LAFCO
Adopted 4.20.2021
Read the report at Local Agency Formation Commissions ↗
Trinity Public Utilities District
Municipal Service Review &
Sphere of Influence Update
Adopted
April 20, 2021
Trinity
Local Agency Formation Commission
Exhibit A. TPUD Jurisdictional Boundary and SOI
TABLE OF CONTENTS
INTRODUCTION ............................................................................................................................................ 1
AGENCY OVERVIEW ...................................................................................................................................... 4
2.1 FORMATION ........................................................................................................................................................ 4
2.2 SERVICES ............................................................................................................................................................ 5
2.3 BOUNDARY AND SPHERE ........................................................................................................................................ 5
GOVERNMENT STRUCTURE .......................................................................................................................... 7
3.1 GOVERNING BODY ................................................................................................................................................ 7
3.2 ADMINISTRATION, MANAGEMENT & STAFFING .......................................................................................................... 7
3.3 BUILDINGS, LANDS & OTHER ASSETS ....................................................................................................................... 8
3.4 PUBLIC OUTREACH ............................................................................................................................................... 8
3.5 ACCOUNTABILITY .................................................................................................................................................. 8
SERVICES & INFRASTRUCTURE ...................................................................................................................... 9
4.1 SERVICES PROVIDED .............................................................................................................................................. 9
4.2 ELECTRICITY SOURCE ............................................................................................................................................. 9
4.3 SUBSTATIONS .................................................................................................................................................... 10
4.4 DISTRIBUTION SYSTEM ........................................................................................................................................ 11
4.1 WILDFIRE RISK REDUCTION .................................................................................................................................. 12
4.2 ELECTRICITY DEMAND ......................................................................................................................................... 14
4.3 ELECTRICITY RATES ............................................................................................................................................. 14
FINANCING ................................................................................................................................................. 16
5.1 FISCAL OVERVIEW .............................................................................................................................................. 16
5.2 REVENUE & EXPENSES......................................................................................................................................... 16
5.3 CAPITAL OUTLAY ................................................................................................................................................ 17
5.4 BUDGET RESERVES ............................................................................................................................................. 18
5.5 AUDIT INFORMATION .......................................................................................................................................... 18
5.6 DEBT AND CAPITAL LEASES ................................................................................................................................... 19
GROWTH AND POPULATION ....................................................................................................................... 20
6.1 LAND USE ......................................................................................................................................................... 20
6.2 EXISTING POPULATION AND PROJECTED GROWTH .................................................................................................... 20
6.3 DISADVANTAGED UNINCORPORATED COMMUNITIES ................................................................................................. 20
MUNICIPAL SERVICE REVIEW DETERMINATIONS ........................................................................................ 22
SPHERE OF INFLUENCE DETERMINATIONS .................................................................................................. 24
REFERENCES ............................................................................................................................................... 25
LIST OF FIGURES AND TABLES
TABLE 1: AGENCY PROFILE ................................................................................................................................................................ 4
TABLE 2: BOARD OF DIRECTORS ....................................................................................................................................................... 7
TABLE 3: EXISTING SUBSTATIONS ................................................................................................................................................... 11
TABLE 4: EXISTING DISTRIBUTION SYSTEM ..................................................................................................................................... 12
TABLE 5: ELECTRICITY RATES........................................................................................................................................................... 15
TABLE 6: BUDGET SUMMARY ......................................................................................................................................................... 17
TABLE 7: CAPITAL OUTLAY .............................................................................................................................................................. 17
TABLE 8: BUDGET RESERVE BALANCES ........................................................................................................................................... 18
TABLE 9: AUDIT INFORMATION ...................................................................................................................................................... 19
FIGURE 1: DISTRICT BOUNDARY AND SOI ......................................................................................................................................... 6
FIGURE 2: DISTRICT LAND USE ........................................................................................................................................................ 21
Trinity PUD Adopted
MSR/SOI Update April 20, 2021
INTRODUCTION
This Municipal Service Review (MSR) and Sphere of Influence (SOI) Update was prepared as part
of a mandated review of the municipal services of all government entities in the county by the
Trinity Local Agency Formation Commission (LAFCo). This report focuses on the Trinity Public
Utilities District (PUD). The purpose of this study is to assess existing and future public service
conditions and to evaluate organizational options for accommodating growth and ensuring critical
services are provided efficiently. This MSR presents a discussion, analysis, and recommendations
regarding services provided by Trinity PUD.
1.1 Trinity LAFCo
Local Agency Formation Commissions (LAFCos) are quasi-legislative, independent local agencies
that were established by State legislation in 1963 to oversee the logical and orderly formation and
development of local government agencies including cities and special districts. There is one LAFCo
for each county in California.
LAFCo is responsible for implementing the Cortese-Knox-Hertzberg Local Government
Reorganization Act of 2000 (California Government Code Section 56000 et. seq.) in order to
promote orderly growth, prevent urban sprawl, preserve agricultural and open space lands, and
oversee the efficient provision of municipal services.
LAFCo has the authority to establish and reorganize cities and special districts, change their
boundaries and authorized services, allow the extension of public services, perform municipal
service reviews, and establish spheres of influence. Some of LAFCo’s duties include regulating
boundary changes through annexations or detachments and forming, consolidating, or dissolving
local agencies.
Trinity LAFCo has a public Commission with seven regular Commissioners and three alternate
Commissioners. The Commission is composed of three members of the Trinity County Board of
Supervisors, two Special District Representatives, and two Public Members-At-Large. The
Commission also includes one alternate member for each represented category.
1.2 Public Utility Districts and Principal Act Overview
Public Utility Districts are independent special districts governed under the Public Utility District
Act (Public Utilities Code § 15501 – 18055). A PUD may be authorized to acquire, construct, own,
operate, control, or use works for supplying light, water, power, heat, transportation, telephone
service, or other means of communication, or means for the disposal of garbage, sewage, or refuse
matter. In addition, a PUD can be authorized to provide a wide variety of services including fire
protection, street lighting system, public parks and other recreation facilities, and stormwater
drainage of roads, streets, and public places. PUDs are governed by a board of directors, all of
whom are elected at large.
