This section provides an overview of the written determinations findings of the Farmersville Municipal
Service Review. As part of its review of municipal services, LAFCO is required to prepare a written
statement of its determination with respect to each of the following: 1) Growth and population projections
for the affected area; 2) Infrastructure needs and deficiencies; 3) Financing constraints and opportunities;
4) Cost avoidance opportunities; 5) Opportunities for rate restructuring; 6) Opportunities for shared
facilities; 7) Government structure options; 8) Evaluation of management efficiencies; and 9) Local
accountability and governance. These requirements are established by the AB 2838, the Cortese-Knox-
Hertzberg Local Government Reorganization Act of 2000. The Farmersville MSR identifies the
following written determinations.
Written Determinations
1) Growth and Population
Historical Data
1. Based upon Census 2000 data, Farmersville had an incorporated land area of approximately
1.9 square miles, a total population of 8,737, and 2,269 housing units.
2. Census 2000 data also indicates that the average dwelling unit occupancy rate for the City is
approximately 4.1 persons per household, which is significantly higher than the County
average of 3.3 persons per household.
3. The Farmersville General Plan Update estimates a build-out population of 17,854,
corresponding to an annual average growth rate of 2.9%, estimated to occur by year 2025.
4. California Department of Finance data indicates that as of January 1, 2005, Farmersville had
a population of 10,240, corresponding to an annual average growth rate of approximately
3.3% between 2000 and 2005.
Current Boundaries
1. A City’s SOI typically lies between a City’s UDB, and UAB, or, in some cases, may be
coterminous with a City’s UDB. Farmersville’s SOI extends beyond the City’s UDB, and is
within the City’s UAB, consistent with current planning boundary definitions. The UAB and
UDB lines were adopted by the City in 1999 and by Tulare County in 2000.
2. The Farmersville General Plan Update indicates that, in 2002, there was 1,205 acres of land
within the City Limits, 1,726 acres of land within the UDB, and 2,952 acres of land within
the UAB. According to the Tulare County GIS database, the Farmersville SOI contains
approximately 2,517 acres of land.
Land Use
1. The City’s General Plan Update provides an excellent tool for guiding future growth in
Farmersville. The plan provides a detailed evaluation of current land use, and projected
City of Farmersville MSR Page 2-1
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
residential, commercial/office, industrial, parks, and school land demands to accommodate
growth through the year 2025.
2. The General Plan Update concludes that there is more than enough land within the UDB to
accommodate growth to the year 2025. The GPU also notes that City officials consider
Farmersville to be grossly under-developed with commercial and industrial development, as
compared to other Tulare County Cities. However, City officials have more recently
indicated that growth and interest in the City have increased dramatically since the
aforementioned information was documented.
3. To meet the provisions of current law, and to maintain consistency with the General Plan
Update (which includes updates to the Land Use, Circulation, Conservation, and Open Space
Elements), the City adopted a comprehensive update to their General Plan Housing Element
in early 2005 consistent with current requirements set forth by State law. Proposition 46
provides funding assistance to address local housing and community development needs.
Annexations
1. Since 1996, Farmersville has successfully annexed approximately 193 acres of land into the
City, with two annexations totaling 37 acres annexed in 1999, one annexation totaling 55
acres in 2000, and three annexations totaling 101 acres in 2004. All annexations have
occurred within the City’s UDB and SOI, with the exception of the most recent annexation,
which was outside the boundary of the City’s UDB, but within the City’s SOI.
Potential SOI Updates
1. The City has expressed interest in expanding its SOI to include areas north of the SR
198/Farmersville Boulevard interchange, as this is an ideal area for a warehousing or similar
industrial operation, or highway commercial type uses, due to its prime access to SR 198.
The land is currently within the City’s UAB, but outside the City’s UDB and SOI.
2) Infrastructure Needs and Deficiencies
Planning Documents
1. The Farmersville GPU outlines comprehensive goals, objectives, and action plans related to
the infrastructure of the City. As prescribed by GPU policy, new development shall be
required to install water, sewer and storm drainage improvements to serve their needs.
2. The GPU recommends that the City’s water, sewer, and storm drainage development impact
fees be reviewed annually, focusing on the relationship between the amount of fees being
collected and the future capital needs of each system based on development trends. Any
modifications to the City’s development impact fees should be in accordance with Assembly
Bill 1600, which requires a clear relationship between fees and their purpose. City officials
indicated that new impact fees will be in place by January 2006.
3. The Community Infrastructure Study (December 1998) serves as an interim update to the
City of Farmersville Storm Drain Master Plan (1989), the City of Farmersville Sanitary
Sewer Master Plan (1983), and the City of Farmersville Water System Master Plan (1993).
Information contained in the study was to be incorporated into a City Infrastructure Master
City of Farmersville MSR Page 2-2
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
Plan to be considered for adoption by the City Council. The City should continue to pursue
the adoption of an Infrastructure Master Plan, if not already in place.
4. City staff indicated that a 5-year capital improvement program (CIP) is being prepared, but is
unsure when it will be completed.
Water
1. The City’s Water System Master Plan (1993) found the City’s water supply system to have
inadequate standby capacity, and inadequate firm capacity. As stated in the Community
Infrastructure Study, no supply capacity improvements to the City’s water supply system
have been completed since 1993.
2. Although it is likely that any development within the City’s UDB or SOI would likely rely on
City infrastructure, a determination of water system adequacy to support any such
developments cannot be made at this time.
3. The City should continue to work with developers, and land owners in the area who would be
willing to donate land for construction of new wells to improve the City’s water supply
system.
4. Improvements to the City’s water system have been significantly delayed due to limited
financial resources. The City should continue to pursue and apply for community
development block grants (CDBG) to construct necessary improvements to their water
system to help support a growing population. City officials indicated that a CDBG was
received to install a new well and generator.
Sanitary Sewer
1. Recent improvements to the City’s sanitary sewer system improved the ability of the system
to support development west of Virginia Avenue, north of Visalia Road, and north of Avenue
288 (Walnut Avenue).
2. The City’s WWTF operates under the provisions of Order No. 86-152, which prescribes a
maximum 30-day average daily dry weather discharge flow of 1.25 MGD. The current
ADWF into the WWTF is approximately 930,000 GPD.
3. City staff indicated that the WWTF currently has a reserve capacity of approximately
300,000 gallons per day, which could support an estimated 1,280 equivalent single family
dwellings, or a population of approximately 14,720.
4. It is likely that the City’s WWTF will need to be improved to increase capacity to support
growth through year 2025. The City should allocate necessary funding to program
improvements to the WWTF. City staff indicated that the City is presently planning to build
a new secondary treatment facility.
Storm Drain
1. The City has a Master Planned storm drain system that is anticipated to meet drainage
infrastructure needs to accommodate future growth. The City completed several storm
City of Farmersville MSR Page 2-3
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
drainage improvements along Linnel Avenue, Ash Street and Petunia Street through CDBG
funding. In addition, the storm drain basin along Petunia Street is being expanded.
2. As indicated in the Community Infrastructure Study, Deep Creek has significant capacity
available (in the order of 20-30 cfs) to accommodate future storm runoff. The Consolidated
People’s Ditch Company has no capacity in their ditches to take on additional storm runoff.
3. With the exception of existing deficiencies, it is anticipated that most future storm drainage
improvements would be development driven. The City should work with developers to
construct on-site drainage facilities when feasible.
Streets and Roads
1. The primary limitation of the City’s transportation system is the lack of railroad crossings.
Both the GPU and the Community Infrastructure Study identify the need to construct
additional railroad crossings to improve the City’s transportation system. The railroad
company in the area has not been sympathetic to the idea of constructing new crossings. City
staff indicated that they are in the process of securing one more crossing between Road 156
and Farmersville Boulevard.
2. The GPU indicates that funds for street improvement projects would come from gas tax and
transportation funds. The circulation element also recommends that the City develop a traffic
impact fee for new development in Farmersville, consistent with the requirements of AB
1600.
3. The GPU recommends that the City explore the merits of establishing a dial-a-ride service for
the elderly, handicapped, and others who may not have access to transportation. The City of
Visalia, as of November 2004, expanded its bus system to service to Farmersville, providing
needed public transportation in the City.
4. There are currently no established bike lanes in Farmersville however the City has been
participating with the Tulare County Association of Governments in the preparation of a bike
plan for Tulare County and its Cities. The plan designates bike routes on Visalia Road,
Farmersville Boulevard, Walnut Avenue, and Avenue 296. The City’s Circulation Element
requires the installation of bike lanes on specified roadways as a condition of new
development.
Public Safety
1. Farmersville police and fire departments are operated with revenues allocated from the City’s
general fund.
2. The City of Farmersville has one full time firefighter that operates the only fire station in the
City. The remaining fire rescue crew consists of volunteers.
3. The Police Department is staffed with 14 sworn officers and one non-sworn position. One
additional position is planned for hire in January 2006.
4. In 2004, Farmersville passed Measure U, a ½ cent sales tax increase, a portion of which
revenues will be used to partially ensure essential government functions, including police,
City of Farmersville MSR Page 2-4
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
fire and other general fund services will continue in the future, providing a supplement to
existing general fund revenues.
5. Measure G, on the November 2005 ballot, would have imposed a 4% utility users tax for the
purpose of general government services including animal control, park maintenance, and
public safety. Measure G was not passed by the voters. The City should consider preparing a
comprehensive plan for expanding public safety services within the City.
6. Fire flow pressure ratings passed the last inspections (with a grading class five). A new well
is scheduled for drilling for 2006-07 fiscal year through CDBG funding, which will improve
the water supply system to ensure that standard levels of fire flow pressure can be met.
7. The City’s sworn police officer to population ratio is approximately 1:735, compared to a
desirable ratio of 1:800.
8. The City currently receives $100,000 per year in State funding for two police officer
positions. The City should have a plan in place to fund these positions with local dollars at
the conclusion of the grant funding period.
9. Consistent with goals set forth by the City’s GPU, the police department implements
innovative programs that promote an efficient delivery system including a volunteer program,
take-home car program, and K-9 unit program. The City has two volunteer teams with plans
for expansion to three teams.
3) Financing Constraints and Opportunities
1. The City’s budget clearly describes the services provided by the City to its residents and the
funds expended for those services, although in recent years, the City has struggled to reach a
balanced budget. The City adopted its fiscal year 2004-05 budget on October 25, 2004.
2. The City’s budget for fiscal year 2004-05 was adopted with the anticipation of the passage of
two local measures, U and V, a ½ cent sales tax increase, and a 4% utility user’s tax,
respectively. Since only Measure U passed, the City was forced to adjust its services to
balance its budget in light of funding constraints. In the November 2005 election, Measure
G, which would have imposed a 4% utility user tax, was unsuccessful.
3. Following the November 2004 elections, the City Manager of Farmersville announced his
resignation. The City indicated that in the meantime, they will have to get by with current
staff, and have no immediate plans to fill the City Manager position. Rene Miller, the finance
director of the City has been named acting City Manager.
4. The City’s current financial constraints stem from the leakage of local sales tax dollars to the
nearby Cities of Visalia and Exeter. The City should attempt to reverse the leakage of sales
tax dollars to surrounding Cities by working to attract new retail establishments to the City,
retaining existing businesses, and maintaining high standards that create an attractive
business climate which is inviting to prospective new businesses.
5. The City has opportunities to enhance tax increment revenues by encouraging development in
the redevelopment district. The City should consider the reduction of development impact
City of Farmersville MSR Page 2-5
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
fees, and higher residential densities in the redevelopment district in order to encourage infill
development.
6. The City should continue to actively pursue State and Federal grants to expand and improve
its current infrastructure and attract new businesses. The redevelopment agency should, on
behalf of existing companies or companies interested in locating in Farmersville, apply for
State or Federal grants that assist companies with off-site improvements, purchase of land or
equipment or training of employees.
7. Likely fiscal benefits to the City from development within the SOI could include modest
levels of property tax collections from residential land development (upon annexation of the
land), potential transient occupancy tax revenues from new recreational land uses, and sales
tax revenues where retail/commercial uses are developed. Likely fiscal costs to the City
would typically include public maintenance of infrastructure completed for new projects in
the SOI, and the provision of public safety services.
