LAFCO
MSR SOI Update 262020
Read the report at Local Agency Formation Commissions ↗
County Service Area #8 – Palo Cedro
and
County Service Area #11 – French Gulch
Municipal Service Review &
Sphere of Influence Update
Commission Approved
February 6, 2020
SHASTA LOCAL AGENCY FORMATION COMMISSION
Commissioners
Les Baugh, County Member - District 5 Supervisor
Joe Chimenti, County Member & Vice Chair - District 1 Supervisor
Stan Neutze, City Member – City of Anderson
Larry Farr, City Member - City of Shasta Lake
Brenda Haynes, Special District Member - Anderson Cottonwood Irrigation District
Irwin Fust, Special District Member & Chair - Clear Creek Community Services District
Larry Russel, Public Member
Alternate Members:
Mary Rickert, County Member - District 3 Supervisor
Michael Daquisto, City Member - City of Redding
Patricia A. Clarke, Special District Member – Anderson Fire Protection District
Katherine Ann Campbell, Public Member
Shasta LAFCO Staff:
George Williamson, AICP, Executive Officer
Kathy Bull, Office Manager
James M. Underwood, Legal Counsel
Planwest Partners Staff:
Colette Metz, Analyst, AICP
Krystle Heaney, Services Specialist
Jason Barnes, GIS Analyst
Raquel Menanno, Services Specialist
Acknowledgements:
LAFCO staff would like to thank the contributors to this Municipal Service Review. Input instrumental
in completing this report was provided by Charleen Beard, Supervising Engineer with the Shasta
County Public Works Department.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 2 February 2020
Table of Contents
INTRODUCTION ______________________________________________________________ 4
Uses of the Report __________________________________________________________________ 5
Review Methods ____________________________________________________________________ 6
Common Topics for Each Agency Profile _________________________________________________ 6
Agency Profiles and Determinations ______________________________________________ 8
CSA # 8 Palo Cedro __________________________________________________________________ 9
CSA # 11 French Gulch ______________________________________________________________ 20
Figures
Figure 1: CSA # 8 Palo Cedro Boundary and Sphere
Figure 2: CSA # 8 Palo Cedro Land Use Designations
Figure 3: CSA # 11 French Gulch Boundary and Sphere
Tables
Table 1. CSA # 8 Revenues and Expenditures
Table 2 - CSA # 8 Residential In-Service Area Rate Schedule -
Table 3 – CSA # 8 Mobile Home Park In-Service Area Rate Schedule -
Table 4 CSA # 8 Water Meter Connection Fees
Table 5 CSA #11 Revenues and Expenditures
Table 6 - CSA #11 Residential In-Service Area Rate Schedule - Effective December 1, 2013
Table 7 – CSA #11 Mobile Home Park In-Service Area Rate Schedule - Effective December 1, 2013
Table 8 CSA #11 Water Meter Connection Fees
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 3 February 2020
COUNTY SERVICE AREAS # 8 & #11
Introduction
This Municipal Service Review (MSR) and Sphere of Influence (SOI) Update provides information
about County Service Area #8 – Palo Cedro (CSA #8) and County Service Area #11 French Gulch
(CSA #11) infrastructure, management, services, and boundaries. The report is for use by the
Shasta Local Agency Formation Commission (LAFCO) in conducting a statutorily required MSR
review and SOI update process. The Cortese-Knox-Hertzberg Local Government Reorganization
Act of 2000 (CKH Act) requires that the Commission conduct periodic reviews and SOI updates of
for cities and special districts in Shasta County (Government Code § 56425). State law also requires
that, prior to SOI adoption, LAFCO must conduct a review of the municipal services provided by
that local agency (Government Code §56430). This report provides LAFCO with a tool to study
current and future public service conditions comprehensively and to evaluate organizational
options for accommodating growth, preventing urban sprawl, and ensuring that critical services
are provided efficiently.
CSA Overview
County Service Areas are dependent special districts under County Service Area law
(Government Code §25210-25217.4). They provide, water, sewer and other services to
unincorporated areas. In Shasta County, they are governed by the Board of Supervisors. The Public
County Works Department provides staff support and administers District operations.
Principal Act
The CSA principal act is the County Service Area law (Government Code § 25210-25217.4) which
authorizes CSAs to provide up to 26 types of governmental services within its boundaries. CSA #8
is authorized to provide water and wastewater services. CSA #11 is authorized to provide water
services. Other services, facilities, functions or powers enumerated in the District’s principal act but
not identified in the formation resolution are “latent,” meaning that they are authorized by the
principal act under which the District is formed but are not being exercised. Latent powers and
services activation require LAFCO authorization as indicated in Government Code §25213.5.
Service Review Determinations
Government Code §56430 requires LAFCO to conduct a review of municipal services provided in
the county by region, sub-region or other designated geographic area, as appropriate, for the
service or services to be reviewed, and prepare a written statement of determination with respect
to each of the following topics:
1. Growth and population projections for the affected area;
2. The location and characteristics of any disadvantaged unincorporated communities within
or contiguous to the sphere of influence;
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies (including needs or deficiencies related to sewers,
municipal and industrial water, and structural fire protection in any disadvantaged,
unincorporated communities within or contiguous to the sphere of influence);
4. Financial ability of agencies to provide services;
5. Status of, and opportunities for, shared facilities;
6. Accountability for community service needs, including governmental structure and
operational efficiencies; and
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 4 February 2020
7. Any other matter affecting or related to effective or efficient service delivery, as required by
Commission policy.
This service review provides an overview of County Service Areas along with profiles of each
agency. The report also includes service review determinations and sphere of influence
recommendations for each of the following service areas:
County Service Area #8 – Palo Cedro
County Service Area #11 – French Gulch
State Guidelines and Commission policies encourage stakeholder cooperation in the municipal
service review preparation. It also provides a basis to evaluate, and make changes to the Spheres
of Influence, if appropriate.
Sphere of Influence Determinations
A SOI is a LAFCO-approved boundary that designates an agency’s probable physical service
area. Spheres are planning tools used to provide guidance for individual boundary change
proposals and are intended to encourage efficient provision of organized community services,
discourage urban sprawl and premature conversion of agricultural and open space lands, and
prevent overlapping jurisdictions and duplication of services.
LAFCO is required to establish SOIs for all local agencies and enact policies to promote the logical
and orderly development of areas within the SOIs. Furthermore, LAFCO must update those SOIs
every five years. In updating the SOI, LAFCO is required to conduct a municipal service review
(MSR) and adopt related determinations. In addition, in adopting or amending an SOI, LAFCO
must make the following determinations:
1. The present and planned land uses in the area, including agricultural and open-space
lands;
2. The present and probable need for public facilities and services in the area;
3. The present capacity of public facilities and adequacy of public services that the agency
provides or is authorized to provide;
4. The existence of any social or economic communities of interest in the area if the
Commission determines that they are relevant to the agency; and
5. The present and probable need for public facilities and services related to sewers,
municipal or industrial water, or structural fire protection of any disadvantaged
unincorporated communities in the existing sphere of influence (effective July 1, 2012).
Uses of the Report
This service review provides the opportunity to identify trends relating to the adequacy, capacity,
and cost of providing services in rural areas of Shasta County. Service reviews may identify district
boundary changes, where appropriate, to extend services; evaluate consolidation feasibility,
where appropriate, and implement other measures to address community water and wastewater
service needs. The potential uses of this report are described below.
To Update Spheres of Influence
This MSR serves as the basis for SOI update, to consider territory LAFCO believes represents an
agency’s appropriate future jurisdiction and service area. All boundary changes, such as
annexations, must be consistent with an affected agency’s SOI with limited exceptions.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 5 February 2020
To Consider Jurisdictional Boundary Changes
LAFCO is not required to initiate any boundary changes based on service reviews. However,
LAFCO, other local agencies (including cities, special districts, or the County), or the public may
subsequently use this report together with additional research and analysis, where necessary, to
pursue changes in jurisdictional boundaries.
