CHAPTER 5 – EARLIMART PUD MUNICIPAL SERVICE REVIEW
EXECUTIVE SUMMARY
This section provides an overview of the written determinations of the Earlimart Public Utility District
(PUD) Municipal Service Review (MSR). As part of its review of municipal services, the Tulare County
Local Agency Formation Commission (LAFCO) is required to prepare a written statement of its
determination with respect to each of the following: 1) Growth and population projections for the affected
area; 2) Infrastructure needs and deficiencies; 3) Financing constraints and opportunities; 4) Cost
avoidance opportunities; 5) Opportunities for rate restructuring; 6) Opportunities for shared facilities; 7)
Government structure options; 8) Evaluation of management efficiencies; and 9) Local accountability and
governance. These requirements are established by AB 2838, the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000. The Earlimart PUD MSR identifies the following written
determinations:
Written Determinations
1) Growth and Population
1. The Earlimart CDP Boundary, as depicted in the 2003 Tulare County Data Book (Census
2000), is not consistent with the current District Boundary, indicating that the CDP
population may not be representative of the District population.
2. Census 2000 data indicates that Earlimart had a population of 6,583 as of January 2000.
According to PUD staff, the population varies between 6,000 and 8,000 persons as grape
workers are attracted to the area during summer months.
3. Between 1990 and 2000, according to U.S. Census Bureau data, the Earlimart community
grew in population from 5,881 to 6,583, corresponding to an average annual growth rate of
1.1%
4. It is likely that the Earlimart community will continue to grow at an average annual rate
between 1% and 2% depending upon land use zoning established by the Tulare County
General Plan Update and other factors. Using an average annual growth rate between 1% and
2%, the Earlimart community would reach an estimated year 2025 population between 8,450
and 10,800.
2) Infrastructure Needs and Deficiencies
Domestic Water
1. The District’s water system supports 1,485 total service connections including 57 commercial
connections, 1,424 residential connections, and 4 school connections.
2. In 2000 the District began requiring water meters for all new development but very little
development has occurred since then indicating that the majority of the District’s water
connections are currently un-metered. Water meters will also be installed on existing
properties when they change ownership.
Earlimart Public Utility District MSR Page 5-1
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
3. Assuming 1,500 equivalent dwelling units (EDUs), in order to meet Tulare County
Improvement Standards the Earlimart PUD water system would need to be capable of
delivering a combined flow rate (from all source and storage facilities) of 3,100 GPM (1,500
GPM fire flow, and 1,600 GPM domestic demand) for a period of two hours while
maintaining a minimum pressure of 25 PSI to each lot served. The District’s water system is
capable of delivering a source flow of 3,300 GPM, and includes pneumatic pressure tanks for
storage, indicating that the system currently meets the requirements of the Tulare County
Improvement Standards.
4. Based upon a calculation performed in accordance with General Order 103, published by the
California Public Utilities Commission, it is estimated that the District’s current water system
could support approximately 200 additional EDUs.
5. It is likely that the District will need to continue to repair and/or replace older pipelines in the
water system. Additionally, it is likely that the District will need to supplement its water
supply to support additional development within its SOI (i.e. the addition of wells to the
system).
6. It is recommended that LAFCO complete a comprehensive review of any water system
planning reports prior to any SOI updates to ensure that proper facilities planning has taken
place for any proposed SOI expansion area.
Sanitary Sewer
1. The Districts sewer system currently supports 1,485 total service connections including 57
commercial connections, 1,424 residential connections, and 4 school connections.
2. The District has applied for $750,000 grant to install a new sewer line. The District will need
to match the grant with $250,000. An additional 15” trunk line will be added under
Washington Street to Road 128 towards the plant, to the west of Earlimart. The District
indicated that no additional development is to be approved prior to the installation of the new
trunk line.
3. The Districts WWTF is operated under the provisions of Order No. 98-140 issued by the
California RWQCB. The District currently complies with the provisions of the Order.
4. As prescribed by Order No. 98-140, when a California registered civil engineer has certified
that the WWTF can reliably treat 1.24 MGD, the monthly average discharge shall not exceed
1.24 MGD; otherwise the monthly average discharge shall not exceed 0.80 MGD. District
staff has indicated that the average dry weather flow is approximately 0.88 MGD.
5. The District’s collection system is in adequate operating condition as there is no significant
inflow and infiltration during winter months.
6. Upon an engineers certification to reliably treat 1.24 MGD the WWTF would have additional
capacity to treat approximately 360,000 GPD. Based upon an available capacity of 360,000
GPD, it is estimated that approximately 600 additional connections (EDUs) to the system
could be supported.
Earlimart Public Utility District MSR Page 5-2
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
7. Although there is remaining capacity, the District indicated that the WWTF was constructed
in 1956 and needs upgrading including electrical upgrades. Intermediate upgrades to the plant
occurred in 1973 and 1986.
8. It is recommended that LAFCO complete a comprehensive review of any sanitary sewer
system and/or WWTF planning reports prior to any SOI updates to ensure that proper
facilities planning has taken place for any proposed SOI expansion area including funding
mechanisms for infrastructure improvements.
3) Financing Constraints and Opportunities
1. The District prepares a comprehensive and thorough annual budget that clearly describes the
services provided to residents and the funds expended for those services.
2. The District generally requires new development projects to construct the necessary
infrastructure to serve their development. A program of developer obligated infrastructure
improvements provides for the installation of physical infrastructure to serve development
sites and therefore relieves the financial obligation of the District.
3. Developers are also required to pay fees for rights to water and sewer capacity, which are
ultimately used by the District for capital capacity improvements. These fees are set by the
Board of Directors by resolution, and are allocated to a restricted reserve account.
4. The District’s budget for fiscal year 2004-05 included contingency funds of $90,070. As of
July 1, 2004, the District had a cash balance of $1,000,000, of which $300,000 is reserved for
a new water well, and $500,000 is reserved for sewer line expansions.
5. The District also generates revenue by investing its cash reserves in interest bearing accounts.
Interest earnings are not projected for the upcoming F.Y. budget, but instead are reported in
the beginning cash balance for the next F.Y. budget.
