CHAPTER 4 – GOSHEN CSD MUNICIPAL SERVICE REVIEW
EXECUTIVE SUMMARY
This section provides an overview of the written determinations of the Goshen Community Services
District Municipal Service Review (MSR). As part of its review of municipal services, the Tulare County
Local Agency Formation Commission (LAFCO) is required to prepare a written statement of its
determination with respect to each of the following: 1) Growth and population projections for the affected
area; 2) Infrastructure needs and deficiencies; 3) Financing constraints and opportunities; 4) Cost
avoidance opportunities; 5) Opportunities for rate restructuring; 6) Opportunities for shared facilities; 7)
Government structure options; 8) Evaluation of management efficiencies; and 9) Local accountability and
governance. These requirements are established by AB 2838, the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000. The Goshen CSD MSR identifies the following written
determinations:
Written Determinations
1) Growth and Population
1. The Census Designated Place (CDP) Boundary for Goshen is generally (with minor
exceptions) coterminous with the current District Boundary.
2. Census 2000 data indicates that Goshen had a population of 2,394 as of January 2000, while
the Goshen Community Plan, adopted in 1978, projected a year 2000 population between
3,625, and 3,840, which was based upon an annual growth rate of 5%.
3. Between 1990 and 2000, Goshen experienced an average annual population growth rate of
approximately 1.4%, compared to 0.6% for the unincorporated areas of Tulare County.
4. It is anticipated that over the next twenty years (approximately year 2025) Goshen will
experience a higher growth rate than as indicated by historical trends. This is a result of
development within the nearby City of Visalia as it continues to expand towards Goshen
thereby increasing development pressures in Goshen.
5. With an annual growth rate between 2% and 3%, the Goshen CSD could expect a year 2025
District population between 3,900 and 5,000.
6. The Tulare County RMA is having a comprehensive update to the Goshen Community Plan
prepared to address the future needs of the community relating to growth, land use, housing,
and public services. The update of the Goshen Community Plan should be coordinated and
consistent with the Tulare County General Plan Update, and any Sewer Master Planning
being completed by the District.
2) Infrastructure Needs and Deficiencies
1. The main sewer system for the Goshen community is comprised of a collection system which
was constructed in the mid to late 1990s. The construction of the District’s sewer system was
funded through a United States Department of Agriculture, Rural Economic and Community
Development Grant, and Small Community Grant.
Goshen Community Service District MSR Page 4-1
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
2. Pursuant to obtaining funding for the Goshen Sewer Project, the Goshen CSD entered into a
Wastewater Service Agreement with the City of Visalia for treatment of the District’s
wastewater.
3. The District’s wastewater collection system dumps into a lift station (owned and operated by
the District) near the intersection of Avenue 305 and Effie Drive, which in turn, pumps the
wastewater into a 24-inch line in Camp Drive (that is owned and maintained by the City of
Visalia). The sewer lift station operates with two pumps, and has a design capacity of
500,000 GPD.
4. The Wastewater Service Agreement between City of Visalia and the Goshen CSD allows for
a current contracted average daily discharge to the City’s treatment plant of 335,000 GPD.
The Wastewater Service Agreement does provide for the purchase of additional capacity
which would be charged on a percentage increase basis.
5. As of November 2005, the District was contributing an average daily flow of approximately
315,000 GPD of raw sewage to the City’s WWTF. Assuming the District can accommodate
up to 500,000 GPD based upon the limitations of the lift station, it can be concluded that the
District’s sewer system is operating at approximately 65% of its capacity.
6. The District is currently working towards the adoption of a Sewer System Master Plan, which
will assist the District in expanding its collection system in line with development trends and
the needs of the community. The Sewer System Master Plan should be consistent with and
coordinated with the Tulare County General Plan Update and the Goshen Community Plan
update to provide for a sound connection between land zoned for development and the
sanitary sewer infrastructure that will serve such development. The Master Plan should also
identify funding sources to construct future capital improvements.
3) Financing Opportunities and Constraints
1. The District prepares a comprehensive and thorough annual budget that clearly describes the
services provided to residents and the funds expended for those services.
2. The District generally requires new development projects to construct the necessary sewer
infrastructure to serve their development. A program of developer-obligated infrastructure
improvements will provide for installation of physical infrastructure to serve development
sites and therefore will not become an obligation of the District.
3. The District’s budget for fiscal year 2003-04 included contingency funds of $27,008. As of
July 1, 2003 the District had a cash balance of $167,000, of which $100,000 was allocated
towards capacity purchases and $67,000 was allocated towards system replacement.
4. The District has two long term debts; one that includes principal and interest bond payments
totaling $162,328 during the FY 2003-04 budget cycle and a separate loan in which the
District paid $10,000 during the FY 2003-04 budget cycle.
4) Cost Avoidance Opportunities
1. The District avoids excessive overhead costs by operating with a part-time staff, which
provides adequate levels of service to the small community. The District also avoids
Goshen Community Service District MSR Page 4-2
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
unnecessary costs by contracting out professional services including engineering, legal
services, and other consulting services.
2. The District should continue to work with the development community to fund the
construction of capital infrastructure improvements that would serve new development sites.
5) Opportunities for Rate Restructuring
1. In July 2004, the Goshen CSD increased rates charged for sewer service to $38 per EDU for
commercial uses, and to $32 per EDU for residential service.
2. The Goshen CSD charges one of the highest monthly rates for sewer service compared to
other sewer service providers throughout the County. The cost of sanitary sewer service
within Goshen equates to approximately 1.36% of the average household income within the
community.
3. The Goshen CSD monthly rates are currently among the highest compared to other service
providers throughout the County making it difficult to justify further rate increases. The
District’s connection fee is below average compared to other sanitary sewer service providers
in the County.
4. The District should periodically review its monthly user and connection fees to ensure that
quality service will continually be provided to existing and future residents.