Resource for Further Studies
Other entities and the public may use this report for further study and analysis of issues relating to
County Service Areas and water service in Shasta County.
Review Methods
The following information was considered in the service review:
o Agency-specific data: responses to LAFCO Requests for Information from Shasta County
Public Works Department, maps, district plans and agency correspondence;
o Land Use and Shasta County General Plan data: Shasta County Resource Management –
Planning Division;
o Demographic data: U.S. Census; Department of Finance; CA Water Resources Board;
o Finances: budgets, rates and fees; and
o Other Reports and Assessments: State Water Resources Control Board citation
Information gathered was analyzed and applied to make the required determinations for each
agency and reach conclusions about the focus issues identified in the service review. All
information gathered for this report is filed by LAFCO for future reference.
California Environmental Quality Act
The California Environmental Quality Act (CEQA) is contained in Public Resources Code §21000 et
seq. Under this law, public agencies are required to evaluate the potential environmental effects
of their actions. MSRs are statutorily exempt from CEQA pursuant to §15262 (feasibility or planning
studies) and categorically exempt pursuant to CEQA Guidelines §15306 (information collection).
It should be noted that when LAFCO acts to update an SOI, CEQA requirements must be satisfied.
The lead agency for CEQA compliance would most likely be LAFCO.
Common Topics for Each Agency Profile
Several topics are evaluated in each agency profile. Those topics are defined in this section and
discussed further in the agency profiles.
Disadvantaged Unincorporated Communities
LAFCO is required to evaluate disadvantaged unincorporated communities (DUCs) as part of its
municipal service review process. Per California Senate Bill 244, a DUC is defined as any area with
12 or more registered voters where the median household income (MHI) is less than 80 percent of
the statewide MHI. Within a DUC, three basic services are evaluated: water, sewer and fire
protection.
The California Department of Water Resources Disadvantaged Communities Mapping Tool uses
US Census Block Groups, Tracts and Places from the US Census American Community Survey (ACS)
5- Year Data: 2012-2016 to map disadvantaged communities. Using this information, each district
or agency is evaluated to determine whether it is a DUC, or in the case of cities, whether there
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 6 February 2020
are DUCs within the city’s SOI. In many cases, Census Block Groups are larger than Districts. In
these cases, LAFCO’s evaluation was conducted with an abundance of caution to ensure no
DUCs are overlooked.
In order to provide a more accurate representation of current conditions, this report utilizes ACS
5-Year Data from 2013 to 2017 matched with DUCs identified by the Disadvantaged Communities
Mapping Tool.
Shasta County Growth Projections
Between 2013 and 2017, the Shasta County population grew from 177,966 to 178,919 people, an
average annual growth rate of 0.12 percent1. When reviewing population data, it is important to
distinguish between population changes that affect the entire County and the unincorporated
portion of the County, which can be affected by annexations and other boundary changes. The
unincorporated area of the County currently makes up about 38% of the County’s total
population. The California Department of Finance projects the County’s population will increase
from 179,412 to 188,154, between 2020 and 2030, an average annual growth rate of 0.49%2. If the
unincorporated area’s portion of the County’s population remains near 38%, it is estimated that
the unincorporated area would increase from 68,177 to 71,499 people.
However, according to the most recent California Department of Finance estimate, the Shasta
County population decreased by 0.1% from 2018 to 20193. This could be the result of the Carr Fire
that consumed 359 square miles around Whiskeytown Reservoir in 2018, and other wildfires to the
east. For report purposes an annual population growth estimate of 0.12% to 0.49% is used to
predict the future population range that may be served by the CSAs during this MSR cycle. It
should also be noted that the Department of Finance, Demographics Division, now states that
assumptions used to project future population may no longer be applicable and that these
projections could change with their next estimate cycle, which is every 5 years.
Existing and Planned Land Uses
Land use within the unincorporated portion of the districts is subject to the Shasta County General
Plan and Zoning Regulations, which was last updated in 2004.
Governance and Accountability
Both CSA #8 and #11 operate as dependent special districts under the Shasta County Board of
Supervisors and operated by County staff. Any decisions regarding the CSAs are made at regular
Board meetings. The Board typically meets on Tuesdays at 9:00am in the Board of Supervisors
Chambers at 1450 Court Street in Redding, CA. Board meeting dates, times, agendas, and
minutes are available online at co.shasta.ca.us. The current Board members are provided below:
1 US Census Bureau, 2013-2017 American Community Survey 5-year Estimates.
2 California Department of Finance, Projections, P-1: State Population Projections (2010-2060), Total Population by County
(1-year increments).
3 California Department of Finance, E-1 Population Estimates for Cities, Counties, and the State – January 1, 2018 and 2019,
May 2019.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 7 February 2020
Shasta County Board of Supervisors
Board Member District Term Start
Joe Chimenti 1- Redding 2019
Leonard Moty 2 - Centerville, French Gulch, Happy Valley, Igo/Ono, Keswick, 2009
Platina, Shasta, South Redding, Verde Vale
Mary Rickert 3 - Bella Vista, Burney, Cassel, Fall River Valley, Montgomery Cr, 2017
Oak Run, Old Station, Palo Cedro, Pittville, Whitmore
Steve Morgan 4 - Castella, Lakehead, Shasta Lake, Mountain Gate 2017
Les Baugh 5 - Anderson, Cottonwood, Millville, Manton, Shingletown, Viola 2007
Governance Structure
As stated above, CSAs #8 and #11 are dependent special districts governed by the Shasta
County Board of Supervisors and managed by the Shasta County Public Works Department. In
addition, CSA #11 has a Community Advisory Board (CAB). These typically consist of seven (7)
members who serve as a liaison between CSA residents and the County.
CABs were established by the County in 1984 pursuant to Resolution No. 84-6 with CAB members
appointed by the County Board of Supervisors for two-year terms. Each year property owners are
invited to nominate CAB candidates for vacant CAB seats. Elections are held if willing candidates
exceed the number of vacant seats. CABs provide for local participation and County
accountability. Affected constituents may provide input directly to County staff or the respective
member of the Board of Supervisors.
Management and Staffing
The County Public Works Department provides administrative support, staffing, and operations for
11 CSAs, including the CSA #8 Palo Cedro water and sewer system and CSA #11 French Gulch
water system. The Department has one operation supervisor, one lead water/wastewater
operator, two licensed water treatment plant operators, and four extra help employees. The
Department is responsible for maintaining, upgrading, or replacing equipment. They also manage
budgets, suggest service rates and assure compliance with all laws relating to quality, health, and
safety. The Department manages funds for CSA capital improvement projects, bond assessments,
and debt service, and administers billing of CSA customers.
AGENCY PROFILES
This section profiles the County Service Areas listed below. Included in each profile is a description
of each agency’s organizational development, tables listing key service information, and maps
showing jurisdictional boundaries.
CSA #8 – Palo Cedro
CSA #11 – French Gulch
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 8 February 2020
CSA #8 – Palo Cedro
Palo Cedro, located approximately eight miles east of Redding, is an early Shasta County
community, formed initially as a 30-acre town site. The area has featured fruit, livestock, and other
agricultural enterprises for many years, with local business supporting community needs.
The first public service need identified by the community, fire protection, resulted in the decision
to request formation of the Palo Cedro Area Community Services District in 1967. It was approved
and authorized to provide fire protection services to over 14,800 acres and noted the future need
for water and sewer services within its boundary. This District remained in operation until 1972.
When County Service Area #1 – Shasta County Fire Department was first formed and took over
management of the CSD’s volunteer fire company and its facilities. Since the CSD was no longer
active, CSA #8 was eventually formed to provide sewer, and later water, service to the area.
