Exhibit A
GROVELAND COMMUNITY
SERVICES DISTRICT
MUNICIPAL SERVICE REVIEW AND
SPHERE OF INFLUENCE UPDATE
Prepared for:
Tuolumne LAFCo
2 S. Green Street
Sonora, CA 95370
(209) 533-5633
June 2022
Table of Contents
1 Agency Overview ..................................................................................................................... 3
1.1 History .............................................................................................................................. 3
1.1.1 Formation .................................................................................................................. 3
1.1.2 Boundary ................................................................................................................... 3
1.1.3 Services ..................................................................................................................... 3
1.2 Government Structure ....................................................................................................... 4
1.2.1 Governing Body ......................................................................................................... 4
1.2.2 Transparency and Accountability ............................................................................... 5
1.3 Operational Efficiency ....................................................................................................... 5
1.3.1 Management and Staffing .......................................................................................... 5
1.3.2 Agency Performance ................................................................................................. 6
1.3.3 Regional and Service-Specific Participation ............................................................... 7
1.3.4 Shared Facilities, Resources and Services ................................................................ 7
1.3.5 Government Restructure Options ............................................................................... 8
1.4 Finances ........................................................................................................................... 8
1.4.1 Current Fiscal Health ................................................................................................. 8
1.4.2 Long Term Financial Considerations ........................................................................ 11
1.5 Growth ............................................................................................................................ 13
1.5.1 Present and Planned Land Use and Development ................................................... 13
1.5.2 Existing Population and Projected Growth ............................................................... 13
1.6 Disadvantaged Unincorporated Communities ................................................................. 14
2 INTRODUCTION ................................................................................................................... 16
2.1 Local Agency Formation Commission ............................................................................. 16
2.2 Tuolumne LAFCo ............................................................................................................ 16
2.3 Municipal Service Review ............................................................................................... 16
2.4 Sphere of Influence ......................................................................................................... 17
2.5 Description of Public Participation Process ..................................................................... 17
2.6 California Environmental Quality Act ............................................................................... 18
2.7 Senate Bill 215 ................................................................................................................ 18
3 MUNICIPAL SERVICE REVIEW ............................................................................................ 19
3.1 Service Overview ............................................................................................................ 19
3.1.1 Services ................................................................................................................... 19
3.1.2 Service Areas .......................................................................................................... 19
3.2 Water .............................................................................................................................. 20
3.2.1 Service Overview ..................................................................................................... 20
3.2.2 Water Demand and Capacity ................................................................................... 21
3.2.3 Operations and Capital Needs ................................................................................. 25
3.2.4 Water Infrastructure Needs and Deficiencies ........................................................... 25
3.3 Wastewater ..................................................................................................................... 26
3.3.1 Service Overview ..................................................................................................... 26
3.3.2 Wastewater Collection, Treatment and Disposal ...................................................... 27
3.3.3 Operations and Capital Needs ................................................................................. 29
3.3.4 Regulatory Environment .......................................................................................... 29
3.4 Fire Protection and Emergency Services ........................................................................ 30
3.4.1 Service Overview ..................................................................................................... 30
3.4.2 Facilities and Assets ................................................................................................ 31
3.4.3 Service Adequacy .................................................................................................... 31
3.4.4 Operations and Capital Needs ................................................................................. 32
3.5 Parks and Recreation ..................................................................................................... 35
3.5.1 Service Overview ..................................................................................................... 35
3.5.2 Operations and Capital Needs ................................................................................. 35
3.6 Determinations ................................................................................................................ 36
3.6.1 MSR Review Factors ............................................................................................... 36
4 SPHERE OF INFLUENCE ..................................................................................................... 42
4.1 SOI Update ..................................................................................................................... 42
4.1.1 Existing Sphere of Influence .................................................................................... 42
4.1.2 Study Areas ............................................................................................................. 42
4.1.3 Proposed SOI Changes ........................................................................................... 45
4.1.4 Consistency with LAFCo Policies ............................................................................. 45
4.2 Determinations ................................................................................................................ 46
4.2.1 Land Uses ............................................................................................................... 46
4.2.2 Need for Facilities and Services ............................................................................... 46
4.2.3 Capacity of Facilities and Adequacy of Services ...................................................... 47
4.2.4 Communities of Interest ........................................................................................... 47
4.2.5 Disadvantaged Unincorporated Communities .......................................................... 48
5 REFERENCES ...................................................................................................................... 49
6 ACRONYMS .......................................................................................................................... 51
7 ACKNOWLEDGEMENTS ...................................................................................................... 53
7.1 Report Preparation.......................................................................................................... 53
7.2 Assistance and Support .................................................................................................. 53
FIGURES ...................................................................................................................................... 54
1 AGENCY OVERVIEW
1.1 HISTORY
1.1.1 Formation
The Groveland Community Services District (GCSD/District) was formed in accordance with
California GC §61000 on August 19, 1953 by the State Board of Equalization (BOE) to bring much
needed utility services to the Groveland and Big Oak Flat area. Resolution Number 9 of the
Tuolumne County Board of Supervisors approved the formation of the Groveland Community
Services District on August 19, 1953 (Tuolumne County 1953).
1.1.2 Boundary
The GCSD service area covers approximately 15 square miles in southern Tuolumne County. The
District is bounded on the north by the Tuolumne River, on the south by Mariposa County, on the
east by the Stanislaus National Forest, and on the west by Moccasin. (Figure 1)
The GCSD service area encompasses the community of Groveland, including the Pine Mountain
Lake Subdivision and Big Oak Flat. The Communities of Groveland and Big Oak Flat are located
approximately 25 miles southeast of Sonora on State Highway 120. Property owners within the
District boundaries receiving general services such as water, sewer, park/recreation, community
fire protection and emergency services are considered customers of the District (Tuolumne County
LAFCo 2013).
The GCSD service boundary and SOI boundary are not coterminous. The GCSD is surrounded
mainly by land zoned for agricultural and rural residential uses and public lands (lands managed by
the United States Forest Service (USFS) and Bureau of Land Management (BLM). The SOI
boundaries consist of an additional 11,777 acres surrounding the current District service
boundaries (Figure 2). The residential development potential discussed above is located within the
SOI and could require annexation to the District in the future.
1.1.3 Services
The GCSD is a multi-purpose special district providing water, sewer, fire and emergency, and park
and recreation services. In January 2006, LAFCo enumerated the latent powers of the GCSD as
follows:
1. Supply water for any beneficial uses, in the same manner as a municipal water district, formed
pursuant to the Municipal Water District Law of 1911, Division 20 (commencing with §7100) of
the Water Code. [GC §61100(a)]
2. Collect, treat, or dispose of sewage, wastewater, recycled water and storm water in the same
manner as a sanitary district, formed pursuant to the Sanitary District Act of 1923, Division 6
(commencing with §6400) of the Health and Safety Code. [GC §61100(b)]
3. Provide fire protection services, rescue services, hazardous material emergency response
services, and ambulance services in the same manner as a fire protection district, formed
pursuant to the Fire Protection District Law, Part 2.7 (commencing with §13800) of Division 12
of the Health and Safety Code. [GC §61100(c)]
4. Provide emergency medical services pursuant to the Emergency Medical Services System and
the Prehospital Emergency Medical Care Personnel Act, Division 2.5 (commencing with §1797)
of the Health and Safety Code, except ambulance service. [GC §61100(n)]
5. Acquire, construct, improve, maintain, and operate recreation facilities, including, but not limited
to, parks and open space, in the same manner as a recreation and park district formed
pursuant to the Recreation and Park District Law, Chapter 4 (commencing with §57800) of
Division 5 of the Public Resources Code. [GC §61100(e)]
6. Organize, promote, conduct and advertise programs of community recreation, in the same
manner as a recreation and park district formed pursuant to the Recreation and Park District
Law, Chapter 4 (commencing with §57800 of Division 5 of Public Resources Code. [GC
§61100(f)]
7. Acquire, construct, improve, maintain, and operate community facilities, including but not
limited to, community centers, libraries, theaters, museums, cultural facilities and child care
facilities. [GC §61100s)]
1.2 GOVERNMENT STRUCTURE
1.2.1 Governing Body
The Board of Directors is the legislative body for the District and is responsible for establishing and
implementing policy, adopting and amending the annual budget, enacting ordinances, and
appointing committees. The GCSD is governed by a 5-member Board of Directors elected at-large
to serve staggered, four-year terms (Table 1-1). If there are insufficient candidates for election, or if
the number of filed candidates is equal to the number of vacancies, then Board members may be
appointed in lieu of election by the County Board of Supervisors.
The Board of Directors elects officers annually, including a President and Vice-President. The
Board may create additional offices and elect Board members to those offices, provided that no
member of a Board of Directors shall hold more than one office. Board members receive
remuneration at a rate set annually by the Board, including regular or special meetings, trainings,
conferences or seminars, negotiation sessions, depositions or meetings with District consultants,
engineers, or other professionals for the purpose of conducting District business or potential
business and other activities as approved by the Board, in accordance with Community Services
District Law Section 61047(a), with a maximum of six paid meetings per month, and not to exceed
72 paid meetings per year by District policy. Board members may also receive reimbursement
within the limits of the annual budget and in accordance with board policy for their actual and
necessary traveling and incidental expenses while on official business. Staff support for the Board
includes the General Manager, contract attorney, contract auditor and contract engineer.
Table 1-1: GCSD Governing Body
Name Role Term Began Term Expires
Janice Kwiatkowski President December 2018 November 2024
Nancy Mora Vice-President December 2018 November 2024
John Armstrong Director December 2018 November 2022
Spencer Edwards Director December 2018 November 2022
Robert Swan Director December 2018 November 2022
Source: GCSD 2020c.
1.2.2 Transparency and Accountability
Regularly scheduled meetings for the District Board of Directors are held on the second Tuesday of
the month starting at 10:00 a.m. at the District office located at 18966 Ferretti Road in Groveland.
In accordance with the Brown Act, all meetings are open to the public and are publicly posted a
minimum of 72 hours prior to regular meetings or a minimum of 24 hours prior to special meetings.
Public notice and meeting information including agendas, meeting minutes, reports, resolutions,
and ordinances are published on the District’s website and are available at the District’s office upon
request. An agenda email list is maintained and agenda materials are distributed to the list when
available publicly. Minutes are kept for all public Board meetings and are adopted at a subsequent
meeting. The District maintains a website with pertinent documents and agenda materials at
https://www.gcsd.org/.
The GCSD maintains customer-oriented programs including posting publication of articles about
District activities on its website and in local publications. The GCSD solicits customer feedback and
comments from property owners within the District. The agendas for the meetings are posted at
several public places at least 72 hours prior to a Board Meeting and a list of persons requesting
notification of agenda posting is maintained by the District and agendas are emailed on
preparation. Meeting agendas and minutes are also available at the front desk in the GCSD office
and on the District’s web site.
Customers may submit verbal comments or complaints in person or by phone at the District office
during regular business hours, Monday through Friday, 8:00am to 4:00pm, or at the Board of
Director’s meetings during the general public comment period. Complaints are addressed in
person by District staff. The District also has an active presence on social media including
Facebook, Instagram, Next Door and Twitter.
The Political Reform Act requires all state and local government agencies to adopt and promulgate
a Conflict of Interest Code pursuant to Government Code §81000 et seq. The Act also requires
persons who hold office to disclose their investments, interests in real property, and incomes by
filing a Statement of Economic Interests (Fair Political Practices Commission Form 700) each year
pursuant to Government Code §87203. The District updated its Conflict of Interest Policy in 2020,
and is in compliance with the policy, including the timely filing of Form 700 by those identified in the
Policy.
According to AB 1234, if a local agency provides compensation or reimbursement of expenses to
local government officials, then all local officials are required to receive two hours of training on
public service ethics laws and principles at least once every two years and establish a written
policy on reimbursements pursuant to Government Code §53235. The District has an appropriate
written policy on reimbursements and all directors and the General Manager are current on the
Ethics training requirements.
1.3 OPERATIONAL EFFICIENCY
1.3.1 Management and Staffing
The GCSD Board of Directors oversees the General Manager who is a regular, full time employee
responsible for administration of the day-to-day operations of the District. Through the General
Manager, the Board of Directors also oversees a contract attorney, contract auditor and the
contract engineer. The General Manager oversees three departments: Administrative-Services,
Fire (staffed and managed by CAL FIRE), and Operations. Three individuals report directly to the
General Manager, including the Administrative Services Manager, the CAL FIRE Unit Chief and
the Operations Manager (GCSD 2019a).
The GCSD has reduced its staff from 33 full time employees in 2007, to 23 full time employees in
2012, and to 21 full time employees in 2021. The GCSD now employees 21 full time employees
and 3 independent consultants used regularly on an as needed basis. (the attorney, accounting
firm and engineer are not employees and serve as technical advisors to the District). There are
also two part-time resident fire inspectors and two part-time resident firefighters positions on the
District organizational chart, that are managed by CALFIRE and paid by the District when grants
and budgeted funds are available to fill the positions. (Table 1-2).
Table 1-2: Management and Staffing
Contract
Personnel Groups FTE PTE Consultants
Administrative 6 0 3
Operations 15 0 0
Fire1 0 4 0
Totals 21 4 3
Notes: 1 Fire personnel are managed and paid by CalFire under the contract funded by the District.
The inspectors and resident firefighters are are paid by the District directly
Source: GCSD 2019a.
1.3.2 Agency Performance
The GCSD strives for maximum budget efficiency through the annual budget preparation and
performance monitoring process and maintains a balanced budget for its enterprise services of
water and wastewater. The District produces an annual Management Discussion and Analysis
(MD&A) that outlines the financial condition of all services provided by the District and action plans
to address revenue deficiencies in its Park and Fire government type services. Capital
improvements are planned for during the budget process. Additionally, the Board of Directors
reviews and revises the District’s goals and objectives each quarter and during the budget
development process.
A component of agency performance is evaluating staff productivity, efficiency, safety and
service/work quality. The General Manager oversees three departments: Administrative Services
Department, Fire Department (staffed by CAL FIRE), and the Operations Department. The District
tracks employee workload through timesheets and software programs and conducts annual written
performance evaluations for all employees. An employee portal and related software is in place to
document and measure employee performance to established goals including training, certification,
attainment of skills and other achievements. The Board of Directors holds quarterly public
workshops during which they review the status of established goals and objectives assigned to the
General Manager for implementation and make amendments and updates as needed. The
performance of the General Manager is weighed annually against attainment of measurable goals
and objectives. Fire department performance is monitored by reviewing monthly emergency call
volume and trends, and call types and locations are reviewed on an annual basis.
Training
The Board of Directors has adopted an Excellence in Board Governance program that outlines the
required and recommended training and educational conferences supported and encouraged for
all Board members to attend. The Board members attend training through webinars, workshops,
and conferences as well as regularly reviewing and updating the District’s Adopted Board Norms
and Protocols. Trainings include Ethics, Brown Act, The Great Board, Special District Governance,
General Manager Evaluation, Board Member training, Finance training, District Liability,
Harassment Prevention, and Good Governance training, Conferences include Special District
Leadership Academy and California Special Districts Association (CSDA) annual conference. The
Board Secretary attends the CSDA Board Secretary Conference, covering topics of Brown Act
Compliance, California Public Records Act, recording minutes, Board Member Liability, Online ADA
Compliance, Transparency, Understanding Special District Laws, and Staying in Compliance.
The General Manager achieved certification as a Certified Special District Manager in 2010 and
maintains this certification through required ongoing education and training including the annual
CSDA conference and General Manager Leadership Summit. Administration staff including the
General Manager and Department Managers receive training such as Ethics, Harassment
prevention, personnel management, employee supervision and leadership, and attendance at the
annual General Manager Leadership Conference which provides the best networking and
professional development opportunities for special district general managers and other
management staff from districts of all types and sizes throughout California.
GCSD Administrative, Operations and Maintenance staff are trained and certified on a biannual
basis in CPR-First Aid.
Operations and Maintenance staff are trained and Certified in Traffic Control, Trench and Shoring,
Confined Space, Bucket Truck training and FROST Fit testing annually. Operators attend an onsite
staff safety meeting on a weekly basis to go over important topics given by the Special District Risk
Management Authority (SDRMA), as well as attend training courses through SDRMA’s Target
Solutions, a safety training library and documentation program. Operators’ off-site training includes
state certification preparation, Safety Day offered by SDRMA and Water Expo through Clean Water
Environment Association (CWEA).
