LAFCO
CSA 9 Public Works
Read the report at Local Agency Formation Commissions ↗
County Service Area 9
Service and Sphere of Influence Review
Adopted Version (March 5, 2025)
Local Agency Formation Commission of Santa Cruz County
701 Ocean Street, Room 318-D Santa Cruz, CA 95060
Website: www.santacruzlafco.org
Phone: (831) 454-2055
Table of Contents
EXECUTIVE SUMMARY ................................................................................................. 3
Introduction .................................................................................................................. 3
Structure of Report ...................................................................................................... 3
Grand Jury Request ..................................................................................................... 3
Legal Authority ............................................................................................................. 4
Service Provision ......................................................................................................... 5
Sphere of Influence ...................................................................................................... 8
Key Findings ................................................................................................................ 9
Recommended Actions .............................................................................................. 10
COUNTY SERVICE AREA 9 ......................................................................................... 11
District Overview ........................................................................................................ 11
Finances .................................................................................................................... 13
Governance ............................................................................................................... 16
Opportunities & Challenges ....................................................................................... 19
Sphere of Influence .................................................................................................... 20
CSA Summary ........................................................................................................... 22
Service & Sphere Determinations .............................................................................. 23
CSA 9 (Zone A) ............................................................................................................. 25
Zone Overview .......................................................................................................... 25
Finances .................................................................................................................... 27
Zone Summary .......................................................................................................... 30
CSA 9 (Zone B) ............................................................................................................. 31
Zone Overview .......................................................................................................... 31
Finances .................................................................................................................... 33
Zone Summary .......................................................................................................... 36
CSA 9 (Zone C) ............................................................................................................. 37
Zone Overview .......................................................................................................... 37
Finances .................................................................................................................... 39
Zone Summary .......................................................................................................... 43
County Service Area 9 Service & Sphere Review Page 1 of 60
CSA 9 (Zone D) ............................................................................................................. 44
Zone Overview .......................................................................................................... 44
Finances .................................................................................................................... 46
Zone Summary .......................................................................................................... 49
CSA 9 (Zone E) ............................................................................................................. 50
Zone Overview .......................................................................................................... 50
Finances .................................................................................................................... 52
Zone Summary .......................................................................................................... 54
CSA 9 (Zone F) ............................................................................................................. 55
Zone Overview .......................................................................................................... 55
Finances .................................................................................................................... 57
Zone Summary .......................................................................................................... 59
APPENDICES ............................................................................................................... 60
Appendix 1: LAFCO Comment Letter to Grand Jury (August 8, 2024) ...................... 60
Appendix 2: CSA 9 Formation Resolution ................................................................. 60
Appendix 3: Countywide Capital Improvement Plan (2020 - 2025) ........................... 60
Appendix 4: Zone A Formation Resolution ................................................................ 60
Appendix 5: Zone B Formation Resolution ................................................................ 60
Appendix 6: Zone C Formation Resolution ................................................................ 60
Appendix 7: Zone D Formation Resolution ................................................................ 60
Appendix 8: Zone E Formation Resolution ................................................................ 60
Appendix 9: Zone F Formation Resolution ................................................................ 60
County Service Area 9 Service & Sphere Review Page 2 of 60
EXECUTIVE SUMMARY
Introduction
This Service and Sphere of Influence Review provides information about the services and
boundaries regarding County Service Area 9 ( “CSA 9”). The report will be used by the
Local Agency Formation Commission (LAFCO) to conduct a statutorily required review
and update process. The Cortese-Knox-Hertzberg Act requires that LAFCO conduct
periodic reviews and updates of Spheres of Influence for all cities and special districts in
Santa Cruz County (Government Code Section 56425). It also requires LAFCO to
conduct a review of municipal services before adopting sphere updates (Government
Code Section 56430). The last service review for CSA 9 was adopted on August 5, 2020.
The service review process does not require LAFCO to initiate changes of organization
based on service review conclusions or findings; it only requires that LAFCO make
determinations regarding the delivery of public services in accordance with Government
Code Section 56430. However, LAFCO, local agencies, and the public may subsequently
use the determinations and related analysis to consider whether to pursue changes in
service delivery, government organization, or spheres of influence.
Service and sphere reviews are informational documents and are generally exempt from
environmental review. LAFCO staff has conducted an environmental review of the
Districts’ existing spheres of influence pursuant to the California Environmental Quality
Act (CEQA) and determined that this report is exempt from CEQA. Such exemption is
due to the fact that it can be seen with certainty that there is no possibility that the activity
in question may have a significant effect on the environment (Section 15061[b][3]).
Structure of Report
This Executive Summary presents a brief overview of the service review, key findings,
and recommended actions. The Profile Chapters contain individual evaluations of CSA
9 and its six zones of benefit - highlighting specific characteristics, ongoing operations,
current fiscal health, ability to provide services, and its importance within its jurisdictional
area.
The CSA 9 profile chapter includes statutory determinations required for all service and
sphere of influence reviews pursuant to the Cortese-Knox-Hertzberg Act. Appendices
with sources used to conduct the service review concludes the report.
Grand Jury Request
The Civil Grand Jury is part of the judicial branch of local government. Consisting of Santa
Cruz County citizens, it is both an arm of the court and an entirely independent body. The
primary function of the Civil Grand Jury is to examine all aspects of local governments
(ex. the County, cities, special districts and joint power authorities) to see that the public
monies are being handled judiciously and that all accounts are properly audited. This goal
is accomplished by developing several reports on an annual basis. In 2024, the Grand
Jury published a report titled “Santa Cruz County Local Roads: A smooth path through
paradise or a hell of a road” which focused on the current road conditions in
unincorporated Santa Cruz County. The Grand Jury has asked LAFCO to provide
County Service Area 9 Service & Sphere Review Page 3 of 60
comments on this report, which was completed on August 8, 2024. In addition, the Grand
Jury requested that LAFCO issue a new service and sphere review for CSA 9 with
detailed data for Zone D by March 15, 2025. The service review for CSA 9 was initially
scheduled for publication in August 2025 but was moved to March to accommodate the
Grand Jury’s request. This service review fulfills the request from the Grand Jury.
Legal Authority
CSA 9 is governed by the County Service Area Law (Government Code Section 25210
et seq.). The Legislature finds and declares all of the following:
a) Population growth and development in unincorporated areas result in new and
increased demands for public facilities and services that promote the public peace,
health, safety, and general welfare.
b) The residents and property owners in unincorporated areas should have reasonable
methods available so that they can finance and provide these needed public facilities
and services.
c) The residents and property owners in some unincorporated areas may propose the
incorporation of new cities or annexations to existing cities as a way to fulfill these
demands for public facilities and services.
d) In other unincorporated areas, independent special districts with directly elected or
appointed governing boards can fulfill these demands for public facilities and services.
e) County boards of supervisors need alternative organizations and methods to finance
and provide needed public facilities and services to the residents and property owners
of unincorporated areas.
f) In enacting the County Service Area Law by this chapter, it is the intent of the
Legislature to continue a broad statutory authority for county boards of supervisors to
use county service areas as a method to finance and provide needed public facilities
and services.
g) Further, it is the intent of the Legislature that county boards of supervisors, residents,
and property owners use the powers and procedures provided by the County Service
Area Law to meet the diversity of local conditions, circumstances, and resources.
CSA Zones of Benefit
State law indicates that LAFCOs have purview over cities and special districts, including
county services areas. However, in accordance with Government Code Section
56036(b)(10), LAFCOs do not have authority over a zone of any special district. This
service review is intended to provide information about CSA 9 and its zones, with the
understanding that boundary changes to Zones A-F can only occur from actions taken by
the County.
County Service Area 9 Service & Sphere Review Page 4 of 60
Service Provision
CSA 9 was formed on October 16, 1968 to provide public works services to the
unincorporated county area and the City of Scotts Valley. Originally, CSA 9 provided
county highway and arterial street lighting and traffic signal service to the unincorporated
areas. Subsequently, additional zones have been established to fully or partially finance
other services not provided uniformly countywide to all incorporated and unincorporated
areas of Santa Cruz County. The zones include:
Table 1: CSA 9 Zones (6 in total)
CSA 9 Zones Services Location
Specific unincorporated
Zone A Street Lighting residential and commercial
areas throughout the County
School Crossing Live Oak Elementary School
Zone B
Guard Program District
City of Scotts Valley and the
Landfill and
Zone C entire unincorporated
Resource Recovery
County area
Three sub-zones
Zone D Road Maintenance
(North, Central, and South)
Street and Former Live Oak/Soquel
Zone E
Landscaping Maintenance Redevelopment Area
Public Parking and
Zone F Soquel Village
Landscaping Maintenance
County Service Area 9 Service & Sphere Review Page 5 of 60
Population & Growth
The Association of Monterey Bay Area Governments (AMBAG) indicates that the
unincorporated areas within Santa Cruz County will experience a slow growth over the
next fifteen years. The 2018 AMBAG Regional Growth Forecast Report states that the
population in unincorporated territory will grow at a rate of approximately 1% every five
years. Based on this anticipated growth rate, LAFCO staff calculated the estimated
population for CSA 9 and its zones from 2020 to 2040, as shown below:
Table 2: Population Estimates
2020 2025 2030 2035 2040
CSA 9 149,036 150,110 151,387 152,704 154,063
CSA 9 (Zone A) 56,107 56,668 57,234 57,807 58,385
CSA 9 (Zone B) 23,678 23,915 24,154 24,396 24,640
CSA 9 (Zone C) 149,036 150,110 151,387 152,704 154,063
CSA 9 (Zone D) 136,566 137,932 139,311 140,704 142,111
CSA 9 (Zone E) 35,409 35,763 36,120 36,481 36,846
CSA 9 (Zone F) 19 19 20 20 20
Funding Source
County Public Work services are primarily funded through assessments. The following
table summarizes the current annual service rates. A full review of all charges for services
is discussed in the Profile Chapters within the report.
Table 3: Annual Service Rates by Parcels (FY 2024-25 Data)
Improved Vacant Single Multi Mobile Commercial School/Church/
Land Land Family Family/Unit Home Use Agriculture
CSA 9 $16.60 $8.30 - - - - -
Zone A - $2.35 $4.70 $2.82 $2.82 $4.70 -
Zone B Funded by Property Taxes
Zone C - $113.90 $56.94 $28.48 - $113.90 $113.90
Zone D $56.40 $28.20 - - - - -
Zone E - $1.54 $3.08 $1.85 - $1.85-$3.08 -
Zone F Funded by Licenses, Permits, and Franchises
Footnote: The existing assessments have remained the same for the past decade (FY 15-16 to FY 24-25).
County Service Area 9 Service & Sphere Review Page 6 of 60
Financial Health
CSA 9 and its six zones are primarily funded through benefit assessments. Table 4
highlights whether CSA 9 and its zones had enough revenue to cover annual expenses
for FY 2023-24. A full review of all revenue funds for each zone during the past six years
is discussed in the Profile Chapters within this report.
Table 4: Total Revenue vs. Total Expense (FY 2023-24)
CSA 9 (Six Zones) Total Revenue Total Expense Surplus/(Deficit)
CSA 9 $1,227,171 $1,322,758 -$95,587
Zone A $887,507 $406,682 $480,825
Zone B $30,185 $13,750 $16,435
Zone C $27,632,969 $22,877,516 $4,755,453
Zone D $2,601,835 $2,602,323 -$488
Zone E $38,755 $27,775 $10,980
Zone F Inactive zone since FY 2022-23
Footnote: Surplus/(Deficit) amounts are before any year-end adjustments
Proposition 218 Limitations
Prop 218 was approved by the state’s voters in November 1996 and applied to each of
California’s nearly 7,000 cities, counties, special districts, schools, community college
districts, redevelopment agencies, and regional organizations. The intent of Prop 218 was
to ensure that all taxes and most charges on property owners are subject to voter
approval. In addition, Prop 218 attempted to curb some perceived abuses in the use of
assessments and property-related fees, specifically the use of these revenue-raising tools
to pay for general governmental services rather than property-related services.
Since CSA 9 and most of its zones predate Prop 218, including but not limited to Zone D,
there is a concern that increasing the current Charges for Services, and subjecting the
CSA to Prop 218, could risk the electorate eliminating the CSA altogether. Additionally, a
Prop 218 assessment requires a local agency to demonstrate that assessed properties
receive special benefit and that the amount of an assessment is proportional to, and no
greater than, the special benefit conferred. A CSA zone may be funded by an
assessment. The assessment for a CSA zone can only recover the capital cost of a public
improvement, the maintenance and operation expenses of a public improvement, or the
cost of the service that is being funded by the assessment revenues. Only special benefits
are assessable; thus, Proposition 218 requires local governments to:
• Identify all parcels that will receive a special benefit;
• Determine the proportionate special benefit derived by each parcel; and
• Separately identify any general benefits.
The assessed parcels must receive a “special benefit” from the public improvement or
service that is distinct from the benefit to the general public. Proposition 218 defines
“special benefit” as “a particular and distinct benefit over and above general benefits
conferred on real property located in the district or to the public at large. General
enhancement of property value does not constitute ‘special benefit.’” A local government’s
assessment power cannot be used for general benefit services.
County Service Area 9 Service & Sphere Review Page 7 of 60
Disadvantaged Unincorporated Communities
State law requires LAFCO to identify and describe all “disadvantaged unincorporated
communities” (DUCs) located within or contiguous to the existing spheres of influence of
cities and special districts that provide fire protection, sewer, and/or water services. DUCs
are defined as inhabited unincorporated areas with an annual median household income
that is 80% or less than the statewide annual median household income.
In 2020, the California statewide annual median household income was $78,672, and
80% of that was $62,938. LAFCO staff utilized the ArcGIS mapping program to locate
potential DUCs in Santa Cruz County. It is important to note that CSA 9 and its six zones
are not subject to SB 244 because it does not provide water, sewer, or fire service, and
therefore, no further analysis is required.
Sphere of Influence
City and special district spheres of influence define the probable physical boundaries and
service area of a local agency, as determined by the Commission (Government Code
Section 56076). The law requires that spheres be updated at least once every five years,
either concurrently or subsequently to the preparation of Municipal Service Reviews.
Spheres are determined and amended solely at the discretion of the Commission. In
determining the sphere of influence for each local agency, the Commission is required by
Government Code Section 56425(e) to consider certain factors, including:
❖ The present and planned uses in the area, including agricultural and open-space
lands;
❖ The present and probable need for public facilities and services in the area;
❖ The present capacity of public facilities and adequacy of public services that the
agency provides or is authorized to provide;
❖ The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency; and
❖ An update on a sphere of influence for a city or special district that provides public
facilities or services related to sewers, municipal and industrial water, or structural fire
protection, that occurs pursuant to subdivision (g) on or after July 1, 2012, the present
and probable need for those public facilities and services of any disadvantaged
unincorporated communities within the existing sphere of influence.
Santa Cruz LAFCO adopted the first sphere of influence for CSA 9 on November 20,
1985. The CSA's sphere of influence covers the entire County of Santa Cruz, including
the four cities. Figure 1 on page 12 shows the current service and sphere boundary for
CSA 9. LAFCO staff is recommending that the sphere for CSA 9 be reaffirmed with the
condition that the County complete the following by March 2030:
1) Identify capital improvement projects or potential infrastructure repairs for CSA 9 and
all zones; and
2) Conduct an analysis to determine when and how should existing benefit assessments
for CSA 9 and its zones need to be increased in order to raise adequate funding for
the scheduled future improvements.
County Service Area 9 Service & Sphere Review Page 8 of 60
Key Findings
The following are key findings of the 2025 Service and Sphere Review for CSA 9:
1. The CSA provides services in sub-areas within the county.
CSA 9 was formed in October 1968 to provide public works services to areas
throughout the entire county. Since then, the Public Works Department has created
six different zones to offer further services to communities, including but not limited to
streetlighting, road maintenance, and landfill services. While LAFCOs do not have
authority over a zone, it is important to evaluate the operations and financial health of
these zones to fully understand the opportunities and challenges facing CSA 9.
2. The CSA continues to face financial constraints.
CSA 9’s primary source of revenue is from charges for services, also referred to as
benefit assessments. Based on LAFCO’s analysis, CSA 9 has experienced a deficit
in four of its last five fiscal years (FY 19-20 to FY 2023-24). Additionally, the six zones
have also experienced their own annual deficits. LAFCO has determined that these
shortfalls may be attributed to the existing benefit assessment that has not been
adjusted accordingly. In other words, the benefit assessments for CSA 9 and its zones
have not changed in the past decade. In some cases, assessments for certain CSA 9
zones have remained the same since their original adoption.
3. The CSA has a few capital improvement projects scheduled for the next 5 years.
The County adopted a five-year capital improvement plan on June 2, 2020. The
purpose of this plan was to identify and prioritize needs and project costs for planned
improvements to the infrastructure serving affected ratepayers in an efficient and
cost-effective manner throughout the next five-plus years of growth and change. A
total of five capital improvement projects relating to CSA 9 were scheduled to be
completed during FY 2020-21 to FY 2024-25. However, these projects only involve
CSA 9 and Zone C. All other zones did not have any scheduled improvement projects.
4. CSA 9 requires improvement in governmental transparency.
State law now requires all independent special districts to maintain and operate a
website by January 1, 2020. CSA 9 is a dependent special district, and therefore, not
subject to this statutory requirement. However, LAFCO encourages the County to offer
more information about CSA 9 on their website to ensure residents have the
opportunity to participate in the CSA’s decision-making process and future actions.
This is important since CSA 9 and its zones provide various services with different
benefit assessments throughout the county – without accessible information, it may
be difficult for the public and constituents to understand the purpose of CSA 9 and the
distinguished zones.
5. The CSA currently has a countywide sphere.
Santa Cruz LAFCO designated the first sphere of influence for CSA 9 in November
1985. The CSA's sphere of influence is the entire County of Santa Cruz, including all
unincorporated and incorporated areas. The sphere boundary has remained
unchanged since its original adoption. Spheres of influence are not required to be
adopted for zones within a county service area. Staff is recommending that the sphere
for CSA 9 be reaffirmed with several conditions. These conditions are explained in the
recommended actions section of the service and sphere review.
County Service Area 9 Service & Sphere Review Page 9 of 60
Recommended Actions
Based on the analysis and findings in the 2025 Service and Sphere of Influence Review
for County Service Area 9, the Executive Officer recommends that the Commission:
1. Find that pursuant to Section 15061(b)(3) of the State CEQA Guidelines, LAFCO
determined that the sphere of influence review is not subject to the environmental
impact evaluation process because it can be seen with certainty that there is no
possibility the activity in question may have a significant effect on the environment and
the activity is not subject to CEQA;
2. Determine, pursuant to Government Code Section 56425, the Local Agency
Formation Commission of Santa Cruz County is required to develop and determine a
sphere of influence for County Service Area 9, and review and update, as necessary;
3. Determine, pursuant to Government Code Section 56430, the Local Agency
Formation Commission of Santa Cruz County is required to conduct a service review
before, or in conjunction with an action to establish or update a sphere of influence;
and
4. Adopt a Resolution (LAFCO No. 2025-01) approving the 2025 Service and Sphere of
Influence Review for County Service Area 9 with the following conditions:
a. Reaffirm the sphere boundary for CSA 9 with the condition that the County
complete the following actions by March 2030: (1) create a plan identifying the
capital improvement projects or potential infrastructure repairs for CSA 9 and all
its zones, and (2) conduct an analysis to determine when and how existing benefit
assessments for CSA 9 and its zones should be increased in order to raise
adequate funding for scheduled and future improvements;
b. Present a status update to the Commission on CSA 9’s capital improvement plan
and benefit assessment analysis on March 4, 2026;
c. Consider the dissolution of Zone F due to inactivity. The dissolution of a zone of
benefit does not require LAFCO action, but rather, an adoption of a resolution by
the County Board of Supervisors; and
d. Direct the Executive Officer to distribute a copy of the adopted service and sphere
review to CSA 9 representatives and any other interested or affected parties,
including but not limited to the County Public Works Department, the County
Administrative Office, and the four cities (Capitola, Santa Cruz, Scotts Valley, and
Watsonville).
County Service Area 9 Service & Sphere Review Page 10 of 60
COUNTY SERVICE AREA 9
District Overview
County Service Area 9 was formed on October 16, 1968 to provide public works services
to the unincorporated areas in Santa Cruz County. Originally, CSA 9 provided County
highway and arterial street lighting and traffic signal service in the unincorporated areas.
CSA 9’s service area includes the City of Scotts Valley and the entire unincorporated area
in Santa Cruz County. Additional zones have been created to fully or partially finance
other services not provided uniformly countywide to all incorporated and unincorporated
areas of the county. For purposes of this report, the six zones are analyzed separately.
This chapter will focus on CSA 9 and its designated services. Appendix 1 provides a
copy of CSA 9’s 1968 formation resolution.
Population & Growth
Official growth projections are not available for CSA 9. In general, unincorporated areas
in Santa Cruz County are projected to have slow growth over the next fifteen years. Based
on the Association of Monterey Bay Area Government’s 2018 Regional Growth Forecast
Report, the current population in unincorporated Santa Cruz County and Scotts Valley
are approximately 138,000 and 12,000, respectively. Under this slow growth model,
LAFCO staff projects that CSA 9’s entire population in 2040 will be approximately
154,000. The projected population growth for CSA 9 are as follows:
Table 5: Projected Population
2020 2025 2030 2035 2040
Santa Cruz County
136,891 137,896 139,105 140,356 141,645
(unincorporated area)
City of Scotts Valley 12,145 12,214 12,282 12,348 12,418
County Service Area 9 149,036 150,110 151,387 152,704 154,063
Source: AMBAG 2018 Regional Growth Forecast
Services & Operations
CSA 9 provides highway (ex. Highway 9) and arterial street (ex. Soquel Drive) lighting
and traffic signal service countywide, excluding the Cities of Capitola, Santa Cruz, and
Watsonville. Figure 1, on page 12, provides a map of the CSA. Currently, there are 480
highway lighting, 180 arterial street lighting, and 47 traffic signals managed and operated
by the County under CSA 9.
County Service Area 9 Service & Sphere Review Page 11 of 60
Figure 1: CSA 9 Vicinity Map
County Service Area 9 Service & Sphere Review Page 12 of 60
Finances
This section will highlight the District’s audited financial performance during the most
recent fiscal years. Fiscal Year 2023-24 is the latest audited financial statement available.
A comprehensive analysis of the District’s financial performance during the past five
years, including the latest adopted budget, is shown in Table 7, on page 15.
At the end of Fiscal Year 2023-24, total revenue collected was approximately $1.23
million, representing a 1.15% increase from the previous year ($1.21 million in FY 22-23).
Total expenses for FY 2023-24 were approximately $1.32 million, which increased from
the previous year by 5.28% ($1.26 million in FY 22-23). As shown in the figure below,
CSA 9 has ended the fiscal year in a deficit four times since FY 2019-20. Based on the
most recently available adopted budget, LAFCO staff believes this negative trend will
continue.
Figure 2: Statement of Revenues & Expenditures
$1,350,000
$1,322,758
$1,300,000
$1,256,439
$1,250,000 $1,246,356 $1,244,001
$1,232,745
$1,227,171
$1,224,234
$1,213,169
$1,200,000
$1,173,035 $1,171,264
$1,156,774
$1,150,000
$1,111,305
$1,100,000
$1,050,000
$1,000,000
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
TOTAL REVENUE TOTAL EXPENDITURE
County Service Area 9 Service & Sphere Review Page 13 of 60
Revenue
CSA 9’s primary source of revenue is from Charges for Services. In FY 2023-24, Charges
for Services totaled approximately $777,000, which represents 63% of the CSA’s entire
revenue stream. Other revenue sources include Property Taxes ($424,652),
Miscellaneous ($21,976), Use of Money and Property ($571), and Intergovernmental
Funds ($2,635). Figure 3 provides a breakdown for each revenue stream.
Figure 2: Total Revenue (FY 2023-24)
Taxes
$424,652 (35.24%)
Use of Money & …
Intergovernmental
$2,635 (0.22%)
Charges for Services
$777,337 (64.50%)
Charges for Services
Pursuant to Santa Cruz County Code Section 4.26, the Director of Public Works shall
annually compute the benefit assessment/service charge rates for all CSAs and submit a
report to the Board of Supervisors describing each parcel of real property receiving the
special benefit and the amount of the benefit assessment for each parcel for the
forthcoming fiscal year. Table 6 shows the adopted assessments for CSA 9 for the past
decade. As shown below, the charges for services have remained unchanged since 2015.
Table 6: Charges for Services
FY 2015-16 to FY 2023-24 FY 2024-25
Parcel
(Actual) (Adopted)
Improved $16.60 $16.60
Unimproved $8.30 $8.30
Based on staff’s analysis, benefit assessments have never been increased. The County
Board of Supervisors adopted the same benefit assessment levels for FY 2024-25 on
May 14, 2024. Increasing the benefit assessment rates may help address the anticipated
deficit for FY 2024-25 and future budgets.
Expenditure
CSA 9’s total expenditures can be categorized into two budgetary groups: Services and
Supplies and Fixed Assets. However, in FY 2023-24, Services and Supplies represented
100% of the CSA’s entire operational expenses. Table F on page 15 provides an overview
of all revenues and expenditures from FY 2019-20 to FY 2024-25.
County Service Area 9 Service & Sphere Review Page 14 of 60
Table 7: Total Revenues & Expenditures
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Taxes
Property Tax - Current Secured-Gen $ 311,701 $ 326,582 $ 338,940 $ 363,764 $ 382,639 $ 364,417
Residual Distribution $ 3 3,520 $ 2 3,846 $ 2 0,606 $ 2 8,331 $ 2 7,000 $ 1 7,426
Property Tax - Current Unsecured-Gen $ 6 ,154 $ 5 ,592 $ 6 ,324 $ 6 ,749 $ 7 ,639 $ 1 3,358
Property Tax - Prior Unsecured-Gen $ 6 19 $ 1 ,172 $ 7 27 $ 6 72 $ 9 04 $ 9 56
Penalties for Deliquent Taxes $ 6 0 $ 5 1 $ 2 2 $ 7 0 $ 8 2 $ 1 03
Redemption Penalties for Deliquent Taxes $ 5 6 $ 8 4 $ 4 1 $ 5 9 $ 8 1 $ 6 3
Supplemental Property Tax - Current Secured $ 6 ,175 $ 3 ,990 $ 1 1,815 $ 1 1,314 $ 4 ,898 $ 9 ,131
Supplemental Property Tax - Current Unsecured$ 8 1 $ 1 76 $ 1 46 $ 4 83 $ 3 59 $ 4 45
Supplemental Property Tax - Prior Secured $ 4 43 $ 4 71 $ 1 91 $ 6 44 $ 7 54 $ 1 ,024
Supplemental Property Tax - Prior Unsecured $ 1 80 $ 7 2 $ 8 3 $ 1 27 $ 2 26 $ 1 36
In-Lieu Taxes Other $ 1 10 $ 1 05 $ 8 5 $ 6 7 $ 7 0 $ -
Total Taxes $ 359,099 $ 362,141 $ 378,980 $ 412,280 $ 424,652 $ 407,059
Revenue from Use of Money & Property
Interest $ 3 ,573 $ 7 22 $ 7 37 $ 2 ,391 $ 5 71 $ 1 ,309
Total Revenue from Use of Money & Property $ 3 ,573 $ 7 22 $ 7 37 $ 2 ,391 $ 5 71 $ 1 ,309
Intergovernmental Revenues
St-Homeowners' Property Tax Relief $ 1 ,778 $ 1 ,764 $ 1 ,740 $ 1 ,767 $ 1 ,839 $ 1 ,767
St-Other Tax Relief Subventions $ 1 43 $ 2 28 $ 2 59 $ 1 87 $ 2 24 $ 2 92
Fed-Hazard Elimination Safety $ - $ - $ - $ - $ - $ -
Contribution From Other Government Agencies$ - $ - $ - $ - $ - $ -
St-Other $ - $ - $ - $ - $ - $ -
RDA Pass-Throughs $ 6 83 $ 625 $ 1,127 $ 1 ,015 $ 5 72 $ 9 48
Total Intergovernmental Revenues $ 2 ,604 $ 2 ,617 $ 3 ,126 $ 2 ,969 $ 2 ,635 $ 3 ,007
Charges for Services
Other Road & Street Services $ 783,299 $ 779,955 $ 778,404 $ 778,240 $ 777,337 $ 778,281
Total Charges for Services $ 783,299 $ 779,955 $ 778,404 $ 778,240 $ 777,337 $ 778,281
Miscellaneous Revenues
Other Revenue $ 8 ,199 $ 2 7,600 $ 1 0,017 $ 1 7,289 $ 2 1,976 $ 3 4,578
Total Misc. Revenues $ 8 ,199 $ 2 7,600 $ 1 0,017 $ 1 7,289 $ 2 1,976 $ 3 4,578
TOTAL REVENUE $ 1 ,156,774 $ 1 ,173,035 $ 1 ,171,264 $ 1 ,213,169 $ 1 ,227,171 $ 1,224,234
EXPENDITURE
Services and Supplies
DPW Services-General Money $ 1 ,069,036 $ 1 ,003,735 $ 1 ,153,529 $ 1 ,213,452 $ 1 ,325,586 $ 1,222,745
Total Services and Supplies $ 1 ,069,036 $ 1 ,003,735 $ 1 ,153,529 $ 1 ,213,452 $ 1 ,325,586 $ 1 ,222,745
Fixed Assets
Building and Improvements $ 177,320 $ 107,570 $ 9 0,472 $ 4 2,987 $ (2,828) $ 1 0,000
Total Fixed Assets $ 177,320 $ 107,570 $ 9 0,472 $ 4 2,987 $ (2,828) $ 1 0,000
Other Financing Uses
Operating Transfers Out $ - $ - $ - $ - $ - $ -
Total Other Financing Uses $ - $ - $ - $ - $ - $ -
TOTAL EXPENDITURE $ 1 ,246,356 $ 1 ,111,305 $ 1 ,244,001 $ 1 ,256,439 $ 1 ,322,758 $ 1,232,745
Surplus/(Deficit) $ ( 89,582) $ 6 1,730 $ ( 72,737) $ ( 43,270) $ ( 95,587) $ (8,511)
County Service Area 9 Service & Sphere Review Page 15 of 60
Governance
CSA 9 is a dependent special district governed by the County Board of Supervisors. All
CSAs are formed and operate pursuant to the County Service Area Law (Government
Code Section 25210 et seq.). County Supervisors receive no additional compensation for
their CSA responsibilities. Santa Cruz County staff from the Public Works Department
manages the services related to CSA 9.
Local Accountability & Structure
The current Board is as follows:
Table 8: Board of Directors
Board Member Supervisorial District Term of Office
First District
(Live Oak, Soquel, Summit,
First Elected: 2020
Manu Koenig Santa Cruz Gardens,
Next Election: Primary 2028
Carbonera, and parts of
Scotts Valley & Capitola)
Second District
(Aptos, Freedom, Corralitos, First Elected: 2024
Kimberly De Serpa
La Selva Beach, and parts of Next Election: Primary 2028
Capitola & Watsonville)
Third District
First Elected: 2022
Justin Cummings (Santa Cruz, Bonny Doon,
Next Election: Primary 2026
North Coast)
Fourth District First Elected: 2022
Felipe Hernandez
(Pajaro Valley, Watsonville) Next Election: Primary 2026
Fifth District
(San Lorenzo Valley, most of First Elected: 2024
Monica Martinez
Scotts Valley, parts of Santa Next Election: Primary 2028
Cruz, and Paradise Park)
The Board of Directors meets on most Tuesdays in the Board of Supervisors’ Chambers,
701 Ocean Street, Room 525. Meetings generally begin at 9:00am. Public notice is
provided through posting. The County contracts for independent audits.
Management Efficiencies
CSAs designate two authorized representatives to act as liaisons to the Department of
Public Works for any matter pertaining to their CSA operations. Once a year, the CSA
must hold a meeting of affected property owners to establish benefit assessment rates
and a work program. The Board of Supervisors then sets the rates and approves the
CSA’s annual budget. The benefit assessments are collected through property tax bills in
December and April each year. As previously mentioned, the benefit assessments have
remained unchanged for over a decade.
County Service Area 9 Service & Sphere Review Page 16 of 60
Capital Improvement Plan
The County recently adopted a five-year capital improvement plan specifically for roads,
drainage, sanitations, roadside betterments, parks and county facilities (refer to
Appendix 3). The purpose of a Capital Improvement Plan (CIP) is to identify and prioritize
needs and project costs for planned improvements to the infrastructure that will serve the
affected ratepayers in an efficient and cost-effective manner throughout the next five-plus
years of growth and change. A total of 5 capital improvement projects relating to CSA 9
are scheduled to be completed between FY 2020-21 to FY 2024-25. The following
summarizes the scheduled projects:
Table 9: Capital Improvement Projects
Project Project Expected Estimated
Type Location Cost Amount Completion Date
CSA 9
Project #1 Road Aptos $7,392,194 2020
Project #2 Traffic Safety Soquel $1,094,113 2024
CSA 9 (Zone C)
San
Project #3 Landfill $1,013,300 2020
Andreas
San
Project #4 Landfill $6,000,000 2021
Andreas
San
Project #5 Landfill $22,083,806 2025
Andreas
CSA 9 (Other Zones)
CSA (Zone B) No projects scheduled between 2020 to 2025
CSA (Zone D) No projects scheduled between 2020 to 2025
CSA (Zone E) No projects scheduled between 2020 to 2025
CSA (Zone F) No projects scheduled between 2020 to 2025
1. CSA 9 – Road Project in Aptos: Phase I includes road construction and roadside
improvements on Soquel Drive and Trout Gulch Road with a new traffic signal at
Soquel Drive/Trout Gulch Road, modified railroad crossing over Trout Gulch Road,
new bus pullout on Soquel Drive, drainage improvements, ADA-compliant pedestrian
improvements, and new bike lanes on Trout Gulch Road.
County Service Area 9 Service & Sphere Review Page 17 of 60
Phase II will include additional road construction and roadside improvements on
Soquel Drive from Trout Gulch Road to Aptos Creek Bridge, adding a new traffic signal
at Soquel Drive / Aptos Creek Road, a new railroad crossing over Aptos Creek Road,
and a sidewalk and bike lanes on Soquel Drive.
2. CSA 9 – Traffic Safety Project in Soquel: This project involves the installation of a
traffic signal to improve traffic flow at the intersection of Soquel Drive at Robertson
Street in the Town of Soquel. The intersection currently has a three-way stop traffic
control sign. Along with signal installation there will also be improvements to curb
ramps and roadway striping. The project will improve traffic flow operations as well as
pedestrian access through the area.
3. CSA 9 (Zone C) – Landfill Project in San Andreas (Project 1 of 3): Design and
installation of a landfill gas mini-flare for burning of landfill gases. The City of
Watsonville will be sharing 1/3 of the costs for this project as part of their existing
agreement with the Buena Vista Landfill. This project number is also used for the
maintenance of the existing landfill gas system.
The new flare will supplement the landfill gas control and conveyance system by
adding a third gas destruction device that will work in concert with the co-gen facility
and existing flare. It will help to better extract gas from the landfill and control surface
emissions and the subsurface migration of gas per Federal and State compliance
requirements. This in turn will minimize staff time required to monitor gas probes and
costs associated with mitigating and implementing gas migration corrective measures.
4. CSA 9 (Zone C) – Landfill Project in San Andreas (Project 2 of 3): Design and
construction of a compost facility at the Buena Vista Landfill. State law mandates that
by 2021, all residents and businesses must compost food scraps. In order to comply,
the County must locate a facility that can accept and process the anticipated volumes
from Santa Cruz County households and businesses.
5. CSA 9 (Zone C) – Landfill Project in San Andreas (Project 3 of 3): Design and
construction of a transfer station at the Buena Vista Landfill. The most recent aerial
survey shows that the Buena Vista Landfill is estimated to be filled to capacity within
twelve years at the current rate of disposal. The County does not have any further
space to construct a new module, and a transfer station is necessary to ensure that
the County will have a local facility to sort and process materials from its residents and
businesses.
LAFCO Staff Recommendation: It may be beneficial for the County to identify capital
improvement projects or potential infrastructure repairs involving all zones in order to
raise enough capital and have an adequate amount of funding earmarked for future
improvements or needs.
County Service Area 9 Service & Sphere Review Page 18 of 60
Opportunities & Challenges
Both independent and dependent special districts are tasked with operating in an efficient
and transparent manner on a regular basis. LAFCO staff has taken the position that public
agencies should always prepare and consider future opportunities and potential
challenges in order to properly provide and sustain adequate services to their
constituents. The following section explores possible actions that should be considered
by the CSA.
Website Requirements
Senate Bill 929 was signed into law in September 2018 and requires all independent
special districts to have and maintain a website by January 1, 2020. SB 929 identifies
several components that must be found within an agency’s website. Additionally, the
Special District Leadership Foundation (SDLF), an independent, non-profit organization
formed to promote good governance and best practices among California’s special
districts, has also outlined recommended website elements as part of its District
Transparency Certificate of Excellence. This program was created as an effort to promote
transparency in the operations and governance of special districts to the public.
Based on SB 929’s criteria and the recommendations set by the SDLF, LAFCO conducted
a thorough review of the CSA’s website (even though said law only applies to independent
special districts). Table 10 summarizes staff’s findings on whether the website meets the
statutory requirements. At present, the CSA does not meet the statutory requirements set
under SB 929 and SDLF’s website transparency criteria. In fact, LAFCO found minimal
information about CSA 9 on the County’s website. The financial information used to
conduct LAFCO’s analysis for this service review was available within the County’s
budget and audit webpages, but were retrieved after a thorough examination of the fiscal
documentations. There is currently no financial information available exclusively for CSA
9 at this time. It is LAFCO’s recommendation that the County provide more information
for CSA 9. This recommendation is consistent with previous requests for other CSAs
within Santa Cruz County.
Table 10: Website Transparency
Website Components Checkmark (Yes)
Required Items (SB 949 Criteria and SDLF Benchmarks)
1. Names and Contact Information of Board Members*
2. Board Member Term Limits
3. Names of Key Staff, including General Manager
4. Contact Information for Staff √
5. Election/Appointment Procedure & Deadlines
6. Board Meeting Schedule*
7. Mission Statement
8. Description of District's Services/Functions and Service Area
9. Authorizing Statute/Enabling Act
10. Adopted District Budgets*
11. Financial Audits*
12. Archive of Board Meeting Agendas & Minutes*
13. Link to State Controller's Webpages for District's reported Board
Member and Staff Compensation
County Service Area 9 Service & Sphere Review Page 19 of 60
14. Link to State Controller's Webpages for District's reported
Financial Transaction Report
15. Reimbursement & Compensation Policy / Annual Policies
16. Home Page Link to Agendas/Board Packets
17. SB 272 - Compliance-Enterprise Catalogs
18. Machine Readable/Searchable Agendas
19. Recipients of Grant Funding or Assistance
20. Link or Copies of LAFCO’s Service & Sphere Reviews √
Total Score (out of a possible 20) 2 (10%)
Additional Items (SDLF’s Recommended Elements)
1. Board Member Ethics Training Certificates
2. Picture, Bio, and Email Addresses of Board Members
3. Last Three Years of Audits
4. Financial Reserves Policy
5. Online/Downloadable Public Records Act Request Form
6. Audio or Video Recordings of Board Meetings
7. Map of District Boundaries/Service Area
8. Link to CSDA Mapping Program
9. General Description of Special Districts or Link to
www.districtmakethedifference.org
10. Link to Most Recently Filed to FPPC Forms
Total Score (out of a possible 10) 0 (0%)
*Footnote: Senate Bill 929 Statutory Requirements
LAFCO Staff Recommendation: While CSA 9 is not subject to SB 929, LAFCO
encourages more transparency from CSA 9 by sharing online information on how
residents can participate in the CSA’s decision-making process and future actions
regarding CSA 9 and its zones.
Sphere of Influence
Santa Cruz LAFCO adopted the first sphere of influence for CSA 9 on November 20,
1985. During the original designation, the Commission adopted a sphere that included
the entire County of Santa Cruz (all incorporated and unincorporated areas). CSA 9’s
sphere of influence was subject to the following conditions:
1. Municipal annexations to cities which do not utilize CSA 9 services shall be
accompanied by simultaneous detachments from CSA 9; and
2. If any city chooses not to participate in CSA 9 at the time any land is annexed
to the city, that land will be automatically taken out of the sphere of CSA 9.
The current sphere boundary has remained unchanged since the 1985 adoption. Figure
3 on page 21 shows the current sphere of influence boundary for CSA 9, which was
reaffirmed in August 2020. LAFCO staff is recommending that the sphere boundary be
reaffirmed with two conditions: (1) identify capital improvement projects or potential
infrastructure repairs for CSA 9 and all zones, and (2) conduct an analysis to determine
when and how should existing benefit assessments for CSA 9 and its zones need to be
increased in order to raise adequate funding for the scheduled future improvements.
County Service Area 9 Service & Sphere Review Page 20 of 60
Figure 3: CSA 9’s Sphere of Influence
County Service Area 9 Service & Sphere Review Page 21 of 60
CSA Summary
County Service Area 9
California Government Code, section 25210 et seq.
Formation
(County Service Area Law)
Board of Directors 5 members, elected at-large to four-year terms
Contact Person Greg Martin, Senior Civil Engineer
Employees 4 full-time Public Works employees assigned to CSA 9
Facilities N/A
Entire County, excluding the Cities of Capitola, Santa Cruz and
District Area
Watsonville (Approximately 425 square miles)
Coterminous with County Limits (i.e. no sphere beyond existing
Sphere of Influence
jurisdictional boundary)
Total Revenue = $224,234
FY 2024-25 Budget Total Expenditure = $1,232,745
Projected Surplus/(Deficit) = ($8,511)
Mailing Address: 701 Ocean Street, Room 410, Santa Cruz CA
95060
Phone Number: (831) 454-2160
Contact Information
Email Address: greg.martin@santacruzcountyca.us
Website: https://www.dpw.co.santa-cruz.ca.us/Home/CSAs.aspx
The Board regularly meets on most Tuesdays in the Board of
Public Meetings Supervisors' Chambers, 701 Ocean St, Rm. 525. Meetings
generally begin at 9:00 am.
County Service Area 9 Service & Sphere Review Page 22 of 60
Service & Sphere Determinations
The following service and sphere review determinations fulfill the requirements outlined
in the Cortese-Knox-Hertzberg Act.
Service Determinations
Government Code Section 56430 requires LAFCO to conduct a service review before, or
in conjunction with, an action to establish or update a sphere of influence. Written
statements of determination must be prepared with respect to each of the following:
1. Growth and population projections for the affected area.
CSA 9’s service area includes the City of Scotts Valley and the entire unincorporated
area in Santa Cruz County. Based on the Association of Monterey Bay Area
Government’s 2018 Regional Growth Forecast Report, the current population in
unincorporated Santa Cruz County and Scotts Valley are approximately 139,000 and
12,300, respectively. Under this slow growth model, LAFCO staff projects that CSA
9’s entire population in 2040 will be approximately 154,000.
2. The location and characteristics of any disadvantaged unincorporated
communities within or contiguous to the sphere of influence.
CSA 9 is not subject to SB 244 because it does not provide water, sewer, or fire
service.
3. Present and planned capacity of public facilities, adequacy of public services,
and infrastructure needs or deficiencies including needs or deficiencies related
to sewers, municipal and industrial water, and structural fire protection in any
disadvantaged, unincorporated communities within or contiguous to the sphere
of influence.
The County recently adopted a five-year capital improvement plan (CIP) specifically
for roads, drainage, sanitations, roadside betterments, parks and county facilities. This
CIP includes scheduled projects for CSA 9. The purpose of a CIP is to identify and
prioritize needs and project costs for planned improvements to the infrastructure that
will serve the affected ratepayers in an efficient and cost-effective manner throughout
the next five-plus years of growth and change.
4. Financial ability of agencies to provide services.
CSA 9’s primary source of revenue is from Charges for Services. Other funding
sources include Property Taxes, Use of Money and Property, and Intergovernmental
Funds. Once a year, the CSA must hold a meeting of affected property owners to
establish benefit assessment rates and a work program. CSA 9 experienced a deficit
four times between 2019 to 2023. The most recent adopted budget indicates that a
deficit may also occur.
5. Status of, and opportunities for, shared facilities.
The County is the lead agency for the development and administration of the
Countywide Integrated Waste Management Plan.
County Service Area 9 Service & Sphere Review Page 23 of 60
6. Accountability for community service needs, including governmental structure
and operational efficiencies.
CSA 9 services are addressed by the County Board of Supervisors during regular
meetings. The rate structures for CSA 9 and its zones are reviewed annually based
on available financing and projected maintenance needs. Rate changes are
implemented through public process that includes voter or landowner approval.
7. Any other matter related to effective or efficient service delivery, as required by
commission policy.
No additional local LAFCO policies are specifically relevant to this service review.
Sphere Determinations
Government Code Section 56425 requires LAFCO to periodically review and update
spheres in concert with conducting municipal service reviews. Spheres are used as
regional planning tools to discourage urban sprawl and encourage orderly growth. Written
statements of determination must be prepared with respect to each of the following:
1. The present and planned land uses in the area, including agricultural and open-
space lands.
The present and planned uses in the County are for a range of urban and rural uses.
The general plans for the County and the four cities anticipate growth centered on the
existing urban areas and for maintenance of agricultural production, rural residential
uses, and environmental protection in the rural areas.
2. The present and probable need for public facilities and services in the area.
CSA 9 performs a series of Public Works services that are provided to sub-areas of
the County. These services are highway lighting, neighborhood street lighting, landfill
operations, recycling, unincorporated road maintenance, school crossing guards,
streetscape maintenance, and parking maintenance.
3. The present capacity of public facilities and adequacy of public services that
the agency provides or is authorized to provide.
The services provided by CSA 9 are generally adequate. County roads are in fair
condition in most areas; however, the County lacks sufficient funding to improve the
roads.
4. The existence of any social or economic communities of interest in the area if
the Commission determines that they are relevant to the agency.
CSA Law allows the County to establish zones for each of the services provided by
CSA 9. In that manner, the communities of interest are the areas desiring each
service. Cities can be added to a CSA zone only if authorized by resolution of the
affected City Council.
5. For an update of a sphere of influence of a city or special district that provides
public facilities or services related to sewers, municipal and industrial water, or
structural fire protection, that occurs pursuant to subdivision (g) on or after July
1, 2012, the present and probable need for those public facilities and services
of any disadvantaged unincorporated communities within the existing sphere
of influence.
CSA 9 does not provide services related to sewers, municipal and industrial water, or
structural fire protection. Therefore, this determination is not applicable.
County Service Area 9 Service & Sphere Review Page 24 of 60
CSA 9 (Zone A)
Zone Overview
CSA 9’s Zone A was formed on December 23, 1969. This zone was created to provide
for the costs associated with the installation and maintenance of residential and
commercial street lighting for over 141 miles of the unincorporated county road network.
Zone A is specific to unincorporated residential and commercial areas that choose to have
streetlights, as shown in Figure 4 on page 26. Zone A pays for the installation and
maintenance of streetlights within this zone. Neighborhood street lighting is funded
through an assessment charge that is collected on the property tax bill. Appendix 4
provides a copy of the 1969 formation resolution.
The County currently provides street lighting to portions of Felton, Ben Lomond,
Brookdale, and Boulder Creek as well as Davenport, Live Oak, Aptos, Seascape, La
Selva Beach, Freedom, and Corralitos. The original street lighting districts are listed in
Table I below:
Table 11: Original Lighting Districts
Number Name Number Name
1 East Twin Lakes 9 Boulder Creek-Brookdale
2 Davenport 10 Pleasure Point
3 Felton 11 Broadview
4 Twin Lakes 12 Santa Cruz Gardens
5 Capitola 13 Freedom
6 Soquel 14 Interlochen
7 Pacific West-Meadowood 15 Ben Lomond
8 Bear Creek 16 Aptos Beach Pines
Population & Growth
Official growth projections are not available for CSA 9 or its zones. In general,
unincorporated areas in Santa Cruz County are projected to have slow growth over the
next fifteen years. Based on the Association of Monterey Bay Area Government’s 2018
Regional Growth Forecast Report, the current population in unincorporated Santa Cruz
County is approximately 138,000 and is expected to grow by 1% each year. Under this
slow growth model, LAFCO staff projects that Zone A’s population in 2040 will be
approximately 58,400. The projected population growth for CSA 9’s Zone A are as
follows:
Table 12: Projected Population
2020 2025 2030 2035 2040
CSA 9 (Zone A) 56,107 56,668 57,234 57,807 58,385
County Service Area 9 Service & Sphere Review Page 25 of 60
Figure 4: CSA 9 (Zone A) Vicinity Map
County Service Area 9 Service & Sphere Review Page 26 of 60
Finances
This section will highlight the Zone A’s audited financial performance during the most
recent fiscal years. Fiscal Year 2023-24 is the latest audited financial statement available.
A comprehensive analysis of Zone A’s financial performance during the past five years is
shown in Table 14, on page 29.
At the end of Fiscal Year 2023-24, total revenue collected was approximately $887,000,
representing a 9% increase from the previous year ($811,000 in FY 22-23). Total
expenses for FY 2023-24 were approximately $407,000, which increased from the
previous year by 26% ($323,000 in FY 22-23). As shown in the figure below, Zone A has
ended the fiscal year in a surplus since 2019 (FY 19-20 and 23-24). However, based on
the most recently available adopted budget, the Zone will experience a significant
financial shortfall.
Figure 5: Statement of Revenues & Expenditures
$4,500,000
$4,000,000 $3,873,893
$3,500,000
$3,000,000
$2,500,000
$2,000,000
$1,500,000
$1,000,000 $729,631 $887,507
$810,566
$699,262 $720,676 $742,308
$611,278 $699,044
$547,066
$500,000 $406,682
$322,858
$-
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
TOTAL REVENUE TOTAL EXPENDITURE
*Footnote: FY 2024-25 Budget includes a significant increase in two key budget line
items: Services & Supplies and Appropriations for Contingencies. Upcoming costs include
streetlighting improvements throughout the county.
County Service Area 9 Service & Sphere Review Page 27 of 60
Revenue
Zone A’s primary source of revenue is from property taxes. In FY 2023-24, taxes collected
was approximately $671,000 which represents 76% of the Zone’s entire revenue stream.
Other revenue sources include Charges for Services ($105,000), Use of Money and
Property ($107,000), and Intergovernmental Funds ($4,000). Figure 6 provides a
breakdown for each revenue stream.
Figure 6: Total Revenue (FY 2023-24)
Charges for Services
$104,809 (11.81%)
Intergovernmental
$4,189 (0.47%)
Use of Money & Property
$107,042 (12.06%)
Taxes
$671,467 (75.66%)
Charges for Services
Based on staff analysis, benefit assessments have never been increased for the zone.
Below shows the rates during the past decade. The County Board of Supervisors adopted
the same benefit assessment levels for FY 2024-25 on May 14, 2024. Increasing the
benefit assessment rates may help address the anticipated deficit for FY 2024-25 and
future budgets.
Table 13: Charges for Services
FY 2015-2016 to FY 2023-24 FY 2024-25
Parcel
(Actual) (Adopted)
Vacant $2.35 $2.35
Single Family $4.70 $4.70
Mobile Home $2.82 $2.82
Commercial $4.70 $4.70
Multi-Unit $2.82 $2.82
Expenditure
County Service Area 9 Service & Sphere Review Page 28 of 60
Zone A’s total expenditures can be categorized into two budgetary groups: Services and
Supplies and Fixed Assets. However, in FY 2023-24, Services and Supplies represented
100% of the zone’s entire operational expenses. Table 14 provides an overview of all
revenues and expenditures from FY 2019-20 to FY 2024-25.
Table 14: Total Revenues & Expenditures
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Taxes
Property Tax - Current Secured-Gen $ 471,178 $ 493,679 $ 512,893 $ 547,333 $ 575,304 $ 576,094
Residual Distribution $ 8 9,358 $ 6 4,547 $ 5 5,275 $ 7 6,013 $ 7 2,348 $ -
Property Tax - Current Unsecured-Gen $ 9 ,275 $ 8 ,428 $ 9 ,543 $ 1 0,126 $ 1 1,454 $ 2 2,377
Property Tax - Prior Unsecured-Gen $ 9 37 $ 1 ,766 $ 1 ,096 $ 1 ,010 $ 1 ,356 $ 1 ,525
Penalties for Deliquent Taxes $ 1 03 $ 8 9 $ 3 9 $ 1 20 $ 1 41 $ 1 95
Redemption Penalties for Deliquent Taxes $ 9 8 $ 1 46 $ 7 2 $ 1 02 $ 1 39 $ 1 53
Supplemental Property Tax - Current Secured $ 1 0,718 $ 6 ,905 $ 2 0,461 $ 1 9,537 $ 8 ,421 $ 7 ,059
Supplemental Property Tax - Current Unsecured$ 1 41 $ 3 05 $ 2 54 $ 8 35 $ 6 18 $ 4 72
Supplemental Property Tax - Prior Secured $ 7 70 $ 8 15 $ 3 30 $ 1 ,114 $ 1 ,297 $ 1 ,937
Supplemental Property Tax - Prior Unsecured $ 3 13 $ 1 25 $ 1 43 $ 2 19 $ 3 89 $ 2 49
In-Lieu Taxes Other $ 4 5 $ 4 1 $ 2 1 $ - $ - $ -
Total Taxes $ 582,936 $ 576,846 $ 600,127 $ 656,409 $ 671,467 $ 610,061
Revenue from Use of Money & Property
Interest $ 3 6,435 $ 1 2,617 $ 9 ,297 $ 4 3,650 $ 107,042 $ 2 5,000
Total Revenue from Use of Money & Property$ 3 6,435 $ 1 2,617 $ 9 ,297 $ 43,650 $ 107,042 $ 2 5,000
Intergovernmental Revenues
St-Homeowners' Property Tax Relief $ 2 ,687 $ 2 ,665 $ 2 ,671 $ 2 ,660 $ 2 ,762 $ 829
RDA Pass-Throughs $ 1,635 $ 1 ,636 $ 2 ,473 $ 2 ,211 $ 1 ,427 $ 1 ,575
Total Intergovernmental Revenues $ 4 ,322 $ 4 ,301 $ 5 ,144 $ 4 ,871 $ 4 ,189 $ 2 ,404
Charges for Services
Other Road & Street Services $ 105,938 $ 105,498 $ 106,108 $ 105,636 $ 104,809 $ 104,843
Total Charges for Services $ 105,938 $ 105,498 $ 106,108 $ 105,636 $ 104,809 $ 104,843
Other Financing Sources
Operating Transfer In $ - $ - $ - $ - $ - $ -
Total Other Financing Sources $ - $ - $ - $ - $ - $ -
TOTAL REVENUE $ 729,631 $ 699,262 $ 720,676 $ 810,566 $ 887,507 $ 742,308
EXPENDITURE
Salaries & Employee Benefits
Regular Pay -Permanent $ - $ - $ (2,436) $ 2 ,436 $ - $ -
Social Security $ - $ - $ ( 181) $ 181 $ - $ -
PERS $ - $ - $ ( 665) $ 665 $ - $ -
Employee Insurance & Benefits $ - $ - $ ( 888) $ 888 $ - $ -
Total Salaries & Employee Benefits $ - $ - $ (4,170) $ 4 ,170 $ - $ -
Services and Supplies
DPW Services-General Money $ 611,225 $ 699,080 $ 451,254 $ 318,688 $ 406,682 $ 2 ,369,021
Total Services and Supplies $ 611,225 $ 699,080 $ 451,254 $ 318,688 $ 406,682 $ 2,369,021
Fixed Assets
Building and Improvements $ 5 3 $ (36) $ (18) $ - $ - $ 1 0,000
Total Fixed Assets $ 53 $ (36) $ (18) $ - $ - $ 1 0,000
Other Financing Uses
Operating Transfers Out $ - $ - $ - $ - $ - $ -
Total Other Financing Uses $ - $ - $ - $ - $ - $ -
Appropriation for Contingencies
Appropriation for Contingencies $ - $ - $ 100,000 $ - $ - $ 1,494,872
Total Appropriation for Contingencies $ - $ - $ 100,000 $ - $ - $ 1 ,494,872
TOTAL EXPENDITURE $ 611,278 $ 699,044 $ 547,066 $ 322,858 $ 406,682 $ 3 ,873,893
Surplus/(Deficit) $ 118,353 $ 218 $ 173,610 $ 487,708 $ 480,825 $( 3,131,585)
County Service Area 9 Service & Sphere Review Page 29 of 60
Zone Summary
CSA 9 (Zone A)
California Government Code, section 25210.1 et seq.
Formation
(County Service Area Law)
Board of Directors 5 members, elected at-large to four-year terms
Contact Person Greg Martin, Senior Civil Engineer
Employees 2 full-time Public Works employees assigned to Zone A
Facilities Approximately 2,900 streetlights associated with Zone A
CSA 9 Zone A provides residential street lighting in portions of
Felton, Ben Lomond, Brookdale and Boulder Creek as well as
Zone Area
Davenport, Live Oak, Aptos, Seascape, La Selva Beach,
Freedom and Corralitos.
Sphere of Influence N/A
Total Revenue = $742,308
FY 2024-25 Budget Total Expenditure = $3,873,893
Projected Surplus/(Deficit) = ($3,131,585)
Mailing Address: 701 Ocean Street, Santa Cruz CA 95060
Phone Number: (831) 454-2160
Contact Information
Email Address: greg.martin@santacruzcountyca.us
Website: https://www.dpw.co.santa-cruz.ca.us/Home/CSAs.aspx
The Board regularly meets on most Tuesdays in the Board of
Public Meetings Supervisors' Chambers, 701 Ocean St, Rm. 525. Meetings
generally begin at 9:00 am.
County Service Area 9 Service & Sphere Review Page 30 of 60
CSA 9 (Zone B)
Zone Overview
CSA 9’s Zone B was formed on March 7, 1972. Zone B provides partial funding for the
school crossing guard program in the Live Oak Elementary School District, as shown in
Figure 7 on page 32. This program pre-dates Proposition 13, and therefore, the County
passes through the program’s share of the 1% property tax. Appendix 5 provides a copy
of the 1972 formation resolution.
Population & Growth
Official growth projections are not available for CSA 9 or its zones. In general,
unincorporated areas in Santa Cruz County are projected to have slow growth over the
next fifteen years. Based on the Association of Monterey Bay Area Government’s 2018
Regional Growth Forecast Report, the current population in unincorporated Santa Cruz
County is approximately 138,000 and is expected to grow by 1% each year. Under this
slow growth model, LAFCO staff projects that Zone B’s population in 2040 will be
approximately 25,000. The projected population growth for CSA 9’s Zone B are as
follows:
Table 15: Projected Population
2020 2025 2030 2035 2040
CSA 9 (Zone B) 23,678 23,915 24,154 24,396 24,640
Add Photo Here
County Service Area 9 Service & Sphere Review Page 31 of 60
Figure 7: CSA 9 (Zone B) Vicinity Map
County Service Area 9 Service & Sphere Review Page 32 of 60
Finances
This section will highlight the Zone B’s audited financial performance during the most
recent fiscal years. Fiscal Year 2023-24 is the latest audited financial statement available.
A comprehensive analysis of Zone B’s financial performance during the past five years is
shown in Table 16, on page 35.
At the end of Fiscal Year 2023-24, total revenue collected was approximately $30,200,
representing a 3% increase from the previous year ($29,300 in FY 22-23). Total expenses
for FY 2023-24 were approximately $13,800, which decreased from the previous year by
3% ($14,200 in FY 22-23). As shown in the figure below, Zone B has ended each fiscal
year with a surplus since 2019. However, based on the most recently available adopted
budget, the Zone will experience a significant financial shortfall.
Figure 8: Statement of Revenues & Expenditures
$120,000
$113,090
$100,000
$80,000
$60,000
$40,000
$29,269 $30,185
$26,658
$22,726 $23,182
$20,000 $16,599
$15,508 $15,141 $14,733 $14,222 $13,750
$-
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
TOTAL REVENUE TOTAL EXPENDITURE
*Footnote: FY 2024-25 Budget includes a significant increase in two key budget line
items: Services & Supplies and Contributions to Other Agencies. Upcoming costs will
address the rising expenses to fulfill the school crossing guard program.
County Service Area 9 Service & Sphere Review Page 33 of 60
Revenues
Zone B’s primary source of revenue is from property taxes. Unlike CSA 9 and the other
zones, Zone B does not collect any benefit assessments. In FY 2023-24, taxes collected
were approximately $27,000 which represents 89% of the Zone’s entire revenue stream.
Other revenue sources include Use of Money and Property ($3,200), and
Intergovernmental Funds ($231). Figure 9 provides a breakdown for each revenue
stream.
Figure 9: Total Revenue (FY 2023-24)
Use of Money & Property
$3,167 (10%)
Intergovernmental
$231 (1%)
Taxes
$26,787 (89%)
Expenditures
Zone B’s total expenditures can be categorized into two budgetary groups: Services and
Supplies and Contributions to Other Agencies. Figure 10 shows that in FY 2023-24,
Contributions to other agencies represent 98% of the Zone’s entire operational expenses.
The remaining expenditures are based on services and supplies.
Figure 10: Total Expenditure (FY 2023-24)
Services & Supplies
$340 (2%)
Contributions to Other Agencies
$13,410 (98%)
County Service Area 9 Service & Sphere Review Page 34 of 60
Table 16: Total Revenues & Expenditures
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Taxes
Property Tax - Current Secured-Gen $ 9 ,753 $ 1 0,486 $ 1 1,293 $ 1 2,749 $ 1 3,280 $ 1 3,256
Residual Distribution $ 1 4,822 $ 1 0,897 $ 9 ,571 $ 1 3,156 $ 1 2,542 $ -
Property Tax - Current Unsecured-Gen $ 1 90 $ 1 77 $ 2 09 $ 2 34 $ 2 63 $ 5 13
Property Tax - Prior Unsecured-Gen $ 1 8 $ 3 7 $ 2 4 $ 2 3 $ 3 1 $ 3 5
Penalties for Deliquent Taxes $ 6 $ 5 $ 2 $ 7 $ 9 $ 1 2
Redemption Penalties for Deliquent Taxes $ 6 $ 9 $ 4 $ 6 $ 8 $ 9
Supplemental Property Tax - Current Secured $ 6 38 $ 4 14 $ 1 ,231 $ 1 ,191 $ 5 13 $ 4 30
Supplemental Property Tax - Current Unsecured$ 9 $ 1 8 $ 1 5 $ 5 1 $ 3 8 $ 2 9
Supplemental Property Tax - Prior Secured $ 4 6 $ 4 9 $ 2 0 $ 6 8 $ 7 9 $ 1 18
Supplemental Property Tax - Prior Unsecured $ 1 9 $ 8 $ 9 $ 1 3 $ 2 4 $ 1 5
In-Lieu Taxes Other $ 26 $ 2 3 $ 1 2 $ - $ - $ -
Total Taxes $ 25,533 $ 22,123 $ 22,390 $ 27,498 $ 2 6,787 $ 14,417
Revenue from Use of Money & Property
Interest $ 8 42 $ 3 61 $ 3 58 $ 1,357 $ 3 ,167 $ 2 ,182
Total Revenue from Use of Money & Property $ 8 42 $ 3 61 $ 3 58 $ 1 ,357 $ 3 ,167 $ 2 ,182
Intergovernmental Revenues
St-Homeowners' Property Tax Relief $ 5 7 $ 5 8 $ 5 1 $ 6 3 $ 6 5 $ -
RDA Pass-Throughs $ 2 26 $ 1 84 $ 3 83 $ 3 51 $ 1 66 $ -
Total Intergovernmental Revenues $ 2 83 $ 2 42 $ 4 34 $ 4 14 $ 2 31 $ -
TOTAL REVENUE $ 2 6,658 $ 2 2,726 $ 2 3,182 $ 2 9,269 $ 3 0,185 $ 1 6,599
EXPENDITURE
Services and Supplies
DPW Services-General Money $ 5 08 $ 1 41 $ 1 87 $ 1 40 $ 3 40 $ 49,955
Total Services and Supplies $ 5 08 $ 1 41 $ 1 87 $ 1 40 $ 3 40 $ 49,955
Other Charges
Contribution to Other Agencies $ 1 5,000 $ 1 5,000 $ 1 4,546 $ 1 4,082 $ 1 3,410 $ 6 3,135
Total Other Charges $ 15,000 $ 15,000 $ 14,546 $ 14,082 $ 1 3,410 $ 63,135
Appropriation for Contingencies
Appropriation for Contingencies $ - $ - $ - $ - $ -
Total Appropriation for Contingencies $ - $ - $ - $ - $ - $ -
TOTAL EXPENDITURE $ 1 5,508 $ 1 5,141 $ 1 4,733 $ 1 4,222 $ 1 3,750 $ 113,090
Surplus/(Deficit) $ 11,150 $ 7 ,585 $ 8 ,449 $ 15,047 $ 1 6,435 $ ( 96,491)
County Service Area 9 Service & Sphere Review Page 35 of 60
Zone Summary
CSA 9 (Zone B)
California Government Code, section 25210.1 et seq.
