LAFCO
VCWD 19 MSR 2022 05 18
Read the report at Local Agency Formation Commissions ↗
Ventura Local Agency Formation Commission
Ventura County Waterworks
District No. 19
Municipal Service Review
Prepared By:
Ventura Local Agency Formation Commission
801 S. Victoria Avenue, Suite 301
Ventura, CA 93003
Accepted by the Commission on May 18, 2022
Table of Contents
Introduction .............................................................................................................................................. 1
Maps .......................................................................................................................................................... 3
Profile ........................................................................................................................................................ 4
Growth and Population Projections .......................................................................................................... 6
Review of Municipal Services .................................................................................................................... 7
Sphere of Influence ................................................................................................................................. 12
Written Determinations .......................................................................................................................... 13
Introduction
Purpose of the Municipal Service Review
Local Agency Formation Commissions (LAFCos) exist in each county in California and were
formed for the purpose of administering state law and local policies relating to the
establishment and revision of local government boundaries. According to the Cortese-Knox-
Hertzberg Local Government Reorganization Act of 2000 (California Government Code § 56000
et seq.), LAFCo’s purposes are to:
• discourage urban sprawl;
• preserve open space and prime agricultural land;
• ensure efficient provision of government services; and
• encourage the orderly formation and development of local agencies.
To achieve these purposes, LAFCos are responsible for coordinating logical and timely changes
in local government boundaries (such as annexations), conducting special studies that identify
ways to reorganize and streamline governmental structure, and determining a sphere of
influence for each city and special district over which they have authority.
A sphere of influence is a plan for the probable physical boundaries and service area of a local
agency, as determined by LAFCo (Government Code § 56076). Beginning in 2001, each LAFCo
was required to review, and as necessary, update the sphere of each city and special district on
or before January 1, 2008, and every five years thereafter (Government Code § 56425(g)).
Government Code § 56430(a) provides that in order to determine or update a sphere of
influence, LAFCo shall prepare a Municipal Service Review (MSR) and make written
determinations relating to the following seven factors:
1. Growth and population projections for the affected area.
2. The location and characteristics of any disadvantaged unincorporated communities
within or contiguous to the sphere of influence.
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies including needs or deficiencies related to sewers,
municipal and industrial water, and structural fire protection in any disadvantaged,
unincorporated communities within or contiguous to the sphere of influence.
4. Financial ability of agencies to provide services.
5. Status of, and opportunities for, shared facilities.
6. Accountability for community service needs, including governmental structure and
operational efficiencies.
7. Any other matter related to effective or efficient service delivery, as required by
Commission policy.
MSRs are not prepared for counties, but are prepared for special districts including those
governed by a county Board of Supervisors. Additionally, while LAFCos are authorized to
prepare studies relating to their role as boundary agencies, they have no investigative
authority.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 1 of 17
LAFCo staff prepared this MSR for the Ventura County Waterworks District No. 19 (District or
VCWD 19) using information obtained from multiple sources, including, but not limited to:
• MSR Questionnaire: A questionnaire supplied by LAFCo elicited general information
about the District (e.g., contact information, governing body, financial information), as
well as service-specific data;
• Budget: The adopted budget provided information regarding services and funding
levels;
• General Plan: Ventura County General Plan provided information regarding land use,
populations, and service levels;
• District Documents: Various District documents provided supplementary information
relating to service provision;
• Historical MSR: The 2004 MSR provided certain data that remain relevant and accurate
for inclusion in the current MSR;
• District Website: The District’s website provided supplementary and clarifying
information; and
• District Staff: District staff provided supplementary and clarifying information.
Organization of the MSR
This report is organized into several sections, as follows:
• Maps: A general location map and the official LAFCo map of the District;
• Profile: Summary profile of information about the District, including contact
information, governing body, summary financial information, and staffing levels;
• Growth and Population Projections: Details of past, current, and projected population
for the District;
• Review of Municipal Services: Discussion of the municipal services that the District
provides;
• Sphere of Influence: Discussion of the existing sphere of influence of the District and
potential modifications to the sphere; and
• Written Determinations: Recommended determinations for each of the seven
mandatory factors for the District.