Trinity PUD Adopted
MSR/SOI Update 1 April 20, 2021
Trinity PUD is authorized to provide electricity services only. All other remaining services, facilities,
functions or powers enumerated in the District’s principal act but not being exercised are
considered “latent”. Activation of these latent powers and services requires LAFCo authorization.
1.3 Municipal Service Review Determinations
Government Code § 56430 requires LAFCo to conduct a review of municipal services provided in
the county by region, sub-region or other designated geographic area, as appropriate, for the
service or services to be reviewed, and prepare a written statement of determinations with
respect to each of the following topics:
1. Growth and population projections for the affected area;
2. The location and characteristics of any disadvantaged unincorporated communities within or
contiguous to the sphere of influence;
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies (including needs or deficiencies related to sewers,
municipal and industrial water, and structural fire protection in any disadvantaged,
unincorporated communities within or contiguous to the sphere of influence);
4. Financial ability of agencies to provide services;
5. Status of, and opportunities for, shared facilities;
6. Accountability for community service needs, including governmental structure and
operational efficiencies; and
7. Any other matter affecting or related to effective or efficient service delivery, as required by
Commission policy.
State Guidelines and Commission policies encourage stakeholder cooperation in the municipal
service review process. It also provides a basis to evaluate, and make changes to Spheres of
Influence, if appropriate.
1.4 Sphere of Influence Determinations
A Sphere of Influence (SOI) is a LAFCo-approved plan that designates an agency’s probable physical
boundary and service area. Spheres are planning tools used to provide guidance for individual
boundary change proposals and are intended to encourage efficient provision of organized
community services, discourage urban sprawl and premature conversion of agricultural and open
space lands, and prevent overlapping jurisdictions and duplication of services.
LAFCo is required to establish SOIs for all local agencies and enact policies to promote the logical
and orderly development of areas within the SOIs. Furthermore, LAFCo must update those SOIs
every five years or as needed. For a SOI update, LAFCo is required to conduct an MSR and adopt
related determinations. It must also make the following SOI determinations:
1. The present and planned land uses in the area, including agricultural and open-space lands;
2. The present and probable need for public facilities and services in the area;
Trinity PUD Adopted
MSR/SOI Update 2 April 20, 2021
3. The present capacity of public facilities and adequacy of public services that the agency
provides or is authorized to provide;
4. The existence of any social or economic communities of interest in the area if the Commission
determines that they are relevant to the agency; and
5. The present and probable need for public facilities and services related to sewers, municipal
or industrial water, or structural fire protection of any disadvantaged unincorporated
communities within the existing sphere of influence (effective July 1, 2012).
1.5 Review Methods
The following information was considered in the development of this service review:
Agency-specific data: responses to LAFCo Requests for Information
o
Demographic data: U.S. Census Bureau; Department of Finance
o
Finances: budgets, audits, rates and fees
o
Other Reports: Trinity PUD 2020 Wildfire Mitigation Plan
o
Information gathered was analyzed and applied to make the required determinations. All
information gathered for this report is filed by LAFCo for future reference.
1.6 California Environmental Quality Act
The California Environmental Quality Act (CEQA) is contained in Public Resources Code § 21000 et
seq. Public agencies are required to evaluate the potential environmental effects of their actions.
MSRs are statutorily exempt from CEQA pursuant to § 15262 (feasibility or planning studies) and
categorically exempt pursuant to CEQA Guidelines § 15306 (information collection). CEQA
requirements are applicable to SOI Updates. The CEQA lead agency for SOI Updates is most often
LAFCo, unless an agency has initiated an SOI expansion or update.
Trinity PUD Adopted
MSR/SOI Update 3 April 20, 2021
AGENCY OVERVIEW
Table 1: Trinity PUD Agency Profile
Formation
Agency Name Trinity Public Utilities District
Formation Date 1981
Principal Act Public Utility District Act (Public Utilities Code § 15501 – 18055)
Contact
Main Contact Paul Hauser, General Manager
E-mail phauser@trinitypud.com
District Office Address 26 Ponderosa Lane, Weaverville, CA 96093
Mailing Address PO Box 1216, Weaverville, CA 96093
Alternate Contact Sarah Sheetz, Administrative Services Manager
Phone (530) 623-5536
Website www.trinitypud.com
Governance
Governing Body 5 Member Board of Directors
Board Meetings 2nd Thursday of the month at 2PM
Staffing 4 Administrative staff members
Services
Services Provided Electricity
Areas Served Approximately 1.4 million acres (2,200 square miles)
Population Served Approximately 12,000
2.1 Formation
The Trinity Public Utilities District (Trinity PUD) was originally formed by general election in 1981
and included approximately 10 square miles, or less than 1% of the area of Trinity County. In 1992,
voters in substantially the entire county approved, via election, the annexation of approximately
64% of the area of the County into the District. The expanded District as it exists today currently
includes approximately 2,200 square miles, which is approximately 65% of the land area of Trinity
County and 85% of the population.
The District is the exclusive provider of retail electric distribution service within its boundaries. The
District purchases its power from the Western Area Power Administration pursuant to a first
preference right granted by Congress as part of the Trinity River Division Act of 1955. The TRD Act
provided for the United States Government to build Trinity Dam and reserves, in perpetuity, the
first twenty-five percent of the resulting energy generated to be sold at cost for use within Trinity
County. The Act also provides for the Federal government to build those facilities necessary to
deliver the power to Trinity County. The District has spent decades working to maximize power
allocation, protect first preference rights, expand transmission infrastructure, and improve
reliability and cost of service to District customers.