1.3.3 Regional and Service-Specific Participation
The GCSD provides structural fire protection and emergency services, water service, sewer
service, park/recreation services and community facilities management to the areas of Big Oak
Flat, Groveland and Pine Mountain Lake. Other service providers/districts in these areas include
the County of Tuolumne, the Tuolumne County Resource Conservation District, and a County-wide
ambulance district known as the Tuolumne County Ambulance Service (Tuolumne County LAFCo
2013).
The GCSD has a significant degree of interdependence with the surrounding area due to the
services provided and the mutual aid provided to other fire protection agencies in the County, CAL
FIRE and the USFS. Often the fire department responds outside its boundaries in accordance with
mutual aid agreements (GCSD 2020a).
The Department is a signatory to the Tuolumne County Mutual Aid Plan and the State of California
Master Mutual Aid Agreement. Under the County Plan, every fire agency agrees to provide free
assistance to any other County fire agency upon request, as available. For the District, however,
given its remote location at the top of Priest Grade, there are no mutual aid resources available
within approximately 20-30 minutes travel time other than the CAL FIRE Groveland Station
resources, when available. In addition, the District is signatory to the Automatic/Mutual Aid
Agreement between Tuolumne County, Mariposa County, and Stanislaus Consolidated Fire, as
well as an Assistance-by Hire Agreement with the CAL FIRE Tuolumne-Calaveras Unit.
1.3.4 Shared Facilities, Resources and Services
The GCSD works collaboratively with other service providers to deliver services more effectively or
efficiently by maintaining several mutual aid and automatic aid agreements.
• Mutual Fire Aid is provided to all other fire protection agencies in the County, CAL FIRE and
the USFS.
• An agreement with the Tuolumne Utilities District to respond to calls for mutual water and
sewer service aid in case of emergency situations.
• A Memorandum of Understanding (MOU) with Tuolumne County for operation of the
Groveland Youth Center which is now located within the Mary Laveroni Community Park.
1.3.5 Government Restructure Options
The District is the primary municipal service provider in the area. The District is entirely
unincorporated with the planning jurisdiction in the hands of Tuolumne County. The GCSD
provides water, wastewater, fire protection and EMS, community facilities and park and recreation
services. Law enforcement, code enforcement, transportation, and stormwater collection systems
are provided by the County of Tuolumne. Since neither Groveland or Big Oak Flat are incorporated
cities, public service districts, such as the GCSD, appear to be an excellent way to ensure effective
community representation and accountability, public funds and operations transparency, and public
participation high while at the same time maintaining consistent and adequate service levels.
Consolidation of these services in a Community Services District is an efficient way to provide
these services.
The Groveland Lighting District was created in 1919 to place electric lights in the downtown
Groveland area of Tuolumne County. Lighting districts are commonly used by local governments to
fund the costs of lighting in public areas. Many districts’ funding can also be used to finance
improvements such as parks, auditoriums or other public infrastructure. Each lighting district
receives its own ad valorem property tax allocations, which pays for its expenses. The County of
Tuolumne currently operates the Groveland Lighting District. To obtain new lighting in the Mary
Laveroni Park, or in downtown Groveland, the request must be approved by the County
Administrator.
The GCSD boundaries overlap the boundaries of the Groveland Lighting District. A 2011 Grand
Jury Report recommended a manager be hired to manage and oversee the County’s lighting
districts. The Groveland Lighting District could reorganize to be a part of the GCSD, which would
then be responsible to maintain lighting, add lighting, and fund public improvements related to
lighting. Such a reorganization would consist of an activation of latent powers for GCSD and
concurrent dissolution of the Groveland Lighting District.
1.4 FINANCES
1.4.1 Current Fiscal Health
The GCSD prepares and adopts an annual budget prior to the beginning of the fiscal year (July 1),
which serves as a financial planning tool and an expense control system. Expenses cannot exceed
authorized budget amounts unless the budget is amended by the Board of Directors by resolution.
The District has annual audited financial statements prepared by a Certified Public Accountant
(CPA) which serves as financial assurance for the use of public funds.
Table 1-3 provides year-end financial information for the District. This table summarizes the
Statement of Activities included in the reference fiscal year audits. Refer to the following hyperlink
from the District’s website to download full copies of the District’s FY 2018-19 Audit:
https://www.gcsd.org/fy-2018-19-audited-financial-statements.
Table 1-3: GCSD Financial Summary
FY 15-16 FY 16-17 FY 17-18 FY 18-19 FY 19-20
Beginning Aggregated Net
Position 9,274,140 9,486,579 9,563,414 10,686,304 11,533,780
Ending Aggregated Net
Position 9,486,579 10,735,238 10,686,304 11,533,780 12,717,057
Revenue
General Revenue
Property Taxes 1,071,197 1,101,047 1,133,799 1,180,524 1,223,172
Interest earnings 6,717 17,833 17,697 56,162 77,989
Other Revenues 93,105 54,963 75,987 84,959 164,673
Loss on disposal of capital
asset - - - (72,612) -
Sub-total 1,171,019 1,173,843 1,227,483 1,249,033 1,465,834
Program Revenues
Administration - - - - -
Fire - - - - -
Parks and Recreation 1,485 1,980 1,845 1,710 2,515
Water 2,603,079 3,168,754 3,165,584 3,184,980 3,256,867
Wastewater 1,867,943 1,862,515 1,862,027 2,023,058 2,283,618
Operating -
Grants/Contributions - - - -
Capital 431,844
Grants/Contributions - 868,469 348,699 410,016
Sub-total 4,472,507 5,901,718 5,414,155 5,619,764 5,974,844
Total Revenue 5,643,526 7,075,561 6,641,638 6,868,797 7,440,678
Expenses
Administration - - - - -
Fire 1,045,990 1,148,932 1,024,815 1,274,331 1,585,136
Parks and Recreation 83,112 96,952 109,500 331,678 167,847
Water 2,561,328 2,676,791 2,420,904 2,516,717 2,791,551
Davis-Grunksy 989 356 271 (113) (314)
Wastewater 1,739,668 1,903,871 1,963,312 1,898,708 1,713,181
Total Expenses 5,431,087 5,826,902 5,518,748 6,021,321 6,257,401
Change in net position 212,439 1,248,659 1,122,890 847,476 1,183,277
Accumulated Depreciation 21,207,035 22,471,590 23,488,758 24,170,344 25,200,758
Source: GCSD Consulting CPA Gilbert and Associates Summary Spreadsheet with Notes
The GCSD employs various cost-avoidance practices in its daily operations and practices. The
District has taken numerous actions in the last five years to save money and lower expenses. Cost
saving practices include investing in infrastructure and equipment replacement, seeking grant
funding opportunities, project performance tracking, and appropriately increasing water and
sewage rates.
According to planned land uses in the GCSD’s service area and its SOI, water and wastewater
treatment plants and infrastructure will likely require improvements to accommodate growth and/or
to meet new regulations.
Water Rates
The current water rates for the GCSD include a fixed rate charge, a usage rate and a District-wide
debt service charge. The fixed rate charge is dependent upon the size of the meter, as shown in
the District's current published rate structures, A current water rate schedule is posted on the
GCSD website.
The District also charges a Usage (Variable) Rate with the cost per gallon depending on the
number of gallons of water that are used in a month. A current schedule of water consumption
rates is published on the District website. As is indicated by the figures above, the per gallon price
of water increases as the amount of water usage increases (GCSD 2019c).
In addition to monthly rates, all water customers are required to pay a 1996-1998 Capital Facilities
Bond Fee of $9.83 and a 2007 Water Debt Service Fee of $10.75 for each water service
connection, per month, to pay off water system improvement loans incurred in 1997 and 2007.
These loans will be paid off in March 2026 and July 2027, respectively (Tuolumne County LAFCo
2013).
2021 Water Debt Service (formerly called the 2013 Water Debt Service and 2014 Water Debt
Service)
The District issued the 2021 Water Revenue Refunding Bond dated December 8, 2020 in the
amount of $3,594,320 with an interest rate of 2.35% to refinance the remaining balance on the
Water Revenue Refunding Bonds, Series A, 2013 Installment Sale Agreement and Series B, 2014
Installment Sale Agreement. Payments are due semiannually in July and January. Final maturity
for Series A is July 10, 2026 and July 10, 2027 for Series B. The refunding reduced the District’s
debt service loan amount by $126, 733. A $15.57 charge is billed monthly to all water service
connections.
Sewer Rates
The sewer fees consist of a monthly fixed rate service charge and a monthly usage (variable)
charge. A current schedule of water consumption rates is published on the District website.
The District issued the 2019 Wastewater Revenue Refunding Bond (2019 Wastewater Refunding)
dated December 10, 2019 in the amount of $1,906,811 with an interest rate of 2.840% to refinance
the remaining balance on the Wastewater Revenue Refunding Bonds, Series 2014 bond (2014
Wastewater Revenue Refunding). Payments are due semiannually on July 10 and January 10.
Final maturity is on July 20, 2026. The refunding reduced the District’s debt service loan amount
by $483,155 and provided for an economic gain (difference between the present value of the old
and new debt service payments) of approximately $71,543 in aggregate savings through the end of
the loan term in 2026.
A $20.42 fee is billed monthly to each sewer service connection that are tributary to Lift Station 7,
which serves parcels in the Pine Mountain Lake Subdivision.
A 2018 Sewer Rate Study determined that adopted rate schedule above would generate adequate
revenue through the District’s connection and service charges to keep up with its operation and
maintenance costs and to dedicate capacity to new connections (GCSD 2018a).
It is the GCSD Board’s policy to establish rates for water and sewer that cover the cost of system
operation, maintenance, improvement and replacement. The GCSD charges a fixed rate charge, a
usage rate and a District-wide debt service charge as discussed above. Other sources of revenue
are sought to off-set customer water and sewer rates such as seeking grant funding. .
Fire Services
GCSD funds a minimum staffing of five full time firefighters through its cooperative agreement with
CALFIRE. This staffing level provides for an engine staffed with two full time personnel living at the
GCSD fire station every hour of every day throughout the year. During the winter months, the
County also provides emergency services through CAL FIRE’s Amador station located on Merrill
Road. An Amador station is a CAL FIRE station, with CAL FIRE staff and equipment. The cost of
running the station is borne by the state during fire season. The current contract is for a three-year
term at a budgeted amount of $263,466 a year. The funding for non-fire season staffing provides
for a second staffed fire engine serving the Hwy 120 corridor.
In 2019, the Tuolumne County Board of Supervisors was informed by GCSD of the challenges
involved with affording the cost of providing fire services and the difficulty in providing emergency
responses to developing areas and increasing call volumes outside the District boundaries and
SOI; and outside the mutual aid response area for GCSD. At that time, the GCSD General
Manager had stated that within three years GCSD will find themselves in a difficult place to afford
to fund the CAL FIRE contract for fire services both at the GCSD fire station and that are provided
at the CAL FIRE station in Groveland. Due to the evaluation of several land use projects that could
utilize the mutual aid response of GCSD fire resources, as well as identified concerns with the
financial and staffing level of the department, the GCSD Board directed in 2019 the preparation of
a Fire Services Master Plan update. The Master Plan findings and recommendations are detailed
in Section 3.4 below. One recommendation in the Fire Master Plan directed the District General
Manager to work with the County towards future fire revenues and/or services to offset the fire
service/response time impact of new development and increasing call volumes. In considering the
financial issues GCSD is facing and that the County does not provide any fire services along the
Groveland SR-120 corridor, on September 22, 2020, the County approved an allocation of
$263,466 to provide finding for the Groveland Amador station removing that financial responsibility
from GCSD. The action allowed the County to move towards their goal of providing financial relief
to GCSD in providing current fire service levels, and with the recognition that there is an identified
need for additional first responder services along the SR-120 corridor. The County’s payment for
the three-year contract relieved GCSD of a cost of over $790,000 to other needs within the District.
(ESA 2020)
1.4.2 Long Term Financial Considerations
Public Debt and Bonds
The GCSD has incurred outstanding public debt for purchases, upgrades or replacement of capital
improvements such as storage tanks, water and sewer lines, and water treatment facilities, ump
stations, and wastewater treatment plant upgrades.
In 1996, bonds totaling $4,600,000 were issued for the purpose of acquisition, construction and
improvement of water storage and treatment facilities for the District. Increased population and
State Health Department standards necessitated the addition of storage and water treatment
capacity to be provided by the construction of two new storage tanks with related water treatment
facilities. The project financing included the acquisition of land for one water storage site as well as
engineering costs and costs of issuance of the securities. This bond was refinanced in 1998 (1998
and 2014 Refunding Bonds) and refinanced in 2021 through an installment sales agreement to
acquire lower interest rates and will be paid off in March 2026. Revenue is collected on each
customer's water bill
In 2007, the District issued an additional $9,560,000 in bond/debt for various water and sewer
capital projects as follows:
• 2007 Water Installment Sale Agreement – La Salle Bank National Association: incurred a
debt of $5,031,000 in May 2007 to pay for federal and State-mandated disinfection
upgrades to the two water treatment plants, construction of an alternative water supply
system, and upgrades to the radio telemetry and control system (SCADA). The GCSD is
collecting a $10.75 per month Water Debt Service Fee from each customer to help repay
this debt. This debt was refinanced for cost savings in 2014 and again in 2021, and will be
paid off in July 2027, which was the original payoff date prior to refinancing.
• 2007 Sewer Installment Sale Agreement—La Salle Bank National Association: a debt of
$4,529,000 was incurred in June 2007 to pay for State-mandated upgrades to the District’s
sixteen sewer lift stations. A monthly Wastewater Debt Service Fee of $25.75 is charge to
all wastewater customers tributary to Lift Station 7 to help repay this debt. This debt was
refinanced for cost savings in 2014 and again in 2020, and will be paid off in 2026, which
was the original payoff date prior to refinancing. Lift Station 16, which serves Big Oak Flat,
was not included as a part of this indebtedness and was not upgraded as part of the 2007
debt issuance and was ultimately upgraded in 2016 with a grant from the Department of
Water Resources for $349,424.
• In 2008, a Commercial Loan, from Rabobank in the amount of $35,586 was incurred as a
business loan to finance vehicle replacement and was paid off in September 2013.
• In 2019, a Commercial Loan through the Municipal Finance Corporation in the amount of
$1,525,000 for immediately required Wastewater Treatment Plant Improvements (2019)
with annual payments of $105,234 and scheduled to be paid off in 2039. This Installment
Sales Agreement was included with the refinancing of the 2014 Sewer Bonds detailed
above. Revenue from wastewater rate increases approved in 2018 fund the annual loan
payments.
Most of the District’s debt was incurred to upgrade facilities and infrastructure improvements as
mandated by regulating federal and State authorities, to replace failed facilities and equipment and
to improve operating efficiencies. The existing debts detailed above are repaid through a per lot
water stand-by fee, debt service charge, and allocation of water/sewer enterprise funds. The
GCSD has never defaulted on repayment of any bonds or other debt (Tuolumne County LAFCo
2013).
Reserve Funds
The GCSD’s reserve funds, categorized in the Operational Policies and Procedures Manual
(Manual) adopted by the Board in October of 2010, are Designated Reserve for capital
improvements, Designated Reserve for operating and other contingencies, and Restricted Debt
Service Reserve. The Manual defines the Operational Reserve as funds allocated for the purpose
of paying the costs and expenses associated with unanticipated events including but not limited to:
temporary cash flow shortages, repair/replacement of facilities, equipment, supplies or
infrastructure resulting from a catastrophic event, or expenditures required to respond to an
emergency which threatens public health and safety. Funds allocated to the Operational Reserve
may also be used to pay damage claims against the District which are not covered by insurance.
The Board of Directors may authorize expenditure of the funds allocated to the Operational
Reserve on any expenses that may be incurred during the fiscal year for which no specific
appropriation has previously been made.
The Manual also stipulates that in a State of Emergency, or in a local emergency as defined by GC
§8558, the Board of Directors may temporarily transfer funds from the Operational Reserve to the
District’s General Fund to fund those costs necessary to respond to such emergencies. The Board
of Directors shall restore any such funds to the designated reserve from which such funds were
drawn as soon as feasible pursuant to the requirements of GC §61112 (GCSD 2010).
1.5 GROWTH
1.5.1 Present and Planned Land Use and Development
Future development will be based on land uses designated by the Tuolumne County General Plan
and the ability of the GCSD to serve the area with water, sewer, fire protection and park and
recreation services to meet the development requirements of the County of Tuolumne.