6) Opportunities for Shared Facilities
1. Currently, the Goshen CSD contracts with the City of Visalia for wastewater treatment
services, as the Goshen CSD does not own or operate an independent WWTF.
2. At present, there is a clear distinction between the sewer infrastructure of the District, and the
sewer infrastructure of the City. To eliminate the potential for duplication of services, a clear
distinction between District and City infrastructure and associated service areas should
remain in tact.
3. The Wastewater Service Agreement between the District and the City outlines specific cases
in which interagency coordination is to occur.
4. Since the Goshen sewer system is generally located in roads owned and maintained by Tulare
County, the District should work closely with the County on proposed sewer improvements
that would impact County roadways.
5. The District currently takes advantage of sharing staff and equipment with other service
providers on an as needed basis.
7) Government Structure Options
Development within SOI Areas
1. The Goshen CSD is currently working toward the adoption of a Sewer System Master Plan
which will help guide expansions of and improvements to the District’s sewer system. The
Goshen Community Service District MSR Page 4-3
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
Master Plan will plan infrastructure improvements to accommodate the build-out of the
Goshen CSD SOI.
2. Other than potential boundary conflicts with the City of Visalia, there are no foreseeable
conditions that would indicate that development within the District’s SOI would result in a
change in government structure.
3. Tulare County LAFCO has adopted specific policies for reviewing proposals for a change in
organization, reorganization, incorporations, dissolution and other proposals processed by
Tulare County LAFCO. Any changes in organization should be in accordance with the
Polices and Procedures of Tulare County LAFCO.
Boundary Conflicts
1. The governmental structure of the Goshen CSD could be affected by the potential
overlapping of boundaries with the City of Visalia. In addition to overlapping SOI’s, the
Visalia UGB generally encompasses the entire area currently serviced by the Goshen CSD.
2. The Goshen CSD has a Wastewater Service Agreement with the City of Visalia, which sets
forth specific criteria with regard to wastewater collection and treatment services within the
boundary of each agency.
3. Boundary conflicts and service provisions should ultimately be resolved between the City of
Visalia, the Goshen CSD, and Tulare County LAFCO.
8) Evaluation of Management Efficiencies
1. Based upon information made available, it appears that the provision of sanitary sewer
collection is managed in an efficient manner and meets the needs of the community and
ratepayers.
2. The Goshen CSD is governed by a five member Board of Directors elected at large from
within its boundaries and is responsible for setting policy and general administrative
procedures.
3. The District currently operates with a part-time staff and contracts out for other services,
including engineering, legal counsel, accounting, and other consulting services.
4. The District’s part time personnel provides many functions of the District, which will likely
continue in the future since funding for full-time staff is neither needed nor cost effective for
a small CSD.
5. The District’s answering message does not provide contact information in case of
emergencies. To more promptly and efficiently respond to emergency situations, it is
recommended that the District provide an emergency contact number on its answering
message.
9) Local Accountability and Governance
1. The District complies with the Brown Act open meeting law by holding regularly scheduled
meetings in which the public is invited. Regularly scheduled meetings are held on the fourth
Goshen Community Service District MSR Page 4-4
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
Thursday of each month at 6:00 p.m. at the District office, except for November. Agendas
for Board meetings are posted on-site at the District office.
2. The District adopts budgets and rate changes at hearings where the public is notified and
invited.
3. The District should work with the Tulare County Resource Management Agency (RMA)
and/or Tulare County LAFCO to have information regarding District affairs posted on the
Tulare County RMA and/or LAFCO website. The District could provide information such as
meeting times and locations, budgets, rates, ordinances, agendas, completed/upcoming
projects, and other District affairs to Tulare County for posting on the County’s (RMA and/or
LAFCO) website.
Goshen Community Service District MSR Page 4-5
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.0 GOSHEN COMMUNITY SERVICE DISTRICT
4.0.1 Background
The requirement for LAFCO to conduct reviews of local municipal services was established with the
passage of AB 2838 known as the Cortese-Knox-Hertzberg Local Government Reorganization Act of
2000. The bill passed the legislature, and was signed by Governor Davis on September 26, 2000. MSRs
provide LAFCOs with an additional tool to fulfill their statutory responsibilities of promoting orderly
growth and development, preserving the States finite open space and agricultural land resources, and
working to ensure that high quality public services are provided to all Californians in the most efficient
and effective manner. MSRs are a requirement of State annexation law and are required to be completed
before the consideration of a Sphere of Influence (SOI) amendment or once every five years when a SOI
amendment is not being considered.
In July 2003 Tulare County LAFCO adopted a MSR exemption policy that identifies the agencies that
would be subject to a review and the extent of that review. The agencies in Tulare County were divided
into three (3) categories: agencies subject to a full comprehensive study; agencies subject to a
questionnaire study; and agencies exempt from a MSR study. The Goshen Community Services District
(CSD) is subject to a full comprehensive study. The policy further identifies that the services subject to
review shall be:
• Police protection
• Fire protection
• Water and wastewater
• Solid waste collection and disposal
• Streets and traffic circulation
• Power generation and distribution
• Health Care
Goshen, an unincorporated community in Tulare County, is located in the northwest portion of the
County and northwest of the City of Visalia. The Goshen CSD which was formed in January 1958 has
the authority to provide the following services: recreation and park services, street lighting, and collect,
treat or dispose of sewerage and wastewater. Sanitary sewer collection is the primary service provided by
the Goshen CSD that is subject to a MSR. In the November 2004 elections voters within the Goshen
District voted to expand the powers of the Goshen CSD to include recreation including but not limited to
aquatic parks and recreational harbors, equestrian trails, playgrounds, golf courses, and swimming pools,
and for street lighting. These services are not subject to a MSR.
