Ventura Local Agency Formation Commission
Calleguas Municipal Water
District
Municipal Service Review
Prepared By:
Ventura Local Agency Formation Commission
801 S. Victoria Avenue, Suite 301
Ventura, CA 93003
Accepted by the Commission on March 15, 2023
Table of Contents
Introduction ....................................................................................................................................... 1
Maps................................................................................................................................................... 3
Profile ................................................................................................................................................. 4
Growth and Population Projections................................................................................................... 6
Review of Municipal Services............................................................................................................. 7
Sphere of Influence .......................................................................................................................... 28
Written Determinations ................................................................................................................... 29
Introduction
Purpose of the Municipal Service Review
Local Agency Formation Commissions (LAFCos) exist in each county in California and were
formed for the purpose of administering state law and local policies relating to the
establishment and revision of local government boundaries. According to the Cortese-Knox-
Hertzberg Local Government Reorganization Act of 2000 (California Government Code § 56000
et seq.), LAFCo’s purposes are to:
• discourage urban sprawl;
• preserve open space and prime agricultural land;
• ensure efficient provision of government services; and
• encourage the orderly formation and development of local agencies.
To achieve these purposes, LAFCos are responsible for coordinating logical and timely changes
in local government boundaries (such as annexations), conducting special studies that identify
ways to reorganize and streamline governmental structure, and determining a sphere of
influence for each city and special district over which they have authority.
A sphere of influence is a plan for the probable physical boundaries and service area of a local
agency, as determined by LAFCo (Government Code § 56076). Beginning in 2001, each LAFCo
was required to review, and as necessary, update the sphere of each city and special district on
or before January 1, 2008, and every five years thereafter (Government Code § 56425(g)).
Government Code § 56430(a) provides that in order to determine or update a sphere of
influence, LAFCo shall prepare a Municipal Service Review (MSR) and make written
determinations relating to the following seven factors:
1. Growth and population projections for the affected area.
2. The location and characteristics of any disadvantaged unincorporated communities
within or contiguous to the sphere of influence.
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies including needs or deficiencies related to sewers,
municipal and industrial water, and structural fire protection in any disadvantaged,
unincorporated communities within or contiguous to the sphere of influence.
4. Financial ability of agencies to provide services.
5. Status of, and opportunities for, shared facilities.
6. Accountability for community service needs, including governmental structure and
operational efficiencies.
7. Any other matter related to effective or efficient service delivery, as required by
Commission policy.
MSRs are not prepared for counties, but are prepared for special districts including those
governed by a county Board of Supervisors. Additionally, while LAFCos are authorized to
prepare studies relating to their role as boundary agencies, they have no investigative
authority.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 1 of 34
LAFCo staff prepared this MSR for the Calleguas Municipal Water District (CMWD or District)
using information obtained from multiple sources, including, but not limited to:
• MSR Questionnaire: A questionnaire supplied by LAFCo elicited general information
about the District (e.g., contact information, governing body, financial information), as
well as service-specific data;
• Budget: The adopted budget provided information regarding services and funding
levels;
• General Plans: General Plans of Ventura County, and the cities of Camarillo, Moorpark,
Oxnard, Port Hueneme, Simi Valley, and Thousand Oaks provided information regarding
land use, populations, and service levels;
• District Documents: Various District documents provided supplementary information
relating to service provision;
• Historical MSR: The 2004 MSR provided certain data that remain relevant and accurate
for inclusion in the current MSR;
• District Website: The District’s website provided supplementary and clarifying
information; and
• District Staff: District staff provided supplementary and clarifying information.
Organization of the MSR
This report is organized into several sections, as follows:
• Maps: A general location map and the official LAFCo map of the District;
• Profile: Summary profile of information about the District, including contact
information, governing body, summary financial information, and staffing levels;
• Growth and Population Projections: Details of past, current, and projected population
for the District;
• Review of Municipal Services: Discussion of the municipal services that the District
provides;
• Sphere of Influence: Discussion of the existing sphere of influence of the District and
potential modifications to the sphere; and
• Written Determinations: Recommended determinations for each of the seven
mandatory factors for the District.
The Commission’s acceptance of the MSR and adoption of written determinations will be
memorialized through the adoption of a resolution that addresses each of the seven mandatory
factors based on the Written Determinations section of the MSR.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 2 of 34
Maps
Figure 1: Location Map for Calleguas Municipal Water District
Figure 2: Official LAFCo Map
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 3 of 34
Profile
The District’s mission is provided as follows:
To provide our service area with a reliable supplemental supply of regional and locally
developed water in an environmentally and economically responsible manner.
The Calleguas Municipal Water District was formed in 1953 in response to recurring droughts
and an expanding population to establish a reliable supply of water for southeast Ventura
County that would supplement local potable water supplies (e.g., surface water coming from
rainfall and seasonal drainages, as well as groundwater). The District primarily fulfills its
mission by importing and distributing water obtained from the Metropolitan Water District of
Southern California (MWDSC). In 1960, Calleguas became a member agency of the MWDSC,
which provides a significant portion of the urbanized southern California region with imported
water from the Colorado River via the Colorado River Aqueduct and from northern California
via the State Water Project (SWP).
Contact Information
District Manager Anthony Goff
District Office 2100 Olsen Road, Thousand Oaks, CA 91360
Mailing Address 2100 Olsen Road, Thousand Oaks, CA 91360
Phone Number (805) 526-9323
Website calleguas.com
E-mail Address tgoff@calleguas.com
Governance Information
Formation Date December 10, 1953
Legal Authority Water Code Section 71000 et seq. (Municipal Water District Law
of 1911)
Type of District Independent
Board of Directors Five members
Elected by voting district to staggered, four-year terms of office
(elections held in even-numbered years)
Board Meetings 1st and 3rd Wednesday of most months, beginning at 5:00 p.m.,
located at 2100 Olsen Road, Thousand Oaks, CA 91360
Services Provided
The Calleguas Municipal Water District is authorized to provide wholesale water, water
treatment, recycled/reclaimed water, agricultural water, groundwater management, water
replenishment, water conservation, and waste water disposal services.1
1 “Waste water” is distinct from untreated sewage/“wastewater” and consists of salty brine generated by
groundwater desalting facilities as well as excess recycled water (i.e., treated wastewater).
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 4 of 34
Population and Area Information
Population Area (square miles)
Jurisdictional Area 644,4412 399.23
Sphere of Influence Area 634,5983 413.00
Staffing4
Executive/Management Professional/Support Operational Total
8 22 43 73
Revenues Expenditures
Primary Revenue Sources Primary Expenses
Water Sales Water Purchases
Readiness to Serve5 Salaries and Benefits
Capacity Charge6 Readiness to Serve
FY 2022-23 Revenues (Budget) FY 2022-23 Expenditures (Budget)
$124,176,670 $111,096,050
Public Agencies with Overlapping Jurisdiction
Bardsdale Cemetery Distri ct Oxnard Harbor District
Bell Canyon Community Services District Piru Public Cemetery District
Blanchard/Santa Paula Library District Pleasant Valley County Water District
Camarillo Health Care District Pleasant Valley Recreation and Park District
Camarillo Sanitary District Rancho Simi Recreation and Park District
Camrosa Water District Triunfo Water and Sanitation District
Channel Islands Beach Community Services District United Water Conservation District
City of Camarillo Ventura County Air Pollution Control District
City of Moorpark Ventura County Fire Protection District
City of Oxnard Ventura County Resource Conservation District
City of Port Hueneme Ventura County Service Area No. 4
City of Simi Valley Ventura County Service Area No. 14
City of Thousand Oaks Ventura County Service Area No. 30
Conejo Recreation and Park District Ventura County Service Area No. 32
El Rancho Simi Cemetery District Ventura County Service Area No. 34
Fillmore-Piru Memorial District Ventura County Transportation Commission
Fox Canyon Groundwater Management Agency Ventura County Watershed Protection District
Gold Coast Transit District Ventura County Waterworks District No. 1
Hidden Valley Municipal Water District Ventura County Waterworks District No. 8
Lake Sherwood Community Services District Ventura County Waterworks District No. 17
Metropolitan Water District of Southern California Ventura County Waterworks District No. 19
Oxnard Drainage District No. 1 Ventura County Waterworks District No. 38
Oxnard Drainage District No. 2 Ventura Regional Sanitation District
2 Source: 2020 CMWD Urban Water Management Plan
3 Source: 2021 CMWD Redistricting Study
4 Source: 2022 CMWD Organizational Chart
5 The “Readiness-to-Serve Charge” is a charge intended to recover the principal and interest payments on
MWDSC’s non-tax supported debt service that had been or would be issued to fund capital improvements
necessary to meet the continuing reliability and water quality needs associated with current and projected
demands. The charge is collected by the CMWD and paid to the MWDSC.
6 The “Capacity Charge” is a charge imposed on each of the District’s member agencies and is designed to recover
the cost of providing peaking capacity within the distribution system.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 5 of 34
Growth and Population Projections
LAFCo is required to project the growth and population for the affected area (Government Code
§ 56430(a)(1)).