The District contains a combination of residential, commercial, industrial and recreational land
uses. Tuolumne County’s General Plan governs land use within the District and includes the
following designations: Parks and Recreation (R/P), Public (P), Open Space (O), Low Density
Residential (LDR), Medium Density Residential (MDR), High Density Residential (HDR), Estate
Residential (ER), Homestead Residential (HR), Rural Residential (RR), Large Lot Residential (LR),
Agricultural (AG), Neighborhood Commercial (NC), General Commercial (GC), Mixed-Use (MU),
Business Park (BP), Light Industrial (LI), Heavy Industrial (HI), Special Commercial (SC) and
Heavy Commercial (HC). (Tuolumne County 2018a)
The area encompassed by the District boundary of the GCSD contains property zoned R-1 (Single-
family Residential), R-2 (Medium Density Residential), R-3 (Multiple-family Residential) RE-1
(Residential Estate, One Acre Minimum), RE-2 (Residential Estate, Two Acre Minimum), RE-3
(Residential Estate, Three Acre Minimum), RE-5 (Residential Estate, Five Acre Minimum), , A-10
(General Agricultural, Ten Acre Minimum), A-20 (General Agricultural, Twenty Acre Minimum), AE-
37 (Exclusive Agricultural, Thirty-Seven Acre Minimum), M-U (Mixed Use), C-O (Neighborhood
Commercial), C-1 (General Commercial), C-2 (Heavy Commercial), C-K (Commercial Recreation),
B-P (Business Park), M-1 (Light Industrial), M-2 (Heavy Industrial, K (General Recreation), O
(Open Space) and P (Public). (Tuolumne County 2019b).
1.5.2 Existing Population and Projected Growth
Within the GCSD District boundary there are 4,335 total parcels, of which 807 are undeveloped
(GCSD 2020d). According to Tuolumne County GIS data there are 4,613 total parcels within the
SOI Boundary (Tuolumne County 2019b).
The 2010 US Census indicates that there were 4,924 residents in 2010 in the Groveland/Big Oak
Flat Census County Division (CCD). The communities of Groveland and Big Oak Flat consist of
both year-round and seasonal households. Many properties in the Pine Mountain Lake Subdivision
contain second homes, which are only seasonally occupied (Census 2010).
Population growth is expected to increase at an annual rate of approximately 0.8% for Tuolumne
County (Tuolumne County, 2019). Based on this growth rate, the District can expect a population
increase of approximately 670 people within the next five years.
There are two development projects that are being considered within the District’s Sphere of
Influence: the Airport Estates and the Long Gulch Subdivision project. Construction of the Airport
Estates project would result in 9 residential lots, ranging in size from approximately 2 to 2.9 acres
(see Section 4.1.2 for further detail). The Long Gulch project would result in 19 residential lots,
ranging in size from approximately 3.0± acres to12.5± acres.
Additionally, Yonder Yosemite is a proposed hospitality development on 36 acres located within the
District’s boundaries. The development includes 175 guest suites, employee housing, a lodge,
restaurant, pool, spa and outdoor movie theater. The project proposes connection to the District’s
water and wastewater systems and will receive fire protection and suppression, emergency
response, park and recreation services from the District.
1.6 DISADVANTAGED UNINCORPORATED COMMUNITIES
Pursuant to GC §56430(a)(2), LAFCo is required to include in a MSR a description of the location
and characteristics of any disadvantaged unincorporated communities (DUC) within or contiguous
to the SOI. Government Code §56033.5 defines a DUC as “inhabited territory that constitutes all or
a portion of a disadvantaged community as defined Section 79505.5 of the Water Code.” A
disadvantaged community is defined as a community with a median household income (MHI) of
less than 80 percent of the statewide annual MHI.
Further, GC §56425(e)(2) requires LAFCo to adopt additional determinations for an update of a
SOI of a special district that provides public facilities and services related to sewer, water and fire
protection. The GCSD provides sewer, water, fire protection, park and recreation services to the
DUC of Groveland, including the communities of Big Oak Flat. The GCSD also provides services to
the Pine Mountain Lake Subdivision. These services and facilities are provided in an efficient
manner to all property owners, residents and visitors of the area regardless of income.
The GCSD service area encompasses the unincorporated community of Groveland, including the
Pine Mountain Lake Subdivision, and Big Oak Flat. The communities of Groveland and Big Oak
Flat are located approximately 25 miles southeast of Sonora on State Highway 120. Property
owners within the District boundaries receiving general services such as water, sewer,
park/recreation, community fire protection and emergency services, are considered customers of
the District. The Groveland Fire Department routinely provides fire suppression and rescue
response outside the District boundaries under an Automatic and Mutual Aid Agreement Local
Operating Plan between the Tuolumne County Fire Department, Mariposa County Fire Department
and the GCSD. Mutual Fire Aid is provided to all other fire protection agencies in the County,
including CalFire, and the USFS.
The 2010 Census identifies the Groveland community as a census designated place (CDP) with a
MHI of $31,587 per year. Pine Mountain Lake is also a CDP that has a MHI of $54,200 per year.
The Census further indicates that the MHI for the State of California is $61,632 per year. Eighty
percent of the statewide MHI is $49,306 per year. Since the MHI of the Groveland community is
less than 80 percent of the Statewide median household income, the Groveland community is a
DUC. However, the Pine Mountain Lake Subdivision does not meet the definition of a DUC
(Census 2010).
Senate Bill 1087 requires that water use projection of an Urban Water Management Plan (UWMP)
include projected water use for single-family and multi-family residential housing for lower income
households as identified in the housing element of any city, county or other applicable general
plan. Housing Elements rely on the Regional Housing Needs Assessment (RHNA) generated by
the State Department of Housing and Community Development (HCD) to allocate the regional
need for housing for incorporation into housing element updates. Tuolumne County last updated
Chapter 3, the Housing Element of the Tuolumne County General Plan in September 2019. The
County’s Housing Element identifies a five-year (2019-2024) low-income housing development
goal. The target number for new lower income households is 62 extremely low-income units, 63
very low-income units, and 93 low-income units for a total of 218 lower-income units.
Consistent with GC §65589.7, it is GCSD policy to prioritize proposed developments seeking water
and/or sewer service that include housing units affordable to lower income households. To further
this policy, the GCSD adopted the following procedures:
GCSD will not deny or condition the approval of an application for services to, or reduce the
amount of service by a proposed development that includes housing units affordable to
lower income households unless GCSD makes a specific written finding that the denial,
condition, or reduction is necessary due to the existence of one or more of the following:
1. GCSD does not have “sufficient water supply” as defined in paragraph (2) of
subdivision (a) of Government Code Section 66473.7, or is operating under a water
shortage emergency as defined in Section 350 of the California Water Code, or
does not have sufficient water treatment or distribution capacity to serve the needs
of the proposed development, as demonstrated by a written engineering analysis
and report.
2. GCSD is subject to a compliance order issued by the State Department of Health
Services that prohibits new water connections.
3. The proposed development is seeking sewer service, and GCSD does not have
sufficient collection, treatment, or reclamation capacity, as demonstrated by a
written engineering analysis and report on the condition of the collection, treatment,
or reclamation works, to serve the needs of the proposed development.
4. The proposed development is seeking sewer service, and GCSD is under an order
issued by a Regional Water Quality Control Board (RWQCB) that prohibits new
sewer connections.
5. The applicant failed to agree to reasonable terms and conditions relating to the
provision of service generally applicable to development projects seeking service
from GCSD, including but not limited to the requirements of local, state, or federal
laws, and regulations or payment of a fee or charge.
2 INTRODUCTION
2.1 LOCAL AGENCY FORMATION COMMISSION
Local Agency Formation Commissions (LAFCo) are quasi-legislative, independent local agencies
that were established by State legislation in 1963 to regulate the boundaries of cities and special
districts. There is a LAFCo in each of the 58 counties in California; each LAFCo is an independent
public agency.
Through the implementation of the Cortese-Knox-Hertzberg (CKH) Local Government
Reorganization Act of 2000 (California Government Code (GC) §56000 et. seq.), the objectives of
LAFCo are to encourage the orderly formation of local government agencies and promote the
efficient provision of public services, preserve agricultural and open space lands, and to promote
orderly growth and discourage urban sprawl.
LAFCo has the authority to establish and reorganize cities and special districts, change their
boundaries and authorized services, allow the extension of public services, and a responsibility to
perform municipal service reviews (MSRs), and establish spheres of influence (SOI). Some of
LAFCo duties include regulating boundary changes through annexations or detachments and
forming, consolidating, or dissolving local agencies.
2.2 TUOLUMNE LAFCO
The CKH provides for flexibility in addressing State regulations to allow for adaptation to local
needs. Tuolumne County LAFCo has adopted policies, procedures and principles that guide its
operations. These policies and procedures can be found on Tuolumne LAFCo’s website at the
following location: https://www.tuolumnecounty.ca.gov/143/Local-Agency-Formation-Commission.
The Tuolumne County LAFCo adopted policies related to Municipal (urban) Services on November
26, 2001.
Tuolumne LAFCo has a public Commission with seven regular Commissioners and four alternate
Commissioners. The Commission is composed of two members of the Tuolumne County Board of
Supervisors, two City Council members, two Special District representatives, and one Public
Member-At Large. The Commission also includes one alternate member for each represented
category.
2.3 MUNICIPAL SERVICE REVIEW
The CKH (GC §56430) is the statutory authority for the preparation of an MSR and periodic
updates of the SOI of each local agency. MSRs are required prior to and in conjunction with the
update of a SOI.
An MSR is a comprehensive analysis of the services provided by a local government agency to
evaluate the capabilities of that agency to meet the public service needs of their current and future
service area. An MSR must address the following seven factors:
1. Growth and population projections for the affected area.
2. The location and characteristics of any disadvantaged unincorporated communities within
or contiguous to the sphere of influence.
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies including needs or deficiencies related to sewers,
municipal and industrial water, and structural fire protection in any disadvantaged
unincorporated communities within or contiguous to the sphere of influence.
4. Financial ability of agencies to provide services.
5. Status of, and opportunities for, shared facilities.
6. Accountability for community service needs, including governmental structure and
operational efficiencies.
7. Any other matter related to effective or efficient service delivery, as required by commission
policy.
MSRs include written statements or determinations with respect to each of the seven mandated
areas of evaluation enumerated above. These determinations provide the basis for LAFCo to
consider the appropriateness of a service provider’s existing and future service area boundary.
2.4 SPHERE OF INFLUENCE
The CKH Act requires LAFCo to adopt a SOI for all local agencies within its jurisdiction and review
the SOIs every five years (GC 56425(g)). A SOI is “a plan for the probable physical boundary and
service area of a local agency or municipality as determined by the Commission” (GC §56076).
The SOI is only one of several factors LAFCo must consider in reviewing individual proposals, such
as an application for an annexation to a district or city. (California Government Code Section
56668). However, inclusion of a particular area within an agency’s SOI does not necessarily mean
that the area will eventually be annexed.
In determining the SOI for each local agency, LAFCo must consider and prepare a written
statement of determinations with respect to each of the following (GC 56425(e)):
1. The present and planned land uses in the area, including agricultural and open space
lands.
2. The present and probable need for public facilities and services in the area.
3. The present capacity of public facilities and adequacy of public services that the agency
provides or is authorized to provide.
4. The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
5. For an update of a sphere of influence of a city or special district that provides public
facilities or services related to sewers, municipal and industrial water, or structural fire
protection, that occurs pursuant to subdivision (g) on or after July 1, 2012, the present
and probable need for those public facilities and services of any disadvantaged
unincorporated communities within the existing sphere of influence.
These determinations provide the basis for LAFCo to consider the appropriateness of establishing
or modifying a service provider’s SOI or probable future boundary.
2.5 DESCRIPTION OF PUBLIC PARTICIPATION PROCESS
As a public agency, LAFCo proceedings are subject to the provisions of California’s open meeting
law, the Ralph M. Brown Act (Government Code Sections 54950 et seq.) The Brown Act requires
advance posting of meeting agendas and contains various other provisions designed to ensure that
the public has adequate access to information regarding the proceedings of public boards and
commissions. Tuolumne County LAFCo complies with the requirements of the Brown Act.
Each MSR is prepared as a draft and will be subject to public and agency comment prior to final
consideration by the Commission. The contents of this review are based primarily upon the
information provided in the “Request For information for Municipal Service Reviews” completed for
the Groveland Community Services District (GCSD) by Peter Kampa, General Manager, and staff
of the GCSD.
2.6 CALIFORNIA ENVIRONMENTAL QUALITY ACT
Municipal service reviews are planning studies that are statutorily exempt from environmental
review pursuant to GC §15262 of the State CEQA Guidelines. The MSR will be considered by
LAFCo in connection with subsequent proceedings regarding the GCSD SOI. An SOI review or
update is a project and as such is subject to CEQA consideration.
2.7 SENATE BILL 215
Senate Bill 215 (Wiggins) requires LAFCo to consider regional transportation plans and
sustainable community strategies developed pursuant to SB 375 before making boundary
decisions. Senate Bill 375 (Sustainable Communities and Climate Protection Act) requires each
metropolitan planning organization (MPO) to address regional greenhouse gas (GHG) emission
reduction targets for passenger vehicles in their Regional Transportation Plan (RTP) by integrating
planning for transportation, land-use, and housing in a sustainable communities strategy.
Tuolumne County is not located within an MPO boundary and therefore is not subject to the
provisions of SB 375. However, the Tuolumne County Transportation Council (TCTC) is
responsible for developing transportation improvements that reflect the needs, concerns and
actions of all the agencies (including Tribal Governments) involved in the Tuolumne County region,
while contributing to the region's mobility needs, economic health, and environmental quality.
TCTC is also responsible for allocating regional transportation funding to transportation
improvement projects consistent with the 2016 RTP for Tuolumne County.
Tuolumne County and the City of Sonora are the local agencies primarily responsible for planning
regional growth patterns through adoption and implementation of general plan and zoning
regulations. While Tuolumne County is not subject to the provisions of SB 375, LAFCo will review
applicable regional transportation and growth plans when considering a change of organization or
reorganization application.
3 MUNICIPAL SERVICE REVIEW
3.1 SERVICE OVERVIEW
The CKH identifies seven factors, listed in Section 1.3, to be addressed when preparing a MSR.
For each factor, information is gathered and analyzed, with written determinations prepared for
LAFCo’s consideration. This MSR will be used as an information base to update the GCSD’s SOI,
including any annexation considerations, and provides a basis for the public, County and LAFCo to
discuss changes to the SOI.
3.1.1 Services
The GCSD water system distributes the water to the populated areas of Big Oak Flat, Groveland,
and Pine Mountain Lake. The GCSD water supply and distribution system includes 3 water
treatment plants, 5 storage reservoirs, and approximately 70 miles of distribution piping. The
District provides a treated water supply to approximately 3,500 customers. The District also owns
and operates the regional wastewater collection, treatment, and regional recycled water system,
which provides sewer service to approximately 1,500 customers within the District's service area.
The areas of Groveland and Big Oak Flat encompassed by the GCSD include 3,230 water service
connections, 1,590 sewer service connections and approximately 4,500 parcels who receive Fire
Protection/Emergency Services and Parks/Recreation Services provided by GCSD, the majority of
which are single-family residences (GCSD 2016a; GCSD 2019b; GCSD 2020a).
Additionally, Pursuant to the Tuolumne County Automatic and Mutual Aid Agreements, the Fire
Department of the GCSD provides automatic and mutual aid response to fire and medical
emergencies between Moccasin and Yosemite National Park along Highway 120 (Table 3-1). The
Fire Department is the only staffed response agency in that unincorporated area of the County
except for the CalFire Groveland Station when staffed and available (GCSD 2020a).
Table 3-1: GCSD services provided to the Groveland and Big Oak Flat
Communities
Service Connections Population (full time) Parcels
Water 3,230 3,257
Wastewater 1,590
Fire/EMS 4,500
Parks/Recreation 4,500
Source: GCSD 2016a; GCSD 2019b; GCSD 2020a.
3.1.2 Service Areas
The GCSD provides potable water delivery, wastewater collection, parks and fire protection
services to a 14.9 square-mile service area that includes the communities of Groveland, Big Oak
Flat and Pine Mountain Lake with a population of approximately 4,500 residents. In addition to this
resident population, the Tuolumne County Visitor’s Bureau estimates upwards of 400,000 vehicles
access Yosemite National Park annually by way of Highway 120 through Groveland (GCSD
2020a).