Formation
(County Service Area Law)
Board of Directors 5 members, elected at-large to four-year terms
Contact Person Christine Hicks, Admin Service Manager
Employees 1 full-time Public Works employee assigned to Zone B
Facilities N/A
Zone Area Live Oak Elementary School District (appx. 3 square miles)
Sphere of Influence N/A
Total Revenue = $16,599
FY 2024-25 Budget Total Expenditure = $113,090
Projected Surplus/(Deficit) = ($96,491)
Mailing Address: 701 Ocean Street, Santa Cruz CA 95060
Phone Number: (831) 454-2160
Contact Information
Email Address: christine.hicks@santacruzcountyca.us
Website: https://www.dpw.co.santa-cruz.ca.us/Home/CSAs.aspx
The Board regularly meets on most Tuesdays in the Board of
Public Meetings Supervisors' Chambers, 701 Ocean St, Rm. 525. Meetings
generally begin at 9:00 am.
County Service Area 9 Service & Sphere Review Page 36 of 60
CSA 9 (Zone C)
Zone Overview
CSA 9’s Zone C was formed on June 15, 1982. The purpose of the zone is to provide
additional extended service for refuse disposal in CSA 9. Today, Zone C operates the
Buena Vista Landfill and the related recycling and resource recovery activities, as shown
in Figure 11 on page 38. It also maintains the closed Ben Lomond Landfill, and operates
the Ben Lomond Transfer Station. Zone C supports administration of the refuse and
recycling franchise collection program, landfill environmental compliance programs,
refuse abatement programs, and waste reduction and recycling programs. Appendix 6
provides a copy of the 1982 formation resolution.
Population & Growth
Official growth projections are not available for CSA 9 or its zones. In general,
unincorporated areas in Santa Cruz County are projected to have slow growth over the
next fifteen years. Based on the Association of Monterey Bay Area Government’s 2018
Regional Growth Forecast Report, the current population in unincorporated Santa Cruz
County is approximately 138,000 and is expected to grow by 1% each year. Under this
slow growth model, LAFCO staff projects that Zone C’s population in 2024 will be
approximately 154,000. The projected population growth for CSA 9’s Zone C are as
follows:
Table 17: Projected Population
2020 2025 2030 2035 2040
CSA 9 (Zone C) 149,036 150,110 151,387 152,704 154,000
County Service Area 9 Service & Sphere Review Page 37 of 60
Figure 11: CSA 9 (Zone C) Vicinity Map
County Service Area 9 Service & Sphere Review Page 38 of 60
Finances
This section will highlight the Zone C’s audited financial performance during the most
recent fiscal years. Fiscal Year 2023-24 is the latest audited financial statement available.
A comprehensive analysis of Zone C’s financial performance during the past five years is
shown in Table 19, on page 42.
At the end of Fiscal Year 2023-24, total revenue collected was approximately $28 million,
representing a 12% increase from the previous year ($24.6 million in FY 22-23). Total
expenses for FY 2023-24 were approximately $23 million, which increased from the
previous year by 9% ($21.1 million in FY 22-23). As shown in the figure below, Zone C
has ended in a surplus each fiscal year since 2019. However, based on the most recently
available adopted budget, this positive trend may not continue due to rising costs.
Figure 12: Statement of Revenues & Expenditures
$35,000,000
$30,093,966
$30,000,000
$27,632,969
$27,112,173
$24,638,198
$25,000,000
$22,877,516
$21,084,903
$20,000,000 $19,350,448 $18,732,150
$18,311,136 $18,360,759
$17,396,923
$16,377,807
$15,000,000
$10,000,000
$5,000,000
$-
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
TOTAL REVENUE TOTAL EXPENDITURE
County Service Area 9 Service & Sphere Review Page 39 of 60
Revenues
Zone C’s primary source of revenue is from Charges for Services. In FY 2023-24,
Charges for Services totaled approximately $26 million, which represents 94% of the
Zone’s entire revenue stream. Other revenue sources include Non-Operating Revenue
($1.3 million) and Miscellaneous Revenue ($187,000). Figure 13 provides a breakdown
for each revenue stream.
Figure 13: Total Revenue (FY 2023-24)
Misc Revenue
$186,716 (1%)
Charges for Services
$26,127,017 (94%)
Non-Operating Revenue
$1,319,236 (5%)
Charges for Services
Based on staff’s analysis, benefit assessments have never been increased for the zone.
Table P on page 41 shows the rates during the past decade. The County Board of
Supervisors adopted the same benefit assessment levels for FY 2024-25 on May 14,
2024. Increasing the benefit assessment rates may help address the anticipated deficit
for FY 2024-25 and future budgets.
County Service Area 9 Service & Sphere Review Page 40 of 60
Table 18: Charges for Services
FY 2015-16 to FY 2023-24 FY 2024-25
Parcel
(Actual) (Adopted)
Single Family $56.94 $56.94
Apartment/MH $28.48 $28.48
Comm/School/Church $113.90 $113.90
Agricultural $113.90 $113.90
Vacant $0 $0
Expenditures
Zone C’s total expenditures can be categorized into three budgetary groups: Services
and Supplies, Non-Operating Expenses, and Other Charges. Figure 14 shows that in FY
2023-24, Services and Supplies represent 91% of the Zone’s entire operational
expenses.
Figure 14: Total Expenditure (FY 2023-24)
Services & Supplies
Non-Operating … $20,839,568 (91%)
Other Charges
$1,815,381 (8%)
County Service Area 9 Service & Sphere Review Page 41 of 60
Table 19: Total Revenues & Expenditures
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Taxes
Penalties for Deliquent Taxes $ - $ - $ - $ - $ - $ -
Redemption Penalties for Deliquent Taxes $ - $ - $ - $ - $ - $ -
Total Taxes $ - $ - $ - $ - $ - $ -
Charges for Services
Garbage Collection-San Andreas $ - $ 1 ,080 $ - $ 5 ,410 $ -
Encroachment Fees $ - $ 1 6 $ - $ - $ 355 $ -
Refuse Disposal Fees $1 0,341,838 $1 1,087,818 $ 9,747,610 $1 0,275,576 $1 2,393,260 $1 1,300,000
Other Waste Hauler Payments $ 3,674,519 $ 4,225,346 $ 4,442,498 $ 5,104,872 $ 4,937,789 $ 5,247,104
District Service Charges $ 3,224,988 $ 3,222,498 $ 3,190,712 $ 3,189,411 $ 3,187,543 $ 3,190,110
District Service Charges Others $ - $ - $ - $ 4,887,508 $ 5,554,419 $ 6,239,356
Other Charges Current Services $ 86,259 $ 98,836 $ 71,544 $ 57,336 $ 53,651 $ 50,000
Total Charges for Services $1 7,327,604 $1 8,635,594 $1 7,452,364 $2 3,520,113 $2 6,127,017 $2 6,026,570
Miscellaneous Revenues
Other Court Fees & Costs $ - $ - $ - $ - $ - $ -
Other Charges - Prop FD Revenue SH $ - $ - $ 1 ,781 $ - $ - $ -
Cost Recovery-Other $ - $ - $ - $ - $ - $ -
NSF Checks $ - $ - $ - $ - $ - $ -
Other Revenue $ 4 48,046 $ 2 56,845 $ 5 54,557 $ 2 10,730 $ 1 86,716 $ 1 20,000
Total Miscellanous Revenues $ 4 48,046 $ 2 56,845 $ 5 56,338 $ 2 10,730 $ 1 86,716 $ 1 20,000
Non-Operating Revenues
Interest $ 1 36,619 $ 55,837 $ 49,523 $ 2 59,441 $ 5 14,835 $ 2 25,000
Interest - Non County Treasurer $ - $ - $ - $ 1 $ 20,084 $ -
St-Other $ 99,029 $ 74,506 $ 1 86,105 $ 76,846 $ 3 75,490 $ 2 20,184
Contribution from Other Government Agencies$ 2 99,838 $ 3 07,929 $ 4 77,820 $ 5 71,067 $ 3 91,852 $ 5 20,419
Gain on Sale of Fixed Asset $ - $ - $ 10,000 $ - $ 16,975 $ -
Aid from Other Government Districts/JPA/PFA$ - $ 19,737 $ - $ - $ - $ -
SLS of Fixed Assets-Non Taxable $ - $ - $ - $ - $ - $ -
Total Non-Operating Revenues $ 5 35,486 $ 4 58,009 $ 7 23,448 $ 9 07,355 $ 1,319,236 $ 9 65,603
Other Financing Sources
Operating Transfer In $ - $ - $ - $ - $ - $ -
Total Other Financing Sources $ - $ - $ - $ - $ - $ -
TOTAL REVENUE $1 8,311,136 $1 9,350,448 $ 18,732,150 $2 4,638,198 $2 7,632,969 $ 27,112,173
EXPENDITURE
Services and Supplies
Maint-Office Equipment-Services $ 1 0 $ 133 $ - $ - $ - $ -
DPW Services-General Money $1 5,110,519 $1 4,280,360 $1 6,304,845 $1 7,641,475 $2 0,839,568 $ 25,683,390
Total Services and Supplies $1 5,110,529 $1 4,280,493 $1 6,304,845 $1 7,641,475 $2 0,839,568 $2 5,683,390
Other Charges
Closure & Postclosure Care Exp $ - $ - $ - $ - $ 8,205 $ -
Depreciation Auto $ 1 77,010 $ 2 17,167 $ 2 29,470 $ 1 44,217 $ 1 78,351 $ 2 20,000
Depreciation Equipment $ 3 89,908 $ 4 13,879 $ 4 83,441 $ 5 10,341 $ 5 76,591 $ 5 50,000
Depreciation Structure & Imp $ 1,112,880 $ 1,078,343 $ 1,115,800 $ 1,125,750 $ 1,052,234 $ 1,100,000
Contribution to Other Funds $ 3 56,999 $ 1 42,449 $ - $ - $ - $ -
Total Other Charges $ 2,036,797 $ 1,851,838 $ 1,828,711 $ 1,780,308 $ 1,815,381 $ 1,870,000
Non-Operating Expenses
Interest on Cops $ 2 03,014 $ 2 03,990 $ 1 90,722 $ 1 77,146 $ 1 65,116 $ 1 75,500
Interest on Lease Purchases $ 46,583 $ 41,486 $ 36,481 $ 31,600 $ 57,451 $ 45,076
Loss on Disp of Fixed Assets $ - $ - $ - $ - $ - $ -
Total Non-Operating Expenses $ 2 49,597 $ 2 45,476 $ 2 27,203 $ 2 08,746 $ 2 22,567 $ 2 20,576
Other Financing Uses
Operating Transfer Out $ - $ 37,499 $ - $ 2,320,000
OP/TR Out-TO 131215 CERTS $ - $ 1,416,875 $ - $ -
Total Other Financing Uses $ - $ - $ - $ 1,454,374 $ - $ 2,320,000
TOTAL EXPENDITURE $1 7,396,923 $1 6,377,807 $ 18,360,759 $2 1,084,903 $2 2,877,516 $ 30,093,966
Surplus/(Deficit) $ 9 14,213 $ 2,972,641 $ 3 71,391 $ 3,553,295 $ 4,755,453 $ ( 2,981,793)
Footnote: Surplus/(Deficit) Amount are before year-end adjustments
County Service Area 9 Service & Sphere Review Page 42 of 60
Zone Summary
CSA 9 (Zone C)
California Government Code, section 25210.1 et seq.
Formation
(County Service Area Law)
Board of Directors 5 members, elected at-large to four-year terms
Contact Person Kasey Kolassa, Recycling & Solid Waste Services Manager
Employees 53 staff members
2 facilities (Buena Vista Landfill, 150 Rountree Lane,
Facilities Watsonville and Ben Lomond Transfer Station, 9835 Newell
Creek Road, Ben Lomond)
Entire County, excluding the Cities of Capitola, Santa Cruz and
Zone Area
Watsonville (Approximately 425 square miles)
Sphere of Influence N/A
Total Revenue = $27,112,173
FY 2024-25 Budget Total Expenditure = $30,093,966
Projected Surplus/(Deficit) = ($2,981,793)
Mailing Address: 701 Ocean Street, Room 410, Santa Cruz CA
95060
Phone Number: (831) 454-2377
Contact Information
Email Address: Kasey.Kolassa@santacruzcountyca.gov
Website: https://www.dpw.co.santa-cruz.ca.us/Home/CSAs.aspx
The Board regularly meets on most Tuesdays in the Board of
Public Meetings Supervisors' Chambers, 701 Ocean St, Rm. 525. Meetings
generally begin at 9:00 am.
County Service Area 9 Service & Sphere Review Page 43 of 60
CSA 9 (Zone D)
Zone Overview
CSA 9’s Zone D was formed on June 30, 1983. Zone D provides some supplemental
funding for county road maintenance through an assessment charge. In August 1983, the
County also established three sub-zones (D1, D2, and D3) to establish storm damage
repair and reconstruction of county roads as an additional extended service in CSA 9, as
shown in Figure 15 on page 45. The Board of Supervisors determined that the sub-zones’
service charges would vary based on the extent of benefit derived from such service
provided to parcels within the sub-zones. Appendix 7 provides a copy of the 1983
formation resolutions.
Population & Growth
Official growth projections are not available for CSA 9 or its zones. In general,
unincorporated areas in Santa Cruz County are projected to have slow growth over the
next fifteen years. Based on the Association of Monterey Bay Area Government’s 2018
Regional Growth Forecast Report, the current population in unincorporated Santa Cruz
County is approximately 138,000 and is expected to grow by 1% each year. Under this
slow growth model, LAFCO staff projects that Zone D’s population in 2040 will be
approximately 142,000. The projected population growth for CSA 9’s Zone D are as
follows:
Table 20: Projected Population
2020 2025 2030 2035 2040
CSA 9 (Zone D) 136,566 137,932 139,311 140,704 142,111
County Service Area 9 Service & Sphere Review Page 44 of 60
Figure 15: CSA 9 (Zone D) Vicinity Map
County Service Area 9 Service & Sphere Review Page 45 of 60
Finances
This section will highlight Zone D’s audited financial performance during the most recent
fiscal years. Fiscal Year 2023-24 is the latest audited financial statement available. A
comprehensive analysis of the Zone D’s financial performance during the past five years
is shown in Table 22, on page 47.
At the end of Fiscal Year 2023-24, total revenue collected was approximately $2.6 million,
representing a slight decrease from the previous year ($2.62 million in FY 22-23). Total
expenses for FY 2023-24 were approximately $2.6 million, which decreased from the
previous year by 1% ($2.62 million in FY 22-23). As shown in Figure 16, Zone D has
ended in a deficit in four of the last five fiscal years.
Figure 16: Statement of Revenues & Expenditures
$2,720,000
$2,698,994 $2,697,952
$2,700,000
$2,680,000
$2,659,295
$2,660,000
$2,649,788 $2,649,020
$2,641,377
$2,640,000
$2,624,329
$2,621,700
$2,620,000 $2,613,145
$2,602,323
$2,604,454
$2,601,835
$2,600,000
$2,580,000
$2,560,000
$2,540,000
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
TOTAL REVENUE TOTAL EXPENDITURE
Revenues
Zone D’s sole source of revenue is from Charges for Services. In FY 2023-24, Charges
for Services totaled approximately $2.6 million, which represents 100% of the Zone’s
entire revenue stream.
Charges for Services
Based on staff’s analysis, benefit assessments have never been increased for the zone.
Table 21 shows the rates during the past decade. The County Board of Supervisors
adopted the same benefit assessment levels for FY 2024-25 on May 14, 2024. Increasing
the benefit assessment rates may help to address future rising costs.
Table 21: Charges for Services
FY 2015-16 to FY 2023-24 FY 2024-25
Parcel
(Actual) (Adopted)
Improved $56.40 $56.40
Unimproved $28.20 $28.20
County Service Area 9 Service & Sphere Review Page 46 of 60
Expenditures
Zone D’s total expenditures can be categorized into one budgetary group: Services and
Supplies. Table 22 shows that services and supplies continues to represent the zone’s
primary expenditure during the last five fiscal years.
Table 22: Total Revenues & Expenditures
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Revenue from Use of Money & Property
Interest $ ( 12,093) $ 1 93 $ (3,756) $ (14,370) $ (32,588) $ ( 26,000)
Total Revenue from Use of Money & Property $ ( 12,093) $ 1 93 $ (3,756) $ (14,370) $ (32,588) $ ( 26,000)
Charges for Services
Other Road & Street Services $ 2 ,661,881 $2 ,659,102 $ 2 ,645,133 $2 ,636,070 $2 ,634,423 $ 2 ,639,145
Total Charges for Services $ 2 ,661,881 $ 2,659,102 $ 2 ,645,133 $ 2,636,070 $ 2,634,423 $ 2 ,639,145
TOTAL REVENUE $ 2 ,649,788 $2 ,659,295 $ 2 ,641,377 $2 ,621,700 $2 ,601,835 $ 2 ,613,145
EXPENDITURE
Services and Supplies
DPW Services-General Money $ 2 ,698,994 $2 ,649,020 $ 2 ,697,952 $2 ,624,329 $2 ,602,323 $ 2 ,604,454
Total Services and Supplies $ 2 ,698,994 $ 2,649,020 $ 2 ,697,952 $ 2,624,329 $ 2,602,323 $ 2 ,604,454
TOTAL EXPENDITURE $ 2 ,698,994 $2 ,649,020 $ 2 ,697,952 $2 ,624,329 $2 ,602,323 $ 2 ,604,454
Surplus/(Deficit) $ ( 49,206) $ 1 0,275 $ ( 56,575) $ ( 2,629) $ (488) $ 8 ,691
Financial Health of Sub-Zones
As previously mentioned, Zone D consists of three sub-zones (Zones 1, 2, and 3). Tables
23-25 on pages 48 and 49 provides a breakdown of the revenues and expenditures for
each zone. As the tables show, each sub-zone has experienced at least one annual deficit
during the last five fiscal years.
Table 23: CSA 9D (Zone 1) Financial Performance (FY 2019-20 to FY 2024-25)
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
CSA 9D (ZONE 1)
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Revenue from Use of Money & Property
Interest
Total Revenue from Use of Money & Property $ (5,882) $ 1 93 $ (1,184) $ ( 4,853) $ (11,706) $ ( 10,000)
Charges for Services
Other Road & Street Services
Total Charges for Services $ 860,198 $ 8 57,504 $ 840,958 $ 8 42,426 $ 8 41,922 $ 841,923
TOTAL REVENUE $ 854,316 $ 8 57,697 $ 839,774 $ 8 37,573 $ 8 30,216 $ 831,923
EXPENDITURE
Services and Supplies
DPW Services-General Money
Total Services and Supplies $ 852,830 $ 8 21,577 $ 877,613 $ 8 29,179 $ 8 26,639 $ 845,917
TOTAL EXPENDITURE $ 852,830 $ 8 21,577 $ 877,613 $ 8 29,179 $ 8 26,639 $ 845,917
Surplus/(Deficit) $ 1 ,486 $ 36,120 $ ( 37,839) $ 8,394 $ 3,577 $ ( 13,994)
County Service Area 9 Service & Sphere Review Page 47 of 60
Table 24: CSA 9D (Zone 2) Financial Performance (FY 2019-20 to FY 2024-25)
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
CSA 9D (ZONE 2)
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Revenue from Use of Money & Property
Interest
Total Revenue from Use of Money & Property $ (4,499) $ 6 56 $ (1,936) $ ( 7,268) $ (14,586) $ ( 15,000)
Charges for Services
Other Road & Street Services
Total Charges for Services $ 1 ,398,017 $ 1,398,110 $ 1 ,400,174 $ 1,391,988 $ 1,392,567 $ 1 ,393,220
TOTAL REVENUE $ 1 ,393,518 $1 ,398,766 $ 1 ,398,238 $1 ,384,720 $1 ,377,981 $ 1 ,378,220
EXPENDITURE
Services and Supplies
DPW Services-General Money
Total Services and Supplies $ 1 ,361,240 $ 1,425,648 $ 1 ,420,914 $ 1,383,820 $ 1,382,427 $ 1 ,361,610
TOTAL EXPENDITURE $ 1 ,361,240 $1 ,425,648 $ 1 ,420,914 $1 ,383,820 $1 ,382,427 $ 1 ,361,610
Surplus/(Deficit) $ 32,278 $ (26,882) $ ( 22,676) $ 9 00 $ ( 4,446) $ 16,610
Table 25: CSA 9D (Zone 3) Financial Performance (FY 2019-20 to FY 2024-25)
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
CSA 9D (ZONE 3)
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Revenue from Use of Money & Property
Interest
Total Revenue from Use of Money & Property $ (1,712) $ (656) $ (636) $ ( 2,249) $ ( 6,296) $ (1,000)
Charges for Services
Other Road & Street Services
Total Charges for Services $ 403,666 $ 4 03,488 $ 404,001 $ 4 01,656 $ 3 99,934 $ 404,002
TOTAL REVENUE $ 401,954 $ 4 02,832 $ 403,365 $ 3 99,407 $ 3 93,638 $ 403,002
EXPENDITURE
Services and Supplies
DPW Services-General Money
Total Services and Supplies $ 484,924 $ 4 01,795 $ 399,425 $ 4 11,330 $ 3 93,257 $ 396,927
TOTAL EXPENDITURE $ 484,924 $ 4 01,795 $ 399,425 $ 4 11,330 $ 3 93,257 $ 396,927
Surplus/(Deficit) $ ( 82,970) $ 1,037 $ 3 ,940 $ (11,923) $ 3 81 $ 6,075
County Service Area 9 Service & Sphere Review Page 48 of 60
Zone Summary
CSA 9 (Zone D)
California Government Code, section 25210.1 et seq.
Formation
(County Service Area Law)
Board of Directors 5 members, elected at-large to four-year terms
Contact Person Steve Weisner, Assistant Director
Employees 56 full-time Public Works employees assigned to Zone D
3 facilities (Brommer Yard – 2700 Brommer Street, Santa Cruz;
Facilities Wilson Yard – 198 Grimmer Road, Watsonville; and Felton
Yard – 201 Hihn Street, Felton)
Zone Area Entire County, excluding all four cities (appx. 420 square miles)
Sphere of Influence N/A
Total Revenue = $2,613,145
FY 2024-25 Budget Total Expenditure = $2,604,454
Projected Surplus/(Deficit) = $8,691
Mailing Address: 701 Ocean Street, Room 410, Santa Cruz CA
95060
Phone Number: (831) 454-2160
Contact Information
Email Address: Steve.Wiesner@santacruzcounty.us
Website: https://www.dpw.co.santa-cruz.ca.us/Home/CSAs.aspx
The Board regularly meets on most Tuesdays in the Board of
Public Meetings Supervisors' Chambers, 701 Ocean St, Rm. 525. Meetings
generally begin at 9:00 am.
County Service Area 9 Service & Sphere Review Page 49 of 60
CSA 9 (Zone E)
Zone Overview
CSA 9’s Zone E was formed on November 5, 1991. Zone E provides streetscape
maintenance services in the former Live Oak/Soquel Redevelopment Area, as shown in
Figure 17 on page 51. The zone maintains over 1,800 street trees, plus landscaping
areas via a contract with a private landscaping contractor. Appendix 8 provides a copy
of the 1991 formation resolution.
Population & Growth
Official growth projections are not available for CSA 9 or its zones. In general,
unincorporated areas in Santa Cruz County are projected to have slow growth over the
next fifteen years. Based on the Association of Monterey Bay Area Government’s 2018
Regional Growth Forecast Report, the current population in unincorporated Santa Cruz
County is approximately 138,000 and is expected to grow by 1% each year. Under this
slow growth model, LAFCO staff projects that Zone E’s population in 2040 will be
approximately 37,000. The projected population growth for CSA 9’s Zone E are as
follows:
Table 26: Projected Population
2020 2025 2030 2035 2040
CSA 9 (Zone E) 35,409 35,763 36,120 36,481 36,846
County Service Area 9 Service & Sphere Review Page 50 of 60
Figure 17: CSA 9 (Zone E) Vicinity Map
County Service Area 9 Service & Sphere Review Page 51 of 60
Finances
This section will highlight the Zone E’s audited financial performance during the most
recent fiscal years. Fiscal Year 2023-24 is the latest audited financial statement available.
A comprehensive analysis of the Zone E’s financial performance during the past five
years is shown in Table 28, on page 53.
At the end of Fiscal Year 2023-24, total revenue collected was approximately $38,800,
representing a 1% decrease from the previous year ($39,000 in FY 22-23). Total
expenses for FY 2023-24 were approximately $28,000, which decreased from the
previous year by 47% ($52,885 in FY 22-23). As shown in the figure below, Zone E has
ended the fiscal year in a deficit in three out of the last five fiscal years. Based on the
most recently available adopted budget, LAFCO staff believes this negative trend will
Figure 18: Statement of Revenues & Expenditures
$60,000
$52,885 $53,144
$50,000
$39,059 $39,452
$40,000 $39,507 $39,026 $38,755 $38,982
$38,849 $38,986
$32,343
$30,000
$27,775
$20,000
$10,000
$-
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
TOTAL REVENUE TOTAL EXPENDITURE
continue.
County Service Area 9 Service & Sphere Review Page 52 of 60
Revenues
Zone E’s primary source of revenue is from Charges for Services. In FY 2023-24, charges
for services totaled approximately $38,000 which represents 99% of the Zone’s entire
revenue stream. Other revenue sources include Use of Money and Property ($359).
Charges for Services
Based on staff’s analysis, benefit assessments have never been increased for the zone.
Table 27 shows the rates during the past decade. The County Board of Supervisors
adopted the same benefit assessment levels for FY 2024-25 on May 14, 2024. Increasing
the benefit assessment rates may help address the anticipated deficit for FY 2024-25 and
future budgets.
Table 27: Charges for Services
FY 2015-16 to FY 23-24 FY 2024-25
Parcel
(Actual) (Adopted)
Single-Family $3.08 $3.08
Multi-Family $1.85 $1.85
Vacant $1.54 $1.54
Expenditures
Zone E’s total expenditures can be categorized into one budgetary group: Services and
Supplies. Table 28 shows that services and supplies continues to represent the zone’s
primary expenditure during the last five fiscal years.
Table 28: Total Revenues & Expenditures
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Revenue from Use of Money & Property
Interest $ 2 30 $ 1 05 $ 9 8 $ 4 4 $ 3 59 $ 1 50
Total Revenue from Use of Money & Property $ 230 $ 105 $ 98 $ 44 $ 359 $ 150
Charges for Services
District Service Charges $ 3 8,717 $ 38,744 $ 38,888 $ 38,832 $ 38,396 $ 38,832
Total Charges for Services $ 3 8,717 $ 3 8,744 $ 38,888 $ 38,832 $ 3 8,396 $ 3 8,832
Miscellaneous Revenues
Other Revenue $ 5 60 $ - $ - $ 1 50 $ - $ -
Total Miscellaneous Revenues $ 560 $ - $ - $ 150 $ - $ -
TOTAL REVENUE $ 3 9,507 $ 38,849 $ 38,986 $ 39,026 $ 38,755 $ 38,982
EXPENDITURE
Services and Supplies
DPW Services-General Money $ 3 2,343 $ 39,059 $ 39,452 $ 52,885 $ 27,775 $ 53,144
Total Services and Supplies $ 3 2,343 $ 3 9,059 $ 39,452 $ 52,885 $ 2 7,775 $ 5 3,144
TOTAL EXPENDITURE $ 3 2,343 $ 39,059 $ 39,452 $ 52,885 $ 27,775 $ 53,144
Surplus/(Deficit) $ 7 ,164 $ ( 210) $ ( 466) $ (13,859) $ 1 0,980 $ ( 14,162)
County Service Area 9 Service & Sphere Review Page 53 of 60
Zone Summary
CSA 9 (Zone E)
California Government Code, section 25210.1 et seq.
Formation
(County Service Area Law)
Board of Directors 5 members, elected at-large to four-year terms
Contact Person Alex Sandoval, Road Superintendent
Employees 2 full-time Public Works employees assigned to Zone E
Facilities N/A
Zone Area Live Oak/Soquel Redevelopment Area (appx. 6 square miles)
Sphere of Influence N/A
Total Revenue = $38,982
FY 2024-25 Budget Total Expenditure = $53,144
Projected Surplus/(Deficit) = ($14,162)
Mailing Address: 701 Ocean Street, Room 410, Santa Cruz CA
95060
Phone Number: (831) 454-2347
Contact Information
Email Address: alex.sandoval@santacruzcountyca.us
Website: https://www.dpw.co.santa-cruz.ca.us/Home/CSAs.aspx
The Board regularly meets on most Tuesdays in the Board of
Public Meetings Supervisors' Chambers, 701 Ocean St, Rm. 525. Meetings
generally begin at 9:00 am.
County Service Area 9 Service & Sphere Review Page 54 of 60
CSA 9 (Zone F)
Zone Overview
CSA 9’s Zone F was formed on May 10, 2016 following action by the County and LAFCO.
The County of Santa Cruz owns four public parking lots in Soquel Village. From 1996 -
2010, maintenance and operation of the lots were financed by the Soquel Village Parking
and Business Improvement Area (SVPBIA). In 2010, Proposition 26 redefined many fees
as taxes and County Counsel determined a business-based assessment fee could be
considered a tax. In 2011, the County terminated the assessment fees and used the
SVPBIA capital fund balance to minimally maintain these parking lots. Those funds were
exhausted, and a new funding structure was needed.
On April 14, 2015, the County Board of Supervisors adopted a resolution requesting
LAFCO to activate CSA 9’s latent powers which would allow the provisions of new
services, specifically:
• Operation and maintenance of street lighting and landscaping services on
County owned or operated properties; and
• Parking enforcement to permit enforcement of time restrictions within County
owned or operated parking lots.
LAFCO approved these latent powers for CSA 9 on May 12, 2015. Following LAFCO
action, the Board of Supervisors officially created a new zone within CSA 9, entitled CSA
9 Zone F (Soquel Village Parking District). Figure 19 on page 56 shows the vicinity map
of Zone F. Appendix 9 provides a copy of the 2016 formation resolution.
Population & Growth
Official growth projections are not available for CSA 9 or its zones. In general,
unincorporated areas in Santa Cruz County are projected to have slow growth over the
next fifteen years. Based on the Association of Monterey Bay Area Government’s 2018
Regional Growth Forecast Report, the current population in unincorporated Santa Cruz
County is approximately 135,000 and is expected to grow by 1% each year. Under this
slow growth model, LAFCO staff projects that Zone F’s population in 2040 will be
approximately 20. The projected population growth for CSA 9’s Zone F are as follows:
Table 29: Projected Population
2020 2025 2030 2035 2040
CSA 9 (Zone F) 19 19 20 20 20
Financial Performance
Zone F was formed in 2016; however, it stopped service delivery and budgeting at the
end of Fiscal Year 2021-22. The zone has remained inactive for over two years now. It is
LAFCO’s recommendation that the County consider dissolving the zone if it does not plan
on using it in the foreseeable future. It is important to note that the dissolution of a zone
is not subject to LAFCO action. Zones of benefit may be created and/or dissolved through
the adoption of a resolution by the County Board of Supervisors. Therefore, the County
should reevaluate the purpose of Zone F and determine whether it should remain in place.
County Service Area 9 Service & Sphere Review Page 55 of 60
Figure 19: CSA 9 (Zone F) Vicinity Map
County Service Area 9 Service & Sphere Review Page 56 of 60
Finances
This section will highlight Zone F’s audited financial performance during the most recent
fiscal years. It is LAFCO’s understanding that Zone F has been inactive since FY 2022-
23. Fiscal Year 2021-22 is the latest audited financial statement available. A
comprehensive analysis of the Zone F’s financial performance during the past five years
is shown in Table 30, on page 58.
At the end of Fiscal Year 2021-22, total revenue collected was approximately $41,000,
representing a 216% increase from the previous year ($13,000 in FY 20-21). Total
expenses for FY 2021-22 were approximately $6,000, which decreased from the previous
year by 88% ($47,000 in FY 20-21). As shown in the figure below, Zone F ended in a
surplus in FY 2021-22. However, the County has stopped providing services under Zone
F since FY 2022-23. No funding has been collected, nor has any budgets been adopted
since then.
Figure 20: Statement of Revenues & Expenditures
$50,000
$47,165
$45,000
$42,813
$41,247
$40,000
$35,000
$30,000
$25,000
$20,000
$17,081
$15,000
$13,072
$10,000
$5,654
$5,000
$- $- $- $- $- $-
$-
FY 2019-20 FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
TOTAL REVENUE TOTAL EXPENDITURE
County Service Area 9 Service & Sphere Review Page 57 of 60
Financial Performance
As previously stated, Zone F was formed in 2016. Table 30 shows the financial
performance of Zone F during its entire existence. During the last six fiscal years, Zone F
experienced an annual deficit when active. Its primary source of revenue was fees from
permits which fluctuated each year.
Table 30: Total Revenues & Expenditures
FY 2016-17FY 2017-18FY 2018-19 FY 2019-20 FY 2020-21FY 2021-22FY 2022-23FY 2023-24 FY 2024-25
(Actual) (Actual) (Actual) (Actual) (Actual) (Actual) (Actual) (Actual) (Adopted)
REVENUE
Licenses, Permits, and Franchises
Road Privileges & Permits $ 3 ,950 $ 3 0,639 $ 3 3,888 $ 1 6,326 $ 1 2,817 $ 4 2,953
Total Licenses, Permits and Franchises $ 3 ,950 $ 3 0,639 $ 3 3,888 $ 1 6,326 $ 1 2,817 $ 4 2,953 $ - $ - $ -
Fines, Forfeitures and Assessments
Parking Meter Fines $ - $ 8 ,868 $ 2 9,253 $ 2 51 $ 3 31 $ (1,572)
Total Fines, Foreitures, and Assessments $ - $ 8 ,868 $ 2 9,253 $ 2 51 $ 3 31 $ (1,572) $ - $ - $ -
Revenue from Use of Money & Property
Interest $ 6 $ 2 32 $ 1 69 $ 5 04 $ (76) $ ( 134)
Total Revenue from Use of Money & Property$ 6 $ 232 $ 169 $ 504 $ (76) $ ( 134) $ - $ - $ -
Charges for Services
Job Cost Billings Only $ 6 ,360 $ - $ - $ - $ - $ -
Total Charges for Services $ 6 ,360 $ - $ - $ - $ - $ - $ - $ - $ -
Miscellaneous Revenues
Other Revenue $ ( 12,528) $ - $ - $ - $ - $ -
Total Miscellaneous Revenues $ ( 12,528) $ - $ - $ - $ - $ - $ - $ - $ -
Other Financing Sources
Operating Transfer In $ 100,000 $ - $ - $ - $ - $ -
Total Other Financing Sources $ 100,000 $ - $ - $ - $ - $ - $ - $ - $ -
TOTAL REVENUE $ 9 7,788 $ 39,739 $ 63,310 $ 17,081 $ 13,072 $ 41,247 $ - $ - $ -
EXPENDITURE
Services and Supplies
DPW Services-General Money $ 1 ,655 $ 69,666 $ 42,028 $ 4 2,813 $ 4 7,165 $ 5 ,654
Total Services and Supplies $ 1 ,655 $ 69,666 $ 42,028 $ 4 2,813 $ 4 7,165 $ 5 ,654 $ - $ - $ -
Fixed Assets
Equipment $ 6 3,201 $ 53 $ - $ - $ - $ -
Total Fixed Assets $ 6 3,201 $ 53 $ - $ - $ - $ - $ - $ - $ -
Other Financing Uses
Operating Transfer Out $ - $ - $ - $ - $ - $ - $ - $ - $ -
Total Other Financing Uses $ - $ - $ - $ - $ - $ - $ - $ - $ -
TOTAL EXPENDITURE $ 6 4,856 $ 69,719 $ 42,028 $ 42,813 $ 47,165 $ 5,654 $ - $ - $ -
Surplus/(Deficit) $ 3 2,932 $ ( 29,980) $ 2 1,282 $ ( 25,732) $ (34,093) $ 3 5,593 $ - $ - $ -
County Service Area 9 Service & Sphere Review Page 58 of 60
Zone Summary
CSA 9 (Zone F)
California Government Code, section 25210.1 et seq.
Formation
(County Service Area Law)
Board of Directors 5 members, elected at-large to four-year terms
Contact Person N/A
Employees 4 full-time Public Works employees assigned to Zone F
Facilities Brommer Yard – 2700 Brommer Street, Santa Cruz CA
Zone Area Soquel Village Area (appx. 0245 square miles or 16 acres)
Sphere of Influence N/A
Total Revenue = $0
Total Expenditure = $0
FY 2024-25 Budget
Projected Surplus/(Deficit) = 0
**Zone F has been inactive since FY 2022-23
Mailing Address: 701 Ocean Street, Room 410, Santa Cruz CA
95060
Phone Number: N/A
Contact Information
Email Address: N/A
Website: https://www.dpw.co.santa-cruz.ca.us/Home/CSAs.aspx
The Board regularly meets on most Tuesdays in the Board of
Public Meetings Supervisors' Chambers, 701 Ocean St, Rm. 525. Meetings
generally begin at 9:00 am.
County Service Area 9 Service & Sphere Review Page 59 of 60
APPENDICES
Appendix 1: LAFCO Comment Letter to Grand Jury (August 8, 2024)
Appendix 2: CSA 9 Formation Resolution
Appendix 3: Countywide Capital Improvement Plan (2020 - 2025)
Appendix 4: Zone A Formation Resolution
Appendix 5: Zone B Formation Resolution
Appendix 6: Zone C Formation Resolution
Appendix 7: Zone D Formation Resolution
Appendix 8: Zone E Formation Resolution
Appendix 9: Zone F Formation Resolution
County Service Area 9 Service & Sphere Review Page 60 of 60
APPENDIX 1:
LAFCO Comment Letter to
County Grand Jury
(August 8, 2024)
Santa Cruz Local Agency Formation Commission
701 Ocean Street # 318D
Santa Cruz CA 95060
Phone: (831) 454-2055
Email: info@santacruzlafco.org
Website: www.santacruzlafco.org
August 8, 2024
The Honorable Judge Katherine Hansen
Santa Cruz Courthouse
701 Ocean Street
Santa Cruz, CA 95060
Subject: LAFCO Response to the Grand Jury’s “Our Water Account Is Overdrawn
– Beyond Conservation: Achieving Drought Resilience” Report
Dear Honorable Judge Hansen:
Thank you for this opportunity to comment on the Grand Jury’s report titled “Santa Cruz County
Local Roads: A smooth path through paradise or a hell of a road.” This report reviewed the current
road conditions in unincorporated Santa Cruz County and requested that the Local Agency
Formation Commission (“LAFCO”) provide comments. LAFCO’s statutory authority is derived
from the Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000 (Government
Code section 56000, et seq.).
Among LAFCO’s purposes are: Discouraging urban sprawl, preserving open space and prime
agricultural lands, efficiently providing government services, and encouraging the orderly
formation and development of local agencies based upon local conditions and circumstances
(Government Code Section 56301). The Cortese-Knox-Hertzberg Act identifies factors that must
be considered, and determinations that must be made, as part of LAFCO’s review of boundary
changes and service reviews. These provisions of law are the legislative basis for LAFCO’s locally
adopted Policies and Procedures Relating to Spheres of Influence and Changes of Organization.
These policies establish guidelines for the Commission and staff to follow. The adopted policies
are available on LAFCO’s website: https://santacruzlafco.org/about/policies-procedures/.
In order to fulfill the request to provide comments on the Grand Jury’s report, LAFCO’s comments
will be based on the direction found in the Cortese-Knox-Hertzberg Act and the Commission’s
adopted policies.
1. Finding (F6): The County of Santa Cruz has failed to perform resurfacing maintenance
on many of the smaller unincorporated local roads, resulting in higher failure rates and
at least a 10 times increased maintenance cost when and if those roads are resurfaced.
DISAGREE: It is LAFCO’s understanding that the County relies on Measure D funds to repair
and maintain publicly accessible roads throughout Santa Cruz County. Based on LAFCO’s
research, the County has completed over 200 road projects (totaling over 44 miles), which
were funded or partially funded by Measure D during the last six years (2018-2023)1. Below
is a breakdown of the completed road projects found on the County’s website:
County Road Projects (2018 – 2023)
Year Road Projects Length (miles)
2018 28 6.56
2019 33 5.59
2020 30 6.26
2021 37 6.44
2022 36 8.31
2023 44 10.88
Total 208 44.04
1
https://cdi.santacruzcountyca.gov/Portals/35/CDI/PublicWorks/Transportation/Completed%20Resurfacing%20Projects%20%282018-2023%29.pdf
LAFCO Response Letter (Grand Jury Report) Page 1 of 2
2. Finding (F10): Minor progress has been made in seeking and securing additional
funding sources. The additional funding is far short of what is needed to maintain and
repair the road network.
PARTIALLY AGREE: It is LAFCO’s understanding that the County has been proactive in
exploring funding opportunities. However, there is a lack of transparency on how these efforts
are initiated, what funding sources are available, and why certain revenues are granted or
denied. It would be beneficial for the County to provide this information on their website to
increase public awareness.
3. Recommendation (R4): The Grand Jury recommends that LAFCO issue a new County
Service Area 9 Service and Sphere of Influence Review incorporating detailed data of
expenditures for each 9D zone by March 15, 2025. (F6, F10).
HAS NOT YET BEEN IMPLEMENTED BUT WILL BE IN THE FUTURE: State law requires
LAFCO to conduct service and sphere reviews at least every five years for each city and
special district in Santa Cruz County, including CSA 9. The last statutorily required analysis
of CSA 9 was completed in August 2020. While the next service and sphere review for CSA
9 is tentatively scheduled for August 2025, LAFCO will move the date to March 2025 to comply
with the Grandy Jury’s request. LAFCO’s regular meetings are typically held on the first
Wednesday of each month. Therefore, LAFCO’s evaluation of CSA 9 and its zones (including
9D) will be considered by the Commission on March 5, 2025. The adopted version of the
report will be sent to the Grand Jury before the March 25th deadline.
I want to thank you once again for the opportunity to comment on the Grand Jury’s recent road
report. LAFCO also develops reports that monitors the efficient and effective delivery of municipal
services by local agencies in Santa Cruz County. These reports are available on LAFCO’s
website: https://santacruzlafco.org/reviews/. I encourage the Grand Jury to review our reports
and continue collaborating with LAFCO on these important issues. Feel free to contact me if you
have any questions. I can be reached by email (joe@santacruzlafco.org) or by phone (831-454-
2055).
Sincerely,
Joe A. Serrano
Executive Officer
LAFCO Response Letter (Grand Jury Report) Page 2 of 2
APPENDIX 2:
CSA 9
FORMATION RESOLUTION
(NO. 693-69)
COUNTY SERVICE
County Service
Highway Safety
Formation
4 1 1)
It it
AREAS 2.-3'75
Area No 9
BEFORE THE BOARD OF SUPERVISORS
OF THE COUNTY OF SANTA CRUZ, STATE OF CALIFORNIA
RESOLUTION No. 726-69
On the motion of Supervisor Cress
Duly seconded by Supervisor Forbus
The following resolution is adopted:
RESOLUTION DISSOLVING STREET
LIGHTING MAINTENANCE DISTRICTS
WHEREAS, this Board has adopted a Resolution of
Intention to dissolve those street lighting maintenance
districts listed on Exhibit "A", attached hereto and made
part hereof, and
WHEREAS, a public hearing has been held on such proposed
dissolution, and no protests were filed at the public hearing,
and
WHEREAS, this Board has established Zone A of County
Highway Safety Service Area No. 9 to take the i)lace and
perform the functions of the street lighting maintenance
districts listed on Exhibit "A".
NOW, THEREFORE, BE IT RESOLVED AND ORDERED that the
street lighting maintenance districts listed on Exhibit "A"
are hereby dissolved, and the Clerk is directed to file a
copy of this resolution with the State Board of Equalization
and the County Assessor.
BE IT FURTHER RESOLVED AND ORDERED that the assets and
functions of said street lighting districts listed on Exhibit "A"
are transferred to Zone A of County Highway Safety Service
Area No. 9.
PASSED AND ADOPTED by the Board of Supervisors of the
County of Santa Cruz, State of California, on the 23rd
day of December 19 69 by the following vote.
AYES: Supervisors Sanson, Forbus, McCallie, Cress and Chairman
NOES - Supervisors None Mello
ABSENT: Supervisors None
ATTEST: TOM M. KELLEY
Clerk of said Board
Approved as to form:
xo-'~ R. Lta=~ I
IF"'-stant County Counsei
Distributio:-~: Co-unty Counsel-
Public Works -
Auditor
I
HENRY J. MELLO
-M~J-rman -5t said-lo-ard
E. Hanna, L~,FCO
EXHIBIT "A"
Aptos Beach Pines Street Lighting Maintenance District
Bear Creek Street Lighting Maintenance District
Broadview Street Lighting Maiatenance District
Boulder Creek Country Club Estates Street Lighting
Maintenance District
Interlochen Street Lighting Maintenance District
Pacific West - Meadow Wood Street Lighting
Maintenance District
Pleasure Point Street Lighting Maintenance District
Roache Street Lighting Maintenance District
Seascape Greens Street Lighting Maintenance District
Santa Cruz Gardens Street Lighting Maintenance District
I
I
i
4
BE'FORE THE BOARD OF SUPERVISORS
OF THE COUNTY OF SANTA CRUZ, STATE OF CALIFORNIA
RESOLUTION NO. 725-69
On the motion of Supervisor McCallie
duly seconded by Supervisor Forbus
the following resolution is adopted:
RESOLUTION ESTABLISHING A SPECIAL TAXING ZONE WITHIN COUNTY
SERVICE AREA NO. 91 1N COMIPTIANCE WITH LOCAL AGENCY FORMATION
i~
COMMISSION RESOLUTION NO. 184 - COUNTY HIC14WAY SAFETY
SERVICE AREA NO. 9
WHEREAS, this Board by its Resolution No. 695-69)
adopted December 2, 1969, declared its intention to establish
a special taxing zone within County Service Area No. 9. and
for that purpose fixed a time and place for public hearing on
said resolution, and
WHEREAS, at the time and place fixed, no protests were
received and the property owners affected urged the establish-
ment of said special zone,
NOW, THEREFORE, BE IT RESOLVED AND ORDERED AS FOLLOWS
1. That Lighting Zone A of County Service Area No. 9
be and it is hereby established.
2. The boundaries of Lighting Zone A shall be as set
forth i ?~'I) 'attached hereto and by this reference
'jx~
made a part hereof.
3. That Lighting Zone A supersedes and assumes all light-
ing services, assets and liabilities of all existing highway
lighting districts and existing service areas with residential
and commercial lighting functions in Santa Cruz County.
4. That the services to be performed in Zone A of the
County Service Area No. 9 shall be the provision and mainten-
ance, through appropriate zones of benefit within County,
Service Area No. 9 of reasonably uniform levels of residential
and commercial street lighting, to be financed by special
taxes upon the taxable property within the zones of benefit.
5. That the Clerk of this Board shall and hereby is
directed to file a statement setting forth the legal descrip-
tion of the said Zone A of Service Area No. 9 with a plat or
map showing said boundaries with the Assessor of the County
of Santa Cr-c.z and with the State Board of Equalization.
--A
PASSED AND ADOPTED by the Board of Supervisors of the
County of Santa Cruz, State of Cali±-ornia, this 23rd day
of December -) 19 69 ~ by the following vote:
AYES: SUPERVISORS Sanson, Forbus, McCallie, Cress and Chairman
NOES: SUPERVISORS None Mello
ABSENT: SUPERVISORS None
HENRY J. MELLO
Chairman ot said Board
ATTEST: TOM M. KELLEY
Clerk of said Board
Approved as to rm:
~ - kq.-~ '
sistai~t Count7ykCounsel
Di-stribution:
County Counsel
Public Works
LAFCO
Assessor
STATE OF CALIFORNIA
COUNTY OF SANTA CRUZ I SS
1, TOM BL KELLEY, County Clerk and ex-officlo
Clerk of the Board of Supervisors of the County of
Santa Cruz, State of California, do hereby certify that
the foregoing is a true and correct copy of a resolution
Passed and adopted by and entered in the minutes of
the said Board.
In Witness whereof I have hereunto set my hand and
affixed the seal of the said Board, on.A&-~19.kz
T,OM XL KELLEY, County Clerk
PoPuty
zorii; "A" OP THH'
SANTA CR'1r;", COU,"ITY
HIGHWAY SAFETY SERVICE AREA
A. SAN LORENZO VALLEY UNIT OF LIGHTING ZONE "A"
Being all of the lands within the exterior boundaries
F1 I of the Lighting Districts and the County Servic~e Areas listed
herein as said Lighting District and County Service Area bound-
aries existed an Soptember 23, 1969:
Parcel 1. Bear Crock Street Lighting Maintenance
District.
Parcel 2. Ben Lomond Highway Lighting District.
Parcel 3. Boulder Creek - Brookdale Highway Lighting
District.
Parcel 4. Boulder Creek Country Club Estates Lighting
Maintenance District.
Parcel 5. Felton Highway Lighting District.
Parcel 6. Boulder Creek Golf and Country Club County
Service Area No. 7.
B. VAVE~IPORT UNIT OF LIGHTING ZONE "A"
Being all of the lands within the exterior boundaries of
the Davenport Highway Lighting District as said district boundaries
existed on September 23, 1969.
C. MID-COUNTY UNIT OF LIGhTING ZONE "A"
Being all of the lands within the exterior boundaries of
the lighting districts listed herein as said lighting district
boundaries existed as of September 23, 1969:
EXHIBIT "A" Description of Zone "A" of the county Highway Safety
Service Area.
14,
.
W
-.
Parcel 1. Last Twin Lakes Highway Lighting District
and Twin ',akes Highway Lighting District.
Parcel 2. Pacific West-Meadowood Lighting Maintenance
District.
Parcel 3. Royal Oak Annexation to Pacific West-
1E,
Meadowood Lighting Maintenance District.
k
Parcel 4. Koopmans Avenue Annexation to Pacific West-
Meadowood Lighting Maintenance District.
Parcel 5. Pleasure Point Street Lighting Maintenance
District and Parcel 2 of Capitola Public
Highway Lighting District.
Parcel 6. Santa Cruz Gardens Street Lighting Maintenance
District.
Parcel 7. Soquel Highway Lighting District and Parcel 1
of Capitola Public Highway Lighting District.
D. APTOS UNIT OF LlGHTlNG ZONE "A"
Being all of the lands within the exterior boundaries
ral
of the Lighting Districts and County Service Areas listed herein
as said Lighting District and County Service Area boundaries
existed on September 23, 1969:
Parcel 1. Aptos Beach Pines Lighting Maintenance District.
Parcel 2. Seascape Greens Street Lighting Maintenance
District and Aptos Seascape County Service
Area.
Parcel 3. Place De Mer County Service Area.
Parcel 4. Sand Dollar Beach County Service Area.
I
11
0 0
BEFORE THE BOAI'D OF SUPERVISORS
OF THE COUNTY OF SANTA CRUZ, STATE OF CALIFORNIA
RESOLUTION NO. 725-69
On the motion of Supervisor McCa I Lie
duly seconded by Supervisor Forbus
the following resolution is adopted:
RESOLUTION ESTABLISHING A SPECIAL TAXING ZONE WITHIN COUNTY
SERVICE AREA NO. 9 IN COMPLIANCE WITH LOCAL AGENCY FORMATION
COMMISSION RESOLUTION NO. 184 - COUNTY HIGHWAY SAFETY
SERVICE AREA NO. 9
WHEREAS, this Board by its Resolution No. 695-69,
adopted December 2, 1969, declared its intention to establish
a special taxing zone within County Service Area No. 9, and
for that purpose fixed a time and place for public hearing on
said resolution, and
WHEREAS, at the time and place fixed, no protests were
received and the property owners affected urged the establish-
ment of said special zone,
NOW, THEREFORE, BE IT RESOLVED AND ORDERED AS FOLLOWS:
1. That Lighting Zone A of County Service Area No. 9
be and it is hereby established.
2. The boundaries of Lighting Zone A shall be as set
forth in Exhibit "A" attached hereto and by this reference
made a part hereof.
3. That Lighting Zone A supersedes and assumes all light-
ing services, assets and liabilities of all existing highway
lighting districts and existing service areas with residential
and commercial lighting functions in Santa Cruz County.
4. That the services to be performed in Zone A of the
County Service Area No. 9 shall be the provision and mainten-
ance, through appropriate zones of benefit within County
Service Area No. 9 of reasonably uniform levels of residential
and commercial street lighLing, to he financed by special
taxes upon the taxable property within the zones of benefit.
5. That the Clerk of this Board shall and hereby is
directed to file a statement setting forth the legal descrip-
tion of the said Zone A of Service Area No. 9 with a plat or
map showing said boundaries with the Assessor of the County
of Santa Cruz and with the State Board of Equalization.
A . I
" 4 It
PASSED AND ADOPTED by the Board of Supervisors of the
County of Santa Cruz, State of California, this 23rd day
of December_, 19 69 2 by the following vote:
AYES: SUPERVISORS Sanson, Forbus, McCallie, Cress and Chairman
NOES: SUPERVISORS None Mello
ABSENT: SUPERVISORS None ff A .4
ATTEST:
Approved as to rm,
~ - AOLA~ *
sistai~t Count:yCouns-el
Distribution:
County Counsel
Public Works
LAFCO
Assessor
ro
....................
4W
_A,
BEFORE THE BOA-RD OF SU~~ERVISORS
OF THE COUNTY OF SANTA CRUZ, STATE OF CALIPOPNIA
RESOLUTION NO. 695-69
on the motion of Supervisor Forbus
duly seconded by Supervisor McCallie
the following resolution is adopted:
RESOLUTION OF INTENTION TO ESTABLISH A
SPECIAL TAXING Z014E WITHIN COUNTY SERVICE
AREA NO. 9 IN COMPLIANCE WITH LOCAL AGENCY
FORMATION COMMISSION RESOLUTION NO. 184
COUNTY HIGHWAY SAFETY SERVICE AREAL NO. 9
WHEREAS, a Resolution Initiating Proceedings for the
Formation of a County Service Area for Street and Highway
Lighting and for Highway Safety Programs in the County of
Santa C~uz was heretofore file d with the Executive Officer
of the Local Agency Formation Commission, and
WHERELS, the Local Agency Formation Commission, by
Resolution No. 184 - LAFCO, approved said formation.
NOW, THEREFORE, BE IT RESOLVED AND ORDERED:
1. That preliminary proceedings for formation were
commenced by a Resolution of the Board of Supervisors of
Santa Cruz County, filed with the Executive Officer of the
Local Agency Formation Commission of the County of Santa
Cruz.
2. That the Special Taxing Zone proposed to be formed
has been given the short form designation of "Lighting Zone
"A" of County Highway Safety Service Area No. 9", the
exterior boundaries thereof are described in Exhibit "A"I
attached hereto and by this reference made a part hereof.
3. That the reason for the formation of said Lighting
Zone "A" of said County Service Area No. 9 is that the territory
can be benefited by the following extended services:
-I-
0
A. The provision and maintenance, through appropriate
zones of benefit within County Service Area No. 9
of reasonably uniform levels of Residential and
Commercial Street Lighting, to be financed by special
taxes upon the taxable property within the zones of
benefit.
4. The proposed Zone "A" of said Service Area No. 9
will provide a reasonably uniform level of lighting service
and maintenance at a uniform tax rate upon taxable property
within said Zone "A".
5. The proposed Lighting Zone "A" of County Service
Area No. 9 is to supersede and assume all lighting services,
assets and liabilities of all existing Highway Lighting Districts
and existing Service Areas with residential and commercial
lighting functions in Santa Cruz County.
6. That Tuesday, the 23rd day of December , 1969,
at the hour of 11: 30 A.M. , the Board of Supervisors Meeting
Room, Governmental Center, Santa Cruz, California, is hereby
fixed as the time and place for a public hearing on the
proposed formation.
7. The proposed formation shall be in conformance with
the terms and conditions contained in Resolution No. 693-69
of the Board of Supervisors of Santa Cruz County forming said
Service Area No. 9.
8. That any interested person desiring to protest against
said formation, shall do so by written communication filed with
Tom M. Kelley, County Clerk of Santa Cruz County and ex-officio
Clerk of the Board of Supervisors, not later than the hour
-2-
0
0
fixed for the hearing. A written protest by a landowner shall
contain a description sufficient to identify the laqd owned by
him; a protest by a voter shall contain the residential address
of such voter.
9. That the Clerk of this Board shall post and publish this
resolution as notice of saidhe4rj"ftg as required by law.
(Government Code§§ 6066, 56083-56089)
PASSED AND ADOPTED by the Board of Supervisors of the
County of Santa Cruz, State of California, this 2nd'
day of December , 1969, by the following vote:
AYES: SUPERVISORS Sanson, Forbus, McCallie, Cress &*Chairman Mell
NOES: SUPERVISORS None
ABSENT: SUPERVISORS None
HENRY J. HELLO
Chairman of said Board
ATTEST: TOM M. KELLEY
Clerk of said Board
Approved as to form:
STATE OF CALIFORMA ] Sg
COUNTY OF SANTA CRUZ
L TOM hL KELLEY, County Clerl? obd eX-ofW4
Clerk of the Board of Snpervisors of the County of
Santa Cruz, State of Cal'Ifornia, do hereby certify that
the foregoing is a true and correct copy of a resolution
Passed and adopted by and entered in the minutea of
the said Board.
In Witness whereof I have hereunto set my hand and
affixed the Se'ralme said Board, on '&§'. 5, -,19-&
TOM 1vL KELLEY, County Clerk
BY Deputy
1W, RD OF SUPERVISORS
OF 114E C:.'X1N11, ~;11 IT-, IRUZO STATE OF CALIFORNIA
'-' C ' !iO.
693-69
~~ the of Supervisor McCallie
du-ty sec Y~ ad by Supervisor Forbus
the fo'kl~ ..g resolution in adopted:
_0 L~ ~,LISHING COUNTY HIG%W.Y
j E fy -VIC& ARFA NO. 9
a Reaclution lz~itiating Proceedings for the
stinii of a Counq F!ervic rea for Street and Highvay
aq,` for Ht-hut-v Programs in the County of
ut:~ we s here to fore ft with the Executive Officer of
_xt~sl ;~j4,ency Formation C. ~--ission, and
the, Local ""i-evey Formation Commission, by
rirn No~ 184 - 14~- ~,,i.~rovod said formation, and
HE 71 b,~ .:~g Resolution No. 616-69,
ti~ANs this Bcard, I
s4o-,,ttid, 28, 1969, decl.,_,red its intention to establish
s coiis,.ty service area in a area of the unincorporated
.,~ r~ ~ ~
-,,ory of quanta Cruz Coun,,- , and with proper notice, set
1-jec;%f, Dsceraber 2, IW,, or i~:30 A.M.0 as the date for
~i,"ririg on said matter, and
'? I
,~ LSR;_AS, the hearing wa# ;,.old at the time and place fixed,
end ao -rotests were received.
N0W V THEREFORL V 811!1~
I., ',~aat the M,.8rd
Califo-nLa, does h,
the M1-'hsw3V
I
IT AND ORDEREDt
of 1_~_%-rvisors of Santa Cruz County,
ereby -~ declare and determine that
,'afet,4 -'service Ares. No. 9 be and it
'qerEbv is establis~%ed~
llzat the bozia-jrries County Ifighwy Safety Service
A-ec No. 9 oe ~:s forth in exhibit "A", attached
aerZ~41; a-J by this refer.-r;cti made a part hereof.
4,
0
BE IT FURTHER RESOLVED AM ORP=0~~toqOe tki sorvi;4n to be
perfor d in Ccunty Highway rvici,Aroa, Md. 9 - ar.*
follp":
A. The provision and maintenans* of, ULghway ftioty'-~~
Lighting and related electrical and. traffic, &CtU4ti4M' , 4"i
signs, signals and traffic
B. The provision and maintonancow'- thro"'h =116 to
zones of benefit within the propos*ii-Colinty %V
Are#, reasonably uniform levels of Residential A"
Commercial Street Lighting, and/or-the eStabUshmiant
and operation of Special Highway Misty Pro kat all
to be financed by specistuxes up" the t4m"Te
property within the vatia" zones of benefit
31'~ IT FURTHER RBSOLV-~', AND ORDERED that the d1srk of this
Boaxd shall and hereby is directed to to
1. File a proper Certificate *f~'Cq"l*tiCM1VLih thi.~z
oacretary of 03tate.
2. Record a copy of use Secretary of State's !PFtif icate
along with a copy of said Cortificateof Completion WIXh
the Recorder of Santa Oten C 6unty.
3. File a statement sotting,fortA th*,.l*%*,VA*scr
14-
'I-
of the Service .- -rea with: a plat or, mikp sh**'*, sAid',
boundaries, with the Assessor of '~hordonntyl-- ',Sania~,
) ko~11'11~
t.ruz and with the E(-ato Board of R46alization.
PAI'~'SED AND ADOPTLD by the Boartllof,.~;Mporyisotsaf the'County
of Santa Cruz, State of ~;jlifornia~, ttas:t 4" of
oecember, 1969, by the following votot
PYES: supEqvI,,~,,cj%s Sanson~ Forbus,,.MbCallie, Cress and Chairman,Melloi
NOES; ,;UPERVISOR$ None
ABSENT: SUPERVISORS None
MELL014Z.-,.)'~'
HEAhY J.
P,
the RT Vko:
A rr-Z'ST TOM M. KELLEY
CIO of said Board. fo..'
DISTRIBUTION: County Counsel
Public VIcrl-s
IAFCO
Ap-,iroved as to form:
a L. Rankin
tamnst- County sel.
AINS!
4".
V
:z"
BEFORE rHE BOARD OF SUPERVIsm
OF THE COUNTY OF SANTA CRUZ, STATE OF GA
?1LS()WT1(:-i NO. 616-69
On the inotion of Supervisor Forbus~..,
d,aly seeonded by Supervisor SsnsoWl"
thk% fol.iowing resolution is adopted:
RESOLUTION OF INTSM"ION TO ESTABLISH A
COUNTY SEX 'VICE P,.Rr%A IN compLumer.,wiTH
ICV41. AIGI~~NCY FORIMATION COMMISSIOP.,
NO. 184 -- COUNTY HIGHWY
9A. F!- TY SERVICE AREA NC. 'q
WHEREAS, a Initiating Proceedings for tjzj:~~
F-1,-ns4tion of a County Ser-,ilee Area for Street and Highway
U,1~1-,~~,inj and for Ei:~,hway Sz~-Eety Programs the Cmu#y of
S~arita cruz was heretcfcre ftled with the'-Mcecutivo Ofticer
local Agency
-~n CoMiSSioaq end
1-1HIly-PAS, the Loccl Ajerwy Formation Commission by
'R.esoluticn No. 184 approved said formations
1: XESOLVED AND ORDERED:
1. That pr.-IiniaLry nroceedings for,formation were
cr-raenceed by a ResinlLitio-, of the Boa" ~of Supervisors of
nta Cruz County, filei v!ith the 1,Xecutive Officer-*f the
!ncnL ..agency Format4on ~.,omiissionr of the Co ty of.Santa
Me
2. That the courst., ~~ervice area proposed to be. formed ins
becn. :01'Ven the 3~,~;rt 'form designation: of :"Cqunty- Nighway safety
,~z~rvice Area No. tile exterior boundaries thereof are
described in Exhit,it ilkl' . attached hereto and by this
ference made a ~-.rr hereDf.
3. That the :eqs~,-In -or the formation of oi~ld county service
aree 4-s that the lcerrit.~~'L-y can be benefited by the foiloving
extent~ed servicet;
A. The provision and maintenance Of Highway Safety
Lighting and related electrical and traffic actuated
signs, signals and traffic safety devices.