Growth estimates for the District are estimated using data produced by the 2020-2045 Regional
Transportation Plan/Sustainable Communities Strategy (RTP/SCS) (adopted by the Southern
California Association of Governments in 2020). The 2020 Metropolitan Water District of
Southern California UWMP (June 2021) estimates the population within the portion of its
service area that lies within Ventura County (i.e., the area within the CMWD service area) to be
630,000 as of July 2020. The 2020 Calleguas Municipal Water District UWMP (June 2021),
estimates a 2020 population of 644,441 and projects that the population will increase to
679,367 by 2030 and to 699,089 by 2040.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 6 of 34
Review of Municipal Services
The review of the District’s services is based on provisions of state law which require LAFCo to
make determinations regarding the present and planned capacity of public facilities, the
adequacy of public services, infrastructure needs and deficiencies, and the District’s financial
ability to provide these services (Government Code § 56430(a)(3)).
Potable Water Services
Water Service History
According to the District’s 2020 UWMP, the CMWD was formed in 1953 in response to
recurring droughts, declining groundwater supplies, and a growing population that resulted in
the urbanization of areas previously dominated by agricultural uses. The purpose of the
District’s formation was to establish a reliable supply of water for southeastern Ventura County
that would supplement local potable water supplies (e.g., surface water coming from rainfall
and seasonal drainages, as well as groundwater).
In 1960, the CMWD became a member agency of the MWDSC, which provides the southern
California region with imported water from northern California by means of the State Water
Project (SWP) and from the Colorado River through the Colorado River Aqueduct (CRA), as
described in detail later in this report. In the years that followed, the CMWD constructed the
necessary infrastructure to transport and deliver imported water to its service area. The
District’s 2020 UWMP states that due to the location of its service area, under normal
circumstances the District receives exclusively SWP water. Water delivered through the CRA is
typically used to address variability of the SWP supply; however, due to constraints within the
MWDSC distribution
system, CMWD is
considered a “SWP-
dependent” agency
and can only meet a
small portion of its
demands from the
CRA. Of MWDSC’s 26
member agencies, the
District currently ranks
fourth in terms of
annual imported
water delivery
volume.7 A map
depicting the CMWD
as it relates to the
Figure 3: Metropolitan Water District of Southern California Service Area
MWDSC service area (Source: 2020 MWDSC UWMP)
is provided in Figure 3.
7 Source: MWDSC 2021 Annual Report
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 7 of 34
The District operates under the Municipal Water District Law of 1911 (Division 20 of the Water
Code). Part 5 of the Municipal Water District Law contains the “Powers and Purposes” of a
municipal water district. Specifically, Chapter 2 (Water) identifies the water-related services
that a municipal water district is authorized to provide, including:
• A municipal water district may “acquire, control, distribute, store, spread, sink, treat,
purify, recycle, recapture, and salvage any water, including sewage and storm waters,
for the beneficial use or uses of the district, its inhabitants, or the owners of rights to
water in the district” (Water Code § 71610).
• A municipal water district may undertake water conservation programs (Water Code
§ 71610.5).
• “A district may sell water under its control, without preference, to cities, other public
corporations and agencies, and persons, within the district for use within the district. As
used in this part, the term ‘water’ includes potable water and nonpotable water” (Water
Code § 71611).
The District is authorized to provide wholesale water, water treatment, recycled/reclaimed
water, agricultural water, groundwater management, water replenishment, water
conservation, and waste water disposal services.
Service Area
The service area of the District encompasses approximately 400 square miles, covering much of
southern and eastern Ventura County, including portions or all of the cities of Simi Valley,
Moorpark, Thousand Oaks, Camarillo, Oxnard, and Port Hueneme, and surrounding
unincorporated areas (e.g., Bell Canyon, Lake Sherwood, Oak Park, Santa Rosa Valley, Somis,
and Naval Base Ventura County). The CMWD supplies water to approximately 75 percent of
Ventura County’s population, and water distribution consists of municipal and industrial
customers (95 percent) and agricultural customers (5 percent).
Retail Water Purveyors of the District
The CMWD distributes potable water strictly on a wholesale basis to 19 retail water purveyors,
who in turn deliver water to area residents, businesses, and agricultural customers. The
District’s retail customers consist of both public and private water purveyors, as listed in Table 1
below and depicted in Figure 4 on the following page:
Table 1: Calleguas Municipal Water District Retail Customers
Berylwood Heights Mutual Water Company Golden State Water Company
Brandeis Mutual Water Company Pleasant Valley Mutual Water Company
Butler Ranch Mutual Water Company Solano Verde Water Company
California American Water Company Triunfo Water and Sanitation District
California Water Service Company Ventura County Waterworks District No. 1
Camrosa Water District Ventura County Waterworks District No. 8
City of Camarillo Ventura County Waterworks District No. 19
City of Oxnard Ventura County Waterworks District No. 38
City of Thousand Oaks Zone Mutual Water Company
Crestview Mutual Water Company
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 8 of 34
Figure 4: CMWD Retail Purveyors (Source: Calleguas Municipal Water District 2020 UWMP)
Water Delivery System
The District imports water through a system of infrastructure (i.e., transmission pipelines,
purveyor turnouts, flow and pressure regulating facilities, reservoirs, pump stations, and
hydroelectric generating stations) that delivers water to southeastern Ventura County. The
imported water consists exclusively of supply from the MWDSC that is delivered primarily
through the SWP.
Water delivered to the District is treated at the MWDSC’s Joseph Jensen Filtration Plant in
Granada Hills and is delivered to the District through MWDSC’s West Valley Feeder No. 2
Pipeline to the 1.3-mile long, 96-inch diameter Santa Susana Tunnel8 completed in 1962. The
tunnel transports the water from Chatsworth into Simi Valley where it enters the District’s
distribution system for immediate use by its customers, is stored in Lake Bard (where it is
treated at the Lake Bard Water Filtration Plant prior to distribution), or is injected into the Las
Posas Groundwater Basin for future use, as discussed in more detail later in this report.
The District’s service area is separated into a total of five distinct regions within the “Upper
Zone” (i.e., Simi Valley, Conejo Valley, and Oak Park) and the “Lower Zone” (i.e., Las Posas and
Camarillo), as depicted in the 2020 UWMP (provided below in Figure 5). The District operates
and maintains approximately 130 miles of major transmission pipelines that range from 14
inches to 78 inches in diameter, 12 enclosed reservoirs with a total storage capacity of
8 The West Valley Feeder No. 2 has the capability to deliver a maximum of 300 cubic feet per second (cfs) to the
East Portal of the District’s Santa Susana Tunnel.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 9 of 34
approximately 59 million gallons, six pump stations, groundwater injection wells, pump and
pressure regulating stations, and hydroelectric generators. In addition, at its headquarters
located between the cities of Thousand Oaks and Simi Valley, the District owns and operates
Lake Bard (discussed in more detail below).
Figure 5: CMWD Distribution System (Source: CMWD 2020 UWMP)
The District does not have access to a secondary source of imported water supply. To address
this limitation, the District established Lake Bard, a reservoir located at its headquarters which
can store up to 10,500 acre-feet (AF)9 of water and is used as a water source when imported
supplies are shut down for scheduled maintenance or emergencies. Lake Bard and its related
facilities are discussed in more detail below.
Water Storage
The 2020 UWMP documents that the District has 12 enclosed potable water storage reservoirs
which have a capacity of approximately 59 million gallons. Additionally, the District owns Lake
Bard and operates the Las Posas Aquifer Storage and Recovery (Las Posas ASR) Project,
discussed below. In combination, water deliveries made to storage in Lake Bard and the Las
Posas ASR was 1,729 AF during 2020. Deliveries to storage are estimated to be 1,255 acre-feet
per year (AFY) from 2025 into the foreseeable future (i.e., at least through 2045). The CMWD
typically utilizes this storage during planned supply outages from the MWDSC.
9 An acre-foot is defined as the volume of water that would cover a one-acre area in one foot of water, or
approximately 326,000 gallons.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 10 of 34
• Lake Bard
Lake Bard, an earthen open-surface reservoir that was constructed in the 1960s, is located in
the unincorporated area between the cities of Thousand Oaks and Simi Valley, adjacent to the
CMWD headquarters on Olsen Road, as shown in Figure 6, below. Lake Bard does not impound
surface waters; rather, it is composed entirely of stored imported water.
Figure 6: Location of Lake Bard (Source: 2022 County of Ventura GIS data)
The lake has a storage capacity of 10,500 AF, of which 7,500 AF is available for treatment at the
Lake Bard Water Filtration Plant and distribution as potable water, and the remaining 3,000 AF
may be used as an unfiltered, disinfected, non-potable emergency supply. According to the
2020 UWMP, water stored in Lake Bard is re-treated at the Lake Bard Water Filtration Plant,
which has a treatment capacity of 65 million gallons per day (mgd). The CMWD generally
maintains Lake Bard at capacity in order to maintain maximum levels of emergency water
supply.