Goshen is located approximately 1 ½ miles north of the Visalia Municipal Airport, portions of which are
situated within the approach and departure area of the airport. It lies one tenth of a mile northwest of the
City Limits of Visalia, 6 ½ miles from the downtown shopping area of Visalia, and immediately west of
the Visalia Industrial Park. The community is square in shape, and is bisected in a northwest-
southeasterly direction by State Route (SR) 99 and the Southern Pacific Railroad tracks, which divides
the community into three approximately equal sized areas. Goshen is an agriculturally oriented service
community surrounded on the north, west and south by lands in agricultural production and on the east by
scattered residential, light industrial, agricultural and vacant land. Although primarily an agriculturally
related service center, Goshen’s industrial base is rapidly increasing, providing new employment
opportunities for residents of the community.
Goshen Community Service District MSR Page 4-6
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
Cities and communities surrounding Goshen include Visalia to the east; Tulare to the south; the
communities of London and Traver to the north and northwest, respectively; and the community of Tagus
to the southeast (along SR 99 north of Tulare). The Tulare County/Kings County Line is located
approximately 5 miles west of Goshen. The current District Boundary and the currently adopted SOI for
Goshen are illustrated on Figure 4-1. The following excerpt from the Tulare County LAFCO website
(www.co.tulare.ca.us/lafco/info.asp) defines a SOI and the purpose it serves.
A “Sphere of Influence” is the physical boundary and service area that a local
governmental agency is expected to serve. Establishment of this boundary is necessary to
determine which governmental agencies can provide services in the most efficient way to
the people and property in any given area. The Sphere of Influence requirement also
works to discourage urban sprawl by preventing overlapping of jurisdictions and
duplication of services.
The following discussions address the nine legislative factors required by the Cortese-Knox-Hertzberg
Act; 1) Growth and population, 2) Infrastructure needs and deficiencies, 3) Financial constraints and
opportunities, 4) Cost avoidance opportunities, 5) Opportunities for rate restructuring, 6) Opportunities
for shared facilities, 7) Government structure options, 8) Evaluation of management efficiencies, and 9)
Local accountability and governance.
Goshen Community Service District MSR Page 4-7
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
FIGURE 4-1 – GOSHEN CSD BOUNDARY AND SOI
Source: Tulare County GIS Database (July 2004)
Goshen Community Service District MSR Page 4-8
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.1 GROWTH AND POPULATION
The purpose of this section is to present historical and projected growth patterns and population
projections to establish a baseline for the evaluation of the service needs of Goshen.
4.1.1 Historical Data
The Census Bureau, on a decennial basis, identifies and provides detailed information on all incorporated
Cities along with several smaller unincorporated communities (termed Census Designated Places –
CDPs). In each Census, community profiles are developed and provide a wide range of information
pertaining to population, demographics, housing information, household data, education and employment,
income and poverty, and historical trends. The CDP Boundary for Goshen is generally (with minor
exceptions) coterminous with the current District Boundary. Census 2000 data indicates that Goshen had
a population of 2,394 as of January 2000. The Goshen Community Plan (Tulare County Planning
Department, 1978) projected a population between 3,625 and 3,840 for the year 2000, which was based
upon on annual growth rate of 5%. However Census 2000 data indicates that the projections contained in
the Goshen Community Plan were significantly higher than the actual growth which has occurred in the
community.
Census 1990 data indicates that Goshen had a population of 2,095 corresponding to an average annual
growth rate between 1990 and 2000 of approximately 1.4%. The unincorporated areas of Tulare County
grew from a population of 133,222 in 1990 to a population of 141,150 in 2000, corresponding to an
average annual growth rate of approximately 0.6%. It is anticipated that over the next twenty years
(approximately year 2025) Goshen will experience a higher growth rate than as indicated by historical
trends. This is a result of development within the nearby City of Visalia as it continues to expand towards
Goshen thereby increasing development pressures in Goshen. Using an estimated annual growth rate
between 2% and 3%, the Goshen CSD could expect a year 2025 District population between 3,900 and
5,000. The Tulare County Resource Management Agency (RMA) is having a comprehensive update to
the Goshen Community Plan (initially adopted in 1978) prepared to address the future needs of the
community relating to growth, land use, housing, and public services.
4.1.2 Written Determinations
1. The Census Designated Place (CDP) Boundary for Goshen is generally (with minor
exceptions) coterminous with the current District Boundary.
2. Census 2000 data indicates that Goshen had a population of 2,394 as of January 2000, while
the Goshen Community Plan, adopted in 1978, projected a year 2000 population between
3,625, and 3,840, which was based upon an annual growth rate of 5%.
3. Between 1990 and 2000, Goshen experienced an average annual population growth rate of
approximately 1.4%, compared to 0.6% for the unincorporated areas of Tulare County.
4. It is anticipated that over the next twenty years (approximately year 2025) Goshen will
experience a higher growth rate than as indicated by historical trends. This is a result of
development within the nearby City of Visalia as it continues to expand towards Goshen
thereby increasing development pressures in Goshen.
5. With an annual growth rate between 2% and 3%, the Goshen CSD could expect a year 2025
District population between 3,900 and 5,000.
Goshen Community Service District MSR Page 4-9
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
6. The Tulare County RMA is having a comprehensive update to the Goshen Community Plan
prepared to address the future needs of the community relating to growth, land use, housing,
and public services. The update of the Goshen Community Plan should be coordinated and
consistent with the Tulare County General Plan Update, and any Sewer Master Planning
being completed by the District.
Goshen Community Service District MSR Page 4-10
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.2 INFRASTRUCTURE NEEDS AND DEFICIENCIES
The purpose of this section is to evaluate the infrastructure needs and deficiencies of a jurisdiction in
terms of availability of resources, capacity to deliver services, condition of facilities, service quality, and
levels of service.
4.2.0 Sanitary Sewer Collection
The Goshen CSD is responsible for the planning and construction of a sewage collection system. The
main sewer system for the Goshen community is comprised of a collection system that was constructed in
the mid to late 1990s. The construction of the District’s sewer system was funded through a United States
Department of Agriculture Rural Economic and Community Development Grant and a Small Community
Grant. Pursuant to obtaining funding for the Goshen Sewer Project, the Goshen CSD entered into a
Wastewater Service Agreement with the City of Visalia for treatment of the District’s wastewater.
