A Review of the State's Active Transportation Program
Read the report at Legislative Analyst's Office ↗
A Review of the State’s
Active Transportation Program
GABRIEL PETEK
LEGISLATIVE ANALYST
MARCH 1, 2019
Summary
The state’s Active Transportation Program—administered by the California Transportation Commission
(CTC), in coordination with the California Department of Transportation (Caltrans)—provides funding to
infrastructure and non-infrastructure projects that facilitate travelers being physically active through biking
and walking. Some of the primary goals of the program include increasing the number of walking and
biking trips, increasing safety and mobility, and enhancing public health. In approving the 2018-19 budget
package, the Legislature directed our office to review certain aspects of the program, such as the types of
projects funded from the program and the extent to which funded projects are located in and directly benefit
disadvantaged communities. This report responds to that requirement.
Based on our review of the program and data currently available on project outcomes, we find that most
program funding supports infrastructure projects, such as constructing sidewalks, bike lanes, and crossing
signals. The projects funded are similar across various components of the program and most projects
benefit disadvantaged communities. We also find that it is impossible to determine key program outcomes,
such as whether the program is resulting in increased walking and biking and improved safety. This is
because accurate information is not reported on these outcomes. In view of our findings, we recommend
that the Legislature require the CTC and Caltrans to collect more accurate project outcome data. We also
recommend that the Legislature consider focusing the statewide component of the program on larger
and more transformative projects and consider providing additional flexibility to Metropolitan Planning
Organizations (MPOs) for their regional component of the program.
INTRODUCTION
Active transportation includes walking, biking, and congestion; and increased transit ridership by facilitating
other active or “human-powered” ways that people get connections to and from transit stations.
from one place to another. In recent years, the state has In 2013, the state established the Active
taken steps to improve the infrastructure for this type Transportation Program (ATP) by consolidating several
of transportation due its many potential benefits. Such existing state and federal programs related to walking
benefits include improved health for travelers; reduced and biking, in order to provide greater flexibility in meeting
vehicle trips and the resulting reduction in greenhouse the state’s active transportation needs. In 2017, the state
gas (GHG) emissions and air pollution; reduced traffic increased the level of funding for the ATP by $100 million,
analysis full
gutter
AN LAO REPORT
bringing total annual funding for the program to of projects funded from the program; (2) identify
$220 million. After roughly five years since the the extent to which funded projects are located in
creation of the ATP, the Legislature has requested a and directly benefit disadvantaged communities,
status update of the program in order to determine as well as benefit the state highway system;
if the program is meeting its intended goals and (3) discuss any implementation challenges faced
whether any changes to the program are warranted. by project sponsors; (4) review the administration
Specifically, as part of the 2018-19 budget package, of the program; and (5) make recommendations for
the Legislature adopted supplemental report improving the program’s effectiveness. This report
language directing our office to (1) review the types responds to the supplemental report language.
BACKGROUND
The state has placed a greater focus in recent • Increase Number of Walking and Biking
years on alternatives to driving, such as increasing Trips. This goal could be achieved through
the number of trips taken via active transportation a mode shift where travelers utilize active
and utilizing active transportation modes to transportation modes for some trips that
facilitate connections to public transit. In order to would have otherwise required driving.
support this increased focus on active modes of Additionally, increased walking and biking
transportation, the state established the ATP. trips could also result if travelers choose to
Various Programs Consolidated to Establish take additional trips due to the availability of
ATP in 2013. As part of 2013-14 budget, the additional options for walking or biking.