3. The provision and maintenance, through appropriate
zones of benefit within the proposed County Service
Area, reasonably uniform levels of Residential and
Commercial Street Lighting, and/or the establishment
and operation of Special Highway Safety Programs, all
to be financed by special taxes upon the' taxable
property within the various zones of benefit.
4. That Tuesday, ttj~? 2nd day of
December
1 19699
at the hour of 11:00 -A *M.0 in the Board of Supervisors
Meeting Room, Governmental Center, Santa Cruz, California,
is hereby fixed as the time and place for a public hearing on
the proposed formation.
4
5. The proposed formation shall be subject to the terms
and conditions contained in the Resolution No. 184 of the Local
Agency Formation Commission.
6. That any interested person desiring to protest against
said lormation, shall (;o so by written communication filed with
Torn M. Relley, Coiinty Clerk of Stnta Cruz County and ex-officio
Clerk of the Board of I-'Iu!.3ervisorx, not later than the hour
fixed for the hearina. A written protest by a landowner shall
contain a descriotion wa-4~ficient to identify the land owned by
him; a protest by a voter, shall contain the residential address
of such voter.
7. That the Clerk of this Board shall post and publish this
resolution as notice ol said hearing as required by law.
(0overnment Code S'§6066, 56083-56089)
PASSED AND ADOPTED by the Board of Supervisors of the
County of Santa Cruz, State of California, this 28th
day of October 1969, by the following vote:,
AYSS: SUPERVISORS Sanson, Forbus, McCallie, Cress & Chairman Mello
NOES: SUPERVISORS None
AB6ENT: SUPERVISOJLS None
HENRY J. MELLO
Chairman,of'said 304rd
A-rTEST: TOM M. KELLEY
Clerk of said ?,oard
Approved as to form:
/a/ Jvues L. R nkin
James L. Rankin, Assistant County
Counsel
DISTRIBUTION: County Counsel
Public Works
1AFC0
STATS OR C~XMR)RMMJ'~ in
A
COUNTY OF SAd4TA CRX
County Uwe no
It U
1, TOM NL kE=Y, at the County of
C.1erlt oj t1je Board of S,
he f jwl'utton
tl
~;anta Cruz, state of Caufoni, do iierebY 900ft that
nis' do h
sai oard. on S~
the f0re,going is R true and cormOt COPY Of n Of
UN
a or
e: eat C
d ?
- Mg I
passed and gdoptted by and entered in the Minutes
0 tfl
v, hereun
: terea tj
he WJ BORr(L
b an
-0 (A 1 have hereunto set my bned and
H
a
d
%,,%~n~ss whem
id B
S
a
t, seal ot'tLe sa Board
Tom TvL KELLEy, county Clerk
Deputy
By
3
L
BEFORE THE BOARD OF SUPERVISORS
OF THE COUNTY OF SANTA.C RUZ, STATE OF CALIFORNIA
RESOLUTION NO. 542-69
On the motion of Supervisor Forbus
duly seconded by Supervisor Sanson
the following resolution is adopted:
RESOLUTION INITIATING PROCEEDINGS FOR THE
FORMAT10N OF A COUNTY SERVICE AREA FOR STREET
AND HIGHWAY LIGHTING AND FOR HIGHWAY SAFETY
PROGRAMS
WHEREAS, a letter signed by Supervisors Mello and, Forbus
has been filed with this Board requesting the initiation of
proceedings to form a County Service Area in Santa Cruz
County for the purpose of providing and maintaining Highway
Safety Lighting, appropriate levels of Residential and
Commercial Lighting and Special Highway Safety Programs
through appropriate zones of benefit with the proposed County
Service Area, in accordance with Section 25210.1 of the
Government Code, and
WHEREAS, the boundaries of this proposed County Service
Area have been approved by the Local Agency Formation Commission
at its meeting of October 18, 1968.
NOW, THEREFORE, BE ITRESOLVED AND ORDERED that application
is hereby made to the Local Agency Formation Commission for the
formation of a County Service Area, in accordance with Section
25210.1 et seq of the Gcvernment Code, to perform the following
extended services:
1. The provision and maintenance of Highway Safety
Lighting and related electrical. anci traff4r. pf- a
signs, signals and traffic safety devices.
2. The provision and maintenance, through appropriate
zones of benefit within the proposed County Service
Area, reasonably uniform levels of Residential and
Commercial Street Li.ghting, and/or the establishment
and operation of Special Fighway Safety Programs, all
to be fin -.tced by special ta-<es upon,-~y- taxable property
0 0
within the various Zones of Benefit.
BE IT FURTHER RESOLVED AND ORDERED that the proposed
boundaries for this proposed County Service Area include all
of the territory within Santa Cruz County, excepting therefrom
the lands lying within the incorporated cities of Capitola,
Santa Cruz, Scotts Valley and Watsonvtlle.
PASSED AND ADOPTED by the Board of Supervisors of the
County of Santa Cruz, State of California, this _23rd day
of September, 1969, by the following vote:
AYES: Supervisors Sanson, Forbus, McCallie and Chairman Mello
NOES: Supervisors none
ABSENT: Supervisor Cress
HENRY J. AJ~LO
Chairman of the Board
ATTEST: TOM M. K-,,'LL-]Y
Clerk of the Board
DISTRIBUTION: County Counsel
IAFC
Public Works
Approved as to form:
NAmes L. Rankin
~;sistant Count~ Counsel
.11 .. . .............
OTATE OF CALIFORNIA SS
LDUNT 5~ OF SANTA CRUZ I
I WOM K KLLLEI" County
nerk _ Clerk and ex-officio
of the 1303rd of Supervisors of the County of
Batts Cruz, Sinte
tfie fo Of do h,reby certify that
re%olng is a true 11311 correct copy of a
Passed and resolution
the 6ald Boarti. -d bY Mid entered in the mi,n,tes of
Im Witz"SS Whereof I have hereunto get my hana hod
affixed tile seal Of the said Board, on 4? -
TO"'I ~ 9-Lf
1 -7~1- KELLEY, County Clerk
'y- I -
D
t---"
of hr--reir -as said District bou'-."-
aries ex1ote"' on 23, I)G3:
Parcel 1. Freedo-ni 11igh:.1ay Lighting District, anel
Parcel I..os. 2, 3, 4, 6 and 7 of Broadvie~.-,'
Street Lighting Maintenance District.
Parcel 2. Parcel 1 of Broadview Street Lighting Main-
tenance District.
Parcel 3. Being all of the lands lying within the
exterior boundaries of the Manfre Road
Annexation to the Broadview Street Lighting
Maintenance District.
Parcel 4. Parcels 1 and 3 of the-Interlochen Street
Lighting Maintenance District and the follow-
ing described lands lying between said
Parcels 1 and 3; being all of the lands*shown
on the map of Tract No. 505 Crestwood Heights
Subdivision No. 4.
Parcel 5. Being Parcel 5 of the Broadvie~w Street
Lighting Maintenance District.
Parcel 6. Being all of the land's as sho-an on the
map of Tract 433,.Sunny Meadows Subdivision
No. 1.
Parcel 7. Being all of the lands as shown on the map-.
of Tract 272, Corrala Vista Subdivision
No. 1; Tract 419, Corrala Vista Subdivision
No. 2 and Tract 473 Corrala Vista Subdivision.
No. 3.
Parcel Being Parcal 2 of the Int-arlochen Str zi-t
Lighting 'Maintenance Dist-Ect.
Excluding'therefrom any portion of the foregoing Light-
ing Districts within the boundaries of the Cities of Ca?itala,.San~ta
Cruz and Wats_--ville as said City boundaries existed on September
23, 1969.
ZONE "A" OF THE
SANTA CRUZ COUNTY
HIGHWAY SAFETY SERVICE AREA
A. SAN LORENZO VALLEY UNIT OF LIGHTING ZONE "A"
Being all of the lands within the exterior boundaries
of the Lighting Districts and the County Service Areas listed
herein as said Lighting District and County Service Area bound-
aries existed on September 23, 1969:
Parcel 1. Bear Creek Street Lighting Maintenance
District.
Parcel 2. Ben Lomond Highway Lighting District.
Parcel 3. Boulder Creek - Brookdale, Highway Lighting
District.
Parcel 4. Boulder Creek Country Club Estate S Ti
L ghting
. Maintenance District.
Parcel 5. Felton Highway Lighting District.
Parcel 6. Boulder Creek Golf and Country Club County
Service Area No. 7.
B. DAVENPORT UNIT OF LIGHTING ZONE "All
Being all of the lands within the exterior boundaries of
the Davenport Highway Lighting District as said district boundaries
existed on September 23, 1969.
C. MID-COUNTY UNIT OF LIGHTING ZONE "All
Being all of the lands within 'the exterior boundaries of
the lighting districts listed herein as said lighting district
boundaries existed as of September 23, 1969:
EXHIBIT "A"
Service Area.
Description of Zone "A" of the County Highway Safety
Parcel 1- East Twin Lakes Highway Lighting District
and Twin Lakes Highway Lighting District.
Parcel 2. Pacific West-Meadowood Lighting Maintenance
District.
Parcel 3. Royal Oak Annexation to Pacific West-
Meadowood Lighting Maintenance District.
Parcel 4. Koopmans Avenue Annexation to Pacific West-
Meadowood Lighting Maintenance District.
Parcel 5. Pleasure Point Street Lighting Maintenance
District and Parcel 2 of Capitol a Public
Highway Lighting District.
Parcel 6. Santa Cruz Gardens Street Lighting Maintenance
District.
Parcel 7. Soquel Highway Lighting District and Parcel 1
of Capitola Public Highway Lighting District.
D. APTOS UNIT OF LIGHTING ZONE nA"
Being all of the lands within the exterior boundaries
of the Lighting Districts and County Service Areas listed herein
as said Lighting District and County Service Area boundaries
existed on September 23, 1969:
Parcel 1. Aptos Beach Pines Lighting Maintenance District.
Parcel 2. Seascape Greens Street Lighting Maintenance
District and Aptos Seascape County Service
Area.
Parcel 3. Place De Mer County Service Area.
Parcel 4. Sand Dollar Beach County Service Area.
SANTA CRUZ COUNTY
II1GII',','AY SAFETY SERVICE AREA
Being all of the lands within the exterior
boundaries of the County of Santa Cruz, exceoting there-
from all of the lands within the exterior boundaries of
the Cities of Capitola, Santa Cruz, Scotts Valley and
Watsonville as said City boundaries existed on September
23; 1969.
EXI*EIBTT "A" -
c r n o f t- rke C 0 u n ~- v F '...I a S a f ,- t y S c r c
b
RESOLUTION NO. 136
On the motion of Commissioner Mello,
duly seconded by Commissioner Haber,
the following resoluLion is adopted:
RESOLUTION OF THE LOCAL AGENCY FORMATION
COP24ISSION OF THE COUNTY OF SANTA CRUZ
ON CONSOLIDATION OF LIGHTING DISTRICTS.
WHEREAS the Local Agency Formation Commission of the
County of Santa Cruz has heretofore requested, received, and
duly considered reports, recommendations, and comments on the
Consolidation of Lighting Districts in Santa Cruz County; and
WHEREAS said Local Agency Formation Commission finds that
the public and private interests in Santa Cruz County could
better be served through consolidation of the multiplicity of
exi'sting lighting district - s into a zone of benefit of a single
county service area, thereby making possible a.more uniform
level of service and distribution of benefit, accomplished by
a coordinated highway safety lighting program;
NOW, THEREFORE, BE IT RESOLVED Py the Local Agency Formation
Commission that the Board of Supervisors be, and it hereby is,
requested to initiate proceedings~toward consolidation of all
lighting districts into a zone of benefit of a.county service
area established for the purpose of providing street and highway
safety lighting; that said service area encompass all of Santa
Cruz County except lands lying within the boundaries of the
incorporated cities; that said consolidation take place with due
consideration given to the aforesaid Wilson-Starrs Report and
accompanying comments of county departments; and that the
Executive Officer of this Commission be and he hereby is, dir-
ected to transmit a copy of this Resolution along with copies
of all reports, comments, and recommendations in the Commission
files pertaining to said consolidation to the Santa Cruz County
Board of Supervisors.
PASSED AND ADOPTED this 16th day of October, 1968, by the
following vote:
AYES: Commissioners Mello, Haber, Burton, and Lappin.
NOES: Commissioners None.
A13SENT: Contmissioners Hall and Fleming.
IFI-7
ROBERT E. BURTON, Ch irman
la
ATTEST:
E. R.-HANNA, Executive Officer
Dist.: Planning Dept.
Auditor
Sentinel
Register-Pajaronian
2
CONSOLIDATION OF LIGHTING DISTRICTS
PROGRAM
It is proposed that all the Special Lighting Districts
be consolidated into Special Taxing Zone "A" of the County
Highway Safety Service Area. For the purpose of convenience,
Zone "A" has been separated into five geographical units desig-
nated as:
A. San Lorenzo Unit
B. Davenport Unit
C. Mid-County Unit
D. Aptos Unit
E. Pajaro Unit
Within these units, the existing Lighting Districts
and County Service Areas have been combined into separate parcels
with districts having common boundaries being consolidated. This
has resulted in 22 Special Lighting parcels instead of the former
30, and an additional 2 new parcels are proposed as petitioned by
the property owners. As areas requesting street lighting develop,
further consolidation will result.
Lighting within the newly created Special Lighting
Zones would be paid for by the property owners within the Lighting
Zones. Lights within these areas which are classed as Highway
Safety Lighting would be paid for by the County Highway Safety
Service Area.
Future requests for street lighting would be handled
by annexation to one of the units of Special Taxing Zone "A".
COUNTY HIGHWAY SAFETY SERVICE AREA
PROGRAM
iNTRODUCTION
The growth in the unincorporated areas of Santa Cruz
County has increased the need for urban services, including
lighting. The need has been fulfilled by the establishment of
Street Light Maintenance Districts, Highway Lighting Districts,
or County Service Areas which include street lighting as one of
the services.
GENERAL
There are now eighteen (18) Lighting Districts in
Santa Cruz County and three (3) County Service Areas which in-
clude lighting as one of their services. Some of the Districts
have two or more non-contiguous areas. Each of the districts
has a different tax rate and the rates have different bases.
The consolidation of the Special Lighting Districts
will result in the following benefits:
1. One uniform tax rate for all of the special lighting
areas in the County receiving a reasonably uniform
level of service-
2. A uniform tax base.
3. Reduction of the number of Lighting Districts with
further reductions possible as lighting demands
increase.
4. The creation of uniform lighting standards which will
-1 -
be the subject of another report to be prepared
by the County Planning Department.
All of the above will ultimately reduce costs for
accounting, mapping and administration.
PURPOSE
The purpose of a County Highway Safety Service Area
is to promote the safe and orderly movement of traffic by
installation of electrically operated traffic control devices
and by artificially illuminating certain features or conditions
which are unusual requiring additional care and alertness to
negotiate and which, if artificially illuminated, may be more readily
comprehended and so compensated for by the motorist. Special
Highway Safety programs would be an additional purpose of the
Service Area.
PROPOSAL
The proposal is for establishment of a County Highway
Safety Service Area for the purpose of providing and maintaining
all types of street and hig4way lighting safety devices, and
jhway safety programs on the public roads in the unincorpor-
ated area of Santa Cruz County.
Extended services for which the Service Area is formed
are".
1. To provide and maintain highway safety lighting and
related electrical'.and traffic actuated signs,
signals and traffic safety devices.
6
I
00
00
2. To provide and maintaln, through a Zone of Benefit
within the Service Area, a reasonably uniform level
of residential and commercial street lighting to
be financed by a special tax upon benefiting tax-
able property within such Zone.
3. To provide and maintain, through Zones of Benefit
within the Service Area, special street and high-
way lighting where a substan tially higher level
of service is requested by the landowners therein,
or for special Highway Safety programs to be financed
by a special tax upon benefiting taxable property
within such zones.
DEFINITION
County Highway Safety Service Area facilities will
include, but not be limited to the following: Electrically
operated highway luminaires, traffic signals, flashing warning
signals, railroad warning signals and devices and illuminated
traffic signs.
GENERAL
The program has been based upon the concept that all
existing facilities presently within Lighting Districts and/or
installed upc-a roads meeting the warrants for Safety Lighting
W Ul be taken -nto the County Highway Safety Service Area.
.En addition, those existing facilities that are below
standards will. be upd,,ted' to the illuminatior levels as indicated
c-n the mrap of the proposed program.
The entire cost for the installations and maintenance
will be assessed to the County Highway Safety Service Area with-
out split-benefit provision.
Highway Safety Lighting will normally be placed on
Arterial and Collector streets and roads in the County Road
System which have attained average daily traffic (ADT) levels
commensurable with the following:
Urban areas 5,000 ADT
Rural areas 3,000 ADT
In addition, Highway Safety Lighting may also be con-
sidered for placeivent at such other locations as is deemed
necessary to promote traffic safety and which fulfill Highway
Safety Lighting warrants.
WARRANTS
Highway Safety Lighting may be warranted if one or
more of the following conditions are met.
1. Channelized intersections.
2. Intersections where traffic signals are installed
or warranted.
3. Intersel-tions where three or more night accidents
have occurred within a one-year period susceptible
to correction by increased level of illumination.
4. Pedestrian crosswalks where 50 percent of the
normal hourly day pedestrian volume is equalled or
exceeded during a night hour and where street light-
ing is not present.
-4-
00 *0
5. At locations where a combination of sight distance,
alignment, grade, channelization or other factors
constitute a confusing or unsatisfactory condition
if not illuminated.
6. Railroad Crossings.
7. Tunnels, underpasses and pedestrian over and
underpasses.
8. Entering and exiting ramps of State Freeways.
(Unless otherwise specified, installations on
these facilities will normally be placed by
State subject to agreement with County.)
SANTA CRUZ COUNTY
HIGHWAY SAFETY SERVICE AREA
Being all of the lands within the exterior
boundaries of the County of Santa Cruz, excepting there-
from all of the lands within the exterior boundaries of
the Cities of Capitola, Santa Cruz, Scotts'Valley and
Watsonville as said City boundaries existed on September
23, 1969.
-6-
EXHIBIT "T~" - De-iption of the County Rig Safety Service Area
00 00
Initial Program
RAILROAD CROSSINGS
Safety Lighting Locations
1. Thirtieth Avenue
2. Seventeenth Avenue
3. Seventh Avenue
4. Mar Vista Avenue
5. State Park Drive
6. Trout Gulch Road
7. Clubhouse Drive
8. Spring valley Road
9. Buena Vista Road
10. Highway One - Davenport
11. Highway Nine -,t Rincon
12. Graham Hill Road
Railroad Crossing Lighting Standards
1. At least two luminaires, one each side of crossing
on unlighted roads.
2. Unless otherwise specified, 400 watt luminaires will
be installed.
3. Where road or street is already lighted, crossing
will be illuminated at least one size larger than
remainder of lights on road.
4. Distance from outside of tracks to luminaires should
not exceed 75 feet.
-7-
so
90
Arterial & Collector Roads
Exceeding A. D. T. Safety Lighting Warrants
(3000 A. D. T. Rural - 5000 A. D. T. Urban)
1. Bear Creek Road - Highway 9 east I mile.
2. Center Street - State Park Drive to Spreckles Drive.
3. Park Avenue - Soquel Avenue to Highway I
4. Spreckels Drive - Treasure Island Drive - Aptos Beach Drive - Soquel Drive to
Esplanade.
5. Trout Gulch Road - Soquel Drive to Catherdral Drive,
6. Rio Del Mar Boulevard - Highway 1 to Esplanade.
7. Freedom Boulevard - Soquel Drive to City Limits Watsonville.
S. Green Valley Road - City Limits of Watsonville to Casserly Road.
9. Holohan Road - Green Valley Road to High-way 52.
10. Mt. Hermon Road - City of Scotts Valley to Highway 9.
11. Graham Hill Road - City of Santa Cruz to Mt. Hermon Road.
12. Porter Street-Soquel to Highway 1.
13. Soquel San Jose Road - Soquel Drive to Hilltop Road,
14. Soquel Drive - Soquel Avenue to Freedom Boulevard.
15. Forty-First Avenue- Soquel Drive to Highway L
16. Forty-First Avenue - Capitola City Limits to East Cliff Drive.
17. Soquel Avenue - Santa Cruz City Limits to Seventeenth Avenue.
18. Capitola Road - Sant~ Cruz City Limits to Capitola City Limits.
19. Eaton Street - SquitP Cruz City Limits to Seventeenth Avenue.
20. Seventeenth Avenue - Soqucl Avenue to East Cliff Drive.
21. Portola Drii Seventeenth Avenue to Capitola I* Limits.
2 2. East Cliff Drive - Lake Avenue to Seventeenth Avenue.
I
so
00
23. Seventeenth Avenue
24. State Park Drive
25. Airport Boulevard
26. Amesti Road - from
27. Brommer Street - f
City Limits.
- Soquel Avenue to Portola Drive.
Soquel Drive to Center Street.
- Highway 1 to Freedom Boulevard.
Green Valley Road to Pioneer Road.
rom Seventh Avenue to Capitola
State Conventional Highways
Highway 9 - San Lorenzo Avenue in Felton to Bear Creek
Road in Boulder Creek.
Highway 236- Boulder Creek at Highway 9 west 1 mile.
Highway 152- City Limits of Watsonville to Carlton
Casserly Road.
Highway 1 - City Limits of Santa Cruz north to Davenport.
Highway 17 - City Limits of Scotts Valley to County Line.
-9-
00
STANDARDS
ft
Highway Safety Lighting installations will be placed
in accordance with the American Standards Association and the
Illuminating Engineering Society's minimum standards as followed
by the Pacific Gas and Electric Company and the illumination level
criteria as set forth as follows: Four-lane roadways, 21 M lumen,
400 Watt luminaires. Two-lane roadways, 11-M lumen, 250 Watt
luminaires. Luminaires shall be equipped with photo cell actua-
tion devices. Unless otherwise specified by the Director of
Public Works, luminaires shall be installed upon wood poles pro-
vided by the Utility Company at mast heights of 28 to 30 feet.
The location and number of luminaires at intersections
will be in accordance with the attached standard intersection
sheet. The Utility Company may modify the position and spacing
to conform to equipment features and conditions subject to review
by 'the Department of Public Works.
The ownership of all street lighting facilities installed
by the Utility Company shall be vested in said Utility Company and
all. relocation, replacement and maintenance of said facilities
shall be in accordance with the Utility Company's Rules and
Regulations as filed with the Public Utilities Commission.
APPENDIX 3:
COUNTYWIDE CAPITAL
IMPROVEMENT PLAN
(2020 TO 2025)
2020/21 Capital Improvement Program
County of Santa Cruz
5-Year Capital Improvement Program Summary for
Roads, Drainage, Sanitation, Flood Control,
Roadside Betterments, Parks and County Facilities.
Summary of Identified Capital Improvement
Projects Needed at Build-Out of the County’s
General Plan.
Prepared by the Department of Public Works in conjunction with the
County Administrative Office and the Planning Department.
Photo: LEO's Haven Playground at Chanticleer County Park. Photo credit to Diev Hart.
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEAR 2020/21
The 2020/21 Capital Improvement Program was compiled by the
County Department of Public Works in conjunction with the County Administrative Office
and the Planning Department.
Capital Improvement project information was also provided by the Health Services Agency,
Probation Department, Sheriff’s Office, General Services, Agricultural Commissioner
and Parks, Open Space and Cultural Services.
Electronic copies of this document are available on the Public Works website located at
http://dpw.co.santa-cruz.ca.us
The content of this book was compiled and prepared with pre-COVID-19 estimated
budgets. Funding for these projects may no longer be accurate due to anticipated revenue
losses. Updated project funding will be provided in the 2021-2022 CIP.
2020 Edition
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
HOW TO READ PROJECT PAGES
CIP Number: Unique CIP project numbers for each project Supervisorial District(s): Contains all Board of Supervisor
that help identify the type of project. Districts affected by the project.
Master Project Number: The main project number or Job District/CSA: Only used if the project is for a Special
Ledger number assigned to the project. District or County Service Area.
Other Project Numbers: Any other project or identifying Strategic Plan: Identifies how the project relates to the
numbers associated with the project. County’s strategic plan.
Contains the official
name of the project. Map showing general
location of the project.
Photo, floor plan, or
rendering of the project.
Location: The general
area of the County
Project type: Shows
project.
type of the project.
Planning Area:
Funding Status: Current
Based on Planning
funding status at time of
Department.
printing.
Estimated Completion
Project Status: Current
Date: Estimated date
project status at time of
at time of printing.
printing.
Description &
Impact to Operations:
Background: Provides
Shows the fiscal and
a brief history and/or
personnel impacts the
explanation of the
project will have.
project.
Contains the original
Funding Sources:
estimated cost as a
Shows actual funding
stand-alone number.
sources for the project
Then shows the
to date, and any
breakdown of the
remaining funding yet
estimated costs of the
to be identified. Some
project as the project
funding sources are
implementation has
currently pending.
progressed.
All prior year costs at Total project costs.
time of printing.
Future Years shows amounts that will be
Prior Fiscal Year Actual Current Fiscal Year New Proposed
added in the Adjusted Budget or are being
Costs. Estimated Actuals. Budget Amount.
planned for future budgets.
This Page Intentionally Left Blank
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
Section I Executive Summary...................................................................................................... 1 to 7
Section II County Facilities and Programmed Projects............................................................ 8
Agricultural Weights and Measures, Mosquito and Vector Control Office Remodel.................... 9
Capital Projects: Animal Services - Animal Shelter Renovation Project...................................... 10
Capital Projects: Highway 1 Mar Vista Bicycle and Pedestrian Overcrossing............................. 11
Capital Projects: Monterey Bay Scenic Sanctuary Trail Segments 10-11.................................... 12
Capital Projects: Library Project - Aptos Branch Library.............................................................. 13
Capital Projects: Library Project - Boulder Creek Branch Library................................................ 14
Capital Projects: Library Project - Felton Branch Library............................................................. 15
Capital Projects: Library Project - La Selva Beach Branch Library.............................................. 16
Capital Projects: Library Project - Live Oak Branch Library......................................................... 17
Capital Projects: Library Project - Live Oak Library Annex.......................................................... 18
General Services Department: County Office Building Improvements........................................ 19
General Services Department: Solar Installation Project............................................................. 20
Health Services Agency: 1060/1070 Emeline Various - Emeline Campus.................................. 21
Health Services Agency: 1060 Emeline and 1430 Freedom Blvd, Ste B Window Replace......... 22
Health Services Agency: 1080 Emeline Remodel - Emeline Campus......................................... 23
Health Services Agency: 1430 Freedom Boulevard, Suite D Reception...................................... 24
Health Services Agency: Behavioral Health Office Building - Freedom Campus Watsonv......... 25
Health Services Agency: Front Street.......................................................................................... 26
Health Services Agency: Harbor Vet Remodel (Behavioral Health Unit)..................................... 27
Health Services Agency: Various Buildings................................................................................. 28
Public Safety and Justice: Juvenile Hall Multi-Use Recreation Building...................................... 29
Public Safety and Justice: Juvenile Hall Renovation and Upgrades (Seed to Table).................. 30
Public Safety and Justice: Rountree Rehabilitation and Re-Entry Project................................... 31
County Facilities Fund 40 Financing Summary............................................................................ 32
Section III Public Works Programmed Projects......................................................................... 33
Public Works Projects in Multiple Districts..................................................................................... 34
2018 Measure D Resurfacing Project.......................................................................................... 35 - 36
2019 Measure D Resurfacing Project.......................................................................................... 37 - 38
2020 Measure D Resurfacing Project.......................................................................................... 39 - 40
2021 Measure D Resurfacing Project.......................................................................................... 41
2020 RSTP-STIP Resurfacing Projects....................................................................................... 42
Enhanced Rainfall Monitoring Equipment X-Band Radar Facility ............................................... 43
Freedom Sewer Rehabilitation Phase I ....................................................................................... 44
Freedom Sewer Rehabilitation Phase II ...................................................................................... 45
Green Valley Road at Casserly Creek Tributary Bridge Replacement......................................... 46
La Madrona Drive, El Rancho Road and Swanton Road Guardrail Replacement....................... 47
Pajaro River Flood Risk Reduction Project Design and Construction.......................................... 48
Striping and Guardrail Improvements........................................................................................... 49
Swanton Road and Old Santa Cruz Highway Clean / Paint Steel Bridge Members.................... 50
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
Public Works Projects in District 1................................................................................................. 51
2018 Full Depth Recycle and Overlay Project.............................................................................. 52
East Cliff Drive from 7th Avenue to 14th Avenue Pedestrian Improvements............................... 53
East Cliff 17th Avenue to Palisades Avenue Pedestrian Improvements...................................... 54
Main Street Improvements........................................................................................................... 55
Soquel Drive to 41st Avenue Dedicated Right Turn Lane............................................................ 56
Soquel Drive to Soquel Avenue Dedicated Right Turn Lane....................................................... 57
Soquel Drive at Robertson Street Intersection Signalization........................................................ 58
Widen Capitola Road from 7th Avenue to 17th Avenue from Two Lanes to Four Lanes............ 59
Widen Capitola Road from Chanticleer Avenue to 30th Avenue from Two Lanes to Four.......... 60
Public Works Projects in District 2................................................................................................. 61
Aptos Village Plan Improvements Phase I and II......................................................................... 62
Buena Vista Drive Road Rehabilitation Project............................................................................ 63
Buena Vista Landfill Mini-Flare..................................................................................................... 64
Buena Vista Landfill Organics Processing Facility....................................................................... 65
Buena Vista Landfill Transfer Station........................................................................................... 66
Coastal Ecosystem Resiliency Project for the Lower Watsonville Slough USACE Cap ............. 67
Monument Avenue Sewer Extension........................................................................................... 68
Pinehurst and Greenbrier Pedestrian Improvements................................................................... 69
Place De Mer (CSA 2) Stair Repair.............................................................................................. 70
Redwood Road at Brown's Creek Tributary Bridge Replacement............................................... 71
Rio Del Mar Flats Drainage Project.............................................................................................. 72
State Park Drive Improvements Seacliff Village........................................................................... 73
Valencia Road at Valencia Creek and Spreckels Drive at Aptos Creek Bridge Embank ............ 74
Public Works Projects in District 3................................................................................................. 75
Davenport Drinking Water Improvements Phase III..................................................................... 76
Davenport Recycled Water Project.............................................................................................. 77
Swanton Road at Big Creek Bridge Replacement....................................................................... 78
Public Works Projects in District 4................................................................................................. 79
Holohan Road at Highway 152 Intersection Improvements......................................................... 80
Los Arboles Pump Station Drainage Improvements.................................................................... 81
Trembley Lane Lift Station Pump Replacement/Relocation......................................................... 82
Public Works Projects in District 5................................................................................................. 83
Ben Lomond Transfer Station Lighting Retrofit Project................................................................ 84
Ben Lomond Sediment Pond Repair............................................................................................ 85
Boulder Creek Wastewater Treatment Plant Equalization Tank and Mixer Replace................... 86
Brimblecom Road at San Lorenzo River Bridge Replacement.................................................... 87
Conference Drive at Zayante Creek Bridge Scour Mitigation....................................................... 88
East Zayante Road at Zayante Creek Concrete Bridge Spall repair............................................ 89
Either Way at San Lorenzo River Bridge Replacement............................................................... 90
Fern Drive at San Lorenzo River Bridge Replacement................................................................ 91
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
Forest Hill Drive at Bear Creek Bridge Replacement................................................................... 92
La Madrona Drive Guardrail Replacement................................................................................... 93
Larkspur Street at San Lorenzo River Bridge Replacement........................................................ 94
Lompico Road at Lompico Creek Bridge Replacement............................................................... 95
Pleasant Way at San Lorenzo River Bridge Replacement........................................................... 96
Quail Hollow Road at Zayante Creek Bridge Replacement......................................................... 97
Rancho Rio Avenue at Newell Creek Bridge Replacement......................................................... 98
San Lorenzo Way at San Lorenzo River Bridge Replacement.................................................... 99
Two Bar Road at Two Bar Creek Bridge Rehabilitation .............................................................. 100
Public Works Disaster Recovery Projects...................................................................................... 101
March 2011 Storm Damage Various Projects.............................................................................. 102
2016 Storm Damage Various Projects......................................................................................... 103
Winter 2017 Storm Damage Various Projects............................................................................. 104
Storm Damage Individual Project Lists........................................................................................ 105 - 114
Public Works Financing Summary for Various Funds.................................................................. 115 - 119
Section IV Parks, Open Space and Cultural Services Programmed Projects......................... 120
2016 and 2017 Storm Disasters................................................................................................... 121
Aldridge Lane Park - Park Improvements.................................................................................... 122
Aptos Village Park Deferred Maintenance................................................................................... 123
Bert Scott Estate Deferred Maintenance...................................................................................... 124
Brommer Park - Park Improvements........................................................................................... 125
Carmichael Trail Park Improvements........................................................................................... 126
Chanticleer Park Phase 1 Improvements..................................................................................... 127
Chanticleer Park Phase 2 Improvements..................................................................................... 128
Davenport Landing Restroom Replacement................................................................................ 129
Felton Discovery Park - Park Development................................................................................. 130
Freedom Lake Restoration........................................................................................................... 131
Heart of Soquel Phase 2 and 3 Improvements............................................................................ 132
Hidden Beach Playground Replacement..................................................................................... 133
Highland Parks Deferred Maintenance........................................................................................ 134
Merk Road Property Roof Replacement...................................................................................... 135
Mesa Village Park Deferred Maintenance and Park Improvements............................................ 136
Moran Lake Park - Park Improvements....................................................................................... 137
Ocean Street Extension Trail....................................................................................................... 138
Pinto Lake Park Bike Pump Track............................................................................................... 139
Pinto Lake Park Deferred Maintenance and Improvements........................................................ 140
Quail Hollow Ranch Deferred Maintenance................................................................................. 141
Rockview Coastal Access Improvements.................................................................................... 142
Scott Park Deferred Maintenance and Improvements................................................................. 143
Seacliff Village Park Phase 2 Improvements............................................................................... 144
Seacliff Village Park Phase 3 Improvements............................................................................... 145
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
Seascape Beach Coastal Access (via Palo Alto Stairway) Deferred Maintenance..................... 146
Shore Trail / Beach Island Pathway Access Improvements......................................................... 147
Simpkins Family Swim Center Deferred Maintenance and Improvements.................................. 148
Soquel Lions Park - Park Improvements...................................................................................... 149
South County Parks...................................................................................................................... 150
The Farm Park Phase 2 Improvements....................................................................................... 151
Veteran's Memorial Building Deferred Maintenance ................................................................... 152
Willowbrook Park - Park Improvements....................................................................................... 153
Parks Financing Summary for Various Parks Funds................................................................... 154 - 158
Section V Unprogrammed Projects............................................................................................. 159 - 171
Section VI Appendix..................................................................................................................... 172
The County of Santa Cruz Strategic Plan 2018-2024.................................................................. 173 - 174
County Planning Areas Map......................................................................................................... 175
CIP Numbering System................................................................................................................ 176
Glossary of Terms........................................................................................................................ 177 - 178
Alphabetical Project Listing.......................................................................................................... 179 - 182
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
SECTION I
2020/21 Capital Improvement Program
County of Santa Cruz
Executive Summary
1
COUNTY OF SANTA CRUZ FINAL 2020/21 CAPITAL IMPROVEMENT PROGRAM
EXECUTIVE SUMMARY
The 2020/21 Capital Improvement Program (CIP) presents a five-year financing implementation plan for
capital improvement projects within the unincorporated County; Parks, Open Space and Cultural Services;
and County Facilities located countywide. The CIP is an outgrowth of cooperative planning, programming
and financing efforts through the County Administrative Office and by the County’s land use departments
including Planning, Public Works, and Parks, Open Space and Cultural Services, as well as non-land use
departments including the Health Services Agency, General Services Department, Probation, and the
Sheriff’s department. The content of this book was compiled and prepared with pre-COVID-19 estimated
budgets. Funding for these projects may no longer be accurate due to anticipated revenue losses. Updated
project funding will be provided in the 2021-2022 CIP. This document is organized as follows:
Section I: Executive Summary and Overview
Section II: County Facilities and Programmed Projects
This section contains individual project pages for programmed current and upcoming projects for County
facilities, as well as recently completed projects to present the final project costs upon completion. These
project pages include expenditure plans that provide prior year expenditures, actual expenditures for fiscal
year (FY) 2018/19, total estimated actual (EA) costs for the current FY 2019/20, budgets for the second
year of the two-year budget cycle for FYs 2019/20 and 2020/21, and the planned expenditures for FY
2021/22 and beyond. The section concludes with a financing summary of the County facilities Fund 40
budget as submitted in the proposed 2020/21 budget. The Fund 40 Financial Summary in the appendix is a
list of all available appropriations for capital projects, whether programmed or unprogrammed. The project
pages in this section generally reflect the entire budgeted amounts for each individual project, regardless of
whether the funds have been appropriated.
Section III: Public Works Programmed Projects
This section contains individual project pages for programmed current and upcoming projects for Public
Works, as well as recently completed projects to present the final project costs upon completion. These
project pages are separated by Supervisorial District that include expenditure plans that provide prior year
expenditures, actual expenditures for FY 2018/19, total EA costs for the current FY 2019/20, budgets for
the second year of the two-year budget cycle for FYs 2019/20 and 2020/21, and the planned expenditures
for FY 2021/22 and beyond. As directed by the Board of Supervisors, funding continues to be included for
disability access projects in a number of planning areas. Additionally, Public Works is expected to receive
$2.7 million in Measure D funds for County road resurfacing for each FYs 2019/20 and 2020/21. Measure
D projects for FYs 2017/18 and 2018/19 have been completed and total project costs are being finalized.
Any funding that is not used on a Measure D project year will be applied to future paving projects. The
final portion of this section contains storm damage project information and lists, which have been revised to
provide more detailed information including status, original damage estimates, estimated construction
years, and additional financial information. This section concludes with financing summaries for several
funds utilized by Public Works to finance portions of their projects.
Section IV: Parks, Open Space and Cultural Services Programmed Projects
This section contains individual project pages for programmed current and upcoming projects for the
Parks, Open Space and Cultural Services department, as well as recently completed projects to present
the final project costs upon completion. These project pages include expenditure plans that provide prior
year expenditures, actual expenditures for FY 2018/19, total EA costs for the current FY 2019/20, budgets
for the second year of the two-year budget cycle for FYs 2019/20 and 2020/21, and the planned
expenditures for FY 2021/22 and beyond. This section concludes with financing summaries for several
funds utilized by Parks, Open Space and Cultural Services to finance portions of their projects.
Section V: Unprogrammed Projects
A list of unprogrammed road, roadside, sanitation, flood control, parks, and recycling and solid waste
projects are provided in section five of this document. These projects currently have no funding or limited
funding available but may be considered for future projects in the next five years and meets requirements
of unincorporated County service level needs at build-out under the 1994 General Plan.
Section VI: Appendix
Includes the County Strategic Plan for 2018 through 2024, all projects in alphabetical order, a map of the
County General Plan areas, CIP project ID codes, and a glossary of terms.
2
COUNTY OF SANTA CRUZ FINAL 2020/21 CAPITAL IMPROVEMENT PROGRAM
The 2020/21 Capital Improvement Program includes 113 capital projects, excluding the Public Works and
Parks storm damage projects, at an estimated cost of $803.4 million for planning, design, right-of-way
acquisition and construction.
N u m b e r o f P r o j e c t s b y T y p e
B
C
C
F
L
L
P
P
P
R
S
r id g e
o u n t y F a c ilit y
S A P r o je c t
lo o d C o n t r o l a n d D r a in
a n d f ill a n d R e c y c lin g
ib r a r y
a r k s , O p e n S p a c e s a n d
e d e s t r ia n Im p r o v e m e n
u b lic S a f e t y
o a d a n d G u a r d r a il
e w e r a n d W a t e r
a g e
C u lt
t s
u r a l S e r v ic e s
Projects by Type Number of Projects Total Est. Costs
Bridge 18 $44,480,211
County Facility 12 $46,879,844
CSA Project 2 $419,987
Flood Control and Drainage 4 $455,456,631
Landfill and Recycling 5 $29,307,898
Library 6 $37,217,907
Parks, Open Spaces and Cultural Services 32 $32,340,037
Pedestrian Improvements 6 $38,848,156
Public Safety 3 $45,065,197
Road and Guardrail 18 $51,240,709
Sewer and Water 7 $22,181,684
Grand Total 113 $803,438,261
Estimated Cost by Project Type
Bridge
County Facility
CSA Project
Flood Control and Drainage
Landfill and Recycling
Library
Parks, Open Spaces and Cultural Services
Pedestrian Improvements
Public Safety
Road and Guardrail
Sewer and Water
3
COUNTY OF SANTA CRUZ FINAL 2020/21 CAPITAL IMPROVEMENT PROGRAM
The estimated damages for Parks during the 2016 and 2017 winter storm events are $799,196. Estimated
damages for the Public Works winter storm events of 2016 and 2017 are $119,025,000. Public Works is also
continuing to work on repairs that occurred during winter storms of March 2011, which caused a total of
$18,750,000 in damages.
Disaster recovery projects are reimbursed at a rate of 75% for FEMA and 88.53% for FHWA, with an
additional 18.75% by CalOES for the portion that is not reimbursed by FEMA or FHWA. An average of
6.25% of matching funds are contributed by the County of Santa Cruz.
Public Works staff continue to work closely with the Federal Emergency Management Agency (FEMA), the
Federal Highway Administration (FHWA), and the California Office of Emergency Services (CalOES) to
calculate anticipated repair costs and obtain all available funding.
Storm Damage Disaster Recovery Total Est. Costs
Public Works March 2011 Storm Damage Projects $18,750,000
Public Works 2016 Storm Damage Projects $9,025,000
Public Works Winter 2017 Storm Damage Projects $110,000,000
Parks 2016 and 2017 Storm Damage Projects $799,196
Grand Total $138,574,196
The content of this book was compiled and prepared with pre-COVID-19 estimated budgets. Funding for
these projects may no longer be accurate due to anticipated revenue losses. Updated project funding will
be provided in the 2021-2022 CIP.
Goals of the Capital Improvement Program
The Capital Improvement Program (CIP) is developed to address elements of the County’s General Plan as
well as other planning documents and master plans. The goals for the CIP include:
• Maintain and upgrade infrastructure to support rural, suburban and business communities.
• Develop capital projects to meet community needs.
• Align capital budgets with adopted policies and plans.
• Link the County’s development and fiscal planning processes.
Preparation
This CIP is prepared in conjunction with the annual proposed budget. All proposed project worksheets are
submitted to the Department of Public Works Department to be compiled and published in this document.
The CIP is accepted and filed by the Board of Supervisors during a regular meeting in May and then
referred to the Planning Commission to conduct a study session of the document to ensure conformance
with the General Plan. The CIP is then reviewed by the Board of Supervisors during a June study session.
Comments made during both study sessions may either impact the current year projects or be incorporated
into future capital projects as appropriate. Throughout the year individual projects are taken to the Board of
Supervisors to provide project updates.
Funding Sources
Funds for capital improvement projects are provided through a variety of sources including: State and
Federal funding, Special Revenue Funds and Enterprise Funds. Many revenue categories are restricted,
with expenditures limited to certain types of projects. The next section highlights some of the funding
sources that were utilized by the projects listed in this CIP.
4
COUNTY OF SANTA CRUZ FINAL 2020/21 CAPITAL IMPROVEMENT PROGRAM
Special Revenue Funding
A Special Revenue Fund is used to account for the proceeds of revenue sources that are restricted to
expenditures for specific purposes. Special Revenue Funds include entitlement or subvention funds and
developer fee funds. An example of an entitlement fund is the Gas Tax, whereby funds are distributed
based on population. Special revenue funding includes:
Transportation Improvement Fees: Collected as development impact fees to finance traffic-related
improvements needed at General Plan build-out and within specific planning areas.
Roadside Improvement Fees: Collected as development impact fees to finance identified roadside
improvements needed at General Plan build-out and within specific planning areas.
Gas Taxes: Funds support the overall planning, maintenance, and operation of the County’s
transportation system. Funds may be used for development review, transportation modeling, traffic signal
operation and coordination, and streetlight system maintenance. Gas Tax use must comply with State and
Federal regulations and must be directly related to street construction or maintenance. Revenue is
distributed by the State according to established formulas, based on road miles maintained and number of
registered vehicles.
Highway Safety Improvement Program: A Federal program that funds safety improvement projects to
reduce the number and severity of collisions at hazardous highway locations, sections and elements on
any public road, any public surface transportation facility, or any publicly owned bicycle or pedestrian
pathway or trail.
Highway Bridge Program: Part of the Federal Highway Act whose funds are to be used for the
reconstruction and rehabilitation of our County bridges.
Federal Emergency Management Agency (FEMA): Funds are made available to the County through the
Stafford Act when a disaster occurs and there is a presidential declaration of a disaster area. These
monies are to be spent on debris removal and repairing roads to their pre-disaster condition on non-federal
routes.
California Office of Emergency Services Disaster Relief Funds (CalOES): Funds are made available
to the County from the State government through the California Disaster Assistance Act when a disaster
has occurred and there is a Governor's proclamation of a disaster area.
Federal Highway Administration Emergency Relief (FHWA): Funds are available for the repair of
Federal-aid highways or roads on Federal lands that have been significantly damaged by natural disasters.
Measure D Funds: Countywide 1/2 cent sales tax measure to fund local streets and road maintenance,
bicycle and pedestrian projects (especially near schools), safety projects, transit and paratransit service,
and numerous essential transportation projects and programs throughout the County.
Senate Bill 1 (SB1): The Road Repair and Accountability Act of 2017. This bill invests $52 billion over the
next decade to fix roads, freeways and bridges in communities across the State of California. This funding
is split, with $26 billion for state highways and $26 billion for local needs.
Measure S Funds: Voter approved Measure S authorized $67 million bond funds to finance capital
improvements throughout the entire Santa Cruz City/County Public Library system. The County of Santa
Cruz’s share of this fund is $32.5 million. The remaining funds are allocated to the libraries located within
the surrounding cities, excluding Watsonville.
5
COUNTY OF SANTA CRUZ FINAL 2020/21 CAPITAL IMPROVEMENT PROGRAM
Enterprise Funds
Enterprise Funds are proprietary funds used to account for activities with an associated user charge.
Enterprise Funds are maintained by adopted rates and are not subsidized by the General Fund. User rates
support the full cost of operations, maintenance, capital, and reserve requirements. Enterprise Funds used
for the 2020/21 Capital Improvement Program include:
Sewer Service Fund: Established to maintain, rehabilitate, and replace sewer infrastructure. Revenue is
derived from sewer service charges collected from residents and businesses with connections to the
County-maintained sewer lines. Capital projects include rebuilding sewer lift stations, pump station
improvements, and the maintenance or replacement of sewer lines.
County Service Area/Special Districts: The County Service Area (CSA)/Special Districts are created by
local communities who desire expanded service levels in areas where residents agree to pay an annual
benefit assessment for the specified service(s) identified at the time of the formation of the CSA. CSAs can
be authorized to provide a wide variety of services, including expanded road maintenance, fire protection,
park and recreation facilities, libraries, landscaping, and parking services.
Park Dedication Funds: These funds are derived from fees collected on new residential construction or
remodels, to offset the impacts of increased population. Funds are restricted for capital projects in parks.
Grants and Minor CIP Funds
Each year, County departments apply for and receive funding from various grant awards. Many of the
grant funds received are specified to assist in development or improvements to infrastructure. By pursuing
grant opportunities, the County is able to maximize local project funds. Some of the grants used to fund
CIP projects include:
• California Boating and Waterways Grants: provides funding for coastal improvement projects
• Bridge Preventative Maintenance Program Grants: used to extend useful life of the County’s
bridges
• Safe Routes to Schools Grant: part of the Active Transportation Program that addresses traffic
safety issues near schools
• Regional Surface Transportation Program
• Surface Transportation Block Grant
• Air Quality Control Grants per AB 2766
6
COUNTY OF SANTA CRUZ FINAL 2020/21 CAPITAL IMPROVEMENT PROGRAM
Types of CIP Projects
Bridges: This category highlights improvements to the County’s bridge system. Projects may include
maintenance, repairs, and complete replacements of County bridges.
County Facilities: This category includes the establishment of solar power to several County facilities
located throughout Santa Cruz County by the General Services Department, Improvements to Juvenile
Hall and Rountree detention centers, upgrades to County facilities, and library projects including branches
located in Aptos, Boulder Creek, Felton, La Selva Beach, and Live Oak.
Disaster Recovery Projects: Capital projects that were created by a disaster such as a storm,
earthquake, or other event.
Drainage Improvements: Drainage projects include storm drain line construction or rehabilitation,
drainage pump station construction, and drainage system facilities.
Flood Control Improvements: Flood Control projects include reconstruction of levees and pump station
upgrades on the Pajaro River and Salsipuedes Creek.
Parks, Open Space and Cultural Services: Projects include both new construction and rehabilitation of
existing park facilities.
Pedestrian Safety Improvements: Improvements to the Countywide transportation system include ADA
access ramps, sidewalks, street trees, and streetscapes. Projects are intended to improve safe pedestrian
access throughout the County.
Road Improvements and Traffic Safety: This category highlights improvements to the County’s road
system. Projects may include guardrails, street and intersection widening, bike and bus facilities, parking,
traffic signals, pavement rehabilitation, pavement and concrete replacement, road widening, and grade
adjustments.
Sanitation: Sanitation improvements include sewer needs that are located in the Freedom County
Sanitation District (FCSD), and water/sewer needs located in the Davenport County Sanitation District
(DCSD). Sewer services are also provided to five small sanitation county service areas (CSAs).
Conclusion
This summary presents only some of the highlights of the 2020/21 Capital Improvement Program. Due to
the large number of projects, it is not possible to discuss each project individually. For more information on
specific projects, individuals are encouraged to contact the appropriate department who is responsible for
coordinating the work.
The 2020/21 CIP has been reviewed for conformance with the 1994 General Plan/Local Coastal Program
by the Planning Department, as required in Santa Cruz County Code §13.01.130(c). The Planning
Department has confirmed all of the improvements listed in this CIP are consistent with the General Plan/
Local Coastal Program Land Use Plan.
7
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
SECTION II
2020/21 Capital Improvement Program
County of Santa Cruz
County Facilities and Programmed Projects
8
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-1 SUPERVISORIAL DISTRICT(S): 3
MASTER PROJECT NUMBER: G L191051 DISTRICT/CSA: CSA 53
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
AGRICULTURAL WEIGHTS AND MEASUR ES, MOSQUITO AND VECTOR CONTROL:
OFFICE R EMODEL
PROJECT TYPE: Ag. W eights and Measures, Mosq. and Vector LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
Remodel of the existing building, including the addition of laboratories, meeting rooms, additional storage, and
upgrades to the electrical and mechanical systems.
IMPACT TO OPERATIONS:
The project will provide an updated facility for delivering services for protection of public health, safety and welfare. The
construction of a laboratory will improve surveillance-based vector control activities. The laboratory will provide the Mosquito
and Vector Control District the capability for rapid identification and testing of mosquitoes for viruses and pesticide resistance, the
ability to test for disease prevalence in mosquitoes and ticks, and the ability to improve current integrated pest management
practices through better monitoring and understanding of our local mosquito populations.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 989,000 CSA 53 Fund Balance $ 1 ,726,470
$ -
Preliminary $ - $ -
Design $ 124,295 $ -
Acquisition $ - $ -
Construction $ 1,480,960 $ -
Other $ 121,215 Total Project Funding $ 1 ,726,470
Total Estimated Cost $ 1,726,470 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 1 ,567,971 $ 78,704 $ 7 9,795 $ - $ - $ - $ - $ - $ - $ 1,726,470
9
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-2 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: G L 191024 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.A, 6.C
CAPITAL P ROJECTS:
ANIMAL SERVICES - ANIMAL SH ELTER RENOVATION PROJECT
PROJECT TYPE: Capital Projects LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Design and Permitting Phase ESTIMATED COMPLETION DATE: 0 6/2022
DESCRIPTION & BACKGROUND:
General interior renovation of existing primary animal shelter facility, conversion of accessory structure to cat café, and
construction of new volunteer training building, and related site improvements.
IMPACT TO OPERATIONS:
Renovation of the existing facility will improve overall operational efficiencies and allow for expansion of existing
volunteer programs and animal support related programs. Operating costs will be provided by the Santa Cruz County
Animal Shelter who operates this branch.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 3,603,684 Other Bond Funds $ 1,371,477
$ -
Preliminary $ 22,915 $ -
Design $ 1,291,793 $ -
Acquisition $ - $ -
Construction $ 2,288,976 $ -
Other $ - Total Project Funding $ 1,371,477
Total Estimated Cost $ 3,603,684 Funding Not Yet Identified $ 2,232,207
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 22,915 $ 2 78,103 $ 1 ,070,459 $ 2 ,232,207 $ - $ - $ - $ - $ 3,603,684
10
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-3 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: G L 601000 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 63060 STRATEGIC PLAN: 3.B, 4.A
CAPITAL P ROJECTS:
HIGHWAY 1 MAR VISTA BICYCLE A ND PEDESTRIAN OVERCROSSING
PROJECT TYPE: Capital Projects LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Project Approval and Environmental Document ESTIMATED COMPLETION DATE: 2 024
DESCRIPTION & BACKGROUND:
The Highway 1 Mar Vista Bicycle and Pedestrian Overcrossing will provide a safe link between schools, the beach,
residential neighborhoods and retail centers on each side of Highway 1. The Mar Vista crossing will reduce travel
distances for bicyclists and pedestrians traveling between Mar Vista Drive at McGregor Drive in Seacliff to Mar Vista
Elementary School by up to 1.6 miles and minimize travel through the busy State Park Drive interchange.
IMPACT TO OPERATIONS:
Continued maintenance of the bicycle and pedestrian overcrossing are anticipated but estimates of these costs are
difficult to quantify at this time. Estimates will be provided upon completion of this project.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 2,915,000 RSTPX $ 5 25,481
STIP $ 6 ,779,000
Preliminary $ 625,000 Measure D $ 3 00,000
Design $ 1,260,000 $ -
Acquisition $ 1,200,000 $ -
Construction $ 1 2,000,000 $ -
Other $ - Total Project Funding $ 7 ,604,481
Total Estimated Cost $ 1 5,085,000 Funding Not Yet Identified $ 7 ,480,519
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 1 00,000 $ 525,000 $ 1 ,600,000 $ 3 ,360,000 $ 9 ,500,000 $ - $ - $ 15,085,000
11
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-4 SUPERVISORIAL DISTRICT(S): 1, 2
MASTER PROJECT NUMBER: G L 601000 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 63061 STRATEGIC PLAN: 3.B, 4.A
CAPITAL P ROJECTS:
MONTEREY BAY SCENIC SANCT UARY TRAIL SEGMENTS 10-11
PROJECT TYPE: Capital Projects LOCATION: Mid and South County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak, Capitola, Seacliff
PROJECT STATUS: Preliminary Design & Environmental Review ESTIMATED COMPLETION DATE: 2 023
DESCRIPTION & BACKGROUND:
This project will conduct the preliminary design and environmental approval for segments 10 and 11 of the RTC-funded
regional rail-trail project. This project spans from 17th Avenue in Live Oak to State Park Drive.
IMPACT TO OPERATIONS:
Construction of new rail-trail segments will improve multi-modal transportation opportunities. Increased maintenance
costs are anticipated for vegetation management and trail resurfacing, although estimates of these costs are difficult to
quantify at this time.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 3,500,000 RTC - Measure D $ 3 ,500,000
$ -
Preliminary $ - $ -
Design $ 3,500,000 $ -
Acquisition $ - $ -
Construction $ - $ -
Other $ - Total Project Funding $ 3 ,500,000
Total Estimated Cost $ 3,500,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 2 5,000 $ 1 ,000,000 $ 1 ,000,000 $ 1 ,475,000 $ - $ - $ - $ 3,500,000
12
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-5 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: G L 191401 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 19521 STRATEGIC PLAN: 5.B, 5.D
CAPITAL P ROJECTS:
LIBRARY PROJECT - AP TOS BRANCH LIBRARY
PROJECT TYPE: Capital Projects LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: A ptos
PROJECT STATUS: Design-Build Team Selection ESTIMATED COMPLETION DATE: 2 022
DESCRIPTION & BACKGROUND:
Constructed in 1975, the approximately 8,000-square foot Aptos Branch Library is due for a complete rebuild to
address accessibility requirements, upgrade building systems, improve data and connectivity, and to enhance user
experience. Project funding provided by the Santa Cruz Libraries Facilities Financing Authority, Measure S for Libraries
and County Library Fund.
IMPACT TO OPERATIONS:
A complete rebuild of the building should result in a reduction of maintenance and operational costs due to the
installation of new and more efficient building systems. Operating costs and the majority of maintenance costs will be
provided by the Santa Cruz Public Libraries who operate this branch. Planning for a long term maintenance cost share
plan is still in development.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 0,000,000 Leonard Trust $ 6 00,000
County Library Funds $ 6 04,680
Preliminary $ 12,000 Measure S for Libraries $ 12,938,739
Design $ 2,482,200 $ -
Acquisition $ - $ -
Construction $ 9,928,800 $ -
Other $ 1,720,419 Total Project Funding $ 14,143,419
Total Estimated Cost $ 1 4,143,419 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 18,677 $ 317,979 $ 1 15,737 $ 2 ,618,211 $ 1 0,083,309 $ 9 89,506 $ - $ - $ - $ 1 4,143,419
13
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-6 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: G L 191402 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 19522 STRATEGIC PLAN: 5.B, 5.D
CAPITAL P ROJECTS:
LIBRARY PROJECT - BOULDE R CREEK BRANCH LIBRARY
PROJECT TYPE: Capital Projects LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Bidding ESTIMATED COMPLETION DATE: 2 021
DESCRIPTION & BACKGROUND:
This project consists of renovation of an existing 4,600-square-foot facility that serves the northern San Lorenzo Valley
community of Boulder Creek. Improvements to include renovation of the existing restrooms for ADA compliance,
reconfiguration and renovation of the central reading room, replacement of septic tank, plus new shelving, lighting,
finishes and acoustic improvements as feasible.
IMPACT TO OPERATIONS:
Replacement of the septic tank and new restrooms should result in a reduction of maintenance and operations costs.
The branch is operated by Santa Cruz Public Libraries. Operating costs and the majority of maintenance costs will be
provided by the Santa Cruz Public Libraries who operate this branch. Planning for a long term maintenance cost share
plan is still in development.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 500,000 County Library Funds $ 30,234
Measure S for Libraries $ 1 ,631,700
Preliminary $ 3 ,600 $ -
Design $ 300,938 $ -
Acquisition $ - $ -
Construction $ 1,161,133 $ -
Other $ 196,263 Total Project Funding $ 1 ,661,934
Total Estimated Cost $ 1,661,934 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 48,395 $ 86,106 $ 8 6,351 $ 1 ,441,082 $ - $ - $ - $ - $ - $ 1,661,934
14
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-22 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: G L 191402 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 19522 STRATEGIC PLAN: 5.B, 5.D
CAPITAL P ROJECTS:
LIBRARY PROJECT - FEL TON BRANCH LIBRARY
PROJECT TYPE: Capital Projects LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Construction Close-Out ESTIMATED COMPLETION DATE: 2 020
DESCRIPTION & BACKGROUND:
This project consists of construction of a new 8,990-square-foot, one-story library. Includes open floor plan with adult
and children's collections, community room, teen room, and study room. Site improvements include a new patio,
parking lot, replacement of a culvert with a pedestrian bridge on Bull Creek, and landscape and riparian planting.
IMPACT TO OPERATIONS:
Operating costs and the majority of maintenance costs will be provided by the Santa Cruz Public Libraries who operate
this branch. Planning for a long term maintenance cost share plan is still in development.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 0,000,000 Measure S for Libraries $ 11,493,000
County Library Funds $ 6 04,680
Preliminary $ 12,000 Donations $ 1 00,000
Design $ 1,465,577 $ -
Acquisition $ - $ -
Construction $ 9,145,400 $ -
Other $ 1,574,703 Total Project Funding $ 12,197,680
Total Estimated Cost $ 1 2,197,680 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 1 ,145,370 $ 5 ,998,500 $ 4,156,741 $ 897,069 $ - $ - $ - $ - $ - $ 12,197,680
15
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-7 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: G L 191404 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 19524 STRATEGIC PLAN: 5.B, 5.D
CAPITAL P ROJECTS:
LIBRARY PROJECT - LA SELV A BEACH BRANCH LIBRARY
PROJECT TYPE: Capital Projects LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: L a Selva
PROJECT STATUS: Construction ESTIMATED COMPLETION DATE: 2 020
DESCRIPTION & BACKGROUND:
This project consists of the renovation of an existing 2,000-square-foot library. Full renovation of the building interior
is planned to include reconfiguration of the entry, circulation desk, adult and children's collections. New windows,
doors, flooring and finishes, mechanical, electrical and data systems, shelving and furnishings are planned. Patio
improvements will be included as feasible.
IMPACT TO OPERATIONS:
Improvements should result in some operational improvements for Santa Cruz Public Libraries. The branch is operated
by Santa Cruz Public Libraries in space leased from the La Selva Beach Recreation District. Operating costs and the
majority of maintenance costs will be provided by the Santa Cruz Public Libraries who operate this branch. Planning for
a long term maintenance cost share plan is still in development.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 500,000 County Library Funds $ 30,234
Measure S for Libraries $ 1 ,631,700
Preliminary $ 5 ,100 $ -
Design $ 300,938 $ -
Acquisition $ - $ -
Construction $ 1,161,133 $ -
Other $ 194,763 Total Project Funding $ 1 ,661,934
Total Estimated Cost $ 1,661,934 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 54,335 $ 189,873 $ 1,106,120 $ 311,606 $ - $ - $ - $ - $ - $ 1,661,934
16
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-8 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: G L 191405 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 19525 STRATEGIC PLAN: 5.B, 5.D
CAPITAL P ROJECTS:
LIBRARY PROJECT - LIVE OAK BRANCH LIBRARY
PROJECT TYPE: Capital Projects LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Permitting ESTIMATED COMPLETION DATE: 2 021
DESCRIPTION & BACKGROUND:
This project consists of minor upgrades to an existing 13,500-square-foot library. Improvements to include upgrades to
children's and teen areas and furnishings, site signage to improve visibility, miscellaneous interior and exterior repairs,
new self-check stations and HVAC repairs.
IMPACT TO OPERATIONS:
Repairs to HVAC should improve operations. The branch is operated by Santa Cruz Public Libraries. Operating costs and
the majority of maintenance costs will be provided by the Santa Cruz Public Libraries who operate this branch. Planning
for a long term maintenance cost share plan is still in development.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 500,000 Measure S for Libraries $ 5 00,000
$ -
Preliminary $ 12,565 $ -
Design $ 72,735 $ -
Acquisition $ - $ -
Construction $ 414,700 $ -
Other $ - Total Project Funding $ 5 00,000
Total Estimated Cost $ 500,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 31,561 $ 44,017 $ 3 0,000 $ 394,422 $ - $ - $ - $ - $ - $ 500,000
17
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-9 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: G L 191406 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 19526 STRATEGIC PLAN: 5.B, 5.D
CAPITAL P ROJECTS:
LIBRARY PROJECT - LIVE OAK LIBRARY ANNEX
PROJECT TYPE: Capital Projects LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: 2 022
DESCRIPTION & BACKGROUND:
The concept of the Live Oak Library Annex is to provide a library annex-learning center with library technology, access
to materials, and learning spaces at the Simpkins Family Swim Center and Live Oak Community Center. It is anticipated
that this will include construction of a building addition and some renovation of existing building and site facilities.