Trinity PUD Adopted
MSR/SOI Update 4 April 20, 2021
2.2 Services
The electric system of the District is primarily an electricity distribution and sub-transmission
system; the District does not operate any generation assets. The District's assets include nine
substations located within the County, approximately 600 miles of overhead distribution lines lines
that are located in rugged and mountainous terrain. Its service area covers approximately 2,200
square miles in Trinity County and is sparsely populated, with fewer than 12 customers per mile
of line.
Pursuant to federal legislation passed in 1955, the District has a first preference right to power
produced by the Trinity River Division of the Central Valley Project. The District's entitlement has
always exceeded the peak usage of the Electric System and is expected to continue to do so for
the foreseeable future.
2.3 Boundary and Sphere
Trinity PUD covers approximately 1.4 million acres in Trinity County including the communities of
Big Bar, Big Flat, Coffee Creek, Douglas City, Forest Glen, Helena, Junction City, Lewiston, Hayfork,
Hyampom, Trinity Center, Weaverville, and Wildwood. The District boundary does not include the
communities of Ruth, Mad River, Zenia and Kettenpom in the southern portion of Trinity County,
nor does it include the communities of Denny, Del Loma, Burnt Ranch, Hawkins Bar and Salyer in
the western portion of the County. In addition, the territory covering Post Mountain PUD is not
included within the District; however, the Post Mountain PUD area is included within the District’s
sphere of influence (see Figure 1). Post Mountain PUD currently provides fire protection and
limited road maintenance services.
There have been no changes to the District’s boundary since 1993, when Trinity PUD entered into
a $12,000,000 Settlement Agreement with PG&E, which provided for Trinity PUD to acquire the
Hayfork Valley PUD and purchase the distribution facilities for most of Trinity County, specifically
those areas served by what was then known as the Weaverville Service Center of PG&E. As part of
this reorganization, Trinity LAFCo approved the annexation of territory previously served by
PG&E’s Weaverville Service Center and the area served by Hayfork Valley PUD, and concurrently
dissolved Hayfork Valley PUD (Resolution No. 92-04). The annexation did not include the area
within Post Mountain PUD (Trinity Pines Subdivision area). There was no change to the five-
member Board makeup of Trinity PUD, which continued to be elected at-large. An election was
held to obtain approval from registered voters within the existing service area of Trinity PUD, the
areas proposed to be annexed, and the service area of Hayfork Valley PUD.
There is no consideration by the District of combining with any public utility districts since there
are no other districts that provide electrical distribution in the County, other than PG&E, a privately
held utility.
Trinity PUD Adopted
MSR/SOI Update 5 April 20, 2021
Figure 1. District Boundary and SOI
Trinity PUD Adopted
MSR/SOI Update 6 April 20, 2021
GOVERNMENT STRUCTURE
3.1 Governing Body
Trinity PUD is governed by a five-member Board of Directors, elected at large by District residents
to serve staggered four-year terms (Table 2). Each year the members select officers, including a
President, Vice President and Clerk of the Board. The Board meets on the 2nd Thursday of each
month at the District Office, 26 Ponderosa Lane in Weaverville. Meeting dates and agendas are
posted at least 72 hours prior to meetings at the District Office and are available on the District’s
website.
Table 2: Trinity PUD Board of Directors
Board Member Title Term Expiration
Mike Rourke President December 2022
Alex Cousins Vice President December 2024
Andy Johnson Director December 2024
Kelli Gant Director December 2024
Richard “Dick” Morris Board Clerk December 2022
3.2 Administration, Management & Staffing
The management of the District is the responsibility of the General Manager as appointed by the
Board. Administrative and fiscal recommendations are made by the General Manager to the
District Board for approval. Three employees report directly to the General Manager including the
Chief Financial Officer, the Electric Superintendent, and the Administrative Services Manager.
There are a total of 23 full-time and 2 part-time District employees. The District has a policy and
procedures manual for all employees. Annual audits performed by an independent accounting
firm, attorney needs, and the majority of studies are contracted out to save the costs that would
otherwise be associated with additional staff positions for those services.
The District participates in the Local Agency Investment Fund (LAIF) a voluntary program created
by statute (California Government Code Sections 16429). The District participates in risk pools with
the Special District Risk Management Authority (SDRMA) which provides property, liability, and
workers' compensation insurance to its member districts.
Effective July 4, 2004, the District became a participant in the California Public Employees
Retirement System (PERS) and began making contributions into the pension plan. The District
offers its employees an employee funded deferred compensation plan created in accordance with
Trinity PUD Adopted
MSR/SOI Update 7 April 20, 2021
Internal Revenue Code Section 457. The District provides vacation, holiday and sick leave
payments to its employees.
3.3 Buildings, Lands and Other Assets
The District owns approximately 3.5 acres in Weaverville which contains the approximate 5,000
square foot office plus an approximate 10,000 square foot maintenance and warehouse facility,
in addition to customer and employee parking, and vehicle storage. The District owns a fleet of 19
vehicles including snow cats, pick-ups, and line trucks. In addition, the District owns the seven sub-
station lands, which range from one-quarter to one-half-acre in size, and one sub-station
permitted on Forest Service land (Forest Glen).
3.4 Public Outreach
The District maintains a website at www.trinitypud.com which is a helpful communication tool to
enhance government transparency and accountability. The website provides service-related
information, includes multiple years of budgets and audit information, and includes archived
meeting agendas and minutes.
SB 929 (McGuire) was signed into law on September 14, 2018 requiring all independent special
districts to have and maintain a website by January 1, 2020, meeting all the special district
transparency requirements of State law including the availability of agendas, policies, and financial
information. Trinity PUD currently complies with the SB 929 requirements.
Trinity PUD has adopted a series of Strategic Directions that were last updated in 2020. These
include consideration of safety, reliability, competitive rates, enterprise risk management,
customer relations, environmental leadership, and resource planning. The Strategic Directions are
used as a guide in the decisions made about Trinity PUD’s policies and operations.