4) Cost Avoidance Opportunities
1. Each year, the District’s budget is reviewed with the District Board, District Engineer, and
General Manager to ensure that the District continues to operate within the limits of its
financial resources.
2. The District avoids unnecessary costs by contracting out professional services as needed
including engineering, legal services, and other consulting services.
3. The District should continue to work with the development community to fund the
construction of water and sewer infrastructure improvements that would serve new
development sites. The District requires development projects to pay fees for water and
sewer capacity rights, which are currently set at $1,500 and $1,000 per EDU for water and
sewer connections, respectively.
5) Opportunities for Rate Restructuring
1. The Earlimart PUD charges monthly user fees and new connection fees for water and sewer.
The fiscal year 2004-05 budget estimates revenues of $435,000 to be generated from current
water and sewer user fees.
Earlimart Public Utility District MSR Page 5-3
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
2. The Earlimart PUD rates are currently among the lowest compared to other service providers
throughout the County, which is indicative of the District’s ability to provide efficient and
affordable utility services to residents in the community. The District has not increased its
flat rate fees since 1995. The District indicated that that the fees will be re-evaluated in the
near future as a result of the need to expand the wastewater capacity and upgrade the
wastewater treatment plant.
3. The District’s budget is structured to segregate costs associated with the construction of
infrastructure to accommodate new development. Fees paid by developers are placed into a
restricted reserve account, funds which are ultimately used by the District to construct capital
capacity improvements to the District’s water and sewer systems. User fees are used for the
operations of the District and the operation and maintenance of the District’s infrastructure.
6) Opportunities for Shared Facilities
1. Since the location of the Earlimart District Boundary is immediately adjacent to existing rural
lands, the opportunity for sharing infrastructure does not readily exist.
7) Government Structure Options
1. There are no other service providers immediately adjacent to Earlimart’s SOI indicating that
the potential for duplication of services is not present. For this reason, it is logical that the
Earlimart PUD adequately plan for and assume water and sewer service within its SOI
Boundary.
2. There are no foreseeable conditions that would indicate that development within the District’s
SOI would result in a change in government structure.
3. Prior to development within its SOI area the District should complete master planning to
address the infrastructure needs of affected areas and funding mechanisms to meet those
needs. The District and/or County could also require developers to prepare specific plans
prior to approving development within the District’s SOI.
4. The District will need to continually expand and improve its water and sewer infrastructure to
accommodate development within its current District Boundary and SOI areas.
8) Evaluation of Management Efficiencies
1. Based upon information made available, it appears that the provisions of domestic water and
sanitary sewer are managed in a cost effective, efficient manner that meets the needs of the
community and ratepayers.
2. The Earlimart PUD is governed by a three member Board of Directors elected at large from
within its boundaries. The Board is responsible for setting policy and general administrative
procedures.
3. The District currently operates with a full time staff including a District Manager, an
assistant, and two maintenance technicians. The staff is readily available to respond to the
needs of customers.
Earlimart Public Utility District MSR Page 5-4
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
4. The District contracts out for other services, including engineering, legal counsel, accounting,
and other consulting services.
5. It is recommended that the District be available to respond to emergency situations during
non- business hours as well.
9) Local Accountability and Governance
1. The District complies with the Brown Act open meeting law by holding regularly scheduled
meetings in which the public is invited. Regularly scheduled meetings are held on the 10th of
each month at 3:00 p.m. at the District office. Agendas for Board meetings are posted on-site
at the District office.
2. The District adopts budgets and rate changes at hearings where the public is notified and
invited.
3. The District should work with the Tulare County Resource Management Agency (RMA)
and/or Tulare County LAFCO to have information regarding District affairs posted on the
Tulare County RMA and/or LAFCO website. The District could provide information such as
meeting times and locations, budgets, rates, ordinances, agendas, completed/upcoming
projects, and other District affairs to Tulare County for posting on the County’s (RMA and/or
LAFCO) website.
Earlimart Public Utility District MSR Page 5-5
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.0 EARLIMART PUBLIC UTILITY DISTRICT
5.0.1 Background
The requirement for Local Agency Formation Commissions (LAFCO) to conduct reviews of local
municipal services was established with the passage of AB 2838, the Cortese-Knox-Hertzberg Local
Government Reorganization Act of 2000. The bill passed the legislature, and was signed into law by
Governor Davis on September 26, 2000. Municipal Service Reviews (MSRs) provide LAFCOs with an
additional tool to fulfill their statutory responsibilities of promoting orderly growth and development,
preserving the States finite open space and agricultural land resources, and working to ensure that high
quality public services are provided to all Californians in the most efficient and effective manner. MSRs
are a requirement of State annexation law and are required to be completed before the consideration of a
Sphere of Influence (SOI) amendment or once every five years when a SOI amendment is not being
considered.
In July 2003, the Tulare County LAFCO Board adopted an MSR exemption policy, which identifies the
agencies that would be subject to a review and the extent of that review. The agencies in Tulare County
were divided into three (3) categories: agencies subject to a full comprehensive study; agencies subject to
a questionnaire study; and agencies exempt from a MSR study. The Earlimart PUD is subject to a full
comprehensive study. The policy further identifies that the services subject to review shall be:
• Police protection
• Fire protection
• Water and wastewater
• Solid waste collection and disposal
• Streets and traffic circulation
• Power generation and distribution
• Health Care
Earlimart, an unincorporated community in Tulare County, is located in the southwest portion of the
County, southwest of Visalia. The Earlimart PUD, formed in December 1954, has a primary function of
providing domestic water and sanitary sewer service to residents within the community. Domestic water
and sanitary sewer collection, treatment, and disposal are the primary services provided by the Earlimart
PUD that are subject to a municipal service review.
Earlimart is located approximately 40 miles north of the City of Bakersfield. It lies 7 miles northeast of
the City Limits of Delano. The community is long and linear in shape, and is bisected in an east-west
direction by State Route (SR) 99 and the Union Pacific Railroad tracks. Earlimart is an agriculturally
oriented service community surrounded on all sides by lands in agricultural production and vacant land.