8. Farmersville’s development impact fees should be updated to ensure that new uses pay their
fair share of the costs of providing infrastructure and services, while remaining competitive
with other Cities and surrounding communities. City staff indicated that new impact fees will
be in place by January 2006. The City is also having a capital improvement program
prepared, but is unsure when it will be completed.
9. The City recognizes the need to overcome significant financial constraints, and continues to
develop strategies to enhance current revenue streams. An example would be the passage of
Measure U in 2004, a ½ cent increase in local sales tax, revenue that is to be used to partially
ensure essential government functions, including police, fire, and other general fund service
will continue in the future. The City should continue efforts to pass a utility users tax to
supplement general fund revenues.
10. Farmersville is currently only one of two City’s in Tulare County that does not have a utility
user tax, the other being Visalia, which has the largest sales tax base in the County. For all
other City’s in Tulare County, the utility user tax has become a stable source of revenue to
fund general government services.
4) Cost Avoidance Opportunities
1. Master planned infrastructure helps the City in avoiding unnecessary costs through effective
planning and implementation policies, and help eliminate overlapping and/or duplicative
services.
2. The City can avoid unnecessary up front costs of extending infrastructure to undeveloped
areas by promoting effective growth management practices. The City should first promote
development within infill areas, and areas where infrastructure is already in place.
3. The City has opportunities to avoid unnecessary costs through the construction of joint use
projects including recreational facilities, parks, or a museum (in coordination with Tulare
County).
4. The City could avoid unnecessary costs associated with maintaining infrastructure through
the formation of homeowners associations within residential developments for larger scale
City of Farmersville MSR Page 2-6
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
residential developments or condominiums where shared (community) facilities such as
playgrounds, parks, gyms, or swimming pools are present.
5. The City should review its investment practices to avoid unnecessary costs associated with
losses (or shortfalls) on investment earnings. The City’s investment policy only allows for
Local Agency Investment Fund (LAIF) or Treasury Bills (T-Bills) investments.
5) Opportunities for Rate Restructuring
1. The City has in-place development impact fees, connection fees, reconnection fees, and
monthly user fees which are utilized to expand and maintain the City’s infrastructure systems.
2. City staff indicated that new impact fees will be in place by January 2006. The City is also
preparing a capital improvement program, but is not sure when it will be completed. Capital
improvement programs prioritize capital infrastructure needs in line with development
demands, and within available funding.
3. The City should annually review utility user fees to ensure that rates are keeping pace with
inflation, construction costs, and cost of living indexes. Utility user fees are to be used for
operation and maintenance of existing facilities, and not for the construction of new
infrastructure.
4. Monthly rates for sanitary sewer service in Farmersville are slightly above average compared
to other Cities in Tulare County, while the City’s fee for a new sanitary sewer connection is
among the lowest.
5. The City of Farmersville should work to implement goals and policies outlined in the general
plan, as it establishes effective goals and policies with regard to the City’s financial structure.
6. The City of Farmersville should work to comply with the requirements of GASB 34 to
improve the financial reporting of the City.
6) Opportunities for Shared Facilities
1. Based upon previous research, the City of Visalia voted to expand its public transportation to
service Farmersville.
2. Farmersville also has mutual aid agreements with surrounding jurisdictions to provide fire
and emergency support services. City officials indicated that the City’s public safety force
responds to areas outside of the City more often than others respond to the City for assistance,
and that Farmersville Fire responds out into the County to assist on an almost 2 to 1 basis.
3. The City’s general plan prescribes several opportunities for the City to share facilities and
resources in the future.
4. As prescribed by the Farmersville General Plan, the City has opportunities to work with the
Cities of Visalia and Exeter, and Tulare County to establish greenbelts to prevent the Cities
from physically growing together. This would also help to preserve prime agricultural land
within the County.
City of Farmersville MSR Page 2-7
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
5. The City should work with Tulare County to resolve mutual planning issues associated with
the Linnel Farm Labor Center, and the Cameron Creek Colony. The Linnel Farm Labor
Center, the Cameron Creek Colony, and the City could potentially share a single wastewater
treatment facility.
6. The City should continue to look for opportunities to work with surrounding jurisdictions and
agency’s, and cooperatively address mutual planning issues.
7) Government Structure Options
1. Since development of properties within the SOI generally relies on Master Planned
infrastructure available from the City, it is logical for the City to assume the lead in planning
for these sites.
2. Coordinated infrastructure plans, for development within the SOI area, submitted with
specific annexation requests would create a checks and balance system for incorporating
lands into the City while promoting improvements to impacted adjacent County land.
3. The City’s ability to effectively provide services to SOI areas appear to be limited primarily
by financial resources. For this reason, it is likely that developers would be responsible for
construction the infrastructure to accommodate such development. Requiring the preparation
of Specific Plans for development within the City’s SOI could help identify funding
mechanisms, and infrastructure needs to better serve such development.
4. City officials have indicated that the financial picture has and continues to change.
Additional growth would also aid in expansion of services through impact fees and additional
sales tax revenue.
5. There are no foreseeable boundary conflicts with surrounding Cities or special districts that
would affect the current governmental structure of Farmersville.
8) Evaluation of Management Efficiencies
1. The City of Farmersville operates under the council-manager form of government. The
Farmersville City Manager resigned on November 3, 2004 due to the City’s financial
hardships. Rene Miller, Farmersville’s finance director, was named acting City Manager.
The City has no immediate plans to fill the City Manager position.
2. It is likely that the City’s management efficiencies would improve through increased City
revenue streams. Increased revenue streams could be accomplished through promoting
economic development in the City, and seeking State and Federal grant/loan money that can
be used for government operations.
9) Local Accountability and Governance
1. The City complies with the Brown Act, holding regular City Council meetings on the second
and fourth Monday of each month at 7:00 p.m. in City Hall Council Chambers.
2. Farmersville is the only City within Tulare County that does not have an established website.
The development of a website could help the City attract new businesses, enhance public
City of Farmersville MSR Page 2-8
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
access to information, and improve community involvement in City activities. City officials
have indicated that there are plans to implement a website in the near future.
3. The preparation and distribution of a regular newsletter would also help keep the community
informed on the current events of the City.
4. The City could gain a better understanding of the needs of the community by conducting an
annual (or bi-annual) public opinion survey.
City of Farmersville MSR Page 2-9
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.0 CITY OF FARMERSVILLE
2.0.1 Background
In July 2003, the Tulare County Local Agency Formation Commission (LAFCO) Board adopted a
Municipal Service Review (MSR) exemption policy, which identifies the agencies that would be subject
to a review and the extent of that review. The agencies in Tulare County were divided into three (3)
categories: agencies subject to a full comprehensive study; agencies subject to a questionnaire study; and
agencies exempt from a MSR study. The MSR exemption policy further identifies that the services
subject to review shall be:
• Police protection
• Fire protection
• Water and wastewater
• Solid waste collection and disposal
• Streets and traffic circulation
• Power generation and distribution
• Health Care
It should be noted that due to the unique nature of healthcare, review of this service has been specifically
excluded from this report. Power generation and distribution is provided by privately owned utility
companies. The Southern California Edison (SCE) Company serves most of the Cities within Tulare
County, including Farmersville. The City is contracted with Allied Disposal for solid waste collection
and disposal services, including recycling services. Review of the services provided by privately owned
and operated utility companies is outside the scope of this MSR.
The City of Farmersville operates under the Council-Manager form and government, and provides the
following services that are subject to a municipal service review: public safety (police and fire
protection), highways and streets, wastewater collection, treatment, and disposal, domestic water, and
storm drainage.
The City of Farmersville, incorporated in 1960, is located in Tulare County in the central southern portion
of the San Joaquin Valley. It is located on the south side of SR 198, a major east-west highway that
serves the central valley region. Farmersville is five miles east of Visalia, two and a half miles west of
Exeter, and ten miles northwest of Lindsay.
The San Joaquin Valley is considered by the American Farmland Trust as the most threatened agricultural
region in the County. Against a backdrop of high unemployment, low incomes, and distrust between
various segments of the community, the Farmersville City Council undertook its General Plan Update
through the year 2025. After two and a half years of public involvement, the City adopted policies that
will maximize the efficient use of land and ensure that Farmersville remains separate from neighboring
communities. The Farmersville General Plan Update (Collins & Schoettler Planning Consultants,
September 2002) uses innovative features and smart growth planning techniques that addresses the City’s
high unemployment rate. The plan also calls for establishing a farmland impact fee that will be assessed
against new development. Funds will be used to purchase agricultural easements on prime farmland
outside the City’s borders.
City of Farmersville MSR Page 2-10
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
The following discussions address the nine legislative factors required by the Cortese-Knox-Hertzberg
Act; 1) Growth and population, 2) Infrastructure needs and deficiencies, 3) Financial constraints and
opportunities, 4) Cost avoidance opportunities, 5) Opportunities for rate restructuring, 6) Opportunities
for shared facilities, 7) Government structure options, 8) Evaluation of management efficiencies, and 9)
Local accountability and governance.
City of Farmersville MSR Page 2-11
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.1 GROWTH AND POPULATION
The purpose of this section is to present historical and projected growth patterns and population
projections to establish a baseline for the evaluation of service needs. This section provides a summary
and analysis of historical data, current planning boundaries, current and projected land use needs, land
annexations and potential SOI updates.
2.1.1 Historical Data
Based upon Census 2000 data, the City of Farmersville had an incorporated land area of approximately
1.9 square miles, a total population of 8,737, and 2,269 housing units. Historical Census data indicates
that the City of Farmersville had a 1990 population of 6,233 which grew to a population of 8,737 by the
year 2000, corresponding to an average annual population growth rate of approximately 3.4%, the highest
of all City’s within Tulare County. The Farmersville General Plan Update (Collins & Schoettler
Planning Consultants, September 2002) estimates a build-out population between 17,854 and 20,155,
estimated to occur by year 2025. The plan’s “low” population projection is based on Farmersville’s
average annual growth rate from 1980 to 2000 (2.9%), while its “high” population projection is based on
the average annual growth rate from 1990 to 2000 (3.4%). The General Plan Update provides a land
needs evaluation for a projected year 2025 build-out population of 17,854. To remain consistent with the
General Plan Update, for analysis purposes a population of 17,854 will be used as the year 2025 service
population for the City. Based upon data obtained from the California Department of Finance, as of
January 1, 2005, Farmersville had a population of approximately 10,240, corresponding to an annual
average growth rate of approximately 3.3% between 2000 and 2005.
Census 2000 data also indicates that the average dwelling unit occupancy rate for the City is
approximately 4.1 persons per household, which is significantly higher than the County average of 3.3
persons per household. Over 70% of the Farmersville population is of Hispanic decent.
2.1.2 Current Boundaries
The current City Limit Boundary and the currently adopted SOI for the City of Farmersville are illustrated
on Figure 2-1. The following excerpt from the Tulare County LAFCO website
(www.co.tulare.ca.us/lafco/info.asp) defines a SOI and the purpose it serves.
A “Sphere of Influence” is the physical boundary and service area that a local
governmental agency is expected to serve. Establishment of this boundary is necessary to
determine which governmental agencies can provide services in the most efficient way to
the people and property in any given area. The Sphere of Influence requirement also
works to discourage urban sprawl by preventing overlapping of jurisdictions and
duplication of services.
City of Farmersville MSR Page 2-12
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
FIGURE 2-1 – FARMERSVILLE CITY LIMITS AND SPHERE OF INFLUENCE
Source: Tulare County GIS Database (July 2004)
City of Farmersville MSR Page 2-13
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
In addition to City Limits, and a City’s SOI, additional boundaries are typically adopted to guide the
planning process, including an Urban Area Boundary (UAB), and Urban Development Boundary (UDB).
The General Plan Update identifies the following planning boundary definitions, as defined by Tulare
County’s Urban Boundaries Element:
UAB – “ … the areas where land uses are presumed to have an impact on the adjacent incorporated City,
and within which the Cities’ concerns are to be given serious consideration as part of the land use review
process. The urban area is considered to be the next logical area in which urban development may occur
and the area within which Urban Development Boundaries may ultimately be expanded.”
