OVSTA
Staff Report: Update Items 1, 3, 4, 5, 6, 8, 10
Hart System 3.4 (Prior Conditional Approval - September 17, 2004)
Read the report at Hart InterCivic ↗
STATUS UPDATE ON AGENDA ITEMS 1, 3, 4, 5, 7, 8 AND 10
Election Systems and Software Model 100, 550 and 650
and Unity; Diebold Election Systems AccuVote-OS and
VCProgrammer; Hart Intercivic eSlate Voting System;
Sequoia Voting Systems AVC Edge and WinEDS;
Avante Optical Vote-Trakker, Datavote Ballot/Card
Readers; Election Systems and Software Optech Eagle,
Optech IV-C and iVotronic
Prepared by:
Secretary of State Elections Division
September 29, 2004
________________________________________________________________________________________________________
STATUS UPDATE ON AGENDA ITEMS 1, 3, 4, 5, 7, 8 AND 10 SEPTEMBER 29, 2004
Table of Contents
I. Summary...................................................................................................................................3
II. Item 1: Election Systems and Software Model 100, 550 and 650 and Unity.........................3
III. Item 3a: Diebold Election Systems AccuVote-OS ................................................................3
IV. Item 3b: Diebold Election Systems VCProgrammer .............................................................4
V. Item 4: Hart Intercivic: eSlate Voting System ..........................................................................4
VI. Item 5: Sequoia Voting Systems AVC Edge and WinEDS .....................................................5
VII. Item 7: Avante Optical Vote-Trakker .....................................................................................5
VIII. Item 8: Datavote Ballot/Card Readers ..................................................................................6
IX. Item 10: Election Systems and Software Optech Eagle, Optech IV-C and iVotronic .............6
________________________________________________________________________________________________________
Status Update on Agenda Items 1, 3, 4, 5, 7, 8 and 10 September 29, 2004
Page 2 of 6
I. SUMMARY
At the September 14, 2004 hearing of the Voting Systems and Procedures Panel (VSPP)
the Chair requested a status update report on items heard at the September 9th and 14th
hearings. Items falling under this update were Election Systems and Software Model
100, 550 and 650 and Unity, Diebold Election Systems AccuVote-OS and
VCProgrammer, Hart Intercivic eSlate Voting System, Sequoia Voting Systems AVC
Edge and WinEDS.
In addition, there are updates on several items scheduled for the October 5 hearing date.
Specifically, there are updates on the Datavote Ballot/Card Readers and Election Systems
and Software Optech Eagle, Optech IV-C and iVotronic.
II. ITEM 1: ELECTION SYSTEMS AND SOFTWARE
MODEL 100, 550 AND 650 AND UNITY
At the September 9th hearing of the VSPP the panel recommended certification of the
Model 100, Model 550 and Model 650, along with the Unity Election Management
Software with several conditions.
Two of these conditions were met prior to the issuance of a certification:
1. Federal qualification evidenced by NASED # N-1-02-21-21-002 was received.
2. Copies of all required federal Independent Testing Authority (ITA) reports were
received.
On September 17, 2004 a certification was issued that included most of the remaining
recommended conditions for certification from the VSPP. The certification did not
include the recommendation that the certification be limited to the November 2004
general election.
Subsequent to the certification, the vendor completed the requirement that updated
procedures be submitted to correct typographical errors. Those updated procedures have
been posted on the Secretary of State’s website.
No further action is currently required to meet the remaining conditions for certification.
III. ITEM 3A: DIEBOLD ELECTION SYSTEMS
ACCUVOTE-OS
At the September 14th hearing of the VSPP the panel recommended certification of the
AccuVote-OS with several conditions.
________________________________________________________________________________________________________
Status Update on Agenda Items 1, 3, 4, 5, 7, 8 and 10 September 29, 2004
Page 3 of 6
Two of these conditions were met prior to the issuance of a certification:
1. Federal qualification evidenced by NASED # N-1-06-12-12-004 was received.
2. Copies of all required federal Independent Testing Authority (ITA) reports were
received.