3.5 Accountability
The Political Reform Act requires all state and local government agencies to adopt and promulgate
a conflict of interest code pursuant to Government Code §81000 et seq. The Political Reform Act
also requires persons who hold office to disclose their investments, interests in real property, and
incomes by filing a Statement of Economic Interests (Fair Political Practices Commission Form 700)
each year pursuant to Government Code §87203. Trinity PUD has a conflict of interest code and
otherwise complies with the Political Reform Act requirements.
According to AB 1234, if a local agency provides compensation or reimbursement of expenses to
local government officials, then all local officials are required to receive two hours of training on
public service ethics laws and principles at least once every two years and establish a written policy
on reimbursements pursuant to Government Code §53235. In addition, AB 1661 went into effect
in 2016 and addresses local government sexual harassment prevention training and education.
Trinity PUD provides both ethics training and sexual harassment training to all Board members.
Trinity PUD Adopted
MSR/SOI Update 8 April 20, 2021
SERVICES & INFRASTRUCTURE
4.1 Services Provided
Trinity PUD provides sub-transmission and electricity distribution to approximately 12,000
consumers in a 2,200 square mile area in Trinity County. Trinity PUD is directly connected to the
Western Area Power Administration grid by 60-kV sub-transmission facilities and a 230-kV
transmission line. Trinity PUD receives 100% of its power from the Western Area Power
Administration (WAPA).1 Total annual retail load was approximately 125 million kilowatt hours
(kWh) for 2020. Trinity PUD’s annual peak load has averaged 25 Megawatts (MW) over the last
three years.
4.2 Electricity Source
Electricity for distribution by Trinity PUD is supplied by hydroelectric dams that are part of
California’s Central Valley Project. The Bureau of Reclamation manages the dams that create
hydroelectricity. This electricity is managed by the WAPA, which then delivers the electricity to
Trinity PUD.
As mentioned previously, the 1955 Trinity River Division Act authorized the construction of the
Trinity River Division and the transfer of water resources of the Trinity River to the Central Valley.
Reclamation completed the Trinity River Division in 1964. Water from the Trinity River Basin is
stored, regulated, and diverted through a system of dams, reservoirs, tunnels, and powerplants as
described below:
• Trinity Dam and Lake: Trinity Dam regulates flows and stores water for various uses.
Completed in 1962, Trinity Dam is an earthfill structure 538 feet high with a crest length of
2,450 feet. The dam forms Trinity Lake, which has a storage capacity of 2,448,000 acre-
feet.
• Trinity Powerplant: Trinity Powerplant at Trinity Dam has two generators with a total
capacity of 140,000 kilowatts.
• Lewiston Dam and Lake: Lewiston Dam is about 8 miles downstream from Trinity Dam. The
dam creates an afterbay to Trinity Powerplant and regulates releases into the Trinity River.
Lewiston Dam is an earthfill structure 91 feet high and 754 feet long, forming a reservoir
1 WAPA is a power marketing administration within the Department of Energy (DOE). WAPA has a statutory responsibility to
make the necessary arrangements to deliver Federal power to Federally authorized water projects and to market and deliver
cost-based Federal power in excess of that needed to meet Federal load to wholesale preference customers in regions within the
central and western United States. WAPA's preference customers include Federal and State agencies, Native American tribes,
electric cooperatives, municipal utilities, public utility districts, irrigation districts, and water districts.
Trinity PUD Adopted
MSR/SOI Update 9 April 20, 2021
with a storage capacity of 14,660 acre-feet. The trans-basin diversion begins at Lewiston
Lake via Clear Creek Tunnel to Whiskeytown Lake.
• Lewiston Powerplant: Lewiston Powerplant at Lewiston Dam has one generator with a
capacity of 350 kilowatts.
• Clear Creek Tunnel: Clear Creek Tunnel, 17.5 feet in diameter and 10.7 miles long, conveys
up to 3,200 cfs from Lewiston Lake to Judge Francis Carr Powerhouse and Whiskeytown
Lake. It is the conduit for the trans-basin diversion.
• Carr Powerhouse: Judge Francis Carr Powerhouse, on Clear Creek, has two generators with
a total capacity of 154,400 kilowatts.
• Whiskeytown Dam and Lake: Located on Clear Creek, Whiskeytown Dam stores Clear Creek
runoff and diverted Trinity River flows discharged from Carr Powerhouse. The dam is an
earthfill structure 282 feet high with a crest length of 4,000 feet. Whiskeytown Lake has a
capacity of 241,100 acre-feet.
• Spring Creek Tunnel: The Spring Creek Tunnel diverts water from Whiskeytown Lake to the
Spring Creek Powerhouse and Keswick Dam on the Sacramento River.
On average, approximately 50% of Trinity County water passes through four sets of hydroelectric
turbines before it heads down to the farmers in the Central Valley. All four plants are included in
the Central Valley Project's Trinity River Division, and under the 1955 Trinity River Division Act,
Trinity County residents are entitled to 25 percent of energy produced at the plants, at cost. The
District's entitlement has always exceeded the peak usage of the Electric System and is expected
to continue to do so for the foreseeable future.
4.3 Substations
There are nine substations within the District, four of which are served from PG&E’s transmission
system; and five of which are served by the Western Area Power Administration Service’s
transmission system and Trinity PUD’s sub-transmission system. The District receives and meters
60-kV service as it enters the District substations. In the substations, the electricity is transformed
to a 12-kV distribution system and leaves the substation by means of 18 major feeder circuits. The
substations also have relays, recorders, lightning arresters, and standard equipment to protect the
transformers from overload or ground fault. The distribution system is principally an overhead
service type on wooden poles, with some underground lines. The substations are identified in
Table 3.