Cities and communities surrounding Earlimart include Delano to the south, Pixley to the north, and the
communities of Ducor and Terra Bella to the east and northeast respectively, and the community of
Richgrove to the southeast. Earlimart is approximately 13 miles east of the Tulare County/Kings County
Line, and approximately 8 miles north of the Tulare County/Kern County Line. The current District
Boundary and the currently adopted SOI for Earlimart are illustrated on Figure 5-1.
Earlimart Public Utility District MSR Page 5-6
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
FIGURE 5-1 – EARLIMART PUD BOUNDARY AND SOI
Source: Tulare County GIS Database (July 2004)
Earlimart Public Utility District MSR Page 5-7
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
The following excerpt from the Tulare County LAFCO website (www.co.tulare.ca.us/lafco/info.asp)
defines a SOI and the purpose it serves.
A “Sphere of Influence” is the physical boundary and service area that a local
governmental agency is expected to serve. Establishment of this boundary is necessary to
determine which governmental agencies can provide services in the most efficient way to
the people and property in any given area. The Sphere of Influence requirement also
works to discourage urban sprawl by preventing overlapping of jurisdictions and
duplication of services.
The following discussions address the nine legislative factors required by the Cortese-Knox-Hertzberg
Act; 1) Growth and population, 2) Infrastructure needs and deficiencies, 3) Financial constraints and
opportunities, 4) Cost avoidance opportunities, 5) Opportunities for rate restructuring, 6) Opportunities
for shared facilities, 7) Government structure options, 8) Evaluation of management efficiencies, and 9)
Local accountability and governance.
5.1 GROWTH AND POPULATION
The purpose of this section is to present historical and projected growth patterns and population
projections to establish a baseline for the evaluation of the service needs of Earlimart.
5.1.1 Historical Data
The Census Bureau, on a decennial basis, identifies and provides detailed information on all incorporated
Cities along with several smaller unincorporated communities (termed Census Designated Places –
CDPs). Each census, community profiles are developed and provide a wide range of information
pertaining to population, demographics, housing information, household data, education and employment,
income and poverty, and historical trends. The Earlimart CDP Boundary, as depicted in the 2003 Tulare
County Data Book (Census 2000), is not consistent with the current District Boundary, indicating that the
CDP population may not be representative of the District population. Census 2000 data indicates that
Earlimart had a population of 6,583 as of January 2000. According to PUD staff, the population varies
between 6,000 and 8,000 persons as grape workers are attracted to the area during summer months.
Census 1990 data indicates that Earlimart had a population of 5,881 corresponding to an annual average
growth rate between 1990 and 2000 of approximately 1.1%. The unincorporated areas of Tulare County
grew from a population of 133,222 in 1990 to a population of 141,150 in 2000 corresponding to an
average annual growth rate of approximately 0.6%. It is likely that the Earlimart community will
continue to grow at an average annual rate between 1% and 2%, depending upon land use zoning
established by the Tulare County General Plan Update and other factors. Using an average annual growth
rate between 1% and 2%, the Earlimart community would reach an estimated year 2025 population
between 8,450 and 10,800.
5.1.2 Written Determinations
1. The Earlimart CDP Boundary, as depicted in the 2003 Tulare County Data Book (Census
2000), is not consistent with the current District Boundary, indicating that the CDP
population may not be representative of the District population.
2. Census 2000 data indicates that Earlimart had a population of 6,583 as of January 2000.
According to PUD staff, the population varies between 6,000 and 8,000 persons as grape
workers are attracted to the area during summer months.
Earlimart Public Utility District MSR Page 5-8
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
3. Between 1990 and 2000, according to U.S. Census Bureau data, the Earlimart community
grew in population from 5,881 to 6,583, corresponding to an average annual growth rate of
1.1%
4. It is likely that the Earlimart community will continue to grow at an average annual rate
between 1% and 2% depending upon land use zoning established by the Tulare County
General Plan Update and other factors. Using an average annual growth rate between 1% and
2%, the Earlimart community would reach an estimated year 2025 population between 8,450
and 10,800.
Earlimart Public Utility District MSR Page 5-9
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.2 INFRASTRUCTURE NEEDS AND DEFICIENCIES
The purpose of this section is to evaluate the infrastructure needs and deficiencies of Earlimart in terms of
availability of resources, capacity to deliver services, condition of facilities, service quality, and levels of
service.
5.2.1 Domestic Water
Earlimart’s water supply is derived from four 600 feet deep underground wells, which pump at a
consistent water level of approximately 250 feet. The four wells provide high quality water requiring no
chlorination or treatment. The four wells have a total maximum production efficiency of 3,300 GPM, or
4.75 MGD. Wells are located throughout the community at the following locations: one in the southern
portion of the community between Valente Road and SR 99; one located on property at the southeast
corner of Tulare Street and Elm Street; one located on property at the southwest corner of Clay Street and
Church Street; and one located on property at the corner of Mary Ann Avenue and Lane Road.
The community water system supports 1,485 total service connections including 57 commercial
connections, 1,424 residential connections, and 4 school connections. In 2000, Earlimart PUD started
requiring water meters for all new development; however, very little development has occurred since then
indicating that the majority of the Districts water system is un-metered. Water meters are also to be
installed when properties change ownership. The total water production for each well by month (for year
2003) is contained in Table 5-1 below.