Connection from the District’s sewer system to the City of Visalia’s sewer system is through a 24-inch
gravity sewer under Camp Drive. The 24-inch line connects to the existing City SR198-Airport lift
station. The District constructed the 24-inch line as a part of the Goshen Sewer Project, although the line
is part of the City’s Master Planned Sewer System. After the line was placed in operation, the City
assumed responsibility for maintenance of the line as a part of the City conveyance system. The City is
responsible for improvements to its lift station and conveyance facilities downstream of the point of
connection. The 24-inch line is planned to provide full capacity for the ultimate build-out of the Goshen
CSD SOI. The District is responsible for the costs of construction and installation of any and all sewer
line(s) from the District’s collection system, and for any flow meters, automated sampling, or odor control
devices. Other key issues identified in the Wastewater Service Agreement, between the Goshen CSD and
the City of Visalia, are identified below.
• The District agrees to make a good faith effort to notify the City of any potential increases in
effluent flow, biochemical oxygen demand, suspended solids and other potential pollutant
levels indicated by any commercial and/or industrial development inquiries that would
significantly affect the quantity and/or quality of the District’s discharge to the City system as
soon as such potential impacts are made known to the District.
• The City shall not contract, agree or otherwise create wastewater collection treatment and
disposal service with any entity, corporation or individual which resides, does business within
or requests service for any parcel, building, street or property within the boundary of the
District.
• The Goshen Sewer Project included several 18-inch lines and the 24-inch line that are part of
the City’s Master Planned Sewer System. The City credited the District with the estimated
cost of the lines as set forth in the City Master Plan.
• The City has identified areas of the City that sewer services may be provided by connection
to the District facilities. The District agrees to consider such connections on a case by case
basis. Such requests by the City shall be submitted in writing and shall indicate the point of
proposed connection and the anticipated flows and pollutant loadings. Approval of such
connections shall be at the sole discretion and decision of the District. The City shall make
no connections to the District facilities without the prior written approval of the District.
• The District shall have the right to an amount of reclaimed water not to exceed the yearly
total flow the District conveys to the City for treatment and disposal. The District shall be
Goshen Community Service District MSR Page 4-11
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
entitled to the reclaimed water without payment to the City other than the pro-rata share of
the expense of transmission facilities and related operation and maintenance costs of the City
facilities used to convey the reclaimed water. The District shall be responsible for the cost of
the connection to the City reclaimed water system and conveyance facilities from the City
system to the District point of use.
The District’s wastewater collection system dumps into a lift station (owned and operated by the District)
near the intersection of Avenue 305 and Effie Drive, which in turn pumps the wastewater into the 24-inch
line in Camp Drive. The sewer lift station operates with two pumps, and has a design capacity of 500,000
gallons per day (GPD). The Wastewater Service Agreement between City of Visalia and the Goshen
Community Services District allows for a current contracted average daily discharge to the City’s
treatment plant of 335,000 GPD. The Wastewater Service Agreement does provide for the purchase of
additional capacity to be charged on a percentage increase basis. Table 4-1 below outlines the District’s
flow contributions to the City’s WWTF in 2003 (CA Yearly Report, Goshen 2003).
TABLE 4-1
GOSHEN COMMUNITY SERVICES DISTRICT
DISTRICT FLOW CONTRIBUTIONS FOR YEAR 2003
Flow Totals (Million
Month
Gallons, MG)
January 8.1
February 7.5
March 8.2
April 7.8
May 7.8
June 7.9
July 7.9
August 8.3
September 7.9
October 8.3
November 8.4
December 8.1
Total Annual Flow 96.2 MG
Source: CA Yearly Report, Goshen CSD, 2003
Based upon the above information, the District contributed an average daily flow of approximately
264,000 gallons per day of raw sewage to the wastewater treatment plant maintained and operated by the
City of Visalia in 2003. Service data provided by the Goshen CSD included the following information:
• Current (2004) Demands: 270,000 gallons per day
• 2025 Demands: Study in Progress
• Current Facility Capacity: Estimated 500,000 gallons per day
• Maximum Service without Expansion: 500,000 gallons per day
• Maximum Facility Capacity at Master Plan Build-out: Study in Progress
As of November 2005, the District was contributing an average daily flow of approximately 315,000
GPD of raw sewage to the City’s WWTF. Assuming the District can accommodate up to 500,000 GPD
based upon the limitations of the lift station, it can be concluded that the District’s sewer system is
operating at approximately 65% of its capacity.
Goshen Community Service District MSR Page 4-12
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
The District is working towards the adoption of a Sewer System Master Plan, which will assist the
District in expanding its collection system in line with development trends, and the needs of the
community. The Sewer System Master Plan should be consistent with and coordinated with the Tulare
County General Plan Update and the Goshen Community Plan update, to provide a sound connection
between land zoned for development and the infrastructure (sanitary sewer in the case of Goshen CSD)
that will serve such development. The Sewer System Master Plan should identify funding sources for the
construction of capital sewer improvements including an evaluation of the feasibility of implementing a
developer impact fee program consistent with the requirements of AB 1600. The Master Plan should also
consider whether current connection fees are adequate to support the construction of future capital
improvements.
4.2.1 Written Determinations
1. The main sewer system for the Goshen community is comprised of a collection system which
was constructed in the mid to late 1990s. The construction of the District’s sewer system was
funded through a United States Department of Agriculture, Rural Economic and Community
Development Grant, and Small Community Grant.
2. Pursuant to obtaining funding for the Goshen Sewer Project, the Goshen CSD entered into a
Wastewater Service Agreement with the City of Visalia for treatment of the District’s
wastewater.
