LAFCO
Drainage Districts MSRFinal
Read the report at Local Agency Formation Commissions ↗
MMUUNNIICCIIPPAALL SSEERRVVIICCEE RREEVVIIEEWW
DDRRAAIINNAAGGEE SSEERRVVIICCEESS
SPECIAL DISTRICTS
Oxnard Drainage District No. 1
Oxnard Drainage District No. 2
Prepared for:
Ventura LLooccaall AAggeennccyy FFoorrmmaattiioonn CCoommmmiissssiioonn
800 South Victoria Avenue
Ventura, California 93009-1850
February 16, 2005
This Page Intentionally Left Blank
Table of Contents
TTAABBLLEE OOFF CCOONNTTEENNTTSS
I. EXECUTIVE SUMMARY.....................................................................................................1
II. SERVICE REVIEW PROCESS............................................................................................3
III. VENTURA COUNTY DRAINAGE DISTRICTS................................................................4
A. Background..................................................................................................................4
B. Agency Profiles............................................................................................................5
C. Growth and Population.................................................................................................8
D. Infrastructure Needs and Deficiencies.........................................................................8
E. Financing Constraints and Opportunities, Cost Avoidance Opportunities and
Rate Restructuring...........................................................................................9
F. Opportunities for Shared Facilities, Evaluation of Management Efficiencies
and Government Structure Options...............................................................10
G. Local Accountability and Governance.......................................................................18
IV. DETERMINATIONS............................................................................................................19
A. Oxnard Drainage District No. 1.................................................................................19
B. Oxnard Drainage District No. 2.................................................................................21
LLIISSTT OOFF TTAABBLLEESS
Table III-1: Oxnard Drainage District No. 1 Financial Data.........................................................10
Table III-2: Oxnard Drainage District No. 2 Financial Data.........................................................10
Table III-3: Drainage District Audits.............................................................................................11
Table III-4: Oxnard Drainage District No. 1 Special Study Areas (Map 2)..................................14
Table III-5: Oxnard Drainage District No. 2 Special Study Areas (Map 3)..................................16
Table III-6: Oxnard Drainage District No. 1 – Board Members and Terms..................................18
Table III-7: Oxnard Drainage District No.2 – Board Members and Terms...................................18
LLIISSTT OOFF MMAAPPSS
Map 1: Oxnard Drainage Districts No. 1 and 2..................................................................................7
Map 2: Oxnard Drainage District No. 1 – Special Study Areas.......................................................15
Map 3: Oxnard Drainage District No. 2 – Special Study Areas.......................................................17
Final i February 16, 2005
This Page Intentionally Left Blank
I. Executive Summary
II.. EEXXEECCUUTTIIVVEE SSUUMMMMAARRYY
The Municipal Service Review for Drainage Services includes two drainage districts located in
Oxnard. Both Districts were formed under the Drainage District Act of 1903, and are among the
oldest special districts in Ventura County. Oxnard Drainage District No. 1 was formed in 1918 and
Oxnard Drainage District No. 2 was formed in 1926. Both are single-purpose, independent,
landowner-voter districts, with a three person governing board elected to four year terms from the
landowners within each district.
Both Drainage Districts were formed to install and operate sub-surface drains to lower the water table
in the Oxnard Plain so the surface lands could be tilled for agricultural purposes. Bonds were
originally sold to pay for installing the system of sub-surface drains in each District, and the bonds
were fully paid years ago. Today the primary function of the Districts is to maintain the drainage
systems.
Municipal service reviews are a new requirement for LAFCos and are intended to promote more
efficient services, to identify areas of improvement and to assess service provision in relation to
boundaries and spheres of influence (SOI). Service reviews do not directly change the provision of
service but are a source of comprehensive information LAFCo can use in future actions.
LAFCo must conduct service reviews prior to or in conjunction with the mandated five-year schedule
for updating SOIs. The service review report must include an analysis of the issues and written
determinations for each of the following:
• Infrastructure needs or deficiencies;
• Growth and population projections for the affected area;
• Financing constraints and opportunities;
• Cost avoidance opportunities;
• Opportunities for rate restructuring;
• Opportunities for shared facilities;
• Government structure options, including advantages and disadvantages of the consolidation or
reorganization of service providers;
• Evaluation of management efficiencies; and
• Local accountability and governance.
The service review process for the Drainage Districts began in June and will be completed in
February of 2005. A four-part questionnaire was sent to the agencies requesting data on quantitative,
qualitative and boundary issues. All the agencies were contacted individually and meetings arranged
as available. All data received was entered into the Ventura LAFCo database. The database will be
used for subsequent service reviews, sphere of influence studies and other Ventura LAFCo studies
and analysis.