TABLE 5-1
EARLIMART PUD GROUNDWATER WELL PRODUCTIONS
Month Front Street Well Tulare Street Well Clay Street Well Mary Ann Ave Well
January 2.195 mg 0 0 30.677 mg
February 2.245 mg 0 0 29.317 mg
March 4.739 mg 0.010 mg 0 30.051 mg
April 4.852 mg 0.204 mg 0 30.322 mg
May 9.370 mg 3.360 mg 4.068 mg 31.370 mg
June 13.121 mg 2.258 mg 5.229 mg 34.488 mg
July 13.690 mg 3.611 mg 14.826 mg 34.046 mg
August 12.566 mg 3.042 mg 13.419 mg 35.303 mg
September 8.521 mg 2.361 mg 11.596 mg 37.064 mg
October 4.102 mg 0.092 mg 9.980 mg 34.841 mg
November 2.629 mg 0.003 mg 0.593 mg 32.417 mg
December 2.023 mg 0 0 28.622 mg
Total Annual Production 80.053 mg 14.941 mg 59.711 mg 388.518 mg
Notes: 1) mg = million gallons
2) Source: Earlimart PUD
As indicated in Table 5-1, only two of the four wells were in production year round. The maximum
production occurred in the month of July and totaled 66.173 million gallons, or approximately 203 acre-
feet. The District indicated that engineering reports and evaluations of the water system are prepared and
updated by Keller-Wegley Engineering, Inc. After several requests, these documents have not been
provided making it difficult to make specific determinations with regard to the water infrastructure
(capacity, condition, financing, planned improvements, etc.) of the District. It is likely that the District
will need to continue to repair and/or replace older pipelines in the water system. Additionally, it is likely
Earlimart Public Utility District MSR Page 5-10
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
that the District will need to supplement its water supply to support additional development within its
SOI. It is recommended that LAFCO complete a comprehensive review of any water system planning
reports prior to any SOI updates to ensure that proper facilities planning has taken place for any proposed
SOI expansion area.
Tulare County Improvement Standards require that the construction of water source facilities shall
comply with the requirements of Bulletin No. 74, “Water Well Standards” prepared by the State of
California Department of Water Resources. The Tulare County Improvement Standards also establish
specific requirements for quantity and quality of water to be delivered to a system. Some of these
requirements are summarized below.
• The quantity of water delivered to the distribution system within a subdivision from all
source and storage facilities for a period of two hours shall be the maximum domestic
demand plus a fire flow quantity of not less than 500 GPM for single family residential, 1,500
GPM for multi-family residential, commercial, and light manufacturing, and 2,500 GPM for
heavy manufacturing.
• For systems up to 625 customer units (equivalent dwelling units) the domestic quantity shall
not be less than Q = 100 + 25 * √N, and Q = 100 + N for more than 625 customer units at
sufficient pressure to provide a minimum pressure of 25 PSI to each lot served; where Q
equals the rate of flow in GPM delivered from the combined source facilities to the
distribution system, and N equals the total number of customer units where each customer
unit is equivalent to one for a single family dwelling on a normal subdivision lot. Other types
of development shall be assigned appropriate customer unit values by the Engineer as
experience with the distribution system or locality indicates.
• The minimum source and domestic demand storage design requirements shall be in
accordance with Plate No. WS-11 of Section IV of the Tulare County Improvement
Standards.
• The quality of water supplied for human consumption shall conform to Sections 3, 4 and 5 of
the latest United States Public Health Service Drinking Water Standards. Samples will be
taken and tests made by the County Department of Health Services for bacteriological
determination of potability.
• Chemical and physical tests for potability shall be performed by a commercial laboratory
certified by the State Department of Health Services for performance of chemical and
physical analysis and the costs thereof shall be borne by the sub-divider.
Assuming 1,500 equivalent dwelling units (EDUs), in order to meet Tulare County Improvement
Standards the Earlimart PUD water system would need to be capable of delivering a combined flow rate
(from all source and storage facilities) of 3,100 GPM (1,500 GPM fire flow, and 1,600 GPM domestic
demand) for a period of two hours while maintaining a minimum pressure of 25 PSI to each lot served.
The District’s water system is capable of delivering a source flow of 3,300 GPM, and includes pneumatic
pressure tanks for storage.
An estimate of water system capacity can be calculated by using General Order 103, published by the
California Public Utilities Commission. For the estimated water system capacity, the total supply source
available is compared to a calculated total supply source required. Other factors that may affect the
capacity of water systems, including but not limited to, water quality, low pressures, required storage, age
Earlimart Public Utility District MSR Page 5-11
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
of system, and pipeline restrictions, are not considered. The estimated supply source required is
calculated using the following equation,
Q = (N)*(C)*(F) where,
Required
N = Number of customers served
C = Gallon per minute constant: 5 to 9 for flat rate systems, 2 to 5 for metered systems
F = Factor to reflect diversity (inversely proportional to the number of customers)
Using an N value of 1,485, a C factor of 6.5, and an F factor of 0.30, the estimated total supply source
required is calculated to be 2,896 GPM. With a total supply source available of 3,300 GPM, it is
estimated that the current system could support approximately 200 additional equivalent dwelling units.
These calculations indicate that the District’s water system is operating at approximately 88% of its
capacity, indicating that an additional well will be required in the near future to support additional
development.
5.2.2 Sanitary Sewer
In addition to domestic water service, the Earlimart PUD provides sanitary sewer collection and treatment
services to residents within the District. According to District staff, there are currently 1,485 connections
to the Districts sewer system including 1,424 residential connections, 57 commercial connections, and 4
school connections. Raw sewage is collected in a series of collection pipes ranging in size from 6 to 15
inches and then transported to a WWTF that is owned and operated by the Earlimart PUD. There are
three sewer lift stations in the system. The District has applied for $750,000 grant to install a new sewer
line in which the District will match the grant with $250,000 in funding. An additional 15” trunk line will
be added under Washington Street to Road 128 towards the plant, to the west of Earlimart. The District
indicated that no additional development is to be approved until the new sewer line is in place.
The District operates a WWTF located west of the community near the southeast quadrant of Avenue 56
and Road 120. The WWTF is operated under the provisions of Order No. 98-140 issued by the California
Regional Water Quality Control Board. The WWTF consists of bar screen, an aerated grit chamber, two
communitors in parallel, a clarigester, and oxidation ponds. Effluent from the oxidation ponds is stored in
three retention ponds that have a total surface area of 20 acres. Order No. 98-140 prescribes that the
monthly average discharge shall not exceed 0.8 MGD. The District indicated that recent improvements to
the plant including the construction of additional oxidation ponds have brought the plants capacity up to
1.24 MGD. As prescribed by Order No. 98-140, when a California registered civil engineer has certified
that the WWTF can reliably treat 1.24 MGD, the monthly average discharge shall not exceed 1.24 MGD.