Table 1: CSA #8 Overview Summary
Primary Contact Shawn Ankeny, Supervising Engineer, Shasta County Public Works Dept
Address: 1855 Placer Street Redding, CA 96001
Website www.co.shasta.ca.us
Services Provided Water & Wastewater (County Management: Troy Bartolemei)
Population Served: ~ 405 Service Area: ~ 1.1 sq. mi.
Service Connections (water/sewer) 78/163
Formation
CSA #8, organized as a dependent special district (Government Code §25210-25217.4), provides
domestic water service and sewer service to the unincorporated community of Palo Cedro
located approximately eight miles east of the City of Redding along Little Cow Creek.
In 1980, County Service Area #8 – Palo Cedro was formed to upgrade individual septic systems to
a community sewer system. Initially, the CSA covered 270 acres which were generally located in
the downtown area of Palo Cedro. Funding was subsequently obtained to construct a
conventional gravity collection system in the commercial area with a lift station near Junction
School to carry raw sewage to an aerated-cell treatment system and land-application disposal
facilities located in the Stillwater Plains area.
Additional areas were identified for sewer service during the 1984 sphere of influence study. Prior
to initiating water services to Palo Cedro, commercial and residential development within CSA #8
relied on either private wells or services from the Bella Vista Water District. In 1984, Shasta LAFCO
assigned approximately 3,600 acres and all of Palo Cedro to the Bella Vista Water District SOI
because CSA #8 did not provide water service at that time. In late 1988, the Palo Cedro Golf
Estates subdivision approval was conditioned upon receiving both sewer and water services and
the subdivider subsequently approached CSA #8 about providing both services. The subdivision
was completed in 1990 with all water system improvements in place and annexed into CSA #8.
In 1995, water service was extended to 29 more parcels. Although these were technically within
the Bella Vista Water District SOI at the time, Bella Vista Water District was not able to provide
services to the area due to drought conditions and limitations on water allocations. Today, the
CSA has grown from its initial 270 acres to almost 700 acres in size. Not all areas covered by the
sewer zone receive water. The last CSA #8 SOI update occurred in 1983.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 9 February 2020
County Service Area Boundary and Sphere
The CSA boundary encompasses approximately 706.3 acres and the SOI is coterminous. Sewer
service is offered throughout the CSA, but water service is only offered to approximately 137.2
acres within the CSA boundary, covering areas around Calistoga Way and Golftime Drive. See
Figure 1: CSA Boundary and Sphere. The CSA serves a population of about 405 with approximately
78 active connections. An MSR was previously conducted in 2014.
Other Service Providers
Shasta County Sheriff’s Office provides police services and CSA #1 Shasta County Fire provides
fire protection services to CSA #8. There is a Bella Vista Water District (BVWD) emergency water
intertie with CSA #8. There is an existing agreement between BVWD and CSA #8, which outlines
the process and circumstances for intertie activation. The intertie activation must be requested.
Pursuant to the agreement, Palo Cedro is directed to request the intertie be opened. During after
hours, there is an on-call operator to open the intertie. During working hours, it takes approximately
30 minutes to activate the intertie and approximately an hour during after hour operations.
Customers are not automatically notified, however, there is an answering service which patches
customers through to the on-call operators.
The existing intertie agreement has not been updated for some time. An update is recommended,
to correct any deficiencies and provide for current capacity and infrastructure limitations.
BVWD does not currently have sufficient Central Valley Water Project (CVWP) water allocations
to serve CSA #8. Any proposed annexation of CSA #8 customers or consolidation with BVWD
would require CVWP Board approval and would also trigger National Environmental Protection
Act (NEPA) compliance due to federal water regulations. BVWD is also subject to strict regulations
and water restrictions in drought years which may limit their ability to take on new customers.
Existing and Planned Land Uses
Land Use
Land uses in the CSA include Commercial (C), Rural Residential A (RA), Suburban Residential (SR),
and Planned Development (PD). Schools are designated either RA or SR. Outside of the CSA
boundary, land use is primarily Rural Residential, which generally allows for one dwelling unit per
10 acres. Palo Cedro is designated as a “Town Center” in the Shasta County General Plan.
General Plan policy CO-r states: “The County should develop specific plans for the …, and Palo
Cedro areas.” See Figure 2: CSA Land Uses
Zoning
Zoning in the CSA is primarily Community Commercial (C-2) and Planned Development (PD).
Other zoning districts include Public Facility (PF), Rural Residential (R-R), Rural Residential Building
Site Sac Lots(R-R-BA-S), Designated Floodway (F-1), Office Commercial-Design Review (C-O-DR),
Commercial-light industrial-Design Review (C-M-DR), Community Commercial Design Review (C-
2-DR),. Surrounding zone districts include various Rural Residential and Limited Residential.
Growth and Population
According to the 2018 ACS 5-year estimate, the Palo Cedro Census Designated Place (CDP) has
a population of 1,1514. This is a decrease from the 2014 population estimate of 1,626. Additionally,
the Palo Cedro CDP boundary is larger than that of the CSA. It is likely that the population estimate
is larger than the actual CSA population.
4ACS 2018 5-year Estimate, Population, Table S0101 for Palo Cedro, California.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 10 February 2020
Figure 1: CSA Boundary and Sphere
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 11 February 2020
Figure 2: CSA Land Uses
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 12 February 2020
Using the ACS 5-year estimate and the population growth range for unincorporated Shasta
County (0.12 to 0.49 percent), the projected population for the Palo Cedro area in 2024 is 1,157
to 1,179. Since the CSA boundary is smaller than the Palo Cedro census boundary. It is likely that
actual population growth in the CSA, if any, will be smaller.
There is an island of land (substantially surrounded) at approximately 8.3 acres, which is not part
of CSA #8 located along Old 44 Drive in the northern portion of CSA #8 southeast of Vine Court.
Disadvantaged Unincorporated Communities
Palo Cedro is a Census Designated Place and according to the 2018 ACS 5-year estimate, it has
a MHI of $83,1485. This is over the reported California MHI of $71,228. This is an increase from the
2014 ACS 5-year estimate of $81,000. Since the MHI is above the California MHI, Palo Cedro is not
considered a DUC.
Municipal Services
CSA #8 offers wastewater services within its boundary and water services to a small portion of the
district along Calistoga Way and Golftime Drive. CSA #8 maintains 78 water service connections
and 163 wastewater connections.
Water Source
CSA #8 is served by one well drilled in 1990 to 137-feet below ground surface (bgs). The well is
located approximately 400 feet east of Cow Creek and 40 feet from Highway 446. There is a BVWD
water service intertie for emergency use under certain circumstances described in the agreement
with CSA #8. In the event of a power outage, CSA #8 does not have onsite backup generators
for pumping water to customers. The County has portable backup power generator to power the
well motor and has rented generators in the past to maintain water service during power outages.
There are 79 active connections, serving a population of approximately 261, which includes 78
single-family residences and a golf course. There is one 5,000-gallon steel pressure tank. The golf
course has its own dedicated water well used for irrigation only. It was drilled in 1990 to a depth of
380 feet bgs and is located on the west side of maintenance shop roughly 60 feet from Silverbridge
Road. The irrigation well has no physical connection to the CSA domestic/drinking water supply.
Water Present Capacity
The water system distributes approximately 25,000 gallons per day (gpd) in winter and 170,000 gpd
in summer months. The well produces about 700-750 gallons per minute (gpm), with numerous
daily pump cycles due to no storage tanks other than the 5,000-gal pressure tank noted above.
A higher number of cycles may require pump replacement every 3-4 years. A new pump was
installed in the summer of 20157.