No significant infrastructure issues were identified for either of the Drainage Districts. Increasing
run-off from urbanizing areas and associated impervious surfaces can overwhelm the existing
drainage facilities of the Districts which were sized for draining the agricultural land only. Due to on-
going lack of coordination between the City of Oxnard and each District, areas have been annexed
Final 1 February 16, 2005
I. Executive Summary
into the City of Oxnard and developed, but remain within the boundaries of each District even though
District services are no longer necessary or being provided. As a result of this lack of coordination
both Districts should now pursue detachment of developed territory within their respective boundaries
and pay for all costs relating to detachments. In the future, the Districts and the City should
coordinate changes in governmental boundaries in a timelier manner as development occurs.
There is the potential for future land use conflicts between development inside the City of Oxnard’s
CURB (City Urban Restriction Boundary) line and adjacent existing agricultural uses within the
Districts. As areas develop, adequate buffers should be provided between the urban uses in the City
and agricultural uses remaining in the Districts.
No significant financing constraints were noted for either District. However as lands annex to the
City of Oxnard for development and detach from the Districts, the financial burden on the remaining
District landowners will increase. The Districts have discussed a potential consolidation or
reorganization between the agencies in the past and the subject should be re-examined as detachments
continue.
In addition to further examination of potential consolidation or reorganization by each District for
government structure options, several changes in the spheres for each District have been noted. These
are areas of existing urban development that have not been detached from the District, areas that are
inside the City of Oxnard CURB that should be removed from the sphere of each District and areas
where urban development is not expected and the sphere of the District should be amended.
No significant issues in management efficiency, local accountability and governance, shared facilities
or rate restructuring were noted.
February 16, 2005 2 Final
II. Service Review Process
IIII.. SSEERRVVIICCEE RREEVVIIEEWW PPRROOCCEESSSS
The Ventura LAFCo’s municipal service review process is being completed in phases. The
Commission completed the first round of municipal service review reports, which addressed water
and wastewater services, in January of 2004. The second phase includes the following services and
related service providers:
SERVICES AGENCIES
• Casitas Municipal Water District*
• Conejo Recreation and Park District
• County Service Area (CSA) #33
Park/Recreation
• Pleasant Valley Recreation and Park District
• Rancho Simi Recreation and Park District
• United Water Conservation District*
• Bardsdale Public Cemetery District
Cemetery • Piru Public Cemetery District
• El Rancho Simi Cemetery District
• Ventura Regional Sanitation District*
Solid Waste
• Channel Islands Beach Community Services District*
• Oxnard Drainage District No. 1
Drainage
• Oxnard Drainage District No. 2
• County Service Area (CSA) # 3
Roads • County Service Area (CSA) # 4
• County Service Area (CSA) # 14
Community Services • Bell Canyon Community Services District
* Also included in the Water/Wastewater Service Review report
The process used to prepare the water and wastewater service review report was also used for the
agencies listed above. A four-part questionnaire was distributed to all 17 agencies. The first part
collected general information about the agency (contact information, governing body, financial, etc.),
the second part asked for service specific data, the third part included a both questions and a map
relating to boundary issues and the fourth part was a signature page. The questionnaire was designed
to ensure the efficient transfer of data into the LAFCo database.
A meet and confer process was offered to all agencies and included interviews and email/phone
conversations. Of the 17 agencies, 15 returned questionnaires although the format, quantity and
quality of information returned varied significantly. Agencies which had previously completed the
water/wastewater service review questionnaire were asked to just complete those portions of the
questionnaires applicable to the service addressed in current service review.
All information collected from the questionnaires was entered into the Ventura LAFCo database
which has been improved to increase its efficiency and facilitate future LAFCo reports.
Final 3 February 16, 2005
III. Ventura County Drainage Districts
IIIIII.. VVEENNTTUURRAA CCOOUUNNTTYY DDRRAAIINNAAGGEE DDIISSTTRRIICCTTSS
A. BACKGROUND
Oxnard Drainage District No. 1 was formed in 1918, and Oxnard Drainage District No. 2 was formed
in 1926, pursuant to the Drainage District Act of 1903. There was an Oxnard Drainage District No. 3
formed in 1937 under this same Act, but because most of the territory in its boundaries had been
developed for urban uses that District was dissolved and its remaining agricultural lands were merged
into Oxnard Drainage District No. 2 in 1984.
The Drainage District Act of 1903 provides for the organization and governmental structure of special
districts whose sole purpose is to drain agricultural lands. The Act does not grant authority to perform
other services, including any urban service functions. Districts formed under the Act are governed by
a three member board of directors elected from the landowners of the district and, therefore, are
considered as landowner-voter, independent districts. The Act provides for these types of districts to
issue bonds for capital improvements and to use eminent domain as necessary for public purposes.
The Act also provides for the districts to levy taxes, but this ability was limited by the passage of
Proposition 13 and Proposition 218.
An unusual restriction in the Drainage District Act of 1903 is that only lands that are susceptible to
one general mode of drainage by the same system of works may be included within a district. The
districts are formed along topographic lines that allow the drainage of agricultural lines within a
common system of drainage. Lands that cannot be served by the common system of drainage may not
be included within the district.