The Commission’s acceptance of the MSR and adoption of written determinations will be
memorialized through the adoption of a resolution that addresses each of the seven mandatory
factors based on the Written Determinations section of the MSR.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 2 of 17
Maps
Figure 1: Location Map for Ventura County Waterworks District No. 19
Figure 2: Official LAFCo Map
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 3 of 17
Profile
Ventura County Waterworks District No. 19, a dependent district of the County of Ventura, was
formed on November 4, 1980. It provides potable water service, including all related
administrative functions, to customers in the unincorporated community of Somis and
surrounding areas, generally north of the City of Camarillo. VCWD 19 provides services through
the Water and Sanitation Department of the Ventura County Public Works Agency (VCPWA).
The mission of the Water and Sanitation Department of the VCPWA is provided as follows:
To deliver efficient, responsive and cost effective public works services that protect and
enhance the safety, health and quality of life in Ventura County.
Contact Information
District Manager Joseph Pope
District Office 6767 Spring Road, Moorpark, CA 93020
Mailing Address P.O. Box 250, Moorpark, CA 93020-0250
Phone Number (805) 378-3000
Website pwa.vcpublicworks.org/wsd
E-mail Address joseph.pope@ventura.org
Governance Information
Formation Date November 4, 1980
Legal Authority Water Code Section 55000 (County Waterworks District Law)
Type of District Dependent
Board of Directors Five members.
Board of Directors consists of the Ventura County Board of
Supervisors.
Elected by voting district to staggered, four-year terms of office
(elections held in even-numbered years).
Board Meetings Tuesdays as scheduled, beginning at 8:30 a.m., in the Board of
Supervisors Hearing Room located at 800 S. Victoria Avenue,
Ventura, CA 93009.
Webcast live on the County’s website, and available for viewing
anytime on the County’s website.
Services Provided
VCWD 19 is authorized to provide potable water service.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 4 of 17
Population and Area Information
Population1 Area (square miles)
Jurisdictional Area 3,179 23.4
Sphere of Influence Area 3,200 31.41
Staffing – Full Time Equivalent Positions2
Executive/Management Professional/Support Operational Total
8 16 36 60
Revenues Expenditures
Primary Revenue Sources Primary Expenses
Charges for Services Fixed Assets
Other Financing Sources Services and Supplies
Miscellaneous Revenues Other Charges
FY 2021-22 Revenues (Budget) FY 2021-22 Expenditures (Budget)3
$ 8,543,000 $ 8,339,500
Public Agencies with Overlapping Jurisdiction
Calleguas Municipal Wa ter District Ventura County Air Pollution Control District
Camarillo Health Care District Ventura County Fire Protection District
Camarillo Sanitary District Ventura County Resource Conservation District
City of Camarillo Ventura County Service Area No. 14
Fox Canyon Groundwater Management Agency Ventura County Service Area No. 32
Gold Coast Transit District Ventura County Transportation Commission
Metropolitan Water District of Southern California Ventura County Watershed Protection District
Pleasant Valley Recreation and Park District Ventura County Waterworks District No. 19
United Water Conservation District Ventura Regional Sanitation District
1 Source: Population includes 1,429 within the Somis Census Designated Place (based on 2020 U.S. Census Bureau
data) plus approximately 1,750 within the surrounding area within the jurisdiction of VCWD 19.
2 The District is staffed by the Ventura County Water and Sanitation Department (VCWSD or Department). The
duties associated with each of the positions within the VCWSD involves all of the projects and facilities managed by
the VCWSD, including those associated with the District. Therefore, the number of employees identified above
does not reflect full-time positions assigned to the District.
3 VCWD 19 staff (i.e., County staff) indicates that the budgeted net gain is due to capital improvement projects and
essential operating costs being estimated to be $203,500 lower than estimated revenues for Fiscal Year 2021-22.
The District has an unrestricted net position totaling $1,192,466 for the year ending June 30, 2021.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 5 of 17
Growth and Population Projections
LAFCo is required to project the growth and population for the affected area (Government Code
§ 56430(a)(1)).