IMPACT TO OPERATIONS:
Operational and maintenance impacts to be determined. Operating costs and the majority of maintenance costs will be
provided by the Santa Cruz Public Libraries who operate this branch. Planning for a long term maintenance cost share
plan is still in development.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 4,500,000 County Library Funds $ 3 02,340
Parks - Simpkins Center $ 1 ,000,000
Preliminary $ 24,944 Measure S for Libraries $ 5 ,750,600
Design $ 740,363 $ -
Acquisition $ - $ -
Construction $ 5,440,600 $ -
Other $ 847,033 Total Project Funding $ 7 ,052,940
Total Estimated Cost $ 7,052,940 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 95,295 $ 11,814 $ 2 47,449 $ 6 ,060,000 $ 5 50,000 $ 8 8,382 $ - $ - $ - $ 7,052,940
18
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-10 SUPERVISORIAL DISTRICT(S): 3
MASTER PROJECT NUMBER: G L191051 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.A, 6.C
GENERAL SERVICE S DEPARTMENT:
COUNTY OFFICE BUILD ING IMPROVEMENTS
PROJECT TYPE: General Services LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: C ity of Santa Cruz
PROJECT STATUS: Not Yet Started ESTIMATED COMPLETION DATE: 1 2/2020
DESCRIPTION & BACKGROUND:
Building sealing would include removal of old sealants, caulking, mastic and backer rods and installation of new as well
as application of building sealant $803,000 Restroom Pipe Replacement: replacement of all original piping in the men's
and women's restrooms $75,000. The balance of $153,649 will be used to offset the cost of a replacement generator.
IMPACT TO OPERATIONS:
The existing sealant, caulking, mastic and backer rod have deteriorated throughout the building causing extensive leaks and
damage to walls, carpets and furniture. Funding of this repair will prolong the building interior space and preserve newly
remodeled offices. The original piping has deteriorated and necessitated costly emergency repairs. The remaining balance will off-
set the cost of a generator which will be able to support building activities during power losses including future public safety power
shutoffs.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,031,649 General Fund $ 1,031,649
$ -
Preliminary $ - $ -
Design $ 200,000 $ -
Acquisition $ - $ -
Construction $ 831,649 $ -
Other $ - Total Project Funding $ 1,031,649
Total Estimated Cost $ 1,031,649 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 85,804 $ 3 05,000 $ 640,845 $ - $ - $ - $ - $ - $ 1,031,649
19
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-11 SUPERVISORIAL DISTRICT(S): 1,2,3,4
MASTER PROJECT NUMBER: 1 6C1-009 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
GENERAL SERVICE S DEPARTMENT:
SOLAR INSTALLA TION PROJECT
PROJECT TYPE: General Services LOCATION: Mid and South County
FUNDING STATUS: F ully Funded PLANNING AREA: V arious
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
Since June 2015 the General Services Department has served as the lead agency in the Monterey Bay Region Solar
Collaborative Procurement Initiative and the Sustainable Energy and Economic Development fund program to establish
solar power at County facilities. Installation sites include the Main County Building, 1080 and 1040 Emeline, Simpkins
Swim Center, Brommer Yard, Animal Services, Center for Public Safety and Men's Detention.
IMPACT TO OPERATIONS:
This project which includes rooftop, parking lot and ground mount arrays is anticipated to offset the County facility
utility use by nearly half, producing nearly 3.5 million kilowatts of energy and saving 637 tons of carbon emissions
annually. Net savings to the County of the expected 25-year useful life of the equipment is $17.5 million.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 7,642,312 Clean Renewable Energy Bonds $ 7 ,742,312
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 7,599,815 $ -
Other $ 142,497 Total Project Funding $ 7 ,742,312
Total Estimated Cost $ 7,742,312 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 7 ,536,676 $ 170,326 $ - $ 35,310 $ - $ - $ - $ - $ - $ 7,742,312
20
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-12 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 91015 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
PROJECT TYPE: Health Services Agency LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: C ity of Santa Cruz
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This budget unit consists of two projects. The first project is the HSA Water Lab Relocation Project under which HSA
relocated its Environmental Health Water Lab from 1080 Emeline to 1060 Emeline in order to provide space for more
clinic exam rooms. The second project, the 1070 Siding and Windows Replacement Project, was added during fiscal
year 2017/18 and is necessary due to significant deterioration of the current siding and failure of window components.
IMPACT TO OPERATIONS:
Operations conducted in both 1060 Emeline and 1070 Emeline are completed. The Water Lab Relocation Project was
completed on November 19, 2018. The 1070 Emeline Siding and Windows Project was completed on January 18, 2019.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 250,000 Inter-Govt. Transfer Funds $ 5 46,411
$ -
Preliminary $ 15,000 $ -
Design $ 35,000 $ -
Acquisition $ - $ -
Construction $ 496,411 $ -
Other $ - Total Project Funding $ 5 46,411
Total Estimated Cost $ 546,411 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 538,689 $ 7,722 $ - $ - $ - $ - $ - $ - $ - $ 546,411
21
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-13 SUPERVISORIAL DISTRICT(S): 1, 4
MASTER PROJECT NUMBER: 1 91076 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
PROJECT TYPE: Health Services Agency LOCATION: Mid and South County
FUNDING STATUS: F ully Funded PLANNING AREA: V arious
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: 0 6/2021
DESCRIPTION & BACKGROUND:
This is a Windows Replacement Project for 1060 Emeline Avenue and 1430 Freedom Boulevard, Suite B.
IMPACT TO OPERATIONS:
Reduction of maintenance and operational costs and increase employee comfort. Studies have found that replacing
single pane windows with double pane can save between 21% to 31% off of heating and cooling costs.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 250,000 Inter-Govt. Transfer Funds $ 2 50,000
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 250,000 $ -
Other $ - Total Project Funding $ 2 50,000
Total Estimated Cost $ 250,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 2 50,000 $ - $ - $ - $ - $ - $ - $ 250,000
22
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-14 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 91020 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 1.A, 6.C
PROJECT TYPE: Health Services Agency LOCATION: Mid County
FUNDING STATUS: F ully funded PLANNING AREA: C ity of Santa Cruz
PROJECT STATUS: Construction ESTIMATED COMPLETION DATE: 0 1/2021
DESCRIPTION & BACKGROUND:
This project consists of the completed remodel of HSA’s Santa Cruz Health Center located on the first floor of 1080 Emeline
Avenue to expand operations with the addition of 14 new exam rooms. As part of the renovation, all flooring, walls, lighting,
heating and cooling systems, and exam and office room furnishings were replaced. Phase 2 of the project is now in
construction for the 1080 Emeline HVAC and Lighting Project which includes replacement of ceilings, lights and HVAC
systems in the basement and second floor at 1080 Emeline Avenue; and a secure reception area on the second floor.
IMPACT TO OPERATIONS:
This expansion provided capacity for approximately 5,000 additional patient visits per year for the clinic’s primarily
Medi-Cal and indigent populations. Phase 2 of the project will reduce future maintenance and operations costs and
increase efficiencies and employee comfort and safety.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 5,250,735 CCAH, HIP, HRSA Grants $ 2 ,500,000
Inter-Govt. Transfer Funds $ 9 ,813,767
Preliminary $ 100,000 $ -
Design $ 150,000 $ -
Acquisition $ - $ -
Construction $ 1 1,563,032 $ -
Other $ 500,735 Total Project Funding $ 12,313,767
Total Estimated Cost $ 1 2,313,767 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 460,221 $ 3 ,557,447 $ 2,780,720 $ 5 ,515,379 $ - $ - $ - $ - $ - $ 12,313,767
23
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-15 SUPERVISORIAL DISTRICT(S): 4
MASTER PROJECT NUMBER: 1 91075 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 1.A, 6.C
HEALTH SERVI CES AGENCY:
1430 FREEDOM BOULEVA RD, SUITE D RECEPTION
PROJECT TYPE: Health Services Agency LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: F reedom Campus
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: 0 6/2021
DESCRIPTION & BACKGROUND:
Remodel of reception and lobby area: including new reception furniture, bathroom renovation, new flooring and
painting.
IMPACT TO OPERATIONS:
Project would improve marketing efforts to retain and attract new patients in an increasingly competitive environment
by improving main entrance space of clinic, improving patient flow, and upgrading patient bathrooms. This would also
reduce annual maintenance of current bathrooms for GSD.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 500,000 Inter-Govt. Transfer Funds $ 5 00,000
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 500,000 $ -
Other $ - Total Project Funding $ 5 00,000
Total Estimated Cost $ 500,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 5 00,000 $ - $ - $ - $ - $ - $ - $ 500,000
24
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-16 SUPERVISORIAL DISTRICT(S): 4
MASTER PROJECT NUMBER: 1 91075 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 1.D, 6.C
PROJECT TYPE: Health Services Agency LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: F reedom Campus
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This project involved construction of an approximately 13,500-square-foot Behavioral Health Office Building providing
office space for 50 staff for provision of behavioral health services. Services were transitioned from 1430 Freedom
Boulevard, Suite B, to this new facility.
IMPACT TO OPERATIONS:
HSA expanded access to behavioral health services in the south county area. Project was completed on October 1,
2019. The new facility more than doubles the space to 13,000 square feet and increases the number of offices from 12
to 44. The building has also doubled the amount of psychiatric space.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 7,000,000 CCAH Grant $ 2 ,500,000
Inter-Govt. Transfer Funds $ 5 ,318,903
Preliminary $ 100,000 $ -
Design $ 150,000 $ -
Acquisition $ - $ -
Construction $ 5,000,000 $ -
Other $ 2,568,903 Total Project Funding $ 7 ,818,903
Total Estimated Cost $ 7,818,903 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 156,046 $ 3 ,744,577 $ 3,295,356 $ 622,924 $ - $ - $ - $ - $ - $ 7,818,903
25
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-17 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 91079 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 1.D
PROJECT TYPE: Health Services Agency LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: C ity of Santa Cruz
PROJECT STATUS: Ready for Requests for Proposals ESTIMATED COMPLETION DATE: 0 6/2020
DESCRIPTION & BACKGROUND:
Site improvements to include replacement of stairs, rebuild of deck, exterior siding and remodel of bathrooms. The
plans and specifications have been created, and the project will soon go out for Requests for Proposals.
IMPACT TO OPERATIONS:
Project would reduce the liability risk to the County by improving walkways, stairwells, and bathrooms. This adult living
facility is restricted to community members with special needs that otherwise could expose the county to higher
liability risks.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 250,000 Inter-Govt. Transfer Funds $ 257,908
$ -
Preliminary $ - $ -
Design $ 7,908 $ -
Acquisition $ - $ -
Construction $ 250,000 $ -
Other $ - Total Project Funding $ 257,908
Total Estimated Cost $ 257,908 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 2 57,908 $ - $ - $ - $ - $ - $ - $ 257,908
26
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-18 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 91154 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 1.D, 6.C
PROJECT TYPE: Health Services Agency LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Health Services Agency (HSA) is conducting planning analyses for demolishing the building previously occupied by
Harbor Veterinary Hospital and replacing it with a two-story building to maximize the space available for services and
staffing in conjunction with operations of HSA’s adjacent Behavioral Health Center (BHC).
IMPACT TO OPERATIONS:
HSA is exploring several options for locating clinical services to this site, including creating a new crisis program, relocating
the Sobering Center, and relocating the Crisis Stabilization Program from the BHC to potentially increase the number of
inpatient beds. The costs for inpatient care are rising at a level of approximately $2 million per year, with increase in HSA’s
Institutions for Mental Disease (IMD) also approaching those same levels of increases. The 16-bed crisis residential program
envisioned for this project would allow HSA to reduce those costs significantly by as much as an estimated 50%.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 3,000,000 Inter-Govt. Transfer Funds $ 2 ,624,768
Preliminary $ 100,000 $ -
Design $ 150,000 $ -
Acquisition $ - $ -
Construction $ 8,750,000 $ -
Other $ 124,768 Total Project Funding $ 2 ,624,768
Total Estimated Cost $ 9,124,768 Funding Not Yet Identified $ 6 ,500,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 124,768 $ - $ - $ 2 ,500,000 $ - $ - $ - $ - $ 6,500,000 $ 9 ,124,768
27
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-19 SUPERVISORIAL DISTRICT(S): 1, 4
MASTER PROJECT NUMBER: 1 91076 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 1.A, 6.C
PROJECT TYPE: Health Services Agency LOCATION: Mid and South County
FUNDING STATUS: F ully Funded PLANNING AREA: V arious
PROJECT STATUS: Construction ESTIMATED COMPLETION DATE: 0 6/2021
DESCRIPTION & BACKGROUND:
This Budget unit consists of multiple projects within HSA including the completed partial remodel of the Watsonville
Health Center (WHC) ($1,000,000) which created four exam rooms and an additional provider workspace. This budget
also includes the remodel of HSA Environmental Health (EH) Division office space at the County Government Center
located at 701 Ocean Street ($350,000) and Security Enhancements to various HSA Building locations ($489,204).
IMPACT TO OPERATIONS:
Project will provide for improved operational safety, reducing risk exposure. One project will also convert non-billable space
into client serving billable space. Another component will create a secondary Health Services Agency emergency operations
center in Watsonville, providing access to emergency grant funds to retrofit former staff working areas. Another component
will allow for more remote-work force options that will support the elimination of the last 7 years of a $166k annual lease.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,839,204 Fund Balance $ 1 ,963,972
$ -
Preliminary $ 50,000 $ -
Design $ 140,000 $ -
Acquisition $ - $ -
Construction $ 1,773,972 $ -
Other $ - Total Project Funding $ 1 ,963,972
Total Estimated Cost $ 1,963,972 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 63,781 $ 1,331,981 $ 5 68,210 $ - $ - $ - $ - $ - $ - $ 1,963,972
28
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-21 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: G L 191101 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: JJ 3002 STRATEGIC PLAN: 1.A, 1.C, 6.C
PUBLIC SAFETY AND J USTICE - PROBATION:
JUVENILE HALL MULTI-US E RECREATION BUILDING
PROJECT TYPE: Public Safety and Justice LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Final Design & Construction Bid ESTIMATED COMPLETION DATE: 2 021
DESCRIPTION & BACKGROUND:
Construction of an addition to the Juvenile Hall facility of a multi-use recreation and programs building to provide a
required all-weather exercise facility to improve youths’ large motor skill physical activities. The building will include a
gymnasium with indoor basketball and volleyball courts, program training rooms, and a storage and mechanical room.
Project also provides fire protection and security system improvements with onsite habitat restoration.
IMPACT TO OPERATIONS:
Minimal increases of ongoing building operational and maintenance costs are anticipated, estimated at roughly
$25,000 per year, as new building is designed with efficient systems.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,927,400 State BSCC SB81 Grant-Round 1 $ 1 ,355,608
CFA CERTS Bond 2015B $ 1 ,500,000
Preliminary $ 25,000 CFA CERTS Bond 2016 $ 1 75,000
Design $ 225,812 General Fund - Type 40 $ 5 35,204
Acquisition $ - $ -
Construction $ 2,690,000 $ -
Other $ 625,000 Total Project Funding $ 3 ,565,812
Total Estimated Cost $ 3,565,812 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 357,213 $ 23,665 $ 5 6,190 $ 704,128 $ 1 ,408,480 $ 9 92,136 $ 12,000 $ 12,000 $ - $ 3,565,812
29
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-20 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: 1 91102 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: J J3003 STRATEGIC PLAN: 1.C, 6.C
PUBLIC SAFETY AND J USTICE - PROBATION:
JUVENILE HALL RENOVATION AN D UPGRADES (SEED TO TABLE)
PROJECT TYPE: Public Safety and Justice LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Final Design ESTIMATED COMPLETION DATE: 2 021
DESCRIPTION & BACKGROUND:
Major renovation and upgrades to the existing Juvenile Hall facility, built in 1968, to improve rehabilitation and
educational programming for the youth. Project includes major kitchen and dining area remodel with new garden and
greenhouse for “seed to table” programs; control center, day room and accessibility improvements; and electrical,
mechanical and security system upgrades. Site work includes parking, landscape, storm drain and security fence
improvements.
IMPACT TO OPERATIONS:
Renovation of the building systems should result in a reduction of ongoing operational and maintenance costs
anticipated at roughly $30,000 per year with increased efficiencies, improved safety, and a reduction in emergency
repairs.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 12,959,000 State BSCC SB81 Grant-Round 2 $ 9,503,000
CFA CERTS Bond 2015B $ 6 84,757
Preliminary $ 15,000 General Fund - Type 40 $ 2,771,243
Design $ 8 60,000 $ -
Acquisition $ - $ -
Construction $ 9,879,000 $ -
Other $ 2,205,000 Total Project Funding $ 1 2,959,000
Total Estimated Cost $ 12,959,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 2 ,538,240 $ - $ 1 37,760 $ 5 ,307,000 $ 4 ,940,000 $ 1 2,000 $ 12,000 $ 12,000 $ - $ 12,959,000
30
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: C-P-23 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: G L191300 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 63053 STRATEGIC PLAN: 1.C, 6.C
PUBLIC SAFETY AND JUSTICE - SHERIFF:
ROUNTREE REHABILITATIO N AND RE-ENTRY PROJECT
PROJECT TYPE: Public Safety and Justice LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Andreas
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
The project includes the renovation of the existing minimum security building including classroom and training space
and the addition of a new 64-bed housing unit. Also included is a new visitation building, and administration addition
to the medium security building, new inmate outdoor recreation and garden areas. The unit is operational and is
designed as an innovative program to expand housing options and serve as the last step in the incarceration process.
IMPACT TO OPERATIONS:
The project includes approximately 32,000 square feet of renovated and new building construction. Although costs for
long-term capital maintenance will be required for the facility, the new energy efficient building systems will support a
reduction in annual facility operating costs.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 28,428,000 SB-1022 Lease Revenue Bond $ 24,635,000
General Fund $ 3,793,000
Preliminary $ - Contributions/Other Funding $ 112,385
Design $ 2,603,191 $ -
Acquisition $ - $ -
Construction $ 22,144,194 $ -
Other $ 3,793,000 Total Project Funding $ 28,540,385
Total Estimated Cost $ 28,540,385 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 2 8,038,121 $ 502,264 $ - $ - $ - $ - $ - $ - $ - $ 2 8,540,385
31
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
COUNTY FACILITIES FINANCING SUMMARY
FUND 40
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $1,626,003 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $7,567,941 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $9,193,944 $0 $0 $0 $0
$9,306,815 $36,935,217 $35,478,222 $43,159,034 CARRY OVER $0 $0 $0 $0 $0
DESCRIPTION
County Facilities Master Planning $800,000 3 00,008
1020 Emeline 454,835 $0
1040 Emeline 16,139 $0
1060/70 Emeline 203,589 $0
1080 Emeline 5,515,378 $0
1400 Emeline 34,387 $0
Animal Services 7th Avenue 1,371,477 $0
640 Capitola Road 79,975 $0
Blaine Street 22,663 $0
County Office Buildings 1,031,649 $0
1442 Freedom Health Services Agency 266,477 $0
Freedom Behavioral Health Unit (BHU) 1 , 8 0 4 , 0 21 $0
Health Services Agency Buildings Various 834,470 $0
Ag Extension 1432 Freedom 26,300 $0
Disability Access - Various Locations 1,089 $0
Juvenile Hall 10,025 $0
Juvenile Hall Gym Renovation 3,349,161 $0
Juvenile Hall R2 Renovation 10,187,757 $0
Main Jail 259 Water Street 32,455 $0
Chanticleer Park 1,882,122 $0
Felton Library Discovery Park 1,467,830 $0
Farm Park - $235,000
Simpkins Center 17th Ave - $75,000
Watsonville Veterans Building 26,897 $0
Santa Cruz Veterans Building - $95,843
Parks - Parks & Rec Other 219,466 $924,040
BHU 2202/80 Soquel Avenue - $2,500,000
5200 Soquel - Emerg. Oper. Center (EOC) 51,415 $0
Center for Public Safety 23,020 $0
Parks & Rec 2015B CERTS Projects 105,800 $445,101
Energy Efficiency Project 1,031,356 $0
Solar Energy Project 35,310 $0
Sheriff Rountree Facility 30,239 $0
Library Projects 3,632,698 $1,177,827
Aptos Library - Measure S 828,249 $1,445,739
Boulder Creek Library - Measure S 352,296 $0
Felton Library - Measure S 5,288,449 $0
La Selva Library - Measure S 1,444,126 $0
Live Oak Library - Measure S 515,086 $0
Live Oak Annex- Measure S (56) $0
Heart of Soquel 176,870 $305,600
Parks - Various Park Projects - $1,689,786
Seismic Upgrades 6,014 $0
$43,159,034 $9,193,944 $0
32
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
SECTION III
2020/21 Capital Improvement Program
County of Santa Cruz
Public Works Programmed Projects
33
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS PROJECTS IN MULTIPLE DISTRICTS
34
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: PM-P-1 SUPERVISORIAL DISTRICT(S): 1, 2, 3, 5
MASTER PROJECT NUMBER: P 13401 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C, 6.C
2018 MEA SURE D
RESURFACIN G PROJECT
PROJECT TYPE: Pavement Management LOCATION: Countywide
FUNDING STATUS: F ully Funded PLANNING AREA: C ountywide
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
This project involves pavement preservation of approximately 6.51 miles of County roadways, including 22 different
roads. The primary application used will be a rubberized cape seal to the entire roadway surface, then restriping of the
work area. Striping enhancements for bicycle facilities were considered and incorporated during the design phase of
the project. Any funding that is not used on a Measure D project year will be applied to a future project.
IMPACT TO OPERATIONS:
Pavement preservation projects extend the life of the existing roadway by a minimum of 5 years and address current
maintenance needs such as pothole repair, surface protection, and restriping. This project will reduce maintenance needs on
project roadways for the life of the resurfacing treatment. This project will seal roadway surfaces. When regular preventative
maintenance such as surface sealing is not performed the roadway will continue to degrade until more costly measures are
required, ultimately requiring the roadway to be reconstructed at 3 to 4 times the cost of a surface seal.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,400,500 Measure D $ 2 ,776,680
Preliminary $ -
Design $ 20,000
Acquisition $ -
Construction $ 2,197,269
Other $ - Total Project Funding $ 2 ,776,680
Total Estimated Cost $ 2,217,269 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 8,912 $ 2,147,233 $ 6 1,124 $ - $ - $ - $ - $ - $ - $ 2,217,269
35
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: PM-P-1 SUPERVISORIAL DISTRICT(S): 1, 2, 3, 5
MASTER PROJECT NUMBER: P 13401 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN:
2018 MEASURE D
RESURFACING PROJECT LIST
Road Name Beginning Location Ending Location District Treatment Length
Miller Cut-Off Miller Hill Rd. Soquel San Jose Rd. 1 Pulverize & Rubber Cape 0.76
Miller Hill Rd. Soquel San Jose Rd. Skyland Rd. 1 Pulverize & Rubber Cape 1.00
Playa Blvd. San Andreas Rd. Vista Dr. 2 Rubber Cape with 10% Digout 0.46
Palma Ave. Playa Blvd. Playa Blvd. 2 Rubber Cape with 5% Digout 0.17
Arbolado Dr. Playa Blvd. 120' W/O Playa Blvd. 2 Rubber Cape Only 0.02
Arbolado Dr. 120' W/O Playa Blvd. ECM 2 Pulverize & Rubber Cape 0.03
Arbolado Dr. Estrella Ave. Breve Ave. 2 Pulverize & Rubber Cape 0.09
Breve Ave. Arbolado Dr. Playa Blvd. 2 Pulverize & Rubber Cape 0.06
Estrella Ave. San Andreas Rd. Playa Blvd. 2 Rubber Cape w/ 25% Digout 0.21
Estrella Ave. Playa Blvd. Arbolado Dr. 2 Rubber Cape w/10% Digout 0.07
Vista Dr. Playa Blvd. Playa Blvd. 2 Rubber Cape w/10% Digout 0.48
Loma Ave. Altivo Dr. San Andreas Rd. 2 Rubber Cape w/5% Digout 0.23
Elena Rd. Altivo Dr. E End 2 Rubber Cape w/10% Digout 0.13
Martin Rd. Pine Flat Rd Alta Vista 3 Rubber Cape w/15% Digout 1.10
Harmon St. Pine St. Oak 5 Rubber Cape w/5% Digout 0.05
Harmon St. 100' W/O Laurel St. ECM 5 Rubber Cape w/15% Digout 0.07
Lomond St. Laurel St. (East Edge) Hwy 9 5 Rubber Cape w/10% Digout 0.14
Oak St. Lorenzo St. Harmon St. 5 Rubber Cape w/10% Digout 0.29
Pine St. Lorenzo St. Harmon St. 5 Rubber Cape w/10% Digout 0.28
Laurel St. Hwy 236 Harmon St. 5 Rubber Cape w/15% Digout 0.23
Forest St. Hwy 9 Pine St. 5 Pulverize & 3" AC Rebuild 0.03
Forest St. East Lomond St. Hwy 9 5 Pulverize & 3" AC Rebuild 0.06
East Lomond St. Hwy 9 200' E/O Hwy 9 5 Pulverize & 3" AC Rebuild 0.04
East Lomond St. 200' E/O Hwy 9 Irwin Way 5 Rubber Cape w/5% Digout 0.16
Middleton Hwy 9 Junction Ave. 5 Rubber Cape w/5% Digout 0.13
Junction Middleton Ave. Lomond St. 5 Rubber Cape w/15% Digout 0.09
Railroad Ave. Lomond St. Middleton Ave. 5 Rubber Cape w/15% Digout 0.13
Total: 6.51
36
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-2 SUPERVISORIAL DISTRICT(S): 1, 2, 3, 5
MASTER PROJECT NUMBER: P 13402 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C, 6.C
2019 MEA SURE D
RESURFACIN G PROJECT
PROJECT TYPE: Pavement Management LOCATION: Countywide
FUNDING STATUS: F ully Funded PLANNING AREA: C ountywide
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
This project involves pavement preservation of County roadways, to be selected from the approved Measure D 5-year
plan. The project will involve resurfacing selected roadways, then restriping of the work area. Striping enhancements
for bicycle facilities will be considered and incorporated during the design phase of the project. The 2019 funding share
for District 4 was reserved for use in the 2020 Measure D Project.
IMPACT TO OPERATIONS:
Pavement preservation projects extend the life of the existing roadway by a minimum of 5 years and address current
maintenance needs such as pothole repair, surface protection, and restriping. This project will reduce maintenance needs on
project roadways for the life of the resurfacing treatment. This project will seal roadway surfaces. When regular preventative
maintenance such as surface sealing is not performed the roadway will continue to degrade until more costly measures are
required, ultimately requiring the roadway to be reconstructed at 3 to 4 times the cost of a surface seal.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,086,707 Measure D $ 2 ,700,000
Preliminary $ -
Design $ 172,376
Acquisition $ -
Construction $ 1,723,755
Other $ 202,133 Total Project Funding $ 2 ,700,000
Total Estimated Cost $ 2,098,264 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 100,935 $ 1,997,329 $ - $ - $ - $ - $ - $ - $ 2,098,264
37
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-2 SUPERVISORIAL DISTRICT(S): 1, 2, 3, 5
MASTER PROJECT NUMBER: P 13402 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN:
2019 MEASURE D
RESURFACING PROJECT LIST
Road Name Beginning Location Ending Location District Treatment Length
Maciel Ave. Mattison Ln. Capitola Rd. 1 Rubber Cape 0.32
Reinelt Ave. Woolpert Way. Byer Rd. 1 Rubber Cape w/Digouts 0.16
Thomas Ave. Chanticleer Ave. Reinelt Ave. 1 Rubber Cape w/Base Treatment 0.05
Rodriguez St. 17th Ave. Chanticleer Ave. 1 Rubber Cape w/Base Treatment 0.13
Del Mar Ct. 17th Ave. End 1 Rubber Cape 0.02
Catalina Dr. Axford Rd. N. End 1 Rubber Cape w/Base Treatment 0.12
Malibu Dr. Lotman Dr. Catalina Dr. 1 Rubber Cape w/Digouts 0.11
Axford Rd. W. End Lotman Dr. 1 Rubber Cape w/Digouts 0.14
Newport Ave. Malibu Dr. W. End 1 Rubber Cape 0.08
Thompson Ave. 78' S/Capitola Rd. Brommer St. 1 Rubber Cape w/Base Treatment 0.20
Thompson Ave. Brommer St. S. End 1 Rubber Cape w/Base Treatment 0.18
Bulb Ave. Garden St. Brommer St. 1 Rubber Cape w/Base Treatment 0.04
Bulb Ave. Brommer St. 1030' N/Brommer St. 1 Rubber Cape w/Base Treatment 0.20
Dee St. Thompson Ave. W. End 1 Rubber Cape w/Base Treatment 0.05
Rey Ct. Bulb Ave. E. End 1 Rubber Cape 0.03
Miller Hill Rd. Soquel San Jose Rd. Skyland Rd. 1 Spot Repairs 0.00
Miller Cutoff Miller Hill Rd. Soquel San Jose Rd. 1 Spot Repairs 0.00
Beach Dr. Aptos Beach Dr. S. End 2 Rubber Cape w/Base Treatment 0.75
Spreckles Dr. Treasure Island Ave. Aptos Beach Dr. 2 Rubber Cape w/Base Treatment 0.16
Bennett Rd. Aptos Beach Dr. Moose Head Dr. 2 Rubber Cape w/Digouts 0.09
Bennett Rd. Venetian Rd. Aptos Beach Dr. 2 Pulverize & 3" AC Rebuild 0.07
Hainline Rd Moose Head Dr. Venetian Rd. 2 Rubber Cape w/Digouts 0.14
Stephen Rd. Moose Head Dr. Aptos Beach Dr. 2 Rubber Cape w/Digouts 0.08
Stephen Rd. Aptos Beach Dr. Venetian Rd. 2 Rubber Cape 0.10
Venetian Rd. Stephen Rd. Aptos Beach Dr. 2 Pulverize & 3" AC Rebuild 0.15
Martin Rd. Alta Vista Rd. Ice Cream Grade 3 Rubber Cape w/Digouts 0.60
Brookside Ave. Love Creek Rd. Glen Arbor Rd. 5 Rubber Cape w/Digouts 0.47
Live Oak Ave. Glen Arbor Rd. Brookside Ave. 5 Rubber Cape w/Digouts 0.16
Pine St. Live Oak Ave. Manzanita Ave. 5 Rubber Cape w/Digouts 0.08
Whittier Ave. Brookside Ave. Manzanita Ave. 5 Rubber Cape w/Digouts 0.07
Love Creek Rd. Hwy 9 Brookside Ave. 5 Rubber Cape w/Digouts 0.47
Central Ave. Fillmore St. Love Creek Rd. 5 Rubber Cape 0.17
Sunnyside Ave. Love Creek Rd. Fairview Ave. 5 Rubber Cape w/Digouts 0.23
Main St. Sunnyside Ave. Hwy 9 5 Rubber Cape w/Digouts 0.15
Total: 5.77
38
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-3 SUPERVISORIAL DISTRICT(S): All
MASTER PROJECT NUMBER: P 13408 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C, 6.C
2020 MEA SURE D
RESURFACIN G PROJECT
PROJECT TYPE: Pavement Management LOCATION: Countywide
FUNDING STATUS: F ully Funded PLANNING AREA: C ountywide
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2020
DESCRIPTION & BACKGROUND:
This project involves pavement preservation of County roadways, to be selected from the approved Measure D 5-year
plan. The project will involve resurfacing selected roadways, then restriping of the work area. Striping enhancements
for bicycle facilities will be considered and incorporated during the design phase of the project.
IMPACT TO OPERATIONS:
Pavement preservation projects extend the life of the existing roadway by a minimum of 5 years and address current
maintenance needs such as pothole repair, surface protection, and restriping. This project will reduce maintenance needs on
project roadways for the life of the resurfacing treatment. This project will seal roadway surfaces. When regular preventative
maintenance such as surface sealing is not performed the roadway will continue to degrade until more costly measures are
required, ultimately requiring the roadway to be reconstructed at 3 to 4 times the cost of a surface seal.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,700,000 Measure D $ 2 ,700,000
Preliminary $ -
Design $ 210,000
Acquisition $ -
Construction $ 2,090,000
Other $ 400,000 Total Project Funding $ 2 ,700,000
Total Estimated Cost $ 2,700,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 2,700,000 $ - $ - $ - $ - $ - $ - $ 2,700,000
39
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-3 SUPERVISORIAL DISTRICT(S): All
MASTER PROJECT NUMBER: P 13408 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN:
2020 MEA SURE D
RESURFACIN G PROJECT
Road Name Beginning Location Ending Location District Treatment Length
Benedict Ave. Cabrillo Ave. W. End 1 Rubber Cape 0.02
Benson Ave. Thurber Ln. N. End / Tiffani Ct. 1 Rubber Cape w/Digouts 0.39
Bowman Ct. Benson Ave. S. End 1 Rubber Cape 0.02
Tiffani Ct. Benson Ave. S. End 1 Rubber Cape 0.13
Lillian Way N. End S. End 1 Rubber Cape w/Digouts 0.09
Sequoia Dr. Winkle Ave. Thurber Ln. 1 Rubber Cape w/Base Treatment 0.21
Twin Hills Dr. Thurber Ln. Lillian Way 1 Rubber Cape w/Base Treatment 0.16
Chirco Ave. S. End Germaine Ave. 1 Rubber Cape w/Base Treatment 0.19
Germaine Ave. S. End Cabrillo Ave. 1 Rubber Cape w/Digouts 0.13
Helen Ave. Thurber Ln. Pestana Ave. 1 Rubber Cape w/Digouts 0.11
Helen Ct. Helen Ave. S. End 1 Rubber Cape w/Digouts 0.06
Pestana Ave. Helen Dr. Germaine Ave. 1 Rubber Cape w/Digouts 0.29
Serrell Ave. Chirco Ave. W. End 1 Rubber Cape w/Base Treatment 0.10
Seacliff Dr. Santa Clara Ave. Broadway 2 Rubber Cape w/Digouts 0.54
Santa Cruz Ave. Broadway Seacliff Dr. 2 Rubber Cape w/Digouts 0.29
San Benito Ave. Seacliff Dr. Seacliff Dr. 2 Rubber Cape w/Digouts 0.13
East St. Santa Cruz Ave. Center Ave. 2 Rubber Cape w/Digouts 0.06
Valencia Ave. East St. Seacliff Dr. 2 Rubber Cape w/Digouts 0.23
Santa Clara Ave. Seacliff Dr. Center Ave. 2 Rubber Cape w/Digouts 0.17
El Camino Del Mar Seacliff Dr. Center Ave. 2 Rubber Cape w/Digouts 0.21
Lakeview Rd. State Highway 129 College Rd. 4 Rubber Cape w/Digouts 1.14
Plateau Dr. Hwy 9 Laurel Dr. 5 Rubber Cape w/Digouts 0.30
Valley Dr. Laurel Dr. Plateau Dr. 5 Rubber Cape w/Digouts 0.17
Laurel Dr. Hwy 9 Hillside Dr. 5 Rubber Cape w/Digouts 0.25
Ada Ave. Valley Dr. Plateau Dr. 5 Rubber Cape w/Digouts 0.07
Gushee St. N. Felton Empire Rd. Hihn St. 5 Rubber Cape w/Digouts 0.25
Gushee St. S. Hihn St. Laurel Dr. 5 Rubber Cape w/Digouts 0.19
Russell Ave. Hwy 9 Valley Dr. 5 Rubber Cape w/Digouts 0.10
Hihn St. Hwy 9 ECM Marker 5 Rubber Cape w/Digouts 0.22
Kirby St. Hwy 9 Gushee St. 5 Rubber Cape w/Digouts 0.04
Total 6.26
40
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-4 SUPERVISORIAL DISTRICT(S): All
MASTER PROJECT NUMBER: P 13407 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C, 6.C
2021 MEA SURE D
RESURFACIN G PROJECT
PROJECT TYPE: Pavement Management LOCATION: Countywide
FUNDING STATUS: F ully Funded PLANNING AREA: C ountywide
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2021
DESCRIPTION & BACKGROUND:
This project involves pavement preservation of County roadways, to be selected from the approved Measure D 5-year
plan. The project will involve resurfacing selected roadways, then restriping of the work area.
IMPACT TO OPERATIONS:
Pavement preservation projects extend the life of the existing roadway by a minimum of 5 years and address current
maintenance needs such as pothole repair, surface protection, and restriping. This project will reduce maintenance needs on
project roadways for the life of the resurfacing treatment. This project will seal roadway surfaces. When regular preventative
maintenance such as surface sealing is not performed the roadway will continue to degrade until more costly measures are
required, ultimately requiring the roadway to be reconstructed at 3 to 4 times the cost of a surface seal.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,700,000 Measure D $ 2 ,700,000
Preliminary $ -
Design $ 210,000
Acquisition $ -
Construction $ 2,090,000
Other $ 400,000 Total Project Funding $ 2 ,700,000
Total Estimated Cost $ 2,700,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 2 ,700,000 $ - $ - $ - $ - $ - $ 2,700,000
41
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-11 SUPERVISORIAL DISTRICT(S): 1, 5
MASTER PROJECT NUMBER: P 40657 DISTRICT/CSA: 9D1, 9D2, 9D3
OTHER PROJECT NUMBERS: P 40639, P40640, P40641, P40156 STRATEGIC PLAN: 3.C, 6.C
2020 RS TP-STIP
RESURFACIN G PROJECTS
PROJECT TYPE: Pavement Management LOCATION: Countywide
FUNDING STATUS: F ully Funded PLANNING AREA: V arious
PROJECT STATUS: Planned for Construction in Summer 2020 ESTIMATED COMPLETION DATE: 1 2/2020
DESCRIPTION & BACKGROUND:
This project involves resurfacing of the following County Roadways: Glen Arbor Rd (Hwy 9 to Hwy 9), Hihn Rd (Glen Arbor Rd to End), East
Zayante Rd (Quail Hollow Rd to Eagle Tree Ln), Upper Zayante Rd (Eagle Tree Ln to Hwy 35), West Vine Hill Rd (Hwy 17 to Vine Hill Rd),
Vine Hill Rd (West Vine Hill Rd to Branciforte Dr), Mountain View Rd (Branciforte Dr to North Rodeo Gulch Rd), North Rodeo Gulch Rd
(Spot Repairs), Laurel Glen Rd (North Rodeo Gulch Rd to Soquel San Jose Rd), Mount Hermon Rd (PM 1.31 to SV City Limit), Lockwood Ln
(100' N/O Graham Hill Rd to SV City Limit), Graham Hill Rd (Sims Rd to Lockwood Ln), Pioneer Rd (Amesti Rd to Green Valley Rd), Varni Rd
(Corralitos Rd to Amesti Rd), Empire Grade (PM 9.37 to PM 10.67).
IMPACT TO OPERATIONS:
Pavement preservation projects extend the life of the existing roadway by a minimum of 5 years and address current maintenance
needs such as pothole repair, surface protection, and restriping. When regular preventative maintenance such as surface sealing is
not performed the roadway will continue to degrade until more costly measures are required, ultimately requiring the roadway to
be reconstructed at 3 to 4 times the cost of a surface seal. We anticipate final project costs to be less than available budget, this
will be reconciled upon completion of the project.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 5,013,000 GW VEH IMPACT $ 9 95,748
STIP $ 2 ,582,000
Preliminary $ - RSTP $ 4 ,305,298
Design $ - SB1 $ 8 92,322
Acquisition $ -
Construction $ 5,863,407 $ -
Other $ 2,392,270 Total Project Funding $ 8 ,775,368
Total Estimated Cost $ 8,255,677 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 2 1,600 $ 8 ,405,438 $ - $ - $ - $ - $ - $ 8,427,038
42
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: FD-P-1 SUPERVISORIAL DISTRICT(S): All
MASTER PROJECT NUMBER: P 29065 DISTRICT/CSA: Flood Con trol and Water Cons.
OTHER PROJECT NUMBERS: P 26461 STRATEGIC PLAN: 1.A, 4.D
ENHANCED RAINFALL MO NITORING EQUIPMENT
X-BAND RAD AR FACILITY
PROJECT TYPE: Flood Control LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: C ountywide
PROJECT STATUS: Initial Planning and Design ESTIMATED COMPLETION DATE: 0 4/2023
DESCRIPTION & BACKGROUND:
This project includes building, deploying, and testing/configuring an X-band radar and making precipitation monitoring
and short-term forecast products available to appropriate flood and emergency response agencies throughout Santa
Cruz County, the Central Coast, and the Bay Area. Data will also be available to the Bay Area Advanced Quantitative
Precipitation Information (AQPI) system, to provide Bay Area regional integration of enhanced rainfall monitoring.
IMPACT TO OPERATIONS:
Santa Cruz County Flood Control and Water Conservation District staff will provide in-kind services to manage the
project and to administer the State grant awarded for project implementation. Approximately $20,000 per fiscal year
will be required to provide grant administration.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,122,020 DWR FERP Grant $ 7 25,468
District Funds $ 3 87,261
Preliminary $ - Outside Agency Contributions $ 85,000
Design $ - $ -
Acquisition $ 926,730 $ -
Construction $ 137,290 $ -
Other $ 133,709 Total Project Funding $ 1 ,197,729
Total Estimated Cost $ 1,197,729 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 1 5,176 $ 305,953 $ 8 76,600 $ - $ - $ - $ 0 $ 1,197,729
43
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: SW-P-1 SUPERVISORIAL DISTRICT(S): 2, 4
MASTER PROJECT NUMBER: P 52634 DISTRICT/CSA: FCSD
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
FREEDOM SEWER REHABILITATION
PHASE I
PROJECT TYPE: Sanitation LOCATION: South County
FUNDING STATUS: P ending USDA Grant Approval PLANNING AREA: P ajaro Valley
PROJECT STATUS: Out to bid ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
The project rehabilitates gravity sewer collection pipes in the Freedom County Sanitation District that are beyond their
useful life and rehabilitates sewer manholes within the project area. The project has two distinct areas: one is the
neighborhood located north of the Watsonville Municipal Airport (near Buena Vista Drive and Freedom Boulevard),
and the second is a within a portion of Green Valley Road (GVR).
IMPACT TO OPERATIONS:
Rehabilitating the sewer mains and manholes will serve to reduce infiltration and inflow, thus reducing flows and debris that
could lead to sanitary sewer overflows. The amount of flow and debris discharged to the Watsonville treatment plant will
likely be reduced, providing the District with lower treatment costs. All 6” mains will be increased to 8” mains, which are
easier to inspect and maintain. The main in GVR will be upsized to channel current flows. The project improvements will
decrease the costs of maintaining the sewer mains by approximately $20,000 each year.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 9,029,628 USDA Loan Funding $ 4 ,497,000
USDA Grant Funding $ 4 ,492,628
Preliminary $ 7,700 District Funds $ 40,000
Design $ 51,550 $ -
Acquisition $ 2,580 $ -
Construction $ 8,645,560 $ -
Other $ 322,238 Total Project Funding $ 9 ,029,628
Total Estimated Cost $ 9,029,628 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 125,000 $ 8 ,904,628 $ - $ - $ - $ - $ 9,029,628
44
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: SW-P-8 SUPERVISORIAL DISTRICT(S): 2, 4
MASTER PROJECT NUMBER: P 52636 DISTRICT/CSA: FCSD
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
FREEDOM SEWER REHABILITATION
PHA SE II
PROJECT TYPE: Sanitation LOCATION: South County
FUNDING STATUS: P ending SWRCB Grant Approval PLANNING AREA: P ajaro Valley
PROJECT STATUS: In Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This project would be the second phase of sewer main and manhole rehabilitation in the Freedom County Sanitation
District. Currently existing pipes and manholes are beyond their design life and deteriorating. Their condition leads to
inflow and infiltration of ground water, potential exfiltration of sewerage, and possible sanitary sewer overflows. The
exact location and extent of work will be determined by the amount of grant funding awarded.
IMPACT TO OPERATIONS:
Rehabilitating the sewer mains and manholes will serve to reduce infiltration and inflow , thus reducing flows and debris that
could lead to sanitary sewer overflows. The amount of flow and debris discharged to the Watsonville treatment plant will
likely be reduced, providing the District with lower treatment costs. All 6” mains will be increased to 8” mains, which are
easier to inspect and maintain. The project improvements will reduce the maintenance of the sewer mains by approximately
$10,000 each year.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 6,000,000 SWRCB Grant (pending) $ 6 ,000,000
$ -
Preliminary $ - $ -
Design $ 50,000 $ -
Acquisition $ - $ -
Construction $ 5,800,000 $ -
Other $ 150,000 Total Project Funding $ 6 ,000,000
Total Estimated Cost $ 6,000,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ - $ - $ - $ - $ - $ 6,000,000 $ 6 ,000,000
45
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-6 SUPERVISORIAL DISTRICT(S): 2, 4
MASTER PROJECT NUMBER: P 40264 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
GREEN VALLEY ROAD AT CA SSERLY CREEK TRIBUTARY
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: P ajaro Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2022
DESCRIPTION & BACKGROUND:
This project will replace the 25-foot-long concrete arch bridge on Green Valley Road over the Casserly Creek Tributary
near Watsonville. The bridge is being replaced due to its structural deficiency. The new bridge will be a two-lane
single-span concrete box girder with improved roadway approaches and improved fish passage.
IMPACT TO OPERATIONS:
The existing bridge has scour problems that require a considerable amount of monitoring and repairs. The new bridge
will be virtually maintenance-free for the first 25 years of its service life. This will account for a savings of
approximately $100,000 during this 25-year period from cost savings of maintenance of the deck and major scour
issues.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,251,700 Highway Bridge Program $ 2,047,000
State Exchange/Match $ 7,500
Preliminary $ 1 10,000
Design $ 3 40,000
Acquisition $ 1 10,000
Construction $ 1,817,200
Other $ - Total Project Funding $ 2,054,500
Total Estimated Cost $ 2,377,200 Funding Not Yet Identified $ 3 22,700
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 280,455 $ 5,541 $ 1 1,400 $ 50,000 $ 2 00,000 $ 1 ,800,000 $ 29,804 $ - $ 0 $ 2,377,200
46
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-7 SUPERVISORIAL DISTRICT(S): 1, 3, 5
MASTER PROJECT NUMBER: P 40579 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A, 3.C
PROJECT TYPE: Transportation and Roads LOCATION: Various
FUNDING STATUS: P artially Funded PLANNING AREA: C arbonera and North Coast
PROJECT STATUS: Design and Environmental, Anticipated ESTIMATED COMPLETION DATE: 1 2/2020
Construction FY 2020/2021
DESCRIPTION & BACKGROUND:
This project is to design and construct a new guardrail at multiple locations on La Madrona Drive, El Rancho Road, and
Swanton Road at Molino Creek Crossing. The project will replace existing guardrail and bring it up to current standards
on approximately 16 sites.
IMPACT TO OPERATIONS:
The existing guardrail is in very poor condition requiring maintenance crews to make difficult repairs on substandard
rails that in many instances are infeasible to repair. The new rail will be constructed to current standards and should
last many years with little maintenance required. Project will save $25,000 in maintenance and repair costs.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,301,520 Hwy Safety Improv. Fund $ 9 77,845
Transport. Improvement Fund $ 1 65,000
Preliminary $ 30,000
Design $ 195,000
Acquisition $ -
Construction $ 1,076,520
Other $ - Total Project Funding $ 1 ,142,845
Total Estimated Cost $ 1,301,520 Funding Not Yet Identified $ 1 58,675
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 57,336 $ 4 2,845 $ 1 ,100,000 $ - $ - $ - $ - $ 101,339 $ 1 ,301,520
47
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: FD-P-2 SUPERVISORIAL DISTRICT(S): 2, 4
MASTER PROJECT NUMBER: P 26407 DISTRICT/CSA: Flood Con trol Zone 7
OTHER PROJECT NUMBERS: P 26408 STRATEGIC PLAN: N/A
PAJARO RIVER FLOOD RI SK REDUCTION PROJECT
DESIGN AND CO NSTRUCTION
PROJECT TYPE: Flood Control LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: P ajaro Valley
PROJECT STATUS: Design Phase of Project Begins with Federal ESTIMATED COMPLETION DATE: T BD
Appropriations in Q4 of FY20/21
DESCRIPTION & BACKGROUND:
The U.S. Army Corps of Engineers’ (USACE) levees on the Pajaro River and Salsipuedes Creek were authorized for
reconstruction in 1966. The reconstruction project consists of three phases: Feasibility, Design (PED), and Construction.
The Design and Construction Phase begins in Q4 of fiscal year 2020/21 with receipt of the Director’s Report,
completion of the Feasibility Report from USACE, and federal appropriations that were secured in late 2019. The
5-year expenditure plan below is for Design and Construction only.
IMPACT TO OPERATIONS:
Design and Construction will require new sources of funding and a commitment from the federal government to build the project.
Additional ongoing staff time and cost-share contributions will be required to secure funding, and support Design and
Construction. During fiscal years 2020-21 and 2021-22 approximately $2,000,000 will be needed to fund both consultant and
in-kind services in support of initial design and construction work. Completion of the project will require additional operations and
maintenance (O&M) capabilities, currently unspecified.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 446,926,000 USACE $ 290,501,900
State DWR Subventions $ 109,496,870
Preliminary $ 5,600,000 Benefit Assessment $ 46,927,230
Design $ 3 4,269,000 $ -
Acquisition $ 140,076,000 $ -
Construction $ 211,378,000 $ -
Other $ 5 5,603,000 Total Project Funding $ 446,926,000
Total Estimated Cost $ 446,926,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 4 84,615 $ 757,884 $ - $ - $ - $ - $ 445,683,501 $ 446,926,000
48
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-8 SUPERVISORIAL DISTRICT(S): 1, 2, 4, 5
MASTER PROJECT NUMBER: P 40605 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40606, P40607 STRATEGIC PLAN: 3.A, 3.C
STRIPING AND GUARDRAIL
IMPROV EMENTS
PROJECT TYPE: Transportation and Roads LOCATION: Countywide
FUNDING STATUS: F ully Funded PLANNING AREA: C ountywide
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
This project is comprised of three Federal Highway Safety Improvement Program (HSIP) projects for upgraded guardrail
and striping in three geographical areas encompassing the entire county, North, Middle, and South. The three projects
will be constructed by 2019. North County, 38.5 striping miles / 1,215 guardrail feet; Central County, 18.6 striping
miles / 3,706 guardrail feet; South County, 12.3 striping miles.
IMPACT TO OPERATIONS:
County forces have a yearly program for striping County-maintained roads. This project will use a longer lasting striping on
these roads that will save a large amount of time and effort for County maintenance crews for many years. The existing
guardrail is in very poor condition requiring maintenance crews to make difficult repairs on substandard rails that in many
instances are infeasible to repair. The new rail will be constructed to current standards and should last many years with little
maintenance required. Project will save $32,00 in maintenance and repair costs.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,866,710 Hwy Safety Improv. Fund $ 2 ,606,100
General Road Fund $ 4 17,633
Preliminary $ 40,000
Design $ 412,500
Acquisition $ -
Construction $ 2,023,321
Other $ 287,405 Total Project Funding $ 3 ,023,733
Total Estimated Cost $ 2,763,226 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 486,002 $ 2 ,212,540 $ 6 4,684 $ - $ - $ - $ - $ - $ 0 $ 2,763,226
49
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-9 SUPERVISORIAL DISTRICT(S): 1, 3
MASTER PROJECT NUMBER: P 40595 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C
SWANTON ROAD AND OL D SANTA CRUZ HIGHWAY
CLEAN/PAINT STEEL BRIDGE MEMBERS
PROJECT TYPE: Bridge LOCATION: Various
FUNDING STATUS: P artially Funded PLANNING AREA: S ummit and North Coast
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2022
DESCRIPTION & BACKGROUND:
The project provides for blast cleaning and painting of steel girders and piling on the Swanton Road Bridge over Scott
Creek and the sidehill viaduct on Old Santa Cruz Highway.
IMPACT TO OPERATIONS:
The bridges have been identified by Caltrans as having corrosion issues on the steel members. The project will extend
the service life of the bridges and help prevent serious maintenance issues. This will account for a savings of
approximately $30,000 during the remaining life span of the bridges from cost savings of maintenance of the steel
members and possible structural damage.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 247,500 Highway Bridge Program $ 1 99,192
State Exchange/Match $ 2,250
Preliminary $ 40,000 $ -
Design $ 50,000 $ -
Acquisition $ - $ -
Construction $ 192,500 $ -
Other $ - Total Project Funding $ 2 01,442
Total Estimated Cost $ 282,500 Funding Not Yet Identified $ 81,058
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 41,757 $ 2,828 $ 2 ,000 $ 15,000 $ 7 0,000 $ 1 50,915 $ - $ - $ - $ 282,500
50
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS PROJECTS IN DISTRICT 1
51
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-5 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 79196 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C, 6.C
2018 FULL DE PTH RECYCLE
AND OVERL AY PROJECT
PROJECT TYPE: Pavement Management LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: C arbonera
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This project involves reconstruction of approximately 1.85 miles of Granite Creek Road from PM 0.56 to the Scotts
Valley City limits, and 0.62 miles of Branciforte Drive from PM 2.4 to Granite Creek Road. This project will extend the
life of this road so that it may continue to benefit the community. Striping enhancements for bicycle facilities were
considered and incorporated during the design phase of the project. Any funding that was not used on this project will
be applied to a future project.
IMPACT TO OPERATIONS:
Roadway reconstruction projects have a service life of approximately 20 years and reduce current maintenance needs such
as pothole repair, surface protection, and restriping on these roads for 10 plus years. This project will seal roadway surfaces.
When regular preventative maintenance such as surface sealing is not performed the roadway will continue to degrade until
more costly measures are required, ultimately requiring the roadway to be reconstructed at 3 to 4 times the cost of a surface
seal.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,534,000 RSTP/X/STBG $ 2 ,808,249
Preliminary $ -
Design $ 20,000
Acquisition $ -
Construction $ 2,681,087
Other $ 48,620 Total Project Funding $ 2 ,808,249
Total Estimated Cost $ 2,749,707 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 70,267 $ 2,679,441 $ - $ - $ - $ - $ - $ - $ - $ 2,749,707
52
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-39 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 40546 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40544 STRATEGIC PLAN: 3.A, 3.B
EAST CLIFF DRIVE FROM 7TH AVENUE TO 14TH AVENUE
PEDESTRIAN IM PROVEMENTS
PROJECT TYPE: Pedestrian Safety LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
This project is located along East Cliff Drive from 7th Avenue to 14th Avenue. The project involves the construction of
pedestrian and bike improvements. This project will provide connectivity and improve safety for pedestrian and
bicyclists.
IMPACT TO OPERATIONS:
The new curb, gutter and sidewalk will be virtually maintenance-free for the first 50 years of its service life. Pavement
will be resurfaced and extend the life of the existing roadway by a minimum of 5 years and address current
maintenance needs such as pothole repair, surface protection, and restriping. This project will reduce maintenance
costs by $50,000 on project roadways for the life of the resurfacing treatment.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 2,000,000 Roadside Improvement Fund $ 2 1,587
Transportation Improv. Fund $ 1 0,595
Preliminary $ 1,000,000 $ -
Design $ 1,800,000 $ -
Acquisition $ 500,000 $ -
Construction $ 8,500,000 $ -
Other $ 200,000 Total Project Funding $ 3 2,182
Total Estimated Cost $ 1 2,000,000 Funding Not Yet Identified $ 11,967,818
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 1 ,587 $ 20,000 $ 2 0,000 $ - $ - $ - $ 1 1,958,413 $ 12,000,000
53
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-42 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 40545 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40547 STRATEGIC PLAN: 3.A, 3.B
EAST CLIFF 17TH AVENUE TO PALISADES AVENUE
PEDESTRIAN IM PROVEMENTS
PROJECT TYPE: Pedestrian Safety LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
This project is located along East Cliff Drive from 17th Avenue to Palisades Avenue. The project involves the
construction of pedestrian and bike improvements. This project will provide connectivity and improve safety for
pedestrian and bicyclists.
IMPACT TO OPERATIONS:
The new curb, gutter and sidewalk will be virtually maintenance-free for the first 50 years of its service life. Pavement
will be resurfaced and extend the life of the existing roadway by a minimum of 5 years and address current
maintenance needs such as pothole repair, surface protection, and restriping. This project will reduce maintenance
costs of $85,000 on project roadways for the life of the resurfacing treatment.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 7,000,000 Roadside Improvement Fund $ 10,000
Transportation Improv. Fund $ 10,000
Preliminary $ 500,000 $ -
Design $ 1,000,000 $ -
Acquisition $ 400,000 $ -
Construction $ 5,000,000 $ -
Other $ 100,000 Total Project Funding $ 20,000
Total Estimated Cost $ 7,000,000 Funding Not Yet Identified $ 6 ,980,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 20,000 $ 1 5,000 $ - $ - $ - $ 6,965,000 $ 7 ,000,000
54
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-12 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 40024 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40357, P40358 STRATEGIC PLAN: 3.B, 3.C
MAIN S TREET
IMPROV EMENTS
PROJECT TYPE: Pedestrian Safety LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: S oquel
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This project is located along Main Street from Bridge Street intersection to approximately 600 feet south of Sevilla
Drive. The project involves the construction of approximately 730 linear feet of sidewalk, curb ramps, curb and gutter,
pavement resurfacing, widening and striping, signing and utility relocations, modifications, and installations along the
west side of Main Street.
IMPACT TO OPERATIONS:
Permanent preservation of the existing pavement within the project area, in addition to pavement widening, will
extend the design service life of Main Street and Bridge Street. It will also reduce the current maintenance for pothole
repair, surface protection, and restriping. This project will reduce maintenance costs of $3,000 on project roadways for
the life of the resurfacing treatment.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,250,000 Transportation Improve. Fund $ 1 93,382
Roadside Improvement Fund $ 5 99,116
Preliminary $ 50,000 Soquel Creek Water District $ 80,000
Design $ 190,500 Road Fund $ 2 00,658
Acquisition $ 6,000 $ -
Construction $ 810,000 $ -
Other $ 16,656 Total Project Funding $ 1 ,073,156
Total Estimated Cost $ 1,073,156 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 200,350 $ 869,678 $ 3 ,128 $ - $ - $ - $ - $ - $ - $ 1,073,156
55
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-13 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 40644 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40642 STRATEGIC PLAN: 3.A
SOQUEL DRIVE T O 41ST AVENUE
DEDICATED RIG HT TURN LANE
PROJECT TYPE: Road LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: S oquel
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
This project will add a dedicated right turn lane in the eastbound direction of Soquel Drive to 41st Avenue. This project
will improve traffic flow operations and safety through the intersection of Soquel Drive and 41st Avenue.
IMPACT TO OPERATIONS:
This project will add a dedicated right turn lane and therefore will add additional asphalt to the roadway. However, the
new asphalt section will have a service life of approximately 20 years and will not require any significant maintenance
for 10 plus years.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 550,000 Transportation Improv. Fund $ 5,000
Roadside Improvement Fund $ 5,000
Preliminary $ 20,000 $ -
Design $ 80,000 $ -
Acquisition $ 30,000 $ -
Construction $ 400,000 $ -
Other $ 20,000 Total Project Funding $ 10,000
Total Estimated Cost $ 550,000 Funding Not Yet Identified $ 5 40,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 10,000 $ 1 0,000 $ 1 0,000 $ 20,000 $ 20,000 $ 480,000 $ 550,000
56
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-14 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 40627 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40624 STRATEGIC PLAN: 3.A
SOQUEL DRIVE TO SOQUEL AVENUE
DEDICATED RIG HT TURN LANE
PROJECT TYPE: Road LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
This project will add a dedicated right turn lane in the eastbound direction of Soquel Drive to Soquel Avenue. This
project will improve traffic flow operations and safety through the intersection of Soquel Drive and Soquel Avenue.
IMPACT TO OPERATIONS:
This project will add a dedicated right turn lane and therefore will add additional asphalt to the roadway. However, the
new asphalt section will have a service life of approximately 20 years and will not require any significant maintenance
for 10 plus years.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 550,000 Transportation Improv. Fund $ 5,000
Roadside Improvement Fund $ 5,000
Preliminary $ 20,000 $ -
Design $ 80,000 $ -
Acquisition $ 30,000 $ -
Construction $ 400,000 $ -
Other $ 20,000 Total Project Funding $ 10,000
Total Estimated Cost $ 550,000 Funding Not Yet Identified $ 5 40,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 10,000 $ 1 0,000 $ 1 0,000 $ 20,000 $ 20,000 $ 480,000 $ 550,000
57
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-15 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 40028 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 22330, P40635, P40643, P40645 STRATEGIC PLAN: 3.A, 3.B
SOQUEL DRIVE AT R OBERTSON STREET
INTERSECTION S IGNALIZATION
PROJECT TYPE: Traffic Safety LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: S oquel
PROJECT STATUS: Preliminary Design ESTIMATED COMPLETION DATE: 2 024
DESCRIPTION & BACKGROUND:
This project involves the installation of a traffic signal to improve traffic flow at the intersection of Soquel Drive at
Robertson Street in the Town of Soquel. The intersection currently has three-way stop traffic control. Along with signal
installation there will also be improvements to curb ramps and roadway striping. The project will improve traffic flow
operations as well as pedestrian access through the area.
IMPACT TO OPERATIONS:
The new curb, gutter and sidewalk will be virtually maintenance-free for the first 50 years of its service life. The new
traffic signal will cost about $8,000 per year to maintain.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,094,113 Transportation Improv. Fund $ 10,000
Roadside Improvement Fund $ 10,000
Preliminary $ 10,000 CSA 9 $ 50,000
Design $ 150,000 Road Fund $ 1 00,000
Acquisition $ 20,000 $ -
Construction $ 914,113 $ -
Other $ - Total Project Funding $ 1 70,000
Total Estimated Cost $ 1,094,113 Funding Not Yet Identified $ 9 24,113
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 5 0,000 $ 25,000 $ 6 0,000 $ 5 0,000 $ 909,113 $ - $ - $ 1,094,113
58
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-16 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 40629 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40626 STRATEGIC PLAN: 3.A
WIDEN CAPITOLA ROAD FROM 7TH AVENUE TO 17TH AVENUE
FROM TWO LANES TO FOUR LANES
PROJECT TYPE: Road LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
This project will widen Capitola Road from 7th Avenue to 17th Avenue from two lanes to four and will improve traffic
flow operations on Capitola Road from 7th Avenue to 17th Avenue.
IMPACT TO OPERATIONS:
Roadway reconstruction projects have a service life of approximately 20 years and reduce current maintenance costs
of $75,000 such as pothole repair, surface protection, and restriping on this road section for 10 plus years.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,240,000 Transportation Improv. Fund $ 5,000
Roadside Improvement Fund $ 5,000
Preliminary $ 45,000 $ -
Design $ 190,000 $ -
Acquisition $ 10,000 $ -
Construction $ 950,000 $ -
Other $ 45,000 Total Project Funding $ 10,000
Total Estimated Cost $ 1,240,000 Funding Not Yet Identified $ 1 ,230,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 10,000 $ 1 0,000 $ 2 5,000 $ 80,000 $ 120,000 $ 995,000 $ 1 ,240,000
59
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-17 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: P 40625 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40628 STRATEGIC PLAN: 3.A
WIDEN CAPITOLA ROAD FROM CHAN TICLEER AVENUE TO 30TH AVENUE
FROM TWO LANES TO FOUR LANES
PROJECT TYPE: Road LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
This project will widen Capitola Road from Chanticleer Avenue to 30th Avenue from two lanes to four and will improve
traffic flow operations on Capitola Road from Chanticleer Avenue to 30th Avenue.
IMPACT TO OPERATIONS:
Roadway reconstruction projects have a service life of approximately 20 years and reduce current maintenance costs
of $65,0000 such as pothole repair, surface protection, and restriping on this road section for 10 plus years.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,050,000 Transportation Improv. Fund $ 5,000
Roadside Improvement Fund $ 5,000
Preliminary $ 40,000 $ -
Design $ 160,000 $ -
Acquisition $ 10,000 $ -
Construction $ 800,000 $ -
Other $ 40,000 Total Project Funding $ 10,000
Total Estimated Cost $ 1,050,000 Funding Not Yet Identified $ 1 ,040,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 10,000 $ 1 0,000 $ 2 0,000 $ 60,000 $ 110,000 $ 840,000 $ 1 ,050,000
60
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS PROJECTS IN DISTRICT 2
61
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-18 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 40591 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40084, P40090, P22352, P21012, P40655 STRATEGIC PLAN: 3.A, 3.B, 3.C
APTOS VILLAGE PLA N IMPROVEMENTS
PHASE I AND II
PROJECT TYPE: Road LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Phase I Construction Complete ESTIMATED COMPLETION DATE: 2 020
Phase II Design
DESCRIPTION & BACKGROUND:
Phase I - Constructed road and roadside improvements on Soquel Drive and Trout Gulch Road that includes: new traffic signal at
Soquel Drive/Trout Gulch Road, modified railroad crossing over Trout Gulch Road, new bus pullout on Soquel Drive, drainage
improvements, ADA-compliant pedestrian improvements, and new bike lanes on Trout Gulch Road. Phase II - Construct road and
roadside improvements on Soquel Drive from Trout Gulch Road to Aptos Creek Bridge to include: new traffic signal at Soquel Drive/
Aptos Creek Road, new railroad crossing over Aptos Creek Road, sidewalk and bike lanes on Soquel Drive.