Water Treatment, Storage, and Distribution
Well water is treated with sodium hypochlorite (12.5%) for bacteria prevention, by a chlorinator
installed in November 2002. Chlorination is provided by a Premia 75 solenoid metering pump with
a maximum 1.83 gph output. A chlorine solution is pumped into the 6-inch diameter galvanized
steel pipe at the well head prior to the pressure tank. A disinfection data sheet is completed and
submitted for review each month and shows a typical residual of about 0.20 ppm to 0.40 ppm in
the distribution system8.
5ACS 2018 MHI 5-year Estimate, Table S1903 for Palo Cedro CDP, California.
6 Shasta County Department of Resource Management-Small Water System Inspection Report 2017
7 Shasta County Inspection Report, 2017.
8 Shasta County Inspection Report, 2017.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 13 February 2020
There is one 5,000-gallon horizontal galvanized steel pressure tank located near the well head
which is equipped with an air compressor, generator, and pressure gauge. A tank pressure switch
is preset to turn on the well pump at 54 psi and turn the well pump off at 75 psi.
The primary distribution system consists of 7,218 feet of 8-inch diameter pvc main pipe, with 11 six-
inch diameter fire hydrant valves. The main terminates near Silverbridge Road at the golf club
house and Cedro Lane at Calistoga Way. A distribution system map can be found in the permit
file or at the Shasta County Public Works office. The operating pressure in the distribution system
has been measured in the range of 35 psi - 45 psi during previous inspections9. The system
operations plan includes valve flushing schedules and what actions would be taken when water
mains break or if there is a pressure loss below 5 psi.
Water System Monitoring
CSA #8 is required to routinely monitor for drinking water contaminants and water turbidity. Annual
Consumer Confidence Reports (CCR) shows drinking water monitoring results for the January 1 to
December 31 period. The most recent CCR (2018) was sent to customers and posted on the Shasta
County website. It reports no Palo Cedro system violations of maximum contaminant levels or
other water quality standards exceedances during the monitoring period.
Wastewater
CSA #8 currently provides wastewater services to approximately 163 connections representing
465 household equivalents (HEs) with a maximum capacity of 585 HEs. There are 132 residential
connections and 31 commercial connections10. Wastewater is collected from residences and
transferred to a treatment facility approximately 2.5 miles southwest of the CSA boundary.
The treatment facility was originally built in 1986 and was most recently upgraded in 1999. It consists
of a headworks with static screen, two aeration basins, and three storage reservoirs. Wastewater
is pumped to the facility where it passes through the screen and then flows to one of the two
aeration basins. Aerated water then flows by gravity to the three storage basins before being
used to irrigate onsite landscaping during the summer months11.
The treatment facility is subject to Waste Discharge Requirements (WDRs) set by the Central Valley
Regional Water Quality Control Board. The WDRs provide a detailed overview of the system and
sets requirements for various items such as storage capacity, inflow limitations, pH levels, sludge
removal, and land applications.
Present Wastewater Capacity
2016-17 precipitation was very close to a 100-year rainfall year. During early spring 2017, all WWTP
ponds were near capacity, volume-wise. To re-create the 2016-17 condition, a hydraulic balance
was performed using actual wastewater flows and rainfall amounts received. Analysis indicates
the existing treatment and disposal facilities can likely handle an additional 129 HEs if operations
continue as usual. The County is aware of system limitations for accommodating new growth,
and hired PACE Engineering to prepare a technical memorandum discussing treatment plant
expansion options. This Memorandum is available in the appendices.
Wastewater Storage
The WWTP has 3 ponds with a combined storage capacity of 40.7 MG (125.0 ac-ft).
Wastewater Infrastructure: Analysis and Recommendations
Current treatment Infrastructure consists of a headworks, aeration basins, and storage reservoirs.
Wastewater gravity flows from the storage basins and is used for irrigation. The wastewater
9 Shasta County Inspection Report, 2017.
10 Technical Memorandum, Pace Engineering, December 4, 2018.
11 Technical Memorandum, Pace Engineering, December 4, 2018.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 14 February 2020
collection, treatment and disposal infrastructure is operating within capacity. The capacity
expansion analyzed in the PACE Engineering Technical Memo, in anticipation of future growth
and system upgrades, is not necessary at this time.
Shared Facilities
The closest agency providing a similar sanitary sewer system would be the City of Redding, about
3.4 miles east of CSA #8. Given the distance, terrain, a need for force main installation, transmission
costs and increased City system capacity, it is unlikely that more efficiency would be achieved by
sharing services with the City of Redding.
Financial Overview
The CSA is primarily funded through water service collection fees and sewer charges; other
funding sources include interest and an assessment. The major expenses are professional
maintenance and monitoring services. See Table 3.
Table 2: CSA #8 Financial Summary
Adopted Actual Adopted Actual Adopted
Categories
FY17-18 FY17-18 FY18-19 FY18-19 FY19-20
Revenue
Water Collections $ 31,000.00 $32,242.48 $ 31,000.00 $42,315.37 $60,000.00
Sewer Charges $ 123,000.00 $124,475.39 $ 123,000.00 $147,137.84 $200,000.00
Connection Fees $ - $ - $ - $ 8,750.00 $ -
Tran in CSA #8 $ - $ - $150,000.00 $135,000.00 $ -
Interest $1,000.00 $ - $1,000.00 $964.73 $400.00
S/A Sewer Asmt Curr. $ - $381.49 $ - $141.98 $ -
Miscellaneous Sales $ - $ - $ - $28.80 $ -
Total Revenue $155,000.00 $157,099.36 $305,000.00 $334,338.72 $260,400.00
Expenses
Communications Exp $3,000.00 $2,876.98 $3,000.00 $2,959.04 $3,500.00
Insur XP Miscel. $769.00 $768.96 $577.00 $576.96 $540.00
Equipment Maint. $25,000.00 $2,792.33 $7,000.00 $10,528.79 $10,000.00
IT Maint. Hard/Soft. $ - $36.54 $ - $41.14 $37.00
Facils. Manage/Maint $803.00 $900.00 $50,800.00 $39,850.83 $1,000.00
Med/Dentl Lab Supps. $1,000.00 $494.60 $500.00 $ - $500.00
Memberships $200.00 $155.60 $200.00 $150.00 $200.00
OC Postage Service $1,056.00 $1,003.93 $148.00 $1,187.97 $1,581.00
Professional/Spec.
Servs $20,000.00 $5,030.19 $20,000.00 $55,588.67 $25,000.00
Professional Lab Servs $5,000.00 $6,364.50 $ 5,000.00 $5,246.50 $5,000.00
Professional Maint. $50,000.00 $53,475.31 $60,000.00 $36,339.19 $60,000.00
Professional
Monitoring Servs $100,000.00 $105,075.96 $115,000.00 $94,595.21 $125,000.00
IT Services $3,444.00 $1,413.98 $1,158.00 $1,058.55 $1,162.00
Publications & Notices $ - $ - $ - $124.00 $ -
Minor Equipment $3,000.00 $1,827.28 $3,000.00 $826.80 $2,000.00
Special Dept Expense $25,000.00 $17,746.72 $25,000.00 $20,303.25 $25,000.00
Transportation Travel $3,000.00 $3,907.71 $3,000.00 $3,881.97 $3,000.00
Utilities $50,000.00 $49,349.77 $60,000.00 $53,803.96 $60,000.00
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 15 February 2020
Adopted Actual Adopted Actual Adopted
Categories
FY17-18 FY17-18 FY18-19 FY18-19 FY19-20
Central Service Cost
Plan Change $2,502.00 $2,502.00 $7,517.00 $7,517.16 $5,131.00
Interest $1,000.00 $1,461.82 $1,000.00 $964.73 $400.00
Total Expenses $294,774.00 $257,184.18 $362,900.00 $335,544.72 $329,051.00
Net Total ($139,774.00) ($100,084.82) $(57,900.00) $(1,206.00) $(68,651.00)
Service Rates
The CSA #8 charges a base rate per customer that includes the first 12,000 gallons (1,604 cf).
