The 2016-17 Budget: Governor’s General Fund Deferred Maintenance Proposal
Read the report at Legislative Analyst's Office ↗
The 2016-17 Budget:
Governor’s General Fund
Deferred Maintenance Proposal
MAC TAYLOR • L E G I S L A T I V E A N A L Y S T • FEBRUARY 2016
Summary
The Governor’s budget proposes $500 million from the General Fund to address deferred
maintenance backlogs in state facilities managed by various departments. The Governor’s budget
proposal does not identify the specific projects the departments would undertake with the proposed
funding. Instead, it requires that project lists be provided to the Joint Legislative Budget Committee
(JLBC) prior to the allocation of the funds.
We find the Governor’s deferred maintenance proposal addresses an important state need.
However, we also find that it raises several issues for legislative consideration. Specifically, we find
that it lacks critical details, fails to address the underlying causes of the state’s deferred maintenance
backlog, and proposes a process for identifying deferred maintenance projects for funding that is
inadequate.
Accordingly, we recommend (1) requiring lists of proposed projects to be funded by each
department by April 1, 2016; (2) requiring individual departments to report at budget hearings on
the underlying causes of their backlogs and their plans to address their backlogs; (3) modifying
departments’ funding levels based on reviews of the lists of proposed projects; and (4) requiring that
funded projects be listed in the Supplemental Report of the 2016-17 Budget Package.
BACKGROUND
Defining Deferred Maintenance. Facilities the amount of deferred maintenance is often
require routine maintenance and repair to keep complicated because departments vary in what
them in acceptable condition and to preserve and types of activities they consider maintenance.
extend their useful lives. When such maintenance For example, some departments include as
is delayed or does not occur, we refer to this as maintenance projects that are not traditionally
deferred maintenance. Defining and estimating considered as such—for example, energy and
2016-17 BUDGET
water efficiency upgrades, studies, and code (such as by holding maintenance positions vacant),
compliance work. In contrast, other departments or poor facility management practices.
do not include such activities when identifying Deferred Maintenance Funding Provided in
maintenance projects. 2015-16. As shown in Figure 2, the 2015-16 Budget
State Has Large Deferred Maintenance Act included Control Section 6.10, which provided
Backlog. The Governor’s budget and the associated $120 million in one-time, non-Proposition 98
five-year infrastructure plan identify total state General Fund support for addressing deferred
infrastructure deferred maintenance needs of maintenance in various departments. The
$77 billion, as shown in Figure 1. Of this total, 2015-16 Budget Act also provided $148 million in
$57 billion (74 percent) is related to the state’s Proposition 98 funds for deferred maintenance
transportation system. Deferred maintenance can projects and certain other one-time purposes at
be caused by various factors, including insufficient the California Community Colleges (CCC), and
funding for ongoing maintenance, diverting Chapter 1 of 2015 (AB 91, Committee on Budget)
maintenance funding to other operational purposes provided $2 million from the General Fund for
deferred maintenance at the California Department
Figure 1 of Forestry and Fire Protection (CalFire).
Administration’s Identified Deferred As proposed by the Governor, Control
Maintenance Needs in 2016-17
Section 6.10 of the 2015-16 Budget Act did not
(In Millions) identify the specific projects that departments
Department/Program Amount would undertake with the proposed funding.
Transportation $57,000 Instead, the budget required that for each entity
Water Resources 13,100 receiving deferred maintenance funds, the
Judicial Branch 2,087
University of California 1,221
Parks and Recreation 1,150
Figure 2
Corrections and Rehabilitation 1,029
General Fund (Non-Proposition 98) Deferred
Community Colleges 504
Developmental Services 378 Maintenance Funding in 2015-16 Budget
Military 239
(In Millions)
State Hospitals 154
General Services 135 Department/Program Amounta
California State University 92
University of California $25
California Fairs 89
California State University 25
Highway Patrol 49
Parks and Recreation 20
Veterans Affairs 36
Corrections and Rehabilitation 15
Motor Vehicles 31
Developmental Services 7
Fish and Wildlife 21
State Hospitals 7
Forestry and Fire Protection 18
California Fairs 7
State Special Schools 10
General Services 5
Science Center 10
Emergency Services 3
Hastings College of Law 8
Military 2
Emergency Services 3
Veterans Affairs 2
Conservation Corps 1
Food and Agriculture 2
Food and Agriculture <1
Total $120
State Conservancies/Wildlife <1
a
Conservation Board Does not include $2 million in one-time General Fund for California Department of
Forestry and Fire Protection deferred maintenance projects that was included in
Total $77,364 Chapter 1 of 2015 (AB 91, Committee on Budget).
