resources available
for spending at the end of the fiscal year.
On June 30, 2020, the City's governmental funds reported combined fund balances
of $8.68 million, a decrease of $2.45 million or 22% compared with the prior year. This
decrease is due to capital outlay expenditures for the Energy Project of $2.56 million
that is expected to provide many years of energy cost reductions. The General Fund
and all other funds had positive fund balances except for the Transit Fund which is
dependent on reimbursable grant funds and the City Hall Fees fund which is repaying
other Impact Fee Funds for the purchase and improvements of a building in both 2011
and 2013.
General Fund
General Fund revenues increased by $236,000 or 6% compared to fiscal year-end
2020. Sales tax increased by 15% and Property taxes increased by 5%. General Fund
expenditures of $4.8 million are an increase of almost $1 million or (26%) over prior year
expenditures of $3.58 million. The increase was primarily in Public Safety, which
included the $500,000 payment to CalPERS along with increases in personnel services
and vehicle repairs.
On June 20, 2021, the General Fund balance comprised $0.25 million in non
spendable balances, $3.32 million of assigned balances, and $.88 million in
unassigned balances. Fund balances have been classified following GASB 54. While
amounts have been categorized as unassigned, they may be informally earmarked
by the City council for specific purposes.
Proprietary Funds
The City's Proprietary funds provide the same type of information found in the
Government-wide Financial Statements but in more detail. The City's Proprietary
Funds are comprised of the Water Fund, the Sewer Fund, the Storm Drain Fund, and
the Transit Fund. Proprietary Fund's net position totaled $25.3 million on June 30, 2021.
Proprietary operating revenues were $4.9 million, and operating expenses were $3.4
million in the fiscal year 2021.
Water Fund
The net position of the Water Fund is $13.9 million. Approximately $4.7 million of the
Fund's net position was unrestricted at the fiscal year-end with net investment in
capital assets of $9 .2 million.
72
The year's activities were $1.8 million in operating revenues and $1.1 million in
operating expenses. Charges for services showed an increase of 15.0%, resulting from
the schedule of rates adopted in 2019. Operating expenses decreased by 8% from
the fiscal year 2020, with the largest decreases in emergency repairs, consultant cost
for rote study and S8998 Water Disconnection policy implementation.
Sewer Fund
The net position of the Sewer Fund is $8.7 million for the current year. Operating
revenues for the fiscal year 2021 were $2.8 million, a decrease of $0.03 million from the
fiscal year 2020. The decline is a result of changes in industrial users discharges.
Operating expenditures had a decrease from the fiscal year 2020 of 32%. For the
fiscal year, 2020 expenses include the cost for both the 2018 and 2019 sludge removals
and the Wastewater Treatment Plant study, resulting in a large increase in
expenditures. The Wastewater treatment plant also experienced reduce cost in pond
treatment, as well as pond and aerator maintenance. A total of $3.4 million of the
fund's net position is invested in capital assets, with $5.3 million unrestricted.
Storm Drain
The net position of the Storm Drain Fund is $2.5 million for the current year. Operating
revenues for the fiscal year 2021 were $.18 million. Operating expenditures had a
slight decrease from the fiscal year 2020. A total of $2.1 million of the fund's net
position is invested in capital assets, with $.36 million unrestricted.
Transit Fund
The net position of the Transit Fund is $.13 million for the current year. The year's
activities were $78,510 in operating revenues for the current year and $196,888 in
operating expenses. A total of $.12 million of the fund's net position is vested in capital
assets, with $0.01 million unrestricted.
Risk Management
The City of Escalon participates with other public entities in a joint exercise of powers
agreement, which establishes the Central San Joaquin Valley Risk Management
Authority (CSJVRMA}. The relationship between the City and CSJVRMA is such that
CSJVRMA is not a component unit of the City for financial reporting purposes.
The City is covered for the first $1,000,000 of each general liability claim and $250,000
of each workers' compensation claim through the CSJVRMA. The City has the right
to receive dividends or the obligation to pay assessments based on a formula which,
among other expenses, charges the City's account for liability losses under $10,000
and workers' compensation losses under $10,000.