IMPACT TO OPERATIONS:
Roadway reconstruction projects have a service life of approximately 20 years and reduce current maintenance costs
of $40,000 on this section road for 10 plus years. The two new traffic signals will cost about $16,000 per year to
maintain.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 5,800,000 RSTPX Grant $ 3 ,570,000
TDA Grant $ 1 35,000
Preliminary $ 75,000 Transportation Impact Fund $ 7 00,000
Design $ 600,000 Roadside Impact Fund $ 6 00,000
Acquisition $ 85,000 CSA 9 $ 3 99,400
Construction $ 5,932,194 Road Fund $ 1 ,987,794
Other $ 700,000 Total Project Funding $ 7 ,392,194
Total Estimated Cost $ 7,392,194 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 4 ,144,576 $ 600,811 $ 5 00,000 $ 2 ,146,807 $ - $ - $ - $ - $ 0 $ 7,392,194
62
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-25 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 13001 DISTRICT/CSA: 9D3
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C, 6.C
BUENA VIS TA DRIVE
ROAD REHABILIT ATION PROJECT
PROJECT TYPE: Road LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Andreas
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 1 2/2021
DESCRIPTION & BACKGROUND:
This project will involve the reconstruction of Buena Vista Drive from State Highway 1 to San Andreas Road. This
project will use refuse vehicle impact fees for project funding, as the County landfill located on Buena Vista Drive is a
primary refuse vehicle destination. The project will also incorporate measures to address existing roadway flooding
issues. The current intent is to complete this project by 2021 but details of this project are still pending. As this project
is finalized, changes may be made to the proposed budget and/or estimated completion date.
IMPACT TO OPERATIONS:
Roadway reconstruction projects have a service life of approximately 20 years and reduce current maintenance needs
such as pothole repair, surface protection, and restriping on these roads for 10 plus years.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 5,600,000 Green Waste Veh. Impact $ 5 ,600,000
$ -
Preliminary $ - $ -
Design $ 400,000 $ -
Acquisition $ - $ -
Construction $ 4,300,000 $ -
Other $ 900,000 Total Project Funding $ 5 ,600,000
Total Estimated Cost $ 5,600,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 3 ,359 $ 3 ,198,083 $ - $ - $ - $ - $ 2,398,558 $ 5 ,600,000
63
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: RL-P-1 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 51003 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 4.B, 4.D, 6.C
BUENA VIST A LANDFILL
MINI-F LARE
PROJECT TYPE: Landfill LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Andreas
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: 2 020
DESCRIPTION & BACKGROUND:
Design and install Landfill gas mini-flare for burning of landfill gases. Watsonville will be sharing 1/3 of the costs of this
project as part of their existing agreement with the Buena Vista Landfill. This project number is also used for the
maintenance of the existing landfill gas system. The project financial information below reflects the cost for only this
project.
IMPACT TO OPERATIONS:
The new flare will supplement the landfill gas control and conveyance system by adding a third gas destruction device that
will work in concert with the co-gen facility and existing flare. It will help to better extract gas from the landfill and control
surface emissions and subsurface migration of gas per Federal and State compliance requirements. This in turn will minimize
staff time required to monitor gas probes and costs associated with mitigating and implementing gas migration corrective
measures.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,000,000 City of Watsonville $ 337,767
Gate Revenue $ 533,671
Preliminary $ - CSA 9C Tax Assessment $ 141,862
Design $ 113,300 $ -
Acquisition $ - $ -
Construction $ 900,000 $ -
Other $ - Total Project Funding $ 1,013,300
Total Estimated Cost $ 1,013,300 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 46,800 $ 9 66,500 $ - $ - $ - $ - $ - $ - $ 1,013,300
64
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: RL-P-3 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 51053 DISTRICT/CSA: 9C
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 4.B, 4.C
BUENA VIST A LANDFILL
ORGANICS PROC ESSING FACILITY
PROJECT TYPE: Landfill LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Andreas
PROJECT STATUS: Contract Approved for Design and Permitting ESTIMATED COMPLETION DATE: 2 021
DESCRIPTION & BACKGROUND:
Design and construct a compost facility at the Buena Vista Landfill. State law mandates that by 2021, all residents and
businesses will be required to compost food scraps. In order to comply, the County must locate a facility that can accept and
process the anticipated volumes from Santa Cruz County households and businesses. Due to a lack of such facilities across
the State, siting a compost facility within our County is within our best interests. Funding for the design costs for this project
are within the budget for Disposal Facilities Siting Program - Long Range Planning (625110/62330/P51323).
IMPACT TO OPERATIONS:
There will be ongoing costs to staff and operate the facility. There will be much greater volumes of trash being
diverted out of the landfill and into the compost facility. Costs will likely increase due to increased labor and new
marketing costs. The current organics operations cost the County $1,306,500 per year. We anticipate this cost to go up
with the new facility by a minimum of $200,000 per year.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 6,000,000 CSA 9C $ 51,891
Gate Revenue $ 1 95,209
Preliminary $ - $ -
Design $ 247,100 $ -
Acquisition $ - $ -
Construction $ 5,752,900 $ -
Other $ - Total Project Funding $ 2 47,100
Total Estimated Cost $ 6,000,000 Funding Not Yet Identified $ 5 ,752,900
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 247,100 $ - $ - $ - $ - $ 5,752,900 $ 6 ,000,000
65
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: RL-P-4 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 51055 DISTRICT/CSA: 9C
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 4.B, 4.C, 6.C, 6.D
BUENA VIST A LANDFILL
TRANSFER STATION
PROJECT TYPE: Landfill LOCATION: South County
FUNDING STATUS: P artially funded PLANNING AREA: S an Andreas
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: 2 025
DESCRIPTION & BACKGROUND:
Design and construct a transfer station at the Buena Vista Landfill. Per the most recent aerial survey, the Buena Vista Landfill
is estimated to be filled to capacity within twelve years at the current rate of disposal. The County does not have any further
space to construct a new module, and a transfer station is necessary to ensure that the County will have a local facility to
sort and process materials from its’ residents and businesses. Funding for the preliminary costs for this project are within the
budget for Disposal Facilities Siting Program - Long Range Planning (625110/62330/P51323).
IMPACT TO OPERATIONS:
During the construction phase, there may be significant disruption due to continuing landfill operations that will need
to continue during construction. There will be ongoing costs to staff and operate the facility. During the period in which
the transfer station and the landfill are operating simultaneously, there may be increased costs to operations. There
will be added costs as well for debt payments that will be part of the necessary funding structure.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2 0,000,000 CSA 9C $ 17,599
Gate Revenue $ 66,207
Preliminary $ 83,806 $ -
Design $ 2,000,000 $ -
Acquisition $ - $ -
Construction $ 2 0,000,000 $ -
Other $ - Total Project Funding $ 83,806
Total Estimated Cost $ 2 2,083,806 Funding Not Yet Identified $ 22,000,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 1 5,000 $ 68,806 $ - $ - $ - $ - $ 22,000,000 $ 22,083,806
66
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: FD-P-3 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 24811 DISTRICT/CSA: Zone 7/PS DMD
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 4.B, 4.D
PROJECT TYPE: Flood Control LOCATION: South County
FUNDING STATUS: P ending (Federal) PLANNING AREA: P ajaro Valley
PROJECT STATUS: Anticipated Start: Summer 2020 ESTIMATED COMPLETION DATE: 1 2/2022
DESCRIPTION & BACKGROUND:
The proposed Project is a Coastal Ecosystem Resiliency Project in the Lower Watsonville Slough. The purpose of the
Project is to conduct feasibility analysis and initial design for a mostly nature-based infrastructure project that
re-establishes and enhances wetland and tidal marsh habitat while providing flood risk reduction, climate change
adaptation and recreational opportunities to economically disadvantaged local residents.
IMPACT TO OPERATIONS:
There are no impacts to operations, since this is a feasibility and initial project design study. Some staff time will be
required to provide in-kind support for the project.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,700,000 OPC Prop 1 Grant Award $ 8 50,000
USACE CAP Sec. 1135 $ 8 50,000
Preliminary $ 1,470,000 District funds $ 27,941
Design $ 230,000 $ -
Acquisition $ - $ -
Construction $ - $ -
Other $ 27,941 Total Project Funding $ 1 ,727,941
Total Estimated Cost $ 1,727,941 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 12,941 $ 1 5,000 $ 150,000 $ 5 0,000 $ 1 ,500,000 $ - $ - $ 0 $ 1,727,941
67
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: SW-P-2 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 52611 DISTRICT/CSA: FCSD
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
MONUMEN T AVENUE
SEWER EX TENSION
PROJECT TYPE: Sanitation LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: P ajaro Valley
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
There was a sanitary sewer overflow along a public sewer main that crossed two private properties. The Freedom
County Sanitation District completed this project to abandon the sewer main crossing the private properties and
replace it with an extended sewer main that connects the existing main in Monument Avenue to the City of
Watsonville’s trunk line on the Watsonville Airport property. We anticipate final project costs to be less than the
estimated project costs, final costs are being reconciled with the completion of the project.
IMPACT TO OPERATIONS:
It is far better to maintain a sewer main in a public road, than on private property. This relocation also removes the
risk of the sewer main overflowing on the private properties. The new main is a new 8” diameter PVC line that will be
easier to maintain and inspect than the old 6” diameter clay line. The improvements to the sanitary sewer main
resulted in saving of approximately $4,000 each fiscal year.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 75,000 District Funds $ 1 27,000
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 127,000 $ -
Other $ - Total Project Funding $ 1 27,000
Total Estimated Cost $ 127,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 5,035 $ 1 03,847 $ - $ - $ - $ - $ - $ 18,118 $ 127,000
68
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-20 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 40603 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 21023 STRATEGIC PLAN: 3.A, 3.B, 3.C
PINEHURST AN D GREENBRIER
PEDESTRIAN IM PROVEMENTS
PROJECT TYPE: Pedestrian Safety LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: 1 2/2022
DESCRIPTION & BACKGROUND:
This project is located in Rio del Mar at Rio del Mar Elementary School and consists of designing and constructing new
ADA ramps, curb, gutter and sidewalk. It will also include restriping the crosswalks and repairing the curb and gutter
damaged by tree roots. This project will improve pedestrian operations and disabled access by filling in a gap in the
sidewalk system and adding ADA curb ramps.
IMPACT TO OPERATIONS:
The new curb, gutter and sidewalk will be virtually maintenance-free for the first 50 years of its service life.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 190,000 TDA Grant $ 90,000
Road Fund $ 1 00,000
Preliminary $ - $ -
Design $ 20,000 $ -
Acquisition $ 25,000 $ -
Construction $ 130,000 $ -
Other $ 15,000 Total Project Funding $ 1 90,000
Total Estimated Cost $ 190,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 27,338 $ - $ - $ 100,000 $ 6 2,662 $ - $ - $ - $ 0 $ 190,000
69
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: CSA-P-1 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 40067 DISTRICT/CSA: CSA 2
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 4.A
PLACE DE M ER (CSA 2)
STAIR R EPAIR
PROJECT TYPE: 2017 Storm Damage LOCATION: La Selva
FUNDING STATUS: F ully Funded PLANNING AREA: S outh County
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This project was part of the 2017 winter storms that affected CSA 2 Place de Mer. Heavy rains caused damage to the drainage pipe that
runs under the stairs. This CSA is unique in that it includes sanitation, as well as other services such as security and beach access. This
project was considered part of the Roads division due to the involvement of the drainage pipe. Project included removing and replacing
the existing 15” SD pipe and seepage collars, clearing and grubbing, importing soil, backfilling and recompacting all eroded areas, erosion
control and cleaning and connecting the existing outlet structure which will provide safe beach access.
IMPACT TO OPERATIONS:
This project has extended the service life of the stairs by approximately 20 years. The anticipated costs during the next 20 years are
$3,000 per year for vegetation control and minor repairs as needed. The impact to the community is the restoration of beach
access to a location that is popular for fishing, surfing and other beach activities.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 100,000 General Roads Fund Balance $ 94,987
$ -
Preliminary $ - $ -
Design $ 10,000 $ -
Acquisition $ - $ -
Construction $ 84,987 $ -
Other $ - Total Project Funding $ 94,987
Total Estimated Cost $ 94,987 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 2,140 $ 24,856 $ 6 7,991 $ - $ - $ - $ - $ - $ - $ 94,987
70
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-21 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 40354 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
REDWOOD ROAD AT BRO WN’S CREEK TRIBUTARY
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: P ajaro Valley
PROJECT STATUS: Construction ESTIMATED COMPLETION DATE: 0 6/2020
DESCRIPTION & BACKGROUND:
This project will replace the 28-foot-long single lane Redwood Road Bridge over the Brown’s Creek Tributary northeast
of the Town of Corralitos. The bridge is being replaced due to its substandard geometry and structural deficiency. The
new bridge will be a two-lane, single-span concrete slab to meet current standards with improved roadway
approaches.
IMPACT TO OPERATIONS:
The existing steel bridge, timber deck and rail are in continuous need of maintenance. The rail and timber walkway have
been damaged numerous times. The new bridge will be virtually maintenance-free for the first 25 years of its service life.
This will account for a savings of approximately $40,000 during this 25-year period from cost savings of continual
maintenance and replacement of boards of the timber walkways and railings as well as the savings from not having to
perform maintenance on the deck.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,490,500 State Exchange/Match $ 3 37,528
Highway Bridge Project $ 3 ,375,286
Preliminary $ 110,000 $ -
Design $ 451,000 $ -
Acquisition $ 55,000 $ -
Construction $ 3,096,814 $ -
Other $ - Total Project Funding $ 3 ,712,814
Total Estimated Cost $ 3,712,814 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 680,208 $ 2 ,105,598 $ 5 89,838 $ - $ 3 37,170 $ - $ - $ - $ - $ 3,712,814
71
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: FD-P-5 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 26303 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40621 STRATEGIC PLAN: 3.A, 4.D, 6.C
RIO DEL M AR FLATS
DRAINAGE PROJECT
PROJECT TYPE: Drainage LOCATION: South County
FUNDING STATUS: P artially Funded / Funding Pending PLANNING AREA: A ptos
PROJECT STATUS: Completed Design, Ready for Construction ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This project includes construction of a pump and concrete vault, new storm drain pipes, and inlet and outlet structures.
These improvements will help alleviate flooding in the Rio Del Mar Flats area. We are seeking additional grant funding
for the construction of the project. Design plans and specifications were completed. Estimated completion date is not
yet known, pending funding acquisition.
IMPACT TO OPERATIONS:
Will require funding to maintain the pumps, drainage system, and water quality units. Estimated maintenance cost is
$147,787.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 4,925,072 Zone 6 $ 5 40,820
Road Operations $ 2 60,516
Preliminary $ 249,326 FEMA (received) $ 6 01,693
Design $ 709,955 FEMA (pending) $ 3 ,602,028
Acquisition $ - Prop 1 (pending) $ 5 99,904
Construction $ 4,399,708 $ -
Other $ 245,972 Total Project Funding $ 5 ,604,961
Total Estimated Cost $ 5,604,961 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 733,164 $ 140,127 $ 7 5,000 $ 340,256 $ - $ - $ - $ - $ 4,316,414 $ 5 ,604,961
72
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-22 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 40237 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40226, P40227, P22407, P21016 STRATEGIC PLAN: 3.A, 3.B, 3.C
STATE PARK DRIVE IMPROVEMENTS
SEACLIFF VILLAGE
PROJECT TYPE: Road LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Design, Environmental ESTIMATED COMPLETION DATE: 2 021
DESCRIPTION & BACKGROUND:
This project is to design and construct road, roadside, streetscape, lighting, and landscaping improvements per the
Seacliff Village Plan on State Park Drive, Santa Cruz Avenue, Broadway, and Center Avenue and coordinate with the
utility underground project.
IMPACT TO OPERATIONS:
Roadway reconstruction projects have a service life of approximately 20 years and reduce current maintenance costs
of $75,000 on these roads for 10 plus years.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,000,000 Transportation Impact Fund $ 6 66,515
Roadside Impact Fund $ 2 15,292
Preliminary $ 200,000 Road Fund $ 3 41,911
Design $ 700,000 $ -
Acquisition $ - $ -
Construction $ 3,181,375 $ -
Other $ - Total Project Funding $ 1 ,223,718
Total Estimated Cost $ 4,081,375 Funding Not Yet Identified $ 2 ,857,657
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 1 ,068,950 $ 32,002 $ 3 7,766 $ 85,000 $ 2 ,857,657 $ - $ - $ - $ 0 $ 4,081,375
73
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-23 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: P 40141 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C
VALENCIA ROAD AT VALENCIA CREEK A ND SPRECKELS DRIVE AT APTOS CREEK
BRIDGE EMBANKMENT A ND SCOUR PROTECTION
PROJECT TYPE: Bridge LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2022
DESCRIPTION & BACKGROUND:
The project will consist of providing bridge embankment and scour protection of the abutments of the Valencia Road
Bridge at Valencia Creek and the Spreckels Drive Bridge at Aptos Creek.
IMPACT TO OPERATIONS:
The existing bridges have been identified by Caltrans as having scour issues at the abutments. The project will extend
the service life of the bridges and help prevent serious maintenance issues. This will account for a savings of
approximately $30,000 during the remaining life span of the bridge from cost savings of maintenance of the scour
issues and possible structural damage.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 192,500 Highway Bridge Program $ 1 54,928
State Exchange/Match $ 25,239
Preliminary $ 25,000 Public Facilities Fees/RIF/TIF $ 2,500
Design $ 30,000 $ -
Acquisition $ 5,000 $ -
Construction $ 160,000 $ -
Other $ - Total Project Funding $ 1 82,667
Total Estimated Cost $ 220,000 Funding Not Yet Identified $ 37,333
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 25,239 $ 2,946 $ 2 ,000 $ 5,000 $ 5 ,000 $ 1 79,815 $ - $ - $ 0 $ 220,000
74
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS PROJECTS IN DISTRICT 3
75
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: SW-P-3 SUPERVISORIAL DISTRICT(S): 3
MASTER PROJECT NUMBER: P 51842 DISTRICT/CSA: DCSD
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
DAVENPORT DRINKING W ATER IMPROVEMENTS
PHAS E III
PROJECT TYPE: Water LOCATION: North County
FUNDING STATUS: P ending Grant Approval PLANNING AREA: N orth Coast
PROJECT STATUS: In Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This project includes the construction of approximately 320 feet of new water main within Old Coast Road, east of Fair
Avenue. The improvements include new domestic water service laterals, water meters, new fire service laterals, and a
new fire hydrant. An application for State Water Resources Control Board grant financing has been submitted and is
under review.
IMPACT TO OPERATIONS:
The project replaces an aging existing water main that is undersized to meet the project area’s fire service needs. The
new water main extends the service life of the water system. The new water meters allow the Davenport County
Sanitation District to measure water use for parcels that are currently unmetered. The installation of new water
meters would reduce operational costs by approximately $60,000 over the life expectancy of the new water main.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 215,000 State Water Board (pending) $ 2 15,000
$ -
Preliminary $ 30,000 $ -
Design $ 25,000 $ -
Acquisition $ - $ -
Construction $ 299,700 $ -
Other $ - Total Project Funding $ 2 15,000
Total Estimated Cost $ 354,700 Funding Not Yet Identified $ 1 39,700
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 3,769 $ - $ 3 ,200 $ 70,000 $ 2 77,731 $ - $ - $ - $ - $ 354,700
76
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: SW-P-4 SUPERVISORIAL DISTRICT(S): 3
MASTER PROJECT NUMBER: P 51841 DISTRICT/CSA: DCSD
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 4.B
DAVEN PORT
RECYCLED WA TER PROJECT
PROJECT TYPE: Sanitation LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: N orth Coast
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This construction project upgraded the treatment facility to disinfected tertiary treated water, constructed a new
storage pond and truck fill station and dredged the existing wastewater storage lagoon.
IMPACT TO OPERATIONS:
The existing treatment plant used spray fields to discharge treated effluent and when the fields were overly saturated of a new recycled
water pond and truck fill station allows for a local farmer to use the recycled water, thus removing the need for the spray fields.
Dredging the lagoon allows for approximately 8 feet of additional storage. By dredging the existing lagoon and increasing the wastewater
volume capacity of the lagoon by 800,000 gallons the project eliminated any future incident of the lagoon reaching overcapacity and the
requiring hauling of the wastewater with a cost between $20,000 to $150,000, depending on the duration of rain events.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 4,334,584 DWR Grant $ 178,662
CDBG Grant $ 1,395,349
Preliminary $ 598,294 SWRCB Grant $ 3,165,867
Design $ 349,933 District Funds $ 423,730
Acquisition $ - $ -
Construction $ 4,205,257 $ -
Other $ 10,124 Total Project Funding $ 5,163,608
Total Estimated Cost $ 5,163,608 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 2 ,609,959 $ 2 ,537,477 $ 1 6,173 $ - $ - $ - $ - $ - $ - $ 5,163,608
77
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-24 SUPERVISORIAL DISTRICT(S): 3
MASTER PROJECT NUMBER: P 49001 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40394 STRATEGIC PLAN: 3.A
SWANTON ROA D AT BIG CREEK
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: N orth Coast
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2023
DESCRIPTION & BACKGROUND:
This project provides for the replacement of the 80-foot-long Swanton Road Bridge over the Big Creek near the town
of Davenport. The bridge is being replaced due to its substandard deck geometry and its vulnerability to scour. The
new bridge will be a two-lane, single-span bridge with an improved alignment.
IMPACT TO OPERATIONS:
The existing bridge requires periodic maintenance due to poor deck joints, timber bridge posts on railing and scour
issues. The new bridge will be virtually maintenance-free for the first 25 years of its service life. This will account for a
savings of approximately $100,000 during this 25-year period from cost savings of maintenance of the deck and major
scour issues.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,794,000 Highway Bridge Project $ 2 ,540,000
$ -
Preliminary $ 110,000 $ -
Design $ 440,000 $ -
Acquisition $ 165,000 $ -
Construction $ 2,079,000 $ -
Other $ - Total Project Funding $ 2 ,540,000
Total Estimated Cost $ 2,794,000 Funding Not Yet Identified $ 2 54,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 13,875 $ 220,707 $ 3 83,054 $ 150,000 $ 4 00,000 $ 1 ,600,000 $ 26,364 $ - $ - $ 2,794,000
78
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS PROJECTS IN DISTRICT 4
79
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-26 SUPERVISORIAL DISTRICT(S): 4
MASTER PROJECT NUMBER: P 40174 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40573, P40288, P22348, P40006 STRATEGIC PLAN: 3.A, 3.B, 3.C
HOLOHAN ROAD AT HIGHWAY 152
INTERSECTION IM PROVEMENTS
PROJECT TYPE: Road LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: P ajaro Valley
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: 2 021
DESCRIPTION & BACKGROUND:
Construct operational and school safety improvements at the intersection of Holohan Road at Highway 152 including:
adding a left turn lane, a dedicated right turn lane, and extending existing lanes on the Holohan Road approach, adding
a merge lane to Hwy 152 westbound to accommodate the additional left turn lane and pedestrian and bicycle
improvements. The project will significantly improve vehicle operations through the intersection and improve safety
for bicyclists and pedestrians.
IMPACT TO OPERATIONS:
This project will add additional asphalt to the roadway. However, the new asphalt section will have a service life of
approximately 20 years and will not require any significant maintenance for 10 plus years.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,600,000 STIP Grant $ 892,000
RSTX Grant $ 385,000
Preliminary $ 605,725 Minor A Grant $ 500,000
Design $ 425,351 Transportation Improv. Fund $ 8 7,000
Acquisition $ 300,000 Roadside Improvement Fund $ 5,000
Construction $ 3,198,244 Road Fund $ 190,000
Other $ - Total Project Funding $ 2,059,000
Total Estimated Cost $ 4,529,320 Funding Not Yet Identified $ 2,470,320
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 820,356 $ 158,214 $ 4 1,076 $ - $ - $ - $ - $ - $ 3,509,674 $ 4 ,529,320
80
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: SW-P-6 SUPERVISORIAL DISTRICT(S): 4
MASTER PROJECT NUMBER: P 52623 DISTRICT/CSA: FCSD
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
PROJECT TYPE: Sanitation LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: P ajaro Valley
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This project improved drainage at the Los Arboles Pump Station in the Freedom County Sanitation District. Pre-project
stormwater entered the pump station’s wet well and vaults which could overwhelm the station and cause spills. The
project added storm drain inlets as well as culverts to capture and redirect water away from the pump station. The
awarded bid came in lower than the expected budget amount of $200,000.
IMPACT TO OPERATIONS:
This project has reduced pump run times, thus extending the life of the pumps in this station as well as at the downstream
pump station. Additionally, Operations crews will no longer have to sand bag the station or respond frequently during rain
events. The probability of a sanitary sewer overflow has been greatly reduced due to these improvements. The drainage
improvements reduced the maintenance and operational costs approximately $4,000 each year.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 200,000 District Funds $ 1 55,000
$ -
Preliminary $ - $ -
Design $ 5,000 $ -
Acquisition $ - $ -
Construction $ 148,066 $ -
Other $ - Total Project Funding $ 1 55,000
Total Estimated Cost $ 153,066 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 153,066 $ - $ - $ - $ - $ - $ - $ - $ 153,066
81
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: SW-P-7 SUPERVISORIAL DISTRICT(S): 4
MASTER PROJECT NUMBER: P 52635 DISTRICT/CSA: FCSD
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 6.C
TREMBLEY LAN E LIFT STATION
PUMP REPLACEM ENT/RELOCATION
PROJECT TYPE: Sanitation LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: P ajaro Valley
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This construction project will replace the existing wet well, pumps, force main, and associated piping and electrical
conduits. The new pumps will be installed in a new subsurface wet well to be located in the Trembley Lane roadway,
along with a new valve vault and flow meter vault. The existing force main extending from the station to Green Valley
Road will be replaced. This project is necessary to improve the reliability and functionality of the sewer system.
IMPACT TO OPERATIONS:
Pre-project the Freedom County Sanitation District operations crew had to modify the system, temporarily, to keep the
sewage from overflowing. This fix required close monitoring and crews had to respond to multiple high-water alarms at the
facility. This project includes a larger wet well, replaced pumps, and upgrades the system. Operations will no longer have to
respond to the alarms caused by the failing system. As the system is new, it will require less maintenance. The improvements
to the pump station have decreased the maintenance and operational costs by approximately $7,000 each year.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 967,480 District Funds $ 1 ,353,682
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 1,353,682 $ -
Other $ - Total Project Funding $ 1 ,353,682
Total Estimated Cost $ 1,353,682 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 62,562 $ 737,320 $ 5 53,800 $ - $ - $ - $ - $ - $ 0 $ 1,353,682
82
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS PROJECTS IN DISTRICT 5
83
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: RL-P-4 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 51056 DISTRICT/CSA: 9C
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 4.C, 6.C
BEN LOMOND TR ANSFER STATION
LIGHTING RETR OFIT PROJECT
PROJECT TYPE: Recycling and Solid Waste LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
Upgrade lighting inside the transfer station to brighter and more efficient lighting. The lighting system was outdated,
dim, and required an upgrade for safety and efficiency. PG&E offered no interest on-bill financing for lighting
retrofit projects. Due to the efficiency of the new lighting system, there will not be an increase to our total monthly
PG&E bill, and the loan will be completely paid off within 56 months. The loan included $13,450 incentive from PG&E.
IMPACT TO OPERATIONS:
The job was completed during business hours, with minimal impact to operations. The estimated annual energy
savings per PG&E is $16,126.40.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 100,000 PG&E On-Bill Financing $ 8 7,120
PG&E Incentive $ (13,450)
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 73,670 $ -
Other $ - Total Project Funding $ 7 3,670
Total Estimated Cost $ 73,670 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 5,262 $ 15,786 $ 1 5,786 $ 1 5,786 $ 15,786 $ 5,264 $ - $ 73,670
84
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: RL-P-2 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 51604 DISTRICT/CSA: 9C
OTHER PROJECT NUMBERS: P 51360 STRATEGIC PLAN: 4.B, 6.C
BEN LO MOND
SEDIMENT PO ND REPAIR
PROJECT TYPE: Recycling and Solid Waste LOCATION: North County
FUNDING STATUS: F ully Funded - Ben Lomond Closure Budget PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This project repaired the existing stormwater discharge sediment pond at the Ben Lomond Landfill. The repair involved
removing existing age-deteriorated galvanized pipe and replacing with high-density polyethylene pipe (HDPE), removal
and replacement of spillway and hydroseeding of disturbed soil area. There will be a Board action to move additional
appropriations to this project to cover the final costs listed below.
IMPACT TO OPERATIONS:
Project increased capacity of pond and allows increased settling time for sediment to be removed from stormwater before discharging off-site. It
also restores ability to manually open valve to discharge settled stormwater as needed between storm events. Restored and properly functioning
pond will improve stormwater discharge quality in compliance with the Ben Lomond Transfer Station and Landfill Stormwater Pollution
Prevention Plan as required by the State Water Resources Board. This project is considered to be a Best Management Practices (BMPs) and helps
to lower costs of maintenance and managing stormwater runoff. Maintaining compliance also saves the potential costs associated with outside
litigation and fines from the State.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 146,500 CSA 9C $ 28,796
Gate Revenue $ 1 08,326
Preliminary $ - $ -
Design $ 13,000 $ -
Acquisition $ - $ -
Construction $ 115,000 $ -
Other $ 9,122 Total Project Funding $ 1 37,122
Total Estimated Cost $ 137,122 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 2,118 $ 135,004 $ - $ - $ - $ - $ - $ - $ - $ 137,122
85
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: CSA-P-2 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 50040 DISTRICT/CSA: CSA 7
OTHER PROJECT NUMBERS: P 50042 STRATEGIC PLAN: 6.C
BOULDER CREEK WASTEW ATER TREATMENT PLANT
EQUALIZATION TANK AN D MIXER REPLACEMENT
PROJECT TYPE: Sanitation LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Planning ESTIMATED COMPLETION DATE: 0 5/2021
DESCRIPTION & BACKGROUND:
The equalization tank is used as a holding basin after the influent leaves the grinder and allows for optimization of the
wastewater treatment plant during variation of flows. The equalization tank was designed to include a mixer to mix the
equalization effluent and provide a uniform flow and composition to the aeration tank.
IMPACT TO OPERATIONS:
During high levels of discharge, wastewater is diverted to the equalization tank and is held there before treatment or removed by hauling
to prevent a sanitary sewer overflow. Without a mixer in the equalization tank, the grease mats build up. Removing grease mats increases
maintenance cost. Replacement of the equalization tank would eliminate the need of hauling wastewater during a rain event or when
there are too many solids that could enter the leach pits, putting the treatment plant in violation. Hauling expenses could vary between
$20,000 to $150,000 depending on the duration of the rain event and how soon the treatment plant could be returned to service.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 325,000 CSA 7 Fund Reserves $ 325,000
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 100,000 $ -
Other $ 225,000 Total Project Funding $ 325,000
Total Estimated Cost $ 325,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 325,000 $ - $ - $ - $ - $ - $ 325,000
86
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-27 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 48047 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
BRIMBLECOM ROAD AT SAN LORENZO RIVER
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Preliminary Design ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
The project will replace the 105-foot-long single-lane, steel treadway bridge north of the Town of Boulder Creek. The
bridge is being replaced due to its substandard deck geometry and corrosion issues on the steel members. The new
bridge will be a two-lane, single-span post-tensioned concrete box girder bridge with improved roadway approaches.
IMPACT TO OPERATIONS:
The existing bridge requires considerable amount of maintenance from crews due to the spalling concrete deck and timber
walkways. The new bridge will be virtually maintenance-free for the first 25 years of its service life. This will account for a
savings of approximately $75,000 during this 25-year period from cost savings of continual maintenance and replacement of
boards of the timber walkways and railings as well as the savings from not having to perform maintenance on the deck.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 3,020,600 Highway Bridge Program $ 2 ,746,000
Local Road Funds $ 20,000
Preliminary $ 110,000 $ -
Design $ 506,000 $ -
Acquisition $ 110,000 $ -
Construction $ 2,294,600 $ -
Other $ - Total Project Funding $ 2 ,766,000
Total Estimated Cost $ 3,020,600 Funding Not Yet Identified $ 2 54,600
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 2,173 $ - $ - $ 20,000 $ 5 0,000 $ 5 0,000 $ 50,000 $ 50,000 $ 2,798,427 $ 3 ,020,600
87
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-28 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40375 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C
CONFERENCE DRIVE AT ZAYANTE CREEK
BRIDGE SCOUR MITIGATION
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2022
DESCRIPTION & BACKGROUND:
This project will repair scour that has developed under an existing pier footing on the Conference Drive Bridge at
Zayante Creek. Construction will consist of building a concrete cutoff wall in the front of the existing footing and
repairing the scoured area.
IMPACT TO OPERATIONS:
County crews must currently monitor the scour hole after major storm events. The project will repair the current scour
damage as well as prevent future scour to the footing. This will account for a savings of approximately $30,000 during
the remaining life span of the bridge from cost savings of maintenance of the scour issues and possible structural
damage.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 454,300 Highway Bridge Program $ 4 13,000
$ -
Preliminary $ 75,000 $ -
Design $ 75,000 $ -
Acquisition $ 55,000 $ -
Construction $ 338,800 $ -
Other $ - Total Project Funding $ 4 13,000
Total Estimated Cost $ 543,800 Funding Not Yet Identified $ 1 30,800
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 81,210 $ - $ 2 ,992 $ 5,000 $ 1 5,000 $ 4 39,598 $ - $ - $ - $ 543,800
88
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-29 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40596 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.C
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2022
DESCRIPTION & BACKGROUND:
This project will repair the existing bridge on East Zayante Road at Zayante Creek. The repair will involve chipping away
loose materials to get to sound concrete in spalled areas, sandblasting the rebar to remove corrosion, painting a
zinc-rich primer onto the exposed rebar, then patching the concrete with a fast-set mortar or other concrete suitable
for the application.
IMPACT TO OPERATIONS:
The bridge has considerable spalling in need of repair before more considerable structural damage occurs to the bridge
affecting its serviceability. The project will extend the service life of the bridge. This will account for a savings of
approximately $30,000 during the remaining life of the bridge cost savings of continual maintenance of the deck
spalling and possibly future structural damage.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 100,000 Highway Bridge Program $ 79,677
Local Road Funds $ 10,323
Preliminary $ 50,000 $ -
Design $ 20,000 $ -
Acquisition $ - $ -
Construction $ 71,500 $ -
Other $ - Total Project Funding $ 90,000
Total Estimated Cost $ 141,500 Funding Not Yet Identified $ 51,500
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 42,517 $ 5,445 $ 2 ,000 $ 10,000 $ 5 ,000 $ 7 6,538 $ - $ - $ - $ 141,500
89
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-30 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40150 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
EITHER WAY AT SA N LORENZO RIVER
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
This project will replace the 59-foot-long Either Way Bridge over the San Lorenzo River, north of Boulder Creek. The
bridge is being replaced due to substandard geometry and structural deficiency. The project will consist of completely
replacing the narrow, load-limited, single-lane bridge with a new two-lane bridge to meet current standards.
IMPACT TO OPERATIONS:
The existing bridge needs annual maintenance to the deck and timber walkway as well as addressing scour issues. The
new bridge will be virtually maintenance-free for the first 25 years of its service life. This will account for a savings of
approximately $50,000 during this 25-year period from cost savings of continual maintenance and replacement of
boards of the timber walkways and railings as well as the savings from not having to perform maintenance on the deck.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,325,400 Highway Bridge Program $ 2 ,114,000
State Exchange/Match $ 9,651
Preliminary $ 110,000 Local Roads Match $ 1 58,101
Design $ 209,000 $ -
Acquisition $ 220,000 $ -
Construction $ 1,786,400 $ -
Other $ - Total Project Funding $ 2 ,281,752
Total Estimated Cost $ 2,325,400 Funding Not Yet Identified $ 43,648
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 159,613 $ 2,880 $ 5 ,453 $ 50,000 $ 5 0,000 $ 7 5,000 $ 150,000 $ - $ 1,832,454 $ 2 ,325,400
90
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-31 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40353 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
FERN DRIVE AT SAN LORENZO RIVER
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2023
DESCRIPTION & BACKGROUND:
This project will replace the 72-foot-long Fern Drive Bridge over the San Lorenzo River near Boulder Creek. The bridge
is being replaced due to its substandard geometry and structural deficiency. The project will replace the narrow
single-lane bridge with a two-lane single-span concrete box girder bridge to meet current standards and improved
roadway approaches.
IMPACT TO OPERATIONS:
The bridge has numerous maintenance issues that require attention from County crews annually. The new bridge will
be virtually maintenance-free for the first 25 years if its service life. This will account for a savings of approximately
$50,000 during this 25-year period from cost savings of continual maintenance and replacement of boards of the
timber walkways and railings as well as the savings from not having to perform maintenance on the deck.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,344,100 Highway Bridge Program $ 2,548,000
State Exchange/Match $ 2 3,450
Preliminary $ 90,000 Local Road Funds $ 2 31,350
Design $ 5 00,000 $ -
Acquisition $ 2 00,000 $ -
Construction $ 2,012,800 $ -
Other $ - Total Project Funding $ 2,802,800
Total Estimated Cost $ 2,802,800 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 316,012 $ 3,016 $ 2 24,265 $ 50,000 $ 2 50,000 $ 1 ,800,000 $ 159,507 $ 0 $ 2,802,800
91
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-32 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40352 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
FOREST HILL DRIV E AT BEAR CREEK
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2023
DESCRIPTION & BACKGROUND:
This project will replace the 70-foot-long Forest Hill Drive Bridge over Bear Creek northeast of the Town of Boulder
Creek. The bridge is being replaced due to its structural deficiency. The new bridge will be a two-lane single-span
concrete slab bridge to meet current design standards.
IMPACT TO OPERATIONS:
The bridge has numerous deck spalling issues requiring crews to periodically make repairs. There are also scour
problems at the abutments that need attention from County forces every few years. The new bridge will be virtually
maintenance-free for the first 25 years of its service life. This will account for a savings of approximately $30,000 during
this 25-year period from cost savings of continual maintenance of the deck and railings as well as scour issues.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,179,100 Highway Bridge Program $ 1,981,000
State Exchange/Match $ 7,140
Preliminary $ 1 10,000 Local Road Funds $ 1 43,777
Design $ 2 03,500 $ -
Acquisition $ 1 10,000 $ -
Construction $ 1,755,600 $ -
Other $ - Total Project Funding $ 2,131,917
Total Estimated Cost $ 2,179,100 Funding Not Yet Identified $ 4 7,183
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 150,173 $ 4,730 $ 8 ,214 $ 50,000 $ 5 0,000 $ 2 00,000 $ 1 ,700,000 $ - $ 15,984 $ 2,179,100
92
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-33 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 48042 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A, 3.C
LA MADRO NA DRIVE
GUARDRAIL R EPLACEMENT
PROJECT TYPE: Traffic Safety LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: C arbonera
PROJECT STATUS: Complete ESTIMATED COMPLETION DATE: C omplete
DESCRIPTION & BACKGROUND:
This project is to design and construct a new guardrail on La Madrona Drive at 0.2 miles south of Silverwood Drive and
new guardrail at the location of existing substandard guardrail on La Madrona Drive near Via Vinca.
IMPACT TO OPERATIONS:
The existing guardrail is in very poor condition requiring maintenance crews to make difficult repairs on substandard
rails that in many instances are infeasible to repair. The new rail will be constructed to meet current standards and
should last many years with little maintenance required. This project will save $2,000 in maintenance costs. Final
project costs are being reconciled with the completion of the project.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 352,000 HSIP Grant $ 1 94,578
Road Fund $ 1 73,466
Preliminary $ 20,000 $ -
Design $ 45,000 $ -
Acquisition $ - $ -
Construction $ 303,044 $ -
Other $ - Total Project Funding $ 3 68,044
Total Estimated Cost $ 368,044 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 9,478 $ 98,920 $ 2 59,646 $ - $ - $ - $ - $ - $ 0 $ 368,044
93
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-34 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40576 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: P 40396 STRATEGIC PLAN: 3.A
LARKSPUR STREET AT SAN LORENZO RIVER
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2023
DESCRIPTION & BACKGROUND:
The project will replace the Larkspur Street Bridge over the San Lorenzo River in the Town of Brookdale. The bridge is
being replaced due to its substandard deck geometry and being scour critical. The project will consist of completely
replacing the existing narrow one-lane structure and roadway approaches with a two-lane bridge and standard bridge
approaches.
IMPACT TO OPERATIONS:
The timber railing requires continual maintenance by County maintenance personnel. The bridge also has scour issues
beneath pier walls that will require major maintenance if the bridge is not replaced. The new bridge will be virtually
maintenance-free for the first 25 years of its service life. This will account for a savings of approximately $30,000 during
this 25-year period from cost savings of continual maintenance of the deck and railings as well as scour issues.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 4,189,900 Highway Bridge Program $ 3,809,000
State Exchange/Match $ 1 0,336
Preliminary $ 1 10,000 Local Road Funds $ 1 46,550
Design $ 4 23,500 $ -
Acquisition $ 6 60,000 $ -
Construction $ 2,996,400 $ -
Other $ - Total Project Funding $ 3,965,886
Total Estimated Cost $ 4,189,900 Funding Not Yet Identified $ 2 24,014
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 166,936 $ 15,998 $ 2 4,031 $ 50,000 $ 5 0,000 $ 7 50,000 $ 3 ,000,000 $ - $ 132,935 $ 4 ,189,900
94
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-35 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40148 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
LOMPICO ROAD AT LOMPICO CREEK
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2023
DESCRIPTION & BACKGROUND:
This project will replace the 21-foot-long Lompico Road Bridge over Lompico Creek at Creekwood Drive, north of the
Town of Felton. The bridge is being replaced due to its substandard geometry and structural deficiency. The new bridge
will be a single-span, concrete slab bridge to meet current standards and improve fish passage.
IMPACT TO OPERATIONS:
The existing bridge requires continual maintenance due to scour issues at the bridge and roadway approach retaining wall.
The bridge railing has also been hit many times requiring crews to make repairs and replace members. The new bridge will
be virtually maintenance-free for the first 25 years of its service life. This will account for a savings of approximately $30,000
during this 25-year period from cost savings of continual maintenance of the deck and railings as well as scour issues.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 2,046,440 Highway Bridge Program $ 1,860,400
$ -
Preliminary $ 1 10,000 $ -
Design $ 3 12,400 $ -
Acquisition $ 50,600 $ -
Construction $ 1,573,440 $ -
Other $ - Total Project Funding $ 1,860,400
Total Estimated Cost $ 2,046,440 Funding Not Yet Identified $ 1 86,040
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 46,974 $ 7,143 $ 6 ,023 $ 75,000 $ 5 0,000 $ 1 00,000 $ 1 ,600,000 $ - $ 161,300 $ 2 ,046,440
95
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-58 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40662 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
PLEASANT WAY AT S AN LORENZO RIVER
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Preliminary Design ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
The project will replace the 57-foot-long single-lane, steel pontoon bridge north of the Town of Boulder Creek. The
bridge is being replaced due to its substandard deck geometry and corrosion issues on the steel members. The new
bridge will be a two-lane, single-span post-tensioned concrete box girder bridge with improved roadway approaches.
IMPACT TO OPERATIONS:
The existing bridge requires considerable amount of maintenance from crews due to the spalling concrete deck and timber
walkways. The new bridge will be virtually maintenance-free for the first 25 years of its service life. This will account for a
savings of approximately $50,000 during this 25-year period form cost savings of continual maintenance and replacement of
boards of the timber walkways railings as well as the savings from not having to perform maintenance on the deck.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 4,114,000 Highway Bridge Program $ 3 ,740,000
$ -
Preliminary $ 100,000 $ -
Design $ 532,500 $ -
Acquisition $ 1,100,000 $ -
Construction $ 2,381,500 $ -
Other $ - Total Project Funding $ 3 ,740,000
Total Estimated Cost $ 4,114,000 Funding Not Yet Identified $ 3 74,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 5 ,000 $ 75,000 $ 1 50,000 $ 2 00,000 $ 200,000 $ 1 ,000,000 $ 2 ,484,000 $ 4 ,114,000
96
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-36 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40307 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
QUAIL HOLLOW ROAD AT ZAYANTE CREEK
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design, Environmental, and Right-of-Way ESTIMATED COMPLETION DATE: 1 2/2023
DESCRIPTION & BACKGROUND:
This project will replace the 84-foot-long Quail Hollow Road Bridge over Zayante Creek, northeast of the Town of
Felton. The bridge is being replaced due to its substandard geometry and structural deficiency. The new bridge will be
a two-lane, single-span concrete box girder with improved roadway approaches.
IMPACT TO OPERATIONS:
The existing bridge requires constant maintenance to the spalling concrete deck, roadway approaches, and the timber
railing which has been hit many times. The new bridge will be virtually maintenance-free for the first 25 years of its
service life. This will account for a savings of approximately $60,000 during this 25-year period from cost savings of
continual maintenance of the deck and railings as well as scour issues.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 3,599,200 Highway Bridge Program $ 2,860,876
State Exchange/Match $ 6,500
Preliminary $ 1 10,000 Local Road Funds $ 4 58,402
Design $ 5 50,000 $ -
Acquisition $ 5 50,000 $ -
Construction $ 2,587,200 $ -
Other $ - Total Project Funding $ 3,325,778
Total Estimated Cost $ 3,797,200 Funding Not Yet Identified $ 4 71,422
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 458,402 $ 2,528 $ 3 8,609 $ - $ 4 0,000 $ 5 00,000 $ 2 ,700,000 $ - $ 57,661 $ 3,797,200
97
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-37 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40154 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
RANCHO RIO AVENU E AT NEWELL CREEK
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Design and Environmental ESTIMATED COMPLETION DATE: 1 2/2023
DESCRIPTION & BACKGROUND:
This project will replace the 38-foot-long Rancho Rio Avenue Bridge over Newell Creek in Ben Lomond. The bridge is
being replaced due to its substandard deck geometry and abutment scour. The project will consist of completely
replacing the existing, narrow one-lane bridge with a two-lane bridge and improved roadway approaches.
IMPACT TO OPERATIONS:
The existing bridge requires maintenance from County crews to the spalling concrete deck and the timber walkways. The
bridge also has scour issues at the abutments requiring attention. The new bridge will be virtually maintenance-free for the
first 25 years of its service life. This will account for a savings of approximately $40,000 during this 25-year period from cost
savings of continual maintenance and replacement of boards of the timber walkways and railings as well as the savings from
not having to perform maintenance on the deck.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,843,600 Highway Bridge Program $ 1,676,000
State Exchange/Match $ 7,294
Preliminary $ 82,500 Local Road Funds $ 1 38,115
Design $ 1 48,500 $ -
Acquisition $ 2 75,000 $ -
Construction $ 1,337,600 $ -
Other $ - Total Project Funding $ 1,821,409
Total Estimated Cost $ 1,843,600 Funding Not Yet Identified $ 2 2,191
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 147,531 $ 10,781 $ 9 ,994 $ 50,000 $ 5 0,000 $ 2 00,000 $ 1 ,200,000 $ 150,000 $ 25,294 $ 1,843,600
98
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-38 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40172 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
SAN LORENZO WAY AT SAN LORENZO RIVER
BRIDGE REP LACEMENT
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: 2021 Construction ESTIMATED COMPLETION DATE: 1 2/2021
DESCRIPTION & BACKGROUND:
The project will replace the San Lorenzo Way Bridge, over San Lorenzo River in Felton. The bridge is being replaced due
to its substandard load capacity, deck geometry, approach alignment and structural deficiency. The project will consist
of completely replacing the existing one-lane structure and roadway approaches with a two-lane clear span concrete
box girder bridge and standard bridge approaches.
IMPACT TO OPERATIONS:
Timber bridge deck on existing bridge requires maintenance workers to do work on the bridge multiple times per year. The
timber railing also gets damaged often, requiring members to be replaced. The new bridge will be virtually maintenance-free
for the first 25 years of its service life. This will account for a savings of approximately $100,000 during this 25-year period
from cost savings of continual maintenance and replacement of the timber decking and railings.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 3,396,800 Highway Bridge Program $ 6,095,000
SB1 $ 5 1,235
Preliminary $ 1 65,000 State Exchange/Match $ 1 3,719
Design $ 6 00,000 $ -
Acquisition $ 1 50,000 $ -
Construction $ 5,309,357 $ -
Other $ - Total Project Funding $ 6,159,954
Total Estimated Cost $ 6,224,357 Funding Not Yet Identified $ 6 4,403
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 938,678 $ 170,753 $ 4 33,011 $ 2 ,000,000 $ 2 ,500,000 $ - $ - $ - $ 181,915 $ 6 ,224,357
99
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: R-P-57 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: P 40661 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A
TWO BAR ROAD AT TWO BAR CREEK
BRIDGE REHA BILITATION
PROJECT TYPE: Bridge LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo Valley
PROJECT STATUS: Preliminary Design ESTIMATED COMPLETION DATE: 1 2/2025
DESCRIPTION & BACKGROUND:
The project will rehabilitate and widen the 31-foot-long single-lane, steel treadway bridge north of the Town of
Boulder Creek. The bridge is being rehabilitated due to its substandard deck geometry and corrosion issues on the
steel members. The rehabilitated bridge will be a two-lane, single-span bridge to meet current design standards with
improved roadway approaches.
IMPACT TO OPERATIONS:
The existing bridge requires considerable amount of maintenance from crews due to the spalling concrete deck and
scour issues. The rehabilitated bridge will be virtually maintenance-free for the next 25 years. This will account for a
savings of approximately $30,000 during this 25 year period form cost savings of continual maintenance of the deck
and railings as well as scour issues to keep occurring.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,865,600 Highway Bridge Program $ 1 ,696,000
$ -
Preliminary $ 75,000 $ -
Design $ 294,000 $ -
Acquisition $ 110,000 $ -
Construction $ 1,386,000 $ -
Other $ - Total Project Funding $ 1 ,696,000
Total Estimated Cost $ 1,865,000 Funding Not Yet Identified $ 1 69,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 5 ,000 $ 75,000 $ 5 0,000 $ 5 0,000 $ 50,000 $ 50,000 $ 1,585,000 $ 1 ,865,000
100
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS DISASTER RECOVERY PROJECTS
101
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: Various SUPERVISORIAL DISTRICT(S): All
MASTER PROJECT NUMBER: V arious DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A, 3.C
MARCH 2011 ST ORM DAMAGE
VARIOUS P ROJECTS
PROJECT TYPE: Disaster Recovery LOCATION: Countywide
FUNDING STATUS: F ully Funded PLANNING AREA: C ountywide
PROJECT STATUS: Construction, Design, and Environmental ESTIMATED COMPLETION DATE: V arious
DESCRIPTION & BACKGROUND:
The County experienced a number of damaged sites during the March 2011 storm event to the roadway system.
Emergency Proclamations were approved for funding of these sites through the Federal Highways Administration
(FHWA) with insurance covering the local roads. Most of the sites have been repaired and the others currently in the
design and environmental phase.
IMPACT TO OPERATIONS:
The multiple sites need to be protected from further damage requiring extensive amount of time from County
resources. The repaired sites will require very little maintenance from County forces once completed.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 8,750,000 Federal HWY Admin. (FHWA) $ 1,400,000
Insurance $ 1 7,350,000
Preliminary $ 950,000 $ -
Design $ 3,750,000 $ -
Acquisition $ 500,000 $ -
Construction $ 1 3,550,000 $ -
Other $ - Total Project Funding $ 1 8,750,000
Total Estimated Cost $ 1 8,750,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 14,347,667 $ 1 ,146,382 $ 8 83,630 $ 120,000 $ 1 ,000,000 $ 1 ,000,000 $ - $ - $ 252,321 $ 18,750,000
102
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: Various SUPERVISORIAL DISTRICT(S): All
MASTER PROJECT NUMBER: V arious DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A, 3.C
2016 STORM DAMAGE
VARIOUS P ROJECTS
PROJECT TYPE: Disaster Recovery LOCATION: Countywide
FUNDING STATUS: P artially Funded PLANNING AREA: C ountywide
PROJECT STATUS: Construction, Design, and Environmental ESTIMATED COMPLETION DATE: V arious
DESCRIPTION & BACKGROUND:
The County experienced a number of damaged sites during 2016 storms to the roadway system. Emergency
Proclamations were approved for funding of these sites through the Federal Highways Administration (FHWA) and the
California Office of Emergency Services (CalOES). Funding approval has been secured for these sites with many of the
sites having been repaired already and the others currently in the design and environmental phase.
IMPACT TO OPERATIONS:
The multiple sites need to be protected from further damage requiring extensive amount of time from County
resources. The repaired sites will require very little maintenance from County forces once completed.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 9,025,000 Federal HWY Admin. (FHWA) $ 1,500,500
CalOES $ 5,705,500
Preliminary $ 200,000 General Fund Loan $ 1,819,000
Design $ 2,200,000 $ -
Acquisition $ 50,000 $ -
Construction $ 6,575,000 $ -
Other $ - Total Project Funding $ 9,025,000
Total Estimated Cost $ 9,025,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 1 ,537,754 $ 756,608 $ 1,375,523 $ 719,000 $ 2 ,500,000 $ 1 ,500,000 $ - $ - $ 636,115 $ 9 ,025,000
103
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: Various SUPERVISORIAL DISTRICT(S): All
MASTER PROJECT NUMBER: V arious DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: N /A STRATEGIC PLAN: 3.A, 3.C
WINTER 2017 ST ORM DAMAGE
VARIOUS P ROJECTS
PROJECT TYPE: Disaster Recovery LOCATION: Countywide
FUNDING STATUS: P artially Funded PLANNING AREA: C ountywide
PROJECT STATUS: Various stages of Construction and Design ESTIMATED COMPLETION DATE: V arious
DESCRIPTION & BACKGROUND:
The County experienced a significant amount of damage from winter 2017 storms to the roadway system.
Emergency Proclamations were approved for funding of these sites through the Federal Highways Administration
(FHWA), the Federal Emergency Management Agency (FEMA), and the California Office of Emergency Services
(CalOES). There were over 200 sites damaged during the storms that are in need of repair throughout the County.