At the time of the formation of the Oxnard Drainage Districts, the water table in the Oxnard Plain was
sufficiently high to prevent agricultural development in many areas. Thus, a system of lowering the
water table was necessary in order that the surface lands could be tilled. The water table was lowered
by the installation of clay or tile pipe approximately six to ten feet below the surface of the ground. A
small space was allowed between each joint of the pipe to allow the water above the level of the pipe
to seep into the pipe and thus be carried to a drainage ditch or other drains away from the agricultural
lands. By this means thousands of acres of land were made suitable for agriculture in the Oxnard
Plain.
Shortly after the formation of each of the Oxnard Drainage Districts bonds were issued to construct
the necessary drainage facilities. All of these bonds have been redeemed, with the last bond payment
being made in 1958. The current activities of both Districts consist primarily of conducting the day-
to-day business activities, including maintenance of facilities. Little maintenance is required for the
underground tile drains, but on-going maintenance is required for the open ditches. The Boards of
Directors perform largely caretaker functions. The Districts have no staff and District operations are
performed by contract.
Over time portions of the territory within the boundaries of the Drainage Districts have been
developed for urban uses. The transition of properties from agriculture use to urban use has a
continuing impact on the operations of the Drainage Districts. As lands are developed for urban uses,
agricultural drainage facilities are no longer necessary and the installation of more sophisticated
systems of surface drainage is required. An on-going issue for the Districts and the neighboring City
of Oxnard is to ensure that developing lands are detached from the Districts and that urban uses do
not impact District facilities or the viability of adjoining agriculture.
February 16, 2005 4 Final
III. Ventura County Drainage Districts
B. AGENCY PROFILES
Profiles of Oxnard Drainage District No. 1 and Oxnard Drainage District No. 2 follow along with
Map 1 which shows the location, current boundaries and sphere of influence for each agency.
OXNARD DRAINAGE DISTRICT No. 1
Contact: William B. Smith, Ferguson Case Orr Paterson & Cunningham LLP
Mailing Address: 1050 S. Kimball Road, Ventura, CA 93004
Site Address: Same
Phone Number: 805-659-6800
Fax Number: 805-659-6818
Email/Website wsmith@fcopc.com
Types of Services: Agricultural and subsurface drainage
Population Served: NP
Size of Service Area (sq miles): 3.1
Date of Formation December 3, 1918
STAFF AND FACILITIES
Number of Paid Staff 0 (all work done by contractors)
FINANCIAL INFORMATION
Budget: (FY 2003-2004) Revenues: Expenses
$38,061 $38,061
% Revenue Property Taxes: 8%
% Revenue Assessments 91%
NP – Not Provided
Final 5 February 16, 2005
III. Ventura County Drainage Districts
OXNARD DRAINAGE DISTRICT No. 2
Contact: John Orr, Ferguson Case Orr Paterson & Cunningham LLP
Mailing Address: 1050 S. Kimbal Road, Ventura CA 93004
Site Address: Same
Phone Number: 805-659-6800
Fax Number: 805-659-6818
Email/Website jorr@fcopc.com
Types of Services: Agricultural and subsurface drainage
Population Served: 200
Size of Service Area (sq miles): 12.5
Date of Formation 1926
STAFF AND FACILITIES
Number of Paid Staff 0 (all work done by contractors)
FINANCIAL INFORMATION
Budget: (FY 2003-2004) Revenues: Expenses
$110,764* $126,415*
% Revenue Property Taxes: 0%
% Revenue Assessments 92%
* Oxnard Drainage District No. 2 was required to relocate its drainage facilities as a result of the Rice
Road/Highway 1 construction. The imbalance in the budgets, starting in FY 2000-01 and ending in FY
2003-04, is a result of that work which was paid for by Caltrans.
February 16, 2005 6 Final
III. Ventura County Drainage Districts
Map 1:
Final 7 February 16, 2005
III. Ventura County Drainage Districts
C. GROWTH AND POPULATION
The area included within both Drainage Districts is used primarily for agricultural purposes and no
significant changes in the population are expected.
Growth patterns are also not expected to change significantly for either Drainage District. A majority
of both Districts’ territory is located outside the City of Oxnard’s City Urban Restriction Boundary
(CURB), adopted as a part of the Oxnard Save Open Space and Agricultural Resources (SOAR)
Ordinance; it is designated for agricultural use by the County of Ventura’s General Plan and, thus, is
subject to the County’s SOAR Ordinance. The City of Oxnard’s SOAR Ordinance and CURB is in
effect until 2020 and, with limited exemptions, cannot be changed except by a majority vote of the
voters in Oxnard. The County of Ventura’s SOAR Ordinance is also in effect until 2020 and lands
designated for agricultural or open space uses by the County’s General Plan cannot, with limited
exceptions, be changed to other designations without a majority vote of voters in the County.
Given the restrictions of both the City and County SOAR ordinances the potential for urban growth to
extend into most of the service areas of the Drainage Districts is considered limited. However, there
are discrepancies between the boundaries and spheres of influence of each District and the Oxnard
CURB. These discrepancies are addressed in Section F under Government Structure Options.