The CSJVRMA participates in an excess pool which provides general liability coverage
from $1,000,000 to $10,000,000. The CSJVRMA participates in an excess pool that
provides workers' compensation coverage from $250,000 to $500,000 and purchases
excess insurance above the $500,000 to the statutory limit.
73
The CSJVRMA is a consortium of fifty-four (54) cities in San Joaquin Valley, California.
It was established under the provisions of Government Code Section 6500 et seq. The
CSJVRMA is governed by a Board of Directors, which meets 3-4 times per year,
consisting of one member appointed by each member city. The day-to-day business
is handled by a management group employed by the CSJVRMA.
6.5 DETERMINATION
Escalon receives funds for the provision of public services through development fees,
property taxes and connection and usage fees. As land is annexed into the City from
the SOI, these fees will apply. The City reviews these fee structures every two years
and indexes the fee on an annual basis to ensure that adequate funds are collected
to cover the provision of City services to existing as well as new residents.
The Escalon CFPD is responsible for the fire protection services in the City of Escalon.
As the City grows and the capital expenditures and staffing needs increase, the City
will need to work closely with the Escalon CFPD to ensure that the Fire District is able
to adequately service the additional population generated by the annexation of
additional land into the City. This may mean that the City establishes a contract with
the Fire District for the required level of services needed by the City or the City and
District work together to implement a fire mitigation fee or a public safety tax.
Since the fire facility fee has not been reviewed or increased since the early 1990's, it
is suggested that the Fire District commission a nexus study to determine the
appropriate fee with a built-in escalation rate for new development so that the Fire
District can adequately accommodate the projected growth. The Chief is currently
putting together a request to his board to increase the fee which once adjusted will
adequately fund the necessary expansion of the fire department due to new growth.
74
7 STATUS OF, AND OPPORTUNITIES FOR, SHARED FACILITIES
The following outlines any existing and/or potential opportunities for Escalon to share
facilities and resources.
Fire Protection
Fire protection and emergency medical services are provided by the Escalon
Consolidated Fire Protection District (EFD). The EFD does not have a contract with the
City to provide these services however, the City is within their service boundary.
Law Enforcement
The City has an Agreement with the City of Ripon for Police Dispatch Services 7 days
a week / 24 hours a day. The Agreement began in 2001 and a new Agreement was
adopted by City Council on August 1, 2022 for Police Dispatch Services for another
ten (1 0 years), expiring on June 30, 2032.
Library Services
On October 20, 1998, San Joaquin County and the City of Stockton entered into an
Agreement to provide free public library services within the San Joaquin County. The
Agreement stipulates the operation of branch libraries in various parts of the County
outside the City of Stockton and the City of Lodi, library operation including but not
limited to programs and services, staff, library materials, resources and tools that
directly support the mission of the library. The Escalon Branch Library is part of the
Stockton-San Joaquin County library system and is open Monday through Saturday
(closed Sundays). Hours of operation and services provided by the Escalon Branch
Library can be found on the Stockton-San Joaquin County website:
https://www.ssjcpl.org/locations/county /escalon.html.
Escalon Unified School District
The partnership with the Escalon Unified School District is ongoing and includes joint
use of the swimming pool and other recreational facilities as well as a program to
share large maintenance equipment. Specifically, the City entered into an
Agreement with the Escalon Unified School District on May 16, 200 which included
agreements relates to the design and construction of Pool Facilities, administration,
construction of restroom facilities, and joint-use of Pool Facilities.
Expenditure reductions are being pursued through coordination with other agencies
which could provide the elimination of service duplication and/or economies of scale
in purchasing. The City has an ongoing partnership with three other cities and the
South San Joaquin Irrigation District to construct a South County Water Treatment
Plant and share the resulting water supply.