3.2 WATER
3.2.1 Service Overview
The GCSD operates 3 water treatment plants, 5 storage reservoirs, and approximately 70 miles of
distribution piping. The GCSD provides potable water service to 3,230 service connections (See
Figure 3). The Agreement with the San Francisco Public Utilities Commission (SFPUC) allows for
the District to purchase a sufficient quantity of water to supply the total water needs of the District
service area. The GCSD currently provides water service to 3,257 full-time residents (GCSD
2016a).
Capital Improvement Projects
As of the date of this review, the District has the following projects documented as recently
completed, in construction, preparing for public bid or waiting for funding prior to bidding:
General Projects (Provide benefits to all services):
• Administrative Office Building Upgrades – completed 2020
• Administrative Office Asphalt Rehabilitation – Phase I completed in 2021
Water Projects
• Big Creek/Second Garotte Clearwell Rehabilitation - in construction
• Tank 4 Emergency Generator – Completed 2021
• Butler Way Bypass Pump – in construction
• Alternative Water Supply (AWS) Improvements – in planning and design
• Downtown Groveland/Big Oak Flat Water Distribution System Replacement, design and
permitting complete, awaiting $3.4 million grant/loan funding contract
Sewer Projects
• Wastewater Treatment Plant Headworks Replacement – Bidding November 2021
• Sludge Drying Bed Improvements – Construction October 2021
• Rattlesnake Creek Crossing Replacement – completed 2020, $45,000 grant funded
• Groveland/Big Oak Flat Sewer Collection System Rehabilitation – $5.8 Million, 75% grant
funded, Public Bidding in March 2021
• Generator Replacements for PSPS preparation –Emergency power generators being
replaced in 9 pumping and treatment plant locations, funding with $600,000 in state grant
funding. Generators have been ordered and final installation expected by March 2022
• Lift Station 5 Sewer Line Repair – in design
• Wastewater Treatment Plant Road Restoration – Construction October 2021
• Wastewater Treatment Plant Valve Vault Replacement – completed 2019
• Lift Station 2 Improvements – bidding planned for March 2021
Fire Projects
• Jones Hill Fire Fuel Break – Phase 1 completed 2021, $165,000 grant funded, Additional
grants awarded in September 2021 for additional phases of the fuel break and on all district
properties
• Fire Station Driveway Restoration – completed 2019
• Fire Station Siding Replacement and Paint – completed 2020
Park Projects (all projects in Master Planning process)
• 2021 Capital Improvements –Currently planning and designing an adventure park and
amphitheater development, a system of trails, Irrigation system replacement, restroom
plumbing replacements, parking lot resurfacing and striping, replacement of concrete slab
under skate park, table and barbeque replacements
• Bike Pump Track, Disc Golf Course, RV Park Development, Mountain Bike Course
• Hetch Hetchy Railroad Trail Development
3.2.2 Water Demand and Capacity
Water Sources
The GCSD has three sources of water: 1) Surface water from the SFPUC Hetch Hetchy Mountain
Tunnel at two locations (Second Garrote Shaft and Big Creek Shaft); 2) Surface water that flows
into Pine Mountain Lake (water rights owned by the Turlock Irrigation District); and 3) Surface
water stored in Cherry Lake owned by the SFPUC and diverted into the Mountain Tunnel in
emergency and maintenance conditions. The majority of the District’s water is sourced from the
Hetch Hetchy Mountain Tunnel (GCSD 2020b).
The surface water supplied to the GCSD from the Hetch Hetchy Mountain Tunnel is provided
through a 1967 Agreement with the SFPUC, which was extended in 1984 and will not expire until
March of 2034. Under the terms of the Agreement, the GCSD is a retail customer of the City and
County of San Francisco. The source of supply for the Hetch Hetchy Reservoir is the Tuolumne
River. Big Creek Shaft and Second Garrote tap the underlying Hetch Hetchy Mountain Tunnel as
the primary source of water for the GCSD area. This water is considered “pristine” since it
originates from high in the Sierra Nevada Mountain Range and is protected in tunnels until it gets to
the GCSD. Although the US Environmental Protection Agency (EPA) and the Department of Public
Health (DPH) have approved the use of this water without filtering, water from both facilities is
treated prior to distribution to its customers. The GCSD treats the water with ultraviolet (UV) light
disinfection and chloramines before it is transmitted through the water distribution systems. The Big
Creek Water Treatment Facility primarily serves Pine Mountain Lake, while the Second Garrote
Water Treatment Facility serves Groveland and Big Oak Flat. The District has an interconnection
tying the two distribution systems together between Water Storage Tanks 1 and 3 (Tuolumne
County LAFCo 2013). The interconnection is served by the Butler Way Booster Pump system,
which was rebuilt and improved using state grant funds in 2021.
From the treatment plants, the treated water travels to the GCSD’s distribution system through the
underground piping mainly contained in road rights-of-way The GCSD serves its customers
through a network of primarily asbestos cement pipe and polyvinyl chloride pipe ranging in
diameter from 2 to 10 inches. The water distribution system is approximately 71 miles long and
contains 11 different pressure zones. Figure 3 displays a map of the GCSD water system.
Approximately 80% of the existing connections have pressure reducing valves as required by the
Uniform Plumbing Code and to protect customer plumbing, and all system services are metered
(GCSD 2020b). The District has 3,257 active water connections and serves a population that
varies between approximately 4,500 in the winter months to about 9,000 on busy holiday
weekends in the summer. (GCSD 2020b)
Water Storage
The overall SFPUC system provides 265 million gallons per day (mgd) of water, of which the
GCSD has a share of 0.4 mgd. The GCSD’s two water treatment facilities have a combined water
storage capacity of 4 million gallons. The GCSD also has five (5) storage reservoirs with a total
capacity of approximately 2.5 million gallons. The tank number and storage capacity are shown in
Table 3-2. A deficiency in water storage volumes for firefighting purposes is identified in Tank #5,
and the construction of additional storage serving the Groveland and Big Oak Flat pressure zone is
recommended and being planned by the District.
The District’s total storage volume, including the storage at the water treatment plants is 6.64
million gallons of water storage, which is much more than current daily customer demands
(discussed below). The GCSD has completed a Water Supply Critical Dry Period Analysis that
shows even in dry and critical dry years the District has sufficient water storage to meet its
customers’ daily demands through year 2034 (Tuolumne County LAFCo 2013).
Table 3-2: GCSD Storage Tanks
Tank
Tank
Water Source Area Served Volume
Number
(gallons)
Second Garrotte Treatment Groveland, Big Oak and
1 500,000
Facility Yosemite Highland Subdivision
2 Big Creek Treatment Facility Pine Mountain Lake Subdivision 750,000
3 Big Creek Treatment Facility Pine Mountain Lake Subdivision 750,000
4 Big Creek Treatment Facility Pine Mountain Lake Subdivision 500,000
5 Groveland Pressure Zone Yosemite Highlands Subdivision 140,000
Total Tank Capacity 2,640,000
Source: GCSD 2020b.
Water Demand
According to the California Code of Regulations (CCR), Title 22, Section 64554, when monthly
water usage data is available, the maximum monthly water usage for the past 10 years should be
implemented to project the community’s future water demands. Based on the observed water
consumption from 2016 to 2019, the GCSD maximum monthly water consumption in August of
2017. Table 3-3 displays the observed water consumption for the GCSD from 2016 to 2019 (GCSD
2020b).
Table 3-3: GCSD Historical Water Consumption
2016 2017 2018 2019
Month Million Million Million Million
Gallons Gallons Gallons Gallons
January 7.2 8.48 6.69 6.55
February 6.85 1.64 7.2 5.75
March 6.61 1.55 6.51 7.18
April 8.43 8.22 7.39 8.13
May 10.71 6.3 9.64 10.53
June 13.51 12.39 12.56 11.48
July 16.85 13.19 15.31 14.73
August 16.2 20.05 13.82 15.31
September 12.52 15.52 12.04 11.45
October 9.98 12.31 10.15 9.71
November 8.11 11.08 8.56 8.64
December 8.48 7.73 8.06 8.12
Total Usage 125.45 118.47 117.93 117.59
Maximum Usage 16.85 20.05 15.31 15.31
Maximum Month July August July August
Source: GCSD 2020b.
Table 3-4 provides a summary of the District’s potable water demand projections, as well as the
Average Day Demand (ADD), Maximum Day Demand (MDD) and Peak Hour Demand (PHD) for
the GCSD’s water system through 2040. The ADD’s were calculated from the maximum month
demands reported for the region during the specified year and projected through the year 2040.
The MDDs were calculated using the ADD and a factor of 1.5, as specified in the CCR Title 22,
Section 64554. The PHD was calculated by applying a factor of 1.5 to the MDD as specified by
CCR Title 22, Section 64554 (GCSD 2020b).
Table 3-4: Projected Water Demands (Million Gallons)
2017 2020 2025 2030 2035 2040
Projected ADD 0.65 0.66 0.68 0.69 0.71 0.73
Projected MDD 0.97 0.99 1.01 1.04 1.07 1.1
Projected PHD 1.46 1.48 1.52 1.56 1.6 1.65
Source: GCSD 2020b.
Water Treatment Plants
GCSD has three (3) Water Treatment Plants (WTP’s). GCSD has relied on filtration avoidance to
achieve compliance with the Surface Water Treatment Regulations (SWTR) using the disinfection
process only. However, since the adoption of the Federal Disinfection Byproducts Rule (DBPR) on
January 1, 2004, GCSD modified the disinfection process to achieve compliance with the DBPR
and maintain filtration avoidance. Only two (2) of the three (3) treatment facilities are reliant on
filtration avoidance: the Big Creek and Second Garrotte treatment facilities.
The GCSD has an alternative water treatment facility that is utilized when the Hetch Hetchy
Mountain tunnel is undergoing maintenance or during emergency situations. This treatment facility
is recognized as the Alternative Water System (AWS) WTP (GCSD 2020b). The water treatment
capacity for each of the WTP’s is listed in Table 3-5.
Table 3-5: Water Treatment Plant Capacity
Gallons Per Gallons Per Day
Facility Name Minute (GPM) (GPD)
Capacity Capacity
Big Creek Treatment Facility 1650 2,376,000
Second Garrotte Treatment Facility 620 892,800
Groveland AWS Treatment Facility 600 864,000
Source: GCSD 2020b.
Water for Fire Flows
Fire services in communities are classified by the Insurance Service Office (ISO), which is an
advisory organization depended on by insurance companies for establishing the availability and
costs for fire insurance. The ISO rating classifies fire service in communities with a ranking from 1
to 10, indicating the general adequacy of coverage. Communities with the best fire protection
facilities, systems for water distribution, fire alarms, communications, equipment, and personnel
receive a rating of 1. Primary factors assessed in establishing ISO ratings are maintaining more
than one fire station within a district boundary to meet the 5-mile radius requirements, ensuring
appropriate facility maintenance and upgrades are made, and sufficient personnel and volunteers
exist to respond to each station.
The Tuolumne County Fire Department recently received an updated Public Protection
Classification rating by ISO of 04/04x, which includes the services of and rating for the Groveland
CSD Fire Department. The current ISO ratings are based on fire prevention activities and water
storage and pumping capacity.
The GCSD has approximately 535 fire hydrants strategically placed throughout the service area.
GCSD’s Standards specify a minimum fire flow requirement of 500 gpm for commercial and
residential areas. In 2001, Tuolumne County preformed a hydrant test within GCSD. The findings
indicated that a majority of GCSD’s fire hydrants are capable of exceeding the 500 gpm fire flow
standard (GCSD 2020b). Figure 5 shows the location of the GCSD hydrants and Fire Stations.
Fire flow is dependent of volume, pressure and flow duration. GCSD is capable of providing
adequate volume of water, therefore satisfying two of the three requirements (volume, flow
duration). In all regions where fire flow requirements were not met, the reasons were directly
related to low pressure. Table 3-6 shows the areas that did not meet the fire flow requirements.
Table 3-6: Low Pressure Zones
Zone Zone Location Pressure1
GL-C HWY 120 < 0.0 psi
GL-C Fire
GL-C Millen Trailer Park 3.62 psi
BOF Fire BOF Big Oak Flat - Majority of Community < 0.0 psi
PML-W Muller Dr. near PRV-PML-06 < 0.0 psi
PML-W Fire PML-W Jackson Mill Rd. < 0.0 psi
PML-W Ferretti Rd. < 0.0 psi
GL-SE Hillhurst Circle below Tank No. 3 < 0.0 psi
GL-SE Fire
GL-SE Elder Lane < 0.0 psi
PML-C Fire PML-C Lower Skyridge Drive < 0.0 psi
Notes:
1 A pressure of < 0.0 psi indicates that the fire demand would not be achieved.
Source: GCSD 2020b.
The GL-C zone’s low pressure was cause by a looped system comprised of 4-inch pipelines. The
low pressure zone at the Millen Trailer park may be resolved by increasing the hydraulic gradient
line for the system.
The Big Oak Flat (BOF) zone’s low pressure was triggered by system deficiencies. The BOF zone
is provided potable water entirely through a single 6-inch dead-end pipeline. A 6-inch dead-end
pipeline is not sufficient to provide fire flow conditions.
The PML-W zone is connected to the PML-SW zone. PRV-PML-06, separates the two zones. In
normal operation, PRV-PML-06 is closed. By closing this valve, it creates low pressure within PML-
W.
Similar to the BOF zone, the GL-SE zone’s low pressure is introduced by system deficiencies. The
GL-SE zone’s deficiency is that it is supplied potable water through a single dead-end 6-inch
pipeline that is connected directly to Tank No. 3.
The PML-C zone’s low pressure was caused by an un-looped dead-end pipeline within Skyridge
Drive.
The District has completed the design of a new water distribution system within Groveland and
BOF to address the fire flow conditions and is waiting for CDBG funding through Tuolumne County
or DWSRF funding to construction the new distribution system improvements. Funding is expected
to become available in 2021 (GCSD 2020b), and completion of this project will increase system fire
flow capabilities to acceptable levels. In addition, the District is seeking funding for relocation of
Tank 4 to a higher elevation to increase fireflow and also relocation/expansion of Tank 3 to provide
adequate water storage for fire flow.
.
3.2.3 Operations and Capital Needs
GCSD is located on the uppermost portion of the transmission system and has a contract with the
SFPUC for raw water supply until 2034. GCSD and SFPUC estimate that sufficient quantities of
water will be available from the Hetch Hetchy system to meet projected demands over the next 14
years (GCSD 2016a). Despite being under contract with SFPUC until 2034, repairs to the Hetch
Hetchy Mountain Tunnel are needed. During the period of 2007 to 2017 the tunnel was shut down
once a year for approximately 60 days. Throughout those 10 years, the raw water supply was
interrupted, which required the GCSD to find a new alternative way to supply the community. As
stated above, the District was given rights to draw water from Pine Mountain Lake (PML), which is
treated at the AWS WTP. The life span of the repairs made between 2007 and 2017 is unknown,
and it is currently planned by the SFPUC for the tunnel to be shut down again for
repairs/maintenance in the future. To prepare for these shutdowns or any other catastrophic
problem that could cause the shutdown of the tunnel, the GCSD recommends transitioning the
temporary AWS WTP to a permanent facility (GCSD 2020b).
3.2.4 Water Infrastructure Needs and Deficiencies
The GCSD water system is in reasonably good condition, aside from the deficiencies in fire storage
and fire flow conditions discussed above. The 2020 GCSD Agency Facilities and Infrastructure
report stated that the GCSD water system does not have any active violations and has not received
any violations since 2007. Potable water being provided to their customers meets the requirements
set forth under the California Waterworks Standards and the SWRCB-DDW (GCSD 2020b).
Indicators of distribution system integrity are the number of breaks and leaks in the system and the
rate of unaccounted for water loss. GCSD has drastically reduced the amount of water loss through
the distribution system in recent years. This reduction is due mainly to metering the quantity of
water being used for fire suppression or line flushing and replacement of outdated customer/source
water meters. In addition to the fireflow improvement project addressed above, the 2020 report
identified two additional water infrastructure needs for the district: water meters and AWS WTP
improvements (GCSD 2020b).
Water Meter Improvements
The GCSD utilizes manual water meters to monitor and measure the amount of water used within
each active connection. The District’s operators must visit each individual meter and manually
record each water meter reading to obtain water usage information. This is an outdated, inaccurate
and inefficient way to monitor water usage. District residents pay a fixed plus variable rate for water
services. The variable rate charged plays a small role in the resident’s total monthly water bill. Rate
increases implemented beginning in 2016 and extending through 2020 increased the variably
component of the water rate significantly, encouraging water conservation within the District.