The population of the District includes 1,429 within the Somis Census Designated Place (based
on 2020 U.S. Census Bureau data) plus approximately 1,750 within the surrounding area of
VCWD 19, for a total of approximately 3,179 residents. The sphere of influence of the District is
estimated to have a slightly higher population (approximately 3,200). In February 2021, the
County approved a development project (i.e., the “Somis Ranch Farmworker Housing Project”)
that accommodates the construction of 360 dwellings within the District’s jurisdictional area
and will likely result in the addition of at least 1,000 residents within the District.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 6 of 17
Review of Municipal Services
The review of the District’s services is based on provisions of state law which require LAFCo to
make determinations regarding the present and planned capacity of public facilities, the
adequacy of public services, infrastructure needs and deficiencies, and the District’s financial
ability to provide these services (Government Code § 56430(a)(3)).
Potable Water Services
Service Area and Distribution System
The District provides retail water service to 1,085 customers (818 municipal/industrial
customers and 267 agricultural customers) within the unincorporated community of Somis
(immediately northeast of and contiguous to the City of Camarillo). The District is responsible
for administrative, billing, customer service, maintenance, operation, design, construction and
inspection, laboratory, and regulatory compliance services that support the water service
within its jurisdiction. The District’s water sources include: (1) imported water from the
Calleguas Municipal Water District (CMWD) supplied through the State Water Project (which is
occasionally supplemented with water from the Colorado River Aqueduct),4 and
(2) groundwater from the Las Posas Valley Basin through three active wells that are owned and
operated by the District.
According to the Ventura County Waterworks District No. 19 Water Master Plan (October 31,
2011), the District was formed in 1980 to assume responsibility for water service that was
previously provided by the Rancho Las Posas Mutual Water Company within the
unincorporated community of Somis. District staff reports that the system it acquired was in
disrepair and provided unreliable service to its customers (i.e., frequent service interruptions
and poor water quality), which has resulted in the need for the District to expend resources on
substantial capital improvement projects to replace outdated and undersized pipeline.
According to District staff, the District’s water distribution system consists of three wells, eight
reservoirs that can store approximately 3.19 million gallons (MG) of potable water, seven
booster pump stations, 15 pressure reducing stations, and approximately 46 miles of water
pipeline ranging from 2 inches to 14 inches in diameter. Some of the District’s pipelines along
Los Angeles Avenue (Highway 118) were installed in between 1927 and 1930 and are in need of
replacement.
The District maintains an average storage volume of approximately 2.17 MG; however, it would
benefit from increased storage capacity (i.e., reservoirs located at lower elevations that are less
reliant on pumping) and the addition of redundant storage to improve reliability. Additionally,
an increase in storage capacity would allow for reduced pumping during peak electrical cost
times. Future development within the District’s service area will likely result in the need for
4 State Water Project water and Colorado River Aqueduct water are supplied by the Calleguas Municipal Water
District (a wholesaler of the Metropolitan Water District of Southern California).
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 7 of 17
additional infrastructure to ensure adequate fire flow and emergency water storage for its
customers.
The District provides water service to two properties located outside its jurisdictional
boundaries but within its sphere of influence, neither of which is contiguous to the District’s
existing boundaries: (1) Assessor’s Parcel Number (APN) 107-0-110-095 is served by a 1-inch
meter (service initiated July 15, 2011) and (2) APN 108-0-090-165 is served by one 3-inch meter
(service initiated May 7, 1999). Pursuant to Government Code Section 56133, a city or district
may provide new or extended services outside its jurisdictional boundary only if it first requests
and receives approval from LAFCo, except under limited circumstances (i.e., LAFCo approval is
not required for services provided by an agency on or prior to January 1, 2001). The District’s
service to APN 108-0-090-165 predates the requirement for LAFCo approval. However, service
to APN 107-0-110-095 (i.e., a 183-acre property designated by the Ventura County General Plan
as Open Space and developed with a single-family residence) is unauthorized as LAFCo approval
to provide the service would be required and the service provision does not appear to comply
with the provisions of Government Code Section 56133.