7.1 DETERMINATION
Escalon has multiple processes in place to assess whether levels of service provided
are adequate to accommodate new growth, including the City's General Plan, its
annual budgeting process, and master planning process for water supply and
distribution, wastewater systems, storm water systems as well as law enforcement
75
services. It is through these processes that the City will continue to monitor and assess
whether future opportunities for shared facilities will improve levels of service in a cost
effective manner.
76
8 ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS, INCLUDING
GOVERNMENTAL STRUCTURE AND OPERATIONAL EFFICIENCIES
The following section reviews the City's accountability for community services and
how those services are provided. It also looks at the City's government structure and
its operational efficiencies.
8.1 ACCOUNTABILITY FOR COMMUNITY SERVICE NEEDS
Escalon is a general law City operating under a council-City manager form of
government. This general law format allows for citizens to elect a governing body
that will set policy, pass ordinances and resolutions and approve fiscal spending.
Municipal elections are held on the first Tuesday in November of even numbered
years. Members of the City Council are elected at large for a four-year term on an
overlapping basis. Two are elected during one election and three are elected two
years later. The Mayor and Vice Mayor are elected by the Council for two-year terms.
The City Council convenes regular meetings on the 1st and 3rd Mondays of each
month at 7:00 pm at Escalon City Hall located at 2060 McHenry Avenue. The public
also has access to City Council members through email links on the City's web site
(www.
Cityofescalon.orq/qovernment /contact-us).
The Planning Commission consists of five members, appointed by the City Council
members and are seated for four-year terms of office. The Planning Commission acts
on all applications for use permits, parcel maps, variances, design review, site plan
review, and makes recommendations to the City Council on applications for
tentative subdivision maps, and amendments to the zoning ordinance and to the City
General Plan. The Planning Commission can also initiate such amendments and
provides advice to the Council on special projects. The Planning Commission
convenes regular meetings on the 2nd Tuesday, following the 1st Monday of each
month at 6:30 pm at the City Council Chambers at 2060 McHenry Avenue.
The Recreation Commission consists of five members, appointed by the City Council
and are seated for three-year terms of office. The Recreation Commission provides
advice and community perspectives regarding recreation services and programming
for the residents and assist in the organization of recreation programs both by policy
and participation within the programs by being an active volunteer/member. The
Recreation Commission convenes regular meetings at 6:30 pm on the first Wednesday
of each month at the City Council Chambers at 2060 McHenry Avenue.
The City Hall building is located at 2060 McHenry Avenue and is open to the public
from 8am to 5pm, Monday through Thursday, closed daily from 12-1 pm for lunch. City
Hall is closed every Friday.
The City provides its residents with information on City policy and upcoming
opportunities for public involvement through its website and through a City newsletter
mailed to all residents bi-monthly. In addition, residents are notified as required by
77
law for public hearings. The Escalon Times also provides information to the community
regarding City activities.
The City prepares annual reports as required by State and Federal regulations. These
include annual reports on General Plan implementation progress, water quality,
growth for the Department of Finance, and Community Development Block Grant
(CDBG) implementation. These reports are available to the public for review and
comment.
8.2 DETERMINATION
The City has established a good system of accountability which adequately serves
the residents of Escalon.
The City of Escalon is responsible for governance within its incorporated boundaries.
Actions of the City Council, including opportunities for public involvement and public
hearing, are regulated in accordance with the Brown Act (California Government
Code Section 54950 et seq.) other applicable statues and regulations, and City
procedures.
The residents of Escalon are offered a wide range of opportunities to oversee the
activities of elected, appointed and paid representatives responsible for the provision
of public services to the community through elections, publicized meetings and
hearings, as well as through the reports completed in compliance with State and
Federal reporting requirements.
GOVERNMENT STRUCTURE OPTIONS
8.3
Residents ultimately have oversight for the provision of public services in Escalon since
the City is run by an elected City Council that answers to the public through the ballot
process.
When Escalon annexes property from the SOI into the City, the City will provide a wide
range of public services (police, water, sewer and storm drainage). In most cases
annexation will result in the availability of services that were not previously available
for the property outside the City's limit. The newly annexed properties will be provided
a higher level of service but will also encounter a corresponding increase in service
fees to pay for the additional services.