The District currently complies with the requirements specified in Order No. 98-140.
The District has indicated that the daily flow during summer months is approximately 880,000 GPD and
about 600,000 to 700,000 GPD during winter months indicating that there is no significant inflow and
infiltration into the collection system during the winter months. This is an indication that the collection
system is in adequate operating condition. Upon an engineer’s certification to reliably treat 1.24 MGD,
the WWTF would have additional capacity to treat approximately 360,000 GPD. Based upon the
available capacity at the WWTF, it is estimated that approximately 600 additional connections (EDUs) to
the system could be supported. Although there is remaining capacity in the system, the District indicated
that the plant was constructed in 1956 and needs upgrading including electrical upgrades. Intermediate
upgrades to the plant occurred in 1973 and 1986 according to the Districts Engineer.
Several requests have been made to obtain the District’s sewer planning documents but these documents
were not made available for review at the time of this publication. It is recommended that LAFCO
Earlimart Public Utility District MSR Page 5-12
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
complete a comprehensive review of any sanitary sewer system and/or WWTF planning reports prior to
any SOI updates to ensure that proper facilities planning has taken place for any proposed SOI expansion
area including funding mechanisms for infrastructure improvements.
5.2.3 Written Determinations
Domestic Water
1. The District’s water system supports 1,485 total service connections including 57 commercial
connections, 1,424 residential connections, and 4 school connections.
2. In 2000 the District began requiring water meters for all new development but very little
development has occurred since then indicating that the majority of the District’s water
connections are currently un-metered. Water meters will also be installed on existing
properties when they change ownership.
3. Assuming 1,500 equivalent dwelling units (EDUs), in order to meet Tulare County
Improvement Standards the Earlimart PUD water system would need to be capable of
delivering a combined flow rate (from all source and storage facilities) of 3,100 GPM (1,500
GPM fire flow, and 1,600 GPM domestic demand) for a period of two hours while
maintaining a minimum pressure of 25 PSI to each lot served. The District’s water system is
capable of delivering a source flow of 3,300 GPM, and includes pneumatic pressure tanks for
storage, indicating that the system currently meets the requirements of the Tulare County
Improvement Standards.
4. Based upon a calculation performed in accordance with General Order 103, published by the
California Public Utilities Commission, it is estimated that the District’s current water system
could support approximately 200 additional EDUs.
5. It is likely that the District will need to continue to repair and/or replace older pipelines in the
water system. Additionally, it is likely that the District will need to supplement its water
supply to support additional development within its SOI (i.e. the addition of wells to the
system).
6. It is recommended that LAFCO complete a comprehensive review of any water system
planning reports prior to any SOI updates to ensure that proper facilities planning has taken
place for any proposed SOI expansion area.
Sanitary Sewer
1. The Districts sewer system currently supports 1,485 total service connections including 57
commercial connections, 1,424 residential connections, and 4 school connections.
2. The District has applied for $750,000 grant to install a new sewer line. The District will need
to match the grant with $250,000. An additional 15” trunk line will be added under
Washington Street to Road 128 towards the plant, to the west of Earlimart. The District
indicated that no additional development is to be approved prior to the installation of the new
trunk line.
3. The Districts WWTF is operated under the provisions of Order No. 98-140 issued by the
California RWQCB. The District currently complies with the provisions of the Order.
Earlimart Public Utility District MSR Page 5-13
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
4. As prescribed by Order No. 98-140, when a California registered civil engineer has certified
that the WWTF can reliably treat 1.24 MGD, the monthly average discharge shall not exceed
1.24 MGD; otherwise the monthly average discharge shall not exceed 0.80 MGD. District
staff has indicated that the average dry weather flow is approximately 0.88 MGD.
5. The District’s collection system is in adequate operating condition as there is no significant
inflow and infiltration during winter months.
6. Upon an engineers certification to reliably treat 1.24 MGD the WWTF would have additional
capacity to treat approximately 360,000 GPD. Based upon an available capacity of 360,000
GPD, it is estimated that approximately 600 additional connections (EDUs) to the system
could be supported.
7. Although there is remaining capacity, the District indicated that the WWTF was constructed
in 1956 and needs upgrading including electrical upgrades. Intermediate upgrades to the plant
occurred in 1973 and 1986.
8. It is recommended that LAFCO complete a comprehensive review of any sanitary sewer
system and/or WWTF planning reports prior to any SOI updates to ensure that proper
facilities planning has taken place for any proposed SOI expansion area including funding
mechanisms for infrastructure improvements.
Earlimart Public Utility District MSR Page 5-14
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.3 FINANCING OPPORTUNITIES AND CONSTRAINTS
The purpose of this section is to evaluate the capability of Earlimart PUD to finance needed
improvements and services.
5.3.1 Annual Budget
LAFCO should consider the ability of the District to pay for improvements or services associated with
annexed sites. This planning can begin at the SOI stage by identifying what opportunities there are to
identify infrastructure and maintenance needs associated with future annexation and development, and
identifying limitations on financing such improvements, as well as the opportunities that exist to construct
and maintain those improvements.
Based upon a review of the District’s fiscal year 2004-05 budget the District is in sound financial
condition. The fiscal year 2004-05 budget is well organized, thorough, and clearly articulates the
District’s future financial performance plans. The District prepares a traditional line item budget
document that is divided into the following categories:
• Available Resources
• Estimated Revenues
• Estimated Expenditures
o Salaries and Employee Benefits
o Services and Supplies
o Appropriations
The District adopts the budget each year and it is used as the spending plan for the District. The budget
provides a framework for the District to address the following issues: reserves, revenues, expenditures,
investments, and rates and fees. Using the fiscal year 2004-05 budget as basis for this discussion, the
District has an operating budget of $652,570 that covers salaries and employee benefits totaling $157,000;
outside services and supplies totaling $315,500; other charges totaling $90,000; and a contingency
appropriation of $90,070. “Other charges” include $60,000 allocated towards building and improvements
and $30,000 allocated towards equipment purchases. In addition, the District has $800,000 reserved for
infrastructure improvements.