IMPACT TO OPERATIONS:
The multiple sites will need to be protected from further damage requiring extensive amount of time from County
resources. The repaired sites will require very little maintenance from County forces once completed.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 110,000,000 Federal Hwy Admin (FHWA) $ 4 9,576,800
FEMA $ 4 0,500,000
Preliminary $ 2,200,000 CalOES $ 1 4,942,400
Design $ 2 2,000,000 SB1 $ 4 ,980,800
Acquisition $ 2,200,000 $ -
Construction $ 8 3,600,000 $ -
Other $ - Total Project Funding $ 110,000,000
Total Estimated Cost $ 110,000,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 24,029,843 $ 10,163,709 $ 8,318,807 $ 25,274,000 $ 2 2,000,000 $ 15,000,000 $ 4 ,500,000 $ - $ 713,641 $ 110,000,000
104
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2011 Storm Projects
Anticipated Original
Sup. 2019/20 2020/21
CIP # Project # Project Name Status Year of Damage
District EAs Budget
Construction Estimate
S2011-P-1 P79082 5 2011 Nelson Rd Slide Completed 2015 $1,500,000 $12,380 $0
S2011-P-2 P79088 5 2011 March Bean Creek PM 1.00 Completed 2019 $650,000 $423,762 $0
S2011-P-3 P79092 5 2011 March Felton Empire PM 2.58 ER20EO(011) Completed 2018 $400,000 $142,636 $0
S2011-P-4 P79104 5 2011 March Mt Charlie Rd PM 3.63 60% design, right of way needed 2022 $733,000 $10,790 $40,000
S2011-P-5 P79121 1 2011 March Mt View PM .44 95% design, permits / right of way needed 2021 $214,000 $9,775 $50,000
S2011-P-6 P79143 2 2011 March Eureka Cyn Rd PM .36 ER20E0(010) Completed 2019 $290,000 $250,108 $0
S2011-P-7 P79144 5 2011 March Glenwood Dr PM .21 ER20E0(012) Completed 2018 $395,000 $3,146 $0
S2011-P-8 P79146 2 2011 March Main St PM 1.10 ER20E0(014) Geotech complete, 30% design 2023 $660,000 $0 $30,000
S2011-P-9 P79139 2 2011 March Trout Gulch Rd PM 2.74 Geotech complete, 30% design 2022 $336,000 $12,455 $0
Note: Projects that have funding for landscape maintenance only are not included in this list. $5,178,000 $286,274 $120,000
2016 Storm Projects
Anticipated Original
Sup. 2019/20 2020/21
CIP # Project # Project Name Status Year of Damage
District EAs Budget
Construction Estimate
S2016-P-1 P79175 5 2016 March East Zayante Rd PM 6.63 Bids open in April 2020 $200,000 $321,817 $70,000
S2016-P-2 P79176 2 2016 March Eureka Canyon Rd PM 4.28 Design and environmental 2023 $180,600 $1,000 $0
S2016-P-3 P79177 5 2016 March Glenwood Drive PM 0.90 Geotech complete, 30% design 2022 $532,000 $11,033 $75,000
S2016-P-4 P79178 5 2016 March Kings Creek Rd PM 2.28 Geotech complete, 30% design 2022 $258,700 $0 $0
S2016-P-5 P79179 5 2016 March Kings Creek Rd PM 0.96 Geotech complete, 30% design 2021 $1,070,000 $10,504 $60,000
S2016-P-6 P79181 5 2016 March Mt. Charlie Rd PM 2.47 95% design, utility relocation needed 2022 $792,000 $57,048 $80,000
S2016-P-7 P79173 5 2016 March China Grade PM 0.62 Completed Completed $61,200 $2,452 $0
S2016-P-8 P79174 4 2016 March Coward Rd at Address 275 2020 Construction Schedule 2020 $45,000 $0 $10,000
S2016-P-9 P79182 2 2016 March Rider Rd PM 0.80 95% design, permits needed 2021 $610,000 $36,651 $80,000
S2016-P-10 P79183 2 2016 March Rider Rd PM 0.07 95% design, permits needed 2021 $525,000 $34,865 $75,000
S2016-P-11 P79184 2 2016 March Trout Gulch Rd PM 2.53 60% design, right of way needed 2022 $220,000 $49,360 $60,000
S2016-P-12 P40695 5 2016 March Lompico Road .75 Design and environmental 2023 $340,000 $34,360 $0
S2016-P-13 P79185 2 2016 March Valencia School Rd PM 0.39 95% design, permits needed 2021 $290,000 $10,000 $50,000
S2016-P-14 P79186 5 2016 March W. Hilton Drive at Everest Street Completed Completed $453,800 $13,887 $4,000
S2016-P-15 P79187 1 2016 March Schulties Rd PM 1.14 30% design 2023 $130,000 $0 $25,000
S2016-P-16 P79188 1 2016 March Schulties Rd PM 1.29 Preliminary design 2024 $250,000 $0 $0
S2016-P-17 P79189 1 2016 March Vine Hill Rd PM 1.96 60% design, small project 2021 $78,000 $2,298 $50,000
S2016-P-18 P79191 5 2016 March Bear Creek Rd PM 2.14 Preliminary design 2023 $220,000 $5,000 $0
S2016-P-19 P79199 5 2016 Storm E. Zayante Road PM 5.01 95% design, permits needed 2021 $623,000 $25,411 $80,000
S2016-P-20 P76604 2 Cabrillo College Drive PM 0.5 Completed Completed $136,900 $745 $0
S2016-P-21 P76603 1 Glen Haven Road PM 0.81 Construction 2020 $700,000 $676,389 $0
S2016-P-22 P76605 1 Soquel San Jose PM 5.36 Completed Completed $528,408 $23,663 $0
S2016-P-23 P76606 5 Jamison Creek Road PM 1.61 In Design * 2023 $220,000 $59,040 $0
* Time Extension may be required Project Totals: $8,464,608 $1,375,523 $719,000
105
ro detagilbO
lanigirO
detapicitnA
12/0202
02/9102
sesnepxE
.puS
setoN
gnidneP
egamaD
fo
raeY
sutatS
sliateD tcejorP
emaN tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
ot
tcirtsiD
gnidnuF
etamitsE
noitcurtsnoC
WSM llatsni
,T'01 x W'51 x L'03
- tuopilS
robaL
tnuoccA ecroF
000,5$
212$
165,1$
377,11$
306,612$
2202
ngiseD
nI
73400WP 05.0 MP daoR llerroM
1
89767P
921-P-7102S
llaw
ni hcetoeg
,noitagilbo
gnitiawA
9553 sserddA daoR lliM repaP
000,02$
403,62$
700,62$
340,101$
165,894$
3202
ngiseD
nI
3x03x02
tuopilS
1
75767P
031-P-7102S
ssergorp
04010WP
ni E&SP
%56
,etelpmoc yevruS
elip reidlos
llatsni ,D'21 x L'57
- tuopilS
000,52$
997,05$
376,35$
656,625$
320,370,1$
2202
ngiseD
nI
95400WP
94.0 MP daoR ffotuC relliM
1
46567P
331-P-7102S
02/6
detapicitna
ssecorp
llaw
ni E&SP
%56
,etelpmoc yevruS
,91/01
detapicitna
ssecorp
000,52$
493,8$
061,13$
148,45$
891,924$
2202
ngiseD
nI
redluohs/daor
egde tuopils D '02
x L '04
83400WP
41.0 MP daoR ehcaB .tM
1
15767P
431-P-7102S
noisrev
fo
lavorppa gnitiaw tseuqer
hcetoeg
,etelpmoc yevruS
70.1 ,40.1 ,20.1 MP daoR sivraJ
000,02$
428,71$
623,67$
445,622$
272,252$
2202
ngiseD
nI
tuopilS
1
65567P
741-P-7102S
etelpmoc troper
92000WP
hcetoeg
,etelpmoc yevruS
000,01$
011,6$
132,23$
086,161$
0$
2202
ngiseD
nI
tuopilS
42000WP 46.0 MP daoR sivraJ
1
83567P
841-P-7102S
etelpmoc troper
lacinhcetoeg
,etelpmoc yevruS
elip reidlos
llatsni ,D'52 x L'05
- tuopilS
noisrev
WP
,etelpmoc gnillird
000,061$
584,902$
233,47$
579,837$
0$
2202
ngiseD
nI
58400WP
10.1 MP ywH zurC atnaS dlO
1
35767P
451-P-7102S
llaw
AMEF
ot tnes tseuqer
etelpmoc
ngised
%56
000,5$
550,9$
566,08$
503,293$
030,343$
2202
ngiseD
nI
llaw
elip reidlos llatsni
,tuopilS
88900WP 25.0 MP daoR ttocserP
1
95767P
751-P-7102S
ni E&SP
%56
,etelpmoc yevruS
0$
400,2$
897,034$
480,562$
284,501$
3202
ngiseD
nI
erutcurts
gniniater gnitsixe ot
egamaD
16600WP 41.1 MP daoR seitluhcS
1
43567P
851-P-7102S
02/11
detapicitna
ssecorp
eb ot
sdeen
egamad trevluC
0$
99$
963,3$
488,3$
614,54$
2202
ngiseD
nI
eruliaf
trevluC
82000WP 66.1 MP daoR sivraJ
1
85567P
661-P-7102S
dessessa
etelpmoc
E&SP
%56
000,05$
052,03$
418,99$
481,668$
794,079$
2202
ngiseD
nI
tuopilS
04300WP 50.2 MP daoR seitluhcS
1
37567P
171-P-7102S
hcraM
ni
desitrevda gnieB
000,002,1$
288,07$
037,542$
742,960,2$
808,851,2$
0202
ngiseD
nI
91 x 001
tuopilS
50700WP
72.2 MP daoR nevaH nelG
1
53767P
4-P-7102S
tnemevap
,llawbirc llatsni ,tuopils
L '22
lirpA
ni esitrevda
ot ydaeR
000,003$
247,54$
052,801$
239,114$
904,434$
0202
ngiseD
nI
48000WP 39.1 MP daoR xoC
2
35567P
321-P-7102S
metsys
eganiard ,ekid CA
,riaper
nehpetS
ot enilniaH ,evirD daehesooM
1BS
dna
AMEF yb gnidnuF
000,5$
981$
470,4$
310,55$
447,09$
4202
ngiseD
nI
keerC
sotpA yb denimrednu
daoR
2
94567P
421-P-7102S
62000WP
1BS
dna
AMEF yb gnidnuF
0$
457,4$
526,6$
969,08$
085,39$
4202
ngiseD
nI
riaper niardnwoD
26310WP 65.0 MP evirD ffilcaeS
2
60867P
521-P-7102S
spets
txen
,AMEF yb deineD
00.0
MP daoR aicnelaV @ daoR xoC
0$
0$
495,3$
0$
464,503$
deineD
ngiseD
nI
niardnwod
deliaf dna tuopils
L '02
2
87767P
721-P-7102S
DBT
13400WP
ni E&SP
%56
,etelpmoc yevruS
elip reidlos
llatsni ,D'02 x L'02
- tuopilS
000,51$
574,6$
111,02$
630,143$
236,733$
2202
ngiseD
nI
08010WP
28.2 MP evA ateirP amoL
2
64767P
821-P-7102S
02/6
detapicitna
ssecorp
llaw
,llaw gniggal
reip llatsni ,tuopils
L '45
hcraM
ni gnisitrevdA
000,057$
894,17$
645,921$
868,619$
785,056,1$
0202
ngiseD
nI
38200WP 30.2 MP daoR xoC
2
25567P
231-P-7102S
liar draug
,ekid CA ,riaper tnemevap
ni E&SP
%56
,etelpmoc yevruS
elip reidlos
llatsni ,D'51 x L'06
- tuopilS
000,51$
988,9$
095,83$
483,28$
645,996$
2202
ngiseD
nI
53400WP
33.3 MP yaW ateirP amoL
2
74767P
831-P-7102S
02/6
detapicitna
ssecorp
llaw
ni
seiduts
latnemnorivnE
dna
PSR gnitsixe fo tuopils
roniM
000,3$
261,7$
891,8$
299,34$
717,07$
2202
ngiseD
nI
68400WP 83.0 MP daoR rediR
2
20867P
341-P-7102S
ssecorp
niard
ezisrevo
sisylana
kroW fo epocS
,)WPD
sv
AMEF( etelpmoc
mrots
ot eud trevluc hcni-63
deliaF
0$
749,21$
884,41$
472,31$
000,091$
3202
ngiseD
nI
20110WP
41.2 MP daoR saerdnA naS
2
35867P
441-P-7102S
neewteb
secnereffid
tnacifingis
swolf
epocs s'ytnuoC
dna WOS AMEF
hcetoeg
,etelpmoc yevruS
000,02$
690,61$
293,73$
317,051$
271,425$
1202
ngiseD
nI
'51x05
- tuopilS
92500WP
58.1 MP daoR hcluG tuorT
2
41867P
541-P-7102S
ssecorp ni troper
hcetoeg
,etelpmoc yevruS
000,05$
185,1$
869,92$
998,332$
665,888$
11202
ngiseD
nI
trevluc
ssorc raen tuopilS
egraL
03500WP
09.1 MP daoR hcluG tuorT
2
50767P
641-P-7102S
ssecorp ni troper
elip reidlos
llatsni ,D'51 x L'52
-tuopilS
1BS
dna
AMEF yb gnidnuF
000,5$
775,8$
506,41$
575,93$
803,351$
4202
ngiseD
nI
36900WP 01.1 MP daoR kreM
2
84767P
251-P-7102S
llaw
1BS
dna
AMEF yb gnidnuF
0$
99$
473,7$
976,4$
740,97$
4202
ngiseD
nI
elohkniS40300WP
89.0 MP daoR yellaV tnasaelP
2
07567P
551-P-7102S
elip reidlos
llatsni ,D'01 x L'24
- tuopilS
etelpmoc yevruS
000,01$
580,13$
491,04$
430,323$
019,373$
2202
ngiseD
nI
60700WP 33.0 MP hcluG retroP
2
85767P
651-P-7102S
llaw
etelpmoc yevruS
000,5$
241$
496,31$
291,53$
248,85$
2202
ngiseD
nI
51x02
- tuopilS
16300WP 40.0 MP evirD atseiS
2
56767P
951-P-7102S
1BS
dna
AMEF yb gnidnuF
0$
215$
492,5$
110,31$
752,694$
4202
ngiseD
nI
keerc
ni tnemides ot eud
gnidoolF
06600WP
81. MP daoR yellaV gnirpS
2
40767P
061-P-7102S
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FEMA
106
ro detagilbO
lanigirO
detapicitnA
12/0202
02/9102
sesnepxE
.puS
setoN
gnidneP
egamaD
fo
raeY
sutatS
sliateD tcejorP
emaN tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
ot
tcirtsiD
gnidnuF
etamitsE
noitcurtsnoC
hcetoeg
,etelpmoc yevruS
000,02$
529,31$
162,53$
601,026$
285,175$
1202
ngiseD
nI
'02x'04 - tuopilS
88400WP
61.1 MP daoR
hcluG tuorT
2
21867P
161-P-7102S
ssecorp ni troper
hcetoeg
,ssecorp ni yevruS
000,02$
126,01$
110,9$
252,92$
489,234$
1202
ngiseD
nI
tuopils & niardnwod nekorB
40010WP
81.1 MP daoR
hcluG tuorT
2
31867P
261-P-7102S
ssecorp ni troper
53.0
MP daoR loohcS
aicnelaV
etelpmoc E&SP
%56
000,05$
194,44$
007,651$
626,140,1$
167,240,1$
1202
ngiseD
nI
eert nellaf htiw tuopilS
2
90767P
361-P-7102S
66900WP
ssecorp ni E&SP
%59
000,03$
942,83$
435,411$
925,245$
483,894$
1202
ngiseD
nI
tnemknabme redluohs tuopilS
71800WP
12.1 MP evirD
lardehtaC
2
03767P
461-P-7102S
ylraen
hcetoeg ,snalp
%03
redluohs/egde daor tuopils D '71 x L '05
000,51$
600,51$
353,22$
170,708$
573,557$
2202
ngiseD
nI
70700WP
51.0 MP daoR
doowdeR
2
16767P
961-P-7102S
etelpmoc
keerc ot txen tnemknabme
,snalp
%03 ,etelpmoc yevruS
kcolb etercnoc deliaf 04.0 ,tuopilS-83.0
04.0
& 83.0 MP daoR
doowdeR
000,01$
246,01$
269,62$
998,977$
874,888$
2202
ngiseD
nI
2
20767P
071-P-7102S
etelpmoc
ylraen hcetoeg
trevluc egral ot llaw
17900WP
ylrae
riaper ot swerC ytnuoC
000,05$
180,02$
051,5$
692,62$
694,531$
0202
ngiseD
nI
eert kao nellaf ta tuopils llamS
60410WP
63.2 MP daoR
hcluG tuorT
2
60767P
271-P-7102S
0202 remmus
reidlos htiw riaper ,tuopils D '52 x L'56
1BS
dna AMEF yb gnidnuF
000,03$
943,23$
292,44$
880,139$
315,377$
3202
ngiseD
nI
daor dna PSR & skcabeit /w llaw elip49200WP
43.0
MP yaW dnalhgiH
rewoL
2
14567P
471-P-7102S
riaper
,snalp
%03 ,etelpmoc yevruS
-13.0 ,yawdaoR gniltteS gnikcarC-92.0
330
,130
,92.0 MP daoR
doowdeR
000,01$
502,12$
963,74$
725,435,2$
061,665,2$
2202
ngiseD
nI
2
10767P
571-P-7102S
etelpmoc
ylraen hcetoeg
trevluc "21 deliaf-33.0 ,tuopils
80900WP
,snalp
%03 ,etelpmoc yevruS
llaw birc htiw riaper ,tuopils H '51 x L'53
000,02$
473,31$
827,02$
404,045$
406,494$
2202
ngiseD
nI
93300WP
32.0 MP daoR
doowdeR
2
24567P
671-P-7102S
etelpmoc
ylraen hcetoeg
riaper daor dna
PFR hcetoeg
,etelpmoc yevruS
)30.3
MP(
50.3 MP daoR
hcluG tuorT
000,04$
272,51$
426,21$
425,401$
731,175$
1202
ngiseD
nI
tuopilS
2
44567P
181-P-7102S
ssecorp
ni
56200WP
,llaw gniggal/reip llatsni ,tuopils L '06
02/01
detcepxe ngised
%56
000,04$
173,04$
408,95$
835,808$
926,856$
3202
ngiseD
nI
eganiard ,ekid CA ,riaper tnemevap
46200WP
00.3 MP daoR
notnawS
3
34567P
081-P-7102S
liar draug ,metsys
gnitiaw
,etelpmoc yevruS
trevluC
27.0 MP daoR
notnawS
000,05$
021,34$
796,373$
786,881$
000,028$
2202
ngiseD
nI
llawdaeh dna trevluc eruliaF
3
87567P
89-P-7102S
noitagilbo
05300WP
sisylana kroW fo epocS
80.0
&
,40.0 ,30.0 MP
daoR yeffaG
000,01$
512,2$
425,9$
859,78$
488,866$
2202
ngiseD
nI
tuopilS
4
68567P
631-P-7102S
)WPD
sv AMEF( etelpmoc
55900WP
eganiard
etelpmoc yevruS
snalP
%03 ,etelpmoc yduts
eud eruliaf trevluc ot eud elohknis egraL
000,52$
636,01$
921,75$
263,476$
590,926$
1202
ngiseD
nI
25400WP
58.1 MP daoR
yellaV neerG
4
83767P
561-P-7102S
troper
lacigoloib ,etelpmoc
gnidoolf ot
yawrednu
hcetoeg
,etelpmoc yevruS
elip reidlos llatsni ,D'51 x L'84 - tuopilS
noisrev
,81/21 dereviled troper
000,03$
257,11$
394,64$
201,78$
249,856$
1202
ngiseD
nI
28200WP
01.2 MP daoR
keerC naeB
5
05567P
621-P-7102S
llaw
dettimbus tseuqer
,llaw gniggal/reip llatsni ,tuopils L '51
etelpmoc yevruS
000,51$
522,61$
133,02$
784,735$
045,024$
2202
ngiseD
nI
eganiard ,ekid CA ,riaper tnemevap
76200WP
08.0 MP eunevA
kraP tseW
5
54567P
131-P-7102S
lortnoc noisore ,metsys ,llaw gniggal reip llatsni ,tuopils L '04
etelpmoc ngised
%09
000,004$
317,63$
395,53$
032,924$
731,894$
1202
ngiseD
nI
eganiard ,ekid CA ,riaper tnemevap13000WP
08.0
MP daoR hcluG
drabbuH
5
73567P
731-P-7102S
lortnoc noisore ,metsys
hcraM ni gnisitrevdA
000,52$
010,5$
196,28$
806,806$
213,006$
0202
ngiseD
nI
tuopilS
51800WP
10.0
MP daoR keerC
raeB
dlO
5
25867P
241-P-7102S
llatsnI - tuopils & niardnwod nekorB
1BS
dna AMEF yb dednuF
000,5$
990,2$
408,6$
715,6$
000,55$
2202
ngiseD
nI
dna llifkcab ,PSR ro steksab noibag
72000WP
56.1 MP daoR
keerC sgniK
5
49567P
941-P-7102S
DS EPDH llatsnier ,llaw elip reidlos llatsni ,tuopils L '81
etelpmoc
hcetoeg dna yevruS
000,02$
387,62$
474,05$
033,063$
857,523$
2202
ngiseD
nI
noisore ,riaper tnemevap ,liar draug
67500WP
30.3 MP daoR
keerC sgniK
5
95567P
051-P-7102S
lortnoc ,ekid CA ,llaw gniggal reip ,tuopils L '53
etelpmoc E&SP
%56
000,001$
508,73$
804,011$
680,654$
012,704$
1202
ngiseD
nI
,riaper tnemevap ,metsys eganiard
88200WP
46.0 MP daoR
nisaB elttiL
5
04567P
151-P-7102S
lortnoc noisore
rof lavorppa
deviecer yltneceR
000,5$
180,72$
431,24$
997,373$
607,224$
4202
ngiseD
nI
tuopilS
71100WP
tuopilS
34.0 MP
daoR nosleN
5
86567P
351-P-7102S
laeppa etelpmoc E&SP
%56
000,04$
662,71$
877,911$
545,109$
545,109$
1202
ngiseD
nI
tuopilS
43400WP
58.0 MP daoR
nisaB elttiL
5
59767P
761-P-7102S
,esitrevda
ot ydaer ylraeN
51421
sserddA eunevA
ozneroL
000,053$
068,44$
164,19$
352,533$
438,032$
0202
ngiseD
nI
riaper trevluc & tuopilS
5
79767P
371-P-7102S
stimrep no gnitiaw
29500WP
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FEMA
107
ro detagilbO
lanigirO
detapicitnA
12/0202
02/9102
sesnepxE
.puS
setoN
gnidneP
egamaD
fo
raeY
sutatS
sliateD tcejorP
emaN tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
ot
tcirtsiD
gnidnuF
etamitsE
noitcurtsnoC
deggolc ot eud tuohsaw daoR
detelpmoc
sriaper
yraropmeT
000,001$
799,42$
306,624$
841,794$
000,056$
2202
ngiseD
nI
44.0 MP daoR nosleN
5
64567P
6-P-7102S
gnidoolf/trevluc
elip
reidlos llatsni ,D'02 x L'07 - tuopilS
hcraM
ni gnisitrevdA
000,055$
171,44$
567,76$
035,559$
745,847$
0202
ngiseD
nI
34400WP
31.1 MP daoR raB owT
5
52767P
281-P-7102S
llaw
,etelpmoc
hcetoeg
dna
yevruS
,llaw
elip hctits llatsni ,tuopils L '001
,devorppa
tseuqer
noisrev
WP
000,02$
968,01$
384,85$
927,61$
542,266$
1202
ngiseD
nI
draug
,ekid& tnemevap CA ,niardrednu
48200WP
61.3 MP daoR keerC sgniK
5
06567P
381-P-7102S
egakcap
noitagilbo
rof
gnitiaw
lortnoc noisore ,liar
noitagilbo
gnitiawA
000,51$
904,12$
488,81$
473,955$
638,444$
ngiseD
nI
llaw
birc llatsni - D'51 x L'55 - tuopilS
64400WP
42.0 MP hcluG trahkcoL
5
69767P
481-P-7102S
,liar
draug ,llawbirc llatsni ,tuopils L '52
19500WP
83.2 MP daoR ocipmoL
1BS
dna
AMEF
yb
dednuF
000,52$
640,34$
736,411$
664,583$
474,613$
3202
ngiseD
nI
5
91767P
5-P-7102S
ekid CA
C50CSZS
ni hcetoeg
,noitagilbo
gnitiawA
000,52$
865,52$
335,471$
416,976$
033,185$
3202
erutuF
llaw
elip hctits llatsni - L '201 - tuopilS
63400WP
51.0 & 41.0 MP daoR llerroM
1
05767P
931-P-7102S
ssergorp
llaw
elip reidlos llatsnI - daor gnikcarC
DBT
spets
txeN
0$
972$
044,53$
0$
733,385$
deineD
deineD
82.0
MP keerC redluoB - daoR reviR
5
40867P
3-P-7102S
niard hcnerf /w llat '6 x L '051
htiw
dedrawa
gnieb
tcejorP
gnitsixe
ot tnecajda tuopils gnoL '03
000,073$
349,63$
831,76$
431,693$
117,263$
0202
noitcurtsnoC
98400WP
02.0 MP daoR hcnaR hsinapS
1
90867P
771-P-7102S
yaM
ylrae
gnitrats
noitcurtsnoc
llawbirc
elip
reidlos llatsni ,D'81 x L'55 - tuopilS
etelpmoc
ylraen
noitcurtsnoC
000,01$
833,334$
399,642$
425,955,1$
077,074,1$
0202
noitcurtsnoC
93400WP
80.1 MP daoR nostetS
1
17767P
871-P-7102S
llaw
elip
reidlos llatsni ,D'51 x L'85 - tuopilS
etelpmoc
ylraen
noitcurtsnoC
000,01$
985,454$
361,542$
0$
0$
0202
noitcurtsnoC
93400WP
02.1 MP daoR nostetS
1
11867P
971-P-7102S
llaw
htiw
dedrawa
gnieb
tcejorP
000,004$
690,04$
018,78$
335,448$
495,297$
0202
noitcurtsnoC
tuopils L '07
78400WP
73.0 MP daoR hcnaR hsinapS
1
01867P
681-P-7102S
yaM
ylrae
gnitrats
noitcurtsnoc
elip
reidlos ,D '8 x L '24 - daor gnikcarC
etelpmoc
ylraen
noitcurtsnoC
000,5$
031,484$
020,004$
784,043$
472,823$
0202
noitcurtsnoC
44400WP
24.0 MP daoR aiV atlA
5
57767P
221-P-7102S
llaw
,desitrevda
gnieb
tcejorP
000,059$
528,23$
707,411$
348,921,1$
743,169$
0202
gniddiB
71 x 002 x 001 tuopilS
76700WP
15.0 MP daoR seitluhcS
1
46767P
581-P-7102S
yaM
ni
nigeb
ot
noitcurtsnoc
elip
reidlos llatsni ,D'01 x L'03 - tuopilS
1BS
dna
AMEF
yb
dednuF
0$
332,11$
026,76$
949,412$
532,392$
detelpmoC
detelpmoC
03000WP 74.1 MP daoR sivraJ
1
75567P
101-P-7102S
llaw
llaftuO
niarD mrotS evirD weivkcoR
1BS
dna
AMEF
yb
dednuF
0$
0$
645,471$
227,12$
887,141$
detelpmoC
detelpmoC
llaftuo niard mrots ta elohkniS
1
30767P
301-P-7102S
71010WP
1BS
dna
AMEF
yb
dednuF
0$
731,1$
392,172$
480,282$
899,568$
detelpmoC
detelpmoC
llifkcab
htrae llatsni ,D'42 x L'09 - tuopilS
46900WP
14.2 MP daoR dnalykS
1
66767P
801-P-7102S
elip
reidlos llatsni ,D'51 x L'57 - tuopilS
1BS
dna
AMEF
yb
dednuF
0$
09$
441,271$
517,18$
753,731$
detelpmoC
detelpmoC
50110WP
94.2 MP daoR dnalykS
1
76767P
901-P-7102S
llaw
elip
reidlos llatsni ,D'01 x L'03 - tuopilS
1BS
dna
AMEF
yb
dednuF
0$
934,04$
382,24$
949,85$
395,823$
detelpmoC
detelpmoC
09500WP 51.0 MP daoR sivraJ
1
49767P
011-P-7102S
llaw
retemaid
egral ot eud detfilpu saw daoR
evirD atteraM @ evirD yawriaF
1BS
dna
AMEF
yb
dednuF
0$
0$
512,061$
819,21$
280,44$
detelpmoC
detelpmoC
1
81867P
111-P-7102S
eert sutpylacue nellaf
64900WP
dna noitavacxe erutcurts ,tuopilS CA ,liardraug ,trevluc "81 ,llifkcab
1BS
dna
AMEF
yb
dednuF
0$
0$
313,15$
462,84$
337,885$
detelpmoC
detelpmoC
98500WP
55.0 MP evirD notgnitnuH
2
34767P
701-P-7102S
dna
lortnoc noisore ,ekid ,tnemevap noitategever
,noitavacxe
,trevluc teser dna evomeR
1BS
dna
AMEF
yb
dednuF
0$
0$
278,8$
158,51$
963,942$
detelpmoC
detelpmoC
83900WP
02.0 MP daoR yellaV raeB
2
74867P
611-P-7102S
tlahpsa dna reyal esab ,llifkcab
54.2 MP daoR noogaL drazzuB
1BS
dna
AMEF
yb
dednuF
0$
421$
332,7$
548,71$
688,901$
detelpmoC
detelpmoC
noisore dna gnittur ereveS
2
67767P
911-P-7102S
61800WP
1BS
dna
AMEF
yb
dednuF
0$
0$
881,92$
133,11$
045,23$
detelpmoC
detelpmoC
tnemtuba egdirb ta elohkniS
75900WP
89.1 MP daoR yellaV neerG
4
93767P
501-P-7102S
egdirb ta denimrednu llawbirC
1BS
dna
AMEF
yb
dednuF
0$
0$
300,24$
630,51$
431,56$
detelpmoC
detelpmoC
87010WP
52.3 MP daoR yellaV neerG
4
04767P
601-P-7102S
tnemtuba
deliaf
htiw peed '4 x gnol '07 tuopilS
1BS
dna
AMEF
yb
dednuF
0$
337,05$
434,15$
167,75$
657,68$
detelpmoC
detelpmoC
78500WP
81.0 MP daoR mahkceP
4
64867P
511-P-7102S
trevluc
)05.0
MP( 25.0 MP daoR mahnaC
1BS
dna
AMEF
yb
dednuF
0$
651$
697,663$
606,09$
967,645$
detelpmoC
detelpmoC
daor fo egde no tuopilS
5
33567P
99-P-7102S
55500WP
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FEMA
108
ro detagilbO
lanigirO
detapicitnA
12/0202
02/9102
sesnepxE
.puS
setoN
gnidneP
egamaD
fo
raeY
sutatS
sliateD tcejorP
emaN
tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
ot
tcirtsiD
gnidnuF
etamitsE
noitcurtsnoC
tnemevap ,llawbirc llatsni ,tuopils L '53
1BS
dna
AMEF
yb
dednuF
0$
381$
438,571$
375,311$
640,144$
detelpmoC
detelpmoC
,metsys eganiard ,ekid CA ,riaper
61500WP
05.3 MP
daoR
eilrahC .tM
5
74567P
001-P-7102S
lortnoc noisore
tuopilS
53.0 MP
daoR
keerC evoL
1BS
dna
AMEF
yb
dednuF
0$
240,1$
447,342$
299,15$
193,633$
detelpmoC
detelpmoC
llaw birc etercnoc llatsni ,tuopilS
5
36567P
201-P-7102S
51500WP
1BS
dna
AMEF
yb
dednuF
0$
836,1$
552,23$
820,601$
078,993$
detelpmoC
detelpmoC
PSR htiw daor dliuber ,tuopilS
15900WP
41.1 MP
daoR
keerC evoL
5
02767P
401-P-7102S
,eruliaf daor dna tnemknabme redluohS
1BS
dna
AMEF
yb
dednuF
0$
043,1$
819,911$
153,862$
092,342$
detelpmoC
detelpmoC
12900WP
53.1
MP
edarG anihC
5
82867P
211-P-7102S
eruliaf trevluc dna noitavacxe erutcurts ,tuopilS CA ,noitcetorp epols kcor ,llifkcab
1BS
dna
AMEF
yb
dednuF
000,51$
109,5$
364,381$
240,322$
962,702$
detelpmoC
detelpmoC
58010WP
58.1
MP
daoR ocipmoL
5
63867P
311-P-7102S
dna lortnoc noisore ,tnemevap noitategever llatsni ,daor deyortsed retaw ecafrusbuS
1BS
dna
AMEF
yb
dednuF
0$
74$
024,721$
258,25$
370,58$
detelpmoC
detelpmoC
debdaor wen dna trevluc ,niard hcnerf
74900WP
23.0
MP
enaL yromeM
5
73867P
411-P-7102S
noitces ,llifkcab dna noitavacxe ,riaper trevluC epols kcor ,trevluc EPDH "63 ,gnirohs
dednuF
1BS
- AMEF
yb
deineD
0$
0$
255,961$
0$
840,441$
detelpmoC
detelpmoC
98010WP
36.0
MP
daoR nosleN
5
00867P
711-P-7102S
noisore ,tnemevap CA ,noitcetorp noitategever dna lortnoc reidlos htiw riaper ,tuopils D '21 x L '04
1BS
dna
AMEF
yb
dednuF
0$
015$
465,203$
134,233$
812,074$
detelpmoC
detelpmoC
67000WP
94.0 MP
evirD
egdiR eulB
5
23567P
811-P-7102S
riaper tnemevap .C.A dna llaw elip ot eud eruliaf edargbus/tnemevaP
ozneroL
ot 9 YWH
- teertS evorG
1BS
dna
AMEF
yb
dednuF
0$
103,941$
160,371$
183,87$
496,301$
detelpmoC
detelpmoC
5
55567P
021-P-7102S
retaw ecafrusbus evissecxe dna gnidoolf
78200WP
eunevA
1BS
dna
AMEF
yb
dednuF
0$
090,961$
207,761$
027,96$
977,951$
detelpmoC
detelpmoC
gnidoolf ot eud eruliaf debdaoR
29200WP
9 ywH
O/E
tS niatnuoM
5
89567P
121-P-7102S
x L'54 ecalper/evomer ,gnilttes daoR
1BS
dna
AMEF
yb
dednuF
0$
371,76$
566,87$
191,51$
591,481$
detelpmoC
detelpmoC
81800WP
53.1 MP
daoR
eilrahC .tM
5
99767P
531-P-7102S
D'5 x W'01 eud degamad tnemknabme dna trevluC
1BS
dna
AMEF
yb
dednuF
0$
995,511$
278,701$
190,32$
522,23$
detelpmoC
detelpmoC
03010WP
45.0 MP
daoR
eilrahC .tM
5
12767P
041-P-7102S
gnidoolf ot ,ssergorp ni tuopils/gnikcarc daor L '04
1BS
dna
AMEF
yb
dednuF
0$
980,901$
298,511$
412,01$
593,024$
detelpmoC
detelpmoC
CA ,liar draug ,llaw gniggal/reip llatsni
02800WP
98.1 MP
daoR
eilrahC .tM
5
22767P
141-P-7102S
ekid
1BS
dna
AMEF
yb
gnidnuF
000,01$
507,496$
084,559$
558,870,1$
417,978$
detelpmoC
detelpmoC
tnemknabme redluohs tuopilS
7960WP
62.0 MP
daoR
eilrahC .tM
5
25767P
861-P-7102S
1BS
yb
dednuF
0$
895,64$
042,516,5$
285,310,5$
042,516,5$
detelpmoC
detelpmoC
lavomer sirbed mrotS
A
TAC-lavomeR
sirbeD suoiraV
llA
10567P
1-P-7102S
1BS
yb
dednuF
0$
349,4$
630,524,4$
793,152,1$
630,524,4$
detelpmoC
detelpmoC
serusaem evitcetorp mrotS
serusaeM
evitcetorP
mrotS suoiraV
llA
20567P
2-P-7102S
000,316,6$
846,823,4$
087,537,91$
327,859,83$
429,701,45$
:slatoT
tcejorP
AMEF
.AMEF
htiw
gnidnep
llits
era snoitagilbo
taht setacidni
roloC
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FEMA
109
AWHF
lanigirO
detapicitnA
12/0202
02/9102
ot
sesnepxE
snoitagilbO
.puS
setoN
egamaD
fo
raeY
sutatS
sliateD tcejorP
emaN
tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
1BS
&
tcirtsiD
etamitsE
noitcurtsnoC
gnidnuF
%59
,etelpmoc
latnemnorivnE
noitisiuqca
W/R
,etelpmoc
E&SP
000,52$
661,44$
515,99$
634,57$
064,072$
1202
*ngiseD
nI
D '01 yb W '03 - tuopilS
31.2 MP
daoR
lleD
lezaH
2
58767P
58-P-7102S
ssergorp
ni
elip reidlos kcab-eit ,FL 05 tuopilS dna noitavacxe erutcurts ,llaw gniniater
deen
,etelpmoc
E&SP
%59
000,05$
940,45$
707,24$
000,86$
423,525$
1202
*
ngiseD
nI
,liardraug ,ekid ,tnemevap CA ,llifkcab
28.3 MP
hcluG
oedoR
.N
1
62567P
03-P-7102S
WR
dna
stimrep
lortnoc noisore ,noitcetorp epols kcor noitategever dna
deen
,etelpmoc
E&SP
%59
000,57$
280,32$
578,59$
504,19$
329,776$
1202
*
ngiseD
nI
llaw elip dnemmocer ,'02 x '04 tuopilS
13.4 MP
hcluG
oedoR
.N
1
56567P
13-P-7102S
WR
dna
stimrep
deen
,etelpmoc
E&SP
%59
000,57$
265,32$
872,59$
098,101$
108,356$
1202
*
ngiseD
nI
tuopilS
49.4 MP
hcluG
oedoR
.N
1
66567P
64-P-7102S
WR
dna
stimrep
erutcurts ,egamad trevluc dna tuopilS etercnoc ,llifkcab dna noitavacxe
,dedeen
FAD
desiveR
000,03$
486,12$
400,95$
257,801$
007,356$
2202
*
ngiseD
nI
CA ,liar draug ,trevluc ,llawdaeh
08.1
MP daoR
egdoL
doowdeR
1
55867P
26-P-7102S
riaper
gninimreted
dna lortnoc noisore ,ekid ,tnemevap noitategever
W/R
,etelpmoc
E&SP
%56
detaicossa dna trevluc '3 fo eruliaF
000,03$
394,14$
395,23$
491,47$
000,005$
3202
*
ngiseD
nI
hcnaR
hsinapS
ta
yaW
dnalhgiH
1
42567P
07-P-7102S
dedeen
stimrep
dna
noitisiuqca
tuopils
%59
,etelpmoc
latnemnorivnE
000,51$
774,11$
379,31$
005,511$
000,053$
4202
*
ngiseD
nI
llaw dnemmocer ,T '02 x W '51 tuopilS
01.2
MP daoR
keerC
etinarG
1
88567P
28-P-7102S
etelpmoc
E&SP
etelpmoc
yevruS
000,3$
000,1$
748,5$
167,11$
212,38$
4202
*
ngiseD
nI
niard edisrevo htiw 5 x 01 x 05 tuopilS
74.0
MP daoR
keerC
etinarG
1
63767P
38-P-7102S
,trevluc yb T '01 x L '04 & '01 stuopils
2
etelpmoc
yevruS
0$
0$
725,4$
152,32$
000,002$
4202
*
ngiseD
nI
66.1
MP daoR
keerC
etinarG
1
41767P
49-P-7102S
psr dnemmocer
gniriuqca
,etelpmoc
E&SP
%59
0$
639,911$
217,162$
159,271$
561,396$
1202
*
ngiseD
nI
'51 x '06 - tuopilS
43.0
MP
daoR
aicnelaV
2
51867P
53-P-7102S
WR
ni
noitisiuqca
W/R
E&SP
%56
000,57$
981,45$
698,251$
865,571$
252,597$
1202
*
ngiseD
nI
etis egamad suoiverp fo eruliaf ,tuopilS
80.2 MP
daoR
lleD
lezaH
2
72567P
04-P-7102S
ssecorp
%59
,etelpmoc
latnemnorivnE
ssorc elbissop ,L '58 yawdaor gniltteS
000,001$
984,94$
617,901$
172,433$
880,030,1$
1202
*
ngiseD
nI
61.2 MP
daoR
lleD
lezaH
2
19567P
85-P-7102S
WR
gniriuqca
,etelpmoc
E&SP
egamad trevluc
E&SP
%03
000,5$
932,81$
070,91$
418,63$
758,721$
2202
*
ngiseD
nI
gnidnats llits ,llif tsol llaW birC
41.2
MP daoR
yellaV
snworB
2
02867P
66-P-7102S
%59
,etelpmoc
latnemnorivnE
000,001$
894,34$
951,401$
939,001$
827,004$
1202
*
ngiseD
nI
llat '21 x L '05 - llaw birc gniliaF
12.2 MP
daoR
lleD
lezaH
2
29567P
86-P-7102S
WR
gniriuqca
,etelpmoc
E&SP
%59
,etelpmoc
latnemnorivnE
000,001$
935,24$
592,742$
647,232$
007,191,1$
1202
*
ngiseD
nI
llaw birc deliaF
85.2 MP
daoR
lleD
lezaH
2
39567P
96-P-7102S
WR
gniriuqca
,etelpmoc
E&SP
%59
,etelpmoc
latnemnorivnE
pils ,D '01 x L '58 edilsdnal /tuopilS egraL
noitisiuqca
W/R
,etelpmoc
E&SP
000,001$
452,34$
566,411$
499,901$
926,056$
1202
*
ngiseD
nI
00.2 MP
daoR
lleD
lezaH
2
09567P
48-P-7102S
elip hctits ,laitnetop
ssergorp
ni
%59
,etelpmoc
latnemnorivnE
noitisiuqca
W/R
,etelpmoc
E&SP
000,52$
502,34$
130,901$
368,461$
784,279$
1202
*
ngiseD
nI
tnemelttes tnemknabme tuopilS
73.2 MP
daoR
lleD
lezaH
2
68767P
68-P-7102S
ssergorp
ni
,llaw gniggal dna reip llatsni ,tuopils L '21
WR
deen
,etelpmoc
E&SP
%59
000,01$
195,71$
039,03$
903,24$
000,172$
3202
*
ngiseD
nI
noisore ,riaper tnemevap ,ekid CA
60.4
MP
daoR
edarG
htimS
3
77567P
46-P-7102S
stimrep
dna
lortnoc
%59
,etelpmoc
latnemnorivnE
stimrep
dna
WR
,etelpmoc
E&SP
000,5$
846,81$
164,73$
189,42$
000,431$
2202
*
ngiseD
nI
.AID TF 3 x FL 05 - eruliaf trevluc
34.0
MP
daoR
nesluaP
4
54867P
16-P-7102S
dedeen
etelpmoc
latnemnorivnE
000,3$
042,1$
492,5$
992,41$
210,733$
2202
*
ngiseD
nI
FL 03 x retemaiD '6 - trevluC deliaF
69.0
MP daoR
annodaM
.tM
4
62867P
67-P-7102S
stimrep
,etelpmoc
snalp
%56
000,52$
0$
581,66$
723,48$
000,825$
2202
*
ngiseD
nI
llawbirc htiw riaper ,tuopils W '62
21.2 MP
daoR
keerC
raeB
5
01767P
63-P-7102S
dedeen
WR
,etelpmoc
%56
snalP
000,01$
361,8$
173,43$
859,94$
000,08$
3202
*
ngiseD
nI
tuopils ronim htiw trevluc ssorc deliaF
95.0
MP
etnayaZ
tsaE
5
48567P
83-P-7102S
ssergorp
ni noitisiuqca
,deweiver
neeb
evah
snalp
%56
,llifkcab dna noitavacxe erutcurts ,tuopilS
WR ,no
dekrow
gnieb
snalp
%59
000,52$
065,6$
565,03$
111,72$
845,38$
3202
*
ngiseD
nI
lanimret liardraug ,noitcetorp epols kcor
08.0
MP
daoR
ocipmoL
5
43867P
44-P-7102S
dedeen
stimrep
dna
noitategever dna lortnoc noisore ,metsys
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FHWA
110
AWHF
lanigirO
detapicitnA
12/0202
02/9102
ot
sesnepxE
snoitagilbO
.puS
setoN
egamaD
fo
raeY
sutatS
sliateD tcejorP
emaN
tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
1BS
&
tcirtsiD
etamitsE
noitcurtsnoC
gnidnuF
,llifkcab dna
noitavacxe erutcurts ,tuopilS
,deweiver
neeb
evah
snalp %56
,liardraug ,noitcetorp
epols kcor ,llaw birc
WR ,no
dekrow
gnieb
snalp %59
000,52$
743,8$
391,55$
426,65$
502,814$
3202
* ngiseD
nI
22.1 MP daoR
ocipmoL
5
53867P
54-P-7102S
dna lortnoc
noisore ,ekid ,tnemevap CA
dedeen
stimrep dna
noitategever
%59
,etelpmoc
latnemnorivnE
gnieb
W/R
,etelpmoc
E&SP
000,056$
231,36$
569,631$
745,641$
000,074$
1202
* ngiseD
nI
skcarc egral
htiw tnemelttes yawdaoR
37.0 MP
daoR
ablA
5
71567P
84-P-7102S
deriuqca
%56
,etelpmoc
latnemnorivnE
wen
,llawbirc llatsni ,tuopils L '53
dna
WR
deen
,etelpmoc
E&SP
000,04$
287,24$
286,26$
443,07$
438,363$
1202
* ngiseD
nI
20.0 MP ffotuC
doownelG
5
45567P
75-P-7102S
lortnoc
noisore ,ekid CA ,tnemevap
stimrep
%03
,etelpmoc
latnemnorivnE
000,5$
577,2$
128,5$
576,31$
606,55$
2202
* ngiseD
nI
llaw elip
gnitsixe woleb eruliaf epolS
20.2 MP evirD
doownelG
5
28767P
08-P-7102S
etelpmoc
E&SP
E&SP
,etelpmoc
latnemnorivnE
,gnikcarc
daor ,gninael llaw etercnoC
000,03$
986,64$
730,77$
739,471$
000,061,1$
4202
* ngiseD
nI
06.2 MP evirD
doownelG
5
38767P
18-P-7102S
etelpmoc
llaw birc llatsni
gniriuqca
,etelpmoc
snalp %59
000,001$
684,05$
760,641$
065,595$
979,516$
1202
ngiseD
nI
'51x'06 - tuopilS
22.2 MP evirD
etroficnarB
1
15567P
91-P-7102S
stimrep
elip reidlos
llatsni ,D'8 x L'501 - tuopilS
etelpmoc
E&SP %56
000,3$
895,9$
796,26$
932,773$
000,914$
ngiseD
nI
63.1 MP edarG
maerC
ecI
3
39767P
24-P-7102S
llaw
yranimilerp
,delipmoc
gnieb SEP
eno sedulcni
daor woleb edils egraL
lanif
,etelpmoc
troper
hcetoeg
0$
013,02$
867,255$
870,402$
002,673,1$
2202
ngiseD
nI
19.5 MP esoJ
naS
leuqoS
1
42767P
71-P-7102S
enal levart elcihev
weiver
rednu
tpecnoc
ngised
/edilsdnal
sah aera - tuopils gnoL
hcraM
fo
dne
gnisitrevdA
000,005,1$
423,14$
564,181$
555,896,1$
000,007$
0202
ngiseD
nI
20.2
MP daoR egdoL
doowdeR
1
27567P
22-P-7102S
seussi tnemelttes
erutcurts
,llaw elip reidlos ,tuopilS
CA ,niard
"21 ,llifkcab dna noitavacxe
yaM
ni
gnisitrevdA
000,005$
658,31$
326,511$
928,245$
473,325$
0202
ngiseD
nI
epols
kcor ,liardraug ,tnemevap
79.3 MP esoJ
naS
leuqoS
1
86767P
33-P-7102S
dna
lortnoc noisore ,noitcetorp noitategever
yaM
ni
gnisitrevdA
000,573$
341,24$
625,63$
228,453$
061,723$
0202
ngiseD
nI
5 x 03 x 8 tuopilS
76.5 MP esoJ
naS
leuqoS
1
96767P
43-P-7102S
yaM
ni
gnisitrevdA
000,006$
396,64$
431,351$
877,086$
101,586$
0202
ngiseD
nI
'5 x '08 x '05 tuopilS
72.1 MP daoR
lliH
eniV
1
47767P
74-P-7102S
dna noitavacxe
erutcurts ,L'05 ,tuopilS
gniriuqca
,etelpmoc
E&SP %59
epols
kcor ,niard ,llawbirc ,llifkcab
000,053$
375,42$
117,88$
798,244$
000,033$
1202
ngiseD
nI
29.0 MP evirD
etroficnarB
1
84867P
94-P-7102S
stimrep
dna lortnoc
noisore ,ekid ,CA ,noitcetorp noitategever
htiw riaper
,tuopils D '01 x W '06 x L '05
%59
,etelpmoc
latnemnorivnE
0$
705,43$
577,37$
568,384$
000,352$
1202
ngiseD
nI
edisrevo
dna ekid .C.A ,llif dereenigne
77.1 MP evirD
etroficnarB
1
90567P
05-P-7102S
etelpmoc
E&SP
niard
%59
,etelpmoc
latnemnorivnE
000,07$
407,81$
418,18$
219,353$
673,824$
1202
ngiseD
nI
llawbirc
gnitsixe ot tnecajda tuopilS
79.1 MP
daoR
leruaL
1
26567P
06-P-7102S
etelpmoc
E&SP
hcraM
ni
gnisitrevdA
000,005$
641,05$
420,601$
052,575$
811,938$
0202
ngiseD
nI
01 x 051 x 05 tuopilS
05.1
MP daoR egdoL
doowdeR
1
06767P
36-P-7102S
%59
,etelpmoc
latnemnorivnE
000,01$
821,03$
974,211$
535,575$
472,346$
1202
ngiseD
nI
3 x 52 tuopilS
79.1 MP daoR
nelG
leruaL
1
44767P
57-P-7102S
etelpmoc
E&SP
elip hctits
gnitsixe fo ecaf gnola tuopilS
hcraM
ni
gnisitrevdA
000,05$
983,42$
076,24$
574,49$
000,002$
0202
ngiseD
nI
56.1
MP daoR egdoL
doowdeR
1
17567P
78-P-7102S
llaw
,llifkcab dna
noitavacxe erutcurts ,tuopilS
,ekid ,tnemevap
CA ,llaw elip reidlos
yaM
ni
desitrevda
gnieB
000,057$
021,27$
524,141$
890,387$
007,635$
0202
ngiseD
nI
81.1 MP daoR
lliH
eniV
1
70567P
69-P-7102S
noisore ,noitcetorp
epols kcor ,liardraug noitategever dna lortnoc
ni
esitrevda
,stimrep
lanif gnitteG
riaper llaw
lian lios dnemmocer ,tuopilS
000,000,3$
406,051$
215,134$
804,671,3$
057,615,1$
0202
ngiseD
nI
34.2 MP daoR
aicnelaV
2
72767P
81-P-7102S
lirpA
PSR /w
stimrep
,etelpmoc
E&SP %56
laitnetop fo
sngis htiw )'03( tuopils rojaM
000,001$
299,66$
689,831$
856,507$
000,235$
1202
ngiseD
nI
63.3 MP noynaC
akeruE
2
02567P
93-P-7102S
dedeen
'07 lanoitidda
rof edilsdnal detaes peed
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FHWA
111
AWHF
lanigirO
detapicitnA
12/0202
02/9102
ot
sesnepxE
snoitagilbO
.puS
setoN
egamaD
fo
raeY
sutatS
sliateD tcejorP
emaN tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
1BS
&
tcirtsiD
etamitsE
noitcurtsnoC
gnidnuF
%59
,etelpmoc
latnemnorivnE
000,51$
010,42$
585,13$
288,23$
285,032$
1202
ngiseD
nI
tuopilS
76.4 MP noynaC
akeruE
2
97767P
15-P-7102S
etelpmoc
E&SP
%59
,etelpmoc
latnemnorivnE
000,03$
924,02$
275,13$
788,012$
481,882$
1202
ngiseD
nI
'21 x '52 - tuopilS
50.5 MP noynaC
akeruE
2
31767P
25-P-7102S
dedeen
stimrep
,etelpmoc
E&SP
%59
,etelpmoc
latnemnorivnE
tnecajda
redluohs tnemknabme tuopilS
000,03$
916,21$
358,14$
481,74$
495,905$
1202
ngiseD
nI
33.5 MP noynaC
akeruE
2
23767P
35-P-7102S
dedeen
stimrep
,etelpmoc
E&SP
keerc ot
%59
,etelpmoc
latnemnorivnE
000,5$
716,34$
646,39$
162,583$
593,828$
3202
ngiseD
nI
'02 x '05 - tuopilS
93.8 MP noynaC
akeruE
2
08767P
45-P-7102S
etelpmoc
E&SP
deen
,etelpmoc
E&SP
%59
detaicossa dna trevluc '3 fo eruliaF
000,001$
374,73$
424,57$
414,863$
050,984$
1202
ngiseD
nI
61.3 MP noynaC
akeruE
2
91567P
76-P-7102S
stimrep
tuopils
elip
reidlos llatsni ,D'01 x L'52 - tuopilS
dedeen
stimrep
,E&SP
%03
000,51$
684,21$
651,41$
410,18$
000,211$
2202
ngiseD
nI
39.2 MP daoR yellaV
snworB
2
08567P
77-P-7102S
llaw
%59
,etelpmoc
latnemnorivnE
fo tuopils D '03 x L '54
000,01$
188,72$
965,95$
466,773$
664,042,1$
2202
ngiseD
nI
42.1 MP
saerdnA
naS
2
26767P
88-P-7102S
etelpmoc
E&SP
tnemknabme/redluohs
%59
,etelpmoc
latnemnorivnE
trevluc
etagitsevni( trevluc revo tuopilS
000,01$
240,21$
432,13$
945,79$
539,001$
2202
ngiseD
nI
03.1 MP daoR
saerdnA
naS
2
36767P
98-P-7102S
etelpmoc
E&SP
)rehtruf
dettimbus
snalp
%56
000,2$
219,2$
655,21$
831,15$
074,69$
3202
ngiseD
nI
elohknis retemaid '3
09.1 MP daoR
edarG
htimS
3
47567P
32-P-7102S
1BS
dna AWHF
yb
gnidnuF
000,03$
097,9$
779,71$
496,54$
002,401$
2202
ngiseD
nI
trevluc ssorc deliaF
38.2 MP daoR
edarG
htimS
3
57567P
42-P-7102S
etelpmoc
snalp
%56
000,5$
256,72$
177,65$
535,905$
000,245$
3202
ngiseD
nI
ssergorp ni tuopils/gnikcarc daoR
06.1 MP edarG
maerC
ecI
3
51767P
62-P-7102S
llifkcab
htrae dna yrruls ,pmuls daoR
dettimbus
snalp
%56
0$
605,11$
456,21$
955,64$
000,83$
3202
ngiseD
nI
83.1 MP daoR
edarG
htimS
3
41567P
23-P-7102S
riaper
%59
,etelpmoc
latnemnorivnE
tnemevap
,llaw ESM llatsni ,tuopils L '24
0$
686,43$
185,46$
759,883$
046,243$
3202
ngiseD
nI
55.1 MP edarG
maerC
ecI
3
01567P
47-P-7102S
etelpmoc
E&SP
lortnoc noisore ,riaper
%59
,etelpmoc
latnemnorivnE
000,3$
214,4$
567,45$
371,412$
199,223$
3202
ngiseD
nI
tuopilS
25.0 MP daoR
edarG
htimS
3
70867P
09-P-7102S
etelpmoc
E&SP
%59
,etelpmoc
latnemnorivnE
000,5$
215,22$
813,97$
909,172$
000,654$
3202
ngiseD
nI
noitarapes
tnemevap tnemelttes/tuopilS
34.0 MP daoR
edarG
htimS
3
67567P
19-P-7102S
etelpmoc
E&SP
%59
,etelpmoc
latnemnorivnE
elip
reidlos llatsni ,D'01 x L'08 - tuopilS
000,5$
853,25$
137,77$
088,356$
508,957$
2202
ngiseD
nI
39.2 MP daoR
ylressaC
4
77767P
29-P-7102S
dedeen
stimrep
,etelpmoc
E&SP
llaw
%59
,etelpmoc
latnemnorivnE
000,51$
509,81$
580,02$
253,501$
862,031$
2202
ngiseD
nI
D '51 x W '02 - tuopilS
93.3 MP daoR
ylressaC
4
22867P
39-P-7102S
dedeen
stimrep
,etelpmoc
E&SP
noitcurtsnoc
rof
gnitiaW
000,059$
409,05$
067,941$
772,651$
000,524$
0202
ngiseD
nI
tuopils peed '06 x '57
85.1 MP
daoR
ablA
5
81567P
52-P-7102S
noitacoler
ytilitu
,noitazirohtua
,llifkcab
dna noitavacxe erutcurts ,tuopilS
%59
,etelpmoc
latnemnorivnE
,ekid
,tnemevap CA ,llaw elip reidlos
000,03$
586,63$
605,811$
581,286$
498,044$
2202
ngiseD
nI
4.1 MP daoR eripmE
notleF
5
13867P
55-P-7102S
etelpmoc
E&SP
dna lortnoc noisore ,liardraug noitategever
,liar
draug ,llawbirc llatsni ,tuopils L '04
%59
,etelpmoc
latnemnorivnE
000,51$
247,22$
637,111$
535,455$
566,533$
2202
ngiseD
nI
noisore ,riaper tnemevap ,ekid CA
26.1 MP daoR eripmE
notleF
5
61567P
65-P-7102S
etelpmoc
E&SP
lortnoc
%59
,etelpmoc
latnemnorivnE
000,5$
629,83$
070,49$
366,545$
048,273$
3202
ngiseD
nI
llaw
elip reidlos ,D '01 X L '54 - tuopils
86.1
MP daoR etnayaZ
tsaE reppU
5
51567P
56-P-7102S
etelpmoc
E&SP
%59
,etelpmoc
latnemnorivnE
elip
reidlos T '01 x L '77 llatsni ,tuopilS
000,02$
313,04$
864,901$
377,554$
000,754$
2202
ngiseD
nI
26.2 MP daoR eripmE
notleF
5
18767P
97-P-7102S
etelpmoc
E&SP
llaw
,redluohs
draobni degamad punur evaW
1BS
dna AWHF
yb
gnidnuF
0$
0$
697,6$
769,44$
000,051$
4202
*
erutuF
noogaL
narocroC ta evirD
ffilC
tsaE
1
38567P
87-P-7102S
riaper PSR
a degamad
tuopils tnemknabme daoR
denepo
sdiB
000,001,1$
729,77$
119,641$
926,391,1$
000,138$
0202
noitcurtsnoC
gniniater
elip reidlos ,daor eht fo noitrop
29.0 MP hcluG
oedoR
.N
1
21567P
92-P-7102S
llaw
ht42
hcraM
dedrawa
gnieB
000,005$
296,15$
204,431$
303,195$
501,259$
0202
noitcurtsnoC
tuopils L '07
54.5 MP yaW
dnalhgiH
1
78767P
14-P-7102S
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FHWA
112
AWHF
lanigirO
detapicitnA
12/0202
02/9102
ot sesnepxE
snoitagilbO
.puS
setoN
egamaD
fo
raeY
sutatS
sliateD tcejorP
emaN
tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
1BS
&
tcirtsiD
etamitsE
noitcurtsnoC
gnidnuF
dna noitavacxe larutcurts ,L '002 edilS ,niard ,llaw elip reidlos leets ,llifkcab
ht42
hcraM
dedrawa
gnieB
000,005$
882,78$
855,472$
007,627$
383,534,2$
0202
noitcurtsnoC
91.3 MP yaW
dnalhgiH
1
32867P
79-P-7102S
noisore ,ekid ,tnemevap CA ,liar draug noitategever dna lortnoc edils ot eud niardnwod degamaD
ht42
hcraM
dedrawa
gnieB
000,041$
024,52$
720,02$
523,421$
211,101$
0202
noitcurtsnoC
42.3 MP yaW
dnalhgiH
1
71867P
17-P-7102S
lairetam
ht42
hcraM
dedrawa
gnieB
000,004$
067,43$
914,06$
453,583$
766,403$
0202
noitcurtsnoC
tnemknabme redluohs tuopils llamS
37.3 MP yaW
dnalhgiH
1
42867P
27-P-7102S
redluohs/daor fo egde tuopilS
ht42
hcraM
dedrawa
gnieB
000,054$
240,43$
539,46$
678,743$
588,293$
0202
noitcurtsnoC
19.3 MP yaW
dnalhgiH
1
14767P
37-P-7102S
D "51 x W '52 - tnemknabme W '51 - gnippotrevo ot eud tuopils roniM
hcraM
ni
dedrawa
gnieB
000,02$
750,58$
454,82$
440,59$
588,201$
0202
noitcurtsnoC
53.1 MP daoR
rogerGcM
2
79567P
59-P-7102S
T '52
x
1BS
dna
AWHF
yb
gnidnuF
000,5$
260,576$
980,827$
872,057$
000,008$
0202
noitcurtsnoC
llaw elip reidlos ,L '08 - tuopilS
22.0 MP daoR
ocipmoL
5
69567P
02-P-7102S
noitcurtsnoc
rof dedrawa
tcejorP
000,054$
998,971$
524,111$
760,996$
000,995$
0202
noitcurtsnoC
tuopilS
99.4 MP daoR
keerC
raeB
5
11767P
61-P-7102S
noitcurtsnoc
rof dedrawa
tcejorP
000,524$
907,28$
683,64$
966,394$
000,722$
0202
noitcurtsnoC
FL 52 - tuopilS
0.7 MP daoR
keerC
raeB
5
91867P
12-P-7102S
noitcurtsnoc
rof dedrawa
tcejorP
000,004$
867,131$
374,001$
123,336$
000,406$
0202
noitcurtsnoC
tnemknabme redluohs ,tuopilS
62.7 MP daoR
keerC
raeB
5
21767P
73-P-7102S
elip reidlos ,tuopils tnemknabme daoR
ht62
hcraM
gninepo
diB
000,057$
605,84$
800,141$
376,108$
000,126$
0202
gniddiB
07.0
MP daoR keerC
nosimaJ
5
31567P
72-P-7102S
riaper llaw
ht62
hcraM
gninepo
diB
000,054,1$
887,611$
739,651$
879,275,1$
000,497$
0202
gniddiB
llaw elip hctits llatsni ,tuopils L'051
44.1
MP daoR keerC
nosimaJ
5
81767P
82-P-7102S
ht62
hcraM
gninepo
diB
000,007$
747,101$
434,051$
634,197$
000,579$
0202
gniddiB
llaw elip reidlos llatsni ,D'8 x L'08 - tuopilS
08.0
MP daoR keerC
nosimaJ
5
61767P
34-P-7102S
elip reidlos llatsni ,D '8 x L '94 - tuopilS
ht62
hcraM
gninepo
diB
000,525$
096,08$
637,051$
344,206$
000,086$
0202
gniddiB
90.1
MP daoR keerC
nosimaJ
5
71767P
95-P-7102S
llaw eruliaf noitces larutcurts/edargbus daoR
1BS
dna
AWHF
yb
dednuF
0$
292,2$
377,352$
045,43$
184,352$
detelpmoC
detelpmoC
25.1 MP daoR
nelG leruaL
1
61867P
11-P-7102S
gnidoolf ot eud tcurtsnoc ,riaper redluohs dna yawdaoR dna noitavacxe erutcurts ,llaw ESM
1BS
dna
AWHF
yb
dednuF
0$
0$
492,300,1$
573,359$
420,230,1$
detelpmoC
detelpmoC
tsewdim ,ekid dna tnemevap CA ,llifkcab
teertS sotpA
ta leuqoS
2
32767P
21-P-7102S
dna lortnoc noisore ,metsys liardraug noitategever dna tnemknabme ,yawdaor fo riapeR yraropmet enal elgnis llatsnI .trevluc dna noitavacxe erutcurts ,gnirohs ,egdirb
1BS
dna
AWHF
yb
dednuF
0$
257,51$
380,842,7$
759,835,6$
020,242,7$
detelpmoC
detelpmoC
htiw trevluc etalp itlum ecalper ,llifkcab
hcluG tuorT
ta aicnelaV
2
13567P
31-P-7102S
yawdaor ,trevluc xob etercnoc decrofnier etagergga ,tnemevap CA ,noitavacxe .noitategever dna lortnoc noisore ,esab fo ssol gnisuac llef eert egral ,L 53 tuopilS ni pmuls gnitaerc dna ytilibats
1BS
dna
AWHF
yb
dednuF
0$
0$
599$
248,41$
059,601$
detelpmoC
detelpmoC
dna noitavacxe larutcurts - tnemknabme
17.7 MP noynaC
akeruE
2
43767P
51-P-7102S
noisore ,ekid ,tnemevap CA ,llifkcab noitategever dna lortnoc enal dnuobtsae fo ssol desuac gnidoolF
1BS
dna
AWHF
yb
dednuF
0$
947,61$
389,079$
156,319$
511,689$
detelpmoC
detelpmoC
trevluc ,enal erotser ,tnemknabme dna
20.8 MP daoR
keerC
raeB
5
82567P
7-P-7102S
tnemevap ,llaw elip reidlos/w ,trevluc EPDH ''81 ecalper ,tuopilS kcor ,esab etagergga ,CA ,sllawdaeh
1BS
htiw
dednuf
,deined
AWHF
0$
0$
900,752$
783,893$
900,752$
detelpmoC
detelpmoC
33.4 MP etnayaZ
tsaE
5
58567P
8-P-7102S
dna lortnoc noisore ,noitcetorp epols noitategever
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FHWA
113
AWHF
lanigirO
detapicitnA
12/0202
02/9102
ot sesnepxE
snoitagilbO
.puS
setoN
egamaD
fo
raeY
sutatS
sliateD
tcejorP
emaN
tcejorP
# tcejorP
#
PIC
tegduB
sAE
etaD
1BS
&
tcirtsiD
etamitsE
noitcurtsnoC
gnidnuF
1BS
dna
AWHF
yb
dednuF
0$
385,4$
968,579$
851,836$
582,579$
detelpmoC
detelpmoC
enal
eno
fo
tuopils
peed
'02
x
'85
26.2
MP
evirD
doownelG
5
92567P
9-P-7102S
1BS
dna
AWHF
yb
dednuF
000,2$
292,3$
743,43$
358,8$
009,56$
detelpmoC
detelpmoC
trevluc
'04x"42
deliaF
72.4
MP
evirD
doownelG
5
98567P
01-P-7102S
a
degamad
tuopils
tnemknabme
daoR
,trevluc
gnitsixe
dna
daor
eht
fo
noitrop
1BS
dna
AWHF
yb
dednuF
0$
419,12$
862,491,3$
957,697,2$
748,481,3$
detelpmoC
detelpmoC
02.0
daoR
keerC
raeB
5
11567P
41-P-7102S
na
edivorp
dna
trevluc
gnitsixe
ecalper
erutcurts
gniniater
ESM
000,166,81$
951,099,3$
176,591,22$
084,287,24$
012,009,65$
:slatoT
tcejorP
AWHF
etamitsE
egamaD
sutatS
noisnetxE
emiT
135,728,31$
)setis
03(
deriuqer
eb
yam
noisnetxE
emiT
*
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS STORM DAMAGE PROJECTS
2017 Storm Projects - FHWA
114
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS FINANCING SUMMARY
APTOS TRANSPORTATION IMPROVEMENT FUND - 72635
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $343,624 $43,624 $63,624 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $70,000 $70,000 $70,000 $70,000 $70,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $370,000 $50,000 $133,624 $70,000 $70,000
$52,736 $345,000 $345,000 $54,112 CARRY OVER $43,624 $63,624 $0 $0 .