Originally, water stored in Lake Bard could provide enough storage for redundancy and
emergency supply for the service area for a one-year time period. By the early 1990s, water
demands increased such that the volume of water stored in Lake Bard is no longer reliable to
provide emergency water supply for a sustained period, and the lake’s water supply could be
depleted between 5.5 weeks (at high flow) and four months (at low flow). This concern was
realized most dramatically following the January 17, 1994, Northridge Earthquake, which
caused pipeline separations and cracked joints to the CMWD’s distribution system; as a result,
imported supplies were only available sporadically for three months and Lake Bard was nearly
depleted.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 11 of 34
• Las Posas Aquifer Storage and Recovery (Las Posas ASR) Project
The Las Posas ASR located in the East Las Posas Basin (west of the City of Moorpark) has the
capacity to support approximately 50,000 AF of water supplies underground for future use. The
Las Posas ASR, developed in the 2000s, consists of 18 dual-purpose wells that accommodate
both injection of imported water into the Las Posas Groundwater Basin for storage of water
supply and extraction of stored water when needed. The Las Posas ASR is expanded upon in
more detail later in this report in the discussion of water supply and groundwater storage
projects. The Grandsen Pump Station enables water extracted through the Las Posas ASR to be
delivered to the District’s entire service area.
Water Supply and Demand Volume
According to the 2020 UWMP, water supply within the CMWD was 89,687 AF (consisting of
89,630 AF of imported water supplied by MWDSC and 57 AF of recycled water provided to
Ventura County Waterworks District No. 8) in 2020. The 2020 UWMP estimates a minimum
combined water supply (imported water plus a minimal amount of recycled water) to be 96,888
AF in 2022 and 88,248 AF in 2023. Imported water supply is expected to be 86,607 AFY by
2025, increasing incrementally into the foreseeable future, reaching 87,720 AFY by 2030,
89,880 AFY by 2035, 91,326 AFY by 2040, and 91,784 AFY by 2045. During the same period,
recycled water supply is anticipated to remain constant at 80 AFY, and supply from storage (i.e.,
reasonably available “outage supplies” consisting of 7,500 AF from Lake Bard and 20,000 AF
from the Las Posas ASR) is anticipated to remain constant at a total of 27,500 AF, for a grand
total supply of 114,187 AFY by 2025, 115,300 AFY by 2030, 117,460 AFY by 2035, 118,906 AFY
by 2040, and 119,364 AFY by 2045.
District staff reports that it delivered 89,666 AF in 2017, 91,338 AF in 2018, and 82,236 AF in
2019. Pursuant to the 2020 UWMP, water demand within the District was 91,940 AF in 2020.
The 2020 UWMP further states that the District anticipates relatively stable imported water
demand for the foreseeable future: 87,461 AFY by 2025, 88,585 AFY by 2030, 90,766 AFY by
2035, 92,227 AFY by 2040, and 92,689 AFY by 2045. These estimates include a constant 1,255
AFY of demand for replenishment water (i.e., water used for injection into the District’s Las
Posas ASR and storage at Lake Bard). District staff attributes these projected demand figures
(which are lower than those estimated in the District’s previous UWMPs) to a demand
hardening effect resulting from the implementation of ongoing water use efficiency measures
and conservation programs.
According to Table 7-2 of the 2020 UWMP, the District estimates that through at least 2045,
water supply during normal years (i.e., demand under average hydrologic conditions, based on
the historical average year conditions from 1922 through 2004) will exceed demand. As
demonstrated below, during normal years, the District anticipates maintaining more than
26,000 AFY in excess supply for the foreseeable future:
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 12 of 34
Table 2: Normal Year Supply and Demand Comparison (in AF)
2025 2030 2035 2040 2045
Supply 114,187 115,300 117,460 118,906 119,364
Demand 87,541 88,665 90,846 92,307 92,769
Difference 26,646 26,635 26,614 26,599 26,595
The 2020 UWMP provides an estimate of supply and demand for single dry years (i.e., demand
under the single driest hydrologic year, based on 1977 conditions) through 2045 in Table 7-3.
As compared with normal years, supply and demand are reduced by approximately 1,000 AFY,
resulting in an excess of supply that is nearly identical to that anticipated for normal years:
Table 3: Single Dry Year Supply and Demand Comparison (in AF)
2025 2030 2035 2040 2045
Supply 113,080 114,190 116,346 117,791 118,244
Demand 86,435 87,556 89,734 91,193 91,651
Difference 26,645 26,634 26,612 26,598 26,593
In multiple dry year conditions (i.e., demand under five consecutive drought year conditions,
based on 1988 through 1992 conditions), estimated difference in supply and demand is
expected to remain stable, despite fluctuations in supply and demand projections during the
five-year period covered by such an estimated period. Table 7-4 of the 2020 UWMP provides
the following:
Table 4: Multiple Dry Years Supply and Demand Comparison (in AF)
2025 2030 2035 2040 2045
Supply 117,282 117,293 119,045 120,784 121,644
Year 1 Demand 90,679 90,690 92,460 94,216 95,085
Difference 26,603 26,603 26,585 26,568 26,559
Supply 124,402 124,414 126,305 128,182 129,111
Year 2 Demand 97,871 97,883 99,793 101,688 102,626
Difference 26,531 26,531 26,512 26,494 26,485
Supply 125,797 125,809 127,727 129,631 130,573
Year 3 Demand 99,279 99,291 101,229 103,152 104,103
Difference 26,518 26,518 26,498 26,479 26,470
Supply 102,480 102,489 103,952 105,404 106,123
Year 4 Demand 75,729 75,739 77,216 78,683 79,408
Difference 26,751 26,750 26,736 26,721 26,715
Supply 111,027 111,036 112,608 114,167 114,938
Year 5 Demand 84,331 84,341 85,928 87,503 88,282
Difference 26,696 26,695 26,680 26,664 26,656
In all cases, supply totals do not consider system losses, which are estimated to be 1 percent of
supply. Based on the evaluation contained in the 2020 UWMP, estimated water supply from
MWDSC is expected to be sufficient to meet projected demands within the CMWD through at
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 13 of 34
least 2045. Peak capacity at the East Portal of the District’s Santa Susana Tunnel is 300 cfs. In
2021, the District’s average day peak demand flow was 190 cfs, which totaled 378 AF for that
peak demand day.10
Imported Water Supply Sources
The CMWD’s potable supply to its retail customers consists entirely of imported water that it
receives from the MWDSC. The CMWD operates as a member agency of the MWDSC within
Ventura County. Water provided by the MWDSC is sourced through the SWP and CRA;
however, the District relies almost exclusively on water from the SWP with only limited supply
from the CRA.
• State Water Project (SWP)
SWP water originates in northern California where it is captured and released into rivers and
streams that reach the Sacramento-San Joaquin River Delta. The water is then transported
south through the California Aqueduct
to SWP contractors (including the
MWDSC) by means of a 500-mile
conveyance network that includes
reservoirs, aqueducts, and pump
stations. The MWDSC filters and
disinfects SWP water at the Joseph
Jensen Filtration Plant in Granada Hills
in Los Angeles County, located as
shown in Figure 7, to the right.
SWP facilities were designed in the
1970s to meet the needs of SWP
contractors at that time, with the idea
that additional facilities would be
added later to support supply
reliability, according to the 2020 Figure 7: Location of Joseph Jensen Filtration Plant
UWMP. As additional facilities were Source: Google Maps (December 2022)
not constructed, and environmental
regulations11 have limited the export of water from the delta, the California Department of
Water Resources (DWR), through the SWP, does not routinely deliver full amounts of
contracted water to its contractors.
Since 2005, the DWR, together with the U.S. Fish and Wildlife Service, National Marine Fisheries
Service, and Bureau of Reclamation Act, has been pursuing a project intended to restore the
10 Source: MWDSC Water Information System - Summary Hi/lo/Avg Daily Flows
11 Native fish reliant on the Delta include the Delta smelt, Chinook salmon, and splittail, which are listed as
threatened or endangered by the federal and state Endangered Species Acts. Protections for these species result
in limitations on the SWP’s water delivery system.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 14 of 34
ecosystem and make improvements to reliability of potable water for human use, including the
correction of “reverse flows” that redirect fish from their migratory paths. This effort,
consistent with the Delta Protection Act of 1992, was prompted by concerns about the existing
water system as it relates to inefficiencies in freshwater capture, lack of redundancy in the
conveyance infrastructure, trapping of endangered fish in pumping equipment, potential levee
failure and saltwater contamination, and climate change. The project was split into two in
2015, consisting of the Bay Delta Conservation Plan (BDCP) (the habitat restoration component)
and California WaterFix (the water delivery infrastructure component).
In 2019, California Governor Newsom issued Executive Order N-10-19, which altered the scope
of the project to include the modernization of conveyance facilities within the Bay Delta,
including new intake facilities in the north Delta along the Sacramento River and a single main
water pipeline (i.e., conveyance tunnel) would transport the diverted water to pumping plants
and ultimately through the SWP and potentially Central Valley Project (CVP) infrastructure to
end users. The proposed project, now known as the Delta Conveyance Project (DCP), would
have the ability to convey a maximum of 6,000 cubic feet per second (cfs) from the Sacramento
River to SWP facilities.
• Colorado River Aqueduct (CRA)
The MWDSC provides water from the Colorado River to its service area by conveying it through
the 242-mile CRA (constructed in the 1930s) from a pumping facility in Lake Havasu which is
located at the California/Arizona
border. The CRA includes 92 miles of
tunnels, 63 miles of concrete canals, 54
miles of concrete conduits, 29 miles of
siphons, and five pumping stations.