The District generally requires new development projects to construct the necessary infrastructure to
serve their development. A program of developer obligated infrastructure improvements provides for the
installation of physical infrastructure to serve development sites and therefore relieves the financial
obligation of the District. Developers are also required to pay fees for rights to water and sewer capacity,
which are ultimately used by the District for capital capacity improvements including, but not limited to,
additional wells, storage facilities, or capital WWTF improvements. These fees are set by the Board of
Directors by resolution, and are allocated to a restricted reserve account.
The District’s financial constraints involve the governmental structure and the desires of the people in the
community to fund certain activities by establishing assessment districts or fees. The laws under which a
PUD is governed provide the structure for funding activities. Key revenue sources for the Earlimart PUD
include user fees, new connection fees, and property tax increments. The District also generates revenue
by investing its cash reserves in interest bearing accounts. Interest earnings are not projected for the
upcoming F.Y. budget, but instead are reported in the beginning cash balance for the next F.Y. budget.
The District had a beginning (July 2004) cash balance of $1,000,000 of which $300,000 is reserved for
the construction of a new water well, and $500,000 is reserved for sewer line expansions.
Earlimart Public Utility District MSR Page 5-15
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
On the expenditures side, the District budgets for the services paid for by residents and provides for other
expenses using property tax and, if appropriate, restricted reserve accounts. Key expenditures include
personnel, services and supplies, and pass through revenues for projects. Based upon a review of the
Districts budget for FY 2004-05, it was concluded that the District has no long term debt obligations.
5.3.2 Written Determinations
1. The District prepares a comprehensive and thorough annual budget that clearly describes the
services provided to residents and the funds expended for those services.
2. The District generally requires new development projects to construct the necessary
infrastructure to serve their development. A program of developer obligated infrastructure
improvements provides for the installation of physical infrastructure to serve development
sites and therefore relieves the financial obligation of the District.
3. Developers are also required to pay fees for rights to water and sewer capacity, which are
ultimately used by the District for capital capacity improvements. These fees are set by the
Board of Directors by resolution, and are allocated to a restricted reserve account.
4. The District’s budget for fiscal year 2004-05 included contingency funds of $90,070. As of
July 1, 2004, the District had a cash balance of $1,000,000, of which $300,000 is reserved for
a new water well, and $500,000 is reserved for sewer line expansions.
5. The District also generates revenue by investing its cash reserves in interest bearing accounts.
Interest earnings are not projected for the upcoming F.Y. budget, but instead are reported in
the beginning cash balance for the next F.Y. budget.
Earlimart Public Utility District MSR Page 5-16
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.4 COST AVOIDANCE OPPORTUNITIES
The purpose of this section is to identify practices or opportunities that may help to eliminate unnecessary
costs.
5.4.1 Fiscal Structure
The Districts budget process is designed to screen out unnecessary costs. A base budget is completed by
the General Manager for review and discussion by the Board of Directors. Each year, the District’s
budget is reviewed with the District Board, District Engineer, and General Manager to ensure that the
District continues to operate within the limits of its financial resources.
The District has adequate staff resources and administrative capabilities to provide the needed level of
services to the residents within its boundaries. The District also avoids unnecessary costs by contracting
out professional services including engineering, legal services, and other consulting services.
The District should continue to work with the development community to fund the construction of water
and sewer infrastructure improvements that would serve new development sites. The District requires
development projects to pay fees for water and sewer capacity rights, which are currently set at $1,500
and $1,000 per equivalent dwelling unit (EDU) for water and sewer connections, respectively.
If the SOI were expanded in the future, the District would assume fiscal responsibilities to construct and
maintain the water and sewer infrastructure associated with the SOI and any territories that were annexed.
LAFCO should consider the relative burden of new annexations to the District when it comes to its ability
to provide water and sewer service, as well as capital maintenance and replacements required as a result
of expanding the District Boundary.
Opportunities exist at the time of annexation and development to introduce alternative methods of
construction and maintenance of public or semi-public infrastructure to serve the future SOI/annexation
areas.
5.4.2 Written Determinations
1. Each year, the District’s budget is reviewed with the District Board, District Engineer, and
General Manager to ensure that the District continues to operate within the limits of its
financial resources.
2. The District avoids unnecessary costs by contracting out professional services as needed
including engineering, legal services, and other consulting services.
3. The District should continue to work with the development community to fund the
construction of water and sewer infrastructure improvements that would serve new
development sites. The District requires development projects to pay fees for water and
sewer capacity rights, which are currently set at $1,500 and $1,000 per EDU for water and
sewer connections, respectively.
Earlimart Public Utility District MSR Page 5-17
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.5 OPPORTUNITIES FOR RATE RESTRUCTURING
The purpose of this section is to identify opportunities to positively impact rates without decreasing
service levels.
5.5.1 Fee Structure
The Earlimart PUD charges monthly user fees and new connection fees for water and sewer. The fiscal
year 2004-05 budget estimates revenues of $435,000 to be generated from current water and sewer fees.
Tables 5-2 and 5-3 show a comparison of water and sewer rates and connection fees, respectively, for
surrounding service providers. The tables also show the relationship between monthly service charges
and average household incomes for the respective communities. Since some of the service providers
charge a metered rate for water, it is necessary to calculate an average monthly bill based upon a specific
amount of usage taken as 2,005 cubic feet, or approximately 15,000 gallons, per month for this analysis.