3. The District’s wastewater collection system dumps into a lift station (owned and operated by
the District) near the intersection of Avenue 305 and Effie Drive, which in turn, pumps the
wastewater into a 24-inch line in Camp Drive (that is owned and maintained by the City of
Visalia). The sewer lift station operates with two pumps, and has a design capacity of
500,000 GPD.
4. The Wastewater Service Agreement between City of Visalia and the Goshen CSD allows for
a current contracted average daily discharge to the City’s treatment plant of 335,000 GPD.
The Wastewater Service Agreement does provide for the purchase of additional capacity
which would be charged on a percentage increase basis.
5. As of November 2005, the District was contributing an average daily flow of approximately
315,000 GPD of raw sewage to the City’s WWTF. Assuming the District can accommodate
up to 500,000 GPD based upon the limitations of the lift station, it can be concluded that the
District’s sewer system is operating at approximately 65% of its capacity.
6. The District is currently working towards the adoption of a Sewer System Master Plan, which
will assist the District in expanding its collection system in line with development trends and
the needs of the community. The Sewer System Master Plan should be consistent with and
coordinated with the Tulare County General Plan Update and the Goshen Community Plan
update to provide for a sound connection between land zoned for development and the
sanitary sewer infrastructure that will serve such development. The Master Plan should also
identify funding sources to construct future capital improvements.
Goshen Community Service District MSR Page 4-13
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.3 FINANCING OPPORTUNITIES AND CONSTRAINTS
The purpose of this section is to evaluate the jurisdictions capability to finance needed improvements and
services.
4.3.1 Annual Budget
LAFCO should consider the ability of the District to pay for improvements or services associated with
annexed sites. This planning could begin at the SOI stage by determining what opportunities there are to
identify infrastructure and maintenance needs associated with future annexation and development and by
identifying limitations on financing such improvements and opportunities that exist to construct and
maintain those improvements.
Based upon a review of the Goshen CSD budget for FY 2003-04 the District appears to be in sound
financial condition. The fiscal year 2003-04 budget is well organized, thorough, and clearly articulates
the District’s financial plans for the upcoming year. The District prepares a typical line item budget that
is divided into the following categories:
• Available Resources
• Estimated Revenues
• Estimated Expenditures
o Salaries and Employee Benefits
o Services and Supplies
o Appropriations
The District adopts the budget each year and it is used as the spending plan for the District. The budget
provides a framework for the District to address the following issues: reserves, revenues, expenditures,
investments, and rates and fees. Using the fiscal year 2003-04 budget as a basis for this discussion, the
District has an operating budget of $508,888, which covers salaries and employee benefits for part time
staff totaling $40,367, outside services and supplies totaling $123,586, other charges totaling $317,928,
and a contingency fund of $27,008. “Other charges” include bond agent fees, repayment of long term
debts (bonds and other) including interest and principal, and treatment fees paid to the City of Visalia. As
of July 1, 2003, the District had a cash balance of $167,000, of which $100,000 was allocated towards
capacity purchases, and $67,000 was allocated towards system replacement.
The District generally requires new development projects to construct the necessary sewer infrastructure
to serve their development. A program of developer-obligated infrastructure improvements will provide
for installation of physical infrastructure to serve development sites and therefore will not become an
obligation of the District. In some situations, developers could also work out reimbursement agreements
with the District whereby a developer is reimbursed for a portion of the infrastructure costs when
intermediate development occurs.
Since new development pays the cost of additional infrastructure and the District infrastructure is in very
good condition, the District does not have a management system in place to replace deteriorated sewer
lines on a scheduled basis. Instead, infrastructure is replaced on an as needed basis.
The District’s financial constraints involve the governmental structure and the desires of the people in the
community to fund certain activities by establishing assessment districts or fees. The laws under which a
Community Service District is governed provide the structure for funding activities. Key revenue sources
for the Goshen CSD include property taxes, sewer service/connection fees, interest on reserves, annual
Goshen Community Service District MSR Page 4-14
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
contributions from the Tulare County Redevelopment Agency, and pass through monies. One-time
revenues or pass-through funds, account for the increases and decreases in revenue from year to year.
On the expenditures side, the District budgets for the services paid for by residents and provides for other
expenses using property tax, and if appropriate, restricted reserve accounts. Key expenditures include
personnel, services and supplies, pass through revenues for projects, and principal and interest payments
for long term debt. As indicated in the 2003-04 budget, the District has two long term debts; one that
includes principal and interest bond payments totaling $162,328; and one that included a payment of
$10,000 on a separate loan.
4.3.2 Written Determinations
1. The District prepares a comprehensive and thorough annual budget that clearly describes the
services provided to residents and the funds expended for those services.
2. The District generally requires new development projects to construct the necessary sewer
infrastructure to serve their development. A program of developer-obligated infrastructure
improvements will provide for installation of physical infrastructure to serve development
sites and therefore will not become an obligation of the District.
3. The District’s budget for fiscal year 2003-04 included contingency funds of $27,008. As of
July 1, 2003 the District had a cash balance of $167,000, of which $100,000 was allocated
towards capacity purchases and $67,000 was allocated towards system replacement.
4. The District has two long term debts; one that includes principal and interest bond payments
totaling $162,328 during the FY 2003-04 budget cycle and a separate loan in which the
District paid $10,000 during the FY 2003-04 budget cycle.
Goshen Community Service District MSR Page 4-15
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.4 COST AVOIDANCE OPPORTUNITIES
The purpose of this section is to identify practices or opportunities that may help to eliminate unnecessary
costs.
4.4.1 Fiscal Structure
The Districts budget process is designed to screen out unnecessary costs. A base budget is completed by
the General Manager for review and discussion by the Board of Directors.
The District has adequate staff resources and administrative capabilities to provide the needed level of
services to the residents within its boundaries. The District avoids excessive overhead costs by operating
with a part-time administration, which provides adequate levels of service to the small community of less
than 3,000 people. The District also avoids unnecessary costs by contracting out professional services
including engineering, legal services, and other consulting services.