2 Legislative Analyst’s Office www.lao.ca.gov
2016-17 BUDGET
Department of Finance (DOF) provide a list of In July 2015, the administration officially provided
projects to the JLBC 30 days prior to allocating a list of projects to be funded from Control
those funds. The budget further required DOF to Section 6.10. Since then, the administration has
notify the JLBC quarterly of any changes to the notified the JLBC of several changes to the projects
approved list of projects. The budget also specified proposed for funding.
that expenditures must be made by June 30, 2017.
GOVERNOR’S PROPOSAL
$500 Million for Deferred Maintenance. The
Figure 3
Governor’s budget proposes Control Section 6.10,
General Fund (Non–Proposition 98) Deferred
which provides $500 million in non-Proposition 98 Maintenance Proposal for 2016-17
General Fund to various entities for deferred
(In Millions)
maintenance as shown in Figure 3. (The
Department/Program Proposed Amount
Governor’s budget also includes $289 million
Water Resources $100
from Proposition 98 funds for CCC for deferred
State Hospitals 64
maintenance and certain other one-time expenses, Judicial Branch 60
Parks and Recreation 60
as well as $18 million from the Motor Vehicle
Corrections and Rehabilitation 55
Account for deferred maintenance needs at the
California State University 35
California Highway Patrol and Department of University of California 35
Developmental Services 18
Motor Vehicles.) Consistent with the Governor’s
Military 15
approach in 2015-16, the proposed 2016-17
Fish and Wildlife 15
budget does not identify the specific projects that General Services 12
departments would undertake with the proposed Forestry and Fire Protection 8
Veterans Affairs 8
funding. Instead, the budget requires DOF to
California Fairs 4
provide a list of projects to the JLBC 30 days prior State Special Schools 4
to allocating funds to a department. Subsequent to Science Center 3
Hastings College of Law 2
the allocation of funds, departments may change
Emergency Services 1
their list of projects subject to approval by DOF. Conservation Corps 1
The budget requires DOF to notify the JLBC Food and Agriculture <1
State Conservancies/Wildlife <1
quarterly of these changes, but does not provide the
Conservation Board
JLBC with a 30-day review period. Total $500
LAO ASSESSMENT
Governor’s Focus on addressing the state’s substantial accumulated
Deferred Maintenance Is Positive backlog of deferred maintenance. Furthermore,
we find that the additional, substantially larger,
We find that the deferred maintenance funding
amount of deferred maintenance funding
provided in 2015-16 was a good first step towards
www.lao.ca.gov Legislative Analyst’s Office 3
2016-17 BUDGET
proposed for 2016-17 represents another important No Clear Methodology for Establishing
contribution towards addressing this large backlog. Funding Levels. We find that the administration
The state has invested many billions of dollars in has not provided a clear rationale for why the
its infrastructure assets, which play critical roles in proposed funding levels were selected. Based
the state’s economy. Moreover, when repairs to key on our discussions with the administration, we
building and infrastructure components are put understand that they considered various factors
off, facilities can eventually require more expensive when allocating deferred maintenance funding to
investments, such as emergency repairs (when departments, such as the amount of departments’
systems break down), capital improvements (such identified needs and the amount of funding
as major rehabilitation), or replacement. Thus, provided to departments in 2015-16. However, it
while deferring annual maintenance lowers costs in is not clear how these and other considerations
the short run, it often results in substantial costs in were ultimately weighed to arrive at the proposed
the long run. funding amounts for departments. We note, for
example, that the proposal includes sufficient
Additional Details Warranted
funding to cover all of the identified needs at
While the Governor’s proposal addresses an several departments, such as the Department of
important state need, we find that the Governor’s Food and Agriculture, the California Conservation
proposal lacks critical details that would allow Corps, and the State Conservancies. In contrast,
the Legislature to evaluate the specific funding the proposal funds about 5 percent of the
allocations and understand how deferred needs identified by the Department of Parks
maintenance funding is affecting the accumulated and Recreation and California Department of
backlog. Corrections and Rehabilitation. Differing funding
Limited Information on Proposed Projects. levels may make sense to the extent they reflect
The administration has identified projects that differing levels of need, severity of need, or
make up each department’s list of deferred priorities. However, the Governor’s proposal does
maintenance needs. However, the administration not provide such clear justification. In fact, based
has not provided lists of specific projects that are on the list of each department’s identified needs
proposed for funding under Control Section 6.10. as provided by the administration, it appears the
The absence of an identification of specific projects budgeted funding levels would be sufficient to fund
makes it difficult for the Legislature to evaluate some very low priorities in some departments—
whether projects will address the highest state such as new carpets and interior painting at the
priorities. For example, the Legislature may wish to California Conservation Corps—while other
prioritize funding certain types of projects—such departments might have fire, life, and safety
as those that address fire, life, and safety issues projects and projects that maintain the integrity
or reduce future state costs—over other types of and longevity of buildings unfunded.