D. INFRASTRUCTURE NEEDS AND DEFICIENCIES
Ventura County's farmland contributes approximately $4 billion to the local economy annually, and
as a result of the voter approved SOAR Ordinances, agriculture is not viewed as an interim land use
as it is in other areas of California.
However, continued residential development adjacent to farmland can have negative impacts for
agriculture’s long-term viability if restraints are placed on the grower as the result of complaints.
Both Districts include relatively large blocks of farmland that can continue as viable agricultural
operations if future land use conflicts are minimized by the City of Oxnard. Buffers and the strict
application of zoning controls are necessary between agriculture and urban uses. Barriers, such as
rivers, major roads and freeways, drainage channels and airports are natural and easily recognizable
boundaries between agricultural and urban uses. For example, the Edison Canal on the western side
of the Oxnard Drainage District No. 1 provides a recognizable boundary between the agricultural land
and other land uses. Where such types of buffers do not exist, the responsibility for a buffer must rest
with the new urban use, not with the pre-existing agricultural use.
Another impact on both Districts is the increase in surface drainage from urban development on
District facilities. The facilities of both Districts were not sized to handle increased run-off from
urban development and associated impervious surfaces. When drainage systems for urban uses are
not properly sized or when such systems tie into drainage systems that are the responsibility of the
Districts, the Districts should take a more proactive role in the environmental review of urban projects
and other entitlement processes to protect their systems. Also, as development occurs, it is necessary
for the City of Oxnard, Ventura County and other agencies to ensure that urban run-off does not
negatively impact the existing facilities of the Districts.
No other significant issues were noted for infrastructure specific to the Districts. The Board of each
District annually reviews the projects necessary for the continuation of agriculture and prepares the
budget and annual assessments (based on a per parcel amount) needed to fund the necessary
infrastructure. While neither agency has a formal Master Plan, the small size and number of
landowners make such documents superfluous.
February 16, 2005 8 Final
III. Ventura County Drainage Districts
E. FINANCING CONSTRAINTS AND OPPORTUNITIES, COST AVOIDANCE
OPPORTUNITIES AND RATE RESTRUCTURING
Both Drainage Districts are funded through assessments on individual landowners. Oxnard Drainage
District No. 1 receives some property tax revenue; however this amounts to less than 1% of the total
budget. Fees are set annually by dividing the cost of needed infrastructure maintenance and repairs
by the number of parcels in the District.
When urban development of territory in either District occurs, the effect is to reduce both the amount
of farmland in the County and the special assessment revenue available to each District. Lands
developed for urban uses reduce the service area of each District when the agricultural sub-surface
facilities are removed. However, each District must still maintain its master drainage facilities and
the reduction in farmland results in an increased financial burden on the remaining farmlands in each
District. This impacts the viability of the remaining farmland overall and can impact the future
financing capacity of each District.
The State’s budget act of 2004 includes significant changes in how local revenues are allocated. For
FYs 2004-2005 and 2005-2006, special districts throughout the state are required to contribute an
aggregate of $350 million each year to the Educational Revenue Augmentation Fund (ERAF). This is
paid directly out of the district’s tax increment. The State provided the Ventura County Auditor-
Controller with the following estimated FY 2004-2005 contributions from the two Drainage Districts:
• Oxnard Drainage District No. 1: $3,723.40
• Oxnard Drainage District No. 2: $10,407.10
The State estimates provided to the Auditor-Controller were based on information filed with the State
by the Districts. Somewhere in this reporting, an error occurred for Oxnard Drainage District No. 2.
Because Oxnard Drainage District No. 2 does not receive any property tax revenues or any revenues
that the Auditor-Controller can collect under the ERAF formula, ERAF will have no impact during
the next two fiscal years on this District. According to the Auditor-Controller this means that the State
ERAF fund will be under funded by a corresponding amount from Ventura County.
Oxnard Drainage District No. 1 does receive a small amount of property tax ($13,647.54 for FY
2004-2005 according to the Auditor-Controller) and, thus, will be affected by ERAF for the amount
indicated. The District can address this impact through the use of reserves, deferring maintenance
expenditures, or increasing assessments in following years. However, in the near term the loss of this
revenue over the next two fiscal years can be considered a financing constraint.
The landowners in Drainage District No. 1 maximize cost avoidance opportunities by performing
some of the work themselves, by using independent contractors rather than hiring staff and by having
the City of Oxnard maintain some district facilities.
Final 9 February 16, 2005
III. Ventura County Drainage Districts
TTAABBLLEE IIIIII--11
OOxxnnaarrdd DDrraaiinnaaggee DDiissttrriicctt NNoo.. 11 FFiinnaanncciiaall DDaattaa
GENERAL FUND FY 02-031 FY 01-022 FY 00-013
Total Operating Revenue $43,535 $40,700 $39,274
Total Operating Expenses $38,229 $35,380 $31,409
Operating Income (Loss) $14,333 $5,320 $7,865
Fund Balance, End of Year $5,306 $42,728 $37,408
Oxnard Drainage District No. 1 appears to be in stable condition although its small size makes
reaching economies of scale difficult.