The District should continue to work with the development community to fund the construction of capital
infrastructure improvements that would serve new development sites. The District requires development
projects to pay administrative and connection fees, currently set at $125, and $975 per equivalent
dwelling unit (EDU).
If the SOI were expanded in the future, the District would assume fiscal responsibilities to construct or
maintain the sewer infrastructure associated with the SOI and any territories that were annexed. LAFCO
should consider the relative burden of new annexations to the District when it comes to its ability to
provide sewer service, as well as capital maintenance and replacements required as a result of expanding
the District Boundary.
Opportunities exist at the time of annexation and development to introduce alternative methods of
construction and maintenance of public or semi-public infrastructure to serve the future SOI/annexation
areas.
4.4.2 Written Determinations
1. The District avoids excessive overhead costs by operating with a part-time staff, which
provides adequate levels of service to the small community. The District also avoids
unnecessary costs by contracting out professional services including engineering, legal
services, and other consulting services.
2. The District should continue to work with the development community to fund the
construction of capital infrastructure improvements that would serve new development sites.
Goshen Community Service District MSR Page 4-16
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.5 OPPORTUNITIES FOR RATE RESTRUCTURING
The purpose of this section is to identify opportunities to positively impact rates without decreasing
service levels.
4.5.1 Fee Structure
The Goshen CSD recently (July 2004) increased rates charged for sewer service to $38 per equivalent
dwelling unit (EDU) for commercial uses, and to $32 per EDU for residential service. Table 4-2 shows a
comparison of sewer rates, and connection fees for surrounding sewer service providers. The table also
shows the relationship between monthly service charges and the average household income within the
Goshen community.
TABLE 4-2
COMPARISON OF SEWER RATES
Average
Monthly Sewer Connection
Service Provider Household Rate/Income Ratio3
User Fee (1 EDU)1 Fee1
Income2
Goshen CSD $32.00 $975 $2,359/mo. 1.36%
Earlimart PUD $7.50 $1,000 $1,775/mo. 0.42%
Ivanhoe PUD $9.50 $1,890 $2,171/mo. 0.44%
Pixley PUD $15.00 $1,800 $1,942/mo. 0.77%
Tipton CSD $8.00 $1,050 $2,198/mo. 0.36%
Cutler PUD $22.00 $3,520 $2,028/mo. 1.08%
Orosi PUD $22.97 $1,745 $2,533/mo. 0.91%
Lemon Cove SD $4.50 $500 $2,361/mo. 0.19%
London CSD $21.00 $1,990 $1,807/mo. 1.16%
Poplar CSD $25.00 $1,300 $2,043/mo. 1.22%
Richgrove CSD $18.00 $750 $1,907/mo. 0.94%
Springville PUD $35.06 $3,900 $2,023/mo. 1.73%
Strathmore PUD $14.70 $500 $2,096/mo. 0.70%
Terra Bella SMD $21.00 $500 $2,109/mo. 1.00%
Woodville PUD $17.25 $700 $2,123/mo. 0.81%
Average $18.23 $1,475 $2,098/mo. 0.87%
1) Source: Wastewater User Charge Survey Report FY 2004-05 (CalEPA – SWRCB, May 2005)
2) Source: Census 2000 data
3) Ratio is calculated by dividing the monthly sewer user fee by the corresponding average household income.
As indicated in Table 4-2, the Goshen CSD charges one of the highest monthly rate for sewer service
compared to other sewer service providers throughout the County. The cost of sanitary sewer service
within Goshen equates to approximately 1.36% of the average household income within the community.
The Goshen CSD connection fee is below average compared to other sanitary sewer service providers
throughout the County. User fees are used for the operation and maintenance costs of the Goshen CSD
sewer system. Existing customers should not be responsible for costs associated with installing and/or
upgrading infrastructure to serve new development.
Goshen Community Service District MSR Page 4-17
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
The District should periodically review its monthly user and connection fees to ensure that quality service
will continually be provided to existing and future residents. The Goshen CSD rates are currently the
highest among surrounding service providers making it difficult to justify further rate increases. The
District should review its connection fees to determine if they are adequate to support infrastructure
required for new development, including future capacity purchases from the Visalia WWTP. Connection
fees should generally be used for constructing new infrastructure and not for the operation and
maintenance of existing infrastructure.
4.5.2 Written Determinations
1. In July 2004, the Goshen CSD increased rates charged for sewer service to $38 per EDU for
commercial uses, and to $32 per EDU for residential service.
2. The Goshen CSD charges one of the highest monthly rates for sewer service compared to
other sewer service providers throughout the County. The cost of sanitary sewer service
within Goshen equates to approximately 1.36% of the average household income within the
community.
3. The Goshen CSD monthly rates are currently among the highest compared to other service
providers throughout the County making it difficult to justify further rate increases. The
District’s connection fee is below average compared to other sanitary sewer service providers
in the County.
4. The District should periodically review its monthly user and connection fees to ensure that
quality service will continually be provided to existing and future residents.
Goshen Community Service District MSR Page 4-18
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.6 OPPORTUNITIES FOR SHARED FACILITIES
The purpose of this section is to evaluate opportunities for a jurisdiction to share facilities and resources,
thereby increasing efficiency.
4.6.1 Shared Facilities
Since the location of the Goshen District Boundary is immediately adjacent to the existing City Limits of
Visalia, opportunities for shared facilities and/or resources exist. Currently, the Goshen CSD contracts
with the City of Visalia for wastewater treatment services, as the Goshen CSD does not own or operate an
independent WWTF.
At present, there is a clear distinction between the sewer infrastructure of the District, and the sewer
infrastructure of the City. As prescribed by the Wastewater Service Agreement between the City of
Visalia and the Goshen CSD,
“The City shall not contract, agree or otherwise create wastewater collection, treatment
and disposal service with any entity, corporation or individual which resides, does
business within or requests service for any parcel, building, street or property within the
boundary of the District.”