Trinity PUD Adopted
MSR/SOI Update 10 April 20, 2021
Table 3: Existing Substations
Substation Meters Capacity Voltage # of Transformers
Big Flat 126meters 1,000 kVA 60-12 kV 4
Douglas City 424 meters 3,000 kVA 60-12 kV 4
115-12 kV, single
Forest Glen 14 meters 250 kVA 2
phase
60-20.8 kV, single
Grouse Creek 7 meters 250 kVA 1
phase
Hayfork 1,510 meters 3,000 kVA 60-12 kV 4 and 1
Hyampom 187 meters 2,000 kVA 60-12 kV 4
Lewiston 1187 meters 3,750 kVA 60-12kV 4
Mill Street 13,333 kVA and
2,954 meters 60-12.47 kV 4 and 4
(Weaverville) 22,400 kVA
WAPA-Trinity 823 meters 345 kVA 21kV 2
PG&E also has a substation (Trinity Substation) in Weaverville which has a 45 MVA, 115-60 kV
autotransformer bank. It is the western termination of PG&E's Trinity-Keswick 60 kV circuit and
the eastern termination of PG&E's Trinity-Maple Creek circuit. The District owns 12 spans of 60 kV
that originates in the Trinity Substation and terminates at the Mill Street Substation. The District
also owns 27 miles of 60kV that supplies Douglas City and Hayfork Substations from Trinity
Substation.
4.4 Distribution System
The District’s distribution system consists of over 600 miles of primarily overhead distribution lines
on wooden poles, with some underground lines. Power is distributed throughout Trinity County
via a 21 kV, 12.47 kV, 12 kV and 7.2 kV sub-transmission system. The District’sdistribution system
is composed of three distinct types:
• Unigrounded System: The feeders are grounded at the substation. Distribution
transformer high side windings are 12 kV connected phase to phase.
• Multigrounded System: The ground wire is grounded at the substation and at multiple
points along the feeder. The Distribution transformer high side windings are connected
phase to ground. This includes most of Weaverville and Grouse Creek. The high side
windings of distribution transformers at Weaverville and Grouse Creek are 7.2 and 12.47
kV, respectively.
• The Delta System: Distribution transformer high side windings are 12 kV connected phase
to phase (Forest Glen area).
Trinity PUD Adopted
MSR/SOI Update 11 April 20, 2021
Table 4: Existing Distribution System
Number
Item
1999 (source 2006 MSR) 2020
Poles 11,253 12,355
Pads, vaults or junction boxes 435 313
Overhead distribution circuits 468.2 miles 600 miles
Underground distribution circuits 61.7 miles 150 miles
Trinity PUD is a member of the Northern California Joint Pole Association.
4.5 Wildfire Risk Reduction
The areas surrounding Trinity PUD's electric transmission and distribution systems are particularly
vulnerable to fire risk due to the dense vegetation and steep terrain. Trinity PUD and WAPA have
partnered to propose a proactive Wildfire Risk Reduction, Reliability, and Asset Protection (WRAP)
Project to reduce fire risk to the surrounding communities and public lands, as well as to increase
electric reliability to maintain critical services in local communities2. A Notice of Intent to prepare
a joint Environmental Impact Statement/Environmental Impact Report was circulated during a 45-
day public scoping period in December 2020. WAPA intends to prepare a joint EIS/EIR for the
proposed WRAP Project. Trinity PUD will be the lead agency for the CEQA EIR review process.
The project would reduce these fire risks by expanding WAPA's and Trinity PUD's existing
transmission/distribution rights-of-way (ROWs) and implementing a proactive, integrated
vegetation management program within the expanded ROWs. WAPA proposes to expand the
width of its ROW for its 17.5-mile, 60-kV transmission line between Trinity Substation and
Weaverville Switchyard from 80 feet to up to 130 feet on USFS, BLM, and private lands. This
transmission line provides the majority of the electricity to the Trinity PUD system. Trinity PUD
proposes to expand its utility ROW width from 20 feet to up to 130 feet for its overhead
transmission and distribution system (216.8 miles) in high-fire risk areas on USFS, BLM, BOR, and
private or other lands. The existing ROW easement for the underground distribution lines would
not change.
2 https://www.federalregister.gov/documents/2020/12/11/2020-27147/wildfire-risk-reduction-reliability-and-asset-protection-
wrap-project-trinity-county-california
Trinity PUD Adopted
MSR/SOI Update 12 April 20, 2021
Trinity PUD Adopted
MSR/SOI Update 13 April 20, 2021
4.6 Electricity Demand
Total annual retail load was approximately 125 million kilowatt hours (kWh) for 2020. Trinity PUD’s
annual peak load has averaged 25 megawatts (MW) over the last three years. This peak demand
occurs in the winter.
4.7 Electricity Rates
Trinity PUD maintains some of the cheapest electricity rates in the state. Trinity PUD divides its
residential service territory into two geographic zones, Geographic Zone A and Geographic Zone
B. Geographic Zone A customers pay an energy rate of $0.055, and Geographic Zone B customers
pay an energy rate of $0.078; electricity generation from solar photovoltaic (PV) systems installed
on customers’ homes are compensated at these same rates.
The difference in rates between the two zones is based on which part of the Trinity PUD
distribution system served each zone at the time distribution assets were acquired from investor-
owned utilities. All debts associated with the purchase of the older parts of the distribution system
have been paid (Geographic Zone A). The other parts of the distribution system were acquired
through a bond purchase in 1993.
On March 15, 2019, Trinity PUD submitted an application identifying that its residential energy
rates of $0.055 and $0.078 per kilowatt-hour are lower than the energy rates used by the
California Energy Commission (CEC) when determining cost-effectiveness of solar PV system
requirements, and that the 2019 Energy Code residential solar PV requirements are not cost-
effective when the Trinity PUD rates are used. Trinity PUD compensates customers at the full retail
rate for any customer-owned on-site generation. Based on this application, CEC staff performed a
cost-effectiveness analysis and found that applying Trinity PUD’s residential rates and its net
energy metering rules for the analysis resulted in solar PV to not be cost effective in their service
territory. Results showed that the energy bill savings from installation of an onsite solar PV system
is less than the solar PV system cost, resulting in a benefit-to-cost ratio of less than 1.0. As a result,
the CEC approved a resolution determining that the solar photovoltaic requirements in the 2019
Energy Code shall not apply to newly constructed low-rise residential buildings in the Trinity PUD
service area.