Using electricity generated at Hoover
Dam, Parker Dam, and other sources,
pumps lift water over 1,600 feet so the
aqueduct can convey the water to
Southern California. MWDSC’s F.E.
Weymouth Treatment Plant in the City
of La Verne was the first treatment
plant built by the MWDSC in 1940 to
treat CRA supplies, located as shown in
Figure 8: Location of F.E. Weymouth Treatment Plant
Figure 8, to the right. Source: Google Maps (December 2022)
Water Supply and Groundwater Storage Projects
While the District is able to provide water to its customers to meet demand, it recognizes the
importance of broadening its reach to ensure long-term reliability of potable water service
within its service area. CMWD is actively pursuing and implementing a variety of projects that
are intended to either directly or indirectly augment water supply within the District’s service
area and regionally. Despite these investments, a combination of MWDSC’s existing
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 15 of 34
conveyance infrastructure deficiencies and critically low SWP allocations demonstrate that
improvements at the regional and local levels of the existing imported distribution system are
necessary. The discussion that follows provides a summary of projects completed or to be
developed to support water reliability.
• City of San Buenaventura State Water Project Interconnection Project
According to the 2020 UWMP, the District projects that imported water will be wheeled
through its system to the City of Ventura through the SWP interconnection starting in 2025 and
has the potential to provide a long-term average of 5,400 AFY. This project would enable the
City of San Buenaventura to take delivery of its SWP entitlement (i.e., rights to a maximum of
10,000 AFY, which the City has owned since 1971) through the construction of a pipeline
connecting existing CMWD infrastructure in the City of Camarillo to the City of San
Buenaventura, located as shown in Figure 9, below. As designed, SWP water would be wheeled
through MWDSC and CMWD infrastructure to reach the City. Such a project would improve
opportunities for system redundancy for both agencies and would enable the City to expand its
water supply portfolio beyond its currently limited local sources.
Government Code Section 56133(a) requires that a city or district may provide new or extended
services by contract or agreement outside its jurisdictional boundary only if it first requests and
receives written approval from LAFCo. In the case of the interconnection project, LAFCo
approval under Government Code Section 56133 is not necessary because: (1) the treatment by
MWDSC of the City’s SWP water pursuant to the wheeling statutes does not constitute a new
service because the service is required by the wheeling statutes, particularly Water Code
section 1810, which applies “[n]otwithstanding any other provision of law,” and (2) the
construction of the new pipeline and the conveyance of water through the pipeline from the
District to the City of San Buenaventura (and indirectly to the Casitas Municipal Water District
and United Water Conservation District) is intended to compensate for reduced supplies, such
as during severe drought conditions, and to provide access to a replacement supply source for
water supplies that have been reduced or have otherwise become less available. It should be
noted that provision of water through the pipeline beyond that required to either compensate
for reduced supplies or provide a replacement water supply would constitute an extended
service under Government Code section 56133 that would not be covered by the exemption set
forth in subdivision (e)(1).
Figure 9: State Water Interconnection Project Map (Source: 2020 UWMP)
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 16 of 34
• Calleguas Municipal Water District-Las Virgenes Municipal Water District Interconnection
Together with the Las Virgenes Municipal Water District (LVMWD; which provides service in
western Los Angeles County, including the cities of Agoura Hills, Calabasas, Hidden Hills, and
Westlake Village, and surrounding unincorporated areas, and receives nearly all of its water
supply from the MWDSC), the CMWD is working to improve regional system reliability through
a project known as the Calleguas-Las Virgenes Interconnection. This project, which has
completed environmental review and design and is currently under construction, will allow
both involved agencies to transfer and receive potable water in the event of a complete or
partial supply outage as well as during normal operating conditions (e.g., during droughts,
natural disasters, and required system maintenance). The project traverses the Oak Park area
of unincorporated Ventura County and the City of Thousand Oaks in eastern Ventura County,
and the City of Westlake Village in western Los Angeles County. It involves the development of
more than 11,000 feet of 30-inch-diameter potable water pipeline for the interconnection
between the water districts, as well as an underground pump station/pressure regulating
station located near the Ventura County boundary and other ancillary improvements to support
the interconnection. In addition, LVMWD will concurrently install more than 2,000 feet of new
and replacement recycled water pipeline for Yerba Buena Elementary School and Canyon Oaks
Park to provide recycled irrigation water. While implementation of the project would not result
in the generation of new water supply, it would establish supply redundancy that is intended to
benefit both agencies. Additional potential water supply includes indirect potable reuse of
water produced at the LVMWD/Triunfo Water & Sanitation District's planned PureWater Plant,
as well as any additional future local supplies that either agency develops.
The interconnection is intended to ensure that both scheduled and unscheduled interruptions
in water delivery to either agency would not result in the inability of either to continue to
provide water service to its customers, in cases where one agency is impacted and the other is
not. In the event of a sudden or large-scale drawdown event of the LVMWD’s Westlake
Reservoir, due to existing system capacity, the LVMWD would be limited in its ability to refill
the reservoir in an expeditious manner. Therefore, the interconnection could facilitate the
LVMWD’s filling of its Westlake Reservoir during an off-peak period, such as during the winter
months. Therefore, it appears that the proposed interconnection is consistent with
Government Code Section 56133 (which addresses the ability of agencies to provide services
outside their jurisdictional boundaries).
• Crestview Mutual Water Company Interconnection
The Crestview Mutual Water Company (Crestview) is a private domestic water supplier that
serves the western portion of the City of Camarillo. Its water supply is derived from
groundwater and imported water from the CMWD. In 2020, Crestview and the CMWD
completed an interconnection project that allows for a maximum flow rate of 5 cfs when
needed by the CMWD in the event of an imported supply outage. Crestview Well No. 8 and the
Agreement to Deliver Water During an Outage essentially enables Crestview to deliver water to
the CMWD for use within the District’s service area. In exchange for CMWD’s financial support
of development of Well No. 8, Crestview is obligated to supply a minimum of 3 cfs when
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 17 of 34
needed by CMWD. CMWD compensates Crestview for the water and resupplies Crestview at a
later date with imported water.
• Los Angeles Department of Water and Power Lease of West Valley Feeder Pipeline from
MWDSC
The Los Angeles Department of Water and Power (LADWP) leases West Valley Feeder No. 1
Pipeline from the MWDSC. When water is unavailable to CMWD through the West Valley
Feeder No. 2 Pipeline, the LADWP can provide the CMWD with an average of 40 cfs of water
through West Valley Feeder No. 1, treated at the Los Angeles Aqueduct Filtration Plant in
Granada Hills. This arrangement is not documented as part of a formal agreement.
• Las Posas Aquifer Storage and Recovery (ASR) Project (Groundwater Storage)
The CMWD Las Posas ASR Project is located in the East Las Posas Basin (west of the City of
Moorpark). The project, which became operational in 1994, has a total storage capacity of
about 50,000 AF.12 The Las Posas ASR consists of 18 dual-purpose wells that accommodate both
injection of imported water into the Las Posas Groundwater Basin for storage of water supply
and extraction of stored water when needed. The Grandsen Pump Station enables water
extracted through the Las Posas ASR to be delivered to the District’s entire service area.
The 2020 UWMP documents that groundwater use within Ventura County over the last more
than 100 years has resulted in overdraft of groundwater basins and seawater intrusion into the
basins. A portion of water used by customers of CMWD retailers is treated at wastewater
treatment facilities and discharged into the Calleguas Creek Watershed, eventually percolating
into aquifers where it supports groundwater recharge. Groundwater within local aquifers has
become progressively saline as a result of the introduction of imported water and deep-aquifer
pumped groundwater, wastewater discharges, urban and agricultural runoff, applied irrigation,
and native marine sediments.
While the District does not pump native groundwater, it stores and extracts imported water
supplies via the Las Posas ASR program. The 2020 UWMP states that direct injected storage in
the Las Posas ASR Wellfield is approximately 20,926 AF as of December 2020. The MWDSC
implements a Cyclic Storage Program, which enables purchase of surplus water when available
to be stored for future use, and involves a suspension of MWDSC capacity charges. In 2019, the
District injected approximately 8,300 AF, including almost 6,000 AF under the Cyclic Storage
Program.
The District is also involved in groundwater storage programs. In the early 1990s, the District
pursued an in-lieu water storage strategy involving District supply to well operators to reduce
groundwater pumping demand. Storage credits accumulated in this way are transferred to the
District. Additionally, the District accumulated groundwater storage credits by means of the
Conejo Creek Diversion Project, which diverts water from Conejo Creek (which consists of
12 Source: FCGMA Groundwater Sustainability Plan for the Las Posas Valley Basin (p. 1-21).
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 18 of 34
recycled wastewater generated by the City of Thousand Oaks’ Hill Canyon Wastewater
Treatment Plant) for agricultural and landscaping irrigation purposes primarily within the
Camrosa Water District’s service area and secondarily within the Pleasant Valley County Water
District’s service area. The CMWD currently holds 23,453 AF of credits in its Conejo Creek Project
storage account. The use of these credits is subject to the FCGMA’s approval. The CMWD stopped
accruing credits when the project was transferred to the Camrosa Water District, and these credits
were all accrued prior to 2014.