UDB – “ … a 20-year planning boundary within which urban development is expected to occur over the
plan period.”
The UAB and UDB lines were adopted by the City in 1999 and by Tulare County in 2000. The
Farmersville planning area is located within Farmersville’s UAB. A City’s SOI typically lies between a
City’s UDB, and UAB, or, in some cases, may be coterminous with a City’s UDB. Farmersville’s SOI
extends beyond the City’s UDB, and is within the City’s UAB, consistent with current planning boundary
definitions.
Based upon information contained in the Farmersville General Plan Update, in 2002, there was 1,205
acres of land within the City Limits, 1,726 acres of land within the UDB, and 2,952 acres of land within
the UAB. According to the Tulare County GIS database, Farmersville’s SOI contains approximately
2,517 acres of land. Figure 2-2 illustrates the City of Farmersville UDB and UAB (consistent with the
City’s General Plan GIS database) in comparison to the City Limits and SOI (consistent with the
County’s GIS database).
City of Farmersville MSR Page 2-14
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
FIGURE 2-2 – FARMERSVILLE UDB, UAB, SOI & CITY LIMITS
Source: Tulare County GIS Database (July 2004) & City of Farmersville GIS Database (2002)
City of Farmersville MSR Page 2-15
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.1.3 Land Use
Farmersville’s urban area is generally centered along Farmersville Boulevard, the City’s major
north/south roadway. The City’s downtown commercial area is situated along Farmersville Boulevard
generally between Visalia Road and Front Street. Additional commercial areas are located on Visalia
Road, east and west of Farmersville Boulevard and on Farmersville Boulevard, north of Front Street and
south of Visalia Road.
Residential neighborhoods are located throughout the City, with the oldest neighborhoods located around
the intersection of Farmersville Boulevard and Visalia Road. Newer residential development is occurring
in the northwest portion of the City, north and south of Walnut Avenue. The City has experienced a very
limited amount of industrial development; current uses include a nut/fruit drying plant, and a cement
mixing plant. The City’s only industrial park is located along Terry Avenue, west of Farmersville
Boulevard.
Major facilities owned by the City of Farmersville include six neighborhood parks, the Farmersville Civic
Center, a public works yard, two City-operated child care facilities, and the City’s wastewater treatment
plant located southwest of the City.
The City’s General Plan Update provides an excellent tool for guiding future growth in Farmersville.
The plan provides a detailed evaluation of current land use, and projected residential, commercial/office,
industrial, parks, and school land demands to accommodate growth through the year 2025. The General
Plan Update concludes that there is more than enough land within the UDB to accommodate growth to
the year 2025. The General Plan Update (GPU) also notes that City officials consider Farmersville to be
grossly under-developed with commercial and industrial development, as compared to other Tulare
County Cities. As such, the land demand projections should be tempered by that realization. City
officials have more recently indicated that growth and interest in the City have increased dramatically
since the aforementioned information was documented.
According to The California Planners 2005 Book of Lists, Farmersville last updated its General Plan
Housing Element in 2004. State law SB 491 requires that housing elements be updated according to a
schedule set by the Department of Housing and Community Development. All Cities within Tulare
County were required to submit a third revision to their housing element by December 31, 2003. The
fourth revision of the General Plan Housing Element is scheduled for June 30, 2009. To meet the
provisions of current law, and to maintain consistency with the General Plan Update (which includes
updates to the Land Use, Circulation, Conservation, and Open Space Elements), the City adopted a
comprehensive update to their General Plan Housing Element in early 2005 consistent with current
requirements set forth by State law. Proposition 46 provides funding assistance to address local housing
and community development needs.
2.1.4 Annexations
Since 1996, Farmersville has annexed approximately 193 acres of land into the City, with two
annexations totaling 37 acres annexed in 1999, one annexation totaling 55 acres in 2000, and three
annexations totaling 101 acres in 2004. The 37 acres annexed in 2000 included three parcels located at
the southeast quadrant of the SR 198/Farmersville Boulevard interchange. The 55 acres annexed in 1999
included a 9 acre parcel located at the northeast corner of Farmersville Boulevard and Avenue 288, and
28-acres of land located northwest of the Avenue 288/Ventura Avenue intersection. The 101 acres
annexed in 2004 included 23 additional acres of land located near the northwest quadrant of the Avenue
288/Ventura Avenue intersection, 40 acres of land located north of Visalia Road just west of the previous
City Limit Boundary, and 38 acres just west of the previous City Limit Boundary, south of the railroad
City of Farmersville MSR Page 2-15
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
tracks. Figure 2-3 illustrates the areas that Farmersville has annexed into the City since 1999 (no
annexations occurred between 1996 and 1998). As indicated in Figure 2-3, on the following page, all
annexations have occurred within the City’s UDB and SOI with the exception of the most recent
annexation, which was outside the boundary of the City’s UDB, but within the City’s SOI.
City of Farmersville MSR Page 2-16
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
FIGURE 2-3 – LOCATION OF PAST ANNEXATIONS (1999 – 2005)
Source: Tulare County GIS Database & City of Farmersville GIS Database (2002)
City of Farmersville MSR Page 2-17
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.1.5 Potential Sphere of Influence Updates
As previously noted, a LAFCO SOI represents the physical boundary and service area that a local
governmental agency is expected to serve, while a UDB generally represents the area around a City
designed to contain enough land to accommodate 20-years of growth. A City’s SOI should generally
extend beyond, or, in some cases, be coterminous with a City’s UDB, while remaining within a City’s
UAB, which is the case for the City of Farmersville.
The City has expressed interest in expanding its SOI to include areas north of the SR 198/Farmersville
Boulevard interchange, as this is an ideal area for a warehousing or similar industrial operation, or
highway commercial type uses due to its prime access to SR 198. The land is currently within the City’s
UAB, but outside the City’s UDB.
2.1.6 Written Determinations
Historical Data
1. Based upon Census 2000 data, Farmersville had an incorporated land area of approximately
1.9 square miles, a total population of 8,737, and 2,269 housing units.
2. Census 2000 data also indicates that the average dwelling unit occupancy rate for the City is
approximately 4.1 persons per household, which is significantly higher than the County
average of 3.3 persons per household.
3. The Farmersville General Plan Update estimates a build-out population of 17,854,
corresponding to an annual average growth rate of 2.9%, estimated to occur by year 2025.
4. California Department of Finance data indicates that as of January 1, 2005, Farmersville had
a population of 10,240, corresponding to an annual average growth rate of approximately
3.3% between 2000 and 2005.
Current Boundaries
1. A City’s SOI typically lies between a City’s UDB, and UAB, or, in some cases, may be
coterminous with a City’s UDB. Farmersville’s SOI extends beyond the City’s UDB, and is
within the City’s UAB, consistent with current planning boundary definitions. The UAB and
UDB lines were adopted by the City in 1999 and by Tulare County in 2000.
2. The Farmersville General Plan Update indicates that, in 2002, there was 1,205 acres of land
within the City Limits, 1,726 acres of land within the UDB, and 2,952 acres of land within
the UAB. According to the Tulare County GIS database, the Farmersville SOI contains
approximately 2,517 acres of land.
Land Use
1. The City’s General Plan Update provides an excellent tool for guiding future growth in
Farmersville. The plan provides a detailed evaluation of current land use, and projected
residential, commercial/office, industrial, parks, and school land demands to accommodate
growth through the year 2025.
City of Farmersville MSR Page 2-18
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2. The General Plan Update concludes that there is more than enough land within the UDB to
accommodate growth to the year 2025. The GPU also notes that City officials consider
Farmersville to be grossly under-developed with commercial and industrial development, as
compared to other Tulare County Cities. However, City officials have more recently
indicated that growth and interest in the City have increased dramatically since the
aforementioned information was documented.
3. To meet the provisions of current law, and to maintain consistency with the General Plan
Update (which includes updates to the Land Use, Circulation, Conservation, and Open Space
Elements), the City adopted a comprehensive update to their General Plan Housing Element
in early 2005 consistent with current requirements set forth by State law. Proposition 46
provides funding assistance to address local housing and community development needs.
Annexations
1. Since 1996, Farmersville has successfully annexed approximately 193 acres of land into the
City, with two annexations totaling 37 acres annexed in 1999, one annexation totaling 55
acres in 2000, and three annexations totaling 101 acres in 2004. All annexations have
occurred within the City’s UDB and SOI, with the exception of the most recent annexation,
which was outside the boundary of the City’s UDB, but within the City’s SOI.
Potential SOI Updates
1. The City has expressed interest in expanding its SOI to include areas north of the SR
198/Farmersville Boulevard interchange, as this is an ideal area for a warehousing or similar
industrial operation, or highway commercial type uses, due to its prime access to SR 198.
The land is currently within the City’s UAB, but outside the City’s UDB and SOI.
City of Farmersville MSR Page 2-19
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.2 INFRASTRUCTURE NEEDS AND DEFICIENCIES
The purpose of this section is to evaluate the infrastructure needs and deficiencies of the City of
Farmersville in terms of availability of resources, capacity to deliver services, condition of facilities,
service quality, and levels of service. This section provides a summary of the policies and
recommendations with relation to infrastructure, as contained in the GPU. This section also includes a
summary of current infrastructure plans relating to water, sewer, storm drain, streets and roads, and public
safety, including discussions regarding budgetary aspects of improving and expanding such infrastructure.
LAFCO is responsible for determining that an agency requesting an SOI amendment is reasonably
capable of providing needed resources and basic infrastructure to serve areas within the City and its SOI.
It is important that these findings of infrastructure and resource availability are made when revisions to
the SOI and annexations occur. LAFCO accomplishes this by evaluating the resources and services to be
expanded inline with increasing demands. The City of Farmersville currently has no formal proposals to
expand its SOI.
2.2.1 Planning Documents
The Farmersville GPU outlines comprehensive goals, objectives, and action plans related to the
infrastructure of the City. As prescribed by GPU policy, new development shall be required to install
water, sewer and storm drainage improvements to serve their needs. The City’s GPU identifies where
development will occur through year 2025, and is shaped so that it is generally in concert with existing
sanitary sewer, water, and storm drainage Master Plans. Although the plan was shaped around current
Master Planning, it recommends that the current Master Plans be reviewed in order to ensure that they can
properly and efficiently serve future development prescribed by the land use element.
The GPU recommends that the City’s water, sewer, and storm drainage development impact fees be
reviewed annually, focusing on the relationship between the amount of fees being collected for each of
the accounts and the future capital needs of each system based on development trends. Any modifications
to the City’s development impact fees should be in accordance with Assembly Bill 1600, which requires a
clear relationship between fees and their purpose. City officials indicated that new impact fees will be in
place by January 2006. Development impact fees are generally used to implement a City’s capital
improvement program. City staff indicated that a 5-year capital improvement program (CIP) is being
prepared, but is unsure when it will be completed.
The GPU recommends that the Redevelopment Agency prepare a 5-year CIP, and associated developer
impact fees, to assist in the maintenance, rebuilding and upgrading of Farmersville’s infrastructure
systems within the redevelopment project area.
In addition to the GPU, the City has provided a Community Infrastructure Study (Quad Knopf, December
1998), a Sanitary Sewer Master Plan (Quad Knopf, January 1983), and a Water System Study (Quad
Knopf, July 2000). The Community Infrastructure Study (December 1998) serves as an interim update to
the City of Farmersville Storm Drain Master Plan (1989), the City of Farmersville Sanitary Sewer Master
Plan (1983), and the City of Farmersville Water System Master Plan (1993). Information contained in
the study was to be incorporated into a City Infrastructure Master Plan to be considered for adoption by
the City Council. The City should continue to pursue the adoption of an infrastructure master plan, if not
already in place. The contents of these Plans/Studies are summarized in the following sections.