A residential rate comparison with other power providers in the state shows Trinity PUD’s
residential rate of $0.055 per kWh and $0.078 per kWh for Zones A and B respectively compared
to two other regional power providers with a rate of $0.240 per kWh for PG&E and 0.1711 per
kWh for Sacramento Municipal Utility District (SMUD).
A summary of rates for Trinity PUD can be seen in Table 5.
Trinity PUD Adopted
MSR/SOI Update 14 April 20, 2021
Table 5: Trinity PUD Electricity Rates3
Energy Charge System Access
Geographic Zone A Geographic Zone B
per kWh Charge
Residential $0.055 $0.078 $24.00
Commercial-General
$0.073 $0.093 $36.00
Service
Commercial-
$0.12 $0.14 $36.00
Unmetered
Demand charge:
Industrial $0.048 $0.65
$3.51 per/kWh
Agricultural pumping $0.056 $0.056 $24.00
Variable-dependent Variable-dependent
Street lighting-Public
on lamp type and on lamp type and
Lighting Authorities
wattage wattage
Variable-dependent Variable-dependent
Street Lighting on lamp type and on lamp type and
wattage wattage
State Agencies $0.087 $0.114 $36.00
High Impact $0.087 $0.111 $45.00
In addition to base service charges there are miscellaneous service charges that the District may
make including Connection or Reconnection Fees and Deposits that were last approved May
2020. Detailed information is available on their website4.
3 Rates available at https://www.trinitypud.com/rates
4 https://www.trinitypud.com/pdf/policies/miscellaneous-service-charges.pdf
Trinity PUD Adopted
MSR/SOI Update 15 April 20, 2021
FINANCING
5.1 Fiscal Overview
The Board of Directors is responsible for establishing and maintaining a system of internal
accounting control. The Board operates as a financial committee with guidance from the General
Manager. The annual budget is drafted and recommendations are made to the Board for approval.
In addition, monthly financial statements are presented to the Board for review and approval. The
basic financial statements of the District are prepared in accordance with Generally Accepted
Accounting Principles (GAAP).
The District approves its annual budget pursuant to Budget Guidelines adopted by the Board. In
accordance with the Budget Guidelines, the General Manager of the District presents to the Board
the Budget assumptions and District goals in the May Board meeting. A proposed budget for the
District is presented to the Board during the June Board meeting for the Fiscal Year commencing
the following July 1, together with a four-year financial plan, thus projecting the District's fiscal
position for the next five years. The resulting five-year financial plan must project a debt service
coverage ratio for senior obligations of not less than 1.35 on a cash basis. The Budget Guidelines
require each proposed budget to project monthly cash flow and be "zero based" (i.e., based on
salient estimates rather than fixed escalators).
In 1989, the District formed the Trinity County Public Utilities District Financing Corporation, a
nonprofit public benefit corporation to provide assistance to the District in financing capital
improvements. The Board of Directors of the Corporation is the same as the District's Board of
Directors. This entity was dissolved in 2020.
In 2010, the District formed the Trinity Public Utilities Financing Authority, a Joint Powers
Authority, to provide assistance to the District in financing and refinancing capital improvements.
The Board of Directors of the Authority is the same as the District’s Board of Directors.
5.2 Revenue and Expenses
The District budget for fiscal year 2020-21 shows operating receipts projected at $13,553,810,
operating expenditures of $10,890,738, thereby resulting in $2,663,072 available for capital
expenditures. The District’s primary revenue sources include energy sales and surcharge receipts.
The District’s expenses include power acquisition, operations and maintenance, customer
accounts, administrative and general and debt repayment. For the 2019-20 fiscal year the District’s
revenues exceeded its expenses by $1,990,648 (Table 6).
Trinity PUD Adopted
MSR/SOI Update 16 April 20, 2021
Table 6: Trinity PUD Budget Summary
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21
Actual Actual Actual Preliminary Budgeted
Revenues
Energy Sales $9,789,242 $9,893,492 $9,817,175 $10,334,904 $10,334,904
Surcharge
$1291,278 $381,510 $1,818,284 $90,000 $1,360,912
Receipts
Other Receipts $1,610,277 $1,230,890 $2,217,089 $2,707,163 $1,857,995
Total Revenues $12,690,797 $11,505,892 $13,215,548 $13,132,067 $13,553,810
Expenses
Power
$3,243,996 $1,570,385 $2,656,541 $3,060,547 $2,986,218
Acquisition
Operations &
$2,673,277 $2,715,801 $3,495,026 $3,698,415 $3,766,483
Maintenance
Customer
$894,235 $682,428 $708,997 $884,797 $801,482
Accounts
Administrative
$1,204,666 $1,219,960 $1,409,236 $1,276,531 $1,705,688
& General
Debt &
$1,802,770 $1,960,469 $1,622,736 $2,221,130 $1,630,866
Financing
Total Expenses $9,818,944 $8,149,043 $9,892,536 $11,141,419 $10,890,738
Net Income $2,871,853 $3,356,849 $3,323,012 $1,990,648 $2,663,072
5.3 Capital Outlay
The District’s net income is used for capital outlay, which includes improvements to District
electricity infrastructure and property. If the amount needed exceeds the annual net income then
the reserve funds are used to make up the difference.