• Salinity Management Pipeline (SMP)
As discussed in greater detail below in the section of this report regarding waste water disposal
services (distinct from “wastewater” disposal) provided by the District, the CMWD operates the
regional Salinity Management Pipeline (SMP) that collects brine generated by groundwater
desalting facilities and conveys that water for safe discharge to the Pacific Ocean. The SMP
supports use of local groundwater resources and diversification of water supply within
southeastern Ventura County by creating new opportunities for development of groundwater
treatment facilities, resulting in the encouragement of use of local groundwater supplies to
support existing and future development.
Water Conservation Measures and Efforts/Demand Management
The District developed a Water Shortage Contingency Plan (WSCP), discussed in more detail
below, in preparation for potential reductions in imported water deliveries by the MWDSC
resulting from severe water shortage conditions or catastrophic interruption of water supply
conditions. The CWMD’s WSCP is closely tied to the contents of MWDSC’s WSCP, given that the
District is entirely reliant on the MWDSC for its water supply; however, the CMWD has
developed its own water shortage contingency measures. All measures related to water
shortage conditions assume continued reliance on (i.e., no catastrophic failure of) the Santa
Susana Tunnel. The District has established the following shortage levels and corresponding
responses:
• Shortage Level 1: Up to 10 percent required reduction
• Shortage Level 2: Up to 20 percent required reduction
• Shortage Level 3: Up to 30 percent required reduction
• Shortage Level 4: Up to 40 percent required reduction
• Shortage Level 5: Up to 50 percent required reduction
• Shortage Level 6: Greater than 50 percent required reduction
Water demand reductions for Shortage Levels 1 through 5 would be met by existing storage,
flexible supplies, voluntary demand reductions, and MWDSC’s Water Supply Allocation Program
(WSAP) or Emergency Water Conservation Program (EWCP) supply allocations (as applicable).
In addition to the responses outlined for Shortage Levels 1 through 5, Shortage Level 6 involves
potential prohibition of outdoor water use. All shortage levels include demand reduction
actions that include an expanded public information campaign; offer of rebates on water-saving
plumbing fixtures, devices, landscaping irrigation efficiency, and turf replacement; a
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 19 of 34
moratorium or net zero demand increase requirement on new connections; implementation or
modification of drought rate structure or surcharge; and/or reduction of system water loss.
Mandatory reductions in water consumption may include any of the following: restrictions on
irrigation hours to evening and early morning hours; prohibition of non-essential irrigation;
restrictions on all irrigation; prohibition of filling of ornamental lakes, ponds, pools, and
fountains; prohibitions on washing vehicles, streets, or outdoor paved surfaces; restrictions on
the use of water from fire hydrants for construction purposes; and implementation of a rate
structure for charges and penalties for water use restriction violations.
Since 2015, the CMWD Board of Directors has taken several actions related to water shortages:
• On April 15, 2015, the Board declared a Stage 4 water shortage and implemented a
water supply allocation program consistent with a plan adopted by the MWDSC in an
effort to manage water demand in response to reductions in available water supplies;
• On May 18, 2016, as a result of increased rainfall, runoff, and reservoir levels, the Board
declared a Stage 3 water shortage, and suspended enforcement of previously-
developed water supply allocations;
• On May 17, 2017, the Board rescinded the Stage 3 water shortage condition, thereby
eliminating the shortage condition;
• On August 18, 2021, in response to the recurrence of dry conditions in 2020, the Board
declared a Stage 2 water shortage condition throughout the District’s service area,
immediately following MWDSC’s August 17, 2021, declaration of a water supply alert
regarding severe drought conditions; and
• On April 6, 2022, the Board declared a Stage 3 water shortage condition throughout the
District’s service area.
Shortly after the April 6, 2022, declaration of a Stage 3 water shortage condition, on April 26,
2022, the District adopted an Emergency Water Conservation Program that mandated its retail
providers implement a 1-day per week outdoor watering restriction or receive a strict allocation
of imported water supplies.
Water Shortage Contingency Planning
The District has developed a WSCP that establishes a set of actions for the District to take
during water shortage conditions.13 The WSCP is consistent with that of the MWDSC as a result
of the District’s reliance on the MWDSC for its water supply, and builds on that plan by
including additional water shortage contingency measures. The District’s WSCP includes the
MWDSC’s Water Surplus and Drought Management Plan, the MWDSC’s 2014 Water Supply
Allocation Plan, and an Imported Water Outage Protocol (IWOP), which details potential
methodologies for supply allocation to CMWD’s retail water providers during a catastrophic
interruption of imported water. The 2020 UWMP states that except for a catastrophic failure of
13 The District’s WSCP was prepared in compliance with California Water Code Section 10632, which requires that
every urban water supplier prepare and adopt a WSCP as part of its UWMP.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 20 of 34
the Santa Susana Tunnel or other critical infrastructure, the imposition of allocations is unlikely
if not required by the MWDSC. In 2021, the District completed the Seismic Risk Mitigation
Measures and Repair Options Study of Seismic Impacts to the Santa Susana Tunnel (Phase 2),
which evaluated the seismic risks to the Santa Susana Tunnel and identified additional actions
to further investigate, prevent, and mitigate that potential. The District is pursuing and
implementing those additional actions. The components of the CMWD’s water shortage
planning are discussed below.
• Water Supply Alternatives Study (WSAS)
In February 2022, the District completed the WSAS, which evaluated 123 potential approaches
to meet demands within the District’s service area during a 6-month imported water supply
outage. The District is implementing several of the projects, including (1) the Fairview Well
Rehabilitation Project, which could supply a maximum of 1.69 cfs and (2) Lake Bard Pump
Station, which would allow the District to treat for potable use the 3,000 AF within the lake that
is current unavailable for potable use. Additionally, the District is pursuing a number of other
potential projects identified from the WSAS.
• Imported Water Outage Protocol (IWOP)
The IWOP discusses the allocation of outage supplies in the case of catastrophic interruption of
imported water, including conditions such as regional power outages, earthquakes, or other
emergency events. Because the District takes delivery of imported water through a single
connection that consists of a 1.5-mile, 8-foot diameter tunnel through the Santa Susana
Mountains, any interruption of service of that connection would require that the CMWD rely on
its own supply until restoration of the connection occurs.
Several formulas are available to establish reduced supply allocations. Options include: (1)
allocation proportional to historical deliveries; (2) allocation to achieve equal demand
reductions; and (3) allocations to achieve equal reductions from efficient demand. The IWOP
documents that an estimated minimum of a 50 percent reduction in system demand would be
necessary to navigate a 6-month outage event. Any implementation of supply allocation
reductions would occur together with a call to eliminate outdoor water use in order to preserve
finite supplies for health and safety purposes only, and include an aggressive public outreach
effort to inform end users of supply reduction circumstances.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 21 of 34
• Capital Improvement Projects
The CMWD’s website states that the District’s capital improvement projects are focused on the
rehabilitation and replacement of aging infrastructure, improvement of local water supply
reliability, and extension of the SMP to enable the development of local water supply projects.
The District’s FY 2022-23 adopted budget identifies a list of capital improvement projects,
categorized as follows including costs of $135,025,710 to fully implement the identified
projects: (1) Salinity Management Pipeline Phases 3 and 4 ($1,846,023), (2) Emergency Water
Supply Reliability ($104,366,687), (3) Improvements to Existing Facilities ($10,102,000),
(4) Rehabilitation, Replacement and Relocation ($16,911,000), and (5) Unplanned System
Repairs ($1,800,000). All capital improvement projects listed include figures related to total
dollar amount spent, budget requests ($0 in all cases), and remaining budget. A summary of
current capital improvement projects is provided below:
• Salinity Management Pipeline
The District is working to complete Phase 3 (i.e., approximately 27,000 lineal feet of 18- to 24-
inch pipeline from the intersection of Upland Road and Las Posas Road in Camarillo to Santa
Rosa Road and Hill Canyon Road in the Santa Rosa Valley) and Phase 4 (i.e., approximately
49,000 feet of 12- to 24-inch pipeline from the end of Phase 3 to the intersection of Tierra
Rejada Road and Madera Road in Simi Valley). The SMP Phase 3 and 4 extensions would
accommodate connection of additional dischargers to the SMP. Additionally, the District is
constructing a discharge station for metering and sampling of brine generated at the North
Pleasant Valley Groundwater Treatment Facility in the City of Camarillo.
• Emergency Water Supply Reliability
Planned capital improvements related to emergency water supply reliability include projects
described above in this report such as the interconnections involving the City of San
Buenaventura, the Las Virgenes Municipal Water District, and the Crestview Mutual Water
Company. In addition, the District is working to complete the following projects: (1) emergency
diesel generators and well rehabilitation to support the Las Posas ASR; (2) pumping
infrastructure to support the Grandsen Pump Station; (3) development of monitoring wells and
a groundwater model in support of the Las Posas ASR; (4) construction of a 6.5-million-gallon
concrete storage reservoir in eastern Simi Valley; and (5) installation of pumps at Lake Bard.