California legislature has recognized the importance of water metering and has passed several
bills requiring meters throughout the State. In 2004, AB 2572 closed the loophole in the SB 229 by
requiring urban water utilities to meter all municipal and industrial users by 2025 and charge
metered customers based on the actual volume of water delivered.
Metering water usage and billing residents based on volumetric rates is the best way to promote
water conservation and reduce lost or unmetered water. The District is actively seeking funding to
transition their current metering system to Automatic Metering Infrastructure (AMI), a more
technologically and time efficient, system before the 2025 deadline. This 2025 deadline does not
apply to the transition to AMI.
To fund the construction of these improvements, the GCSD has applied for a United States
Department of Agriculture (USDA) grant/loan funding to pay for the installation of a water meter
improvements and permanent AWS system installation.
AWS WTP Improvements
The AWS WTP is a revolutionary facility that was designed with simplicity in mind. The District’s
main objective was designing a temporary facility that runs simply and can be
constructed/deconstructed effortlessly and construct a treatment facility capable of treating raw
water from the Pine Mountain Lake to drinking water standards. However, while the AWS WTP is
capable of treating raw water from Pine Mountain Lake to drinking water standards, it is neither
simple to run nor easily constructed/deconstructed. Many aspects of the treatment must be
manually monitored and altered to ensure proper treatment is achieved and overflow does not
occur (GCSD 2020b).
The AWS WTP was designed to be a temporary pop-up water treatment facility. The intent was
that the plant would be constructed before the first day of maintenance each year and
deconstructed after the annual 60-day maintenance shutdown period of the Hetch Hetchy
Mountain Tunnel had lapsed. This way, the AWS WTP would not interfere with the Pine Mountain
Lake Homeowner’s Association (PMLA) or County Sheriff Department. Due to the complexity of the
treatment facility, required tools to deconstruct and transport the treatment units and the need for
the membrane filters to be submerged underwater, GCSD has decided to leave the AWS WTP
system up year-round. For this reason, PMLA charges the District an annual fee to house the AWS
WTP.
The GCSD must be capable of providing their customers potable water under the worst-case
scenario. Due to the aging infrastructure of the Hetch Hetchy Mountain tunnel, the GCSD require a
permanent alternative water supply method. For this reason, the GCSD has applied for a USDA
grant/loan funding to fund the construction of a permanent AWS WTP (GCSD 2020b).
3.3 WASTEWATER
3.3.1 Service Overview
The GCSD wastewater infrastructure consists of a sewer collection system, a wastewater
treatment plant (WWTP) and reuse/disposal fields. The District’s WWTP receives wastewater
generated by residential and commercial customers throughout the Groveland, Big Oak Flat and
Pine Mountain Lake communities. The District provides sewer service to approximately 1,590
connections including residents and businesses.
The GCSD operates a wastewater collection, treatment, and storage system and a potable water
treatment, storage, and distribution system. These facilities are managed by the Operations
Department Manager. All employees in this department are certified by the State of California in the
areas of water treatment, wastewater treatment, sewage collection, and/or water distribution
(GCSD 2019b).
3.3.2 Wastewater Collection, Treatment and Disposal
The District owns and operates one WWTP with a nominal capacity of 250,000 gallons per day
(gpd). The treatment plant consists of primary and secondary treatment. On-site facilities consist of
a mechanical shop, laboratory and offices.
GCSD’s sewer collection system consists of 16 lift stations, 7 miles of force main, 35 miles of
gravity lines, which serve the District’s 1,590 connections. All of the lift stations are located in Pine
Mountain Lake, except Lift Station 16, which serves Big Oak Flat. The physical state of some of
these sewer lines is in poor condition and requires rehabilitation (discussed in detail below) (GCSD
2020b). Capital Improvement Projects are prioritized based on criticality to system operation and
impact on system maintenance requirements and Sanitary Sewer Overflows, cost savings, safety
and regulatory requirements. Portions of the sewer collection system are internally evaluated
annually using CCTV. Failed or failing items that affect regulatory compliance including system
overflows are replaced and upgraded as the highest priority. Projects that improve operations and
operator/public safety are typically second priority, and improvements for cost savings only are
third priority. The District has a draft Capital Improvement Plan that is being evaluated and
integrated into the 2021 Water/Wastewater Master Plan Update expected to be completed by
November 2021.
There are two reclaimed water storage reservoirs. Reservoir 1 has a storage volume of
approximately 14 acre-feet (AF). Reservoir 2 has a volume of approximately 170 AF. Pine
Mountain Lake Golf Course operates a small reservoir that blends a portion of the District’s effluent
with lake water for irrigation of the 110-acre golf course and landscaping. The golf course uses 135
AF annually on average. The remainder of the District’s reclaimed water is disposed of on the 14
acres of spray fields on District property (Tuolumne County LAFCo 2013).
Collection
A planning study grant was received in 2015 and a comprehensive engineering report evaluating
the condition of the sewer collection network was completed. To fund the construction of the
required repairs to the GCSD sewer collection network, the District has applied for and received
SWRCB Clean Water State Revolving Fund (CWSRF) construction grant and loan funding (GCSD
2020b) in the amount of $4,384,176 (Grant) and $1,461,392 (Loan). The project has been bid and
a construction contract awarded in July 2021. Construction is estimated to take approximately 365
working days to complete.
The study revealed that the overall condition of the sewer collection system within Groveland and
Big Oak Flats is rated as fair to good in accordance with pipeline standards described below. There
are several areas of the collection system, including the pipelines rated as Fair to Immediate Action
Required that are causing significant maintenance problems, including many collection manholes
not included in the pipeline ratings, that require renovation and replacement. Currently, repairs are
prioritized in response to emergency calls from the District’s residents. Response consists of
GCSD staff addressing problems with the collection system that typically consist of location and
repair of back-ups and overflows/spills within the system. Additionally, some manholes become
submerged under water during high precipitation events. In some cases, the structural condition of
manholes is extremely poor, with cracks and erosion present in the concrete. Further, some areas
within Pine Mountain Lake require frequent flushing due to sags in the sewer pipe.
In Spring of 2016 as a component of the planning study, the District conducted a comprehensive
Closed-Circuit Television (CCTV) inspection of the sewer collection system within the Groveland
and Big Oak Flat communities, assessing approximately 35,000 feet of sanitary sewer.
The condition of the sewer mains was rated using the National Association of Sewer Service
Companies (NASSCO) Pipeline Assessment Condition Program (PACP) standardized ratings.
NASSCO PACP provides a standardized system for the consistent assessment of sanitary sewer
conditions. PACP provides the capability to benchmark sewer conditions in order to track
deterioration over time.
The PACP process identifies the major deterioration factors and assigns a rating that is related to
the likelihood of failure or collapse. Deterioration factors include surrounding soil condition, position
of groundwater table, frequency of sewer surcharging, above ground traffic loading, methods and
materials used in construction, third party damages and defects such as roots, grease and debris
that result in the need for more frequent cleaning. It is important to note that while the condition of
the sewer involves many deterioration factors, both internal and external, a CCTV inspection can
only determine the internal defects that affect the sewer condition (GCSD 2020b).
PACP defects are assigned a grade of 1 to 5 in order of increasing severity. Table 3-7 shows the
criteria of NASSCP PACP ratings.
Table 3-7: NASSCO Ratings
Rating Importance Likelihood of Failure
5- Immediate Defects require immediate Pipe has failed or will likely fail within the
Attention action next 5 years
4- Poor Severe defects Pipe will probably fail in 5 to 10 years
Moderate defects that will
3- Fair Pipe may fail in 10 to 20 years
continue to deteriorate
Defects that have not
2- Good Pipe unlikely to fail for at least 20 years
begun to deteriorate
1- Excellent Minor defects Failure unlikely in the foreseeable future
Source: GCSD 2020b.
Due to the topography of the area, the sewer collection system was designed with numerous
changes in pipe alignment. Structural pipe ratings are only based on the structural integrity of the
pipes and do not factor in operation and maintenance issues such as changes in pipe alignment.
Table 3-8 presents a summary of the ratings observed in the 35,037 feet of CCTV video evaluated.
Table 3-8: Summary of Structural PACP Defects
Rating Size (inches) Total Length (ft)
5 6'' 170
4 none 0
3 6'' 340
2 6'' 721
1 6'' and 8'' 34,172
Source: GCSD 2020b.
The CCTV inspection has revealed the condition of approximately 170 feet of line that require
immediate attention and another 340 feet that are rated fair. Defects found in the lines include a
crushed pipe, delamination, infiltration runners, sags, medium to large joint displacements,
deposits and root intrusion.
3.3.3 Operations and Capital Needs
There are plans for several other repairs, rehabilitations, replacements, and capital improvements
at the District’s treatment facility. The GCSD has received a loan to fund the construction of various
improvements throughout the District’s WWTP. The various upgrades include improvements to the
headworks, irrigation pump station, scum pump station, polymer activation system, screw press
and effluent pump station. By completing these improvements, it will increase the plant’s efficiency,
overall sustainability, and introduce redundancy within the facility (GCSD 2020b). Project design
will be completed by September 2021 and construction expected to begin in November or
December 2021.
The District received a $400,000 planning grant from the State Water Board to evaluate the
condition of the sewer collection system, which has resulted in the Downtown Groveland/Big Oak
Flat Sewer Collection System Renovation project and has received a state water board
construction funding agreement in the amount of $5.8 million of which $4.8 million is grant.
Construction of this project is scheduled to begin in June 2022.
3.3.4 Regulatory Environment
All wastewater treatment providers are required to comply with effluent quality standards under the
waste discharge requirements determined by the RWQCB. There have been no formal Notices of
Violation (NOV) from regulatory agencies concerning the District’s collection system. The major
concerns associated with the GCSD sewer are age and operating condition of the District’s
collection system. The District has adopted a Sewer System Management Plan (SSMP), evaluates
performance annually and updates the SSMP every five years as required.
The GCSD operates under a permit issued by the California Regional Water Quality Control Board,
Central Valley Region (CRWQCB). The permit regulates waste discharge requirements for the
wastewater collection, treatment and reclamation system as well as the National Pollutant
Discharge Elimination System (NPDES) permit. The CRWQCB adopted Cleanup and Abatement
Order No. 5-01-713 in 2001 as a result of sanitary sewer overflows and other Waste Discharge
Permit violations. As a result, the District secured the 2007 Sewer Installment Sale Agreement—La
Salle Bank National Association and upgraded fifteen sewer lift (pump) stations surrounding Pine
Mountain Lake and completed wastewater treatment plant improvements. In 2011, the District was
issued a Notice of Violation (NOV) from the California Regional Water Quality Control Board
(CRWQCB) alleging various violations of water quality and reporting laws as a result of two sewer
spills occurring in 2010 and 2011, and a second NOV on April 9, 2012 for unapproved sludge
disposal practices at the wastewater treatment plant.
In response to the two NOV, in May of 2013, the CRWQCB issued the District a Settlement
Agreement and Stipulation for Entry of Administrative Civil Liability Order R5-2013-0542. The
District complied fully with this order by development of a Sewer System Management Plan
(SSMP) in 2012, increasing sewer system inspections and maintenance, making payments to the
State Water Board, and completing improvements at the wastewater treatment plant.
The District has received no additional notices or violations from the state since 2013 and
completed an update of its Sewer System Management Plan in 2018. The District received a
planning grant from the State Water Board to evaluate the condition of the sewer collection system,
which has resulted in the Downtown Groveland/Big Oak Flat Sewer Collection System Renovation
project and which has received a state water board funding agreement in the amount of $5.8
million of which $4.8 million is grant. Construction will begin in June 2022 and be completed by
December 31, 2023. This project is expected to likely eliminate SSO caused by poor system
condition.
3.4 FIRE PROTECTION AND EMERGENCY SERVICES
3.4.1 Service Overview
The GCSD is authorized to provide fire protection services, rescue services, hazardous material
emergency response services, emergency medical services and ambulance services. The Fire
Master Plan prepared by Citygate in 2020 found that the GCSD Fire Department is well organized
to accomplish its mission to serve a rural population across a varied land-use pattern with a
minimal career staff and no volunteer firefighters. The GCSD provides mutual aid to the Tuolumne
County Fire Department, CAL FIRE and the USFS under its CAL FIRE Schedule A contract. The
department receives good value and benefit from its CAL FIRE Schedule A contract, including
mutual aid as needed from the CAL FIRE Groveland Station when staffed during the summer fire
season and under the Amador Plan Agreement (GCSD 2020a).
The District owns, maintains, and is responsible for the operations of the GCSD Fire Department.
The District funds the entire fire department operation including equipment and fire station, and
contracts with CAL FIRE for personnel to staff the station through the Schedule A Contract. The
Groveland Fire Station is staffed on a full-time basis. The Schedule A contract provides for five (5)
fire fighters total that rotate; one (1) captain and four (4) engineers. Two (2) bodies man the station
24/7. When the state declares the official end to a fire season, funding is halted for the CAL FIRE
Schedule B station located on Merrell Rd. Prior to the 2020/21 fiscal year, the District then funded
the staffing of two (2) fire fighters at this station through its Amador Plan contract. The financial
obligation for the cost of the Amador Plan contract was assumed by the County of Tuolumne
effective July 1, 2020.This assists the District in meeting the two in two out requirements to enter a
structure fire to initiate fire suppression measures and to achieve the Response Time and Effective
Response Force standards adopted by the District in 2020 (GCSD 2020d).
The GCSD Fire Department, currently provides fire protection services and emergency response to
a population of approximately 4,500 in the winter months to about 9,000 on busy holiday weekends
in the summer. The GCSD provides Mutual Aid to the Tuolumne County Fire Department, CAL
FIRE and the USFS. There are two fire stations within the District. The GCSD Station # 78 houses
two Type-1 engines and one Type-3 engine, while the CAL FIRE Groveland Station houses two
Type-3 engines (GCSD 2020a).
GCSD completed a Fire Department Master Plan in 2020 that contains various recommendations
that are identified in Section 3.6.1.3 below (GCSD 2020a).
3.4.2 Facilities and Assets
The Department provides services from one District fire station with a daily response force of two
personnel as summarized in Table 3-9. The County also has an Amador Plan contract with CAL
FIRE that maintains a two-person CAL FIRE engine based at the CAL FIRE Groveland Station,
located approximately one mile west of Groveland, during the winter months. The CAL FIRE
Groveland Station also responds to emergency incidents within the District during the summer
wildland fire season, as available. Response personnel work a 72/96-hour shift of three
consecutive 24-hour days on duty, followed by four consecutive days off (GCSD 2020a).
Table 3-9: Department Facilities, Resources, and Staffing
Minimum
Staffing
Non-
Assigned Fire
Station Address Resource Type Fire
Resources Season
Season
5/1-
11/1-
10/30
4/30
Type-1 Engine 2 2
18930 State E-781
Type-1 Engine
GCSD Station 78 Highway 120 E-787
(Reserve)
Groveland, CA E-783
Type-3 Engine
CAL FIRE 11300 Merrill 2
E-4466 Type-3 Engine 3
Groveland Road Groveland,
E-4476 Type-3 Engine 3
Station CA
Total Daily Staffing 8 4
Note: Bold font indicates staffed apparatus
Source: GCSD 2020a.
3.4.3 Service Adequacy
There are no mandatory federal or state regulations directing the level of fire service staffing,
response times, or outcomes. Thus, the level of fire protection services provided is a local policy
decision and communities have the level of fire services they can afford, which may not always be
the level desired. However, if services are provided, all local, state, and federal regulations relating
to firefighter and citizen safety must be followed (GCSD 2020a). As recommended in the 2020 Fire
Master Plan, GCSD has adopted response/deployment standards in accordance with NFPA
standards which it has historically met and are intended for future performance measurement, as
well as planning for stations, staffing and equipment to be able to meet these standards in the
future.
Service response time includes three distinct components (1) 9-1-1 call processing/dispatch time;
(2) crew turnout time; and (3) travel time. Recommended best practices for these response
components for urban population density areas are 1:30 minutes, 2:00 minutes, and 4:00/8:00
minutes respectively for first-due and multiple-unit Effective Response Force (ERF) responses. For
rural response areas, they equate to 1:30 minutes, 2:00 minutes, and 10:30/16:00 minutes,
respectively. This slower response performance goal also generally results in less-desirable
outcomes including total building fire loss, lower serious emergency medical services (EMS)
survivability, and larger wildland fires. Table 3-10 summarizes the GCSD Fire Department’s 90th
percentile operational response performance over the previous three years (GCSD 2020a).