Table 7: Trinity PUD Capital Outlay
FY 2020-21
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
Budgeted
Distribution/
$1,936,603 $1,957,902 $2,190,299 $3,637,155 $5,368,499
Transmission
Substations $26,681 $27,535 $104,445 $746,000 $447,575
Customer
$17,336 $2,389,724 $472,532 $245,772 $350,205
Accounts
Property &
$13,627 $33,220 $9,931 $110,000 $155,008
Facilities
Total Revenues $1,994,277 $4,408,381 $2,777,207 $4,738,927 $6,321,286
Trinity PUD Adopted
MSR/SOI Update 17 April 20, 2021
5.4 Budget Reserves
Trinity PUD maintains significant budget reserves details of which can be seen in Table 8 below.
Trinity PUD has a goal to maintain reserves in the amount of six months or more of Operations
and Maintenance Expenses, excluding power costs.
Table 8: Trinity PUD Budget Reserve Balances
FY 2020-21
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
Budgeted
Restricted $1,790,202 $610,607 $606,171 $22,500 $15,000
Encumbered $601128 $779,059 $599,710 $500,000 $1,123,645
Customer
$382,502 $438,172 $419,737 $455,593 $437,873
Funds
Dedicated $153,333 $219,000 $297,000 $442,407 $636,667
Contingency $7,578,129 $7,554,939 $8,370,668 $6,274,507 $1,973,608
Total Reserves $10,504,845 $9,601,777 $10,293,286 $7,695,007 $4,186,793
5.5 Audit Information
The District conducts annual audits and the available audit information indicates that the financial
health of the District is strong due to an increase in net position of $1.140 million. Audit results
are often not available for as much as six months after the end of the fiscal year.
As of this writing, the FY 19/20 audit has been completed and information from it can be seen in
Table 9. Total assets and deferred outflows of resources increased $0.433 million over the course
of FY 19/20. Total liabilities and deferred inflows of resources decreased $0.707 million for a net
increase to net position of $1.140 million.
Trinity PUD Adopted
MSR/SOI Update 18 April 20, 2021
Table 9: Trinity PUD FY 2019-20 Audit Information
2019 2020
Assets and Deferred Outflows of
$52,772,030 $53,204,961
Resources
Liabilities and Deferred Inflows of
$30,001,569 $29,294,542
Resources
Total Net Position $22,770,461 $23,910,419
Prepared by Baker Tilly Virchow Krause, LLP
5.6 Debt and Capital Leases
According to the FY 19/20 Audit, during FY 17/18, the District undertook a project to refinance the
majority of its debt obligations. At the end of fiscal year 2020, the District had total long-term debt
outstanding of $19.831 million, including current maturities. $19.570 million is comprised of 2017
Series A Electric Revenue Bonds and $0.261 million note payable to the United States Department
of Agriculture.
Trinity PUD Adopted
MSR/SOI Update 19 April 20, 2021
GROWTH AND POPULATION
6.1 Land Use
The Trinity County General Plan (2003) and Zoning Code guides land use decisions within Trinity
County. Trinity County encompasses approximately 3,208 square miles of land (or roughly 2.05
million acres). The predominant features of the county include the Trinity River, Trinity Lake, and
the Trinity Alps. Approximately 76 percent of the land is in State and Federal ownership, including
a large portion of the Trinity National Forest, Six Rivers National Forest, and the Shasta Trinity
National Recreational Area, as well as Bureau of Land Management lands. Of the roughly 24
percent of land in private hands, approximately 15 percent is industrial timber lands, while the
remaining 9 percent of land is mainly in agricultural, commercial and residential uses.
The area served by Trinity PUD is largely agricultural, commercial timber production lands,
recreation areas, and low density residential. More concentrated residential areas are located in
the communities of downtown Weaverville and Hayfork. The District also contains areas of light
industrial and commercial areas, generally along the Highway 299 corridor and includes areas
along the Trinity River and Weaver Creek (See Figure 2).
6.2 Existing Population and Projected Growth
Trinity PUD estimates a District population of approximately 12,000. The District will continue to
grow based on current countywide growth rates. Trinity County's total 2019 countywide
population is estimated to be 12,285, a decrease of -10.9% over the 2010 population of 13,786.
Opportunities for growth exist within communities, but constraints such as flood plains and steep
terrain are growth barriers for the remaining private lands within Trinity County.
6.3 Disadvantaged Unincorporated Communities
LAFCo is required to evaluate water service, sewer service, and structural fire protection within
disadvantaged unincorporated communities as part of municipal service reviews, including the
location and characteristics of any such communities. A disadvantaged unincorporated
community (DUC) is defined as any area with 12 or more registered voters where the annual
median household income is less than 80 percent of the statewide annual median household
income (pursuant to Government Code Section 56033.5 and Water Code Section 79505.5). Within
a DUC, three basic services are evaluated: water, sewage, and fire protection. Trinity PUD provides
electricity services only and is therefore responsible for assuring that this service is adequately
provided to the community. It can be assumed that communities outside of the Trinity PUD
boundary qualify as disadvantaged based on average median household incomes for Trinity
County.
Trinity PUD Adopted
MSR/SOI Update 20 April 20, 2021
Figure 2: District Land Use
Trinity PUD Adopted
MSR/SOI Update 21 April 20, 2021
MUNICIPAL SERVICE REVIEW DETERMINATIONS
This section addresses the requirements of the Cortese-Knox-Hertzberg Local Government
Reorganization Act of 2000 (California Government Code Section 56430). As part of the municipal
service review process, LAFCo makes the following written determinations.
1) Growth and population projections
Trinity PUD estimates a District population of approximately 12,000. The District will continue
to grow based on current countywide growth rates. Opportunities for growth exist within
communities, but constraints such as flood plains and steep terrain are growth barriers for the
remaining private lands within Trinity County.
2) The location and characteristics of any disadvantaged unincorporated communities within or
contiguous to the Sphere of Influence
LAFCo is required to evaluate water service, sewer service, and structural fire protection within
disadvantaged unincorporated communities as part of municipal service reviews. Trinity PUD
provides electricity services only and is therefore responsible for assuring that this service is
adequately provided to the community. It can be assumed that communities outside of the
Trinity PUD boundary qualify as disadvantaged based on average median household incomes
for Trinity County.