• Improvements to Existing Facilities
Improvement projects to support existing infrastructure include modifications and
replacements of equipment for the Oxnard-Santa Rosa Feeder, pipeline enhancements at the
Santa Susana Tunnel, modification and expansion of the existing crew building, and relocation
of the Networking Center near the Control Room.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 22 of 34
• Rehabilitation, Replacement, and Relocation
The District is implementing projects to replace and rehabilitate a variety of equipment for the
Conejo Pump Station, upgrade and updated programmable logic controllers throughout the
system, Lindero Pump Station No. 2 (also known as Toe of Dam or TOD Pump Station), Lake
Sherwood Pump Station, Lindero Pump Station, and Calleguas Conduit North Branch in the Simi
Valley Area.
• Unplanned System Repairs
Invariably, system and equipment issues will arise that will require prompt attention, including
emergency repairs to pumps, hydroelectric generators, wells, and general water distribution
components.
Water Master Plan
The 2017 Potable Water Master Plan Update, which replaced the 2006 Master Plan, includes a
comprehensive plan by which the CMWD can accommodate projected retail purveyor demands
and changing operating conditions, while continuing to provide a reliable water supply to its 19
purveyors. The Master Plan’s focus is the identification of potential infrastructure needs to
improve reliability and operational flexibility of the system during supply disruptions. The
Master Plan includes updates to the District’s facility inventory and data provided through
implementation of the Turnout Automation Project in 2011 (which provides real-time
monitoring and control of turnout flows related to service to the District’s purveyors).
The Master Plan includes an evaluation of existing and future water supplies and demands, and
the means to address future operational scenarios. A recommended capital improvement
contained in the Master Plan is the addition of a reservoir on the east end of Simi Valley to
accommodate 6 million gallons of storage, which would improve the ability for the District to
meet peak demands under both normal and high demand conditions. As a result of further
modeling, the project was modified and now includes 4.6 million gallons of total storage in two
2.3-million-gallon tanks. The estimated construction cost of $11.1 million is expected to be
funded through the District’s capital improvement project budget. Among the completed
projects that were recommended in the Master Plan are: (1) strengthening of the Moorpark
Feeder to modify the hydraulic grade to allow the Conejo Pump Station and Grandsen Pump
Station to operate near maximum capacities, (2) implementation of the Crestview
Interconnection Project, and (3) the preparation of a water supply alternatives study. The
District is currently focusing its efforts on strategic planning for local supply reliability and
development of projects as recommended in the WSAS.
Recycled Water Services
According to the 2020 UWMP, the District in 1990 adopted a resolution in support of reducing
demand for potable water by means of expanding use of recycled water. Specifically, “recycled
water shall be used, whenever feasible, to displace the use of potable water for new
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 23 of 34
construction landscape and turf irrigation.” The District provided recycled water at a wholesale
rate that is 80 percent of the potable rate. Currently, the District’s focus on support of recycled
water is in the form of operation of the SMP, which enables purveyors to develop their own
recycled water systems.
The District has been involved in several recycled water delivery projects, but does not treat
recycled water that it purchases and delivers to its customers:
• In the 1990s, the District constructed recycled water delivery systems within the Conejo
Valley. The District owned and operated recycled water systems in the Oak Park, North
Ranch, and Lake Sherwood areas using recycled water generated at the Tapia Wastewater
Treatment Plant that is owned and operated by the Las Virgenes Municipal Water District
and Triunfo Water & Sanitation District. The District’s recycled water customers consisted
of the Triunfo Water & Sanitation District, the California Water Service Company, and
Hidden Valley Municipal Water District. The District transferred the recycled water system
to the Triunfo Water & Sanitation District in 2017.
• Also in the 1990s, the District developed a recycled water system within Simi Valley. While
the CMWD provides recycled water produced at the Simi Valley Water Quality Control Plant
to Ventura County Waterworks District No. 8 (VCWD 8), it anticipates eventually
transferring ownership and operation of the system to VCWD 8, which is a dependent
district of the City of Simi Valley. In 2020, the CMWD provided 57 AF to VCWD 8, and
anticipates providing 80 AFY for the foreseeable future.
• In the 2000s, the CMWD, in partnership with the Camrosa Water District, developed
recycled water facilities for the Conejo Creek Diversion Project. The diversion structure,
draws flows generated primarily from treated effluent discharged from the City of Thousand
Oaks’ Hill Canyon Wastewater Treatment Plant and surface runoff from the Conejo Valley
and Santa Rosa Valley. The nonpotable surface water is used for nonpotable agricultural
and landscape irrigation purposes within the service areas of the Camrosa Water District
and the Pleasant Valley County Water District in lieu of groundwater pumping.
• From 2016 through 2020, the District conveyed treated wastewater from the City of Oxnard
Advanced Water Purification Facility to agricultural customers in lieu of groundwater
pumping. The water was conveyed through the District’s Salinity Management Pipeline
(SMP) (a pipeline designed to deliver treated wastewater to the Pacific Ocean, discussed
later in this report) to support agricultural irrigation efforts in the Oxnard Plain.
Waste Water Disposal Services
According to the District’s 2020 UWMP, the District owns and operates a regional Salinity
Management Pipeline (SMP) that collects brine (i.e., salty water, or “waste water” (distinct
from untreated sewage/“wastewater”)) generated by groundwater desalting facilities located
within the District’s service area, as well as excess recycled water (i.e., treated wastewater),
and conveys that water for beneficial reuse or safe discharge to the ocean, where natural salt
levels are higher.14 The CMWD does not generate waste water itself or treat the waste water it
14 Water Code Section 13050(d) provides, “’Waste’ includes sewage and any and all other waste substances, liquid, solid,
gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing,
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 24 of 34
collects; rather, it provides conveyance and disposal service only to waste water generators,
generally.
According to District staff, high groundwater salinity levels within the Calleguas Creek
Watershed limit use of groundwater as a local water source. Groundwater treatment processes
create a concentrated brine by-product that is unfit for discharge to the watershed or existing
sewer systems; therefore, the SMP was designed as an alternative means of conveying and
disposing of the brine that helps alleviate salinity within the watershed. The SMP supports use
of local groundwater resources and diversification of water supply within southeastern Ventura
County by creating new opportunities for development of groundwater treatment and
wastewater reuse facilities, which in turn encourages use of local water supplies to support
existing and future development.15 By creating a method for discharging salty water to the
ocean (instead of into the local watershed), the SMP creates opportunities for developing
groundwater treatment facilities that generate a salty by-product, as well as allowing
wastewater treatment facilities to discharge excess treated wastewater to the ocean.
The SMP extends from the Las Posas Valley (north of the City of Camarillo) approximately 14.5
miles to an ocean outfall in the City of Port Hueneme that terminates approximately ½ mile
from the beach into the sea (Figure 10, on the following page). Currently, the SMP accepts
waste water discharges from the Camrosa Water District’s Round Mountain Desalter, the City
of Oxnard, and the Port Hueneme Water Agency’s Port Hueneme Brackish Water Reclamation
Facility. The City of Camarillo’s North Pleasant Valley Groundwater Treatment Facility,
expected to come online in early 2023, will also discharge to the SMP. Extensions of the SMP
are planned to accommodate additional dischargers. Ventura County Waterworks District No.
1, which provides sewer services in and around the City of Moorpark, and the sewer treatment
plants of the cities of Thousand Oaks and Simi Valley are anticipated to eventually discharge
treated waste water to the SMP.
manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes
of, disposal.” The brine and water resulting from groundwater and sewer treatment processes that are/will be discharged into
the SMP appear to meet this definition. In fact, according to the 2002 Final Program EIR for the SMP, “a discharge of waste to a
water body” (emphasis added) is, in this case, subject to approval of a permit from the Los Angeles Region of the California
Regional Water Quality Control Board (page 4.5-10), which in 2014 issued Order R4-2014-0033 – “Waste Discharge
Requirements for Calleguas Municipal Water District Regional Salinity Management Pipeline.”
15 The District’s website contains educational information for the public on its website in the form of a SMP Brochure.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 25 of 34
Figure 10: Salinity Management Pipeline Facility Map (Source: 2020 CMWD UWMP)
The District has been authorized to provide waste water disposal services through the SMP
since 2019, when LAFCo approved the District’s request for activation of the latent power
pursuant to Government Code Section 56050.5. Notwithstanding LAFCo requirements, the
authorization for the District to provide waste water disposal service is contained in Chapter 3
(Other Functions) of Water Code Section 71670, and states that a municipal water district “may
acquire, construct, and operate facilities for the collection, treatment, and disposal of sewage,
waste, and storm water of the district and its inhabitants.”
The 2020 UWMP states that upon build-out, the SMP is expected to improve water supply
reliability through the development of approximately 40,000 AFY of new, local water supplies,
as a result of SWP vulnerability to drought, levee failures, and shutdowns of pumping facilities
for environmental reasons. Such support of local supply projects through the implementation
and expansion of the SMP is anticipated to reduce local reliance on imported water demands.
The District’s operation of the SMP complies with waste discharge requirements and a National
Pollutant Discharge Elimination System (NPDES) permit known as Order No. R4-2019-0075,
which must be renewed prior to its expiration date of July 31, 2024.
The CMWD FY 2018-19 budget documented capital improvement costs of nearly $16.5 million.