projects—such as those that address aesthetic Lack of Analysis of Other Potential Funding
concerns or that could potentially be funded Sources. It is unclear whether some projects
through other sources. However, without lists of identified by the administration as deferred
specific projects, the Legislature cannot assess maintenance needs could be funded by other
whether the funding provided will go to projects sources rather than the General Fund—such as
that meet those or other legislative priorities. user fees, federal funds, or donations. For example,
4 Legislative Analyst’s Office www.lao.ca.gov
2016-17 BUDGET
energy efficiency projects identified as deferred 2016-17 even though these departments received
maintenance needs by some departments such funding for deferred maintenance in 2015-16.
as the Office of Emergency Services and the Meanwhile, the identified deferred maintenance
Department of Veterans Affairs might be able need at CalFire declined by over $100 million—from
to be funded by cap-and-trade auction revenues $126 million to $18 million—when only $2 million
or various state revolving fund programs (where was provided to address the department’s backlog in
project costs are recouped over time through the the 2015-16 Budget Act.
project’s energy savings). In many cases, it is unclear what drove these
Unclear Why Deferred Maintenance Backlog substantial changes in the identified backlogs.
Has Changed Over Time. As shown in Figure 4, the Specifically, it is uncertain whether these
administration’s identified deferred maintenance changes reflect actual differences in needs since
backlog has changed substantially since 2015-16. last year or are a result of differences in how
For example, the identified needs for the California deferred maintenance is catalogued or reported
Military Department and the Department of State by departments. It is important to understand
Hospitals more than doubled between 2015-16 and what is leading to these—in some cases very
Figure 4
Changes in the Administration's Identified Backlog for Selected Departments
Department and Year
2015-16
Military
2016-17
2015-16
State Hospitals
2016-17
2015-16
General Services
2016-17
2015-16
California Fairs
2016-17
2015-16
Veterans Affairs Identified Unfunded Need
2016-17
Funding
2015-16
Fish and Wildlife
2016-17
Forestry and 2015-16
Fire Protection 2016-17
State Special 2015-16
Schools 2016-17
2015-16
Science Center
2016-17
50 100 150 200 250 $300
(In Millions)
www.lao.ca.gov Legislative Analyst’s Office 5
2016-17 BUDGET
large—changes to identified backlogs because it Notification Process for Projects Is Inadequate
may point to different legislative responses. To the
As discussed above, the Governor’s proposal
extent that changes in backlogs represent actual
does not require the identification of specific
differences in accumulated needs since last year,
projects prior to passage of the budget or prior
they can provide useful information on how much
to changing the approved project lists. Instead,
departments’ current maintenance programs are
Control Section 6.10 includes a JLBC notification
affecting backlogs. For example, if a department
process. This approach raises a few concerns. First,
experienced a large increase in its backlog since last
the process would identify projects proposed for
year, it might suggest that its routine maintenance
funding after the Legislature has made its decisions
activities are insufficient to keep up with its annual
on the budget. This would divorce decision
needs and that it should improve its maintenance
making on the amount of funding provided to
program to prevent the further accumulation of
each department from the set of projects to be
deferred maintenance. However, to the extent that
funded. As a result, the funding amounts might
the changes in reported need levels are a result
not correspond with the projects that would be
of differences in reporting methodologies, the
prioritized by the Legislature. Second, the proposed
information on these reported backlogs might
JLBC process provides the Legislature with much
not be sufficiently reliable to inform decision
less time to review proposed projects than the
making about how to most appropriately address
traditional budget process and is less transparent
a department’s deferred maintenance challenges
to the public. For this reason, the JLBC process is
and might instead point to the importance of
typically reserved for minor, midyear changes to
improved facility condition assessments or other
the budget rather than for the initial identification
data collection.
of projects proposed for funding. Third, the
proposed process to allow the administration to
Plan Does Not Address
move forward with changes to funded projects
Causes of Deferred Maintenance
without legislative approval would diminish the
Providing one-time funding is only a
Legislature’s control over how funds are spent and
short-term response to the underlying problem—
could result in the funding of projects that are not
the failure to consistently maintain state assets
consistent with legislative priorities.
on an ongoing basis. The administration does not
The 2015-16 process highlights some of the
include an assessment of, or a plan to address, the
challenges associated with the administration’s
underlying causes of the accumulation of deferred
proposed approach. Specifically, one of the projects
maintenance. Without such a strategy, there is no
that the administration proposed to fund under
certainty that departments will have the necessary
Control Section 6.10 of the 2015-16 Budget Act—the
tools or other resources to address the underlying
replacement or retrofitting of the existing boilers at
causes of their deferred maintenance backlogs.