City of Farmersville MSR Page 2-20
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.2.2 Water
The City’s water distribution system consists of a grid network of about 25 miles of asbestos cement (AC)
and polyvinyl chloride (PVC) pipeline with sizes ranging from 4-inches to 12-inches. The distribution
system has numerous valves and fire hydrants throughout. The supply needs of the system are met by six
deep well turbine pumps; individual pump output varies from a low of 413 gallons per minute to a high of
1,104 gallons per minute. The wells are fairly uniformly disbursed throughout the City and are controlled
by pressure switches and hydro-pneumatic tanks. Pressure switches are set to turn pumps on when the
pressure drops to 32 psi and off when it rises to 80 psi. Two of the wells have 10,000 gallon hydro-
pneumatic tanks, and four have 5,000 gallon hydro-pneumatic tanks, resulting in a total storage capacity
of 40,000 gallons. The depth of the wells ranges from approximately 280 to 410 feet, with a static
groundwater level between 50 and 65 feet below ground surface. Three of the six wells have standby
emergency generators to operate the pumps when power outages occur. The system was initially
constructed in 1955, and has been operated, maintained and expanded by the City of Farmersville since
1960. In addition to the six operational wells, the City also has one well, near the southwest corner of
Front Street and Magnolia Avenue, which has been abandoned and is no longer in service.
In May of 1993, the City of Farmersville adopted a Water System Master Plan (May 1993) to serve as the
guiding document for the City’s water system expansion and maintenance. In December 1998, the City
had a Community Infrastructure Study prepared for the purposes of establishing the conditions of and
planning for improvements to the existing storm drainage system, sewage collection and treatment
system, water supply and distribution system, and the street system. Both the Master Plan and the
Community Infrastructure Study recommend the addition of wells and pipelines at various City locations,
in order to improve the distribution patterns and pressures of the existing water supply system.
The 1993 Water System Master Plan evaluated the adequacy and reliability of the City water supply
system by determining if the system had reliable standby capacity and adequate firm capacity. The
Master Plan considered the City of Farmersville water supply system to have inadequate standby capacity
because the system could not supply the average daily flow rate with only two of the three wells that have
standby power generators. Similarly, the system was considered to have inadequate firm capacity
because it was not capable of supplying the peak hour flow rate or the peak daily flow rate plus fire flow
rate with only four of the six wells in operation. Based on the above system deficiencies, the Master Plan
estimated that by the year 2000 the City would require three additional wells for its water supply system.
In July 1999, the City requested funds from the Department of Housing and Community Development
(CDBG Application, 7/99) – Community Development Block Grant to accomplish the planning, technical
analysis, and preliminary engineering design of new wells and pipelines for the water supply system. A
Water System Study was prepared for the City of Farmersville by Quad Knopf, Inc. once funding was
secured. The study was undertaken to determine the need for, and location of a new well for the City of
Farmersville water system. In addition, the study evaluates what other improvements, if any, are required
to improve the system adequacy and reliability. The following excerpt is from the Water System Study
(Quad Knopf, July 2000),
“Since 1993 the supply of water to Farmersville has not been augmented. In fact, it
appears that each of the existing wells supply less water than before because they have
developed deeper drawdowns as a result of a deeper regional water table. However, the
City water demand has increased due to population growth, and expansion of the water
distribution grid.”
City of Farmersville MSR Page 2-21
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
The Water System Study found the current system adequacy and reliability to be “marginal”; and that low
pressures result in the north portion of the City under extreme or critical operating conditions. The study
made further determinations with regard to the City’s water system as follows,
• A new well is required.
• The tentative location of the new well (at Walnut Avenue and Ventura Avenue, on site to be
donated by a developer) is satisfactory.
• Emergency standby power should be furnished at another, existing well.
• Additional pipeline connections (three) should be made between the northern and southern
portions of the water system, under the railroad tracks bisecting the City.
Based upon discussions with the City of Farmersville Public Works Department, installation of the above
improvements is still in planning and design stages, and has been delayed due to financial constraints.
The total estimated cost for a new well, installation of an emergency power unit at existing well, and new
pipeline connections was estimated at $440,000 in July 2000. City officials have indicated that a
Community Development Block Grant was received for the installation of a new well and generator.
The City has two funds set up for maintaining and expanding its water system infrastructure; the Water
Utility Fund, which includes funds generated from user fees, reconnection fees, and investment earnings
which are used for the operation and maintenance of the current water system; and the Water
Development Fund, which includes funds generated from developer fees and interest income which are
used for the construction of capital improvements.
2.2.3 Sanitary Sewer
Based upon information contained in the Community Infrastructure Study (Quad Knopf, December
1998), the City’s sanitary sewer infrastructure consists of over 16 miles of collection lines with sizes
ranging from 6-inches to 18-inches. Three pump stations are located in the system; one located at
Oakview Avenue/Ash Avenue, one at Yew Street/Susan Avenue, and one at Ventura Avenue/ Petunia
Street. The sewage collection system generally consists of two main systems: one system lying east of
Deep Creek, and the other situated west of Deep Creek. Connection of the two systems is at the
intersection of Tulare Avenue and Shasta Street. The majority of the collection system was installed in
1969. The balance was installed by land developers to serve new subdivisions.
As outlined in the Community Infrastructure Study, the primary limitation of the existing system was the
lack of capacity for future development (a) west of Virginia Avenue and north of Visalia Road, and (b)
north of Avenue 288 (Walnut Avenue). This need has been partially addressed by the recently installed
18” trunk line along the Virginia Avenue alignment, from Visalia Road to the treatment plant. However
to fully utilize this line, a major force main/trunk line project was needed. Without the major project, new
development of housing, industrial and commercial in these areas would have been severely limited. The
Community Infrastructure Study recommended the following sanitary sewer collection system
improvements be constructed as a part of the major force main/trunk line project:
• Phase I – Install 15-inch gravity line along Walnut Avenue, from Farmersville
Boulevard westerly to a new pump station to be located approximately ¼ mile west
Ventura Avenue. From the pump station, a force main would be extended southerly
to Visalia Road and discharged into the trunk line installed along Virginia Avenue.
• Phase II – Install a trunk line northerly along Farmersville Boulevard, from Walnut to
Terry Avenue.
City of Farmersville MSR Page 2-22
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
• Phase III – Install a trunk line northerly along Farmersville Boulevard, from Terry
Avenue to SR 198.
• Phase IV – Install a trunk line ½ mile easterly from Farmersville Boulevard along
Walnut Avenue.
Based upon discussions with the City of Farmersville Public Works Department, the improvements
outlined above have been constructed, and are currently operating. Phase I provided the backbone system
for all future development in the area, phase II allows for sewer service to the existing industrial area, as
well as to existing housing, and for future development in the area, phase III allows for new industrial and
commercial development at the northerly end of Farmersville Boulevard, including the SR 198
intersection, and phase IV allows for future development in the area near the high school site.
The City’s current wastewater treatment facility (WWTF) – a primary treatment facility – occupies
approximately 40 acres located about a mile south of Visalia Road. The WWTF consists of headworks,
metering station, pumps, three mechanically aerated treatment ponds, and ten evaporation/percolation
ponds with a total surface area of approximately 27 acres. Although the City owns 4 acres of land,
adjacent to the treatment facility, which is available for irrigation (use of reclaimed water), it has not been
necessary in recent years to discharge any effluent from the evaporation/percolation ponds for irrigation.
The entire treatment/disposal system is relatively well maintained; the evaporation /percolation ponds are
periodically, in rotation, drained and bottom-ripped to maintain disposal capacity.
Based upon information contained in the Wastewater User Charge Survey Report FY 2004-05 (Cal EPA –
State Water Resources Control Board, May 2005), the average dry weather flow at the WWTF is
approximately 930,000 gallons per day (GPD). The City’s WWTF currently operates under the
provisions of Order No. 86-152, issued by the Regional Water Quality Control Board (RWQCB). The
Order prescribes a maximum 30-day average daily dry weather discharge flow of 1.25 MGD. City staff
indicated that the WWTF has reserve capacity for approximately 300,000 GPD, and that there is
sufficient capacity at the WWTF to accommodate an additional 1,280 equivalent single family dwellings
(ESD’s), or an estimated population of approximately 14,720. Based upon these estimates, it is
reasonable to assume that the City will need to construct additional improvements to its WWTF to
increase capacity to accommodate growth through year 2025. City staff indicated that the City is
presently planning to build a new secondary treatment facility.
Based upon information contained in the Community Infrastructure Study, during the early 1980s, the
plant’s disposal facilities could not handle all of the effluent. Several factors contributed to the problem;
the pond bottoms were not regularly dried and ripped; there were fewer ponds available for disposal; the
groundwater level in the area approached or exceeded the level of the pond bottoms. Emergency, pumped,
discharge to Deep Creek was required, despite the objections and concerns of the irrigation district and
regulatory agencies. It is anticipated that, should high groundwater again occur because of prolonged
flow in the adjacent ditches and wet-year rainfall, disposal difficulties may again occur.
In 1994, the City Engineer prepared an analysis of alternatives for long-term treatment and disposal of the
City of Farmersville’s wastewater. The analysis took into account not only the existing capacity of the
City’s facilities but the potential disposal difficulties inherent in the plant location with respect to a
possible recurrence of the high groundwater experienced in the 1980s. Several alternatives were
evaluated including relocation of the WWTF, facility modifications to cope with high groundwater, and
connection to the City of Visalia’s WWTF. Relocation was deemed infeasible, and connection to the City
of Visalia’s system was informally determined by the City Council to be not desirable at that time. As
long as low groundwater conditions prevail, the City may expand the treatment and disposal capacity
City of Farmersville MSR Page 2-23
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
relatively cheaply by building additional, lined, aeration ponds and additional unlined
evaporation/percolation ponds, despite the likelihood of concern by the RWQCB about potential
groundwater contamination from pond leakage long-term. It is evident from past experience that the
City’s plant location mandates the construction and operation of expanded treatment and disposal
facilities, and the modification of existing facilities, which can operate satisfactorily during periods of
normal and above-normal rainfall.
Modifying existing facilities to enable wet cycle compliance with State requirements would require the
following improvements, with an estimated cost of approximately $5,000,000.
• Lining of the existing 27-acres of evaporation/percolation ponds.
• Acquisition of 160 acres of land for crop irrigation, replacing percolation disposal capacity.
It is likely that additional improvements to the City’s WWTF will be necessary to accommodate growth
to year 2025. As stated in the Community Infrastructure Study, with the existing flow to permitted flow
ratio (925,000 GPD/1,250,000 GPD, 74%), and no recent history of permit violations due to high
groundwater, it is unlikely that the City will receive funding for the long-range treatment/disposal
facilities necessary to cope with high groundwater related disposal problems.
The Community Infrastructure Study classifies priorities for the recommended infrastructure projects as
urgent, high, medium, or low. Based upon available information, and discussions with City officials, it
has been determined that the City has constructed all sewer improvement projects classified as either
urgent or high priority. Medium priority projects will be needed when future development demands, or as
remedial work for existing deficiencies or problems. Low priority projects include remedial or other
minor work which is not currently creating serious problems or new construction that is developer driven
or subject to other constraints, railroads for example.
The City has two funds set up for maintaining and expanding its sanitary sewer infrastructure; the Sewer
Utility Fund, which includes funds generated from user fees, reconnection fees, and investment earnings
which are used for the operation and maintenance of the current sewer system; and the Sewer
Development Fund, which includes funds generated from developer fees and interest income which are
used for the construction of capital improvements.
2.2.4 Storm Drainage
A comprehensive analysis of the City of Farmersville storm drain system is contained in the Community
Infrastructure Study. The Community Infrastructure Study references the City of Farmersville Storm
Drain Master Plan from 1989. Since the Community Infrastructure Study is more recent, it will be used
as the basis for the discussion and evaluation presented in this section.
The Farmersville storm drain system is similar to that of other Tulare County communities; a combination
of surface drainage facilities and underground gravity flow pipelines. The two primary points of
discharge are the Consolidated Peoples’ Ditch Company’s Extension Ditch and Deep Creek. The City’s
storm drain infrastructure is categorized by twenty six sub-areas, A through Z.