TTAABBLLEE IIIIII--22
OOxxnnaarrdd DDrraaiinnaaggee DDiissttrriicctt NNoo.. 22 FFiinnaanncciiaall DDaattaa
GENERAL FUND FY 02-034 FY 01-025 FY 00-016
Total Operating Revenue $102,625 $110,924 $492,037*
Total Operating Expenses $123,962 $283,920 $456,708
Operating Income (Loss) $21,337 ($172,996)* $35,329
Fund Balance, End of Year $297,528
* Rice Road/State Highway 1 project required the District to relocate its lines within the project area. Caltrans paid the District funds to
accomplish this work in year 2001 and the District completed the expenditure in 2002. Accordingly, the budget appears unbalanced
when, in fact, it is just a question of the timing of one time revenues (from Caltrans) and corresponding district expenditures.
Oxnard Drainage District No. 2 appears to have a stable financial situation and no significant issues
were noted.
F. OPPORTUNITIES FOR SHARED FACILITIES, EVALUATION OF
MANAGEMENT EFFICIENCIES AND GOVERNMENT STRUCTURE OPTIONS
Some facilities of Oxnard Drainage District No. 1 are maintained by the City of Oxnard which
increases the efficiency of the operations of the agency.
Both agencies use the same law firm and have periodically discussed some form of consolidation
between the two agencies to reduce costs and reach economies of scale. As additional territory is
developed and detached from the agencies, the need to more closely examine the possibility of some
form of shared operations may be necessary to ensure an adequate revenue base.
1 Provided by District on MSR questionnaire.
2 Independent Auditor's Report, Ferguson, Case, Orr, Paterson & Cunningham, LLP, November 15, 2002.
3 Independent Auditor's Report, Ferguson, Case, Orr, Paterson & Cunningham, LLP, November 15, 2002.
4 Provided by District on MSR questionnaire.
5 California State Controller's Data.
6 Independent Auditor's Report, Vance, Thrift and Biller LLP, February 6, 2002.
February 16, 2005 10 Final
III. Ventura County Drainage Districts
Another measure of management efficiencies was the presence and opinion of audits. Table III-3
summarizes the audit status for both agencies:
TTAABBLLEE IIIIII--33
DDrraaiinnaaggee DDiissttrriicctt AAuuddiittss
LAST AUDIT
SUBMITTED NEXT AUDIT AUDIT
DISTRICT AUDIT CYCLE
TO COUNTY DUE COMMENTS
AUDITOR
Oxnard Drainage District No. 1 2 yr. June '02 Jun '04 Qualified
Oxnard Drainage District No. 2 2 yr. June '03 Jun '05 Qualified
The qualifications of the audits are not considered significant.
GGoovveerrnnmmeenntt SSttrruuccttuurree OOppttiioonnss
As noted, increased urbanization has steadily reduced the amount of territory within each of the two
Oxnard Drainage Districts. This trend is expected to continue, especially for any lands within the
Oxnard CURB. As the Districts continue to shrink in size, their ability to function as independent
units of local government will lessen. The two Districts have discussed consolidation of the agencies
in the past. Both agencies are formed under the same enabling legislation and provide similar
services. They share similar forms of assessments and share staff (same law firm). Some economies
of scale might be reached through a consolidation of the two agencies or through a functional
consolidation of the agency functions. A possible constraint may be the provision in the Drainage
District Act of 1903 that may require a common system of drainage. It is recommended that both
Districts again review the potential for consolidation of the agencies with LAFCo.
DDiissttrriicctt BBoouunnddaarriieess aanndd SSpphheerreess ooff IInnfflluueennccee
A governmental structure issue for both Districts has resulted from poor coordination between the
City of Oxnard and the Districts over the timing for detaching territory from the Districts as
development occurs. This poor coordination and timing problem is well documented in LAFCo
records for at least the last 30 years.
Ideally, when territory to be developed is annexed to the City of Oxnard it would simultaneously be
detached from the respective Drainage District (i.e. a LAFCo reorganization action). However, this
has been previously discussed by LAFCo and the Districts and rejected as a course of action. The
reason is that after an annexation to the City of Oxnard is approved, there is often a lag time of
months to a year or more before actual development occurs. During this lag time period the territory
involved may continue in agricultural use and utilize a District’s sub-surface drainage facilities. In
other words the cessation of the agricultural use does not occur with annexation to the City of
Oxnard. Given this fact, the Districts and LAFCo have previously agreed that the Districts would
coordinate with the City of Oxnard and file with LAFCo for detachment of the lands to be developed
as urban development occurs. This process is more expensive for the Districts but, if properly timed,
it provides for maximum use of District facilities.