Table 3-10: Best Practice and GCSD Response Performance
Best Practice
Response Performance Component GCSD
Goal
Call Processing/Dispatch 1:30 0:46
Crew Turnout 2:00 4:25*
First-Due Travel 10:30 9:51
First-Due Call-to-Arrival 14:00 13:42
*Crew turnout performance cannot be accurately measured given current
CAL FIRE Tuolumne-Calaveras Unit Emergency Command Center
procedures.
Source: GCSD 2020a.
The 2020 Fire Master Plan Update found that the District is providing the best quality fire services it
can afford and is facing two primary challenges in its efforts to continue to maintain adequate fire
services: (1) long-term fiscal sustainability, and (2) daily staffing capacity (GCSD 2020a).
3.4.4 Operations and Capital Needs
Beginning in Fiscal Year (FY) 2016–17, and continuing again since FY 2018–19, the District has
spent more on fire services than it received in revenue. This is the result of several factors
including voter defeat of the District’s former parcel tax in 2012, minimal growth in the District’s
property tax base, an increase in revenues of 19 percent from FY 2014–15 to FY 2018–19
compared to an increase in expenditures of 63 percent over the same time, and a 50 percent
increase in the District’s CAL FIRE Schedule A contract cost over the same time. Tables 3-11 and
3-12 summarize projected Fire Fund expenditures and revenues through FY 2029-30 (GCSD
2020a).
Table 3-11 Projected Fire Service Costs - FY 2020-21 through FY 2024-25
Annual Projected Costs
Cost Category Change
Factor
FY FY FY FY FY
2020-21 2021-22 2022-23 2023-24 2024-25
CAL FIRE Schedule A Contract 5.00% 1,131,604 1,188,184 1,247,593 1,309,973 1,375,472
Operations/Maintenance 5.00% 76,124 79,930 83,927 88,123 92,529
District Administration 5.00% 21,007 22,058 23,161 24,319 25,535
Fire Fund Reserve 0.00% 26,500 26,500 26,500 26,500 26,500
Capital Replacement/Renewal 236,500 211,500 231,500 233,500 213,500
Total Projected Expenditures 1,777,873 1,828,616 1,928,147 2,013,655 2,081,337
Projected Revenue 1,142,871 1,174,452 1,208,541 1,244,167 1,280,862
Gap -635,002 -654,164 -719,607 -769,488 -800,475
Source: GCSD 2020a.
Table 3-12 Projected Fire Service Costs - FY 2025-26 through FY 2029-30
Annual Projected Costs
Cost Category Change FY FY FY FY FY
Factor 2025-26 2026-27 2027-28 2028-29 2029-30
CAL FIRE Schedule A Contract 5.00% 1,444,245 1,516,457 1,592,280 1,671,894 1,755,489
Operations/Maintenance 5.00% 97,156 102,013 107,114 112,470 118,093
District Administration 5.00% 26,811 28,152 29,559 31,037 32,589
Fire Fund Reserve 0.00% 26,500 26,500 26,500 26,500 26,500
Capital Replacement/Renewal 236,500 236,500 242,500 239,500 218,500
Total Projected Expenditures 2,196,404 2,299,074 2,397,578 248,157 2,645,065
Projected Revenue 1,318,658 1,357,588 1,397,685 1,438,986 1,481,525
- -
-877,746 -941,487 -999,893
Gap 1,044,171 1,163,540
Source: GCSD 2020a.
The County's assumption of the District’s CAL FIRE Amador Plan Agreement does not fully close
this budget gap, and the District would require an additional estimated $0.635 million in revenue
next fiscal year to close the projected gap to maintain current fire services, increasing
approximately five percent each subsequent year to an estimated $1.164 million in FY 2029-30.
Section 3.6.1.3 below identifies potential funding strategies for the District to consider to close this
revenue gap (GCSD 2020a).
The Fire Master Plan found that the Department’s physical resources are appropriate to protect
against the hazards likely to impact the District; however, the daily staffing of two to five career
response personnel and volunteers is barely adequate to safely perform the critical tasks
associated with small, emerging fires and routine single-patient EMS incidents. Even a best-case
staffing level of nine career personnel (two District personnel and seven CAL FIRE Groveland
Station personnel including a Chief Officer) is insufficient to safely and effectively perform the
critical firefighting/rescue tasks at a confined building fire, moderate vegetation/wildland fire,
serious multiple-patient EMS incident, or complex rescue incident in a timely manner without
additional assistance. In addition, the District is not geographically located for timely mutual aid,
thus a worst-case District staffing of two personnel reflects a likely outcome of not even being able
to confine building fires to the building or parcel of origin, an inability to confine a rapidly developing
vegetation/wildland fire, and the non-survival of some EMS patients (GCSD 2020a).
Recognizing that the District is currently providing the best fire services it can afford, according to
the Fire Master Plan, optimal daily operational response staffing for the District is six personnel
given the values to be protected and the risks. This could be achieved incrementally as funding
permits by adding one full-time equivalent (FTE) on the District engine, and one Amador Plan
firefighter during the winter months, with associated estimated annual costs as summarized in
Table 3-13 and Table 3-14. To help ease the fiscal transition associated with adding daily on-duty
staffing, the District could seek a Federal Emergency Management Agency (FEMA) Staffing for
Adequate Fire and Emergency Response (SAFER) grant that reimburses 75 percent of first- and
second-year costs, and 35 percent of third-year costs.
The District in 2021 created a Community Facilities District (CFD) to provide special tax funding
from new development projects within the District boundaries. The CFD is intended to fund the
difference in the cost of providing park and fire services to new development, and the amount of
property tax generated from the new development. In addition, in response to approval of two
additional resort development projects located outside the GCSD boundaries and SOI, the County
has been evaluating the possibility of adding a staffed fire station on the SR 120 corridor near
Groveland, or considering expansion of GCSD's boundaries and/or responses to the area under
contract. Calls generated from the new resort areas will require GCSD fire response in most
cases.
Table 3-13: Estimated Optimal Staffing Level Costs (FY 20-21 through FY 24-25)
Annual
FY FY FY FY FY
Expenditure Category Change
2020-21 2021-22 2022-23 2023-24 2024-25
Factor
CAL FIRE Schedule A Contract 5.00% 1,131,604 1,188,184 1,247,593 1,309,973 1,375,472
3.0 Additional Engineer FTEs 5.00% 616,497 647,322 679,688 713,673 749,356
Schedule A Contract Total 1,748,101 1,835,506 1,927,281 2,023,646 2,124,828
Source: GCSD 2020a.
Table 3-14: Estimated Optimal Staffing Level Costs (FY 25-26 through FY 29-30)
Annual
FY FY FY FY FY
Expenditure Category Change
2025-26 2026-27 2027-28 2028-29 2029-30
Factor
CAL FIRE Schedule A Contract 5.00% 1,444,245 1,516,457 1,592,280 1,671,894 1,755,489
3.0 Additional Engineer FTEs 5.00% 786,824 826,165 867,473 910,847 956,389
Schedule A Contract Total 2,231,069 2,342,623 2,459,754 2,582,741 2,711,879
Source: GCSD 2020a.
3.5 PARKS AND RECREATION
3.5.1 Service Overview
The GCSD owns and operates two parks: Mary Laveroni Community Park and Leon Rose Ball
Field and dog park. There is an amphitheater in the Mary Laveroni Community Park that consists
of a grassy area, one stage, storage area, concession stand and restrooms . In 2008, the County’s
Youth Center relocated to Mary Laveroni Community Park. The Mary Laveroni Community Park
also includes a dog park, a skate park, basketball court and a playground. In 2012, the parking lot
and lighting were upgraded at Mary Laveroni Community Park as a joint project with Tuolumne
County. Funding was provided by the Groveland Lighting District. The GCSD hopes to do more
improvements to Mary Laveroni Community Park as more Lighting District Funds become
available.
The Leon Rose Ball Field is used for softball games, and in the past years practice and league play
by the Tioga High School Boys Baseball Team and Girls Softball Team. The ballpark has
restrooms and lighting for night games (GCSD 2017a).
Community Facilities
Community events are held at Mary Laveroni Community Park in the stage area. The District has
been working to develop the Groveland Community Resilience Center, located partially on a parcel
of land donated by the District to the County. There is also a library and museum adjacent to the
Mary Laveroni Park that is operated by the Southern Tuolumne County Historical Society.
3.5.2 Operations and Capital Needs
As discussed above, the GCSD owns and operates two parks: Mary Laveroni Community Park and
Leon Rose Ball Field. These facilities are maintained annually, and improvements added regularly
with funding from grants and donations. The following maintenance improvements were
recommended in the GCSD Parks Master Plan:
Mary Laveroni Park (Upper Park)
• Replacing current play structures to make ADA compliant (completed in 2016).
• Routine maintenance of grounds, landscaping, trash receptacles, restrooms, parking
lot, and picnic areas.
• Park rules signage should be introduced in more locations to reinforce proper behavior
in the park.
Mary Laveroni Park (Lower Park)
• Routine maintenance of grounds, landscaping, trash receptacles, restrooms, parking
lot, picnic areas, and play structure could be improved to enhance image and condition
of the park;
• Park rules signage should be introduced in more locations to reinforce proper behavior
in the park;
• Maintenance is needed to the shade structure, storage, and amphitheater facilities.
Leon Rose Ballpark
• Accessibility of public restrooms needs to be verified;
• Accessibility improvement to and from parking lot (including signage) need to be
verified;
• Parking lot is in need of resurfacing, restriping and drainage improvements;
• Undertake certified ADA Compliance assessment to identify opportunities to improve
accessibility;
• Routine maintenance of grounds, landscaping, trash receptacles, restrooms, parking
lot, picnic areas and play structure could be improved;
• Park entrance signage could be improved to allow motorists travelling along Ferretti
road to more easily determine park location;
• Park rules signage should be introduced in more locations to reinforce proper behavior
in the park (GCSD 2017a).
3.6 DETERMINATIONS
3.6.1 MSR Review Factors
3.6.1.1 Growth
1. With the development of the Airport Estates and the Long Gulch project discussed above,
an additional 28 lots could be developed. Additionally, there are 807 vacant parcels within
the district that could be developed, resulting in growth occurring in the Groveland
Community Services District.
2. In the Groveland Community Service District, parcels can be divided or discretionary
permits issued to allow additional development that would be dependent on GCSD
services.
3.6.1.2 Disadvantaged Communities
1. The community of Groveland/Big Oak Flat has been identified as a disadvantaged
unincorporated community.
2. The Groveland Community Services District (GCSD) provides water, sewer, structural fire
protection, park and recreational services within its District.
3. The GCSD provides services and facilities to property owners, residents and visitors
within its District in an efficient manner.
3.6.1.3 Capacity of Facilities and Adequacy of Services
Water
1. The GCSD’s water system is adequate to serve the existing and future population until at
least 2034.
2. The GCSD should continue its efforts to transition their current metering system to a more
efficient, accurate and time efficient system.
3. The PML AWS WTP must be converted to a permanent alternative water treatment plant
due to the aging infrastructure of the Hetch Hetchy Mountain tunnel.
4. In the future, replacement of infrastructure may be necessary due to age-related
degradation and changes in regulations.
Wastewater
1. The GCSD sewer collection system within Groveland, areas of Pine Mountain Lake, and
Big Oak Flat is poor and requires repairs.
2. Repairs are needed in areas identified in the Engineering Report.
3. Repairs, rehabilitations, replacements, and capital improvements at the District’s WWTP
are needed. The various proposed upgrades include improvements to the headworks,
irrigation pump station, scum pump station, polymer activation system, screw press and
effluent pump station. Completing these improvements will increase the plant’s efficiency,
overall sustainability, and add redundancy within the facility.
4. The District's state operating permit for the wastewater treatment plant is nearly 40 years
old and will be updated when required by the state at an unknown time in the near future.
Significant improvements and upgrades to the treatment plant will likely be required by
new state regulations and in the updated state permit.
5. The District should plan system capacities in anticipation of planned future land annexations
and development in areas adjacent to its boundaries.
Fire Protection and Emergency Services
1. The District Board of Directors adopted the following fire deployment goals to deliver
outcomes that will save medical patients when possible upon arrival and to keep small
but serious fires from becoming more serious.
a. Distribution of Fire Stations: First-due response units should arrive within 14:00
minutes, 90 percent of the time from the receipt of the 9-1-1 call at the fire
dispatch center, which equates to a 90-second dispatch time, 2:00-minute crew
turnout time, and 10:30-minute travel time.
b. Multiple-Unit Effective Response Force (ERF) for Serious Emergencies: A
multiple-unit ERF, including at least one Chief Officer, should arrive within 19:30
minutes from the time of 9-1-1 call receipt at fire dispatch, 90 percent of the
time. This equates to a 90-second dispatch time, 2:00-minute company turnout
time, and 16:00-minute travel time.
c. Hazardous Materials Response: To provide hazardous materials response
designed to protect the community from the hazards associated with
uncontrolled release of hazardous and toxic materials, a fire-due response
should arrive within 14:00 minutes, 90 percent of the time from the receipt of the
9-1-1 call at the fire dispatch center to isolate the hazard, deny entry into the
hazard zone, and notify appropriate officials/resources to minimize impacts on
the community. Following initial hazard evaluation and/or mitigation actions, a
determination can be made whether to request additional resources from a
regional hazardous materials team.
d. Technical Rescue: To respond to technical rescue emergencies as efficiently
and effectively as possible with enough trained personnel to facilitate a
successful rescue, a first-due response unit should arrive within 14:00 minutes,
90 percent of the time from the receipt of the 9-1-1 call at the fire dispatch center
to evaluate the situation and/or initiate rescue actions. Following the initial
evaluation, assemble additional resources as needed within a total response
time of 19:30 minutes to safely complete rescue/extrication and delivery of the
victim to the appropriate emergency medical care facility.
2. The Department should work with the CAL FIRE Tuolumne-Calaveras Unit Emergency
Command Center to modify its procedures to accurately track crew turnout time.
3. The District should consider augmenting daily on-duty staffing as funding permits.
4. The District’s staffing would be much safer and more effective if a total of six firefighters
were always stationed in Groveland between the District and CAL FIRE.
5. The District should consider seeking voter approval off an annual parcel assessment or
special tax to provide necessary supplemental funding to, at a minimum, maintain current
fire protection services.
6. The District should consider seeking a cost recovery/reimbursement agreement with
Tuolumne County for the District’s percentage of total responses outside of the automatic
mutual aid zone.
Parks & Recreation
1. The services provided by the GCSD are adequate for the community.
2. The GCSD operates two public park facilities, including Mary Laveroni Community Park
and Leon Rose Ball Field.
3. The Groveland Youth Center is now located within Mary Laveroni Community Park. The
District has an MOU with Tuolumne County for the operation of the Youth Center.
4. Improvements are needed at both parks to meet ADA compliance.
5. Parking lot is in need of resurfacing, restriping, and drainage improvements at Leon Rose
Ball Field.
6. The community services currently provided by GCSD are adequate. Community events
are held at Mary Laveroni Community Park at two stage areas.
3.6.1.4 Financial Ability of Agency
1. The GCSD prepares a budget annually. Water and sewage rates were determined
through rate studies conducted in 2016 and 2018, respectively. These studies
determined that multi-year increases to the current rates were necessary to provide
sufficient revenue in both services to fund operations and capital improvements (GCSD
2019c). A portion of the sewer rate increases approved in 2018 was necessary for the
District to be in a financial condition to secure the $2.9 million loans and $4.8 million
grant from the State Water Resources Control Board for the collection system
improvements project.
2. It is the GCSD Board’s desire to strive to keep rates for water and sewer applied as
equitably as possible among current and future District customers. The Board has
directed the preparation of long term master plan updates in the fire, water and sewer
services to accurately understand current cost and the predictable, long term cost of
infrastructure and major equipment replacements. These infrastructure and operations
plans establish the financial framework to be used by the District to ensure that known
long term investments and costs are not deferred to future generations for the sake of
subsidizing low service rates today. The GCSD charges a fixed rate charge, a usage
rate and a debt service charge as discussed above. Other sources of revenue are
sought to off-set customer water and sewer rates, such as evaluating and updating
connection and capacity fees charged based on current capital improvement plans,
leasing property to cellular providers, charging for services such as new development
and building plan review and charging fees for certain permits and seeking grant
funding (GCSD 2019c). The District is in the process of implementing Development
Impact Mitigation fees for fire and park services, intended to offset the facility and
equipment impacts of new development projects and provide funding for service
capacity increases such as new fire engines, fire station expansion and new park
amenities to serve increased populations. The District is in the process of
implementing a Community Facilities District (CFD) to levy a special parcel tax on new
development projects to fund offset the fiscal impacts identified and the ongoing
operating expenses of fire and park services at levels meeting adopted standards.