CIP # DESCRIPTION
N/A Plan Line Aptos Planning $0 $20,000 $20,000
R-P-18 Aptos Village Circulation
$24,429 $0 $0
(Aptos Village Plan Improvements)
R-P-22 State Park Drive Improvements $29,683 $50,000 $30,000
$54,112 $70,000 $50,000
LIVE OAK TRANSPORTATION IMPROVEMENT FUND - 72625
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $377,374 $327,374 $287,374 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $60,000 $60,000 $60,000 $60,000 $60,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $110,000 $100,000 $347,374 $60,000 $60,000
$331,648 $54,000 $54,000 $8,274 CARRY OVER $327,374 $287,374 $0 $0 $0
CIP # DESCRIPTION
R-P-40 Howe Street/Winkle $0 $20,000 $10,000
N/A New Live Oak Road Planning $7,679 $40,000 $40,000
R-P-41 Soquel Avenue/Mattison $0 $10,000 $10,000
R-P-39 East Cliff 7th to 14th Avenue $595 $10,000 $10,000
R-P-42 East Cliff 17th Avenue to Palisades $0 $10,000 $10,000
N/A Portola Commercial Study $0 $5,000 $5,000
R-P-14 Soquel Drive to Soquel Avenue
$0 $5,000 $5,000
Dedicated Right Turn Lane
R-P-16 Capitola Road - 7th Avenue to 17th Avenue
$0 $5,000 $5,000
Widen
R-P-17 Capitola Road - Chanticleer to 30th Avenue
$0 $5,000 $5,000
Widen
$8,274 $110,000 $100,000
PAJARO VALLEY TRANSPORTATION IMPROVEMENT FUND - 72640
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $152,661 $157,661 $162,661 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $15,000 $15,000 $15,000 $15,000 $15,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $10,000 $10,000 $177,661 $15,000 $15,000
$156,769 $16,000 $16,000 $20,108 CARRY OVER $157,661 $162,661 $0 $0 $0
CIP # DESCRIPTION
R-P-26 Holohan / Highway 152 $11,664 $0 $0
N/A Road Planning / Preliminary Engineering $8,444 $10,000 $10,000
$20,108 $10,000 $10,000
SOQUEL TRANSPORTATION IMPROVEMENT FUND - 72630
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $21,258 $21,258 $26,258 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $25,000 $25,000 $25,000 $25,000 $25,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $25,000 $20,000 $51,258 $25,000 $25,000
$0 $26,000 $26,000 $4,742 CARRY OVER $21,258 $26,258 $0 $0 $0
CIP # DESCRIPTION
0 Road Planning / Preliminary Engineering $4,742 $15,000 $10,000
R-P-13 Soquel Drive to 41st Avenue
$0 $5,000 $5,000
Dedicated Right Turn
R-P-13 Robertson and Soquel Signal $0 $5,000 $5,000
$4,742 $25,000 $20,000
115
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS FINANCING SUMMARY
APTOS ROADSIDE IMPROVEMENT FUND - 72590
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $281,426 $281,426 $286,426 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $70,000 $70,000 $70,000 $70,000 $70,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $70,000 $65,000 $356,426 $70,000 $70,000
$3,110 $70,000 $300,000 $21,684 CARRY OVER $281,426 $286,426 $0 $0 $0
CIP # DESCRIPTION
R-P-18 Aptos Village Circulation
$12,599 $0 $0
(Aptos Village Plan Improvements)
R-P-44 Disability Access Preliminary Engineering $0 $20,000 $15,000
N/A Road Planning / Preliminary Engineering $1,002 $15,000 $15,000
R-P-22 State Park Drive Improvements $8,083 $35,000 $35,000
$21,684 $70,000 $65,000
CARBONERA ROADSIDE/ROADWAY IMPROVEMENT FUND - 72595
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $21,154 $18,154 $15,154 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $2,000 $2,000 $2,000 $2,000 $2,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $5,000 $5,000 $17,154 $2,000 $2,000
$19,154 $2,000 $2,000 $0 CARRY OVER $18,154 $15,154 $0 $0 $0
CIP # DESCRIPTION
N/A Road Planning / Preliminary Engineering $0 $5,000 $5,000
$0 $5,000 $5,000
LIVE OAK ROADSIDE IMPROVEMENT FUND - 72755
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $660,071 $635,071 $615,071 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $60,000 $60,000 $60,000 $60,000 $60,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $85,000 $80,000 $675,071 $60,000 $60,000
$616,037 $55,000 $55,000 $10,966 CARRY OVER $635,071 $615,071 $0 $0 $0
CIP # DESCRIPTION
R-P-46 Soquel Avenue - Mattison Lane to South
$0 $10,000 $10,000
Rodeo Gulch
R-P-44 Disability Access Preliminary Engineering $2,694 $10,000 $10,000
R-P-48 Howe Street / Winkle Avenue $0 $10,000 $10,000
N/A Road Planning / Preliminary Engineering $7,280 $20,000 $20,000
R-P-39 East Cliff 7th to 14th Avenue $992 $10,000 $10,000
R-P-42 East Cliff 17th Avenue to Palisades $0 $10,000 $5,000
R-P-14 Soquel Drive to Soquel Avenue - Dedicated
$0 $5,000 $5,000
Right Turn
R-P-16 Capitola Road - 7th Avenue to 17th Avenue
$0 $5,000 $5,000
Widen
R-P-17 Capitola Road - Chanticleer to 30th Avenue
$0 $5,000 $5,000
Widen
$10,966 $85,000 $80,000
PAJARO VALLEY ROADSIDE IMPROVEMENT FUND - 72600
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $29,465 $28,465 $33,465 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $5,000 $5,000 $5,000 $5,000 $5,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $6,000 $0 $38,465 $5,000 $5,000
$32,555 $5,000 $5,000 $8,090 CARRY OVER $28,465 $33,465 $0 $0 $0
CIP # DESCRIPTION
R-P-44 Disability Access Preliminary Engineering $0 $2,000 $2,000
N/A Road Planning / Preliminary Engineering $6,394 $4,000 $3,000
R-P-26 Holohan / Highway 152 $1,696 $0 $0
$8,090 $6,000 $5,000
116
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS FINANCING SUMMARY
SOQUEL ROADSIDE IMPROVEMENT FUND - 72605
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $26,666 $11,666 $1,666 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $30,000 $30,000 $30,000 $30,000 $30,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $45,000 $40,000 $31,666 $30,000 $30,000
$477 $29,000 $29,000 $2,811 CARRY OVER $11,666 $1,666 $0 $0 $0
CIP # DESCRIPTION
R-P-44 Disability Access Preliminary Engineering $0 $15,000 $15,000
N/A Road Planning / Preliminary Engineering $2,811 $20,000 $15,000
R-P-13 Soquel Drive to 41st Avenue
$0 $5,000 $5,000
Dedicated Right Turn
R-P-15 Robertson and Soquel Signalization $0 $5,000 $5,000
$2,811 $45,000 $40,000
TRANSPORTATION DEVELOPMENT ACT FUND (Bikeways) - 621220
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $363,875 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $175,000 $175,000 $175,000 $175,000 $175,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $538,875 $175,000 $175,000 $175,000 $175,000
$379,525 $175,200 $181,951 $197,601 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
R-P-50 Sanctuary Scenic Trail $595 $92,851 $0
R-P-22 State Park Drive Sidewalk / Bike Lanes $29 $233,406 $0
R-P-51 Wilder Ranch Coastal Bike Path Phase II $0 $37,618 $0
R-P-52 Bike Lane Maintenance District 1 $47,822 $47,822 $47,822
R-P-53 Bike Lane Maintenance District 2 $79,044 $53,567 $53,567
R-P-54 Bike Lane Maintenance District 3 $13,437 $16,937 $16,937
R-P-55 Bike Lane Maintenance District 4 $13,424 $13,424 $13,424
R-P-56 Bike Lane Maintenance District 5 $43,250 $43,250 $43,250
$197,601 $538,875 $175,000
CSA 9 HIGHWAY SAFETY AND LIGHTING FUND - 622115
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $123,937 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $1,128,463 $1,128,463 $1,128,463 $1,128,463 $1,128,463
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $1,252,400 $1,128,463 $1,128,463 $1,128,463 $1,128,463
$247,955 $1,100,939 $1,097,701 $1,221,720 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A Congestion Management Program $100,000 $100,000 $100,000
N/A Grant Writing $0 $5,000 $5,000
N/A Cross Walk Program $25,000 $25,000 $20,000
N/A Speed Survey Program $0 $25,000 $25,000
N/A Traffic Engineering $418,539 $450,000 $400,000
N/A Traffic Studies $595 $25,000 $25,000
N/A Signal Maintenance $190,775 $250,000 $246,063
N/A Traffic Count Program (ADTS) $0 $30,000 $30,000
N/A Underground Utilities $1,020 $5,000 $5,000
N/A Traffic Engineering Consultants $83,821 $50,000 $30,000
N/A Radar Maintenance $4,723 $10,000 $10,000
N/A Road Bump program $6,694 $15,000 $15,000
N/A Utilities $146,867 $200,000 $180,000
N/A Accounting and Audit Fees $1,200 $1,200 $1,200
N/A Outside the Box Art Program $11,200 $11,200 $11,200
R-P-15 Robertson and Soquel Signal $5,409 $50,000 $25,000
R-P-26 Holohan / Highway 152 Signal Upgrade $22,176 $0 $0
R-P-18 Aptos Village Traffic Signals $203,701 $0 $0
$1,221,720 $1,252,400 $1,128,463
117
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS FINANCING SUMMARY
CSA 9A RESIDENTIAL LIGHTING FUND - 622120
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $912,553 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $578,246 $578,246 $578,246 $578,246 $578,246
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $1,490,799 $578,246 $578,246 $578,246 $278,246
$1,629,675 $568,246 $339,452 $1,056,575 CARRY OVER $0 $0 $0 $0 $300,000
CIP # DESCRIPTION
N/A Engineering $250,162 $167,671 $167,671
N/A Utilities $293,358 $250,000 $250,000
N/A Tree Trimming $100,086 $50,000 $50,000
N/A Accounting and Audit Fees $0 $575 $575
N/A Light Upgrades $99,885 $100,000 $100,000
N/A Computers and Software $0 $10,000 $10,000
N/A Lighted Crosswalks $163,284 $0 $0
R-P-22 State Park Drive / Searidge - Seacliff Village $149,799 $0 $0
N/A Appropriations for Contingencies $0 $912,553 $0
$1,056,575 $1,490,799 $578,246
FLOOD CONTROL AND WATER CONSERVATION DISTRICT ZONE 7 - 622380
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $29,134 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $4,174,412 $4,174,412 $4,174,412 $4,174,412 $4,174,412
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $4,203,546 $4,174,412 $4,174,412 $4,174,412 $4,174,412
$1,177,895 $2,942,029 $2,768,088 $3,916,849 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A General Engineering and Public Service $185,000 $200,000 $200,000
N/A Permitting and Environmental Studies $23,000 $50,000 $50,000
N/A County Counsel Services $15,000 $15,000 $15,000
N/A Public Safety Cleanup $15,000 $15,000 $15,000
N/A Pajaro River Watershed Flood Prevention
$40,000 $25,000 $25,000
Authority
N/A M&O Zone 7 $500,000 $515,000 $515,000
N/A Permit and Monitoring Requirements $34,000 $0 $0
N/A Alert System M&O $61,893 $50,000 $50,000
N/A Storm Monitoring and EOC $0 $20,000 $20,000
F-P-1 DWR Frerp Round 3 X-Band $176 $22,500 $22,500
N/A Flood Control Project Advocacy $100,000 $100,000 $100,000
F-P-2 Army Corps Flood Control Projects $1,364,960 $998,000 $998,000
F-P-2 Contributions to US Army Corps of Engineers $1,000,000 $1,745,491 $1,745,491
F-P-4 Pajaro River Bench Excavation Project $300,000 $90,000 $90,000
N/A PR LRG Wood Debris Removal Reach 4 $1,563 $0 $0
N/A Salsi. Levee Rd Storm Damage Repair $1,081 $0 $0
N/A PR Sta. 435_00 Storm Damage Repair $4,049 $0 $0
N/A R3-0095 Coolidge Culvert $157,740 $0 $0
N/A R3-0096 Coolidge Geotech $7,386 $0 $0
N/A Stream Maintenance Plan Dev $100,000 $200,000 $200,000
N/A Pajaro Raptor Program $6,000 $5,000 $5,000
N/A Appropriations for Contingencies $0 $152,555 $123,421
$3,916,849 $4,203,546 $4,174,412
FLOOD CONTROL AND WATER CONSERVATION DISTRICT ZONE 7A - 622385
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $0 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $77,000 $77,000 $77,000 $77,000 $77,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $77,000 $77,000 $77,000 $77,000 $77,000
$534,538 $49,000 $112,000 $646,538 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A Administration and Public Services $27,000 $29,000 $29,000
N/A Capital Reserve Zone 7a Structures and
$619,538 $48,000 $48,000
Improvements
$646,538 $77,000 $77,000
118
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS FINANCING SUMMARY
FLOOD CONTROL & WATER CONSERVATION DISTRICT ZONE 5 EXP- 622365
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $313,623 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $293,500 $293,500 $293,500 $293,500 $293,500
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $607,123 $293,500 $293,500 $293,500 $293,500
$340,623 $233,800 $278,000 $305,000 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A Plan Review $50,000 $60,000 $60,000
N/A Engineering $85,000 $95,000 $95,000
N/A Permit Processing $100,000 $100,000 $100,000
N/A Minor Projects $70,000 $75,000 $38,500
N/A Capital Reserves $0 $277,123 $0
$305,000 $607,123 $293,500
FLOOD CONTROL AND WATER CONSERVATION DISTRICT ZONE 6 - 622375
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $301,256 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $78,000 $71,000 $71,000 $71,000 $71,000
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $379,256 $71,000 $71,000 $71,000 $71,000
$267,256 $112,000 $150,000 $116,000 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A Plan Review $20,000 $12,000 $12,000
N/A Permit Processing $5,000 $0 $0
N/A Engineering $8,000 $13,000 $13,000
N/A Water Quality NPDES $6,000 $13,000 $13,000
N/A M&O Zone 6 $1,000 $0 $0
N/A NPDES Inlet/Trap Cleaning $1,000 $1,000 $1,000
D-P-1 Esplanade Drainage Improvements $75,000 $340,256 $32,000
$116,000 $379,256 $71,000
FLOOD CONTROL AND WATER CONSERVATION DISTRICT ZONE 8 - 622360
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $211,653 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $53,400 $53,400 $53,400 $53,400 $53,400
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $265,053 $53,400 $53,400 $53,400 $53,400
$181,153 $61,200 $57,000 $26,500 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A Permit Processing $4,500 $0 $0
N/A Plan Review $3,500 $5,000 $5,000
N/A Engineering and Public Service $8,000 $17,000 $17,000
N/A M&O Zone 8 $4,500 $4,500 $4,500
N/A Water Quality NPDES $6,000 $13,000 $13,000
N/A Capital Reserve $0 $225,553 $13,900
$26,500 $265,053 $53,400
119
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
SECTION IV
2020/21 Capital Improvement Program
County of Santa Cruz
Parks, Open Space and Cultural Services
Programmed Projects
120
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-1 SUPERVISORIAL DISTRICT(S): Multiple
MASTER PROJECT NUMBER: 1 91162, 492300 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 50006, R50059 STRATEGIC PLAN: 4.B, 4.D, 6.C
2016 AN D 2017
STORM D ISASTERS
PROJECT TYPE: Park LOCATION: Multiple Sites
FUNDING STATUS: F ully Funded PLANNING AREA: M ultiple Areas
PROJECT STATUS: Design, Construction ESTIMATED COMPLETION DATE: 2 020/21
DESCRIPTION & BACKGROUND:
The final outstanding repair project from the 2016 and 2017 Storm Disasters is Soquel Lions Park. Staff is currently
awaiting approval of this project from the Federal Emergency Management Agency (FEMA) to secure 75% funding.
IMPACT TO OPERATIONS:
Park repairs are anticipated to restore use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,060,632 FEMA $ 5 35,740
CalOES $ 1 33,935
Preliminary $ - General Fund $ 1 29,521
Design $ -
Acquisition $ -
Construction $ 799,196 $ -
Other $ - Total Project Funding $ 7 99,196
Total Estimated Cost $ 799,196 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 320,326 $ 51,544 $ 2 ,512 $ 424,813 $ - $ - $ - $ - $ - $ 799,196
121
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-2 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94954 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P1101 STRATEGIC PLAN: 4.A, 6.C
ALDRIDGE L ANE PARK
PARK IMPRO VEMENTS
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: E ureka
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Tennis court resurfacing was completed in 2016/17, a new shade structure and exercise equipment were installed in
2018/19. The final phase of improvements will include the replacement of the play structure, pending funding.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 48,487 Eureka Park Dedication Fund $ 7 8,056
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 140,000 $ -
Other $ - Total Project Funding $ 78,056
Total Estimated Cost $ 140,000 Funding Not Yet Identified $ 6 1,944
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 2 2,392 $ 1 7,805 $ - $ 3 7,859 $ - $ - $ - $ - $ 61,944 $ 140,000
122
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-3 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 91162, 191998 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P1051 STRATEGIC PLAN: 4.A, 4.C, 5.B, 6.C
APTOS VILL AGE PARK
DEFERRED MA INTENANCE
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This necessary deferred maintenance and improvement project is in the concept phase. It includes building repairs,
kitchen remodel, windows and lighting upgrades, and ADA improvements, as well as additional park features and
improvements to be defined.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate TBD Deferred Maintenance Bond $ 8,893
Measure G Funds $ 435,000
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ - $ -
Other $ - Total Project Funding $ 443,893
Total Estimated Cost $ - Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 8,893 $ - $ - $ 435,000 $ - $ - $ - $ - $ - $ 443,893
123
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-4 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94954, 191152 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P0212 STRATEGIC PLAN: 6.C
BERT SCOT T ESTATE
DEFERRED MA INTENANCE
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: E ureka
PROJECT STATUS: Preliminary ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This necessary deferred maintenance project includes: public access improvements and roof replacement.
IMPACT TO OPERATIONS:
Site refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 565,000 Eureka Park Dedication Fund $ 93,433
Fund 40 Fund Balance $ 44,940
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 565,000 $ -
Other $ - Total Project Funding $ 138,373
Total Estimated Cost $ 565,000 Funding Not Yet Identified $ 426,627
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 138,373 $ - $ - $ - $ - $ 426,627 $ 565,000
124
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-5 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 94956, 191162, 134988 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P1052, RP1053, RP1054, RD0001 STRATEGIC PLAN: 4.A, 6.C
BROMM ER PARK
PARK IMPRO VEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This improvement project includes turf removal and replacement to improve conditions, elevations and dimensions.
Amenities include: benches, shade covers, backstop, portable youth soccer goals and outfield fencing. The restroom
roof was replaced in 2018/19 with deferred maintenance funding, and the courts were restriped in 2019/20 partially
funded with donations. Parks continues to pursue grants for this project.
IMPACT TO OPERATIONS:
This project will increase youth opportunity and use by meeting the youth field public health and safety requirements.
Water conservation and efficiency will be increased by the installation of weather-based irrigation controller, moisture
sensors/irrigation controllers and an automatic leak detection and shut-off flow meter.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 904,200 Live Oak Park Dedication Fund $ 22,048
Deferred Maintenance Bond $ 2,429
Preliminary $ - Donations $ 2,500
Design $ - $ -
Acquisition $ - $ -
Construction $ 904,200 $ -
Other $ - Total Project Funding $ 26,977
Total Estimated Cost $ 904,200 Funding Not Yet Identified $ 877,223
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 3,170 $ 2,429 $ 8,496 $ 1 2,882 $ - $ - $ - $ - $ 877,223 $ 904,200
125
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-6 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94950 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: T BD STRATEGIC PLAN: 3.B, 4.A
CARMICHA EL TRAIL
PARK IMPRO VEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Preliminary ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Carmichael Trail extension project includes easement acquisition, design and construction to add approximately 1/4
mile to the existing trail.
IMPACT TO OPERATIONS:
The trail extension is anticipated to increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 120,000 Aptos Park Dedication Fund $ 6,570
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 120,000 $ -
Other $ - Total Project Funding $ 6,570
Total Estimated Cost $ 120,000 Funding Not Yet Identified $ 113,430
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 6,570 $ - $ - $ - $ - $ 113,430 $ 120,000
126
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-7 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 94926, 194956, 194911, 191131, 191152 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00049 STRATEGIC PLAN: 1.A, 4.A, 6.A, 6.C
CHANTICL EER PARK
PHASE 1 IMP ROVEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
Phase 1 development of Chanticleer Park included LEO’s Haven, the first inclusive playground in Santa Cruz County, a
community garden area, pathways, parking, restrooms, and interim off-leash dog areas and bicycle pump
track. Construction was completed in January 2020 and now the park is open to the public.
IMPACT TO OPERATIONS:
The newly developed park provides enhanced outdoor experience. Additional maintenance costs for the newly
developed park are estimated at approximately $75,000 a year.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 4,620,409 Grants $ 8 52,210
Measure G Funds $ 1 ,125,000
Preliminary $ - Live Oak Park Dedication Fund $ 2 23,706
Design $ 502,593 Parks Special Revenue $ 6 36,406
Acquisition $ - Fund 40- District 1 $ 1 56,577
Construction $ 4,664,983 Parks CSA11 Funding $ 2 19,727
Other $ - Donations $ 1 ,953,950
Total Project Funding $ 5 ,167,576
Total Estimated Cost $ 5,167,576 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 307,040 $ 1 ,610,561 $ 3,246,035 $ 3,940 $ - $ - $ - $ - $ - $ 5,167,576
127
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-31 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: T BD DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: T BD STRATEGIC PLAN: 2.B, 4.A, 6.C
CHANTICL EER PARK
PHASE 2 IMP ROVEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: U nfunded PLANNING AREA: L ive Oak
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Phase 2 development of Chanticleer Park includes picnic pavilions including separate reservable picnic areas, tennis and
bocce courts, a small skate feature, rehabilitation and conversion of the existing house into office space, relocation and
refurbishment of the tank house, additional walkways, turf area, and the water recharge element. Initial funding will
come from cost savings from prior phase. Parks continues to pursue grants and other funding sources for this project.
IMPACT TO OPERATIONS:
The additional features at the park will provide enhanced outdoor experience. Additional maintenance costs
associated with the additional park features are to be determined.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 3 ,450,000 TBD $ -
$ -
Preliminary $ - $ -
Design $ 450,000 $ -
Acquisition $ - $ -
Construction $ 3 ,000,000 $ -
Other $ - Total Project Funding $ -
Total Estimated Cost $ 3 ,450,000 Funding Not Yet Identified $ 3,450,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ - $ - $ - $ - $ - $ 3,450,000 $ 3 ,450,000
128
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-8 SUPERVISORIAL DISTRICT(S): 3
MASTER PROJECT NUMBER: 1 91162 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P1161 STRATEGIC PLAN: 4.A, 6.A, 6.C
DAVENPOR T LANDING
RESTROOM R EPLACEMENT
PROJECT TYPE: Park LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: N orth Coast
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
This necessary deferred maintenance project included replacing the restroom.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to reduce maintenance costs by approximately $750/year and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 100,000 Deferred Maintenance Bond $ 145,393
$ -
Preliminary $ - $ -
Design $ 22,953 $ -
Acquisition $ - $ -
Construction $ 122,440 $ -
Other $ - Total Project Funding $ 145,393
Total Estimated Cost $ 145,393 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 8,878 $ 14,074 $ 1 22,440 $ - $ - $ - $ - $ - $ - $ 145,393
129
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-9 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: 1 91132, 191152, 194911 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00018 STRATEGIC PLAN: 1.A, 2.B, 4.A, 4.B, 4.C, 6.A, 6.C
FELTON DISC OVERY PARK
PARK DEVE LOPMENT
PROJECT TYPE: Park LOCATION: North County
FUNDING STATUS: F ully Funded PLANNING AREA: S an Lorenzo
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
This project included construction of a new outdoor discovery park and accessible trail adjacent to the new Felton
Library, including play features, a learning area, plantings and interpretive elements.
IMPACT TO OPERATIONS:
The newly developed park will provide enhanced outdoor experience. Additional maintenance costs for the park are
estimated at approximately $34,000 annually.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 440,000 State Funds $ 1,000,000
Outdoor Edu Facility Grant $ 395,000
Preliminary $ - Measure G Funds $ 400,000
Design $ 235,391 Fund 40- District 5 & Fund Balance $ 102,873
Acquisition $ - Donations $ 224,000
Construction $ 1,886,482 $ -
Other $ - Total Project Funding $ 2,121,873
Total Estimated Cost $ 2,121,873 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 12,038 $ 167,116 $ 1,942,719 $ - $ - $ - $ - $ - $ - $ 2,121,873
130
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-10 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94951 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00154 STRATEGIC PLAN: 4.A, 4.B, 6.C
FREEDO M LAKE
RESTOR ATION
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos Hills
PROJECT STATUS: Preliminary ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Improvements include an evaluation of options for removal of hyacinth and other invasive plants, and the restoration
of open water habitat and recreational access at Freedom Lake.
IMPACT TO OPERATIONS:
Lake restoration is anticipated to preserve park infrastructure assets, reduce maintenance costs and increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 ,000,000 Aptos Hills Park Dedication Fund $ 4 4,819
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 1 ,000,000 $ -
Other $ - Total Project Funding $ 44,819
Total Estimated Cost $ 1 ,000,000 Funding Not Yet Identified $ 9 55,181
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 4 4,819 $ - $ - $ - $ - $ 955,181 $ 1 ,000,000
131
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-11 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 94963,197217,191152,191877,194911 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00318,R00322,R00324,RG4004 STRATEGIC PLAN: 1.A, 2.B, 3.B, 4.A, 4.B, 5.B, 6.C
HEART OF SOQUEL
PHASE 2 AND 3 I MPROVEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: F ully Funded PLANNING AREA: S oquel
PROJECT STATUS: Construction ESTIMATED COMPLETION DATE: 2 020/21
DESCRIPTION & BACKGROUND:
Phases 2 & 3 of the project will extend the Heart of Soquel Park Plaza’s existing pathway and riparian restoration
project, and create a continuous walking loop around Soquel Creek within the Soquel Village, consistent with the
adopted Soquel Village Plan. Construction is anticipated to start in Summer 2020.
IMPACT TO OPERATIONS:
The newly developed park will provide access to natural resources and enhance outdoor experience in parks and
outdoor activities. There will be additional maintenance costs of approximately $55,000 annually starting in 2020/21.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,500,000 Grants $ 1,622,253
Fund 40- District 1 $ 276,111
Preliminary $ - Measure G Funds $ 530,000
Design $ 508,630 Soquel Park Dedication Fund $ 242,217
Acquisition $ 304,172 Former RDA Bond Funds $ 312,435
Construction $ 1,894,933
Other $ 275,281 Total Project Funding $ 2,983,016
Total Estimated Cost $ 2,983,016 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 244,844 $ 159,812 $ 6 00,076 $ 1 ,978,284 $ - $ - $ - $ - $ - $ 2,983,016
132
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-12 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94950, 134989 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P0104, RP1104 STRATEGIC PLAN: 4.A, 6.A, 6.C
HIDDEN BEACH
PLAYGROUND R EPLACEMENT
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Design, Construction ESTIMATED COMPLETION DATE: 2 020/21
DESCRIPTION & BACKGROUND:
The project consists of playground equipment replacement, ADA improvements, and other necessary park
improvements. The Parks Department will be cooperating with community fundraising efforts and proceeding with
grant writing efforts to secure funding for completion of this project.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to reduce maintenance costs and increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 350,000 Aptos Park Dedication Fund $ 103,680
Donations $ 20,706
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 350,000 $ -
Other $ - Total Project Funding $ 124,386
Total Estimated Cost $ 350,000 Funding Not Yet Identified $ 225,614
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 13,605 $ - $ 110,781 $ - $ - $ - $ - $ 225,614 $ 350,000
133
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-13 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: 1 91162 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00005,R00203,R00204,R00215, RP0004, RP1057 STRATEGIC PLAN: 4.A, 5.B, 6.A, 6.C
HIGHLAN DS PARK
DEFERRED MA INTENANCE
PROJECT TYPE: Park LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo
PROJECT STATUS: Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
As part of this necessary deferred maintenance project, the Senior Center was painted and the Children’s Center roof
was replaced in 2017/18. Outstanding items include replacing the main house roof, replacing septic systems, irrigation
water conservation upgrades, painting main house, and parking lot repairs and resurfacing.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 322,000 Deferred Maintenance Bond $ 62,264
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 420,000 $ -
Other $ - Total Project Funding $ 62,264
Total Estimated Cost $ 420,000 Funding Not Yet Identified $ 357,736
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 5 7,264 $ - $ - $ 5,000 $ - $ - $ - $ - $ 357,736 $ 420,000
134
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-14 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 91162 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00205 STRATEGIC PLAN: 6.C
MERK ROAD PROPERTY
ROOF REPL ACEMENT
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: E ureka
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: 2 020/21
DESCRIPTION & BACKGROUND:
This necessary deferred maintenance project includes repairs and/or replacement of the roof.
IMPACT TO OPERATIONS:
Roof upgrades are anticipated to preserve park infrastructure assets, reduce liability, and reduce future maintenance
costs.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 30,000 Deferred Maintenance Bond $ 30,000
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 30,000 $ -
Other $ - Total Project Funding $ 30,000
Total Estimated Cost $ 30,000 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 30,000 $ - $ - $ - $ - $ - $ 30,000
135
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-15 SUPERVISORIAL DISTRICT(S): 4
MASTER PROJECT NUMBER: 1 94958, 191162 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00105 STRATEGIC PLAN: 4.A, 6.A, 6.C
MESA VILL AGE PARK
DEFERRED MAINTENANCE A ND PARK IMPROVEMENTS
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: P ajaro
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
In 2018/19, the restroom roof was replaced. Further improvements, including ADA pathways, are in the preliminary
concept stage.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate TBD Pajaro Park Dedication Fund $ 2 4,624
Deferred Maintenance Bond $ 7,374
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ - $ -
Other $ - Total Project Funding $ 31,998
Total Estimated Cost $ - Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 7,374 $ - $ 2 4,624 $ - $ - $ - $ - $ - $ 31,998
136
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-16 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 91162, 194956 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00056 STRATEGIC PLAN: 4.A, 4.B, 4.D, 6.C
MORAN LA KE PARK
PARK IMPRO VEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Preliminary ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Parks is actively seeking grants to complete the CEQA process, update the habitat management plan, and implement
park improvements, including: habitat restoration; hazard mitigation; removal of non-native trees; restroom
improvements; trail improvements; asphalt parking lot replacement; correction of stream flows to diminish erosion;
interpretative/educational panels; and Monarch Butterfly habitat protection.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to reduce liability and maintenance costs and increase use. There will
be additional maintenance costs for newly developed parts of the park.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 ,000,000 Live Oak Park Dedication Fund $ 13,000
Deferred Maintenance Bond $ 30,000
Preliminary $ 675,000 Liability Fund $ 50,000
Design $ - $ -
Acquisition $ - $ -
Construction $ 1 ,025,000 $ -
Other $ - Total Project Funding $ 93,000
Total Estimated Cost $ 1,700,000 Funding Not Yet Identified $ 1,607,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 5 0,000 $ 6,415 $ - $ 3 6,585 $ - $ - $ - $ - $ 1 ,607,000 $ 1 ,700,000
137
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-17 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: 1 94953 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: T BD STRATEGIC PLAN: 3.B, 4.A, 4.B
OCEAN STREET
EXTENSIO N TRAIL
PROJECT TYPE: Park LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: C arbonera
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
The first phase of this project includes a survey of any existing trail from Ocean Street Extension to the Graham Hill
Showgrounds, and is fully funded. The next phase, based on the survey, will include trail upgrades, new signage and
associated amenities, and is partially funded.
IMPACT TO OPERATIONS:
Trail refurbishment and upgrades are anticipated to reduce maintenance costs and increase access and use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 30,000 Carbonera Park Dedication Fund $ 1 33,092
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 350,000 $ -
Other $ 30,000 Total Project Funding $ 1 33,092
Total Estimated Cost $ 380,000 Funding Not Yet Identified $ 2 46,908
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 133,092 $ - $ - $ - $ - $ 246,908 $ 380,000
138
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-124 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 91152, 194958 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P0009 STRATEGIC PLAN: 4.A, 6.A, 6.C
PINTO LA KE PARK
BIKE PUM P TRACK
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: F ully Funded PLANNING AREA: P ajaro
PROJECT STATUS: Completed ESTIMATED COMPLETION DATE: C ompleted
DESCRIPTION & BACKGROUND:
This project included: construction of a pump track that appeals to all ages and abilities, and access improvements to
the pump track area.
IMPACT TO OPERATIONS:
There is additional maintenance cost of approximately $/ year for the newly developed park feature, which is being
heavily used.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 150,000 Grants $ 15,477
Pajaro Park Dedication Fund $ 46,081
Preliminary $ - Fund 40 - District 4 $ 120,000
Design $ 33,541 $ -
Acquisition $ - $ -
Construction $ 148,017 $ -
Other $ - Total Project Funding $ 181,558
Total Estimated Cost $ 181,558 Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 28,928 $ 152,630 $ - $ - $ - $ - $ - $ - $ - $ 181,558
139
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-18 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 91162, 194958 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00106, R00206, R00207, R00214 STRATEGIC PLAN: 4.A, 4.B, 6.C
PINTO LA KE PARK
DEFERRED MAINTENANC E AND IMPROVEMENTS
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: P ajaro
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This necessary deferred maintenance and improvement project includes: modular administration buildings, bathroom
renovation, playground replacement/refurbishment, water conservation measures, and repairs to the parking lot, pier
and back house.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 ,165,000 Pajaro Park Dedication Fund $ 6 1,345
Deferred Maintenance Bond $ 5 0,000
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 1 ,165,000 $ -
Other $ - Total Project Funding $ 1 11,345
Total Estimated Cost $ 1 ,165,000 Funding Not Yet Identified $ 1,053,655
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 1 0,284 $ - $ 17,448 $ 8 3,615 $ - $ - $ - $ - $ 1,053,653 $ 1 ,165,000
140
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-19 SUPERVISORIAL DISTRICT(S): 5
MASTER PROJECT NUMBER: 1 91162 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00009, R00208, R00213, RP0208 STRATEGIC PLAN: 4.A, 5.B, 6.A, 6.C
QUAIL HOLL OW RANCH
DEFERRED MA INTENANCE
PROJECT TYPE: Park LOCATION: North County
FUNDING STATUS: P artially Funded PLANNING AREA: S an Lorenzo
PROJECT STATUS: Design, Construction ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
As part of this necessary deferred maintenance project, the roof was replaced in 2019/20. Outstanding items include:
electrical and septic systems replacement, barn fencing, and other house repairs: siding, painting, and deck
stabilization.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 300,000 Deferred Maintenance Bond $ 6 3,881
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 400,000 $ -
Other $ - Total Project Funding $ 63,881
Total Estimated Cost $ 400,000 Funding Not Yet Identified $ 3 36,119
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 1,100 $ 62,781 $ - $ - $ - $ - $ - $ 336,119 $ 400,000
141
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-20 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 94956, 134922 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P0065 STRATEGIC PLAN: 4.A, 4.B, 6.C
ROCKVIEW CO ASTAL ACCESS
IMPROV EMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: 2 021/22
DESCRIPTION & BACKGROUND:
This improvement projects includes design and construction of new coastal access and mini-park.
IMPACT TO OPERATIONS:
There will be additional maintenance costs for the newly developed coastal access, which will also increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 550,000 Mid County Coastal Trust Fund $ 3 40,000
Live Oak Park Dedication Fund $ 8,696
Preliminary $ - Donations $ 2,600
Design $ - $ -
Acquisition $ - $ -
Construction $ 550,000 $ -
Other $ - Total Project Funding $ 3 51,296
Total Estimated Cost $ 550,000 Funding Not Yet Identified $ 1 98,704
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 7,001 $ - $ - $ 344,295 $ - $ - $ - $ - $ 198,704 $ 550,000
142
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-21 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 91162, 194951 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00108, RP0108 STRATEGIC PLAN: 4.A, 6.A, 6.C
SCOTT PARK
DEFERRED MAINTENANC E AND IMPROVEMENTS
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos Hills
PROJECT STATUS: Design, Construction ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This project includes deferred maintenance (parking lot repair, stairway replacement) and improvements (electrical
upgrades, additional paving, fencing, and other amenities). A new picnic pavilion was installed in 2019/20.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs,
increase use and revenue from picnic pavilion rentals.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 155,000 Aptos Hills Park Dedication Fund $ 74,738
Deferred Maintenance Bond $ 21,032
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 155,000 $ -
Other $ - Total Project Funding $ 95,770
Total Estimated Cost $ 155,000 Funding Not Yet Identified $ 59,230
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ 2 6,835 $ 68,935 $ - $ - $ - $ - $ 59,230 $ 155,000
143
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-22 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94920, 194950 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P1000, RP1001, R00110 STRATEGIC PLAN: 4.A, 6.A, 6.C
SEACLIFF VIL LAGE PARK
PHASE 2 IMP ROVEMENTS
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Construction ESTIMATED COMPLETION DATE: 2 020/21
DESCRIPTION & BACKGROUND:
In 2019/20, a public permanent restroom was installed, and a skateable feature was constructed by Friends of Santa
Cruz County Parks with donations.
IMPACT TO OPERATIONS:
There will be additional maintenance costs of approximately $28,000 annually for newly developed parts of the park
starting in 2020/21.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 750,000 Parks Special Revenue Fund $ 9,110
Aptos Park Dedication Fund $ 2 67,844
Preliminary $ - In-Kind Donations $ 3 04,034
Design $ 102,796
Acquisition $ - $ -
Construction $ 559,587 $ -
Other $ - Total Project Funding $ 5 80,988
Total Estimated Cost $ 662,383 Funding Not Yet Identified $ 81,395
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 3,161 $ 7 40 $ 2 47,647 $ 25,406 $ - $ - $ - $ - $ 81,395 $ 358,349
144
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-32 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: T BD DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: T BD STRATEGIC PLAN: 4.A, 6.A, 6.C
SEACLIFF VIL LAGE PARK
PHASE 3 IMP ROVEMENTS
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: U nfunded PLANNING AREA: A ptos
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Phase 3 development of Seacliff Village Park includes full landscaping, pathways, a shade structure and an
amphitheater/community gathering area. Initial funding will come from cost savings from prior phase. Parks continues
to pursue grants and other funding sources for this project.
IMPACT TO OPERATIONS:
Additional maintenance costs associated with the additional park features are to be determined.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 800,000 TBD $ -
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 800,000 $ -
Other $ - Total Project Funding $ -
Total Estimated Cost $ 800,000 Funding Not Yet Identified $ 8 00,000
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ - $ - $ - $ - $ - $ 800,000 $ 800,000
145
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-23 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94950 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00107, RP0107 STRATEGIC PLAN: 4.A, 4.B, 6.C
SEASCAPE BEACH COASTAL ACC ESS (VIA PALO ALTO STAIRWAY)
DEFERRED MA INTENANCE
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
In cooperation with the Department of Public Works (DPW), this necessary deferred maintenance project includes:
stairway and drainage design and re-build. Costs to be split 50/50 with DPW.
IMPACT TO OPERATIONS:
Beach access refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance
costs and increase use and safety.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 220,000 Aptos Park Dedication Fund $ 5 0,000
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 695,600 $ -
Other $ - Total Project Funding $ 50,000
Total Estimated Cost $ 695,600 Funding Not Yet Identified $ 6 45,600
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 5,526 $ - $ - $ 4 4,474 $ - $ - $ - $ - $ 645,600 $ 695,600
146
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-24 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94950, 134923 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00100 STRATEGIC PLAN: 3.B, 4.A, 4.C, 6.C
SHORE TRAIL / BEAC H ISLAND PATHWAY
ACCESS IMPR OVEMENTS
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: A ptos
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This project includes: access improvements and repairs on the aging Shore Trail and re-opened Beach Island Pathway,
as well as signage.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 150,000 South County Coastal Trust Fund $ 2 6,382
Aptos Park Dedication Fund $ 2 8,623
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 150,000 $ -
Other $ - Total Project Funding $ 55,005
Total Estimated Cost $ 150,000 Funding Not Yet Identified $ 9 4,995
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ 26,382 $ - $ 2 8,623 $ - $ - $ - $ - $ 94,995 $ 150,000
147
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-25 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 91148, 191162, 194956 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R P0002, RP1156 STRATEGIC PLAN: 1.A, 2.B, 4.A, 5.B, 6.A, 6.C
SIMPKINS FAMIL Y SWIM CENTER
DEFERRED MAINTENANC E AND IMPROVEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: L ive Oak
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: 2 021/22
DESCRIPTION & BACKGROUND:
This necessary deferred maintenance project includes: replacement of water heaters, filters for main pool, chlorine
generator cells, waterslide replacement, pool deck resurfacing and main pool re-plastering. It may be necessary to
temporarily close the pool facility for several months to complete the deferred maintenance, so the pool
improvements should be undertaken in conjunction with the Live Oak Library Annex project and Live Oak Community
Room renovations, to reduce revenue losses.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance and
growing repair costs and increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1,600,000 Measure G Funds $ 1 ,350,000
Deferred Maintenance Bond $ 1 55,656
Preliminary $ - Live Oak Park Dedication Fund $ 1 37,679
Design $ - Donations $ 75,000
Acquisition $ - $ -
Construction $ 3,072,000 $ -
Other $ - Total Project Funding $ 1 ,718,335
Total Estimated Cost $ 3,072,000 Funding Not Yet Identified $ 1 ,353,665
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 109,800 $ 29,850 $ 2 4,721 $ 1 ,553,964 $ - $ - $ - $ - $ 1,353,665 $ 3 ,072,000
148
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-26 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 94963 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00059 STRATEGIC PLAN: 4.A, 4.B, 6.C
SOQUEL LI ONS PARK
PARK IMPRO VEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: S oquel
PROJECT STATUS: Preliminary, Design ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Due to the Soquel Creek bank washout in the 2017 Storm Disaster, the playground had to be removed. Once the creek
bank is stabilized, the future design of the park will be explored to complement the Heart of Soquel Phase 3 trail
extension.
IMPACT TO OPERATIONS:
Park redesign is anticipated to preserve park infrastructure assets, and increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate TBD Soquel Park Dedication Fund $ 1 7,675
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ - $ -
Other $ - Total Project Funding $ 17,675
Total Estimated Cost $ - Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 1 7,675 $ - $ - $ - $ - $ - $ 17,675
149
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-27 SUPERVISORIAL DISTRICT(S): 4
MASTER PROJECT NUMBER: T BD DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: T BD STRATEGIC PLAN: 1.A, 2.B, 4.A
SOUTH C OUNTY
PAR KS
PROJECT TYPE: Park LOCATION: South County
FUNDING STATUS: P artially Funded PLANNING AREA: T BD
PROJECT STATUS: Preliminary ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
Measure G provided funding to explore options and pursue grant funding to provide more park facilities in South
County, especially focusing on youth-oriented outdoor education and recreation.
IMPACT TO OPERATIONS:
New or expanded park facilities are anticipated to increase use. The impact to maintenance costs is unknown at this
time.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate TBD Measure G Funds $ 2 50,000
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ - $ -
Other $ - Total Project Funding $ 2 50,000
Total Estimated Cost $ - Funding Not Yet Identified $ -
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 250,000 $ - $ - $ - $ - $ - $ 250,000
150
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-28 SUPERVISORIAL DISTRICT(S): 1
MASTER PROJECT NUMBER: 1 94963, 194933, 191152, 191133 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00152, R00166 STRATEGIC PLAN: 1.A, 2.B, 3.B, 4.A, 6.C
THE FAR M PARK
PHASE 2 IMP ROVEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: S oquel
PROJECT STATUS: Design, Construction ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
During FY 2020/21, the Parks Department will continue grant writing, design, and construction in stages for Phase 2
development at the Farm Park, including installation of a pedestrian bridge and associated pathways, play and picnic
areas, and a bocce ball court. In partnership with the Mountain Bikers of Santa Cruz, Parks is moving forward with
grant writing, fundraising, and construction of an interim and temporary bike pump track.
IMPACT TO OPERATIONS:
Additional maintenance costs associated with the additional park features are to be determined.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 1 ,919,700 Measure G Funds $ 2 35,000
Soquel Park Dedication Fund $ 1 86,618
Preliminary $ - Fund 40- District 1 $ 9 7,312
Design $ 622,210 Parks Special Revenue Fund $ 2 07,974
Acquisition $ - $ -
Construction $ 3 ,153,662 $ -
Other $ - Total Project Funding $ 7 26,904
Total Estimated Cost $ 3 ,775,872 Funding Not Yet Identified $ 3,048,968
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ 232,534 $ 3 6,615 $ 89,839 $ 367,916 $ - $ - $ - $ - $ 3,048,968 $ 3 ,775,872
151
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-29 SUPERVISORIAL DISTRICT(S): 3
MASTER PROJECT NUMBER: 1 91150 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00010 STRATEGIC PLAN: 2.B, 5.B, 6.A, 6.C
VETERAN'S MEM ORIAL BUILDING
DEFERRED MA INTENANCE
PROJECT TYPE: Park LOCATION: City of Santa Cruz
FUNDING STATUS: P artially Funded PLANNING AREA: C ity of Santa Cruz
PROJECT STATUS: Preliminary ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
This necessary deferred maintenance and improvement project includes: Auditorium ceiling repair, elevator
modernization, wood floor refinishing, seating, stage improvements, flood repairs/mitigation & basement room
dividers.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 307,000 Fund Balance $ 9 5,843
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 462,000 $ -
Other $ - Total Project Funding $ 95,843
Total Estimated Cost $ 462,000 Funding Not Yet Identified $ 3 66,157
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 9 5,843 $ - $ - $ - $ - $ 366,157 $ 462,000
152
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBER: P-P-30 SUPERVISORIAL DISTRICT(S): 2
MASTER PROJECT NUMBER: 1 94963 DISTRICT/CSA: N/A
OTHER PROJECT NUMBERS: R 00061, RP0061 STRATEGIC PLAN: 4.A, 6.C
WILLOWBR OOK PARK
PARK IMPRO VEMENTS
PROJECT TYPE: Park LOCATION: Mid County
FUNDING STATUS: P artially Funded PLANNING AREA: S oquel
PROJECT STATUS: Preliminary ESTIMATED COMPLETION DATE: T BD
DESCRIPTION & BACKGROUND:
The project consists of resurfacing tennis/basketball courts, replacing the restroom roof, and other park
improvements.
IMPACT TO OPERATIONS:
Park refurbishment and upgrades are anticipated to preserve park infrastructure assets, reduce maintenance costs and
increase use.
ESTIMATED PROJECT COSTS FUNDING SOURCES
Initial Estimate $ 50,000 Soquel Park Dedication Fund $ 2 4,548
$ -
Preliminary $ - $ -
Design $ - $ -
Acquisition $ - $ -
Construction $ 50,000 $ -
Other $ - Total Project Funding $ 24,548
Total Estimated Cost $ 5 0,000 Funding Not Yet Identified $ 2 5,452
5 YEAR EXPENDITURE PLAN
Prior Years 2018/19 Act 2019/20 EAs 2020/21 2021/22 2022/23 2023/24 2024/25 Future Years Total
$ - $ - $ - $ 2 4,548 $ - $ - $ - $ - $ 25,452 $ 5 0,000
153
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PARKS FINANCING SUMMARY
APTOS PARK DEDICATION FUND - 21125
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $239,062 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $15,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $254,062 $0 $0 $0 $0
$462,599 $15,000 $15,000 $238,537 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $45,308 PROJECTED EXPENDITURES
P-P-12 HIDDEN BEACH PLAYGROUND $0 $103,680
REPLACEMENT
P-P-6 CARMICHAEL TRAIL IMPROVEMENTS $0 $6,570
P-P-22 SEACLIFF VILLAGE PARK PHASE 2 $238,537 $25,407
IMPROVEMENTS
P-P-23 VIA PALO ALTO STAIRWAY $0 $44,474
P-P-24 SHORE TRAIL IMPROVEMENTS $0 $28,623
$238,537 $254,062
APTOS HILLS PARK DEDICATION FUND - 21160
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $92,722 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $6,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $98,722 $0 $0 $0 $0
$113,557 $6,000 $6,000 $26,835 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $6,000 PROJECTED EXPENDITURES
P-P-10 FREEDOM LAKE - WATER HYACINTH $0 $44,819
REMOVAL
P-P-21 SCOTT PARK IMPROVEMENTS $26,835 $47,903
$26,835 $98,722
BONNY DOON PARK DEDICATION FUND - 21185
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $72,477 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $0 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $72,477 $0 $0 $0 $0
$70,165 $0 $2,312 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $72,477 PROJECTED EXPENDITURES
$0 $72,477
CARBONERA PARK DEDICATION FUND - 21145
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $156,386 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $8,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $164,386 $0 $0 $0 $0
$154,786 $10,000 $1,600 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $31,294 PROJECTED EXPENDITURES
P-P-17 OCEAN STREET EXTENSION TRAIL $0 $133,092
$0 $164,386
EUREKA PARK DEDICATION FUND - 21175
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $131,292 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $3,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $134,292 $0 $0 $0 $0
$126,668 $3,000 $4,624 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $3,000 PROJECTED EXPENDITURES
P-P-2 ALDRIDGE LANE PARK IMPROVEMENTS $0 $37,859
P-P-4 BERT SCOTT ESTATE - ACCESS $0 $93,433
IMPROVEMENTS, ROOF REPLACEMENT
$0 $134,292
154
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PARKS FINANCING SUMMARY
LA SELVA PARK DEDICATION FUND - 21120
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $36,107 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $0 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $36,107 $0 $0 $0 $0
$36,107 $0 $0 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $36,107 PROJECTED EXPENDITURES
$0 $36,107
LIVE OAK PARK DEDICATION FUND - 21130
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $88,370 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $30,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $118,370 $0 $0 $0 $0
$163,682 $30,000 $45,161 $120,473 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $30,000 PROJECTED EXPENDITURES
P-P-5 BROMMER PARK IMPROVEMENTS $5,996 $12,882
P-P-7 CHANTICLEER PARK PHASE 1 $97,186 $3,942
IMPROVEMENTS
P-P-16 MORAN LAKE PARK IMPROVEMENTS $0 $13,000
P-P-20 ROCKVIEW COASTAL ACCESS $0 $1,695
IMPROVEMENTS
P-P-25 SIMPKINS CAPSTONE TURBINES $17,291 $56,851
$120,473 $118,370
NORTH COAST PARK DEDICATION FUND - 21180
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $5,809 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $0 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $5,809 $0 $0 $0 $0
$5,809 $0 $0 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $5,809 PROJECTED EXPENDITURES
$0 $5,809
PAJARO PARK DEDICATION FUND - 21135
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $58,239 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $4,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $62,239 $0 $0 $0 $0
$71,687 $4,000 $4,000 $17,448 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $4,000 PROJECTED EXPENDITURES
P-P-15 MESA VILLAGE PARK IMPROVEMENTS $24,624
P-P-18 PINTO LAKE PARK - BUILDING $17,448 $33,615
IMPROVEMENTS
$17,448 $62,239
SALSIPUEDES PARK DEDICATION FUND - 21190
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $82,449 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $0 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $82,449 $0 $0 $0 $0
$82,449 $0 $0 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $82,449 PROJECTED EXPENDITURES
$0 $82,449
155
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PARKS FINANCING SUMMARY
SAN ANDREAS PARK DEDICATION FUND - 21140
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $12,488 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $0 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $12,488 $0 $0 $0 $0
$10,088 $0 $2,400 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $12,488 PROJECTED EXPENDITURES
$0 $12,488
SAN LORENZO PARK DEDICATION FUND - 21155
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $1,836 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $5,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $6,836 $0 $0 $0 $0
$15,565 $5,000 $6,836 $20,565 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $0 PROJECTED EXPENDITURES
N/A OPERATING TRANSFERS OUT $20,565 $6,836
$20,565 $6,836
SKYLINE PARK DEDICATION FUND - 21165
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $105,093 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $2,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $107,093 $0 $0 $0 $0
$103,093 $2,000 $2,000 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $107,093 PROJECTED EXPENDITURES
$0 $107,093
SOQUEL PARK DEDICATION FUND - 21150
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $238,524 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $10,000 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $248,524 $0 $0 $0 $0
$319,140 $10,000 $5,600 $86,216 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $10,000 PROJECTED EXPENDITURES
P-P-11 HEART OF SOQUEL PHASE 2 & 3 $75,868 $63,385
IMPROVEMENTS
P-P-26 SOQUEL LIONS PARK IMPROVEMENTS $0 $17,675
P-P-28 THE FARM PARK PHASE 2 $10,348 $132,916
IMPROVEMENTS
P-P-30 WILLOWBROOK PARK IMPROVEMENTS $0 $24,548
$86,216 $248,524
SUMMIT PARK DEDICATION FUND - 21170
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $130,493 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $5,300 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $135,793 $0 $0 $0 $0
$125,193 $5,300 $5,300 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $135,793 PROJECTED EXPENDITURES
$0 $135,793
156
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PARKS FINANCING SUMMARY
PARKS CERTIFICATE RESERVE FUND - 21215
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $12,219 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $270 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $12,489 $0 $0 $0 $0
$11,949 $240 $270 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $12,489 PROJECTED EXPENDITURES
$0 $12,489
STATE PARK BONDS ADMIN - 21310
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $0 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $1,245,083 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $1,245,083 $0 $0 $0 $0
$0 $984,775 $1,153,209 $1,153,209 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
P-P-11 HEART OF SOQUEL ACQUISITION $24,554 $0 PROJECTED EXPENDITURES
P-P-11 HEART OF SOQUEL PHASE 2 & 3 $254,616 $1,245,083
P-P-9 FELTON DISCOVERY PARK $395,000 $0
P-P-7 CHANTICLEER PARK $479,039 $0
$1,153,209 $1,245,083
FUND 28 RSA CAPITAL PROJECTS - 28100
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $9,996 $246 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $0 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $9,750 $246 $0 $0 $0
$10,287 $135 $200 $491 CARRY OVER $246 $0 $0 $0 $0
CIP # DESCRIPTION
P-P-28 THE FARM PARK $0 $0 PROJECTED EXPENDITURES
EAST CLIFF STABILIZATION MONITORING $0 $0
RSA/COUNTY COOPERATION $491 $9,750
AGREEMENT CAPITAL PROJECTS
N/A OPERATING TRANSFER OUT $0 $0 $246
$0
$491 $9,750
FUND 42 FORMER RDA BOND FUNDS - 42100
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $42,972 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $775 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $43,747 $0 $0 $0 $0
$39,772 $57 $3,200 $0 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A MISCELLANEOUS CAPITAL PROJECTS $0 $43,747
$0
$0 $43,747
FUND 42 FORMER RDA BOND FUNDS - 42145
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $0 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $0 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $0 $0 $0 $0 $0
$15,985 $0 $245 $16,230 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A TWIN LAKES BEACHFRONT $16,230 $0 PROJECTED EXPENDITURES
$0
$16,230 $0
157
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PARKS FINANCING SUMMARY
FUND 42 FORMER RDA BOND FUNDS - 42217
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $34,608 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $53,497 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $88,105 $0 $0 $0 $0
$102,529 $0 $246 $68,167 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
P-P-11 HEART OF SOQUEL $68,167 $88,105
$68,167 $88,105
FUND 49 APTOS PARKS SPECIAL FUND - 49125
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $340 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $5 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $345 $0 $0 $0 $0
$9,294 $93 $156 $9,110 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $0 PROJECTED EXPENDITURES
P-P-22 SEACLIFF VILLAGE PARK (194920) $9,110 $345
$9,110 $345
FUND 49 LIVE OAK PARKS SPECIAL FUND - 49130
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $10,402 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $143 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $10,545 $0 $0 $0 $0
$593,869 $3,930 $7,644 $591,111 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $10,545 PROJECTED EXPENDITURES
P-P-7 CHANTICLEER PARK (194926) $591,111 $0
$591,111 $10,545
FUND 49 SOQUEL PARKS SPECIAL FUND - 49150
REQUESTED
AVAILABLE 2019/20 2019/20 2019/20 FISCAL YEAR 2020/21 2021/22 2022/23 2023/24 2024/25
FUND CIP ESTIMATED ESTIMATED FUND BALANCE $3,392 $0 $0 $0 $0
BALANCE ESTIMATED ACTUAL ACTUAL REVENUES $40 $0 $0 $0 $0
06/30/19 REVENUE REVENUE EXPEND EXPENDITURES $3,432 $0 $0 $0 $0
$81,428 $664 $1,455 $79,491 CARRY OVER $0 $0 $0 $0 $0
CIP # DESCRIPTION
N/A AVAILABLE LAND OTHER $0 $3,432 PROJECTED EXPENDITURES
P-P-28 THE FARM PARK (194933) $79,491 $0
$79,491 $3,432
158
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
SECTION V
2020/21 Capital Improvement Program
County of Santa Cruz
Unprogrammed Projects
159
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
ROADWAY ESTIMATED
APTOS - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
CATHEDRAL DRIVE FROM TROUT GULCH ROAD TO BURNS AVENUE
R-U-49 COLLECTOR $ 1 ,500,000
- Widen shoulders
R-U-59 SUMNER AVENUE AT RIO DEL MAR BOULEVARD INTERSECTION - Improvements ARTERIAL $ 5 05,163
SPRECKELS DRIVE AND TREASURE ISLAND DRIVE
R-U-60 FROM SOQUEL DRIVE TO APTOS BEACH DRIVE COLLECTOR $ 4 49,034
-Widen for bike lanes and pedestrian improvement
R-U-61 RIO DEL MAR BOULEVARD FROM BEACH DRIVE TO CLIFF DRIVE - Overlay ARTERIAL $ 7 85,809
R-U-62 VALENCIA ROAD FROM TROUT GULCH ROAD TO COX ROAD - Overlay COLLECTOR $ 8 98,067
CLUBHOUSE DRIVE FROM RIO DEL MAR BOULEVARD TO SUMNER AVENUE
R-U-63 COLLECTOR $ 4 49,034
- Overlay
R-U-64 TROUT GULCH ROAD FROM VALENCIA ROAD TO LARSEN ROAD - Overlay ARTERIAL $ 6 73,550
R-U-65 CLIFF DRIVE FROM MARTIN DRIVE TO THE END - Overlay SELECT LOCAL $ 2 80,646
R-U-66 MOOSEHEAD DRIVE FROM WINFIELD ROAD TO THE ESPLANADE - Overlay COLLECTOR $ 2 80,646
SUMNER AVENUE FROM CLUBHOUSE DRIVE TO SEASCAPE BOULEVARD
R-U-67 ARTERIAL $ 3 36,775
- Overlay
R-U-68 CLIFF DRIVE FROM RIO DEL MAR BOULEVARD TO MARTIN DRIVE - Overlay SELECT LOCAL $ 1 68,388
R-U-69 POLO AVENUE FROM SOQUEL DRIVE TO NORTH DRIVE - Improvements SELECT LOCAL $ 1 ,400,000
2018 Estimated Cost $ 7 ,727,113
2023 Escalated Cost $ 8 ,499,824
2028 Escalated Cost $ 9 ,349,807
ROADWAY ESTIMATED
APTOS HILLS - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-70 LARKIN VALLEY ROAD - Overlay, widen shoulders COLLECTOR $ 1 ,683,876
R-U-71 VALENCIA ROAD FROM COX ROAD TO FREEDOM BOULEVARD - Overlay COLLECTOR $ 6 73,550
R-U-72 CALABASAS ROAD FROM WHITE ROAD TO MILE POST 3.0 - Overlay COLLECTOR $ 8 41,938
VALENCIA SCHOOL ROAD FROM TROUT GULCH ROAD TO VALENCIA ROAD
R-U-73 SELECT LOCAL $ 5 61,292
- Overlay
R-U-74 LARKIN VALLEY ROAD FROM HIGHWAY 1 TO BUENA VISTA DRIVE - Overlay COLLECTOR $ 6 73,550
R-U-75 LARKIN VALLEY ROAD FROM BUENA VISTA DRIVE TO MANFRE ROAD - Overlay COLLECTOR $ 5 61,292
2018 Estimated Cost $ 4 ,995,499
2023 Escalated Cost $ 5 ,495,049
2028 Escalated Cost $ 6 ,044,553
ROADWAY ESTIMATED
BONNY DOON - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-76 EMPIRE GRADE ROAD, 0.79 miles north of Heller Drive to Pine Flat Road - Overlay ARTERIAL $ 4 ,490,337
R-U-77 EMPIRE GRADE ROAD, FROM PM 1.7 to ALBA ROAD - Overlay ARTERIAL $ 6 73,550
R-U-78 EMPIRE GRADE ROAD FROM ALBA ROAD TO PM 5.7 - Overlay ARTERIAL $ 5 61,292
R-U-79 EMPIRE GRADE ROAD FROM PM 15.4 TO URBAN LIMITS - Overlay ARTERIAL $ 6 73,550
R-U-80 SMITH GRADE FROM PM 1.17 to BONNY DOON ROAD - Overlay COLLECTOR $ 1 ,010,326
2018 Estimated Cost $ 7 ,409,055
2023 Escalated Cost $ 8 ,149,961
2028 Escalated Cost $ 8 ,964,957
160
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
ROADWAY ESTIMATED
CARBONERA - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-81 EL RANCHO DRIVE, Entire Length - Overlay, Bike lanes ARTERIAL $ 1 ,683,876
R-U-82 BRANCIFORTE DRIVE FROM VINE HILL ROAD TO PM 1.50 - Overlay ARTERIAL $ 6 73,550
LOCKHART GULCH ROAD FROM SCOTTS VALLEY CITY LIMIT TO
R-U-83 COLLECTOR $ 3 92,904
NELSON ROAD - Overlay
R-U-84 LOCKHART GULCH FROM NELSON ROAD TO END - Overlay COLLECTOR $ 4 49,034
LOCKEWOOD LANE FROM GRAHAM HILL ROAD TO SCOTTS VALLEY
R-U-85 COLLECTOR $ 1 12,259
CITY LIMIT - Overlay
2018 Estimated Cost $ 3 ,311,623
2023 Escalated Cost $ 3 ,642,786
2028 Escalated Cost $ 4 ,007,064
ROADWAY ESTIMATED
EUREKA CANYON - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-86 EUREKA CANYON ROAD FROM PM 0.40 TO RIDER ROAD - Overlay ARTERIAL $ 5 45,473
R-U-87 BUZZARD LAGOON ROAD, ENTIRE LENGTH - Overlay SELECT LOCAL $ 6 54,568
R-U-88 RIDER ROAD, ENTIRE LENGTH - Overlay SELECT LOCAL $ 5 45,473
R-U-89 CORRALITOS ROAD AT FREEDOM BOULEVARD - Northbound right turn lane COLLECTOR $ 2 18,189
2018 Estimated Cost $ 1 ,963,703
2023 Escalated Cost $ 2 ,160,073
2028 Escalated Cost $ 2 ,376,081
ROADWAY ESTIMATED
LA SELVA BEACH - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-90 MAR MONTE AVENUE, HIGHWAY 1 TO SAN ANDREAS ROAD - Improve shoulders COLLECTOR $ 2 ,500,000
2018 Estimated Cost $ 2 ,500,000
2023 Escalated Cost $ 2 ,750,000
2028 Escalated Cost $ 3 ,025,000
ROADWAY ESTIMATED
LIVE OAK - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-91 30TH AVENUE/BROMMER STREET INTERSECTION - Signalization ARTERIAL $ 3 92,904
R-U-92 MISSION DRIVE, SOQUEL DRIVE TO END - Overlay COLLECTOR $ 3 92,904
R-U-93 7TH AVENUE AT BROMMER STREET - Intersection signalization ARTERIAL $ 3 36,775
R-U-94 WINKLE AVENUE FROM PARKER STREET TO SOQUEL DRIVE COLLECTOR $ 1 ,500,000
-Widen (also reconstruct existing asphalt concrete)
R-U-95 COMMERCIAL WAY FROM EAST TO MISSION DRIVE - Improvements SELECT LOCAL $ 4 49,034
R-U-96 FLORAL DRIVE FROM 34th AVENUE TO 38th AVENUE - Improvements SELECT LOCAL $ 8 00,000
R-U-97 HARPER STREET FROM EL DORADO AVENUE TO END - Improvements SELECT LOCAL $ 1 ,500,000
MATTISON LANE FROM CHANTICLEER AVENUE TO MACIEL AVENUE SELECT LOCAL $ 6 73,550
R-U-98
- Improvements
R-U-99 MATTISON LANE FROM SOQUEL DRIVE TO END - Improvements SELECT LOCAL $ 1 ,500,000
R-U-100 MISSION DRIVE, UPPER END - Improvements SELECT LOCAL $ 5 00,000
R-U-101 35TH AVENUE FROM PORTOLA DRIVE TO ROLAND DRIVE - Improvements SELECT LOCAL $ 7 50,000
R-U-102 32ND AVENUE FROM PORTOLA DRIVE TO ROLAND DRIVE - Improvements SELECT LOCAL $ 5 50,000
R-U-103 ROLAND DRIVE FROM 30TH AVENUE TO 35TH AVENUE - Improvements SELECT LOCAL $ 7 50,000
R-U-104 36TH AVENUE FROM PORTOLA DRIVE TO EAST CLIFF DRIVE - Improvements SELECT LOCAL $ 1 ,200,000
R-U-105 FRESNO STREET FROM 26th AVENUE TO END - Improvements SELECT LOCAL $ 1 ,000,000
R-U-106 LODE STREET FROM 26th AVENUE TO END - Improvements SELECT LOCAL $ 5 50,000
R-U-107 THURBER LANE FROM SOQUEL DRIVE TO TWIN HILLS DRIVE - Improvements SELECT LOCAL $ 8 98,067
R-U-108 SOQUEL AVENUE AT CHANTICLEER AVENUE, Traffic Signal ARTERIAL $ 4 49,034
R-U-109 COMMERCIAL WAY AT SOQUEL DRIVE/THURBER LANE ARTERIAL $ 2 74,605
Modify intersection and signal
161
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
ROADWAY ESTIMATED
LIVE OAK - UNPROGRAMMED ROAD IMPROVEMENTS CONT.