Unfortunately, the Districts’ actions to request detachment upon urbanization are not always
coordinated or timed to coincide with actual development. The result has been that there are areas
Final 11 February 16, 2005
III. Ventura County Drainage Districts
remaining in the boundaries of each District that have been developed in the City of Oxnard and
where the Districts no longer provide services. In several cases these developed lands have been
subdivided into many parcels and in at least some cases are now inhabited (i.e. contain twelve or
more registered voters). This means that the Districts will not necessarily be able to obtain the
consent of all the affected property owners and that the process for detachment with LAFCo will
require protest hearings and significantly more time and expense. Also, the Districts may not be able
to pass on the costs of detachment to the affected property owners and this will result in an additional
expense burden for the Districts. It is recommended that LAFCo, in conjunction with the Districts
and the City of Oxnard, re-examine policies about not requiring detachment from the respective
Drainage District whenever a reorganization with the City of Oxnard affects territory in a Drainage
District boundary. One possible solution is that areas annexed to the City could be concurrently
detached from the District but the recordation could occur when actual development occurs and
agricultural uses cease.
In addition to the issue of boundaries for each of the Districts, it has been more than twenty years
since the spheres of influence for each District were updated. The current spheres of influence for
both Districts were adopted in 1982 and were based on the City of Oxnard’s General Plan and
anticipated urban development. Since that time the City of Oxnard has adopted a new General Plan
and both the Oxnard and County SOAR ordinances have been approved. There are now several areas
for each District where the sphere of influence should be updated to reflect the Oxnard CURB.
Territory within the Oxnard CURB can be developed in the future and should be outside the sphere of
influence boundary of each of the Districts. Such an update will alleviate the need for the Districts to
seek amendment of their respective spheres of influence in the future, but will have no impact on
District services to the lands remaining in the boundaries of each District.
Areas that should be detached from each District and areas where the sphere of influence should be
updated to either remove or to consider adding territory based on the Oxnard CURB and/or the
County SOAR ordinance, should be considered as special study areas as a part of LAFCo’s sphere of
influence updates. These special study areas are described in the following Table III-4 and the related
Map 2 for Oxnard Drainage District No. 1 and Table III-5 and related Map 3 for Oxnard Drainage
District No. 2.
February 16, 2005 12 Final
III. Ventura County Drainage Districts
This Page Intentionally Left Blank
Final 13 February 16, 2005
III. Ventura County Drainage Districts
TTAABBLLEE IIIIII--44
OOxxnnaarrdd DDrraaiinnaaggee DDiissttrriicctt NNoo.. 11 SSppeecciiaall SSttuuddyy AArreeaass ((MMaapp 22))
SPECIAL STUDY
DESCRIPTION
AREA #
Approximately 142 acres west of Victoria Avenue between Wooley Road and
Hemlock Street – This area is currently being developed and is no longer in
1 agricultural use. Drainage District No. 1 should promptly seek the consent of the
current property owner and file with LAFCo to have this area detached before the
area is sold to multiple owners.
Approximately 16 acres of the former Edison Canal southerly of Wooley Road –
This portion of the former Edison Canal is entirely outside the Oxnard CURB and
2
outside the existing sphere of influence. The District should consider detaching this
portion of the Canal from its boundaries.
Approximately 40 acres of the former Edison Canal from north of W. Fifth Street to
Wooley Road – This portion of the Canal is now entirely within the sphere of
3 influence. LAFCo should consider changing the sphere boundary to the easterly
side of the canal. The canal serves as a logical buffer for areas to the west that are
within the Oxnard CURB
Approximately 560 acres south of Gonzales Road and east of Harbor Boulevard – In
consultation with the District, LAFCo should consider adding this large area to the
sphere of influence. The area is outside the Oxnard CURB and will remain in
4
agricultural use for the foreseeable future. If the agricultural lands in this area could
benefit from extension of the District’s services, the area could be annexed to the
District.
Approximately 13 acres south of Oxnard High School on Gonzales Road – This
property is developed and is part of Oxnard High School. The District should seek
5
the consent of Oxnard Union High School District and file with LAFCo to have this
area detached.
Approximately 216 acres east of Oxnard Blvd. south of Gonzales Road – This area
has been almost entirely developed, including Pacifica High School and single-
family homes. The District should file with LAFCo to have all the developed
6 portions of this area detached. Because the City of Oxnard and the District failed to
coordinate the detachment of this area prior to development, detachment will be
subject to protest proceedings with LAFCo and will be more expensive for the
District.
Approximately 12 acres south of W. Fifth Street and along Monte Carlo Drive and
Naples Drive – The District should file with LAFCo to have this area detached as it
has been developed with single family homes. Because the City of Oxnard and the
7
District failed to coordinate the detachment of this area prior to development,
detachment will be subject to protest proceedings with LAFCo and will be more
expensive for the District.
Approximately 17 acres at the north easterly corner of W. Fifth Street and Victoria
Avenue - The District should file with LAFCo to have this area detached as it has
been developed with a commercial center. Because the City of Oxnard and the
8
District failed to coordinate the detachment of this area prior to development,
detachment will likely be subject to protest proceedings with LAFCo and will be
more expensive for the District
Approximately 59 acres west of Victoria Avenue and north of W. Fifth Street –
LAFCo should consider removing this area from the District’s sphere of influence.