It is recommended that the District continue to coordinate with the City of Visalia with regard to sewer
planning and related issues. To eliminate the potential for duplication of services, a clear distinction
between District and City infrastructure and associated service areas should remain in tact. The
Wastewater Service Agreement between the District and the City outlines specific cases in which
interagency coordination is necessary.
Since the Goshen sewer system is generally located in roads owned and maintained by Tulare County, it
is recommended that the District work closely with the County on proposed sewer improvements that
would impact County roadways.
The District currently takes advantage of sharing staff and equipment with other service providers on an
as needed basis.
4.6.2 Written Determinations
1. Currently, the Goshen CSD contracts with the City of Visalia for wastewater treatment
services, as the Goshen CSD does not own or operate an independent WWTF.
2. At present, there is a clear distinction between the sewer infrastructure of the District, and the
sewer infrastructure of the City. To eliminate the potential for duplication of services, a clear
distinction between District and City infrastructure and associated service areas should
remain in tact.
3. The Wastewater Service Agreement between the District and the City outlines specific cases
in which interagency coordination is to occur.
4. Since the Goshen sewer system is generally located in roads owned and maintained by Tulare
County, the District should work closely with the County on proposed sewer improvements
that would impact County roadways.
5. The District currently takes advantage of sharing staff and equipment with other service
providers on an as needed basis.
Goshen Community Service District MSR Page 4-19
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.7 GOVERNMENT STRUCTURE OPTIONS
The purpose of this section is to consider the advantages and disadvantages of various government
structures to provide public services.
4.7.1 Development within SOI Areas
One of the most critical elements of LAFCO’s responsibilities is in setting logical service boundaries for
communities based upon their capability to provide services to affected lands. The Goshen CSD is
currently working toward the adoption of a Sewer System Master Plan that will help guide expansions of
and improvements to the District’s sewer system. The Master Plan will outline infrastructure
improvements to accommodate the build-out of the Goshen CSD SOI. There are no foreseeable
conditions that would indicate that development within the District’s SOI would result in a change in
government structure. There are, however, potential boundary conflicts with the City of Visalia that
could affect the governmental structure of the Goshen CSD. The implications of potential boundary
conflicts are discussed in the following section.
Tulare County LAFCO has adopted specific policies for reviewing proposals for a change in organization,
reorganization, incorporations, dissolution and other proposals processed by Tulare County LAFCO.
Tulare County LAFCO policy C-1 identifies factors and standards to be considered in review proposals
including additional requirements for City annexations, standards for annexation to special districts,
standards for the formation of special districts, and standards for City incorporation. Tulare County
LAFCO policy C-2 outlines general procedures for changes in boundaries or organization to be processed
by LAFCO. Generally, proposals for changes in boundaries, formations, or changes of organization can
be submitted for the consideration of LAFCO by petition of the registered voters or affected landowners;
however, prior to the circulation of any petition, a “Notice of Intent to Circulate” must be presented to the
LAFCO Executive Officer. A proposal may also be initiated by a resolution adopted by the governing
body of any related public body (county, city or special district). The proposal must be submitted on
forms available from the LAFCO staff office, or on the LAFCO website, along with the applicable
number of maps, legal descriptions, and filing fees to cover the proposal submitted.
Tulare County LAFCO policies C-3 and C-4 outline specific criteria for petitions for change in
organization, and protest hearings, respectively. Tulare County LAFCO policy C-5 sets forth specific
criteria for establishing, and reviewing amendment proposals to, Spheres of Influence. Policy C-5
contains criteria regarding the following items: Existing boundaries, conflicting boundaries, initial
implementation, scheduled updates – Cities, scheduled updates – Special Districts, Exceptions, separation
of communities, municipal service reviews, and also contains an MSR exemption policy. SOI
amendments shall be processed in accordance with the policies and procedures set forth by Tulare County
LAFCO.
4.7.2 Boundary Conflicts
The Goshen CSD governmental structure could be affected by the potential overlapping of boundaries
with the City of Visalia. Existing boundary conflicts between the Goshen CSD and the City of Visalia are
illustrated on Figure 4-2. The Goshen CSD has a Wastewater Service Agreement with the City of
Visalia, which sets forth specific criteria with regard to wastewater collection and treatment services
within the boundary of each agency.
Goshen Community Service District MSR Page 4-20
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
FIGURE 4-2 – CITY OF VISALIA & GOSHEN CSD BOUNDARY CONFLICTS
Source: Tulare County GIS Database
Goshen Community Service District MSR Page 4-22
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
The Wastewater Service Agreement between the Goshen CSD and the City of Visalia, which may only be
terminated upon the written consent of all parties, states the following with regard to sanitary sewer
service within the Goshen CSD Boundary.
“The City shall not contract, agree or otherwise create wastewater collection, treatment
and disposal service with any entity, corporation or individual which resides, does
business within or requests service of any parcel, building, street or property within the
boundary of the District. The City shall not renew any current contract with any entity,
corporation, industry or property for wastewater service within the District at expiration
thereof.”
The agreement does not appear to address wastewater collection services within the Goshen CSD SOI,
which in some areas overlaps with the City of Visalia SOI (refer to Figure 4-2). Boundary conflicts and
service provisions would ultimately be resolved between the City of Visalia, the Goshen CSD, and Tulare
County LAFCO.
4.7.3 Written Determinations
Development within SOI Areas
1. The Goshen CSD is currently working toward the adoption of a Sewer System Master Plan
which will help guide expansions of and improvements to the District’s sewer system. The
Master Plan will plan infrastructure improvements to accommodate the build-out of the
Goshen CSD SOI.
2. Other than potential boundary conflicts with the City of Visalia, there are no foreseeable
conditions that would indicate that development within the District’s SOI would result in a
change in government structure.