3) Present and planned capacity of public facilities and adequacy of public services, including
infrastructure needs or deficiencies
Trinity PUD provides sub-transmission and electricity distribution to approximately 12,000
consumers in a 2,200 square mile area in Trinity County. Under the 1955 Trinity River Division
Act, Trinity County residents are entitled to 25 percent of energy produced at the plants, at
cost. The District's entitlement has always exceeded the peak usage of the Electric System and
is expected to continue to do so for the foreseeable future.
Trinity PUD receives 100% of its power from the Western Area Power Administration (WAPA).
Total annual retail load was approximately 125 million kilowatt hours (kWh) for 2020. Trinity
PUD’s annual peak load has averaged 25 Megawatts (MW) over the last three years. This peak
demand occurs in the winter.
The areas surrounding Trinity PUD's electric transmission and distribution systems are
particularly vulnerable to fire risk due to the dense vegetation and steep terrain. Trinity PUD
and WAPA have partnered to propose a proactive Wildfire Risk Reduction, Reliability, and Asset
Protection (WRAP) Project to reduce fire risk to the surrounding communities and public lands,
as well as to increase electric reliability to maintain critical services in local communities.
4) Financial ability of agencies to provide services
Trinity PUD has adequate resources to provide services. For the 19/20 and 20/21 fiscal years
the District’s revenues exceeded its expenditures by $1,990,648 and $2,663,072 respectively.
The District conducts annual audits with the FY 20/21 audit most recently completed. Total
Trinity PUD Adopted
MSR/SOI Update 22 April 20, 2021
assets and deferred outflows of resources increased $0.433 million over the course of FY
19/20. Total liabilities and deferred inflows of resources decreased $0.707 million for a net
increase to net position of $1.140 million.
5) Status of, and opportunities for, shared facilities
There currently exists no opportunities to share facilities with other electric service providers
since there are no other districts that provide electrical distribution in the County, other than
PG&E, a privately held utility.
6) Accountability for community service needs, including governmental structure and
operational efficiencies
Trinity PUD is governed by a five-member Board of Directors. The District demonstrated
accountability and transparency by disclosing financial and service-related information in
response to LAFCo requests. Trinity PUD has a website that complies with new special district
website regulations (SB 929).
7) Any other matter related to effective or efficient service delivery, as required by commission
policy
Trinity PUD’s SOI is coterminous with the district boundary apart from the Post Mountain area
which corresponds with the service area of the Post Mountain PUD. Currently this area is not
served electrical services by Trinity PUD or Post Mountain PUD, which only provides fire
protection and limited road maintenance services. Should the Post Mountain area ever wish
to have electrical services provided, annexation to the Trinity PUD would be required. No
change to the District’s SOI is proposed at this time.
Trinity PUD Adopted
MSR/SOI Update 23 April 20, 2021
SPHERE OF INFLUENCE DETERMINATIONS
1) Present and planned land uses in the area, including agricultural and open-space lands.
The area served by the Trinity PUD is primarily agricultural, commercial timber production
lands, recreation areas, and rural residential uses. There are also areas of light industrial and
commercial uses. Opportunities for growth exist, but physical constraints such as flood plains
and steep terrain are barriers to growth.
2) Present and probable need for public facilities and services in the area.
The District boundary does not include the communities of Ruth, Mad River, Zenia and
Kettenpom in the southern portion of Trinity County, nor does it include the communities of
Denny, Del Loma, Burnt Ranch, Hawkins Bar and Salyer in the western portion of the County.
In addition, the territory covering Post Mountain PUD is not included within the District;
however, the Post Mountain PUD area is included within the District’s sphere of influence.
Prior to considering expanded services outside the current service area and within the sphere
of influence, Trinity PUD must demonstrate the ability to provide services to those areas.
3) Present capacity of public facilities and adequacy of public services that the agency provides
or is authorized to provide.
Electricity for distribution by Trinity PUD is supplied by hydroelectric dams that are part of
California’s Central Valley Project. The Bureau of Reclamation manages the dams that create
hydroelectricity. This electricity is managed by the WAPA, which then delivers the electricity
to Trinity PUD. The current capacity of public facilities provided by the District appear to be
adequate to serve current and future demand within the District Boundary.
4) Existence of any social or economic communities of interest in the area if the commission
determines that they are relevant to the agency.
Trinity PUD provides sub-transmission and electricity distribution to approximately 12,000
consumers in a 2,200 square mile area in Trinity County. The District is the exclusive provider
of retail electric distribution service within its boundaries. The District works to maximize
power allocation, protect first preference rights, expand transmission infrastructure, and
improve reliability and cost of service to District customers.
5) For an update of a sphere of influence of a city or special district that provides public facilities
or services related to sewers, municipal and industrial water, or structural fire protection, the
present and probable need for those public facilities and services of any disadvantaged
unincorporated communities within the existing sphere.
Trinity PUD provides electricity services only and is therefore responsible for assuring that this
service is adequately provided to the community. It can be assumed that communities outside
of the Trinity PUD boundary qualify as disadvantaged based on average median household
incomes for Trinity County.
Trinity PUD Adopted
MSR/SOI Update 24 April 20, 2021
REFERENCES
State of California Department of Finance:
http://www.dof.ca.gov/Forecasting/Demographics/Estimates/E-1/
Trinity PUD FY 2018-19 Audited Financial Statements. Baker Tilly Virchow Krause, LLP
Trinity PUD 2006 Municipal Service Review.
Trinity PUD 2020 Wildfire Mitigation Plan.
US Census Bureau: https://www.census.gov/quickfacts/table/PST045215/06
Trinity PUD Adopted
MSR/SOI Update 25 April 20, 2021