Water Supply and Demand
The District’s water supply consists of 99.7 percent groundwater pumped from local wells, and
the remaining is imported water supplied through the CMWD. Pursuant to the Ventura County
Waterworks District No. 19 Water Master Plan (October 31, 2011), local groundwater is
blended with water supplied by CMWD before being delivered to the District’s customers, in
order to achieve a consistent high quality of water delivered (to dilute naturally occurring
groundwater constituents, such as iron and manganese, present in the groundwater) and to
provide the most cost-effective service given the high price of imported water; however, the
exact proportion of water from each source varies throughout the District’s service area based
on proximity to each of these water sources.
The Water Master Plan states that average demand for the maximum month was 4.73 million
gallons per day (MGD) during the period of 2004 through 2008. District staff states that the
average daily demand during the same period was 2.88 MGD, and that the current daily
average (i.e., over the last five years) is 1.96 MGD (i.e., 2,195 acre-feet per year (AFY)). The
District’s water conveyance system can accommodate approximately 6,225 gallons per minute
(GPM) (10,041 AFY). The Water Master Plan estimated the maximum daily demand at 7.19
MGD (8,053 AFY); however, according to District staff, total water demand has decreased
significantly to 2,480 AF (in 2018), 2,077 AF (in 2019), 2,131 AF (in 2020), and 2,196 AF (in
2021), with an average of 2,487 AFY over the last 12 years. While anticipated future water use
is volatile and highly dependent on agricultural demand (which constitutes approximately 70
percent of demand within the District’s service area), demand into the foreseeable future is
expected to be approximately 2,200 AFY during normal years, 2,305 AFY during single dry years,
and approximately 3,000 AFY during multiple dry years.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 8 of 17
Because the District serves fewer than 3,000 customers and less than 3,000 AFY,5 it does not
qualify as an urban water supplier that is required, every five years, to prepare and adopt an
urban water management plan (UWMP) pursuant to the Urban Water Management Planning
Act enacted by the California State Legislature in 1983. Therefore, a comprehensive and up-to-
date discussion of current and expected water supply and demand, supply reliability, and water
shortage contingency planning and conservation efforts is not regularly consolidated into a
single report that is easily accessible to the public. While the District’s master plan guides its
actions related to operation, maintenance, and infrastructure improvements to meet its service
needs, the District and its customers would benefit from an update to the master plan to reflect
current water supply and demand figures, infrastructure, population, and capital improvement
needs, availability of the master plan on the VCPWA’s website, and/or formal
reporting/updates that are easily accessible to the public.
Imported Water Supply
Over the past three years, the District’s imported water averaged approximately 189 AFY, or
about 0.3 percent of total water supply. Imported water is blended with groundwater for
delivery to all customers, regardless of user type; however, the ratio of blending is a function of
proximity of the service to the supply sources.
Groundwater Supply
The District’s groundwater supply comes from the East Las Posas Groundwater Basin underlying
the District’s service area, which is pumped from the District’s three active wells (Well No. 2
(approximately 26 percent), Well No. 3 (approximately 7 percent), and Well No. 4
(approximately 31 percent)). A map of the underlying groundwater basins is provided below in
Figure 3.
5 During the last 12 years, demand within the District once exceeded 3,000 AF when it delivered 3,015 AF in 2013.
Unless the District establishes a pattern of demand exceeding 3,000 AFY, it does not appear that preparation of a
UWMP is necessary.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 9 of 17
Figure 3: Underlying Groundwater Basins
(Source: California Department of Water Resources, 2019)
The District’s groundwater extraction volume is controlled by the Fox Canyon Groundwater
Management Agency (FCGMA), which sets allocation limits based on safe yield of the basin and
consistent with the purpose of the Groundwater Sustainability Plan (GSP) for the Las Posas
Valley Basin (December 2019). The FCGMA Board of Directors adopted Emergency Ordinance E
in 2014 in response to severe drought conditions, declining water levels, and seawater
intrusion, and imposed 20-percent reductions on groundwater extractions. Under the
ordinance, VCWD 19’s extraction allocation was 1,844 AFY, and the District pumped 1,843 AF,
1,574 AF, and 1,784 AF during the three years it was subject to that allocation. In 2019, the
FCGMA adopted a new ordinance to establish a groundwater extraction allocation system for
the Las Posas Valley Basin in support of long-term groundwater sustainability efforts, effective
October 1, 2021, until such time as the adjudication of the basin is completed, replacing the
allocations established through Emergency Ordinance E. The District’s current allocation is
2,305 AFY, and it produced 1,866 AF in 2020 and 2,187 AF in 2021. The FCGMA will establish
the safe yield and resulting allocation to the District at 5-year intervals, in compliance with the
GSP.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 10 of 17
The District chlorinates extracted groundwater and, in the case of water extracted through Well
No. 4 is treated for high iron and manganese before it is released into the potable water
distribution system. The CMWD’s aquifer storage and recovery program (which stores surplus
water underground for later use) allows groundwater yield to be maximized and increases
water supplies to ensure that its customers, including the District, are able to meet the demand
of their customers.