3. Tulare County LAFCO has adopted specific policies for reviewing proposals for a change in
organization, reorganization, incorporations, dissolution and other proposals processed by
Tulare County LAFCO. Any changes in organization should be in accordance with the
Policies and Procedures of Tulare County LAFCO.
Boundary Conflicts
1. The governmental structure of the Goshen CSD could be affected by the potential
overlapping of boundaries with the City of Visalia. In addition to overlapping SOI’s, the
Visalia UGB generally encompasses the entire area currently serviced by the Goshen CSD.
2. The Goshen CSD has a Wastewater Service Agreement with the City of Visalia, which sets
forth specific criteria with regard to wastewater collection and treatment services within the
boundary of each agency.
3. Boundary conflicts and service provisions should ultimately be resolved between the City of
Visalia, the Goshen CSD, and Tulare County LAFCO.
Goshen Community Service District MSR Page 4-23
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.8 EVALUATION OF MANAGEMENT EFFICIENCIES
The purpose of this section is to consider the management structure of the jurisdiction.
4.8.1 Organizational Structure
Based upon a review of information provided by the Goshen CSD, it appears that the provision of
wastewater collection is managed in an efficient manner, meeting the needs of the community and
ratepayers. The Goshen CSD has accounting and finance functions, current personnel regulations and
resolutions. The District undergoes annual audits in compliance with auditing standards.
The Goshen CSD is governed by a five-member Board of Directors elected at large from within its
boundaries that is responsible for setting policy and general administrative procedures. The District
currently operates with a part-time staff and contracts out for other services, including engineering, legal
counsel, accounting, and other consulting services. The District has the following hours of operation:
• Monday – Tuesday: 2:00 p.m. – 6:30 p.m.
• Wednesday – Thursday: 8:00 a.m. – 12:00 Noon
• Friday: 6:00 p.m. – 8:00 p.m.
The District’s part time personnel provides many functions of the District, which will likely continue in
the future because funding for full-time staff is neither needed nor cost effective for a small CSD. The
District’s answering message provides the public with the operational hours of the District; however it
does not provide contact information in case of emergencies. To make District personnel available to the
public in case of emergencies, it is recommended that the District provide an emergency contact number
on its answering message to more promptly and efficiently respond to emergency situations. It is
recommended that the District be available to respond to emergency situations during non office hours.
Based upon the District’s 2003-04 budget approximately $27,000 was appropriated for contingencies.
Contingency funds can be used for emergency improvements and/or unforeseen replacement or
rehabilitation costs.
4.8.2 Written Determinations
1. Based upon information made available, it appears that the provision of sanitary sewer
collection is managed in an efficient manner and meets the needs of the community and
ratepayers.
2. The Goshen CSD is governed by a five member Board of Directors elected at large from
within its boundaries and is responsible for setting policy and general administrative
procedures.
3. The District currently operates with a part-time staff and contracts out for other services,
including engineering, legal counsel, accounting, and other consulting services.
4. The District’s part time personnel provides many functions of the District, which will likely
continue in the future since funding for full-time staff is neither needed nor cost effective for
a small CSD.
Goshen Community Service District MSR Page 4-24
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
5. The District’s answering message does not provide contact information in case of
emergencies. To more promptly and efficiently respond to emergency situations, it is
recommended that the District provide an emergency contact number on its answering
message.
Goshen Community Service District MSR Page 4-25
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01
4.9 LOCAL ACCOUNTABILITY AND GOVERNANCE
The purpose of this section is to evaluate the accessibility and levels of public participation associated
with the Goshen CSD’s decision-making processes.
4.9.1 Public Access and Information Methods
LAFCO may consider the agency’s record of local accountability in its management of community affairs
as a measure against the ability to provide adequate services to the SOI and annexation areas.
The Goshen CSD has a five member Board of Directors elected by voters residing within the Districts
Boundary. Regularly scheduled Board meetings, which are open to the public, are held on the fourth
Thursday of each month (except in November) at 6:00 p.m. at the District office located at 6678 Avenue
308 in Goshen. Agendas for Board meetings are posted and notices provided consistent with public
meeting requirements (i.e., the Brown Act) including posting on-site. The District adopts budgets and
rate changes at hearings where the public is notified and invited.
The District should work with the Tulare County Resource Management Agency (RMA) and/or Tulare
County LAFCO to have information regarding District affairs posted on the Tulare County RMA and/or
LAFCO website. The District could provide information such as meeting times and locations, budgets,
rates, ordinances, agendas, completed/upcoming projects, and other District affairs to Tulare County for
posting on the County’s (RMA and/or LAFCO) website. It would make sense to post information
regarding District affairs on the County websites, since Goshen is an unincorporated community within
Tulare County, and there is a mutual interest in the community.
The internet is a relatively low-cost yet powerful method of involving the general
public/customers/ratepayers in District affairs. Greater dissemination of information can lead to greater
interest in attending Board meetings and participating in elections. It also allows the public, some of
whom are not physically able to attend Board meetings, to follow District activities remotely from their
home or business.
4.9.2 Written Determinations
1. The District complies with the Brown Act open meeting law by holding regularly scheduled
meetings in which the public is invited. Regularly scheduled meetings are held on the fourth
Thursday of each month at 6:00 p.m. at the District office, except for November. Agendas
for Board meetings are posted on-site at the District office.
2. The District adopts budgets and rate changes at hearings where the public is notified and
invited.
3. The District should work with the Tulare County Resource Management Agency (RMA)
and/or Tulare County LAFCO to have information regarding District affairs posted on the
Tulare County RMA and/or LAFCO website. The District could provide information such as
meeting times and locations, budgets, rates, ordinances, agendas, completed/upcoming
projects, and other District affairs to Tulare County for posting on the County’s (RMA and/or
LAFCO) website.
Goshen Community Service District MSR Page 4-26
Tulare County LAFCO MSR G1_4 Goshen Jan06.DOC/55-7301-01