TABLE 5-2
COMPARISON OF WATER RATES
Average
Service Provider Sample Monthly Bill Connection Fee Household Rate/Income Ratio
Income
Earlimart PUD $12.50 $1,500 $1,775/mo. 0.70%
Ivanhoe PUD $9.50 $1,700 $2,171/mo. 0.44%
Pixley PUD $20.00 $2,000 $1,942/mo. 1.03%
Teviston CSD $30.00 $800 $2,014/mo. 1.49%
Tipton CSD $24.00 $2,800 $2,198/mo. 1.09%
Alpaugh JPA $55.00 $1,500 $1,974/mo. 2.79%
Cutler PUD $18.00 $1,500 $2,028/mo. 0.89%
Orosi PUD $19.08 $2,400 $2,533/mo. 0.75%
Lemon Cove SD $10.01 $500 $2,361/mo. 0.42%
London CSD $18.00 $1,400 $1,807/mo. 1.00%
Lindsay-Strathmore ID $14.187 T&M $2,096/mo. 0.68%
Poplar CSD $25.00 $1,750 $2,043/mo. 1.22%
Richgrove CSD NA NA $1,907/mo. NA
Springville PUD $23.42 $2,800 $2,023/mo. 1.16%
Strathmore PUD $43.30 $1,150 $2,096/mo. 2.06%
Terra Bella ID $12.438 $2,908 $2,109/mo. 0.59%
Woodville PUD $27.28 $2,000 $2,123/mo. 1.28%
Average $23.17 $1,780 $2,080/mo. 1.11%
Notes: 1) Fee information obtained from service providers
2) Average household income based upon Census 2000 data
3) Rate/Income ratio calculated by dividing sample monthly bill by average household income
4) Sample monthly bill is calculated for a typical single family dwelling
5) NA=Not Available
6) T&M=Time and Material basis
7) Based on an average of four separate rates charged by the Lindsay-Strathmore Irrigation District
8) Based on potable water service provided by the Terra Bella Irrigation District
9)Richgrove CSD and Lindsay-Strathmore ID were omitted from the average calculations
Earlimart Public Utility District MSR Page 5-18
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
As indicated in Table 5-2, the Earlimart PUD charges among the lowest monthly rates for domestic water
service compared to other service providers throughout the County. The cost of domestic water service
within Earlimart equates to approximately 0.70% of the average household income within the community.
The Earlimart PUD water connection fee is also below average compared to other domestic water service
providers throughout the County.
TABLE 5-3
COMPARISON OF SEWER RATES
Average
Monthly Sewer Connection
Service Provider Household Rate/Income Ratio3
User Fee (1 EDU)1 Fee1
Income2
Goshen CSD $32.00 $975 $2,359/mo. 1.36%
Earlimart PUD $7.50 $1,000 $1,775/mo. 0.42%
Ivanhoe PUD $9.50 $1,890 $2,171/mo. 0.44%
Pixley PUD $15.00 $1,800 $1,942/mo. 0.77%
Tipton CSD $8.00 $1,050 $2,198/mo. 0.36%
Cutler PUD $22.00 $3,520 $2,028/mo. 1.08%
Orosi PUD $22.97 $1,745 $2,533/mo. 0.91%
Lemon Cove SD $4.50 $500 $2,361/mo. 0.19%
London CSD $21.00 $1,990 $1,807/mo. 1.16%
Poplar CSD $25.00 $1,300 $2,043/mo. 1.22%
Richgrove CSD $18.00 $750 $1,907/mo. 0.94%
Springville PUD $35.06 $3,900 $2,023/mo. 1.73%
Strathmore PUD $14.70 $500 $2,096/mo. 0.70%
Terra Bella SMD $21.00 $500 $2,109/mo. 1.00%
Woodville PUD $17.25 $700 $2,123/mo. 0.81%
Average $18.23 $1,475 $2,098/mo. 0.87%
1) Source: Wastewater User Charge Survey Report FY 2004-05 (Cal EPA – SWRCB, May 2005)
2) Source: Census 2000
As indicated in Table 5-3, the Earlimart PUD charges among the lowest monthly rates for sewer service
compared to other sewer service providers throughout the County. The cost of sanitary sewer service
within Earlimart equates to approximately 0.42% of the average household income within the community.
The Earlimart PUD sanitary sewer connection fee is also below average compared to other service
providers throughout the County.
The District should periodically review its monthly user fees and connection fees to ensure that quality
service will continually be provided to existing and future residents. The Earlimart PUD rates are
currently among the lowest compared to surrounding service providers, which is indicative of the
District’s ability to provide efficient and affordable utility services to residents in the community. The
District has not increased its flat rate fees since 1995. The District indicated that that the fees will be re-
evaluated in the near future as a result of the need to expand the wastewater capacity and upgrade the
wastewater treatment plant.
The District’s budget is structured to segregate costs associated with the construction of infrastructure to
accommodate new development. Fees paid by developers are placed into a restricted reserve account,
funds which are ultimately used by the District to construct capital capacity improvements to the
Earlimart Public Utility District MSR Page 5-19
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
District’s water and sewer systems. User fees are used for the operations of the District and the operation
and maintenance of the District’s infrastructure.
5.5.2 Written Determinations
1. The Earlimart PUD charges monthly user fees and new connection fees for water and sewer.
The fiscal year 2004-05 budget estimates revenues of $435,000 to be generated from current
water and sewer user fees.
2. The Earlimart PUD rates are currently among the lowest compared to other service providers
throughout the County, which is indicative of the District’s ability to provide efficient and
affordable utility services to residents in the community. The District has not increased its
flat rate fees since 1995. The District indicated that that the fees will be re-evaluated in the
near future as a result of the need to expand the wastewater capacity and upgrade the
wastewater treatment plant.
3. The District’s budget is structured to segregate costs associated with the construction of
infrastructure to accommodate new development. Fees paid by developers are placed into a
restricted reserve account, funds which are ultimately used by the District to construct capital
capacity improvements to the District’s water and sewer systems. User fees are used for the
operations of the District and the operation and maintenance of the District’s infrastructure.
Earlimart Public Utility District MSR Page 5-20
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.6 OPPORTUNITIES FOR SHARED FACILITIES
The purpose of this section is to evaluate opportunities for a jurisdiction to share facilities and resources,
thereby increasing efficiency.
5.6.1 Shared Facilities
Since the location of the Earlimart District Boundary is immediately adjacent to existing rural lands, the
opportunity for sharing infrastructure does not readily exist.
5.6.2 Written Determinations
1. Since the location of the Earlimart District Boundary is immediately adjacent to existing rural
lands, the opportunity for sharing infrastructure does not readily exist.