Capital Improvement Projects
In addition to routine infrastructure maintenance activities, the District has several planned
capital improvements including: (1) Well No. 2 treatment to filter iron and manganese from the
water, which is currently underway ($3.137 million to be funded by grants, service costs, and
special fees, (2) replacements of aging pipelines within the CalTrans right-of-way ($2.5 million
to be funded by grants and service revenues); (3) 538 Reservoir Replacement ($1 million
projected funding by development, rates and grants); (4) 538 Pump Station Generator
($300,000, projected funding by rates and grants), and (5) Bradley Pump Station installation for
Greentree Reservoir ($1 million, projected funding by rates and grants).
Water Conservation Measures and Efforts
The Ventura County Waterworks Districts Rules and Regulations (R&Rs) were revised and
approved on September 14, 2021, per Resolution No. 21-126. The updated R&Rs outline
Shortage Levels 1 through 6 that are imposed when water supply is reduced. For example, a
Shortage Level 1 and 2 are imposed when the District expands public information asking for
voluntary water restrictions. Shortage Level 3 and 4 are mandatory and prohibited measures
imposed with noncompliance penalties. Shortage Level 5 is imposed when the District
restriction outside irrigation with enforcement. Shortage Level 6 is imposed when the District
demands reduction measures such as no new potable water services or annexations. The
District’s ongoing customer outreach program includes reminders for voluntary water
conservation and information regarding Metropolitan Water District of Southern California’s
offers.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 11 of 17
Sphere of Influence
There have been no changes to the District’s service area that would require alterations to its
sphere of influence boundary, and no changes are anticipated in the foreseeable future.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 12 of 17
Written Determinations
The Commission is required to prepare a written statement of its determinations with respect
to each of the subject areas provided below (Government Code § 56430(a)).
1. Growth and population projections for the affected area
• The population of the District includes 1,429 within the Somis Census Designated Place
(based on 2020 U.S. Census Bureau data) plus approximately 1,750 within the
surrounding area of VCWD 19, for a total of approximately 3,179 residents. The sphere
of influence of the District is estimated to have a slightly higher population
(approximately 3,200). In February 2021, the County approved a development project
(i.e., the “Somis Ranch Farmworker Housing Project”) that accommodates the
construction of 360 dwellings within the District’s jurisdictional area and will likely result
in the addition of at least 1,000 residents within the District.
2. The location and characteristics of any disadvantaged unincorporated communities within
or contiguous to the sphere of influence
• A disadvantaged unincorporated community is defined as a community with an annual
median household income that is less than 80 percent of the statewide annual median
household income (Government Code § 56033.5). No disadvantaged unincorporated
communities are located within or contiguous to the District’s sphere of influence.
According to Ventura LAFCo Commissioner’s Handbook Section 3.2.5, Ventura LAFCo
has identified Nyeland Acres (within the City of Oxnard’s sphere of influence to the
north of the city) and Saticoy (within the City of San Buenaventura’s sphere of influence
to the east of the city) as disadvantaged unincorporated communities.
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies
Water services:
• VCWD 19 operates a potable water system that provides domestic water service to
1,085 municipal/industrial and agricultural customers within the unincorporated
community of Somis.
• The District’s water distribution system consists of three wells, eight reservoirs, seven
booster pump stations, 15 pressure reducing stations, and approximately 46 miles of
water pipeline. Existing infrastructure appears to be adequate to serve the District’s
customers.