3. The GCSD follows the Governmental Accounting Standings Board (GASB) 34
accounting standards.
4. The GCSD has incurred outstanding public debt for purchases, upgrades or
replacement of capital improvements such as sewage pump stations, water and sewer
lines, water and wastewater treatment facilities. The most significant source of debt is
from the capital facilities projects. The current debts are repaid through a per lot water
stand by fee, debt service charge, water and sewer enterprise fund revenues. The
GCSD has never defaulted on repayment of any bonds or other debt.
5. The funding sources for water and wastewater are from user rates. The fire and park
funds are special revenue funds and are funded with general property taxes. A fire
services special parcel assessment was not continued by the voters in 2012, and as a
result fire department staffing in the GCSD is now provided by CAL FIRE under a
Schedule A Cooperative Agreement. GCSD owns and operates the Groveland fire
station and provides/maintains all equipment and apparatus used by the CAL FIRE
staff. GCSD administers the fire service and manages its planning and finances.
6. As discussed in Section 3.4.4 above, since Fiscal Year (FY) 2016–17, the District has
spent more on fire services than it received in revenue. Five full time career fire staff
are needed to provide two persons on duty at all times, 24 hours per day, 365 days per
year. As detailed in the District’s 2020 Fire Master Plan Update, the current daily
staffing of two full time career response personnel is barely adequate. The District is
working with the County to plan for increased fire staffing in the region, and the GCSD
Board has directed evaluation of the cost and funding opportunities to increase full time
GCSD contracted staff to a minimum of 10 to provide 4 on duty at all times. Section
3.6.1.3 discusses recommendations to ensure that the department has adequate
funding.
7. The GCSD takes advantage of cost avoidance opportunities, including moving from
reactive maintenance programs to pro-active and preventative maintenance programs,
establishing infrastructure replacement reserves and replacing maintenance-intensive
infrastructure/equipment, cross-training personnel, better computer tracking of
operations, maintenance and finance, seeking grant funding, project performance
tracking and developing a 5-year running budget. The District is also updating its 20
year old water and sewer Master Plan which will include a comprehensive Capital
Improvement Plan. The District has secured over $9 million in state grant funding in
the past year for critical infrastructure projects and refinanced outstanding debt to
lower interest rates and cost.
8. The five-member Board of Directors receive a stipend per meeting, which is
determined at the first meeting of each fiscal year in July.
9. The District is under a Schedule A contract with CAL FIRE. The Schedule A contract
provides for five (5) fire fighters total that rotate; one (1) captain and four engineers.
Two (2) bodies man the station 24/7. When the state declares the official end to a fire
season, funding is halted for the CAL FIRE Schedule B station located on Merrell Rd.
Prior to the 2020/21 fiscal year, the District funded the staffing of two (2) fire fighters at
this station through an Amador Plan contract. The financial obligation for the cost of the
Amador Plan contract was assumed by the County of Tuolumne effective July 1, 2020.
10. There is an adequate number of customers within the GCSD to pay the current
operating costs for providing water and sewer services , however due to varying
topography, significant mechanical and complex infrastructure and a relatively low
number of customers, the cost per customer to operate the system will be much higher
than that of more urbanized areas.
11. It is likely that additional parcels will be annexed, improved or divided in the future
which would increase the number of customers paying water and sewer fees , however
due to varying topography, significant mechanical and complex infrastructure and a
relatively low number of customers, the cost per customer to operate the system will
be much higher than that of more urbanized areas.
.
3.6.1.5 Shared Facilities
1. The Groveland Lighting District could be reorganized to be a part of the GCSD. The
GCSD would then be responsible to maintain lighting, add lighting, make public
improvements related to lighting. This would also increase funding opportunities for the
GCSD.
2. The Mary Laveroni Park parking lot is shared for use by the Yosemite Area Regional
Transit (YARTS) as a primary stop. The park parking lot is also shared through
easement agreements with PG&E for a PIH to allow for the provision of power to the
Groveland business district during PSPS events, and for access from Hwy 120 to the
county operated Teen Center, Electric Vehicle Charging Station and Library/Museum.
3.6.1.6 Accountability, Structure, and Operational Efficiencies
1. There are very few government structure options currently available to the
Communities of Groveland and Big Oak Flat and the GCSD.
2. Changing the governmental structure in GCSD is generally not feasible. The CSD is an
efficient way to provide public services, such as water, sewer, fire, parks and
recreation, to the area.
3. Landowners within the GCSD service area are adequately provided water, wastewater,
fire protection, emergency, community facilities, and parks and recreation services.
4. The Groveland Lighting District could be reorganized to be a part of the Groveland
Community Services District. The potential for this reorganization is discussed further
below.
5. The Groveland Community Services District has reduced its staff from 33 full time
employees in 2007, to 23 full time employees in 2012, to 19 full-time employees in
2019. The GCSD now employees 21 full time employees.
6. It is reasonable to conclude that management is efficient.
7. The GCSD’s outreach program includes distribution of articles about the District and
maintaining a website. The District website design engine is a special service provided
to California local government, updated continuously to ensure continuous compliance
with all state laws and requirements including SB 929. The District received recognition
for Excellence in Transparency issued in 2019 by the Special District Leadership
Foundation of the California Special Districts Association.
8. The GCSD conducts business during the regularly scheduled monthly meetings that
are open to the public, in compliance with the Brown Act. As of 2020, all meetings are
also broadcast and public input taken via the Zoom meeting platform.
9. There is an e-mail address on the website maintained by the GCSD where customers
can send comments and/or request information.
10. The GCSD solicits customer feedback and comments from property owners within the
District. Customers can submit feedback electronically on the District website,
physically at the District office, and the District board meetings.
4 SPHERE OF INFLUENCE
4.1 SOI UPDATE
LAFCo prepares a MSR prior to or in conjunction with the SOI Update process. An SOI Update
considers whether a change to the SOI, or probable future boundary, of a local government agency
is warranted to plan the logical and orderly development of that agency in a manner that supports
CKH Law and the Policies of the Commission. The MSR and required determinations are
presented in Chapter 3 of this document and form the basis of information and analysis for this SOI
Update. This chapter presents the SOI Update and required determinations pursuant to California
Government Code §56425(e) for GCSD.
4.1.1 Existing Sphere of Influence
The existing SOI for GCSD is larger than the District boundary. The SOI for the GCSD was
established concurrently with formation of the Community Services District. There have not been
any reorganizations of the GCSD or changes in its Sphere of Influence since its establishment. The
existing Sphere of Influence boundary for the GCSD is farther reaching than the existing District
boundary. In its contract for water with the City of San Francisco and SFPUC, the GCSD’s SOI was
referred to as its “contract area.” The contract area is the extent to which the SFPUC will supply
water to GCSD (Figure 2) (Tuolumne County LAFCo 2013).
4.1.2 Study Areas
See Study Areas in Figure 6.
Airport Estates Subdivision
The Airport Estates Subdivision consisting of 21.6± acres and 9 parcels, was approved by
Tuolumne County in 2018; however, the subdivision has not been developed. This subdivision is
located immediately east of the Pine Mountain Lake Subdivision. The parcels range in size from
approximately 2 to 2.9 acres. The 21.6-acre property was rezoned from AE-37:AIR (Agricultural
Exclusive, Thirty-Seven-Acre Minimum Airport Combining) to RE-1:AIR (Residential Estate, One-
Acre Minimum Airport Combining); and included a General Plan Amendment to change the land
use designation from Rural Residential (RR) to Low Density Residential (LDR). The proposed
residential subdivision is intended for homeowners with private airplanes to be able to access the
adjacent Pine Mountain Lake Airport.
The Subdivision is not located within the GCSD service area boundary; however, the entirety of the
project is located within its SOI (Tuolumne County 2018b). Although not a condition of approval for
the subdivision, the project developer has entered into agreement with GCSD provide water
service to all lots and sewer service to one lot within the Subdivision. The GCSD agreed to annex
the proposed project to its service area to provide water, sanitary sewer, fire and parks services on
the condition that the applicant assume all expenses related to annexation, design, preparation of
plans, specifications, development, construction and installation of the necessary improvements to
extend GCSD services (GCSD 2020e). To facilitate water and sewer service being provided to this
subdivision, an application requesting annexation and an annexation agreement has been
approved by GCSD’s Board of Directors. GCSD has conducted an analysis of the capacity of its
sewer and water facilities to accommodate the Airport Estates project. LAFCO will be able to
accept the annexation application for processing upon completion of the GCSD MSR/SOI Update.
In the interim, the Tuolumne LAFCo approved an Out of Boundary Service Agreement on October,
8, 2020 to allow provision of water and sewer services to Lots 1 through 8 of the Airport Estates. A
condition of approval requires the GCSD and property owner to complete an annexation of the
property within one year of the approval of the Agreement.
Long Gulch Ranch Subdivision
The Long Gulch project would result in 19 residential lots, ranging in size from approximately 3.0±
acres to 12.5± acres. The project proposes to use on-site wells and private septic systems. It is
unclear what impact there will be on GCSD’s emergency services. The project is located within the
District’s SOI and is eligible for application for annexation.
GCSD is strongly recommending annexation of the project for the purpose of extension of water
service and installation of fire hydrants, sewer service, and to receive fire and park/recreation
services. Due to the close proximity of this project to the District boundaries and infrastructure,
additional development being proposed in the vicinity, the drought related failure of groundwater
wells in the region and the need for costly upgrades to the District wastewater plant/small current
customer base; connection of this project to the public systems should be required.
Terra Vi
Terra Vi Lodge Yosemite is a master planned hotel lodging development designed to address the
increased demands for eco-sensitive resorts and local recreation tourism. The project is comprised
of various single, two- and three- story buildings and structures beginning at the northwest
entrance of Sawmill Mountain Road and continuing northeast as it unfolds and curves back
towards SR120. Elements of the project include a public market, general lodge with 100
guestrooms, two manager’s suites, and multi-purpose uses, indoor and outdoor areas, and seven
guest cabins providing 26 guestrooms, as well as five employee apartments with four rooms in
each unit, for a total of 20 employee rooms. It is estimated that the buildings would host an
average of 104 guests, and they would accommodate a maximum occupancy of 156 guests.
The project is located outside of the GCSD boundaries and SOI. However, all hazard emergency
response service to the project site and the surrounding area is currently provided by the GCSD,
though resources from other providers (CALFIRE, USFS, NPS) also could be dispatched to the site
depending on the type of incident and resource availability. The GCSD responds to emergencies
within its District, and also to out-of-District areas like the project site and the surrounding area
through its mutual aid agreement with the County.
To assist with the provision of emergency response services to the project site, the project
applicant has agreed to financially support emergency response efforts on the Highway 120
corridor. The County is currently in the process of determining an appropriate fair-share fee for the
project, which would be based on per unit of lodging. Proceeds from the fee would be utilized to
offset the cost of providing emergency services to the project, and to assist the County with
equipment and staffing needs. (Tuolumne County 2020c)
The language of the project’s condition of approval reflects the possibility that the future will bring
changes to the funding of emergency services. Currently, the County is conducting a study
evaluating the potential for a commercial County Services Impact Fee to be adopted. Regardless if
an impact fee is adopted, the County will collect the developer’s fair share of their draw on
emergency services. Additional efforts by County staff are underway to increase emergency
response availability on the Highway 120 corridor. Therefore, at this time, it is not certain how the
fair share payment will be made. In the event that at the time of the issuance of the building permit
for this project, no other fees or assessments have been adopted by the Board of Supervisors to
fund the cost of providing emergency response to the project site, the applicant will be required to
pay an fair share contribution to Tuolumne County for their use of emergency services. This fair
share fee will be collected for the life of the project, or until another substantially similar funding
mechanism is in place. (Tuolumne County 2020c)
Yosemite Under Canvas Project
The Under Canvas project is a transient, 99-tent campground with supporting facilities located
adjacent to SR 120 in the vicinity of Hardin Flat, east of the community of Groveland. The camp will
operate March through October, as weather allows. Potable water and sanitary sewer is provided
by on-site systems owned and operated by Under Canvas (ESA 2020). Mitigation measures for the
project include fire prevention planning review by agencies, including the GCSD, for construction
and operations.
Similar to the Terra Vi project, all hazard emergency response service to the project site and
surrounding areas is also provided by the GCSD, which responds to emergencies within its
boundaries and also to out-of-district areas through its mutual aid agreement with the County. To
assist with the provision of emergency response services to the project site, the project applicant
has agreed to financially support emergency response efforts on the Highway 120 corridor. The
County is currently in the process of determining an appropriate fair-share fee for the project, which
would be based on per unit of lodging. Proceeds from the fee would be utilized to offset the cost of
providing emergency services to the project, and to assist the County with equipment and staffing
needs. (ESA 2020) (See also Section 2.4)
Groveland Lighting District
The Groveland Lighting District (GLD) was created in 1919 to place electric lights in the downtown
Groveland area of Tuolumne County. The GLD is governed by the Highway Lighting District Act of
1941, Streets and Highway Code Section 19000 et seq. The County of Tuolumne currently
operates the Groveland Lighting District, which is governed by the County Board of Supervisors.
The Groveland Lighting District is approximately 239 acres and located entirely within the GCSD
and SOI boundary (Tuolumne County 2020b).
The GLD is funded through a portion of the ad valorem property taxes paid by the owners of the
parcels within the District. In FY 2018-19, District revenues were $28,404 and expenses were
$2,439. GLD expenses typically consist of paying power bills for the streetlights and changing
bulbs in the lights. The District revenues typically exceed the expenses; consequently, the GLD
has accumulated a maintenance fund of approximately $410,594 (beginning balance, FY 2019-20).
(Tuolumne County 2020b)
During the 2012 Municipal Review of the Groveland Lighting District, LAFCo recommended that
the Groveland Lighting District be dissolved, and future lighting services be provided by the GCSD.
Community Facilities District
In June 2021 the GCSD sought adoption of a resolution of intention for the formation of a
Community Facilities District (CFD) within the boundaries of the GCSD to fund the cost of
expanding fire and park services in the future as population and service demand increase. The
CFD is intended to offset and mitigate the fiscal impact of new development on these services, and
applies only to properties that have annexed to the CFD. Tuolumne County's approval of new land
development projects and issuance of certain county building permits would be conditioned on
annexation into the CFD and a special tax would then be levied on the properties that annex into
the CFD.
Properties are only qualified to annex under the following conditions:
1. New construction or complete demolition and redevelopment of residential projects
2. New construction or complete demolition and redevelopment of hotel projects
3. New construction or complete demolition and redevelopment of RV park projects
4. New construction or complete demolition and redevelopment of commercial/industrial
projects
5. Building additions (commercial/industrial) that increase total on-site building footprint by
at least 100%
6. Any future projects that are likely to impose negative fiscal impacts to CSD services, as
determined by CSD staff.
The services to be funded, in whole or in part, by the CFD would consist of services authorized
under Section 53313 of the Government Code, including, but not be limited to, fire protection and
suppression services, ambulance and paramedic services, and park maintenance and landscaping
services. These services may include direct and incidental costs related to providing for the
maintenance of public infrastructure within the area of the CFD and areas adjacent to or in the
vicinity of such areas. In addition, the CFD may fund the following related services: furnishing,
operating and maintaining equipment, apparatus or facilities related to providing the services and/
or equipment, apparatus, facilities or fixtures in areas to be maintained, paying the salaries and
benefits of personnel necessary or convenient to provide the Services, payment of insurance costs
and other related expenses and the provision of reserves for repairs and replacements and for the
future provision of services. It is expected that the services would be provided by the GCSD, either
with its own employees or by contract with third parties, or a combination thereof. The services to
be financed by the CFD are in addition to those provided in the territory of the CFD before the date
of creation of the CFD and would not supplant services already available within that territory
if/when the CFD is created. As previously discussed, the District is planning to expand park
facilities and operations, as well as to increase fire department staffing as demand increases and
funding is available in the future.