Capital improvement costs to date total approximately $140,945,000, and are expected to
reach $215,935,000 to accommodate all contemplated connections to the SMP. However, the
CMWD will not pursue large capital expenses to extend the pipeline until there are assurances
that additional desalters will be constructed by CMWD purveyors. CMWD staff states that
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 26 of 34
capital improvement costs of the SMP are expected to be recovered within 35 to 50 years,
depending on the number of dischargers that are connected to the SMP.
The District’s FY 2022-23 budget identifies $445,450 in total expenditures related to the SMP,
compared with $560,470 in FY 2021-22. It documents total expenditures during FY 2021-22
related to the SMP through March 2022 to be $1,128,790, and includes the “SMP Phase 3” (i.e.,
construction of approximately 27,000 lineal feet of 18-inch to 24-inch pipe from the
intersection of Upland Road and Las Posas Road in Camarillo to the intersection of Santa Rosa
Road and Hill Canyon Road in the Santa Rosa Valley), and “SMP Phase 4” (i.e., extension of the
SMP an additional 49,000 feet to Simi Valley to serve potential dischargers, potentially including
at least one groundwater desalter each in Simi Valley and Thousand Oaks, potable reuse at the
City of Simi Valley’s wastewater treatment plant, and Las Virgenes Municipal Water District and
Triunfo Sanitation District’s potable reuse facility). Revenues collected by the District related to
the SMP in the form of fees were $195,600 in FY 2021-22 and are estimated to be $631,880
during FY 2022-23.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 27 of 34
Sphere of Influence
The District’s sphere of influence reflects historical mapping errors that were recently
discovered as part of a mapping analysis conducted to compare the jurisdictional boundaries of
the CMWD with the MWDSC. As a result of the effort to improve the precision of the CMWD’s
jurisdictional boundaries, nine areas are recommended for modification to the sphere
(generally depicted below in Figure 11, and described in more detail in the staff report and
exhibits related to the recommended sphere of influence update (LAFCo 23-02S)). Each of the
identified areas A though I represents an area to be adjusted for one or more of the following
reasons: (1) align the sphere with the existing jurisdictional boundaries of the District, (2) align
the sphere with a city boundary, and/or (3) align the sphere with a city sphere of influence
boundary. In all cases, the modifications serve to make minor adjustments to the District’s
sphere to more closely match its jurisdictional boundary, to reduce the sphere where future
services are not anticipated, and to expand the sphere to include areas already within the
District’s jurisdictional area or within the public road right-of-way. The existing sphere of
influence boundary otherwise continues to reflect the District’s current and probable service
area.
Figure 11
Figure 11: CMWD Sphere of Influence Update
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 28 of 34
Written Determinations
The Commission is required to prepare a written statement of its determinations with respect
to each of the subject areas provided below (Government Code § 56430(a)).
1. Growth and population projections for the affected area
• Growth estimates for the District are estimated using data produced by the 2020-2045
Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) (adopted by
the Southern California Association of Governments in 2020). The 2020 Metropolitan
Water District of Southern California UWMP (June 2021) estimates the population
within the portion of its service area that lies within Ventura County (i.e., the area
within the CMWD service area) to be 630,000 as of July 2020. The 2020 Calleguas
Municipal Water District UWMP (June 2021), estimates a 2020 population of 644,441
and projects that the population will increase to 679,367 by 2030 and to 699,089 by
2040.
2. The location and characteristics of any disadvantaged unincorporated communities within
or contiguous to the sphere of influence
• A disadvantaged unincorporated community is defined as a community with an annual
median household income that is less than 80 percent of the statewide annual median
household income (Government Code § 56033.5). According to Ventura LAFCo
Commissioner’s Handbook Section 3.2.5, Ventura LAFCo has identified Nyeland Acres
(within the City of Oxnard’s sphere of influence to the north of the city), the Piru
community, and Saticoy (within the City of San Buenaventura’s sphere of influence to
the east of the city) as disadvantaged unincorporated communities. Of the three
identified disadvantaged unincorporated communities, only the community of Nyeland
Acres, which has a median household income of $42,043, is within the CMWD’s sphere
of influence (although it is outside the CMWD’s jurisdictional area). The Nyeland Acres
community receives fire protection services from both the Ventura County Fire
Protection District and the City of Oxnard under a mutual aid agreement, police
protection services from the Ventura County Sheriff’s Office, wastewater collection
services from Ventura County Service Area No. 30 (CSA 30), wastewater collection and
treatment from the City of Oxnard (through an agreement between CSA 30 and the City
whereby CSA 30 discharges to the City’s collection system), and water services from the
Garden Acres Mutual Water Company and Nyeland Acres Mutual Water Company.
3. Present and planned capacity of public facilities, adequacy of public services, and
infrastructure needs or deficiencies
Water Services:
• The District is a wholesale water provider that operates pursuant to the Municipal
Water District Law of 1911. It provides potable water within much of southern and
eastern Ventura County, including portions or all of the cities of Simi Valley, Moorpark,
Thousand Oaks, Camarillo, Oxnard, and Port Hueneme, and surrounding unincorporated
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 29 of 34
areas (e.g., Bell Canyon, Lake Sherwood, Oak Park, Santa Rosa Valley, Somis, and Naval
Base Ventura County), and serves a population of approximately 645,000.
• The District’s potable water supply is provided entirely by the Metropolitan Water
District of Southern California, which receives its water from the State Water Project
and through the Colorado River Aqueduct. The CMWD is the MWDSC’s regional
wholesale provider within Ventura County.
• The District imports water through a system of infrastructure. It operates and maintains
approximately 130 miles of major transmission pipelines that range from 14 inches to 78
inches in diameter, 12 enclosed reservoirs with a total storage capacity of approximately
59 million gallons, six pump stations, groundwater injection wells, pump and pressure
regulating stations, and hydroelectric generators.
• Imported water supply within the District was 89,630 AF in 2020. The 2020 UWMP
estimates a minimum combined water supply (imported water plus a minimal amount
of recycled water) to be 96,888 AF in 2022 and 88,248 AF in 2023. Supply is expected to
be 86,607 AFY by 2025, increasing incrementally into the foreseeable future, reaching
87,720 AFY by 2030, 89,880 AFY by 2035, 91,326 AFY by 2040, and 91,784 AFY by 2045.
• The District delivered 89,666 AF in 2017, 91,338 AF in 2018, and 82,236 AF in 2019, and
water demand within the District was 91,940 AF in 2020. The District anticipates
relatively stable imported water demand for the foreseeable future: 87,461 AFY by
2025, 88,585 AFY by 2030, 90,766 AFY by 2035, 92,227 AFY by 2040, and 92,689 AFY by
2045. These estimates include a constant 1,255 AFY of demand for replenishment
water (i.e., water used for injection into the District’s Las Posas Aquifer Storage and
Recovery facility and storage at Lake Bard).
• Based on information provided by the District and data available in its 2020 Urban
Water Management Plan, it appears that water supply is currently sufficient to meet
current potable water demand, and will remain so for the foreseeable future.
• The District owns Lake Bard (an earthen open-surface reservoir) and operates the Las
Posas Aquifer Storage and Recovery (ASR) Project. The lake has a storage capacity of
10,500 AF, of which 7,500 AF is available for treatment at the Lake Bard Water Filtration
Plant and distribution as potable water, and the remaining 3,000 AF may be used as
emergency non-potable supply. The Las Posas ASR Project accommodates both
injection of imported water into the Las Posas groundwater basin for storage of excess
water supply and extraction of stored water when regular water supply is unavailable.
In combination, water from Lake Bard and the Las Posas ASR comprised 1,729 AF during
2020, and is expected to total 1,255 AFY from 2025 into the foreseeable future (i.e., at
least through 2045).
• Peak capacity at the East Portal of the District’s Santa Susana Tunnel is 300 cfs. In 2021,
the District’s average day peak demand flow was 190 cfs, which totaled 378 AF for that
peak demand day.
• The District is involved in the development or exploration of a variety of projects in
support of improved water reliability, including the City of San Buenaventura State
Water Project Interconnection, the Calleguas Municipal Water District-Las Virgenes
Municipal Water District Interconnection, the Crestview Mutual Water Company
Interconnection, Los Angeles Department of Water and Power Interconnection, Las
Posas Aquifer Storage and Recovery Project, and Salinity Management Pipeline.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 30 of 34
• The District has developed a Water Shortage Contingency Plan (WSCP) in preparation
for potential reductions in imported water deliveries by the MWDSC resulting from
severe water shortage conditions or catastrophic interruption of water supply
conditions. The CWMD’s WSCP is closely tied to the contents of MWDSC’s WSCP, given
that the District is entirely reliant on the MWDSC for its water supply; however, the
CMWD is developing its own water shortage contingency measures. All measures
related to water shortage conditions assume continued reliance on (i.e., no catastrophic
failure of) the Santa Susana Tunnel. The District has established six levels of shortage
conditions and corresponding responses (e.g., required reduction in demand). Water
demand reductions for Shortage Levels 1 through 5 would be met by existing storage,
flexible supplies, voluntary demand reductions, and WSAP supply allocations. In
addition to the responses outlined for Shortage Levels 1 through 5, Shortage Level 6
involves potential prohibition of outdoor water use.