• VCWD 19’s water sources include imported water from the Calleguas Municipal Water
District (CMWD) and groundwater from the Las Posas Valley Basin (approximately 99.7
percent) through three active wells owned and operated by the District.
• The District has demonstrated that it has the capacity to provide additional service and
facilities, as needed.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 13 of 17
• The District maintains an average storage volume of approximately 2.17 million gallons
(MG); however, it would benefit from increased storage capacity (i.e., reservoirs located
at lower elevations that are less reliant on pumping) and the addition of redundant
storage to improve reliability.
• Total water demand within the District over the last four years was 2,480 acre-feet (AF)
in 2018, 2,077 AF in 2019, 2,131 AF in 2020, and 2,196 AF in 2021, with an average of
2,487 AFY over the last 12 years. District staff anticipates demand of 2,200 AFY during
normal years, 2,305 AFY during single-dry years, and 3,000 AFY during multiple-dry
years. The District should consider formalizing its water use projections for normal
years, single-dry years, and multiple-dry years.
• Over the past three years, the District’s imported water averaged approximately 189
AFY of total water supply. Imported water is blended with groundwater for delivery to
all customers, regardless of user type; however, the ratio of blending is a function of
proximity of the service to the supply sources.
• The District’s groundwater supply comes from the East Las Posas Groundwater Basin
underlying the District’s service area, which is pumped from the District’s three active
wells.
• The District’s extraction allocation, controlled by the Fox Canyon Groundwater
Management Agency (FCGMA) was established in 2020 at 2,305 AFY. In 2020, it
produced 1,866 AF, and in 2021, it produced 2,187 AF.
• The District has several planned capital improvements, including improvements to Well
No. 2, pipeline replacements, replacement of a reservoir, and the new Bradley Pump
Station.
• On January 1, 2022, the District implemented automated meter infrastructure system to
allow for better monitoring of leaks and to assist customers in meeting conservation
targets.
• The District has a water shortage contingency plan, which is contained within the
Ventura County Waterworks Districts Rules and Regulations.
• The District is equipped with emergency generators for the purpose of providing back-
up power to its water distribution system.
• The District recently began using a utility management system (i.e., Sedaru), which
allows District staff to digitally view its mapped infrastructure as an overlay to the
County’s GIS data, and assists the District in analyzing its existing services and
anticipated needs.
• While the District’s 2011 master plan guides its actions related to operation,
maintenance, and infrastructure improvements to meet its service needs, the District
and its customers would benefit from an update to the master plan to reflect current
water supply and demand figures, infrastructure, population, and capital improvement
needs, availability of the master plan on the VCPWA’s website, and/or formal
reporting/updates that are easily accessible to the public.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 14 of 17
4. Financial ability of agencies to provide services
• VCWD 19 has a steady stream of revenue through service fees collected from its
customers. It has predictable expenses related operation and maintenance services, as
well as administrative and management services provided by the County.
• VCWD 19 staff (i.e., County staff) indicates that the budgeted net gain is due to capital
improvement projects and essential operating costs being estimated to be $203,500
lower than estimated revenues for Fiscal Year 2021-22. Unrestricted net position
totaled $1,192,466 for the year ending June 30, 2021. As part of the annual budget
process, the water rates are reviewed to determine whether adjustments are needed to
accommodate projected expenses. Rate adjustments are considered by the VCWD 19
Board of Directors (i.e., the Ventura County Board of Supervisors) subject to Proposition
218 (which, generally, establishes that new taxes are subject to voter approval). Service
charges are collected by VCWD 19 through monthly service bills mailed to customers.
• VCWD 19’s established reserves policy December 8, 2020, (Resolution No. 20-144)
approved reserve fund targets of 25 percent of operating expenses, 10 percent of
operating revenue, and 2 percent of net assets. Over the last three years, VCWD 19 has
maintained reserves ranging between 13 percent and 14 percent of total revenue,
meeting the Board approved reserve targets.
• VCWD 19 has a five-year (FY 2022-26) capital improvement plan consisting of $14.7
million, which is projected to be funded through service charges, grants, and loans.