9
While it is currently used for agricultural purposes it is within the Oxnard CURB
and development is possible.
February 16, 2005 14 Final
III. Ventura County Drainage Districts
Map 2:
Final 15 February 16, 2005
III. Ventura County Drainage Districts
TTAABBLLEE IIIIII--55
OOxxnnaarrdd DDrraaiinnaaggee DDiissttrriicctt NNoo.. 22 SSppeecciiaall SSttuuddyy AArreeaass ((MMaapp 33))
SPECIAL STUDY
DESCRIPTION
AREA #
1 Approximately 6.5 acres along Rose Avenue between Wooley Road and Emerson
Avenue – LAFCo should consider updating the District’s sphere of influence to
coincide with the Oxnard CURB in this area.
2 Approximately 311 acres east of Rose Avenue between E. Fifth Street and Wooley
Road - In consultation with the District, LAFCo should consider adding this large
area to the sphere of influence. The area is outside the Oxnard CURB and will
remain in agricultural use for the foreseeable future. If the agricultural lands in this
area could benefit from extension of the District’s services, the area could be
annexed to the District.
3 Approximately 424 acres between Rice Avenue on the east and the Oxnard CURB
on the west and north of Sturgis Road - The District should file with LAFCo to have
this area detached as it has been almost entirely developed with industrial uses.
Because the City of Oxnard and the District failed to coordinate the detachment of
this area prior to development, detachment will likely be subject to protest
proceedings with LAFCo and will be more expensive for the District.
February 16, 2005 16 Final
III. Ventura County Drainage Districts
Map 3:
Final 17 February 16, 2005
III. Ventura County Drainage Districts
G. LOCAL ACCOUNTABILITY AND GOVERNANCE
The board members of each Drainage District, their terms of office and compensation are shown in
the following tables:
TTAABBLLEE IIIIII--66
OOxxnnaarrdd DDrraaiinnaaggee DDiissttrriicctt NNoo.. 11 –– BBooaarrdd MMeemmbbeerrss aanndd TTeerrmmss
BOARD MEMBER TITLE TERM OF OFFICE COMPENSATION
John Dullam President 2007 $0
Vice President/Board
Frank Hiji 2005 $0
Member
Thomas McGrath Board Member 2007 $0
Meetings of the Oxnard Drainage District No. 1 are held quarterly (January, April, July and October)
on the last Tuesday of the month starting at 4:00 pm at 1050 South Kimbal Road in Ventura.
Notification of the public is through posting at the meeting location and published in the newspaper.
The Board of Directors receives no compensation. Reviews of the laws applicable to Board members
(Brown Act, Fair Political Practices Commissions and Public Disclosure Act) are held regularly. The
last audit was completed in July of 2003.
TTAABBLLEE IIIIII--77
OOxxnnaarrdd DDrraaiinnaaggee DDiissttrriicctt NNoo..22 –– BBooaarrdd MMeemmbbeerrss aanndd TTeerrmmss
BOARD MEMBER TITLE TERM OF OFFICE COMPENSATION
James Naumann President 2005 $0
Jesse DeBusschere Director 2007 $0
Jurgen Gramckow Director 2007 $0
Meetings of the Oxnard Drainage District No. 2 are held quarterly (January, April, July and
September) on the last Tuesday of the month starting at 11:00 am at 1050 South Kimbal Road in
Ventura. Notification of the public is through posting at the meeting location and published in the
newspaper. The Board of Directors receives no compensation. Reviews of the laws applicable to
Board members (Brown Act, Fair Political Practices Commissions and Public Disclosure Act) are
held regularly. The last audit was completed in April of 2004.
Generally no significant issues regarding local accountability and governance were noted for either
Drainage Districts. The governing boards of the Districts are elected by the landowners and appear to
be as locally accountable as possible. Neither of the Districts has a website but with the structure of
the Districts, it is not needed to ensure local accountability.
.
February 16, 2005 18 Final
IV. Determinations
IIVV.. DDEETTEERRMMIINNAATTIIOONNSS
Determinations are based on data provided by the districts.
A. OXNARD DRAINAGE DISTRICT NO. 1
• Infrastructure needs or deficiencies
1. That the Oxnard Drainage District No. 1 bases its assessment of maintenance of
drainage facilities on annual evaluations by landowners.
2. That encroaching urban development can impact the services of the Oxnard Drainage
District No. 1.
3. That the Oxnard Drainage District No. 1 currently provides adequate levels of
services for its customers.
• Growth and population projections for the affected area
1. That growth in the Oxnard Drainage District No. 1 is limited due to both the City of
Oxnard and County of Ventura SOAR Ordinances, and the continued viability of
agricultural operations.
• Financing constraints and opportunities
1. That the Oxnard Drainage District No. 1 prepares an annual budget based on
estimated maintenance needs and on the assessment of individual landowners.
2. That continued detachments of land from the Oxnard Drainage District No. 1 may
negatively impact the financial resources of the District and jeopardize its ability to
continue operations.