Watercourses within the study area are Cameron Creek, Deep Creek, Extension Ditch, Blain Ditch, Lower
Extension Ditch, Hart-Sweeney Ditch and Sims-Davis Ditch. Except for Cameron Creek, which is
operated by the Tulare Irrigation District, all of the channels are operated by Consolidated People’s Ditch
Company. The Community Infrastructure Study states that CPD and its ditches are currently at or near
capacity and no further discharges could be accepted by the District. Deep Creek is capable of taking
significant discharge increases (in the order of 20-30 cubic feet per second). Discharges to Consolidated
City of Farmersville MSR Page 2-24
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
People’s Ditch Company facilities are governed by an agreement between the Company and the City of
Farmersville.
The Storm Drain Master Plan (1989) identifies remedial work necessary to bring the system up to current
design standards, and additional systems to accommodate future development. The Community
Infrastructure Study identifies the more serious problem areas, and suggests solutions. With regard to
storm drainage improvements, the Community Infrastructure Study identifies one “urgent priority”
improvement, one “high priority” improvement, and several medium and low priority projects. With the
exception of existing deficiencies, it is anticipated that most future storm drainage improvements would
be development driven.
The City’s Storm Drain Master Plan was adopted in 1989 therefore the City should periodically review its
current Master Plan in line with projected growth, and determine an appropriate schedule for updating it.
The City should continue to implement storm drainage improvements as outlined in the Storm Drain
Master Plan and the Community Infrastructure Study, as these documents provide for an excellent guide
in the improvement and expansion of the City’s current system.
The City completed several storm drainage improvements along Linnel Avenue, Ash Street, and Petunia
Street with CDBG funding. In addition, the storm drainage basin along Petunia Street is being expanded.
The City has one fund set up for maintaining and expanding its storm drain infrastructure; the Storm
Drain Fund, which includes funds generated from user fees, and investment earnings which are used for
the operation, maintenance, and expansion of the current storm drain system. The Storm Drain Fund is
anticipated to have an ending fund balance of $67,336 at the end of fiscal year 2004-05. There was no
funding allocated for storm drain infrastructure improvements for fiscal year 2003-04 or fiscal year 2004-
05. The City should consider implementing a storm drain developer impact fee to fund expansions to the
City’s storm drain system.
2.2.5 Streets and Roads
The City street system is fairly simple, with Farmersville Boulevard acting as the only north-south major
arterial. It extends through the entire town, and to the SR 198 interchange. Visalia Road has been the
primary east-west arterial for some time. Due to recent developments along and/or near Walnut Avenue,
it is developing into a major east-west collector facility. There are currently two signalized intersections
in Farmersville, Farmersville Boulevard/Visalia Road and Farmersville Boulevard/Walnut Avenue. No
improvements to the above intersections are anticipated to maintain acceptable levels of service through
the current planning period to year 2025. Major roadways in the City of Farmersville include SR 198,
Farmersville Boulevard, Visalia Road, and Walnut Avenue. As identified in the GPU, it will be necessary
to install traffic signals at the following intersections sometime during the planning period.
• Intersections at SR 198/Farmersville Boulevard interchange
• Farmersville Boulevard/Ash Avenue
• Farmersville Boulevard/Terry Avenue
Both the Community Infrastructure Study and the GPU identify the need for additional north-south
railroad crossings, as currently Farmersville Boulevard is the only roadway that crosses the railroad tracks
to connect the northern and southern portions of the City. This forces residents of neighborhoods on both
sides of the tracks to “funnel out” onto Farmersville Boulevard to gain access to the other side of the City.
Additional connections across the railroad tracks would strengthen the circulation system in several ways
including reducing traffic on over burdened streets, reducing trip lengths, reducing air pollution and fuel
consumption, and enhancing emergency vehicle access in the City. The Community Infrastructure Study
City of Farmersville MSR Page 2-25
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
identifies three roadways, Ventura Avenue, Rose Avenue, and Brundage Avenue as being logical crossing
points, however, the railroad is not currently sympathetic to additional crossings. As indicated in the
Community Infrastructure Study, future railroad crossings at Rose Avenue and Brundage Avenue could
be developer driven, and funded, and that a future railroad crossing at Ventura Avenue would most likely
be a City funded project. City staff indicated that they are currently in the process of securing one more
crossing between Road 156 and Farmersville Boulevard. There are no urgent, high, or medium priority
transportation projects identified in the Community Infrastructure Study.
The Farmersville GPU identifies several issues for which goals and policies are established. Issues
relating to the City’s circulation system, for which goals, objectives and action plans have been
established include the following.
• Traffic
• Arterials
• Collectors
• Local streets and alleys
• Intersections
• Green streets program
• Street connectivity
• Truck traffic
• Parking
• Transit
• Bike paths and pedestrian pathways
• School routes
The GPU states that the City will program street improvements into its 5-year capital budget to ensure the
specified level of service (LOS) is not exceeded in the City limits. Funds for street improvement projects
would come from gas tax and transportation funds. The GPU also recommends that the City develop a
traffic impact fee for new development in Farmersville, consistent with the requirements of AB 1600.
Farmersville is the only City in Tulare County without a public transit service. There is a bus service
provided by Orange Belt stages that provides access to other California Cities. In addition, the City of
Visalia recently (as of November 2004) expanded its bus system to service Farmersville. The GPU
recommends that the City explore the merits of establishing a dial-a-ride service for the elderly, youth,
handicapped, and others who may not have access to transportation.
There are currently no established bike lanes in Farmersville however the City has been participating with
the Tulare County Association of Governments (TCAG) in the preparation of a bike plan for Tulare
County and its Cities. The plan designates bike routes on Visalia Road, Farmersville Boulevard, Walnut
Avenue and Avenue 296. The City’s Circulation Element requires the installation of bike lanes on
specified roadways as a condition of new development.
The City has the following funds set up for transportation improvements:
• Surface Transportation Fund
• Gas Tax Fund
• Transportation Fund (LTF)
• Traffic Congestion Relief Fund (AB 2928)
City of Farmersville MSR Page 2-26
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.2.6 Public Safety (Fire & Police)
The GPU identifies goals, objectives, and action plans related to the City’s public safety services. To
promote a safe community that is free of crime and fire hazards, new developments should be designed
such that crime and fire safety are considered during the City’s site plan review process. Members of the
Farmersville Police and Fire Departments are active participants in the City’s site plan committee that
reviews every new site plan submitted. In order to maintain adequate levels of fire protection safety, a
City’s water system needs to have adequate water supply and pressure to meet fire flow requirements. As
stipulated in the GPU, buildings over 5,000 square feet in size shall be required to have a fire sprinkler
system installed. As previously discussed, the City will need to upgrade its water system with an
additional well in the near future in order to meet increased demand, and pressure regulations. City staff
indicated that a new well is scheduled for drilling in fiscal year 2006-07 through CDBG funding.
The City of Farmersville currently has one full time firefighter that operates the only fire station in the
City. The remaining fire rescue crew consists of volunteers. Fire flow pressure ratings passed the last
inspections (with a grading class five). The GPU recommends that the City amend its development
impact fee schedule to provide funds for the replacement of old water lines, and to provide funds for
future water facilities. A new well is scheduled for drilling for 2006-07 fiscal year through CDBG
funding, which will improve the water supply system to ensure that standard levels of fire flow pressure
can be met.
The Farmersville Police Department is staffed with 14 sworn officers and one non-sworn position. One
additional position is planned for hire in January 2006. The City’s sworn police officer to population
ratio is approximately 1:735, compared to a desirable ratio of 1:800. The City currently receives
$100,000 per year in State funding for two police officer positions. The City should have a plan in place
to continue to fund these positions with local dollars at the conclusion of the grant funding period.
In 2004, Farmersville passed Measure U, a ½ cent sales tax increase, a portion of which revenues will be
used to partially ensure essential government functions, including police, fire and other general fund
services will continue in the future, providing a supplement to existing general fund revenues.
Measure G, on the November 2005 ballot, would have imposed a 4% utility users tax for the purpose of
general government services including animal control, park maintenance, and public safety. Measure G
was not passed by the voters. The City should consider preparing a comprehensive plan for expanding
public safety services within the City. Consistent with goals set forth by the City’s GPU, the police
department implements innovative programs that promote an efficient delivery system including a
volunteer program, take home car program, and K-9 unit program. The City has two volunteer teams
with plans for expansion to three teams.
2.2.7 Written Determinations
Planning Documents
1. The Farmersville GPU outlines comprehensive goals, objectives, and action plans related to
the infrastructure of the City. As prescribed by GPU policy, new development shall be
required to install water, sewer and storm drainage improvements to serve their needs.
2. The GPU recommends that the City’s water, sewer, and storm drainage development impact
fees be reviewed annually, focusing on the relationship between the amount of fees being
collected and the future capital needs of each system based on development trends. Any
modifications to the City’s development impact fees should be in accordance with Assembly
City of Farmersville MSR Page 2-27
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
Bill 1600, which requires a clear relationship between fees and their purpose. City officials
indicated that new impact fees will be in place by January 2006.
3. The Community Infrastructure Study (December 1998) serves as an interim update to the
City of Farmersville Storm Drain Master Plan (1989), the City of Farmersville Sanitary
Sewer Master Plan (1983), and the City of Farmersville Water System Master Plan (1993).
Information contained in the study was to be incorporated into a City Infrastructure Master
Plan to be considered for adoption by the City Council. The City should continue to pursue
the adoption of an Infrastructure Master Plan, if not already in place.
4. City staff indicated that a 5-year capital improvement program (CIP) is being prepared, but is
unsure when it will be completed.
Water
1. The City’s Water System Master Plan (1993) found the City’s water supply system to have
inadequate standby capacity, and inadequate firm capacity. As stated in the Community
Infrastructure Study, no supply capacity improvements to the City’s water supply system
have been completed since 1993.
2. Although it is likely that any development within the City’s UDB or SOI would likely rely on
City infrastructure, a determination of water system adequacy to support any such
developments cannot be made at this time.
3. The City should continue to work with developers, and land owners in the area who would be
willing to donate land for construction of new wells to improve the City’s water supply
system.
4. Improvements to the City’s water system have been significantly delayed due to limited
financial resources. The City should continue to pursue and apply for community
development block grants to construct necessary improvements to their water system to help
support a growing population. City officials indicated that a CDBG was received to install a
new well and generator.
Sanitary Sewer
1. Recent improvements to the City’s sanitary sewer system improved the ability of the system
to support development west of Virginia Avenue, north of Visalia Road, and north of Avenue
288 (Walnut Avenue).
2. The City’s WWTF operates under the provisions of Order No. 86-152, which prescribes a
maximum 30-day average daily dry weather discharge flow of 1.25 MGD. The current
ADWF into the WWTF is approximately 930,000 GPD.
3. City staff indicated that the WWTF currently has a reserve capacity of approximately
300,000 gallons per day, which could support an estimated 1,280 equivalent single family
dwellings, or a population of approximately 14,720.
4. It is likely that the City’s WWTF will need to be improved to increase capacity to support
growth through year 2025. The City should allocate necessary funding to program
City of Farmersville MSR Page 2-28
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
improvements to the WWTF. City staff indicated that the City in presently planning to build
a new secondary treatment facility.
Storm Drain
1. The City has a Master Planned storm drain system that is anticipated to meet drainage
infrastructure needs to accommodate future growth. The City completed several storm
drainage improvements along Linnel Avenue, Ash Street, and Petunia Street through CDBG
funding. In addition, the storm drain basin along Petunia Street is being expanded.
2. As indicated in the Community Infrastructure Study, Deep Creek has significant capacity
available (in the order of 20-30 cfs) to accommodate future storm runoff. The Consolidated
People’s Ditch Company has no capacity in their ditches to take on additional storm runoff.
3. With the exception of existing deficiencies, it is anticipated that most future storm drainage
improvements would be development driven. The City should work with developers to
construct on-site drainage facilities when feasible.