4.1.3 Proposed SOI Changes
There is no current proposal by the GCSD to expand or reduce its SOI. There is no anticipated
change to the provision of water, wastewater and parks and recreation services. However, there
exists a demand for GCSD fire and emergency response services as the primary responding entity
outside its boundaries, mutual aid boundaries, and SOI. The GCSD continues to work closely with
Tuolumne County through the discretionary entitlement process for pending applications (4.1.2
Study Areas) to identify impacts and mitigation for providing fire and emergency services to these
areas, particularly along the SR-120 corridor.
A portion of the District SOI bisects a developed residential community known as Prospect Heights,
which contains approximately 85 lots. The District provides all-hazard emergency response to this
location under its mutual aid agreement, and the number and frequency of calls to this location are
increasing, possibly due to an aging population. A potential expansion of the SOI could be
considered to encompass the entire development since services are regularly provided to that
location and it one of the more densely developed areas near the District boundaries.
4.1.4 Consistency with LAFCo Policies
The District is comprised of a historical mixed use residential and commercial community with a
visitor-oriented economy and open space resources. Affirming the District’s 2013 SOI is consistent
with LAFCO Policies.
4.2 DETERMINATIONS
It is recommended that the Commission affirm the existing SOI for the GCSD. The following
statements have been prepared in support of this recommendation.
4.2.1 Land Uses
➢ The present and planned land uses in the area, including agricultural and open space
lands.
The GCSD contains a combination of residential, commercial, industrial, and recreational land
uses and densities. Land use designations within the District include Parks and Recreation (R/P),
Public (P), Open Space (O), Low Density Residential (LDR), Medium Density Residential (MDR),
High Density Residential) (HDR), Estate Residential (ER), Homestead Residential (HR), Rural
Residential (RR), Large Lot Residential (LR), Agricultural (AG), Neighborhood Commercial (NC),
General Commercial (GC), Mixed-Use (MU), Business Park (BP), Light Industrial (LI), Heavy
Industrial (HI), Special Commercial (SC) and Heavy Commercial (HC) General Plan Land Use
designations as provided in the Tuolumne County General Plan.
The area surrounding the GCSD and SOI also contains residential zoning which will allow for
future development. The area surrounding the District is primarily rural residential, agricultural and
forest.
4.2.2 Need for Facilities and Services
➢ The present and probable need for public facilities and services in the area.
The District provides structural fire protection and emergency services, water service, sewer
service, park/recreation services and community facilities management to the areas of Big Oak
Flat, Groveland and Pine Mountain Lake. Other service providers/districts encompassing these
areas include the County of Tuolumne, the Tuolumne County Resource Conservation District, and
County-wide Ambulance District (Tuolumne County LAFCo 2013). The GCSD is estimated to serve
a population of approximately 4,500 residents in the winter months and up to 9,000 on busy
summer weekends. The residents and visitors currently receiving services from the District will
continue to need these public services. Additionally, as discussed above, it is recommended that
the 239-acre Groveland Lighting District, which funds lighting in the downtown Groveland area, be
dissolved and future lighting services be provided by GCSD.
The Study Areas discussed in Section 4.1.2 will impact the District’s provision of fire protection and
emergency services due to their location along the SR-120 corridor. Because the District
participates in Mutual Aid Agreements with other local, state and federal emergency response
agencies in the area (CAL FIRE, USFS, County), it routinely provides emergency services outside
of its boundaries and SOI. In response to the Study Area developments, the County is undertaking
a study to determine appropriate funding mechanisms and structures to fund the cost of
emergency services in the area.
To ensure that the adopted district response times and service standards are not negatively
impacted by emergency response provided to continued growth outside the District boundaries, the
County should conduct the following Fire Services review studies for the Hwy 120 corridor:
a. Risk Assessment Standards of Cover
b. Fire services and deployment/response standards
These reports will allow the county and district to appropriately plan geographically and financially
for the fire stations, equipment and staffing resources to ensure that fire services can meet
adopted standards and service levels as the region grows and emergency calls increase.
Establishment of these plans and standards will also allow for the ongoing future evaluation of the
District services against its adopted deployment and coverage standards.
4.2.3 Capacity of Facilities and Adequacy of Services
➢ The present capacity of public facilities and adequacy of public services that the agency
provides or is authorized to provide.
As determined in the MSR prepared for the District, the GCSD requires updates and repairs to
existing infrastructure, facilities and equipment to meet current and future demands for public
services within the next five years. The GCSD water supply and system is adequate to serve the
existing and future population until at least 2034. The PML AWS WTP must be converted to a
permanent alternative water treatment plan due to aging infrastructure of the Hetch Hetchy
Mountain tunnel. The MSR determined that the GCSD sewer collection system is poor and
requires repairs and the District has planned, funded and is proceeding with construction of
necessary repairs. The district has spent more on fire services than it received in revenue since
Fiscal Year (FY) 2016-17, thus the District should consider seeking voter approval off an annual
parcel assessment or special tax to provide the necessary supplemental funding to, at a minimum,
maintain current fire protection services. The District also needs to implement its approved
Development Impact Fees and Community Facilities District to assist in funding the park and fire
services expenses as well as to offset the impacts and prepare for new development.
The Study Areas discussed in Section 4.1.2 will impact the District’s provision of fire protection and
emergency services due to their location along the SR-120 corridor. In response to the increasing
demand for out-of-District emergency service provision, the District has identified the need for
additional funding for increased staffing and equipment resources or the location of a funded,
staffed County fire station on the Hwy 120 corridor. The County has agreed to fund the Amador
contract with CAL FIRE for a three-year period. Further, in response to the proposed developments
along the SR-120 corridor outside the District’s boundaries and SOI, the County is undertaking a
study to determine appropriate funding mechanisms and structures to fund the cost of emergency
services in the area.
It is also recommended that the county undertake the study discussed above to determine the
number of fire station and level of staffing resources and equipment needed to meet deployment
and response standards to be adopted for the region. This will determine the amount of revenue
needed to fund the cost of the emergency services and establish the fair-share funding amounts
mentioned.
4.2.4 Communities of Interest
➢ The existence of any social or economic communities of interest in the area if the
commission determines that they are relevant to the agency.
The Airport Estates and Long Gulch Subdivisions are included in the Sphere of Influence, which
makes them eligible to be annexed into the District boundary upon application to LAFCo (GC
Section 56375.5).
The proposed projects known as Terra Vi, and Yosemite Under Canvas and the existing Rush
Creek Lodge, Evergreen Lodge, Berkeley Camp, Camp Tuolumne Trails, (San Jose) Family Camp
are recreation lodging/camping projects along the SR-120 corridor. The projects are located
outside of the GCSD boundary and the SOI as well. Guests at these projects, as well as offsite
traffic generated by the projects could increase the impact on emergency and fire services, which
are provided by the District in conjunction with other local EMS entities.
4.2.5 Disadvantaged Unincorporated Communities
➢ The present and probable need for those public facilities and services of any disadvantaged
unincorporated communities within the existing sphere of influence.
As discussed in Section 2.6 above, the Groveland community is a disadvantaged unincorporated
community. Groveland has a MHI of $31,587 per year while the MHI for the State of California is
$61,632 per year. Eighty percent of the statewide MHI is $49,306 per year. Since the MHI of the
Groveland community is less than 80%, if the statewide MHI, the Groveland community is
considered a disadvantaged unincorporated community consistent with LAFCo Policy.
5 REFERENCES
ESA. 2020a. Yosemite Under Canvas Draft Environmental Impact Report. Prepared for
Tuolumne County Community Resources Agency. Accessed February 14, 2021 at
https://www.tuolumnecounty.ca.gov/1204/Under-CanvasHardin-Flat-LLC.
2020b. Yosemite Under Canvas Final Environmental Impact Report. Prepared for
Tuolumne County Community Resources Agency. Accessed February 16, 2021 at
https://www.tuolumnecounty.ca.gov/1204/Under-CanvasHardin-Flat-LLC.
Groveland Community Services District (GCSD). 2020a. 2020 Fire Master Plan Update. Prepared
by CityGate Associates, LLC.
2020b. Agency Facilities and Infrastructure. Prepared by am Consulting Engineers.
2020c. Meet the Board- Groveland Community Services District. Accessed October 6, 2020
at https://www.gcsd.org/meet-the-board
2020d. GCSD Response to HELIX Environmental Planning Memo Titled Tuolumne County
LAFCo – Groveland Community Services District MSR/SOI Update – Follow-up Questions.
Dated September 21, 2020.
2020e. Annexation Agreement by and between the Groveland Community Services District
and Mid Valley Aviation, LLC regarding the parcels in the Airport Estates Subdivision.
2019a. GCSD Organizational Chart.
2019b. Sewer System Management Plan Update. Prepared by am Consulting Engineers.
2019c. Fee Schedule for Fiscal Year 2019-2020.
2019d. Financial Statements with Independent Auditor’s Report, Year Ended June 30,
2019.
2018a. Sewer Rate Study. Prepared by Bartle Wells Associates.
2018b. Financial Statements with Independent Auditor’s Report, Year Ended June 30,
2018.
2017a. Groveland Community Services District Parks Master Plan.
2017b. Financial Statements with Independent Auditor’s Report, Year Ended June 30,
2017.
2016a. 2015 Urban Water Management Plan. Prepared by am Consulting Engineers.
2016b. Financial Statements with Independent Auditor’s Report, Year Ended June 30,
2016.
2010. GCSD Operational Policies & Procedures Manual. Adopted October 11, 2010.
Tuolumne County. 2020a. GCSD Boundary and Spere of Influence GIS Shapefile.
2020b. Tuolumne County Department of Public Works Memorandum: Dissolution of the
Groveland Lighting District. March 31, 2020.
2020c. Terra Vi Staff Report: Certification of Environmental Impact Report and Public
Hearing for Site Development Permit SDP18-003. November 23, 2020. Accessed February
16, 2021 at https://www.tuolumnecounty.ca.gov/DocumentCenter/View/15414/12-1-20-
TCPC-Agenda.
2019a. Housing Element.
2019b. Parcel Data Shapefile.
2018a. Tuolumne County General Plan.
2018b. Initial Study/Mitigated Negative Declaration Tentative Subdivision Map TSM17-002,
Zone Change RZ17-009 and General Plan Amendment GPA17-008. Prepared by Raney
Planning and Management, Inc.
1953. Resolution #9: Groveland Community Service District Formation, signed August 19,
1953.
Tuolumne County Local Agency Formation Commission (Tuolumne County LAFCo). 2013.
Municipal Service Review for the Groveland Community Services District.
Tuolumne County Transportation Council (TCTC). 2016. 2016 Final Regional Transportation Plan.
Accessed September 29, 2020 at
https://www.tuolumnecountytransportationcouncil.org/single-post/2016/07/13/2016-regional-
transportation-plan-update.
United States Department of Commerce (Census). 2010. 2010 Census Population and Housing:
California: 2010. Accessed on August 27, 2020 at
https://www.census.gov/prod/cen2010/cph-2-6.pdf
6 ACRONYMS
ADD Average Daily Demand
AF Acre-feet
AWS Alternative Water System
BLM Bureau of Land Management
BOE Board of Equalization
CCR California Code of Regulations
CCTV Closed-Circuit Television
CEQA California Environmental Quality Act
CDP Census Designated Place
CKH Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000
CRWQCB California Regional Water Quality Control Board
CSD Community Services District
CWSRF Clean Water State Revolving Fund
DPH Department of Public Health
EMS Emergency Management Services
EPA Environmental Protection Agency
ERF Effective Response Force
FEMA Federal Emergency Management Agency
FTE Full Time Equivalent
FY Fiscal Year
GC Government Code
GCSD Groveland Community Services District
GHG Greenhouse gas emissions
GPM gallons per minute
HCD Housing and Community Development
ISO Insurance Service Office
LAFCo Local Agency Formation Commission
MDD Maximum Day Demand
MG million gallons
MGD million gallons per day
MHI Median household income
MPO Metropolitan Planning Organization
MSR Municipal Service Review
NASSCO National Association of Sewer Service Companies
NPDES National Pollutant Discharge Elimination System
PACP Pipeline Assessment Condition Program
PHD Peak Hour Demand
PMLA Pine Mountain Lake Homeowner’s Association
RHNA Regional Housing Needs Assessment
RTP Regional Transportation Plan
RV Recreational Vehicle
SAFER Staffing for Adequate Fire and Emergency Response
SB Senate Bill
SFPUC San Francisco Public Utilities Commission
SOI Sphere of Influence
TCTC Tuolumne County Transportation Council
USFS United State Forest Service
UV Ultraviolet
UWMP Urban Water Management Plan
WTP Water Treatment Plant
WWTP Wastewater Treatment Plant
7 ACKNOWLEDGEMENTS
7.1 REPORT PREPARATION
This MSR/SOI Update was prepared by Helix Environmental, Inc. and Hinman & Associates
Consulting, Inc.
Robert Edgerton, Project Manager, Helix Environmental Planning, Inc.
Dan Van Essen, Planner, Helix Environmental Planning, Inc.
David Ludwig, Planner, Helix Environmental Planning, Inc.
Uma Hinman, Hinman & Associates Consulting, Inc.
7.2 ASSISTANCE AND SUPPORT
This MSR/SOI Update could not have been completed without the assistance and support from the
following organizations and individuals.
Groveland Community Services District
Peter Kampa, General Manager
Jennifer Flores, Administrative Services Manager
Rachel Pearlman, Administrative Services Technician II
Tuolumne County LAFCo
Quincy Yaley, Executive Officer
S:\Commissions\LAFCO\MSRs\GSCD 2020\Admin Draft\MSR_GCSD_6 6 2022 FINAL.doc
!(
!(
Vicinity Map
Figure 1
dxm.paM
ytiniciV_1giF\tropeR\dxm\SIG\10.30-OUT\retsaM
OCFAL_30-OUT\LLA-OUT\T\STCEJORP\:S
GCSD MSR and SOI Update
Sphere of Influence
Groveland CSD
TuolumneRiver
Pine
Mountain
Lake
¬«
120
Pine Mountain
Lake
Groveland
¬«
49
K
Source: Basemap (Airbus 2018); Data (Tuolumne County 2020)
0 6,000Feet
!(
!(
Groveland CSD and Sphere of Influence Boundary
Figure 2
dxm.IOS
dna
RSM_2giF\tropeR\dxm\SIG\10.30-OUT\retsaM
OCFAL_30-OUT\LLA-OUT\T\STCEJORP\:S
GCSD MSR and SOI Update
Sphere of Influence
Groveland CSD
TuolumneRiver
Pine
Mountain
Lake
¬«
120 Pine Mountain Lake
Groveland
¬«
49
K
Source: Aerial (Maxar 2019); Data (Tuolumne County 2020)
0 6,000Feet
!(
Waterlines
Figure 3
dxm.senilretaW_3giF\tropeR\dxm\SIG\10.30-OUT\retsaM
OCFAL_30-OUT\LLA-OUT\T\STCEJORP\:S
GCSD MSR and SOI Update
Sphere of Influence
Groveland CSD
Existing Waterlines
TuolumneRiver
Pine
Mountain
Lake
Groveland
¬«
120
¬«
49
K
Source: Aerial (Maxar 2019); Data (Tuolumne County 2020)
0 6,000Feet
Groveland CSD Sewer Lines
Legend
GCSD Boundary
GCSD
Boundary
Sphere of Influence
Sphere of
Influence
Sewer Lines
Gravity
Force
!(
Fire Stations and Hydrants
Figure 5
dxm.stnardyH
dna
snoitatS
eriF_5giF\tropeR\dxm\SIG\10.30-OUT\retsaM
OCFAL_30-OUT\LLA-OUT\T\STCEJORP\:S
GCSD MSR and SOI Update
Sphere of Influence
Groveland CSD
Existing Fire Stations
Existing Fire Hydrants
TuolumneRiver
Pine
Mountain
Lake
Groveland
¬«
120
¬«
49
K
Source: Aerial (Maxar 2019); Data (Tuolumne County 2020)
0 6,000Feet
!(
Sphere of Influence Study Areas
Figure 6
dxm.saerA
ydutS_6giF\tropeR\dxm\SIG\10.30-OUT\retsaM
OCFAL_30-OUT\LLA-OUT\T\STCEJORP\:S
GCSD MSR and SOI Update
Sphere of Influence
Study Areas
TuolumneRiver
Pine
Mountain
Groveland Lighting
Lake
District
Airport Estates
Mid-Valley Aviation
Groveland
¬«
120
¬«
49
K
Source: Aerial (Maxar 2019); Data (Tuolumne County 2020)
0 6,000Feet