Governor proposed and the Legislature approved, • Increase Safety and Mobility. Given the
a consolidation of three programs—Transportation inherent danger with pedestrians and
Alternatives Program, Bicycle Transportation bicyclists sharing roadways with vehicles, a
Account, and Safe Routes to Schools—into the large share of traffic-related fatalities involve
ATP. These programs generally funded small grants travelers who walk and bike. The ATP is
for projects such as improving sidewalks and intended to fund projects that improve safety
crosswalks near schools and constructing bicycle and make walking and bicycling a safe
lanes. The rationale for consolidating the programs alternative to driving.
was to provide greater focus on the importance of • Reduce GHG Emissions. A secondary
active transportation projects, increase the state’s benefit of having more people travel via active
role in setting active transportation priorities, and transportation modes is a reduction in GHG
potentially allow for the funding of larger and more emissions.
transformative projects to increase walking and
• Enhance Public Health. Another secondary
biking.
benefit of having more people travel via active
Current state law designates CTC as the transportation modes is an improvement in
administering agency for the ATP, in coordination public health.
with Caltrans. The ATP provides funding to
• Benefit Disadvantaged Communities. Under
project sponsors (such as local jurisdictions
existing state law, the program must provide
and school districts) for both infrastructure and
a minimum of 25 percent of funds to projects
non-infrastructure projects proposed (such as bike
that benefit disadvantaged communities.
safety courses and education campaigns).
• Benefit Many Types of Active
Various Program Goals. The authorizing
Transportation Users. This goal ensures
legislation for ATP—Chapter 359 of 2013 (SB 99,
the program focuses on various potential
Committee on Budget and Fiscal Review)—
active transportation modes, such as walking,
established six goals for the program to achieve.
biking, and the use of scooters.
These goals include:
2 LEGISLATIVE ANALYST’S OFFICE
analysis full
gutter
AN LAO REPORT
Program Funding Sources and Allocations. $250,000. To compete for funding, project sponsors
Initially, the ATP received about $120 million must complete an application and submit it to the
annually in federal funds and State Highway CTC. The first step in evaluating the applications
Account funds that had previously been dedicated is for Caltrans to screen the applications to ensure
to the individual programs that were consolidated eligibility. The CTC then uses about 100 volunteers
to create the ATP. The passage of Chapter 5 of to evaluate each eligible project and give the project
2017 (SB 1, Beall)—a comprehensive transportation a score based on the approved scoring guidelines.
funding package—provides an additional CTC staff also evaluate and score projects as a way
$100 million to the ATP for total program funding of ensuring consistency in the scoring of projects
of about $220 million annually. We note that the across the various volunteer teams. However, the
program received $10 million in one-time funding in scores given by the volunteer teams are the official
2016-17 from cap-and-trade auction revenues. scores. Once all projects are evaluated and given
Under current law, the ATP has three distinct a score, they are ranked from highest scoring
program components to ensure a certain level of to lowest scoring, and projects for each of the
geographic distribution of funds and allow different program components are selected as follows:
entities to have a role in selecting projects and
• Statewide Component. CTC staff select
determining active transportation priorities. The
projects for the statewide component
specific funding allocations are:
starting with the highest scoring project and
• 50 percent to the statewide component of the continuing down the list until all of the funding
program with projects selected by the CTC in for the statewide component of the program
any region of the state. is allocated to projects. The CTC does not
require that project sponsors providing
• 40 percent for projects selected by MPOs.
matching funds.
(The funding for projects selected by MPOs is
allocated among the state’s 18 MPOs based • Small Urban and Rural Component. CTC
on population.) also selects the projects for the small urban
and rural component of the program. After
• 10 percent for projects in small urban and
selecting the highest scoring projects for the
rural regions.
statewide component, CTC staff will continue
Program Administration and Project Selection. down the list of projects to identify the next
As the administering entity for the program, CTC highest scoring set of projects that are in a
adopts program guidelines, develops project small urban or rural region.
scoring criteria, receives and approves requests
• MPO Component. After determining the
to allocate funding for specific phases of projects
statewide and small urban and rural projects,
in the program, and works with project sponsors
the remaining projects that are located in an
to ensure projects are implemented as planned.