• Cost avoidance opportunities
1. That the Oxnard Drainage District No. 1 uses cost sharing programs with other
agencies wherever possible.
2. That the Oxnard Drainage District No. 1 uses contractors for services when shown to
be cost effective.
• Opportunities for rate restructuring
1. That the rates and fees of the Oxnard Drainage District No. 1 are set annually.
• Opportunities for shared facilities
1. That the Oxnard Drainage District No. 1 collaborates with the City of Oxnard and
other agencies about facilities.
• Government structure options, including advantages and disadvantages of the
consolidation or reorganization of service providers
1. That the Oxnard Drainage District No. 1 should reexamine the potential benefits of
consolidation with Oxnard Drainage District No. 2.
2. That the Oxnard Drainage District No. 1 and the City of Oxnard should collaborate
more effectively about the timing of development of territory in the District’s
boundaries and the related need to detach such territory from the District’s
boundaries.
3. That LAFCo, in conjunction with the Oxnard Drainage District No. 1 and the City of
Oxnard, should re-examine policies about not requiring detachment from the District
whenever a reorganization with the City of Oxnard affects territory in the District’s
boundary.
Final 19 February 16, 2005
IV. Determinations
4. That the Oxnard Drainage District No. 1 should promptly file with LAFCo for the
detachment of all territory within the District’s boundaries that has been developed or
that is no longer benefiting from District services.
5. That LAFCo, in conjunction with the Oxnard Drainage District No. 1, should
consider updating the District’s sphere of influence to include territory adjacent to
existing District boundaries that is located outside the Oxnard CURB, that is likely to
remain in agricultural use for the foreseeable future, and that could potentially benefit
from the extension of District facilities.
• Evaluation of management efficiencies
1. That the current management structure of the Oxnard Drainage District No. 1 is
adequate to serve the present and future needs of the agency.
• Local accountability and governance
1. That the Oxnard Drainage District No. 1 is locally accountable through adherence to
applicable government code sections, open and accessible meetings, and
dissemination of information and encouragement of participation in their process.
February 16, 2005 20 Final
IV. Determinations
B. OXNARD DRAINAGE DISTRICT NO. 2
• Infrastructure needs or deficiencies
1. That the Oxnard Drainage District No. 2 bases its assessment of maintenance of
drainage facilities on annual evaluations by landowners.
2. That encroaching urban development can impact the services of the Oxnard Drainage
District No. 2.
3. That the Oxnard Drainage District No. 2 currently provides adequate levels of
services for its customers.
• Growth and population projections for the affected area
1. That growth in the Oxnard Drainage District No. 2 is limited due to both the City of
Oxnard and County of Ventura SOAR Ordinances, and the continued viability of
agricultural operations.
• Financing constraints and opportunities
1. That the Oxnard Drainage District No. 2 prepares an annual budget based on
estimated maintenance needs and on the assessment of individual landowners.
2. That continued detachments of land from the agency may negatively impact the
financial resources of the District and jeopardize its ability to continue operations.
• Cost avoidance opportunities
1. That the Oxnard Drainage District No. 2 uses cost sharing programs with other
agencies wherever possible such as the watershed plan.
2. That the Oxnard Drainage District No. 2 uses contractors for services when shown to
be cost effective.
• Opportunities for rate restructuring
1. That the rates and fees of the Oxnard Drainage District No. 2 are set annually.
• Opportunities for shared facilities
1. That the Oxnard Drainage District No. 2 collaborates with the City of Oxnard and
other agencies about facilities.
• Government structure options, including advantages and disadvantages of the
consolidation or reorganization of service providers
1. That the Oxnard Drainage District No. 2 should reexamine the potential benefits of
consolidation with Oxnard Drainage District No. 1.
2. That the Oxnard Drainage District No. 2 and the City of Oxnard should collaborate
more effectively about the timing of development of territory in the District’s
boundaries and the related need to detach such territory from the District’s
boundaries.
3. That LAFCo, in conjunction with the Oxnard Drainage District No. 2 and the City of
Oxnard, should re-examine policies about not requiring detachment from the District
whenever a reorganization with the City of Oxnard affects territory in the District’s
boundary.
4. That the Oxnard Drainage District No. 2 should file with LAFCo for the detachment
of all territory within the District’s boundaries that has been developed or that is no
longer benefiting from District services.
5. That LAFCo, in conjunction with the Oxnard Drainage District No. 2, should
consider updating the District’s sphere of influence to include territory adjacent to
Final 21 February 16, 2005
IV. Determinations
existing District boundaries that is located outside the Oxnard CURB, that is likely to
remain in agricultural use for the foreseeable future, and that could potentially benefit
from the extension of District facilities.
• Evaluation of management efficiencies
1. That the current management structure of the Oxnard Drainage District No. 2 is
adequate to serve the present and future needs of the agency.
• Local accountability and governance
1. That the Oxnard Drainage District No. 2 is locally accountable through adherence to
applicable government code sections, open and accessible meetings, and
dissemination of information and encouragement of participation in their process.
February 16, 2005 22 Final