On September 28, 2004 a certification was issued that included the remaining
recommended conditions for certification from the VSPP.
No further action is currently required to meet the remaining conditions for certification.
IV. ITEM 3B: DIEBOLD ELECTION SYSTEMS
VCPROGRAMMER
At the September 14th hearing of the VSPP the panel recommended certification of
VCProgrammer with several conditions.
Two of these conditions were met prior to the issuance of a certification:
1. Federal qualification evidenced by NASED # N-1-06-12-12-004 was received.
2. Copies of all required federal Independent Testing Authority (ITA) reports were
received.
3. Submission of updated procedures to strengthen security requirements relating to
the use of the program. Those updated procedures have been posted on the
Secretary of State’s website.
Another condition for certification was that any jurisdiction using VCProgrammer submit
and receive approval for a security plan for the use of the program. Plans have been
received for Alameda, Los Angeles and Plumas. These plans are currently under staff
review.
Certification has not yet been issued for this item.
V. ITEM 4: HART INTERCIVIC ESLATE VOTING
SYSTEM
At the September 14th hearing of the VSPP the panel recommended certification of the
eSlate Voting System with several conditions.
On September 17, 2004 a certification was issued that included the recommended
conditions for certification from the VSPP.
________________________________________________________________________________________________________
Status Update on Agenda Items 1, 3, 4, 5, 7, 8 and 10 September 29, 2004
Page 4 of 6
Subsequent to the certification, the vendor completed the requirement that updated
procedures be submitted to require the posting of the tally tape at the polling place.
Those updated procedures have been posted on the Secretary of State’s website.
In addition, on September 21st, Secretary of State staff successfully testing the Kodak
i830 and Fujitsu 4099 optical scanners, meeting that condition for certification.
No further action is currently required to meet the remaining conditions for certification.
VI. ITEM 5: SEQUOIA VOTING SYSTEMS AVC EDGE
AND WINEDS
At the September 14th hearing of the VSPP the panel recommended certification of the
AVC Edge and WinEDS (along with the previously certified Optech 400C) with several
conditions.
Two of these conditions were met prior to the issuance of a certification:
1. Federal qualification evidenced by NASED # N-1-07-12-11-005 was received.
2. Copies of all required federal Independent Testing Authority (ITA) reports were
received.
On September 28, 2004 a certification was issued that included the recommended
conditions for certification from the VSPP.
No further action is currently required to meet the remaining conditions for certification.
VII. ITEM 7: AVANTE OPTICAL VOTE-TRAKKER
At the September 9th hearing of the VSPP, the Chair request that staff contact Avante
about postponing its application until after November as it was not needed for the
upcoming election. After contacting the vendor, Avante also indicated it desired to delay
the hearing.
Therefore, staff recommends continuing this item forward until the first hearing of the
VSPP following the November 2, 2004 General Election.
VIII. ITEM 9: DATAVOTE BALLOT/CARD READERS
________________________________________________________________________________________________________
Status Update on Agenda Items 1, 3, 4, 5, 7, 8 and 10 September 29, 2004
Page 5 of 6
At the time of the issuance of the notice for the October 5 VSPP hearing, Secretary of
State staff was unable to verify the certification of the Datavote ballot/card readers used
in two counties: Alpine and Yuba.
On September 22 Secretary of State staff inspected the ballot/card readers in those two
counties. Using the additional information gathered during those inspections, staff was
able to verify the certification of the ballot/card readers used in those counties.
Therefore, there is no application pending before the panel on this item and no action is
required.
IX. ITEM 10: ELECTION SYSTEMS AND SOFTWARE
OPTECH EAGLE, OPTECH IV-C AND IVOTRONIC
Testing has not yet been completed for the Optech Eagle, Optech IV-C and/or iVotronic.
Staff recommends continuing this item forward to the October 22nd hearing date.
________________________________________________________________________________________________________
Status Update on Agenda Items 1, 3, 4, 5, 7, 8 and 10 September 29, 2004
Page 6 of 6