MPO are available to compete for funding in
The CTC has a role in administering the entire ATP
the MPO component of the program. Each
program, including the MPO and small urban and
MPO can either use the CTC’s scoring criteria
rural components of the program. (We note that the
or their own guidelines and scoring criteria,
Governor’s 2019-20 budget provides two additional
which can include the requirement that project
positions to CTC for the administration of ATP and
sponsors provide matching funds. Based on
another program administered by CTC.)
approved scoring criteria, each MPO will then
The current CTC program guidelines require all select the next highest scoring projects for
project sponsors seeking ATP funding to apply funding from its share of funding for the MPO
for funding through the CTC by first competing component of the program.
for funding in the statewide component of the
Several Project Selection Cycles Have
program. The CTC puts out a call for projects
Occurred. Since the program’s inception, three
in funding cycles that occur every year or two.
cycles of selecting projects and awarding funds
The minimum project size eligible for funding is
www.lao.ca.gov 3
analysis full
gutter
AN LAO REPORT
have been completed. In addition, a fourth cycle of reports are intended to track whether projects
project selection is currently underway. In January are being completed as planned and on time and
2019, the CTC approved projects to receive funding within budget. The project completion reports
from this fourth cycle for the statewide and small should also include before and after bicycle and
urban and rural components of the ATP. MPOs are pedestrian counts, if applicable, to measure the
currently evaluating the remaining applications for potential change in walking and biking as a result
projects within their regions to select the projects of the project. Bicycle and pedestrian counts are
to receive funding from the MPO component of performed by counting the number of bicyclists and
the fourth cycle. These funding cycles each cover pedestrians using a particular active transportation
a multiyear period such that funding is awarded to facility (such as a sidewalk or bike lane). These
projects for multiple years in each cycle. counts can be performed in a variety of ways, such
Required Reporting on Project Completion as manual counting or surveying a community (such
and Benefits. Project sponsors are required as a school) about how frequently individuals walk
to submit semiannual reports to Caltrans and or bike. Based on the information in the progress
CTC on the progress of the project. In addition, reports and project completion reports, Caltrans
project sponsors are required to submit a project publishes a periodic status report on the ATP. The
completion report within six months of the most recent Caltrans status report was published in
project’s completion. The project completion December 2018.
FINDINGS
For the first three funding cycles, along with the to develop plans for improving active transportation
statewide and small urban and rural components within specific communities.
of the fourth funding cycle, a total of 776 active State, MPO and Rural Program Components
transportation projects were programmed, as Funding Similar Types of Projects. In general, the
shown in Figure 1. In total, these projects were state, MPO and small urban and rural components
awarded $1.6 billion in ATP funding to fund a of the program appear to be funding the same
portion of the estimated $3 billion in total project general types of projects. For example, most of the
costs. (The remainder of project funding comes projects, regardless of project component, involve
from other sources, such as local funds.) The infrastructure improvements to benefit bicyclists
total amount of funding awarded is higher than and pedestrians. Common types of projects across
the amount of funding that has been available to all components are projects that provide safer
the program thus far because it includes funding pedestrian access to schools and close gaps in
for planned projects in future years. Below, we existing bicycle and pedestrian corridors. The
provide information on the types of projects funded, average cost of the projects and average ATP grant
benefits achieved, and implementation challenges. awards are all similar across the three components
of the program, which we discuss in more detail
Types of Projects
below.
Most Projects Are Infrastructure Projects Are Small, but Appear to Be Getting
Improvements. Of the 776 total projects, Larger. In the first funding cycle, the average ATP
584 projects (75 percent) are infrastructure grant award was $1.3 million and the average total
projects, such as constructing bicycle lanes and project cost for those projects was about $4 million.
sidewalk improvements. Additionally, 136 projects The size of the average grant award has increased
(18 percent) are non-infrastructure projects, such in each of the subsequent funding cycles. Similarly,
as educational initiatives to improve bike safety the average total project cost has generally gotten
and funding the state’s active transportation larger with each funding cycle (with the exception
resource center. Lastly, 56 projects (7 percent) are of the second cycle of projects). In cycle three,
4 LEGISLATIVE ANALYST’S OFFICE
analysis full
gutter
AN LAO REPORT
that last complete funding cycle, the average ATP manual counts of students walking and biking and
grant award was $2.5 million for projects with was done in the middle of winter. This approach to
an average project cost of $4.5 million. For the conducting bicyclist and pedestrian counts gives
partially complete fourth funding cycle, the average results that are not comparable. Unsurprisingly, in this
ATP grant award for the statewide and small urban example, the number of students walking and biking
and rural projects is even higher at $4.6 million with actually decreased after the project—likely as a result
an average project cost of $5.7 million. While this of poorer weather, other changes in travel behavior
trend could reflect a general rise in costs, it also since the beginning of the school year, and shifting
likely reflects a modest shift in the types of active from self-reported data to data based on manual
transportation projects applying for and receiving counts. Given the concerns about data quality raised
ATP funding toward larger projects. by Caltrans, and the inconsistencies observed in the
sample project, it is impossible at this time to make
Project Benefits
any meaningful determinations about whether the
Unable to Make Meaningful Conclusions ATP is resulting in increased walking and biking.