Above that, customers are charged a rate per 1,000 gallons. The table below shows the rate
increase schedule through November 2021.
Table 3: CSA#8 Water Use Fees
Charge Type Rate as of 11-1-19 Rate as of 11-1-20 Rate as of 11-1-21
Base Rate includes 12,000 gal $78 $100 $122
Per 1,000 gal above Base Rate $0.60 $0.65 $0.70
Installation: When main line extensions are required, they shall be constructed at the sole expense
of the person or entity to be served and shall meet or exceed minimum County standards and
requirements. An improvement plan check and construction inspection deposit is required. The
minimum deposit is $1,500. Once actual costs, including personnel and materials, of plan checking
and construction inspection are determined, a fee to cover those costs is imposed and the
deposit applied to the fee.
When a main line extension is not required, County personnel will install the meter on an existing
service pipe in an existing box based on the following fees to be paid prior to installation: 3/4”
meter fee of $210; any other size meter fee of $300.
When a service line and box must be installed on an existing main, County personnel will install the
meter based on the following fee to be paid prior to installation: $3,400.00 deposit, plus actual
costs including personnel and materials.
Wastewater Connection Fees: Owners of structures that did not have operating on-site sewage
disposal systems on or before February 4, 1984, shall pay a Connection Fee of $14,922 per
household equivalent prior to connection to the sewage disposal system. Owners of structures
that did have operating on-site sewage disposal systems on or before February 4, 1984, shall also
pay a $14,922 per HE Connection Fee in excess of that which was in use in that place on the said
date prior to connection to the sewage disposal system.
Commencing January 1, 2020, and annually thereafter, the amount of the Fee shall be
automatically adjusted by a percentage equal to the percentage change in the Engineering
New Records' construction cost index from the index for January of the preceding year to index
for the January of the adjustment year. Connection Fees shall be deposited into the CSA # 8-Palo
Cedro Sewer Capital Improvement Admin fund for future expansion of the system.
Restoration of Service-Vacation:
A $40 fee shall be charged for conversion to vacation status. Water service will be restored to
regular status upon request from the customer and will be turned on no later than the next business
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 16 February 2020
day. A fee of $40 shall be charged for the conversion to regular status. If the customer requests
restoration of service that requires an otherwise unscheduled trip, a $100 fee shall be imposed.
Capital Improvement Fees:
For new land uses that will generate wastewater in excess of the wastewater quantities used to
establish Palo Cedro Assessment District No. 1982-1, the property owner shall pay a Capital
Improvement Fee of $3,650 for each additional household equivalent based on the proposed
zoning or use.
Wastewater Inspection Fees:
A sewer inspection fee of $150 will be collected at building permit issuance where connection to
the sewer system is a requirement of the building permit.
Financial Constraints and Opportunities
Shasta County has recently been upgraded from an A1 bond rating to Aa312, signifying that the
risk of default is low. An Aa3 bond rating is one of the top ratings assigned by Moody’s, a bond
credit rating agency. The basis for a bond rating is like an individual’s credit report. It evaluates
the bond issuer’s ability to make payments to bondholders. It assists creditors with their decision to
extend credit. Considering CSA #8 has experienced a deficit since the beginning of the 2018
Financial Year, Staff recommends seeking other funding mechanisms to increase the reserve.
Cost Avoidance Opportunities
Regular system consumption monitoring, infrastructure condition inspections, and scheduled
replacement and upgrades are effective cost avoidance measures. The County monitors the
system with meter records and conducts periodic inspections.
Staff has considered switching from bi-monthly direct billing for service to establishing an annual
service charge for each parcel payable via the annual tax bill as a means of reducing
delinquencies and billing expenses.
Accountability and Governance
As noted earlier, CSA #8 is governed by the County Board of Supervisors. Meetings are held on
Tuesday’s at 9:00 am in the Board Chambers at 1450 Court Street in Redding13. The CSA currently
does not have an advisory board nor a website where information about the CSA can be
accessed. It would be beneficial to the CSA to set up a basic website to post information about
rates for services, water quality, and Board actions concerning the CSA. CCR’s for the CSA are
posted online at: https://www.co.shasta.ca.us/index/pw_index/operations/csas.aspx.
Budgets are approved annually by the BOS which then establishes the scope of work and
improvements that can be performed. The BOS, as the district board of directors, authorizes and
approves any contracts used to construct improvements or perform maintenance work, or to
conduct studies, designs, or engineered changes to the water system. The Board communicates
directly with the Director of Public Works and/or department staff during weekly Board meetings
or through written communications.
12 Moody’s Investors Service: https://www.moodys.com/research/Moodys-Upgrades-to-Aa3-from-A1-Shasta-County-CAs-2013A--
PR_903622926?WT.mc_id=AM%7eRmluYW56ZW4ubmV0X1JTQl9SYXRpbmdzX05ld3NfTm9fVHJhbnNsYXRpb25z%7e20160930_P R_903622926
13 Dates of scheduled meetings can be found online at https://www.co.shasta.ca.us/docs/libraries/bos-docs/bos-
meetings/bos-meetings-calendar-2020.pdf.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 17 February 2020
Municipal Service Review Determinations
(1) Growth and population projections for the affected area
a) The projected 2024 Palo Cedro area population is 1,261 to 1,284. Since the CSA
boundary is smaller than the census boundary, it is likely that actual population growth
in the CSA, if any, will be smaller.
b) There is an island of land at approximately 8.3 acres, located along Old 44 Drive,
southeast of Vine Court, not in CSA #8 that is also not within the SOI.
(2) The location and characteristics of any disadvantaged unincorporated communities within or
contiguous to the sphere of influence
a. Palo Cedro is a Census Designated Place and according to the 2018 ACS 5-year
estimate, it has a MHI of $83,148. This is above the reported California MHI and
therefore, Palo Cedro is not considered a DUC.
(3) Present and planned capacity of public facilities and adequacy of public services, including
infrastructure needs or deficiencies
a) The present and planned facilities are in good condition and capable of supplying
growth. There is an additional 129 HE capacity currently.
b) The 2018 CCR reports that the Palo Cedro system did not violate a maximum
contaminant level or any other water quality standard during the monitoring period.
c) The wastewater facility equipment requires regular maintenance, including items for
repair and/or replacement as noted in this MSR and the December 4, 2018 PACE
Technical Memorandum.
(4) Financial ability of agencies to provide services
a) Considering CSA #8 has experienced budget deficits, additional funding mechanisms
to increase revenues are recommended. County staff has considered switching from
bi-monthly direct billing for sewer service to establishing an annual service charge for
each parcel payable via the annual tax bill as a means of reducing delinquencies and
billing expenses.
b) The County is currently implementing a 5-year rate increase to aid budget deficits;
however, additional funding mechanisms may be needed to fund future upgrades.
(5) Status of and, opportunities for, shared facilities
a) There is a BVWD water line intertie that provides emergency backup water services
when the Palo Cedro well pump is not operating and water is unavailable, there is a
limited period between water system operator notification and intertie activation;
during power outages BVWD may not be able to operate the intertie. The County
operates multiple CSAs and has shared operations and management practices in
place for efficient collective operations.
(6) Accountability for community service needs, including governmental structure and
operational efficiencies
a) The CSA is governed by the Shasta County Board of Supervisors. There is no advisory
board for CSA #8. The CSA demonstrated accountability and transparency by
disclosing financial and service-related information in response to LAFCO requests.