Porterville Developmental Center—had previously
A strategy for preventing the accumulation of
been rejected by the Legislature. While the
new deferred maintenance projects is essential
administration ultimately did not move forward
to ensuring that the problem does not get worse.
with this project after the JLBC expressed concerns,
Moreover, the administration has not identified a
the Control Section 6.10 process—with its lack of
long-term plan for working through the rest of the
time for review and more limited transparency—
deferred maintenance backlog.
made it more challenging to ensure that this type
6 Legislative Analyst’s Office www.lao.ca.gov
2016-17 BUDGET
of project was identified and removed from the initial list of projects), the administration would
administration’s plan for funding. Furthermore, not have been required to provide the Legislature
if this project had been proposed to replace an with any opportunity to review the change prior to
approved project (rather than being included on the proceeding with the project.
LAO RECOMMENDATIONS
Require Additional Reporting Furthermore, we recommend that the Legislature
seek information on whether the administration
Require Lists of Proposed Projects. We
has a longer-term plan to (1) address accumulated
recommend that the Legislature require the
deferred maintenance backlogs and (2) ensure that
administration to provide lists of specific projects
appropriate ongoing maintenance is sustained so
that would be funded by each department. These
that deferred maintenance does not continue to
lists are critical for the Legislature to have in
accumulate.
order to assess whether the proposed projects
are consistent with its priorities and whether the
Adjust Funding Levels
funding allocations are appropriate. In order to
Based on Review of Project Lists
enable the Legislature to consider the lists during
Once the Legislature receives lists of projects
its budget deliberations, we recommend the
from departments, we recommend that it review
administration provide the required information
these lists to determine if the proposed funding
by April 1, 2016.
levels and projects are consistent with its General
Require Individual Departments to Report
Fund priorities. As it conducts its reviews, the
at Budget Hearings. We recommend that the
Legislature might wish to consider various factors,
Legislature use its budget hearings to gather
including whether the projects address critical
more information from the administration
program needs, reduce state liability, and prevent
and individual departments. In particular, we
higher future costs. If the Legislature is comfortable
recommend the Legislature seek information from
with these lists, we recommend that the Legislature
departments on other potential sources of funding
approve them as proposed. However, if the lists
that could be available to support the proposed
include projects that it deems to be of lower
projects. This could allow the proposed General
priority—such as those that address aesthetic
Fund resources to support a greater number of
issues or could be funded from other sources—we
projects overall. In addition, we recommend
recommend that the Legislature adjust the funding
that the Legislature seek information from the
levels proposed for departments accordingly.
administration regarding why the backlog for
Finally, if departments are unable to provide project
specific departments has changed over time and
lists by April 1, 2016 or are unable to justify their
what factors led to the accumulation of deferred
proposed projects to the Legislature’s satisfaction,
maintenance. This information would enable
we recommend that the Legislature reject the
the Legislature to better assess the nature of
administration’s proposed funding for those
the backlog and assist it in crafting policies to
specific departments.
ensure that departments effectively manage their
maintenance programs on an ongoing basis.
www.lao.ca.gov Legislative Analyst’s Office 7
2016-17 BUDGET
Require Funded Projects Report of the 2016-17 Budget Package. We
Be Listed in Supplemental Report recognize that there will likely be some instances
when departments have reasonable rationales for
Because we recommend that departments be
changing the projects on their proposed lists after
required to provide lists of proposed projects by
the budget is adopted. Therefore, we recommend
April 1, 2016 and that the Legislature reject funding
including control section language that allows
for departments that fail to provide these lists, we
departments to modify their proposed lists.
find that the proposed language requiring a report
However, we recommend that the control section
to JLBC prior to allocating funds is unnecessary.
language require that these changes occur no
Instead, we recommend that all projects approved
sooner than 30 days after notifying the JLBC.
by the Legislature be included in the Supplemental
LAO Publications
This brief was prepared by Helen Kerstein and reviewed by Brian Brown. The Legislative Analyst’s Office (LAO) is a
nonpartisan office that provides fiscal and policy information and advice to the Legislature.
To request publications call (916) 445-4656. This brief and others, as well as an e-mail subscription service,
are available on the LAO’s website at www.lao.ca.gov. The LAO is located at 925 L Street, Suite 1000,
Sacramento, CA 95814.
8 Legislative Analyst’s Office www.lao.ca.gov