About Whether Program Increases Bicycling and Most Projects Benefit Disadvantaged
Walking. In its December 2018 ATP status report, Communities. Of the 776 total projects funded
Caltrans describes receiving 65 complete project thus far, 686 projects (88 percent) had some benefit
completion reports (and 9 incomplete reports)
for projects primarily awarded funding during the Figure 1
first ATP funding cycle. Of the 65 project reports,
Active Transportation Projects and
roughly half reported bicyclist and pedestrian
Funding
counts. For those that did provide counts, the
(Dollars in Millions)
reported changes in biking and walking were mixed,
with some project sponsors reporting a decrease Number of
Funding Cycle Projects Funding
in walking and biking after the completion of the
project, while other projects reporting an increase. Cycle 1
According to Caltrans, there are several factors State 126 $183.6
SUR 22 36.6
likely contributing to the poor quality of the reported
MPO 115 133.7
benefits and outcomes. One concern is that project
Subtotals (263) ($353.9)
completion reports are required to be submitted
Cycle 2
to Caltrans within six months of the project’s
State 87 $179.9
completion, which does not allow enough time
SUR 27 35.5
for travelers to change their behavior to increase
MPO 93 143.4
walking and biking. Another concern with the
Subtotals (207) ($358.8)
reported benefits and outcomes is the use of
Cycle 3
inconsistent counting methodologies. For example,
State 101 $212.8
a sample project completion report provided to
SUR 19 47.9
our office shows before and after bicyclist and MPO 125 348
pedestrian counts being conducted under different Subtotals (245) ($608.7)
methodologies. In the initial bicyclist and pedestrian
Cycle 4
count to establish a baseline before undertaking a State 51 $237.6
project, project sponsors surveyed parents at the SUR 10 43.8
school near the project site on how their student MPOa — —
gets to and from school and how often the student Subtotals (61) ($281.4)
walks or bikes. This survey was conducted in the Totals 776 1,602.8
a
late summer, likely around the start of the school The MPO component of the fourth cycle was not complete at the time
this analysis was written.
year. The follow-up bicyclist and pedestrian count
SUR = small urban and rural and MPO = Metropolitan Planning
conducted after the completion of the project used Organization.
www.lao.ca.gov 5
analysis full
gutter
AN LAO REPORT
to a disadvantaged community. The percentage of Other Goals and Potential Benefits Difficult
projects benefitting a disadvantaged community to Evaluate. Most of the other program goals or
have increased in each funding cycle. For example, potential project benefits are difficult to evaluate,
in the first funding cycle, 84 percent of the especially without accurate data on the change in
projects benefitted a disadvantaged community, walking and biking resulting from the project. For
while 93 percent of projects in the third funding example, while GHG reductions can be estimated
cycle benefitted disadvantaged communities. The using available tools (such as the California Air
percentage of projects benefitting a disadvantaged Resources Board’s GHG emission reduction
community is even higher for the partially calculator), these tools rely on accurate inputs
complete fourth funding cycle with 98 percent of such as accurate counts of the increase in walking
projects having some disadvantaged community and biking resulting from a project. Similarly,
benefits. There are a couple of potential reasons project sponsors and CTC staff reported difficulty
for the upward trend in the number of projects in demonstrating and evaluating the achieved
that benefit a disadvantaged community. First, public health benefits of individual projects. This
each funding cycle CTC updates the project is because such benefits stem from an increase
scoring and selection criteria. The way benefits in walking and biking and additionally are likely
to disadvantaged communities are scored has to materialize over a longer period of time and
changed over time and appears to allow for be impacted by other variables that shape public
more projects to qualify for some disadvantaged health outcomes such as dietary and other exercise
community points than was initially the case. For trends. In addition, it is not possible to determine
example, in the fourth funding cycle, projects can the safety benefits resulting from ATP projects at
earn points based on median household income, this time, because Caltrans’ ATP status report does
the number and free and reduced-priced school not provide information on safety-related outcomes.