(7) Any other matter related to effective or efficient service delivery.
a) None beyond those noted above.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 18 February 2020
Sphere of Influence Determinations
In order to carry out its purposes and responsibilities for planning and shaping the logical and
orderly development of local governmental agencies, to advantageously provide for the present
and future needs of the county and its communities, the commission shall develop and determine
the sphere of influence, as defined by Government Code §56036, and enact policies designed
to promote the logical and orderly development of areas within the sphere. In determining the
sphere of influence of each local agency, the commission shall consider and prepare a written
statement of its determinations with respect to the following:
(1) Present and planned land uses in the area, including agricultural and open-space lands.
a) Outside of the CSA boundary, land use is primarily Rural Residential, which generally allows
for one dwelling unit per 10 acres. Rural Residential parcels of this size typically have onsite
water and wastewater systems and not receive services from the CSA.
(2) Present and probable need for public facilities and services in the area.
a) Given the Rural Residential land use designation surrounding the district, here does not
appear to be a probable need for services outside district boundaries, or a SOI expansion
at this time.
(3) Present capacity of public facilities and adequacy of public services that the agency provides
or is authorized to provide.
a) The water system distributes approximately 25,000 gallons per day (gpd) in winter and
170,000 gpd in summer months. The well produces about 700-750 gallons per minute
(gpm), with numerous daily pump cycles due to no storage tanks other than the 5,000-gal
pressure tank noted above. A higher number of cycles may require pump replacement
every 3-4 years. A new pump was installed in the summer of 2015.
b) The WWTP flow analysis discussed in this MSR indicates the existing treatment and disposal
facilities can likely handle an additional 129 HEs if operations continue as usual.
(4) Existence of any social or economic communities of interest in the area if the commission
determines that they are relevant to the agency.
a) There are no social or economic communities of interest in the immediate area
surrounding the service area, where services could be feasibly extended.
(5) For an update of a sphere of influence of a city or special district that provides public facilities
or services related to sewers, municipal and industrial water, or structural fire protection, the
present and probable need for those public facilities and services of any disadvantaged
unincorporated communities within the existing sphere.
a) Palo Cedro is a Census Designated Place and according to the 2018 ACS 5-year estimate,
it has a MHI of $83,148. This is above the reported California MHI and therefore, Palo Cedro
is not considered a DUC.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 19 February 2020
CSA #11 – French Gulch
French Gulch is a historic mining town located 12 miles west of Redding, California on State Route
299. The town was settled by French gold miners in 1849. It is listed in the national Register of Historic
Places as a historic district. The district consists of 1,800 acres and 9 buildings, including the French
Gulch Hotel, Franck's Store, and the odd Fellows Hall. In its mining heyday, French Gulch had four
saloons, two hotels, two mercantile shops, an assayer’s office, livery stables, blacksmith shops, and
a post office. It was one of California's famous gold mining districts. The Washington Mine was the
first quartz mine worked in Shasta County. From 1900 to 1914, approximately $300,000-$500,000 of
gold was mined each year.
Table 4: CSA #11 Overview Summary
Primary Contact Shawn Ankeny Supervising Engineer Shasta County Public Works Dept
Address: 1855 Placer Street Redding, CA 96001
Website www.co.shasta.ca.us
Services Provided Water (County Management: Troy Bartolemei)
Population Served: ~205 Service Area: 544 acres (~.85 sq. mi.)
Service Connections (water) 82
Overview and Formation
CSA #11 is organized as a dependent special district under County Service Area law (Government
Code §25210-25217.4) and was formed in 1992. CSA #11 provides domestic water service to the
unincorporated community of French Gulch located in western Shasta County approximately 12
miles west of Redding, on the west side of the Sacramento River. The CSA serves a population of
about 474 with approximately 82 active connections. An MSR was previously conducted in 2014.
This document updates the previous MSR.
District Boundary and Sphere
The District boundary encompasses approximately 544 acres and the SOI is coterminous. See
Figure 3: District Boundary and Sphere. County Staff has provided a figure showing a continuous
boundary, which includes combining the two northern pieces of land within the French Gulch
boundary to the remainder of the boundary in the south, as shown on the most current LAFCo
Figure. LAFCo accepts the County Figure as part of the MSR.
Other Service Providers
Shasta County Public Works Department provides recreational services in CSA #11 at the French
Gulch Park. Shasta County Sheriff’s Office provides police services and CSA #1 Shasta County Fire
provides fire protection services to CSA #11. The CSA is entirely served by onsite septic and does
not include wastewater services.
Existing and Planned Land Uses
Land Use
Land Use designations within the CSA is primarily Rural Residential B (RB). Other Land Use
designations include Rural Residential A (RA), Habitat Resource (N-H-40), and Public Land (PUB) in
the surrounding area.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 20 February 2020
Figure 3: Updated CSA #11 Boundary
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 21 February 2020
Zoning
Zoning in the CSA is primarily Limited Residential (R-L-T) and Mobile Home Park (MHP). Other zoning
districts include Open Space (OS), Habitat Protection (HP40), Residential-Building Site (R-R-BSM),
Mixed-Use (MU), and Public Facility (PF). Surrounding zone districts include unclassified (U) and
Habitat Protection (HP-40). French Gulch is designated as a “Rural Community Center” in the
Shasta County General Plan.
Growth and Population
French Gulch has an estimated population of 277 (Shasta County Public Works). Using this estimate
and the unincorporated Shasta County population growth range (0.12 to 0.49 percent), the
projected 2024 French Gulch area population would be 310 to 412. The County has reported that
the population was not affected by the 2018 Carr Fire.
Disadvantaged Unincorporated Communities
French Gulch is a Census Designated Place and according to the 2018 ACS 5-year estimate, it has
a MHI of $42,91714. This is 60% of the reported California MHI of $71,228. This is a decrease from
the 2014 ACS 5-year estimate of $28,750, but it is still well below the California MHI. As such, French
Gulch is considered a DUC.
Municipal Services
CSA #11 provides water services to 82 service connections.
Water Source
The water supply is drawn from Clear Creek, diverted to a treatment plant and then delivered to
customers. The system operates under a Shasta County Department of Resource Management
Environmental Health Division permit.
Clear Creek surface water is conveyed to the treatment plant via a man-made ditch. There it is
treated with polymer coagulant, aluminum sulfate, and chlorine prior to contact clarification and
filtration through two Roberts Filter Company-Pacer II units15. The treatment plant has continuous
monitoring equipment for effluent turbidity and chlorine residual. Treated water is stored in a
350,000-gallon steel storage tank prior to distribution16.
Present Capacity
According to a CSA #11 public water system survey, conducted by the State Water Resources
Control Board on October 16, 2015, the system is operating at a production rate between 104 and
111 gpm using one clarification/filtration unit. Based on specifications provided for the Roberts
Pacer II contact clarification/filtration unit (clarifier and filter bed areas, 10 ft2 and 20 ft2) and an
allowable loading rate developed from Alternative Demonstration Studies (10 gpm/ft3 and 5
gpm/ft3), the maximum allowable loading rate is 100 gpm for each unit. System control settings
are checked, and flow rates adjusted, to ensure adequate treatment.
Water Treatment, Storage, and Distribution
Diverted Clear Creek surface water originates north of French Gulch between Trinity Lake and
Interstate 5. Recreation occurs mainly downstream of the treatment plant, but limited swimming
and boating do occur upstream of the surface water diversion. There is also a community park
next to the water treatment plant on the downstream side. The diversion ditch is located right next
to the park and treatment plant driveway. This is an open channel and therefore vulnerable to
spills, or contaminants that may be entrained in storm water. No source water constituents of
14ACS MHI 5-year Estimate (2013-2018), Table B19013 for French Gulch CDP, California.
15 California Water Board-Division of Drinking Water Division: Water Sanitary Survey.
16 California Water Board-Division of Drinking Water Division: Water Sanitary Survey.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 22 February 2020
concern were identified (December 2002 - Source Water Assessment), but it was determined that
the source water is most vulnerable to historic waste site releases and low-density septic systems.