DETERMINATION
8.4
Escalon's government structure is adequate and meets the needs of the residents.
Since Escalon is an incorporated City, the City Council will make the final decisions
concerning fee structures and the provisions of services. As discussed in previous
chapters, the City of Escalon and the Escalon FD should both review their fee
structures every 5 years and index the fees on an annual basis so they ensure the funds
they are collecting are adequate to meet the needs of a growing City. The City's
General Plan also has goals, objectives, policies and actions to ensure that adequate
services are provided in a cost-effective manner to accommodate new growth.
78
8.5 EVALUATION OF MANAGEMENT EFFICIENCIES
Escalon provides a wide range of public services to its residents and businesses
through the collection of developer fees. user fees and taxes, as well as grants and
other State and Federal funding. As previously mentioned. the City directly provides
potable water. wastewater and storm water collection and disposal, law
enforcement services as well as general planning and maintenance for the
community.
The City undertakes long-range planning programs to better plan and budget for
needed improvements to services and facilities. The City completed an update to its
General Plan in 2019. this update identified how the City plans to grow and areas for
potential for growth for 50 years. The General Plan growth projections provided a
baseline for other planning documents. such as the water. sewer and storm master
plans. which allows the City to better estimate future demand for services and
improvements needed to meet this demand.
Using these long-range plans as a basis. the City utilizes an annual budgeting process
to balance expenditures for provision of needed services with anticipated income.
During this process the City analyzes the need for City staffing. equipment and
facilities for the following year. The Department Heads are encouraged to continually
explore methods to minimize the cost for services while maintaining a high level of
service. The City's practice is to be conservative in their revenue projections as well
as in their expenditure projections. The City is careful to review the previous year's
revenue and expenditures as well as the historical trends when developing the annual
budget. The City has been able to balance if not incur a budget surplus for the past
few years.
8.6 DETERMINATION
The City's current growth management process is adequate and meets the needs of
the City.
The City will continue to use the budget and long-range planning processes to ensure
that it is able to provide direct and adequate levels of service in a cost-effective
manner within its service area.
79
9 REFERENCES
DOCUMENTATION
Eastern San Joaquin Groundwater Authority, Groundwater Sustainability Plan. November 2019
and revised June 2022.
Escalon General Pion. Quad Knopf, June 6, 2005.
Escalon General Pion Update Administrative Draft Background Report, Quad Knopf, February
2004
General Plan Update 2005-2035 Draft Environmental Impact Report. City of Escalon, Quad
Knopf. February 2005.
Escalon General Plan Update, Quad Knopf, December 2, 2019.
Escalon Environmental Justice White Paper, DeNovo Planning Group, 2019.
City of Escalon, 2021 Consumer Confidence Report, January 2022
City of Escalon Water Master Plan, Eco:Logic, January 2007
City of Escalon Water System Evaluation, Blackwater Consulting Engineers, Inc., February 2016.
City of Escalon Sewer Master Plan. Eco:Logic. January 2007
Phase land 2 Sewer Constraints Report, West Yost, May 2014.
Preliminary WWTP Master Plan V3.0, PACE Advanced Water Engineering, November 4, 2019.
City of Escalon Draft Storm Drain Master Plan, Eco:Logic Engineering and Kjeldsen, Sinnock &
Neudeck, Inc. January 2007
Development Impact Fee Justification Study, City of Escalon. David Taussig & Associates, Inc.,
December 16. 2016.
Housing Element for the City of Escalon. DeNovo Planning Group, December 2, 2019.
Policy Link, California Unincorporated: Mapping Disadvantaged Communities in the San
Joaquin Valley, 2013
U.S. Census Bureau, 2015-2019 American Community Survey 5-Year Estimates
U.S. Census Bureau, 2016-2020 American Community Survey 5-year Estimates
U.S. Census Bureau, 2000 Summary File 3 and 4
WEBSITES
www.Cityofescalon.org/index.htm. City of Escalon
http://www.escalonfire.com/index.html. Escalon Fire Protection District
80