Streets and Roads
1. The primary limitation of the City’s transportation system is the lack of railroad crossings.
Both the GPU and the Community Infrastructure Study identify the need to construct
additional railroad crossings to improve the City’s transportation system. The railroad
company in the area has not been sympathetic to the idea of constructing new crossings. City
staff indicated that they are in the process of securing one more crossing between Road 156
and Farmersville Boulevard.
2. The GPU indicates that funds for street improvement projects would come from gas tax and
transportation funds. The circulation element also recommends that the City develop a traffic
impact fee for new development in Farmersville, consistent with the requirements of AB
1600.
3. The GPU recommends that the City explore the merits of establishing a dial-a-ride service for
the elderly, handicapped, and others who may not have access to transportation. The City of
Visalia, as of November 2004, expanded its bus system to service to Farmersville, providing
needed public transportation in the City.
4. There are currently no established bike lanes in Farmersville however the City has been
participating with the Tulare County Association of Governments in the preparation of a bike
plan for Tulare County and its Cities. The plan designates bike routes on Visalia Road,
Farmersville Boulevard, Walnut Avenue, and Avenue 296. The City’s Circulation Element
requires the installation of bike lanes on specified roadways as a condition of new
development.
Public Safety
1. Farmersville police and fire departments are operated with revenues allocated from the City’s
general fund.
2. The City of Farmersville has one full time firefighter that operates the only fire station in the
City. The remaining fire rescue crew consists of volunteers.
City of Farmersville MSR Page 2-29
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
3. The Police Department is staffed with 14 sworn officers and one non-sworn position. One
additional position is planned for hire in January 2006.
4. In 2004, Farmersville passed Measure U, a ½ cent sales tax increase, a portion of which
revenues will be used to partially ensure essential government functions, including police,
fire and other general fund services will continue in the future, providing a supplement to
existing general fund revenues.
5. Measure G, on the November 2005 ballot, would have imposed a 4% utility users tax for the
purpose of general government services including animal control, park maintenance, and
public safety. Measure G was not passed by the voters. The City should consider preparing a
comprehensive plan for expanding public safety services within the City.
6. Fire flow pressure ratings passed the last inspections (with a grading class five). A new well
is scheduled for drilling for 2006-07 fiscal year through CDBG funding, which will improve
the water supply system to ensure that standard levels of fire flow pressure can be met.
7. The City’s sworn police officer to population ratio is approximately 1:735, compared to a
desirable ratio of 1:800.
8. The City currently receives $100,000 per year in State funding for two police officer
positions. The City should have a plan in place to fund these positions with local dollars at
the conclusion of the grant funding period.
9. Consistent with goals set forth by the City’s GPU, the police department implements
innovative programs that promote an efficient delivery system including a volunteer program,
take-home car program, and K-9 unit program. The City has two volunteer teams with plans
for expansion to three teams.
City of Farmersville MSR Page 2-30
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.3 FINANCING OPPORTUNITIES AND CONSTRAINTS
The purpose of this section is to evaluate a jurisdictions capability to finance needed improvements and
services.
2.3.1 Annual Budget
In recent years, it has been challenging for the City of Farmersville to reach a balanced budget. The City
adopted its fiscal year 2004-05 budget on October 25, 2004. The budget was passed with the anticipation
of the passage of two local measures, U and V, which would have increased City revenues. Measure U
involved a ½ cent sales tax increase with independent annual audits, and Measure V involved a 4% utility
user’s tax with independent annual audits. Each measure was to partially ensure essential government
functions, including police, fire, and other general fund service will continue in the future, providing a
supplement to existing general fund revenues. Combined, the measures were expected to generate
additional annual general fund revenues of approximately $145,350. Only Measure U passed, increasing
annual general fund revenues an estimated $40,000. Since only Measure U passed, the City was forced to
adjust its services to balance its budget in light of revenue shortfalls. In the November 2005 election,
Measure G, which would have imposed a 4% utility user tax, was unsuccessful. A summary of revenues
and costs for general fund services is provided in Table 2-1 below. The table includes actual resources
and expenditures for fiscal year 2003-04, and resources and expenditures adopted for the fiscal year 2004-
05 budget (prior to adjustments due to the failure of Measure V).
TABLE 2-1
CITY OF FARMERSVILLE FISCAL YEAR 2004-05 BUDGET
SUMMARY OF GENERAL FUND REVENUES AND EXPENSES
Actual 2003-04 Fiscal Year 2004-05 Proposed Budget Support Needed
Service
Resources Expenditures Resources Expenditures (Resources Available)
General (City Council) $878,850 $34,437 $1,294,120 $40,600 ($1,163,520)
Administration $164,609 $333,886 $201,909 $303,997 $102,088
Recreation $4,786 $8,402 $0 $4,000 $4,000
Loss Control $49,223 $239 $40,000 $5,000 ($35,000)
Library $3,083 $7,075 $4,000 $3,000 ($1,000)
Police Department $123,081 $813,810 $78,200 $1,177,591 $1,099,391
Community Development/
$214,111 $76,028 $100,000 $71,550 ($28,450)
Code Enforcement
Fire Department $19,137 $101,515 $8,000 $130,396 $122,396
Public Works $249 $54,334 $0 $50,762 $50,762
Animal Control $1,098 $23,915 $420 $3,500 $3,080
Sub-Totals $1,458,227 $1,453,641 $1,726,649 $1,790,396 $63,747
Beginning GF Balance ($240,000)
Ending GF Balance ($176,253)
Notes: 1) Source: City of Farmersville 2004-05 Proposed Budget (Adopted October 25, 2004)
2) GF = General Fund
As indicated in Table 2-1, the proposed 2004-05 general fund budget expenditures exceed the estimated
general fund revenue resources by approximately $63,750. The budget gap increased to approximately
$169,000 as a result of the failure of Measure V, which forced the City to adjust services to balance its
budget in light of revenue shortfalls.
City of Farmersville MSR Page 2-31
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
Following the failure of Measure V, the Farmersville City Manager announced his resignation, a decision
that saved the City about $70,000 annually until a new City Manager can be brought in. The Mayor of
Farmersville was quoted in a Visalia Times Delta article (November 05, 2004) explaining “We’re going
to have to make things work with the staff we’ve got right now, although I don’t think we can go on
indefinitely without a City Manager.” Rene Miller, Farmersville’s financial director, was named the
acting City Manager.
In addition to the general fund, the City’s budget is set up for several other funds which are to be used for
specific purposes. These funds are listed below.
• Water Utility Fund
• Water Development Fund
• Sewer Utility Fund
• Sewer Development Fund
• Refuse Fund
• Police Grants
• Drug Enforcement Fund
• Federal Grant Fund
• Surface Transportation Fund
• Gas Tax Fund
• Transportation Fund (LTF)
• Storm Drain Fund
• Traffic Congestion Fund
• Park Development Fund
• Park Improvement Fund
• Maintenance District (Landscape and Lighting)
• Program Income Fund
• Childcare Fund
City staff indicated that a capital improvement program is being prepared, but is unsure when it will be
completed. Capital improvement programs are typically updated annually, and implemented on a
continuous annual basis. Some of the above listed funds allocate funding toward capital improvements.
Based upon an overall general review of the funds that provide for capital improvements, the allocations
alone are not sufficient to construct new infrastructure necessary to accommodate future growth within
the City. There appears to be sufficient funding from user fees to maintain the existing infrastructure to
the satisfaction of the service users. Based upon information contained in the City’s budget, no capital
water improvements (above and beyond general maintenance and repair of existing infrastructure) were
constructed during fiscal year 2003-04. Similarly, no capital sewer or storm drain improvements
(excluding general operation and maintenance of existing facilities) were budgeted for during the 2004-05
fiscal year.
The City has significant financial constraints making it very challenging to provide efficient and quality
services to its residents while maintaining a balanced budget. The primary reason for the current fiscal
instability of the City stems from the leakage of local sales tax dollars to the nearby Cities of Visalia and
Exeter, and the high level of unemployment within the City. The City should attempt to reverse the
leakage of sales tax dollars to surrounding communities by working to attract new retail establishments to
the community, retaining existing businesses, and maintaining high standards that create an attractive
business climate which is inviting to prospective new businesses. The City should seek to attract
moderate-sized retail stores that sell the kinds of goods presently not found in Farmersville, including
appliances, furniture, electronics, and home improvement supplies. The City and chamber of commerce
City of Farmersville MSR Page 2-32
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
should work to attract high sales tax generating dealerships including automobile, boats, trailers, and farm
equipment that could be located in Farmersville.
The City has opportunities to enhance tax increment revenues by encouraging development in the
redevelopment district. As prescribed in the GPU, the City could consider the reduction of development
impact fees, and higher residential densities in the redevelopment district in order to encourage infill
development. Due to the City’s constrained financial resources, the City should continue to actively
pursue State and Federal grants to expand and improve its current infrastructure and attract new
businesses. Consistent with goals outlined in the City’s GPU, the redevelopment agency should, on
behalf of existing companies or companies interested in locating if Farmersville, apply for State or
Federal grants that assist the company with off-site improvements, purchase of land or equipment or
training of employees.
Revenue generated from development impact fees is allocated to specific funds, and is used for the
construction of new infrastructure. Costs associated with the operation and maintenance of existing
facilities is generally derived from user fees, reconnection fees, and various intergovernmental revenues
for transportation facilities. As prescribed by the GPU, the City should ensure that development impact
fees pay for public improvements required by the infrastructure Master Plans. The GPU recommends that
a new fee schedule be prepared for Farmersville’s development impact fees to ensure that new uses pay
their fair share of the costs of providing infrastructure and services, while remaining competitive with
other Cities and surrounding communities. City staff indicated that new impact fees will be in place by
January 2006.
2.3.2 Written Determinations
1. The City’s budget clearly describes the services provided by the City to its residents and the
funds expended for those services, although in recent years, the City has struggled to reach a
balanced budget. The City adopted its fiscal year 2004-05 budget on October 25, 2004.
2. The City’s budget for fiscal year 2004-05 was adopted with the anticipation of the passage of
two local measures, U and V, a ½ cent sales tax increase, and a 4% utility user’s tax,
respectively. Since only Measure U passed, the City was forced to adjust its services to
balance its budget in light of funding constraints. In the November 2005 election, Measure
G, which would have imposed a 4% utility user tax, was unsuccessful.
3. Following the November 2004 elections, the City Manager of Farmersville announced his
resignation. The City has indicated that in the meantime, they will have to get by with
current staff, and have no immediate plans to fill the City Manager position. Rene Miller, the
finance director of the City has been named acting City Manager.
4. The City’s current financial constraints stem from the leakage of local sales tax dollars to the
nearby Cities of Visalia and Exeter. The City should attempt to reverse the leakage of sales
tax dollars to surrounding Cities by working to attract new retail establishments to the City,
retaining existing businesses, and maintaining high standards that create an attractive
business climate which is inviting to prospective new businesses.
5. The City has opportunities to enhance tax increment revenues by encouraging development in
the redevelopment district. The City should consider the reduction of development impact
fees, and higher residential densities in the redevelopment district in order to encourage infill
development.
City of Farmersville MSR Page 2-33
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
6. The City should continue to actively pursue State and Federal grants to expand and improve
its current infrastructure and attract new businesses. The redevelopment agency should, on
behalf of existing companies or companies interested in locating in Farmersville, apply for
State or Federal grants that assist companies with off-site improvements, purchase of land or
equipment or training of employees.
7. Likely fiscal benefits to the City from development within the SOI could include modest
levels of property tax collections from residential land development (upon annexation of the
land), potential transient occupancy tax revenues from new recreational land uses, and sales
tax revenues where retail/commercial uses are developed. Likely fiscal costs to the City
would typically include public maintenance of infrastructure completed for new projects in
the SOI, and the provision of public safety services.
8. Farmersville’s development impact fees should be updated to ensure that new uses pay their
fair share of the costs of providing infrastructure and services, while remaining competitive
with other Cities and surrounding communities. City staff indicated that new impact fees will
be in place by January 2006. The City is also having a capital improvement program
prepared, but is unsure when it will be completed.