• The District’s WSCP includes a Water Supply Alternatives Study (WSAS), which is a
comprehensive planning effort that evaluates projects and programs that enhance
water supply reliability that focus on meeting water demands during an extended
outage of supplies from the MWDSC; and an Imported Water Outage Protocol (IWOP),
which details potential methodologies for supply allocation during a catastrophic
interruption of imported water.
• The CMWD’s website states that the District’s capital improvement projects are focused
on the rehabilitation and replacement of aging infrastructure, improvement of local
water supply reliability, and extension of the SMP to enable the development of local
water supply projects. The District’s FY 2022-23 adopted budget identifies a list of
capital improvement projects, categorized as follows including costs of $135,025,710 to
fully implement the identified projects: (1) Salinity Management Pipeline ($1,846,023),
(2) Emergency Water Supply Reliability ($104,366,687), (3) Improvements to Existing
Facilities ($10,102,000), (4) Rehabilitation, Replacement and Relocation ($16,911,000),
and (5) Unplanned System Repairs ($1,800,000).
Recycled Water Services:
• The District has been involved in several recycled water delivery projects, but does not
treat recycled water that it purchases and delivers to its customers. Currently, the
District provides recycled water generated at the Simi Valley Water Quality Control Plant
to Ventura County Waterworks District No. 8 in Simi Valley; however, it anticipates
eventually transferring ownership and operation of the system to VCWD 8. In 2020, the
CMWD provided 57 AF to VCWD 8, and anticipates providing 80 AFY for the foreseeable
future.
• Currently, the District’s focus on support of recycled water is in the form of operation of
the Salinity Management Pipeline (SMP), which enables purveyors to develop their own
recycled water systems.
Waste Water Disposal Services:
• The CMWD operates the regional SMP that collects brine generated by groundwater
desalting facilities and conveys that water for beneficial reuse or safe discharge to the
Pacific Ocean. The SMP supports use of local groundwater resources and diversification
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 31 of 34
of water supply within southeastern Ventura County by creating new opportunities for
development of groundwater treatment facilities, resulting in the encouragement of use
of local groundwater supplies to support existing and future development.
4. Financial ability of agencies to provide services
• The District prepares a comprehensive annual budget, and maintains a capital
improvement plan. It has a balanced budget and appears to have the ability to finance
the services it currently provides.
• The District is independently audited on a regular basis. According to the District, the
most recent audit (December 21, 2022) for FY 2021-2022 prepared for the District was
unqualified. An unqualified report reflects fair and transparent financial statements in
compliance with generally accepted accounting principles and statutory requirements.
• The District has a steady stream of revenue through water sales, capacity charges,
property taxes, and grants. It has predictable expenses including water purchases,
salaries and benefits, capital outlay costs, supplies/services, professional services, and
membership and dues. Over the last three years, the District has maintained reserves
ranging between 99 percent and 128 percent of total revenue.
• The District’s bond ratings are Aa2 (Moody’s) and AA (Standard and Poor’s), which
reflect that bonds issued by the District are generally considered to be safe investments,
and that the District has the ability to fulfill its financial obligations to its bond holders.
• Based on information that the Ventura County Special Districts Association provided the
County in January 2021, the District has experienced an estimated financial impact
(including costs related to personal protective equipment, sick leave,
custodial/sanitation activities, signage, education and enforcement, childcare, and
technology) of approximately $109,000, related to the coronavirus. The District covered
these costs through additional revenue obtained through higher-than-budgeted water
sales during that period.
5. Status of, and opportunities for, shared facilities
• The District is primarily responsible for wholesale water provision; therefore, its
operations are by nature closely tied to retail water purveyors within its service area,
and its activities have direct impacts on those agencies. For example, the District
participates in a Regional Water Conservation Rebate Program offered by the MWDSC,
which results in water use efficiencies throughout its service area and the service areas
of retail water agencies within its service area (e.g., turf replacement program).
• The District operates the Regional Salinity Management Pipeline, which is a conduit that
allows brine generated by groundwater desalting facilities and excess recycled water to
be discharged into the Pacific Ocean. Water discharged through the SMP is not
generated by the District; instead, the District enables discharge by other agencies and
users within the District’s boundaries. Operation of the SMP does not directly support
the District’s primary purpose to serve water; instead, it enables its retail water
providers to develop projects in support of local water reliability.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 32 of 34
• The District is involved with several projects to improve water supply reliability,
including interconnections with other water providers (e.g., City of San Buenaventura,
Las Virgenes Municipal Water District, City of Camarillo, and Crestview Mutual Water
Company).
• The District’s office contains a meeting space that can accommodate approximately 100
people for classes or other training purposes, and is amenable to coordinating training
events with other agencies.
6. Accountability for community service needs, including governmental structure and
operational efficiencies
• The District is accountable to its constituents through its elected Board of Directors,
adherence to applicable government code sections, open and accessible meetings, and
dissemination of information.
• Meeting notices are posted at the District’s office and on its website, and are sent to
purveyors and individuals who have requested notification.
• The District has adapted to the changing needs of public access as a result of the disease
caused by the novel coronavirus (COVID-19) pandemic, by providing live internet access
and public participation opportunities for its meetings.
• The District maintains a website that provides detailed information about the District. It
contains the District’s history, mission, summary of services, budget, boundary map,
studies and reports, contact information and roster of current Board members, meeting
agendas and minutes for the current year, upcoming meeting information, news and
announcements, current project information, and educational videos. The District could
improve its transparency by maintaining historical budgets, meeting agendas, and
meeting minutes on its website, by posting its enabling legislation, financial audit
documents, and the State Controller’s “By the Numbers” (agency financial reporting
information) and “Public Pay” (employee salary) webpages, by recording and archiving
Board meetings to be available on the District’s website, and by adding a Spanish
translation feature to its web content.
• The District has prepared a Water Shortage Contingency Plan that spells out the
District’s planned actions during water shortage conditions. The District plans to
schedule meetings with individual purveyors to simulate various outage scenarios.
• The District sponsors and/or coordinates outreach programs intended to increase public
awareness of water resource issues and encourage water use efficiency, including: (1)
hosting semi-annual native plant sales and rain barrel sales, (2) hosting and participating
in workshops to promote drought-friendly landscaping and turf alternatives, graywater
and rainwater capture, and drip irrigation, (3) presenting on water resource matters to
political bodies and community and service organizations, (4) maintaining a social media
presence, and (5) frequently publishing advertisements in local newspapers regarding
the availability of consumer rebates for water-saving devices. Information regarding
MWDSC’s water saving and efficiency programs is available at bewaterwise.com.
• The District participates in the California Water/Wastewater Agency Response Network
WARN (CALWARN) program (which supports and promotes statewide emergency
preparedness, disaster response, and mutual assistance processes for public and private
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 33 of 34
water and wastewater utilities in coordination with the State Office of Emergency
Services), the Association of California Water Agencies Joint Powers Insurance
Authorities (which provides insurance coverage, training programs, and other practical
resources for public water agencies), and the Calleguas-Las Virgenes Public Financing
Authority (which allows the District to consolidate financing of capital projects with the
Las Virgenes Municipal Water District to achieve lower borrowing costs).
• The Ventura County Grand Jury released a document entitled Final Report –
Independent Special Districts (April 26, 2018), which was the result of an investigation
by the Grand Jury into the transparency and public accountability of independent
special districts within the County. The Grand Jury identified opportunities for
improvement in these subject areas and required a response from the District. The
District’s response stated that expanded information is now available on the District’s
website, as a result of the report.
• District staff was responsive in providing information for this MSR during the requested
timeframe.
7. Any other matter related to effective or efficient service delivery, as required by
Commission policy
• The Sustainable Groundwater Management Act (SGMA) of 2014 requires the formation
of local groundwater sustainability agencies (GSAs) for high- or medium-priority water
basins, as determined by the state. GSAs are required to evaluate local water basin
conditions and develop groundwater sustainability plans (GSPs). The purpose of a GSP
is to define sustainability for an individual basin and establish a path toward
sustainability by 2040 for high-priority basins, and 2042 for medium-priority basins. A
summary of the GSPs prepared for high-priority basins within the District’s jurisdictional
boundaries is provided below.
• The Las Posas Basin is listed as a high-priority basin, pursuant to the State Department
of Water Resources (DWR). The Fox Canyon Groundwater Management Agency is the
GSA for all areas of the Las Posas Basin except for the portion located within the
jurisdictional area of the Camrosa Water District. The Fox Canyon Groundwater
Management Agency (FCGMA) adopted a GSP for the entire Las Posas Basin in
December 2019, which was approved by the DWR on January 13, 2022.
• The Oxnard Subbasin is listed as a high-priority basin, pursuant to the DWR. The
FCGMA, the Camrosa Water District-Oxnard Subbasin GSA, and the Oxnard Outlying
Areas GSA have jurisdiction over different portions of the Subbasin. The FCGMA
adopted a GSP for the entire Subbasin in December 2019, which was approved by the
DWR on November 22, 2021.
• The Pleasant Valley Basin is listed as a high-priority basin, pursuant to the DWR. The
FCGMA, County of Ventura, Camrosa Water District have jurisdiction over different
portions of the Subbasin. The FCGMA adopted a GSP for the entire Subbasin in
December 2019, which was approved by the DWR on November 22, 2021.
Calleguas Municipal Water District – Municipal Service Review
March 15, 2023
Page 34 of 34