TYPE COST
R-U-110 CAPITOLA ROAD EXTENSION FROM CAPITOLA ROAD TO SOQUEL AVENUE SELECT LOCAL $ 1 09,842
-Pedestrian Improvements
R-U-111 30TH AVENUE - Scriver Street to Portola Drive Sidewalk Infill SELECT LOCAL $ 5 00,000
R-U-112 38TH AVENUE - Portola Drive to Railroad Crossing Infill SELECT LOCAL $ 3 00,000
R-U-113 COMMERCIAL WAY - 17th Avenue to Soquel Drive SELECT LOCAL $ 3 50,000
R-U-114 HOWE STREET / WINKLE AVENUE - Crosswalks and Sidewalks SELECT LOCAL $ 3 00,000
2018 Estimated Cost $ 1 6,026,716
2023 Escalated Cost $ 1 7,629,387
2028 Escalated Cost $ 1 9,392,326
ROADWAY ESTIMATED
NORTH COAST - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-115 EMPIRE GRADE ROAD FROM JAMISON CREEK ROAD TO END - Overlay ARTERIAL $ 4 3,851
2018 Estimated Cost $ 4 3,851
2023 Escalated Cost $ 4 8,236
2028 Escalated Cost $ 5 3,060
ROADWAY ESTIMATED
PAJARO VALLEY - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-116 PAULSEN ROAD FROM GREEN VALLEY ROAD TO CREEK - Improvements SELECT LOCAL $ 1 ,683,876
R-U-117 AMESTI ROAD FROM PINTO STREET TO VARNI ROAD - Improve shoulders COLLECTOR $ 3 ,500,000
R-U-118 COLLEGE ROAD, ENTIRE LENGTH - Improvements per Freedom Traffic Study ARTERIAL $ 1 ,500,000
GREEN VALLEY ROAD FROM AMESTI ROAD TO PAULSEN ROAD
R-U-119 ARTERIAL $ 3 ,500,000
- Improvements per approved Plan Line
GREEN VALLEY ROAD FROM PAULSEN ROAD TO CASSERLY ROAD
R-U-120 ARTERIAL $ 4 ,000,000
- Improvements per approved Plan Line
R-U-121 BUENA VISTA DRIVE AT BRADFORD ROAD INTERSECTION - Improvements ARTERIAL $ 5 61,292
CASSERLY ROAD FROM GREEN VALLEY ROAD TO HIGHWAY 152
R-U-122 COLLECTOR $ 4 ,000,000
- Widen Shoulder
R-U-123 GREEN VALLEY ROAD AT CASSERLY ROAD INTERSECTION - Improvements ARTERIAL $ 3 03,098
R-U-124 CUTTER DRIVE FROM COLLEGE ROAD TO END - Improvements SELECT LOCAL $ 1 ,908,394
R-U-125 CASSERLY ROAD FROM WHEELOCK ROAD TO 1.1 MILES EAST - Overlay COLLECTOR $ 4 49,034
R-U-126 CASSERLY ROAD FROM HIGHWAY 152 TO 1.1 MILES WEST - Overlay COLLECTOR $ 8 98,067
CALABASAS ROAD FROM WHITE ROAD TO BRADFORD ROAD
R-U-127 SELECT LOCAL $ 1 ,683,876
- Improve shoulders
R-U-128 GREEN VALLEY ROAD FROM HASTINGS LANE TO MELODY LANE - Overlay ARTERIAL $ 3 92,904
R-U-129 CASSERLY ROAD FROM WHEELOCK ROAD TO GREEN VALLEY ROAD - Overlay COLLECTOR $ 1 ,122,584
R-U-130 COLLEGE ROAD FROM HIGHWAY 152 TO LAKEVIEW DRIVE - Improve shoulders ARTERIAL $ 4 49,034
FREEDOM BOULEVARD FROM BUENA VISTA DRIVE TO WATSONVILLE CITY
R-U-131 ARTERIAL $ 2 ,806,461
LIMIT - Improve shoulders
R-U-132 WHEELOCK ROAD - Rehabilitation COLLECTOR $ 8 41,938
R-U-133 GREEN VALLEY ROAD - Pedestrian Improvements SELECT LOCAL $ 2 ,700,000
2018 Estimated Cost $ 3 2,300,558
2023 Escalated Cost $ 3 5,530,614
2028 Escalated Cost $ 3 9,083,675
ROADWAY ESTIMATED
SALSIPUEDES - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-134 COWARD ROAD, ENTIRE LENGTH - Reconstruct ARTERIAL $ 8 98,067
R-U-135 CARLTON ROAD FROM HIGHWAY 129 TO LAKEVIEW ROAD - Widen shoulders COLLECTOR $ 3 ,000,000
2018 Estimated Cost $ 3 ,898,067
2023 Escalated Cost $ 4 ,287,874
2028 Escalated Cost $ 4 ,716,661
162
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
ROADWAY ESTIMATED
SAN ANDREAS - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
HARKINS SLOUGH ROAD FROM BUENA VISTA DRIVE TO WATSONVILLE
R-U-136 COLLECTOR $ 1 ,683,876
CITY LIMIT - Improvements
R-U-137 SHELL DRIVE, ENTIRE LENGTH - Bikeway SELECT LOCAL $ 2 24,516
R-U-138 LEE ROAD, COUNTY PORTION - Overlay COLLECTOR $ 2 80,646
R-U-139 RANCHO ROAD FROM BUENA VISTA DRIVE TO END - Overlay SELECT LOCAL $ 2 80,646
BEACH ROAD AND SHELL ROAD
R-U-140 ARTERIAL $ 3 ,000,000
- Roadway and drainage improvements
2018 Estimated Cost $ 5 ,469,685
2023 Escalated Cost $ 6 ,016,654
2028 Escalated Cost $ 6 ,618,319
ROADWAY ESTIMATED
SAN LORENZO VALLEY - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
SAN LORENZO AVENUE FROM FELTON QUARRY TO HIGHWAY 9
R-U-141 SELECT LOCAL $ 4 49,034
- Widen shoulders
QUAIL HOLLOW ROAD FROM GLEN ARBOR ROAD TO EAST ZAYANTE ROAD
R-U-142 ARTERIAL $ 1 ,500,000
- Improve shoulders
BEAR CREEK ROAD FROM HIGHWAY 9 TO DEER CREEK ROAD
R-U-143 ARTERIAL $ 5 ,000,000
- Shoulder widening
R-U-144 IRWIN WAY, ENTIRE LENGTH- Overlay COLLECTOR $ 3 92,904
QUAIL HOLLOW ROAD FROM GLEN ARBOR ROAD TO EAST ZAYANTE ROAD
R-U-145 ARTERIAL $ 1 ,347,101
- Overlay
WEST ZAYANTE ROAD FROM EAST ZAYANTE ROAD TO QUAIL HOLLOW
R-U-146 SELECT LOCAL $ 1 ,010,326
ROAD - Overlay
R-U-147 BEAR CREEK ROAD FROM HIGHWAY 9 TO 2 MILES EAST - Overlay ARTERIAL $ 1 ,347,101
R-U-148 SCENIC WAY FROM HIGHWAY 9 TO END - Overlay COLLECTOR $ 3 36,775
R-U-149 MEMORY LANE FROM CHINA GRADE TO END - Overlay SELECT LOCAL $ 2 80,646
R-U-150 DEBBIE DRIVE FROM FAIRMONT DRIVE TO FAIRMONT DRIVE - Overlay SELECT LOCAL $ 2 80,646
R-U-151 ALBA ROAD FROM HIGHWAY 9 TO EMPIRE GRADE ROAD - Overlay ARTERIAL $ 8 98,067
R-U-152 RANCHO RIO ROAD FROM NEWELL CREEK ROAD TO END - Overlay COLLECTOR $ 3 36,775
R-U-153 DEBBIE COURT FROM DEBBIE WAY TO END - Overlay SELECT LOCAL $ 2 80,646
R-U-154 MADRONA ROAD FROM HIGHWAY 9 TO SEQUOIA ROAD - Overlay COLLECTOR $ 3 36,775
R-U-155 LOMPICO ROAD FROM LAKE BOULEVARD TO END - Overlay ARTERIAL $ 6 17,422
BOULDER CREEK FROM HIGHWAY 9 TO BIG BASIN WAY
R-U-156 TOWN PLAN $ 1 68,388
- Construct 3 town entry markers
R-U-157 KINGS CREEK ROAD - Overlay 0.67 miles of unpaved road COLLECTOR $ 8 98,067
R-U-158 SYLVAN WAY ENTIRE LENGTH - Reconstruct COLLECTOR $ 4 49,034
R-U-159 WEST DRIVE FROM SEQUOIA DRIVE TO END - Overlay COLLECTOR $ 2 80,646
R-U-160 DOUBLE BOGEY AND WEST HILTON - Resurface SELECT LOCAL $ 5 14,500
2018 Estimated Cost $ 1 6,724,854
2023 Escalated Cost $ 1 8,397,339
2028 Escalated Cost $ 2 0,237,073
ROADWAY ESTIMATED
SKYLINE - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-161 GLENWOOD DRIVE - Overlay, install guardrail ARTERIAL $ 5 00,000
R-U-162 BEAR CREEK ROAD FROM DEER CREEK ROAD TO SUMMIT - Shoulder widening ARTERIAL $ 8 98,067
R-U-163 MT CHARLIE ROAD - Overlay ARTERIAL $ 1 ,010,326
2018 Estimated Cost $ 2 ,408,393
2023 Escalated Cost $ 2 ,649,232
2028 Escalated Cost $ 2 ,914,155
163
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
ROADWAY ESTIMATED
SOQUEL - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
NORTH RODEO GULCH ROAD FROM 0.5 MILES NORTH OF URBAN LIMIT
R-U-164 COLLECTOR $ 2 80,646
TO PM 0.6 - Overlay
R-U-165 NORTH RODEO GULCH ROAD FROM PM 0.6 TO PM 2.0 - Overlay COLLECTOR $ 8 41,938
R-U-166 NORTH RODEO GULCH ROAD FROM PM 2.0 TO Soquel Drive - Overlay COLLECTOR $ 8 41,938
R-U-167 SOUTH RODEO GULCH ROAD FROM SOQUEL DRIVE TO END - Overlay COLLECTOR $ 3 36,775
R-U-168 ORCHARD STREET FROM SOQUEL DRIVE TO END - Improvements SELECT LOCAL $ 9 00,000
R-U-169 CENTER STREET FROM E WALNUT STREET TO SOQUEL DRIVE - Improvements SELECT LOCAL $ 7 50,000
R-U-170 CENTER STREET FROM SOQUEL DRIVE TO BRIDGE STREET - Improvements SELECT LOCAL $ 8 00,000
R-U-171 MONTEREY AVENUE FROM SOQUEL DRIVE TO END - Improvements SELECT LOCAL $ 7 85,809
R-U-172 FAIRWAY DRIVE FROM SOQUEL DRIVE TO HAZZARD STREET - Improvements SELECT LOCAL $ 7 85,809
2018 Estimated Cost $ 6 ,322,916
2023 Escalated Cost $ 6 ,955,208
2028 Escalated Cost $ 7 ,650,729
ROADWAY ESTIMATED
SUMMIT - UNPROGRAMMED ROAD IMPROVEMENTS
TYPE COST
CIP # DESCRIPTION
R-U-173 NORTH RODEO GULCH ROAD FROM PM 1.1 TO PM 2.1 - Overlay ARTERIAL $ 6 73,550
NORTH RODEO GULCH ROAD FROM MOUNTAIN VIEW ROAD TO PM 1.1
R-U-174 ARTERIAL $ 6 73,550
- Overlay
R-U-175 NORTH RODEO GULCH ROAD FROM PM 2.1 TO PM 4.37 - Overlay ARTERIAL $ 1 ,010,326
R-U-176 OLIVE SPRINGS ROAD FROM SOQUEL SAN JOSE ROAD TO END - Overlay SELECT LOCAL $ 8 98,067
R-U-177 SUMMIT ROAD FROM SOQUEL SAN JOSE ROAD TO END - Overlay ARTERIAL $ 1 ,234,843
R-U-178 EVERGREEN LANE FROM DEERFIELD ROAD TO SUNSET LANE - Overlay SELECT LOCAL $ 1 68,388
R-U-179 SKYVIEW TERRACE FROM EVERGREEN LANE TO END - Overlay SELECT LOCAL $ 2 80,646
LOMA PRIETA ROAD FROM MAYMENS FLAT TO END
R-U-180 SELECT LOCAL $ 1 ,683,876
- Widen to 16 feet and pave road
2018 Estimated Cost $ 6 ,623,247
2023 Escalated Cost $ 7 ,285,572
2028 Escalated Cost $ 8 ,014,129
2018 Estimated Cost $ 1 17,725,280
COUNTYWIDE UNPROGRAMMED ROAD IMPROVEMENTS 2023 Escalated Cost $ 1 29,497,808
2028 Escalated Cost $ 1 42,447,589
ROADWAY ESTIMATED
APTOS - UNPROGRAMMED ROADSIDE IMPROVEMENTS*
TYPE COST
CIP # DESCRIPTION
R-U-181 SUMNER AVENUE ARTERIAL $ 2 ,155,362
R-U-182 FREEDOM BOULEVARD ARTERIAL $ 6 28,647
R-U-183 BONITA DRIVE COLLECTOR $ 5 38,840
R-U-184 PINEHURST DRIVE COLLECTOR $ 4 04,130
R-U-185 APTOS BEACH DRIVE COLLECTOR $ 6 2,865
R-U-186 CATHEDRAL DRIVE COLLECTOR $ 1 ,250,109
R-U-187 CLIFF DRIVE COLLECTOR $ 5 92,725
R-U-188 CLUBHOUSE DRIVE COLLECTOR $ 1 ,077,681
R-U-189 DOLPHIN DRIVE COLLECTOR $ 1 97,575
R-U-190 E LEDYARD WAY COLLECTOR $ 2 15,536
R-U-191 MAR VISTA DRIVE COLLECTOR $ 2 69,420
R-U-192 MCGREGOR DRIVE COLLECTOR $ 1 ,217,780
R-U-193 MESA DRIVE COLLECTOR $ 4 74,180
R-U-194 RIO DEL MAR BOULEVARD COLLECTOR $ 5 05,163
R-U-195 SEARIDGE ROAD COLLECTOR $ 1 27,975
R-U-196 SPRECKELS DRIVE COLLECTOR $ 1 21,239
R-U-197 TOWNSEND DRIVE COLLECTOR $ 5 81,948
R-U-198 TREASURE ISLAND DRIVE COLLECTOR $ 1 43,691
R-U-199 VALENCIA ROAD COLLECTOR $ 6 57,385
R-U-200 VIENNA DRIVE COLLECTOR $ 6 14,278
164
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
ROADWAY ESTIMATED
APTOS - UNPROGRAMMED ROADSIDE IMPROVEMENTS CONT.*
TYPE COST
R-U-201 TROUT GULCH ROAD COLLECTOR $ 7 97,484
R-U-202 APTOS STREET SELECT LOCAL $ 8 0,826
R-U-203 APTOS SCHOOL ROAD SELECT LOCAL $ 2 02,065
R-U-204 VALENCIA STREET SELECT LOCAL $ 1 01,032
R-U-205 BERNAL STREET SELECT LOCAL $ 6 7,355
R-U-206 POLO DRIVE FROM SOQUEL DRIVE TO END LOCAL $ 1 ,122,584
R-U-207 CENTER AVENUE FROM BROADWAY TO SPRECKLES DRIVE LOCAL $ 1 ,683,876
2018 Estimated Cost $ 1 5,891,751
2023 Escalated Cost $ 1 7,480,927
2028 Escalated Cost $ 1 9,229,019
ROADWAY ESTIMATED
APTOS HILLS - UNPROGRAMMED ROADSIDE IMPROVEMENTS*
TYPE COST
CIP # DESCRIPTION
R-U-208 FREEDOM BOULEVARD ARTERIAL $ 6 29,175
2018 Estimated Cost $ 6 29,175
2023 Escalated Cost $ 6 92,092
2028 Escalated Cost $ 7 61,302
ROADWAY ESTIMATED
CARBONERA - UNPROGRAMMED ROADSIDE IMPROVEMENTS*
TYPE COST
CIP # DESCRIPTION
R-U-209 SIMS ROAD - Pedestrian Facilities COLLECTOR $ 1 ,347,101
2018 Estimated Cost $ 1 ,347,101
2023 Escalated Cost $ 1 ,481,811
2028 Escalated Cost $ 1 ,629,992
ROADWAY ESTIMATED
LA SELVA - UNPROGRAMMED ROADSIDE IMPROVEMENTS*
TYPE COST
CIP # DESCRIPTION
R-U-210 MAR MONTE AVENUE FROM SAN ANDREAS ROAD TO ALTIVO AVENUE COLLECTOR $ 3 36,775
R-U-211 SAN ANDREAS ROAD ARTERIAL $ 3 05,361
2018 Estimated Cost $ 6 42,136
2023 Escalated Cost $ 7 06,350
2028 Escalated Cost $ 7 76,985
ROADWAY ESTIMATED
LIVE OAK - UNPROGRAMMED ROADSIDE IMPROVEMENTS*
TYPE COST
CIP # DESCRIPTION
R-U-212 SOQUEL AVENUE ARTERIAL $ 1 ,481,811
R-U-213 SOQUEL DRIVE ARTERIAL $ 5 71,171
R-U-214 CAPITOLA ROAD EXTENSION COLLECTOR $ 4 25,684
R-U-215 EL DORADO AVENUE COLLECTOR $ 7 54,376
R-U-216 15TH AVENUE COLLECTOR $ 3 23,305
R-U-217 5TH AVENUE COLLECTOR $ 1 50,875
R-U-218 40TH AVENUE COLLECTOR $ 2 58,643
R-U-219 MACIEL AVENUE COLLECTOR $ 4 52,625
R-U-220 PAUL MINNIE AVENUE COLLECTOR $ 1 93,983
R-U-221 RODRIGUEZ STREET FROM CAPITOLA ROAD EXTENSION TO 7TH AVENUE COLLECTOR $ 8 78,310
R-U-222 38TH AVENUE COLLECTOR $ 5 81,948
R-U-223 THURBER LANE FROM SOQUEL DRIVE TO SEQUOIA DRIVE COLLECTOR $ 2 42,479
R-U-224 26TH AVENUE COLLECTOR $ 5 11,899
R-U-225 WINKLE AVENUE COLLECTOR $ 4 74,180
R-U-226 WEBSTER STREET COLLECTOR $ 2 04,760
R-U-227 OPAL CLIFFS DRIVE COLLECTOR $ 9 05,252
R-U-228 EAST CLIFF DRIVE FROM 9TH AVENUE TO 13TH AVENUE ARTERIAL $ 4 72,320
165
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
ROADWAY ESTIMATED
LIVE OAK - UNPROGRAMMED ROADSIDE IMPROVEMENTS CONT.*
TYPE COST
R-U-229 EAST CLIFF DRIVE FROM 17th AVENUE TO PALISADES AVENUE ARTERIAL $ 7 24,956
R-U-230 BROMMER FROM 7TH TO CAPITOLA CITY LIMIT - Feasibility study for bikeway ARTERIAL $ 2 05,800
R-U-231 SIDEWALK INFILL PROJECTS - Various Locations TBD
2018 Estimated Cost $ 9 ,814,378
2023 Escalated Cost $ 1 0,795,815
2028 Escalated Cost $ 1 1,875,397
ROADWAY ESTIMATED
PAJARO VALLEY - UNPROGRAMMED ROADSIDE IMPROVEMENTS*
TYPE COST
CIP # DESCRIPTION
R-U-232 BRADFORD ROAD FROM CALABASAS ROAD TO BUENA VISTA DRIVE SELECT LOCAL $ 1 ,122,584
R-U-233 GREEN VALLEY ROAD - Improvements per approved Plan Line ARTERIAL $ 6 73,550
AIRPORT BOULEVARD FROM GREEN VALLEY ROAD TO WATSONVILLE
R-U-234 ARTERIAL $ 6 73,550
CITY LIMIT
R-U-235 LAKEVIEW DRIVE FROM CRESTWOOD DRIVE TO MEREDITH WAY ARTERIAL $ 7 29,679
R-U-236 HOLOHAN ROAD FROM COLLEGE ROAD TO LAKEN DRIVE HIGHWAY $ 7 85,809
FREEDOM BOULEVARD FROM WATSONVILLE CITY LIMITS TO
R-U-237 ARTERIAL $ 1 ,683,876
URBAN SERVICES LINE
R-U-238 LAKEVIEW DRIVE, AT END - Improve access to levee ARTERIAL $ 2 24,516
R-U-239 COFFEY LANE, ENTIRE LENGTH SELECT LOCAL $ 3 08,710
R-U-240 EMME LANE, ENTIRE LENGTH SELECT LOCAL $ 3 36,775
R-U-241 LONE PINE AVENUE, ENTIRE LENGTH SELECT LOCAL $ 3 92,904
R-U-242 MANFRE ROAD, ENTIRE LENGTH SELECT LOCAL $ 1 ,347,101
R-U-243 MEMORIAL AVENUE, ENTIRE LENGTH SELECT LOCAL $ 3 36,775
R-U-244 MONUMENT AVENUE, ENTIRE LENGTH SELECT LOCAL $ 3 92,904
R-U-245 MINTO ROAD, SOUTH SIDE, ENTIRE LENGTH SELECT LOCAL $ 6 73,550
R-U-246 AMESTI ROAD COLLECTOR $ 2 80,646
2018 Estimated Cost $ 9 ,962,933
2023 Escalated Cost $ 1 0,959,227
2028 Escalated Cost $ 1 2,055,149
SAN LORENZO VALLEY ROADWAY ESTIMATED
-UNPROGRAMMED ROADSIDE IMPROVEMENTS* TYPE COST
CIP # DESCRIPTION
R-U-247 MARION AVENUE, Quail Hollow Road to school COLLECTOR $ 3 92,904
R-U-248 LAUREL STREET and LOMOND STREET, Highway 236 to Highway 9 SELECT LOCAL $ 5 05,163
R-U-249 FELTON, downtown - Improvements per town plan TOWN PLAN $ 3 ,367,752
R-U-250 BOULDER CREEK, downtown - Improvements per town plan TOWN PLAN $ 2 ,806,461
GLEN ARBOR ROAD AND QUAIL HOLLOW ROAD
R-U-251 ARTERIAL $ 4 49,034
FROM HIGHWAY 9 TO MARION AVENUE
R-U-252 MAIN STREET FROM MILL STREET TO HIGHWAY 9 COLLECTOR $ 4 49,034
R-U-253 MAIN STREET FROM HIGHWAY 9 TO POST OFFICE COLLECTOR $ 4 49,034
R-U-254 FELTON, three locations - Install Felton entry signs per town plan TOWN PLAN $ 5 6,129
GRAHAM HILL ROAD, East Zayante Road to Roaring Camp - Sidewalks,
R-U-255 ARTERIAL $ 2 ,806,461
bike lanes and new bridge
2018 Estimated Cost $ 1 1,281,971
2023 Escalated Cost $ 1 2,410,169
2028 Escalated Cost $ 1 3,651,185
166
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
ROADWAY ESTIMATED
SOQUEL - UNPROGRAMMED ROADSIDE IMPROVEMENTS*
TYPE COST
CIP # DESCRIPTION
R-U-256 41ST AVENUE, north of Hwy 1 ARTERIAL $ 4 36,379
R-U-257 PORTER STREET ARTERIAL $ 6 54,568
R-U-258 SOQUEL SAN JOSE ROAD ARTERIAL $ 8 18,210
R-U-259 MAIN STREET, south of Soquel Drive COLLECTOR $ 6 10,930
R-U-260 RODEO GULCH ROAD COLLECTOR $ 4 36,379
R-U-261 PORTER GULCH ROAD COLLECTOR $ 4 36,379
R-U-262 CENTER STREET SELECT LOCAL $ 6 54,568
R-U-263 SOQUEL DRIVE FROM OCEAN HONDA TO 41ST AVENUE ARTERIAL $ 2 00,000
R-U-264 SOQUEL DRIVE AT VARIOUS LOCATIONS ARTERIAL $ 1 ,000,000
R-U-265 SOQUEL DRIVE FROM MATTISON LANE TO 41ST AVENUE ARTERIAL $ 7 50,000
2018 Estimated Cost $ 5 ,997,413
2023 Escalated Cost $ 6 ,597,154
2028 Escalated Cost $ 7 ,256,870
ROADWAY ESTIMATED
SUMMIT - UNPROGRAMMED ROADSIDE IMPROVEMENTS*
TYPE COST
CIP # DESCRIPTION
BRANCIFORTE DRIVE FROM GRANITE CREEK ROAD TO HAPPY VALLEY ARTERIAL $ 2 ,000,000
R-U-266
ROAD - Improve shoulders
2018 Estimated Cost $ 2 ,000,000
2023 Escalated Cost $ 2 ,200,000
2028 Escalated Cost $ 2 ,420,000
2018 Estimated Cost $ 5 7,566,859
COUNTYWIDE UNPROGRAMMED ROAD IMPROVEMENTS 2023 Escalated Cost $ 6 3,323,545
2028 Escalated Cost $ 6 9,655,899
*Roadside Improvements may include curb, gutter, sidewalk, street trees, and drainage improvements.
Unprogrammed Road and Roadside Improvements last updated by CPI in 2018.
167
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS UNPROGRAMMED PROJECTS
FREEDOM COUNTY SANITATION DISTRICT ESTIMATED
JURISDICTION
UNPROGRAMMED PROJECTS COST
CIP # DESCRIPTION
SW-U-5 Behlar Road Sewer Replacement 4TH DISTRICT $ 1 ,220,000
SW-U-9 Freedom Sewer Manhole Rehabilitation 2ND/4TH DISTRICT $ 2 60,000
SW-U-10 Pauline Pump Station Generator 2ND DISTRICT $ 2 00,000
2020 Estimated Cost $ 1 ,680,000
2025 Escalated Cost $ 1 ,848,000
2030 Escalated Cost $ 2 ,032,800
RECYCLING AND SOLID WASTE ESTIMATED
JURISDICTION
UNPROGRAMMED PROJECTS COST
CIP # DESCRIPTION
RL-U-6 Transfer Station at Buena Vista 2ND DISTRICT $26,000,000
RL-U-7 Buena Vista Storm Water Pond(s) 2ND DISTRICT $2,000,000
RL-U-8 Buena Vista Various Stormwater Improvements 2ND DISTRICT $1,200,000
RL-U-9 Ben Lomond Various Stormwater Improvements 5TH DISTRICT $500,000
RL-U-10 Buena Vista Facility Maintenance (Various) 2ND DISTRICT $1,000,000
RL-U-11 Ben Lomond Facility Maintenance (Various) 5TH DISTRICT $1,000,000
2020 Estimated Cost $31,700,000
2025 Escalated Cost $35,480,000
2030 Escalated Cost $39,638,000
DAVENPORT COUNTY SANITATION DISTRICT ESTIMATED
JURISDICTION
UNPROGRAMMED PROJECTS COST
CIP # DESCRIPTION
SW-U-11 Davenport Water Tank Rehabilitation Project 3RD DISTRICT $ 1 38,500
2020 Estimated Cost $ 1 38,500
2025 Escalated Cost $ 1 52,350
2030 Escalated Cost $ 1 67,585
168
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PARKS UNPROGRAMMED PROJECTS
UNPROGRAMMED PARKS PROJECTS: PARKS FUTURE NEEDS LIST
ESTIMATED
AREA PARK DESCRIPTION CIP # CATEGORY
COST
Aptos Area Beaches - Regional Park
Aptos Aptos Beaches P-U-34 Improvements $ 5 64,000
Development
Aptos Creek Park - Neighborhood Park New Park
Aptos Aptos Creek Park P-U-35 $ 5 41,000
Planning And Development Development
Aptos Jr High School Aptos Junior High School Park - New Park
Aptos P-U-36 $ 7 9,000
Park Neighborhood Park Development Development
Aptos Jennifer/Haas Park Jennifer/Haas Park - Land Acquisition P-U-37 Acquisition $ 2 ,255,900
New Park
Aptos Jennifer/Haas Park Jennifer/Haas Park - Park Development P-U-38 $ 7 89,600
Development
New Park
Aptos Mar Vista School Park Mar Vista School Park - Park Development P-U-39 $ 1 69,200
Development
Aptos Polo Ground Park Complete Parking Lot P-U-40 Improvements $ 5 4,100
Polo Grounds - Neighborhood Park Future Phase Park
Aptos Polo Ground Park P-U-41 $ 5 64,000
Development Development
Future Phase Park
Aptos Polo Ground Park Polo Grounds - Community Park Development P-U-42 $ 7 ,218,900
Development
Aptos Porter Sesnon Park Porter Sesnon Park - Land Acquisition P-U-43 Acquisition $ 1 ,945,700
Aptos Porter Sesnon Park Porter Sesnon Park - Land Acquisition P-U-44 Acquisition $ 3 ,891,400
New Park
Aptos Porter Sesnon Park Porter Sesnon Park - Park Development P-U-45 $ 6 76,800
Development
New Park
Aptos Porter Sesnon Park Porter Sesnon Park - Park Development P-U-46 $ 1 ,128,000
Development
Aptos High School Park - Community Park New Park
Aptos Hills Aptos High School Park P-U-47 $ 7 7,300
Development Development
Bert Scott Park - Neighborhood Park New Park
Aptos Hills Bert Scott Estate P-U-48 $ 4 41,500
Development Development
Aptos Hills Castro Adobe Castro Adobe P-U-49 Improvements $ 5 51,800
Aptos Hills Freedom Blvd Park Freedom Blvd Park - Land Acquisition P-U-50 Acquisition $ 2 ,207,400
New Park
Aptos Hills Freedom Blvd Park Freedom Blvd Park - Park Development P-U-51 $ 7 72,600
Development
New Park
Aptos Hills Freedom Lake Freedom Lake - Park Development P-U-52 $ 5 51,800
Development
City of Santa Emeline Campus- Lot
Clean Up & Repurpose P-U-53 Improvements $ 6 4,900
Cruz Next To Bldg K
City of Santa
Government Center Repurpose South Lawn P-U-54 Improvements $ 3 24,600
Cruz
City of Santa Government Center &
Replace Irrigation & Improve Landscape P-U-55 Improvements $ 2 16,400
Cruz Emeline
City of Tree Work - Remove Stone Pine Trees (Prior Deferred
Freedom Campus P-U-56 $ 3 7,900
Watsonville To Parking Lot Work) Maintenance
City of
Freedom Campus Parking Lot: Lighting, Ada, Drainage, Paving P-U-57 Improvements $ 3 24,600
Watsonville
Future Phase
Eureka Canyon Aldridge Lane Park Complete Phase 2 P-U-58 $ 5 41,000
Development
Bert Scott Estate - Community Park New Park
Eureka Canyon Bert Scott Estate P-U-59 $ 4 41,500
Development Development
New Park
La Selva Place De Mer Park Place De Mer Park - Park Development P-U-60 $ 4 41,500
Development
7th Avenue and Brommer Street Park - Park New Park
Live Oak 7th/Brommer Park P-U-61 $ 1 ,324,400
Development Development
Live Oak Brommer Park Restroom & Irrigation Improvements P-U-62 Improvements $ 5 4,100
Live Oak Cabrillo Avenue Park Cabrillo Avenue Park - Land Acquisition P-U-63 Acquisition $ 1 ,103,700
New Park
Live Oak Cabrillo Avenue Park Cabrillo Avenue Park - Park Development P-U-64 $ 5 51,800
Development
Live Oak Chaminade Uplands Chaminade Uplands - Land Acquisition P-U-65 Acquisition $ 6 ,622,100
New Park
Live Oak Chaminade Uplands Chaminade Uplands - Park Development P-U-66 $ 1 ,765,900
Development
Live Oak Coastview Drive Park Coastview Drive Park - Land Acquisition P-U-67 Acquisition $ 3 75,300
New Park
Live Oak Coastview Drive Park Coastview Drive Park - Park Development P-U-68 $ 1 43,500
Development
169
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PARKS UNPROGRAMMED PROJECTS
UNPROGRAMMED PARKS PROJECTS: PARKS FUTURE NEEDS LIST
ESTIMATED
AREA PARK DESCRIPTION CIP # CATEGORY
COST
Live Oak Corcoran Beach Corcoran Beach - Access Improvements P-U-69 Improvements $ 4 41,500
Improvements or
Live Oak Floral Park Play Area & Turf Renovation P-U-70 Deferred $ 1 62,300
Maintenance
New Park
Live Oak Harper Street East Park Harper Street East - Park Development P-U-71 $ 6 62,200
Development
Improvements,
Misc Fence & Bridge Repairs, Expand
Live Oak Jose Avenue Park P-U-72 Deferred $ 4 3,300
Gardens
Maintenance
Live Oak Area Beaches (Incl Corcoran, E. Cliff
Live Oak Live Oak Beaches P-U-73 Acquisition $ 5 51,800
& Johann's Beaches) - Land Acquisition
Live Oak Live Oak School Park Live Oak School - Land Acquisition P-U-74 Acquisition $ 1 89,800
New Park
Live Oak Live Oak School Park Live Oak School - Park Development P-U-75 $ 5 5,200
Development
New Park
Live Oak Lode Street Park Lode Street Park - Park Development P-U-76 $ 2 31,800
Development
Live Oak Mattison Lane Park Mattison Lane - Land Acquisition P-U-77 Acquisition $ 2 ,207,400
New Park
Live Oak Mattison Lane Park Mattison Lane - Park Development P-U-78 $ 7 72,600
Development
Live Oak Moran Lake Park Beach & Roadway Repairs P-U-79 Improvements $ 5 9,500
Portola Drive/Rodeo Portola Drive/Rodeo Gulch Park - Land
Live Oak P-U-80 Acquisition $ 5 51,800
Gulch Park Acquisition
Portola Drive/Rodeo Portola Drive/Rodeo Gulch Park - Park New Park
Live Oak P-U-81 $ 7 17,400
Gulch Park Development Development
Katherine Lane - (Santa Cruz Garden) Park Future Phase Park
Live Oak Santa Cruz Garden Park P-U-82 $ 1 65,600
Development Development
Simpkins Family Swim
Live Oak Install Exercise Equipment P-U-83 Improvements $ 5 4,100
Center
Simpkins Family Swim Deferred
Live Oak Replace Roof P-U-84 $ 3 24,600
Center Maintenance
Simpkins Family Swim
Live Oak Winter Cover Warm Water Pool P-U-85 Improvements $ 1 ,082,000
Center
Live Oak Sunny Cove Beach Sunny Cove Beach - Access Improvements P-U-86 Improvements $ 1 ,103,700
Live Oak Twin Hills Park Twin Hills Park - Land Acquisition P-U-87 Acquisition $ 2 20,700
New Park
Live Oak Twin Hills Park Twin Hills Park - Park Development P-U-88 $ 2 20,700
Development
Live Oak Twin Lakes Park Drainage and Fencing P-U-89 Improvements $ 2 1,600
Rental Houses Repairs (Roof/Paint/Windows) Deferred
Live Oak Winkle Farm Park P-U-90 $ 5 4,100
and Demolish Barn Maintenance
Future Phase Park
Live Oak Winkle Farm Park Winkle Farm - (Phase II) Park Development P-U-91 $ 4 41,500
Development
multiple Multiple Sites Install Exercise Equipment P-U-92 Improvements $ 1 08,200
Tree Inventory & Create Tree Inventory & Maintenance Plan
multiple P-U-93 Improvements $ 1 08,200
Maintenance Plan For All Parks
Northcoast Beaches Plan Implementation
North Coast North Coast Beaches P-U-94 Improvements $ 1 ,103,700
(Scott Creek Restroom, Etc.)
Greyhound Rock Beach Site Improvements and Coastal Trail Improvements, New
North Coast P-U-33 $ 1 ,460,000
Access Development Trail Development
Pajaro Valley Misc. School Sites Misc. School Sites P-U-95 Improvements $ 1 ,103,700
Future Phase Park
Pajaro Valley Pinto Lake Park Pinto Lake - Park Development P-U-96 $ 2 ,759,200
Development
South County Park Acquisition, New
Pajaro Valley Acquisition, Design, Development P-U-97 $ 6 ,816,800
(Assume 3 Acres) Park Development
Neighborhood/Community Park - Land
Salsipuedes Salsipuedes Park P-U-98 Acquisition $ 2 ,207,400
Acquisition
Neighborhood/Community Park - Park New Park
Salsipuedes Salsipuedes Park P-U-99 $ 2 ,207,400
Development Development
170
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
PARKS UNPROGRAMMED PROJECTS
UNPROGRAMMED PARKS PROJECTS: PARKS FUTURE NEEDS LIST
ESTIMATED
AREA PARK DESCRIPTION CIP # CATEGORY
COST
Ben Lomond Library & Deferred
San Lorenzo Buildings Repairs P-U-100 $ 4 31,100
Wilder Hall Maintenance
San Lorenzo Ben Lomond Park River Access Project P-U-101 Improvements $ 8 11,500
Ben Lomond River Park - Neighborhood Park
San Lorenzo Ben Lomond Park P-U-102 Acquisition $ 2 42,800
Expansion Land Acquisition
Ben Lomond River Walk - Neighborhood Park
San Lorenzo Ben Lomond Park P-U-103 Acquisition $ 2 7,600
Land Acquisition
Boulder Creek Junction Boulder Creek Junction Park - (Downtown, New Park
San Lorenzo P-U-104 $ 2 7,100
Park Boulder Creek Recreation District) Development
Felton Covered Bridge
San Lorenzo Restroom P-U-105 Improvements $ 2 70,500
Park
Felton Covered Bridge Felton - Equestrian Improvements Per Village
San Lorenzo P-U-106 Improvements $ 5 ,500
Park Plan
Highlands Park - Reconfigure Fields, Ada,
San Lorenzo Highlands Park Bleachers, Extend Road, Remove Pool, P-U-107 Improvements $ 1 ,082,000
Reroof Restroom
Lompico Community New Park
San Lorenzo Lompico Community Center - Development P-U-108 $ 4 41,500
Center Development
Miller Property - Master Plan and New Park
San Lorenzo Miller Property P-U-109 $ 5 51,800
Improvements Development
New Park
San Lorenzo Pace Family Wilderness Pace Family Wilderness - Park Development P-U-110 $ 4 41,500
Development
Deferred
San Lorenzo Quail Hollow Ranch Replace Bridge Across Q.H. Brook P-U-111 $ 4 32,800
Maintenance
San Lorenzo Quail Hollow Ranch Pond Dam Upgrades P-U-112 Improvements $ 7 0,300
Future Phase Park
San Lorenzo Quail Hollow Ranch Quail Hollow Ranch - Park Development P-U-113 $ 3 ,311,000
Development
San Lorenzo Wilder Hall Access & Building Improvements P-U-114 Improvements $ 3 2,500
San Lorenzo Zayante Park Zayante Community Park - Land Acquisition P-U-115 Acquisition $ 9 93,300
New Park
San Lorenzo Zayante Park Zayante Community Park - Development P-U-116 $ 6 62,200
Development
Skyline Skyline Park Community Park - Land Acquisition P-U-117 Acquisition $ 6 62,200
New Park
Skyline Skyline Park Community Park - Park Development P-U-118 $ 9 93,300
Development
Anna Jean Cummings
Soquel Water Re-Charge Facility Improvements P-U-119 Improvements $ 5 4,100
Park
Improvements or
Anna Jean Cummings
Soquel Renovate Athletic Fields, Drainage, Irrigation P-U-120 Deferred $ 1 89,400
Park
Maintenance
The Farm Park - Future Farm Park & Community Center - Park Future Phase
Soquel P-U-121 $ 1 0,878,000
Phase Development Development
unknown Maintenance Yard Maintenance Yard - Land Acquisition P-U-122 Acquisition $ 3 ,311,000
New Park
unknown Maintenance Yard Maintenance Yard - Development P-U-123 $ 1 ,324,400
Development
TOTAL PARKS FUTURE NEEDS $ 9 4,270,400
*Increased by California Construction Cost Index CCCI of 3.6%
171
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
SECTION VI
2020/21 Capital Improvement Program
County of Santa Cruz
Appendix
172
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
The County of Santa Cruz Strategic Plan 2018-2024
OUR VISION
Santa Cruz County is a healthy, safe and more affordable community that is culturally diverse, economically
inclusive and environmentally vibrant.
OUR MISSION
An open and responsive government, the County of Santa Cruz delivers quality, data-driven services that
strengthen our community and enhance opportunity.
OUR VALUES
The County of Santa Cruz provides services and supports partnerships built on:
Accountability Effectiveness Support
Collaboration Innovation Transparency
Compassion Respect Trust
FOCUS AREAS
1. Comprehensive Health & Safety
A. HEALTH EQUITY: Promote a safe and healthy community that nurtures body and mind across all
ages and social conditions.
B. COMMUNITY SUPPORT: Provide access to food and basic support through integrated health
care and social services.
C. LOCAL JUSTICE: Increase public safety through practices, partnerships and transformative
opportunities that respect victims and reduce recidivism.
D. BEHAVIORAL HEALTH: Support residents and improve community impacts through increased
access to integrated mental health, substance use disorder and health care services.
2. Attainable Housing
A. AFFORDABLE HOUSING: Partner to develop affordable housing, lower barriers to housing
solutions, and access new funding sources.
B. COMMUNITY DEVELOPMENT: Sustain and rejuvenate communities by integrating places to live,
work and play.
C. LOCAL INVENTORY: Increase and diversify housing options through smart growth programs,
adaptive reuse and innovation.
D. HOMELESSNESS: Expand services to reduce homelessness and increase housing stability.
3. Reliable Transportation
A. REGIONAL MOBILITY: Improve road infrastructure and intra-county connectivity, and enhance
commuting solutions.
B. COMMUNITY MOBILITY: Grow alternative transportation networks, and lower barriers to mobility.
C. LOCAL ROADS: Upgrade pavement conditions and road safety for everyone.
D. PUBLIC TRANSIT: Work to enhance functionality and promote use of public transit.
173
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
4.Sustainable Environment
A. OUTDOOR EXPERIENCE: Ensure access to and enhance experience in parks, open spaces, water
areas and outdoor activities.
B. NATURAL RESOURCES: Protect and restore natural resources, including water, air, forests,
coastline and agricultural lands.
C. LOCAL CONSERVATION: Support and strengthen efforts for clean air and water, conservation,
renewable energy, recycling and reuse.
D. CLIMATE CHANGE: Increase resilience to climate change impacts, including sea-level rise and
changing weather patterns.
5.Dynamic Economy
A. REGIONAL WORKFORCE: Create opportunities to develop a quality workforce and increase
family-wage jobs in support of the regional economy.
B. COMMUNITY VITALITY: Stimulate vibrant and inclusive economies offering robust shopping,
dining, cultural and gathering spaces.
C. LOCAL BUSINESSES: Strengthen and retain small businesses and key sectors through innovation,
flexibility and technology.
D. EDUCATIONAL OPPORTUNITY: Support partnerships that promote early learning, higher
education, and vocational and lifelong studies.
6. Operational Excellence
A. CUSTOMER EXPERIENCE: Provide our customers with equitable access to efficient, effective and
culturally responsive services.
B. COUNTY WORKFORCE: Attract, grow and retain a diverse, engaged and high - performing County
workforce that reflects our community.
C. COUNTY INFRASTRUCTURE: Maximize and responsibly maintain County assets in support of
community goals.
D. CONTINUOUS IMPROVEMENT: Embrace innovation and continuous improvement to optimize
County operations and maintain fiscal stability.
https://www.santacruzcounty.us/VisionSantaCruz.aspx
174
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
COUNTY PLANNING AREAS MAP
175
COUNTY OF SANTA CRUZ FINAL 2020/21 CAPITAL IMPROVEMENT PROGRAM
CIP NUMBERING SYSTEM
The 2020/21 Capital Improvement Program (CIP) project numbering system has been revised to provide
easier identification of improvement projects. The new numbering system uses a three-part identifier
sequence as follows:
1. Part one is the project type identifier.
Project Type Project Identifier
County Facilities and Projects C
County Service Areas CSA
Flood Control and Drainage FD
Parks P
Recycling and Landfill RL
Road/Transportation R
Sewer and Water SW
Storm Damage Public Works
2011 Storm Damage S2011
2016 Storm Damage S2016
2017 Storm Damage S2017
2. Part two shows whether the project is currently programmed (project is included in the current budget
cycles) or unprogrammed (project is not currently included due to limited or no funding available).
Project Type Project Identifier
Programmed P
Unprogrammed U
3. Part three is the unique number that is assigned to the project based on project type. This number will
never change regardless of whether the project is programmed or unprogrammed.
Using the project Buena Vista Landfill Organics Processing Facility as an example, the project type is
Recycling and Landfill. The project is also a programmed project. The CIP number for this project is as
shown below. This project will always have the number “3” assigned to it as the third Recycling and Landfill
project of the CIP numbering system.
RL-P-3
176
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
GLOSSARY
DRAINAGE IMPROVEMENTS
F & G Fish & Game
F & W Fish & Wildlife
ZONE 5 Flood Control and Water Conservation District Zone 5
ZONE 6 Flood Control and Water Conservation District Zone 6
ZONE 7 Flood Control and Water Conservation District Zone 7
ZONE 7A Flood Control and Water Conservation District Zone 7A
ZONE 8 Flood Control and Water Conservation District Zone 8
RSA Redevelopment Successor Agency Funds
USDA US Department of Agriculture - Emergency Watershed Protection
IMPROVEMENT TYPES
AW Asphalt Walkway
CS Concrete Sidewalk
CCGS/W Concrete Curb, Gutter and Sidewalk
CCGS/WST Concrete Curb, Gutter, Sidewalk and Street Trees
PARK IMPROVEMENTS
APDF Aptos Park Dedication Fund
AHPDF Aptos Hills Park Dedication Fund
BDPDF Bonny Doon Park Dedication Fund
CPDF Carbonera Park Dedication Fund
ECPDF Eureka Canyon Park Dedication Fund
LSPDF La Selva Beach Park Dedication Fund
LOPDF Live Oak Park Dedication Fund
NCPDF North Coast Park Dedication Fund
PVPDF Pajaro Valley Park Dedication Fund
SPPDF Salsipuedes Park Dedication Fund
SAPDF San Andreas Park Dedication Fund
SLPDF San Lorenzo Park Dedication Fund
SKPDF Skyline Park Dedication Fund
SOPDF Soquel Park Dedication Fund
SUPDF Summit Park Dedication Fund
APP Art in Public Places
CERTS Certificates of Participation
CSA 11 County Service Area 11
FEMA Federal Emergency Management Agency Funds
FUND 42 Fund 42
ME County Measure E Earthquake Repair Funds
ORV Off Road Vehicle Fund
PDF Park Dedication Funds
PLT Plant Acquisition Fund - Parks
RSA Redevelopment Successor Agency Funds
R-Z Roberti Z'Berg Funds
SBW State Boating and Waterways
SCC State Coastal Conservancy
SCS U. S. Soil Conservation Service
SPB State Park Bond Funds
SWCB State Wildlife Conservation Board
ROAD IMPROVEMENTS
AB2766 Air Pollution Control Grant Funds - Assembly Bill 2766
ARRA Federal American Recovery and Reinvestment Act
177
COUNTY OF SANTA CRUZ 2020/21 CAPITAL IMPROVEMENT PROGRAM
GLOSSARY
ATIF Aptos Transportation Improvement Fund
ATP Active Transportation Program
B&W Boating and Waterways Funding
BTA Caltrans Bicycle Transportation Account
CALTRANS California Department of Transportation
CBTP Community Based Transportation Planning Funds
CSA 9 County Service Area 9 - Highway Safety and Lighting
ER Federal Emergency Relief Funds
EXCH State Match Exchange Funds Thru Caltrans
FAS Federal Aid to Secondary Road Systems
FAU Federal Aid to Urban Road Systems
FEMA Federal Emergency Management Agency Funds
FUND 42 Fund 42
HPB Highway Bridge Program
HBRR Federal Highway Bridge Reconstruction and Rehabilitation Funds
HSIP Federal Highway Safety Improvement Program
INS Insurance
IWRP Integrated Watershed Restoration Program
LOTIF Live Oak Transportation Improvement Fund
OES State Office of Emergency Services Funds
PVTIF Pajaro Valley Transportation Improvement Fund
PUC Public Utilities Commission (Railway crossings)
ROAD (RD) County Road Fund
RSA Redevelopment Successor Agency Funds
RSTP Regional Surface Transportation Program Funds
RSTPX Regional Surface Transportation Program Exchange Funds
SR2S State Safe Routes to School Funds
SRTS Federal Safe Routes to School Funds
STIF Soquel Transportation Improvement Fund
STIP State Transportation Improvement Program
STP Federal Surface Transportation Program Funds
TDA Transportation Development Act (Bikeways)
ROADSIDE IMPROVEMENTS
ARIF Aptos Roadside Improvement Fund
CRIF Carbonera Roadside Improvement Fund
FUND 42 Fund 42
LORIF Live Oak Roadside Improvement Fund
PVRIF Pajaro Valley Roadside Improvement Fund
SRIF Soquel Roadside Improvement Fund
CRA Coastal Resources Agency
RSA Redevelopment Successor Agency Funds
178
COUNTY OF SANTA CRUZ 2019/20 CAPITAL IMPROVEMENT PROGRAM
ALPHABETICAL PROJECT LISTING
PROJECT NAME PAGE
2018 Full Depth Recycle and Overlay Project........................................................................... 52
2018 Measure D Resurfacing Project........................................................................................ 35 - 36
2019 Measure D Resurfacing Project........................................................................................ 37 - 38
2020 Measure D Resurfacing Project........................................................................................ 39 - 40
2020 RSTP-STIP Resurfacing Projects..................................................................................... 42
2021 Measure D Resurfacing Project........................................................................................ 41
Agricultural Weights and Measures, Mosquito and Vector Control Office Remodel................. 9
Aldridge Lane Park - Park Improvements.................................................................................. 122
Aptos Village Park Deferred Maintenance................................................................................. 123
Aptos Village Plan Improvements Phase I and II....................................................................... 62
Ben Lomond Sediment Pond Repair.......................................................................................... 85
Ben Lomond Transfer Station Lighting Retrofit Project............................................................. 84
Bert Scott Estate Deferred Maintenance.................................................................................... 124
Boulder Creek Wastewater Treatment Plant Equalization Tank and Mixer Replace................ 86
Brimblecom Road at San Lorenzo River Bridge Replacement.................................................. 87
Brommer Park - Park Improvements.......................................................................................... 125
Buena Vista Drive Road Rehabilitation Project.......................................................................... 63
Buena Vista Landfill Mini-Flare................................................................................................... 64
Buena Vista Landfill Organics Processing Facility..................................................................... 65
Buena Vista Landfill Transfer Station......................................................................................... 66
Capital Projects: Animal Services - Animal Shelter Renovation Project.................................... 10
Capital Projects: Highway 1 Mar Vista Bicycle and Pedestrian Overcrossing........................... 11
Capital Projects: Library Project - Aptos Branch Library............................................................ 13
Capital Projects: Library Project - Boulder Creek Branch Library.............................................. 14
Capital Projects: Library Project - Felton Branch Library........................................................... 15
Capital Projects: Library Project - La Selva Beach Branch Library............................................ 16
Capital Projects: Library Project - Live Oak Branch Library....................................................... 17
Capital Projects: Library Project - Live Oak Library Annex........................................................ 18
Capital Projects: Monterey Bay Scenic Sanctuary Trail Segments 10-11................................. 12
Carmichael Trail Park Improvements......................................................................................... 126
Chanticleer Park Phase 1 Improvements................................................................................... 127
Chanticleer Park Phase 2 Improvements................................................................................... 128
Coastal Ecosystem Resiliency Project for the Lower Watsonville Slough USACE Cap .......... 67
Conference Drive at Zayante Creek Bridge Scour Mitigation.................................................... 88
Davenport Drinking Water Improvements Phase III.................................................................. 76
Davenport Landing Restroom Replacement.............................................................................. 129
Davenport Recycled Water Project............................................................................................ 77
East Cliff 17th Avenue to Palisades Avenue Pedestrian Improvements................................... 54
East Cliff Drive from 7th Avenue to 14th Avenue Pedestrian Improvements............................ 53
179
COUNTY OF SANTA CRUZ 2019/20 CAPITAL IMPROVEMENT PROGRAM
ALPHABETICAL PROJECT LISTING
PROJECT NAME PAGE
East Zayante Road at Zayante Creek Concrete Bridge Spall repair......................................... 89
Either Way at San Lorenzo River Bridge Replacement............................................................. 90
Enhanced Rainfall Monitoring Equipment X-Band Radar Facility ............................................. 43
Felton Discovery Park - Park Development............................................................................... 130
Fern Drive at San Lorenzo River Bridge Replacement.............................................................. 91
Forest Hill Drive at Bear Creek Bridge Replacement................................................................. 92
Freedom Lake Restoration......................................................................................................... 131
Freedom Sewer Rehabilitation Phase I ..................................................................................... 44
Freedom Sewer Rehabilitation Phase II .................................................................................... 45
General Services Department: County Office Building Improvements...................................... 19
General Services Department: Solar Installation Project........................................................... 20
Green Valley Road at Casserly Creek Tributary Bridge Replacement...................................... 46
Health Services Agency: 1060 Emeline and 1430 Freedom Blvd, Ste B Window Replace...... 22
Health Services Agency: 1060/1070 Emeline Various - Emeline Campus............................... 21
Health Services Agency: 1080 Emeline Remodel - Emeline Campus...................................... 23
Health Services Agency: 1430 Freedom Boulevard, Suite D Reception................................... 24
Health Services Agency: Behavioral Health Office Building - Freedom Campus Watsonv...... 25
Health Services Agency: Front Street........................................................................................ 26
Health Services Agency: Harbor Vet Remodel (Behavioral Health Unit).................................. 27
Health Services Agency: Various Buildings............................................................................... 28
Heart of Soquel Phase 2 and 3 Improvements.......................................................................... 132
Hidden Beach Playground Replacement................................................................................... 133
Highland Parks Deferred Maintenance...................................................................................... 134
Holohan Road at Highway 152 Intersection Improvements....................................................... 80
La Madrona Drive Guardrail Replacement................................................................................. 93
La Madrona Drive, El Rancho Road and Swanton Road Guardrail Replacement.................... 47
Larkspur Street at San Lorenzo River Bridge Replacement...................................................... 94
Lompico Road at Lompico Creek Bridge Replacement............................................................. 95
Los Arboles Pump Station Drainage Improvements.................................................................. 81
Main Street Improvements......................................................................................................... 55
Merk Road Property Roof Replacement.................................................................................... 135
Mesa Village Park Deferred Maintenance and Park Improvements.......................................... 136
Monument Avenue Sewer Extension......................................................................................... 68
Moran Lake Park - Park Improvements..................................................................................... 137
Ocean Street Extension Trail..................................................................................................... 138
Pajaro River Flood Risk Reduction Project Design and Construction....................................... 48
Parks 2016 and 2017 Storm Disasters...................................................................................... 121
Pinehurst and Greenbrier Pedestrian Improvements................................................................ 69
Pinto Lake Park Bike Pump Track............................................................................................. 139
180
COUNTY OF SANTA CRUZ 2019/20 CAPITAL IMPROVEMENT PROGRAM
ALPHABETICAL PROJECT LISTING
PROJECT NAME PAGE
Pinto Lake Park Deferred Maintenance and Improvements...................................................... 140
Place De Mer (CSA 2) Stair Repair............................................................................................ 70
Pleasant Way at San Lorenzo River Bridge Replacement........................................................ 96
Public Safety and Justice: Juvenile Hall Multi-Use Recreation Building.................................... 29
Public Safety and Justice: Juvenile Hall Renovation and Upgrades (Seed to Table)............... 30
Public Safety and Justice: Rountree Rehabilitation and Re-Entry Project................................ 31
Public Works 2016 Storm Damage Various Projects................................................................ 103
Public Works Financing Summary for Various Funds............................................................... 115 - 119
Public Works March 2011 Storm Damage Various Projects..................................................... 102
Public Works Storm Damage Individual Project Lists................................................................ 105 - 114
Public Works Winter 2017 Storm Damage Various Projects..................................................... 104
Quail Hollow Ranch Deferred Maintenance............................................................................... 141
Quail Hollow Road at Zayante Creek Bridge Replacement....................................................... 97
Rancho Rio Avenue at Newell Creek Bridge Replacement....................................................... 98
Redwood Road at Brown's Creek Tributary Bridge Replacement............................................. 71
Rio Del Mar Flats Drainage Project............................................................................................ 72
Rockview Coastal Access Improvements.................................................................................. 142
San Lorenzo Way at San Lorenzo River Bridge Replacement.................................................. 99
Scott Park Deferred Maintenance and Improvements............................................................... 143
Seacliff Village Park Phase 2 Improvements............................................................................. 144
Seacliff Village Park Phase 3 Improvements............................................................................. 145
Seascape Beach Coastal Access (via Palo Alto Stairway) Deferred Maintenance.................. 146
Shore Trail / Beach Island Pathway Access Improvements...................................................... 147
Simpkins Family Swim Center Deferred Maintenance and Improvements............................... 148
Soquel Drive at Robertson Street Intersection Signalization..................................................... 58
Soquel Drive to 41st Avenue Dedicated Right Turn Lane......................................................... 56
Soquel Drive to Soquel Avenue Dedicated Right Turn Lane..................................................... 57
Soquel Lions Park - Park Improvements.................................................................................... 149
South County Parks.................................................................................................................... 150
State Park Drive Improvements Seacliff Village........................................................................ 73
Striping and Guardrail Improvements........................................................................................ 49
Swanton Road and Old Santa Cruz Highway Clean / Paint Steel Bridge Members................. 50
Swanton Road at Big Creek Bridge Replacement..................................................................... 78
The Farm Park Phase 2 Improvements..................................................................................... 151
Trembley Lane Lift Station Pump Replacement/Relocation...................................................... 82
Two Bar Road at Two Bar Creek Bridge Rehabilitation ............................................................ 100
Valencia Road at Valencia Creek and Spreckels Drive at Aptos Creek Bridge Embank ......... 74
Veteran's Memorial Building Deferred Maintenance ................................................................. 152
Widen Capitola Road from 7th Avenue to 17th Avenue from Two Lanes to Four Lanes......... 59
181
COUNTY OF SANTA CRUZ 2019/20 CAPITAL IMPROVEMENT PROGRAM
ALPHABETICAL PROJECT LISTING
PROJECT NAME PAGE
Widen Capitola Road from Chanticleer Avenue to 30th Avenue from Two Lanes to Four....... 60
Willowbrook Park - Park Improvements..................................................................................... 153
182
APPENDIX 4:
ZONE A
FORMATION RESOLUTION
(NO. 726-69)
APPENDIX 5:
ZONE B
FORMATION RESOLUTION
(NO. 80-72)
APPENDIX 6:
ZONE C
FORMATION RESOLUTION
(NO. 352-82)
APPENDIX 7:
ZONE D1, D2, AND D3
FORMATION RESOLUTION
(NO. 42-89)
APPENDIX 8:
ZONE E
FORMATION RESOLUTION
(NO. 634-91)
J '/..;;
. ~·
~ . ..::..
f
. . " --
>~,,.. ATTACHMENT A
f'
\..
BEFORE THE BOARD OF SUPERVISORS ..... 646
OF THE COUNTY OF SANTA CRUZ. STATE OF CALIFORNIA
RESOLUTION NO. 634-91
On the motion of Supervisor Patton
duly seconded by Supervisor Belgard
the following resolution is adopted:
RESOLUTION EXTENDING THE 5COPE OF ANO PROVIDING FOR AOOITIONAL
AUTHORIZED SERVICES WITHIN COUNTY SERVICE AREA NO. 9 FOR STREETSCAPE
MAINTENANCE AND RELATED ACTIVITIES ANO ESTABLISHI~ZONE 2.f._OF THE
SERVICE AREA LOCATED WITHIN THE LIVE OAK/SOQUEL REOEVELOPMENr-i>ROJECT AREA
WHEREAS, pursuant to County Service Area Law (commencing with Section
25210.1 of the Government Code of the State of California), on April 16
1991. the Board of Supervisors of the County of Santa Cruz adopted Reso1l u
tion No. 216-91 initiating proceedings to add services to County Service
Area No. 9 and to establish Zone 9E of the service area for streetscape
maintenance and related activities; and,
WHEREAS, on September 4 1991, the Local Agency Formation Commission
1
of Santa Cruz County adopted Resolution No. 779, authorizing said proceed
; ngs; and
WHEREAS, this Board by its Resolution No. 573-91 adopted September 24,
1991 declared its intention to add services and establish Zone 9E of
1
County Service Area No. 9 for the purposes of streetscape maintenance and
related activities; and
WHEREAS, said Resolution No. 573-91 established November 5, 1991, at
the hour of 9:30 A.M. in the Board of Supervisors Chambers. 701 Ocean
Street in Santa Cruz, as the time and place for public hearing on said
add1t1on of authorized services and establishment of Zone 9E of County
Service Area Ho. 9; and
WHEREAS, at the time and place fixed, a 50% protest pursuant to Gov
ernment Code Section 25210.34a was not received against either the addition
of services to the service area or the establishment of Zone 9E of the
service area.
NOW, THEREFORE BE IT RESOLVED ANO ORDERED by the Board of Supervisors
of Santa Cruz County. California. that said Board of Supervisors does
hereby so declare and determine that authorized services for the purposes
of streetscape maintenance and related activities are added to the already
existing services of the service area and that Zone 9E is established
within the Live Oak/Soquel Redevelopment Project Area.
196
Resolution No. € -91
,.
Page 2 .
647
BE IT FURTHER RESOLVED ANO ORDERED that the extended services proposed
to be performed by County Service Area No. 9 shall be limited to activities
related to the upkeep and maintenance requirements of the County's
Streetscape Program including purchase of streetscape materials, installa
tion, construction and replacement of streetscape materials. and ongoing
maintenance.
BE IT FURTHER RESOLVED ANO ORDERED that the Local Agency formation
Commission is hereby authorized to file the necessary reports as required
in Section 54900 of the Government Code.
PASSED ANO ADOPTED by the Board of Supervisors of the County of Santa
Cruz. State of California, this 5th day of November • 1991. by the fol-
lowing vote: --
AYES: SUPERVISORS Beau·tz, Levy, Patton, Belgard, Keeley
NOES: SUPERVISORS None
ABSENT: SUPERVISORS None
ABSTAINED: ·SUPERVISORS None
to form:
Assistant County Counsel
Distribution: County Counsel
LAFCO
Parks
Public Works
I
Planning STATE OF CALIFORNIA ) ss
COUNTY OF SAl'!TA CRUZ J
Clerk of the Board
1, SUSAN A. MAUAlEU.·J. C'ot.:nty Adrnlnlstr1tlv1
Redevelopment
Otlicer a11d e~-otricio C:.:-r~ :: ! :he Seard of Sup11r·
1 •1is::"•S ot :he Courrt'f ~: ':.!.,ta Cruz. Slate at
f --~.l;.:.;:niu ·JO ~ere!;v :-=. :.~ .:-~~ ·.~.~ fo~e·;:;o!nq i5
. ; .. .. I
:r,~: ~'.~" :~~·~;,'.J -~~,':~, .,~~ ~ :~~~~~~~~~s::~~~~~
' .. ~ ~ ' ~ rl!t1Jn 10 ;
...
i
-
-~ )'
BEFORE THE BOARD OF SUPERVISORS
OF THE COUNTY OF SANTA CRUZ, STATE OF CALIFORNIA
RESOLUTION NO. 573-91
On the mot 1o n of Supervisor Levy
duly seconded by Supervisor Patton
the following resolution is adopted:
RESOLUTION OF INTENTION TO EXTEND THE SCOPE OF AHO PROVIDE FOR ADDITIONAL
AUTHORIZED SERVICES WITHIN COUNTY SERVICE AREA NO. 9 FOR STREETSCAPE
MAINTENANCE ANO RELATED ACTIVITIES ANO TO ESTABLISH ZONE 9E OF THE
SERVICE AREA LOCATED WITHIN THE LIVE OAK/SOQUEL REOEVELOPMtRf PROJECT
WHEREAS, pursuant to County Service Area Law (commencing with Section
25210.3 of the Government Code of the State of California). on April 16,
1991, the Board of Supervisors of the County of Santa Cruz adopted Resolu
tion No. 216-91 initiating proceedings to extend the scope of and provide
for additional authorized services within County Service Area 9 for
streetscape maintenance and related activities and to establish Zone 9E of
the Service Area located within the Live Oak/Sequel Redevelopment Project;
and
WHEREAS, on September 4, 1991, the Local Agency formation Commission
of Santa Cruz County adopted Resolution No. 779, authorizing said proceed
ings.
NOW, THEREFORE BE IT RESOLVED by the Board of Supervisors that:
1. Under the terms of the Government Code, it is proposed to
e~tend
the scope of and provide for additional authorized services
within County Service No. 9 for streetscape maintenance and
related activities and to establish Zone 9E of the Service Area
which coincides with the boundaries of the Live Oak/Soquel Rede
velopment Project Area.
2. The purpose of extending the scope of services ta County Service
Area No. 9 is to provide for streetscape maintenance and related
activities within the Service Area. The purpose for establishing
Zone 9E of the Service Area is to create a zone of benefit for ·
streetscape services.
3. The extended services proposed to be performed by County Service
Area No. 9 shall be limited to activities related to the upkeep
and maintenance requirements of the County's Streetscape Program
including purchase of streetscape materials, installation, con
struction and replacement of streetscape materials, and ongoing
maintenance.
,
'
4. Sufficient funds to pay for any service which may be provided by
the County Service Area will be available from service charges
collected pursuant to Government Code Section 25210.77a.
5. On November 5, 1991, at 9:30 a.m., in the Board of Supervisors
Chambers. 701 Ocean Street, Santa Cruz. California, a public
hearing shall be held on the extension of services and the estab
lishment of Zone 9E of the area within the Live
ser~1ce
Oak/Soquel Redevelopment Area
7. At such hearing the Board of Supervisors shall hear and receive
any oral and written protests, objections. or evidence which
shall be made, presented, or filed with respect to the proposed
extension of services and establishment of Zone 9E.
8. Any owner of land within the territory, any registered voter
residing within the territory, or any other interested person may
file a written protest against the addition of services and/or
establishment of Zone 9E. Such written protests must be filed
with the Clerk of the Board of Supervisors on or before the time
fixed for the hearing on the proposed addition of services and
establishment of Zone 9E.
BE IT FURTHER RESOLVED that the Board of Supervisors directs the Clerk
to post, circulate. and publish a notice of the hearing once in a newspaper
of general circulation at least 15 days prior to the hearing. wh1ch notice
shall state the text of this resolution.
PASSED AND ADOPTED by the Board of Supervisors of the County of Santa
Cruz, State of California, this 24th day of September, 1991, by
the following vote:
AYES: SUPERVISORS Beautz, Levy, Patton, Belgard & Keeley
NOES: SUPERVISORS None
ABSENT: SUPERVISORS None
ABSTAINED: SUPERVISORS None
I
I s; ATE OF CALIFORNIA 1
COUNTY OF SANTA CRUZ ) SS
1. SUSAN A. MAURIELLO, County Administra1i,.,
Approved as to form:
1Officer and ex-o:fir.:c. Cl~rk of the Goard of Supe1
: visors 01 :ne Coc.;~·i! ot Sar.ta Cruz, State ur
! California d0 hcr<J'l t .~er11fy :hat u·,.,, foregoing is
; a !rue ana c:irrt.,:t r.t;oy ol a tt!solt.1t•On passeJ
;. ~· ." JdOPled iiy. an~1 on~erec: in lhe minu~es of :~-,
l;;aid ouad. In wit:-:C'~.- wherecl \ h<"('e h rnllnlo
Counsel j .~e1 my . an , ; '"ed the seal • t sa1•l
Soard on 19 _ _,__
1
(-c-.
Distribution: LAFCO
County Counsel
Parks
Public Works
Planning
C1erk of the Board
Redevelopment
.....
APPENDIX 9:
ZONE F
FORMATION RESOLUTION
(NO. 101-2016)