9. The City recognizes the need to overcome significant financial constraints, and continues to
develop strategies to enhance current revenue streams. An example would be the passage of
Measure U in 2004, a ½ cent increase in local sales tax, revenue that is to be used to partially
ensure essential government functions, including police, fire, and other general fund service
will continue in the future.
10. The City should continue efforts to pass a utility users tax to supplement general fund
revenues. Farmersville is currently only one of two City’s in Tulare County that does not
have a utility user tax, the other being Visalia, which has the largest sales tax base in the
County. For all other City’s in Tulare County, the utility user tax has become a stable source
of revenue to fund general government services.
City of Farmersville MSR Page 2-34
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.4 COST AVOIDANCE OPPORTUNITIES
The purpose of this section is to identify practices or opportunities that may help to eliminate unnecessary
costs.
2.4.1 Budget Preparation
Avoiding unnecessary costs is generally associated with the proper planning and preparation of a
comprehensive budget. This is accomplished by allocating monetary resources to specific uses with a
primary goal of providing and maintaining high service levels to the public it serves.
2.4.2 Purchasing Policy
A comprehensive purchasing policy also helps an agency avoid unnecessary costs. A City’s purchasing
policy should promote the cost effective procurement of goods and services. The policies should
establish specific rules and regulations for purchasing services and capital assets for the City. A
comprehensive purchasing policy addresses issues including bid requirements and procedures, contracts
for goods and services, contract administration, insurance and bonds, inventory control, and cost control
methods, and guidelines for retaining consultant services.
2.4.3 Other Opportunities
The City can avoid unnecessary costs by implementing growth management practices, consistent with
GPU policies. By promoting development in infill areas and outlying areas where infrastructure is
already in place (and has excess capacity) the City would avoid unnecessary up front costs associated
with extending infrastructure to outlying undeveloped areas. Through the preparation, implementation,
and updating of infrastructure Master Plans, the City can avoid unnecessary costs by incrementally
expanding its infrastructure to areas zoned for General Plan development. Master Plans and Specific
Plans also help to ensure that duplication of services does not occur.
In addition to falling short of a balanced general fund budget, many of the City’s enterprise funds also
have expenditures which exceed resources. The City should explore the feasibility of outsourcing
services currently provided by the City including administration, and water service. Outsourcing could
help the City avoid unnecessary overhead costs. The City should also explore the feasibility of
outsourcing domestic water service through a private urban water supplier such as California Water
Service Company. The City could charge a franchise fee for operating within the City. The cost savings,
and revenue losses associated with such actions should be comprehensively evaluated prior to any
decisions being made.
The City could also avoid unnecessary costs through the construction of joint use facilities, including but
not limited to recreational sports fields, parks, or a museum (in cooperation with the County). Additional
practices which have the potential of eliminating unnecessary costs include the formation of homeowners
associations for larger scale residential developments where shared (community) facilities are present.
Associations could maintain facilities such as streets, play grounds, swimming pools, parks, and gyms,
thereby relieving the financial obligations of the City.
Comparing the City’s budget for fiscal year 2003-04 with actual year end results indicates that revenues
generated from investment earnings fell significantly short of what was anticipated. For example, the
City budgeted $17,000 in revenue generated from investment earnings on the general fund, and, at year
end, had only generated $571 from general fund investment earnings. The water utility fund was
budgeted for $3,000 in investment earnings, and only earned $68; the water development fund was
City of Farmersville MSR Page 2-35
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
budgeted for $3,100 in investment earnings, and only earned $49. Other funds experienced similar
shortfalls in investment earnings. The City should review its investment practices to avoid unnecessary
costs associated with losses (or shortfalls) on investment earnings.
2.4.4 Written Determinations
1. Master planned infrastructure helps the City in avoiding unnecessary costs through effective
planning and implementation policies, and help eliminate overlapping and/or duplicative
services.
2. The City can avoid unnecessary up front costs of extending infrastructure to undeveloped
areas by promoting effective growth management practices. The City should first promote
development within infill areas, and areas where infrastructure is already in place.
3. The City has opportunities to avoid unnecessary costs through the construction of joint use
projects including recreational facilities, parks, or a museum (in coordination with Tulare
County).
4. The City could avoid unnecessary costs associated with maintaining infrastructure through
the formation of homeowners associations within residential developments for larger scale
residential developments or condominiums where shared (community) facilities such as
playgrounds, parks, gyms, or swimming pools are present.
5. The City should review its investment practices to avoid unnecessary costs associated with
losses (or shortfalls) on investment earnings. The City’s investment policy only allows for
Local Agency Investment Fund (LAIF) or Treasury Bills (T-Bills) investments.
City of Farmersville MSR Page 2-36
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.5 OPPORTUNITIES FOR RATE RESTRUCTURING
The purpose of this section is to identify opportunities to positively impact rates without decreasing
service levels.
2.5.1 Fee Structure
The City has in-place development impact fees, connection fees, reconnection fees, and monthly user fees
which are utilized to expand and maintain the City’s infrastructure systems. After several requests, the
City has not provided their adopted development impact fee schedule, or user fee schedule, making it
difficult to compare and evaluate the current rate structure for the City.
Utility user fees should be reviewed annually to ensure that rates are keeping pace with inflation,
construction costs, and cost of living indexes. As indicated in the City’s fiscal year 2004-05 budget,
excluding beginning working capital, the financial resources of the water utility, and sewer utility funds
are outweighed by the operating and maintenance expenses for each of the respective utilities.
Based upon information contained in the Wastewater User Charge Survey Report FY 2004-05 (CalEPA –
State Water Resources Control Board), Farmersville residents pay a monthly rate of $21.25 for sewer
service. The City also has a fee of $550 for new connections. Table 2-2 shows a comparison of the sewer
rates (and connection fees) charged by each City within Tulare County. The table also shows the average
household income within each City as reported by the Census 2000.
TABLE 2-2
SEWER RATE COMPARISON
City Monthly Sewer Rate Connection Fee Avg. Household Income Rate/Income Ratio
Dinuba $16.12 $3,500 $2,779/mo. 0.58%
Exeter $16.00 $1,900 $2,812/mo. 0.57%
Farmersville $21.25 $550 $2,307/mo. 0.92%
Lindsay $27.11 $700 $2,025/mo. 1.34%
Porterville $25.39 $3,375 $2,670/mo. 0.95%
Tulare $22.19 $342 $2,803/mo. 0.79%
Visalia $13.81 $2,325 $3,446/mo. 0.40%
Woodlake $13.00 $960 $1,971/mo. 0.66%
Average $19.36 $1,707 $2,602 0.78%
Notes: 1) Source: Wastewater User Charge Survey Report F.Y. 2004-05 (CalEPA – SWRCB)
2) Average household incomes based upon Census 2000 data
3) Rate/Income Ratio calculated by dividing monthly rate by Avg. Household Income
As indicated in Table 2-2, the City of Farmersville charges a slightly higher than average monthly rate for
sewer service in comparison to the other Cities within Tulare County. Farmersville’s fee for a new
connection to the system is among the lowest of surrounding Cities. On average, the cost of sanitary
sewer service within Farmersville equates to approximately 0.92% of the average household income
within the community.
City of Farmersville MSR Page 2-37
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.5.2 General Plan
The City’s general plan establishes several goals and policies with regard to the City’s financial structure.
Some of the goals and policies relating to the financial structure of the City, as prescribed by the general
plan are identified below.
• The City’s water, sewer and storm drainage development impact fees shall be reviewed on an
annual basis. The review should focus on the relationship between the amount of fees being
collected for each of the accounts and the future capital needs of each system based on
development trends in Farmersville.
• The City should work with the private sector to participate in the upgrading of the
infrastructure system when it is developing in the City. The City may wish to work with
developers to upgrade a part of the infrastructure or street system that is not part of the project
being developed.
• The Farmersville Redevelopment Agency should develop an Existing Company Expansion
Program where funds would be provided by the Agency to a company if they hired additional
employees. The Redevelopment Agency could use redevelopment or CDBG funds to finance
an Existing Company Expansion Program.
• The City should explore the creation of a downtown maintenance district to pay for the cost
of maintaining improvements in the downtown, such as landscaping, street furniture, parking
lots and lighting.
• The City should consider the reduction of development impact fees in the redevelopment
district in order to encourage infill development.
• A new fee schedule shall be developed for Farmersville’s development impact fees.
• The fees for Farmersville’s planning, subdivision and zoning applications should be reviewed
and amended every two years, as necessary. The fees should be developed consistent with
Assembly Bill 1600, which requires a clear demonstration between the need for fees and their
use.
The City’s GPU provides an excellent planning tool, and establishes effective goals and policies with
regard to the financial structure of the City. The City should work to implement goals and policies
outlined in the GPU.
2.5.3 GASB 34
GASB 34 requires local governments with long lived capital assets to report the value of their
infrastructure assets. Infrastructure reporting is required in order to determine whether current-year
revenues were sufficient to cover the cost of current-year services; assess the service efforts and costs of
programs; determine whether the government’s financial position improved or deteriorated as a result of
the year’s operations; assess the government’s financial position and condition; and to assess the service
potential of physical resources having useful lives that extend beyond the current period.
The implementation of infrastructure reporting is divided into three phases based on a government’s
annual revenue. For governments having total annual revenues of less than $10 million, initial
City of Farmersville MSR Page 2-38
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
prospective reporting was required to be completed by the end of fiscal year 2003, and retroactive
reporting is optional, and is required to be completed by fiscal year 2007. Prospective reporting includes
all assets acquired, renovated, restored or improved after 6/15/1999. Retroactive reporting includes all
assets acquired, renovated, restored or improved after 6/30/1980. Infrastructure reporting is required to
be updated annually.
The City of Farmersville should work to comply with the requirements of GASB 34 to improve the
financial reporting of the City.
2.5.4 Written Determinations
1. The City has in-place development impact fees, connection fees, reconnection fees, and
monthly user fees which are utilized to expand and maintain the City’s infrastructure systems.
2. City staff indicated that new impact fees will be in place by January 2006. The City is also
preparing a capital improvement program, but is not sure when it will be completed. Capital
improvement programs prioritize capital infrastructure needs in line with development
demands, and within available funding.
3. The City should annually review utility user fees to ensure that rates are keeping pace with
inflation, construction costs, and cost of living indexes. Utility user fees are to be used for
operation and maintenance of existing facilities, and not for the construction of new
infrastructure.
4. Monthly rates for sanitary sewer service in Farmersville are slightly above average compared
to other Cities in Tulare County, while the City’s fee for a new sanitary sewer connection is
among the lowest.
5. The City of Farmersville should work to implement goals and policies outlined in the general
plan, as it establishes effective goals and policies with regard to the City’s financial structure.
6. The City of Farmersville should work to comply with the requirements of GASB 34 to
improve the financial reporting of the City.
City of Farmersville MSR Page 2-39
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.6 OPPORTUNITIES FOR SHARED FACILITIES AND RESOURCES
The purpose of this section is to evaluate opportunities for a jurisdiction to share facilities and resources,
thereby increasing efficiency.
2.6.1 Current Shared Facilities
The City of Farmersville has provided limited information with respect to current facilities sharing
activities. Based upon information compiled for the Visalia Municipal Service Review, the Visalia City
Coach system was expanded to serve the City of Farmersville. Prior to voting to expand the Visalia City
Coach system to service the City, Farmersville was the only City in the County without some sort of
public transportation.
The City also has mutual aid agreements with surrounding jurisdictions to provide fire and emergency
support services. City officials indicated that the City’s public safety force responds to areas outside of
the City more often than others respond to the City for assistance. City officials also indicated that
Farmersville Fire responds out into the County to assist on an almost 2 to 1 basis.
2.6.2 Future Opportunities
With the State budget crisis impacting both Counties and Cities, the need for intergovernmental
cooperation is becoming apparent, as every agency is facing an unprecedented assault on local resources.
For this reason, it is important for City’(s) and the County to meet this challenge on common ground.
To maintain acceptable levels of public safety services, the City should work with the County to establish
volunteer programs, and continue to improve the mutual aid response arrangements with County Law
Enforcement and Fire Divisions.