Earlimart Public Utility District MSR Page 5-21
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.7 GOVERNMENT STRUCTURE OPTIONS
The purpose of this section is to consider the advantages and disadvantages of various government
structures to provide public services.
5.7.1 Development within SOI Areas
One of the most critical elements of LAFCO’s responsibilities is in setting logical service boundaries for
communities based on their capability to provide services to affected lands. There are no other service
providers immediately adjacent to Earlimart’s SOI indicating that the potential for duplication of services
is not present. For this reason, it is logical that the Earlimart PUD adequately plan for and assume water
and sewer service within its SOI Boundary. There are no foreseeable conditions that would indicate that
development within the District’s SOI would result in a change in government structure.
Prior to development within its SOI area, the District should complete infrastructure planning - including
master plans - to address the infrastructure needs of affected areas and funding mechanisms to meet those
needs. The District and/or County could also require developers to prepare specific plans prior to
approving development within the District’s SOI. The District will need to continually expand and
improve its water and sewer infrastructure to accommodate development within its current District
Boundary and SOI expansion areas.
5.7.2 Written Determinations
1. There are no other service providers immediately adjacent to Earlimart’s SOI indicating that
the potential for duplication of services is not present. For this reason, it is logical that the
Earlimart PUD adequately plan for and assume water and sewer service within its SOI
Boundary.
2. There are no foreseeable conditions that would indicate that development within the District’s
SOI would result in a change in government structure.
3. Prior to development within its SOI area the District should complete master planning to
address the infrastructure needs of affected areas and funding mechanisms to meet those
needs. The District and/or County could also require developers to prepare specific plans
prior to approving development within the District’s SOI.
4. The District will need to continually expand and improve its water and sewer infrastructure to
accommodate development within its current District Boundary and SOI areas.
Earlimart Public Utility District MSR Page 5-22
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.8 EVALUATION OF MANAGEMENT EFFICIENCIES
The purpose of this section is to consider the management structure of the jurisdiction.
5.8.1 Organizational Structure
Based upon a review of information provided by the Earlimart PUD, it appears that the provisions of
domestic water and sanitary sewer are managed in a cost effective, efficient manner, meeting the needs of
the community and ratepayers. The Earlimart PUD has accounting and finance functions, current
personnel regulations and resolutions. The Earlimart PUD undergoes annual audits in compliance with
auditing standards.
The Earlimart PUD is governed by a three-member Board of Directors elected at large from within its
boundaries. The Board is responsible for setting policy and general administrative procedures. The
District currently operates with a full time staff that includes a District Manager, an assistant, and two
maintenance technicians. The staff is readily available to respond to the needs of customers. The District
contracts out for other service’s including engineering, legal counsel, accounting, and other consulting
services.
Based upon the District’s 2004-05 budget approximately $90,070 was appropriated for contingencies.
Contingency funds can be used for emergency improvements and/or unforeseen replacement or
rehabilitation costs.
5.8.2 Written Determinations
1. Based upon information made available, it appears that the provisions of domestic water and
sanitary sewer are managed in a cost effective, efficient manner that meets the needs of the
community and ratepayers.
2. The Earlimart PUD is governed by a three member Board of Directors elected at large from
within its boundaries. The Board is responsible for setting policy and general administrative
procedures.
3. The District currently operates with a full time staff including a District Manager, an
assistant, and two maintenance technicians. The staff is readily available to respond to the
needs of customers.
4. The District contracts out for other services, including engineering, legal counsel, accounting,
and other consulting services.
5. It is recommended that the District be available to respond to emergency situations during
non- business hours as well.
Earlimart Public Utility District MSR Page 5-23
Tulare County LAFCO MSR G1_5 Earlimart Jan06.DOC/55-7301-01
5.9 LOCAL ACCOUNTABILITY AND GOVERNANCE
The purpose of this section is to evaluate the accessibility and levels of public participation associated
with the Earlimart PUD’s decision-making processes.
5.9.1 Public Access and Information Methods
LAFCO may consider the agency’s record of local accountability in its management of community affairs
as a measure against the ability to provide adequate services to the SOI and annexation areas.
The Earlimart PUD has a five member Board of Directors that is elected by voters residing within the
District’s Boundary. Regularly scheduled Board meetings, which are open to the public, are held on the
10th of each month at 3:00 p.m. at the District office located at 168 North Front Road in Earlimart.
Agendas for Board meetings are posted and notices provided consistent with public meeting requirements
(i.e., the Brown Act) including posting on-site. The District adopts budgets and rate changes at hearings
where the public is notified and invited.
The District should work with the Tulare County Resource Management Agency (RMA) and/or Tulare
County LAFCO to have information regarding District affairs posted on the Tulare County RMA and/or
LAFCO website. The District could provide information such as meeting times and locations, budgets,
rates, ordinances, agendas, completed/upcoming projects, and other District affairs to Tulare County for
posting on the County’s (RMA and/or LAFCO) website. It would make sense to post information
regarding District affairs on County websites, since Earlimart is an unincorporated community within
Tulare County, and there is a mutual interest in the community.
The internet is a relatively low-cost yet powerful method of involving the general
public/customers/ratepayers in District affairs. Greater dissemination of information can lead to greater
interest in attending Board meetings and participating in elections. It also allows the public, some of
whom are not physically able to attend Board meetings, to follow District activities remotely from their
home or business.
5.9.2 Written Determinations
1. The District complies with the Brown Act open meeting law by holding regularly scheduled
meetings in which the public is invited. Regularly scheduled meetings are held on the 10th of
each month at 3:00 p.m. at the District office. Agendas for Board meetings are posted on-site
at the District office.
2. The District adopts budgets and rate changes at hearings where the public is notified and
invited.
3. The District should work with the Tulare County Resource Management Agency (RMA)
and/or Tulare County LAFCO to have information regarding District affairs posted on the
Tulare County RMA and/or LAFCO website. The District could provide information such as
meeting times and locations, budgets, rates, ordinances, agendas, completed/upcoming
projects, and other District affairs to Tulare County for posting on the County’s (RMA and/or
LAFCO) website.