Raw water from the channel flows through a screen and is conveyed to the treatment plant in an
underground 8-inch PVC pipe. Alum, in addition to a polymer coagulant, and chlorine disinfectant
are injected into the raw water prior to filtration. The CSA uses a Roberts Pacer II filter which is an
alternative filtration technology that has been approved by the Division of Drinking Water. The
Roberts filter consists of an upflow absorption clarifier and a multimedia (silica gravel, garnet sand,
and anthracite) gravity filter. Water is first treated in the clarifier portion of the unit. The clarifier
loading capacity is 10 gpm/ft2. Following the clarifier water passes through the multi-media filter
bed. The media is progressively finer through the filter column and has an approved loading rate
of 5 gpm/ft2 The Division of Drinking Water has approved specific loading rates for alternative
technology based on filtration demonstration studies. After clarification and filtration, the treated
water is stored in a 350,000-gallon steel storage tank prior to distribution.
Storage
The maximum day demand (MDD) is estimated to be 191,000 gallons, based on information from
201217. California Code of Regulations §64554 requires that for "systems with less than 1,000 service
connections, the system shall have storage capacity equal to or greater than MDD, unless the
system can demonstrate that it has an additional source of supply or has an emergency source
connection that can meet the MDD requirements”. CSA #11 has a 350,000-gallon water tank
which more than satisfies the maximum MDD.
System Monitoring
CSA #11 is required to routinely monitor for drinking water contaminants and water turbidity. A
Consumer Confidence Report (CCR), sent annually to customers and posted on the Shasta
County website, provides drinking water monitoring results. There was a disinfection byproducts
violation most likely related to increased pre-chlorination due to runoff through the CARR Fire burn
scar affecting raw water quality. The County completed a post chlorination project at Water
Treatment Plant to address the problem18.
Infrastructure: Analysis and Recommendations
Most of the distribution pipeline is PVC installed in 1993. A very small portion was installed in 1996.
PVC pipe typically has a 100-year plus service life19. Based on the time of installation and material,
the pipes should be in good condition.
Shared Facilities
The closest public water system is a small system operated by the National Park Service at
Whiskeytown National Recreation Area (NRA). It would not be cost-effective to lay pipe more
than four miles to link the systems, nor is the Park Service likely to agree to provide service to a
community not within the NRA. The next closest system is Shasta Community Services District, more
than ten miles distant. It is unlikely that more efficiency would be achieved by sharing services with
the Shasta Community Services District. The County operates multiple CSAs and has shared
operations and management practices in place for efficient collective operations.
17 California Water Board-Division of Drinking Water Division: Water Sanitary Survey.
18 2018 Consumer Confidence Report.
19 Sustainable Solutions Corporation, Life Cycle Assessment of PVC Water and Sewer Pipe and Comparative Sustainability Analysis of Pipe
Materials, April 2017.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 23 February 2020
Financial Overview
The CSA is primarily funded through water service collection fees. Expenses include professional
maintenance services, utilities, and equipment maintenance as shown in Table 6.
Table 5: CSA #11 Revenues and Expenditures
Adopted Actual Adopted Actual
Category FY18-19 FY18-19 FY19-20 FY19-20
Revenue
Water Service Collections $85,000.00 $86,121.40 $87,000.00 $34,784.95
Interest $500.00 $2,238.23 $ - $139.15
S/A Del Water Curr. $1,000.00 $1,541.35 $1,500.00 $(37.16)
Total Revenue $86,500.00 $89,900.98 $88,500.00 $34,886.94
Expenses
Communications Expense $250.00 $234.53 $260.00 $80.48
Insurance XP Miscellaneous $58.00 $57.96 $60.00 $25.00
Maintenance of Equipment $10,000.00 $7,631.47 $10,000.00 $1,630.17
Memberships $200.00 $150.00 $200.00 $ -
Charges OC Postage Service $1,062.00 $626.41 $768.00 $269.46
Professional Lab Services $4,000.00 $3,805.00 $5,000.00 $1,487.50
Professional Maintenance Services $45,000.00 $46,768.72 $50,000.00 $6,571.33
Professional and Special Services $10,000.00 $3,703.59 $10,000.00 $1,148.86
Special Departmental Expense $4,000.00 $2,352.25 $1,000.00 $ -
Utilities $12,000.00 $11,933.11 $12,000.00 $3,751.37
Central Service Cost Plan Change $3,139.00 $3,138.72 $4,027.00 $1,677.90
Total Expenses $89,709.00 $80,401.76 $93,315.00 $16,642.07
Net Gain (Loss) ($ 3209.00) $9,499.22 ($4,815.00) $18,244.87
Service Rates
The CSA #11 different rates depending on location for water services. In Table 8, the reference to
the amount of $33,000 includes the entire mobile home park. The base and use rates are as follows
and billed every two months:
Table 6: Residential In-Service Area Rate Schedule - Effective December 1, 2013
Charge Type Amount Applies to:
Basic $79.35 The first 12,000 gallons of water consumed (0-1,604 cf)
Use Charge 1 $0.53/100 gallons (12,000-34,000 gallons)
Use Charge 2 $0.30/100 gallons (>34,000 gallons)
Table 7: Mobile Home Park In-Service Area Rate Schedule - Effective December 1, 2013
Charge Type Amount Applies to:
Base Charge $3,372.50 (0-510,000 gallons)
Use Charge 1 $0.53/100 gallons (510,000-1,453,800 gallons)
Use Charge 2 $0.30/100 gallons (> 1,453,800 gallons)
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 24 February 2020
New Service Installation: Main line extension installations shall be at the sole expense of the person
or entity applying. When a main line extension is not required, County personnel will install the
meter on an existing service pipe in an existing box based on the following fees to be paid prior
to installation: 3/4” meter fee of $210; all other meter sizes fee of $300.
When a service line and box must be installed on an existing main, County personnel will install the
meter based on the following fee to be paid prior to installation: $3,400 deposit, plus actual costs
including personnel and materials.
When main line extensions are required, they shall be constructed at the sole expense of the
person or entity applying for the extension and shall meet or exceed County minimum standards
and requirements. A deposit to cover the improvement plan check and construction inspection
will be required. The minimum deposit shall be $1,500. Once the actual costs, including personnel
and materials, of plan checking and construction inspection are determined, a fee to cover those
costs shall be imposed and the deposit shall be applied to the fee.
Backflow Prevention Device Testing: A $61 service charge shall be imposed for backflow
prevention device testing or inspection performed by the County for County Code §l3.20
compliance, Cross-Connection Control.
Service Restoration:
The fee to restore service that has been discontinued due to non-payment of water service
charges and fees shall be the actual cost to restore service with a minimum charge of $25.
The fee to cover the costs of administering the termination and subsequent restoration of service
shall be $25. Water service will be restored to regular status upon request from the customer and
will be turned on no later than the next business day. If the customer requests that water service
be restored outside of regular business hours, a service charge equal to the costs incurred may be
charged.
Charges for Water Delivery to Users Not in CSA # 11 (Short-term Usage):
When available, water may be made available to parcels not in CSA #11 at twice the rate
charged to regular customers for the same bi-monthly period usage. In addition, a $500 fee shall
be charged for meter installation to record water usage, and a written services agreement setting
forth water delivery terms and conditions must be executed before water is delivered.
Financial Constraints and Opportunities
Shasta County has recently been upgraded from an A1 bond rating to Aa320, signifying that the
risk of default is low. An Aa3 bond rating is one of the top ratings assigned by Moody’s, a bond
credit rating agency. The bond rating basis is like an individual’s credit report. It evaluates the
bond issuer’s ability to make payments to bondholders and assists creditors with decisions to
extend credit.