Other future opportunities for shared facilities include the coordination and construction of recreational
facilities including parks, hiking/bike trails, scenic trails, etc., particularly west of the current City limits.
The area separating the Cities of Visalia and Farmersville could be considered ideal for the construction
of joint recreational facilities, as there are several waterways which enhance the recreational appeal of the
area. Planning this area for future recreational facilities could be accomplished as a joint effort between
the City of Visalia, the City of Farmersville, and Tulare County. Recreational improvements within this
area would not only enhance the overall aesthetics, but would also establish an open boundary, or
greenbelt, between the Cities of Visalia and Farmersville. The recreational aspects of trail connections
offer opportunities for Cities and Counties to join recreational resources not only to the benefit of the
Cities residents’, but for the general public of the County as well.
The City’s general plan establishes several goals and policies that promote intergovernmental and agency
coordination to effectively enhance the community’s image as a whole. Some of these goals and policies,
as prescribed by the general plan are outlined below.
• The City should establish partnerships with local organizations such as the Boy Scouts, C-
SET, and other youth organizations to assist with community “clean up” efforts.
• The City should contact the Urban Tree Foundation to seek their assistance in the
development of a tree planting program in the downtown and on major streets, such as
Farmersville Boulevard and Visalia Road.
City of Farmersville MSR Page 2-40
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
• The City should convene an annual study session with the Farmersville Unified School
District (F.U.S.D.) to discuss planning matters that are of mutual interest. Schools should be
designed to accommodate some of the City’s recreational needs such as playing fields, hard
courts and running tracks.
• The City should meet with officials from Visalia and Exeter to explore the concept of
forming a greenbelt to keep the Cities from growing together.
• The City should work with a farmland conservation organization such as American Farmland
Trust, to establish agricultural conservation easements on lands that surround Farmersville.
• The City should consider hiring an economic development specialist/grant writer, to pursue
industry leads and grant funds. The City may wish to consider sharing this position with
other neighboring communities, in order to reduce expenses.
The City’s general plan also addresses special issues with regard to the Linnel Farm Labor Center, and the
Cameron Creek Colony which are unique to Farmersville. The Linnel Farm Labor Center is a farm labor
housing development operated by the Tulare County Housing Authority on land west of Farmersville.
Development in Farmersville is continuing to expand towards Linnel, with recent developments located
approximately ¼ mile east of Linnel. Linnel has its own wastewater treatment plant, situated on fourteen
acres on the east side of the site. Farmersville is down-wind from Linnel and on occasion, odors from the
plant are noticeable in the community. The presence of Linnel (in particular the WWTF) could
negatively affect Farmersville’s future growth in this area. The City should explore the possibility of
closing Linnel’s WWTF, and connecting into Farmersville’s WWTF. The City and County should work
together to identify funding to extend lines from Farmersville’s sewer system to serve Linnel, and expand
Farmersville’s WWTF.
Cameron Creek Colony is a rural residential subdivision situated northeast of Farmersville, on the east
side of Farmersville Boulevard, midway between Walnut Avenue and SR 198. Many of the dwellings are
poorly maintained and appear to be substandard in terms of building and zoning codes. All of the
dwellings are hooked to individual on-site septic systems and water wells. Roads are poorly maintained
and were constructed without curbs, gutters, sidewalks or street lights, and without storm drainage
facilities. Although presently under the jurisdiction of Tulare County, the Cameron Creek Colony is
ultimately in Farmersville’s future growth area. As prescribed by the general plan, the City should work
with Tulare County to establish a redevelopment district to generate funding to bring public and private
development up to code in Cameron Creek, including streets, utilities, and dwellings. In addition, the
City and County should negotiate a special tax-sharing agreement that places the City in a better position
to assume public services requirements for Cameron Creek.
2.6.3 Written Determinations
1. Based upon previous research, the City of Visalia voted to expand its public transportation to
service Farmersville.
2. Farmersville also has mutual aid agreements with surrounding jurisdictions to provide fire
and emergency support services. City officials indicated that the City’s public safety force
responds to areas outside of the City more often than others respond to the City for assistance,
and that Farmersville Fire responds out into the County to assist on an almost 2 to 1 basis.
City of Farmersville MSR Page 2-41
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
3. The City’s general plan prescribes several opportunities for the City to share facilities and
resources in the future.
4. As prescribed by the Farmersville General Plan, the City has opportunities to work with the
Cities of Visalia and Exeter, and Tulare County to establish greenbelts to prevent the Cities
from physically growing together. This would also help to preserve prime agricultural land
within the County.
5. The City should work with Tulare County to resolve mutual planning issues associated with
the Linnel Farm Labor Center, and the Cameron Creek Colony. The Linnel Farm Labor
Center, the Cameron Creek Colony, and the City could potentially share a single wastewater
treatment facility.
6. The City should continue to look for opportunities to work with surrounding jurisdictions and
agency’s, and cooperatively address mutual planning issues.
City of Farmersville MSR Page 2-42
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.7 GOVERNMENT STRUCTURE OPTIONS
The purpose of this section is to consider the advantages and disadvantages of various government
structures to provide public services.
2.7.1 Development within SOI Areas
One of the most critical elements of LAFCO’s responsibilities is in setting logical service boundaries for
communities based on their capability to provide services to affected lands. Similar levels of public
participation can be expected for either City or County development projects in the planning and
development process for the SOI territories. It is possible that development in the SOI areas that occurs
under County control may not fully resolve impacts to the City, such as increased traffic on City streets,
and new groundwater wells to support County development impacting Farmersville groundwater aquifers
and other analogous assumptions. It can also be assumed that the reverse is true; that development
controlled only by the City may leave impacts in the County unresolved in whole or in part. The
challenge of this planning effort is to coordinate shared infrastructure and improvements so as to mitigate
impacts on either side of the City/County limit boundary. Since the development of the SOI territories
generally relies on master planned infrastructure available from the City, it is logical that the City assume
the lead in planning for SOI properties.
If the City were to be the lead planning agency for properties within the SOI, LAFCO could require the
City to bring coordinated plans for infrastructure forward to LAFCO at the time specific annexations
requests are submitted. This would provide a checks and balance system for incorporating new lands
within the City, and would render the remaining County lands a part of an integrated whole.
The City of Farmersville currently has logical service boundaries in place including an urban
development boundary, a sphere of influence, and an urban area boundary, to help guide development in
Farmersville. There are no County islands, or areas in which there is a potential for duplication of
services. It would be logical for the City of Farmersville to ultimately assume service provisions within
the Linnel Farm Labor Center, and the Cameron Creek Colony, both of which are currently under the
jurisdiction of the County.
The City’s ability to effectively provide services to SOI areas appear to be limited primarily by financial
resources. For this reason, it is likely that developers would be responsible for constructing the
infrastructure to accommodate their development. Requiring the preparation of Specific Plans for
development within the City’s SOI could help identify funding mechanisms, infrastructure needs, and
planning area boundaries to better meet the needs of the public. The City should evaluate the cost-
benefits of restructuring overhead, including staff, capital outlays, allocation of reserves or savings,
loaded administrative charges for grant administration, accounting, and other contracted services.
City officials have indicated that the financial picture has and continues to change. Additional growth
would also aid in expansion of services through impact fee revenues, and additional sales tax revenue.
2.7.2 Boundary Conflicts
There are no foreseeable boundary conflicts with surrounding Cities or special districts that would affect
the current governmental structure of Farmersville.
City of Farmersville MSR Page 2-43
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.7.3 Written Determinations
1. Since development of properties within the SOI generally relies on Master Planned
infrastructure available from the City, it is logical for the City to assume the lead in planning
for these sites.
2. Coordinated infrastructure plans, for development within the SOI area, submitted with
specific annexation requests would create a checks and balance system for incorporating
lands into the City while promoting improvements to impacted adjacent County land.
3. The City’s ability to effectively provide services to SOI areas appear to be limited primarily
by financial resources. For this reason, it is likely that developers would be responsible for
construction the infrastructure to accommodate such development. Requiring the preparation
of Specific Plans for development within the City’s SOI could help identify funding
mechanisms, and infrastructure needs to better serve such development.
4. City officials have indicated that the financial picture has and continues to change.
Additional growth would also aid in expansion of services through impact fee revenues, and
additional sales tax revenue.
5. There are no foreseeable boundary conflicts with surrounding Cities or special districts that
would affect the current governmental structure of Farmersville.
City of Farmersville MSR Page 2-44
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.8 EVALUATION OF MANAGEMENT EFFICIENCIES
The purpose of this section is to consider the management structure of the jurisdiction.
2.8.1 Government Structure
The City of Farmersville operates under the council-manager form of government. The City council
appoints a City Manager that is trained and experienced in municipal operations. The Farmersville City
Manager resigned on November 3, 2004 due to the City’s financial hardships. Rene Miller,
Farmersville’s finance director, was named acting City Manager. Police Chief Mario Krstic will assist
Miller. The City has no immediate plans to fill the City Manager position.
The City Manager, as chief executive officer of the City, is responsible for various functions assigned by
the City Council. These include overseeing the implementation and administration of Council policy,
supervising the activities of all departments, enforcing City ordinances, preparing the operating and
capital improvement budgets, and other such duties and responsibilities as may be assigned by City
Council. The City Manager’s office has the responsibility to ensure the needs and concerns of the
community and the City organization are properly addressed to assure Farmersville is a good place to live
and conduct business. To accomplish this, the senior staff of the City Manager’s office is involved in
community, County, regional, and State issues, as well as supporting and guiding the City organization.
2.8.2 Written Determinations
1. The City of Farmersville operates under the council-manager form of government. The
Farmersville City Manager resigned on November 3, 2004 due to the City’s financial
hardships. Rene Miller, Farmersville’s finance director, was named acting City Manager.
The City has no immediate plans to fill the City Manager position.
2. It is likely that the City’s management efficiencies would improve through increased City
revenue streams. Increased revenue streams could be accomplished through promoting
economic development in the City, and continuing to apply for State and Federal grant/loan
money that can be used for government operations.
City of Farmersville MSR Page 2-45
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01
2.9 LOCAL ACCOUNTABILITY AND GOVERNANCE
The purpose of this section is to evaluate the accessibility and levels of public participation associated
with the agency’s decision-making processes.
2.9.1 Public Access and Information Methods
The governing body of Farmersville is the City Council, which is elected in compliance with California
Election Laws. Current members of the Farmersville City Council and their terms of office are identified
below.
• Paul Boyer (12/1/04 – 12/3/08)
• Don Rowlett (12/1/04 – 12/3/08)
• Leonel Benavides (12/6/02 – 12/3/06)
• Mike Santana (12/6/02 – 12/3/06)
• Myron Wiley (12/6/04 – 12/3/06)
The City complies with the Brown Act, which requires meetings of public bodies to be “open and public”.
Regular City Council meetings are held on the second and fourth Monday of each month at 7:00 p.m. in
City Hall Council Chambers located at 909 W. Visalia Road Farmersville, CA.
Farmersville is the only City within Tulare County that does not have an established website. The
development of a website could help the City attract new businesses, enhance public access to
information, and improve community involvement in City activities. City officials have indicated that
there are plans to implement a website in the near future.
The City could also get a better understanding of the needs of the community by conducting an annual (or
bi-annual) public opinion survey, which would help identify services which need improvement, and those
with which the public is satisfied. The preparation of a regular newsletter would also help keep the
community informed on the current events of the City.
2.9.2 Written Determinations
1. The City complies with the Brown Act, holding regular City Council meetings on the second
and fourth Monday of each month at 7:00 p.m. in City Hall Council Chambers.
2. Farmersville is the only City within Tulare County that does not have an established website.
The development of a website could help the City attract new businesses, enhance public
access to information, and improve community involvement in City activities. City officials
have indicated that there are plans to implement a website in the near future.
3. The preparation and distribution of a regular newsletter would also help keep members of the
community informed on the current events of the City.
4. The City could gain a better understanding of the needs of the community by conducting an
annual (or bi-annual) public opinion survey.
City of Farmersville MSR Page 2-46
Tulare County LAFCO MSR G1_2 Farmersville Jan06.DOC/55-7301-01