lunches for students in the community, the use
Implementation Challenges and
of the California Communities Environmental
Health Screening Tool (commonly referred to as Program Administration
“CalEnviro Screen” which identifies areas that are
Application Scoring Process Requires Many
disproportionately affected by sources of pollution),
Volunteers, Somewhat Duplicative. As discussed
or another definition proposed by a regional agency
earlier, CTC relies on about 100 volunteers working
and approved by the CTC. Second, it is possible
in teams of two to evaluate and score proposed
that project sponsors are changing the types or
projects. Each two-person team will evaluate about
scope of projects proposed when applying for
15 of the total applications. The teams will then
an ATP grant to focus more on disadvantaged
assign a score to each project using the scoring
communities.
criteria approved by the CTC. In addition, CTC staff
No Major Benefits to the State Highway
also evaluate and score each project in order to
System. As discussed earlier, the supplemental
ensure consistency in scoring across the various
report language requires us to identify the potential
teams. If CTC staff have a significant difference in
benefits to the state highway system from ATP
the score on a particular project than the volunteer
projects. Most ATP projects are local projects,
team, CTC staff will talk to the volunteer team
typically associated with local streets and roads.
about the scoring. However, CTC staff never
However, there are some state highways that
require a volunteer team to change the score for
serve as local roads through communities. It is
a project and the final score of the volunteer team
likely that some ATP funded projects are on these
is the project’s official score used to determine
state highways that function more like local roads
whether the project will receive funding through
and would therefore have travelers who walk and
the statewide and small urban and rural project
bike. Data on the number of ATP projects on state
selection processes described above.
highways was not available at the time this report
Relying on volunteers requires enough interested
was prepared.
individuals to agree to volunteer and requires CTC
6 LEGISLATIVE ANALYST’S OFFICE
analysis full
gutter
AN LAO REPORT
staff to do a significant amount of work to also funding. By limiting the pool of eligible projects
evaluate and score projects to ensure scoring in this way, it is possible that certain projects
consistency. Because CTC staff is conducting their that are a high priority from a local or regional
own review and scoring the process appears to be perspective are not eligible to be funded. This is
duplicative. From the information available at the because some project sponsors may be unable or
time of this analysis, it is unclear how the use of unwilling to complete the state’s ATP application.
volunteer teams benefits the overall administration We have heard from some project sponsors that
of the program, since CTC staff are also performing the application process is cumbersome to complete
their own evaluation of each project. and many agencies hire a consultant to develop
MPOs Limited to Pool of Projects That Apply the application on their behalf. Some agencies
for State Funding. The current project application may lack the resources to hire a consultant or
and selection process limits the projects available complete the application process with their own
for selection by MPOs to only those projects staff. Similarly, for some projects, such as low cost
that applied for funding through the statewide projects, it might not make sense to go through a
component of the program, but did not receive costly application process to seek project funding.
RECOMMENDATIONS
As required by the Supplemental Report of the Consider Role of Statewide
2018-19 Budget Act, we make recommendations
Component of the Program
below to improve the effectiveness of the ATP, as
well as address our above findings. While the CTC’s administration of the program
does not raise any major concerns, the projects
Require Collection of receiving funding from the statewide component
Better Data on Program Benefits of the program do not appear to differ significantly
from the types and size of projects receiving
As discussed above, the project completion
funding through the other program components
reports currently required under the program
and are generally small in scale. (Although the
guidelines do not provide accurate data to assess
size of projects being funded is increasing with
certain key project outcomes, such as increases
each funding cycle, which could indicate that
in walking and biking. Without such data it is not
project sponsors are moving toward larger,
possible to determine the overall effectiveness
more transformative projects.) This finding raises
of the program at achieving its goals, such as
questions about whether each component of
increasing bicycling and walking. Accordingly, we
the program is structured in a way to maximize
recommend that the Legislature adopt legislation
the intended benefits from active transportation
requiring CTC and Caltrans to collect more
projects and whether there are benefits to having
accurate project outcome information such as
three different program components if each
accurate bicycling and pedestrian counts and
component is funding the same types of projects
safety-related data. In recognition of the workload
and attempting to meet the same goals.