• VCWD 19 has long-term debt financing for a term of 23 years through the County of
Ventura issuance of revolving credit agreement notes, currently $2,525,000 as of June
30, 2021, which proceeds were used to pay, in full, VCWD 19’s debt obligations with the
United States Department of Agriculture.
• Based on the information above, it appears that VCWD 19 can finance the services it
currently provides.
• VCWD 19 is independently audited on a regular basis as part of the annual audit of the
County. The most recent audit (March 11, 2022) prepared for the County was
unqualified. An unqualified report reflects fair and transparent financial statements in
compliance with generally accepted accounting principles and statutory requirements.
5. Status of, and opportunities for, shared facilities
• None were identified.
6. Accountability for community service needs, including governmental structure and
operational efficiencies
• The District is accountable to its constituents through its elected Board of Directors (i.e.,
the Ventura County Board of Supervisors), adherence to applicable government code
sections, open and accessible meetings, and dissemination of information.
• The District has adapted to the changing needs of public access as a result of the disease
caused by the novel coronavirus (COVID-19) pandemic, by providing live internet access
and public participation opportunities for its meetings.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 15 of 17
• The District achieves operational and management efficiencies by being managed and
staffed by the County of Ventura. Additionally, it has arrangements with various service
providers. For example, the District receives the following services from the County of
Ventura: office space, management, accounting/auditing, legal counsel, real estate, and
insurance.
• The District’s Water Master Plan was prepared in October 2011 and is not currently
planned to be updated.
• The District, through the County of Ventura, is a member of the California
Water/Wastewater Agency Response Network WARN (CALWARN) program (which
supports and promotes statewide emergency preparedness, disaster response, and
mutual assistance processes for public and private water and wastewater utilities in
coordination with the State Office of Emergency Services).
• The County Public Works Agency’s Water and Sanitation Department maintains a
website that contains general information about the District, contact information, a
summary of services, and projects recently completed and under construction. The
website provides a Spanish translation option. The District could improve its
transparency by clarifying that the District is a dependent district that is managed and
operated by the County of Ventura, and by posting links to the District’s history,
mission, enabling legislation, boundary map, summary of facilities, Board of Directors
meeting information (agendas, staff reports, minutes, and video recordings), current
and historical budgets, studies and reports, most recent municipal service review
completed by LAFCo, and the State Controller’s “By the Numbers” (agency financial
reporting information) and “Public Pay” (employee salary) webpages. Much of this
information could likely be provided by means of links to the appropriate webpages of
the County’s website. Additionally, to improve the public’s ability to easily access
District information, the utilities pages of the Water and Sanitation Department could
be organized to include all District information (e.g., including the Water Master Plan,
Water Quality Reports, rates and charges, construction projects, and citizens’ advisory
committee meetings) into one central location.
• The District is supported by a Citizens’ Advisory Committee, which meets in alternating
months and serves as a liaison between the community and the District. The Citizens’
Advisory Committee reviews staff recommendations regarding annual budgets, water
and sanitation rate adjustments, capital improvement projects, annexation issues, new
policy items, and other issues related management of the District, and makes
recommendations to the Board of Directors.
• District staff was responsive in providing information for this MSR during the requested
timeframe.
7. Any other matter related to effective or efficient service delivery, as required by
Commission policy
• The Sustainable Groundwater Management Act (SGMA) of 2014 requires the formation
of local groundwater sustainability agencies (GSAs) for high- or medium-priority water
basins, as determined by the state. GSAs are required to evaluate local water basin
conditions and develop groundwater sustainability plans (GSPs). The purpose of a GSP is
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 16 of 17
to define sustainability for an individual basin and establish a path toward sustainability
by 2040 for high-priority basins, and 2042 for medium-priority basins. The Las Posas
Basin is listed as a high-priority basin, pursuant to the State Department of Water
Resources (DWR). The Fox Canyon Groundwater Management Agency is the GSA for all
areas of the Las Posas Basin except for the portion located within the jurisdictional area
of the Camrosa Water District. The Fox Canyon Groundwater Management Agency
adopted a GSP for the entire Las Posas Basin in December 2019, which was approved by
the DWR in January 2022.
Ventura County Waterworks District No. 19 – Municipal Service Review
May 18, 2022
Page 17 of 17