Adopting a Capital Improvement Program, charging associated program fees and further
investigation into CSA #11 parcels receiving short-term water usage are suggested.
Cost Avoidance Opportunities
Regular system consumption monitoring, infrastructure condition inspections, scheduled
replacement and upgrades, and a Capital Improvement Program are effective cost avoidance
measures. The County monitors the system with meter records and conducts periodic inspections.
20 Moody’s Investors Service, Moody’s Upgrades to Aa3 from A1 Shasta County, CA’s 2013A Lease Revenue Refunding Bonds, September
30, 2016. https://www.moodys.com/research/Moodys-Upgrades-to-Aa3-from-A1-Shasta-County-CAs-2013A--
PR_903622926?WT.mc_id=AM%7eRmluYW56ZW4ubmV0X1JTQl9SYXRpbmdzX05ld3NfTm9fVHJhbnNsYXRpb25z%7e20160930_P R_903622926
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 25 February 2020
County staff has considered switching from bi-monthly direct billing for long-term standby service
to establishing an annual service charge for each parcel payable via the annual tax bill as a
means of reducing delinquencies and billing expenses.
Accountability and Governance
As noted earlier, CSA #11 is governed by the County Board of Supervisors (BOS). Meetings are
held on Tuesday’s at 9:00 am in the Board Chambers at 1450 Court Street in Redding21. The CSA
currently does not have an independent website. A website, or page on the County website, to
post about services rates, water quality information and Board actions concerning the CSA should
be considered. Dependent CSAs are not subject to SB 929 legislation requiring District websites.
CCR’s posted online at: https://www.co.shasta.ca.us/index/pw_index/operations/csas.aspx
Budgets are approved annually by the BOS which then establishes the scope of work and
improvements that can be performed. The BOS, as the district board of directors, authorizes and
approves any contracts used to construct improvements or perform maintenance work, or to
conduct studies, designs, or engineered changes to the water system. The Board communicates
directly with the Director of Public Works and/or department staff during weekly Board meetings
or through written communications.
CSA #11 has a Community Advisory Board (CAB). These typically consist of seven (7) members
who serve as a liaison between CSA residents and the County.
CABs were established by the County in 1984 pursuant to Resolution No. 84-6 with CAB members
appointed by the County Board of Supervisors for two-year terms. Each year property owners are
invited to nominate CAB candidates for vacant CAB seats. Elections are held if willing candidates
exceed the number of vacant seats. CABs provide for local participation and County
accountability. Affected constituents may provide input directly to County staff or the respective
member of the Board of Supervisors.
Municipal Service Review Determinations
(1) Growth and population projections for the affected area
a) CSA #11 has an estimated population of 277. The projected 2024 French Gulch area
population is 310 to 412.
b) County Staff has provided a figure showing a continuous boundary, which includes
combining the two northern pieces of land within the French Gulch boundary to the
remainder of the boundary in the south, as shown on the most current LAFCo Figure. LAFCo
accepts the County Figure as part of the MSR.
(2) The location and characteristics of any disadvantaged unincorporated communities within or
contiguous to the sphere of influence
a) CSA#11 has been identified as being a DUC. There are no other DUCs in the vicinity that
could be served by the CSA.
(3) Present and planned capacity of public facilities and adequacy of public services, including
infrastructure needs or deficiencies
a) According to the 2018 CCR, there was a violation for disinfection byproducts most likely
related to increased pre-chlorination due to runoff through the CARR Fire burn scar
21 Dates of scheduled meetings can be found online at https://www.co.shasta.ca.us/docs/libraries/bos-docs/bos-
meetings/bos-meetings-calendar-2020.pdf.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 26 February 2020
effecting raw water quality. The County completed a post chlorination project at the
Water Treatment Plant to address and correct the problem.
b) Most of the water pipeline is composed of PVC and was installed in 1993. A very small
portion was installed in 1996. PVC pipe has a 100-year plus service life and should be in
good condition and last through the next several MSR cycles if well maintained.
c) According to a CSA #11 public water system survey, conducted by the State Water
Resources Control Board on October 16, 2015, the system is operating at a production rate
between 104 and 111 gpm using one clarification/filtration unit. Based on specifications
provided for the Roberts Pacer II contact clarification/filtration unit (clarifier and filter bed
areas, 10 ft2 and 20 ft2) and an allowable loading rate developed from Alternative
Demonstration Studies (10 gpm/ft3 and 5 gpm/ft3), the maximum allowable loading rate is
100 gpm for each unit. System control settings are checked, and flow rates adjusted, to
ensure adequate treatment.
(4) Financial ability of agencies to provide services
a) CSA #11 has experienced a budget surplus since the beginning of the 2018 Financial Year.
However, staff recommends adopting a Capital Improvement Program and charging
associated program fees in order to plan for future maintenance costs.
(5) Status of and, opportunities for, shared facilities
a) There are presently inherent limitations – geographically and operationally – on CSA #11
water service facilities being extended to and/or shared with other communities. There is
no known overlapping or duplication of services within the CSA’s boundaries. The County
operates multiple CSAs and has shared operations and management practices in place
for efficient collective operations.
(6) Accountability for community service needs, including governmental structure and
operational efficiencies
a) The CSA is governed by the Shasta County Board of Supervisors and a CAB. The CSA
demonstrated accountability and transparency by disclosing financial and service-
related information in response to LAFCO requests.
(7) Any other matter related to effective or efficient service delivery.
a) None beyond those noted above.
Sphere of Influence Determinations
In order to carry out its purposes and responsibilities for planning and shaping the logical and
orderly development of local governmental agencies to advantageously provide for the present
and future needs of the county and its communities, the commission shall develop and determine
the sphere of influence of each city, as defined by Government Code §56036, and enact policies
designed to promote the logical and orderly development of areas within the sphere. In
determining the sphere of influence of each local agency, the commission shall consider and
prepare a written statement of its determinations with respect to the following:
1) Present and planned land uses in the area, including agricultural and open-space lands.
a) Land Use designations within the CSA is primarily Rural Residential B (RB). Other Land Use
designations include Rural Residential A (RA), Habitat Resource (N-H-40), and Public Land
(PUB) in the surrounding area.
b) The Commission discourages the annexation of agricultural lands for the purpose of
promoting urban development.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 27 February 2020
2) Present and probable need for public facilities and services in the area.
a) CSA #11 provides water services to 82 service connections.
b) It is unlikely that there will be a need for connections outside the boundary at this time.
3) Present capacity of public facilities and adequacy of public services that the agency provides
or is authorized to provide.
a) As discussed in this MSR, the system has a capacity almost double the current demand.
b) Recent treatment system modifications have corrected past standard exceedances and
no future quality issues are anticipated.
4) Existence of any social or economic communities of interest in the area if the commission
determines that they are relevant to the agency.
a) There are no communities of any social or economic interest in the adjacent areas.
5) For an update of a sphere of influence of a city or special district that provides public facilities
or services related to sewers, municipal and industrial water, or structural fire protection, the
present and probable need for those public facilities and services of any disadvantaged
unincorporated communities within the existing sphere.
a) French Gulch is a Census Designated Place and according to the 2018 ACS 5-year
estimate, it has a MHI of $42,91722. This is 60% of the reported California MHI of $71,228. This
is an increase from the 2014 ACS 5-year estimate of $28,750, but it is still well below the
California MHI. As such, French Gulch is considered a DUC.
b) The current CSA boundary in Shasta LAFCo records is segmented. It is recommended that
the CSA boundary be updated to provide a more logical and contiguous boundary as
defined by County records.
22ACS MHI 5-year Estimates (2013-2018), Table B19013 for French Gulch CDP, California.
Shasta County MSR/SOI Update
CSA 8 Palo Cedro & 11 French Gulch 28 February 2020