involved in collecting such in-depth information, the
Because the statewide component of the
Legislature could consider requiring outcome data
program was created to provide the opportunity
only for larger projects where the additional effort
for state-level decision-making on active
of conducting accurate bicycling and pedestrian
transportation priorities and projects, we think this
counts and collecting safety data are likely to show
program component provides a key opportunity
meaningful outcomes.
for the Legislature to consider changes to the
goals, priorities, and types of projects funded.
Accordingly, we recommend that the Legislature
www.lao.ca.gov 7
analysis full
gutter
AN LAO REPORT
consider whether the role of the statewide the Legislature adjust the overall administrative
component of the program should focus on larger, structure of the program to reflect these changes.
more transformative projects, as was envisioned For example, continuing to require all small urban
when the ATP was established. We think such and rural and MPO projects to first apply to the
a focus makes sense because larger, more statewide component of the program would not
transformative projects are difficult to fund at the make sense if the statewide component of the
local level and therefore may only be possible program is changed to focus on different types of
through a state-administered program. projects, such as larger transformative projects.
To the extent that the Legislature wants to focus
Consider Providing
the ATP on larger more, transformative projects, a
More Flexibility to MPOs
better understanding of the challenges of doing so
and the changes necessary to actually implement
If the Legislature changes the statewide
such a focus would be beneficial. In order to better
component of the program, as we suggest
understand why CTC is currently selecting projects
considering, the process for selecting projects
for the statewide component that are similar to the
for the MPOs and small urban and rural regions
projects funded through the other components, the
would need to also change. However, even if
Legislature could have CTC report on reasons why
the Legislature does not change the statewide
project sponsors are often proposing small projects
component of the program, we recommend that the
and whether additional requirements or assistance
Legislature consider providing additional flexibility
provided in the statewide component of the
to the MPOs to select projects they determine are
program could better encourage the selection of
the highest priority for their region. One approach
larger, more transformative projects. For example,
could be to remove the existing requirement that
it is possible that project sponsors are unable to
MPOs choose projects only from the list of projects
put forward larger projects for reasons such as
that previously applied to (and did not receive
limited availability of local or other funds to support
funding from) the statewide component. This
such projects or limited capacity to manage large
could allow MPOs to potentially look at a broader
projects. The CTC could also report on changes
pool of projects while still ensuring all projects are
that would be necessary to change the focus of
part of the state ATP program, including having
the statewide component of the program, such
oversight from CTC and requiring CTC to allocate
as increasing the minimum project size eligible for
funds to specific phases of each project. Another
funding. If the Legislature does not want to require
approach could be to simply grant the funds to
the statewide component of the program to focus
the MPOs, allowing the MPOs to administer the
on larger transformative projects, it may want
funds and require reporting on how funds are
to consider what specific objectives it wants to
spent. Under such an approach, the MPO-selected
achieve with this component of the program.
projects would no longer be subject to project-level
Based on changes to the focus of the statewide oversight by the CTC or to CTC fund allocation for
component of the program, we would recommend each phase of the project.
LAO PUBLICATIONS
This report was prepared by Jessica Peters and reviewed by Anthony Simbol. The Legislative Analyst’s Office (LAO) is
a nonpartisan office that provides fiscal and policy information and advice to the Legislature.
To request publications call (916) 445-4656. This report and others, as well as an e-mail subscription service, are
available on the LAO’s website at www.lao.ca.gov. The LAO is located at 925 L Street, Suite 1000, Sacramento,
CA 95814.
8 LEGISLATIVE ANALYST’S OFFICE